Sample records for implementation work plan

  1. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  2. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  3. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  4. Making Strategic Planning Work: Experiences from a Private University. AIR 1986 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Chan, Susy S.

    Issues in implementating strategic planning in higher education management are considered, along with successful strategies and problem areas in implementing an integrated planning and budgeting process at DePaul University, a comprehensive Catholic university. Key implementation issues are as follows: (1) maintaining an organizational balance…

  5. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  6. 40 CFR 256.05 - Annual work program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...

  7. 40 CFR 256.05 - Annual work program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...

  8. 40 CFR 256.05 - Annual work program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 256.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Purpose, General Requirements... implementation of the State plan. ...

  9. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  10. The Portfolio Project: A Study of Assessment, Instruction, and Middle School Reform.

    ERIC Educational Resources Information Center

    Underwood, Terry

    This book is a study, in research-based narrative form, of one middle school's implementation of a new portfolio assessment plan in response to statewide policy changes in California. The book highlights the interactions of state, district, and local forces as teachers work to implement a portfolio-assessment plan that collects student work and…

  11. 40 CFR 52.2352 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) rule R307-1-8, Asbestos Work Practices, Contractor Certification, AHERA Accreditation and AHERA Implementation, is removed from Utah's approved State Implementation Plan (SIP). This rule language pertains to... plan. (a) Utah Air Conservation Regulation R307-18-1, New Source Performance Standards, is removed from...

  12. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  13. The Relationship between Working Memory Capacity and L2 Oral Performance under Task-Based Careful Online Planning Condition

    ERIC Educational Resources Information Center

    Ahmadian, Mohammad Javad

    2012-01-01

    The study reported in this article aimed to investigate the way working memory capacity (WMC) interacts with careful online planning--a task-based implementation variable--to affect second language (L2) speech production. This issue is important to teachers, because it delves into one of the possible task-based implementation variables and thus…

  14. Tank waste remediation system configuration management plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less

  15. Implementing Earned Value Management in the CxP EVA Systems Project Office

    NASA Technical Reports Server (NTRS)

    Sorge, Les L.

    2009-01-01

    Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

  16. Knowledge co-production and boundary work to promote implementation of conservation plans.

    PubMed

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas for rivers and wetlands and have been applied in 25 of the 37 use contexts since their launch just over 3 years ago. When framed as a knowledge co-production process supported by boundary work, regional conservation plans can be developed into valuable boundary objects that offer a tangible tool for multi-agency cooperation around conservation. Our work provides practical guidance for promoting uptake of conservation science and contributes to an evidence base on how conservation efforts can be improved. © 2015 Society for Conservation Biology.

  17. Implementing an Interdisciplinary Student Centric Approach to Work-Integrated Learning

    ERIC Educational Resources Information Center

    Marchioro, Gary; Ryan, Maria M.; Perkins, Tim

    2014-01-01

    This paper describes the implementation of an innovative approach to work-integrated learning using interdisciplinary projects within a university Faculty of Business. Further, it discusses the implementation of integrated and authentic assessments involving academic units in the marketing, urban planning and business communication disciplines.…

  18. Creating a High-Touch Recruitment Event: Utilizing Faculty to Recruit and Yield Students

    ERIC Educational Resources Information Center

    Freed, Lindsey R.; Howell, Leanne L.

    2018-01-01

    The following article describes the planning and implementation of a university student recruitment event that produced a high (new) student yield. Detailed descriptions of how staff and faculty worked together to plan and implement this event are described.

  19. Work Zone Design and Operations Enhancements

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  20. Work-team implementation.

    PubMed

    Reiste, K K; Hubrich, A

    1996-02-01

    The authors describe the implementation of the Work-Team Concept at the Frigidaire plans in Jefferson, Iowa. By forming teams, plant staff have made significant improvements in worker safety, product quality, customer service, cost-effectiveness, and overall employee well-being.

  1. Work zone and operation enhancements.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  2. Effects of a workplace travel plan intervention encouraging active travel to work: outcomes from a three-year time-series study.

    PubMed

    Petrunoff, N; Wen, L M; Rissel, C

    2016-06-01

    To evaluate the effects of a three-year workplace travel plan intervention on increasing active travel to work. A time-series study with staff was conducted in 2011 (n = 804), 2012 (n = 904), 2013 (n = 872) and 2014 (n = 687). A travel plan was implemented at a large, outer-suburban worksite in Sydney, Australia. Implementation was assessed by reviewing annual reports including travel plan actions and their status. Annual cross-sectional on-line surveys assessed primary outcomes which included change in the proportion of staff travelling to work via active modes. Multivariate logistic regression was used to adjust for confounders. Strategies to encourage active travel were partially implemented. An average survey response rate was 23% (n = 817). The proportion of staff travelling actively to work increased by 4%-6% across intervention years compared to the baseline, and this increase was significant in 2012 (P = 0.04) and 2013 (P = 0.003). Compared to baseline, after adjusting for distances staff lived from work staff had 33% (95% CI 1%-74%) greater odds of travelling to work via active modes in 2012, and 50% (95% CI 15%-96%) greater odds in 2013. There was no evidence of change in physical activity levels. A workplace travel plan which only included strategies to encourage active travel to work achieved small but significant increases in active travel. Workplace travel plans appear to be a promising way to increase active travel to work. Copyright © 2016 The Royal Society for Public Health. All rights reserved.

  3. Interim OECA Guidance on Enhancing Regional-State Planning and Communication on Compliance Assurance Work in Authorized States

    EPA Pesticide Factsheets

    Guidance outlining principles and best practices for State and EPA collaboration in inspections and enforcement. work planning and implementation. National Enforcement Initiatives, and outcome and performance measurement.

  4. Psychotherapeutic and vocational interventions among young adults with work disability due to mental disorders in Finland.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Kivekäs, Teija; Kivimäki, Mika; Koskinen, Aki; Virtanen, Marianna

    2018-05-01

    Backround: Little is known about treatment and rehabilitation received and planned among young adults with work disability due to a mental disorder. To examine the implemented psychotherapeutic and vocational interventions and treatment plans among young adults with work disability due to a mental disorder. Data were collected from medical records of young Finnish adults aged 18-34 with a long-term work disability history due to a mental disorder (N = 1163). The participant characteristics associated with four types of interventions were analyzed using log-binomial regression analysis. In total, 34% had participated in a psychotherapeutic intervention. Of the non-students, 26% had participated in vocational intervention. For 46% of the non-students, neither type of intervention was planned. Both implemented and planned psychotherapeutic interventions were associated with female sex, high education, attachment to employment, and absence of substance abuse. Low education and childhood adversity were associated with implemented vocational interventions and absence of substance abuse with planned vocational interventions. There is an unmet need for psychotherapeutic interventions among men, among those with lower socio-economic status, and among those with poor attachment to labor market. In addition, there is a lack of vocational interventions for those with high education. People with substance abuse are largely excluded from both types of interventions.

  5. Work and Family: How Managers Can Make a Difference.

    ERIC Educational Resources Information Center

    Collins, Ray; Magid, Renee Y.

    1990-01-01

    The work-family audit is a framework for employer planning of work-family policies and programs. The audit identifies key aspects of the labor force and community. Steps are identifying options, specifying objectives, planning for implementation, stating outcomes and benefits, and preparing to measure costs and benefits. (SK)

  6. The IAU Division A Working Group on the Third Realization of the ICRF: Background, Goals, Plans

    NASA Astrophysics Data System (ADS)

    Gaume, Ralph

    2015-08-01

    The XXVIII General Assembly of the IAU (Beijing, 2012) established the Division A Working Group on the Third Realization of the International Celestial Reference Frame (ICRF). The adopted charter of the ICRF3 Working Group includes a commitment to report on the implementation and execution plans for ICRF3 during the XXIX General Assembly of the IAU along with a targeted completion and presentation of ICRF3 in 2018 to the XXX General Assembly for adoption. This talk will discuss the background, purpose, and overall implementation plan for ICRF3, and motivate the concept, currently under consideration by the ICRF3 Working Group, that future realizations of the ICRF be based on multi-frequency astrometric data, starting with ICRF3.

  7. Nebraska Work Based Learning Manual. Planning and Implementation Guides for Educators, Employers, Policymakers, and Parents.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    This manual contains a series of 10 detailed guides for school practitioners who are beginning to create work-based learning programs at their schools. Work-Based Learning Overview defines the different elements of work-based learning and describes the roles of program participants. Program Planning Guide offers suggestions about how to plan…

  8. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  9. Hood River and Pelton Ladder Evaluation Studies : Annual Report 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, Erik A.; French, Rod A.; Ritchey, Alan D.

    1995-09-01

    In 1992, the Northwest Power Planning Council approved the Hood River and Pelton ladder master plans within the framework of the Columbia River Basin Fish and Wildlife Program. The master plans define an approach for implementing a hatchery supplementation program in the Hood River subbasin. The hatchery program as defined in the master plans is called the Hood River Hatchery Production Program (HRPP). The HRPP will be phased in over several years and will be jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and the Confederated Tribes of the Warm Springs (CTWS) Reservation. In December 1991, amore » monitoring and evaluation program was implemented in the Hood River subbasin to collect life history and production information on stocks of anadromous salmonids returning to the Hood River subbasin. The program was implemented to provide the baseline information needed to: (1) evaluate various management options for implementing the HRPP and (2) determine any post-project impacts the HRPP has on indigenous populations of resident fish. Information collected during the 1992-94 fiscal years will also be used to prepare an environmental impact statement (EIS) evaluating the program`s impact on the human environment. To begin construction on project facilities, it was proposed that the HRPP be implemented in two phases. Phase I would include work that would fall under a {open_quotes}categorical exclusion{close_quotes} from NEPA, and Phase II would include work requiring an EIS prior to implementation. This report summarizes the life history and escapement data collected in the Hood River subbasin and the status work of implemented under Phase I of the HR Life history and escapement data will be used to: (1) test the assumptions on which harvest and escapement goals for the Hood River and Pelton ladder master plans are based and (2) develop biologically based management recommendations for implementing the HRPP.« less

  10. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  11. "If You Don't Do Parking Management .. Forget Your Behaviour Change, It's Not Going to Work.": Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion.

    PubMed

    Petrunoff, Nick; Rissel, Chris; Wen, Li Ming

    2017-01-01

    After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners' perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required.

  12. “If You Don’t Do Parking Management .. Forget Your Behaviour Change, It’s Not Going to Work.”: Health and Transport Practitioner Perspectives on Workplace Active Travel Promotion

    PubMed Central

    Rissel, Chris; Wen, Li Ming

    2017-01-01

    Objectives After having conducted two studies of the effectiveness of workplace travel plans for promoting active travel, we investigated health and transport practitioners’ perspectives on implementing workplace travel plans to share some of the lessons learnt. The objectives of this study were to describe perceived elements of effective workplace travel plans, barriers and enablers to workplace travel planning, their experiences of working with the other profession on travel plan implementation, their recommendations for workplace travel planning, and also to explore similarities and differences in transport and health practitioner perspectives. Materials and Methods Fourteen health and ten transport practitioners who had prior involvement in workplace travel plan programs were purposefully selected from workplaces in Australia. We conducted 20 in-depth interviews since data saturation had been reached at this point, and data were subject to framework analysis. Results Perceived essential elements of effective workplace travel plans included parking management; leadership, organisational commitment and governance; skills and other resources like a dedicated travel plan coordinator; and, pre-conditions including supportive transport infrastructure in the surrounds. Recommendations for promoting travel plans included supportive government policy, focusing on business benefits and working at different scales of implementation (e.g. single large worksites and business precincts). Health and transport practitioner perspectives differed, with transport practitioners believing that parking management is the key action for managing travel demand at a worksite. Conclusions Health practitioners implementing travel plans may require training including concepts of travel demand management, and support from transport planners on parking management strategies. Promoting an understanding of the shared travel behaviour change skills of transport and health practitioners may assist further collaboration. For take-up by organisations to be of sufficient scale to create meaningful population level reductions in driving and increases in active travel, promotion and travel plans should be focused on the priorities of the organisations. Supportive government policy is also required. PMID:28135301

  13. 18 CFR 708.4 - Required programs and reports.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... part of the Master Plan—Plan of Study. The work plan shall satisfy minimum standards described in this... related to implementation of the Master Plan. These recommendations shall be based on evaluation of...

  14. SAN JUAN BAY ESTUARY PROGRAM COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN IMPLEMENTATION TRACKING REPORT, 2004

    EPA Science Inventory

    Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...

  15. Washington State Guide to Planning, Implementing and Improving Work-based Learning. A Guide for Educators at All Levels.

    ERIC Educational Resources Information Center

    Highline Community Coll., Des Moines, WA.

    This guide, which is intended primarily for school and college personnel interested in initiating or improving work-based learning, examines the development and implementation of work-based education programs in Washington. The following topics are discussed: the rationale for work-based learning (legislative and educational change information,…

  16. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    NASA Astrophysics Data System (ADS)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  17. 75 FR 52701 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... information claimed to be Confidential Business Information (CBI) or other information whose disclosure is.... Ventilation Limits 5. Ongoing Ventilation Testing and Reporting Requirements 6. Winter Construction Work..., including building enclosure and ventilation projects, implementation of work practice standards, process...

  18. Multi-Modal Traveler Information System - Gateway Phased Implementation Plan

    DOT National Transportation Integrated Search

    1997-11-25

    The purpose of this working paper is to provide the main concepts and elements that need to be addressed in the overall implementation of the Gateway, both the Initial Phase and the Ultimate Phase. This working paper addresses these concepts and elem...

  19. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  20. STEM Teachers' Planned and Enacted Attempts at Implementing Engineering Design-Based Instruction

    ERIC Educational Resources Information Center

    Capobianco, Brenda M.; Rupp, Madeline

    2014-01-01

    This study investigates grades 5 and 6 science, technology, engineering, and mathematics (STEM) teachers' planned and actualized engineering design-based instruction, the instruments used to characterize their efforts, and the implications this work has for teachers' implementations of an integrated approach to STEM education.…

  1. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... RATA a minimum of 25 working days prior to actual testing. (C) Beginning on May 21, 2008, ExxonMobil...

  2. Work Planning and Control - Activity-Based Work Authorization

    Science.gov Websites

    Good Activity Description Training & Resources WPC Feedback or Help Request DOE and UC Seals DOE UC Home Training FAQ Contact Home Welcome! The purpose of this site is to keep everyone at LBNL connected in the(Training section). Work Planning and Control (WPC) is a program focused on implementing

  3. 20 CFR 411.715 - If an alternate participant becomes an EN, will beneficiaries for whom an employment plan was...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., will beneficiaries for whom an employment plan was signed prior to implementation be covered under the Ticket to Work program payment provisions? 411.715 Section 411.715 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate...

  4. 20 CFR 411.730 - What happens if an alternate participant signed an employment plan with a beneficiary before...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... signed an employment plan with a beneficiary before Ticket to Work program implementation in the State... Section 411.730 Employees' Benefits SOCIAL SECURITY ADMINISTRATION THE TICKET TO WORK AND SELF-SUFFICIENCY PROGRAM The Ticket to Work Program and Alternate Participants Under the Programs For Payments For...

  5. Enhancing Job Performance

    ERIC Educational Resources Information Center

    Devlin, Patricia

    2011-01-01

    The impact of the Self-Determined Career Development Model (hereafter called the Self-Determined Career Model) on the job performance of four adults with moderate intellectual disability employed in competitive work settings was examined. Employees learned to set work-related goals, develop an action plan, implement the plan, and adjust their…

  6. Healthcare Managers' Experiences of Leading the Implementation of Video Conferencing in Discharge Planning Sessions: An Interview Study.

    PubMed

    Hofflander, Malin; Nilsson, Lina; Eriksén, Sara; Borg, Christel

    2016-03-01

    This article describes healthcare managers' experiences of leading the implementation of video conferencing in discharge planning sessions as a new tool in everyday practice. Data collection took place through individual interviews and the interviews were analyzed using qualitative content analysis with an inductive approach. The results indicate that managers identified two distinct leadership perspectives when they reflected on the implementation process. They described a desired way of leading the implementation and communicating about the upcoming change, understanding and securing support for decisions, as well as ensuring that sufficient time is available throughout the change process. They also, however, described how they perceived that the implementation process was actually taking place, highlighting the lack of planning and preparation as well as the need for support and to be supportive, and having the courage to adopt and lead the implementation. It is suggested that managers at all levels require more information and training in how to encourage staff to become involved in designing their everyday work and in the implementation process. Managers, too, need ongoing organizational support for good leadership throughout the implementation of video conferencing in discharge planning sessions, including planning, start-up, implementation, and evaluation.

  7. Restoration Planning | NOAA Gulf Spill Restoration

    Science.gov Websites

    Mexico. Since then, we have worked with the public and BP to identify and implement early restoration restoration plan for the Gulf of Mexico and took public comments on the draft plan through December 4, 2015

  8. Planning for the Global Earth Observation System of Systems (GEOSS)

    USGS Publications Warehouse

    Christian, E.

    2005-01-01

    The Group on Earth Observations was established to promote comprehensive, coordinated, and sustained Earth observations. Its mandate is to implement the Global Earth Observation System of Systems (GEOSS) in accord with the GEOSS 10-Year Implementation Plan and Reference Document. During the months over which the GEOSS Implementation Plan was developed, many issues surfaced and were addressed. This article discusses several of the more interesting or challenging of those issues-e.g. fitting in with existing organizations and securing stable funding - some of which have yet to be resolved fully as of this writing. Despite the relatively short period over which the Implementation Plan had to be developed, there is a good chance that the work undertaken will be influential for decades to come. ?? 2005 Elsevier Ltd. All rights reserved.

  9. Planning Guide for Implementing a Quality Youth Apprenticeship Program in Georgia.

    ERIC Educational Resources Information Center

    Smith, Clifton L.

    This planning guide begins with an overview of school-to-work transition. Section 1 also provides an overview of federal and Georgia state legislation and describes current school-to-work transition efforts, such as tech prep education, youth apprenticeship, cooperative education, entrepreneurial ventures and school-based enterprises,…

  10. Public Policy Affirmations Affecting the Planning and Implementation of Developmental Services for Children and Adults with HIV Infection.

    ERIC Educational Resources Information Center

    Crocker, Allen C., Comp.; And Others

    The increasing number of individuals infected with symptomatic human immunodeficiency virus (HIV) infection has created a need to examine public policy issues and to further efforts in planning, implementing, and evaluating services for individuals with HIV infection and their families. A working conference was convened, which identified several…

  11. Implementation plan for HANDI 2000 TWRS master equipment list

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products.

  12. Holding a Sustainability Bearing through Cutty-Grass and Clearings: Implementing Sustainability during Disruptive Organisational Changes

    ERIC Educational Resources Information Center

    North, Chris; Jansen, Chris

    2013-01-01

    This article explores our experiences as faculty implementing a five year sustainability strategic plan within the Outdoor and Environmental Education (OEE) curriculum centre during a time of organisational restructuring. This paper builds on the work of Jansen and Boardman (2011) who describe the process of developing the strategic plan and some…

  13. 40 CFR 35.268 - Award limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for each category; and (5) Significant watershed projects. For watershed projects whose costs exceed $50,000, the work plan also contains: (i) A brief synopsis of the watershed implementation plan...

  14. 40 CFR 35.268 - Award limitations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for each category; and (5) Significant watershed projects. For watershed projects whose costs exceed $50,000, the work plan also contains: (i) A brief synopsis of the watershed implementation plan...

  15. 40 CFR 35.268 - Award limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for each category; and (5) Significant watershed projects. For watershed projects whose costs exceed $50,000, the work plan also contains: (i) A brief synopsis of the watershed implementation plan...

  16. 40 CFR 35.268 - Award limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for each category; and (5) Significant watershed projects. For watershed projects whose costs exceed $50,000, the work plan also contains: (i) A brief synopsis of the watershed implementation plan...

  17. 40 CFR 35.268 - Award limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for each category; and (5) Significant watershed projects. For watershed projects whose costs exceed $50,000, the work plan also contains: (i) A brief synopsis of the watershed implementation plan...

  18. Improving productivity levels: family planning services for factory workers.

    PubMed

    Darmokusumo, H V

    1989-10-01

    In May 1984, the Minister of Manpower in Indonesia, the Chairman of the BKKBN, and representatives of the employers' and workers' organizations of Indonesia issued a joint decree pledging that they would work together to enhance the implementation of the family planning program among workers in the organized sector. 1 objective of the decree is to improve workers' productivity and the standard of living of workers and their families by implementing a family planning program. 1 baseline survey and a clinic-based survey in 5 provinces revealed that 90% of women workers are between 21-40, or are of reproductive age, and are sexually active. Only about 50% are practicing family planning; the other 50% are afraid to practice family planning due to potential side effects of various methods. This fear was most often caused by negative rumors spread by unsatisfied family planning clients. Placing materials for family planning promotion such as instructional posters and video programs advertising contraceptive services in the work setting may increase knowledge and help alleviate some of this fear. Other studies of family planning services show that employees prefer female medical doctors or midwives as service providers, employees are willing to pay for services (but can only afford a small fee), and family planning service points should be near employees' work sites.

  19. EPA Brownfields Area-Wide Planning Recipients Selected for FY13 Grant Funding

    EPA Pesticide Factsheets

    EPA has selected the following entities as Brownfields Area-Wide Planning grant recipients. These recipients will work with their local community members, other stakeholders and project partners to develop an area-wide plan and implementation strategy for

  20. Implementing Problem-Solving Techniques in an Urban Central Office Department by Establishing Teams and Infusing TQM Concepts.

    ERIC Educational Resources Information Center

    Smith, Jewell R.

    This practicum is designed to assist central office personnel in evaluating the work environment for better coordination to accomplish work, plan for a change effort, and implement a participatory change initiative. The work setting involved a K-12 urban school district (193 schools) containing 431 central-office administrators and more than…

  1. Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GRYGIEL, M.L.

    1998-10-08

    Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less

  2. 76 FR 53941 - Notice of Lodging of a Consent Decree Under the Clean Water Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... an SSO elimination plan to eliminate its SSOs. Once EPA and Ohio EPA approve the plans, Euclid will be required to implement the plans. The SSO work must be completed no later than December 31, 2020...

  3. A Library Planning Model--Some Theory and How It Works.

    ERIC Educational Resources Information Center

    Goldberg, Robert L.

    1985-01-01

    The first part of the article describes the theoretical background of a library planning model based on the concept of right brain/left brain activities. The second describes the implementation of a short term planning model based on this theory. (CLB)

  4. Plan of Work for Rural Development in North Carolina, July 1, 1975 - June 30, 1976.

    ERIC Educational Resources Information Center

    Hyatt, George, Jr.; And Others

    Serving primarily as a policy group for local Rural Development Panels, the North Carolina Rural Development Committee's major objective for 1976 is to work with local leaders, private businesses and governmental agencies at all levels in planning and implementing comprehensive rural development programs. Specifically, the Committee's objectives…

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less

  6. Asbestos Model Accreditation Plan (MAP) Enforcement Response Policy

    EPA Pesticide Factsheets

    The Asbestos Model Accreditation Plan (MAP) (40 CFR 763 Subpart E Appendix C) mandates safety training for those who do asbestos removal work, and implements the additional training requirements mandated by Congress

  7. Sample transportation management plans and templates.

    DOT National Transportation Integrated Search

    2010-08-01

    This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  9. Eastern Washington Intermodal Transportation Study Scope of Work

    DOT National Transportation Integrated Search

    1993-02-04

    This document presents a detailed Scope of Work to guide implementation of : the Eastern Washington Intermodal Transportation Study. Included is a : description of project management and staff responsibilities, a detailed work : plan and timetable fo...

  10. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  11. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  12. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  13. 40 CFR 35.917-6 - Acceptance by implementing governmental units.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.917-6 Acceptance by implementing governmental units. A facilities plan submitted for...

  14. Water safety plans: bridges and barriers to implementation in North Carolina.

    PubMed

    Amjad, Urooj Quezon; Luh, Jeanne; Baum, Rachel; Bartram, Jamie

    2016-10-01

    First developed by the World Health Organization, and now used in several countries, water safety plans (WSPs) are a multi-step, preventive process for managing drinking water hazards. While the beneficial impacts of WSPs have been documented in diverse countries, how to successfully implement WSPs in the United States remains a challenge. We examine the willingness and ability of water utility leaders to implement WSPs in the US state of North Carolina. Our findings show that water utilities have more of a reactive than preventive organizational culture, that implementation requires prioritization of time and resources, perceived comparative advantage to other hazard management plans, leadership in implementation, and identification of how WSPs can be embedded in existing work practices. Future research could focus on whether WSP implementation provides benefits such as decreases in operational costs, and improved organization of records and communication.

  15. Mars 2001 Lander Mission: Measurement Synergy through Coordinated Operations Planning and Implementation

    NASA Astrophysics Data System (ADS)

    Arvidson, R.; Bell, J. F., III; Kaplan, D.; Marshall, J.; Mishkin, A.; Saunders, S.; Smith, P.; Squyres, S.

    1999-03-01

    The Science Operations Working Group, Mars 2001 Mission, has developed coordinated plans for scientific observations that treat the instruments as an integrated payload. This approach ensures maximum return of scientific information.

  16. Westinghouse corporate development of a decision software program for Radiological Evaluation Decision Input (REDI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, T.S.

    1995-03-01

    In December 1992, the Department of Energy (DOE) implemented the DOE Radiological Control Manual (RCM). Westinghouse Idaho Nuclear Company, Inc. (WINCO) submitted an implementation plan showing how compliance with the manual would be achieved. This implementation plan was approved by DOE in November 1992. Although WINCO had already been working under a similar Westinghouse RCM, the DOE RCM brought some new and challenging requirements. One such requirement was that of having procedure writers and job planners create the radiological input in work control procedures. Until this time, that information was being provided by radiological engineering or a radiation safety representative.more » As a result of this requirement, Westinghouse developed the Radiological Evaluation Decision Input (REDI) program.« less

  17. The importance of employee participation and perceptions of changes in procedures in a teamworking intervention

    PubMed Central

    Nielsen, Karina; Randall, Raymond

    2012-01-01

    The powerful positive results of implementing teamwork are not always achieved. It has been suggested that attempts to implement theories regarding teamwork do not always lead to those theories being put into practice, and as a result positive outcomes are not always found. The participation of employees in the development and implementation of an intervention may help to ensure that changes take place. In this longitudinal study (N = 583) of teamwork implementation in Denmark we examined the links between pre-intervention working conditions and well-being, levels of participation in planning and implementation, employees’ reports of changes in procedures, and intervention outcomes. Pre-intervention levels of autonomy and job satisfaction predicted the degree of employee participation in the planning and implementation of the intervention. Pre-intervention well-being and social support were linked directly to the degree to which employees reported changes in existing work practices concerning teamwork. In addition, participation and changes in work procedures were significantly associated with post-intervention autonomy, social support and well-being. The results indicate that employee participation in intervention processes is crucial in what appears to be an important association with perceived changes in procedures and, therefore, in intervention outcomes. PMID:22745519

  18. Using planned adaptation to implement evidence-based programs with new populations.

    PubMed

    Lee, Shawna J; Altschul, Inna; Mowbray, Carol T

    2008-06-01

    The Interactive Systems Framework (ISF) for Dissemination and Implementation (Wandersman et al. 2008) elaborates the functions and structures that move evidence-based programs (EBPs) from research to practice. Inherent in that process is the tension between implementing programs with fidelity and the need to tailor programs to fit the target population. We propose Planned Adaptation as one approach to resolve this tension, with the goal of guiding practitioners in adapting EBPs so that they maintain core components of program theory while taking into account the needs of particular populations. Planned Adaptation is a form of capacity building within the Prevention Support System that provides a framework to guide practitioners in adapting programs while encouraging researchers to provide information relevant to adaptation as a critical aspect of dissemination research, with the goal of promoting wider dissemination and better implementation of EBPs. We illustrate Planned Adaptation using the JOBS Program (Caplan et al. 1989), which was developed for recently laid-off, working- and middle-class workers and subsequently implemented with welfare recipients.

  19. The Technical Work Plan Tracking Tool

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Leighton, Adele; Weller, Richard A.; Woodfill, Jared; Parkman, William E.; Ellis, Glenn L.; Wilson, Marilyn M.

    2003-01-01

    The Technical Work Plan Tracking Tool is a web-based application that enables interactive communication and approval of contract requirements that pertain to the administration of the Science, Engineering, Analysis, and Test (SEAT) contract at Johnson Space Center. The implementation of the application has (1) shortened the Technical Work Plan approval process, (2) facilitated writing and documenting requirements in a performance-based environment with associated surveillance plans, (3) simplified the contractor s estimate of the cost for the required work, and (4) allowed for the contractor to document how they plan to accomplish the work. The application is accessible to over 300 designated NASA and contractor employees via two Web sites. For each employee, the application regulates access according to the employee s authority to enter, view, and/or print out diverse information, including reports, work plans, purchase orders, and financial data. Advanced features of this application include on-line approval capability, automatic e-mail notifications requesting review by subsequent approvers, and security inside and outside the firewall.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Pollution Prevention (P2) has evolved into one of DOE`s sprime strategies to meet environmental, fiscal, and worker safety obligations. P2 program planning, opportunity identification, and implementation tools were developed under the direction of the Waste Minimization Division (EM-334). Forty experts from EM, DP, ER and DOE subcontractors attended this 2-day workshop to formulate the incentives to drive utilization of these tools. Plenary and small working group sessions were held both days. Working Group 1 identified incentives to overcoming barriers in the area of P2 program planning and resource allocation. Working Group 2 identified mechanisms to drive the completion of P2more » assessments and generation of opportunities. Working Group 3 compiled and documented a broad range of potential P2 incentives that address fundamental barriers to implementation of cost effective opportunities.« less

  1. Village family planning volunteers in Indonesia: their role in the family planning programme.

    PubMed

    Utomo, Iwu Dwisetyani; Arsyad, Syahmida S; Hasmi, Eddy Nurul

    2006-05-01

    Family planning was once a sensitive issue in Indonesia, but today it is considered essential. This paper reports on a study in 1997-98 of the role of village family planning volunteers and the cadres who worked under them in West Java, Central Java and DI Yogyakarta, in implementing the national family planning programme in Indonesia. A total of 108 village family planning volunteers, 108 family planning cadres, 108 local leaders and 324 couples eligible for family planning from 36 villages in the three provinces were interviewed. The volunteers and cadres have made a significant contribution to the implementation of the family planning programme. They promote family planning, organise meetings, provide information, organise income-generation activities, give savings and credit assistance, collect and report data and deliver other family welfare services. Teachers, wives of government officials and others recognised by the community as better off in terms of education and living conditions were most often identified to become family planning volunteers. Because they are women and because they are the most distant arm of the programme, their work is taken for granted. As their activities are directed towards women, especially in women's traditional roles, the programme tends to entrench the existing gender gap in responsibility for family planning and family welfare.

  2. Dose as a Tool for Planning and Implementing Community-Based Health Strategies.

    PubMed

    Kuo, Elena S; Harner, Lisa T; Frost, Madeline C; Cheadle, Allen; Schwartz, Pamela M

    2018-05-01

    A major challenge in community-based health promotion is implementing strategies that could realistically improve health at the population level. Population dose methodology was developed to help understand the combined impact of multiple strategies on population-level health behaviors. This paper describes one potential use of dose: as a tool for working collaboratively with communities to increase impact when planning and implementing community-level initiatives. Findings are presented from interviews conducted with 11 coordinators who used dose for planning and implementing local efforts with community coalitions. During early-stage planning, dose was used as a tool for strategic planning, and as a framework to build consensus among coalition partners. During implementation, a dose lens was used to revise strategies to increase their reach (the number of people exposed to the intervention) or strength (the relative change in behavior for each exposed person) to create population-level impact. A case study is presented, illustrating how some community coalitions and evaluators currently integrate dose into the planning and implementation of place-based healthy eating and active living strategies. Finally, a planning checklist was developed for program coordinators and evaluators. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  3. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less

  4. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less

  5. The International Space Life Sciences Strategic Planning Working Group

    NASA Technical Reports Server (NTRS)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  6. Implementing post-trial access plans for HIV prevention research.

    PubMed

    Paul, Amy; Merritt, Maria W; Sugarman, Jeremy

    2018-05-01

    Ethics guidance increasingly recognises that researchers and sponsors have obligations to consider provisions for post-trial access (PTA) to interventions that are found to be beneficial in research. Yet, there is little information regarding whether and how such plans can actually be implemented. Understanding practical experiences of developing and implementing these plans is critical to both optimising their implementation and informing conceptual work related to PTA. This viewpoint is informed by experiences with developing and implementing PTA plans for six large-scale multicentre HIV prevention trials supported by the HIV Prevention Trials Network. These experiences suggest that planning and implementing PTA often involve challenges of planning under uncertainty and confronting practical barriers to accessing healthcare systems. Even in relatively favourable circumstances where a tested intervention medication is approved and available in the local healthcare system, system-level barriers can threaten the viability of PTA plans. The aggregate experience across these HIV prevention trials suggests that simply referring participants to local healthcare systems for PTA will not necessarily result in continued access to beneficial interventions for trial participants. Serious commitments to PTA will require additional efforts to learn from future approaches, measuring the success of PTA plans with dedicated follow-up and further developing normative guidance to help research stakeholders navigate the complex practical challenges of realising PTA. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  7. Building a vision for the future: strategic planning in a shared governance nursing organization.

    PubMed

    Baker, C; Beglinger, J E; Bowles, K; Brandt, C; Brennan, K M; Engelbaugh, S; Hallock, T; LaHam, M

    2000-06-01

    Today's health care delivery environment is marked by extreme turbulence and ever-increasing complexity. Now, more than ever, an organization's strategic plan must do more than outline a business plan. Rather, the strategic plan is a fundamental tool for building and sustaining an organizational vision for the future. The strong, dynamic strategic plan (1) represents a long-range vision for improving organizational performance, (2) provides a model for planning and implementing structures and processes for the management of outcomes, (3) reflects and shapes the organizational culture and customer focus, (4) provides decision support for difficult operational choices made day to day, and (5) integrates and aligns the work of the organization. This article describes the development, implementation, and evaluation of a methodology for strategic planning within a shared governance nursing organization. Built upon the strategic plan of the hospital, the process undertaken by the nursing organization reflects the following commitments: (1) to develop a strategic plan that is meaningful and part of daily work life at all levels of the nursing organization, (2) to make the plan practical and realistic through incremental building, (3) to locate and articulate accountability for each step, and (4) to build in a process for checking progress toward goal achievement and readjusting the plan as necessary.

  8. Student Support that Works: A Solid Approach.

    ERIC Educational Resources Information Center

    Lang, Kathy J.; Bielejeski, Ruth

    The College of Saint Benedict and Saint John's University (Minnesota), two coordinate, liberal arts colleges, have implemented a cost-effective student information technology (IT) support system. Project IMPACT (Implementing Academic Technology), a 5-year, $10 million plan to upgrade the technology for student and faculty use, was implemented in…

  9. Field Implementation Plan for the In-Situ Bioremediation Treatability Study at the Technical Area-V Groundwater Area of Concern

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Jun

    This Field Implementation Plan (FIP) was prepared by Sandia National Laboratories, New Mexico (SNL/NM) and provides instruction on conducting a series of in-situ bioremediation (ISB) tests as described in the Revised Treatability Study Work Plan for In-Situ Bioremediation at the Technical Area-V Groundwater Area of Concern, referred to as the Revised Work Plan in this FIP. The Treatability Study is designed to gravity inject an electron-donor substrate and bioaugmentation bacteria into groundwater via three injection wells to perform bioremediation of the constituents of concern (COCs), nitrate and trichloroethene (TCE), in the regions with the highest concentrations at the Technical Area-Vmore » Groundwater (TAVG) Area of Concern (AOC). The Treatability Study will evaluate the effectiveness of bioremediation solution delivery and COC treatment over time. This FIP is designed for SNL/NM work planning and management. It is not intended to be submitted for regulator’s approval. The technical details presented in this FIP are subject to change based on field conditions, availability of equipment and materials, feasibility, and inputs from Sandia personnel and Aboveground Injection System contractor.« less

  10. Strategic planning for clinical services: St. Joseph Hospital and Health Care Center.

    PubMed

    Linggi, A; Pelham, L D

    1986-09-01

    A pharmacy department at a 340-bed community hospital based its strategic plan for developing patient-oriented services on a sound drug distribution system, a credible work-measurement program, and fiscal responsibility. In 1982 the department of pharmacy and i.v. therapy implemented a strategic plan for improving pharmaceutical services. The plan involved developing goals and objectives for the department; marketing the department's services and fiscal management to hospital administrators, medical staff, and nursing staff; building teamwork among the pharmacy staff; and improving the drug distribution system before instituting clinical services. Hiring of additional pharmacy staff was justified on the basis of work-measurement data. By adjusting staffing levels every two weeks based on work-measurement data, the department increased the efficiency of drug distribution activities; the pharmacy also implemented cost-saving programs like selection of therapeutic alternates and formulary restrictions. The savings were then reinvested in labor-intensive patient-oriented pharmaceutical services. A staff development program using staff pharmacists as preceptors expanded the breadth and depth of pharmacists' clinical skills. The planning efforts were successful because the needs of hospital administrators, the pharmacy department, and staff members were addressed.

  11. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  12. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  13. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  14. 40 CFR 49.154 - Permit application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., production rates and operating schedules. (vii) Identification and description of any existing air pollution... pollution prevention techniques, air pollution control devices, design standards, equipment standards, work... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions...

  15. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  16. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  17. Pathways to Program Success: A Qualitative Comparative Analysis (QCA) of Communities Putting Prevention to Work Case Study Programs

    PubMed Central

    Kane, Heather; Hinnant, Laurie; Day, Kristine; Council, Mary; Tzeng, Janice; Soler, Robin; Chambard, Megan; Roussel, Amy; Heirendt, Wendy

    2016-01-01

    Objective To examine the elements of capacity, a measure of organizational resources supporting program implementation that result in successful completion of public health program objectives in a public health initiative serving 50 communities. Design We used crisp set Qualitative Comparative Analysis (QCA) to analyze case study and quantitative data collected during the evaluation of the Communities Putting Prevention to Work (CPPW) program. Setting CPPW awardee program staff and partners implemented evidence-based public health improvements in counties, cities, and organizations (eg, worksites, schools). Participants Data came from case studies of 22 CPPW awardee programs that implemented evidence-based, community-and organizational-level public health improvements. Intervention Program staff implemented a range of evidence-based public health improvements related to tobacco control and obesity prevention. Main Outcome Measure The outcome measure was completion of approximately 60% of work plan objectives. Results Analysis of the capacity conditions revealed 2 combinations for completing most work plan objectives: (1) having experience implementing public health improvements in combination with having a history of collaboration with partners; and (2) not having experience implementing public health improvements in combination with having leadership support. Conclusion Awardees have varying levels of capacity. The combinations identified in this analysis provide important insights into how awardees with different combinations of elements of capacity achieved most of their work plan objectives. Even when awardees lack some elements of capacity, they can build it through strategies such as hiring staff and engaging new partners with expertise. In some instances, lacking 1 or more elements of capacity did not prevent an awardee from successfully completing objectives. Implications for Policy & Practice These findings can help funders and practitioners recognize and assemble different aspects of capacity to achieve more successful programs; awardees can draw on extant organizational strengths to compensate when other aspects of capacity are absent. PMID:27598714

  18. Manpower Planning for Municipal Wastewater Treatment in Texas, LP-8.

    ERIC Educational Resources Information Center

    Texas State Dept. of Water Resources, Austin.

    This report presents the implementation results of a pilot test of a manpower planning methodology developed by the U.S. Environmental Protection Agency (EPA), Office of Water Programs. Project outputs and projections are described and illustrated in sections of the report dealing with work to be done, organizational staffing plan, transfers and…

  19. THE DEVELOPMENT OF A QUALITY ASSURANCE PROJECT PLAN FOR THE U.S. EPA DIOXIN EXPOSURE INITIATIVE PROGRAM

    EPA Science Inventory

    All projects planned and implemented under the EPA Dioxin Exposure Initiative (DEI) are required to have completed Quality Assurance Project Plans (QAPPs) EPA Order 5360.1 A2 states, All work funded by the United States Environmental Protection Agency (EPA) that involves the ...

  20. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor... action plans. (a) Scope and application. This section requires all employers to develop and implement an...

  1. Environmental Implementation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less

  2. Does This Really Work? The Keys to Implementing New Technology while Providing Evidence that Technology Is Successful

    ERIC Educational Resources Information Center

    Sawtelle, Sara

    2008-01-01

    Proving that technology works is not as simple as proving that a new vendor for art supplies is more cost effective. Technology effectiveness requires both the right software and the right implementation. Just having the software is not enough. Proper planning, training, leadership, support, pedagogy, and software use--along with many other…

  3. What happened to the no-wait hospital? A case study of implementation of operational plans for reduced waits.

    PubMed

    Hansson, Johan; Tolf, Sara; Øvretveit, John; Carlsson, Jan; Brommels, Mats

    2012-01-01

    Both research and practice show that waiting lists are hard to reduce. Implementing complex interventions for reduced waits is an intricate and challenging process that requires special attention for surrounding factors helping and hindering the implementation. This article reports a case study of a hospital implementation of operational plans for reduced waits, with an emphasis on the process of change. A case study research design, theoretically informed by the Pettigrew and Whipp model of strategic change, was applied. Data were gathered from individual and focus group interviews with informants from different organizational levels at different times and from documents and plans. The findings revealed arrangements both helping and hindering the implementation work. Helping factors were the hospital's contemporary savings requirements and experiences from similar change initiatives. Those hindering the actions to plan and agree the changes were unclear support functions and unclear task prioritization. One contribution of this study is to demonstrate the advantages, disadvantages, and challenges of a contextualized case study for increased understanding of factors influencing organizational change implementation. One lesson for current policy is to regard context factors that are critical for successful implementation.

  4. Work-life balance among shift workers: results from an intervention study about self-rostering.

    PubMed

    Albertsen, Karen; Garde, Anne Helene; Nabe-Nielsen, Kirsten; Hansen, Ase Marie; Lund, Henrik; Hvid, Helge

    2014-04-01

    The aims of the study were to explore the effects of the implementation of IT-based tools for planning of rosters among shift workers on work-family-related outcomes and to interpret the results in light of the different implementation processes. A quasi-experimental intervention study was conducted with 12-month follow-up at 14 intervention and 14 reference worksites in Denmark. Workplaces planning to introduce IT-supported self-rostering were recruited, and three different kinds of interventions were implemented. Intervention A and B aimed at increasing workers satisfaction and well-being, while intervention C was designed to optimize the personnel resources. Questionnaire data were collected from 840 employees at baseline and 784 at follow-up. Process evaluation encompassed interviews with about 25 employees and 15 managers at baseline and follow-up. Work-family-related outcomes were work-life conflicts, work-life facilitation, marital conflicts and time with children. An overall decline in work-family conflicts and increase in work-family facilitation were found in the total intervention group. More specifically, in group B, work-family conflicts and marital conflicts decreased while work-family facilitation increased. In group C, work-family conflicts increased while work-family facilitation and time spend with children decreased, and no significant changes were observed in the reference group and in group A. An overall positive effect of the implementation of self-rostering was found on the balance between work and private life. However, results from the process evaluation suggested that the organizational aim with the intervention was crucial for the effect.

  5. A Bibliography of Literature on Planned or Implemented Automated Library Projects, Part I; Volume 9, World Survey Series.

    ERIC Educational Resources Information Center

    Patrinostro, Frank S., Comp.; Sanders, Nancy P., Ed.

    The primary purposes of this bibliography are to present an overview of published works which relate to the use of new technologies in library operations, to call attention to a number of valuable reference works published on the subject, and to assist librarians and library systems scientists who are engaged in the planning and/or implementation…

  6. Exploring the Effects of Cultural Variables in the Implementation of Behavior-Based Safety in Two Organizations

    ERIC Educational Resources Information Center

    Bumstead, Alaina; Boyce, Thomas E.

    2005-01-01

    The present case study examines how culture can influence behavior-based safety in different organizational settings and how behavior-based safety can impact different organizational cultures. Behavior-based safety processes implemented in two culturally diverse work settings are described. Specifically, despite identical implementation plans,…

  7. Flexible benefits plans. Perceptions of their effectiveness.

    PubMed

    Agho, A O

    1995-01-01

    Flexible benefits plans have been used in businesses since the 1970s to control healthcare costs and meet the needs of an increasingly diverse work force. More recently, healthcare organizations have begun to implement the flexible benefits concept. This study collected data from human resources executives at hospitals with and without flex plans to investigate how they perceive the effectiveness of and the problems associated with such plans.

  8. CO2 Sparging Work Plan, LCP Chemicals

    EPA Pesticide Factsheets

    April 24, 2013 plan prepared by Mutch Associates, LLC for implementation of full-scale CO2 sparging of the subsurface caustic brine pool (CBP) at the LCP Chemicals site in Brunswick, Georgia. Region ID: 04 DocID: 10941341, DocDate: 04-24-2013

  9. Work Program & Cost Estimate: Highway Planning, Research, Development and Implementation. Fiscal Year 2001

    DOT National Transportation Integrated Search

    2000-06-01

    The Intermodal Surface Transportation Act of 1991 (ISTEA) contained provisions for the State Planning and Research (SPR) funding that are largely retained in the current legislation, the Transportation Equity Act for the 21st Century (TEA-21), passed...

  10. National Sample Assessment Protocols

    ERIC Educational Resources Information Center

    Ministerial Council on Education, Employment, Training and Youth Affairs (NJ1), 2012

    2012-01-01

    These protocols represent a working guide for planning and implementing national sample assessments in connection with the national Key Performance Measures (KPMs). The protocols are intended for agencies involved in planning or conducting national sample assessments and personnel responsible for administering associated tenders or contracts,…

  11. Child Care and Development Fund: Report of State Plans FY 2002-2003.

    ERIC Educational Resources Information Center

    Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…

  12. Strengthening government health and family planning programs: findings from an action research project in rural Bangladesh.

    PubMed

    Simmons, R; Phillips, J F; Rahman, M

    1984-01-01

    An ongoing study at the International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B) is based on the premise that public sector health and family planning programs can be improved through an assessment of the dysfunctional aspects of their operations, the development of problem-solving capabilities, and the transfer of strategies successfully tested in a small-scale pilot project. This paper reports findings from a field trial implemented in a subunit of the project area at an early stage of the project. Operational barriers to public sector program implementation are discussed with regard to the quantity of work, the quality of work, supplies and facilities, integration of health and family planning, and leadership, supervision, and decision making. Initial results of the ICDDR,B intervention on these managerial processes are also indicated.

  13. The Effectiveness of Teacher Work between Permanent and Non-Permanent Teachers on the Implementation of School-Based Management in Muhammadiyah Metro Elementary School

    ERIC Educational Resources Information Center

    Juhri, A. M.; Tri, Y. H.; Agus, S.

    2017-01-01

    The study aims to obtain empirical evidence of the differences in the effectiveness of work on several aspects, including preparing and planning learning activities, the implementation of public administration, responsibility, and task. The study was carried out between the two groups, which were permanent and nonpermanent teachers in Muhamamdiyah…

  14. Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacDonald, Jennifer C.

    2012-07-01

    DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)

  15. An Expert Supervisor For A Robotic Work Cell

    NASA Astrophysics Data System (ADS)

    Moed, M. C.; Kelley, R. B.

    1988-02-01

    To increase task flexibility in a robotic assembly environment, a hierarchical planning and execution system is being developed which will map user specified 3D part assembly tasks into various target robotic work cells, and execute these tasks efficiently using manipulators and sensors available in the work cell. One level of this hierarchy, the Supervisor, is responsible for assigning subtasks of a system generated Task Plan to a set of task specific Specialists and on-line coordination of the activity of these Specialists to accomplish the user specified assembly. The design of the Supervisor can be broken down into five major functional blocks: resource management; concurrency detection; task scheduling; error recovery; and interprocess communication. The Supervisor implementation has been completed on a VAX 11/750 under a Unix environment. PC card Pick-Insert experiments were performed to test this implementation. To test the robustness of the architecture, the Supervisor was then transported to a new work cell under a VMS environment. The experiments performed under Supervisor control in both implementations are discussed after a brief explanation of the functional blocks of the Supervisor and the other levels in the hierarchy.

  16. Evidence implementation: Development of an online methodology from the knowledge-to-action model of knowledge translation.

    PubMed

    Lockwood, Craig; Stephenson, Matthew; Lizarondo, Lucylynn; van Den Hoek, Joan; Harrison, Margaret

    2016-08-01

    This paper describes an online facilitation for operationalizing the knowledge-to-action (KTA) model. The KTA model incorporates implementation planning that is optimally suited to the information needs of clinicians. The can-implement(©) is an evidence implementation process informed by the KTA model. An online counterpart, the can-implement.pro(©) , was developed to enable greater dissemination and utilization of the can-implement(©) process. The driver for this work was health professionals' need for facilitation that is iterative, informed by context and localized to the specific needs of users. The literature supporting this paper includes evaluation studies and theoretical concepts relevant to KTA model, evidence implementation and facilitation. Nursing and other health disciplines require a skill set and resources to successfully navigate the complexity of organizational requirements, inter-professional leadership and day-to-day practical management to implement evidence into clinical practice. The can-implement.pro(©) provides an accessible, inclusive system for evidence implementation projects. There is empirical support for evidence implementation informed by the KTA model, which in this phase of work has been developed for online uptake. Nurses and other clinicians seeking to implement evidence could benefit from the directed actions, planning advice and information embedded in the phases and steps of can-implement.pro(©) . © 2016 John Wiley & Sons Australia, Ltd.

  17. Defense Inventory: Services Generally Have Reduced Excess Inventory, but Additional Actions Are Needed

    DTIC Science & Technology

    2015-04-01

    MICAP Mission Impaired Capability Awaiting Parts OSD Office of the Secretary of Defense S & OP Sales and Operations Planning This is a work of...January 2013, the Army began to implement a Sales and Operations Planning ( S & OP ) process to improve its supply chain and inventory management...According to the Army Materiel Command officials, the Army’s decision to implement S & OP was recommended by an Integrated Project Team that concluded the

  18. Restructuring: A School-Based Plan of Action.

    ERIC Educational Resources Information Center

    Rothberg, Robert A.; Bozeman, William C.

    The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…

  19. Supporting Academic Language Development in Elementary Science: A Classroom Teaching Experiment

    NASA Astrophysics Data System (ADS)

    Jung, Karl Gerhard

    Academic language is the language that students must engage in while participating in the teaching and learning that takes place in school (Schleppegrell, 2012) and science as a content area presents specific challenges and opportunities for students to engage with language (Buxton & Lee, 2014; Gee, 2005). In order for students to engage authentically and fully in the science learning that will take place in their classrooms, it is important that they develop their abilities to use science academic language (National Research Council, 2012). For this to occur, teachers must provide support to their students in developing the science academic language they will encounter in their classrooms. Unfortunately, this type of support remains a challenge for many teachers (Baecher, Farnsworth, & Ediger, 2014; Bigelow, 2010; Fisher & Frey, 2010) and teachers must receive professional development that supports their abilities to provide instruction that supports and scaffolds students' science academic language use and development. This study investigates an elementary science teacher's engagement in an instructional coaching partnership to explore how that teacher planned and implemented scaffolds for science academic language. Using a theoretical framework that combines the literature on scaffolding (Bunch, Walqui, & Kibler, 2015; Gibbons, 2015; Sharpe, 2001/2006) and instructional coaching (Knight, 2007/2009), this study sought to understand how an elementary science teacher plans and implements scaffolds for science academic language, and the resources that assisted the teacher in planning those scaffolds. The overarching goal of this work is to understand how elementary science teachers can scaffold language in their classroom, and how they can be supported in that work. Using a classroom teaching experiment methodology (Cobb, 2000) and constructivist grounded theory methods (Charmaz, 2014) for analysis, this study examined coaching conversations and classroom instruction to identify and understand what scaffolds are planned and implemented, and how that planning and implementation occurred through an instructional coaching partnership. Findings from this study showed the elementary science teacher planned and implemented a number of scaffolds for science academic language, focusing primarily on the use of sentence starters as a scaffolding strategy. The findings also indicated that the instructional coaching partnership played a vital role as the main resource that assisted the planning of scaffolds. These findings provide insights into the types of scaffolds that elementary science teachers can implement to scaffold science academic language, and the role that instructional coaching can play in supporting teachers as they work to provide instruction that scaffolds their students' language use and development.

  20. Using the Consolidated Framework for Implementation Research to implement and evaluate national surgical planning

    PubMed Central

    Saluja, Saurabh; Silverstein, Allison; Mukhopadhyay, Swagoto; Lin, Yihan; Raykar, Nakul; Keshavjee, Salmaan; Samad, Lubna; Meara, John G

    2017-01-01

    The Lancet Commission on Global Surgery defined six surgical indicators and a framework for a national surgical plan that aimed to incorporate surgical care as a part of global public health. Multiple countries have since begun national surgical planning; each faces unique challenges in doing so. Implementation science can be used to more systematically explain this heterogeneous process, guide implementation efforts and ultimately evaluate progress. We describe our intervention using the Consolidated Framework for Implementation Research. This framework requires identifying characteristics of the intervention, the individuals involved, the inner and outer setting of the intervention, and finally describing implementation processes. By hosting a consultative symposium with clinicians and policy makers from around the world, we are able to specify key aspects of each element of this framework. We define our intervention as the incorporation of surgical care into public health planning, identify local champions as the key individuals involved, and describe elements of the inner and outer settings. Ultimately we describe top-down and bottom-up models that are distinct implementation processes. With the Consolidated Framework for Implementation Research, we are able to identify specific strategic models that can be used by implementers in various settings. While the integration of surgical care into public health throughout the world may seem like an insurmountable challenge, this work adds to a growing effort that seeks to find a way forward. PMID:29225930

  1. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    PubMed

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  2. Sector Activities and Lessons Learned Around Initial Implementation of the United States National Physical Activity Plan

    PubMed Central

    Evenson, Kelly R.; Satinsky, Sara B.

    2016-01-01

    Background National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. Methods During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. Results The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. Conclusions These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans. PMID:24176800

  3. Implementation of a multi-professional standardized care plan in electronic health records for the care of stroke patients.

    PubMed

    Pöder, Ulrika; Fogelberg-Dahm, Marie; Wadensten, Barbro

    2011-09-01

    To compare staff opinions about standardized care plans and self-reported habits with regard to documentation, and their perceived knowledge about the evidence-based guidelines in stroke care before and after implementation of an evidence-based-standardized care plan (EB-SCP) and quality standard for stroke care. The aim was also to describe staff opinions about, and their use of, the implemented EB-SCP. To facilitate evidence-based practice (EBP), a multi-professional EB-SCP and quality standard for stroke care was implemented in the electronic health record (EHR). Quantitative, descriptive and comparative, based on questionnaires completed before and after implementation. Perceived knowledge about evidence-based guidelines in stroke care increased after implementation of the EB-SCP. The majority agreed that the EB-SCP is useful and facilitates their work. There was no change between before and after implementation with regard to opinions about standardized care plans, self-reported documentation habits or time spent on documentation. An evidence-based SCP seems to be useful in patient care and improves perceived knowledge about evidence-based guidelines in stroke care. For nursing managers, introduction of evidence-based SCP in the EHR may improve the prerequisites for promoting high-quality EBP in multi-professional care. 2011 Blackwell Publishing Ltd.

  4. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less

  5. MRP (materiel requirements planning) II implementation: a case study.

    PubMed

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  6. Group Work. Research Brief

    ERIC Educational Resources Information Center

    Walker, Karen

    2010-01-01

    According to Johnson and Johnson, group work helps increase student retention and satisfaction, develops strong oral communication and social skills, as well as higher self-esteem (University of Minnesota, n.d.). Group work, when planned and implemented deliberately and thoughtfully helps students develop cognitive and leadership skills as well as…

  7. 2007 Precision Strike PEO Summer Forum - Joint Perspectives on Precision Engagement

    DTIC Science & Technology

    2007-07-11

    Status,” Colonel Richard Justice, USAF—Commander of the Miniature Munitions Systems Group (MMSG), Eglin Air Force Base “Unmanned Systems (UAS) Roadmap...Role in the Roadmap Implementation Methods & Processes Working Group Issues delineated in Implementation Plan form basis for JTEM methodology...Test and Evaluation JMETC – Joint Mission Environment Test Capability WG – Working Group DOT&E AT&L DOT&E Unclassified 5 Background: JTEM Problem

  8. Conservation planning and accomplishments for protection of Cerulean Warbler (Setophaga cerulea) nonbreeding habitat

    Treesearch

    Benjamin Skolnik; David Wiedenfeld; Randy Dettmers; Constantino Aucca; Lina Daza; Heidy Valle; Francisco Sornoza; Javier Robayo; David Diaz; Jane Fitzgerald; Daniel Lebbin; Paul B. Hamel

    2012-01-01

    Vital to the work of the Cerulean Warbler Technical Group has been the collaboration among members to evaluate population status and coordinate planning for future activities, principally in conservation implementation. Two plans have been produced, one a general strategy for the conservation and management of the species over its entire range, and a more restricted...

  9. Assessment to Guide Individualized Transition Plans from School to Post-School for Children Ages 14+ with Moderate Disabilities

    ERIC Educational Resources Information Center

    Skidmore, Kevin

    2014-01-01

    As a part of the Individualized Education Plan (IEP), special education teachers work along with their student with special needs and their parent(s)/guardian(s) to create and implement Individualized Transition Plans (ITP) to assist the student with their transition to the post-school environment. As mandated by Individuals with Disabilities…

  10. Long Range Facilities Planning and Design Implementation for Students with Disabilities: A Guide for New Jersey School Districts

    ERIC Educational Resources Information Center

    Lowenkron, Ruth; Ponessa, Joan

    2005-01-01

    The long range facilities planning (LRFP) process presents a wonderful opportunity for New Jersey's school districts to re-examine and strengthen their long term planning for educational adequacy in 21st century school facilities. It provides an opportunity for districts to work closely with the special education community to ensure that New…

  11. Comments on "Women, Development Planning and Government Policies in Pakistan".

    PubMed

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social will was one of the most significant gaps between policy and implementation that was the article's focus. Has the Ministry of Women in Development really been given administrative authority to promote social change?

  12. Teaching the Public Relations Campaigns Course.

    ERIC Educational Resources Information Center

    Worley, Debra A.

    2001-01-01

    Argues for a Campaign Planning Course in the undergraduate public relations major. Discusses nine course objectives. Describes five phases of campaign planning and implementation, how the phase approach includes important course topics, and how it fulfills course objectives. Describes how student groups work with actual clients throughout the…

  13. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  14. Changes in the Precision of a Study from Planning Phase to Implementation Phase: Evidence from the First Wave of Group Randomized Trials Launched by the Institute of Education Sciences

    ERIC Educational Resources Information Center

    Spybrook, Jessaca; Lininger, Monica; Cullen, Anne

    2011-01-01

    The purpose of this study is to extend the work of Spybrook and Raudenbush (2009) and examine how the research designs and sample sizes changed from the planning phase to the implementation phase in the first wave of studies funded by IES. The authors examine the impact of the changes in terms of the changes in the precision of the study from the…

  15. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  16. PLANNING AND COORDINATION OF ACTIVITIES SUPPORTING THE RUSSIAN SYSTEM OF CONTROL AND ACCOUNTING OF NUCLEAR MATERIALS AT ROSATOM FACILITIES IN THE FRAMEWORK OF THE U.S.-RUSSIAN COOPERATION.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SVIRIDOVA, V.V.; ERASTOV, V.V.; ISAEV, N.V.

    2005-05-16

    The MC&A Equipment and Methodological Support Strategic Plan (MEMS SP) for implementing modern MC&A equipment and methodologies at Rosatom facilities has been developed within the framework of the U.S.-Russian MPC&A Program. This plan developed by the Rosatom's Russian MC&A Equipment and Methodologies (MEM) Working Group and is coordinated by that group with support and coordination provided by the MC&A Measurements Project, Office of National Infrastructure and Sustainability, US DOE. Implementation of different tasks of the MEMS Strategic Plan is coordinated by Rosatom and US-DOE in cooperation with different U.S.-Russian MC&A-related working groups and joint site project teams. This cooperation allowsmore » to obtain and analyze information about problems, current needs and successes at Rosatom facilities and facilitates solution of the problems, satisfying the facilities' needs and effective exchange of expertise and lessons learned. The objective of the MEMS Strategic Plan is to enhance effectiveness of activities implementing modern equipment and methodologies in the Russian State MC&A system. These activities are conducted within the joint Russian-US MPC&A program aiming at reduction of possibility for theft or diversion of nuclear materials and enhancement of control of nuclear materials.« less

  17. Nurses' views regarding implementing advance care planning for older people: a systematic review and synthesis of qualitative studies.

    PubMed

    Ke, Li-Shan; Huang, Xiaoyan; O'Connor, Margaret; Lee, Susan

    2015-08-01

    To explore nurses' views regarding implementing advance care planning for older people. Advance care planning is recommended as a way for older people to discuss their future care with family members and health professionals. Nurses play key roles in the process of advance care planning, including ensuring that patients are informed of their rights and that decisions are known to, and respected by, the health care team. Thus, understanding of nurses' experiences and perspectives regarding implementing advance care planning for older people is a significant topic for review. Qualitative meta-synthesis. Four databases including CINAHL plus, Medline [EBSCOhost], EMBASE, and PsycINFO were searched, and 1844 articles were initially screened. Finally, 18 articles were critically appraised and a thematic synthesis was undertaken. Four themes were identified regarding implementation of advance care planning: perceived disadvantages and advantages of advance directives; nurses' responsibility and roles; facilitators and barriers; and nurses' needs and recommendations. Nurses felt that advance directives provided more advantages than disadvantages. Nurses generally believed that they were well positioned to engage in advance care planning conversations. Nurses perceived barriers relating to older people, families, environment, time, culture, cost, language and knowledge of health care teams with regard to advance care planning. In nurses' needs, education and support were highlighted. This study provides useful knowledge for implementing advance care planning through illustrating nurses' experiences and perspectives. The results showed that nurses were more concerned about barriers in relation to working environment, teamwork, time and knowledge of health care team members than older people's characteristics, when implementing advance care planning. The findings provide nurses and administrators with information to develop related policies and education. Additionally, the appointment of nurses to formal roles related to advance care planning is appropriate and warranted. © 2015 John Wiley & Sons Ltd.

  18. Geriatric hip fracture management: keys to providing a successful program.

    PubMed

    Basu, N; Natour, M; Mounasamy, V; Kates, S L

    2016-10-01

    Hip fractures are a common event in older adults and are associated with significant morbidity, mortality and costs. This review examines the necessary elements required to implement a successful geriatric fracture program and identifies some of the barriers faced when implementing a successful program. The Geriatric Fracture Center (GFC) is a treatment model that standardizes the approach to the geriatric fracture patient. It is based on five principles: surgical fracture management; early operative intervention; medical co-management with geriatricians; patient-centered, standard order sets to employ best practices; and early discharge planning with a focus on early functional rehabilitation. Implementing a geriatric fracture program begins with an assessment of the hospital's data on hip fractures and standard care metrics such as length of stay, complications, time to surgery, readmission rates and costs. Business planning is essential along with the medical planning process. To successfully develop and implement such a program, strong physician leadership is necessary to articulate both a short- and long-term plan for implementation. Good communication is essential-those organizing a geriatric fracture program must be able to implement standardized plans of care working with all members of the healthcare team and must also be able to foster relationships both within the hospital and with other institutions in the community. Finally, a program of continual quality improvement must be undertaken to ensure that performance outcomes are improving patient care.

  19. Shifting Resources and Focus to Meet the Goals of the National HIV/AIDS Strategy: The Enhanced Comprehensive HIV Prevention Planning Project, 2010–2013

    PubMed Central

    Purcell, David W.; Fisher, Holly H.; Belcher, Lisa; Carey, James W.; Courtenay-Quirk, Cari; Dunbar, Erica; Eke, Agatha N.; Galindo, Carla A.; Glassman, Marlene; Margolis, Andrew D.; Neumann, Mary Spink; Prather, Cynthia; Stratford, Dale; Taylor, Raekiela D.; Mermin, Jonathan

    2016-01-01

    In September 2010, CDC launched the Enhanced Comprehensive HIV Prevention Planning (ECHPP) project to shift HIV-related activities to meet goals of the 2010 National HIV/AIDS Strategy (NHAS). Twelve health departments in cities with high AIDS burden participated. These 12 grantees submitted plans detailing jurisdiction-level goals, strategies, and objectives for HIV prevention and care activities. We reviewed plans to identify themes in the planning process and initial implementation. Planning themes included data integration, broad engagement of partners, and resource allocation modeling. Implementation themes included organizational change, building partnerships, enhancing data use, developing protocols and policies, and providing training and technical assistance for new and expanded activities. Pilot programs also allowed grantees to assess the feasibility of large-scale implementation. These findings indicate that health departments in areas hardest hit by HIV are shifting their HIV prevention and care programs to increase local impact. Examples from ECHPP will be of interest to other health departments as they work toward meeting the NHAS goals. PMID:26843670

  20. Implementation of a software for REmote COMparison of PARticlE and photon treatment plans: ReCompare.

    PubMed

    Löck, Steffen; Roth, Klaus; Skripcak, Tomas; Worbs, Mario; Helmbrecht, Stephan; Jakobi, Annika; Just, Uwe; Krause, Mechthild; Baumann, Michael; Enghardt, Wolfgang; Lühr, Armin

    2015-09-01

    To guarantee equal access to optimal radiotherapy, a concept of patient assignment to photon or particle radiotherapy using remote treatment plan exchange and comparison - ReCompare - was proposed. We demonstrate the implementation of this concept and present its clinical applicability. The ReCompare concept was implemented using a client-server based software solution. A clinical workflow for the remote treatment plan exchange and comparison was defined. The steps required by the user and performed by the software for a complete plan transfer were described and an additional module for dose-response modeling was added. The ReCompare software was successfully tested in cooperation with three external partner clinics and worked meeting all required specifications. It was compatible with several standard treatment planning systems, ensured patient data protection, and integrated in the clinical workflow. The ReCompare software can be applied to support non-particle radiotherapy institutions with the patient-specific treatment decision on the optimal irradiation modality by remote treatment plan exchange and comparison. Copyright © 2015. Published by Elsevier GmbH.

  1. Edward W. Jennings | NREL

    Science.gov Websites

    practices promoting a safe and supportive working environment. His research interests include environmental, safety, and health (ESH) and facility issues, he is responsible for implementing safe work plan; working directly with awardees by performing on-site validations to collect and analyze enzyme

  2. Effect of an institutional development plan for user participation on professionals' knowledge, practice, and attitudes. A controlled study

    PubMed Central

    2011-01-01

    Background Governments in several countries attempt to strengthen user participation through instructing health care organisations to plan and implement activities such as user representation in administrational boards, improved information to users, and more individual user participation in clinical work. The professionals are central in implementing initiatives to enhance user participation in organisations, but no controlled studies have been conducted on the effect on professionals from implementing institutional development plans. The objective was to investigate whether implementing a development plan intending to enhance user participation in a mental health hospital had any effect on the professionals' knowledge, practice, or attitudes towards user participation. Methods This was a non-randomized controlled study including professionals from three mental health hospitals in Central Norway. A development plan intended to enhance user participation was implemented in one of the hospitals as a part of a larger re-organizational process. The plan included i.e. establishing a patient education centre and a user office, purchasing of user expertise, appointing contact professionals for next of kin, and improving of the centre's information and the professional culture. The professionals at the intervention hospital thus constituted the intervention group, while the professionals at two other hospitals participated as control group. All professionals were invited to answer the Consumer Participation Questionnaire (CPQ) and additional questions, focusing on knowledge, practice, and attitudes towards user participation, two times with a 16 months interval. Results A total of 438 professionals participated (55% response rate). Comparing the changes in the intervention group with the changes in the control group revealed no statistically significant differences at a 0.05 level. The implementation of the development plan thus had no measurable effect on the professionals' knowledge, practice, or attitudes at the intervention hospital, compared to the control hospitals. Conclusion This is the first controlled study on the effect on professionals from implementing a development plan to enhance user participation in a mental health hospital. The plan had no effect on professionals' knowledge, practice, or attitudes. This can be due to the quality of the development plan, the implementation process, and/or the suitability of the outcome measures. PMID:22047466

  3. Effect of an institutional development plan for user participation on professionals' knowledge, practice, and attitudes. A controlled study.

    PubMed

    Rise, Marit By; Grimstad, Hilde; Solbjør, Marit; Steinsbekk, Aslak

    2011-11-02

    Governments in several countries attempt to strengthen user participation through instructing health care organisations to plan and implement activities such as user representation in administrational boards, improved information to users, and more individual user participation in clinical work. The professionals are central in implementing initiatives to enhance user participation in organisations, but no controlled studies have been conducted on the effect on professionals from implementing institutional development plans. The objective was to investigate whether implementing a development plan intending to enhance user participation in a mental health hospital had any effect on the professionals' knowledge, practice, or attitudes towards user participation. This was a non-randomized controlled study including professionals from three mental health hospitals in Central Norway. A development plan intended to enhance user participation was implemented in one of the hospitals as a part of a larger re-organizational process. The plan included i.e. establishing a patient education centre and a user office, purchasing of user expertise, appointing contact professionals for next of kin, and improving of the centre's information and the professional culture. The professionals at the intervention hospital thus constituted the intervention group, while the professionals at two other hospitals participated as control group. All professionals were invited to answer the Consumer Participation Questionnaire (CPQ) and additional questions, focusing on knowledge, practice, and attitudes towards user participation, two times with a 16 months interval. A total of 438 professionals participated (55% response rate). Comparing the changes in the intervention group with the changes in the control group revealed no statistically significant differences at a 0.05 level. The implementation of the development plan thus had no measurable effect on the professionals' knowledge, practice, or attitudes at the intervention hospital, compared to the control hospitals. This is the first controlled study on the effect on professionals from implementing a development plan to enhance user participation in a mental health hospital. The plan had no effect on professionals' knowledge, practice, or attitudes. This can be due to the quality of the development plan, the implementation process, and/or the suitability of the outcome measures.

  4. 76 FR 10089 - Value-Added Producer Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...

  5. Innovation and Diffusion--An Anthropological View.

    ERIC Educational Resources Information Center

    du Toit, Brian M.

    This chapter presents the anthropological theory of innovation and diffusion, and applies it to the problem of implementing planned change within the instructional development process. The work of Barnett and others on culture and planned culture change is described and applied to the educational system and the classroom environment. Barnett's…

  6. Guidelines for Implementing a Real Estate Cooperative Education Program.

    ERIC Educational Resources Information Center

    Pearson, Thomas R.

    Background information and guidelines are provided for the development of cooperative education programs for real estate industry personnel. The first section outlines the operation of cooperative education programs and presents two organizational plans: the alternating plan, where students attend class full-time and work full-time during…

  7. Rewiring a Working Library or Teaching an Old Dog New Tricks.

    ERIC Educational Resources Information Center

    White, Robert L.; Jaffe, Lee David

    1995-01-01

    This case study describes the planning, funding, and implementation of a complete data-wiring renovation at the University of California, Santa Cruz library. Highlights include design principles; project schedule; benefits for staff's electronic mail and network use and for upgraded public terminals; and the importance of planning and…

  8. The Volpe Center GPS Adjacent Band Compatibility Program Plan : GPS Adjacent Band Compatibility Workshop, Volpe Center, Cambridge MA

    DOT National Transportation Integrated Search

    2014-09-18

    Approach to DOT GPS Adjacent Band Compatibility Assessment. Identify forums and provide public outreach to make sure the progress and work are as open and transparent as possible. Develop an implementation plan that incorporates aspects from the DOT ...

  9. Care plans and care planning in long-term conditions: a conceptual model.

    PubMed

    Burt, Jenni; Rick, Jo; Blakeman, Thomas; Protheroe, Joanne; Roland, Martin; Bower, Pete

    2014-10-01

    The prevalence and impact of long-term conditions continues to rise. Care planning for people with long-term conditions has been a policy priority for chronic disease management in a number of health-care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between 'care planning' (the process by which health-care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a 'care plan' (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health-care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans.

  10. Reasoning with inaccurate spatial knowledge. [for Planetary Rover

    NASA Technical Reports Server (NTRS)

    Doshi, Rajkumar S.; White, James E.; Lam, Raymond; Atkinson, David J.

    1988-01-01

    This paper describes work in progress on spatial planning for a semiautonomous mobile robot vehicle. The overall objective is to design a semiautonomous rover to plan routes in unknown, natural terrains. The approach to spatial planning involves deduction of common-sense spatial knowledge using geographical information, natural terrain representations, and assimilation of new and possibly conflicting terrain information. This report describes the ongoing research and implementation.

  11. Child Care and Development Fund: Report of State Plans for the Period 10/01/99 to 9/30/01.

    ERIC Educational Resources Information Center

    Stoney, Louise; Stanton, Nina

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report is based on the approved State Plans for the period October 1, 1999 to September 30, 2001. The analysis includes information from 48 states, the District of Columbia,…

  12. The GGOS Bureau of Networks and Observations: an update on the Space Geodesy Network and the New Implementation Plan for 2017 -18

    NASA Astrophysics Data System (ADS)

    Pearlman, Michael R.; Ma, Chopo; Neilan, Ruth; Noll, Carey; Pavlis, Erricos; Saunier, Jérôme; Schoene, Tilo; Barzaghi, Riccardo; Thaller, Daniela; Bergstrand, Sten; Mueller, Juergen

    2017-04-01

    Working with the IAG geometric services (VLBI, SLR, GNSS, and DORIS) the Bureau continues to advocate for the expansion and upgrade of the space geodesy networks for the maintenance and improvement of the reference frame and other application, and for the extension and integration with other techniques. New sites are being established following the GGOS concept of "core" and co-location sites; new technologies are being implemented to enhance performance in data yield as well as accuracy. In particular, several groups are undertaking initiatives and seeking partnerships to update existing sites and expand the networks in geographic areas void of coverage. The Bureau continues to meet with organizations to discuss possibilities of new and expanded participation and to promote the concept of partnerships. The Bureau provides the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. The Bureau monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks. The Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-off (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system on a near term plan for data products and a more comprehensive longer-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate, and improve procedures to determine systems reference points. The 2017-2018 Implementation Plan for the GGOS Bureau of Networks and Observations has been posted on the GGOS website. We will outline progress over the past two years and discuss the status of the network and updated plan.

  13. Report: Implementation Plan With Cost Sharing Methodology Needed for Region 8 Senior Environmental Employee Work on Lead Risk Reduction

    EPA Pesticide Factsheets

    Report #13-P-0430, September 24, 2013. The two Region 8 program offices that jointly implement the Lead Renovation, Repair and Painting Program do not have methodology or agreement for sharing SEE funding, which has led to confusion.

  14. Guidelines for Implementing State Skill Standards Certificate Program in Construction.

    ERIC Educational Resources Information Center

    Wisconsin State Dept. of Workforce Development, Madison.

    This packet contains guidelines, a student competency checklist, and student evaluation sheet for use in a Wisconsin school-to-work state skill standards certificate program in construction. The guidelines provide a planning resource for implementing the program, which was created in partnership with unions, employers, the state Department of…

  15. Collaborative Partnerships: A Model for Science Teacher Education and Professional Development

    ERIC Educational Resources Information Center

    Jones, Mellita M.

    2008-01-01

    This paper proposes a collaborative partnership between practicing and pre-service teachers as a model for implementing science teacher education and professional development. This model provides a structure within which partnerships will work collaboratively to plan, implement and reflect on a series of Science lessons in cycles of…

  16. Adopting best practices: "Agility" moves from software development to healthcare project management.

    PubMed

    Kitzmiller, Rebecca; Hunt, Eleanor; Sproat, Sara Breckenridge

    2006-01-01

    It is time for a change in mindset in how nurses operationalize system implementations and manage projects. Computers and systems have evolved over time from unwieldy mysterious machines of the past to ubiquitous computer use in every aspect of daily lives and work sites. Yet, disconcertingly, the process used to implement these systems has not evolved. Technology implementation does not need to be a struggle. It is time to adapt traditional plan-driven implementation methods to incorporate agile techniques. Agility is a concept borrowed from software development and is presented here because it encourages flexibility, adaptation, and continuous learning as part of the implementation process. Agility values communication and harnesses change to an advantage, which facilitates the natural evolution of an adaptable implementation process. Specific examples of agility in an implementation are described, and plan-driven implementation stages are adapted to incorporate relevant agile techniques. This comparison demonstrates how an agile approach enhances traditional implementation techniques to meet the demands of today's complex healthcare environments.

  17. Care plans and care planning in long term conditions: a conceptual model

    PubMed Central

    Burt, J; Rick, J; Blakeman, T; Protheroe, J; Roland, M; Bower, P

    2013-01-01

    The prevalence and impact of long term conditions continues to rise. Care planning for people with long term conditions has been a policy priority for chronic disease management in a number of health care systems. However, patients and providers appear unclear about the formulation and implementation of care planning. Further work in this area is therefore required to inform the development, implementation and evaluation of future care planning initiatives. We distinguish between ‘care planning’ (the process by which health care professionals and patients discuss, agree and review an action plan to achieve the goals or behaviour change of most relevance and concern to the patient) and a ‘care plan’ (a written document recording the outcome of a care planning process). We propose a typology of care planning and care plans with three core dimensions: perspective (patient or professional), scope (a focus on goals or on behaviours) and networks (confined to the professional-patient dyad or extending to the entire care network). In addition, we draw on psychological models of mediation and moderation to outline potential mechanisms through which care planning and care plans may lead to improved outcomes for both patients and the wider health care system. The proposed typology of care planning and care plans offered here, along with the model of the process by which care planning may influence outcomes, provide a useful framework for future policy developments and evaluations. Empirical work is required to explore the degree to which current care planning approaches and care plans can be described according to these dimensions, and the factors that determine which types of patients and professionals use which type of care plans. PMID:23883621

  18. Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilcox, Brian; Mellor, Russ; Michaluk, Craig

    2013-07-01

    Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysicsmore » and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)« less

  19. Extending the TSP to Systems Engineering: Early Results from Team Process Integration

    DTIC Science & Technology

    2010-08-01

    within ±10 percent of what was planned, and there were no high-priority problem reports coming out of test. Employee Work / Life Balance TPI helped improve...employee work / life balance . In order to get their job done before implementing TPI, employees rou- tinely worked overtime. With TPI (and in COMING

  20. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  1. A Model Curriculum and Program for Preretirement Planning Courses. NCCSCE Working Paper Series.

    ERIC Educational Resources Information Center

    Wilson, Gary W.; Oerke, George W.

    Intended to assist continuing education professionals in the planning and implementation of local preretirement training programs, this paper provides information on Edison State Community College's program, developed for use by industrial, commercial, and public agency employees and the general public. First, an overview is presented of the…

  2. Modular space station phase B extension program master plan

    NASA Technical Reports Server (NTRS)

    Munsey, E. H.

    1971-01-01

    The project is defined for design, development, fabrication, test, and pre-mission and mission operations of a shuttle-launched modular space station. The project management approach is described in terms of organization, management requirements, work breakdown structure, schedule, time-phased logic, implementation plans, manpower, and funding. The programmatic and technical problems are identified.

  3. Constancy and Change in Work Practice in Schools: The Role of Organizational Routines

    ERIC Educational Resources Information Center

    Sherer, Jennifer Zoltners; Spillane, James

    2011-01-01

    Background/Context: Though change is constant in organizations, determining how to successfully implement planned change has been a perennial challenge for both organizational scholars and practitioners. While the empirical knowledge base on planned change in schools and other organizations offers numerous insights, the inattention to activity, or…

  4. Reilly pulls it together with care

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiesche, E.S.

    1992-12-09

    Reilly Industries (Indianapolis) has changed strategic planning procedures to incorporate Responsible Care into its business plans. Each of the company's business units budgets for Responsible Care and reports quarterly on progress in implementing the codes, says Jacqueline Fernette, corporate communications coordinator and Responsible Care coordinator. The company's goal is to achieve full implementation by the end of 1997. In Reilly's 1993 budget, 20% of capital is directed at Responsible Care, says president Robert McNeeley. We hold unit managers responsible for planning Responsible Care within their businesses and reporting on them on a quarterly basis, says McNeeley. The firm makes pyridine,more » coal tar, potash and related chemicals, and specialized esters, and posts annual in the $250 million-$300 million range. Reilly has seven plants and 900 employees. Incorporating Responsible Care into the strategic business plan required a fair amount of administrative work to make sure that all business unit managers understood the concepts and were working in comparable terms, says McNeeley. We needed to bring the managers up to speed in six codes, so there was a training aspect to it.« less

  5. Design and Laboratory Implementation of Autonomous Optimal Motion Planning for Non-Holonomic Planetary Rovers

    DTIC Science & Technology

    2012-12-01

    autonomy helped to maximize a Mars day journey, because humans could only plan the first portion of the journey based on images sent from the rover...safe trajectory based on its sensors [1]. The distance between Mars and Earth ranges from 100-200 million miles [1] and at this distance, the time...This feature worked for the pre- planned maneuvers, which were planned by humans the day before based on available sensory and visual inputs. Once the

  6. Professional Portfolios: A Catalyst for a Collaborative Work Culture.

    ERIC Educational Resources Information Center

    Hill, Flo H.; Lofton, Glenda G.; Newman, Glenda

    In 1993-94, Louisiana began implementation of a new personnel evaluation plan that emphasized professional development. A decision was made to explore the use of a professional portfolio for each certified employee of the school system of Livingston Parish. The portfolio process was implemented in all the district's schools, but this report…

  7. 78 FR 27308 - Loan Originator Compensation Requirements Under the Truth In Lending Act (Regulation Z...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-10

    ... implementation of its new mortgage rules (Implementation Plan),\\3\\ under which the Bureau would work with the... dwelling.\\4\\ The prohibition applies to credit life, credit disability, credit unemployment, credit... proposal. The Bureau believes that the temporary delay would balance the need for consumers to receive the...

  8. Improving health sector travel.

    PubMed

    Hurdle, David; Davis, Adrian

    2004-10-01

    Preventing ill health and obesity and building more physical activity into our daily lives have never been so high on the agenda, and the way we travel can help. Many workplaces and schools are drawing up travel plans, with the aims usually to minimise car use and encourage healthier and more environmentally friendly travel. The Transport White Paper of 1998 advocated travel plans and singled out hospitals for action. Travel plans continue to be a focus within the latest Transport White Paper, launched in July 2004. This article covers various prompts to the health sector to implement travel plans. It addresses issues and concerns facing NHS Trusts, the practical things Trusts can do, and the increasing amount of good practice available. Finally, it demonstrates that travel plans can work, and are working, in the health sector.

  9. "During early implementation you just muddle through": factors that impacted a statewide arthritis program's implementation.

    PubMed

    Conte, Kathleen P; Marie Harvey, S; Turner Goins, R

    2017-12-01

    The need to scale-up effective arthritis self-management programs is pressing as the prevalence of arthritis increases. The CDC Arthritis Program funds state health departments to work with local delivery systems to embed arthritis programs into their day-to-day work. To encourage organizational ownership and sustainability of programs, funding is restricted to offset program start-up costs. The purpose of this study was to identify factors that impacted the success of implementing an evidence-based arthritis self-management program, funded by the CDC Arthritis Program, into the Oregon Extension Service. We interviewed staff and partners involved in implementation who had and had not successfully delivered Walk With Ease (N = 12) to identify barriers and facilitators to scaling-up. Document analysis of administrative records was used to triangulate and expand on findings. Delivery goals defined by the funder were not met in Year 1: only 3 of the expected 28 programs were delivered. Barriers to implementation included insufficient planning for implementation driven by pressure to deliver programs and insufficient resources to support staff time. Facilitators included centralized administration of key implementation activities and staffs' previous experience implementing new programs. The importance of planning and preparing for implementation cannot be overlooked. Funders, however, eager to see deliverables, continue to define implementation goals in terms of program reach, exclusive of capacity-building. Lack of capacity-building can jeopardize staff buy-in, implementation quality, and sustainability. Based on our findings coupled with support from implementation literature, we offer recommendations for future large-scale implementation efforts operating under such funding restrictions.

  10. Employee Perceptions of Their Organization's Level of Emergency Preparedness Following a Brief Workplace Emergency Planning Educational Presentation.

    PubMed

    Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C

    2016-06-01

    A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p < 0.05) higher perceptions of their organization's level of emergency preparedness than non-participants. It is recommended that an assessment of organizational preparedness level supplement emergency planning educational presentations in order to immediately apply the material covered and encourage employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.

  11. [Role of occupational rehabilitation therapy in returning to work: experimental experience].

    PubMed

    Bazzini, Giacomo; Panigazzil, Monica; Prestifilippo, Elena; Capodaglio, Edda Maria; Candura, Stefano M; Scafa, Fabrizio; Nuccio, Carla; Cortese, Giovanni; Matarrese, Maria Rosaria; Miccio, Antonella

    2014-01-01

    The experimental experience is the result of combining cultural, clinical and scientific interest in rehabilitative, occupational and forensic mnedicine and in ergonomics. It deals with the rehabilitation and return at work of patients with physical disabilities caused by occupational trauma or disease. The programme described starts with a selection by INAIL and involves with an outpatient surgery inclusion. It is composed of: preliminary physical examination, functional assessment, the formulation of a rehabilitation plan and its successive implementation. At the end of the evaluation plan, there is a final assessment to identify outcome indicators and residual functional and work capacity.

  12. Evaluation of the Healthy Lifestyles Initiative for Improving Community Capacity for Childhood Obesity Prevention.

    PubMed

    Berman, Marcie; Bozsik, Frances; Shook, Robin P; Meissen-Sebelius, Emily; Markenson, Deborah; Summar, Shelly; DeWit, Emily; Carlson, Jordan A

    2018-02-22

    Policy, systems, and environmental approaches are recommended for preventing childhood obesity. The objective of our study was to evaluate the Healthy Lifestyles Initiative, which aimed to strengthen community capacity for policy, systems, and environmental approaches to healthy eating and active living among children and families. The Healthy Lifestyles Initiative was developed through a collaborative process and facilitated by community organizers at a local children's hospital. The initiative supported 218 partners from 170 community organizations through training, action planning, coalition support, one-on-one support, and the dissemination of materials and sharing of resources. Eighty initiative partners completed a brief online survey on implementation strategies engaged in, materials used, and policy, systems, and environmental activities implemented. In accordance with frameworks for implementation science, we assessed associations among the constructs by using linear regression to identify whether and which of the implementation strategies were associated with materials used and implementation of policy, systems, and environmental activities targeted by the initiative. Each implementation strategy was engaged in by 30% to 35% of the 80 survey respondents. The most frequently used materials were educational handouts (76.3%) and posters (66.3%). The most frequently implemented activities were developing or continuing partnerships (57.5%) and reviewing organizational wellness policies (46.3%). Completing an action plan and the number of implementation strategies engaged in were positively associated with implementation of targeted activities (action plan, effect size = 0.82; number of strategies, effect size = 0.51) and materials use (action plan, effect size = 0.59; number of strategies, effect size = 0.52). Materials use was positively associated with implementation of targeted activities (effect size = 0.35). Community-capacity-building efforts can be effective in supporting community organizations to engage in policy, systems, and environmental activities for healthy eating and active living. Multiple implementation strategies are likely needed, particularly strategies that involve a high level of engagement, such as training community organizations and working with them on structured action plans.

  13. Integrated Planning for Telepresence with Time Delays

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Rabe, Kenneth J.

    2006-01-01

    Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.

  14. Employers Talk about Building a School-to-Work System: Voices from the Field.

    ERIC Educational Resources Information Center

    Wills, Joan L., Ed.

    This document contains background information on the school-to-work (STW) movement and 20 essays written by employers and intermediaries involved in STW program planning and implementation. Four points are highlighted: (1) it takes time to assemble an STW system; (2) the number of students participating in structured work-based learning remains…

  15. "I Know This Is Supposed to Be More Like the Real World, but . . .": Student Perceptions of a PBL Implementation in an Undergraduate Materials Science Course

    ERIC Educational Resources Information Center

    Henry, Holly R.; Tawfik, Andrew A.; Jonassen, David H.; Winholtz, Robert A.; Khanna, Sanjeev

    2012-01-01

    This qualitative case study examines the initial implementation of a problem-based version of an undergraduate course in materials science for the purpose of identifying areas of improvement to the curriculum prior to a planned second implementation. The course was designed around problems that students work in small teams to solve under the…

  16. Changing the Project Execution Culture at NASA Dryden

    NASA Technical Reports Server (NTRS)

    Horn, Thomas J.

    2012-01-01

    Dryden has embarked on implementing Critical Chain Project Management (CCPM) philosophies and tools to reduce workforce stress and increase the centers work throughput. This effort has been under way for over one year and represents a fundamental state change in how various projects are planned and executed at the center. The implementation of CCPM philosophies and the required cultural changes represent the most difficult aspects of the implementation.

  17. The provision of workplace accommodations following cancer: survivor, provider, and employer perspectives.

    PubMed

    Stergiou-Kita, Mary; Pritlove, Cheryl; van Eerd, Dwayne; Holness, Linn D; Kirsh, Bonnie; Duncan, Andrea; Jones, Jennifer

    2016-06-01

    With improvements in screening, diagnosis, and treatment, the number of persons surviving cancer and staying at or returning to work is increasing. While workplace accommodations optimize workers' abilities to participate in the workforce, there has been little in-depth investigation of the types of accommodations reported to have been provided to cancer survivors and the processes relevant to ensuring their successful implementation. We employed an exploratory qualitative method and conducted 40 semi-structured interviews with three groups: (i) cancers survivors (n = 16), (ii) health/vocational service providers (n = 16), and (iii) employer representatives (n = 8) to explore return to work and accommodation processes, successes, and challenges. An inductive thematic analysis approach was used to analyze the data. Four types of accommodations were recommended: (1) graduated return to work plans and flexible scheduling, (2) modification of work duties and performance expectations, (3) retraining and supports at the workplace, and (4) modification of the physical work environment and/or the provision of adaptive aids/technologies. Processes relevant to ensuring effective accommodations included: (1) developing knowledge about accommodations, (2) employer's ability to accommodate, (3) negotiating reasonable accommodations, (4) customizing accommodations, and (5) implementing and monitoring accommodation plans. Accommodation challenges included: (1) survivors' fears requesting accommodations, (2) developing clear and specific accommodations, (3) difficult to accommodate jobs, and (4) workplace challenges, including strained pre-cancer workplace relationships, insufficient/inflexible workplace policies, employer concerns regarding productivity and precedent setting, and limited modified duties. Accommodations need to be customized and clearly linked to survivors' specific job demands, work context, and available workplace supports. Survivors need to feel comfortable disclosing the need for accommodations. Ongoing communication and monitoring are required to ensure accommodations are implemented and changes made to the return to work plan as required. The provision of appropriate workplace accommodations can enhance survivors' abilities to stay or return to work.

  18. Albeni Falls Wildlife Mitigation : Annual Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terra-Berns, Mary

    The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less

  19. [General aspects of planning and care in mental health].

    PubMed

    Saforcada, E

    1976-09-01

    This paper reviews some general concepts on Planning, especially in public and welfare sectors, stressing those concerning the major flaws in the argentine system of mental health. The author considers the definition of planning levels, and sets forth three: general plan, program and project. The correlative implementation is also considered. The importance of feed-back from adequate evaluation is stressed, emphasizing three aspects: a) evaluation of dynamics, rate and extent of decrease, increase or stagnation; b) assessment of efficacity of factors involved; c) control and stabilization of goals already attained. The necessity to develop a human ecology, encompassing socio-cultural and psycho-social factors is stressed, together with fostering theoretical research and the use of its results by implementation agents. Several differences among prevailing mental health actions are pointed out which allow a distinction between two typical models: clinical and sanitarist. The main differences between them lye on: standard location of working sites, nature of basic actions, field of action, hypothesis for working, including ethiological and ecological assumptions, theoretical and methodological framework. A series of criteria for evaluating sanitary techniques and strategies are set forth, among which: operative procedures, length of treatments, degree of therapeutic concentration, and general pragmatic criteria. The indicators reviewed are: degree of efficacity, covering, degree of perseverance in treatments, cultural barriers between patient and therapist, delegation of functions into special, first-rate sanitary agents, needs for the training of mental health workers. An attempt is made at developping general evaluation criteria for mental health planning, and several indicators are proposed, among which: a) cost/efficacity ratio, including in costs the use of economical, human and physical resources; b) preventive capacities of the community; c) capacities for the community to generate new types of organization and social dynamics able to cope with increasing mental health demands; first-rate personnel and mental health agents performance and training; e) assessment of "distances" between theoretical planning and actual implementation outlines; f) requirements of time for the implementation of programs.

  20. Aligning everyday life priorities with people's self-management support networks: an exploration of the work and implementation of a needs-led telephone support system.

    PubMed

    Blickem, Christian; Kennedy, Anne; Jariwala, Praksha; Morris, Rebecca; Bowen, Robert; Vassilev, Ivaylo; Brooks, Helen; Blakeman, Tom; Rogers, Anne

    2014-06-17

    Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of 'health' in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. ISRCTN45433299.

  1. Social workers' involvement in advance care planning: a systematic narrative review.

    PubMed

    Wang, Chong-Wen; Chan, Cecilia L W; Chow, Amy Y M

    2017-07-10

    Advance care planning is a process of discussion that enables competent adults to express their wishes about end-of-life care through periods of decisional incapacity. Although a number of studies have documented social workers' attitudes toward, knowledge about, and involvement in advance care planning, the information is fragmented. The purpose of this review was to provide a narrative synthesis of evidence on social workers' perspectives and experiences regarding implementation of advance care planning. Six databases were searched for peer-reviewed research papers from their respective inception through December 2016. All of the resulting studies relevant to both advance care planning and social worker were examined. The findings of relevant studies were synthesized thematically. Thirty-one articles met the eligibility criteria. Six research themes were identified: social workers' attitudes toward advance care planning; social workers' knowledge, education and training regarding advance care planning; social workers' involvement in advance care planning; social workers' perceptions of their roles; ethical issues relevant to advance care planning; and the effect of social work intervention on advance care planning engagement. The findings suggest that there is a consensus among social workers that advance care planning is their duty and responsibility and that social workers play an important role in promoting and implementing advance care planning through an array of activities. This study provides useful knowledge for implementing advance care planning through illustrating social workers' perspectives and experiences. Further studies are warranted to understand the complexity inherent in social workers' involvement in advance care planning for different life-limiting illnesses or within different socio-cultural contexts.

  2. 78 FR 47259 - Approval and Promulgation of Implementation Plans; Washington: Thurston County Second 10-Year PM10

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... Washington State Department of Ecology (Ecology) regulatory changes that strengthen the control measures... Standard (NAAQS) on August 7, 1987 (52 FR 29383). Ecology and ORCAA worked with the communities of Lacey... requirements imposed by the 1990 CAA Amendments, Ecology submitted a supplement to the attainment plan in...

  3. Development of a Conference Planning Model Using Integrated Database, Word Processing, and Spreadsheet Software.

    ERIC Educational Resources Information Center

    Stevens, William E.

    This report presents a model for conducting a statewide conference for the approximately 900 members of the South Carolina Council of Teachers of Mathematics (SCCTM) using the AppleWorks integrated software as the basis of the implementation plan. The first and second chapters provide background information on the conference and the…

  4. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  5. Effectiveness of a participatory physical and psychosocial intervention to balance the demands and resources of industrial workers: A cluster-randomized controlled trial.

    PubMed

    Gupta, Nidhi; Wåhlin-Jacobsen, Christian Dyrlund; Abildgaard, Johan Simonsen; Henriksen, Louise Nøhr; Nielsen, Karina; Holtermann, Andreas

    2018-01-01

    Objectives The aim of this study was to evaluate the effectiveness of a participatory physical and psychosocial workplace intervention (known as PIPPI) on work ability and recovery among industrial workers. Methods Eligible workers were cluster-randomized into intervention (N=193) and control (N=222) groups. Intervention group members participated in three workshops where they mapped positive and negative aspects of their physical and psychosocial work environment and developed action plans addressing the highlighted issues, which were subsequently implemented by the participants. Questionnaire-based data on work ability and recovery were collected at baseline and 8-, 10- and 12-month follow-up. Data on productivity, well-being, mental health, and physical demands and resources were collected at baseline and 12-month follow-up. Results The intervention was delivered and received as planned (100% planned workshops conducted, 69% [standard deviation (SD) 7%] participation in workshops) and with a response rate of 76% (SD 8%) to the questionnaires. No significant between-group improvements for any of the outcomes were found in intention-to-treat multi-level mixed models. On the contrary, tendencies were observed for poorer recovery and reduced work ability in the intervention compared to control group. Conclusion The intervention did not improve the outcomes. This result can have several explanations, such as a regression-toward-the-mean effect or that the intervention might have put an additional burden on the workers already facing high work demands. In addition, there may have been an insufficient match between the intervention components implemented and the predetermined outcomes, and implementation may have been unsuccessful. These potential explanations need to be investigated using process evaluation data.

  6. SU-F-T-47: MRI T2 Exclusive Based Planning Using the Endocavitary/interstitial Gynecological Benidorm Applicator: A Proposed TPS Library and Preplan Efficient Methodology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Richart, J; Otal, A; Rodriguez, S

    Purpose: ABS and GEC-ESTRO have recommended MRI T2 for image guided brachytherapy. Recently, a new applicator (Benidorm Template, TB) has been developed in our Department (Rodriguez et al 2015). TB is fully MRI compatible because the Titanium needles and it allows the use of intrauterine tandem. Currently, TPS applicators library are not currently available for non-rigid applicators in case of interstitial component as the TB.The purpose of this work is to present the development of a library for the TB, together with its use on a pre-planning technique. Both new goals allow a very efficient and exclusive T2 MRI basedmore » planning clinical TB implementation. Methods: The developed library has been implemented in Oncentra Brachytherapy TPS, version 4.3.0 (Elekta) and now is being implemented on Sagiplan v 2.0 TPS (Eckert&Ziegler BEBIG). To model the TB, free and open software named FreeCAD and MeshLab have been used. The reconstruction process is based on three inserted A-vitamin pellets together with the data provided by the free length. The implemented preplanning procedure is as follow: 1) A MRI T2 acquisition is performed with the template in place just with the vaginal cylinder (no uterine tube nor needles). 2) The CTV is drawn and the required needles are selected using a developed Java based application and 3) A post-implant MRI T2 is performed. Results: This library procedure has been successfully applied by now in 25 patients. In this work the use of the developed library will be illustrated with clinical examples. The preplanning procedure has been applied by now in 6 patients, having significant advantages: needle depth estimation, needle positions and number are optimized a priori, time saving, etc Conclusion: TB library and pre-plan techniques are feasible and very efficient and their use will be illustrated in this work.« less

  7. 78 FR 17210 - Meetings of the National Biodefense Science Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-20

    ... Public Health and Healthcare Situational Awareness Strategy and Implementation Plan Working Group... the space available. Meeting rooms will accommodate up to 30 people. Pre-registration is required for...

  8. The TESSA OER Experience: Building Sustainable Models of Production and User Implementation

    ERIC Educational Resources Information Center

    Wolfenden, Freda

    2008-01-01

    This paper offers a review of the origins, design strategy and implementation plans of the Teacher Education in Sub-Saharan Africa (TESSA) research and development programme. The programme is working to develop new models of teacher education, particularly school based training, including the creation of a programme webspace and an extensive bank…

  9. The passage and initial implementation of Oregon's Measure 44

    PubMed Central

    Goldman, L.; Glantz, S.

    1999-01-01

    OBJECTIVE—To prepare a history of the passage and early implementation of Ballot Measure 44, "An Act to Support the Oregon Health Plan", and tobacco control policymaking in Oregon. Measure 44 raised cigarette taxes in Oregon by US$0.30 per pack, and dedicated 10% of the revenues to tobacco control.
METHODS—Data were gathered from interviews with members of the Committee to Support the Oregon Health Plan, Measure 44's campaign committee, as well as with state and local officials, and tobacco control advocates. Additional information was obtained from public documents, internal memoranda, and news reports.
RESULTS—Although the tobacco industry outspent Measure 44's supporters 7 to 1, the initiative passed with 56% of the vote. Even before the election, tobacco control advocates were working to develop an implementation plan for the tobacco control programme. They mounted a successful lobbying campaign to see that the legislature did not divert tobacco control funds to other uses. They also stopped industry efforts to limit the scope of the programme. The one shortcoming of the tobacco control forces was not getting involved in planning the initiative early enough to influence the amount of money that was devoted to tobacco control. Although public health groups provided 37% of the money it cost to pass Measure 44, only 10% of revenues were devoted to tobacco control.
CONCLUSIONS—Proactive planning and aggressive implementation can secure passage of tobacco control initiatives and see that the associated implementing legislation follows good public health practice.


Keywords: advocacy; legislation; implementation; tobacco tax PMID:10599577

  10. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  11. Disability Policy Implementation From a Cross-Cultural Perspective.

    PubMed

    Verdugo, Miguel A; Jenaro, Cristina; Calvo, Isabel; Navas, Patricia

    2017-07-01

    Implementation of disability policy is influenced by social, political, and cultural factors. Based on published work, this article discusses four guidelines considered critical for successful policy implementation from a cross-cultural perspective. These guidelines are to: (a) base policy implementation on a contextual analysis, (b) employ a value-based approach, (c) align the service delivery system both vertically and horizontally, and (d) engage in a partnership in policy implementation. Public policy should be understood from a systems perspective that includes cross-cultural issues, such as how different stakeholders are acting and the way they plan and implement policy.

  12. Dynamic interactions between visual working memory and saccade target selection

    PubMed Central

    Schneegans, Sebastian; Spencer, John P.; Schöner, Gregor; Hwang, Seongmin; Hollingworth, Andrew

    2014-01-01

    Recent psychophysical experiments have shown that working memory for visual surface features interacts with saccadic motor planning, even in tasks where the saccade target is unambiguously specified by spatial cues. Specifically, a match between a memorized color and the color of either the designated target or a distractor stimulus influences saccade target selection, saccade amplitudes, and latencies in a systematic fashion. To elucidate these effects, we present a dynamic neural field model in combination with new experimental data. The model captures the neural processes underlying visual perception, working memory, and saccade planning relevant to the psychophysical experiment. It consists of a low-level visual sensory representation that interacts with two separate pathways: a spatial pathway implementing spatial attention and saccade generation, and a surface feature pathway implementing color working memory and feature attention. Due to bidirectional coupling between visual working memory and feature attention in the model, the working memory content can indirectly exert an effect on perceptual processing in the low-level sensory representation. This in turn biases saccadic movement planning in the spatial pathway, allowing the model to quantitatively reproduce the observed interaction effects. The continuous coupling between representations in the model also implies that modulation should be bidirectional, and model simulations provide specific predictions for complementary effects of saccade target selection on visual working memory. These predictions were empirically confirmed in a new experiment: Memory for a sample color was biased toward the color of a task-irrelevant saccade target object, demonstrating the bidirectional coupling between visual working memory and perceptual processing. PMID:25228628

  13. Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DosSantos, Joe; Vashro, Jim; Lockard, Larry

    1994-06-01

    In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull troutmore » redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.« less

  14. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    NASA Astrophysics Data System (ADS)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  15. Performance Analysis: Work Control Events Identified January - August 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Grange, C E; Freeman, J W; Kerr, C E

    2011-01-14

    This performance analysis evaluated 24 events that occurred at LLNL from January through August 2010. The analysis identified areas of potential work control process and/or implementation weaknesses and several common underlying causes. Human performance improvement and safety culture factors were part of the causal analysis of each event and were analyzed. The collective significance of all events in 2010, as measured by the occurrence reporting significance category and by the proportion of events that have been reported to the DOE ORPS under the ''management concerns'' reporting criteria, does not appear to have increased in 2010. The frequency of reporting inmore » each of the significance categories has not changed in 2010 compared to the previous four years. There is no change indicating a trend in the significance category and there has been no increase in the proportion of occurrences reported in the higher significance category. Also, the frequency of events, 42 events reported through August 2010, is not greater than in previous years and is below the average of 63 occurrences per year at LLNL since 2006. Over the previous four years, an average of 43% of the LLNL's reported occurrences have been reported as either ''management concerns'' or ''near misses.'' In 2010, 29% of the occurrences have been reported as ''management concerns'' or ''near misses.'' This rate indicates that LLNL is now reporting fewer ''management concern'' and ''near miss'' occurrences compared to the previous four years. From 2008 to the present, LLNL senior management has undertaken a series of initiatives to strengthen the work planning and control system with the primary objective to improve worker safety. In 2008, the LLNL Deputy Director established the Work Control Integrated Project Team to develop the core requirements and graded elements of an institutional work planning and control system. By the end of that year this system was documented and implementation had begun. In 2009, training of the workforce began and as of the time of this report more than 50% of authorized Integration Work Sheets (IWS) use the activity-based planning process. In 2010, LSO independently reviewed the work planning and control process and confirmed to the Laboratory that the Integrated Safety Management (ISM) System was implemented. LLNL conducted a cross-directorate management self-assessment of work planning and control and is developing actions to respond to the issues identified. Ongoing efforts to strengthen the work planning and control process and to improve the quality of LLNL work packages are in progress: completion of remaining actions in response to the 2009 DOE Office of Health, Safety, and Security (HSS) evaluation of LLNL's ISM System; scheduling more than 14 work planning and control self-assessments in FY11; continuing to align subcontractor work control with the Institutional work planning and control system; and continuing to maintain the electronic IWS application. The 24 events included in this analysis were caused by errors in the first four of the five ISMS functions. The most frequent cause was errors in analyzing the hazards (Function 2). The second most frequent cause was errors occurring when defining the work (Function 1), followed by errors during the performance of work (Function 4). Interestingly, very few errors in developing controls (Function 3) resulted in events. This leads one to conclude that if improvements are made to defining the scope of work and analyzing the potential hazards, LLNL may reduce the frequency or severity of events. Analysis of the 24 events resulted in the identification of ten common causes. Some events had multiple causes, resulting in the mention of 39 causes being identified for the 24 events. The most frequent cause was workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete. The second most frequent cause was unclear, incomplete or confusing documents directing the work. Together, these two causes were mentioned 17 times and contributed to 13 of the events. All of the events with the cause of ''workers, supervisors, or experts believing they understood the work and the hazards but their understanding was incomplete'' had this error in the first two ISMS functions: define the work and analyze the hazard. This means that these causes result in the scope of work being ill-defined or the hazard(s) improperly analyzed. Incomplete implementation of these functional steps leads to the hazards not being controlled. The causes are then manifested in events when the work is conducted. The process to operate safely relies on accurately defining the scope of work. This review has identified a number of examples of latent organizational weakness in the execution of work control processes.« less

  16. Farmers knew prosperity lies in family planning: Prof. Gao Yuanxiang.

    PubMed

    1997-09-01

    This brief article summarizes a speech given by the Director of Population Studies in Hebei, China, on family planning and sustainable development. Concurrent with the implementation of the family planning policy over the past 20 years was the implementation of development policies in rural areas. Agricultural policy shifted from support of the commune system to a land-leasing system. The land-leasing system is an improvement that inspires farmers to become wealthy and modernized. The new rural administration encourages modernization that releases manpower, and thus, frees farmers to concentrate on improving production and farming techniques rather than on increasing reproduction. Farmers decide on working time allocation and investment. Surplus agricultural laborers are migrating to cities in search of better work opportunities. Legal measures are needed to help migrants adapt to development. Urban living requires a one-child policy, while a two-child policy is acceptable in poor and mountainous rural areas. "The education of family planning must be mandatory." Under the new policies, people must become committed to family planning. Farmers are beginning to discover the benefits of family planning. Farmer's enlightenment occurred as a result of the family planning and poverty alleviation efforts during the late 1980s and 1990s. Farmers appreciate the government assistance and now believe that family planning benefits individuals and enhances their honor and responsibility. The benefits of the policy will continue into the future. "Sustainable population development is an important part of economic development." China is entering the new century with a new type of demographic structure, a new cultural system of family planning, and practical efforts.

  17. The pediatrician's role in development and implementation of an Individual Education Plan (IEP) and/or an Individual Family Service Plan (IFSP). American Academy of Pediatrics. Committee on Children with Disabilities.

    PubMed

    1999-07-01

    The Individual Education Plan and Individual Family Service Plan are legally mandated documents developed by a multidisciplinary team assessment that specifies goals and services for each child eligible for special educational services or early intervention services. Pediatricians need to be knowledgeable of federal, state, and local requirements; establish linkages with early intervention, educational professionals, and parent support groups; and collaborate with the team working with individual children.

  18. The potential contribution of the Queensland wet tropics region natural resource plan to river improvement and water quality.

    PubMed

    McDonald, G; Weston, N; Dorrington, B

    2003-01-01

    This paper reports on work in progress on the new Wet Tropics Regional Natural Resource Management Plan and its potential to deliver river management and water quality outcomes. The plan is being prepared in accordance with the guidelines of the Nation Action Plan for Salinity and Water Quality/Natural Heritage Trust (NAP/NHT2). In particular the paper discusses the technical basis for priorities, target setting and implementation and the most effective instruments for achieving river improvement and water quality outcomes in the region.

  19. Implementation Plan for Flexible Automation in U.S. Shipyards

    DTIC Science & Technology

    1985-01-01

    process steps, cramped work sites, interrupted geometries , irregular or novel shapes, and other factors that affect automatability. We also try to...held by 2 hands in awkward places. Interrupt geometry of plates and beams. Cannot predict outcome. Creates need to measure and recut. Automation, if...of standard. enough over time I every job. I Rearrange work.Redefine work units. Too many interruptions Time, space, geometry only a little work gets

  20. The Planning of In-Service Workshops: A Seminar (Atlanta, Feb. 14-17, 1971).

    ERIC Educational Resources Information Center

    Southern Regional Education Board, Atlanta, GA.

    This document is a summation of a workshop designed to be a planning experience for ABE training personnel. It also contains a sampling of model training designs developed by the participants for inservice work. The object of the seminar was to provide an overview of relevant techniques and procedures for developing and implementing short-term…

  1. Lessons learned about collaborative evaluation using the Capacity for Applying Project Evaluation (CAPE) framework with school and district leaders.

    PubMed

    Corn, Jenifer O; Byrom, Elizabeth; Knestis, Kirk; Matzen, Nita; Thrift, Beth

    2012-11-01

    Schools, districts, and state-level educational organizations are experiencing a great shift in the way they do the business of education. This shift focuses on accountability, specifically through the expectation of the effective utilization of evaluative-focused efforts to guide and support decisions about educational program implementation. In as much, education leaders need specific guidance and training on how to plan, implement, and use evaluation to critically examine district and school-level initiatives. One specific effort intended to address this need is through the Capacity for Applying Project Evaluation (CAPE) framework. The CAPE framework is composed of three crucial components: a collection of evaluation resources; a professional development model; and a conceptual framework that guides the work to support evaluation planning and implementation in schools and districts. School and district teams serve as active participants in the professional development and ultimately as formative evaluators of their own school or district-level programs by working collaboratively with evaluation experts. The CAPE framework involves the school and district staff in planning and implementing their evaluation. They are the ones deciding what evaluation questions to ask, which instruments to use, what data to collect, and how and to whom results should be reported. Initially this work is done through careful scaffolding by evaluation experts, where supports are slowly pulled away as the educators gain experience and confidence in their knowledge and skills as evaluators. Since CAPE engages all stakeholders in all stages of the evaluation, the philosophical intentions of these efforts to build capacity for formative evaluation strictly aligns with the collaborative evaluation approach. Copyright © 2012 Elsevier Ltd. All rights reserved.

  2. Vapor Intrusion Characterization Report (Revision 1.0)

    EPA Pesticide Factsheets

    Vapor Intrusion Characterization Report (Revision 1) - February 5, 2015: This report, which was approved by the EPA on February 18, 2015, documents the results from implementation of the Final Vapor Intrusion Characterization Work Plan.

  3. VTrans climate change action plan

    DOT National Transportation Integrated Search

    2008-06-01

    VTrans is working closely with other state agencies, including the Agency of Natural Resources (ANR) to review and implement the transportation-related recommendations from the 2007 Governors Commission on Climate Change (GCCC) final report. The r...

  4. Nine steps towards a better water meter management.

    PubMed

    Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R

    2012-01-01

    The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.

  5. Incorporating natural hazard assessments into municipal master-plans; case-studies from Israel

    NASA Astrophysics Data System (ADS)

    Katz, Oded

    2010-05-01

    The active Dead Sea Rift (DSR) runs along the length of Israel, making the entire state susceptible to earthquake-related hazards. Current building codes generally acknowledge seismic hazards and direct engineers towards earthquake-resistant structures. However, hazard mapping on a scale fit for municipal/governmental planning is subject to local initiative and is currently not mandatory as seems necessary. In the following, a few cases of seismic-hazard evaluation made by the Geological Survey of Israel are presented, emphasizing the reasons for their initiation and the way results were incorporated (or not). The first case is a seismic hazard qualitative micro-zonation invited by the municipality of Jerusalem as part of a new master plan. This work resulted in maps (1:50,000; GIS format) identifying areas prone to (1) amplification of seismic shaking due to site characteristics (outcrops of soft rocks or steep topography) and (2) sites with earthquake induced landslide (EILS) hazard. Results were validated using reports from the 1927, M=6.2 earthquake that originated along the DSR about 30km east of Jerusalem. Although the hazard maps were accepted by municipal authorities, practical use by geotechnical engineers working within the frame of the new master-plan was not significant. The main reason for that is apparently a difference of opinion between the city-engineers responsible for implementing the new master-plan and the geologists responsible of the hazard evaluation. The second case involves evaluation of EILS hazard for two towns located further north along the DSR, Zefat and Tiberias. Both were heavily damaged more than once by strong earthquakes in past centuries. Work was carried out as part of a governmental seismic-hazard reduction program. The results include maps (1:10,000 scales) of sites with high EILS hazard identified within city limits. Maps (in GIS format) were sent to city engineers with reports explaining the methods and results. As far as we know, widespread implementation of the maps within municipal master plans never came about, and there was no open discussion between city engineers and the Geological Survey. The main reasons apparently are (1) a lack, until recently, of mandatory building codes requiring incorporation of EILS hazard; (2) budget priorities; (3) failure to involve municipality personnel in planning and executing the EILS hazard evaluation. These cases demonstrate that for seismic hazard data to be incorporated and implemented within municipal master-plans there needs to be (1) active involvement of municipal officials and engineers from the early planning stages of the evaluation campaign, and (2) a-priori dedication of funds towards implementation of evaluation results.

  6. Job sharing in clinical nutrition management: a plan for successful implementation.

    PubMed

    Visocan, B J; Herold, L S; Mulcahy, M J; Schlosser, M F

    1993-10-01

    While women continue to enter the American work force in record numbers; many experience difficulty in juggling career and family obligations. Flexible scheduling is one option used to ease work and family pressures. Women's changing work roles have potentially noteworthy implications for clinical nutrition management, a traditionally female-dominated profession where the recruitment and retention of valued, experienced registered dietitians can prove to be a human resources challenge. Job sharing, one type of flexible scheduling, is applicable to the nutrition management arena. This article describes and offers a plan for overcoming obstacles to job sharing, including determining feasibility, gaining support of top management, establishing program design, announcing the job share program, and using implementation, monitoring, and fine-tuning strategies. Benefits that can be derived from a successful job share are reduced absenteeism, decreased turnover, enhanced recruitment, improved morale, increased productivity, improved job coverage, and enhanced skills and knowledge base. A case study illustrates one method for achieving job sharing success in clinical nutrition management.

  7. Final Technical Report on the Institute for Advanced Study in Student Personnel Work.

    ERIC Educational Resources Information Center

    Callis, Robert

    This document reports the planning, implementation, and evaluation of a 9-month institute held at the University of Missouri-Columbia to prepare participants (approximately 20) for leadership positions in student personnel work at junior colleges and technical institutes. The following aspects of the instructional program are discussed and…

  8. Planning the Journey to Best Practice in Developing Employability Skills: Transnational University Internships in Vietnam

    ERIC Educational Resources Information Center

    Bilsland, Christine; Nagy, Helga; Smith, Phil

    2014-01-01

    Currently, there is little research into how Western universities can establish and implement effective WIL (Work Integrated Learning) in their offshore campuses. Given global concern with university graduates' general work-readiness, combined with a need for foreign universities to deliver relevant outcomes to its offshore students, greater…

  9. Women and the World of Work.

    ERIC Educational Resources Information Center

    Tobin, Nancy; Wilson, Barbara Lazarus

    One of the products developed by the Home and Community-Based Career Education Project, the booklet focuses on the concerns of women who want or need to begin or resume a career. It describes today's working woman, examines her options, and presents practical suggestions for overcoming obstacles in planning for and implementing career decisions.…

  10. A Framework for Teaching Practice-Based Research with a Focus on Service Users

    ERIC Educational Resources Information Center

    Austin, Michael J.; Isokuortti, Nanne

    2016-01-01

    The integration of research and practice in social work education and agency practice is both complex and challenging. The analysis presented here builds upon the classic social work generalist framework (engagement, assessment, service planning and implementation, service evaluation, and termination) by developing a three-part framework to…

  11. 29 CFR Appendix E to Subpart M of... - Sample Fall Protection Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... through holes and openings in walking/working surfaces. Each employee will be trained in these procedures..., implemented, monitored and enforced by any one individual. The total objective of a safe, accident free work environment can only be accomplished by a dedicated, concerted effort by every individual involved with the...

  12. The strategic plan of the American Fisheries Society

    USGS Publications Warehouse

    Johnson, B.L.; Irwin, E.R.; Landolt, M.L.; Loefflad, M.; Marsh, J.; Marshall, T.R.; Olmsted, L.L.; Pajak, P.; Peterson, S.; Webster, J.

    1994-01-01

    In August 1994, at its annual meeting in Halifax, Nova Scotia, the Executive Committee of the American Fisheries Society (AFS) approved a new Strategic Plan. The plan sets out eight goals that define a vision of AFS in the year 2001, and provides strategies to achieve each goal. Accomplishing the plan should position AFS to be more responsive to member needs and more effective at meeting the challenges facing the resource and profession under future expected conditions. The plan provides opportunities for every member to help shape AFS for the 21st century. In this paper, we describe the process of strategic planning, the goals and strategies of the AFS Strategic Plan, and how the plan is implemented through AFS annual work plans.

  13. Total Quality Management Implementation Plan Defense Depot Memphis

    DTIC Science & Technology

    1989-07-01

    W.ungilon. 0 t :0.O. )RT DATE 3. REPORT TYPE AND DATES COVERED I July 1989 _ 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Total Quality Management Implementation...improvement goals, implementation strategy and milestones. 6’ SEP 291989 /; ELECTE i= E 14. SUBJECT TERMS 15. NUMBER OF PAGES TQM (Total Quality Management ), Depot...changing work environment where change is the norm. We are talking about changes in attitudes and habits. Total Quality Management is not a panacea

  14. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  15. Using segmented regression analysis of interrupted time series data to assess colonoscopy quality outcomes of a web-enhanced implementation toolkit to support evidence-based practices for bowel preparation: a study protocol.

    PubMed

    Ramsey, Alex T; Maki, Julia; Prusaczyk, Beth; Yan, Yan; Wang, Jean; Lobb, Rebecca

    2015-06-07

    While there is convincing evidence on interventions to improve bowel preparation for patients, the evidence on how to implement these evidence-based practices (EBPs) in outpatient colonoscopy settings is less certain. The Strategies to Improve Colonoscopy (STIC) study compares the effect of two implementation strategies, physician education alone versus physician education plus an implementation toolkit for staff, on adoption of three EBPs (split-dosing of bowel preparation, low-literacy education, teach-back) to improve pre-procedure and intra-procedure quality measures. The implementation toolkit contains a staff education module, website containing tools to support staff in delivering EBPs, tailored patient education materials, and brief consultation with staff to determine how the EBPs can be integrated into the existing workflow. Given adaptations to the implementation plan and intentional flexibility in the delivery of the EBPs, we utilize a pragmatic study to balance external validity with demonstrating effectiveness of the implementation strategies. Participants will include all outpatient colonoscopy physicians, staff, and patients from a convenience sample of six endoscopy settings. Aim #1 will explore the relative effect of two strategies to implement patient-level EBPs on adoption and clinical quality outcomes. We will assess the change in level and trends of clinical quality outcomes (i.e., adequacy of bowel preparation, adenoma detection) using segmented regression analysis of interrupted time series data with two groups (intervention and delayed start). Aim #2 will examine the influence of organizational readiness to change on EBP implementation. We use a PRECIS diagram to reflect the extent to which each indicator of the study was pragmatic versus explanatory, revealing a largely pragmatic study. Implementation challenges have already motivated several adaptations to the original plan, reflecting the nature of implementation in real-world healthcare settings. The pragmatic study responds to the evolving needs of its healthcare partners and allows for flexibility in intervention delivery, thereby informing clinical decision-making in real-world settings. The current study will provide information about what works (intervention effectiveness), for whom it works (influence of Medicaid versus other insurance), in which contexts it works (setting characteristics that influence implementation), and how it works best (comparison of implementation strategies).

  16. 78 FR 28776 - Approval and Promulgation of Implementation Plans; Georgia; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...

  17. IDEA: Planning at the Core of Autonomous Reactive Agents

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Dorais, Gregory A.; Fry, Chuck; Levinson, Richard; Plaunt, Christian; Clancy, Daniel (Technical Monitor)

    2002-01-01

    Several successful autonomous systems are separated into technologically diverse functional layers operating at different levels of abstraction. This diversity makes them difficult to implement and validate. In this paper, we present IDEA (Intelligent Distributed Execution Architecture), a unified planning and execution framework. In IDEA a layered system can be implemented as separate agents, one per layer, each representing its interactions with the world in a model. At all levels, the model representation primitives and their semantics is the same. Moreover, each agent relies on a single model, plan database, plan runner and on a variety of planners, both reactive and deliberative. The framework allows the specification of agents that operate, within a guaranteed reaction time and supports flexible specification of reactive vs. deliberative agent behavior. Within the IDEA framework we are working to fully duplicate the functionalities of the DS1 Remote Agent and extend it to domains of higher complexity than autonomous spacecraft control.

  18. 33 CFR 236.6 - Other agencies EQ measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ENVIRONMENTAL QUALITY § 236.6 Other agencies EQ measures. The selected plan may include EQ measures not proposed..., implementation of such measures will not be required as local cooperation for the works proposed for Corps...

  19. How well has land-use planning worked under different governance regimes? A case study in the Portland, OR-Vancouver, WA metropolitan area, USA

    Treesearch

    Jeffrey D. Kline; Paul Thiers; Connie P. Ozawa; J. Alan Yeakley; Sean N. Gordon

    2014-01-01

    We examine land use planning outcomes over a 30-year period in the Portland, OR-Vancouver, WA (USA) metropolitan area. The four-county study region enables comparisons between three Oregon counties subject to Oregon’s 1973 Land Use Act (Senate Bill 100) and Clark County, WA which implemented land use planning under Washington’s 1990 Growth Management Act. We describe...

  20. Computerized physician order entry from a chief information officer perspective.

    PubMed

    Cotter, Carole M

    2004-12-01

    Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.

  1. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    USGS Publications Warehouse

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality-assurance plan does not describe detailed technical activities that are commonly termed "quality-control procedures." Instead, it focuses on current policies, operations, and responsibilities that are implemented at the management level. Contents of the plan will be reviewed annually and updated as programs and operations change.

  2. Evaluation of the Healthy Lifestyles Initiative for Improving Community Capacity for Childhood Obesity Prevention

    PubMed Central

    Berman, Marcie; Bozsik, Frances; Shook, Robin P.; Meissen-Sebelius, Emily; Markenson, Deborah; Summar, Shelly; DeWit, Emily

    2018-01-01

    Purpose and Objectives Policy, systems, and environmental approaches are recommended for preventing childhood obesity. The objective of our study was to evaluate the Healthy Lifestyles Initiative, which aimed to strengthen community capacity for policy, systems, and environmental approaches to healthy eating and active living among children and families. Intervention Approach The Healthy Lifestyles Initiative was developed through a collaborative process and facilitated by community organizers at a local children’s hospital. The initiative supported 218 partners from 170 community organizations through training, action planning, coalition support, one-on-one support, and the dissemination of materials and sharing of resources. Evaluation Methods Eighty initiative partners completed a brief online survey on implementation strategies engaged in, materials used, and policy, systems, and environmental activities implemented. In accordance with frameworks for implementation science, we assessed associations among the constructs by using linear regression to identify whether and which of the implementation strategies were associated with materials used and implementation of policy, systems, and environmental activities targeted by the initiative. Results Each implementation strategy was engaged in by 30% to 35% of the 80 survey respondents. The most frequently used materials were educational handouts (76.3%) and posters (66.3%). The most frequently implemented activities were developing or continuing partnerships (57.5%) and reviewing organizational wellness policies (46.3%). Completing an action plan and the number of implementation strategies engaged in were positively associated with implementation of targeted activities (action plan, effect size = 0.82; number of strategies, effect size = 0.51) and materials use (action plan, effect size = 0.59; number of strategies, effect size = 0.52). Materials use was positively associated with implementation of targeted activities (effect size = 0.35). Implications for Public Health Community-capacity–building efforts can be effective in supporting community organizations to engage in policy, systems, and environmental activities for healthy eating and active living. Multiple implementation strategies are likely needed, particularly strategies that involve a high level of engagement, such as training community organizations and working with them on structured action plans. PMID:29470168

  3. Toward implementation of a national ground water monitoring network

    USGS Publications Warehouse

    Schreiber, Robert P.; Cunningham, William L.; Copeland, Rick; Frederick, Kevin D.

    2008-01-01

    The Federal Advisory Committee on Water Information's (ACWI) Subcommittee on Ground Water (SOGW) has been working steadily to develop and encourage implementation of a nationwide, long-term ground-water quantity and quality monitoring framework. Significant progress includes the planned submission this fall of a draft framework document to the full committee. The document will include recommendations for implementation of the network and continued acknowledgment at the federal and state level of ACWI's potential role in national monitoring toward an improved assessment of the nation's water reserves. The SOGW mission includes addressing several issues regarding network design, as well as developing plans for concept testing, evaluation of costs and benefits, and encouraging the movement from pilot-test results to full-scale implementation within a reasonable time period. With the recent attention to water resource sustainability driven by severe droughts, concerns over global warming effects, and persistent water supply problems, the SOGW mission is now even more critical.

  4. KSC management training system project

    NASA Technical Reports Server (NTRS)

    Sepulveda, Jose A.

    1993-01-01

    The stated objectives for the summer of 1993 were: to review the Individual Development Plan Surveys for 1994 in order to automate the analysis of the Needs Assessment effort; and to develop and implement evaluation methodologies to perform ongoing program-wide course-to-course assessment. This includes the following: to propose a methodology to develop and implement objective, performance-based assessment instruments for each training effort; to mechanize course evaluation forms and develop software to facilitate the data gathering, analysis, and reporting processes; and to implement the methodology, forms, and software in at lease one training course or seminar selected among those normally offered in the summer at KSC. Section two of this report addresses the work done in regard to the Individual Development Plan Surveys for 1994. Section three presents the methodology proposed to develop and implement objective, performance-based assessment instruments for each training course offered at KSC.

  5. Evaluation of the implementation of a whole-workplace walking programme using the RE-AIM framework.

    PubMed

    Adams, Emma J; Chalkley, Anna E; Esliger, Dale W; Sherar, Lauren B

    2017-05-18

    Promoting walking for the journey to/from work and during the working day is one potential approach to increase physical activity in adults. Walking Works was a practice-led, whole-workplace walking programme delivered by employees (walking champions). This study aimed to evaluate the implementation of Walking Works using the RE-AIM framework and provide recommendations for future delivery of whole-workplace walking programmes. Two cross sectional surveys were conducted; 1544 (28%) employees completed the baseline survey and 918 employees (21%) completed the follow-up survey. Effectiveness was assessed using baseline and follow-up data; reach, implementation and maintenance were assessed using follow-up data only. For categorical data, Chi square tests were conducted to assess differences between surveys or groups. Continuous data were analysed to test for significant differences using a Mann-Whitney U test. Telephone interviews were conducted with the lead organisation co-ordinator, eight walking champions and three business representatives at follow-up. Interviews were transcribed verbatim and analysed to identify key themes related to adoption, implementation and maintenance. Adoption: Five workplaces participated in Walking Works. Reach: 480 (52.3%) employees were aware of activities and 221 (24.1%) participated. A variety of walking activities were delivered. Some programme components were not delivered as planned which was partly due to barriers in using walking champions to deliver activities. These included the walking champions' capacity, skills, support needs, ability to engage senior management, and the number and type of activities they could deliver. Other barriers included lack of management support, difficulties communicating information about activities and challenges embedding the programme into normal business activities. Effectiveness: No significant changes in walking to/from work or walking during the working day were observed. Maintenance: Plans to continue activities were mainly dependent on identifying continued funding. RE-AIM provided a useful framework for evaluating Walking Works. No changes in walking behaviour were observed. This may have been due to barriers in using walking champions to deliver activities, programme components not being delivered as intended, the types of activities delivered, or lack of awareness and participation by employees. Recommendations are provided for researchers and practitioners implementing future whole-workplace walking programmes.

  6. Site support program plan for ICF Kaiser Hanford Company, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    This document is the general administrative plan implemented by the Hanford Site contractor, ICF Kaiser Hanford Company. It describes the mission, administrative structure, projected staffing, to be provided by the contractor. The report breaks out the work responsibilities within the different units of the company, a baseline schedule for the different groups, and a cost summary for the different operating units.

  7. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  8. Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moe, Wayne; Honma, George

    This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less

  9. Data categories for marine planning

    USGS Publications Warehouse

    Lightsom, Frances L.; Cicchetti, Giancarlo; Wahle, Charles M.

    2015-01-01

    The U.S. National Ocean Policy calls for a science- and ecosystem-based approach to comprehensive planning and management of human activities and their impacts on America’s oceans. The Ocean Community in Data.gov is an outcome of 2010–2011 work by an interagency working group charged with designing a national information management system to support ocean planning. Within the working group, a smaller team developed a list of the data categories specifically relevant to marine planning. This set of categories is an important consensus statement of the breadth of information types required for ocean planning from a national, multidisciplinary perspective. Although the categories were described in a working document in 2011, they have not yet been fully implemented explicitly in online services or geospatial metadata, in part because authoritative definitions were not created formally. This document describes the purpose of the data categories, provides definitions, and identifies relations among the categories and between the categories and external standards. It is intended to be used by ocean data providers, managers, and users in order to provide a transparent and consistent framework for organizing and describing complex information about marine ecosystems and their connections to humans.

  10. Integrating health-related quality of life into cross-national clinical trials.

    PubMed

    Cella, D F; Wiklund, I; Shumaker, S A; Aaronson, N K

    1993-12-01

    When planning to implement health-related quality of life (HRQL) assessment in a multinational clinical trial, there are at least four general considerations: the natural history of the disease or condition, the characteristics of the population, the treatment under consideration, and the structure and function of the clinical trial organization. Each of these considerations must be addressed simultaneously when planning, implementing and analysing a cross-national clinical trial. There are five relevant polar components of the natural history of a given disease or condition: (1) time frame (acute versus chronic); (2) life threat (yes versus no); (3) symptomatology (present versus absent); (4) symptom expression (episodic versus constant); and (5) functional impact (present versus absent). Differences in population characteristics, (e.g., age, conditions, co-morbidity), embedded within any cross-national trial, must be addressed conceptually prior to initiating the trial, methodologically when planning implementation, and statistically after the collection of the data. In terms of treatment, issues such as adverse and positive effects and timing of effects must be considered. The methods entailed in planning, implementing and analysing HRQL data will depend upon the degree of centralization of personnel and resources within any given clinical trial. The range of possibilities runs from complete centralization, in which all planning and coordination of data collection and transmittal is done by one office, to complete decentralization, in which the work is distributed to participating sites and interested investigators. Finally, successful implementation of HRQL data collection is enhanced by heightening awareness of the importance of, and value in, assessing HRQL in clinical trials.(ABSTRACT TRUNCATED AT 250 WORDS)

  11. Pilot Testing of the EIT-4-BPSD Intervention.

    PubMed

    Resnick, Barbara; Kolanowski, Ann; Van Haitsma, Kimberly; Boltz, Marie; Galik, Elizabeth; Bonner, Alice; Vigne, Erin; Holtzman, Lauren; Mulhall, Paula M

    2016-11-01

    Behavioral and psychological symptoms of dementia are common in nursing home residents, and the Centers for Medicare and Medicaid Services now require that nonpharmacological interventions be used as a first-line treatment. Few staff know how to implement these interventions. The purpose of this study was to pilot test an implementation strategy, Evidence Integration Triangle for Behavioral and Psychological Symptoms of Dementia (EIT-4-BPSD), which was developed to help staff integrate behavioral interventions into routine care. The EIT-4-BPSD was implemented in 2 nursing homes, and 21 residents were recruited. A research nurse facilitator worked with facility champions and a stakeholder team to implement the 4 steps of EIT-4-BPSD. There was evidence of reach to all staff; effectiveness with improvement in residents' quality of life and a decrease in agitation; adoption based on the environment, policy, and care plan changes; and implementation and plans for maintenance beyond the 6-month intervention period. © The Author(s) 2016.

  12. Application of demographic analysis to pedestrian safety : [project summary].

    DOT National Transportation Integrated Search

    2017-05-01

    FDOT has been working diligently to improve its facilities for pedestrians and cyclists, including : initiatives like the Complete Streets Policy and Implementation Plan. However, one of the : challenges facing FDOT is targeting those areas of greate...

  13. Oregon Department of Transportation research leader : fall 2008.

    DOT National Transportation Integrated Search

    2008-01-01

    The newsletter includes: : 1) To ensure safe travel through construction work zones, Traffic Control Plans (TCPs) are developed to communicate required traffic control measures to the construction team. The quality of the design and implementation of...

  14. Data needs for tree removal crash modification factors on Arizona state highways.

    DOT National Transportation Integrated Search

    2016-07-01

    The Arizona Department of Transportation (ADOT) Roadway Departure Safety Implementation Plan (RDSIP) has : identified tree removal as a feasible countermeasure to reduce roadway departure crash frequency or severity. : Previous ADOT work has identifi...

  15. Framework for Quality Professional Development for Practitioners Working with Adult English Language Learners. Revised

    ERIC Educational Resources Information Center

    Center for Adult English Language Acquisition, 2010

    2010-01-01

    The Center for Adult English Language Acquisition (CAELA) Network, under contract with the Office of Vocational and Adult Education (OVAE), has created a framework that can be used to plan, implement, and evaluate professional development for practitioners working with adult English language learners at the state, regional, and program levels. The…

  16. The Development and Implementation of a School-to-Work Apprenticeship Model at a Technical Career Center.

    ERIC Educational Resources Information Center

    Kraft, James A.

    A business and education partnership model addressed a shortage of local, qualified, entry-level, technically skilled workers through a school-to-work apprenticeship program at the North Montco Technical Career Center in Lansdale, Pennsylvania. The research-based solution plan of the Pennsylvania Youth Apprenticeship Program (PYAP) included three…

  17. Career Exploration and Specialization: A New Training Design for Adult and Youth Work Experience. Concept Paper [and Synopsis].

    ERIC Educational Resources Information Center

    Spann, Jerry

    To address the Comprehensive Employment and Training Act (CETA) client's need for career development experience and skills, the Affirmative Action Office of Dane County (Wisconsin) and the Adult Work Experience Program (AWEP) staff plan to implement a year-long training program aimed at job exploration, internship, and personalized decision…

  18. The management of large cabling campaigns during the Long Shutdown 1 of LHC

    NASA Astrophysics Data System (ADS)

    Meroli, S.; Machado, S.; Formenti, F.; Frans, M.; Guillaume, J. C.; Ricci, D.

    2014-03-01

    The Large Hadron Collider at CERN entered into its first 18 month-long shutdown period in February 2013. During this period the entire CERN accelerator complex will undergo major consolidation and upgrade works, preparing the machines for LHC operation at nominal energy (7 TeV/beam). One of the most challenging activities concerns the cabling infrastructure (copper and optical fibre cables) serving the CERN data acquisition, networking and control systems. About 1000 kilometres of cables, distributed in different machine areas, will be installed, representing an investment of about 15 MCHF. This implies an extraordinary challenge in terms of project management, including resource and activity planning, work execution and quality control. The preparation phase of this project started well before its implementation, by defining technical solutions and setting financial plans for staff recruitment and material supply. Enhanced task coordination was further implemented by deploying selected competences to form a central support team.

  19. Aligning everyday life priorities with people’s self-management support networks: an exploration of the work and implementation of a needs-led telephone support system

    PubMed Central

    2014-01-01

    Background Recent initiatives to target the personal, social and clinical needs of people with long-term health conditions have had limited impact within primary care. Evidence of the importance of social networks to support people with long-term conditions points to the need for self-management approaches which align personal circumstances with valued activities. The Patient-Led Assessment for Network Support (PLANS) intervention is a needs-led assessment for patients to prioritise their health and social needs and provide access to local community services and activities. Exploring the work and practices of patients and telephone workers are important for understanding and evaluating the workability and implementation of new interventions. Methods Qualitative methods (interviews, focus group, observations) were used to explore the experience of PLANS from the perspectives of participants and the telephone support workers who delivered it (as part of an RCT) and the reasons why the intervention worked or not. Normalisation Process Theory (NPT) was used as a sensitising tool to evaluate: the relevance of PLANS to patients (coherence); the processes of engagement (cognitive participation); the work done for PLANS to happen (collective action); the perceived benefits and costs of PLANS (reflexive monitoring). 20 patients in the intervention arm of a clinical trial were interviewed and their telephone support calls were recorded and a focus group with 3 telephone support workers was conducted. Results Analysis of the interviews, support calls and focus group identified three themes in relation to the delivery and experience of PLANS. These are: formulation of ‘health’ in the context of everyday life; trajectories and tipping points: disrupting everyday routines; precarious trust in networks. The relevance of these themes are considered using NPT constructs in terms of the work that is entailed in engaging with PLANS, taking action, and who is implicated this process. Conclusions PLANS gives scope to align long-term condition management to everyday life priorities and valued aspects of life. This approach can improve engagement with health-relevant practices by situating them within everyday contexts. This has potential to increase utilisation of local resources with potential cost-saving benefits for the NHS. Trial registration ISRCTN45433299. PMID:24938492

  20. GPU-accelerated Monte Carlo convolution/superposition implementation for dose calculation.

    PubMed

    Zhou, Bo; Yu, Cedric X; Chen, Danny Z; Hu, X Sharon

    2010-11-01

    Dose calculation is a key component in radiation treatment planning systems. Its performance and accuracy are crucial to the quality of treatment plans as emerging advanced radiation therapy technologies are exerting ever tighter constraints on dose calculation. A common practice is to choose either a deterministic method such as the convolution/superposition (CS) method for speed or a Monte Carlo (MC) method for accuracy. The goal of this work is to boost the performance of a hybrid Monte Carlo convolution/superposition (MCCS) method by devising a graphics processing unit (GPU) implementation so as to make the method practical for day-to-day usage. Although the MCCS algorithm combines the merits of MC fluence generation and CS fluence transport, it is still not fast enough to be used as a day-to-day planning tool. To alleviate the speed issue of MC algorithms, the authors adopted MCCS as their target method and implemented a GPU-based version. In order to fully utilize the GPU computing power, the MCCS algorithm is modified to match the GPU hardware architecture. The performance of the authors' GPU-based implementation on an Nvidia GTX260 card is compared to a multithreaded software implementation on a quad-core system. A speedup in the range of 6.7-11.4x is observed for the clinical cases used. The less than 2% statistical fluctuation also indicates that the accuracy of the authors' GPU-based implementation is in good agreement with the results from the quad-core CPU implementation. This work shows that GPU is a feasible and cost-efficient solution compared to other alternatives such as using cluster machines or field-programmable gate arrays for satisfying the increasing demands on computation speed and accuracy of dose calculation. But there are also inherent limitations of using GPU for accelerating MC-type applications, which are also analyzed in detail in this article.

  1. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...

  2. 75 FR 79427 - Self-Regulatory Organizations; NYSE Amex LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... end of December 2010, it will work with the Commission to set a new target date for implementation as... new target date for implementation. The Exchange also has represented that it plans to file a proposed... made to the rules of New York Stock Exchange LLC. See SR-NYSE-2010- 79. \\6\\ See Securities Exchange Act...

  3. A Class Size Reduction (CSR) Implementation Plan Based on an Evaluative Study of CSRs for the Improvement of Third Grade Reading Achievement

    ERIC Educational Resources Information Center

    Vandyke, Barbara Adrienne

    2009-01-01

    For too long, educators have been left to their own devices when implementing educational policies, initiatives, strategies, and interventions, and they have longed to see the full benefits of these programs, especially in reading achievement. However, instead of determining whether a policy/initiative is working, educators have been asked to…

  4. Supporting local planning and budgeting for maternal, neonatal and child health in the Philippines

    PubMed Central

    2013-01-01

    Background Responsibility for planning and delivery of health services in the Philippines is devolved to the local government level. Given the recognised need to strengthen capacity for local planning and budgeting, we implemented Investment Cases (IC) for Maternal, Neonatal and Child Health (MNCH) in three selected sub-national units: two poor, rural provinces and one highly-urbanised city. The IC combines structured problem-solving by local policymakers and planners to identify key health system constraints and strategies to scale-up critical MNCH interventions with a decision-support model to estimate the cost and impact of different scaling-up scenarios. Methods We outline how the initiative was implemented, the aspects that worked well, and the key limitations identified in the sub-national application of this approach. Results Local officials found the structured analysis of health system constraints helpful to identify problems and select locally appropriate strategies. In particular the process was an improvement on standard approaches that focused only on supply-side issues. However, the lack of data available at the local level is a major impediment to planning. While the majority of the strategies recommended by the IC were incorporated into the 2011 plans and budgets in the three study sites, one key strategy in the participating city was subsequently reversed in 2012. Higher level systemic issues are likely to have influenced use of evidence in plans and budgets and implementation of strategies. Conclusions Efforts should be made to improve locally-representative data through routine information systems for planning and monitoring purposes. Even with sound plans and budgets, evidence is only one factor influencing investments in health. Political considerations at a local level and issues related to decentralisation, influence prioritisation and implementation of plans. In addition to the strengthening of capacity at local level, a parallel process at a higher level of government to relieve fund channelling and coordination issues is critical for any evidence-based planning approach to have a significant impact on health service delivery. PMID:23343218

  5. Implementation of Industrial Work Practice management at vocational high school

    NASA Astrophysics Data System (ADS)

    Widodo, Joko; Samsudi, Sunyoto

    2017-03-01

    The purpose of this study was to develop a management model of entrepreneurship-based Industrial Work Practice (Prakerin) at Vocational High School. This research was planned for three years under Research and Development design. The respondents were public and private Vocational High Schools in Semarang, Salatiga and District of Demak, Central Java, Indonesia. Data were collected through interviews, questionnaires, observation, and documentation. The data were analyzed qualitatively and quantitatively. Preliminary study shows that the implementation of Industrial Work Practice at Vocational High School, which has been carried out, was only to prepare the graduates to become an employee of the industry instead of entrepreneur. Further study is needed to develop a management model of entrepreneurship-based Industrial Work Practice at Vocational High School.

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  7. A national action plan for promoting preconception health and health care in the United States (2012-2014).

    PubMed

    Floyd, R Louise; Johnson, Kay A; Owens, Jasmine R; Verbiest, Sarah; Moore, Cynthia A; Boyle, Coleen

    2013-10-01

    Preconception health and health care (PCHHC) has gained increasing popularity as a key prevention strategy for improving outcomes for women and infants, both domestically and internationally. The Action Plan for the National Initiative on Preconception Health and Health Care: A Report of the PCHHC Steering Committee (2012-2014) provides a model that states, communities, public, and private organizations can use to help guide strategic planning for promoting preconception care projects. Since 2005, a national public-private PCHHC initiative has worked to create and implement recommendations on this topic. Leadership and funding from the Centers for Disease Control and Prevention combined with the commitment of maternal and child health leaders across the country brought together key partners from the public and private sector to provide expertise and technical assistance to develop an updated national action plan for the PCHHC Initiative. Key activities for this process included the identification of goals, objectives, strategies, actions, and anticipated timelines for the five workgroups that were established as part of the original PCHHC Initiative. These are further described in the action plan. To assist other groups doing similar work, this article discusses the approach members of the PCHHC Initiative took to convene local, state, and national leaders to enhance the implementation of preconception care nationally through accomplishments, lessons learned, and projections for future directions.

  8. An incentive plan for professional fee collections at an indigent-care teaching hospital.

    PubMed

    Stewart, M G; Jones, D B; Garson, A T

    2001-11-01

    The authors describe the implementation and development of an incentive plan to improve professional fee collections at an indigent-care teaching hospital. They theorized that an incentive plan based on relative value unit (RVU) productivity would increase billings and collections of professional fees. Unique RVU targets were set for individual services based on the number of faculty full-time equivalents and average reported productivity for academic physicians by specialty. The incentive plan was based on the level of expected faculty billings, measured in RVUs, for each department. A "base + incentive" model was used, with the base budget being distributed monthly throughout the year, and the incentive held as a "withhold" to be paid at the year's end only if the billing target in RVUs was met. Additionally, a task force worked with physician billing office and the hospital to improve collections. In the first year after implementation of the system was in place, important increases were noted in total RVU productivity (30.5% over the previous year) and in collections (49.5% over the previous year). Sixteen of 23 departments exceeded their incentive targets, and it was possible to make distributions of professional fees to those departments, to be used within the hospital system to enhance clinical services. Moreover, the plan created an overall positive attitude toward billings and documentation of faculty activities. The authors believe that this kind of incentive plan will be increasingly important for academic faculty working in public hospital systems.

  9. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newsom, H.C.

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted.

  10. Does team training work? Principles for health care.

    PubMed

    Salas, Eduardo; DiazGranados, Deborah; Weaver, Sallie J; King, Heidi

    2008-11-01

    Teamwork is integral to a working environment conducive to patient safety and care. Team training is one methodology designed to equip team members with the competencies necessary for optimizing teamwork. There is evidence of team training's effectiveness in highly complex and dynamic work environments, such as aviation and health care. However, most quantitative evaluations of training do not offer any insight into the actual reasons why, how, and when team training is effective. To address this gap in understanding, and to provide guidance for members of the health care community interested in implementing team training programs, this article presents both quantitative results and a specific qualitative review and content analysis of team training implemented in health care. Based on this review, we offer eight evidence-based principles for effective planning, implementation, and evaluation of team training programs specific to health care.

  11. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  12. An Internationally Coordinated Science Management Plan for Samples Returned from Mars

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Smith, C. L.

    2015-12-01

    Mars Sample Return (MSR) remains a high priority of the planetary exploration community. Such an effort will undoubtedly be too large for any individual agency to conduct itself, and thus will require extensive global cooperation. To help prepare for an eventual MSR campaign, the International Mars Exploration Working Group (IMEWG) chartered the international Mars Architecture for the Return of Samples (iMARS) Phase II working group in 2014, consisting of representatives from 17 countries and agencies. The overarching task of the team was to provide recommendations for progressing towards campaign implementation, including a proposed science management plan. Building upon the iMARS Phase I (2008) outcomes, the Phase II team proposed the development of an International MSR Science Institute as part of the campaign governance, centering its deliberations around four themes: Organization: including an organizational structure for the Institute that outlines roles and responsibilities of key members and describes sample return facility requirements; Management: presenting issues surrounding scientific leadership, defining guidelines and assumptions for Institute membership, and proposing a possible funding model; Operations & Data: outlining a science implementation plan that details the preliminary sample examination flow, sample allocation process, and data policies; and Curation: introducing a sample curation plan that comprises sample tracking and routing procedures, sample sterilization considerations, and long-term archiving recommendations. This work presents a summary of the group's activities, findings, and recommendations, highlighting the role of international coordination in managing the returned samples.

  13. The need for targeted implementation research to improve coverage of basic vaccines and introduction of new vaccines.

    PubMed

    Arora, Narendra K; Lal, Altaf A; Hombach, Joachim M; Santos, Jose I; Bhutta, Zulfiqar A; Sow, Samba O; Greenwood, Brian

    2013-04-18

    The Decade of Vaccines Collaboration (DoVC) Research and Development (R&D) Working Group identified implementation research as an important step toward achieving high vaccine coverage and the uptake of desirable new vaccines. The R&D Working Group noted that implementation research is highly complex and requires participation of stakeholders from diverse backgrounds to ensure effective planning, execution, interpretation, and adoption of research outcomes. Unlike other scientific disciplines, implementation research is highly contextual and depends on social, cultural, geographic, and economic factors to make the findings useful for local, national, and regional applications. This paper presents the broad framework for implementation research in support of immunization and sets out a series of research questions developed through a Delphi process (during a DoVC-supported workshop in Sitges, Spain) and a literature review. Copyright © 2013 Elsevier Ltd. All rights reserved.

  14. Implementation plan for underground waste storage tank surveillance and stabilization improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dukelow, G.T.; Maupin, V.D.; Mihalik, L.A.

    1989-04-01

    Several studies have addressed the need to upgrade the methods currently used for surveillance of underground waste storage tanks, particularly single-shell tanks (SST), which are susceptible to leaks and intrusions. Fifty tasks were proposed to enhance the existing surveillance program; however, prudent budget management dictates that only the tasks with the highest potential for success be selected and funded. This plan identifies fourteen inexpensive improvements that may be implemented in less than two years. Recent developments stress the need to complete interim stabilization of these tanks more quickly than now budgeted and to identify methods to salvage or eliminate themore » interstitial liquid left behind after saltwell jet-pumping. The plan calls for the use of available resources to remove saltwell liquid from SSTs as rapidly as possible rather than committing to new surveillance technologies that might not lead to near-term improvements. This plan describes the selection criteria and provides cost estimates and schedules for implementing the recommendations of the task forces. The proposed improvements result in completion of jet-pumping in FY 1994, two years ahead of the current FY 1996 milestone. While the accelerated plan requires more funding in the early years, the total cost will be the same as completing the work in FY 1996.« less

  15. [Women in informal economy health and work conditions Bogotá. 2007].

    PubMed

    Sotelo-Suárez, Nidia R; Quiroz-Arcentáles, Jorge L; Mahecha-Montilla, Charo P; López-Sánchez, Paola A

    2012-06-01

    To determine work and health conditions of women working in informal economy in Bogotá, as well as to recommend priority action plans for preventing illnesses and accidents related to work and their consequences. Descriptive observational study. This study analyzed information collected by local groups in work-related contexts during 2007 as part of a set of forms of intervention established according to the Plan de Atención Básica (Primary Care Plan). This plan included 3 715 units of informal work from every point of the city. 3 936 women registers in all were analyzed. This study reveals evident precariousness conditions of women in this economic sector. Specifically, there are certain evident conditions that had shown in this study such as low education levels, incomes below the minimum legal standards, high exposure to damaging health work conditions, long work hours, and few hours for leisure and free time. Furthermore, 75 % of women included in this study are female head of household. This condition makes them more vulnerable to a heavier family and social burden. Closer attention to informal economy phenomenon is suggested in order to avoid vulnerable conditions of working women. Besides, it is necessary to improve the articulation between Academy and forms of intervention through public policies for knowing deeply repeated phenomena regarding the population of study. This articulation can be thought for implementing programs designed for improving women's quality of life.

  16. Customizing for clients: developing a library liaison program from need to plan.

    PubMed

    Tennant, M R; Butson, L C; Rezeau, M E; Tucker, P J; Boyle, M E; Clayton, G

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations.

  17. Customizing for clients: developing a library liaison program from need to plan*

    PubMed Central

    Tennant, Michele R.; Butson, Linda C.; Rezeau, Michelle E.; Tucker, Prudence J.; Boyle, Marian E.; Clayton, Greg

    2001-01-01

    Building on the experiences of librarian representatives to curriculum committees in the colleges of dentistry, medicine, and nursing, the Health Science Center Libraries (HSCL) Strategic Plan recommended the formation of a Library Liaison Work Group to create a formal Library Liaison Program to serve the six Health Science Center (HSC) colleges and several affiliated centers and institutes. The work group's charge was to define the purpose and scope of the program, identify models of best practice, and recommend activities for liaisons. The work group gathered background information, performed an environmental scan, and developed a philosophy statement, a program of liaison activities focusing on seven |primary areas, and a forum for liaison communication. Hallmarks of the plan included intensive subject specialization (beyond collection development), extensive communication with users, and personal information services. Specialization was expected to promote competence, communication, confidence, comfort, and customization. Development of the program required close coordination with other strategic plan implementation teams, including teams for collection development, education, and marketing. This paper discusses the HSCL's planning process and the resulting Library Liaison Program. Although focusing on an academic health center, the planning process and liaison model may be applied to any library serving diverse, subject-specific user populations. PMID:11209807

  18. Development and Implementation of a Mental Health Work Rehabilitation Program: Results of a Developmental Evaluation.

    PubMed

    Sylvain, Chantal; Durand, Marie-José; Velasquez Sanchez, Astrid; Lessard, Nathalie; Maillette, Pascale

    2018-05-23

    Purpose Long-term work disability due to common mental disorders (CMDs) is a growing problem. Yet optimal interventions remain unclear and little is known about implementation challenges in everyday practice. This study aimed to support and evaluate, in real time, the development and implementation of a work rehabilitation program (WRP) designed to promote post-CMD return-to-work (RTW). Methods A 2-year developmental evaluation was performed using a participatory approach. At program outset, the researchers held five work meetings to revise the program's logic model and discuss its underlying change theory with clinicians. Data collection tools used throughout the study period were structured charts of activities conducted with workers (n = 41); in-depth interviews with program clinicians and managers (n = 9); and participant observation during work meetings. Quantitative data were analyzed using descriptive statistics. Qualitative data underwent thematic analysis using a processual approach. Results Three types of activity were developed and implemented: individual and group interventions targeting workers, and joint activities targeting partners (physicians, employers, others). While worker-targeted activities were generally implemented as planned, joint activities were sporadic. Analysis of the implementation process revealed five challenges faced by clinicians. Determinants included clinicians, host organization, sociopolitical context and resources provided by the evaluation. Conclusion The program studied is original in that it is based on the best available scientific knowledge, yet adapted to contextual particularities. The identified implementation challenges highlight the need for greater importance to be placed on the external, non-program context to ensure sustainable implementation in everyday practice.

  19. 75 FR 71293 - Approval and Promulgation of Implementation Plans; State of California; 2007 South Coast State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... increased hospital admissions, emergency room visits, absences from school or work, and restricted activity... addition, the State has standards for lawn and garden equipment, recreational vehicles and boats, and other...

  20. What is your hospitality quotient?

    PubMed

    DeSilets, Lyn

    2015-03-01

    In addition to the behind-the-scenes work involved with planning and implementing continuing nursing education activities, there are additional ways we can enhance the learner's experience. This article presents ideas on how to improve your hospitality quotient. Copyright 2015, SLACK Incorporated.

  1. Kennedy Space Center (KSC) Mishap Response Plan

    NASA Technical Reports Server (NTRS)

    Scarpa, Philip

    2005-01-01

    KSC Medical Operations, in exercising the KSC Psychological Triage Plan, provided crewmember family support following notification of the Columbia accident. KSC Medical Operations also provided field support in working with FEMA and EPA to assure adequate occupational medicine and environmental health care of KSC workers. In addition, the development of policy and procedures for handling and clearing biohazardous debris material in the KSC reconstruction hangar was prepared and implemented.

  2. Characteristics and Determinants of Teacher-Designed Pay for Performance Plans: Evidence from Texas' Governor's Educator Excellence Grant (GEEG) Program. Working Paper 2008-26

    ERIC Educational Resources Information Center

    Taylor, Lori L.; Springer, Matthew G.; Ehlert, Mark

    2008-01-01

    This study describes the teacher pay for performance plans designed and implemented by the public schools participating in the Governor's Educator Excellence Grant (GEEG) program in Texas. GEEG is a federally funded, incentive pay program that awarded non-competitive grants, ranging from $60,000 to $220,000 each year for three years, to 99 Texas…

  3. Learning from the implementation of inter-organisational web-based care planning and coordination.

    PubMed

    Walker, Rae; Blacker, Vivian; Pandita, Linda; Close, Jacky; Mason, Wendy; Watson, Julie

    2013-01-01

    In Victoria, despite strong policy support, e-care planning and coordination is poorly developed. The action research project discussed here was developed to overcome organisational and worker-level barriers to change. The project outcomes highlighted the need for work on the building blocks of e-care coordination that enhance workers' knowledge and skills, and provide permission and support for appropriate collaborative system and services coordination practices.

  4. Using neural networks and Dyna algorithm for integrated planning, reacting and learning in systems

    NASA Technical Reports Server (NTRS)

    Lima, Pedro; Beard, Randal

    1992-01-01

    The traditional AI answer to the decision making problem for a robot is planning. However, planning is usually CPU-time consuming, depending on the availability and accuracy of a world model. The Dyna system generally described in earlier work, uses trial and error to learn a world model which is simultaneously used to plan reactions resulting in optimal action sequences. It is an attempt to integrate planning, reactive, and learning systems. The architecture of Dyna is presented. The different blocks are described. There are three main components of the system. The first is the world model used by the robot for internal world representation. The input of the world model is the current state and the action taken in the current state. The output is the corresponding reward and resulting state. The second module in the system is the policy. The policy observes the current state and outputs the action to be executed by the robot. At the beginning of program execution, the policy is stochastic and through learning progressively becomes deterministic. The policy decides upon an action according to the output of an evaluation function, which is the third module of the system. The evaluation function takes the following as input: the current state of the system, the action taken in that state, the resulting state, and a reward generated by the world which is proportional to the current distance from the goal state. Originally, the work proposed was as follows: (1) to implement a simple 2-D world where a 'robot' is navigating around obstacles, to learn the path to a goal, by using lookup tables; (2) to substitute the world model and Q estimate function Q by neural networks; and (3) to apply the algorithm to a more complex world where the use of a neural network would be fully justified. In this paper, the system design and achieved results will be described. First we implement the world model with a neural network and leave Q implemented as a look up table. Next, we use a lookup table for the world model and implement the Q function with a neural net. Time limitations prevented the combination of these two approaches. The final section discusses the results and gives clues for future work.

  5. Organization Readiness and ERP Implementation in Albaha University

    NASA Astrophysics Data System (ADS)

    Alaqeel, K.; Shakkah, M. S.; Rahmat, R. F.; Alfageeh, A.; Budiarto, R.

    2017-04-01

    This work studies the correlation between the organizational readiness in Albaha University and the respective Critical Success Factors with regards to the Enterprise Resource Planning (ERP) implementation. The study also considers some suggestions to improve the ABU’s ERP systems and roadmap towards the self -development strategy and to reduce vendor-dependency. A survey regarding ERP to the end-users, experts and developers in Albaha University was conducted. The analysis of the results in this work confirmed with the results of an existing work. The four significance success factors: Project Management, Business Process Re-engineering, System Integration, and Training and Education are recommended to be adopted to assure the smooth adoption of ERP at Albaha University.

  6. Strengthening decentralized primary healthcare planning in Nigeria using a quality improvement model: how contexts and actors affect implementation.

    PubMed

    Eboreime, Ejemai Amaize; Nxumalo, Nonhlanhla; Ramaswamy, Rohit; Eyles, John

    2018-05-08

    Quality improvement models have been applied across various levels of health systems with varying success leading to scepticisms about effectiveness. Health systems are complex, influenced by contexts and characterized by numerous interests. Thus, a shift in focus from examining whether improvement models work, to understanding why, when and where they work most effectively is essential. Nigeria introduced DIVA (Diagnose-Intervene-Verify-Adjust) as a model to strengthen decentralized PHC planning. However, implementation has been poorly sustained. This article explores the role of actors and context in implementation and sustainability of DIVA in two local government areas (LGAs) in Nigeria. We employed an integrated mixed method approach in which qualitative data was used in conjunction with quantitative to understand effects of actors and contexts on implementation outcomes. We analysed policy documents and conducted interviews with PHC managers. Then using the Model for Understanding Success in Quality (MUSIQ), we measured contextual factors affecting implementation of DIVA in the selected LGAs. The LGAs scored 117.42 and 104.67 out of 168 points on the MUSIQ scale, respectively, indicating contextual barriers exist. Both have strong DIVA team attributes, but these could not independently ensure quality implementation. Although external support accounted for the greatest contextual disparities, the utmost implementation challenges relate to subnational government leadership, management, financial and technical support. Although higher levels of government may set visionary goals for PHC, interventions are potentially skewed towards donor interests at lower (implementation) levels. Thus, subnational political will is a key determinant of quality implementation. Consequently, advocacy for responsible and accountable political governance is essential in comparable decentralized contexts.

  7. Mission and Safety Critical (MASC) plans for the MASC Kernel simulation

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This report discusses a prototype for Mission and Safety Critical (MASC) kernel simulation which explains the intended approach and how the simulation will be used. Smalltalk is chosen for the simulation because of usefulness in quickly building working models of the systems and its object-oriented approach to software. A scenario is also introduced to give details about how the simulation works. The eventual system will be a fully object-oriented one implemented in Ada via Dragoon. To implement the simulation, a scenario using elements typical of those in the Space Station, was created.

  8. Strategic planning for radiology: opening an outpatient diagnostic imaging center.

    PubMed

    Leepson, Evan

    2003-01-01

    Launching a new diagnostic imaging center involves very specific requirements and roadmaps, including five major areas of change that have a direct impact on planning: Imaging and communication technology Finances and reimbursement Ownership structure of imaging entities Critical workforce shortages Imaging is moving outside radiology First, planning must focus on the strategic level of any organization, whether it is a multi-national corporation or a six-person radiology group. Think of all organizations as a triangle with three horizontal levels: strategic, managerial and operational. The strategic level of decision-making is at the top of the triangle, and here is where planning must take place. For strategic planning to work, there must be focused time and energy spent on this activity, usually away from the reading room and imaging center. There are five planning strategies, which must have the explicit goal of developing and growing the imaging center. The five strategies are: Clinical and quality issues, Governance and administration, Technology, Relationships, Marketing and business development. The best way to plan and implement these strategies is to create work groups of radiologists, technologists, and administrative and support staff. Once the group agrees on the strategy and tactic, it takes responsibility for implementation. Embarking on the launch of a new outpatient diagnostic imaging center is no small undertaking, and anyone who has struggled with such an endeavor can readily attest to the associated challenges and benefits. Success depends on many things, and one of the most important factors relates to the amount of time and the quality of effort spent on strategic planning at the outset. Neglecting or skimping on this phase may lead to unforeseen obstacles that could potentially derail the project.

  9. Developments in Assisting Countries in Implementing the IAEA Additional Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Killinger, Mark H.; Hansen, Linda H.; Cain, Ronald A.

    In 2008, the U.S. Department of Energy (DOE) began assisting selected non-nuclear weapon states in planning and preparing for implementation of the International Atomic Energy Agency’s Additional Protocol (AP). Since then, the AP international implementation program has contributed to the substantial progress made by Vietnam, Thailand, Iraq, and Malaysia in preparing for entry-into-force of the AP. An overall engagement plan has been developed with components designed to train government AP implementing agencies, inform policy makers, conduct outreach to industry and universities, make AP reporting software available and useful, and plan a detailed approach for implementing the declaration and complementary accessmore » provisions of the AP. DOE recently began collaborating with Indonesia, which has already entered the AP into force, requiring a second method of engagement somewhat different from that taken with countries that have not entered the AP into force. The AP international implementation program, administered by the International Nuclear Safeguards and Engagement Program, is working more closely with DOE’s International Nonproliferation Export Control Program to ensure countries are aware of and prepared to implement the export/import provisions of the AP. As the AP implementation program matures and helps move countries closer to entry-into-force or improved AP implementation, it is identifying characteristics of a country’s “end-state” that indicate that DOE assistance is no longer required. The U.S. AP Implementation Act and Senate Resolution of Ratification require the Administration to report annually to Congress on measures taken to achieve the adoption of the AP in non-nuclear weapon states. DOE’s AP international implementation program is a significant part of these measures. This paper describes recent developments to increase the scope and effectiveness of the program.« less

  10. Developing More Authentic e-Courses by Integrating Working Life Mentoring and Social Media

    ERIC Educational Resources Information Center

    Leppisaari, Irja; Kleimola, Riina; Herrington, Jan; Maunula, Markus; Hohenthal, Tuula

    2014-01-01

    Studies show that affordances of social media have not yet been fully exploited in the promotion of authentic e-learning in higher education. The e-Learning of the Future project (2009-2011) has met these challenges through working life mentoring using social media. In this paper, we examine the planning and implementation of social media in nine…

  11. Exemplar Units of Work for English. Key Stage 3: National Strategy.

    ERIC Educational Resources Information Center

    Department for Education and Skills, London (England).

    These exemplar units of work for National Strategy Key Stage 3 English show how medium and short-term planning can be based on the Key Stage 3 Framework objectives and support the implementation of Curriculum 2000. The Key Stage 3 English strand introduces pupils to more specialist study of language and literature and supports the study of…

  12. Challenges and Strategies of Working with Learners with Low Vision: Implications for Teacher Training

    ERIC Educational Resources Information Center

    Yalo, J. A.; Indoshi, F. C.; Agak, J. O.

    2012-01-01

    Learners with low vision can be trained to increase their visual functioning through a planned programme of visual experiences. Such a low vision training programme was introduced in Kenya in 1994. However, despite its implementation over the last 15 years, challenges still persist among teachers who work with such learners. The purpose of this…

  13. 77 FR 43205 - Notice of Data Availability for Approval, Disapproval and Promulgation of Implementation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...

  14. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  15. JPL Contamination Control Engineering

    NASA Technical Reports Server (NTRS)

    Blakkolb, Brian

    2013-01-01

    JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.

  16. Professional Attitudes of the Teachers in Implementation of a School-Based Programme about Prevention of the Use Psychoactive Substances in 5-7 Grade

    ERIC Educational Resources Information Center

    Kozhuharova, Penka Petkova

    2015-01-01

    The subject of the research is the planning, implementation and evaluation of the program about prevention of the use of psychoactive substances among students 5-7 grade. The study was conducted by survey method with 314 teachers who teach in twenty-six schools. The qualification of the teachers to work with the program about prevention was…

  17. Flex for Success!

    ERIC Educational Resources Information Center

    Olmsted, Barney; Smith, Suzanne

    1989-01-01

    The authors state that flexible scheduling of work will become more common as employers attempt to deal with changes in the labor supply. Types of flexibility and potential benefits are described. The authors present the steps in developing and implementing a flexible workplace plan. (CH)

  18. Is an advance care planning model feasible in community palliative care? A multi-site action research approach.

    PubMed

    Blackford, Jeanine; Street, Annette

    2012-09-01

    This article reports a study to determine the feasibility of an advance care planning model developed with Australian community palliative care services. An effective advance care planning programme involves an organizational wide commitment and preparedness for health service reform to embed advance care planning into routine practice. Internationally, such programmes have been implemented predominantly in aged and acute care with more recent work in primary care. A multi-site action research was conducted over a 16-month period in 2007-2009 with three Victorian community palliative care services. Using mixed method data collection strategies to assess feasibility, we conducted a baseline audit of staff and clients; analysed relevant documents (client records, policies, procedures and quality improvement strategies) pre-implementation and post-implementation and conducted key informant interviews (n = 9). Three community palliative care services: one regional and two metropolitan services in Victoria, Australia. The services demonstrated that it was feasible to embed the Model into their organizational structures. Advance care planning conversations and involvement of family was an important outcome measure rather than completion rate of advance care planning documents in community settings. Services adapted and applied their own concept of community, which widened the impact of the model. Changes to quality audit processes were essential to consolidate the model into routine palliative care practice. An advance care planning model is feasible for community palliative care services. Quality audit processes are an essential component of the Model with documentation of advance care planning discussion established as an important outcome measure. © 2011 Blackwell Publishing Ltd.

  19. Managed competition that works.

    PubMed

    Caper, P

    1993-05-19

    President Clinton has advocated managed competition within a global budget as a long-term strategy for simultaneously controlling health care costs and expanding access to medical care to all Americans. This proposal is intended to show how these two seemingly conflicting goals can be simultaneously accomplished. Managed competition, as it has been conceptualized to date, is primarily a strategy for reforming the system of providing health services. To work, it must be joined with a strategy for reforming our system of financing and paying for those services and of limiting overall system capacity. "Managed Competition That Works" is a proposal that would create a single trust-funded national system of health insurance, implemented through a system of vouchers to individuals. Global budgeting would be accomplished through establishment of the voucher's value each year. The trust fund would pay health plans for all medical care by capitation, but health plans would be free to negotiate a variety of payment arrangements with physicians, hospitals, and other providers. All plans would be required to offer a standard package of benefits, but would have great flexibility in offering benefits beyond the scope of the standard package, if those benefits replace high-cost with lower-cost services or permit the plan to compete more effectively for market share. This proposal would establish firm but acceptable national budget limits; provide universal, comprehensive, and uniform insurance coverage; eliminate cost shifting; encourage competition; reward efficiency-improving innovation; greatly reduce the need for centralized micromanagement of medical care; and retain local determination and a somewhat reduced level of consumer choice. Although this proposal is written as a national plan, trust funds could be implemented at the state level, if problems associated with portability of benefits among states could be solved.

  20. When the bells toll: engaging healthcare providers in catastrophic disaster response planning.

    PubMed

    Hanfling, Dan

    2013-01-01

    Catastrophic disaster planning and response have been impeded by the inability to better coordinate the many components of the emergency response system. Healthcare providers in particular have remained on the periphery of such planning because of a variety of real or perceived barriers. Although hospitals and healthcare systems have worked successfully to develop surge capacity and capability, less successful have been the attempts to inculcate such planning in the private practice medical community. Implementation of a systems approach to catastrophic disaster planning that incorporates healthcare provider participation and engagement as one of the first steps toward such efforts will be of significant importance in ensuring that a comprehensive and successful emergency response will ensue.

  1. The Component Model of Infrastructure: A Practical Approach to Understanding Public Health Program Infrastructure

    PubMed Central

    Snyder, Kimberly; Rieker, Patricia P.

    2014-01-01

    Functioning program infrastructure is necessary for achieving public health outcomes. It is what supports program capacity, implementation, and sustainability. The public health program infrastructure model presented in this article is grounded in data from a broader evaluation of 18 state tobacco control programs and previous work. The newly developed Component Model of Infrastructure (CMI) addresses the limitations of a previous model and contains 5 core components (multilevel leadership, managed resources, engaged data, responsive plans and planning, networked partnerships) and 3 supporting components (strategic understanding, operations, contextual influences). The CMI is a practical, implementation-focused model applicable across public health programs, enabling linkages to capacity, sustainability, and outcome measurement. PMID:24922125

  2. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  3. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...

  4. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...

  5. Focus on Customer Service. Service Management: How to Plan for it Rather Than Hope for It [and] Learning to Say "Yes": A Customer Service Program for Library Staff [and] Maintaining Momentum in a Quality Improvement Process.

    ERIC Educational Resources Information Center

    Brewer, Julie; And Others

    1995-01-01

    Presents three articles that discuss customer service in libraries, with a focus on planning for service management, a customer service program for library staff, and a quality improvement process. Highlights include developing and implementing service strategies, dealing with requests, redefining work relationships, coworkers as customers,…

  6. An Incentive Pay Plan for Advanced Practice Registered Nurses: Impact On Provider and Organizational Outcomes.

    PubMed

    Rhodes, Catherine A; Bechtle, Mavis; McNett, Molly

    2015-01-01

    Advanced practice registered nurses (APRNs) are integral to the provision of quality, cost-effective health care throughout the continuum of care. To promote job satisfaction and ultimately decrease turnover, an APRN incentive plan based on productivity and quality was formulated. Clinical productivity in the incentive plan was measured by national benchmarks for work relative value units for nonphysician providers. After the first year of implementation, APRNs were paid more for additional productivity and quality and the institution had an increase in patient visits and charges. The incentive plan is a win-win for hospitals that employ APRNs.

  7. Multilevel Interventions Targeting Obesity: Research Recommendations for Vulnerable Populations.

    PubMed

    Stevens, June; Pratt, Charlotte; Boyington, Josephine; Nelson, Cheryl; Truesdale, Kimberly P; Ward, Dianne S; Lytle, Leslie; Sherwood, Nancy E; Robinson, Thomas N; Moore, Shirley; Barkin, Shari; Cheung, Ying Kuen; Murray, David M

    2017-01-01

    The origins of obesity are complex and multifaceted. To be successful, an intervention aiming to prevent or treat obesity may need to address multiple layers of biological, social, and environmental influences. NIH recognizes the importance of identifying effective strategies to combat obesity, particularly in high-risk and disadvantaged populations with heightened susceptibility to obesity and subsequent metabolic sequelae. To move this work forward, the National Heart, Lung, and Blood Institute, in collaboration with the NIH Office of Behavioral and Social Science Research and NIH Office of Disease Prevention convened a working group to inform research on multilevel obesity interventions in vulnerable populations. The working group reviewed relevant aspects of intervention planning, recruitment, retention, implementation, evaluation, and analysis, and then made recommendations. Recruitment and retention techniques used in multilevel research must be culturally appropriate and suited to both individuals and organizations. Adequate time and resources for preliminary work are essential. Collaborative projects can benefit from complementary areas of expertise and shared investigations rigorously pretesting specific aspects of approaches. Study designs need to accommodate the social and environmental levels under study, and include appropriate attention given to statistical power. Projects should monitor implementation in the multiple venues and include a priori estimation of the magnitude of change expected within and across levels. The complexity and challenges of delivering interventions at several levels of the social-ecologic model require careful planning and implementation, but hold promise for successful reduction of obesity in vulnerable populations. Copyright © 2016. Published by Elsevier Inc.

  8. Multilevel Interventions Targeting Obesity: Research Recommendations for Vulnerable Populations

    PubMed Central

    Stevens, June; Pratt, Charlotte; Boyington, Josephine; Nelson, Cheryl; Truesdale, Kimberly P.; Ward, Dianne S.; Lytle, Leslie; Sherwood, Nancy E.; Robinson, Thomas N.; Moore, Shirley; Barkin, Shari; Cheung, Ying Kuen; Murray, David M.

    2017-01-01

    Introduction The origins of obesity are complex and multifaceted. To be successful, an intervention aiming to prevent or treat obesity may need to address multiple layers of biological, social, and environmental influences. Methods NIH recognizes the importance of identifying effective strategies to combat obesity, particularly in high-risk and disadvantaged populations with heightened susceptibility to obesity and subsequent metabolic sequelae. To move this work forward, the National Heart, Lung, and Blood Institute, in collaboration with the NIH Office of Behavioral and Social Science Research and NIH Office of Disease Prevention convened a working group to inform research on multilevel obesity interventions in vulnerable populations. The working group reviewed relevant aspects of intervention planning, recruitment, retention, implementation, evaluation, and analysis, and then made recommendations. Results Recruitment and retention techniques used in multilevel research must be culturally appropriate and suited to both individuals and organizations. Adequate time and resources for preliminary work are essential. Collaborative projects can benefit from complementary areas of expertise and shared investigations rigorously pretesting specific aspects of approaches. Study designs need to accommodate the social and environmental levels under study, and include appropriate attention given to statistical power. Projects should monitor implementation in the multiple venues and include a priori estimation of the magnitude of change expected within and across levels. Conclusions The complexity and challenges of delivering interventions at several levels of the social—ecologic model require careful planning and implementation, but hold promise for successful reduction of obesity in vulnerable populations. PMID:28340973

  9. Strengthening TB infection control in specialized health facilities in Romania--using a participatory approach.

    PubMed

    Turusbekova, N; Popa, C; Dragos, M; van der Werf, M J; Dinca, I

    2016-02-01

    In 2012, the tuberculosis (TB) notification rate among Romanian TB facility doctors and nurses was 7.2 times higher than in the general population. This indicates that transmission is ongoing inside TB facilities and that TB infection control measures are insufficient. To help prevent nosocomial TB transmission a project was implemented that aimed at providing nationwide tailor-made technical assistance in TB infection control (TB-IC) in TB treatment facilities, including the development of TB infection control plans. The objective of the present article is to describe the implementation of the project and to discuss successes and challenges. The project was an implementation study using two methods of evaluation: (1) a cross sectional questionnaire study; and (2) collection of information, during the training, on challenges related to infection control and to the project implementation. The project team developed a TB facility infection control (TB-IC) plan template, together with the Romanian experts. The template was discussed and agreed upon with the experts at a meeting and thereafter distributed by email to all TB facilities. Afterwards, a training of trainers (TOT) seminar was organized which included the provision of information about different training methods, as well as information about TB-IC. The TOT was followed by training for key TB-IC providers. Information about use of the TB-IC template was gathered through a self-administered questionnaire sent to all participants of the expert meeting and the training (42 people). Additionally, non-systematized discussions were held on broader challenges in TB-IC implementation during the training. Within the project 42 key TB-IC service providers were trained in TB-IC, including 9 who were trained at a TOT seminar. The trainees were specialists working at the national level, such as country TB coordinators, or at the TB facility level: TB doctors, epidemiologists, laboratory specialists and maintenance engineers. Out of 42 key TB-IC service providers who were trained, only eighteen responded to the questionnaire (no reminders were sent). Out of these, 14 had used the TB-IC plan template after the project team disseminated it to them by email. The remaining four TB-IC service providers indicated that they were planning to use the template to develop or update their facility TB-IC plans. Related to the use of TB-IC plan template, the following broader challenges in TB-IC were identified: a lack of authority of the individuals responsible for TB-IC to implement the TB-IC measures, lack of training among facility epidemiologists on TB, underdeveloped system for reporting TB in healthcare workers, difficulties with triage of the TB suspects, and poor facility infrastructure hampering implementation of TB-IC measures. Implementing TB-IC plans in Romanian health care facilities proved to be challenging, mainly due to the fact that the national infection control plan for TB was not yet adopted at the time of project implementation, and therefore there was neither a regulatory framework to support TB facility-IC planning nor any related budget allocations for the implementation of the facilities' TB-IC plans. Nonetheless, most respondents who answered the questionnaire (18 of 42 responded) indicated that they had started using the TB-IC plan template, which represents a full package of infection control measures that, when implemented effectively and in its entirety, may be expected to reduce nosocomial transmission. The study's limitations are: very low survey response rate, thus there is a likelihood of responder bias. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  10. Implementation of Policy, Systems, and Environmental Community-Based Interventions for Cardiovascular Health Through a National Not-for-Profit: A Multiple Case Study.

    PubMed

    Garney, Whitney R; Szucs, Leigh E; Primm, Kristin; King Hahn, Laura; Garcia, Kristen M; Martin, Emily; McLeroy, Kenneth

    2018-05-01

    In 2014, the Centers for Disease Control and Prevention funded the American Heart Association to implement policy, systems, and environment-focused strategies targeting access to healthy food and beverages, physical activity, and smoke-free environments. To understand factors affecting implementation and variations in success across sites, evaluators conducted a multiple case study. Based on past literature, community sites were categorized as capacity-building or implementation-ready, for comparison. A sample of six communities were selected using a systematic selection tool. Through site visits, evaluators conducted interviews with program staff and community partners and assessed action plans. Evaluators identified important implications for nationally coordinated community-based prevention programming. Differences in implementation varied by the communities' readiness, with the most notable differences in how they planned activities and defined success. Existing partner relationships (or lack thereof) played a significant role, regardless of the American Heart Association's existing presence within the communities, in the progression of initiatives and the differences observed among phases. Last, goals in capacity-building sites were tied to organizational goals while goals in implementation-ready sites were more incremental with increased community influence and buy-in. Using national organizations as a mechanism to carry out large-scale community-based prevention work is a viable option that provides coordinated, wide-scale implementation without sacrificing a community's priorities or input. In funding future initiatives, the presence of relationships and the time needed to cultivate such relationships should be accounted for in the planning and implementation processes, as well as both local and national expectations.

  11. Statement of Intent between EPA and the European Chemicals Agency (ECHA)

    EPA Pesticide Factsheets

    This page contains a Statement of Intent between EPA and the European Chemicals Agency (ECHA) to exchange information, training and experience on chemical safety and the 2015-2016 Rolling Work Plan of activities to implement the Statement of Intent.

  12. Best management practices used by KYTC for on-site erosion control.

    DOT National Transportation Integrated Search

    2006-11-01

    New erosion control procedures (ECP) have recently been implemented by the Kentucky Transportation Cabinet (KYTC). Previously, consultants and designers developed the ECP as a part of the design plans. In many cases these did not work in the field. T...

  13. Community Agency Voice and Benefit in Service-Learning

    ERIC Educational Resources Information Center

    Miron, Devi; Moely, Barbara E.

    2006-01-01

    Supervisors from 40 community agencies working with a university-based service-learning program were interviewed regarding the extent of their input in service-learning program planning and implementation "(Agency Voice), Interpersonal Relations" with service-learning students, "Perceived Benefit" of the service-learning…

  14. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    DOT National Transportation Integrated Search

    1998-11-01

    The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...

  15. Pikes Peak conceptual shuttle study : visitation trends and scenario planning

    DOT National Transportation Integrated Search

    2016-04-01

    This study for the U.S. Forest Service provides a preliminary analysis and set of recommendations to support the agency's work moving forward to implement a shuttle system at Colorados popular Pikes Peak in Pike and San Isabel National Forests. Th...

  16. Approved Air Quality Implementation Plans in The Virgin Islands

    EPA Pesticide Factsheets

    This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.

  17. Dosimetric evaluation of the clinical implementation of the first commercial IMRT Monte Carlo treatment planning system at 6 MV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Heath, Emily; Seuntjens, Jan; Sheikh-Bagheri, Daryoush

    2004-10-01

    In this work we dosimetrically evaluated the clinical implementation of a commercial Monte Carlo treatment planning software (PEREGRINE, North American Scientific, Cranberry Township, PA) intended for quality assurance (QA) of intensity modulated radiation therapy treatment plans. Dose profiles calculated in homogeneous and heterogeneous phantoms using this system were compared to both measurements and simulations using the EGSnrc Monte Carlo code for the 6 MV beam of a Varian CL21EX linear accelerator. For simple jaw-defined fields, calculations agree within 2% of the dose at d{sub max} with measurements in homogeneous phantoms with the exception of the buildup region where the calculationsmore » overestimate the dose by up to 8%. In heterogeneous lung and bone phantoms the agreement is within 3%, on average, up to 5% for a 1x1 cm{sup 2} field. We tested two consecutive implementations of the MLC model. After matching the calculated and measured MLC leakage, simulations of static and dynamic MLC-defined fields using the most recent MLC model agreed to within 2% with measurements.« less

  18. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  19. KDHE Project Code: C6-074-00002: Progress and Monitoring Report for the LDB/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  20. KDHE POroject Code: C6-074-00002: Progress and Monitoring Report for the LBD/SVE/AS System at the Former CCC/USDA Grain Storage Facility, Agra, Kansas, in January-June 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    In 2008-2009, to address the carbon tetrachloride contamination detected on its former property, the CCC/USDA implemented a source area cleanup in accord with the document Interim Measure Work Plan/Design for Agra, Kansas (IMWP/D; Argonne 2008). The cleanup involves five large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparge (AS) systems. The work plan was approved by the Kansas Department of Health and Environment (KDHE) in November 2008 (KDHE 2008b), and operation began in May 2009.

  1. Strategic workforce planning for a multihospital, integrated delivery system.

    PubMed

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.

  2. Applying Resource Based Relative Value Scales (RBRVS) to the Champus Program

    DTIC Science & Technology

    1990-12-01

    fee for the related service .[Ref. 6:p. 7] F. EFFECTS OF RBRVS When a Medicare fee schedule is fully implemented, several Important...reimbursement rates increase would be attracted to CHAMPUS. In analyzing the impact of a resource based fee schedule on the Medicare program, the PPRC...procedures performed by physicians into components of work, training costs, and practice costs. The Medicare program is planning to implement a fee

  3. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1991-01-01

    This quarterly reports on space communications, radio navigation, radio science, and ground based radio and radar astronomy in connection with the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and in operations. Also included is standards activity at JPL for space data and information systems and DSN work. Specific areas of research are: Tracking and ground based navigation; Spacecraft and ground communications; Station control and system technology; DSN Systems Implementation; and DSN Operations.

  4. The Effect of a Community Project on Sense of Community among Social Work Students: An Exploratory Evaluative Study

    ERIC Educational Resources Information Center

    Boehm, Amnon; Moin, Victor

    2014-01-01

    This article evaluates the effect of a community project that was adopted by the students of a school of social work in Israel. A quasi-experimental pretest-posttest design was used. The pretest was administered during the planning stage of the project and the posttest a year later, during the implementation period. The findings show a significant…

  5. 77 FR 48061 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...

  6. A survey of the family planning work done in Dongguan County.

    PubMed

    Wang, L; Hu, F; Liu, F

    1985-08-01

    The total fertility rate of women of childbearing age of Dongguan County in China has been decreasing gradually from 5.9 during the period following the liberation in 1949 to 2.05 in 1982. In order to encourage young couples to implement the policy of family planning consciously, the people's government of Dongguan county decided in July 1980 that all cadres and employees in county towns who received 1-child certificates would be exempted from house rent of 45 square meters from the time they get their certificates and would be allocated a living space of a 2-children family until their children reached age 16. It also stipulated that every couple could enjoy 1 month's holiday every year for 3 years and during the holiday, their salary, bonus and rate of attendance would not be affected. Because women bear less children today, they are relieved from heavy household chores and become the main working force in collective production. As a result, the development of town-run enterprises was stimulated and the total industrial output value of these enterprises increased. The average monthly salary of each female worker is about 100 yuan. In 1984, the average income per capita of the country rose to 649.2 yuan. The implementation of family planning work has eased the tension in the education field. Previously, because of the large number of school-age children in rural areas, teachers had to teach 2 classes. In the past 4 years, great emphasis was laid on intellectual investment. During this period, 2351 schools were built and several fundraising projects were implemented. Since 1981, more than 200 new running water projects were built, and new public services have been developed, including old age homes.

  7. Case study of open-source enterprise resource planning implementation in a small business

    NASA Astrophysics Data System (ADS)

    Olson, David L.; Staley, Jesse

    2012-02-01

    Enterprise resource planning (ERP) systems have been recognised as offering great benefit to some organisations, although they are expensive and problematic to implement. The cost and risk make well-developed proprietorial systems unaffordable to small businesses. Open-source software (OSS) has become a viable means of producing ERP system products. The question this paper addresses is the feasibility of OSS ERP systems for small businesses. A case is reported involving two efforts to implement freely distributed ERP software products in a small US make-to-order engineering firm. The case emphasises the potential of freely distributed ERP systems, as well as some of the hurdles involved in their implementation. The paper briefly reviews highlights of OSS ERP systems, with the primary focus on reporting the case experiences for efforts to implement ERPLite software and xTuple software. While both systems worked from a technical perspective, both failed due to economic factors. While these economic conditions led to imperfect results, the case demonstrates the feasibility of OSS ERP for small businesses. Both experiences are evaluated in terms of risk dimension.

  8. Implementation of HIV and Tuberculosis Diagnostics: The Importance of Context.

    PubMed

    Dominique, Joyelle K; Ortiz-Osorno, Alberto A; Fitzgibbon, Joseph; Gnanashanmugam, Devasena; Gilpin, Christopher; Tucker, Timothy; Peel, Sheila; Peter, Trevor; Kim, Peter; Smith, Steven

    2015-10-15

    Novel diagnostics have been widely applied across human immunodeficiency virus (HIV) and tuberculosis prevention and treatment programs. To achieve the greatest impact, HIV and tuberculosis diagnostic programs must carefully plan and implement within the context of a specific healthcare system and the laboratory capacity. A workshop was convened in Cape Town in September 2014. Participants included experts from laboratory and clinical practices, officials from ministries of health, and representatives from industry. The article summarizes best practices, challenges, and lessons learned from implementation experiences across sub-Saharan Africa for (1) building laboratory programs within the context of a healthcare system; (2) utilizing experience of clinicians and healthcare partners in planning and implementing the right diagnostic; and (3) evaluating the effects of new diagnostics on the healthcare system and on patient health outcomes. The successful implementation of HIV and tuberculosis diagnostics in resource-limited settings relies on careful consideration of each specific context. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2015. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  9. CTH Implementation of a Two-Phase Material Model With Strength: Application to Porous Materials

    DTIC Science & Technology

    2012-07-01

    he worked in the Lavrentyev Institute of Hydrodynamics (Russian Academy of Science) in the area of constitutive modelling for problems of high...velocity impact. Anatoly obtained a PhD in Physics and Mathematics from the Institute of Hydrodynamics in 1985. In 1996-1998 he worked in a private...silica in the present consideration. Further work is planned to account for a phase transition using the three-phase modelling approach [1]. In the

  10. Appreciative inquiry with nurses who work with children of incarcerated parents.

    PubMed

    Falk, Kathleen J

    2014-10-01

    An appreciative inquiry study was conducted with 12 nurse-mentors who worked with children of incarcerated parents. The aim was to generate best practice knowledge for working with these children. The nurse-mentoring program, based on theorists Peplau and Erickson and colleagues, was implemented to promote optimum health outcomes among children at high risk for incarceration. Through this study method, nurse mentors discovered what was effective as they created a collective vision for future practice. An action plan was implemented, evaluated, and conclusions were drawn. Data from this study imply that nurse-mentoring can be used with other vulnerable populations. Nurses should use appreciative inquiry to transform healthcare, particularly in situations with seemingly intransigent solutions. © The Author(s) 2014.

  11. ALARA database value in future outage work planning and dose management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, D.W.; Green, W.H.

    1995-03-01

    ALARA database encompassing job-specific duration and man-rem plant specific information over three refueling outages represents an invaluable tool for the outage work planner and ALARA engineer. This paper describes dose-management trends emerging based on analysis of three refueling outages at Clinton Power Station. Conclusions reached based on hard data available from a relational database dose-tracking system is a valuable tool for planning of future outage work. The system`s ability to identify key problem areas during a refueling outage is improving as more outage comparative data becomes available. Trends over a three outage period are identified in this paper in themore » categories of number and type of radiation work permits implemented, duration of jobs, projected vs. actual dose rates in work areas, and accuracy of outage person-rem projection. The value of the database in projecting 1 and 5 year station person-rem estimates is discussed.« less

  12. [Integration of the nursing process in the electronic health record in an university hospital].

    PubMed

    Guadarrama-Ortega, D; Delgado-Sánchez, P; Martínez-Piedrola, M; López-Poves, E M; Acevedo-García, M; Noguera-Quijada, C; Camacho-Pastor, J L

    To describe the process of implementation of Individualized Care Plan in the Electronic Health Record and its impact on the University Hospital Alcorcón Foundation. Working groups of staff nurses who analyzed activities usually performed to create a catalog of diagnoses, outcomes and interventions. A group of referents that refined the catalog to make it manageable was created. A training plan, nursing assessment forms and the Nursing Discharge Report were designed. In February 2016 the new methodology was implemented in inpatient units of adults. Between 74.86 and 88.18% of the patients underwent a care plan with the new methodology. Between 69.41 and 76.25% of patients are discharged with a Nursing Discharge Report accordance with regulations. An increase of 24.1% of patients with Nursing Discharge Report after implantation is observed (P=.000; RR: 1.46; 95% CI 1.36-1.56). A total of 116 nurses has been trained. In the study conditions, the use of nursing taxonomies has generated thinking skills and allowed nurses to issue judgments, ensure quality of care, and implementing interventions with a planned results. The nursing taxonomy and care plan in the Electronic Health Record have increased interprofessional communication to improve continuity of care through improved Nursing Discharge Report. Copyright © 2017 SECA. Publicado por Elsevier España, S.L.U. All rights reserved.

  13. Discussion and Reflection on Several Core Issues in the Grand Canal Heritage Conservation Planning Under the Background of Application for World Heritage

    NASA Astrophysics Data System (ADS)

    Yao, D.; Dai, D. S.; Tang, Y. Z.; Zhu, G. Y.; Chen, X.

    2015-08-01

    At the turn of the century, a series of new heritage concepts have appeared in the area of international cultural heritage protection, such as cultural landscape, cultural route, heritage corridor, heritage canal, which presents the development of people's recognition of cultural heritage. According to The Operational Guidelines for the Implementation of the World Heritage Convention, management planning must be contained in the material used to apply for world heritage. The State Administration of Cultural Heritage designed the mission and work schedule of China's Grand Canal conservation planning in 2008. This research will introduce the working system of China's Grand Canal conservation planning on three levels: city, province and nation. It will also summarize the characteristics of the core technologies in China's Grand Canal conservation planning, including key issues like the identification of the core characteristic of China's Grand Canal, value assessment and determination of the protection scope. Through reviewing, thinking and analyzing the previous accomplishments, the research will offer some advices for the similar world heritage conservation planning after.

  14. Role of GIS in social sector planning: can developing countries benefit from the examples of primary health care (PHC) planning in Britain?

    PubMed

    Ishfaq, Mohammad; Lodhi, Bilal Khan

    2012-04-01

    Social sector planning requires rational approaches where community needs are identified by referring to relative deprivation among localities and resources are allocated to address inequalities. Geographical information system (GIS) has been widely argued and used as a base for rational planning for equal resource allocation in social sectors around the globe. Devolution of primary health care is global strategy that needs pains taking efforts to implement it. GIS is one of the most important tools used around the world in decentralization process of primary health care. This paper examines the scope of GIS in social sector planning by concentration on primary health care delivery system in Pakistan. The work is based on example of the UK's decentralization process and further evidence from US. This paper argues that to achieve benefits of well informed decision making to meet the communities' needs GIS is an essential tool to support social sector planning and can be used without any difficulty in any environment. There is increasing trend in the use of Health Management Information System (HMIS) in Pakistan with ample internet connectivity which provides well established infrastructure in Pakistan to implement GIS for health care, however there is need for change in attitude towards empowering localities especially with reference to decentralization of decision making. This paper provides GIS as a tool for primary health care planning in Pakistan as a starting point in defining localities and preparing locality profiles for need identification that could help developing countries in implementing the change.

  15. Development, implementation, and evaluation of the Apollo model of pediatric rehabilitation service delivery.

    PubMed

    Camden, Chantal; Swaine, Bonnie; Tétreault, Sylvie; Bergeron, Sophie; Lambert, Carole

    2013-05-01

    This article presents the experience of a rehabilitation program that undertook the challenge to reorganize its services to address accessibility issues and improve service quality. The context in which the reorganization process occurred, along with the relevant literature justifying the need for a new service delivery model, and an historical perspective on the planning; implementation; and evaluation phases of the process are described. In the planning phase, the constitution of the working committee, the data collected, and the information found in the literature are presented. Apollo, the new service delivery model, is then described along with each of its components (e.g., community, group, and individual interventions). Actions and lessons learnt during the implementation of each component are presented. We hope by sharing our experiences that we can help others make informed decisions about service reorganization to improve the quality of services provided to children with disabilities, their families, and their communities.

  16. Implementing a gender policy in ACORD: strategies, constraints, and challenges.

    PubMed

    Hadjipateras, A

    1997-02-01

    ACORD, a consortium of 11 nongovernmental organizations from Europe, Asia, and North America devoted to poverty alleviation in Africa, formally adopted a gender policy in 1990 aimed at reducing gender-based inequities in communities where ACORD works. A 1994-96 survey of field programs indicated that the greatest gains for women had been recorded in the areas of welfare, access to resources, conscientization (awareness of and will to alter gender inequalities), and, to a lesser extent, participation; minimal progress was noted in shifting the prevailing gender-based imbalance of power and control in public or private spheres. The research identified several programming and organizational strategies that have promoted positive outcomes for women: gender-awareness training for staff and community members, working with mixed groups, working with women-only groups, promotion of female leadership, gender-aware participatory planning and evaluation, spreading responsibility throughout the organization for implementing the gender policy, recruitment and promotion of women staff, networks for women staff, and direct field involvement in research. Also identified were internal and external factors that weakened policy implementation: a lack of clarity as to its aims, culture-based resistance, confusion regarding responsibilities and procedures, weak accountability mechanisms, lack of gender impact indicators, training inadequacies, underrepresentation of women staff, and inadequate resources. As a result of the review process, ACORD has given gender issues centrality in its current 5-year strategic plan.

  17. Engaging Students in GeoPRISMS Science Planning: Preparing the Leaders of Tomorrow

    NASA Astrophysics Data System (ADS)

    Henning, A. T.; Benoit, M. H.; Marshall, J.; Goodliffe, A. M.; Morgan, J. K.; Bopp, C. J.

    2011-12-01

    GeoPRISMS is the legacy of the NSF MARGINS Program. It is a new decadal program, funded by NSF, committed to the amphibious study of the origin and evolution of continental margins through interdisciplinary, community-based investigations. MARGINS and GeoPRISMS have had notable success in fostering this team-based approach in graduate students who then continue on to become GeoPRISMS PIs. GeoPRISMS is enhancing its student outreach efforts through the development of a student symposium program, in which graduate students are invited to be more active participants in GeoPRISMS workshops, and are provided with valuable background and reference materials to enable them. This approach has been applied and updated at four GeoPRISMS workshops so far: two implementation workshops and two science planning workshops. Graduate students participated in the GeoPRISMS Rift Initiation and Evolution (RIE) implementation workshop in November 2010 and the Subduction Cycles and Deformation (SCD) workshop in January 2011, contributing to the overall design of the GeoPRISMS research program, and the selection of primary sites for study. In addition to participating in the regular meeting activities, students gave "pop-up" presentations to summarize their research and poster presentations and also worked together to develop their own draft implementation plan that was presented to the larger audience. Students responded positively to the experience of drafting their own implementation plans, which fostered a sense of community among participants and created an environment in which students felt comfortable speaking up during the meeting. Scientists attending the workshops were impressed by the students' draft implementation plans, as well as their work ethic and enthusiasm, and felt they made a very positive contribution to the workshops. Student feedback suggested providing students with a better understanding of the main scientific questions addressed at the meeting, as well as possible career paths. The sequestration of students during the workshop also raised concerns that they missed opportunities for broader community interactions. In Fall 2011, students participated in two symposia associated with the GeoPRISMS Alaska and Eastern North American Margin primary site planning workshops. The fall symposia followed a different model based on feedback from the first two workshops. A full day of activities took place prior to the workshop, including short presentations by experts in the field to provide background, a half-day field trip to enhance cohort-building, and student-only poster sessions and discussions. This approach allowed the students to participate fully in the meeting itself, with a stronger base of knowledge about the workshop topics and a larger network of colleagues.

  18. In-service evaluation of major urban arterials with landscaped medians : phase III.

    DOT National Transportation Integrated Search

    2013-06-01

    Several cities have implemented redevelopment plans that include the re-design of major regional arterials in order to raise the quality of life of those living, working, and shopping along, or near the arterial. Many of these redevelopment efforts i...

  19. On the Evolutionary Origins of Executive Functions

    ERIC Educational Resources Information Center

    Ardila, Alfredo

    2008-01-01

    In this paper it is proposed that the prefrontal lobe participates in two closely related but different executive function abilities: (1) "metacognitive executive functions": problem solving, planning, concept formation, strategy development and implementation, controlling attention, working memory, and the like; that is, executive functions as…

  20. E-Learning Systems: Promises and Pitfalls

    ERIC Educational Resources Information Center

    Chan, Carlyle H.; Robbins, Lisa I.

    2006-01-01

    Objective: This review examines the use of e-learning systems in psychiatric education. Method: The authors review the Instructional System Design process, focusing on ADDIE (Analysis, Design, Development, Implementation, and Evaluation). The authors also report on two representative teaching projects, discussing the planning, work, and assessment…

  1. 48 CFR 623.302-70 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Post Occupational Safety and Health Officer during both planning and implementation phases. [59 FR... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Policy. 623.302-70 Section... WORKPLACE Hazardous Material Identification and Material Safety Data 623.302-70 Policy. Any work which...

  2. 48 CFR 623.302-70 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Post Occupational Safety and Health Officer during both planning and implementation phases. [59 FR... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Policy. 623.302-70 Section... WORKPLACE Hazardous Material Identification and Material Safety Data 623.302-70 Policy. Any work which...

  3. Additional cash incentive within a conditional cash transfer scheme: a 'controlled before and during' design evaluation study from India.

    PubMed

    Lahariya, Chandrakant; Mishra, Ashok; Nandan, Deoki; Gautam, Praveen; Gupta, Sanjay

    2011-01-01

    Conditional Cash Transfer (CCT) schemes have shown largely favorable changes in the health seeking behavior. This evaluation study assesses the process and performance of an Additional Cash Incentive (ACI) scheme within an ongoing CCT scheme in India, and document lessons. A controlled before and during design study was conducted in Madhya Pradesh state of India, from August 2007 to March 2008, with increased in institutional deliveries as a primary outcome. In depth interviews, focus group discussions and household surveys were done for data collection. Lack of awareness about ACI scheme amongst general population and beneficiaries, cumbersome cash disbursement procedure, intricate eligibility criteria, extensive paper work, and insufficient focus on community involvement were the major implementation challenges. There were anecdotal reports of political interference and possible scope for corruption. At the end of implementation period, overall rate of institutional deliveries had increased in both target and control populations; however, the differences were not statistically significant. No cause and effect association could be proven by this study. Poor planning and coordination, and lack of public awareness about the scheme resulted in low utilization. Thus, proper IEC and training, detailed implementation plan, orientation training for implementer, sufficient budgetary allocation, and community participation should be an integral part for successful implementation of any such scheme. The lesson learned this evaluation study may be useful in any developing country setting and may be utilized for planning and implementation of any ACI scheme in future.

  4. [Situational profile and intervention strategy in the Mesoamerican region in maternal, neonatal and reproductive health area].

    PubMed

    Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen

    2011-01-01

    To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.

  5. Development and Implementation of the DHAPP Military eHealth Information Network System.

    PubMed

    Kratz, Mary; Thomas, Anne; Hora, Ricardo; Vera, Delphis; Lutz, Mickey; Johnson, Mark D

    2017-01-01

    As the Joint United Nations Programme on HIV/AIDS, the Global Fund, and the US President's Emergency Plan for AIDS Relief focus on reaching 90-90-90 goals, military health systems are scaling up to meet the data demands of these ambitious objectives. Since 2008, the US Department of Defense HIV/AIDS Prevention Program (DHAPP) has been working with military partners in 14 countries on implementation and adoption of a Military eHealth Information Network (MeHIN). Each country implementation plan followed a structured process using international eHealth standards. DHAPP worked with the private sector to develop a commercial-off-the-shelf (COTS) electronic medical record (EMR) for the collection of data, including patient demographic information, clinical notes for general medical care, HIV encounters, voluntary medical male circumcision, and tuberculosis screening information. The COTS software approach provided a zero-dollar software license and focused on sharing a single version of the EMR across countries, so that all countries could benefit from software enhancements and new features over time. DHAPP also worked with the public sector to modify open source disease surveillance tools and open access of HIV training materials. Important lessons highlight challenges to eHealth implementation, including a paucity of technology infrastructure, military leadership rotations, and the need for basic computer skills building. While not simple, eHealth systems can be built and maintained with requisite security, flexibility, and reporting capabilities that provide critical information to improve the health of individuals and organizations. Copyright© Bentham Science Publishers; For any queries, please email at epub@benthamscience.org.

  6. Chemical Hygiene and Safety Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berkner, K.

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through trainingmore » and the Plan will serve as a the framework and reference guide for that training.« less

  7. 77 FR 5191 - Approval and Promulgation of Air Quality Implementation Plans; District of Columbia; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-02

    ... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...

  8. Development of a cooperative operational rendezvous plan for Eureca and other maneuvering Shuttle payloads

    NASA Technical Reports Server (NTRS)

    Gavin, R. T.

    1987-01-01

    This paper discusses the development of a new class of US Space Shuttle rendezvous missions which involve a maneuvering target vehicle. The objective of the analysis was to develop an operational plan to take advantage of the target spacecraft's maneuvering ability by making it responsible for a portion of the maneuvers necessary to achieve rendezvous. This work resulted in the development of a region in space relative to the Shuttle, called the control box, into which the target vehicle maneuvers. Furthermore, a mission operations plan was developed to implement the control box technique.

  9. Why TQM does not work in Iranian healthcare organisations.

    PubMed

    Mosadeghrad, Ali Mohammad

    2014-01-01

    Despite the potential benefits of total quality management (TQM), many healthcare organisations encountered difficulties in its implementation. The purpose of this paper is to explore the barriers to successful implementation of TQM in healthcare organisations of Iran. This study involved a mixed research design. In-depth interviews were conducted with TQM practitioners to explore TQM implementation obstacles in Iranian healthcare organisations. In addition, this study involved survey-based research on the obstacles associated with successful TQM transformation. TQM implementation and its impact depend on the ability of managers to adopt and adapt its values and concepts in professional healthcare organisations. Unsuccessful TQM efforts in Iranian healthcare organisations can be attributed to the non-holistic approach adopted in its implementation, inadequate knowledge of managers' about TQM implementation, frequent top management turnover, poor planning, vague and short-termed improvement goals, lack of consistent managers' and employees' commitment to and involvement in TQM implementation, lack of a corporate quality culture, lack of team orientation, lack of continuous education and training and lack of customer focus. Human resource problems, cultural and strategic problems were the most important obstacles to TQM successful implementation, respectively. Understanding the factors that are likely to obstruct TQM implementation would enable managers to develop more viable strategies for achieving business excellence. Understanding the factors that are likely to obstruct TQM implementation will help organisations in planning better TQM models.

  10. Randomized controlled trial of a health plan-level mood disorders psychosocial intervention for solo or small practices.

    PubMed

    Kilbourne, Amy M; Nord, Kristina M; Kyle, Julia; Van Poppelen, Celeste; Goodrich, David E; Kim, Hyungjin Myra; Eisenberg, Daniel; Un, Hyong; Bauer, Mark S

    2014-01-01

    Mood disorders represent the most expensive mental disorders for employer-based commercial health plans. Collaborative care models are effective in treating chronic physical and mental illnesses at little to no net healthcare cost, but to date have primarily been implemented by larger healthcare organizations in facility-based models. The majority of practices providing commercially insured care are far too small to implement such models. Health plan-level collaborative care treatment can address this unmet need. The goal of this study is to implement at the national commercial health plan level a collaborative care model to improve outcomes for persons with mood disorders. A randomized controlled trial of a collaborative care model versus usual care will be conducted among beneficiaries of a large national health plan from across the country seen by primary care or behavioral health practices. At discharge 344 patients identified by health plan claims as hospitalized for unipolar depression or bipolar disorder will be randomized to receive collaborative care (patient phone-based self-management support, care management, and guideline dissemination to practices delivered by a plan-level care manager) or usual care from their provider. Primary outcomes are changes in mood symptoms and mental health-related quality of life at 12 months. Secondary outcomes include rehospitalization, receipt of guideline-concordant care, and work productivity. This study will determine whether a collaborative care model for mood disorders delivered at the national health plan level improves outcomes compared to usual care, and will inform a business case for collaborative care models for these settings that can reach patients wherever they receive treatment. ClinicalTrials.gov Identifier: NCT02041962; registered January 3, 2014.

  11. The effect of the federal Family and Medical Leave Act upon employee benefits.

    PubMed

    Brislin, J A

    1993-09-01

    FMLA will substantially influence the administration of employee benefits. The plan sponsor, trustees, plan administrator and collective bargaining parties must make a number of policy decisions. These include employer reporting and contribution procedures, settlement of eligibility questions, delinquency procedures, coordination with COBRA, substitution of vacation and sick leave rights and procedures, restrictions on participants working during leave, procedures for the non-forfeiture of accrued benefits and restoration of benefits. After the policy decisions are made and the procedures are established, the proper notices and caveats must be communicated to plan participants, and the plan must update the SPD. Each of the policy decisions, administrative procedures and participant communications must be carefully thought out before implementation. Plan sponsors, trustees and plan administrators should seek the help, advice and assistance of the plan's professional advisers.

  12. The effectiveness of national strategic guidelines at a local level: a case study of the UK general aviation industry

    NASA Astrophysics Data System (ADS)

    Lober, Terence

    The thesis is concerned with the prospects for reducing strategic-local tensions in the British planning process. It examines the conflicts surrounding small general aviation aerodromes as a means of understanding these tensions, why they have evolved, and if they might be reconciled through planning reform. The only prior academic research to have touched upon this issue through general aviation has been an ESRC funded project undertaken by Gallent and colleagues (1999), who found aerodromes provided a microcosm of planning's issues. Building on this work, the thesis develops what is meant by strategic-local tensions, which in broad terms are described as differences between national and regional guidance/plans and what actually takes place locally. Moving from a basic research question it develops a wide planning perspective based on the literature by discussing the meaning of planning, its history and issues for example, how conflicts in planning might be influenced by the broader socio-political environment. The thesis then arrives at three hypotheses which question the effectiveness of the existing strategic guideline implementation process, develops a local planning authority framework and addresses issues of reflectivity and bias. Results from three national surveys of pilots, aerodromes and manufacturers, plus longitudinal analysis of government and other datasets, are then used to detail a comprehensive and unique description of general aviation, which includes a costing based account of the direct expenditure of flying activity. This provides a substantive foundation for a local planning authority survey which both extends previous boundaries and enables the process of implementing strategic objectives to be disaggregated and evaluated. Field visits to twenty six aerodromes and five local authorities are subsequently used to explore gaps within the strategic implementation process and to develop conclusions, within the wider landscape of planning, about the nature of strategic local tensions and implications for planning reform.

  13. Efficiency in Rule- vs. Plan-Based Movements Is Modulated by Action-Mode.

    PubMed

    Scheib, Jean P P; Stoll, Sarah; Thürmer, J Lukas; Randerath, Jennifer

    2018-01-01

    The rule/plan motor cognition (RPMC) paradigm elicits visually indistinguishable motor outputs, resulting from either plan- or rule-based action-selection, using a combination of essentially interchangeable stimuli. Previous implementations of the RPMC paradigm have used pantomimed movements to compare plan- vs. rule-based action-selection. In the present work we attempt to determine the generalizability of previous RPMC findings to real object interaction by use of a grasp-to-rotate task. In the plan task, participants had to use prospective planning to achieve a comfortable post-handle rotation hand posture. The rule task used implementation intentions (if-then rules) leading to the same comfortable end-state. In Experiment A, we compare RPMC performance of 16 healthy participants in pantomime and real object conditions of the experiment, within-subjects. Higher processing efficiency of rule- vs. plan-based action-selection was supported by diffusion model analysis. Results show a significant response-time increase in the pantomime condition compared to the real object condition and a greater response-time advantage of rule-based vs. plan-based actions in the pantomime compared to the real object condition. In Experiment B, 24 healthy participants performed the real object RPMC task in a task switching vs. a blocked condition. Results indicate that plan-based action-selection leads to longer response-times and less efficient information processing than rule-based action-selection in line with previous RPMC findings derived from the pantomime action-mode. Particularly in the task switching mode, responses were faster in the rule compared to the plan task suggesting a modulating influence of cognitive load. Overall, results suggest an advantage of rule-based action-selection over plan-based action-selection; whereby differential mechanisms appear to be involved depending on the action-mode. We propose that cognitive load is a factor that modulates the advantageous effect of implementation intentions in motor cognition on different levels as illustrated by the varying speed advantages and the variation in diffusion parameters per action-mode or condition, respectively.

  14. Public health terminology: Hindrance to a Health in All Policies approach?

    PubMed

    Synnevåg, Ellen S; Amdam, Roar; Fosse, Elisabeth

    2018-02-01

    National public health policies in Norway are based on a Health in All Policies (HiAP) approach. At the local level, this means that public health, as a cross-sectional responsibility, should be implemented in all municipal sectors by integrating public health policies in municipal planning and management systems. The paper investigates these local processes, focusing on the use of public health terminology and how this terminology is translated from national to local contexts. We ask whether the terms 'public health' and 'public health work' are suitable when implementing an HiAP approach. A qualitative case study based on analyses of interviews and planning documents was performed in three Norwegian municipalities. The results present dilemmas associated with using public health terminology when implementing an HiAP approach. On the one hand, the terms are experienced as wide, complex, advanced and unnecessary. On the other hand, the terms are experienced as important for a systematic approach towards understanding public health ideology and cross-sectional responsibility. One municipality used alternative terminology. This paper promotes debate about the appropriateness of using the terms 'public health' and 'public health work' at the local level. It suggests that adaptation is suitable and necessary, unless it compromises knowledge, responsibility and a systematic approach. This study concludes that the use of terminology is a central factor when implementing the Norwegian Public Health Act at the local level.

  15. The school health index as an impetus for change.

    PubMed

    Staten, Lisa K; Teufel-Shone, Nicolette I; Steinfelt, Victoria E; Ortega, Nohemi; Halverson, Karen; Flores, Carmen; Lebowitz, Michael D

    2005-01-01

    The increase in childhood obesity and prevalence of chronic disease risk factors demonstrate the importance of creating healthy school environments. As part of the Border Health Strategic Initiative, the School Health Index was implemented in public schools in two counties along the Arizona, United States-Sonora, Mexico border. Developed in 2000 by the Centers for Disease Control and Prevention, the School Health Index offers a guide to assist schools in evaluating and improving opportunities for physical activity and good nutrition for their students. Between 2000 and 2003, a total of 13 schools from five school districts in two counties participated in the School Health Index project despite academic pressures and limited resources. The Border Health Strategic Initiative supported the hiring and training of an external coordinator in each county who was not part of the school system but who was an employee in an established community-based organization. The coordinators worked with the schools to implement the School Health Index, to develop action plans, and to monitor progress toward these goals. The School Health Index process and school team participation varied from school to school. Individual plans were different but all focused on reducing in-school access to unhealthy foods, identified as high-fat and/or of low nutritional value. Ideas for acting on this focus ranged from changing the content of school lunches to discontinuing the use of nonnutritious foods as classroom rewards. All plans included recommendations that could be implemented immediately as well as those that would require planning and perhaps the formation and assistance of a subcommittee (e.g., for developing or adopting a district-wide health curriculum). After working with the School Health Index, most schools made at least one immediate change in their school environments. The external coordinator was essential to keeping the School Health Index results and action plans on the agendas of school administrators, especially during periods of staff turnover. Staff turnover, lack of time, and limited resources resulted in few schools achieving longer-term policy changes.

  16. Intervention mapping for development of a participatory return-to-work intervention for temporary agency workers and unemployed workers sick-listed due to musculoskeletal disorders

    PubMed Central

    Vermeulen, Sylvia J; Anema, Johannes R; Schellart, Antonius JM; van Mechelen, Willem; van der Beek, Allard J

    2009-01-01

    Background In the past decade in activities aiming at return-to-work (RTW), there has been a growing awareness to change the focus from sickness and work disability to recovery and work ability. To date, this process in occupational health care (OHC) has mainly been directed towards employees. However, within the working population there are two vulnerable groups: temporary agency workers and unemployed workers, since they have no workplace/employer to return to, when sick-listed. For this group there is a need for tailored RTW strategies and interventions. Therefore, this paper aims to describe the structured and stepwise process of development, implementation and evaluation of a theory- and practise-based participatory RTW program for temporary agency workers and unemployed workers, sick-listed due to musculoskeletal disorders (MSD). This program is based on the already developed and cost-effective RTW program for employees, sick-listed due to low back pain. Methods The Intervention Mapping (IM) protocol was used to develop a tailor-made RTW program for temporary agency workers and unemployed workers, sick-listed due to MSD. The Attitude-Social influence-self-Efficacy (ASE) model was used as a theoretical framework for determinants of behaviour regarding RTW of the sick-listed worker and development of the intervention. To ensure participation and facilitate successful adoption and implementation, important stakeholders were involved in all steps of program development and implementation. Results of semi-structured interviews and 'fine-tuning' meetings were used to design the final participatory RTW program. Results A structured stepwise RTW program was developed, aimed at making a consensus-based RTW implementation plan. The new program starts with identifying obstacles for RTW, followed by a brainstorm session in which the sick-listed worker and the labour expert of the Social Security Agency (SSA) formulate solutions/possibilities for suitable (therapeutic) work. This process is guided by an independent RTW coordinator to achieve consensus. Based on the resulting RTW implementation plan, to create an actual RTW perspective, a vocational rehabilitation agency is assigned to find a matching (therapeutic) workplace. The cost-effectiveness of this participatory RTW program will be evaluated in a randomised controlled trial. Conclusion IM is a promising tool for the development of tailor-made OHC interventions for the vulnerable working population. PMID:19573229

  17. Sitewide monitoring at Agra, Kansas, June 2009.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, L. M.; Environmental Science Division

    In 1985, carbon tetrachloride was discovered in the groundwater at Agra, Kansas, during routine sampling of public water supply wells. Two of Agra's four public water supply wells contained low but detectable levels of carbon tetrachloride; the concentrations in wells PWS-3 and PWS-4 exceeded the maximum contaminant level. These wells were removed from service in 1986, although they remain available for uses other than drinking water. Other public wells, outside the area of contamination, supply drinking water for the city of Agra. In 1987-2005, the Kansas Department of Health and Environment (KDHE) and the Commodity Credit Corporation of the U.S.more » Department of Agriculture (CCC/USDA) conducted investigations to delineate the contaminant plume and to identify source areas for the contamination - which results from the past use of grain fumigants containing carbon tetrachloride. Source areas were identified on the former CCC/USDA grain storage facility property and on the Producers Agricultural Marketing Association, Inc., property located to the south (Argonne 2006). The contaminant plume extends to the southeast, toward well PWS-3, from the identified source areas. Both the CCC/USDA and Pro-Ag Marketing are currently implementing KDHE-approved interim measures (IMs). To address the contamination identified on its former property, the CCC/USDA is implementing a source control IM consisting of large-diameter boreholes (LDBs) coupled with soil vapor extraction (SVE) and air sparging (AS). Pro-Ag Marketing plans to use groundwater extraction to address the downgradient plume. The CCC/USDA and Pro-Ag completed installation of the two interim measures in May 2009 and August 2009, respectively. The performance and assessments of the effectiveness of the IMs are being reported separately by the responsible entities. As part of the IM process, the KDHE (2008) requested the development of a joint sitewide groundwater monitoring plan to allow periodic assessment of the effectiveness of the separate IMs being implemented by the CCC/USDA and Pro-Ag, through monitoring of the level of contamination and the resulting change in both the extent and internal configuration of the downgradient plume. A Joint Work Plan for Sitewide Monitoring was developed by the CCC/USDA through its technical consultant, Argonne National Laboratory, and was reviewed, approved, and signed by Pro-Ag Marketing and subsequently submitted to the KDHE on May 12, 2009. The KDHE (2009a) provided comments on the Joint Work Plan on May 27, 2009, requesting submission of a revised version. To minimize delays, the KDHE allowed the CCC/USDA to proceed with the scheduled annual sampling proposed in the Joint Work Plan. The sampling was to be conducted according to the previously approved low-flow sampling methodology (Argonne 2009). Argonne conducted the first annual sampling event for the CCC/USDA on June 15-16, 2009. The finalized, signed version of the Joint Work Plan provided to the KDHE on November 9, 2009, is in Appendix A. Table 1.1 lists the monitoring and public water supply wells to be sampled under the Joint Work Plan, plus the wells being sampled to monitor the respective IMs. The entity responsible for each monitoring element is indicated, along with well completion dates and well registration numbers. The subject of this report is the initial sitewide groundwater sampling event that occurred on June 15-16, 2009, under the Joint Work Plan.« less

  18. National Ignition Facility quality assurance program plan revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolfe, C R

    1998-06-01

    NIF Project activities will be conducted in a manner consistent with the guidance and direction of the DOE Order on Quality Assurance (414.1), the LLNL QA Program, and the Laser Directorate QA Plan. Quality assurance criteria will be applied in a graded manner to achieve a balance between the rigor of application of QA measures and the scale, cost, and complexity of the work involved. Accountability for quality is everyone's, extending from the Project Manager through established lines of authority to all Project personnel, who are responsible for the requisite quality of their own work. The NLF QA Program willmore » be implemented by personnel conducting their activities to meet requirements and expectations, according to established plans and procedures that reflect the way business is to be conducted on the Project.« less

  19. Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, M.; Archer, B.; Hendrickson, B.

    2015-08-27

    The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less

  20. Integrated Workforce Planning Model: A Proof of Concept

    NASA Technical Reports Server (NTRS)

    Guruvadoo, Eranna K.

    2001-01-01

    Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.

  1. Toward an Evaluation Framework for Doctoral Education in Social Work: A 10-Year Retrospective of One PhD Program's Assessment Experiences

    ERIC Educational Resources Information Center

    Bentley, Kia J.

    2013-01-01

    This article presents a framework for evaluation in social work doctoral education and details 10 years of successes and challenges in one PhD program's use of the framework, including planning and implementing specific assessment activities around student learning outcomes and larger program goals. The article argues that a range of…

  2. Migrant and Seasonal Hired Adolescent Farmworkers: A Plan To Improve Working Conditions. Recommendations from the National Adolescent Farmworker Occupational Health and Safety Advisory Committee.

    ERIC Educational Resources Information Center

    Vela Acosta, Martha, Ed.; Lee, Barbara, Ed.

    Agriculture is the second most common employer of youth and is associated with numerous occupational hazards, but few preventive efforts to protect adolescent farmworkers have been implemented or evaluated. The largest group of adolescent farmworkers is youth who live away from their natural families and migrate, mostly from Mexico, to work in…

  3. Planning for Adaptation to Climate Change in the City of Chicago

    NASA Astrophysics Data System (ADS)

    Wuebbles, D. J.; Hayhoe, K.; Coffee, J.; McGraw, J.; Parzen, J.

    2008-12-01

    Under Mayor Richard M. Daley's leadership, the City of Chicago initiated the Chicago Climate Action Plan (CCAP) to better understand local implications of global climate change in both higher and lower emissions scenarios, reduce greenhouse gas emissions, and implement programs to build future climate change resilience. The City approached this work not only as a way to make Chicago more adaptable in the future, but also to improve Chicago's quality of life today. The Chicago Climate Action Plan adopted stresses the importance of both reducing greenhouse gas emissions in Chicago and preparing for climate changes that may be unavoidable. Building off of the City's significant environmental programs and projects, and based on our analyses of the climate effects and impacts that improved the scientific understanding of future climate change impacts on Chicago, the City then developed a set of climate change adaptation strategies, resulting in the City of Chicago Climate Change Adaptation Summary. This document includes prioritization of climate change adaptations based on relative risk as well as framework strategies for those tactics categorized as "must do/early action." In early 2008, The Mayor's Office asked five Commissioners from its Green Steering Committee to chair adaptation work groups including: extreme heat; extreme precipitation; buildings, infrastructure and equipment; ecosystems; and leadership, planning and communications. Working with staff from relevant departments, sister agencies and other stakeholders, these work groups developed 39 basic adaptation work plans, including plans for enhancing the City's existing projects and programs that relate to climate change adaptation. Climate change adaptation work will be on-going in City Departments under the Mayor's Office leadership. The City intends to continually monitor and improve its response to climate change, resulting in an improved quality of life for Chicago residents.

  4. 75 FR 38850 - NNI Strategic Plan 2010; Request for Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... implements strategies that maximize the economic benefits of its investments in nanotechnology, based on... innovation strategy, NNI member agencies have identified areas ripe for significant advances through closer... human health, resulting in better risk assessment and risk mitigation strategies. Each center works as a...

  5. 75 FR 60471 - Statement of Organization, Functions, and Delegations of Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... support for working families and improving the quality of child care to promote healthy development... child care programs authorized under the Child Care and Development Block Grant (CCDBG) Act and section...; identifies and implements operational planning objectives and initiatives related to child care; provides...

  6. LIGHTWEIGHT GREEN ROOF WATER RETENTION SYSTEM

    EPA Science Inventory

    During Phase I, we have forged numerous necessary partnerships, which will allow us to begin our implementation tests. Working with the Philadelphia Water Department (PWD) and Drexel Smart House (DSH) we have 3 to 4 prime test sites for our system. We plan to execute our insta...

  7. Stream On: Video Servers in the Real World.

    ERIC Educational Resources Information Center

    Tristram, Claire

    1995-01-01

    Despite plans for corporate training networks, digital ad-insertion systems, hotel video-on-demand, and interactive television, only small scale video networks presently work. Four case studies examine the design and implementation decisions for different markets: corporate; advertising; hotel; and commercial video via cable, satellite or…

  8. The art of appropriate evaluation : a guide for highway safety program managers

    DOT National Transportation Integrated Search

    1999-05-01

    This Guide provides an overview of the steps that are involved in program evaluations and gets you thinking about how these steps fit into your implementation plans. It also provides some handy suggestions on how to find and work with an evaluation c...

  9. The new final Clinical Skills examination in human medicine in Switzerland: Essential steps of exam development, implementation and evaluation, and central insights from the perspective of the national Working Group

    PubMed Central

    Berendonk, Christoph; Schirlo, Christian; Balestra, Gianmarco; Bonvin, Raphael; Feller, Sabine; Huber, Philippe; Jünger, Ernst; Monti, Matteo; Schnabel, Kai; Beyeler, Christine; Guttormsen, Sissel; Huwendiek, Sören

    2015-01-01

    Objective: Since 2011, the new national final examination in human medicine has been implemented in Switzerland, with a structured clinical-practical part in the OSCE format. From the perspective of the national Working Group, the current article describes the essential steps in the development, implementation and evaluation of the Federal Licensing Examination Clinical Skills (FLE CS) as well as the applied quality assurance measures. Finally, central insights gained from the last years are presented. Methods: Based on the principles of action research, the FLE CS is in a constant state of further development. On the foundation of systematically documented experiences from previous years, in the Working Group, unresolved questions are discussed and resulting solution approaches are substantiated (planning), implemented in the examination (implementation) and subsequently evaluated (reflection). The presented results are the product of this iterative procedure. Results: The FLE CS is created by experts from all faculties and subject areas in a multistage process. The examination is administered in German and French on a decentralised basis and consists of twelve interdisciplinary stations per candidate. As important quality assurance measures, the national Review Board (content validation) and the meetings of the standardised patient trainers (standardisation) have proven worthwhile. The statistical analyses show good measurement reliability and support the construct validity of the examination. Among the central insights of the past years, it has been established that the consistent implementation of the principles of action research contributes to the successful further development of the examination. Conclusion: The centrally coordinated, collaborative-iterative process, incorporating experts from all faculties, makes a fundamental contribution to the quality of the FLE CS. The processes and insights presented here can be useful for others planning a similar undertaking. PMID:26483853

  10. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  11. 77 FR 41279 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280

  12. 76 FR 12945 - Instructions for Implementing Climate Change Adaptation Planning in Accordance With Executive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning... Availability of Climate Change Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council... for Implementing Climate Change Adaptation Planning are now available at: http://www.whitehouse.gov...

  13. Barriers to the implementation of research perceived by nurses from Osakidetza.

    PubMed

    Cidoncha-Moreno, M Ángeles; Ruíz de Alegría-Fernandez de Retana, Begoña

    To understand the barriers to implementing nursing research findings into practice, as perceived by the nurses working in Osakidetza and to analyze if the workplace factor and time worked affect the perception of these barriers. Cross-sectional study. BARRIERS Scale questionnaire was given to a representative sample of 1,572 Basque Health Service nurses, stratified and randomized, according to scope of work and job responsibility (response rate: 43.76%). According to the research results, the first important barrier was "insufficient time on the job to implement new ideas". Nurses have perceived the organizational factor as the most important barrier in their practice. Nurses in "Special hospital departments" perceived more barriers in the "quality of research" factor than those working in "Primary Care". Years of service showed a slight influence. The nurses stated that external factors related to the organization principally interfered in implementing results into clinical practice. They placed lack of critical reading training second. Working environment and seniority mark differences in the perception of barriers. This study may help to develop strategies for planning training programs to facilitate the use of research in clinical practice, in order to provide quality care. Copyright © 2017 Elsevier España, S.L.U. All rights reserved.

  14. 40 CFR 52.672 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.672 Approval of plans. (a) Carbon Monoxide. (1) EPA approves as a revision to the Idaho State Implementation Plan, the Limited Maintenance Plan for.... [Reserved] (e) Particulate Matter. (1) EPA approves as a revision to the Idaho State Implementation Plan...

  15. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  16. WastePlan model implementation for New York State. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Visalli, J.R.; Blackman, D.A.

    1995-07-01

    WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less

  17. Motion Planning in a Society of Intelligent Mobile Agents

    NASA Technical Reports Server (NTRS)

    Esterline, Albert C.; Shafto, Michael (Technical Monitor)

    2002-01-01

    The majority of the work on this grant involved formal modeling of human-computer integration. We conceptualize computer resources as a multiagent system so that these resources and human collaborators may be modeled uniformly. In previous work we had used modal for this uniform modeling, and we had developed a process-algebraic agent abstraction. In this work, we applied this abstraction (using CSP) in uniformly modeling agents and users, which allowed us to use tools for investigating CSP models. This work revealed the power of, process-algebraic handshakes in modeling face-to-face conversation. We also investigated specifications of human-computer systems in the style of algebraic specification. This involved specifying the common knowledge required for coordination and process-algebraic patterns of communication actions intended to establish the common knowledge. We investigated the conditions for agents endowed with perception to gain common knowledge and implemented a prototype neural-network system that allows agents to detect when such conditions hold. The literature on multiagent systems conceptualizes communication actions as speech acts. We implemented a prototype system that infers the deontic effects (obligations, permissions, prohibitions) of speech acts and detects violations of these effects. A prototype distributed system was developed that allows users to collaborate in moving proxy agents; it was designed to exploit handshakes and common knowledge Finally. in work carried over from a previous NASA ARC grant, about fifteen undergraduates developed and presented projects on multiagent motion planning.

  18. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  19. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...

  20. 78 FR 68005 - Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...

  1. Effective protection of open space: does planning matter?

    PubMed

    Steelman, Toddi A; Hess, George R

    2009-07-01

    High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.

  2. Reporting guidelines for implementation and operational research.

    PubMed

    Hales, Simon; Lesher-Trevino, Ana; Ford, Nathan; Maher, Dermot; Ramsay, Andrew; Tran, Nhan

    2016-01-01

    In public health, implementation research is done to improve access to interventions that have been shown to work but have not reached many of the people who could benefit from them. Researchers identify practical problems facing public health programmes and aim to find solutions that improve health outcomes. In operational research, routinely-collected programme data are used to uncover ways of delivering more effective, efficient and equitable health care. As implementation research can address many types of questions, many research designs may be appropriate. Existing reporting guidelines partially cover the methods used in implementation and operational research, so we ran a consultation through the World Health Organization (WHO), the Alliance for Health Policy & Systems Research (AHPSR) and the Special Programme for Research and Training in Tropical Diseases (TDR) and developed guidelines to facilitate the funding, conduct, review and publishing of such studies. Our intention is to provide a practical reference for funders, researchers, policymakers, implementers, reviewers and editors working with implementation and operational research. This is an evolving field, so we plan to monitor the use of these guidelines and develop future versions as required.

  3. Contingency plan implementation.

    PubMed

    Neurath, D; Cober, N; Owens, W; Giulivi, A

    2012-06-01

    Although the National blood system in Canada reduces the risk of inventory shortages the possibility of a blood supply shortage still exists. The Ontario Ministry of Health and Long-Term Care developed a provincial plan to manage blood transfusion needs and inventory in the event of a National blood shortage. The Ontario plan was developed to align with the National plan as well as other provincial plans in order to ensure consistency in blood management strategies across the country. The Ontario plan was released in 2008, along with a toolkit to aid hospitals in developing their facility specific plans. In the Champlain region of Ontario, a group of 16 hospitals worked collaboratively to develop a regional blood shortage plan. A provincial blood shortage simulation exercise was held in 2010 to test out these plans. The Director of Transfusion Medicine of the largest facility in the group of 16 hospitals (The Ottawa Hospital) took the lead in the development of the regional blood shortage management plan. Working groups from all 16 sites contributed to the plan development. The proposed plan was presented to the Medical Advisory Committee for approval. The plan consists of activities relating to the severity of the supply shortage as defined by Amber, Red, Recovery and Green phases. The plan includes a communication plan for notifying stakeholders including patients whose treatment may be affected. Inventory management and triage guidelines are provided to reduce the demand for blood and to conserve inventory for those patients whose need is prioritized as highest. The regional blood shortage management plan was tested successfully during the provincial simulation exercise. Where regional hospitals work together to provide healthcare, it is beneficial to develop a standardized plan to provide guidance to hospital personnel in response to a blood supply shortage. A consistent plan will ensure patient care is provided in a consistent manner across a health region. Mock or simulation exercises can aid in testing plans and raising the awareness of stakeholders. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  5. Hospital culture--why create one?

    PubMed

    Sovie, M D

    1993-01-01

    Hospitals, to survive, must be transformed into responsive, participative organizations capable of new practices that produce improved results in both quality of care and service at reduced costs. Creating, managing, and changing the culture are critical leadership functions that will enable the hospital to succeed. Strategic planning and effective implementation of planned change will produce the desired culture. Work restructuring, a focus on quality management along with changes in clinical practices, as well as the care and support processes, are all a part of the necessary hospital cultural revolution.

  6. GlobPermafrost- How Space-BasedEarth Observation Supports Understanding of Permafrost

    NASA Astrophysics Data System (ADS)

    Bartsch, Annett; Grosse, Guido; Kaab, Andreas; Westermann, Sebastian; Strozzi, Tazio; Wiesmann, Andreas; Duguay, Claude; Seifert, Frank Martin; Obu, Jaroslav; Goler, Robert

    2016-08-01

    The GlobPermafrost project develops, validates and implements Earth Observation (EO) products to support research communities and international organisations in their work on better understanding permafrost characteristics and dynamics. To facilitate usability of these products by the target audience, user requirements with respect to the planned products have been requested and collected through an online community survey as well as by interview. This paper provides an overview on the planned thematic EO products as well as results of the user requirement survey.

  7. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional... given the uncertainties in the electrical market in Arizona, EPA is proposing to extend the date by...

  8. How to achieve the desired outcomes of advance care planning in nursing homes: a theory of change.

    PubMed

    Gilissen, J; Pivodic, L; Gastmans, C; Vander Stichele, R; Deliens, L; Breuer, E; Van den Block, L

    2018-02-14

    Advance care planning (ACP) has been identified as particularly relevant for nursing home residents, but it remains unclear how or under what circumstances ACP works and can best be implemented in such settings. We aimed to develop a theory that outlines the hypothetical causal pathway of ACP in nursing homes, i.e. what changes are expected, by means of which processes and under what circumstances. The Theory of Change approach is a participatory method of programme design and evaluation whose underlying intention is to improve understanding of how and why a programme works. It results in a Theory of Change map that visually represents how, why and under what circumstances ACP is expected to work in nursing home settings in Belgium. Using this approach, we integrated the results of two workshops with stakeholders (n = 27) with the results of a contextual analysis and a systematic literature review. We identified two long-term outcomes that ACP can achieve: to improve the correspondence between residents’ wishes and the care/treatment they receive and to make sure residents and their family feel involved in planning their future care and are confident their care will be according to their wishes. Besides willingness on the part of nursing home management to implement ACP and act accordingly, other necessary preconditions are identified and put in chronological order. These preconditions serve as precursors to, or requirements for, accomplishing successful ACP. Nine original key intervention components with specific rationales are identified at several levels (resident/family, staff or nursing home) to target the preconditions: selection of a trainer, ensuring engagement by management, training ACP reference persons, in-service education for healthcare staff, information for staff, general practitioners, residents and their family, ACP conversations and documentation, regular reflection sessions, multidisciplinary meetings, and formal monitoring. The Theory of Change map presented here illustrates a theory of how ACP is expected to work in order to achieve its desired long-term outcomes while highlighting organisational factors that potentially facilitate the implementation and sustainability of ACP. We provide the first comprehensive rationale of how ACP is expected to work in nursing homes, something that has been called for repeatedly.

  9. 78 FR 40654 - Approval, Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ..., Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public Hearings AGENCY: Environmental...) addressing regional haze under. We are making this change in response to letters submitted by the Governor of...

  10. 78 FR 78310 - Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...

  11. 77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...

  12. 78 FR 30770 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...

  13. LANL Safety Conscious Work Environment (SCWE) Self-Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hargis, Barbara C.

    2014-01-29

    On December 21, 2012 Secretary of Energy Chu transmitted to the Defense Nuclear Facilities Safety Board (DNFSB) revised commitments on the implementation plan for Safety Culture at the Waste Treatment and Immobilization Plant. Action 2-5 was revised to require contractors and federal organizations to complete Safety Conscious Work Environment (SCWE) selfassessments and provide reports to the appropriate U.S. Department of Energy (DOE) - Headquarters Program Office by September 2013. Los Alamos National Laboratory (LANL) planned and conducted a Safety Conscious Work Environment (SCWE) Self-Assessment over the time period July through August, 2013 in accordance with the SCWE Self-Assessment Guidance providedmore » by DOE. Significant field work was conducted over the 2-week period August 5-16, 2013. The purpose of the self-assessment was to evaluate whether programs and processes associated with a SCWE are in place and whether they are effective in supporting and promoting a SCWE.« less

  14. What Is Plan B? Using Foucault's Archaeology to Enhance Policy Analysis

    ERIC Educational Resources Information Center

    Bourke, Terri; Lidstone, John

    2015-01-01

    Many governments in Western democracies conduct the work of leading their societies forward through policy generation and implementation. Despite government attempts at extensive negotiation, collaboration and debate, the general populace in these same countries frequently express feelings of disempowerment and undue pressure to be compliant,…

  15. The ABE/AMH Manual. An Instructional Guide for ABE Programs Serving Mentally Handicapped Adults.

    ERIC Educational Resources Information Center

    Lehman, Scott C.; Edgar, S. Keith

    This handbook provides adult basic education teachers with instructional materials for working with adult mentally handicapped students. Section 1 examines planning programs for adult mentally retarded students (getting started, specific considerations, various kinds of program sites) and implementing instruction (staff selection and training).…

  16. Inviting the "Outsiders" In: Local Efforts to Improve Adjunct Working Conditions

    ERIC Educational Resources Information Center

    Schreyer, Jessica

    2012-01-01

    An adjunct turned writing program administrator reflects on her professional journey and describes efforts to improve the teaching environment amongst composition faculty--primarily part-time--within her department. Based on a local program review, a pilot faculty relations plan was implemented that addressed two major areas: offering more…

  17. Challenge of Effective Technology Integration into Teaching and Learning

    ERIC Educational Resources Information Center

    Ramorola, M. Z.

    2013-01-01

    South African teachers are faced with challenges in integrating technology effectively into a coherent framework at school level. There seems to be little evidence of technology integration into classroom activities such as systematic planning and implementation of lessons that require learners to think critically, work collaboratively, and use…

  18. Combat Ready Crew Performance Measurement System. Phase IIID. Specifications and Implementation Plan

    DTIC Science & Technology

    1974-12-01

    CONTRACT OR GRANT NUMSERf»; F41609-7 l-C-0008 10 PROGRAM ELEMENT, PROJECT, TASK AREA a WORK UNIT NUMBERS 11230101 12. REPORT DATE...the alteratives should be reconsidered. Software, like Disneyland shoSd never be complete as long as there is creative imagination. Historically

  19. Inclusive Classes in Physical Education: Teachers' Difficulties

    ERIC Educational Resources Information Center

    Toloi, Gabriela Gallucci; Manzini, Eduardo José; Spoldaro, Diego Machado; Zacarias, Lucas Ventura

    2016-01-01

    The successful inclusion of students with special needs in physical education classes requires much planning and preparation. Lack of preparation of physical education teachers working in inclusive settings in Brazil has demonstrated the need for specialized training in strategies for implementing inclusion. The goal of this study was to identify,…

  20. Organinzing the Curriculum Storage in a Preschool/Child Care Environment.

    ERIC Educational Resources Information Center

    Cutler, Kay M.

    2000-01-01

    A preschool staff project was undertaken to develop and implement a more efficient curriculum organization plan and curriculum rotation system. The aim of the project was to provide a healthier working environment by improving communication among the teaching team, organizing curriculum storage outside the classroom, designing curriculum rotation…

  1. Managing Your Reading Program--A Total System.

    ERIC Educational Resources Information Center

    Hales, Carma M.; Jones, Maurine E.

    This guide provides specific information on designing and implementing a reading program. The guide is divided into the following six parts: (1) "Planning for Instruction," including sections on setting ideal goals, establishing a "reality base," and organizing a work flow; (2) "Content Organization," including sections on the structure of…

  2. An Undergraduate Information Security Program: More than a Curriculum

    ERIC Educational Resources Information Center

    Woodward, Belle; Imboden, Thomas; Martin, Nancy L.

    2013-01-01

    This paper describes the implementation of an information security program at a large Midwestern university. The initial work is briefly summarized and improvements that have occurred over time are described. Current activities and future plans are discussed. This paper offers insight and lessons learned for organizations that have or are…

  3. Use of electrical resistivity to detect underground mine voids in Ohio : research implementation plan.

    DOT National Transportation Integrated Search

    2005-09-01

    This project was a natural extension of the 1996-1997 void detection work completed by the USGS for : ODOT. This earlier project was entitled Detection of Underground Mine Voids in Ohio by Use of : Geophysical Methods and was published as U. S....

  4. 76 FR 51463 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-18

    ... territory. Specifically, this petition is made in connection with the implementation of PATH's Automatic Train Control (ATC) project and the plan to use unequipped PA-4 cars as maintenance-of-way (MOW) work... control (CBTC) technology throughout the PATH rail network, as described in the Positive Train Control...

  5. Against the Odds: Professional Development and Innovation under Less-than-Ideal Conditions.

    ERIC Educational Resources Information Center

    Hunter, Beverly

    2001-01-01

    Reports accomplishments of teachers who overcame obstacles to create innovative learning opportunities using electronic technologies. Summarizes findings of a research project conducted by Department of Defense Education Activity schools with teachers who worked in small teams to plan, implement, and evaluate innovative practices and used Vanguard…

  6. Katie Contos | NREL

    Science.gov Websites

    Katie Contos Photo of Katie Contos Katie Contos Project Controller Katie.Contos@nrel.gov | 303-384 -7386 Katie joined NREL in 2012. As a Project Administrator in the Integrated Applications Center, Katie works with a variety of project leaders and teams in project management, planning, implementation

  7. Experiential Learning through Integrated Project Work: An Example from Soil Science.

    ERIC Educational Resources Information Center

    Mellor, Antony

    1991-01-01

    Describes the planning, implementation, and evaluation of an integrated student soil science project. Reports that the course was designed to develop student-centered approaches to learning and to develop transferable skills and personal qualities at the same time. Explains that the project included fieldwork, laboratory analysis, data…

  8. 76 FR 76151 - Notice of Submission for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Evaluation Systems in the United States will contribute to the Department's work by providing research-based information to aid state and local efforts to plan and implement comprehensive teacher evaluation systems. The... United States. OMB Control Number: Pending. Agency Form Number(s): N/A. Frequency of Responses: Annually...

  9. Communication Is Key to Common Core

    ERIC Educational Resources Information Center

    Maunsell, Patricia A.

    2014-01-01

    States, districts, and schools must work to develop effective implementation and communications plans around the Common Core State Standards and aligned assessments. The Education Trust commissioned research on the communication of changes to state assessments in the recent past and lessons learned from that effort identify key elements of an…

  10. District Leadership Supporting PLC Implementation in a Rapid Growth District

    ERIC Educational Resources Information Center

    Tinsley, Laurie

    2016-01-01

    A growing body of work has emerged regarding the responsibilities required of district leaders in establishing plans that initiate and create conditions for sustainability of continuous improvement achieved through a systemic reform structure such as professional learning communities. However, limited research exists in respect to sustaining…

  11. 40 CFR 262.102 - What special definitions are included in this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... implementation of the Environmental Management Plan as measured against policy, objectives and targets... potential hazards to human health or the environment and which must include RCRA “P” wastes, and may include... work practices that both protect human health and the environment from the hazards presented by...

  12. Planning for robust reserve networks using uncertainty analysis

    USGS Publications Warehouse

    Moilanen, A.; Runge, M.C.; Elith, Jane; Tyre, A.; Carmel, Y.; Fegraus, E.; Wintle, B.A.; Burgman, M.; Ben-Haim, Y.

    2006-01-01

    Planning land-use for biodiversity conservation frequently involves computer-assisted reserve selection algorithms. Typically such algorithms operate on matrices of species presence?absence in sites, or on species-specific distributions of model predicted probabilities of occurrence in grid cells. There are practically always errors in input data?erroneous species presence?absence data, structural and parametric uncertainty in predictive habitat models, and lack of correspondence between temporal presence and long-run persistence. Despite these uncertainties, typical reserve selection methods proceed as if there is no uncertainty in the data or models. Having two conservation options of apparently equal biological value, one would prefer the option whose value is relatively insensitive to errors in planning inputs. In this work we show how uncertainty analysis for reserve planning can be implemented within a framework of information-gap decision theory, generating reserve designs that are robust to uncertainty. Consideration of uncertainty involves modifications to the typical objective functions used in reserve selection. Search for robust-optimal reserve structures can still be implemented via typical reserve selection optimization techniques, including stepwise heuristics, integer-programming and stochastic global search.

  13. Standard Review Plan for Environmental Restoration Program Quality Management Plans. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts asmore » a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements.« less

  14. Railroad system of Texas: A component of the state and national transportation infrastructure. Research report, September 1996--November 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roop, S.S.; Warner, J.E.; Rosa, D.

    1998-11-01

    Railroads continue to play an important role in the Texas transportation system. This study addresses the potential for implementing a rail planning process in the Texas Department of Transportation. The study is documented in three reports, produced in coordinated and parallel efforts by the Center for Transportation Research and the Texas Transportation Institute. This report documents the work performed by TTI, whereby a rail planning framework is presented which formalizes the planning process and presents the key elements as a series of discrete and logical steps. These steps may be used to guide TxDOT in the formation of goals, identificationmore » of issues and affected parties, selection of appropriate analytical methodologies, location of data sources, and implementation of results. The report also presents an in-depth discussion of several key issues facing transportation agencies. These include rail line abandonment, intermodal service planning, and urban rail rationalization. A discussion of the Texas rail system covers the Class 1 railroads, shortline railroads, Amtrak, and the Mexican rail system.« less

  15. MO-D-213-01: Workflow Monitoring for a High Volume Radiation Oncology Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laub, S; Dunn, M; Galbreath, G

    2015-06-15

    Purpose: Implement a center wide communication system that increases interdepartmental transparency and accountability while decreasing redundant work and treatment delays by actively monitoring treatment planning workflow. Methods: Intake Management System (IMS), a program developed by ProCure Treatment Centers Inc., is a multi-function database that stores treatment planning process information. It was devised to work with the oncology information system (Mosaiq) to streamline interdepartmental workflow.Each step in the treatment planning process is visually represented and timelines for completion of individual tasks are established within the software. The currently active step of each patient’s planning process is highlighted either red or greenmore » according to whether the initially allocated amount of time has passed for the given process. This information is displayed as a Treatment Planning Process Monitor (TPPM), which is shown on screens in the relevant departments throughout the center. This display also includes the individuals who are responsible for each task.IMS is driven by Mosaiq’s quality checklist (QCL) functionality. Each step in the workflow is initiated by a Mosaiq user sending the responsible party a QCL assignment. IMS is connected to Mosaiq and the sending or completing of a QCL updates the associated field in the TPPM to the appropriate status. Results: Approximately one patient a week is identified during the workflow process as needing to have his/her treatment start date modified or resources re-allocated to address the most urgent cases. Being able to identify a realistic timeline for planning each patient and having multiple departments communicate their limitations and time constraints allows for quality plans to be developed and implemented without overburdening any one department. Conclusion: Monitoring the progression of the treatment planning process has increased transparency between departments, which enables efficient communication. Having built-in timelines allows easy prioritization of tasks and resources and facilitates effective time management.« less

  16. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  17. Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper

    USGS Publications Warehouse

    McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.

    2016-01-01

    In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.

  18. Study of Educational Hospital Employees’ Satisfaction with the Administration of the Health Reform Plan in Ghazvin, 2015

    PubMed Central

    Gholami, Soheyla; Oveisi, Sonia; Ghamari, Fatemeh; Etedal, Mahboobeh Ghorban; Rajaee, Roya

    2015-01-01

    Introduction Employee satisfaction is considered to be an important component in the promotion of service quality and increased efficiency and effectiveness in the reform plan for a healthcare system. Neglecting this issue could result in a lack of success in achieving the healthcare system’s objectives. The healthcare reform plan is being implemented to achieve the objectives of the healthcare system. Thus, given the key role of hospital employees in implementing the reform plan, the aim of this study was to determine the levels of hospital employees’ satisfaction with their jobs. Methods This was a qualitative study in 2015 that included thematic analysis, and 138 employees of the Kosar, Rajaii, and Ghods Hospitals participated. Data were collected using semi-structured interviews, and the data were analyzed using content analysis. Results After analyzing the data collected by interviewing the employees, 132 codes were identified. The codes were classified into five general concepts including opinions about 1) the reform plan and its administrative barriers, 2) changes in visits, 3) changes in working conditions, 4) changes in salaries and 5) General satisfaction of personnel. Conclusion Increasing workloads, stagnant salaries, and the shortage of personnel were the main factors that reduced the satisfaction of the hospitals’ employees with the administration of the healthcare reform plan. PMID:26767104

  19. Towards a Holistic Framework for the Evaluation of Emergency Plans in Indoor Environments

    PubMed Central

    Serrano, Emilio; Poveda, Geovanny; Garijo, Mercedes

    2014-01-01

    One of the most promising fields for ambient intelligence is the implementation of intelligent emergency plans. Because the use of drills and living labs cannot reproduce social behaviors, such as panic attacks, that strongly affect these plans, the use of agent-based social simulation provides an approach to evaluate these plans more thoroughly. (1) The hypothesis presented in this paper is that there has been little interest in describing the key modules that these simulators must include, such as formally represented knowledge and a realistic simulated sensor model, and especially in providing researchers with tools to reuse, extend and interconnect modules from different works. This lack of interest hinders researchers from achieving a holistic framework for evaluating emergency plans and forces them to reconsider and to implement the same components from scratch over and over. In addition to supporting this hypothesis by considering over 150 simulators, this paper: (2) defines the main modules identified and proposes the use of semantic web technologies as a cornerstone for the aforementioned holistic framework; (3) provides a basic methodology to achieve the framework; (4) identifies the main challenges; and (5) presents an open and free software tool to hint at the potential of such a holistic view of emergency plan evaluation in indoor environments. PMID:24662453

  20. Effects of a worker participatory program for improving work environments on job stressors and mental health among workers: a controlled trial.

    PubMed

    Kobayashi, Yuka; Kaneyoshi, Akiko; Yokota, Atsuko; Kawakami, Norito

    2008-01-01

    The Mental Health Action Checklist for a Better Workplace Environment (MHACL) is a tool for a worker participatory approach to improve work environments for worker mental health. The present study investigated the effects of an organizational intervention using the MHACL on reducing job stressors and the psychological distress of workers of a manufacturing enterprise in Japan with a controlled study design. Nine of 45 departments participated in a work environment improvement program, including planning workshops, implementation and monitoring, between July and December 2005 (intervention group, n=321). The remaining 36 departments served as the control group (n=750). Outcomes (job stressors, worksite support, psychological distress, etc.), measured using the Brief Job Stress Questionnaire, as well as sick leave days taken from the company record, were recorded before and six months after the program for both groups. Among women, skill underutilization, supervisor and coworker support, psychological distress, and job satisfaction changed more favorably in the intervention group than in the control group (p<0.05). No significant favorable effect of the program was observed among men. Improvements in the outcomes were more prominent among departments with a 50% or higher rate of worker participation in the planning workshops and among departments with a 50% or higher rate of implemented vs. planned actions. A worker participatory organizational intervention using the MHACL seems effective for promoting mental health among Japanese white-collar women.

  1. Leveraging standards to support patient-centric interdisciplinary plans of care.

    PubMed

    Dykes, Patricia C; DaDamio, Rebecca R; Goldsmith, Denise; Kim, Hyeon-eui; Ohashi, Kumiko; Saba, Virginia K

    2011-01-01

    As health care systems and providers move towards meaningful use of electronic health records, the once distant vision of collaborative patient-centric, interdisciplinary plans of care, generated and updated across organizations and levels of care, may soon become a reality. Effective care planning is included in the proposed Stages 2-3 Meaningful Use quality measures. To facilitate interoperability, standardization of plan of care messaging, content, information and terminology models are needed. This degree of standardization requires local and national coordination. The purpose of this paper is to review some existing standards that may be leveraged to support development of interdisciplinary patient-centric plans of care. Standards are then applied to a use case to demonstrate one method for achieving patient-centric and interoperable interdisciplinary plan of care documentation. Our pilot work suggests that existing standards provide a foundation for adoption and implementation of patient-centric plans of care that are consistent with federal requirements.

  2. A dynamic case-based planning system for space station application

    NASA Technical Reports Server (NTRS)

    Oppacher, F.; Deugo, D.

    1988-01-01

    We are currently investigating the use of a case-based reasoning approach to develop a dynamic planning system. The dynamic planning system (DPS) is designed to perform resource management, i.e., to efficiently schedule tasks both with and without failed components. This approach deviates from related work on scheduling and on planning in AI in several aspects. In particular, an attempt is made to equip the planner with an ability to cope with a changing environment by dynamic replanning, to handle resource constraints and feedback, and to achieve some robustness and autonomy through plan learning by dynamic memory techniques. We briefly describe the proposed architecture of DPS and its four major components: the PLANNER, the plan EXECUTOR, the dynamic REPLANNER, and the plan EVALUATOR. The planner, which is implemented in Smalltalk, is being evaluated for use in connection with the Space Station Mobile Service System (MSS).

  3. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  4. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  5. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  6. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  7. 77 FR 16937 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State Implementation Plan AGENCY... limited disapproval of West Virginia's Regional Haze State Implementation Plan (SIP) revision. EPA is... mandatory Class I areas through a regional haze program. EPA is also approving this revision as meeting the...

  8. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...

  9. Recommendation of a More Effective Alternative to the NASA Launch Services Program Mission Integration Reporting System (MIRS) and Implementation of Updates to the Mission Plan

    NASA Technical Reports Server (NTRS)

    Dunn, Michael R.

    2014-01-01

    Over the course of my internship in the Flight Projects Office of NASA's Launch Services Program (LSP), I worked on two major projects, both of which dealt with updating current systems to make them more accurate and to allow them to operate more efficiently. The first project dealt with the Mission Integration Reporting System (MIRS), a web-accessible database application used to manage and provide mission status reporting for the LSP portfolio of awarded missions. MIRS had not gone through any major updates since its implementation in 2005, and it was my job to formulate a recommendation for the improvement of the system. The second project I worked on dealt with the Mission Plan, a document that contains an overview of the general life cycle that is followed by every LSP mission. My job on this project was to update the information currently in the mission plan and to add certain features in order to increase the accuracy and thoroughness of the document. The outcomes of these projects have implications in the orderly and efficient operation of the Flight Projects Office, and the process of Mission Management in the Launch Services Program as a whole.

  10. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  11. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zarate, M.A.; Slotnick, J.; Ramos, M.

    The development and implementation of a solid waste management program served to build local capacity in San Mateo Ixtatan between 2002 and 2003 as part of a public health action plan. The program was developed and implemented in two phases: (1) the identification and education of a working team from the community; and (2) the completion of a solid waste classification and quantification study. Social capital and the water cycle were two public health approaches utilized to build a sustainable program. The activities accomplished gained support from the community and municipal authorities. A description of the tasks completed and findingsmore » of the solid waste classification and quantification performed by a local working group are presented in this paper.« less

  13. Implementing AACN's recommendations for environmental sustainability in colleges of nursing: from concept to impact.

    PubMed

    Butterfield, Patricia; Schenk, Elizabeth; Eide, Phyllis; Hahn, Laura; Postma, Julie; Fitzgerald, Cynthia; Oneal, Gail

    2014-01-01

    In 2011, the American Association of Colleges of Nursing (AACN) released a guidance report titled Toward an Environmentally Sustainable Academic Enterprise: An AACN Guide for Nursing Education. The report was developed in response to a vivid slide presentation at an AACN meeting depicting the deleterious public and environmental health effects of global industrialization. Following the presentation, AACN members capitalized on the opportunity to provide national leadership to U.S. colleges of nursing in regard to environmental sustainability and stewardship. This article summarizes key features of the AACN plan and outlines one college's multifaceted implementation plan. The goal of the implementation plan was to translate the AACN recommendations from concept into college-specific actions. Specific steps taken by the college included the following: (a) increasing student and faculty awareness, (b) greening business operations, (c) increased participation in media events, (d) leveraging the impact of national sustainability initiatives, and (e) enhancing curricula at the undergraduate and graduate levels. Through this work, the college achieved not only a higher standard of sustainability within its own walls but also a richer appreciation of the importance of educating nurses as future stewards in an environmentally sustainable health care system. © 2014.

  14. Aerospace Expeditionary Force Implementation and the Effect on Team Cohesion

    DTIC Science & Technology

    2002-03-01

    quickly load UTCs during real world conflicts, deployments, or exercises. The TPFDD is the Joint Operation Planning and Execution System data base... system in mission capable status in an efficeint manner. Time is saved by not having to establish work/personal relationships and new work peocesses...there wasn’t enough time for the system to process backfills for shortfalls that were, in reality, not shortfalls at all but a rainbow package. While

  15. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  16. Feasibility study of an Integrated Program for Aerospace-vehicle Design (IPAD) system. Volume 6: Implementation schedule, development costs, operational costs, benefit assessment, impact on company organization, spin-off assessment, phase 1, tasks 3 to 8

    NASA Technical Reports Server (NTRS)

    Garrocq, C. A.; Hurley, M. J.; Dublin, M.

    1973-01-01

    A baseline implementation plan, including alternative implementation approaches for critical software elements and variants to the plan, was developed. The basic philosophy was aimed at: (1) a progressive release of capability for three major computing systems, (2) an end product that was a working tool, (3) giving participation to industry, government agencies, and universities, and (4) emphasizing the development of critical elements of the IPAD framework software. The results of these tasks indicate an IPAD first release capability 45 months after go-ahead, a five year total implementation schedule, and a total developmental cost of 2027 man-months and 1074 computer hours. Several areas of operational cost increases were identified mainly due to the impact of additional equipment needed and additional computer overhead. The benefits of an IPAD system were related mainly to potential savings in engineering man-hours, reduction of design-cycle calendar time, and indirect upgrading of product quality and performance.

  17. Implementing a Capital Plan.

    ERIC Educational Resources Information Center

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  18. Consultants in nhs scotland: a survey of work commitments, remuneration, job satisfaction and retirement plans.

    PubMed

    French, F H; Andrew, J E; Awramenko, M; Coutts, H; Leighton-Beck, L; Mollison, J; Needham, G; Scott, A; Walker, K A

    2004-05-01

    UK consultants have reported working long hours, increased stress and reduced morale. This study set out to elicit consultants' views on flexible working and to gather data on consultants' workloads, remuneration, job satisfaction and retirement plans. As such it is the first comprehensive study of consultants in NHS Scotland. The Information and Statistics Division of the Scottish Executive Health Dept provided a list of consultants working in NHS Scotland Focus groups and interviews informed the design of a postal self-completion, questionnaire. The response ratewas 61%. Almost two-thirds (65%) of respondents felt their workloads were unreasonable and unsustainable and 67% were unable to provide their desired standards of patient care. Two-thirds (67%) did not normally take meal breaks, 63% had insufficient time for outside interests, whilst 44% felt their health was being adversely affected Many (84%) believed that some of their work could be delegated to someone less qualified but 79% agreed that there were insufficient staff to make this possible. The average planned retirement age was 60 years, with 23% describing their plans as definite and 70% as quite or very likely. When asked what might induce them to postpone retirement, 50% cited reduced workload/work intensity. In 2003, a majority of consultants in the UK voted in favour of the new consultant contract. This will improve consultant pay and introduce a standard 40-hour working week, including worked on-call. This should address tow of the main areas of consultant dissatisfaction in NHS Scotland. However, staff shortages will require to be addressed if the contract is to be successfully implemented.

  19. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  20. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  1. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  2. 40 CFR 52.1973 - Approval of plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...

  3. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  4. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  5. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  6. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  7. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  8. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  9. Integration of Palliative Care Principles into the Ongoing Care of Children with Cancer: Individualized Care Planning and Coordination

    PubMed Central

    Baker, Justin N; Hinds, Pamela S; Spunt, Sheri L; Barfield, Raymond C; Allen, Caitlin; Powell, Brent C; Anderson, Lisa H; Kane, Javier R

    2008-01-01

    Synopsis The Individualized Care Planning and Coordination Model is designed to integrate palliative care principles and practices into the ongoing care of children with cancer. Application of the model helps clinicians to generate a comprehensive individualized care plan that is implemented through Individualized Care Coordination processes as detailed here. Clinicians’ strong desire to provide compassionate, competent and sensitive care to the seriously ill child and the child’s family can be effectively translated into clinical practice through these processes. “To cure sometimes, to relieve often, to comfort always -- this is our work.” Author Unknown PMID:18242323

  10. Using AI Planning Techniques to Automatically Generate Image Processing Procedures: A Preliminary Report

    NASA Technical Reports Server (NTRS)

    Chien, S.

    1994-01-01

    This paper describes work on the Multimission VICAR Planner (MVP) system to automatically construct executable image processing procedures for custom image processing requests for the JPL Multimission Image Processing Lab (MIPL). This paper focuses on two issues. First, large search spaces caused by complex plans required the use of hand encoded control information. In order to address this in a manner similar to that used by human experts, MVP uses a decomposition-based planner to implement hierarchical/skeletal planning at the higher level and then uses a classical operator based planner to solve subproblems in contexts defined by the high-level decomposition.

  11. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  12. Progressively implementation of the new degrees at E.T.S. of Agriculture Engineering and extinction of the earlier degrees

    NASA Astrophysics Data System (ADS)

    Arce, A.; Caniego, J.; Vazquez, J.; Serrano, A.; Tarquis, A. M.; Cartagena, M. C.

    2012-04-01

    The Bologna process is to improve the quality of education, mobility, diversity and the competitiveness and involves three fundamental changes: transform of the structure of titles, changing in methods of teaching and implementation of the systems of quality assurance. Once that the new degrees have been implemented with this structure, and began at E.T.S. of Agriculture Engineering (ETSIA) at Madrid from 2010-2011 course, the main aim of this work is to deeply study the changes in teaching methodology as well as progressively implementation of the educational planning of the three new degrees: Engineering and Agronomic Graduate, Food Industry Engineering Graduate and Agro-environmental Graduate. Each one of them presents 240 ECTS with a common first course and will have access to an official Master in Agronomic Engineering. As part as an educational innovation project awarded by the Technical University of Madrid (UPM) to improve educational quality, the second course has been designed with the main objective to continue the educative model implemented last course. This model identifies several teaching activities and represents a proper teaching style at ETSIA-UPM. At the same time, a monitoring and development coordination plans have been established. On the other hand, a procedure to extinguish the earlier plans of Agriculture Engineering was also defined. Other activities related to this Project were the information improvement of the grades, in particular at High Schools centers, improving the processes of reception, counseling and tutoring and mentoring. Likewise, cooperative working workshops and programs to support the teaching of English language were implemented. Satisfaction surveys and opinion polls were done to professors and students involved in first course in order to test several aspects of this project. The students surveys were analyzed taking in account the academic results and their participation in mentoring activities giving a highly satisfactory level. In general, the professors gave the same result although they pointed out certain discontent respect to some circumstances giving some solutions to correct these problems.

  13. Workplace managers' view of the role of co-workers in return-to-work.

    PubMed

    Dunstan, Debra A; MacEachen, Ellen

    2016-11-01

    Theoretical and empirical research findings attest to the workplace being a social environment in which co-workers have a critical influence on the employment outcomes and return-to-work (RTW) success of other employees. However, co-workers do not have a formal role in RTW planning. The aim of this study was to explore how managers responsible for developing and implementing RTW procedures view the role of co-workers in this process. An exploratory qualitative pilot study was conducted in Canada. Participants (1 male; 13 females; mean experience in RTW = 11.8 years) were workplace (n=8) or RTW managers (n=6) with direct oversight of RTW plans. The participants were recruited via invitation from a research institute and were drawn from three different provinces. Data were gathered via open-ended questions and were coded and subject to thematic analysis. Three key themes were identified: (1) Managers view RTW as having little relevance to co-workers but expect them to cooperate with the arrangements; (2) Formal procedures are inadequate when psychosocial barriers to work resumption are present, so managers use informal strategies to engage co-workers' emotional and social support; and (3) Managers have difficulty integrating RTW procedures with other legal obligations, such as privacy and confidentiality requirements. Existing arrangements for the development and implementation of RTW are sufficient most of the time, but may be inadequate when an injured worker presents with psychosocial barriers to work resumption. Implications for Rehabilitation Standard RTW arrangements can be inadequate when a RTW plan requires active co-worker support. Privacy and confidentiality provisions can result in managers using informal procedures for information exchange and to engage co-workers. The use of risk management strategies - assessment, consultation and communication - could be used to include co-workers when workplace issues threaten the success of a RTW plan.

  14. Barriers to Advance Care Planning at the End of Life: An Explanatory Systematic Review of Implementation Studies

    PubMed Central

    Lund, Susi; Richardson, Alison; May, Carl

    2015-01-01

    Context Advance Care Plans (ACPs) enable patients to discuss and negotiate their preferences for the future including treatment options at the end of life. Their implementation poses significant challenges. Objective To investigate barriers and facilitators to the implementation of ACPs, focusing on their workability and integration in clinical practice. Design An explanatory systematic review of qualitative implementation studies. Data sources Empirical studies that reported interventions designed to support ACP in healthcare. Web of Knowledge, Ovid MEDLINE, CINAHL, PsycINFO, British Nursing Index and PubMed databases were searched. Methods Direct content analysis, using Normalization Process Theory, to identify and characterise relevant components of implementation processes. Results 13 papers identified from 166 abstracts were included in the review. Key factors facilitating implementation were: specially prepared staff utilizing a structured approach to interactions around ACPs. Barriers to implementation were competing demands of other work, the emotional and interactional nature of patient-professional interactions around ACPs, problems in sharing decisions and preferences within and between healthcare organizations. Conclusions This review demonstrates that doing more of the things that facilitate delivery of ACPs will not reduce the effects of those things that undermine them. Structured tools are only likely to be partially effective and the creation of a specialist cadre of ACP facilitators is unlikely to be a sustainable solution. The findings underscore both the challenge and need to find ways to routinely incorporate ACPs in clinical settings where multiple and competing demands impact on practice. Interventions most likely to meet with success are those that make elements of Advance Care Planning workable within complex and time pressured clinical workflows. PMID:25679395

  15. The production deployment of IPv6 on WLCG

    NASA Astrophysics Data System (ADS)

    Bernier, J.; Campana, S.; Chadwick, K.; Chudoba, J.; Dewhurst, A.; Eliáš, M.; Fayer, S.; Finnern, T.; Grigoras, C.; Hartmann, T.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Macmahon, E.; Martelli, E.; Millar, A. P.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Voicu, R.; Walker, C. J.; Wildish, T.

    2015-12-01

    The world is rapidly running out of IPv4 addresses; the number of IPv6 end systems connected to the internet is increasing; WLCG and the LHC experiments may soon have access to worker nodes and/or virtual machines (VMs) possessing only an IPv6 routable address. The HEPiX IPv6 Working Group has been investigating, testing and planning for dual-stack services on WLCG for several years. Following feedback from our working group, many of the storage technologies in use on WLCG have recently been made IPv6-capable. This paper presents the IPv6 requirements, tests and plans of the LHC experiments together with the tests performed on the group's IPv6 test-bed. This is primarily aimed at IPv6-only worker nodes or VMs accessing several different implementations of a global dual-stack federated storage service. Finally the plans for deployment of production dual-stack WLCG services are presented.

  16. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    PubMed

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  17. Redefining Tactical Operations for MER Using Cloud Computing

    NASA Technical Reports Server (NTRS)

    Joswig, Joseph C.; Shams, Khawaja S.

    2011-01-01

    The Mars Exploration Rover Mission (MER) includes the twin rovers, Spirit and Opportunity, which have been performing geological research and surface exploration since early 2004. The rovers' durability well beyond their original prime mission (90 sols or Martian days) has allowed them to be a valuable platform for scientific research for well over 2000 sols, but as a by-product it has produced new challenges in providing efficient and cost-effective tactical operational planning. An early stage process adaptation was the move to distributed operations as mission scientists returned to their places of work in the summer of 2004, but they would still came together via teleconference and connected software to plan rover activities a few times a week. This distributed model has worked well since, but it requires the purchase, operation, and maintenance of a dedicated infrastructure at the Jet Propulsion Laboratory. This server infrastructure is costly to operate and the periodic nature of its usage (typically heavy usage for 8 hours every 2 days) has made moving to a cloud based tactical infrastructure an extremely tempting proposition. In this paper we will review both past and current implementations of the tactical planning application focusing on remote plan saving and discuss the unique challenges present with long-latency, distributed operations. We then detail the motivations behind our move to cloud based computing services and as well as our system design and implementation. We will discuss security and reliability concerns and how they were addressed

  18. Lunar Dust Mitigation Technology Development

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Deluane, Paul B.

    2008-01-01

    NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

  19. SU-E-T-595: Design of a Graphical User Interface for An In-House Monte Carlo Based Treatment Planning System: Planning and Contouring Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    EMAM, M; Eldib, A; Lin, M

    2014-06-01

    Purpose: An in-house Monte Carlo based treatment planning system (MC TPS) has been developed for modulated electron radiation therapy (MERT). Our preliminary MERT planning experience called for a more user friendly graphical user interface. The current work aimed to design graphical windows and tools to facilitate the contouring and planning process. Methods: Our In-house GUI MC TPS is built on a set of EGS4 user codes namely MCPLAN and MCBEAM in addition to an in-house optimization code, which was named as MCOPTIM. Patient virtual phantom is constructed using the tomographic images in DICOM format exported from clinical treatment planning systemsmore » (TPS). Treatment target volumes and critical structures were usually contoured on clinical TPS and then sent as a structure set file. In our GUI program we developed a visualization tool to allow the planner to visualize the DICOM images and delineate the various structures. We implemented an option in our code for automatic contouring of the patient body and lungs. We also created an interface window displaying a three dimensional representation of the target and also showing a graphical representation of the treatment beams. Results: The new GUI features helped streamline the planning process. The implemented contouring option eliminated the need for performing this step on clinical TPS. The auto detection option for contouring the outer patient body and lungs was tested on patient CTs and it was shown to be accurate as compared to that of clinical TPS. The three dimensional representation of the target and the beams allows better selection of the gantry, collimator and couch angles. Conclusion: An in-house GUI program has been developed for more efficient MERT planning. The application of aiding tools implemented in the program is time saving and gives better control of the planning process.« less

  20. Strategic planning for employee happiness: a business goal for human service organizations.

    PubMed

    Howard, B; Gould, K E

    2000-09-01

    Employee happiness can impact substantially on an organization's performance. It can influence employee retention, absenteeism, and work performance. Because of this importance, such happiness is inseparable from the real business of the organization and should be considered a business goal. Implementation and development of the strategic plan associated with this goal becomes the responsibility of a highly placed project team that has as its mission ensuring employee satisfaction. The strategic plan includes procedures that allow management to listen effectively to employees, assessing and responding to their values and needs. In this paper we discuss the workforce and environmental characteristics that are involved planning for employee happiness and the steps in creating an organizational culture in which this can become a business goal.

  1. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  2. Advance care planning for residents in aged care facilities: what is best practice and how can evidence-based guidelines be implemented?

    PubMed

    Lyon, Cheryl

    2007-12-01

    Background  Advance care planning in a residential care setting aims to assist residents to make decisions about future healthcare and to improve end-of-life care through medical and care staff knowing and respecting the wishes of the resident. The process enables individuals and others who are important to them, to reflect on what is important to the resident including their beliefs/values and preferences about care when they are dying. This paper describes a project conducted as part of the Joanna Briggs Institute Clinical Aged Care Fellowship Program implemented at the Manningham Centre in metropolitan Melbourne in a unit providing services for 46 low and high care residents. Objectives  The objectives of the study were to document implementation of best practice in advance care planning in a residential aged care facility using a cycle of audit, feedback and re-audit cycle audit with a clinical audit software program, the Practical Application of Clinical Evidence System. The evidence-based guidelines found in 'Guidelines for a Palliative Approach in Residential Aged Care' were used to inform the process of clinical practice review and to develop a program to implement advance care planning. Results  The pre-implementation audit results showed that advance care planning practice was not based on high level evidence as initial compliance with five audit criteria was 0%. The barriers to implementation that became apparent during the feedback stage included the challenge of creating a culture where advance care planning policy, protocols and guidelines could be implemented, and advance care planning discussions held, by adequately prepared health professionals and carers. Opportunities were made to equip the resident to discuss their wishes with family, friends and healthcare staff. Some residents made the decision to take steps to formally document those wishes and/or appoint a Medical Enduring Power of Attorney to act on behalf of the resident when they are unable to communicate wishes. The post-implementation audit showed a clear improvement as compliance ranged from 15-100% for the five audit criteria. Strong leadership by the project team was effective in engaging staff in this quality improvement program. Conclusion  The outcomes of the project were extremely positive and demonstrate a genuine improvement in practice. All audit criteria indicate that the Manningham Centre is now positively working towards improved practice based on the best available evidence. It is hoped that as the expertise developed during this project is shared, other areas of gerontological practice will be similarly improved and more facilities caring for the older person will embrace evidence-based practice.

  3. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    PubMed

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  4. Using IT to improve quality at NewYork-Presybterian Hospital: a requirements-driven strategic planning process.

    PubMed

    Kuperman, Gilad J; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D; Cooper, Mary

    2006-01-01

    At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality.

  5. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  6. Using IT to Improve Quality at NewYork-Presybterian Hospital: A Requirements-Driven Strategic Planning Process

    PubMed Central

    Kuperman, Gilad J.; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D.; Cooper, Mary

    2006-01-01

    At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality. PMID:17238381

  7. [Healthcare promotion in primary care: if Hippocrates were alive today…].

    PubMed

    Cabeza, Elena; March, Sebastià; Cabezas, Carmen; Segura, Andreu

    2016-11-01

    This article argues for the need to implement community healthcare promotion initiatives in medical practice. Some of the community initiatives introduced in primary care, as well as scientific evidence and associated implementation factors are described. The need for effective coordination between primary care and public health services, working with the community, is underlined. Two specific coordination initiatives are explained by way of example. The first is a project to develop healthcare plans in health centres in the Balearic Islands, by means of a participatory process with the collaboration of citizens, local organisations and the town council (urban planning, mobility, social services, etc.). The second is the Interdepartmental Public Health Plan of Catalonia, which was established to coordinate cross-sectoral healthcare. A specific part of this plan is the COMSalud project, the purpose of which is to introduce a community perspective to health centres and which is currently being piloted in 16 health areas. We review the proposals of a 2008 research study to implement healthcare promotion in primary care, assessing its achievements and shortfalls. The Disease Prevention and Health Promotion Strategy of the Spanish Ministry of Health is recognised as an opportunity to coordinate primary and public health. It is concluded that this change of mentality will require both financial and human resources to come to fruition. Copyright © 2016 SESPAS. Publicado por Elsevier España, S.L.U. All rights reserved.

  8. The need for coherence between waterfowl harvest and habitat management

    USGS Publications Warehouse

    Runge, M.C.; Johnson, F.A.; Anderson, M.G.; Koneff, M.D.; Reed, E.T.; Mott, S.E.

    2006-01-01

    Two of the most significant management efforts affecting waterfowl populations in North America are the North American Waterfowl Management Plan (the Plan) and Federal harvest management programs. Both the Plan and harvest management are continental in scope, involve an extensive group of stakeholders, and rely on adaptive processes of biological planning, implementation, and evaluation. The development of these programs has occurred independently, however, and there has been little explicit recognition that both harvest and habitat effects should be considered for coherent management planning and evaluation. For example, the harvest strategy can affect whether population objectives of the Plan are met, irrespective of the success of the Plan's habitat conservation efforts. Conversely, habitat conservation activities under the Plan can influence harvest potential and, therefore, the amount of hunting opportunity provided. It seems increasingly clear that the Plan's waterfowl population objectives can only be useful for conservation planning and evaluation if they are accompanied by an explicit specification of the harvest strategy and environmental conditions under which they are to be achieved. This clarification also is necessary to ensure that Plan population objectives are not attained solely through the reduction of hunting opportunity. We believe then that it is imperative that these key waterfowl-management programs work to harmonize their objectives. Harvest management programs and the Plan ought to be working toward the same ends, but that is not possible so long as the mutually reinforcing relationship of these programs is obscured by ambiguities in their management objectives.

  9. 75 FR 54805 - Approval and Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO) Limited Maintenance Plan for... June 16, 2010, to revise the Minnesota State Implementation Plan (SIP) for carbon monoxide (CO) under the Clean Air Act (CAA). The State has submitted a limited maintenance plan for CO showing continued...

  10. 40 CFR 49.9861 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9861 Identification of plan. This section and §§ 49.9862 through 49.9890 contain the implementation plan for the Burns Paiute Tribe of the Burns...

  11. 75 FR 63139 - Approval and Promulgation of Implementation Plans-Maricopa County (Phoenix) PM-10 Nonattainment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... Promulgation of Implementation Plans--Maricopa County (Phoenix) PM-10 Nonattainment Area; Serious Area Plan for... implementation plan (SIP) revisions submitted by the State of Arizona to meet, among other requirements, section... (Maricopa area). Specifically, EPA proposed to disapprove provisions of the 189(d) plan because they do not...

  12. Digital Architecture Planning Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oxstrand, Johanna Helene; Al Rashdan, Ahmad Yahya Mohammad; Bly, Aaron Douglas

    As part of the U.S. Department of Energy’s Light Water Reactor Sustainability Program, the Digital Architecture (DA) Project focuses on providing a model that nuclear utilities can refer to when planning deployment of advanced technologies. The digital architecture planning model (DAPM) is the methodology for mapping power plant operational and support activities into a DA that unifies all data sources needed by the utilities to operate their plants. The DA is defined as a collection of information technology capabilities needed to support and integrate a wide spectrum of real-time digital capabilities for performance improvements of nuclear power plants. DA canmore » be thought of as integration of the separate instrumentation and control and information systems already in place in nuclear power plants, which are brought together for the purpose of creating new levels of automation in plant work activities. A major objective in DAPM development was to survey all key areas that needed to be reviewed in order for a utility to make knowledgeable decisions regarding needs and plans to implement a DA at the plant. The development was done in two steps. First, researchers surveyed the nuclear industry in order to learn their near-term plans for adopting new advanced capabilities and implementing a network (i.e., wireless and wire) infrastructure throughout the plant, including the power block. Secondly, a literature review covering regulatory documents, industry standards, and technical research reports and articles was conducted. The objective of the review was to identify key areas to be covered by the DAPM, which included the following: 1. The need for a DA and its benefits to the plant 2. Resources required to implement the DA 3. Challenges that need to be addressed and resolved to implement the DA 4. Roles and responsibilities of the DA implementation plan. The DAPM was developed based on results from the survey and the literature review. Model development, including the survey results and conclusions made about the key areas during the literature review, are described in this report.« less

  13. Scoping Planning Agents With Shared Models

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Frank, Jeremy D.; Jonsson, Ari K.; McGann, Conor

    2003-01-01

    In this paper we provide a formal framework to define the scope of planning agents based on a single declarative model. Having multiple agents sharing a single model provides numerous advantages that lead to reduced development costs and increase reliability of the system. We formally define planning in terms of extensions of an initial partial plan, and a set of flaws that make the plan unacceptable. A Flaw Filter (FF) allows us to identify those flaws relevant to an agent. Flaw filters motivate the Plan Identification Function (PIF), which specifies when an agent is is ready hand control to another agent for further work. PIFs define a set of plan extensions that can be generated from a model and a plan request. FFs and PIFs can be used to define the scope of agents without changing the model. We describe an implementation of PIFsand FFswithin the context of EUROPA, a constraint-based planning architecture, and show how it can be used to easily design many different agents.

  14. Family Health Services project: the way forward.

    PubMed

    Dabiri, O M

    1993-01-01

    Nigerians did not readily accept family planning when Family Health Services (FHS) began in 1988. FHS has made much headway in training, IEC (information, education, and communication), and constituency building and advocacy. Its staff have identified obstacles to implementation, especially program sustainability and management structure. Key limits to sustainability of IEC efforts were inadequately trained personnel and inability of trained personnel to apply what they learned at work stations. The Federal Ministry and Social Services' role in the FHS project was not clearly defined. Some private sector factors contributing to a confused management structure were inadequate method mix, high contraceptive cost, poor monitoring of quality of care, and no coordination of family planning training with the public factor. FHS has since decided to focus its efforts on increasing the demand for and availability of modern contraceptives and improving the quality of family planning services of both the public and private sectors. FHS hopes that accomplishing these activities will reduce fertility, morbidity, and mortality. Strategic plans include a regional focus, quality of care, a variety of methods offered, intensification, hospital and clinics, a management information system, contraceptive logistics, distribution regulations, and addressing social, cultural, and behavioral factors. To effectively implement the strategy, USAID and the Federal Ministry held a workshop in 1993 to effect full integration of Nigerian experience in the 2nd phase of the project (FHS II). Participants reviewed the strengths and weaknesses of the first phase and agreed on implementation. For example, nongovernmental organizations should implement FHS II. FHS II includes training, IEC, and commodities/logistics.

  15. [Occupational health protection in business economics--business plan for health intervention].

    PubMed

    Rydlewska-Liszkowska, Izabela

    2011-01-01

    One of the company's actions for strengthening human capital is the protection of health and safety of its employees. Its implementation needs financial resources, therefore, employers expect tangible effectiveness in terms of health and economics. Business plan as an element of company planning can be a helpful tool for new health interventions management. The aim of this work was to elaborate a business plan framework for occupational health interventions at the company level, combining occupational health practices with company management and economics. The business plan of occupational health interventions was based on the literature review, the author's own research projects and meta-analysis of research reports on economic relations between occupational health status and company productivity. The study resulted in the development of the business plan for occupational health interventions at the company level. It consists of summary and several sections that address such issues as the key elements of the intervention discussed against a background of the company economics and management, occupational health and safety status of the staff, employees' health care organization, organizational plan of providing the employees with health protection, marketing plan, including specificity of health interventions in the company marketing plan and financial plan, reflecting the economic effects of health care interventions on the overall financial management of the company. Business plan defines occupational health and safety interventions as a part of the company activities as a whole. Planning health care interventions without relating them to the statutory goals of the company may have the adverse impact on the financial balance and profitability of the company. Therefore, business plan by providing the opportunity of comparing different options of occupational health interventions to be implemented by employers is a key element of the management of employees' health.

  16. Inverse-optimized 3D conformal planning: Minimizing complexity while achieving equivalence with beamlet IMRT in multiple clinical sites

    PubMed Central

    Fraass, Benedick A.; Steers, Jennifer M.; Matuszak, Martha M.; McShan, Daniel L.

    2012-01-01

    Purpose: Inverse planned intensity modulated radiation therapy (IMRT) has helped many centers implement highly conformal treatment planning with beamlet-based techniques. The many comparisons between IMRT and 3D conformal (3DCRT) plans, however, have been limited because most 3DCRT plans are forward-planned while IMRT plans utilize inverse planning, meaning both optimization and delivery techniques are different. This work avoids that problem by comparing 3D plans generated with a unique inverse planning method for 3DCRT called inverse-optimized 3D (IO-3D) conformal planning. Since IO-3D and the beamlet IMRT to which it is compared use the same optimization techniques, cost functions, and plan evaluation tools, direct comparisons between IMRT and simple, optimized IO-3D plans are possible. Though IO-3D has some similarity to direct aperture optimization (DAO), since it directly optimizes the apertures used, IO-3D is specifically designed for 3DCRT fields (i.e., 1–2 apertures per beam) rather than starting with IMRT-like modulation and then optimizing aperture shapes. The two algorithms are very different in design, implementation, and use. The goals of this work include using IO-3D to evaluate how close simple but optimized IO-3D plans come to nonconstrained beamlet IMRT, showing that optimization, rather than modulation, may be the most important aspect of IMRT (for some sites). Methods: The IO-3D dose calculation and optimization functionality is integrated in the in-house 3D planning/optimization system. New features include random point dose calculation distributions, costlet and cost function capabilities, fast dose volume histogram (DVH) and plan evaluation tools, optimization search strategies designed for IO-3D, and an improved, reimplemented edge/octree calculation algorithm. The IO-3D optimization, in distinction to DAO, is designed to optimize 3D conformal plans (one to two segments per beam) and optimizes MLC segment shapes and weights with various user-controllable search strategies which optimize plans without beamlet or pencil beam approximations. IO-3D allows comparisons of beamlet, multisegment, and conformal plans optimized using the same cost functions, dose points, and plan evaluation metrics, so quantitative comparisons are straightforward. Here, comparisons of IO-3D and beamlet IMRT techniques are presented for breast, brain, liver, and lung plans. Results: IO-3D achieves high quality results comparable to beamlet IMRT, for many situations. Though the IO-3D plans have many fewer degrees of freedom for the optimization, this work finds that IO-3D plans with only one to two segments per beam are dosimetrically equivalent (or nearly so) to the beamlet IMRT plans, for several sites. IO-3D also reduces plan complexity significantly. Here, monitor units per fraction (MU/Fx) for IO-3D plans were 22%–68% less than that for the 1 cm × 1 cm beamlet IMRT plans and 72%–84% than the 0.5 cm × 0.5 cm beamlet IMRT plans. Conclusions: The unique IO-3D algorithm illustrates that inverse planning can achieve high quality 3D conformal plans equivalent (or nearly so) to unconstrained beamlet IMRT plans, for many sites. IO-3D thus provides the potential to optimize flat or few-segment 3DCRT plans, creating less complex optimized plans which are efficient and simple to deliver. The less complex IO-3D plans have operational advantages for scenarios including adaptive replanning, cases with interfraction and intrafraction motion, and pediatric patients. PMID:22755717

  17. Tools for Implementing an Evidence-Based Approach in Public Health Practice

    PubMed Central

    Jacobs, Julie A.; Jones, Ellen; Gabella, Barbara A.; Spring, Bonnie

    2012-01-01

    Increasing disease rates, limited funding, and the ever-growing scientific basis for intervention demand the use of proven strategies to improve population health. Public health practitioners must be ready to implement an evidence-based approach in their work to meet health goals and sustain necessary resources. We researched easily accessible and time-efficient tools for implementing an evidence-based public health (EBPH) approach to improve population health. Several tools have been developed to meet EBPH needs, including free online resources in the following topic areas: training and planning tools, US health surveillance, policy tracking and surveillance, systematic reviews and evidence-based guidelines, economic evaluation, and gray literature. Key elements of EBPH are engaging the community in assessment and decision making; using data and information systems systematically; making decisions on the basis of the best available peer-reviewed evidence (both quantitative and qualitative); applying program-planning frameworks (often based in health-behavior theory); conducting sound evaluation; and disseminating what is learned. PMID:22721501

  18. NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

    NASA Technical Reports Server (NTRS)

    Smith, David A.; Smith, John V.

    2010-01-01

    The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

  19. AN ADVANCED TOOL FOR APPLIED INTEGRATED SAFETY MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Potts, T. Todd; Hylko, James M.; Douglas, Terence A.

    2003-02-27

    WESKEM, LLC's Environmental, Safety and Health (ES&H) Department had previously assessed that a lack of consistency, poor communication and using antiquated communication tools could result in varying operating practices, as well as a failure to capture and disseminate appropriate Integrated Safety Management (ISM) information. To address these issues, the ES&H Department established an Activity Hazard Review (AHR)/Activity Hazard Analysis (AHA) process for systematically identifying, assessing, and controlling hazards associated with project work activities during work planning and execution. Depending on the scope of a project, information from field walkdowns and table-top meetings are collected on an AHR form. The AHAmore » then documents the potential failure and consequence scenarios for a particular hazard. Also, the AHA recommends whether the type of mitigation appears appropriate or whether additional controls should be implemented. Since the application is web based, the information is captured into a single system and organized according to the >200 work activities already recorded in the database. Using the streamlined AHA method improved cycle time from over four hours to an average of one hour, allowing more time to analyze unique hazards and develop appropriate controls. Also, the enhanced configuration control created a readily available AHA library to research and utilize along with standardizing hazard analysis and control selection across four separate work sites located in Kentucky and Tennessee. The AHR/AHA system provides an applied example of how the ISM concept evolved into a standardized field-deployed tool yielding considerable efficiency gains in project planning and resource utilization. Employee safety is preserved through detailed planning that now requires only a portion of the time previously necessary. The available resources can then be applied to implementing appropriate engineering, administrative and personal protective equipment controls in the field.« less

  20. Ozone Control Strategies | Ground-level Ozone | New ...

    EPA Pesticide Factsheets

    2017-09-05

    The Air Quality Planning Unit's primary goal is to protect your right to breathe clean air. Guided by the Clean Air Act, we work collaboratively with states, communities, and businesses to develop and implement strategies to reduce air pollution from a variety of sources that contribute to the ground-level ozone or smog problem.

  1. Computer Output Microform (COM) Catalog Requirements for the Virginia Commonwealth University Libraries.

    ERIC Educational Resources Information Center

    White, Robert L.

    Generated as the result of the deliberations of the COM Catalog Advisory Work Group, which depended heavily on a review of the available literature, individual analysis, and group discussion, this report is intended as a general planning document for Virginia Commonwealth university libraries concerning their possible implementation of a COM…

  2. IDENTIFICATION AND CHARACTERIZATION OF FIVE NON- TRADITIONAL SOURCE CATEGORIES: CATASTROPHIC/ACCIDENTAL RELEASES, VEHICLE REPAIR FACILITIES, RECYCLING, PESTICIDE APPLICATION, AND AGRICULTURAL OPERATIONS

    EPA Science Inventory

    The report gives results of work that is part of EPA's program to identify and characterize emissions sources not currently accounted for by either the existing Aerometric Information Retrieval System (AIRS) or State Implementation Plan (SIP) area source methodologies and to deve...

  3. Final recovery plan of the southwestern willow flycatcher (Empidonax traillii extimus)

    Treesearch

    Deborah M. Finch; Stephen I. Rothstein; Jon C. Boren; William L. Graf; Jerry L. Holechek; Barbara E. Kus; Robert M. Marshall; Molly M. Pohl; Susan J. Sferra; Mark K. Sogge; Julie C. Stromberg; Bradley A. Valentine; Mary J. Whitfield; Sartor O. Williams

    2002-01-01

    The Southwestern Willow Flycatcher Recovery Team is composed of a Technical Subgroup (pg. ii), six Implementation Subgroups (Appendix A), and a Tribal Working Group. The Technical Subgroup consists of 14 academic scientists, researchers, and resource managers with a wide range of expertise in avian biology and ecology, southwestern willow flycatcher ecology, cowbird...

  4. Building the Capacity of School Leaders and Teachers to Implement Reform at All Levels

    ERIC Educational Resources Information Center

    Southern Regional Education Board (SREB), 2010

    2010-01-01

    Leaders of successful high schools, middle grades schools and technology centers are strengthening their skills and involving the entire school in plans to raise student achievement. The best school leaders establish an environment of continuous progress in which teachers and leaders work together to upgrade curriculum and instruction, examine…

  5. Technology and Stress in the Workplace: The Role of the Consulting Psychologist.

    ERIC Educational Resources Information Center

    Cahill, Janet

    Poorly planned implementation of microcomputers has been shown to increase stress symptoms. Concerns have also been raised about the impact of new technology on the quality of the work environment. Programming expertise alone is not sufficient to prevent these problems. This paper therefore describes the role that psychologists can play in…

  6. Evaluation Action Plan for the Texas Workforce Development System. Revised.

    ERIC Educational Resources Information Center

    King, Christopher T.; McPherson, Robert E.

    Texas is shifting to an integrated, systems-oriented approach to providing work force services for its residents and employers in which all services are guided by a single mission and vision. Implementation strategies are clearly focused on achieving common results. Accountability means being able to ensure taxpayers, residents, employers, and…

  7. Project Portfolio Management for Academic Libraries: A Gentle Introduction

    ERIC Educational Resources Information Center

    Vinopal, Jennifer

    2012-01-01

    In highly dynamic, service-oriented environments like academic libraries, much staff time is spent on initiatives to implement new products and services to meet users' evolving needs. Yet even in an environment where a sound project management process is applied, if we're not properly planning, managing, and controlling the organization's work in…

  8. Business and Office Education Curriculum Guidelines. Bulletin No. 1246.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    The curriculum guide presents guidelines for planning and implementing a program in cooperative office education. Techniques include relating individual in-school instruction to individual job needs and career goals and to coordinate the student's education with actual work experience in an office in the community. A summary of Federal and State…

  9. 40 CFR 63.4710 - What notifications must I submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 63.9(h). (1) Company name and address. (2) Statement by a responsible official with that official's... section do not apply to solvent recovery systems for which you conduct liquid-liquid material balances... of whether or not you developed and implemented the work practice plan required by § 63.4693. ...

  10. 40 CFR 63.3510 - What notifications must I submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in § 63.9(h). (1) Company name and address. (2) Statement by a responsible official with that... which you conduct liquid-liquid material balances according to § 63.3541(i). (i) For each emission... those limits. (iv) A statement of whether or not you developed and implemented the work practice plan...

  11. 40 CFR 63.4110 - What notifications must I submit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... this section and the applicable information specified in § 63.9(h). (1) Company name and address. (2... solvent recovery systems for which you conduct liquid-liquid material balances according to § 63.4161(h... not you developed and implemented the work practice plan required by § 63.4093. (v) A statement of...

  12. Community College Professional Development: Sharing What Works. Proceedings of a National Conference (San Antonio, Texas, October 18-19, 1991).

    ERIC Educational Resources Information Center

    Faulkner, Susan L.; And Others

    This document contains 30 papers on professional development in community colleges. The following papers are included: "Effective Leadership Strategies for Planning and Implementing Tech Prep" (Bragg, Huffman); "Small Business Management-Tech Prep" (Harvey); "Educational Reform and the New Mission" (Hoerner);…

  13. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  14. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  15. 10 CFR Appendix A to Subpart B of... - General Statement of Safety Basis Policy

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... with DOE Policy 450.2A, “Identifying, Implementing and Complying with Environment, Safety and Health..., safety, and health into work planning and execution (48 CFR 970.5223-1, Integration of Environment...) Using the method in DOE-STD-1120-98, Integration of Environment, Safety, and Health into Facility...

  16. Comprehensive Cost Planning Yields Successful Tech Projects

    ERIC Educational Resources Information Center

    Breeding, Marshall

    2006-01-01

    In this article, the author calls for librarians to find ways to implement technology projects with very limited budgets and to consider all the cost components of a technology project amidst the economic pressures. The author offers some perspective on what is involved in trying to accomplish important work with limited resources while…

  17. Transition from School to Post-School Life for Individuals with Disabilities

    ERIC Educational Resources Information Center

    Levinson, Edward M.

    2004-01-01

    This book is designed to assist professionals in developing and implementing transition services for students with disabilities. Specifically, this book focuses on the importance of assessment in transition planning and targets the various domains that should be included in any school-to-work transition assessment. The book advocates a…

  18. Birth of the Four-Day Work Week.

    ERIC Educational Resources Information Center

    Hellyer, Lyle

    Indian Hills Community College, faced with rising utility bills dues to inadequate insulation in the campus's older buildings, now utilizes a four-day week during the winter quarter as an energy conservation measure. Planning for the implementation of the four-day week, which began in 1976, was coordinated by an overall energy committee made up of…

  19. Technological Change in the Workplace: A Statewide Survey of Community College Library and Learning Resources Personnel.

    ERIC Educational Resources Information Center

    Poole, Carolyn E.; Denny, Emmett

    2001-01-01

    Discussion of the effects of technostress on library personnel focuses on an investigation that examined how employees in Florida community college libraries and learning resources centers are dealing with technological change in their work environment. Considers implications for planning and implementing technological change and includes…

  20. 76 FR 45705 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Diesel-Powered Motor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-01

    ... following methods: A. http://www.regulations.gov . Follow the on-line instructions for submitting comments... the equipment is in good working order, if necessary as part of the inspection; (6) idling of a... off school property during queuing for the sequential discharge or pickup of students where the...

  1. Procedures for Developing an Inservice Industry/Education Exchange Program: Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Adams, Keith K.; Whiteman, Richard E.

    This report describes an in-service industry exchange project conducted by Cerritos College during which five faculty members returned to the work place to update their skills and gather information useful in curriculum development. First, the project's objectives are delineated, covering: (1) formation of the Project Advisory Committee and…

  2. 77 FR 34354 - Notice Inviting Informal Public Comment on Training and Technical Assistance and Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... and Technical Assistance and Disability Inclusion Programming AGENCY: Corporation for National and... implementation of a unified training and technical assistance (TTA) strategy and disability inclusion programming... to CNCS as we plan and prepare for this work. We will accept comments in writing, as described below...

  3. Forest fuels treatments for wildlife management: do local recreation users agree?

    Treesearch

    Jeamok Kwon; Christine Vogt; Greg Winter; Sarah McCaffrey

    2008-01-01

    In recent years, managers, policy makers and researchers, particularly in the social sciences, have worked to better understand the perspectives of homeowners, residents, tourists, and recreationists on wildfire and fuels management and how resource agencies can better involve these stakeholders in planning and implementation (Vogt et al., 2006). This research examined...

  4. 7 CFR 4274.338 - Loan agreements between the Agency and the intermediary.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... necessary to cover a 30-day period in implementing its approved work plan. Advances must be requested by the... by the intermediary. (ii) Ordinarily, life insurance, which may be decreasing term insurance, is... Agency following default by the intermediary, to the Agency. A schedule of life insurance available for...

  5. Contradictions in Collaboration: New Thinking on School/University Partnerships.

    ERIC Educational Resources Information Center

    Johnston, Marilyn A.

    This book is based on a 6-year longitudinal study of collaboration in a professional development school (PDS) project involving 45 educators. Teachers and principals from the schools and faculty and doctoral students from the university work together to plan, implement, and evaluate a Master's of Education program. Part 1: "Issues and Challenges…

  6. Training Teachers To Work in Schools Considered Difficult. Fundamentals of Educational Planning Series, Number 59.

    ERIC Educational Resources Information Center

    Auduc, Jean-Louis

    This book outlines challenges involved in ensuring that teacher training becomes the gateway to implementation of appropriate strategies for students to achieve and for managing the problems of authority, discipline, and aggressive behavior. The six chapters examine: (1) "Teaching in Schools or Classes Considered Difficult: A Contemporary…

  7. THE DESIGN OF A MAN-MACHINE COUNSELING SYSTEM. A PROFESSIONAL PAPER.

    ERIC Educational Resources Information Center

    COGSWELL, J.F.; AND OTHERS

    TWO PROJECTS ON THE DESIGN, DEVELOPMENT, IMPLEMENTATION, AND EVALUATION OF A MAN-MACHINE SYSTEM FOR COUNSELING IN THE PALO ALTO AND LOS ANGELES SCHOOL DISTRICTS ARE REPORTED. THE EARLIER PHILCO 2000 COMPUTER PROGRAMS SIMULATED A COUNSELOR'S WORK IN THE EDUCATIONAL PLANNING INTERVIEW BY ACCEPTING INPUTS SUCH AS SCHOOL GRADES, TEST SCORES, AND…

  8. Engaging Educators: Common Core State Standards Implementation

    ERIC Educational Resources Information Center

    Achieve, Inc., 2011

    2011-01-01

    To date, 44 states and the District of Columbia have adopted the Common Core State Standards (CCSS). Achieve has prepared this planning document to help all states in the American Diploma Project Network (ADP) and the Partnership for Assessment of Readiness for College and Careers (PARCC) consortium engage educators in the essential work of…

  9. Curriculum-Integrated Information Literacy (CIIL) in a Community College Nursing Program: A Practical Model

    ERIC Educational Resources Information Center

    Argüelles, Carlos

    2016-01-01

    This article describes a strategy to integrate information literacy into the curriculum of a nursing program in a community college. The model is articulated in four explained phases: preparatory, planning, implementation, and evaluation. It describes a collaborative process encouraging librarians to work with nursing faculty, driving students to…

  10. Using Course Assessments to Train Teachers in Functional Behavior Assessment and Behavioral Intervention Plan Techniques

    ERIC Educational Resources Information Center

    Fallon, Moira A.; Zhang, Jie; Kim, Eun-Joo

    2011-01-01

    As the need to train more teachers to work in inclusive classrooms increases, college instructors should identify and implement course assessments measuring their effectiveness in training practices. Skills in managing the challenging behaviors of students with disabilities, such as autism and emotional disturbances are important for teachers…

  11. The Application of Project Management Techniques to College and University Admissions Activities.

    ERIC Educational Resources Information Center

    Bickers, Doyle

    1993-01-01

    The process of project management is illustrated through application to one activity, development of a new brochure, within the admissions program of a fictional college. The project life cycle is described, and a work responsibility schedule, project completion schedule, and critical path chart are used as planning and implementation tools. (MSE)

  12. Fitting the Pieces: Education Reform That Works. Studies of Education Reform.

    ERIC Educational Resources Information Center

    Klein, Steven; And Others

    Nearly all school reforms, regardless of their scope or intended target, share a number of characteristics. This report reviews the essential elements of planning, implementing, and sustaining school reform and presents eight key lessons to guide prospective reformers. The lessons are drawn from 12 major studies of education reform funded by the…

  13. Design requirements for SRB production control system. Volume 4: Implementation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.

  14. Practical experience from the Office of Adolescent Health's large scale implementation of an evidence-based Teen Pregnancy Prevention Program.

    PubMed

    Margolis, Amy Lynn; Roper, Allison Yvonne

    2014-03-01

    After 3 years of experience overseeing the implementation and evaluation of evidence-based teen pregnancy prevention programs in a diversity of populations and settings across the country, the Office of Adolescent Health (OAH) has learned numerous lessons through practical application and new experiences. These lessons and experiences are applicable to those working to implement evidence-based programs on a large scale. The lessons described in this paper focus on what it means for a program to be implementation ready, the role of the program developer in replicating evidence-based programs, the importance of a planning period to ensure quality implementation, the need to define and measure fidelity, and the conditions necessary to support rigorous grantee-level evaluation. Published by Elsevier Inc.

  15. [On risk-oriented model of sanitary epidemiologic surveillance in occupational hygiene].

    PubMed

    Zaitseval, N V; Mai, I V; Kostarev, V G; Bashketova, N S

    2015-01-01

    In 2015, Federal Service on surveillance in consumers rights protection and public well-being set a task to organize planned work of regional agencies on basis of risk-oriented model of control and supervision. Based on results of pilot project in Rospotrebnadzor Department of Perm area and St-Petersburg, the article covers methodic approaches to classification of objects liable to surveillance in occupational hygiene. The classification considers possibility of sanitary law violation, severity of this violation consequences and number of workers exposed to risk factors including hazardous work conditions. The authors specified recommendations on periodicity and forms of planned inspections considering evaluation of potential risk for human health, determined problems that require solution in implementation of risk-oriented model of surveillance.

  16. Poverty reduction by improving health and social services in Vietnam.

    PubMed

    Gien, Lan; Taylor, Sharon; Barter, Ken; Tiep, Nguyen; Mai, Bui X; Lan, Nguyen T

    2007-12-01

    This article describes the development and implementation of a five-year plan for the reduction of poverty and the enhancement of human development through improving public health and social services in rural Vietnam. This plan was achieved by training the trainers and building capacity for the social workers. The project was a collaborative effort between the Schools of Nursing and Social Work at Memorial University, Newfoundland and Labrador, Canada and the University of Labor and Social Affairs, Hanoi, Vietnam. The collaboration was also committed to improving the quality of social work education and training in Vietnam. All the project's objectives were achieved beyond original expectations. The actual outcomes are sustainable and in addition gender equality has been a cross-cutting theme.

  17. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  18. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  19. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...

  20. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...

Top