Sample records for implementing construction project

  1. 18 CFR 4.96 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  2. 18 CFR 4.104 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  3. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    NASA Astrophysics Data System (ADS)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  4. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  5. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    NASA Astrophysics Data System (ADS)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  6. AASHTOWare Preconstruction Preliminary Investigation

    DOT National Transportation Integrated Search

    2017-12-17

    The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...

  7. Analysis of administrative barriers in the industry of the high-rise construction in Russian Federation

    NASA Astrophysics Data System (ADS)

    Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana

    2018-03-01

    The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.

  8. 42 CFR 137.362 - May construction project agreements be amended?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  9. Monitoring Environmental Performance Commitments in Construction Projects.

    DOT National Transportation Integrated Search

    2007-05-01

    EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....

  10. A review of BIM (Building Information Modeling) implementation in Indonesia construction industry

    NASA Astrophysics Data System (ADS)

    Suryadinata Telaga, Abdi

    2018-05-01

    Construction projects in Indonesia have been growing rapidly in the last three years. Therefore, construction management is very important to ensure completion of construction projects are within schedule and budget. Utilization of building information modeling (BIM) can increase the efficiency of a construction project. However, the implementation of BIM in Indonesia is still not known. This paper is intended to review the implementation of BIM in Indonesia through literature analysis. To find BIM articles in Indonesia, Firstly, searching was limited to English articles published in reputed journals or conferences. However the results were limited, then the search was expanded to the article using Indonesian languages that published in journal and conference. Based on the number of articles, the results showed that BIM research in Indonesia is still in a dearth. Furthermore, BIM study cases were conducted in a limited location and within a small population. Nevertheless, the literature shared the conclusion that BIM can increase project efficiency, but the implementation was hindered by high initial investment cost, inadequate human resources, small demand, and technology resistant. The research contributes to providing a current reported level of BIM implementation in Indonesia. In the future research to study of BIM implementation comprehensively in Indonesia is eminent.

  11. Evaluation of the implementation of the Montreal At Home/Chez Soi project.

    PubMed

    Fleury, Marie-Josée; Grenier, Guy; Vallée, Catherine

    2014-11-28

    Homelessness and mental disorders constitute a major problem in Canada. The purpose of the At Home/Chez Soi pilot project was to house and provide supports to marginalised groups. Policymakers are in a better position to nurture new, complex interventions if they know which key factors hinder or enable their implementation. This paper evaluates the implementation process for the Montreal site of this project. We collected data from 62 individuals, through individual interviews, focus groups, questionnaires, observations and documentation. The implementation process was analysed using a conceptual framework with five constructs: Intervention Characteristics (IC), Context of Implementation (CI), Implementation Process (IP), Organizational Characteristics (OC) and Strategies of Implementation (SI). The most serious obstacle to the project came from the CI construct, i.e., lack of support from provincial authorities and key local resources in the homelessness field. The second was within the OC construct. The chief hindrances were numerous structures, divergent values among stakeholders, frequent turnover of personnel and team leaders; lacking staff supervision and miscommunication. The third is related to IC: the complex, unyielding nature of the project undermined its chances of success. The greatest challenges from IP were the pressure to perform, along with stress caused by planning, deadlines and tension between teams. Conversely, SI construct conditions (e.g., effective governing structures, comprehensive training initiatives and toolkits) were generally very positive even with problems in power sharing and local leadership. For the four other constructs, the following proved useful: evidence of the project's scope and quality, great needs of services consolidation, generous financing and status as a research pilot project, enthusiasm and commitment toward the project, substantially improved services, and overall user satisfaction. This study demonstrated the difficulty of implementing a complex project in the healthcare system. While the project faced many barriers, minimal conditions were also achieved. At the end of the study period, major tensions between organizations and teams were significantly reduced, supporting its full implementation. However, in late 2013, the project was unsustainable, calling into question the relevance of achieving a significant number of positive conditions in each area of the framework.

  12. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  13. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    NASA Astrophysics Data System (ADS)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  14. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  15. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    NASA Astrophysics Data System (ADS)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  16. Financial and tax risks at implementation of "Chayanda- Lensk" section of "Sila Sibiri" gas transportation system construction project

    NASA Astrophysics Data System (ADS)

    Sharf, I. V.; Chukhareva, N. V.; Kuznetsova, L. P.

    2014-08-01

    High social and economic importance of large-scale projects on gasification of East Siberian regions of Russia and diversifying gas exports poses the problem of complex risk analysis of the project. This article discusses the various types of risks that could significantly affect the timing of the implementation and effectiveness of the project for the construction of the first line of "Sila Sibiri", the "Chayanda-Lensk" section. Special attention is paid to financial and tax aspects of the project. Graphically presented analysis of the dynamics of financial indicators reflect certain periods of effectiveness in implementing the project. Authors also discuss the possible causes and consequences of risks.

  17. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    NASA Astrophysics Data System (ADS)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  18. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  19. Develop an asset management tool for collecting and tracking commitments on selected environmental mitigation features.

    DOT National Transportation Integrated Search

    2009-05-01

    Wisconsin has constructed many environmental mitigation projects in conjunction with transportation projects that have been implemented according : to the National Environmental Policy Act. Other mitigation projects have been constructed pursuant to ...

  20. Potential implementation of light steel housing system for affordable housing project in Malaysia

    NASA Astrophysics Data System (ADS)

    Saikah, M.; Kasim, N.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. A.

    2017-11-01

    An unparalleled number between housing demand and housing supply in Malaysia has increased the housing prices, which gives consequences to the homeownership issue. One way to reduce the housing price is by faster increase the number of affordable housing, but the construction sector faces difficulties in delivering as expected number by using conventional and current industrialised building system (IBS) due to the issue related high project cost, time and labour. Therefore, light steel housing (LSH) system as one of another type of IBS method can be utilised in housing construction project. This method can replace the conventional method that was currently used in the construction of affordable housing project. The objectives of this study are to identify the potential of LSH and influencing factors of system implementation. This is an initial stage to review the previous study related to LSH implementation in developed and developing countries. The previous study will be analysed regarding advantages and disadvantages of LSH and factors that influence the implementation of the system. Based on the literature review it is expected to define the potential and influencing factors of the LSH system. The findings are meaningful in framing and enhance construction housing method of an affordable housing project in Malaysia.

  1. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  2. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ...) from construction, operation, maintenance, and decommissioning associated with the Buckeye Wind Power... construction, operation, maintenance, and decommissioning of the project. The project consists of a 100-turbine... Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County, Ohio AGENCY: Fish and...

  3. A quantitative analysis study on the implementation of partnering in the design and build construction project

    NASA Astrophysics Data System (ADS)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  4. Adapting the Consolidated Framework for Implementation Research to Create Organizational Readiness and Implementation Tools for Project ECHO.

    PubMed

    Serhal, Eva; Arena, Amanda; Sockalingam, Sanjeev; Mohri, Linda; Crawford, Allison

    2018-03-01

    The Project Extension for Community Healthcare Outcomes (ECHO) model expands primary care provider (PCP) capacity to manage complex diseases by sharing knowledge, disseminating best practices, and building a community of practice. The model has expanded rapidly, with over 140 ECHO projects currently established globally. We have used validated implementation frameworks, such as Damschroder's (2009) Consolidated Framework for Implementation Research (CFIR) and Proctor's (2011) taxonomy of implementation outcomes, combined with implementation experience to (1) create a set of questions to assess organizational readiness and suitability of the ECHO model and (2) provide those who have determined ECHO is the correct model with a checklist to support successful implementation. A set of considerations was created, which adapted and consolidated CFIR constructs to create ECHO-specific organizational readiness questions, as well as a process guide for implementation. Each consideration was mapped onto Proctor's (2011) implementation outcomes, and questions relating to the constructs were developed and reviewed for clarity. The Preimplementation list included 20 questions; most questions fall within Proctor's (2001) implementation outcome domains of "Appropriateness" and "Acceptability." The Process Checklist is a 26-item checklist to help launch an ECHO project; items map onto the constructs of Planning, Engaging, Executing, Reflecting, and Evaluating. Given that fidelity to the ECHO model is associated with robust outcomes, effective implementation is critical. These tools will enable programs to work through key considerations to implement a successful Project ECHO. Next steps will include validation with a diverse sample of ECHO projects.This is an open-access article distributed under the terms of the Creative Commons Attribution-Non Commercial-No Derivatives License 4.0 (CCBY-NC-ND), where it is permissible to download and share the work provided it is properly cited. The work cannot be changed in any way or used commercially without permission from the journal.

  5. Interstate 64 traffic response assessment : staff summary.

    DOT National Transportation Integrated Search

    2009-12-01

    An evaluation was conducted of the implemented mobility strategy on the New I-64 : construction project. This construction project will improve more than 10 miles of an : urban Interstate that carries daily traffic volumes approaching 170,000 vehicle...

  6. Benefit Evaluation of Implementing BIM in Construction Projects

    NASA Astrophysics Data System (ADS)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  7. Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects

    NASA Astrophysics Data System (ADS)

    Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena

    2017-07-01

    Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.

  8. Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

    NASA Astrophysics Data System (ADS)

    Rani, Hafnidar A.

    2016-11-01

    The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.

  9. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  10. Systematic procedures to determine incentive/disincentive dollar amounts for highway transportation construction projects [research brief].

    DOT National Transportation Integrated Search

    2012-06-01

    The Federal Highway Administration (FHWA) has encouraged state transportation agencies (STAs) to implement Incentive/Disincentive (I/D) contracting provisions for early project completion to minimize traffic disruption during highway construction. Th...

  11. 42 CFR 137.368 - Is the Secretary responsible for oversight and compliance of health and safety codes during...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... compliance of health and safety codes during construction projects being performed by a Self-Governance Tribe... SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and Implementing Construction Project Agreements § 137.368 Is the Secretary responsible for oversight and compliance of health...

  12. Implementation of project based learning on the Prakerin subject of vocational high school students of the building engineering to enhance employment skill readiness of graduates in the construction services field

    NASA Astrophysics Data System (ADS)

    Sugandi, Machmud

    2017-09-01

    Implementation of the Prakerin subject in the field of Building Engineering study program in vocational high school (VHS) are facing many issues associated to non-compliance unit of work in the industry and the expected competencies in learning at school. Project Based Learning (PBL) is an appropriate model learning used for Prakerin subject to increase student competence as the extension of the Prakerin implementation in the construction industry services. Assignments based on the selected project during their practical industry work were given to be completed by student. VHS students in particular field of Building Engineering study program who has been completed Prakerin subject will have a better job readiness, and therefore they will have an understanding on the knowledge, skills, and attitudes and good vision on the construction project in accordance with their experience during Prakerin work in the industry.

  13. Financial auditing at enterprises for control of projects realized with credit fund-raising

    NASA Astrophysics Data System (ADS)

    Lukmanova, Inessa

    2017-10-01

    The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.

  14. Graphing the Past

    ERIC Educational Resources Information Center

    Clary, Renee; Wandersee, James

    2014-01-01

    Renee Clary and James Wandersee implemented the Stratigraphy and Data Interpretation Project described in this article when they recognized that some students were having difficulties constructing appropriate graphics and interpreting their constructed graphics for an earlier mathematics-science project in their classrooms. They also previously…

  15. Evaluation of data requirements for computerized constructability analysis of pavement rehabilitation projects.

    DOT National Transportation Integrated Search

    2013-08-01

    This research aimed to evaluate the data requirements for computer assisted construction planning : and staging methods that can be implemented in pavement rehabilitation projects in the state of : Georgia. Results showed that two main issues for the...

  16. Effective factor of virtual team: Resolving communication breakdown in IBS construction project

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.

    2016-08-01

    Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.

  17. 42 CFR 137.350 - Is a Self-Governance Tribe responsible for completing a construction project in accordance with...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe responsible for... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in Establishing and Implementing Construction Project Agreements § 137.350 Is a Self...

  18. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  19. Extensive Evaluation of Using a Game Project in a Software Architecture Course

    ERIC Educational Resources Information Center

    Wang, Alf Inge

    2011-01-01

    This article describes an extensive evaluation of introducing a game project to a software architecture course. In this project, university students have to construct and design a type of software architecture, evaluate the architecture, implement an application based on the architecture, and test this implementation. In previous years, the domain…

  20. Teacher change in implementing a research-developed representation construction pedagogy

    NASA Astrophysics Data System (ADS)

    Hubber, Peter; Chittleborough, Gail

    2016-05-01

    The Representations in Learning Science (RiLS) project developed a representation construction approach to teaching and learning in science, which has successfully demonstrated enhanced student learning through sustained engagement with ideas, and enhancement of teachers' pedagogical knowledge and understandings of how knowledge in science is developed and communicated. The current Constructing Representations in Science Pedagogy (CRISP) project aims at wider scale implementation of the representation construction approach. This paper explores a range of issues that confronted four Year-8 teachers in implementing this research-developed approach, such as: preparedness of the teacher in terms of epistemological positioning and positioning as a learner, significant support for planning and modelling by the university expert, and a team ethos where teachers share ideas and plan jointly. The Year-8 teachers implemented a representation construction approach to the teaching of the topic of astronomy. The Interconnected Model of Teacher Growth (IMTG) (Clarke and Hollingworth, Teach. Educ., 18 (2001) 947) was used to analyse the teachers' experience in planning and delivering the teaching sequence. This model was found to be flexible in identifying the experiences of teachers in different situations and useful in identifying issues for implementation of a research-developed pedagogy.

  1. Implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction

    NASA Astrophysics Data System (ADS)

    Orlov, Alexandr K.

    2017-10-01

    The article deals with the application of sustainable construction concept within implementation of megaprojects of tourist clusters development using energy saving technologies. The concept of sustainable construction includes the elements of green construction, energy management as well as aspects of the economic efficiency of construction projects implementation. The methodical approach to the implementation of megaprojects for the creation of tourist clusters in Russia based on the concept of energy efficiency and sustainable construction is proved. The conceptual approach to the evaluation of the ecological, social and economic components of the integral indicator of the effectiveness of the megaproject for the development of the tourist cluster is provided. The algorithm for estimation of the efficiency of innovative solutions in green construction is considered.

  2. Construction machine control guidance implementation strategy.

    DOT National Transportation Integrated Search

    2010-07-01

    Machine Controlled Guidance (MCG) technology may be used in roadway and bridge construction to improve construction efficiencies, potentially resulting in reduced project costs and accelerated schedules. The technology utilizes a Global Positioning S...

  3. Towards Implementation of Green Technology in Sabah Construction Industry

    NASA Astrophysics Data System (ADS)

    Azland Jainudin, Noor; Jugah, Ivy; Nasrizal Awang Ali, Awang; Tawie, Rudy

    2017-12-01

    The construction industry in Sabah is one of the major roles for development of social, economic infrastructures and buildings in generating wealth to the state besides the tourism sector. The increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. The objective of the research is to identify the awareness and implementation of green technology in construction industry in Kota Kinabalu, Sabah. The methodology of the research is through distributing the questionnaire to the contractors, developers, consultants, architects and state government agencies to the area in Kota Kinabalu only. The questionnaires had been analysed to find out the mean value. 100 questionnaires distributed to the respondents but merely 85 questionnaires collected have been analysed. Based on the findings, 83.5% organisations were aware with the concept of green technology in construction project. In terms of the implementation only 64.7% had been implemented in their organizations. More than 50% from the major players such as contractors, consultants, developers, architects and state government agencies were aware based on six green technology concepts in their organizations. As a conclusion, the awareness towards green policy concept in construction industry is very satisfied. Meanwhile, in terms of implementation need to be increased the number of organizations to be involved in green technology in construction industry.

  4. Best practices of Building Information Modelling (BIM) implementation in design phase for construction project

    NASA Astrophysics Data System (ADS)

    Kasim, N.; Zainal Abidin, N. A.; Zainal, R.; Sarpin, N.; Rahim, M. H. I. Abd; Saikah, M.

    2017-11-01

    Implementation of Building Information Modelling (BIM) was expected to bring improvement in current practices of Malaysian construction industry. In the design phase, there is a lack of a ready pool of skilled workers who are able to develop BIM strategic plan and effectively utilise it. These create boundaries for BIM nature in Malaysian construction industry specifically in the design phase to achieve its best practices. Therefore, the objectives of this research are to investigate the current practices of BIM implementation in the design phase as well as the best practices factors of BIM implementation in the design phase. The qualitative research approach is carried out through semi-structured interviews with the designers of different organisations which adopt BIM in the design phase. Data collection is analysed by executing content analysis method. From the findings, the best practices factors of BIM implementation in design phase such as the incentive for BIM training, formal approach to monitoring automated Level of Detailing (LOD), run a virtual meeting and improve Industry Foundation Class (IFC). Thus, best practices factors which lead to practices improvements in the design phase of project development which subsequently improves the implementation of BIM in the design phase of Malaysian construction industry.

  5. Report of CEC Study Committee on Construction Management.

    ERIC Educational Resources Information Center

    Consulting Engineers Council of the U.S., Washington, DC.

    Changing times place new demands on those involved in the implementation of construction projects. Within a relatively few years, the size and complexity of projects has grown substantially. Environmental and other public and social considerations are increasingly significant. With growing complexity, the requirements for effective project…

  6. Utilization of building information modeling in infrastructure’s design and construction

    NASA Astrophysics Data System (ADS)

    Zak, Josef; Macadam, Helen

    2017-09-01

    Building Information Modeling (BIM) is a concept that has gained its place in the design, construction and maintenance of buildings in Czech Republic during recent years. This paper deals with description of usage, applications and potential benefits and disadvantages connected with implementation of BIM principles in the preparation and construction of infrastructure projects. Part of the paper describes the status of BIM implementation in Czech Republic, and there is a review of several virtual design and construction practices in Czech Republic. Examples of best practice are presented from current infrastructure projects. The paper further summarizes experiences with new technologies gained from the application of BIM related workflows. The focus is on the BIM model utilization for the machine control systems on site, quality assurance, quality management and construction management.

  7. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

  8. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  9. I-15 North Project

    DOT National Transportation Integrated Search

    2013-11-05

    Goals of this project were as follows: (1) Conduct a comprehensive evaluation study on Nevada's I-15 North Design Build Project; (2) Analyze project implementation with respect to construction zone rules by which the contractor had to abide; (3) Anal...

  10. Bridge deck fogging system : evaluation of field implementation of a fogging system used during bridge deck construction.

    DOT National Transportation Integrated Search

    2008-01-01

    The objective of this research was to implement and evaluate a fogging system used to provide initial cure for a concrete bridge deck construction project. To accomplish this, Bridges 5500 and 5701 along NM26 were selected. Bridge 5500 was placed usi...

  11. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  12. Implementation of GPS controlled highway construction equipment.

    DOT National Transportation Integrated Search

    2007-04-01

    dozers, motor graders, and excavators is quickly becoming common place in private sector construction because it speeds project delivery and cuts costs. Use of this technology is expanding quickly into other construction equipment areas such as paver...

  13. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  14. De-mystifying earned value management for ground based astronomy projects, large and small

    NASA Astrophysics Data System (ADS)

    Norton, Timothy; Brennan, Patricia; Mueller, Mark

    2014-08-01

    The scale and complexity of today's ground based astronomy projects have justifiably required Principal Investigator's and their project teams to adopt more disciplined management processes and tools in order to achieve timely and accurate quantification of the progress and relative health of their projects. Earned Value Management (EVM) is one such tool. Developed decades ago and used extensively in the defense and construction industries, and now a requirement of NASA projects greater than $20M; EVM has gained a foothold in ground-based astronomy projects. The intent of this paper is to de-mystify EVM by discussing the fundamentals of project management, explaining how EVM fits with existing principles, and describing key concepts every project can use to implement their own EVM system. This paper also discusses pitfalls to avoid during implementation and obstacles to its success. The authors report on their organization's most recent experience implementing EVM for the GMT-Consortium Large Earth Finder (G-CLEF) project. G-CLEF is a fiber-fed, optical echelle spectrograph that has been selected as a first light instrument for the Giant Magellan Telescope (GMT), planned for construction at the Las Campanas Observatory in Chile's Atacama Desert region.

  15. Environmental commitment follow-up.

    DOT National Transportation Integrated Search

    2005-03-01

    Three recently completed road construction projects were investigated to determine Kentucky Transportation Cabinet (KYTC) effectiveness in implementing project commitments (including environmental commitments). Documentation was obtained from KYTC di...

  16. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, Philip

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  17. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  18. Use of formwork systems in high-rise construction

    NASA Astrophysics Data System (ADS)

    Kurakova, Oksana

    2018-03-01

    Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  19. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  20. Urban construction and safety project

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The purpose and functions of NASA technology applications temas (TAT) are described, with emphasis on the activities of the Urban and Construction and Safety Project. The transfer and implementation of technology is discussed in five activities. Topics include: flat conductor cable, NASA house and compendium, flood insurance studies, tornado studies, and the controller for stationary diesels.

  1. 75 FR 16825 - Notice of Modifications to U.S. Commitments Under the World Trade Organization Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... hearing- or speech-impairments may access this number through TTY by calling the toll-free Federal... construction project, and the total construction project has an estimated value of more than $7,804,000....S. Commitments Under the World Trade Organization Government Procurement Agreement To Implement...

  2. Formation of integrated structural units using the systematic and integrated method when implementing high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Abramov, Ivan

    2018-03-01

    Development of design documentation for a future construction project gives rise to a number of issues with the main one being selection of manpower for structural units of the project's overall implementation system. Well planned and competently staffed integrated structural construction units will help achieve a high level of reliability and labor productivity and avoid negative (extraordinary) situations during the construction period eventually ensuring improved project performance. Research priorities include the development of theoretical recommendations for enhancing reliability of a structural unit staffed as an integrated construction crew. The author focuses on identification of destabilizing factors affecting formation of an integrated construction crew; assessment of these destabilizing factors; based on the developed mathematical model, highlighting the impact of these factors on the integration criterion with subsequent identification of an efficiency and reliability criterion for the structural unit in general. The purpose of this article is to develop theoretical recommendations and scientific and methodological provisions of an organizational and technological nature in order to identify a reliability criterion for a structural unit based on manpower integration and productivity criteria. With this purpose in mind, complex scientific tasks have been defined requiring special research, development of corresponding provisions and recommendations based on the system analysis findings presented herein.

  3. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    NASA Astrophysics Data System (ADS)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  4. Performance evaluation of court in construction claims settlement of litigation

    NASA Astrophysics Data System (ADS)

    Hayati, Kemala; Latief, Yusuf; Rarasati, Ayomi Dita; Siddik, Arief

    2017-06-01

    Claim construction has a major influence on the implementation of projects, such as the cost and time. The success of the construction project is highly dependent on the effective resolution of claims. Although it has been recognized that litigation or court is not the best way because it may reduce or eliminate profits and damage the relationship, it is a method of resolving claims and disputes that is common in the world of construction. The method of resolving claims and disputes through litigation or court may solve the problem in an alternative method, namely the implementation of the judgment which can be enforced effectively against the losing party and the ruling which has the force of law of the country where the claims and disputes are examined. However, litigation or court may take longer time and require high cost. Thus, it is necessary to identify factors affecting the performance of the court and to develop a system capable of improving an existing system in order to run more effectively and efficiently. Resolution in the claims management of construction projects with the method of litigation is a procedure that can be used by the courts in order to shorten the time in order to reduce the cost. The scope of this research is directed to all parties involved in the construction, both the owners and the contractors as implementers and practitioners, as well as experts who are experienced in construction law.

  5. Electronic construction collaboration system : phase III.

    DOT National Transportation Integrated Search

    2011-12-01

    This phase of the electronic collaboration project involved two major efforts: 1) implementation of AEC Sync (formerly known as Attolist), a web-based project management system (WPMS), on the Broadway Viaduct Bridge Project and the Iowa Falls Arch Br...

  6. Experience gained at the Ural Turbine Works with retrofitting steam turbine units for thermal power stations

    NASA Astrophysics Data System (ADS)

    Valamin, A. E.; Kultyshev, A. Yu.; Gol'dberg, A. A.; Shibaev, T. L.; Paneque Aguilera, H. C.

    2013-08-01

    Examples of projects on retrofitting, modernizing, and renovating steam turbine units at thermal power stations implemented with participation of the Ural Turbine Works are given. Advanced construction and layout solutions were used in implementing these projects both on the territory of Russia and abroad.

  7. Identifying critical success factors (CSFs) of implementing building information modeling (BIM) in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Yaakob, Mazri; Ali, Wan Nur Athirah Wan; Radzuan, Kamaruddin

    2016-08-01

    Building Information Modeling (BIM) is defined as existing from the earliest concept to demolition and it involves creating and using an intelligent 3D model to inform and communicate project decisions. This research aims to identify the critical success factors (CSFs) of BIM implementation in Malaysian construction industry. A literature review was done to explore previous BIM studies on definitions and history of BIM, construction issues, application of BIM in construction projects as well as benefits of BIM. A series of interviews with multidisciplinary Malaysian construction experts will be conducted purposely for data collection process guided by the research design and methodology approach of this study. The analysis of qualitative data from the process will be combined with criteria identified in the literature review in order to identify the CSFs. Finally, the CSFs of BIM implementation will be validated by further Malaysian industrialists during a workshop. The validated CSFs can be used as a term of reference for both Malaysian practitioners and academics towards measuring BIM effectiveness level in their organizations.

  8. A Proposal for the use of the Consortium Method in the Design-build system

    NASA Astrophysics Data System (ADS)

    Miyatake, Ichiro; Kudo, Masataka; Kawamata, Hiroyuki; Fueta, Toshiharu

    In view of the necessity for efficient implementation of public works projects, it is expected to utilize advanced technical skills of private firms, for the purpose of reducing project costs, improving performance and functions of construction objects, and reducing work periods, etc. The design-build system is a method to order design and construction as a single contract, including design of structural forms and main specifications of the construction object. This is a system in which high techniques of private firms can be utilized, as a means to ensure qualities of design and construction, rational design, and efficiency of the project. The objective of this study is to examine the use of a method to form a consortium of civil engineering consultants and construction companies, as it is an issue related to the implementation of the design-build method. Furthermore, by studying various forms of consortiums to be introduced in future, it proposes procedural items required to utilize this method, during the bid and after signing a contract, such as the estimate submission from the civil engineering consultants etc.

  9. 24 CFR 1003.509 - Force account construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Force account construction. 1003... Administration § 1003.509 Force account construction. (a) The use of tribal work forces for construction or... Area ONAP before the start of project implementation. In reviewing requests for an approval of force...

  10. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    NASA Astrophysics Data System (ADS)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  11. High-rise construction as a method for architectural development of megapolises

    NASA Astrophysics Data System (ADS)

    Kankhva, Vadim

    2018-03-01

    The article analyzes the current state of urban development in Moscow, there are revealed the insights into pattern of large investment projects. The regulatory framework as well as the state and the forecast of housing funds are scrutinized. A number of problems, that are related to the implementation of high-rise construction projects at all stages of the life cycles, are highlighted by the example of unique facilities, which are under construction or have already been built. Substantiation of high-rise construction by the transport hubs in megapolises is given. There are also considered main advantages of Moscow renovation project and criticism against it.

  12. Effective and efficient implementation of alternative project delivery : research summary.

    DOT National Transportation Integrated Search

    2017-05-01

    Alternative project delivery (APD) methods such as Design Build (DB) and Construction Manager at Risk (CMAR), are used by state departments of transportation to improve the efficiency and effectiveness of project delivery. The Maryland Department of ...

  13. Case study for implementing RECIPPE as a quality control in construction projects.

    DOT National Transportation Integrated Search

    2008-04-01

    The quality of construction is a very important factor in the life-cycle performance of flexible pavements. This is particularly true of the individual characteristics of construction and their relative effect on life-cycle performance of the pavemen...

  14. 23 CFR 940.13 - Project administration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project administration. 940.13 Section 940.13 Highways... INTELLIGENT TRANSPORTATION SYSTEM ARCHITECTURE AND STANDARDS § 940.13 Project administration. (a) Prior to authorization of highway trust funds for construction or implementation of ITS projects, compliance with § 940...

  15. Electronic construction collaboration system -- final phase.

    DOT National Transportation Integrated Search

    2014-09-01

    This phase of the research project involved two major efforts: (1) Complete the implementation of AEC-Sync (formerly known as : Attolist) on the Iowa Falls Arch Bridge project and (2) develop a WPMS for projects under $10 million. : For the first maj...

  16. Curriculum Guide Construction Cluster.

    ERIC Educational Resources Information Center

    Kline, Ken

    As part of a model construction cluster curriculum development project, this guide was developed and implemented in the Beaverton (Oregon) School District. The curriculum guide contains 16 units covering the following topics: introduction to construction jobs; safety and first aid; blueprint readings; basic mathematics; site work; framing; roofing…

  17. Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.

    PubMed

    Hasan, Abid; Jha, Kumar Neeraj

    2013-01-01

    Safety incentive and penalty (I/P) provisions in construction contracts are one of the most common forms of I/P. Contradictory opinions on the effectiveness of these provisions have been expressed in the literature. Statistics on safety provisions were collected from 32 construction projects, which include both types of contracts - those with safety I/P provisions and those without them. Although inclusion of safety I/P provisions in contracts helps in improving the overall safety performance in construction projects, further scope for improvement still exists. Literature review and structured personal interviews, coupled with a survey based on preliminary questionnaire, revealed that successful formulation and implementation of such provisions are dependent on 25 attributes which need the attention of both clients and contractors. A questionnaire-based survey was conducted to evaluate these attributes. The six factors extracted by carrying out factor analysis are: incentive distribution method, proper labour training, special attention to risky situations, role of safety committee and sub-contractors, specialised works and safety equipments, and right form of I/P. If taken care of, these attributes have the potential to improve the safety performance in construction projects. The results would be useful to clients and contractors in implementing the safety I/P provisions and thereby improving safety performance.

  18. Critical factors of implementing Industrialised Building System in Sarawak: A research on SMEs

    NASA Astrophysics Data System (ADS)

    Hadi, N. A.; Muhamad, W. M. N. W.; Othman, M. K. F.

    2017-05-01

    Industrialised Building System (IBS) have been adopted in Malaysia for over five decades and is expected to grow consistent with Malaysia's economic development. In promoting the adoption of IBS in construction projects, the government has taken several steps such as levy exemption for contractors and developers. Despite its numerous advantages and efforts pulled by the government, the implementation and adoption of IBS are still below the expected figure. Many researchers investigated readiness, setbacks and issues related to the implementation of IBS in Malaysia's construction projects. However, most of the research mainly for projects located in urban areas of West Malaysia. Therefore, this paper aims to close the gap on factors affecting the implementation of IBS for SMEs in Sarawak, where the level urbanisation is low. A semi-structured interview was conducted with 10 SME's contractors to get better insight view. The study found that logistics and infrastructure problems, a limited number of the manufacturer, lack of incentive, conventional payment methods, lack of financial supports are among critical factors affecting the implementation of IBS. Therefore, it was concluded that government plays major role in providing supports, incentives and facilitating the improvement of infrastructure to successfully implementing IBS in Sarawak.

  19. The Small Helm Project: an academic activity addressing international corruption for undergraduate civil engineering and construction management students.

    PubMed

    Benzley, Steven E

    2006-04-01

    This paper presents an academic project that addresses the issue of international corruption in the engineering and construction industry, in a manner that effectively incorporates several learning experiences. The major objectives of the project are to provide the students a learning activity that will 1) make a meaningful contribution within the disciplines being studied; 2) teach by experience a significant principle that can be valuable in numerous situations during an individual's career, and 3) engage the minds, experiences, and enthusiasm of the participants in a real ethical challenge that is prevalent in all of their chosen professional fields. The paper describes the full details of the project, the actual implementation of it during Winter Semester 2005, the experiences gained during the initial trial, and the modifications and improvements incorporated for future implementation.

  20. A Human Systems Integration Approach to Energy Efficiency in Ground Transportation

    DTIC Science & Technology

    2015-12-01

    Granite Construction Organizational Structure .........................................53 Figure 7. A Comparison of USMC Structure to Granite Construction...Caterpillar Corporation and the implementation and use of their telematics systems within a company called Granite Construction. Granite Construction...profit over 250 million dollars annually. In addition, similar to the USMC, Granite Construction handles both large and small scale projects in a

  1. Project management practice and its effects on project success in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  2. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.

    PubMed

    Hu, Wenfa; He, Xinhua

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  3. Impacts and benefits of implementing BIM on bridge infrastructure projects.

    DOT National Transportation Integrated Search

    2014-10-01

    To date, BIM (Building Information Modeling) is not widely utilized in infrastructure asset management. : Benefits achieved through implementation in vertical construction, however, suggest that BIM represents : significant opportunity for gains in p...

  4. Project Delivery Methods and Contracting Approaches Available for Implementation by the Texas Department of Transportation

    DOT National Transportation Integrated Search

    2001-10-01

    Public agencies across the country are pursuing innovative project delivery methods such as design-build (D-B) and construction manager-at-risk (CM-at-risk) to improve cycle-time performance on projects, and numerous transportation departments are cu...

  5. 49 CFR 256.7 - Financial assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... passenger terminal, under subsection 4(i)(2) of the Act, may be expended for the following project costs incurred after the date of final project approval: (1) Acquisition or long-term lease of real property or... project implementation; (2) Final architectural and engineering construction documentation, including all...

  6. MDOT implementation plan for GPS technology in planning, design, and construction delivery

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  7. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  8. Implementation of GPS controlled highway construction equipment, phase III.

    DOT National Transportation Integrated Search

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  9. Construction of crack-free bridge decks.

    DOT National Transportation Integrated Search

    2017-04-01

    This serves as the final report on Transportation Pooled-Fund Program Project No. TPF-5(174), Construction : of Crack-Free Bridge Decks. The goal of the study was to implement the most cost-effective techniques for : improving bridge deck life ...

  10. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  11. Implementation of the Port Hope Area Initiative Biophysical and Socioeconomic Environmental Assessment Follow-up Programs - 13209

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baba, Nina; Friedmann, Karyn; Groulx, Charles

    2013-07-01

    The Port Hope Initiative (PHAI) involves the cleanup of historic low-level radioactive waste in various locations throughout the communities of Port Hope and Clarington, Ontario, as well as the construction of two engineered aboveground mounds for safe long-term management. The PHAI is comprised of two major projects - the Port Hope Project and the Port Granby Project. An Environmental Assessment (EA) was undertaken for each project and as a result EA Follow-up Programs were developed and are being implemented addressing both biophysical and socioeconomic aspects. This paper provides insight on elements of the EA Follow-up Program development, and its implementation.more » (authors)« less

  12. Advocating mindset for cooperative partnership for better future of construction industry

    NASA Astrophysics Data System (ADS)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  13. 36 CFR 294.23 - Road construction and reconstruction in Idaho Roadless Areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... safety; (v) Road reconstruction is needed to implement a road safety improvement project on a road... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Road construction and..., DEPARTMENT OF AGRICULTURE SPECIAL AREAS Idaho Roadless Area Management § 294.23 Road construction and...

  14. 76 FR 15970 - Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ...-kilovolt Transmission Line Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the... consists of constructing a new 500-kV single- circuit transmission line from BPA's new Central Ferry...

  15. [Principles and methodology for ecological rehabilitation and security pattern design in key project construction].

    PubMed

    Chen, Li-Ding; Lu, Yi-He; Tian, Hui-Ying; Shi, Qian

    2007-03-01

    Global ecological security becomes increasingly important with the intensive human activities. The function of ecological security is influenced by human activities, and in return, the efficiency of human activities will also be affected by the patterns of regional ecological security. Since the 1990s, China has initiated the construction of key projects "Yangtze Three Gorges Dam", "Qinghai-Tibet Railway", "West-to-East Gas Pipeline", "West-to-East Electricity Transmission" and "South-to-North Water Transfer" , etc. The interaction between these projects and regional ecological security has particularly attracted the attention of Chinese government. It is not only important for the regional environmental protection, but also of significance for the smoothly implementation of various projects aimed to develop an ecological rehabilitation system and to design a regional ecological security pattern. This paper made a systematic analysis on the types and characteristics of key project construction and their effects on the environment, and on the basis of this, brought forward the basic principles and methodology for ecological rehabilitation and security pattern design in this construction. It was considered that the following issues should be addressed in the implementation of a key project: 1) analysis and evaluation of current regional ecological environment, 2) evaluation of anthropogenic disturbances and their ecological risk, 3) regional ecological rehabilitation and security pattern design, 4) scenario analysis of environmental benefits of regional ecological security pattern, 5) re-optimization of regional ecological system framework, and 6) establishment of regional ecosystem management plan.

  16. MDOT implementation plan for global positioning systems (GPS) technology in planning, design, and construction delivery.

    DOT National Transportation Integrated Search

    2010-09-13

    Global Positioning System (GPS) technology offers advantages to transportation agencies in the planning, design and construction stages of project delivery. This research study will develop a guide for Mississippi Department of Transportation (MDOT) ...

  17. Criteria for implementing full-width/depth shoulders to accommodate hard shoulder running.

    DOT National Transportation Integrated Search

    2011-08-22

    "WisDOT is considering constructing full-width/depth shoulders along certain freeway segments to carry traffic : during future freeway resurfacing or construction projects. The goal of this measure is to minimize lane closures and : congestion. WisDO...

  18. Developing a Common Framework for Evaluating the Implementation of Genomic Medicine Interventions in Clinical Care: The IGNITE Network’s Common Measures Working Group

    PubMed Central

    Orlando, Lori A.; Sperber, Nina R.; Voils, Corrine; Nichols, Marshall; Myers, Rachel A.; Wu, R. Ryanne; Rakhra-Burris, Tejinder; Levy, Kenneth D.; Levy, Mia; Pollin, Toni I.; Guan, Yue; Horowitz, Carol R.; Ramos, Michelle; Kimmel, Stephen E.; McDonough, Caitrin W.; Madden, Ebony B.; Damschroder, Laura J.

    2017-01-01

    Purpose Implementation research provides a structure for evaluating the clinical integration of genomic medicine interventions. This paper describes the Implementing GeNomics In PracTicE (IGNITE) Network’s efforts to promote: 1) a broader understanding of genomic medicine implementation research; and 2) the sharing of knowledge generated in the network. Methods To facilitate this goal the IGNITE Network Common Measures Working Group (CMG) members adopted the Consolidated Framework for Implementation Research (CFIR) to guide their approach to: identifying constructs and measures relevant to evaluating genomic medicine as a whole, standardizing data collection across projects, and combining data in a centralized resource for cross network analyses. Results CMG identified ten high-priority CFIR constructs as important for genomic medicine. Of those, eight didn’t have standardized measurement instruments. Therefore, we developed four survey tools to address this gap. In addition, we identified seven high-priority constructs related to patients, families, and communities that did not map to CFIR constructs. Both sets of constructs were combined to create a draft genomic medicine implementation model. Conclusion We developed processes to identify constructs deemed valuable for genomic medicine implementation and codified them in a model. These resources are freely available to facilitate knowledge generation and sharing across the field. PMID:28914267

  19. Developing a common framework for evaluating the implementation of genomic medicine interventions in clinical care: the IGNITE Network's Common Measures Working Group.

    PubMed

    Orlando, Lori A; Sperber, Nina R; Voils, Corrine; Nichols, Marshall; Myers, Rachel A; Wu, R Ryanne; Rakhra-Burris, Tejinder; Levy, Kenneth D; Levy, Mia; Pollin, Toni I; Guan, Yue; Horowitz, Carol R; Ramos, Michelle; Kimmel, Stephen E; McDonough, Caitrin W; Madden, Ebony B; Damschroder, Laura J

    2018-06-01

    PurposeImplementation research provides a structure for evaluating the clinical integration of genomic medicine interventions. This paper describes the Implementing Genomics in Practice (IGNITE) Network's efforts to promote (i) a broader understanding of genomic medicine implementation research and (ii) the sharing of knowledge generated in the network.MethodsTo facilitate this goal, the IGNITE Network Common Measures Working Group (CMG) members adopted the Consolidated Framework for Implementation Research (CFIR) to guide its approach to identifying constructs and measures relevant to evaluating genomic medicine as a whole, standardizing data collection across projects, and combining data in a centralized resource for cross-network analyses.ResultsCMG identified 10 high-priority CFIR constructs as important for genomic medicine. Of those, eight did not have standardized measurement instruments. Therefore, we developed four survey tools to address this gap. In addition, we identified seven high-priority constructs related to patients, families, and communities that did not map to CFIR constructs. Both sets of constructs were combined to create a draft genomic medicine implementation model.ConclusionWe developed processes to identify constructs deemed valuable for genomic medicine implementation and codified them in a model. These resources are freely available to facilitate knowledge generation and sharing across the field.

  20. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    PubMed Central

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351

  1. Systematic procedures to determine incentive/disincentive dollar amounts for highway transportation construction projects.

    DOT National Transportation Integrated Search

    2012-06-01

    The Federal Highway Administration has encouraged state transportation agencies to implement Incentive/Disincentive (I/D) contracting provisions for early project completion. Although general guidelines to determine the I/D dollar amount for a projec...

  2. Embankment quality and assessment of moisture control implementation : tech transfer summary.

    DOT National Transportation Integrated Search

    2016-02-01

    The motivation for this project was based on work by : Iowa State University (ISU) researchers at a few recent : grading projects that demonstrated embankments were : being constructed outside moisture control limits, even : though the contractor QC ...

  3. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  4. Key challenges in the development and implementation of telehealth projects.

    PubMed

    Joseph, Victor; West, Robert M; Shickle, Darren; Keen, Justin; Clamp, Susan

    2011-01-01

    A literature review was carried out to identify the key challenges in the implementation of telehealth. This was followed by a survey of organisations in England involved in telehealth projects in order to understand the challenges they faced. Ten of the 13 health or local authority organisations surveyed had telehealth projects and three were at the planning stage. The analysis revealed seven key challenges facing implementers of telehealth in England. Based on the findings from the literature review and the survey, a model was constructed and a checklist drawn up. The model contained the following elements: identifying issues, needs and partners; producing a strategy; securing funding; implementing changes; and monitoring and evaluating a telehealth project. The checklist was validated by using key informants from the organisations originally surveyed. The checklist may be useful to guide telehealth development and implementation in the future.

  5. Supplement Analysis for the Watershed Management Program Final EIS (DOE EIS /SA-156) - Upper Salmon River Anadromous Fish Passage Improvement Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Keller, Carl J.

    2004-07-13

    BPA proposes to fund IDFG to plan and complete construction of fish passage improvements and water conservation activities that are contained within IDFG’s Statement of Work (SOW) for the period 7/1/04 to 6/30/05. The funding request contained in their SOW is part of an ongoing IDFG effort to fund anadromous fish passage projects that fall outside the scope of the Mitchell Act. The proposed SOW activities fall within the following four categories: Phase I-Planning and Design (gather data, perform investigations, and exchange information; perform surveys and assessments to be compliant; survey project sites and perform engineering designs; perform contract andmore » project management); Phase II-Construction and Implementation (procure materials and supplies, prepare contracts and solicit bids, plant native seedlings, complete capital improvements); Phase III-Operation and Maintenance (maintain office operations); and Phase IV- Monitoring and Evaluation (monitor and evaluate post-project effects, reporting). The SOW culminates with proposed construction of 18 capital improvement projects (Table 1 attached). The types of capital improvements include: screening gravity water diversions; consolidating and/or eliminating ditches; evaluating and screening pump diversions; evaluating and implementing water conservation activities; constructing screens along migration routes and rearing areas for hatchery and wild salmon; improving upstream and downstream passage for anadromous fish; and maximize benefits to aquatic habitat. Because each of the proposed projects in the SOW is still in the planning stages, the specifics of each still need to be completed.« less

  6. Formation of the portfolio of high-rise construction projects on the basis of optimization of «risk-return» rate

    NASA Astrophysics Data System (ADS)

    Uvarova, Svetlana; Kutsygina, Olga; Smorodina, Elena; Gumba, Khuta

    2018-03-01

    The effectiveness and sustainability of an enterprise are based on the effectiveness and sustainability of its portfolio of projects. When creating a production program for a construction company based on a portfolio of projects and related to the planning and implementation of initiated organizational and economic changes, the problem of finding the optimal "risk-return" ratio of the program (portfolio of projects) is solved. The article proposes and approves the methodology of forming a portfolio of enterprise projects on the basis of the correspondence principle. Optimization of the portfolio of projects on the criterion of "risk-return" also contributes to the company's sustainability.

  7. Evaluating the constructability of NUDECK precast concrete deck panels for Kearney Bypass Project.

    DOT National Transportation Integrated Search

    2015-02-01

    The first generation of precast concrete deck system, NUDECK, was implemented on the Skyline Bridge, : Omaha, NE in 2004. The second generation of NUDECK system was developed to further simplify the : system and improve its constructability and durab...

  8. Implementation of straight and curved steel girder erection design tools construction : summary.

    DOT National Transportation Integrated Search

    2010-11-05

    Project 0-5574 Curved Plate Girder Design for Safe and Economical Construction, resulted in the : development of two design tools, UT Lift and UT Bridge. UT Lift is a spreadsheet-based program for analyzing : steel girders during lifting while ...

  9. Geopolitical model of investment power station construction project implementation

    NASA Astrophysics Data System (ADS)

    Malafeyev, Oleg; Farvazov, Konstantin; Zenovich, Olga; Zaitseva, Irina; Kostyukov, Konstantin; Svechinskaya, Tatiana

    2018-04-01

    Two geopolitical actors implement a geopolitical project that involves transportaion and storage of some commodities. They interact with each other through a transport network. The network consists of several interconnected vertices. Some of the vetrices are trading hubs, storage spaces, production hubs and goods buyers. Actors wish to satify the demand of buyers and recieve the highest possible profit subject to compromise solution principle. A numerical example is given.

  10. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2003 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  11. John Day Watershed Restoration Projects, annual report 2003.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, Linda

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), which contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2003, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, juniper control, permanent diversions, pump stations, and return-flow cooling systems. Due to funding issues and delays, permitting delays, fire closures and landowner contracting problems, 2 projects were canceled and 7 projects were rescheduled to the 2004 construction season. Project costs in 2003 totaled $115,554.00 with a total amount of $64,981.00 (56%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  12. Investigation of the Use of Match Cure Technology in the Precast Concrete Industry

    DOT National Transportation Integrated Search

    1998-08-01

    This project was proposed to evaluate the feasibility and methodology of implementing match cure technology and maturity measurement systems into TxDOT acceptance criteria for concrete construction projects. This report will deal strictly with the in...

  13. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  14. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  15. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  16. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  17. 23 CFR 924.11 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., where applicable, for highway construction projects, 23 CFR part 172 for engineering and design services..., pavement markings, or installation of traffic signs, traffic lights, guardrails, impact attenuators... may amount up to 100 percent for projects for signing, pavement markings, active warning devices, and...

  18. Anthropometric protocols for the construction of new international fetal and newborn growth standards: the INTERGROWTH-21st Project.

    PubMed

    Cheikh Ismail, L; Knight, H E; Bhutta, Z; Chumlea, W C

    2013-09-01

    The primary aim of the INTERGROWTH-21(st) Project is to construct new, prescriptive standards describing optimal fetal and preterm postnatal growth. The anthropometric measurements include the head circumference, recumbent length and weight of the infants, and the stature and weight of the parents. In such a large, international, multicentre project, it is critical that all study sites follow standardised protocols to ensure maximal validity of the growth and nutrition indicators used. This paper describes, in detail, the selection of anthropometric personnel, equipment, and measurement and calibration protocols used to construct the new standards. Implementing these protocols at each study site ensures that the anthropometric data are of the highest quality to construct the international standards. © 2013 Royal College of Obstetricians and Gynaecologists.

  19. Assessing Students' Sentiments towards the Use of a Building Information Modelling (BIM) Learning Platform in a Construction Project Management Course

    ERIC Educational Resources Information Center

    Suwal, Sunil; Singh, Vishal

    2018-01-01

    Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused…

  20. The Impact of Airport Performance towards Construction and Infrastructure Expansion in Indonesia

    NASA Astrophysics Data System (ADS)

    Laksono, T. D.; Kurniasih, N.; Hasyim, C.; Setiawan, M. I.; Ahmar, A. S.

    2018-01-01

    Development that is generated from airport areas includes construction and infrastructure development. This research reviews about how the implementation of material management in certain construction project and the relationship between development especially construction and infrastructure development with Airport Performance. The method that is used in this research is mixed method. The population in this research is 297 airports that are existed in Indonesia. From those 297 airports then it is chosen airports that have the most completed data about construction project and it is obtained 148 airports. Based on the coefficient correlation (R) test it is known that construction and infrastructure development has relatively strong relation with airport performance variable, but there are still other factors that influence construction and infrastructure development become bigger effect.

  1. 78 FR 56729 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ..., maintenance, and decommissioning of the Beech Ridge Wind Power Project. Beech Ridge Energy is requesting a 25... of 67 existing turbines in the project area; the construction, operation, and maintenance of up to 33... Wind Power Project, Greenbrier and Nicholas Counties, West Virginia AGENCY: Fish and Wildlife Service...

  2. An empirical survey of the benefits of implementing pay for safety scheme (PFSS) in the Hong Kong construction industry.

    PubMed

    Chan, Daniel W M; Chan, Albert P C; Choi, Tracy N Y

    2010-10-01

    The Government of the Hong Kong Special Administrative Region (SAR) has implemented different safety initiatives to improve the safety performance of the construction industry over the past decades. The Pay for Safety Scheme (PFSS), which is one of the effective safety measures launched by the government in 1996, has been widely adopted in the public works contracts. Both the accident rate and fatality rate of public sector projects have decreased noticeably over this period. This paper aims to review the current state of application of PFSS in Hong Kong, and attempts to identify and analyze the perceived benefits of PFSS in construction via an industry-wide empirical questionnaire survey. A total of 145 project participants who have gained abundant hands-on experience with the PFSS construction projects were requested to complete a survey questionnaire to indicate the relative importance of those benefits identified in relation to PFSS. The perceived benefits were measured and ranked from the perspectives of the client and contractor for crosscomparison. The survey findings suggested the most significant benefits derived from adopting PFSS were: (a) Increased safety training; (b) Enhanced safety awareness; (c) Encouragement of developing safety management system; and (d) Improved safety commitment. A wider application of PFSS should be advocated so as to achieve better safety performance within the construction industry. It is recommended that a similar scheme to the PFSS currently adopted in Hong Kong may be developed for implementation in other regions or countries for international comparisons. Copyright © 2010 Elsevier Ltd and National Safety Council. All rights reserved.

  3. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    NASA Astrophysics Data System (ADS)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  4. Implementation of the 64-meter-diameter Antennas at the Deep Space Stations in Australia and Spain

    NASA Technical Reports Server (NTRS)

    Bartos, K. P.; Bell, H. B.; Phillips, H. P.; Sweetser, B. M.; Rotach, O. A.

    1975-01-01

    The management and construction aspects of the Overseas 64-m Antenna Project in which two 64-m antennas were constructed at the Tidbinbilla Deep Space Communications Complex in Australia, and at the Madrid Deep Space Communications Complex in Spain are described. With the completion of these antennas the Deep Space Network is equipped with three 64-m antennas spaced around the world to maintain continuous coverage of spacecraft operations. These antennas provide approximately a 7-db gain over the capabilities of the existing 26-m antenna nets. The report outlines the project organization and management, resource utilization, fabrication, quality assurance, and construction methods by which the project was successfully completed. Major problems and their solutions are described as well as recommendations for future projects.

  5. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  6. 75 FR 52701 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... information claimed to be Confidential Business Information (CBI) or other information whose disclosure is.... Ventilation Limits 5. Ongoing Ventilation Testing and Reporting Requirements 6. Winter Construction Work..., including building enclosure and ventilation projects, implementation of work practice standards, process...

  7. Effects of organizational context on Lean implementation in five hospital systems.

    PubMed

    Harrison, Michael I; Paez, Kathryn; Carman, Kristin L; Stephens, Jennifer; Smeeding, Lauren; Devers, Kelly J; Garfinkel, Steven

    2016-01-01

    Despite broad agreement among researchers about the value of examining how context shapes implementation of improvement programs and projects, limited attention has been paid to contextual effects on implementation of Lean. To help reduce gaps in knowledge of effects of intraorganizational context, we researched Lean implementation initiatives in five organizations and examined 12 of their Lean rapid improvement projects. All projects aimed at improving clinical care delivery. On the basis of the literature on Lean, innovation, and quality improvement, we developed a framework of factors likely to affect Lean implementation and outcomes. Drawing on the framework, we conducted semistructured interviews and applied qualitative codes to the transcribed interviews. Available documents, data, and observations supplemented the interviews. We constructed case studies of Lean implementation in each organization, compared implementation across organizations, and compared the 12 projects. Intraorganizational characteristics affecting organization-wide Lean initiatives and often also shaping project outcomes included CEO commitment to Lean and active support for it, prior organizational capacity for quality improvement-based performance improvement, alignment of the Lean initiative with the organizational mission, dedication of resources and experts to Lean, staff training before and during projects, establishment of measurable and relevant project targets, planning of project sequences that enhance staff capabilities and commitment without overburdening them, and ensuring communication between project members and other affected staff. Dependence of projects on inputs of new information technology was a barrier to project success. Incremental implementation of Lean produced reported improvements in operational efficiency and occasionally in care quality. However, even under the relatively favorable circumstances prevailing in our study sites, incremental implementation did not readily change organizational culture. This study should alert researchers, managers, and teachers of management to ways that contexts shape Lean implementation and may affect other types of process redesign and quality improvement.

  8. Study on Resources Assessment of Coal Seams covered by Long-Distance Oil & Gas Pipelines

    NASA Astrophysics Data System (ADS)

    Han, Bing; Fu, Qiang; Pan, Wei; Hou, Hanfang

    2018-01-01

    The assessment of mineral resources covered by construction projects plays an important role in reducing the overlaying of important mineral resources and ensuring the smooth implementation of construction projects. To take a planned long-distance gas pipeline as an example, the assessment method and principles for coal resources covered by linear projects are introduced. The areas covered by multiple coal seams are determined according to the linear projection method, and the resources covered by pipelines directly and indirectly are estimated by using area segmentation method on the basis of original blocks. The research results can provide references for route optimization of projects and compensation for mining right..

  9. Challenges in Construction Over Soft Soil - Case Studies in Malaysia

    NASA Astrophysics Data System (ADS)

    Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.

    2016-07-01

    Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

  10. Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.

    This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less

  11. Environmental assessment for the A-01 outfall constructed wetlands project at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-01

    The Department of Energy (DOE) prepared this environmental assessment (EA) to analyze the potential environmental impacts associated with the proposed A-01 outfall constructed wetlands project at the Savannah River site (SRS), located near aiken, South Carolina. The proposed action would include the construction and operation of an artificial wetland to treat effluent from the A-01 outfall located in A Area at SRS. The proposed action would reduce the outfall effluent concentrations in order to meet future outfall limits before these go into effect on October 1, 1999. This document was prepared in compliance with the National Environmental Policy Act (NEPA)more » of 1969, as amended; the requirements of the Council on Environmental Quality Regulations for Implementing NEPA (40 CFR Parts 1500--1508); and the DOE Regulations for Implementing NEPA (10 CFR Part 1021).« less

  12. Develop a PWL System for Dense Graded Hot Mix Asphalt Construction, Including Pay Factors

    DOT National Transportation Integrated Search

    2015-01-01

    This research project developed a PWL system that the Nevada DOT can effectively implement on the construction of dense graded HMA mixtures. The PWL system includes pay factors that are based on pavement performance indicators such as rutting and cra...

  13. Construction of reduced order models for the non-linear Navier-Stokes equations using the proper orthogonal fecomposition (POD)/Galerkin method.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fike, Jeffrey A.

    2013-08-01

    The construction of stable reduced order models using Galerkin projection for the Euler or Navier-Stokes equations requires a suitable choice for the inner product. The standard L2 inner product is expected to produce unstable ROMs. For the non-linear Navier-Stokes equations this means the use of an energy inner product. In this report, Galerkin projection for the non-linear Navier-Stokes equations using the L2 inner product is implemented as a first step toward constructing stable ROMs for this set of physics.

  14. Predicting on-site environmental impacts of municipal engineering works

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gangolells, Marta, E-mail: marta.gangolells@upc.edu; Casals, Miquel, E-mail: miquel.casals@upc.edu; Forcada, Núria, E-mail: nuria.forcada@upc.edu

    2014-01-15

    The research findings fill a gap in the body of knowledge by presenting an effective way to evaluate the significance of on-site environmental impacts of municipal engineering works prior to the construction stage. First, 42 on-site environmental impacts of municipal engineering works were identified by means of a process-oriented approach. Then, 46 indicators and their corresponding significance limits were determined on the basis of a statistical analysis of 25 new-build and remodelling municipal engineering projects. In order to ensure the objectivity of the assessment process, direct and indirect indicators were always based on quantitative data from the municipal engineering projectmore » documents. Finally, two case studies were analysed and found to illustrate the practical use of the proposed model. The model highlights the significant environmental impacts of a particular municipal engineering project prior to the construction stage. Consequently, preventive actions can be planned and implemented during on-site activities. The results of the model also allow a comparison of proposed municipal engineering projects and alternatives with respect to the overall on-site environmental impact and the absolute importance of a particular environmental aspect. These findings are useful within the framework of the environmental impact assessment process, as they help to improve the identification and evaluation of on-site environmental aspects of municipal engineering works. The findings may also be of use to construction companies that are willing to implement an environmental management system or simply wish to improve on-site environmental performance in municipal engineering projects. -- Highlights: • We present a model to predict the environmental impacts of municipal engineering works. • It highlights significant on-site environmental impacts prior to the construction stage. • Findings are useful within the environmental impact assessment process. • They also help contractors to implement environmental management systems.« less

  15. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  16. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  17. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  18. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  19. 33 CFR 203.41 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...

  20. Lack of data for predicting storm water pollutant removal by post-construction best management practices.

    DOT National Transportation Integrated Search

    2016-03-01

    The project objective was to conduct a detailed literature review of storm water pollutants and mitigation technologies and synthesize : the information so that INDOT can implement project results into standards. Because it is a municipal separate st...

  1. The Laborers-AGC Construction Skills Training Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Tippie, John L.; Rice, Eric

    Patterned after a previously successful Laborers-Associated General Contractors model named the Construction Skills Training Program, a demonstration project was implemented at five regional training centers. At least eight courses were created, combined, or revised. Four full-length audiovisual support pieces were completed. Three courses were…

  2. 78 FR 25973 - Final Environmental Impact Statement for the Real Property Master Plan at the Presidio of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... implementing both short-range and long-range projects. Proposed facility improvements and phased construction... Institute Foreign Language Center (DLIFLC). Facilities, construction, improvements, renovations... have modern facilities consistent with Army standards well into the 21st Century. The overall goal is...

  3. Articulated, Performance-Based Instruction Objectives Guide for Building Construction/Carpentry. Final Document. Revised.

    ERIC Educational Resources Information Center

    Henderson, William Edward, Jr.

    Developed during a project designed to provide continuous, performance-based vocational training at the secondary and postsecondary levels, this instructional guide is intended to help teachers implement a laterally and vertically articulated secondary level building construction/carpentry program. Introductory materials include descriptions of…

  4. 75 FR 78208 - Black Hills National Forest, Northern Hills Ranger District; South Dakota; Steamboat Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ... burning. Approximately 18 miles of new road construction would be necessary to carry out the proposed... may be used. Road construction and maintenance activities would be necessary to access areas proposed for timber harvest. New roads would be closed following management activities. Implementation of...

  5. The Attitude of Construction Workers toward the Implementation of Occupational Health and Safety (OHS)

    NASA Astrophysics Data System (ADS)

    Widaningsih, L.; Susanti, I.; Chandra, T.

    2018-02-01

    Construction industry refers to one of the industries dealing with high accident rate. Besides its outdoor workplace involving many workers who usually work manually, the workers’ work culture and less awareness of occupational health and safety (OHS) are attributed to the high accident rate. This study explores some construction workers who are involved in some construction projects in big cities such as Bandung and Jakarta. The questionnaire-given to the construction workers focusing on stone construction, wood construction, and finishing session-reveals that the construction workers knowledge and understanding of nine Occupational Health and Safety (OHS) aspects reach above 50%. However, does not appear to reflect their knowledge and understanding of Occupational Health and Safety (OHS). The results of Focus Group Discussion (FGD) and an in-depth interview show that the fallacious implementation of Occupational Health and Safety (OHS) is attributed to their traditional “work culture”.

  6. Student Information Systems: A Guide to Implementation Success

    ERIC Educational Resources Information Center

    Cramer, Sharon F.

    2005-01-01

    What will expedite the implementation of a student information system? This document contains constructive examples and practical suggestions, giving readers a step-by-step approach to improving campus buy-in, communication, collaboration and funding; as well as leading project team members and campus administrators through the critically…

  7. Helix Project Testbed - Towards the Self-Regenerative Incorruptible Enterprise

    DTIC Science & Technology

    2011-09-14

    hardware implementation with a microkernel in a way that allows information flow properties of the entire construction to be statically verified all the way...secure architectural skeleton. This skeleton couples a critical slice of the low level hardware implementation with a microkernel in a way that

  8. 44 CFR 209.10 - Project implementation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...

  9. 44 CFR 209.10 - Project implementation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...

  10. 44 CFR 209.10 - Project implementation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...

  11. 44 CFR 209.10 - Project implementation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...

  12. 44 CFR 209.10 - Project implementation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... to match elevation or acquisition and relocation projects. Increased Cost of Compliance claims can... new structure(s) will be built on the property except as indicated in this paragraph: (A) A public... of FEMA approves in writing before the construction of the structure begins. (D) In general...

  13. Formation of production structural units within a construction company using the systemic integrated method when implementing high-rise development projects

    NASA Astrophysics Data System (ADS)

    Lapidus, Azary; Abramov, Ivan

    2018-03-01

    Development of efficient algorithms for designing future operations is a vital element in construction business. This paper studies various aspects of a methodology required to determine the integration index for construction crews performing various process-related jobs. The main objective of the study outlined in this paper is to define the notion of integration in respect to a construction crew that performs complete cycles of construction and assembly works in order to find the optimal organizational solutions, using the integrated crew algorithm built specifically for that purpose. As seen in the sequence of algorithm elements, it was designed to focus on the key factors affecting the level of integration of a construction crew depending on the value of each of those elements. The multifactor modelling approach is used to assess the KPI of integrated construction crews involved in large-sale high-rise construction projects. The purpose of this study is to develop a theoretical recommendation and a scientific methodological provision of organizational and technological nature to ensure qualitative formation of integrated construction crews to increase their productivity during integrated implementation of multi-task construction phases. The key difference of the proposed solution from the already existing ones is that it requires identification of the degree of impact of each factor, including the change in the qualification level, on the integration index of each separate element in the organizational and technological system in construction (integrated construction crew).

  14. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office: FY 1999 Watershed Restoration Projects : Annual Report 1999.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, Shawn W.

    2001-03-01

    The John Day River is the second longest free-flowing river in the contiguous United States and one of the few major subbasins in the Columbia River basin containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, the fourth largest drainage area in Oregon. With its beginning in the Strawberry Mountains near the town of Prairie City, the John Day flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring chinook salmon and summer steelhead, red band,more » westslope cutthroat, and redband trout, the John Day system is truly one of national significance. The entire John Day basin was granted to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) initiated contracting the majority of its construction implementation actions with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of the projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 1999, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional eleven (11) watershed conservation projects. The types of projects implemented included installation of infiltration galleries, permanent diversions, pumping stations, and irrigation efficiency upgrades. Project costs in 1999 totaled $284,514.00 with a total amount of $141,628.00 (50%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Confederated Tribes of Warm Springs, Oregon Watershed Enhancement Board, and individual landowners.« less

  15. Mechanisation and automation technologies development in work at construction sites

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  16. Tailoring a software production environment for a large project

    NASA Technical Reports Server (NTRS)

    Levine, D. R.

    1984-01-01

    A software production environment was constructed to meet the specific goals of a particular large programming project. These goals, the specific solutions as implemented, and the experiences on a project of over 100,000 lines of source code are discussed. The base development environment for this project was an ordinary PWB Unix (tm) system. Several important aspects of the development process required support not available in the existing tool set.

  17. Effective Risk Management in Innovative Projects: A Case Study of the Construction of Energy-efficient, Sustainable Building of the Laboratory of Intelligent Building in Cracow

    NASA Astrophysics Data System (ADS)

    Krechowicz, Maria

    2017-10-01

    Many construction projects fail to meet deadlines or they exceed the assumed budget. This scenario is particularly common in the case of innovative projects, in which too late identification of a high risk of delays and exceeding the assumed costs makes a potentially profitable project untenable. A high risk level, far exceeding the level of risk in standard non-innovative projects, is a characteristic feature of the realization phase of innovative projects. This is associated not only with greater complexity of the design and construction phases, but also with the problems with application of new technologies and prototype solutions, lack of qualified personnel with suitable expertise in specialized areas, and with the ability to properly identify the gaps between available and required knowledge and skills. This paper discusses the process of effective risk management in innovative projects on the example of the realization phase of an innovative, energy-efficient and sustainable building of the Laboratory of Intelligent Building in Cracow - DLJM Lab, from the point of view of DORBUD S.A., its general contractor. In this paper, a new approach to risk management process for innovative construction projects is proposed. Risk management process was divided into five stages: gathering information, identification of the important unwanted events, first risk assessment, development and choice of risk reaction strategies, assessment of the residual risk after introducing risk reactions. 18 unwanted events in an innovative construction project were identified. The first risk assessment was carried out using two-parametric risk matrix, in which the probability of unwanted event occurrence and its consequences were analysed. Three levels of risks were defined: tolerable, controlled and uncontrolled. Risk reactions to each defined unwanted event were developed. The following risk reaction types were considered: risk retention, risk reduction, risk transfer and risk elimination. Three-parametric risk matrix was developed to make it possible to assess risk after implementing risk reactions. The possibility of implementing risk management was inversely proportional to the probability of unwanted event occurrence and its contribution to the project outcome. Introducing this risk management strategy allowed to significantly reduce the risk of the innovative construction project. It proved to be an effective tool to reduce risk to an acceptable level. It had a significant contribution to carrying out the project within the assumed time, budget and quality standards.

  18. Sewing for a Cause: Implementing and Evaluating Service-Learning in a Clothing Construction Course

    ERIC Educational Resources Information Center

    Freeman, Charles; Kobia, Caroline

    2016-01-01

    The purpose of this exploratory investigation is to examine the use of a pedagogical framework to guide the development of a successful service-learning project within a technical program (clothing construction) as determined by increased student engagement and qualitative feedback. This investigation uses student reflection comparisons to assess…

  19. Competency-Based Preservice Construction Trades Curriculum, Phase II. Final Report.

    ERIC Educational Resources Information Center

    Nelms, Howard F.

    A two-phase curriculum project was undertaken in Illinois to develop, test, and implement a two-year competency-based model for the education of secondary school building construction teachers in the area of residential structures. During the first contract period, skill and knowledge competencies were identified and validated for thirteen units…

  20. Students' construction of a simple steam distillation apparatus and development of creative thinking skills: A project-based learning

    NASA Astrophysics Data System (ADS)

    Diawati, Chansyanah; Liliasari, Setiabudi, Agus; Buchari

    2017-05-01

    This project-based learning combined the chemistry of separation process using steam distillation with engineering design process in an undergraduate chemistry course. Students built upon their knowledge of phase changes, immiscible mixture, and the relationship between vapor pressure and boiling point to complete a project of modifications steam distillation apparatus. The research method is a qualitative case study, which aims to describe how (1) the creative thinking skills of students emerged during six weeks of theproject, (2) students built steam distillation apparatus characteristics as the project product and (3) students response to the project-based learning model. The results showed that the students had successfully constructed a steam distillation apparatus using plastic kettle as steam generator and distillation flask. A Plastic tubewas used to drain water vapor from steam generator to distillation flask and to drain steam containing essential oil to the condenser. A biscuit tin filled with ice was used as a condenser. The time required until resulting distillate was fifteen minutes. The production of essential was conductive qualitatively by a very strong smell typical of essential oil and two phases of distillate. Throughout the project, students formulated the relevant and varied problem, formulated the goals, proposed the ideas of the apparatus and materials, draw apparatus design, constructed apparatus, tested apparatus, evaluated, and reported the project. Student response was generally positive. They were pleased, interested, more understanding the concepts and work apparatus principles, also implemented new ideas. These results indicate that project-based learning can develop students' creative thinking skills. Based on these results, it is necessary to conduct research and implemented project-based learning to other concepts.

  1. A STUDY ON IMPLEMENTATION OF PROCUREMENT MANAGEMENT METHOD THAT DELIVERLY'S UNCERTAINTY OF EQUIPMENTS, MATERIALS AND INSTRUCTIONS

    NASA Astrophysics Data System (ADS)

    Asaine, Keita; Asaine, Wataru; Shiratsuchi, Ryoma; Yoshida, Takaichi; Hashimoto, Masaaki

    This paper highlights the issues of procurement management in construction projects, such as late delivery of purchased equipments/materials and missing instructions from customers, which cause delays of construction schedule and over-budget cost. We point that most of these problems are caused by lack of synchronization between procurement activities and process control. Therefore, we propose a managerial method which enables better synchronization between the two by applying this method to a construction company. We discuss the necessary conditions and validity of incorporating it and show the way how to establish the mechanics through the case study. Furthermore, we analyze that the feature of this method is not only addressing procurement issues but also bringing additional benefits, such as shortening project lead time and reducing project cost.

  2. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2001.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day River is the nation's second longest free-flowing river in the contiguous United States, which is entirely unsupplemented for it's runs of anadromous fish. Located in eastern Oregon, the John Day Basin drains over 8,000 square miles, is Oregon's fourth largest drainage basin, and the basin incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the mainstem John Day River flows 284 miles in a northwesterly direction entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon, summer steelhead, westslope cutthroat, and redband andmore » bull trout, the John Day system is truly a basin with national significance. The Majority of the John Day Basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in John Day to coordinate basin restoration projects, monitoring, planning, and other watershed restoration activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in John Day, who subcontracts the majority of the construction implementation activities for these restoration projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2001, the JDBO and GSWCD continued their successful partnership between the two agencies and basin landowners to implement an additional ten (10) watershed conservation projects. The project types include permanent lay flat diversions, pump stations, and return-flow cooling systems. Project costs in 2001 totaled $572,766.00 with $361,966.00 (67%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources, such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board (OWEB), and individual landowners.« less

  3. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : 2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    The John Day is the nation's second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles, Oregon's fourth largest drainage basin, and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, westslope cutthroat, and redband and bull trout, the John Day systemmore » is truly a basin with national significance. The majority of the John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Once established, the John Day Basin Office (JDBO) formed a partnership with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day, who contracts the majority of the construction implementation activities for these projects from the JDBO. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/defense, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2002, the JDBO and GSWCD proposed continuation of their successful partnership between the two agencies and basin landowners to implement an additional twelve (12) watershed conservation projects. The types of projects include off channel water developments, riparian fencing, juniper control, permanent diversions, pump stations, infiltration galleries and return-flow cooling systems. Project costs in 2002 totaled $423,198.00 with a total amount of $345,752.00 (81%) provided by the Bonneville Power Administration (BPA) and the remainder coming from other sources such as the Bureau of Reclamation (BOR), Oregon Watershed Enhancement Board, the U.S. Fish & Wildlife Service Partners in Wildlife Program and individual landowners.« less

  4. Federal Agencies' Implementation of the 1983 Emergency Jobs Appropriations Act.

    ERIC Educational Resources Information Center

    Comptroller General of the U.S., Washington, DC.

    A formal review was conducted to assess the efforts made by federal agencies to implement the 1983 Emergency Jobs Appropriations Act (EJAA). (The EJAA provided emergency supplemental appropriations to provide productive employment for jobless Americans, to hasten or initiate federal projects and construction of lasting value to the nation, and to…

  5. School-to-Work Opportunities Local Partnership Implementation Grant, 1994-96. Final Report. Evaluation Report.

    ERIC Educational Resources Information Center

    Claus, Richard N.; And Others

    The 5-year School-to-Work (STW) Opportunities project of the School District of Saginaw, Michigan, was implemented through the Manufacturing, Engineering, Construction, and Automotive (MECA) partnership. Housed at the district's Saginaw Career Complex, it included collaboration among Career Complex staff and local business representatives in the…

  6. Environmental Assessment Lakeview Geothermal Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Treis, Tania

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternativesmore » considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.« less

  7. Develop Strong and Serviceable Details for Precast, Prestressed Concrete Bent Cap Standards That Can Be Implemented on Everyday Bridge Construction Projects, Project Summary

    DOT National Transportation Integrated Search

    2018-01-01

    Pretensioned bent caps are an attractive substructure component because they offer contractors an option for fabrication by prestressing plants and can be used to eliminate or reduce cracks. Two sets of design recommendations were developed to enable...

  8. The Castle Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tom Anderson; David Culler; James Demmel

    2000-02-16

    The goal of the Castle project was to provide a parallel programming environment that enables the construction of high performance applications that run portably across many platforms. The authors approach was to design and implement a multilayered architecture, with higher levels building on lower ones to ensure portability, but with care taken not to introduce abstractions that sacrifice performance.

  9. Children's Stories and Play: Storyride--A Children's Culture Project.

    ERIC Educational Resources Information Center

    Brostrom, Stig

    In modern societies, children are becoming more and more users of a child culture constructed by adults, rather than producers of their own culture. This paper describes a project, implemented in Nordic child care centers and early childhood classes, that provides children the opportunity to narrate and illustrate their own stories, written down…

  10. Evolution of high-rise construction in Leningrad - Saint Petersburg in the middle of the 20th - Early 21st centuries: projects and Implementation

    NASA Astrophysics Data System (ADS)

    Vaytens, Andrey; Rusanov, Gennadiy; Skryabin, Pavel

    2018-03-01

    One of the most important issues in national urban planning is arrangement of high-rise buildings in the largest cities of Russia. This issue becomes especially acute in such cities as Saint Petersburg, which has unique architectural and urban-planning heritage preserved to a great extent. In this regard, it seems important to trace the evolution of high-rise construction development and arrangement in Leningrad - Saint Petersburg in the middle of the 20th — early 21st centuries. The goal of the article is to consider high-rise construction development regarding both public and residential buildings in comparison of project ideas and results of their implementation in the 1940s-2000s. Prerequisites and issues of high-rise construction of that period are considered. Particular attention is paid to changes in the official urban-planning policy, regulatory framework and attitude of city authorities to high-rise construction. The study was carried out with the consideration of the following historic periods differing in their urban-planning policy: the late 1940s-1950s; 1960s; 1970-1980s; 1990s; 2000s-2010s. Economical prerequisites of high-rise construction and their influence on the modern urban-planning policy during the post-Soviet period are considered. In conclusion, an attempt is made to determine tendencies of high-rise construction development in Saint Petersburg.

  11. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  12. Low-Cost In-Fill Installation for High-Energy-Saving, Dynamic Windows

    DTIC Science & Technology

    2017-07-01

    greenhouse gas, HVAC, low emissivity, military construction, photovoltaic, physical vapor deposition, solar heat gain coefficient... Physical vapor deposition ROICC Resident Officer In Charge of Construction SHGC Solar heat gain coefficient S/RM Sustainment, Restoration, and...PERMITS AND REGULATIONS Regulations - The demonstration project planning and implementation followed US Army Corps of Engineers Safety and Health

  13. A Role for Historical Experiments: Capturing the Spirit of the Itinerant Lecturers of the 18th Century

    ERIC Educational Resources Information Center

    Metz, Don; Stinner, Art

    2007-01-01

    Gerald Rutherford (1964), one of the original authors of the Harvard Project Physics course which emphasized the history of science, expressed a view of inquiry which advocated the historical re-constructions of significant experiments. To implement this view we examine two modes of historical re-constructions; Heering's ("Paper…

  14. Inflectional Dependencies: A Study of Complex Verbal Expressions in Ndebele

    ERIC Educational Resources Information Center

    Pietraszko, Joanna

    2017-01-01

    This thesis is a study of the syntax of multi-verb constructions, in which a single clause contains more than one verbal element. Multi-verb constructions are of special interest in light of the hypothesis that clausal structure is headed by a verb. Implemented in terms of extended projections, this hypothesis states that clausal functional…

  15. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  16. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  17. The Society for Implementation Research Collaboration Instrument Review Project: a methodology to promote rigorous evaluation.

    PubMed

    Lewis, Cara C; Stanick, Cameo F; Martinez, Ruben G; Weiner, Bryan J; Kim, Mimi; Barwick, Melanie; Comtois, Katherine A

    2015-01-08

    Identification of psychometrically strong instruments for the field of implementation science is a high priority underscored in a recent National Institutes of Health working meeting (October 2013). Existing instrument reviews are limited in scope, methods, and findings. The Society for Implementation Research Collaboration Instrument Review Project's objectives address these limitations by identifying and applying a unique methodology to conduct a systematic and comprehensive review of quantitative instruments assessing constructs delineated in two of the field's most widely used frameworks, adopt a systematic search process (using standard search strings), and engage an international team of experts to assess the full range of psychometric criteria (reliability, construct and criterion validity). Although this work focuses on implementation of psychosocial interventions in mental health and health-care settings, the methodology and results will likely be useful across a broad spectrum of settings. This effort has culminated in a centralized online open-access repository of instruments depicting graphical head-to-head comparisons of their psychometric properties. This article describes the methodology and preliminary outcomes. The seven stages of the review, synthesis, and evaluation methodology include (1) setting the scope for the review, (2) identifying frameworks to organize and complete the review, (3) generating a search protocol for the literature review of constructs, (4) literature review of specific instruments, (5) development of an evidence-based assessment rating criteria, (6) data extraction and rating instrument quality by a task force of implementation experts to inform knowledge synthesis, and (7) the creation of a website repository. To date, this multi-faceted and collaborative search and synthesis methodology has identified over 420 instruments related to 34 constructs (total 48 including subconstructs) that are relevant to implementation science. Despite numerous constructs having greater than 20 available instruments, which implies saturation, preliminary results suggest that few instruments stem from gold standard development procedures. We anticipate identifying few high-quality, psychometrically sound instruments once our evidence-based assessment rating criteria have been applied. The results of this methodology may enhance the rigor of implementation science evaluations by systematically facilitating access to psychometrically validated instruments and identifying where further instrument development is needed.

  18. Archetype Model-Driven Development Framework for EHR Web System.

    PubMed

    Kobayashi, Shinji; Kimura, Eizen; Ishihara, Ken

    2013-12-01

    This article describes the Web application framework for Electronic Health Records (EHRs) we have developed to reduce construction costs for EHR sytems. The openEHR project has developed clinical model driven architecture for future-proof interoperable EHR systems. This project provides the specifications to standardize clinical domain model implementations, upon which the ISO/CEN 13606 standards are based. The reference implementation has been formally described in Eiffel. Moreover C# and Java implementations have been developed as reference. While scripting languages had been more popular because of their higher efficiency and faster development in recent years, they had not been involved in the openEHR implementations. From 2007, we have used the Ruby language and Ruby on Rails (RoR) as an agile development platform to implement EHR systems, which is in conformity with the openEHR specifications. We implemented almost all of the specifications, the Archetype Definition Language parser, and RoR scaffold generator from archetype. Although some problems have emerged, most of them have been resolved. We have provided an agile EHR Web framework, which can build up Web systems from archetype models using RoR. The feasibility of the archetype model to provide semantic interoperability of EHRs has been demonstrated and we have verified that that it is suitable for the construction of EHR systems.

  19. Analysis of renewable energy projects' implementation in Russia

    NASA Astrophysics Data System (ADS)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  20. One-Step and Two-Step Facility Acquisition for Military Construction: Project Selection and Implementation Procedures

    DTIC Science & Technology

    1990-08-01

    the guidance in this report. 1-4. Scope This guidance covers selection of projects suitable for a One-Step or Two-Step approach, development of design...conducted, focus on resolving proposal deficiencies; prices are not "negotiated" in the common use of the term. A Request for Proposal (RFP) states project ...carefully examines experience and past performance in the design of similar projects and building types. Quality of

  1. Financing the construction of transport infrastructure as the basis for sustainable development of the regional economy

    NASA Astrophysics Data System (ADS)

    Nidziy, Elena

    2017-10-01

    Dependence of the regional economic development from efficiency of financing of the construction of transport infrastructure is analyzed and proved in this article. Effective mechanism for infrastructure projects financing, public and private partnership, is revealed and its concrete forms are formulated. Here is proposed an optimal scenario for financing for the transport infrastructure, which can lead to positive transformations in the economy. Paper considers the advantages and risks of public and private partnership for subjects of contractual relations. At that, components for the assessment of economic effect of the implementation of infrastructure projects were proposed simultaneously with formulation of conditions for minimization risks. Results of the research could be used for solution of persistent problems in the development of transport infrastructure, issues of financial assurance of construction of infrastructure projects at the regional level.

  2. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  3. Learning to Design and Implement Educational Web Sites within Pre-Service Training: a Project-Based Learning Environment and its Impact on Student Teachers

    ERIC Educational Resources Information Center

    Papastergiou, Marina

    2005-01-01

    This paper reports on a project-based learning (PBL) environment targeted towards introducing student teachers to the design and development of educational web sites. The participants were 46 student teachers who constructed 16 web sites for primary school. A survey of their views, before and after the projects, and an evaluation of the web sites…

  4. Learning to Design and Implement Educational Web Sites within Pre-Service Training: A Project-Based Learning Environment and Its Impact on Student Teachers

    ERIC Educational Resources Information Center

    Papastergiou, Marina

    2005-01-01

    This paper reports on a project-based learning (PBL) environment targeted towards introducing student teachers to the design and development of educational web sites. The participants were 46 student teachers who constructed 16 web sites for primary school. A survey of their views, before and after the projects, and an evaluation of the web sites…

  5. A financing model to solve financial barriers for implementing green building projects.

    PubMed

    Lee, Sanghyo; Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained.

  6. A Financing Model to Solve Financial Barriers for Implementing Green Building Projects

    PubMed Central

    Lee, Baekrae; Kim, Juhyung; Kim, Jaejun

    2013-01-01

    Along with the growing interest in greenhouse gas reduction, the effect of greenhouse gas energy reduction from implementing green buildings is gaining attention. The government of the Republic of Korea has set green growth as its paradigm for national development, and there is a growing interest in energy saving for green buildings. However, green buildings may have financial barriers that have high initial construction costs and uncertainties about future project value. Under the circumstances, governmental support to attract private funding is necessary to implement green building projects. The objective of this study is to suggest a financing model for facilitating green building projects with a governmental guarantee based on Certified Emission Reduction (CER). In this model, the government provides a guarantee for the increased costs of a green building project in return for CER. And this study presents the validation of the model as well as feasibility for implementing green building project. In addition, the suggested model assumed governmental guarantees for the increased cost, but private guarantees seem to be feasible as well because of the promising value of the guarantee from CER. To do this, certification of Clean Development Mechanisms (CDMs) for green buildings must be obtained. PMID:24376379

  7. 24 CFR 585.310 - Project-related restrictions applicable to Youthbuild transitional housing for the homeless.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation grant includes the eligible activities of acquisition, architectural and engineering fees, construction, rehabilitation, operating costs or replacement reserves of transitional housing units, and where...

  8. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    PubMed

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  9. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk; Poon, C.S.; Wong, Agnes

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS)more » to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.« less

  10. 40 CFR 49.22 - Federal implementation plan for Tri-Cities landfill, Salt River Pima-Maricopa Indian Community.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Cities landfill, Salt River Pima-Maricopa Indian Community. 49.22 Section 49.22 Protection of Environment... MANAGEMENT Tribal Authority § 49.22 Federal implementation plan for Tri-Cities landfill, Salt River Pima... construction of electricity-generating engines owned and operated by the Salt River Project at the Tri-Cities...

  11. The Confederated Tribes of the Warm Springs Indian Reservation of Oregon John Day Basin Office : Watershed Restoration Projects : Annual Report, 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Confederated Tribes of the Warm Springs Reservation of Oregon. John Day Basin Office.

    2001-03-01

    The John Day is the second longest free-flowing river in the contiguous United States and the longest containing entirely unsupplemented runs of anadromous fish. Located in eastern Oregon, the basin drains over 8,000 square miles--Oregon's third largest drainage basin--and incorporates portions of eleven counties. Originating in the Strawberry Mountains near Prairie City, the John Day River flows 284 miles in a northwesterly direction, entering the Columbia River approximately four miles upstream of the John Day dam. With wild runs of spring Chinook salmon and summer steelhead, red band, westslope cutthroat, and redband trout, the John Day system is truly amore » basin with national significance. Most all of the entire John Day basin was ceded to the Federal government in 1855 by the Confederated Tribes of the Warm Springs Reservation of Oregon (Tribes). In 1997, the Tribes established an office in the Basin to coordinate restoration projects, monitoring, planning and other watershed activities on private and public lands. Using funding from the Bonneville Power Administration, Bureau of Reclamation, and others, the John Day Basin Office (JDBO) subcontracts the majority of its construction implementation activities with the Grant Soil and Water Conservation District (GSWCD), also located in the town of John Day. The GSWCD completes the landowner contact, preliminary planning, engineering design, permitting, construction contracting, and construction implementation phases of most projects. The JDBO completes the planning, grant solicitation/review, environmental compliance, administrative contracting, monitoring, and reporting portion of the program. Most phases of project planning, implementation, and monitoring are coordinated with the private landowners and basin agencies, such as the Oregon Department of Fish and Wildlife and Oregon Water Resources Department. In 2000, the JDBO and GSWCD proposed continuation of a successful partnership between the two agencies and basin landowners to implement an additional six watershed conservation projects funded by the BPA. The types of projects include permanent diversions, pump stations, and return-flow cooling systems. Project costs in 2000 totaled $533,196.00 with a total amount of $354,932.00 (67%) provided by the Bonneville Power Administration and the remainder coming from other sources such as the BOR, Oregon Watershed Enhancement Board, and individual landowners.« less

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  13. GROWING ALTERNATIVE SUSTAINABLE BUILDINGS: BIOCOMPOSITE PRODUCTS FROM NATURAL FIBER, BIODEGRADABLE AND RECYCLABLE POLYMER MATERIALS FOR LOAD-BEARING CONSTRUCTION COMPONENTS

    EPA Science Inventory

    The Phase 2 proposal set out to define a number of limited research objectives to carry the project forward, based on the success of research and design carried out in Phase I through to the development and implementation of the project towards a marketable commodity for th...

  14. Examining Authentic Intellectual Work with a Historical Digital Documentary Inquiry Project in a Mandated State Testing Environment

    ERIC Educational Resources Information Center

    Swan, Kathy; Hofer, Mark; Swan, Gerry

    2011-01-01

    Three criteria for meaningful student learning--construction of knowledge, disciplined inquiry, and value beyond school--are assessed as authentic learning outcomes for an implementation of a digital documentary project in two fifth grade history classrooms where teachers' practices are constrained by a high-stakes testing climate. In all three…

  15. An Overview of Total Quality Management (TQM) practice in Construction Sector

    NASA Astrophysics Data System (ADS)

    Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed

    2018-04-01

    In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.

  16. Review and Prospect of BIM Policy in China

    NASA Astrophysics Data System (ADS)

    Liu, Bingsheng; Wang, Min; Zhang, Yutao; Liu, Rui; Wang, Anmin

    2017-10-01

    In the process of architectural design, construction, operation and maintenance, the problem of inefficiency and inaccuracy in information application and exchange has caused substantial waste of resources and risk in construction industry. Building Information Management provides an opportunity to address the issue. Building information modelling (BIM) has been increasingly applied in design, construction and other information management in China as its important role in reducing engineering changes, improving engineering quality, shortening project duration, saving project cost, enhancing information sharing among the participants many others. As an integration of process and product, its development and implementation need government regulation to enhance its applications effect and standardize its adoption and implementation. Especially, the government guidance affects the application and development of new technology to a great extent in China. However, relevant policy development falls behind the rapid development of its application in practice in China, which has led to many problems in construction practice. In order to develop effective BIM policy for China, this paper conducted a comprehensive review about existing BIM policy in China by analysing its status and problems, comparing it with the corresponding policy in developed countries such as the USA and UK. The expected policy development direction is also discussed and proposed.

  17. Minimizing delays in the Jordanian construction industry by adopting BIM technology

    NASA Astrophysics Data System (ADS)

    Btoush, M.; Harun, A. T.

    2017-11-01

    The Jordanian construction industry plays a significant role and contributes immensely to the gross domestic product (GDP) of the economy. However, the Jordanian public work and housing ministry and most industry players including engineers and contractors have reported that most of the projects experience delays which lead time and cost overruns, and extra efforts. The main causes of delays identified by researchers include poor scheduling and planning, change orders, site conditions, weather, late deliveries, incompetent technical staff. To address these challenges, the implementation of building information modelling (BIM) is paramount. This paper presents BIM as a powerful tool for reducing delays in Jordan construction projects. The paper focuses on two main parts; the first part involves the identification of the major causes of delays, and the second part is to accurately outline the roles and responsibilities of BIM specialist in construction projects. Finally, the paper matches the roles and responsibilities of BIM specialist and the causes of delays, and how the delays are addressed through BIM specialist.

  18. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    NASA Astrophysics Data System (ADS)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  19. Storm Water BMP Tool Implementation Testing

    DOT National Transportation Integrated Search

    2017-12-01

    Under project 2015-ORIL 7, a screening tool was developed to assist Local communities with selecting post-construction storm water best management practices (BMPs) to comply with the Ohio Environmental Protection Agencys (Ohio EPA) statewide Const...

  20. Evaluation of Mexican transportation infrastructure projects.

    DOT National Transportation Integrated Search

    2009-01-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, construct, and implement its transportation network. It documents through twelve case studies the state of the practice in planning, fi...

  1. Implementation of new OGFC specification.

    DOT National Transportation Integrated Search

    2006-05-01

    The objective of this research is to monitor and document the construction and performance of OGFC on actual field projects. Subsequently, Louisianas OGFC specifications and mix design procedures will be modified as necessary based on the monitori...

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  3. Guidelines for Initiating a Research Agenda: Topic Selection and Evidence of Impact.

    PubMed

    Delost, Maria E; Nadder, Teresa S

    2014-01-01

    The focus on scholarly productivity as an outcome measure for performance evaluations of personnel and/or units and benchmarking purposes is increasing in both the academic and clinical settings. This article presents avenues for identifying achievable research projects in both the academic and clinical settings. Factors for consideration when selecting a project include its significance or impact on the profession, feasibility for implementing the project, and ethical issues related to human subjects protection. A review of the literature is essential for identifying gaps in knowledge and for constructing the hypothesis or research question. Decisions concerning IRB submission, budget allocation, and collection of data must also be considered before implementation of the research design.

  4. Data Policy Construction Set - Building Blocks from Childhood Constructions

    NASA Astrophysics Data System (ADS)

    Fleischer, Dirk; Paul-Stueve, Thilo; Jobmann, Alexandra; Farrenkopf, Stefan

    2016-04-01

    A complete construction set of building blocks usually comes with instructions and these instruction include building stages. The products of these building stages usually build from very general parts become highly specialized building parts for very unique features of the whole construction model. This sounds very much like the construction or organization of an interdisciplinary research project, institution or association, doesn't it! The creation process of an overarching data policy for a project group or institution is exactly the combination of individual interests with the common goal of a collaborative data policy and can be compared with the building stages of a construction set of building blocks and the building instructions. Keeping this in mind we created the data policy construction set of textual building blocks. This construction set is subdivided into several building stages or parts each containing multiple building blocks as text blocks. By combining building blocks of all subdivisions it is supposed to create a cascading data policy document. Cascading from the top level as a construction set provider for all further down existing levels such as project, themes, work packages or Universities, faculties, institutes down to the working level of working groups. The working groups are picking from the remaining building blocks in the provided construction set the suitable blocks for its working procedures to create a very specific policy from the available construction set provided by the top level community. Nevertheless, if a working group realized that there are missing building blocks or worse that there are missing building parts, then they have the chance to add the missing pieces to the construction set of direct an future use. This cascading approach enables project or institution wide application of the encoded rules from the textual level on access to data storage infrastructure. This structured approach is flexible enough to allow for the fact that interdisciplinary research projects always bring together very diverse amount of working habits, methods and requirements. All these need to be considered for the creation of the general document on data sharing and research data management. This approach focused on the recommendation of the RDA practical policy working group to implement practical policies derived from the textual level. Therefore it aims to move the data policy creation procedure and implementation towards the consortium or institutional formation with all the benefits of an existing data policy construction set already during the proposal creation and proposal review. Picking up the metaphor of real building blocks in context of data policies provides also the insight that existing building blocks and building parts can be reused as they are, but also can be redesigned with very little changes or a full overhaul.

  5. The design, construction and implementation of a computerised trauma registry in a developing South African metropolitan trauma service.

    PubMed

    Laing, G L; Bruce, J L; Aldous, C; Clarke, D L

    2014-01-01

    The Pietermaritzburg Metropolitan Trauma Service formerly lacked a robust computerised trauma registry. This made surgical audit difficult for the purpose of quality of care improvement and development. We aimed to design, construct and implement a computerised trauma registry within our service. Twelve months following its implementation, we sought to examine and report on the quality of the registry. Formal ethical approval to maintain a computerised trauma registry was obtained prior to undertaking any design and development. Appropriate commercial software was sourced to develop this project. The registry was designed as a flat file. A flat file is a plain text or mixed text and binary file which usually contains one record per line or physical record. Thereafter the registry file was launched onto a secure server. This provided the benefits of access security and automated backups. Registry training was provided to clients by the developer. The exercise of data capture was then integrated into the process of service delivery, taking place at the endpoint of patient care (discharge, transfer or death). Twelve months following its implementation, the compliance rates of data entry were measured. The developer of this project managed to design, construct and implement an electronic trauma registry into the service. Twelve months following its implementation the data were extracted and audited to assess the quality. A total of 2640 patient entries were captured onto the registry. Compliance rates were in the order of eighty percent and client satisfaction rates were high. A number of deficits were identified. These included the omission of weekend discharges and underreporting of deaths. The construction and implementation of the computerised trauma registry was the beginning of an endeavour to continue improvements in the quality of care within our service. The registry provided a reliable audit at twelve months post implementation. Deficits and limitations were identified and new strategies have been planned to overcome these problems and integrate the trauma registry into the process of clinical care. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. A distributed programming environment for Ada

    NASA Technical Reports Server (NTRS)

    Brennan, Peter; Mcdonnell, Tom; Mcfarland, Gregory; Timmins, Lawrence J.; Litke, John D.

    1986-01-01

    Despite considerable commercial exploitation of fault tolerance systems, significant and difficult research problems remain in such areas as fault detection and correction. A research project is described which constructs a distributed computing test bed for loosely coupled computers. The project is constructing a tool kit to support research into distributed control algorithms, including a distributed Ada compiler, distributed debugger, test harnesses, and environment monitors. The Ada compiler is being written in Ada and will implement distributed computing at the subsystem level. The design goal is to provide a variety of control mechanics for distributed programming while retaining total transparency at the code level.

  7. Study of Evaluation OSH Management System Policy Based On Safety Culture Dimensions in Construction Project

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko

    2017-07-01

    Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.

  8. Some Enlightenments of "Beautiful Rural Construction" on Rural Energy Policy in Beijing—Applying Informatization Means

    NASA Astrophysics Data System (ADS)

    Zhi, Wang; Kongan, Wu

    2018-06-01

    "Beautiful rural construction" is a systematic project, rural energy is one of the important contents of its construction. In accordance with the concept of eco-friendly construction, Beijing carried out a thorough "structural adjustment of rural energy optimization," "Earthquake energy-saving projects of rural housing" and other measures. By conventional heating technology research in Beijing 13 counties and 142 villages, we predict the future of rural energy will further the implementation of solar heating, electric heating and other new green energy technologies. It is suggested to establish the "Beijing Rural Information Service Platform" and "Beautiful Rural Information Resource Bank" through the means of informatization, which will greatly strengthen the regulation and control of rural people-land relationship and realize the systematic optimization, making the cities and villages have. Space for human survival and sustainable development.

  9. Integrating evidence-based practices for increasing cancer screenings in safety net health systems: a multiple case study using the Consolidated Framework for Implementation Research.

    PubMed

    Liang, Shuting; Kegler, Michelle C; Cotter, Megan; Emily, Phillips; Beasley, Derrick; Hermstad, April; Morton, Rentonia; Martinez, Jeremy; Riehman, Kara

    2016-08-02

    Implementing evidence-based practices (EBPs) to increase cancer screenings in safety net primary care systems has great potential for reducing cancer disparities. Yet there is a gap in understanding the factors and mechanisms that influence EBP implementation within these high-priority systems. Guided by the Consolidated Framework for Implementation Research (CFIR), our study aims to fill this gap with a multiple case study of health care safety net systems that were funded by an American Cancer Society (ACS) grants program to increase breast and colorectal cancer screening rates. The initiative funded 68 safety net systems to increase cancer screening through implementation of evidence-based provider and client-oriented strategies. Data are from a mixed-methods evaluation with nine purposively selected safety net systems. Fifty-two interviews were conducted with project leaders, implementers, and ACS staff. Funded safety net systems were categorized into high-, medium-, and low-performing cases based on the level of EBP implementation. Within- and cross-case analyses were performed to identify CFIR constructs that influenced level of EBP implementation. Of 39 CFIR constructs examined, six distinguished levels of implementation. Two constructs were from the intervention characteristics domain: adaptability and trialability. Three were from the inner setting domain: leadership engagement, tension for change, and access to information and knowledge. Engaging formally appointed internal implementation leaders, from the process domain, also distinguished level of implementation. No constructs from the outer setting or individual characteristics domain differentiated systems by level of implementation. Our study identified a number of influential CFIR constructs and illustrated how they impacted EBP implementation across a variety of safety net systems. Findings may inform future dissemination efforts of EBPs for increasing cancer screening in similar settings. Moreover, our analytic approach is similar to previous case studies using CFIR and hence could facilitate comparisons across studies.

  10. Exploratory Study on the Patterns of Online Interaction and Knowledge Co-Construction in Project-Based Learning

    ERIC Educational Resources Information Center

    Heo, Heeok; Lim, Kyu Yon; Kim, Youngsoo

    2010-01-01

    This study aims to investigate the patterns and the quality of online interaction during project-based learning (PjBL) on both micro and macro levels. To achieve this purpose, PjBL was implemented with online group activities in an undergraduate course. Social network analysis (SNA) and content analysis were employed to analyze online interaction…

  11. Construction of transit-based development

    DOT National Transportation Integrated Search

    2001-09-01

    This project reviews policies and legislative programs that can be adopted at all levels of government to encourage transit-based development. The study focuses on local government implementation since it is cities and counties that have the land use...

  12. New procedures of ergonomics design in a large oil company.

    PubMed

    Alhadeff, Cynthia Mossé; Silva, Rosana Fernandes da; Reis, Márcia Sales dos

    2012-01-01

    This study presents the challenge involved in the negotiation and construction of a standard process in a major petroleum company that has the purpose of guiding the implementation of ergonomic studies in the development of projects, systemising the implementation of ergonomics design. The standard was created by a multi-disciplinary working group consisting of specialists in ergonomics, who work in a number of different areas of the company. The objective was to guide "how to" undertake ergonomics in all projects, taking into consideration the development of the ergonomic appraisals of work. It also established that all the process, in each project phase, should be accompanied by a specialist in ergonomics. This process as an innovation in the conception of projects in this company, signals a change of culture, and, for this reason requires broad dissemination throughout the several company leadership levels, and training of professionals in projects of ergonomics design. An implementation plan was also prepared and approved by the corporate governance, complementing the proposed challenge. In this way, this major oil company will implement new procedures of ergonomics design to promote health, safety, and wellbeing of the workforce, besides improving the performance and reliability of its systems and processes.

  13. Construction of a high-tech operating room for image-guided surgery using VR.

    PubMed

    Suzuki, Naoki; Hattori, Asaki; Suzuki, Shigeyuki; Otake, Yoshito; Hayashibe, Mitsuhiro; Kobayashi, Susumu; Nezu, Takehiko; Sakai, Haruo; Umezawa, Yuji

    2005-01-01

    This project aimed to construct an operating room to implement high dimensional (3D, 4D) medical imaging and medical virtual reality techniques that would enable clinical tests for new surgical procedures. We designed and constructed such an operating room at Dai-san Hospital, the Jikei Univ. School of Medicine, Tokyo, Japan. The room was equipped with various facilities for image-guided, robot and tele- surgery. In this report, we describe an outline of our "high-tech operating room" and future plans.

  14. Risk management analysis for construction of Kutai Kartanegara bridge-East Kalimantan-Indonesia

    NASA Astrophysics Data System (ADS)

    Azis, Subandiyah

    2017-11-01

    Many sources of risk that may impede the achievement of the project objectives through either cost or quality and time, especially for bridges that have collapsed before, so when the implementation of possible hazard / high hazard so when should the possible hazard/high hazard be implemented The purpose of this research is to identify, to analyze risks by classifying the risks using the method of Risk Breakdown Structure (RBS) and managing the dominant risk of execution of the installation work to determine the handling of the steel frame in order to maximize the positive and minimize the incidence of adverse events. The results of this study indicate there are 15 sources of risks are identified, and there are 6 risk indicates the dominant risks. Mitigation performed on the dominant risks unacceptable i.e. Project factor that shows the delays in the arrival of materials due to locations, schedule of the arrival of materials should be tailored to the needs of the field and the amount of material that comes with the required field should also be evaluated. The result is expected to be a guideline for identifying risks and mitigation measures for further research. Subsequent researchers to pay attention on the security factor that implementation time does not affect the productivity of work in construction projects.

  15. Archetype Model-Driven Development Framework for EHR Web System

    PubMed Central

    Kimura, Eizen; Ishihara, Ken

    2013-01-01

    Objectives This article describes the Web application framework for Electronic Health Records (EHRs) we have developed to reduce construction costs for EHR sytems. Methods The openEHR project has developed clinical model driven architecture for future-proof interoperable EHR systems. This project provides the specifications to standardize clinical domain model implementations, upon which the ISO/CEN 13606 standards are based. The reference implementation has been formally described in Eiffel. Moreover C# and Java implementations have been developed as reference. While scripting languages had been more popular because of their higher efficiency and faster development in recent years, they had not been involved in the openEHR implementations. From 2007, we have used the Ruby language and Ruby on Rails (RoR) as an agile development platform to implement EHR systems, which is in conformity with the openEHR specifications. Results We implemented almost all of the specifications, the Archetype Definition Language parser, and RoR scaffold generator from archetype. Although some problems have emerged, most of them have been resolved. Conclusions We have provided an agile EHR Web framework, which can build up Web systems from archetype models using RoR. The feasibility of the archetype model to provide semantic interoperability of EHRs has been demonstrated and we have verified that that it is suitable for the construction of EHR systems. PMID:24523991

  16. ENCOMPASS: A SAGA based environment for the compositon of programs and specifications, appendix A

    NASA Technical Reports Server (NTRS)

    Terwilliger, Robert B.; Campbell, Roy H.

    1985-01-01

    ENCOMPASS is an example integrated software engineering environment being constructed by the SAGA project. ENCOMPASS supports the specification, design, construction and maintenance of efficient, validated, and verified programs in a modular programming language. The life cycle paradigm, schema of software configurations, and hierarchical library structure used by ENCOMPASS is presented. In ENCOMPASS, the software life cycle is viewed as a sequence of developments, each of which reuses components from the previous ones. Each development proceeds through the phases planning, requirements definition, validation, design, implementation, and system integration. The components in a software system are modeled as entities which have relationships between them. An entity may have different versions and different views of the same project are allowed. The simple entities supported by ENCOMPASS may be combined into modules which may be collected into projects. ENCOMPASS supports multiple programmers and projects using a hierarchical library system containing a workspace for each programmer; a project library for each project, and a global library common to all projects.

  17. Need of risk management practice amongst bumiputera contractors in Malaysia construction industries

    NASA Astrophysics Data System (ADS)

    Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul

    2017-11-01

    Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.

  18. The Atacama Large Aperture Submm/mm Telescope (AtLAST) Project

    NASA Astrophysics Data System (ADS)

    Bertoldi, Frank

    2018-01-01

    In the past decade a strong case has been made for the construction of a next generation, 25 to 40-meter large submillimeter telescope, most notably through the CCAT and the Japanese LST projects. Although much effort had been spent on detailed science cases and technological studies, none of these projects have yet secured funding to advance to construction. We invite the interested community to join a study of the scientific merit, technical implementation, and financial path toward what we coin the "Atacama Large Submillimeter Telescope" (AtLAST). Through this community workshop, working groups, and a final report to be released in early 2019, we hope to motivate the global astronomy community to value and support the realization of such a facility.

  19. Organizational-economic model of formation of socio-commercial multifunctional complex in the construction of high-rise buildings

    NASA Astrophysics Data System (ADS)

    Kirillova, Ariadna; Prytkova, Oksana O.

    2018-03-01

    The article is devoted to the features of the formation of the organizational and economic model of the construction of a socio-commercial multifunctional complex for high-rise construction. Authors have given examples of high-altitude multifunctional complexes in Moscow, analyzed the advantages and disadvantages in the implementation of multifunctional complexes, stressed the need for a holistic strategic approach, allowing to take into account the prospects for the development of the city and the creation of a comfortable living environment. Based on the analysis of multifunctional complexes features, a matrix of SWOT analysis was compiled. For the development of cities and improving the quality of life of the population, it is proposed to implement a new type of multifunctional complexes of a joint social and commercial direction, including, along with the implementation of office areas - schools, polyclinics, various sports facilities and cultural and leisure centers (theatrical, dance, studio, etc.). The approach proposed in the article for developing the model is based on a comparative evaluation of the multifunctional complex project of a social and commercial direction implemented at the expense of public-private partnership in the form of a concession agreement and a commercial multifunctional complex being built at the expense of the investor. It has been proved by calculations that the obtained indicators satisfy the conditions of expediency of the proposed organizational-economic model and the project of the social and commercial multifunctional complex is effective.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maurer, D.

    In January 1986, the Becon Construction Company - an open-shop contractor based in Houston, Texas - mobilized a work force to a construction project location at the Belridge Oil Field, near Bakersfield, California. The construction craftsmen and helpers in Becon's work force were expected to improve their level of productivity as the work proceeded because of the knowledge and skills that they would acquire as a result of the repetitive nature of the work. As it was originally organized, the Becon HOTS project represented almost a pure laboratory environment in which to collect data concerning the learning effect on workermore » productivity as well as to statistically isolate the impact on productivity of such external factors as weather, absenteeism, turnover, and especially work methods improvement techniques and pay incentives. From the outset of the HOTS project, the project manager had established an accurate system to quantitatively measure and compare the total manhours that each crew - civil, mechanical, electrical, and prefabrication -- performed at individual HOTS construction locations. Additionally, it was initially assumed that the project manager would be relatively free to implement changes to the job site conditions involving incentive pay and work methods improvement. The subsequent effect of these changes on the productivity of separate work crews could then be evaluated in terms of measured manhours per crew per HOTS.« less

  1. The impact of occupational health and safety regulations on prevention through design in construction projects: Perspectives from Spain and the United Kingdom.

    PubMed

    Martínez-Aires, María Dolores; Rubio Gámez, María Carmen; Gibb, Alistair

    2015-01-01

    Since the mid-1990 s, Prevention through Design (PtD) has become increasingly prevalent in the built environment. The acceptance of PtD has largely been due to the removal or reduction of risks during the execution phase of construction projects. European States have had the added impetus of national legislation. This paper analyzes the influence of European Union Directive 92/57/EEC on occupational safety and health injury prevention in the project design phase. Qualitative methods comprised individual semi-structured interviews and focus groups with a panel of experts. Sixty individuals from construction and related professions (architects, engineers, constructors, developers, and other construction experts) answered 17 key questions to establish national perceptions of the effectiveness of Directive 92/57/EEC in Spain and the United Kingdom (UK). The implementation of PtD in the project design phase in the UK is clearer since the regulations explicitly state the obligations of project designers as well as those of the coordinator. Interviews with Spanish experts show that, in Spain, the prevention culture is less frequently realized. The most significant differences between the European Directive and national regulations which influence PtD are linked to the Health and Safety Coordinator, and Health and Safety documents.

  2. Integrating Cost-effective Rollover Protective Structure Installation in High School Agricultural Mechanics: A Feasibility Study.

    PubMed

    Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan

    2015-01-01

    This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.

  3. Finally Underway: Implementation of the Port Hope Area Initiative - 13151

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fahey, Christine A.; Palmeter, Tim; Blanchette, Marcia

    2013-07-01

    Two distinct yet closely related waste remediation projects are finally underway in Canada under the Port Hope Area Initiative (PHAI) which aims to clean up 1.7 million cubic metres (m{sup 3}) of low-level radioactive waste (LLRW) arising from 60 years of uranium and radium operations. Under the PHAI, the Port Hope Project and the smaller Port Granby Project will result in the consolidation of the LLRW within two highly engineered, above-ground mounds, to be constructed within the municipalities of Port Hope and Clarington. These projects will fulfill the federal government commitment to the safe, long-term management of the LLRW, asmore » set out in the legal agreement signed by the government and the host municipalities in 2001. The federal authorization to commence PHAI Remediation and Construction Phase 2 was received in late 2011 and several enabling infrastructure construction and radiological survey contracts were awarded in 2012. The contracts to remediate the waste sites and construct the new engineered mounds will be tendered in 2013. At the end of Phase 2, environmental risks will be substantially mitigated, land development restrictions lifted, and an honourable legacy left for future generations. (authors)« less

  4. Carbon footprint for HMA and PCC pavements.

    DOT National Transportation Integrated Search

    2011-07-25

    Motivated by the need to address challenges of global climate change, this study develops and implements a project : based life cycle framework that can be used to estimate the carbon footprint for typical construction work-items : found in reconstru...

  5. Evaluation of warm mix asphalt technology in flexible pavements.

    DOT National Transportation Integrated Search

    2009-09-01

    The primary goal of this research project is to quantify the performance of field produced and placed mixtures that utilize WMA technology and develop a framework for design, construction, and implementation of this technology in Louisiana. This rese...

  6. Industrial Automation Mechanic Model Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Toledo Public Schools, OH.

    This document describes a demonstration program that developed secondary level competency-based instructional materials for industrial automation mechanics. Program activities included task list compilation, instructional materials research, learning activity packet (LAP) development, construction of lab elements, system implementation,…

  7. 23 CFR 924.7 - Program structure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HIGHWAY SAFETY HIGHWAY SAFETY IMPROVEMENT PROGRAM... implementation through highway safety improvement projects. The HSIP includes construction and operational improvements on high risk rural roads, and elimination of hazards at railway-highway grade crossings. (b) The...

  8. 23 CFR 924.7 - Program structure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HIGHWAY SAFETY HIGHWAY SAFETY IMPROVEMENT PROGRAM... implementation through highway safety improvement projects. The HSIP includes construction and operational improvements on high risk rural roads, and elimination of hazards at railway-highway grade crossings. (b) The...

  9. Bringing Space Science into the Kindergarten Classroom

    NASA Technical Reports Server (NTRS)

    Bonett, D. M.; Little, K. E.

    2000-01-01

    With the advent of probes to Mars and the construction of the ISS, it is not presumptuous to introduce 5-year-olds to space science. A variety of projects have been implemented to integrate space science into the kindergarten curriculum.

  10. Embankment quality and assessment of moisture control implementation.

    DOT National Transportation Integrated Search

    2016-02-01

    A specification for contractor moisture quality control (QC) in roadway embankment construction has been in use for approximately 10 : years in Iowa on about 190 projects. The use of this QC specification and the development of the soils certificatio...

  11. Hualapai Tribal Utility Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hualapai Tribal Nation

    The first phase of the Hualapai Tribal Utility Development Project (Project) studied the feasibility of establishing a tribally operated utility to provide electric service to tribal customers at Grand Canyon West (see objective 1 below). The project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West and developing a financial model, based on rates to be charged to Grand Canyon West customers connected to the solar systems, that would provide sufficient revenue for a Tribal Utility Authority to operate and maintain those systems. The objective to establish a central powermore » grid over which the TUA would have authority and responsibility had to be modified because the construction schedule of GCW facilities, specifically the new air terminal, did not match up with the construction schedule for the solar power system. Therefore, two distributed systems were constructed instead of one central system with a high voltage distribution network. The Hualapai Tribal Council has not taken the action necessary to establish the Tribal Utility Authority that could be responsible for the electric service at GCW. The creation of a Tribal Utility Authority (TUA) was the subject of the second objective of the project. The second phase of the project examined the feasibility and strategy for establishing a tribal utility to serve the remainder of the Hualapai Reservation and the feasibility of including wind energy from a tribal wind generator in the energy resource portfolio of the tribal utility (see objective 2 below). It is currently unknown when the Tribal Council will consider the implementation of the results of the study. Objective 1 - Develop the basic organizational structure and operational strategy for a tribally controlled utility to operate at the Tribe’s tourism enterprise district, Grand Canyon West. Coordinate the development of the Tribal Utility structure with the development of the Grand Canyon West Power Project construction of the power infrastructure at Grand Canyon West. Develop the maintenance and operations capacity necessary to support utility operations. Develop rates for customers on the Grand Canyon West “mini-grid” sufficient for the tribal utility to be self-sustaining. Establish an implementation strategy for tribal utility service at Grand Canyon West Objective 2 - Develop a strategy for tribal utility takeover of electric service on the Reservation. Perform a cost analysis of Reservation electrical service. Develop an implementation strategy for tribal takeover of Reservation electrical service. Examine options and costs associated with integration of the Tribe’s wind resources.« less

  12. Forecasting Construction Cost Index based on visibility graph: A network approach

    NASA Astrophysics Data System (ADS)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  13. Environmental Assessment for Multiple Projects at Laughlin Air Forc Base, TX

    DTIC Science & Technology

    2013-02-06

    Table 5 5 Stormwater Concrete Removal 6 Area Disturbed (acres) Average Removal Depth (ft) Concrete Density (lb/ft 3 ) Concrete Removed (lb...600 feet to the north; and, • Repair and improve stormwater drainage and steep slopes at the Laughlin AFB airfield. Construction would include site...of exposed soils from stormwater runoff, best management practices (BMPs) would be implemented during construction and demolition (C&D). These

  14. Making sense of health information technology implementation: A qualitative study protocol.

    PubMed

    Kitzmiller, Rebecca R; Anderson, Ruth A; McDaniel, Reuben R

    2010-11-29

    Implementing new practices, such as health information technology (HIT), is often difficult due to the disruption of the highly coordinated, interdependent processes (e.g., information exchange, communication, relationships) of providing care in hospitals. Thus, HIT implementation may occur slowly as staff members observe and make sense of unexpected disruptions in care. As a critical organizational function, sensemaking, defined as the social process of searching for answers and meaning which drive action, leads to unified understanding, learning, and effective problem solving -- strategies that studies have linked to successful change. Project teamwork is a change strategy increasingly used by hospitals that facilitates sensemaking by providing a formal mechanism for team members to share ideas, construct the meaning of events, and take next actions. In this longitudinal case study, we aim to examine project teams' sensemaking and action as the team prepares to implement new information technology in a tiertiary care hospital. Based on management and healthcare literature on HIT implementation and project teamwork, we chose sensemaking as an alternative to traditional models for understanding organizational change and teamwork. Our methods choices are derived from this conceptual framework. Data on project team interactions will be prospectively collected through direct observation and organizational document review. Through qualitative methods, we will identify sensemaking patterns and explore variation in sensemaking across teams. Participant demographics will be used to explore variation in sensemaking patterns. Outcomes of this research will be new knowledge about sensemaking patterns of project teams, such as: the antecedents and consequences of the ongoing, evolutionary, social process of implementing HIT; the internal and external factors that influence the project team, including team composition, team member interaction, and interaction between the project team and the larger organization; the ways in which internal and external factors influence project team processes; and the ways in which project team processes facilitate team task accomplishment. These findings will lead to new methods of implementing HIT in hospitals.

  15. Making sense of health information technology implementation: A qualitative study protocol

    PubMed Central

    2010-01-01

    Background Implementing new practices, such as health information technology (HIT), is often difficult due to the disruption of the highly coordinated, interdependent processes (e.g., information exchange, communication, relationships) of providing care in hospitals. Thus, HIT implementation may occur slowly as staff members observe and make sense of unexpected disruptions in care. As a critical organizational function, sensemaking, defined as the social process of searching for answers and meaning which drive action, leads to unified understanding, learning, and effective problem solving -- strategies that studies have linked to successful change. Project teamwork is a change strategy increasingly used by hospitals that facilitates sensemaking by providing a formal mechanism for team members to share ideas, construct the meaning of events, and take next actions. Methods In this longitudinal case study, we aim to examine project teams' sensemaking and action as the team prepares to implement new information technology in a tiertiary care hospital. Based on management and healthcare literature on HIT implementation and project teamwork, we chose sensemaking as an alternative to traditional models for understanding organizational change and teamwork. Our methods choices are derived from this conceptual framework. Data on project team interactions will be prospectively collected through direct observation and organizational document review. Through qualitative methods, we will identify sensemaking patterns and explore variation in sensemaking across teams. Participant demographics will be used to explore variation in sensemaking patterns. Discussion Outcomes of this research will be new knowledge about sensemaking patterns of project teams, such as: the antecedents and consequences of the ongoing, evolutionary, social process of implementing HIT; the internal and external factors that influence the project team, including team composition, team member interaction, and interaction between the project team and the larger organization; the ways in which internal and external factors influence project team processes; and the ways in which project team processes facilitate team task accomplishment. These findings will lead to new methods of implementing HIT in hospitals. PMID:21114860

  16. Performance Results for Massachusetts and Rhode Island Deep Energy Retrofit Pilot Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gates, C.; Neuhauser, K.

    2014-03-01

    Between December, 2009 and December, 2012 42 deep energy retrofit (DER) projects were completed through a DER pilot program sponsored by National Grid and conducted in Massachusetts and Rhode Island. 37 of these projects were comprehensive retrofits while 5 were partial DERs, meaning that high performance retrofit was implemented for a single major enclosure component or a limited number of major enclosure components. The 42 DER projects represent 60 units of housing. The comprehensive projects all implemented a consistent 'package' of measures in terms of the performance targeted for major building components. Projects exhibited some variations in the approach tomore » implementing the retrofit package. Pre- and post-retrofit air leakage measurements were performed for each of the projects. Each project also reported information about project costs including identification of energy-related costs. Post-retrofit energy-use data was obtained for 29 of the DER projects. Post-retrofit energy use was analyzed based on the net energy used by the DER project regardless of whether the energy was generated on site or delivered to the site. Homeowner surveys were returned by 12 of the pilot participants. Based on the community experience, this DER package is expected to result in yearly source energy use near 110 MMBtu/year or approximately 40% below the Northeast regional average. Larger to medium sized homes that successful implement these retrofits can be expected to achieve source EUI that is comparable to Passive House targets for new construction. The community of DER projects show post-retrofit airtightness below 1.5 ACH50 to be eminently achievable.« less

  17. Development, field testing, and implementation of improved bridge parapet designs.

    DOT National Transportation Integrated Search

    2015-03-01

    A total of 22 test parapets was constructed as part of this project to evaluate different approaches to address : premature cracking. The experiments included the use of deeper saw cuts through glass fiber reinforced polymer : (GFRP) reinforcement or...

  18. IVHS Denver Metro Area, Master Plan, Appendix A, Project Descriptions

    DOT National Transportation Integrated Search

    1994-02-01

    THIS ACTIVITY INVOLVES THE CONCEPTUAL DESIGN, CONSTRUCTION AND IMPLEMENTATION OF A TRAFFIC OPERATIONS CENTER (TOC) FOR THE DENVER AREA. : ESTABLISHING A TOC IS CENTRAL TO THE SUCCESS OF IVHS IN THE DENVER AREA.ITS IMPORTANCE WILL CONTINUE BEYOND T...

  19. Operational Energy Strategy: Implementation Plan

    DTIC Science & Technology

    2012-03-01

    U.S. forces to obtain the energy required to perform their missions. To achieve this goal, the Department will identify and remediate energy-related...construction projects related to hydropower and biogas to build local capacity in Afghanistan. Responsibilities. The Joint Staff and Military

  20. 23 CFR 924.7 - Program structure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Program structure. 924.7 Section 924.7 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HIGHWAY SAFETY HIGHWAY SAFETY IMPROVEMENT PROGRAM... implementation through highway safety improvement projects. The HSIP includes construction and operational...

  1. 23 CFR 924.7 - Program structure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Program structure. 924.7 Section 924.7 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HIGHWAY SAFETY HIGHWAY SAFETY IMPROVEMENT PROGRAM... implementation through highway safety improvement projects. The HSIP includes construction and operational...

  2. Design and Construction of a Positron Emission Tomography (PET) Unit and Medical Applications with GEANT Detector Simulation Package

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karagoz, Muge

    1998-01-01

    In order to investigate the possibility of the construction of a sample PET coincidence unit in our HEP laboratory, a setup with two face to face PMTs and two 2x8 Csi(Tl) scintillator matrices has been constructed. In this setup, 1-D projections of a pointlike 22 Na positron source at different angles have been measured. Using these projections a 2-D image has been formed. Monte Carlo studies of this setup have been implemented using the detector simulation tool in CERN program library, GEANT. Again with GEANT a sample human body is created to study the effects of proton therapy. Utilization ofmore » the simulation as a pretherapy tool is also investigated.« less

  3. Implementing the Common Core of Constructs: Measurement and Interviewer Training. The Project on State-Level Child Outcomes. Proceedings of the Meeting of the Operational Phase of the Project on State-Level Child Outcome (1st, Washington, DC, December 9, 1997).

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The Project on State-Level Child Outcomes is designed to assist states and other groups to improve the measurement of child outcomes in state welfare evaluations and in other state data systems. This report summarizes the first meeting of the five states (Connecticut, Florida, Indiana, Iowa, Minnesota) that participated in the operational phase of…

  4. A Spanish model for quantification and management of construction waste.

    PubMed

    Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio

    2009-09-01

    Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.

  5. An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach.

    PubMed

    Bai, Libiao; Wang, Hailing; Huang, Ning; Du, Qiang; Huang, Youdan

    2018-06-23

    The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP) based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP) environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP)-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.

  6. Assessing students' sentiments towards the use of a Building Information Modelling (BIM) learning platform in a construction project management course

    NASA Astrophysics Data System (ADS)

    Suwal, Sunil; Singh, Vishal

    2018-07-01

    Building Information Modelling (BIM) tools and processes are increasingly adopted and implemented in the construction industry. Consequently, BIM education is considered increasingly important in Architecture, Engineering and Construction (AEC) education. While most of the research and literature on BIM education in engineering studies has focused on BIM implementation strategies, processes, benefits, and challenges, there is limited study on students' perception towards the implementation of BIM courses, or about online BIM learning platforms, or about the BIM tools themselves. Therefore, this paper takes the first steps towards addressing this gap. This study analyses students' (57 students) perception and sentiments towards the use of an online BIM learning platform and explores the potential implications of the findings for BIM education. The findings suggest that online BIM learning platforms are highly rated by students as a positive learning experience, indicating the need for greater integration of such tools and approaches in AEC courses.

  7. Adoption of Building Information Modelling in project planning risk management

    NASA Astrophysics Data System (ADS)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  8. Occupational health and safety in the Moroccan construction sites: preliminary diagnosis

    NASA Astrophysics Data System (ADS)

    Tarik, Bakeli; Adil, Hafidi Alaoui

    2018-05-01

    Managing occupational health and safety on Moroccan construction sector represents the first step for projects' success. In fact, by avoiding accidents, all the related direct and indirect costs and delays can be prevented. That leads to an important question always asked by any project manager: what are the factors responsible for accidents? How can they be avoided? Through this research, the aim is to go through these questions, to contribute in occupational health and safety principles understanding, to identify construction accidentology and risk management opportunities and to approach the case of Moroccan construction sites by an accurate diagnosis. The approach is to make researchers, managers, stakeholders and deciders aware about the criticality of construction sites health and safety situation. And, to do the first step for a scientific research project in relation with health and safety in the Moroccan construction sector. For this, the paper will study the related state of art namely about construction sites accidents causation, and will focus on Reason's `Swiss cheese' model and its utilization for Moroccan construction sites health and safety diagnosis. The research will end with an estimation of an accidents fatality rate in the Moroccan construction sector and a benchmarking with the international rates. Finally, conclusions will be presented about the necessity of Occupational Health and Safety Management System (OHSMS) implementation, which shall cover all risk levels, and insure, at the same time, that the necessary defenses against accidents are on place.

  9. Implementation of GPS Machine Controlled Grading - Phase III (2008) and Technical Training

    DOT National Transportation Integrated Search

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading projects. These specifications and proc...

  10. Instrumentation and monitoring of rustic road geosynthetic reinforced soil (GRS) integrated bridge system (IBS).

    DOT National Transportation Integrated Search

    2016-11-01

    J. Erik Loehr ; orcid.org/0000-0001-6035-8416 : An instrumentation and monitoring system was implemented for a geosynthetic reinforced soil (GRS) integrated bridge : system (IBS) constructed in Boone County, Missouri in 2014. The project location is ...

  11. Continued implementation of high performance thin overlays in Texas districts.

    DOT National Transportation Integrated Search

    2017-06-22

    As part of Research Project 0-5598, outputs include guidelines and specifications on how a district can design and construct long-life overlays using the concept of balanced mix design; and training materials describing the best ways to select, desig...

  12. GBI assessment checklist: Level of awareness of the contractors in the Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Marhani, M. A.; Muksain, M. A. S.

    2018-02-01

    Malaysia has developed Green Building Index (GBI) as the green rating tool for buildings and townships to encourage sustainability in the construction industry. Understanding the roles and tasks of a contractor is essential in accomplishing the GBI assessment on a green building project. However, there are challenges in adapting the GBI. The objective of this paper is to identify the knowledge of contractor for each area of assessments in GBI’s checklist. Data were collected through the questionnaire surveys to the selected contractors, which were involved in GBI projects. The findings revealed that most of the respondents agreed and acknowledged the impact of each criterion in the assessment. Thus, it is highly recommended to educate and change the public perception on the awareness of the green building. Aside, more research and development (R&D) process should be encouraged to accelerate the GBI certificate implementation in the construction industry. In conclusion, proper education training, more legislative and financial framework are essential for the future of green building projects.

  13. Design and construction of a remote piloted flying wing. B.S. Thesis

    NASA Technical Reports Server (NTRS)

    Costa, Alfred J.; Koopman, Fritz; Soboleski, Craig; Trieu, Thai-Ba; Duquette, Jaime; Krause, Scott; Susko, David; Trieu, Thuyba

    1994-01-01

    Currently, there is a need for a high-speed, high-lift civilian transport. Although unconventional, a flying wing could fly at speeds in excess of Mach 2 and still retain the capacity of a 747. The design of the flying wing is inherently unstable since it lacks a fuselage and a horizontal tail. The project goal was to design, construct, fly, and test a remote-piloted scale model flying wing. The project was completed as part of the NASA/USRA Advanced Aeronautics Design Program. These unique restrictions required us to implement several fundamental design changes from last year's Elang configuration including wing sweepback and wingtip endplates. Unique features such as a single ducted fan engine, composite structural materials, and an electrostatic stability system were incorporated. The result is the Banshee '94. Our efforts will aid future projects in design and construction techniques so that a viable flying wing can become an integral part of the aviation industry.

  14. Based on the development status of British BIM, exploring China’s BIM road

    NASA Astrophysics Data System (ADS)

    Tiangang, Chu; hui, Li; shanjun, Zhang; Ningshan, Jiang; Dan, Zhang; Yu, Zhang; Guibo, Bao

    2018-05-01

    This article mainly analyses the development and application status and development trend of BIM technology after the implementation of the British government, to explore the policies and methods that our government should carry out in the development of BIM. The article also summarizes and analyses the relevant policies and standards implemented by various provincial and municipal governments in promoting BIM technology in China and summarizes the strengths and weaknesses of each other by comparing the development status of the implementation of BIM policies in various provinces and cities. The article also analysed the obstacles encountered in the implementation of some specific projects at the current stage of BIM technology, and summarized the feasible solutions. The article mainly analyses the application prospects of BIM from the technical aspects of design, the application of technology in the construction process, and the strategic implementation and operation of the company, and provides a reference for promoting the application of BIM in the construction industry in China, especially in the western region.

  15. Dynamic Metabolic Model Building Based on the Ensemble Modeling Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liao, James C.

    2016-10-01

    Ensemble modeling of kinetic systems addresses the challenges of kinetic model construction, with respect to parameter value selection, and still allows for the rich insights possible from kinetic models. This project aimed to show that constructing, implementing, and analyzing such models is a useful tool for the metabolic engineering toolkit, and that they can result in actionable insights from models. Key concepts are developed and deliverable publications and results are presented.

  16. The Geysers pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.; Allen, E.

    A unique public/private partnership of local, state, federal and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quotes} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of the The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function and environmental impacts, its implementation hasmore » required: (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation and financing of the project, and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less

  17. Turning community wastes into sustainable geothermal energy: The S.E. Geysers effluent pipeline project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.; Allen, E.

    A unique public/private partnership of local, state, federal, and corporate stakeholders are constructing the world`s first wastewater-to-electricity system at The Geysers. A rare example of a genuinely {open_quotes}sustainable{close_quote} energy system, three Lake County communities will recycle their treated wastewater effluent through the southeast portion of The Geysers steamfield to produce approximately 625,000 MWh annually from six existing geothermal power plants. In effect, the communities` effluent will produce enough power to indefinitely sustain their electric needs, along with enough extra power for thousands of other California consumers. Because of the project`s unique sponsorship, function, and environmental impacts, its implementation has required:more » (1) preparation of a consolidated state environmental impact report (EIR) and federal environmental impact statement (EIS), and seven related environmental agreements and management plans; (2) acquisition of 25 local, state, and federal permits; (3) negotiation of six federal and state financial assistance agreements; (4) negotiation of six participant agreements on construction, operation, and financing of the project; and (5) acquisition of 163 easements from private land owners for pipeline construction access and ongoing maintenance. The project`s success in efficiently and economically completing these requirements is a model for geothermal innovation and partnering throughout the Pacific Rim and elsewhere internationally.« less

  18. Safety Early Warning Research for Highway Construction Based on Case-Based Reasoning and Variable Fuzzy Sets

    PubMed Central

    Liu, Yan; Xu, Zhen-Jun

    2013-01-01

    As a high-risk subindustry involved in construction projects, highway construction safety has experienced major developments in the past 20 years, mainly due to the lack of safe early warnings in Chinese construction projects. By combining the current state of early warning technology with the requirements of the State Administration of Work Safety and using case-based reasoning (CBR), this paper expounds on the concept and flow of highway construction safety early warnings based on CBR. The present study provides solutions to three key issues, index selection, accident cause association analysis, and warning degree forecasting implementation, through the use of association rule mining, support vector machine classifiers, and variable fuzzy qualitative and quantitative change criterion modes, which fully cover the needs of safe early warning systems. Using a detailed description of the principles and advantages of each method and by proving the methods' effectiveness and ability to act together in safe early warning applications, effective means and intelligent technology for a safe highway construction early warning system are established. PMID:24191134

  19. Safety early warning research for highway construction based on case-based reasoning and variable fuzzy sets.

    PubMed

    Liu, Yan; Yi, Ting-Hua; Xu, Zhen-Jun

    2013-01-01

    As a high-risk subindustry involved in construction projects, highway construction safety has experienced major developments in the past 20 years, mainly due to the lack of safe early warnings in Chinese construction projects. By combining the current state of early warning technology with the requirements of the State Administration of Work Safety and using case-based reasoning (CBR), this paper expounds on the concept and flow of highway construction safety early warnings based on CBR. The present study provides solutions to three key issues, index selection, accident cause association analysis, and warning degree forecasting implementation, through the use of association rule mining, support vector machine classifiers, and variable fuzzy qualitative and quantitative change criterion modes, which fully cover the needs of safe early warning systems. Using a detailed description of the principles and advantages of each method and by proving the methods' effectiveness and ability to act together in safe early warning applications, effective means and intelligent technology for a safe highway construction early warning system are established.

  20. Scheduling of House Development Projects with CPM and PERT Method for Time Efficiency (Case Study: House Type 36)

    NASA Astrophysics Data System (ADS)

    Kholil, Muhammad; Nurul Alfa, Bonitasari; Hariadi, Madjumsyah

    2018-04-01

    Network planning is one of the management techniques used to plan and control the implementation of a project, which shows the relationship between activities. The objective of this research is to arrange network planning on house construction project on CV. XYZ and to know the role of network planning in increasing the efficiency of time so that can be obtained the optimal project completion period. This research uses descriptive method, where the data collected by direct observation to the company, interview, and literature study. The result of this research is optimal time planning in project work. Based on the results of the research, it can be concluded that the use of the both methods in scheduling of house construction project gives very significant effect on the completion time of the project. The company’s CPM (Critical Path Method) method can complete the project with 131 days, PERT (Program Evaluation Review and Technique) Method takes 136 days. Based on PERT calculation obtained Z = -0.66 or 0,2546 (from normal distribution table), and also obtained the value of probability or probability is 74,54%. This means that the possibility of house construction project activities can be completed on time is high enough. While without using both methods the project completion time takes 173 days. So using the CPM method, the company can save time up to 42 days and has time efficiency by using network planning.

  1. VHDL implementation of feature-extraction algorithm for the PANDA electromagnetic calorimeter

    NASA Astrophysics Data System (ADS)

    Guliyev, E.; Kavatsyuk, M.; Lemmens, P. J. J.; Tambave, G.; Löhner, H.; Panda Collaboration

    2012-02-01

    A simple, efficient, and robust feature-extraction algorithm, developed for the digital front-end electronics of the electromagnetic calorimeter of the PANDA spectrometer at FAIR, Darmstadt, is implemented in VHDL for a commercial 16 bit 100 MHz sampling ADC. The source-code is available as an open-source project and is adaptable for other projects and sampling ADCs. Best performance with different types of signal sources can be achieved through flexible parameter selection. The on-line data-processing in FPGA enables to construct an almost dead-time free data acquisition system which is successfully evaluated as a first step towards building a complete trigger-less readout chain. Prototype setups are studied to determine the dead-time of the implemented algorithm, the rate of false triggering, timing performance, and event correlations.

  2. Statewide implementation of the total pavement acceptance device (TPAD) : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    Construction and development of the Total Pavement Acceptance Device (TPAD) was completed at the end of August 2012 through TxDOT Research Project 0-6005-01. The TPAD is a multi-function pavement evaluation device used to profile continuously along p...

  3. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  4. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  5. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  6. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  7. 33 CFR 279.10 - Implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... boundaries, conduct of regional studies and content and format of report requirements. As a minimum, one... projects with existing use patterns and constructed facilities. (b) Regional studies are prerequisite to... not be restricted either to States or to District hydrologic boundaries. In those cases where a region...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  9. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1987-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  10. Simplifying the construction of domain-specific automatic programming systems: The NASA automated software development workstation project

    NASA Technical Reports Server (NTRS)

    Allen, Bradley P.; Holtzman, Peter L.

    1988-01-01

    An overview is presented of the Automated Software Development Workstation Project, an effort to explore knowledge-based approaches to increasing software productivity. The project focuses on applying the concept of domain specific automatic programming systems (D-SAPSs) to application domains at NASA's Johnson Space Flight Center. A version of a D-SAPS developed in Phase 1 of the project for the domain of space station momentum management is described. How problems encountered during its implementation led researchers to concentrate on simplifying the process of building and extending such systems is discussed. Researchers propose to do this by attacking three observed bottlenecks in the D-SAPS development process through the increased automation of the acquisition of programming knowledge and the use of an object oriented development methodology at all stages of the program design. How these ideas are being implemented in the Bauhaus, a prototype workstation for D-SAPS development is discussed.

  11. NASA Work Breakdown Structure (WBS) Handbook

    NASA Technical Reports Server (NTRS)

    Terrell, Stefanie M.

    2018-01-01

    The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements.

  12. Synchronization of construction, replenishment and leasing cycles with account of wave dynamics of innovation cycles in the construction and transport field

    NASA Astrophysics Data System (ADS)

    Alekseeva, Tatyana

    2017-10-01

    The article considers the contradictive nature of the basic cycles of the growth in construction, the core of which are construction cycles, replenishment cycles of the active part of fixed assets, innovation and investment cycles. All of the listed cycles objectively thwart the science and technology progress in construction. There are presented results of the study of finance leasing as an effective tool, that provides time reduction of the innovation replenishment cycle of the active part of fixed assets in construction. It takes into account the development and implementation terms of construction investment projects in order to timely support the innovation wave and enhance its efficiency in construction for a rapid transition of the construction investment complex and national economy to a new vector of growth.

  13. EST databases and web tools for EST projects.

    PubMed

    Shen, Yao-Qing; O'Brien, Emmet; Koski, Liisa; Lang, B Franz; Burger, Gertraud

    2009-01-01

    This chapter outlines key considerations for constructing and implementing an EST database. Instead of showing the technological details step by step, emphasis is put on the design of an EST database suited to the specific needs of EST projects and how to choose the most suitable tools. Using TBestDB as an example, we illustrate the essential factors to be considered for database construction and the steps for data population and annotation. This process employs technologies such as PostgreSQL, Perl, and PHP to build the database and interface, and tools such as AutoFACT for data processing and annotation. We discuss these in comparison to other available technologies and tools, and explain the reasons for our choices.

  14. Modelling of project cash flow on construction projects in Malang city

    NASA Astrophysics Data System (ADS)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  15. Remote sensing in Michigan for land resource management

    NASA Technical Reports Server (NTRS)

    Sattinger, I. J.

    1972-01-01

    This project to demonstrate the application of earth resource survey technology to current problems in Michigan was undertaken jointly by the Environmental Research Institute of Michigan and Michigan State University. Remote sensing techniques were employed to advantage in providing management information for the Pointe Mouillee State Game Area and preparing an impact assessment in advance of the projected construction of the M-14 freeway from Ann Arbor to Plymouth, Michigan. The project also assisted the state government in its current effort to develop and implement a state-wide land management plan.

  16. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    PubMed

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  17. Socioecological Aspects of High-rise Construction

    NASA Astrophysics Data System (ADS)

    Eichner, Michael; Ivanova, Zinaida

    2018-03-01

    In this article, the authors consider the socioecological problems that arise in the construction and operation of high-rise buildings. They study different points of view on high-rise construction and note that the approaches to this problem are very different. They also analyse projects of modern architects and which attempts are made to overcome negative impacts on nature and mankind. The article contains materials of sociological research, confirming the ambivalent attitude of urban population to high-rise buildings. In addition, one of the author's sociological survey reveals the level of environmental preparedness of the university students, studying in the field of "Construction of unique buildings and structures", raising the question of how future specialists are ready to take into account socioecological problems. Conclusion of the authors: the construction of high-rise buildings is associated with huge social and environmental risks, negative impact on the biosphere and human health. This requires deepened skills about sustainable design methods and environmental friendly construction technologies of future specialists. Professor M. Eichner presents in the article his case study project results on implementation of holistic eco-sustainable construction principles for mixed-use high-rise building in the metropolis of Cairo.

  18. Network models for solving the problem of multicriterial adaptive optimization of investment projects control with several acceptable technologies

    NASA Astrophysics Data System (ADS)

    Shorikov, A. F.; Butsenko, E. V.

    2017-10-01

    This paper discusses the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. On the basis of network modeling proposed a new economic and mathematical model and a method for solving the problem of multicriterial adaptive optimization the control of investment projects in the presence of several technologies. Network economic and mathematical modeling allows you to determine the optimal time and calendar schedule for the implementation of the investment project and serves as an instrument to increase the economic potential and competitiveness of the enterprise. On a meaningful practical example, the processes of forming network models are shown, including the definition of the sequence of actions of a particular investment projecting process, the network-based work schedules are constructed. The calculation of the parameters of network models is carried out. Optimal (critical) paths have been formed and the optimal time for implementing the chosen technologies of the investment project has been calculated. It also shows the selection of the optimal technology from a set of possible technologies for project implementation, taking into account the time and cost of the work. The proposed model and method for solving the problem of managing investment projects can serve as a basis for the development, creation and application of appropriate computer information systems to support the adoption of managerial decisions by business people.

  19. CONSULT-I Reading. Cincinnati Project. Final Report.

    ERIC Educational Resources Information Center

    Newman, Anabel; And Others

    A study examined the effectiveness of the spring-semester 1993 implementation of the CONSULT-I(R) program, which uses artificial intelligence with statistical pattern recognition in constructing a diagnosis and recommending treatment of reading difficulties. Eight classroom teachers and two Gifted and Talented coordinators at South Avondale…

  20. The Development of a "Neighborhood in Solidarity" in Switzerland.

    PubMed

    Zwygart, Marion; Plattet, Alain; Ammor, Sarah

    2017-01-01

    This article presents a case study based on the "Neighborhood in Solidarity" (NS) methodology to illustrate its application in a locality of 8,000 inhabitants in Switzerland. This specific project is proposed to exemplify the global aim of the NS methodology. That aim is to increase the integration of elderly persons in societies in order to improve their quality of life. The case study demonstrates the enhancement of the capacity of the older people to remain actively engaged in their neighborhood. The article focuses on the creation of an autonomous community of empowered older people who can resolve their own problems after a 5-year project. The construction of the local community is presented throughout the six steps of the methodology: (1) preliminary analysis, (2) diagnostic, (3) construction, (4) project design, (5) project implementation, and (6) empowerment and with three degrees of involvement (community, participative, and integrative involvement). Performance and output indicators, quality indicators, and social determinants of health assess the development of the local project. The impacts of the projects which are illustrated in this specific example motivated this publication to inspire practitioners from other countries.

  1. Risk assessment for construction projects of transport infrastructure objects

    NASA Astrophysics Data System (ADS)

    Titarenko, Boris

    2017-10-01

    The paper analyzes and compares different methods of risk assessment for construction projects of transport objects. The management of such type of projects demands application of special probabilistic methods due to large level of uncertainty of their implementation. Risk management in the projects requires the use of probabilistic and statistical methods. The aim of the work is to develop a methodology for using traditional methods in combination with robust methods that allow obtaining reliable risk assessments in projects. The robust approach is based on the principle of maximum likelihood and in assessing the risk allows the researcher to obtain reliable results in situations of great uncertainty. The application of robust procedures allows to carry out a quantitative assessment of the main risk indicators of projects when solving the tasks of managing innovation-investment projects. Calculation of damage from the onset of a risky event is possible by any competent specialist. And an assessment of the probability of occurrence of a risky event requires the involvement of special probabilistic methods based on the proposed robust approaches. Practice shows the effectiveness and reliability of results. The methodology developed in the article can be used to create information technologies and their application in automated control systems for complex projects.

  2. Ecological control line: A decade of exploration and an innovative path of ecological land management for megacities in China.

    PubMed

    Hong, Wuyang; Yang, Chengyun; Chen, Liuxin; Zhang, Fangfang; Shen, Shaoqing; Guo, Renzhong

    2017-04-15

    Ecological control line is a system innovation in the field of ecological environment protection in China and it has become as an important strategy of national ecological protection. Ten years have passed since the first ecological control line in Shenzhen was delimited in 2005. This study examines the connotations of ecological control line and the current study status in China and abroad, and then takes a brief description about the delimitation background and existing problems of the ecological control line in Shenzhen. The problem-solving strategy is gradually transforming from extensive management to refined management. This study proposes a differential ecological space management model that merges the space system, management system, and support system. The implementation paths include the following five aspects: delimiting ecological bottom lines to protect core ecological resources; formulating access systems for new construction projects to strictly control new construction; implementing construction land inventory reclamation assisted by market means; regulating boundary adjusting procedures and processes; and constructing ecological equity products by using multiple means to implement rights relief. Finally, this study illustrates the progress of the implementation and discusses the rigorousness and flexibility problems of ecological control line and calls for the promotion of the legislation. The management model and implementation paths proposed in this study have referential significance for developing countries and megacities to achieve ecological protection and sustainable development. Copyright © 2017 Elsevier Ltd. All rights reserved.

  3. Applications of building information model (BIM) in Malaysian construction industry

    NASA Astrophysics Data System (ADS)

    Tahir, M. M.; Haron, N. A.; Alias, A. H.; Al-Jumaa, A. T.; Muhammad, I. B.; Harun, A. N.

    2017-12-01

    Since the introduction of BIM in Malaysia in 2009, the technology adoption rate is slow when compared to other countries of the world. Most of the construction companies in Malaysia have an insight on the BIM concept but are yet to implement it in the management of their construction projects. By the year 2020, the Malaysian government will make BIM mandatory, this makes it important to carry out research on the possible applications of the technology. A qualitative method of enquiry was used for this study in Klang Valley using semistructured interview. The responses received were analysed using Principal component analysis (PCA). The result of the analysis showed that “quantity take-off and estimation”, “clash detection and coordination”, “integration and collaboration of stakeholders”, and “design and visualisation” as the main applications of BIM in Malaysia presently. The implication of this findings is that the Malaysian construction industry productivity is likely to increase to meet the demand of the population through the implementations of BIM. More also, BIM technology is regarded as the future of construction industry, which makes it very important for the industry.

  4. Synthetic building materials for transport buildings and structures

    NASA Astrophysics Data System (ADS)

    Gerasimova, Vera

    2017-10-01

    The most effective building materials account for the highest growth not only in construction of residential and public buildings, but also other capital projects including roadways, bridges, drainage, communications and other engineering projects. Advancement in the technology of more efficient and ecologically responsible insulation materials have been a priority for safety, minimal maintenance and longevity of finished construction projects. The practical use of modern building materials such as insulation, sound reduction and low energy consumption are a benefit in cost and application compared to the use of outdated heavier and labor-intensive materials. The most efficient way for maximizing insolation and sound proofing should be done during the design stages of the project according to existing codes and regulations that are required by Western Government. All methods and materials that are used need to be optimized in order to reach a high durability and low operational and maintenance cost exceeding more than 50 years of the life of the building, whether it is for public, industrial or residential use. Western construction techniques and technologies need to be applied and adapted by the Russian Federation to insure the most productive successful methods are being implemented. The issues of efficient insulation materials are outlined in this article.

  5. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    NASA Astrophysics Data System (ADS)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  6. Standards for tire-bale erosion control and bank stabilization projects: validation of existing practice and implementation.

    DOT National Transportation Integrated Search

    2010-09-01

    In an effort to promote the use of increasing stockpiles of waste tires and a growing demand for adequate : backfill material in highway construction, NMDOT has embarked on a move to use compressed tire-bales : as a means to reduce cost of constructi...

  7. General Physics as a Major

    ERIC Educational Resources Information Center

    Peckham, Donald C.; Romer, Alfred

    1976-01-01

    A three-year general physics program which uses a single text from which a sequence of one-year courses have been constructed is described. It is organized on a modified spiral approach and requires laboratory work culminating in an experimental project during the sixth semester. Discussion includes implementation and administration of the…

  8. First-Year Hands-On Design Course: Implementation & Reception

    ERIC Educational Resources Information Center

    Butterfield, Anthony E.; Branch, Kyle; Trujillo, Edward

    2015-01-01

    To incorporate active and collaborative teaching methods early in our curriculum, we have developed a freshman design laboratory. The course introduces numerous core concepts and lab skills, by way of seven teaching modules, including spectrometer construction and a collaborative project with seniors. Survey data show students enjoyed and learned…

  9. CONSULT-I Reading South Avondale Elementary School Cincinnati Project. Final Report.

    ERIC Educational Resources Information Center

    Newman, Anabel; And Others

    A study examined the effectiveness of the third year of implementation of the CONSULT-I program, which uses artificial intelligence with statistical pattern recognition in constructing a diagnosis and recommending treatment of reading difficulties. Six elementary classroom teachers at South Avondale Elementary School in Cincinnati, Ohio,…

  10. CONSULT-I Reading. South Avondale Elementary School, Cincinnati Project. Final Report.

    ERIC Educational Resources Information Center

    Newman, Anabel; And Others

    A study examined the effectiveness of the second year of implementation of the CONSULT-I program, which uses artificial intelligence with statistical pattern recognition in constructing a diagnosis and recommending treatment of reading difficulties. Five elementary classroom teachers, two ESEA (Elementary and Secondary Education Act) teachers, and…

  11. CONSULT-I Reading. Ohio Project. Final Report.

    ERIC Educational Resources Information Center

    Newman, Anabel; And Others

    A study examined the effectiveness of the 1991-1992 implementation of the CONSULT-I(R) program (which uses artificial intelligence with statistical pattern recognition in constructing a diagnosis and recommending treatment of reading difficulties) at five cities in Ohio (Akron, Cincinnati, Cleveland, Columbus, and Toledo). A total of 30 teachers…

  12. 49 CFR 262.13 - Matching requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION IMPLEMENTATION OF PROGRAM FOR CAPITAL GRANTS FOR RAIL LINE RELOCATION AND... least ten percent of the construction costs of a project that is funded in part by the grant awarded... the State or other non-Federal entity or allowable costs, calculated on the basis of costs incurred by...

  13. Building Information Modeling (BIM) Roadmap: Supplement 2 - BIM Implementation Plan for Military Construction Projects, Bentley Platform

    DTIC Science & Technology

    2011-01-01

    ER D C TR -0 6- 10 , S up pl em en t 2 Building Information Modeling ( BIM ) Roadmap Supplement 2 – BIM Implementation Plan for Military...release; distribution is unlimited. ERDC TR-06-10, Supplement 2 January 2011 Building Information Modeling ( BIM ) Roadmap Supplement 2 – BIM ...ERDC TR-06-10, Supplement 2 (January 2011) 2 Abstract: Building Information Modeling ( BIM ) technology provides the communities of practice in

  14. Removing Dams: Project-Level Policy and Scientific Research Needs (Invited)

    NASA Astrophysics Data System (ADS)

    Graber, B.

    2010-12-01

    More than 800 dams have been removed around the country, mostly “small” dams, under 25 feet in height. The total number of removals, however, is small relative to the number of deteriorating dams and the ecological impacts those structures continue to have on native riverine species and natural river function. The number of dam removal projects is increasing as aging dams continue to deteriorate and riverine species continue to decline. Practitioners and regulators need to find cost-effective project approaches that minimize short-term environmental impacts and maximize long-term benefits while keeping project costs manageable. Dam removals can be a regulatory challenge because they inherently have short-term impacts in order to achieve larger, self-sustaining, long-term benefits. These short-term impacts include sediment movement, construction access roads, and habitat conversion from lacustrine to riverine. Environmental regulations are designed to prevent degradation and have presented challenges for projects designed to benefit the environment. For example, a short-term release of sediment may exceed water quality standards for some period of time, but lead to a long-term beneficial project. Other regulatory challenges include permitting the loss of wetland area for increased native river function, or allowing the release of some level of contaminated sediment when the downstream sediment is similarly contaminated. Dam removal projects raise a range of engineering and scientific questions on effective implementation techniques such as appropriate sediment management approaches, construction equipment access approaches, invasive species management, channel/floodplain reconstruction, and active versus passive habitat rehabilitation. While practitioners have learned and refined implementation approaches over the last decade, more input is needed from researchers to help assess the effectiveness of those techniques, and to provide more effective techniques. Applied research is needed to provide management tools for practitioners on questions such as: How do we determine the quantity of sediment that is acceptable to release downstream without causing long-term harm to habitat? How can we estimate how much sediment rivers naturally carry in places where there are no sediment gauges? Will the release of coarse-grain sediment help build habitat structure downstream or will it smother habitat? What is the trajectory of habitat quality in an impoundment wetland and is it justifiable to use self-sustainability as an argument to allow a reduction in wetland area for native river habitat? Will having construction equipment working in the flowing river channel do less harm than dewatering a river channel for a longer period of time? American Rivers staff have collectively had an active involvement in more than one hundred dam removal projects. In this presentation, an American Rivers geomorphologist will pose the questions that need to be answered to reduce project-level policy challenges and allow the implementation of cost-effective dam removal projects.

  15. Beyond the classroom: a case study of immigrant safety liaisons in residential construction.

    PubMed

    Ochsner, Michele; Marshall, Elizabeth G; Martino, Carmen; Pabelón, Marién Casillas; Kimmel, Louis; Rostran, Damaris

    2012-01-01

    Latino day laborers often work at dangerous construction sites with little power to change conditions. We describe the development, implementation, and early-stage results of a program to train immigrant day laborers as safety liaisons. These are construction workers prepared to recognize and respond to health and safety hazards. Based in Newark, NJ, the project involves collaboration between New Labor, a membership-based worker center, and university researchers and labor educators. Safety liaisons undergo training and receive ongoing support for their roles. Both qualitative and quantitative data are collected to monitor progress. Although lacking in formal authority, safety liaisons have prompted improvements at specific sites, filed OSHA complaints, and developed a local worker council. Participatory training methods, opportunities for leadership outside the classroom, and participation in project planning have strengthened liaisons' effectiveness, leadership skills, and commitment. The safety liaison approach could be adapted by worker centers and their partner organizations.

  16. Port Granby Project Overview - 13208

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, David W.; Vandergaast, Gary; Sungaila, Mark

    2013-07-01

    The Port Granby Project is an integral part of the Port Hope Area Initiative (PHAI), and is located approximately 14 kilometres west of the Municipality of Port Hope in the adjacent Municipality of Clarington, Ontario. The principal objective of the project is the excavation and relocation of low-level radioactive waste (LLRW) and marginally contaminated soils, which were deposited at the Port Granby Waste Management Facility (PGWMF) by Eldorado Nuclear Limited during the period 1955 to 1988, to a new, highly engineered above-ground Long-term Waste Management Facility (LTWMF) to be constructed on a nearby site. The Environmental Assessment for the Projectmore » was approved in 2009 August and the required Waste Nuclear Substance License was received in 2011 November. Once the detailed engineering design was completed, in 2011 March, the Port Granby Project was divided into three major contracts for construction implementation purposes. The first of these contracts was completed in late 2012 and the second is planned to start in early 2013. The contracting process for the third major contract is also expected to be completed during 2013. This paper provides an overview of the Port Granby Project as well as discussion on the status of the Project, including the regulatory approvals process, the approach to contracting the construction works and an update of work recently completed and soon to get underway. (authors)« less

  17. Liabilities and Responsibilities of the Construction Manager for Implementation and Management of the Safety Program.

    DTIC Science & Technology

    1987-12-01

    acting as an agent of the owner, and the owner contracts directly with several prime or trade contractors. There are four different agreements associated...safety precautions and programs in connection with the project or for the construction manager’s obligations as the agent of the owner. AIA A201/CM...require the general contractor to exercise reasonable care for safety of the subcontractor’s employees. Owners and their agents must be careful that

  18. Participatory Training to Improve Safety and Health in Small Construction Sites in Some Countries in Asia: Development and Application of the WISCON Training Program.

    PubMed

    Kawakami, Tsuyoshi

    2016-08-01

    A participatory training program, Work Improvement in Small Construction Sites, was developed to provide practical support measures to the small construction sector. Managers and workers from selected small sites were interviewed about their occupational safety and health risks. The Work Improvement in Small Construction Sites training program comprised a 45-item action checklist, photos, and illustrations showing local examples and group work methods. Pilot training workshops were carried out with workers and employers in Cambodia, Laos, Mongolia, Thailand, and Vietnam. Participants subsequently planned, and using locally available low-cost materials, implemented their own improvements such as hand-made hand trucks to carry heavy materials, removal of projecting nails from timber materials, and fences to protect roof workers from falling. Local Work Improvement in Small Construction Sites trainers consisting of government officials, workers, employers, and nongovernment organization representatives were then trained to implement the Work Improvement in Small Construction Sites training widely. Keys to success were easy-to-apply training tools aiming at immediate, low-cost improvements, and collaboration with various local people's networks. © The Author(s) 2016.

  19. The Caltech Concurrent Computation Program - Project description

    NASA Technical Reports Server (NTRS)

    Fox, G.; Otto, S.; Lyzenga, G.; Rogstad, D.

    1985-01-01

    The Caltech Concurrent Computation Program wwhich studies basic issues in computational science is described. The research builds on initial work where novel concurrent hardware, the necessary systems software to use it and twenty significant scientific implementations running on the initial 32, 64, and 128 node hypercube machines have been constructed. A major goal of the program will be to extend this work into new disciplines and more complex algorithms including general packages that decompose arbitrary problems in major application areas. New high-performance concurrent processors with up to 1024-nodes, over a gigabyte of memory and multigigaflop performance are being constructed. The implementations cover a wide range of problems in areas such as high energy and astrophysics, condensed matter, chemical reactions, plasma physics, applied mathematics, geophysics, simulation, CAD for VLSI, graphics and image processing. The products of the research program include the concurrent algorithms, hardware, systems software, and complete program implementations.

  20. Computer Administering of the Psychological Investigations: Set-Relational Representation

    NASA Astrophysics Data System (ADS)

    Yordzhev, Krasimir

    Computer administering of a psychological investigation is the computer representation of the entire procedure of psychological assessments - test construction, test implementation, results evaluation, storage and maintenance of the developed database, its statistical processing, analysis and interpretation. A mathematical description of psychological assessment with the aid of personality tests is discussed in this article. The set theory and the relational algebra are used in this description. A relational model of data, needed to design a computer system for automation of certain psychological assessments is given. Some finite sets and relation on them, which are necessary for creating a personality psychological test, are described. The described model could be used to develop real software for computer administering of any psychological test and there is full automation of the whole process: test construction, test implementation, result evaluation, storage of the developed database, statistical implementation, analysis and interpretation. A software project for computer administering personality psychological tests is suggested.

  1. The application of the unmanned aerial vehicle remote sensing technology in the FAST project construction

    NASA Astrophysics Data System (ADS)

    Zhu, Boqin

    2015-08-01

    The purpose of using unmanned aerial vehicle (UAV) remote sensing application in Five-hundred-meter aperture spherical telescope (FAST) project is to dynamically record the construction process with high resolution image, monitor the environmental impact, and provide services for local environmental protection and the reserve immigrants. This paper introduces the use of UAV remote sensing system and the course design and implementation for the FAST site. Through the analysis of the time series data, we found that: (1) since the year 2012, the project has been widely carried out; (2) till 2013, the internal project begun to take shape;(3) engineering excavation scope was kept stable in 2014, and the initial scale of the FAST engineering construction has emerged as in the meantime, the vegetation recovery went well on the bare soil area; (4) in 2015, none environmental problems caused by engineering construction and other engineering geological disaster were found in the work area through the image interpretation of UAV images. This paper also suggested that the UAV technology need some improvements to fulfill the requirements of surveying and mapping specification., including a new data acquisition and processing measures assigned with the background of highly diverse elevation, usage of telephoto camera, hierarchical photography with different flying height, and adjustment with terrain using the joint empty three settlement method.

  2. Walla Walla River Fish Passage Operations Program, 2000-2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, Brian C.; Duke, Bill B.

    2004-02-01

    In the late 1990's, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate migration conditions in the basin. The migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow measures, and initiating trap and haul efforts. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adultmore » and juvenile salmonids in the basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage criteria and passage and trapping facility design and operation. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. During the 2000-2001 project year, there were 624 summer steelhead (Oncorhynchus mykiss), 24 bull trout (Salvelinus confluentus), and 47 spring chinook (O. tshawytscha) counted at the Nursery Bridge Dam adult trap between December 27, 2000 and June 7, 2001. The Little Walla Walla River juvenile trap was not operated this year. The project transported 1600 adult spring chinook from Ringold Springs Hatchery to the South Fork Walla Walla Brood Holding Facility and outplanted 1156 for natural spawning in the basin. The project also provided equipment for transportation of juveniles captured during the construction fish salvage at Nursery Bridge Dam.« less

  3. Harnessing the power of enhanced data for healthcare quality improvement: lessons from a Minnesota Hospital Association Pilot Project.

    PubMed

    Pine, Michael; Sonneborn, Mark; Schindler, Joe; Stanek, Michael; Maeda, Jared Lane; Hanlon, Carrie

    2012-01-01

    The imperative to achieve quality improvement and cost-containment goals is driving healthcare organizations to make better use of existing health information. One strategy, the construction of hybrid data sets combining clinical and administrative data, has strong potential to improve the cost-effectiveness of hospital quality reporting processes, improve the accuracy of quality measures and rankings, and strengthen data systems. Through a two-year contract with the Agency for Healthcare Research and Quality, the Minnesota Hospital Association launched a pilot project in 2007 to link hospital clinical information to administrative data. Despite some initial challenges, this project was successful. Results showed that the use of hybrid data allowed for more accurate comparisons of risk-adjusted mortality and risk-adjusted complications across Minnesota hospitals. These increases in accuracy represent an important step toward targeting quality improvement efforts in Minnesota and provide important lessons that are being leveraged through ongoing projects to construct additional enhanced data sets. We explore the implementation challenges experienced during the Minnesota Pilot Project and their implications for hospitals pursuing similar data-enhancement projects. We also highlight the key lessons learned from the pilot project's success.

  4. Critical Elements for Successful Implementation and Adoption of Authentic Scientific Research Programs: Lessons Learned from NASA's Mars Student Imaging Project

    NASA Astrophysics Data System (ADS)

    Klug Boonstra, S.; Swann, J.; Boonstra, D.; Manfredi, L.; Christensen, P. R.

    2016-12-01

    Recent research identifies the most effective learning as active, engaged learning in which students interact with phenomena, other students, and the teacher/leader to derive meaning and construct understanding of their surroundings. "Similarly, an engaging and effective science education goes well beyond the low-level factual recall that is emphasized in many science classes. It must develop the skills that students need to solve complex problems, work in teams, make and recognize evidence-based arguments, and interpret and communicate complex information" (emphasis added). Authentic science research projects provide active, engaged learning in which students interact with authentic science data in an authentic problem-solving context to derive meaning and construct understanding of the world. In formal (and many informal) settings, the teacher/leader is effectively the gatekeeper who determines the learning experiences in which the students will participate. From our experience of nearly a decade and a half of authentic science programming for 5thgrade through early college students working with NASA Mars data, supporting and enabling the teacher is perhaps the most critical and foundational element for designing a successful authentic research experience. Yet, a major barrier to this type of learning are teacher/leaders who are too often not equipped or who lack confidence to succeed in facilitating authentic research projects. The Mars Student Imaging Project has implemented an iterative process of design, testing, and redesign that has identified and implemented critical teacher/leader-enabling elements that have led to increasingly successful adoptions within formal and informal educational settings - allowing more students to gain the benefits of immersive research experience.

  5. Investigating factors influencing construction waste management efforts in developing countries: an experience from Thailand.

    PubMed

    Manowong, Ektewan

    2012-01-01

    Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.

  6. Evaluation protocol to assess an integrated framework for the implementation of the Childhood Obesity Research Demonstration project at the California (CA-CORD) and Massachusetts (MA-CORD) sites.

    PubMed

    Chuang, Emmeline; Ayala, Guadalupe X; Schmied, Emily; Ganter, Claudia; Gittelsohn, Joel; Davison, Kirsten K

    2015-02-01

    The long-term success of child obesity prevention and control efforts depends not only on the efficacy of the approaches selected, but also on the strategies through which they are implemented and sustained. This study introduces the Multilevel Implementation Framework (MIF), a conceptual model of factors affecting the implementation of multilevel, multisector interventions, and describes its application to the evaluation of two of three state sites (CA and MA) participating in the Childhood Obesity Research Demonstration (CORD) project. A convergent mixed-methods design is used to document intervention activities and identify determinants of implementation effectiveness at the CA-CORD and MA-CORD sites. Data will be collected from multiple sectors and at multiple levels of influence (e.g., delivery system, academic-community partnership, and coalition). Quantitative surveys will be administered to coalition members and staff in participating delivery systems. Qualitative, semistructured interviews will be conducted with project leaders and key informants at multiple levels (e.g., leaders and frontline staff) within each delivery system. Document analysis of project-related materials and in vivo observations of training sessions will occur on an ongoing basis. Specific constructs assessed will be informed by the MIF. Results will be shared with project leaders and key stakeholders for the purposes of improving processes and informing sustainability discussions and will be used to test and refine the MIF. Study findings will contribute to knowledge about how to coordinate and implement change strategies within and across sectors in ways that effectively engage diverse stakeholders, minimize policy resistance, and maximize desired intervention outcomes.

  7. How to renovate a 50-year-old wastewater treating plant: Part 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunter, M.L.

    1996-01-01

    How does an existing refinery cost-effectively renovate wastewater/stormwater treating systems to meet today`s environmental regulations and standards? Faced with solving this problem, Amoco`s Whiting Refinery developed a project team consisting of plant and operations engineers, corporate project and design engineers, contractors and vendors to map out a strategy to re-engineer the existing wastewater treating plant (WWTP) and auxiliary functions. This case history shows how an old refinery limited by existing equipment, building space, operation`s availability requirements and costs divided the project into several design phases. The design team used a proactive approach with empowerment responsibilities to solve construction, equipment usagemore » and regulatory problems throughout the project`s lifetime. Focusing on front-end planning and customer service (the refinery), team members applied value-based engineering designs to keep costs down, implemented safe work practices during construction, used HAZOP reviews to scrutinize proposed designs for operating and maintenance procedures, etc. The result has been the renovation of a 50-year-old WWTP completed under budget, ontime and in compliance with federal mandates.« less

  8. Environmental Impact Analysis Process. Preliminary Draft Environmental Impact Statement. Construction and Operation of Space Launch Complex 7. Volume 2. Appendices.

    DTIC Science & Technology

    1989-03-15

    non -point source pollution managementprograms, and implement controls to improve water quality. Controls should be implemented for any project...Businesses or other for- Vandenberg AFB, and the launching of on the proposed information collection profit, non -profit institutions Ithe Titan Centaur. In...communications. The Titan Centaur launch vehicle is a modified Titan 34D designed to deliver a payload of up to U 32,000 pounds directly into polar orbit from VAFB

  9. Managing environmental issues during international electric power project development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cooper, H.W.

    1998-07-01

    Responsible international project developers most often view environmental matters with quite mixed emotions. Those with whom Dynalytics has worked would certainly never contemplate jeopardizing the health of anyone in the world. But while they want their projects realized, and are willing to implement reasonable requirements, they are often asked to do more than is appropriate, more than is technologically possible, and more than is financially possible. The paper discusses the following: who is in charge of environmental matters; whose environmental standards apply; the role of technology; accelerating timetables and reducing costs; documentation and applications; and post-construction requirements.

  10. Criteria for classification of competitive housing projects in terms of their environmental friendliness

    NASA Astrophysics Data System (ADS)

    Nezhnikova, Ekaterina

    2017-10-01

    This article deals with social and economic essence of strategy of the housing industry development, both complex system of economic relations in field of production and consumption, which is regulated through the mechanism of prices and implemented through formation and realization of priority directions. Developed criteria for classification of housing construction projects as environmentally friendly and the quality criteria of variables for assessment of the environmental friendliness of residential buildings allowed to determine the ways of development of the industry on the basis of creation of competitive projects in interrelation with quality, environmental friendliness and price of consumption.

  11. Learning autonomy in writing class: Implementation of project-based learning in english for spesific purposes

    NASA Astrophysics Data System (ADS)

    Ayu Sukerti, G. N.; Yuliantini, Ny

    2018-01-01

    This research was aimed to analyze students’ attitude on learning autonomy through the implementation of project-based learning (PBL). Writing has been considered one of the most difficult competencies to master as it incorporates several integrated language skills. Thus, teaching writing in English for Specific Class posts a huge challenge as students often feel discouraged by the complex series of processes involved in producing a well-structured piece of writing. This research implemented PBL as the learning model to boost students’ learning outcomes and construct self-directed learning. Participants were 25 second semester students enrolled in a three-year undergraduate program in Informatics Management. The implementation of PBL in writing class contributed real advantages since it allowed students to collaboratively arrange outline in order to produce individual drafts and final essays. The study revealed that students were able to be involved in a more deep and autonomous learning as they helped each other during group discussion. The students autonomously engaged in the completion of the project in a more positive attitude. They also acquired more knowledge in the aspect of grammar and learned how to use language in proper context based on the feedbacks they got during revising their writing.

  12. Advantages and difficulties of implementation of flat-panel multimedia monitoring system in a surgical MRI suite

    NASA Astrophysics Data System (ADS)

    Deckard, Michael; Ratib, Osman M.; Rubino, Gregory

    2002-05-01

    Our project was to design and implement a ceiling-mounted multi monitor display unit for use in a high-field MRI surgical suite. The system is designed to simultaneously display images/data from four different digital and/or analog sources with: minimal interference from the adjacent high magnetic field, minimal signal-to-noise/artifact contribution to the MRI images and compliance with codes and regulations for the sterile neuro-surgical environment. Provisions were also made to accommodate the importing and exporting of video information via PACS and remote processing/display for clinical and education uses. Commercial fiber optic receivers/transmitters were implemented along with supporting video processing and distribution equipment to solve the video communication problem. A new generation of high-resolution color flat panel displays was selected for the project. A custom-made monitor mount and in-suite electronics enclosure was designed and constructed at UCLA. Difficulties with implementing an isolated AC power system are discussed and a work-around solution presented.

  13. Risk assessment of underpass infrastructure project based on IS0 31000 and ISO 21500 using fishbone diagram and RFMEA (project risk failure mode and effects analysis) method

    NASA Astrophysics Data System (ADS)

    Purwanggono, Bambang; Margarette, Anastasia

    2017-12-01

    Completion time of highway construction is very meaningful for smooth transportation, moreover expected number of ownership motor vehicle will increase each year. Therefore, this study was conducted with to analyze the constraints that contained in an infrastructure development project. This research was conducted on Jatingaleh Underpass Project, Semarang. This research was carried out while the project is running, on the implementation, this project is experiencing delays. This research is done to find out what are the constraints that occur in execution of a road infrastructure project, in particular that causes delays. The method that used to find the root cause is fishbone diagram to obtain a possible means of mitigation. Coupled with the RFMEA method used to determine the critical risks that must be addressed immediately on road infrastructure project. The result of data tabulation in this study indicates that the most possible mitigation tool to make a Standard Operating Procedure (SOP) recommendations to disrupt utilities that interfere project implementation. Process of risk assessment has been carried out systematically based on ISO 31000:2009 on risk management and for determination of delayed variables, the requirements of process groups according to ISO 21500:2013 on project management were used.

  14. The Role of CMR and Others in Project Implementation using the CM Method to Support the Government

    NASA Astrophysics Data System (ADS)

    Tada, Hiroshi; Miyatake, Ichiro; Mouri, Junji; Endo, Kenji; Fueta, Toshiharu

    In Japan, the construction management (CM) method has been introduced as a measure to support the governmental agencies, in developing and maintaining local infrastructures, or in executing public works projects in an appropriate manner, etc. The scope of work of the Construction Manager (CMR) of the CM method is specified as work items, in the special specification document for CM services contained in the contract documents, as a reflection of the client's expectations towards the performance of CMR. However, the CM services has been conducted as required on a case-by-case basis, because it is not possible to anticipate the actual construction status in advance, and thus the special specification document does not provide full detail of the scope of work of CMR. In such case, there may be a difference in the way the scope of work in the special specification document is recognized between the client and the CMR, which could make the CM method less effective. Moreover, there is a case in which the role sharing between the client and the CMR is not clearly defined, and both parties may engage in the same task in such case, causing an obstacle for smooth project implementation. For this reason, it is required to prepare the special specification document which clearly defines the scope of work of CMR, by examining the status of application of the CM method in actual project cases, and to improve the practices of the CM method as necessary. In view of this background, this study looks in to the actual project cases using the CM method, for the purpose of clarifying the actual scope of work of CMR for each task item defined in the special specification document, and the role sharing between the client and CMR, in the aim of contributing the promotion of the use and the effective application of the CM method.

  15. 76 FR 2294 - Revision to the South Coast Portion of the California State Implementation Plan, CPV Sentinel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... precursors, sulfur oxides (SO X ), to the CPV Sentinel Energy Project. The District's SIP approved NSR... Management District shall transfer sulfur oxides and particulate emission credits from the CPV Sentinel... needed to issue permits to construct and to meet requirements for sulfur oxides and particulate matter...

  16. Resesrvoir sedimentation rates in the Little Washita River experimental watershed, Oklahoma

    USDA-ARS?s Scientific Manuscript database

    The Washita River Basin (WRB) was one of eleven pilot watershed projects selected for construction of flood control reservoirs around the country as a result of the Flood Control Act of 1936. These reservoirs were implemented to prevent and manage soil erosion and flooding. A total of 45 reservoirs ...

  17. Implementing Constructivist Approach into Online Course Designs in Distance Education Institute at Eastern Mediterranean University

    ERIC Educational Resources Information Center

    Gazi, Zehra A.

    2009-01-01

    Change and development in work settings for better working practice through projects has become essential. And, in this context, learning through working practice is constructed by participatory action research. This work-based research has a significant role to contribute innovative practice of Distance Education Institute at Eastern…

  18. Feedback and Feed-Forward for Promoting Problem-Based Learning in Online Learning Environments

    ERIC Educational Resources Information Center

    Webb, Ashley; Moallem, Mahnaz

    2016-01-01

    Purpose: The study aimed to (1) review the literature to construct conceptual models that could guide instructional designers in developing problem/project-based learning environments while applying effective feedback strategies, (2) use the models to design, develop, and implement an online graduate course, and (3) assess the efficiency of the…

  19. The M68HC11 gripper controller electronics

    NASA Technical Reports Server (NTRS)

    Kelley, Robert B.; Bethel, Jeffrey

    1991-01-01

    This document describes the instrumentation, operational theory, circuit implementation, calibration procedures, and general notes for the CIRSSE general purpose pneumatic hand. The mechanical design and the control software are discussed. The circuit design, PCB layout, hand instrumentation, and controller construction described in detail in this document are the result of a senior project.

  20. Students' Collective Knowledge Construction in the Virtual Learning Environment ""ToLigado"--Your School Interactive Newspaper"

    ERIC Educational Resources Information Center

    Passarelli, Brasilina

    2008-01-01

    Introduction: The ToLigado Project--Your School Interactive Newspaper is an interactive virtual learning environment conceived, developed, implemented and supported by researchers at the School of the Future Research Laboratory of the University of Sao Paulo, Brazil. Method: This virtual learning environment aims to motivate trans-disciplinary…

  1. Creating Meaningful Partnerships: Connecting Teaching Candidates with Professional Development Schools through Service Learning

    ERIC Educational Resources Information Center

    Harrison, Lisa; Reiser, Cortney; Hawk, Robin

    2016-01-01

    Through the use of constructed narratives, this article shares the experiences of two preservice teachers and their university professor in implementing service learning projects that took place within their Professional Development School partnerships. Findings suggest that (1) service learning was a valuable instructional strategy to enhance the…

  2. Linking Effective Project Management to Business Strategy in Oil and Gas Industry through Decision-making Processes

    NASA Astrophysics Data System (ADS)

    Adeleke, Adeyinka

    The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to the decision-making process. Some recommendations for future studies were presented based on the need to intensify the importance of the current study and enlarge the body of knowledge regarding decision-making process in oil and gas industry.

  3. U.S. Coastal Flood Damage Reduction Projects: Federal Authorization and Investment Trends

    NASA Astrophysics Data System (ADS)

    Carter, N. T.

    2015-12-01

    The 2015 U.S. Environmental Protection Agency report Climate Change in the United States: Benefits of Global Action estimated the potential cumulative future economic impacts of storm surge and sea-level rise on U.S. coasts during this century at 5 trillion (2014 dollars) if no adaptation measures are implemented. These impacts drop to 0.8 trillion if investments are made in cost-effective adaptations and protections. Awareness of flood risk and its long-term fiscal impact historically has proven insufficient to motivate pre-disaster land use changes and investments in mitigation and protection. While many adaptations and protections fall largely under state and local authority, some stakeholders are interested in federal coastal flood protection projects, including projects by the U.S. Army Corps of Engineers. Since the 1950s, Congress has authorized the Corps to construct specific coastal projects. The broad vision, strategy, and priorities for the federal role in coastal flood damage reduction projects nonetheless remain ill-defined. This research analyzes (1) the authorization and appropriations trends for Corps coastal storm damage reduction projects, and (2) how Corps feasibility studies account for and address coastal flood hazards. Identified trends include: emergency appropriations for storm-damaged areas outstrip annual investments in coastal flood projects; the rate at which projects are congressionally approved for construction outpaces the rate at which construction is funded; and how coastal protection projects are evaluated in Corps feasibility studies shows variation and change in agency practices. These trends have consequences; they affect public and local expectations when projects begin providing protection benefits, and may influence investments in other adaptation measures. These trends also raise questions for policymakers at all levels and for scientists and practitioners interested in coastal flood resilience.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strout, Michelle

    Programming parallel machines is fraught with difficulties: the obfuscation of algorithms due to implementation details such as communication and synchronization, the need for transparency between language constructs and performance, the difficulty of performing program analysis to enable automatic parallelization techniques, and the existence of important "dusty deck" codes. The SAIMI project developed abstractions that enable the orthogonal specification of algorithms and implementation details within the context of existing DOE applications. The main idea is to enable the injection of small programming models such as expressions involving transcendental functions, polyhedral iteration spaces with sparse constraints, and task graphs into full programsmore » through the use of pragmas. These smaller, more restricted programming models enable orthogonal specification of many implementation details such as how to map the computation on to parallel processors, how to schedule the computation, and how to allocation storage for the computation. At the same time, these small programming models enable the expression of the most computationally intense and communication heavy portions in many scientific simulations. The ability to orthogonally manipulate the implementation for such computations will significantly ease performance programming efforts and expose transformation possibilities and parameter to automated approaches such as autotuning. At Colorado State University, the SAIMI project was supported through DOE grant DE-SC3956 from April 2010 through August 2015. The SAIMI project has contributed a number of important results to programming abstractions that enable the orthogonal specification of implementation details in scientific codes. This final report summarizes the research that was funded by the SAIMI project.« less

  5. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less

  6. Assessing corporate project impacts in changeable contexts: A human rights perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salcito, Kendyl, E-mail: kendyl.salcito@unibas.ch; University of Basel, P.O. Box, CH-4003 Basel; NomoGaia, 1900 Wazee Street, Suite 303, Denver, CO 80202

    Project-level impact assessment was originally conceived as a snapshot taken in advance of project implementation, contrasting current conditions with a likely future scenario involving a variety of predicted impacts. Current best practice guidance has encouraged a shift towards longitudinal assessments from the pre-project stage through the implementation and operating phases. Experience and study show, however, that assessment of infrastructure-intensive projects rarely endures past the project's construction phase. Negative consequences for environmental, social and health outcomes have been documented. Such consequences clarify the pressing need for longitudinal assessment in each of these domains, with human rights impact assessment (HRIA) as anmore » umbrella over, and critical augmentation of, environmental, social and health assessments. Project impacts on human rights are more closely linked to political, economic and other factors beyond immediate effects of a company's policy and action throughout the project lifecycle. Delineating these processes requires an adequate framework, with strategies for collecting longitudinal data, protocols that provide core information for impact assessment and guidance for adaptive mitigation strategies as project-related effects change over time. This article presents general principles for the design and implementation of sustained, longitudinal HRIA, based on experience assessing and responding to human rights impact in a uranium mining project in Malawi. The case study demonstrates the value of longitudinal assessment both for limiting corporate risk and improving human welfare. - Graphical abstract: Assessing changes in human rights condition as affected by both project and context, over time. - Highlights: • Corporate capital projects affect human rights in myriad ways. • Ongoing, longitudinal impact assessment techniques are needed. • We present an approach for conducting longitudinal human rights impact assessment. • Our methodology allows distinguishing corporate impacts from contextual changes. • Promptly observing context changes and impacts enables companies to react nimbly.« less

  7. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less

  8. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less

  9. Root causes occurrence of low BIM adoption in Malaysia: System dynamics modelling approach

    NASA Astrophysics Data System (ADS)

    Mamter, Shahela; Aziz, Abdul Rashid Abdul; Zulkepli, Jafri

    2017-11-01

    The global implementation of BIM in the construction field is increasing worldwide. Due to the advantages offered by BIM, its implementation is considered important in the construction projects. Nevertheless, the Construction Industry Transformation Plan has reported that the adoption of Building Information Modelling (BIM) in Malaysia is still low and it is estimated at only 10 percent adoption amongst construction stake players. The barriers influencing the occurrence of low adoption BIM in Malaysia have been studied by some researchers. However, these researchers did not investigate the root causes which might lead to the recurring of the barriers to BIM adoption. Root causes that immediately occurrence of barriers, also known as precipitants or trigger causes. This conceptual paper developed the causal loop diagram (CLD) which presents the relationship between the perceived variables using system dynamic modelling approach. The findings revealed a novelty validated diagrams that design the holistic dynamic relationship on the root causes occurrence of low BIM adoption. Nonetheless, the diagram subject to more empirical testing for its practicability and further refinement upon more results expected to emerge as the research progresses.

  10. The implementation of health promotion in primary and community care: a qualitative analysis of the 'Prescribe Vida Saludable' strategy.

    PubMed

    Martinez, Catalina; Bacigalupe, Gonzalo; Cortada, Josep M; Grandes, Gonzalo; Sanchez, Alvaro; Pombo, Haizea; Bully, Paola

    2017-02-17

    The impact of lifestyle on health is undeniable and effective healthy lifestyle promotion interventions do exist. However, this is not a fundamental part of routine primary care clinical practice. We describe factors that determine changes in performance of primary health care centers involved in piloting the health promotion innovation 'Prescribe Vida Saludable' (PVS) phase II. We engaged four primary health care centers of the Basque Healthcare Service in an action research project aimed at changing preventive health practices. Prescribe Healthy Life (PVS from the Spanish "Prescribe Vida Saludable) is focused on designing, planning, implementing and evaluating innovative programs to promote multiple healthy habits, feasible to be performed in routine primary health care conditions. After 2 years of piloting, centers were categorized as having high, medium, or low implementation effectiveness. We completed qualitative inductive and deductive analysis of five focus groups with the staff of the centers. Themes generated through consensual grounded qualitative analysis were compared between centers to identify the dimensions that explain the variation in actual implementation of PVS, and retrospectively organized and assessed against the Consolidated Framework for Implementation Research (CFIR). Of the 36 CFIR constructs, 11 were directly related to the level of implementation performance: intervention source, evidence strength and quality, adaptability, design quality and packaging, tension for change, learning climate, self-efficacy, planning, champions, executing, and reflecting and evaluating, with -organizational tracking added as a new sub-construct. Additionally, another seven constructs emerged in the participants' discourse but were not related to center performance: relative advantage, complexity, patients' needs and resources, external policy and incentives, structural characteristics, available resources, and formally appointed internal implementation leaders. Our findings indicate that the success of the implementation seems to be associated with the following components: the context, the implementation process, and the collaborative modelling. Identifying barriers and enablers is useful for designing implementation strategies for health promotion in primary health care centers that are essential for innovation success. An implementation model is proposed to highlight the relationships between the CFIR constructs in the context of health promotion in primary care.

  11. Umatilla River Basin Anadromous Fish Habitat Enhancement Project : 2001 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shaw, R. Todd; Sexton, Amy D.

    The Umatilla River Basin Anadromous Fish Habitat Enhancement Project continued to identify impacted stream reaches throughout the Umatilla River Basin for habitat improvements during the 2001 project period. Public outreach efforts, biological and physical monitoring, and continued development of a Umatilla Subbasin Watershed Assessment assisted the project in fostering public cooperation, targeting habitat deficiencies and determining habitat recovery measures. Projects continued to be maintained on 49 private properties, one 25-year Non-Exclusive Bureau of Indian Affairs' Easement was secured, six new projects implemented and two existing project areas improved to enhance anadromous fish habitat. New project locations included sites on themore » mid Umatilla River, upper Umatilla River, Mission Creek, Cottonwood Creek and Buckaroo Creek. New enhancements included: (1) construction of 11,264 feet of fencing between River Mile 43.0 and 46.5 on the Umatilla River, (2) a stream bank stabilization project implemented at approximately River Mile 63.5 Umatilla River to stabilize 330 feet of eroding stream bank and improve instream habitat diversity, included construction of eight root wad revetments and three boulder J-vanes, (3) drilling a 358-foot well for off-stream livestock watering at approximately River Mile 46.0 Umatilla River, (4) installing a 50-foot bottomless arch replacement culvert at approximately River Mile 3.0 Mission Creek, (5) installing a Geoweb stream ford crossing on Mission Creek (6) installing a 22-foot bottomless arch culvert at approximately River Mile 0.5 Cottonwood Creek, and (7) providing fence materials for construction of 21,300 feet of livestock exclusion fencing in the Buckaroo Creek Drainage. An approximate total of 3,800 native willow cuttings and 350 pounds of native grass seed was planted at new upper Umatilla River, Mission Creek and Cottonwood Creek project sites. Habitat improvements implemented at existing project sites included development of a 105-foot well for off-stream livestock watering at approximately River Mile 12.0 Wildhorse Creek and construction of an engineered stream ford at approximately River Mile 3.0 Mission Creek. A total of $277,848 in financial cost share assistance was provided by the Confederated Tribes of the Umatilla Indian Reservation, U.S. Bureau of Indian Affairs, U.S. Environmental Protection Agency, U.S. Department of Agriculture, National Oceanic and Atmospheric Administration, U.S. Workforce Investment Act, Oregon Watershed Enhancement Board, Umatilla County and Pheasants Forever for planning efforts and habitat enhancements. Monitoring continued to quantify baseline conditions and the effects of habitat enhancements in the upper basin. Daily stream temperatures were collected from June through September at 22 sites. Suspended sediment samples were obtained at three gage stations to arrive at daily sediment load estimates. Photographs were taken at 96 existing and three newly established photo points to document habitat recovery and pre-project conditions. Transects were measured at three stream channel cross sections to assist with engineering and design and to obtain baseline data regarding channel morphology. Biological inventories were conducted at River Mile 3.0 Mission Creek to determine pre-project fish utilization above and below the passage barrier. Post-project inventories were also conducted at River Mile 85.0 of the Umatilla River at a project site completed in 1999. Umatilla Subbasin Watershed Assessment efforts were continued under a subcontract with Eco-Pacific. This watershed assessment document and working databases will be completed in fiscal year 2002 and made available to assist project personnel with sub-watershed prioritization of habitat needs. Water Works Consulting, Duck Creek Associates and Ed Salminen Consulting were subcontracted for watershed assessment and restoration planning in the Meacham Creek Subwatershed. A document detailing current conditions in the Meacham Creek Subwatershed and necessary restoration actions will be available for review in 2003.« less

  12. Measure Guideline: Incorporating Thick Layers of Exterior Rigid Insulation on Walls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lstiburek, Joseph; Baker, Peter

    This measure guideline provides information about the design and construction of wall assemblies that use layers of rigid exterior insulation thicker than 1-½ inches and that require a secondary cladding attachment location exterior to the insulation. The guideline is separated into several distinct sections that cover: fundamental building science principles relating to the use of exterior insulation on wall assemblies; design principles for tailoring this use to the specific project goals and requirements; and construction detailing to increase understanding about implementing the various design elements.

  13. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  14. Designing a Site to Embed and to Interact with Wolfram Alpha Widgets in Math and Sciences Courses

    ERIC Educational Resources Information Center

    Cepeda, Francisco Javier Delgado; Acosta, Ruben Dario Santiago

    2014-01-01

    This paper reports design and implementation outcomes at middle development advance of an educative program based on use and construction of widgets on Wolfram Alpha platform at higher education level for engineering and sciences areas. Widgets were based on Physics and Mathematics curricula under Project Oriented Learning and Blended Learning…

  15. Potential difficulties in applying the Pay for Safety Scheme (PFSS) in construction projects.

    PubMed

    Choi, Tracy N Y; Chan, Daniel W M; Chan, Albert P C

    2012-09-01

    Since 1996, the Government of the Hong Kong Special Administrative Region (HKSAR) has introduced the Pay for Safety Scheme (PFSS) to the public works construction contracts to uplift their safety performance. However, the adoption of PFSS has also encountered some difficulties that merit considerable attention. This paper purports to provide a concise review of the prevailing application of PFSS in Hong Kong in general, and to explore the potential difficulties associated with PFSS in particular. By means of an empirical questionnaire survey geared towards industrial practitioners with extensive direct hands-on PFSS experience, their opinions were solicited, analyzed and compared between the client group and contractor group of respondents. The three most significant difficulties in implementing PFSS were found to be: (1) "Plenty of paperwork required for certifying payment to contractor"; (2) "Complicated contract documents and lengthy assessment process"; and (3) "Over-tight project schedule requiring rush jobs". The output of this research study is particularly essential in assisting the contracting parties to mitigate the avoidable hindrances when embarking on PFSS. It has also generated valuable insights into developing effective recommendations for alleviating the barriers to PFSS success for future construction projects. Copyright © 2011 Elsevier Ltd. All rights reserved.

  16. Anthropometric standardisation and quality control protocols for the construction of new, international, fetal and newborn growth standards: the INTERGROWTH-21st Project.

    PubMed

    Cheikh Ismail, L; Knight, H E; Ohuma, E O; Hoch, L; Chumlea, W C

    2013-09-01

    The primary aim of the INTERGROWTH-21(st) Project is to construct new, prescriptive standards describing optimal fetal and preterm postnatal growth. The anthropometric measurements include the head circumference, recumbent length and weight of the infants, and the stature and weight of the parents. In such a large, international, multicentre project, it is critical that all study sites follow standardised protocols to ensure maximal validity of the growth and nutrition indicators used. This paper describes in detail the anthropometric training, standardisation and quality control procedures used to collect data for these new standards. The initial standardisation session was in Nairobi, Kenya, using newborns, which was followed by similar sessions in the eight participating study sites in Brazil, China, India, Italy, Kenya, Oman, UK and USA. The intraobserver and inter-observer technical error of measurement values for head circumference range from 0.3 to 0.4 cm, and for recumbent length from 0.3 to 0.5 cm. These standardisation protocols implemented at each study site worldwide ensure that the anthropometric data collected are of the highest quality to construct international growth standards. © 2013 Royal College of Obstetricians and Gynaecologists.

  17. Framework for continuous assessment and improvement of occupational health and safety issues in construction companies.

    PubMed

    Mahmoudi, Shahram; Ghasemi, Fakhradin; Mohammadfam, Iraj; Soleimani, Esmaeil

    2014-09-01

    Construction industry is among the most hazardous industries, and needs a comprehensive and simple-to-administer tool to continuously assess and promote its health and safety performance. Through the study of various standard systems (mainly Health, Safety, and Environment Management System; Occupational Health and Safety Assessment Series 180001; and British Standard, occupational health and safety management systems-Guide 8800), seven main elements were determined for the desired framework, and then, by reviewing literature, factors affecting these main elements were determined. The relative importance of each element and its related factors was calculated at organizational and project levels. The provided framework was then implemented in three construction companies, and results were compared together. THE RESULTS OF THE STUDY SHOW THAT THE RELATIVE IMPORTANCE OF THE MAIN ELEMENTS AND THEIR RELATED FACTORS DIFFER BETWEEN ORGANIZATIONAL AND PROJECT LEVELS: leadership and commitment are the most important elements at the organization level, whereas risk assessment and management are most important at the project level. The present study demonstrated that the framework is easy to administer, and by interpreting the results, the main factors leading to the present condition of companies can be determined.

  18. Infrastructure Joint Venture Projects in Malaysia: A Preliminary Study

    NASA Astrophysics Data System (ADS)

    Romeli, Norsyakilah; Muhamad Halil, Faridah; Ismail, Faridah; Sufian Hasim, Muhammad

    2018-03-01

    As many developed country practise, the function of the infrastructure is to connect the each region of Malaysia holistically and infrastructure is an investment network projects such as transportation water and sewerage, power, communication and irrigations system. Hence, a billions allocations of government income reserved for the sake of the infrastructure development. Towards a successful infrastructure development, a joint venture approach has been promotes by 2016 in one of the government thrust in Construction Industry Transformation Plan which encourage the internationalisation among contractors. However, there is depletion in information on the actual practise of the infrastructure joint venture projects in Malaysia. Therefore, this study attempt to explore the real application of the joint venture in Malaysian infrastructure projects. Using the questionnaire survey, a set of survey question distributed to the targeted respondents. The survey contained three section which the sections are respondent details, organizations background and project capital in infrastructure joint venture project. The results recorded and analyse using SPSS software. The contractors stated that they have implemented the joint venture practice with mostly the client with the usual construction period of the infrastructure project are more than 5 years. Other than that, the study indicates that there are problems in the joint venture project in the perspective of the project capital and the railway infrastructure should be given a highlights in future study due to its high significant in term of cost and technical issues.

  19. A near miss: the importance of context in a public health informatics project in a New Zealand case study.

    PubMed

    Wells, Stewart; Bullen, Chris

    2008-01-01

    This article describes the near failure of an information technology (IT) system designed to support a government-funded, primary care-based hepatitis B screening program in New Zealand. Qualitative methods were used to collect data and construct an explanatory model. Multiple incorrect assumptions were made about participants, primary care workflows and IT capacity, software vendor user knowledge, and the health IT infrastructure. Political factors delayed system development and it was implemented untested, almost failing. An intensive rescue strategy included system modifications, relaxation of data validity rules, close engagement with software vendors, and provision of intensive on-site user support. This case study demonstrates that consideration of the social, political, technological, and health care contexts is important for successful implementation of public health informatics projects.

  20. Perspex machine: V. Compilation of C programs

    NASA Astrophysics Data System (ADS)

    Spanner, Matthew P.; Anderson, James A. D. W.

    2006-01-01

    The perspex machine arose from the unification of the Turing machine with projective geometry. The original, constructive proof used four special, perspective transformations to implement the Turing machine in projective geometry. These four transformations are now generalised and applied in a compiler, implemented in Pop11, that converts a subset of the C programming language into perspexes. This is interesting both from a geometrical and a computational point of view. Geometrically, it is interesting that program source can be converted automatically to a sequence of perspective transformations and conditional jumps, though we find that the product of homogeneous transformations with normalisation can be non-associative. Computationally, it is interesting that program source can be compiled for a Reduced Instruction Set Computer (RISC), the perspex machine, that is a Single Instruction, Zero Exception (SIZE) computer.

  1. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  2. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    NASA Astrophysics Data System (ADS)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  3. Unbonded prestressing tendons and their role in the construction of slender elements of buildings

    NASA Astrophysics Data System (ADS)

    Mieszczak, M.

    2018-03-01

    Steel unbonded tendons have been introduced in Europe for construction prestressing many years later than in the USA, Honkong, Singapore or Australia. In Poland, they appeared in the early 1990s. Despite their short application, in the last decade, the Institute of Materials and Building Constructions of the Cracow University of Technology in cooperation with the TCE Structural Design & Consulting company has developed and implemented several interesting and unique designs of building components, using the advantages of this type of prestressing. In the author’s work, apart from the short description of these tendons, several selected (own and foreign) projects of unique character have been presented.

  4. A study to define and verify a model of interactive-constructive elementary school science teaching

    NASA Astrophysics Data System (ADS)

    Henriques, Laura

    This study took place within a four year systemic reform effort collaboratively undertaken by the Science Education Center at the University of Iowa and a local school district. Key features of the inservice project included the use of children's literature as a springboard into inquiry based science investigations, activities to increase parents' involvement in children's science learning and extensive inservice opportunities for elementary teachers to increase content knowledge and content-pedagogical knowledge. The overarching goal of this elementary science teacher enhancement project was to move teachers towards an interactive-constructivist model of teaching and learning. This study had three components. The first was the definition of the prototype teacher indicated by the project's goals and supported by science education research. The second involved the generation of a model to show relationships between teacher-generated products, demographics and their subsequent teaching behaviors. The third involved the verification of the hypothesized model using data collected on 15 original participants. Demographic information, survey responses, interview and written responses to scenarios were among the data collected as source variables. These were scored using a rubric designed to measure constructivist practices in science teaching. Videotapes of science teaching and revised science curricula were collected as downstream variables and scored using an the ESTEEM observational rubric and a rubric developed for the project. Results indicate that newer teachers were more likely to implement features of the project. Those teachers who were philosophically aligned with project goals before project involvement were also more likely to implement features of the project. Other associations between reported beliefs, planning and classroom implementations were not confirmed by these data. Data show that teachers reported higher levels of implementation than their classroom teaching indicated. Qualitative analysis indicated teachers who were more likely to implement the goals of this project were flexible, spontaneous, and able to give students more choices and responsibilities for their own learning. These teachers routinely used children's ideas and interests to guide instruction. Recommendations for future inservice are included. Discussion centers around elements of time, teacher input, teacher reflection, teachers as leaders and leaders' modeling of advocated practices.

  5. The cost risk implementation on design-build project of integrated public spaces child friendly in capital of Jakarta

    NASA Astrophysics Data System (ADS)

    Mardiaman, Mubarok, Abdul

    2017-11-01

    Jakarta area of 662.33 km2 with a population of 10,075,030 inhabitants and green open spaces 9.98%. The Jakarta government built a child-friendly integrated open space as facilities for playing. Providing of facilities was hoped suitable with time, cost, quality, accountability and proper financial governance. Based on the PU ministerial regulation number 19/PRT/M/2015 on the standards and guidelines for procurement the design and construction work on the integrated build and the PU ministerial regulation No. 07/PRT/M/2011 on standards and guidelines for procurement of construction works and consulting services of public works and the ministry of housing. RPTRA development at 123 locations in Jakarta was implemented base on the contract of design and build. The design study was influenced by the cost elements; the main strength (expert), skilled personnel, support personnel, major equipment and support. The construction fee relies on; expert implementation, hardware implementation, preparation work, land, buildings, courtyards, fences, complementary and governance capabilities for human resources in completing the construction activities to minimize the cost risk. Montecarlo simulations was conducted to determine the average unit price, model and analyze systems. In the cost contract, the percentage of design work stipulated 2.5%, build 97.5%. Base on regulation the minister of public work for design work cost 2.72%, build 97.28%. Then, actual cost for design 2.67% and build 97.33%. From the three reference was shown that there are differentiation one another. The acceleration of planning able to make the cost and time more efficient that impact on the implementation margin.

  6. Investigating the determinants of contractor's construction and demolition waste management behavior in Mainland China.

    PubMed

    Wu, Zezhou; Yu, Ann T W; Shen, Liyin

    2017-02-01

    The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. A proposed research program in information processing

    NASA Technical Reports Server (NTRS)

    Schorr, Herbert

    1992-01-01

    The goal of the Formalized Software Development (FSD) project was to demonstrate improvements productivity of software development and maintenance through the use of a new software lifecycle paradigm. The paradigm calls for the mechanical, but human-guided, derivation of software implementations from formal specifications of the desired software behavior. It relies on altering a system's specification and rederiving its implementation as the standard technology for software maintenance. A system definition for this paradigm is composed of a behavioral specification together with a body of annotations that control the derivation of executable code from the specification. Annotations generally achieve the selection of certain data representations and/or algorithms that are consistent with, but not mandated by, the behavioral specification. In doing this, they may yield systems which exhibit only certain behaviors among multiple alternatives permitted by the behavioral specification. The FSD project proposed to construct a testbed in which to explore the realization of this new paradigm. The testbed was to provide operational support environment for software design, implementation, and maintenance. The testbed was proposed to provide highly automated support for individual programmers ('programming in the small'), but not to address the additional needs of programming teams ('programming in the large'). The testbed proposed to focus on supporting rapid construction and evolution of useful prototypes of software systems, as opposed to focusing on the problems of achieving production quality performance of systems.

  8. Constructed wetlands and solar-driven disinfection technologies for sustainable wastewater treatment and reclamation in rural India: SWINGS project.

    PubMed

    Álvarez, J A; Ávila, C; Otter, P; Kilian, R; Istenič, D; Rolletschek, M; Molle, P; Khalil, N; Ameršek, I; Mishra, V K; Jorgensen, C; Garfi, A; Carvalho, P; Brix, H; Arias, C A

    2017-09-01

    SWINGS was a cooperation project between the European Union and India, aiming at implementing state of the art low-cost technologies for the treatment and reuse of domestic wastewater in rural areas of India. The largest wastewater treatment plant consists of a high-rate anaerobic system, followed by vertical and horizontal subsurface flow constructed wetlands with a treatment area of around 1,900 m 2 and a final step consisting of solar-driven anodic oxidation (AO) and ultraviolet (UV) disinfection units allowing direct reuse of the treated water. The implementation and operation of two pilot plants in north (Aligarh Muslim University, AMU) and central India (Indira Gandhi National Tribal University, IGNTU) are shown in this study. The overall performance of AMU pilot plant during the first 7 months of operation showed organic matter removal efficiencies of 87% total suspended solids, 95% 5-day biological oxygen demand (BOD 5 ) and 90% chemical oxygen demand, while Kjeldahl nitrogen removal reached 89%. The UV disinfection unit produces water for irrigation and toilet flushing with pathogenic indicator bacteria well below WHO guidelines. On the other hand, the AO disinfection unit implemented at IGNTU and operated for almost a year has been shown to produce an effluent of sufficient quality to be reused by the local population for agriculture and irrigation.

  9. An Exploration of the Effect of Community Engagement in Research on Perceived Outcomes of Partnered Mental Health Services Projects*

    PubMed Central

    Khodyakov, Dmitry; Stockdale, Susan; Jones, Felica; Ohito, Elizabeth; Jones, Andrea; Lizaola, Elizabeth; Mango, Joseph

    2011-01-01

    Mental health research projects address sensitive issues for vulnerable populations and are implemented in complex environments. Community-Based Participatory Research approaches are recommended for health research on vulnerable populations, but little is known about how variation in participation affects outcomes of partnered research projects. We developed a conceptual model demonstrating the impact of community engagement in research on outcomes of partnered projects. We collected data on key constructs from community and academic leaders of 21 sampled partnered research projects in two cycles of an NIMH research center. We conducted empirical analyses to test the model. Our findings suggest that community engagement in research is positively associated with perceived professional development, as well as political and community impact. PMID:22582144

  10. Implementation of the Brazilian National Repository - RBMN Project - 13008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cassia Oliveira de Tello, Cledola

    2013-07-01

    Ionizing radiation in Brazil is used in electricity generation, medicine, industry, agriculture and for research and development purposes. All these activities can generate radioactive waste. At this point, in Brazil, the use of nuclear energy and radioisotopes justifies the construction of a national repository for radioactive wastes of low and intermediate-level. According to Federal Law No. 10308, Brazilian National Commission for Nuclear Energy (CNEN) is responsible for designing and constructing the intermediate and final storages for radioactive wastes. Additionally, a restriction on the construction of Angra 3 is that the repository is under construction until its operation start, attaining somemore » requirements of the Brazilian Environmental Regulator (IBAMA). Besides this NPP, in the National Energy Program is previewed the installation of four more plants, by 2030. In November 2008, CNEN launched the Project RBMN (Repository for Low and Intermediate-Level Radioactive Wastes), which aims at the implantation of a National Repository for disposal of low and intermediate-level of radiation wastes. This Project has some aspects that are unique in the Brazilian context, especially referring to the time between its construction and the end of its institutional period. This time is about 360 years, when the area will be released for unrestricted uses. It means that the Repository must be safe and secure for more than three hundred years, which is longer than half of the whole of Brazilian history. This aspect is very new for the Brazilian people, bringing a new dimension to public acceptance. Another point is this will be the first repository in South America, bringing a real challenge for the continent. The current status of the Project is summarized. (authors)« less

  11. Implementing Green Walls in Schools.

    PubMed

    McCullough, Michael B; Martin, Michael D; Sajady, Mollika A

    2018-01-01

    Numerous studies in applied pedagogical design have shown that, at all educational levels, direct exposure to the natural environment can enhance learning by improving student attention and behaviors. Implementing green walls-a "vertical garden," or "living wall" interior wall that typically includes greenery, a growing medium (soil or substrate) and a water delivery system-provides environmental health benefits, but also provides a practical application within classrooms for minimizing directed attention fatigue in students by connecting them to "outdoor nature" within the indoor environment. Hands-on "project-based" learning is another pedagogical strategy that has proved to be effective across the spectrum of educational levels and across subject areas. Green walls have the potential to inspire critical thinking through a combination of project-based learning strategies and environmental education. The authors have outlined a curriculum involving the implementation of an indoor living wall system within a classroom-learning environment, incorporating project-based learning modules that interact with the wall. In conjunction with the passive health benefits of a green wall, project-based curriculum models can connect students interactively with indoor nature and have the potential to inspire real-world thinking related to science, technology, engineering, art, and mathematics fields within the indoor learning environment. Through a combination of these passive and interactive modes, students are connected to nature in the indoor environment regardless of weather conditions outdoors. Future research direction could include post-construction studies of the effectiveness of project-based curricula related to living walls, and the long-term impacts of implementing green walls in classrooms on school achievement and student behaviors.

  12. Proposed Requirements-driven User-scenario Development Protocol for the Belmont Forum E-Infrastructure and Data Management Cooperative Research Agreement

    NASA Astrophysics Data System (ADS)

    Wee, B.; Car, N.; Percivall, G.; Allen, D.; Fitch, P. G.; Baumann, P.; Waldmann, H. C.

    2014-12-01

    The Belmont Forum E-Infrastructure and Data Management Cooperative Research Agreement (CRA) is designed to foster a global community to collaborate on e-infrastructure challenges. One of the deliverables is an implementation plan to address global data infrastructure interoperability challenges and align existing domestic and international capabilities. Work package three (WP3) of the CRA focuses on the harmonization of global data infrastructure for sharing environmental data. One of the subtasks under WP3 is the development of user scenarios that guide the development of applicable deliverables. This paper describes the proposed protocol for user scenario development. It enables the solicitation of user scenarios from a broad constituency, and exposes the mechanisms by which those solicitations are evaluated against requirements that map to the Belmont Challenge. The underlying principle of traceability forms the basis for a structured, requirements-driven approach resulting in work products amenable to trade-off analyses and objective prioritization. The protocol adopts the ISO Reference Model for Open Distributed Processing (RM-ODP) as a top level framework. User scenarios are developed within RM-ODP's "Enterprise Viewpoint". To harmonize with existing frameworks, the protocol utilizes the conceptual constructs of "scenarios", "use cases", "use case categories", and use case templates as adopted by recent GEOSS Architecture Implementation Project (AIP) deliverables and CSIRO's eReefs project. These constructs are encapsulated under the larger construct of "user scenarios". Once user scenarios are ranked by goodness-of-fit to the Belmont Challenge, secondary scoring metrics may be generated, like goodness-of-fit to FutureEarth science themes. The protocol also facilitates an assessment of the ease of implementing given user scenario using existing GEOSS AIP deliverables. In summary, the protocol results in a traceability graph that can be extended to coordinate across research programmes. If implemented using appropriate technologies and harmonized with existing ontologies, this approach enables queries, sensitivity analyses, and visualization of complex relationships.

  13. Lunar surface vehicle model competition

    NASA Technical Reports Server (NTRS)

    1990-01-01

    During Fall and Winter quarters, Georgia Tech's School of Mechanical Engineering students designed machines and devices related to Lunar Base construction tasks. These include joint projects with Textile Engineering students. Topics studied included lunar environment simulator via drop tower technology, lunar rated fasteners, lunar habitat shelter, design of a lunar surface trenching machine, lunar support system, lunar worksite illumination (daytime), lunar regolith bagging system, sunlight diffusing tent for lunar worksite, service apparatus for lunar launch vehicles, lunar communication/power cables and teleoperated deployment machine, lunar regolith bag collection and emplacement device, soil stabilization mat for lunar launch/landing site, lunar rated fastening systems for robotic implementation, lunar surface cable/conduit and automated deployment system, lunar regolith bagging system, and lunar rated fasteners and fastening systems. A special topics team of five Spring quarter students designed and constructed a remotely controlled crane implement for the SKITTER model.

  14. Stochastic Modeling of the Environmental Impacts of the Mingtang Tunneling Project

    NASA Astrophysics Data System (ADS)

    Li, Xiaojun; Li, Yandong; Chang, Ching-Fu; Chen, Ziyang; Tan, Benjamin Zhi Wen; Sege, Jon; Wang, Changhong; Rubin, Yoram

    2017-04-01

    This paper investigates the environmental impacts of a major tunneling project in China. Of particular interest is the drawdown of the water table, due to its potential impacts on ecosystem health and on agricultural activity. Due to scarcity of data, the study pursues a Bayesian stochastic approach, which is built around a numerical model. We adopted the Bayesian approach with the goal of deriving the posterior distributions of the dependent variables conditional on local data. The choice of the Bayesian approach for this study is somewhat non-trivial because of the scarcity of in-situ measurements. The thought guiding this selection is that prior distributions for the model input variables are valuable tools even if that all inputs are available, the Bayesian approach could provide a good starting point for further updates as and if additional data becomes available. To construct effective priors, a systematic approach was developed and implemented for constructing informative priors based on other, well-documented sites which bear geological and hydrological similarity to the target site (the Mingtang tunneling project). The approach is built around two classes of similarity criteria: a physically-based set of criteria and an additional set covering epistemic criteria. The prior construction strategy was implemented for the hydraulic conductivity of various types of rocks at the site (Granite and Gneiss) and for modeling the geometry and conductivity of the fault zones. Additional elements of our strategy include (1) modeling the water table through bounding surfaces representing upper and lower limits, and (2) modeling the effective conductivity as a random variable (varying between realizations, not in space). The approach was tested successfully against its ability to predict the tunnel infiltration fluxes and against observations of drying soils.

  15. Simulation of tunneling construction methods of the Cisumdawu toll road

    NASA Astrophysics Data System (ADS)

    Abduh, Muhamad; Sukardi, Sapto Nugroho; Ola, Muhammad Rusdian La; Ariesty, Anita; Wirahadikusumah, Reini D.

    2017-11-01

    Simulation can be used as a tool for planning and analysis of a construction method. Using simulation technique, a contractor could design optimally resources associated with a construction method and compare to other methods based on several criteria, such as productivity, waste, and cost. This paper discusses the use of simulation using Norwegian Method of Tunneling (NMT) for a 472-meter tunneling work in the Cisumdawu Toll Road project. Primary and secondary data were collected to provide useful information for simulation as well as problems that may be faced by the contractor. The method was modelled using the CYCLONE and then simulated using the WebCYCLONE. The simulation could show the duration of the project from the duration model of each work tasks which based on literature review, machine productivity, and several assumptions. The results of simulation could also show the total cost of the project that was modeled based on journal construction & building unit cost and online websites of local and international suppliers. The analysis of the advantages and disadvantages of the method was conducted based on its, wastes, and cost. The simulation concluded the total cost of this operation is about Rp. 900,437,004,599 and the total duration of the tunneling operation is 653 days. The results of the simulation will be used for a recommendation to the contractor before the implementation of the already selected tunneling operation.

  16. A Pragmatic Approach to Guide Implementation Evaluation Research: Strategy Mapping for Complex Interventions.

    PubMed

    Huynh, Alexis K; Hamilton, Alison B; Farmer, Melissa M; Bean-Mayberry, Bevanne; Stirman, Shannon Wiltsey; Moin, Tannaz; Finley, Erin P

    2018-01-01

    Greater specification of implementation strategies is a challenge for implementation science, but there is little guidance for delineating the use of multiple strategies involved in complex interventions. The Cardiovascular (CV) Toolkit project entails implementation of a toolkit designed to reduce CV risk by increasing women's engagement in appropriate services. The CV Toolkit project follows an enhanced version of Replicating Effective Programs (REP), an evidence-based implementation strategy, to implement the CV Toolkit across four phases: pre-conditions, pre-implementation, implementation, and maintenance and evolution. Our current objective is to describe a method for mapping implementation strategies used in real time as part of the CV Toolkit project. This method supports description of the timing and content of bundled strategies and provides a structured process for developing a plan for implementation evaluation. We conducted a process of strategy mapping to apply Proctor and colleagues' rubric for specification of implementation strategies, constructing a matrix in which we identified each implementation strategy, its conceptual group, and the corresponding REP phase(s) in which it occurs. For each strategy, we also specified the actors involved, actions undertaken, action targets, dose of the implementation strategy, and anticipated outcome addressed. We iteratively refined the matrix with the implementation team, including use of simulation to provide initial validation. Mapping revealed patterns in the timing of implementation strategies within REP phases. Most implementation strategies involving the development of stakeholder interrelationships and training and educating stakeholders were introduced during the pre-conditions or pre-implementation phases. Strategies introduced in the maintenance and evolution phase emphasized communication, re-examination, and audit and feedback. In addition to its value for producing valid and reliable process evaluation data, mapping implementation strategies has informed development of a pragmatic blueprint for implementation and longitudinal analyses and evaluation activities. We update recent recommendations on specification of implementation strategies by considering the implications for multi-strategy frameworks and propose an approach for mapping the use of implementation strategies within complex, multi-level interventions, in support of rigorous evaluation. Developing pragmatic tools to aid in operationalizing the conduct of implementation and evaluation activities is essential to enacting sound implementation research.

  17. Clinical Consultation Systems: Designing for the Physician as Computer User

    PubMed Central

    Shortliffe, Edward H.

    1981-01-01

    The barriers to successful implementation of consultation systems for physicians have been frequently discussed. Our research has been directed at the development of computer techniques that will heighten the acceptance of high performance decision making tools. We discuss two current projects at Stanford Medical School that address both practical and theoretical issues in the design and construction of clinically useful systems.

  18. Towards the Development of a New Model for Best Practice and Knowledge Construction in Virtual Campuses

    ERIC Educational Resources Information Center

    Cartelli, Antonio; Stansfield, Mark; Connolly, Thomas; Jimoyiannis, Athanassios; Magalhaes, Hugo; Maillet, Katherine

    2008-01-01

    This paper reports on the work of a European Commission DG Education and Culture co-financed project PBP-VC, Promoting Best Practice in Virtual Campuses, which is aimed at providing a deeper understanding of the key issues and critical success factors underlying the implementation of virtual campuses. The paper outlines a tentative model of issues…

  19. Content validity of governing in Building Information Modelling (BIM) implementation assessment instrument

    NASA Astrophysics Data System (ADS)

    Hadzaman, N. A. H.; Takim, R.; Nawawi, A. H.; Mohamad Yusuwan, N.

    2018-04-01

    BIM governance assessment instrument is a process of analysing the importance in developing BIM governance solution to tackle the existing problems during team collaboration in BIM-based projects. Despite the deployment of integrative technologies in construction industry particularly BIM, it is still insufficient compare to other sectors. Several studies have been established the requirements of BIM implementation concerning all technical and non-technical BIM adoption issues. However, the data are regarded as inadequate to develop a BIM governance framework. Hence, the objective of the paper is to evaluate the content validity of the BIM governance instrument prior to the main data collection. Two methods were employed in the form of literature review and questionnaire survey. Based on the literature review, 273 items with six main constructs are suggested to be incorporated in the BIM governance instrument. The Content Validity Ratio (CVR) scores revealed that 202 out of 273 items are considered as the utmost critical by the content experts. The findings for Item Level Content Validity Index (I-CVI) and Modified Kappa Coefficient however revealed that 257 items in BIM governance instrument are appropriate and excellent. The instrument is highly reliable for future strategies and the development of BIM projects in Malaysia.

  20. Determining Safety Inspection Thresholds for Employee Incentives Programs on Construction Sites

    PubMed Central

    Sparer, Emily; Dennerlein, Jack

    2017-01-01

    The goal of this project was to evaluate approaches of determining the numerical value of a safety inspection score that would activate a reward in an employee safety incentive program. Safety inspections are a reflection of the physical working conditions at a construction site and provide a safety score that can be used in incentive programs to reward workers. Yet it is unclear what level of safety should be used when implementing this kind of program. This study explored five ways of grouping safety inspection data collected during 19 months at Harvard University-owned construction projects. Each approach grouped the data by one of the following: owner, general contractor, project, trade, or subcontractor. The median value for each grouping provided the threshold score. These five approaches were then applied to data from a completed project in order to calculate the frequency and distribution of rewards in a monthly safety incentive program. The application of each approach was evaluated qualitatively for consistency, competitiveness, attainability, and fairness. The owner-specific approach resulted in a threshold score of 96.3% and met all of the qualitative evaluation goals. It had the most competitive reward distribution (only 1/3 of the project duration) yet it was also attainable. By treating all workers equally and maintaining the same value throughout the project duration, this approach was fair and consistent. The owner-based approach for threshold determination can be used by owners or general contractors when creating leading indicator incentives programs and by researchers in future studies on incentive program effectiveness. PMID:28638178

  1. Student use of a Learning Management System for group projects: A case study investigating interaction, collaboration, and knowledge construction

    NASA Astrophysics Data System (ADS)

    Lonn, Steven D.

    Web-based Learning Management Systems (LMS) allow instructors and students to share instructional materials, make class announcements, submit and return course assignments, and communicate with each other online. Previous LMS-related research has focused on how these systems deliver and manage instructional content with little concern for how students' constructivist learning can be encouraged and facilitated. This study investigated how students use LMS to interact, collaborate, and construct knowledge within the context of a group project but without mediation by the instructor. The setting for this case study was students' use in one upper-level biology course of the local LMS within the context of a course-related group project, a mock National Institutes of Health grant proposal. Twenty-one groups (82 students) voluntarily elected to use the LMS, representing two-thirds of all students in the course. Students' peer-to-peer messages within the LMS, event logs, online surveys, focus group interviews, and instructor interviews were used in order to answer the study's overarching research question. The results indicate that students successfully used the LMS to interact and, to a significant extent, collaborate, but there was very little evidence of knowledge construction using the LMS technology. It is possible that the ease and availability of face-to-face meetings as well as problems and limitations with the technology were factors that influenced whether students' online basic interaction could be further distinguished as collaboration or knowledge construction. Despite these limitations, students found several tools and functions of the LMS useful for their online peer interaction and completion of their course project. Additionally, LMS designers and implementers are urged to consider previous literature on computer-supported collaborative learning environments in order to better facilitate independent group projects within these systems. Further research is needed to identify the best types of scaffolds and overall technological improvements in order to provide support for online collaboration and knowledge construction.

  2. Environmental Management and the New Politics of Western Water: The Animas-La Plata Project and Implementation of the Endangered Species Act.

    PubMed

    ELLISON

    1999-05-01

    / This paper explores the new politics of western water policy through an examination of the Animas-La Plata water project and implementation of the Endangered Species Act. It is suggested that the focus of western water programming has shifted from the source of distributed funds, the United States Congress, to the agencies originally created to deliver federal benefits because funding for new project construction has not been forthcoming. Under this new system, members of Congress continue to excite their constituents with promises of money for new project starts, while the administrative agencies perform the myriad duties needed to keep these projects alive. The result is that political objectives have replaced operational/management objectives in administrative processes. In this case, the author demonstrates how resource managers in the Bureau of Reclamation manipulated hydrological analysis to control administrative process, why their manipulation was unfair, and perhaps illegal, and why biologists from the US Fish and Wildlife Service accepted the analysis. While ostensibly protecting all interests, the result is that none of the objectives of federal water programming are achieved. KEY WORDS: Environmental management; Administrative politics; Water policy; Endangered Species Act; Animas-La Plata, Bureau of Reclamation

  3. Design of the Grimethorpe Experimental Facility as of March 1981: a technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-06-01

    The Experimental Pressurized Fluidized Bed Combustor, which has been built as an extension to the National Coal Board Power Station, which is adjacent to Grimethorpe Colliery, Yorkshire, England, is described in this report. The Governments of the United Kingdom, the United States of America and the Federal Republic of Germany, under the auspices of the International Energy Agency, have agreed to share equally between them the costs of building and operating the plant. Control of the project was vested in an Executive Committee consisting of one representative of each Government with all decisions requiring unanimity. The actual operation of themore » project was vested in an Operating Agent, NCB (IEA Services) Ltd., a wholly owned subsidiary of the National Coal Board. The Implementing Agreement envisages a seven year project to be executed in four stages: (1) Procurement of Design Study with accompanying tender documents. (2) Tendering for construction of the Plant; study of appraisal of tenders. (3) Construction and acceptance of the Plant. (4) Operation of the Plant. The project is now towards the end of Stage 3. Construction has been completed and commissioning is in progress to prepare the plant for the start of the operational phase in Autumn 1981. Because of the confidentiality of much of the design information, for the purposes of this report technical descriptions have been confined to that of a general appraisal.« less

  4. Overview of the BioBank Japan Project: Study design and profile.

    PubMed

    Nagai, Akiko; Hirata, Makoto; Kamatani, Yoichiro; Muto, Kaori; Matsuda, Koichi; Kiyohara, Yutaka; Ninomiya, Toshiharu; Tamakoshi, Akiko; Yamagata, Zentaro; Mushiroda, Taisei; Murakami, Yoshinori; Yuji, Koichiro; Furukawa, Yoichi; Zembutsu, Hitoshi; Tanaka, Toshihiro; Ohnishi, Yozo; Nakamura, Yusuke; Kubo, Michiaki

    2017-03-01

    The BioBank Japan (BBJ) Project was launched in 2003 with the aim of providing evidence for the implementation of personalized medicine by constructing a large, patient-based biobank (BBJ). This report describes the study design and profile of BBJ participants who were registered during the first 5-year period of the project. The BBJ is a registry of patients diagnosed with any of 47 target common diseases. Patients were enrolled at 12 cooperative medical institutes all over Japan from June 2003 to March 2008. Clinical information was collected annually via interviews and medical record reviews until 2013. We collected DNA from all participants at baseline and collected annual serum samples until 2013. In addition, we followed patients who reported a history of 32 of the 47 target diseases to collect survival data, including cause of death. During the 5-year period, 200,000 participants were registered in the study. The total number of cases was 291,274 at baseline. Baseline data for 199,982 participants (53.1% male) were available for analysis. The average age at entry was 62.7 years for men and 61.5 years for women. Follow-up surveys were performed for participants with any of 32 diseases, and survival time data for 141,612 participants were available for analysis. The BBJ Project has constructed the infrastructure for genomic research for various common diseases. This clinical information, coupled with genomic data, will provide important clues for the implementation of personalized medicine. Copyright © 2017 The Authors. Production and hosting by Elsevier B.V. All rights reserved.

  5. Application of multi-criteria decision analysis in selecting of sustainable investments

    NASA Astrophysics Data System (ADS)

    Kozik, Renata

    2017-07-01

    Investors of construction projects, especially financed with public money, quite slowly adapt environmentally friendly solutions, e.g. passive buildings. Practice shows that the use of green public procurement among the public investors is negligible. Energy-saving technologies and equipment are expensive at the construction phase and investors less or not at all take into account the future operating costs. The aim of this article is to apply the method of multi-criteria analysis ELECTRE to select the best investment in terms of cost of implementation, operation, as well as the impact on the environment.

  6. Estimation of construction and demolition waste volume generation in new residential buildings in Spain.

    PubMed

    Villoria Sáez, Paola; del Río Merino, Mercedes; Porras-Amores, César

    2012-02-01

    The management planning of construction and demolition (C&D) waste uses a single indicator which does not provide enough detailed information. Therefore the determination and implementation of other innovative and precise indicators should be determined. The aim of this research work is to improve existing C&D waste quantification tools in the construction of new residential buildings in Spain. For this purpose, several housing projects were studied to determine an estimation of C&D waste generated during their construction process. This paper determines the values of three indicators to estimate the generation of C&D waste in new residential buildings in Spain, itemizing types of waste and construction stages. The inclusion of two more accurate indicators, in addition to the global one commonly in use, provides a significant improvement in C&D waste quantification tools and management planning.

  7. A Big-Data-based platform of workers' behavior: Observations from the field.

    PubMed

    Guo, S Y; Ding, L Y; Luo, H B; Jiang, X Y

    2016-08-01

    Behavior-Based Safety (BBS) has been used in construction to observe, analyze and modify workers' behavior. However, studies have identified that BBS has several limitations, which have hindered its effective implementation. To mitigate the negative impact of BBS, this paper uses a case study approach to develop a Big-Data-based platform to classify, collect and store data about workers' unsafe behavior that is derived from a metro construction project. In developing the platform, three processes were undertaken: (1) a behavioral risk knowledge base was established; (2) images reflecting workers' unsafe behavior were collected from intelligent video surveillance and mobile application; and (3) images with semantic information were stored via a Hadoop Distributed File System (HDFS). The platform was implemented during the construction of the metro-system and it is demonstrated that it can effectively analyze semantic information contained in images, automatically extract workers' unsafe behavior and quickly retrieve on HDFS as well. The research presented in this paper can enable construction organizations with the ability to visualize unsafe acts in real-time and further identify patterns of behavior that can jeopardize safety outcomes. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    NASA Astrophysics Data System (ADS)

    Gales, S.; Zamfir, N. V.

    2015-02-01

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  9. Schedule Risk Analysis Of Southern Mainway Construction In Jember Regency

    NASA Astrophysics Data System (ADS)

    Susilo, K.; Wiguna, I. P. A.; Adi, T. J. W.

    2017-11-01

    In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

  10. Translational education: tools for implementing the CanMEDS competencies in Canadian urology residency training

    PubMed Central

    Mickelson, J.J.; MacNeily, A.E.

    2008-01-01

    It has been more than a decade since the Royal College of Physicians and Surgeons of Canada implemented the Canadian Medical Education Directives for Specialists (CanMEDS) project. Despite frequent and widespread correspondence to Canadian practitioners and educators, the adoption of the 7 core competencies espoused by CanMEDS has been slow. Barriers to the teaching and acquisition of these skills include a lack of understanding of what they actually represent, a paucity of tools to teach them and an inability to quantify performance. It is essential to translate the goals of the CanMEDS project into clinically relevant concepts. We define the current status of the CanMEDS competencies with respect to urological training and provide some context to what has been, until now, a poorly defined and abstract educational construct. PMID:18781207

  11. Behavior-based safety on construction sites: a case study.

    PubMed

    Choudhry, Rafiq M

    2014-09-01

    This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in unsafe behaviors and significant increases in safe behaviors. The results of this case study showed that an approach based on goal setting, feedback, and an effective measure of safety behavior if properly applied by committed management, can improve safety performance significantly in construction site environments. The results proved that the BBS management technique can be applied to any country's culture, showing that it would be a good approach for improving the safety of front-line workers and that it has industry wide application for ongoing construction projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Automated Reuse of Scientific Subroutine Libraries through Deductive Synthesis

    NASA Technical Reports Server (NTRS)

    Lowry, Michael R.; Pressburger, Thomas; VanBaalen, Jeffrey; Roach, Steven

    1997-01-01

    Systematic software construction offers the potential of elevating software engineering from an art-form to an engineering discipline. The desired result is more predictable software development leading to better quality and more maintainable software. However, the overhead costs associated with the formalisms, mathematics, and methods of systematic software construction have largely precluded their adoption in real-world software development. In fact, many mainstream software development organizations, such as Microsoft, still maintain a predominantly oral culture for software development projects; which is far removed from a formalism-based culture for software development. An exception is the limited domain of safety-critical software, where the high-assuiance inherent in systematic software construction justifies the additional cost. We believe that systematic software construction will only be adopted by mainstream software development organization when the overhead costs have been greatly reduced. Two approaches to cost mitigation are reuse (amortizing costs over many applications) and automation. For the last four years, NASA Ames has funded the Amphion project, whose objective is to automate software reuse through techniques from systematic software construction. In particular, deductive program synthesis (i.e., program extraction from proofs) is used to derive a composition of software components (e.g., subroutines) that correctly implements a specification. The construction of reuse libraries of software components is the standard software engineering solution for improving software development productivity and quality.

  13. 2006 Long Range Development Plan Final Environmental ImpactReport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Philliber, Jeff

    2007-01-22

    This environmental impact report (EIR) has been prepared pursuant to the applicable provisions of the California Environmental Quality Act (CEQA) and its implementing guidelines (CEQA Guidelines), and the Amended University of California Procedures for Implementation of the California Environmental Quality Act (UC CEQA Procedures). The University of California (UC or the University) is the lead agency for this EIR, which examines the overall effects of implementation of the proposed 2006 Long Range Development Plan (LRDP; also referred to herein as the 'project' for purposes of CEQA) for Lawrence Berkeley National Laboratory (LBNL; also referred to as 'Berkeley Lab,' 'the Laboratory,'more » or 'the Lab' in this document). An LRDP is a land use plan that guides overall development of a site. The Lab serves as a special research campus operated by the University employees, but it is owned and financed by the federal government and as such it is distinct from the UC-owned Berkeley Campus. As a campus operated by the University of California, the Laboratory is required to prepare an EIR for an LRDP when one is prepared or updated pursuant to Public Resources Code Section 21080.09. The adoption of an LRDP does not constitute a commitment to, or final decision to implement, any specific project, construction schedule, or funding priority. Rather, the proposed 2006 LRDP describes an entire development program of approximately 980,000 gross square feet of new research and support space construction and 320,000 gross square feet of demolition of existing facilities, for a total of approximately 660,000 gross square feet of net new occupiable space for the site through 2025. Specific projects will undergo CEQA review at the time proposed to determine what, if any, additional review is necessary prior to approval. As described in Section 1.4.2, below, and in Chapter 3 of this EIR (the Project Description), the size of the project has been reduced since the Notice of Preparation for this EIR was issued. This reduction was in response to consultation with the City of Berkeley as well as other factors. CEQA requires that, before a decision can be made by a state or local government agency to approve a project that may have significant environmental effects, an EIR must be prepared that fully describes the environmental effects of the project. The EIR is a public informational document for use by University decision-makers and the public. It is intended to identify and evaluate potential environmental consequences of the proposed project, to identify mitigation measures that would lessen or avoid significant adverse impacts, and to examine feasible alternatives to the project. The information contained in the EIR is reviewed and considered by the lead agency prior to its action to approve, disapprove, or modify the proposed project.« less

  14. ANNETTE Project: Contributing to The Nuclearization of Fusion

    NASA Astrophysics Data System (ADS)

    Ambrosini, W.; Cizelj, L.; Dieguez Porras, P.; Jaspers, R.; Noterdaeme, J.; Scheffer, M.; Schoenfelder, C.

    2018-01-01

    The ANNETTE Project (Advanced Networking for Nuclear Education and Training and Transfer of Expertise) is well underway, and one of its work packages addresses the design, development and implementation of nuclear fusion training. A systematic approach is used that leads to the development of new training courses, based on identified nuclear competences needs of the work force of (future) fusion reactors and on the current availability of suitable training courses. From interaction with stakeholders involved in the ITER design and construction or the JET D-T campaign, it became clear that the lack of nuclear safety culture awareness already has an impact on current projects. Through the collaboration between the European education networks in fission (ENEN) and fusion (FuseNet) in the ANNETTE project, this project is well positioned to support the development of nuclear competences for ongoing and future fusion projects. Thereby it will make a clear contribution to the realization of fusion energy.

  15. Improving data quality across 3 sub-Saharan African countries using the Consolidated Framework for Implementation Research (CFIR): results from the African Health Initiative.

    PubMed

    Gimbel, Sarah; Mwanza, Moses; Nisingizwe, Marie Paul; Michel, Cathy; Hirschhorn, Lisa

    2017-12-21

    High-quality data are critical to inform, monitor and manage health programs. Over the seven-year African Health Initiative of the Doris Duke Charitable Foundation, three of the five Population Health Implementation and Training (PHIT) partnership projects in Mozambique, Rwanda, and Zambia introduced strategies to improve the quality and evaluation of routinely-collected data at the primary health care level, and stimulate its use in evidence-based decision-making. Using the Consolidated Framework for Implementation Research (CFIR) as a guide, this paper: 1) describes and categorizes data quality assessment and improvement activities of the projects, and 2) identifies core intervention components and implementation strategy adaptations introduced to improve data quality in each setting. The CFIR was adapted through a qualitative theme reduction process involving discussions with key informants from each project, who identified two domains and ten constructs most relevant to the study aim of describing and comparing each country's data quality assessment approach and implementation process. Data were collected on each project's data quality improvement strategies, activities implemented, and results via a semi-structured questionnaire with closed and open-ended items administered to health management information systems leads in each country, with complementary data abstraction from project reports. Across the three projects, intervention components that aligned with user priorities and government systems were perceived to be relatively advantageous, and more readily adapted and adopted. Activities that both assessed and improved data quality (including data quality assessments, mentorship and supportive supervision, establishment and/or strengthening of electronic medical record systems), received higher ranking scores from respondents. Our findings suggest that, at a minimum, successful data quality improvement efforts should include routine audits linked to ongoing, on-the-job mentoring at the point of service. This pairing of interventions engages health workers in data collection, cleaning, and analysis of real-world data, and thus provides important skills building with on-site mentoring. The effect of these core components is strengthened by performance review meetings that unify multiple health system levels (provincial, district, facility, and community) to assess data quality, highlight areas of weakness, and plan improvements.

  16. Systems Engineering and Reusable Avionics

    NASA Technical Reports Server (NTRS)

    Conrad, James M.; Murphy, Gloria

    2010-01-01

    One concept for future space flights is to construct building blocks for a wide variety of avionics systems. Once a unit has served its original purpose, it can be removed from the original vehicle and reused in a similar or dissimilar function, depending on the function blocks the unit contains. For example: Once a lunar lander has reached the moon's surface, an engine controller for the Lunar Decent Module would be removed and used for a lunar rover motor control unit or for a Environmental Control Unit for a Lunar Habitat. This senior design project included the investigation of a wide range of functions of space vehicles and possible uses. Specifically, this includes: (1) Determining and specifying the basic functioning blocks of space vehicles. (2) Building and demonstrating a concept model. (3) Showing high reliability is maintained. The specific implementation of this senior design project included a large project team made up of Systems, Electrical, Computer, and Mechanical Engineers/Technologists. The efforts were made up of several sub-groups that each worked on a part of the entire project. The large size and complexity made this project one of the more difficult to manage and advise. Typical projects only have 3-4 students, but this project had 10 students from five different disciplines. This paper describes the difference of this large project compared to typical projects, and the challenges encountered. It also describes how the systems engineering approach was successfully implemented so that the students were able to meet nearly all of the project requirements.

  17. Obstacles to implementation of an intervention to improve surgical services in an Ethiopian hospital: a qualitative study of an international health partnership project.

    PubMed

    Aveling, Emma-Louise; Zegeye, Desalegn Tegabu; Silverman, Michael

    2016-08-17

    Access to safe surgical care represents a critical gap in healthcare delivery and development in many low- and middle-income countries, including Ethiopia. Quality improvement (QI) initiatives at hospital level may contribute to closing this gap. Many such quality improvement initiatives are carried out through international health partnerships. Better understanding of how to optimise quality improvement in low-income settings is needed, including through partnership-based approaches. Drawing on a process evaluation of an intervention to improve surgical services in an Ethiopian hospital, this paper offers lessons to help meet this need. We conducted a qualitative process evaluation of a quality improvement project which aimed to improve access to surgical services in an Ethiopian referral hospital through better management. Data was collected longitudinally and included: 66 in-depth interviews with surgical staff and project team members; observation (135 h) in the surgery department and of project meetings; project-related documentation. Thematic analysis, guided by theoretical constructs, focused on identifying obstacles to implementation. The project largely failed to achieve its goals. Key barriers related to project design, partnership working and the implementation context, and included: confusion over project objectives and project and partner roles and responsibilities; logistical challenges concerning overseas visits; difficulties in communication; gaps between the time and authority team members had and that needed to implement and engage other staff; limited strategies for addressing adaptive-as opposed to technical-challenges; effects of hierarchy and resource scarcity on QI efforts. While many of the obstacles identified are common to diverse settings, our findings highlight ways in which some features of low-income country contexts amplify these common challenges. We identify lessons for optimising the design and planning of quality improvement interventions within such challenging healthcare contexts, with specific reference to international partnership-based approaches. These include: the need for a funded lead-in phase to clarify and agree goals, roles, mutual expectations and communication strategies; explicitly incorporating adaptive, as well as technical, solutions; transparent management of resources and opportunities; leadership which takes account of both formal and informal power structures; and articulating links between project goals and wider organisational interests.

  18. Program Translation via Abstraction and Reimplementation.

    DTIC Science & Technology

    1986-12-01

    fromn particular datai flow and control flow constructs. In add non , the analysis is narrow in scope. aiming onlx to gather enoiugh intoination to...NUMSIERS 545 Technology Square U) Cambridge, MA 02139 00 CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Advanced Research Projects Agency December... designed which generates extremely efficient PDP-II object code for Pascal programs. Currently, work is proceeding toward the implementation of a

  19. The acceptance of green technology: A case study in Sabah Development Corridor

    NASA Astrophysics Data System (ADS)

    Jainudin, Noor Azland; Jugah, Ivy; Ali, Awang Nasrizal Awang; Tawie, Rudy

    2017-08-01

    Green technology is the development and application of products, equipment and systems used to conserve the environment which minimizes the negative impact from human activities. The technology can be in the form of green buildings or renewable energy such as hydro, solar and biogas. Development in SDC is still at the early stage, hence there is a prospect to plan for proper green concept implementation. With the increasing number of construction projects particularly in the rapid developing city of Kota Kinabalu, green technology as a whole is becoming more significant as it helps to develop effective solutions to encounter global environmental issues. Although there has been lengthy discussion on the green technology, the visibility of the implementation is still yet to be seen widely in Kota Kinabalu. The implementation of green technology in construction will support dynamic growth of economic development activities, while improving the environment. Hence, it is important to develop a strategic plan to promote the use of green technology while the areas are still developing. The focus of this correlative-based approach study is to investigate the perception and implementation of green technology in Kota Kinabalu from the industrial perspectives.

  20. Appraising the value of independent EIA follow-up verifiers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wessels, Jan-Albert, E-mail: janalbert.wessels@nwu.ac.za; Retief, Francois, E-mail: francois.retief@nwu.ac.za; Morrison-Saunders, Angus, E-mail: A.Morrison-Saunders@murdoch.edu.au

    Independent Environmental Impact Assessment (EIA) follow-up verifiers such as monitoring agencies, checkers, supervisors and control officers are active on various construction sites across the world. There are, however, differing views on the value that these verifiers add and very limited learning in EIA has been drawn from independent verifiers. This paper aims to appraise how and to what extent independent EIA follow-up verifiers add value in major construction projects in the developing country context of South Africa. A framework for appraising the role of independent verifiers was established and four South African case studies were examined through a mixture ofmore » site visits, project document analysis, and interviews. Appraisal results were documented in the performance areas of: planning, doing, checking, acting, public participating and integration with other programs. The results indicate that independent verifiers add most value to major construction projects when involved with screening EIA requirements of new projects, allocation of financial and human resources, checking legal compliance, influencing implementation, reporting conformance results, community and stakeholder engagement, integration with self-responsibility programs such as environmental management systems (EMS), and controlling records. It was apparent that verifiers could be more creatively utilized in pre-construction preparation, providing feedback of knowledge into assessment of new projects, giving input to the planning and design phase of projects, and performance evaluation. The study confirms the benefits of proponent and regulator follow-up, specifically in having independent verifiers that disclose information, facilitate discussion among stakeholders, are adaptable and proactive, aid in the integration of EIA with other programs, and instill trust in EIA enforcement by conformance evaluation. Overall, the study provides insight on how to harness the learning opportunities arising from EIA follow-up through the appointment of independent verifiers. - Highlights: • A framework for appraising the role of independent verifiers is established. • The value added to EIA follow-up by independent verifiers in South Africa is documented. • Verifiers add most value when involved with screening, checking compliance, influencing decisions and community engagement. • Verifiers could be more creatively utilized in pre-construction preparation, giving feedback, and performance evaluation.« less

  1. Rule-Based Design of Plant Expression Vectors Using GenoCAD.

    PubMed

    Coll, Anna; Wilson, Mandy L; Gruden, Kristina; Peccoud, Jean

    2015-01-01

    Plant synthetic biology requires software tools to assist on the design of complex multi-genic expression plasmids. Here a vector design strategy to express genes in plants is formalized and implemented as a grammar in GenoCAD, a Computer-Aided Design software for synthetic biology. It includes a library of plant biological parts organized in structural categories and a set of rules describing how to assemble these parts into large constructs. Rules developed here are organized and divided into three main subsections according to the aim of the final construct: protein localization studies, promoter analysis and protein-protein interaction experiments. The GenoCAD plant grammar guides the user through the design while allowing users to customize vectors according to their needs. Therefore the plant grammar implemented in GenoCAD will help plant biologists take advantage of methods from synthetic biology to design expression vectors supporting their research projects.

  2. Final Jurisdictional Environmental Planning Technical Report. Peacekeeper in Minuteman Silos, 90th Strategic Missile Wing, F. E. Warren Air Force Base. Volume 2. Section 6.0 through 10.0

    DTIC Science & Technology

    1984-01-01

    QSALIfTY rN "PflD 3 Dist SL~ PREFACE The President has directed that the Air Force deploy the Peacekeeper missile system at a location near F.E...project construction. If selected, this agency should be established in 1984 prior to project-related inmigration. The responsible agency for...population as well as those unmet needs that, left unmet, will lead to major problems in the community’s well-being. This program should be implemented

  3. Study of the Human-Driven Mechanism of LUCC in the Shenfu Mining Area, NW of China

    NASA Astrophysics Data System (ADS)

    Wang, Tao

    2018-03-01

    Taking the Shenfu mining area, located in the northwest of China, as an example, temporal and spatial changes of land use/cover and its human-driven mechanism were analyzed based on the land use and MODIS NDVI data. The results show that: (1) by the implementation of the Grain for Green Project (GGP), the area of cultivated land decreased, and grassland increased. By the exploitation of coal and other resources and the development of social and economic levels, the area of construction land increased. (2) The vegetation cover level in the mining area significantly increased from 2000 to 2015, and the implementation of GGP and the increase of precipitation were the main reasons. (3) The driving force of land use to forest land and grassland could increase the level of vegetation cover, such as with the GGP, and the promotion of cultivated land and construction land will lead to the reduction of vegetation cover level, such as with urban expansion and mining area construction caused by population growth and industrial development.

  4. Understanding the relationship between safety culture dimensions and safety performance of construction projects through partial least square method

    NASA Astrophysics Data System (ADS)

    Latief, Yusuf; Machfudiyanto, Rossy A.; Arifuddin, Rosmariani; Yogiswara, Yoko

    2017-03-01

    Based on the data, 32% of accidental cases in Indonesia occurs on constructional sectors. It is supported by the data from Public Work and Housing Department that 27.43% of the implementation level of Safety Management System policy at construction companies in Indonesia remains unsafe categories. Moreover, there are dimensions of occupational safety culture formed including leadership, behavior, strategy, policy, process, people, safety cost, value and contract system. The aim of this study is to determine the model of an effective safety culture and know the relationship between dimensions in construction industry. The method used in this research was questionnaire survey which was distributed to the sample of construction companies either in a national private one in Indonesia. The result of this research is supposed to be able to illustrate the development of the relationship among occupational safety culture dimensions which have influences to the performances of constructional companies in Indonesia.

  5. Implementation of a safe-by-design approach in the development of new open pilot lines for the manufacture of carbon nanotube-based nano-enabled products

    NASA Astrophysics Data System (ADS)

    López de Ipiña, Jesús M.; Hernan, Angel; Cenigaonaindia, Xabier; Insunza, Mario; Florez, Sonia; Seddon, Richard; Vavouliotis, Antonios; Kostopoulos, Vasilios; Latko, Paulina; Durałek, Paweł; Kchit, Nadir

    2017-06-01

    The project PLATFORM (H2020, GA 646307) aims to develop three new pilot lines (PPLs) for the manufacture of carbon nanotube-based nano-enabled products (buckypapers, treated prepregs, doped veils), for the European aeronautics and automotive industries (a Technology Readiness Level 6 - TRL6 - is expected at the end of the project). The Machinery Directive 2006/42/EC (MD) - transposed into the respective national legislations - is the European regulatory framework for the design and construction of new machinery, as the future PPLs. PPLs are not required to comply with the provisions of the MD until they are put into service - expected in 2020, after project completion - but then, the MD will be fully applicable. In this regulatory context, the project PLATFORM is aligning the design of the PPLs according to the MD requirements, in order to facilitate the CE marking in 2020 (TRL9) and avoid potential economic costs associated with future re-adaptations or modifications needed to ensure compliance with the MD. This paper discusses the methodological approach followed by the project PLATFORM to integrate all the nanosafety aspects in the design of the PPLs, in order to achieve safe designs in conformity with the relevant Essential Health and Safety Requirements (EHSRs) of the MD. Since machinery must be designed and constructed taking into account the results of the risk assessment (RA), this paper describes the systematic and iterative approach for RA and risk reduction followed to eliminate hazards as far practicable and to adequately reduce risks by the implementation of protective measures. This process has been guided by the harmonized standards EN ISO 12100 and EN ISO 14123, taking the relevant phases of life cycle, expected uses and operation modes of the PPLs into account. A specific tool to guide the safe design of the PPLs and facilitate the RA process has also been produced by the project (PLATFORM - SbD toolkit).

  6. Energy Evaluation of a New Construction Pilot Community: Fresno, California

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burdick, A.; Poerschke, A.; Rapport, A.

    2014-06-01

    A new construction pilot community was constructed by builder-partner Wathen-Castanos Hybrid Homes (WCHH) based on a single occupied test house that was designed to achieve greater than 30% energy savings with respect to the House Simulation Protocols (Hendron, Robert; Engebrecht, Cheryn (2010). Building America House Simulation Protocols. Golden, CO: National Renewable Energy Laboratory). Builders face several key problems when implementing a whole-house systems integrated measures package (SIMP) from a single test house into multiple houses. Although a technical solution already may have been evaluated and validated in an individual test house, the potential exists for constructability failures at the communitymore » scale. This report addresses factors of implementation and scalability at the community scale and proposes methodologies by which community-scale energy evaluations can be performed based on results at the occupied test house level. Research focused on the builder and trade implementation of a SIMP and the actual utility usage in the houses at the community scale of production. Five occupants participated in this community-scale research by providing utility bills and information on occupancy and miscellaneous gas and electric appliance use for their houses. IBACOS used these utility data and background information to analyze the actual energy performance of the houses. Verification with measured data is an important component in predictive energy modeling. The actual utility bill readings were compared to projected energy consumption using BEopt with actual weather and thermostat set points for normalization.« less

  7. Reconstruction of gas distribution pipelines in MOZG in Poland using PE and PA pipes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borowicz, W.; Podziemski, T.; Kramek, E.

    1996-12-31

    MOZG--Warsaw Regional Gas Distribution Company was established in 1856. Now it is one of six gas distribution companies in Poland. Due to steadily increasing safety demands, some of the pipelines will need reconstruction. The majority of the substandard piping is located in urban areas. The company wanted to gain experiences in applying reconstruction technologies using two different plastic materials polyethylene and polyamide. They also wanted to assess the technical and economic practicalities of performing relining processes. A PE project--large diameter polyethylene relining (450 mm) conducted in Warsaw in 1994/95 and PA projects--relining using polyamide pipes, projects conducted in Radom andmore » in Warsaw during 1993 and 1994 are the most interesting and representative for this kind of works. Thanks to the experience obtained whilst carrying out these projects, reconstruction of old gas pipelines has become routine. Now they often use polyethylene relining of smaller diameters and they continue both construction and reconstruction of gas network using PA pipes. This paper presents the accumulated knowledge showing the advantages and disadvantages of applied methods. It describes project design and implementation with details and reports on the necessary preparation work, on site job organization and the most common problems arising during the construction works.« less

  8. Biomass power for rural development. Technical progress report, January 1, 1997--March 31, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-1, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-II of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  9. Biomass power for rural development. Technical progress report, April 1, 1997--June 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, E.

    Detailed task progress reports and schedules are provided for the DOE/USDA sponsored Biomass Power for Rural Development project. The focus of the project is on developing commercial energy crops for power generation by the year 2000. The New York based Salix Consortium project is a multi-partner endeavor, implemented in three stages. Phase-I, Final Design and Project Development, will conclude with the preparation of construction and/or operating permits, feedstock production plans, and contracts ready for signature. Field trials of willow (Salix) have been initiated at several locations in New York (Tully, Lockport, King Ferry, La Fayette, Massena, and Himrod) and co-firingmore » tests are underway at Greenidge Station (NYSEG) and Dunkirk Station (NMPC). Phase-H of the project will focus on scale-up of willow crop acreage, construction of co-firing facilities at Dunkirk Station (NMPC), and final modifications for Greenidge Station. Cofiring willow is also under consideration for GPU`s Seward Station where testing is under way. There will be an evaluation of the energy crop as part of the gasification trials occurring at BED`s McNeill power station. Phase-III will represent fullscale commercialization of the energy crop and power generation on a sustainable basis.« less

  10. Implementing Target Value Design.

    PubMed

    Alves, Thais da C L; Lichtig, Will; Rybkowski, Zofia K

    2017-04-01

    An alternative to the traditional way of designing projects is the process of target value design (TVD), which takes different departure points to start the design process. The TVD process starts with the client defining an allowable cost that needs to be met by the design and construction teams. An expected cost in the TVD process is defined through multiple interactions between multiple stakeholders who define wishes and others who define ways of achieving these wishes. Finally, a target cost is defined based on the expected profit the design and construction teams are expecting to make. TVD follows a series of continuous improvement efforts aimed at reaching the desired goals for the project and its associated target value cost. The process takes advantage of rapid cycles of suggestions, analyses, and implementation that starts with the definition of value for the client. In the traditional design process, the goal is to identify user preferences and find solutions that meet the needs of the client's expressed preferences. In the lean design process, the goal is to educate users about their values and advocate for a better facility over the long run; this way owners can help contractors and designers to identify better solutions. This article aims to inform the healthcare community about tools and techniques commonly used during the TVD process and how they can be used to educate and support project participants in developing better solutions to meet their needs now as well as in the future.

  11. Evaluation of implementation viability gap funding (VGF) policy on toll road investment in Indonesia

    NASA Astrophysics Data System (ADS)

    Mahani, Iris; Tamin, Rizal Z.; Pribadi, Krishna S.; Wibowo, Andreas

    2017-11-01

    VGF policy for toll road investment in Indonesia must be reviewed. Since 2012 the Government of Indonesia (GOI) has issued viability gap funding (VGF) policy for PPP infrastructure project through ministry of finance decision (PMK) No.223/2012. One of VGF purpose is to improve the financial feasibility. In the toll road investment in Indonesia, the implementation of this policy has some problems. This study aimed to evaluate the policy by seeking implementation constraints so can be given an alternative. This research was conducted qualitatively, included aspects of implementation process VGF policy. The analysis process is based on literature study and in-depth interviews to related parties include business entity, ministry of finance, and the ministry of public works, Indonesia Toll Road Authority (BPJT) and professional societies. The literature review conducted by reviewing existing policies and best practices in countries that already practice VGF. The conclusion of this study are 1) There is a conflict of regulation in viability gap funding (VGF) for toll road investment in Indonesia; 2) If Government of Indonesia (GOI) want implement construction grant as VGF, so the regulation must improve in time limited for submission and clearly define limited given in regulation; 3) If GOI want implement partial construction as VGF, so the regulation must be improve in guideline for submission and given.

  12. Composite fermions on a torus

    NASA Astrophysics Data System (ADS)

    Pu, Songyang; Wu, Ying-Hai; Jain, J. K.

    2017-11-01

    We achieve an explicit construction of the lowest Landau level (LLL) projected wave functions for composite fermions in the periodic (torus) geometry. To this end, we first demonstrate how the vortex attachment of the composite fermion (CF) theory can be accomplished in the torus geometry to produce the "unprojected" wave functions satisfying the correct (quasi)periodic boundary conditions. We then consider two methods for projecting these wave functions into the LLL. The direct projection produces valid wave functions but can be implemented only for very small systems. The more powerful and more useful projection method of Jain and Kamilla fails in the torus geometry because it does not preserve the periodic boundary conditions and thus takes us out of the original Hilbert space. We have succeeded in constructing a modified projection method that is consistent with both the periodic boundary conditions and the general structure of the CF theory. This method is valid for a large class of states of composite fermions, called "proper states," which includes the incompressible ground states at electron filling factors ν =n/2 p n +1 , their charged and neutral excitations, and also the quasidegenerate ground states at arbitrary filling factors of the form ν =ν/*2pν*+1 , where n and p are integers and ν* is the CF filling factor. Comparison with exact results known for small systems for the ground and excited states at filling factors ν =1 /3 , 2/5, and 3/7 demonstrates our LLL-projected wave functions to be extremely accurate representations of the actual Coulomb eigenstates. Our construction enables the study of large systems of composite fermions on the torus, thereby opening the possibility of investigating numerous interesting questions and phenomena.

  13. Scheduling the Remediation of Port Hope: Logistical and Regulatory Challenges of a Multiple Site Urban Remediation Project - 13119

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferguson Jones, Andrea; Lee, Angela; Palmeter, Tim

    2013-07-01

    The Port Hope Project is part of the larger CAN$1.28 billion Port Hope Area Initiative (PHAI), a community-based program for the development and implementation of a safe, local, long-term management solution for historic Low-Level Radioactive Waste (LLRW) in the Municipalities of Port Hope and Clarington, Ontario, Canada. Atomic Energy of Canada (AECL) is the Project Proponent, Public Works and Government Services (PWGSC) is managing the procurement of services and the MMM Group Limited - Conestoga Rovers and Associates Joint Venture (MMM-CRA Joint Venture) is providing detailed design and construction oversight and administration services for the Project. The Port Hope Projectmore » includes the construction of a long-term waste management facility (LTWMF) in the Municipality of Port Hope and the remediation of 18 (eighteen) large-scale LLRW, numerous small-scale sites still being identified and industrial sites within the Municipality. The total volume to be remediated is over one million cubic metres and will come from sites that include temporary storage sites, ravines, beaches, parks, private commercial and residential properties and vacant industrial sites all within the urban area of Port Hope. Challenges that will need to be overcome during this 10 year project include: - Requirements stipulated by the Environmental Assessment (EA) that affect Project logistics and schedule. - Coordination of site remediation with the construction schedule at the LTWMF. - Physical constraints on transport routes and at sites affecting production rates. - Despite being an urban undertaking, seasonal constrains for birds and fish (i.e., nesting and spawning seasons). - Municipal considerations. - Site-specific constraints. - Site interdependencies exist requiring consideration in the schedule. Several sites require the use of an adjacent site for staging. (authors)« less

  14. Bidding cost evaluation with fuzzy methods on building project in Jakarta

    NASA Astrophysics Data System (ADS)

    Susetyo, Budi; Utami, Tin Budi

    2017-11-01

    National construction companies today demanded to become more competitive to face increasingly competition. Every construction company especially the contractor must work better than ever. Ability to prepare cost of the work that represents the efficiency and effectiveness of the implementation of the work necessary to produce cost - competitive. The project is considered successful if the target meets the quality, cost and time. From the aspect of cost, the project has been designed in accordance with certain technical criteria to be taken into account based on standard costs. To ensure the cost efficiency of the bidding process carried out meet the rules of a fairly and competitive. The research objective is to formulate the proper way to compare several deals with the standard cost of the work. The fuzzy technique is used as a evaluation methods to decision making. The evaluation not merely based on the lowest prices. The methods is looking for the most valuable and reasonable prices. The comparison is conducted to determine the most cost-competitive and reasonable as the winner of the bidding.

  15. Guided Inquiry Learning With Sea Water Battery Project

    NASA Astrophysics Data System (ADS)

    Mashudi, A.

    2017-02-01

    Science learning process is expected to produce valuable product, innovative and real learning environment, and provide memorable learning experience. That orientation can be contained in Inquiry Based Learning. SMP N 4 Juwana is located close to the beach. That’s why, Sea Water Battery Project is very suitable to be applied in learning activity as an effort to fulfill the renewable energy based on local wisdom. This study aims to increase interest, activity and achievement of students. Learning implementation stage, namely : Constructing Sea Water Battery project, observation, group presentations, and feedback. Sea Water Battery is renewable energy battery from materials easily found around the learner. The materials used are copper plate as the anode, zinc plate as the cathode and sea water as the electrolyte. Average score of students Interest on the first cycle 76, while on the second cycle 85. Average score of students Activity on the first cycle 76 and on the second cycle 86. Average score of students achievement on the first cycle 75, while on the second cycle 84. This learning process gave nurturant effect for students to keep innovating and construct engineering technology for the future.

  16. Changing characteristics of land use and ecological service value in the water source region of the Middle Route of South-to-North Water Transfer Project

    NASA Astrophysics Data System (ADS)

    Tang, Jian; Zhai, Wenliang; Cao, Huiqun

    2017-08-01

    Research on changing characteristics of land use and ecological service value (ESV) can guide the regional land use planning and promote the rational use of environmental resources. On the basis of four phases of land-use data (2000, 2005, 2010 and 2015), this research analysed the changing characteristics of land use and ESV in the water source region of the Middle Route of South-to-North Water Transfer Project (SRMRP). The results showed that forest, grassland and cultivated land were the major land-use types in the SRMRP. During 2000∼2015, forest, grassland, farmland and wetland decreased. Construction land and bare land had increased, and the annual increase rates reached 3.6% and 8%, respectively. After the implementation of the water transfer project in 2003, water area was also increasing. The total ESV in the SRMRP is about 196 billion CNY, and mainly comes from the contributions of forest, grassland and farmland. During 2000∼2015, farmland shrinks leaded to the declines in value from supply service. With increasing in water and construction land, value from entertainment and cultural service increased. During the early stage of the water transfer project, value from regulation and support services increased due to the increase in water. With the decreasing in wetland and the increasing in construction land, the negative effects on the regulation and support services were increasing, and value from regulation and support services were therefore decreasing. During the process of resource exploitation and management, more attentions should be paid to the total control of construction land and wetland protection in the SRMRP.

  17. The effect of Problem/Project-Based Learning on a desired skill set for construction professionals

    NASA Astrophysics Data System (ADS)

    Sirotiak, Todd L.

    The purpose of this study was to investigate if a Problem/Project-Based Learning (PBL) approach can affect certain non-technical, "soft" skills of construction engineers. Such skills include leadership, adaptability, and stress management. In mixed design research, quantitative and qualitative data are assembled and analyzed collectively. For this study, two separate assessment tools were used for the quantitative portion, while open-ended written reflections and a partially closed-ended senior questionnaire were implemented for the qualitative portion. A hypothetical model was used to investigate certain soft skills based on prior research documenting need. Skills investigated were confidence, stress coping, leadership, communication skills, adaptability, and management skills. Descriptive statistics, open-ended final written reflections, and a partially closed-ended senior questionnaire were used to analyze the data. PBL is a process in which the students are challenged to develop realistic solutions on open, less structured, real world type problems. The results of this study performed with the combined count of nearly 60 students suggest that PBL can influence several soft skills of senior construction engineers. Specifically, these findings demonstrate the following: (a) PBL appears to affect students' soft skills; (b) students appear to recognize the realism and "real world" applicability that PBL brings to their skill development; and (c) the data suggest that the experience is holistic and offers opportunities for balanced growth in several ways. Some key competencies such as communication and leadership indicated significant enhancements. Although this study was limited to one academic year of the university's construction engineering program, it provides interesting insight to changes within the time period investigated. This study should be replicated in other construction engineering environments to investigate a larger population sample. In addition, industry, professional consultants, and academic entities are encouraged to review current learning methods to ensure that they are implementing the findings and methodology offered in this study.

  18. The PMS project: Poor man's supercomputer

    NASA Astrophysics Data System (ADS)

    Csikor, F.; Fodor, Z.; Hegedüs, P.; Horváth, V. K.; Katz, S. D.; Piróth, A.

    2001-02-01

    We briefly describe the Poor Man's Supercomputer (PMS) project carried out at Eötvös University, Budapest. The goal was to construct a cost effective, scalable, fast parallel computer to perform numerical calculations of physical problems that can be implemented on a lattice with nearest neighbour interactions. To this end we developed the PMS architecture using PC components and designed a special, low cost communication hardware and the driver software for Linux OS. Our first implementation of PMS includes 32 nodes (PMS1). The performance of PMS1 was tested by Lattice Gauge Theory simulations. Using pure SU(3) gauge theory or the bosonic part of the minimal supersymmetric extention of the standard model (MSSM) on PMS1 we obtained 3 / Mflops and 0.60 / Mflops price-to-sustained performance ratio for double and single precision operations, respectively. The design of the special hardware and the communication driver are freely available upon request for non-profit organizations.

  19. Efforts of a Kansas foundation to increase physical activity and improve health by funding community trails, 2012.

    PubMed

    Heinrich, Katie M; Lightner, Joseph; Oestman, Katherine B; Hughey, S Morgan; Kaczynski, Andrew T

    2014-11-26

    Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Sunflower's funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health.

  20. Modular Laboratories—Cost-Effective and Sustainable Infrastructure for Resource-Limited Settings

    PubMed Central

    Bridges, Daniel J.; Colborn, James; Chan, Adeline S. T.; Winters, Anna M.; Dengala, Dereje; Fornadel, Christen M.; Kosloff, Barry

    2014-01-01

    High-quality laboratory space to support basic science, clinical research projects, or health services is often severely lacking in the developing world. Moreover, the construction of suitable facilities using traditional methods is time-consuming, expensive, and challenging to implement. Three real world examples showing how shipping containers can be converted into modern laboratories are highlighted. These include use as an insectary, a molecular laboratory, and a BSL-3 containment laboratory. These modular conversions have a number of advantages over brick and mortar construction and provide a cost-effective and timely solution to offer high-quality, user-friendly laboratory space applicable within the developing world. PMID:25223943

  1. High-rise housing in the city of Samara: the first steps on the path to sustainable development

    NASA Astrophysics Data System (ADS)

    Vavilova, Tatiana Ya.; Makeeva, Elena Yu.

    2018-03-01

    This paper outlines theoretical background of high-rise housing and discusses its design experience. It particularly focuses on environmental, social and economic aspects which are among crucial sustainable development issues. The authors dwell upon the implementation of innovative solutions that meet principles and goals of sustainable development and take construction objects built in Samara (which is one of the largest metropolises in Russia) as an example. The research also investigates the quality of project designs and reveals techniques corresponding to the "green standards". It considers the issues of practicing high-rise building construction in specific urban conditions and identifies unresolved architectural problems.

  2. Photochemical Phenomenology Model for the New Millennium

    NASA Technical Reports Server (NTRS)

    Bishop, James; Evans, J. Scott

    2001-01-01

    The "Photochemical Phenomenology Model for the New Millennium" project tackles the issue of reengineering and extension of validated physics-based modeling capabilities ("legacy" computer codes) to application-oriented software for use in science and science-support activities. While the design and architecture layouts are in terms of general particle distributions involved in scattering, impact, and reactive interactions, initial Photochemical Phenomenology Modeling Tool (PPMT) implementations are aimed at construction and evaluation of photochemical transport models with rapid execution for use in remote sensing data analysis activities in distributed systems. Current focus is on the Composite Infrared Spectrometer (CIRS) data acquired during the CASSINI flyby of Jupiter. Overall, the project has stayed on the development track outlined in the Year 1 annual report and most Year 2 goals have been met. The issues that have required the most attention are: implementation of the core photochemistry algorithms; implementation of a functional Java Graphical User Interface; completion of a functional CORBA Component Model framework; and assessment of performance issues. Specific accomplishments and the difficulties encountered are summarized in this report. Work to be carried out in the next year center on: completion of testing of the initial operational implementation; its application to analysis of the CASSINI/CIRS Jovian flyby data; extension of the PPMT to incorporate additional phenomenology algorithms; and delivery of a mature operational implementation.

  3. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gales, S., E-mail: sydney.gales@eli-np.ro; Zamfir, N. V., E-mail: sydney.gales@eli-np.ro

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as themore » science, applications and future perspectives will be discussed.« less

  4. Current Space Projects of the Bolivarian Republic of Venezuela

    NASA Astrophysics Data System (ADS)

    Hernández, R.; Acevedo R.; Varela, F.; Otero, S.

    2014-06-01

    Since 2008, with the successful launch of the first Venezuelan telecommunication satellite VENESAT-1, the Bolivarian Republic of Venezuela became an active player in the international space sector aimed at using space science and technology as a powerful tool to promote the national development. Based on that, through the Bolivarian Agency for Space Activities (ABAE), Venezuela has been implemented several space projects such as the manufacturing and launch of the first Venezuelan remote sensing satellite, the construction of a design center for small satellite technologies, as well as research and development activities related with the estimation of the physical properties of the Earth. This paper presents a brief description of the current space projects that are being developed by Venezuela.

  5. Laser projection positioning of spatial contour curves via a galvanometric scanner

    NASA Astrophysics Data System (ADS)

    Tu, Junchao; Zhang, Liyan

    2018-04-01

    The technology of laser projection positioning is widely applied in advanced manufacturing fields (e.g. composite plying, parts location and installation). In order to use it better, a laser projection positioning (LPP) system is designed and implemented. Firstly, the LPP system is built by a laser galvanometric scanning (LGS) system and a binocular vision system. Applying Single-hidden Layer Feed-forward Neural Network (SLFN), the system model is constructed next. Secondly, the LGS system and the binocular system, which are respectively independent, are integrated through a datadriven calibration method based on extreme learning machine (ELM) algorithm. Finally, a projection positioning method is proposed within the framework of the calibrated SLFN system model. A well-designed experiment is conducted to verify the viability and effectiveness of the proposed system. In addition, the accuracy of projection positioning are evaluated to show that the LPP system can achieves the good localization effect.

  6. Deviation rectification for dynamic measurement of rail wear based on coordinate sets projection

    NASA Astrophysics Data System (ADS)

    Wang, Chao; Ma, Ziji; Li, Yanfu; Zeng, Jiuzhen; Jin, Tan; Liu, Hongli

    2017-10-01

    Dynamic measurement of rail wear using a laser imaging system suffers from random vibrations in the laser-based imaging sensor which cause distorted rail profiles. In this paper, a simple and effective method for rectifying profile deviation is presented to address this issue. There are two main steps: profile recognition and distortion calibration. According to the constant camera and projector parameters, efficient recognition of measured profiles is achieved by analyzing the geometric difference between normal profiles and distorted ones. For a distorted profile, by constructing coordinate sets projecting from it to the standard one on triple projecting primitives, including the rail head inner line, rail waist curve and rail jaw, iterative extrinsic camera parameter self-compensation is implemented. The distortion is calibrated by projecting the distorted profile onto the x-y plane of a measuring coordinate frame, which is parallel to the rail cross section, to eliminate the influence of random vibrations in the laser-based imaging sensor. As well as evaluating the implementation with comprehensive experiments, we also compare our method with other published works. The results exhibit the effectiveness and superiority of our method for the dynamic measurement of rail wear.

  7. JPRS Report, China 1989 Selected Provincial Economic Reports

    DTIC Science & Technology

    1989-08-23

    bumper harvest, and the supply of grain and the main nonstaple foods continued to increase. Upon implementing the responsibility system of linking...grain production topped 2,346,000 tons, surpassing the plan by 24,600 tons. Output of all of the main nonstaple foods exceeded the plan. Seeding...1988 were mainly urban infrastructure construction projects, such as the Fuxingmen to Bawangfen Subway and the Gaobeidian Sewage Treatment Plant

  8. The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling (BIM). Supplement 2 - BIM Implementation Guide for Military Construction (MILCON) Projects Using the Bentley Platform

    DTIC Science & Technology

    2012-11-01

    Building Information Modeling ( BIM ...12-2, Supplement 2 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 2 – BIM ...39180 ERDC SR-12-2, Supplement 2 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac-

  9. The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling (BIM). Supplement 1- BIM Implementation Guide for Military Construction (MILCON) Projects Using the Autodesk Platform

    DTIC Science & Technology

    2012-11-01

    Building Information Modeling ( BIM ...12-2, Supplement 1 November 2012 The US Army Corps of Engineers Roadmap for Life-Cycle Building Information Modeling ( BIM ) Supplement 1 – BIM ...ERDC SR-12-2, Supplement 1 (November 2012) ii Abstract Building Information Modeling ( BIM ) technology has rapidly gained ac- ceptance throughout

  10. Critical elements and lessons learnt from the implementation of an RFID-enabled healthcare management system in a medical organization.

    PubMed

    Ting, S L; Kwok, S K; Tsang, Albert H C; Lee, W B

    2011-08-01

    Healthcare services are complex and life-critical. One mistake in any procedure may lead to irremediable consequences; numerous researchers, thus, introduce information and communication technology to improve quality of services and enhance patient safety by reducing the medical errors. Radio frequency identification (RFID) is considered as one of the emerging tool assist in meeting the challenges of the present situation. In recent years, RFID has been applied in medical organizations for the purpose of managing and tracking medical equipment, monitoring and identifying patients, ensuring that the right medication is given to the right patient, and preventing the use of counterfeit medicine. However, most of the existing literature focuses on demonstrating how RFID can benefit the healthcare industry, whereas little attention has been given to the management issues involved in constructing an RFID project in medical organizations. In this paper, an exploratory case study is conducted in a medical organization to illustrate the development framework and critical issues that should be taken into consideration in the preparation, implementation and maintenance stage of constructing such a project. All the experiences and results discussed in this paper offer valuable and useful insights to steer those who would like to start their journey using RFID in medical organizations.

  11. Building integral projection models: a user's guide

    PubMed Central

    Rees, Mark; Childs, Dylan Z; Ellner, Stephen P; Coulson, Tim

    2014-01-01

    In order to understand how changes in individual performance (growth, survival or reproduction) influence population dynamics and evolution, ecologists are increasingly using parameterized mathematical models. For continuously structured populations, where some continuous measure of individual state influences growth, survival or reproduction, integral projection models (IPMs) are commonly used. We provide a detailed description of the steps involved in constructing an IPM, explaining how to: (i) translate your study system into an IPM; (ii) implement your IPM; and (iii) diagnose potential problems with your IPM. We emphasize how the study organism's life cycle, and the timing of censuses, together determine the structure of the IPM kernel and important aspects of the statistical analysis used to parameterize an IPM using data on marked individuals. An IPM based on population studies of Soay sheep is used to illustrate the complete process of constructing, implementing and evaluating an IPM fitted to sample data. We then look at very general approaches to parameterizing an IPM, using a wide range of statistical techniques (e.g. maximum likelihood methods, generalized additive models, nonparametric kernel density estimators). Methods for selecting models for parameterizing IPMs are briefly discussed. We conclude with key recommendations and a brief overview of applications that extend the basic model. The online Supporting Information provides commented R code for all our analyses. PMID:24219157

  12. Load-bearing masonry system adoption and performance: A case study of construction company in a developing country

    NASA Astrophysics Data System (ADS)

    Ramli, Nor Azlinda; Abdullah, Che Sobry; Nawi, Mohd Nasrun Mohd; Bahaudin, Ahmad Yusni

    2016-08-01

    This study addresses the factors that influence the adoption of load-bearing masonry (LBM) system. A case study of the load-bearing masonry (LBM) system adoption is conducted through an interview to explore the situation of the technology adoption in a construction company. The finding indicates the factors influence the adoption of LBM system for the construction company are: organizational resources, usefulness, less maintenance, reduce construction time and cost. From the findings, these factors consistent with previous literature. Furthermore, the performance of the company was measured by looking into the financial and non-financial aspects. The LBM system brings good performance as it increased the profits of the company, a good quality of product and attracts more demand from customers. Thus, these factors should be considered for the other companies that are interested in implementing the LBM system in their projects.

  13. Virtually Out of This World!

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Ames Research Center granted Reality Capture Technologies (RCT), Inc., a license to further develop NASA's Mars Map software platform. The company incorporated NASA#s innovation into software that uses the Virtual Plant Model (VPM)(TM) to structure, modify, and implement the construction sites of industrial facilities, as well as develop, validate, and train operators on procedures. The VPM orchestrates the exchange of information between engineering, production, and business transaction systems. This enables users to simulate, control, and optimize work processes while increasing the reliability of critical business decisions. Engineers can complete the construction process and test various aspects of it in virtual reality before building the actual structure. With virtual access to and simulation of the construction site, project personnel can manage, access control, and respond to changes on complex constructions more effectively. Engineers can also create operating procedures, training, and documentation. Virtual Plant Model(TM) is a trademark of Reality Capture Technologies, Inc.

  14. Enhancing Scientific Inquiry Literacy of Prospective Biology Teachers through Inquiry Lab Project in Microbiology

    NASA Astrophysics Data System (ADS)

    Kusnadi, K.; Rustaman, N. Y.; Redjeki, S.; Aryantha, I. N. P.

    2017-09-01

    The implementation of the inquiry laboratory based project to enhance scientific inquiry literacy of prospective biology teachers in Microbiology course has been done. The inquiry lab based project was designed by three stages were debriefing of basic microbiology lab skills, guided inquiry and free inquiry respectively. The Study was quasi experimental with control group pretest-posttest design. The subjects were prospective biology teachers consists of 80 students. The scientific inquiry literacy instrument refers to ScInqLiT by Wenning. The results showed that there was significant difference of scientific inquiry literacy posttest scores between experiment and control (α 0,05) and was obtained N-gain score was 0.49 (medium) to experiment and 0.24 (low) to control. Based on formative assessment showed that development of student’s scientific attitude, research and microbiology lab skills during conducting project were increased. Student’s research skills especially in identification of variables, constructing a hypothesis, communicating and concluding were increased. During implementation of inquiry project also showed that they carried out mind and hands-on and so collaborative group investigation lab activities. Our findings may aid in reforming higher-education, particularly in microbiology laboratory activities to better promote scientific inquiry literacy, scientific attitude, research and laboratory skills.

  15. An improved robust buffer allocation method for the project scheduling problem

    NASA Astrophysics Data System (ADS)

    Ghoddousi, Parviz; Ansari, Ramin; Makui, Ahmad

    2017-04-01

    Unpredictable uncertainties cause delays and additional costs for projects. Often, when using traditional approaches, the optimizing procedure of the baseline project plan fails and leads to delays. In this study, a two-stage multi-objective buffer allocation approach is applied for robust project scheduling. In the first stage, some decisions are made on buffer sizes and allocation to the project activities. A set of Pareto-optimal robust schedules is designed using the meta-heuristic non-dominated sorting genetic algorithm (NSGA-II) based on the decisions made in the buffer allocation step. In the second stage, the Pareto solutions are evaluated in terms of the deviation from the initial start time and due dates. The proposed approach was implemented on a real dam construction project. The outcomes indicated that the obtained buffered schedule reduces the cost of disruptions by 17.7% compared with the baseline plan, with an increase of about 0.3% in the project completion time.

  16. Awareness of BIM adoption in Brunei

    NASA Astrophysics Data System (ADS)

    Rahman, Md Motiar

    2017-09-01

    Building Information Modelling (BIM) is getting increased attention day-by-day due to its many benefits, including clash detection, collaboration between contract parties, visualization future structure, optimized schedule and project control, waste control, design documentation, and harmonized facilities management. As such, many countries have already adopted BIM, and many other countries are exploring the potential of adopting it. However, it is still relatively new and unknown to some other countries like Brunei. This study was therefore undertaken to generate and/or gauge the awareness of Brunei construction industry participants, targeting adoption of BIM, through a structured questionnaire survey. Responses from 90 industry participants reveal that Brunei Construction industry is not well aware of BIM, lack the required technical knowledge and application in construction, and cost involvement. They are unsure about the potential benefits and barriers to implementing BIM. However, respondents are hopeful that BIM can bring the required changes in construction, willing to adopt BIM, expects cliental support with initial investment for its adoption, and believe that BIM is the future of construction project information management. On the whole, private sector was seen to be more aware on BIM than public sector. The study outcomes are expected to provide the policy makers a first-hand information on the industry awareness on BIM, which in turn help them for further exploration / examination and to design any action plan and guidelines for BIM adoption.

  17. Space-planning and structural solutions of low-rise buildings: Optimal selection methods

    NASA Astrophysics Data System (ADS)

    Gusakova, Natalya; Minaev, Nikolay; Filushina, Kristina; Dobrynina, Olga; Gusakov, Alexander

    2017-11-01

    The present study is devoted to elaboration of methodology used to select appropriately the space-planning and structural solutions in low-rise buildings. Objective of the study is working out the system of criteria influencing the selection of space-planning and structural solutions which are most suitable for low-rise buildings and structures. Application of the defined criteria in practice aim to enhance the efficiency of capital investments, energy and resource saving, create comfortable conditions for the population considering climatic zoning of the construction site. Developments of the project can be applied while implementing investment-construction projects of low-rise housing at different kinds of territories based on the local building materials. The system of criteria influencing the optimal selection of space-planning and structural solutions of low-rise buildings has been developed. Methodological basis has been also elaborated to assess optimal selection of space-planning and structural solutions of low-rise buildings satisfying the requirements of energy-efficiency, comfort and safety, and economical efficiency. Elaborated methodology enables to intensify the processes of low-rise construction development for different types of territories taking into account climatic zoning of the construction site. Stimulation of low-rise construction processes should be based on the system of approaches which are scientifically justified; thus it allows enhancing energy efficiency, comfort, safety and economical effectiveness of low-rise buildings.

  18. Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry

    2003-06-09

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less

  19. Examining Equivalence of Concepts and Measures in Diverse Samples

    PubMed Central

    Choi, Yoonsun; Abbott, Robert D.; Catalano, Richard F.; Bliesner, Siri L.

    2012-01-01

    While there is growing awareness for the need to examine the etiology of problem behaviors across cultural, racial, socioeconomic, and gender groups, much research tends to assume that constructs are equivalent and that the measures developed within one group equally assess constructs across groups. The meaning of constructs, however, may differ across groups or, if similar in meaning, measures developed for a given construct in one particular group may not be assessing the same construct or may not be assessing the construct in the same manner in other groups. The aims of this paper were to demonstrate a process of testing several forms of equivalence including conceptual, functional, item, and scalar using different methods. Data were from the Cross-Cultural Families Project, a study examining factors that promote the healthy development and adjustment of children among immigrant Cambodian and Vietnamese families. The process described in this paper can be implemented in other prevention studies interested in diverse groups. Demonstrating equivalence of constructs and measures prior to group comparisons is necessary in order to lend support of our interpretation of issues such as ethnic group differences and similarities. PMID:16845592

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, K.; Gates, C.

    This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about ½ of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gates, C.; Neuhauser, K.

    This research project evaluates post-retrofit performance measurements, energy use data and construction costs for 13 projects that participated in the National Grid Deep Energy Retrofit Pilot program. The projects implemented a package of measures defined by performance targets for building enclosure components and building enclosure air tightness. Nearly all of the homes reached a post-retrofit air tightness result of 1.5 ACH 50. Homes that used the chainsaw retrofit technique along with roof insulation, and wall insulation applied to the exterior had the best air tightness results and the lowest heating and cooling source energy use. Analysis of measure costs andmore » project objectives yielded a categorization of costs relative to energy performance objectives. On average about 1/2 of the energy-related measure costs correspond primarily to energy-related objectives, and 20% of energy-related measure costs relate primarily to non-energy objectives.« less

  2. Development and Application of New Quality Model for Software Projects

    PubMed Central

    Karnavel, K.; Dillibabu, R.

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects. PMID:25478594

  3. Development and application of new quality model for software projects.

    PubMed

    Karnavel, K; Dillibabu, R

    2014-01-01

    The IT industry tries to employ a number of models to identify the defects in the construction of software projects. In this paper, we present COQUALMO and its limitations and aim to increase the quality without increasing the cost and time. The computation time, cost, and effort to predict the residual defects are very high; this was overcome by developing an appropriate new quality model named the software testing defect corrective model (STDCM). The STDCM was used to estimate the number of remaining residual defects in the software product; a few assumptions and the detailed steps of the STDCM are highlighted. The application of the STDCM is explored in software projects. The implementation of the model is validated using statistical inference, which shows there is a significant improvement in the quality of the software projects.

  4. Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bronson, James P.; Duke, Bill; Loffink, Ken

    2008-12-30

    In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival ofmore » migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.« less

  5. A Step Towards Conservation for Interior Alaska Tribes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kimberly Carlo

    2012-07-07

    This project includes a consortium of tribes. The tribes include Hughes (representing the consortium) Birch Creek, Huslia, and Allakaket. The project proposed by Interior Regional Housing Authority (IRHA) on behalf of the villages of Hughes, Birch Creek, Huslia and Allakaket is to develop an energy conservation program relevant to each specific community, educate tribe members and provide the tools to implement the conservation plan. The program seeks to achieve both energy savings and provide optimum energy requirements to support each tribe's mission. The energy management program will be a comprehensive program that considers all avenues for achieving energy savings, frommore » replacing obsolete equipment, to the design and construction of energy conservation measures, the implementation of energy saving operation and maintenance procedures, the utilization of a community-wide building energy management system, and a commitment to educating the tribes on how to decrease energy consumption. With the implementation of this program and the development of an Energy Management Plan, these communities can then work to reduce the high cost of living in rural Alaska.« less

  6. Involvement of the US Department of Defense in Civilian Assistance, Part I: a quantitative description of the projects funded by the Overseas Humanitarian, Disaster, and Civic Aid Program.

    PubMed

    Bourdeaux, Margaret Ellis; Lawry, Lynn; Bonventre, Eugene V; Burkle, Frederick M

    2010-03-01

    To review the history and goals of the US Department of Defense's largest civilian assistance program, the Overseas Humanitarian, Disaster and Civic Aid Program and to describe the number, geographic regions, years, key words, countries, and types of projects carried out under this program since 2001. Using the program's central database, we reviewed all approved projects since 2001 and tabulated them by year, combatant command, country, and key word. We also reviewed the project descriptions of projects funded between January 1, 2006, and February 9, 2008, and examined how their activities varied by combatant command and year. Of the 5395 projects in the database, 2097 were funded. Projects took place in more than 90 countries, with Southern, Pacific, and Africa Command hosting the greatest number. The most common types of projects were school, health, disaster response, and water infrastructure construction, and disaster-response training. The "global war on terror" was the key word most frequently tagged to project descriptions. Project descriptions lacked stated goals as well as implementation and coordination strategies with potential partners, and did not report outcome or impact indicators. The geographic reach of the program is vast and projects take place in a wide variety of public sectors. Yet their security and civilian assistance value remains unclear given the lack of stated project goals, implementation strategies, or measures of effectiveness. To facilitate transparency and policy discussion, we recommend project proposals include hypotheses as to how they will enhance US security, their relevance to the public sector they address, and outcome and impact indicators that can assess their value and effectiveness.

  7. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    NASA Astrophysics Data System (ADS)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  8. Whole Building Efficiency for Whole Foods: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deru, M.; Doebber, I.; Hirsch, A.

    2013-02-01

    The National Renewable Energy Laboratory partnered with Whole Foods Market under the Commercial Building Partnership (CBP) program to design and implement a new store in Raleigh, North Carolina. The result was a design with a predicted energy savings of 40% over ASHRAE Standard 90.1-2004, and 25% energy savings over their standard design. Measured performance of the as-built building showed that the building did not achieve the predicted performance. A detailed review of the project several months after opening revealed a series of several items in construction and controls items that were not implemented properly and were not fully corrected inmore » the commissioning process.« less

  9. The method of selecting an integrated development territory for the high-rise unique constructions

    NASA Astrophysics Data System (ADS)

    Sheina, Svetlana; Shevtsova, Elina; Sukhinin, Alexander; Priss, Elena

    2018-03-01

    On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.

  10. Evaluation of the varying Naturally Occurring Asbestos mitigation measures at School and Commercial construction projects in California

    NASA Astrophysics Data System (ADS)

    Kalika, S.

    2012-12-01

    In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.

  11. Inquiring minds: Case studies of two middle school science teachers as they include inquiry and graphing in their curricula

    NASA Astrophysics Data System (ADS)

    Scarano, Grace Hotchkiss

    2000-10-01

    Current reform documents in science and mathematics call for teachers to include inquiry and data analysis in their teaching. This interpretive quasi-ethnographic case study examined two middle school science teachers as they planned and implemented inquiry and graphing in their science curricula. The focus question for this research was: What are middle school science teachers' experiences as they include graphing and inquiry-based student research projects in their curricula? How is teaching these areas different from usual teaching? The research examined two teachers teaching their favorite unit, parts of other familiar units, graphing, and student inquiry. Four main types of data were gathered: (1) observations of teachers' instruction, (2) interviews and meetings with the teachers, (3) curricular artifacts, and (4) questionnaires and other written material. The study took place over a seven-month period. The findings revealed that these two teachers had different ideologies of schooling and that these ideologies shaped the teachers' planning and implementation of their usual content as well as graphing and inquiry. One teacher's ideology was technical, and the other's was constructive. Six themes emerged as salient features of their teaching: (1) the role of developing a vision for curricular implementation, (2) curricular decisions: internal and external authority, (3) views of knowing and learning, (4) perceptions of the nature of science, (5) attending to a personal concern in teaching, and (6) reflection. The textures of these themes varied between the two teachers, and formed a coherent yet dynamic system within which each teacher maneuvered. This study found that both teachers found it challenging to include inquiry in their curricula, even though both had attended workshops designed to help teachers use student inquiry. The constructive teacher's implementation was more in line with the notions that are central to constructivism and current non-traditional views of the nature of science than was that of the technical teacher. The teacher with a technical ideology relied on the scientific method to organize student projects and implemented inquiry as a technique to increase student-centered work. It is proposed that teachers with technical ideologies need to undergo an ideological shift toward constructive ideologies of schooling in order to teach graphing and inquiry in ways that are aligned with current reform efforts.

  12. Analysis of Factors Influencing Building Refurbishment Project Performance

    NASA Astrophysics Data System (ADS)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  13. Lessons learned from the integration of local stakeholders in water management approaches in central-northern Namibia

    NASA Astrophysics Data System (ADS)

    Jokisch, A.; Urban, W.

    2012-04-01

    Water is the main limiting factor for economic and agricultural development in central-northern Namibia, where approximately 50% of the Namibian population lives on less than 10% of the country's surface area. The climate in the region can be characterized as semi-arid, with distinctive rainy and dry seasons and an average precipitation of 470 mm/a. Central-northern Namibia can furthermore be characterized by a system of so-called Oshanas, very shallow ephemeral river streams which drain the whole region from north to south towards the Etosha-Saltpan. Water quality within these ephemeral river streams rapidly decreases towards the end of the dry season due to high rates of evaporation (2,700 mm/a) which makes the water unsuitable for human consumption and in certain times of the year also for irrigation purposes. Other local water resources are scarce or of low quality. Therefore, the local water supply is mainly secured via a pipeline scheme which is fed by the Namibian-Angolan border river Kunene. Within the research project CuveWaters - Integrated Water Resources Management in central-northern Namibia different small scale water supply and sanitation technologies are implemented and tested as part of the projects multi-resource mix. The aim is to decentralize the regional water supply and make it more sustainable especially in the face of climate change. To gain understanding and to create ownership within the local population for the technologies implemented, stakeholder participation and capacity development are integral parts of the project. As part of the implementation process of rainwater harvesting and water harvesting from ephemeral river streams, pilot plants for the storage of water were constructed with the help of local stakeholders who will also be the beneficiaries of the pilot plants. The pilot plants consist of covered storage tanks and infrastructure for small scale horticultural use of the water stored. These small scale horticultural activities enable the users of the pilot plants to improve their standard of living by producing vegetables for self-consumption or for selling them on local markets. Irrigation for small-scale horticulture was virtually unknown in the region prior to the project which makes intense training for the local users necessary. This paper summarizes the participative process of finding a pilot village and a suitable location along the ephemeral river stream as well as the process of selecting people from the local community for construction and for the operation of the pilot plant. According to the demand-responsive approach of the CuveWaters project, local stakeholders were involved in all these processes. Tools for participation used are workshops and interviews with local stakeholders and the integration of the users in all decision-making processes as well as in construction, maintenance, operation and monitoring.

  14. [Case Study] CityCenter and Cosmopolitan Construction Projects, Las Vegas, Nevada: lessons learned from the use of multiple sources and mixed methods in a safety needs assessment.

    PubMed

    Gittleman, Janie L; Gardner, Paige C; Haile, Elizabeth; Sampson, Julie M; Cigularov, Konstantin P; Ermann, Erica D; Stafford, Pete; Chen, Peter Y

    2010-06-01

    The present study describes a response to eight tragic deaths over an eighteen month times span on a fast track construction project on the largest commercial development project in U.S. history. Four versions of a survey were distributed to workers, foremen, superintendents, and senior management. In addition to standard Likert-scale safety climate scale items, an open-ended item was included at the end of the survey. Safety climate perceptions differed by job level. Specifically, management perceived a more positive safety climate as compared to workers. Content analysis of the open-ended item was used to identify important safety and health concerns which might have been overlooked with the qualitative portion of the survey. The surveys were conducted to understand workforce issues of concern with the aim of improving site safety conditions. Such efforts can require minimal investment of resources and time and result in critical feedback for developing interventions affecting organizational structure, management processes, and communication. The most important lesson learned was that gauging differences in perception about site safety can provide critical feedback at all levels of a construction organization. Implementation of multi-level organizational perception surveys can identify major safety issues of concern. Feedback, if acted upon, can potentially result in fewer injuries and fatal events. (c) 2010 Elsevier Ltd. All rights reserved.

  15. Theoretical framework of the causes of construction time and cost overruns

    NASA Astrophysics Data System (ADS)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  16. Back-Up Generator Facility and Associated Project Environmental Assessment Dyess Air Force Base, Texas

    DTIC Science & Technology

    2007-07-01

    waste, or solid waste management would be expected with implementation of the no-action alternative. Soils and Water. Impacts to soils and water...resources would be negligible. Construction would disturb about 2.5 acres, but best management practices such as silt fencing and soil surface watering...Intergovernmental Coordination for Environmental Planning tpy U.S. tons per year United States IWMP Integrated Waste Management Plan USACE United States

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuhauser, K.

    Through discussion of five case studies (test homes), this project evaluates strategies to elevate the performance of existing homes to a level commensurate with best-in-class implementation of high-performance new construction homes. The test homes featured in this research activity participated in Deep Energy Retrofit (DER) Pilot Program sponsored by the electric and gas utility National Grid in Massachusetts and Rhode Island. Building enclosure retrofit strategies are evaluated for impact on durability and indoor air quality in addition to energy performance.

  18. Final Environmental Assessment Airfield Storm Drainage System Repair Joint Base Andrews-Naval Air Facility Washington, MD

    DTIC Science & Technology

    2015-06-01

    sediment control plan during project implementation would be expected to minimize any adverse effects on resident fish species during construction. In... Effective August 8, 2007, under the authority of the Endangered Species Act of 1973, as amended, the U.S. Fish and Wildlife Service (Service) removed...of storm sewer pipe and 122 manholes of the airfield stormwater drainage network. Summary of Anticipated Environmental Effects Associated with the

  19. Financing future power generation in Italy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esposito, P.

    1998-07-01

    Under Italian law, independent power generation fueled by renewable and so-called ``assimilated'' sources must be given incentives. To implement this provision, a resolution known as ``CIP 6'' and a decree setting forth the procedure to sell such electricity to ENEL were issued. CIP 6 has recently been revoked and new incentives have been announced. In the meantime, CIP 6 continues to apply to various projects which have been approved but not yet constructed.

  20. The Transforming Maternity Care Project: Goals, Methods, and Outcomes of a National Maternity Care Policy Initiative, With Construction of a Theoretical Model to Explain the Process

    DTIC Science & Technology

    2011-03-21

    to and receive comprehensive high-quality, high-value reproductive health and maternity care. • Comprehensive health care reform strategies...and its implementation, ensure that access to comprehensive, high-quality reproductive health and maternity care services are essential benefits for... Reproductive Health, Centers for Disease Control and Prevention Stakeholder Workgroup Consumers and their Advocates Chair: Judy Norsigian

  1. Predicting implementation from organizational readiness for change: a study protocol

    PubMed Central

    2011-01-01

    Background There is widespread interest in measuring organizational readiness to implement evidence-based practices in clinical care. However, there are a number of challenges to validating organizational measures, including inferential bias arising from the halo effect and method bias - two threats to validity that, while well-documented by organizational scholars, are often ignored in health services research. We describe a protocol to comprehensively assess the psychometric properties of a previously developed survey, the Organizational Readiness to Change Assessment. Objectives Our objective is to conduct a comprehensive assessment of the psychometric properties of the Organizational Readiness to Change Assessment incorporating methods specifically to address threats from halo effect and method bias. Methods and Design We will conduct three sets of analyses using longitudinal, secondary data from four partner projects, each testing interventions to improve the implementation of an evidence-based clinical practice. Partner projects field the Organizational Readiness to Change Assessment at baseline (n = 208 respondents; 53 facilities), and prospectively assesses the degree to which the evidence-based practice is implemented. We will conduct predictive and concurrent validities using hierarchical linear modeling and multivariate regression, respectively. For predictive validity, the outcome is the change from baseline to follow-up in the use of the evidence-based practice. We will use intra-class correlations derived from hierarchical linear models to assess inter-rater reliability. Two partner projects will also field measures of job satisfaction for convergent and discriminant validity analyses, and will field Organizational Readiness to Change Assessment measures at follow-up for concurrent validity (n = 158 respondents; 33 facilities). Convergent and discriminant validities will test associations between organizational readiness and different aspects of job satisfaction: satisfaction with leadership, which should be highly correlated with readiness, versus satisfaction with salary, which should be less correlated with readiness. Content validity will be assessed using an expert panel and modified Delphi technique. Discussion We propose a comprehensive protocol for validating a survey instrument for assessing organizational readiness to change that specifically addresses key threats of bias related to halo effect, method bias and questions of construct validity that often go unexplored in research using measures of organizational constructs. PMID:21777479

  2. Optimizing and controlling earthmoving operations using spatial technologies

    NASA Astrophysics Data System (ADS)

    Alshibani, Adel

    This thesis presents a model designed for optimizing, tracking, and controlling earthmoving operations. The proposed model utilizes, Genetic Algorithm (GA), Linear Programming (LP), and spatial technologies including Global Positioning Systems (GPS) and Geographic Information Systems (GIS) to support the management functions of the developed model. The model assists engineers and contractors in selecting near optimum crew formations in planning phase and during construction, using GA and LP supported by the Pathfinder Algorithm developed in a GIS environment. GA is used in conjunction with a set of rules developed to accelerate the optimization process and to avoid generating and evaluating hypothetical and unrealistic crew formations. LP is used to determine quantities of earth to be moved from different borrow pits and to be placed at different landfill sites to meet project constraints and to minimize the cost of these earthmoving operations. On the one hand, GPS is used for onsite data collection and for tracking construction equipment in near real-time. On the other hand, GIS is employed to automate data acquisition and to analyze the collected spatial data. The model is also capable of reconfiguring crew formations dynamically during the construction phase while site operations are in progress. The optimization of the crew formation considers: (1) construction time, (2) construction direct cost, or (3) construction total cost. The model is also capable of generating crew formations to meet, as close as possible, specified time and/or cost constraints. In addition, the model supports tracking and reporting of project progress utilizing the earned-value concept and the project ratio method with modifications that allow for more accurate forecasting of project time and cost at set future dates and at completion. The model is capable of generating graphical and tabular reports. The developed model has been implemented in prototype software, using Object-Oriented Programming, Microsoft Foundation Classes (MFC), and has been coded using visual C++ V.6. Microsoft Access is employed as database management system. The developed software operates in Microsoft windows' environment. Three example applications were analyzed to validate the development made and to illustrate the essential features of the developed model.

  3. Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wiehagen, J.; Del Bianco, M.; Mallay, D.

    2015-05-01

    In the fall of 2010, a multiyear pilot energy efficiency retrofit project was undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 home cooperative of circa 1930 and 1940 homes in Greenbelt, Maryland. GHI established this pilot project to serve as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy efficiency improvements to the building envelope and mechanical equipment. It presents a unique opportunity to evaluate and prioritize the wide-range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressingmore » the complex interactions between benefits, trade-offs, construction methods, project management implications, realistic upfront costs, financing, and other considerations, serves as a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner. The pilot project focused on identifying the added costs and energy savings benefits of improvements.« less

  4. Field Review of Fish Habitat Improvement Projects in Central Idaho.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief periodmore » for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.« less

  5. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...

  6. International academic program in technologies of light-water nuclear reactors. Phases of development and implementation

    NASA Astrophysics Data System (ADS)

    Geraskin, N. I.; Glebov, V. B.

    2017-01-01

    The results of implementation of European educational projects CORONA and CORONA II dedicated to preserving and further developing nuclear knowledge and competencies in the area of technologies of light-water nuclear reactors are analyzed. Present article addresses issues of design and implementation of the program for specialized training in the branch of technologies of light-water nuclear reactors. The systematic approach has been used to construct the program for students of nuclear specialties, which corresponding to IAEA standards and commonly accepted nuclear principles recognized in the European Union. Possibilities of further development of the international cooperation between countries and educational institutions are analyzed. Special attention is paid to e-learning/distance training, nuclear knowledge preservation and interaction with European Nuclear Education Network.

  7. Oak Grove Fork Habitat Improvement Project, 1988 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bettin, Scott

    The Lower Oak Grove Fork of the Clackamas River is a fifth-order tributary of the Clackamas River drainage supporting depressed runs of coho and chinook salmon, and summer and winter steelhead. Habitat condition rating for the Lower Oak Grove is good, but smelt production estimates are below the average for Clackamas River tributaries. Limiting factors in the 3.8 miles of the Lower Oak Grove supporting anadromous fish include an overall lack of quality spawning and rearing habitat. Beginning in 1986. measures to improve fish habitat in the Lower Oak Grove were developed in coordination with the Oregon Department of Fishmore » and Wildlife (ODF&W) and Portland General Electric (PGE) fisheries biologists. Prior to 1986, no measures had been applied to the stream to mitigate for PGE's storage and regulation of flows in the Oak Grove Fork (Timothy Lake, Harriet Lake). Catchable rainbow trout are stocked by ODF&W two or three times a year during the trout fishing season in the lowermost portion of the Oak Grove Fork near two Forest Service campgrounds (Ripplebrook and Rainbow). The 1987 field season marked the third year of efforts to improve fish habitat of the Lower Oak Grove Fork and restore anadromous fish production. The efforts included the development of an implementation plan for habitat improvement activities in the Lower Oak Grove Fork. post-project monitoring. and maintenance of the 1986 improvement structures. No new structures were constructed or placed in 1987. Fiscal year 1988 brought a multitude of changes which delayed implementation of plans developed in 1987. The most prominent change was the withdrawal of the proposed Spotted Owl Habitat Area (SOHA) which overlapped the Oak Grove project implementation area. Another was the change in the Forest Service biologist responsible for implementation and design of this project.« less

  8. [Master trainer concept "structured specialist further education" : A joint project of the German Professional Associations of Internal Medicine, Surgeons and Orthopedic/Trauma Surgeons].

    PubMed

    Siebolds, M; Ansorg, J; Dittmar, R; Hennes, N; Radau, T; Ruff, S; Denkinger, M D

    2017-10-01

    The quality requirements in the practice of postgradual medical further education below the normal level of the further education regulations is a barely developed scientific field in Germany. A systematic use of internationally accepted scientific evidence barely exists. This research and development project was initiated in 2001 in order to be able to implement a practical but evidence-based model compatible with the existing structure of postgradual medical education. This project has been supported since 2013 by the Professional Associations of Internal Medicine (BDI), Surgeons (BDC) and Orthopedic and Trauma surgeons (BVOU). The development phase of this complex intervention was based on three stages involving stakeholder interviews from relevant groups, the identification of a theoretical model for the construction and systematic literature reviews to identify the relevant evidence. The basic model for structured specialist further education developed included the creation and implementation of a simple core curriculum for every department, a tool for systematic feedback within the framework of the annual further education interviews and a simple clinical assessment to evaluate the actual clinical performance of physicians in further education. A pilot test of this model was carried out in 150 specialist departments in Germany and continually developed. The project shows that such a program can be systematically developed and pilot studies can be carried out. The central problems in implementation involve the traditional informal further education culture, which as a rule does not implement a systematic elicitation of the state of learning continuously distributed over the whole period of further education and the practical testing of competence development.

  9. Aligning ERP systems with companies' real needs: an `Operational Model Based' method

    NASA Astrophysics Data System (ADS)

    Mamoghli, Sarra; Goepp, Virginie; Botta-Genoulaz, Valérie

    2017-02-01

    Enterprise Resource Planning (ERP) systems offer standard functionalities that have to be configured and customised by a specific company depending on its own requirements. A consistent alignment is therefore an essential success factor of ERP projects. To manage this alignment, an 'Operational Model Based' method is proposed. It is based on the design and the matching of models, and conforms to the modelling views and constructs of the ISO 19439 and 19440 enterprise-modelling standards. It is characterised by: (1) a predefined design and matching order of the models; (2) the formalisation, in terms of modelling constructs, of alignment and misalignment situations; and (3) their association with a set of decisions in order to mitigate the misalignment risk. Thus, a comprehensive understanding of the alignment management during ERP projects is given. Unlike existing methods, this one includes decisions related to the organisational changes an ERP system can induce, as well as criteria on which the best decision can be based. In this way, it provides effective support and guidance to companies implementing ERP systems, as the alignment process is detailed and structured. The method is applied on the ERP project of a Small and Medium Enterprise, showing that it can be used even in contexts where the ERP project expertise level is low.

  10. Observational Measures of Implementer Fidelity for a School-based Preventive Intervention: Development, Reliability and Validity

    PubMed Central

    Cross, Wendi; West, Jennifer; Wyman, Peter A.; Schmeelk-Cone, Karen; Xia, Yinglin; Tu, Xin; Teisl, Michael; Brown, C. Hendricks; Forgatch, Marion

    2014-01-01

    Current measures of implementer fidelity often fail to adequately measure core constructs of adherence and competence, and their relationship to outcomes can be mixed. To address these limitations, we used observational methods to assess these constructs and their relationships to proximal outcomes in a randomized trial of a school-based preventive intervention (Rochester Resilience Project) designed to strengthen emotion self-regulation skills in 1st–3rd graders with elevated aggressive-disruptive behaviors. Within the intervention group (n = 203), a subsample (n = 76) of students was selected to reflect the overall sample. Implementers were 10 paraprofessionals. Videotaped observations of three lessons from Year 1 of the intervention (14 lessons) were coded for each implementer-child dyad on Adherence (content) and Competence (quality). Using multi-level modeling we examined how much of the variance in the fidelity measures was attributed to implementer and to the child within implementer. Both measures had large and significant variance accounted for by implementer (Competence, 68%; Adherence, 41%); child within implementer did not account for significant variance indicating that ratings reflected stable qualities of the implementer rather than the child. Raw Adherence and Competence scores shared 46% of variance (r = .68). Controlling for baseline differences and age, the amount (Adherence) and quality (Competence) of program delivered predicted children’s enhanced response to the intervention on both child and parent reports after six months, but not on teacher report of externalizing behavior. Our findings support the use of multiple observations for measuring fidelity and that adherence and competence are important components of fidelity which could be assessed by many programs using these methods. PMID:24736951

  11. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  12. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50% over typical manufactured homes produced in the northwest.« less

  13. Lead exposure in a tank demolition crew: implications for the new OSHA construction lead standard.

    PubMed

    Waller, K; Osorio, A M; Jones, J

    1994-11-01

    The Federal Occupational Safety and Health Administration (OSHA) has recently extended the basic health and safety provisions of the OSHA lead standard for general industry to workers in the construction industry. In this report we describe a tank demolition worksite that midway through the project strengthened its lead exposure control activities to a level that approximated the current lead standard. Of 12 tested ironworkers and laborers who worked at the site before the change, zinc protoporphyrin levels increased and seven developed blood lead levels (BLL) > 50 micrograms/dL. After the change these workers' BLLs declined. Six workers hired after the change did not experience increases in zinc protoporphyrin and none developed BLL > 25 micrograms/dL. The experience at this worksite demonstrates the usefulness and feasibility of implementing the current lead standard in construction settings.

  14. Implementing AORN recommended practices for a safe environment of care, part II.

    PubMed

    Kennedy, Lynne

    2014-09-01

    Construction in and around a working perioperative suite is a challenge beyond merely managing traffic patterns and maintaining the sterile field. The AORN "Recommended practices for a safe environment of care, part II" provides guidance on building design; movement of patients, personnel, supplies, and equipment; environmental controls; safety and security; and control of noise and distractions. Whether the OR suite evolves through construction, reconstruction, or remodeling, a multidisciplinary team of construction experts and health care professionals should create a functional plan and communicate at every stage of the project to maintain a safe environment and achieve a well-designed outcome. Emergency preparedness, a facility-wide security plan, and minimization of noise and distractions in the OR also help enhance the safety of the perioperative environment. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  15. Inservice teachers' implementation of the Science Writing Heuristic as a tool for professional growth

    NASA Astrophysics Data System (ADS)

    Omar, Sozan H.

    According to the National Science Standards, science educators have been calling for the inclusion of inquiry-based approaches in science classrooms as a reform for science instruction. Teachers' reluctance to implement inquiry-based approaches may be attributed to the different interpretations of the underpinning theory. Any efforts to help teachers implement effective teaching approaches, therefore, should not target merely additive skills; rather, such efforts should foster fundamental changes of beliefs, knowledge, and habits of practice that teachers deeply hold. This study is a part of a bigger project known as the Science Writing Heuristic (SWH) Partnership Professional Development Project, conducted at Iowa State University in association with the Iowa Department of Education to help improve science teaching. The aim of the project is to help in service science teachers understand and apply a student-oriented instructional approach, using the SWH. The framework of the SWH emphasizes the role of classroom dialogical discussion in students' learning. The role of the teacher when implementing constructivist approaches represented in a student-oriented instruction, differs markedly from traditional approaches, and hence there is a need to study the changes in teaching practice when using this specific tool. The methodological framework of this study combined qualitative and quantitative methods. Interpretative case studies for 18 science teachers are presented. A triangulation strategy was used to provide support for the qualitative findings using three different data collection approaches: observation, questionnaire, and interviews. Quantitative data in the form of student performance on higher order conceptual questions and total test scores were collected. Teachers varied in their implementation of the SWH. Three criteria were constructed to define teachers' levels of implementation: epistemological belief, pedagogical practice, and teacher content knowledge. Different components were included within each criterion, with three scales used to rank each teacher's implementation within each criterion. The study is pointing to the importance of assisting science teachers with effective pedagogical strategies if there is to be an impact on students' performance on tests. This project was undertaken with partnerships between schools, Area Educational Agencies, and the University. Such partnerships need to be built to promote successful change to science teaching.

  16. Modular laboratories--cost-effective and sustainable infrastructure for resource-limited settings.

    PubMed

    Bridges, Daniel J; Colborn, James; Chan, Adeline S T; Winters, Anna M; Dengala, Dereje; Fornadel, Christen M; Kosloff, Barry

    2014-12-01

    High-quality laboratory space to support basic science, clinical research projects, or health services is often severely lacking in the developing world. Moreover, the construction of suitable facilities using traditional methods is time-consuming, expensive, and challenging to implement. Three real world examples showing how shipping containers can be converted into modern laboratories are highlighted. These include use as an insectary, a molecular laboratory, and a BSL-3 containment laboratory. These modular conversions have a number of advantages over brick and mortar construction and provide a cost-effective and timely solution to offer high-quality, user-friendly laboratory space applicable within the developing world. © The American Society of Tropical Medicine and Hygiene.

  17. Measure Guideline. Incorporating Thick Layers of Exterior Rigid Insulation on Walls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lstiburek, Joseph; Baker, Peter

    This measure guideline, written by the U.S. Department of Energy’s Building America team Building Science Corporation, provides information about the design and construction of wall assemblies that use layers of rigid exterior insulation thicker than 1-½ in. and that require a secondary cladding attachment location exterior to the insulation. The guideline is separated into several distinct sections that cover: (1) fundamental building science principles relating to the use of exterior insulation on wall assemblies; (2) design principles for tailoring this use to the specific project goals and requirements; and (3) construction detailing to increase understanding about implementing the various designmore » elements.« less

  18. An empirical analysis of strategy implementation process and performance of construction companies

    NASA Astrophysics Data System (ADS)

    Zaidi, F. I.; Zawawi, E. M. A.; Nordin, R. M.; Ahnuar, E. M.

    2018-02-01

    Strategy implementation is known as action stage where it is to be considered as the most difficult stage in strategic planning. Strategy implementation can influence the whole texture of a company including its performance. The aim of this research is to provide the empirical relationship between strategy implementation process and performance of construction companies. This research establishes the strategy implementation process and how it influences the performance of construction companies. This research used quantitative method approached via questionnaire survey. Respondents were G7 construction companies in Klang Valley, Selangor. Pearson correlation analysis indicate a strong positive relationship between strategy implementation process and construction companies’ performance. The most importance part of strategy implementation process is to provide sufficient training for employees which directly influence the construction companies’ profit growth and employees’ growth. This research results will benefit top management in the construction companies to conduct strategy implementation in their companies. This research may not reflect the whole construction industry in Malaysia. Future research may be resumed to small and medium grades contractors and perhaps in other areas in Malaysia.

  19. The road surveying system of the federal highway research institute - a performance evaluation of road segmentation algorithms

    NASA Astrophysics Data System (ADS)

    Streiter, R.; Wanielik, G.

    2013-07-01

    The construction of highways and federal roadways is subject to many restrictions and designing rules. The focus is on safety, comfort and smooth driving. Unfortunately, the planning information for roadways and their real constitution, course and their number of lanes and lane widths is often unsure or not available. Due to digital map databases of roads raised much interest during the last years and became one major cornerstone of innovative Advanced Driving Assistance Systems (ADASs), the demand for accurate and detailed road information increases considerably. Within this project a measurement system for collecting high accurate road data was developed. This paper gives an overview about the sensor configuration within the measurement vehicle, introduces the implemented algorithms and shows some applications implemented in the post processing platform. The aim is to recover the origin parametric description of the roadway and the performance of the measurement system is being evaluated against several original road construction information.

  20. Radioactive Waste Management at the New Conversion Facility of 'TVEL'{sup R} Fuel Company - 13474

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Indyk, S.I.; Volodenko, A.V.; Tvilenev, K.A.

    2013-07-01

    The project on the new conversion facility construction is being implemented by Joint Stock Company (JSC) 'Siberian Group of Chemical Enterprises' (SGChE) within TVEL{sup R} Fuel Company. The objective is to construct the up-to-date facility ensuring the industrial and environmental safety with the reduced impact on the community and environment in compliance with the Russian new regulatory framework on radioactive waste (RW) management. The history of the SGChE development, as well as the concepts and approaches to RW management implemented by now are shown. The SGChE future image is outlined, together with its objectives and concept on RW management inmore » compliance with the new act 'On radioactive waste management' adopted in Russia in 2011. Possible areas of cooperation with international companies are discussed in the field of RW management with the purpose of deploying the best Russian and world practices on RW management at the new conversion facility. (authors)« less

  1. The potential inclusion of value management subject for postgraduate programmes in Malaysia

    NASA Astrophysics Data System (ADS)

    Che Mat, M.; Karim, S. B. Abd; Amran, N. A. E.

    2018-02-01

    The development of construction industry is increasing tremendously. To complement with this scenario, Value Management (VM) is needed to achieve the optimum function by reducing or eliminating the unnecessary cost that does not contribute to the product, system or service. As VM has been increasingly applied to enhance and improve value in construction projects, the purpose of this study is to implement VM as a subject for master’s students at selected public universities in Malaysia. The research is conducted to investigate the potential inclusion of VM as a subject at master degree programmes in Malaysia. Questionnaire survey was designed and delivered to existing master students to explore the current understanding of VM as well as the possibility of introducing VM as a subject. The results showed that the level of awareness on VM is high, yet the understanding of VM is low. This research presents the result of implementing VM as a subject learning for master’s level programme at selected public universities in Malaysia.

  2. Efforts of a Kansas Foundation to Increase Physical Activity and Improve Health by Funding Community Trails, 2012

    PubMed Central

    Heinrich, Katie M.; Lightner, Joseph; Oestman, Katherine B.; Kaczynski, Andrew T.

    2014-01-01

    Introduction Trails are associated with increased physical activity; however, little is known about the process of building trails by various types of organizations. From 2005 through 2012 the Sunflower Foundation: Health Care for Kansans (Sunflower) funded multiple organizations to construct 70 trails of varying lengths and surfaces in municipalities, schools, and communities across Kansas. The purpose of this study was to assess the process of developing and implementing community trail projects across Kansas with funding from a public foundation. Methods In 2012, we stratified funded organizations by type and conducted proportional random sampling to select 20 key informants from those organizations to participate in structured telephone interviews. Interviews were recorded and transcribed verbatim. Two researchers coded interview transcripts according to issues identified by participants. Results Issues associated with trail-building identified as important were collaboration among groups, unexpected construction costs, champions for the project, and level of difficulty of construction. Participants indicated that trails facilitated physical activity. Trails were integrated into communities through events such as walking events and other promotional efforts; these efforts were thought to increase trail use. The perceived outcomes of building the trails included providing the community with a physical activity resource, inspiring the community to start additional trail projects, and increasing the physical activity of local residents. Conclusion Sunflower’s funding was instrumental in developing trail projects to provide new physical activity resources across Kansas. Public health practitioners seeking to increase physical activity should seek funding from foundations that focus on health. PMID:25427316

  3. Building a pipeline of talent for operating radio observatories

    NASA Astrophysics Data System (ADS)

    Wingate, Lory M.

    2016-07-01

    The National Radio Astronomy Observatory's (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering in a focused, nine-week, continuous effort that includes a hands-on build project with the objective of constructing and verifying the performance of a student-level basic radio instrument. The combination of using a project management (PM)/systems engineering (SE) methodical approach based on internationally recognized standards in completing this build is to demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal results. It also exposes the learner to basic radio science theory. An additional simple research project is used to impress upon the learner both the methodical approach, and to provide a basic understanding of the functional area of interest to the learner. This program is designed to teach sustainable skills throughout the full spectrum of activities associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners thereby return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented1 groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  4. Present status and future prospects of the JT-60SA project

    NASA Astrophysics Data System (ADS)

    Ishida, S.; Barabaschi, P.; Kamada, Y.

    2014-10-01

    The JT-60SA project has been implemented jointly by Europe and Japan since June 2007. After the disassembly of JT-60 from the torus hall had been completed in October 2012, the project achieved the major milestone of starting the tokamak's assembly at the JAEA Naka site in January 2013 following the completion of the cryostat base in Europe and its transport to Japan. Procurement and assembly activities for components such as the superconducting magnet, cryogenic system, power supply, vacuum vessel, divertor and cryostat are progressing on track towards the start of operation in March 2019. In preparation for exploitation, the JT-60SA Research Plan was issued in December 2011, and the research integration activities are addressing JT-60SA data management, validation and analysis tools. This paper overviews the latest evolution of the project in terms of construction and exploitation for JT-60SA.

  5. Leaf LIMS: A Flexible Laboratory Information Management System with a Synthetic Biology Focus.

    PubMed

    Craig, Thomas; Holland, Richard; D'Amore, Rosalinda; Johnson, James R; McCue, Hannah V; West, Anthony; Zulkower, Valentin; Tekotte, Hille; Cai, Yizhi; Swan, Daniel; Davey, Robert P; Hertz-Fowler, Christiane; Hall, Anthony; Caddick, Mark

    2017-12-15

    This paper presents Leaf LIMS, a flexible laboratory information management system (LIMS) designed to address the complexity of synthetic biology workflows. At the project's inception there was a lack of a LIMS designed specifically to address synthetic biology processes, with most systems focused on either next generation sequencing or biobanks and clinical sample handling. Leaf LIMS implements integrated project, item, and laboratory stock tracking, offering complete sample and construct genealogy, materials and lot tracking, and modular assay data capture. Hence, it enables highly configurable task-based workflows and supports data capture from project inception to completion. As such, in addition to it supporting synthetic biology it is ideal for many laboratory environments with multiple projects and users. The system is deployed as a web application through Docker and is provided under a permissive MIT license. It is freely available for download at https://leaflims.github.io .

  6. Final Report of the Project "From the finite element method to the virtual element method"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manzini, Gianmarco; Gyrya, Vitaliy

    The Finite Element Method (FEM) is a powerful numerical tool that is being used in a large number of engineering applications. The FEM is constructed on triangular/tetrahedral and quadrilateral/hexahedral meshes. Extending the FEM to general polygonal/polyhedral meshes in straightforward way turns out to be extremely difficult and leads to very complex and computationally expensive schemes. The reason for this failure is that the construction of the basis functions on elements with a very general shape is a non-trivial and complex task. In this project we developed a new family of numerical methods, dubbed the Virtual Element Method (VEM) for themore » numerical approximation of partial differential equations (PDE) of elliptic type suitable to polygonal and polyhedral unstructured meshes. We successfully formulated, implemented and tested these methods and studied both theoretically and numerically their stability, robustness and accuracy for diffusion problems, convection-reaction-diffusion problems, the Stokes equations and the biharmonic equations.« less

  7. National Observation Services at OSUG and construction of a Data Center and of a mutualized information system

    NASA Astrophysics Data System (ADS)

    Meunier, N.

    2016-12-01

    OSUG (Observatoire des Sciences de l'Univers de Grenoble) is strongly involved in more than 20 national observation services (hereafter SNO) covering the different INSU (Institut National des Sciences de l'Univers) sections, and is the PI for ten of them. This strong involvement led us to implement a data center (OSUG-DC), in order to provide the SNO and many other projects an infrastructure and common tools (software development, data monitoring, ...): the objective is to allow them to make their data available to the community in the best conditions. The OSUG-DC has been recognized as a Regional Expertise Center for the astronomy-astrophysics component in 2003 (3 SNO are concerned). This construction is also part of a larger reflexion concerning the mutualization of certain services of the information system at OSUG and at University Grenoble Alpes, some already in place for some time such as a high performance computation regional center. This paper presents the management organisation of these projects, strong points and issues.

  8. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  9. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    PubMed

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P < 0.05) following the implementation of the laboratory atlas project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  10. The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lebon, P.; Bosgiraud, J.M.; Foin, R.

    2013-07-01

    The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequencesmore » anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)« less

  11. Practice-based learning and improvement: a curriculum in continuous quality improvement for surgery residents.

    PubMed

    Canal, David F; Torbeck, Laura; Djuricich, Alexander M

    2007-05-01

    Surgery residents can learn continuous quality improvement (CQI) principles within a structured curriculum and propose quality improvement projects. Curriculum within a surgical residency program. A university surgical residency program with multiple hospital training sites. Fifteen surgical residents during the dedicated research year. A curriculum in CQI that focuses on devising a quality improvement project. Resident self-reported attitudes about quality improvement and implementation of resident-initiated quality improvement projects. Resident survey data demonstrated an improvement in knowledge, self-efficacy, and experiences within CQI. Fifteen individual residents, within smaller teams, created 4 quality improvement projects worthy of implementation. A structured CQI curriculum can be successfully integrated into a general surgery residency program. Residents can learn the skill of constructing CQI project ideas within the framework of the plan-do-study-act cycle. Residents are eager to make improvements in their local system of residency. By giving them the tools to critically investigate systems improvement and a much needed ear to hear their concerns and suggestions for improvement, we found ways to potentially enhance patient care and developed ideas to improve the education of future surgeons. In doing so, we provided the residents with "buy-in" into their residency program, while addressing the competency of practice-based learning and improvement required by the Accreditation Council for Graduate Medical Education for resident education.

  12. Complex assessment of urban housing energy sustainability

    NASA Astrophysics Data System (ADS)

    Popova, Olga; Glebova, Julia; Karakozova, Irina

    2018-03-01

    The article presents the results of a complex experimental-analytical research of residential development energy parameters - survey of construction sites and determination of calculated energy parameters (resistance to heat transfer) considering their technical condition. The authors suggest a methodology for assessing residential development energy parameters on the basis of construction project's structural analysis with the use of advanced intelligent collection systems, processing (self-organizing maps - SOM) and data visualization (geo-informational systems - GIS). SOM clustering permitted to divide the housing stock (on the example of Arkhangelsk city) into groups with similar technical-operational and energy parameters. It is also possible to measure energy parameters of construction project of each cluster by comparing them with reference (normative) measures and also with each other. The authors propose mechanisms for increasing the area's energy stability level by implementing a set of reproduction activities for residential development of various groups. The analysis showed that modern multilevel and high-rise construction buildings have the least heat losses. At present, however, ow-rise wood buildings is the dominant styles of buildings of Arkhangelsk city. Data visualisation on the created heat map showed that such housing stock covers the largest urban area. The development strategies for depressed areas is in a high-rise building, which show the economic, social and environmental benefits of upward growth of the city. An urban regeneration programme for severely rundown urban housing estates is in a high-rise construction building, which show the economic, social and environmental benefits of upward growth of the city.

  13. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  14. A preliminary analysis of recent HVAC energy projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaddy, P.J.; Haake, C.F.

    A typical Government HVAC design over the last 30 years consisted of two oversized (equal tonnage) electric chillers, two oversized (equal NBTU ratings) boilers, an air economizer cycle, a constant air volume system and a central station pneumatic control system. This typical basic layout for plant design has certain advantages such as simplicity and ease to construct throughout the country. The cookie cutter design/build approach suited federal facilities, when utility costs were not a major consideration, in-house maintenance and operations personnel were plentiful and energy conservation was a moral priority and not an economic concern. Those days are history asmore » energy costs have escalated and operating budgets continue to shrink leaving fewer personnel to maintain the same buildings. Advances in HVAC technology and the reduction in costs for energy efficient systems have finally started affecting the Federal Government`s HVAC replacement and new construction designs. This paper is a brief description of three HVAC projects that go outside the traditional government HVAC design parameters. GSA`s Pacific Rim Region, covering the states of Hawaii, California, Nevada, and Arizona, has implemented three HVAC projects utilizing different technologies not normally found in GSA Federal facilities.« less

  15. Management of Legacy Spent Nuclear Fuel Wastes at the Chalk River Laboratories: The Challenges and Innovative Solutions Implemented - 13301

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schruder, Kristan; Goodwin, Derek

    2013-07-01

    AECL's Fuel Packaging and Storage (FPS) Project was initiated in 2004 to retrieve, transfer, and stabilize an identified inventory of degraded research reactor fuel that had been emplaced within in-ground 'Tile Hole' structures in Chalk River Laboratories' Waste Management Area in the 1950's and 60's. Ongoing monitoring of the legacy fuel storage conditions had identified that moisture present in the storage structures had contributed to corrosion of both the fuel and the storage containers. This prompted the initiation of the FPS Project which has as its objective to design, construct, and commission equipment and systems that would allow for themore » ongoing safe storage of this fuel until a final long-term management, or disposition, pathway was available. The FPS Project provides systems and technologies to retrieve and transfer the fuel from the Waste Management Area to a new facility that will repackage, dry, safely store and monitor the fuel for a period of 50 years. All equipment and the new storage facility are designed and constructed to meet the requirements for Class 1 Nuclear Facilities in Canada. (authors)« less

  16. Equally sloped tomography based X-ray full-field nano-CT at Shanghai Synchrotron Radiation Facility

    NASA Astrophysics Data System (ADS)

    Wang, Yudan; Ren, Yuqi; Zhou, Guangzhao; Du, Guohao; Xie, Honglan; Deng, Biao; Xiao, Tiqiao

    2018-07-01

    X-ray full-field nano-computed tomography (nano-CT) has non-destructive three-dimensional imaging capabilities with high spatial resolution, and has been widely applied to investigate morphology and structures in various areas. Conventional tomography reconstructs a 3D object from a large number of equal-angle projections. For nano-CT, it takes long collecting time due to the large projection numbers and long exposure time. Here, equally-sloped tomography (EST) based nano-CT was implemented and constructed on X-ray imaging beamline at the Shanghai Synchrotron Radiation Facility (SSRF) to overcome or alleviate these difficulties. Preliminary results show that hard TXM with the spatial resolution of 100 nm and the EST-based nano-CT with the ability of 3D nano non-destructive characterization have been realized. This technique promotes hard X-ray imaging capability to nano scales at SSRF and could have applications in many fields including nanomaterials, new energy and life sciences. The study will be helpful for the construction of the new full field X-ray nano-imaging beamline with the spatial resolution of 20 nm at SSRF phase II project.

  17. Projects for the implementation of science technology society approach in basic concept of natural science course as application of optical and electrical instruments’ material

    NASA Astrophysics Data System (ADS)

    Satria, E.

    2018-03-01

    Preservice teachers in primary education should be well equipped to meet the challenges of teaching primary science effectively in 21century. The purpose of this research was to describe the projects for the implementation of Science-Technology-Society (STS) approach in Basic Concept of Natural Science course as application of optical and electrical instruments’ material by the preservice teachers in Elementary Schools Teacher Education Program. One of the reasons is the lack of preservice teachers’ ability in making projects for application of STS approach and optical and electrical instruments’ material in Basic Concept of Natural Science course. This research applied descriptive method. The instrument of the research was the researcher himself. The data were gathered through observation and documentation. Based on the results of the research, it was figured out that preservice teachers, in groups, were creatively and successful to make the projects of optical and electrical instruments assigned such as projector and doorbell. It was suggested that the construction of the instruments should be better (fixed and strong structure) and more attractive for both instruments, and used strong light source, high quality images, and it could use speaker box for projector, power battery, and heat sink for electrical instruments.

  18. Building integral projection models: a user's guide.

    PubMed

    Rees, Mark; Childs, Dylan Z; Ellner, Stephen P

    2014-05-01

    In order to understand how changes in individual performance (growth, survival or reproduction) influence population dynamics and evolution, ecologists are increasingly using parameterized mathematical models. For continuously structured populations, where some continuous measure of individual state influences growth, survival or reproduction, integral projection models (IPMs) are commonly used. We provide a detailed description of the steps involved in constructing an IPM, explaining how to: (i) translate your study system into an IPM; (ii) implement your IPM; and (iii) diagnose potential problems with your IPM. We emphasize how the study organism's life cycle, and the timing of censuses, together determine the structure of the IPM kernel and important aspects of the statistical analysis used to parameterize an IPM using data on marked individuals. An IPM based on population studies of Soay sheep is used to illustrate the complete process of constructing, implementing and evaluating an IPM fitted to sample data. We then look at very general approaches to parameterizing an IPM, using a wide range of statistical techniques (e.g. maximum likelihood methods, generalized additive models, nonparametric kernel density estimators). Methods for selecting models for parameterizing IPMs are briefly discussed. We conclude with key recommendations and a brief overview of applications that extend the basic model. The online Supporting Information provides commented R code for all our analyses. © 2014 The Authors. Journal of Animal Ecology published by John Wiley & Sons Ltd on behalf of British Ecological Society.

  19. Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2005-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less

  20. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  1. Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2006-06-01

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  2. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Barry; Evarts, Les

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less

  3. Digging into construction: social networks and their potential impact on knowledge transfer.

    PubMed

    Carlan, N A; Kramer, D M; Bigelow, P; Wells, R; Garritano, E; Vi, P

    2012-01-01

    A six-year study is exploring the most effective ways to disseminate ideas to reduce musculoskeletal disorders (MSDs) in the construction sector. The sector was targeted because MSDs account for 35% of all lost time injuries. This paper reports on the organization of the construction sector, and maps potential pathways of communication, including social networks, to set the stage for future dissemination. The managers, health and safety specialists, union health and safety representatives, and 28 workers from small, medium and large construction companies participated. Over a three-year period, data were collected from 47 qualitative interviews. Questions were guided by the PARIHS (Promoting Action on Research Implementation in Health Services) knowledge-transfer conceptual framework and adapted for the construction sector. The construction sector is a complex and dynamic sector, with non-linear reporting relationships, and divided and diluted responsibilities. Four networks were identified that can potentially facilitate the dissemination of new knowledge: worksite-project networks; union networks; apprenticeship program networks; and networks established by the Construction Safety Association/Infrastructure Health and Safety Association. Flexible and multi-directional lines of communication must be used in this complex environment. This has implications for the future choice of knowledge transfer strategies.

  4. Designing and Developing a NASA Research Projects Knowledge Base and Implementing Knowledge Management and Discovery Techniques

    NASA Astrophysics Data System (ADS)

    Dabiru, L.; O'Hara, C. G.; Shaw, D.; Katragadda, S.; Anderson, D.; Kim, S.; Shrestha, B.; Aanstoos, J.; Frisbie, T.; Policelli, F.; Keblawi, N.

    2006-12-01

    The Research Project Knowledge Base (RPKB) is currently being designed and will be implemented in a manner that is fully compatible and interoperable with enterprise architecture tools developed to support NASA's Applied Sciences Program. Through user needs assessment, collaboration with Stennis Space Center, Goddard Space Flight Center, and NASA's DEVELOP Staff personnel insight to information needs for the RPKB were gathered from across NASA scientific communities of practice. To enable efficient, consistent, standard, structured, and managed data entry and research results compilation a prototype RPKB has been designed and fully integrated with the existing NASA Earth Science Systems Components database. The RPKB will compile research project and keyword information of relevance to the six major science focus areas, 12 national applications, and the Global Change Master Directory (GCMD). The RPKB will include information about projects awarded from NASA research solicitations, project investigator information, research publications, NASA data products employed, and model or decision support tools used or developed as well as new data product information. The RPKB will be developed in a multi-tier architecture that will include a SQL Server relational database backend, middleware, and front end client interfaces for data entry. The purpose of this project is to intelligently harvest the results of research sponsored by the NASA Applied Sciences Program and related research program results. We present various approaches for a wide spectrum of knowledge discovery of research results, publications, projects, etc. from the NASA Systems Components database and global information systems and show how this is implemented in SQL Server database. The application of knowledge discovery is useful for intelligent query answering and multiple-layered database construction. Using advanced EA tools such as the Earth Science Architecture Tool (ESAT), RPKB will enable NASA and partner agencies to efficiently identify the significant results for new experiment directions and principle investigators to formulate experiment directions for new proposals.

  5. [Evaluation on cost-effectiveness of snail control project by environmental modification in hilly regions].

    PubMed

    Li, Shui-Ming; Chen, Shi-Jun; Wu, Xiao-Jun; Chen, Xi-Qing; Zhang, Rong-Ping; Zhang, Jian-Rong

    2011-02-01

    To evaluate the cost-effectiveness of the snail control project by environmental modification in order to provide the evidence for quickly interrupting the transmission of schistosomiasis in hilly regions. Field investigations were carried out. The changes of the snail habitat areas were compared before and after the snail control project. The direct costs of the snail control were calculated. The reduction rates of snail area and snail density were regarded as the evaluation indexes of the effectiveness. The costs for reduction of 1% of snail area and 1% of snail density were used as the unit for cost-effectiveness analysis. After the 15 projects were implemented, there were no snails in 12 areas. The reduction rates of snail areas were 72.22% to 100%. The reduction rates of the snail area and density were both 100% in the areas with digging new ditches to fill up the old ones and building reservoirs. The total cost of 15 projects was 1 450 800 Yuan. The average cost per unit was 0.56 Yuan/m2. After the snail control project by digging new ditches to fill up the old ones was implemented, the costs of snail area and density decreased by one unit were 300 -700 Yuan, by building reservoirs, the costs were 600 -2 600 Yuan, by building fishpond, the costs were 1 200 - 1 500 Yuan, by watershed comprehensive measures, the costs were 900 - 2 700 Yuan. The cost of digging new ditches to fill up the old ones was significantly lower than that of building reservoirs or watershed comprehensive measures, but there was no significant difference between building reservoirs and watershed comprehensive measures. In hilly regions, the implementation of snail control project by environmental modification combined with construction of water conservancy is effective, and the cost-effectiveness of the snail control with digging new ditches to fill up the old ones is excellent.

  6. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste.

    PubMed

    Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin

    2012-03-01

    During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented in practice. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. Sensorized Garments and Textrode-Enabled Measurement Instrumentation for Ambulatory Assessment of the Autonomic Nervous System Response in the ATREC Project

    PubMed Central

    Seoane, Fernando; Ferreira, Javier; Alvarez, Lorena; Buendia, Ruben; Ayllón, David; Llerena, Cosme; Gil-Pita, Roberto

    2013-01-01

    Advances in textile materials, technology and miniaturization of electronics for measurement instrumentation has boosted the development of wearable measurement systems. In several projects sensorized garments and non-invasive instrumentation have been integrated to assess on emotional, cognitive responses as well as physical arousal and status of mental stress through the study of the autonomous nervous system. Assessing the mental state of workers under stressful conditions is critical to identify which workers are in the proper state of mind and which are not ready to undertake a mission, which might consequently risk their own life and the lives of others. The project Assessment in Real Time of the Stress in Combatants (ATREC) aims to enable real time assessment of mental stress of the Spanish Armed Forces during military activities using a wearable measurement system containing sensorized garments and textile-enabled non-invasive instrumentation. This work describes the multiparametric sensorized garments and measurement instrumentation implemented in the first phase of the project required to evaluate physiological indicators and recording candidates that can be useful for detection of mental stress. For such purpose different sensorized garments have been constructed: a textrode chest-strap system with six repositionable textrodes, a sensorized glove and an upper-arm strap. The implemented textile-enabled instrumentation contains one skin galvanometer, two temperature sensors for skin and environmental temperature and an impedance pneumographer containing a 1-channel ECG amplifier to record cardiogenic biopotentials. With such combinations of garments and non-invasive measurement devices, a multiparametric wearable measurement system has been implemented able to record the following physiological parameters: heart and respiration rate, skin galvanic response, environmental and peripheral temperature. To ensure the proper functioning of the implemented garments and devices the full series of 12 sets have been functionally tested recording cardiogenic biopotential, thoracic impedance, galvanic skin response and temperature values. The experimental results indicate that the implemented wearable measurement systems operate according to the specifications and are ready to be used for mental stress experiments, which will be executed in the coming phases of the project with dozens of healthy volunteers. PMID:23857264

  8. Sensorized garments and textrode-enabled measurement instrumentation for ambulatory assessment of the autonomic nervous system response in the ATREC project.

    PubMed

    Seoane, Fernando; Ferreira, Javier; Alvarez, Lorena; Buendia, Ruben; Ayllón, David; Llerena, Cosme; Gil-Pita, Roberto

    2013-07-12

    Advances in textile materials, technology and miniaturization of electronics for measurement instrumentation has boosted the development of wearable measurement systems. In several projects sensorized garments and non-invasive instrumentation have been integrated to assess on emotional, cognitive responses as well as physical arousal and status of mental stress through the study of the autonomous nervous system. Assessing the mental state of workers under stressful conditions is critical to identify which workers are in the proper state of mind and which are not ready to undertake a mission, which might consequently risk their own life and the lives of others. The project Assessment in Real Time of the Stress in Combatants (ATREC) aims to enable real time assessment of mental stress of the Spanish Armed Forces during military activities using a wearable measurement system containing sensorized garments and textile-enabled non-invasive instrumentation. This work describes the multiparametric sensorized garments and measurement instrumentation implemented in the first phase of the project required to evaluate physiological indicators and recording candidates that can be useful for detection of mental stress. For such purpose different sensorized garments have been constructed: a textrode chest-strap system with six repositionable textrodes, a sensorized glove and an upper-arm strap. The implemented textile-enabled instrumentation contains one skin galvanometer, two temperature sensors for skin and environmental temperature and an impedance pneumographer containing a 1-channel ECG amplifier to record cardiogenic biopotentials. With such combinations of garments and non-invasive measurement devices, a multiparametric wearable measurement system has been implemented able to record the following physiological parameters: heart and respiration rate, skin galvanic response, environmental and peripheral temperature. To ensure the proper functioning of the implemented garments and devices the full series of 12 sets have been functionally tested recording cardiogenic biopotential, thoracic impedance, galvanic skin response and temperature values. The experimental results indicate that the implemented wearable measurement systems operate according to the specifications and are ready to be used for mental stress experiments, which will be executed in the coming phases of the project with dozens of healthy volunteers.

  9. Implementing large projects in software engineering courses

    NASA Astrophysics Data System (ADS)

    Coppit, David

    2006-03-01

    In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that threaten the realism of large projects. Third, quantitative evaluation of individuals who work in groups is notoriously difficult. As a result, many software engineering courses compromise the project experience by reducing the team sizes, project scope, and risk. In this paper, we present an approach to teaching a one-semester software engineering course in which 20 to 30 students work together to construct a moderately sized (15KLOC) software system. The approach combines carefully coordinated lectures and homeworks, a hierarchical project management structure, modern communication technologies, and a web-based project tracking and individual assessment system. Our approach provides a more realistic project experience for the students, without incurring significant additional overhead for the instructor. We present our experiences using the approach the last 2 years for the software engineering course at The College of William and Mary. Although the approach has some weaknesses, we believe that they are strongly outweighed by the pedagogical benefits.

  10. BIM Methodology Approach to Infrastructure Design: Case Study of Paniga Tunnel

    NASA Astrophysics Data System (ADS)

    Osello, Anna; Rapetti, Niccolò; Semeraro, Francesco

    2017-10-01

    Nowadays, the implementation of Building Information Modelling (BIM) in civil design represent a new challenge for the AECO (Architecture, Engineering, Construction, Owner and Operator) world, which will involve the interest of many researchers in the next years. It is due to the incentives of Public Administration and European Directives that aim to improve the efficiency and to enhance a better management of the complexity of infrastructure projects. For these reasons, the goal of this research is to propose a methodology for the use of BIM in a tunnel project, analysing the definition of a correct level of detail (LOD) and the possibility to share information via interoperability for FEM analysis.

  11. Stereoscopic applications for design visualization

    NASA Astrophysics Data System (ADS)

    Gilson, Kevin J.

    2007-02-01

    Advances in display technology and 3D design visualization applications have made real-time stereoscopic visualization of architectural and engineering projects a reality. Parsons Brinkerhoff (PB) is a transportation consulting firm that has used digital visualization tools from their inception and has helped pioneer the application of those tools to large scale infrastructure projects. PB is one of the first Architecture/Engineering/Construction (AEC) firms to implement a CAVE- an immersive presentation environment that includes stereoscopic rear-projection capability. The firm also employs a portable stereoscopic front-projection system, and shutter-glass systems for smaller groups. PB is using commercial real-time 3D applications in combination with traditional 3D modeling programs to visualize and present large AEC projects to planners, clients and decision makers in stereo. These presentations create more immersive and spatially realistic presentations of the proposed designs. This paper will present the basic display tools and applications, and the 3D modeling techniques PB is using to produce interactive stereoscopic content. The paper will discuss several architectural and engineering design visualizations we have produced.

  12. Scientist-teacher collaboration: Integration of real data from a coastal wetland into a high school life science ecology-based research project

    NASA Astrophysics Data System (ADS)

    Hagan, Wendy L.

    Project G.R.O.W. is an ecology-based research project developed for high school biology students. The curriculum was designed based on how students learn and awareness of the nature of science and scientific practices so that students would design and carry out scientific investigations using real data from a local coastal wetland. This was a scientist-teacher collaboration between a CSULB biologist and high school biology teacher. Prior to implementing the three-week research project, students had multiple opportunities to practice building requisite skills via 55 lessons focusing on the nature of science, scientific practices, technology, Common Core State Standards of reading, writing, listening and speaking, and Next Generation Science Standards. Project G.R.O.W. culminated with student generated research papers and oral presentations. Outcomes reveal students struggle with constructing explanations and the use of Excel to create meaningful graphs. They showed gains in data organization, analysis, teamwork and aspects of the nature of science.

  13. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  14. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  15. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  16. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  17. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  18. Fast polyenergetic forward projection for image formation using OpenCL on a heterogeneous parallel computing platform.

    PubMed

    Zhou, Lili; Clifford Chao, K S; Chang, Jenghwa

    2012-11-01

    Simulated projection images of digital phantoms constructed from CT scans have been widely used for clinical and research applications but their quality and computation speed are not optimal for real-time comparison with the radiography acquired with an x-ray source of different energies. In this paper, the authors performed polyenergetic forward projections using open computing language (OpenCL) in a parallel computing ecosystem consisting of CPU and general purpose graphics processing unit (GPGPU) for fast and realistic image formation. The proposed polyenergetic forward projection uses a lookup table containing the NIST published mass attenuation coefficients (μ∕ρ) for different tissue types and photon energies ranging from 1 keV to 20 MeV. The CT images of interested sites are first segmented into different tissue types based on the CT numbers and converted to a three-dimensional attenuation phantom by linking each voxel to the corresponding tissue type in the lookup table. The x-ray source can be a radioisotope or an x-ray generator with a known spectrum described as weight w(n) for energy bin E(n). The Siddon method is used to compute the x-ray transmission line integral for E(n) and the x-ray fluence is the weighted sum of the exponential of line integral for all energy bins with added Poisson noise. To validate this method, a digital head and neck phantom constructed from the CT scan of a Rando head phantom was segmented into three (air, gray∕white matter, and bone) regions for calculating the polyenergetic projection images for the Mohan 4 MV energy spectrum. To accelerate the calculation, the authors partitioned the workloads using the task parallelism and data parallelism and scheduled them in a parallel computing ecosystem consisting of CPU and GPGPU (NVIDIA Tesla C2050) using OpenCL only. The authors explored the task overlapping strategy and the sequential method for generating the first and subsequent DRRs. A dispatcher was designed to drive the high-degree parallelism of the task overlapping strategy. Numerical experiments were conducted to compare the performance of the OpenCL∕GPGPU-based implementation with the CPU-based implementation. The projection images were similar to typical portal images obtained with a 4 or 6 MV x-ray source. For a phantom size of 512 × 512 × 223, the time for calculating the line integrals for a 512 × 512 image panel was 16.2 ms on GPGPU for one energy bin in comparison to 8.83 s on CPU. The total computation time for generating one polyenergetic projection image of 512 × 512 was 0.3 s (141 s for CPU). The relative difference between the projection images obtained with the CPU-based and OpenCL∕GPGPU-based implementations was on the order of 10(-6) and was virtually indistinguishable. The task overlapping strategy was 5.84 and 1.16 times faster than the sequential method for the first and the subsequent digitally reconstruction radiographies, respectively. The authors have successfully built digital phantoms using anatomic CT images and NIST μ∕ρ tables for simulating realistic polyenergetic projection images and optimized the processing speed with parallel computing using GPGPU∕OpenCL-based implementation. The computation time was fast (0.3 s per projection image) enough for real-time IGRT (image-guided radiotherapy) applications.

  19. Construction Cost Growth for New Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubic, Jr., William L.

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less

  20. Making acuity-adaptable units work: lessons from the field.

    PubMed

    Zimring, Craig; Seo, Hyun-Bo

    2012-01-01

    Because there have been no clear directions on how to implement acuity-adaptable units (AAUs), this paper describes actual tactics and strategies that have worked in multiple institutions. AAUs have been used in hospitals for the past decade, but reports in the literature have indicated both successes and difficulties in meeting operational goals and objectives. Despite various views regarding acuity adaptability, there is little in the literature that suggests why it works in some hospitals and not in others. As part of a larger construction project, this project team interviewed the leaders of six hospitals to determine what was associated with the successful implementation of AAUs. This paper reports on themes that emerged from these interviews, namely: choose the right specialty for medical centers; adopt the AAU model for the entire facility in community hospitals; bring in and train the right people; change culture through communication; and use acuity-adaptable unit clusters. Main themes, predictable patient progress, and culture change are further discussed and key recommendations are described.

Top