30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...
30 CFR 780.25 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates that any detailed design plans for...
30 CFR 784.16 - Reclamation plan: Siltation structures, impoundments, and refuse piles.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and refuse piles. (a) General. Each application must include a general plan and a detailed design plan... survey describing the potential effect on the structure from subsidence of the subsurface strata... certification statement which includes a schedule setting forth the dates when any detailed design plans for...
FHWA road tunnel design guidelines
DOT National Transportation Integrated Search
2004-07-01
This document provides technical criteria and guidance for the planning and design of road tunnels. Specific areas covered include planning, studies and investigations, design, and design of construction, of tunnels and shafts. Performance concepts a...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
29 CFR 1926.705 - Requirements for lift-slab construction operations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operations shall be designed and planned by a registered professional engineer who has experience in lift-slab construction. Such plans and designs shall be implemented by the employer and shall include detailed instructions and sketches indicating the prescribed method of erection. These plans and designs...
Moertl, Peter M; Canning, John M; Gronlund, Scott D; Dougherty, Michael R P; Johansson, Joakim; Mills, Scott H
2002-01-01
Prior research examined how controllers plan in their traditional environment and identified various information uncertainties as detriments to planning. A planning aid was designed to reduce this uncertainty by perceptually representing important constraints. This included integrating spatial information on the radar screen with discrete information (planned sequences of air traffic). Previous research reported improved planning performance and decreased workload in the planning aid condition. The purpose of this paper was to determine the source of these performance improvements. Analysis of computer interactions using log-linear modeling showed that the planning interface led to less repetitive--but more integrated--information retrieval compared with the traditional planning environment. Ecological interface design principles helped explain how the integrated information retrieval gave rise to the performance improvements. Actual or potential applications of this research include the design and evaluation of interface automation that keeps users in active control by modification of perceptual task characteristics.
Family and Consumer Sciences: A Facility Planning and Design Guide for School Systems.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
This document presents design concepts and considerations for planning and developing middle and high school family and consumer sciences education facilities. It includes discussions on family and consumer sciences education trends and the facility planning process. Design concepts explore multipurpose laboratories and spaces for food/nutrition…
Space Transportation System Payloads Data and Analysis
NASA Technical Reports Server (NTRS)
Peterson, J. D.; Craft, H. G., Jr.
1975-01-01
The background, current developments and future plans for the Space Transportation System Payloads Data and Analysis (SPDA) activities at Marshall Space Flight Center are reviewed. It is shown how the payload data bank and future planned activities will interface with the payloads community and Space Transportation System designers. The interfaces with the STS data base include NASA planning, international planning, payload design, shuttle design, user agencies planning and information, and OMB, Congress and others.
Code of Federal Regulations, 2012 CFR
2012-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... whether a modification is minor include the value and size of the modification and the comparative value...
Neal-Schuman Electronic Classroom Handbook.
ERIC Educational Resources Information Center
Hinchliffe, Lisa Janicke
This book discusses planning, designing, and implementing electronic classrooms. Chapters cover: (1) background, including the definition of electronic classrooms, classroom types, and justifications; (2) planning, including planners and the planning process; (3) gathering and analyzing information, including instructional needs assessment,…
Code of Federal Regulations, 2013 CFR
2013-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... include the value and size of the modification and the comparative value and size of the final product...
Code of Federal Regulations, 2014 CFR
2014-10-01
... research, planning, development, design, construction, alteration, or repair of real property; and (3..., evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and... minor include the value and size of the modification and the comparative value and size of the final...
29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.
Code of Federal Regulations, 2014 CFR
2014-07-01
... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...
29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.
Code of Federal Regulations, 2010 CFR
2010-07-01
... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...
29 CFR 4211.12 - Modifications to the presumptive, modified presumptive and rolling-5 methods.
Code of Federal Regulations, 2011 CFR
2011-07-01
... presumptive method (including a plan that primarily covers employees in the building and construction industry... the building and construction industry, the plan year designated by a plan amendment pursuant to... after the designated plan year are reduced by the value of all outstanding claims for withdrawal...
NASA Technical Reports Server (NTRS)
Koskela, P. E.; Bollman, W. E.; Freeman, J. E.; Helton, M. R.; Reichert, R. J.; Travers, E. S.; Zawacki, S. J.
1973-01-01
The activities of the following members of the Navigation Team are recorded: the Science Sequence Design Group, responsible for preparing the final science sequence designs; the Advanced Sequence Planning Group, responsible for sequence planning; and the Science Recommendation Team (SRT) representatives, responsible for conducting the necessary sequence design interfaces with the teams during the mission. The interface task included science support in both advance planning and daily operations. Science sequences designed during the mission are also discussed.
Locate, Plan, Develop, Use An Outdoor Classroom.
ERIC Educational Resources Information Center
Soil Conservation Service (USDA), Upper Darby, PA.
Designed to aid educational institutions and community organizations in selecting, planning, developing and using outdoor learning areas as outdoor classrooms, this guide includes: (1) Learning by Discovery (scientific, cultural, and recreational goals); (2) The Initial Planning Effort (use of: a planning committee including teachers,…
ERIC Educational Resources Information Center
LYMAN, ROBERT J.
THE USE OF PRESTRESSED CONCRETE IS EMPHASIZED IN THE AREAS OF SCHOOL PLANNING, DESIGN, AND CONSTRUCTION. THE PLANNING SECTION INCLUDES--(1) ROLES OF ACTIVE PARTIES AND RELATED ORGANIZATIONS, (2) PROCEDURES, AND (3) CONCEPTUAL DATA FOR SITE AND BUILDING. THE DESIGN SECTION CONTAINS--(1) DEVELOPMENT OF CONSTRUCTION SYSTEMS, (2) INTEGRATION OF…
The Architectural and Interior Design Planning Process.
ERIC Educational Resources Information Center
Cohen, Elaine
1994-01-01
Explains the planning process in designing effective library facilities and discusses library building requirements that result from electronic information technologies. Highlights include historical structures; Americans with Disabilities Act; resource allocation; electrical power; interior spaces; lighting; design development; the roles of…
Energy and Environment Guide to Action - Chapter 7.1: Electricity Resource Planning and Procurement
Electricity resource planning includes power plants, electricity delivery, and end-use demand. Find more information on designing, implementing, and evaluating electricity resource planning policies. State success stories are included for reference.
ERIC Educational Resources Information Center
McCabe, Gerard B.
This book on public library design and construction contains the following chapters: (1) "Beginning the Plan"; (2) "Data for Planning"; (3) "Location: Finding a Site"; (4) "Interior Design"; (5) "Furnishing and Equipping the Library and Its Environs"; (6) "Other Views," including "Using Small College Library Planning Techniques in Public Library…
Estimating intersection turning movements.
DOT National Transportation Integrated Search
1999-05-01
Turning movement (TM) counts are used for a variety of intersection analyses, including traffic operations analyses, : intersection design, and transportation planning applications. For many planning and design applications, especially in the case of...
36 CFR 910.31 - High architectural quality.
Code of Federal Regulations, 2010 CFR
2010-07-01
... GENERAL GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE... the best contemporary design and planning concepts. Great care and sensitivity must be shown in the architectural treatment of new buildings, particularly in terms of massing, facade design (including materials...
Design for Medical Education. The Development and Planning of a Medical College and Care Center.
ERIC Educational Resources Information Center
Peery, Thomas M.; Green, Alan C.
Planning and design procedures which one medical education center employed in translating its educational objectives, philosophy and techniques into laboratory, classroom and clinic facilities are described. Basic planning considerations included--(1) determination of the curriculum, (2) facility utilization rate, (3) housing of research…
40 CFR 255.10 - Criteria for identifying regions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volume of waste to support the goals and objectives of the State plan, including materials or energy... designated in accordance with the Safe Drinking Water Act, and with air quality planning agencies designated...
40 CFR 255.10 - Criteria for identifying regions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volume of waste to support the goals and objectives of the State plan, including materials or energy... designated in accordance with the Safe Drinking Water Act, and with air quality planning agencies designated...
40 CFR 255.10 - Criteria for identifying regions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volume of waste to support the goals and objectives of the State plan, including materials or energy... designated in accordance with the Safe Drinking Water Act, and with air quality planning agencies designated...
The Educator's "Action" Office.
ERIC Educational Resources Information Center
Martin, Dikran J.
Design criteria, standards, and human factors related to designing and planning flexible and efficient work environments for college faculty members are overviewed with six model (example) office plans included. The physical and psychological design needs in such an office facility are given, with task performance data on student faculty…
Towards automatic planning for manufacturing generative processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
CALTON,TERRI L.
2000-05-24
Generative process planning describes methods process engineers use to modify manufacturing/process plans after designs are complete. A completed design may be the result from the introduction of a new product based on an old design, an assembly upgrade, or modified product designs used for a family of similar products. An engineer designs an assembly and then creates plans capturing manufacturing processes, including assembly sequences, component joining methods, part costs, labor costs, etc. When new products originate as a result of an upgrade, component geometry may change, and/or additional components and subassemblies may be added to or are omitted from themore » original design. As a result process engineers are forced to create new plans. This is further complicated by the fact that the process engineer is forced to manually generate these plans for each product upgrade. To generate new assembly plans for product upgrades, engineers must manually re-specify the manufacturing plan selection criteria and re-run the planners. To remedy this problem, special-purpose assembly planning algorithms have been developed to automatically recognize design modifications and automatically apply previously defined manufacturing plan selection criteria and constraints.« less
On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process
NASA Astrophysics Data System (ADS)
Hongzhi, Zhao; Jian, Zhang
2018-03-01
The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.
75 FR 76345 - Risk Reduction Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Management Plan Each RRPP must include a Fatigue Management Plan (FMP) that will be designed to reduce the... organizations to develop voluntary proactive safety programs designed to improve railroad safety and build... contractors. A railroad's RRPP may be required to specify how the railroad will periodically review the design...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2013 CFR
2013-07-01
... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2014 CFR
2014-07-01
... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to... of architectural or engineering services incurred in preparing a facilities plan and the design...
Wake County Public School System Design Guidelines.
ERIC Educational Resources Information Center
Wake County Public School System, Raleigh, NC.
The Wake County Public School System has published its guidelines for planning and design of functional, cost effective, and durable educational facilities that are attractive and enhance the students' educational experience. The guidelines present basic planning requirement and design criteria for the entire construction process, including: codes…
Planning and Designing for Students with Disabilities.
ERIC Educational Resources Information Center
Abend, Allen C.
This report presents the laws, regulations, and design requirements needed for educational facilities to meet the challenge of educating students with disabilities. A list of planning and design principles to be considered when building or renovating school facilities is offered that includes creating versatile classroom spaces, minimizing travel…
41 CFR 101-26.506-1 - Types of service.
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROGRAM 26.5-GSA Procurement Programs § 101-26.506-1 Types of service. GSA interior planning and design...; softline space plans; development of an interior design program (to include finish materials, furniture and...
What to Do before the Violence Happens: Designing the Crisis Communication Plan.
ERIC Educational Resources Information Center
Armistead, Lew
1996-01-01
When a crisis arrives, two elements can help save your school's reputation: the principal's precrisis credibility with the public and the press and a crisis communication plan. Crisis plans should designate a school spokesperson and procedures for gathering, communicating, and disseminating information. Key audiences include staff, students, and…
ERIC Educational Resources Information Center
Milne, Louise; Eames, Chris
2011-01-01
This paper describes teacher responses to a framework designed to support teacher planning for technology. It includes a learning experience outside the classroom [LEOTC] and is designed specifically for five-year-old students. The planning framework draws together characteristics of technology education, junior primary classrooms and LEOTC to…
Planning in context: A situated view of children's management of science projects
NASA Astrophysics Data System (ADS)
Marshall, Susan Katharine
This study investigated children's collaborative planning of a complex, long-term software design project. Using sociocultural methods, it examined over time the development of design teams' planning negotiations and tools to document the coconstruction of cultural frameworks to organize teams' shared understanding of what and how to plan. Results indicated that student teams developed frameworks to address a set of common planning functions that included design planning, project metaplanning (things such as division of labor or sharing of computer resources) and team collaboration management planning. There were also some between-team variations in planning frameworks, within a bandwidth of options. Teams engaged in opportunistic planning, which reflected shifts in strategies in response to new circumstances over time. Team members with past design project experience ("oldtimers") demonstrated the transfer of their planning framework to the current design task, and they supported the developing participation of "newcomers." Teams constructed physical tools (e.g. planning boards) that acted as visual representations of teams' planning frameworks, and inscriptions of team thinking. The assigned functions of the tools also shifted over time with changing project circumstances. The discussion reexamines current approaches to the study of planning and discusses their educational implications.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... district plans, and other strategies, including land acquisition, designed to create walkable, mixed-use... million of the available TIGER II funds for the planning, preparation, or design of Eligible Projects... manner that will be sustainable for generations to come. Therefore, for projects designed to enhance...
NASA Technical Reports Server (NTRS)
Smith, Philip J.; Mccoy, C. Elaine
1991-01-01
The goals of this research were to develop design concepts to support the task of enroute flight planning. And within this context, to explore and evaluate general design concepts and principles to guide the development of cooperative problem solving systems. A detailed model is to be developed of the cognitive processes involved in flight planning. Included in this model will be the identification of individual differences of subjects. Of particular interest will be differences between pilots and dispatchers. The effect will be studied of the effect on performance of tools that support planning at different levels of abstraction. In order to conduct this research, the Flight Planning Testbed (FPT) was developed, a fully functional testbed environment for studying advanced design concepts for tools to aid in flight planning.
VCE testbed program planning and definition study
NASA Technical Reports Server (NTRS)
Westmoreland, J. S.; Godston, J.
1978-01-01
The flight definition of the Variable Stream Control Engine (VSCE) was updated to reflect design improvements in the two key components: (1) the low emissions duct burner, and (2) the coannular exhaust nozzle. The testbed design was defined and plans for the overall program were formulated. The effect of these improvements was evaluated for performance, emissions, noise, weight, and length. For experimental large scale testing of the duct burner and coannular nozzle, a design definition of the VCE testbed configuration was made. This included selecting the core engine, determining instrumentation requirements, and selecting the test facilities, in addition to defining control system and assembly requirements. Plans for a comprehensive test program to demonstrate the duct burner and nozzle technologies were formulated. The plans include both aeroacoustic and emissions testing.
Framework for Multidisciplinary Analysis, Design, and Optimization with High-Fidelity Analysis Tools
NASA Technical Reports Server (NTRS)
Orr, Stanley A.; Narducci, Robert P.
2009-01-01
A plan is presented for the development of a high fidelity multidisciplinary optimization process for rotorcraft. The plan formulates individual disciplinary design problems, identifies practical high-fidelity tools and processes that can be incorporated in an automated optimization environment, and establishes statements of the multidisciplinary design problem including objectives, constraints, design variables, and cross-disciplinary dependencies. Five key disciplinary areas are selected in the development plan. These are rotor aerodynamics, rotor structures and dynamics, fuselage aerodynamics, fuselage structures, and propulsion / drive system. Flying qualities and noise are included as ancillary areas. Consistency across engineering disciplines is maintained with a central geometry engine that supports all multidisciplinary analysis. The multidisciplinary optimization process targets the preliminary design cycle where gross elements of the helicopter have been defined. These might include number of rotors and rotor configuration (tandem, coaxial, etc.). It is at this stage that sufficient configuration information is defined to perform high-fidelity analysis. At the same time there is enough design freedom to influence a design. The rotorcraft multidisciplinary optimization tool is built and substantiated throughout its development cycle in a staged approach by incorporating disciplines sequentially.
Triple Science GCSEs: Curriculum Planning and Design. GCSEs in Biology, Chemistry and Physics
ERIC Educational Resources Information Center
Morris, Pam; Quill, John
2007-01-01
This publication will provide managers and others with practical advice on how to plan, develop and model the Triple Science requirement, taking into account all the critical factors that need to be considered. This guidance concentrates on curriculum planning and design, including the use of the new (2006) specifications to provide Triple Science…
ATD-2 HITL Experiment Overview
NASA Technical Reports Server (NTRS)
Verma, Savita
2016-01-01
ATD-2 HITL plans and how experiments are planned or created will be discussed here. The previous HITLs- TSTR, CEED and upcoming HITLs will be described here. The full experiment plan including methodology, data collection and such will be described to help the KARI folks design their own experiments and get a flavor for how experiments are designed and conducted.
Enroute flight-path planning - Cooperative performance of flight crews and knowledge-based systems
NASA Technical Reports Server (NTRS)
Smith, Philip J.; Mccoy, Elaine; Layton, Chuck; Galdes, Deb
1989-01-01
Interface design issues associated with the introduction of knowledge-based systems into the cockpit are discussed. Such issues include not only questions about display and control design, they also include deeper system design issues such as questions about the alternative roles and responsibilities of the flight crew and the computer system. In addition, the feasibility of using enroute flight path planning as a context for exploring such research questions is considered. In particular, the development of a prototyping shell that allows rapid design and study of alternative interfaces and system designs is discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
... 1997 Annual PM 2.5 NAAQS maintenance plan, including the on-road motor vehicle insignificance finding... Implementation Plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Kentucky portion of the Huntington-Ashland Area. EPA is also approving the on-road motor vehicle insignificance finding for direct PM...
ERIC Educational Resources Information Center
Quinn, Judy
1992-01-01
Describes the design plans for San Francisco Public Library's new Main Library. Highlights include administrative issues, including the role of branch libraries; funding; technology, both for the building itself and for the collections; accessibility for the physically impaired; special collections; and future plans, including an integrated…
40 CFR 93.115 - Criteria and procedures: Projects from a transportation plan and TIP.
Code of Federal Regulations, 2010 CFR
2010-07-01
... included in the conforming transportation plan and the project's design concept and scope have not changed... the design concept and scope of the project were adequate at the time of the TIP conformity determination to determine its contribution to the TIP's regional emissions, and the project design concept and...
ERIC Educational Resources Information Center
Canadian Architect, 2003
2003-01-01
Describes the design of the Canadian Wine Library at the University of British Columbia, including the educational context and design goals. Includes information on the architects, manufacturers/suppliers, and construction team; a general building description; and commentary on the design. Also includes the floor plan and photographs. (EV)
Realization of planning design of mechanical manufacturing system by Petri net simulation model
NASA Astrophysics Data System (ADS)
Wu, Yanfang; Wan, Xin; Shi, Weixiang
1991-09-01
Planning design is to work out a more overall long-term plan. In order to guarantee a mechanical manufacturing system (MMS) designed to obtain maximum economical benefit, it is necessary to carry out a reasonable planning design for the system. First, some principles on planning design for MMS are introduced. Problems of production scheduling and their decision rules for computer simulation are presented. Realizable method of each production scheduling decision rule in Petri net model is discussed. Second, the solution of conflict rules for conflict problems during running Petri net is given. Third, based on the Petri net model of MMS which includes part flow and tool flow, according to the principle of minimum event time advance, a computer dynamic simulation of the Petri net model, that is, a computer dynamic simulation of MMS, is realized. Finally, the simulation program is applied to a simulation exmple, so the scheme of a planning design for MMS can be evaluated effectively.
Innovative applications of artificial intelligence
NASA Astrophysics Data System (ADS)
Schorr, Herbert; Rappaport, Alain
Papers concerning applications of artificial intelligence are presented, covering applications in aerospace technology, banking and finance, biotechnology, emergency services, law, media planning, music, the military, operations management, personnel management, retail packaging, and manufacturing assembly and design. Specific topics include Space Shuttle telemetry monitoring, an intelligent training system for Space Shuttle flight controllers, an expert system for the diagnostics of manufacturing equipment, a logistics management system, a cooling systems design assistant, and a knowledge-based integrated circuit design critic. Additional topics include a hydraulic circuit design assistant, the use of a connector assembly specification expert system to harness detailed assembly process knowledge, a mixed initiative approach to airlift planning, naval battle management decision aids, an inventory simulation tool, a peptide synthesis expert system, and a system for planning the discharging and loading of container ships.
25 CFR 170.411 - What may a long-range transportation plan include?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false What may a long-range transportation plan include? 170.411 Section 170.411 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities...
Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan
NASA Technical Reports Server (NTRS)
Klus, W. L.
1987-01-01
A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.
FAQs about Facilities: Practical Tips for Planning Renovations and New School Library Media Centers.
ERIC Educational Resources Information Center
Lenk, Mary Anne
2002-01-01
Answers frequently asked questions (FAQs) related to planning for renovating or building school library media centers (SLMCs). Topics include the role of the school library media specialist, advance planning, importance of a written long-range plan, library consultants, courses on planning, design compromises, planning resources, professional…
42 CFR 456.380 - Individual written plan of care.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Intermediate Care Facilities Plan of Care § 456.380 Individual written plan of care. (a) Before admission to an ICF or before... designed to meet the objectives of the plan of care; (5) Plans for continuing care, including review and...
42 CFR 456.380 - Individual written plan of care.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Intermediate Care Facilities Plan of Care § 456.380 Individual written plan of care. (a) Before admission to an ICF or before... designed to meet the objectives of the plan of care; (5) Plans for continuing care, including review and...
42 CFR 456.380 - Individual written plan of care.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS UTILIZATION CONTROL Utilization Control: Intermediate Care Facilities Plan of Care § 456.380 Individual written plan of care. (a) Before admission to an ICF or before... designed to meet the objectives of the plan of care; (5) Plans for continuing care, including review and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Plans. 52.01-5 Section 52.01-5 Shipping COAST GUARD... Plans. (a) Manufacturers intending to fabricate boilers to be installed on vessels shall submit detailed plans as required by subpart 50.20 of this subchapter. The plans, including design calculations, must be...
ERIC Educational Resources Information Center
Sani, A. Sadiq; Abraham, Charles; Denford, Sarah; Mathews, Catherine
2018-01-01
This study investigated facilitators and challenges to designing, implementing and evaluating school-based sexual health education in sub-Saharan Africa, using interviews with intervention designers and researchers. At the pre-planning and planning stages, participants reported that facilitating factors included addressing the reproductive health…
Purpose Designed Facilities. School Buildings Planning, Design, and Construction Series No. 4.
ERIC Educational Resources Information Center
Odell, John H.
A school construction guide offers key personnel in school development projects information on the complex task of master planning and construction of schools in Australia. This chapter of the guide provides advice on issues involving school space design and the kinds of spaces required in schools, including lecture spaces and seminar rooms,…
School Counselor Lead Initial Individual Career and Academic Plan Implementation Design
ERIC Educational Resources Information Center
Moeder-Chandler, Markus
2017-01-01
In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…
40 CFR 62.8870 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS Ohio Landfill Gas Emissions from Existing Municipal Solid Waste Landfills § 62.8870 Identification of plan. The Ohio State Implementation Plan for implementing the Federal Municipal Solid Waste Landfill Emission Guidelines including...
Family Planning Handbook for Doctors.
ERIC Educational Resources Information Center
Kleinman, Ronald L., Ed.
The International Planned Parenthood Federation (IPPF) believes that all people have the right to family planning information, including premarital and marital counseling, contraception information, and sex education. This physician's handbook is designed to provide all doctors with the necessary instructions on the latest family planning methods…
Access to Accredited Cancer Hospitals Within Federal Exchange Plans Under the Affordable Care Act
Liao, Kai-Ping; Krause, Trudy M.; Giordano, Sharon H.
2017-01-01
Purpose The Affordable Care Act expanded access to health insurance in the United States, but concerns have arisen about access to specialized cancer care within narrow provider networks. To characterize the scope and potential impact of this problem, we assessed rates of inclusion of Commission on Cancer (CoC) –accredited hospitals and National Cancer Institute (NCI) –designated cancer centers within federal exchange networks. Methods We downloaded publicly available machine-readable network data and public use files for individual federal exchange plans from the Centers for Medicare and Medicaid Services for the 2016 enrollment year. We linked this information to National Provider Identifier data, identified a set of distinct provider networks, and assessed the rates of inclusion of CoC-accredited hospitals and NCI-designated centers. We measured variation in these rates according to geography, plan type, and metal level. Results Of 4,058 unique individual plans, network data were available for 3,637 (90%); hospital information was available for 3,531 (87%). Provider lists for these plans reduced into 295 unique networks for analysis. Ninety-five percent of networks included at least one CoC-accredited hospital, but just 41% of networks included NCI-designated centers. States and counties each varied substantially in the proportion of networks listed that included NCI-designated centers (range, 0% to 100%). The proportion of networks that included NCI-designated centers also varied by plan type (range, 31% for health maintenance organizations to 49% for preferred provider organizations; P = .04) but not by metal level. Conclusion A large majority of federal exchange networks contain CoC-accredited hospitals, but most do not contain NCI-designated cancer centers. These results will inform policy regarding access to cancer care, and they reinforce the importance of promoting access to clinical trials and specialized care through community sites. PMID:28068172
Urban planning and public health at CDC.
Kochtitzky, Chris S; Frumkin, H; Rodriguez, R; Dannenberg, A L; Rayman, J; Rose, K; Gillig, R; Kanter, T
2006-12-22
Urban planning, also called city and regional planning, is a multidisciplinary field in which professionals work to improve the welfare of persons and communities by creating more convenient, equitable, healthful, efficient, and attractive places now and for the future. The centerpiece of urban planning activities is a "master plan," which can take many forms, including comprehensive plans, neighborhood plans, community action plans, regulatory and incentive strategies, economic development plans, and disaster preparedness plans. Traditionally, these plans include assessing and planning for community needs in some or all of the following areas: transportation, housing, commercial/office buildings, natural resource utilization, environmental protection, and health-care infrastructure. Urban planning and public health share common missions and perspectives. Both aim to improve human well-being, emphasize needs assessment and service delivery, manage complex social systems, focus at the population level, and rely on community-based participatory methods. Both fields focus on the needs of vulnerable populations. Throughout their development, both fields have broadened their perspectives. Initially, public health most often used a biomedical model (examining normal/abnormal functioning of the human organism), and urban planning often relied on a geographic model (analysis of human needs or interactions in a spatial context). However, both fields have expanded their tools and perspectives, in part because of the influence of the other. Urban planning and public health have been intertwined for most of their histories. In 1854, British physician John Snow used geographic mapping of an outbreak of cholera in London to identify a public water pump as the outbreak's source. Geographic analysis is a key planning tool shared by urban planning and public health. In the mid-1800s, planners such as Frederick Law Olmsted bridged the gap between the fields by advancing the concept that community design contributes to physical and mental health; serving as President Lincoln's U.S. Sanitary Commission Secretary; and designing hundreds of places, including New York's Central Park. By 1872, the disciplines were so aligned that two of the seven founders of the American Public Health Association were urban designers (an architect and a housing specialist). In 1926, the U.S. Supreme Court, in validating zoning and land-use law as a legal government authority in Village of Euclid v. Ambler Realty, cited the protection of public health as part of its justification. Other connections have included 1) pioneering urbanist Jane Jacobs, who during the 1960s, called for community design that offered safe and convenient options for walking, biking, and impromptu social interaction; and 2) the Healthy Cities movement, which began in Europe and the United States during the 1980s and now includes projects in approximately 1,000 cities that in various ways highlight the role of health as much more than the presence of medical care.
DOT National Transportation Integrated Search
2010-04-01
This publication is a resource designed to enable transportation planners and their planning partners to build a transportation plan that includes operations objectives, performance measures, and strategies that are relevant to their region, that ref...
Raster graphic helmet-mounted display study
NASA Technical Reports Server (NTRS)
Beamon, William S.; Moran, Susanna I.
1990-01-01
A design of a helmet mounted display system is presented, including a design specification and development plan for the selected design approach. The requirements for the helmet mounted display system and a survey of applicable technologies are presented. Three helmet display concepts are then described which utilize lasers, liquid crystal display's (LCD's), and subminiature cathode ray tubes (CRT's), respectively. The laser approach is further developed in a design specification and a development plan.
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2013 CFR
2013-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2010 CFR
2010-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2014 CFR
2014-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
Design of internal support structures for an inflatable lunar habitat
NASA Technical Reports Server (NTRS)
Cameron, Elizabeth A.; Duston, John A.; Lee, David D.
1990-01-01
NASA has a long range goal of constructing a fully equipped, manned lunar outpost on the near side of the moon by the year 2015. The proposed outpost includes an inflatable lunar habitat to support crews during missions longer that 12 months. A design for the internal support structures of the inflatable habitat is presented. The design solution includes material selection, substructure design, assembly plan development, and concept scale model construction. Alternate designs and design solutions for each component of the design are discussed. Alternate materials include aluminum, titanium, and reinforced polymers. Vertical support alternates include column systems, truss systems, suspension systems, and lunar lander supports. Horizontal alternates include beams, trusses, floor/truss systems, and expandable trusses. Feasibility studies on each alternate showed that truss systems and expandable trusses were the most feasible candidates for conceptual design. The team based the designs on the properties of 7075 T73 aluminum. The substructure assembly plan, minimizes assembly time and allows crews to construct the habitat without the use of EVA suits. In addition to the design solutions, the report gives conclusions and recommendations for further study of the inflatable habitat design.
ERIC Educational Resources Information Center
Taggart, Jim
2002-01-01
Describes the design of the Nicola Valley Institute of Technology in British Columbia, including the educational context and design goals. Includes information on architects, consultants, and cost, as well as floor plans and photographs. Discusses how the design for this First Nations school blends aboriginal constructs and…
2014-05-01
There are several types of planning processes and plans, including strategic, operational, tactical, and contingency. For this document, operational planning includes tactical planning. This chapter examines the strategic planning process and includes an introduction into disaster response plans. "A strategic plan is an outline of steps designed with the goals of the entire organisation as a whole in mind, rather than with the goals of specific divisions or departments". Strategic planning includes all measures taken to provide a broad picture of what must be achieved and in which order, including how to organise a system capable of achieving the overall goals. Strategic planning often is done pre-event, based on previous experience and expertise. The strategic planning for disasters converts needs into a strategic plan of action. Strategic plans detail the goals that must be achieved. The process of converting needs into plans has been deconstructed into its components and includes consideration of: (1) disaster response plans; (2) interventions underway or planned; (3) available resources; (4) current status vs. pre-event status; (5) history and experience of the planners; and (6) access to the affected population. These factors are tempered by the local: (a) geography; (b) climate; (c) culture; (d) safety; and (e) practicality. The planning process consumes resources (costs). All plans must be adapted to the actual conditions--things never happen exactly as planned.
Planning for School Emergencies.
ERIC Educational Resources Information Center
Della-Giustina, Daniel E.
This document is designed to provide civil leaders and school administrators with a resource that will enable them to develop comprehensive contingency plans for specific emergency situations. A discussion of disaster and emergency management planning includes an outline of the objectives of emergency planning that were established for this guide.…
ERIC Educational Resources Information Center
Amelar, Sarah
2003-01-01
Describes the design of Simmons Hall, an undergraduate dormitory at the Massachusetts Institute of Technology, including the educational context and design goals. Includes information on the architects, as well as floor plans and photographs. (EV)
Zhao, Linping; Patel, Pravin K; Cohen, Mimis
2012-07-01
Computer aided design and manufacturing (CAD/CAM) technology today is the standard in manufacturing industry. The application of the CAD/CAM technology, together with the emerging 3D medical images based virtual surgical planning (VSP) technology, to craniomaxillofacial reconstruction has been gaining increasing attention to reconstructive surgeons. This article illustrates the components, system and clinical management of the VSP and CAD/CAM technology including: data acquisition, virtual surgical and treatment planning, individual implant design and fabrication, and outcome assessment. It focuses primarily on the technical aspects of the VSP and CAD/CAM system to improve the predictability of the planning and outcome.
Smit, Warren; Hancock, Trevor; Kumaresen, Jacob; Santos-Burgoa, Carlos; Sánchez-Kobashi Meneses, Raúl; Friel, Sharon
2011-10-01
The importance of reestablishing the link between urban planning and public health has been recognized in recent decades; this paper focuses on the relationship between urban planning/design and health equity, especially in cities in low and middle-income countries (LMICs). The physical urban environment can be shaped through various planning and design processes including urban planning, urban design, landscape architecture, infrastructure design, architecture, and transport planning. The resultant urban environment has important impacts on the health of the people who live and work there. Urban planning and design processes can also affect health equity through shaping the extent to which the physical urban environments of different parts of cities facilitate the availability of adequate housing and basic infrastructure, equitable access to the other benefits of urban life, a safe living environment, a healthy natural environment, food security and healthy nutrition, and an urban environment conducive to outdoor physical activity. A new research and action agenda for the urban environment and health equity in LMICs should consist of four main components. We need to better understand intra-urban health inequities in LMICs; we need to better understand how changes in the built environment in LMICs affect health equity; we need to explore ways of successfully planning, designing, and implementing improved health/health equity; and we need to develop evidence-based recommendations for healthy urban planning/design in LMICs.
Pre-Employment Laboratory Education. Clothing/Fashion Design Guidebook.
ERIC Educational Resources Information Center
Texas Tech Univ., Lubbock. Home Economics Instructional Materials Center.
This guidebook is designed for use in teaching students enrolled in preemployment laboratory education (PELE) clothing/fashion design programs. The first of two major sections includes an overview for teachers on planning, conducting, and evaluating a PELE clothing/fashion design program. Specific topics discussed in section 1 include (1)…
TRACON Aircraft Arrival Planning and Optimization Through Spatial Constraint Satisfaction
NASA Technical Reports Server (NTRS)
Bergh, Christopher P.; Krzeczowski, Kenneth J.; Davis, Thomas J.; Denery, Dallas G. (Technical Monitor)
1995-01-01
A new aircraft arrival planning and optimization algorithm has been incorporated into the Final Approach Spacing Tool (FAST) in the Center-TRACON Automation System (CTAS) developed at NASA-Ames Research Center. FAST simulations have been conducted over three years involving full-proficiency, level five air traffic controllers from around the United States. From these simulations an algorithm, called Spatial Constraint Satisfaction, has been designed, coded, undergone testing, and soon will begin field evaluation at the Dallas-Fort Worth and Denver International airport facilities. The purpose of this new design is an attempt to show that the generation of efficient and conflict free aircraft arrival plans at the runway does not guarantee an operationally acceptable arrival plan upstream from the runway -information encompassing the entire arrival airspace must be used in order to create an acceptable aircraft arrival plan. This new design includes functions available previously but additionally includes necessary representations of controller preferences and workload, operationally required amounts of extra separation, and integrates aircraft conflict resolution. As a result, the Spatial Constraint Satisfaction algorithm produces an optimized aircraft arrival plan that is more acceptable in terms of arrival procedures and air traffic controller workload. This paper discusses the current Air Traffic Control arrival planning procedures, previous work in this field, the design of the Spatial Constraint Satisfaction algorithm, and the results of recent evaluations of the algorithm.
Recreation and Sport Planning and Design. Second Edition.
ERIC Educational Resources Information Center
Daly, Jim
This book offers guidelines for planning and designing cost-effective community recreation and sports facilities and open spaces in Australia. Seven chapters include: (1) "Benefits of Recreation and Sport" (e.g., quality of life, and diversity of recreation and sport); (2) "Provision of Recreation and Sport Open Spaces" (e.g.,…
Professional Development Planning and Design. Issues in Science Education.
ERIC Educational Resources Information Center
Rhoton, Jack; Bowers, Patricia
This book focuses on the professional development of teachers and discusses issues related to the planning and design of professional development programs. The content of the book is divided into three parts. Part 1, Standards-Based Reform and Professional Development includes: (1) "National Science Education Standards as a Catalyst for…
Research on key technology of planning and design for AC/DC hybrid distribution network
NASA Astrophysics Data System (ADS)
Shen, Yu; Wu, Guilian; Zheng, Huan; Deng, Junpeng; Shi, Pengjia
2018-04-01
With the increasing demand of DC generation and DC load, the development of DC technology, AC and DC distribution network integrating will become an important form of future distribution network. In this paper, the key technology of planning and design for AC/DC hybrid distribution network is proposed, including the selection of AC and DC voltage series, the design of typical grid structure and the comprehensive evaluation method of planning scheme. The research results provide some ideas and directions for the future development of AC/DC hybrid distribution network.
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
40 CFR 72.41 - Phase I substitution plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...
38 CFR 39.32 - Plan preparation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... a previously approved project and there have been no changes. Relevant information may then be shown... having other change or direction between corners) shall be referenced with curve data (including... indicated. The master plan shall analyze all factors affecting the design, including climate, soil...
How are state insurance marketplaces shaping health plan design?
Rosenbaum, Sara; Lopez, Nancy; Mehta, Devi; Dorley, Mark; Burke, Taylor; Widge, Alicia
2013-12-01
Part of states' roles in administering the new health insurance marketplaces is to certify the health plans available for purchase. This analysis focuses on how state-based and state partnership marketplaces are using their flexibility in setting certification standards to shape plan design in the individual market. It focuses on three aspects of certification: provider networks; inclusion of essential community providers; and benefit substitution, which allows plans to offer benefits that differ from a state's benchmark plan. A review of documents collected from 18 states and the District of Columbia finds that 13 states go beyond the minimum federal requirements with respect to provider network standards, four states specify additional standards for including essential community providers, and five states and Washington, D.C., bar benefit substitution. These interstate variations in plan design reflect the challenges policymakers face in balancing health care affordability, benefit coverage, and access to care through the marketplace plans.
Lund, Einar; Bringa, Olav Rand
2016-01-01
The national policy in Norway have since the last part of the 1990-ies been organized in programs that erected actions including national authorities, municipalities, regional authorities and private enterprises. What have we gained by our national activities to mainstream inclusive and accessibility policy for persons with reduced capability through the principles of Universal Design? Have we made society accessible to everyone and prevented discrimination. Are the results visible? We can measure results on several sectors, inter alia public buildings, outdoor areas, central communication hubs, public transport and the occurrence plans for Universal Design in municipalities and regions. Through several programs and action plans the Norwegian government has developed a sectoral approach for including persons with disabilities in the society. The majority of ministries have participated in these plans. Local initiatives, local councils for disabled people, and later on municipalities and county administrations were supported by national authorities as complements to regulations and laws. In addition, guidelines and assisting funds were used. The main objective was to redefine the national policy, using better defined national goals and introducing Universal Design to replace accessibility as the basic tool. The mainstreaming of the accessibility policy, where Universal Design was included in relevant sectors and activities, was a crucial part of the strategy. The national policy was organized in programs that erected actions focusing on how to reach, inspire and include municipalities and regional authorities in their own struggle for Universal Design. Through the mainstream approach ministries have both earmarked economic transfers to their own agencies and used steering documents guide to these agencies how to implement Universal Design in their advisory services, in practicing laws and regulations and in their own planning and building activities.
The expected results include an integrated process and mechanical design including a fabrication plan for the glycerol dehydration reactor, comprehensive heat and material balance, environmental impact assessment and comprehensive safety review. The resulting process design w...
Code of Federal Regulations, 2010 CFR
2010-07-01
... utilize an interdisciplinary team with leadership by planning, and participation from engineering, design.... Subsequent aspects of planning, development, and management for the specific project will be directed to... management plans for each specific water resource project, including at least one public meeting. The...
NASA Technical Reports Server (NTRS)
1975-01-01
Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.
Planning and design of Berg-en-Dal, a new camp in Kruger National Park
NASA Astrophysics Data System (ADS)
van Riet, W. F.; Cooks, J.
1990-05-01
The premise of this article is that the planning and design of new rest camps in conservation areas should be based on ecological principles in such a way that the plant ecology within the camp be an integral part and extension of the natural ecology of its immediate vicinity. This is desirable so that visitors to the camp will be provided not only with facilities for resting, eating, and sleeping, but also be able to enjoy and study the natural environment in a relaxed atmosphere. The Berg-en-Dal rest camp, which was established in Kruger National Park, was planned in such a way and designed according to the principles outlined by the authors in a companion article. The planning included six zones: a control zone, day visitor zone, overnight visitor zone, staff accommodation zone, recreation zone, and service zone. The point is stressed that plant species selected to be used as additional vegetation to those already growing in the camp were endemic to the nine landscape facets identified in the camp. The design allowed for separation of the various land-use zones in such a way that they would complement each other rather than be a hindrance to each other. The camp has been built according to the plans included in this article and has proved to be a great success. The conclusion is drawn that the planning principles are sound and should be used in the future for the planning and design of rest camps for conservation areas in South Africa.
Initiatives to Develop Web Sites Including Information about Brownfields Properties
This web site was created to assist in planning, designing, and operating web sites that include information about individual brownfields properties. The report is of value to parties designing or managing such sites.
Designing automatic resupply systems.
Harding, M L
1999-02-01
This article outlines the process for designing and implementing autoresupply systems. The planning process includes determination of goals and appropriate participation. Different types of autoresupply mechanisms include kanban, breadman, consignment, systems contracts, and direct shipping from an MRP schedule.
ERIC Educational Resources Information Center
Duruh, Benjamin C.
2018-01-01
This study investigated the Planning, Supervision and Quality of Instructional Leadership of Girls' Day Secondary Schools in Kaduna State. The research design adopted was a survey design. The independent variables were the respondents which include principals, teachers, students, parents and government officials while dependent variable includes…
A Four-Stage Model for Planning Computer-Based Instruction.
ERIC Educational Resources Information Center
Morrison, Gary R.; Ross, Steven M.
1988-01-01
Describes a flexible planning process for developing computer based instruction (CBI) in which the CBI design is implemented on paper between the lesson design and the program production. A four-stage model is explained, including (1) an initial flowchart, (2) storyboards, (3) a detailed flowchart, and (4) an evaluation. (16 references)…
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
21 CFR 123.6 - Hazard analysis and Hazard Analysis Critical Control Point (HACCP) plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... identified food safety hazards, including as appropriate: (i) Critical control points designed to control... control points designed to control food safety hazards introduced outside the processing plant environment... Control Point (HACCP) plan. 123.6 Section 123.6 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Technology (MACT) Standards § 270.235 Options for incinerators, cement kilns, lightweight aggregate kilns... malfunction plan, design, and operating history. (2) Retain or add these permit requirements to the permit to... information including the source's startup, shutdown, and malfunction plan, design, and operating history; and...
Mission Operations of the Mars Exploration Rovers
NASA Technical Reports Server (NTRS)
Bass, Deborah; Lauback, Sharon; Mishkin, Andrew; Limonadi, Daniel
2007-01-01
A document describes a system of processes involved in planning, commanding, and monitoring operations of the rovers Spirit and Opportunity of the Mars Exploration Rover mission. The system is designed to minimize command turnaround time, given that inherent uncertainties in terrain conditions and in successful completion of planned landed spacecraft motions preclude planning of some spacecraft activities until the results of prior activities are known by the ground-based operations team. The processes are partitioned into those (designated as tactical) that must be tied to the Martian clock and those (designated strategic) that can, without loss, be completed in a more leisurely fashion. The tactical processes include assessment of downlinked data, refinement and validation of activity plans, sequencing of commands, and integration and validation of sequences. Strategic processes include communications planning and generation of long-term activity plans. The primary benefit of this partition is to enable the tactical portion of the team to focus solely on tasks that contribute directly to meeting the deadlines for commanding the rover s each sol (1 sol = 1 Martian day) - achieving a turnaround time of 18 hours or less, while facilitating strategic team interactions with other organizations that do not work on a Mars time schedule.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
...-road motor vehicle insignificance finding that is included as part of Kentucky's maintenance plan for... Plan (SIP) revision containing a maintenance plan for the Kentucky portion of the Huntington-Ashland...-Ashland Area. EPA is also proposing to approve the on-road motor vehicle insignificance finding for direct...
The Marketing Plan: An Integrative Device for Teaching Marketing Management.
ERIC Educational Resources Information Center
Berdine, W. R.; Petersen, James C.
1980-01-01
The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham fine... implementation plan (SIP) to include the 1997 Annual PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... the Alabama Department of Environmental Management (ADEM), Air Division, to redesignate the Birmingham... implementation plan (SIP) to include the 2006 24-hour PM 2.5 maintenance plan for the Birmingham Area that... action also approves the 2009 emissions inventory submitted with the maintenance plan. DATES: Effective...
DOT National Transportation Integrated Search
2003-09-22
This document presents the Evaluation Teams plan for conducting the evaluation of the FOT in Washington State. A companion document exists for the evaluation of the Utah deployment. This plan includes the experimental design for testing hypotheses...
Code of Federal Regulations, 2010 CFR
2010-10-01
... qualifying covered retiree under the plan. Benefit option means a particular benefit design, category of benefits, or cost-sharing arrangement offered within a group health plan. Employment-based retiree health... the foregoing, including a health benefits plan offered under chapter 89 of Title 5, United States...
Wind Shear radar program future plans
NASA Technical Reports Server (NTRS)
Robertson, Roy E.
1991-01-01
The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.
Strategic Planning and the Future of Community Colleges.
ERIC Educational Resources Information Center
Myran, Gunder A., Ed.; Kelley, Douglas, Ed.
Designed for institutional leaders facing fundamental questions of changes in mission, goals, external relations, and internal priorities, this collection offers an introduction to strategic planning and descriptions of planning processes at several community colleges. Section I includes the following essays: "What Is Strategic…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-04
...'') section 110(k)(3), EPA is approving a maintenance plan for the 1997 8-hour ozone standard (``San Diego 8-hour maintenance plan'') for the San Diego County 1997 ozone nonattainment area (``San Diego 8-hour... maintenance plan is included in a document titled Redesignation Request and Maintenance Plan for the 1997...
Commander’s Handbook for Strategic Communication and Communication Strategy
2010-06-24
designed to gather SC educators and key practitioners for thoughtful discussions on SC education and training issues. KLE is not about engaging key...operational design and early joint operation planning process to identify indicators that will enable us to detect when it is time to “reframe” the problem...integrating process across DOD, included in concept and doctrine development, strategy and plan design , execution, and assessment, and incorporated
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
40 CFR 230.94 - Planning and documentation.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-sections), watershed size, design discharge, and riparian area plantings. (8) Maintenance plan. A... sustainability of the resource, including long-term financing mechanisms and the party responsible for long-term...
Servicers system demonstration plan and capability development
NASA Technical Reports Server (NTRS)
Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.
1985-01-01
A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.
Crowther, Martha R; Huang, Chao-Hui Sylvia; Allen, Rebecca S
2015-01-01
This exploratory study examined the context and consequences of custodial grandparenting, along with attitudes and preferences regarding future planning among 22 African-American custodial grandmothers. A mixed-method research design was employed. Based on our integration of two theories regarding future planning and health behavior change, caregiving, emotional distress, religiosity and spirituality, and future planning were assessed using questionnaires along with semi-structured interviews. African-American custodial grandmothers (mean age M = 53.64, SD = 9.58) perceived their caregiving role as rewarding (72%) yet challenging (86%). More than 40% reported significant emotional distress (CES-D ≥ 16) that warrants clinical attention. Findings showed that while 64% of study participants had future plans regarding who will substitute in their caregiving role if they become incapacitated, only 9% had completed a living will. Three major themes emerged regarding custodial grandmothers' caregiving role which includes: (1) rewards; (2) challenges including feeling overwhelmed and health concerns; and (3) caregiving decisions including conflicts between 'My plan was…/put self on-hold' for grandchildren and difficulty with future planning. These themes highlighted the dynamics of caregiving across time, including current context and the ongoing process of decision-making. Findings suggest that while African-American custodial grandmothers find caregiving rewarding, they face unique challenges in contemplating and developing future plans. Custodial grandmothers think about substitute caregivers for their grandchildren but need assistance communicating a plan focused on their own needs for future care. Culturally sensitive interventions designed to facilitate effective utilization of future plans within this caregiver population are needed.
Teaching Creative Thinking through Architectural Design
ERIC Educational Resources Information Center
Jeon, Kijeong; Cotner, Teresa L.
2010-01-01
Art and art education are open to broader definitions in the twenty-first century. It is time that teachers seriously think about including built environment design in K-12 art education. The term "built environment" includes interior design, architecture, landscape architecture, and urban planning. Due to increased exposure to built environment…
New Map Symbol System for Disaster Management
NASA Astrophysics Data System (ADS)
Marinova, Silvia T.
2018-05-01
In the last 10 years Bulgaria was frequently affected by natural and man-made disasters that caused considerable losses. According to the Bulgarian Disaster Management Act (2006) disaster management should be planned at local, regional and national level. Disaster protection is based on plans that include maps such as hazard maps, maps for protection, maps for evacuation planning, etc. Decision-making and cooperation between two or more neighboring municipalities or regions in crisis situation are still rendered difficult because the maps included in the plans differ in scale, colors, map symbols and cartographic design. To improve decision-making process in case of emergency and to reduce the number of human loss and property damages disaster management plans at local and regional level should be supported by detailed thematic maps created in accordance with uniform contents, map symbol system and design. The paper proposes a new symbol system for disaster management that includes a four level hierarchical classification of objects and phenomena according to their type and origin. All objects and phenomena of this classification are divided into five categories: disasters; infrastructure; protection services and infrastructure for protection; affected people and affected infrastructure; operational sites and activities. The symbols of these categories are shown with different background colors and shapes so that they are identifiable. All the symbols have simple but associative design. The new symbol system is used in the design of a series of maps for disaster management at local and regional level.
NASA Technical Reports Server (NTRS)
Huston, R. J. (Compiler)
1982-01-01
The establishment of a realistic plan for NASA and the U.S. helicopter industry to develop a design-for-noise methodology, including plans for the identification and development of promising noise reduction technology was discussed. Topics included: noise reduction techniques, scaling laws, empirical noise prediction, psychoacoustics, and methods of developing and validing noise prediction methods.
32 CFR 525.4 - Entry authorization (policy).
Code of Federal Regulations, 2014 CFR
2014-07-01
... single or multiple entries. (4) Captains of ships and/or marine vessels planning to enter Kwajalein... of passengers (include list when practicable). (vi) Purpose of flight. (vii) Plan of flight route, including the point of origin of flight and its designation and estimated date and times of arrival and...
32 CFR 525.4 - Entry authorization (policy).
Code of Federal Regulations, 2013 CFR
2013-07-01
... single or multiple entries. (4) Captains of ships and/or marine vessels planning to enter Kwajalein... of passengers (include list when practicable). (vi) Purpose of flight. (vii) Plan of flight route, including the point of origin of flight and its designation and estimated date and times of arrival and...
ERIC Educational Resources Information Center
California Univ., Los Angeles. Center for the Study of Evaluation.
This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…
Architecture earth-sheltered buildings: Design Manual 1.4
NASA Astrophysics Data System (ADS)
1984-03-01
Design guidance is presented for use by experienced engineers and architects. The types of buildings within the scope of this manual include slab-on-grade, partially-buried (bermed) or fully-buried, and large (single-story or multistory) structures. New criteria unique to earth-sheltered design are included for the following disciplines: Planning, Landscape Design, Life-Cycle Analysis, Architectural, Structural, Mechanical (criteria include below-grade heat flux calculation procedures), and Electrical.
Thermal Design Overview of the Mars Exploration Rover Project
NASA Technical Reports Server (NTRS)
Tsuyuki, Glenn
2002-01-01
Contents include the following: Mission Overview. Thermal Environments. Driving Thermal Requirements. Thermal Design Approach. Thermal Control Block Diagram. Thermal Design Description. Thermal Analysis Results Summary. Testing Plans. Issues & Concerns.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-11
.... Based on initial comparative research, it appears that the proposed OPM-selected EHB-benchmark plans are... include any discriminatory benefit design elements as defined under 45 CFR 156.125. Response: In response... OPM-selected benchmarks and substitutions not be allowed in States having standard benefit designs...
SELF-INSTRUCTIONAL SUPPLEMENTS FOR A TELEVISED PHYSICS COURSE, STUDY PLAN AND EXPERIMENTAL DESIGN.
ERIC Educational Resources Information Center
KLAUS, DAVID J.; LUMSDAINE, ARTHUR A.
THE INITIAL PHASES OF A STUDY OF SELF-INSTRUCTIONAL AIDS FOR A TELEVISED PHYSICS COURSE WERE DESCRIBED. THE APPROACH, EXPERIMENTAL DESIGN, PROCEDURE, AND TECHNICAL ASPECTS OF THE STUDY PLAN WERE INCLUDED. THE MATERIALS WERE PREPARED TO SUPPLEMENT THE SECOND SEMESTER OF HIGH SCHOOL PHYSICS. THE MATERIAL COVERED STATIC AND CURRENT ELECTRICITY,…
Renovating Interior Office Space: What a Manager Needs To Consider.
ERIC Educational Resources Information Center
Babey, Evelyn R.
When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…
ALS rocket engine combustion devices design and demonstration
NASA Technical Reports Server (NTRS)
Arreguin, Steve
1989-01-01
Work performed during Phase one is summarized and the significant technical and programmatic accomplishments occurring during this period are documented. Besides a summary of the results, methodologies, trade studies, design, fabrication, and hardware conditions; the following are included: the evolving Maintainability Plan, Reliability Program Plan, Failure Summary and Analysis Report, and the Failure Mode and Effect Analysis.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-03
... allows certain uses (including grazing, measures to control fire, insects and disease) to continue in... designation as Wild, Scenic, or Recreational under the Wild and Scenic Rivers Act? What Visual Resource... emergency or fire access; Designating all public lands within the planning area as open, limited, or closed...
The stem cell laboratory: design, equipment, and oversight.
Wesselschmidt, Robin L; Schwartz, Philip H
2011-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources.
Reengineering the Project Design Process
NASA Technical Reports Server (NTRS)
Casani, E.; Metzger, R.
1994-01-01
In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.
26 CFR 1.411(b)(5)-1 - Reduction in rate of benefit accrual under a defined benefit plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... describes safe harbors for certain plan designs (including statutory hybrid plans) that are deemed to... this section. (b) Safe harbors for certain plan designs—(1) Accumulated benefit testing—(i) In general... a participant. Thus, this test involves a comparison of the accumulated benefit of an individual who...
The Use of Common Planning Time: A Case Study of Two Kentucky Schools to Watch
ERIC Educational Resources Information Center
Cook, Christopher M.; Faulkner, Shawn A.
2010-01-01
Interdisciplinary teams with common planning time have been a hallmark of the middle school organizational structure since the 1960s, yet research on the effective use of common planning time is limited. This study explores how interdisciplinary teams at schools designated Kentucky Schools to Watch use common planning time, including the factors…
Defense Utility of Commercial Vessels and Craft.
1980-01-01
competence represented on this Committee include: ship design (naval architecture and marine engineering); marine transportation systems analysis; port...entire maritime industry, * including operators, designers , shipbuilders, suppliers, regulators, and researchers. This report was developed by a...larger commercial vessels now included in military contingency planning or the specially designed ships of the U.S. Navy and U.S. Coast Guard. 0 The
Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan
NASA Technical Reports Server (NTRS)
1972-01-01
A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.
Knight, Andrew T; Driver, Amanda; Cowling, Richard M; Maze, Kristal; Desmet, Philip G; Lombard, Amanda T; Rouget, Mathieu; Botha, Mark A; Boshoff, Andre F; Castley, J Guy; Goodman, Peter S; Mackinnon, Kathy; Pierce, Shirley M; Sims-Castley, Rebecca; Stewart, Warrick I; von Hase, Amrei
2006-06-01
Systematic conservation assessment and conservation planning are two distinct fields of conservation science often confused as one and the same. Systematic conservation assessment is the technical, often computer-based, identification of priority areas for conservation. Conservation planning is composed of a systematic conservation assessment coupled with processes for development of an implementation strategy and stakeholder collaboration. The peer-reviewed conservation biology literature abounds with studies analyzing the performance of assessments (e.g., area-selection techniques). This information alone, however can never deliver effective conservation action; it informs conservation planning. Examples of how to translate systematic assessment outputs into knowledge and then use them for "doing" conservation are rare. South Africa has received generous international and domestic funding for regional conservation planning since the mid-1990s. We reviewed eight South African conservation planning processes and identified key ingredients of best practice for undertaking systematic conservation assessments in a way that facilitates implementing conservation action. These key ingredients include the design of conservation planning processes, skills for conservation assessment teams, collaboration with stakeholders, and interpretation and mainstreaming of products (e.g., maps) for stakeholders. Social learning institutions are critical to the successful operationalization of assessments within broader conservation planning processes and should include not only conservation planners but also diverse interest groups, including rural landowners, politicians, and government employees.
ERIC Educational Resources Information Center
Polo, Marco
2003-01-01
Details the design of the Bahen Centre for Information Technology at the University of Toronto, particularly its emphasis on "green," or sustainable, design. Includes floor plans and photographs. (EV)
Developing a method for estimating AADT on all Louisiana roads.
DOT National Transportation Integrated Search
2015-07-01
Traffic flow volumes present key information needed for making transportation engineering and planning decisions. : Accurate traffic volume count has many applications including: roadway planning, design, air quality compliance, travel : model valida...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
33 CFR 263.15 - Program policies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... undertaken, without regard to time. (b) Applicability of costs to Federal and non-Federal shares. Unless... Corps of Engineers costs for investigations, design, and construction (including costs of supervision... costs of investigations, planning, design and construction, to include those incurred prior to...
Building Your Campus Portal: Advice from the Field.
ERIC Educational Resources Information Center
Krebs, Arlene
2001-01-01
Discusses portal technology in higher education, including planning, design, technical, and financial issues. Highlights include determining the customers; marketing possibilities for the university; ownership issues; data design; effective cost structuring; security issues; adaptability; content; and customer input and feedback. (LRW)
The Comprehensive Dropout Prevention Plan.
ERIC Educational Resources Information Center
Broward County School Board, Fort Lauderdale, FL.
The Comprehensive Dropout Prevention Plan utilizes the resources of Broward County public schools and the community for dropout prevention. A matrix of dropout prevention options has been assembled from both existing programs and from new program designs. General components of the plan include the following: (1) dropout retrieval activities; (2)…
KANSAS STATE PLAN FOR ADULT BASIC EDUCATION.
ERIC Educational Resources Information Center
Kansas State Dept. of Public Instruction, Topeka.
THE KANSAS PLAN IS DESIGNED TO HELP ESTABLISH NEW LOCAL ADULT BASIC EDUCATION PROGRAMS, AND TO EXPAND AND IMPROVE EXISTING ONES. INSTRUCTIONAL CONTENT WILL INCLUDE READING AND WRITING, SPEAKING AND LISTENING SKILLS, CITIZENSHIP, CONSUMER EDUCATION, HUMAN RELATIONS, AND FAMILY LIFE EDUCATION. EARLY STAGES OF PLANNING (TO JUNE 30, 1966) WILL STRESS…
MIPPA: First Broad Changes to Medicare Part D Plan Operations.
LeMasurier, Jean D; Edgar, Babette
2009-04-01
In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.
MIPPA: First Broad Changes to Medicare Part D Plan Operations
LeMasurier, Jean D.; Edgar, Babette
2009-01-01
In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003—the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans. PMID:25126279
A survey of acoustic conditions in semi-open plan classrooms in the United Kingdom.
Greenland, Emma E; Shield, Bridget M
2011-09-01
This paper reports the results of a large scale, detailed acoustic survey of 42 open plan classrooms of varying design in the UK each of which contained between 2 and 14 teaching areas or classbases. The objective survey procedure, which was designed specifically for use in open plan classrooms, is described. The acoustic measurements relating to speech intelligibility within a classbase, including ambient noise level, intrusive noise level, speech to noise ratio, speech transmission index, and reverberation time, are presented. The effects on speech intelligibility of critical physical design variables, such as the number of classbases within an open plan unit and the selection of acoustic finishes for control of reverberation, are examined. This analysis enables limitations of open plan classrooms to be discussed and acoustic design guidelines to be developed to ensure good listening conditions. The types of teaching activity to provide adequate acoustic conditions, plus the speech intelligibility requirements of younger children, are also discussed. © 2011 Acoustical Society of America
What is the best?: simple versus visitor restricted rest period.
Silvius-Byron, Stephanie A; Florimonte, Christine; Panganiban, Elizabeth G; Ulmer, Janice Fitzgerald
2014-05-01
The aim of this study was to compare a highly structured planned rest protocol that includes visitor and healthcare personnel restrictions with a simple planned rest period that encourages patients to rest during a designated time without restriction of visitors and healthcare personnel. Many hospitals acute care have begun to restrict visitors and nonessential health team interventions during specific times despite the lack of experimentally designed studies. Using a convenience sample of 52 intermediate care unit patients, a randomized experimental design study compared a highly structured planned rest protocol with restriction of visitors/healthcare personnel to a simple planned rest period without restrictions. The primary outcome variable was the patient's perceived quality of rest after a 2-hour rest period. Intermediate care patients' perception of rest and sleep during a designated rest period was similar whether elaborate rest strategies were used, including visitor and healthcare personnel restrictions, or if it was only suggested they rest and the door to their room closed. The restriction of visitors and healthcare personnel during a 2-hour rest period did not improve the patient's perception of rest or how long it took them to go to sleep.
RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Annette L. Schafer
2012-06-01
A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses. The plan addressed the potential for gaps to exist in themore » following areas: • Department of Energy Order 435.1, “Radioactive Waste Management,” requirements, including the performance assessment, composite analysis, monitoring plan, performance assessment/composite analysis maintenance plan, and closure plan • Environmental assessment supporting the National Environmental Policy Act • Nuclear safety • Safeguards and security • Emplacement operations • Requirements for commissioning • General project implementation. The reconciliation plan and results of the plan implementation are provided in a business-sensitive project file. This report provides the reconciliation plan and non-business sensitive summary responses to identified gaps.« less
ERIC Educational Resources Information Center
Libby, Amanda
This document presents eight lesson plans designed to teach self-determination and Arizona academic standards to students with disabilities in grades K-12. The lesson plans include: (1) an oral language lesson plan for students with learning disabilities in grades 1-2; (2) a reading acquisition lesson that teaches color words to students with…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-24
... a Maintenance Plan, Including a Contingency Plan, for the Area Under Section 175a of the CAA 1. An.... Contingency Provisions That EPA Deems Necessary to Promptly Correct Any Violation of the NAAQS That Occurs... available control measures, and contingency measures) no longer applies for so long as the area continues to...
The Lunar Mapping and Modeling Project
NASA Technical Reports Server (NTRS)
Noble, Sarah K.; French, R. A.; Nall, M. E.; Muery, K. G.
2009-01-01
The Lunar Mapping and Modeling Project (LMMP) has been created to manage the development of a suite of lunar mapping and modeling products that support the Constellation Program (CxP) and other lunar exploration activities, including the planning, design, development, test and operations associated with lunar sortie missions, crewed and robotic operations on the surface, and the establishment of a lunar outpost. The information provided through LMMP will assist CxP in: planning tasks in the areas of landing site evaluation and selection, design and placement of landers and other stationary assets, design of rovers and other mobile assets, developing terrain-relative navigation (TRN) capabilities, and assessment and planning of science traverses.
ERIC Educational Resources Information Center
Connections, 2002
2002-01-01
Presents an interview with Steven Bingler, an expert on community-based planning and design, about the design of public schools. Topics include the contribution of architecture to student learning, mega- versus small schools, the authentic economics of design decisions, and the role of the community in the design process. (EV)
Designing a New Urban Internet.
ERIC Educational Resources Information Center
Burke, Lauren
2002-01-01
Discusses Web site design and information architecture in light of principles of New Urbanism that are being applied in urban planning situations. Topics include networked electronic environment design; user-centered network design; multidisciplinary approaches; knowledge access and collaboration; and the Global Information Infrastructure…
The Stem Cell Laboratory: Design, Equipment, and Oversight
Wesselschmidt, Robin L.; Schwartz, Philip H.
2013-01-01
This chapter describes some of the major issues to be considered when setting up a laboratory for the culture of human pluripotent stem cells (hPSCs). The process of establishing a hPSC laboratory can be divided into two equally important parts. One is completely administrative and includes developing protocols, seeking approval, and establishing reporting processes and documentation. The other part of establishing a hPSC laboratory involves the physical plant and includes design, equipment and personnel. Proper planning of laboratory operations and proper design of the physical layout of the stem cell laboratory so that meets the scope of planned operations is a major undertaking, but the time spent upfront will pay long-term returns in operational efficiency and effectiveness. A well-planned, organized, and properly equipped laboratory supports research activities by increasing efficiency and reducing lost time and wasted resources. PMID:21822863
Statewide pedestrian and bicycle planning handbook
DOT National Transportation Integrated Search
2014-09-01
This handbook is designed to help State departments of transportation (DOTs) develop or update State pedestrian and bicycle plans. Based on research including interviews with nine State DOTs and critical evaluations of documents from 15 States, this ...
1989-12-01
57 Table 5 Sensitivity Analysis - Point of Pines LPP 61 Table 6 Plan Comparison 64 Table 7 NED Plan Project Costs 96 Table 8 Estimated Operation...Costs 99 Table 13 Selected Plan/Estimated Annual Benefits 101 Table 14 Comparative Impacts - NED Regional Floodgate Plan 102 Table 15 Economic Analysis ...Includes detailed descriptions, plans and profiles and design considerations of the selected plan; coastal analysis of the shorefront; detailed project
Design verification tests for an axial gap permanent magnet compressor motor
NASA Astrophysics Data System (ADS)
Hawsey, R. A.; Bailey, J. M.
1987-07-01
A 30-hp, direct-drive, permanent magnet motor (PMM) has been constructed. The motor is to operate at 15,000 rpm and is designed to drive a Worthington compressor at the US DOE-owned gaseous diffusion plants. The PMM prevents traditional dynamometer testing, including locked rotor current, voltage, and torque measurements. A test plan is presented for data acquisition on the dynamometer test stand in order to calculate the equivalent circuit for the motor. A description of the hardware required for these measurements is included in the plan.
Human-Automation Integration: Principle and Method for Design and Evaluation
NASA Technical Reports Server (NTRS)
Billman, Dorrit; Feary, Michael
2012-01-01
Future space missions will increasingly depend on integration of complex engineered systems with their human operators. It is important to ensure that the systems that are designed and developed do a good job of supporting the needs of the work domain. Our research investigates methods for needs analysis. We included analysis of work products (plans for regulation of the space station) as well as work processes (tasks using current software), in a case study of Attitude Determination and Control Officers (ADCO) planning work. This allows comparing how well different designs match the structure of the work to be supported. Redesigned planning software that better matches the structure of work was developed and experimentally assessed. The new prototype enabled substantially faster and more accurate performance in plan revision tasks. This success suggests the approach to needs assessment and use in design and evaluation is promising, and merits investigatation in future research.
NASA Technical Reports Server (NTRS)
Wilkinson, W. H.; Kirkhart, F. P.; Kistler, C. W.; Duckworth, W. H.; Ungar, E. W.; Foster, E. L.
1970-01-01
Technical problems of design and flight qualification of the proposed classes of surface insulation materials and leading edge materials were reviewed. A screening test plan, a preliminary design data test plan and a design data test plan were outlined. This program defined the apparent critical differences between the surface insulators and the leading edge materials, structuring specialized screening test plans for each of these two classes of materials. Unique testing techniques were shown to be important in evaluating the structural interaction aspects of the surface insulators and a separate task was defined to validate the test plan. In addition, a compilation was made of available information on proposed material (including metallic TPS), previous shuttle programs, pertinent test procedures, and other national programs of merit. This material was collected and summarized in an informally structured workbook.
Space architecture monograph series. Volume 4: Genesis 2: Advanced lunar outpost
NASA Technical Reports Server (NTRS)
Fieber, Joseph P.; Huebner-Moths, Janis; Paruleski, Kerry L.; Moore, Gary T. (Editor)
1991-01-01
This research and design study investigated advanced lunar habitats for astronauts and mission specialists on the Earth's moon. Design recommendations are based on environmental response to the lunar environment, human habitability (human factors and environmental behavior research), transportability (structural and materials system with least mass), constructability (minimizing extravehicular time), construction dependability and resilience, and suitability for NASA launch research missions in the 21st century. The recommended design uses lunar lava tubes, with construction being a combination of Space Station Freedom derived hard modules and light weight Kevlar laminate inflatable structures. The proposed habitat includes research labs and a biotron, crew quarters and crew support facility, mission control, health maintenance facility, maintenance work areas for psychological retreat, privacy, and comtemplation. Furniture, specialized equipment, and lighting are included in the analysis and design. Drawings include base master plans, construction sequencing, overall architectural configuration, detailed floor plans, sections and axonometrics, with interior perspectives.
Thermal area effectiveness for future aircraft
NASA Technical Reports Server (NTRS)
Happ, W. W.
1975-01-01
Problem areas in airport planning, design, and operations identified by a decision matrix developed to display various airport functions interfaced with facilities and an extensive literature survey were investigated. Areas considered include: site selection and growth potential; emissions and noise control/containment for airports; financial and legal aspects of airport planning, contruction, and operation; intra-airport transportation and other passenger flow facilitators; simulation and modeling for airports; guidelines for airport multimodal access planning. Results are summarized and a bibliography is included.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-05-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Seismology software: state of the practice
NASA Astrophysics Data System (ADS)
Smith, W. Spencer; Zeng, Zheng; Carette, Jacques
2018-02-01
We analyzed the state of practice for software development in the seismology domain by comparing 30 software packages on four aspects: product, implementation, design, and process. We found room for improvement in most seismology software packages. The principal areas of concern include a lack of adequate requirements and design specification documents, a lack of test data to assess reliability, a lack of examples to get new users started, and a lack of technological tools to assist with managing the development process. To assist going forward, we provide recommendations for a document-driven development process that includes a problem statement, development plan, requirement specification, verification and validation (V&V) plan, design specification, code, V&V report, and a user manual. We also provide advice on tool use, including issue tracking, version control, code documentation, and testing tools.
Orbit transfer rocket engine technology program. Phase 2: Advanced engine study
NASA Technical Reports Server (NTRS)
Erickson, C.; Martinez, A.; Hines, B.
1987-01-01
In Phase 2 of the Advanced Engine Study, the Failure Modes and Effects Analysis (FMEA) maintenance-driven engine design, preliminary maintenance plan, and concept for space operable disconnects generated in Phase 1 were further developed. Based on the results of the vehicle contractors Orbit Transfer Vehicle (OTV) Concept Definition and System Analysis Phase A studies, minor revisions to the engine design were made. Additional refinements in the engine design were identified through further engine concept studies. These included an updated engine balance incorporating experimental heat transfer data from the Enhanced Heat Load Thrust Chamber Study and a Rao optimum nozzle contour. The preliminary maintenance plan of Phase 1 was further developed through additional studies. These included a compilation of critical component lives and life limiters and a review of the Space Shuttle Main Engine (SSME) operations and maintenance manual in order to begin outlining the overall maintenance procedures for the Orbit Transfer Vehicle Engine and identifying technology requirements for streamlining space-based operations. Phase 2 efforts also provided further definition to the advanced fluid coupling devices including the selection and preliminary design of a preferred concept and a preliminary test plan for its further development.
Safe teleradiology: information assurance as project planning methodology
NASA Astrophysics Data System (ADS)
Collmann, Jeff R.; Alaoui, Adil; Nguyen, Dan; Lindisch, David
2003-05-01
This project demonstrates use of OCTAVE, an information security risk assessment method, as an approach to the safe design and planning of a teleradiology system. By adopting this approach to project planning, we intended to provide evidence that including information security as an intrinsic component of project planning improves information assurance and that using information assurance as a planning tool produces and improves the general system management plan. Several considerations justify this approach to planning a safe teleradiology system. First, because OCTAVE was designed as a method for retrospectively assessing and proposing enhancements for the security of existing information management systems, it should function well as a guide to prospectively designing and deploying a secure information system such as teleradiology. Second, because OCTAVE provides assessment and planning tools for use primarily by interdisciplinary teams from user organizations, not consultants, it should enhance the ability of such teams at the local level to plan safe information systems. Third, from the perspective of sociological theory, OCTAVE explicitly attempts to enhance organizational conditions identified as necessary to safely manage complex technologies. Approaching information system design from the perspective of information security risk management proactively integrates health information assurance into a project"s core. This contrasts with typical approaches that perceive "security" as a secondary attribute to be "added" after designing the system and with approaches that identify information assurance only with security devices and user training. The perspective of health information assurance embraces so many dimensions of a computerized health information system"s design that one may successfully deploy a method for retrospectively assessing information security risk as a prospective planning tool. From a sociological perspective, this approach enhances the general conditions as well as establishes specific policies and procedures for reliable performance of health information assurance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... quality management plans. (1) In order to be approved the POTW Pretreatment Program shall be consistent with any approved water quality management plan developed in accordance with 40 CFR parts 130, 131, as revised, where such 208 plan includes Management Agency designations and addresses pretreatment in a...
ERIC Educational Resources Information Center
PEPNet, 2009
2009-01-01
"Planning for College Success" (PCS) is a curriculum model designed by Sharon Downs, M.S., for a course intended to assist deaf and hard of hearing students during their initial introduction to college life. This program allows students to work one-on-one with a counselor to plan for their college success. The program includes short-term goals and…
Inorganic Analysis in Water Quality Control Programs. Instructor's Guide.
ERIC Educational Resources Information Center
Kroner, Audrey
This two-part instructor's guide was designed for a five-day course for chemists and technicians with little or no experience in inorganic analyses. Part I provides information on course planning and management including course description, staff responsibilities, suggested course plan and agenda, timeline for planning and conducting the course,…
Human Resource Planning: An Introduction. Report 312.
ERIC Educational Resources Information Center
Reilly, Peter
This report is designed to give readers an introduction to the principles of human resource planning (HRP) and the areas in which it can be used, including those facing today's managers. Chapter 1 outlines why some organizations no longer plan, describes the background of change and uncertainty that discouraged them, and defines HRP. Chapter 2…
Athletic Facilities: Planning, Designing, and Operating Today's Physical-Education Centers.
ERIC Educational Resources Information Center
Spoor, Dana L.
1998-01-01
Examines what should be featured in an athletic facility, how to plan for the many different sports and activities that will be housed, and how to get the community involved. Areas addressed include planning for locker rooms and storage, flooring and lighting, building code adherence, spectator seating, building security, and outdoor recreation…
40 CFR 267.112 - What procedures must I follow?
Code of Federal Regulations, 2011 CFR
2011-07-01
.... (1) Events leading to a change in the closure plan, and therefore requiring a modification, may include: (i) A change in the operating plan or facility design; (ii) A change in the expected year of...
Strategy for Alternative Occupant Volume Testing
DOT National Transportation Integrated Search
2009-10-20
This paper describes plans for a series of quasi-static : compression tests of rail passenger equipment. These tests are : designed to evaluate the strength of the occupant volume under : static loading conditions. The research plan includes a detail...
Vehicle management and mission planning systems with shuttle applications
NASA Technical Reports Server (NTRS)
1972-01-01
A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.
ERIC Educational Resources Information Center
Perna, Laura W.
2005-01-01
This article describes what is known from prior research about the impact of student financial aid program design, operations, and marketing on the formation of family (including parents' and children's) college-going aspirations, expectations, and plans, and the resulting college-going behaviors of potential students. The review focuses on the…
Kevin Megown; Andy Lister; Paul Patterson; Tracey Frescino; Dennis Jacobs; Jeremy Webb; Nicholas Daniels; Mark Finco
2015-01-01
The Image-based Change Estimation (ICE) protocols have been designed to respond to several Agency and Department information requirements. These include provisions set forth by the 2014 Farm Bill, the Forest Service Action Plan and Strategic Plan, the 2012 Planning Rule, and the 2015 Planning Directives. ICE outputs support the information needs by providing estimates...
NASA Technical Reports Server (NTRS)
Digman, R. Michael
1988-01-01
The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.
NASA Technical Reports Server (NTRS)
1973-01-01
Design and development efforts for a spaceborne modular computer system are reported. An initial baseline description is followed by an interface design that includes definition of the overall system response to all classes of failure. Final versions for the register level designs for all module types were completed. Packaging, support and control executive software, including memory utilization estimates and design verification plan, were formalized to insure a soundly integrated design of the digital computer system.
Resource Allocation Planning Helper (RALPH): Lessons learned
NASA Technical Reports Server (NTRS)
Durham, Ralph; Reilly, Norman B.; Springer, Joe B.
1990-01-01
The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.
Sustainable urban development in Brisbane City--the Holy Grail?
Rahman, K; Weber, T
2003-01-01
Impacts from urban stormwater runoff on receiving environments have been well documented, particularly through specific regional scientific studies. Using various local government planning and management elements, urban developments in Brisbane City are now able to address stormwater management in an increasingly holistic context. One key initiative includes facilitating Water Sensitive Urban Design (WSUD) components within an Integrated Water Management Strategy that looks at policy formation, planning strategies, design option, community marketing and acceptance, maintenance programs and finally evaluation of various WSUD approaches. These can include the use of Natural Channel Designs, grassed swales, bio-filtration systems, porous pavements and roofwater tanks in several economic combinations. By linking with the Cooperative Research Centre for Catchment Hydrology, Brisbane City Council has influenced the design of WSUD planning tools and benefited the city with academic inputs into extensive evaluation programs. As well, it has also contributed to the Cooperative Research Centre's research outcomes. These evaluation programs are increasingly providing better understanding of various stormwater quality best management practices throughout Australia. As part of the overall implementation process, active involvement by a range of stakeholders has been crucial. These stakeholders have included internal planning, development assessment and design staff, external consultants, developers, and other local and state government agencies. The latter two groups are assisting in the important task of "regionalisation" of Brisbane City Council's policies and guidelines. Implementation of WSUD initiatives and stormwater re-use strategies under Council's new "Integrated Water Management" agenda are showing some excellent results, suggesting that sustainable urban development is no longer like the search for the Holy Grail.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2014 CFR
2014-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2013 CFR
2013-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2012 CFR
2012-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Code of Federal Regulations, 2011 CFR
2011-07-01
..., architectural, legal, fiscal, or economic investigations or studies, surveys, designs, plans, working drawings... such works were designed and constructed. The term operation and maintenance includes replacement...” fittings designed for connection with those facilities. The facilities which convey waste water from...
Fraass, Benedick A.; Steers, Jennifer M.; Matuszak, Martha M.; McShan, Daniel L.
2012-01-01
Purpose: Inverse planned intensity modulated radiation therapy (IMRT) has helped many centers implement highly conformal treatment planning with beamlet-based techniques. The many comparisons between IMRT and 3D conformal (3DCRT) plans, however, have been limited because most 3DCRT plans are forward-planned while IMRT plans utilize inverse planning, meaning both optimization and delivery techniques are different. This work avoids that problem by comparing 3D plans generated with a unique inverse planning method for 3DCRT called inverse-optimized 3D (IO-3D) conformal planning. Since IO-3D and the beamlet IMRT to which it is compared use the same optimization techniques, cost functions, and plan evaluation tools, direct comparisons between IMRT and simple, optimized IO-3D plans are possible. Though IO-3D has some similarity to direct aperture optimization (DAO), since it directly optimizes the apertures used, IO-3D is specifically designed for 3DCRT fields (i.e., 1–2 apertures per beam) rather than starting with IMRT-like modulation and then optimizing aperture shapes. The two algorithms are very different in design, implementation, and use. The goals of this work include using IO-3D to evaluate how close simple but optimized IO-3D plans come to nonconstrained beamlet IMRT, showing that optimization, rather than modulation, may be the most important aspect of IMRT (for some sites). Methods: The IO-3D dose calculation and optimization functionality is integrated in the in-house 3D planning/optimization system. New features include random point dose calculation distributions, costlet and cost function capabilities, fast dose volume histogram (DVH) and plan evaluation tools, optimization search strategies designed for IO-3D, and an improved, reimplemented edge/octree calculation algorithm. The IO-3D optimization, in distinction to DAO, is designed to optimize 3D conformal plans (one to two segments per beam) and optimizes MLC segment shapes and weights with various user-controllable search strategies which optimize plans without beamlet or pencil beam approximations. IO-3D allows comparisons of beamlet, multisegment, and conformal plans optimized using the same cost functions, dose points, and plan evaluation metrics, so quantitative comparisons are straightforward. Here, comparisons of IO-3D and beamlet IMRT techniques are presented for breast, brain, liver, and lung plans. Results: IO-3D achieves high quality results comparable to beamlet IMRT, for many situations. Though the IO-3D plans have many fewer degrees of freedom for the optimization, this work finds that IO-3D plans with only one to two segments per beam are dosimetrically equivalent (or nearly so) to the beamlet IMRT plans, for several sites. IO-3D also reduces plan complexity significantly. Here, monitor units per fraction (MU/Fx) for IO-3D plans were 22%–68% less than that for the 1 cm × 1 cm beamlet IMRT plans and 72%–84% than the 0.5 cm × 0.5 cm beamlet IMRT plans. Conclusions: The unique IO-3D algorithm illustrates that inverse planning can achieve high quality 3D conformal plans equivalent (or nearly so) to unconstrained beamlet IMRT plans, for many sites. IO-3D thus provides the potential to optimize flat or few-segment 3DCRT plans, creating less complex optimized plans which are efficient and simple to deliver. The less complex IO-3D plans have operational advantages for scenarios including adaptive replanning, cases with interfraction and intrafraction motion, and pediatric patients. PMID:22755717
Code of Federal Regulations, 2010 CFR
2010-01-01
... Planning Organization means that organization required by the Department of Transportation, and designated... planning provisions in a Standard Metropolitan Statistical Area. Model Energy Code, 1993, including Errata, means the model building code published by the Council of American Building Officials, which is...
Definition study for variable cycle engine testbed engine and associated test program
NASA Technical Reports Server (NTRS)
Vdoviak, J. W.
1978-01-01
The product/study double bypass variable cycle engine (VCE) was updated to incorporate recent improvements. The effect of these improvements on mission range and noise levels was determined. This engine design was then compared with current existing high-technology core engines in order to define a subscale testbed configuration that simulated many of the critical technology features of the product/study VCE. Detailed preliminary program plans were then developed for the design, fabrication, and static test of the selected testbed engine configuration. These plans included estimated costs and schedules for the detail design, fabrication and test of the testbed engine and the definition of a test program, test plan, schedule, instrumentation, and test stand requirements.
Plant Identification Characteristics for Deciduous Trees & Shrubs. Lesson Plans.
ERIC Educational Resources Information Center
Burkholder, Kathy
This manual contains a group of lesson plans designed for use with a slide series (not included here). Its purpose is to introduce students to the basic concepts and terminology used in the identification of deciduous trees and shrubs. The manual is composed of 12 lesson plans. The first lesson is an introduction to plant identification. The…
Ubibliotheca The Spiral Library.
ERIC Educational Resources Information Center
Ottewell, Guy
A plan for a library with a storage level in the shape of a flat spiral is presented. The advantages of such a plan include: space saving, easy expansion of the building, an unbroken sequence of shelving, quick access to all books and freedom in the design of the library's other sectors. This plan is especially suited for the research library…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-20
... approve a request from the State of Texas to redesignate the Beaumont/Port Arthur (BPA) Texas ozone... making a final determination that the BPA nonattainment area has attained the 1997 8- hour ozone NAAQS... BPA State Implementation Plan (SIP), a 1997 8-hour ozone maintenance plan that includes a 2021 Motor...
ERIC Educational Resources Information Center
Holton, Hazel S.
This curriculum guide is designed to be used by vocational educators in planning, developing, coordinating, and implementing homemaker-health aide programs. It is divided into three parts. Covered first are various aspects of program planning, including planning and organization, the role of the adult educator and the adult learner, and…
ERIC Educational Resources Information Center
Cacy, Roselynn; Smith, Polly
This unit contains lesson plans designed to teach first aid skills to adults with limited language skills. The lesson plans were developed, using the Laubach literacy method, for a workplace literacy project in Anchorage, Alaska. The lesson plans, which are correlated with the book, "You Can Give First Aid," include conversational skills…
Utah's Transition Guidelines for Students at Risk and Students with Mild/Moderate Handicaps.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
These transition guidelines are designed to give Utah school districts direction in planning transition programs for Utah students at risk and/or students with disabilities. The guidelines present best practices in planning to assist these special needs students from school to life in their communities. The five-step process includes planning,…
A Planning Guide for Food Service in Child Care Centers.
ERIC Educational Resources Information Center
Food and Nutrition Service (USDA), Washington, DC.
This publication is designed to help child care center directors and other personnel in programs receiving funding through the Child Care Food Program plan their food service. Included are sections on: (1) planning food for a day; (2) meal patterns (information on the necessary food groups, a chart of vegetables and fruits containing vitamin A, C…
A Framework for Corporate Strategic Planning: Philosophy, Process, and Practice. Paper P-97.
ERIC Educational Resources Information Center
Amara, Roy
The objective of this booklet is to present an integrated picture of the philosophy, process, and practices of strategic planning in an organizational context. It is based on the premise that planning includes the design of a desired future as well as effective ways of bringing it about. Specifically, the document illustrates a planning…
Let's Recycle! Lesson Plans for Grades K-6 and 7-12.
ERIC Educational Resources Information Center
Environmental Protection Agency, Washington, DC. Solid Waste Management Office.
The purpose of this guide is to inform students of solid waste problems and disposal options. Lesson plans deal specifically with waste and recycling and include interdisciplinary approaches to these problems. The manual is divided in two sections - K-6 and 7-12. Activities are designed to allow the teacher maximum flexibility, and plans may be…
Multidisciplinary Analysis and Optimal Design: As Easy as it Sounds?
NASA Technical Reports Server (NTRS)
Moore, Greg; Chainyk, Mike; Schiermeier, John
2004-01-01
The viewgraph presentation examines optimal design for precision, large aperture structures. Discussion focuses on aspects of design optimization, code architecture and current capabilities, and planned activities and collaborative area suggestions. The discussion of design optimization examines design sensitivity analysis; practical considerations; and new analytical environments including finite element-based capability for high-fidelity multidisciplinary analysis, design sensitivity, and optimization. The discussion of code architecture and current capabilities includes basic thermal and structural elements, nonlinear heat transfer solutions and process, and optical modes generation.
Conceptual design of an in-space cryogenic fluid management facility, executive summary
NASA Technical Reports Server (NTRS)
Willen, G. S.; Riemer, D. H.; Hustvedt, D. C.
1981-01-01
The conceptual design of a Spacelab experiment to develop the technology associated with low gravity propellant management is summarized. The preliminary facility definition, conceptual design and design analysis, and facility development plan, including schedule and cost estimates for the facility, are presented.
Research and development plan for the Slagging Pyrolysis Incinerator. [For TRU waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hedahl, T.G.; McCormack, M.D.
1979-01-01
Objective is to develop an incinerator for processing disposed transuranium waste. This R and D plan describes the R and D efforts required to begin conceptual design of the Slagging Pyrolysis Incinerator (Andco-Torrax). The program includes: incinerator, off-gas treatment, waste handling, instrumentation, immobilization analyses, migration studies, regulations, Belgium R and D test plan, Disney World test plan, and remote operation and maintenance. (DLC)
A Measured Approach to Microcomputer Lab Design.
ERIC Educational Resources Information Center
Duggan, Brian
1994-01-01
Explores design considerations for a functional microcomputer lab, including ergonomics and furnishings; access for the disabled; the use of other media; hardware security; and software security, including virus protection. A summary paragraph comments on the role of planning and forecasting. A bibliography of eight titles for further reading is…
Polsky, Daniel; Cidav, Zuleyha; Swanson, Ashley
2016-10-01
The introduction of health insurance Marketplaces under the Affordable Care Act has been associated with growth of restricted provider networks. The value of this plan design strategy, including its association with lower premiums, is uncertain. We used data from all silver plans offered in the 2014 health insurance exchanges in the fifty states and the District of Columbia to estimate the association between the breadth of a provider network and plan premiums. We found that within a market, for plans of otherwise equivalent design and controlling for issuer-specific pricing strategy, a plan with an extra-small network had a monthly premium that was 6.7 percent less expensive than that of a plan with a large network. Because narrow networks remain an important strategy available to insurance companies to offer lower-cost plans on health insurance Marketplaces, the success of health insurance coverage expansions may be tied to the successful implementation of narrow networks. Project HOPE—The People-to-People Health Foundation, Inc.
Accommodating Change: A Case Study in Planning a Sustainable New Business School Building.
ERIC Educational Resources Information Center
Taylor, Lee
2002-01-01
Provides a case study of the planning and design of a new building for the Open University Business School. Goals included an energy-efficient building that would break the paradigm of traditional university working methods. (EV)
Broom, Margaret; Gardner, Anne; Kecskes, Zsuzsoka; Kildea, Sue
2017-07-01
To facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. In 2012, an Australian regional neonatal intensive care unit transitioned from an open-plan to a two-cot neonatal intensive care unit design. Research has reported single- and small-room neonatal intensive care unit design may negatively impact on the distances nurses walk, reducing the time they spend providing direct neonatal care. Studies have also reported nurses feel isolated and need additional support and education in such neonatal intensive care units. Staff highlighted their concerns regarding the impact of the new design on workflow and clinical practice. A participatory action research approach. A participatory action group titled the Change and Networking Group collaborated with staff over a four-year period (2009-2013) to facilitate the transition. The Change and Networking Group used a collaborative, cyclical process of planning, gathering data, taking action and reviewing the results to plan the next action. Data sources included meeting and workshop minutes, newsletters, feedback boards, subgroup reports and a staff satisfaction survey. The study findings include a description of (1) how the participatory action research cycles were used by the Change and Networking Group: providing examples of projects and strategies undertaken; and (2) evaluations of participatory action research methodology and Group by neonatal intensive care unit staff and Change and Networking members. This study has described the benefits of using participatory action research to facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. Participatory action research methodology enabled the inclusion of staff to find solutions to design and clinical practice questions. Future research is required to assess the long-term effect of neonatal intensive care unit design on staff workload, maintaining and supporting a skilled workforce as well as the impact of a new neonatal intensive care unit design on the neonatal intensive care unit culture. A supportive work environment for staff is critical in providing high-quality health care. © 2016 John Wiley & Sons Ltd.
Get Active Orlando: changing the built environment to increase physical activity.
McCreedy, Malisa; Leslie, Jill G
2009-12-01
Active Living by Design's Get Active Orlando partnership (GAO) focused on downtown Orlando's Community Redevelopment Area, including the Parramore Heritage District, home to many low-income and ethnically diverse residents, including many seniors. The area had undergone substantial development, and GAO aimed to incorporate active living considerations into the city's changing landscape. Get Active Orlando conducted a baseline survey of all streets, sidewalks, and bicycle lanes in the project area and identified a sequence of plans and policies in which to incorporate changes identified in the assessment. To create more immediate opportunities for active living, the partnership initiated a senior walking program, a bicycle refurbishment and giveaway program, and community bicycle-riding events, and led a social-marketing campaign that emphasized simple lifestyle changes. Get Active Orlando influenced adoption of public policies supporting active living in Orlando, including the Downtown Transportation Plan, Streetscape Guidelines, Design Standards Review Checklist, and growth management policies. Establishment of the Mayor's Advisory Council on Active Living is testament to the heightened significance of active living in Orlando. Initial assessment data served as a strong platform for policy change. Creating connections across disciplines including land-use planning, transportation, public health, and economic development allowed GAO to secure substantial policy change to influence design of the built environment. Engaging community members, including youth, as leaders was an important factor in program success. The physical environment in Orlando's Community Redevelopment Area is beginning to change as a reflection of a new policy framework designed to support active living.
Pre-Employment Laboratory Education. Home Furnishings/Interior Design Guidebook.
ERIC Educational Resources Information Center
Texas Tech Univ., Lubbock. Home Economics Instructional Materials Center.
This guidebook is designed for use in teaching students enrolled in pre-employment laboratory education (PELE) home furnishing/interior design programs. The first of two major sections includes an overview for teachers on planning, conducting, and evaluating a home furnishings/interior design program. Specific topics discussed in section 1 include…
Optimizing spacecraft design - optimization engine development : progress and plans
NASA Technical Reports Server (NTRS)
Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim
2003-01-01
At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bogue, J; Parsai, E
Purpose: The current generation of inflatable multichannel brachytherapy applicators, such as the Varian Capri, have limited implementation to only vaginal and rectal cancers. While there are similar designs utilizing rigid, non-inflatable applicators, these alternatives could cause increased dose to surrounding tissue due to air gaps. Modification of the Capri could allow for easier treatment planning by reducing the number of channels and increased versatility by modifying the applicator to include an attachable single tandem for cervical or multiple tandems for endometrial applications. Methods: A Varian Capri applicator was simulated in water to replicate a patient. Multiple plans were optimized tomore » deliver a prescribed dose of 100 cGy at 5mm away from the exterior of the applicator using six to thirteen existing channels. The current model was expanded upon to include a detachable tandem or multiple tandoms to increase its functionality to both cervical and endometrial cancers. Models were constructed in both threedimensional rendering software and Monte Carlo to allow prototyping and simulations. Results: Treatment plans utilizing six to thirteen channels produced limited dosimetric differences between channel arrangements, with a seven channel plan very closely approximating the thirteen channels. It was concluded that only seven channels would be necessary in future simulations to give an accurate representation of the applicator. Tandem attachments were prototyped for the applicator to demonstrate the ease of which they could be included. Future simulation in treatment planning software and Monte Carlo results will be presented to further define the ideal applicator geometry Conclusion: The current Capri applicator design could be easily modified to increase applicability to include cervical and endometrial treatments in addition to vaginal and rectal cancers. This new design helps in a more versatile single use applicator that can easily be inserted and to further reduce dose to critical structures during brachytherapy treatments.« less
Control of Technology Transfer at JPL
NASA Technical Reports Server (NTRS)
Oliver, Ronald
2006-01-01
Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software
DOT National Transportation Integrated Search
1979-03-01
This report is a summary of human factors considerations for the planning, : deSign, construction, and implementation of Automated Guideway Transit (AGT) Systems : including Downtown People Mover (DPM) systems. Design concepts such as passenger : saf...
Preliminary design package for solar collector and solar pump
NASA Technical Reports Server (NTRS)
1978-01-01
A solar-operated pump using an existing solar collector, for use on solar heating and cooling and hot water systems is described. Preliminary design criteria of the collector and solar-powered pump is given including: design drawings, verification plans, and hazard analysis.
Designing and Creating Computer-Assisted Instruction.
ERIC Educational Resources Information Center
McMeen, George R.
Designed to encourage the use of a defined methodology and careful planning in creating computer-assisted instructional programs, this paper describes the instructional design process, compares computer-assisted instruction (CAI) and programmed instruction (PI), and discusses pragmatic concerns in computer programming. Topics addressed include:…
Scar-less multi-part DNA assembly design automation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillson, Nathan J.
The present invention provides a method of a method of designing an implementation of a DNA assembly. In an exemplary embodiment, the method includes (1) receiving a list of DNA sequence fragments to be assembled together and an order in which to assemble the DNA sequence fragments, (2) designing DNA oligonucleotides (oligos) for each of the DNA sequence fragments, and (3) creating a plan for adding flanking homology sequences to each of the DNA oligos. In an exemplary embodiment, the method includes (1) receiving a list of DNA sequence fragments to be assembled together and an order in which tomore » assemble the DNA sequence fragments, (2) designing DNA oligonucleotides (oligos) for each of the DNA sequence fragments, and (3) creating a plan for adding optimized overhang sequences to each of the DNA oligos.« less
Space station WP-04 power system. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Hallinan, G. J.
1987-01-01
Major study activities and results of the phase B study contract for the preliminary design of the space station Electrical Power System (EPS) are summarized. The areas addressed include the general system design, man-tended option, automation and robotics, evolutionary growth, software development environment, advanced development, customer accommodations, operations planning, product assurance, and design and development phase planning. The EPS consists of a combination photovoltaic and solar dynamic power generation subsystem and a power management and distribution (PMAD) subsystem. System trade studies and costing activities are also summarized.
V/STOL tilt rotor aircraft study. Volume 5: Definition of stowed rotor research aircraft
NASA Technical Reports Server (NTRS)
Soule, V. A.
1973-01-01
The results of a study of folding tilt rotor (stowed rotor) aircraft are presented. The effects of design cruise speed on the gross weight of a conceptual design stowed rotor aircraft are shown and a comparison is made with a conventional (non-folding) tilt rotor aircraft. A flight research stowed rotor design is presented. The program plans, including costs and schedules, are shown for the research aircraft development and a wind tunnel plan is presented for a full scale test of the aircraft.
38 CFR 39.32 - Plan preparation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...
38 CFR 39.32 - Plan preparation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...
38 CFR 39.32 - Plan preparation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... been no changes. Relevant information may then be shown on the site plan. If required, the site survey.... Boundaries of an unusual nature (curvilinear, off-set, or having other change or direction between corners... the design, including climate, soil conditions, site boundaries, topography, views, hydrology...
Planning Istanbul's Public Library System.
ERIC Educational Resources Information Center
Dokmeci, Vedia; Korca, Perver
1992-01-01
Discussion of the role of public libraries in socioeconomic development focuses on an evaluation of the existing library system in Istanbul (Turkey) and proposes a plan for its balanced development with respect to population distribution and technological advances. Highlights include building design, library automation, and financial…
Technology's Impact on Library Interior Planning.
ERIC Educational Resources Information Center
Michaels, David Leroy
1987-01-01
Discusses issues to be considered in planning a library that will anticipate the needs of the future. Power and telecommunications capacity are stressed, and a checklist of items requiring specific writing services is included. Recommendations for workstation design and structural elements are offered. (MES)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
.... This proposed amendment to the 2006 Land Management Plans is limited in scope and designed to address... Agency (including the Departments of Fish and Game, Parks and Recreation, and Forestry and Fire [[Page...
Lesson Plans To Advance Discussion of Ethical Issues.
ERIC Educational Resources Information Center
Swikle, Randy G.
2002-01-01
Presents lesson plans designed to enable high school students to recognize ethical issues involving the printed media and to give students practical experience in ethical decision-making using the newspaper as a learning tool. Includes 10 ethical issues and related case studies. (RS)
ERIC Educational Resources Information Center
Blaga, Jeff; And Others
Designed primarily for teachers of students in grades 7-12, the document presents over 60 social studies teaching strategies and lesson plans. Each lesson includes an overview, grade level information, suggested course/subject matter uses, objectives, suggested materials, student materials, and an instructional plan. Lesson topics fall into the…
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.
This document contains 19 lesson plans that can be used for career awareness activities in third grade. The lessons were developed by teachers and submitted as part of the Florida Blueprint for Career Preparation. The lesson plans include a topic, materials and information needed, and directions for activities. Lesson plans are designated by…
ERIC Educational Resources Information Center
Upton, Robert
Designed for a 40-hour course in first-responder medical training, this lesson plan teaches students how to control bleeding and bandage wounds. This lesson includes discussions on skin, the circulatory system, and blood; describes seven types of wounds; and explains four bleeding control methods. The lesson plan begins with information on the…
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.
This document contains 17 lesson plans that can be used for career awareness activities in fifth grade. The lessons were developed by teachers and submitted as part of the Florida Blueprint for Career Preparation. The lesson plans include a topic, materials and information needed, and directions for activities. Lesson plans are designated by…
Opening Doors to Postsecondary Education and Training: Planning for Life after High School.
ERIC Educational Resources Information Center
Wisconsin State Dept. of Public Instruction, Madison.
This handbook is designed as a guide to help students with disabilities take another step in preparing for "life after high school." While high school is an exciting time, what you do after high school can be just as exciting if you have done some careful and thoughtful planning. Students'"Transition Plans" include: thinking about their strengths…
Getting Off on the Right Foot in Elementary Art.
ERIC Educational Resources Information Center
Hoff, Ardith
Designed as a guide to planning art lessons, the booklet offers over 40 suggestions and sample lesson plans for students in grades K-6. Although most of the lessons could be taught at any time of year, they are arranged month-by-month for convenience. Included in each monthly program are lesson plans for both intermediate and primary students,…
Urban Space Explorer: A Visual Analytics System for Urban Planning.
Karduni, Alireza; Cho, Isaac; Wessel, Ginette; Ribarsky, William; Sauda, Eric; Dou, Wenwen
2017-01-01
Understanding people's behavior is fundamental to many planning professions (including transportation, community development, economic development, and urban design) that rely on data about frequently traveled routes, places, and social and cultural practices. Based on the results of a practitioner survey, the authors designed Urban Space Explorer, a visual analytics system that utilizes mobile social media to enable interactive exploration of public-space-related activity along spatial, temporal, and semantic dimensions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Ongoing or planned hydro research, results of recent studies, and reviews of new books, publications, and software. Items covered this month include: (1) a recommendation that dam designers give more consideration to earthquake resistance, (2) the development of a new wave rotor design, (3) the development of a small hydro database in China, and (4) an ICOLD bulletin on the optimization of constuction costs.
Design and Status of RERTR Irradiation Tests in the Advanced Test Reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daniel M. Wachs; Richard G. Ambrosek; Gray Chang
2006-10-01
Irradiation testing of U-Mo based fuels is the central component of the Reduced Enrichment for Research and Test Reactors (RERTR) program fuel qualification plan. Several RERTR tests have recently been completed or are planned for irradiation in the Advanced Test Reactor (ATR) located at the Idaho National Laboratory in Idaho Falls, ID. Four mini-plate experiments in various stages of completion are described in detail, including the irradiation test design, objectives, and irradiation conditions. Observations made during and after the in-reactor RERTR-7A experiment breach are summarized. The irradiation experiment design and planned irradiation conditions for full-size plate test are described. Progressmore » toward element testing will be reviewed.« less
ERIC Educational Resources Information Center
Bair, Howard V.; Leland, Henry
To investigate the appropriate design and utilization of physical facilities being constructed as a rehabilitation center, a variety of centers was examined. Conclusions were that flexibility in construction of the physical plant, including nonpermanent walls and fixtures was necessary; program planning should be included in architectural…
PLANNING STUDY--BEHAVIORAL FACTORS IN DENTAL SCHOOL DESIGN. SUMMARY PROGRESS REPORT.
ERIC Educational Resources Information Center
MYRICK, RICHARD
THIS REPORT DISCUSSES ENVIRONMENTAL CONSIDERATIONS IN THE DESIGN OF DENTAL SCHOOL FACILITIES AS RELATED TO THE EDUCATIONAL NEEDS OF STUDENTS AND FACULTY. TWO TYPES OF NEEDS ARE IDENTIFIED--(1) PHYSICAL, INCLUDING A FUNCTIONAL ANALYSIS OF THE PHYSICAL NEEDS IMPOSED BY THE TASKS TO BE DONE, AND (2) PSYCHOLOGICAL, INCLUDING MOTIVATIONAL, SOCIAL, AND…
Network Performance Evaluation Model for assessing the impacts of high-occupancy vehicle facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Janson, B.N.; Zozaya-Gorostiza, C.; Southworth, F.
1986-09-01
A model to assess the impacts of major high-occupancy vehicle (HOV) facilities on regional levels of energy consumption and vehicle air pollution emissions in urban aeas is developed and applied. This model can be used to forecast and compare the impacts of alternative HOV facility design and operation plans on traffic patterns, travel costs, model choice, travel demand, energy consumption and vehicle emissions. The model is designed to show differences in the overall impacts of alternative HOV facility types, locations and operation plans rather than to serve as a tool for detailed engineering design and traffic planning studies. The Networkmore » Performance Evaluation Model (NETPEM) combines several urban transportation planning models within a multi-modal network equilibrium framework including modules with which to define the type, location and use policy of the HOV facility to be tested, and to assess the impacts of this facility.« less
Tang, Jennifer; Lizaola, Elizabeth; Jones, Felica; Brown, Arleen; Stayton, Alix; Williams, Malcolm; Chandra, Anita; Eisenman, David; Fogleman, Stella; Plough, Alonzo
2013-01-01
Community resilience (CR) is a priority for preparedness, but few models exist. A steering council used community-partnered participatory research to support workgroups in developing CR action plans and hosted forums for input to design a pilot demonstration of implementing CR versus enhanced individual preparedness toolkits. Qualitative data describe how stakeholders viewed CR, how toolkits were developed, and demonstration design evolution. Stakeholders viewed community engagement as facilitating partnerships to implement CR programs when appropriately supported by policy and CR resources. Community engagement exercises clarified motivations and informed action plans (e.g., including vulnerable populations). Community input identified barriers (e.g., trust in government) and CR-building strategies. A CR toolkit and demonstration comparing its implementation with individual preparedness were codeveloped. Community-partnered participatory research was a useful framework to plan a CR initiative through knowledge exchange. PMID:23678916
10 CFR 60.21 - Content of application.
Code of Federal Regulations, 2011 CFR
2011-01-01
... accordance with § 73.51 of this chapter. This plan must include the design for physical protection, the... might affect geologic repository operations area design and performance. The description of the site... geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern...
10 CFR 60.21 - Content of application.
Code of Federal Regulations, 2014 CFR
2014-01-01
... accordance with § 73.51 of this chapter. This plan must include the design for physical protection, the... might affect geologic repository operations area design and performance. The description of the site... geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern...
10 CFR 60.21 - Content of application.
Code of Federal Regulations, 2013 CFR
2013-01-01
... accordance with § 73.51 of this chapter. This plan must include the design for physical protection, the... might affect geologic repository operations area design and performance. The description of the site... geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern...
10 CFR 60.21 - Content of application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accordance with § 73.51 of this chapter. This plan must include the design for physical protection, the... might affect geologic repository operations area design and performance. The description of the site... geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern...
10 CFR 60.21 - Content of application.
Code of Federal Regulations, 2012 CFR
2012-01-01
... accordance with § 73.51 of this chapter. This plan must include the design for physical protection, the... might affect geologic repository operations area design and performance. The description of the site... geomechanical, hydrogeologic, and geochemical systems to the maximum design thermal loading, given the pattern...
48 CFR 7.105 - Contents of written acquisition plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...
48 CFR 7.105 - Contents of written acquisition plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...
48 CFR 7.105 - Contents of written acquisition plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... appropriate, discuss the cost model used to develop life-cycle-cost estimates. (ii) Design-to-cost. Describe the design-to-cost objective(s) and underlying assumptions, including the rationale for quantity... of stimulating industry involvement during design and development in recommending the most...
JPL Facilities and Software for Collaborative Design: 1994 - Present
NASA Technical Reports Server (NTRS)
DeFlorio, Paul A.
2004-01-01
The viewgraph presentation provides an overview of the history of the JPL Project Design Center (PDC) and, since 2000, the Center for Space Mission Architecture and Design (CSMAD). The discussion includes PDC objectives and scope; mission design metrics; distributed design; a software architecture timeline; facility design principles; optimized design for group work; CSMAD plan view, facility design, and infrastructure; and distributed collaboration tools.
Visual display aid for orbital maneuvering - Design considerations
NASA Technical Reports Server (NTRS)
Grunwald, Arthur J.; Ellis, Stephen R.
1993-01-01
This paper describes the development of an interactive proximity operations planning system that allows on-site planning of fuel-efficient multiburn maneuvers in a potential multispacecraft environment. Although this display system most directly assists planning by providing visual feedback to aid visualization of the trajectories and constraints, its most significant features include: (1) the use of an 'inverse dynamics' algorithm that removes control nonlinearities facing the operator, and (2) a trajectory planning technique that separates, through a 'geometric spreadsheet', the normally coupled complex problems of planning orbital maneuvers and allows solution by an iterative sequence of simple independent actions. The visual feedback of trajectory shapes and operational constraints, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool provides an example of operator-assisted optimization of nonlinear cost functions.
The Institutional Research Practitioner: A Guidebook to Effective Performance.
ERIC Educational Resources Information Center
Clagett, Craig A.; Huntington, Robin B.
Designed for institutional researchers, this handbook provides practical guidelines for the operation of an effective research office. Chapter I defines institutional research and describes tasks a research office may undertake, including strategic planning support, budget development, facilities planning, personnel and staffing analyses,…
40 CFR 35.2214 - Grantee responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... responsibilities. (a) The grantee shall complete the project in accordance with the grant agreement including: The facilities plan that establishes the need for the project; the design drawings and specifications; the plan... treatment works; the project schedule; and all other applicable regulations. The grantee shall maintain and...
45 CFR 205.37 - Responsibilities of the Administration for Children and Families (ACF).
Code of Federal Regulations, 2013 CFR
2013-10-01
... Processing and Information Retrieval System Guide. The initial advance automatic data processing planning... description of the proposed statewide management system, including the description of information flows, input..., review, assess, and inspect the planning, design, and operation of, statewide management information...
Temperature Control. Honeywell Planning Guide.
ERIC Educational Resources Information Center
Honeywell, Inc., Minneapolis, Minn.
Presents planning considerations in selecting proper temperature control systems. Various aspects are discussed including--(1) adequate environmental control, (2) adequate control area, (3) control system design, (4) operators rate their systems, (5) type of control components, (6) basic control system, (7) automatic control systems, and (8)…
ERIC Educational Resources Information Center
Murphy, Jim
1980-01-01
The planned corporate office building for Hooker Chemicals and Plastics Corporation in Niagara Falls (New York) is designed to have an inner skin and an outer one four feet from it. Operable louvers will be located between the membranes. An energy analysis of the planned building is included. (Author/MLF)
ERIC Educational Resources Information Center
Fidell, Jeannette A.; Horn, Valerie
The eleven lesson plans outlined in this booklet are designed to stimulate and challenge both underachievers and reluctant readers by helping them learn to read "The New York Times." The lesson plans include the following: exercises in vocabulary enrichment; exercises for developing dictionary skills; topics for oral reports; topics for…
Technical and Occupational Shops.
ERIC Educational Resources Information Center
Ontario Dept. of Education, Toronto. School Planning and Building Research Section.
This booklet presents suggested plans and specifications for and discusses facilities common to technical and occupational shops. Drawings, room plans, and text illustrate specifications for drafting rooms, a welding shop, an automechanics shop, an auto body shop, and a high school greenhouse. Also included are facility designs for agricultural…
Developing Community-Level Policy and Practice to Reduce Traffic-Related Air Pollution Exposure
Brugge, Doug; Patton, Allison P.; Bob, Alex; Reisner, Ellin; Lowe, Lydia; Bright, Oliver-John M.; Durant, John L.; Newman, Jim; Zamore, Wig
2016-01-01
The literature consistently shows associations of adverse cardiovascular and pulmonary outcomes with residential proximity to highways and major roadways. Air monitoring shows that traffic-related pollutants (TRAP) are elevated within 200–400 m of these roads. Community-level tactics for reducing exposure include the following: 1) HEPA filtration; 2) Appropriate air-intake locations; 3) Sound proofing, insulation and other features; 4) Land-use buffers; 5) Vegetation or wall barriers; 6) Street-side trees, hedges and vegetation; 7) Decking over highways; 8) Urban design including placement of buildings; 9) Garden and park locations; and 10) Active travel locations, including bicycling and walking paths. A multidisciplinary design charrette was held to test the feasibility of incorporating these tactics into near-highway housing and school developments that were in the planning stages. The resulting designs successfully utilized many of the protective tactics and also led to engagement with the designers and developers of the sites. There is a need to increase awareness of TRAP in terms of building design and urban planning. PMID:27413416
ERIC Educational Resources Information Center
Gilyard, Burl
2002-01-01
Describes the design of the University of Minnesota's expansion of its Gibson-Nagurski Football Complex, which included a new entrance (the Hall of Traditions) and weight-training gym. Includes the floor plan and photographs. (EV)
Design for effective development and prototyping of the HL-20
NASA Astrophysics Data System (ADS)
Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.
1993-10-01
A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.
Preliminary design package for solar heating and hot water system
NASA Technical Reports Server (NTRS)
1976-01-01
Two prototype solar heating and hot water systems for use in single-family dwellings or commercial buildings were designed. Subsystems included are: collector, storage, transport, hot water, auxiliary energy, and government-furnished site data acquisition. The systems are designed for Yosemite, California, and Pueblo, Colorado. The necessary information to evaluate the preliminary design for these solar heating and hot water systems is presented. Included are a proposed instrumentation plan, a training program, hazard analysis, preliminary design drawings, and other information about the design of the system.
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 6 2013-10-01 2013-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 6 2014-10-01 2014-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 6 2012-10-01 2012-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
49 CFR 451.12 - Application for approval by design type.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 6 2011-10-01 2011-10-01 false Application for approval by design type. 451.12... Approval of New Containers § 451.12 Application for approval by design type. (a) For approval of new containers by design type, each application must include the following: (1) Engineering drawings and plans...
Securing your family's future: the value of estate planning.
Rinaldi, Ellen; Shin, Alisa M
2006-08-01
The authors provide an overview of general estate planning considerations, including minimization of federal estate taxes, estate planning techniques to be used to meet specific goals, and guidelines to ensure a well-drafted and well-organized plan. They also stress the importance of planning for incapacity. A well-thought-out and sound estate plan protects assets, minimizes estate taxes, ensures appropriate distribution to designated beneficiaries and prepares family members and business partners. In developing an estate plan, dentists should seek professional advice from a qualified attorney and a certified financial planner. Practice Implications. A sound estate plan should address business continuation or disposition with respect to the dental practice.
Reengineering the project design process
NASA Astrophysics Data System (ADS)
Kane Casani, E.; Metzger, Robert M.
1995-01-01
In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.
Human Health and Performance Aspects of the Mars Design Reference Mission
NASA Technical Reports Server (NTRS)
Charles, John B.
2000-01-01
This paper will describe the current planning for exploration-class missions, emphasizing the medical, and human factors aspects of such expeditions. The details of mission architecture are still under study, but a typical Mars design reference mission comprises a six-month transit from Earth to Mar, eighteen months in residence on Mars, and a six-month transit back to Earth. Physiological stressors will include environmental factors such as prolonged exposure to radiation, weightlessness in transit, and hypogravity and a toxic atmosphere while on Mars. Psychological stressors will include remoteness from Earth, confinement, and potential interpersonal conflicts, all complicated by circadian alterations. Medical risks including trauma must also be considered. Results of planning for assuring human health and performance will be presented.
Demonstration of decomposition and optimization in the design of experimental space systems
NASA Technical Reports Server (NTRS)
Padula, Sharon; Sandridge, Chris A.; Haftka, Raphael T.; Walsh, Joanne L.
1989-01-01
Effective design strategies for a class of systems which may be termed Experimental Space Systems (ESS) are needed. These systems, which include large space antenna and observatories, space platforms, earth satellites and deep space explorers, have special characteristics which make them particularly difficult to design. It is argued here that these same characteristics encourage the use of advanced computer-aided optimization and planning techniques. The broad goal of this research is to develop optimization strategies for the design of ESS. These strategics would account for the possibly conflicting requirements of mission life, safety, scientific payoffs, initial system cost, launch limitations and maintenance costs. The strategies must also preserve the coupling between disciplines or between subsystems. Here, the specific purpose is to describe a computer-aided planning and scheduling technique. This technique provides the designer with a way to map the flow of data between multidisciplinary analyses. The technique is important because it enables the designer to decompose the system design problem into a number of smaller subproblems. The planning and scheduling technique is demonstrated by its application to a specific preliminary design problem.
Satellite Power Systems (SPS) concept definition study (exhibit C)
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1978-01-01
A coplanar satellite conceptual approach was defined. This effort included several trade studies related to satellite design and also construction approaches for this satellite. A transportation system, consistent with this concept, was also studied, including an electric orbit transfer vehicle and a parallel-burn heavy lift launch vehicle. Work on a solid state microwave concept continued and several alternative approaches were evaluated. Computer determination of an optimized transistor and circuit design was also continued. Experiment/verification planning resulted in the development of a total solar array and microwave technology development plan, as well as definition of near-term research to evaluate key technology issues.
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
Designing cost effective water demand management programs in Australia.
White, S B; Fane, S A
2002-01-01
This paper describes recent experience with integrated resource planning (IRP) and the application of least cost planning (LCP) for the evaluation of demand management strategies in urban water. Two Australian case studies, Sydney and Northern New South Wales (NSW) are used in illustration. LCP can determine the most cost effective means of providing water services or alternatively the cheapest forms of water conservation. LCP contrasts to a traditional approach of evaluation which looks only at means of increasing supply. Detailed investigation of water usage, known as end-use analysis, is required for LCP. End-use analysis allows both rigorous demand forecasting, and the development and evaluation of conservation strategies. Strategies include education campaigns, increasing water use efficiency and promoting wastewater reuse or rainwater tanks. The optimal mix of conservation strategies and conventional capacity expansion is identified based on levelised unit cost. IRP uses LCP in the iterative process, evaluating and assessing options, investing in selected options, measuring the results, and then re-evaluating options. Key to this process is the design of cost effective demand management programs. IRP however includes a range of parameters beyond least economic cost in the planning process and program designs, including uncertainty, benefit partitioning and implementation considerations.
30 CFR 816.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... activities include diversion ditches, siltation structures, or roads that are designed constructed and... designed and as approved in the reclamation plan. (4) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this chapter. (5) Siltation structures...
30 CFR 817.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... activities include diversion ditches, siltation structures, or roads that are designed, constructed and... surveyor, to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 817.49 of...
30 CFR 816.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...
30 CFR 816.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...
30 CFR 816.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...
30 CFR 816.46 - Hydrologic balance: Siltation structures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities include diversion ditches, siltation structures, or roads that are designed constructed and..., to be constructed as designed and as approved in the reclamation plan. (3) Any siltation structure which impounds water shall be designed, constructed and maintained in accordance with § 816.49 of this...
A Case Study in Acoustical Design.
ERIC Educational Resources Information Center
Ledford, Bruce R.; Brown, John A.
1992-01-01
Addresses concerns of both facilities planners and instructional designers in planning for the audio component of group presentations. Factors in the architectural design of enclosures for the reproduction of sound are described, including frequency, amplitude, and reverberation; and a case study for creating an acceptable enclosure is presented.…
Kernel-based Linux emulation for Plan 9.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minnich, Ronald G.
2010-09-01
CNKemu is a kernel-based system for the 9k variant of the Plan 9 kernel. It is designed to provide transparent binary support for programs compiled for IBM's Compute Node Kernel (CNK) on the Blue Gene series of supercomputers. This support allows users to build applications with the standard Blue Gene toolchain, including C++ and Fortran compilers. While the CNK is not Linux, IBM designed the CNK so that the user interface has much in common with the Linux 2.0 system call interface. The Plan 9 CNK emulator hence provides the foundation of kernel-based Linux system call support on Plan 9.more » In this paper we discuss cnkemu's implementation and some of its more interesting features, such as the ability to easily intermix Plan 9 and Linux system calls.« less
Development of a Software Tool to Automate ADCO Flight Controller Console Planning Tasks
NASA Technical Reports Server (NTRS)
Anderson, Mark G.
2011-01-01
This independent study project covers the development of the International Space Station (ISS) Attitude Determination and Control Officer (ADCO) Planning Exchange APEX Tool. The primary goal of the tool is to streamline existing manual and time-intensive planning tools into a more automated, user-friendly application that interfaces with existing products and allows the ADCO to produce accurate products and timelines more effectively. This paper will survey the current ISS attitude planning process and its associated requirements, goals, documentation and software tools and how a software tool could simplify and automate many of the planning actions which occur at the ADCO console. The project will be covered from inception through the initial prototype delivery in November 2011 and will include development of design requirements and software as well as design verification and testing.
The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements
NASA Technical Reports Server (NTRS)
Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray
2012-01-01
In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.
ERIC Educational Resources Information Center
New Hampshire State Dept. of Education, Concord.
This guide is designed as an outline of the means to broaden the context of education within a community and to serve its needs through community involvement in educational program planning. Part 1 is a discussion of the need and means for community collaboration, including maximizing use of existing educational facilities and community resources…
Water Infrastructure Adaptation in New Urban Design: Possibilities and Constraints
Natural constraints, including climate change and dynamic socioeconomic development, can significantly impact the way we plan, design, and operate water infrastructure, thus its sustainability to deliver reliable quality water supplies and comply with environmental regulations. ...
DEVELOPMENT OF EXPOSURE ASSESSMENT STUDY DESIGN FOR THE NATIONAL CHILDREN'S STUDY (NCS)
The general plan for the exposure monitoring component of the planned National Children's Study (NCS) is to measure indoor and outdoor concentrations and personal exposures for a variety of pollutants, including combustion products and pesticides. Due to the size of the study,...
40 CFR 262.102 - What special definitions are included in this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS APPLICABLE TO GENERATORS OF HAZARDOUS WASTE University... particularly hazardous substances as designated in a University's Chemical Hygiene Plan under OSHA, or... Management Plan (EMP) means a written program developed and implemented by the university which sets forth...
Including the Consumer and Environment in Occupational Therapy Treatment Planning.
ERIC Educational Resources Information Center
Brown, Catana; Bowen, Robin E.
1998-01-01
Occupational therapists (n=29) completed treatment plans based on case study data. Analysis indicated they often identified goals not addressed by the consumer/client. They significantly selected more simulated than real activities and more activities designed to change the person rather than the environment. (SK)
IP Sample Plan #4 | NCI Technology Transfer Center | TTC
Sample letter from Research Institutes and their principal investigator and consultants, describing a data and research tool sharing plan and procedures for sharing data, research materials, and patent and licensing of intellectual property. This letter is designed to be included as part of an application.
Planning Educational Small Computer Systems.
ERIC Educational Resources Information Center
Kiser, Chester
This paper defines problems of school officials in dealing with the new information society, and suggests a planning framework applicable to the design of school and district microcomputer systems. Educators' problems in addressing the demands and opportunities of the emergent information society include inadequate comprehension of a major shift…
ERIC Educational Resources Information Center
Williamson, Susan
1999-01-01
Describes the campus design of the University of Houston (Texas) as an example of an urban campus where space is limited; the siting of new buildings was straightforward; and the planning focused on the campus' identity, accessibility, and enhancement. Two drawings of the campus layout from the master plan are included. (GR)
ERIC Educational Resources Information Center
Bessemer, David W.; Shrage, Jules H.
Recommendations for an alternative plan, based on typological analysis techniques, for the evaluation of student characteristics related to media, presentation design, and academic performance are presented. Difficulties with present evaluation plans are discussed, and different methods of typological analysis are described. Included are…
40 CFR 62.13108 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Industrial Solid Waste Incineration Units. The State Plan includes revisions to Rule 102 and Rule 405 of the... Industrial Solid Waste Incineration Units for which construction commenced on or before November 30, 1999... Control of Air Emissions of Designated Pollutants from Existing Commercial and Industrial Solid Waste...
40 CFR 51.111 - Description of control measures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Control Strategy § 51.111 Description of control measures. Each plan must set forth a control strategy which includes the following: (a... designation of agency responsibility for enforcement of implementation. (b) [Reserved] [51 FR 40665, Nov. 7...
Scoliosis Screening in Schools.
ERIC Educational Resources Information Center
New York State Education Dept., Albany. Div. of Pupil Personnel Services.
The booklet outlines New York state school policy and procedures for screening students for scoliosis, lateral curvature of the spine. It is explained that screening is designed to discover spinal deformities early enough to prevent surgery. Planning aspects, including organizing a planning team for the school district, are discussed. Among…
40 CFR 52.70 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Hearings, Written Testimony, etc. I-2 Recommendations for attainment/Nonattainment designations II-1 Alaska... for the Fairbanks Municipal Utilities System IV-3 Testing Procedures V-1 Air Quality Data An amended... Control Plan Amendment (which includes Appendix A the Alaska Statutes Title 46, Chapter 14, Article 3...
Observation Skills - Tuning Up the Five Senses.
ERIC Educational Resources Information Center
Mason, Fred J.
Lesson plans designed to increase the observation skills for intermediate elementary students and provide them with a variety of sensory experiences in learning situations are presented in this document. Lesson plans include objectives, outlines for both indoor and outdoor learning experiences, materials and equipment needed, and evaluation…
[Design of a plan for patient safety in pediatric surgery service].
Paredes Esteban, R M; Castillo Fernández, A L; Miñarro del Moral, R; Garrido Pérez, J I; Granero Cendón, R; Gómez Beltrán, O; Berenguer Garcia, M J; Tejedor Fernández, M
2014-10-01
Patient safety is a key priority in quality management for healthcare services providers. Every patient is entitled to receive safe and effective healthcare. The aim of this study was to design a patient safety plan for a Paediatric Surgery Department. We carried out a literature review and we established a work group that included healthcare professionals from the Paediatric Surgery Department and the Quality and Medical Records Department. The group identified potential adverse events, failures and causes and established a rating using Failure Mode Effects Analysis. Potential risks were mapped out and a plan was designed establishing actions to reduce risks. We designated leaders to ensure the effective implementation of the plan. A total of 58 adverse events were identified in the Paediatric Surgery Department. We detected 128 failures that were produced by 211 different causes. The group developed a proposal with 424 specific measures to carry out preventive and/or remedial actions that were then narrowed down to 322. The group designed a plan to apply the programme, which is currently being implemented. The methodology used enabled obtaining key information for improvement of patient safety and developing preventive and/or remedial actions. These measures are applicable in practice, as they were designed using proposals and agreements with professionals that take active part in the care of children with surgical conditions.
Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick
The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in FY 2013 (Kelly et al. 2013). The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance and other surveillance findings, as well as results of the lifetime extension studies (Blair et al. 2012, Weis et al. 2015a).more » The LANL SAVY-4000 Field Surveillance Plan Update was issued in 2014 (Kelly et al. 2014). This 2016 update reflects changes to the surveillance plan resulting from restrictions on handling residue materials greater than 500 g, the addition of specific engineering judgment containers, and 2015 surveillance findings. The SAVY-4000 container has a design life of five years, which was chosen as a conservative estimate of the functional properties of the materials used in the construction of the SAVY 4000 when exposed to the potential insults including temperature, corrosive materials and gases, and radiation. The SAVY-4000 container design basis is described in a safety analysis report (Anderson et al. 2013). In the National Nuclear Security Administration's (NNSA’s) approval of the safety analysis report, it was recommended that the design life clock begin on March 2014 (Nez et al. 2014). However, it is expected that a technical basis can be developed to extend the design life of the SAVY-4000 containers to approximately 40 years (Blair et al. 2012, Weis et al. 2015a). This surveillance plan update covers five years (2015–2019) and is developed to ensure SAVY-4000 containers meet their design criteria over the current five-year design life and to gather data that can be used in developing the technical basis for a 40-year design life. The technical basis for the longer design life will be developed based on the results of this surveillance plan and the concurrent lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). A long-term surveillance plan will be developed by the completion of this plan and will be based on the results of the first several years of this five-year surveillance plan and the lifetime extension studies. In addition, the current Hagan container population is so large (approximately 3,500 LANL-wide, approximately 3,000 in PF-4) that it is anticipated Hagan containers will be in use for many years to come. Therefore, this plan includes surveillance activities for the Hagan container system during the time it takes to replace the Hagan containers with manually-compliant containers such as the SAVY 4000. These Hagan examinations not only provide information to determine if additional Hagan surveillance is needed, but also support SAVY lifetime-extension studies because some of the container components are made from similar material (e.g., stainless steel and Viton).« less
Designing-and Redesigning-Information Services for Maximum Impact.
ERIC Educational Resources Information Center
Jones, Rebecca; Dysart, Jane
2002-01-01
Discusses innovative information services, including new services and the redesign of existing services. Describes the development process, including assessing the market and developing a marketing plan; and explains the implementation process, including monitoring client satisfaction and quality control. (LRW)
International Photovoltaic Program Plan. Volume II. Appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Costello, D.; Koontz, R.; Posner, D.
1979-12-01
This second volume of a two-part report on the International Photovoltaic Program Plan contains appendices summarizing the results of analyses conducted in preparation of the plan. These analyses include compilations of relevant statutes and existing Federal programs; strategies designed to expand the use of photovoltaics abroad; information on the domestic photovoltaic plan and its impact on the proposed international plan; perspectives on foreign competition; industry views on the international photovoltaic market and ideas about how US government actions could affect this market; international financing issues; and information on issues affecting foreign policy and developing countries.
Office design and health: a systematic review.
Richardson, Ann; Potter, John; Paterson, Margaret; Harding, Thomas; Tyler-Merrick, Gaye; Kirk, Ray; Reid, Kate; McChesney, Jane
2017-12-15
To carry out a systematic review of recent research into the effects of workplace design, comparing individual with shared workspaces, on the health of employees. The research question was "Does workplace design (specifically individual offices compared with shared workspaces) affect the health of workers?" A literature search limited to articles published between 2000 and 2017 was undertaken. A systematic review was carried out, and the findings of the reviewed studies grouped into themes according to the primary outcomes measured in the studies. The literature search identified 15 relevant studies addressing health effects of shared or open-plan offices compared with individual offices. Our systematic review found that, compared with individual offices, shared or open-plan office space is not beneficial to employees' health, with consistent findings of deleterious effects on staff health, wellbeing and productivity. Our findings are also consistent with those of earlier reviews. These findings have public health implications for the New Zealand workforce. Decisions about workplace design should include weighing the short-term financial benefits of open-plan or shared workspaces against the significant harms, including increased sickness absence, lower job satisfaction and productivity, and possible threats to recruitment and retention of staff.
Designing Environments for Handicapped Children: A Design Guide and Case Study. First Edition.
ERIC Educational Resources Information Center
Moore, Gary T.; And Others
This guide addresses the planning and architectural design of play/learning environments for special needs children. The exceptional children discussed include those with most types of mild to severe handicaps and developmental disabilities. Specifically excluded from consideration are health impairments, severe psycho-emotional difficulties such…
Planning activity for internally generated reward goals in monkey amygdala neurons
Schultz, Wolfram
2015-01-01
The best rewards are often distant and can only be achieved by planning and decision-making over several steps. We designed a multi-step choice task in which monkeys followed internal plans to save rewards towards self-defined goals. During this self-controlled behavior, amygdala neurons showed future-oriented activity that reflected the animal’s plan to obtain specific rewards several trials ahead. This prospective activity encoded crucial components of the animal’s plan, including value and length of the planned choice sequence. It began on initial trials when a plan would be formed, reappeared step-by-step until reward receipt, and readily updated with a new sequence. It predicted performance, including errors, and typically disappeared during instructed behavior. Such prospective activity could underlie the formation and pursuit of internal plans characteristic for goal-directed behavior. The existence of neuronal planning activity in the amygdala suggests an important role for this structure in guiding behavior towards internally generated, distant goals. PMID:25622146
40 CFR 52.1960 - Original Identification of plan section.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...
40 CFR 52.1960 - Original Identification of plan section.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...
40 CFR 52.1960 - Original Identification of plan section.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...
40 CFR 52.1960 - Original Identification of plan section.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., 1972. (Non-regulatory) (7) Sections 16.1, 16.3, and 16.5 of Regulation No. 16, “Control of Emissions of... plan revision designed to achieve the ozone standard in Tulsa County, including control strategy... Quality Control Implementation Plan” and all revisions submitted by Oklahoma that were federally approved...
NASA Technical Reports Server (NTRS)
1979-01-01
A plan for the production of two PEP flight systems is defined. The task's milestones are described. Provisions for the development and assembly of new ground support equipment required for both testing and launch operations are included.
Rewiring a Working Library or Teaching an Old Dog New Tricks.
ERIC Educational Resources Information Center
White, Robert L.; Jaffe, Lee David
1995-01-01
This case study describes the planning, funding, and implementation of a complete data-wiring renovation at the University of California, Santa Cruz library. Highlights include design principles; project schedule; benefits for staff's electronic mail and network use and for upgraded public terminals; and the importance of planning and…
"Madame Bovary": Illusion and Reality. [Lesson Plan].
ERIC Educational Resources Information Center
Carangelo, Audrey
Based on Gustave Flaubert's novel "Madame Bovary," this lesson plan presents activities designed to help students explore the theme of "illusion versus reality" in the novel; identify and list alternate themes in the novel; and cite specific examples of illusion versus reality from the novel. It includes objectives, materials, procedures,…
PLANNING THE INDOOR PHYSICAL EDUCATION FACILITIES.
ERIC Educational Resources Information Center
HASE, GERALD J.; HICK, BASIL L.
THIS PAMPHLET IS DESIGNED TO HELP ARCHITECTS AND LOCAL SCHOOL OFFICIALS IN THE PREPARATION OF PLANS FOR PHYSICAL EDUCATION FACILITIES IN NEW AND EXISTING BUILDINGS. FACILITIES MENTIONED INCLUDE--(1) GYMNASIUM, (2) SWIMMING POOL, (3) SMALL GROUP ACTIVITY ROOM, (4) DRESSING AND SHOWERING ROOMS, (5) TEAM ROOM, (6) EQUIPMENT DRYING ROOM, (7) LAUNDRY…
Planning Curriculum Development: With Examples from Projects for the Mentally Retarded.
ERIC Educational Resources Information Center
Mayer, William V., Ed.
Presented are guidelines based on five federally funded projects for planning and developing curriculum for the mentally retarded. Discussed are the initial steps of identifying the target population, needs, and objectives. Examples of curriculum design, including the rationale and conceptual framework, are provided. Considered are elements of…
MANUAL OF PLANNING STANDARDS FOR SCHOOL BUILDINGS.
ERIC Educational Resources Information Center
New York State Education Dept., Albany.
THIS MANUAL CONTAINS THE REQUIREMENTS AND RECOMMENDATIONS FOR DEVELOPMENT AND DESIGN IN ERECTION, REPAIR, ENLARGEMENT, AND REMODELING OF SCHOOL BUILDINGS, IN TERMS OF HEALTH, COMFORT, AND SAFETY OF PUPILS ATTENDING THE PUBLIC SCHOOLS. SPECIFIC AREAS COVERED BY THIS MANUAL INCLUDE--(1) STRUCTURE AND SAFETY PLANNING, (2) MATERIALS, (3) VISUAL…
32 CFR 525.4 - Entry authorization (policy).
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Captains of ships and/or marine vessels planning to enter Kwajalein Missile Range shall not knowingly... when practicable). (vi) Purpose of flight. (vii) Plan of flight route, including the point of origin of flight and its designation and estimated date and times of arrival and departure of airspace covered by...
32 CFR 525.4 - Entry authorization (policy).
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Captains of ships and/or marine vessels planning to enter Kwajalein Missile Range shall not knowingly... when practicable). (vi) Purpose of flight. (vii) Plan of flight route, including the point of origin of flight and its designation and estimated date and times of arrival and departure of airspace covered by...
32 CFR 525.4 - Entry authorization (policy).
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Captains of ships and/or marine vessels planning to enter Kwajalein Missile Range shall not knowingly... when practicable). (vi) Purpose of flight. (vii) Plan of flight route, including the point of origin of flight and its designation and estimated date and times of arrival and departure of airspace covered by...
Extending Volunteer Programs in Schools.
ERIC Educational Resources Information Center
Hedges, Henry G.
Documented here is a project involving three extensions or adaptations for using volunteers in schools. The first adaptation involves a plan for meeting certain major needs of a secondary school with volunteer help. This plan includes components designed to reorganize the secondary school curriculum to allow some of the students to study aspects…
Developing and Monitoring Individual Education Plans for Handicapped Children.
ERIC Educational Resources Information Center
Armstrong, Mary Lee
The practicum was designed to develop, implement, monitor, and evaluate a management system for developing and monitoring individual education plans (IEPs) for handicapped children as mandated by P.L. 94-142, the Education for All Handicapped Children Act. The products included an expectancy formula for educable mentally retarded (EMR) and…
Considerations Before Writing a Public Library Building Program in Children's Services.
ERIC Educational Resources Information Center
Hektoen, Faith
Designed to be useful for the assessment of existing collections and facilities as well as for planning new libraries, these guidelines detail specific needs, considerations and possibilities, and specifications for both materials and area planning. The materials section includes separate treatment for various types of books and other…
Safety Factors in Educational Facilities. An Annotated Reference List.
ERIC Educational Resources Information Center
Wakefield, Howard E.
Abstracts and descriptor terms are presented for 26 selected references with safety orientation. Included in addition to several general planning handbooks are topics related to--(1) stairways, (2) air structures, (3) site planning, (4) lighting, (5) bidding practice, (6) physically handicapped, (7) laboratory design, (8) mobile classrooms, (9)…
Ten Commandments for Microcomputer Facility Planners.
ERIC Educational Resources Information Center
Espinosa, Leonard J.
1991-01-01
Presents factors involved in designing a microcomputer facility, including how computers will be used in the instructional program; educational specifications; planning committees; user input; quality of purchases; visual supervision considerations; location; workstation design; turnkey systems; electrical requirements; local area networks;…
ERIC Educational Resources Information Center
Demchik, Michael J.
2000-01-01
Describes a curriculum plan in which students learn about acid rain through instructional media, research and class presentations, lab activities, simulations, design, and design implementation. Describes the simulation activity in detail and includes materials, procedures, instructions, examples, results, and discussion sections. (SAH)
Science Facilities Design Guidelines.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…
Education Design Showcase: Annual Awards 2003.
ERIC Educational Resources Information Center
School Planning & Management, 2003
2003-01-01
This fourth annual special supplement recognizes outstanding architecture and design in K-12 schools and college facilities. Each entry contains photographs, a text description, and summarized project data. Most also include floor plans. Architect and manufacturer indexes complete the supplement. (EV)
A semi-automatic computer-aided method for surgical template design
NASA Astrophysics Data System (ADS)
Chen, Xiaojun; Xu, Lu; Yang, Yue; Egger, Jan
2016-02-01
This paper presents a generalized integrated framework of semi-automatic surgical template design. Several algorithms were implemented including the mesh segmentation, offset surface generation, collision detection, ruled surface generation, etc., and a special software named TemDesigner was developed. With a simple user interface, a customized template can be semi- automatically designed according to the preoperative plan. Firstly, mesh segmentation with signed scalar of vertex is utilized to partition the inner surface from the input surface mesh based on the indicated point loop. Then, the offset surface of the inner surface is obtained through contouring the distance field of the inner surface, and segmented to generate the outer surface. Ruled surface is employed to connect inner and outer surfaces. Finally, drilling tubes are generated according to the preoperative plan through collision detection and merging. It has been applied to the template design for various kinds of surgeries, including oral implantology, cervical pedicle screw insertion, iliosacral screw insertion and osteotomy, demonstrating the efficiency, functionality and generality of our method.
A semi-automatic computer-aided method for surgical template design
Chen, Xiaojun; Xu, Lu; Yang, Yue; Egger, Jan
2016-01-01
This paper presents a generalized integrated framework of semi-automatic surgical template design. Several algorithms were implemented including the mesh segmentation, offset surface generation, collision detection, ruled surface generation, etc., and a special software named TemDesigner was developed. With a simple user interface, a customized template can be semi- automatically designed according to the preoperative plan. Firstly, mesh segmentation with signed scalar of vertex is utilized to partition the inner surface from the input surface mesh based on the indicated point loop. Then, the offset surface of the inner surface is obtained through contouring the distance field of the inner surface, and segmented to generate the outer surface. Ruled surface is employed to connect inner and outer surfaces. Finally, drilling tubes are generated according to the preoperative plan through collision detection and merging. It has been applied to the template design for various kinds of surgeries, including oral implantology, cervical pedicle screw insertion, iliosacral screw insertion and osteotomy, demonstrating the efficiency, functionality and generality of our method. PMID:26843434
A semi-automatic computer-aided method for surgical template design.
Chen, Xiaojun; Xu, Lu; Yang, Yue; Egger, Jan
2016-02-04
This paper presents a generalized integrated framework of semi-automatic surgical template design. Several algorithms were implemented including the mesh segmentation, offset surface generation, collision detection, ruled surface generation, etc., and a special software named TemDesigner was developed. With a simple user interface, a customized template can be semi- automatically designed according to the preoperative plan. Firstly, mesh segmentation with signed scalar of vertex is utilized to partition the inner surface from the input surface mesh based on the indicated point loop. Then, the offset surface of the inner surface is obtained through contouring the distance field of the inner surface, and segmented to generate the outer surface. Ruled surface is employed to connect inner and outer surfaces. Finally, drilling tubes are generated according to the preoperative plan through collision detection and merging. It has been applied to the template design for various kinds of surgeries, including oral implantology, cervical pedicle screw insertion, iliosacral screw insertion and osteotomy, demonstrating the efficiency, functionality and generality of our method.
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress
2008-04-23
by Reuters, “but we are incorporating the lessons from this experience into our operational plans going forward for new ships in the design, planning ...Navy’s planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious...officials state, reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding
Variable speed gas engine-driven air compressor system
NASA Astrophysics Data System (ADS)
Morgan, J. R.; Ruggles, A. E.; Chen, T. N.; Gehret, J.
1992-11-01
Tecogen Inc. and Ingersoll-Rand Co. as a subcontractor have designed a nominal 150-hp gas engine-driven air compressor utilizing the TECODRIVE 8000 engine and the Ingersoll-Rand 178.5-mm twin screw compressor. Phase 1 included the system engineering and design, economic and applications studies, and a draft commercialization plan. Phase 2 included controls development, laboratory prototype construction, and performance testing. The testing conducted verified that the compressor meets all design specifications.
Space station System Engineering and Integration (SE and I). Volume 2: Study results
NASA Technical Reports Server (NTRS)
1987-01-01
A summary of significant study results that are products of the Phase B conceptual design task are contained. Major elements are addressed. Study results applicable to each major element or area of design are summarized and included where appropriate. Areas addressed include: system engineering and integration; customer accommodations; test and program verification; product assurance; conceptual design; operations and planning; technical and management information system (TMIS); and advanced development.
Towards Knowledge Management for Smart Manufacturing.
Feng, Shaw C; Bernstein, William Z; Hedberg, Thomas; Feeney, Allison Barnard
2017-09-01
The need for capturing knowledge in the digital form in design, process planning, production, and inspection has increasingly become an issue in manufacturing industries as the variety and complexity of product lifecycle applications increase. Both knowledge and data need to be well managed for quality assurance, lifecycle-impact assessment, and design improvement. Some technical barriers exist today that inhibit industry from fully utilizing design, planning, processing, and inspection knowledge. The primary barrier is a lack of a well-accepted mechanism that enables users to integrate data and knowledge. This paper prescribes knowledge management to address a lack of mechanisms for integrating, sharing, and updating domain-specific knowledge in smart manufacturing. Aspects of the knowledge constructs include conceptual design, detailed design, process planning, material property, production, and inspection. The main contribution of this paper is to provide a methodology on what knowledge manufacturing organizations access, update, and archive in the context of smart manufacturing. The case study in this paper provides some example knowledge objects to enable smart manufacturing.
Simon, Richard
2008-06-01
Developments in genomics and biotechnology provide unprecedented opportunities for the development of effective therapeutics and companion diagnostics for matching the right drug to the right patient. Effective co-development involves many new challenges with increased opportunity for success as well as delay and failure. Clinical trial designs and adaptive analysis plans for the prospective design of pivotal trials of new therapeutics and companion diagnostics are reviewed. Effective co-development requires careful prospective planning of the design and analysis strategy for pivotal clinical trials. Randomized clinical trials continue to be important for evaluating the effectiveness of new treatments, but the target populations for analysis should be prospectively specified based on the companion diagnostic. Post hoc analyses of traditionally designed randomized clinical trials are often deeply problematic. Clear separation is generally required of the data used for developing the diagnostic test, including their threshold of positivity, from the data used for evaluating treatment effectiveness in subsets determined by the test. Adaptive analysis can be used to provide flexibility to the analysis but the use of such methods requires careful planning and prospective definition in order to assure that the pivotal trial adequately limits the chance of erroneous conclusions.
ERIC Educational Resources Information Center
Smith, Polly; King, Richard
This packet contains four sets of lesson plans designed for the workplace curriculum for housekeeping employees at the Sheraton Anchorage Hotel (Anchorage, Alaska), as part of the Anchorage Workplace Literacy Program. The lesson plans, which are correlated with Laubach literacy method skills books levels 1-3, include conversation (dialogue,…
Mod-2 wind turbine system cluster research test program. Volume 1: Initial plan E-1290
NASA Technical Reports Server (NTRS)
Gordon, L. H.
1982-01-01
Upon completion of the design and development of three Mod-2 wind turbines, a series of research experiments are planned to gather data on and evaluate the performance, environmental effects, and operation of a cluster as well as a single, large multimegawatt wind turbine. Information on the program objectives, a Mod-2 system description, a planned schedule, organizational roles, and responsibilities, is included.
Designing and Implementing a Jointly-Planned Unit: Expanding Thematic Units beyond the Textbook.
ERIC Educational Resources Information Center
Anderson, Laurel M.
A first-grade teacher included her students in her planning of a unit of study. The teacher explained to the students how she planned a unit and invited the students to volunteer ideas for the topic. The topic chosen was space and aliens. The teacher and students discussed what they already knew about the topic, what they wanted to learn about it,…
Hill, Z; Manu, A; Tawiah-Agyemang, C; Gyan, T; Turner, K; Weobong, B; Ten Asbroek, A H A; Kirkwood, B R
2008-12-01
Formative research is often used to inform intervention design, but the design process is rarely reported. This study describes how an integrated home visit intervention for newborns in Ghana was designed. As a first step in the design process, the known intervention parameters were listed, information required to refine the intervention was then identified and a formative research strategy designed. The strategy included synthesizing available data, collecting data on newborn care practices in homes and facilities, on barriers and facilitators to adopting desired behaviors and on practical issues such as whom to include in the intervention. The data were used to develop an intervention plan through workshops with national and international stakeholders and experts. The intervention plan was operationalized by district level committees. This included developing work plans, a creative brief for the materials and completing a community volunteer inventory. The intervention was then piloted and the intervention materials were finalized. The design process took over a year and was iterative. Throughout the process, literature was reviewed to identify the best practice. The intervention focuses on birth preparedness, using treated bednets in pregnancy, early and exclusive breastfeeding, thermal care, special care for small babies and prompt care seeking for newborns with danger signs. The need for a problem-solving approach was identified to help ensure behavior change. A subset of behaviors were already being performed adequately, or were the focus of other interventions, but were important to reinforce in the visits. These include attending antenatal care and care seeking for danger signs in pregnancy. On the basis of the intervention content, the timing of newborn deaths and the acceptability of visits, two antenatal and three visits in the first week of life (days 1, 3 and 7) were planned. Several household members were identified to include in the visits as they were involved in newborn care or they made financial decisions. Birth attendants and health workers were often the locus of control for immediate newborn care, and sensitization activities were designed to improve their practices and to help ensure that families received consistent messages. An existing cadre of community volunteers was identified to deliver the intervention-these volunteers were already trusted and accepted by the community, already visited pregnant women at home and had the time and commitment to deliver the intervention. A supervision and remuneration system was developed through discussions with the volunteers and at the planning workshops. The need for community entry activities was identified to garner community support for the intervention, to encourage self-identification of pregnant and delivered women and to motivate the volunteer through community recognition. Formative research is an essential step in helping to ensure the development of an effective, appropriate and sustainable intervention.
What is the Final Verification of Engineering Requirements?
NASA Technical Reports Server (NTRS)
Poole, Eric
2010-01-01
This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Vegetation and other development options for mitigating urban air pollution impacts
In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...
29 CFR 1910.1030 - Bloodborne pathogens.
Code of Federal Regulations, 2013 CFR
2013-07-01
... including highly resistant bacterial endospores. Universal Precautions is an approach to infection control... paragraph (b) of this section shall establish a written Exposure Control Plan designed to eliminate or... available and effective safer medical devices designed to eliminate or minimize occupational exposure. (v...
Code of Federal Regulations, 2010 CFR
2010-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2014 CFR
2014-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2012 CFR
2012-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2011 CFR
2011-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Code of Federal Regulations, 2013 CFR
2013-04-01
... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...
Impacts of Climate Variability and Change on Flood Frequency Analysis for Transportation Design
DOT National Transportation Integrated Search
2010-09-01
Planning for construction of roads and bridges over rivers or floodplains includes a hydrologic analysis of rainfall amount and intensity : for a defined period. Infrastructure design must be based on accurate rainfall estimates how much (intensi...
Designing the Electronic Classroom.
ERIC Educational Resources Information Center
Adams, Laural L.
In an increasingly technological environment, traditional teaching presentation methods such as the podium, overhead, and transparencies are no longer sufficient. This document serves as a guide to designing and planning an electronic classroom for "bidirectional" communication between teacher and student. Topics include: (1) determining…
Integrating payload design, planning, and control in the Dutch Utilisation Centre
NASA Technical Reports Server (NTRS)
Grant, T. J.
1993-01-01
Spacecraft payload design, experiment planning and scheduling, and payload control are traditionally separate areas of activity. This paper describes the development of a prototype software tool--the Activity Scheduling System (ASS)--which integrates these activity areas. ASS is part of a larger project to build a Dutch Utilisation Centre (DUC), intended eventually to support all space utilization activities in The Netherlands. ASS has been tested on the High Performance Capillary Electrophoresis payload. The paper outlines the integrated preparation and operations concept embodied in ASS. It describes the ASS prototype, including a typical session. The results of testing are summarized. Possible enhancement of ASS, including integration into DUC, is sketched.
40 CFR 130.9 - Designation and de-designation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... QUALITY PLANNING AND MANAGEMENT § 130.9 Designation and de-designation. (a) Designation. Areawide planning... specified in Water Quality Management (WQM) plans. Areawide planning agencies shall monitor DMA activities... continue water quality planning activities within the designated boundaries. (c) Impact of de-designation...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wu, Q
Purpose: To replace the paper records, we designed an electronic records function for plan checked meeting in our in-house developed radiotherapy information management system(RTIMS). Methods: Since 2007, the RTIMS has been developed on a database and web service of Apache+PHP+MySQL, and almost all computers and smartphones could access the RTIMS through IE browser, to input, search, count, and print the data. In 2012, we also established an radiation therapy case conference multi-media system(RTCCMMS) based on Windows Remote Desktop feature. Since 2013, we have carried out the treatment plan checked meeting of the physics division in every afternoon for about halfmore » an hour. In 2014, we designed an electronic records function, which includes a meeting information record and a checked plan record. And the meeting record includes the following items: meeting date, name, place, length, status, attendee, content, etc. The plan record includes the followings: meeting date, meeting name, patient ID, gender, age, patient name, course, plan, purpose, position, technique, CTsim type, plan type, primary doctor, other doctor, primary physicist, other physicist, difficulty, quality, score, opinion, status, note, etc. Results: In the past year, the electronic meeting records function has been successfully developed and implemented in the division, and it could be accessed from an smartphone. Almost all items have the corresponding pull-down menu selection, and each option would try to intelligently inherit default value from the former record or other form. According to the items, we could do big data mining to the input data. It also has both Chinese and English two versions. Conclusion: It was demonstrated to be user-friendly and was proven to significantly improve the clinical efficiency and quality of treatment plan. Since the RTIMS is an in-house developed system, more functions can be added or modified to further enhance its potentials in research and clinical practice. Project supported by the National Natural Science Foundation of China (Grant No.81101694)« less
Design study of the deepsky ultraviolet survey telescope. [Spacelab payload
NASA Technical Reports Server (NTRS)
Page, N. A.; Callaghan, F. G.; Killen, R. H.; Willis, W.
1977-01-01
Preliminary mechanical design and specifications are presented for a wide field ultraviolet telescope and detector to be carried as a Spacelab payload. Topics discussed include support structure stiffness (torsional and bending), mirror assembly, thermal control, optical alignment, attachment to the instrument pointing pallet, control and display, power requirements, acceptance and qualification test plans, cost analysis and scheduling. Drawings are included.
Planning and design considerations in karst terrain
NASA Astrophysics Data System (ADS)
Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.
1988-10-01
This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.
DOT National Transportation Integrated Search
2009-11-01
Highway agencies across the nation are moving towards implementation of the new AASHTO Mechanistic-Empirical Pavement Design Guide (MEPDG) for pavement design. The benefits of implementing the MEPDG for routine use in Ohio includes (1) achieving more...
ERIC Educational Resources Information Center
Björklund, Tua A.; Nordström, Katrina M.; Clavert, Maria
2013-01-01
The paper presents a Sino-Finnish teaching initiative, including the design and experiences of a series of pedagogical workshops implemented at the Aalto-Tongji Design Factory (DF), Shanghai, China, and the experimentation plans collected from the 54 attending professors and teachers. The workshops aimed to encourage trying out interdisciplinary…
NASA Technical Reports Server (NTRS)
Wojciechowski, C. J.; Kurzius, S. C.; Doktor, M. F.
1984-01-01
The design of a subscale jet engine driven ejector/diffuser system is examined. Analytical results and preliminary design drawings and plans are included. Previously developed performance prediction techniques are verified. A safety analysis is performed to determine the mechanism for detonation suppression.
Recommendations for Child Care Centers. Revised Edition.
ERIC Educational Resources Information Center
Moore, Gary T.; Lane, Carol G.; Hill, Ann B.; Cohen, Uriel; McGinty, Tim
Part of a seven-volume series on children's environments, this monograph is a design guide for policy, planning, programming, design, and evaluation of early childhood facilities. The design guide includes 115 patterns for large, medium, and small child care centers in neighborhood and work-place settings. Many of the patterns are appropriate also…
From Barrier Free to Safe Environments: The New Zealand Experience. Monograph #44.
ERIC Educational Resources Information Center
Wrightson, William; Pope, Campbell
Intrinsically safe design is presented as a logical extension of the principles of barrier free design, and as a higher level design strategy for effecting widespread implementation of the basic accessibility requirements for people with disabilities. Two fundamental planning procedures are proposed: including principles of safe and accessible…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albis, A.H.A.
This research effort is concerned with the identification and utilization of practical design guidelines to meet the demand for guidance in innovative planning and building design for Egyptian desert conditions. An energy-conscious design can be realized with a minimum expenditure of exhaustible energy resources and maximum utilization of the natural energies for cooling and heating. The energy design guidelines developed will be applied to an Urban Center, on a site selected to alleviate the stress on Cairo, which has been suffering for over two decades from housing shortages due to overpopulation. Design criteria to meet the challenges of this researchmore » include: neighborhood planning; orientation; building details; shading; colors of walls and roofs; materials; and massing configuration. In this research, desert construction and its aspects, use of building materials, approaches to energy conservation, and architectural principles for neighborhood planning are identified. The human requirement for thermal comfort specific to desert environments are analyzed and related to diurnal and annual patterns of outdoor conditions, and to the potential for modifying indoor thermal conditions by designs suitable to prevailing climatic conditions.« less
Are care plans suitable for the management of multiple conditions?
Young, Charlotte E.; Boyle, Frances M.; Mutch, Allyson J.
2016-01-01
Background Care plans have been part of the primary care landscape in Australia for almost two decades. With an increasing number of patients presenting with multiple chronic conditions, it is timely to consider whether care plans meet the needs of patients and clinicians. Objectives To review and benchmark existing care plan templates that include recommendations for comorbid conditions, against four key criteria: (i) patient preferences, (ii) setting priorities, (iii) identifying conflicts and synergies between conditions, and (iv) setting dates for reviewing the care plan. Design Document analysis of Australian care plan templates published from 2006 to 2014 that incorporated recommendations for managing comorbid conditions in primary care. Results Sixteen templates were reviewed. All of the care plan templates addressed patient preference, but this was not done comprehensively. Only three templates included setting priorities. None assisted in identifying conflicts and synergies between conditions. Fifteen templates included setting a date for reviewing the care plan. Conclusions Care plans are a well-used tool in primary care practice, but their current format perpetuates a single-disease approach to care, which works contrary to their intended purpose. Restructuring care plans to incorporate shared decision-making and attention to patient preferences may assist in shifting the focus back to the patient and their care needs. PMID:29090181
Design Details for the Aquantis 2.5 MW Ocean Current Generation Device
Banko, Rich; Coakley, David; Colegrove, Dana; Fleming, Alex; Zierke, William; Ebner, Stephen
2015-06-03
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simulation report. This dataset also contains analysis trade off studies of fixed vs. variable pitch and 2 vs. 3 blades.
Advanced space program studies. Overall executive summary
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1977-01-01
NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.
New Jersey's Design for Educational Excellence: Into Action.
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
This booklet describes various new initiatives that the state of New Jersey has launched in the past 18 months, including: (1) proposed revisions of principal certification requirements; (2) a plan for state intervention in deficient school districts; (3) a plan for the supervision of instruction; (4) an adult literacy program; and (5) a plan…
Long-Term Care Planning Study: Strengths and Learning Needs of Nursing Staff
ERIC Educational Resources Information Center
Cruttenden, Kathleen E.
2006-01-01
This planning study was designed and conducted in a predominantly rural Canadian province to examine the strengths and learning needs of four categories of nursing staff practising in New Brunswick nursing homes. Participants included directors of care, registered nurses, licensed practical nurses, and resident attendants. The nursing homes ranged…
40 CFR 63.1210 - What are the notification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... change in information already provided under § 63.9. 63.1206(b)(5)(i) Notification of changes in design...), 63.9(e) 63.9(g)(1) and (3) Notification of performance test and continuous monitoring system evaluation, including the performance test plan and CMS performance evaluation plan.1 63.1210(b) Notification...
40 CFR 63.1210 - What are the notification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... change in information already provided under § 63.9. 63.1206(b)(5)(i) Notification of changes in design...), 63.9(e) 63.9(g)(1) and (3) Notification of performance test and continuous monitoring system evaluation, including the performance test plan and CMS performance evaluation plan.1 63.1210(b) Notification...
CHOICE (Considering Honest Options in Career Exploration).
ERIC Educational Resources Information Center
Langford, Carolyn
The Considering Honest Options in Career Exploration (CHOICE) program is a career decision-making plan designed to assist counselors and teachers in helping high school juniors and seniors develop specific written career plans that they can implement after high school. This guide includes an overview of CHOICE and three CHOICE learning modules.…
Strategic survey framework for the Northwest Forest Plan survey and manage program.
Randy Molina; Dan McKenzie; Robin Lesher; Jan Ford; Jim Alegria; Richard Cutler
2003-01-01
This document outlines an iterative process for assessing the information needs for all Northwest Forest Plan (NWFP) survey and manage species, designing and implementing strategic surveys (including field surveys and other information-gathering processes), and analyzing that information for use in the NWFP annual species review and adaptive-management processes. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
..., management, maintenance, and monitoring of conservation lands used to mitigate the effects of the other.... The LOHCP is a comprehensive plan designed to provide long-term conservation and management of... Maintenance: Public and private utility company activities to operate and maintain, including repair and...
Planning for Education: Space Guidelines for Planning Educational Facilities. Revised.
ERIC Educational Resources Information Center
Oklahoma State Dept. of Education, Oklahoma City.
This booklet provides guidelines for school planners and designers on the state requirements for space allocation in its K-12 public schools. Recommendations are included for various specialized facilities to assure that proper spaces can be provided beyond the typical classroom space. Guidelines are arranged under the categories of instructional,…
The Teacher's Checklist. A "Flight Plan" for Effective Teaching and Classroom Management.
ERIC Educational Resources Information Center
Missouri State Dept. of Elementary and Secondary Education, Jefferson City.
Designed primarily for beginning teachers in Missouri public schools, this pamphlet provides a checklist of practical, common sense pointers for classroom teaching. Material is provided on seven topics, including planning before opening day, opening day, the first weeks, yearlong objectives, assistance from the principal and administrators, 10…
FloorPlan. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Rosenfeld, Vila M.; And Others
This courseware evaluation rates the "FloorPlan" program developed by the Learning Seed. (The program--not included in this document--allows room design and arrangement to be performed on the computer screen.) The courseware was rated by a team of home economists participating in a network for the dissemination of courseware reviews.…
ERIC Educational Resources Information Center
National Education Association, Washington, DC. Project on Utilization of Inservice Education R & D Outcomes.
The workshop instructional materials described here are designed to try out a systematic problem solving process as a way of working toward improvements in the school setting. Topics include diagnosis using force field technique, small group dynamics, planning for action, and planning a RUPS (Research Using Problem Solving) project. This…
Make Waves: Read! 1998 Summer Library Program Manual. Bulletin No. 98107.
ERIC Educational Resources Information Center
Roeber, Jane A., Ed.
This manual is designed to help individual libraries in Wisconsin plan and implement their summer library programs. The manual is divided into six sections. Section 1 covers planning and promoting programs, and includes reproducible promotional materials, sample letters to parents, and sample media materials. Section 2 provides decorating and…
24 CFR 598.205 - What are the requirements for nomination?
Code of Federal Regulations, 2011 CFR
2011-04-01
... that the strategic plan described in § 598.215 will be implemented, and these governments submit its... strategic plan, as described in § 598.215; (3) Include the certifications described in § 598.210; (4... designation process. (Approved by the Office of Management and Budget under Control Number 2506-0148) [63 FR...
The K-8 Aeronautics Internet Testbook: Project Plan-Year 3
NASA Technical Reports Server (NTRS)
Pallis, Jani Macari
1997-01-01
The Project Plan - Year 3 includes: the major tasks and milestones, the assignment of tasks, and the key personnel assigned to each task, a description of the milestone and major task, and the deliverables for the project. Milestones have project numbers ending in "0.0", such as "25.0.0 Phase III Development". Major tasks under that milestone begin with the same first number such as, "25.0.1 Develop Future Of Aeronautics". The assignment of tasks included in the Year 3 project plan contains the names of the key personnel responsible for the task and others participating on the task. Although the PI has the overall and ultimately responsible for all the tasks and milestones, the name of the first individual on a task or milestone is the person responsible for that task. Other names listed under that task will be participating on the task. Since there are two individuals at Cislunar Aerospace, Inc. with the name "J. Pallis", the principal investigator, Jani Macari Pallis is designated as PI in the Project Plan and James Pallis is designated as J. Pallis.
GUIDANCE FOR LANDFILLING WASTE IN ECONOMICALLY DEVELOPING COUNTRIES
The report offers guidance on all aspects of the planning, design, and implementation of landfills in economically developing countries. The intended audience includes municipal officials, solid waste managers, engineers, and planners. The report's 18 chapters include critical ...
Decentralizing the Team Station: Simulation before Reality as a Best-Practice Approach.
Charko, Jackie; Geertsen, Alice; O'Brien, Patrick; Rouse, Wendy; Shahid, Ammarah; Hardenne, Denise
2016-01-01
The purpose of this article is to share the logistical planning requirements and simulation experience of one Canadian hospital as it prepared its staff for the change from a centralized inpatient unit model to the decentralized design planned for its new community hospital. With the commitment and support of senior leadership, project management resources and clinical leads worked collaboratively to design a decentralized prototype in the form of a pod-style environment in the hospital's current setting. Critical success factors included engaging the right stakeholders, providing an opportunity to test new workflows and technology, creating a strong communication plan and building on lessons learned as subsequent pod prototypes are launched.
West Virginia Geological Survey's role in siting fluidized bed combustion facilities
Smith, C.J.; King, Hobart M.; Ashton, K.C.; Kirstein, D.S.; McColloch, G.H.
1989-01-01
A project is presented which demonstrates the role of geology in planning and siting a fluidized bed combustion facility. Whenever a project includes natural resource utilization, cooperation between geologists and design engineers will provide an input that could and should save costs, similar to the one stated in our initial premise. Regardless of whether cost reductions stem from a better knowledge of fuel and sorbent availabilities, or a better understanding of the local hydrology, susceptibility to mine-subsidence, or other geologic hazards, the geological survey has a vital role in planning. Input to planning could help the fluidized-bed developer and design-engineer solve some economic questions and stretch the financial resources at their disposal.
How to improve medical education website design.
Sisson, Stephen D; Hill-Briggs, Felicia; Levine, David
2010-04-21
The Internet provides a means of disseminating medical education curricula, allowing institutions to share educational resources. Much of what is published online is poorly planned, does not meet learners' needs, or is out of date. Applying principles of curriculum development, adult learning theory and educational website design may result in improved online educational resources. Key steps in developing and implementing an education website include: 1) Follow established principles of curriculum development; 2) Perform a needs assessment and repeat the needs assessment regularly after curriculum implementation; 3) Include in the needs assessment targeted learners, educators, institutions, and society; 4) Use principles of adult learning and behavioral theory when developing content and website function; 5) Design the website and curriculum to demonstrate educational effectiveness at an individual and programmatic level; 6) Include a mechanism for sustaining website operations and updating content over a long period of time. Interactive, online education programs are effective for medical training, but require planning, implementation, and maintenance that follow established principles of curriculum development, adult learning, and behavioral theory.
Prioritizing Arctic Observations with Limited Resources
NASA Astrophysics Data System (ADS)
Kelly, B.; Starkweather, S.
2012-12-01
U.S. Federal agencies recently completed a five-year research plan for the Arctic including plans to enhance efforts toward an Arctic Observing Network (AON). Following on numerous national and international planning efforts, the five-year plan identifies nine priority areas including enhancing observing system design, assessing priorities of local residents, and improving data access. AON progress to date has been realized through bottom-up funding decisions and some top-down design optimization approaches, which have resulted in valuable yet ad hoc progress towards Arctic research imperatives. We suggest that advancing AON beyond theoretical design and ad hoc efforts with the engagement of multiple U.S. Federal agencies will require a structured, input-based planning approach to prioritization that recognizes budget realities. Completing a long list of worthy observing efforts appears to be unsustainable and inadequate in responding to the rapid changes taking place in the Arctic. Society would be better served by more rapid implementation of sustained, long-term observations focused on those climate feedbacks with the greatest potential negative impacts. Several emerging theoretical frameworks have pointed to the need to enhance iterative, capacity-building dialog between observationalists, modelers, and stakeholders as a way to identify these broadest potential benefits. We concur and suggest that those dialogs need to be facilitated and sustained over long periods. Efforts to isolate observational programs from process research are, we believe, impeding progress. At the same time, we note that bottom-up funding decisions, while useful for prioritizing process research, are less appropriate to building observing systems.
Leisure Today. Leisure Programming: The State of the Art.
ERIC Educational Resources Information Center
Busser, James A.; And Others
1993-01-01
Nine articles examine current topics in leisure programing, including program design and evaluation, program design through imagery, keys to quality leisure programing, programing with style, total quality program planning, evaluation of leisure programs, programing for older adults, and the intergenerational entrepreneurship demonstration…
High School Science Technology Additions, Midland Public Schools.
ERIC Educational Resources Information Center
Design Cost Data, 2001
2001-01-01
Discusses design goals, space requirements, and need for mobile furniture and "imagination stations" at Michigan's Midland Public High School science technology addition. Describes the architectural design, costs, and specifications. Includes floor plans, general description, photos and a list of consultants, manufacturers, and suppliers…
Design study of arresting gear system for recovery of space shuttle orbiters
NASA Technical Reports Server (NTRS)
1972-01-01
A plan is reported for the design, manufacture, development, test, and production of an emergency arrestment system for the recovery of shuttle orbiters. Time and cost estimates are included. System testing and several optional test programs are discussed.
MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints
2001-08-01
progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New
NASA Technical Reports Server (NTRS)
1979-01-01
A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hays, Steve; Piekarz, Henryk; Pfeffer, Howie
2007-06-01
Recently proposed fast cycling accelerators for proton drivers (SF-SPS, CERN and SF-MR, SF-BOOSTER, FNAL) neutrino sources require development of new magnet technology. In support of this magnet development a power supply system will need to be developed that can support the high current and high rate of power swing required by the fast cycling (1 sec rise and fall in the SF-MR, 5Hz in Booster). This paper will outline a design concept for a +/- 2000 V and 100,000 A fast ramping power supply system. This power supply design is in support of a 6.44 km magnet system at 0.020more » H and 330 m 5 Hz, 0.00534 H superconducting loads. The design description will include the layout and plan for extending the present FNAL Main Injector style ramping power supply to the higher currents needed for this operation. This will also include the design for a harmonic filter and power factor corrector that will be needed to control the large power swings caused by the fast cycle time. A conceptual design for the current regulation system and control will also be outlined. The power circuit design will include the bridge, filter and transformer plan based on existing designs.« less
Geothermal energy systems plan for Boise City
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-01-01
This is a plan for development of a downtown Boise geothermal district space heating system incorporating legal, engineering, organizational, geological, and economic requirements. Topics covered include: resource characteristics, system design and feasibility, economic feasibility, legal overview, organizational alternatives, and conservation. Included in appendices are: property ownership patterns on the Boise Front, existing hot well data, legal briefs, environmental data, decision point communications, typical building heating system retrofit schematics, and background assumptions and data for cost summary. (MHR)
NASA Technical Reports Server (NTRS)
Manford, J. S.; Bennett, G. R.
1985-01-01
The Space Station Program will incorporate analysis of operations constraints and considerations in the early design phases to avoid the need for later modifications to the Space Station for operations. The application of modern tools and administrative techniques to minimize the cost of performing effective orbital operations planning and design analysis in the preliminary design phase of the Space Station Program is discussed. Tools and techniques discussed include: approach for rigorous analysis of operations functions, use of the resources of a large computer network, and providing for efficient research and access to information.
Orbital design strategy for domestic communication satellite systems.
NASA Technical Reports Server (NTRS)
Ramji, S.; Sawitz, P.
1973-01-01
Review of some of the considerations pertinent to efficient orbit utilization in the design of domestic communications satellite systems. A strategy is developed to efficiently locate a heterogeneous system of satellites within the available arc and provide room for future growth. A practical design is illustrated, using a computer simulation model, for the placement of 25 satellites within 73% of the available arc employing frequency and polarization coordination techniques. A number of widely variable factors that influence satellite spacing are examined. These factors include such critical system elements as telephony and television interference noise limits, frequency plan coordination, polarization plan coordination, ground antenna diameter, signal protection ratio, and satellite station keeping.
Preliminary plan for a Shuttle Coherent Atmospheric Lidar Experiment (SCALE)
NASA Technical Reports Server (NTRS)
Fitzjarrald, D.; Beranek, R.; Bilbro, J.; Mabry, J.
1985-01-01
A study has been completed to define a Shuttle experiment that solves the most crucial scientific and engineering problems involved in building a satellite Doppler wind profiler for making global wind measurements. The study includes: (1) a laser study to determine the feasibility of using the existing NOAA Windvan laser in the Space Shuttle spacecraft; (2) a preliminary optics and telescope design; (3) an accommodations study including power, weight, thermal, and control system requirements; and (4) a flight trajectory and operations plan designed to accomplish the required scientific and engineering goals. The experiment will provide much-needed data on the global distribution of atmospheric aerosols and demonstrate the technique of making wind measurements from space, including scanning the laser beam and interpreting the data. Engineering accomplishments will include space qualification of the laser, development of signal processing and lag angle compensation hardware and software, and telescope and optics design. All of the results of this limited Spacelab experiment will be directly applicable to a complete satellite wind profiler for the Earth Observation System/Space Station or other free-flying satellite.
NASA Astrophysics Data System (ADS)
Ferguson, I. M.; McGuire, M.; Broman, D.; Gangopadhyay, S.
2017-12-01
The Bureau of Reclamation is a Federal agency tasked with developing and managing water supply and hydropower projects in the Western U.S. Climate and hydrologic variability and change significantly impact management actions and outcomes across Reclamation's programs and initiatives, including water resource planning and operations, infrastructure design and maintenance, hydropower generation, and ecosystem restoration, among others. Planning, design, and implementation of these programs therefore requires consideration of future climate and hydrologic conditions will impact program objectives. Over the past decade, Reclamation and other Federal agencies have adopted new guidelines, directives, and mandates that require consideration of climate change in water resources planning and decision making. Meanwhile, the scientific community has developed a large number of climate projections, along with an array of models, methods, and tools to facilitate consideration of climate projections in planning and decision making. However, water resources engineers, planners, and decision makers continue to face challenges regarding how best to use the available data and tools to support major decisions, including decisions regarding infrastructure investments and long-term operating criteria. This presentation will discuss recent and ongoing research towards understanding, improving, and expanding consideration of climate projections and related uncertainties in Federal water resources planning and decision making. These research efforts address a variety of challenges, including: How to choose between available climate projection datasets and related methods, models, and tools—many of which are considered experimental or research tools? How to select an appropriate decision framework when design or operating alternatives may differ between climate scenarios? How to effectively communicate results of a climate impacts analysis to decision makers? And, how to improve robustness and resilience of water resources systems in the face of significant uncertainty? Discussion will focus on the intersection between technical challenges and decision making paradigms and the need for improved scientist-decision maker engagement through the lens of this Federal water management agency.
Guidelines for Initiating a Research Agenda: Research Design and Dissemination of Results.
Delost, Maria E; Nadder, Teresa S
2014-01-01
Successful research outcomes require selection and implementation of the appropriate research design. A realistic sampling plan appropriate for the design is essential. Qualitative or quantitative methodology may be utilized, depending on the research question and goals. Quantitative research may be experimental where there is an intervention, or nonexperimental, if no intervention is included in the design. Causation can only be established with experimental research. Popular types of nonexperimental research include descriptive and survey research. Research findings may be disseminated via presentations, posters, and publications, such as abstracts and manuscripts.
Design and analysis of advanced flight planning concepts
NASA Technical Reports Server (NTRS)
Sorensen, John A.
1987-01-01
The objectives of this continuing effort are to develop and evaluate new algorithms and advanced concepts for flight management and flight planning. This includes the minimization of fuel or direct operating costs, the integration of the airborne flight management and ground-based flight planning processes, and the enhancement of future traffic management systems design. Flight management (FMS) concepts are for on-board profile computation and steering of transport aircraft in the vertical plane between a city pair and along a given horizontal path. Flight planning (FPS) concepts are for the pre-flight ground based computation of the three-dimensional reference trajectory that connects the city pair and specifies the horizontal path, fuel load, and weather profiles for initializing the FMS. As part of these objectives, a new computer program called EFPLAN has been developed and utilized to study advanced flight planning concepts. EFPLAN represents an experimental version of an FPS. It has been developed to generate reference flight plans compatible as input to an FMS and to provide various options for flight planning research. This report describes EFPLAN and the associated research conducted in its development.
Planning for a data base system to support satellite conceptual design
NASA Technical Reports Server (NTRS)
Claydon, C. R.
1976-01-01
The conceptual design of an automated satellite design data base system is presented. The satellite catalog in the system includes data for all earth orbital satellites funded to the hardware stage for launch between 1970 and 1980, and provides a concise compilation of satellite capabilities and design parameters. The cost of satellite subsystems and components will be added to the base. Data elements are listed and discussed. Sensor and science and applications opportunities catalogs will be included in the data system. Capabilities of the BASIS storage, retrieval, and analysis system are used in the system design.
Spacecraft computer technology at Southwest Research Institute
NASA Technical Reports Server (NTRS)
Shirley, D. J.
1993-01-01
Southwest Research Institute (SwRI) has developed and delivered spacecraft computers for a number of different near-Earth-orbit spacecraft including shuttle experiments and SDIO free-flyer experiments. We describe the evolution of the basic SwRI spacecraft computer design from those weighing in at 20 to 25 lb and using 20 to 30 W to newer models weighing less than 5 lb and using only about 5 W, yet delivering twice the processing throughput. Because of their reduced size, weight, and power, these newer designs are especially applicable to planetary instrument requirements. The basis of our design evolution has been the availability of more powerful processor chip sets and the development of higher density packaging technology, coupled with more aggressive design strategies in incorporating high-density FPGA technology and use of high-density memory chips. In addition to reductions in size, weight, and power, the newer designs also address the necessity of survival in the harsh radiation environment of space. Spurred by participation in such programs as MSTI, LACE, RME, Delta 181, Delta Star, and RADARSAT, our designs have evolved in response to program demands to be small, low-powered units, radiation tolerant enough to be suitable for both Earth-orbit microsats and for planetary instruments. Present designs already include MIL-STD-1750 and Multi-Chip Module (MCM) technology with near-term plans to include RISC processors and higher-density MCM's. Long term plans include development of whole-core processors on one or two MCM's.
Study on workshop layout of a motorcycle company based on systematic layout planning (SLP)
NASA Astrophysics Data System (ADS)
Zhou, Kang-Qu; Zhang, Rui-Juan; Wang, Ying-Dong; Wang, Bing-Jie
2010-08-01
The method of SLP has been applied in a motorcycle company's layout planning. In this layout design, the related graphics have been used to illuminate the logistics and non-logistics relationships of every workshop to get the integrated relationships of workshops and preliminary plans. Comparing the two preliminary plans including logistics efficiency, space utilization, management conveniences, etc, an improvement solution is proposed. Through the improvement solution, the productivity has been increased by 18% and the production capacity is able to make 1600 engines each day.
NASA Technical Reports Server (NTRS)
Chien, Steve; Rabideau, Gregg; Tran, Daniel; Knight, Russell; Chouinard, Caroline; Estlin, Tara; Gaines, Daniel; Clement, Bradley; Barrett, Anthony
2007-01-01
CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.
State and local retirement plans: innovation and renovation.
Rajnes, D
2001-07-01
This Special Report/Issue Brief examines the universe of state and local retirement plans. It describes how these plans have developed and continue to evolve in a number of areas, including plan features, regulatory framework, governance, and asset management. While these retirement programs differ in many respects from private-sector plans, the disparity in some areas has narrowed. This report also includes a discussion of trends and the underlying forces for change. Public-sector retirement programs provide an important source of pension coverage in the United States, and are a significant part of the total retirement market: Combined public-sector retirement assets (state, local, and federal governments) comprised 29 percent of the $11.2 trillion U.S. retirement market in 1998. State and local plans are dominant in the public-sector retirement market, holding $2.7 trillion in assets, compared with $696 billion held by federal plans (both military and civilian). More than 16 million individuals are employed by state and local jurisdictions in the United States. State and local retirement plans share certain common features because of the environment in which they operate. Legal statutes, governance, and tradition all play a role in defining what is sometimes referred to as a "public-sector culture." Despite common features, there is considerable diversity among public-sector retirement plans. To attract and retain a skilled work force, public-sector employers have increased their use of defined contribution (DC) plans to supplement defined benefit (DB) plans (or, to a lesser extent, replace or serve as an alternative to them) and improve cost-of-living adjustments. At the same time, a combined federal-state regulatory framework has encouraged certain plan design features, unavailable in the private sector, which include multiple tiers for successive generations of employees in a single plan and different strategies to increase portability. State and local retirement plans reflect an increasing role by the federal government in pension system design and operation, which has led to greater complexity in such areas as Social Security participation and deferred compensation arrangements. Complexity can be expected to increase with the recent passage of P.L. 107-16, the Economic Growth and Tax Relief Reconciliation Act of 2001. The latest full-year data included in this report are for 1999 and in some cases 2000. After this report went to press, the Federal Reserve issued significantly revised quarterly data for state, local, and federal retirement plan assets, which were not incorporated in this Issue Brief.
Guidelines for Conducting College Persistence/Education Research.
ERIC Educational Resources Information Center
Hoover, Donald R.
1991-01-01
Suggested research procedures for higher education practitioners with little research background, emphasizing college persistence and education studies, include seeking advice from qualified colleagues and statisticians, especially in the planning stages. Focal areas include scientific interest, practical significance, research design, previous…
33 CFR 273.14 - Planning procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., D.C. 20314 will be followed by further investigations. Normally, a detailed State design memorandum... information. Field surveys and office studies should be limited to minimum essentials for further detailed... include, but not be limited to, the information contained in Appendix B. (b) State design memorandum. When...
33 CFR 273.14 - Planning procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., D.C. 20314 will be followed by further investigations. Normally, a detailed State design memorandum... information. Field surveys and office studies should be limited to minimum essentials for further detailed... include, but not be limited to, the information contained in Appendix B. (b) State design memorandum. When...
33 CFR 273.14 - Planning procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., D.C. 20314 will be followed by further investigations. Normally, a detailed State design memorandum... information. Field surveys and office studies should be limited to minimum essentials for further detailed... include, but not be limited to, the information contained in Appendix B. (b) State design memorandum. When...
33 CFR 273.14 - Planning procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., D.C. 20314 will be followed by further investigations. Normally, a detailed State design memorandum... information. Field surveys and office studies should be limited to minimum essentials for further detailed... include, but not be limited to, the information contained in Appendix B. (b) State design memorandum. When...
ERIC Educational Resources Information Center
Turner, Ed; Hauser, Dan
1994-01-01
Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…
Instructional Design. [SITE 2001 Section].
ERIC Educational Resources Information Center
Boger, Stephanie, Ed.
This document contains the papers on instructional design from the SITE (Society for Information Technology & Teacher Education) 2001 conference. Topics covered include: an adaptive e-framework for teacher training; assessing the integration of technology into the curriculum; promoting instructional planning; learning and using World Wide Web page…
DOT National Transportation Integrated Search
1979-03-01
This document has been compiled to provide guidance in the planning, design, fabrication, and evaluation of human factors aspects of Automated Guideway Transit (AGT) Systems, including Downtown People Mover (DPM) systems. It is based on the present s...
25 CFR 170.460 - What must a project package include?
Code of Federal Regulations, 2010 CFR
2010-04-01
....460 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Review... environmental, archeological, and cultural clearances; and (4) Identification of design exceptions if used in...
DOT National Transportation Integrated Search
1994-11-01
">THIS REPORT IS A COMPANION TO THE 1993 MINISTRY OF TRANSPORTATION OF ONTARIO DOCUMENT, "OPERATION & DESIGN GUIDELINES FOR HOV LANES ON PROVINCIAL FREEWAYS". SINCE THAT DOCUMENT DEALS EXCLUSIVELY AND COMPREHENSIVELY WITH FREEWAY HOV APPLICATIONS, TH...
33 CFR 273.14 - Planning procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., D.C. 20314 will be followed by further investigations. Normally, a detailed State design memorandum... information. Field surveys and office studies should be limited to minimum essentials for further detailed... include, but not be limited to, the information contained in appendix B. (b) State design memorandum. When...
Overview of the Altair Lunar Lander Thermal Control System Design and the Impacts of Global Access
NASA Technical Reports Server (NTRS)
Stephan, Ryan A.
2011-01-01
NASA's Constellation Program (CxP) was developed to successfully return humans to the Lunar surface prior to 2020. The CxP included several different project offices including Altair, which was planned to be the next generation Lunar Lander. The Altair missions were architected to be quite different than the Lunar missions accomplished during the Apollo era. These differences resulted in a significantly dissimilar Thermal Control System (TCS) design. The current paper will summarize the Altair mission architecture and the various operational phases associated with the planned mission. In addition, the derived thermal requirements and the TCS designed to meet these unique and challenging thermal requirements will be presented. During the past year, the design team has focused on developing a vehicle architecture capable of accessing the entire Lunar surface. Due to the widely varying Lunar thermal environment, this global access requirement resulted in major changes to the thermal control system architecture. These changes, and the rationale behind the changes, will be detailed throughout the current paper.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Broom, Margaret; Kecskes, Zsuzsoka; Kildea, Sue; Gardner, Anne
2018-01-01
In 2012, a tertiary neonatal intensive care unit (NICU) transitioned from an open plan (OP) to a dual occupancy (DO) NICU. The DO design aimed to provide a developmental appropriate, family-centered environment for neonates and their families. During planning, staff questioned the impact DO would have on staff workflow and activity. To explore the impact of changing from an OP to a DO NICU, a prospective longitudinal study was undertaken from 2011 to 2014, using observational, time and motion, and surveys methods. Main outcome measures included distance walked by staff, minutes of staff activity, and staff perceptions of the DO design. Results highlighted no significant difference in the distances clinical nurses walked nor time spent providing direct clinical care, whereas technical support staff walked further than other staff in both designs. Staff perceived the DO design created a developmentally appropriate, family-centered environment that facilitated communication and collaboration between staff and families. Staff described the main challenges of the DO design such as effective staff communication, gaining educational opportunities, and the isolation of staff and families compared to the OP design. Our study provides new evidence that DO provides an improved developmentally environment and has similar positive benefits to single-family room for neonates and families. Such design may reduce the larger floor plan's impact on staff walking distance and work practices. Challenges of staff transition can be minimized by planning and leadership throughout the development and move to a new design.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Akimoto, Hajime; Kukita; Ohnuki, Akira
1997-07-01
The Japan Atomic Energy Research Institute (JAERI) is conducting several research programs related to thermal-hydraulic and neutronic behavior of light water reactors (LWRs). These include LWR safety research projects, which are conducted in accordance with the Nuclear Safety Commission`s research plan, and reactor engineering projects for the development of innovative reactor designs or core/fuel designs. Thermal-hydraulic and neutronic codes are used for various purposes including experimental analysis, nuclear power plant (NPP) safety analysis, and design assessment.
Safety System Design for Technology Education. A Safety Guide for Technology Education Courses K-12.
ERIC Educational Resources Information Center
North Carolina State Dept. of Public Instruction, Raleigh. Div. of Vocational Education.
This manual is designed to involve both teachers and students in planning and controlling a safety system for technology education classrooms. The safety program involves students in the design and maintenance of the system by including them in the analysis of the classroom environment, job safety analysis, safety inspection, and machine safety…
ERIC Educational Resources Information Center
Justin, J. Karl
Variables and parameters affecting architectural planning and audiovisual systems selection for lecture halls and other learning spaces are surveyed. Interrelationships of factors are discussed, including--(1) design requirements for modern educational techniques as differentiated from cinema, theater or auditorium design, (2) general hall…
A Maturity Model: Does It Provide a Path for Online Course Design?
ERIC Educational Resources Information Center
Neuhauser, Charlotte
2004-01-01
Maturity models are successfully used by organizations attempting to improve their processes, products, and delivery. As more faculty include online course design and teaching, a maturity model of online course design may serve as a tool in planning and assessing their courses for improvement based on best practices. This article presents such a…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lin, X; Sun, T; Liu, T
2014-06-01
Purpose: To evaluate the dosimetric characteristics of intensity-modulated radiotherapy (IMRT) treatment plan with beam angle optimization. Methods: Ten post-operation patients with cervical cancer were included in this analysis. Two IMRT plans using seven beams were designed in each patient. A standard coplanar equi-space beam angles were used in the first plan (plan 1), whereas the selection of beam angle was optimized by beam angle optimization algorithm in Varian Eclipse treatment planning system for the same number of beams in the second plan (plan 2). Two plans were designed for each patient with the same dose-volume constraints and prescription dose. Allmore » plans were normalized to the mean dose to PTV. The dose distribution in the target, the dose to the organs at risk and total MU were compared. Results: For conformity and homogeneity in PTV, no statistically differences were observed in the two plans. For the mean dose in bladder, plan 2 were significantly lower than plan 1(p<0.05). No statistically significant differences were observed between two plans for the mean doses in rectum, left and right femur heads. Compared with plan1, the average monitor units reduced 16% in plan 2. Conclusion: The IMRT plan based on beam angle optimization for cervical cancer could reduce the dose delivered to bladder and also reduce MU. Therefore there were some dosimetric advantages in the IMRT plan with beam angle optimization for cervical cancer.« less
Community participation to design rural primary healthcare services.
Farmer, Jane; Nimegeer, Amy
2014-03-21
This paper explores how community participation can be used in designing rural primary healthcare services by describing a study of Scottish communities. Community participation is extolled in healthcare policy as useful in planning services and is understood as particularly relevant in rural settings, partly due to high social capital. Literature describes many community participation methods, but lacks discussion of outcomes relevant to health system reconfiguration. There is a spectrum of ideas in the literature on how to design services, from top-down standard models to contextual plans arising from population health planning that incorporates community participation. This paper addresses an evidence gap about the outcomes of using community participation in (re)designing rural community health services. Community-based participatory action research was applied in four Scottish case study communities in 2008-10. Data were collected from four workshops held in each community (total 16) and attended by community members. Workshops were intended to produce hypothetical designs for future service provision. Themes, rankings and selections from workshops are presented. Community members identified consistent health priorities, including local practitioners, emergency triage, anticipatory care, wellbeing improvement and health volunteering. Communities designed different service models to address health priorities. One community did not design a service model and another replicated the current model despite initial enthusiasm for innovation. Communities differ in their receptiveness to engaging in innovative service design, but some will create new models that fit in a given budget. Design diversity indicates that context influences local healthcare planning, suggesting community participation impacts on design outcomes, but standard service models maybe useful as part of the evidence in community participation discussions.
Update on optical design of adaptive optics system at Lick Observatory
NASA Astrophysics Data System (ADS)
Bauman, Brian J.; Gavel, Donald T.; Waltjen, Kenneth E.; Freeze, Gary J.; Hurd, Randall L.; Gates, Elinor L.; Max, Claire E.; Olivier, Scot S.; Pennington, Deanna M.
2002-02-01
In 1999, we presented our plan to upgrade the adaptive optics (AO) system on the Lick Observatory Shane telescope (3m) from a prototype instrument pressed into field service to a facility instrument. This paper updates the progress of that plan and details several important improvements in the alignment and calibration of the AO bench. The paper also includes a discussion of the problems seen in the original design of the tip/tilt (t/t) sensor used in laser guide star mode, and how these problems were corrected with excellent results.
Update on Optical Design of Adaptive Optics System at Lick Observatory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bauman, B J; Gavel, D T; Waltjen, K E
2001-07-31
In 1999, we presented our plan to upgrade the adaptive optics (AO) system on the Lick Observatory Shane telescope (3m) from a prototype instrument pressed into field service to a facility instrument. This paper updates the progress of that plan and details several important improvements in the alignment and calibration of the AO bench. The paper also includes a discussion of the problems seen in the original design of the tip/tilt (t/t) sensor used in laser guide star mode, and how these problems were corrected with excellent results.
Secondary Containment Design for the LLNL B801 Diala Oil Tank
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mertesdorf, E.
2016-12-14
Design is to add an extension to the secondary containment of tank T1-A3 at building 801. Piping from the inner tank penetrates the secondary containment tank below the liquid level of the primary tank. To meet Oil Pollution Prevention Regulation 40 CFR 120.7 the single wall piping needs to be provided with secondary containment. Steel Tank Institute (STI) conference publication states: §112.3(d)(1)(iii) –SPCC Plan requirements- Systems shall be designed in accordance with good engineering practice, including consideration of applicable industry standards and that procedures for required inspections and testing have been established. Section 112.7(a)(2) allows for deviations from specific rulemore » requirements, provided the Owner/operator responsible to select, document and implement alternate measure and a PE certifies the SPCC Plan in accordance with good engineering practices, including consideration of industry standards« less
NASA Astrophysics Data System (ADS)
Zuloaga, P.; Ordoñez, M.; Andrade, C.; Castellote, M.
2011-04-01
The generic design of the centralised spent fuel storage facility was approved by the Spanish Safety Authority in 2006. The planned operational life is 60 years, while the design service life is 100 years. Durability studies and surveillance of the behaviour have been considered from the initial design steps, taking into account the accessibility limitations and temperatures involved. The paper presents an overview of the ageing management program set in support of the Performance Assessment and Safety Review of El Cabril low and intermediate level waste (LILW) disposal facility. Based on the experience gained for LILW, ENRESA has developed a preliminary definition of the Ageing Management Plan for the Centralised Interim Storage Facility of spent Fuel and High Level Waste (HLW), which addresses the behaviour of spent fuel, its retrievability, the confinement system and the reinforced concrete structure. It includes tests plans and surveillance design considerations, based on the El Cabril LILW disposal facility.
SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiang, S; Tianjin Medical University Cancer Institute and Hospital; Yang, Y
Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developedmore » tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.« less
IBM PC/IX operating system evaluation plan
NASA Technical Reports Server (NTRS)
Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros
1984-01-01
An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.
ERIC Educational Resources Information Center
Highsmith, Joni Bitman
Stickybear's Math Splash is a CD-ROM-based software tool for teaching mathematics skills beyond simple number recognition to elementary students. The accompanying printed lesson plans are designed to complement mathematics skills with other methods and areas of emphasis including kinesthetic learning, listening skills, decision making skills, and…
Loren D. Kellogg; Stephen J. Pilkerton
2013-01-01
Since the early 1990s, several studies have been undertaken to determine the planning requirements, productivity, costs, and residual stand damage of harvest operations in thinning treatments designed to promote development of complex forest structure in order to enhance ecological functioning and biological diversity. Th ese studies include the Oregon State...
Planning the National Agricultural Library's Multimedia CD-ROM "Ornamental Horticulture."
ERIC Educational Resources Information Center
Mason, Pamela R.
1991-01-01
Discussion of issues involved in planning a multimedia CD-ROM product explains the selection of authoring tools, the design of a user interface, expert systems, text conversion and capture (including scanning and optical character recognition), and problems associated with image files. The use of audio is also discussed, and a 14-item glossary is…
ERIC Educational Resources Information Center
Macconnell, James D., And Others
The twelfth in a series also including guides for facilities for medical x-ray technologist, medical assistant, and medical secretary programs, the document is intended for use in the preparation of educational specifications for facilities for dental laboratory technician programs. Designed for use by those responsible for planning facilities,…
Clinton's Child Care Plan: Helping Families to Secure and Pay for Child Care. Family Review.
ERIC Educational Resources Information Center
Lindjord, Denise
1998-01-01
Reviews features of President Bill Clinton's proposed $22 billion child care plan, a set of spending measures and tax credits designed to make child care more affordable, available, and safe for low- and middle-income families. Features noted include Head Start and after-school programs, and business tax credits. (HTH)
Computer Processing 10-20-30. Teacher's Manual. Senior High School Teacher Resource Manual.
ERIC Educational Resources Information Center
Fisher, Mel; Lautt, Ray
Designed to help teachers meet the program objectives for the computer processing curriculum for senior high schools in the province of Alberta, Canada, this resource manual includes the following sections: (1) program objectives; (2) a flowchart of curriculum modules; (3) suggestions for short- and long-range planning; (4) sample lesson plans;…
Adaptive management of forest ecosystems: did some rubber hit the road?
B.T. Bormann; R.W. Haynes; J.R. Martin
2007-01-01
Although many scientists recommend adaptive management for large forest tracts, there is little evidence that its use has been effective at this scale. One exception is the 10-million-hectare Northwest Forest Plan, which explicitly included adaptive management in its design. Evidence from 10 years of implementing the plan suggests that formalizing adaptive steps and...
ERIC Educational Resources Information Center
Herr, Judith; And Others
This collection of nutrition education materials is designed for use in inservice training workshops for day care personnel. The document includes a listing of good nutrition concepts, suggestions for cooking in the classroom, meal planning ideas, lesson plan forms and objectives, suggestions for involving parents in nutrition education, and…
An Introduction to Eye Safety. General Metals I, Lesson Plan No. 1.
ERIC Educational Resources Information Center
Higa, Floyd
Designed for a 110-hour general metals course, this lesson plan presents an introduction to eye safety, including a brief guided imagery prelude, an overview of the lesson, an overview of Occupational Safety and Health Administration (OSHA) and Department of Occupational Safety and Health (DOSH) rules and regulations regarding eye and face…
ERIC Educational Resources Information Center
DeSensi, Frank; Rostov, Susan
These lesson plans are designed for use by high school social studies teachers who take their students on a field trip to the regional airports of Louisville, Kentucky. Twelve lesson plans are included: "It's the Computer's Fault"; "The Play's the Thing"; "A Hub! Yes, There's the Rub!"; "People and…
ERIC Educational Resources Information Center
DeSensi, Frank; Rostov, Susan
These lesson plans are designed for use by elementary school social studies teachers who take their classes to tour the regional airports of Louisville, Kentucky. Fifteen lesson plans are included: "That's My Team"; "Who Said That?""Me? Fly?"; "I Know It's Around Here Someplace!"; "How Far Did You…
ERIC Educational Resources Information Center
National Highway Traffic Safety Administration (DOT), Washington, DC.
This instructor's lesson plan guide on pediatrics and neonatal transport is one of fifteen modules designed for use in the training of emergency medical technicians (paramedics). Five units of study are presented: (1) approach to the pediatric patient including patient assessment; (2) pathophysiology and management of problems unique to the…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-02
... listed in the FOR FURTHER INFORMATION CONTACT section to view the hard copy of the docket. You may view... to illustrate your concerns, and suggest alternatives. g. Explain your views as clearly as possible... years following designation--i.e., until 2014--and must include contingency measures. In May 20, 2005...
A Step by Step Guide for Planning a Japanese Cultural Festival.
ERIC Educational Resources Information Center
Murphy, Carole
Teachers at all academic levels can adapt the design and content of the sixth grade Japanese cultural festival detailed in this learning packet. Material is divided into 2 sections. Section 1 provides a step-by-step guide to planning and conducting the festival. These instructions, based on 5 years of experience, include a detailed planning…
In situ gas treatment technology demonstration test plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thornton, E.C.; Miller, R.D.
1996-02-16
This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.
Patient Activities Planning and Progress Noting a Humanistic Integrated-Team Approach.
ERIC Educational Resources Information Center
Muilenburg, Ted
This document outlines a system for planning recreation therapy, documenting progress, and relating the entire process to a team approach which includes patient assessment and involvement. The recreation program is seen as therapeutic, closely related to the total medical treatment program. The model is designed so that it can be adapted to almost…
Hinode/EIS science planning and operations tools
NASA Astrophysics Data System (ADS)
Rainnie, Jonn A.
2016-07-01
We present the design, implementation and maintenance of the suite of software enabling scientists to design and schedule Hinode/EIS1 operations. The total of this software is the EIS Science Planning Tools (EISPT), and is predominately written in IDL (Interactive Data Language), coupled with SolarSoft (SSW), an IDL library developed for solar missions. Hinode is a multi-instrument and wavelength mission designed to observe the Sun. It is a joint Japan/UK/US consortium (with ESA and Norwegian involvement). Launched in September 2006, its principal scientific goals are to study the Sun's variability and the causes of solar activity. Hinode operations are coordinated at ISAS (Tokyo, Japan). A daily Science Operations meeting is attended by the instrument teams and the spacecraft team. Nominally, science plan uploads cover periods of two or three days. When the forthcoming operations have been agreed, the necessary spacecraft operations parameters are created. These include scheduling for spacecraft pointing and ground stations. The Extreme UV Imaging Spectrometer (EIS) instrument, led by the UK (the PI institute is MSSL), is designed to observe the emission spectral lines of the solar atmosphere. Observations are composed of reusable, hierarchical components, including lines lists (wavelengths of spectral lines), rasters (exposure times, line list, etc.) and studies (defines one or more rasters). Studies are the basic unit of "timeline" scheduling. They are a useful construct for generating more complex sequences of observations, reducing the planning burden. Instrument observations must first be validated. An initial requirement was that operations be shared equally by the 3 main EIS teams (Japan, UK and US). Hence, a major design focus of the software was "Remote Operations", whereby any scientist in any location can run the software, schedule a science plan and send it to the spacecraft commanding team. It would then be validated and combined with the science plans of the other instruments. Then uploaded to the spacecraft. As for any space mission, telemetry size and rate are important constraints. For each planning cycle the instruments are issued a maximum data allocation. EISPT interactively calculates the telemetry requirements of each observation and plan. Autonomous operations was a challenging concept designed to observe the early onset of various dynamic events, including solar flares. The planning cycle precluded observers responding to such short-term events. Hence, the instrument can be run in a (low-telemetry) "hunter" mode at a suitable target. Upon detecting an event the current observation ceases and another automatically begins at the event location. This "response" observation involves a smaller field-of-view and higher cadence. It's impossible to predict if this mechanism will be activated, and if so how much telemetry is acquired. The EISPT has operated successfully since it was deployed in November 2006. Nominally it is used six days a week. It has been maintained and updated as required to take account of changing mission operations. A large update was made in 2013/14 to develop the facility to coordinate observations with other solar missions (SDO/AIA and IRIS).
Incorporating bioenergy into sustainable landscape designs
Dale, Virginia H.; Kline, Keith L.; Buford, Marilyn A.; ...
2015-12-30
In this paper, we describe an approach to landscape design that focuses on integrating bioenergy production with other components of environmental, social and economic systems. Landscape design as used here refers to a spatially explicit, collaborative plan for management of landscapes and supply chains. Landscape design can involve multiple scales and build on existing practices to reduce costs or enhance services. Appropriately applied to a specific context, landscape design can help people assess trade-offs when making choices about locations, types of feedstock, transport, refining and distribution of bioenergy products and services. The approach includes performance monitoring and reporting along themore » bioenergy supply chain. Examples of landscape design applied to bioenergy production systems are presented. Barriers to implementation of landscape design include high costs, the need to consider diverse land-management objectives from a wide array of stakeholders, up-front planning requirements, and the complexity and level of effort needed for successful stakeholder involvement. A landscape design process may be stymied by insufficient data or participation. An impetus for coordination is critical, and incentives may be required to engage landowners and the private sector. In conclusion, devising and implementing landscape designs for more sustainable outcomes require clear communication of environmental, social, and economic opportunities and concerns.« less
Incorporating bioenergy into sustainable landscape designs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dale, Virginia H.; Kline, Keith L.; Buford, Marilyn A.
In this paper, we describe an approach to landscape design that focuses on integrating bioenergy production with other components of environmental, social and economic systems. Landscape design as used here refers to a spatially explicit, collaborative plan for management of landscapes and supply chains. Landscape design can involve multiple scales and build on existing practices to reduce costs or enhance services. Appropriately applied to a specific context, landscape design can help people assess trade-offs when making choices about locations, types of feedstock, transport, refining and distribution of bioenergy products and services. The approach includes performance monitoring and reporting along themore » bioenergy supply chain. Examples of landscape design applied to bioenergy production systems are presented. Barriers to implementation of landscape design include high costs, the need to consider diverse land-management objectives from a wide array of stakeholders, up-front planning requirements, and the complexity and level of effort needed for successful stakeholder involvement. A landscape design process may be stymied by insufficient data or participation. An impetus for coordination is critical, and incentives may be required to engage landowners and the private sector. In conclusion, devising and implementing landscape designs for more sustainable outcomes require clear communication of environmental, social, and economic opportunities and concerns.« less
Collaborative Mission Design at NASA Langley Research Center
NASA Technical Reports Server (NTRS)
Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.
2005-01-01
NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Building a High-Tech Library in a Period of Austerity.
ERIC Educational Resources Information Center
Bazillion, Richard J.; Scott, Sue
1991-01-01
Describes the planning process for designing a new library for Algoma University College (Ontario). Topics discussed include the building committee, library policy, design considerations, an electric system that supports computer technology, library automation, the online public access catalog (OPAC), furnishings and interior environment, and…
ERIC Educational Resources Information Center
Slessor, Catherine
2000-01-01
Discusses a joint venture project that succeeded in designing a large, new, award-winning addition to a college campus at a cost of just $30 per square foot. Design features, Floor plans, and photographs are included. (GR)
A Preliminary Operations Manual for Vocational Assessment of Special Needs Students.
ERIC Educational Resources Information Center
Petzy, Vic
This document is designed to assist school personnel in the planning, development, and implementation of vocational assessment approaches for special needs students. The intended audience includes administrators, coordinators, counsellors, or teachers who are interested in designing vocational assessment procedures which maximize the use of…
Design issues for LISA inertial sensors
NASA Astrophysics Data System (ADS)
Vitale, Stefano; Speake, Clive
1998-12-01
In this paper we discuss a few design issues of the inertial sensor for LISA. These issues include the role of the stiffness and the losses that are introduced by the readout and by other parasitic sources. A possible plan for testing those effects on ground is also discussed.
48 CFR 3452.224-71 - Notice about research activities involving human subjects.
Code of Federal Regulations, 2012 CFR
2012-10-01
... research as “a systematic investigation, including research development, testing and evaluation, designed... deliberate plan designed to develop or contribute to generalizable knowledge, it is research. Research... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Notice about research...
48 CFR 3452.224-71 - Notice about research activities involving human subjects.
Code of Federal Regulations, 2011 CFR
2011-10-01
... research as “a systematic investigation, including research development, testing and evaluation, designed... deliberate plan designed to develop or contribute to generalizable knowledge, it is research. Research... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Notice about research...
48 CFR 3452.224-71 - Notice about research activities involving human subjects.
Code of Federal Regulations, 2013 CFR
2013-10-01
... research as “a systematic investigation, including research development, testing and evaluation, designed... deliberate plan designed to develop or contribute to generalizable knowledge, it is research. Research... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Notice about research...
48 CFR 3452.224-71 - Notice about research activities involving human subjects.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research as “a systematic investigation, including research development, testing and evaluation, designed... deliberate plan designed to develop or contribute to generalizable knowledge, it is research. Research... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Notice about research...
Multi-Protocol LAN Design and Implementation: A Case Study.
ERIC Educational Resources Information Center
Hazari, Sunil
1995-01-01
Reports on the installation of a local area network (LAN) at East Carolina University. Topics include designing the network; computer labs and electronic mail; Internet connectivity; LAN expenses; and recommendations on planning, equipment, administration, and training. A glossary of networking terms is also provided. (AEF)
Two Approaches to Engineering Design:Observations in sTEm Education
ERIC Educational Resources Information Center
Kelley, Todd R.; Brenner, Daniel C.; Pieper, Jon T.
2010-01-01
A comparative study was conducted to compare two approaches to engineering design curriculum across different schools (inter-school) and across two curricula "Project Lead the Way and Engineering Projects in Community Service" (inter-curricula). The researchers collected curricula material including handouts, lesson plans, guides,…
Analytical study of the Atmospheric Cloud Physics Laboratory (ACPL) experiments
NASA Technical Reports Server (NTRS)
Davis, M. H.
1977-01-01
The design specifications of the research laboratory as a Spacelab facility are discussed along with the types of planned experiments. These include cloud formation, freezing and scavenging, and electrical phenomena. A summary of the program conferences is included.
Planning for retirement from medicine: a mixed-methods study.
Pannor Silver, Michelle; Easty, Laura K
2017-01-01
Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees.
Planning for retirement from medicine: a mixed-methods study
Pannor Silver, Michelle; Easty, Laura K.
2017-01-01
Background: Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. Methods: We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Results: Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Interpretation: Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees. PMID:28401128
Cave Buttes Dam Master Plan, Phoenix, Arizona and Vicinity (Including New River).
1982-03-01
Mar. 1975 Arizona, Hydrology, Part 1 3 New River and Phoenix City Streams, Mar. 1976 July 1977 Arizona, Design Memorandum No. 3, (SPD App) General ...with Maricopa County, Arizona CEQ) 3 New River and Phoenix City Streams, Arizona, Design Memorandum No. 3, General Design Memorandum--Phase II, Project...Hydrology Part 2 3 New River and Phoenix City Streams, Arizona, Design Memorandum No. 3, General Design Memorandum--Phase II, Project Design Part 3
40 CFR 62.10100 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS FOR DESIGNATED FACILITIES AND POLLUTANTS South Carolina... Identification of plan. (a) Identification of plan. South Carolina Designated Facility Plan (Section 111(d) Plan). (b) The plan was officially submitted as follows: (1) Implementation Plan for Control of Designated...
Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.
West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra
2017-01-01
The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.
TU-AB-BRB-01: Coverage Evaluation and Probabilistic Treatment Planning as a Margin Alternative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siebers, J.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xu, H.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
TU-AB-BRB-02: Stochastic Programming Methods for Handling Uncertainty and Motion in IMRT Planning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Unkelbach, J.
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
NASA Technical Reports Server (NTRS)
Cavanaugh, J.
1994-01-01
This plan describes methods and procedures Aerojet will follow in the implementation of configuration control for each established baseline. The plan is written in response to the GSFC EOS CM Plan 420-02-02, dated January 1990, and also meets he requirements specified in DOD-STD-480, DOD-D 1000B, MIL-STD-483A, and MIL-STD-490B. The plan establishes the configuration management process to be used for the deliverable hardware, software, and firmware of the EOS/AMSU-A during development, design, fabrication, test, and delivery. This revision includes minor updates to reflect Aerojet's CM policies.
Local Emergency Planning Committee (LEPC) Data
The LEPC data set contains over 3000 listings, as of 2008, for name and location data identifying Local Emergency Planning Committees (LEPCs). LEPCs are people responsible to develop an emergency response plan, review it at least annually, and provide information about chemicals in the community to citizens. Plans are developed by LEPCs with stakeholder participation. There is one LEPC for each of the more than 3,000 designated local emergency planning districts. The LEPC membership must include (at a minimum): Elected state and local officials; Police, fire, civil defense, and public health professionals; Environment, transportation, and hospital officials; Facility representatives; Representatives from community groups and the media.
A summary of lateral-stability derivatives calculated for wing plan forms in supersonic flow
NASA Technical Reports Server (NTRS)
Jones, Arthur L; Alksne, Alberta
1951-01-01
A compilation of theoretical values of the lateral-stability derivatives for wings at supersonic speeds is presented in the form of design charts. The wing plan forms for which this compilation has been prepared include a rectangular, two trapezoidal, two triangular, a fully-tapered swept-back, a sweptback hexagonal, an unswept hexagonal, and a notched triangular plan form. A full set of results, that is, values for all nine of the lateral-stability derivatives for wings, was available for the first six of these plan forms only. The reasons for the incompleteness of the results available for other plan forms are discussed.
Hospital-based expert model for health technology procurement planning in hospitals.
Miniati, R; Cecconi, G; Frosini, F; Dori, F; Regolini, J; Iadanza, E; Biffi Gentili, G
2014-01-01
Although in the last years technology innovation in healthcare brought big improvements in care level and patient quality of life, hospital complexity and management cost became higher. For this reason, necessity of planning for medical equipment procurement within hospitals is getting more and more important in order to sustainable provide appropriate technology for both routine activity and innovative procedures. In order to support hospital decision makers for technology procurement planning, an expert model was designed as reported in the following paper. It combines the most widely used approaches for technology evaluation by taking into consideration Health Technology Assessment (HTA) and Medical Equipment Replacement Model (MERM). The designing phases include a first definition of prioritization algorithms, then the weighting process through experts' interviews and a final step for the model validation that included both statistical testing and comparison with real decisions. In conclusion, the designed model was able to provide a semi-automated tool that through the use of multidisciplinary information is able to prioritize different requests of technology acquisition in hospitals. Validation outcomes improved the model accuracy and created different "user profiles" according to the specific needs of decision makers.
Planning Coverage Campaigns for Mission Design and Analysis: Clasp for the Proposed DESDynI Mission
NASA Technical Reports Server (NTRS)
Knight, Russell; McLaren, David; Hu, Steven
2012-01-01
Mission design and analysis present challenges in that almost all variables are in constant flux, yet the goal is to achieve an acceptable level of performance against a concept of operations, which might also be in flux. To increase responsiveness, our approach is to use automated planning tools that allow for the continual modification of spacecraft, ground system, staffing, and concept of operations while returning metrics that are important to mission evaluation, such as area covered, peak memory usage, and peak data throughput. We have applied this approach to DESDynI (Deformation, Ecosystem Structure, and Dynamics of Ice) mission design concept using the CLASP (Compressed Large-scale Activity Scheduler/Planner) planning system [7], but since this adaptation many techniques have changed under the hood for CLASP and the DESDynI mission concept has undergone drastic changes, including that it has been renamed the Earth Radar Mission. Over the past two years, we have run more than fifty simulations with the CLASP-DESDynI adaptation, simulating different mission scenarios with changing parameters including targets, swaths, instrument modes, and data and downlink rates. We describe the evolution of simulations through the DESDynI MCR (Mission Concept Review) and afterwards.
Volcanism-Climate Interactions
NASA Technical Reports Server (NTRS)
Walter, Louis S. (Editor); Desilva, Shanaka (Editor)
1991-01-01
The range of disciplines in the study of volcanism-climate interactions includes paleoclimate, volcanology, petrology, tectonics, cloud physics and chemistry, and climate and radiation modeling. Questions encountered in understanding the interactions include: the source and evolution of sulfur and sulfur-gaseous species in magmas; their entrainment in volcanic plumes and injection into the stratosphere; their dissipation rates; and their radiative effects. Other issues include modeling and measuring regional and global effects of such large, dense clouds. A broad-range plan of research designed to answer these questions was defined. The plan includes observations of volcanoes, rocks, trees, and ice cores, as well as satellite and aircraft observations of erupting volcanoes and resulting lumes and clouds.
NASA Astrophysics Data System (ADS)
Anderle, Kristjan; Stroom, Joep; Vieira, Sandra; Pimentel, Nuno; Greco, Carlo; Durante, Marco; Graeff, Christian
2018-01-01
Intensity modulated particle therapy (IMPT) can produce highly conformal plans, but is limited in advanced lung cancer patients with multiple lesions due to motion and planning complexity. A 4D IMPT optimization including all motion states was expanded to include multiple targets, where each target (isocenter) is designated to specific field(s). Furthermore, to achieve stereotactic treatment planning objectives, target and OAR weights plus objective doses were automatically iteratively adapted. Finally, 4D doses were calculated for different motion scenarios. The results from our algorithm were compared to clinical stereotactic body radiation treatment (SBRT) plans. The study included eight patients with 24 lesions in total. Intended dose regimen for SBRT was 24 Gy in one fraction, but lower fractionated doses had to be delivered in three cases due to OAR constraints or failed plan quality assurance. The resulting IMPT treatment plans had no significant difference in target coverage compared to SBRT treatment plans. Average maximum point dose and dose to specific volume in OARs were on average 65% and 22% smaller with IMPT. IMPT could also deliver 24 Gy in one fraction in a patient where SBRT was limited due to the OAR vicinity. The developed algorithm shows the potential of IMPT in treatment of multiple moving targets in a complex geometry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nguyen, Dan; Ruan, Dan; O’Connor, Daniel
Purpose: To deliver high quality intensity modulated radiotherapy (IMRT) using a novel generalized sparse orthogonal collimators (SOCs), the authors introduce a novel direct aperture optimization (DAO) approach based on discrete rectangular representation. Methods: A total of seven patients—two glioblastoma multiforme, three head & neck (including one with three prescription doses), and two lung—were included. 20 noncoplanar beams were selected using a column generation and pricing optimization method. The SOC is a generalized conventional orthogonal collimators with N leaves in each collimator bank, where N = 1, 2, or 4. SOC degenerates to conventional jaws when N = 1. For SOC-basedmore » IMRT, rectangular aperture optimization (RAO) was performed to optimize the fluence maps using rectangular representation, producing fluence maps that can be directly converted into a set of deliverable rectangular apertures. In order to optimize the dose distribution and minimize the number of apertures used, the overall objective was formulated to incorporate an L2 penalty reflecting the difference between the prescription and the projected doses, and an L1 sparsity regularization term to encourage a low number of nonzero rectangular basis coefficients. The optimization problem was solved using the Chambolle–Pock algorithm, a first-order primal–dual algorithm. Performance of RAO was compared to conventional two-step IMRT optimization including fluence map optimization and direct stratification for multileaf collimator (MLC) segmentation (DMS) using the same number of segments. For the RAO plans, segment travel time for SOC delivery was evaluated for the N = 1, N = 2, and N = 4 SOC designs to characterize the improvement in delivery efficiency as a function of N. Results: Comparable PTV dose homogeneity and coverage were observed between the RAO and the DMS plans. The RAO plans were slightly superior to the DMS plans in sparing critical structures. On average, the maximum and mean critical organ doses were reduced by 1.94% and 1.44% of the prescription dose. The average number of delivery segments was 12.68 segments per beam for both the RAO and DMS plans. The N = 2 and N = 4 SOC designs were, on average, 1.56 and 1.80 times more efficient than the N = 1 SOC design to deliver. The mean aperture size produced by the RAO plans was 3.9 times larger than that of the DMS plans. Conclusions: The DAO and dose domain optimization approach enabled high quality IMRT plans using a low-complexity collimator setup. The dosimetric quality is comparable or slightly superior to conventional MLC-based IMRT plans using the same number of delivery segments. The SOC IMRT delivery efficiency can be significantly improved by increasing the leaf numbers, but the number is still significantly lower than the number of leaves in a typical MLC.« less
Nguyen, Dan; Ruan, Dan; O'Connor, Daniel; Woods, Kaley; Low, Daniel A; Boucher, Salime; Sheng, Ke
2016-02-01
To deliver high quality intensity modulated radiotherapy (IMRT) using a novel generalized sparse orthogonal collimators (SOCs), the authors introduce a novel direct aperture optimization (DAO) approach based on discrete rectangular representation. A total of seven patients-two glioblastoma multiforme, three head & neck (including one with three prescription doses), and two lung-were included. 20 noncoplanar beams were selected using a column generation and pricing optimization method. The SOC is a generalized conventional orthogonal collimators with N leaves in each collimator bank, where N = 1, 2, or 4. SOC degenerates to conventional jaws when N = 1. For SOC-based IMRT, rectangular aperture optimization (RAO) was performed to optimize the fluence maps using rectangular representation, producing fluence maps that can be directly converted into a set of deliverable rectangular apertures. In order to optimize the dose distribution and minimize the number of apertures used, the overall objective was formulated to incorporate an L2 penalty reflecting the difference between the prescription and the projected doses, and an L1 sparsity regularization term to encourage a low number of nonzero rectangular basis coefficients. The optimization problem was solved using the Chambolle-Pock algorithm, a first-order primal-dual algorithm. Performance of RAO was compared to conventional two-step IMRT optimization including fluence map optimization and direct stratification for multileaf collimator (MLC) segmentation (DMS) using the same number of segments. For the RAO plans, segment travel time for SOC delivery was evaluated for the N = 1, N = 2, and N = 4 SOC designs to characterize the improvement in delivery efficiency as a function of N. Comparable PTV dose homogeneity and coverage were observed between the RAO and the DMS plans. The RAO plans were slightly superior to the DMS plans in sparing critical structures. On average, the maximum and mean critical organ doses were reduced by 1.94% and 1.44% of the prescription dose. The average number of delivery segments was 12.68 segments per beam for both the RAO and DMS plans. The N = 2 and N = 4 SOC designs were, on average, 1.56 and 1.80 times more efficient than the N = 1 SOC design to deliver. The mean aperture size produced by the RAO plans was 3.9 times larger than that of the DMS plans. The DAO and dose domain optimization approach enabled high quality IMRT plans using a low-complexity collimator setup. The dosimetric quality is comparable or slightly superior to conventional MLC-based IMRT plans using the same number of delivery segments. The SOC IMRT delivery efficiency can be significantly improved by increasing the leaf numbers, but the number is still significantly lower than the number of leaves in a typical MLC.
Tetsworth, Kevin; Block, Steve; Glatt, Vaida
2017-01-01
3D printing technology has revolutionized and gradually transformed manufacturing across a broad spectrum of industries, including healthcare. Nowhere is this more apparent than in orthopaedics with many surgeons already incorporating aspects of 3D modelling and virtual procedures into their routine clinical practice. As a more extreme application, patient-specific 3D printed titanium truss cages represent a novel approach for managing the challenge of segmental bone defects. This review illustrates the potential indications of this innovative technique using 3D printed titanium truss cages in conjunction with the Masquelet technique. These implants are custom designed during a virtual surgical planning session with the combined input of an orthopaedic surgeon, an orthopaedic engineering professional and a biomedical design engineer. The ability to 3D model an identical replica of the original intact bone in a virtual procedure is of vital importance when attempting to precisely reconstruct normal anatomy during the actual procedure. Additionally, other important factors must be considered during the planning procedure, such as the three-dimensional configuration of the implant. Meticulous design is necessary to allow for successful implantation through the planned surgical exposure, while being aware of the constraints imposed by local anatomy and prior implants. This review will attempt to synthesize the current state of the art as well as discuss our personal experience using this promising technique. It will address implant design considerations including the mechanical, anatomical and functional aspects unique to each case. PMID:28220752
Tetsworth, Kevin; Block, Steve; Glatt, Vaida
2017-01-01
3D printing technology has revolutionized and gradually transformed manufacturing across a broad spectrum of industries, including healthcare. Nowhere is this more apparent than in orthopaedics with many surgeons already incorporating aspects of 3D modelling and virtual procedures into their routine clinical practice. As a more extreme application, patient-specific 3D printed titanium truss cages represent a novel approach for managing the challenge of segmental bone defects. This review illustrates the potential indications of this innovative technique using 3D printed titanium truss cages in conjunction with the Masquelet technique. These implants are custom designed during a virtual surgical planning session with the combined input of an orthopaedic surgeon, an orthopaedic engineering professional and a biomedical design engineer. The ability to 3D model an identical replica of the original intact bone in a virtual procedure is of vital importance when attempting to precisely reconstruct normal anatomy during the actual procedure. Additionally, other important factors must be considered during the planning procedure, such as the three-dimensional configuration of the implant. Meticulous design is necessary to allow for successful implantation through the planned surgical exposure, while being aware of the constraints imposed by local anatomy and prior implants. This review will attempt to synthesize the current state of the art as well as discuss our personal experience using this promising technique. It will address implant design considerations including the mechanical, anatomical and functional aspects unique to each case. © The Authors, published by EDP Sciences, 2017.
NASA Technical Reports Server (NTRS)
Ryan, John J.; Bosworth, John T.; Burken, John J.; Suh, Peter M.
2014-01-01
The X-56 Multi-Utility Technology Testbed aircraft system is a versatile experimental research flight platform. The system was primarily designed to investigate active control of lightweight flexible structures, but is reconfigurable and capable of hosting a wide breadth of research. Current research includes flight experimentation of a Lockheed Martin designed active control flutter suppression system. Future research plans continue experimentation with alternative control systems, explore the use of novel sensor systems, and experiments with the use of novel control effectors. This paper describes the aircraft system, current research efforts designed around the system, and future planned research efforts that will be hosted on the aircraft system.
Biourbanism: Solar based urban and regional design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, D.
1999-07-01
New neighborhoods for an additional one billion people will need to be constructed on the planet within the next 10 years. If the historic patterns of growth continue--the sprawl, the congestion, the draining of swamps, the loss of agricultural land--the requirement for all basic resources will outstrip the availability. While this is of great concern, it is the destruction of an acceptable quality of life--the sense of place--that will be the most difficult and expensive to change. An essential step to reverse the direction of this undesirable future is changing the design and planning of these communities to work withmore » resident solar energies, regional biology, local renewable resources, and sustainable urban planning and design principles. Design can make a difference. This paper develops the view that the solar approach must include urban and regional design and presents solar-based renewable resources example of the design of regions.« less
TU-AB-BRB-00: New Methods to Ensure Target Coverage
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2015-06-15
The accepted clinical method to accommodate targeting uncertainties inherent in fractionated external beam radiation therapy is to utilize GTV-to-CTV and CTV-to-PTV margins during the planning process to design a PTV-conformal static dose distribution on the planning image set. Ideally, margins are selected to ensure a high (e.g. >95%) target coverage probability (CP) in spite of inherent inter- and intra-fractional positional variations, tissue motions, and initial contouring uncertainties. Robust optimization techniques, also known as probabilistic treatment planning techniques, explicitly incorporate the dosimetric consequences of targeting uncertainties by including CP evaluation into the planning optimization process along with coverage-based planning objectives. Themore » treatment planner no longer needs to use PTV and/or PRV margins; instead robust optimization utilizes probability distributions of the underlying uncertainties in conjunction with CP-evaluation for the underlying CTVs and OARs to design an optimal treated volume. This symposium will describe CP-evaluation methods as well as various robust planning techniques including use of probability-weighted dose distributions, probability-weighted objective functions, and coverage optimized planning. Methods to compute and display the effect of uncertainties on dose distributions will be presented. The use of robust planning to accommodate inter-fractional setup uncertainties, organ deformation, and contouring uncertainties will be examined as will its use to accommodate intra-fractional organ motion. Clinical examples will be used to inter-compare robust and margin-based planning, highlighting advantages of robust-plans in terms of target and normal tissue coverage. Robust-planning limitations as uncertainties approach zero and as the number of treatment fractions becomes small will be presented, as well as the factors limiting clinical implementation of robust planning. Learning Objectives: To understand robust-planning as a clinical alternative to using margin-based planning. To understand conceptual differences between uncertainty and predictable motion. To understand fundamental limitations of the PTV concept that probabilistic planning can overcome. To understand the major contributing factors to target and normal tissue coverage probability. To understand the similarities and differences of various robust planning techniques To understand the benefits and limitations of robust planning techniques.« less
ERIC Educational Resources Information Center
Hirumi, Atsusi
2013-01-01
Advances in technology offer a vast array of opportunities for facilitating elearning. However, difficulties may arise if elearning research and design, including the use of emerging technologies, are based primarily on past practices, fads, or political agendas. This article describes refinements made to a framework for designing and sequencing…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-28
... can be considered to manufacture the Roadster. Lotus, based on its involvement in the design and..., requiring what are commonly known as ``advanced air bags.'' \\3\\ The upgrade was designed to meet the twin... effects of some air bag designs. This plan also included an extensive consumer education program to...
Code of Federal Regulations, 2010 CFR
2010-04-01
..., DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction... design and approval of the PS&E package; (2) A licensed professional engineer will certify that the PS&E meets or exceeds the design, health, and safety standards in appendix B to subpart D for an IRR...
ERIC Educational Resources Information Center
Peterson, Ken; And Others
The Park City School District (Utah) career ladder design provides a system in which teachers are positioned and paid according to successful performance and differentiation of responsibilities. It includes an evaluation system to differentiate among teachers. The career ladder design presents a number of innovations; for example, excellent…
Defining Long-Duration Traverses of Lunar Volcanic Complexes with LROC NAC Images
NASA Technical Reports Server (NTRS)
Stopar, J. D.; Lawrence, S. J.; Joliff, B. L.; Speyerer, E. J.; Robinson, M. S.
2016-01-01
A long-duration lunar rover [e.g., 1] would be ideal for investigating large volcanic complexes like the Marius Hills (MH) (approximately 300 x 330 km), where widely spaced sampling points are needed to explore the full geologic and compositional variability of the region. Over these distances, a rover would encounter varied surface morphologies (ranging from impact craters to rugged lava shields), each of which need to be considered during the rover design phase. Previous rovers including Apollo, Lunokhod, and most recently Yutu, successfully employed pre-mission orbital data for planning (at scales significantly coarser than that of the surface assets). LROC was specifically designed to provide mission-planning observations at scales useful for accurate rover traverse planning (crewed and robotic) [2]. After-the-fact analyses of the planning data can help improve predictions of future rover performance [e.g., 3-5].
23 CFR 970.212 - Federal lands safety management system (SMS).
Code of Federal Regulations, 2010 CFR
2010-04-01
... planning, design, construction, maintenance, and operations. (c) The SMS shall be designed to fit the NPS... for the collection, maintenance and reporting of a data base that includes: (i) Accident records with... standards) for low volume roads may be tailored to be consistent with the functional classification of the...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2010 CFR
2010-07-01
... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2012 CFR
2012-07-01
... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...
40 CFR Appendix A to Subpart I of... - Determination of Allowable Costs
Code of Federal Regulations, 2011 CFR
2011-07-01
... the actual reasonable and necessary costs for preparing the pre-bid package. (4) Post-construction... built in conformance with the design drawings and specifications. f. The costs (including legal... from defects in the plans, design drawings and specifications, or other subagreement documents only to...
10 CFR Appendix C to Part 73 - Nuclear Power Plant Safeguards Contingency Plans
Code of Federal Regulations, 2013 CFR
2013-01-01
... command and delegation of authority as these apply to safeguards contingencies. b. Physical Layout—(i..., up to and including the design basis threat of radiological sabotage. The goals of licensee... general description of how the response is organized. a. Perceived Danger—Consistent with the design basis...
The Four Levels of Web Site Development Expertise.
ERIC Educational Resources Information Center
Ingram, Albert L.
2000-01-01
Discusses the design of Web pages and sites and proposes a four-level model of Web development expertise that can serve as a curriculum overview or as a plan for an individual's professional development. Highlights include page design, media use, client-side processing, server-side processing, and site structure. (LRW)
Design for Change: How to Plan the School Library You Really Need.
ERIC Educational Resources Information Center
Lankford, Mary D.
1994-01-01
Examines issues that librarians need to address when remodeling or designing school libraries. Topics discussed include the librarian's role in decision making; cost considerations; evaluation of present services as well as future needs; the importance of communication; location; library technology; furniture; and the role of architects and…
Internationalizing an Interior Design Course: A Model for Global FCS Curricula
ERIC Educational Resources Information Center
Charlson, Julie; Vouchilas, Gus
2010-01-01
Accreditation for Family and Consumer Sciences and for Interior Design programs includes standards to globalize education of undergraduate students. An integrative approach to planning curriculum relates the concept of global interdependence to the development of critical thinking skills for student decision-making. This was addressed in modifying…
Revisiting Your Outdoor Environment: Reasons to Reshape, Enrich, Redevelop the Outdoor Space.
ERIC Educational Resources Information Center
Mauffette, Anne Gillain
1998-01-01
Provides suggestions for designing effective outdoor space. Focuses on advocating for space, designing spaces based on children's characteristics and preferences, integrating the outdoors in educational planning, including children in decision making and work, knowing about injury prevention, providing adult models who love the outdoors, and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-13
... CBP with authority to conduct limited test programs or procedures designed to evaluate planned... aspects of this test, including the design, conduct and implementation of the test, in order to determine... Environment (ACE); Announcement of National Customs Automation Program Test of Automated Procedures for In...
Vegetation and other development options for mitigating urban air pollution impacts
Richard Baldauf; David J. Nowak
2014-01-01
While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.
A GUIDE FOR PLANNING PHYSICAL EDUCATION AND ATHLETIC FACILITIES.
ERIC Educational Resources Information Center
New Jersey State Dept. of Education, Trenton.
THIS STUDY EXAMINES PHYSICAL EDUCATION FACILITIES, THEIR PHYSICAL NEEDS, AND RELATED DESIGN CONSIDERATIONS. A SYSTEM OF DETERMINING THE TOTAL NUMBER OF TEACHING STATIONS NEEDED IS GIVEN TO AID INITIAL REQUIREMENT ANALYSIS. INDOOR FACILITIES ANALYZED INCLUDE--(1) THE GYMNASIUM, IN TERMS OF LOCATION, SIZE, DESIGN FEATURES, AND RELATED COMPONENTS,…
ERIC Educational Resources Information Center
Walker, Mark; Kremer, Angelika; Schluter, Kirsten
2007-01-01
"The Dirty Water Challenge" is a fun activity that teaches children about their environment in an engaging and practical way. Inquiry is embedded within the practical--students have to design, plan, and then build their own design of water filter. Students are exposed to important concepts from a variety of scientific disciplines, including how…