Sample records for includes design permitting

  1. Large Advanced Space Systems (LASS) computer-aided design program additions

    NASA Technical Reports Server (NTRS)

    Farrell, C. E.

    1982-01-01

    The LSS preliminary and conceptual design requires extensive iteractive analysis because of the effects of structural, thermal, and control intercoupling. A computer aided design program that will permit integrating and interfacing of required large space system (LSS) analyses is discussed. The primary objective of this program is the implementation of modeling techniques and analysis algorithms that permit interactive design and tradeoff studies of LSS concepts. Eight software modules were added to the program. The existing rigid body controls module was modified to include solar pressure effects. The new model generator modules and appendage synthesizer module are integrated (interfaced) to permit interactive definition and generation of LSS concepts. The mass properties module permits interactive specification of discrete masses and their locations. The other modules permit interactive analysis of orbital transfer requirements, antenna primary beam n, and attitude control requirements.

  2. 40 CFR 72.41 - Phase I substitution plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...

  3. 40 CFR 72.41 - Phase I substitution plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...

  4. 40 CFR 72.41 - Phase I substitution plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...

  5. 40 CFR 72.41 - Phase I substitution plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...

  6. 40 CFR 72.41 - Phase I substitution plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) PERMITS REGULATION Acid Rain Compliance Plan and Compliance Options § 72.41 Phase I substitution... section 410 of the Act. (b)(1) The designated representative may include, in the Acid Rain permit... an Acid Rain permit containing the plan, except that if the substitution plan is conditionally...

  7. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Technology (MACT) Standards § 270.235 Options for incinerators, cement kilns, lightweight aggregate kilns... malfunction plan, design, and operating history. (2) Retain or add these permit requirements to the permit to... information including the source's startup, shutdown, and malfunction plan, design, and operating history; and...

  8. Prototype color field sequential television lens assembly

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The design, development, and evaluation of a prototype modular lens assembly with a self-contained field sequential color wheel is presented. The design of a color wheel of maximum efficiency, the selection of spectral filters, and the design of a quiet, efficient wheel drive system are included. Design tradeoffs considered for each aspect of the modular assembly are discussed. Emphasis is placed on achieving a design which can be attached directly to an unmodified camera, thus permitting use of the assembly in evaluating various candidate camera and sensor designs. A technique is described which permits maintaining high optical efficiency with an unmodified camera. A motor synchronization system is developed which requires only the vertical synchronization signal as a reference frequency input. Equations and tradeoff curves are developed to permit optimizing the filter wheel aperture shapes for a variety of different design conditions.

  9. Video display engineering and optimization system

    NASA Technical Reports Server (NTRS)

    Larimer, James (Inventor)

    1997-01-01

    A video display engineering and optimization CAD simulation system for designing a LCD display integrates models of a display device circuit, electro-optics, surface geometry, and physiological optics to model the system performance of a display. This CAD system permits system performance and design trade-offs to be evaluated without constructing a physical prototype of the device. The systems includes a series of modules which permit analysis of design trade-offs in terms of their visual impact on a viewer looking at a display.

  10. Design and evaluation of brushless electrical generators

    NASA Technical Reports Server (NTRS)

    Collins, F. A.; Ellis, J. N.

    1970-01-01

    Ten design manuals assembled and nine computer programs are developed for evaluation of proposed designs of brushless rotating electrical generators. Design manual package provides all information required for generator design, and computer programs permit calculation of performance of specific designs including effects of materials.

  11. 77 FR 29357 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... History Survey, Champaign, IL. The applicant requests a permit to take (capture and release; capture and...). Proposed activities would occur throughout the State of Illinois, including presence/absence surveys and... utilizing an experimental design to determine susceptibility of bats to turbine mortality at varying wind...

  12. 14 CFR 401.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... once. Experimental permit or permit means an authorization by the FAA to a person to launch or reenter... designed to limit or restrict the hazards to public health and safety and the safety of property presented... vehicle and includes pre- and post-flight ground operations as follows: (1) Beginning of launch. (i) Under...

  13. 14 CFR 401.5 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... once. Experimental permit or permit means an authorization by the FAA to a person to launch or reenter... designed to limit or restrict the hazards to public health and safety and the safety of property presented... vehicle and includes pre- and post-flight ground operations as follows: (1) Beginning of launch. (i) Under...

  14. Seasonal variability of near surface soil water and groundwater tables in Florida : phase II.

    DOT National Transportation Integrated Search

    2008-01-01

    The seasonal high groundwater table (SHGWT) is a critical measure for design projects requiring : surface water permits including roadway design and detention or retention pond design. Accurately : measuring and, more importantly, predicting water ta...

  15. Design and development of diborane shipping container. Volume 2, Appendix A: Record of contacts with DOT regarding special permit for 200-pound diborane shipping container

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Pertinent documents are reported of the correspondance with the Department of Transportation for obtaining and revising Special Permit no. 6522 for the shipment of diborane. The documents reported cover the period from 4 June 1971 to 22 September 1972. The design and performance of 200-pound diborane shipping containers are included along with the requests for permission to ship quantities less that 200 pounds, and less than 100 pounds.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shafer, A.L.; Purdy, S.; Tempelis, D.

    The La Paz County Regional Landfill is a 65 hectare (160 acre) municipal waste site located near the western border of Arizona between the cities of Parker and Quartzsite. The site is operated under a public/private partnership between the County of La Paz and Browning-Ferris Industries, Inc. (BFI). The County owns the landfill and infrastructure and BFI is responsible for facility improvements, environmental compliance, and daily operations. Following the initial permitting and construction of the first landfill cell, a value engineering review was conducted on the site design and permit requirements. Based on this review, substantial cost saving opportunities weremore » identified. In order to implement the value engineering ideas, the site permit was modified and a new Solid Waste Facilities Plan was Submitted to the Arizona Department of Environmental Quality. This paper discusses the value engineering modifications that were conducted, the revisions to the permits, and the relative cost savings that were realized. The areas addressed include the liner system design, closure design, disposal capacity, and operations plan. Through the use of alternative liners a cost savings of well over 50 percent (as compared to the original permit) will be realized over the life of the landfill.« less

  17. 37 CFR 212.3 - Registration of claims for protection of eligible designs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Drawings must be in black ink on white 81/2″ × 11″ unruled paper. A drawing of a design should include... of the design. Solid black surface shading is not permitted except when used to represent the black... included as a separate figure, in addition to other figures which fully disclose the subject matter of the...

  18. 37 CFR 212.3 - Registration of claims for protection of eligible designs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Drawings must be in black ink on white 81/2″ × 11″ unruled paper. A drawing of a design should include... of the design. Solid black surface shading is not permitted except when used to represent the black... included as a separate figure, in addition to other figures which fully disclose the subject matter of the...

  19. 37 CFR 212.3 - Registration of claims for protection of eligible designs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Drawings must be in black ink on white 81/2″×11″ unruled paper. A drawing of a design should include... of the design. Solid black surface shading is not permitted except when used to represent the black... included as a separate figure, in addition to other figures which fully disclose the subject matter of the...

  20. 48 CFR 227.7107-3 - Approval of restricted designs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... designs. 227.7107-3 Section 227.7107-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Rights in Technical Data 227.7107-3 Approval of restricted designs. The clause at 252.227-7024, Notice and Approval of Restricted Designs, may be included in architect-engineer contracts to permit the...

  1. Information management system study results. Volume 1: IMS study results

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The information management system (IMS) special emphasis task was performed as an adjunct to the modular space station study, with the objective of providing extended depth of analysis and design in selected key areas of the information management system. Specific objectives included: (1) in-depth studies of IMS requirements and design approaches; (2) design and fabricate breadboard hardware for demonstration and verification of design concepts; (3) provide a technological base to identify potential design problems and influence long range planning (4) develop hardware and techniques to permit long duration, low cost, manned space operations; (5) support SR&T areas where techniques or equipment are considered inadequate; and (6) permit an overall understanding of the IMS as an integrated component of the space station.

  2. Estimating the discharge for ordinary high water levels in Kansas.

    DOT National Transportation Integrated Search

    2014-09-01

    The water resource design community in Kansas, including the Kansas Department of Transportation : (KDOT), is required to obtain appropriate permits for construction projects. Projects that involve stream : modification, including drainage structures...

  3. Design of a video system providing optimal visual information for controlling payload and experiment operations with television

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A program was conducted which included the design of a set of simplified simulation tasks, design of apparatus and breadboard TV equipment for task performance, and the implementation of a number of simulation tests. Performance measurements were made under controlled conditions and the results analyzed to permit evaluation of the relative merits (effectivity) of various TV systems. Burden factors were subsequently generated for each TV system to permit tradeoff evaluation of system characteristics against performance. For the general remote operation mission, the 2-view system is recommended. This system is characterized and the corresponding equipment specifications were generated.

  4. Streamline, Organizational, Legislative and Administrative Response to Permitting, PV Market Share, and Solar Energy Costs (Broward Go SOLAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halsey, Jeffery D.

    2013-08-28

    Broward County and its partners (the Go SOLAR Team), operating under a Department of Energy Rooftop Solar Challenge Agreement, designed, developed and implemented an online permitting system for rooftop solar PV systems. This is a single web based system with a single permit fee that will issue a permit, with a set of design plans preapproved by partner building officials, within one hour. The system is currently available at gosolar.broward.org for use within any of the partner Authorities Having [permitting] Jurisdiction (AHJ). Additionally, the Go SOLAR Team researched, developed and to the extent feasible, implemented three best management practices tomore » make a fertile environment for the new online permit system. These included Net Metering and Interconnection Standards, Solar-Friendly Financing, and Planning and Zoning Ordinances. Finally, the team implemented a substantial outreach effort to advocate for the development of solar in Broward County, with an emphasis on Solar Rights, concluding with a Go SOLAR Fest day and a half conference with over 1,200 attendees and 50 exhibitors. The Go SOLAR project was completed on time, under DOE’s budgeted amount, and all project objectives were met or exceeded.« less

  5. Environmental Assessment for the Solar Photovoltaic Array at Eglin Air Force Base, Florida

    DTIC Science & Technology

    2014-01-24

    design changes. The Proposed Action also includes construction of the solar PV system , construction of a perimeter fence, and routine site maintenance...Department of Environmental Protection (FDEP) National Pollutant Discharge Elimination System (NPDES) Permit ● Environmental Resource Permit...Management Actions Soils ● Describe slopes, drainage patterns, areas of soil disturbance, areas where stabilization practices will occur, water

  6. Estimating the discharge for ordinary high water levels in Kansas : [technical summary].

    DOT National Transportation Integrated Search

    2014-09-01

    The water resource design community in Kansas, including the Kansas Department : of Transportation (KDOT), is required to obtain appropriate permits for construction : projects. Projects that involve stream modification, including drainage structures...

  7. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  8. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  9. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  10. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  11. 23 CFR 656.5 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... carpool lanes. Eligible work may include preliminary engineering to determine traffic flow and design criteria, signing, pavement markings, traffic control devices, and minor physical modifications to permit... any existing or planned mass transportation service, but should be designed so that the facility could...

  12. 14 CFR 437.55 - Hazard analysis.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Safety Requirements § 437.55 Hazard analysis. (a) A permittee must...) Design inadequacies; or (vi) Procedural deficiencies. (2) Determine the likelihood of occurrence and... include one or more of the following: (i) Designing for minimum risk, (ii) Incorporating safety devices...

  13. 14 CFR 437.55 - Hazard analysis.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Safety Requirements § 437.55 Hazard analysis. (a) A permittee must...) Design inadequacies; or (vi) Procedural deficiencies. (2) Determine the likelihood of occurrence and... include one or more of the following: (i) Designing for minimum risk, (ii) Incorporating safety devices...

  14. 14 CFR 437.55 - Hazard analysis.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Safety Requirements § 437.55 Hazard analysis. (a) A permittee must...) Design inadequacies; or (vi) Procedural deficiencies. (2) Determine the likelihood of occurrence and... include one or more of the following: (i) Designing for minimum risk, (ii) Incorporating safety devices...

  15. 29 CFR 1910.303 - General.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.303..., including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus... from grounds other than those required or permitted by this subpart. (4) Interrupting rating. Equipment...

  16. 29 CFR 1910.303 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.303..., including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus... from grounds other than those required or permitted by this subpart. (4) Interrupting rating. Equipment...

  17. 29 CFR 1910.303 - General.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.303..., including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus... from grounds other than those required or permitted by this subpart. (4) Interrupting rating. Equipment...

  18. 29 CFR 1910.303 - General.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.303..., including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus... from grounds other than those required or permitted by this subpart. (4) Interrupting rating. Equipment...

  19. 29 CFR 1910.303 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.303..., including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus... from grounds other than those required or permitted by this subpart. (4) Interrupting rating. Equipment...

  20. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... prescribed in 49 CFR part 7, appendix D. (d) The HA shall accomplish sufficient preliminary design and... alternative shall be included with any proposal for a movable bridge to provide a comparative analysis of..., safety, environmental and navigational needs along with highway costs when designing a proposed navigable...

  1. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescribed in 49 CFR part 7, appendix D. (d) The HA shall accomplish sufficient preliminary design and... alternative shall be included with any proposal for a movable bridge to provide a comparative analysis of..., safety, environmental and navigational needs along with highway costs when designing a proposed navigable...

  2. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... prescribed in 49 CFR part 7, appendix D. (d) The HA shall accomplish sufficient preliminary design and... alternative shall be included with any proposal for a movable bridge to provide a comparative analysis of..., safety, environmental and navigational needs along with highway costs when designing a proposed navigable...

  3. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... prescribed in 49 CFR part 7, appendix D. (d) The HA shall accomplish sufficient preliminary design and... alternative shall be included with any proposal for a movable bridge to provide a comparative analysis of..., safety, environmental and navigational needs along with highway costs when designing a proposed navigable...

  4. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... prescribed in 49 CFR part 7, appendix D. (d) The HA shall accomplish sufficient preliminary design and... alternative shall be included with any proposal for a movable bridge to provide a comparative analysis of..., safety, environmental and navigational needs along with highway costs when designing a proposed navigable...

  5. An Evaluation Research Model for System-Wide Textbook Selection.

    ERIC Educational Resources Information Center

    Talmage, Harriet; Walberg, Herbert T.

    One component of an evaluation research model for system-wide selection of curriculum materials is reported: implementation of an evaluation design for obtaining data that permits professional and lay persons to base curriculum materials decisions on a "best fit" principle. The design includes teacher characteristics, learning environment…

  6. 40 CFR 68.215 - Permit content and air permitting authority or designated agency requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content and air permitting authority or designated agency requirements. 68.215 Section 68.215 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Other...

  7. 40 CFR 72.30 - Requirement to apply.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...

  8. 40 CFR 72.30 - Requirement to apply.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...

  9. 40 CFR 72.30 - Requirement to apply.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...

  10. 40 CFR 72.30 - Requirement to apply.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...

  11. 40 CFR 72.30 - Requirement to apply.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) PERMITS REGULATION Acid Rain Permit Applications § 72.30 Requirement to apply. (a) Duty to apply. The designated representative of any source with an affected unit shall submit a complete Acid Rain permit... permit that states its Acid Rain program requirements. (b) Deadlines—(1) Phase 1. (i) The designated...

  12. The NASA computer aided design and test system

    NASA Technical Reports Server (NTRS)

    Gould, J. M.; Juergensen, K.

    1973-01-01

    A family of computer programs facilitating the design, layout, evaluation, and testing of digital electronic circuitry is described. CADAT (computer aided design and test system) is intended for use by NASA and its contractors and is aimed predominantly at providing cost effective microelectronic subsystems based on custom designed metal oxide semiconductor (MOS) large scale integrated circuits (LSIC's). CADAT software can be easily adopted by installations with a wide variety of computer hardware configurations. Its structure permits ease of update to more powerful component programs and to newly emerging LSIC technologies. The components of the CADAT system are described stressing the interaction of programs rather than detail of coding or algorithms. The CADAT system provides computer aids to derive and document the design intent, includes powerful automatic layout software, permits detailed geometry checks and performance simulation based on mask data, and furnishes test pattern sequences for hardware testing.

  13. 14 CFR 437.85 - Allowable design changes; modification of an experimental permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...

  14. 14 CFR 437.85 - Allowable design changes; modification of an experimental permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...

  15. 14 CFR 437.85 - Allowable design changes; modification of an experimental permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...

  16. 14 CFR 437.85 - Allowable design changes; modification of an experimental permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...

  17. 14 CFR 437.85 - Allowable design changes; modification of an experimental permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Conditions of an Experimental Permit § 437.85 Allowable design changes; modification of an experimental... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Allowable design changes; modification of an experimental permit. 437.85 Section 437.85 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION...

  18. Implementation and flight-test of a multi-mode rotorcraft flight-control system for single-pilot use in poor visibility

    NASA Technical Reports Server (NTRS)

    Hindson, William S.

    1987-01-01

    A flight investigation was conducted to evaluate a multi-mode flight control system designed according to the most recent recommendations for handling qualities criteria for new military helicopters. The modes and capabilities that were included in the system are those considered necessary to permit divided-attention (single-pilot) lowspeed and hover operations near the ground in poor visibility conditions. Design features included mode-selection and mode-blending logic, the use of an automatic position-hold mode that employed precision measurements of aircraft position, and a hover display which permitted manually-controlled hover flight tasks in simulated instrument conditions. Pilot evaluations of the system were conducted using a multi-segment evaluation task. Pilot comments concerning the use of the system are provided, and flight-test data are presented to show system performance.

  19. 40 CFR 270.13 - Contents of part A of the permit application.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Permit..., and disposing of hazardous waste, and the design capacity of these items. (j) A specification of the hazardous wastes listed or designated under 40 CFR part 261 to be treated, stored, or disposed of at the...

  20. 40 CFR 270.13 - Contents of part A of the permit application.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Permit..., and disposing of hazardous waste, and the design capacity of these items. (j) A specification of the hazardous wastes listed or designated under 40 CFR part 261 to be treated, stored, or disposed of at the...

  1. PG&E WaveConnect Program Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brendan P. Dooher; Edward Cheslak; Robert Booth

    The PG&E WaveConnect project was intended to demonstrate the technical and economic viability of wave power in the open ocean adjacent to PG&E's service territory. WaveConnect was conceived as a multi-stage development process leading to long-term megawatt-scale wave power production. The first-stage tasks consisted of site selection, permitting, pilot plant design, and assessment of technology and commercial readiness. The second stage would have included development of infrastructure, undersea cabling, and deployment of wave energy conversion devices (WECs). In the third stage, the most promising WEC devices would have been deployed in larger quantities and connected to the grid. This reportmore » documents the findings of Stage One. Site Selection: After studying the wave energy potential, grid interconnection and other project infrastructure along the California coast, PG&E selected two sites: one near Eureka, called the Humboldt WaveConnect (HWC) project, and another near Vandenberg Air Force Base, called the Central Coast WaveConnect project (CCWC). Permitting: FERC issued PG&E preliminary permits for HWC in 2008 and for CCWC in 2010. PG&E chose to use FERC's Pilot Project Licensing Process, which was intended to streamline licensing to allow relatively quick and easy installation, operation, and environmental testing for pilot projects. Permitting, however, proved to be complicated, time-consuming and expensive, mainly because of the uncertain impacts of WEC devices. PG&E learned that even under the PPLP the project would still require a full analysis under CEQA, including an EIR, as well as Monitoring and Adaptive Management Programs and other requirements that had significant cost and scheduling implications. A majority of efforts were expended on permitting activities. Pilot Plant Design: PG&E prepared a conceptual design for a 5-MW pilot test facility at the Humboldt site, which consisted of an off-shore deployment area where WECs of different designs and from different device manufacturers could be tested. PG&E was to provide permitting, subsea cables, and on-shore facilities necessary to connect WaveConnect to an existing PG&E substation, while the WEC manufacturers would provide, operate and maintain their devices during the test period. Technology and Commercial Readiness: PG&E issued a Request for Information to the wave power industry to assess the technical and commercial capabilities of WEC manufacturers. Sixteen manufacturers responded, representing the four best-known and most mature designs. PG&E found that WECs are early-stage devices with evolving designs and little real-world operating experience. These characteristics made environmental impacts difficult to assess, which complicated permitting efforts. It also made a megawatt-scale demonstration project difficult to support because early stage WECs are costly and have limited track records for performance and reliability. Results: PG&E withdrew its FERC DPLA for HWC in November 2010 and surrendered its preliminary permit for CCWC in May 2011, effectively discontinuing the project for the following combination of reasons: Permitting issues were much more challenging than originally anticipated. Stage One project funding of $6 million proved insufficient to complete the necessary development and permitting work. During Stage One development, PG&E determined that permitting costs would be $2 million to $5 million greater than originally budgeted. The cost of developing a five-year, 5-MW pilot project at Humboldt Bay is much greater than the $15 million to $20 million originally estimated. Even assuming that vendors provide WEC devices at no cost to the utility, which was the proposed strategy with WaveConnect, PG&E concluded that a pilot project comparable to HWC would cost approximately $47 million. If WEC devices were purchased for such a project, its total cost would be on the order of $90 million. It is unclear when or if wave power will become competitive with renewable energy alternatives. Significant additional investment in design, testing and demonstration will be needed to improve designs and reduce costs. Using a vendor-provided installed cost goal of $2500/kW for mature WECs in five to 10 years, PG&E concluded that their LCOE would be in the range of $175-$250/MWh, which is not competitive with current or near-term renewable alternatives such as wind or solar photovoltaics. Although PG&E discontinued the project and no WEC devices were deployed, WaveConnect advanced PG&E's understanding of the technological, engineering, permitting, environmental, economic, stakeholder, and related issues involved in undertaking any wave power project now or in the future. As WEC technologies mature, and regulatory and permitting agencies grow more familiar with their environmental impacts, PG&E believes that wave power will merit further evaluation, demonstration and deployment.« less

  2. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To..., apply to construction permits and operating licenses subject to this appendix N. 2. Applications for...

  3. Design, characterization and control of the Unique Mobility Corporation robot

    NASA Technical Reports Server (NTRS)

    Velasco, Virgilio B., Jr.; Newman, Wyatt S.; Steinetz, Bruce; Kopf, Carlo; Malik, John

    1994-01-01

    Space and mass are at a premium on any space mission, and thus any machinery designed for space use should be lightweight and compact, without sacrificing strength. It is for this reason that NASA/LeRC contracted Unique Mobility Corporation to exploit their novel actuator designs to build a robot that would advance the present state of technology with respect to these requirements. Custom-designed motors are the key feature of this robot. They are compact, high-performance dc brushless servo motors with a high pole count and low inductance, thus permitting high torque generation and rapid phase commutation. Using a custom-designed digital signal processor-based controller board, the pulse width modulation power amplifiers regulate the fast dynamics of the motor currents. In addition, the programmable digital signal processor (DSP) controller permits implementation of nonlinear compensation algorithms to account for motoring vs. regeneration, torque ripple, and back-EMF. As a result, the motors produce a high torque relative to their size and weight, and can do so with good torque regulation and acceptably high velocity saturation limits. This paper presents the Unique Mobility Corporation robot prototype: its actuators, its kinematic design, its control system, and its experimental characterization. Performance results, including saturation torques, saturation velocities and tracking accuracy tests are included.

  4. 40 CFR 123.35 - As the NPDES Permitting Authority for regulated small MS4s, what is my role?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... management programs, TMDL programs, and water quality monitoring programs; (v) Where appropriate, you may... storm water discharge results in or has the potential to result in exceedances of water quality standards, including impairment of designated uses, or other significant water quality impacts, including...

  5. 40 CFR 123.35 - As the NPDES Permitting Authority for regulated small MS4s, what is my role?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management programs, TMDL programs, and water quality monitoring programs; (v) Where appropriate, you may... storm water discharge results in or has the potential to result in exceedances of water quality standards, including impairment of designated uses, or other significant water quality impacts, including...

  6. Operating instructions, Diborane shipping container DOT special permit no. 6522, volume 3

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A manual is presented to provide instructions and information for safe and efficient use of the 200-pound diborane shipping container. The scope of the manual includes: shipping, receiving, storage, unloading, return, cleanout, and loading. Backup information on container design and performance, diborane information, etc., are also included.

  7. 37 CFR 1.152 - Design drawings.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design patent...

  8. 37 CFR 1.152 - Design drawings.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... are not permitted in a design drawing. Photographs and ink drawings are not permitted to be combined as formal drawings in one application. Photographs submitted in lieu of ink drawings in design patent...

  9. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  10. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  11. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  12. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  13. 33 CFR 126.25 - Penalties for handling designated dangerous cargo without permit.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... dangerous cargo without permit. 126.25 Section 126.25 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.25 Penalties for handling designated dangerous cargo without permit. Handling, loading...

  14. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  15. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States

    DOE PAGES

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; ...

    2017-04-26

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain majormore » source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called 'major' or 'minor') has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Finally, our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.« less

  16. Potential Air Pollutant Emissions and Permitting Classifications for Two Biorefinery Process Designs in the United States.

    PubMed

    Eberle, Annika; Bhatt, Arpit; Zhang, Yimin; Heath, Garvin

    2017-06-06

    Advanced biofuel production facilities (biorefineries), such as those envisioned by the United States (U.S.) Renewable Fuel Standard and U.S. Department of Energy's research and development programs, often lack historical air pollutant emissions data, which can pose challenges for obtaining air emission permits that are required for construction and operation. To help fill this knowledge gap, we perform a thorough regulatory analysis and use engineering process designs to assess the applicability of federal air regulations and quantify air pollutant emissions for two feasibility-level biorefinery designs. We find that without additional emission-control technologies both biorefineries would likely be required to obtain major source permits under the Clean Air Act's New Source Review program. The permitting classification (so-called "major" or "minor") has implications for the time and effort required for permitting and therefore affects the cost of capital and the fuel selling price. Consequently, we explore additional technically feasible emission-control technologies and process modifications that have the potential to reduce emissions to achieve a minor source permitting classification. Our analysis of air pollutant emissions and controls can assist biorefinery developers with the air permitting process and inform regulatory agencies about potential permitting pathways for novel biorefinery designs.

  17. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  18. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  19. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  20. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described... (BMPs) are generally the most appropriate form of effluent limitations when designed to satisfy...

  1. Laser or charged-particle-beam fusion reactor with direct electric generation by magnetic flux compression

    DOEpatents

    Lasche, G.P.

    1983-09-29

    The invention is a laser or particle-beam-driven fusion reactor system which takes maximum advantage of both the very short pulsed nature of the energy release of inertial confinement fusion (ICF) and the very small volumes within which the thermonuclear burn takes place. The pulsed nature of ICF permits dynamic direct energy conversion schemes such as magnetohydrodynamic (MHD) generation and magnetic flux compression; the small volumes permit very compact blanket geometries. By fully exploiting these characteristics of ICF, it is possible to design a fusion reactor with exceptionally high power density, high net electric efficiency, and low neutron-induced radioactivity. The invention includes a compact blanket design and method and apparatus for obtaining energy utilizing the compact blanket.

  2. Quiet Clean Short-haul Experimental Engine (QCSEE): The aerodynamic and mechanical design of the QCSEE under-the-wing fan

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The design, fabrication, and testing of two experimental high bypass geared turbofan engines and propulsion systems for short haul passenger aircraft are described. The aerodynamic and mechanical design of a variable pitch 1.34 pressure ratio fan for the under the wing (UTW) engine are included. The UTW fan was designed to permit rotation of the 18 composite fan blades into the reverse thrust mode of operation through both flat pitch and stall pitch directions.

  3. Water Quality Trading Toolkit for Permit Writers

    EPA Pesticide Factsheets

    The Water Quality Trading Toolkit for Permit Writers is EPA’s first “how-to” manual on designing and implementing water quality trading programs. It helps NPDES permitting authorities incorporate trading provisions into permits.

  4. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    PubMed

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  5. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less

  6. A high-speed digital signal processor for atmospheric radar, part 7.3A

    NASA Technical Reports Server (NTRS)

    Brosnahan, J. W.; Woodard, D. M.

    1984-01-01

    The Model SP-320 device is a monolithic realization of a complex general purpose signal processor, incorporating such features as a 32-bit ALU, a 16-bit x 16-bit combinatorial multiplier, and a 16-bit barrel shifter. The SP-320 is designed to operate as a slave processor to a host general purpose computer in applications such as coherent integration of a radar return signal in multiple ranges, or dedicated FFT processing. Presently available is an I/O module conforming to the Intel Multichannel interface standard; other I/O modules will be designed to meet specific user requirements. The main processor board includes input and output FIFO (First In First Out) memories, both with depths of 4096 W, to permit asynchronous operation between the source of data and the host computer. This design permits burst data rates in excess of 5 MW/s.

  7. A Total Information Management System For All Medical Images

    NASA Astrophysics Data System (ADS)

    Ouimette, Donald; Nudelman, Sol; Ramsby, Gale; Spackman, Thomas

    1985-09-01

    A PACS has been designed for the University of Connecticut Health Center to serve all departments acquiring images for diagnosis, surgery and therapy. It incorporates a multiple community communications architecture to provide complete information management for medical images, medical data and departmental administrative matter. The system is modular and expandable. It permits an initial installation for radiology and subsequent expansion to include other departments at the Health Center, beginning with internal medicine, surgery, ophthalmology and dentistry. The design permits sufficient expansion to offer the potential for accepting the additional burden of a hospital information system. Primary parameters that led to this system design were based on the anticipation that departments in time could achieve generating 60 to 90% of their images suited to insertion in a PACS, that a high network throughput for large block image transfers would be essen-tial and that total system reliability was fundamental to success.

  8. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  9. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  10. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  11. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  12. 33 CFR 126.17 - Permits required for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.17 Section 126.17 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.17 Permits required for handling designated dangerous cargo. Designated dangerous cargo may be...

  13. 10 CFR 50.30 - Filing of application; oath or affirmation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operate, or manufacture, a production or utilization facility (including an early site permit, combined.... (e) Filing Fees. Each application for a standard design approval or production or utilization... 50.30 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION...

  14. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction.... (iii) A detailed description of sampling and monitoring procedures, including sampling and monitoring locations in the system, the equipment to be used, sampling and monitoring frequency, and planned analytical...

  15. A computer program for the design and analysis of low-speed airfoils, supplement

    NASA Technical Reports Server (NTRS)

    Eppler, R.; Somers, D. M.

    1980-01-01

    Three new options were incorporated into an existing computer program for the design and analysis of low speed airfoils. These options permit the analysis of airfoils having variable chord (variable geometry), a boundary layer displacement iteration, and the analysis of the effect of single roughness elements. All three options are described in detail and are included in the FORTRAN IV computer program.

  16. NPDES (National Pollution Discharge & Elimination System) Minor Dischargers

    EPA Pesticide Factsheets

    As authorized by the Clean Water Act, the National Pollutant Discharge Elimination System (NPDES) permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States. The NPDES permit program regulates direct discharges from municipal and industrial wastewater treatment facilities that discharge directly into surface waters. The NPDES permit program is part of the Permit Compliance System (PCS) which issues, records, tracks, and regulates point source discharge facilities. Individual homes that are connected to a municipal system, use a septic system, or do not have a surface discharge do not need an NPDES permit. Facilities in PCS are identified as either major or minor. Within the major/minor classification, facilities are grouped into municipals or non-municipals. In many cases, non-municipals are industrial facilities. This data layer contains Minor dischargers. Major municipal dischargers include all facilities with design flows of greater than one million gallons per day; minor dischargers are less that one million gallons per day. Essentially, a minor discharger does not meet the discharge criteria for a major. Since its introduction in 1972, the NPDES permit program is responsible for significant improvements to our Nation's water quality.

  17. Topology Synthesis of Structures Using Parameter Relaxation and Geometric Refinement

    NASA Technical Reports Server (NTRS)

    Hull, P. V.; Tinker, M. L.

    2007-01-01

    Typically, structural topology optimization problems undergo relaxation of certain design parameters to allow the existence of intermediate variable optimum topologies. Relaxation permits the use of a variety of gradient-based search techniques and has been shown to guarantee the existence of optimal solutions and eliminate mesh dependencies. This Technical Publication (TP) will demonstrate the application of relaxation to a control point discretization of the design workspace for the structural topology optimization process. The control point parameterization with subdivision has been offered as an alternative to the traditional method of discretized finite element design domain. The principle of relaxation demonstrates the increased utility of the control point parameterization. One of the significant results of the relaxation process offered in this TP is that direct manufacturability of the optimized design will be maintained without the need for designer intervention or translation. In addition, it will be shown that relaxation of certain parameters may extend the range of problems that can be addressed; e.g., in permitting limited out-of-plane motion to be included in a path generation problem.

  18. 40 CFR 172.26 - EPA review of permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 24 2014-07-01 2014-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...

  19. 40 CFR 172.26 - EPA review of permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 25 2012-07-01 2012-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...

  20. 40 CFR 172.26 - EPA review of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...

  1. 40 CFR 172.26 - EPA review of permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 25 2013-07-01 2013-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...

  2. 40 CFR 172.26 - EPA review of permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 24 2011-07-01 2011-07-01 false EPA review of permits. 172.26 Section... EXPERIMENTAL USE PERMITS State Issuance of Experimental Use Permits § 172.26 EPA review of permits. (a... designated State agency shall notifiy EPA of the action by forwarding to the appropriate EPA Regional Office...

  3. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  4. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  5. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  6. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  7. 43 CFR 420.24 - Permits for organized events.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Permits for organized events. 420.24..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.24 Permits for organized events. Regional Directors may issue permits for the operation of off-road vehicles in organized...

  8. LANDSAT/MMS propulsion module design. Tas4.4: Concept design

    NASA Technical Reports Server (NTRS)

    Mansfield, J. M.; Etheridge, F. G.; Indrikis, J.

    1976-01-01

    Evaluations are presented of alternative LANDSAT follow-on launch configurations to derive the propulsion requirements for the multimission modular spacecraft (MMS). Two basic types were analyzed including use of conventional launch vehicles and shuttle supported missions. It was concluded that two sizes of modular hydrazine propulsion modules would provide the most cost-effective combination for future missions of this spacecraft. Conceptual designs of the selected propulsion modules were performed to the depth permitting determination of mass properties and estimated costs.

  9. 16 CFR 1025.33 - Production of documents and things.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 1025.33 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION GENERAL RULES OF PRACTICE FOR... (including writings, drawings, graphs, charts, photographs, phono-records, and any other data compilation..., custody, or control of the party upon whom the request is served, or (2) To permit entry upon designated...

  10. 40 CFR 172.25 - Administration of State programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sufficient information, including a confidential statement of formula for any new product, to enable the... and this subpart. (c) Labeling. (1) New products shall bear labeling satisfying the requirements of... distributed with the product. (2) The designated State agency may permit an EPA or State registered pesticide...

  11. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  12. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  13. 21 CFR 110.20 - Plant and grounds.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... filth, or providing a breeding place for pests. (4) Operating systems for waste treatment and disposal... controls and operating practices or effective design, including the separation of operations in which..., enclosed systems, or other effective means. (3) Permit the taking of proper precautions to protect food in...

  14. Commonwealth of Pennsylvania. [Establishment of hazardous waste facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Environmental Resources Secretary Arthur A. Davis and Commerce Secretary Raymond R. Christman have announced a joint initiative to establish commercial hazardous waste treatment and disposal facilities Pennsylvania. The state Hazardous Sites Cleanup Act, which Gov. Robert P. Casey signed into law last October, called for accelerated efforts in this regard. These included an expedited permitting process for facilities, requiring the Department of Environmental Resources (DER) to appoint a special sitting team to review permit applications, and designation of sitting coordinator within the Department of Commerce to identify potential developers of the facilities and encourage them to operate within Pennsylvania.

  15. Airborne interferometer for atmospheric emission and solar absorption.

    PubMed

    Keith, D W; Dykema, J A; Hu, H; Lapson, L; Anderson, J G

    2001-10-20

    The interferometer for emission and solar absorption (INTESA) is an infrared spectrometer designed to study radiative transfer in the troposphere and lower stratosphere from a NASA ER-2 aircraft. The Fourier-transform spectrometer (FTS) operates from 0.7 to 50 mum with a resolution of 0.7 cm(-1). The FTS observes atmospheric thermal emission from multiple angles above and below the aircraft. A heliostat permits measurement of solar absorption spectra. INTESA's calibration system includes three blackbodies to permit in-flight assessment of radiometric error. Results suggest that the in-flight radiometric accuracy is ~0.5 K in the mid-infrared.

  16. 78 FR 72968 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing of Proposed Rule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... Capital Commitment Schedule (``CCS'') interest; (3) NYSE Rule 70.25 to permit d-Quotes to be designated... that MPL Orders may interact with CCS interest; (3) NYSE Rule 70.25 to permit d- Quotes to be... the CCS pursuant to Rule 1000 would not be permitted to be designated as MPL Orders. The CCS is a...

  17. Design of multifunctional nanoparticles for combined in-vivo imaging and advanced drug delivery

    NASA Astrophysics Data System (ADS)

    Leary, James F.

    2018-02-01

    Design of multifunctional nanoparticles for multimodal in-vivo imaging and advanced targeting to diseased single cells for massive parallel processing nanomedicine approaches requires careful overall design and a multilayered approach. Initial core materials can include non-toxic metals which not only serve as an x-ray contrast agent for CAT scan imaging, but can contain T1 or T2 contrast agents for MRI imaging. One choice is superparamagnetic iron oxide NPs which also allow for convenient magnetic manipulation during manufacturing but also for re-positioning inside the body and for single cell hyperthermia therapies. To permit real-time fluorescence-guided surgery, fluorescence molecules can be included. Advanced targeting can be achieved by attaching antibodies, peptides, aptamers, or other targeting molecules to the nanoparticle in a multilayered approach producing "programmable nanoparticles" whereby the "programming" means controlling a sequence of multi-step targeting methods. Addition of membrane permeating peptides can facilitate uptake by the cell. Addition of "stealth" molecules (e.g. PEG or chitosan) to the outer surfaces of the nanoparticles can permit greatly enhanced circulation times in-vivo which in turn lead to lower amounts of drug exposure to the patient which can reduce undesirable side effects. Nanoparticles with incomplete layers can be removed by affinity purification methods to minimize mistargeting events in-vivo. Nanoscale imaging of these manufactured, multifunctional nanoparticles can be achieved either directly through superresolution microscopy or indirectly through single nanoparticle zeta-sizing or x-ray correlation microscopy. Since these multifunctional nanoparticles are best analyzed by technologies permitting analysis in aqueous environments, superresolution microscopy is, in most cases, the preferred method.

  18. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  19. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  20. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  1. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  2. 33 CFR 126.19 - Issuance of permits for handling designated dangerous cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designated dangerous cargo. 126.19 Section 126.19 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) WATERFRONT FACILITIES HANDLING OF DANGEROUS CARGO AT WATERFRONT FACILITIES § 126.19 Issuance of permits for handling designated dangerous cargo. Upon the application of the owners...

  3. 75 FR 48672 - Pesticides; Revised Fee Schedule for Registration Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... follows B772 118 Amend or extend Experimental 3 11,577 Use Permit; minor changes to experimental design...,942 Experimental Use Permit; minor changes to experimental design; extend established temporary... revision of experimental design B780 121 New active ingredient; non- 12 144,704 food/feed; no SAP review...

  4. The forces and moments on airplane engine mounts

    NASA Technical Reports Server (NTRS)

    Donely, Philip

    1936-01-01

    A resume of the equations and formulas for the forces and moments on an aircraft-engine mount is presented. In addition, available experimental data have been included to permit the computation of these forces and moments. A sample calculation is made and compared with present design conditions for engine mounts.

  5. 34 CFR 395.3 - Application for designation as State licensing agency; content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... agency to the vendors, including their selection, duties, supervision, transfer, promotion, financial..., and take adequate steps to assure that each vendor understands the provisions of the permit and any agreement under which he operates, as evidenced by his signed statements: (vii) Submit to an arbitration...

  6. 50 CFR 635.71 - Prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... permit, display permit, chartering permit, or shark research permit on board the vessel, as specified in... HMS. (36) Fish with bottom or pelagic longline and shark gillnet gear for HMS without adhering to the... the number designated by NMFS, the incidental capture of listed whales with shark gillnet gear as...

  7. Collaborative Mission Design at NASA Langley Research Center

    NASA Technical Reports Server (NTRS)

    Gough, Kerry M.; Allen, B. Danette; Amundsen, Ruth M.

    2005-01-01

    NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

  8. 77 FR 6112 - Notice of Final National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... Elimination System (NPDES) General Permit for Discharges From Concentrated Animal Feeding Operations (CAFOs... permit for discharges from eligible owners/operators of concentrated animal feeding operations (CAFOs... of the final permit, animal feeding operations that are defined as CAFOs or designated as CAFOs by...

  9. Lean in Air Permitting Guide

    EPA Pesticide Factsheets

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  10. 78 FR 65388 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-31

    ...: Whenever applications are made for early site permits (ESPs), standard design certifications (SDCs). 6. Who... standard NPP designs, and licenses which combine in a single license a construction permit, and an... information collected to assess the adequacy and suitability of an applicant's site, plant design...

  11. Interplanetary spacecraft design using solar electric propulsion

    NASA Technical Reports Server (NTRS)

    Duxbury, J. H.; Paul, G. M.

    1974-01-01

    Emphasis of the electric propulsion technology program is now on the application of solar electric propulsion to scientific missions. Candidate planetary, cometary, and geosynchronous missions are being studied. The object of this paper is to describe a basic spacecraft design proposed as the means to accomplish (1) a comet Encke slow flyby, (2) a comet Encke rendezvous, and (3) an out-of-the-ecliptic mission. The discussion includes design differences foreseen for the various missions and indicates those areas where spacecraft design commonality is possible. Particular emphasis is placed on a solar electric propulsion module design which permits an attractive degree of design inheritance from mission to mission.

  12. Characterization and design of the FutureGen 2.0 carbon storage site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilmore, Tyler; Bonneville, Alain; Sullivan, Charlotte

    2016-10-01

    The objective of the FutureGen 2.0 Project was to demonstrate, at the commercial scale, the technical feasibility of implementing carbon capture and storage (CCS) in a deep saline formation in Illinois, USA. Over approximately 5 years, the FutureGen Alliance conducted a detailed site-selection process and identified a site for carbon sequestration storage in Morgan County, Illinois. The storage site was fully characterized, including the collection of seismic data and the drilling and characterization of a stratigraphic borehole. The characterization data provided critical input for developing a site-specific conceptual model and subsequent numerical modeling simulations. The modeling simulations, coupled with themore » upstream designs of the pipeline and power plant supported the development of a detailed 90 percent design that included the injection wells and associated control and monitoring infrastructure. Collectively, all these data were used by the FutureGen Alliance to develop the required documentation to support the applications for four underground injection control (UIC) permits (one for each proposed well). In August 2014, the U.S. Environmental Protection Agency issued four, first-of-their-kind, Class VI UIC permits for carbon sequestration in the United States to the FutureGen Alliance. The information and data generated under this project have been made publically available through reports and publications, including this journal and others.« less

  13. 40 CFR 60.4121 - Submission of Hg budget permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Submission of Hg budget permit... Times for Coal-Fired Electric Steam Generating Units Permits § 60.4121 Submission of Hg budget permit applications. (a) Duty to apply. The Hg designated representative of any Hg Budget source required to have a...

  14. NPDES Permit for Riverview Estates Wastewater Treatment Facility in North Dakota

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number ND-0031143, the Riverview Estates Wastewater Treatment Facility is authorized to discharge from its wastewater treatment facility in designated locations as described in the permit.

  15. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  16. FORTRAN program for calculating total efficiency - specific speed characteristics of centrifugal compressors

    NASA Technical Reports Server (NTRS)

    Galvas, M. R.

    1972-01-01

    A computer program for predicting design point specific speed - efficiency characteristics of centrifugal compressors is presented with instructions for its use. The method permits rapid selection of compressor geometry that yields maximum total efficiency for a particular application. A numerical example is included to demonstrate the selection procedure.

  17. 78 FR 20393 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... by the general public.'' This charge is designed ``to recover the full cost to the Federal Government... general public. In keeping with Federal cost recovery policy, we are only proposing fees for those... based on the employees' salaries and benefits. The cost of travel includes travel associated with field...

  18. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  19. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  20. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  1. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  2. 49 CFR 238.407 - Anti-climbing mechanism.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... power car constructed with a crash energy management design is permitted to crush in a controlled manner... Equipment § 238.407 Anti-climbing mechanism. (a) Each power car shall have an anti-climbing mechanism at its..., including between units of articulated cars or other permanently joined units of cars, shall have an anti...

  3. 40 CFR 125.98 - As the Director, what must I do to comply with the requirements of this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... technologies, operational measures, or restoration measures should be included in the permit to meet the... evaluate the performance of the design and construction technologies, operational measures, and/or... construction technologies, operational measure, and/or restoration measures, and/or improved operation and...

  4. CNN Newsroom Classroom Guides, November 1-30, 1997.

    ERIC Educational Resources Information Center

    Cable News Network, Atlanta, GA.

    These classroom guides, designed to accompany the daily CNN (Cable News Network) Newsroom broadcasts for the month of November 1997, provide program rundowns, suggestions for class activities and discussion, student handouts, and a list of related news terms. Topics include: U.S. leaders call for the use of force as Iraq refuses to permit access…

  5. Low Noise Research Fan Stage Design

    NASA Technical Reports Server (NTRS)

    Hobbs, David E.; Neubert, Robert J.; Malmborg, Eric W.; Philbrick, Daniel H.; Spear, David A.

    1995-01-01

    This report describes the design of a Low Noise ADP Research Fan stage. The fan is a variable pitch design which is designed at the cruise pitch condition. Relative to the cruise setting, the blade is closed at takeoff and opened for reverse thrust operation. The fan stage is a split flow design with fan exit guide vanes and core stators. This fan stage design was combined with a nacelle and engine core duct to form a powered fan/nacelle, subscale model. This model is intended for use in aerodynamic performance, acoustic and structural testing in a wind tunnel. The model has a 22-inch outer fan diameter and a hub-to-top ratio of 0.426 which permits the use of existing NASA fan and cowl force balance designs and rig drive system. The design parameters were selected to permit valid acoustic and aerodynamic comparisons with the PW 17-inch rig previously tested under NASA contract. The fan stage design is described in detail. The results of the design axisymmetric analysis at aerodynamic design condition are included. The structural analysis of the fan rotor and attachment is described including the material selections and stress analysis. The blade and attachment are predicted to have adequate low cycle fatigue life, and an acceptable operating range without resonant stress or flutter. The stage was acoustically designed with airfoil counts in the fan exit guide vane and core stator to minimize noise. A fan-FEGV tone analysis developed separately under NASA contract was used to determine these airfoil counts. The fan stage design was matched to a nacelle design to form a fan/nacelle model for wind tunnel testing. The nacelle design was developed under a separate NASA contract. The nacelle was designed with an axisymmetric inlet, cowl and nozzle for convenience in testing and fabrication. Aerodynamic analysis of the nacelle confirmed the required performance at various aircraft operating conditions.

  6. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 5 2013-07-01 2013-07-01 false Requests for amendments or extensions of active permits. 767.8 Section 767.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  7. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 5 2012-07-01 2012-07-01 false Requests for amendments or extensions of active permits. 767.8 Section 767.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  8. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 5 2014-07-01 2014-07-01 false Requests for amendments or extensions of active permits. 767.8 Section 767.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  9. 32 CFR 767.8 - Requests for amendments or extensions of active permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Requests for amendments or extensions of active permits. 767.8 Section 767.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY... extensions of active permits. (a) Requests for amendments to active permits (e.g., a change in study design...

  10. 43 CFR 13.2 - Application for permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Application for permit. 13.2 Section 13.2... PERSONS § 13.2 Application for permit. (a) State licensing agencies designated by the Department of Health... the reasons on which it is based. The fact that a permit will be without charge for rent shall not...

  11. 50 CFR 32.70 - Wyoming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or across refuge roads and parking areas is not permitted. D. Sport Fishing. Anglers may sport fish... permitted on designated areas of the refuge. D. Sport Fishing. [Reserved] Seedskadee National Wildlife..., jackrabbit, raccoon, fox, and skunk on designated areas of the refuge in accordance with State regulations...

  12. Groundwater monitoring of hydraulic fracturing in California: Recommendations for permit-required monitoring

    NASA Astrophysics Data System (ADS)

    Esser, B. K.; Beller, H. R.; Carroll, S.; Cherry, J. A.; Jackson, R. B.; Jordan, P. D.; Madrid, V.; Morris, J.; Parker, B. L.; Stringfellow, W. T.; Varadharajan, C.; Vengosh, A.

    2015-12-01

    California recently passed legislation mandating dedicated groundwater quality monitoring for new well stimulation operations. The authors provided the State with expert advice on the design of such monitoring networks. Factors that must be considered in designing a new and unique groundwater monitoring program include: Program design: The design of a monitoring program is contingent on its purpose, which can range from detection of individual well leakage to demonstration of regional impact. The regulatory goals for permit-required monitoring conducted by operators on a well-by-well basis will differ from the scientific goals of a regional monitoring program conducted by the State. Vulnerability assessment: Identifying factors that increase the probability of transport of fluids from the hydrocarbon target zone to a protected groundwater zone enables the intensity of permit-required monitoring to be tiered by risk and also enables prioritization of regional monitoring of groundwater basins based on vulnerability. Risk factors include well integrity; proximity to existing wellbores and geologic features; wastewater disposal; vertical separation between the hydrocarbon and groundwater zones; and site-specific hydrogeology. Analyte choice: The choice of chemical analytes in a regulatory monitoring program is guided by the goals of detecting impact, assuring public safety, preventing resource degradation, and minimizing cost. Balancing these goals may be best served by tiered approach in which targeted analysis of specific chemical additives is triggered by significant changes in relevant but more easily analyzed constituents. Such an approach requires characterization of baseline conditions, especially in areas with long histories of oil and gas development. Monitoring technology: Monitoring a deep subsurface process or a long wellbore is more challenging than monitoring a surface industrial source. The requirement for monitoring multiple groundwater aquifers across a range of depths and of monitoring at deeper depths than is typical for regulatory monitoring programs requires consideration of monitoring technology, which can range from clusters of wells to multiple wells in a single wellbore to multi-level systems in a single cased wellbore.

  13. 10 CFR 50.37 - Agreement limiting access to Classified Information.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...

  14. NPDES Permits for Phase 2 Stormwater Program in Puerto Rico

    EPA Pesticide Factsheets

    EPA's 1999 stormwater Phase II regulations established small municipal separate storm sewer systems (MS4s) in urbanized areas, and small MS4s outside the urbanized areas that are designated by the permitting authority, to obtain NPDES permit coverage.

  15. Design strategies for the International Space University's variable gravity research facility

    NASA Technical Reports Server (NTRS)

    Bailey, Sheila G.; Chiaramonte, Francis P.; Davidian, Kenneth J.

    1990-01-01

    A variable gravity research facility named 'Newton' was designed by 58 students from 13 countries at the International Space University's 1989 summer session at the Universite Louis Pasteur, Strasbourge, France. The project was comprehensive in scope, including a political and legal foundation for international cooperation, development and financing; technical, science and engineering issues; architectural design; plausible schedules; and operations, crew issues and maintenance. Since log-term exposure to zero gravity is known to be harmful to the human body, the main goal was to design a unique variable gravity research facility which would find a practical solution to this problem, permitting a manned mission to Mars. The facility would not duplicate other space-based facilities and would provide the flexibility for examining a number of gravity levels, including lunar and Martian gravities. Major design alternatives included a truss versus a tether based system which also involved the question of docking while spinning or despinning to dock. These design issues are described. The relative advantages or disadvantages are discussed, including comments on the necessary research and technology development required for each.

  16. High-freezing-point fuel studies

    NASA Technical Reports Server (NTRS)

    Tolle, F. F.

    1980-01-01

    Considerable progress in developing the experimental and analytical techniques needed to design airplanes to accommodate fuels with less stringent low temperature specifications is reported. A computer technique for calculating fuel temperature profiles in full tanks was developed. The computer program is being extended to include the case of partially empty tanks. Ultimately, the completed package is to be incorporated into an aircraft fuel tank thermal analyser code to permit the designer to fly various thermal exposure patterns, study fuel temperatures versus time, and determine holdup.

  17. National Dam Safety Program. Stony Brook Watershed Dam Site Number 7 (NJ00344), Raritan River Basin, Stony Brook, Mercer County, New Jersey. Phase 1 Inspection Report.

    DTIC Science & Technology

    1980-02-01

    for Permit for Construction and Repair of Dam" filed on March 16, 1959. f. Design and Construction History Design data on file with NJDEP include: 1...LAr- Us a-2. hr’s. LA9~ WATF=R? SiQ_~~- SL- !E q VOL ( YFv - mcA>-) (Acmr-- =T.) 2o4~ 2-Ito STORCH ENGINEERS shootL... of 11. Project FmnnK Wmr=X---A-1

  18. Performance of portland limestone cements : cements designed to be more sustainable that include up to 15% limestone addition.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2009, ASTM and AASHTO permitted the use of up to 5% interground limestone in ordinary portland cement (OPC) as a part of ASTM : C150/AASHTO M85. When this project was initiated a new proposal was being discussed that would enable up to 15% intergr...

  19. EZLP: An Interactive Computer Program for Solving Linear Programming Problems. Final Report.

    ERIC Educational Resources Information Center

    Jarvis, John J.; And Others

    Designed for student use in solving linear programming problems, the interactive computer program described (EZLP) permits the student to input the linear programming model in exactly the same manner in which it would be written on paper. This report includes a brief review of the development of EZLP; narrative descriptions of program features,…

  20. A SURVEY OF PARKING LOT UTILIZATION AT THE SOUTH CAMPUS, MACOMB COUNTY COMMUNITY COLLEGE.

    ERIC Educational Resources Information Center

    Macomb County Community Coll., Warren, MI.

    COLLEGE PARKING FACILITIES SHOULD (1) PERMIT FREE MOVEMENT OF VEHICLES, (2) ACCOMMODATE PEAK HOUR TRAFFIC DEMANDS, INCLUDING PROVISION OF RESERVOIR SPACE AT ENTRANCES AND EXITS, (3) BE ADEQUATELY MARKED AND POSTED, (4) BE DESIGNED TO ALLOW INTERNAL MOVEMENT, EASE AND SAFETY OF ACCESS, ADEQUATE MANEUVERING AREAS, AND GENERAL CONVENIENCE, AND (5) BE…

  1. In situ gas treatment technology demonstration test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thornton, E.C.; Miller, R.D.

    1996-02-16

    This document defines the objectives and requirements associated with undertaking a field demonstration of an in situ gas treatment appoach to remediation chromate-contaminated soil. The major tasks presented in this plan include the design and development of the surface gas treatment system, performance of permitting activities, and completion of site preparation and field testing activities.

  2. 33 CFR 325.5 - Forms of permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) DA permits under this regulation will be in the form of individual permits or general permits. The basic format shall be ENG Form 1721, DA Permit (Appendix A). (2) The general conditions included in ENG... be required. (2) Nationwide permits. Nationwide permits are a type of general permit and represent DA...

  3. 14 CFR 437.95 - Inspection of additional reusable suborbital rockets.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.95 Inspection of additional reusable suborbital rockets. A permittee may launch or reenter additional reusable suborbital rockets of the same design under the permit after...

  4. 14 CFR 437.95 - Inspection of additional reusable suborbital rockets.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.95 Inspection of additional reusable suborbital rockets. A permittee may launch or reenter additional reusable suborbital rockets of the same design under the permit after...

  5. 14 CFR 437.95 - Inspection of additional reusable suborbital rockets.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.95 Inspection of additional reusable suborbital rockets. A permittee may launch or reenter additional reusable suborbital rockets of the same design under the permit after...

  6. 14 CFR 437.95 - Inspection of additional reusable suborbital rockets.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.95 Inspection of additional reusable suborbital rockets. A permittee may launch or reenter additional reusable suborbital rockets of the same design under the permit after...

  7. 14 CFR 437.95 - Inspection of additional reusable suborbital rockets.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION LICENSING EXPERIMENTAL PERMITS Terms and Conditions of an Experimental Permit § 437.95 Inspection of additional reusable suborbital rockets. A permittee may launch or reenter additional reusable suborbital rockets of the same design under the permit after...

  8. Mariner Venus Mercury, 1973. [close flyby investigation of mercury after Venus-flyby, and observation of Kohoutek comet

    NASA Technical Reports Server (NTRS)

    Wilson, J. H.

    1973-01-01

    The Mariner Venus Mercury 1973 unmanned mission is discussed, which is designed to conduct a close flyby investigation of the planet Mercury after using the gravity-turn technique in a Venus flyby. Its scientific purposes include photographic, thermal, and spectral surveys, radio occulation, and charged particle/magnetic measurements at each planet, observation of solar-system fields and particles from 1.0 a.u. down to 0.4 a.u., and comparative planetary surveys between the Earth, the Moon, Venus, and Mercury. It is also intended to observe Kohoutek's comet. The trajectory permits establishment of a solar orbit in phase with Mercury's, permitting repeated encounters with that planet.

  9. Life sciences payload definition and integration study. Volume 1: Executive summary. [carry-on laboratory for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The definition and integration tasks involved in the development of design concepts for a carry-on laboratory (COL), to be compatible with Spacelab operations, were divided into the following study areas: (1) identification of research and equipment requirements of the COL; (2) development of a number of conceptual layouts for COL based on the defined research of final conceptual designs; and (4) development of COL planning information for definition of COL/Spacelab interface data, cost data, and program cost schedules, including design drawings of a selected COL to permit fabrication of a functional breadboard.

  10. Solar cell array design handbook, volume 1

    NASA Technical Reports Server (NTRS)

    Rauschenbach, H. S.

    1976-01-01

    Twelve chapters discuss the following: historical developments, the environment and its effects, solar cells, solar cell filters and covers, solar cell and other electrical interconnections, blocking and shunt diodes, substrates and deployment mechanisms, material properties, design synthesis and optimization, design analysis, procurement, production and cost aspects, evaluation and test, orbital performance, and illustrative design examples. A comprehensive index permits rapid locating of desired topics. The handbook consists of two volumes: Volume 1 is of an expository nature while Volume 2 contains detailed design data in an appendix-like fashion. Volume 2 includes solar cell performance data, applicable unit conversion factors and physical constants, and mechanical, electrical, thermal optical, magnetic, and outgassing material properties. Extensive references are provided.

  11. Advanced space system analysis software. Technical, user, and programmer guide

    NASA Technical Reports Server (NTRS)

    Farrell, C. E.; Zimbelman, H. F.

    1981-01-01

    The LASS computer program provides a tool for interactive preliminary and conceptual design of LSS. Eight program modules were developed, including four automated model geometry generators, an associated mass properties module, an appendage synthesizer module, an rf analysis module, and an orbital transfer analysis module. The existing rigid body controls analysis module was modified to permit analysis of effects of solar pressure on orbital performance. A description of each module, user instructions, and programmer information are included.

  12. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Pt. 50, App. N Appendix N to Par...

  13. Urban stormwater runoff study at Davenport, Iowa

    USGS Publications Warehouse

    Schaap, Bryan D.

    1995-01-01

    Urban storm water runoff is being investigated as a nonpoint source of pollution across the country as urban areas with populations over 100,000 conduct studies designed to meet U.S. Environmental Protection Agency guidelines for National Pollutant Discharge Elimination System permits for their stormwater discharges. From 1991 through 1994, the City of Davenport, Iowa (fig. 1), and the U.S. Geological Survey cooperatively conducted a study designed to meet technical conditions of the permit application and to develop the criteria for ongoing monitoring during the term of the permit. 

  14. Lessons from Queensland's last-drinks legislation: The use of extended trading permits.

    PubMed

    Zahnow, Renee; Miller, Peter; Coomber, Kerri; de Andrade, Dominique; Ferris, Jason

    2018-05-01

    The association between alcohol availability, alcohol consumption and, in turn, alcohol-related harms is well established. Policies to reduce alcohol-related harms focus on limiting accessibility through the regulation of the liquor industry, including trading hours. On 1 July 2016, the Queensland Government introduced legislation to reduce ordinary liquor trading hours, replacing 5 am closing times with 3 am cessation of liquor sales in designated entertainment precincts and 2 am cessation of sales across the rest of the state. However, the amendment was under-inclusive and did not apply to temporary extended trading permits, a provision of the Liquor Act 1992 allowing one-off variations in trading hours for special events. We use 24 months of data (1 January 2015 to 31 December 2016) from the Office of Liquor Gaming and Regulation to explore patterns of extended trading permit use across Queensland, pre- and post- 1 July 2016. We find that following the Amendment in 2016 there was also a distinct shift in the utilisation of temporary extended trading permits, with a 63% increase in approved permits between 2015 and 2016. Temporal clustering around key calendar events dissipated following 1 July 2016 with consistent concentration of permit utilisation over consecutive weeks. Using temporary extended trading permits venue owners avoided earlier closing times and continued to operate until 5 am. The findings provide lessons for future policy implementation by illustrating the capacity for under-inclusive legislation to result in the dilution of intended effects. © 2018 Australasian Professional Society on Alcohol and other Drugs.

  15. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  16. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  17. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  18. 40 CFR 71.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 71.6 Section 71.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) FEDERAL OPERATING PERMIT PROGRAMS Operating Permits § 71.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include...

  19. 36 CFR 1002.10 - Camping and food storage.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Camping and food storage... USE AND RECREATION § 1002.10 Camping and food storage. (a) The Board may require permits, designate... result in the suspension or revocation of the permit. (d) Food storage. The Board may designate all or a...

  20. 36 CFR 1002.10 - Camping and food storage.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Camping and food storage... USE AND RECREATION § 1002.10 Camping and food storage. (a) The Board may require permits, designate... result in the suspension or revocation of the permit. (d) Food storage. The Board may designate all or a...

  1. 36 CFR 1002.10 - Camping and food storage.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Camping and food storage... USE AND RECREATION § 1002.10 Camping and food storage. (a) The Board may require permits, designate... result in the suspension or revocation of the permit. (d) Food storage. The Board may designate all or a...

  2. 36 CFR 1002.10 - Camping and food storage.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Camping and food storage... USE AND RECREATION § 1002.10 Camping and food storage. (a) The Board may require permits, designate... result in the suspension or revocation of the permit. (d) Food storage. The Board may designate all or a...

  3. 78 FR 3920 - Notice of Permit Applications Received; Under the Antarctic Conservation Act of 1978 (Pub. L. 95...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... system for various activities in Antarctica and designation of certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to designate... be shed on the evolution, faunal dynamics, and/or paleobiogeography of such important vertebrate...

  4. Solid-propellant rocket motor ballistic performance variation analyses

    NASA Technical Reports Server (NTRS)

    Sforzini, R. H.; Foster, W. A., Jr.

    1975-01-01

    Results are presented of research aimed at improving the assessment of off-nominal internal ballistic performance including tailoff and thrust imbalance of two large solid-rocket motors (SRMs) firing in parallel. Previous analyses using the Monte Carlo technique were refined to permit evaluation of the effects of radial and circumferential propellant temperature gradients. Sample evaluations of the effect of the temperature gradients are presented. A separate theoretical investigation of the effect of strain rate on the burning rate of propellant indicates that the thermoelastic coupling may cause substantial variations in burning rate during highly transient operating conditions. The Monte Carlo approach was also modified to permit the effects on performance of variation in the characteristics between lots of propellants and other materials to be evaluated. This permits the variabilities for the total SRM population to be determined. A sample case shows, however, that the effect of these between-lot variations on thrust imbalances within pairs of SRMs is minor in compariosn to the effect of the within-lot variations. The revised Monte Carlo and design analysis computer programs along with instructions including format requirements for preparation of input data and illustrative examples are presented.

  5. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  6. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  7. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  8. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  9. 50 CFR 21.26 - Special Canada goose permit.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... migratory birds or species designated as endangered or threatened under the authority of the Endangered Species Act. (iii) We will only issue permits to State wildlife agencies in the conterminous United States... 3 of the Migratory Bird Treaty Act. (b) Who may receive a permit? Only State wildlife agencies...

  10. 40 CFR 233.37 - Signatures on permit applications and reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Signatures on permit applications and... DUMPING 404 STATE PROGRAM REGULATIONS Program Operation § 233.37 Signatures on permit applications and... person designating the agent. In either case, the signature of the applicant or the agent will be...

  11. 30 CFR 761.17 - Regulatory authority obligations at time of permit application review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... permit application review. 761.17 Section 761.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR AREAS UNSUITABLE FOR MINING AREAS DESIGNATED BY ACT OF... of an administratively complete application for a permit for a surface coal mining operation, or an...

  12. 10 CFR 725.24 - Administration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Administration. 725.24 Section 725.24 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.24 Administration. With respect to each permit... designate a DOE or National Nuclear Security Administration office which will: (a) Process all personnel...

  13. 76 FR 48184 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... developed regulations for the establishment of a permit system for various activities in Antarctica and... establish such a permit system to designate Antarctic Specially Protected Areas. The applications received... established in 1986 studying the foraging ecology, population dynamics, census and reproductive success and...

  14. 40 CFR 72.65 - Public notice of opportunities for public comment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.65... area where the source covered by the Acid Rain permit application is located or in a State publication... designated representative for the affected source. (3) Identification of each unit covered by the Acid Rain...

  15. 40 CFR 72.65 - Public notice of opportunities for public comment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.65... area where the source covered by the Acid Rain permit application is located or in a State publication... designated representative for the affected source. (3) Identification of each unit covered by the Acid Rain...

  16. 40 CFR 72.65 - Public notice of opportunities for public comment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.65... area where the source covered by the Acid Rain permit application is located or in a State publication... designated representative for the affected source. (3) Identification of each unit covered by the Acid Rain...

  17. 40 CFR 72.65 - Public notice of opportunities for public comment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Federal Acid Rain Permit Issuance Procedures § 72.65... area where the source covered by the Acid Rain permit application is located or in a State publication... designated representative for the affected source. (3) Identification of each unit covered by the Acid Rain...

  18. 10 CFR 725.24 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Administration. 725.24 Section 725.24 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.24 Administration. With respect to each permit... designate a DOE or National Nuclear Security Administration office which will: (a) Process all personnel...

  19. 10 CFR 725.24 - Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Administration. 725.24 Section 725.24 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.24 Administration. With respect to each permit... designate a DOE or National Nuclear Security Administration office which will: (a) Process all personnel...

  20. 10 CFR 725.24 - Administration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Administration. 725.24 Section 725.24 Energy DEPARTMENT OF ENERGY PERMITS FOR ACCESS TO RESTRICTED DATA Permits § 725.24 Administration. With respect to each permit... designate a DOE or National Nuclear Security Administration office which will: (a) Process all personnel...

  1. National launch strategy vehicle data management system

    NASA Technical Reports Server (NTRS)

    Cordes, David

    1990-01-01

    The national launch strategy vehicle data management system (NLS/VDMS) was developed as part of the 1990 NASA Summer Faculty Fellowship Program. The system was developed under the guidance of the Engineering Systems Branch of the Information Systems Office, and is intended for use within the Program Development Branch PD34. The NLS/VDMS is an on-line database system that permits the tracking of various launch vehicle configurations within the program development office. The system is designed to permit the definition of new launch vehicles, as well as the ability to display and edit existing launch vehicles. Vehicles can be grouped in logical architectures within the system. Reports generated from this package include vehicle data sheets, architecture data sheets, and vehicle flight rate reports. The topics covered include: (1) system overview; (2) initial system development; (3) supercard hypermedia authoring system; (4) the ORACLE database; and (5) system evaluation.

  2. MyEnvironment | US Environmental Protection Agency

    EPA Pesticide Factsheets

    The MyEnvironment search application is designed to provide a cross-section of environmental information based on the users location. Environmental data is displayed at local community locations. EPA Environmental data displayed within maps and reports. Results include: Environmental Data, Enviromental Map, EPA Data, EPA Map, Air, Water, Land, Health, Pollution, Climate Change, Permits, Statistics, Superfund, Brownfields, Hazardous Waste, Toxic, Releases, Cleanups, Community, Ecological Conditions

  3. 40 CFR 122.34 - As an operator of a regulated small MS4, what will my NPDES MS4 storm water permit require?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., accumulated sediments, floatables, and other debris); and ways to ensure that new flood management projects... management program designed to reduce the discharge of pollutants from your MS4 to the maximum extent... Clean Water Act. Your storm water management program must include the minimum control measures described...

  4. 76 FR 20940 - Troy Mine, Incorporated, Troy Mine Revised Reclamation Plan, Kootenai National Forest, Lincoln...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... mine. The ore is mined using the ``room-and-pillar method.'' The mine permit area covers 2,782 acres of.... Production stopped in 1993 and reinitiated in 2005 and is projected to continue for 3-5 years until the... evaluations necessary to complete design of reclamation elements that include a short-term water management...

  5. Whales, Dolphins, and Porpoises of the Western North Atlantic: A Guide to Their Identification.

    ERIC Educational Resources Information Center

    Leatherwood, Stephen; And Others

    This field guide is designed to permit observers to identify the cetaceans (whales, dolphins, and porpoises) they see in western North Atlantic, including the Caribbean Sea, the Gulf of Mexico, and the coastal waters of the United States and Canada. The animals described are not grouped by scientific relationships but by similarities in appearance…

  6. You Can't Kill a Wasp with a Postage Stamp, or How to Teach 'Em to Pass Element Nine.

    ERIC Educational Resources Information Center

    Harden, Heather

    For student radio broadcasters to acquire a third class operators permit, they must pass Element 9 of the Federal Communications Commission exam. A course was designed to help these amateurs acquire such technical competencies as meter reading, metric conversions, and familiarity with directional antennas. This course description includes a list…

  7. 40 CFR 123.35 - As the NPDES Permitting Authority for regulated small MS4s, what is my role?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MS4 storm water program.) (b) You must develop a process, as well as criteria, to designate small MS4s... under the NPDES storm water discharge control program. This process must include the authority to... storm water discharge results in or has the potential to result in exceedances of water quality...

  8. 40 CFR 123.35 - As the NPDES Permitting Authority for regulated small MS4s, what is my role?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MS4 storm water program.) (b) You must develop a process, as well as criteria, to designate small MS4s... under the NPDES storm water discharge control program. This process must include the authority to... storm water discharge results in or has the potential to result in exceedances of water quality...

  9. 40 CFR 123.35 - As the NPDES Permitting Authority for regulated small MS4s, what is my role?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MS4 storm water program.) (b) You must develop a process, as well as criteria, to designate small MS4s... under the NPDES storm water discharge control program. This process must include the authority to... storm water discharge results in or has the potential to result in exceedances of water quality...

  10. MyEnvironment | Envirofacts | US EPA

    EPA Pesticide Factsheets

    2017-09-22

    The MyEnvironment search application is designed to provide a cross-section of environmental information based on the users location. Environmental data is displayed at local community locations. EPA Environmental data displayed within maps and reports. Results include: Environmental Data, Enviromental Map, EPA Data, EPA Map, Air, Water, Land, Health, Pollution, Climate Change, Permits, Statistics, Superfund, Brownfields, Hazardous Waste, Toxic, Releases, Cleanups, Community, Ecological Conditions

  11. Safe Driving in Illinois. A Manual to Accompany the Illinois Rules of the Road.

    ERIC Educational Resources Information Center

    Rice, Gail; Nowack, Linda

    Designed to accompany and supplement the Illinois Rules of the Road manual, this book is intended to better prepare future drivers for the written test for the instruction permit or driver's license. It includes many pictures and shows and describes driving situations a driver will probably face when behind the wheel. Parts dealing with important…

  12. 43 CFR 7.36 - Permit reviews and disputes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... professional issues involved in a bureau permitting decision, such as professional qualifications, research design, or other professional archaeological matters. The Departmental Consulting Archeologist shall make...

  13. 43 CFR 7.36 - Permit reviews and disputes.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... professional issues involved in a bureau permitting decision, such as professional qualifications, research design, or other professional archaeological matters. The Departmental Consulting Archeologist shall make...

  14. GENERAL EARTHQUAKE-OBSERVATION SYSTEM (GEOS).

    USGS Publications Warehouse

    Borcherdt, R.D.; Fletcher, Joe B.; Jensen, E.G.; Maxwell, G.L.; VanSchaack, J.R.; Warrick, R.E.; Cranswick, E.; Johnston, M.J.S.; McClearn, R.

    1985-01-01

    Microprocessor technology has permitted the development of a General Earthquake-Observation System (GEOS) useful for most seismic applications. Central-processing-unit control via robust software of system functions that are isolated on hardware modules permits field adaptability of the system to a wide variety of active and passive seismic experiments and straightforward modification for incorporation of improvements in technology. Various laboratory tests and numerous deployments of a set of the systems in the field have confirmed design goals, including: wide linear dynamic range (16 bit/96 dB); broad bandwidth (36 hr to 600 Hz; greater than 36 hr available); selectable sensor-type (accelerometer, seismometer, dilatometer); selectable channels (1 to 6); selectable record mode (continuous, preset, trigger); large data capacity (1. 4 to 60 Mbytes); selectable time standard (WWVB, master, manual); automatic self-calibration; simple field operation; full capability to adapt system in the field to a wide variety of experiments; low power; portability; and modest costs. System design goals for a microcomputer-controlled system with modular software and hardware components as implemented on the GEOS are presented. The systems have been deployed for 15 experiments, including: studies of near-source strong motion; high-frequency microearthquakes; crustal structure; down-hole wave propagation; teleseismicity; and earth-tidal strains.

  15. Approaches to Streamline Air Permitting for Combined Heat and Power: Permits by Rule and General Permits

    EPA Pesticide Factsheets

    This factsheet provides information about permit by rule (PBR) and general permit (GP) processes, including the factors that contributed to their development and lessons learned from their implementation.

  16. 77 FR 66893 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... Permit Designated Market Makers and Floor Brokers To Use Personal Portable Phone Devices on the Trading Floor Following the Aftermath of Hurricane Sandy From October 31, 2012 Until the Earlier of When Phone... would not permit Designated Market Makers (``DMMs'') and Floor brokers to use personal portable phone...

  17. 36 CFR 13.974 - Camping from October 1 through April 14.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Preserve Frontcountry Developed Area (fda) § 13.974 Camping from October 1 through April 14. (a) Camping is prohibited in the FDA except in designated campgrounds and the designated area where the park road is closed... on the park Web site. (b) Camping in the FDA without a permit is prohibited. Violation of permit...

  18. 36 CFR 13.974 - Camping from October 1 through April 14.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Preserve Frontcountry Developed Area (fda) § 13.974 Camping from October 1 through April 14. (a) Camping is prohibited in the FDA except in designated campgrounds and the designated area where the park road is closed... on the park Web site. (b) Camping in the FDA without a permit is prohibited. Violation of permit...

  19. 36 CFR 13.974 - Camping from October 1 through April 14.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Preserve Frontcountry Developed Area (fda) § 13.974 Camping from October 1 through April 14. (a) Camping is prohibited in the FDA except in designated campgrounds and the designated area where the park road is closed... on the park Web site. (b) Camping in the FDA without a permit is prohibited. Violation of permit...

  20. 15 CFR 922.47 - Pre-existing authorizations or rights and certifications of pre-existing authorizations or rights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...

  1. 15 CFR 922.47 - Pre-existing authorizations or rights and certifications of pre-existing authorizations or rights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... rights of subsistence use or access in existence on the date of designation of any National Marine... leases, permits, licenses, or rights consistent with the purposes for which the Sanctuary was designated... authorized by a valid lease, permit, license, approval or other authorization in existence on the effective...

  2. 33 CFR Appendix A to Part 325 - Permit Form and Special Conditions

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... need to obtain other Federal, state, or local authorizations required by law. b. This permit does not... specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for.... (Permittee) (Date) This permit becomes effective when the Federal official, designated to act for the...

  3. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ...-approved Prevention of Significant Deterioration (PSD) permit programs. These revisions update the definitions used in the districts' PSD permit programs. DATES: This rule is effective on July 5, 2011 without... Deterioration (PSD) permit program. Both the NSCAPCD and MCAQMD are currently designated as attainment or...

  4. 78 FR 24768 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2013-N094; FXES11130300000F3-234... Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY... Survey and Design, LLC, Temperance, MI. The applicant requests a permit to take (capture and release...

  5. 78 FR 70075 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Public Law...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... establishment of a permit system for various activities in Antarctica and designation of certain animals and certain geographic areas a requiring special protection. The regulations establish such a permit system to..., stable isotope analysis, and DNA extraction. Data would be used to reconstruct seal population dynamics...

  6. The CELSS Test Facility Project - An example of a CELSS flight experiment system

    NASA Technical Reports Server (NTRS)

    Macelroy, R. D.; Straight, C. L.

    1992-01-01

    The design of the facility is described in terms of its use as an investigation tool for evaluating crop growth in space with reference to required emerging technologies. NASA's CELSS Test Facility (CTF) is designed to permit the measurement of crop-plant productivity under microgravity conditions including biomass production, food production, water transpiration, and O2/CO2 exchanges. Crucial hardware tests and qualifications are identified to assure the operation of CTF technologies in space including the nutrient-delivery, water-condensation, and gas-liquid-mixing subsystems. The design concept and related scientific requirements are described and shown to provide microgravity crop research. The CTF is expected to provide data for plant research and for concepts for bioregenerative life-support systems for applications to Martian, lunar, and space-station missions.

  7. 50 CFR 665.803 - Notifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... notification of the trip type (either deep-setting or shallow-setting). (b) The permit holder, or designated... in processing an application, permit holders failing to receive important notifications, or sanctions...

  8. 76 FR 17666 - Endangered and Threatened Wildlife and Plants; Permits; Joint Supplemental Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... wildlife by significantly impairing essential behavior patterns, including breeding, feeding, or sheltering... section 10 permit is not required. However, plant species may be included on a permit in recognition of...

  9. Mission-oriented requirements for updating MIL-H-8501: Calspan proposed structure and rationale

    NASA Technical Reports Server (NTRS)

    Chalk, C. R.; Radford, R. C.

    1985-01-01

    This report documents the effort by Arvin/Calspan Corporation to formulate a revision of MIL-H-8501A in terms of Mission-Oriented Flying Qualities Requirements for Military Rotorcraft. Emphasis is placed on development of a specification structure which will permit addressing Operational Missions and Flight Phases, Flight Regions, Classification of Required Operational Capability, Categorization of Flight Phases, and Levels of Flying Qualities. A number of definitions is established to permit addressing the rotorcraft state, flight envelopes, environments, and the conditions under which degraded flying qualities are permitted. Tentative requirements are drafted for Required Operational Capability Class 1. Also included is a Background Information and Users Guide for the draft specification structure proposed for the MIL-H-8501A revision. The report also contains a discussion of critical data gaps and attempts to prioritize these data gaps and to suggest experiments that should be performed to generate data needed to support formulation of quantitative design criteria for the additional Operational Capability Classes 2, 3, and 4.

  10. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  11. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  12. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  13. 40 CFR 70.6 - Permit content.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Permit content. 70.6 Section 70.6 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STATE OPERATING PERMIT PROGRAMS § 70.6 Permit content. (a) Standard permit requirements. Each permit issued under this part shall include the following...

  14. Vision Guided Intelligent Robot Design And Experiments

    NASA Astrophysics Data System (ADS)

    Slutzky, G. D.; Hall, E. L.

    1988-02-01

    The concept of an intelligent robot is an important topic combining sensors, manipulators, and artificial intelligence to design a useful machine. Vision systems, tactile sensors, proximity switches and other sensors provide the elements necessary for simple game playing as well as industrial applications. These sensors permit adaption to a changing environment. The AI techniques permit advanced forms of decision making, adaptive responses, and learning while the manipulator provides the ability to perform various tasks. Computer languages such as LISP and OPS5, have been utilized to achieve expert systems approaches in solving real world problems. The purpose of this paper is to describe several examples of visually guided intelligent robots including both stationary and mobile robots. Demonstrations will be presented of a system for constructing and solving a popular peg game, a robot lawn mower, and a box stacking robot. The experience gained from these and other systems provide insight into what may be realistically expected from the next generation of intelligent machines.

  15. Technical overview of the millimeter-wave imaging reflectometer on the DIII-D tokamak (invited)

    DOE PAGES

    Muscatello, Christopher M.; Domier, Calvin W.; Hu, Xing; ...

    2014-07-22

    The two-dimensional mm-wave imaging reflectometer (MIR) on DIII-D is a multi-faceted device for diagnosing electron density fluctuations in fusion plasmas. Its multi-channel, multi-frequency capabilities and high sensitivity permit visualization and quantitative diagnosis of density perturbations, including correlation length, wavenumber, mode propagation velocity, and dispersion. The two-dimensional capabilities of MIR are made possible with twelve vertically separated sightlines and four-frequency operation (corresponding to four radial channels). The 48-channel DIII-D MIR system has a tunable source that can be stepped in 500 µs increments over a range of 56 to 74 GHz. An innovative optical design keeps both on-axis and off-axis channelsmore » focused at the cutoff surface, permitting imaging over an extended poloidal region. As a result, the integrity of the MIR optical design is confirmed by comparing Gaussian beam calculations to laboratory measurements of the transmitter beam pattern and receiver antenna patterns.« less

  16. Modified tandem gratings anastigmatic imaging spectrometer with oblique incidence for spectral broadband

    NASA Astrophysics Data System (ADS)

    Cui, Chengguang; Wang, Shurong; Huang, Yu; Xue, Qingsheng; Li, Bo; Yu, Lei

    2015-09-01

    A modified spectrometer with tandem gratings that exhibits high spectral resolution and imaging quality for solar observation, monitoring, and understanding of coastal ocean processes is presented in this study. Spectral broadband anastigmatic imaging condition, spectral resolution, and initial optical structure are obtained based on geometric aberration theory. Compared with conventional tandem gratings spectrometers, this modified design permits flexibility in selecting gratings. A detailed discussion of the optical design and optical performance of an ultraviolet spectrometer with tandem gratings is also included to explain the advantage of oblique incidence for spectral broadband.

  17. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  18. Starting procedure for internal combustion vessels

    DOEpatents

    Harris, Harry A.

    1978-09-26

    A vertical vessel, having a low bed of broken material, having included combustible material, is initially ignited by a plurality of ignitors spaced over the surface of the bed, by adding fresh, broken material onto the bed to buildup the bed to its operating depth and then passing a combustible mixture of gas upwardly through the material, at a rate to prevent back-firing of the gas, while air and recycled gas is passed through the bed to thereby heat the material and commence the desired laterally uniform combustion in the bed. The procedure permits precise control of the air and gaseous fuel mixtures and material rates, and permits the use of the process equipment designed for continuous operation of the vessel.

  19. Computer-aided dental prostheses construction using reverse engineering.

    PubMed

    Solaberrieta, E; Minguez, R; Barrenetxea, L; Sierra, E; Etxaniz, O

    2014-01-01

    The implementation of computer-aided design/computer-aided manufacturing (CAD/CAM) systems with virtual articulators, which take into account the kinematics, constitutes a breakthrough in the construction of customised dental prostheses. This paper presents a multidisciplinary protocol involving CAM techniques to produce dental prostheses. This protocol includes a step-by-step procedure using innovative reverse engineering technologies to transform completely virtual design processes into customised prostheses. A special emphasis is placed on a novel method that permits a virtual location of the models. The complete workflow includes the optical scanning of the patient, the use of reverse engineering software and, if necessary, the use of rapid prototyping to produce CAD temporary prostheses.

  20. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  1. 10 CFR 50.90 - Application for amendment of license, construction permit, or early site permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or early site permit. 50.90 Section 50.90 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF....90 Application for amendment of license, construction permit, or early site permit. Whenever a holder of a license, including a construction permit and operating license under this part, and an early...

  2. 40 CFR 60.4120 - General Hg budget trading program permit requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false General Hg budget trading program... budget trading program permit requirements. (a) For each Hg Budget source required to have a title V operating permit, such permit shall include a Hg Budget permit administered by the permitting authority for...

  3. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  4. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  5. 21 CFR 1210.21 - Permit number.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Permit number. 1210.21 Section 1210.21 Food and... IMPORT MILK ACT Permit Control § 1210.21 Permit number. Each permit issued under the Federal Import Milk Act, including each temporary permit, shall bear an individual number. The right to the use of such...

  6. ENGINEERING AND CONSTRUCTING THE HALLAM NUCLEAR POWER FACILITY REACTOR STRUCTURE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mahlmeister, J E; Haberer, W V; Casey, D F

    1960-12-15

    The Hallam Nuclear Power Facility reactor structure, including the cavity liner, is described, and the design philosophy and special design requirements which were developed during the preliminary and final engineering phases of the project are explained. The structure was designed for 600 deg F inlet and 1000 deg F outlet operating sodium temperatures and fabricated of austenitic and ferritic stainless steels. Support for the reactor core components and adequate containment for biological safeguards were readily provided even though quite conservative design philosophy was used. The calculated operating characteristics, including heat generation, temperature distributions and stress levels for full-power operation, aremore » summarized. Ship fabrication and field installation experiences are also briefly related. Results of this project have established that the sodium graphite reactor permits practical and economical fabrication and field erection procedures; considerably higher operating design temperatures are believed possible without radical design changes. Also, larger reactor structures can be similarly constructed for higher capacity (300 to 1000 Mwe) nuclear power plants. (auth)« less

  7. 77 FR 107 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... Competing Applications; Earth By Design, Inc. On October 13, 2011, and supplemented on October 30, 2011, Earth By Design, Inc. filed an application for a preliminary permit, pursuant to section 4(f) of the... generation of the project would be 7.2 gigawatt-hours. Applicant Contact: Mr. Jim Gordon, President, Earth By...

  8. 50 CFR 18.30 - Polar bear sport-hunted trophy import permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... International Trade in Endangered Species of Wild Fauna and Flora (CITES) and other international agreements and... hide, you must within 30 days: (i) Contact the nearest Service office at a designated port or a Law... permits. The permit will be valid for no more than one year from the date of issuance. (g) Fees. (1) You...

  9. 50 CFR 18.30 - Polar bear sport-hunted trophy import permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... International Trade in Endangered Species of Wild Fauna and Flora (CITES) and other international agreements and... hide, you must within 30 days: (i) Contact the nearest Service office at a designated port or a Law... permits. The permit will be valid for no more than one year from the date of issuance. (g) Fees. (1) You...

  10. 75 FR 57299 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-20

    ... Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system for various... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas...

  11. 76 FR 61117 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... Antarctic Conservation Act of 1978 (Pub. L. 95-541), as amended by the Antarctic Science, Tourism and Conservation Act of 1996, has developed regulations for the establishment of a permit system for various... protection. The regulations establish such a permit system to designate Antarctic Specially Protected Areas...

  12. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  13. 25 CFR 247.16 - What fire is permitted?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What fire is permitted? 247.16 Section 247.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE USE OF COLUMBIA RIVER TREATY FISHING ACCESS SITES § 247.16 What fire is permitted? (a) You may have a fire in designated fire places...

  14. Planar multi-electrode array sensor for localized electrochemical corrosion detection

    DOEpatents

    Tormoen, Garth William; Brossia, Christopher Sean

    2014-01-07

    A planarized type of coupled multi-electrode corrosion sensing device. Electrode pads are fabricated on a thin backing, such as a thin film. Each pad has an associated electrical lead for connection to auxiliary electronic circuitry, which may include a resistor associated with each electrical pad. The design permits the device to be easily placed in small crevices or under coatings such as paint.

  15. WATER COOLED RETORT COVER

    DOEpatents

    Ash, W.J.; Pozzi, J.F.

    1962-05-01

    A retort cover is designed for use in the production of magnesium metal by the condensation of vaporized metal on a collecting surface. The cover includes a condensing surface, insulating means adjacent to the condensing surface, ind a water-cooled means for the insulating means. The irrangement of insulation and the cooling means permits the magnesium to be condensed at a high temperature and in massive nonpyrophoric form. (AEC)

  16. The Pit and the Pendulum: The Impact on Teen Smokers of Including a Designated Smoking Area in School Tobacco Control Policy

    ERIC Educational Resources Information Center

    Baillie, L. E.; Lovato, C. Y.; Taylor, E.; Rutherford, M. B.; Smith, M.

    2008-01-01

    Thirty per cent of school districts in British Columbia do not ban smoking outright on school grounds, and in several instances, smoking is permitted in smoking pits, regardless of school district policy. While there is evidence to suggest that enforcing a tobacco-free environment for students does reduce adolescent smoking rates, the concomitant…

  17. 29 CFR 102.114 - Filing and service of papers by parties; form of papers; manner and proof of filing or service...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., including facsimile transmission, is permitted only with the consent of the party being served. Unless... telephone, followed by service of a copy in a manner designed to insure receipt by them by the close of the... objections by facsimile transmission pursuant to this section, receipt of the transmitted document by the...

  18. 29 CFR 102.114 - Filing and service of papers by parties; form of papers; manner and proof of filing or service...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., including facsimile transmission, is permitted only with the consent of the party being served. Unless... telephone, followed by service of a copy in a manner designed to insure receipt by them by the close of the... objections by facsimile transmission pursuant to this section, receipt of the transmitted document by the...

  19. Whales, Dolphins, and Porpoises of the Eastern North Pacific and Adjacent Arctic Waters: A Guide to Their Identification.

    ERIC Educational Resources Information Center

    Leatherwood, Stephen; And Others

    This field guide is designed to permit observers to identify the cetaceans (whales, dolphins, and porpoises) they see in the waters of the eastern North Pacific, including the Gulf of California, Hawaii, and the western Arctic of North America. The animals described are grouped not by scientific relationships but by similarities in appearance in…

  20. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less

  1. NPDES Permit Writers' Manual for Concentrated Animal Feeding Operations

    EPA Pesticide Factsheets

    This manual is designed to provide general information on the CWA and NPDES requirements for CAFOs, explain CAFO permitting, and provide technical information to understand options for nutrients management planning.

  2. 40 CFR 72.9 - Standard requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) PERMITS REGULATION Acid Rain Program General Provisions § 72.9 Standard requirements. (a) Permit... shall: (i) Submit a complete Acid Rain permit application (including a compliance plan) under this part... information that the permitting authority determines is necessary in order to review an Acid Rain permit...

  3. 40 CFR 72.9 - Standard requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) PERMITS REGULATION Acid Rain Program General Provisions § 72.9 Standard requirements. (a) Permit... shall: (i) Submit a complete Acid Rain permit application (including a compliance plan) under this part... information that the permitting authority determines is necessary in order to review an Acid Rain permit...

  4. 40 CFR 72.9 - Standard requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) PERMITS REGULATION Acid Rain Program General Provisions § 72.9 Standard requirements. (a) Permit... shall: (i) Submit a complete Acid Rain permit application (including a compliance plan) under this part... information that the permitting authority determines is necessary in order to review an Acid Rain permit...

  5. 40 CFR 72.9 - Standard requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) PERMITS REGULATION Acid Rain Program General Provisions § 72.9 Standard requirements. (a) Permit... shall: (i) Submit a complete Acid Rain permit application (including a compliance plan) under this part... information that the permitting authority determines is necessary in order to review an Acid Rain permit...

  6. 40 CFR 72.9 - Standard requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) PERMITS REGULATION Acid Rain Program General Provisions § 72.9 Standard requirements. (a) Permit... shall: (i) Submit a complete Acid Rain permit application (including a compliance plan) under this part... information that the permitting authority determines is necessary in order to review an Acid Rain permit...

  7. 40 CFR 74.12 - Opt-in permit contents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Opt-in permit contents. 74.12 Section 74.12 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Permitting Procedures § 74.12 Opt-in permit contents. (a) The opt-in permit shall be included in the Acid Rain permit. (b)...

  8. Utah geothermal institutional handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagstaff, L.W.; Green, S.

    1982-01-01

    Included in the Handbook are lists of the main permits required and the names of agencies and persons associated with the permits; a summary of pertinent laws, regulations, and permits; and charts outlining typical development and permitting procedures.

  9. 40 CFR 96.283 - Applying for CAIR opt-in permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Opt-in Units § 96.283 Applying for CAIR opt-in permit. (a) Applying for initial CAIR opt-in permit. The CAIR designated representative of a unit meeting the requirements for a CAIR SO2 opt-in unit...

  10. Implementing Clinical Research Using Factorial Designs: A Primer.

    PubMed

    Baker, Timothy B; Smith, Stevens S; Bolt, Daniel M; Loh, Wei-Yin; Mermelstein, Robin; Fiore, Michael C; Piper, Megan E; Collins, Linda M

    2017-07-01

    Factorial experiments have rarely been used in the development or evaluation of clinical interventions. However, factorial designs offer advantages over randomized controlled trial designs, the latter being much more frequently used in such research. Factorial designs are highly efficient (permitting evaluation of multiple intervention components with good statistical power) and present the opportunity to detect interactions amongst intervention components. Such advantages have led methodologists to advocate for the greater use of factorial designs in research on clinical interventions (Collins, Dziak, & Li, 2009). However, researchers considering the use of such designs in clinical research face a series of choices that have consequential implications for the interpretability and value of the experimental results. These choices include: whether to use a factorial design, selection of the number and type of factors to include, how to address the compatibility of the different factors included, whether and how to avoid confounds between the type and number of interventions a participant receives, and how to interpret interactions. The use of factorial designs in clinical intervention research poses choices that differ from those typically considered in randomized clinical trial designs. However, the great information yield of the former encourages clinical researchers' increased and careful execution of such designs. Copyright © 2017. Published by Elsevier Ltd.

  11. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 17 2012-07-01 2012-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  12. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  13. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  14. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  15. 40 CFR 72.31 - Information requirements for Acid Rain permit applications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 17 2014-07-01 2014-07-01 false Information requirements for Acid Rain... (CONTINUED) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Permit Applications § 72.31 Information requirements for Acid Rain permit applications. A complete Acid Rain permit application shall include the...

  16. Study of liquid oxygen/liquid hydrogen auxiliary propulsion systems for the space tug

    NASA Technical Reports Server (NTRS)

    Nichols, J. F.

    1975-01-01

    Design concepts are considered that permit use of a liquid-liquid (as opposed to gas-gas) oxygen/hydrogen thrust chamber for attitude control and auxiliary propulsion thrusters on the space tug. The best of the auxiliary propulsion system concepts are defined and their principal characteristics, including cost as well as operational capabilities, are established. Design requirements for each of the major components of the systems, including thrusters, are developed at the conceptual level. The competitive concepts considered use both dedicated (separate tanks) and integrated (propellant from main propulsion tanks) propellant supply. The integrated concept is selected as best for the space tug after comparative evaluation against both cryogenic and storable propellant dedicated systems. A preliminary design of the selected system is established and recommendations for supporting research and technology to further the concept are presented.

  17. Design of an Intelligent Front-End Signal Conditioning Circuit for IR Sensors

    NASA Astrophysics Data System (ADS)

    de Arcas, G.; Ruiz, M.; Lopez, J. M.; Gutierrez, R.; Villamayor, V.; Gomez, L.; Montojo, Mª. T.

    2008-02-01

    This paper presents the design of an intelligent front-end signal conditioning system for IR sensors. The system has been developed as an interface between a PbSe IR sensor matrix and a TMS320C67x digital signal processor. The system architecture ensures its scalability so it can be used for sensors with different matrix sizes. It includes an integrator based signal conditioning circuit, a data acquisition converter block, and a FPGA based advanced control block that permits including high level image preprocessing routines such as faulty pixel detection and sensor calibration in the signal conditioning front-end. During the design phase virtual instrumentation technologies proved to be a very valuable tool for prototyping when choosing the best A/D converter type for the application. Development time was significantly reduced due to the use of this technology.

  18. 40 CFR 221.5 - Processing fees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be charged in connection with each application for a permit for dumping in an existing dump site... with each application for a permit for dumping in a dump site other than a dump site designated in this...

  19. 40 CFR 221.5 - Processing fees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be charged in connection with each application for a permit for dumping in an existing dump site... with each application for a permit for dumping in a dump site other than a dump site designated in this...

  20. Proposed modifications to the RCRA post-closure permit for the Upper East Fork Poplar Creek Hydrogeologic Regime at the U.S. Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report presents proposed modifications to the Resource Conservation and Recovery Act (RCRA) Post-Closure Permit (PCP) for the Upper East Fork Poplar Creek Hydrogeologic Regime (permit number TNHW-088, EPA ID No. TN3 89 009 0001). The modifications are proposed to: (1) revise the current text for two of the Permit Conditions included in Permit Section II - General Facility Conditions, and (2) update the PCP with revised versions of the Y-12 Plant Groundwater Protection Program (GWPP) technical field procedures included in several of the Permit Attachments. The updated field procedures and editorial revisions are Class 1 permit modifications, as specifiedmore » in Title 40, Code of Federal Regulations (CFR) {section}270.42; Appendix I - Classification of Permit Modifications. These modifications are summarized below.« less

  1. Modeling Tools for Propulsion Analysis and Computational Fluid Dynamics on the Internet

    NASA Technical Reports Server (NTRS)

    Muss, J. A.; Johnson, C. W.; Gotchy, M. B.

    2000-01-01

    The existing RocketWeb(TradeMark) Internet Analysis System (httr)://www.iohnsonrockets.com/rocketweb) provides an integrated set of advanced analysis tools that can be securely accessed over the Internet. Since these tools consist of both batch and interactive analysis codes, the system includes convenient methods for creating input files and evaluating the resulting data. The RocketWeb(TradeMark) system also contains many features that permit data sharing which, when further developed, will facilitate real-time, geographically diverse, collaborative engineering within a designated work group. Adding work group management functionality while simultaneously extending and integrating the system's set of design and analysis tools will create a system providing rigorous, controlled design development, reducing design cycle time and cost.

  2. 40 CFR 63.93 - Approval of State requirements that substitute for a section 112 rule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., board and administrative orders, permits issued pursuant to permit templates, or State operating permits... respective Federal rule; (2) Levels of control (including associated performance test methods) and compliance... must include monitoring or another method for determining compliance. (ii) If a standard in the...

  3. Supplemental Environmental Assessment to the U.S. Air Force February 1995 Environmental Assessment for the California Spaceport

    DTIC Science & Technology

    2011-08-01

    communities are adapted to periodic burning, and many plant species re-sprout readily after fire. Where disturbances are more frequent and intense...and missile operations include the following: continue supporting Air Force Space Command; incorporate flexibility that will permit adaptation to...designated critical habitat for southern steelhead trout located on VAFB (USAF 2011e). Abalone are gastropods Supplemental Environmental Assessment to the

  4. Edible Oil Barriers for Treatment of Chlorinated Solvent and Perchlorate-Contaminated Groundwater

    DTIC Science & Technology

    2010-02-01

    This page left blank intentionally. 9 3.0 TECHNOLOGY The emulsified oil technology is a low- cost process for delivering a low solubility, slowly...associated with the actual injection process , including costs for installing the injection and monitoring wells, purchasing the substrate for injection...large area can be significantly lower due to economies of scale during injection and the relatively lower design, permitting, and monitoring costs

  5. Relativistic electron beam device

    DOEpatents

    Freeman, J.R.; Poukey, J.W.; Shope, S.L.; Yonas, G.

    1975-07-01

    A design is given for an electron beam device for irradiating spherical hydrogen isotope bearing targets. The accelerator, which includes hollow cathodes facing each other, injects an anode plasma between the cathodes and produces an approximately 10 nanosecond, megajoule pulse between the anode plasma and the cathodes. Targets may be repetitively positioned within the plasma between the cathodes, and accelerator diode arrangement permits materials to survive operation in a fusion power source. (auth)

  6. Neural Networks for Flight Control

    NASA Technical Reports Server (NTRS)

    Jorgensen, Charles C.

    1996-01-01

    Neural networks are being developed at NASA Ames Research Center to permit real-time adaptive control of time varying nonlinear systems, enhance the fault-tolerance of mission hardware, and permit online system reconfiguration. In general, the problem of controlling time varying nonlinear systems with unknown structures has not been solved. Adaptive neural control techniques show considerable promise and are being applied to technical challenges including automated docking of spacecraft, dynamic balancing of the space station centrifuge, online reconfiguration of damaged aircraft, and reducing cost of new air and spacecraft designs. Our experiences have shown that neural network algorithms solved certain problems that conventional control methods have been unable to effectively address. These include damage mitigation in nonlinear reconfiguration flight control, early performance estimation of new aircraft designs, compensation for damaged planetary mission hardware by using redundant manipulator capability, and space sensor platform stabilization. This presentation explored these developments in the context of neural network control theory. The discussion began with an overview of why neural control has proven attractive for NASA application domains. The more important issues in control system development were then discussed with references to significant technical advances in the literature. Examples of how these methods have been applied were given, followed by projections of emerging application needs and directions.

  7. Triaxial thermopile array geo-heat-flow sensor

    DOEpatents

    Carrigan, C.R.; Hardee, H.C.; Reynolds, G.D.; Steinfort, T.D.

    1990-01-01

    A triaxial thermopile array geothermal heat flow sensor is designed to measure heat flow in three dimensions in a reconstituted or unperturbed subsurface regime. Heat flow can be measured in conductive or permeable convective media. The sensor may be encased in protective pvc tubing and includes a plurality of thermistors and an array of heat flow transducers produce voltage proportional to heat flux along the subsurface regime and permit direct measurement of heat flow in the subsurface regime. The presence of the thermistor array permits a comparison to be made between the heat flow estimates obtained from the transducers and heat flow calculated using temperature differences and Fourier's Law. The device is extremely sensitive with an accuracy of less than 0.1 Heat Flow Units (HFU) and may be used for long term readings. 6 figs.

  8. Multistep fluorescence gated proportional counters

    NASA Technical Reports Server (NTRS)

    Ramsey, Brian D.; Weisskopf, Martin C.

    1990-01-01

    A proportional counter is introduced in which the levels of energy and spatial resolutions and background rejection permit the application of the device to X-ray astronomy. A multistep approach is employed in which photons cause a signal that triggers the system and measures the energy of the incident photon. The multistep approach permits good energy resolution from parallel geometry and from the imaging stage due to coupling of the imaging and amplification stages. The design also employs fluorescence gating to reduce background, a method that is compatible with the multistep technique. Use of the proportional counter is reported for NASA's supernova campaign, and the pair background is below 0.0001 counts/sq cm sec keV at the xenon k-edge. Potential improvements and applications are listed including the CASES, POF, and EXOSS mission programs.

  9. Design and analysis of composite structures with stress concentrations

    NASA Technical Reports Server (NTRS)

    Garbo, S. P.

    1983-01-01

    An overview of an analytic procedure which can be used to provide comprehensive stress and strength analysis of composite structures with stress concentrations is given. The methodology provides designer/analysts with a user-oriented procedure which, within acceptable engineering accuracy, accounts for the effects of a wide range of application design variables. The procedure permits the strength of arbitrary laminate constructions under general bearing/bypass load conditions to be predicted with only unnotched unidirectional strength and stiffness input data required. Included is a brief discussion of the relevancy of this analysis to the design of primary aircraft structure; an overview of the analytic procedure with theory/test correlations; and an example of the use and interaction of this strength analysis relative to the design of high-load transfer bolted composite joints.

  10. 40 CFR 96.23 - NOX Budget permit contents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false NOX Budget permit contents. 96.23... (CONTINUED) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS Permits § 96.23 NOX Budget permit contents. (a) Each NOX Budget permit (including any draft or proposed...

  11. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  12. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  13. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  14. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  15. 40 CFR 72.72 - Criteria for State operating permit program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.72 Criteria for State operating permit program. A State operating permit program (including a State Acid Rain program) shall meet... withdrawal of all or part of the Acid Rain portion of an approved State operating permit program by the...

  16. Study designs to enhance identification of genetic factors in healthy aging.

    PubMed

    Manolio, Teri A

    2007-12-01

    The sequencing of the human genome and the growing understanding of its function are providing powerful new research tools for identifying genetic variants that are associated with complex diseases and traits. Somewhat less emphasis has been given to genes related to healthy aging, although the approaches for studying health-related traits are analogous to those used for disease-related studies. A critical step prior to the design of such studies is to define a healthy aging phenotype, which should be standardized to permit comparisons across studies and should involve more than simple longevity. Phenotypes of particular value for genetic research are those with high heritability and close relationships to gene products or pathways, preferably with minimal or at least measurable environmental influences. Appropriate study designs to identify genotype-phenotype associations include family-based linkage studies, candidate gene association analyses, and genome-wide association studies. Advances in genotyping and sequencing technologies, and the generation of the human haplotype map database, now permit the cost-effective investigation of the very large sample sizes needed for genome-wide association studies in unrelated individuals. Challenges in interpretation and translation of such studies include assessing the potential for bias and confounding, as well as determining the clinical validity and utility of findings proposed for wider application. Many such studies are currently supported or being planned across the National Institutes of Health (NIH), and lend themselves to the kind of coordinated clinical research envisioned in programs such as the NIH Roadmap.

  17. Learner Performance Accounting: A Tri-Cycle Process

    ERIC Educational Resources Information Center

    Brown, Thomas C.; McCleary, Lloyd E.

    1973-01-01

    The Tri-Cycle Process described in the model permits for the first time an integrated system for designing an individualized instructional system that would permit a rational, diagnosis-prescription-evaluation system keyed to an accounting system. (Author)

  18. Nitrate Waste Treatment Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.; Martinez, Patrick Thomas; Garcia, Terrence Kerwin

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  19. PERMITTING HAZARDOUS WASTE INCINERATORS

    EPA Science Inventory

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  20. Design, development and fabrication of a Solar Experiment Alignment Sensor (SEAS)

    NASA Technical Reports Server (NTRS)

    Bancroft, J. R.; Fain, M. Z.; Johnson, D. F.

    1971-01-01

    The design, development and testing of a laboratory SEAS (Solar Experiment Alignment Sensor) system are presented. The system is capable of overcoming traditional alignment and calibration problems to permit pointing anywhere on the solar disc to an accuracy of five arc seconds. The concept, development and laboratory testing phases of the program are discussed, and particular attention has been given to specific problems associated with selection of materials, and components. The conclusions summarize performance capability and discuss areas for further study including the effects of solar limb darkening and effects of annual variations in the apparent solar diameter.

  1. Evaluation of occupational health interventions using a randomized controlled trial: challenges and alternative research designs.

    PubMed

    Schelvis, Roosmarijn M C; Oude Hengel, Karen M; Burdorf, Alex; Blatter, Birgitte M; Strijk, Jorien E; van der Beek, Allard J

    2015-09-01

    Occupational health researchers regularly conduct evaluative intervention research for which a randomized controlled trial (RCT) may not be the most appropriate design (eg, effects of policy measures, organizational interventions on work schedules). This article demonstrates the appropriateness of alternative designs for the evaluation of occupational health interventions, which permit causal inferences, formulated along two study design approaches: experimental (stepped-wedge) and observational (propensity scores, instrumental variables, multiple baseline design, interrupted time series, difference-in-difference, and regression discontinuity). For each design, the unique characteristics are presented including the advantages and disadvantages compared to the RCT, illustrated by empirical examples in occupational health. This overview shows that several appropriate alternatives for the RCT design are feasible and available, which may provide sufficiently strong evidence to guide decisions on implementation of interventions in workplaces. Researchers are encouraged to continue exploring these designs and thus contribute to evidence-based occupational health.

  2. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a totalmore » of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage Transmission Line Route, and Natural Gas Pipeline Route Permits for a Large Electric Power Generating Plant to be located in Taconite, Minnesota. In addition, major pre-construction permit applications have been filed requesting authorization for the Project to i) appropriate water sufficient to accommodate its worst case needs, ii) operate a major stationary source in compliance with regulations established to protect public health and welfare, and iii) physically alter the geographical setting to accommodate its construction. As of the current date, the Water Appropriation Permits have been obtained.« less

  3. Design considerations of CareWindows, a Windows 3.0-based graphical front end to a Medical Information Management System using a pass-through-requester architecture.

    PubMed Central

    Ward, R. E.; Purves, T.; Feldman, M.; Schiffman, R. M.; Barry, S.; Christner, M.; Kipa, G.; McCarthy, B. D.; Stiphout, R.

    1991-01-01

    The Care Windows development project demonstrated the feasibility of an approach designed to add the benefits of an event-driven, graphically-oriented user interface to an existing Medical Information Management System (MIMS) without overstepping economic and logistic constraints. The design solution selected for the Care Windows project incorporates three important design features: (1) the effective de-coupling of severs from requesters, permitting the use of an extensive pre-existing library of MIMS servers, (2) the off-loading of program control functions of the requesters to the workstation processor, reducing the load per transaction on central resources and permitting the use of object-oriented development environments available for microcomputers, (3) the selection of a low end, GUI-capable workstation consisting of a PC-compatible personal computer running Microsoft Windows 3.0, and (4) the development of a highly layered, modular workstation application, permitting the development of interchangeable modules to insure portability and adaptability. PMID:1807665

  4. 50 CFR 10.21 - Director.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... addressed to: Director, U.S. Fish and Wildlife Service, (Attention: Office of Management Authority), 4401 N... designated port permits (Attention: Import/export license); for native endangered and threatened species (Attention: Endangered/threatened species permit); and for migratory birds and eagles (Attention: Migratory...

  5. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  6. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  7. 40 CFR 258.4 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... leachate collection system designed and constructed to maintain less than a 30-cm depth of leachate on the..., or cause leachate depth on the liner to exceed 30-cm. (c) Any permit issued under this section must...

  8. Multiplex qPCR for reliable detection and differentiation of Burkholderia mallei and Burkholderia pseudomallei.

    PubMed

    Janse, Ingmar; Hamidjaja, Raditijo A; Hendriks, Amber C A; van Rotterdam, Bart J

    2013-02-14

    Burkholderia mallei and B. pseudomallei are two closely related species of highly virulent bacteria that can be difficult to detect. Pathogenic Burkholderia are endemic in many regions worldwide and cases of infection, sometimes brought by travelers from unsuspected regions, also occur elsewhere. Rapid, sensitive methods for identification of B. mallei and B. pseudomallei are urgently needed in the interests of patient treatment and epidemiological surveillance. Signature sequences for sensitive, specific detection of pathogenic Burkholderia based on published genomes were identified and a qPCR assay was designed and validated. A single-reaction quadruplex qPCR assay for the detection of pathogenic Burkholderia, which includes a marker for internal control of DNA extraction and amplification, was developed. The assay permits differentiation of B. mallei and B. pseudomallei strains, and probit analysis showed a very low detection limit. Use of a multicopy signature sequence permits detection of less than 1 genome equivalent per reaction. The new assay permits rapid detection of pathogenic Burkholderia and combines enhanced sensitivity, species differentiation, and inclusion of an internal control for both DNA extraction and PCR amplification.

  9. Final Permit Documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of finla permit documents for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  10. Study of blade aspect ratio on a compressor front stage aerodynamic and mechanical design report

    NASA Technical Reports Server (NTRS)

    Burger, G. D.; Lee, D.; Snow, D. W.

    1979-01-01

    A single stage compressor was designed with the intent of demonstrating that, for a tip speed and hub-tip ratio typical of an advanced core compressor front stage, the use of low aspect ratio can permit high levels of blade loading to be achieved at an acceptable level of efficiency. The design pressure ratio is 1.8 at an adiabatic efficiency of 88.5 percent. Both rotor and stator have multiple-circular-arc airfoil sections. Variable IGV and stator vanes permit low speed matching adjustments. The design incorporates an inlet duct representative of an engine transition duct between fan and high pressure compressor.

  11. Pressure ramp programmer; IMBLMS Phase B4 Additional Tasks: Task 3.0 pressure ramp programmer

    NASA Technical Reports Server (NTRS)

    Fogal, G. L.; Reinhardt, C. G.

    1972-01-01

    A pressure ramp programmer model was designed, fabricated and tested. This model, in conjunction with an automatic blood pressure monitor, automatically controls the pressure in the blood pressure monitor arterial cuff. The cuff pressurization cycle is designed to maximize accuracy and repeatability of blood pressure measurements. The key feature of this automatic cycle is rapid blood pressure cuff bleed down from an initial setting until systolic (diastolic) pressure is encountered followed by a short repressurization and slow bleed, long enough to permit accurate systolic (diastolic) pressure determination. The system includes a pressure reservoir which bleeds the cuff through a precision needle valve; a solenoid valve which permits rapid pressurization from the reservoir; and a pressure sensor which provides information for bleed rate and set point controls. Korotkoff sound signals from a microphone in the blood pressure cuff (not part of the system) provide decision information to the digital control system. The system completed a series of engineering tests using simulated Korotkoff sound inputs. The system performed successfully in all cases and was stable over an extended period of time.

  12. A Last Glacial Maximum world-ocean simulation at eddy-permitting resolution - Part 1: Experimental design and basic evaluation

    NASA Astrophysics Data System (ADS)

    Ballarotta, M.; Brodeau, L.; Brandefelt, J.; Lundberg, P.; Döös, K.

    2013-01-01

    Most state-of-the-art climate models include a coarsely resolved oceanic component, which has difficulties in capturing detailed dynamics, and therefore eddy-permitting/eddy-resolving simulations have been developed to reproduce the observed World Ocean. In this study, an eddy-permitting numerical experiment is conducted to simulate the global ocean state for a period of the Last Glacial Maximum (LGM, ~ 26 500 to 19 000 yr ago) and to investigate the improvements due to taking into account these higher spatial scales. The ocean general circulation model is forced by a 49-yr sample of LGM atmospheric fields constructed from a quasi-equilibrated climate-model simulation. The initial state and the bottom boundary condition conform to the Paleoclimate Modelling Intercomparison Project (PMIP) recommendations. Before evaluating the model efficiency in representing the paleo-proxy reconstruction of the surface state, the LGM experiment is in this first part of the investigation, compared with a present-day eddy-permitting hindcast simulation as well as with the available PMIP results. It is shown that the LGM eddy-permitting simulation is consistent with the quasi-equilibrated climate-model simulation, but large discrepancies are found with the PMIP model analyses, probably due to the different equilibration states. The strongest meridional gradients of the sea-surface temperature are located near 40° N and S, this due to particularly large North-Atlantic and Southern-Ocean sea-ice covers. These also modify the locations of the convection sites (where deep-water forms) and most of the LGM Conveyor Belt circulation consequently takes place in a thinner layer than today. Despite some discrepancies with other LGM simulations, a glacial state is captured and the eddy-permitting simulation undertaken here yielded a useful set of data for comparisons with paleo-proxy reconstructions.

  13. Draft Permit & Supporting Documentation for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit)

    EPA Pesticide Factsheets

    List of draft permit & supporting documentation for the Cape Wind Associates, LLC, Horseshoe Shoal, Nantucket Sound (Offshore Renewable Energy Project/OCS Air Permit: Massachusetts Plan Approval including nonattainment NSR Appendix A requirements).

  14. Criteria for asphalt-rubber concrete in civil airport pavements: Mixture design

    NASA Astrophysics Data System (ADS)

    Roberts, F. L.; Lytton, R. L.; Hoyt, D.

    1986-07-01

    A mixture design procedure is developed to allow the use of asphalt-rubber binders in concrete for flexible airport pavement. The asphalt-rubber is produced by reacting asphalt with ground, scrap tire rubber to produce the binder for the asphalt-rubber concrete. Procedures for laboratory preparation of alsphalt-rubber binders using an equipment setup that was found by researchers to produce laboratory binders with similar properties to field processes are included. The rubber-asphalt concrete mixture design procedure includes adjustments to the aggregate gradation to permit space for the rubber particles in the asphalt-rubber binder as well as suggested mixing and compaction temperatures, and compaction efforts. While the procedure was used in the laboratory to successfully produce asphalt-rubber concrete mixtures, it should be evaluated in the field to ensure that consistent results can be achieved in a production environment.

  15. A study of bankfull culvert design effectiveness.

    DOT National Transportation Integrated Search

    2011-06-01

    As part of the certification under the Clean Water Act 404 Nationwide Permit, the Ohio EPA mandated that the Ohio DOT install bankfull culverts in all new culvert installations subject to the permit. In addition, by embedding the culvert, the bottom ...

  16. 40 CFR 180.31 - Temporary tolerances.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... seeking an experimental permit for a pesticide chemical under the Federal Insecticide, Fungicide, and... period designed to allow the orderly marketing of the raw agricultural commodities produced while testing a pesticide chemical under an experimental permit issued under authority of the Federal Insecticide...

  17. 40 CFR 180.31 - Temporary tolerances.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... seeking an experimental permit for a pesticide chemical under the Federal Insecticide, Fungicide, and... period designed to allow the orderly marketing of the raw agricultural commodities produced while testing a pesticide chemical under an experimental permit issued under authority of the Federal Insecticide...

  18. 40 CFR 180.31 - Temporary tolerances.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... seeking an experimental permit for a pesticide chemical under the Federal Insecticide, Fungicide, and... period designed to allow the orderly marketing of the raw agricultural commodities produced while testing a pesticide chemical under an experimental permit issued under authority of the Federal Insecticide...

  19. 40 CFR 180.31 - Temporary tolerances.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... seeking an experimental permit for a pesticide chemical under the Federal Insecticide, Fungicide, and... period designed to allow the orderly marketing of the raw agricultural commodities produced while testing a pesticide chemical under an experimental permit issued under authority of the Federal Insecticide...

  20. 40 CFR 180.31 - Temporary tolerances.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... seeking an experimental permit for a pesticide chemical under the Federal Insecticide, Fungicide, and... period designed to allow the orderly marketing of the raw agricultural commodities produced while testing a pesticide chemical under an experimental permit issued under authority of the Federal Insecticide...

  1. Design and installation of a next generation pilot scale fermentation system.

    PubMed

    Junker, B; Brix, T; Lester, M; Kardos, P; Adamca, J; Lynch, J; Schmitt, J; Salmon, P

    2003-01-01

    Four new fermenters were designed and constructed for use in secondary metabolite cultivations, bioconversions, and enzyme production. A new PC/PLC-based control system also was implemented using GE Fanuc PLCs, Genius I/O blocks, and Fix Dynamics SCADA software. These systems were incorporated into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Details of the design of these new fermenters and the new control system are described and compared with the existing installation for expected effectiveness. In addition, the reasoning behind selection of some of these features has been included. Key to the design was the goal of preserving similarity between the new and previously existing and successfully utilized fermenter hardware and software installations where feasible but implementing improvements where warranted and beneficial. Examples of enhancements include strategic use of Inconel as a material of construction to reduce corrosion, piping layout design for simplified hazardous energy isolation, on-line calculation and control of nutrient feed rates, and the use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation.

  2. Large-Scale Physical Models of Thermal Remediation of DNAPL Source Zones in Aquitards

    DTIC Science & Technology

    2009-05-01

    pressure at the bottom of the tank. The higher pressure is reflected in higher measured water levels in external gauges . Figure 63: 3D Cross...than atmospheric. This higher pressure can raise the apparent water level in a sight gauge or external overflow and can even drive more fluid through...the water table. All met or exceeded their goals. Typical turnkey unit costs (including design, permitting, fabrication, mobilization, drilling

  3. Motorized control for mirror mount apparatus

    DOEpatents

    Cutburth, Ronald W.

    1989-01-01

    A motorized control and automatic braking system for adjusting mirror mount apparatus is disclosed. The motor control includes a planetary gear arrangement to provide improved pitch adjustment capability while permitting a small packaged design. The motor control for mirror mount adjustment is suitable for laser beam propagation applications. The brake is a system of constant contact, floating detents which engage the planetary gear at selected between-teeth increments to stop rotation instantaneously when the drive motor stops.

  4. Maximum life spiral bevel reduction design

    NASA Technical Reports Server (NTRS)

    Savage, M.; Prasanna, M. G.; Coe, H. H.

    1992-01-01

    Optimization is applied to the design of a spiral bevel gear reduction for maximum life at a given size. A modified feasible directions search algorithm permits a wide variety of inequality constraints and exact design requirements to be met with low sensitivity to initial values. Gear tooth bending strength and minimum contact ratio under load are included in the active constraints. The optimal design of the spiral bevel gear reduction includes the selection of bearing and shaft proportions in addition to gear mesh parameters. System life is maximized subject to a fixed back-cone distance of the spiral bevel gear set for a specified speed ratio, shaft angle, input torque, and power. Significant parameters in the design are: the spiral angle, the pressure angle, the numbers of teeth on the pinion and gear, and the location and size of the four support bearings. Interpolated polynomials expand the discrete bearing properties and proportions into continuous variables for gradient optimization. After finding the continuous optimum, a designer can analyze near optimal designs for comparison and selection. Design examples show the influence of the bearing lives on the gear parameters in the optimal configurations. For a fixed back-cone distance, optimal designs with larger shaft angles have larger service lives.

  5. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  6. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  7. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  8. 7 CFR 360.303 - Approval of an application for a permit to move a noxious weed; conditions specified in permit.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... noxious weed; conditions specified in permit. 360.303 Section 360.303 Agriculture Regulations of the... NOXIOUS WEED REGULATIONS § 360.303 Approval of an application for a permit to move a noxious weed... noxious weed. If the application is approved, the Administrator will issue the permit including any...

  9. Computational and design methods for advanced imaging

    NASA Astrophysics Data System (ADS)

    Birch, Gabriel C.

    This dissertation merges the optical design and computational aspects of imaging systems to create novel devices that solve engineering problems in optical science and attempts to expand the solution space available to the optical designer. This dissertation is divided into two parts: the first discusses a new active illumination depth sensing modality, while the second part discusses a passive illumination system called plenoptic, or lightfield, imaging. The new depth sensing modality introduced in part one is called depth through controlled aberration. This technique illuminates a target with a known, aberrated projected pattern and takes an image using a traditional, unmodified imaging system. Knowing how the added aberration in the projected pattern changes as a function of depth, we are able to quantitatively determine depth of a series of points from the camera. A major advantage this method permits is the ability for illumination and imaging axes to be coincident. Plenoptic cameras capture both spatial and angular data simultaneously. This dissertation present a new set of parameters that permit the design and comparison of plenoptic devices outside the traditionally published plenoptic 1.0 and plenoptic 2.0 configurations. Additionally, a series of engineering advancements are presented, including full system raytraces of raw plenoptic images, Zernike compression techniques of raw image files, and non-uniform lenslet arrays to compensate for plenoptic system aberrations. Finally, a new snapshot imaging spectrometer is proposed based off the plenoptic configuration.

  10. 40 CFR 70.8 - Permit review by EPA and affected States.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements...) Transmission of information to the Administrator. (1) The permit program shall require that the permitting authority provide to the Administrator a copy of each permit application (including any application for...

  11. 40 CFR 70.8 - Permit review by EPA and affected States.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements...) Transmission of information to the Administrator. (1) The permit program shall require that the permitting authority provide to the Administrator a copy of each permit application (including any application for...

  12. 40 CFR 70.8 - Permit review by EPA and affected States.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements...) Transmission of information to the Administrator. (1) The permit program shall require that the permitting authority provide to the Administrator a copy of each permit application (including any application for...

  13. 40 CFR 70.8 - Permit review by EPA and affected States.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements...) Transmission of information to the Administrator. (1) The permit program shall require that the permitting authority provide to the Administrator a copy of each permit application (including any application for...

  14. 40 CFR 70.8 - Permit review by EPA and affected States.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... compatible with EPA's national database management system. (2) The Administrator may waive the requirements...) Transmission of information to the Administrator. (1) The permit program shall require that the permitting authority provide to the Administrator a copy of each permit application (including any application for...

  15. 40 CFR 122.45 - Calculating NPDES permit conditions (applicable to State NPDES programs, see § 123.25).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.45 Calculating NPDES permit conditions..., and prohibitions, including those necessary to achieve water quality standards, shall unless...

  16. Food and waste management biotechnology for the space shuttle

    NASA Technical Reports Server (NTRS)

    Murray, R. W.; Schelkopf, J. D.; Hunt, S. R.; Sauer, R. L.

    1979-01-01

    Space-crew facilities for preparation, eating, personal hygiene and waste management are contained in one small area of the Shuttle Orbiter Mid-Deck, all the functional systems being interconnected. The paper discusses three major systems: (1) the Galley, which includes the personal hygiene station and food packages; (2) the Waste Collector, which includes provisions for male and female users, urine, feces and emesis collection in both a normal and contigency mode of operation; and (3) Biowaste Monitoring, which includes mass measurement and sampling. The technology improvement continues by assuring that the Orbiter systems have sufficient design flexibility to permit later improvements in operation and in function.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sager, P.H.

    Studies were carried out on the FED Baseline to improve design definition, establish feasibility, and reduce cost. Emphasis was placed on cost reduction, but significant feasibility concerns existed in several areas, and better design definition was required to establish feasibility and provide a better basis for cost estimates. Design definition and feasibility studies included the development of a labyrinth shield ring concept to prevent radiation streaming between the torus spool and the TF coil cryostat. The labyrinth shield concept which was developed reduced radiation streaming sufficiently to permit contact maintenance of the inboard EF coils. Various concepts of preventing arcingmore » between adjacent shield sectors were also explored. It was concluded that installation of copper straps with molybdenum thermal radiation shields would provide the most reliable means of preventing arcing. Other design studies included torus spool electrical/structural concepts, test module shielding, torus seismic response, poloidal conditions in the magnets, disruption characteristics, and eddy current effects. These additional studies had no significant impact on cost but did confirm the feasibility of the basic FED Baseline concept.« less

  18. Experimental Flow Models for SSME Flowfield Characterization

    NASA Technical Reports Server (NTRS)

    Abel, L. C.; Ramsey, P. E.

    1989-01-01

    Full scale flow models with extensive instrumentation were designed and manufactured to provide data necessary for flow field characterization in rocket engines of the Space Shuttle Main Engine (SSME) type. These models include accurate flow path geometries from the pre-burner outlet through the throat of the main combustion chamber. The turbines are simulated with static models designed to provide the correct pressure drop and swirl for specific power levels. The correct turbopump-hot gas manifold interfaces were designed into the flow models to permit parametric/integration studies for new turbine designs. These experimental flow models provide a vehicle for understanding the fluid dynamics associated with specific engine issues and also fill the more general need for establishing a more detailed fluid dynamic base to support development and verification of advanced math models.

  19. Trench fast reactor design using the microcomputer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rohach, A.F.; Sankoorikal, J.T.; Schmidt, R.R.

    1987-01-01

    This project is a study of alternative liquid-metal-cooled fast power reactor system concepts. Specifically, an unconventional primary system is being conceptually designed and evaluated. The project design is based primarily on microcomputer analysis through the use of computational modules. The reactor system concept is a long, narrow pool with a long, narrow reactor called a trench-type pool reactor in it. The reactor consists of five core-blanket modules in a line. Specific power is to be modest, permitting long fuel residence time. Two fuel cycles are currently being considered. The reactor design philosophy is that of the inherently safe concept. Thismore » requires transient analysis dependent on reactivity coefficients: prompt fuel, including Doppler and expansion, fuel expansion, sodium temperature and void, and core expansion. Conceptual reactor design is done on a microcomputer. A part of the trench reactor project is to develop a microcomputer-based system that can be used by the user for scoping studies and design. Current development includes the neutronics and fuel management aspects of the design. Thermal-hydraulic analysis and economics are currently being incorporated into the microcomputer system. The system is menu-driven including preparation of program input data and of output data for displays in graphics form.« less

  20. Report: EPA’s Management of Interim Status Permitting Needs Improvement to Ensure Continued Progress

    EPA Pesticide Factsheets

    Report #2007-P-00005, December 4, 2006. Interim status is a temporary designation, but some units have existed for as many as 25 years without formal issuance or denial of a permit, or other regulatory controls.

  1. An overview of NASA research on positive displacement general-aviation engines

    NASA Technical Reports Server (NTRS)

    Kempke, E. E., Jr.

    1980-01-01

    The research and technology program related to improved and advanced general aviation engines is described. Current research is directed at the near-term improvement of conventional air-cooled spark-ignition piston engines and at future alternative engine systems based on all-new spark-ignition piston engines, lightweight diesels, and rotary combustion engines that show potential for meeting program goals in the midterm and long-term future. The conventional piston engine activities involve efforts on applying existing technology to improve fuel economy, investigation of key processes to permit leaner operation and reduce drag, and the development of cost effective technology to permit flight at high-altitudes where fuel economy and safety are improved. The advanced engine concepts activities include engine conceptual design studies and enabling technology efforts on the critical or key technology items.

  2. Triaxial thermopile array geo-heat-flow sensor

    DOEpatents

    Carrigan, Charles R.; Hardee, Harry C.; Reynolds, Gerald D.; Steinfort, Terry D.

    1992-01-01

    A triaxial thermopile array geothermal heat flow sensor is designed to measure heat flow in three dimensions in a reconstituted or unperturbed subsurface regime. Heat flow can be measured in conductive or permeable convective media. The sensor may be encased in protective pvc tubing and includes a plurality of thermistors and an array of heat flow transducers arranged in a vertical string. The transducers produce voltage proportional to heat flux along the subsurface regime and permit direct measurement of heat flow in the subsurface regime. The presence of the thermistor array permits a comparison to be made between the heat flow estimates obtained from the transducers and heat flow calculated using temperature differences and Fourier's Law. The device is extremely sensitive with an accuracy of less than 0.1 Heat Flow Units (HFU) and may be used for long term readings.

  3. Los Angeles Area Permit Holder Estimated Trash Load Reduction

    EPA Pesticide Factsheets

    The Los Angeles River has been designated as an impaired waterbody due to the large volume of trash it receives from the watershed. To address this problem a Total Maximum Daily Load (TMDL), which establishes baseline trash loads to the river from the watershed, has been incorporated into the area stormwater permit. The permit requires each permittee to implement trash reduction measures for discharges through the storm drain system with an emphasis on the installation of full capture devices. The stormwater permit incorporates progressive reductions in trash discharges to the Los Angeles River, reaching a zero level in 2016.

  4. 77 FR 60459 - Notice of Proposed Information Collection; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... renewed approval for the collection of information for permits and permit processing. This information collection will also seek approval to collect permit processing fees approved under OSM regulations. DATES... and permit processing. OSM is including in this collection a request for OMB approval to collect...

  5. 50 CFR 21.29 - Falconry standards and falconry permitting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.29...-caught, captive-bred, or hybrid raptors protected under the MBTA to use in falconry. (ii) The Bald and..., you must transfer all raptors (including captive-bred raptors) held under permits from the State...

  6. 50 CFR 21.29 - Falconry standards and falconry permitting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.29...-caught, captive-bred, or hybrid raptors protected under the MBTA to use in falconry. (ii) The Bald and..., you must transfer all raptors (including captive-bred raptors) held under permits from the State...

  7. 50 CFR 21.29 - Falconry standards and falconry permitting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.29...-caught, captive-bred, or hybrid raptors protected under the MBTA to use in falconry. (ii) The Bald and..., you must transfer all raptors (including captive-bred raptors) held under permits from the State...

  8. 50 CFR 21.29 - Falconry standards and falconry permitting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.29...-caught, captive-bred, or hybrid raptors protected under the MBTA to use in falconry. (ii) The Bald and... the 2 years, you must transfer all raptors (including captive-bred raptors) held under permits from...

  9. 50 CFR 21.29 - Falconry standards and falconry permitting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... IMPORTATION OF WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.29...-caught, captive-bred, or hybrid raptors protected under the MBTA to use in falconry. (ii) The Bald and..., you must transfer all raptors (including captive-bred raptors) held under permits from the State...

  10. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  11. 40 CFR 72.50 - General.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REGULATION Acid Rain Permit Contents § 72.50 General. (a) Each Acid Rain permit (including any draft or proposed Acid Rain permit) will contain the following elements in a format prescribed by the Administrator: (1) All elements required for a complete Acid Rain permit application under § 72.31 of this part, as...

  12. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  13. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  14. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  15. 40 CFR 72.50 - General.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REGULATION Acid Rain Permit Contents § 72.50 General. (a) Each Acid Rain permit (including any draft or proposed Acid Rain permit) will contain the following elements in a format prescribed by the Administrator: (1) All elements required for a complete Acid Rain permit application under § 72.31 of this part, as...

  16. 40 CFR 72.50 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REGULATION Acid Rain Permit Contents § 72.50 General. (a) Each Acid Rain permit (including any draft or proposed Acid Rain permit) will contain the following elements in a format prescribed by the Administrator: (1) All elements required for a complete Acid Rain permit application under § 72.31 of this part, as...

  17. 40 CFR 72.50 - General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REGULATION Acid Rain Permit Contents § 72.50 General. (a) Each Acid Rain permit (including any draft or proposed Acid Rain permit) will contain the following elements in a format prescribed by the Administrator: (1) All elements required for a complete Acid Rain permit application under § 72.31 of this part, as...

  18. 40 CFR 72.50 - General.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REGULATION Acid Rain Permit Contents § 72.50 General. (a) Each Acid Rain permit (including any draft or proposed Acid Rain permit) will contain the following elements in a format prescribed by the Administrator: (1) All elements required for a complete Acid Rain permit application under § 72.31 of this part, as...

  19. 40 CFR 72.70 - Relationship to title V operating permit program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) PERMITS REGULATION Acid Rain Phase II Implementation § 72.70 Relationship to... operating permit programs and acceptance of State Acid Rain programs, the procedure for including State Acid... of an accepted State program, to issue Phase II Acid Rain permits. (b) Relationship to operating...

  20. 50 CFR 635.32 - Specifically authorized activities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to fish for, take, retain, or possess Atlantic sharks, including sandbar sharks, in excess of the... permit, display permit, chartering permit, or shark research permit issued in response to requests for... landed or retained under the authority of this section is subject to a quota, the fish shall be counted...

  1. 50 CFR 635.32 - Specifically authorized activities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to fish for, take, retain, or possess Atlantic sharks, including sandbar sharks, in excess of the... permit, display permit, chartering permit, or shark research permit issued in response to requests for... landed or retained under the authority of this section is subject to a quota, the fish shall be counted...

  2. IMCS reflight certification requirements and design specifications

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The requirements for reflight certification are established. Software requirements encompass the software programs that are resident in the PCC, DEP, PDSS, EC, or any related GSE. A design approach for the reflight software packages is recommended. These designs will be of sufficient detail to permit the implementation of reflight software. The PDSS/IMC Reflight Certification system provides the tools and mechanisms for the user to perform the reflight certification test procedures, test data capture, test data display, and test data analysis. The system as defined will be structured to permit maximum automation of reflight certification procedures and test data analysis.

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flanigan, Tom; Pybus, Craig; Roy, Sonya

    This report summarizes the results of the Pre-Front End Engineering Design (pre-FEED) phase of a proposed advanced oxy-combustion power generation plant to repower the existing 200 MWe Unit 4 at Ameren Energy Resources’ (AER) Meredosia Power Plant. AER has formed an alliance with Air Liquide Process and Construction, Inc. (ALPC) and Babcock & Wilcox Power Generation Group (B&W PGG) for the design, construction, and testing of the facility, and has contracted with URS Corporation (URS) for preliminary design and Owner’s engineering services. The Project employs oxy-combustion technology – combustion of coal with nearly pure oxygen and recycled flue gas (insteadmore » of air) – to capture approximately 90% of the flue gas CO2 for transport and sequestration by another Project. Plant capacity and configuration has been developed based on the B&W PGG-ALPC cool recycle process firing high-sulfur bituminous coal fuel, assuming baseload plant operation to maximize existing steam turbine capability, with limited consideration for plant redundancy and performance optimization in order to keep plant costs as low as practical. Activities and preliminary results from the pre-FEED phase addressed in this report include the following: Overall plant thermal performance; Equipment sizing and system configuration; Plant operation and control philosophy; Plant emissions and effluents; CO 2 production and recovery characteristics; Project cost estimate and economic evaluation; Integrated project engineering and construction schedule; Project risk and opportunity assessment; Development of Project permitting strategy and requirements During the Phase 2 of the Project, additional design details will be developed and the Phase 1 work products updated to support actual construction and operation of the facility in Phase 3. Additional information will be provided early in Phase 2 to support Ameren-Environmental in finalizing the appropriate permitting strategies and permit applications. Additional performance and reliability enhancements will also be evaluated in Phase 2 to try to improve overall project economics.« less

  4. The Navy/NASA Engine Program (NNEP89): Interfacing the program for the calculation of complex Chemical Equilibrium Compositions (CEC)

    NASA Technical Reports Server (NTRS)

    Gordon, Sanford

    1991-01-01

    The NNEP is a general computer program for calculating aircraft engine performance. NNEP has been used extensively to calculate the design and off-design (matched) performance of a broad range of turbine engines, ranging from subsonic turboprops to variable cycle engines for supersonic transports. Recently, however, there has been increased interest in applications for which NNEP is not capable of simulating, such as the use of alternate fuels including cryogenic fuels and the inclusion of chemical dissociation effects at high temperatures. To overcome these limitations, NNEP was extended by including a general chemical equilibrium method. This permits consideration of any propellant system and the calculation of performance with dissociation effects. The new extended program is referred to as NNEP89.

  5. Advanced Turbine Technology Applications Project (ATTAP)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    ATTAP activities during the past year included test-bed engine design and development, ceramic component design, materials and component characterization, ceramic component process development and fabrication, ceramic component rig testing, and test-bed engine fabrication and testing. Significant technical challenges remain, but all areas exhibited progress. Test-bed engine design and development included engine mechanical design, combustion system design, alternate aerodynamic designs of gasifier scrolls, and engine system integration aimed at upgrading the AGT-5 from a 1038 C (1900 F) metal engine to a durable 1372 C (2500 F) structural ceramic component test-bed engine. ATTAP-defined ceramic and associated ceramic/metal component design activities completed include the ceramic gasifier turbine static structure, the ceramic gasifier turbine rotor, ceramic combustors, the ceramic regenerator disk, the ceramic power turbine rotors, and the ceramic/metal power turbine static structure. The material and component characterization efforts included the testing and evaluation of seven candidate materials and three development components. Ceramic component process development and fabrication proceeded for the gasifier turbine rotor, gasifier turbine scroll, gasifier turbine vanes and vane platform, extruded regenerator disks, and thermal insulation. Component rig activities included the development of both rigs and the necessary test procedures, and conduct of rig testing of the ceramic components and assemblies. Test-bed engine fabrication, testing, and development supported improvements in ceramic component technology that permit the achievement of both program performance and durability goals. Total test time in 1991 amounted to 847 hours, of which 128 hours were engine testing, and 719 were hot rig testing.

  6. Ocean Disposal of Marine Mammal Carcasses

    EPA Pesticide Factsheets

    Ocean dumping of marine mammal carcasses is allowed with a permit issued by EPA under the Marine Protection, Research and Sanctuaries Act. Includes permit information, potential environmental impacts, and instructions for getting the general permit.

  7. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  8. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  9. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  10. 32 CFR 767.9 - Content of permit holder's final report.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RULES APPLICATION GUIDELINES FOR ARCHEOLOGICAL RESEARCH PERMITS ON SHIP AND AIRCRAFT WRECKS UNDER THE... survey and/or excavation process; and (h) An evaluation of the completed permitted activity that includes...

  11. 50 CFR 648.5 - Operator permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... portion of the Skate Management Unit; or Atlantic deep-sea red crab harvested in or from the EEZ portion of the Red Crab Management Unit, issued a permit, including carrier and processing permits, for these...

  12. 50 CFR 21.23 - Scientific collecting permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... scientific, or educational institution designated in the permit application within 60 days following the date...

  13. 50 CFR 21.23 - Scientific collecting permits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... scientific, or educational institution designated in the permit application within 60 days following the date...

  14. 50 CFR 21.23 - Scientific collecting permits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... scientific, or educational institution designated in the permit application within 60 days following the date...

  15. 36 CFR 30.2 - General provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... uses, and the location, design and scope of any new developments, permitted under the regulations in..., no additional or increased commercial or industrial uses are permitted within these districts. Any existing nonconforming commercial or industrial uses shall be discontinued within 10 years from the date of...

  16. 78 FR 48201 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 (Pub. L. 95-541)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... establishment of a permit system for various activities in Antarctica and designation of certain animals and... mammals at breeding, molting, and terrestrial, fast-ice, and sea-ice haul-out sites at various sub...

  17. 40 CFR 71.25 - Permit content.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... permit does not convey any property rights of any sort, or any exclusive privilege; and (v) The permittee... enforce the emission trades; and (v) The early reductions source owner or operator provides the... submitted to the Administrator or the Administrator's designated agent; and (v) Such additional requirements...

  18. HANDBOOK: GUIDE TO TECHNICAL RESOURCES FOR THE DESIGN OF LAND DISPOSAL FACILITIES

    EPA Science Inventory

    This Handbook facilitates the preparation and processing of land disposal permit applications. It directs the regulated community and the regulators to the appropriate EPA technical resource documents, as they prepare or review permits required under PL 480 (RCRA). Topics discuss...

  19. Proceedings: 1990 EPRI gas turbine procurement seminar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McDonald, B.L.; Miller, M.N.

    1991-06-01

    This seminar presents information that enables utilities to implement more cost-effective procurements for gas turbine and combined-cycle power generation equipment. A systematic approach to specification and permitting procedures can lower unit life-cycle cost. APPROACH. Thirty-two staff members from 25 utilities met in Danvers, Massachusetts, October 9--11, 1990. Speakers representing utilities, vendors, and EPRI contractors presented material on recent procurement and startup experiences, permitting considerations, specification strategy, bid evaluation techniques, and a vendor's perspective of utility procurements. KEY POINTS. The seminar focused on specification features, procurement procedures, and bid evaluation techniques designed to implement life-cycle cost-effective procurement consistent with the plantmore » mission. Speakers highlighted the following issues: Experiential case histories of recent procurements and startups, emphasizing how to design procurement procedures that improve plant operating economics; Current trends in permitting for NO{sub x} compliance and recent permitting experience; Quantifiable evaluations of vendors' bids for RAM-related characteristics; The means to obtain specifically desired but nonstandard equipment features.« less

  20. Electrode-shaping for the excitation and detection of permitted arbitrary modes in arbitrary geometries in piezoelectric resonators.

    PubMed

    Pulskamp, Jeffrey S; Bedair, Sarah S; Polcawich, Ronald G; Smith, Gabriel L; Martin, Joel; Power, Brian; Bhave, Sunil A

    2012-05-01

    This paper reports theoretical analysis and experimental results on a numerical electrode shaping design technique that permits the excitation of arbitrary modes in arbitrary geometries for piezoelectric resonators, for those modes permitted to exist by the nonzero piezoelectric coefficients and electrode configuration. The technique directly determines optimal electrode shapes by assessing the local suitability of excitation and detection electrode placement on two-port resonators without the need for iterative numerical techniques. The technique is demonstrated in 61 different electrode designs in lead zirconate titanate (PZT) thin film on silicon RF micro electro-mechanical system (MEMS) plate, beam, ring, and disc resonators for out-of-plane flexural and various contour modes up to 200 MHz. The average squared effective electromechanical coupling factor for the designs was 0.54%, approximately equivalent to the theoretical maximum value of 0.53% for a fully electroded length-extensional mode beam resonator comprised of the same composite. The average improvement in S(21) for the electrode-shaped designs was 14.6 dB with a maximum improvement of 44.3 dB. Through this piezoelectric electrodeshaping technique, 95% of the designs showed a reduction in insertion loss.

  1. solar thermal power systems advanced solar thermal technology project, advanced subsystems development

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The preliminary design for a prototype small (20 kWe) solar thermal electric generating unit was completed, consisting of several subsystems. The concentrator and the receiver collect solar energy and a thermal buffer storage with a transport system is used to provide a partially smoothed heat input to the Stirling engine. A fossil-fuel combustor is included in the receiver designs to permit operation with partial or no solar insolation (hybrid). The engine converts the heat input into mechanical action that powers a generator. To obtain electric power on a large scale, multiple solar modules will be required to operate in parallel. The small solar electric power plant used as a baseline design will provide electricity at remote sites and small communities.

  2. Wavelength Detuning Cross-Beam Energy Transfer Mitigation Scheme for Direct-Drive: Modeling and Evidence from National Ignition Facility Implosions

    NASA Astrophysics Data System (ADS)

    Marozas, J. A.

    2017-10-01

    Cross-beam energy transfer (CBET) has been shown to significantly reduce the laser absorption and implosion speed in direct-drive implosion experiments on OMEGA and the National Ignition Facility (NIF). Mitigating CBET assists in achieving ignition-relevant hot-spot pressures in deuterium-tritium cryogenic OMEGA implosions. In addition, reducing CBET permits lower, more hydrodynamically stable, in-flight aspect ratio ignition designs with smaller nonuniformity growth during the acceleration phase. Detuning the wavelengths of the crossing beams is one of several techniques under investigation at the University of Rochester to mitigate CBET. This talk will describe these techniques with an emphasis on wavelength detuning. Recent experiments designed and predicted using multidimensional hydrodynamic simulations including CBET on the NIF have exploited the wavelength arrangement of the NIF beam geometry to demonstrate CBET mitigation through wavelength detuning in polar-direct-drive (PDD) implosions. Shapes and trajectories inferred from time-resolved x-ray radiography of the imploding shell, scattered-light spectra, and hard x-ray spectra generated by suprathermal electrons all indicate a reduction in CBET. These results and their implications for direct-drive ignition will be presented and discussed. In addition, hydrodynamically scaled ignition-relevant designs for OMEGA implosions exploiting wavelength detuning will be presented. Changes required to the OMEGA laser to permit wavelength detuning will be discussed. Future plans for PDD on the NIF including more-uniform implosions with CBET mitigation will be explored. This material is based upon work supported by the Department of Energy National Nuclear Security Administration under Award Number DE-NA0001944.

  3. 77 FR 47380 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges From...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... permit. Major changes also include definition of ``operator'', acute toxicity test for produced water... Category as authorized by section 402 of the Clean Water Act, (CWA). This permit renewal authorizes... considered all comments received and makes few changes to the proposed permit: pH limit for formation test...

  4. 75 FR 4581 - Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ...] Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With Phosphate Mining in... (Aphelocoma coerulescens)--occupied habitat incidental to land clearing and phosphate mining in Manatee County... with phosphate mining which will result in the take of 100 ac of occupied scrub-jay habitat, including...

  5. 75 FR 38831 - Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ...] Endangered [and Threatened] Wildlife and Plants; Permit(s); Land Clearing Associated With Phosphate Mining in... (Aphelocoma coerulescens)-occupied habitat incidental to land clearing and phosphate mining in Manatee County... with phosphate mining which will result in the take of 75 ac of occupied scrub-jay habitat, including...

  6. Box Cello Middle School Science Clubs

    NASA Astrophysics Data System (ADS)

    Vandegrift, Guy

    1998-10-01

    The Box Cello is a middle school science club which is attempting to (1) understand the cello and (2) design a low-cost starter instrument. We can support and justify this research by adding a third goal: (3) to help supply local science classes with equipment. My policy of spending one entire day each week away from the university, out in a local school is essential to this project. This schedule also permits me to conduct lessons on optics and music in the schools. And, it permits circulation of tools and equipment. A simple calculation demonstrates the great economy achieved by combining science clubs with academic year school visits. Consider the cost of letting 10,000 students in 10 middle schools each learn about and play with a pair of "upside-down" glasses for one hour. A visit to each school for three consecutive weeks would easily permit such a circulation if only 30 pairs were constructed. Assume rhetorically, that the construction of 30 pairs of glasses were to consume the entire estimated annual budget of $100,000. The cost per student would be only ten dollars! The visits, guest lectures, and equipment loans permit informal networking (including lunch) with math, science and music teachers in 10 schools. For more information, visit the http://www.utep.edu/boxcello/

  7. Investigations of Air-cooled Turbine Rotors for Turbojet Engines II : Mechanical Design, Stress Analysis, and Burst Test of Modified J33 Split-disk Rotor / Richard H. Kemp and Merland L. Moseson

    NASA Technical Reports Server (NTRS)

    Kemp, Richard H; Moseson, Merland L

    1952-01-01

    A full-scale J33 air-cooled split turbine rotor was designed and spin-pit tested to destruction. Stress analysis and spin-pit results indicated that the rotor in a J33 turbojet engine, however, showed that the rear disk of the rotor operated at temperatures substantially higher than the forward disk. An extension of the stress analysis to include the temperature difference between the two disks indicated that engine modifications are required to permit operation of the two disks at more nearly the same temperature level.

  8. Quick-Connect Nut

    NASA Technical Reports Server (NTRS)

    1999-01-01

    Marshall Space Flight Center (MSFC) has developed a specially-designed nut, called the Quick-Connect Nut, for quick and easy assembly of components in the harsh environment of space, as in assembly of International Space Station. The design permits nuts to be installed simply by pushing them onto standard bolts, then giving a quick twist. To remove, they are unscrewed like conventional nuts. Possible applications include the mining industry for erecting support barriers, assembling underwater oil drilling platforms, fire-fighting equipment, scaffolding, assembly-line machinery, industrial cranes, and even changing lug nuts on race cars. The speed of assembly can make the difference between life and death in different aspects of life on Earth.

  9. Benefit from NASA

    NASA Image and Video Library

    1999-10-12

    Marshall Space Flight Center (MSFC) has developed a specially-designed nut, called the Quick-Connect Nut, for quick and easy assembly of components in the harsh environment of space, as in assembly of International Space Station. The design permits nuts to be installed simply by pushing them onto standard bolts, then giving a quick twist. To remove, they are unscrewed like conventional nuts. Possible applications include the mining industry for erecting support barriers, assembling underwater oil drilling platforms, fire-fighting equipment, scaffolding, assembly-line machinery, industrial cranes, and even changing lug nuts on race cars. The speed of assembly can make the difference between life and death in different aspects of life on Earth.

  10. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  11. Some Impacts of Risk-Centric Certification Requirements for UAS

    NASA Technical Reports Server (NTRS)

    Neogi, Natasha A. (Inventor); Hayhurst, Kelly J.; Maddalon, Jeffrey M.; Verstynen, Harry A.

    2016-01-01

    This paper discusses results from a recent study that investigates certification requirements for an unmanned rotorcraft performing agricultural application operations. The process of determining appropriate requirements using a risk-centric approach revealed a number of challenges that could impact larger UAS standardization efforts. Fundamental challenges include selecting the correct level of abstraction for requirements to permit design flexibility, transforming human-centric operational requirements to aircraft airworthiness requirements, and assessing all hazards associated with the operation.

  12. 50 CFR 17.52 - Permits-similarity of appearance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... species designated as Endangered or Threatened due to its similarity of appearance. Such a permit may... information: Documentary evidence, sworn affidavits, or other information to show species identification and the origin of the wildlife or plant in question. This information may be in the form of hunting...

  13. 50 CFR 17.52 - Permits-similarity of appearance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... species designated as Endangered or Threatened due to its similarity of appearance. Such a permit may... information: Documentary evidence, sworn affidavits, or other information to show species identification and the origin of the wildlife or plant in question. This information may be in the form of hunting...

  14. 50 CFR 17.52 - Permits-similarity of appearance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... species designated as Endangered or Threatened due to its similarity of appearance. Such a permit may... information: Documentary evidence, sworn affidavits, or other information to show species identification and the origin of the wildlife or plant in question. This information may be in the form of hunting...

  15. 50 CFR 17.52 - Permits-similarity of appearance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... species designated as Endangered or Threatened due to its similarity of appearance. Such a permit may... information: Documentary evidence, sworn affidavits, or other information to show species identification and the origin of the wildlife or plant in question. This information may be in the form of hunting...

  16. 15 CFR 922.74 - Permit procedures and issuance criteria.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... COASTAL RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Channel Islands National Marine... under § 922.48 and this section. (b) The Director, at his or her sole discretion, may issue a permit...: (1) Is appropriate research designed to further understanding of Sanctuary resources and qualities...

  17. The hub-and-spoke organization design: an avenue for serving patients well.

    PubMed

    Elrod, James K; Fortenberry, John L

    2017-07-11

    The healthcare industry is characterized by intensive, never-ending change occurring on a multitude of fronts. Success in such tumultuous environments requires healthcare providers to be proficient in myriad areas, including the manner in which they organize and deliver services. Less efficient designs drain precious resources and hamper efforts to deliver the best care possible to patients, making it imperative that optimal pathways are identified and pursued. One particular avenue that offers great potential for serving patients efficiently and effectively is known as the hub-and-spoke organization design. The hub-and-spoke organization design is a model which arranges service delivery assets into a network consisting of an anchor establishment (hub) which offers a full array of services, complemented by secondary establishments (spokes) which offer more limited service arrays, routing patients needing more intensive services to the hub for treatment. Hub-and-spoke networks afford many benefits for healthcare providers, but in order to capitalize fully, proper assembly is required. To advance awareness, knowledge, and use of the hub-and-spoke organization design, this article profiles Willis-Knighton Health System's service delivery network which has utilized the model for over three decades. Among other things, the hub-and-spoke organization design is defined, benefits are stipulated, and applications are discussed, permitting healthcare providers essential insights for the establishment and operation of these networks. The change-rich nature of the healthcare industry places a premium on incorporating advancements that permit health and medical providers to operate as optimally as possible. The hub-and-spoke organization design represents an option that, when deployed correctly, can greatly assist healthcare establishments in their quests to serve patients well.

  18. General Permits for Ocean Dumping

    EPA Pesticide Factsheets

    General permits are issued by EPA for the ocean dumping of certain materials that will have a minimal adverse environmental impact and are generally disposed of in small quantities. Information includes examples and ocean disposal sites for general permits

  19. SIMS prototype system 4: Design data brochure

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A pre-package prototype unit having domestic hot water and room solar heating capability that uses air as the collector fluid is described. This system is designed to be used with a small single-family dwelling where a roof mounted collector array is not feasible. The prototype unit is an assemble containing 203 square feet of effective collector surface with 113 cubic feet of rock storage. The design of structure and storage is modular, which permits expansion and reduction of the collector array and storage bed in 68 square feet and 37 cubic feet increments respectively. The system is designed to be transportable. This permitted assemble and certification testing in one area and installation in another area without tear down and reassemble. Design, installation, operation, performance and maintenance of this system are described.

  20. 78 FR 18429 - Cost Recovery for Permit Processing, Administration, and Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... costs on to the general public. DATES: Electronic or written comments: OSM will accept written comments... portion of the financial costs for reviewing, administering, and enforcing permits from the general public... general public.'' This charge is designed ``to recover the full cost to the Federal Government for...

  1. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  2. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  3. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  4. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., at the request of the applicant when good cause is shown. The permit may be modified to reflect the...) Stack gas monitoring and pollution control equipment. (H) Nozzle and burner design. (I) Construction... imminent hazard to human health or the environment; (iii) The trial burn will help the Director to...

  5. 36 CFR 7.86 - Big Cypress National Preserve.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... designed, modified for or capable of cross country travel on or immediately over land, water, marsh... National Park Service within the boundaries of the Preserve. (2) Travel in Preserve areas. (i) Unless... permit, and (iv) Acknowledges in the permit that he/she has no interest in the real property. (2...

  6. 32 CFR 770.3 - Fishing regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Fishing regulations. 770.3 Section 770.3..., Virginia § 770.3 Fishing regulations. (a) All persons possessing the proper state license and Base permit are permitted to fish in the areas designated by the Annual Fishing Regulations on Marine Corps Base...

  7. 32 CFR 770.3 - Fishing regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Fishing regulations. 770.3 Section 770.3..., Virginia § 770.3 Fishing regulations. (a) All persons possessing the proper state license and Base permit are permitted to fish in the areas designated by the Annual Fishing Regulations on Marine Corps Base...

  8. 40 CFR 96.206 - Standard requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Trading Program General Provisions § 96.206 Standard requirements. (a) Permit requirements. (1) The CAIR designated representative of each CAIR SO2 source required to have a title V operating permit...

  9. 40 CFR 65.4 - Recordkeeping.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...

  10. 40 CFR 65.4 - Recordkeeping.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...

  11. 40 CFR 65.4 - Recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...

  12. 40 CFR 65.4 - Recordkeeping.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...

  13. 40 CFR 65.4 - Recordkeeping.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required to obtain or operate a regulated source under a title V permit, then all applicable notifications... monitoring, and § 65.163(d)(1) for closed vent system design specifications. (2) If an owner or operator is not required to obtain or operate a regulated source under a title V permit, then all notifications...

  14. 50 CFR 32.33 - Indiana.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... regulations subject to the following conditions: 1. Condition B1 applies. 2. You must possess and carry a refuge permit during the State muzzleloader deer season. 3. You must possess and carry a refuge permit.... We allow the use of belly boats or float tubes in all designated fishing areas. 3. We allow fishing...

  15. 76 FR 11826 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... CFR 270.17a-6) permits a fund and a ``portfolio affiliate'' (a company that is an affiliated person of... enter into a principal transaction with a portfolio affiliate if certain prohibited participants (e.g.... 3501. The rule is designed to permit transactions between funds and their portfolio affiliates in...

  16. 40 CFR 172.23 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false State plans. 172.23 Section 172.23... PERMITS State Issuance of Experimental Use Permits § 172.23 State plans. (a) Submission. (1) A State may, by submitting a State plan, request the Administrator to authorize the designated State agency to...

  17. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles...

  18. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles...

  19. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles...

  20. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles...

  1. 43 CFR 420.23 - Public notice and information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted Events § 420.23 Public notice and information. Areas and trails may be marked with appropriate signs to permit, control or prohibit off-road vehicle use on Reclamation lands. All notices concerning the regulation of off-road vehicles...

  2. 77 FR 65398 - Tehachapi Uplands Multiple Species Habitat Conservation Plan; Kern County, CA; Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... wildlife by significantly impairing essential behavioral patterns, including breeding, feeding, and... be authorized by an incidental take permit, plant species may be included on a permit in recognition...

  3. QTest: Quantitative Testing of Theories of Binary Choice.

    PubMed

    Regenwetter, Michel; Davis-Stober, Clintin P; Lim, Shiau Hong; Guo, Ying; Popova, Anna; Zwilling, Chris; Cha, Yun-Shil; Messner, William

    2014-01-01

    The goal of this paper is to make modeling and quantitative testing accessible to behavioral decision researchers interested in substantive questions. We provide a novel, rigorous, yet very general, quantitative diagnostic framework for testing theories of binary choice. This permits the nontechnical scholar to proceed far beyond traditionally rather superficial methods of analysis, and it permits the quantitatively savvy scholar to triage theoretical proposals before investing effort into complex and specialized quantitative analyses. Our theoretical framework links static algebraic decision theory with observed variability in behavioral binary choice data. The paper is supplemented with a custom-designed public-domain statistical analysis package, the QTest software. We illustrate our approach with a quantitative analysis using published laboratory data, including tests of novel versions of "Random Cumulative Prospect Theory." A major asset of the approach is the potential to distinguish decision makers who have a fixed preference and commit errors in observed choices from decision makers who waver in their preferences.

  4. The pit and the pendulum: the impact on teen smokers of including a designated smoking area in school tobacco control policy.

    PubMed

    Baillie, L E; Lovato, C Y; Taylor, E; Rutherford, M B; Smith, M

    2008-12-01

    Thirty per cent of school districts in British Columbia do not ban smoking outright on school grounds, and in several instances, smoking is permitted in smoking pits, regardless of school district policy. While there is evidence to suggest that enforcing a tobacco-free environment for students does reduce adolescent smoking rates, the concomitant safety and discipline problems it creates for school staff and administration are demanding and complex, and may override concerns regarding student smoking. This study uses a qualitative approach to explore the meanings that students place on tobacco control policy and the impact that these meanings have on their own smoking behaviours. We found that students were surprised and concerned that smoking was permitted on school property and that it negatively impacted their own tobacco prevention/control/cessation attempts.

  5. Remotely sensed geology from lander-based to orbital perspectives: Results of FIDO rover May 2000 field tests

    USGS Publications Warehouse

    Jolliff, B.; Knoll, A.; Morris, R.V.; Moersch, J.; McSween, H.; Gilmore, M.; Arvidson, R.; Greeley, R.; Herkenhoff, K.; Squyres, S.

    2002-01-01

    Blind field tests of the Field Integration Design and Operations (FIDO) prototype Mars rover were carried out 7-16 May 2000. A Core Operations Team (COT), sequestered at the Jet Propulsion Laboratory without knowledge of test site location, prepared command sequences and interpreted data acquired by the rover. Instrument sensors included a stereo panoramic camera, navigational and hazard-avoidance cameras, a color microscopic imager, an infrared point spectrometer, and a rock coring drill. The COT designed command sequences, which were relayed by satellite uplink to the rover, and evaluated instrument data. Using aerial photos and Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data, and information from the rover sensors, the COT inferred the geology of the landing site during the 18 sol mission, including lithologic diversity, stratigraphic relationships, environments of deposition, and weathering characteristics. Prominent lithologic units were interpreted to be dolomite-bearing rocks, kaolinite-bearing altered felsic volcanic materials, and basalt. The color panoramic camera revealed sedimentary layering and rock textures, and geologic relationships seen in rock exposures. The infrared point spectrometer permitted identification of prominent carbonate and kaolinite spectral features and permitted correlations to outcrops that could not be reached by the rover. The color microscopic imager revealed fine-scale rock textures, soil components, and results of coring experiments. Test results show that close-up interrogation of rocks is essential to investigations of geologic environments and that observations must include scales ranging from individual boulders and outcrops (microscopic, macroscopic) to orbital remote sensing, with sufficient intermediate steps (descent images) to connect in situ and remote observations.

  6. A system for programming experiments and for recording and analyzing data automatically1

    PubMed Central

    Herrick, Robert M.; Denelsbeck, John S.

    1963-01-01

    A system designed for use in complex operant conditioning experiments is described. Some of its key features are: (a) plugboards that permit the experimenter to change either from one program to another or from one analysis to another in less than a minute, (b) time-sharing of permanently-wired, electronic logic components, (c) recordings suitable for automatic analyses. Included are flow diagrams of the system and sample logic diagrams for programming experiments and for analyzing data. ImagesFig. 4. PMID:14055967

  7. Planetary size comparisons: A photographic study

    NASA Technical Reports Server (NTRS)

    Meszaros, S. P.

    1983-01-01

    Over the past two decades NASA spacecraft missions obtained photographs permitting accurate size measurements of the planets and moons, and their surface features. Planetary global views are displayed at the same scale, in each picture to allow visual size comparisons. Additionally, special geographical features on some of the planets are compared with selected Earth areas, again at the same scale. Artist renderings and estimated sizes are used for worlds not yet reached by spacecraft. Included with each picture is number designation for use in ordering copies of the photos.

  8. Image dissector control and data system, part 1. [instrument packages and equipment specifications

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A general description of the image dissector control and data system is presented along with detailed design information, operating instructions, and maintenance and trouble-shooting procedures for the four instrumentation packages. The four instrumentation packages include a 90 inch telescope, a simplified telescope module for use on the 90 inch or other telescopes, a photographic plate scanner module which permits the scanning of astronomical photographic plates in the laboratory, and the lunar experiment package module.

  9. Designation of Issues -- World Color Press

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  10. A theoretical formulation of wave-vortex interactions

    NASA Technical Reports Server (NTRS)

    Wu, J. Z.; Wu, J. M.

    1989-01-01

    A unified theoretical formulation for wave-vortex interaction, designated the '(omega, Pi) framework,' is presented. Based on the orthogonal decomposition of fluid dynamic interactions, the formulation can be used to study a variety of problems, including the interaction of a longitudinal (acoustic) wave and/or transverse (vortical) wave with a main vortex flow. Moreover, the formulation permits a unified treatment of wave-vortex interaction at various approximate levels, where the normal 'piston' process and tangential 'rubbing' process can be approximated dfferently.

  11. Flexible imaging payload for real-time fluorescent biological imaging in parabolic, suborbital and space analog environments

    NASA Astrophysics Data System (ADS)

    Bamsey, Matthew T.; Paul, Anna-Lisa; Graham, Thomas; Ferl, Robert J.

    2014-10-01

    Fluorescent imaging offers the ability to monitor biological functions, in this case biological responses to space-related environments. For plants, fluorescent imaging can include general health indicators such as chlorophyll fluorescence as well as specific metabolic indicators such as engineered fluorescent reporters. This paper describes the Flex Imager a fluorescent imaging payload designed for Middeck Locker deployment and now tested on multiple flight and flight-related platforms. The Flex Imager and associated payload elements have been developed with a focus on 'flexibility' allowing for multiple imaging modalities and change-out of individual imaging or control components in the field. The imaging platform is contained within the standard Middeck Locker spaceflight form factor, with components affixed to a baseplate that permits easy rearrangement and fine adjustment of components. The Flex Imager utilizes standard software packages to simplify operation, operator training, and evaluation by flight provider flight test engineers, or by researchers processing the raw data. Images are obtained using a commercial cooled CCD image sensor, with light-emitting diodes for excitation and a suite of filters that allow biological samples to be imaged over wavelength bands of interest. Although baselined for the monitoring of green fluorescent protein and chlorophyll fluorescence from Arabidopsis samples, the Flex Imager payload permits imaging of any biological sample contained within a standard 10 cm by 10 cm square Petri plate. A sample holder was developed to secure sample plates under different flight profiles while permitting sample change-out should crewed operations be possible. In addition to crew-directed imaging, autonomous or telemetric operation of the payload is also a viable operational mode. An infrared camera has also been integrated into the Flex Imager payload to allow concurrent fluorescent and thermal imaging of samples. The Flex Imager has been utilized to assess, in real-time, the response of plants to novel environments including various spaceflight analogs, including several parabolic flight environments as well as hypobaric plant growth chambers. Basic performance results obtained under these operational environments, as well as laboratory-based tests are described. The Flex Imager has also been designed to be compatible with emerging suborbital platforms.

  12. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... facilities authorized by Presidential Permit No. PP-22, as amended, include seven single conductor 132 kilovolt (kV) submarine cables and three single conductor 260 kV DC submarine cables. These cables do not...

  13. 40 CFR 270.65 - Research, development, and demonstration permits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 266. Any such permit shall include such terms and conditions as will assure protection of human health... technology or process on human health and the environment, and (3) Shall include such requirements as the Administrator deems necessary to protect human health and the environment (including, but not limited to...

  14. Multiple Antenna Implementation System (MAntIS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, M.D.; Batchelor, D.B.; Jaeger, E.F.

    1993-01-01

    The MAntIS code was developed as an aid to the design of radio frequency (RF) antennas for fusion applications. The code solves for the electromagnetic fields in three dimensions near the antenna structure with a realistic plasma load. Fourier analysis is used in the two dimensions that are tangential to the plasma surface and backwall. The third dimension is handled analytically in a vacuum region with a general impedance match at the plasma-vacuum interface. The impedance tensor is calculated for a slab plasma using the ORION-lD code with all three electric field components included and warm plasma corrections. The codemore » permits the modeling of complicated antenna structures by superposing currents that flow on the surfaces of rectangular parallelepipeds. Specified current elements have feeders that continuously connect the current flowing from the ends of the strap to the feeders. The elements may have an arbitrary orientation with respect to the static magnetic field. Currents are permitted to vary along the length of the current strap and feeders. Parameters that describe this current variation can be adjusted to approximately satisfy boundary conditions on the current elements. The methods used in MAntIS and results for a primary loop antenna design are presented.« less

  15. Streamstats: U.S. Geological Survey Web Application for Streamflow Statistics for Connecticut

    USGS Publications Warehouse

    Ahearn, Elizabeth A.; Ries, Kernell G.; Steeves, Peter A.

    2006-01-01

    Introduction An important mission of the U. S. Geological Survey (USGS) is to provide information on streamflow in the Nation's rivers. Streamflow statistics are used by water managers, engineers, scientists, and others to protect people and property during floods and droughts, and to manage land, water, and biological resources. Common uses for streamflow statistics include dam, bridge, and culvert design; water-supply planning and management; water-use appropriations and permitting; wastewater and industrial discharge permitting; hydropower-facility design and regulation; and flood-plain mapping for establishing flood-insurance rates and land-use zones. In an effort to improve access to published streamflow statistics, and to make the process of computing streamflow statistics for ungaged stream sites easier, more accurate, and more consistent, the USGS and the Environmental Systems Research Institute, Inc. (ESRI) developed StreamStats (Ries and others, 2004). StreamStats is a Geographic Information System (GIS)-based Web application for serving previously published streamflow statistics and basin characteristics for USGS data-collection stations, and computing streamflow statistics and basin characteristics for ungaged stream sites. The USGS, in cooperation with the Connecticut Department of Environmental Protection and the Connecticut Department of Transportation, has implemented StreamStats for Connecticut.

  16. 36 CFR 327.14 - Public property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... District Commander. (d) The use of metal detectors is permitted on designated beaches or other previously..., historical or paleontological resources. Specific information regarding metal detector policy and designated...

  17. 36 CFR 327.14 - Public property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... District Commander. (d) The use of metal detectors is permitted on designated beaches or other previously..., historical or paleontological resources. Specific information regarding metal detector policy and designated...

  18. 36 CFR 327.14 - Public property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... District Commander. (d) The use of metal detectors is permitted on designated beaches or other previously..., historical or paleontological resources. Specific information regarding metal detector policy and designated...

  19. Usable Interface Design for Everyone

    NASA Astrophysics Data System (ADS)

    de Castro Lozano, Carlos; Salcines, Enrique García; Sainz de Abajo, Beatriz; Burón Fernández, F. Javier; Ramírez, José Miguel; Recellado, José Gabriel Zato; Montoya, Rafael Sanchez; Bell, John; Marin, Francisco Alcantud

    When designing "interfaces for everyone" for interactive systems, it is important to consider factors such as cost, the intended market, the state of the environment, etc. User interfaces are fundamental for the developmental process in any application, and its design must be contemplated from the start. Of the distinct parts of a system (hardware and software), it is the interface that permits the user access to computer resources. The seven principles of "Universal Design" or "Design for Everyone" focus on a universal usable design, but at the same time acknowledge the influences of internal and external factors. Structural changes in social and health services could provide an increase in the well-being of a country's citizens through the use of self-care programming and proactive management/prevention of disease. Automated home platforms can act as an accessibility instrument which permits users to avoid, compensate, mitigate, or neutralize the deficiencies and dependencies caused by living alone.

  20. Nonlinear Analysis and Preliminary Testing Results of a Hybrid Wing Body Center Section Test Article

    NASA Technical Reports Server (NTRS)

    Przekop, Adam; Jegley, Dawn C.; Rouse, Marshall; Lovejoy, Andrew E.; Wu, Hsi-Yung T.

    2015-01-01

    A large test article was recently designed, analyzed, fabricated, and successfully tested up to the representative design ultimate loads to demonstrate that stiffened composite panels with through-the-thickness reinforcement are a viable option for the next generation large transport category aircraft, including non-conventional configurations such as the hybrid wing body. This paper focuses on finite element analysis and test data correlation of the hybrid wing body center section test article under mechanical, pressure and combined load conditions. Good agreement between predictive nonlinear finite element analysis and test data is found. Results indicate that a geometrically nonlinear analysis is needed to accurately capture the behavior of the non-circular pressurized and highly-stressed structure when the design approach permits local buckling.

  1. The LeRC rail accelerators: Test designs and diagnostic techniques

    NASA Technical Reports Server (NTRS)

    Zana, L. M.; Kerslake, W. R.; Sturman, J. C.; Wang, S. Y.; Terdan, F. F.

    1983-01-01

    The feasibility of using rail accelerators for various in-space and to-space propulsion applications was investigated. A 1 meter, 24 sq mm bore accelerator was designed with the goal of demonstrating projectile velocities of 15 km/sec using a peak current of 200 kA. A second rail accelerator, 1 meter long with a 156.25 sq mm bore, was designed with clear polycarbonate sidewalls to permit visual observation of the plasma arc. A study of available diagnostic techniques and their application to the rail accelerator is presented. Specific topics of discussion include the use of interferometry and spectroscopy to examine the plasma armature as well as the use of optical sensors to measure rail displacement during acceleration. Standard diagnostics such as current and voltage measurements are also discussed.

  2. 30 CFR 780.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...

  3. 76 FR 6491 - San Diego County Water Authority Subregional Natural Community Conservation Program/Habitat...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    ... impairing essential behavioral patterns, including breeding, feeding, and sheltering (50 CFR 17.3(c)). Under... incidental take permit, plant species are proposed to be included on the permit in recognition of the...

  4. 40 CFR 52.530 - Significant deterioration of air quality.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Air Resource Management that establishes prevention of significant deterioration (PSD) applicability...-emitting sources and issue GHG PSD permits. FDEP's December 19, 2013 SIP revision also includes a GHG PSD Permit Transition Plan which governs the transition from EPA administering GHG PSD permitting...

  5. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  6. 76 FR 48182 - Notice of Permit Application Received Under the Antarctic Conservation Act of 1978

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    .... Designated pollutants would be associated with camp operations [typically air emissions and waste water... (NSF) has received a waste management permit application for operation of a field research camp located...: NSF's Antarctic Waste Regulation, 45 CFR part 671, requires all U.S. citizens and entities to obtain a...

  7. 78 FR 27196 - Modification of Permit Application and Intent for Additional Public Scoping for an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... simulations. Final channel design and associated environmental impacts will be addressed during the permitting and EIS process. The EIS will evaluate the effects of construction and long term effects of the... in the EIS process; announce the plans for an additional public scoping meeting; solicit public...

  8. 77 FR 71713 - Policies To Promote Rural Radio Service and To Streamline Allotment and Assignment Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-04

    ...: Control Number: 3060-0031. Title: Application for Consent to Assignment of Broadcast Station Construction... Station Construction Permit or License, FCC Form 315; Section 73.3580, Local Public Notice of Filing of... construction permits designed primarily to serve Tribal Lands (the ``Tribal Priority''). Tribal affiliated...

  9. 78 FR 66980 - Self-Regulatory Organizations; BOX Options Exchange LLC; Notice of Designation of Longer Period...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-07

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-70797; File No. SR-BOX-2013-43] Self-Regulatory... Proposed Rule Change To Permit Complex Orders To Participate in Price Improvement Periods November 1, 2013... to permit Complex Orders to participate in Price Improvement Periods (the ``COPIP'') and to make...

  10. 50 CFR 21.31 - Rehabilitation permits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... transfer within 48 hours types of migratory bird species not authorized by your permit, in cases of... authorization, if one is required in your State; and (3) A check or money order made payable to the “U.S. Fish.... In rare cases, the Service may designate a disposition other than euthanasia for those birds. If...

  11. 50 CFR 21.31 - Rehabilitation permits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transfer within 48 hours types of migratory bird species not authorized by your permit, in cases of... authorization, if one is required in your State; and (3) A check or money order made payable to the “U.S. Fish.... In rare cases, the Service may designate a disposition other than euthanasia for those birds. If...

  12. 50 CFR 21.31 - Rehabilitation permits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... transfer within 48 hours types of migratory bird species not authorized by your permit, in cases of... authorization, if one is required in your State; and (3) A check or money order made payable to the “U.S. Fish.... In rare cases, the Service may designate a disposition other than euthanasia for those birds. If...

  13. Design of the 2D electron cyclotron emission imaging instrument for the J-TEXT tokamak.

    PubMed

    Pan, X M; Yang, Z J; Ma, X D; Zhu, Y L; Luhmann, N C; Domier, C W; Ruan, B W; Zhuang, G

    2016-11-01

    A new 2D Electron Cyclotron Emission Imaging (ECEI) diagnostic is being developed for the J-TEXT tokamak. It will provide the 2D electron temperature information with high spatial, temporal, and temperature resolution. The new ECEI instrument is being designed to support fundamental physics investigations on J-TEXT including MHD, disruption prediction, and energy transport. The diagnostic contains two dual dipole antenna arrays corresponding to F band (90-140 GHz) and W band (75-110 GHz), respectively, and comprises a total of 256 channels. The system can observe the same magnetic surface at both the high field side and low field side simultaneously. An advanced optical system has been designed which permits the two arrays to focus on a wide continuous region or two radially separate regions with high imaging spatial resolution. It also incorporates excellent field curvature correction with field curvature adjustment lenses. An overview of the diagnostic and the technical progress including the new remote control technique are presented.

  14. Design of the 2D electron cyclotron emission imaging instrument for the J-TEXT tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pan, X. M.; Yang, Z. J., E-mail: yangzj@hust.edu.cn; Ma, X. D.

    2016-11-15

    A new 2D Electron Cyclotron Emission Imaging (ECEI) diagnostic is being developed for the J-TEXT tokamak. It will provide the 2D electron temperature information with high spatial, temporal, and temperature resolution. The new ECEI instrument is being designed to support fundamental physics investigations on J-TEXT including MHD, disruption prediction, and energy transport. The diagnostic contains two dual dipole antenna arrays corresponding to F band (90-140 GHz) and W band (75-110 GHz), respectively, and comprises a total of 256 channels. The system can observe the same magnetic surface at both the high field side and low field side simultaneously. An advancedmore » optical system has been designed which permits the two arrays to focus on a wide continuous region or two radially separate regions with high imaging spatial resolution. It also incorporates excellent field curvature correction with field curvature adjustment lenses. An overview of the diagnostic and the technical progress including the new remote control technique are presented.« less

  15. Shuttle Entry Air Data System (SEADS) hardware development. Volume 1: Summary

    NASA Technical Reports Server (NTRS)

    While, D. M.

    1983-01-01

    Hardware development of the Shuttle Entry Data System (SEADS) is described. The system consists of an array of fourteen pressure ports, installed in an Orbiter nose cap, which, when coupled with existing fuselage mounted static pressure ports permits computation of entry flight parameters. Elements of the system that are described include the following: (1) penetration assemblies to place pressure port openings at the surface of the nose cap; (2) pressure tubes to transmit the surface pressure to transducers; (3) support posts or manifolds to provide support for, and reduce the length of, the individual pressure tubes; (4) insulation for the manifolds; and (5) a SEADS nose cap. Design, analyses, and tests to develop and certify design for flight are described. Specific tests include plasma arc exposure, radiant thermal, vibration, and structural. Volume one summarizes highlights of the program, particularly as they relate to the final design of SEADS. Volume two summarizes all of the Vought responsible activities in essentially a chronological order.

  16. Shuttle Entry Air Data System (SEADS) hardware development. Volume 2: History

    NASA Technical Reports Server (NTRS)

    While, D. M.

    1983-01-01

    Hardware development of the Shuttle Entry Air Data System (SEADS) is described. The system consists of an array of fourteen pressure ports, installed in an Orbiter nose cap, which, when coupled with existing fuselage mounted static pressure ports permits computation of entry flight parameters. Elements of the system that are described include the following: (1) penetration assemblies to place pressure port openings at the surface of the nose cap; (2) pressure tubes to transmit the surface pressure to transducers; (3) support posts or manifolds to provide support for, and reduce the length of, the individual pressure tubes; (4) insulation for the manifolds; and (5) a SEADS nose cap. Design, analyses, and tests to develop and certify design for flight are described. Specific tests included plasma arc exposure, radiant thermal, vibration, and structural. Volume one summarizes highlights of the program, particularly as they relate to the final design of SEADS. Volume two summarizes all of the Vought responsible activities in essentially a chronological order.

  17. 36 CFR § 327.14 - Public property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... District Commander. (d) The use of metal detectors is permitted on designated beaches or other previously..., historical or paleontological resources. Specific information regarding metal detector policy and designated...

  18. Fixed-Order Mixed Norm Designs for Building Vibration Control

    NASA Technical Reports Server (NTRS)

    Whorton, Mark S.; Calise, Anthony J.

    2000-01-01

    This study investigates the use of H2, mu-synthesis, and mixed H2/mu methods to construct full order controllers and optimized controllers of fixed dimensions. The benchmark problem definition is first extended to include uncertainty within the controller bandwidth in the form of parametric uncertainty representative of uncertainty in the natural frequencies of the design model. The sensitivity of H2 design to unmodeled dynamics and parametric uncertainty is evaluated for a range of controller levels of authority. Next, mu-synthesis methods are applied to design full order compensators that are robust to both unmodeled dynamics and to parametric uncertainty. Finally, a set of mixed H2/mu compensators are designed which are optimized for a fixed compensator dimension. These mixed norm designs recover the H2 design performance levels while providing the same levels of robust stability as the mu designs. It is shown that designing with the mixed norm approach permits higher levels of controller authority for which the H2 designs are destabilizing. The benchmark problem is that of an active tendon system. The controller designs are all based on the use of acceleration feedback.

  19. 40 CFR 97.314 - Objections concerning CAIR designated representative.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Objections concerning CAIR designated... Designated Representative for CAIR NOX Ozone Season Sources § 97.314 Objections concerning CAIR designated... the permitting authority or the Administrator concerning the authorization, or any representation...

  20. Aerodynamic characteristics of some lifting reentry concepts applicable to transatmospheric vehicle design studies

    NASA Technical Reports Server (NTRS)

    Spearman, M. L.

    1984-01-01

    The aerodynamic characteristics of some lifting reentry concepts are examined with a view to the applicability of such concepts to the design of possible transatmospheric vehicles (TAV). A considerable amount of research has been done in past years with vehicle concepts suitable for manned atmospheric-entry, atmospheric flight, and landing. Some of the features of these concepts that permit flight in or out of the atmosphere with maneuver capability should be useful in the mission requirements of TAV's. The concepts illustrated include some hypersonic-body shapes with and without variable geometry surfaces, and a blunt lifting-body configuration. The merits of these concepts relative to the aerodynamic behavior of a TAV are discussed.

  1. SPP: A data base processor data communications protocol

    NASA Technical Reports Server (NTRS)

    Fishwick, P. A.

    1983-01-01

    The design and implementation of a data communications protocol for the Intel Data Base Processor (DBP) is defined. The protocol is termed SPP (Service Port Protocol) since it enables data transfer between the host computer and the DBP service port. The protocol implementation is extensible in that it is explicitly layered and the protocol functionality is hierarchically organized. Extensive trace and performance capabilities have been supplied with the protocol software to permit optional efficient monitoring of the data transfer between the host and the Intel data base processor. Machine independence was considered to be an important attribute during the design and implementation of SPP. The protocol source is fully commented and is included in Appendix A of this report.

  2. Fabrication of the planar angular rotator using the CMOS process

    NASA Astrophysics Data System (ADS)

    Dai, Ching-Liang; Chang, Chien-Liu; Chen, Hung-Lin; Chang, Pei-Zen

    2002-05-01

    In this investigation we propose a novel planar angular rotator fabricated by the conventional complementary metal-oxide semiconductor (CMOS) process. Following the 0.6 μm single poly triple metal (SPTM) CMOS process, the device is completed by a simple maskless, post-process etching step. The rotor of the planar angular rotator rotates around its geometric center with electrostatic actuation. The proposed design adopts an intelligent mechanism including the slider-crank system to permit simultaneous motion. The CMOS planar angular rotator could be driven with driving voltages of around 40 V. The design proposed here has a shorter response time and longer life, without problems of friction and wear, compared to the more common planar angular micromotor.

  3. Beyond singular values and loop shapes

    NASA Technical Reports Server (NTRS)

    Stein, G.

    1985-01-01

    The status of singular value loop-shaping as a design paradigm for multivariable feedback systems is reviewed. It shows that this paradigm is an effective design tool whenever the problem specifications are spacially round. The tool can be arbitrarily conservative, however, when they are not. This happens because singular value conditions for robust performance are not tight (necessary and sufficient) and can severely overstate actual requirements. An alternate paradign is discussed which overcomes these limitations. The alternative includes a more general problem formulation, a new matrix function mu, and tight conditions for both robust stability and robust performance. The state of the art currently permits analysis of feedback systems within this new paradigm. Synthesis remains a subject of research.

  4. The Rover Environmental Monitoring Station Ground Temperature Sensor: a pyrometer for measuring ground temperature on Mars.

    PubMed

    Sebastián, Eduardo; Armiens, Carlos; Gómez-Elvira, Javier; Zorzano, María P; Martinez-Frias, Jesus; Esteban, Blanca; Ramos, Miguel

    2010-01-01

    We describe the parameters that drive the design and modeling of the Rover Environmental Monitoring Station (REMS) Ground Temperature Sensor (GTS), an instrument aboard NASA's Mars Science Laboratory, and report preliminary test results. REMS GTS is a lightweight, low-power, and low cost pyrometer for measuring the Martian surface kinematic temperature. The sensor's main feature is its innovative design, based on a simple mechanical structure with no moving parts. It includes an in-flight calibration system that permits sensor recalibration when sensor sensitivity has been degraded by deposition of dust over the optics. This paper provides the first results of a GTS engineering model working in a Martian-like, extreme environment.

  5. The Personal Satellite Assistant: An Internal Spacecraft Autonomous Mobile Monitor

    NASA Technical Reports Server (NTRS)

    Dorais, Gregory A.; Gawdiak, Yuri; Clancy, Daniel (Technical Monitor)

    2002-01-01

    This paper presents an overview of the research and development effort at the NASA Ames Research Center to create an internal spacecraft autonomous mobile monitor capable of performing intra-vehicular sensing activities by autonomously navigating onboard the International Space Station. We describe the capabilities, mission roles, rationale, high-level functional requirements, and design challenges for an autonomous mobile monitor. The rapid prototyping design methodology used, in which five prototypes of increasing fidelity are designed, is described as well as the status of these prototypes, of which two are operational and being tested, and one is actively being designed. The physical test facilities used to perform ground testing are briefly described, including a micro-gravity test facility that permits a prototype to propel itself in 3 dimensions with 6 degrees-of-freedom as if it were in an micro-gravity environment. We also describe an overview of the autonomy framework and its components including the software simulators used in the development process. Sample mission test scenarios are also described. The paper concludes with a discussion of future and related work followed by the summary.

  6. Overview of the MEDLI Project

    NASA Technical Reports Server (NTRS)

    Gazarik, Michael J.; Hwang, Helen; Little, Alan; Cheatwood, Neil; Wright, Michael; Herath, Jeff

    2007-01-01

    The Mars Science Laboratory Entry, Descent, and Landing Instrumentation (MEDLI) Project's objectives are to measure aerothermal environments, sub-surface heatshield material response, vehicle orientation, and atmospheric density for the atmospheric entry and descent phases of the Mars Science Laboratory (MSL) entry vehicle. The flight science objectives of MEDLI directly address the largest uncertainties in the ability to design and validate a robust Mars entry system, including aerothermal, aerodynamic and atmosphere models, and thermal protection system (TPS) design. The instrumentation suite will be installed in the heatshield of the MSL entry vehicle. The acquired data will support future Mars entry and aerocapture missions by providing measured atmospheric data to validate Mars atmosphere models and clarify the design margins for future Mars missions. MEDLI thermocouple and recession sensor data will significantly improve the understanding of aeroheating and TPS performance uncertainties for future missions. MEDLI pressure data will permit more accurate trajectory reconstruction, as well as separation of aerodynamic and atmospheric uncertainties in the hypersonic and supersonic regimes. This paper provides an overview of the project including the instrumentation design, system architecture, and expected measurement response.

  7. Overview of the MEDLI Project

    NASA Technical Reports Server (NTRS)

    Gazarik, Michael J.; Little, Alan; Cheatwood, F. Neil; Wright, Michael J.; Herath, Jeff A.; Martinez, Edward R.; Munk, Michelle; Novak, Frank J.; Wright, Henry S.

    2008-01-01

    The Mars Science Laboratory Entry, Descent, and Landing Instrumentation (MEDLI) Project s objectives are to measure aerothermal environments, sub-surface heatshield material response, vehicle orientation, and atmospheric density for the atmospheric entry and descent phases of the Mars Science Laboratory (MSL) entry vehicle. The flight science objectives of MEDLI directly address the largest uncertainties in the ability to design and validate a robust Mars entry system, including aerothermal, aerodynamic and atmosphere models, and thermal protection system (TPS) design. The instrumentation suite will be installed in the heatshield of the MSL entry vehicle. The acquired data will support future Mars entry and aerocapture missions by providing measured atmospheric data to validate Mars atmosphere models and clarify the design margins for future Mars missions. MEDLI thermocouple and recession sensor data will significantly improve the understanding of aeroheating and TPS performance uncertainties for future missions. MEDLI pressure data will permit more accurate trajectory reconstruction, as well as separation of aerodynamic and atmospheric uncertainties in the hypersonic and supersonic regimes. This paper provides an overview of the project including the instrumentation design, system architecture, and expected measurement response.

  8. New Worlds Observer Formation Control Design Based on the Dynamics of Relative Motion

    NASA Technical Reports Server (NTRS)

    Luquette, Richard J.

    2008-01-01

    The New Worlds Observer (NWO) mission is designed for the direct detection and characterization of extrasolar planets. The NWO mission concept employs a two spacecraft leader-follower formation on a trajectory around the Earth/Moon-Sun L(sub 2) Libration Point. The leader spacecraft is baselined as a 4 meter optical telescope. The follower, Starshade spacecraft, is designed to suppress light from a central body star permitting direct detection of a surrounding exoplanetary system. The current design requires a nominal leader-follower separation range of 72 Megameters. NWO poses many challenges including formation control. NWO cycles between three principal control modes during the nominal mission timeline: science (fine pointing), realignment and transition. This paper examines formation control strategies in the context of dynamics of relative motion for two spacecraft operating in the vicinity of the Earth/Moon-Sun L(sub 2)libration point. The paper presents an overview of the equations of relative motion followed by a discussion of each of the control modes. Discussion and analysis characterize control strategies for each of the mission control modes, including requirements, implementation challenges and project fuel budgets.

  9. Memory Network For Distributed Data Processors

    NASA Technical Reports Server (NTRS)

    Bolen, David; Jensen, Dean; Millard, ED; Robinson, Dave; Scanlon, George

    1992-01-01

    Universal Memory Network (UMN) is modular, digital data-communication system enabling computers with differing bus architectures to share 32-bit-wide data between locations up to 3 km apart with less than one millisecond of latency. Makes it possible to design sophisticated real-time and near-real-time data-processing systems without data-transfer "bottlenecks". This enterprise network permits transmission of volume of data equivalent to an encyclopedia each second. Facilities benefiting from Universal Memory Network include telemetry stations, simulation facilities, power-plants, and large laboratories or any facility sharing very large volumes of data. Main hub of UMN is reflection center including smaller hubs called Shared Memory Interfaces.

  10. 40 CFR 123.42 - Receipt and use of Federal information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... administering the permit program any relevant information which was collected by EPA. The Memorandum of... pending permit applications or any other relevant information collected before the approval of the State...), relevant information includes support files for permit issuance, compliance reports and records of...

  11. 30 CFR 740.13 - Permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Permits. 740.13 Section 740.13 Mineral... regulations. (3) Surface coal mining operations authorized under the initial regulatory program or 43 CFR... package shall be filed with the regulatory authority. (3) Each permit application package shall include...

  12. Report: Substantial Changes Needed in Implementation and Oversight of Title V Permits If Program Goals Are To Be Fully Realized

    EPA Pesticide Factsheets

    Report #2005-P-00010, March 9, 2005. Our analysis identified concerns with five key aspects of Title V permits, including permit clarity, statements of basis, monitoring provisions, annual compliance certifications, and practical enforceability.

  13. 77 FR 36607 - Office of Hazardous Materials Safety Notice of Applications for Modification of Special Permit

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-19

    ... is desired, include a self-addressed stamped postcard showing the special permit number. FOR FURTHER... de Mexico, 49 CFR 173.301(a), To modify the special S.A. C.V. de Ciudad 173.302(a), permit to...

  14. 75 FR 67765 - Endangered and Threatened Species Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ... requests a new permit for research and recovery purposes to conduct presence/absence surveys for golden... permit for research and recovery purposes to conduct presence/absence surveys for southwestern willow... activities they undertake, including, but not limited to presence/absence surveys, research, and...

  15. Austin chalk maintains brisk drilling pace

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-04-01

    Horizontal drilling in the Cretaceous Austin chalk trend of South Texas continues to set a fast pace. The Texas Railroad Commission has issued nearly 900 permits to drill horizontal wells in the Pearsall field area alone from 1984 through February 1991. TRC issued 1,485 permits for horizontal wells statewide during that period, including 1,285 since Jan. 1, 1990. Statewide, operators have reported completion of 685 horizontal wells. That includes 472 in Pearsall field, where TRC has issued 882 permits, and 121 in Giddings field, where 305 permits have been issued. Frio County, site of Pearsall field, led Texas counties withmore » 494 permits and 278 horizontal completions. Oil drilling and reentry work is under way in many areas, and horizontal Austin chalk gas/condensate completions have been reported in Dimmit and Burleson counties.« less

  16. Improved biomedical electrode

    NASA Technical Reports Server (NTRS)

    Frost, J. D., Jr.

    1972-01-01

    Newly designed electrode is prefilled, disposable, electrolyte-saturated spong. New design permits longe periods of storage without deterioration, and readiness in matter of seconds. Electrodes supply signals for electroencephalogram, electro-oculogram, and electrocardiogram.

  17. 50 CFR 15.22 - Permits for scientific research.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 1 2014-10-01 2014-10-01 false Permits for scientific research. 15.22... for scientific research. (a) Application requirements for permits for scientific research. Each... description of the scientific research to be conducted on the exotic bird requested, including: (i) Formal...

  18. Hybrid power systems for autonomous MEMS

    NASA Astrophysics Data System (ADS)

    Bennett, Daniel M.; Selfridge, Richard H.; Humble, Paul; Harb, John N.

    2001-08-01

    This paper describes the design of a hybrid power system for use with autonomous MEMS and other microdevices. This hybrid power system includes energy conversion and storage along with an electronic system for managing the collection and distribution of power. It offers flexibility and longevity in a compact package. The hybrid power system couples a silicon solar cell with a microbattery specially designed for MEMS applications. We have designed a control/interface charging circuit to be compatible with a MEMS duty cycle. The design permits short pulses of 'high' power while taking care to avoid excessive charging or discharging of the battery. Charging is carefully controlled to provide a balance between acceptably small charging times and a charging profile that extends battery life. Our report describes the charging of our Ni/Zn microbatteries using solar cells. To date we have demonstrated thousands of charge/discharge cycles of a simulated MEMS duty cycle.

  19. Crossing the Barriers: An Analysis of Permitting Barriers to Geothermal Development and Potential Improvement Scenarios

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron L; Young, Katherine R

    Developers have identified many non-technical barriers to geothermal power development, including permitting. Activities required for permitting, such as the associated environmental reviews, can take a considerable amount of time and delay project development. This paper discusses the impacts to geothermal development timelines due to the permitting challenges, including the regulatory framework, environmental review process, and ancillary permits. We identified barriers that have the potential to prevent geothermal development or delay timelines and defined improvement scenarios that could assist in expediting geothermal development and permitting timelines and lead to the deployment of additional geothermal resources by 2030 and 2050: (1) themore » creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices as well as (2) an expansion of existing categorical exclusions applicable to geothermal development on Bureau of Land Management public lands to include the oil and gas categorical exclusions passed as part of the Energy Policy Act of 2005. We utilized the Regional Energy Deployment System (ReEDS) and the Geothermal Electricity Technology Evaluation Model (GETEM) to forecast baseline geothermal deployment based on previous analysis of geothermal project development and permitting timelines. The model results forecast that reductions in geothermal project timelines can have a significant impact on geothermal deployment. For example, using the ReEDS model, we estimated that reducing timelines by two years, perhaps due to the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices, could result in deployment of an additional 204 MW by 2030 and 768 MW by 2050 - a 13% improvement when compared to the business as usual scenario. The model results forecast that a timeline improvement of four years - for example with an expansion of existing categorical exclusions coupled with the creation of a centralized federal geothermal permitting office and utilization of state permit coordination offices - could result in deployment of an additional 2,529 MW of geothermal capacity by 2030 and 6,917 MW of geothermal capacity by 2050 - an improvement of 116% when compared to the business as usual scenario. These results suggest that reducing development timelines could be a large driver in the deployment of geothermal resources.« less

  20. 77 FR 58988 - Shearwater Design, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Homeowner Tidal Power Electric Generation Project to be located in.... The proposed project would consist of: (1) 10 hydrokinetic turbine units with an estimated total...

  1. 36 CFR § 1002.10 - Camping and food storage.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Camping and food storage. Â..., PUBLIC USE AND RECREATION § 1002.10 Camping and food storage. (a) The Board may require permits... result in the suspension or revocation of the permit. (d) Food storage. The Board may designate all or a...

  2. Advanced Propulsion for Gun Launched Projectiles and Missiles: Phase 1 - Low Cost Flight Test Platform Development

    DTIC Science & Technology

    2009-11-30

    Son blueberry fields as shown in Figure 113. All FAA and Maine DOT permits were acquired. Richard Willey was the designated LSO (Launch Safety...The launch area is on the Jasper Wyman & Son blueberry fields as shown in Figure 113. FAA and Maine DOT permits are required for flight testing

  3. 33 CFR Appendix A to Part 325 - Permit Form and Special Conditions

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...). () Section 404 of the Clean Water Act (33 U.S.C. 1344). () Section 103 of the Marine Protection, Research and... unpermitted activities or structures caused by the activity authorized by this permit. d. Design or... Ocean Service, Office of Coast Survey, N/CS261, 1315 East West Highway, Silver Spring, Maryland 20910...

  4. 33 CFR Appendix A to Part 325 - Permit Form and Special Conditions

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...). () Section 404 of the Clean Water Act (33 U.S.C. 1344). () Section 103 of the Marine Protection, Research and... unpermitted activities or structures caused by the activity authorized by this permit. d. Design or... Ocean Service, Office of Coast Survey, N/CS261, 1315 East West Highway, Silver Spring, Maryland 20910...

  5. 33 CFR Appendix A to Part 325 - Permit Form and Special Conditions

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...). () Section 404 of the Clean Water Act (33 U.S.C. 1344). () Section 103 of the Marine Protection, Research and... unpermitted activities or structures caused by the activity authorized by this permit. d. Design or... Ocean Service, Office of Coast Survey, N/CS261, 1315 East West Highway, Silver Spring, Maryland 20910...

  6. 33 CFR Appendix A to Part 325 - Permit Form and Special Conditions

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...). () Section 404 of the Clean Water Act (33 U.S.C. 1344). () Section 103 of the Marine Protection, Research and... unpermitted activities or structures caused by the activity authorized by this permit. d. Design or... Ocean Service, Office of Coast Survey, N/CS261, 1315 East West Highway, Silver Spring, Maryland 20910...

  7. Design and analysis of frequency-selective surface enabled microbolometers

    NASA Astrophysics Data System (ADS)

    Liu, Tao; Qu, Chuang; Almasri, Mahmoud; Kinzel, Edward

    2016-05-01

    Frequency Selective Surfaces (FSS) are periodic array of sub-wavelength antenna elements. They allow the absorptance and reflectance of a surface to be engineered with respect to wavelength, polarization and angle-of-incidence. This paper applies this technique to microbolometers for uncooled infrared sensing applications. Both narrowband and broadband near perfect absorbing surfaces are synthesized and applied engineer the response of microbolometers. The paper focuses on simple FSS geometries (hexagonal close packed disk arrays) that can be fabricated using conventional lithographic tools for use at thermal infrared wavelengths (feature sizes > 1 μm). The affects of geometry and material selection for this geometry is described in detail. In the microbolometer application, the FSS controls the absorption rather than a conventional Fabry-Perot cavity and this permits an improved thermal design. A coupled full wave electromagnetic/transient thermal model of the entire microbolometer is presented and analyzed using the finite element method. The absence of the cavity also permits more flexibility in the design of the support arms/contacts. This combined modeling permits prediction of the overall device sensitivity, time-constant and the specific detectivity.

  8. A next generation, pilot-scale continuous sterilization system for fermentation media

    PubMed Central

    Lester, M.; Brix, T.; Wong, D.; Nuechterlein, J.

    2006-01-01

    A new continuous sterilization system was designed, constructed, started up, and qualified for media sterilization for secondary metabolite cultivations, bioconversions, and enzyme production. An existing Honeywell Total Distributed Control 3000-based control system was extended using redundant High performance Process Manager controllers for 98 I/O (input/output) points. This new equipment was retrofitted into an industrial research fermentation pilot plant, designed and constructed in the early 1980s. Design strategies of this new continuous sterilizer system and the expanded control system are described and compared with the literature (including dairy and bio-waste inactivation applications) and the weaknesses of the prior installation for expected effectiveness. In addition, the reasoning behind selection of some of these improved features has been incorporated. Examples of enhancements adopted include sanitary heat exchanger (HEX) design, incorporation of a “flash” cooling HEX, on-line calculation of Fo and Ro, and use of field I/O modules located near the vessel to permit low-cost addition of new instrumentation. Sterilizer performance also was characterized over the expected range of operating conditions. Differences between design and observed temperature, pressure, and other profiles were quantified and investigated. PMID:16496186

  9. Shape optimization of disc-type flywheels

    NASA Technical Reports Server (NTRS)

    Nizza, R. S.

    1976-01-01

    Techniques were developed for presenting an analytical and graphical means for selecting an optimum flywheel system design, based on system requirements, geometric constraints, and weight limitations. The techniques for creating an analytical solution are formulated from energy and structural principals. The resulting flywheel design relates stress and strain pattern distribution, operating speeds, geometry, and specific energy levels. The design techniques incorporate the lowest stressed flywheel for any particular application and achieve the highest specific energy per unit flywheel weight possible. Stress and strain contour mapping and sectional profile plotting reflect the results of the structural behavior manifested under rotating conditions. This approach toward flywheel design is applicable to any metal flywheel, and permits the selection of the flywheel design to be based solely on the criteria of the system requirements that must be met, those that must be optimized, and those system parameters that may be permitted to vary.

  10. Monitoring Knowledge Base (MKB)

    EPA Pesticide Factsheets

    The Monitoring Knowledge Base (MKB) is a compilation of emissions measurement and monitoring techniques associated with air pollution control devices, industrial process descriptions, and permitting techniques, including flexible permit development. Using MKB, one can gain a comprehensive understanding of emissions sources, control devices, and monitoring techniques, enabling one to determine appropriate permit terms and conditions.

  11. 32 CFR 552.91 - Individual permit procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (2) Personal information including Social Security Number. (3) Vehicle identification and license number, if a vehicle is to be brought on post. (4) Names and ages of minor family members who will... section. (c) A permit and a vehicle pass will be issued to each person authorized area access. The permit...

  12. 32 CFR 552.91 - Individual permit procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (2) Personal information including Social Security Number. (3) Vehicle identification and license number, if a vehicle is to be brought on post. (4) Names and ages of minor family members who will... section. (c) A permit and a vehicle pass will be issued to each person authorized area access. The permit...

  13. 32 CFR 552.91 - Individual permit procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (2) Personal information including Social Security Number. (3) Vehicle identification and license number, if a vehicle is to be brought on post. (4) Names and ages of minor family members who will... section. (c) A permit and a vehicle pass will be issued to each person authorized area access. The permit...

  14. 32 CFR 552.91 - Individual permit procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (2) Personal information including Social Security Number. (3) Vehicle identification and license number, if a vehicle is to be brought on post. (4) Names and ages of minor family members who will... section. (c) A permit and a vehicle pass will be issued to each person authorized area access. The permit...

  15. 32 CFR 552.91 - Individual permit procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (2) Personal information including Social Security Number. (3) Vehicle identification and license number, if a vehicle is to be brought on post. (4) Names and ages of minor family members who will... section. (c) A permit and a vehicle pass will be issued to each person authorized area access. The permit...

  16. 40 CFR 69.41 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Significant Deterioration of Air Quality (PSD) permit issued to HOVIC; and shall include as a minimum, the... purpose of implementing the ICS at nearby locations approved by EPA and specified in the PSD permit. The... the NAAQS. (e) HOVIC must comply with all fuel switching requirements, contained in HOVIC's PSD permit...

  17. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  18. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  19. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  20. 40 CFR 69.41 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Significant Deterioration of Air Quality (PSD) permit issued to HOVIC; and shall include as a minimum, the... purpose of implementing the ICS at nearby locations approved by EPA and specified in the PSD permit. The... the NAAQS. (e) HOVIC must comply with all fuel switching requirements, contained in HOVIC's PSD permit...

Top