Horney, Jennifer A; Nguyen, Mai; Cooper, John; Simon, Matthew; Ricchetti-Masterson, Kristen; Grabich, Shannon; Salvesen, David; Berke, Philip
2013-01-01
Rural areas of the United States are uniquely vulnerable to the impacts of natural disasters. One possible way to mitigate vulnerability to disasters in rural communities is to have a high-quality hazard mitigation plan in place. To understand the resources available for hazard mitigation planning and determine how well hazard mitigation plans in rural counties meet the needs of vulnerable populations, we surveyed the lead planning or emergency management official responsible for hazard mitigation plans in 96 rural counties in eight states in the Southeastern United States. In most counties, emergency management was responsible for implementing the county's hazard mitigation plan and the majority of counties had experienced a presidentially declared disaster in the last 5 years. Our research findings demonstrated that there were differences in subjective measures of vulnerability (as reported by survey respondents) and objective measures of vulnerability (as determined by US Census data). In addition, although few counties surveyed included outreach to vulnerable groups as a part of their hazard mitigation planning process, a majority felt that their hazard mitigation plan addressed the needs of vulnerable populations "well" or "very well." These differences could result in increased vulnerabilities in rural areas, particularly for certain vulnerable groups.
A public health hazard mitigation planning process.
Griffith, Jennifer M; Kay Carpender, S; Crouch, Jill Artzberger; Quiram, Barbara J
2014-01-01
The Texas A&M Health Science Center School of Rural Public Health, a member of the Training and Education Collaborative System Preparedness and Emergency Response Learning Center (TECS-PERLC), has long-standing partnerships with 2 Health Service Regions (Regions) in Texas. TECS-PERLC was contracted by these Regions to address 2 challenges identified in meeting requirements outlined by the Risk-Based Funding Project. First, within Metropolitan Statistical Areas, there is not a formal authoritative structure. Second, preexisting tools and processes did not adequately satisfy requirements to assess public health, medical, and mental health needs and link mitigation strategies to the Public Health Preparedness Capabilities, which provide guidance to prepare for, respond to, and recover from public health incidents. TECS-PERLC, with its partners, developed a framework to interpret and apply results from the Texas Public Health Risk Assessment Tool (TxPHRAT). The 3-phase community engagement-based TxPHRAT Mitigation Planning Process (Mitigation Planning Process) and associated tools facilitated the development of mitigation plans. Tools included (1) profiles interpreting TxPHRAT results and identifying, ranking, and prioritizing hazards and capability gaps; (2) a catalog of intervention strategies and activities linked to hazards and capabilities; and (3) a template to plan, evaluate, and report mitigation planning efforts. The Mitigation Planning Process provided a framework for Regions to successfully address all funding requirements. TECS-PERLC developed more than 60 profiles, cataloged and linked 195 intervention strategies, and developed a template resulting in 20 submitted mitigation plans. A public health-focused, community engagement-based mitigation planning process was developed by TECS-PERLC and successfully implemented by the Regions. The outcomes met all requirements and reinforce the effectiveness of academic practice partnerships and importance of community engagement in mitigation planning. Additional funding has been approved to expand the Mitigation Planning Process to all counties in Texas with local health departments.
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.
2017-12-01
The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the five Pacific states will include new sections on tsunami load analysis of structures, and require Tsunami Design Zones based on probabilistic analyses. Guidance for community recovery planning has also been initiated. These new projects are being piloted by some States and will help create guidance for other States in the future.
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Tribal Mitigation Plans. 201... OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.7 Tribal Mitigation Plans. The Indian Tribal Mitigation Plan is the representation of the Indian tribal government's commitment to...
Managing for Successful Control of Naturally Occurring Asbestos During Large Scale Grading
NASA Astrophysics Data System (ADS)
Saur, R.; Harnish, D.; Cavanaugh, J.; Kendall, K.; Virdee, A.; Ludlam, D.
2012-12-01
Pacific Gas and Electric Company recently completed environmental remediation and civil grading of a 35-acre site in San Francisco Bay Area, and the project became recognized with local agencies as having excellent controls systems for naturally-occurring asbestos (NOA). The project began in 2010 and was completed in 2012, and involved excavating and grading over 100,000 tons of soil containing NOA. The work was subject to requirements by state, local and regional agencies, including an asbestos dust mitigation plan for the Bay Area Air Quality Management District. Effective control of NOA is attributed to management approaches combined with effective monitoring and state-of-the-art controls. Management Planning. The contract for construction specified NOA compliance management and controls, including having a NOA-control "czar" ultimately responsible for effective mitigation. An important element was daily pre-planning for excavation/grading that involved both the NOA mitigation experts and construction staff. Personnel Planning and Training. All construction personnel were trained before work regarding NOA hazards and mitigations. Daily tailboards with all construction personnel included discussions of the NOA controls integral to the daily work. Supervision. A NOA mitigation compliance leader was assigned to each excavation operation, responsible for continuously monitoring wind direction and work to ensure mitigation met requirements, and that disturbed areas were hydrosealed or covered. Adaptive Management - Daily and weekly debriefs occurred with those responsible for NOA controls to evaluate effectiveness, and identify improvements needed. If a monitoring result exceeded the project trigger level, work shut down and a root-cause analysis was performed to determine appropriate corrective actions. Deviations of results from background were researched as to cause, and any adjustments identified. Nearby non-project activities were monitored, as they occasionally caused trigger level exceedences in perimeter monitors, including from off-site vehicles, nearby construction, and mechanical vegetation management (e.g. weed whacking). Regulatory and Owner Oversight. Monitoring results were reported daily to agencies, agencies made frequent inspections, and owner's independent compliance representatives observed the NOA mitigation and provided real-time feedback to the construction team. NOA Controls. NOA emissions were controlled site-wide and for each work activity. Site systems included misting, water trucks on roads, temporary covers and soil sealants. Work activity controls for excavation/grading included both source and perimeter controls. Water application technologies specially designed for NOA fiber mitigation, and not just dust mitigation, were effective without adding excessive water to work areas. These activities collectively created a management structure that facilitated successful implementation of NOA control technologies.
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
44 CFR 78.5 - Flood Mitigation Plan development.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan development. 78.5 Section 78.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.5 Flood Mitigation Plan development. A Flood Mitigation Plan will articulate a...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Enhanced State Mitigation..., DEPARTMENT OF HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.5 Enhanced State Mitigation Plans. (a) A State with a FEMA approved Enhanced State Mitigation Plan at the time of a disaster...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
Success in transmitting hazard science
NASA Astrophysics Data System (ADS)
Price, J. G.; Garside, T.
2010-12-01
Money motivates mitigation. An example of success in communicating scientific information about hazards, coupled with information about available money, is the follow-up action by local governments to actually mitigate. The Nevada Hazard Mitigation Planning Committee helps local governments prepare competitive proposals for federal funds to reduce risks from natural hazards. Composed of volunteers with expertise in emergency management, building standards, and earthquake, flood, and wildfire hazards, the committee advises the Nevada Division of Emergency Management on (1) the content of the State’s hazard mitigation plan and (2) projects that have been proposed by local governments and state agencies for funding from various post- and pre-disaster hazard mitigation programs of the Federal Emergency Management Agency. Local governments must have FEMA-approved hazard mitigation plans in place before they can receive this funding. The committee has been meeting quarterly with elected and appointed county officials, at their offices, to encourage them to update their mitigation plans and apply for this funding. We have settled on a format that includes the county’s giving the committee an overview of its infrastructure, hazards, and preparedness. The committee explains the process for applying for mitigation grants and presents the latest information that we have about earthquake hazards, including locations of nearby active faults, historical seismicity, geodetic strain, loss-estimation modeling, scenarios, and documents about what to do before, during, and after an earthquake. Much of the county-specific information is available on the web. The presentations have been well received, in part because the committee makes the effort to go to their communities, and in part because the committee is helping them attract federal funds for local mitigation of not only earthquake hazards but also floods (including canal breaches) and wildfires, the other major concerns in Nevada. Local citizens appreciate the efforts of the state officials to present the information in a public forum. The Committee’s earthquake presentations to the counties are supplemented by regular updates in the two most populous counties during quarterly meetings of the Nevada Earthquake Safety Council, generally alternating between Las Vegas and Reno. We have only 17 counties in Nevada, so we are making good progress at reaching each within a few years. The Committee is also learning from the county officials about their frustrations in dealing with the state and federal bureaucracies. Success is documented by the mitigation projects that FEMA has funded.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Umatilla Indian Reservation Wildlife Program
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
Vegetation and other development options for mitigating urban air pollution impacts
In addition to installing air pollution control devices and reducing emissions activities, urban air pollution can be further mitigated through planning and design strategies including vegetation planting, building design, installing roadside and near source structures, and modif...
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Flood Mitigation Plan approval..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...
A Comprehensive Approach to Emergency Planning
ERIC Educational Resources Information Center
Worsley, Tracy L.; Beckering, Don
2007-01-01
It is essential that the traditional emergency management structure be used as a framework for higher education emergency planning. The four phases of emergency management should be reflected in the architecture of all planning efforts. These include "preparedness," "response," "mitigation," and "recovery."…
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION... each State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
44 CFR 78.3 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... State through the annual Cooperative Agreements; (2) Approve Flood Mitigation Plans in accordance with... Planning and Projects Grants; (2) Prepare and submit the Flood Mitigation Plan; (3) Implement all approved...
50 CFR 216.275 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
...; State/Local/Tribal Hazard Mitigation Plans AGENCY: Federal Emergency Management Agency, DHS. ACTION... . SUPPLEMENTARY INFORMATION: Collection of Information Title: State/Local/Tribal Hazard Mitigation Plans. Type of... Tribal Hazard Mitigation Plan requirements is to support the administration of FEMA Mitigation grant...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION GRANTS § 79.6 Eligibility... develop or update the flood portion of any mitigation plan. Planning grants are not eligible for funding... requirement. (1) States must have an approved State Mitigation Plan meeting the requirements of §§ 201.4 or...
Hungry Horse Mitigation; Flathead Lake, 2001-2002 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry
2003-06-09
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Councilmore » in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the interconnected Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of potential mitigation strategies. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-6.« less
L-325 Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
2008-09-30
This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades. It includes time-zero monitoring results for planting activities conducted in January 2008, annual survival monitoring for all planting years (2007 and 2008), and recommendations for the successful completion of DOE habitat mitigation commitments for this project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Umatilla Indian Reservation Wildlife Program
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to protect, enhance, and mitigate wildlife and wildlife habitat and watershed resources in the Iskuulpa Watershed. The Iskuulpa Watershed Project was approved as a Columbia River Basin Wildlife Fish and Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1998. Iskuulpa will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the John Day and McNary Hydroelectric facilities on the Columbia River. By funding the enhancement and operation and maintenance of the Iskuulpa Watershed, BPA will receivemore » credit towards their mitigation debt. The purpose of the Iskuulpa Watershed management plan update is to provide programmatic and site-specific standards and guidelines on how the Iskuulpa Watershed will be managed over the next three years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management.« less
Vegetation and other development options for mitigating urban air pollution impacts
Richard Baldauf; David J. Nowak
2014-01-01
While air pollution control devices and programs are the primary method of reducing emissions, urban air pollution can be further mitigated through planning and design strategies, including vegetation preservation and planting, building design and development, installing roadside and near-source structures, and modifying surrounding terrain features.
NASA Astrophysics Data System (ADS)
Adila, I.; Dewi, W. W. A.; Tamitiadini, D.; Syauki, W. R.
2017-06-01
This study wants to address on how communication science is applied to Disaster Mitigation Plan. Especially, the implementation of Community Media and Development of Communication Technology that synergize to create a Disaster Mitigation Medium, which is appropriate for typology of Indonesia. Various levels of priorities that include disaster mitigation information, namely, increasing chain system of early warning systems, building evacuation, improving alertness and capacity to face a disaster, as well as minimizing disaster risk factor. Through this concept, mitigation actions plan of Tulungagung Coastal areas is expected to be applied in other regions in Indonesia by BNPB (Badan Nasional Penanggulangan Bencana). Having this strategy to be implemented based on region characteristics, it is expected that risk reduction process can be run optimally. As a result, the strategy is known as Community-Based Disaster Risk Reduction (PRBBK), which means as the organized-efforts by society for pra-, during, and post- disaster by using available resources as much as possible to prevent, reduce, avoid, and recover from the impact of disasters. Therefore, this result can be a Pilot Project for BNBP Indonesia, as a government decisive attitude for the next steps in protecting people residing in the region prone to natural disasters all over Indonesia.
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
44 CFR 78.9 - Planning grant approval process.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-12-01
The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less
2016-01-01
The Intergovernmental Panel on Climate Change (IPCC) has made it clear that anthropogenic greenhouse gasses are the main cause of observed global warming that leads to climate change. Climate change is now a global reality. In the South African political set-up, local municipalities are the structures that are in direct contact with communities and they draw up Integrated Development Plans (IDPs), which are reviewed and upgraded annually. The article seeks to investigate the extent to which climate change adaptation and mitigation strategies are embedded IDPs in seven vulnerable municipalities in the Limpopo Province. The article conducted an in-depth content analysis of the IDPs of the seven municipalities and the results have revealed that these municipalities have not included adaptation and mitigation strategies adequately in their IDPs despite being the most vulnerable municipalities in the province. The article concludes that these municipalities have not as yet institutionalised climate change in their daily operations, planning and decision making. To this end, the paper recommends that local municipalities should include climate change adaptation and mitigation strategies in their IDPs.
IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.
Carbon stocks of mangroves within the Zambezi River Delta, Mozambique
Christina E. Stringer; Carl C. Trettin; Stanley J. Zarnoch; Wenwu Tang
2015-01-01
Mangroves are well-known for their numerous ecosystem services, including storing a globally significant C pool. There is increasing interest in the inclusion of mangroves in national climate change mitigation and adaptation plans in developing nations as they become involved with incentive programs for climate change mitigation. The quality and precision of data...
Groundwater Interim Measures Work Plan for the Former Chemical Plant
May 2012 Groundwater IMWP, revised per EPA's approval, focuses on the installation of a groundwater containment system to mitigate groundwater migration from the former plant. A prior 2002 work plan is included in its entirety in Appendix B.
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
33 CFR 332.4 - Planning and documentation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the... standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
Portions of two important elk (Cervus elaphus) winter ranges totalling 8749 acres were lost due to the construction of the Hungry Horse Dam hydroelectric facility. This habitat loss decreased the carrying capacity of the both the elk and the mule deer (Odocoileus hemionus). In 1985, using funds from the Bonneville Power Administration (BPA) as authorized by the Northwest Power Act, the Montana Department of Fish, Wildlife and Parks (FWP) completed a wildlife mitigation plan for Hungry Horse Reservoir. This plan identified habitat enhancement of currently-occupied winter range as the most cost-efficient, easily implemented mitigation alternative available to address these large-scalemore » losses of winter range. The Columbia Basin Fish and Wildlife Program, as amended in 1987, authorized BPA to fund winter range enhancement to meet an adjusted goal of 133 additional elk. A 28-month advance design phase of the BPA-funded project was initiated in September 1987. Primary goals of this phase of the project included detailed literature review, identification of enhancement areas, baseline (elk population and habitat) data collection, and preparation of 3-year and 10-year implementation plans. This document will serve as a site-specific habitat and population monitoring plan which outlines our recommendations for evaluating the results of enhancement efforts against mitigation goals. 25 refs., 13 figs., 7 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Yearmore » Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Rainwater project is much more than a wildlife project--it is a watershed project with potential to benefit resources at the watershed scale. Goals and objectives presented in the following sections include both mitigation and non-mitigation related goals and objectives.« less
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...] Francis Proposed Low-Effect Habitat Conservation Plan for the Morro Shoulderband Snail, Los Osos, San Luis... conservation program to minimize and mitigate project activities as described in their low-effect habitat conservation plan. We invite comments from the public on the application, which includes the Francis Low-Effect...
ERIC Educational Resources Information Center
National Oceanic and Atmospheric Administration (DOC), Rockville, MD.
This plan to mitigate the impact of potential geophysical natural disasters, including those caused by hurricanes, tornadoes, floods and earthquakes, integrates and coordinates the multiagency functions in warning services and community preparedness related to many of these disasters. The plan is divided into five sections. The first two sections…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berger, Matthew T.; Judd, Steven L.
This report contains a detailed site-specific management plan for the Hellsgate Winter Range Wildlife Mitigation Project. The report provides background information about the mitigation process, the review process, mitigation acquisitions, Habitat Evaluation Procedures (HEP) and mitigation crediting, current habitat conditions, desired future habitat conditions, restoration/enhancements efforts and maps.
Hungry Horse Mitigation; Flathead Lake, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2005-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Objective 1 in the workplan is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of Objectives 2-8.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2008-12-22
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation; Flathead Lake, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2006-06-01
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the ''Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam'' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hansen, Barry; Evarts, Les
2009-08-06
The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by themore » Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research. Monitoring, for example, includes a spring gillnetting series conducted annually in Flathead Lake and builds on an existing data set initiated in 1981. Monitoring of the experimental kokanee reintroduction was a primary activity of this project between 1992 and 1997. Lake trout, whose high densities have precluded successful mitigation of losses of other species in Flathead Lake, have been monitored since 1996 to measure several biological parameters. Results of this work have utility in determining the population status of this key predator in Flathead Lake. The project has also defined the baseline condition of the Flathead Lake fishery in 1992-1993 and has conducted annual lakewide surveys since 1998. The restoration component of the project has addressed several stream channel, riparian, and fish passage problems, and suppression of non-native fish. The research component of the project began in FY 2000 and measured trophic linkages between M. relicta and other species to assist in predicting the results of our efforts to suppress lake trout. Only Work Element A in the Statement of Work is funded entirely by Hungry Horse Mitigation funds. Additional funds are drawn from other sources to assist in completion of all remaining Work Elements.« less
Desai, Arti D; Jacob-Files, Elizabeth A; Wignall, Julia; Wang, Grace; Pratt, Wanda; Mangione-Smith, Rita; Britto, Maria T
2018-06-05
Shared care plans play an essential role in coordinating care across health care providers and settings for children with medical complexity (CMC). However, existing care plans often lack shared ownership, are out-of-date, and lack universal accessibility. In this study, we aimed to establish requirements for shared care plans to meet the information needs of caregivers and providers and to mitigate current information barriers when caring for CMC. We followed a user-centered design methodology and conducted in-depth semistructured interviews with caregivers and providers of CMC who receive care at a tertiary care children's hospital. We applied inductive, thematic analysis to identify salient themes. Analysis occurred concurrently with data collection; therefore, the interview guide was iteratively revised as new questions and themes emerged. Interviews were conducted with 17 caregivers and 22 providers. On the basis of participant perspectives, we identified 4 requirements for shared care plans that would help meet information needs and mitigate current information barriers when caring for CMC. These requirements included the following: (1) supporting the accessibility of care plans from multiple locations (eg, cloud-based) and from multiple devices, with alert and search features; (2) ensuring the organization is tailored to the specific user; (3) including collaborative functionality such as real-time, multiuser content management and secure messaging; and (4) storing care plans on a secure platform with caregiver-controlled permission settings. Although further studies are needed to understand the optimal design and implementation strategies, shared care plans that meet these specified requirements could mitigate perceived information barriers and improve care for CMC. Copyright © 2018 by the American Academy of Pediatrics.
Hagley, Gregory W; Mills, Peter D; Shiner, Brian; Hemphill, Robin R
2018-04-01
Root cause analyses (RCA) are often completed in health care settings to determine causes of adverse events (AEs). RCAs result in action plans designed to mitigate future patient harm. National reviews of RCA reports have assessed the safety of numerous health care settings and suggested opportunities for improvement. However, few studies have assessed the safety of receiving care from physical therapists, occupational therapists, or speech and language pathology pathologists. The objective of this study was to determine the types of AEs, root causes, and action plans for risk mitigation that exist within the disciplines of rehabilitation medicine. This study is a retrospective, cross-sectional review. A national search of the Veterans Health Administration RCA database was conducted to identify reports describing AEs associated with physical therapy, occupational therapy, or speech and language pathology services between 2009 and May 2016. Twenty-five reports met the inclusion requirements. The reports were classified by the event type, root cause, action plans, and strength of action plans. Delays in care (32.0%) and falls (28.0%) were the most common type of AE. Three AEs resulted in death. RCA teams identified deficits regarding policy and procedures as the most common root cause. Eighty-eight percent of RCA reports included strong or intermediate action plans to mitigate risk. Strong action plans included standardizing emergency terminology and implementing a dedicated line to call for an emergency response. These data are self-reported and only AEs that are scored as a safety assessment code 3 in the system receive a full RCA, so there are likely AEs that were not captured in this study. In addition, the RCA reports are deidentified and so do not include all patient characteristics. As the Veterans Health Administration system services mostly men, the data might not generalize to non-Veterans Health Administration systems with a different patient mix. Care provided by rehabilitation professionals is generally safe, but AEs do occur. Based on this RCA review, the safety of rehabilitation services can be improved by implementing strong practices to mitigate risk to patients. Checklists should be considered to aid timely decision making when initiating an emergency response.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fraley, John J.; Marotz, Brian L.; DosSantos, Joseph M.
In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is onemore » of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and other features necessary for a long-term implementation plan.« less
Optimizing spacecraft design - optimization engine development : progress and plans
NASA Technical Reports Server (NTRS)
Cornford, Steven L.; Feather, Martin S.; Dunphy, Julia R; Salcedo, Jose; Menzies, Tim
2003-01-01
At JPL and NASA, a process has been developed to perform life cycle risk management. This process requires users to identify: goals and objectives to be achieved (and their relative priorities), the various risks to achieving those goals and objectives, and options for risk mitigation (prevention, detection ahead of time, and alleviation). Risks are broadly defined to include the risk of failing to design a system with adequate performance, compatibility and robustness in addition to more traditional implementation and operational risks. The options for mitigating these different kinds of risks can include architectural and design choices, technology plans and technology back-up options, test-bed and simulation options, engineering models and hardware/software development techniques and other more traditional risk reduction techniques.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Louis Militana; Cindy Huber; Christopher Colbert
2005-08-01
This is the second of two articles describing a plan that was developed to mitigate the effects of acid deposition and visibility impairment in four Class I areas from the proposed Longview Power Project. Part I (published in July 2005) discussed the air quality impacts of the proposed coal-fired power plant. Part II discusses the mitigation plan. 2 refs., 1 fig., 3 tabs.
Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.
Jonathan Thompson
2007-01-01
The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoringâthe systematic observation and measurement of a set...
76 FR 78916 - Rice Solar Energy Project Record of Decision (DOE/EIS-0439)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-20
... Protection Plan. The Biological Resources Mitigation Implementation and Monitoring Plan will include accurate... consideration that water is a limited resource, the Project owner would use dry cooling, which avoids... markets and transmits wholesale electrical power through an integrated 17,000-circuit mile, high- voltage...
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010-2015.
Bain, Allison A; Abbott, Anne L; Miller, Laura L
2016-04-14
Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa's, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency's action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peelle, E.; Schweitzer, M.; Scharre, P.
1979-07-01
This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possiblemore » through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.« less
Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bissell, Gael
1985-01-01
This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.
Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrads, T.J.
1997-09-12
Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-19
..., management, maintenance, and monitoring of conservation lands used to mitigate the effects of the other.... The LOHCP is a comprehensive plan designed to provide long-term conservation and management of... Maintenance: Public and private utility company activities to operate and maintain, including repair and...
Lunar Dust Mitigation Technology Development
NASA Technical Reports Server (NTRS)
Hyatt, Mark J.; Deluane, Paul B.
2008-01-01
NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.
Hungry Horse Dam Fisheries Mitigation, 1992-1993 Progress Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
DosSantos, Joe; Vashro, Jim; Lockard, Larry
1994-06-01
In February of 1900, over forty agency representatives and interested citizens began development of the 1991 Mitigation Plan. This effort culminated in the 1993 Implementation Plan for mitigation of fish losses attributable to the construction and operation of Hungry Horse Dam. The primary purpose of this biennial report is to inform the public of the status of ongoing mitigation activities resulting from those planning efforts. A habitat improvement project is underway to benefit bull trout in Big Creek in the North Fork drainage of the Flathead River and work is planned in Hay Creek, another North Fork tributary. Bull troutmore » redd counts have been expanded and experimental programs involving genetic evaluation, outmigrant monitoring, and hatchery studies have been initiated, Cutthroat mitigation efforts have focused on habitat improvements in Elliott Creek and Taylor`s Outflow and improvements have been followed by imprint plants of hatchery fish and/or eyed eggs in those streams. Rogers Lake west of Kalispell and Lion Lake, near Hungry Horse, were chemically rehabilitated. Cool and warm water fish habitat has been improved in Halfmoon Lake and Echo Lake. Public education and public interest is important to the future success of mitigation activities. As part of the mitigation team`s public awareness responsibility we have worked with numerous volunteer groups, public agencies, and private landowners to stimulate interest and awareness of mitigation activities and the aquatic ecosystem. The purpose of this biennial report is to foster public awareness of, and support for, mitigation activities as we move forward in implementing the Hungry Horse Dam Fisheries Mitigation Implementation Plan.« less
44 CFR 78.6 - Flood Mitigation Plan approval process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... approval process. 78.6 Section 78.6 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood... reasons for non-approval and offer suggestions for improvement. ...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY... that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
44 CFR 201.5 - Enhanced State Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Enhanced State Mitigation Plans. 201.5 Section 201.5 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY...) Demonstration that the plan is integrated to the extent practicable with other State and/or regional planning...
Crew Communication as a Factor in Aviation Accidents
NASA Technical Reports Server (NTRS)
Goguen, J.; Linde, C.; Murphy, M.
1986-01-01
The crew communication process is analyzed. Planning and explanation are shown to be well-structured discourse types, described by formal rules. These formal rules are integrated with those describing the other most important discourse type within the cockpit: the command-and-control speech act chain. The latter is described as a sequence of speech acts for making requests (including orders and suggestions), for making reports, for supporting or challenging statements, and for acknowledging previous speech acts. Mitigation level, a linguistic indication of indirectness and tentativeness in speech, was an important variable in several hypotheses, i.e., the speech of subordinates is more mitigated than the speech of superiors, the speech of all crewmembers is less mitigated when they know that they are in either a problem or emergency situation, and mitigation is a factor in failures of crewmembers to initiate discussion of new topics or have suggestions ratified by the captain. Test results also show that planning and explanation are more frequently performed by captains, are done more during crew- recognized problems, and are done less during crew-recognized emergencies. The test results also indicated that planning and explanation are more frequently performed by captains than by other crewmembers, are done more during crew-recognized problems, and are done less during-recognized emergencies.
NASA Technical Reports Server (NTRS)
Adams, Robert B.; LaPointe, Michael; Wilks, Rod; Allen, Brian
2009-01-01
This poster reviews the planning and design for an integrated architecture for characterization, mitigation, scientific evaluation and resource utilization of near earth objects. This includes tracks to observe and characterize the nature of the threat posed by a NEO, and deflect if a significant threat is posed. The observation stack can also be used for a more complete scientific analysis of the NEO.
Kirby, Mark F; Law, Robin J
2010-06-01
A fully integrated and effective response to an oil or chemical spill at sea must include a well planned and executed post-incident assessment of environmental contamination and damage. While salvage, rescue and clean-up operations are generally well considered, including reviews and exercises, the expertise, resources, networks and logistical planning required to achieve prompt and effective post-spill impact assessment and monitoring are not generally well established. The arrangement and co-ordination of post-incident monitoring and impact assessment need to consider sampling design, biological effects, chemical analysis and collection/interpretation of expert local knowledge. This paper discusses the risks, impacts and mitigation options associated with accidental spills and considers the importance of pre-considered impact assessment and monitoring programmes in the wider response cycle. The PREMIAM (Pollution Response in Emergencies: Marine Impact Assessment and Monitoring; www.premiam.org) project is considered as an example of an improved approach to the planning, co-ordination and conduct of post-incident monitoring.
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
43 CFR 10005.16 - Plan content.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan content. 10005.16 Section 10005.16 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.16 Plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.
In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less
Successes and Challenges in Implementation of Radon Control Activities in Iowa, 2010–2015
Abbott, Anne L.; Miller, Laura L.
2016-01-01
Background Radon gas has recently become more prominent in discussions of lung cancer prevention nationally and in Iowa. A review in 2013 of cancer plans in the National Comprehensive Cancer Control Program found that 42% of cancer plans, including Iowa’s, had terminology on radon. Plans included awareness activities, home testing, remediation, policy, and policy evaluation. Community Context Iowa has the highest average radon concentrations in the United States; 70% of homes have radon concentrations above the Environmental Protection Agency’s action levels. Radon control activities in Iowa are led by the Iowa Cancer Consortium, the Iowa Department of Public Health, and the Iowa Radon Coalition. Methods A collaborative approach was used to increase levels of awareness, testing, and (if necessary) mitigation, and to introduce a comprehensive radon control policy in Iowa by engaging partners and stakeholders across the state. Outcome The multipronged approach and collaborative work in Iowa appears to have been successful in increasing awareness: the number of radon tests completed in Iowa increased by 20% from 19,600 in 2009 to 23,500 in 2014, and the number of mitigations completed by certified mitigators increased by 108% from 2,600 to more than 5,400. Interpretation Through collaboration, Iowa communities are engaged in activities that led to increases in awareness, testing, mitigation, and policy. States interested in establishing a similar program should consider a multipronged approach involving multiple entities and stakeholders with different interests and abilities. Improvements in data collection and analysis are necessary to assess impact. PMID:27079648
Social science to improve fuels management: a synthesis of research on collaboration.
Victoria Sturtevant; Margaret Ann Moote; Pamela Jakes; Anthony S. Cheng
2005-01-01
A series of syntheses were commissioned by the USDA Forest Service to aid in fuels mitigation project planning. This synthesis focuses on collaboration research, and offers knowledge and tools to improve collaboration in the planning and implementation of wildland fire and fuels management projects. It covers a variety of topics including benefits of collaboration,...
2009-09-23
hawthorn, buffaloberry and snowberry also are found in the area. In wetland areas, predominant species include Typha sp., smartweed, wild millet, cord...does not straddle the airfield flight line fence. This location will require wetland mitigation for 0.03 wetlands determined to be jurisdictional by... wetlands construction or restoration at either a wetland mitigation bank or a suitable location on base. A formal mitigation plan will be developed
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 15 Commerce and Foreign Trade 3 2013-01-01 2013-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
15 CFR 970.702 - Monitoring and mitigation of environmental effects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Monitoring and mitigation of... Environmental Effects § 970.702 Monitoring and mitigation of environmental effects. (a) Monitoring. If an... monitoring plan as part of the terms, conditions and restrictions developed for each license. The plan will...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
...; State Administrative Plan for the Hazard Mitigation Grant Program AGENCY: Federal Emergency Management...: Collection of Information Title: State Administrative Plan for the Hazard Mitigation Grant Program. Type of... guide that details how the State will administer the Hazard Mitigation Grant Program (HMGP). An approved...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
..., including incrementional lowering and removal of Dream Lake Dam, rehabilitation of drainage ditches in... foreseeable environmental consequences were assessed, and appropriate mitigation measures are incorporated in...
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2011 CFR
2011-01-01
... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion... must include an identification and description of enforceable policies, legal authorities, funding techniques and other techniques that will be used to manage the effects of erosion, including potential...
Kaminski, Michael D; Lee, Sang Don; Magnuson, Matthew
2016-03-15
Nuclear or radiological terrorism in the form of uncontrolled radioactive contamination presents a unique challenge in the field of nuclear decontamination. Potential targets require an immediate decontamination response, or mitigation plan to limit the social and economic impact. To date, experience with urban decontamination of building materials - specifically hard, porous, external surfaces - is limited to nuclear weapon fallout and nuclear reactor accidents. Methods are lacking for performing wide-area decontamination in an urban environment so that in all release scenarios the area may be re-occupied without evaluation and/or restriction. Also lacking is experience in developing mitigation strategies, that is, methods of mitigating contamination and its resultant radiation dose in key areas during the immediate aftermath of an event and after lifesaving operations. To date, the tremendous strategy development effort primarily by the European community has focused on the recovery phase, which extends years beyond the release event. In this review, we summarize the methods and data collected over the past 70 years in the field of hard, external surface decontamination of radionuclide contaminations, with emphasis on methods suitable for response to radiological dispersal devices and their potentially unique physico-chemical characteristics. This review concludes that although a tremendous amount of work has been completed primarily by the European Community (EU) and the United Kingdom (UK), the few studies existing on each technique permit only very preliminary estimates of decontamination factors for various building materials and methods and extrapolation of those values for use in environments outside the EU and UK. This data shortage prevents us from developing an effective and detailed mitigation response plan and remediation effort. Perhaps most importantly, while the data available does include valuable information on the practical aspects of performing the various remediation methods including costs, coverage rates, manpower, pitfalls, etc., it lacks the details on lessons learned, best practices, and standard procedures, for instance, that would be required to develop a mitigation strategy. While the urban decontamination problem is difficult and there is much more research to do, the existing literature provides a framework for a response plan. Using this framework, in conjunction with computer modeling and relevant data collection, can lead to development of appropriate plans and exercises that would permit development of a mitigation and remediation response. Copyright © 2015 Elsevier B.V. All rights reserved.
Introduction to Software Product Line Adoption
2005-09-01
plans • improvement suggestions • risks and mitigation strategies • progress reports • risks and mitigation strategies • adoption plan • funding ... model • organization chart • product line concept of operations (CONOPS) • marketing plan • product proposals • acquisition strategy • organization risk
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2013 CFR
2013-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2010 CFR
2010-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2014 CFR
2014-10-01
... railroad operation or categories of operations on which the product is designed to be used, including train... comprehensive description of all hazards to be addressed in the system design and development, mitigation... the safety assurance concepts used in the product design, including an explanation of the design...
Ager, Alan A; Kline, Jeffrey D; Fischer, A Paige
2015-08-01
We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social science to improve understanding of community-wide risk perceptions and to predict property owners' capacities and willingness to mitigate risk by treating hazardous fuels and reducing the susceptibility of dwellings. In particular, we identify spatial scale mismatches in wildfire mitigation planning and their potential adverse impact on risk mitigation goals. Studies in other fire-prone regions suggest that these scale mismatches are widespread and contribute to continued wildfire dwelling losses. We discuss how risk perceptions and behavior contribute to scale mismatches and how they can be minimized through integrated analyses of landscape wildfire transmission and social factors that describe the potential for collaboration among landowners and land management agencies. These concepts are then used to outline an integrated socioecological planning framework to identify optimal strategies for local community risk mitigation and improve landscape-scale prioritization of fuel management investments by government entities. © 2015 Society for Risk Analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Sarah L; Hotchkiss, Elizabeth L; Bilello, Daniel E
Reliable, safe, and secure electricity is essential for economic and social development and a necessary input for many sectors of the economy. However, electricity generation and associated processes make up a significant portion of global greenhouse gas (GHG) emissions contributing to climate change. Furthermore, electricity systems are vulnerable to climate change impacts - both short-term events and changes over the longer term. This vulnerability presents both near-term and chronic challenges in providing reliable, affordable, equitable, and sustainable energy services. Within this context, developing countries face a number of challenges in the energy sector, including the need to reliably meet growingmore » electricity demand, lessen dependence on imported fuels, expand energy access, and improve stressed infrastructure for fuel supply and electricity transmission. Energy efficiency (EE) and renewable energy (RE) technical solutions described in this paper can bridge action across climate change mitigation and resilience through reducing GHG emissions and supporting electric power sector adaptation to increasing climate risk. Integrated planning approaches, also highlighted in this paper, play an integral role in bringing together mitigation and resilience action under broader frameworks. Through supporting EE and RE deployment and integrated planning approaches, unique to specific national and local circumstances, countries can design and implement policies, strategies, and sectoral plans that unite development priorities, climate change mitigation, and resilience.« less
Susitna Hydroelectric Project: terrestrial environmental workshop and preliminary simulation model
Everitt, Robert R.; Sonntag, Nicholas C.; Auble, Gregory T.; Roelle, James E.; Gazey, William
1982-01-01
The technical feasibility, economic viability, and environmental impacts of a hydroelectric development project in the Susitna River Basin are being studied by Acres American, Inc. on behalf of the Alaska Power Authority. As part of these studies, Acres American recently contracted LGL Alaska Research Associates, Inc. to coordinate the terrestrial environmental studies being performed by the Alaska Department of Fish and Game and, as subcontractors to LGL, several University of Alaska research groups. LGL is responsible for further quantifying the potential impacts of the project on terrestrial wildlife and vegetation, and for developing a plan to mitigate adverse impacts on the terrestrial environment. The impact assessment and mitigation plan will be included as part of a license application to the Federal Energy Regulatory Commission (FERC) scheduled for the first quarter of 1983. The quantification of impacts, mitigation planning, and design of future research is being organized using a computer simulation modelling approach. Through a series of workshops attended by researchers, resource managers, and policy-makers, a computer model is being developed and refined for use in the quantification of impacts on terrestrial wildlife and vegetation, and for evaluating different mitigation measures such as habitat enhancement and the designation of replacement lands to be managed by wildlife habitat. This report describes the preliminary model developed at the first workshop held August 23 -27, 1982 in Anchorage.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Plesko, Catherine S; Clement, R Ryan; Weaver, Robert P
2009-01-01
The mitigation of impact hazards resulting from Earth-approaching asteroids and comets has received much attention in the popular press. However, many questions remain about the near-term and long-term, feasibility and appropriate application of all proposed methods. Recent and ongoing ground- and space-based observations of small solar-system body composition and dynamics have revolutionized our understanding of these bodies (e.g., Ryan (2000), Fujiwara et al. (2006), and Jedicke et al. (2006)). Ongoing increases in computing power and algorithm sophistication make it possible to calculate the response of these inhomogeneous objects to proposed mitigation techniques. Here we present the first phase of amore » comprehensive hazard mitigation planning effort undertaken by Southwest Research Institute and Los Alamos National Laboratory. We begin by reviewing the parameter space of the object's physical and chemical composition and trajectory. We then use the radiation hydrocode RAGE (Gittings et al. 2008), Monte Carlo N-Particle (MCNP) radiation transport (see Clement et al., this conference), and N-body dynamics codes to explore the effects these variations in object properties have on the coupling of energy into the object from a variety of mitigation techniques, including deflection and disruption by nuclear and conventional munitions, and a kinetic impactor.« less
NASA Astrophysics Data System (ADS)
Weiss, S. B.
2013-12-01
The impacts of atmospheric nitrogen deposition on biodiversity are widespread and profound; N-inputs have far exceeded any historical range of variability and are altering ecosystem structure and function worldwide. Overwhelming scientific evidence documents acute threats to numerous California ecosystems and imperiled species through increased growth of invasive annual grasses and forbs, yet policy responses lag far behind the science. Since 2001, a confluence of several projects (gas-fired powerplants and highway improvements) in Santa Clara County set powerful precedents for mitigation of N-deposition impacts on ecosystems via the Endangered Species Act, with a focus on the Bay checkerspot butterfly. These projects have culminated in the Santa Clara Valley Habitat Plan, a 50-year $665,000,000 mitigation plan to conserve and manage habitat for 19 target species. Elsewhere, powerplants in San Diego and Contra Costa Counties have provided mitigation funds for habitat restoration and weed management. Building on these precedents, the California Invasive Plant Council, California Native Plant Society, and other groups are forming a coalition to extend this mitigation across California to generate money for weed management. Key elements of this incipient campaign include: 1) education of regulatory agencies, activists, and decision-makers about the threat; 2) generation of standard EIR comments with project specifics for developments that increase traffic or generate nitrogen emissions; 3) encouraging state and federal wildlife agencies to raise the issue in consultations and Habitat Conservation Plans; 4) policy and legal research to chart a course through the regulatory and political landscape; 5) collating research on impacts and development of tools to document those impacts; 6) media outreach, and 7) coalition building. The main mitigation strategy is funding for local weed management and stewardship groups through fees. There is a desperate need for stable long-term funding of weed management on parks, preserves and other wildlands, and mitigating N-deposition could provide one major source.
A fast-paced delivery of approaches developed in EPA partnerships to enable effective inclusion of environmental and social resilience into hazard mitigation planning. This presentation will cover a broad spectrum, from 1) EPA’s role in mitigation, 2) what a Regional Resil...
ERIC Educational Resources Information Center
Peelle, Elizabeth
The Hartsville, Tennessee nuclear reactor site, the coal plant at Wheatland, Wyoming, and the nuclear plant at Skagit, Washington have mitigation plans developed in response to a federal, state, and local regulatory agency, respectively; the three mitigation plans aim at internalizing community-level social costs and benefits during the…
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2012 CFR
2012-10-01
... product components and their physical relationship in the subsystem or system; (2) A description of the... in § 236.909 and appendix B to this part; (8) A hazard mitigation analysis, including a complete and... principles and assumptions; (11) A human factors analysis, including a complete description of all human...
49 CFR 236.907 - Product Safety Plan (PSP).
Code of Federal Regulations, 2011 CFR
2011-10-01
... product components and their physical relationship in the subsystem or system; (2) A description of the... in § 236.909 and appendix B to this part; (8) A hazard mitigation analysis, including a complete and... principles and assumptions; (11) A human factors analysis, including a complete description of all human...
National Wetlands Mitigation Action Plan
On December 26, 2002, EPA and the Corps of Engineers announced the release of a comprehensive, interagency National Wetlands Mitigation Action Plan to further achievement of the goal of no net loss of wetlands.
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... mitigation activities, and agencies that have the authority to regulate development, as well as businesses...; (C) A general description of land uses and development trends within the tribal planning area so that...
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2013 CFR
2013-10-01
... resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... mitigation as well as to development in hazard-prone areas; a discussion of State funding capabilities for... identified. (iv) Identification of current and potential sources of Federal, State, local, or private funding...
South Fork of the Santa Clara River, Santa Clarita Valley, California. Supplement.
1985-01-01
prime and unique farmland. Mitigation measures for the revised plan include the maintenance and preservation of about 8.3 acres of riparian, 2.7 acres of...the need to enhance and preserve the environment and the need to protect the residents of the area from flood hazards. 1.07 Positive environmental...aspects of the plan include the followingi 1. The preservation of 14.5 acres of land within the project right-of- way adjacent to and upstream of the
Planning Tools For Seismic Risk Mitigation. Rules And Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
De Paoli, Rosa Grazia
2008-07-08
Recently, Italian urban planning research in the field of seismic risk mitigation are renewing. In particular, it promotes strategies that integrate urban rehabilitation and aseismic objectives, and also politicizes that are directed to revitalizes urban systems, coupling physical renewal and socio-economic development.In Italy the first law concerning planning for seismic mitigation dates back 1974, the law n. 64 'Regulation for buildings with particular rules for the seismic areas' where the rules for buildings in seismic areas concerning also the local hazard. This law, in fact, forced the municipalities to acquire, during the formation of the plans, a preventive opinion ofmore » compatibility between planning conditions and geomorphology conditions of the territory. From this date the conviction that the seismic risk must be considered inside the territorial planning especially in terms of strategies of mitigation has been strengthened.The town planners have started to take an interest in seismic risk in the [80]s when the Irpinia's earthquake took place. The researches developed after this earthquake have established that the principal cause of the collapse of buildings are due to from the wrong location of urban settlements (on slopes or crowns) After Irpinia's earthquake the first researches on seismic risk mitigation, in particular on the aspects related to the hazards and to the urban vulnerability were made.« less
L-325 Sagebrush Habitat Mitigation Project: FY2009 Compensation Area Monitoring Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Sackschewsky, Michael R.
2009-09-29
Annual monitoring in support of the Fluor Daniel Hanford Company (Fluor) Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades was conducted in June 2009. MAP guidelines defined mitigation success for this project as 3000 established sagebrush transplants on a 4.5 ha mitigation site after five monitoring years. Annual monitoring results suggest that an estimated 2130 sagebrush transplants currently grow on the site. Additional activities in support of this project included gathering sagebrush seed and securing a local grower to produce between 2250 and 2500 10-in3 tublings for outplanting during the early winter months of FY2010. If the minimummore » number of seedlings grown for this planting meets quality specifications, and planting conditions are favorable, conservative survival estimates indicate the habitat mitigation goals outlined in the MAP will be met in FY2014.« less
Development by Design in Colombia: Making Mitigation Decisions Consistent with Conservation Outcomes
Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph
2013-01-01
Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition. PMID:24339972
Saenz, Shirley; Walschburger, Tomas; González, Juan Carlos; León, Jorge; McKenney, Bruce; Kiesecker, Joseph
2013-01-01
Mitigation policy and regulatory frameworks are consistent in their strong support for the mitigation hierarchy of: (1) avoiding impacts, (2) minimizing impacts, and then (3) offsetting/compensating for residual impacts. While mitigation frameworks require developers to avoid, minimize and restore biodiversity on-site before considering an offset for residual impacts, there is a lack of quantitative guidance for this decision-making process. What are the criteria for requiring impacts be avoided altogether? Here we examine how conservation planning can guide the application of the mitigation hierarchy to address this issue. In support of the Colombian government's aim to improve siting and mitigation practices for planned development, we examined five pilot projects in landscapes expected to experience significant increases in mining, petroleum and/or infrastructure development. By blending landscape-level conservation planning with application of the mitigation hierarchy, we can proactively identify where proposed development and conservation priorities would be in conflict and where impacts should be avoided. The approach we outline here has been adopted by the Colombian Ministry of Environment and Sustainable Development to guide licensing decisions, avoid piecemeal licensing, and promote mitigation decisions that maintain landscape condition.
A dynamic model for costing disaster mitigation policies.
Altay, Nezih; Prasad, Sameer; Tata, Jasmine
2013-07-01
The optimal level of investment in mitigation strategies is usually difficult to ascertain in the context of disaster planning. This research develops a model to provide such direction by relying on cost of quality literature. This paper begins by introducing a static approach inspired by Joseph M. Juran's cost of quality management model (Juran, 1951) to demonstrate the non-linear trade-offs in disaster management expenditure. Next it presents a dynamic model that includes the impact of dynamic interactions of the changing level of risk, the cost of living, and the learning/investments that may alter over time. It illustrates that there is an optimal point that minimises the total cost of disaster management, and that this optimal point moves as governments learn from experience or as states get richer. It is hoped that the propositions contained herein will help policymakers to plan, evaluate, and justify voluntary disaster mitigation expenditures. © 2013 The Author(s). Journal compilation © Overseas Development Institute, 2013.
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
43 CFR 10005.8 - Mitigation obligations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Mitigation obligations. 10005.8 Section... MITIGATION AND CONSERVATION COMMISSION POLICIES AND PROCEDURES FOR DEVELOPING AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.8 Mitigation obligations. While the Act authorizes the...
Sharing international experiences in disasters: summary and action plan.
Andrews, R A; Austin, C; Brown, R; Chen, Y Z; Engindeniz, Z; Girouard, R; Leaman, P; Masellis, M; Nakayama, S; Polentsov, Y O; Suserud, B O
2001-01-01
The discussions in this theme provided an opportunity to share specific experiences with disasters that occurred outside of the Asia-Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 7 and Theme 3 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) disaster response planning, (2) predetermined command and organizational structure, (3) rapid response capability, (4) mitigation, and (5) communications and alternatives. The action plans presented are in common with those presented by Theme 3, and include: (1) plan disaster responses including the different types, identification of hazards, training based on experiences, and provision of public education; (2) improving coordination and control; (3) maintaining communications assuming infrastructure breakdown; (4) maximizing mitigation through standardized evaluations, creation of a legal framework, and recognition of advocacy and public participation; and (5) providing resources and knowledge through access to existing therapies, using the media, and increasing decentralization of hospital inventories. Most of the problems that occurred outside the Asia-Pacific rim relative to disaster management are similar to those experienced within it. They should be addressed in common with the rest of the world.
Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua
2010-11-01
Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.
Wetland Mitigation Monitoring at the Fernald Preserve - 13200
DOE Office of Scientific and Technical Information (OSTI.GOV)
Powell, Jane; Bien, Stephanie; Decker, Ashlee
The U.S. Department of Energy is responsible for 7.2 hectares (17.8 acres) of mitigation wetland at the Fernald Preserve, Ohio. Remedial activities affected the wetlands, and mitigation plans were incorporated into site-wide ecological restoration planning. In 2008, the Fernald Natural Resource Trustees developed a comprehensive wetland mitigation monitoring approach to evaluate whether compensatory mitigation requirements have been met. The Fernald Preserve Wetland Mitigation Monitoring Plan provided a guideline for wetland evaluations. The Ohio Environmental Protection Agency (Ohio EPA) wetland mitigation monitoring protocols were adopted as the means for compensatory wetland evaluation. Design, hydrologic regime, vegetation, wildlife, and biogeochemistry were evaluatedmore » from 2009 to 2011. Evaluations showed mixed results when compared to the Ohio EPA performance standards. Results of vegetation monitoring varied, with the best results occurring in wetlands adjacent to forested areas. Amphibians, particularly ambystomatid salamanders, were observed in two areas adjacent to forested areas. Not all wetlands met vegetation performance standards and amphibian biodiversity metrics. However, Fernald mitigation wetlands showed substantially higher ratings compared to other mitigated wetlands in Ohio. Also, soil sampling results remain consistent with other Ohio mitigated wetlands. The performance standards are not intended to be 'pass/fail' criteria; rather, they are reference points for use in making decisions regarding future monitoring and maintenance. The Trustees approved the Fernald Preserve Wetland Mitigation Monitoring Report with the provision that long-term monitoring of the wetlands continues at the Fernald Preserve. (authors)« less
Preventing a data breach from becoming a disaster.
Goldberg, Ed
2013-01-01
Organisations have traditionally dealt with data breaches by investing in protective measures without a great deal of attention to mitigation of breach consequences and response. Conversely, business continuity (BC) planning has traditionally focused on mitigating disasters, not on preventing them. From a BC planning perspective, organisations need to assume that a data breach is inevitable and plan accordingly. The spate of data breaches in these past few years hit many organisations that were well protected. Those that suffered disastrous consequences as a result of a data breach lacked effective mitigation and response, not protection. The complexity and speed of an effective data breach response require that detailed planning takes place in advance of a breach.
1995-11-01
based on established and incentive for Delta compliance. functioning replacement wetlands. Perhaps the most compelling reason given for why The permit...developed mitigation plans powerful incentive for ventures to carefully site, for the Cricket Creek site in accordance with the plan, and execute the...Opportunity. Lev, Esther (with field assistance by Peter Zika ) for the Lane County Council of Governments, 1988 (revised 1990), Preliminary Inventory of
Wright, Curtis; Schnoll, Sidney; Bernstein, David
2008-10-01
Risk evaluation and mitigation strategies (REMS) formerly known as Risk Minimization Action Plans (RiskMAPs) are a regulatory technique for dealing with anticipated risks of new medications and are especially important for new drugs with abuse potential. This paper describes the origin and history of risk-management plans for drugs that might be abused, the proper use of these plans in minimizing the risk to the public, and the special difficulties inherent in managing risks for drugs with abuse potential. Drugs with abuse liability are distinctive since the risks inherent in manufacture and distribution include not only risks to patients prescribed the medications, but also risks to the general public including subgroups in the population not intended to get the drug and who receive no medical benefit from the medication. The crafting of risk-management plans intended to protect nonpatient populations is unique for these products. The content, extent, and level of intensity of these plans affect areas of medical ethics, civil liability, and criminal prosecution. The need for risk-management plans for drugs with abuse liability can potentially act as a deterrent to investment and is a factor in decisions concerning the development of new medications for the treatments of pain, ADHD, anxiety disorders, and addictions. This paper provides a framework for moving the process of REMS development forward and criteria for evaluating the probity and adequacy of such programs.
Problems with mitigation translocation of herpetofauna.
Sullivan, Brian K; Nowak, Erika M; Kwiatkowski, Matthew A
2015-02-01
Mitigation translocation of nuisance animals is a commonly used management practice aimed at resolution of human-animal conflict by removal and release of an individual animal. Long considered a reasonable undertaking, especially by the general public, it is now known that translocated subjects are negatively affected by the practice. Mitigation translocation is typically undertaken with individual adult organisms and has a much lower success rate than the more widely practiced conservation translocation of threatened and endangered species. Nonetheless, the public and many conservation practitioners believe that because population-level conservation translocations have been successful that mitigation translocation can be satisfactorily applied to a wide variety of human-wildlife conflict situations. We reviewed mitigation translocations of reptiles, including our own work with 3 long-lived species (Gila monsters [Heloderma suspectum], Sonoran desert tortoises [Gopherus morafkai], and western diamond-backed rattlesnakes [Crotalus atrox]). Overall, mitigation translocation had a low success rate when judged either by effects on individuals (in all studies reviewed they exhibited increased movement or increased mortality) or by the success of the resolution of the human-animal conflict (translocated individuals often returned to the capture site). Careful planning and identification of knowledge gaps are critical to increasing success rates in mitigation translocations in the face of increasing pressure to find solutions for species threatened by diverse anthropogenic factors, including climate change and exurban and energy development. © 2014 Society for Conservation Biology.
A Global Mitigation Hierarchy for Nature Conservation
Bull, Joseph W; Addison, Prue F E; Burgass, Michael J; Gianuca, Dimas; Gorham, Taylor M; Jacob, Céline; Watson, James E M; Wilcox, Chris; Milner-Gulland, E J
2018-01-01
Abstract Efforts to conserve biodiversity comprise a patchwork of international goals, national-level plans, and local interventions that, overall, are failing. We discuss the potential utility of applying the mitigation hierarchy, widely used during economic development activities, to all negative human impacts on biodiversity. Evaluating all biodiversity losses and gains through the mitigation hierarchy could help prioritize consideration of conservation goals and drive the empirical evaluation of conservation investments through the explicit consideration of counterfactual trends and ecosystem dynamics across scales. We explore the challenges in using this framework to achieve global conservation goals, including operationalization and monitoring and compliance, and we discuss solutions and research priorities. The mitigation hierarchy's conceptual power and ability to clarify thinking could provide the step change needed to integrate the multiple elements of conservation goals and interventions in order to achieve successful biodiversity outcomes. PMID:29731513
36 CFR 219.8 - Sustainability.
Code of Federal Regulations, 2014 CFR
2014-07-01
... as natural succession, wildland fire, invasive species, and climate change; and the ability of terrestrial and aquatic ecosystems on the plan area to adapt to change. (v) Wildland fire and opportunities to... other sources of drinking water (including guidance to prevent or mitigate detrimental changes in...
36 CFR 219.8 - Sustainability.
Code of Federal Regulations, 2012 CFR
2012-07-01
... as natural succession, wildland fire, invasive species, and climate change; and the ability of terrestrial and aquatic ecosystems on the plan area to adapt to change. (v) Wildland fire and opportunities to... other sources of drinking water (including guidance to prevent or mitigate detrimental changes in...
36 CFR 219.8 - Sustainability.
Code of Federal Regulations, 2013 CFR
2013-07-01
... as natural succession, wildland fire, invasive species, and climate change; and the ability of terrestrial and aquatic ecosystems on the plan area to adapt to change. (v) Wildland fire and opportunities to... other sources of drinking water (including guidance to prevent or mitigate detrimental changes in...
Defense Advanced Research Projects Agency: Strategic Plan
2009-05-01
technologies to detect, prevent, or mitigate asymmetric attacks, including suicide bombers, improvised explosive devices, and weapons of mass destruction...the Army’s Command Post of the Future (CPOF) to amplify the capabilities of overworked combat command and control staffs. Working with CPOF, PAL
Alan A. Ager; Jeffrey D. Kline; A. Paige Fisher
2015-01-01
We describe recent advances in biophysical and social aspects of risk and their potential combined contribution to improve mitigation planning on fire-prone landscapes. The methods and tools provide an improved method for defining the spatial extent of wildfire risk to communities compared to current planning processes. They also propose an expanded role for social...
Effects of urban form on the urban heat island effect based on spatial regression model.
Yin, Chaohui; Yuan, Man; Lu, Youpeng; Huang, Yaping; Liu, Yanfang
2018-09-01
The urban heat island (UHI) effect is becoming more of a concern with the accelerated process of urbanization. However, few studies have examined the effect of urban form on land surface temperature (LST) especially from an urban planning perspective. This paper used spatial regression model to investigate the effects of both land use composition and urban form on LST in Wuhan City, China, based on the regulatory planning management unit. Landsat ETM+ image data was used to estimate LST. Land use composition was calculated by impervious surface area proportion, vegetated area proportion, and water proportion, while urban form indicators included sky view factor (SVF), building density, and floor area ratio (FAR). We first tested for spatial autocorrelation of urban LST, which confirmed that a traditional regression method would be invalid. A spatial error model (SEM) was chosen because its parameters were better than a spatial lag model (SLM). The results showed that urban form metrics should be the focus for mitigation efforts of UHI effects. In addition, analysis of the relationship between urban form and UHI effect based on the regulatory planning management unit was helpful for promoting corresponding UHI effect mitigation rules in practice. Finally, the spatial regression model was recommended to be an appropriate method for dealing with problems related to the urban thermal environment. Results suggested that the impact of urbanization on the UHI effect can be mitigated not only by balancing various land use types, but also by optimizing urban form, which is even more effective. This research expands the scientific understanding of effects of urban form on UHI by explicitly analyzing indicators closely related to urban detailed planning at the level of regulatory planning management unit. In addition, it may provide important insights and effective regulation measures for urban planners to mitigate future UHI effects. Copyright © 2018 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gray, J; Lukose, R; Bronson, J
2015-06-15
Purpose: To conduct a failure mode and effects analysis (FMEA) as per AAPM Task Group 100 on clinical processes associated with teletherapy, and the development of mitigations for processes with identified high risk. Methods: A FMEA was conducted on clinical processes relating to teletherapy treatment plan development and delivery. Nine major processes were identified for analysis. These steps included CT simulation, data transfer, image registration and segmentation, treatment planning, plan approval and preparation, and initial and subsequent treatments. Process tree mapping was utilized to identify the steps contained within each process. Failure modes (FM) were identified and evaluated with amore » scale of 1–10 based upon three metrics: the severity of the effect, the probability of occurrence, and the detectability of the cause. The analyzed metrics were scored as follows: severity – no harm = 1, lethal = 10; probability – not likely = 1, certainty = 10; detectability – always detected = 1, undetectable = 10. The three metrics were combined multiplicatively to determine the risk priority number (RPN) which defined the overall score for each FM and the order in which process modifications should be deployed. Results: Eighty-nine procedural steps were identified with 186 FM accompanied by 193 failure effects with 213 potential causes. Eighty-one of the FM were scored with a RPN > 10, and mitigations were developed for FM with RPN values exceeding ten. The initial treatment had the most FM (16) requiring mitigation development followed closely by treatment planning, segmentation, and plan preparation with fourteen each. The maximum RPN was 400 and involved target delineation. Conclusion: The FMEA process proved extremely useful in identifying previously unforeseen risks. New methods were developed and implemented for risk mitigation and error prevention. Similar to findings reported for adult patients, the process leading to the initial treatment has an associated high risk.« less
Resilience Mitigation Financing Webinar for Water and Wastewater Utilities
The Resilience Mitigation Financing for Water and Wastewater Utilities webinar focuses on tools and financing resources to conduct resilience planning and to mitigate impacts before a disaster strikes.
Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2005-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine themore » biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.« less
Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, Jay; Garrow, Larry
2004-06-01
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determinemore » the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... modification of those projects to optimize performance. It includes the selection of appropriate measures that... fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument that meets...
Code of Federal Regulations, 2010 CFR
2010-07-01
... guides modification of those projects to optimize performance. It includes the selection of appropriate... approved in-lieu fee program that are available for sale prior to being fulfilled in accordance with an approved mitigation project plan. Advance credit sales require an approved in-lieu fee program instrument...
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2012 CFR
2012-01-01
... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2013 CFR
2013-01-01
... (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE OCEAN AND COASTAL... effects of, and studying and evaluating ways to control, or lessen the impact of, shoreline erosion, including potential impacts of sea level rise, and to restore areas adversely affected by such erosion. This...
Contamination Mitigation Strategies for Long Duration Human Spaceflight Missions
NASA Technical Reports Server (NTRS)
Lewis, Ruthan; Lupisella, Mark; Bleacher, Jake; Farrell, William
2017-01-01
Contamination control issues are particularly challenging for long-term human spaceflight and are associated with the search for life, dynamic environmental conditions, human-robotic-environment interaction, sample collection and return, biological processes, waste management, long-term environmental disturbance, etc. These issues impact mission success, human health, planetary protection, and research and discovery. Mitigation and control techniques and strategies may include and integrate long-term environmental monitoring and reporting, contamination control and planetary protection protocols, habitation site design, habitat design, and surface exploration and traverse pathways and area access planning.
Is wetland mitigation successful in Southern California?
NASA Astrophysics Data System (ADS)
Cummings, D. L.; Rademacher, L. K.
2004-12-01
Wetlands perform many vital functions within their landscape position; they provide unique habitats for a variety of flora and fauna and they act as treatment systems for upstream natural and anthropogenic waste. California has lost an estimated 91% of its wetlands. Despite the 1989 "No Net Loss" policy and mitigation requirements by the regulatory agencies, the implemented mitigation may not be offsetting wetlands losses. The "No Net Loss" policy is likely failing for numerous reasons related to processes in the wetlands themselves and the policies governing their recovery. Of particular interest is whether these mitigation sites are performing essential wetlands functions. Specific questions include: 1) Are hydric soil conditions forming in mitigation sites; and, 2) are the water quality-related chemical transformations that occur in natural wetlands observed in mitigation sites. This study focuses on success (or lack of success) in wetlands mitigation sites in Southern California. Soil and water quality investigations were conducted in wetland mitigation sites deemed to be successful by vegetation standards. Observations of the Standard National Resource Conservation Service field indicators of reducing conditions were made to determine whether hydric soil conditions have developed in the five or more years since the implementation of mitigation plans. In addition, water quality measurements were performed at the inlet and outlet of these mitigation sites to determine whether these sites perform similar water quality transformations to natural wetlands within the same ecosystem. Water quality measurements included nutrient, trace metal, and carbon species measurements. A wetland location with minimal anthropogenic changes and similar hydrologic and vegetative features was used as a control site. All sites selected for study are within a similar ecosystem, in the interior San Diego and western Riverside Counties, in Southern California.
Reducing emissions from agriculture to meet the 2 °C target.
Wollenberg, Eva; Richards, Meryl; Smith, Pete; Havlík, Petr; Obersteiner, Michael; Tubiello, Francesco N; Herold, Martin; Gerber, Pierre; Carter, Sarah; Reisinger, Andrew; van Vuuren, Detlef P; Dickie, Amy; Neufeldt, Henry; Sander, Björn O; Wassmann, Reiner; Sommer, Rolf; Amonette, James E; Falcucci, Alessandra; Herrero, Mario; Opio, Carolyn; Roman-Cuesta, Rosa Maria; Stehfest, Elke; Westhoek, Henk; Ortiz-Monasterio, Ivan; Sapkota, Tek; Rufino, Mariana C; Thornton, Philip K; Verchot, Louis; West, Paul C; Soussana, Jean-François; Baedeker, Tobias; Sadler, Marc; Vermeulen, Sonja; Campbell, Bruce M
2016-12-01
More than 100 countries pledged to reduce agricultural greenhouse gas (GHG) emissions in the 2015 Paris Agreement of the United Nations Framework Convention on Climate Change. Yet technical information about how much mitigation is needed in the sector vs. how much is feasible remains poor. We identify a preliminary global target for reducing emissions from agriculture of ~1 GtCO 2 e yr -1 by 2030 to limit warming in 2100 to 2 °C above pre-industrial levels. Yet plausible agricultural development pathways with mitigation cobenefits deliver only 21-40% of needed mitigation. The target indicates that more transformative technical and policy options will be needed, such as methane inhibitors and finance for new practices. A more comprehensive target for the 2 °C limit should be developed to include soil carbon and agriculture-related mitigation options. Excluding agricultural emissions from mitigation targets and plans will increase the cost of mitigation in other sectors or reduce the feasibility of meeting the 2 °C limit. © 2016 The Authors Global Change Biology Published by John Wiley & Sons Ltd.
Implementation of Risk Management in NASA's CEV Project- Ensuring Mission Success
NASA Astrophysics Data System (ADS)
Perera, Jeevan; Holsomback, Jerry D.
2005-12-01
Most project managers know that Risk Management (RM) is essential to good project management. At NASA, standards and procedures to manage risk through a tiered approach have been developed - from the global agency-wide requirements down to a program or project's implementation. The basic methodology for NASA's risk management strategy includes processes to identify, analyze, plan, track, control, communicate and document risks. The identification, characterization, mitigation plan, and mitigation responsibilities associated with specific risks are documented to help communicate, manage, and effectuate appropriate closure. This approach helps to ensure more consistent documentation and assessment and provides a means of archiving lessons learned for future identification or mitigation activities.A new risk database and management tool was developed by NASA in 2002 and since has been used successfully to communicate, document and manage a number of diverse risks for the International Space Station, Space Shuttle, and several other NASA projects and programs including at the Johnson Space Center. Organizations use this database application to effectively manage and track each risk and gain insight into impacts from other organization's viewpoint to develop integrated solutions. Schedule, cost, technical and safety issues are tracked in detail through this system.Risks are tagged within the system to ensure proper review, coordination and management at the necessary management level. The database is intended as a day-to- day tool for organizations to manage their risks and elevate those issues that need coordination from above. Each risk is assigned to a managing organization and a specific risk owner who generates mitigation plans as appropriate. In essence, the risk owner is responsible for shepherding the risk through closure. The individual that identifies a new risk does not necessarily get assigned as the risk owner. Whoever is in the best position to effectuate comprehensive closure is assigned as the risk owner. Each mitigation plan includes the specific tasks that will be conducted to either decrease the likelihood of the risk occurring and/or lessen the severity of the consequences if they do occur. As each mitigation task is completed, the responsible managing organization records the completion of the task in the risk database and then re-scores the risk considering the task's results. By keeping scores updated, a managing organization's current top risks and risk posture can be readily identified including the status of any risk in the system.A number of metrics measure risk process trends from data contained in the database. This allows for trend analysis to further identify improvements to the process and assist in the management of all risks. The metrics will also scrutinize both the effectiveness and compliance of risk management requirements.The risk database is an evolving tool and will be continuously improved with capabilities requested by the NASA project community. This paper presents the basic foundations of risk management, the elements necessary for effective risk management, and the capabilities of this new risk database and how it is implemented to support NASA's risk management needs.
DOT National Transportation Integrated Search
2016-08-23
Wyoming is home to abundant big game, including long-distance migratory species such as mule deer, elk, and pronghorn. Where these animals movement patterns intersect with roads, vehicles often hit animals. This poses a threat both to highway safe...
Unique challenges facing Southwestern tribes: Chapter 17
Hiza, Margaret; Chief, Karletta; Bemis, Kirk; Gautam, Mahesh; Middleton, Beth Rose; Tsosie, Rebecca
2013-01-01
•\tTribes are taking action to address climate change by instituting climate-change mitigation initiatives, including utility-scale, alternative-energy projects, and energy-conservation projects. Tribes are also evaluating their existing capacity to engage in effective adaptation planning, even though financial and social capital is limited.
DOT National Transportation Integrated Search
2016-06-01
This literature review will confirm prior work in the use of locomotive airbag technologies for vehicle or pedestrian collision : mitigation, and to focus planned activities and tasks for this research. The state of the art in relevant technologies h...
We update and reevaluate the scientific information on the distribution, history and causes of continental shelf hypoxia that supports the 2001 "Action Plan for Reducing, Mitigating, and Controlling Hypoxiain the Northern Gulf of Mexico," incorporating data, publications, and res...
300 Area Building Retention Evaluation Mitigation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. J. McBride
2007-07-03
Evaluate the long-term retention of several facilities associated with the PNNL Capability Replacement Laboratory and other Hanfor mission needs. WCH prepared a mitigation plan for three scenarios with different release dates for specific buildings. The evaluations present a proposed plan for providing utility services to retained facilities in support of a long-term (+20 year) lifespan in addition to temporary services to buildings with specified delayed release dates.
Ziegler, Andreas
2016-09-01
The focus of nuclear emergency planning in Austria has been so far on mitigating effects of widespread contamination (e.g. after NPP accidents); however, these plans did not contain provisions on the medical management of an acute radiation syndrome. To close this gap, a 'Medical Radiation Emergency Plan' was created in 2009 and 2011. This paper describes the development of this plan (including the selection of consulted guidance) as well as its structure and main propositions and closes with an outlook on probable enhancements for the second edition. © The Author 2016. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.
2011-01-01
The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.
43 CFR 10005.12 - Policy regarding the scope of measures to be included in the plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the site of the impact typically involves restoration or replacement. Off-site mitigation might involve protection, restoration, or enhancement of a similar resource value at a different location... responsibilities, the Commission sees an obligation to give priority to protection and restoration activities that...
Nonmarket resource valuation in the postfire environment
David Calkin; Greg Jones; Kevin Hyde
2008-01-01
After the containment of large wildland fires, major onsite and downstream effects including lost soil productivity, watershed response, increased vulnerability to invasive weeds, and downstream sedimentation can cause threats to human life and property. Burned Area Emergency Response (BAER) teams are responsible for developing treatment plans to mitigate negative...
Magnetic Fields on the National Ignition Facility (MagNIF)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mason, D.; Folta, J.
2016-08-12
A magnetized target capability on the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) has been investigated. Stakeholders’ needs and project feasibility analysis were considered in order to down-select from a wide variety of different potential magnetic field magnitudes and volumes. From the large range of different target platforms, laser configurations, and diagnostics configurations of interest to the stakeholders, the gas-pipe platform has been selected for the first round of magnetized target experiments. Gas pipe targets are routinely shot on the NIF and provide unique value for external collaborators. High-level project goals have been established including an experimentallymore » relevant 20Tesla magnetic field magnitude. The field will be achieved using pulsed power-driven coils. A system architecture has been proposed. The pulsed power drive system will be located in the NIF target bay. This decision provides improved maintainability and mitigates equipment safety risks associated with explosive failure of the drive capacitor. High-level and first-level subsystem requirements have been established. Requirements have been included for two distinct coil designs – full solenoid and quasi-Helmholtz. A Failure Modes and Effects Analysis (FMEA) has been performed and documented. Additional requirements have been derived from the mitigations included in the FMEA document. A project plan is proposed. The plan includes a first phase of electromagnetic simulations to assess whether the design will meet performance requirements, then a second phase of risk mitigation projects to address the areas of highest technical risk. The duration from project kickoff to the first magnetized target shot is approximately 29 months.« less
Wildlife Habitat Impact Assessment, Chief Joseph Dam Project, Washington : Project Report 1992.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuehn, Douglas; Berger, Matthew
1992-01-01
Under the Pacific Northwest Electric Power Planning and Conservation Act of 1980, and the subsequent Northwest Power Planning Council`s Columbia River Basin Fish and Wildlife Program, a wildlife habitat impact assessment and identification of mitigation objectives have been developed for the US Army Corps of Engineer`s Chief Joseph Dam Project in north-central Washington. This study will form the basis for future mitigation planning and implementation.
NASA Astrophysics Data System (ADS)
Osland, Anna Christine
Hazardous liquid and natural gas transmission pipelines have received limited attention by planning scholars even though local development decisions can have broad consequences if a rupture occurs. In this dissertation, I evaluated the implications of land-use planning for reducing risk to transmission pipeline hazards in North Carolina via three investigations. First, using a survey of planning directors in jurisdictions with transmission pipeline hazards, I investigated the land use planning tools used to mitigate pipeline hazards and the factors associated with tool adoption. Planning scholars have documented the difficulty of inducing planning in hazardous areas, yet there remain gaps in knowledge about the factors associated with tool adoption. Despite the risks associated with pipeline ruptures, I found most localities use few mitigation tools, and the adoption of regulatory and informational tools appear to be influenced by divergent factors. Whereas risk perception, commitment, capacity, and community context were associated with total tool and information tool use, only risk perception and capacity factors were associated with regulatory tool use. Second, using interviews of emergency managers and planning directors, I examined the role of agency collaboration for building mitigation capacity. Scholars have highlighted the potential of technical collaboration, yet less research has investigated how inter-agency collaboration shapes mitigation capacity. I identify three categories of technical collaboration, discuss how collaborative spillovers can occur from one planning area to another, and challenge the notion that all technical collaborations result in equal mitigation outcomes. Third, I evaluated characteristics of the population near pipelines to address equity concerns. Surprisingly, I did not find broad support for differences in exposure of vulnerable populations. Nonetheless, my analyses uncovered statistically significant clusters of vulnerable groups within the hazard area. Interestingly, development closer to pipelines was newer than areas farther away, illustrating the failure of land-use planning to reduce development encroachment. Collectively, these results highlight the potential of land-use planning to keep people and development from encroaching on pipeline hazards. While this study indicates that planners in many areas address pipeline hazards, it also illustrates how changes to local practices can further reduce risks to human health, homeland security, and the environment.
40 CFR 51.860 - Mitigation of air quality impacts.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Mitigation of air quality impacts. 51... Federal Actions to State or Federal Implementation Plans § 51.860 Mitigation of air quality impacts. Link... mitigate air quality impacts must be identified and the process for implementation and enforcement of such...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashley, Paul
1992-06-01
The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.
Examination of Icing Induced Loss of Control and Its Mitigations
NASA Technical Reports Server (NTRS)
Reehorst, Andrew L.; Addy, Harold E., Jr.; Colantonio, Renato O.
2010-01-01
Factors external to the aircraft are often a significant causal factor in loss of control (LOC) accidents. In today s aviation world, very few accidents stem from a single cause and typically have a number of causal factors that culminate in a LOC accident. Very often the "trigger" that initiates an accident sequence is an external environment factor. In a recent NASA statistical analysis of LOC accidents, aircraft icing was shown to be the most common external environmental LOC causal factor for scheduled operations. When investigating LOC accident or incidents aircraft icing causal factors can be categorized into groups of 1) in-flight encounter with super-cooled liquid water clouds, 2) take-off with ice contamination, or 3) in-flight encounter with high concentrations of ice crystals. As with other flight hazards, icing induced LOC accidents can be prevented through avoidance, detection, and recovery mitigations. For icing hazards, avoidance can take the form of avoiding flight into icing conditions or avoiding the hazard of icing by making the aircraft tolerant to icing conditions. Icing detection mitigations can take the form of detecting icing conditions or detecting early performance degradation caused by icing. Recovery from icing induced LOC requires flight crew or automated systems capable of accounting for reduced aircraft performance and degraded control authority during the recovery maneuvers. In this report we review the icing induced LOC accident mitigations defined in a recent LOC study and for each mitigation describe a research topic required to enable or strengthen the mitigation. Many of these research topics are already included in ongoing or planned NASA icing research activities or are being addressed by members of the icing research community. These research activities are described and the status of the ongoing or planned research to address the technology needs is discussed
NASA Astrophysics Data System (ADS)
Recatalá Boix, Luis; Zinck, Joseph Alfred
2008-08-01
The Burruyacú district (Tucumán province, Northwest Argentina) has been traditionally an area with rural activities based on the exploitation of the Chaco forest for timber and livestock browsing. Since the 1960s, local institutions started promoting soybean due to favorable land conditions and good market prices. Soybean extension, as from the 1970s, has resulted in important reduction of the Chaco forest and also caused physical soil degradation, especially soil compaction and erosion. A land-use-planning exercise was carried out using the Land-Use Planning and Information System (LUPIS) as a spatial decision support system. LUPIS facilitates the generation of alternative land-use plans by adjusting the relative importance attributed by multiple stakeholders to preference and avoidance policies. The system leads to the allocation of competing land uses to land map units in accordance with their preferred resource requirements, conditional upon the resource base of the area and the stakeholders’ demands. After generating a land use plan for each stakeholder category identified in the study area, including commercial farmers, conservative/conventional farmers, and conservationists, a consensus plan was established to address the land-use conflicts between mechanized agriculture, traditional agriculture and forest conservation, and to mitigate soil degradation caused by extensive dry-farming. Although the planning exercise did not directly involve the stakeholders, the results are sufficiently practical and realistic to suggest that the approach could be extended to the entire Chaco plain region.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fredenberg, Wade; Carty, Daniel; Cavigli, Jon
1996-06-01
The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flatheadmore » Lake.{close_quotes}« less
2011-01-01
Background Influenza viruses are a major cause of morbidity and mortality worldwide. Vaccination remains a powerful tool for preventing or mitigating influenza outbreaks. Yet, vaccine supplies and daily administration capacities are limited, even in developed countries. Understanding how such constraints can alter the mitigating effects of vaccination is a crucial part of influenza preparedness plans. Mathematical models provide tools for government and medical officials to assess the impact of different vaccination strategies and plan accordingly. However, many existing models of vaccination employ several questionable assumptions, including a rate of vaccination proportional to the population at each point in time. Methods We present a SIR-like model that explicitly takes into account vaccine supply and the number of vaccines administered per day and places data-informed limits on these parameters. We refer to this as the non-proportional model of vaccination and compare it to the proportional scheme typically found in the literature. Results The proportional and non-proportional models behave similarly for a few different vaccination scenarios. However, there are parameter regimes involving the vaccination campaign duration and daily supply limit for which the non-proportional model predicts smaller epidemics that peak later, but may last longer, than those of the proportional model. We also use the non-proportional model to predict the mitigating effects of variably timed vaccination campaigns for different levels of vaccination coverage, using specific constraints on daily administration capacity. Conclusions The non-proportional model of vaccination is a theoretical improvement that provides more accurate predictions of the mitigating effects of vaccination on influenza outbreaks than the proportional model. In addition, parameters such as vaccine supply and daily administration limit can be easily adjusted to simulate conditions in developed and developing nations with a wide variety of financial and medical resources. Finally, the model can be used by government and medical officials to create customized pandemic preparedness plans based on the supply and administration constraints of specific communities. PMID:21806800
NASA's Research in Aircraft Vulnerability Mitigation
NASA Technical Reports Server (NTRS)
Allen, Cheryl L.
2005-01-01
Since its inception in 1958, the National Aeronautics and Space Administration s (NASA) role in civil aeronautics has been to develop high-risk, high-payoff technologies to meet critical national aviation challenges. Following the events of Sept. 11, 2001, NASA recognized that it now shared the responsibility for improving homeland security. The NASA Strategic Plan was modified to include requirements to enable a more secure air transportation system by investing in technologies and collaborating with other agencies, industry, and academia. NASA is conducting research to develop and advance innovative and commercially viable technologies that will reduce the vulnerability of aircraft to threats or hostile actions, and identify and inform users of potential vulnerabilities in a timely manner. Presented in this paper are research plans and preliminary status for mitigating the effects of damage due to direct attacks on civil transport aircraft. The NASA approach to mitigation includes: preventing loss of an aircraft due to a hit from man-portable air defense systems; developing fuel system technologies that prevent or minimize in-flight vulnerability to small arms or other projectiles; providing protection from electromagnetic energy attacks by detecting directed energy threats to aircraft and on/off-board systems; and minimizing the damage due to high-energy attacks (explosions and fire) by developing advanced lightweight, damage-resistant composites and structural concepts. An approach to preventing aircraft from being used as weapons of mass destruction will also be discussed.
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL) programs... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Preparing for Euro 2012: developing a hazard risk assessment.
Wong, Evan G; Razek, Tarek; Luhovy, Artem; Mogilevkina, Irina; Prudnikov, Yuriy; Klimovitskiy, Fedor; Yutovets, Yuriy; Khwaja, Kosar A; Deckelbaum, Dan L
2015-04-01
Risk assessment is a vital step in the disaster-preparedness continuum as it is the foundation of subsequent phases, including mitigation, response, and recovery. To develop a risk assessment tool geared specifically towards the Union of European Football Associations (UEFA) Euro 2012. In partnership with the Donetsk National Medical University, Donetsk Research and Development Institute of Traumatology and Orthopedics, Donetsk Regional Public Health Administration, and the Ministry of Emergency of Ukraine, a table-based tool was created, which, based on historical evidence, identifies relevant potential threats, evaluates their impacts and likelihoods on graded scales based on previous available data, identifies potential mitigating shortcomings, and recommends further mitigation measures. This risk assessment tool has been applied in the vulnerability-assessment-phase of the UEFA Euro 2012. Twenty-three sub-types of potential hazards were identified and analyzed. Ten specific hazards were recognized as likely to very likely to occur, including natural disasters, bombing and blast events, road traffic collisions, and disorderly conduct. Preventative measures, such as increased stadium security and zero tolerance for impaired driving, were recommended. Mitigating factors were suggested, including clear, incident-specific preparedness plans and enhanced inter-agency communication. This hazard risk assessment tool is a simple aid in vulnerability assessment, essential for disaster preparedness and response, and may be applied broadly to future international events.
NASA Astrophysics Data System (ADS)
Bethel, M.; Braud, D.; Lambeth, T.; Biber, P.; Wu, W.
2017-12-01
Coastal community leaders, government officials, and natural resource managers must be able to accurately assess and predict a given coastal landscape's sustainability and/or vulnerability as coastal habitat continues to undergo rapid and dramatic changes associated with natural and anthropogenic activities such as accelerated relative sea level rise (SLR). To help address this information need, a multi-disciplinary project team conducted Sea Grant sponsored research in Louisiana and Mississippi with traditional ecosystem users and natural resource managers to determine a method for producing localized vulnerability and sustainability maps for projected SLR and storm surge impacts, and determine how and whether the results of such an approach can provide more useful information to enhance hazard mitigation planning. The goals of the project are to develop and refine SLR visualization tools for local implementation in areas experiencing subsidence and erosion, and discover the different ways stakeholder groups evaluate risk and plan mitigation strategies associated with projected SLR and storm surge. Results from physical information derived from data and modeling of subsidence, erosion, engineered restoration and coastal protection features, historical land loss, and future land projections under SLR are integrated with complimentary traditional ecological knowledge (TEK) offered by the collaborating local ecosystem users for these assessments. The data analysis involves interviewing stakeholders, coding the interviews for themes, and then converting the themes into vulnerability and sustainability factors. Each factor is weighted according to emphasis by the TEK experts and number of experts who mention it to determine which factors are the highest priority. The priority factors are then mapped with emphasis on the perception of contributing to local community vulnerability or sustainability to SLR and storm surge. The maps are used by the collaborators to benefit local hazard mitigation and adaptation planning. The results to date in achieving the project objectives will be presented that include: analyses of scientific field data collected related to marsh vegetation biomass characteristics, analyses of TEK data collected, and mapping products developed.
Improved satellite-based emergency alerting system
NASA Astrophysics Data System (ADS)
Bernard, E. N.; Milburn, H. B.
1991-12-01
Rapid-onset natural hazards have claimed more than 2.8 million lives worldwide in the past 20 years. This category includes such events as earthquakes, landslides, hurricanes, tornadoes, floods, volcanic eruptions, wildfires, and tsunamis. Effective hazard mitigation is particularly difficult in such cases, since the time available to issue warnings can be very short or even nonexistent. A general approach to mitigate the effects of these disasters was demonstrated in 1988 that included preevent emergency planning, real-time hazard assessment, and rapid warning via satellite communication links. This article reports on improvements in this satellite-based emergency alerting communication system that have reduced the response time from 87 to 17 sec and expanded the broadcast coverage from 40 percent to 62 percent of the earth's surface.
NASA Astrophysics Data System (ADS)
Bernard, E. N.; Behn, R. R.; Hebenstreit, G. T.; Gonzalez, F. I.; Krumpe, P.; Lander, J. F.; Lorca, E.; McManamon, P. M.; Milburn, H. B.
Rapid onset natural hazards have claimed more than 2.8 million lives worldwide in the past 20 years. This category includes such events as earthquakes, landslides, hurricanes, tornados, floods, volcanic eruptions, wildfires, and tsunamis. Effective hazard mitigation is particularly difficult in such cases, since the time available to issue warnings can be very short or even nonexistent. This paper presents the concept of a local warning system that exploits and integrates the existing technologies of risk evaluation, environmental measurement, and telecommunications. We describe Project THRUST, a successful implementation of this general, systematic approach to tsunamis. The general approach includes pre-event emergency planning, real-time hazard assessment, and rapid warning via satellite communication links.
West Valley demonstration project: Implementation of the kerosene mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blickwedehl, R.R.; Goodman, J.; Valenti, P.J.
1987-05-01
An aggressive program was implemented to mitigate the migration of radioactive kerosene believed to have originated from the West Valley NRC-Licensed Disposal Area (NDA) disposal trenches designated as SH-10 and SH-11 (Special Holes 10 and 11). This report provides a historical background of the events leading to the migration problem, the results of a detailed investigation to determine the location and source of the kerosene migration, the remediation plan to mitigate the migration, and the actions taken to successfully stabilize the kerosene. 7 refs., 19 figs., 1 tab.
Risk Management for Human Support Technology Development
NASA Technical Reports Server (NTRS)
jones, Harry
2005-01-01
NASA requires continuous risk management for all programs and projects. The risk management process identifies risks, analyzes their impact, prioritizes them, develops and carries out plans to mitigate or accept them, tracks risks and mitigation plans, and communicates and documents risk information. Project risk management is driven by the project goal and is performed by the entire team. Risk management begins early in the formulation phase with initial risk identification and development of a risk management plan and continues throughout the project life cycle. This paper describes the risk management approach that is suggested for use in NASA's Human Support Technology Development. The first step in risk management is to identify the detailed technical and programmatic risks specific to a project. Each individual risk should be described in detail. The identified risks are summarized in a complete risk list. Risk analysis provides estimates of the likelihood and the qualitative impact of a risk. The likelihood and impact of the risk are used to define its priority location in the risk matrix. The approaches for responding to risk are either to mitigate it by eliminating or reducing the effect or likelihood of a risk, to accept it with a documented rationale and contingency plan, or to research or monitor the risk, The Human Support Technology Development program includes many projects with independently achievable goals. Each project must do independent risk management, considering all its risks together and trading them against performance, budget, and schedule. Since the program can succeed even if some projects fail, the program risk has a complex dependence on the individual project risks.
Evaluating fuel complexes for fire hazard mitigation planning in the southeastern United States
Anne G. Andreu; Dan Shea; Bernard R. Parresol; Roger D. Ottmar
2012-01-01
Fire hazard mitigation planning requires an accurate accounting of fuel complexes to predict potential fire behavior and effects of treatment alternatives. In the southeastern United States, rapid vegetation growth coupled with complex land use history and forest management options requires a dynamic approach to fuel characterization. In this study we assessed...
DOT National Transportation Integrated Search
2014-11-01
The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives and to identify mitigation strategies and priorities that provide greater cost-benefit potential and implement...
DOT National Transportation Integrated Search
2014-04-01
The objective of this research project is to assess current mitigation policies and practices in comparison to : resource agency objectives, and identify mitigation strategies and priorities that provide greater cost-benefit : potential and implement...
Wetlands Mitigation Banking Concepts
1992-07-01
Naval Amphibious Bas Eslgrss Mit. Bank CA, San Diego Co. dredging & facilities Dept of the Navy SeaWorld Eelgras Mitigation Dank CA, San Diego Co...shore development, private projects SeaWorld 8 Table 2. WETLAND MITIGATION BANKS UNDER PLANNING, Institute for Water Resources Preliminary Survey Data
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.2... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
44 CFR 201.3 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... receive the reduced cost share for the Flood Mitigation Assistance (FMA) and Severe Repetitive Loss (SRL... HOMELAND SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.3 Responsibilities. (a) General. This... Administrator are to: (1) Oversee all FEMA related pre- and post-disaster hazard mitigation programs and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78... organization, that has zoning and building code jurisdiction over a particular area having special flood..., that is designated to develop and administer a mitigation plan by political subdivisions, all of which...
NASA Astrophysics Data System (ADS)
Hummel, M.; Wood, N. J.; Stacey, M. T.; Schweikert, A.; Barnard, P.; Erikson, L. H.
2016-12-01
The threat of tidal flooding in coastal regions is exacerbated by sea level rise (SLR), which can lead to more frequent and persistent nuisance flooding and permanent inundation of low-lying areas. When coupled with extreme storm events, SLR also increases the extent and depth of flooding due to storm surges. To mitigate these impacts, bayfront communities are considering a variety of options for shoreline protection, including restoration of natural features such as wetlands and hardening of the shoreline using levees and sea walls. These shoreline modifications can produce changes in the tidal dynamics in a basin, either by increasing dissipation of tidal energy or enhancing tidal amplification [1]. As a result, actions taken by individual communities not only impact local inundation, but can also have implications for flooding on a regional scale. However, regional collaboration is lacking in flood mitigation planning, which is often done on a community-by-community basis. This can lead to redundancy in planning efforts and can also have adverse effects on communities that are not included in discussions about shoreline infrastructure improvements. Using flooding extent outputs from a hydrodynamic model of San Francisco Bay, we performed a K-means clustering analysis to identify similarities between 65 bayfront communities in terms of the spatial, demographic, and economic characteristics of their vulnerable assets for a suite of SLR and storm scenarios. Our clustering analysis identifies communities with similar vulnerabilities and allows for more effective collaboration and decision-making at a regional level by encouraging comparable communities to work together and pool resources to find effective adaptation strategies as flooding becomes more frequent and severe. [1] Holleman RC, Stacey MT (2014) Coupling of sea level rise, tidal amplification, and inundation. Journal of Physical Oceanography 44:1439-1455.
Bangladesh arsenic mitigation programs: lessons from the past
Milton, Abul Hasnat; Hore, Samar Kumar; Hossain, Mohammad Zahid; Rahman, Mahfuzar
2012-01-01
Ensuring access to safe drinking water by 2015 is a global commitment by the Millennium Development Goals (MDGs). In Bangladesh, significant achievements in providing safe water were made earlier by nationwide tubewell-installation programme. This achievement was overshadowed in 1993 by the presence of arsenic in underground water. A total of 6 million tubewells have been tested for arsenic since then, the results of which warranted immediate mitigation. Mitigation measures included tubewell testing and replacing; usage of deeper wells; surface water preservation and treatment; use of sanitary dug wells, river sand and pond sand filters; rainwater collection and storage; household-scale and large-scale arsenic filtrations; and rural pipeline water supply installation. Shallow tubewell installation was discouraged. Efforts have been made to increase people's awareness. This paper describes the lessons learned about mitigation efforts by the authors from experience of arsenic-related work. In spite of national mitigation plans and efforts, a few challenges still persist: inadequate coordination between stakeholders, differences in inter-sectoral attitudes, inadequate research to identify region-specific, suitable safe water options, poor quality of works by various implementing agencies, and inadequate dissemination of the knowledge and experiences to the people by those organizations. Issues such as long-time adaptation using ground water, poor surface water quality including bad smell and turbidity, and refusal to using neighbor's water have delayed mitigation measures so far. Region-specific mitigation water supply policy led by the health sector could be adopted with multisectoral involvement and responsibility. Large-scale piped water supply could be arranged through Public Private Partnerships (PPP) in new national approach. PMID:22558005
Bangladesh arsenic mitigation programs: lessons from the past.
Milton, Abul Hasnat; Hore, Samar Kumar; Hossain, Mohammad Zahid; Rahman, Mahfuzar
2012-01-01
Ensuring access to safe drinking water by 2015 is a global commitment by the Millennium Development Goals (MDGs). In Bangladesh, significant achievements in providing safe water were made earlier by nationwide tubewell-installation programme. This achievement was overshadowed in 1993 by the presence of arsenic in underground water. A total of 6 million tubewells have been tested for arsenic since then, the results of which warranted immediate mitigation. Mitigation measures included tubewell testing and replacing; usage of deeper wells; surface water preservation and treatment; use of sanitary dug wells, river sand and pond sand filters; rainwater collection and storage; household-scale and large-scale arsenic filtrations; and rural pipeline water supply installation. Shallow tubewell installation was discouraged. Efforts have been made to increase people's awareness. This paper describes the lessons learned about mitigation efforts by the authors from experience of arsenic-related work. In spite of national mitigation plans and efforts, a few challenges still persist: inadequate coordination between stakeholders, differences in inter-sectoral attitudes, inadequate research to identify region-specific, suitable safe water options, poor quality of works by various implementing agencies, and inadequate dissemination of the knowledge and experiences to the people by those organizations. Issues such as long-time adaptation using ground water, poor surface water quality including bad smell and turbidity, and refusal to using neighbor's water have delayed mitigation measures so far. Region-specific mitigation water supply policy led by the health sector could be adopted with multisectoral involvement and responsibility. Large-scale piped water supply could be arranged through Public Private Partnerships (PPP) in new national approach.
77 FR 32481 - Approval and Promulgation of State Implementation Plans: Oregon
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-01
... consultation, and enforceability of certain transportation related control and mitigation measures. DATES... the body of your comment. If you send an email comment directly to the EPA without going through www... comment, the EPA recommends that you include your name and other contact information in the body of your...
Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California
NASA Astrophysics Data System (ADS)
Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.
2016-12-01
In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1992-08-01
The US Department of Energy (DOE) proposes to conduct a program to characterize groundwater at the Nevada Test Site (NTS), Nye County, Nevada, in accordance with a 1987 DOE memorandum stating that all past, present, and future nuclear test sites would be treated as Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites (Memorandum from Bruce Green, Weapons Design and Testing Division, June 6, 1987). DOE has prepared an environmental assessment (DOE/EA-0532) to evaluate the environmental consequences associated with the proposed action, referred to as the Groundwater Characterization Project (GCP). This proposed action includes constructing access roads and drill pads,more » drilling and testing wells, and monitoring these wells for the purpose of characterizing groundwater at the NTS. Long-term monitoring and possible use of these wells in support of CERCLA, as amended by the Superfund Amendments and Reauthorization Act, is also proposed. The GCP includes measures to mitigate potential impacts on sensitive biological, cultural and historical resources, and to protect workers and the environment from exposure to any radioactive or mixed waste materials that may be encountered. DOE considers those mitigation measures related to sensitive biological, cultural and historic resources as essential to render the impacts of the proposed action not significant, and DOE has prepared a Mitigation Action Plan (MAP) that explains how such mitigations will be planned and implemented. Based on the analyses presented in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, preparation of an environmental impact statement is not required and the Department is issuing this FONSI.« less
Wu, Jasmanda; Juhaeri, Juhaeri
2016-12-01
The US Food and Drug Administration (FDA) Amendments Act of 2007 granted the FDA new authorities to enhance drug safety by requiring application holders to submit a proposed Risk Evaluation and Mitigation Strategy (REMS). A REMS is a required risk management plan that uses tools beyond the package insert. REMS elements may include a medication guide and patient package insert for patients and a communication plan focused on health care professionals. Elements to assure safe use (ETASUs) are put in place to mitigate a specific known serious risk when other less restrictive elements of a REMS are not sufficient to mitigate such risk. An implementation system is required for an REMS that includes the ETASUs. With approximately eight years of experience with REMS programs, many health care settings have created systems to manage REMS and also to integrate REMS into their practice settings. At the same time, there are issues associated with the development and implementation of REMS. In 2011, FDA created the REMS Integration Initiative to develop guidance on how to apply statutory criteria to determine when a REMS is required, to improve standardization and assessment of REMS, and to improve integration of REMS into the existing healthcare system. A key component of the REMS Integration Initiative is stakeholder outreach to better understand how existing REMS programs are working and to identify opportunities for improvement. This review attempts to share our company's experience with the REMS program, and to provide updates on FDA's efforts to improve REMS communication, to standardize REMS process, to reduce REMS program burdens and to build a common REMS platform. Copyright © 2016 Elsevier HS Journals, Inc. All rights reserved.
Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements
NASA Technical Reports Server (NTRS)
McKinley, David
2008-01-01
The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.
Cascadia Earthquake and Tsunami Scenario for California's North Coast
NASA Astrophysics Data System (ADS)
Dengler, L.
2006-12-01
In 1995 the California Division of Mines and Geology (now the California Geological Survey) released a planning scenario for an earthquake on the southern portion of the Cascadia subduction zone (CSZ). This scenario was the 8th and last of the Earthquake Planning Scenarios published by CDMG. It was the largest magnitude CDMG scenario, an 8.4 earthquake rupturing the southern 200 km of the CSZ, and it was the only scenario to include tsunami impacts. This scenario event has not occurred in historic times and depicts impacts far more severe than any recent earthquake. The local tsunami hazard is new; there is no written record of significant local tsunami impact in the region. The north coast scenario received considerable attention in Humboldt and Del Norte Counties and contributed to a number of mitigation efforts. The Redwood Coast Tsunami Work Group (RCTWG), an organization of scientists, emergency managers, government agencies, and businesses from Humboldt, Mendocino, and Del Norte Counties, was formed in 1996 to assist local jurisdictions in understanding the implications of the scenario and to promote a coordinated, consistent mitigation program. The group has produced print and video materials and promoted response and evacuation planning. Since 1997 the RCTWG has sponsored an Earthquake Tsunami Education Room at county fairs featuring preparedness information, hands-on exhibits and regional tsunami hazard maps. Since the development of the TsunamiReady Program in 2001, the RCTWG facilitates community TsunamiReady certification. To assess the effectiveness of mitigation efforts, five telephone surveys between 1993 and 2001 were conducted by the Humboldt Earthquake Education Center. A sixth survey is planned for this fall. Each survey includes between 400 and 600 respondents. Over the nine year period covered by the surveys, the percent with houses secured to foundations has increased from 58 to 80 percent, respondents aware of a local tsunami hazard increased from 51 to 73 percent and knowing what the Cascadia subduction zone is from 16 to 42 percent. It is not surprising that the earlier surveys showed increases as several strong earthquakes occurred in the area between 1992 and 1995 and there was considerable media attention. But the 2001 survey, seven years after the last widely felt event, still shows significant increases in almost all preparedness indicators. The 1995 CDMG scenario was not the sole reason for the increased interest in earthquake and tsunami hazards in the area, but the scenario gave government recognition to an event that was previously only considered seriously in the scientific community and has acted as a catalyst for mitigation and planning efforts.
NASA Technical Reports Server (NTRS)
Best, R. G.; Moore, D. G.; Myers, V. I.
1977-01-01
An inventory of wetlands for the area included in the proposed Oahe irrigation project was conducted to provide supplemental data for the wildlife mitigation plan. Interpretation techniques for inventoring small wetlands in the low relief terrain of the Lake Dakota Plain were documented and data summaries included. The data were stored and tabulated in a computerized spatial data analysis system.
NASA Astrophysics Data System (ADS)
Thorne, James H.; Girvetz, Evan H.; McCoy, Michael C.
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
Thorne, James H; Girvetz, Evan H; McCoy, Michael C
2009-05-01
This study presents a GIS-based database framework used to assess aggregate terrestrial habitat impacts from multiple highway construction projects in California, USA. Transportation planners need such impact assessment tools to effectively address additive biological mitigation obligations. Such assessments can reduce costly delays due to protracted environmental review. This project incorporated the best available statewide natural resource data into early project planning and preliminary environmental assessments for single and multiple highway construction projects, and provides an assessment of the 10-year state-wide mitigation obligations for the California Department of Transportation. Incorporation of these assessments will facilitate early and more strategic identification of mitigation opportunities, for single-project and regional mitigation efforts. The data architecture format uses eight spatial scales: six nested watersheds, counties, and transportation planning districts, which were intersected. This resulted in 8058 map planning units statewide, which were used to summarize all subsequent analyses. Range maps and georeferenced locations of federally and state-listed plants and animals and a 55-class landcover map were spatially intersected with the planning units and the buffered spatial footprint of 967 funded projects. Projected impacts were summarized and output to the database. Queries written in the database can sum expected impacts and provide summaries by individual construction project, or by watershed, county, transportation district or highway. The data architecture allows easy incorporation of new information and results in a tool usable without GIS by a wide variety of agency biologists and planners. The data architecture format would be useful for other types of regional planning.
Earthquake Hazard Mitigation Using a Systems Analysis Approach to Risk Assessment
NASA Astrophysics Data System (ADS)
Legg, M.; Eguchi, R. T.
2015-12-01
The earthquake hazard mitigation goal is to reduce losses due to severe natural events. The first step is to conduct a Seismic Risk Assessment consisting of 1) hazard estimation, 2) vulnerability analysis, 3) exposure compilation. Seismic hazards include ground deformation, shaking, and inundation. The hazard estimation may be probabilistic or deterministic. Probabilistic Seismic Hazard Assessment (PSHA) is generally applied to site-specific Risk assessments, but may involve large areas as in a National Seismic Hazard Mapping program. Deterministic hazard assessments are needed for geographically distributed exposure such as lifelines (infrastructure), but may be important for large communities. Vulnerability evaluation includes quantification of fragility for construction or components including personnel. Exposure represents the existing or planned construction, facilities, infrastructure, and population in the affected area. Risk (expected loss) is the product of the quantified hazard, vulnerability (damage algorithm), and exposure which may be used to prepare emergency response plans, retrofit existing construction, or use community planning to avoid hazards. The risk estimate provides data needed to acquire earthquake insurance to assist with effective recovery following a severe event. Earthquake Scenarios used in Deterministic Risk Assessments provide detailed information on where hazards may be most severe, what system components are most susceptible to failure, and to evaluate the combined effects of a severe earthquake to the whole system or community. Casualties (injuries and death) have been the primary factor in defining building codes for seismic-resistant construction. Economic losses may be equally significant factors that can influence proactive hazard mitigation. Large urban earthquakes may produce catastrophic losses due to a cascading of effects often missed in PSHA. Economic collapse may ensue if damaged workplaces, disruption of utilities, and resultant loss of income produces widespread default on payments. With increased computational power and more complete inventories of exposure, Monte Carlo methods may provide more accurate estimation of severe losses and the opportunity to increase resilience of vulnerable systems and communities.
Developing Legacy: Health Planning in the Host City of Porto Alegre for the 2014 Football World Cup.
Witt, Regina Rigatto; Kotlhar, Mauro Kruter; Mesquita, Marilise Oliveira; Lima, Maria Alice Dias da Silva; Marin, Sandra Mara; Day, Carolina Baltar; Bandeira, Andrea Goncalves; Hutton, Alison
2015-12-01
To describe the process adopted to identify, classify, and evaluate legacy of health care planning in the host city of Porto Alegre for the Football World Cup 2014. There is an emerging interest in the need to demonstrate a sustainable health legacy from mass gatherings investments. Leaving a public health legacy for future host cities and countries is now an important part of planning for these events. The Ministry of Sports initiated and coordinated the development of projects in the host cities to identify actions, projects, and constructions to be developed to prepare for the World Cup. In Porto Alegre, a common structure was developed by the coordinating team to instruct legacy identification, classification, and evaluation. This structure was based on international documentary analysis (including official reports, policy documents, and web-based resources) and direct communication with recognized experts in the field. Sixteen total legacies were identified for health surveillance (5) and health services (11). They were classified according to the strategic area, organizations involved, dimension, typology, planned or unplanned, tangible or intangible, territorial coverage, and situation prior to the World Cup. Possible impacts were then assessed as positive, negative, and potentiating, and mitigating actions were indicated. The project allowed the identification, classification, and development of health legacy, including risk analysis, surveillance, mitigation measures, and provision of emergency medical care. Although the project intended the development of indicators to measure the identified legacies, evaluation was not possible at the time of publication due to time.
A multi-model assessment of the co-benefits of climate mitigation for global air quality
NASA Astrophysics Data System (ADS)
Rao, Shilpa; Klimont, Zbigniew; Leitao, Joana; Riahi, Keywan; van Dingenen, Rita; Aleluia Reis, Lara; Calvin, Katherine; Dentener, Frank; Drouet, Laurent; Fujimori, Shinichiro; Harmsen, Mathijs; Luderer, Gunnar; Heyes, Chris; Strefler, Jessica; Tavoni, Massimo; van Vuuren, Detlef P.
2016-12-01
We present a model comparison study that combines multiple integrated assessment models with a reduced-form global air quality model to assess the potential co-benefits of global climate mitigation policies in relation to the World Health Organization (WHO) goals on air quality and health. We include in our assessment, a range of alternative assumptions on the implementation of current and planned pollution control policies. The resulting air pollution emission ranges significantly extend those in the Representative Concentration Pathways. Climate mitigation policies complement current efforts on air pollution control through technology and fuel transformations in the energy system. A combination of stringent policies on air pollution control and climate change mitigation results in 40% of the global population exposed to PM levels below the WHO air quality guideline; with the largest improvements estimated for India, China, and Middle East. Our results stress the importance of integrated multisector policy approaches to achieve the Sustainable Development Goals.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-18
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OPP-2010-0229; FRL-8816-8] Pet Spot-On Analysis and... registered pet spot-on products to control fleas and ticks and a mitigation plan. The analysis consists of a Technical Review Document and Data Evaluation Records for pet spot-on products. The Agency is requesting...
CO2 Mitigation Measures of Power Sector and Its Integrated Optimization in China
Dai, Pan; Chen, Guang; Zhou, Hao; Su, Meirong; Bao, Haixia
2012-01-01
Power sector is responsible for about 40% of the total CO2 emissions in the world and plays a leading role in climate change mitigation. In this study, measures that lower CO2 emissions from the supply side, demand side, and power grid are discussed, based on which, an integrated optimization model of CO2 mitigation (IOCM) is proposed. Virtual energy, referring to energy saving capacity in both demand side and the power grid, together with conventional energy in supply side, is unified planning for IOCM. Consequently, the optimal plan of energy distribution, considering both economic benefits and mitigation benefits, is figured out through the application of IOCM. The results indicate that development of demand side management (DSM) and smart grid can make great contributions to CO2 mitigation of power sector in China by reducing the CO2 emissions by 10.02% and 12.59%, respectively, in 2015, and in 2020. PMID:23213305
Anticipation and response: pandemic influenza in Malawi, 2009
Sambala, Evanson Z.; Manderson, Lenore
2017-01-01
ABSTRACT Background: In 2006, Malawi developed a national influenza plan to mitigate, prevent and manage the burden of infection should an outbreak occur. In 2009, it translated its contingency plan to respond to the unfolding influenza pandemic. However, little is known of how Malawi translated its national influenza plan into response actions, or the success of these responses. Objective: To investigate how Malawi translated its preparedness plan and so broaden our understanding of the outcomes of the responses. Methods: We draw on data from 22 in-depth interviews with government policymakers and people working at a policy level in various non-governmental organisations, conducted to assess the level of preparedness and the challenges of translating this. Results: Through a number of public health initiatives, authorities developed communication strategies, strengthened influenza surveillance activities and updated overall goals in pandemic training and education. However, without influenza drills, exercises and simulations to test the plan, activating the pandemic plan, including coordinating and deploying generic infection control measures, was problematic. Responses during the pandemic were at times ‘weak and clumsy’ and failed to mirror the activities and processes highlighted in the preparedness plan. Conclusions: Participants stressed that in order to achieve a coordinated and successful response to mitigate and prevent the further transmission of pandemic influenza, good preparation was critical. The key elements which they identified as relevant for a rapid response included effective communications, robust evidence-based decision-making, strong and reliable surveillance systems and flexible public health responses. To effectively articulate a viable trajectory of pandemic responses, the potential value of simulation exercises could be given more consideration as a mean of sustaining good levels of preparedness and responses against future pandemics. These all demand a well-structured planning for and response to pandemic influenza strategy developed by a functioning scientific and policy advisory committee. PMID:28753109
1983-01-01
7 A-A147 693 HARRY S TRUMAN D’AM AND RESERVOIR MISSOURI MITIGATION OF 1/ THE ADVERSE EFFEC. .0) ILLINOIS STATE MUSEUM SOCIETY SPRINGFIELD d d...BUREAU OF STANDARDS-.1963-A 1 2 qZTM II 0A MITIGATION OF THE ADVERSE EFFECTS UPON THE LOCAL PALEONTOLOGICAL RESOURCES OF THE HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER BASIN, MISSOURI FINAL REPORT OF FINDINGS VOLUME II: PLAN MAPS OF EXCAVATIONS by Jeffrey J. Saunders, Ph.D. Illinois State Museum
Community Mitigation Guidelines to Prevent Pandemic Influenza — United States, 2017
Levitt, Alexandra; Kanade, Neha; Wright-Jegede, Narue; Dopson, Stephanie; Biggerstaff, Matthew; Reed, Carrie; Uzicanin, Amra; Levitt, Alexandra; Dopson, Stephanie; Frank, Mark; Holloway, Rachel; Koonin, Lisa; Rasmussen, Sonja; Redd, Stephen; de la Motte Hurst, Christopher; Kanade, Neha; Rainey, Jeanette; Uzicanin, Amra; Biggerstaff, Matthew; Jernigan, Daniel; Reed, Carrie
2017-01-01
Summary When a novel influenza A virus with pandemic potential emerges, nonpharmaceutical interventions (NPIs) often are the most readily available interventions to help slow transmission of the virus in communities, which is especially important before a pandemic vaccine becomes widely available. NPIs, also known as community mitigation measures, are actions that persons and communities can take to help slow the spread of respiratory virus infections, including seasonal and pandemic influenza viruses. These guidelines replace the 2007 Interim Pre-pandemic Planning Guidance: Community Strategy for Pandemic Influenza Mitigation in the United States — Early, Targeted, Layered Use of Nonpharmaceutical Interventions (https://stacks.cdc.gov/view/cdc/11425). Several elements remain unchanged from the 2007 guidance, which described recommended NPIs and the supporting rationale and key concepts for the use of these interventions during influenza pandemics. NPIs can be phased in, or layered, on the basis of pandemic severity and local transmission patterns over time. Categories of NPIs include personal protective measures for everyday use (e.g., voluntary home isolation of ill persons, respiratory etiquette, and hand hygiene); personal protective measures reserved for influenza pandemics (e.g., voluntary home quarantine of exposed household members and use of face masks in community settings when ill); community measures aimed at increasing social distancing (e.g., school closures and dismissals, social distancing in workplaces, and postponing or cancelling mass gatherings); and environmental measures (e.g., routine cleaning of frequently touched surfaces). Several new elements have been incorporated into the 2017 guidelines. First, to support updated recommendations on the use of NPIs, the latest scientific evidence available since the influenza A (H1N1)pdm09 pandemic has been added. Second, a summary of lessons learned from the 2009 H1N1 pandemic response is presented to underscore the importance of broad and flexible prepandemic planning. Third, a new section on community engagement has been included to highlight that the timely and effective use of NPIs depends on community acceptance and active participation. Fourth, to provide new or updated pandemic assessment and planning tools, the novel influenza virus pandemic intervals tool, the Influenza Risk Assessment Tool, the Pandemic Severity Assessment Framework, and a set of prepandemic planning scenarios are described. Finally, to facilitate implementation of the updated guidelines and to assist states and localities with prepandemic planning and decision-making, this report links to six supplemental prepandemic NPI planning guides for different community settings that are available online (https://www.cdc.gov/nonpharmaceutical-interventions). PMID:28426646
Albeni Falls Wildlife Protection, Mitigation, and Enhancement Plan, Final Report 1987.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Martin, Robert C.
1988-08-01
A wildlife impact assessment and mitigation plan has been developed for the US Army Corps of Engineers Albeni Falls Project in northern Idaho. The Habitat Evaluation Procedure (HEP) was used to evaluate pre- and post-construction habitat conditions at the Albeni Falls Project. There were 6617 acres of wetlands converted to open water due to development and operation of the project. Eight evaluation species were selected with impacts expressed in numbers of Habitat Units (HU's). For a given species, one HU is equivalent to one acre of prime habitat. The Albeni Falls Project resulted in estimated losses of 5985 mallard HU's,more » 4699 Canada goose HU's, 3379 redhead HU's, 4508 breeding bald eagle HU's, 4365 wintering bald eagle HU's, 2286 black-capped chickadee HU's, 1680 white-tailed deer HU's, and 1756 muskrat HU's. The yellow warbler gained 71 HU's. Therefore, total target species estimated impacts were 28,587 HU's. Impacts on peregrine falcons were not quantified in terms of HU's. Projects have been proposed by an interagency team of biologists to mitigate the impacts of Albeni Falls on wildlife. The HEP was used to estimate benefits of proposed mitigation projects to target species. Through a series of proposed protection and enhancement actions, the mitigation plan will provide benefits of an estimated 28,590 target species HU's to mitigate Albeni Falls wildlife habitat values lost. 52 refs., 9 figs., 14 tabs.« less
ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis
2001-07-25
This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less
An Assessment of Institutional Capacity for Integrated Landscape Management in Eastern Cameroon.
Brown, H Carolyn Peach
2018-07-01
Landscape approaches have become prominent in efforts to address issues of conservation and development through bringing together different actors and sectors, to reconcile diverse land uses, and promote synergies. Some have suggested that integrated landscape management approaches are consistent with the goals of REDD+ and offer a strategy to address multiple goals of climate change mitigation, biodiversity conservation, maintenance of ecosystem services, and socio-economic development. Institutional or governance arrangements have been shown to be a critical component in influencing outcomes in landscapes. Using diverse methodologies, this study investigated the capacity of institutions to support the planning, implementation, and resource mobilization needed to integrate climate change mitigation, conservation, and livelihood goals in a forest mosaic landscape in East Cameroon. Results showed that diverse institutions are present in the landscape, including institutions of relevant government agencies, local government, local non-government, the private sector, and hybrid institutions of conservation, development and research institutions. However, the overall institutional capacity for integrated landscape planning and management in the study area is limited, although some institutions exhibit increased capacity in some areas over others. Multiple strategies can be employed to build the necessary human, financial, and leadership capacity, and facilitate the institutional planning and coordination that is foundational to multi-stakeholder landscape governance. Given the complexity of integrating climate change mitigation, conservation and livelihood goals in a landscape, building such institutional capacity is a long term endeavour that requires sustained effort and ongoing financial, technical and human resource support.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... Plan for the American Burying Beetle for Pipelines and Well Field Development in Oklahoma and Texas..., operation, and repair of oil and gas pipelines, and related well field activities. Individual oil and gas... pipelines and related well field activities, and will include measures necessary to minimize and mitigate...
Overview of NASA's Thermal Control System Development for Exploration Project
NASA Technical Reports Server (NTRS)
Stephan, Ryan A.
2011-01-01
The now-cancelled Constellation Program included the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, were planned to be manned space vehicles while the third element was much more diverse and included several sub-elements. Among other things, these sub-elements were Rovers and a Lunar Habitat. The planned missions involving these systems and vehicles included several risks and design challenges. Due to the unique thermal operating environment, many of these risks and challenges were associated with the vehicles thermal control system. NASA s Exploration Technology Development Program (ETDP) consisted of various technology development projects. The project chartered with mitigating the aforementioned thermal risks and design challenges was the Thermal Control System Development for Exploration Project. These risks and design challenges were being addressed through a rigorous technology development process that was planned to culminate with an integrated thermal control system test. Although the technologies being developed were originally aimed towards mitigating specific Constellation risks, the technology development process is being continued within a new program. This continued effort is justified by the fact that many of the technologies are generically applicable to future spacecraft thermal control systems. The current paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing a material compatibility assessment for a promising thermal control system working fluid. The to-date progress and lessons-learned from these development efforts will be discussed throughout the paper.
Director, Operational Test and Evaluation FY 2014 Annual Report
2015-01-01
Federal Departments and Agencies. Mitigation measures such as curtailment of wind turbine operations during test periods, identification of alternative...impact of wind turbines on ground-based and airborne radars, and this investment may help mitigate interference of wind turbines with test range...Frequency Active (SURTASS CLFA) Test Plan Tactical Unmanned Aircraft System Tactical Common Data Link (Shadow) FOT&E OTA Test Plan Tempest Wind 2014
Margaret A. Reams; Terry K. Haines; Cheryl R. Renner; Michael W. Wascom; Harish Kingre
2005-01-01
The dramatic expansion into the WildlandâUrban Interface (WUI) places property, natural assets, and human life at risk from wildfire destruction. The U.S. National Fire Plan encourages communities to implement laws and outreach programs for pre-fire planning to mitigate the risk to area residents. Starting in 2003, we surveyed the administrators of regulatory and...
NEOShield - A global approach to NEO Impact Threat Mitigation
NASA Astrophysics Data System (ADS)
Michel, Patrick
2015-03-01
NEOShield is a European-Union funded project coordinated by the German Aero-space Center, DLR, to address near-Earth object (NEO) impact hazard mitigation issues. The NEOShield consortium consists of 13 research institutes, universities, and industrial partners from 6 countries and includes leading US and Russian space organizations. The project is funded for a period of 3.5 years from January 2012 with a total of 5.8 million euros. The primary aim of the project is to investigate in detail promising mitigation techniques, such as the kinetic impactor, blast deflection, and the gravity tractor, and devise feasible demonstration missions. Options for an international strategy for implementation when an actual impact threat arises will also be investigated. The NEOShield work plan consists of scientific investigations into the nature of the impact hazard and the physical properties of NEOs, and technical and engineering studies of practical means of deflecting NEOs. There exist many ideas for asteroid deflection techniques, many of which would require considerable scientific and technological development. The emphasis of NEOShield is on techniques that are feasible with current technology, requiring a minimum of research and development work. NEOShield aims to provide detailed designs of feasible mitigation demonstration missions, targeting NEOs of the kind most likely to trigger the first space-based mitigation action. Most of the asteroid deflection techniques proposed to date require physical contact with the threatening object, an example being the kinetic impactor. NEOShield includes research into the mitigation-relevant physical properties of NEOs on the basis of remotely-sensed astronomical data and the results of rendezvous missions, the observational techniques required to efficiently gather mitigation-relevant data on the dynamical state and physical properties of a threatening NEO, and laboratory investigations using gas guns to fire projectiles into asteroid regolith analog materials. The gas-gun investigations enable state-of-the-art numerical models to be verified at small scales. Computer simulations at realistic NEO scales are used to investigate how NEOs with a range of properties would respond to a pulse of energy applied in a deflection attempt. The technical work includes the development of crucial technologies, such as the autonomous guidance of a kinetic impactor to a precise point on the surface of the target, and the detailed design of realistic missions for the purpose of demonstrating the applicability and feasibility of one or more of the techniques investigated. Theoretical work on the blast deflection method of mitigation is designed to probe the circumstances in which this last line of defense may be the only viable option and the issues relating to its deployment. A global response campaign roadmap will be developed based on realistic scenarios presented, for example, by the discovery of an object such as 99942 Apophis or 2011 AG5 on a threatening orbit. The work will include considerations of the timeline of orbit knowledge and impact probability development, reconnaissance observations and fly-by or rendezvous missions, the political decision to mount a mitigation attempt, and the design, development, and launch of the mitigation mission. Collaboration with colleagues outside the NEOShield Consortium involved in complementary activities (e.g. under the auspices of the UN, NASA, or ESA) is being sought in order to establish a broad international strategy. We present a brief overview of the history and planned scope of the project, and progress made to date. The NEOShield project (http://www.neoshield.net) has received funding from the European Union Seventh Framework Program (FP7/2007-2013) under Grant Agreement no. 282703.
Appalachian Stream Mitigation Workshop
A 5 day workshop in 2011 developed for state and federal regulatory and resource agencies, who review, comment on and/or approve compensatory mitigation plans for surface coal mining projects in Appalachia
A U.S. Biodefense Strategy Primer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poulin, D
2009-05-11
The anthrax mailings that followed the attacks of September 11, 2001 highlighted the need for a comprehensive national strategy to prevent, prepare for, respond to, and mitigate the effects of biological attacks. The goal of U.S. biodefense strategy is to reduce the likelihood of a future biological event, improve overall U.S. public health security, and minimize the economic and social disruption of a biological incident. Presidential communications, federal legislation, and executive agency planning documents provide the foundation for this strategy. Central to current U.S. biodefense strategy is the 2004 Homeland Security Presidential Directive (HSPD) 10, Biodefense for the 21st Century,more » which states that ''the United States will use all means necessary to prevent, protect against, and mitigate biological weapons attacks perpetrated against our homeland and our global interests.'' HSPD-10 also sets forth four pillars of U.S. biodefense: {sm_bullet} Threat awareness includes timely, accurate, and relevant intelligence, threat assessment, and the anticipation of future threats. {sm_bullet} Prevention and protection involve continuing and expanding efforts to limit access to agents, technologies, and knowledge to certain groups and countries as well as protecting critical infrastructure from the effects of biological attacks. {sm_bullet} Surveillance and detection provide early warning or recognition of biological attacks to permit a timely response and mitigation of consequences as well as attribution. {sm_bullet} Response and recovery include pre-attack planning and preparedness, capabilities to treat casualties, risk communications, physical control measures, medical countermeasures, and decontamination capabilities.« less
Group consensus peer review in radiation oncology: commitment to quality.
Duggar, W Neil; Bhandari, Rahul; Yang, Chunli Claus; Vijayakumar, Srinivasan
2018-03-27
Peer review, especially prospective peer review, has been supported by professional organizations as an important element in optimal Radiation Oncology practice based on its demonstration of efficacy at detecting and preventing errors prior to patient treatment. Implementation of peer review is not without barriers, but solutions do exist to mitigate or eliminate some of those barriers. Peer review practice at our institution involves three key elements: new patient conference, treatment planning conference, and chart rounds. The treatment planning conference is an adaptation of the group consensus peer review model from radiology which utilizes a group of peers reviewing each treatment plan prior to implementation. The peer group in radiation oncology includes Radiation Oncologists, Physician Residents, Medical Physicists, Dosimetrists, and Therapists. Thus, technical and clinical aspects of each plan are evaluated simultaneously. Though peer review is held in high regard in Radiation Oncology, many barriers commonly exist preventing optimal implementation such as time intensiveness, repetition, and distraction from clinic time with patients. Through the use of automated review tools and commitment by individuals and administration in regards to staffing, scheduling, and responsibilities, these barriers have been mitigated to implement this Group Consensus Peer Review model into a Radiation Oncology Clinic. A Group Consensus Peer Review model has been implemented with strategies to address common barriers to effective and efficient peer review.
Ratnapradipa, Dhitinut
2014-04-01
Climate change risk assessment, adaptation, and mitigation planning have become increasingly important to environmental health practitioners (EHPs). The NEHA/UL Sabbatical Exchange Award allowed me to investigate how EHPs in the UK are incorporating climate change planning and communication strategies into their work. Projected climate change risks in the UK include flooding, extreme heat, water shortages, severe weather, decreased air quality, and changes in vectors. Despite public perception and funding challenges, all the local government representatives with whom I met incorporated climate change risk assessment, adaptation, and mitigation planning into their work. The mandated Community Risk Register serves as a key planning document developed by each local government authority and is a meaningful way to look at potential climate change health risks. Adaptation and sustainability were common threads in my meetings. These often took the form of "going green" with transportation, energy efficiency, conserving resources, and building design because the efforts made sense monetarily as future cost savings. Communication strategies targeted a variety of audiences (EHPs, non-EHP government employees, politicians, and the general public) using a broad range of communication channels (professional training, lobbying, conferences and fairs, publications, print materials, Internet resources, social media, billboards, etc).
NASA Astrophysics Data System (ADS)
Auermuller, L. M.; Gatto, J.; Huch, C.
2015-12-01
The highly developed nature of New Jersey's coastline, barrier island and lagoon communities make them particularly vulnerable to storm surge, sea level rise and flooding. The impacts of Hurricane Sandy have enlightened coastal communities to these realities. Recognizing these vulnerabilities, the Jacques Cousteau National Research Reserve (JC NERR), Rutgers Center for Remote Sensing and Spatial Analysis (CRSSA), Rutgers Bloustein School and the Barnegat Bay Partnership (BBP) have developed web-based tools to assist NJ's coastal communities in visualizing and planning for future local impacts. NJFloodMapper and NJAdapt are two complementary interactive mapping websites that visualize different current and future flood hazards. These hazard layers can be combined with additional data including critical facilities, evacuation routes, socioeconomic and environmental data. Getting to Resilience is an online self-assessment tool developed to assist communities reduce vulnerability and increase preparedness by linking planning, mitigation, and adaptation. Through this interactive process communities will learn how their preparedness can yield valuable points through voluntary programs like FEMA's Community Rating System and Sustainable Jersey. The assessment process can also increase the community's understanding of where future vulnerabilities should be addressed through hazard mitigation planning. Since Superstorm Sandy, more than thirty communities in New Jersey have been provided technical assistance in assessing their risks and vulnerabilities to coastal hazards, and have begun to understand how to better plan and prepare for short and long-term changes along their shorelines.
NASA Astrophysics Data System (ADS)
Nadeau, D.; Girard, P.; Overby, M.; Pardyjak, E.; Stoll, R., II; Willemsen, P.; Bailey, B.; Parlange, M. B.
2015-12-01
Urban heat islands (UHI) are a real threat in many cities worldwide and mitigation measures have become a central component of urban planning strategies. Even within a city, causes of UHI vary from one neighborhood to another, mostly due the spatial variability in surface thermal properties, building geometry, anthropogenic heat flux releases and vegetation cover. As a result, the performance of UHI mitigation measures also varies in space. Hence, there is a need to develop a tool to quantify the efficiency of UHI mitigation measures at the neighborhood scale. The objective of this ongoing study is to validate the fast-response micrometeorological model QUIC EnvSim (QES). This model can provide all information required for UHI studies with a fine spatial resolution (up to 0.5m) and short computation time. QES combines QUIC, a CFD-based wind solver and dispersion model, and EnvSim, composed of a radiation model, a land-surface model and a turbulent transport model. Here, high-resolution (1 m) simulations are run over a subset of the École Polytechnique Fédérale de Lausanne (EPFL) campus including complex buildings, various surfaces properties and vegetation. For nearly five months in 2006-07, a dense network of meteorological observations (92 weather stations over 0.1 km2) was deployed over the campus and these unique data are used here as a validation dataset. We present validation results for different test cases (e.g., sunny vs cloudy days, different incoming wind speeds and directions) and explore the effect of a few UHI mitigation strategies on the spatial distribution of near-surface air temperatures. Preliminary results suggest that QES may be a valuable tool in decision-making regarding adaptation of urban planning to UHI.
GIS as a vital tool for Environmental Impact Assessment and Mitigation
NASA Astrophysics Data System (ADS)
Gharehbaghi, Koorosh; Scott-Young, Christina
2018-03-01
Environmental Impact Assessment (EIA) is a course of action which provides information to various stakeholders such as planners and relevant authorities about the planned development and its subsequent effects of the environment and the immediate ambiances. Furthermore, the EIA and mitigation are the inclusive process of collecting, analyzing information and the determination of the application for development or construction approval, which could be accessible by the concerned communities and organizations. Although the set regulations of EIA and mitigation vary from jurisdictions, they are, however, very precise and need to be integrated with the specific geographical data. In addition, the Geographical Information System (GIS) is a software intended to encapsulate and present all types of physical, biological, environmental, ecological and geological information. Conversely, GIS is the integration of statistical analysis and information technology, and can also be further broken down into two different categories of; Topological Modelling and Map overlay. To ensure that the EIA and mitigation are receptive the GIS will provide the decisive apparatus. Using GIS not only improves the overall EIA and mitigation process, but also provides valuable mapping strategies, including holistic environmental system approach. Accordingly, the main objective of this paper is to discuss the importance of the GIS and Environmental Data integration progression, to further enhance the overall EIA and Mitigation processes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gonzalez, Daniel; Wenick, Jess
The development of hydropower systems within the Columbia and Snake River basins has affected a tremendous amount of fish and wildlife species. The dams have played a major role in the rapid extinction of anadromous runs of salmon and steelhead as well as other native salmonids. Inundation of these dams and the construction of reservoirs for irrigation have also severely impacted wildlife species. In some cases, fluctuating water levels caused by dam and reservoir operations have created barren vegetation zones that expose wildlife to predation and a reduction in recruitment. In association with hydropower activities, secondary impacts have also challengedmore » and highly impacted a majority of wildlife species. The construction of roads, facilities, urban development, channelization, and diversions of streams and rivers often have negative long-term effects on fish, wildlife, and vegetation. In response to these concerns, the United States Congress passed the Pacific Electric Power Planning Conservation Act (Act) in 1980. The Act authorized four states (Idaho, Montana, Oregon and Washington) and 13 Indian Tribes (including the Burns Paiute Tribe) to create the Northwest Power Planning Council (Council). The role of the Council is to prepare a program in conjunction with several participants that protects, mitigates and enhances affected species within the Columbia River Basin and its tributaries. The Council's program, known as the Columbia River Basin's Fish and Wildlife Program (Program), has evolved over the years into a basin-wide approach that incorporates management plans for 52 subbasins. The Program includes a public involvement component that requires Program participants to provide the public with meaningful opportunities to comment on specific management proposals. Participants in this Program include the region's fish and wildlife agencies, Indian tribes, the public and an 11-member panel of scientists referred to as the Independent Scientific Review Panel (ISRP). Program participants are responsible for creating management plans for each of the 52 subbasins. Upon approval by the Council, the management plan is then incorporated into the Program. In 1998, the Tribe submitted two land acquisition proposals for funding through Bonneville's Wildlife Mitigation Program, the Logan Valley and Malheur River Wildlife Mitigation Projects. After several months of rigorous scrutiny and defense of its project presentations, the Tribe was awarded both acquisitions. In February of 2000, the Tribe and BPA entered into a Memorandum of Agreement (MOA) to fund the acquisition and management of Logan Valley and the Malheur River Projects. In April and November of 2000, the Tribe acquired the Logan Valley property (Project) and the Malheur River Wildlife Mitigation Project, respectively. The MOA requires the Tribe to dedicate the Project to wildlife habitat protection. Project management must be consistent with the term and conditions of the MOA and a site-specific management plan (Plan) that is to be prepared by the Tribe. The Malheur River Wildlife Mitigation Project (Denny Jones Ranch) allows the Tribe to manage 6,385 acres of meadow, wetland, and sagebrush steppe habitats along the Malheur River. The deeded property includes seven miles of the Malheur River, the largest private landholding along this waterway between Riverside and Harper. The property came with approximately 938 acres of senior water rights and 38,377 acres of federal and state grazing allotments. The project will benefit a diverse population of fish, wildlife, and plant species. Objectives include reviving and improving critical habitat for fish and wildlife populations, controlling/ eradicating weed populations, improving water quality, maintaining Bureau of Land Management (BLM) allotments, and preserving cultural resources. Before the Tribe acquired the project site, a combination of high levels of cattle stocking rates, management strategy, and a disruption of natural disturbance regimes compromised the property's ability to provide quality habitat to wildlife species found in the area. As a result, rangeland condition was depleted, exotic annual grasses and other noxious weeds began to invade native plant communities and many riparian areas were generally degraded. Native meadow communities were also leveled and planted with introduced species shortly after settlement and wildlife use and historic home ranges for migratory species have been severely altered. Current management is actively seeking to enhance the ability of the site's plant communities to support resident fauna that are known to have thrived in the area prior to settlement. The Tribe is utilizing a baseline approach to its overall land management by recognizing the importance of plant succession in achieving wildlife goal.« less
30 CFR 250.223 - What mitigation measures information must accompany the EP?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the EP? 250.223 Section 250.223 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE... Contents of Exploration Plans (ep) § 250.223 What mitigation measures information must accompany the EP? (a...
establishing a plan to allocate any funds the State receives from the Volkswagen Mitigation Trust Agreement Volkswagen Mitigation Trust Agreement; to offset oxides of nitrogen emissions from vehicles. For more
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... and development trends within the community so that mitigation options can be considered in future...
NASA Astrophysics Data System (ADS)
Thorne, James H.; Huber, Patrick R.; O'Donoghue, Elizabeth; Santos, Maria J.
2014-05-01
Globally, urban areas are expanding, and their regional, spatially cumulative, environmental impacts from transportation projects are not typically assessed. However, incorporation of a Regional Advance Mitigation Planning (RAMP) framework can promote more effective, ecologically sound, and less expensive environmental mitigation. As a demonstration of the first phase of the RAMP framework, we assessed environmental impacts from 181 planned transportation projects in the 19 368 km2 San Francisco Bay Area. We found that 107 road and railroad projects will impact 2411-3490 ha of habitat supporting 30-43 threatened or endangered species. In addition, 1175 ha of impacts to agriculture and native vegetation are expected, as well as 125 crossings of waterways supporting anadromous fish species. The extent of these spatially cumulative impacts shows the need for a regional approach to associated environmental offsets. Many of the impacts were comprised of numerous small projects, where project-by-project mitigation would result in increased transaction costs, land costs, and lost project time. Ecological gains can be made if a regional approach is taken through the avoidance of small-sized reserves and the ability to target parcels for acquisition that fit within conservation planning designs. The methods are straightforward, and can be used in other metropolitan areas.
Bryan, Brett A; Kandulu, John; Deere, Daniel A; White, Monique; Frizenschaf, Jacqueline; Crossman, Neville D
2009-07-01
Water-borne pathogens such as Cryptosporidium pose a significant human health risk and catchments provide the first critical pollution 'barrier' in mitigating risk in drinking water supply. In this paper we apply an adaptive management framework to mitigating Cryptosporidium risk in source water using a case study of the Myponga catchment in South Australia. Firstly, we evaluated the effectiveness of past water quality management programs in relation to the adoption of practices by landholders using a socio-economic survey of land use and management in the catchment. The impact of past management on the mitigation of Cryptosporidium risk in source water was also evaluated based on analysis of water quality monitoring data. Quantitative risk assessment was used in planning the next round of management in the adaptive cycle. Specifically, a pathogen budget model was used to identify the major remaining sources of Cryptosporidium in the catchment and estimate the mitigation impact of 30 alternative catchment management scenarios. Survey results show that earlier programs have resulted in the comprehensive adoption of best management practices by dairy farmers including exclusion of stock from watercourses and effluent management from 2000 to 2007. Whilst median Cryptosporidium concentrations in source water have decreased since 2004 they remain above target levels and put pressure on other barriers to mitigate risk, particularly the treatment plant. Non-dairy calves were identified as the major remaining source of Cryptosporidium in the Myponga catchment. The restriction of watercourse access of non-dairy calves could achieve a further reduction in Cryptosporidium export to the Myponga reservoir of around 90% from current levels. The adaptive management framework applied in this study was useful in guiding learning from past management, and in analysing, planning and refocusing the next round of catchment management strategies to achieve water quality targets.
The economics of abrupt climate change.
Perrings, Charles
2003-09-15
The US National Research Council defines abrupt climate change as a change of state that is sufficiently rapid and sufficiently widespread in its effects that economies are unprepared or incapable of adapting. This may be too restrictive a definition, but abrupt climate change does have implications for the choice between the main response options: mitigation (which reduces the risks of climate change) and adaptation (which reduces the costs of climate change). The paper argues that by (i) increasing the costs of change and the potential growth of consumption, and (ii) reducing the time to change, abrupt climate change favours mitigation over adaptation. Furthermore, because the implications of change are fundamentally uncertain and potentially very high, it favours a precautionary approach in which mitigation buys time for learning. Adaptation-oriented decision tools, such as scenario planning, are inappropriate in these circumstances. Hence learning implies the use of probabilistic models that include socioeconomic feedbacks.
Developing a congestion mitigation toolbox.
DOT National Transportation Integrated Search
2011-09-30
Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference for practitioners and an educational tool for elected officials acting through public policy boards to better understand the development, planning,...
Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less
Robert L. Ryan
2005-01-01
A series of syntheses were commissioned by the USDA Forest Service to aid in fuels mitigation project planning. This synthesis focuses on research addressing aesthetic considerations of fuels management. A general finding is that fuels management activities can contribute to the visual quality of a landscape. Topics covered in the synthesis include research findings on...
Jeffrey Prestemon
2011-01-01
Protecting constructed facilities from damages from natural and man-made hazards in a costeffective manner is a challenging task. Several measures of economic performance are available for evaluating building-related investments. These measures include, but are not limited to, life-cycle cost, present value net savings, savings-to-investment ratio, and adjusted...
Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hulett, David T.; Nosbisch, Michael R.
This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost,more » and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)« less
Enhancing infrastructure resilience through business continuity planning.
Fisher, Ronald; Norman, Michael; Klett, Mary
2017-01-01
Critical infrastructure is crucial to the functionality and wellbeing of the world around us. It is a complex network that works together to create an efficient society. The core components of critical infrastructure are dependent on one another to function at their full potential. Organisations face unprecedented environmental risks such as increased reliance on information technology and telecommunications, increased infrastructure interdependencies and globalisation. Successful organisations should integrate the components of cyber-physical and infrastructure interdependencies into a holistic risk framework. Physical security plans, cyber security plans and business continuity plans can help mitigate environmental risks. Cyber security plans are becoming the most crucial to have, yet are the least commonly found in organisations. As the reliance on cyber continues to grow, it is imperative that organisations update their business continuity and emergency preparedness activities to include this.
SU-E-J-15: A Patient-Centered Scheme to Mitigate Impacts of Treatment Setup Error
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yang, L; Southern Medical University, Guangzhou; Tian, Z
2014-06-01
Purpose: Current Intensity Modulated Radiation Therapy (IMRT) is plan-centered. At each treatment fraction, we position the patient to match the setup in treatment plan. Inaccurate setup can compromise delivered dose distribution, and hence leading to suboptimal treatments. Moreover, current setup approach via couch shift under image guidance can correct translational errors, while rotational and deformation errors are hard to address. To overcome these problems, we propose in this abstract a patient-centered scheme to mitigate impacts of treatment setup errors. Methods: In the patient-centered scheme, we first position the patient on the couch approximately matching the planned-setup. Our Supercomputing Online Replanningmore » Environment (SCORE) is then employed to design an optimal treatment plan based on the daily patient geometry. It hence mitigates the impacts of treatment setup error and reduces the requirements on setup accuracy. We have conducted simulations studies in 10 head-and-neck (HN) patients to investigate the feasibility of this scheme. Rotational and deformation setup errors were simulated. Specifically, 1, 3, 5, 7 degrees of rotations were put on pitch, roll, and yaw directions; deformation errors were simulated by splitting neck movements into four basic types: rotation, lateral bending, flexion and extension. Setup variation ranges are based on observed numbers in previous studies. Dosimetric impacts of our scheme were evaluated on PTVs and OARs in comparison with original plan dose with original geometry and original plan recalculated dose with new setup geometries. Results: With conventional plan-centered approach, setup error could lead to significant PTV D99 decrease (−0.25∼+32.42%) and contralateral-parotid Dmean increase (−35.09∼+42.90%). The patientcentered approach is effective in mitigating such impacts to 0∼+0.20% and −0.03∼+5.01%, respectively. Computation time is <128 s. Conclusion: Patient-centered scheme is proposed to mitigate setup error impacts using replanning. Its superiority in terms of dosimetric impacts and feasibility has been shown through simulation studies on HN cases.« less
A Michigan toolbox for mitigating traffic congestion.
DOT National Transportation Integrated Search
2011-09-30
"Researchers created A Michigan Toolbox for Mitigating Traffic Congestion to be a useful desk reference : for practitioners and an educational tool for elected officials acting through public policy boards to better : understand the development, plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sperling, Joshua B.; Ramaswami, Anu
This article reviews city case studies to inform a framework for developing urban infrastructure design standards and policy instruments that together aim to pursue energy efficiency and greenhouse gas mitigation through city carbon budgets and water use efficiency and climate risk adaptation through city water budgets. Here, this article also proposes combining carbon and water budgeting at the city-scale for achieving successful coupled city carbon and water budget (CCCWB) programs. Under a CCCWB program, key actors including local governments, infrastructure designers/operators, and households would be assigned a GHG emissions and water 'budget' and be required by state or federal levelsmore » to keep within this budget through the use of flexibility mechanisms, incentive programs, and sanctions. Multiple incentives and cross-scale governance arrangements would be tied to energy-water systems integration, resource-efficient transportation and infrastructure development, and effective monitoring and management of energy use, emissions, climate risks to, and security of energy-water-transport-food and other critical systems. As a first step to promote strategies for CCCWB development, we systematically review approaches of and shortcomings to existing budget-based programs in the UK and US, and suggest improvements in three areas: measurement, modeling effectiveness of interventions for staying within a budget, and governance. To date, the majority of climate action or sustainability plans by cities, while mentioning climate impacts as a premise for the plan, do not address these impacts in the plan. They focus primarily on GHG mitigation while ignoring resource depletion challenges and energy-climate-water linkages, whereby water supplies can begin to limit energy production and energy shifts to mitigate climate change can limit water availability. Coupled carbon-water budget plans, programs, and policies - described in this study- may address these concerns as well as the emerging trends that will exacerbate these problems - e.g., including population growth, climatic changes, and emerging policy choices that are not coordinated. Cities and 'Budget-Based' Management of the Energy-Water-Climate Nexus: Case Studies to Inform Strategy for Integrated Performance- and Incentive-Based Design and Policy Instruments.« less
Sperling, Joshua B.; Ramaswami, Anu
2017-11-03
This article reviews city case studies to inform a framework for developing urban infrastructure design standards and policy instruments that together aim to pursue energy efficiency and greenhouse gas mitigation through city carbon budgets and water use efficiency and climate risk adaptation through city water budgets. Here, this article also proposes combining carbon and water budgeting at the city-scale for achieving successful coupled city carbon and water budget (CCCWB) programs. Under a CCCWB program, key actors including local governments, infrastructure designers/operators, and households would be assigned a GHG emissions and water 'budget' and be required by state or federal levelsmore » to keep within this budget through the use of flexibility mechanisms, incentive programs, and sanctions. Multiple incentives and cross-scale governance arrangements would be tied to energy-water systems integration, resource-efficient transportation and infrastructure development, and effective monitoring and management of energy use, emissions, climate risks to, and security of energy-water-transport-food and other critical systems. As a first step to promote strategies for CCCWB development, we systematically review approaches of and shortcomings to existing budget-based programs in the UK and US, and suggest improvements in three areas: measurement, modeling effectiveness of interventions for staying within a budget, and governance. To date, the majority of climate action or sustainability plans by cities, while mentioning climate impacts as a premise for the plan, do not address these impacts in the plan. They focus primarily on GHG mitigation while ignoring resource depletion challenges and energy-climate-water linkages, whereby water supplies can begin to limit energy production and energy shifts to mitigate climate change can limit water availability. Coupled carbon-water budget plans, programs, and policies - described in this study- may address these concerns as well as the emerging trends that will exacerbate these problems - e.g., including population growth, climatic changes, and emerging policy choices that are not coordinated. Cities and 'Budget-Based' Management of the Energy-Water-Climate Nexus: Case Studies to Inform Strategy for Integrated Performance- and Incentive-Based Design and Policy Instruments.« less
43 CFR 10005.15 - Planning and management techniques applicable to the plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... applicable to the plan. 10005.15 Section 10005.15 Public Lands: Interior Regulations Relating to Public Lands... AND IMPLEMENTING THE COMMISSION'S MITIGATION AND CONSERVATION PLAN § 10005.15 Planning and management techniques applicable to the plan. The Commission recognizes that there are a wide range of techniques that...
Improving Empirical Approaches to Estimating Local Greenhouse Gas Emissions
NASA Astrophysics Data System (ADS)
Blackhurst, M.; Azevedo, I. L.; Lattanzi, A.
2016-12-01
Evidence increasingly indicates our changing climate will have significant global impacts on public health, economies, and ecosystems. As a result, local governments have become increasingly interested in climate change mitigation. In the U.S., cities and counties representing nearly 15% of the domestic population plan to reduce 300 million metric tons of greenhouse gases over the next 40 years (or approximately 1 ton per capita). Local governments estimate greenhouse gas emissions to establish greenhouse gas mitigation goals and select supporting mitigation measures. However, current practices produce greenhouse gas estimates - also known as a "greenhouse gas inventory " - of empirical quality often insufficient for robust mitigation decision making. Namely, current mitigation planning uses sporadic, annual, and deterministic estimates disaggregated by broad end use sector, obscuring sources of emissions uncertainty, variability, and exogeneity that influence mitigation opportunities. As part of AGU's Thriving Earth Exchange, Ari Lattanzi of City of Pittsburgh, PA recently partnered with Dr. Inez Lima Azevedo (Carnegie Mellon University) and Dr. Michael Blackhurst (University of Pittsburgh) to improve the empirical approach to characterizing Pittsburgh's greenhouse gas emissions. The project will produce first-order estimates of the underlying sources of uncertainty, variability, and exogeneity influencing Pittsburgh's greenhouse gases and discuss implications of mitigation decision making. The results of the project will enable local governments to collect more robust greenhouse gas inventories to better support their mitigation goals and improve measurement and verification efforts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, J. G.; Morton, R. L.; Castillo, C.
2011-02-01
A multi-level (facility and programmatic) risk assessment was conducted for the facilities in the Nevada National Security Site (NNSS) Readiness in Technical Base and Facilities (RTBF) Program and results were included in a new Risk Management Plan (RMP), which was incorporated into the fiscal year (FY) 2010 Integrated Plans. Risks, risk events, probability, consequence(s), and mitigation strategies were identified and captured, for most scope areas (i.e., risk categories) during the facilitated risk workshops. Risk mitigations (i.e., efforts in addition to existing controls) were identified during the facilitated risk workshops when the risk event was identified. Risk mitigation strategies fell intomore » two broad categories: threats or opportunities. Improvement projects were identified and linked to specific risks they mitigate, making the connection of risk reduction through investments for the annual Site Execution Plan. Due to the amount of that was collected, analysis to be performed, and reports to be generated, a Risk Assessment/ Management Tool (RAMtool) database was developed to analyze the risks in real-time, at multiple levels, which reinforced the site-level risk management process and procedures. The RAMtool database was developed and designed to assist in the capturing and analysis of the key elements of risk: probability, consequence, and impact. The RAMtool calculates the facility-level and programmatic-level risk factors to enable a side-by-side comparison to see where the facility manager and program manager should focus their risk reduction efforts and funding. This enables them to make solid decisions on priorities and funding to maximize the risk reduction. A more active risk management process was developed where risks and opportunities are actively managed, monitored, and controlled by each facility more aggressively and frequently. risk owners have the responsibility and accountability to manage their assigned risk in real-time, using the RAMtool database.« less
Visual Impairment/Intracranial Pressure Risk Assessment
NASA Technical Reports Server (NTRS)
Fogarty, Jennifer A.; Durham, T.; Otto, C.; Grounds, D.; Davis, J. R.
2010-01-01
Since 2006 there have been 6 reported cases of altered visual acuity and intracranial pressure (ICP) in long duration astronauts. In order to document this risk and develop an integrated approach to its mitigation, the NASA Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) have chosen to use the Human System Risk Board (HSRB) and the risk management analysis tool (RMAT). The HSRB is the venue in which the stakeholders and customers discuss and vet the evidence and the RMAT is the tool that facilitates documentation and comparison of the evidence across mission profiles as well as identification of risk factors, and documentation of mitigation strategies. This process allows for information to be brought forward and dispositioned so that it may be properly incorporated into the RMAT and contribute to the design of the research and mitigation plans. The evidence thus far has resulted in the identification of a visual impairment/intracranial pressure (VIIP) project team, updating of both short and long duration medical requirements designed to assess visual acuity, and a research plan to characterize this issue further. In order to understand this issue more completely, a plan to develop an Accelerated Research Collaboration (ARC) has been approved by the HSRB. The ARC is a novel research model pioneered by the Myelin Repair Foundation. It is a patient centered research model that brings together researchers and clinicians, under the guidance of a scientific advisory panel, to collaborate and produce results much quickly than accomplished through traditional research models. The data and evidence from the updated medical requirements and the VIIP ARC will be reviewed at the HSRB on a regular basis. Each review package presented to the HSRB will include an assessment and recommendation with respect to continuation of research, countermeasure development, occupational surveillance modalities, selection criteria, etc. This process will determine the course of the VIIP project and ultimately how SLSD and HRP mitigate this emerging human health and performance risk.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, Greg; Marotz, Brian L.; Dunnigan, James
''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, K.D.
2006-07-01
Nuclear facility decontamination, dismantlement, and demolition activities provide a myriad of challenges along the path to reaching a safe, effective, and compliant decommissioning. Among the challenges faced during decommissioning, is the constant management and technical effort to eliminate, mitigate, or minimize the potential of risks of radiation exposures and other hazards to the worker, the surrounding community, and the environment. Management strategies to eliminate, mitigate, or minimize risks include incorporating strong safety and As Low As Reasonably Achievable (ALARA) principles into an integrated work planning process. Technical and operational strategies may include utilizing predictive risk analysis tools to establish contaminationmore » limits for demolition and using remote handling equipment to reduce occupational and radiation exposures to workers. ECC and E2 Closure Services, LLC (Closure Services) have effectively utilized these management and technical tools to eliminate, mitigate, and reduce radiation exposures under contract to the U.S. Department of Energy (DOE) for the decontamination and decommissioning Columbus Closure Project (CCP). In particular, Closure Services achieved significant dose reduction during the dismantling, decontamination, and demolition activities for Building JN-1. Management strategies during the interior dismantlement, decontamination, and demolition of the facility demanded an integrated work planning processes that involved project disciplines. Integrated planning processes identified multiple opportunities to incorporate the use of remote handling equipment during the interior dismantling and demolition activities within areas of high radiation. Technical strategies employed predictive risk analysis tools to set upper bounding contamination limits, allowed for the radiological demolition of the building without exceeding administrative dose limits to the worker, general public, and the environment. Adhering to management and technical strategies during the dismantlement, decontamination, and demolition of Building JN-1 enabled Closure Services to achieve strong ALARA performance, maintain absolute compliance under the regulatory requirements and meeting licensing conditions for decommissioning. (authors)« less
Germaine Reyes-French; Timothy J. Cohen
1991-01-01
This paper outlines a mitigation program for pipeline construction impacts to oak tree habitat by describing the requirements for the Offsite Oak Mitigation Program for the All American Pipeline (AAPL) in Santa Barbara County, California. After describing the initial environmental analysis, the County regulatory structure is described under which the plan was required...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yde, Chis
1990-06-01
The Libby hydroelectric project, located on the Kootenai River in northwestern Montana, resulted in several impacts to the wildlife communities which occupied the habitats inundated by Lake Koocanusa. Montana Department of Fish, Wildlife and Parks, in cooperation with the other management agencies, developed an impact assessment and a wildlife and wildlife habitat mitigation plan for the Libby hydroelectric facility. In response to the mitigation plan, Bonneville Power Administration funded a cooperative project between the Kootenai National Forest and Montana Department of Fish, Wildlife and Parks to develop a long-term habitat enhancement plan for the bighorn sheep and mule deer wintermore » and spring ranges adjacent to Lake Koocanusa. The project goal is to rehabilitate 3372 acres of bighorn sheep and 16,321 acres of mule deer winter and spring ranges on Kootenai National Forest lands adjacent to Lake Koocanusa and to monitor and evaluate the effects of implementing this habitat enhancement work. 2 refs.« less
43 CFR 10005.17 - Plan development process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Plan development process. 10005.17 Section 10005.17 Public Lands: Interior Regulations Relating to Public Lands (Continued) UTAH RECLAMATION...'S MITIGATION AND CONSERVATION PLAN § 10005.17 Plan development process. Following adoption of the...
Genesis Contingency Planning and Mishap Recovery: The Sample Curation View
NASA Technical Reports Server (NTRS)
Stansbery, E. K.; Allton, J. H.; Allen, C. C.; McNamara, K. M.; Calaway, M.; Rodriques, M. C.
2007-01-01
Planning for sample preservation and curation was part of mission design from the beginning. One of the scientific objectives for Genesis included collecting samples of three regimes of the solar wind in addition to collecting bulk solar wind during the mission. Collectors were fabricated in different thicknesses for each regime of the solar wind and attached to separate frames exposed to the solar wind during specific periods of solar activity associated with each regime. The original plan to determine the solar regime sampled for specific collectors was to identify to which frame the collector was attached. However, the collectors were dislodged during the hard landing making identification by frame attachment impossible. Because regimes were also identified by thickness of the collector, the regime sampled is identified by measuring fragment thickness. A variety of collector materials and thin films applied to substrates were selected and qualified for flight. This diversity provided elemental measurement in more than one material, mitigating effects of diffusion rates and/or radiation damage. It also mitigated against different material and substrate strengths resulting in differing effects of the hard landing. For example, silicon crystal substrates broke into smaller fragments than sapphire-based substrates and diamond surfaces were more resilient to flying debris damage than gold. The primary responsibility of the curation team for recovery was process documentation. Contingency planning for the recovery phase expanded this responsibility to include not only equipment to document, but also gather, contain and identify samples from the landing area and the recovered spacecraft. The team developed contingency plans for various scenarios as part of mission planning that included topographic maps to aid in site recovery and identification of different modes of transport and purge capability depending on damage. A clean tent, set-up at Utah Test & Training Range to control the environment for processing the sample return capsule and cleanly installing a nitrogen purge to the canister, was used to control the environment for extracting collector fragments from the damaged canister and to document and package over 10,000 collector fragments.
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1992-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less
RE-PLAN: An Extensible Software Architecture to Facilitate Disaster Response Planning
O’Neill, Martin; Mikler, Armin R.; Indrakanti, Saratchandra; Tiwari, Chetan; Jimenez, Tamara
2014-01-01
Computational tools are needed to make data-driven disaster mitigation planning accessible to planners and policymakers without the need for programming or GIS expertise. To address this problem, we have created modules to facilitate quantitative analyses pertinent to a variety of different disaster scenarios. These modules, which comprise the REsponse PLan ANalyzer (RE-PLAN) framework, may be used to create tools for specific disaster scenarios that allow planners to harness large amounts of disparate data and execute computational models through a point-and-click interface. Bio-E, a user-friendly tool built using this framework, was designed to develop and analyze the feasibility of ad hoc clinics for treating populations following a biological emergency event. In this article, the design and implementation of the RE-PLAN framework are described, and the functionality of the modules used in the Bio-E biological emergency mitigation tool are demonstrated. PMID:25419503
NASA Astrophysics Data System (ADS)
Jones, L.
2014-12-01
In 2014, the USGS entered a technical assistance agreement with the City of Los Angeles to apply the results of the 2008 ShakeOut Scenario of a M7.8 earthquake on the southern San Andreas fault to develop a comprehensive plan to increase the seismic resilience of the City. The results of this project are to be submitted to the Mayor of Los Angeles at the Great ShakeOut on October 16, 2014. The ShakeOut scenario detailed how the expected cascade of failures in a big earthquake could lead to significant delays in disaster recovery that could create financial losses that greatly exceed the direct losses in the event. The goal of the seismic resilience plan is to: protect the lives of residents during earthquakes improve the capacity of the City to respond to the earthquake prepare the City to recover quickly after the earthquake so as to protect the economy of the City and all of southern California To accomplish these goals, the project addresses three areas of seismic vulnerability that were identified in the original ShakeOut Scenario: Pre-1980 buildings that present an unacceptable risk to the lives of residents, including "non-ductile reinforced concrete," and "soft-first-story" buildings Water system infrastructure (including impact on firefighting capability) Communications infrastructure The critical science needed to support policy decisions is to understand the probable consequences to the regional long-term economy caused by decisions to undertake (or not) different levels of mitigation. The arguments against mitigation are the immediate financial costs, so a better understanding of the eventual benefit is required. However, the direct savings rarely justify the mitigation costs, so the arguments in favor of mitigation are driven by the potential for cascading failures and the potential to trigger the type of long term reduction in population and economic activity that has occurred in New Orleans since Hurricane Katrina.
Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana.
Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S-N; Kirby, Ryan
2016-02-01
Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders.
Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana
Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S.-N.; Kirby, Ryan
2016-01-01
Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders. PMID:27330828
Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation.
Kennedy, Christina M; Miteva, Daniela A; Baumgarten, Leandro; Hawthorne, Peter L; Sochi, Kei; Polasky, Stephen; Oakleaf, James R; Uhlhorn, Elizabeth M; Kiesecker, Joseph
2016-07-01
Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development.
Emergency planning and preparedness for the deliberate release of toxic industrial chemicals.
Russell, David; Simpson, John
2010-03-01
Society in developed and developing countries is hugely dependent upon chemicals for health, wealth, and economic prosperity, with the chemical industry contributing significantly to the global economy. Many chemicals are synthesized, stored, and transported in vast quantities and classified as high production volume chemicals; some are recognized as being toxic industrial chemicals (TICs). Chemical accidents involving chemical installations and transportation are well recognized. Such chemical accidents occur with relative frequency and may result in large numbers of casualties with acute and chronic health effects as well as fatalities. The large-scale production of TICs, the potential for widespread exposure and significant public health impact, together with their relative ease of acquisition, makes deliberate release an area of potential concern. The large numbers of chemicals, together with the large number of potential release scenarios means that the number of possible forms of chemical incident are almost infinite. Therefore, prior to undertaking emergency planning and preparedness, it is necessary to prioritize risk and subsequently mitigate. This is a multi-faceted process, including implementation of industrial protection layers, substitution of hazardous chemicals, and relocation away from communities. Residual risk provides the basis for subsequent planning. Risk-prioritized emergency planning is a tool for identifying gaps, enhancing communication and collaboration, and for policy development. It also serves to enhance preparedness, a necessary prelude to preventing or mitigating the public health risk to deliberate release. Planning is an iterative and on-going process that requires multi-disciplinary agency input, culminating in the formation of a chemical incident plan complimentary to major incident planning. Preparedness is closely related and reflects a state of readiness. It is comprised of several components, including training and exercising. Toxicologists have a role to play in developing syndromic surveillance, recognizing clinical presentation of chemical incidents, developing toxicological datasheets, and the requisition and stockpiling of medical countermeasures. The chemical industry is global and many chemicals are synthesized and transported in vast quantities. Many of these chemicals are toxic and readily available, necessitating the need for identifying and assessing hazard and risks and subsequently planning and preparing for the deliberate release of TICs.
Determination of Section 404 Permit and Habitat Mitigation Requirements
DOT National Transportation Integrated Search
2012-09-01
The Arizona Department of Transportation (ADOT) is committed to developing habitat, mitigation, : monitoring, and maintenance plans that replace the loss of the functions and values of an area and : are self-sustaining, thereby providing long-term co...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... Waterbody Construction and Mitigation Procedures and Request for Comments The staff of the Office of Energy...) and Wetland and Waterbody Construction and Mitigation Procedures (Procedures), dated January 17, 2003...
Trial by fire: Community Wildfire Protection Plans put to the test
Pamela J. Jakes; Victoria Sturtevant
2013-01-01
Research has found that community wildfire protection planning can make significant contributions to wildfire mitigation and preparedness, but can the planning process and resulting Community Wildfire Protection Plans make a difference to wildfire response and recovery? In case studies conducted in four USA communities with Community Wildfire Protection Plans in place...
Rainwater Wildlife Area Management Plan : Executive Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.; Confederated Tribes of the Umatilla Indian Reservation in Oregon.
The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources. The Northwest Power Actmore » directs the NPPC to develop a program to ''protect, mitigate, and enhance'' fish and wildlife of the Columbia River and its tributaries. The overarching goals include: A Columbia River ecosystem that sustains an abundant, productive, and diverse community of fish and wildlife; Mitigation across the basin for the adverse effects to fish and wildlife caused by the development and operation of the hydrosystem; Sufficient populations of fish and wildlife for abundant opportunities for tribal trust and treaty right harvest and for non-tribal harvest; and Recovery of the fish and wildlife affected by the development and operation of the hydrosystem that are listed under the Endangered Species Act.« less
Scheutz, Charlotte; Pedersen, Rasmus Broe; Petersen, Per Haugsted; Jørgensen, Jørgen Henrik Bjerre; Ucendo, Inmaculada Maria Buendia; Mønster, Jacob G; Samuelsson, Jerker; Kjeldsen, Peter
2014-07-01
Methane generated at landfills contributes to global warming and can be mitigated by biocover systems relying on microbial methane oxidation. As part of a closure plan for an old unlined landfill without any gas management measures, an innovative biocover system was established. The system was designed based on a conceptual model of the gas emission patterns established through an initial baseline study. The study included construction of gas collection trenches along the slopes of the landfill where the majority of the methane emissions occurred. Local compost materials were tested as to their usefulness as bioactive methane oxidizing material and a suitable compost mixture was selected. Whole site methane emission quantifications based on combined tracer release and downwind measurements in combination with several local experimental activities (gas composition within biocover layers, flux chamber based emission measurements and logging of compost temperatures) proved that the biocover system had an average mitigation efficiency of approximately 80%. The study showed that the system also had a high efficiency during winter periods with temperatures below freezing. An economic analysis indicated that the mitigation costs of the biocover system were competitive to other existing greenhouse gas mitigation options. Copyright © 2014 Elsevier Ltd. All rights reserved.
Planning for Crew Exercise for Deep Space Mission Scenarios
NASA Technical Reports Server (NTRS)
Moore, E. Cherice; Ryder, Jeff
2015-01-01
Exercise which is necessary for maintaining crew health on-orbit and preparing the crew for return to 1G can be challenging to incorporate into spaceflight vehicles. Deep space missions will require further understanding of the physiological response to microgravity, understanding appropriate mitigations, and designing the exercise systems to effectively provide mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2013 CFR
2013-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2011 CFR
2011-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Code of Federal Regulations, 2012 CFR
2012-10-01
... SECURITY DISASTER ASSISTANCE MITIGATION PLANNING § 201.2 Definitions. Administrator means the head of the Federal Emergency Management Agency, or his/her designated representative. Flood Mitigation Assistance (FMA) means the program authorized by section 1366 of the National Flood Insurance Act of 1968, as...
Fuzak, Julia K; Elkon, Benjamin D; Hampers, Louis C; Polage, Kathleen J; Milton, Jerrod D; Powers, Linda K; Percell-de'Shong, Karen; Wathen, Joseph E
2010-07-01
To report an experience with large-scale rapid transportation of hospitalized children, highlighting elements applicable to a disaster event. This was a retrospective study of the relocation of an entire pediatric inpatient population. Mitigation steps included postponement of elective procedures, implementation of planned discharges, and transfer of selected patients to satellite hospitals. Drills and simulations were used to estimate travel times and develop contingency plans. A transfer queue was modified as necessary to account for changing acuity. The Hospital Incident Command System was used. Thirteen critical care teams, 5 general crews, 2 vans, and 4 other vehicles transferred a total of 111 patients 8.5 miles in 11.6 hours. Patients were transferred along parallel (vs series) circuits, allowing simultaneous movement of patients from different areas. Sixty-four patients (including 32 infants) were considered critically ill; 24 of these patients required ventilator support, 3 required inhaled nitric oxide, 30 required continuous infusions, and 4 had an external ventricular drain. There were no adverse outcomes. Mass inpatient pediatric transfers can be managed rapidly and safely with parallel transfers. Preexisting agreements with regional pediatric teams are imperative. Disaster preparedness concepts, including preplanning, evacuation priorities, recovery analysis, and prevention/mitigation, can be applied to this event. Copyright (c) 2010 Mosby, Inc. All rights reserved.
75 FR 54026 - Salvage and Marine Firefighting Requirements; Vessel Response Plans for Oil
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
... and Marine Firefighting Requirements; Vessel Response Plans for Oil AGENCY: Coast Guard, DHS. ACTION... vessel response plan salvage and marine firefighting requirements for tank vessels carrying oil. The... establish evidence that they have properly planned to mitigate oil outflow and to provide that information...
Dinitz, Laura B.
2008-01-01
With costs of natural disasters skyrocketing and populations increasingly settling in areas vulnerable to natural hazards, society is challenged to better allocate its limited risk-reduction resources. In 2000, Congress passed the Disaster Mitigation Act, amending the Robert T. Stafford Disaster Relief and Emergency Assistance Act (Robert T. Stafford Disaster Relief and Emergency Assistance Act, Pub. L. 93-288, 1988; Federal Emergency Management Agency, 2002, 2008b; Disaster Mitigation Act, 2000), mandating that State, local, and tribal communities prepare natural-hazard mitigation plans to qualify for pre-disaster mitigation grants and post-disaster aid. The Federal Emergency Management Agency (FEMA) was assigned to coordinate and implement hazard-mitigation programs, and it published information about specific mitigation-plan requirements and the mechanisms (through the Hazard Mitigation Grant Program-HMGP) for distributing funds (Federal Emergency Management Agency, 2002). FEMA requires that each community develop a mitigation strategy outlining long-term goals to reduce natural-hazard vulnerability, mitigation objectives and specific actions to reduce the impacts of natural hazards, and an implementation plan for those actions. The implementation plan should explain methods for prioritizing, implementing, and administering the actions, along with a 'cost-benefit review' justifying the prioritization. FEMA, along with the National Institute of Building Sciences (NIBS), supported the development of HAZUS ('Hazards U.S.'), a geospatial natural-hazards loss-estimation tool, to help communities quantify potential losses and to aid in the selection and prioritization of mitigation actions. HAZUS was expanded to a multiple-hazard version, HAZUS-MH, that combines population, building, and natural-hazard science and economic data and models to estimate physical damages, replacement costs, and business interruption for specific natural-hazard scenarios. HAZUS-MH currently performs analyses for earthquakes, floods, and hurricane wind. HAZUS-MH loss estimates, however, do not account for some uncertainties associated with the specific natural-hazard scenarios, such as the likelihood of occurrence within a particular time horizon or the effectiveness of alternative risk-reduction options. Because of the uncertainties involved, it is challenging to make informative decisions about how to cost-effectively reduce risk from natural-hazard events. Risk analysis is one approach that decision-makers can use to evaluate alternative risk-reduction choices when outcomes are unknown. The Land Use Portfolio Model (LUPM), developed by the U.S. Geological Survey (USGS), is a geospatial scenario-based tool that incorporates hazard-event uncertainties to support risk analysis. The LUPM offers an approach to estimate and compare risks and returns from investments in risk-reduction measures. This paper describes and demonstrates a hypothetical application of the LUPM for Ventura County, California, and examines the challenges involved in developing decision tools that provide quantitative methods to estimate losses and analyze risk from natural hazards.
NASA Astrophysics Data System (ADS)
Marozas, J. A.
2017-10-01
Cross-beam energy transfer (CBET) has been shown to significantly reduce the laser absorption and implosion speed in direct-drive implosion experiments on OMEGA and the National Ignition Facility (NIF). Mitigating CBET assists in achieving ignition-relevant hot-spot pressures in deuterium-tritium cryogenic OMEGA implosions. In addition, reducing CBET permits lower, more hydrodynamically stable, in-flight aspect ratio ignition designs with smaller nonuniformity growth during the acceleration phase. Detuning the wavelengths of the crossing beams is one of several techniques under investigation at the University of Rochester to mitigate CBET. This talk will describe these techniques with an emphasis on wavelength detuning. Recent experiments designed and predicted using multidimensional hydrodynamic simulations including CBET on the NIF have exploited the wavelength arrangement of the NIF beam geometry to demonstrate CBET mitigation through wavelength detuning in polar-direct-drive (PDD) implosions. Shapes and trajectories inferred from time-resolved x-ray radiography of the imploding shell, scattered-light spectra, and hard x-ray spectra generated by suprathermal electrons all indicate a reduction in CBET. These results and their implications for direct-drive ignition will be presented and discussed. In addition, hydrodynamically scaled ignition-relevant designs for OMEGA implosions exploiting wavelength detuning will be presented. Changes required to the OMEGA laser to permit wavelength detuning will be discussed. Future plans for PDD on the NIF including more-uniform implosions with CBET mitigation will be explored. This material is based upon work supported by the Department of Energy National Nuclear Security Administration under Award Number DE-NA0001944.
Co-control of urban air pollutants and greenhouse gases in Mexico City.
West, J Jason; Osnaya, Patricia; Laguna, Israel; Martínez, Julia; Fernández, Adrián
2004-07-01
This study addresses the synergies of mitigation measures to control urban air pollutant and greenhouse gas (GHG) emissions, in developing integrated "co-control" strategies for Mexico City. First, existing studies of emissions reduction measures--PROAIRE (the air quality plan for Mexico City) and separate GHG studies--are used to construct a harmonized database of options. Second, linear programming (LP) is developed and applied as a decision-support tool to analyze least-cost strategies for meeting co-control targets for multiple pollutants. We estimate that implementing PROAIRE measures as planned will reduce 3.1% of the 2010 metropolitan CO2 emissions, in addition to substantial local air pollutant reductions. Applying the LP, PROAIRE emissions reductions can be met at a 20% lower cost, using only the PROAIRE measures, by adjusting investments toward the more cost-effective measures; lower net costs are possible by including cost-saving GHG mitigation measures, but with increased investment. When CO2 emission reduction targets are added to PROAIRE targets, the most cost-effective solutions use PROAIRE measures for the majority of local pollutant reductions, and GHG measures for additional CO2 control. Because of synergies, the integrated planning of urban-global co-control can be beneficial, but we estimate that for Mexico City these benefits are often small.
Human Research Program Integrated Research Plan. Revision C
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2011-01-01
Crew health and performance are critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes (1) HRP's approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and (2) the method of integration for risk mitigation. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.
OEM Emergency Prevention and Mitigation Information
The Office of Emergency Management maintains information relevant to preventing emergencies before they occur, and/or mitigating the effects of emergency when they do occur. A principal element of this data asset is the information managed by the System for Risk Management Plans (SRMP), which compiles risk management plans submitted by facilities in accordance with the Clean Air Act, Section 112(r). Affected facilities are to develop risk management programs which will prevent and minimize consequences of accidental releases of certain hazardous chemicals that could harm public health and the environment.Another component of this data asset are the results generated by the Priority Assessment Model (PAM), which analyzes information concerning low-level chronic emissions from facilities and sets priorities (low, medium, high) for proactive controls on releases that do not necessarily pose imminent threats, but which may under adverse circumstances create unacceptable health or ecological risks.Also included are inspection records compiled by the Oil Inspection Program. Under the Clean Water Act Section 311, EPA regulates oil storage that meets a specific regulatory threshold. Facilities that store oil and meet the regulatory threshold need to prepare and implement a Spill Prevention, Control, and Countermeasures (SPCC) Plan which needs to be reviewed and approved by a professional engineer. Additionally, facilities with larger oil storage capacity may have to pre
DOT National Transportation Integrated Search
2014-08-01
Transportation agencies do their best to avoid : and minimize any impacts to the environment, : but some impacts are unavoidable. : Compensatory mitigation is used to offset these : unavoidable impacts to the environment. Over : $3.3 billion is spent...
NASA Astrophysics Data System (ADS)
Athanasopoulou, Evanthia; Despoiniadou, Varvara; Dritsos, Stefanos
2008-07-01
This paper examines the effects of the mortal earthquake on the city of Aigio in Greece in 1995, with particular focus on urbanization and planning policies. It is based on interviews with experts and surveys on damage to buildings following this earthquake. The analysis takes into account several factors, such as exact location, land use, construction period and the height of damaged buildings. Furthermore, the relationship between the seismic damage and the postseismic construction development of Aigio is examined and the conclusion is reached that the Greek urban planning system needs to be better organized to prepare for seismic damage. To this end, the paper recommends a five-point discussion agenda for applying local planning to seismic mitigation.
Douglas, Kevin S
2014-09-01
The conditional release of insanity acquittees requires decisions both about community risk level and the contextual factors that may mitigate or aggravate risk. This article discusses the potential role of the newly revised Historical-Clinical-Risk Management-20 (HCR-20, Version 3) within the conditional release context. A brief review of the structured professional judgment (SPJ) approach to violence risk assessment and management is provided. Version 2 of the HCR-20, which has been broadly adopted and evaluated, is briefly described. New features of Version 3 of the HCR-20 with particular relevance to conditional release decision-making are reviewed, including: item indicators; ratings of the relevance of risk factors to an individual's violence; risk formulation; scenario planning; and risk management planning. Version 3 of the HCR-20 includes a number of features that should assist evaluators and decision-makers to determine risk level, as well as to anticipate and specify community conditions and contexts that may mitigate or aggravate risk. Research on the HCR-20 Version 3 using approximately 800 participants across three settings (forensic psychiatric, civil psychiatric, correctional) and eight countries is reviewed. Copyright © 2014 John Wiley & Sons, Ltd.
Improving tsunami resiliency: California's Tsunami Policy Working Group
Real, Charles R.; Johnson, Laurie; Jones, Lucile M.; Ross, Stephanie L.; Kontar, Y.A.; Santiago-Fandiño, V.; Takahashi, T.
2014-01-01
California has established a Tsunami Policy Working Group to facilitate development of policy recommendations for tsunami hazard mitigation. The Tsunami Policy Working Group brings together government and industry specialists from diverse fields including tsunami, seismic, and flood hazards, local and regional planning, structural engineering, natural hazard policy, and coastal engineering. The group is acting on findings from two parallel efforts: The USGS SAFRR Tsunami Scenario project, a comprehensive impact analysis of a large credible tsunami originating from an M 9.1 earthquake in the Aleutian Islands Subduction Zone striking California’s coastline, and the State’s Tsunami Preparedness and Hazard Mitigation Program. The unique dual-track approach provides a comprehensive assessment of vulnerability and risk within which the policy group can identify gaps and issues in current tsunami hazard mitigation and risk reduction, make recommendations that will help eliminate these impediments, and provide advice that will assist development and implementation of effective tsunami hazard risk communication products to improve community resiliency.
Risk Mitigation for the Development of the New Ariane 5 On-Board Computer
NASA Astrophysics Data System (ADS)
Stransky, Arnaud; Chevalier, Laurent; Dubuc, Francois; Conde-Reis, Alain; Ledoux, Alain; Miramont, Philippe; Johansson, Leif
2010-08-01
In the frame of the Ariane 5 production, some equipment will become obsolete and need to be redesigned and redeveloped. This is the case for the On-Board Computer, which has to be completely redesigned and re-qualified by RUAG Space, as well as all its on-board software and associated development tools by ASTRIUM ST. This paper presents this obsolescence treatment, which has started in 2007 under an ESA contract, in the frame of ACEP and ARTA accompaniment programmes, and is very critical in technical term but also from schedule point of view: it gives the context and overall development plan, and details the risk mitigation actions agreed with ESA, especially those related to the development of the input/output ASIC, and also the on-board software porting and revalidation strategy. The efficiency of these risk mitigation actions has been proven by the outcome schedule; this development constitutes an up-to-date case for good practices, including some experience report and feedback for future other developments.
Gabardi, Steven; Tichy, Eric M
2013-03-01
To review the components of the Congressional mandate for risk evaluation and mitigation strategies (REMS) managed by the Food and Drug Administration and assess their impact on health care providers practicing within the organ transplant arena. A non-date-limited search of MEDLINE and EMBASE (January 2007-June 2012) was conducted by using the following search terms: risk evaluation and mitigation strategies, REMS, and organ transplant, including a query of the individual organs. Information from the Federal Register and the Food and Drug Administration was also evaluated. REMS are strategies implemented to manage known or potential risks associated with medications and to ensure ongoing pharmacovigilance throughout the life of a pharmaceutical product. Elements of REMS programs may consist of 3 levels: a medication guide, communication plan, and elements to assure safe use. A medication guide is used to help prevent serious adverse events, aid in patients' decision making, and enhance medication adherence. Communication plans help educate health care providers and encourage adherence with REMS. The elements to assure safe use is a restrictive process implemented when it is deemed necessary to ensure safe access for patients to products with known serious risks. In transplant medicine, REMS currently exist for belatacept (medication guide and communication plan) and the mycophenolic acid derivatives (medication guide and elements to assure safe use). REMS are another step in the evolution of the development and marketing of pharmaceutical agents. Use of REMS in solid-organ transplant is becoming common. Transplant clinicians must provide required patient education and become involved with other aspects of REMS implementation to reduce the serious risks of pharmaceuticals and to improve patients' outcomes.
Scaling roads and wildlife: The Cinderella principle
Bissonette, J.A.
2002-01-01
It is clear that a reduction in both direct and indirect effects of roads and road networks must be the goal of management agencies. However, increased permeability of roaded landscapes can only be achieved by up-front planning and subsequent mitigative actions. The key is to understand that roads must be made permeable to the movement of animals. More profoundly, ecosystem services, i.e., clean water, clean air, uncontaminated soil, natural landscapes, recreation opportunities, abundant wildlife, and life sustaining ecological processes must not be seriously impacted. In other words, quality of life as measured by ecosystem services should be a major component of the planning process when roads are constructed or improved. Mitigative structures exist to increase permeability of roads. Wildlife overpasses and underpasses, often referred to as ecoducts or green bridges, with associated structures to enable larger animals to exit the road right of way, e.g., earthen escape ramps (BISSONETTE and HAMMER, 2001), various culvert designs for smaller animals including badger pipes and amphibian and reptile tunnels, and fish ladders are but a small sampling of the structures already in place around the world. What is needed is attention to the big picture. Landscapes need to be reconnected and made more permeable. Responsible agencies and organizations need to be aggressive about promoting mitigations and a conservation ethic into road planning. Only with a broad based effort between a concerned public, a database to work from, and a willingness of responsible agencies, will the now very large virtual footprint of roads and road networks be reduced to more closely approximate the physical footprint. By embracing the Cinderella Principle of making the virtual shoe fit more closely the actual physical footprint of roads, we will be able to achieve a closer connection with ecological harmony with its resultant effect of abundant wildlife.
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2012 CFR
2012-10-01
... buildings, infrastructure, and critical facilities located in the identified hazard areas; (B) An estimate... particular emphasis on new and existing buildings and infrastructure. (iii) An action plan describing how the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scheutz, Charlotte; Pedersen, Rasmus Broe; Petersen, Per Haugsted
Highlights: • An innovative biocover system was constructed on a landfill cell to mitigate the methane emission. • The biocover system had a mitigation efficiently of typically 80%. • The system also worked efficiently at ambient temperatures below freezing. • A whole landfill emission measurement tool was required to document the biocover system efficiency. - Abstract: Methane generated at landfills contributes to global warming and can be mitigated by biocover systems relying on microbial methane oxidation. As part of a closure plan for an old unlined landfill without any gas management measures, an innovative biocover system was established. The systemmore » was designed based on a conceptual model of the gas emission patterns established through an initial baseline study. The study included construction of gas collection trenches along the slopes of the landfill where the majority of the methane emissions occurred. Local compost materials were tested as to their usefulness as bioactive methane oxidizing material and a suitable compost mixture was selected. Whole site methane emission quantifications based on combined tracer release and downwind measurements in combination with several local experimental activities (gas composition within biocover layers, flux chamber based emission measurements and logging of compost temperatures) proved that the biocover system had an average mitigation efficiency of approximately 80%. The study showed that the system also had a high efficiency during winter periods with temperatures below freezing. An economic analysis indicated that the mitigation costs of the biocover system were competitive to other existing greenhouse gas mitigation options.« less
Human Research Program Integrated Research Plan. Revision A January 2009
NASA Technical Reports Server (NTRS)
2009-01-01
The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.
Review of dust transport and mitigation technologies in lunar and Martian atmospheres
NASA Astrophysics Data System (ADS)
Afshar-Mohajer, Nima; Wu, Chang-Yu; Curtis, Jennifer Sinclair; Gaier, James R.
2015-09-01
Dust resuspension and deposition is a ubiquitous phenomenon in all lunar and Martian missions. The near-term plans to return to the Moon as a stepping stone to further exploration of Mars and beyond bring scientists' attention to development and evaluation of lunar and Martian dust mitigation technologies. In this paper, different lunar and Martian dust transport mechanisms are presented, followed by a review of previously developed dust mitigation technologies including fluidal, mechanical, electrical and passive self-cleaning methods for lunar/Martian installed surfaces along with filtration for dust control inside cabins. Key factors in choosing the most effective dust mitigation technology are recognized to be the dust transport mechanism, energy consumption, environment, type of surface materials, area of the surface and surface functionality. While electrical methods operating at higher voltages are identified to be suitable for small but light sensitive surfaces, pre-treatment of the surface is effective for cleaning thermal control surfaces, and mechanical methods are appropriate for surfaces with no concerns of light blockage, surface abrasion and 100% cleaning efficiency. Findings from this paper can help choose proper surface protection/cleaning for future space explorations. Hybrid techniques combining the advantages of different methods are recommended.
Integrating ecosystem-service tradeoffs into land-use decisions
Goldstein, Joshua H.; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C.
2012-01-01
Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O’ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests. PMID:22529388
Integrating ecosystem-service tradeoffs into land-use decisions.
Goldstein, Joshua H; Caldarone, Giorgio; Duarte, Thomas Kaeo; Ennaanay, Driss; Hannahs, Neil; Mendoza, Guillermo; Polasky, Stephen; Wolny, Stacie; Daily, Gretchen C
2012-05-08
Recent high-profile efforts have called for integrating ecosystem-service values into important societal decisions, but there are few demonstrations of this approach in practice. We quantified ecosystem-service values to help the largest private landowner in Hawaii, Kamehameha Schools, design a land-use development plan that balances multiple private and public values on its North Shore land holdings (Island of O'ahu) of ∼10,600 ha. We used the InVEST software tool to evaluate the environmental and financial implications of seven planning scenarios encompassing contrasting land-use combinations including biofuel feedstocks, food crops, forestry, livestock, and residential development. All scenarios had positive financial return relative to the status quo of negative return. However, tradeoffs existed between carbon storage and water quality as well as between environmental improvement and financial return. Based on this analysis and community input, Kamehameha Schools is implementing a plan to support diversified agriculture and forestry. This plan generates a positive financial return ($10.9 million) and improved carbon storage (0.5% increase relative to status quo) with negative relative effects on water quality (15.4% increase in potential nitrogen export relative to status quo). The effects on water quality could be mitigated partially (reduced to a 4.9% increase in potential nitrogen export) by establishing vegetation buffers on agricultural fields. This plan contributes to policy goals for climate change mitigation, food security, and diversifying rural economic opportunities. More broadly, our approach illustrates how information can help guide local land-use decisions that involve tradeoffs between private and public interests.
How much do hazard mitigation plans cost? An analysis of federal grant data.
Jackman, Andrea M; Beruvides, Mario G
2013-01-01
Under the Disaster Mitigation Act of 2000 and Federal Emergency Management Agency's subsequent Interim Final Rule, the requirement was placed on local governments to author and gain approval for a Hazard Mitigation Plan (HMP) for the areas under their jurisdiction. Low completion percentages for HMPs--less than one-third of eligible governments--were found by an analysis conducted 3 years after the final deadline for the aforementioned legislation took place. Follow-up studies showed little improvement at 5 and 8 years after the deadline. It was hypothesized that the cost of a HMP is a significant factor in determining whether or not a plan is completed. A study was conducted using Boolean Matrix Analysis methods to determine what, if any, characteristics of a certain community will most influence the cost of a HMP. The frequency of natural hazards experienced by the planning area, the number of jurisdictions participating in the HMEP, the population, and population density were found to significantly affect cost. These variables were used in a regression analysis to determine their predictive power for cost. It was found that along with two interaction terms, the variables explain approximately half the variation in HMP cost.
Lower Clearwater Aquatic Mammal Survey. Final Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mack, Curt; Kronemann, Loren A.; Eneas, Cheryl
BPA provided funding to collect baseline data on river otters to assist in developing mitigation implementation plans for river otters percent to the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program, sections 1003 (b)(2) and (3). Distribution, movements, habitat use, and diets of river otters were investigated in the Clearwater River within the Nez Perce Indian Reservation from 1991-1992. The study outlined recommendations to guide development of mitigation implementation plans for riparian habitats. Sections of the Clearwater River were identified that if protected or enhanced would provide optimal benefit to otters. Habitat improvement alternatives were also outlinedmore » which could be used to enhance otter habitats.« less
Flight Test Hazard Planning Near the Speed of Light
NASA Technical Reports Server (NTRS)
Henwood, Bart; Huete, Rod
2007-01-01
A viewgraph presentation describing flight test safety near the speed of light is shown. The topics include: 1) Concept; 2) Portal Content; 3) Activity to Date; 4) FTS Database Updatd FAA Program; 5) FAA Flight Test Risk Management; 6) CFR 14 Part 21.35 Current and proposed changes; 7) An Online Resource for Flight Test Safety Planning; 8) Data Gathering; 9) NTPS Role; 10) Example Maturation; 11) Many Varied Inputs; 12) Matured Stall Hazards; 13) Loss of Control Mitigations; 14) FAA Access; 15) NASA PBMA Website Link; 16) FAR Reference Search; 17) Record Field Search; 18) Keyword Search; and 19) Results of FAR Reference Search.
Buildings: Mitigation Opportunities with a Focus on Health Implications
For Frank Princiotta’s book, Global Climate Change—The Technology Challenge Addressing building energy use is the critical first step in any strategic plan for mitigating climate change. Buildings have a direct impact on estimated global climate change due to their large carbon ...
23 CFR 777.9 - Mitigation of impacts.
Code of Federal Regulations, 2010 CFR
2010-04-01
... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...
23 CFR 777.9 - Mitigation of impacts.
Code of Federal Regulations, 2011 CFR
2011-04-01
... existing degraded or historic wetlands or natural habitats through restoration or enhancement on or off... or natural habitats on or off site. Restoration of wetlands is generally preferable to enhancement or... transportation planning processes. (d) Mitigation or restoration of historic impacts to wetlands and natural...
Designing climate change mitigation plans that add up.
Bajželj, Bojana; Allwood, Julian M; Cullen, Jonathan M
2013-07-16
Mitigation plans to combat climate change depend on the combined implementation of many abatement options, but the options interact. Published anthropogenic emissions inventories are disaggregated by gas, sector, country, or final energy form. This allows the assessment of novel energy supply options, but is insufficient for understanding how options for efficiency and demand reduction interact. A consistent framework for understanding the drivers of emissions is therefore developed, with a set of seven complete inventories reflecting all technical options for mitigation connected through lossless allocation matrices. The required data set is compiled and calculated from a wide range of industry, government, and academic reports. The framework is used to create a global Sankey diagram to relate human demand for services to anthropogenic emissions. The application of this framework is demonstrated through a prediction of per-capita emissions based on service demand in different countries, and through an example showing how the "technical potentials" of a set of separate mitigation options should be combined.
Bigger is better: Improved nature conservation and economic returns from landscape-level mitigation
Kennedy, Christina M.; Miteva, Daniela A.; Baumgarten, Leandro; Hawthorne, Peter L.; Sochi, Kei; Polasky, Stephen; Oakleaf, James R.; Uhlhorn, Elizabeth M.; Kiesecker, Joseph
2016-01-01
Impact mitigation is a primary mechanism on which countries rely to reduce environmental externalities and balance development with conservation. Mitigation policies are transitioning from traditional project-by-project planning to landscape-level planning. Although this larger-scale approach is expected to provide greater conservation benefits at the lowest cost, empirical justification is still scarce. Using commercial sugarcane expansion in the Brazilian Cerrado as a case study, we apply economic and biophysical steady-state models to quantify the benefits of the Brazilian Forest Code (FC) under landscape- and property-level planning. We find that FC compliance imposes small costs to business but can generate significant long-term benefits to nature: supporting 32 (±37) additional species (largely habitat specialists), storing 593,000 to 2,280,000 additional tons of carbon worth $69 million to $265 million ($ pertains to U.S. dollars), and marginally improving surface water quality. Relative to property-level compliance, we find that landscape-level compliance reduces total business costs by $19 million to $35 million per 6-year sugarcane growing cycle while often supporting more species and storing more carbon. Our results demonstrate that landscape-level mitigation provides cost-effective conservation and can be used to promote sustainable development. PMID:27419225
Mitigating Adverse Effects of a Human Mission on Possible Martian Indigenous Ecosystems
NASA Technical Reports Server (NTRS)
Lupisella, M. L.
2000-01-01
Although human beings are, by most standards, the most capable agents to search for and detect extraterrestrial life, we are also potentially the most harmful. While there has been substantial work regarding forward contamination with respect to robotic missions, the issue of potential adverse effects on possible indigenous Martian ecosystems, such as biological contamination, due to a human mission has remained relatively unexplored and may require our attention now as this presentation will try to demonstrate by exploring some of the relevant scientific questions, mission planning challenges, and policy issues. An informal, high-level mission planning decision tree will be discussed and is included as the next page of this abstract. Some of the questions to be considered are: (1) To what extent could contamination due to a human presence compromise possible indigenous life forms? (2) To what extent can we control contamination? For example, will it be local or global? (3) What are the criteria for assessing the biological status of Mars, both regionally and globally? For example, can we adequately extrapolate from a few strategic missions such as sample return missions? (4) What should our policies be regarding our mission planning and possible interaction with what are likely to be microbial forms of extraterrestrial life? (5) Central to the science and mission planning issues is the role and applicability of terrestrial analogs, such as Lake Vostok for assessing drilling issues, and modeling techniques. Central to many of the policy aspects are scientific value, international law, public concern, and ethics. Exploring this overall issue responsibly requires an examination of all these aspects and how they interrelate. A chart is included, titled 'Mission Planning Decision Tree for Mitigating Adverse Effects to Possible Indigenous Martian Ecosystems due to a Human Mission'. It outlines what questions scientists should ask and answer before sending humans to Mars.
Mitigating Adverse Effects of a Human Mission on Possible Martian Indigenous Ecosystems
NASA Astrophysics Data System (ADS)
Lupisella, M. L.
2000-07-01
Although human beings are, by most standards, the most capable agents to search for and detect extraterrestrial life, we are also potentially the most harmful. While there has been substantial work regarding forward contamination with respect to robotic missions, the issue of potential adverse effects on possible indigenous Martian ecosystems, such as biological contamination, due to a human mission has remained relatively unexplored and may require our attention now as this presentation will try to demonstrate by exploring some of the relevant scientific questions, mission planning challenges, and policy issues. An informal, high-level mission planning decision tree will be discussed and is included as the next page of this abstract. Some of the questions to be considered are: (1) To what extent could contamination due to a human presence compromise possible indigenous life forms? (2) To what extent can we control contamination? For example, will it be local or global? (3) What are the criteria for assessing the biological status of Mars, both regionally and globally? For example, can we adequately extrapolate from a few strategic missions such as sample return missions? (4) What should our policies be regarding our mission planning and possible interaction with what are likely to be microbial forms of extraterrestrial life? (5) Central to the science and mission planning issues is the role and applicability of terrestrial analogs, such as Lake Vostok for assessing drilling issues, and modeling techniques. Central to many of the policy aspects are scientific value, international law, public concern, and ethics. Exploring this overall issue responsibly requires an examination of all these aspects and how they interrelate. A chart is included, titled 'Mission Planning Decision Tree for Mitigating Adverse Effects to Possible Indigenous Martian Ecosystems due to a Human Mission'. It outlines what questions scientists should ask and answer before sending humans to Mars.
A systematic conservation planning approach to fire risk management in Natura 2000 sites.
Foresta, Massimiliano; Carranza, Maria Laura; Garfì, Vittorio; Di Febbraro, Mirko; Marchetti, Marco; Loy, Anna
2016-10-01
A primary challenge in conservation biology is to preserve the most representative biodiversity while simultaneously optimizing the efforts associated with conservation. In Europe, the implementation of the Natura 2000 network requires protocols to recognize and map threats to biodiversity and to identify specific mitigation actions. We propose a systematic conservation planning approach to optimize management actions against specific threats based on two fundamental parameters: biodiversity values and threat pressure. We used the conservation planning software Marxan to optimize a fire management plan in a Natura 2000 coastal network in southern Italy. We address three primary questions: i) Which areas are at high fire risk? ii) Which areas are the most valuable for threatened biodiversity? iii) Which areas should receive priority risk-mitigation actions for the optimal effect?, iv) which fire-prevention actions are feasible in the management areas?. The biodiversity values for the Natura 2000 spatial units were derived from the distribution maps of 18 habitats and 89 vertebrate species of concern in Europe (Habitat Directive 92/43/EEC). The threat pressure map, defined as fire probability, was obtained from digital layers of fire risk and of fire frequency. Marxan settings were defined as follows: a) planning units of 40 × 40 m, b) conservation features defined as all habitats and vertebrate species of European concern occurring in the study area, c) conservation targets defined according with fire sensitivity and extinction risk of conservation features, and d) costs determined as the complement of fire probabilities. We identified 23 management areas in which to concentrate efforts for the optimal reduction of fire-induced effects. Because traditional fire prevention is not feasible for most of policy habitats included in the management areas, alternative prevention practices were identified that allows the conservation of the vegetation structure. The proposed approach has potential applications for multiple landscapes, threats and spatial scales and could be extended to other valuable natural areas, including protected areas. Copyright © 2016 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Lynett, P. J.; Miller, K.; Eskijian, M.; Dengler, L. A.; Ayca, A.; Keen, A.; Admire, A. R.; Siegel, J.; Johnson, L. A.; Curtis, E.; Hornick, M.
2015-12-01
The 2010 Chile and 2011 Japan tsunamis both struck the California coast offering valuable experience and raised a number of significant issues for harbor masters, port captains, and other maritime entities. There was a general call for more planning products to help guide maritime communities in their tsunami response, mitigation, and recovery activities. The State of California is working with the U.S. Federal Emergency Management Agency (FEMA), the U.S. National Tsunami Hazard Mitigation Program (NTHMP), and other tsunami experts to provide communities with new tsunami planning tools to address these issues: Response Playbooks and plans have been developed for ports and harbors identifying potential tsunami current hazards and related damage for various size events. Maps have been generated showing minor, moderate, and severe damage levels that have been linked to current velocity thresholds of 3, 6, and 9 knots, respectively. Knowing this information allows harbor personnel to move ships or strengthen infrastructure prior to the arrival of distant source tsunamis. Damage probability tools and mitigation plans have been created to help reduce tsunami damage by evaluating the survivability of small and large vessels in harbors and ports. These results were compared to the actual damage assessments performed in California and Japan following the 2011 Japanese tsunami. Fragility curves were developed based on current velocity and direction to help harbor and port officials upgrade docks, piles, and related structures. Guidance documents are being generated to help in the development of both local and statewide recovery plans. Additional tools, like post-tsunami sediment and debris movement models, will allow harbors and ports to better understand if and where recovery issues are most likely to occur. Streamlining the regulatory and environmental review process is also a goal of the guidance. These maritime products and procedures are being integrated into guidance through the NTHMP to help other U.S. states/territories/commonwealths develop their own tsunami planning tools. This will lead to more accurate, consistent, and cost-effective tsunami planning strategies within the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen B.
This Executive Summary provides an overview of the Draft Rainwater Wildlife Area Management Plan. The comprehensive plan can be viewed on the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) website at: www.umatilla.nsn.us or requested in hard copy from the CTUIR at the address below. The wildlife area was established in September 1998 when the CTUIR purchased the Rainwater Ranch through Bonneville Power Administration (BPA) for purposes of fish and wildlife mitigation for the McNary and John Day dams. The Management Plan has been developed under a standardized planning process developed by BPA for Columbia River Basin Wildlife Mitigation Projectsmore » (See Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into a 5-Year Action Plan that will focus management actions and prioritize funding during the 2002-2006 planning period. Since acquisition of the property in late 1998, the CTUIR has conducted an extensive baseline resource assessment in preparation for the management plan, initiated habitat restoration in the Griffin Fork drainage to address road-related resource damage caused by roads constructed for forest practices and an extensive flood event in 1996, and initiated infrastructure developments associated with the Access and Travel Management Plan (i.e., installed parking areas, gates, and public information signs). In addition to these efforts, the CTUIR has worked to set up a long-term funding mechanism with BPA through the NPPC Fish and Wildlife Program. The CTUIR has also continued to coordinate closely with local and state government organizations to ensure consistency with local land use laws and maintain open lines of communication regarding important issues such as big game hunting, tribal member exercise of treaty rights, and public access. During the past two years, non-Indian public concern over big game hunting issues has at times overwhelmed other issues related to the wildlife area. In 2001, the CTUIR Fish and Wildlife Committee closed the wildlife area to tribal branch antlered bull elk harvest in response to harvest data that indicated harvest rates were greater than expected. In addition, illegal harvest of mature bull elk in southeastern Washington during the 2001 season exceeded the legal tribal and nontribal harvest combined which has created a potential significant regression in the bull;cow ratio in the Blue Mountain Elk herd. CTUIR Fish and Wildlife Committee and staff and Washington Department of Fish and Wildlife Regional Director and staff have been coordinating regularly to develop strategies to address harvest rates and ensure protection of viable big game herds in southeastern Washington. The CTUIR Fish and Wildlife Committee and WDFW has jointly agreed to continue close coordination on this and other issues and continue working together to ensure the long-term vigor of the elk herd on the Rainwater Wildlife Area. The purpose of the project is to protect, enhance, and mitigate fish and wildlife resources impacted by Columbia River Basin hydroelectric development. The effort is one of several wildlife mitigation projects in the region developed to compensate for terrestrial habitat losses resulting from the construction of McNary and John Day Hydroelectric facilities located on the mainstem Columbia River. While this project is driven primarily by the purpose and need to mitigate for wildlife habitat losses, it is also recognized that management strategies will also benefit many other non-target fish and wildlife species and associated natural resources.« less
Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators.
Singer, Andrew C; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn
2016-01-01
The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England's regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed.
Review of Antimicrobial Resistance in the Environment and Its Relevance to Environmental Regulators
Singer, Andrew C.; Shaw, Helen; Rhodes, Vicki; Hart, Alwyn
2016-01-01
The environment is increasingly being recognized for the role it might play in the global spread of clinically relevant antibiotic resistance. Environmental regulators monitor and control many of the pathways responsible for the release of resistance-driving chemicals into the environment (e.g., antimicrobials, metals, and biocides). Hence, environmental regulators should be contributing significantly to the development of global and national antimicrobial resistance (AMR) action plans. It is argued that the lack of environment-facing mitigation actions included in existing AMR action plans is likely a function of our poor fundamental understanding of many of the key issues. Here, we aim to present the problem with AMR in the environment through the lens of an environmental regulator, using the Environment Agency (England’s regulator) as an example from which parallels can be drawn globally. The issues that are pertinent to environmental regulators are drawn out to answer: What are the drivers and pathways of AMR? How do these relate to the normal work, powers and duties of environmental regulators? What are the knowledge gaps that hinder the delivery of environmental protection from AMR? We offer several thought experiments for how different mitigation strategies might proceed. We conclude that: (1) AMR Action Plans do not tackle all the potentially relevant pathways and drivers of AMR in the environment; and (2) AMR Action Plans are deficient partly because the science to inform policy is lacking and this needs to be addressed. PMID:27847505
Albeni Falls Wildlife Mitigation : Annual Report 2002.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terra-Berns, Mary
The Albeni Falls Interagency Work Group continued to actively engage in implementing wildlife mitigation actions in 2002. Regular Work Group meetings were held to discuss budget concerns affecting the Albeni Falls Wildlife Mitigation Program, to present potential acquisition projects, and to discuss and evaluate other issues affecting the Work Group and Project. Work Group members protected 1,386.29 acres of wildlife habitat in 2002. To date, the Albeni Falls project has protected approximately 5,914.31 acres of wildlife habitat. About 21% of the total wildlife habitat lost has been mitigated. Administrative activities have increased as more properties are purchased and continue tomore » center on restoration, operation and maintenance, and monitoring. In 2001, Work Group members focused on development of a monitoring and evaluation program as well as completion of site-specific management plans. This year the Work Group began implementation of the monitoring and evaluation program performing population and plant surveys, data evaluation and storage, and map development as well as developing management plans. Assuming that the current BPA budget restrictions will be lifted in the near future, the Work Group expects to increase mitigation properties this coming year with several potential projects.« less
Strategic Planning for Drought Mitigation Under Climate Change
NASA Astrophysics Data System (ADS)
Cai, X.; Zeng, R.; Valocchi, A. J.; Song, J.
2012-12-01
Droughts continue to be a major natural hazard and mounting evidence of global warming confronts society with a pressing question: Will climate change aggravate the risk of drought at local scale? It is important to explore what additional risk will be imposed by climate change and what level of strategic measures should be undertaken now to avoid vulnerable situations in the future, given that tactical measures may not avoid large damage. This study addresses the following key questions on strategic planning for drought mitigation under climate change: What combination of strategic and tactical measures will move the societal system response from a vulnerable situation to a resilient one with minimum cost? Are current infrastructures and their operation enough to mitigate the damage of future drought, or do we need in-advance infrastructure expansion for future drought preparedness? To address these questions, this study presents a decision support framework based on a coupled simulation and optimization model. A quasi-physically based watershed model is established for the Frenchman Creek Basin (FCB), part of the Republic River Basin, where groundwater based irrigation plays a significant role in agriculture production and local hydrological cycle. The physical model is used to train a statistical surrogate model, which predicts the watershed responses under future climate conditions. The statistical model replaces the complex physical model in the simulation-optimization framework, which makes the models computationally tractable. Decisions for drought preparedness include traditional short-term tactical measures (e.g. facility operation) and long-term or in-advance strategic measures, which require capital investment. A scenario based three-stage stochastic optimization model assesses the roles of strategic measures and tactical measures in drought preparedness and mitigation. Two benchmark climate prediction horizons, 2040s and 2090s, represent mid-term and long-term planning, respectively, compared to the baseline of the climate of 1980-2000. To handle uncertainty in climate change projections, outputs from three General Circulation Models (GCMs) with Regional Climate Model (RCM) for dynamic downscaling (PCM-RCM, Hadley-RCM, and CCSM-RCM) and four CO2 emission scenarios are used to represent the various possible climatic conditions in the mid-term (2040's) and long-term (2090's) time horizons. The model results show the relative roles of mid- and long-term investments and the complementary relationships between wait-and-see decisions and here-and-now decisions on infrastructure expansion. Even the best tactical measures (irrigation operation) alone are not sufficient for drought mitigation in the future. Infrastructure expansion is critical especially for environmental conversation purposes. With increasing budget, investment should be shifted from tactical measures to strategic measures for drought preparedness. Infrastructure expansion is preferred for the long term plan than the mid-term plan, i.e., larger investment is proposed in 2040s than the current, due to a larger likelihood of drought in 2090s than 2040s. Thus larger BMP expansion is proposed in 2040s for droughts preparedness in 2090s.
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Eble, M. C.
2013-12-01
The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is comprised of representatives from coastal states and federal agencies who, under the guidance of NOAA, work together to develop protocols and products to help communities prepare for and mitigate tsunami hazards. Within the NTHMP are several subcommittees responsible for complimentary aspects of tsunami assessment, mitigation, education, warning, and response. The Mapping and Modeling Subcommittee (MMS) is comprised of state and federal scientists who specialize in tsunami source characterization, numerical tsunami modeling, inundation map production, and warning forecasting. Until September 2012, much of the work of the MMS was authorized through the Tsunami Warning and Education Act, an Act that has since expired but the spirit of which is being adhered to in parallel with reauthorization efforts. Over the past several years, the MMS has developed guidance and best practices for states and territories to produce accurate and consistent tsunami inundation maps for community level evacuation planning, and has conducted benchmarking of numerical inundation models. Recent tsunami events have highlighted the need for other types of tsunami hazard analyses and products for improving evacuation planning, vertical evacuation, maritime planning, land-use planning, building construction, and warning forecasts. As the program responsible for producing accurate and consistent tsunami products nationally, the NTHMP-MMS is initiating a multi-year plan to accomplish the following: 1) Create and build on existing demonstration projects that explore new tsunami hazard analysis techniques and products, such as maps identifying areas of strong currents and potential damage within harbors as well as probabilistic tsunami hazard analysis for land-use planning. 2) Develop benchmarks for validating new numerical modeling techniques related to current velocities and landslide sources. 3) Generate guidance and protocols for the production and use of new tsunami hazard analysis products. 4) Identify multistate collaborations and funding partners interested in these new products. Application of these new products will improve the overall safety and resilience of coastal communities exposed to tsunami hazards.
15 CFR 923.25 - Shoreline erosion/mitigation planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... purpose in developing this planning process is to give special attention to erosion issues. This special management attention may be achieved by designating erosion areas as areas of particular concern pursuant to...
Planning for Flood Recovery and Long-Term Resilience in Vermont
Vermont requested technical assistance from EPA and FEMA that focused on incorporating smart growth principles into state policies, local development regulations, and Hazard Mitigation Plans to increase community flood resilience.
44 CFR 201.4 - Standard State Mitigation Plans.
Code of Federal Regulations, 2011 CFR
2011-10-01
... reduce risks from natural hazards and serves as a guide for State decision makers as they commit resources to reducing the effects of natural hazards. (b) Planning process. An effective planning process is... risk assessments must characterize and analyze natural hazards and risks to provide a statewide...
50 CFR 216.175 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...
The Role of Compensation Criteria to Minimize Face-Time Bias and Support Faculty Career Flexibility
Elsbach, Kimberly D.; Villablanca, Amparo C.
2016-01-01
Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school’s policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear “face-time bias,” which negatively affects evaluation of those not “seen” at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department. PMID:28725757
Policy Development for Biodiversity Offsets: A Review of Offset Frameworks
NASA Astrophysics Data System (ADS)
McKenney, Bruce A.; Kiesecker, Joseph M.
2010-01-01
Biodiversity offsets seek to compensate for residual environmental impacts of planned developments after appropriate steps have been taken to avoid, minimize or restore impacts on site. Offsets are emerging as an increasingly employed mechanism for achieving net environmental benefits, with offset policies being advanced in a wide range of countries (i.e., United States, Australia, Brazil, Colombia, and South Africa). To support policy development for biodiversity offsets, we review a set of major offset policy frameworks—US wetlands mitigation, US conservation banking, EU Natura 2000, Australian offset policies in New South Wales, Victoria, and Western Australia, and Brazilian industrial and forest offsets. We compare how the frameworks define offset policy goals, approach the mitigation process, and address six key issues for implementing offsets: (1) equivalence of project impacts with offset gains; (2) location of the offset relative to the impact site; (3) “additionality” (a new contribution to conservation) and acceptable types of offsets; (4) timing of project impacts versus offset benefits; (5) offset duration and compliance; and (6) “currency” and mitigation replacement ratios. We find substantial policy commonalities that may serve as a sound basis for future development of biodiversity offsets policy. We also identify issues requiring further policy guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; and (3) determine appropriate mitigation replacement ratios.
Policy development for biodiversity offsets: a review of offset frameworks.
McKenney, Bruce A; Kiesecker, Joseph M
2010-01-01
Biodiversity offsets seek to compensate for residual environmental impacts of planned developments after appropriate steps have been taken to avoid, minimize or restore impacts on site. Offsets are emerging as an increasingly employed mechanism for achieving net environmental benefits, with offset policies being advanced in a wide range of countries (i.e., United States, Australia, Brazil, Colombia, and South Africa). To support policy development for biodiversity offsets, we review a set of major offset policy frameworks-US wetlands mitigation, US conservation banking, EU Natura 2000, Australian offset policies in New South Wales, Victoria, and Western Australia, and Brazilian industrial and forest offsets. We compare how the frameworks define offset policy goals, approach the mitigation process, and address six key issues for implementing offsets: (1) equivalence of project impacts with offset gains; (2) location of the offset relative to the impact site; (3) "additionality" (a new contribution to conservation) and acceptable types of offsets; (4) timing of project impacts versus offset benefits; (5) offset duration and compliance; and (6) "currency" and mitigation replacement ratios. We find substantial policy commonalities that may serve as a sound basis for future development of biodiversity offsets policy. We also identify issues requiring further policy guidance, including how best to: (1) ensure conformance with the mitigation hierarchy; (2) identify the most environmentally preferable offsets within a landscape context; and (3) determine appropriate mitigation replacement ratios.
Drought processes, modeling, and mitigation
NASA Astrophysics Data System (ADS)
Mishra, Ashok K.; Sivakumar, Bellie; Singh, Vijay P.
2015-07-01
Accurate assessment of droughts is crucial for proper planning and management of our water resources, environment, and ecosystems. The combined influence of increasing water demands and the anticipated impacts of global climate change has already raised serious concerns about worsening drought conditions in the future and their social, economic, and environmental impacts. As a result, studies on droughts are currently a major focal point for a broad range of research communities, including civil engineers, hydrologists, environmentalists, ecologists, meteorologists, geologists, agricultural scientists, economists, policy makers, and water managers. There is, therefore, an urgent need for enhancing our understanding of droughts (e.g. occurrence, modeling), making more reliable assessments of their impacts on various sectors of our society (e.g. domestic, agricultural, industrial), and undertaking appropriate adaptation and mitigation measures, especially in the face of global climate change.
Potentials for sustainable transportation in cities to alleviate climate change impacts.
Mashayekh, Yeganeh; Jaramillo, Paulina; Samaras, Constantine; Hendrickson, Chris T; Blackhurst, Michael; MacLean, Heather L; Matthews, H Scott
2012-03-06
Reducing greenhouse gas emissions (GHG) is an important social goal to mitigate climate change. A common mitigation paradigm is to consider strategy "wedges" that can be applied to different activities to achieve desired GHG reductions. In this policy analysis piece, we consider a wide range of possible strategies to reduce light-duty vehicle GHG emissions, including fuel and vehicle options, low carbon and renewable power, travel demand management and land use changes. We conclude that no one strategy will be sufficient to meet GHG emissions reduction goals to avoid climate change. However, many of these changes have positive combinatorial effects, so the best strategy is to pursue combinations of transportation GHG reduction strategies to meet reduction goals. Agencies need to broaden their agendas to incorporate such combination in their planning.
Results of the UCAR 2008 Forum on Climate Mitigation and Adaptation
NASA Astrophysics Data System (ADS)
Fellows, J.; Barron, E.
2008-12-01
Mayors, governors, and local decision makers are developing climate change action plans. They are not waiting for the federal carbon emission reduction debates to conclude (e.g., cap and trade or carbon tax legislation). Many of them are struggling with what should be in these plans, what they should be assuming about future weather and climate trends, and what the impact might be on their community and its infrastructure. In October 2008, the University Corporation for Atmospheric Research held a forum at its 2008 Members' Meeting that focused on the UCAR community's role in climate change adaptation and mitigation. Many of UCAR's 71 university members are involved in projects with local and regional decision makers struggling with planning for the future in the face of climate change. The forum focused on the following questions: 1. How are these projects working and what lessons have we learned? 2. What can our community can do to assist these partnerships (e.g., models and other tools, better information, training opportunities, outreach, sharing ideas, etc.)? 3. Can we help our nation deal more effectively with climate mitigation and adaptation by being more strategic with these partnerships (e.g., more coordination, creating packages of tools and information, creating common approaches to climate action plans, developing better communication tools, community strategic planning effort, etc.)? This presentation will provide a summary of the forum outcomes.
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2011 CFR
2011-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2010 CFR
2010-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2012 CFR
2012-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2014 CFR
2014-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.98 - Mitigation banks and in-lieu fee programs.
Code of Federal Regulations, 2013 CFR
2013-07-01
... must be planned and designed to be self-sustaining over time, but some active management and... based approach, to the extent practicable, while still meeting the decision-making time frames specified... watershed approach to the extent practicable in reviewing proposed mitigation banks and in-lieu fee programs...
40 CFR 230.95 - Ecological performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... mitigation plan must contain performance standards that will be used to assess whether the project is... mitigation project, so that the project can be objectively evaluated to determine if it is developing into... verifiable. Ecological performance standards must be based on the best available science that can be measured...
30 CFR 250.254 - What mitigation measures information must accompany the DPP or DOCD?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What mitigation measures information must accompany the DPP or DOCD? 250.254 Section 250.254 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT... Information Contents of Development and Production Plans (dpp) and Development Operations Coordination...
Since late-1984, EPA's AEERL has supported a program to develop and demonstrate radon mitigation techniques for single-family detached dwellings. As part of the program, projects have been started directed at developing and demonstrating the use of diagnostic measurements in all ...
DOT National Transportation Integrated Search
2011-01-01
This report presents the mitigation strategies and demonstration/pilot projects that are recommended to enhance performance and reduce the occurrence of pavements exhibiting accelerated aging or deterioration. The report is grouped into two parts, fo...
Bigard, Charlotte; Pioch, Sylvain; Thompson, John D
2017-09-15
Natural habitat loss and fragmentation, as a result of development projects, are major causes of biodiversity erosion. Environmental impact assessment (EIA) is the most commonly used site-specific planning tool that takes into account the effects of development projects on biodiversity by integrating potential impacts into the mitigation hierarchy of avoidance, reduction, and offset measures. However, the extent to which EIA fully address the identification of impacts and conservation stakes associated with biodiversity loss has been criticized in recent work. In this paper we examine the extent to which biodiversity criteria have been integrated into 42 EIA from 2006 to 2016 for small development projects in the Montpellier Metropolitan territory in southern France. This study system allowed us to question how EIA integrates biodiversity impacts on a scale relevant to land-use planning. We examine how biodiversity inclusion has changed over time in relation to new policy for EIA and how the mitigation hierarchy is implemented in practice and in comparison with national guidelines. We demonstrate that the inclusion of biodiversity features into EIA has increased significantly in relation to policy change. Several weaknesses nevertheless persist, including the continued absence of substitution solution assessment, a correct analysis of cumulative impacts, the evaluation of impacts on common species, the inclusion of an ecological network scale, and the lack of monitoring and evaluation measures. We also show that measures for mitigation hierarchy are primarily associated with the reduction of impacts rather than their avoidance, and avoidance and offset measures are often misleadingly proposed in EIA. There is in fact marked semantic confusion between avoidance, reduction and offset measures that may impair stakeholders' understanding. All in all, reconsideration of stakeholders routine practices associated with a more strategic approach towards impact anticipation and avoidance at a land-use planning scale is now necessary for the mitigation hierarchy to become a clear and practical hierarchy for "no net loss" objectives based on conservation priorities. Copyright © 2017 Elsevier Ltd. All rights reserved.
40 CFR 300.210 - Federal contingency plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... contingency plans under the national response system: The National Contingency Plan, RCPs, and ACPs. These... discharge under § 300.324, and to mitigate or prevent a substantial threat of such a discharge, from a vessel, offshore facility, or onshore facility operating in or near the area. (2) The areas of...
ERIC Educational Resources Information Center
Hutchins, Holly M.; Annulis, Heather; Gaudet, Cyndi
2008-01-01
Modern organizations constantly face unparalleled changes and uncertainty in the competitive world, thus requiring strategic planning to mitigate crisis conditions. Underscoring crisis plans are performance interventions that prepare employees, technological systems, and the organizational culture to effectively respond to a crisis event. However,…
Risk management and disaster recovery planning for online libraries.
Uzwyshyn, Ray
2015-01-01
This article presents an overview of risk management and disaster recovery planning for online libraries. It is suitable for a broad audience interested in online libraries and research centers in universities and colleges. It outlines risk mitigation strategies, and disaster recover planning for online resource-centered information systems.
DOD Product Support Business Case Analysis Guidebook
2011-04-01
Mitigation Plans ................................................................................................ 30 4.8 Sensitivity Analysis...Product Support BCA concludes with a recommendation and associated specific actions and an implementation plan to achieve stated organizational...primary executer of the actions and recommendations derived out of the BCA. Within the program office, the PSM has the responsibility to plan
Iowa Climate Change Adaptation and Resilience Report
The findings of a pilot project to work with stakeholders and governments in Iowa to identify barriers to and incentives for considering regional effects of climate change in hazard mitigation planning and other community planning processes.
Drainage network optimization for inundation mitigation case study of ITS Surabaya
NASA Astrophysics Data System (ADS)
Savitri, Yang Ratri; Lasminto, Umboro
2017-06-01
Institut Teknologi Sepuluh Nopember (ITS) Surabaya is one of engineering campus in Surabaya with an area of ± 187 ha, which consists of building and campus facilities. The campus is supported by drainage system planned according to the ITS Master Plan on 2002. The drainage system is planned with numbers of retention and detention pond based on the city concept of Zero Delta Q concept. However, in the rainy season, it frequently has inundation problems in several locations. The problems could be identified from two major sources, namely the internal campus facilities and external condition connected with the city drainage system. This paper described the capabilities of drainage network optimization to mitigate local urban drainage problem. The hydrology-hydraulic investigation was done by utilizing the Storm Water Management Model (SWMM) developed by US Environmental Protection Agency (EPA). The mitigation is based on several alternative that based on the existing condition and regarding the social problem. The study results showed that the management of the flow from external source could reduce final stored volume of the campus main channel by 31.75 %.
The influence of mitigation on sage-grouse habitat selection within an energy development field.
Fedy, Bradley C; Kirol, Christopher P; Sutphin, Andrew L; Maechtle, Thomas L
2015-01-01
Growing global energy demands ensure the continued growth of energy development. Energy development in wildlife areas can significantly impact wildlife populations. Efforts to mitigate development impacts to wildlife are on-going, but the effectiveness of such efforts is seldom monitored or assessed. Greater sage-grouse (Centrocercus urophasianus) are sensitive to energy development and likely serve as an effective umbrella species for other sagebrush-steppe obligate wildlife. We assessed the response of birds within an energy development area before and after the implementation of mitigation action. Additionally, we quantified changes in habitat distribution and abundance in pre- and post-mitigation landscapes. Sage-grouse avoidance of energy development at large spatial scales is well documented. We limited our research to directly within an energy development field in order to assess the influence of mitigation in close proximity to energy infrastructure. We used nest-location data (n = 488) within an energy development field to develop habitat selection models using logistic regression on data from 4 years of research prior to mitigation and for 4 years following the implementation of extensive mitigation efforts (e.g., decreased activity, buried powerlines). The post-mitigation habitat selection models indicated less avoidance of wells (well density β = 0.18 ± 0.08) than the pre-mitigation models (well density β = -0.09 ± 0.11). However, birds still avoided areas of high well density and nests were not found in areas with greater than 4 wells per km2 and the majority of nests (63%) were located in areas with ≤ 1 well per km2. Several other model coefficients differed between the two time periods and indicated stronger selection for sagebrush (pre-mitigation β = 0.30 ± 0.09; post-mitigation β = 0.82 ± 0.08) and less avoidance of rugged terrain (pre-mitigation β = -0.35 ± 0.12; post-mitigation β = -0.05 ± 0.09). Mitigation efforts implemented may be responsible for the measurable improvement in sage-grouse nesting habitats within the development area. However, we cannot reject alternative hypotheses concerning the influence of population density and intraspecific competition. Additionally, we were unable to assess the actual fitness consequences of mitigation or the source-sink dynamics of the habitats. We compared the pre-mitigation and post-mitigation models predicted as maps with habitats ranked from low to high relative probability of use (equal-area bins: 1 - 5). We found more improvement in habitat rank between the two time periods around mitigated wells compared to non-mitigated wells. Informed mitigation within energy development fields could help improve habitats within the field. We recommend that any mitigation effort include well-informed plans to monitor the effectiveness of the implemented mitigation actions that assess both habitat use and relevant fitness parameters.
Social and ethical perspectives of landslide risk mitigation measures
NASA Astrophysics Data System (ADS)
Kalsnes, Bjørn; Vangelsten, Bjørn V.
2015-04-01
Landslide risk may be mitigated by use of a wide range of measures. Mitigation and prevention options may include (1) structural measures to reduce the frequency, severity or exposure to the hazard, (2) non-structural measures, such as land-use planning and early warning systems, to reduce the hazard frequency and consequences, and (3) measures to pool and transfer the risks. In a given situation the appropriate system of mitigation measures may be a combination of various types of measures, both structural and non-structural. In the process of choosing mitigation measures for a given landslide risk situation, the role of the geoscientist is normally to propose possible mitigation measures on basis of the risk level and technical feasibility. Social and ethical perspectives are often neglected in this process. However, awareness of the need to consider social as well as ethical issues in the design and management of mitigating landslide risk is rising. There is a growing understanding that technical experts acting alone cannot determine what will be considered the appropriate set of mitigation and prevention measures. Issues such as environment versus development, questions of acceptable risk, who bears the risks and benefits, and who makes the decisions, also need to be addressed. Policymakers and stakeholders engaged in solving environmental risk problems are increasingly recognising that traditional expert-based decision-making processes are insufficient. This paper analyse the process of choosing appropriate mitigation measures to mitigate landslide risk from a social and ethical perspective, considering technical, cultural, economical, environmental and political elements. The paper focus on stakeholder involvement in the decision making process, and shows how making strategies for risk communication is a key for a successful process. The study is supported by case study examples from Norway and Italy. In the Italian case study, three different risk mitigation options was presented to the local community. The options were based on a thorough stakeholder involvement process ending up in three different views on how to deal with the landslide risk situation: i) protect lives and properties (hierarchical) ; ii) careful stewardship of the mountains (egalitarian); and iii) rational individual choice (individualist).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Oggerino, J.; Rabinowitz, M.
1998-06-01
Natural and person-caused disasters are increasing in frequency and magnitude, and these disasters are taking an ever increasing economic and personal toll. This report identifies technologies that can help utilities, their customers, and their communities cope with disasters. Each year, 10,000 violent thunderstorms, 5,000 floods, and 1,000 tornadoes strike the US. These and other natural events have cost at least $8 billion per year over the last 30 years, and the annual costs are increasing rapidly. In 1996, the US experienced twice the yearly average of declared disasters than in the previous twenty years. Damage from Hurricane Andrew and themore » Northridge earthquake resulted in losses of $30 and $25 billion respectively. As a result of these and other costly disasters, utilities are losing business and commercial customers. In response, federal, state, and local organizations have steeped up efforts to deploy mitigation technologies and techniques and business recovery support. A task within the EPRI Disaster Planning and Mitigation Technologies (DP and MT) Target seeks to identify technologies that can help utilities and their customers prepare for and recover from natural disasters. This report provides concise and directed product information that can help member utilities and the communities they serve to plan for, mitigate, and recover quickly from natural and person-caused disasters. This will enable them to retain customers and reduce revenue losses.« less
National Contingency Plan (NCP) Subpart J Product Schedule Fact Sheet
This section of the National Oil and Hazardous Substances Pollution Contingency Plan stipulates the criteria for listing and managing the use of dispersants and other chemical and biological agents used to mitigate oil spills.
National Contingency Plan Subpart J
Subpart J of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP) directs EPA to prepare a schedule of dispersants, other chemicals, and oil spill mitigating devices and substances that may be used to remove or control oil discharges.
NASA Astrophysics Data System (ADS)
Kalika, S.
2012-12-01
In commercial development or K-12 school construction, project sites are often purchased and much of the planning process completed prior to an assessment of the soils proposed for excavation or potential offhaul. Geologic maps, while initially helpful for identifying potential hazards such as landslides and earthquake faults, are less helpful in the identification of naturally occurring hazardous minerals, such as the seven regulated minerals currently classified as asbestos. Geologic maps identify mafic and ultramafic bedrock zones; however, a skilled geologist with knowledge of asbestos hazards will further visualize the earth-shaping processes that may have resulted in the deposition of naturally occurring asbestos in locations outside mapped ultramafic zones including the base of an alluvial fan or within streambed channels. When sampled as an afterthought prior to disposal, property owners are surprised by the budget-crippling costs of waste handling and disposal of NOA, as well as mitigations required to protect the health of construction workers, the public, and future site occupants. The California Air Resources Board (CARB) continues to lead the way in evaluation and regulation of NOA, through development of the CARB 435 preparation and laboratory analytical method, local enforcement of the Asbestos Airborne Toxic Control Measure for Construction, Grading, Quarrying, and Surface Mining Operations (ATCM), and implementation of dust control measures to protect public health. A thorough site evaluation and construction design includes utilization of the sampling methods developed by the California Geological Survey, laboratory analytical methods within CARB 435, and mitigation measures required by CARB, DTSC, and OSHA for the protection of worker and public health after NOA is discovered. The site evaluation should additionally include an assessment of the future site usage, as regulations differ based on potential health affects to future occupants. Construction and long-term monitoring at an elementary school differs in regulatory requirements from construction of a commercial property. This presentation will highlight two case studies: a school project with several years of advance planning versus a commercial property where NOA was discovered weeks before the start of construction. The presentation will analyze the regulatory differences, mitigation measures, and consideration of the financial impacts that the discovery of NOA can have on a school versus a commercial project.
Proceedings of the Second NASA Aviation Safety Program Weather Accident Prevention Review
NASA Technical Reports Server (NTRS)
Martzaklis, K. Gus (Compiler)
2003-01-01
The Second NASA Aviation Safety Program (AvSP) Weather Accident Prevention (WxAP) Annual Project Review held June 5-7, 2001, in Cleveland, Ohio, presented the NASA technical plans and accomplishments to the aviation community. NASA-developed technologies presented included an Aviation Weather Information System with associated digital communications links, electronic atmospheric reporting technologies, forward-looking turbulence warning systems, and turbulence mitigation procedures. The meeting provided feedback and insight from the aviation community of diverse backgrounds and assisted NASA in steering its plans in the direction needed to meet the national safety goal of 80-percent reduction of aircraft accidents by 2007. The proceedings of the review are enclosed.
Bjugn, Roger; Hansen, Jarle
2013-08-01
Biorepositories may be affected by a number of emergencies ranging from bad publicity to natural disasters, and biorepositories should have plans for handling such situations. The emergency management process includes all phases from mitigation to recovery. Fire is one disaster that may cause extensive damage to both physical structures and humans. In this article, we analyze events related to a fire in a storage facility for mechanical freezers. The analysis covers both the pre-crisis stage, the fire itself, and the post-crisis stage. Even the best intended planning cannot stop a crisis from happening. However, an open-minded analysis of the crisis with focus on learning and quality improvement can improve an organization's ability to handle the next emergency situation.
GHG emission mitigation measures and technologies in the Czech Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tichy, M.
1996-12-31
The paper presents a short overview of main results in two fields: projection of GHG emission from energy sector in the Czech Republic and assessment of technologies and options for GHG mitigation. The last part presents an overview of measures that were prepared for potential inclusion to the Czech Climate Change Action Plan.
78 FR 13844 - Change in Submission Requirements for State Mitigation Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
... protecting human lives and the environment. No action that FEMA can anticipate under this rule will have a... to reduce damage to lives, property, and the economy from future disasters. State, Tribal, and local... funding for eligible mitigation activities that reduce disaster losses and protect life and property from...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Casey, Daniel; Malta, Patrick
1990-06-01
Project goals are to rehabilitate 1120 acres of big game (elk and mule deer, Odocoileus hemionus) winter range on the Hungry Horse and Spotted Bear Districts of Flathead National Forest lands adjacent to Hungry Horse Reservoir. This project represents the initial phase of implementation toward the mitigation goal. A minimum of 547 acres Trust-funded enhancements are called for in this plan. The remainder are part of the typical Forest Service management activities for the project area. Monitor and evaluate the effects of project implementation on the big game forage base and elk and mule deer populations in the project area.more » Monitor enhancement success to determine effective acreage to be credited against mitigation goal. Additional enhancement acreage will be selected elsewhere in the Flathead Forest or other lands adjacent'' to the reservoir based on progress toward the mitigation goal as determined through monitoring. The Wildlife Mitigation Trust Fund Advisory Committee will serve to guide decisions regarding future enhancement efforts. 7 refs.« less
An effective public health program to reduce urban heat islands in Québec, Canada.
Beaudoin, Mélanie; Gosselin, Pierre
2016-09-01
In 2005, the Government of the Province of Québec, Canada, adopted the Climate Change Action Plan for 2006 - 2012. The Institut national de santé publique du Québec (National Institute of Public Health of Québec), charged with implementing the health adaptation component of the Plan, worked to mitigate urban heat islands (UHI) by funding and evaluating 40 pilot projects. These projects explored different methods of fighting UHIs by greening cities in a participative and mobilizing approach led mainly by non-governmental organizations and municipalities. An assessment of temperatures before and after implementing various methods demonstrated that some actions enabled significant gains of coolness and more efficiently mitigated heat (reduction of concrete/asphalt surfaces, increasing vegetation, etc.). An assessment of quality of life showed that projects were positively received by users, especially by those living in vulnerable situations. A lifecycle analysis showed that from the environmental perspective, UHI mitigation measures that do not require fertilization or maintenance are preferable. Finally, communication efforts that raise awareness of UHI and mitigation are of significant importance to program success.
NASA Astrophysics Data System (ADS)
Bowen, S. R.; Nyflot, M. J.; Herrmann, C.; Groh, C. M.; Meyer, J.; Wollenweber, S. D.; Stearns, C. W.; Kinahan, P. E.; Sandison, G. A.
2015-05-01
Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.
Bowen, S R; Nyflot, M J; Herrmann, C; Groh, C M; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A
2015-05-07
Effective positron emission tomography / computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [(18)F]FDG. The lung lesion insert was driven by six different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses, and 2%-2 mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10-20%, treatment planning errors were 5-10%, and treatment delivery errors were 5-30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5-10% in PET/CT imaging, <5% in treatment planning, and <2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery.
Bowen, S R; Nyflot, M J; Hermann, C; Groh, C; Meyer, J; Wollenweber, S D; Stearns, C W; Kinahan, P E; Sandison, G A
2015-01-01
Effective positron emission tomography/computed tomography (PET/CT) guidance in radiotherapy of lung cancer requires estimation and mitigation of errors due to respiratory motion. An end-to-end workflow was developed to measure patient-specific motion-induced uncertainties in imaging, treatment planning, and radiation delivery with respiratory motion phantoms and dosimeters. A custom torso phantom with inserts mimicking normal lung tissue and lung lesion was filled with [18F]FDG. The lung lesion insert was driven by 6 different patient-specific respiratory patterns or kept stationary. PET/CT images were acquired under motionless ground truth, tidal breathing motion-averaged (3D), and respiratory phase-correlated (4D) conditions. Target volumes were estimated by standardized uptake value (SUV) thresholds that accurately defined the ground-truth lesion volume. Non-uniform dose-painting plans using volumetrically modulated arc therapy (VMAT) were optimized for fixed normal lung and spinal cord objectives and variable PET-based target objectives. Resulting plans were delivered to a cylindrical diode array at rest, in motion on a platform driven by the same respiratory patterns (3D), or motion-compensated by a robotic couch with an infrared camera tracking system (4D). Errors were estimated relative to the static ground truth condition for mean target-to-background (T/Bmean) ratios, target volumes, planned equivalent uniform target doses (EUD), and 2%-2mm gamma delivery passing rates. Relative to motionless ground truth conditions, PET/CT imaging errors were on the order of 10–20%, treatment planning errors were 5–10%, and treatment delivery errors were 5–30% without motion compensation. Errors from residual motion following compensation methods were reduced to 5–10% in PET/CT imaging, < 5% in treatment planning, and < 2% in treatment delivery. We have demonstrated that estimation of respiratory motion uncertainty and its propagation from PET/CT imaging to RT planning, and RT delivery under a dose painting paradigm is feasible within an integrated respiratory motion phantom workflow. For a limited set of cases, the magnitude of errors was comparable during PET/CT imaging and treatment delivery without motion compensation. Errors were moderately mitigated during PET/CT imaging and significantly mitigated during RT delivery with motion compensation. This dynamic motion phantom end-to-end workflow provides a method for quality assurance of 4D PET/CT-guided radiotherapy, including evaluation of respiratory motion compensation methods during imaging and treatment delivery. PMID:25884892
Environmental assessment overview
NASA Technical Reports Server (NTRS)
Valentino, A. R.
1980-01-01
The assessment program has as its objectives: to identify the environmental issues associated with the SPS Reference System; to prepare a preliminary assessment based on existing data; to suggest mitigating strategies and provide environmental data and guidance to other components of the program as required; and to plan long-range research to reduce the uncertainty in the preliminary assessment. The key environmental issues associated with the satellite power system are discussed and include human health and safety, ecosystems, climate, and interaction with electromagnetic systems.
Introduction to LNG vehicle safety
NASA Astrophysics Data System (ADS)
Bratvold, Delma; Friedman, David; Chernoff, Harry; Farkhondehpay, Dariush; Comay, Claudia
1994-03-01
Basic information on the characteristics of liquefied natural gas (LNG) is assembled to provide an overview of safety issues and practices for the use of LNG vehicles. This document is intended for those planning or considering the use of LNG vehicles, including vehicle fleet owners and operators, public transit officials and boards, local fire and safety officials, manufacturers and distributors, and gas industry officials. Safety issues and mitigation measures that should be considered for candidate LNG vehicle projects are addressed.
1987-08-01
conflicts between the facility and local standards, and to evaluate the probability of conflict resulting from any planned expansions. 2-2 Visual Resources...on staffing and housing for the facility itself is contained in Table 2-7. Additional data on the socio - economic background of Ebeye, including...resources, noise, and socio - economics. As a result of that evaluation, consequences vere assigned to one of three categories: insignificant, mitigable, or
Reckien, Diana; Flacke, Johannes; Olazabal, Marta; Heidrich, Oliver
2015-01-01
Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future.
NASA Technical Reports Server (NTRS)
Simon, Donald L.; Rinehart, Aidan W.; Jones, Scott M.
2017-01-01
Aircraft flying in regions of high ice crystal concentrations are susceptible to the buildup of ice within the compression system of their gas turbine engines. This ice buildup can restrict engine airflow and cause an uncommanded loss of thrust, also known as engine rollback, which poses a potential safety hazard. The aviation community is conducting research to understand this phenomena, and to identify avoidance and mitigation strategies to address the concern. To support this research, a dynamic turbofan engine model has been created to enable the development and evaluation of engine icing detection and control-based mitigation strategies. This model captures the dynamic engine response due to high ice water ingestion and the buildup of ice blockage in the engines low pressure compressor. It includes a fuel control system allowing engine closed-loop control effects during engine icing events to be emulated. The model also includes bleed air valve and horsepower extraction actuators that, when modulated, change overall engine operating performance. This system-level model has been developed and compared against test data acquired from an aircraft turbofan engine undergoing engine icing studies in an altitude test facility and also against outputs from the manufacturers customer deck. This paper will describe the model and show results of its dynamic response under open-loop and closed-loop control operating scenarios in the presence of ice blockage buildup compared against engine test cell data. Planned follow-on use of the model for the development and evaluation of icing detection and control-based mitigation strategies will also be discussed. The intent is to combine the model and control mitigation logic with an engine icing risk calculation tool capable of predicting the risk of engine icing based on current operating conditions. Upon detection of an operating region of risk for engine icing events, the control mitigation logic will seek to change the engines operating point to a region of lower risk through the modulation of available control actuators while maintaining the desired engine thrust output. Follow-on work will assess the feasibility and effectiveness of such control-based mitigation strategies.
GLIMPSE – A computational framework for supporting state-level environmental and energy planning
GLIMPSE is an EPA modeling tool for environmental and energy planning used to find U.S. policy scenarios that simultaneously improve air quality, human health, reduce impacts to ecosystems, and mitigate climate change.
Idaho Habitat and Natural Production Monitoring Part I, 1993 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rich, Bruce A.; Petrosky, Charles E.
The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating proposed and existing habitat improvement projects for rainbow-steelhead trout Oncorhynchus mykiss and chinook salmon O. tshawytscha in the Clearwater River and Salmon River drainages on a large scale for the past 8 years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed using increased carrying capacity and/or survival as the best measures ofmore » benefit from a habitat enhancement project. Determination of full benefit from a project depends on completion or maturation of the project and presence of adequate numbers of fish to document actual increases in fish production. The depressed status of upriver anadromous stocks has precluded measuring full benefits of any habitat project in Idaho. Partial benefit is credited to the mitigation record in the interim period of run restoration.« less
Climate mitigation is not the only benefit of a national energy system
NASA Astrophysics Data System (ADS)
Clack, C.
2016-12-01
Many speculate that the main driving force for a continental scale energy system is for climate mitigation. While this is a strong driver, there are multiple co-benefits that emerge from such a transition when purely driven by costs. These components could be managed within a planned system to provide a close-to-optimal solution that enhances the probability of realization. It is shown that these co-benefits of a continental scale electric system occur at costs lower than existing ones. That means there are multiple additional savings without extra costs or effort. The disadvantage is coordination between large geographic regions that could cause more complexity in planning. The main finding from different versions of the NEWS simulator is that carbon mitigation is enhanced by larger systems. In addition, there are increased jobs, reduced water consumption, Sulphur dioxide emissions, Nitrogen oxide emissions, a more distributed electric system and a lower cost of electricity.
Edward B. Butler
2005-01-01
The fires of 2000 and 2002 catalyzed a national mandate for fuel treatment programs to facilitate wildfire mitigation, yet the issues that need to be considered when planning large landscape projects are daunting, often ending in gridlock due to planning conflicts. Hazardous fuels maps help little when planning for integrated, system-wide ecological objectives and fail...
Howell, Lydia Pleotis; Elsbach, Kimberly D; Villablanca, Amparo C
2016-01-01
Work-life balance is important to recruitment and retention of the younger generation of medical faculty, but medical school flexibility policies have not been fully effective. We have reported that our school's policies are underutilized due to faculty concerns about looking uncommitted to career or team. Since policies include leaves and accommodations that reduce physical presence, faculty may fear "face-time bias," which negatively affects evaluation of those not "seen" at work. Face-time bias is reported to negatively affect salary and career progress. We explored face-time bias on a leadership level and described development of compensation criteria intended to mitigate face-time bias, raise visibility, and reward commitment and contribution to team/group goals. Leaders from 6 partner departments participated in standardized interviews and group meetings. Ten compensation plans were analyzed, and published literature was reviewed. Leaders did not perceive face-time issues but saw team pressure and perception of availability as performance motivators. Compensation plans were multifactor productivity based with many quantifiable criteria; few addressed team contributions. Using these findings, novel compensation criteria were developed based on a published model to mitigate face-time bias associated with team perceptions. Criteria for organizational citizenship to raise visibility and reward group outcomes were included. We conclude that team pressure and perception of availability have the potential to lead to bias and may contribute to underuse of flexibility policies. Recognizing organizational citizenship and cooperative effort via specific criteria in a compensation plan may enhance a culture of flexibility. These novel criteria have been effective in one pilot department.
Agolory, Simon G.; Barbot, Oxiris; Averhoff, Francisco; Weiss, Don; Wilson, Elisha; Egger, Joseph; Miller, Jeffery; Ogbuanu, Ikechukwu; Walton, Sabrina; Kahn, Emily
2013-01-01
Introduction Children are important transmitters of influenza in the community and a number of non-pharmaceutical interventions (NPIs), including hand washing and use of hand sanitizer, have been recommended to mitigate the transmission of influenza, but limited information is available regarding schools' ability to implement these NPIs during an influenza outbreak. We evaluated implementation of NPIs during fall 2009 in response to H1N1 pandemic influenza (pH1N1) by New York City (NYC) public schools. Methods From January 25 through February 9, 2010, an online survey was sent to all the 1,632 NYC public schools and principals were asked to participate in the survey or to designate a school nurse or other school official with knowledge of school policies and characteristics to do so. Results Of 1,633 schools, 376(23%) accessed and completed the survey. Nearly all respondents (99%) implemented at least two NPIs. Schools that had a Flu Response Team (FRT) as a part of school emergency preparedness plan were more likely to implement the NPI guidelines recommended by NYC public health officials than schools that did not have a FRT. Designation of a room for isolating ill students, for example, was more common in schools with a FRT (72%) than those without (53%) (p<0.001). Conclusions Implementing an NPI program in a large school system to mitigate the effects of an influenza outbreak is feasible, but there is potential need for additional resources in some schools to increase capacity and adherence to all recommendations. Public health influenza-preparedness plans should include school preparedness planning and FRTs. PMID:23341877
Rodriguez, Fred H; Petersen, John; Selvaratnam, Rajeevan; Mann, Peggy; Hoyne, Jonathan B
2018-03-21
Severe weather events such as hurricanes have the potential to cause significant disruption of laboratory operations. Comprehensive planning is essential to mitigate the impact of such events. The essential elements of a Hurricane Plan, based on our personal experiences, are detailed in this article.
NASA Astrophysics Data System (ADS)
Williams, M. W.; Wireman, M.; Liu, F.; Gertson, J.
2008-12-01
A state of emergency was declared in February 2008 because of fears that a blocked drainage tunnel in the Leadville mining district of Colorado could cause a catastrophic flood. An estimated 1 billion gallons of metals-laden water poses an eminent threat to the city of Leadville and the headwaters of the Arkansas river. Within days of the declaration of a state of emergency, Governor Ritter and Senator Salazer of Colorado, along with a host of other local and statewide politicians, visited the site and emphasized the need to develop a fast yet safe mitigation plan. Here we provide information from a case study that illustrates how a suite of isotopic and hydrologic tools enables identification of critical, site-specific variables essential in developing a science plan to guide targeted remediation of the Leadville drainage tunnel. The isotopic tools, including both stable and radiogenic isotopes, provided clear and compelling evidence of water sources and flowpaths in an area that has undergone extensive perturbations, including the drilling of more than 2,000 mine shafts. This forensic evidence was the key information in developing a plan to plug the drainage tunnel several hundred feet underground, divert a major source of polluted water from reaching the collapsed tunnel and piping it to an existing treatment plant, and guidance on where to place pumps in additional mine shafts, and the drilling of new wells to pump water in case the plugging of the tunnel caused water to pool up and raise the water table to dangerous heights. This particular case of forensic hydrology using isotopic tools not only provides the scientific basis for an operational plan to defuse a life- and property-threatening situation, it also provides the basis for decommissioning an existing water treatment plant, which will result in savings of over 1 million annually in operational costs. Decommissioning the existing water treatment plant will pay for the tunnel mitigation within several years.
Wildlife mitigation and monitoring report Gunnison, Colorado, site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less
Wildfire Mitigation and Private Lands: Managing Long-Term Vulnerabilities
Brian Muller; Stacey Schulte
2006-01-01
Long-term management of wildfire vulnerability requires strategies that address complex interactions between fire ecology and human settlement. In this paper, we examine the integration of wildfire mitigation and land use planning in county governments in the western U.S. This research relies on data from two sources. First, we conducted a survey of land use...
Geoffrey Koch; Alan Ager; Jeff Kline; Paige Fischer
2016-01-01
Effectively addressing wildfire risk to communities on large multi-owner landscapes requires an understanding of the biophysical factors that influence risk, such as fuel loads, topography, and weather, and social factors such as the capacity and willingness for communities to engage in fire-mitigation activities. Biophysical and social processes often are disconnected...
The Influence of Mitigation on Sage-Grouse Habitat Selection within an Energy Development Field
Fedy, Bradley C.; Kirol, Christopher P.; Sutphin, Andrew L.; Maechtle, Thomas L.
2015-01-01
Growing global energy demands ensure the continued growth of energy development. Energy development in wildlife areas can significantly impact wildlife populations. Efforts to mitigate development impacts to wildlife are on-going, but the effectiveness of such efforts is seldom monitored or assessed. Greater sage-grouse (Centrocercus urophasianus) are sensitive to energy development and likely serve as an effective umbrella species for other sagebrush-steppe obligate wildlife. We assessed the response of birds within an energy development area before and after the implementation of mitigation action. Additionally, we quantified changes in habitat distribution and abundance in pre- and post-mitigation landscapes. Sage-grouse avoidance of energy development at large spatial scales is well documented. We limited our research to directly within an energy development field in order to assess the influence of mitigation in close proximity to energy infrastructure. We used nest-location data (n = 488) within an energy development field to develop habitat selection models using logistic regression on data from 4 years of research prior to mitigation and for 4 years following the implementation of extensive mitigation efforts (e.g., decreased activity, buried powerlines). The post-mitigation habitat selection models indicated less avoidance of wells (well density β = 0.18 ± 0.08) than the pre-mitigation models (well density β = -0.09 ± 0.11). However, birds still avoided areas of high well density and nests were not found in areas with greater than 4 wells per km2 and the majority of nests (63%) were located in areas with ≤ 1 well per km2. Several other model coefficients differed between the two time periods and indicated stronger selection for sagebrush (pre-mitigation β = 0.30 ± 0.09; post-mitigation β = 0.82 ± 0.08) and less avoidance of rugged terrain (pre-mitigation β = -0.35 ± 0.12; post-mitigation β = -0.05 ± 0.09). Mitigation efforts implemented may be responsible for the measurable improvement in sage-grouse nesting habitats within the development area. However, we cannot reject alternative hypotheses concerning the influence of population density and intraspecific competition. Additionally, we were unable to assess the actual fitness consequences of mitigation or the source-sink dynamics of the habitats. We compared the pre-mitigation and post-mitigation models predicted as maps with habitats ranked from low to high relative probability of use (equal-area bins: 1 – 5). We found more improvement in habitat rank between the two time periods around mitigated wells compared to non-mitigated wells. Informed mitigation within energy development fields could help improve habitats within the field. We recommend that any mitigation effort include well-informed plans to monitor the effectiveness of the implemented mitigation actions that assess both habitat use and relevant fitness parameters. PMID:25835296
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vitale, Angelo; Roberts, Frank; Peters, Ronald
Throughout the last century, the cumulative effects of anthropogenic disturbances have caused drastic watershed level landscape changes throughout the Reservation and surrounding areas (Coeur d'Alene Tribe 1998). Changes include stream channelization, wetland draining, forest and palouse prairie conversion for agricultural use, high road density, elimination of old growth timber stands, and denuding riparian communities. The significance of these changes is manifested in the degradation of habitats supporting native flora and fauna. Consequently, populations of native fish, wildlife, and plants, which the Tribe relies on as subsistence resources, have declined or in some instances been extirpated (Apperson et al. 1988; Coeurmore » d'Alene Tribe 1998; Lillengreen et al. 1996; Lillengreen et al. 1993; Gerry Green Coeur d'Alene Tribe wildlife Biologist, personal communication 2002). For example, bull trout (Salvelinus confluentus) are not present at detectable levels in Reservation tributaries, westslope cutthroat trout (Oncorhynchus clarki lewisi) are not present in numbers commensurate with maintaining harvestable fisheries (Lillengreen et al. 1993, 1996), and the Sharp-tailed grouse (Tympanuchus phasianellus) are not present at detectable levels on the Reservation (Gerry Green, Coeur d'Alene Tribe wildlife biologist, personal communication). The Coeur d'Alene Tribe added Fisheries and Wildlife Programs to their Natural Resources Department to address these losses and protect important cultural, and subsistence resources for future generations. The Tribal Council adopted by Resolution 89(94), the following mission statement for the Fisheries Program: 'restore, protect, expand and re-establish fish populations to sustainable levels to provide harvest opportunities'. This mission statement, focused on fisheries restoration and rehabilitation, is a response to native fish population declines throughout the Tribe's aboriginal territory, including the Coeur d'Alene Indian Reservation (Coeur d'Alene Tribe 1998). Implicit in this statement is a commitment to provide native subsistence resources in the present and near future as well as the long-term by employing all the mitigation and conservation measures available to them. The development of this Habitat Protection Plan is intended to provide additional planning level guidance as the implementation of conservation measures moves forward. The purpose of this plan is to develop a systematic approach to habitat restoration that will ultimately lead to self-perpetuating, harvestable populations of native fish, wildlife and botanical species. Specifically, it is our intention to apply the principles and analyses presented in this plan to prioritize future restoration efforts that receive funding under the Northwest Power Planning Council's Resident Fish and Wildlife Mitigation Programs. Using an ecosystem restoration approach based on landscape ecology concepts (Primack 1993), the basic premise of the plan is to (1) protect functioning habitat conditions and (2) restore degraded habitat conditions. This plan focuses on habitat conditions at the watershed scale (macrohabitat) rather than on the needs of single species and/or species guilds. By focusing restoration efforts at a macrohabitat level, restoration efforts target all native species inhabiting that area. This approach marks a paradigm shift that emphasizes ecological based restoration rather than species-specific restoration. Traditionally, fish managers and wildlife managers have approached restoration independently, often dedicating resources to a single species by focusing on specific habitat types on a small spatial scale (microhabitat) (Robinson and Bolen 1989, Marcot et al. 2002). This management technique has done little to curb declines despite large budgets (Pianka 1994). Restoration on a landscape level has shown promising results (Holling 1992) and many riparian and wetland restoration projects throughout the northwest have inadvertently improved habitats for non-targeted species. Landscape level restoration addresses the overall habitat condition of the regional area (macrohabitat), restoring the native species composition, density, and diversity by restoring the native ecosystem function. In the context of the development and implementation of this Habitat Protection Plan, it is important to understand that this is primarily a conservation tool, and is not intended to displace efforts that mitigate for lost resources. This plan is intended to primarily address long-term conservation needs and may not accommodate immediate short-term needs that address lost resources. Therefore, areas selected to address short-term mitigation needs may not be located in the high priority areas identified in this Plan. It needs to be clear that these projects and areas are no less important than those identified in this Plan.« less
The Tightrope: French Colonial Collapse and the Shaping of Cold War Europe
2014-06-13
Of what use is strategical planning if the means of carrying it out are not forthcoming? ― General Charles de Gaulle, The Edge of the Sword...also true for some secondary sources that originally published in French. To mitigate the reliance on one or a few translators, I used a wide variety...thesis. Using these resources, the author was able to access a wealth of secondary scholarly sources including books and academic journals as well as
An Online Resource for Flight Test Safety Planning
NASA Technical Reports Server (NTRS)
Lewis, Greg
2007-01-01
A viewgraph presentation describing an online database for flight test safety techniques is shown. The topics include: 1) Goal; 2) Test Hazard Analyses; 3) Online Database Background; 4) Data Gathering; 5) NTPS Role; 6) Organizations; 7) Hazard Titles; 8) FAR Paragraphs; 9) Maneuver Name; 10) Identified Hazard; 11) Matured Hazard Titles; 12) Loss of Control Causes; 13) Mitigations; 14) Database Now Open to the Public; 15) FAR Reference Search; 16) Record Field Search; 17) Keyword Search; and 18) Results of FAR Reference Search.
Risk and the neoliberal state: why post-Mitch lessons didn't reduce El Salvador's earthquake losses.
Wisner, B
2001-09-01
Although El Salvador suffered light losses from Hurricane Mitch in 1998, it benefited from the increased international aid and encouragement for advance planning, especially mitigation and prevention interventions. Thus, one would have supposed, El Salvador would have been in a very advantageous position, able more easily than its economically crippled neighbours, Honduras and Nicaragua, to implement the 'lessons of Mitch'. A review of the recovery plan tabled by the El Salvador government following the earthquakes of early 2001 shows that despite the rhetoric in favour of 'learning the lessons of Mitch', very little mitigation and prevention had actually been put in place between the hurricane (1998) and the earthquakes (2001). The recovery plan is analysed in terms of the degree to which it deals with root causes of disaster vulnerability, namely, the economic and political marginality of much of the population and environmental degradation. An explanation for the failure to implement mitigation and preventive actions is traced to the adherence by the government of El Salvador to an extreme form of neoliberal, free market ideology, and the deep fissures and mistrust in a country that follow a long and bloody civil war.
Managing Research in a Risk World
NASA Technical Reports Server (NTRS)
Anton, W.; Havenhill, M.
2014-01-01
The Office of Chief Medical Officer (OCHMO) owns all human health and performance risks managed by the Human System Risk Board (HSRB). While the HSRB manages the risks, the Human Research Program (HRP) manages the research portion of the overall risk mitigation strategy for these risks. The HSRB manages risks according to a process that identifies and analyzes risks, plans risk mitigation and tracks and reviews the implementation of these strategies according to its decisions pertaining to the OCHMO risk posture. HRP manages risk research work using an architecture that describes evidence-based risks, gaps in our knowledge about characterizing or mitigating the risk, and the tasks needed to produce deliverables to fill the gaps and reduce the risk. A planning schedule reflecting expected research milestones is developed, and as deliverables and new evidence are generated, research progress is tracked via the Path to Risk Reduction (PRR) that reflects a risk's research plan for a design reference mission. HRP's risk research process closely interfaces with the HSRB risk management process. As research progresses, new deliverables and evidence are used by the HSRB in conjunction with other operational and non-research evidence to inform decisions pertaining to the likelihood and consequence of the risk and risk posture. Those decisions in turn guide forward work for research as it contributes to overall risk mitigation strategies. As HRP tracks its research work, it aligns its priorities by assessing the effectiveness of its contributions and maintaining specific core competencies that would be invaluable for future work for exploration missions.
Mitigation planning for raptors during mining
DOE Office of Scientific and Technical Information (OSTI.GOV)
Platt, S.W.; Hargis, N.E.
1990-12-31
Birds of prey and their eggs, young and nests are protected by state and federal laws and regulations. Surface mining operators may experience conflicts with raptors when expanding into nesting areas or when raptors are attracted into mining areas. State and federal permits are required for disturbance or manipulation of birds of prey. Mitigation planning for raptors begins before mining and continues through mining. As conflict situations changes, so must the mitigation plan. Before each nesting season the mining schedule should be compared to areas of known raptor nesting activity. If overlap occurs, nest protection measures may be needed. Areasmore » of potential conflict should be patrolled regularly to identify the presence of a raptor pair and nest starts. Should a raptor nest be built and eggs laid, a change in the mining schedule or an egg or brood manipulation may resolve the conflict. Bridger Coal Company has successfully mitigated conflicts with 3 raptor species. A ferruginous hawk (Buteo regalis) nest with brood was successfully relocated across a pit. Red-tailed hawk (B. jamaicensis) egg clutches were removed from 2 highwall nests and transported in a portable incubator to a commercial raptor propagator where they were hatched, fed and conspecifically imprinted until achieving self-thermoregulation. All chicks were returned to the mine and successfully placed into foster nests. A metal artificial nest ledge for a prairie falcon (Falco mexicanus) was constructed in a cliff and a traditional nesting ledge rendered inaccessible. The falcon pair successfully nested in the artificial ledge.« less
Moses Lake Fishery Restoration Project : FY 1999 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None given
2000-12-01
The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less
Urban flood mitigation planning for Guwahati: A case of Bharalu basin.
Sarmah, Tanaya; Das, Sutapa
2018-01-15
Guwahati, the capital city of Assam and the gateway to the seven north-eastern Indian states, is located in the Brahmaputra valley-one of the most flood prone regions of the world. The city receives an average annual rainfall of 1688 mm and is highly vulnerable towards frequent urban floods because of uncontrolled dumping of solid waste and siltation have choked the natural water channels. This coupled with the absence of an integrated drainage network and rapid urbanisation causes floods in many parts of the city, after a quick downpour. Bharalu river is the main natural water channel of the city and Bharalu basin is the most vulnerable one. The present paper is an attempt to plan for urban flood mitigation, by designing an integrated drainage network for the Bharalu basin which includes the low-lying urbanized areas bordered by the Guwahati-Shillong Road, the Radha Gobindo Baruah Road and the Rajgarh Road. Data regarding land use, flood level, rainfall, urban pattern and vulnerability towards urban flood were collected from available literature, field survey to find highest water level for 11.4 km road stretch, expert opinion survey from 18 experts and feedback from 77 community elders who have been residing in the city since the 1980s. The Bharalu basin is divided into seven drainage blocks and storm run-off has been calculated based on the inputs. Seven different trapezoidal drainage sections were designed to form an integrated drainage network which is 'self-healing' to a certain extent. This can serve as a template for the other catchment basins and to design a drainage network for the entire Guwahati city, thereby reducing urban flood hazard to a significant extent. The study illustrates the necessity of an urban flood mitigation planning approach in sub-Himalayan urban settlements such as Guwahati. Copyright © 2017 Elsevier Ltd. All rights reserved.
Albano, Christine M.; Dettinger, Michael; McCarthy, Maureen; Schaller, Kevin D.; Wellborn, Toby; Cox, Dale A.
2016-01-01
In the Sierra Nevada mountains (USA), and geographically similar areas across the globe where human development is expanding, extreme winter storm and flood risks are expected to increase with changing climate, heightening the need for communities to assess risks and better prepare for such events. In this case study, we demonstrate a novel approach to examining extreme winter storm and flood risks. We incorporated high-resolution atmospheric–hydrologic modeling of the ARkStorm extreme winter storm scenario with multiple modes of engagement with practitioners, including a series of facilitated discussions and a tabletop emergency management exercise, to develop a regional assessment of extreme storm vulnerabilities, mitigation options, and science needs in the greater Lake Tahoe region of Northern Nevada and California, USA. Through this process, practitioners discussed issues of concern across all phases of the emergency management life cycle, including preparation, response, recovery, and mitigation. Interruption of transportation, communications, and interagency coordination were among the most pressing concerns, and specific approaches for addressing these issues were identified, including prepositioning resources, diversifying communications systems, and improving coordination among state, tribal, and public utility practitioners. Science needs included expanding real-time monitoring capabilities to improve the precision of meteorological models and enhance situational awareness, assessing vulnerabilities of critical infrastructure, and conducting cost–benefit analyses to assess opportunities to improve both natural and human-made infrastructure to better withstand extreme storms. Our approach and results can be used to support both land use and emergency planning activities aimed toward increasing community resilience to extreme winter storm hazards in mountainous regions.
Neri, Antonio; Stewart, Sherri L; Angell, William
2013-08-08
Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. We reviewed 65 cancer plans created from 2005 through 2011 for the terms "radon," "radiation," or "lung." Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program's most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n=21), remediation (n=11), support radon policy activities (n=13), and policy evaluation (n=1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n=21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs.
Population growth is a variable open to change
NASA Astrophysics Data System (ADS)
Potts, M.
2016-12-01
The absolute number of people and the rate of population growth have an impact on climate mitigation, adaptation and possible conflict. Half the pregnancies in the US are unintended. Robust quantitative evidence from California demonstrates that improving access to family planning is the single most cost-effective way of mitigating our carbon footprint. Globally, there are 80 million unintended pregnancies annually. Many non-evidence barriers deprive women of the information and means required to separate sex from childbearing. Between 1960 and 1990, meeting the need for family planning led to a rapid fall in family size in much of Asia. Since 1990, funding for family planning has collapsed and fertility decline has stalled. The UN projects that by 2100 global population will increase by 3.8 billion (equal to world population in 1975). 80% of this growth will be in Africa. Studies project that climate change will undermine crop yields in parts of Africa, especially the Sahel. A high ratio of young males to the rest of the population is a risk factor in conflict. Today, only 1% of overseas assistance is allocated to family planning. Based on analysis of the past, doubling that investment would accelerate fertility decline, facilitating climate mitigation and adaptation, and possibly reducing conflict. Population and family planning were pushed off the international agenda by unacceptably and tragic episodes of coercion in China and India. However, there is compelling data that when voluntary family planning is widely available then family size can fall rapidly, as occurred in the Islamic Republic of Iran, where fertility fell more rapidly than in any other country in history. Family planning is listening to what women want not telling people want to do. Population growth is a variable open to change in a human rights framework. Population and family planning are variables relevant to the scientific agenda of the AGU.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
...This final rule approves state implementation plan (SIP) revisions submitted by the State of California on June 15, 2004 and February 3, 2009, relating to reformulated gasoline (RFG) and diesel fuel sold or supplied as motor vehicle fuels in California. The revisions relating to RFG include California Phase 3 RFG (CaRFG3) regulations, correction of errors and streamlined requirements for compliance with and enforcement of the CaRFG3 standards, and an update to the State's predictive model to mitigate permeation emissions associated with the use of ethanol as a fuel additive. The revisions relating to diesel fuel include test methods for determining the aromatic hydrocarbon content in diesel fuel and reductions in the maximum allowable sulfur content for motor vehicle diesel fuel. The effect of today's action is to make these revisions federally enforceable as part of the California SIP.
High-Penetration Photovoltaic Planning Methodologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gao, David Wenzhong; Muljadi, Eduard; Tian, Tian
The main objective of this report is to provide an overview of select U.S. utility methodologies for performing high-penetration photovoltaic (HPPV) system planning and impact studies. This report covers the Federal Energy Regulatory Commission's orders related to photovoltaic (PV) power system interconnection, particularly the interconnection processes for the Large Generation Interconnection Procedures and Small Generation Interconnection Procedures. In addition, it includes U.S. state interconnection standards and procedures. The procedures used by these regulatory bodies consider the impacts of HPPV power plants on the networks. Technical interconnection requirements for HPPV voltage regulation include aspects of power monitoring, grounding, synchronization, connection tomore » the overall distribution system, back-feeds, disconnecting means, abnormal operating conditions, and power quality. This report provides a summary of mitigation strategies to minimize the impact of HPPV. Recommendations and revisions to the standards may take place as the penetration level of renewables on the grid increases and new technologies develop in future years.« less
A multi-period optimization model for energy planning with CO(2) emission consideration.
Mirzaesmaeeli, H; Elkamel, A; Douglas, P L; Croiset, E; Gupta, M
2010-05-01
A novel deterministic multi-period mixed-integer linear programming (MILP) model for the power generation planning of electric systems is described and evaluated in this paper. The model is developed with the objective of determining the optimal mix of energy supply sources and pollutant mitigation options that meet a specified electricity demand and CO(2) emission targets at minimum cost. Several time-dependent parameters are included in the model formulation; they include forecasted energy demand, fuel price variability, construction lead time, conservation initiatives, and increase in fixed operational and maintenance costs over time. The developed model is applied to two case studies. The objective of the case studies is to examine the economical, structural, and environmental effects that would result if the electricity sector was required to reduce its CO(2) emissions to a specified limit. Copyright 2009 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Petrosky, Charles E.; Holubetz, Terry B.
The Idaho Department of Fish and Game has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead (Salmo gairdneri) and chinook salmon (Oncorhynchus tshawytscha) in the Clearwater and Salmon River drainages over the last four years. Projects included in the evaluation are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia rivers. A mitigation record is being developed to use increased smolt production at full seeding as the best measure of benefit from a habitat enhancementmore » project. Determination of full benefit from a project depends on presence of adequate numbers of fish to document actual increases in fish production. The depressed nature of upriver anadromous stocks have precluded attainment of full benefit of any habitat project in Idaho. Partial benefit will be credited to the mitigation record in the interim period of run restoration. According to the BPA Work Plan, project implementors have the primary responsibility for measuring physical habitat and estimating habitat change. To date, Idaho habitat projects have been implemented primarily by the US Forest Service (USFS). The Shoshone-Bannock Tribes (SBT) have sponsored three projects (Bear Valley Mine, Yankee Fork, and the proposed East Fork Salmon River projects). IDFG implemented two barrier-removal projects (Johnson Creek and Boulder Creek) that the USFS was unable to sponsor at that time. The role of IDFG in physical habitat monitoring is primarily to link habitat quality and habitat change to changes in actual, or potential, fish production. Individual papers were processed separately for the data base.« less
Asare, Rebecca A; Kyei, Andrew; Mason, John J
2013-01-01
Climate change poses a significant threat to Africa, and deforestation rates have increased in recent years. Mitigation initiatives such as REDD+ are widely considered as potentially efficient ways to generate emission reductions (or removals), conserve or sustainably manage forests, and bring benefits to communities, but effective implementation models are lacking. This paper presents the case of Ghana's Community Resource Management Area (CREMA) mechanism, an innovative natural resource governance and landscape-level planning tool that authorizes communities to manage their natural resources for economic and livelihood benefits. This paper argues that while the CREMA was originally developed to facilitate community-based wildlife management and habitat protection, it offers a promising community-based structure and process for managing African forest resources for REDD+. At a theoretical level, it conforms to the ecological, socio-cultural and economic factors that drive resource-users' decision process and practices. And from a practical mitigation standpoint, the CREMA has the potential to help solve many of the key challenges for REDD+ in Africa, including definition of boundaries, smallholder aggregation, free prior and informed consent, ensuring permanence, preventing leakage, clarifying land tenure and carbon rights, as well as enabling equitable benefit-sharing arrangements. Ultimately, CREMA's potential as a forest management and climate change mitigation strategy that generates livelihood benefits for smallholder farmers and forest users will depend upon the willingness of African governments to support the mechanism and give it full legislative backing, and the motivation of communities to adopt the CREMA and integrate democratic decision-making and planning with their traditional values and natural resource management systems.
Asare, Rebecca A.; Kyei, Andrew; Mason, John J.
2013-01-01
Climate change poses a significant threat to Africa, and deforestation rates have increased in recent years. Mitigation initiatives such as REDD+ are widely considered as potentially efficient ways to generate emission reductions (or removals), conserve or sustainably manage forests, and bring benefits to communities, but effective implementation models are lacking. This paper presents the case of Ghana's Community Resource Management Area (CREMA) mechanism, an innovative natural resource governance and landscape-level planning tool that authorizes communities to manage their natural resources for economic and livelihood benefits. This paper argues that while the CREMA was originally developed to facilitate community-based wildlife management and habitat protection, it offers a promising community-based structure and process for managing African forest resources for REDD+. At a theoretical level, it conforms to the ecological, socio-cultural and economic factors that drive resource-users’ decision process and practices. And from a practical mitigation standpoint, the CREMA has the potential to help solve many of the key challenges for REDD+ in Africa, including definition of boundaries, smallholder aggregation, free prior and informed consent, ensuring permanence, preventing leakage, clarifying land tenure and carbon rights, as well as enabling equitable benefit-sharing arrangements. Ultimately, CREMA's potential as a forest management and climate change mitigation strategy that generates livelihood benefits for smallholder farmers and forest users will depend upon the willingness of African governments to support the mechanism and give it full legislative backing, and the motivation of communities to adopt the CREMA and integrate democratic decision-making and planning with their traditional values and natural resource management systems. PMID:23878338
Public Participation, Education, and Engagement in Drought Planning
NASA Astrophysics Data System (ADS)
Bathke, D. J.; Wall, N.; Haigh, T.; Smith, K. H.; Bernadt, T.
2014-12-01
Drought is a complex problem that typically goes beyond the capacity, resources, and jurisdiction of any single person, program, organization, political boundary, or sector. Thus, by nature, monitoring, planning for, and reducing drought risk must be a collaborative process. The National Drought Mitigation Center, in partnership with the National Integrated Drought Information System (NIDIS) Program Office and others, provides active engagement and education drought professionals, stakeholders, and the general public about managing drought-related risks through resilience planning, monitoring, and education. Using case studies, we discuss recruitment processes, network building, participation techniques, and educational methods as they pertain to a variety of unique audiences with distinct objectives. Examples include collaborative decision-making at a World Meteorological Organization conference; planning, and peer-learning among drought professionals in a community of practice; drought condition monitoring through citizen science networks; research and education dissemination with stakeholder groups; and informal learning activities for all ages. Finally, we conclude with evaluation methods, indicators of success, and lessons learned for increasing the effectiveness of our programs in increasing drought resilience.
Is climate change modifying precipitation extremes?
NASA Astrophysics Data System (ADS)
Montanari, Alberto; Papalexiou, Simon Michael
2016-04-01
The title of the present contribution is a relevant question that is frequently posed to scientists, technicians and managers of local authorities. Although several research efforts were recently dedicated to rainfall observation, analysis and modelling, the above question remains essentially unanswered. The question comes from the awareness that the frequency of floods and the related socio-economic impacts are increasing in many countries, and climate change is deemed to be the main trigger. Indeed, identifying the real reasons for the observed increase of flood risk is necessary in order to plan effective mitigation and adaptation strategies. While mitigation of climate change is an extremely important issue at the global level, at small spatial scales several other triggers may interact with it, therefore requiring different mitigation strategies. Similarly, the responsibilities of administrators are radically different at local and global scales. This talk aims to provide insights and information to address the question expressed by its title. High resolution and long term rainfall data will be presented, as well as an analysis of the frequency of their extremes and its progress in time. The results will provide pragmatic indications for the sake of better planning flood risk mitigation policies.
Reckien, Diana; Flacke, Johannes
2015-01-01
Cities are recognised as key players in global adaptation and mitigation efforts because the majority of people live in cities. However, in Europe, which is highly urbanized and one of the most advanced regions in terms of environmental policies, there is considerable diversity in the regional distribution, ambition and scope of climate change responses. This paper explores potential factors contributing to such diversity in 200 large and medium-sized cities across 11 European countries. We statistically investigate institutional, socio-economic, environmental and vulnerability characteristics of cities as potential drivers of or barriers to the development of urban climate change plans. Our results show that factors such as membership of climate networks, population size, GDP per capita and adaptive capacity act as drivers of mitigation and adaptation plans. By contrast, factors such as the unemployment rate, warmer summers, proximity to the coast and projected exposure to future climate impacts act as barriers. We see that, overall, it is predominantly large and prosperous cities that engage in climate planning, while vulnerable cities and those at risk of severe climate impacts in the future are less active. Our analysis suggests that climate change planning in European cities is not proactive, i.e. not significantly influenced by anticipated future impacts. Instead, we found that the current adaptive capacity of a city significantly relates to climate planning. Along with the need to further explore these relations, we see a need for more economic and institutional support for smaller and less resourceful cities and those at high risk from climate change impacts in the future. PMID:26317420
NASA Astrophysics Data System (ADS)
Muhammad, Ario; Goda, Katsuichiro; Alexander, Nicholas A.; Kongko, Widjo; Muhari, Abdul
2017-12-01
This study develops tsunami evacuation plans in Padang, Indonesia, using a stochastic tsunami simulation method. The stochastic results are based on multiple earthquake scenarios for different magnitudes (Mw 8.5, 8.75, and 9.0) that reflect asperity characteristics of the 1797 historical event in the same region. The generation of the earthquake scenarios involves probabilistic models of earthquake source parameters and stochastic synthesis of earthquake slip distributions. In total, 300 source models are generated to produce comprehensive tsunami evacuation plans in Padang. The tsunami hazard assessment results show that Padang may face significant tsunamis causing the maximum tsunami inundation height and depth of 15 and 10 m, respectively. A comprehensive tsunami evacuation plan - including horizontal evacuation area maps, assessment of temporary shelters considering the impact due to ground shaking and tsunami, and integrated horizontal-vertical evacuation time maps - has been developed based on the stochastic tsunami simulation results. The developed evacuation plans highlight that comprehensive mitigation policies can be produced from the stochastic tsunami simulation for future tsunamigenic events.
Environmental Development Plan (EDP). Enhanced gas recovery, FY 1977
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-03-01
This Enhanced Gcs Recovery EDP addresses the environmental impacts of enhanced gas recovery processes in shale and sandstone, methane drainage from coalbeds, and methane recovery from geopressured aquifers. The EDP addresses planning in two basic areas: environmental research and environmental assessment. Environmental research can be categorized as follows: characterization of pollutants from EGR processes; selective application of monitoring and measuring techniques; evaluation of control/mitigation techniques; and evaluation of the synergistic impacts of the development of EGR techniques. Environmental assessment activities scheduled by EDP include: assessment of ecological impacts; assessment of socioeconomic effects; EIA/EIS preparation; evaluation of control technology needs; andmore » analysis of applicable and proposed emission, effluent, and health and safety standards. The EGR EDP includes an EGR technology overview (Section 2), a discussion of EGR environmental issues and requirements (Section 3), an environmental action plan (Section 4), an environmental management strategy for the EGR program (Section 5), and supporting appendices which present information on Federal legislation applicable to EGR technology, a summary of ongoing and completed research, and future research and assessment projects.« less
LaFontaine, Jacob H.; Hay, Lauren E.; Viger, Roland; Regan, R. Steve; Markstrom, Steven
2015-01-01
The hydrologic response to statistically downscaled general circulation model simulations of daily surface climate and land cover through 2099 was assessed for the Apalachicola-Chattahoochee-Flint River Basin located in the southeastern United States. Projections of climate, urbanization, vegetation, and surface-depression storage capacity were used as inputs to the Precipitation-Runoff Modeling System to simulate projected impacts on hydrologic response. Surface runoff substantially increased when land cover change was applied. However, once the surface depression storage was added to mitigate the land cover change and increases of surface runoff (due to urbanization), the groundwater flow component then increased. For hydrologic studies that include projections of land cover change (urbanization in particular), any analysis of runoff beyond the change in total runoff should include effects of stormwater management practices as these features affect flow timing and magnitude and may be useful in mitigating land cover change impacts on streamflow. Potential changes in water availability and how biota may respond to changes in flow regime in response to climate and land cover change may prove challenging for managers attempting to balance the needs of future development and the environment. However, these models are still useful for assessing the relative impacts of climate and land cover change and for evaluating tradeoffs when managing to mitigate different stressors.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-12
...FRA is amending its hours of service recordkeeping regulations, to add substantive hours of service regulations, including maximum on-duty periods, minimum off-duty periods, and other limitations, for train employees (e.g., locomotive engineers and conductors) providing commuter and intercity rail passenger transportation. The new substantive regulations require that railroads employing such train employees analyze and mitigate the risks for fatigue in the schedules worked by these train employees, and that the railroads submit to FRA for its approval the relevant schedules and fatigue mitigation plans. This final rule also makes corresponding changes to FRA's hours of service recordkeeping regulation, to require railroads to keep hours of service records and report excess service to FRA in a manner consistent with the new substantive requirements. This regulation is authorized by the Rail Safety Improvement Act of 2008.
Perez, L; Trüeb, S; Cowie, H; Keuken, M P; Mudu, P; Ragettli, M S; Sarigiannis, D A; Tobollik, M; Tuomisto, J; Vienneau, D; Sabel, C; Künzli, N
2015-12-01
Local strategies to reduce green-house gases (GHG) imply changes of non-climatic exposure patterns. To assess the health impacts of locally relevant transport-related climate change policies in Basel, Switzerland. We modelled change in mortality and morbidity for the year 2020 based on several locally relevant transport scenarios including all decided transport policies up to 2020, additional realistic and hypothesized traffic reductions, as well as ambitious diffusion levels of electric cars. The scenarios were compared to the reference condition in 2010 assumed as status quo. The changes in non-climatic population exposure included ambient air pollution, physical activity, and noise. As secondary outcome, changes in Disability-Adjusted Life Years (DALYs) were put into perspective with predicted changes of CO2 emissions and fuel consumption. Under the scenario that assumed a strict particle emissions standard in diesel cars and all planned transport measures, 3% of premature deaths could be prevented from projected PM2.5 exposure reduction. A traffic reduction scenario assuming more active trips provided only minor added health benefits for any of the changes in exposure considered. A hypothetical strong support to electric vehicles diffusion would have the largest health effectiveness given that the energy production in Basel comes from renewable sources. The planned local transport related GHG emission reduction policies in Basel are sensible for mitigating climate change and improving public health. In this context, the most effective policy remains increasing zero-emission vehicles. Copyright © 2015 Elsevier Ltd. All rights reserved.
44 CFR 201.7 - Tribal Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... events. (ii) A description of the Indian tribal government's vulnerability to the hazards described in... its impact on the tribe. The plan should describe vulnerability in terms of: (A) The types and numbers... or avoid long-term vulnerabilities to the identified hazards. (ii) A section that identifies and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... transportation conformity revisions to the Kentucky State Implementation Plan (SIP) submitted by the Commonwealth...). This addition consists of transportation conformity criteria and procedures related to interagency consultation and enforceability of certain transportation-related control measures and mitigation measures. The...
75 FR 66319 - State Systems Advance Planning Document (APD) Process
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
...) equipment and services. The APD process was designed to mitigate financial risks, avoid incompatibilities... develop a General Systems Design (GSD). Implementation APD means a recorded plan of action to request Federal financial participation (FFP) in the costs of designing, developing and implementing the system...
Jiang, Dong; Hao, Mengmeng; Fu, Jingying; Tian, Guangjin; Ding, Fangyu
2017-09-14
Global warming and increasing concentration of atmospheric greenhouse gas (GHG) have prompted considerable interest in the potential role of energy plant biomass. Cassava-based fuel ethanol is one of the most important bioenergy and has attracted much attention in both developed and developing countries. However, the development of cassava-based fuel ethanol is still faced with many uncertainties, including raw material supply, net energy potential, and carbon emission mitigation potential. Thus, an accurate estimation of these issues is urgently needed. This study provides an approach to estimate energy saving and carbon emission mitigation potentials of cassava-based fuel ethanol through LCA (life cycle assessment) coupled with a biogeochemical process model-GEPIC (GIS-based environmental policy integrated climate) model. The results indicate that the total potential of cassava yield on marginal land in China is 52.51 million t; the energy ratio value varies from 0.07 to 1.44, and the net energy surplus of cassava-based fuel ethanol in China is 92,920.58 million MJ. The total carbon emission mitigation from cassava-based fuel ethanol in China is 4593.89 million kgC. Guangxi, Guangdong, and Fujian are identified as target regions for large-scale development of cassava-based fuel ethanol industry. These results can provide an operational approach and fundamental data for scientific research and energy planning.
NASA Astrophysics Data System (ADS)
Jiang, Dong; Hao, Mengmeng; Fu, Jingying; Tian, Guangjin; Ding, Fangyu
2017-09-01
Global warming and increasing concentration of atmospheric greenhouse gas (GHG) have prompted considerable interest in the potential role of energy plant biomass. Cassava-based fuel ethanol is one of the most important bioenergy and has attracted much attention in both developed and developing countries. However, the development of cassava-based fuel ethanol is still faced with many uncertainties, including raw material supply, net energy potential, and carbon emission mitigation potential. Thus, an accurate estimation of these issues is urgently needed. This study provides an approach to estimate energy saving and carbon emission mitigation potentials of cassava-based fuel ethanol through LCA (life cycle assessment) coupled with a biogeochemical process model—GEPIC (GIS-based environmental policy integrated climate) model. The results indicate that the total potential of cassava yield on marginal land in China is 52.51 million t; the energy ratio value varies from 0.07 to 1.44, and the net energy surplus of cassava-based fuel ethanol in China is 92,920.58 million MJ. The total carbon emission mitigation from cassava-based fuel ethanol in China is 4593.89 million kgC. Guangxi, Guangdong, and Fujian are identified as target regions for large-scale development of cassava-based fuel ethanol industry. These results can provide an operational approach and fundamental data for scientific research and energy planning.
NASA Astrophysics Data System (ADS)
Prenger-Berninghoff, Kathrin; Cortes, V. Juliette; Aye, Zar Chi; Sprague, Teresa
2013-04-01
The management of natural hazards involves, as generally known, the four stages of the risk management cycle: Prevention, preparedness, response and recovery. Accordingly, the mitigation of disasters can be performed in terms of short-term and long-term purposes. Whereas emergency management or civil protection helps to strengthen a community's capacity to be better prepared for natural hazards and to better respond in case a disaster strikes, thus addressing the short-term perspective, spatial planning serves long-term planning goals and can therefore implement long-term prevention measures. A purposefully applied risk mitigation strategy requires coordination of short-term and long-term mitigation measures and thus an effective coordination of emergency management and spatial planning. Several actors are involved in risk management and should consequently be linked throughout the whole risk management cycle. However, these actors, partly because of a historically fragmented administrative system, are hardly connected to each other, with spatial planning only having a negligible role compared to other actors1, a problem to which Young (2002) referred to as the "problem of interplay". In contrast, information transfer and decision-taking happen at the same time and are not coordinated among different actors. This applies to the prevention and preparedness phase as well as to the recovery phase, which basically constitutes the prevention phase for the next disaster2. Since investments in both risk prevention and emergency preparedness and response are considered necessary, a better coordination of the two approaches is required. In this regard, Decision Support Systems (DSS) can be useful in order to provide support in the decision-making aspect of risk management. The research work currently undertaken examines the problem of interplay in the four case study areas of the Marie Curie ITN, CHANGES3. The link between different risk management actors will be explored by means of exploratory questionnaires and interviews with government agencies, local administrations, community and research organizations on each study site. First results provided will address the general role of spatial planning in risk management. Additionally, preliminary observations are made in regard to the coordination of emergency preparedness and long-term spatial planning activities. The observations consider that integration facilitates proactive strategies that aim at preventing disaster occurrence and promote interaction between involved parties. Finally, consideration is given to the potential use of a DSS tool to cover both aspects of spatial planning and emergency management in the risk management cycle.
Advances in 4D Treatment Planning for Scanned Particle Beam Therapy — Report of Dedicated Workshops
Bert, Christoph; Graeff, Christian; Riboldi, Marco; Nill, Simeon; Baroni, Guido; Knopf, Antje-Christin
2014-01-01
We report on recent progress in the field of mobile tumor treatment with scanned particle beams, as discussed in the latest editions of the 4D treatment planning workshop. The workshop series started in 2009, with about 20 people from 4 research institutes involved, all actively working on particle therapy delivery and development. The first workshop resulted in a summary of recommendations for the treatment of mobile targets, along with a list of requirements to apply these guidelines clinically. The increased interest in the treatment of mobile tumors led to a continuously growing number of attendees: the 2012 edition counted more than 60 participants from 20 institutions and commercial vendors. The focus of research discussions among workshop participants progressively moved from 4D treatment planning to complete 4D treatments, aiming at effective and safe treatment delivery. Current research perspectives on 4D treatments include all critical aspects of time resolved delivery, such as in-room imaging, motion detection, beam application, and quality assurance techniques. This was motivated by the start of first clinical treatments of hepato cellular tumors with a scanned particle beam, relying on gating or abdominal compression for motion mitigation. Up to date research activities emphasize significant efforts in investigating advanced motion mitigation techniques, with a specific interest in the development of dedicated tools for experimental validation. Potential improvements will be made possible in the near future through 4D optimized treatment plans that require upgrades of the currently established therapy control systems for time resolved delivery. But since also these novel optimization techniques rely on the validity of the 4DCT, research focusing on alternative 4D imaging technique, such as MRI based 4DCT generation will continue. PMID:24354749
Effectiveness of damped braces to mitigate seismic torsional response of unsymmetric-plan buildings
NASA Astrophysics Data System (ADS)
Mazza, Fabio; Pedace, Emilia; Favero, Francesco Del
2017-02-01
The seismic retrofitting of unsymmetric-plan reinforced concrete (r.c.) framed buildings can be carried out by the incorporation of damped braces (DBs). Yet most of the proposals to mitigate the seismic response of asymmetric framed buildings by DBs rest on the hypothesis of elastic (linear) structural response. The aim of the present work is to evaluate the effectiveness and reliability of a Displacement-Based Design procedure of hysteretic damped braces (HYDBs) based on the nonlinear behavior of the frame members, which adopts the extended N2 method considered by Eurocode 8 to evaluate the higher mode torsional effects. The Town Hall of Spilinga (Italy), a framed structure with an L-shaped plan built at the beginning of the 1960s, is supposed to be retrofitted with HYDBs to attain performance levels imposed by the Italian seismic code (NTC08) in a high-risk zone. Ten structural solutions are compared by considering two in-plan distributions of the HYDBs, to eliminate (elastic) torsional effects, and different design values of the frame ductility combined with a constant design value of the damper ductility. A computer code for the nonlinear dynamic analysis of r.c. spatial framed structures is adopted to evaluate the critical incident angle of bidirectional earthquakes. Beams and columns are simulated with a lumped plasticity model, including flat surface modeling of the axial load-biaxial bending moment elastic domain at the end sections, while a bilinear law is used to idealize the behavior of the HYDBs. Damage index domains are adopted to estimate the directions of least seismic capacity, considering artificial earthquakes whose response spectra match those adopted by NTC08 at serviceability and ultimate limit states.
Exploring Crisis Management in U.S. Small Businesses
NASA Astrophysics Data System (ADS)
Williams, Jon
As a critical infrastructure, the US electricity grid supplies electricity to 340 million people within eight separate regions. The power infrastructure is vulnerable to many types of disasters capable of severing supplies of electricity. The impact on the employees and communities when small- and medium-size enterprises are shut down due to disasters can be severe. The purpose of the quantitative comparative study was to explore small- and medium-size enterprises crisis management strategies in the case of power infrastructure vulnerabilities. Perceptions of small business leaders were probed about crisis management planning relevant to three secondary factors: prior experience of crises, threat perceptions, and planning self-efficacy. Participants completed an adapted questionnaire instrument based on a five-point Likert scale for six sub-factors including resilience through planning, financial impact, operational crisis management, the perfect storm, the aftermath of survival, and atrophy. The instrument also measured three additional factors to include, prior experience of crises, threat perceptions, and planning self-efficacy, across seven types of crises. The results of this study indicated that of the 276 respondents, 104 had no crisis plans, but 172 did have crisis plans. Of those who had implemented crisis plans, 19% had specific provisions to address power outages or attacks on the electrical grid. Of the respondents who had not planned for power outages nor experienced significant losses of power, a statistically significant number acknowledged an external threat to their business. The majority of respondents indicated that long-term planning was related to resilience; however, the migration of crisis understanding into the planning process or implementation was not implemented. This heightened awareness of potential crises without the corresponding development and implementation of mitigation crisis plans requires additional research to understand drivers effecting the decision making process with crisis managers.
Geologic process studies using Synthetic Aperture Radar (SAR) data
NASA Technical Reports Server (NTRS)
Evans, Diane L.
1992-01-01
The use of SAR data to study geologic processes for better understanding of recent tectonic activity and climate change as well as the mitigation of geologic hazards and exploration for nonrenewable resources is discussed. The geologic processes that are particularly amenable to SAR-based data include volcanism; soil erosion, degradation, and redistribution; coastal erosion and inundation; glacier fluctuations; permafrost; and crustal motions. When SAR data are combined with data from other planned spaceborne sensors including ESA ERS, the Japanese Earth Resources Satellite, and the Canadian Radarsat, it will be possible to build a time-series view of temporal changes over many regions of earth.
Assessment of the State-of-the-Art in the Design and Manufacturing of Large Composite Structure
NASA Technical Reports Server (NTRS)
Harris, C. E.
2001-01-01
This viewgraph presentation gives an assessment of the state-of-the-art in the design and manufacturing of large component structures, including details on the use of continuous fiber reinforced polymer matrix composites (CFRP) in commercial and military aircraft and in space launch vehicles. Project risk mitigation plans must include a building-block test approach to structural design development, manufacturing process scale-up development tests, and pre-flight ground tests to verify structural integrity. The potential benefits of composite structures justifies NASA's investment in developing the technology. Advanced composite structures technology is enabling to virtually every Aero-Space Technology Enterprise Goal.
Preparing for International Travel and Global Medical Care.
Mahadevan, Swaminatha V; Strehlow, Matthew C
2017-05-01
Thorough pretravel preparation and medical consultation can mitigate avoidable health and safety risks. A comprehensive pretravel medical consultation should include an individualized risk assessment, immunization review, and discussion of arthropod protective measures, malaria prophylaxis, traveler's diarrhea, and injury prevention. Travel with children and jet lag reduction require additional planning and prevention strategies; travel and evacuation insurance may prove essential when traveling to less resourced countries. Consideration should also be given to other high-risk travel scenarios, including the provision of health care overseas, adventure and extreme sports, water environments and diving, high altitude, and terrorism/unstable political situations. Copyright © 2017 Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Bianchizza, C.; Del Bianco, D.; Pellizzoni, L.; Scolobig, A.
2012-04-01
Flood risk mitigation decisions pose key challenges not only from a technical but also from a social, economic and political viewpoint. There is an increasing demand for improving the quality of these processes by including different stakeholders - and especially by involving the local residents in the decision making process - and by guaranteeing the actual improvement of local social capacities during and after the decision making. In this paper we analyse two case studies of flood risk mitigation decisions, Malborghetto-Valbruna and Vipiteno-Sterzing, in the Italian Alps. In both of them, mitigation works have been completed or planned, yet following completely different approaches especially in terms of responses of residents and involvement of local authorities. In Malborghetto-Valbruna an 'interventionist' approach (i.e. leaning towards a top down/technocratic decision process) was used to make decisions after the flood event that affected the municipality in the year 2003. In Vipiteno-Sterzing, a 'participatory' approach (i.e. leaning towards a bottom-up/inclusive decision process) was applied: decisions about risk mitigation measures were made by submitting different projects to the local citizens and by involving them in the decision making process. The analysis of the two case studies presented in the paper is grounded on the results of two research projects. Structured and in-depth interviews, as well as questionnaire surveys were used to explore residents' and local authorities' orientations toward flood risk mitigation. Also a SWOT analysis (Strengths, Weaknesses, Opportunities and Threats) involving key stakeholders was used to better understand the characteristics of the communities and their perception of flood risk mitigation issues. The results highlight some key differences between interventionist and participatory approaches, together with some implications of their adoption in the local context. Strengths and weaknesses of the two approaches, as well as key challenges for the future are also discussed.
Strategy for Mitigating Collision Between Landsat-5 and the Afternoon Constellation
NASA Technical Reports Server (NTRS)
Levi, Joshua A.; Palmer, Eric J.
2011-01-01
The NASA Goddard Space Flight Center Earth Science Mission Operations project, the French space agency Centre National d tudes Spatiales, the Argentinian space agency Comisi n Nacional de Actividades Espaciales, and the United States Geological Survey all operate spacecraft in sun-synchronous frozen orbits. The orbits are planned to not place any of the spacecraft at risk of colliding with another. However, evolution of these orbits over time has com-promised the safe interaction between Landsat-5 and the Afternoon Constella-tion. This paper analyzes the interactions between the Landsat-5 spacecraft and the Afternoon Constellation members over a period of 6 years, describing the current risk and plan to mitigate collisions in the future.
A method for estimating cost savings for population health management programs.
Murphy, Shannon M E; McGready, John; Griswold, Michael E; Sylvia, Martha L
2013-04-01
To develop a quasi-experimental method for estimating Population Health Management (PHM) program savings that mitigates common sources of confounding, supports regular updates for continued program monitoring, and estimates model precision. Administrative, program, and claims records from January 2005 through June 2009. Data are aggregated by member and month. Study participants include chronically ill adult commercial health plan members. The intervention group consists of members currently enrolled in PHM, stratified by intensity level. Comparison groups include (1) members never enrolled, and (2) PHM participants not currently enrolled. Mixed model smoothing is employed to regress monthly medical costs on time (in months), a history of PHM enrollment, and monthly program enrollment by intensity level. Comparison group trends are used to estimate expected costs for intervention members. Savings are realized when PHM participants' costs are lower than expected. This method mitigates many of the limitations faced using traditional pre-post models for estimating PHM savings in an observational setting, supports replication for ongoing monitoring, and performs basic statistical inference. This method provides payers with a confident basis for making investment decisions. © Health Research and Educational Trust.
Impact of Risk Perception on Risk Communication and Community Resilience Enhancement
NASA Astrophysics Data System (ADS)
Frazier, T. G.; Thompson, C. M.
2014-12-01
Past studies have demonstrated there is a relationship between risk perception, risk tolerance and mitigation planning. When people experience high-risk perception, their risk tolerance is typically lowered causing them to become more likely to support the implementation of mitigation policies including those that are either cost intensive or politically controversial. Understanding stakeholder risk perception could therefore provide information about the likelihood of implementation of various mitigation strategies. Varied risk communication methods are needed to accurately represent community risk so as to better inform decision-making. In response to this need, this research examines the effect of risk perception on community resilience through a case study of Fernan Lake, ID. Researchers conducted a survey of Fernan Lake residents to determine their risk perception of the impact of blue-green algae blooms on community resilience. Survey questions were developed based on traditional risk perception factors like vested interest, social trust, knowledge, possible benefits or losses, relevance to individual and potential for control. The results were used to determine residents' risk perception of the impact of blue green algae blooms on Socio-Ecological System resource availability and future development and growth potential. Focus groups were then conducted to validate the survey results. Research results demonstrate that residents are concerned about the impacts of blue-green algae blooms, but the level of interest in acting on those concerns and their willingness to consider more aggressive mitigation strategies varies across the study area. This research demonstrates the need for varied risk communication approaches, depending upon community mitigation goals.
The HAL 9000 Space Operating System Real-Time Planning Engine Design and Operations Requirements
NASA Technical Reports Server (NTRS)
Stetson, Howard; Watson, Michael D.; Shaughnessy, Ray
2012-01-01
In support of future deep space manned missions, an autonomous/automated vehicle, providing crew autonomy and an autonomous response planning system, will be required due to the light time delays in communication. Vehicle capabilities as a whole must provide for tactical response to vehicle system failures and space environmental effects induced failures, for risk mitigation of permanent loss of communication with Earth, and for assured crew return capabilities. The complexity of human rated space systems and the limited crew sizes and crew skills mix drive the need for a robust autonomous capability on-board the vehicle. The HAL 9000 Space Operating System[2] designed for such missions and space craft includes the first distributed real-time planning / re-planning system. This paper will detail the software architecture of the multiple planning engine system, and the interface design for plan changes, approval and implementation that is performed autonomously. Operations scenarios will be defined for analysis of the planning engines operations and its requirements for nominal / off nominal activities. An assessment of the distributed realtime re-planning system, in the defined operations environment, will be provided as well as findings as it pertains to the vehicle, crew, and mission control requirements needed for implementation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Phylip-Jones, J., E-mail: jonesjp@liverpool.ac.uk; Fischer, T.B., E-mail: fischer@liv.ac.uk
This paper reports on SEA applied in the wind energy sector in the UK and Germany. Based on a review of 18 SEAs, it is found that the quality of SEA documentation is variable, with over a third of them being deemed unsatisfactory. Furthermore, SEA processes are conducted to varying degrees of effectiveness, with scoping a strength but impact prediction and mitigation weaknesses. Generally speaking, the influence of SEA on German wind energy plan making was found to be low and the influence of SEA on UK plans deemed to be moderate. The German plans had a low influence mainlymore » because of a perceived high environmental performance of the underlying plans in the first instance. Substantive outcomes of SEA are not always clear and the influence of SEA on decision making is said to be limited in many cases. Finally, a lack of effective tiering between SEA and project level EIA is also observed. In addition, our findings echo some of the weaknesses of SEA practice found in previous studies of SEA effectiveness, including poor impact prediction and significance sections and a lack of detailed monitoring programmes for post plan implementation.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-17
... FDIC is responsible for administering or enforcing. The FDIC also has authority to adopt regulations... strategies, strategies to mitigate systemic risks and overall planning for an orderly resolution in the..., describing means of preserving franchise value, maximizing recovery to creditors, and minimizing systemic...
DOT National Transportation Integrated Search
1996-12-01
THIS PROJECT IDENTIFIED TRAFFIC PARAMETERS AND THEIR REQUIRED ACCURACIES FOR CHARACTERIZING TRAFFIC FLOW IN CONVENTIONAL AND NEWER INTELLIGENT TRANSPORTATION SYSTEMS (ITS), OBTAINED STATE-OF-THE-ART DETECTORS AND INSTALLED AND EVALUATED THEM IN THREE...
Social impacts of earthquakes caused by gas extraction in the Province of Groningen, The Netherlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voort, Nick van der, E-mail: nickvdvoort@gmail.com; Vanclay, Frank, E-mail: frank.vanclay@rug.nl
Gas extraction from the Groningen gasfield in the northern Netherlands has led to localised earthquakes which are projected to become more severe. The social impacts experienced by local residents include: damage to property; declining house prices; concerns about the chance of dykes breaking; feelings of anxiety and insecurity; health issues; and anger. These social and emotional impacts are exacerbated by the increasing distrust Groningen people have towards the national government and the gas company, NAM, a partnership between Shell and ExxonMobil. The earthquakes have reopened discussions about the distribution of benefits from gas production and the extent to which benefitsmore » are retained locally. Mitigation of the impacts is attempted, but the lack of trust decreases the effectiveness of the mitigation measures. The extent of this experience of previously-unforeseen, unanticipated impacts suggests that a new social and environmental impact assessment needs to be undertaken, and a new Social Impact Management Plan (SIMP) and Impacts and Benefits Agreement (IBA) developed, so that the project can regain its legitimacy and social licence to operate. In addition to conventional gas, this paper has wider relevance for unconventional gas developments, for example shale gas extraction by hydraulic fracturing methods (fracking). - Highlights: • Gas production in Groningen has caused over 1000 earthquakes. • The induced seismicity has caused many social impacts. • Impacts include building damage, reduced house prices, fear and health issues. • Mitigation measures attempted to date are inadequate. • Distrust towards the national government and operator hinders mitigation efforts. • Gas production in Groningen has lost its social licence to operate.« less
NASA Astrophysics Data System (ADS)
Adams, Russell; Owen, Gareth
2015-04-01
Over the past few years a series of catchment monitoring studies in the UK have developed a wide range of tools to enable managers and planners to make informed decisions to target several key outcomes. These outcomes include the mitigation of diffuse pollution and the reduction of flood risk. Good progress has been but additional steps are still required to link together more detailed models that represent catchment processes with the decision support systems (often termed matrices; i.e. DSMs) which form the basis of these planning and management tools. Examples include: (i) the FARM tools developed by the PROACTIVE team at Newcastle University to assess different catchment management options for mitigating against flooding events, (ii) TOPMANAGE, a suite of algorithms that link with high resolution DEMs to enable surface flow pathways, having the potential to be mitigated by Natural Flood Management (NFM) features (in order to target diffuse pollution due to nutrients and sediments) to be identified. To date, these DSMs have not been underpinned by models that can be run in real-time to quantify the benefits in terms of measurable reductions in flood or nutrient pollution risks. Their use has therefore been mostly as qualitative assessment tools. This study aims to adapt an existing spreadsheet-based model, the CRAFT, in order for it to become fully coupled to a DSM approach. Previous catchment scale applications of the CRAFT have focussed on meso-scale studies where any management interventions at a local scale are unlikely to be detectable at the monitoring point (the catchment outlet). The model has however been reasonably successful in identifying potential flow and transport pathways that link the headwater subcatchments to the outlet. Furthermore, recent enhancements to the model enable features such as sedimentation ponds and lagoons that can trap and remove nutrients and sediments to be added, once data become available from different types of NFM features to parameterise these. The model can be used to investigate runoff attenuation (in this case primarily through a lagged routing term applied to surface runoff) as a result of implementing mitigation measures. However to be fully integrated within a DSM framework requires the CRAFT to be linked to a user-friendly interface that will allow the user to modify key parameters, preferably using a web-based expert system, which will be explored further.
The future of hydropower planning modeling
NASA Astrophysics Data System (ADS)
Haas, J.; Zuñiga, D.; Nowak, W.; Olivares, M. A.; Castelletti, A.; Thilmant, A.
2017-12-01
Planning the investment and operation of hydropower plants with optimization tools dates back to the 1970s. The focus used to be solely on the provision of energy. However, advances in computational capacity and solving algorithms, dynamic markets, expansion of renewable sources, and a better understanding of hydropower environmental impacts have recently led to the development of novel planning approaches. In this work, we provide a review, systematization, and trend analysis of these approaches. Further, through interviews with experts, we outline the future of hydropower planning modeling and identify the gaps towards it. We classified the found models along environmental, economic, multipurpose and technical criteria. Environmental interactions include hydropeaking mitigation, water quality protection and limiting greenhouse gas emissions from reservoirs. Economic and regulatory criteria consider uncertainties of fossil fuel prices and relicensing of water rights and power purchase agreements. Multipurpose considerations account for irrigation, tourism, flood protection and drinking water. Recently included technical details account for sedimentation in reservoirs and variable efficiencies of turbines. Additional operational considerations relate to hydrological aspects such as dynamic reservoir inflows, water losses, and climate change. Although many of the above criteria have been addressed in detail on a project-to-project basis, models remain overly simplistic for planning large power fleets. Future hydropower planning tools are expected to improve the representation of the water-energy nexus, including environmental and multipurpose criteria. Further, they will concentrate on identifying new sources of operational flexibility (e.g. through installing additional turbines and pumps) for integrating renewable energy. The operational detail will increase, potentially emphasizing variable efficiencies, storage capacity losses due to sedimentation, and the timing of inflows (which are becoming more variable under climate change). Finally, the relicensing of existing operations and planning new installations are subject to deep uncertainties that need to be captured.
NASA Astrophysics Data System (ADS)
Caon, Lucrezia; Kessler, Aad; Keesstra, Saskia; Cruze, Rick
2014-05-01
Governments, companies and individuals with financial capital to invest, are worldwide buying or renting land in developing or third world countries. Uruguay is a developing country whose economy is mainly based on agriculture. Since 2000 many foreigners started to invest in the Uruguayan agricultural sector and to practice intensive large-scale agriculture. The significant presence of foreigners in the country is proven by the fact that almost 360 000 ha out of the 500 000 ha forming the study area were managed by foreigners in 2012. Nowadays farmers have abandoned the traditional crop rotation plan that included pasture to produce grain for export, and transgenic soya (soya RR) became the main crop planted by both foreigners and locals. Besides the high soil erosion rates related to having soya as main crop, planting soya implies the use of glyphosate, a broad-spectrum systemic herbicide leading to important environmental impacts. It is commonly said that foreigners investing in poor countries are exploiting the local natural resources aiming to get the highest possible profit from them. Is this a valid assumption in Uruguay? The purpose of this study was to compare the land management style of foreign and local farmers and to relate it to the soil erosion occurring in the study area. The land tenure (rented or owned fields) and the type of farmer interviewed ("individual farmer" equivalent to L.L.C. or "anonymous society" equivalent to P.L.C.) were taken into consideration during the analysis. Based on what stated by the farmers interviewed, the soil erosion simulations considered the seven most popular crop rotation plans on rented and owned fields, three ideals crop rotation plans, the application of no mitigation measures, and the construction of terraces and conservation buffers. Depending on the crop rotation plan, soils characterized by slope gradients higher than 2 resulted in soil erosion rates higher than the 7 ton/ha/year allowed by law. The highest soil erosion rates corresponded to crop rotation plans having high percentage of soybeans and low percentages of sorghum and/or maize. In addition, the soil erosion rate was even higher when only one crop, especially soybeans, was planted during an agricultural year. Although there were not significant differences in the land management style between foreign and local farmers, the land management style significantly differed between L.L.C. and P.L.C., and between owned and rented fields. Compared to L.L.C., P.L.C. applied more soil erosion mitigation measures on both rented and owned fields and invested in research. Owned fields resulted to be better managed than rented fields in which soil erosion mitigation measures were taken only in presence of an agreement with the landlord. Indeed, although the construction of terraces having a distance of 30-50 m significantly reduced the soil erosion rate, those were mainly built on owned fields.
Stewart, Sherri L.; Angell, William
2013-01-01
Introduction Radon is the second leading cause of lung cancer among smokers and the leading cause among nonsmokers. The US Environmental Protection Agency recommends that every home be tested for radon. Comprehensive Cancer Control (CCC) programs develop cancer coalitions that coordinate funding and resources to focus on cancer activities that are recorded in cancer plans. Radon tests, remediation, and radon mitigation techniques are relatively inexpensive, but it is unclear whether coalitions recognize radon as an important carcinogen. Methods We reviewed 65 cancer plans created from 2005 through 2011 for the terms “radon,” “radiation,” or “lung.” Plan activities were categorized as radon awareness, home testing, remediation, supporting radon policy activities, or policy evaluation. We also reviewed each CCC program’s most recent progress report. Cancer plan content was reviewed to assess alignment with existing radon-specific policies in each state. Results Twenty-seven of the plans reviewed (42%) had radon-specific terminology. Improving awareness of radon was included in all 27 plans; also included were home testing (n = 21), remediation (n = 11), support radon policy activities (n = 13), and policy evaluation (n = 1). Three plans noted current engagement in radon activities. Thirty states had radon-specific laws; most (n = 21) were related to radon professional licensure. Eleven states had cancer plan activities that aligned with existing state radon laws. Conclusion Although several states have radon-specific policies, approximately half of cancer coalitions may not be aware of radon as a public health issue. CCC-developed cancer coalitions and plans should prioritize tobacco control to address lung cancer but should consider addressing radon through partnership with existing radon control programs. PMID:23928457
Code of Federal Regulations, 2010 CFR
2010-01-01
... can your business include in an application for a pre-disaster mitigation loan? 123.401 Section 123.401 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster... a pre-disaster mitigation loan? To be included in a pre-disaster mitigation loan application, each...
Astronaut Thermal Exposure: Re-Entry After Low Earth Orbit Rescue Mission
NASA Technical Reports Server (NTRS)
Gillis, David B.; Hamilton, Douglas; Ilcus, Stana; Stepaniak, Phil; Son, Chang; Bue, Grant
2009-01-01
The STS-125 mission, launched May 11, 2009, is the final servicing mission to the Hubble Space Telescope. The repair mission's EVA tasks are described, including: installing a new wide field camera; installing the Cosmic Origins Spectrograph; repairing the Space Telescope Imaging Spectrograph; installing a new outer blanket layer; adding a Soft Capture and Rendezvous System for eventual controlled deorbit in about 2014; replacing the 'A' side Science Instrument Command and Data Handling module; repairing the Advanced Camera for surveys; and, replacing the rate sensor unit gyroscopes, fine guidance sensors and 3 batteries. Additionally, the Shuttle crew cabin thermal environment is described. A CFD model of per person CO2 demonstrates a discrepancy between crew breathing volume and general mid-deck levels of CO2. A follow-on CFD analysis of the mid-deck temperature distribution is provided. Procedural and engineering mitigation plans are presented to counteract thermal exposure upon reentry to the Earth atmosphere. Some of the procedures include: full cold soak the night prior to deorbit; modifying deck stowage to reduce interference with air flow; and early securing of avionics post-landing to reduce cabin thermal load prior to hatch opening. Engineering mitigation activities include modifying the location of the aft starboard ICUs, eliminating the X3 stack and eliminating ICU exhaust air directed onto astronauts; improved engineering data of ICU performance; and, verifying the adequacy of mid-deck temperature control using CFD models in addition to lumped parameter models. Post-mitigation CFD models of mid-deck temperature profiles and distribution are provided.
NASA Astrophysics Data System (ADS)
Martino, P.
1980-12-01
A general methodology is presented for conducting an analysis of the various aspects of the hazards associated with the storage and transportation of liquefied natural gas (LNG) which should be considered during the planning stages of a typical LNG ship terminal. The procedure includes the performance of a hazards and system analysis of the proposed site, a probability analysis of accident scenarios and safety impacts, an analysis of the consequences of credible accidents such as tanker accidents, spills and fires, the assessment of risks and the design and evaluation of risk mitigation measures.
First NASA Aviation Safety Program Weather Accident Prevention Project Annual Review
NASA Technical Reports Server (NTRS)
Colantonio, Ron
2000-01-01
The goal of this Annual Review was to present NASA plans and accomplishments that will impact the national aviation safety goal. NASA's WxAP Project focuses on developing the following products: (1) Aviation Weather Information (AWIN) technologies (displays, sensors, pilot decision tools, communication links, etc.); (2) Electronic Pilot Reporting (E-PIREPS) technologies; (3) Enhanced weather products with associated hazard metrics; (4) Forward looking turbulence sensor technologies (radar, lidar, etc.); (5) Turbulence mitigation control system designs; Attendees included personnel from various NASA Centers, FAA, National Weather Service, DoD, airlines, aircraft and pilot associations, industry, aircraft manufacturers and academia. Attendees participated in discussion sessions aimed at collecting aviation user community feedback on NASA plans and R&D activities. This CD is a compilation of most of the presentations presented at this Review.
Potter, Margaret A; Brown, Shawn T; Cooley, Phillip C; Sweeney, Patricia M; Hershey, Tina B; Gleason, Sherrianne M; Lee, Bruce Y; Keane, Christopher R; Grefenstette, John; Burke, Donald S
2012-11-14
States' pandemic influenza plans and school closure statutes are intended to guide state and local officials, but most faced a great deal of uncertainty during the 2009 influenza H1N1 epidemic. Questions remained about whether, when, and for how long to close schools and about which agencies and officials had legal authority over school closures. This study began with analysis of states' school-closure statutes and pandemic influenza plans to identify the variations among them. An agent-based model of one state was used to represent as constants a population's demographics, commuting patterns, work and school attendance, and community mixing patterns while repeated simulations explored the effects of variations in school closure authority, duration, closure thresholds, and reopening criteria. The results show no basis on which to justify statewide rather than school-specific or community-specific authority for school closures. Nor do these simulations offer evidence to require school closures promptly at the earliest stage of an epidemic. More important are criteria based on monitoring of local case incidence and on authority to sustain closure periods sufficiently to achieve epidemic mitigation. This agent-based simulation suggests several ways to improve statutes and influenza plans. First, school closure should remain available to state and local authorities as an influenza mitigation strategy. Second, influenza plans need not necessarily specify the threshold for school closures but should clearly define provisions for early and ongoing local monitoring. Finally, school closure authority may be exercised at the statewide or local level, so long as decisions are informed by monitoring incidence in local communities and schools.
Sharing Pacific-Rim experiences in disasters: summary and action plan.
Arias, E H; Asai, Y; Chen, J C; Cheng, H K; Ishii, N; Kinugasa, T; Ko, P C; Koido, Y; Murayama, Y; Kwong, P W; Ukai, T
2001-01-01
The discussions in this theme provided an opportunity to address the unique hazards facing the Pacific Rim. Details of the methods used are provided in the preceding paper. The chairs moderated all presentations and produced a summary that was presented to an assembly of all of the delegates. Since the findings from the Theme 3 and Theme 7 groups were similar, the chairs of both groups presided over one workshop that resulted in the generation of a set of action plans that then were reported to the collective group of all delegates. The main points developed during the presentations and discussion included: (1) communication, (2) coordination, (3) advance planning and risk assessment, and (4) resources and knowledge. Action plans were summarized in the following ideas: (1) plan disaster responses including the different types, identification of hazards, focusing training based on experiences, and provision of public education; (2) improve coordination and control; (3) maintain communications, assuming infrastructure breakdown; (4) maximize mitigation through standardized evaluations, the creation of a legal framework, and recognition of advocacy and public participation; and (5) provide resources and knowledge through access to existing therapies, the media, and increasing and decentralizing hospital inventories. The problems in the Asia-Pacific rim are little different from those encountered elsewhere in the world. They should be addressed in common with the rest of the world.
National Wetland Mitigation Banking Study Wetland Migitation Banking.
1994-02-01
the rest, but granted easements to HBWC 4. Mid City Ranch Humboldt CA Fish & Game CA Fish & Game, Humboldt CA Fish & Game County , CA City of...Eureka, Humboldt County County , City of Eureka 5. Mission Viejo/ Orange Mission Viejo USFWS, CA Dept. multiple - public- Orange ACWHEP...Broadway Wetlands Restoration Conceptual Plan yes in Humboldt County 6 - acre bank on 13-acre parcel mitigates for ’pockef marshes (2 acres
Focusing Events and Constrains on Policy Addressing Long-Term Climate Change Risks
NASA Astrophysics Data System (ADS)
O'Donovan, K.
2014-12-01
When policy makers are aware of immediate and long-term risks to communities, what do they do to plan for and mitigate the effects of climate change? This paper addresses that question in two ways. First, as an organizing framework it presents an overview of the empirical evidence on focusing events. Focusing events are defined as sudden, rare events that reveal harm or the potential for future harm that the general public and policy makers become aware of simultaneously. These large-scale events are typically natural and disasters, crisis, or technological accidents. This paper considers the empirical evidence of the relationship between focusing events, the harm revealed by the event and policy change aimed at reducing future risk of harm. Second, this paper reviews the case of flood mitigation policy in the United States from 1968 to 2008. It considers the ways in which policy makers have and have not integrated future flood risks into mitigation policy and planning, particularly after large-scale floods. It analyzes the political, intergovernmental, demographic and geographic factors that have promoted and constrained long-term flood mitigation policy. This paper concludes with a discussion of the meaning and implications of potential focusing events and constrains on policy for long-term climate change concerns.
Code of Federal Regulations, 2012 CFR
2012-01-01
... relocation as a mitigation measure in an application for a pre-disaster mitigation loan? 123.402 Section 123.402 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.402 Can your business include its relocation as a mitigation measure in an application...
Code of Federal Regulations, 2014 CFR
2014-01-01
... relocation as a mitigation measure in an application for a pre-disaster mitigation loan? 123.402 Section 123.402 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.402 Can your business include its relocation as a mitigation measure in an application...
Code of Federal Regulations, 2013 CFR
2013-01-01
... relocation as a mitigation measure in an application for a pre-disaster mitigation loan? 123.402 Section 123.402 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.402 Can your business include its relocation as a mitigation measure in an application...
Code of Federal Regulations, 2011 CFR
2011-01-01
... relocation as a mitigation measure in an application for a pre-disaster mitigation loan? 123.402 Section 123.402 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.402 Can your business include its relocation as a mitigation measure in an application...
Addressing Human System Risks to Future Space Exploration
NASA Technical Reports Server (NTRS)
Paloski, W. H.; Francisco, D. R.; Davis, J. R.
2015-01-01
NASA is contemplating future human exploration missions to destinations beyond low Earth orbit, including the Moon, deep-space asteroids, and Mars. While we have learned much about protecting crew health and performance during orbital space flight over the past half-century, the challenges of these future missions far exceed those within our current experience base. To ensure success in these missions, we have developed a Human System Risk Board (HSRB) to identify, quantify, and develop mitigation plans for the extraordinary risks associated with each potential mission scenario. The HSRB comprises research, technology, and operations experts in medicine, physiology, psychology, human factors, radiation, toxicology, microbiology, pharmacology, and food sciences. Methods: Owing to the wide range of potential mission characteristics, we first identified the hazards to human health and performance common to all exploration missions: altered gravity, isolation/confinement, increased radiation, distance from Earth, and hostile/closed environment. Each hazard leads to a set of risks to crew health and/or performance. For example the radiation hazard leads to risks of acute radiation syndrome, central nervous system dysfunction, soft tissue degeneration, and carcinogenesis. Some of these risks (e.g., acute radiation syndrome) could affect crew health or performance during the mission, while others (e.g., carcinogenesis) would more likely affect the crewmember well after the mission ends. We next defined a set of design reference missions (DRM) that would span the range of exploration missions currently under consideration. In addition to standard (6-month) and long-duration (1-year) missions in low Earth orbit (LEO), these DRM include deep space sortie missions of 1 month duration, lunar orbital and landing missions of 1 year duration, deep space journey and asteroid landing missions of 1 year duration, and Mars orbital and landing missions of 3 years duration. We then assessed the likelihood and consequences of each risk against each DRM, using three levels of likelihood (Low: less than or equal to 0.1%; Medium: 0.1%–1.0%; High: greater than or equal to 1.0%) and four levels of consequence ranging from Very Low (temporary or insignificant) to High (death, loss of mission, or significant reduction to length or quality of life). Quantitative evidence from clinical, operational, and research sources were used whenever available. Qualitative evidence was used when quantitative evidence was unavailable. Expert opinion was used whenever insufficient evidence was available. Results: A set of 30 risks emerged that will require further mitigation efforts before being accepted by the Agency. The likelihood by consequence risk assessment process provided a means of prioritizing among the risks identified. For each of the high priority risks, a plan was developed to perform research, technology, or standards development thought necessary to provide suitable reduction of likelihood or consequence to allow agency acceptance. Conclusion: The HSRB process has successfully identified a complete set of risks to human space travelers on planned exploration missions based on the best evidence available today. Risk mitigation plans have been established for the highest priority risks. Each risk will be reassessed annually to track the progress of our risk mitigation efforts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... can your business include in an application for a pre-disaster mitigation loan? 123.401 Section 123.401 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.401 What types of mitigation measures can your business include in an application for...
Code of Federal Regulations, 2014 CFR
2014-01-01
... can your business include in an application for a pre-disaster mitigation loan? 123.401 Section 123.401 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.401 What types of mitigation measures can your business include in an application for...
Code of Federal Regulations, 2012 CFR
2012-01-01
... can your business include in an application for a pre-disaster mitigation loan? 123.401 Section 123.401 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.401 What types of mitigation measures can your business include in an application for...
Code of Federal Regulations, 2013 CFR
2013-01-01
... can your business include in an application for a pre-disaster mitigation loan? 123.401 Section 123.401 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION DISASTER LOAN PROGRAM Pre-Disaster Mitigation Loans § 123.401 What types of mitigation measures can your business include in an application for...
Radon mitigation for the SuperCDMS SNOLAB dark matter experiment
NASA Astrophysics Data System (ADS)
Street, J.; Bunker, R.; Miller, E. H.; Schnee, R. W.; Snyder, S.; So, J.
2018-01-01
A potential background for the SuperCDMS SNOLAB dark matter experiment is from radon daughters that have plated out onto detector surfaces. To reach desired backgrounds, understanding plate-out rates during detector fabrication as well as mitigating radon in surrounding air is critical. A radon mitigated cleanroom planned at SNOLAB builds upon a system commissioned at the South Dakota School of Mines & Technology (SD Mines). The ultra-low radon cleanroom at SD Mines has air supplied by a vacuum-swing-adsorption radon mitigation system that has achieved >1000× reduction for a cleanroom activity consistent with zero and <0.067 Bq m-3 at 90% confidence. Our simulation of this system, validated against calibration data, provides opportunity for increased understanding and optimization for this and future systems.
Public Response to Community Mitigation Measures for Pandemic Influenza
Koonin, Lisa M.; Benson, John M.; Cetron, Martin S.; Pollard, William E.; Mitchell, Elizabeth W.; Weldon, Kathleen J.; Herrmann, Melissa J.
2008-01-01
We report the results of a national survey conducted to help public health officials understand the public’s response to community mitigation interventions for a severe outbreak of pandemic influenza. Survey results suggest that if community mitigation measures are instituted, most respondents would comply with recommendations but would be challenged to do so if their income or job were severely compromised. The results also indicate that community mitigation measures could cause problems for persons with lower incomes and for racial and ethnic minorities. Twenty-four percent of respondents said that they would not have anyone available to take care of them if they became sick with pandemic influenza. Given these results, planning and public engagement will be needed to encourage the public to be prepared. PMID:18439361
Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements
USDA-ARS?s Scientific Manuscript database
Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
...-FXES11120800000F2-123-F2] Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander... animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate the...
Code of Federal Regulations, 2012 CFR
2012-10-01
... procedures have been followed, and (3) The land management agency is willing to assume long-term... appropriations. The Commission will provide the Secretary's Representative with both long range and annual... plan in terms of meeting Section 8 mitigation obligations as directed by the Act. (iv) The Commission...
Messy Design: Organic Planning for Blended Learning
ERIC Educational Resources Information Center
Rankin, Andrea; Luzeckyj, Ann; Haggis, Jane; Gare, Callum
2016-01-01
In this paper we argue that a messy design process does not mitigate against sharing and transfer of artefacts across educational domains. In fact, such a process can aid in developing a model for learning and teaching that is reusable and authentic. We describe the planning and design of an integrated and interactive blended learning environment…
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2012 CFR
2012-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
40 CFR Appendix F to Part 112 - Facility-Specific Response Plan
Code of Federal Regulations, 2013 CFR
2013-07-01
... Prevention, Control, and Countermeasures (SPCC) Plan as required by 40 CFR 112.3. In these cases, owners or... sections for the non-transportation-related and transportation-related components, as described in § 112.20... of measure Response Action Actions Taken to Correct, Control or Mitigate Incident: Impact Number of...
National Infrastructure Protection Plan: Partnering to Enhance Protection and Resiliency
ERIC Educational Resources Information Center
US Department of Homeland Security, 2009
2009-01-01
The overarching goal of the National Infrastructure Protection Plan (NIPP) is to build a safer, more secure, and more resilient America by preventing, deterring, neutralizing, or mitigating the effects of deliberate efforts by terrorists to destroy, incapacitate, or exploit elements of our Nation's critical infrastructure and key resources (CIKR)…
The Effect of Mitigation Policy on Regional Climate Impacts on the U.S. Electric Sector
NASA Astrophysics Data System (ADS)
Cohen, S. M.; Sun, Y.; Strzepek, K.; McFarland, J.; Boehlert, B.; Fant, C.
2017-12-01
Climate change can influence the U.S. electricity sector in many ways, the nature of which can be shaped by energy and environmental policy choices. Changing temperatures affect electricity demand largely through heating and cooling needs, and temperatures also affect generation and transmission system performance. Altered precipitation patterns affect the regional and seasonal distribution of surface water runoff, which changes hydropower operation and thermal cooling water availability. The extent to which these stimuli influence U.S. power sector operation and planning will depend to some extent on whether or not proactive policies are enacted to mitigate these impacts. Mitigation policies such as CO2 emissions limits or technology restrictions can change the makeup of the electricity system while reducing the extent of climate change itself. We use the National Renewable Energy Laboratory's Regional Energy Deployment System (ReEDS), a U.S. electric sector capacity expansion model, to explore electric sector evolution through 2050 under alternative climate and policy assumptions. The model endogenously represents climate impacts on load, power system performance, cooling water availability, and hydropower, allowing internally consistent system responses to climate change along with projected technology, market, and policy conditions. We compare climate impacts across 5 global circulation models for a 8.5 W/m2 representative concentration pathway (RCP) without a climate mitigation policy and a 4.5 W/m2 RCP with climate mitigation. Climate drivers affect the capacity and generation mix at the national and regional levels, with relative growth of wind, solar, and natural gas-based technologies depending on local electricity system characteristics. These differences affect regional economic impacts, measured here as changes to electricity price and system costs. Mitigation policy reduces the economic and system impacts of climate change largely by moderating temperature-induced load but also by lessening water- and temperature-based performance constraints. Policy impacts are nuanced and region-specific, and this analysis underscores the importance of climate mitigation policy to regional electricity system planning decisions.
Human casualties in earthquakes: Modelling and mitigation
Spence, R.J.S.; So, E.K.M.
2011-01-01
Earthquake risk modelling is needed for the planning of post-event emergency operations, for the development of insurance schemes, for the planning of mitigation measures in the existing building stock, and for the development of appropriate building regulations; in all of these applications estimates of casualty numbers are essential. But there are many questions about casualty estimation which are still poorly understood. These questions relate to the causes and nature of the injuries and deaths, and the extent to which they can be quantified. This paper looks at the evidence on these questions from recent studies. It then reviews casualty estimation models available, and finally compares the performance of some casualty models in making rapid post-event casualty estimates in recent earthquakes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tallis, Heather, E-mail: htallis@tnc.org; Kennedy, Christina M., E-mail: ckennedy@tnc.org; Ruckelshaus, Mary
Emerging development policies and lending standards call for consideration of ecosystem services when mitigating impacts from development, yet little guidance exists to inform this process. Here we propose a comprehensive framework for advancing both biodiversity and ecosystem service mitigation. We have clarified a means for choosing representative ecosystem service targets alongside biodiversity targets, identified servicesheds as a useful spatial unit for assessing ecosystem service avoidance, impact, and offset options, and discuss methods for consistent calculation of biodiversity and ecosystem service mitigation ratios. We emphasize the need to move away from area- and habitat-based assessment methods for both biodiversity and ecosystemmore » services towards functional assessments at landscape or seascape scales. Such comprehensive assessments more accurately reflect cumulative impacts and variation in environmental quality, social needs and value preferences. The integrated framework builds on the experience of biodiversity mitigation while addressing the unique opportunities and challenges presented by ecosystem service mitigation. These advances contribute to growing potential for economic development planning and execution that will minimize impacts on nature and maximize human wellbeing. - Highlights: • This is the first framework for biodiversity and ecosystem service mitigation. • Functional, landscape scale assessments are ideal for avoidance and offsets. • Servicesheds define the appropriate spatial extent for ecosystem service mitigation. • Mitigation ratios should be calculated consistently and based on standard factors. • Our framework meets the needs of integrated mitigation assessment requirements.« less
Influence of evapotranspiration on thermal comfort in central European cities
NASA Astrophysics Data System (ADS)
Goldbach, A.; Kuttler, W.
2012-04-01
In future, more and more people will be exposed to the negative thermal effects of urban climate, which will be exacerbated by predicted climate change. In regard to urban climate studies, it is necessary to develop adaptation and mitigation strategies tailored to the problem area and to include them in the local planning process. Urban green spaces or water bodies could help to mitigate the radiation and air temperature. For this purpose eddy-covariance technique has been carried out in Oberhausen (Germany; 51° N, 6° E) between 15 August 2010 and 14 August 2011 to quantify turbulent sensible and latent heat fluxes in areas with various types of urban land use. The results show that sensible heat flux (QH) is 20 % higher, latent heat flux (QE) 90 % lower at the urban (URB) site compared to the suburban one (SUB). Furthermore, partition of the turbulent heat fluxes (QH/Q* resp. QE/Q*) clearly depends on plan area density (λP). The human-biometeorological thermal index, the physiologically equivalent temperature (PET), demonstrates that green spaces counteract growing thermal stress on city-dwellers due to improving thermal comfort. Aside from the positive effect of shading, inner-city green spaces can only be effective if an adequate water supply is ensured. Otherwise, the positive thermal effects of green spaces resulting from transpiration will be reduced to a minimum or eliminated entirely, which is confirmed by the measured values. Additional planning recommendations for urban planners within cities located at mid-latitudes derived from measuring results are given.
The U.S. National Tsunami Hazard Mitigation Program: Successes in Tsunami Preparedness
NASA Astrophysics Data System (ADS)
Whitmore, P.; Wilson, R. I.
2012-12-01
Formed in 1995 by Congressional Action, the National Tsunami Hazards Mitigation Program (NTHMP) provides the framework for tsunami preparedness activities in the United States. The Program consists of the 28 U.S. coastal states, territories, and commonwealths (STCs), as well as three Federal agencies: the National Oceanic and Atmospheric Administration (NOAA), the Federal Emergency Management Agency (FEMA), and the United States Geological Survey (USGS). Since its inception, the NTHMP has advanced tsunami preparedness in the United States through accomplishments in many areas of tsunami preparedness: - Coordination and funding of tsunami hazard analysis and preparedness activities in STCs; - Development and execution of a coordinated plan to address education and outreach activities (materials, signage, and guides) within its membership; - Lead the effort to assist communities in meeting National Weather Service (NWS) TsunamiReady guidelines through development of evacuation maps and other planning activities; - Determination of tsunami hazard zones in most highly threatened coastal communities throughout the country by detailed tsunami inundation studies; - Development of a benchmarking procedure for numerical tsunami models to ensure models used in the inundation studies meet consistent, NOAA standards; - Creation of a national tsunami exercise framework to test tsunami warning system response; - Funding community tsunami warning dissemination and reception systems such as sirens and NOAA Weather Radios; and, - Providing guidance to NOAA's Tsunami Warning Centers regarding warning dissemination and content. NTHMP activities have advanced the state of preparedness of United States coastal communities, and have helped save lives and property during recent tsunamis. Program successes as well as future plans, including maritime preparedness, are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bentz, A
While the reality of an improvised nuclear device (IND) being detonated in an American city is unlikely, its destructive power is such that the scenario must be planned for. Upon reviewing the academic literature on the effects of and response to IND events, this report looks to actual responders from around the country. The results from the meetings of public officials in the cities show where gaps exist between theoretical knowledge and actual practice. In addition to the literature, the meetings reveal areas where future research needs to be conducted. This paper recommends that local response planners: meet to discussmore » the challenges of IND events; offer education to officials, the public, and responders on IND events; incorporate 'shelter-first' into response plans; provide information to the public and responders using the 3 Cs; and engage the private sector (including media) in response plans. In addition to these recommendations for the response planners, the paper provides research questions that once answered will improve response plans around the country. By following the recommendations, both groups, response planners and researchers, can help the country better prepare for and mitigate the effects of an IND detonation.« less
WE-D-BRB-00: Basics of Proton Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The goal of this session is to review the physics of proton therapy, treatment planning techniques, and the use of volumetric imaging in proton therapy. The course material covers the physics of proton interaction with matter and physical characteristics of clinical proton beams. It will provide information on proton delivery systems and beam delivery techniques for double scattering (DS), uniform scanning (US), and pencil beam scanning (PBS). The session covers the treatment planning strategies used in DS, US, and PBS for various anatomical sites, methods to address uncertainties in proton therapy and uncertainty mitigation to generate robust treatment plans. Itmore » introduces the audience to the current status of image guided proton therapy and clinical applications of CBCT for proton therapy. It outlines the importance of volumetric imaging in proton therapy. Learning Objectives: Gain knowledge in proton therapy physics, and treatment planning for proton therapy including intensity modulated proton therapy. The current state of volumetric image guidance equipment in proton therapy. Clinical applications of CBCT and its advantage over orthogonal imaging for proton therapy. B. Teo, B.K Teo had received travel funds from IBA in 2015.« less
Between Oais and Agile a Dynamic Data Management Approach
NASA Astrophysics Data System (ADS)
Bennett, V. L.; Conway, E. A.; Waterfall, A. M.; Pepler, S.
2015-12-01
In this paper we decribe an approach to the integration of existing archival activities which lies between compliance with the more rigid OAIS/TRAC standards and a more flexible "Agile" approach to the curation and preservation of Earth Observation data. We provide a high level overview of existing practice and discuss how these procedures can be extended and supported through the description of preservation state. The aim of which is to facilitate the dynamic controlled management of scientific data through its lifecycle. While processes are considered they are not statically defined but rather driven by human interactions in the form of risk management/review procedure that produce actionable plans, which are responsive to change. We then proceed by describing the feasibility testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospheric Data Centre and NERC Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2 Petabytes of data and 137 million individual files, which were analysed and characterised in terms of format, based risk. We are then able to present an overview of the format based risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets We continue by presenting a dynamic data management information model and provide discussion of the following core model entities and their relationships: Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans which support responsive interactions with the community. The Result entities describe the outcomes of the plans. This includes Acquisitions. Mitigations and Accepted Risks. With risk acceptance permitting imperfect but functional solutions that can be realistically supported within an archives resource levels
Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Childs, Allen
This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less
Modelling farm vulnerability to flooding: A step toward vulnerability mitigation policies appraisal
NASA Astrophysics Data System (ADS)
Brémond, P.; Abrami, G.; Blanc, C.; Grelot, F.
2009-04-01
Recent catastrophic flood events such as Elbe in 2002 or Rhône in 2003 have shown limits of flood management policies relying on dykes protection: worsening of flood impacts downstream, increased damage by dykes rupture. Those events, among others, contributes to radical changes on the philosophy of flood prevention, with the promotion of new orientations for mitigating flood exposition. Two new trends may have a significant impact on rural areas: floodplain restoration and vulnerability mitigation. The Rhône River program, which is an contract of objectives signed between French Government and local collectivites, is highly illustrative of these new trends and their impact on agricultural sector. In this program, it appears that areas to be concerned by floodplain restoration are agricultural ones, because their supposed vulnerability to flood is expected to be less important to urban areas. As a consequence, agricultural sector is particularly concerned by planned actions on mitigation of assets vulnerability, an important part of the program (financial support of European Union of 7.5 Million euros). Mitigation of agricultural assets vulnerability reveals particularly interesting for two following reasons. Firstly, it is a way to maintain agricultural activities in floodplains yet existing, without promoting flood protection. Secondly, in case of floodplain restoration, vulnerability mitigation is a way for local authorities to compensate over-flooding impacts. In practice, local authorities may financially support farmers for implementing measures to mitigate their farm vulnerability. On the Rhône River, an important work has already been done to identify farm vulnerability to flooding, and propose measures to mitigate it. More than 3 000 farms exposed to flood risk have been identified representing 88 690 ha of agricultural areas which is estimated to generate damage between 400 and 800 Million euros depending on the season of occurrence for a catastrophic flood. In the case of farm activities, vulnerability mitigation consists in implementing measures which can be: physical (equipment or electric power system elevation), organizational (emergency or recovery plan) or financial (insurance). These measures aim at decreasing the total damage incurred by farmers in case of flooding. For instance, if equipment is elevated, it will not suffer direct damage such as degradation. As a consequence, equipment will be available to continue production or recovery tasks, thus, avoiding indirect damage such as delays, indebtedness⦠The effects of these policies on farms, in particular vulnerability mitigation cannot be appraised using current methodologies mainly because they do not consider farm as a whole and focus on direct damage at the land plot scale (loss of yield). Moreover, since vulnerability mitigation policies are quite recent, few examples of implementation exist and no feedback experience can be processed. Meanwhile, decision makers and financial actors require more justification of the efficiency of public fund by economic appraisal of the projects. On the Rhône River, decision makers asked for an economic evaluation of the program of farm vulnerability mitigation they plan to implement. This implies to identify the effects of the measures to mitigate farm vulnerability, and to classify them by comparing their efficacy (avoided damage) and their cost of implementation. In this presentation, we propose and discuss a conceptual model of vulnerability at the farm scale. The modelling, in Unified Modelling Language, enabled to represent the ties between spatial, organizational and temporal dimensions, which are central to understanding of farm vulnerability and resilience to flooding. Through this modelling, we encompass three goals: To improve the comprehension of farm vulnerability and create a framework that allow discussion with experts of different disciplines as well as with local farmers; To identify data which are needed to implement the model and to collect them, specifically using the focus group method; Based on the conceptual model, to program a mathematical model which will be used to simulate damage (direct and indirect) on farm due to flood. This last objective should enable us to appraise policy to mitigate vulnerability which is planned to be implemented on Rhône River at the individual and regional scale. Finally, we discuss the possibility to use the UML modelling to develop a multi-agent system approach which could be interesting to take into account ties between farmers (solidarity, loan of equipment) or systemic effects due to the damage incurred by economic partners (loss of market share). Keywords vulnerability, UML modelling, farming systems, flood, mitigation policy, economic valuation
Idaho Habitat Evaluation for Off-Site Mitigation Record : Annual Report 1988.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Idaho. Dept. of Fish and Game.
1990-03-01
The Idaho Department of Fish and Game (IDFG) has been monitoring and evaluating existing and proposed habitat improvement projects for steelhead and chinook in the Clearwater and Salmon subbasins since 1984. Projects included in the monitoring are funded by, or proposed for funding by, the Bonneville Power Administration (BPA) under the Northwest Power Planning Act as off-site mitigation for downstream hydropower development on the Snake and Columbia Rivers. This monitoring project is also funded under the same authority. A mitigation record is being developed to use actual and potential increases in smolt production as the best measures of benefit frommore » a habitat improvement project. This project is divided into two subprojects: general and intensive monitoring. Primary objectives of the general monitoring subproject are to determine natural production increases due to habitat improvement projects in terms of parr production and to determine natural production status and trends in Idaho. The second objective is accomplished by combining parr density from monitoring and evaluation of BPA habitat projects and from other IDFG management and research activities. The primary objective of the intensive monitoring subproject is to determine the relationships between spawning escapement, parr production, and smolt production in two Idaho streams; the upper Salmon River and Crooked River. Results of the intensive monitoring will be used to estimate mitigation benefits in terms of smolt production and to interpret natural production monitoring in Idaho. 30 refs., 19 figs., 34 tabs.« less
WE-D-BRB-02: Proton Treatment Planning and Beam Optimization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pankuch, M.
2016-06-15
The goal of this session is to review the physics of proton therapy, treatment planning techniques, and the use of volumetric imaging in proton therapy. The course material covers the physics of proton interaction with matter and physical characteristics of clinical proton beams. It will provide information on proton delivery systems and beam delivery techniques for double scattering (DS), uniform scanning (US), and pencil beam scanning (PBS). The session covers the treatment planning strategies used in DS, US, and PBS for various anatomical sites, methods to address uncertainties in proton therapy and uncertainty mitigation to generate robust treatment plans. Itmore » introduces the audience to the current status of image guided proton therapy and clinical applications of CBCT for proton therapy. It outlines the importance of volumetric imaging in proton therapy. Learning Objectives: Gain knowledge in proton therapy physics, and treatment planning for proton therapy including intensity modulated proton therapy. The current state of volumetric image guidance equipment in proton therapy. Clinical applications of CBCT and its advantage over orthogonal imaging for proton therapy. B. Teo, B.K Teo had received travel funds from IBA in 2015.« less
Directional Gila River crossing saves construction, mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saylor, L.A.
1994-12-01
Directional drilled river crossing technology gained a new convert this fall as El Paso Natural Gas Co. (EPNG) replaced a washed out 10 3/4-in. line that crossed the Gila River and two irrigation canals near Yuma, Ariz. The 1,650-ft bore, the company's first drilled river crossing, saved both construction costs and environmental reporting and mitigation expenses. This paper reviews the planning, engineering, and equipment used to install this river pipeline crossing.
Brown, Morgan L; Nasr, Viviane G; Toohey, Rebecca; DiNardo, James A
2018-03-23
Patients with Williams syndrome are considered at high risk for anesthesia-related adverse events. At our institution, all William syndrome patients undergoing cardiac surgical, cardiac catheterization/interventional procedures, and cardiac imaging studies are cared for by cardiac anesthesiologists. All William syndrome patients undergoing non-cardiac surgical, interventional, or imaging studies are cared for by main operating room pediatric anesthesiologists with consultative input from a cardiac anesthesiologist. We reviewed our experience with 75 patients undergoing 202 separate anesthetics for 95 non-cardiac procedures and 107 cardiac procedures from 2012 to 2016. The mean age was 7.5 ± 7.0 years and the mean weight was 22.3 ± 17.0 kg. One hundred and eighty-seven patients had a general anesthetic (92.6%). Medications used included etomidate in 26.2%, propofol in 37.6%, isoflurane in 47.5%, and sevoflurane in 68.3%. Vasopressors and inotropes were required including calcium (22.8%), dopamine (10.4%), norepinephrine (17.3%), phenylephrine (35.1%), vasopressin (0.5%), and ephedrine (5.4%). The median length of stay after anesthesia was 2.8 days (range 0-32). No adverse events occurred in 89.6% of anesthetics. There were two cases of cardiac arrest, one of which required extracorporeal life support for resuscitation. Of the non-cardiac surgical procedures, 95.7% did not have a cardiovascular adverse event. Patients with Williams syndrome are at high risk for anesthesia, especially when undergoing cardiac procedures. The risk can be mitigated with appropriate planning and adherence to the hemodynamic goals for non-cardiac surgical procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kent, R.A.; Andersen, D.; Simpson, A.
1995-12-31
Historically, aircraft deicing fluids have simply drained from aircraft and runway surfaces into airport drainage systems and invariably end up in surrounding receiving aquatic systems. This led to recent concerns over environmental impacts from glycol-based fluids typically used for deicing aircraft. Glycols from de-icing fluids have been detected at high levels at Canadian airports. Concern not only stems from the high volumes being used at relatively few point sources, but also to the higher toxicity of the formulated de-icing fluids, compared to pure glycols. As a result, significant environmental management efforts have been made at Canadian airports over the lastmore » 4 years, including extensive stormwater monitoring, glycol mitigation and pollution prevention plans. Site-specific mitigation plans have been implemented at 15 major Canadian airports which typically include glycol containment, collection and removal. While a reasonable dataset is available on the toxicity of pure glycols, much less information is available on the toxicity of formulated deicers. Furthermore, there have been very few field assessments of the aquatic impacts of de-icing. To date, management regimes developed to address the problem in Canada have focused almost exclusively on glycols and voluntary compliance to discharge limits and receiving water quality guidelines. This approach has resulted in reductions in the quantities of glycols which are released from Canadian airports into the surrounding environment. Currently, government and industry are refining this management system with an examination of new approaches and options such as more holistic airport wastewater quality assessments and toxicity-based guidelines.« less
Kinlaw, Kathy; Barrett, Drue H; Levine, Robert J
2009-12-01
Because of the importance of including ethical considerations in planning efforts for pandemic influenza, in February 2005 the Centers for Disease Control and Prevention requested that the Ethics Subcommittee of the Advisory Committee to the Director develop guidance that would serve as a foundation for decision making in preparing for and responding to pandemic influenza. Specifically, the ethics subcommittee was asked to make recommendations regarding ethical considerations relevant to decision making about vaccine and antiviral drug distribution prioritization and development of interventions that would limit individual freedom and create social distancing. The ethics subcommittee identified a number of general ethical considerations including identification of clear goals for pandemic planning, responsibility to maximize preparedness, transparency and public engagement, sound science, commitment to the global community, balancing individual liberty and community interests, diversity in ethical decision making, and commitment to justice. These general ethical considerations are applied to the issues of vaccine and antiviral drug distribution and use of community mitigation interventions.
Life-finding detector development at NASA GSFC using a custom H4RG test bed
NASA Astrophysics Data System (ADS)
Mosby, Gregory; Rauscher, Bernard; Kutyrev, Alexander
2018-01-01
Chemical species associated with life, called biosignatures, should be visible in exoplanet atmospheres with larger space telescopes. These signals will be faint and require very low noise (~e-) detectors to robustly measure. At NASA Goddard we are developing a single detector H4RG test bed to characterize and identify potential technology developments needed for the next generation's large space telescopes. The vacuum and cryogenic test bed will include near infrared light sources from integrating spheres using a motorized shutter. The detector control and readout will be handled by a Leach controller. Detector cables have been manufactured and test planning has begun. Planned tests include testing minimum read noise capabilities, persistence mitigation strategies using long wavelength light, and measuring intrapixel variation which might affect science goals of future missions. In addition to providing a means to identify areas of improvement in detector technology, we hope to use this test bed to probe some fundamental physics of these infrared arrays.
Peterson, Lauren; Comfort, Alison; Hatt, Laurel; van Bastelaer, Thierry
2018-04-15
As a growing number of low- and middle-income countries commit to achieving universal health coverage, one key challenge is how to extend coverage to informal sector workers. Micro health insurance (MHI) provides a potential model to finance health services for this population. This study presents lessons from a pilot study of a mandatory MHI plan offered by a private insurance company and distributed through a microfinance bank to urban, informal sector workers in Lagos, Nigeria. Study methods included a survey of microfinance clients, key informant interviews, and a review of administrative records. Demographic, health care seeking, and willingness-to-pay data suggested that microfinance clients, particularly women, could benefit from a comprehensive MHI plan that improved access to health care and reduced out-of-pocket spending on health services. However, administrative data revealed declining enrollment, and key informant interviews further suggested low use of the health insurance plan. Key implementation challenges, including changes to mandatory enrollment requirements, insufficient client education and marketing, misaligned incentives, and weak back-office systems, undermined enrollment and use of the plan. Mandatory MHI plans, intended to mitigate adverse selection and facilitate private insurers' entry into new markets, present challenges for covering informal sector workers, including when distributed through agents such as a microfinance bank. Properly aligning the incentives of the insurer and the agent are critical to effectively distribute and service insurance. Further, an urban environment presents unique challenges for distributing MHI, addressing client perceptions of health insurance, and meeting their health care needs. Copyright © 2018 John Wiley & Sons, Ltd.
Coleman, C Norman; Parker, Gerald W
2009-06-01
Society's and individuals' concerns about the adverse effects from radiation are logically amplified many times when radiological terrorism is considered. The spectrum of events include industrial sabotage, the use of an explosive or non-explosive radiological dispersal device, the placement of a radiological exposure device in a public facility and the use of an improvised nuclear device. The consequences of an event relate to the physical and medical damage of the event itself, the financial impact, and the acute and long-term medical consequences, including fear of radiation-induced cancer. The magnitude of a state-sponsored nuclear event is so great that limited detailed response planning had been done in the past, as compared to the work now ongoing. Planning is done on the basis of scenario modelling. Medical response planning includes medical triage, distribution of victims to care by experienced physicians, developing medical countermeasures to mitigate or treat radiation injury, counselling and appropriately following exposed or potentially exposed people, and helping the local community develop confidence in their own response plan. Optimal response must be based on the best available science. This requires scientists who can define, prioritise and address the gaps in knowledge with the range of expertise from basic physics to biology to translational research to systems expertise to response planning to healthcare policy to communications. Not only are there unique needs and career opportunities, but there is also the opportunity for individuals to serve their communities and country with education regarding radiation effects and by formulating scientifically based government policy.
A data-driven approach to quality risk management.
Alemayehu, Demissie; Alvir, Jose; Levenstein, Marcia; Nickerson, David
2013-10-01
An effective clinical trial strategy to ensure patient safety as well as trial quality and efficiency involves an integrated approach, including prospective identification of risk factors, mitigation of the risks through proper study design and execution, and assessment of quality metrics in real-time. Such an integrated quality management plan may also be enhanced by using data-driven techniques to identify risk factors that are most relevant in predicting quality issues associated with a trial. In this paper, we illustrate such an approach using data collected from actual clinical trials. Several statistical methods were employed, including the Wilcoxon rank-sum test and logistic regression, to identify the presence of association between risk factors and the occurrence of quality issues, applied to data on quality of clinical trials sponsored by Pfizer. ONLY A SUBSET OF THE RISK FACTORS HAD A SIGNIFICANT ASSOCIATION WITH QUALITY ISSUES, AND INCLUDED: Whether study used Placebo, whether an agent was a biologic, unusual packaging label, complex dosing, and over 25 planned procedures. Proper implementation of the strategy can help to optimize resource utilization without compromising trial integrity and patient safety.
energy solutions for emission mitigation, international climate change strategies, and renewable energy technical decision making. Andrea's expertise lies in strategic planning, change strategies, and decision
7 CFR 12.30 - NRCS responsibilities regarding wetlands.
Code of Federal Regulations, 2010 CFR
2010-01-01
... approve wetland determinations, delineations and certifications, functional assessments, mitigation plans... production of food, fiber, or horticultural crops, a certification made under this section will remain valid...
, energy and water audits, greenhouse gas mitigation, energy-water-food nexus analysis and strategy planning, and asset management. Research Interests Energy-water-food nexus Sustainable development and
NASA Astrophysics Data System (ADS)
Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles
2015-04-01
In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.
Reducing risk where tectonic plates collide—U.S. Geological Survey subduction zone science plan
Gomberg, Joan S.; Ludwig, Kristin A.; Bekins, Barbara; Brocher, Thomas M.; Brock, John C.; Brothers, Daniel; Chaytor, Jason D.; Frankel, Arthur; Geist, Eric L.; Haney, Matt; Hickman, Stephen H.; Leith, William S.; Roeloffs, Evelyn A.; Schulz, William H.; Sisson, Thomas W.; Wallace, Kristi; Watt, Janet; Wein, Anne M.
2017-06-19
The U.S. Geological Survey (USGS) serves the Nation by providing reliable scientific information and tools to build resilience in communities exposed to subduction zone earthquakes, tsunamis, landslides, and volcanic eruptions. Improving the application of USGS science to successfully reduce risk from these events relies on whole community efforts, with continuing partnerships among scientists and stakeholders, including researchers from universities, other government labs and private industry, land-use planners, engineers, policy-makers, emergency managers and responders, business owners, insurance providers, the media, and the general public.Motivated by recent technological advances and increased awareness of our growing vulnerability to subduction-zone hazards, the USGS is uniquely positioned to take a major step forward in the science it conducts and products it provides, building on its tradition of using long-term monitoring and research to develop effective products for hazard mitigation. This science plan provides a blueprint both for prioritizing USGS science activities and for delineating USGS interests and potential participation in subduction zone science supported by its partners.The activities in this plan address many USGS stakeholder needs:High-fidelity tools and user-tailored information that facilitate increasingly more targeted, neighborhood-scale decisions to mitigate risks more cost-effectively and ensure post-event operability. Such tools may include maps, tables, and simulated earthquake ground-motion records conveying shaking intensity and frequency. These facilitate the prioritization of retrofitting of vulnerable infrastructure;Information to guide local land-use and response planning to minimize development in likely hazardous zones (for example, databases, maps, and scenario documents to guide evacuation route planning in communities near volcanoes, along coastlines vulnerable to tsunamis, and built on landslide-prone terrain);New tools to assess the potential for cascading hazards, such as landslides, tsunamis, coastal changes, and flooding caused by earthquakes or volcanic eruptions;Geospatial models of permanent, widespread land- and sea-level changes that may occur in the immediate aftermath of great (M ≥8.0) subduction zone earthquakes;Strong partnerships between scientists and public safety providers for effective decision making during periods of elevated hazard and risk;Accurate forecasts of far-reaching hazards (for example, ash clouds, tsunamis) to avert catastrophes and unnecessary disruptions in air and sea transportation;Aftershock forecasts to guide decisions about when and where to re-enter, repair, or rebuild buildings and infrastructure, for all types of subduction zone earthquakes.
Redefining thermal regimes to design reserves for coral reefs in the face of climate change.
Chollett, Iliana; Enríquez, Susana; Mumby, Peter J
2014-01-01
Reef managers cannot fight global warming through mitigation at local scale, but they can use information on thermal patterns to plan for reserve networks that maximize the probability of persistence of their reef system. Here we assess previous methods for the design of reserves for climate change and present a new approach to prioritize areas for conservation that leverages the most desirable properties of previous approaches. The new method moves the science of reserve design for climate change a step forwards by: (1) recognizing the role of seasonal acclimation in increasing the limits of environmental tolerance of corals and ameliorating the bleaching response; (2) using the best proxy for acclimatization currently available; (3) including information from several bleaching events, which frequency is likely to increase in the future; (4) assessing relevant variability at country scales, where most management plans are carried out. We demonstrate the method in Honduras, where a reassessment of the marine spatial plan is in progress.
WFIRST: Simulating the Wide-Field Sky
NASA Astrophysics Data System (ADS)
Peeples, Molly; WFIRST Wide Field Imager Simulations Working Group
2018-01-01
As astronomy’s first high-resolution wide-field multi-mode instrument, simulated data will play a vital role in the planning for and analysis of data from WFIRST’s WFI (Wide Field Imager) instrument. Part of the key to WFIRST’s scientific success lies in our ability to push the systematics limit, but in order to do so, the WFI pipeline will need to be able to measure and take out said systematics. The efficacy of this pipeline can only be verified with large suites of synthetic data; these data must include both the range of astrophysical sky scenes (from crowded starfields to high-latitude grism data observations) and the systematics from the detector and telescope optics the WFI pipeline aims to mitigate. We summarize here(1) the status of current and planned astrophysical simulations in support of the WFI,(2) the status of current WFI instrument simulators and requirements on future generations thereof, and(3) plans, methods, and requirements on interfacing astrophysical simulations and WFI instrument simulators.
Redefining Thermal Regimes to Design Reserves for Coral Reefs in the Face of Climate Change
Chollett, Iliana; Enríquez, Susana; Mumby, Peter J.
2014-01-01
Reef managers cannot fight global warming through mitigation at local scale, but they can use information on thermal patterns to plan for reserve networks that maximize the probability of persistence of their reef system. Here we assess previous methods for the design of reserves for climate change and present a new approach to prioritize areas for conservation that leverages the most desirable properties of previous approaches. The new method moves the science of reserve design for climate change a step forwards by: (1) recognizing the role of seasonal acclimation in increasing the limits of environmental tolerance of corals and ameliorating the bleaching response; (2) using the best proxy for acclimatization currently available; (3) including information from several bleaching events, which frequency is likely to increase in the future; (4) assessing relevant variability at country scales, where most management plans are carried out. We demonstrate the method in Honduras, where a reassessment of the marine spatial plan is in progress. PMID:25333380
Recovering from the ShakeOut earthquake
Wein, Anne; Johnson, Laurie; Bernknopf, Richard
2011-01-01
Recovery from an earthquake like the M7.8 ShakeOut Scenario will be a major endeavor taking many years to complete. Hundreds of Southern California municipalities will be affected; most lack recovery plans or previous disaster experience. To support recovery planning this paper 1) extends the regional ShakeOut Scenario analysis into the recovery period using a recovery model, 2) localizes analyses to identify longer-term impacts and issues in two communities, and 3) considers the regional context of local recovery.Key community insights about preparing for post-disaster recovery include the need to: geographically diversify city procurement; set earthquake mitigation priorities for critical infrastructure (e.g., airport), plan to replace mobile homes with earthquake safety measures, consider post-earthquake redevelopment opportunities ahead of time, and develop post-disaster recovery management and governance structures. This work also showed that communities with minor damages are still sensitive to regional infrastructure damages and their potential long-term impacts on community recovery. This highlights the importance of community and infrastructure resilience strategies as well.
Isla Hispaniola: A trans-boundary flood risk mitigation plan
NASA Astrophysics Data System (ADS)
Brandimarte, Luigia; Brath, Armando; Castellarin, Attilio; Baldassarre, Giuliano Di
It is sadly known that over the past decades Isla Hispaniola (Haiti and the Dominican Republic) has been exposed to the devastating passage of several hurricanes and tropical storms. Territories that are economically weak and extremely poor in terms of natural resources have been shaken by severe flood events that caused the loss of thousands of human lives, displacement of people and damage to the environment. On May 24th 2004, the flooding of the trans-boundary river Soliette killed over 1000 Haitian and Dominican people, wiping out villages and leaving behind desolation and poverty. After this catastrophic flood event, the General Direction for Development and Cooperation of the Italian Department of Foreign Affairs funded through the Istituto Italo-Latino Americano (IILA, www.iila.org) an international cooperation initiative (ICI), coordinated and directed by the University of Bologna. The ICI involved Haitian and Dominican institutions and was twofold: (a) institutional capacity building on flood risk management and mitigation measures and policies; (b) hydrological and hydraulic analysis of the May 2004 flood event aimed at formulating a suitable and affordable flood risk mitigation plan, consisting of structural and non-structural measures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunnigan, James; DeShazer, J.; Garrow, L.
Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possiblemore » conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.« less
Modelling Multi Hazard Mapping in Semarang City Using GIS-Fuzzy Method
NASA Astrophysics Data System (ADS)
Nugraha, A. L.; Awaluddin, M.; Sasmito, B.
2018-02-01
One important aspect of disaster mitigation planning is hazard mapping. Hazard mapping can provide spatial information on the distribution of locations that are threatened by disaster. Semarang City as the capital of Central Java Province is one of the cities with high natural disaster intensity. Frequent natural disasters Semarang city is tidal flood, floods, landslides, and droughts. Therefore, Semarang City needs spatial information by doing multi hazard mapping to support disaster mitigation planning in Semarang City. Multi Hazards map modelling can be derived from parameters such as slope maps, rainfall, land use, and soil types. This modelling is done by using GIS method with scoring and overlay technique. However, the accuracy of modelling would be better if the GIS method is combined with Fuzzy Logic techniques to provide a good classification in determining disaster threats. The Fuzzy-GIS method will build a multi hazards map of Semarang city can deliver results with good accuracy and with appropriate threat class spread so as to provide disaster information for disaster mitigation planning of Semarang city. from the multi-hazard modelling using GIS-Fuzzy can be known type of membership that has a good accuracy is the type of membership Gauss with RMSE of 0.404 the smallest of the other membership and VAF value of 72.909% of the largest of the other membership.
Chapter 12 - Mapping wildland fuel across large regions for the LANDFIRE Prototype Project
Robert E. Keane; Tracey Frescino; Matthew C. Reeves; Jennifer L. Long
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required that the entire array of wildland fuel characteristics be mapped to provide fire and landscape managers with consistent baseline geo-spatial information to plan projects for hazardous fuel mitigation and to improve public and firefighter safety. Fuel...
50 CFR 18.114 - How do I obtain a Letter of Authorization?
Code of Federal Regulations, 2012 CFR
2012-10-01
... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...
50 CFR 18.114 - How do I obtain a Letter of Authorization?
Code of Federal Regulations, 2011 CFR
2011-10-01
... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...
50 CFR 18.114 - How do I obtain a Letter of Authorization?
Code of Federal Regulations, 2010 CFR
2010-10-01
... region described in § 18.112 that may cause the taking of Pacific walruses (walruses) or polar bears and... mitigate the effects of the proposed activity on walruses and polar bears encountered during the ongoing... bear awareness and interaction plan, i.e., a polar bear interaction plan. (4) A record of community...
33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans
Code of Federal Regulations, 2011 CFR
2011-07-01
... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...
33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans
Code of Federal Regulations, 2013 CFR
2013-07-01
... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...
33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans
Code of Federal Regulations, 2014 CFR
2014-07-01
... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...
33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans
Code of Federal Regulations, 2012 CFR
2012-07-01
... sections of the plan dealing with exercises, the spill management team, and the qualified individual. 1... mitigation measures— 2.2.5.1Ship salvage procedures; 2.2.5.2Damage stability; and 2.2.5.3Hull stress... and facility personnel to the spill management team. 2.2.7Familiarity with the operational...
Final Range Wide Environmental Impact Statement
2001-07-01
military presence at YPG protects natural resources by limiting access and activities, preventing or mitigating many impacts. The military presence in the...Pollution Prevention Plan; and Spill Prevention , Control and Countermeasures Plan (SPCCP). Environmental programs are responsible for...Act (CAA), PL 88-206 as amended, establishes National Ambient Air Quality Standards (NAAQS) for the control of criteria air pollutants to prevent
2010-01-01
Planning Chapters Chapter 5 provides DSCA planning factors for response to all hazard events. Chapter 6 is a review of safety and operational/composite...risk management processes. Chapters 7 through 11 contain the Concepts of Operation (CONOPS) and details five natural hazards /disasters and the...Restoring critical public services and facilities through temporary measures • Identifying hazard mitigation opportunities 3.3.1.5 Rehabilitation
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
The U.S. Department of Education's Office of Safe and Drug-Free Schools strongly encourages schools and school districts to develop emergency management plans within the context of the four phases of emergency management: prevention, mitigation, preparedness, response and recovery. In addition, schools should collaborate closely with police, fire…
Planning for a Violent Intruder Event: The School Nurse's Role.
Selekman, Janice; Melvin, Joseph
2017-05-01
School shootings occur too frequently and often with devastating results. The key to prevention and mitigation of these events is to have a plan that is simple, up-to-date, disseminated, and practiced. This article discusses the steps that school nurses can take to work with school administration to prepare themselves, their staff, and their students.