Initial Assessment of CSA Group Niobium Boron Based Coatings on 4340 Steel
2017-07-01
Technical Report ARWSB-TR-17026 Initial Assessment of CSA Group Niobium- Boron Based Coatings on 4340 Steel C.P. Mulligan...REPORT TYPE Technical 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Initial Assessment of CSA Group Niobium- Boron Based Coatings on 4340...metallographic mounts reported as (1) thin and (2) thick Niobium- Boron (Nb-B) type coatings on steel. CSA Group is interested in providing coatings for potential
DOT National Transportation Integrated Search
1996-06-01
Technical Operating Procedures (TOPS) for Providing Funding to Natural Resources : Trustees To Conduct An Initiation of Assessment of Natural Resource Damages : under the Oil Pollution Act of 1990 have been developed to provide guidance on : funding ...
ERIC Educational Resources Information Center
Mumford, Michael D.; And Others
A multivariate modeling approach was developed to assess the impact of changes in aptitude requirement minimums on U.S. Air Force technical training outcomes. Initially, interviews were conducted with technical training personnel to identify significant student inputs, course content, and training outcome variables. Measures of these variables…
The Effect of Technical Performance on Patient Outcomes in Surgery: A Systematic Review.
Fecso, Andras B; Szasz, Peter; Kerezov, Georgi; Grantcharov, Teodor P
2017-03-01
Systematic review of the effect of intraoperative technical performance on patient outcomes. The operating room is a high-stakes, high-risk environment. As a result, the quality of surgical interventions affecting patient outcomes has been the subject of discussion and research for years. MEDLINE, EMBASE, PsycINFO, and Cochrane databases were searched. All surgical specialties were eligible for inclusion. Data were reviewed in regards to the methods by which technical performance was measured, what patient outcomes were assessed, and how intraoperative technical performance affected patient outcomes. Quality of evidence was assessed using the Medical Education Research Study Quality Instrument (MERSQI). Of the 12,758 studies initially identified, 24 articles (7775 total participants) were ultimately included in this review. Seventeen studies assessed the performance of the faculty alone, 2 assessed both the faculty and trainees, 1 assessed trainees alone, and in 4 studies, the level of the operating surgeon was not specified. In 18 studies, a performance assessment tool was used. Patient outcomes were evaluated using intraoperative complications, short-term morbidity, long-term morbidity, short-term mortality, and long-term mortality. The average MERSQI score was 11.67 (range 9.5-14.5). Twenty-one studies demonstrated that superior technical performance was related to improved patient outcomes. The results of this systematic review demonstrated that superior technical performance positively affects patient outcomes. Despite this initial evidence, more robust research is needed to directly assess intraoperative technical performance and its effect on postoperative patient outcomes using meaningful assessment instruments and reliable processes.
The New Jersey Police Technical Assistance Program
DOT National Transportation Integrated Search
2007-03-01
The Police Technical Assistance Program (PTAP), a federal model, was adopted to support the New Jersey Department of Transportation (NJDOT)s safety mission. Several activities were included in this initiative: conducting assessments, providing tec...
The USEPA is leading an effort to develop technical documentation that provides the policy, scientific and technical framework for assessing the viability of MNA for inorganic contaminants in ground water (hereafter referred to as the Framework Document). Initial guidance on the...
2000-09-30
Burial Assessment State-of-the Art Science , Technology, and Modeling. A Review of Coastal Research, Modeling, and Naval Operational Needs in Shallow Water...the ONR Mine Burial Prediction Program are summarized below. 1) Completed comprehensive technical reports: a. Mine Burial Assessment, State-of-the Art ... Science , Technology, and Modeling. A review of Coastal Research, Modeling, and Naval Operational Needs in Shallow Water Environments with
ERIC Educational Resources Information Center
Tatzl, Dietmar; Hassler, Wolfgang; Messnarz, Bernd; Fluhr, Holger
2012-01-01
The present article describes and evaluates collaborative interdisciplinary group projects initiated by content lecturers and an English-as-a-Foreign-Language (EFL) instructor for the purpose of teaching technical writing skills in an aeronautical engineering degree program. The proposed technical writing model is assessed against the results of a…
Vision Zero San Francisco truck side guard initiative : technical assessment and recommendations
DOT National Transportation Integrated Search
2016-05-01
This report summarizes Volpes research and recommendations supporting San Francisco Municipal Transportation Agency (SFMTA) efforts to improve pedestrian and bicyclist safety through truck-based strategies. Specifically, this initial report focuse...
Are general surgeons able to accurately self-assess their level of technical skills?
Rizan, C; Ansell, J; Tilston, T W; Warren, N; Torkington, J
2015-11-01
Self-assessment is a way of improving technical capabilities without the need for trainer feedback. It can identify areas for improvement and promote professional medical development. The aim of this review was to identify whether self-assessment is an accurate form of technical skills appraisal in general surgery. The PubMed, MEDLINE(®), Embase(™) and Cochrane databases were searched for studies assessing the reliability of self-assessment of technical skills in general surgery. For each study, we recorded the skills assessed and the evaluation methods used. Common endpoints between studies were compared to provide recommendations based on the levels of evidence. Twelve studies met the inclusion criteria from 22,292 initial papers. There was no level 1 evidence published. All papers compared the correlation between self-appraisal versus an expert score but differed in the technical skills assessment and the evaluation tools used. The accuracy of self-assessment improved with increasing experience (level 2 recommendation), age (level 3 recommendation) and the use of video playback (level 3 recommendation). Accuracy was reduced by stressful learning environments (level 2 recommendation), lack of familiarity with assessment tools (level 3 recommendation) and in advanced surgical procedures (level 3 recommendation). Evidence exists to support the reliability of self-assessment of technical skills in general surgery. Several variables have been shown to affect the accuracy of self-assessment of technical skills. Future work should focus on evaluating the reliability of self-assessment during live operating procedures.
ERIC Educational Resources Information Center
Morrison, Julie Q.; Russell, Christine; Dyer, Stephanie; Metcalf, Terri; Rahschulte, Rebecca L.
2014-01-01
Despite the national proliferation of technical assistance as a driver for school reform and as a model for embedded and sustained professional development, very little is known about the organizational structures and processes needed to support technical assistance. The purpose of this paper is to describe a structured needs assessment process…
The USEPA is leading an effort to develop technical documentation that provides the policy, scientific and technical framework for assessing the viability of MNA for inorganic contaminants in ground water (hereafter referred to as the Framework Document). Initial guidance on the...
This document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
The document provides brownfields planners with an overview of the technical methods that can be used to achieve successful site assessment and cleanup which are two key components of the brownfields redevelopment process. No two brownfields sites are identical and planners will...
Initial Readability Assessment of Clinical Trial Eligibility Criteria
Kang, Tian; Elhadad, Noémie; Weng, Chunhua
2015-01-01
Various search engines are available to clinical trial seekers. However, it remains unknown how comprehensible clinical trial eligibility criteria used for recruitment are to a lay audience. This study initially investigated this problem. Readability of eligibility criteria was assessed according to (i) shallow and lexical characteristics through the use of an established, generic readability metric; (ii) syntactic characteristics through natural language processing techniques; and (iii) health terminological characteristics through an automated comparison to technical and lay health texts. We further stratified clinical trials according to various study characteristics (e.g., source country or study type) to understand potential factors influencing readability. Mainly caused by frequent use of technical jargons, a college reading level was found to be necessary to understand eligibility criteria text, a level much higher than the average literacy level of the general American population. The use of technical jargons should be minimized to simplify eligibility criteria text. PMID:26958204
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, Daniel; Berzins, Martin; Pennington, Robert
On November 19, 2014, the Advanced Scientific Computing Advisory Committee (ASCAC) was charged with reviewing the Department of Energy’s conceptual design for the Exascale Computing Initiative (ECI). In particular, this included assessing whether there are significant gaps in the ECI plan or areas that need to be given priority or extra management attention. Given the breadth and depth of previous reviews of the technical challenges inherent in exascale system design and deployment, the subcommittee focused its assessment on organizational and management issues, considering technical issues only as they informed organizational or management priorities and structures. This report presents the observationsmore » and recommendations of the subcommittee.« less
Assessing Technical Competence in Surgical Trainees: A Systematic Review.
Szasz, Peter; Louridas, Marisa; Harris, Kenneth A; Aggarwal, Rajesh; Grantcharov, Teodor P
2015-06-01
To systematically examine the literature describing the methods by which technical competence is assessed in surgical trainees. The last decade has witnessed an evolution away from time-based surgical education. In response, governing bodies worldwide have implemented competency-based education paradigms. The definition of competence, however, remains elusive, and the impact of these education initiatives in terms of assessment methods remains unclear. A systematic review examining the methods by which technical competence is assessed was conducted by searching MEDLINE, EMBASE, PsychINFO, and the Cochrane database of systematic reviews. Abstracts of retrieved studies were reviewed and those meeting inclusion criteria were selected for full review. Data were retrieved in a systematic manner, the validity and reliability of the assessment methods was evaluated, and quality was assessed using the Grading of Recommendations Assessment, Development and Evaluation classification. Of the 6814 studies identified, 85 studies involving 2369 surgical residents were included in this review. The methods used to assess technical competence were categorized into 5 groups; Likert scales (37), benchmarks (31), binary outcomes (11), novel tools (4), and surrogate outcomes (2). Their validity and reliability were mostly previously established. The overall Grading of Recommendations Assessment, Development and Evaluation for randomized controlled trials was high and low for the observational studies. The definition of technical competence continues to be debated within the medical literature. The methods used to evaluate technical competence predominantly include instruments that were originally created to assess technical skill. Very few studies identify standard setting approaches that differentiate competent versus noncompetent performers; subsequently, this has been identified as an area with great research potential.
Assessing the Validity of Air Force Selection and Training Strategies.
ERIC Educational Resources Information Center
Mumford, Michael D.; And Others
A study was undertaken to develop a system for predicting the impact of adjustments in aptitude requirements on outcomes (performance) in Air Force basic resident technical training. To accomplish this, a multivariate modeling approach was used. Initially, interviews were constructed within a variety of technical training programs to specify the…
INITIAL ASSESSMENT OF EMISSIONS FROM HEAT SETTING CARPET YARN
The report gives initial results of a project to determine the nature of emissions resulting from the heat setting of carpet yarn and to identify possible control options. To collect the necessary technical information, two manufacturing facilities were visited: World Carpets in ...
Republic of the Marshall Islands. Energy Project Development Options and Technical Assessment (2013)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, Misty Dawn; Olis, Dan; Ness, J. Erik
2015-09-01
The advancement of renewable energy and energy efficient technologies continues to be fluid. There are many technical opportunities and strategies that can be utilized to guide communities to deploy cost-effective commercial alternative energy options; however, to achieve aggressive economic, environmental, and security goals, it requires a comprehensive, integrated approach. This document reports on the initial findings of an energy assessment that was conducted for the Republic of the Marshall Islands.
INITIAL ASSESSMENT OF EMISSIONS FROM HEAT SETTING CARPET YARN
The report gives initial results of a project to determine the nature of emissions resulting from the heat setting of carpet yarn and to identify possible control options. o collect the necessary technical information, two manufacturing facilities were visited: World Carpets in D...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shoaf, C.R.; Guth, D.J.
The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1more » ref., 2 figs.« less
Alkhayal, Abdullah; Aldhukair, Shahla; Alselaim, Nahar; Aldekhayel, Salah; Alhabdan, Sultan; Altaweel, Waleed; Magzoub, Mohi Elden; Zamakhshary, Mohammed
2012-01-01
After almost a decade of implementing competency-based programs in postgraduate training programs, the assessment of technical skills remains more subjective than objective. National data on the assessment of technical skills during surgical training are lacking. We conducted this study to document the assessment tools for technical skills currently used in different surgical specialties, their relationship with remediation, the recommended tools from the program directors' perspective, and program directors' attitudes toward the available objective tools to assess technical skills. This study was a cross-sectional survey of surgical program directors (PDs). The survey was initially developed using a focus group and was then sent to 116 PDs. The survey contains demographic information about the program, the objective assessment tools used, and the reason for not using assessment tools. The last section discusses the recommended tools to be used from the PDs' perspective and the PDs' attitude and motivation to apply these tools in each program. The associations between the responses to the assessment questions and remediation were statistically evaluated. Seventy-one (61%) participants responded. Of the respondents, 59% mentioned using only nonstandardized, subjective, direct observation for technical skills assessment. Sixty percent use only summative evaluation, whereas 15% perform only formative evaluations of their residents, and the remaining 22% conduct both summative and formative evaluations of their residents' technical skills. Operative portfolios are kept by 53% of programs. The percentage of programs with mechanisms for remediation is 29% (19 of 65). The survey showed that surgical training programs use different tools to assess surgical skills competency. Having a clear remediation mechanism was highly associated with reporting remediation, which reflects the capability to detect struggling residents. Surgical training leadership should invest more in standardizing the assessment of surgical skills.
Moreau, Katherine A; Eady, Kaylee; Tang, Kenneth; Jabbour, Mona; Frank, Jason R; Campbell, Meaghan; Hamstra, Stanley J
2017-11-14
Parents can assess residents' non-technical skills (NTS) in pediatric emergency departments (EDs). There are no assessment tools, with validity evidence, for parental use in pediatric EDs. The purpose of this study was to develop the Parents' Assessment of Residents Enacting Non-Technical Skills (PARENTS) educational assessment tool and collect three sources of validity evidence (i.e., content, response process, internal structure) for it. We established content evidence for the PARENTS through interviews with physician-educators and residents, focus groups with parents, a literature review, and a modified nominal group technique with experts. We collected response process evidence through cognitive interviews with parents. To examine the internal structure evidence, we administered the PARENTS and performed exploratory factor analysis. Initially, a 20-item PARENTS was developed. Cognitive interviews led to the removal of one closed-ended item, the addition of resident photographs, and wording/formatting changes. Thirty-seven residents and 434 parents participated in the administration of the resulting 19-item PARENTS. Following factor analysis, a one-factor model prevailed. The study presents initial validity evidence for the PARENTS. It also highlights strategies for potentially: (a) involving parents in the assessment of residents, (b) improving the assessment of NTS in pediatric EDs, and (c) capturing parents' perspectives to improve the preparation of future physicians.
ERIC Educational Resources Information Center
Orsak, Charles G.; And Others
A Navarro College, Texas, study determined the quantitative and qualitative needs for developing skilled manpower for the solar industry and secondarily identified the (present) solar industry manpower populations and tasks performed by solar technical and skilled workers. Results from three initial working groups addressing equipment, market…
Dynamic Assessment: One Approach and Some Initial Data. Technical Report No. 361.
ERIC Educational Resources Information Center
Campione, Joseph C.; Brown, Ann L.
In an effort to validate dynamic assessment methods influenced by Vygotsky's (1978) definition of zones of proximal development (an indicator of readiness), three sets of experiments addressed two goals: the development of diagnostic assessment methods and the use of diagnostic results to guide the design of instructional programs. The first two…
Sevdalis, Nick; Undre, Shabnam; Henry, Janet; Sydney, Elaine; Koutantji, Mary; Darzi, Ara; Vincent, Charles A
2009-09-01
The recent emergence of the Systems Approach to the safety and quality of surgical care has triggered individual and team skills training modules for surgeons and anaesthetists and relevant observational assessment tools have been developed. To develop an observational tool that captures operating room (OR) nurses' technical skill and can be used for assessment and training. The Imperial College Assessment of Technical Skills for Nurses (ICATS-N) assesses (i) gowning and gloving, (ii) setting up instrumentation, (iii) draping, and (iv) maintaining sterility. Three to five observable behaviours have been identified for each skill and are rated on 1-6 scales. Feasibility and aspects of reliability and validity were assessed in 20 simulation-based crisis management training modules for trainee nurses and doctors, carried out in a Simulated Operating Room. The tool was feasible to use in the context of simulation-based training. Satisfactory reliability (Cronbach alpha) was obtained across trainers' and trainees' scores (analysed jointly and separately). Moreover, trainer nurse's ratings of the four skills correlated positively, thus indicating adequate content validity. Trainer's and trainees' ratings did not correlate. Assessment of OR nurses' technical skill is becoming a training priority. The present evidence suggests that the ICATS-N could be considered for use as an assessment/training tool for junior OR nurses.
2014 Version 7.0 Technical Support Document (TSD)
The 2014 Version 7 document describes the processing of emission inventories into inputs for the Community Multiscale Air Quality model for use in the 2014 National Air Toxics Assessment initial modeling.
ERIC Educational Resources Information Center
Radnor, Hilary
The Moderation and Assessment Project, South West, was an outgrowth of the Technical and Vocational Educational Initiative of the government of the United Kingdom that attempted to develop more courses with vocational relevance for adolescents. Growing from research projects under the Moderation and Assessment project, a new model of moderation is…
Liederbach, Marijeanne; Hagins, Marshall; Gamboa, Jennifer M; Welsh, Thomas M
2012-12-01
This technical report of the Standard Measures Consensus Initiative of the International Association for Dance Medicine and Science (IADMS) describes the results of the committee’s multi-year effort to synthesize information regarding the tests and measures used in dance-related research, protocols for reporting injuries, and appropriate use of available technologies to aid in standardizing such matters. Specific recommendations are presented, with accompanying rationales, to facilitate consensus among members of the dance medicine and science community. An Executive Summary of this Technical Report, which contains implementation strategies and appendices, should soon be available on the IADMS website.
USDA-ARS?s Scientific Manuscript database
The USDA initiated the Conservation Effects Assessment Project (CEAP) to quantify the environmental benefits of conservation practices at regional and national scales. For this assessment, a sampling and modeling approach is used. This paper provides a technical overview of the modeling approach use...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, Jochem W; Laird, Daniel; Costello, Ronan
This paper presents a comparative assessment of three fundamentally different wave energy converter technology development trajectories. The three technology development trajectories are expressed and visualised as a function of technology readiness levels and technology performance levels. The assessment shows that development trajectories that initially prioritize technology readiness over technology performance are likely to require twice the development time, consume a threefold of the development cost, and are prone to a risk of technical or commercial failure of one order of magnitude higher than those development trajectories that initially prioritize technology performance over technology readiness.
ERIC Educational Resources Information Center
Ward, William C.
The Open Field Test was used to assess variables that might not be manifested in a more standard testing situation. In this test, the child was shown 10 standard play objects in the room, and was told to do anything he wished with the toys. The tester initiated no interaction with the child and responded minimally to any overture made by the…
2017-03-13
support of airborne laser designator use during test and training exercises on military ranges. The initial MATILDA tool, MATILDA PRO Version-1.6.1...was based on the 2007 PRA model developed to perform range safety clearances for the UK Thermal Imaging Airborne Laser Designator (TIALD) system...AFRL Technical Reports. This Technical Report, designated Part I, con- tains documentation of the computational procedures for probabilistic fault
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these... guidance of Nuclear Energy Institute (NEI) 04-10, ``Risk-Informed Technical Specifications Initiative 5b...
NASA Technical Reports Server (NTRS)
Korsmeyer, David; Schreiner, John
2002-01-01
This technology evaluation report documents the findings and recommendations of the Engineering for Complex Systems Program (formerly Design for Safety) PRACA Enhancement Pilot Study of the Space Shuttle Program's (SSP's) Problem Reporting and Corrective Action (PRACA) System. A team at NASA Ames Research Center (ARC) performed this Study. This Study was initiated as a follow-on to the NASA chartered Shuttle Independent Assessment Team (SIAT) review (performed in the Fall of 1999) which identified deficiencies in the current PRACA implementation. The Pilot Study was launched with an initial qualitative assessment and technical review performed during January 2000 with the quantitative formal Study (the subject of this report) started in March 2000. The goal of the PRACA Enhancement Pilot Study is to evaluate and quantify the technical aspects of the SSP PRACA systems and recommend enhancements to address deficiencies and in preparation for future system upgrades.
Geoscientific Site Evaluation Approach for Canada's Deep Geological Repository for Used Nuclear Fuel
NASA Astrophysics Data System (ADS)
Sanchez-Rico Castejon, M.; Hirschorn, S.; Ben Belfadhel, M.
2015-12-01
The Nuclear Waste Management Organization (NWMO) is responsible for implementing Adaptive Phased Management, the approach selected by the Government of Canada for long-term management of used nuclear fuel generated by Canadian nuclear reactors. The ultimate objective of APM is the centralized containment and isolation of Canada's used nuclear fuel in a Deep Geological Repository in a suitable crystalline or sedimentary rock formation. In May 2010, the NWMO published and initiated a nine-step site selection process to find an informed and willing community to host a deep geological repository for Canada's used nuclear fuel. The site selection process is designed to address a broad range of technical and social, economic and cultural factors. The site evaluation process includes three main technical evaluation steps: Initial Screenings; Preliminary Assessments; and Detailed Site Characterizations, to assess the suitability of candidate areas in a stepwise manner over a period of many years. By the end of 2012, twenty two communities had expressed interest in learning more about the project. As of July 2015, nine communities remain in the site selection process. To date (July 2015), NWMO has completed Initial Screenings for the 22 communities that expressed interest, and has completed the first phase of Preliminary Assessments (desktop) for 20 of the communities. Phase 2 of the Preliminary Assessments has been initiated in a number of communities, with field activities such as high-resolution airborne geophysical surveys and geological mapping. This paper describes the approach, methods and criteria being used to assess the geoscientific suitability of communities currently involved in the site selection process.
Laparoscopic Ultrasound-Guided Radiofrequency Ablation of Uterine Fibroids
DOE Office of Scientific and Technical Information (OSTI.GOV)
Milic, Andrea; Asch, Murray R.; Hawrylyshyn, Peter A.
Four patients with symptomatic uterine fibroids measuring less than 6 cm underwent laparoscopic ultrasound-guided radiofrequency ablation (RFA) using multiprobe-array electrodes. Follow-up of the treated fibroids was performed with gadolinium-enhanced magnetic resonance imaging (MRI) and patients' symptoms were assessed by telephone interviews. The procedure was initially technically successful in 3 of the 4 patients and MRI studies at 1 month demonstrated complete fibroid ablation. Symptom improvement, including a decrease in menstrual bleeding and pain, was achieved in 2 patients at 3 months. At 7 months, 1 of these 2 patients experienced symptom worsening which correlated with recurrent fibroid on MRI. Themore » third, initially technically successfully treated patient did not experience any symptom relief after the procedure and was ultimately diagnosed with adenomyosis. Our preliminary results suggest that RFA is a technically feasible treatment for symptomatic uterine fibroids in appropriately selected patients.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, Michael T.; Diaz, Aaron A.; Cinson, Anthony D.
2014-03-24
PNNL conducted a technical assessment of the NDE issues and protocols that led to missed detections of several axially oriented flaws in a steam generator primary inlet dissimilar metal weld at North Anna Power Station, Unit 1 (NAPS-1). This particular component design exhibits a significant outside-diameter (OD) taper that is not included as a blind performance demonstration mock-up within the industry’s Performance Demonstration Initiative, administered by EPRI. For this reason, the licensee engaged EPRI to assist in the development of a technical justification to support the basis for a site-specific qualification. The service-induced flaws at NAPS-1 were eventually detected asmore » a result of OD surface machining in preparation for a full structural weld overlay. The machining operation uncovered the existence of two through-wall flaws, based on the observance of primary water leaking from the dissimilar metal weld. A total of five axially oriented flaws were detected in varied locations around the weld circumference. The field volumetric examination that was conducted at NAPS-1 was a non-encoded, real-time manual ultrasonic examination. PNNL conducted both an initial assessment, and subsequently, a more rigorous technical evaluation (reported here), which has identified an array of NDE issues that may have led to the subject missed detections. These evaluations were performed through technical reviews and discussions with NRC staff, EPRI NDE Center personnel, industry and ISI vendor personnel, and ultrasonic transducer manufacturers, and laboratory tests, to better understand the underlying issues at North Anna.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mosey, G.; Van Geet, O.
2010-12-01
This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on the Stringfellow Superfund Site in Riverside, California. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electric rate of $0.13/kWh and incentives offered by Southern California Edison under the California Solar Initiative. According to the assessment, a government-owned, ground-mounted PV system represents a technically and economically feasible option. The report recommends financing options that could assist in themore » implementation of such a system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
EPA has developed this guide to provide decision-makers, such as city planners, private sector developers, and other involved in redeveloping brownfields, with a better understanding of the technical issues involved in assessing and cleaning up iron and steel mill sites so they can make the most informed decisions possible. This overview of the technical process involved in assessing and cleaning up brownfields sites can assist planners in making decisions at various stages of the project. An understanding of land use and industrial processes conducted in the past at a site can help the planner to conceptualize the site and identifymore » likely areas of contamination that may require cleanup. Numerous resources are suggested to facilitate characterization of the site and consideration of cleanup technologies.« less
Our Nation's Travel: 1995 NPTS Early Results Report: Technical Appendix
DOT National Transportation Integrated Search
1997-01-01
The primary uses of the Nationwide Personal Transportation Survey (NPTS) data : are in gaining a better understanding of travel behavior. The data are used to : enable DOT officials to assess program initiatives, review programs and policies, : and p...
Hydrogen and Storage Initiatives at the NASA JSC White Sands Test Facility
NASA Technical Reports Server (NTRS)
Maes, Miguel; Woods, Stephen S.
2006-01-01
NASA WSTF Hydrogen Activities: a) Aerospace Test; b) System Certification & Verification; c) Component, System, & Facility Hazard Assessment; d) Safety Training Technical Transfer: a) Development of Voluntary Consensus Standards and Practices; b) Support of National Hydrogen Infrastructure Development.
2017-03-01
COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS by Lee A. White...WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS 5. FUNDING NUMBERS 6. AUTHOR(S) Lee A. White 7. PERFORMING...unlimited. AN ANALYSIS OF COSTS AND BENEFITS ASSOCIATED WITH INITIAL CONTRACTING TECHNICAL EDUCATION AND TRAINING FOR UNRESTRICTED MARINE OFFICERS
NASA Technical Reports Server (NTRS)
Dennehy, Cornelius J.
2010-01-01
The NASA Engineering and Safety Center (NESC), initially formed in 2003, is an independently funded NASA Program whose dedicated team of technical experts provides objective engineering and safety assessments of critical, high risk projects. The GN&C Technical Discipline Team (TDT) is one of fifteen such discipline-focused teams within the NESC organization. The TDT membership is composed of GN&C specialists from across NASA and its partner organizations in other government agencies, industry, national laboratories, and universities. This paper will briefly define the vision, mission, and purpose of the NESC organization. The role of the GN&C TDT will then be described in detail along with an overview of how this team operates and engages in its objective engineering and safety assessments of critical NASA projects. This paper will then describe selected recent experiences, over the period 2007 to present, of the GN&C TDT in which they directly performed or supported a wide variety of NESC assessments and consultations.
Wood, Nathan J.; Good, James W.; Goodwin, Robert F.
2002-01-01
Research suggests that the Pacific Northwest could experience catastrophic earthquakes and tsunamis in the near future, posing a significant threat to the numerous ports and harbors along the coast. A collaborative, multiagency initiative is underway to increase the resiliency of Pacific Northwest ports and harbors to these hazards, involving Oregon Sea Grant, Washington Sea Grant, the National Oceanic and Atmospheric Administration Coastal Services Center, and the U.S. Geological Survey Center for Science Policy. One element of this research, planning, and outreach initiative is a natural hazard mitigation and emergency preparedness planning process that combines technical expertise with local stakeholder values and perceptions. This paper summarizes and examines one component of the process, the vulnerability assessment methodology, used in the pilot port and harbor community of Yaquina River, Oregon, as a case study of assessing vulnerability at the local level. In this community, stakeholders were most concerned with potential life loss and other nonstructural vulnerability issues, such as inadequate hazard awareness, communication, and response logistics, rather than structural issues, such as damage to specific buildings or infrastructure.
2011-02-01
http://www.redhammer.se/tornado/index.html (3) Aircraft Design: A Conceptual Approach, Daniel P. Raymer , AIAA, 1992 (4) (5) Moran, J., Computational...Fluid Dynamics, Wiley & Sons, 1984. Notes on the Stability and Control of Tailless Airplanes, Robert T. Jones, NACA Technical Note No.837, December
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of... Initiative (NSSI)-- Science Technical Advisory Panel (STAP) will meet as indicated below. DATES: The meeting...
ERIC Educational Resources Information Center
Lewis, Morgan V.; Kosine, Natalie R.
2008-01-01
This publication provides background to inform the implementation of Programs of Study (POS) as required by grantees of funds authorized under the Carl D. Perkins Career and Technical Education Improvement Act of 2006. The report is a review of the evidence on the effectiveness of previous similar initiatives and an examination of the implications…
The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration
NASA Technical Reports Server (NTRS)
McGhee, D. S.
2006-01-01
Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful
Kwon, Young Ho; Kwon, Se Hwan; Oh, Joo Hyeong; Jeong, Kyung Hwan; Lee, Tae Won
2014-06-01
To assess the efficacy of fluoroscopic guide wire manipulation in patients with malfunctioning peritoneal dialysis (PD) catheters that were initially placed by interventional radiologists under fluoroscopic guidance. From January 2002 to April 2012, 52 patients (mean age, 52.8 y ± 2.10s; range, 12-79 y) with malfunctioning PD catheters in whom fluoroscopic guide wire manipulation was performed were retrospectively reviewed. Technical success, clinical success, and complications were evaluated. Technical success was defined as fluoroscopically verified, successful catheter repositioning and adequate dialysate drainage after the procedure. Clinical success was defined as maintenance of PD catheter function for at least 30 days after the manipulation. During the study period, 72 manipulations (68 initial manipulations and 4 remanipulations) for malfunctioning PD catheters were done. The technical success rate was 74% (50 of 68) for initial manipulations and 75% (3 of 4) for remanipulations. The overall clinical success rate was 47% (32 of 68) for initial manipulations and 0% (0 of 4) for remanipulations. The primary causes of catheter malfunction were extraluminal obstruction by omental wrapping or adhesions in 43 of 68 cases (63.2%) and catheter malposition in 25 of 68 (36.8%) cases. There were no procedure-related major complications. Fluoroscopic guide wire manipulation in patients with malfunctioning PD catheters initially placed by interventional radiologists is a simple procedure, an effective way of prolonging PD catheter life, and a recommended procedure before invasive surgical procedures. Copyright © 2014 SIR. Published by Elsevier Inc. All rights reserved.
Contemporary Business Administration Curricula
ERIC Educational Resources Information Center
Gleason, James R.
2006-01-01
The National Association of State Directors of Career Technical Education Consortium (NASDCTEc) career clusters initiative was designed to research and foster development of curicula and assessments for each of 16 broad occupational groupings known as career clusters. These clusters encompass a broad range of careers, ranging from agriculture to…
Development of a Mass Casualty Triage Performance Assessment Tool
2015-02-01
mass casualty triage and interviews with members of the unit, the triage assessment development involved three steps: (1) identification of key...Unlimited c. THIS PAGE Unlimited Unlimited Unclassified 35 19b. TELEPHONE NUMBER (include area code ) i Technical...in this report was initiated by ARI-FHRU to develop a prototype measure of performance for one of the three collective tasks identified in the
ERIC Educational Resources Information Center
Hackett, Paul T.; Hortman, J. William
2008-01-01
The work of Goleman (1998) in the area of Emotional Intelligence offers promise for the assessment and evaluation of leader behaviors not related to a technical skill set such as those related to finance, data analysis, curriculum alignment, law or strategic planning. Researchers at a West Central Georgia University initiated a project that…
Sargent, Katherine; Arons, Abigail; Standish, Marion; Brindis, Claire D.
2011-01-01
Objectives. The Community Action to Fight Asthma Initiative, a network of coalitions and technical assistance providers in California, employed an environmental justice approach to reduce risk factors for asthma in school-aged children. Policy advocacy focused on housing, schools, and outdoor air quality. Technical assistance partners from environmental science, policy advocacy, asthma prevention, and media assisted in advocacy. An evaluation team assessed progress and outcomes. Methods. A theory of change and corresponding logic model were used to document coalition development and successes. Site visits, surveys, policymaker interviews, and participation in meetings documented the processes and outcomes. Quantitative and qualitative data were analyzed to assess strategies, successes, and challenges. Results. Coalitions, working with community residents and technical assistance experts, successfully advocated for policies to reduce children's exposures to environmental triggers, particularly in low-income communities and communities of color. Policies were implemented at various levels. Conclusions. Environmental justice approaches to policy advocacy could be an effective strategy to address inequities across communities. Strong technical assistance, close community involvement, and multilevel strategies were all essential to effective policies to reduce environmental inequities. PMID:21836108
1982-06-01
PRECOMMISSIONING LEVEL LEADERSHIP AND MANAGEMENT TECHNICAL AREA j~~t SIECP NOV 30 1983 U.S.ARMYRESERCHISTIUTEO STAThMEN EAVOA dSCILCENS 14’ 4..3...different fro Repo") 1IL SUPPLEMENTARY NOTES 19. KEMY WORDS (Cmntii’uen reyes old@ I n.eeemsa mul Idefltl by block nmbei~r) Army ROTC Management skills...performed by personnel from the Leadership and Management Technical Area under Army Project 2Q- 263731A792, in response to special requirements of the
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hey, Tony; Agarwal, Deborah; Borgman, Christine
The Advanced Scientific Computing Advisory Committee (ASCAC) was charged to form a standing subcommittee to review the Department of Energy’s Office of Scientific and Technical Information (OSTI) and to begin by assessing the quality and effectiveness of OSTI’s recent and current products and services and to comment on its mission and future directions in the rapidly changing environment for scientific publication and data. The Committee met with OSTI staff and reviewed available products, services and other materials. This report summaries their initial findings and recommendations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Preston, Benjamin L
2012-01-01
Technical assessments of vulnerability and/or risk are increasingly being undertaken to assess the impacts of climate change. Underlying this is the belief that they will bring clarity to questions regarding the scale of institutional investments required, plausible adaptation policies and measures, and the timing of their implementation. Despite the perceived importance of technical assessments in 'evidence-based' decision environments, assessments cannot be undertaken independent of values and politics, nor are they capable of eliminating the uncertainty that clouds decision-making on climate adaptation As such, assessments can trigger as many questions as they answer, leaving practitioners and stakeholders to question their value.more » This paper explores the value of vulnerability/risk assessments in climate change adaptation planning processes as a catalyst for learning in four case studies in Southeastern Australia. Data were collected using qualitative interviews with stakeholders involved in the assessments and analysed using a social learning framework. This analysis revealed that detailed and tangible strategies or actions often do not emerge directly from technical assessments. However, it also revealed that the assessments became important platforms for social learning. In providing these platforms, assessments present opportunities to question initial assumptions, explore multiple framings of an issue, generate new information, and galvanise support for collective actions. This study highlights the need for more explicit recognition and understanding of the important role social learning plays in climate change vulnerability assessments and adaptation planning more broadly.« less
Technical Excellence: A Requirement for Good Engineering
NASA Technical Reports Server (NTRS)
Gill, Paul S.; Vaughan, William W.
2008-01-01
Technical excellence is a requirement for good engineering. Technical excellence has many different ways of expressing itself within engineering. NASA has initiatives that address the enhancement of the Agency's technical excellence and thrust to maintain the associated high level of performance by the Agency on current programs/projects and as it moves into the Constellation Program and the return to the Moon with plans to visit Mars. This paper addresses some of the key initiatives associated with NASA's technical excellence thrust. Examples are provided to illustrate some results being achieved and plans to enhance these initiatives.
An Infrastructure for Web-Based Computer Assisted Learning
ERIC Educational Resources Information Center
Joy, Mike; Muzykantskii, Boris; Rawles, Simon; Evans, Michael
2002-01-01
We describe an initiative under way at Warwick to provide a technical foundation for computer aided learning and computer-assisted assessment tools, which allows a rich dialogue sensitive to individual students' response patterns. The system distinguishes between dialogues for individual problems and the linking of problems. This enables a subject…
48 CFR 1352.215-74 - Best value evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... integrated assessment of price/cost and non-price evaluation factors, to provide the best value to the... ensure that their initial proposal constitutes their best offer in terms of both price and the technical... at which an efficient competition can be conducted, the Contracting Officer may limit the number of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, Christopher F.; Rapko, Brian M.; Serne, R. Jeffrey
2014-03-03
The U.S. Department of Energy Office of Environmental Management (EM) is engaging the national laboratories to provide the scientific and technological rigor to support EM program and project planning, technology development and deployment, project execution, and assessment of program outcomes. As an early demonstration of this new responsibility, Pacific Northwest National Laboratory (PNNL) and Savannah River National Laboratory (SRNL) were chartered to implement a science and technology program addressing low-temperature waste forms for immobilization of DOE aqueous waste streams, including technetium removal as an implementing technology. As a first step, the laboratories examined the technical risks and uncertainties associated withmore » the Cast Stone waste immobilization and technetium removal projects at Hanford. Science and technology gaps were identified for work associated with 1) conducting performance assessments and risk assessments of waste form and disposal system performance, and 2) technetium chemistry in tank wastes and separation of technetium from waste processing streams. Technical approaches to address the science and technology gaps were identified and an initial sequencing priority was suggested. A subset of research was initiated in 2013 to begin addressing the most significant science and technology gaps. The purpose of this paper is to report progress made towards closing these gaps and provide notable highlights of results achieved to date.« less
1994-07-01
Public Release; Distribution Is Unlimited DTXC QtTAu r V94 8 Prepared for Headquarters, U.S. Army Corps of Engineers National Maglev Initiative and U.S...for public release; distribution is unlimited Prepared for Headquarters, U.S. Army Corps of Engineers Washington, DC 20314-1000 National Maglev ...Corps of Engineers, National Maglev Initiative, and U.S. Army Engineer Division, Huntsville. 73 p. : ill. ; 28 cm. - (Technical report ; SL-94-1 5
Career Technical Education Pathways Initiative Annual Report
ERIC Educational Resources Information Center
California Community Colleges, Chancellor's Office, 2014
2014-01-01
California's education system--the largest in the United States--is an essential resource for ensuring strong economic growth in the state. The Career Technical Education Pathways Initiative (the Initiative) became law in 2005 with Senate Bills 70 and 1133 and provided more than $380 million over eight years to improve career technical education…
High Energy Laser Technology Assessment: Volume 1. The Technology Assessment: An Initial Study
1975-01-01
technically feasible and economically cost effective Such an analysis is beyord the capability of this exploratory study Therefore, to proceed with... Analysis R&D Management fffft jygJfQ JQ Q^^ 20 ABSTRACT fConllnu* im r«»«ra« •!«#• II ifcmmnmrr mt4 Idtmllty hf Heck A technology assessment ha...by an abreviated impact analysis whose intent is to be illustrative of the methodology, rather than be a comprehensive treatment of the subject. 00
Digital imaging technology assessment: Digital document storage project
NASA Technical Reports Server (NTRS)
1989-01-01
An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.
Hardy, Jean-Baptiste; Gouin, Antoine; Damm, Cédric; Compère, Vincent; Veber, Benoît; Dureuil, Bertrand
2018-02-01
Anaesthesiologists may occasionally manage life-threatening operating room (OR) emergencies. Managing OR emergencies implies real-time analysis of often complicated situations, prompt medical knowledge retrieval, coordinated teamwork and effective decision making in stressful settings. Checklists are recommended to improve performance and reduce the risk of medical errors. This study aimed to assess the usefulness of the French Society of Anaesthesia and Intensive Care's (SFAR) "Malignant Hyperthermia" (MH) checklist on a simulated episode of MH crisis and management thereof by registered anesthesiologists. Twenty-four anaesthesiologists were allocated to 2 groups (checklist and control). Their technical performance in adherence with the SFAR guidelines was assessed by a 30-point score and their non-technical performance was assessed by the Anaesthetists' Non-Technical Skills (ANTS) score. Every task completion was assessed independently. Data are shown as median (first-third quartiles). Anaesthesiologists in the checklist group had higher technical performance scores (24/30 (21.5-25) vs 18/30 (15.5-19.5), P=0.002) and ANTS scores (56.5/60 (47.5-58) vs 48.5/60 (41-50.5), P=0.024). They administered the complete initial dose of dantrolene (2mg/kg) more quickly (15.7 minutes [13.9-18.3] vs 22.4 minutes [18.6-25]) than the control group (P=0.017). However, anaesthesiologists deemed the usability of the checklist to be perfectible. Registered anaesthesiologists' use of the MH checklist during a simulation session widely improved their adherence to guidelines and non-technical skills. This study strongly suggests the benefit of checklist tools for emergency management. Notwithstanding, better awareness and training for anaesthesiologists could further improve the use of this tool. Copyright © 2017 Société française d'anesthésie et de réanimation (Sfar). Published by Elsevier Masson SAS. All rights reserved.
NASA's post-Challenger safety program - Themes and thrusts
NASA Technical Reports Server (NTRS)
Rodney, G. A.
1988-01-01
The range of managerial, technical, and procedural initiatives implemented by NASA's post-Challenger safety program is reviewed. The recommendations made by the Rogers Commission, the NASA post-Challenger review of Shuttle design, the Congressional investigation of the accident, the National Research Council, the Aerospace Safety Advisory Panel, and NASA internal advisory panels and studies are summarized. NASA safety initiatives regarding improved organizational accountability for safety, upgraded analytical techniques and methodologies for risk assessment and management, procedural initiatives in problem reporting and corrective-action tracking, ground processing, maintenance documentation, and improved technologies are discussed. Safety issues relevant to the planned Space Station are examined.
The DELTA PREP Initiative" Accelerating Coalition Capacity for Intimate Partner Violence Prevention
ERIC Educational Resources Information Center
Zakocs, Ronda; Freire, Kimberley E.
2015-01-01
Background: The DELTA PREP Project aimed to build the prevention capacity of 19 state domestic violence coalitions by offering eight supports designed to promote prevention integration over a 3-year period: modest grant awards, training events, technical assistance, action planning, coaching hubs, the Coalition Prevention Capacity Assessment, an…
Quality Rating Systems--The Experiences of Center Directors
ERIC Educational Resources Information Center
Friedman, Dana E.
2007-01-01
Quality Rating System (QRS) initiatives define levels of quality based on research and then support providers with funding and technical assistance to increase their quality. Each program is assessed and given a number of "stars" to indicate to parents what level of quality the program has reached. In this article, the author describes…
Accomplishments and challenges of surgical simulation.
Satava, R M
2001-03-01
For nearly a decade, advanced computer technologies have created extraordinary educational tools using three-dimensional (3D) visualization and virtual reality. Pioneering efforts in surgical simulation with these tools have resulted in a first generation of simulators for surgical technical skills. Accomplishments include simulations with 3D models of anatomy for practice of surgical tasks, initial assessment of student performance in technical skills, and awareness by professional societies of potential in surgical education and certification. However, enormous challenges remain, which include improvement of technical fidelity, standardization of accurate metrics for performance evaluation, integration of simulators into a robust educational curriculum, stringent evaluation of simulators for effectiveness and value added to surgical training, determination of simulation application to certification of surgical technical skills, and a business model to implement and disseminate simulation successfully throughout the medical education community. This review looks at the historical progress of surgical simulators, their accomplishments, and the challenges that remain.
Sustainable hydropower in Lower Mekong Countries: Technical assessment and training travel report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hadjerioua, Boualem; Witt, Adam M.
The U.S. Agency for International Development (USAID), through their partnership with the U.S. Department of the Interior (DOI), requested the support of Oak Ridge National Laboratory (ORNL) to provide specialized technical assistance as part of the Smart Infrastructure for the Mekong (SIM) Program in Thailand. Introduced in July 2013 by U.S. Secretary of State John Kerry, SIM is a U.S. Government Inter-Agency program that provides Lower Mekong partner countries with targeted, demand-driven technical and scientific assistance to support environmentally sound, climate conscious and socially equitable infrastructure, clean energy development, and water resources optimization. The U.S. Government is committed to supportingmore » sustainable economic development within the region by providing tools, best practices, technical assistance, and lessons learned for the benefit of partner countries. In response to a request from the Electricity Generating Authority of Thailand (EGAT), a SIM project was developed with two main activities: 1) to promote hydropower sustainability and efficiency through technical assessment training at two existing hydropower assets in Thailand, and 2) the design and implementation of one national and two or three regional science and policy workshops, to be co-hosted with EGAT, to build common understanding of and commitment to environmental and social safeguards for Mekong Basin hydropower projects. The U.S. Department of Energy (DOE) is leading the technical assessment (Activity 1), and has contracted ORNL to provide expert technical assistance focused on increasing efficiency at existing projects, with the goal of increasing renewable energy generation at little to no capital cost. ORNL is the leading national laboratory in hydropower analysis, with a nationally recognized and highly qualified team of scientists addressing small to large-scale systems (basin-, regional-, and national-scale) energy generation optimization analysis for DOE. The mission of the ORNL Water Power Program is to develop technologies, decision-support tools, and methods of analysis that enable holistic management of water-dependent energy infrastructure and natural resources in support of the DOE Energy Efficiency and Renewable Energy Office (DOE-EERE), Federal hydropower agencies, Federal Energy Regulatory Commission (FERC), Nuclear Regulatory Commission (NRC), energy producers, and other entities. In support of SIM, ORNL completed technical assessments of two hydropower plants owned and operated by the Electricity Generating Authority of Thailand (EGAT): Vajiralongkorn (VRK), with an installed capacity of 300 MW, and Rajjaprabha (RPB), with an installed capacity of 240MW. Technical assessment is defined as the assessment of hydropower operation and performance, and the identification of potential opportunities for performance improvement through plant optimization. At each plant, the assessment included an initial analysis of hydropower operating and performance metrics, provided by dam owners. After this analysis, ORNL engaged with the plant management team in a skills exchange, where best practices, operational methods, and technical challenges were discussed. The technical assessment process was outlined to plant management followed by a presentation of preliminary results and analysis based on 50 days of operational data. EGAT has agreed to provide a full year of operational data so a complete and detailed assessment that captures seasonal variability can be completed. The results of these assessments and discussions will be used to develop a set of best practices, training, and procedure recommendations to improve the efficiency of the two assessed plants« less
Technical assessment of maglev system concepts. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lever, J.H.
1998-10-01
The Government Maglev System Assessment Team operated from 1991 to 1993 as part of the National Maglev Initiative. They assessed the technical viability of four US Maglev system concepts, using the French TGV high speed train and the German TR07 Maglev system as assessment baselines. Maglev in general offers advantages that include high speed potential, excellent system control, high capacity, low energy consumption, low maintenance, modest land requirements, low operating costs, and ability to meet a variety of transportation missions. Further, the US Maglev concepts could provide superior performance to TR07 for similar cost or similar performance for less cost.more » They also could achieve both lower trip times and lower energy consumption along typical US routes. These advantages result generally from the use of large gap magnetic suspensions, more powerful linear synchronous motors and tilting vehicles. Innovative concepts for motors, guideways, suspension, and superconducting magnets all contribute to a potential for superior long term performance of US Maglev systems compared with TGV and TR07.« less
The Global Tsunami Model (GTM)
NASA Astrophysics Data System (ADS)
Thio, H. K.; Løvholt, F.; Harbitz, C. B.; Polet, J.; Lorito, S.; Basili, R.; Volpe, M.; Romano, F.; Selva, J.; Piatanesi, A.; Davies, G.; Griffin, J.; Baptista, M. A.; Omira, R.; Babeyko, A. Y.; Power, W. L.; Salgado Gálvez, M.; Behrens, J.; Yalciner, A. C.; Kanoglu, U.; Pekcan, O.; Ross, S.; Parsons, T.; LeVeque, R. J.; Gonzalez, F. I.; Paris, R.; Shäfer, A.; Canals, M.; Fraser, S. A.; Wei, Y.; Weiss, R.; Zaniboni, F.; Papadopoulos, G. A.; Didenkulova, I.; Necmioglu, O.; Suppasri, A.; Lynett, P. J.; Mokhtari, M.; Sørensen, M.; von Hillebrandt-Andrade, C.; Aguirre Ayerbe, I.; Aniel-Quiroga, Í.; Guillas, S.; Macias, J.
2016-12-01
The large tsunami disasters of the last two decades have highlighted the need for a thorough understanding of the risk posed by relatively infrequent but disastrous tsunamis and the importance of a comprehensive and consistent methodology for quantifying the hazard. In the last few years, several methods for probabilistic tsunami hazard analysis have been developed and applied to different parts of the world. In an effort to coordinate and streamline these activities and make progress towards implementing the Sendai Framework of Disaster Risk Reduction (SFDRR) we have initiated a Global Tsunami Model (GTM) working group with the aim of i) enhancing our understanding of tsunami hazard and risk on a global scale and developing standards and guidelines for it, ii) providing a portfolio of validated tools for probabilistic tsunami hazard and risk assessment at a range of scales, and iii) developing a global tsunami hazard reference model. This GTM initiative has grown out of the tsunami component of the Global Assessment of Risk (GAR15), which has resulted in an initial global model of probabilistic tsunami hazard and risk. Started as an informal gathering of scientists interested in advancing tsunami hazard analysis, the GTM is currently in the process of being formalized through letters of interest from participating institutions. The initiative has now been endorsed by the United Nations International Strategy for Disaster Reduction (UNISDR) and the World Bank's Global Facility for Disaster Reduction and Recovery (GFDRR). We will provide an update on the state of the project and the overall technical framework, and discuss the technical issues that are currently being addressed, including earthquake source recurrence models, the use of aleatory variability and epistemic uncertainty, and preliminary results for a probabilistic global hazard assessment, which is an update of the model included in UNISDR GAR15.
The Global Tsunami Model (GTM)
NASA Astrophysics Data System (ADS)
Lorito, S.; Basili, R.; Harbitz, C. B.; Løvholt, F.; Polet, J.; Thio, H. K.
2017-12-01
The tsunamis occurred worldwide in the last two decades have highlighted the need for a thorough understanding of the risk posed by relatively infrequent but often disastrous tsunamis and the importance of a comprehensive and consistent methodology for quantifying the hazard. In the last few years, several methods for probabilistic tsunami hazard analysis have been developed and applied to different parts of the world. In an effort to coordinate and streamline these activities and make progress towards implementing the Sendai Framework of Disaster Risk Reduction (SFDRR) we have initiated a Global Tsunami Model (GTM) working group with the aim of i) enhancing our understanding of tsunami hazard and risk on a global scale and developing standards and guidelines for it, ii) providing a portfolio of validated tools for probabilistic tsunami hazard and risk assessment at a range of scales, and iii) developing a global tsunami hazard reference model. This GTM initiative has grown out of the tsunami component of the Global Assessment of Risk (GAR15), which has resulted in an initial global model of probabilistic tsunami hazard and risk. Started as an informal gathering of scientists interested in advancing tsunami hazard analysis, the GTM is currently in the process of being formalized through letters of interest from participating institutions. The initiative has now been endorsed by the United Nations International Strategy for Disaster Reduction (UNISDR) and the World Bank's Global Facility for Disaster Reduction and Recovery (GFDRR). We will provide an update on the state of the project and the overall technical framework, and discuss the technical issues that are currently being addressed, including earthquake source recurrence models, the use of aleatory variability and epistemic uncertainty, and preliminary results for a probabilistic global hazard assessment, which is an update of the model included in UNISDR GAR15.
The Global Tsunami Model (GTM)
NASA Astrophysics Data System (ADS)
Løvholt, Finn
2017-04-01
The large tsunami disasters of the last two decades have highlighted the need for a thorough understanding of the risk posed by relatively infrequent but disastrous tsunamis and the importance of a comprehensive and consistent methodology for quantifying the hazard. In the last few years, several methods for probabilistic tsunami hazard analysis have been developed and applied to different parts of the world. In an effort to coordinate and streamline these activities and make progress towards implementing the Sendai Framework of Disaster Risk Reduction (SFDRR) we have initiated a Global Tsunami Model (GTM) working group with the aim of i) enhancing our understanding of tsunami hazard and risk on a global scale and developing standards and guidelines for it, ii) providing a portfolio of validated tools for probabilistic tsunami hazard and risk assessment at a range of scales, and iii) developing a global tsunami hazard reference model. This GTM initiative has grown out of the tsunami component of the Global Assessment of Risk (GAR15), which has resulted in an initial global model of probabilistic tsunami hazard and risk. Started as an informal gathering of scientists interested in advancing tsunami hazard analysis, the GTM is currently in the process of being formalized through letters of interest from participating institutions. The initiative has now been endorsed by the United Nations International Strategy for Disaster Reduction (UNISDR) and the World Bank's Global Facility for Disaster Reduction and Recovery (GFDRR). We will provide an update on the state of the project and the overall technical framework, and discuss the technical issues that are currently being addressed, including earthquake source recurrence models, the use of aleatory variability and epistemic uncertainty, and preliminary results for a probabilistic global hazard assessment, which is an update of the model included in UNISDR GAR15.
Needle, Richard H; Trotter, Robert T; Singer, Merrill; Bates, Christopher; Page, J Bryan; Metzger, David; Marcelin, Louis H
2003-06-01
The US Department of Health and Human Services, in collaboration with the Congressional Black Caucus, created a new initiative to address the disproportionate ongoing HIV/AIDS crisis in racial/ethnic minority populations. This initiative included deploying technical assistance teams through the Office of HIV/AIDS Policy. The teams introduced rapid assessment and response methodologies and trained minority communities in their use. The first 3 eligible cities (Detroit, Miami, and Philadelphia) focused assessments in small geographic areas, using multiple methodologies to obtain data. Data from the first 3 eligible cities provided critical information about changing the dynamics of the HIV/AIDS epidemic at the local level, including program and policy changes and infrastructure redeployment targeted at the most serious social and environmental conditions.
CO2 sequestration: Storage capacity guideline needed
Frailey, S.M.; Finley, R.J.; Hickman, T.S.
2006-01-01
Petroleum reserves are classified for the assessment of available supplies by governmental agencies, management of business processes for achieving exploration and production efficiency, and documentation of the value of reserves and resources in financial statements. Up to the present however, the storage capacity determinations made by some organizations in the initial CO2 resource assessment are incorrect technically. New publications should thus cover differences in mineral adsorption of CO2 and dissolution of CO2 in various brine waters.
ERIC Educational Resources Information Center
Bregendahl, Corry; Flora, Cornelia
A combined outreach and research initiative addressed the participation of Native American business owners in electronic commerce. E-commerce can provide many benefits to producers and consumers but does not ensure unmitigated economic success. It is only one part of a development process leading to achievement of tribes' broader social goals,…
ERIC Educational Resources Information Center
Gonzalez, Gabriella; Le, Vi-Nhuan; Broer, Markus; Mariano, Louis T.; Froemel, J. Enrique; Goldman, Charles A.; DaVanzo, Julie
2009-01-01
Qatar has recently positioned itself to be a leader in education. Central to the country's efforts is the implementation of reforms to its K-12 education system. Central to the reform initiatives was the development of internationally benchmarked curriculum standards in four subjects: Arabic, English as a foreign language, mathematics, and…
The Effects of Varying Schedules of Incentive Delivery on Technical Training.
ERIC Educational Resources Information Center
Pritchard, Robert D.; And Others
The research reported here was initiated and designed to assess the impact of various schedules of incentive delivery (schedules of reinforcement) on performance and attitudes in an Air Force-related setting. Civilian subjects matching the characteristics of Air Force trainees were hired to work for four weeks, one week under each of four…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
... of key Departmental objectives, including but not limited to, energy efficiency and green building... Awards for the Technical Assistance and Capacity Building under the Transformation Initiative Program...) for the Technical Assistance and Capacity Building under the Transformation Initiative program for...
A proposal for risk sharing in the development of a lunar oxygen plant
NASA Technical Reports Server (NTRS)
Duke, Michael B.; Treadwell, Mead
1990-01-01
The production of lunar oxygen for use in a NASA lunar outpost program could provide a profitable investment for nongovernment development, savings for government, and an initiation of a new resource of capital financing for space industrialization. A joint endeavor to share development risks between government and nongovernment investment is proposed, based on some early assessments of technical and financial feasibility for the project. Successful initial negotiations between government and nongovernment investors can establish the requirements for financing the project with private funds.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Post, M. B.; Burgess, R.; Rivkin, C.
2012-09-01
Automobile manufacturers in North America, Europe, and Asia project a 2015 release of commercial hydrogen fuel cell powered light-duty road vehicles. These vehicles will be for general consumer applications, albeit initially in select markets but with much broader market penetration expected by 2025. To assure international harmony, North American, European, and Asian regulatory representatives are striving to base respective national regulations on an international safety standard, the Global Technical Regulation (GTR), Hydrogen Fueled Vehicle, which is part of an international agreement pertaining to wheeled vehicles and equipment for wheeled vehicles.
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2011-09-01
This report covers an assessment of 182 different heating, ventilation, and air-conditioning (HVAC) technologies for U.S. commercial buildings to identify and provide analysis on 17 priority technology options in various stages of development. The analyses include an estimation of technical energy-savings potential, description of technical maturity, description of non-energy benefits, description of current barriers for market adoption, and description of the technology’s applicability to different building or HVAC equipment types. From these technology descriptions, are suggestions for potential research, development and demonstration (RD&D) initiatives that would support further development of the priority technology options.
Nayahangan, L J; Konge, L; Schroeder, T V; Paltved, C; Lindorff-Larsen, K G; Nielsen, B U; Eiberg, J P
2017-04-01
Practical skills training in vascular surgery is facing challenges because of an increased number of endovascular procedures and fewer open procedures, as well as a move away from the traditional principle of "learning by doing." This change has established simulation as a cornerstone in providing trainees with the necessary skills and competences. However, the development of simulation based programs often evolves based on available resources and equipment, reflecting convenience rather than a systematic educational plan. The objective of the present study was to perform a national needs assessment to identify the technical procedures that should be integrated in a simulation based curriculum. A national needs assessment using a Delphi process was initiated by engaging 33 predefined key persons in vascular surgery. Round 1 was a brainstorming phase to identify technical procedures that vascular surgeons should learn. Round 2 was a survey that used a needs assessment formula to explore the frequency of procedures, the number of surgeons performing each procedure, risk and/or discomfort, and feasibility for simulation based training. Round 3 involved elimination and ranking of procedures. The response rate for round 1 was 70%, with 36 procedures identified. Round 2 had a 76% response rate and resulted in a preliminary prioritised list after exploring the need for simulation based training. Round 3 had an 85% response rate; 17 procedures were eliminated, resulting in a final prioritised list of 19 technical procedures. A national needs assessment using a standardised Delphi method identified a list of procedures that are highly suitable and may provide the basis for future simulation based training programs for vascular surgeons in training. Copyright © 2017 European Society for Vascular Surgery. Published by Elsevier Ltd. All rights reserved.
Silva, Marcus Tolentino; de Almeida, Rosimary Terezinha; Gava, Cintia Maria; Galvão, Taís Freire; da Silva, Edina Mariko Koga; Santos, Vania Cristina Canuto; Ronchini, Misani Akiko Kanamota; de Mesquita, Aline Monte; Elias, Flávia Tavares Silva; d'Oliveira, Alexandre Lemgruber Portugal; Atallah, Alvaro Nagib
2012-01-01
This study reports on the Brazilian experience of developing a specialized bulletin, the Brazilian Health Technology Assessment Bulletin (BRATS), on health technology assessments (HTA). The editorial process, format, and dissemination strategy of the publication are presented. A critical appraisal of the available issues was made using the checklist for HTA reports of the International Network of Agencies for Health Technology Assessment. The initial impact was estimated based on a retrospective observational measurement of the types of publications that cite the bulletin as a source of information. The publications citing BRATS were identified using Google Scholar. Since June 2008, fourteen issues of the bulletin have been produced. BRATS has not presented any significant limitation that would compromise generalizations of its results within the Brazilian context. The initial impact of the bulletin, however, has been small, which may be due to its exclusively electronic dissemination format and technical language. We found nine publications citing BRATS in Google Scholar. It is hoped that the bulletin will promote the continuity of HTA actions among health-sector managers and professionals in Brazil.
Weaver, J; Leon, E; Edan, M; D'Alessio, F
2012-08-01
The World Organisation for Animal Health (OIE) carries out Gap Analysis missions (if a country so wishes) as part of its programme to assess and improve the Performance of Veterinary Services (the 'PVS Pathway') in Member Countries. These Gap Analysis missions have found that many national Veterinary Services comply to only a limited extent with the international standards established by the OIE and that their competence is compromised by poor governance. This failure threatens animal and public health not only nationally but also internationally. The OIE PVS Gap Analysis reports reviewed found that all the Veterinary Services have a strong vision and commitmentto improvement but are held back by a weak chain of command, inadequate and outdated legislation, insufficient funding, weak technical competencies, compromised technical independence, poor communications and limited joint programmes. There are weaknesses across all the core technical areas of trade, animal health, veterinary public health and veterinary laboratories and also in the overall management of the Veterinary Services. The OIE PVS Gap Analysis missions recommend significant increases in budget in all countries.
Needle, Richard H.; Trotter, Robert T.; Singer, Merrill; Bates, Christopher; Page, J. Bryan; Metzger, David; Marcelin, Louis H.
2003-01-01
Objectives. The US Department of Health and Human Services, in collaboration with the Congressional Black Caucus, created a new initiative to address the disproportionate ongoing HIV/AIDS crisis in racial/ethnic minority populations. Methods. This initiative included deploying technical assistance teams through the Office of HIV/AIDS Policy. The teams introduced rapid assessment and response methodologies and trained minority communities in their use. Results. The first 3 eligible cities (Detroit, Miami, and Philadelphia) focused assessments in small geographic areas, using multiple methodologies to obtain data. Conclusions. Data from the first 3 eligible cities provided critical information about changing the dynamics of the HIV/AIDS epidemic at the local level, including program and policy changes and infrastructure redeployment targeted at the most serious social and environmental conditions. PMID:12773364
Fouilloux, V; Doguet, F; Kotsakis, A; Dubrowski, A; Berdah, S
2015-03-01
To develop a standardized simulation-based curriculum to teach medical knowledge and technical, communication and critical thinking skills necessary to initiate and wean from cardiopulmonary bypass (CPB) to junior cardiac trainees (CTs) in France. Performance on post-curricular tests was compared between CTs who participated in the new curriculum to those who did not. The simulation-based curriculum was developed by content and education experts. Simulations sequentially taught the skills necessary for initiating and weaning from CPB as well as managing crises by adding fidelity and complexity to scenarios. Nine CTs were randomly assigned to the new curriculum (n=5) or the traditional curriculum (n=4). Skills were assessed using tests of medical knowledge and technical, communication (GRS) and critical thinking (SCT) skills. A two-sample Wilcoxon rank-sum test compared average scores between the two groups. Alpha of 0.05 was set to indicate statistically significant differences. The resutls revealed that CTs in the new curriculum significantly outperformed CTs in the traditional curriculum on technical (18.2 vs 14.8, p=0.05) and communication (3.5 vs 2.2, p=0.013) skills. There was no significant difference between CTs in the new curriculum in the Script Concordance Test (16.5 vs 14.8, p=0.141) and knowledge tests (26.9 vs 24.6, p=0.14) compared to CTs in the traditional curriculum. Our new curriculum teaches communication and technical skills necessary for CPB. The results of this pilot study are encouraging and relevant. They give grounds for future research with a larger panel of trainees. Based on the current distribution of scores, a sample size of 12 CTs per group should yield significant results for all tests. © The Author(s) 2014.
Career Technical Education Pathways Initiative
ERIC Educational Resources Information Center
California Community Colleges, Chancellor's Office, 2013
2013-01-01
California's education system--the largest in the United States--is an essential resource for ensuring strong economic growth in the state. The Career Technical Education Pathways Initiative (referred to as the Initiative in this report), which became law in 2005, brings together community colleges, K-12 school districts, employers, organized…
Verma, Mahendra K.; Warwick, Peter D.
2011-01-01
The Energy Independence and Security Act of 2007 (Public Law 110-140) authorized the U.S. Geological Survey (USGS) to conduct a national assessment of geologic storage resources for carbon dioxide (CO2) and requested that the USGS estimate the "potential volumes of oil and gas recoverable by injection and sequestration of industrial carbon dioxide in potential sequestration formations" (121 Stat. 1711). The USGS developed a noneconomic, probability-based methodology to assess the Nation's technically assessable geologic storage resources available for sequestration of CO2 (Brennan and others, 2010) and is currently using the methodology to assess the Nation's CO2 geologic storage resources. Because the USGS has not developed a methodology to assess the potential volumes of technically recoverable hydrocarbons that could be produced by injection and sequestration of CO2, the Geologic Carbon Sequestration project initiated an effort in 2010 to develop a methodology for the assessment of the technically recoverable hydrocarbon potential in the sedimentary basins of the United States using enhanced oil recovery (EOR) techniques with CO2 (CO2-EOR). In collaboration with Stanford University, the USGS hosted a 2-day CO2-EOR workshop in May 2011, attended by 28 experts from academia, natural resource agencies and laboratories of the Federal Government, State and international geologic surveys, and representatives from the oil and gas industry. The geologic and the reservoir engineering and operations working groups formed during the workshop discussed various aspects of geology, reservoir engineering, and operations to make recommendations for the methodology.
NASA Technical Reports Server (NTRS)
McGhee, David S.
2005-01-01
Today's NASA is facing significant challenges and changes. The Exploration initiative indicates a large increase in projects with limited increase in budget. The Columbia report has criticized NASA for its lack of insight and technical integration impacting its ability to provide safety. The Aldridge report is advocating NASA find new ways of doing business. Very early in the Space Launch Initiative (SLI) program a small team of engineers at MSFC were asked to propose a process for performing a system level assessment of a launch vehicle. The request was aimed primarily at providing insight and making NASA a "smart buyer." Out of this effort the VIPA team was created. The difference between the VIPA effort and many integration attempts is that VIPA focuses on using experienced people from various disciplines and a process which focuses them on a technically integrated assessment. Most previous attempts have focused on developing an all encompassing software tool. In addition, VIPA anchored its process formulation in the experience of its members and in early developmental Space Shuttle experience. The primary reference for this is NASA-TP-2001-210092, "Launch Vehicle Design Process: Characterization, Technical Integration, and Lessons Learned," and discussions with its authors. The foundations of VIPA's process are described. The VIPA team also recognized the need to drive detailed analysis earlier in the design process. Analyses and techniques typically done in later design phases, are brought forward using improved computing technology. The intent is to allow the identification of significant sensitivities, trades, and design issues much earlier in the program. This process is driven by the T-model for Technical Integration described in the aforementioned reference. VIPA's approach to performing system level technical integration is discussed in detail. Proposed definitions are offered to clarify this discussion and the general systems integration dialog. VIPA's capabilities and process can now be used to significantly enhance the development and monitoring of realizable project requirements. This is done through the use of VIPA's V-model. Starting with a given concept, VIPA's assessment validates the concept's stated performance, identifies significant issues either with the concept or the requirements, and then re-integrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program's insight and review process. The VIPA process has been employed successfully on several projects including SLI, Orbital Space Plane (OSP), and several heavy lift concepts for Exploration. It has also been proposed for use on the Jupiter Icy Moon (JIMO) spacecraft. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful. Selected results from these assessments will be presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-09
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-17
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-06
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
...] Notice of Public Meeting, North Slope Science Initiative-Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-23
...] Notice of Public Meeting, North Slope Science Initiative--Science Technical Advisory Panel AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and the...
Abarca, Christine; Grigg, C Meade; Steele, Jo Ann; Osgood, Laurie; Keating, Heidi
2009-01-01
COMPASS (Comprehensive Assessment, Strategic Success) is the Florida Department of Health's community health assessment and health improvement planning initiative. Since 2002, COMPASS built state and county health department infrastructure to support a comprehensive, systematic, and integrated approach to community health assessment and planning. To assess the capacity of Florida's 67 county health departments (CHDs) to conduct community health assessment and planning and to identify training and technical assistance needs, COMPASS surveyed the CHDs using a Web-based instrument annually from 2004 through 2008. Response rate to the survey was 100 percent annually. In 2007, 96 percent of CHDs reported conducting assessment and planning within the past 3 years; 74 percent used the MAPP (Mobilizing for Action through Planning and Partnerships) framework. Progress was greater for the organizational and assessment phases of the MAPP-based work; only 10 CHDs had identified strategic priorities in 2007, and even fewer had implemented strategies for improving health. In 2007, the most frequently requested types of training were measuring success, developing goals and action plans, and using qualitative data; technical assistance was most frequently requested for program evaluation and writing community health status reports. Florida's CHDs have increased their capacity to conduct community health assessment and planning. Questions remain about sustaining these gains with limited resources.
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
Brownfield to Brightfield Initiative in Oak Ridge, TN - 12346
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hough, Gil; Fairless, Chad
Experience characterizing, permitting, and restoring 'Brownfield' sites-government or industrial sites with restricted future use due to the presence or potential presence of hazardous substances, pollutants, or contaminants-is being leveraged to identify opportunities for redevelopment into solar power generating facilities which, in this context, are called 'Brightfields'. Brownfield sites offer the expansive land necessary for large photovoltaic (PV) solar farms, but require an in-depth working knowledge of complicated regulatory restrictions and environmental constraints to develop them. As a part of the effort to identify opportunities for redevelopment of Brownfield sites for solar applications, a technical guide, was composed specifically for themore » development of solar generation on restricted use sites. The basis of the technical guide gives specific consideration to environmental requirements and installation methods breaking that into three areas for assessing: 1) levels of contamination, 2) ground penetration requirements, and 3) the requirements for aesthetics and maintenance. Brightfield projects are underway to support the technical guide and expand re-industrialization efforts for the former DOE Gaseous Diffusion Plant in Oak Ridge, TN. There are exciting opportunities to turn Brownfields into Brightfield solar energy solutions for meeting the future renewable energy needs of our country. Brownfields that offer the large surface area required for solar PV farms coupled with the technical guide for the installation of solar farms on restricted use sites supports efforts to develop the solar capacities and expertise to tap this future market. The initial projects designed following the technical guide will provide verification of the installation requirements and beneficial reuse of restricted use sites. (authors)« less
Ho, Bella; Ho, Eric
2012-01-01
Introduction: ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Materials and methods: Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods – from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. Results: For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Conclusion: Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that ISO15189 contributed to quality improvement of accredited laboratories. PMID:22838190
Ho, Bella; Ho, Eric
2012-01-01
ISO 15189 was a new standard published in 2003 for accrediting medical laboratories. We believe that some requirements of the ISO 15189 standard are especially difficult to meet for majority of laboratories. The aim of this article was to present the frequency of nonconformities to requirements of the ISO 15189 accreditation standard, encountered during the assessments of medical laboratories in Hong Kong, during 2004 to 2009. Nonconformities reported in assessments based on ISO 15189 were analyzed in two periods - from 2004 to 2006 and in 2009. They are categorized according to the ISO 15189 clause numbers. The performance of 27 laboratories initially assessed between 2004 and 2006 was compared to their performance in the second reassessment in 2009. For management requirements, nonconformities were most frequently reported against quality management system, quality and technical records and document control; whereas for technical requirements, they were reported against examination procedures, equipment, and assuring quality of examination procedures. There was no major difference in types of common nonconformities reported in the two study periods. The total number of nonconformities reported in the second reassessment of 27 laboratories in 2009 was almost halved compared to their initial assessments. The number of significant nonconformities per laboratory significantly decreased (P = 0.023). Similar nonconformities were reported in the two study periods though the frequency encountered decreased. The significant decrease in number of significant nonconformities encountered in the same group of laboratories in the two periods substantiated that 15015189 contributed to quality improvement of accredited laboratories.
Uncertainty Analysis Framework - Hanford Site-Wide Groundwater Flow and Transport Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, Charles R.; Bergeron, Marcel P.; Murray, Christopher J.
2001-11-09
Pacific Northwest National Laboratory (PNNL) embarked on a new initiative to strengthen the technical defensibility of the predictions being made with a site-wide groundwater flow and transport model at the U.S. Department of Energy Hanford Site in southeastern Washington State. In FY 2000, the focus of the initiative was on the characterization of major uncertainties in the current conceptual model that would affect model predictions. The long-term goals of the initiative are the development and implementation of an uncertainty estimation methodology in future assessments and analyses using the site-wide model. This report focuses on the development and implementation of anmore » uncertainty analysis framework.« less
Keller, Robert T
2006-01-01
Transformational leadership, initiating structure, and selected substitutes for leadership were studied as longitudinal predictors of performance in 118 research and development (R&D) project teams from 5 firms. As hypothesized, transformational leadership predicted 1-year-later technical quality, schedule performance, and cost performance and 5-year-later profitability and speed to market. Initiating structure predicted all the performance measures. The substitutes of subordinate ability and an intrinsically satisfying task each predicted technical quality and profitability, and ability predicted speed to market. Moderator effects for type of R&D work were hypothesized and found whereby transformational leadership was a stronger predictor of technical quality in research projects, whereas initiating structure was a stronger predictor of technical quality in development projects. Implications for leadership theory and research are discussed. (c) 2006 APA, all rights reserved.
Brunckhorst, Oliver; Shahid, Shahab; Aydin, Abdullatif; McIlhenny, Craig; Khan, Shahid; Raza, Syed Johar; Sahai, Arun; Brewin, James; Bello, Fernando; Kneebone, Roger; Khan, Muhammad Shamim; Dasgupta, Prokar; Ahmed, Kamran
2015-09-01
Current training modalities within ureteroscopy have been extensively validated and must now be integrated within a comprehensive curriculum. Additionally, non-technical skills often cause surgical error and little research has been conducted to combine this with technical skills teaching. This study therefore aimed to develop and validate a curriculum for semi-rigid ureteroscopy, integrating both technical and non-technical skills teaching within the programme. Delphi methodology was utilised for curriculum development and content validation, with a randomised trial then conducted (n = 32) for curriculum evaluation. The developed curriculum consisted of four modules; initially developing basic technical skills and subsequently integrating non-technical skills teaching. Sixteen participants underwent the simulation-based curriculum and were subsequently assessed, together with the control cohort (n = 16) within a full immersion environment. Both technical (Time to completion, OSATS and a task specific checklist) and non-technical (NOTSS) outcome measures were recorded with parametric and non-parametric analyses used depending on the distribution of our data as evaluated by a Shapiro-Wilk test. Improvements within the intervention cohort demonstrated educational value across all technical and non-technical parameters recorded, including time to completion (p < 0.01), OSATS scores (p < 0.001), task specific checklist scores (p = 0.011) and NOTSS scores (p < 0.001). Content validity, feasibility and acceptability were all demonstrated through curriculum development and post-study questionnaire results. The current developed curriculum demonstrates that integrating both technical and non-technical skills teaching is both educationally valuable and feasible. Additionally, the curriculum offers a validated simulation-based training modality within ureteroscopy and a framework for the development of other simulation-based programmes.
Identifying Effective Strategies to Providing Technical Support to One-to-One Programs
ERIC Educational Resources Information Center
Thomas, Mark W.
2013-01-01
The problem of this study was that while one-to-one initiatives in the K-12 environment are growing, the technical support personnel that work in these environments are experiencing problems supporting these initiatives. The purposes of this study were to: (a) identify common problems of providing technical support in a one-to-one laptop program,…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
...] Notice of Public Meeting, North Slope Science Initiative, Science Technical Advisory Panel, Alaska AGENCY: Bureau of Land Management, Alaska State Office, North Slope Science Initiative, Interior. ACTION: Notice of public meeting. SUMMARY: In accordance with the Federal Land Policy and Management Act (FLPMA) and...
A Portfolio of Community College Initiatives in Rural Economic Development.
ERIC Educational Resources Information Center
Thomas, Margaret G.
Community colleges across the United States have initiated programs that are making an impact on the productivity of rural America and its residents. Profiles of 20 community and technical college initiatives in rural economic development are contained in this report intended for use by community and technical college administrators. The programs…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, J. O.; Mosey, G.
2013-02-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillesheim, M.; Mosey, G.
2014-11-01
The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. Portsmouth Naval Shipyard (PNSY) is a United States Navy facility located on a series of conjoined islands in the Piscataqua River between Kittery, ME and Portsmouth, NH. EPA engaged NREL to conduct a study to determine technical feasibility of deploying ground-source heat pump systems to help PNSY achieve energy reductionmore » goals.« less
Information system of quality assessment for liquid and gaseous medium production
NASA Astrophysics Data System (ADS)
Bobrov, V. N.; Us, N. A.; Davidov, I. S.
2018-05-01
A method and a technical solution for controlling the quality of production of liquid and gaseous media is proposed. It is also proposed to monitor harmful factors in production while ensuring safe working conditions. Initially, using the mathematical model of an ideal atmosphere, the projection to the horizontal surface of the observation trajectory is calculated. At the second stage, the horizontal projection of the observation trajectory in real conditions is measured. The quality of the medium is judged by the difference between the projections of observation trajectories. The technical result is presented in the form of a device allowing obtaining information about the quality of the medium under investigation.
Cooperative global security programs modeling & simulation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Briand, Daniel
2010-05-01
The national laboratories global security programs implement sustainable technical solutions for cooperative nonproliferation, arms control, and physical security systems worldwide. To help in the development and execution of these programs, a wide range of analytical tools are used to model, for example, synthetic tactical environments for assessing infrastructure protection initiatives and tactics, systematic approaches for prioritizing nuclear and biological threat reduction opportunities worldwide, and nuclear fuel cycle enrichment and spent fuel management for nuclear power countries. This presentation will describe how these models are used in analyses to support the Obama Administration's agenda and bilateral/multinational treaties, and ultimately, to reducemore » weapons of mass destruction and terrorism threats through international technical cooperation.« less
Garwood, Elisabeth R; Souza, Richard B; Zhang, Amy; Zhang, Alan L; Ma, C Benjamin; Link, Thomas M; Motamedi, Daria
Evaluate technical feasibility and potential applications of glenohumeral (GH) joint axial traction magnetic resonance imaging (MRI) in healthy volunteers. Eleven shoulders were imaged in neutral and with 4kg axial traction at 3T. Quantitative measurements were assessed. Axial traction was well tolerated. There was statistically significant widening of the superior GH joint space (p=0.002) and acromial angle (p=0.017) with traction. Inter-rater agreement was high. GH joint axial traction MRI is technically feasible and well tolerated in volunteers. Traction of the capsule, widening of the superior GH joint space and acromial angle were observed. Copyright © 2017 Elsevier Inc. All rights reserved.
An assessment of prospects for international cooperation on the Space Exploration Initiative
NASA Technical Reports Server (NTRS)
Cline, Lynn F. H.; Rosendhal, Jeffrey D.
1991-01-01
This paper discusses the unique characteristics of the Space Exploration Initiative (SEI) which will have to be taken into account if the Initiative is to become an international one; the technical capabilities offered by prospective international partners; the political and economic prospects for proceeding with the Initiative both in the United States and elsewhere; and the advantages and disadvantages of various possible approaches to international cooperation on SEI. SEI preparatory activities are likely to extend over a several-year period. Such an extended preparatory period should provide the time needed for coordinating studies, for identifing interests and potential contributions, and for resolving the numerous planning, budgeting, organizational and political issues which will have to be dealt with if such a complex undertaking is to be successfully internationalized.
OECD/NEA study on the economics of the long-term operation of nuclear power plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lokhov, A.; Cameron, R.
2012-07-01
The OECD Nuclear Energy Agency (NEA) established the Ad hoc expert group on the Economics of Long-term Operation (LTO) of Nuclear Power Plants. The primary aim of this group is to collect and analyse technical and economic data on the upgrade and lifetime extension experience in OECD countries, and to assess the likely applications for future extensions. This paper describes the key elements of the methodology of economic assessment of LTO and initial findings for selected NEA member countries. (authors)
Grelier, S; Thetio, M; Quentin, V; Achache, V; Sanchez, N; Leroux, V; Durand, E; Pequignot, R
2011-03-01
The National Hospital of Saint Maurice (HNSM) for Physical Medicine and Rehabilitation aims at strengthening its position as a pivot rehabilitation and physical therapy center. The opening in 2011 of a new unit for the evaluation and treatment of motor disabilities meets this objective. This project includes several parts: clinical, financial, architectural, organizational, applied clinical research as well as dealing with medical equipments and information system. This study focuses on the risk assessment of this future technical unit. This study was conducted by a group of professionals working for the hospital. It started with the design of a functional model to better comprehend the system to be analyzed. Risk assessment consists in confronting this functional model to a list of dangers in order to determine the vulnerable areas of the system. Then the team designed some scenarios to identify the causes, securities barriers and consequences in order to rank the risks. The analysis targeted various dangers, e.g. political, strategic, financial, economical, marketing, clinical and operational. The team identified more than 70 risky scenarios. For 75% of them the criticality level was deemed initially tolerable and under control or unacceptable. The implementation of an action plan for reducing the level of risks before opening this technical unit brought the system down to an acceptable level at 66%. A year prior to opening this technical unit for the evaluation and treatment of motor disabilities, conducting this preliminary risk assessment, with its exhaustive and rigorous methodology, enabled the concerned professionals to work together around an action plan for reducing the risks. 2011 Elsevier Masson SAS. All rights reserved.
Smart roadside initiative gap analysis : trucking technology utilization.
DOT National Transportation Integrated Search
2014-04-01
This technical memorandum synthesizes and summarizes the American Transportation Research Institutes (ATRI) findings for Subtask 2.3 of the Smart Roadside Initiative (SRI) Gap Analysis. As part of this task, ATRI: 1. completed a technical literatu...
Ghazali, Daniel Aiham; Ragot, Stéphanie; Breque, Cyril; Guechi, Youcef; Boureau-Voultoury, Amélie; Petitpas, Franck; Oriot, Denis
2016-03-25
Human error and system failures continue to play a substantial role in adverse outcomes in healthcare. Simulation improves management of patients in critical condition, especially if it is undertaken by a multidisciplinary team. It covers technical skills (technical and therapeutic procedures) and non-technical skills, known as Crisis Resource Management. The relationship between stress and performance is theoretically described by the Yerkes-Dodson law as an inverted U-shaped curve. Performance is very low for a low level of stress and increases with an increased level of stress, up to a point, after which performance decreases and becomes severely impaired. The objectives of this randomized trial are to study the effect of stress on performance and the effect of repeated simulation sessions on performance and stress. This study is a single-center, investigator-initiated randomized controlled trial including 48 participants distributed in 12 multidisciplinary teams. Each team is made up of 4 persons: an emergency physician, a resident, a nurse, and an ambulance driver who usually constitute a French Emergency Medical Service team. Six multidisciplinary teams are planning to undergo 9 simulation sessions over 1 year (experimental group), and 6 multidisciplinary teams are planning to undergo 3 simulation sessions over 1 year (control group). Evidence of the existence of stress will be assessed according to 3 criteria: biological, electrophysiological, and psychological stress. The impact of stress on overall team performance, technical procedure and teamwork will be evaluated. Participant self-assessment of the perceived impact of simulations on clinical practice will be collected. Detection of post-traumatic stress disorder will be performed by self-assessment questionnaire on the 7(th) day and after 1 month. We will concomitantly evaluate technical and non-technical performance, and the impact of stress on both. This is the first randomized trial studying repetition of simulation sessions and its impact on both clinical performance and stress, which is explored by objective and subjective assessments. We expect that stress decreases team performance and that repeated simulation will increase it. We expect no variation of stress parameters regardless of the level of performance. ClinicalTrials.gov registration number NCT02424890.
ERIC Educational Resources Information Center
Hammond, Cathy; Drew, Sam F.; Withington, Cairen; Griffith, Cathy; Swiger, Caroline M.; Mobley, Catherine; Sharp, Julia L.; Stringfield, Samuel C.; Stipanovic, Natalie; Daugherty, Lindsay
2013-01-01
This Technical Appendix discusses how researchers from the National Research Center for Career and Technical Education (NRCCTE) conducted the five-year longitudinal study of South Carolina's Personal Pathway to Success initiative, which was authorized by the state's Education and Economic Development Act (EEDA) in 2005, and how they defined and…
Iosif, Christina; Di Maria, Federico; Sourour, Nader; Degos, Vincent; Bonneville, Fabrice; Biondi, Alessandra; Jean, Betty; Colonne, Chantal; Nouet, Aurelien; Chiras, Jacques; Clarençon, Frédéric
2014-05-01
Coiling of ruptured intracranial aneurysms in elderly patients remains debatable in terms of technical feasibility and clinical outcome. In this observational cohort study we aimed to assess the technical feasibility, complication profile and clinical outcomes of elderly patients with subarachnoid hemorrhage (SAH) treated with endovascular therapy. The study included 59 consecutive patients (47 women) aged ≥70 years (mean age 76 years, range 71-84) admitted to our institution with SAH from January 2002 to July 2011. The patients were treated for 66 aneurysms (regular coiling: n=62 (94%), balloon-assisted technique: n=2 (3%), stent and coil technique: n=2 (3%)). World Federation of Neurosurgery (WFNS) grade at admission was 1 in 13 patients, 2 in 23 patients, 3 in 8 patients, 4 in 11 patients and 5 in 4 patients. We analysed data by univariate and multivariate statistical analyses with an emphasis on the initial clinical situation, complications and clinical outcome. The technical success rate was 98% with a procedure-related deficit rate of 10% and procedure-related death rate of 5%. The Glasgow Outcome Scale score at 6 months was 1 in 15 patients (25.4%), 2 in 8 patients (13.6%), 3 in 14 patients (23.7%), 4 in 11 patients (18.6%) and 5 in 11 patients (18.6%). Patients admitted with a high initial WFNS grade did not differ statistically in terms of clinical outcome. The final clinical outcome was not significantly correlated with age, initial Fisher score or procedure-related complications. Endovascular treatment of elderly patients with ruptured cerebral aneurysms is feasible, safe and beneficial regardless of the presenting WFNS score.
Barriers to Electronic Health Record Adoption: a Systematic Literature Review.
Kruse, Clemens Scott; Kristof, Caitlin; Jones, Beau; Mitchell, Erica; Martinez, Angelica
2016-12-01
Federal efforts and local initiatives to increase adoption and use of electronic health records (EHRs) continue, particularly since the enactment of the Health Information Technology for Economic and Clinical Health (HITECH) Act. Roughly one in four hospitals not adopted even a basic EHR system. A review of the barriers may help in understanding the factors deterring certain healthcare organizations from implementation. We wanted to assemble an updated and comprehensive list of adoption barriers of EHR systems in the United States. Authors searched CINAHL, MEDLINE, and Google Scholar, and accepted only articles relevant to our primary objective. Reviewers independently assessed the works highlighted by our search and selected several for review. Through multiple consensus meetings, authors tapered articles to a final selection most germane to the topic (n = 27). Each article was thoroughly examined by multiple authors in order to achieve greater validity. Authors identified 39 barriers to EHR adoption within the literature selected for the review. These barriers appeared 125 times in the literature; the most frequently mentioned barriers were regarding cost, technical concerns, technical support, and resistance to change. Despite federal and local incentives, the initial cost of adopting an EHR is a common existing barrier. The other most commonly mentioned barriers include technical support, technical concerns, and maintenance/ongoing costs. Policy makers should consider incentives that continue to reduce implementation cost, possibly aimed more directly at organizations that are known to have lower adoption rates, such as small hospitals in rural areas.
Iguchi, Toshihiro; Hiraki, Takao; Matsui, Yusuke; Fujiwara, Hiroyasu; Masaoka, Yoshihisa; Tanaka, Takashi; Sato, Takuya; Gobara, Hideo; Toyooka, Shinichi; Kanazawa, Susumu
2018-05-01
To retrospectively evaluate the technical success of computed tomography fluoroscopy-guided short hookwire placement before video-assisted thoracoscopic surgery and to identify the risk factors for initial placement failure. In total, 401 short hookwire placements for 401 lesions (mean diameter 9.3 mm) were reviewed. Technical success was defined as correct positioning of the hookwire. Possible risk factors for initial placement failure (i.e., requirement for placement of an additional hookwire or to abort the attempt) were evaluated using logistic regression analysis for all procedures, and for procedures performed via the conventional route separately. Of the 401 initial placements, 383 were successful and 18 failed. Short hookwires were finally placed for 399 of 401 lesions (99.5%). Univariate logistic regression analyses revealed that in all 401 procedures only the transfissural approach was a significant independent predictor of initial placement failure (odds ratio, OR, 15.326; 95% confidence interval, CI, 5.429-43.267; p < 0.001) and for the 374 procedures performed via the conventional route only lesion size was a significant independent predictor of failure (OR 0.793, 95% CI 0.631-0.996; p = 0.046). The technical success of preoperative short hookwire placement was extremely high. The transfissural approach was a predictor initial placement failure for all procedures and small lesion size was a predictor of initial placement failure for procedures performed via the conventional route. • Technical success of preoperative short hookwire placement was extremely high. • The transfissural approach was a significant independent predictor of initial placement failure for all procedures. • Small lesion size was a significant independent predictor of initial placement failure for procedures performed via the conventional route.
Development of Autonomous Aerobraking (Phase 1)
NASA Technical Reports Server (NTRS)
Murri, Daniel G.; Powell, Richard W.; Prince, Jill L.
2012-01-01
The NASA Engineering and Safety Center received a request from Mr. Daniel Murri (NASA Technical Fellow for Flight Mechanics) to develop an autonomous aerobraking capability. An initial evaluation for all phases of this assessment was approved to proceed at the NESC Review Board meeting. The purpose of phase 1 of this study was to provide an assessment of the feasibility of autonomous aerobraking. During this phase, atmospheric, aerodynamic, and thermal models for a representative spacecraft were developed for both the onboard algorithm known as Autonomous Aerobraking Development Software, and a ground-based "truth" simulation developed for testing purposes. The results of the phase 1 assessment are included in this report.
Larkin, Paul; O'Connor, Donna
2017-01-01
Using the modified Delphi method, we aimed to understand the attributes youth coaches and recruiters perceive as important when identifying skilled youth performance at the entry level of representative soccer in Australia (i.e., Under 13 years). Furthermore, we also aimed to describe the current methods youth coaches and recruiters use to assess and identify these attributes in youth players. Australian regional youth technical directors and coaches (n = 20) completed a three stage process, including an initial interview and two subsequent questionnaires, whereby attributes and qualities associated with talent identification were rated and justified according to the importance for youth player performance and talent identification. Results indicate a hierarchy of attributes recruiters perceive as important for Under 13 soccer performance, including technical (i.e., first touch, striking the ball, one-versus-one ability, and technical ability under pressure), tactical (i.e., decision-making ability) and psychological attributes (i.e., coachability and positive attitude). In addition, the findings indicated attributes and qualities not emphasised within the talent identification process including, physiological, anthropometrical, sociological and several psychological attributes. It is suggested talent recruiters apply a holistic multidisciplinary approach to talent identification, with the current findings potentially providing initial evidence to suggest recruiters do consider numerous attributes when selecting and identifying youth players.
2017-01-01
Using the modified Delphi method, we aimed to understand the attributes youth coaches and recruiters perceive as important when identifying skilled youth performance at the entry level of representative soccer in Australia (i.e., Under 13 years). Furthermore, we also aimed to describe the current methods youth coaches and recruiters use to assess and identify these attributes in youth players. Australian regional youth technical directors and coaches (n = 20) completed a three stage process, including an initial interview and two subsequent questionnaires, whereby attributes and qualities associated with talent identification were rated and justified according to the importance for youth player performance and talent identification. Results indicate a hierarchy of attributes recruiters perceive as important for Under 13 soccer performance, including technical (i.e., first touch, striking the ball, one-versus-one ability, and technical ability under pressure), tactical (i.e., decision-making ability) and psychological attributes (i.e., coachability and positive attitude). In addition, the findings indicated attributes and qualities not emphasised within the talent identification process including, physiological, anthropometrical, sociological and several psychological attributes. It is suggested talent recruiters apply a holistic multidisciplinary approach to talent identification, with the current findings potentially providing initial evidence to suggest recruiters do consider numerous attributes when selecting and identifying youth players. PMID:28419175
Consistent Criteria are Needed to Assess Small-Business Innovation Initiatives.
1981-07-07
Federal programs designed to provide funding or technical and management assistance directly to small busi - nesses (such as the National Science...activities to support small businesses as innovators 33 Efforts to influence economy-wide factors 35 Programs that provide funding or management and... Management : A Guide to Entrepreneurship (Boston: Houghton Mifflin, 1977), p. 61. 2/H. Stoll and J. Walter, Tax Incentives for Small Businesses (Chicago
ERIC Educational Resources Information Center
Cook, Royer F.; Morton, Anton S.
In recent years the Army has been concerned about the widespread use of psychoactive drugs by all classes of young people and the effects of this use on the Army. In order to curb this use among soldiers the Army initiated a comprehensive program to prevent and control the abuse of alcohol and drugs. Prevention was considered to include education,…
ERIC Educational Resources Information Center
Hammond, Cathy; Drew, Sam F.; Withington, Cairen; Griffith, Cathy; Swiger, Caroline M.; Mobley, Catherine; Sharp, Julia L.; Stringfield, Samuel C.; Stipanovic, Natalie; Daugherty, Lindsay
2013-01-01
This is the final technical report from the National Research Center for Career and Technical Education's (NRCCTE's) five-year longitudinal study of South Carolina's Personal Pathway to Success initiative, which was authorized by the state's Education and Economic Development Act (EEDA) in 2005. NRCCTE-affiliated researchers at the National…
Reuther, Rudolf
2011-02-01
In 2010, the EU FP NanoSustain project (247989) has been successfully launched with the objective to develop innovative solutions for the sustainable use, recycling and final treatment of engineered nanomaterials (ENMs). The same year, NanoValid (263147), a large-scale integrating EU FP7 project has been initiated and contract negotiations with the European Commission commenced, to develop new reference methods and materials applicable to the unique properties of ENMs. The paper presented will give an overview on the main objectives of these 2 new European research initiatives, on main tasks to achieve objectives, and on the impact on current standardization efforts and technical innovations.
DOT National Transportation Integrated Search
2012-08-01
This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...
Kang, T W; Lee, M W; Hye, M J; Song, K D; Lim, S; Rhim, H; Lim, H K; Cha, D I
2014-12-01
To evaluate the technical feasibility of artificial ascites formation using an angiosheath before percutaneous radiofrequency ablation (RFA) for hepatic tumours and to determine predictive factors affecting the technical failure of artificial ascites formation. This retrospective study was approved by the institutional review board. One hundred and thirteen patients underwent percutaneous RFA of hepatic tumours after trying to make artificial ascites using an angiosheath to avoid collateral thermal damage. The technical success rate of making artificial ascites using an angiosheath and conversion rate to other techniques after initial failure of making artificial ascites were evaluated. The technical success rate for RFA was assessed. In addition, potential factors associated with technical failure including previous history of transcatheter arterial chemoembolization (TACE) or RFA, type of abdominal surgery, and adjacent perihepatic structures were reviewed. Predictive factors for the technical failure of artificial ascites formation were analysed using multivariate analysis. The technical success rates of artificial ascites formation by angiosheath and that of RFA were 84.1% (95/113) and 97.3% (110/113), respectively. The conversion rate to other techniques after the failure of artificial ascites formation using an angiosheath was 15.9% (18/113). Previous hepatic resection was the sole independent predictive factor affecting the technical failure of artificial ascites formation (p<0.001, odds ratio = 29.03, 95% confidence interval: 4.56-184.69). Making artificial ascites for RFA of hepatic tumours using an angiosheath was technically feasible in most cases. However, history of hepatic resection was a significant predictive factor affecting the technical failure of artificial ascites formation. Copyright © 2014 The Royal College of Radiologists. Published by Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Hammond, Cathy; Drew, Sam F.; Withington, Cairen; Griffith, Cathy; Swiger, Caroline M.; Mobley, Catherine; Sharp, Julia L.; Stringfield, Samuel C.; Stipanovic, Natalie; Daugherty, Lindsay
2013-01-01
This Technical Appendix is part of the report from the National Research Center for Career and Technical Education's (NRCCTE's) five-year longitudinal study of South Carolina's Personal Pathway to Success initiative, which was authorized by the state's Education and Economic Development Act (EEDA) in 2005. NRCCTE-affiliated researchers at the…
Geologic coal assessment: The interface with economics
Attanasi, E.D.
2001-01-01
Geologic resource assessments describe the location, general characteristics, and estimated volumes of resources, whether in situ or technically recoverable. Such compilations are only an initial step in economic resource evaluation. This paper identifies, by examples from the Illinois and Appalachian basins, the salient features of a geologic assessment that assure its usefulness to downstream economic analysis. Assessments should be in sufficient detail to allocate resources to production units (mines or wells). Coal assessments should include the spatial distribution of coal bed characteristics and the ability to allocate parts of the resource to specific mining technologies. For coal bed gas assessment, the production well recoveries and well deliverability characteristics must be preserved and the risk structure should be specified so dryholes and noncommercial well costs are recovered by commercially successful wells. ?? 2001 International Association for Mathematical Geology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ogden, J.M.; Steinbugler, M.; Dennis, E.
For several years, researchers at Princeton University`s Center for Energy and Environmental Studies have carried out technical and economic assessments of hydrogen energy systems. Initially, we focussed on the long term potential of renewable hydrogen. More recently we have explored how a transition to renewable hydrogen might begin. The goal of our current work is to identify promising strategies leading from near term hydrogen markets and technologies toward eventual large scale use of renewable hydrogen as an energy carrier. Our approach has been to assess the entire hydrogen energy system from production through end-use considering technical performance, economics, infrastructure andmore » environmental issues. This work is part of the systems analysis activity of the DOE Hydrogen Program. In this paper we first summarize the results of three tasks which were completed during the past year under NREL Contract No. XR-11265-2: in Task 1, we carried out assessments of near term options for supplying hydrogen transportation fuel from natural gas; in Task 2, we assessed the feasibility of using the existing natural gas system with hydrogen and hydrogen blends; and in Task 3, we carried out a study of PEM fuel cells for residential cogeneration applications, a market which might have less stringent cost requirements than transportation. We then give preliminary results for two other tasks which are ongoing under DOE Contract No. DE-FG04-94AL85803: In Task 1 we are assessing the technical options for low cost small scale production of hydrogen from natural gas, considering (a) steam reforming, (b) partial oxidation and (c) autothermal reforming, and in Task 2 we are assessing potential markets for hydrogen in Southern California.« less
Cohen, Daniel; Sevdalis, Nick; Patel, Vishal; Taylor, Michael; Lee, Henry; Vokes, Mick; Heys, Mick; Taylor, David; Batrick, Nicola; Darzi, Ara
2013-07-01
To determine feasibility and reliability of skills assessment in a multi-agency, triple-site major incident response exercise carried out in a virtual world environment. Skills assessment was carried out across three scenarios. The pre-hospital scenario required paramedics to triage and treat casualties at the site of an explosion. Technical skills assessment forms were developed using training syllabus competencies and national guidelines identified by pre-hospital response experts. Non-technical skills were assessed using a seven-point scale previously developed for use by pre-hospital paramedics. The two in-hospital scenarios, focusing on a trauma team leader and a silver/clinical major incident co-ordinator, utilised the validated Trauma-NOTECHS scale to assess five domains of performance. Technical competencies were assessed using an ATLS-style competency scale for the trauma scenario. For the silver scenario, the assessment document was developed using competencies described from a similar role description in a real-life hospital major incident plan. The technical and non-technical performance of all participants was assessed live by two experts in each of the three scenarios and inter-assessor reliability was computed. Participants also self-assessed their performance using identical proformas immediately after the scenarios were completed. Self and expert assessments were correlated (assessment cross-validation). Twenty-three participants underwent all scenarios and assessments. Performance assessments were feasible for both experts as well as the participants. Non-technical performance was generally scored higher than technical performance. Very good inter-rater reliability was obtained between expert raters across all scenarios and both technical and non-technical aspects of performance (reliability range 0.59-0.90, Ps<0.01). Significant positive correlations were found between self and expert assessment in technical skills across all three scenarios (correlation range 0.52-0.84, Ps<0.05), although no such correlations were observed in non-technical skills. This study establishes feasibility and reliability of virtual environment technical and non-technical skills assessment in major incident scenarios for the first time. The development for further scenarios and validated assessment scales will enable major incident planners to utilise virtual technologies for improved major incident preparation and training. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.
Ory, Marcia G; Altpeter, Mary; Belza, Basia; Helduser, Janet; Zhang, Chen; Smith, Matthew Lee
2014-01-01
Dissemination and implementation (D&I) frameworks are increasingly being promoted in public health research. However, less is known about their uptake in the field, especially for diverse sets of programs. Limited questionnaires exist to assess the ways that frameworks can be utilized in program planning and evaluation. We present a case study from the United States that describes the implementation of the RE-AIM framework by state aging services providers and public health partners and a questionnaire that can be used to assess the utility of such frameworks in practice. An online questionnaire was developed to capture community perspectives about the utility of the RE-AIM framework. Distributed to project leads in 27 funded states in an evidence-based disease prevention initiative for older adults, 40 key stakeholders responded representing a 100% state-participation rate among the 27 funded states. Findings suggest that there is perceived utility in using the RE-AIM framework when evaluating grand-scale initiatives for older adults. The RE-AIM framework was seen as useful for planning, implementation, and evaluation with relevance for evaluators, providers, community leaders, and policy makers. Yet, the uptake was not universal, and some respondents reported difficulties in use, especially adopting the framework as a whole. This questionnaire can serve as the basis to assess ways the RE-AIM framework can be utilized by practitioners in state-wide D&I efforts. Maximal benefit can be derived from examining the assessment of RE-AIM-related knowledge and confidence as part of a continual quality assurance process. We recommend such an assessment be performed before the implementation of new funding initiatives and throughout their course to assess RE-AIM uptake and to identify areas for technical assistance.
49 CFR 845.22 - Technical panel.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Technical panel. 845.22 Section 845.22... Technical panel. The Director, Bureau of Accident Investigation, or the Director, Bureau of Field Operations, shall designate members of the Board's technical staff to participate in the hearing and initially...
Data quality objectives for the initial fuel conditioning examinations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, L.A.
The Data Quality Objectives (DQOs) were established for the response of the first group of fuel samples shipped from the K West Basin to the Hanford 327 Building hot cells for examinations to the proposed Path Forward conditioning process. Controlled temperature and atmosphere furnace testing testing will establish performance parameters using the conditioning process (drying, sludge drying, hydride decomposition passivation) proposed by the Independent Technical Assessment (ITA) Team as the baseline.
1986-12-01
Classification. U Security Marks, Accession *:U00298 AD *. ADA096538 TITLE: Assessment of the Crossed Porro Prism Resonator AUTHOR. Seea, B.A.; Fueloep, K...Laser Range Finder Mechanical Property Stability Resonator Porro Prism Standord Mirror Examine Pgs: 16 Classification: U Security Marks: Accession...Gamma-Ray Laser Graser Mossbauer Effect Borrman Superradiance Nuclear-Magnetic Resonance Pgs: 26 Classification: U Security Marks: Accession *:U00484 AD
Technical Report 1205: A Simple Probabilistic Combat Model
2016-07-08
This page intentionally left blank. 1. INTRODUCTION The Lanchester combat model1 is a simple way to assess the effects of quantity and quality...model. For the random case, assume R red weapons are allocated to B blue weapons randomly. We are interested in the distribution of weapons assigned...the initial condition is very close to the break even line. What is more interesting is that the probability density tends to concentrate at either a
2003-08-28
Zielinski , EDAW, Inc., concerning utilities supply and demand for Vandenberg Air Force Base, 1 August. Rush, P., 2002. Personal communication between...Pernell W. Rush, Technical Sergeant, Water Utilities/Water Treatment NCO, USAF 30th CES/CEOIU, Vandenberg Air Force Base, and James E. Zielinski ... Dave Savinsky, Environmental Consultant, 30 CES/CEVC, Vandenberg Air Force Base, on the Preliminary Draft Ground-Based Midcourse Defense (GMD
Non-technical skills of surgical trainees and experienced surgeons.
Gostlow, H; Marlow, N; Thomas, M J W; Hewett, P J; Kiermeier, A; Babidge, W; Altree, M; Pena, G; Maddern, G
2017-05-01
In addition to technical expertise, surgical competence requires effective non-technical skills to ensure patient safety and maintenance of standards. Recently the Royal Australasian College of Surgeons implemented a new Surgical Education and Training (SET) curriculum that incorporated non-technical skills considered essential for a competent surgeon. This study sought to compare the non-technical skills of experienced surgeons who completed their training before the introduction of SET with the non-technical skills of more recent trainees. Surgical trainees and experienced surgeons undertook a simulated scenario designed to challenge their non-technical skills. Scenarios were video recorded and participants were assessed using the Non-Technical Skills for Surgeons (NOTSS) scoring system. Participants were divided into subgroups according to years of experience and their NOTSS scores were compared. For most NOTSS elements, mean scores increased initially, peaking around the time of Fellowship, before decreasing roughly linearly over time. There was a significant downward trend in score with increasing years since being awarded Fellowship for six of the 12 NOTSS elements: considering options (score -0·015 units per year), implementing and reviewing decisions (-0·020 per year), establishing a shared understanding (-0·014 per year), setting and maintaining standards (-0·024 per year), supporting others (-0·031 per year) and coping with pressure (-0·015 per year). The drop in NOTSS score was unexpected and highlights that even experienced surgeons are not immune to deficiencies in non-technical skills. Consideration should be given to continuing professional development programmes focusing on non-technical skills, regardless of the level of professional experience. © 2017 BJS Society Ltd Published by John Wiley & Sons Ltd.
ERIC Educational Resources Information Center
Ding, Daniel D.
2018-01-01
Very few articles exist that document technical communication in Hungary. My Fulbright research reveals two general points: First, technical communication pedagogy stresses correct use of professional terms and phrases in technical translations or technical articles for fictional audiences. Second, it does not emphasize the importance of…
EPA is establishing or revising initial area designations and a technical amendment to correct an inadvertent error in the initial designation for one area for the 2012 annual national ambient air quality standards for fine particle pollution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weiner, Ruth F.; Blink, James A.; Rechard, Robert Paul
This report examines the current policy, legal, and regulatory framework pertaining to used nuclear fuel and high level waste management in the United States. The goal is to identify potential changes that if made could add flexibility and possibly improve the chances of successfully implementing technical aspects of a nuclear waste policy. Experience suggests that the regulatory framework should be established prior to initiating future repository development. Concerning specifics of the regulatory framework, reasonable expectation as the standard of proof was successfully implemented and could be retained in the future; yet, the current classification system for radioactive waste, including hazardousmore » constituents, warrants reexamination. Whether or not consideration of multiple sites are considered simultaneously in the future, inclusion of mechanisms such as deliberate use of performance assessment to manage site characterization would be wise. Because of experience gained here and abroad, diversity of geologic media is not particularly necessary as a criterion in site selection guidelines for multiple sites. Stepwise development of the repository program that includes flexibility also warrants serious consideration. Furthermore, integration of the waste management system from storage, transportation, and disposition, should be examined and would be facilitated by integration of the legal and regulatory framework. Finally, in order to enhance acceptability of future repository development, the national policy should be cognizant of those policy and technical attributes that enhance initial acceptance, and those policy and technical attributes that maintain and broaden credibility.« less
Palter, Vanessa N; Beyfuss, Kaitlyn A; Jokhio, Adam R; Ryzynski, Agnes; Ashamalla, Shady
2016-11-01
Preliminary evidence suggests that coaching is an effective adjunct in resident training. The learning needs of faculty, however, are different from those of trainees. Assessing the effectiveness of peer coaching at improving the technical proficiency of practicing surgeons is an area that remains largely unexplored. The purpose of this study was to assess the efficacy of a peer coaching program that teaches laparoscopic suturing to faculty surgeons. Surgeons inexperienced in laparoscopic suturing were randomized to either conventional training or peer coaching. Both groups performed a pretest on a box trainer. The conventional training group then received a web link to a tutorial for teaching laparoscopic suturing and a box trainer for independent practice. In addition to the web link and the box trainer, the peer coaching group received 2 half hour peer coaching sessions. Both groups then performed a stitch on the box trainer that was video recorded. The primary outcome measure was technical performance, which was assessed by a global rating scale. Eighteen faculty were randomized (conventional training n = 9; peer coaching n = 9). Initially, there was no difference in technical skills between the groups (conventional training median score 10 [interquartile range 8.5-15]; peer coaching 13 [10.5-14]; P = .64). After the intervention, the peer coaching group had improved technical performance (conventional training 11 [8.5-12.5]; peer coaching 18 [17-19]; P < .01). Comparing the pre- and postintervention scores within both groups, there was an improvement in technical proficiency in the peer coaching group, yet none in the conventional training group (before conventional training 10 [8.5-15], after conventional training 11 [8.5-12.5]; P = .56; before peer coaching 13 [10.5-14], after peer coaching 18 [17-19]; P < .01). This trial demonstrates that a structured peer coaching program can facilitate faculty surgeons learning a novel procedure. Copyright © 2016 Elsevier Inc. All rights reserved.
78 FR 27235 - Technical Guidance for Assessing Environmental Justice in Regulatory Analysis
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... Justice in Regulatory Analysis.'' The purpose of this guidance is to provide EPA analysts with technical...-566-2363. Mail: Technical Guidance for Assessing Environmental Justice in Regulatory Analysis... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OA-2013-0320; FRL-9810-5] Technical Guidance for Assessing...
Initiatives in Technical and Further Education. Numbers 3 and 4.
ERIC Educational Resources Information Center
National TAFE Clearinghouse, Adelaide (Australia).
These two issues contain abstracts of 127 and 118 documents, respectively, related to the field of technical and further education that are available through the Australian Technical and Further Education (TAFE) Clearinghouse system. These types of materials are included: research reports/technical reports, evaluation studies, curriculum materials…
Activation of the NLRP3 inflammasome by proteins that signal for necroptosis.
Kang, Tae-Bong; Yang, Seung-Hoon; Toth, Beata; Kovalenko, Andrew; Wallach, David
2014-01-01
Necroptosis-a form of programmed necrotic cell death-and its resulting release of damage-associated molecular patterns (DAMPs) are believed to participate in the triggering of inflammatory processes. To assess the relative contribution of this cell death mode to inflammation, we need to know what other cellular effects can be exerted by molecules shown to trigger necrotic death, and the extent to which those effects might themselves contribute to inflammation. Here, we describe the technical approaches that have been applied to assess the impact of the main signaling molecules known to mediate activation of necroptosis upon generation of inflammatory cytokines in LPS-treated mouse bone marrow-derived dendritic cells. The findings obtained by this assessment indicated that signaling molecules known to initiate necroptosis can also initiate activation of the NLRP3 inflammasome, thereby inducing inflammation independently of cell death by triggering the generation of proinflammatory cytokines such as IL-1β. © 2014 Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Latham, Brent
The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less
Report of the Defense Science Board Task Force on National Aero-Space Plane (NASP) Program
NASA Technical Reports Server (NTRS)
1992-01-01
Six years ago, the Defense Science Board (DSB) initiated a review of the concept, technical basis, program content, and missions of the National Aerospace Plane (NASP) program. The report was completed in Sep. 1988, and the recommendations contributed to strengthening the technical efforts in the NASP program. Since then, substantial technological progress has been made in the technology development phase (Phase 2) of the program. Phase 2 of the program is currently scheduled to end in late Fiscal Year 1993, with a decision whether to proceed to the experimental flight vehicle phase (Phase 3) to be made at that time. This decision will be a very significant one for the Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA). In February of this year, the DSB was chartered to revisit the NASP program to assess the degree to which the many technical challenges of the program have been resolved, or are likely to be resolved by the end of Phase 2.
ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project
NASA Technical Reports Server (NTRS)
Baresi, Larry
1989-01-01
The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Korsah, Kofi; Muhlheim, Michael David; Wood, Richard
The US Nuclear Regulatory Commission (NRC) is initiating a new rulemaking project to develop a digital system common-cause failure (CCF) rule. This rulemaking will review and modify or affirm the NRC's current digital system CCF policy as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, Instrumentation and Controls, in NRCmore » Regulatory Guide (NUREG)-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants (ML033580677). The Oak Ridge National Laboratory (ORNL) is providing technical support to the NRC staff on the CCF rulemaking, and this report is one of several providing the technical basis to inform NRC staff members. For the task described in this report, ORNL examined instrumentation and controls (I&C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF is adequate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed.« less
ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project
NASA Astrophysics Data System (ADS)
Baresi, Larry
1989-03-01
The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.
Donner, Daniel G; Kiriazis, Helen; Du, Xiao-Jun; Marwick, Thomas H; McMullen, Julie R
2018-04-20
Informal training in preclinical research may be a contributor to the poor reproducibility of preclinical cardiology research and low rates of translation into clinical research and practice. Mouse echocardiography is a widely used technique to assess cardiac structure and function in drug intervention studies using disease models. The inter-observer variability (IOV) of clinical echocardiographic measurements has been shown to improve with formalized training, but preclinical echocardiography lacks similarly critical standardization of training. The aims of this investigation were to assess the IOV of echocardiographic measurements from studies in mice, and address any technical impediments to reproducibility by implementing standardized guidelines through formalized training. In this prospective, single-site, observational cohort study, 13 scientists performing preclinical echocardiographic image analysis were assessed for measurement of short-axis M-mode-derived dimensions and calculated left ventricular mass (LVMass). Ten M-mode images of mouse hearts acquired and analyzed by an expert researcher with a spectrum of LVMass were selected for assessment, and validated by autopsy weight. Following the initial observation, a structured formal training program was introduced, and accuracy and reproducibility were re-evaluated. Mean absolute percentage error (MAPE) for Expert-calculated LVMass was 6{plus minus}4% compared to autopsy LVMass, and 25{plus minus}21% for participants before training. Standardized formal training improved participant MAPE by approximately 30% relative to expert-calculated LVMass (p<0.001). Participants initially categorized with high-range error (25-45%) improved to low-moderate error ranges (<15-25%). This report reveals an example of technical skill training insufficiency likely endemic to preclinical research and provides validated guidelines for echocardiographic measurement for adaptation to formalized in-training programs.
An improved global wind resource estimate for integrated assessment models
Eurek, Kelly; Sullivan, Patrick; Gleason, Michael; ...
2017-11-25
This study summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquelymore » detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km 2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.« less
An improved global wind resource estimate for integrated assessment models
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eurek, Kelly; Sullivan, Patrick; Gleason, Michael
This study summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquelymore » detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km 2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.« less
2007-02-01
on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device
2007-02-01
on/off control), trending and trend reports, load shedding/load manage- ment, remote setpoint adjustment, initial diagnosis of a service call and...building-specific operational data such as on/off scheduling com- mands, setpoints , and outside air temperature. With help from several other agencies and...interface for monitoring 3. Provide one interface for device/system management/configuration 4. ( Optimally ) provide one interface for device
NASA Technical Reports Server (NTRS)
Bretmersky, Steven C.; Bishop, William D.; Dailey, Justin E.; Chevalier, Christine T.
2014-01-01
The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) is performing communications systems research for the Unmanned Aircraft System (UAS) in the National Airspace System (NAS) Project. One of the goals of the communications element is to select and test a communications technology for the UAS Control and Non-Payload Communications (CNPC) link. The GRC UAS Modeling and Simulation (M/S) Sub Team will evaluate the performance of several potential technologies for the CNPC link through detailed software simulations. In parallel, an industry partner will implement a technology in hardware to be used for flight testing. The task necessitated a technical assessment of existing Radio Frequency (RF) communications technologies to identify the best candidate systems for use as the UAS CNPC link. The assessment provides a basis for selecting the technologies for the M/S effort and the hardware radio design. The process developed for the technical assessments for the Future Communications Study1 (FCS) was used as an initial starting point for this assessment. The FCS is a joint Federal Aviation Administration (FAA) and Eurocontrol study on technologies for use as a future aeronautical communications link. The FCS technology assessment process methodology can be applied to the UAS CNPC link; however the findings of the FCS are not directly applicable because of different requirements between a CNPC link and a general aeronautical data link. Additional technologies were added to the potential technologies list from the State of the Art Unmanned Aircraft System Communication Assessment developed by NASA GRC2. This document investigates the state of the art of communications as related to UAS. A portion of the document examines potential communications systems for a UAS communication architecture. Like the FCS, the state of the art assessment surveyed existing communications technologies. It did not, however, perform a detailed assessment of the technology necessary to recommend a technology for the UAS CNPC link. The technical assessment process, as shown in Figure 1, consists of the following steps. First, candidate RF communications technologies are identified. An initial review of each of these technologies is then performed to determine if the technology appears to be a good candidate and requires further review. Any technology that can be shown to be inadequate at that point is removed from consideration to allow for more detailed analysis of the remaining technologies. Criteria for the detailed assessments are defined and a scoring methodology is devised. This is followed by the detailed review and scoring of each technology. The least favorable technologies are removed during the process until only the few best candidates remain.
ERIC Educational Resources Information Center
D'Amico, Mark M.; Morgan, Grant B.; Robertson, Thashundray C.
2011-01-01
This study blends elements from two South Carolina Technical College System initiatives--Achieving the Dream and a workforce cluster strategy. Achieving the Dream is a national non-profit organization created to help technical and community college students succeed, particularly low-income students and students of color. This initiative, combined…
NASA Technical Reports Server (NTRS)
Kaye, Karen
1993-01-01
Multimedia initiative objectives for the NASA Scientific and Technical Information (STI) program are described. A multimedia classification scheme was developed and the types of non-print media currently in use are inventoried. The NASA STI Program multimedia initiative is driven by a changing user population and technical requirements in the areas of publications, dissemination, and user and management support.
The "Technical and Vocational Education Initiative": Enclaves in British Schools.
ERIC Educational Resources Information Center
Saunders, Murray
The Technical and Vocational Education Initiative (TVEI) is intended as a pilot, on a massive scale, of particular approaches, with a systematic need to identify TVEI effects on students, staff, resources, and curricula. TVEI has a strong tendency toward the development of pilot enclaves in terms of its administrative, curricular,…
DOT National Transportation Integrated Search
1999-01-01
The World Bank in partnership with United Nations Economic and Social Commission for Asia and the Pacific (ESCAP) sponsored the Regional Technical Workshop on Transport and Transit Facilitation under the Initiative. Participants included public and p...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Healey, V.
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chicago, Milwaukee & St. Paul Rail Yard Company site in Perry, Iowa, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study didmore » not assess environmental conditions at the site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Geet, O.; Mosey, G.
2013-03-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tower Road site in Aurora, Colorado, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions at themore » site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Mosey, G.
2013-05-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Price Landfill site in Pleasantville, New Jersey, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site. This study did not assess environmental conditions atmore » the site.« less
Naughton, Peter A; Aggarwal, Rajesh; Wang, Tim T; Van Herzeele, Isabelle; Keeling, Aoife N; Darzi, Ara W; Cheshire, Nicholas J W
2011-03-01
Adoption of residents' working time restrictions potentially undermines surgical training by reduction of operating room exposure. Simulation has been proposed as a way to acquire necessary skills in a laboratory environment but remains difficult to incorporate into training schedules. This study assessed whether residents working successive nights could acquire endovascular skills similar to colleagues working day shifts. This prospective observational cohort study recruited 20 junior residents, divided into day shift and night shift groups by their respective call schedule. After initial cognitive skills training, a validated renal artery stent module on an endovascular simulator was completed over a series of seven sequential shifts during 1 week. The primary outcome measure was serial technical skill assessments. Secondary measures comprised assessments of activity, cognitive performance, introspective fatigue, quality, and quantity of preceding sleep. Both groups demonstrated significant learning curves for total time at the first session median vs seventh session median (181 vs 564 seconds [P < .001]; night, 1399 vs 572 [P < .001]), fluoroscopy time (day, 702 vs 308 seconds, [P < .001]; night, 669 vs 313 [P < .001]), and contrast volume (day, 29 vs 13 mL [P < .001]; night, 40 vs 16 [P < .001]). Residents working day shifts reached plateau 1 day earlier in the above measures vs those on night duty. The night shift group walked more steps (P < .001), reviewed more patients (P < .001), performed worse on all cognitive assessments (P < .05), slept less (P < .05), had poorer quality of sleep (P = .001), and was more fatigued (P < .001) than the day shift group. Acquired skill was retained a week after completion of shifts. Technical skills training after night shift work enables acquisition of endovascular technical skills, although it takes longer than after day shift training. This study provides evidence for program directors to organize simulation-based training schedules for residents on night shift rotations. Copyright © 2011. Published by Mosby, Inc.
NASA Astrophysics Data System (ADS)
Mitchell, L. W.
2002-12-01
During the initiation of a new program at the University of North Dakota designed to promote American Indians to engage in geoscience research and complete geoscience related degrees, an evaluation procedure utilizing a modified Learning Potential Assessment Device (LPAD) and Mediated Learning Experiences (MLE) to assess minority student progress was implemented. The program, called Indians Into Geosciences (INGEOS), utilized a modified form of the Learning Potential Assessment Device first to assess cultural factors, determination, and other baseline information, and second, utilized a series of Mediated Learning Experiences to enhance minority students' opportunities in a culturally appropriate, culturally diverse, and scientifically challenging manner in an effort to prepare students for competitive research careers in the geosciences. All of the LPADs and MLEs corresponded directly to the three goals or eight objectives of INGEOS. The three goals of the INGEOS program are: 1) increasing the number of American Indians earning degrees at all levels, 2) engaging American Indians in challenging and technically based scientific research, and 3) preparing American Indians for successful geoscience careers through multicultural community involvement. The eight objectives of the INGEOS program, called the Eight Points of Success, are: 1) spiritual health, 2) social health, 3) physical health, 4) mental health, 5) financial management, 6) research involvement, 7) technical exposure, and 8) multicultural community education. The INGEOS program goals were evaluated strictly quantitatively utilizing a variety of data sources such as grade point averages, number of credits earned, research project information, and developed products. The INGEOS Program goals reflected a combined quantitative score of all participants, whereas the objectives reflected qualitative measures and are specific for each INGEOS participant. Initial results indicate that those participants which show progress through Mediated Learning Experiences within all of the Eight Points of Success, have a higher likelihood of contributing to all three of the INGEOS programs goals.
The State of Space Propulsion Research
NASA Technical Reports Server (NTRS)
Sackheim, R. L.; Cole, J. W.; Litchford, R. J.
2006-01-01
The current state of space propulsion research is assessed from both a historical perspective, spanning the decades since Apollo, and a forward-looking perspective, as defined by the enabling technologies required for a meaningful and sustainable human and robotic exploration program over the forthcoming decades. Previous research and technology investment approaches are examined and a course of action suggested for obtaining a more balanced portfolio of basic and applied research. The central recommendation is the establishment of a robust national Space Propulsion Research Initiative that would run parallel with systems development and include basic research activities. The basic framework and technical approach for this proposed initiative are defined and a potential implementation approach is recommended.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scarlata, C.; Mosey, G.
2013-05-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Chanute Air Force Base site in Rantoul, Illinois, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this study was to assess the site for a possible biopower system installation and estimate the cost, performance, and impacts of different biopower options.
Crowdsourcing: a valid alternative to expert evaluation of robotic surgery skills.
Polin, Michael R; Siddiqui, Nazema Y; Comstock, Bryan A; Hesham, Helai; Brown, Casey; Lendvay, Thomas S; Martino, Martin A
2016-11-01
Robotic-assisted gynecologic surgery is common, but requires unique training. A validated assessment tool for evaluating trainees' robotic surgery skills is Robotic-Objective Structured Assessments of Technical Skills. We sought to assess whether crowdsourcing can be used as an alternative to expert surgical evaluators in scoring Robotic-Objective Structured Assessments of Technical Skills. The Robotic Training Network produced the Robotic-Objective Structured Assessments of Technical Skills, which evaluate trainees across 5 dry lab robotic surgical drills. Robotic-Objective Structured Assessments of Technical Skills were previously validated in a study of 105 participants, where dry lab surgical drills were recorded, de-identified, and scored by 3 expert surgeons using the Robotic-Objective Structured Assessments of Technical Skills checklist. Our methods-comparison study uses these previously obtained recordings and expert surgeon scores. Mean scores per participant from each drill were separated into quartiles. Crowdworkers were trained and calibrated on Robotic-Objective Structured Assessments of Technical Skills scoring using a representative recording of a skilled and novice surgeon. Following this, 3 recordings from each scoring quartile for each drill were randomly selected. Crowdworkers evaluated the randomly selected recordings using Robotic-Objective Structured Assessments of Technical Skills. Linear mixed effects models were used to derive mean crowdsourced ratings for each drill. Pearson correlation coefficients were calculated to assess the correlation between crowdsourced and expert surgeons' ratings. In all, 448 crowdworkers reviewed videos from 60 dry lab drills, and completed a total of 2517 Robotic-Objective Structured Assessments of Technical Skills assessments within 16 hours. Crowdsourced Robotic-Objective Structured Assessments of Technical Skills ratings were highly correlated with expert surgeon ratings across each of the 5 dry lab drills (r ranging from 0.75-0.91). Crowdsourced assessments of recorded dry lab surgical drills using a validated assessment tool are a rapid and suitable alternative to expert surgeon evaluation. Copyright © 2016 Elsevier Inc. All rights reserved.
de Montbrun, Sandra L; Roberts, Patricia L; Lowry, Ann C; Ault, Glenn T; Burnstein, Marcus J; Cataldo, Peter A; Dozois, Eric J; Dunn, Gary D; Fleshman, James; Isenberg, Gerald A; Mahmoud, Najjia N; Reznick, Richard K; Satterthwaite, Lisa; Schoetz, David; Trudel, Judith L; Weiss, Eric G; Wexner, Steven D; MacRae, Helen
2013-12-01
To develop and evaluate an objective method of technical skills assessment for graduating subspecialists in colorectal (CR) surgery-the Colorectal Objective Structured Assessment of Technical Skill (COSATS). It may be reasonable for the public to assume that surgeons certified as competent have had their technical skills assessed. However, technical skill, despite being the hallmark of a surgeon, is not directly assessed at the time of certification by surgical boards. A procedure-based, multistation technical skills examination was developed to reflect a sample of the range of skills necessary for CR surgical practice. These consisted of bench, virtual reality, and cadaveric models. Reliability and construct validity were evaluated by comparing 10 graduating CR residents with 10 graduating general surgery (GS) residents from across North America. Expert CR surgeons, blinded to level of training, evaluated performance using a task-specific checklist and a global rating scale. The mean global rating score was used as the overall examination score and a passing score was set at "borderline competent for CR practice." The global rating scale demonstrated acceptable interstation reliability (0.69) for a homogeneous group of examinees. Both the overall checklist and global rating scores effectively discriminated between CR and GS residents (P < 0.01), with 27% of the variance attributed to level of training. Nine CR residents but only 3 GS residents were deemed competent. The Colorectal Objective Structured Assessment of Technical Skill effectively discriminated between CR and GS residents. With further validation, the Colorectal Objective Structured Assessment of Technical Skill could be incorporated into the colorectal board examination where it would be the first attempt of a surgical specialty to formally assess technical skill at the time of certification.
ERIC Educational Resources Information Center
Dougherty, Shaun M.
2016-01-01
This paper uses rich administrative data from Arkansas to understand whether and how high school career and technical education (CTE) programs are related to initial enrollment in college after high school. This descriptive work is designed to inform how other state and local policymakers understand the potential role of high school CTE…
Lake States regional forest resources assessment: technical papers.
Henry H. Webster; J. Michael Vasievich
1997-01-01
Contains 21 technical working papers prepared for the Lake States regional forest resources assessment, Lake States Forestry Alliance 1995. They represent significant contributions from many individuals and organizations and form the technical background for the assessment.
Innovations in energy expenditure assessment.
Achamrah, Najate; Oshima, Taku; Genton, Laurence
2018-06-15
Optimal nutritional therapy has been associated with better clinical outcomes and requires providing energy as closed as possible to measured energy expenditure. We reviewed the current innovations in energy expenditure assessment in humans, focusing on indirect calorimetry and other new alternative methods. Although considered the reference method to measure energy expenditure, the use of indirect calorimetry is currently limited by the lack of an adequate device. However, recent technical developments may allow a broader use of indirect calorimetry for in-patients and out-patients. An ongoing international academic initiative to develop a new indirect calorimeter aimed to provide innovative and affordable technical solutions for many of the current limitations of indirect calorimetry. New alternative methods to indirect calorimetry, including CO2 measurements in mechanically ventilated patients, isotopic approaches and accelerometry-based fitness equipments, show promises but have been either poorly studied and/or are not accurate compared to indirect calorimetry. Therefore, to date, energy expenditure measured by indirect calorimetry remains the gold standard to guide nutritional therapy. Some new innovative methods are demonstrating promises in energy expenditure assessment, but still need to be validated. There is an ongoing need for easy-to-use, accurate and affordable indirect calorimeter for daily use in in-patients and out-patients.
NASA Astrophysics Data System (ADS)
Maskrey, Andrew; Safaie, Sahar
2015-04-01
Disaster risk management strategies, policies and actions need to be based on evidence of current disaster loss and risk patterns, past trends and future projections, and underlying risk factors. Faced with competing demands for resources, at any level it is only possible to priorities a range of disaster risk management strategies and investments with adequate understanding of realised losses, current and future risk levels and impacts on economic growth and social wellbeing as well as cost and impact of the strategy. The mapping and understanding of the global risk landscape has been greatly enhanced by the latest iteration of the GAR Global Risk Assessment and the objective of this submission is to present the GAR global risk assessment which contributed to Global Assessment Report (GAR) 2015. This initiative which has been led by UNISDR, was conducted by a consortium of technical institutions from around the world and has covered earthquake, cyclone, riverine flood, and tsunami probabilistic risk for all countries of the world. In addition, the risks associated with volcanic ash in the Asia-Pacific region, drought in various countries in sub-Saharan Africa and climate change in a number of countries have been calculated. The presentation will share thee results as well as the experience including the challenges faced in technical elements as well as the process and recommendations for the future of such endeavour.
McNabb, Scott J N; Chungong, Stella; Ryan, Mike; Wuhib, Tadesse; Nsubuga, Peter; Alemu, Wondi; Carande-Kulis, Vilma; Rodier, Guenael
2002-01-01
Because both public health surveillance and action are crucial, the authors initiated meetings at regional and national levels to assess and reform surveillance and action systems. These meetings emphasized improved epidemic preparedness, epidemic response, and highlighted standardized assessment and reform. To standardize assessments, the authors designed a conceptual framework for surveillance and action that categorized the framework into eight core and four support activities, measured with indicators. In application, country-level reformers measure both the presence and performance of the six core activities comprising public health surveillance (detection, registration, reporting, confirmation, analyses, and feedback) and acute (epidemic-type) and planned (management-type) responses composing the two core activities of public health action. Four support activities - communications, supervision, training, and resource provision - enable these eight core processes. National, multiple systems can then be concurrently assessed at each level for effectiveness, technical efficiency, and cost. This approach permits a cost analysis, highlights areas amenable to integration, and provides focused intervention. The final public health model becomes a district-focused, action-oriented integration of core and support activities with enhanced effectiveness, technical efficiency, and cost savings. This reform approach leads to sustained capacity development by an empowerment strategy defined as facilitated, process-oriented action steps transforming staff and the system.
2006-05-30
implementation Final Report 4 TECHNICAL PLAN AND RESULTS Task 1: Initiate the Project Management System Two senior NGSS production management...1 Technical Plan and Results...Third the system is hosted on a handheld unit which provides the foremen with an efficient daily planning tool. The Pilot System which entails
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-08
... Executive and Technical Teams; Notification of Availability of Documents. AGENCY: U.S. Army Corps of... public all work products of the Chetco River Gravel Mining Executive and Technical Teams. These work... INFORMATION: The Executive and Technical Teams were established in 2007 as part of an initiative to evaluate...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steen, M.; Lisell, L.; Mosey, G.
2013-01-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vincent Mullins Landfill in Tucson, Arizona, for a feasibility study of renewable energy production. Under the RE-Powering America's Land initiative, the EPA provided funding to the National Renewable Energy Laboratory (NREL) to support the study. NREL provided technical assistance for this project but did not assess environmental conditions at the site beyond those related to the performance of a photovoltaic (PV) system. The purpose of this report is to assess the site for a possible PV installation and estimate the cost and performance ofmore » different PV configurations, as well as to recommend financing options that could assist in the implementation of a PV system. In addition to the Vincent Mullins site, four similar landfills in Tucson are included as part of this study.« less
Status of the assessment phase of the ESA M3 mission candidate LOFT
NASA Astrophysics Data System (ADS)
Corral van Damme, Carlos; Ayre, Mark; Lumb, David; Short, Alexander D.; Rando, Nicola
2012-09-01
LOFT (Large Observatory For x-ray Timing) is one of four candidates for the M3 slot (launch in 2024, with the option of a launch in 2022) of ESAs Cosmic Vision 2015 - 2025 Plan, and as such it is currently undergoing an initial assessment phase lasting one year. The objective of the assessment phase is to provide the information required to enable the down selection process, in particular: the space segment definition for meeting the assigned science objectives; consideration of and initial definition of the implementation schedule; an estimate of the mission Cost at Completion (CaC); an evaluation of the technology readiness evaluation and risk assessment. The assessment phase is divided into two interleaved components: (i) A payload assessment study, performed by teams funded by member states, which is primarily intended for design, definition and programmatic/cost evaluation of the payload, and (ii) A system industrial study, which has essentially the same objectives for the space segment of the mission. This paper provides an overview of the status of the LOFT assessment phase, both for payload and platform. The initial focus is on the payload design status, providing the reader with an understanding of the main features of the design. Then the space segment assessment study status is presented, with an overview of the principal challenges presented by the LOFT payload and mission requirements, and a presentation of the expected solutions. Overall the mission is expected to enable cutting-edge science, is technically feasible, and should remain within the required CaC for an M3 candidate.
A survey of particle contamination in electronic devices
NASA Technical Reports Server (NTRS)
Adolphsen, J. W.; Kagdis, W. A.; Timmins, A. R.
1976-01-01
The experiences are given of a number of National Aeronautics and Space Administration (NASA) and Space and Missile System Organization (SAMSO) contractors with particle contamination, and the methods used for its prevention and detection, evaluates the bases for the different schemes, assesses their effectiveness, and identifies the problems associated with each. It recommends specific short-range tests or approaches appropriate to individual part-type categories and recommends that specific tasks be initiated to refine techniques and to resolve technical and application facets of promising solutions.
Clinical operations management in radiology.
Ondategui-Parra, Silvia; Gill, Ileana E; Bhagwat, Jui G; Intrieri, Lisa A; Gogate, Adheet; Zou, Kelly H; Nathanson, Eric; Seltzer, Steven E; Ros, Pablo R
2004-09-01
Providing radiology services is a complex and technically demanding enterprise in which the application of operations management (OM) tools can play a substantial role in process management and improvement. This paper considers the benefits of an OM process in a radiology setting. Available techniques and concepts of OM are addressed, along with gains and benefits that can be derived from these processes. A reference framework for the radiology processes is described, distinguishing two phases in the initial assessment of a unit: the diagnostic phase and the redesign phase.
1988-12-01
Statistics to Studies of C3 and Spread Spectrum Communications Author(s): Pawula, R. F. * Date: 05/14/86 Pages:004 Report #: AFOSR-TR-87-0210 Corp. Author...1375 AD #: 0 TITLE: SPSS Statistical Algorithms Author(s): 0 Date: 01/01/85 Pages:230 Report #: CN83-60118 Corp. Author: SPSS Inc. 444 N. Michigan Ave...Assessment Mission Architecture Defense Battle Weapon Target Transitor Space Catastrophic Accession #: 1407 AD #: 0 TITLE: What price space-based interceptors
Conceptual design study of 1985 commercial VTOL transports that utilize rotors
NASA Technical Reports Server (NTRS)
Kefford, N. F. K.; Munch, C. L.
1975-01-01
Conceptual design studies of pure and compound helicopter commercial short-haul transport aircraft for initial fabrication in 1980 were performed to determine their technical and economic feasibility. One-hundred-passenger configurations were optimized for minimum direct operating cost consistent with producibility and marketability, with emphasis on proper account of mass properties, performance and handling qualities adequacy, and suppression of internal and external noise. The effect of external noise constraints was assessed, in terms of gross weight and direct operating cost, for each aircraft.
Space Fence PDR Concept Development Phase
NASA Astrophysics Data System (ADS)
Haines, L.; Phu, P.
2011-09-01
The Space Fence, a major Air Force acquisition program, will become the dominant low-earth orbit uncued sensor in the space surveillance network (SSN). Its primary objective is to provide a 24/7 un-cued capability to find, fix, and track small objects in low earth orbit to include emerging and evolving threats, as well as the rapidly growing population of orbital debris. Composed of up to two geographically dispersed large-scale S-band phased array radars, this new system-of-systems concept will provide comprehensive Space Situational Awareness through net-centric operations and integrated decision support. Additionally, this program will facilitate cost saving force structure changes in the SSN, specifically including the decommissioning of very-high frequency VHF Air Force Space Surveillance System (AFSSS). The Space Fence Program Office entered a Preliminary Design Review (PDR) concept development phase in January 2011 to achieve the delivery of the Initial Operational Capability (IOC) expected in FY17. Two contractors were awarded to perform preliminary system design, conduct radar performance analyses and evaluations, and develop a functional PDR radar system prototype. The key objectives for the Phase A PDR effort are to reduce Space Fence total program technical, cost, schedule, and performance risk. The overall program objective is to achieve a preliminary design that demonstrates sufficient technical and manufacturing maturity and that represents a low risk, affordable approach to meet the Space Fence Technical Requirements Document (TRD) requirements for the final development and production phase to begin in 3QFY12. This paper provides an overview of the revised Space Fence program acquisition strategy for the Phase-A PDR phase to IOC, the overall program milestones and major technical efforts. In addition, the key system trade studies and modeling/simulation efforts undertaken during the System Design Requirement (SDR) phase to address and mitigate technical challenges of the Space Fence System will also be discussed. Examples include radar system optimization studies, modeling and simulation for system performance assessment, investigation of innovative Astrodynamics algorithms for initial orbit determination and observation correlation.
Nathan, Meena; Karamichalis, John M; Liu, Hua; del Nido, Pedro; Pigula, Frank; Thiagarajan, Ravi; Bacha, Emile A
2011-11-01
Our objective was to define the relationship between surgical technical performance score, intraoperative adverse events, and major postoperative adverse events in complex pediatric cardiac repairs. Infants younger than 6 months were prospectively followed up until discharge from the hospital. Technical performance scores were graded as optimal, adequate, or inadequate based on discharge echocardiograms and need for reintervention after initial surgery. Case complexity was determined by Risk Adjustment in Congenital Heart Surgery (RACHS-1) category, and preoperative illness severity was assessed by Pediatric Risk of Mortality (PRISM) III score. Intraoperative adverse events were prospectively monitored. Outcomes were analyzed using nonparametric methods and a logistic regression model. A total of 166 patients (RACHS 4-6 [49%]), neonates [50%]) were observed. Sixty-one (37%) had at least 1 intraoperative adverse event, and 47 (28.3%) had at least 1 major postoperative adverse event. There was no correlation between intraoperative adverse events and RACHS, preoperative PRISM III, technical performance score, or postoperative adverse events on multivariate analysis. For the entire cohort, better technical performance score resulted in lower postoperative adverse events, lower postoperative PRISM, and lower length of stay and ventilation time (P < .001). Patients requiring intraoperative revisions fared as well as patients without, provided the technical score was at least adequate. In neonatal and infant open heart repairs, technical performance score is one of the main predictors of postoperative morbidity. Outcomes are not affected by intraoperative adverse events, including surgical revisions, provided technical performance score is at least adequate. Copyright © 2011 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.
30 CFR 700.12 - Petitions to initiate rulemaking.
Code of Federal Regulations, 2010 CFR
2010-07-01
... statement of the facts, technical justification, and law which require issuance, amendment, or repeal of a... of the petition, the Director shall determine if the petition sets forth facts, technical.... Facts, technical justification or law previously considered in a petition or rulemaking on the same...
Can We Predict Technical Aptitude?: A Systematic Review.
Louridas, Marisa; Szasz, Peter; de Montbrun, Sandra; Harris, Kenneth A; Grantcharov, Teodor P
2016-04-01
To identify background characteristics and cognitive tests that may predict surgical trainees' future technical performance, and therefore be used to supplement existing surgical residency selection criteria. Assessment of technical skills is not commonly incorporated as part of the selection process for surgical trainees in North America. Emerging evidence, however, suggests that not all trainees are capable of reaching technical competence. Therefore, incorporating technical aptitude into selection processes may prove useful. A systematic search was carried out of the MEDLINE, PsycINFO, and Embase online databases to identify all studies that assessed associations between surrogate markers of innate technical abilities in surgical trainees, and whether these abilities correlate with technical performance. The quality of each study was evaluated using the Grading of Recommendations, Assessment, Development, and Evaluation system. A total of 8035 records were identified. After screening by title, abstract, and full text, 52 studies were included. Very few surrogate markers were found to predict technical performance. Significant associations with technical performance were seen for 1 of 23 participant-reported surrogate markers, 2 of 25 visual spatial tests, and 2 of 19 dexterity tests. The assessment of trainee Basic Performance Resources predicted technical performance in 62% and 75% of participants. To date, no single test has been shown to reliably predict the technical performance of surgical trainees. Strategies that rely on assessing multiple innate abilities, their interaction, and their relationship with technical skill may ultimately be more likely to serve as reliable predictors of future surgical performance.
Open Archives Initiative (OAI) Services | OSTI, US Dept of Energy Office of
Scientific and Technical Information skip to main content Sign In Create Account OSTI.GOV title logo U.S. Department of Energy Office of Scientific and Technical Information Search terms: Advanced Sign In Create Account This page is being shared by OSTI.GOV. Open Archives Initiative (OAI) Services
ERIC Educational Resources Information Center
Rocker, JoAnne; Roncaglia, George J.; Heimerl, Lynn N.; Nelson, Michael L.
Interoperability and data-exchange are critical for the survival of government information management programs. E-government initiatives are transforming the way the government interacts with the public. More information is to be made available through Web-enabled technologies. Programs such as the NASA's Scientific and Technical Information (STI)…
ERIC Educational Resources Information Center
Hutchinson, Tom; And Others
This curriculum for technical students aims at linking the identity of the learner, his initial linguistic and technical competence, and his expectations with the competence expected of him on entering the technical college. The materials of the curriculum make use of a wide variety of information and data sources such as school-level science…
An Improved Global Wind Resource Estimate for Integrated Assessment Models: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eurek, Kelly; Sullivan, Patrick; Gleason, Michael
This paper summarizes initial steps to improving the robustness and accuracy of global renewable resource and techno-economic assessments for use in integrated assessment models. We outline a method to construct country-level wind resource supply curves, delineated by resource quality and other parameters. Using mesoscale reanalysis data, we generate estimates for wind quality, both terrestrial and offshore, across the globe. Because not all land or water area is suitable for development, appropriate database layers provide exclusions to reduce the total resource to its technical potential. We expand upon estimates from related studies by: using a globally consistent data source of uniquelymore » detailed wind speed characterizations; assuming a non-constant coefficient of performance for adjusting power curves for altitude; categorizing the distance from resource sites to the electric power grid; and characterizing offshore exclusions on the basis of sea ice concentrations. The product, then, is technical potential by country, classified by resource quality as determined by net capacity factor. Additional classifications dimensions are available, including distance to transmission networks for terrestrial wind and distance to shore and water depth for offshore. We estimate the total global wind generation potential of 560 PWh for terrestrial wind with 90% of resource classified as low-to-mid quality, and 315 PWh for offshore wind with 67% classified as mid-to-high quality. These estimates are based on 3.5 MW composite wind turbines with 90 m hub heights, 0.95 availability, 90% array efficiency, and 5 MW/km2 deployment density in non-excluded areas. We compare the underlying technical assumption and results with other global assessments.« less
Multidisciplinary crisis simulations: the way forward for training surgical teams.
Undre, Shabnam; Koutantji, Maria; Sevdalis, Nick; Gautama, Sanjay; Selvapatt, Nowlan; Williams, Samantha; Sains, Parvinderpal; McCulloch, Peter; Darzi, Ara; Vincent, Charles
2007-09-01
High-reliability organizations have stressed the importance of non-technical skills for safety and of regularly providing such training to their teams. Recently safety skills training has been applied in the practice of medicine. In this study, we developed and piloted a module using multidisciplinary crisis scenarios in a simulated operating theatre to train entire surgical teams. Twenty teams participated (n = 80); each consisted of a trainee surgeon, anesthetist, operating department practitioner (ODP), and scrub nurse. Crisis scenarios such as difficult intubation, hemorrhage, or cardiac arrest were simulated. Technical and non-technical skills (leadership, communication, team skills, decision making, and vigilance), were assessed by clinical experts and by two psychologists using relevant technical and human factors rating scales. Participants received technical and non-technical feedback, and the whole team received feedback on teamwork. Trainees assessed the training favorably. For technical skills there were no differences between surgical trainees' assessment scores and the assessment scores of the trainers. However, nurses overrated their technical skill. Regarding non-technical skills, leadership and decision making were scored lower than the other three non-technical skills (communication, team skills, and vigilance). Surgeons scored lower than nurses on communication and teamwork skills. Surgeons and anesthetists scored lower than nurses on leadership. Multidisciplinary simulation-based team training is feasible and well received by surgical teams. Non-technical skills can be assessed alongside technical skills, and differences in performance indicate where there is a need for further training. Future work should focus on developing team performance measures for training and on the development and evaluation of systematic training for technical and non-technical skills to enhance team performance and safety in surgery.
Assessment of technical and nontechnical skills in surgical residents.
Ponton-Carss, Alicia; Kortbeek, John B; Ma, Irene W Y
2016-11-01
Surgical competence encompasses both technical and nontechnical skills. This study seeks to evaluate the validity evidence for a comprehensive surgical skills examination and to examine the relationship between technical and nontechnical skills. Six examination stations assessing both technical and nontechnical skills, conducted yearly for surgical trainees (n = 120) between 2010 and 2014 are included. The assessment tools demonstrated acceptable internal consistency. Interstation reliability for technical skills was low (alpha = .39). Interstation reliability for the nontechnical skills was lower (alpha range -.05 to .31). Nontechnical skills domains were strongly correlated, ranging from r = .65, P < .001 to .86, P < .001. The associations between nontechnical and technical skills were inconsistent, ranging from poor (r = -.06; P = .54) to moderate (r = .45; P < .001). Multiple samplings of integrated technical and nontechnical skills are necessary to assess overall surgical competency. Copyright © 2016 Elsevier Inc. All rights reserved.
48 CFR 2415.305 - Proposal evaluation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... technical portion of each proposal to the TEP Chairperson or his or her designee. The cost/price portion of each proposal shall be retained by the Contracting Officer pending initial technical evaluation by the TEP. (3) Technical evaluation. The TEP shall rate each proposal based on the evaluation factors...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
47 CFR 24.415 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.415 Section 24.415 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... number of general technical requirements. (b) Each application (except applications for initial licenses...
NATIONAL RESPONSE TEAM TECHNICAL ASSISTANCE ...
This document provides technical information on a wide range of activities to aid in response to intentional release of anthrax in urban environments. It includes initial actions when a potential release is discovered, health and safety issues for responders, sampling and analysis methods, decontamination technologies, decontamination waste disposal, and communication with public. This document provides technical information on a wide range of activities to aid in response to intentional release of anthrax in urban environments. It includes initial actions when a potential release is discovered, health and safety issues for responders, sampling and analysis methods, decontamination technologies, decontamination waste disposal, and communication with public.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting frommore » current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.« less
Ory, Marcia G.; Altpeter, Mary; Belza, Basia; Helduser, Janet; Zhang, Chen; Smith, Matthew Lee
2015-01-01
Dissemination and implementation (D&I) frameworks are increasingly being promoted in public health research. However, less is known about their uptake in the field, especially for diverse sets of programs. Limited questionnaires exist to assess the ways that frameworks can be utilized in program planning and evaluation. We present a case study from the United States that describes the implementation of the RE-AIM framework by state aging services providers and public health partners and a questionnaire that can be used to assess the utility of such frameworks in practice. An online questionnaire was developed to capture community perspectives about the utility of the RE-AIM framework. Distributed to project leads in 27 funded states in an evidence-based disease prevention initiative for older adults, 40 key stakeholders responded representing a 100% state-participation rate among the 27 funded states. Findings suggest that there is perceived utility in using the RE-AIM framework when evaluating grand-scale initiatives for older adults. The RE-AIM framework was seen as useful for planning, implementation, and evaluation with relevance for evaluators, providers, community leaders, and policy makers. Yet, the uptake was not universal, and some respondents reported difficulties in use, especially adopting the framework as a whole. This questionnaire can serve as the basis to assess ways the RE-AIM framework can be utilized by practitioners in state-wide D&I efforts. Maximal benefit can be derived from examining the assessment of RE-AIM-related knowledge and confidence as part of a continual quality assurance process. We recommend such an assessment be performed before the implementation of new funding initiatives and throughout their course to assess RE-AIM uptake and to identify areas for technical assistance. PMID:25964897
ERIC Educational Resources Information Center
Staklis, Sandra; Klein, Steven
2010-01-01
Since the mid-1990s, the Pennsylvania Department of Education (PDE) has required all students concentrating in career and technical education (CTE) programs to complete a standardized technical skill assessment at or near the end of their program. Results of technical skill assessments are used for a number of purposes, including recognizing…
Advisory Committee on the Redesign of the Space Station
NASA Astrophysics Data System (ADS)
1993-06-01
The Space Station Program was initiated in 1984 to provide for permanent human presence in an orbiting laboratory. This program evolved into Space Station Freedom, later identified as a component to facilitate a return of astronauts to the Moon, followed by the exploration of Mars. In March 1993 the Clinton Administration directed NASA to undertake an intense effort to redesign the space station at a substantial cost savings relative to Space Station Freedom. The Advisory Committee on the Redesign of the Space Station was established in March 1993 to provide independent assessment of the advantages and disadvantages of the redesign options. The results of the Committee's work is described. Discussion describes the mission that the Administration has articulated for the Space Station Program and the scientific and technical characteristics that a redesigned station must possess to fulfill those objectives. A description of recommended management, operations, and acquisition strategies for the redesigned program is provided. The Committee's assessment of the redesign options against five criteria are presented. The five criteria are technical capabilities, research capabilities, schedule, cost, and risk. A discussion of general mission risk is included.
Advisory Committee on the Redesign of the Space Station
NASA Technical Reports Server (NTRS)
1993-01-01
The Space Station Program was initiated in 1984 to provide for permanent human presence in an orbiting laboratory. This program evolved into Space Station Freedom, later identified as a component to facilitate a return of astronauts to the Moon, followed by the exploration of Mars. In March 1993 the Clinton Administration directed NASA to undertake an intense effort to redesign the space station at a substantial cost savings relative to Space Station Freedom. The Advisory Committee on the Redesign of the Space Station was established in March 1993 to provide independent assessment of the advantages and disadvantages of the redesign options. The results of the Committee's work is described. Discussion describes the mission that the Administration has articulated for the Space Station Program and the scientific and technical characteristics that a redesigned station must possess to fulfill those objectives. A description of recommended management, operations, and acquisition strategies for the redesigned program is provided. The Committee's assessment of the redesign options against five criteria are presented. The five criteria are technical capabilities, research capabilities, schedule, cost, and risk. A discussion of general mission risk is included.
, NREL Technical Report (2017) Energy Assessment Toolkits, NREL Technical Report (2017) Solid-State Lighting Replacement and Maintenance of Lighting Design Goals, NREL Technical Report (2017) Nevada National Security Site 23 Solar and Storage Assessment, NREL Technical Report (2016) Tiller Ranger Station Net Zero
NASA Technical Reports Server (NTRS)
Rocker, JoAnne; Roncaglia, George J.; Heimerl, Lynn N.; Nelson, Michael L.
2002-01-01
Interoperability and data-exchange are critical for the survival of government information management programs. E-government initiatives are transforming the way the government interacts with the public. More information is to be made available through web-enabled technologies. Programs such as the NASA's Scientific and Technical Information (STI) Program Office are tasked to find more effective ways to disseminate information to the public. The NASA STI Program is an agency-wide program charged with gathering, organizing, storing, and disseminating NASA-produced information for research and public use. The program is investigating the use of a new protocol called the Open Archives Initiative (OAI) as a means to improve data interoperability and data collection. OAI promotes the use of the OAI harvesting protocol as a simple way for data sharing among repositories. In two separate initiatives, the STI Program is implementing OAI In collaboration with the Air Force, Department of Energy, and Old Dominion University, the NASA STI Program has funded research on implementing the OAI to exchange data between the three organizations. The second initiative is the deployment of OAI for the NASA technical report server (TRS) environment. The NASA TRS environment is comprised of distributed technical report servers with a centralized search interface. This paper focuses on the implementation of OAI to promote interoperability among diverse data repositories.
Simplified Aircraft-Based Paired Approach: Concept Definition and Initial Analysis
NASA Technical Reports Server (NTRS)
Johnson, Sally C.; Lohr, Gary W.; McKissick, Burnell T.; Abbott, Terence S.; Geurreiro, Nelson M.; Volk, Paul
2013-01-01
Simplified Aircraft-based Parallel Approach (SAPA) is an advanced concept proposed by the Federal Aviation Administration (FAA) to support dependent parallel approach operations to runways with lateral spacing closer than 2500 ft. At the request of the FAA, NASA performed an initial assessment of the potential performance and feasibility of the SAPA concept, including developing and assessing an operational implementation of the concept and conducting a Monte Carlo wake simulation study to examine the longitudinal spacing requirements. The SAPA concept was shown to have significant operational advantages in supporting the pairing of aircraft with dissimilar final approach speeds. The wake simulation study showed that support for dissimilar final approach speeds could be significantly enhanced through the use of a two-phased altitudebased longitudinal positioning requirement, with larger longitudinal positioning allowed for higher altitudes out of ground effect and tighter longitudinal positioning defined for altitudes near and in ground effect. While this assessment is preliminary and there are a number of operational issues still to be examined, it has shown the basic SAPA concept to be technically and operationally feasible.
A Green Campus Culture in Wisconsin
ERIC Educational Resources Information Center
Jorgensen, Haley
2006-01-01
This article features information about the Nicolet Area Technical College in Rhinelander, Wisconsin for preserving the environment as a school-wide initiative. In 2003, Nicolet became the first of the state's 16 technical colleges to embrace a campus-wide focus on renewable energy. In cooperation with the Wisconsin Technical College System…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... which initial and transition flight training must include an in-flight element. Technical Amendment This.... 28471; Amendment Nos. 121-355 and 135-125] RIN 2120-AF08 Training and Qualification Requirements for Check Airmen and Flight Instructors; Technical Amendment AGENCY: Federal Aviation Administration (FAA...
The Technical Communicator as Corporate Spokesperson: A Public Relations Primer.
ERIC Educational Resources Information Center
Troester, Rod; Warburton, Terrence L.
2001-01-01
Examines the changing role of the technical communication professional in the rapidly evolving environment of organizational life. Presents five principles that serve as an initial step in laying a foundation for the preparation of technical communicators for the challenges and opportunities awaiting in contemporary organizations and the…
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
47 CFR 24.815 - Technical content of applications; maintenance of list of station locations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... of list of station locations. 24.815 Section 24.815 Telecommunication FEDERAL COMMUNICATIONS... list of station locations. (a) All applications required by this part shall contain all technical... describe a number of general technical requirements. (b) Each application (except applications for initial...
ERIC Educational Resources Information Center
Washington State Board for Community and Technical Colleges, 2016
2016-01-01
In January 2012, a system-wide task force came together for a nearly year-long process of revising the community and technical college system's performance-based funding (PBF) system, the Student Achievement Initiative. This review was consistent with national experts' recommendations for continuous evaluation of PBF systems to ensure overall…
Assessment of the State-of-the-Art of System-Wide Safety and Assurance Technologies
NASA Technical Reports Server (NTRS)
Roychoudhury, Indranil; Reveley, Mary S.; Phojanamongkolkij, Nipa; Leone, Karen M.
2017-01-01
Since its initiation, the System-wide Safety Assurance Technologies (SSAT) Project has been focused on developing multidisciplinary tools and techniques that are verified and validated to ensure prevention of loss of property and life in NextGen and enable proactive risk management through predictive methods. To this end, four technical challenges have been listed to help realize the goals of SSAT, namely (i) assurance of flight critical systems, (ii) discovery of precursors to safety incidents, (iii) assuring safe human-systems integration, and (iv) prognostic algorithm design for safety assurance. The objective of this report is to provide an extensive survey of SSAT-related research accomplishments by researchers within and outside NASA to get an understanding of what the state-of-the-art is for technologies enabling each of the four technical challenges. We hope that this report will serve as a good resource for anyone interested in gaining an understanding of the SSAT technical challenges, and also be useful in the future for project planning and resource allocation for related research.
Fusion Safety Program annual report, fiscal year 1994
NASA Astrophysics Data System (ADS)
Longhurst, Glen R.; Cadwallader, Lee C.; Dolan, Thomas J.; Herring, J. Stephen; McCarthy, Kathryn A.; Merrill, Brad J.; Motloch, Chester C.; Petti, David A.
1995-03-01
This report summarizes the major activities of the Fusion Safety Program in fiscal year 1994. The Idaho National Engineering Laboratory (INEL) is the designated lead laboratory and Lockheed Idaho Technologies Company is the prime contractor for this program. The Fusion Safety Program was initiated in 1979. Activities are conducted at the INEL, at other DOE laboratories, and at other institutions, including the University of Wisconsin. The technical areas covered in this report include tritium safety, beryllium safety, chemical reactions and activation product release, safety aspects of fusion magnet systems, plasma disruptions, risk assessment failure rate data base development, and thermalhydraulics code development and their application to fusion safety issues. Much of this work has been done in support of the International Thermonuclear Experimental Reactor (ITER). Also included in the report are summaries of the safety and environmental studies performed by the Fusion Safety Program for the Tokamak Physics Experiment and the Tokamak Fusion Test Reactor and of the technical support for commercial fusion facility conceptual design studies. A major activity this year has been work to develop a DOE Technical Standard for the safety of fusion test facilities.
Assessing Students' Technical Skill Attainment
ERIC Educational Resources Information Center
Jorgensen, Haley
2010-01-01
The Wisconsin Technical College System (WTCS) is working to comply with the Carl D. Perkins Career and Technical Education Improvement Act of 2006 (Perkins) to ensure that its graduates have mastered the technical skills needed by business and industry. The legislation requires that each state identify and approve program assessment strategies…
An Input Evaluation of Three Technical Assistance Needs Assessment Strategies.
ERIC Educational Resources Information Center
Suarez, Tanya M.; Cox, James O.
The Technical Assistance Development System--TADS (a project to provide technical assistance to personnel implementing programs for preschool handicapped children and their families) conducted an evaluation of three technical assistance needs assessment strategies during 1979-80. The three strategies were: (1) on-site--conducted by a trained needs…
Brown, Jocelyn; Machen, Heather; Kawaza, Kondwani; Mwanza, Zondiwe; Iniguez, Suzanne; Lang, Hans; Gest, Alfred; Kennedy, Neil; Miros, Robert; Richards-Kortum, Rebecca; Molyneux, Elizabeth; Oden, Maria
2013-01-01
Acute respiratory infections are the leading cause of global child mortality. In the developing world, nasal oxygen therapy is often the only treatment option for babies who are suffering from respiratory distress. Without the added pressure of bubble Continuous Positive Airway Pressure (bCPAP) which helps maintain alveoli open, babies struggle to breathe and can suffer serious complications, and frequently death. A stand-alone bCPAP device can cost $6,000, too expensive for most developing world hospitals. Here, we describe the design and technical evaluation of a new, rugged bCPAP system that can be made in small volume for a cost-of-goods of approximately $350. Moreover, because of its simple design—consumer-grade pumps, medical tubing, and regulators—it requires only the simple replacement of a <$1 diaphragm approximately every 2 years for maintenance. The low-cost bCPAP device delivers pressure and flow equivalent to those of a reference bCPAP system used in the developed world. We describe the initial clinical cases of a child with bronchiolitis and a neonate with respiratory distress who were treated successfully with the new bCPAP device. PMID:23372661
McKenrick, Laurence L; Ii, Keiko; Lawrence, Bill; Kaufmann, Michael; Marshall, Mark
2003-11-01
From January 1, 2000, to August 31, 2001, a team of environmental health specialists from Public Health-Seattle & King County, a partner in King County's Local Hazardous Waste Management Program, made educational visits to 981 automotive repair shops. The purpose was to give the auto repair industry technical assistance on hazardous waste management without using enforcement action. Through site inspections and interviews, the environmental health staff gathered information on the types and amounts of conditionally exempt small-quantity generator (CESQG) hazardous wastes and how they were handled. Proper methods of hazardous waste management, storage, and disposal were discussed with shop personnel. The environmental health staff measured the impact of these educational visits by noting changes made between the initial and follow-up visits. This report focuses on nine major waste streams identified in the auto repair industry. Of the 981 shops visited, 497 were already practicing proper hazardous waste management and disposal. The remaining 484 shops exhibited 741 discrepancies from proper practice. Environmental health staff visited these shops again within six months of the initial visit to assess changes in their practices. The educational visits and technical assistance produced a 76 percent correction of all the discrepancies noted.
Jauregui, Barbara; Janusz, Cara Bess; Clark, Andrew D; Sinha, Anushua; Garcia, Ana Gabriela Felix; Resch, Stephen; Toscano, Cristiana M; Sanderson, Colin; Andrus, Jon Kim
2015-05-07
The Pan American Health Organization (PAHO) created the ProVac Initiative in 2004 with the goal of strengthening national technical capacity to make evidence-based decisions on new vaccine introduction, focusing on economic evaluations. In view of the 10th anniversary of the ProVac Initiative, this article describes its progress and reflects on lessons learned to guide the next phase. We quantified the output of the Initiative's capacity-building efforts and critically assess its progress toward achieving the milestones originally proposed in 2004. Additionally, we reviewed how country studies supported by ProVac have directly informed and strengthened the deliberations around new vaccine introduction. Since 2004, ProVac has conducted four regional workshops and supported 24 health economic analyses in 15 Latin American and Caribbean countries. Five Regional Centers of Excellence were funded, resulting in six operational research projects and nine publications. Twenty four decisions on new vaccine introductions were supported with ProVac studies. Enduring products include the TRIVAC and CERVIVAC cost-effectiveness models, the COSTVAC program costing model, methodological guides, workshop training materials and the OLIVES on-line data repository. Ten NITAGs were strengthened through ProVac activities. The evidence accumulated suggests that initiatives with emphasis on sustainable training and direct support for countries to generate evidence themselves, can help accelerate the introduction of the most valuable new vaccines. International and Regional Networks of Collaborators are necessary to provide technical support and tools to national teams conducting analyses. Timeliness, integration, quality and country ownership of the process are four necessary guiding principles for national economic evaluations to have an impact on policymaking. It would be an asset to have a model that offers different levels of complexity to choose from depending on the vaccine being evaluated, the availability of data, and the time frame of the decision. Decision support for new vaccine introduction in low- and middle-income countries is critical to maximizing the efficiency and impact of vaccination programs. Global technical cooperation will be required. In the future, PAHO and WHO have an opportunity to expand the reach of the ProVac philosophy, models, and methods to additional regions and countries requiring real-time support. The ProVac Global Initiative is proposed as an effective mechanism to do so. Copyright © 2015. Published by Elsevier Ltd.
Beecher, Ned; Harrison, Ellen; Goldstein, Nora; McDaniel, Mary; Field, Patrick; Susskind, Lawrence
2005-01-01
An individual's perception of risk develops from his or her values, beliefs, and experiences. Social scientists have identified factors that affect perceptions of risk, such as whether the risk is knowable (uncertainty), voluntary (can the individual control exposure?), and equitable (how fairly is the risk distributed?). There are measurable differences in how technical experts and citizen stakeholders define and assess risk. Citizen knowledge and technical expertise are both relevant to assessing risk; thus, the 2002 National Research Council panel on biosolids recommended stakeholder involvement in biosolids risk assessments. A survey in 2002 identified some of the factors that influence an individual's perception of the risks involved in a neighbor's use of biosolids. Risk communication was developed to address the gap between experts and the public in knowledge of technical topics. Biosolids management and research may benefit from applications of current risk communication theory that emphasizes (i) two-way communications (dialogue); (ii) that the public has useful knowledge and concerns that need to be acknowledged; and (iii) that what may matter most is the credibility of the purveyor of information and the levels of trustworthiness, fairness, and respect that he or she (or the organization) demonstrates, which can require cultural change. Initial experiences in applying the dialogue and cultural change stages of risk communication theory--as well as consensus-building and joint fact-finding--to biosolids research suggest that future research outcomes can be made more useful to decision-makers and more credible to the broader public. Sharing control of the research process with diverse stakeholders can make research more focused, relevant, and widely understood.
A Perkins Challenge: Assessing Technical Skills in CTE
ERIC Educational Resources Information Center
Stone, James R., III
2009-01-01
Federal law requires state to develop performance measures and data-collection systems for secondary and postsecondary technical-skill attainment. This poses many challenges, such as defining a technical skills, measurement and when to assess students. In this article, the author outlines various assessment models and looks at the challenges…
7 CFR 652.4 - Technical service standards.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must approve all new technologies and innovative practices, including interim standards and specifications, prior to a TSP initiating technical services for those technologies and practices. (c) A TSP must...
Encouraging the learning of hydraulic engineering subjects in agricultural engineering schools
NASA Astrophysics Data System (ADS)
Rodríguez Sinobas, Leonor; Sánchez Calvo, Raúl
2014-09-01
Several methodological approaches to improve the understanding and motivation of students in Hydraulic Engineering courses have been adopted in the Agricultural Engineering School at Technical University of Madrid. During three years student's progress and satisfaction have been assessed by continuous monitoring and the use of 'online' and web tools in two undergraduate courses. Results from their application to encourage learning and communication skills in Hydraulic Engineering subjects are analysed and compared to the initial situation. Student's academic performance has improved since their application, but surveys made among students showed that not all the methodological proposals were perceived as beneficial. Their participation in the 'online', classroom and reading activities was low although they were well assessed.
Technical Assistance Needs Assessments (TANAs)
The Technical Assistance Needs Assessment (TANA) is a process to identify whether a community requires additional support from EPA in order to understand technical information and have meaningful participation in the Superfund decision-making process.
,
1995-01-01
The Intergovernmental Task Force on Monitoring Water Quality (ITFM) prepared this report in collaboration with representatives of all levels of government and the private sector. The report recommends a strategy for nationwide water-quality monitoring and technical monitoring improvements to support sound water-quality decisionmaking. The strategy is intended to achieve a better return on public and private investments in monitoring, environmental protection, and natural resources management. It is also designed to expand the base of information useful to a variety of users at multiple geographic scales. Institutional and technical changes are needed to improve water-quality monitoring and to meet the full range of monitoring requirements. Monitoring must be incorporated as a critical element of program planning, implementation, and evaluation. The strategy includes recommendations in many key elements, such as the development of goal-oriented monitoring and indicators, institutional collaboration, and methods comparability. Initial actions have been taken to implement the strategy. Several Federal agencies have jointly purchased and shared remotely sensed land-cover information needed for water assessment. Major agency data systems are using common data-element names and reference tables that will ensure easy sharing of data. A number of States have held meetings with collectors of water information to initiate statewide monitoring strategies. New monitoring guidance has been developed for Federal water-quality grants to States. Many State offices have changed monitoring programs to place emphasis on priority watersheds and to improve assessment of water quality. As the competition increases for adequate supplies of clean water, concerns about public health and the environment escalate, and more demands are placed on the water information infrastructure. To meet these demands, the collaborative approach has already produced benefits, which will continue to grow as the recommendations are implemented
Ashley, David V M; Walters, Christine; Dockery-Brown, Cheryl; McNab, André; Ashley, Deanna E C
2004-01-01
In 1996 a study found that approximately one in four tourists to Jamaica were affected with traveler's diarrhea (TD) during their stay. That year the Ministry of Health initiated a program for the prevention and control of TD. The aim of this ongoing program was to reduce attack rates of TD from 25% to 12% over a 5-year period by improving the environmental health and food safety standards of hotels. Hotel-based surveillance procedures for TD were implemented in sentinel hotels in Negril and Montego Bay in 1996, Ocho Rios in 1997, and Kingston in 1999. A structured program provided training and technical assistance to nurses, food and beverage staff, and environmental sanitation personnel in the implementation of Hazard Analysis Critical Control Point principles for monitoring food safety standards. The impact of interventions on TD was assessed in a survey of tourists departing from the international airport in Montego Bay in 1997-1998 and from the international airport in Kingston in 1999-2000. The impact of the training and technical assistance program on food safety standards and practices was assessed in hotels in Ocho Rios as of 1998 and in Kingston from 1999. At the end of May 2002, TD incidence rates were 72% lower than in 1996, when the Ministry of Health initiated its program for the prevention and control of TD. Both hotel surveillance data and airport surveillance data suggest that the vast majority of travelers to Kingston and southern regions are not afflicted with TD during their stay. The training and technical assistance program improved compliance to food safety standards over time. Interventions to prevent and control TD in visitors to Jamaica are positively associated with a reduction in TD in the visitor population and improvements in food safety standards and practices in hotels.
Support to X-33/Resusable Launch Vehicle Technology Program
NASA Technical Reports Server (NTRS)
2000-01-01
The X-33 Guidance, Navigation, and Control (GN&C) Peer Review Team (PRT) was formed to assess the integrated X-33 vehicle GN&C system in order to identify any areas of disproportionate risk for initial flight. The eventual scope of the PRT assessment encompasses the GN&C algorithms, software, avionics, control effectors, applicable models, and testing. The initial (phase 1) focus of the PRT was on the GN&C algorithms and the Flight Control Actuation Subsystem (FCAS). The PRT held meetings during its phase 1 assessment at X-33 assembly facilities in Palmdale, California on May 17-18, 2000 and at Honeywell facilities in Tempe, Arizona on June 7, 2000. The purpose of these meetings was for the PRT members to get background briefings on the X-33 vehicle and for the PRT team to be briefed on the design basis and current status of the X-33 GN&C algorithms as well as the FCAS. The following material is covered in this PRT phase 1 final report. Some significant GN&C-related accomplishments by the X-33 development team are noted. Some topics are identified that were found during phase 1 to require fuller consideration when the PRT reconvenes in the future. Some new recommendations by the PRT to the X-33 program will likely result from a thorough assessment of these subjects. An initial list of recommendations from the PRT to the X-33 program is provided. These recommendations stem from topics that received adequate review by the PRT in phase 1. Significant technical observations by the PRT members as a result of the phase 1 meetings are detailed. (These are covered in an appendix.) There were many X-33 development team members who contributed to the technical information used by the PRT during the phase 1 assessment, who supported presentations to the PRT, and who helped to address the many questions posed by the PRT members at and after the phase 1 meetings. In all instances the interaction between the PRT and the X-33 development team members was cordial and very professional. The members of the PRT are grateful for the time and effort applied by all of these individuals and hope that the contents of this report will help to make the X-33 program a success.
Toward a national, sustained U.S. ecosystem assessment
Jackson, Stephen T.; Duke, Clifford S.; Hampton, Stephanie E.; Jacobs, Katharine L.; Joppa, Lucas N.; Kassam, Karim-Aly S. K.; Mooney, Harold A.; Ogden, Laura A.; Ruckelshaus, Mary; Shogren, Jason F.
2016-01-01
The massive investment of resources devoted to monitoring and assessment of economic and societal indicators in the United States is neither matched by nor linked to efforts to monitor and assess the ecosystem services and biodiversity that support economic and social well-being. Although national-scale assessments of biodiversity (1) and ecosystem indicators (2) have been undertaken, nearly a decade has elapsed since the last systematic assessment (2). A 2011 White House report called for a national biodiversity and ecosystem services assessment (3), but the initiative has stalled. Our aim here is to stimulate the process and outline a credible framework and pathway for an ongoing assessment of ecosystem functioning (see the photo). A national assessment should engage diverse stakeholders from multiple sectors of society and should focus on metrics and analyses of direct relevance to policy decisions, from local to national levels. Although many technical or science-focused components are in place, they need to be articulated, distilled, and organized to address policy issues.
Technical Advisory Team (TAT) report on the rocket sled test accident of October 9, 2008.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stofleth, Jerome H.; Dinallo, Michael Anthony; Medina, Anthony J.
2009-01-01
This report summarizes probable causes and contributing factors that led to a rocket motor initiating prematurely while employees were preparing instrumentation for an AIII rocket sled test at SNL/NM, resulting in a Type-B Accident. Originally prepared by the Technical Advisory Team that provided technical assistance to the NNSA's Accident Investigation Board, the report includes analyses of several proposed causes and concludes that the most probable source of power for premature initiation of the rocket motor was the independent battery contained in the HiCap recorder package. The report includes data, evidence, and proposed scenarios to substantiate the analyses.
How to Improve the Design and Delivery of High-Quality Technical Assistance. Newsletter
ERIC Educational Resources Information Center
Center for Comprehensive School Reform and Improvement, 2005
2005-01-01
Educators often use the term technical assistance to define services delivered or received in the pursuit of school- and district-improvement initiatives. More specifically, technical assistance can be defined as any assistance that identifies, selects, or designs research-based solutions and practices to support school improvement (Mattson &…
Renard, Paul G; Vagi, Sara J; Reinold, Chris M; Silverman, Brenda L; Avchen, Rachel N
2017-09-01
To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention's Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success.
2008 technical workshop regarding development of additional guidelines or best practices for planning, implementing and interpreting ecological risk assessments that involve population-level assessment endpoints.
Health information exchange policy and evaluation.
Marchibroda, Janet M
2007-12-01
Concerns about the quality, safety, and cost of healthcare have driven the nation to increase its focus on this issue. A number of states are moving forward-in parallel with federal efforts-to develop and adopt policies for improving health and healthcare through health information technology and electronic health information exchange. Based on the eHealth Initiative's experience providing technical assistance to more than 20 states, and its work related to its coalition of more than 250 state, regional and community-based health information exchange initiatives and organizations, the most difficult challenges facing these initiatives and organizations today is that related to assessing the value of services that emerge from the health information exchange to various stakeholders groups such as providers, payers, and employers, and converting those value assessments to business plans that promote and assure sustainability for these initiatives. The combination of increased federal and state focus and funding and the pace at which regional and community-based health information networks are developing, along with the identification of value and sustainability as some of the most difficult challenges experienced by these efforts, all point to the significant need for evaluation. The most critical evaluation questions focus on the impact of health information technology and health information exchange on quality, safety, efficiency, the value of such efforts for various stakeholders, and assessment of how grant programs can be designed to support positive impact, value, and a sustainable business model, so that efforts continue when the grant funds are fully expended.
Lambden, Simon; DeMunter, Claudine; Dowson, Anne; Cooper, Mehrengise; Gautama, Sanjay; Sevdalis, Nick
2013-06-01
To develop and test the feasibility, reliability, and validity of a practical toolkit for the assessment and feedback of skills required to manage paediatric emergencies in critical care settings. The Imperial Paediatric Emergency Training Toolkit (IPETT) was developed based on current evidence-base and expert input. IPETT assesses both technical and non-technical skills. The technical component covers skills in the areas of clinical assessment, airway and breathing, cardiovascular, and drugs. The non-technical component is based on the validated NOTECHS tool and covers communication and interaction, cooperation and team skills, leadership and managerial skills, and decision-making. The reliability (internal consistency), content validity (inter-correlations between different skills) and concurrent validity (correlations between global technical and non-technical scores) of IPETT were prospectively evaluated in 45 simulated paediatric crises carried out in a PICU with anaesthetic and paediatric trainees (N=52). Non-parametric analyses were carried out. Significance was set at P<0.05. Cronbach alpha reliability coefficients were overall acceptable for the technical (alpha range=0.638-0.810) and good for the non-technical (alpha range=0.701-0.899) component of IPETT. The median inter-skill correlation was rho=0.564 and rho=0.549 for the technical and non-technical components, respectively. These indicate good content validity, as the skills were inter-related but not redundant. We also demonstrate a correlation between the global technical and non-technical scores (rho=0.471) - all Ps<0.05 during the assessments. IPETT offers a psychometrically viable and feasible to use tool in the context of paediatric emergencies training. This study shows that assessment of technical and non-technical skills in combination may offer a more clinically relevant model for training in paediatric emergencies. Further validation should aim to demonstrate skill retention over time and skill transfer from simulation-based training to real emergencies. Copyright © 2013. Published by Elsevier Ireland Ltd.
NASA Technical Reports Server (NTRS)
Zelkin, Natalie; Henriksen, Stephen
2011-01-01
This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.
Multiple-objective evaluation of wastewater treatment plant control alternatives.
Flores-Alsina, Xavier; Gallego, Alejandro; Feijoo, Gumersindo; Rodriguez-Roda, Ignasi
2010-05-01
Besides the evaluation of the environmental issues, the correct assessment of wastewater treatment plants (WWTP) should take into account several objectives such as: economic e.g. operation costs; technical e.g. risk of suffering microbiology-related TSS separation problems; or legal e.g. accomplishment with the effluent standards in terms of the different pollution loads. For this reason, the main objective of this paper is to show the benefits of complementing the environmental assessment carried out by life cycle assessment with economical, technical and legal criteria. Using a preliminary version of the BSM2 as a case study, different combinations of controllers are implemented, simulated and evaluated. In the following step, the resulting multi-criteria matrix is mined using multivariate statistical techniques. The results showed that the presence of an external carbon source addition, the type of aeration system and the TSS controller are the key elements creating the differences amongst the alternatives. Also, it was possible to characterize the different control strategies according to a set of aggregated criteria. Additionally, the existing synergies amongst different objectives and their consequent trade-offs were identified. Finally, it was discovered that from the initial extensive list of evaluation criteria, only a small set of five are really discriminant, being useful to differentiate within the generated alternatives. Copyright 2010 Elsevier Ltd. All rights reserved.
1989-06-01
field width, it will be padded on the left (or right, if the left adjustment indicator has been given) to make up the field width. The padding character...is blank (space) normally, and zero if the field width was specified with a leading zero (this zero does not imply an octal field width). 25 " a...unsigned octal notation (without a leading zero ). ’x The argument is coverted to unsigned hexadecimal notation (without a leading Ox). * u The argument is
NASA Technical Reports Server (NTRS)
Ericsson, Aprille J.
2014-01-01
The seminars invitees include representatives from industry, nonprofit research facility and universities. The presentation provides an overview of the NASAGSFC locations, technical capabilities and applied nanotechnology interests. Initially presented are advances by the broader technological communities on current miniaturized multiscale advanced manufacturing and 3D printing products on the micro and macro scale. Briefly assessed is the potential of moving toward the nanoscale for possible space flight applications and challenges. Lastly, highlighted are GSFCs current successes in nano-technology developments and targeted future applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
1992-01-01
This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Otto, C.A.
1991-12-31
Research conducted in this terminal year of support centered on three distinct areas: mAChR ligand localization in pancreas and the effect of Ca{sup +2} on localization, continuation of assessment of quaternized and neutral mAChR ligands for possible use as PET myocardial imaging agents, and initiation of a study to determine the relationship of the nAChR receptor to the cellular receptor for measles virus. Several tables and figures illustrating the results are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoltenberg, B.; Konz, C.; Mosey, G.
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Fort Ord Army Base (FOAB) site in Marina, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
Asteroid Impacts and Modern Civilization: Can We Prevent a Catastrophe?
NASA Astrophysics Data System (ADS)
Harris, A. W.; Boslough, M.; Chapman, C. R.; Drube, L.; Michel, P.; Harris, A. W.
We are now approaching the level of technical expertise necessary to deflect a near-Earth asteroid (NEA) capable of destroying a large urban area, if not a small country. The current level of activity in the field, including search programs, physical characterization, and international initiatives to assess mitigation strategies, is unprecedented. However, we have only just started to explore the relevant properties of the small end of the NEA population (diameter <300 m), of which the next major impactor is most likely to be a member. The Chelyabinsk event has reminded us that objects as small as 20 m, about which we know very little, impact frequently and are a serious threat to life and property. Political awareness and international response efforts are still at a very primitive stage. For a global guarantee of protection, advances in scientific and technical competence must be matched by improvements in international coordination, as well as preparedness at the political level.
NASA Technical Reports Server (NTRS)
Hochstetler, Ron; Chachad, Girish; Melton, John
2016-01-01
In April, 2015 NASA Ames Research Center conducted a study of the airship industry. The project called for a report that would describe airship concepts proposed or projects initiated, airship performance or capability targets, and the missions these activities were addressing. It would detail the principal technical features of these airships; the proposed value/advantages of the features, notional concepts of operation, and challenges associated with the vehicles. Also investigated would be the current status and near-term prospects of these airship development activities, whether they are active or, if curtailed the circumstances and possible reasons for that conclusion including technical, business, or other mitigating factors. For the most active programs an assessment would be conducted to identify the resources or activities required for airships to advance to series construction and operational deployment. The study would also identify impediments to these developments and deployments, with recommendations provided to address existing issues in the airship industry today.
ERIC Educational Resources Information Center
Pugh, Debra; Hamstra, Stanley J.; Wood, Timothy J.; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges
2015-01-01
Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal…
Use of System Safety Risk Assessments for the Space Shuttle Reusable Solid Rocket Motor (RSRM)
NASA Technical Reports Server (NTRS)
Greenhalgh, Phillip O.; McCool, Alex (Technical Monitor)
2001-01-01
This paper discusses the System Safety approach used to assess risk for the Space Shuttle Reusable Solid Rocket Motor (RSRM). Previous to the first RSRM flight in the fall of 1988, all systems were analyzed extensively to assure that hazards were identified, assessed and that the baseline risk was understood and appropriately communicated. Since the original RSRM baseline was established, Thiokol and NASA have implemented a number of initiatives that have further improved the RSRM. The robust design, completion of rigorous testing and flight success of the RSRM has resulted in a wise reluctance to make changes. One of the primary assessments required to accompany the documentation of each proposed change and aid in the decision making process is a risk assessment. Documentation supporting proposed changes, including the risk assessments from System Safety, are reviewed and assessed by Thiokol and NASA technical management. After thorough consideration, approved changes are implemented adding improvements to and reducing risk of the Space Shuttle RSRM.
Approval of Modified Seating Systems Initially Approved Under A Technical Standard Order
DOT National Transportation Integrated Search
1997-06-03
The Advisory Circular (AC) provides information, clarification, and procedural : guidance concerning the approval and installation of modified Technical Standard : Order (TSO) seating systems in U.S. type certificated aircraft.
NASA scientific and technical information program multimedia initiative
NASA Technical Reports Server (NTRS)
Cotter, Gladys A.; Kaye, Karen
1993-01-01
This paper relates the experiences of the NASA Scientific and Technical Information Program in introducing multimedia within the STI Program framework. A discussion of multimedia technology is included to provide context for the STI Program effort. The STI Program's Multimedia Initiative is discussed in detail. Parallels and differences between multimedia and traditional information systems project development are highlighted. Challenges faced by the program in initiating its multimedia project are summarized along with lessons learned. The paper concludes with a synopsis of the benefits the program hopes to provide its users through the introduction of multimedia illustrated by examples of successful multimedia projects.
Technical Feasibility Assessment of Lunar Base Mission Scenarios
NASA Astrophysics Data System (ADS)
Magelssen, Trygve ``Spike''; Sadeh, Eligar
2005-02-01
Investigation of the literature pertaining to lunar base (LB) missions and the technologies required for LB development has revealed an information gap that hinders technical feasibility assessment. This information gap is the absence of technical readiness levels (TRL) (Mankins, 1995) and information pertaining to the criticality of the critical enabling technologies (CETs) that enable mission success. TRL is a means of identifying technical readiness stages of a technology. Criticality is defined as the level of influence the CET has on the mission scenario. The hypothesis of this research study is that technical feasibility is a function of technical readiness and technical readiness is a function of criticality. A newly developed research analysis method is used to identify the technical feasibility of LB mission scenarios. A Delphi is used to ascertain technical readiness levels and CET criticality-to-mission. The research analysis method is applied to the Delphi results to determine the technical feasibility of the LB mission scenarios that include: observatory, science research, lunar settlement, space exploration gateway, space resource utilization, and space tourism. The CETs identified encompasses four major system level technologies of: transportation, life support, structures, and power systems. Results of the technical feasibility assessment show the observatory and science research LB mission scenarios to be more technical ready out of all the scenarios, but all mission scenarios are in very close proximity to each other in regard to criticality and TRL and no one mission scenario stands out as being absolutely more technically ready than any of the other scenarios. What is significant and of value are the Delphi results concerning CET criticality-to-mission and the TRL values evidenced in the Tables that can be used by anyone assessing the technical feasibility of LB missions.
Ni Mhuircheartaigh, Neasa; Coffey, Louise; Fleming, Hannah; O' Doherty, Ann; McNally, Sorcha
2017-09-01
To determine if the routine use of spot compression mammography is now obsolete in the assessment of screen detected masses, asymmetries and architectural distortion since the availability of digital breast tomosynthesis. We introduced breast tomosynthesis in the workup of screen detected abnormalities in our screening center in January 2015. During an initial learning period with tomosynthesis standard spot compression views were also performed. Three consultant breast radiologists retrospectively reviewed all screening mammograms recalled for assessment over the first 6-month period. We assessed retrospectively whether there was any additional diagnostic information obtained from spot compression views not already apparent on tomography. All cases were also reviewed for any additional lesions detected by tomosynthesis, not detected on routine 2-view screening mammography. 548 women screened with standard 2-view digital screening mammography were recalled for assessment in the selected period and a total of 565 lesions were assessed. 341 lesions were assessed by both tomosynthesis and routine spot compression mammography. The spot compression view was considered more helpful than tomosynthesis in only one patient. This was because the breast was inadequately positioned for tomosynthesis and the area in question was not adequately imaged. Apart from this technical error there was no asymmetry, distortion or mass where spot compression provided more diagnostic information than tomosynthesis alone. We detected three additional cancers on tomosynthesis, not detected by routine screening mammography. From our initial experience with tomosynthesis we conclude that spot compression mammography is now obsolete in the assessment of screen detected masses, asymmetries and distortions where tomosynthesis is available. © 2017 Wiley Periodicals, Inc.
Technical Guidance for Assessing Environmental Justice in Regulatory Analysis
The Technical Guidance for Assessing Environmental Justice in Regulatory Analysis (also referred to as the Environmental Justice Technical Guidance or EJTG) is intended for use by Agency analysts, including risk assessors, economists, and other analytic staff that conduct analyse...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiatreungwattana, K.; Geiger, J.; Healey, V.
2013-03-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Tronox Facility site in Savannah, Georgia, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Healey, V.
2013-04-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Brisbane Baylands site in Brisbane, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olis, D.; Salasovich, J.; Mosey, G.
2013-04-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Snohomish County Cathcart Landfill Site in Snohomish County, Washington, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simon, J.; Mosey, G.
2013-01-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Sky Park Landfill site in Eau Claire, Wisconsin, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Mosey, G.
2013-06-01
The U.S. Environmental Protection Agency (EPA), Region 5, in accordance with the RE-Powering America's Land initiative, selected the Kolthoff Landfill site in Cleveland, Ohio, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simon, J.; Mosey, G.
2013-01-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Kerr McGee site in Columbus, Mississippi, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiatreungwattana, K.; Geiger, J.; Healey, V.
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Chino Mine site in Silver City, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geiger, J.; Lisell, L.; Mosey, G.
2013-10-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative through the Region 6 contract, selected Ft. Hood Army Base in Killeen, Texas, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for possible photovoltaic (PV) system installations and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
The in-depth safety assessment (ISA) pilot projects in Ukraine.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kot, C. A.
1998-02-10
Ukraine operates pressurized water reactors of the Soviet-designed type, VVER. All Ukrainian plants are currently operating with annually renewable permits until they update their safety analysis reports (SARs). After approval of the SARS by the Ukrainian Nuclear Regulatory Authority, the plants will be granted longer-term operating licenses. In September 1995, the Nuclear Regulatory Authority and the Government Nuclear Power Coordinating Committee of Ukraine issued a new contents requirement for the safety analysis reports of VVERs in Ukraine. It contains requirements in three major areas: design basis accident (DBA) analysis, probabilistic risk assessment (PRA), and beyond design-basis accident (BDBA) analysis. Themore » DBA requirements are an expanded version of the older SAR requirements. The last two requirements, on PRA and BDBA, are new. The US Department of Energy (USDOE), through the International Nuclear Safety Program (INSP), has initiated an assistance and technology transfer program to Ukraine to assist their nuclear power stations in developing a Western-type technical basis for the new SARS. USDOE sponsored In-Depth Safety Assessments (ISAs) have been initiated at three pilot nuclear reactor units in Ukraine, South Ukraine Unit 1, Zaporizhzhya Unit 5, and Rivne Unit 1. USDOE/INSP have structured the ISA program in such a way as to provide maximum assistance and technology transfer to Ukraine while encouraging and supporting the Ukrainian plants to take the responsibility and initiative and to perform the required assessments.« less
Assessment of undiscovered, technically recoverable oil and gas resources of Armenia, 2014
Klett, Timothy R.; Schenk, Christopher J.; Wandrey, Craig J.; Brownfield, Michael E.; Charpentier, Ronald R.; Tennyson, Marilyn E.; Gautier, Donald L.
2014-01-01
Using a geology-based assessment methodology, the U.S. Geological Survey estimated mean volumes of 1 million barrels of undiscovered, technically recoverable conventional oil and 6 billion cubic feet of undiscovered, technically recoverable conventional natural gas in Armenia.
TADS Needs Assessment Procedures Manual, Summer 1980.
ERIC Educational Resources Information Center
Black, Talbot; And Others
The TADS (Technical Assistance Development System) Needs Assessment Manual is designed to guide the comprehensive review of Handicapped Children's Early Education Program (HCEEP) demonstration projects in identifying technical assistance needs. An introduction reviews the TADS technical assistance model which includes program planning, needs…
Omidvar, Mohsen; Mazloumi, Adel; Mohammad Fam, Iraj; Nirumand, Fereshteh
2017-01-01
Resilience engineering (RE) can be an alternative technique to the traditional risk assessment and management techniques, to predict and manage safety conditions of modern socio-technical organizations. While traditional risk management approaches are retrospective and highlight error calculation and computation of malfunction possibilities, resilience engineering seeks ways to improve capacity at all levels of organizations in order to build strong yet flexible processes. Considering the resilience potential measurement as a concern in complex working systems, the aim of this study was to quantify the resilience by the help of fuzzy sets and Multi-Criteria Decision-Making (MCDM) techniques. In this paper, we adopted the fuzzy analytic hierarchy process (FAHP) method to measure resilience in a gas refinery plant. A resilience assessment framework containing six indicators, each with its own sub-indicators, was constructed. Then, the fuzzy weights of the indicators and the sub-indicators were derived from pair-wise comparisons conducted by experts. The fuzzy evaluating vectors of the indicators and the sub-indicators computed according to the initial assessment data. Finally, the Comprehensive Resilience Index (CoRI), Resilience Grade (RG), and Resilience Early Warning Grade (REWG) were established. To demonstrate the applicability of the proposed method, an illustrative example in a gas refinery complex (an instance of socio-technical systems) was provided. CoRI of the refinery ranked as "III". In addition, for the six main indicators, RG and REWG ranked as "III" and "NEWZ", respectively, except for C3, in which RG ranked as "II", and REWG ranked as "OEWZ". The results revealed the engineering practicability and usefulness of the proposed method in resilience evaluation of socio-technical systems.
Assessment Program Technical Progress Report, 1996-1997.
ERIC Educational Resources Information Center
McCown, Laurie; Fanning, Erin; Eickmeyer, Barbara
Coconino Community College (CCC) annually assesses its institutional effectiveness to demonstrate its commitment to improving programs and services to students. The 1996-97 Assessment Program Technical Progress Report records the assessment and institutional activities enacted during the academic year, detailing the assessment model, timelines,…
NASA Astrophysics Data System (ADS)
Koenig, A. A.; Braithwaite, J. W.; Armijo, J. R.
1988-05-01
Given its potential benefits, the practicality of using a latent heat-storage material as the basis for a passive thermal management system is being assessed by Chloride Silent Power Ltd. (CSPL) with technical assistance from Beta Power, Inc. and Sandia National Laboratories (SNL). Based on the experience gained in large-scale solar energy storage programs, fused salts were selected as the primary candidates for the heat-storage material. The initial phase of this assessment was directed to an EV battery being designed at CSPL for the ETX-II program. Specific tasks included the identification and characterization of potential fused salts, a determination of placement options for the salts within the battery, and an assessment of the ultimate benefit to the battery system. The results obtained to date for each of these tasks are presented in this paper.
Silano, Marco; Silano, Vittorio
2017-07-03
A priority of the European Union is the control of risks possibly associated with chemical contaminants in food and undesirable substances in feed. Following an initial chapter describing the main contaminants detected in food and undesirable substances in feed in the EU, their main sources and the factors which affect their occurrence, the present review focuses on the "continous call for data" procedure that is a very effective system in place at EFSA to make possible the exposure assessment of specific contaminants and undesirable substances. Risk assessment of contaminants in food atances in feed is carried currently in the European Union by the CONTAM Panel of EFSA according to well defined methodologies and in collaboration with competent international organizations and with Member States.
DOE Office of Scientific and Technical Information (OSTI.GOV)
This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
NASA Technical Reports Server (NTRS)
Abell, Paul A.; Rivkin, Andy S.
2014-01-01
The joint ESA and NASA Asteroid Impact and Deflection Assessment (AIDA) mission will directly address aspects of NASA's Asteroid Initiative and will contribute to future human exploration. The NASA Asteroid Initiative is comprised of two major components: the Grand Challenge and the Asteroid Mission. The first component, the Grand Challenge, focuses on protecting Earth's population from asteroid impacts by detecting potentially hazardous objects with enough warning time to either prevent them from impacting the planet, or to implement civil defense procedures. The Asteroid Mission, involves sending astronauts to study and sample a near-Earth asteroid (NEA) prior to conducting exploration missions of the Martian system, which includes Phobos and Deimos. AIDA's primary objective is to demonstrate a kinetic impact deflection and characterize the binary NEA Didymos. The science and technical data obtained from AIDA will aid in the planning of future human exploration missions to NEAs and other small bodies. The dual robotic missions of AIDA, ESA's Asteroid Impact Monitor (AIM) and NASA's Double Asteroid Redirection Test (DART), will provide a great deal of technical and engineering data on spacecraft operations for future human space exploration while conducting in-depth scientific examinations of the binary target Didymos both prior to and after the kinetic impact demonstration. The knowledge gained from this mission will help identify asteroidal physical properties in order to maximize operational efficiency and reduce mission risk for future small body missions. The AIDA data will help fill crucial strategic knowledge gaps concerning asteroid physical characteristics that are relevant for human exploration considerations at similar small body destinations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hakime, Antoine, E-mail: thakime@yahoo.com; Yevich, Steven; Tselikas, Lambros
PurposeTo assess whether fusion imaging-guided percutaneous microwave ablation (MWA) can improve visibility and targeting of liver metastasis that were deemed inconspicuous on ultrasound (US).Materials and MethodsMWA of liver metastasis not judged conspicuous enough on US was performed under CT/US fusion imaging guidance. The conspicuity before and after the fusion imaging was graded on a five-point scale, and significance was assessed by Wilcoxon test. Technical success, procedure time, and procedure-related complications were evaluated.ResultsA total of 35 patients with 40 liver metastases (mean size 1.3 ± 0.4 cm) were enrolled. Image fusion improved conspicuity sufficiently to allow fusion-targeted MWA in 33 patients. The time requiredmore » for image fusion processing and tumors’ identification averaged 10 ± 2.1 min (range 5–14). Initial conspicuity on US by inclusion criteria was 1.2 ± 0.4 (range 0–2), while conspicuity after localization on fusion imaging was 3.5 ± 1 (range 1–5, p < 0.001). Technical success rate was 83% (33/40) in intention-to-treat analysis and 100% in analysis of treated tumors. There were no major procedure-related complications.ConclusionsFusion imaging broadens the scope of US-guided MWA to metastasis lacking adequate conspicuity on conventional US. Fusion imaging is an effective tool to increase the conspicuity of liver metastases that were initially deemed non visualizable on conventional US imaging.« less
Assessment of Scaled Rotors for Wind Tunnel Experiments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maniaci, David Charles; Kelley, Christopher Lee; Chiu, Phillip
2015-07-01
Rotor design and analysis work has been performed to support the conceptualization of a wind tunnel test focused on studying wake dynamics. This wind tunnel test would serve as part of a larger model validation campaign that is part of the Department of Energy Wind and Water Power Program’s Atmosphere to electrons (A2e) initiative. The first phase of this effort was directed towards designing a functionally scaled rotor based on the same design process and target full-scale turbine used for new rotors for the DOE/SNL SWiFT site. The second phase focused on assessing the capabilities of an already available rotor,more » the G1, designed and built by researchers at the Technical University of München.« less
ECASTAR: Energy conservation. An assessment of systems, technologies and requirements
NASA Technical Reports Server (NTRS)
1975-01-01
A methodology was presented for a systems approach to energy conservation actions and their potentials and impacts in the United States. Constraints affecting the approach were ranked, and the most important ones are the present economic and technical conditions. The following unresolved issues were identified: consumptive lifestyles vs. conservation ethic, environmental standards vs. energy conservation, capital availability, decentralization and vertical integration vs. centralization, fuel rich regions vs. fuel poor regions, supply vs. end use conservation, life cycle costing vs. initial cost, mandatory savings vs. voluntary savings, labor intensive vs. capital intensive, price control vs. free market. The following recommendations were made: provide action/impact assessment, establish regional energy centers, improve technology articulation with government, design total energy systems, utilize existing systems approach expertise.
ERIC Educational Resources Information Center
Walsh, John
2011-01-01
The upgrading of higher technical education which began in the 1960s marked the most influential intervention by the Irish government in the third-level sector since the establishment of the independent Irish state. A series of reforming initiatives extended educational opportunity and transformed the status of technical education at higher level.…
Not just trust: factors influencing learners' attempts to perform technical skills on real patients.
Bannister, Susan L; Dolson, Mark S; Lingard, Lorelei; Keegan, David A
2018-06-01
As part of their training, physicians are required to learn how to perform technical skills on patients. The previous literature reveals that this learning is complex and that many opportunities to perform these skills are not converted into attempts to do so by learners. This study sought to explore and understand this phenomenon better. A multi-phased qualitative study including ethnographic observations, interviews and focus groups was conducted to explore the factors that influence technical skill learning. In a tertiary paediatric emergency department, staff physician preceptors, residents, nurses and respiratory therapists were observed in the delivery and teaching of technical skills over a 3-month period. A constant comparison methodology was used to analyse the data and to develop a constructivist grounded theory. We conducted 419 hours of observation, 18 interviews and four focus groups. We observed 287 instances of technical skills, of which 27.5% were attempted by residents. Thematic analysis identified 14 factors, grouped into three categories, which influenced whether residents attempted technical skills on real patients. Learner factors included resident initiative, perceived need for skill acquisition and competing priorities. Teacher factors consisted of competing priorities, interest in teaching, perceived need for residents to acquire skills, attributions about learners, assessments of competency, and trust. Environmental factors were competition from other learners, judgement that the patient was appropriate, buy-in from team members, consent from patient or caregivers, and physical environment constraints. Our findings suggest that neither the presence of a learner in a clinical environment nor the trust of the supervisor is sufficient to ensure the learner will attempt a technical skill. We characterise this phenomenon as representing a pool of opportunities to conduct technical skills on live patients that shrinks to a much smaller pool of technical skill attempts. Learners, teachers and educators can use this knowledge to maximise the number of attempts learners make to perform technical skills on real patients. © 2018 John Wiley & Sons Ltd and The Association for the Study of Medical Education.
Vagi, Sara J.; Reinold, Chris M.; Silverman, Brenda L.; Avchen, Rachel N.
2017-01-01
Objectives. To evaluate and describe outcomes of state and local medical countermeasure preparedness planning, which is critical to ensure rapid distribution and dispensing of a broad spectrum of life-saving medical assets during a public health emergency. Methods. We used 2007 to 2014 state and local data collected from the Centers for Disease Control and Prevention’s Technical Assistance Review. We calculated descriptive statistics from 50 states and 72 local Cities Readiness Initiative jurisdictions that participated in the Technical Assistance Review annually. Results. From 2007 to 2014, the average overall Technical Assistance Review score increased by 13% for states and 41% for Cities Readiness Initiative jurisdictions. In 2014, nearly half of states achieved the maximum possible overall score (100), and 94% of local Cities Readiness Initiative jurisdictions achieved a score of 90 or more. Conclusions. Despite challenges, effective and timely medical countermeasure distribution and dispensing is possible with appropriate planning, staff, and resources. However, vigilance in training, exercising, and improving plans from lessons learned in a sustained, coordinated way is critical to ensure continued public health preparedness success. PMID:28892441
Renewable Energy Technical Potential | Geospatial Data Science | NREL
Technical Potential Renewable Energy Technical Potential The renewable energy technical potential level from Resource to Technical to Economic to Market. The benefit of assessing technical potential is potential-resource, technical, economic, and market-as shown in the graphic with key assumptions. Technical
Controller evaluation of initial data link terminal air traffic control services : final report
DOT National Transportation Integrated Search
1991-01-01
This document details the results the first Federal Aviation Administration : Technical Center investigation of the initial terminal air traffic control : services developed for transmission using Data Link technology. Initial Data : Link services we...
Sharma, Anjali; Chiliade, Philippe; Michael Reyes, E; Thomas, Kate K; Collens, Stephen R; Rafael Morales, José
2013-12-13
In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs' strengths and needs for technical assistance. This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement.
Sharma, Anjali; Chiliade, Philippe; Reyes, E. Michael; Thomas, Kate K.; Collens, Stephen R.; Morales, José Rafael
2013-01-01
Background In 2008, the US government mandated that HIV/AIDS care and treatment programs funded by the US President's Emergency Plan for AIDS Relief (PEPFAR) should shift from US-based international partners (IPs) to registered locally owned organizations (local partners, or LPs). The US Health Resources and Services Administration (HRSA) developed the Clinical Assessment for Systems Strengthening (ClASS) framework for technical assistance in resource-constrained settings. The ClASS framework involves all stakeholders in the identification of LPs’ strengths and needs for technical assistance. Objective This article examines the role of ClASS in building capacity of LPs that can endure and adapt to changing financial and policy environments. Design All stakeholders (n=68) in Kenya, Zambia, and Nigeria who had participated in the ClASS from LPs and IPs, the US Centers for Disease Control and Prevention (CDC), and, in Nigeria, HIV/AIDS treatment facilities (TFs) were interviewed individually or in groups (n=42) using an open-ended interview guide. Thematic analysis revealed stakeholder perspectives on ClASS-initiated changes and their sustainability. Results Local organizations were motivated to make changes in internal operations with the ClASS approach, PEPFAR's competitive funding climate, organizational goals, and desired patient health outcomes. Local organizations drew on internal resources and, if needed, technical assistance from IPs. Reportedly, ClASS-initiated changes and remedial action plans made LPs more competitive for PEPFAR funding. LPs also attributed their successful funding applications to their preexisting systems and reputation. Bureaucracy, complex and competing tasks, and staff attrition impeded progress toward the desired changes. Although CDC continues to provide technical assistance through IPs, declining PEPFAR funds threaten the consolidation of gains, smooth program transition, and continuity of treatment services. Conclusions The well-timed adaptation and implementation of ClASS successfully engaged stakeholders who committed their own resources toward strengthening organizational capacity. The sustainability of built capacity depends on continued investment in leadership, staff retention, and quality improvement. PMID:24331715
Kaliyadan, Antony G; Chawla, Harnish; Fischman, David L; Ruggiero, Nicholas; Gannon, Michael; Walinsky, Paul; Savage, Michael P
2017-02-01
This study assessed the impact of adjunct delivery techniques on the deployment success of distal protection filters in saphenous vein grafts (SVGs). Despite their proven clinical benefit, distal protection devices are underutilized in SVG interventions. Deployment of distal protection filters can be technically challenging in the presence of complex anatomy. Techniques that facilitate the delivery success of these devices could potentially improve clinical outcomes and promote greater use of distal protection. Outcomes of 105 consecutive SVG interventions with attempted use of a FilterWire distal protection device (Boston Scientific) were reviewed. In patients in whom filter delivery initially failed, the success of attempted redeployment using adjunct delivery techniques was assessed. Two strategies were utilized sequentially: (1) a 0.014" moderate-stiffness hydrophilic guidewire was placed first to function as a parallel buddy wire to support subsequent FilterWire crossing; and (2) if the buddy-wire approach failed, predilation with a 2.0 mm balloon at low pressure was performed followed by reattempted filter delivery. The study population consisted of 80 men and 25 women aged 73 ± 10 years. Mean SVG age was 14 ± 6 years. Complex disease (American College of Cardiology/American Heart Association class B2 or C) was present in 92%. Initial delivery of the FilterWire was successful in 82/105 patients (78.1%). Of the 23 patients with initial failed delivery, 8 (35%) had successful deployment with a buddy wire alone, 7 (30%) had successful deployment with balloon predilation plus buddy wire, 4 (17%) had failed reattempt at deployment despite adjunct maneuvers, and in 4 (17%) no additional attempts at deployment were made at the operator's discretion. Deployment failure was reduced from 21.9% initially to 7.6% after use of adjunct delivery techniques (P<.01). No adverse events were observed with these measures. Deployment of distal protection devices can be technically difficult with complex SVG disease. Adjunct delivery techniques are important to optimize deployment success of distal protection filters during SVG intervention.
NASA Technical Reports Server (NTRS)
Tripp, John S.; Tcheng, Ping; Burner, Alpheus W.; Finley, Tom D.
1999-01-01
The first International Symposium on Strain Gauge Balances was sponsored under the auspices of the NASA Langley Research Center (LaRC), Hampton, Virginia during October 22-25, 1996. Held at the LaRC Reid Conference Center, the Symposium provided an open international forum for presentation, discussion, and exchange of technical information among wind tunnel test technique specialists and strain gauge balance designers. The Symposium also served to initiate organized professional activities among the participating and relevant international technical communities. The program included a panel discussion, technical paper sessions, tours of local facilities, and vendor exhibits. Over 130 delegates were in attendance from 15 countries. A steering committee was formed to plan a second international balance symposium tentatively scheduled to be hosted in the United Kingdom in 1998 or 1999. The Balance Symposium was followed by the half-day Workshop on Angle of Attack and Model Deformation on the afternoon of October 25. The thrust of the Workshop was to assess the state of the art in angle of attack (AoA) and model deformation measurement techniques and to discuss future developments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Powell, J.R.; Fillo, J.A.; Twining, B.G.
1975-08-01
The first volume of these Proceedings is devoted to summarizing the results of the activities of the five technical area Study Groups. These Study Groups played a major role in the Workshop since it was their mission to identify key research and development requirements in their technical areas, etimate the prospects for success of research and development projects directed toward fulfilling these requirements, and determine appropriate time scales for the initiation and completion of these efforts. The determination of which new scientific and technological knowledge, data, and techniques will be required to achieve the Division of Magnetic Fusion Energy programmore » goals, and the construction of an evaluated compilation of research and development needs along with suggestions for levels of effort needed to achieve these goals were among the objectives of the Study Groups. The Conclusions and Recommendations of the Study Groups are summaries of the individual Study Group's findings prepared by the chairmen and co-chairmen/secretaries. These findings were presented to all the Workshop participants in a plenary session, and the discussion and comments on the findings are included in this volume.« less
NASA Technical Reports Server (NTRS)
Sutter, James K.; Leidecker, Henning W.; Panda, Binayak; Piascik, Robert S.; Muirhead, Brian K.; Peeler, Debra
2009-01-01
The NESC eras requested by the NASA Jet Propulsion Laboratory (JPL) to conduct an independent review of the Mars Reconnaissance Orbiter (MRO) Thermal/Vacuum (T/V) Anomaly Assessment. Because the anomaly resulted in the surface contamination of the MRO, selected members of the Materials Super Problem Resolution Team (SPRT) and the NASA technical community having technical expertise relative to contamination issues were chosen for the independent review. The consultation consisted of a review of the MRO Project's reported response to the assessment findings, a detailed review of JPL technical assessment final report, and detailed discussions with the JPL assessment team relative to their findings.
Initial experience of using high field strength intraoperative MRI for neurosurgical procedures.
Raheja, Amol; Tandon, Vivek; Suri, Ashish; Sarat Chandra, P; Kale, Shashank S; Garg, Ajay; Pandey, Ravindra M; Kalaivani, Mani; Mahapatra, Ashok K; Sharma, Bhawani S
2015-08-01
We report our initial experience to optimize neurosurgical procedures using high field strength intraoperative magnetic resonance imaging (IOMRI) in 300 consecutive patients as high field strength IOMRI rapidly becomes the standard of care for neurosurgical procedures. Three sequential groups (groups A, B, C; n=100 each) were compared with respect to time management, complications and technical difficulties to assess improvement in these parameters with experience. We observed a reduction in the number of technical difficulties (p<0.001), time to induction (p<0.001) and total anesthesia time (p=0.007) in sequential groups. IOMRI was performed for neuronavigation guidance (n=252) and intraoperative validation of extent of resection (EOR; n=67). Performing IOMRI increased the EOR over and beyond the primary surgical attempt in 20.5% (29/141) and 18% (11/61) of patients undergoing glioma and pituitary surgery, respectively. Overall, EOR improved in 59.7% of patients undergoing IOMRI (40/67). Intraoperative tractography and real time navigation using re-uploaded IOMRI images (accounting for brain shift) helps in intraoperative planning to reduce complications. IOMRI is an asset to neurosurgeons, helping to augment the EOR, especially in glioma and pituitary surgery, with no significant increase in morbidity to the patient. Copyright © 2015 Elsevier Ltd. All rights reserved.
Organizational Cost of Quality Improvement for Depression Care
Liu, Chuan-Fen; Rubenstein, Lisa V; Kirchner, JoAnn E; Fortney, John C; Perkins, Mark W; Ober, Scott K; Pyne, Jeffrey M; Chaney, Edmund F
2009-01-01
Objective We documented organizational costs for depression care quality improvement (QI) to develop an evidence-based, Veterans Health Administration (VA) adapted depression care model for primary care practices that performed well for patients, was sustained over time, and could be spread nationally in VA. Data Sources and Study Setting Project records and surveys from three multistate VA administrative regions and seven of their primary care practices. Study Design Descriptive analysis. Data Collection We documented project time commitments and expenses for 86 clinical QI and 42 technical expert support team participants for 4 years from initial contact through care model design, Plan–Do–Study–Act cycles, and achievement of stable workloads in which models functioned as routine care. We assessed time, salary costs, and costs for conference calls, meetings, e-mails, and other activities. Principle Findings Over an average of 27 months, all clinics began referring patients to care managers. Clinical participants spent 1,086 hours at a cost of $84,438. Technical experts spent 2,147 hours costing $197,787. Eighty-five percent of costs derived from initial regional engagement activities and care model design. Conclusions Organizational costs of the QI process for depression care in a large health care system were significant, and should be accounted for when planning for implementation of evidence-based depression care. PMID:19146566
Non-technical skills assessment for prelicensure nursing students: An integrative review.
Pires, Sara; Monteiro, Sara; Pereira, Anabela; Chaló, Daniela; Melo, Elsa; Rodrigues, Alexandre
2017-11-01
In nursing, non-technical skills are recognized as playing an important role to increase patient safety and successful clinical outcomes (Pearson and McLafferty, 2011). Non-technical skills are cognitive and social resource skills that complement technical skills and contribute to safe and efficient task performance (Flin et al., 2008). In order to effectively provide non-technical skills training, it is essential to have an instrument to measure these skills. An online search was conducted. Articles were selected if they referred to and/or described instruments assessing non-technical skills for nurses and/or prelicensure nursing students in educational, clinical and/or simulated settings with validation evidence (inclusion criteria). Of the 53 articles located, 26 met the inclusion criteria. Those referred to and/or described 16 instruments with validation evidence developed to assess non-technical skills in multidisciplinary teams including nurses. Although articles have shown 16 valid and reliable instruments, to our knowledge, no instrument has been published or developed and validated for the assessment of non-technical skills of only nurses in general, relevant for use in high-fidelity simulation-based training for prelicensure nursing students. Therefore, there is a need for the development of such an instrument. Copyright © 2017 Elsevier Ltd. All rights reserved.
Fecso, A B; Kuzulugil, S S; Babaoglu, C; Bener, A B; Grantcharov, T P
2018-03-30
The operating theatre is a unique environment with complex team interactions, where technical and non-technical performance affect patient outcomes. The correlation between technical and non-technical performance, however, remains underinvestigated. The purpose of this study was to explore these interactions in the operating theatre. A prospective single-centre observational study was conducted at a tertiary academic medical centre. One surgeon and three fellows participated as main operators. All patients who underwent a laparoscopic Roux-en-Y gastric bypass and had the procedures captured using the Operating Room Black Box ® platform were included. Technical assessment was performed using the Objective Structured Assessment of Technical Skills and Generic Error Rating Tool instruments. For non-technical assessment, the Non-Technical Skills for Surgeons (NOTSS) and Scrub Practitioners' List of Intraoperative Non-Technical Skills (SPLINTS) tools were used. Spearman rank-order correlation and N-gram statistics were conducted. Fifty-six patients were included in the study and 90 procedural steps (gastrojejunostomy and jejunojejunostomy) were analysed. There was a moderate to strong correlation between technical adverse events (r s = 0·417-0·687), rectifications (r s = 0·380-0·768) and non-technical performance of the surgical and nursing teams (NOTSS and SPLINTS). N-gram statistics showed that after technical errors, events and prior rectifications, the staff surgeon and the scrub nurse exhibited the most positive non-technical behaviours, irrespective of operator (staff surgeon or fellow). This study demonstrated that technical and non-technical performances are related, on both an individual and a team level. Valuable data can be obtained around intraoperative errors, events and rectifications. © 2018 BJS Society Ltd Published by John Wiley & Sons Ltd.
Relative importance of physical and economic factors in Appalachian coalbed gas assessment
Attanasi, E.D.
1998-01-01
In the 1995 National Assessment of Oil and Gas Resources prepared by the U.S. Geological Survey, only 20% of the assessed technically recoverable Appalachian Province coalbed gas resources were economic. Physical and economic variables are examined to explain the disparity between economic and technically recoverable coalbed gas. The Anticline and Syncline plays of the Northern Appalachian Basin, which account for 77% of the assessed technically recoverable coalbed gas, are not economic. Analysis shows marginal reductions in costs or rate of return will not turn these plays into commercial successes. Physical parameters that determine ultimate well recoverability and the rate of gas recovery are primary reasons the Northern Appalachian Basin plays are non-commercial. If the application of new well stimulation technology could offset slow gas desorption rates, Appalachian Province economic gas could increase to more then 70% of the technically recoverable gas. Similarly, if operators are able to develop strategies to selectively drill plays by avoiding dry holes and non-commercial occurrences, the economic fraction of technically recoverable gas could increase to over half.In the 1995 National Assessment of Oil and Gas Resources prepared by the U.S. Geological Survey, only 20% of the assessed technically recoverable Appalachian Province coalbed gas resources were economic. Physical and economic variables are examined to explain the disparity between economic and technically recoverable coalbed gas. The Anticline and Syncline plays of the Northern Appalachian Basin, which account for 77% of the assessed technically recoverable coalbed gas, are not economic. Analysis shows marginal reductions in costs or rate of return will not turn these plays into commercial successes. Physical parameters that determine ultimate well recoverability and the rate of gas recovery are primary reasons the Northern Appalachian Basin plays are non-commercial. If the application of new well stimulation technology could offset slow gas desorption rates, Appalachian Province economic gas could increase to more then 70% of the technically recoverable gas. Similarly, if operators are able to develop strategies to selectively drill plays by avoiding dry holes and non-commercial occurrences, the economic fraction of technically recoverable gas could increase to over half.
Defense Acquisition Research Journal. Volume 24, Number 1, Issue 80, January 2017
2017-01-01
call 703-960-6802 or 800-755-8805, or e-mail dauaa2@aol.com. ISSUE 80 JANUARY 2017 VOL. 24 NO. 1 1 We’re on the Web at: http://www.dau.mil...technical proposals, use white papers as an initial screen- ing process. The initial screening based solely on technical merit will help industry and...mda.mil) Dr. Thomas A . Mazzuchi is cha ir of the Department of Engineering Management and Systems Engineering in the School of Engineering and Applied
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hayes, D.F.; Schroeder, P.R.
This technical note documents the SETTLE computer program which facilitates the design of a confined disposal facility (CDF) to retain solids, provide initial storage, and meet effluent discharge limitations for suspended solids during a dredged matenal disposal operation. Detailed information can be found in Engineer Manual 1110-2-5027, Confined Dredged Material Disposal. SETTLE is a part of the Automated Dredging and Disposal Alternatives Management System (ADDAMS).
McCrary, Hilary C; Faucett, Erynne A; Hurbon, Audriana N; Milinic, Tijana; Cervantes, Jose A; Kent, Sean L; Adamas-Rappaport, William J
2017-07-01
Objective The aim of our study is to determine if a fresh cadaver model (FCM) for the instruction of ultrasound (US)-guided fine-needle aspiration (FNA) of thyroid nodules is a practical method for instruction. Study Design Pre- and postinstruction assessment of medical students' ability to perform US-guided FNA of artificially created thyroid nodules placed adjacent to the thyroid gland of a fresh cadaver. Setting University-based fresh cadaver laboratory. Subjects and Methods Study participants included a total of 17 first- and second-year medical students with minimal US training. Technical skills were assessed using a 10-item checklist. In addition, a cognitive assessment regarding the indications, contraindications, and complications of the procedure was completed. A postinstruction assessment was provided for participants 5 weeks after their initial assessment. Differences between pre- and postinstruction assessment scores of technical skills were analyzed using McNemar's test. The mean cognitive knowledge gain was analyzed using a paired 2-sample t test. Results Eight of 10 items on the skills checklist were statistically significant between pre- and postinstruction skills assessment ( P < .05). There was a statistically significant change in cognitive knowledge gain regarding the contraindications of the procedure ( P = .001), but not for indications or complications ( P = .104 and P = .111, respectively). Conclusion US-guided FNA continues to be an important diagnostic procedure in the workup of thyroid nodules, making it an essential skill to integrate into surgical skills lab. Our FCM for the instruction of US-guided FNA is the first of its kind, and this pilot study shows this is a viable method for instruction.
Non-technical skills assessment in surgery.
Sharma, Bharat; Mishra, Amit; Aggarwal, Rajesh; Grantcharov, Teodor P
2011-09-01
Adverse events in surgery have highlighted the importance of non-technical skills, such as communication, decision-making, teamwork, situational awareness and leadership, to effective organizational performance. These skills carry particular importance to surgical oncology, as members of a multidisciplinary team must work cohesively to formulate effective patient care plans. Several non-technical skills evaluation tools have been developed for use in surgery, without adequate comparison and consensus on which should be standard for training. Eleven articles describing the use of three non-technical evaluation tools related to surgery: NOTSS (Non Technical Skills for Surgeons), NOTECHS (Non Technical Skills) and OTAS (Observational Teamwork Assessment for Surgery) were analyzed with respect to scale formulation, validity, reliability and feasibility. Furthermore, their use in training thus far and the future of non-technical rating scales in surgical curricula was discussed. Future work should focus on incorporating these assessment tools into training and into a real operating room setting to provide formative evaluations for surgical residents. Copyright © 2010 Elsevier Ltd. All rights reserved.
Jaffer, U; Singh, P; Pandey, V A; Aslam, M; Standfield, N J
2014-01-01
Duplex ultrasound facilitates bedside diagnosis and hence timely patient care. Its uptake has been hampered by training and accreditation issues. We have developed an assessment tool for Duplex arterial stenosis measurement for both simulator and patient based training. A novel assessment tool: duplex ultrasound assessment of technical skills was developed. A modified duplex ultrasound assessment of technical skills was used for simulator training. Novice, intermediate experience and expert users of duplex ultrasound were invited to participate. Participants viewed an instructional video and were allowed ample time to familiarize with the equipment. Participants' attempts were recorded and independently assessed by four experts using the modified duplex ultrasound assessment of technical skills. 'Global' assessment was also done on a four point Likert scale. Content, construct and concurrent validity as well as reliability were evaluated. Content and construct validity as well as reliability were demonstrated. The simulator had good satisfaction rating from participants: median 4; range 3-5. Receiver operator characteristic analysis has established a cut point of 22/ 34 and 25/ 40 were most appropriate for simulator and patient based assessment respectively. We have validated a novel assessment tool for duplex arterial stenosis detection. Further work is underway to establish transference validity of simulator training to improved skill in scanning patients. We have developed and validated duplex ultrasound assessment of technical skills for simulator training.
Consider Vocational-Technical Education for Post-Secondary Education
ERIC Educational Resources Information Center
Mupinga, Davison M.; Livesay, Kelly
2004-01-01
In an era when the highest paying and most readily available jobs seem to be in the technical and medical arenas, it may not be worth initially pursuing a four-year degree when a one or two-year training program will do. It may make more sense to pursue a technical degree to become self-sufficient first and then later explore career dreams and…
MacEwan, Matthew J; Dudek, Nancy L; Wood, Timothy J; Gofton, Wade T
2016-01-01
CONSTRUCT: The Ottawa Surgical Competency Operating Room Evaluation (O-SCORE) is a 9-item surgical evaluation tool designed to assess technical competence in surgical trainees using behavioral anchors. The initial development of the O-SCORE produced evidence for valid results. Further work is required to determine if the use of a single surgeon or an unblinded rater introduces bias. In addition, the relationship of the O-SCORE to other currently used technical assessment tools should be explored to provide validity evidence related to the relationship to other measures. We have designed this project to provide continued validity evidence for the O-SCORE related to these two issues. Nineteen residents and 2 staff Orthopedic Surgeons from the University of Ottawa volunteered to participate in a 2-part OSCE style station. Participants completed a written questionnaire followed by a videotaped 10-minute simulated open reduction and internal fixation of a midshaft radius fracture. Videos were rated individually by 2 blinded staff orthopedic surgeons using an Objective Structured Assessment of Technical Skills (OSATS) global rating scale, an OSATS checklist, and the O-SCORE in random order. O-SCORE results appeared sensitive to surgical training level even when raters were blinded. In addition, strong agreement between two independent observers using the O-SCORE suggests that the measure captures a performance easily recognized by surgical observers. Ratings on the O-SCORE also were strongly associated with global ratings on the currently most validated technical evaluation tool (OSATS). Collectively, these results suggest that the O-SCORE generates accurate, reproducible, and meaningful results when used in a randomized and blinded fashion, providing continued validity evidence for using this tool to evaluate surgical trainee competence. The O-SCORE was able to differentiate surgical trainee level using blinded raters providing further evidence of validity for the O-SCORE. There was strong agreement between two independent observers using the O-SCORE. Ratings on the O-SCORE also demonstrated equivalence to scores on the most validated technical evaluation tool (OSATS). These results suggest that the O-SCORE demonstrates accurate and reproducible results when used in a randomized and blinded fashion providing continued validity evidence for this tool in the evaluation of surgical competence in the trainees.
NASA Technical Reports Server (NTRS)
Price, K. M.; Russell, P.; Weyandt, C.
1988-01-01
The NASA space station has the potential to provide significant economic benefits to commercial communications satellite operators. The initial reports qunatified the benefits of space-based activities and assessed the impacts on the satellite design and the space station. Results are given for the following additional tasks: quantify the value of satellite retrievability operations and define its operational aspects; evaluate the use of expendable launch vehicles for transportation of satellites from the Earth to the space station; and quantify the economic value of modular satellites that are assembled and serviced in space.
A Government/Industry Summary of the Design Analysis Methods for Vibrations (DAMVIBS) Program
NASA Technical Reports Server (NTRS)
Kvaternik, Raymond G. (Compiler)
1993-01-01
The NASA Langley Research Center in 1984 initiated a rotorcraft structural dynamics program, designated DAMVIBS (Design Analysis Methods for VIBrationS), with the objective of establishing the technology base needed by the rotorcraft industry for developing an advanced finite-element-based dynamics design analysis capability for vibrations. An assessment of the program showed that the DAMVIBS Program has resulted in notable technical achievements and major changes in industrial design practice, all of which have significantly advanced the industry's capability to use and rely on finite-element-based dynamics analyses during the design process.
Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hirsch, Brian; Burman, Kari; Davidson, Carolyn
2015-06-30
Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.
Assimilation of enterprise technology upgrades: a factor-based study
NASA Astrophysics Data System (ADS)
Claybaugh, Craig C.; Ramamurthy, Keshavamurthy; Haseman, William D.
2017-02-01
The purpose of this study is to gain a better understanding of the differences in the propensity of firms to initiate and commit to the assimilation of an enterprise technology upgrade. A research model is proposed that examines the influences that four technological and four organisational factors have on predicting assimilation of a technology upgrade. Results show that firms with a greater propensity to assimilate the new enterprise resource planning (ERP) version have a higher assessment of relative advantage, IS technical competence, and the strategic role of IS relative to those firms with a lower propensity to assimilate a new ERP version.
Pugh, Debra; Hamstra, Stanley J; Wood, Timothy J; Humphrey-Murto, Susan; Touchie, Claire; Yudkowsky, Rachel; Bordage, Georges
2015-03-01
Internists are required to perform a number of procedures that require mastery of technical and non-technical skills, however, formal assessment of these skills is often lacking. The purpose of this study was to develop, implement, and gather validity evidence for a procedural skills objective structured clinical examination (PS-OSCE) for internal medicine (IM) residents to assess their technical and non-technical skills when performing procedures. Thirty-five first to third-year IM residents participated in a 5-station PS-OSCE, which combined partial task models, standardized patients, and allied health professionals. Formal blueprinting was performed and content experts were used to develop the cases and rating instruments. Examiners underwent a frame-of-reference training session to prepare them for their rater role. Scores were compared by levels of training, experience, and to evaluation data from a non-procedural OSCE (IM-OSCE). Reliability was calculated using Generalizability analyses. Reliabilities for the technical and non-technical scores were 0.68 and 0.76, respectively. Third-year residents scored significantly higher than first-year residents on the technical (73.5 vs. 62.2%) and non-technical (83.2 vs. 75.1%) components of the PS-OSCE (p < 0.05). Residents who had performed the procedures more frequently scored higher on three of the five stations (p < 0.05). There was a moderate disattenuated correlation (r = 0.77) between the IM-OSCE and the technical component of the PS-OSCE scores. The PS-OSCE is a feasible method for assessing multiple competencies related to performing procedures and this study provides validity evidence to support its use as an in-training examination.
Palinkas, Lawrence A; Campbell, Mark; Saldana, Lisa
2018-01-01
Background: This study examined influences on the decisions of administrators of youth-serving organizations to initiate and proceed with implementation of an evidence-based practice (EBP). Methods: Semi-structured interviews, developed using the Stages of Implementation Completion (SIC) as a framework, were conducted with 19 agency chief executive officers and program directors of 15 organizations serving children and adolescents. Results: Agency leaders' self-assessments of implementation feasibility and desirability prior to implementation (Pre-implementation) were influenced by intervention affordability, feasibility, requirements, validity, reliability, relevance, cost savings, positive outcomes, and adequacy of information; availability of funding, support from sources external to the agency, and adequacy of technical assistance; and staff availability and attitudes toward innovation in general and EBPs in particular, organizational capacity, fit between the EBP and agency mission and capacity, prior experience with implementation, experience with seeking evidence, and developing consensus. Assessments during the Implementation phase included intervention flexibility and requirements; availability of funding, adequacy of training and technical assistance, and getting sufficient and appropriate referrals; and staffing and implementing with fidelity. Assessments during the Sustainment phase included intervention costs and benefits; availability of funding, support from sources outside of the agency, and need for the EBP; and the fit between the EBP and the agency mission. Discussion: The results point to opportunities for using agency leader models to develop strategies to facilitate implementation of evidence-based and innovative practices for children and adolescents. The SIC provides a standardized framework for guiding agency leader self-assessments of implementation.
Palinkas, Lawrence A.; Campbell, Mark; Saldana, Lisa
2018-01-01
Background: This study examined influences on the decisions of administrators of youth-serving organizations to initiate and proceed with implementation of an evidence-based practice (EBP). Methods: Semi-structured interviews, developed using the Stages of Implementation Completion (SIC) as a framework, were conducted with 19 agency chief executive officers and program directors of 15 organizations serving children and adolescents. Results: Agency leaders' self-assessments of implementation feasibility and desirability prior to implementation (Pre-implementation) were influenced by intervention affordability, feasibility, requirements, validity, reliability, relevance, cost savings, positive outcomes, and adequacy of information; availability of funding, support from sources external to the agency, and adequacy of technical assistance; and staff availability and attitudes toward innovation in general and EBPs in particular, organizational capacity, fit between the EBP and agency mission and capacity, prior experience with implementation, experience with seeking evidence, and developing consensus. Assessments during the Implementation phase included intervention flexibility and requirements; availability of funding, adequacy of training and technical assistance, and getting sufficient and appropriate referrals; and staffing and implementing with fidelity. Assessments during the Sustainment phase included intervention costs and benefits; availability of funding, support from sources outside of the agency, and need for the EBP; and the fit between the EBP and the agency mission. Discussion: The results point to opportunities for using agency leader models to develop strategies to facilitate implementation of evidence-based and innovative practices for children and adolescents. The SIC provides a standardized framework for guiding agency leader self-assessments of implementation. PMID:29896471
75 FR 28778 - Broadband Initiatives Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... DEPARTMENT OF AGRICULTURE Rural Utilities Service RIN 0572-ZA01 Broadband Initiatives Program AGENCY: Rural Utilities Service, Department of Agriculture. ACTION: Notice of Extension of filing Public... Initiatives Program (BIP), published in the Federal Register at 75 FR 3820 (January 22, 2010). Such technical...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kiatreungwattana, K.; Geiger, J.; Healey, V.
2013-04-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Peru Mill Industrial Park site in the City of Deming, New Mexico, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simon, J.; Mosey, G.
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Vermont Asbestos Group (VAG) Mine site in Eden, Vermont, and Lowell, Vermont, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, James; Geiger, Jesse W.; Mosey, Gail
2014-01-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the TechCity East Campus site in Kingston, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this study is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Mosey, G.
2013-04-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Former Bethlehem Steel Plant site in Lackawanna, New York, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stoltenberg, B.; Konz, C.; Mosey, G.
2013-03-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Crazy Horse Landfill site in Salinas, California, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, operation and maintenance requirements, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
NASA Technical Reports Server (NTRS)
Horsham, Gary A. P.
1999-01-01
This paper presents a comprehensive review and assessment of a demonstration technology transfer and commercialization prouram called "CommTech". The pro-ram was conceived and initiated in early to mid-fiscal year 1995, and extended roughly three years into the future. Market research sources were used to initially gather primary technological problems and needs data from non-aerospace companies in three targeted industry sectors: environmental, surface transportation, and bioengineering. Company-supplied information served as input data to activate or start-up an internal, phased matchmaking process. This process was based on technical-level relationship exploration followed by business-level agreement negotiations. and culminated with project management and execution. Space Act Agreements represented near-term outputs. Company product or process commercialization derived from NASA Glenn support and measurable economic effects represented far-term outputs.
Programmatic management of multidrug-resistant tuberculosis: models from three countries.
Furin, J; Bayona, J; Becerra, M; Farmer, P; Golubkov, A; Hurtado, R; Joseph, J K; Keshavjee, S; Ponomarenko, O; Rich, M; Shin, S
2011-10-01
Although multidrug-resistant tuberculosis (MDR-TB) is a major global health problem, there is a gap in programmatic treatment implementation. This study describes MDR-TB treatment models in three countries--Peru, Russia and Lesotho-- using qualitative data collected over a 13-year period. A program analysis is presented for each country focusing on baseline medical care, initial implementation and program evolution. A pattern analysis revealed six overarching themes common to all three programs: 1) importance of baseline assessments, 2) early identification of key collaborators, 3) identification of initial locus of care, 4) minimization of patient-incurred costs, 5) targeted interventions for vulnerable populations and 6) importance of technical assistance and funding. Site commonalities and differences in each of these areas were analyzed. It is recommended that all programs providing MDR-TB treatment address these six areas during program development and implementation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Salasovich, J.; Geiger, J.; Mosey, G.
2013-06-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Standard Chlorine of Delaware site in Delaware City, Delaware, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess the site for a possible photovoltaic (PV) system installation and estimate the cost, performance, and site impacts of different PV options. In addition, the report recommends financing options that could assist in the implementation of a PV system at the site.
State Practices in the Assessment of Outcomes for Students with Disabilities. Technical Report.
ERIC Educational Resources Information Center
Shriner, James G.; And Others
This technical report describes the methodology, results, and conclusions of a 1991 survey, which was conducted to determine state efforts to develop systems to assess educational outcomes, states' needs for solutions to technical/implementation problems, existing databases, and efforts of states to design a comprehensive system of indicators in…
78 FR 35877 - Applications for New Awards; Native Hawaiian Career and Technical Education Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... attain career and technical skills; (7) The use of student assessment and evaluation data to improve... the industry the student is preparing to enter; (iv) Activities, during the formative stages of the... students' technical assessments, by type and scores, if available; (vii) The rates of attainment of a...
Training and Maintaining System-Wide Reliability in Outcome Management.
Barwick, Melanie A; Urajnik, Diana J; Moore, Julia E
2014-01-01
The Child and Adolescent Functional Assessment Scale (CAFAS) is widely used for outcome management, for providing real time client and program level data, and the monitoring of evidence-based practices. Methods of reliability training and the assessment of rater drift are critical for service decision-making within organizations and systems of care. We assessed two approaches for CAFAS training: external technical assistance and internal technical assistance. To this end, we sampled 315 practitioners trained by external technical assistance approach from 2,344 Ontario practitioners who had achieved reliability on the CAFAS. To assess the internal technical assistance approach as a reliable alternative training method, 140 practitioners trained internally were selected from the same pool of certified raters. Reliabilities were high for both practitioners trained by external technical assistance and internal technical assistance approaches (.909-.995, .915-.997, respectively). 1 and 3-year estimates showed some drift on several scales. High and consistent reliabilities over time and training method has implications for CAFAS training of behavioral health care practitioners, and the maintenance of CAFAS as a global outcome management tool in systems of care.
Goldenberg, Mitchell G; Lee, Jason Y; Kwong, Jethro C C; Grantcharov, Teodor P; Costello, Anthony
2018-03-31
To systematically review and synthesise the validity evidence supporting intraoperative and simulation-based assessments of technical skill in urological robot-assisted surgery (RAS), and make evidence-based recommendations for the implementation of these assessments in urological training. A literature search of the Medline, PsycINFO and Embase databases was performed. Articles using technical skill and simulation-based assessments in RAS were abstracted. Only studies involving urology trainees or faculty were included in the final analysis. Multiple tools for the assessment of technical robotic skill have been published, with mixed sources of validity evidence to support their use. These evaluations have been used in both the ex vivo and in vivo settings. Performance evaluations range from global rating scales to psychometrics, and assessments are carried out through automation, expert analysts, and crowdsourcing. There have been rapid expansions in approaches to RAS technical skills assessment, both in simulated and clinical settings. Alternative approaches to assessment in RAS, such as crowdsourcing and psychometrics, remain under investigation. Evidence to support the use of these metrics in high-stakes decisions is likely insufficient at present. © 2018 The Authors BJU International © 2018 BJU International Published by John Wiley & Sons Ltd.
Operational Initiative Review Report of The Small Business Development Center Initiative.
ERIC Educational Resources Information Center
Orr-Carpenter, Deborah
This document discusses the Small Business Development Center initiative which addresses the needs of California businesses to grow through the delivery of one-on-one counseling, seminars, workshops, conferences, and other technical activities. The community colleges host 21 full centers. Some of the major objectives of the initiative are the…
Non-advanced Further Education.
ERIC Educational Resources Information Center
Alsop, M.
1986-01-01
Traces the history of post-secondary technical education (referred to as "further education") in the United Kingdom. Considers its present position in relation to other branches of the education system. Outlines some recent initiatives which have produced the present structure and content of technical education. (TW)
25 CFR 163.62 - Annual funding needs assessment and rating.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Annual funding needs assessment and rating. 163.62 Section... REGULATIONS Alaska Native Technical Assistance Program § 163.62 Annual funding needs assessment and rating. (a) Each year, the Secretary will request a technical assistance project needs assessment from ANCSA...
25 CFR 163.62 - Annual funding needs assessment and rating.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Annual funding needs assessment and rating. 163.62... FORESTRY REGULATIONS Alaska Native Technical Assistance Program § 163.62 Annual funding needs assessment and rating. (a) Each year, the Secretary will request a technical assistance project needs assessment...
25 CFR 163.62 - Annual funding needs assessment and rating.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Annual funding needs assessment and rating. 163.62... FORESTRY REGULATIONS Alaska Native Technical Assistance Program § 163.62 Annual funding needs assessment and rating. (a) Each year, the Secretary will request a technical assistance project needs assessment...
25 CFR 163.62 - Annual funding needs assessment and rating.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Annual funding needs assessment and rating. 163.62... FORESTRY REGULATIONS Alaska Native Technical Assistance Program § 163.62 Annual funding needs assessment and rating. (a) Each year, the Secretary will request a technical assistance project needs assessment...
25 CFR 163.62 - Annual funding needs assessment and rating.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Annual funding needs assessment and rating. 163.62... FORESTRY REGULATIONS Alaska Native Technical Assistance Program § 163.62 Annual funding needs assessment and rating. (a) Each year, the Secretary will request a technical assistance project needs assessment...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koenig, A.A.; Braithwaite, J.W.; Armijo, J.R.
Given its potential benefits, the practicality of using a latent heat-storage material as the basis for a passive thermal management system is being assessed by Chloride Silent Power Ltd. (CSPL) with technical assistance from Beta Power, Inc. and Sandia National Laboratories (SNL). Based on the experience gained in large-scale solar energy storage programs, fused salts were selected as the primary candidates for the heat-storage material. The initial phase of this assessment was directed to an EV battery being designed at CSPL for the ETX-II program. Specific tasks included the identification and characterization of potential fused salts, a determination of placementmore » options for the salts within the battery, and an assessment of the ultimate benefit to the battery system. The results obtained to date for each of these tasks are presented in this paper.« less
Simulation for ward processes of surgical care.
Pucher, Philip H; Darzi, Ara; Aggarwal, Rajesh
2013-07-01
The role of simulation in surgical education, initially confined to technical skills and procedural tasks, increasingly includes training nontechnical skills including communication, crisis management, and teamwork. Research suggests that many preventable adverse events can be attributed to nontechnical error occurring within a ward context. Ward rounds represent the primary point of interaction between patient and physician but take place without formalized training or assessment. The simulated ward should provide an environment in which processes of perioperative care can be performed safely and realistically, allowing multidisciplinary assessment and training of full ward rounds. We review existing literature and describe our experience in setting up our ward simulator. We examine the facilities, equipment, cost, and personnel required for establishing a surgical ward simulator and consider the scenario development, assessment, and feedback tools necessary to integrate it into a surgical curriculum. Copyright © 2013 Elsevier Inc. All rights reserved.
Bae, Jay P; Justice, Paul G
2002-01-01
In order to contain the cost of pharmaceuticals while preserving access to medically necessary drugs, Georgia state government competitively selected a single vendor in May of 2000 to manage combined pharmacy benefits under all of the state's health programs. By initiating this procedure, it intended to maximize the state's purchasing power and improve efficiency while streamlining the administrative structure. Synthesizing information from the request for proposal (RFP) and technical proposals submitted by 11 pharmacy benefit managers (PBMs) in response, we describe a model of public sector PBM contracting approach and present an assessment of the industry's service capability and performance statistics. Payers who have been using PBM services may find it interesting to compare their experience with the recent Georgia experience. Those who are considering contracting with a PBM will find the assessment of the PBM industry timely and informative.
Malhotra, Saurabh; Sobieraj, Diana M; Mann, April; Parker, Matthew W
2017-12-22
Background/Objectives: The specific credentials and continuing education (CME/CE) of nuclear cardiology laboratory medical and technical staff are important factors in the delivery of quality imaging services that have not been systematically evaluated. Methods: Nuclear cardiology accreditation application data from the Intersocietal Accreditation Commission (IAC) was used to characterize facilities performing myocardial perfusion imaging by setting, size, previous accreditation and credentials of the medical and technical staff. Credentials and CME/CE were compared against initial accreditation decisions (grant or delay) using multivariable logistic regression. Results: Complete data were available for 1913 nuclear cardiology laboratories from 2011-2014. Laboratories with initial positive accreditation decisions had a greater prevalence of Certification Board in Nuclear Cardiology (CBNC) certified medical directors and specialty credentialed technical directors. Certification and credentials of the medical and technical directors, respectively, staff CME/CE compliance, and assistance of a consultant with the application were positively associated with accreditation decisions. Conclusion: Nuclear cardiology laboratories directed by CBNC-certified physicians and NCT- or PET-credentialed technologists were less likely to receive delay decisions for MPI. CME/CE compliance of both the medical and technical directors was associated with accreditation decision. Medical and technical directors' years of experience were not associated with accreditation decision. Copyright © 2017 by the Society of Nuclear Medicine and Molecular Imaging, Inc.
de Montbrun, Sandra; Roberts, Patricia L; Satterthwaite, Lisa; MacRae, Helen
2016-07-01
To implement the Colorectal Objective Structured Assessment of Technical skill (COSATS) into American Board of Colon and Rectal Surgery (ABCRS) certification and build evidence of validity for the interpretation of the scores of this high stakes assessment tool. Currently, technical skill assessment is not a formal component of board certification. With the technical demands of surgical specialties, documenting competence in technical skill at the time of certification with a valid tool is ideal. In September 2014, the COSATS was a mandatory component of ABCRS certification. Seventy candidates took the examination, with their performance evaluated by expert colorectal surgeons using a task-specific checklist, global rating scale, and overall performance scale. Passing scores were set and compared using 2 standard setting methodologies, using a compensatory and conjunctive model. Inter-rater reliability and the reliability of the pass/fail decision were calculated using Cronbach alpha and Subkoviak methodology, respectively. Overall COSATS scores and pass/fail status were compared with results on the ABCRS oral examination. The pass rate ranged from 85.7% to 90%. Inter-rater reliability (0.85) and reliability of the pass/fail decision (0.87 and 0.84) were high. A low positive correlation (r= 0.25) was seen between the COSATS and oral examination. All individuals who failed the COSATS passed the ABCRS oral examination. COSATS is the first technical skill examination used in national surgical board certification. This study suggests that the current certification process may be failing to identify individuals who have demonstrated technical deficiencies on this standardized assessment tool.
Ohtake, Patricia J; Lazarus, Marcilene; Schillo, Rebecca; Rosen, Michael
2013-02-01
Rehabilitation of patients in critical care environments improves functional outcomes. This finding has led to increased implementation of intensive care unit (ICU) rehabilitation programs, including early mobility, and an associated increased demand for physical therapists practicing in ICUs. Unfortunately, many physical therapists report being inadequately prepared to work in this high-risk environment. Simulation provides focused, deliberate practice in safe, controlled learning environments and may be a method to initiate academic preparation of physical therapists for ICU practice. The purpose of this study was to examine the effect of participation in simulation-based management of a patient with critical illness in an ICU setting on levels of confidence and satisfaction in physical therapist students. A one-group, pretest-posttest, quasi-experimental design was used. Physical therapist students (N=43) participated in a critical care simulation experience requiring technical (assessing bed mobility and pulmonary status), behavioral (patient and interprofessional communication), and cognitive (recognizing a patient status change and initiating appropriate responses) skill performance. Student confidence and satisfaction were surveyed before and after the simulation experience. Students' confidence in their technical, behavioral, and cognitive skill performance increased from "somewhat confident" to "confident" following the critical care simulation experience. Student satisfaction was highly positive, with strong agreement the simulation experience was valuable, reinforced course content, and was a useful educational tool. Limitations of the study were the small sample from one university and a control group was not included. Incorporating a simulated, interprofessional critical care experience into a required clinical course improved physical therapist student confidence in technical, behavioral, and cognitive performance measures and was associated with high student satisfaction. Using simulation, students were introduced to the critical care environment, which may increase interest in working in this practice area.
Park, Se Woo; Lee, Hyuk; Park, Jun Chul; Shin, Sung Kwan; Lee, Sang Kil; Lee, Yong Chan
2014-03-01
Conventional endoscopy for self-expandable metallic stent (SEMS) placement may be technically limited in long and tortuous strictures. Therefore, we analyzed the feasibility, safety and usefulness of ultrathin endoscopy (UTE)-guided SEMS placement. This study involved 24 patients with upper gastrointestinal obstruction and unsuccessful initial attempts to place SEMS using conventional endoscopy. After completely passing a UTE across the stricture, the UTE was withdrawn, leaving a guidewire placed via the working channel. Through-the-scope SEMS placement was done using a conventional endoscope inserted along the guidewire. The primary endpoints were assessed by technical/clinical success and stent patency duration. Stents were successfully placed at target locations in all but one case with a long tortuous stricture, with 95.8% (23/24) technical success. One week after stent placement, mean gastricoutlet obstruction score improved significantly from baseline (1.74 ± 0.62 and 0.33 ± 0.48, respectively; P < 0.001). Stent migration, restenosis, and fracture occurred in four (17.4%), six (26.1%), and one (4.3%) of 23 stents, respectively. Median stent patency duration was 79 days. Mean stent patency was significantly longer in patients who received palliative chemotherapy than in those who did not (122.9 ± 11.0 and 38.3 ± 4.6, respectively; P < 0.001). UTE guidance SEMS delivery can be a feasible and safe rescue treatment method for malignant upper gastrointestinal obstruction in cases of failed attempts to place SEMS using conventional endoscopy. Our result warrants a further study to define the efficacy of this method in difficult SEMS placement cases. © 2013 The Authors. Digestive Endoscopy © 2013 Japan Gastroenterological Endoscopy Society.
Growth of Azotobacter vinelandii in a solid-state fermentation of technical lignin.
Zhang, Xiaoyong; Zhao, Hua; Zhang, Jianan; Li, Zuohu
2004-10-01
Azotobacter vinelandii was cultured on technical lignin, derived from Kraft pulping processes, for biofertilizer production in solid-state fermentation. The effects of the ratio of technical lignin to corn straw, initial water content, and material bed depth on the microorganisms were studied in detail. At 30 degrees C, technical lignin to corn straw at the ratio of 1:0.75, the bed depth of 5 cm, and 67% moisture content, A. vinelandii was grown and reached 4.2 x 10(10) cfu g(-1) dry rot after 36 h.
The function of report components in the screening and reading of technical reports
NASA Technical Reports Server (NTRS)
Pinelli, T. E.; Cordle, V. M.; Vondran, R. F.
1984-01-01
A reader preference survey of engineers and scientists at the NASA Langley Research Center and in three professional/technical societies was conducted to determine the opinions of report users and producers concerning the format (organization) of NASA technical reports and the usage of technical report components. The survey questionnaire contained fourteen questions covering twelve survey topics. This article reports the findings of two survey topics: the components initially reviewed or read to determine whether to read a report in its entirety and the order in which report components are read.
Properties of some statistics for AR-ARCH model with application to technical analysis
NASA Astrophysics Data System (ADS)
Huang, Xudong; Liu, Wei
2009-03-01
In this paper, we investigate some popular technical analysis indexes for AR-ARCH model as real stock market. Under the given conditions, we show that the corresponding statistics are asymptotically stationary and the law of large numbers hold for frequencies of the stock prices falling out normal scope of these technical analysis indexes under AR-ARCH, and give the rate of convergence in the case of nonstationary initial values, which give a mathematical rationale for these methods of technical analysis in supervising the security trends.
Assessment of advanced coal gasification processes
NASA Technical Reports Server (NTRS)
Mccarthy, J.; Ferrall, J.; Charng, T.; Houseman, J.
1981-01-01
A technical assessment of the following advanced coal gasification processes is presented: high throughput gasification (HTG) process; single stage high mass flux (HMF) processes; (CS/R) hydrogasification process; and the catalytic coal gasification (CCG) process. Each process is evaluated for its potential to produce synthetic natural gas from a bituminous coal. Key similarities, differences, strengths, weaknesses, and potential improvements to each process are identified. The HTG and the HMF gasifiers share similarities with respect to: short residence time (SRT), high throughput rate, slagging, and syngas as the initial raw product gas. The CS/R hydrogasifier is also SRT, but is nonslagging and produces a raw gas high in methane content. The CCG gasifier is a long residence time, catalytic, fluidbed reactor producing all of the raw product methane in the gasifier.
Brownfields and Land Revitalization Programmatic Information
This asset contains resources provided by EPA's Brownfields and Land Revitalization program that can be used for the assessment, cleanup, and redevelopment of brownfields sites and land revitalization activities. To help implement the program, EPA provides information on the Brownfields law, success stories from Brownfields grantees, technical information and resources to aid in the assessment and cleanup of brownfields properties, partnerships to promote the cleanup and reuse of Brownfields, and initiatives that explore sector-based solutions, enhance environmental quality, spur economic development, and revitalize communities. This asset includes fact sheets, success stories, training, policy, and guidance documents. Regulatory authority for the collection and use of this information is found in the Small Business Liability Relief and Brownfields Revitalization Act of 2002 (the Brownfields Law), which amended the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980.
SWIFT Differentiated Technical Assistance. White Paper
ERIC Educational Resources Information Center
McCart, Amy; McSheehan, Michael; Sailor, Wayne; Mitchiner, Melinda; Quirk, Carol
2016-01-01
The Schoolwide Integrated Framework for Transformation (SWIFT) employs six technical assistance (TA) practices that support an initial transformation process while simultaneously building system capacity to sustain and scale up equity-based inclusion in additional schools and districts over time. This paper explains these individual practices and…
Ceramic High Efficiency Particulate Air (HEPA) Filter Final Report CRADA No. TC02160.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mitchell, M.; Bergman, W.
2017-08-25
The technical objective of this project was to develop a ceramic HEPA filter technology, by initially producing and testing coupon ceramics, small scale prototypes, and full scale prototype HEPA filters, and to address relevant manufacturing and commercialization technical issues.
CALS Baseline Architecture Analysis of Weapons System. Technical Information: Army, Draft. Volume 8
DOT National Transportation Integrated Search
1989-09-01
This effort was performed to provide a common framework for analysis and planning of CALS initiatives across the military services, leading eventually to the development of a common DoD-wide architecture for CALS. This study addresses Army technical ...
Scientific and Technical Libraries in Kentucky.
ERIC Educational Resources Information Center
Powell, Russell H.; Gleim, David E.
Based on initial questionnaires, plus followup contacts and interviews, this survey documents for the first time the holdings, rates of growth, and information resources available at 72 of Kentucky's scientific and technical libraries. Included are library book collections that emphasize the business, economic, biological, physical, medical, and…
RAS Initiative - Community Outreach
Through community and technical collaborations, workshops and symposia, and the distribution of reference reagents, the RAS Initiative seeks to increase the sharing of knowledge and resources essential to defeating cancers caused by mutant RAS genes.
A comparison of a technical and a participatory application of social impact assessment.
Dennis R Becker; Charles C Harris; Erik A Nielsen; William J. McLaughlin
2004-01-01
Results of independent applications of a technical and a participatory approach to SIA are compared for an assessment of impacts of the proposed removal of hydroelectric dams to recover threatened and endangered salmon in the Pacific Northwest of the United States. The analysis focuses on empirical differences and similarities between the technical social analysis...
ERIC Educational Resources Information Center
DiLuzio, Geneva J.; And Others
This document accompanies Conceptual Learning and Development Assessment Series II: Cutting Tool, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data…
ERIC Educational Resources Information Center
DiLuzio, Geneva J.; And Others
This document accompanies the Conceptual Learning and Development Assessment Series III: Tree, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data for…
ERIC Educational Resources Information Center
DiLuzio, Geneva J.; And Others
This document accompanies the Conceptual Learning and Development Assessment Series I: Equilateral Triangle, a test constructed to chart the conceptual developemnt of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and…
ERIC Educational Resources Information Center
DiLuzio, Geneva J.; And Others
This document accompanies the Conceptual Learning and Development Assessment Series IV: Noun, a test constructed to chart the conceptual development of individuals. As a technical manual, it contains information on the rationale, development, standardization, and reliability of the test, as well as essential information and statistical data for…
Bouadma, Lila; Mourvillier, Bruno; Deiler, Véronique; Le Corre, Bertrand; Lolom, Isabelle; Régnier, Bernard; Wolff, Michel; Lucet, Jean-Christophe
2010-03-01
To determine the effect of a 2-yr multifaceted program aimed at preventing ventilator-acquired pneumonia on compliance with eight targeted preventive measures. Pre- and postintervention observational study. A 20-bed medical intensive care unit in a teaching hospital. A total of 1649 ventilator-days were observed. The program involved all healthcare workers and included a multidisciplinary task force, an educational session, direct observations with performance feedback, technical improvements, and reminders. It focused on eight targeted measures based on well-recognized published guidelines, easily and precisely defined acts, and directly concerned healthcare workers' bedside behavior. Compliance assessment consisted of five 4-wk periods (before the intervention and 1 month, 6 months, 12 months, and 24 months thereafter). Hand-hygiene and glove-and-gown use compliances were initially high (68% and 80%) and remained stable over time. Compliance with all other preventive measures was initially low and increased steadily over time (before 2-yr level, p < .0001): backrest elevation (5% to 58%) and tracheal cuff pressure maintenance (40% to 89%), which improved after simple technical equipment implementation; orogastric tube use (52% to 96%); gastric overdistension avoidance (20% to 68%); good oral hygiene (47% to 90%); and nonessential tracheal suction elimination (41% to 92%). To assess overall performance of the last six preventive measures, using ventilator-days as the unit of analysis, a composite score for preventive measures applied (range, 0-6) was developed. The median (interquartile range) composite scores for the five successive assessments were 2 (1-3), 4 (3-5), 4 (4-5), 5 (4-6), and 5 (4-6) points; they increased significantly over time (p < .0001). Ventilator-acquired pneumonia prevalence rate decreased by 51% after intervention (p < .0001). Our active, long-lasting program for preventing ventilator-acquired pneumonia successfully increased compliance with preventive measures directly dependent on healthcare workers' bedside performance. The multidimensional framework was critical for this marked, progressive, and sustained change.
REIMR: A Process for Utilizing Propulsion-Oriented 'Lessons-Learned' to Mitigate Development Risk
NASA Technical Reports Server (NTRS)
Ballard, Richard O.; Brown, Kendall K.
2005-01-01
This paper is a summary overview of a study conducted a t the NASA Marshall Space Flight Center (MSFC) during the initial phases of the Space Launch Initiative (SLI) program to evaluate a large number of technical problems associated with the design, development, test, evaluation and operation of several major liquid propellant rocket engine systems (i.e., SSME, Fastrac, J-2, F-1). The results of this study was the identification of the "Fundamental Root Causes" that enabled the technical problems to manifest, and practices that can be implemented to prevent them from recurring in future engine development efforts. This paper will discus the Fundamental Root Causes, cite some examples of how the technical problems arose from them, and provide a discussion of how they can be mitigated or avoided.
ISDP salt batch #2 supernate qualification
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peters, T. B.; Nash, C. A.; Fink, S. D.
2009-01-05
This report covers the laboratory testing and analyses of the second Integrated Salt Disposition Project (ISDP) salt supernate samples, performed in support of initial radioactive operations of Actinide Removal Process (ARP) and Modular Caustic-Side Solvent Extraction Unit (MCU). Major goals of this work include characterizing Tank 22H supernate, characterizing Tank 41H supernate, verifying actinide and strontium adsorption with a standard laboratory-scale test using monosodium titanate (MST) and filtration, and checking cesium mass transfer behavior for the MCU solvent performance when contacted with the liquid produced from MST contact. This study also includes characterization of a post-blend Tank 49H sample asmore » part of the Nuclear Criticality Safety Evaluation (NCSE). This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP). In addition, a sampling plan will be written to guide analytical future work. Safety and environmental aspects of the work were documented in a Hazard Assessment Package.« less
NASA Technical Reports Server (NTRS)
Fitz, Rhonda; Whitman, Gerek
2016-01-01
Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IVV) Program, with Software Assurance Research Program support, extracted FM architectures across the IVV portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IVV projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management.
More than a device: today's medical technology companies provide value through service.
McCoy, Fred
2003-01-01
When physicians implant cardiac rhythm management devices, they establish a long-term relationship with those devices and with the manufacturers of those devices. The therapeutic value that each device will provide to its patient is enhanced throughout the life of the device by the services that the manufacturer provides. Services are provided prior to, during and long after implantation. Services include physician and allied health professional training, quality assurance programs, therapy outreach initiatives, on site technical support during device implantation and follow-up, technical service expertise and customer service support. The costs of these services are substantial. When assessed on a per device basis, the service costs may actually exceed the costs of manufacture. Further, the costs of these services are rising. Over the past five years, the number of implanted cardiac rhythm management devices has doubled. Industry field forces have tripled in size. Clearly, industry is dedicated to providing service as a critical element in achieving excellent patient outcomes.
Scientific/Technical Report Bioenergetics Research Initiative Award number-DE-FG02-05ER64092
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trappe, Scott A
2009-12-04
General Project Overview and Final Technical Report This equipment grant was utilized to enhance the infrastructure of the Human Performance Laboratory at Ball State University. The laboratories primary focus is human based exercise physiology conducting research in the areas of sports performance, aging and exercise, unloading (space flight and bed rest), pediatric exercise and clinical exercise physiology. The main equipment supported by this grant was an ultrasound unit for cardiac and skeletal muscle imaging at the whole organ level, microscope system for micro imaging of skeletal muscle tissue, running treadmill for energy expenditure assessment, autoclave for sterilization, and upgrade tomore » our dual x–ray absorptiometry (DEXA) system that was utilized for body composition measurements. The equipment was involved in several human metabolic and skeletal muscle research projects as highlighted above. In particular, this equipment served a support role for other large–scale clinical projects funded by the National Institutes of Health (NIH), National Aeronautics and Space Administration (NASA), and corporate sponsors.« less
Small sample estimation of the reliability function for technical products
NASA Astrophysics Data System (ADS)
Lyamets, L. L.; Yakimenko, I. V.; Kanishchev, O. A.; Bliznyuk, O. A.
2017-12-01
It is demonstrated that, in the absence of big statistic samples obtained as a result of testing complex technical products for failure, statistic estimation of the reliability function of initial elements can be made by the moments method. A formal description of the moments method is given and its advantages in the analysis of small censored samples are discussed. A modified algorithm is proposed for the implementation of the moments method with the use of only the moments at which the failures of initial elements occur.
Electronic document distribution: Design of the anonymous FTP Langley Technical Report Server
NASA Technical Reports Server (NTRS)
Nelson, Michael L.; Gottlich, Gretchen L.
1994-01-01
An experimental electronic dissemination project, the Langley Technical Report Server (LTRS), has been undertaken to determine the feasibility of delivering Langley technical reports directly to the desktops of researchers worldwide. During the first six months, over 4700 accesses occurred and over 2400 technical reports were distributed. This usage indicates the high level of interest that researchers have in performing literature searches and retrieving technical reports at their desktops. The initial system was developed with existing resources and technology. The reports are stored as files on an inexpensive UNIX workstation and are accessible over the Internet. This project will serve as a foundation for ongoing projects at other NASA centers that will allow for greater access to NASA technical reports.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-13
...-01] Technical Inputs and Assessment Capacity on Topics Related to 2013 U.S. National Climate... Capacity Related to Regional, Sectoral, and Cross-Cutting Assessments for the 2013 U.S. National Climate... if applicable, institutional affiliation(s) if applicable). In addition, it is recommended that EOIs...
ERIC Educational Resources Information Center
Hansen, Mary A.; Lyon, Steven R.; Heh, Peter; Zigmond, Naomi
2013-01-01
Large-scale assessment programs, including alternate assessments based on alternate achievement standards (AA-AAS), must provide evidence of technical quality and validity. This study provides information about the technical quality of one AA-AAS by evaluating the standard setting for the science component. The assessment was designed to have…
U.S. Geological Survey Science for the Wyoming Landscape Conservation Initiative-2009 Annual Report
Bowen, Zachary H.; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Biewick, Laura R. H.; Blecker, Steven W.; Bristol, R. Sky; Carr, Natasha B.; Chalfoun, Anna D.; Chong, Geneva W.; Diffendorfer, James E.; Fedy, Bradley C.; Garman, Steven L.; Germaine, Stephen; Grauch, Richard I.; Holloway, JoAnn M.; Homer, Collin G.; Kauffman, Matthew J.; Keinath, Douglas; Latysh, Natalie; Manier, Daniel J.; McDougal, Robert R.; Melcher, Cynthia P.; Miller, Kirk A.; Montag, Jessica; Nutt, Constance J.; Potter, Christopher J.; Sawyer, Hall; Schell, Spencer; Shafer, Sarah L.; Smith, David B.; Stillings, Lisa L.; Tuttle, Michele L.W.; Wilson, Anna B.
2010-01-01
This is the second report produced by the U.S. Geological Survey (USGS) for the Wyoming Landscape Conservation Initiative (WLCI) to detail annual work activities. The first report described work activities for 2007 and 2008; this report covers work activities conducted in 2009. Important differences between the two reports are that (1) this report does not lump all the Effectiveness Monitoring activities together as last year's report did, which will allow WLCI partners and other readers to fully appreciate the scope and accomplishments of those activities, and (2) this report does not include a comprehensive appendix of the background details for each work activity. In 2009, there were 29 ongoing or completed activities, and there were 5 new work activities conducted under the 5 original major multi-disciplinary science and technical assistance activities: (1) Baseline Synthesis; (2) Targeted Monitoring and Research; (3) Data and Information Management; (4) Integration and Coordination; and (5) Decisionmaking and Evaluation. New work included (1) developing a soil-quality index, (2) developing methods for assessing levels of and relationships between mercury and soil organic matter, and (3) ascertaining element source, mobility, and fate. Additionally, (4) remotely sensed imagery was used to assess vegetation as an indicator of soil condition and geology, and (5) an Integrated Assessment (IA) was initiated to synthesize what has been learned about WLCI systems to date, and to develop associated decision tools, maps, and a comprehensive report.
Foster, J D; Miskovic, D; Allison, A S; Conti, J A; Ockrim, J; Cooper, E J; Hanna, G B; Francis, N K
2016-06-01
Laparoscopic rectal resection is technically challenging, with outcomes dependent upon technical performance. No robust objective assessment tool exists for laparoscopic rectal resection surgery. This study aimed to investigate the application of the objective clinical human reliability analysis (OCHRA) technique for assessing technical performance of laparoscopic rectal surgery and explore the validity and reliability of this technique. Laparoscopic rectal cancer resection operations were described in the format of a hierarchical task analysis. Potential technical errors were defined. The OCHRA technique was used to identify technical errors enacted in videos of twenty consecutive laparoscopic rectal cancer resection operations from a single site. The procedural task, spatial location, and circumstances of all identified errors were logged. Clinical validity was assessed through correlation with clinical outcomes; reliability was assessed by test-retest. A total of 335 execution errors identified, with a median 15 per operation. More errors were observed during pelvic tasks compared with abdominal tasks (p < 0.001). Within the pelvis, more errors were observed during dissection on the right side than the left (p = 0.03). Test-retest confirmed reliability (r = 0.97, p < 0.001). A significant correlation was observed between error frequency and mesorectal specimen quality (r s = 0.52, p = 0.02) and with blood loss (r s = 0.609, p = 0.004). OCHRA offers a valid and reliable method for evaluating technical performance of laparoscopic rectal surgery.
A study on technical efficiency of a DMU (review of literature)
NASA Astrophysics Data System (ADS)
Venkateswarlu, B.; Mahaboob, B.; Subbarami Reddy, C.; Sankar, J. Ravi
2017-11-01
In this research paper the concept of technical efficiency (due to Farell) [1] of a decision making unit (DMU) has been introduced and the measure of technical and cost efficiencies are derived. Timmer’s [2] deterministic approach to estimate the Cobb-Douglas production frontier has been proposed. The idea of extension of Timmer’s [2] method to any production frontier which is linear in parameters has been presented here. The estimation of parameters of Cobb-Douglas production frontier by linear programming approach has been discussed in this paper. Mark et al. [3] proposed a non-parametric method to assess efficiency. Nuti et al. [4] investigated the relationships among technical efficiency scores, weighted per capita cost and overall performance Gahe Zing Samuel Yank et al. [5] used Data envelopment analysis to assess technical assessment in banking sectors.
ERIC Educational Resources Information Center
Ucke, C.; Schlichting, H-J.
2009-01-01
Snap discs made of bimetal have many technical applications as thermostats. Jumping discs are a toy version of such snap discs. Besides giving technical information, we describe physical investigations. We show especially how, through simple measurements and calculations, you can determine the initial speed ([approximately equal to]3.5 m…
48 CFR 245.7002 - Duties and responsibilities of plant clearance officers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... clearance cases and disposal documents; (e) Initiate screening and provide technical support to screeners in...) Technical and quantitative allocability of property; (g) Ensure the timely shipment or release by the... are minimized and, when necessary, work with the contractor and property administrator to implement...
Advancing Next-Generation Energy in Indian Country (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
Advancing Energy Development in Indian Country (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This fact sheet provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
Enhancing Tribal Energy Security and Clean Energy (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This fact provides information on the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
Assessing Non-Technical Site Suitability Criteria for Stormwater Capture, Treatment and Recharge
NASA Astrophysics Data System (ADS)
Eisenstein, W.
2016-12-01
This presentation will describe a new method for assessing non-technical site suitability criteria for the siting of stormwater capture, treatment and recharge (or stormwater CTR) facilities in Sonoma County, California, USA. "Non-technical site suitability criteria" include issues such as community acceptance, aesthetics, nuisances and hazards, and compatibility with neighboring land uses, and are distinguished from "technical criteria" such as hydrology and soil characteristics that are the traditional subject of suitability analyses. Non-technical criteria are rarely, if ever, considered in formal siting suitability studies conducted by agencies and municipalities, yet can be fatal to the prospects of a given project's construction if not identified and mitigated. The researchers developed a new method for identifying and spatially characterizing relevant non-technical criteria through interviews and questionnaires with community stakeholders, and introducing those criteria into a spatial multi-criteria decision analysis framework that assesses site suitabilty across a study watershed (the Upper Petaluma River watershed in Sonoma County).
Deal, Shanley B; Lendvay, Thomas S; Haque, Mohamad I; Brand, Timothy; Comstock, Bryan; Warren, Justin; Alseidi, Adnan
2016-02-01
Objective, unbiased assessment of surgical skills remains a challenge in surgical education. We sought to evaluate the feasibility and reliability of Crowd-Sourced Assessment of Technical Skills. Seven volunteer general surgery interns were given time for training and then testing, on laparoscopic peg transfer, precision cutting, and intracorporeal knot-tying. Six faculty experts (FEs) and 203 Amazon.com Mechanical Turk crowd workers (CWs) evaluated 21 deidentified video clips using the Global Objective Assessment of Laparoscopic Skills validated rating instrument. Within 19 hours and 15 minutes we received 662 eligible ratings from 203 CWs and 126 ratings from 6 FEs over 10 days. FE video ratings were of borderline internal consistency (Krippendorff's alpha = .55). FE ratings were highly correlated with CW ratings (Pearson's correlation coefficient = .78, P < .001). We propose the use of Crowd-Sourced Assessment of Technical Skills as a reliable, basic tool to standardize the evaluation of technical skills in general surgery. Copyright © 2016 Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Garcia, Roberto; Saulsberry, Regor L.
2011-01-01
NASA's Technical Fellow for Propulsion, requested a technical assessment of the performance improvement achieved by the introduction of the stainless steel (SS) V-channel compared to the aluminum (Al) Y-channel Primer Chamber Assembly (PCA) design. The SS V-channel PCA was developed for NASA's Mars Science Laboratory (MSL) Project. The principle focus of the assessment was to measure the transient temperature at the booster interface with both designs. This document contains the findings of the assessment.
A socio-technical model to explore urban water systems scenarios.
de Haan, Fjalar J; Ferguson, Briony C; Deletic, Ana; Brown, Rebekah R
2013-01-01
This article reports on the ongoing work and research involved in the development of a socio-technical model of urban water systems. Socio-technical means the model is not so much concerned with the technical or biophysical aspects of urban water systems, but rather with the social and institutional implications of the urban water infrastructure and vice versa. A socio-technical model, in the view purported in this article, produces scenarios of different urban water servicing solutions gaining or losing influence in meeting water-related societal needs, like potable water, drainage, environmental health and amenity. The urban water system is parameterised with vectors of the relative influence of each servicing solution. The model is a software implementation of the Multi-Pattern Approach, a theory on societal systems, like urban water systems, and how these develop and go through transitions under various internal and external conditions. Acknowledging that social dynamics comes with severe and non-reducible uncertainties, the model is set up to be exploratory, meaning that for any initial condition several possible future scenarios are produced. This article gives a concise overview of the necessary theoretical background, the model architecture and some initial test results using a drainage example.
First International Symposium on Strain Gauge Balances. Pt. 1
NASA Technical Reports Server (NTRS)
Tripp, John S. (Editor); Tcheng, Ping (Editor)
1999-01-01
The first International Symposium on Strain Gauge Balances was sponsored and held at NASA Langley Research Center during October 22-25, 1996. The symposium provided an open international forum for presentation, discussion, and exchange of technical information among wind tunnel test technique specialists and strain gauge balance designers. The Symposium also served to initiate organized professional activities among the participating and relevant international technical communities. Over 130 delegates from 15 countries were in attendance. The program opened with a panel discussion, followed by technical paper sessions, and guided tours of the National Transonic Facility (NTF) wind tunnel, a local commercial balance fabrication facility, and the LaRC balance calibration laboratory. The opening panel discussion addressed "Future Trends in Balance Development and Applications." Forty-six technical papers were presented in 11 technical sessions covering the following areas: calibration, automatic calibration, data reduction, facility reports, design, accuracy and uncertainty analysis, strain gauges, instrumentation, balance design, thermal effects, finite element analysis, applications, and special balances. At the conclusion of the Symposium, a steering committee representing most of the nations and several U.S. organizations attending the Symposium was established to initiate planning for a second international balance symposium, to be held in 1999 in the UK.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gonzalez, R.R.; McLellan, T.M.; Withey, W.R.
This report represents the results of TTCP-UTP6 efforts on modeling aspects when chemical protective ensembles are worn which need to be considered in warm environments. Since 1983, a significant data base has been collected using human experimental studies and wide clothing systems from which predictive modeling equations have been developed with individuals working in temperate and hot environments, but few comparisons of the -- results from various model outputs have ever been carried out. This initial comparison study was part of a key technical area (KIA) project for The Technical Cooperation Program (TTCP) UTP-6 working party. A modeling workshop wasmore » conducted in Toronto, Canada on 9-10 June 1994 to discuss the data reduction and results acquired in an initial clothing analysis study of TTCP using various chemical protective garments. To our knowledge, no comprehensive study to date has ever focused on comparing experimental results using an international standardized heat stress procedure matched to physiological outputs from various model predictions in individuals dressed in chemical protective clothing systems. This is the major focus of this TTCP key technical study. This technical report covers one aspect of the working party`s results.« less
First International Symposium on Strain Gauge Balances. Part 2
NASA Technical Reports Server (NTRS)
Tripp, John S (Editor); Tcheng, Ping (Editor)
1999-01-01
The first International Symposium on Strain Gauge Balances was sponsored and held at NASA Langley Research Center during October 22-25, 1996. The symposium provided an open international forum for presentation, discussion, and exchange of technical information among wind tunnel test technique specialists and strain gauge balance designers. The Symposium also served to initiate organized professional activities among the participating and relevant international technical communities. Over 130 delegates from 15 countries were in attendance. The program opened with a panel discussion, followed by technical paper sessions, and guided tours of the National Transonic Facility (NTF) wind tunnel, a local commercial balance fabrication facility, and the LaRC balance calibration laboratory. The opening panel discussion addressed "Future Trends in Balance Development and Applications." Forty-six technical papers were presented in 11 technical sessions covering the following areas: calibration, automatic calibration, data reduction, facility reports, design, accuracy and uncertainty analysis, strain gauges, instrumentation, balance design, thermal effects, finite element analysis, applications, and special balances. At the conclusion of the Symposium, a steering committee representing most of the nations and several U.S. organizations attending the Symposium was established to initiate planning for a second international balance symposium, to be held in 1999 in the UK.
Initiating Event Analysis of a Lithium Fluoride Thorium Reactor
NASA Astrophysics Data System (ADS)
Geraci, Nicholas Charles
The primary purpose of this study is to perform an Initiating Event Analysis for a Lithium Fluoride Thorium Reactor (LFTR) as the first step of a Probabilistic Safety Assessment (PSA). The major objective of the research is to compile a list of key initiating events capable of resulting in failure of safety systems and release of radioactive material from the LFTR. Due to the complex interactions between engineering design, component reliability and human reliability, probabilistic safety assessments are most useful when the scope is limited to a single reactor plant. Thus, this thesis will study the LFTR design proposed by Flibe Energy. An October 2015 Electric Power Research Institute report on the Flibe Energy LFTR asked "what-if?" questions of subject matter experts and compiled a list of key hazards with the most significant consequences to the safety or integrity of the LFTR. The potential exists for unforeseen hazards to pose additional risk for the LFTR, but the scope of this thesis is limited to evaluation of those key hazards already identified by Flibe Energy. These key hazards are the starting point for the Initiating Event Analysis performed in this thesis. Engineering evaluation and technical study of the plant using a literature review and comparison to reference technology revealed four hazards with high potential to cause reactor core damage. To determine the initiating events resulting in realization of these four hazards, reference was made to previous PSAs and existing NRC and EPRI initiating event lists. Finally, fault tree and event tree analyses were conducted, completing the logical classification of initiating events. Results are qualitative as opposed to quantitative due to the early stages of system design descriptions and lack of operating experience or data for the LFTR. In summary, this thesis analyzes initiating events using previous research and inductive and deductive reasoning through traditional risk management techniques to arrive at a list of key initiating events that can be used to address vulnerabilities during the design phases of LFTR development.
Setting Performance Standards for Technical and Nontechnical Competence in General Surgery.
Szasz, Peter; Bonrath, Esther M; Louridas, Marisa; Fecso, Andras B; Howe, Brett; Fehr, Adam; Ott, Michael; Mack, Lloyd A; Harris, Kenneth A; Grantcharov, Teodor P
2017-07-01
The objectives of this study were to (1) create a technical and nontechnical performance standard for the laparoscopic cholecystectomy, (2) assess the classification accuracy and (3) credibility of these standards, (4) determine a trainees' ability to meet both standards concurrently, and (5) delineate factors that predict standard acquisition. Scores on performance assessments are difficult to interpret in the absence of established standards. Trained raters observed General Surgery residents performing laparoscopic cholecystectomies using the Objective Structured Assessment of Technical Skill (OSATS) and the Objective Structured Assessment of Non-Technical Skills (OSANTS) instruments, while as also providing a global competent/noncompetent decision for each performance. The global decision was used to divide the trainees into 2 contrasting groups and the OSATS or OSANTS scores were graphed per group to determine the performance standard. Parametric statistics were used to determine classification accuracy and concurrent standard acquisition, receiver operator characteristic (ROC) curves were used to delineate predictive factors. Thirty-six trainees were observed 101 times. The technical standard was an OSATS of 21.04/35.00 and the nontechnical standard an OSANTS of 22.49/35.00. Applying these standards, competent/noncompetent trainees could be discriminated in 94% of technical and 95% of nontechnical performances (P < 0.001). A 21% discordance between technically and nontechnically competent trainees was identified (P < 0.001). ROC analysis demonstrated case experience and trainee level were both able to predict achieving the standards with an area under the curve (AUC) between 0.83 and 0.96 (P < 0.001). The present study presents defensible standards for technical and nontechnical performance. Such standards are imperative to implementing summative assessments into surgical training.
Multidisciplinary team simulation for the operating theatre: a review of the literature.
Tan, Shaw Boon; Pena, Guilherme; Altree, Meryl; Maddern, Guy J
2014-01-01
Analyses of adverse events inside the operating theatre has demonstrated that many errors are caused by failure in non-technical skills and teamwork. While simulation has been used successfully for teaching and improving technical skills, more recently, multidisciplinary simulation has been used for training team skills. We hypothesized that this type of training is feasible and improves team skills in the operating theatre. A systematic search of the literature for studies describing true multidisciplinary operating theatre team simulation was conducted in November and December 2012. We looked at the characteristics and outcomes of the team simulation programmes. 1636 articles were initially retrieved. Utilizing a stepwise evaluation process, 26 articles were included in the review. The studies reveal that multidisciplinary operating theatre simulation has been used to provide training in technical and non-technical skills, to help implement new techniques and technologies, and to identify latent weaknesses within a health system. Most of the studies included are descriptions of training programmes with a low level of evidence. No randomized control trial was identified. Participants' reactions to the training programme were positive in all studies; however, none of them could objectively demonstrate that skills acquired from simulation are transferred to the operating theatre or show a demonstrable benefit in patient outcomes. Multidisciplinary operating room team simulation is feasible and widely accepted by participants. More studies are required to assess the impact of this type of training on operative performance and patient safety. © 2013 Royal Australasian College of Surgeons.
VISIONS2 Learning for Life Initiative. Final Report.
ERIC Educational Resources Information Center
Orangeburg-Calhoun Technical Coll., Orangeburg, SC.
During the Learning for Life Initiative, a technical college and an adult education center partnered with two area businesses to develop and deliver job-specific workplace literacy and basic skills training to employees. Major activities of the initiative included the following: comprehensive staff development program for all project instructors,…
On December 9, 2013, EPA reconvened the study’s Technical Roundtable. Subject-matter experts discussed the outcomes of the 2013 Technical Workshops, stakeholder engagement, and plans for draft assessment report.
42 CFR 493.1413 - Standard; Technical consultant responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... consultant responsibilities. The technical consultant is responsible for the technical and scientific... of performance of instrument maintenance and function checks; (v) Assessment of test performance...
42 CFR 493.1413 - Standard; Technical consultant responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... consultant responsibilities. The technical consultant is responsible for the technical and scientific... of performance of instrument maintenance and function checks; (v) Assessment of test performance...
National Institute of Neurological Disorders and Stroke
... All News Technical Assistance Webinar for the BRAIN Initiative Diversity K99/R00 Tuesday, June 12, 2018 | Online ... View All Events Director's Corner The NIH HEAL Initiative and Pain Research Thursday, June 21, 2018 At ...
The rideability of a deflected bridge approach slab : technical summary report 457.
DOT National Transportation Integrated Search
2009-11-01
The Louisiana Department of Transportation and Development (LADOTD) initiated the Louisiana Quality : Initiative (LQI) entitled Preservation of Bridge Approach Rideability to explore different potential : methods of solving what has been observ...
Using Corporate-Based Methods To Assess Technical Communication Programs.
ERIC Educational Resources Information Center
Faber, Brenton; Bekins, Linn; Karis, Bill
2002-01-01
Investigates methods of program assessment used by corporate learning sites and profiles value added methods as a way to both construct and evaluate academic programs in technical communication. Examines and critiques assessment methods from corporate training environments including methods employed by corporate universities and value added…
HAMAMOTO, Kohei; MATSUURA, Katsuhiko; CHIBA, Emiko; OKOCHI, Tomohisa; TANNO, Keisuke; TANAKA, Osamu
2016-01-01
Purpose: The purpose of this study was to evaluate the diagnostic performance of non-contrast-enhanced magnetic resonance angiography with time-spatial labeling inversion pulse (time-SLIP MRA) in the assessment of pulmonary arteriovenous malformation (PAVM). Methods: Eleven consecutive patients with 38 documented PAVMs underwent time-SLIP MRA with a 3-tesla unit. Eight patients with 25 lesions were examined twice, once before and once after embolotherapy. The lesions were divided into two groups—initial diagnosis (n = 35) and follow-up (n = 28)—corresponding to untreated and treated lesions, respectively, and were evaluated separately. To evaluate the initial diagnosis group, two reviewers assessed image quality for visualization of PAVMs by using a qualitative 4-point scale (1 = not assessable to 4 = excellent). The location and classification of PAVMs were also evaluated. The results were compared with those from digital subtraction angiography. For evaluation of the follow-up group, the reviewers assessed the status of treated PAVMs. Reperfusion and occlusion were defined respectively as visualization or disappearance of the aneurysmal sac. The diagnostic accuracy of time-SLIP MRA was assessed and compared with standard reference images. Interobserver agreement was evaluated with the κ statistic. Results: In the initial diagnosis group, time-SLIP MRA correctly determined the PAVMs in all but one patient with one lesion who had image degradation due to irregular breath. Image quality was considered excellent (median = 4) and the κ coefficient was 0.85. Additionally, both readers could correctly localize and classify the PAVMs on time-SLIP MRA images with both κ coefficient of 1.00. In the follow-up group, the sensitivity and specificity of time-SLIP MRA for reperfusion of PAVMs were both 100%, and the κ coefficient was 1.00. Conclusion: Time-SLIP MRA is technically and clinically feasible and represents a promising technique for noninvasive pre- and post-treatment assessment of PAVMs. PMID:26841853
Trimble, Gillian; McStravick, Clodagh; Farling, Peter; Megaw, Katie; McKinstry, Steven; Smyth, Graham; Law, Gillian; Courtney, Heather; Quigley, Gavin; Flannery, Thomas
2015-01-01
Although variations in the technique of awake craniotomy (AC) have been widely reported, a key member of this interdisciplinary procedure is the healthcare professional performing assessments of neurological function during resection. The expertise of the latter will depend on the neurological function to be tested and on available resources of the institution. This report details our initial experience of an AC service utilizing the expertise of a speech and language therapist (SLT) and an experienced neuro-physiotherapist (NP) to monitor patient function during glioma resection. Forty-five patients underwent 50 AC procedures for eloquently located gliomas over a 3-year period. Patients with a glioma involving speech or sensorimotor areas were assessed preoperatively by the SLT/NP respectively. The same therapist monitored the patient's neurological function intraoperatively and executed a rehabilitation program tailored to the needs of the patient in the postoperative period. Three patients underwent biopsy only, due to intraoperative seizures precluding intraoperative mapping (2 cases) or speech arrest on stimulation of a small recurrent tumor. The remaining 47 cases were suitable for repetitive neurological assessment "awake" during tumor debulking. One patient with a large sensorimotor tumor developed intraoperative hemiparesis due to outward brain herniation (which recovered postoperatively). Ten patients developed a new or worsened neurological deficit in the initial postoperative period (6 were detected intraoperatively), of which 5 eventually had resolution and returned to baseline function within 2 weeks. In our initial experience based anecdotally on a previous similar "non-awake" caseload, we have found AC with the input of the SLT/NP to be a key component in ensuring optimal functional outcomes for patients with gliomas in eloquently located areas.
Purpose and Need for a Grassland Assessment
Deborah M. Finch; Cathy W. Dahms
2004-01-01
This report is volume 1 of an ecological assessment of grassland ecosystems in the Southwestern United States, and it is one of a series of planned publications addressing major ecosystems of the Southwest. The first assessment, General Technical Report RM-GTR- 295, An Assessment of Forest Ecosystem Health in the Southwest (by Dahms and Geils, technical editors,...
MR-guided microwave ablation in hepatic tumours: initial results in clinical routine.
Hoffmann, Rüdiger; Rempp, Hansjörg; Keßler, David-Emanuel; Weiß, Jakob; Pereira, Philippe L; Nikolaou, Konstantin; Clasen, Stephan
2017-04-01
Evaluation of the technical success, patient safety and technical effectiveness of magnetic resonance (MR)-guided microwave ablation of hepatic malignancies. Institutional review board approval and informed patient consent were obtained. Fifteen patients (59.8 years ± 9.5) with 18 hepatic malignancies (7 hepatocellular carcinomas, 11 metastases) underwent MR-guided microwave ablation using a 1.5-T MR system. Mean tumour size was 15.4 mm ± 7.7 (7-37 mm). Technical success and ablation zone diameters were assessed by post-ablative MR imaging. Technique effectiveness was assessed after 1 month. Complications were classified according to the Common Terminology Criteria for Adverse Events (CTCAE). Mean follow-up was 5.8 months ± 2.6 (1-10 months). Technical success and technique effectiveness were achieved in all lesions. Lesions were treated using 2.5 ± 1.2 applicator positions. Mean energy and ablation duration per tumour were 37.6 kJ ± 21.7 (9-87 kJ) and 24.7 min ± 11.1 (7-49 min), respectively. Coagulation zone short- and long-axis diameters were 31.5 mm ± 10.5 (16-65 mm) and 52.7 mm ± 15.4 (27-94 mm), respectively. Two CTCAE-2-complications occurred (pneumothorax, pleural effusion). Seven patients developed new tumour manifestations in the untreated liver. Local tumour progression was not observed. Microwave ablation is feasible under near real-time MR guidance and provides effective treatment of hepatic malignancies in one session. • Planning, applicator placement and therapy monitoring are possible without using contrast enhancement • Energy transmission from the generator to the scanner room is safely possible • MR-guided microwave ablation provides effective treatment of hepatic malignancies in one session • Therapy monitoring is possible without applicator retraction from the ablation site.
Willems, Joost I P; Shin, Alexandra M; Shin, Delaney M; Bishop, Allen T; Shin, Alexander Y
2016-04-01
Microsurgery can be challenging secondary to orientation of the vessels, accessibility, or depth of the wound. Robotically assisted microsurgery reduces tremors and improves visualization and may improve the quality of anastomosis compared with traditional microsurgery. The purpose of this study was to compare robotically assisted microsurgery to traditional microsurgery in technically challenging situations with respect to time of anastomosis, quality of anastomosis, and Objective Structured Assessment of Technical Skills. Two investigators with no prior surgery or microsurgery experience performed 160 anastomoses on artificial microvessels after undergoing standardized traditional and robotically assisted microsurgery courses. Five different exposure groups were created with depths of 0, 10, and 20 cm and sidewall angles of 20 and 30 degrees. A comparison of 80 manual with 80 robotically assisted microsurgery anastomoses in different exposure groups was undertaken. The modified Objective Structured Assessment of Technical Skills scoring system, duration per anastomosis, and a subjective comfort scale were evaluated. In the most difficult exposure, Objective Structured Assessment of Technical Skills scores were similar in both groups (p = 0.98), the duration was higher in the manual group (p = 0.004), and the subjective comfort rating was higher in the robotically assisted microsurgery group (p < 0.001). In the easiest (0-cm depth, flat) exposure, Objective Structured Assessment of Technical Skills scores were higher in the manual group (p = 0.018) and the duration was longer in the robotically assisted microsurgery group (p = 0.008). Manual surgery was superior to robotically assisted microsurgery in technically easy exposures. In difficult exposures (greater depth and lower sidewall angles), however, robotically assisted microsurgery had a shorter surgery time and a higher comfort rating, with Objective Structured Assessment of Technical Skills scores similar to those assessing traditional microsurgery. Therapeutic, V.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in engineering and industrial fields. A…
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in agriculture and related businesses. A…
Health Related Occupations. Revised Summary Report: Technical Employment in Northeast Florida.
ERIC Educational Resources Information Center
Baker, William E.; And Others
The document is one of five summary reports, all part of a Pre-Technical Curriculum Planning Project for secondary students who aspire to technical employment or post secondary technical education. This report represents the results of an assessment of the northeast Florida area's technical occupations in health related occupations. A three-phase…
Science and Engineering Technical Assessments (SETA) Program
NASA Technical Reports Server (NTRS)
Huy, Frank
2000-01-01
This document provides a project plan for the D.N. American response to Modification #1 to Contract Task Order #13 - Program Maintenance and Logistics for the Science and Engineering Technical Assessments (SETA) contract.
Outdoor Leadership Evaluation: Nature and Scope of the Problem.
ERIC Educational Resources Information Center
James, Leroy M.
Beyond the ability to exhibit good judgment and common sense while performing duties as a leader under stress and pressure, an outdoor adventure program leader should possess technical skills, human relations skills, and philosophical understanding of outdoor programming. Technical skills include knowledge of initiatives/ropes course activities,…
Critical Pedagogy for Vocational Education: The Practice with Novice Professionals.
ERIC Educational Resources Information Center
Askins, K. Brent; Galloy, Michael J.
The Georgia Instructor Academy (GIA) initiative is intended to provide staff development activities that enhance the quality of instruction delivered at the technical institutes. Before GIA could become functional, the following significant changes in the state's postsecondary technical education system had to occur: (1) creation of the Georgia…
State Technical Assistance Initiatives for IDEA Part B Programs.
ERIC Educational Resources Information Center
Hanft, Barbara
This report discusses a study that examined state technical assistance (TA) infrastructures that support research-based practices for improved outcomes for students with disabilities served under Part B of the Individuals with Disabilities Education Act. The 10 participating states included: Alabama, Colorado, Iowa, Maryland, Montana, Oklahoma,…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-10
...: Pretrial Technical Assistance for Evidence-Based Decision Making in Local Criminal Justice Systems AGENCY... NIC initiative, Evidence-Based Decision Making (EBDM) in Local Criminal Justice Systems. Work under... individual system planning activities. These change strategies are critical to meeting their system's harm...
The Effect of Digital Publishing on Technical Services in University Libraries
ERIC Educational Resources Information Center
Hunter, Ben
2013-01-01
The past decade has brought enormous changes in scholarly communication, leading many libraries to undertake large-scale digital publishing initiatives. However, no study has investigated how technical services departments are changing to support these new services. Using change management as a theoretical framework, the investigator uses content…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-14
... Support Post Earthquake Reconstruction, Cholera and HIV/AIDS Response, FOA GH12-001, and Research and Technical Assistance for Public Health Laboratories in Haiti to Support Post Earthquake Reconstruction... and Technical Assistance for Public Health Interventions in Haiti to Support Post Earthquake...
Penny, S; Murray, S F
2000-12-01
Increased international awareness of the need to provide accessible essential or emergency obstetric and newborn care in developing countries has resulted in the recognition of new training needs and in a number of new initiatives to meet those needs. This paper reviews experience in this area so far. The first section deals with some of the different educational approaches and teaching methods that have now been employed, ranging from the traditional untheorized 'chalk and talk', to competency-based training, to theories of adult learning, problem solving and transferable skills. The second section describes a range of different types of indicators and data sources (learner assessments, user and community assessments, trainer assessments and institutional data) that have been used in the assessment of the effectiveness of such training. The final section of the paper draws together some of the lessons. It considers evaluation design issues such as the inclusion of medium and long term evaluation, the importance of methods that allow for the detection of iatrogenic effects of training, and the roles of community randomized trials and 'before, during and after' studies. Issues identified for the future include comparative work, how to keep training affordable, and where training ought to lie on the continuum between straightforward technical skills acquisition and the more complex learning processes required for demanding professional work.
Regional Integrated Assessments in Support of Decision-making: Process, Product, and Policy
NASA Astrophysics Data System (ADS)
Luers, A. L.; Hayhoe, K.
2006-12-01
Regional integrated climate assessments are increasingly viewed as critical for informing sound climate policy. Yet, the scientific information in many assessments often is not effectively transformed in to policies to protect the environment. Why are some assessments more effective at informing policies than others? We will provide some insight into this question by describing the lessons learned from a series of regional assessments organized by the Union of Concerned Scientists (UCS). Working with independent experts in the global change research community, UCS has produced assessments in three regions of the US California, the Great Lakes, and the Gulf Coast. The reports from each of these assessments continue to be used by local, state and regional decision-makers in related management and policy initiatives. We attribute the success of these assessments in motivating and supporting climate-related decisions to four factors: (1) credibility, attained both through scientific peer-review and by engaging local scientific and community leaders; (2) regional relevance of assessment focus areas; (3) accessible presentation of the results to non-technical audiences; and (4) wide communication and distribution of the report to the media, the public, civic groups, and public officials.
Tanks Focus Area site needs assessment FY 1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This report documents the process used by the Tanks Focus Area (TFA) to analyze and develop responses to technology needs submitted by four major US Department of Energy (DOE) sites with radioactive tank waste problems, and the initial results of the analysis. The sites are the Hanford Site, Idaho National Engineering and Environmental Laboratory (INEEL), Oak Ridge Reservation (ORR), and Savannah River Site (SRS). This document describes the TFA`s process of collecting site needs, analyzing them, and creating technical responses to the sites. It also summarizes the information contained within the TFA needs database, portraying information provided by four majormore » DOE sites with tank waste problems. The overall TFA program objective is to deliver a tank technology program that reduces the current cost, and the operational and safety risks of tank remediation. The TFA`s continues to enjoy close, cooperative relationships with each site. During the past year, the TFA has fostered exchanges of technical information between sites. These exchanges have proven to be healthy for all concerned. The TFA recognizes that site technology needs often change, and the TFA must be prepared not only to amend its program in response, but to help the sites arrive at the best technical approach to solve revised site needs.« less
Olson, Jonathan R; McCarthy, Kimberly J; Perkins, Daniel F; Borden, Lynne M
2018-04-01
The Children, Youth, and Families At-Risk (CYFAR) initiative provides funding and technical support for local community-based programs designed to promote positive outcomes among vulnerable populations. In 2013, CYFAR implemented significant changes in the way it provides technical assistance (TA) to grantees. These changes included introducing a new TA model in which trained coaches provide proactive support that is tailored to individual CYFAR projects. The purpose of this paper is to describe the evolution of this TA model and present preliminary findings from a formative evaluation. CYFAR Principal Investigators (PIs) were invited to respond to online surveys in 2015 and 2016. The surveys were designed to assess PI attitudes towards the nature and quality of support that they receive from their coaches. CYFAR PIs reported that their coaches have incorporated a range of coaching skills and techniques into their work. PIs have generally positive attitudes towards their coaches, and these attitudes have become more positive over time. Results suggest that CYFAR PIs have been generally supportive of the new TA system. Factors that may have facilitated support include a strong emphasis on team-building and the provision of specific resources that support program design, implementation, and evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.
Pavell, Anthony; Hughes, Keith A
2010-01-01
This article describes a method for achieving the load equivalence model, described in Parenteral Drug Association Technical Report 1, using a mass-based approach. The item and load bracketing approach allows for mixed equipment load size variation for operational flexibility along with decreased time to introduce new items to the operation. The article discusses the utilization of approximately 67 items/components (Table IV) identified for routine sterilization with varying quantities required weekly. The items were assessed for worst-case identification using four temperature-related criteria. The criteria were used to provide a data-based identification of worst-case items, and/or item equivalence, to carry forward into cycle validation using a variable load pattern. The mass approach to maximum load determination was used to bracket routine production use and allows for variable loading patterns. The result of the item mapping and load bracketing data is "a proven acceptable range" of sterilizing conditions including loading configuration and location. The application of these approaches, while initially more time/test-intensive than alternate approaches, provides a method of cycle validation with long-term benefit of ease of ongoing qualification, minimizing time and requirements for new equipment qualification for similar loads/use, and for rapid and rigorous assessment of new items for sterilization.
Three multimedia models used at hazardous and radioactive waste sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moskowitz, P.D.; Pardi, R.; Fthenakis, V.M.
1996-02-01
Multimedia models are used commonly in the initial phases of the remediation process where technical interest is focused on determining the relative importance of various exposure pathways. This report provides an approach for evaluating and critically reviewing the capabilities of multimedia models. This study focused on three specific models MEPAS Version 3.0, MMSOILS Version 2.2, and PRESTO-EPA-CPG Version 2.0. These models evaluate the transport and fate of contaminants from source to receptor through more than a single pathway. The presence of radioactive and mixed wastes at a site poses special problems. Hence, in this report, restrictions associated with the selectionmore » and application of multimedia models for sites contaminated with radioactive and mixed wastes are highlighted. This report begins with a brief introduction to the concept of multimedia modeling, followed by an overview of the three models. The remaining chapters present more technical discussions of the issues associated with each compartment and their direct application to the specific models. In these analyses, the following components are discussed: source term; air transport; ground water transport; overland flow, runoff, and surface water transport; food chain modeling; exposure assessment; dosimetry/risk assessment; uncertainty; default parameters. The report concludes with a description of evolving updates to the model; these descriptions were provided by the model developers.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Milne, T.A.
1986-09-01
This glossary is a compendium of terms frequently encountered by those interested or involved in the use of biomass for energy purposes. As this is a newly developing technology crossing many disciplines, there is a special need for definitions, including the definition of biomass itself. The initial basis of the present glossary was a collection of terms prepared for the Bioenergy Program of the National Research Council of Canada. To this list were added many terms from existing published glossaries and lists of definitions in published government reports. This preliminary collection of terms was submitted to a number of reviewersmore » for initial screening and assessment. The reviewers' and the Solar Energy Research Institute's consensus was that many extant definitions needed to be reformulated or were actually technically incorrect. Furthermore, it became apparent that many different opinions exist as to the proper thrust of definitions. 32 refs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1982-01-01
Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references ofmore » Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hillesheim, M.; Mosey, G.
2013-11-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Lakeview Uranium Mill site in Lakeview, Oregon, for a feasibility study of renewable energy production. The EPA contracted with the National Renewable Energy Laboratory (NREL) to provide technical assistance for the project. The purpose of this report is to describe an assessment of the site for possible development of a geothermal power generation facility and to estimate the cost, performance, and site impacts for the facility. In addition, the report recommends development pathways that could assist in the implementation of a geothermal power systemmore » at the site.« less
Realizing "2001: A Space Odyssey": Piloted Spherical Torus Nuclear Fusion Propulsion
NASA Technical Reports Server (NTRS)
Williams, Craig H.; Dudzinski, Leonard A.; Borowski, Stanley K.; Juhasz, Albert J.
2005-01-01
A conceptual vehicle design enabling fast, piloted outer solar system travel was created predicated on a small aspect ratio spherical torus nuclear fusion reactor. The initial requirements were satisfied by the vehicle concept, which could deliver a 172 mt crew payload from Earth to Jupiter rendezvous in 118 days, with an initial mass in low Earth orbit of 1,690 mt. Engineering conceptual design, analysis, and assessment was performed on all major systems including artificial gravity payload, central truss, nuclear fusion reactor, power conversion, magnetic nozzle, fast wave plasma heating, tankage, fuel pellet injector, startup/re-start fission reactor and battery bank, refrigeration, reaction control, communications, mission design, and space operations. Detailed fusion reactor design included analysis of plasma characteristics, power balance/utilization, first wall, toroidal field coils, heat transfer, and neutron/x-ray radiation. Technical comparisons are made between the vehicle concept and the interplanetary spacecraft depicted in the motion picture 2001: A Space Odyssey.
NASA Technical Reports Server (NTRS)
Matolak, David W.
2017-01-01
NASA's Aeronautics Research Mission Directorate (ARMD) has recently solicited proposals and awarded funds for research and development to achieve and exceed the goals envisioned in the ARMD Strategic Implementation Plan (SIP). The Hyper-Spectral Communications and Networking for Air Traffic Management (ATM) (HSCNA) project is the only University Leadership Initiative (ULI) program to address communications and networking (and to a degree, navigation and surveillance). This paper will provide an overview of the HSCNA project, and specifically describe two of the project's technical challenges: comprehensive aviation communications and networking assessment, and proposed multi-band and multimode communications and networking. The primary goals will be described, as will be research and development aimed to achieve and exceed these goals. Some example initial results are also provided.
Jirativanont, T; Raksamani, K; Aroonpruksakul, N; Apidechakul, P; Suraseranivongse, S
2017-07-01
We sought to evaluate the validity of two non-technical skills evaluation instruments, the Anaesthetists' Non-Technical Skills (ANTS) behavioural marker system and the Ottawa Global Rating Scale (GRS), to apply them to anaesthesia training. The content validity, response process, internal structure, relations with other variables and consequences were described for validity evidence. Simulated crisis management sessions were initiated during which two trained raters evaluated the performance of postgraduate first-, second- and third-year (PGY-1, PGY-2 and PGY-3) anaesthesia residents. The study included 70 participants, composed of 24 PGY-1, 24 PGY-2 and 22 PGY-3 residents. Both instruments differentiated the non-technical skills of PGY-1 from PGY-3 residents ( P <0.05). Inter-rater agreement was measured using the intraclass correlation coefficient (ICC). For the ANTS instrument, the intraclass correlation coefficients for task management, team-working, situation awareness and decision-making were 0.79, 0.34, 0.81 and 0.70, respectively. For the Ottawa GRS, the intraclass correlation coefficients for overall performance, leadership, problem-solving, situation awareness, resource utilisation and communication skills were 0.86, 0.83, 0.84, 0.87, 0.80 and 0.86, respectively. The Cronbach's alpha for internal consistency of the ANTS instrument was 0.93, and was 0.96 for the Ottawa GRS. There was a high correlation between the ANTS and Ottawa GRS. The raters reported the ease of use of the Ottawa GRS compared to the ANTS. We found sufficient evidence of validity in the ANTS instrument and the Ottawa GRS for the evaluation of non-technical skills in a simulated anaesthesia setting, but the Ottawa GRS was more practical and had higher reliability.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-20
... reporting requirements. Changes: None. Focus TA on Assessment and Discipline Data Comment: Three commenters agreed with the importance of focusing on assessment and discipline data, and two commenters agreed with... decisions and actions associated with data collection and reporting. One commenter stated that assessment...
Assessment of Learning Disabilities.
ERIC Educational Resources Information Center
Shepard, Lorrie A.
The assessment and diagnosis of learning disabilities (LD) in the school is problematic. How do educators determine who is learning disabled? What practices are recommended? The main focus of the paper is on specific, relatively technical points that influence the validity of assessment. Since technical concerns are only one of the factors…
Concepts for a NASA Applied Spaceflight Environments Office
NASA Technical Reports Server (NTRS)
Edwards, David L.; Burns, Howard D.; Xapsos, Michael; Spann, Jim; Suggs, Robert
2010-01-01
The National Aeronautics and Space Administration (NASA) is launching a bold and ambitious new space initiative. A significant part of this new initiative includes exploration of new worlds, the development of more innovative technologies, and expansion our presence in the solar system. A common theme to this initiative is the exploration of space beyond Low Earth Orbit (LEO). As currently organized, NASA does not have an Agency-level office that provides coordination of space environment research and development. This has contributed to the formation of a gap between spaceflight environments knowledge and the application of this knowledge for multi-program use. This paper outlines a concept to establish a NASA-level Applied Spaceflight Environments (ASE) office that will provide coordination and funding for sustained multi-program support in three technical areas that have demonstrated these needs through customer requests. These technical areas are natural environments characterization and modeling, materials and systems analysis and test, and operational space environments modeling and prediction. This paper will establish the need for the ASE, discuss a concept for organizational structure and outline the scope in the three technical areas
ERIC Educational Resources Information Center
CNA Corporation, 2005
2005-01-01
The Northeast Regional Advisory Committee (NE RAC) provides an assessment of the technical assistance needs of educators in the Northeast Region in response to a directive from the Secretary of the U.S. Department of Education (ED). The Secretary will use this assessment in establishing 20 comprehensive centers to provide technical assistance to…
ERIC Educational Resources Information Center
Park, Bitnara Jasmine; Alonzo, Julie; Tindal, Gerald
2011-01-01
This technical report describes the process of development and piloting of reading comprehension measures that are appropriate for seventh-grade students as part of an online progress screening and monitoring assessment system, http://easycbm.com. Each measure consists of an original fictional story of approximately 1,600 to 1,900 words with 20…
A History of the ARPANET: The First Decade
1981-04-01
10 2.2 Major Technical Problems and Approaches 11-12 2.3 Major Changes in Objectives and Approaches 11-19 3, ,3 Scientific and Technical Results and...successful projects ever undertaken by DARPA! The program has initiated extensive changes in the Defense Department’s use of computers as well as in...the ARPANET project represents a similarly far-reaching change in the use of computers by mankind. The full impact of the technical changes set in
NASA Technical Reports Server (NTRS)
Raiman, Laura B.
1992-01-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
NASA Astrophysics Data System (ADS)
Raiman, Laura B.
1992-12-01
Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .
Kim, Stanley E; Case, J Brad; Lewis, Daniel D; Ellison, Gary W
2015-08-01
To determine how American College of Veterinary Surgeons (ACVS) small animal surgery residency programs are teaching and assessing technical skills, and ascertain the perceived value of those methods. Internet-based survey. Residents and Diplomate supervisors of ACVS small animal residency programs. Residents and supervisors were surveyed on their experience of surgery instruction, use of different resources for teaching, type and frequency of feedback, and perceived effectiveness of their programs in imparting technical proficiency. A total of 130 residents (62%) and 119 supervisors (44%) participated. Both residents and supervisors estimated the resident was the primary surgeon for a mean of 64% of cases, although this proportion varied widely between participants. The majority of residents and supervisors considered that direct intraoperative guidance was the most effective way for residents to develop technical skills. Verbal interactions between supervisor and resident occurred frequently and were highly valued. Regular wet laboratories and access to simulation models were uncommon. Despite over 90% of all participants reporting that a sufficient level of technical aptitude would be attained, only 58% of residents were satisfied with their technical skills training. Residents relied on direct interaction with supervisors to develop technical skills. The traditional mode of instruction for veterinary residents is the apprenticeship model, which is partly driven by ACVS requirements of supervisory support. Exposure to other teaching and assessment methods was variable. The current structure of residency programs is successful in imparting technical competency as perceived by supervisors and residents. However, consideration of a more formal method of residency training with structured assessment of technical skills as in human medicine should not be dismissed. © Copyright 2015 by The American College of Veterinary Surgeons.
Smart roadside initiative gap analysis : target functionality and gap analysis.
DOT National Transportation Integrated Search
2015-02-01
This document summarizes the target functionality for the Smart Roadside Initiative, as well as the operational, institutional, and technical gaps that currently impede the deployment of three of its operational scenarios (electronic mainline s...
Civil Space Technology Initiative: a First Step
NASA Technical Reports Server (NTRS)
1988-01-01
This is the first published overview of OAST's focused program, the Civil Space Technology Initiative, (CSTI) which started in FY88. This publication describes the goals, technical approach, current status, and plans for CSTI. Periodic updates are planned.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Roberts, Joseph Owen; Mosey, Gail
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Newport Indiana Chemical Depot site in Newport, Indiana, for a feasibility study of renewable energy production. The National Renewable Energy Laboratory (NREL) was contacted to provide technical assistance for this project. The purpose of this report is to assess the sitefor possible wind turbine electrical generator installation and estimate the cost, performance, and site impacts of different wind energy options. In addition, the report recommends financing options that could assist in the implementation of a wind system at the site.
NASA's computer science research program
NASA Technical Reports Server (NTRS)
Larsen, R. L.
1983-01-01
Following a major assessment of NASA's computing technology needs, a new program of computer science research has been initiated by the Agency. The program includes work in concurrent processing, management of large scale scientific databases, software engineering, reliable computing, and artificial intelligence. The program is driven by applications requirements in computational fluid dynamics, image processing, sensor data management, real-time mission control and autonomous systems. It consists of university research, in-house NASA research, and NASA's Research Institute for Advanced Computer Science (RIACS) and Institute for Computer Applications in Science and Engineering (ICASE). The overall goal is to provide the technical foundation within NASA to exploit advancing computing technology in aerospace applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geiger, J.; Lisell, L.; Mosey, G.
2013-07-01
The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Pueblo of Santo Domingo in Sandoval County, New Mexico, for a renewable energy production feasibility study. The National Renewable Energy Laboratory (NREL) provided technical assistance for this project. The purpose of this report is to assess specific areas on the Pueblo for potential installation of photovoltaic (PV) systems and to estimate the cost, performance, and site impacts of different PV options. The report also recommends financing options that could assist in the implementation of these PV systems.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Juberg, D.R.; Loch-Caruso, R.
Elevated levels of DDT and other organochlorine pesticides have been associated with spontaneous abortion and preterm birth in several species, including humans. Despite the prevalence of organochlorine pesticides in the environment, a mechanistic basis for this association has not been explored. Furthermore, while DDT has been associated with inhibition of calcium ATPases, altered gap junctional communication and electrophysiological changes, all of which could affect the excitation-contraction process characteristic of smooth muscle, direct effects of DDT on uterine smooth muscle have not been reported. This study was initiated to assess the direct effects of o,p{prime}-DDT (an estrogenic isomer present in themore » technical grade preparation) on pregnant rat uterine tissue.« less
New tools and approaches to newborn screening: ready to open Pandora's box?
Ficicioglu, Can
2017-05-01
The landscape of newborn screening (NBS) is changing as new tools are developed. We must acknowledge that NBS is a very important and extraordinarily positive initiative especially for rare and serious inherited disorders; however, lessons learned from current NBS should guide the future of NBS as we enter the era of "omics" that will expand NBS for many other genetic disorders. In this article, I will first discuss new tools such as genomics and metabolomics for NBS. I will then turn to assessing how best to take advantage of new technical developments while considering the best interests of patients and the success of newborn screening.
Doucet, Michèle Y; Vrins, André
2010-01-01
Annual alumni and employer surveys, initially designed as outcomes assessment tools, were integrated into a new internal quality assurance strategy to improve the doctor of veterinary medicine program at the University of Montreal's Faculté de Médecine Vétérinaire. Data collected annually from the classes of 2004-2007 indicated that alumni and their employers were generally satisfied with their level of preparation after one year of professional activity. Specific weaknesses were found in non-technical skills such as communication and resource management. These data were used in support of other forms of feedback to guide curricular reform.
Integrated Technology Rotor/Flight Research Rotor (ITR/FRR) concept definition
NASA Technical Reports Server (NTRS)
Harse, J. H.
1983-01-01
A program was performed to identify and evaluate a variety of candidate rotor hub configurations for the ITR/FRR. Design criteria were established for the development of the hub concepts. Eight initial hub configurations were examined and two were selected for further refinement and evaluation. The selected concepts were bearingless designs with and without lead-lag dampers. The selected concepts were refined to the point that their physical properties relative to the Government's technical goals and manufacturing aspects could be assessed. In addition, variations that could be incorporated for the FRR were identified and compatibility for installation on the RSRA was addressed.
Dieter, H H; Mückter, H
2007-03-01
More than 2500 chemically defined substances are approved as drugs in Germany. Unlike agricultural pesticides, these biologically active structures are not used in open environmental compartments and therefore their environmental toxicological data base is not nearly as complete. Nevertheless, some of them become environmental contaminants after their intended use. Therefore, from the viewpoint of environmental health protection, there are gaps in their health-related environmental risk assessment. Organic trace compounds that lack an adequate toxicological database, and their mixtures, in drinking water can be safely regulated and provisionally assessed by combining the "similar joint action" addition rule with the recommendation of the Federal Environment Agency of March 2003 "Assessing the presence of substances in drinking water without (adequate) toxicological database from the health point of view". The general precautionary value (Gesundheitlicher Orientierungswert GOW1=0.10 microg/l), which is a recommendation for weakly to not genotoxic compounds, re presents a workable compromise between preventive health protection, water management considerations and aesthetic quality claims (purity). Compliance with this value in the long term will only be possible if the chemical and biological degradation of pharmaceuticals and their metabolites in waste water and waste water treatment plants is effectively improved. Alternatively, there is the risk of drinking water degenerating into a sink for highly mobile, polar and persistent compounds. Their elimination at a stage as late as technical drinking water treatment would be neither close to the initial cause nor justifiable in terms of technical effectiveness. The risk assessment of their byproducts would give rise to further uncertainties. Possible conflicts with the therapeutic quality must be solved by developing substitute products which are environmentally sound.
Technical Risk Assessment. The Status of Current DoD Efforts
1986-04-01
naililgocrsf .rv iC’.ti-I ’N tpi). 33-51 andti 62-7, 1 Prinicipal Findings Risk Assessment Guidance [will hats lidft i1fied many technical risk appro ach...8217Ertjvhcs Firt licr. ino st1andlard d1efiitio ’ n oft eciunival ris.k extsts. wit tim twitl.. A t iorifti nv. many program offivi-t have develtoped t he...based ol (fhe technical risk assessnient for the system. Assessment has many % possible approar!:"s. 1 ’siiahly. one- or moh re tech- nical experts
The California spotted owl: a technical assessment of its current status
Jared Verner; Kevin S. McKelvey; Barry R. Noon; R. J. Gutierrez; Gordon I. Jr. Gould; Thomas W. Beck
1992-01-01
This report is based an the Final Repart submitted on May 8, 1992 by the Technical Assessment Team to the interagency Steering Committee for the California Spotted Owl Assessment. The 13 chapters cover the assessment of the current status of the California spotted owl, its biology and habitat use, and forests where the subspecies occurs in the Sierra Nevada and...
24 CFR 901.235 - Technical assistance.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Technical assistance. 901.235... DEVELOPMENT PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM § 901.235 Technical assistance. (a) The Department may provide technical assistance to a PHA that is in substantial default. (b) The Department may...
NASA Technical Reports Server (NTRS)
Sawyer, J. C., Jr.
1993-01-01
The activities of the joint NASA/DOE/DOD Nuclear Propulsion Program Technical Panels have been used as the basis for the current development of safety policies and requirements for the Space Exploration Initiatives (SEI) Nuclear Propulsion Technology development program. The Safety Division of the NASA Office of Safety and Mission Quality has initiated efforts to develop policies for the safe use of nuclear propulsion in space through involvement in the joint agency Nuclear Safety Policy Working Group (NSPWG), encouraged expansion of the initial policy development into proposed programmatic requirements, and suggested further expansion into the overall risk assessment and risk management process for the NASA Exploration Program. Similar efforts are underway within the Department of Energy to ensure the safe development and testing of nuclear propulsion systems on Earth. This paper describes the NASA safety policy related to requirements for the design of systems that may operate where Earth re-entry is a possibility. The expected plan of action is to support and oversee activities related to the technology development of nuclear propulsion in space, and support the overall safety and risk management program being developed for the NASA Exploration Program.
Responding to the professionalism of learners and faculty in orthopaedic surgery.
Arnold, Louise
2006-08-01
Recent developments in assessing professionalism and remediating unprofessional behavior can curtail the inaction that often follows observations of negative as well as positive professionalism of learners and faculty. Developments include: longitudinal assessment models promoting professional behavior, not just penalizing lapses; clarity about the assessment's purpose; methods separating formative from summative assessment; conceptual and behavioral definitions of professionalism; techniques increasing the reliability and validity of quantitative and qualitative approaches to assessment such as 360-degree assessments, performance-based assessments, portfolios, and humanism connoisseurs; and systems-design providing infrastructure support for assessment. Models for remediation have been crafted, including: due process, a warning period and, if necessary, confrontation to initiate remediation of the physician who has acted unprofessionally. Principles for appropriate remediation stress matching the intervention to the cause of the professional lapse. Cognitive behavioral therapy, motivational interviewing, and continuous monitoring linked to behavioral contracts are effective remediation techniques. Mounting and maintaining robust systems for professionalism and remediating professional lapses are not easy tasks. They require a sea change in the fundamental goal of academic health care institutions: medical education must not only be a technical undertaking but also a moral process designed to build and sustain character in all its professional citizens.
Brunckhorst, Oliver; Shahid, Shahab; Aydin, Abdullatif; Khan, Shahid; McIlhenny, Craig; Brewin, James; Sahai, Arun; Bello, Fernando; Kneebone, Roger; Shamim Khan, Muhammad; Dasgupta, Prokar; Ahmed, Kamran
2015-01-01
Little integration of technical and nontechnical skills (e.g., situational awareness, communication, decision making, teamwork, and leadership) teaching exists within surgery. We therefore aimed to (1) evaluate the relationship between these 2 skill sets within a simulation-based environment and (2) assess if certain nontechnical skill components are of particular relevance to technical performance. A prospective analysis of data acquired from a comparative study of simulation vs nonsimulation training was conducted. Half of the participants underwent training of technical and nontechnical skills within ureteroscopy, with the remaining half undergoing no training. All were assessed within a full immersion environment against both technical (time to completion, Objective Structured Assessment of Technical Skills, and task-specific checklist scores) and nontechnical parameters (Nontechnical Skills for Surgeons [NOTSS] rating scale). The data of whole and individual cohorts were analyzed using Pearson correlation coefficient. The trial took place within the Simulation and Interactive Learning Centre at Guy's Hospital, London, UK. In total, 32 novice participants with no prior practical ureteroscopy experience were included within the data analysis. A correlation was found within all outcome measures analyzed. For the whole cohort, a strong negative correlation was found between time to completion and NOTSS scores (r = -0.75, p < 0.001), with strong positive correlations identified when NOTSS scores were compared with Objective Structured Assessment of Technical Skills (r = 0.89, p < 0.001) and task-specific checklist scores (r = 0.91, p < 0.001). Similar results were observed when each cohort was analyzed separately. Finally, all individual nontechnical skill components demonstrated a strong correlation with all technical skill parameters, regardless of training. A strong correlation between technical and nontechnical performance exists, which was demonstrated to be irrespective of training received. This may suggest an inherent link between skill sets. Furthermore, all nontechnical skill sets are important in technical performance. This supports the notion that both of these skills should be trained and assessed together within 1 curriculum. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
The impact of nontechnical skills on technical performance in surgery: a systematic review.
Hull, Louise; Arora, Sonal; Aggarwal, Rajesh; Darzi, Ara; Vincent, Charles; Sevdalis, Nick
2012-02-01
Failures in nontechnical and teamwork skills frequently lie at the heart of harm and near-misses in the operating room (OR). The purpose of this systematic review was to assess the impact of nontechnical skills on technical performance in surgery. MEDLINE, EMBASE, PsycINFO databases were searched, and 2,041 articles were identified. After limits were applied, 341 articles were retrieved for evaluation. Of these, 28 articles were accepted for this review. Data were extracted from the articles regarding sample population, study design and setting, measures of nontechnical skills and technical performance, study findings, and limitations. Of the 28 articles that met inclusion criteria, 21 articles assessed the impact of surgeons' nontechnical skills on their technical performance. The evidence suggests that receiving feedback and effectively coping with stressful events in the OR has a beneficial impact on certain aspects of technical performance. Conversely, increased levels of fatigue are associated with detriments to surgical skill. One article assessed the impact of anesthesiologists' nontechnical skills on anesthetic technical performance, finding a strong positive correlation between the 2 skill sets. Finally, 6 articles assessed the impact of multiple nontechnical skills of the entire OR team on surgical performance. A strong relationship between teamwork failure and technical error was empirically demonstrated in these studies. Evidence suggests that certain nontechnical aspects of performance can enhance or, if lacking, contribute to deterioration of surgeons' technical performance. The precise extent of this effect remains to be elucidated. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
Selected Technical and Economic Comparisons of Synfuel Options
DOT National Transportation Integrated Search
1981-04-01
This study is a comparative technical and economic assessment of selected synfuel technologies. It contains papers written for Office of Technology Assessment (OTA) to assist in preparation of the report "Increased Automobile Fuel Efficiency and Synt...
FRATIS concept of operations : assess test readiness of FRATIS (task 4).
DOT National Transportation Integrated Search
2012-08-01
This technical memorandum presents a concise assessment of the key technical and nontechnical issues and limitations related to field-testing the Freight Advanced Traveler Information System (FRATIS) Dynamic Mobility Applications (DMA) bundle and its...
EPA coordinated a regional collaborative process with Central America and Dominican Republic Free Trade Agreement (CAFTA-DR) partners to develop Environmental Impact Assessment (EIA) Technical Review Guidelines for three sectors.
Expert Technical Committee : Bay Bridge Project Assessment meeting, January 6-8, 2005.
DOT National Transportation Integrated Search
2005-01-01
The Expert Technical Committee (ETC) was formed to provide an independent review and : assessment of the history and current status of the San Francisco-Oakland Bay Bridge East Span : Seismic Retrofit Cost Increases.
Verhoff, Marcel A; Kettner, Mattias; Lászik, András; Ramsthaler, Frank
2012-09-01
A problem encountered by medical examiners is that they have to assess injuries that have already been medically treated. Thus, they have to base their reports on clinical forensic examinations performed hours or days after an injury was sustained, or even base their assessment solely on information gleaned from medical files. In both scenarios, the forensic examiner has to rely heavily on the first responder's documentation of the original injury pattern. Medical priority will be to immediately treat a patient's injuries, and the first responder may, in addition, initially be unaware of a possibly criminal origin of an injury. As a result, the documentation of injuries is frequently of limited value for forensic purposes. This situation could be improved if photographic records were briefly made of injuries before they were treated. German-language medicolegal, criminal, and photography journals and books were selectively searched with the help of PubMed and other databases. In addition, the authors' experiences in creating and evaluating photographic records for clinical forensic use were assessed. This paper is an aid to creating photographic records of sufficient quality for forensic purposes. The options provided by digital photography in particular make this endeavor feasible even in a clinical setting. In addition, our paper illuminates some technical aspects of creating and archiving photographic records for forensic use, and addresses possible error sources. With the requisite technical background knowledge, injuries can be photographically recorded to forensic standards during patient care.
Operability assessment in CTEPH: Lessons from the CHEST-1 study.
Jenkins, David P; Biederman, Andrzej; D'Armini, Andrea M; Dartevelle, Philippe G; Gan, Hui-Li; Klepetko, Walter; Lindner, Jaroslav; Mayer, Eckhard; Madani, Michael M
2016-09-01
Pulmonary endarterectomy is the gold standard treatment for chronic thromboembolic pulmonary hypertension and is potentially curative, although some patients are unsuitable for pulmonary endarterectomy and require alternative management. Lack of standardized assessment of pulmonary endarterectomy eligibility risks suboptimal treatment in some patients. We discuss the implications for future clinical trials and practice of a unique operability assessment in patients who have chronic thromboembolic pulmonary hypertension and were initially screened for inclusion in the CHEST-1 (Chronic Thromboembolic Pulmonary Hypertension Soluble Guanylate Cyclase Stimulator Trial-1) study. The CHEST-1 study evaluated riociguat for the treatment of inoperable chronic thromboembolic pulmonary hypertension (CTEPH) or persistent/recurrent pulmonary hypertension after pulmonary endarterectomy. Screened patients who were initially considered "inoperable" underwent central independent adjudication by a committee of experienced surgeons, or local adjudication in collaboration with an experienced surgeon. Operability decisions were based on accessibility of thrombi and the association between pulmonary vascular resistance (PVR) and the extent of obstruction, using pulmonary angiography/computed tomography with ventilation/perfusion scintigraphy as the minimum diagnostic tests. Of 446 patients screened for CHEST-1, a total of 188 and 124 underwent central and local adjudication, respectively, after being initially considered to be "inoperable." After a second assessment by an experienced surgeon, 69 of these 312 "inoperable" patients were deemed operable. Rigorous measures in CHEST-1 guaranteed that only technically inoperable patients, or patients who had persistent/recurrent pulmonary hypertension, were enrolled, thus ensuring that only patients for whom surgery was not an option were enrolled. This study design sets new standards for future clinical trials and practice in CTEPH, helping to ensure that patients who have CTEPH receive optimal treatment. Copyright © 2016 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.
Review of the Primary National Ambient Air Quality Standards ...
The U.S. Environmental Protection Agency (EPA) is conducting a review of the air quality criteria and the primary (health-based) national ambient air quality standards (NAAQS) for nitrogen dioxide (NO2). The major phases of the process for reviewing NAAQS include the following: (1) planning, (2) science assessment, (3) risk and exposure assessment, and (4) policy assessment. As an initial step in the risk and exposure assessment phase, EPA staff has considered the extent to which updated quantitative analyses of NO2 exposures and/or NO2-attributable health risks are warranted in the current review, based on the available scientific evidence and technical information. These considerations focus on the degree to which important uncertainties identified in quantitative analyses from the last review have been addressed by newly available evidence, tools, or information. The purpose of the REA planning document is to present staff's considerations and preliminary conclusions regarding potential updated quantitative analyses in the current review of the primary NO2 NAAQS. Provide opportunity for CASAC feedback on EPA's plans for the risk and exposure assessment for the Nitrogen Oxides NAAQS review
Indicators for International Comparison of Military-Technical Innovation
1999-04-01
Glover, ed., War Theory Coursebook ,. (Maxwell AFB, AL: Air Command and Staff College, 1998), 34. 2 Andrew F. Krepinevich, Jr., “The Military-Technical...Revolution: A Preliminary Assessment,” in Air Command and Staff College War Theory Coursebook , ed. Gwen Story and Sybill Glover, (Maxwell AFB, AL: Air...Military-Technical Revolution: A Preliminary Assessment,” in Air Command and Staff College War Theory Coursebook , ed. Gwen Story and Sybill Glover
1991-01-01
Peter R.; James D. Schriner; Bettie F. Farace ; and Richard V. Farace . The Assessment of NASA Technical Information. NASA CR-181367. Washington, DC... Farace ; and Richard V. Farace . The Assessment of NASA Technical Information. NASA CR-181367. Washington, DC: National Aeronautics and Space
Michinov, Estelle; Jamet, Eric; Dodeler, Virginie; Haegelen, Claire; Jannin, Pierre
2014-10-01
The management of non-technical skills is a major factor affecting teamwork quality and patient safety. This article presents a behavioural marker system for assessing neurosurgical non-technical skills (BMS-NNTS). We tested the BMS during deep brain stimulation surgery. We developed the BMS in three stages. First, we drew up a provisional assessment tool based on the literature and observation tools developed for other surgical specialties. We then analysed videos made in an operating room (OR) during deep brain stimulation operations in order to ensure there were no significant omissions from the skills list. Finally, we used five videos of operations to identify the behavioural markers of non-technical skills in verbal communications. Analyses of more than six hours of observations revealed 3515 behaviours from which we determined the neurosurgeon's non-technical skills behaviour pattern. The neurosurgeon frequently engaged in explicit coordination, situation awareness and leadership behaviours. In addition, the neurosurgeon's behaviours differed according to the stage of the operation and the OR staff members with whom she was communicating. Our behavioural marker system provides a structured approach to assessing non-technical skills in the field of neurosurgery. It can also be transferred to other surgical specialties and used in surgeon training curricula. © 2014 John Wiley & Sons, Ltd.
ERIC Educational Resources Information Center
Carter, Michael; Anson, Chris M.; Miller, Carolyn R.
2003-01-01
Notes that technical writing instruction often operates in isolation from other components of students' communication education. Argues for altering this isolation by moving writing instruction to a place of increased programmatic perspective, which may be attained through a means of assessment based on educational outcomes. Discusses two models…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-04
... Information Collection for Public Comment: OneCPD Technical Assistance and Capacity Building Needs Assessment... Needs Assessment. Description of the need for the information proposed: The OneCPD Needs Assessment will... to identify trends in TA needs across grantees and assist in prioritizing the development of tools...
Practicality of intraoperative teamwork assessments.
Phitayakorn, Roy; Minehart, Rebecca; Pian-Smith, May C M; Hemingway, Maureen W; Milosh-Zinkus, Tanya; Oriol-Morway, Danika; Petrusa, Emil
2014-07-01
High-quality teamwork among operating room (OR) professionals is a key to efficient and safe practice. Quantification of teamwork facilitates feedback, assessment, and improvement. Several valid and reliable instruments are available for assessing separate OR disciplines and teams. We sought to determine the most feasible approach for routine documentation of teamwork in in-situ OR simulations. We compared rater agreement, hypothetical training costs, and feasibility ratings from five clinicians and two nonclinicians with instruments for assessment of separate OR groups and teams. Five teams of anesthesia or surgery residents and OR nurses (RN) or surgical technicians were videotaped in simulations of an epigastric hernia repair where the patient develops malignant hyperthermia. Two anesthesiologists, one OR clinical RN specialist, one educational psychologist, one simulation specialist, and one general surgeon discussed and then independently completed Anesthesiologists' Non-Technical Skills, Non-Technical Skills for Surgeons, Scrub Practitioners' List of Intraoperative Non-Technical Skills, and Observational Teamwork Assessment for Surgery forms to rate nontechnical performance of anesthesiologists, surgeons, nurses, technicians, and the whole team. Intraclass correlations of agreement ranged from 0.17-0.85. Clinicians' agreements were not different from nonclinicians'. Published rater training was 4 h for Anesthesiologists' Non-Technical Skills and Scrub Practitioners' List of Intraoperative Non-Technical Skills, 2.5 h for Non-Technical Skills for Surgeons, and 15.5 h for Observational Teamwork Assessment for Surgery. Estimated costs to train one rater to use all instruments ranged from $442 for a simulation specialist to $6006 for a general surgeon. Additional training is needed to achieve higher levels of agreement; however, costs may be prohibitive. The most cost-effective model for real-time OR teamwork assessment may be to use a simulation technician combined with one clinical rater to allow complete documentation of all participants. Copyright © 2014 Elsevier Inc. All rights reserved.
Final Ports Initiative Workgroup Report: Recommendations for the U.S. EPA
The Port Initiative Workgroup was organized under the Clean Air Act Advisory Committee for the purpose of discussing and identifying recommendations related to Ports. The workgroup is part of the Mobile Sources Technical Review Subcommittee.
Prevention of Roller Bearing-Initiated Burnoffs in Railroad Freight Car Journals
DOT National Transportation Integrated Search
1979-01-01
The objective of this program was to determine the technical feasibility and cost effectiveness of constructing three separate devices for the prevention of catastrophic roller bearing-initiated, railroad journal failure. 1. Construction of a low cos...
Aeroelasticity Benchmark Assessment: Subsonic Fixed Wing Program
NASA Technical Reports Server (NTRS)
Florance, Jennifer P.; Chwalowski, Pawel; Wieseman, Carol D.
2010-01-01
The fundamental technical challenge in computational aeroelasticity is the accurate prediction of unsteady aerodynamic phenomena and the effect on the aeroelastic response of a vehicle. Currently, a benchmarking standard for use in validating the accuracy of computational aeroelasticity codes does not exist. Many aeroelastic data sets have been obtained in wind-tunnel and flight testing throughout the world; however, none have been globally presented or accepted as an ideal data set. There are numerous reasons for this. One reason is that often, such aeroelastic data sets focus on the aeroelastic phenomena alone (flutter, for example) and do not contain associated information such as unsteady pressures and time-correlated structural dynamic deflections. Other available data sets focus solely on the unsteady pressures and do not address the aeroelastic phenomena. Other discrepancies can include omission of relevant data, such as flutter frequency and / or the acquisition of only qualitative deflection data. In addition to these content deficiencies, all of the available data sets present both experimental and computational technical challenges. Experimental issues include facility influences, nonlinearities beyond those being modeled, and data processing. From the computational perspective, technical challenges include modeling geometric complexities, coupling between the flow and the structure, grid issues, and boundary conditions. The Aeroelasticity Benchmark Assessment task seeks to examine the existing potential experimental data sets and ultimately choose the one that is viewed as the most suitable for computational benchmarking. An initial computational evaluation of that configuration will then be performed using the Langley-developed computational fluid dynamics (CFD) software FUN3D1 as part of its code validation process. In addition to the benchmarking activity, this task also includes an examination of future research directions. Researchers within the Aeroelasticity Branch will examine other experimental efforts within the Subsonic Fixed Wing (SFW) program (such as testing of the NASA Common Research Model (CRM)) and other NASA programs and assess aeroelasticity issues and research topics.
A Strategic Plan for Texas State Technical Institute.
ERIC Educational Resources Information Center
Texas State Technical Inst., Waco.
Following two decades of growth, both enrollment and funding at the Texas State Technical Institute (TSTI) have declined sharply over the last 5 years. In April 1989, the TSTI initiated a strategic planning process incorporating a strategy based on meeting a clearly recognized and understood public need that is within the role, scope, and mission…
The Users and Uses of Scientific and Technical Information: Critical Research Needs.
ERIC Educational Resources Information Center
Freeman, James E.; Rubenstein, Albert H.
At a 1973 workshop held in Denver, Colorado, 21 participants familiar with the uses of Scientific and Technical Information (STI) services gathered to identify the system's major research needs. Initially, 50 research projects were suggested in the areas of design, management, operations, marketing, and global considerations. Using a priority…
Appeal Resource and Training Consortium (ARTC) 2005-2006
ERIC Educational Resources Information Center
Online Submission, 2006
2006-01-01
APPEAL (Asia Pacific Programme of Education for All) Resource and Training Consortium (ARTC) was initiated in May 1997 at the Technical Working Group Meeting organized by APPEAL in cooperation with the Indian Institute of Education (IIE) to provide technical support and assistance to the work of APPEAL among the Member States. This booklet is a…
Technical and Further Education (TAFE) Head Teachers: Their Changing Role
ERIC Educational Resources Information Center
Rice, Ann
2005-01-01
Change in Technical and Further Education (TAFE) in Australia is being driven by government initiatives that must be operationalised at the college level. Head teachers are the frontline managers in these colleges, who have to ensure their sections are responsive to the changes while also meeting the educational requirements of their traditional…
Content Analysis as a Best Practice in Technical Communication Research
ERIC Educational Resources Information Center
Thayer, Alexander; Evans, Mary; McBride, Alicia; Queen, Matt; Spyridakis, Jan
2007-01-01
Content analysis is a powerful empirical method for analyzing text, a method that technical communicators can use on the job and in their research. Content analysis can expose hidden connections among concepts, reveal relationships among ideas that initially seem unconnected, and inform the decision-making processes associated with many technical…
How family carers engage with technical health procedures in the home: a grounded theory study.
McDonald, Janet; McKinlay, Eileen; Keeling, Sally; Levack, William
2015-07-06
To explore the experiences of family carers who manage technical health procedures at home and describe their learning process. A qualitative study using grounded theory. New Zealand family carers (21 women, 5 men) who managed technical health procedures such as enteral feeding, peritoneal dialysis, tracheostomy care, a central venous line or urinary catheter. In addition, 15 health professionals involved in teaching carers were interviewed. Semistructured interviews were coded soon after completion and preliminary analysis influenced subsequent interviews. Additional data were compared with existing material and as analysis proceeded, initial codes were grouped into higher order concepts until a core concept was described. Interviewing continued until no new ideas emerged and concepts were well defined. The response of carers to the role of managing technical health procedures in the home is presented in terms of five dispositions: (1) Embracing care, (2) Resisting, (3) Reluctant acceptance, (4) Relinquishing and (5) Being overwhelmed. These dispositions were not static and carers commonly changed between them. Embracing care included cognitive understanding of the purpose and benefits of a procedure; accepting a 'technical' solution; practical management; and an emotional response. Accepting embrace is primarily motivated by perceived benefits for the recipient. It may also be driven by a lack of alternatives. Resisting or reluctant acceptance results from a lack of understanding about the procedure or willingness to manage it. Carers need adequate support to avoid becoming overwhelmed, and there are times when it is appropriate to encourage them to relinquish care for the sake of their own needs. The concept of embracing care encourages health professionals to extend their attention beyond simply the practical aspects of technical procedures to assessing and addressing carers' emotional and behavioural responses to health technology during the training process. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.
Bowen, Zachary H.; Aldridge, Cameron L.; Anderson, Patrick J.; Assal, Timothy J.; Baer, Lori Anne; Bristol, R. Sky; Carr, Natasha B.; Chong, Geneva W.; Diffendorfer, Jay E.; Fedy, Bradley C.; Garman, Steven L.; Germaine, Stephen S.; Grauch, Richard I.; Homer, Collin G.; Manier, Daniel J.; Kauffman, Matthew J.; Latysh, Natalie; Melcher, Cynthia P.; Miller, Kirk A.; Montag, Jessica; Nutt, Constance J.; Potter, Christopher; Sawyer, Hall; Smith, David B.; Sweat, Michael J.; Wilson, Anna B.
2009-01-01
The Wyoming Landscape Conservation Initiative (WLCI) was launched in 2007 in response to concerns about threats to the State's world class wildlife resources, especially the threat posed by rapidly increasing energy development in southwest Wyoming. The overriding purpose of the WLCI is to assess and enhance aquatic and terrestrial habitats at a landscape scale, while facilitating responsible energy and other types of development. The WLCI includes partners from Federal, State, and local agencies, with participation from public and private entities, industry, and landowners. As a principal WLCI partner, the U.S. Geological Survey (USGS) provides multidisciplinary scientific and technical support to inform decisionmaking in the WLCI. To address WLCI management needs, USGS has designed and implemented five integrated work activities: (1) Baseline Synthesis, (2) Targeted Monitoring and Research, (3) Integration and Coordination, (4) Data and Information Management, and (5) Decisionmaking and Evaluation. Ongoing information management of data and products acquired or generated through the integrated work activities will ensure that crucial scientific information is available to partners and stakeholders in a readily accessible and useable format for decisionmaking and evaluation. Significant progress towards WLCI goals has been achieved in many Science and Technical Assistance tasks of the work activities. Available data were identified, acquired, compiled, and integrated into a comprehensive database for use by WLCI partners and to support USGS science activities. A Web-based platform for sharing these data and products has been developed and is already in use. Numerous map products have been completed and made available to WLCI partners, and other products are in progress. Initial conceptual, habitat, and climate change models have been developed or refined. Monitoring designs for terrestrial and aquatic indicators have been completed, pilot data have been collected for terrestrial indicators, and evaluations of alternative monitoring designs are underway. Initial models and map products have been developed for assessing vegetation, surface disturbance, oil and gas resources, mineral resources, surficial geology, invasive species, aspen treatments, ungulate migration corridors, greater sage-grouse (Centrocercus urophasianus), pygmy rabbits (Brachylagus idahoensis), and songbirds, and data were collected or compiled to validate and refine the models. Coordination and collaboration among partners has led to the production of several documents addressing WLCI objectives, strategies, and guiding principles, and has facilitated implementation of on-the-ground habitat treatments.
technical Hexachlorocyclohexane (t-HCH)
Integrated Risk Information System (IRIS)
technical Hexachlorocyclohexane ( t - HCH ) ; CASRN 608 - 73 - 1 Human health assessment information on a chemical substance is included in the IRIS database only after a comprehensive review of toxicity data , as outlined in the IRIS assessment development process . Sections I ( Health Hazard Asses
NASA Technical Reports Server (NTRS)
Morrison, D.
2001-01-01
The new discipline of astrobiology addresses fundamental questions about life in the universe: "Where did we come from?" "Are we alone in the universe?" "What is our future beyond the Earth?" Developing capabilities in biotechnology, informatics, and space exploration provide new tools to address these old questions. The U.S. National Aeronautics and Space Administration (NASA) has encouraged this new discipline by organizing workshops and technical meetings, establishing a NASA Astrobiology Institute, providing research funds to individual investigators, ensuring that astrobiology goals are incorporated in NASA flight missions, and initiating a program of public outreach and education. Much of the initial effort by NASA and the research community was focused on determining the technical content of astrobiology. This paper discusses the initial answer to the question "What is astrobiology?" as described in the NASA Astrobiology Roadmap.
The NASA astrobiology program.
Morrison, D
2001-01-01
The new discipline of astrobiology addresses fundamental questions about life in the universe: "Where did we come from?" "Are we alone in the universe?" "What is our future beyond the Earth?" Developing capabilities in biotechnology, informatics, and space exploration provide new tools to address these old questions. The U.S. National Aeronautics and Space Administration (NASA) has encouraged this new discipline by organizing workshops and technical meetings, establishing a NASA Astrobiology Institute, providing research funds to individual investigators, ensuring that astrobiology goals are incorporated in NASA flight missions, and initiating a program of public outreach and education. Much of the initial effort by NASA and the research community was focused on determining the technical content of astrobiology. This paper discusses the initial answer to the question "What is astrobiology?" as described in the NASA Astrobiology Roadmap.
1996 DOE technical standards program workshop: Proceedings
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-07-01
The workshop theme is `The Strategic Standardization Initiative - A Technology Exchange and Global Competitiveness Challenge for DOE.` The workshop goal is to inform the DOE technical standards community of strategic standardization activities taking place in the Department, other Government agencies, standards developing organizations, and industry. Individuals working on technical standards will be challenged to improve cooperation and communications with the involved organizations in response to the initiative. Workshop sessions include presentations by representatives from various Government agencies that focus on coordination among and participation of Government personnel in the voluntary standards process; reports by standards organizations, industry, and DOEmore » representatives on current technology exchange programs; and how the road ahead appears for `information superhighway` standardization. Another session highlights successful standardization case studies selected from several sites across the DOE complex. The workshop concludes with a panel discussion on the goals and objectives of the DOE Technical Standards Program as envisioned by senior DOE management. The annual workshop on technical standards has proven to be an effective medium for communicating information related to standards throughout the DOE community. Technical standards are used to transfer technology and standardize work processes to produce consistent, acceptable results. They provide a practical solution to the Department`s challenge to protect the environment and the health and safety of the public and workers during all facility operations. Through standards, the technologies of industries and governments worldwide are available to DOE. The DOE Technical Standards Program, a Department-wide effort that crosscuts all organizations and disciplines, links the Department to those technologies.« less
Yule, Steven; Parker, Sarah Henrickson; Wilkinson, Jill; McKinley, Aileen; MacDonald, Jamie; Neill, Adrian; McAdam, Tim
2015-01-01
To investigate the effect of coaching on non-technical skills and performance during laparoscopic cholecystectomy in a simulated operating room (OR). Non-technical skills (situation awareness, decision making, teamwork, and leadership) underpin technical ability and are critical to the success of operations and the safety of patients in the OR. The rate of developing assessment tools in this area has outpaced development of workable interventions to improve non-technical skills in surgical training and beyond. A randomized trial was conducted with senior surgical residents (n = 16). Participants were randomized to receive either non-technical skills coaching (intervention) or to self-reflect (control) after each of 5 simulated operations. Coaching was based on the Non-Technical Skills For Surgeons (NOTSS) behavior observation system. Surgeon-coaches trained in this method coached participants in the intervention group for 10 minutes after each simulation. Primary outcome measure was non-technical skills, assessed from video by a surgeon using the NOTSS system. Secondary outcomes were time to call for help during bleeding, operative time, and path length of laparoscopic instruments. Non-technical skills improved in the intervention group from scenario 1 to scenario 5 compared with those in the control group (p = 0.04). The intervention group was faster to call for help when faced with unstoppable bleeding in the final scenario (no. 5; p = 0.03). Coaching improved residents' non-technical skills in the simulated OR compared with those in the control group. Important next steps are to implement non-technical skills coaching in the real OR and assess effect on clinically important process measures and patient outcomes. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
Katsoulis, Joannis; Takeichi, Takuro; Sol Gaviria, Ana; Peter, Lukas; Katsoulis, Konstantinos
Compromised fit between the contact surfaces of screw-retained implant-supported fixed dentures (IFDs) is thought to create uncontrolled strains in the prosthetic components and peri-implant tissues, thus evoking biological and technical complications such as bone loss, screw loosening, component fractures and, at worst, loss of implants or prostheses. The aim of this systematic review was to evaluate the impact of marginal misfit on the clinical outcomes of IFDs, and to elucidate definition and assessment methods for passive fit. A systematic review of the literature was conducted with a PICO question: "For partially or complete edentulous subjects with screw-retained IFDs, does the marginal misfit at the implant-prosthesis interfaces have an impact on the clinical outcomes?". A literature search was performed electronically in PubMed (MEDLINE) with the help of Boolean operators to combine key words, and by hand search in relevant journals. English written in vivo studies published before August 31, 2016 that reported on both clinical outcome and related implant prosthesis misfit (gap, strains, torque) were selected using predetermined inclusion criteria. The initial search yielded 2626 records. After screening and a subsequent filtering process, five human and five animal studies were included in the descriptive analysis. The selected studies used different methods to assess misfit (linear distortion, vertical gap, strains, screw torque). While two human studies evaluated the biological response and technical complications prospectively over 6 and 12 months, the animal studies had an observation period < 12 weeks. Four human studies analysed retrospectively the 3 to 32 years' outcomes. Screw-related complications were observed, but biological sequelae could not be confirmed. Although the animal studies had different designs, bone adaptation and implant displacement was found in histological analyses. Due to the small number of studies and the heterogenic designs and misfit assessment methods, no meta-analysis of the data could be performed. The current literature provides insufficient evidence as to the effect of misfit at the prosthesis-implant interface on clinical outcomes of screw-retained implant-supported fixed dentures. Marginal gaps and static strains due to screw tightening were not found to have negative effects on initial osseointegration or peri-implant bone stability over time. Based on two clinical studies, the risk for technical screw-related complications was slightly higher. While the degree of tolerable misfit remains a matter of debate, the present data do not imply that clinicians neglect good fit, but aim to achieve the least misfit possible. Conflict of interest statement: The authors declare no conflict of interest. The review was conducted as part of the 2016 Foundation of Oral Rehabilitation Consensus Conference on "Prosthetic Protocols in Implant-based Oral Rehabilitation".
ERIC Educational Resources Information Center
Center for Research on Evaluation, Standards, and Student Testing, Los Angeles, CA.
The Center for Research on Evaluation, Standards, and Student Testing (CRESST) has developed an Alternative Assessments in Practice Data Base to support technical assistance needs and to promote the exchange of new assessment ideas. The database is designed to provide easy access and retrieval of information about ongoing and newly developed…
Technical Writing: Past, Present, and Future.
ERIC Educational Resources Information Center
Mathes, J. C., Comp.; Pinelli, Thomas E., Comp.
This compilation of papers addresses the history, present status, and trends of technical and related writing. The first of the eight papers surveys the present environment of the technical report and assesses the effectiveness of the technical report format of the National Aeronautics and Space Administration (NASA) in transmitting information.…
Project T.E.A.M. (Technical Education Advancement Modules). Final Report.
ERIC Educational Resources Information Center
Greenville Technical Coll., SC.
Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training, created an introductory technical training program and a consumer education package emphasizing the benefits of technical training. The curriculum and training focus of the project began with an assessment of employee needs in…
The NASA "PERS" Program: Solid Polymer Electrolyte Development for Advanced Lithium-Based Batteries
NASA Technical Reports Server (NTRS)
Baldwin, Richard S.; Bennett, William R.
2007-01-01
In fiscal year 2000, The National Aeronautics and Space Administration (NASA) and the Air Force Research Laboratory (AFRL) established a collaborative effort to support the development of polymer-based, lithium-based cell chemistries and battery technologies to address the next generation of aerospace applications and mission needs. The ultimate objective of this development program, which was referred to as the Polymer Energy Rechargeable System (PERS), was to establish a world-class technology capability and U.S. leadership in polymer-based battery technology for aerospace applications. Programmatically, the PERS initiative exploited both interagency collaborations to address common technology and engineering issues and the active participation of academia and private industry. The initial program phases focused on R&D activities to address the critical technical issues and challenges at the cell level. Out of a total of 38 proposals received in response to a NASA Research Announcement (NRA) solicitation, 18 proposals (13 contracts and 5 grants) were selected for initial award to address these technical challenges. Brief summaries of technical approaches, results and accomplishments of the PERS Program development efforts are presented. With Agency support provided through FY 2004, the PERS Program efforts were concluded in 2005, as internal reorganizations and funding cuts resulted in shifting programmatic priorities within NASA. Technically, the PERS Program participants explored, to various degrees over the lifetime of the formal program, a variety of conceptual approaches for developing and demonstrating performance of a viable advanced solid polymer electrolyte possessing the desired attributes, as well as several participants addressing all components of an integrated cell configuration. Programmatically, the NASA PERS Program was very successful, even though the very challenging technical goals for achieving a viable solid polymer electrolyte material or the overall envisioned long-term, program objectives were not met due to funding reductions. The NASA PERS Program provided research opportunities and generated and disseminated a wealth of new scientific knowledge and technical competencies within the polymer electrolyte area.
Willows, Thomas; Dizdar, Nil; Nyholm, Dag; Widner, Håkan; Grenholm, Peter; Schmiauke, Ursula; Urbom, Anna; Groth, Kristina; Larsson, Jörgen; Permert, Johan; Kjellander, Susanna
2017-01-01
Levodopa-carbidopa intestinal gel (LCIG; Duodopa®) is used for continuous infusion in advanced Parkinson's disease. To achieve optimal effect, the LCIG dose is individually titrated, traditionally conducted during hospitalization in Sweden. However, dose adjustment depends on surrounding conditions, physical activity, and emotional stress, which is why titration at home could be beneficial. Telemedicine (TM) using a video communication system offers alternative titration procedures, allowing LCIG initiation at home. Study objectives were to show the feasibility of TM for LCIG home titration, evaluate resource use, and assess patient, neurologist, and nurse satisfaction. Four clinics enrolled 15 patients to observe efficiency and feasibility of TM-based monitoring. Patient median (range) age was 67 (52-73) years and time since diagnosis was 10 (7-23) years. Median time between LCIG initiation and end of TM-assisted titration was 2.8 (2.0-13.8) days. Median time required for home titration by neurologists, nurses, and patients was (hours:minutes) 1 : 14 (0 : 29-1 : 52), 5 : 49 (2 : 46-10 : 3), and 8 : 53 (4 : 11-14 : 11), respectively. Neurologists and nurses considered this to be less time than required for hospital titration. TM allowed patients 92% free time from start to end of titration. Technical problems associated with TM contacts were rare, mostly related to digital link, and quickly resolved. Patients, neurologists, and nurses were satisfied using TM. No serious adverse events were reported; there was one device complaint (tube occlusion). In this study, TM-assisted LCIG titration at home was resource-efficient, technically feasible, well-accepted and was deemed satisfactory by patients, neurologists, and nurses.
Embedded Thermal Control for Spacecraft Subsystems Miniaturization
NASA Technical Reports Server (NTRS)
Didion, Jeffrey R.
2014-01-01
Optimization of spacecraft size, weight and power (SWaP) resources is an explicit technical priority at Goddard Space Flight Center. Embedded Thermal Control Subsystems are a promising technology with many cross cutting NSAA, DoD and commercial applications: 1.) CubeSatSmallSat spacecraft architecture, 2.) high performance computing, 3.) On-board spacecraft electronics, 4.) Power electronics and RF arrays. The Embedded Thermal Control Subsystem technology development efforts focus on component, board and enclosure level devices that will ultimately include intelligent capabilities. The presentation will discuss electric, capillary and hybrid based hardware research and development efforts at Goddard Space Flight Center. The Embedded Thermal Control Subsystem development program consists of interrelated sub-initiatives, e.g., chip component level thermal control devices, self-sensing thermal management, advanced manufactured structures. This presentation includes technical status and progress on each of these investigations. Future sub-initiatives, technical milestones and program goals will be presented.
Towards Development of Robotic Aid for Rehabilitation of Locomotion-Impaired Subjects
NASA Technical Reports Server (NTRS)
Bejczy, Antal K.
2000-01-01
Manual assistance of therapists to help movement of legs of spinal cord injured (SCI) subjects during stepping on a treadmill for locomotion rehabilitation has severe economic and technical limitations. Scientists at the Department of Physiological Science at the University of California Los Angeles (UCLA) and roboticists at the Jet Propulsion Laboratory (JPL) initiated a joint effort to develop a robotic mechanism capable of performing controlled motions equivalent to the arm and hand motions of therapists assisting the stepping of locomotion impaired subjects on a treadmill, while the subjects' body weight is partially supported by an overhead harness. A first necessary technical step towards this development is to measure and understand the kinematics and dynamics of the therapists' arm and hand motions as they are reflected on the subjects' leg movement. This paper describes an initial measurement system developed for this purpose together with the related measurement results, and outlines the planned future technical work.
Tansley, P; Kakar, S; Withey, S; Butler, P
2007-01-01
INTRODUCTION Despite awareness of the limitations of current selection and competency assessments, there is little consensus and alternatives have not been readily accepted. Essential surgical skills include visuospatial and technical ability. The aim of this study was to survey current methods of higher surgical trainee selection and assessment. We suggest ways to improve the process. MATERIALS AND METHODS Nine surgical training programmes in the London deanery were surveyed through questionnaires to programme directors, existing trainees and examination of deanery publications. RESULTS Testing of visuospatial and technical ability was piloted at selection only in a single general surgical department. Practical skills were assessed in 3/9 (33%) specialties (ENT, plastic and general surgery). Once selected, no specialty tested visuospatial and technical ability. Practical skills were tested in only 1/9 (11%) specialties (plastic surgery). The remaining 8/9 (89%) were ‘assessed’ by interview. CONCLUSIONS Lack of visuospatial and technical ability assessment was identified at selection and during higher surgical training. Airlines have long recognised early identification of these qualities as critical for efficient training. There is a need for more objective methods in this area prior to selection as time to assess surgical trainees during long apprenticeships is no longer available. We advocate a suitably validated competency-based model during and at completion of training. PMID:18201473
Technical and economic assessments commercial success for IGCC technology in China
DOE Office of Scientific and Technical Information (OSTI.GOV)
Xiong, T.
1998-07-01
The experiences gained from several Integrated Gasification Combined Cycle (IGCC) demonstration plants operating in the US and Europe facilitate commercial success of this advanced coal-based power generation technology. However, commercialization of coal-based IGCC technology in the West, particularly in the US, is restricted due to the low price of natural gas. On the contrary, in China--the largest coal producer and consumer in the world--a lack of natural gas supply, strong demand for air pollution control and relatively low costs of manufacturing and construction provide tremendous opportunities for IGCC applications. The first Chinese IGCC demonstration project was initiated in 1994, andmore » other potential IGCC projects are in planning. IGCC applications in re-powering, fuel switching and multi-generation also show a great market potential in China. However, questions for IGCC development in China remain; where are realistic opportunities for IGCC projects and how can these opportunities be converted into commercial success? The answers to these questions should focus on the Chinese market needs and emphasize economic benefits, not just clean, or power. High price of imported equipment, high financing costs, and the technical risk of first-of-a-kind installation barricade IGCC development in China. This paper presents preliminary technical and economic assessments for four typical IGCC applications in the Chinese marketplace: central power station, fuel switching, re-powering, and multi-generation. The major factors affecting project economics--such as plant cost, financing, prices of fuel and electricity and operating capacity factor--are analyzed. The results indicate that well-proven technology for versatile applications, preferred financing, reduction of the plant cost, environmental superiority and appropriate project structure are the key for commercial success of IGCC in China.« less
Dhir, Vinay; Itoi, Takao; Pausawasdi, Nonthalee; Khashab, Mouen A; Perez-Miranda, Manuel; Sun, Siyu; Park, Do Hyun; Iwashita, Takuji; Teoh, Anthony Y B; Maydeo, Amit P; Ho, Khek Yu
2017-11-01
EUS-guided biliary drainage (EUS-BD) and rendezvous (EUS-RV) are acceptable rescue options for patients with failed endoscopic retrograde cholangiopancreatography (ERCP). However, there are limited training opportunities at most centers owing to low case volumes. The existing models do not replicate the difficulties encountered during EUS-BD. We aimed to develop and validate a model for stepwise learning of EUS-BD and EUS-RV, which replicates the actual EUS-BD procedures. A hybrid model was created utilizing pig esophagus and stomach, with a synthetic duodenum and biliary system. The model was objectively assessed on a grade of 1 - 4 by two experts. Twenty-eight trainees were given initial training with didactic lectures and live procedures. This was followed by hands-on training in EUS-BD and EUS-RV on the hybrid model. Trainees were assessed for objective criteria of technical difficulties. Both the experts graded the model as very good or above for all parameters. All trainees could complete the requisite steps of EUS-BD and EUS-RV in a mean time of 11 minutes (8 - 18 minutes). Thirty-six technical difficulties were noted during the training (wrong scope position, 13; incorrect duct puncture, 12; guidewire related problems, 11). Technical difficulties peaked for EUS-RV, followed by hepaticogastrostomy (HGS) and choledochoduodenostomy (CDS) (20, 9, and 7, P = 0.001). At 10 days follow-up, nine of 28 trainees had successfully performed three EUS-RV and seven EUS-BD procedures independently. The Mumbai EUS II hybrid model replicates situations encountered during EUS-RV and EUS-BD. Stepwise mentoring improves the chances of success in EUS-RV and EUS-BD procedures.
Operational evaluation of initial data link air traffic control services, Vol. 1
DOT National Transportation Integrated Search
1990-02-01
This report details the results of an operational evaluation of Initial Data Link Air Traffic Control (ATC) Services. The Operational Evaluation was conducted at the Federal Aviation Administration (FAA) Technical Center utilizing the Data Link test ...
Operational evaluation of initial data link air traffic control services, Vol. 2 - Appendixes
DOT National Transportation Integrated Search
1990-02-01
This report details the results of an operational evaluation of Initial Data : LInk Air Traffic Control (ATC) Services. The Operational Evaluation was : conducted at the Federal Aviation Administration (FAA)Technical Center utilizing : the Data Link ...
78 FR 64253 - NASA Asteroid Initiative Idea Synthesis Workshop
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice: 13-124] NASA Asteroid Initiative Idea.... SUMMARY: The National Aeronautics and Space Administration announces that the agency will resume the NASA... INFORMATION CONTACT: Michele Gates, Senior Technical Advisor, NASA Human Exploration and Operations Mission...
In this technical support document (TSD) EPA describes the air quality modeling performed to support the 2015 ozone National Ambient Air Quality Standards (NAAQS) preliminary interstate transport assessment Notice of Data Availability (NODA).
Ethical and Professional Issues in Career Assessment on the Internet.
ERIC Educational Resources Information Center
Barak, Azy
2003-01-01
Concerns about Internet-based career assessments include the following: users' technical skill level, lack of screening, psychological factors, cultural bias, unprotected results, technical failures, lack of standardization, digital divide, interpretation problems, outdated tests, copyright violations, administrator qualifications, and hidden…
The safety net medical home initiative: transforming care for vulnerable populations.
Sugarman, Jonathan R; Phillips, Kathryn E; Wagner, Edward H; Coleman, Katie; Abrams, Melinda K
2014-11-01
Despite findings that medical homes may reduce or eliminate health care disparities among underserved and minority populations, most previous medical home pilot and demonstration projects have focused on health care delivery systems serving commercially insured patients and Medicare beneficiaries. To develop a replicable approach to support medical home transformation among diverse practices serving vulnerable and underserved populations. Facilitated by a national program team, convening organizations in 5 states provided coaching and learning community support to safety net practices over a 4-year period. To guide transformation, we developed a framework of change concepts aligned with supporting tools including implementation guides, activity checklists, and measurement instruments. Sixty-five health centers, homeless clinics, private practices, residency training centers, and other safety net practices in Colorado, Idaho, Massachusetts, Oregon, and Pennsylvania. We evaluated implementation of the change concepts using the Patient-Centered Medical Home-Assessment, and conducted a survey of participating practices to assess perceptions of the impact of the technical assistance. All practices implemented key features of the medical home model, and nearly half (47.6%) implemented the 33 identified key changes to a substantial degree as evidenced by level A Patient-Centered Medical Home-Assessment scores. Two thirds of practices that achieved substantial implementation did so only after participating in the initiative for >2 years. By the end of the initiative, 83.1% of sites achieved external recognition as medical homes. Despite resource constraints and high-need populations, safety net clinics made considerable progress toward medical home implementation when provided robust, multimodal support over a 4-year period.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... Transformation Initiative (OneCPD TA and Core Curricula) AGENCY: Office of the Assistant Secretary for Community... Transformation Initiative (OneCPD TA and Core Curricula) program. This announcement contains the names of the... Capacity Building under the Transformation Initiative (OneCPD TA and Core Curricula) was designed to...
The Status of Large-Scale Assessment in the Pacific Region. REL Technical Brief. REL 2008-No. 003
ERIC Educational Resources Information Center
Ryan, Jennifer; Keir, Scott
2008-01-01
This technical brief describes the large-scale assessment measures and practices used in the jurisdictions served by the Pacific Regional Educational Laboratory. The need for effective large-scale assessment was identified as a major priority for improving student achievement in the Pacific Region jurisdictions: American Samoa, Guam, Hawaii, the…
The Future of Career Technical Education (CTE) Assessment. Executive Summary
ERIC Educational Resources Information Center
Council of Chief State School Officers, 2011
2011-01-01
On behalf of the states that participated in the 2009-10 State Collaborative on Assessment and Student Standards (SCASS) on Technical Skills Assessment, this paper addresses two significant issues facing the nation: ensuring that more students are both college and career ready and addressing the need for better and more quality data to evaluate…
Selecting a software development methodology. [of digital flight control systems
NASA Technical Reports Server (NTRS)
Jones, R. E.
1981-01-01
The state of the art analytical techniques for the development and verification of digital flight control software is studied and a practical designer oriented development and verification methodology is produced. The effectiveness of the analytic techniques chosen for the development and verification methodology are assessed both technically and financially. Technical assessments analyze the error preventing and detecting capabilities of the chosen technique in all of the pertinent software development phases. Financial assessments describe the cost impact of using the techniques, specifically, the cost of implementing and applying the techniques as well as the relizable cost savings. Both the technical and financial assessment are quantitative where possible. In the case of techniques which cannot be quantitatively assessed, qualitative judgements are expressed about the effectiveness and cost of the techniques. The reasons why quantitative assessments are not possible will be documented.
Technical Interchange Meeting Guidelines Breakout
NASA Technical Reports Server (NTRS)
Fong, Rob
2002-01-01
Along with concept developers, the Systems Evaluation and Assessment (SEA) sub-element of VAMS will develop those scenarios and metrics required for testing the new concepts that reside within the System-Level Integrated Concepts (SLIC) sub-element in the VAMS project. These concepts will come from the NRA process, space act agreements, a university group, and other NASA researchers. The emphasis of those concepts is to increase capacity while at least maintaining the current safety level. The concept providers will initially develop their own scenarios and metrics for self-evaluation. In about a year, the SEA sub-element will become responsible for conducting initial evaluations of the concepts using a common scenario and metric set. This set may derive many components from the scenarios and metrics used by the concept providers. Ultimately, the common scenario\\metric set will be used to help determine the most feasible and beneficial concepts. A set of 15 questions and issues, discussed below, pertaining to the scenario and metric set, and its use for assessing concepts, was submitted by the SEA sub-element for consideration during the breakout session. The questions were divided among the three breakout groups. Each breakout group deliberated on its set of questions and provided a report on its discussion.
Technosocial Modeling of IED Threat Scenarios and Attacks
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitney, Paul D.; Brothers, Alan J.; Coles, Garill A.
2009-03-23
This paper describes an approach for integrating sociological and technical models to develop more complete threat assessment. Current approaches to analyzing and addressing threats tend to focus on the technical factors. This paper addresses development of predictive models that encompass behavioral as well as these technical factors. Using improvised explosive device (IED) attacks as motivation, this model supports identification of intervention activities 'left of boom' as well as prioritizing attack modalities. We show how Bayes nets integrate social factors associated with IED attacks into general threat model containing technical and organizational steps from planning through obtaining the IED to initiationmore » of the attack. The social models are computationally-based representations of relevant social science literature that describes human decision making and physical factors. When combined with technical models, the resulting model provides improved knowledge integration into threat assessment for monitoring. This paper discusses the construction of IED threat scenarios, integration of diverse factors into an analytical framework for threat assessment, indicator identification for future threats, and future research directions.« less
Podolsky, Dale J; Fisher, David M; Wong Riff, Karen W; Szasz, Peter; Looi, Thomas; Drake, James M; Forrest, Christopher R
2018-06-01
This study assessed technical performance in cleft palate repair using a newly developed assessment tool and high-fidelity cleft palate simulator through a longitudinal simulation training exercise. Three residents performed five and one resident performed nine consecutive endoscopically recorded cleft palate repairs using a cleft palate simulator. Two fellows in pediatric plastic surgery and two expert cleft surgeons also performed recorded simulated repairs. The Cleft Palate Objective Structured Assessment of Technical Skill (CLOSATS) and end-product scales were developed to assess performance. Two blinded cleft surgeons assessed the recordings and the final repairs using the CLOSATS, end-product scale, and a previously developed global rating scale. The average procedure-specific (CLOSATS), global rating, and end-product scores increased logarithmically after each successive simulation session for the residents. Reliability of the CLOSATS (average item intraclass correlation coefficient (ICC), 0.85 ± 0.093) and global ratings (average item ICC, 0.91 ± 0.02) among the raters was high. Reliability of the end-product assessments was lower (average item ICC, 0.66 ± 0.15). Standard setting linear regression using an overall cutoff score of 7 of 10 corresponded to a pass score for the CLOSATS and the global score of 44 (maximum, 60) and 23 (maximum, 30), respectively. Using logarithmic best-fit curves, 6.3 simulation sessions are required to reach the minimum standard. A high-fidelity cleft palate simulator has been developed that improves technical performance in cleft palate repair. The simulator and technical assessment scores can be used to determine performance before operating on patients.
The Application and Evaluation of PLATO IV in AF Technical Training.
ERIC Educational Resources Information Center
Mockovak, William P.; And Others
The Air Force has been plagued with the rising cost of technical training and has increasingly turned to computer-assisted instruction (CAI) for better cost effectiveness. Toward this aim a trial of PLATO IV, a CAI system utilizing a graphic display and centered at the University of Illinois, was initiated at the Chanute and Sheppard training…
ERIC Educational Resources Information Center
Mathias, Elizabeth A.
In 1993, a study was conducted to investigate the responses of associate degree programs in manufacturing and related technical programs to current technical education initiatives. The study focused on the relationships of associate degree programs to secondary and postsecondary education and industry, curricular trends, familiarity with the…
Skiing, Cheese Fondue and Swiss Watches: Analogical Discourse in Vocational Training Interactions
ERIC Educational Resources Information Center
Filliettaz, Laurent; de Saint-Georges, Ingrid; Duc, Barbara
2010-01-01
When trainers or teachers in the field of initial vocational education explain abstract notions, refer to technical objects or emphasize the specificities of technical skills, they often call forth concepts and practices different from those that are directly salient in the training situations in which they engage. The aim of this paper is to…
Advancing Next-Generation Energy in Indian Country (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2012-08-01
This fact sheet provides information on Tribes in the lower 48 states selected to receive assistance from the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
Advancing Next-Generation Energy in Indian Country (Fact Sheet)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2012-08-01
This fact sheet provides information on the Alaska Native governments selected to receive assistance from the Strategic Technical Assistance Response Team (START) Program, a U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) initiative to provide technical expertise to support the development of next-generation energy projects in Indian Country.
"They're Not Keeping a Journal of Feelings": Literacy Initiatives and Career and Technical Education
ERIC Educational Resources Information Center
Kohnen, Angela M.
2015-01-01
Career and Technical Education (CTE) centers offer an opportunity for students to engage in authentic reading and writing activities. In many states, "embedding" English and math credits (i.e., allowing students to earn traditional core subject credits in the context of their CTE programs) has become a popular trend. This article reports…
A DDC Bibliography on Cost/Benefits of Technical Information Services and Technology Transfer.
ERIC Educational Resources Information Center
Defense Documentation Center, Alexandria, VA.
This bibliography is a compilation of literature existing in both the government and public sectors and concerning Cost/Benefits of Technical information Services and Technology Transfer. Not only was the cost-benefit to the user reflected, but consideration was given to the initial cost of information collections, the cost of processing the…