NASA Astrophysics Data System (ADS)
Yoshino, R.; Kondoh, T.; Neyatani, Y.; Itami, K.; Kawano, Y.; Isei, N.
1997-02-01
A killer pellet is an impurity pellet that is injected into a tokamak plasma in order to terminate a discharge without causing serious damage to the tokamak machine. In JT-60U neon ice pellets have been injected into OH and NB heated plasmas and fast plasma shutdowns have been demonstrated without large vertical displacement. The heat pulse on the divertor plate has been greatly reduced by killer pellet injection (KPI), but a low-power heat flux tail with a long time duration is observed. The total energy on the divertor plate increases with longer heat flux tail, so it has been reduced by shortening the tail. Runaway electron (RE) generation has been observed just after KPI and/or in the later phase of the plasma current quench. However, RE generation has been avoided when large magnetic perturbations are excited. These experimental results clearly show that KPI is a credible fast shutdown method avoiding large vertical displacement, reducing heat flux on the divertor plate, and avoiding (or minimizing) RE generation.
Experiments in DIII-D Toward Achieving Rapid Shutdown with Runaway Electron Suppression
NASA Astrophysics Data System (ADS)
Hollmann, E. M.
2009-11-01
For safe discharge shutdown in future large tokamaks in the event of an unavoidable disruption, it is important to develop rapid (˜ several ms)shutdown methods to avoid large runaway electron currents, which pose a serious threat to plasma facing components. Prevention of runaway current formation has been proposed by either increasing electron-electron collisionality with massive particle injection, or magnetically by using externally applied non-axisymmetric fields to increase radial diffusive losses of a runaway seed population. Experiments studying both approaches have been pursued in the DIII-D tokamak. For collisional suppression, three different rapid shutdown methods are being investigated: massive gas injection, massive shattered cryogenic pellet injection, and polystyrene shell pellet injection. First-of-kind demonstrations of fast shutdowns were produced by 3000 Torr-l (0.8-g) shattered D2 pellets and large, 10-mm diameter, 0.3-g polystyrene shell pellets filled with boron powder. The application of external magnetic perturbations shows promising preliminary results in suppressing seed runaway electrons, although lack of repeatability in the runaway seed term made these results challenging to interpret. Experiments have been performed to help understand how runaways form and are transported during rapid shutdown. These experiments confirm that the commonly used 0D loop voltage + Dreicer evaporation picture of runaway seed formation is not applicable here, with relativistic E > 0.5,MeV electrons forming before any external loop voltage appears. Present applications of 0D, 1D, and 2D models to the rapid shutdown and runaway confinement experiments, as well as preliminary extrapolations to ITER, will be discussed.
Plasma shut-down with fast impurity puff on ASDEX Upgrade
NASA Astrophysics Data System (ADS)
Pautasso, G.; Fuchs, C. J.; Gruber, O.; Maggi, C. F.; Maraschek, M.; Pütterich, T.; Rohde, V.; Wittmann, C.; Wolfrum, E.; Cierpka, P.; Beck, M.; ASDEX Upgrade Team
2007-08-01
The massive injection of impurity gas into a plasma has been proved to reduce forces and localized thermal loads caused by disruptions in tokamaks. This mitigation system is routinely used on ASDEX Upgrade to shut down plasmas with a locked mode. The plasma response to impurity injection and the mechanism of reduction of the mechanical forces is discussed in the paper.
Application of a Self-Actuating Shutdown System (SASS) to a Gas-Cooled Fast Reactor (GCFR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Germer, J.H.; Peterson, L.F.; Kluck, A.L.
1980-09-01
The application of a SASS (Self-Actuated Shutdown System) to a GCFR (Gas-Cooled Fast Reactor) is compared with similar systems designed for an LMFBR (Liquid Metal Fast Breeder Reactor). A comparison of three basic SASS concepts is given: hydrostatic holdup, fluidic control, and magnetic holdup.
Gas-injection-start and shutdown characteristics of a 2-kilowatt to 15-kilowatt Brayton power system
NASA Technical Reports Server (NTRS)
Cantoni, D. A.
1972-01-01
Two methods of starting the Brayton power system have been considered: (1) using the alternator as a motor to spin the Brayton rotating unit (BRU), and (2) spinning the BRU by forced gas injection. The first method requires the use of an auxiliary electrical power source. An alternating voltage is applied to the terminals of the alternator to drive it as an induction motor. Only gas-injection starts are discussed in this report. The gas-injection starting method requires high-pressure gas storage and valves to route the gas flow to provide correct BRU rotation. An analog computer simulation was used to size hardware and to determine safe start and shutdown procedures. The simulation was also used to define the range of conditions for successful startups. Experimental data were also obtained under various test conditions. These data verify the validity of the start and shutdown procedures.
Modeling of rapid shutdown in the DIII-D tokamak by core deposition of high-Z material
Izzo, Valerie A.; Parks, Paul B.
2017-06-22
MHD modeling of shell-pellet injection for disruption mitigation is carried out under the assumption of idealized delivery of the radiating payload to the core, neglecting the physics of shell ablation. The shell pellet method is designed to produce an inside-out thermal quench in which core thermal heat is radiated while outer flux surfaces remain intact, protecting the divertor from large conducted heat loads. In the simulation, good outer surfaces remain until the thermal quench is nearly complete, and a high radiated energy fraction is achieved. As a result, when the outermost surfaces are destroyed, runaway electron test orbits indicate thatmore » the rate of runaway electron loss is very fast compared with prior massive gas injection simulations, which is attributed to the very different current profile evolution that occurs with central cooling.« less
The ITER disruption mitigation trigger: developing its preliminary design
NASA Astrophysics Data System (ADS)
Pautasso, G.; de Vries, P. C.; Humphreys, D.; Lehnen, M.; Rapson, C.; Raupp, G.; Snipes, J. A.; Treutterer, W.; Vergara-Fernandez, A.; Zabeo, L.
2018-03-01
A concept for the generation of the trigger for the ITER disruption mitigation system is described in this paper. The issuing of the trigger will be the result of a complex decision process, taken by the plasma control system, or by the central interlock system, determining that the plasma is unavoidably going to disrupt—or has disrupted—and that a fast mitigated shut-down is required. Given the redundancy of the mitigation system, the plasma control system must also formulate an injection scheme and specify when and how the injectors of the mitigation system should be activated. The parameters and the conceptual algorithms required for the configuration and generation of the trigger are discussed.
A CFD Model for High Pressure Liquid Poison Injection for CANDU-6 Shutdown System No. 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bo Wook Rhee; Chang Jun Jeong; Hye Jeong Yun
2002-07-01
In CANDU reactor one of the two reactor shutdown systems is the liquid poison injection system which injects the highly pressurized liquid neutron poison into the moderator tank via small holes on the nozzle pipes. To ensure the safe shutdown of a reactor it is necessary for the poison curtains generated by jets provide quick, and enough negative reactivity to the reactor during the early stage of the accident. In order to produce the neutron cross section necessary to perform this work, the poison concentration distribution during the transient is necessary. In this study, a set of models for analyzingmore » the transient poison concentration induced by this high pressure poison injection jet activated upon the reactor trip in a CANDU-6 reactor moderator tank has been developed and used to generate the poison concentration distribution of the poison curtains induced by the high pressure jets injected into the vacant region between the pressure tube banks. The poison injection rate through the jet holes drilled on the nozzle pipes is obtained by a 1-D transient hydrodynamic code called, ALITRIG, and this injection rate is used to provide the inlet boundary condition to a 3-D CFD model of the moderator tank based on CFX4.3, a CFD code, to simulate the formation of the poison jet curtain inside the moderator tank. For validation, an attempt was made to validate this model against a poison injection experiment performed at BARC. As conclusion this set of models is judged to be appropriate. (authors)« less
System Study: Residual Heat Removal 1998-2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schroeder, John Alton
2015-12-01
This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and post-trip shutdown-cooling) at 104 U.S. commercial nuclear power plants. Demand, run hours, and failure data from fiscal year 1998 through 2014 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Consolidated Events Database (ICES). The unreliability results are trended for the most recent 10 year period, while yearly estimates for system unreliability are provided for the entire active period. No statistically significant increasing trends were identified in themore » RHR results. A highly statistically significant decreasing trend was observed for the RHR injection mode start-only unreliability. Statistically significant decreasing trends were observed for RHR shutdown cooling mode start-only unreliability and RHR shutdown cooling model 24-hour unreliability.« less
Analysis of activation and shutdown contact dose rate for EAST neutral beam port
NASA Astrophysics Data System (ADS)
Chen, Yuqing; Wang, Ji; Zhong, Guoqiang; Li, Jun; Wang, Jinfang; Xie, Yahong; Wu, Bin; Hu, Chundong
2017-12-01
For the safe operation and maintenance of neutral beam injector (NBI), specific activity and shutdown contact dose rate of the sample material SS316 are estimated around the experimental advanced superconducting tokamak (EAST) neutral beam port. Firstly, the neutron emission intensity is calculated by TRANSP code while the neutral beam is co-injected to EAST. Secondly, the neutron activation and shutdown contact dose rates for the neutral beam sample materials SS316 are derived by the Monte Carlo code MCNP and the inventory code FISPACT-2007. The simulations indicate that the primary radioactive nuclides of SS316 are 58Co and 54Mn. The peak contact dose rate is 8.52 × 10-6 Sv/h after EAST shutdown one second. That is under the International Thermonuclear Experimental Reactor (ITER) design values 1 × 10-5 Sv/h.
The radiation asymmetry in MGI rapid shutdown on J-TEXT tokamak
NASA Astrophysics Data System (ADS)
Tong, Ruihai; Chen, Zhongyong; Huang, Duwei; Cheng, Zhifeng; Zhang, Xiaolong; Zhuang, Ge; J-TEXT Team
2017-10-01
Disruptions, the sudden termination of tokamak fusion plasmas by instabilities, have the potential to cause severe material wall damage to large tokamaks like ITER. The mitigation of disruption damage is an essential part of any fusion reactor system. Massive gas injection (MGI) rapid shutdown is a technique in which large amounts of noble gas are injected into the plasma in order to safely radiate the plasma energy evenly over the entire plasma-facing first wall. However, the radiated energy during the thermal quench (TQ) in massive gas injection (MGI) induced disruptions is found toroidal asymmetric, and the degrees of asymmetry correlate with the gas penetration and MGI induced magnetohydrodynamics (MHD) activities. A toroidal and poloidal array of ultraviolet photodiodes (AXUV) has been developed to investigate the radiation asymmetry on J-TEXT tokamak. Together with the upgraded mirnov probe arrays, the relation between MGI triggered MHD activities with radiation asymmetry is studied.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Josephson, J.; Sowa, E.S.
1977-04-01
The design and testing of a simple and reliable Self-Actuated Shutdown System (SASS) for the protection of Liquid Metal Fast Breeder Reactors (LMFBRs) is described. A ferromagnetic Curie temperature permanent magnet holding device has been selected for the design of the Self-Actuated Shutdown System in order to enhance the safety of liquid metal cooled fast reactors (LMFBRs). The self-actuated, self-contained device operates such that accident conditions, resulting in increased coolant temperature or neutron flux reduce the magnetic holding force suspending a neutron absorber above the core by raising the temperature of the trigger mechanism above the Curie point. Neutron absorbermore » material is then inserted into the core, under gravity, terminating the accident. Two possible design variations of the selected concept are presented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Uto, N.; Niwa, H.; Ieda, Y.
1996-08-01
Passive prevention of core disruptive accidents (CDAs) is desired in terms of enhancement of safety for future fast breeder reactors. In addition, mitigation of CDA`s consequences should be required because mitigation measures have a potential of applying to all accidents, while prevention measures are prepared for specific accident initiators. In this paper, the Intra-Subassembly-equipped Self-Actuated Shutdown System (IS-SASS) , which is considered effective on passive prevention and mitigation of CDAs, is described. The IS-SASS is introduced in a fuel subassembly and consists of absorber materials at the top of the active core and an inner duct through which molten fuelmore » can be excluded out of the core. The determination of the appropriate number of the IS-SASS units, their arrangement in the core and their suitable structure are found to be suited to prevention and mitigation of CDAs for liquid metal-cooled large fast breeder reactors.« less
Control rod drive for reactor shutdown
McKeehan, Ernest R.; Shawver, Bruce M.; Schiro, Donald J.; Taft, William E.
1976-01-20
A means for rapidly shutting down or scramming a nuclear reactor, such as a liquid metal-cooled fast breeder reactor, and serves as a backup to the primary shutdown system. The control rod drive consists basically of an in-core assembly, a drive shaft and seal assembly, and a control drive mechanism. The control rod is driven into the core region of the reactor by gravity and hydraulic pressure forces supplied by the reactor coolant, thus assuring that common mode failures will not interfere with or prohibit scramming the reactor when necessary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gonzalez Gonzalez, R.; Petruzzi, A.; D'Auria, F.
2012-07-01
Atucha-2 is a Siemens-designed PHWR reactor under construction in the Republic of Argentina. Its geometrical complexity and (e.g., oblique Control Rods, Positive Void coefficient) required a developed and validated complex three dimensional (3D) neutron kinetics (NK) coupled thermal hydraulic (TH) model. Reactor shut-down is obtained by oblique CRs and, during accidental conditions, by an emergency shut-down system (JDJ) injecting a highly concentrated boron solution (boron clouds) in the moderator tank, the boron clouds reconstruction is obtained using a CFD (CFX) code calculation. A complete LBLOCA calculation implies the application of the RELAP5-3D{sup C} system code. Within the framework of themore » third Agreement 'NA-SA - Univ. of Pisa' a new RELAP5-3D control system for the boron injection system was developed and implemented in the validated coupled RELAP5-3D/NESTLE model of the Atucha 2 NPP. The aim of this activity is to find out the limiting case (maximum break area size) for the Peak Cladding Temperature for LOCAs under fixed boundary conditions. (authors)« less
NASA Astrophysics Data System (ADS)
Konstantinov, M. S.; Nguyen, D. N.
2016-12-01
The paper analyzes the possibility for countering ballistic perturbations of the interplanetary transfer trajectory of the spacecraft with electric propulsion (EP) associated with the temporary impossibility of the normal use of the EP in phases of the heliocentric transfer. The main result of the present study is the method for the determination of a new nominal trajectory, at any point of which the allowed duration of the emergency shutdown of electric propulsion is large enough. The numerical analysis is given for one of the possible scenarios of spacecraft injection into the operational heliocentric orbit for solar research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moon, Seoksu; Huang, Weidi; Li, Zhilong
The needle shutdown of fuel injectors leads to an undesired fuel dribble that forms unburned hydrocarbons and decreases the engine thermal efficiency in modern engines. Understanding of the fuel dribbling process is of great importance to establish its minimization strategy for optimal use of conventional fuels. However, the detailed needle dynamics and in- and near-nozzle flow characteristics governing the fuel dribble process have not been thoroughly understood. In this study, the needle dynamics, in- and near-nozzle flow characteristics and fuel dribble of a mini-sac type three-hole diesel injector were investigated using a highspeed X-ray phase-contrast imaging technique at different injectionmore » pressures. The results showed that an increase in injection pressure increased the flow evacuation velocity at the needle close that induced a more intense fuel cavitation and air ingestion inside the nozzle. The fuel dribbling process showed a high shot-toshot deviation. A statistical analysis of 50-shot results exhibited two breakup modes of fuel dribble determined by the flow evacuation velocity at the needle close and presence of air ingestion. In the first mode, the fast breakup with a short residence time of fuel dribble occurred. Meanwhile, the dripping of undisturbed liquid column with a long residence time of fuel dribble occurred in the second mode. An increase in injection pressure increased the population of the first mode due to more intense air ingestion that primarily caused by an increase in needle closing speed other than an increase in peak injection velocity. Based on the results, the formation mechanism and control strategies of the fuel dribble from modern diesel injectors were discussed.« less
Sodium storage and injection system
NASA Technical Reports Server (NTRS)
Keeton, A. R. (Inventor)
1979-01-01
A sodium storage and injection system for delivering atomized liquid sodium to a chemical reactor employed in the production of solar grade silicon is disclosed. The system is adapted to accommodate start-up, shut-down, normal and emergency operations, and is characterized by (1) a jacketed injection nozzle adapted to atomize liquefied sodium and (2) a supply circuit connected to the nozzle for delivering the liquefied sodium. The supply circuit is comprised of a plurality of replaceable sodium containment vessels, a pump interposed between the vessels and the nozzle, and a pressurizing circuit including a source of inert gas connected with the vessels for maintaining the sodium under pressure.
Network Flow Simulation of Fluid Transients in Rocket Propulsion Systems
NASA Technical Reports Server (NTRS)
Bandyopadhyay, Alak; Hamill, Brian; Ramachandran, Narayanan; Majumdar, Alok
2011-01-01
Fluid transients, also known as water hammer, can have a significant impact on the design and operation of both spacecraft and launch vehicle propulsion systems. These transients often occur at system activation and shutdown. The pressure rise due to sudden opening and closing of valves of propulsion feed lines can cause serious damage during activation and shutdown of propulsion systems. During activation (valve opening) and shutdown (valve closing), pressure surges must be predicted accurately to ensure structural integrity of the propulsion system fluid network. In the current work, a network flow simulation software (Generalized Fluid System Simulation Program) based on Finite Volume Method has been used to predict the pressure surges in the feed line due to both valve closing and valve opening using two separate geometrical configurations. The valve opening pressure surge results are compared with experimental data available in the literature and the numerical results compared very well within reasonable accuracy (< 5%) for a wide range of inlet-to-initial pressure ratios. A Fast Fourier Transform is preformed on the pressure oscillations to predict the various modal frequencies of the pressure wave. The shutdown problem, i.e. valve closing problem, the simulation results are compared with the results of Method of Characteristics. Most rocket engines experience a longitudinal acceleration, known as "pogo" during the later stage of engine burn. In the shutdown example problem, an accumulator has been used in the feed system to demonstrate the "pogo" mitigation effects in the feed system of propellant. The simulation results using GFSSP compared very well with the results of Method of Characteristics.
40 CFR Table 3 to Subpart Jjjjjj... - Operating Limits for Boilers With Emission Limits
Code of Federal Regulations, 2014 CFR
2014-07-01
... using . . . You must meet these operating limits except during periods of startup and shutdown . . . 1... the injection rate operating limit by 0.5). 5. Any other add-on air pollution control type. This... equal to 10 percent opacity (daily block average). 6. Fuel analysis Maintain the fuel type or fuel...
Provol, Steve J.; Russell, David B.; Isaksson, Matti J.
1994-01-01
A power plant having a system for converting coal to power in a gas turbine comprises a coal fed pressurized circulating bed for converting coal to pressurized gases, a gas turbine having a compressor for pressurizing air for the pressurized circulating bed and expander for receiving and expanding hot combustion gases for powering a generator, a first fast acting valve for controlling the pressurized air, a second fast acting valve means for controlling pressurized gas from the compressor to the expander.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Benoit, J. C.; Bourdot, P.; Eschbach, R.
2012-07-01
A Decay Heat (DH) experiment on the whole core of the French Sodium-Cooled Fast Reactor PHENIX has been conducted in May 2008. The measurements began an hour and a half after the shutdown of the reactor and lasted twelve days. It is one of the experiments used for the experimental validation of the depletion code DARWIN thereby confirming the excellent performance of the aforementioned code. Discrepancies between measured and calculated decay heat do not exceed 8%. (authors)
New Fast Beam Conditions Monitoring (BCM1F) system for CMS
NASA Astrophysics Data System (ADS)
Zagozdzinska, A. A.; Bell, A. J.; Dabrowski, A. E.; Hempel, M.; Henschel, H. M.; Karacheban, O.; Przyborowski, D.; Leonard, J. L.; Penno, M.; Pozniak, K. T.; Miraglia, M.; Lange, W.; Lohmann, W.; Ryjov, V.; Lokhovitskiy, A.; Stickland, D.; Walsh, R.
2016-01-01
The CMS Beam Radiation Instrumentation and Luminosity (BRIL) project is composed of several systems providing the experiment protection from adverse beam conditions while also measuring the online luminosity and beam background. Although the readout bandwidth of the Fast Beam Conditions Monitoring system (BCM1F—one of the faster monitoring systems of the CMS BRIL), was sufficient for the initial LHC conditions, the foreseen enhancement of the beams parameters after the LHC Long Shutdown-1 (LS1) imposed the upgrade of the system. This paper presents the new BCM1F, which is designed to provide real-time fast diagnosis of beam conditions and instantaneous luminosity with readout able to resolve the 25 ns bunch structure.
The 2014 Weld County, Colorado, Earthquakes: A developing case of induced seismicity?
NASA Astrophysics Data System (ADS)
Yeck, W. L.; Sheehan, A. F.; Weingarten, M.; Nakai, J.
2014-12-01
On June 1st 2014 (UTC), a M 3.2 earthquake occurred in Weld County, Colorado. Weld County is largely aseismic and this event was unexpected. There were no events in the ANSS Comprehensive Catalogue within 50 km of the earthquake. Weld County is the center of active oil and gas development, including many high-volume Class II wastewater injection wells. Injection wells have been linked to an increasing number of earthquakes throughout the US in recent years. Due to the lack of background seismicity in the area and the proximity of the earthquake to several injection wells, the University of Colorado requested seismometers from IRIS PASSCAL's Rapid Array Mobilization Program in order to study further seismicity. Seismic stations were deployed within 3 days of the June 1st event. We report on our ongoing findings from this deployment. To date, we have located 89 earthquakes and have detected over 600. These numbers continue to grow as we collect and analyze further data. Earthquake magnitudes remain small with only three earthquakes above M 2.0 recorded by our network, the largest of which was an M 2.6 earthquake on June 23rd 2014. Earthquakes locate in a small cluster (~2 km radius) centered near a high-volume injection well. This well operated at injection rates greater than 300,000 barrels/month since August 2013 and injects at a depth near the sediment-basement contact. Prior to our local deployment, the closest seismic station to the June 1st event was > 100 km away and therefore the evolution of seismicity prior the June 1st earthquake is poorly constrained. In order to better understand the temporal evolution of seismicity, we use match-filtering on data from these distant stations and find the earliest matching event on November 11th 2013. Due to the strong spatial and temporal correlation between these events and injection operations, we find it likely that these earthquakes are induced. In response to the ongoing seismicity near the well, the Colorado Oil and Gas Conservation Commission (COGCC) ordered the high-volume well shutdown for 20 days. The well has since restarted injection at lower rates, with the potential to increase injection rates over time. The shutdown and resumption of smaller injection volumes provides the unique opportunity to directly evaluate the seismicity's relationship to well operations.
Experimental investigation of a new method for advanced fast reactor shutdown cooling
NASA Astrophysics Data System (ADS)
Pakholkov, V. V.; Kandaurov, A. A.; Potseluev, A. I.; Rogozhkin, S. A.; Sergeev, D. A.; Troitskaya, Yu. I.; Shepelev, S. F.
2017-07-01
We consider a new method for fast reactor shutdown cooling using a decay heat removal system (DHRS) with a check valve. In this method, a coolant from the decay heat exchanger (DHX) immersed into the reactor upper plenum is supplied to the high-pressure plenum and, then, inside the fuel subassemblies (SAs). A check valve installed at the DHX outlet opens by the force of gravity after primary pumps (PP-1) are shut down. Experimental studies of the new and alternative methods of shutdown cooling were performed at the TISEY test facility at OKBM. The velocity fields in the upper plenum of the reactor model were obtained using the optical particle image velocimetry developed at the Institute of Applied Physics (Russian Academy of Sciences). The study considers the process of development of natural circulation in the reactor and the DHRS models and the corresponding evolution of the temperature and velocity fields. A considerable influence of the valve position in the displacer of the primary pump on the natural circulation of water in the reactor through the DHX was discovered (in some modes, circulation reversal through the DHX was obtained). Alternative DHRS designs without a shell at the DHX outlet with open and closed check valve are also studied. For an open check valve, in spite of the absence of a shell, part of the flow is supplied through the DHX pipeline and then inside the SA simulators. When simulating power modes of the reactor operation, temperature stratification of the liquid was observed, which increased in the cooling mode via the DHRS. These data qualitatively agree with the results of tests at BN-600 and BN-800 reactors.
EBR-II Static Neutronic Calculations by PHISICS / MCNP6 codes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Paolo Balestra; Carlo Parisi; Andrea Alfonsi
2016-02-01
The International Atomic Energy Agency (IAEA) launched a Coordinated Research Project (CRP) on the Shutdown Heat Removal Tests (SHRT) performed in the '80s at the Experimental fast Breeder Reactor EBR-II, USA. The scope of the CRP is to improve and validate the simulation tools for the study and the design of the liquid metal cooled fast reactors. Moreover, training of the next generation of fast reactor analysts is being also considered the other scope of the CRP. In this framework, a static neutronic model was developed, using state-of-the art neutron transport codes like SCALE/PHISICS (deterministic solution) and MCNP6 (stochastic solution).more » Comparison between both solutions is briefly illustrated in this summary.« less
Slow versus fast subcutaneous heparin injections for prevention of bruising and site-pain intensity.
Akbari Sari, Ali; Janani, Leila; Mohammady, Mina; Nedjat, Saharnaz
2014-07-18
Heparin is an anticoagulant medication that is normally injected subcutaneously. Subcutaneous administration of heparin may result in complications such as bruising, haematoma and pain at the injection site. One of the factors that may affect pain, haematoma and bruising is injection speed. To assess the effects of the duration (speed) of subcutaneous heparin injection on pain, haematoma and bruising at the injection site in people admitted to hospitals or clinics who require treatment with unfractionated heparin or low molecular weight heparin. The Cochrane Peripheral Vascular Diseases Group Trials Search Co-ordinator searched the Specialised Register (last searched August 2013) and CENTRAL (2013, Issue 7). We searched MEDLINE, EMBASE, CINAHL and two Persian databases Iranmedex and SID (August 2013). We sought randomised controlled trials (RCTs) comparing the effects of different durations of subcutaneous injections of heparin on pain, bruising and haematoma at the injection site. Two review authors, working independently, extracted data onto a structured form and assessed study quality. We used the criteria recommended by the Cochrane Handbook to assess the quality of included studies. The study outcomes were summarised using quantitative and qualitative methods. One RCT was identified which met the inclusion criteria, involving 50 participants with a mean age of 55.25 (± 12.37) years. In this trial it was not possible to blind the participants and care givers. The method of sequence generation and allocation concealment was not described. The overall quality of the evidence was moderate due to the single small included study. Each participant had two injections, one in the left side and one in right side of the abdomen. One of these was injected slowly (intervention) and the other was injected fast (control). The second injection was 12 hours after the first injection. The duration of fast injection was 10 seconds and the duration of slow injection was 30 seconds. The study reported a significantly lower pain intensity for slow versus fast injection. The mean pain intensity was 13.9 ± 17.1 mm with the slow injection and 20.6 ± 22.3 mm with the fast injection (P < 0.001). In addition the bruising sizes were smaller with slow injections compared to fast injections at 48 hours follow-up (mean bruising size 18.76 ± 9.32 mm(2) with the slow injection and 109.2 ± 468.66 mm(2) with the fast injection, P = 0.033) and 72 hours follow-up (mean bruising size 21.72 ± 76.16 mm(2) with the slow injection and 110.12 ± 472.86 mm(2) with the fast injection, P = 0.025). The incidence of haematoma was not measured as an outcome. There is only limited evidence of any difference in pain intensity and bruising sizes following slow versus fast injections due to the inclusion of only one small unblinded trial. The single included study suggests that slow injection might have slightly lower pain intensity and bruising size at the heparin injection site, but the results should be considered with caution. Until more reliable evidence emerges, slow injection might be the preferred approach.
Surface air quality implications of volcanic injection heights
NASA Astrophysics Data System (ADS)
Thomas, Manu Anna; Brännström, Niklas; Persson, Christer; Grahn, Håkan; von Schoenberg, Pontus; Robertson, Lennart
2017-10-01
Air quality implications of volcanic eruptions have gained increased attention recently in association with the 2010 Icelandic eruption that resulted in the shut-down of European air space. The emission amount, injection height and prevailing weather conditions determine the extent of the impact through the spatio-temporal distribution of pollutants. It is often argued that in the case of a major eruption in Iceland, like Laki in 1783-1784, that pollutants injected high into the atmosphere lead to substantially increased concentrations of sulfur compounds over continental Europe via long-range transport in the jet stream and eventual large-scale subsidence in a high-pressure system. Using state-of-the-art simulations, we show that the air quality impact of Icelandic volcanoes is highly sensitive to the injection height. In particular, it is the infinitesimal injections into the lower half of the troposphere, rather than the substantial injections into the upper troposphere/lower stratosphere that contribute most to increased pollutant concentrations, resulting in atmospheric haze over mainland Europe/Scandinavia. Besides, the persistent high pressure system over continental Europe/Scandinavia traps the pollutants from dispersing, thereby prolonging the haze.
Fast-acting nuclear reactor control device
Kotlyar, Oleg M.; West, Phillip B.
1993-01-01
A fast-acting nuclear reactor control device for moving and positioning a fety control rod to desired positions within the core of the reactor between a run position in which the safety control rod is outside the reactor core, and a shutdown position in which the rod is fully inserted in the reactor core. The device employs a hydraulic pump/motor, an electric gear motor, and solenoid valve to drive the safety control rod into the reactor core through the entire stroke of the safety control rod. An overrunning clutch allows the safety control rod to freely travel toward a safe position in the event of a partial drive system failure.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-07-01
Volume 4 contains the following appendices: nuclear reactors at educational institutions in the United States; data sheets for nuclear reactors at educational institutions in the United States(operational reactors and shut-down reactors); supplemental data for Fort St. Vrain spent fuel; supplemental data for Peach Bottom 1 spent fuel; and supplemental data for Fast Flux Test Facility.
Johanson, Edward W.; Simms, Richard
1981-01-01
A scram signal generating circuit for nuclear reactor installations monitors a flow signal representing the flow rate of the liquid sodium coolant which is circulated through the reactor, and initiates reactor shutdown for a rapid variation in the flow signal, indicative of fuel motion. The scram signal generating circuit includes a long-term drift compensation circuit which processes the flow signal and generates an output signal representing the flow rate of the coolant. The output signal remains substantially unchanged for small variations in the flow signal, attributable to long term drift in the flow rate, but a rapid change in the flow signal, indicative of a fast flow variation, causes a corresponding change in the output signal. A comparator circuit compares the output signal with a reference signal, representing a given percentage of the steady state flow rate of the coolant, and generates a scram signal to initiate reactor shutdown when the output signal equals the reference signal.
Johanson, E.W.; Simms, R.
A scram signal generating circuit for nuclear reactor installations monitors a flow signal representing the flow rate of the liquid sodium coolant which is circulated through the reactor, and initiates reactor shutdown for a rapid variation in the flow signal, indicative of fuel motion. The scram signal generating circuit includes a long-term drift compensation circuit which processes the flow signal and generates an output signal representing the flow rate of the coolant. The output signal remains substantially unchanged for small variations in the flow signal, attributable to long term drift in the flow rate, but a rapid change in the flow signal, indicative of a fast flow variation, causes a corresponding change in the output signal. A comparator circuit compares the output signal with a reference signal, representing a given percentage of the steady state flow rate of the coolant, and generates a scram signal to initiate reactor shutdown when the output signal equals the reference signal.
LMFBR system-wide transient analysis: the state of the art and US validation needs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khatib-Rahbar, M.; Guppy, J.G.; Cerbone, R.J.
1982-01-01
This paper summarizes the computational capabilities in the area of liquid metal fast breeder reactor (LMFBR) system-wide transient analysis in the United States, identifies various numerical and physical approximations, the degree of empiricism, range of applicability, model verification and experimental needs for a wide class of protected transients, in particular, natural circulation shutdown heat removal for both loop- and pool-type plants.
Purification of liquid metal systems with sodium coolant from oxygen using getters
NASA Astrophysics Data System (ADS)
Kozlov, F. A.; Konovalov, M. A.; Sorokin, A. P.
2016-05-01
For increasing the safety and economic parameters of nuclear power stations (NPSs) with sodium coolant, it was decided to install all systems contacting radioactive sodium, including purification systems of circuit I, in the reactor vessel. The performance and capacity of cold traps (CTs) (conventional element of coolant purification systems) in these conditions are limited by their volume. It was proposed to use hot traps (HTs) in circuit I for coolant purification from oxygen. It was demonstrated that, at rated parameters of the installation when the temperature of the coolant streamlining the getter (gas absorber) is equal to 550°C, the hot trap can provide the required coolant purity. In shutdown modes at 250-300°C, the performance of the hot trap is reduced by four orders of magnitude. Possible HT operation regimes for shutdown modes and while reaching rated parameters were proposed and analyzed. Basic attention was paid to purification modes at power rise after commissioning and accidental contamination of the coolant when the initial oxygen concentration in it reached 25 mln-1. It was demonstrated that the efficiency of purification systems can be increased using HTs with the getter in the form of a foil or granules. The possibility of implementing the "fast purification" mode in which the coolant is purified simultaneously with passing over from the shutdown mode to the rated parameters was substantiated.
Fuel cell system logic for differentiating between rapid and normal shutdown commands
Keskula, Donald H.; Doan, Tien M.; Clingerman, Bruce J.
2000-01-01
A method of controlling the operation of a fuel cell system wherein each shutdown command for the system is subjected to decision logic which determines whether the command should be a normal shutdown command or rapid shutdown command. If the logic determines that the shutdown command should be a normal shutdown command, then the system is shutdown in a normal step-by-step process in which the hydrogen stream is consumed within the system. If the logic determines that the shutdown command should be a rapid shutdown command, the hydrogen stream is removed from the system either by dumping to atmosphere or routing to storage.
Fast shut-down protection system for radio frequency breakdown and multipactor testing.
Graves, T P; Hanson, P; Michaelson, J M; Farkas, A D; Hubble, A A
2014-02-01
Radio frequency (RF) breakdown such as multipactor or ionization breakdown is a device-limiting phenomenon for on-orbit spacecraft used for communication, navigation, or other RF payloads. Ground testing is therefore part of the qualification process for all high power components used in these space systems. This paper illustrates a shut-down protection system to be incorporated into multipactor/ionization breakdown ground testing for susceptible RF devices. This 8 channel system allows simultaneous use of different diagnostic classes and different noise floors. With initiation of a breakdown event, diagnostic signals increase above a user-specified level, which then opens an RF switch to eliminate RF power from the high power amplifier. Examples of this system in use are shown for a typical setup, illustrating the reproducibility of breakdown threshold voltages and the lack of multipactor conditioning. This system can also be utilized to prevent excessive damage to RF components in tests with sensitive or flight hardware.
Faraday-cup-type lost fast ion detector on Heliotron J.
Yamamoto, S; Ogawa, K; Isobe, M; Darrow, D S; Kobayashi, S; Nagasaki, K; Okada, H; Minami, T; Kado, S; Ohshima, S; Weir, G M; Nakamura, Y; Konoshima, S; Kemmochi, N; Ohtani, Y; Mizuuchi, T
2016-11-01
A Faraday-cup type lost-fast ion probe (FLIP) has been designed and installed in Heliotron J for the purpose of the studies of interaction between fast ions and MHD instabilities. The FLIP can measure the co-going fast ions whose energy is in the range of 1.7-42.5 keV (proton) and pitch angle of 90 ∘ -140 ∘ , especially for fast ions having the injection energy of neutral beam injection (NBI). The FLIP successfully measured the re-entering passing ions and trapped lost-fast ions caused by fast-ion-driven energetic particle modes in NBI heated plasmas.
NASA Technical Reports Server (NTRS)
Singh, J. J.; Davis, W. T.; Puster, R. L.
1983-01-01
A fast-response oxygen monitoring and control system, based on a Y2O3-stabilized ZrO2 sensor, was developed and tested in the laboratory. The system is capable of maintaining oxygen concentration in the CH4-O2-air combustion product gases at 20.9 + or - 1.0 percent. If the oxygen concentration in the exhaust stream differs from that in normal air by 25 percent or more, an alarm signal is provided for automatic tunnel shutdown. The overall prototype system response time was reduced from about 1 sec in the original configuration to about 0.2 sec. The basis of operation and the results of laboratory tests of the system are described.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Connolly, R.; Dawson, C.; Jao, S.
2016-08-05
Three problems with the eIPMs were corrected during the 2015 summer shutdown. These involved ac coupling and 'negative profiles', detector 'dead zone' created by biasing, and gain control on ramp. With respect to Run 16, problems dealt with included gain depletion on horizontal MCP and rf pickup on profile signals; it was found that the MCP was severely damaged over part of the aperture. Various corrective measures were applied. Some results of these measured obtained during Run 16 are shown. At the end of Run 16 there was a three-day beam run to study polarized proton beams in the AGS.more » Attempts to minimize beam injection errors which increase emittance by using the eIPMs to measure the contribution of injection mismatch to the AGS output beam emittance are recounted. .« less
Susi, Louis; Reader, Al; Nusstein, John; Beck, Mike; Weaver, Joel; Drum, Melissa
2008-01-01
The authors, using a crossover design, randomly administered, in a single-blind manner, 3 primary intraosseous injections to 61 subjects using: the Wand local anesthetic system at a deposition rate of 45 seconds (fast injection); the Wand local anesthetic system at a deposition rate of 4 minutes and 45 seconds (slow injection); a conventional syringe injection at a deposition rate of 4 minutes and 45 seconds (slow injection), in 3 separate appointments spaced at least 3 weeks apart. A pulse oximeter measured heart rate (pulse). The results demonstrated the mean maximum heart rate was statistically higher with the fast intraosseous injection (average 21 to 28 beats/min increase) than either of the 2 slow intraosseous injections (average 10 to 12 beats/min increase). There was no statistically significant difference between the 2 slow injections. We concluded that an intraosseous injection of 1.4 mL of 2% lidocaine with 1 : 100,000 epinephrine with the Wand at a 45-second rate of anesthetic deposition resulted in a significantly higher heart rate when compared with a 4-minute and 45-second anesthetic solution deposition using either the Wand or traditional syringe. PMID:18327970
Susi, Louis; Reader, Al; Nusstein, John; Beck, Mike; Weaver, Joel; Drum, Melissa
2008-01-01
The authors, using a crossover design, randomly administered, in a single-blind manner, 3 primary intraosseous injections to 61 subjects using: the Wand local anesthetic system at a deposition rate of 45 seconds (fast injection); the Wand local anesthetic system at a deposition rate of 4 minutes and 45 seconds (slow injection); a conventional syringe injection at a deposition rate of 4 minutes and 45 seconds (slow injection), in 3 separate appointments spaced at least 3 weeks apart. A pulse oximeter measured heart rate (pulse). The results demonstrated the mean maximum heart rate was statistically higher with the fast intraosseous injection (average 21 to 28 beats/min increase) than either of the 2 slow intraosseous injections (average 10 to 12 beats/min increase). There was no statistically significant difference between the 2 slow injections. We concluded that an intraosseous injection of 1.4 mL of 2% lidocaine with 1 : 100,000 epinephrine with the Wand at a 45-second rate of anesthetic deposition resulted in a significantly higher heart rate when compared with a 4-minute and 45-second anesthetic solution deposition using either the Wand or traditional syringe.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yamamoto, S., E-mail: yamamoto.satoshi.6n@kyoto-u.ac.jp; Kobayashi, S.; Nagasaki, K.
A Faraday-cup type lost-fast ion probe (FLIP) has been designed and installed in Heliotron J for the purpose of the studies of interaction between fast ions and MHD instabilities. The FLIP can measure the co-going fast ions whose energy is in the range of 1.7–42.5 keV (proton) and pitch angle of 90{sup ∘}–140{sup ∘}, especially for fast ions having the injection energy of neutral beam injection (NBI). The FLIP successfully measured the re-entering passing ions and trapped lost-fast ions caused by fast-ion-driven energetic particle modes in NBI heated plasmas.
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...
A kind of fast shutter for Z pinch diagnosis device.
Wang, Liangping; Zhang, Xinjun; Sun, Tieping; Mao, Wentin
2016-09-01
A kind of fast shutter for protecting the diagnosis devices in Z pinch experiments is introduced in this paper. The shutter is composed of a pulling rod, a magnetic core, and a solenoid. Different from the traditional coils which were used at the voltage of 220 V, the solenoid we used must endure the high voltage of 5-10 kV and the deformation which maybe caused by the 5-10 T intense magnetic field. A creative configuration for the solenoid is developed including the winding guide, insulating sleeve, and stainless-steel sleeve. The experimental results show that the configuration of the solenoid is effective. The velocity of the valve is nearly 19 m/s and the time jitter of the shutdown is within 75 μs.
A kind of fast shutter for Z pinch diagnosis device
NASA Astrophysics Data System (ADS)
Wang, Liangping; Zhang, Xinjun; Sun, Tieping; Mao, Wentin
2016-09-01
A kind of fast shutter for protecting the diagnosis devices in Z pinch experiments is introduced in this paper. The shutter is composed of a pulling rod, a magnetic core, and a solenoid. Different from the traditional coils which were used at the voltage of 220 V, the solenoid we used must endure the high voltage of 5-10 kV and the deformation which maybe caused by the 5-10 T intense magnetic field. A creative configuration for the solenoid is developed including the winding guide, insulating sleeve, and stainless-steel sleeve. The experimental results show that the configuration of the solenoid is effective. The velocity of the valve is nearly 19 m/s and the time jitter of the shutdown is within 75 μs.
NASA Astrophysics Data System (ADS)
Gradoboev, A. V.; Orlova, K. N.; Simonova, A. V.
2018-05-01
The paper presents the research results of watt and volt characteristics of LEDs based upon AlGaInP heterostructures with multiple quantum wells in the active region. The research is completed for LEDs (emission wavelengths 624 nm and 590 nm) under irradiation by fast neutron and gamma-quanta in passive powering mode. Watt-voltage characteristics in the average and high electron injection areas are described as a power function of the operating voltage. It has been revealed that the LEDs transition from average electron injection area to high electron injection area occurs by overcoming the transition area. It disappears as it get closer to the limit result of the irradiation LEDs that is low electron injection mode in the entire supply voltage range. It has been established that the gamma radiation facilitates initial defects restructuring only 42% compared to 100% when irradiation is performed by fast neutrons. Ratio between measured on the boundary between low and average electron injection areas current value and the contribution magnitude of the first stage LEDs emissive power reducing is established. It is allows to predict LEDs resistance to irradiation by fast neutrons and gamma rays.
Plasma Rotation During Neutral Beam Injection In MST
NASA Astrophysics Data System (ADS)
Hudson, Ben; Ding, W.; Fiksel, G.; Prager, S.; Yates, T.
2006-10-01
The effect of fast ions from neutral beam injection (20 keV, 30 A, 1.5 ms) on plasma rotation and magnetic tearing modes is studied. We observe that during co-injected NBI (with the injection in the same direction as the plasma and mode rotation) the rotation of the core-resonant n = 5 magnetic mode decreases and in many instances lock to the vessel wall. There is an associated drop in the poloidal component of n = 5 magnetic mode amplitude. The drop in the mode velocity suggests a counter-directed torque, perhaps due to modification of the radial electric field. The rotation slows during the injection phase, then restores itself on the timescale of the fast ion slowing down time (5 ms @ Te = 100 eV). The fluctuation-induced j x b Maxwell stress is measured using MST's FIR diagnostic and presented for comparison. Equilibrium reconstruction suggests a small increase in on-axis J||, consistent with the presence of a localized fast ion population moving in the direction of the plasma current. Mode rotation during NBI counter-injection is also presented.
40 CFR 63.1111 - Startup, shutdown, and malfunction.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction. 63.1111 Section 63.1111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and...
Upgrade of Irradiation Test Capability of the Experimental Fast Reactor Joyo
NASA Astrophysics Data System (ADS)
Sekine, Takashi; Aoyama, Takafumi; Suzuki, Soju; Yamashita, Yoshioki
2003-06-01
The JOYO MK-II core was operated from 1983 to 2000 as fast neutron irradiation bed. In order to meet various requirements for irradiation tests for development of FBRs, the JOYO upgrading project named MK-III program was initiated. The irradiation capability in the MK-III core will be about four times larger than that of the MK-II core. Advanced irradiation test subassemblies such as capsule type subassembly and on-line instrumentation rig are planned. As an innovative reactor safety system, the irradiation test of Self-Actuated Shutdown System (SASS) will be conducted. In order to improve the accuracy of neutron fluence, the core management code system was upgraded, and the Monte Carlo code and Helium Accumulation Fluence Monitor (HAFM) were applied. The MK-III core is planned to achieve initial criticality in July 2003.
Methodology of the Westinghouse dynamic rod worth measurement technique
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chao, Y.A.; Chapman, D.M.; Easter, M.E.
1992-01-01
During zero-power physics testing, plant operations personnel use one of various techniques to measure the reactivity worth of the control rods to confirm shutdown margin. A simple and fast procedure for measuring rod worths called dynamic rod worth measurement (DRWM) has been developed at Westinghouse. This procedure was tested at the recent startups of Point Beach Nuclear Power Plant Unit 1 cycle 20 and Unit 2 cycle 18. The results of these tests show that DRWM measures rod worths with accuracy comparable to that of both boron dilution and rod bank exchange measurements. The DRWM procedure is a fast processmore » of measuring the reactivity worth of individual banks by inserting and withdrawing the bank continuously at the maximum stepping speed without changing the boron concentration and recording the signals of the ex-core detectors.« less
Beam-based measurement of the center of the new STAR pipe
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert-Demolaize, G.
During the RHIC Shutdown preceding Run13 for polarized protons, various upgrades were brought to the STAR detector, one of which being the partial installation of the Forward GEM Tracker (FGT). This installation includes a new beam pipe at the center of the detector with an internal radius half the size of what the replaced pipe was, from 40 mm to 20 mm. The following reviews the results of a vertical aperture scans in the STAR interaction region performed at injection energy with both beams, and gives an estimate of the measured transverse offset of the new STAR pipe.
NASA Astrophysics Data System (ADS)
Wang, Shilong; Yin, Changchun; Lin, Jun; Yang, Yu; Hu, Xueyan
2016-03-01
Cooperative work of multiple magnetic transmitting sources is a new trend in the development of transient electromagnetic system. The key is the bipolar current waves shutdown, concurrently in the inductive load. In the past, it was difficult to use the constant clamping voltage technique to realize the synchronized shutdown of currents with different peak values. Based on clamping voltage technique, we introduce a new controlling method with constant shutdown time. We use the rising time to control shutdown time and use low voltage power source to control peak current. From the viewpoint of the circuit energy loss, by taking the high-voltage capacitor bypass resistance and the capacitor of the passive snubber circuit into account, we establish the relationship between the rising time and the shutdown time. Since the switch is not ideal, we propose a new method to test the shutdown time by the low voltage, the high voltage and the peak current. Experimental results show that adjustment of the current rising time can precisely control the value of the clamp voltage. When the rising time is fixed, the shutdown time is unchanged. The error for shutdown time deduced from the energy consumption is less than 6%. The new controlling method on current shutdown proposed in this paper can be used in the cooperative work of borehole and ground transmitting system.
Wang, Shilong; Yin, Changchun; Lin, Jun; Yang, Yu; Hu, Xueyan
2016-03-01
Cooperative work of multiple magnetic transmitting sources is a new trend in the development of transient electromagnetic system. The key is the bipolar current waves shutdown, concurrently in the inductive load. In the past, it was difficult to use the constant clamping voltage technique to realize the synchronized shutdown of currents with different peak values. Based on clamping voltage technique, we introduce a new controlling method with constant shutdown time. We use the rising time to control shutdown time and use low voltage power source to control peak current. From the viewpoint of the circuit energy loss, by taking the high-voltage capacitor bypass resistance and the capacitor of the passive snubber circuit into account, we establish the relationship between the rising time and the shutdown time. Since the switch is not ideal, we propose a new method to test the shutdown time by the low voltage, the high voltage and the peak current. Experimental results show that adjustment of the current rising time can precisely control the value of the clamp voltage. When the rising time is fixed, the shutdown time is unchanged. The error for shutdown time deduced from the energy consumption is less than 6%. The new controlling method on current shutdown proposed in this paper can be used in the cooperative work of borehole and ground transmitting system.
A novel upgrade to Helsinki AMS: Fast switching of isotopes with electrostatic deflectors
NASA Astrophysics Data System (ADS)
Palonen, V.; Tikkanen, P.
2015-10-01
We have developed and installed electrostatic deflectors at the injection magnet entrance and exit to enable fast switching between isotopes in AMS measurements. The fast selection of the injected isotope, stable isotope current measurements, and rare isotope detection are all performed with three synchronized real-time NI-PXI computers. With the improvements, we are able to attain a precision of better than 0.2% for the 14C/13C ratio of modern samples.
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
40 CFR 63.762 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...
40 CFR 63.1272 - Startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cletcher, J.W.
1995-10-01
This is a regular report of summary statistics relating to recent reactor shutdown experience. The information includes both number of events and rates of occurence. It was compiled from data about operating events that were entered into the SCSS data system by the Nuclear Operations Analysis Center at the Oak ridge National Laboratory and covers the six mont period of July 1 to December 31, 1994. Cumulative information, starting from May 1, 1994, is also reported. Updates on shutdown events included in earlier reports is excluded. Information on shutdowns as a function of reactor power at the time of themore » shutdown for both BWR and PWR reactors is given. Data is also discerned by shutdown type and reactor age.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2012 CFR
2012-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2014 CFR
2014-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2011 CFR
2011-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2013 CFR
2013-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2013 CFR
2013-07-01
... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...
Code of Federal Regulations, 2010 CFR
2010-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2014 CFR
2014-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Code of Federal Regulations, 2012 CFR
2012-07-01
... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...
Characterization of On-Orbit U.S. Lab Condensate Vacuum Venting
NASA Astrophysics Data System (ADS)
Schmidl, W. D.; Alred, J. A.; Mikatarian, R.; Soares, C.; Miles, E.
2002-01-01
The venting of liquid streams into a vacuum has been studied extensively for many years. An experiment was performed aboard the International Space Station (ISS) to video tape the U.S. Lab's condensate venting event with cameras located on the Space Station Remote Manipulator System (SSRMS). Images of the vent plume were acquired close to both the port and starboard vent nozzles. The imaging started with a wider view and then zoomed in closer before the shutdown phase of the vent event occurred. The objective of this experiment was to extend our understanding of the properties of venting liquids into space. Data from the video images were analyzed to obtain the approximate cone angle encompassing the core of the vent plume. The condensate vent plume was characterized as having three phases, a startup phase, a nominal phase, and a shutdown phase. The startup phase consisted of the initial period when the vent first started and the liquid first entered the heated line. The nominal phase was the period when the majority of the liquid was vented. The shutdown phase occurs close to the end of the vent event. The shutdown phase was further divided into two parts, the shutdown initial phase, and a later shutdown sputtering phase. The shutdown initial phase occurs when gas becomes entrained in the condensate liquid being vented. The sputtering phase occurred after the vent valve was closed, and the liquid/ice in the line was removed by continuing to heat the line to bake it out. It was determined that the ice particles were ejected at higher angles, but lower velocities, during the startup and shutdown phases. The number and velocities of ice particles ejected outside of the core region, during the startup, initial shutdown and shutdown sputtering phases were determined. The core of liquid ejected during the startup and shutdown phases was contained within a half cone angle of less than 60 degrees. The startup phase took approximately 36 seconds, the shutdown initial phase took approximately 22 seconds, and the shutdown sputtering phase took approximately 32 seconds. Results from the experiment were correlated with the Boeing ISS vent plume model.
A Experimental Investigation of Fast Ion Confinement on the Isx-B Tokamak
NASA Astrophysics Data System (ADS)
Carnevali, Antonino
An experimental investigation of fast ion confinement was conducted on the ISX-B tokamak at the Oak Ridge National Laboratory to ascertain that the beam ion behavior is properly described by classical processes. Data were collected during tangential injection of H('0) beams (co-, counter -, and co- plus counter-) at power levels up to 1.9 MW in low plasma current (I(,p) = 80 to 215 kA) D('+) discharges. Experimental energy spectra of energetic charge-exchange neutrals along several sightlines in the torus equatorial plane are compared with the predictions of Fokker-Planck and orbit-following Monte Carlo calculations to verify the validity of classical theory. A further tool used in this investigation is the comparison of predicted and experimental beam-plasma neutron emission during injection of beams doped with 3% D('0). Both the fast neutral spectra and the beam-plasma neutron emission are in close agreement (within factors of <2) with the calculated values under a variety of plasma parameters, beam parameters, and injection geometries. Furthermore, measured decay rates of the beam-plasma neutron production following beam turn-off show that the beam slowing down --at energies close to the injection energy and in the plasma core-- is classical within a 30% uncertainty. These results demonstrate that classical theory describes well the behavior of the beam ions. Moreover, MHD activity is shown not to cause enhanced fast ion losses in the ISX-B. Also, beam additivity experiments indicate that the fast ion density in the plasma volume is proportional to the injected beam power P(,b). An unresolved issue is whether the central fast ion density is linear with P(,b). In addition, the analysis of charge-exchange spectra is critically evaluated. It is shown that the analysis need be integrated with a knowledge of the orbit topology to correctly interpret the spectra. Cases where the zero banana width, Fokker-Planck calculation is adequate/inadequate to predict fast neutral spectra and power deposited in the plasma are discussed.
Şimşek Ülkü, Hatice; Güneş, Yasemin; Ilgınel, Murat; Biricik, Ebru; Karacaer, Feride
2017-10-01
In this study, we aimed to determine the effect of remifentanil administration prior to slow and fast rocuronium infusion on hemodynamic changes and rocuronium injection pain in pediatric patients. In total, 120 5-15-year-old ASA score I/II pediatric patients were included in the study. Group A: slow rocuronium injection-saline; group B: slow rocuronium injection (0.6 mg/kg IV)-remifentanyl; group C: fast rocuronium injection-saline; and group D: fast rocuronium injection-remifentanyl. Withdrawal movement after rocuronium injection was recorded based on a 3-point response to withdrawal score. Hemodynamic parameters were recorded. One minute after rocuronium injection, HR values were found to be lower in remifentanil groups (p: 0.0001; 101.4±22.1, p: 0.003; 99.8±18.3 in group B and D, respectively) compared with those in placebo groups (p: 0.025; 107.4±21.7, p: 0.012; 114.0±16.4 in group A and C, respectively). With respect to the response to withdrawal scores, unresponsiveness rates were the highest in group B (66.7%) and group D (70%). The number of non-responder patients was 9 in saline-administered groups (group A and C), whereas it was 20 and 21 in remifentanil-administered groups (group B and D, respectively). Generalized responses were observed predominantly in groups A (20%) and C (20%). Generalized responses were highest in groups A (20%, n=6) and C (20%, n=6). There was no impact of infusion speed on rocuronium injection pain in pediatric cases, whereas it is concluded that remifentanil administration prior to rocuronium injection considerably reduced rocuronium injection pain regardless of injection speed and without serious hemodynamic changes.
FY2017 Updates to the SAS4A/SASSYS-1 Safety Analysis Code
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fanning, T. H.
The SAS4A/SASSYS-1 safety analysis software is used to perform deterministic analysis of anticipated events as well as design-basis and beyond-design-basis accidents for advanced fast reactors. It plays a central role in the analysis of U.S. DOE conceptual designs, proposed test and demonstration reactors, and in domestic and international collaborations. This report summarizes the code development activities that have taken place during FY2017. Extensions to the void and cladding reactivity feedback models have been implemented, and Control System capabilities have been improved through a new virtual data acquisition system for plant state variables and an additional Block Signal for a variablemore » lag compensator to represent reactivity feedback for novel shutdown devices. Current code development and maintenance needs are also summarized in three key areas: software quality assurance, modeling improvements, and maintenance of related tools. With ongoing support, SAS4A/SASSYS-1 can continue to fulfill its growing role in fast reactor safety analysis and help solidify DOE’s leadership role in fast reactor safety both domestically and in international collaborations.« less
Explosive electromagnetic radiation by the relaxation of a multimode magnon system.
Vasyuchka, V I; Serga, A A; Sandweg, C W; Slobodianiuk, D V; Melkov, G A; Hillebrands, B
2013-11-01
Microwave emission from a parametrically pumped ferrimagnetic film of yttrium iron garnet was studied versus the magnon density evolution, which was detected by Brillouin light scattering spectroscopy. It has been found that the shutdown of external microwave pumping leads to an unexpected effect: The conventional monotonic decrease of the population of parametrically injected magnons is accompanied by an explosive behavior of electromagnetic radiation at the magnon frequency. The developed theory shows that this explosion is caused by a nonlinear energy transfer from parametrically driven short-wavelength dipolar-exchange magnons to a long-wavelength dipolar magnon mode effectively coupled to an electromagnetic wave.
Defense.gov Special Report: Government Shutdown
reached. Government shutdown avoided. Business as usual for all DOD employees. Deal Averts Shutdown Continuing Resolution (PDF) Deputy Secretary Lynn Message OMB Director Memo to Agencies (PDF) DOD Contingency
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor rectifier must have a high temperature alarm or shutdown, except as provided in § 111.33-11. ...
Pereira, Polyana F; Marra, Mariana C; Munoz, Rodrigo A A; Richter, Eduardo M
2012-02-15
A simple, accurate and fast (180 injections h(-1)) batch injection analysis (BIA) system with multiple-pulse amperometric detection has been developed for selective determination of ethanol in gasohol and fuel ethanol. A sample aliquot (100 μL) was directly injected onto a gold electrode immersed in 0.5 mol L(-1) NaOH solution (unique reagent). The proposed BIA method requires minimal sample manipulation and can be easily used for on-site analysis. The results obtained with the BIA method were compared to those obtained by gas-chromatography and similar results were obtained (at 95% of confidence level). Published by Elsevier B.V.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Choi, M.; Pinsker, R. I.; Chan, V. S.
2011-12-23
In recent moderate to high harmonic fast wave heating and current drive experiments in DIII-D, a synergy effect was observed when the 6{sup th} harmonic 90 MHz fast wave power is applied to the plasma preheated by neutral beams and the 4{sup th} harmonic 60 MHz fast wave. In this paper, we investigate how the synergy can occur using ORBIT-RF coupled with AORSA. Preliminary simulations suggest that damping of 4{sup th} harmonic FW on beam ions accelerates them above the injection energy, which may allow significant damping of 6{sup th} harmonic FW on beam ion tails to produce synergy.
The 2013 US Government Shutdown (#Shutdown) and health: an emerging role for social media.
Merchant, Raina M; Ha, Yoonhee P; Wong, Charlene A; Schwartz, H Andrew; Sap, Maarten; Ungar, Lyle H; Asch, David A
2014-12-01
In October 2013, multiple United States (US) federal health departments and agencies posted on Twitter, "We're sorry, but we will not be tweeting or responding to @replies during the shutdown. We'll be back as soon as possible!" These "last tweets" and the millions of responses they generated revealed social media's role as a forum for sharing and discussing information rapidly. Social media are now among the few dominant communication channels used today. We used social media to characterize the public discourse and sentiment about the shutdown. The 2013 shutdown represented an opportunity to explore the role social media might play in events that could affect health.
Fast Flux Test Facility thermal and pressure transient events during Cycle 11
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahrens, D. M.
1992-03-01
This report documents the thermal and pressure transients experienced by the Reactor Heat Transport System (RHTS) during Cycle 11 which included Cycles 11A, 11B-1, 11B-2 and 11C (i.e. 4 startups and 4 shutdowns). Cycle 11 consisted of a refueling period that began on March 14, 1989 and power operation which began on May 3, 1989 and ended on October 27, 1990. Transients resulted from secondary pump starts/stops while at refueling conditions. The major causes of transients at power were five unplanned reactor scrams from 100% power and problems with Loop 2 DHX Fan Controls During 11A.
Pulse shape discrimination based on fast signals from silicon photomultipliers
NASA Astrophysics Data System (ADS)
Yu, Junhao; Wei, Zhiyong; Fang, Meihua; Zhang, Zixia; Cheng, Can; Wang, Yi; Su, Huiwen; Ran, Youquan; Zhu, Qingwei; Zhang, He; Duan, Kai; Chen, Ming; Liu, Meng
2018-06-01
Recent developments in organic plastic scintillators capable of pulse shape discrimination (PSD) enable a breakthrough in discrimination between neutrons and gammas. Plastic scintillator detectors coupled with silicon photomultipliers (SiPMs) offer many advantages, such as lower power consumption, smaller volume, and especially insensitivity to magnetic fields, compared with conventional photomultiplier tubes (PMTs). A SensL SiPM has two outputs: a standard output and a fast output. It is known that the charge injected into the fast output electrode is typically approximately 2% of the total charge generated during the avalanche, whereas the charge injected into the standard output electrode is nearly 98% of the total. Fast signals from SiPMs exhibit better performance in terms of timing and time-correlated measurements compared with standard signals. The pulse duration of a standard signal is on the order of hundreds of nanoseconds, whereas the pulse duration of the main monopole waveform of a fast signal is a few tens of nanoseconds. Fast signals are traditionally thought to be suitable for photon counting at very high speeds but unsuitable for PSD due to the partial charge collection. Meanwhile, the standard outputs of SiPMs coupled with discriminating scintillators have yielded nice PSD performances, but there have been no reports on PSD using fast signals. Our analysis shows that fast signals can also provide discrimination if the rate of charge injection into the fast output electrode is fixed for each event, even though only a portion of the charge is collected. In this work, we achieved successful PSD using fast signals; meanwhile, using a coincidence timing window of less 3 nanoseconds between the readouts from both ends of the detector reduced the influence of the high SiPM dark current. We experimentally achieved good timing performance and PSD capability simultaneously.
40 CFR 63.1354 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup, shutdown, and... report. Reports shall only be required if a startup, shutdown, or malfunction occurred during the...
Aleem, Alexander W; Syed, Usman Ali M; Nicholson, Thema; Getz, Charles L; Namdari, Surena; Beredjiklian, Pedro K; Abboud, Joseph A
2017-09-01
Corticosteroid injections are used to treat a variety of orthopedic conditions with the goal of decreasing pain and inflammation. Administration of systemic or local corticosteroids risks temporarily increasing blood glucose levels, especially diabetic patients. The purpose of this study is to quantify the effects of corticosteroid injections on blood glucose levels in diabetic patients with shoulder pathology. Diabetic patients who regularly monitored their blood glucose levels and were indicated for a subacromial corticosteroid injection were included in this prospective investigation. The typical normal morning fasting glucose and most recent hemoglobin A1c level was recorded for each patient. After injection, patients were contacted daily to confirm their fasting morning glucose level for 10 days post-injection. Seventeen consecutive patients were enrolled. Patients with hemoglobin A1c of <7% had an average rise in blood glucose of 38 mg/dL compared to 98 mg/dL in the poorly controlled group after injection ( P <0.001). Well-controlled patients' glucose levels returned to near baseline levels around post-injection day 8, while poorly controlled patients levels remained elevated. Similarly, insulin-dependent diabetic patients had an average increase in fasting glucose level of 99 mg/dL versus 50 mg/dL in non-insulin-dependent diabetic patients ( P <0.001). After corticosteroid injection, patients with well-controlled diabetes experience smaller elevations and faster return to baseline glucose levels than patients with poor control. Insulin dependent diabetics experienced similar findings as patients with poor control. Future studies are needed to evaluate dosing to optimize the risks of blood glucose elevation while maintaining therapeutic benefit.
The 2013 US Government Shutdown (#Shutdown) and Health: An Emerging Role for Social Media
Ha, Yoonhee P.; Wong, Charlene A.; Schwartz, H. Andrew; Sap, Maarten; Ungar, Lyle H.; Asch, David A.
2014-01-01
In October 2013, multiple United States (US) federal health departments and agencies posted on Twitter, “We’re sorry, but we will not be tweeting or responding to @replies during the shutdown. We’ll be back as soon as possible!” These “last tweets” and the millions of responses they generated revealed social media’s role as a forum for sharing and discussing information rapidly. Social media are now among the few dominant communication channels used today. We used social media to characterize the public discourse and sentiment about the shutdown. The 2013 shutdown represented an opportunity to explore the role social media might play in events that could affect health. PMID:25322303
Fast ion beta limit measurements by collimated neutron detection in MST plasmas
NASA Astrophysics Data System (ADS)
Capecchi, William; Anderson, Jay; Bonofiglo, Phillip; Kim, Jungha; Sears, Stephanie
2015-11-01
Fast ion orbits in the reversed field pinch (RFP) are well ordered and classically confined despite magnetic field stochasticity generated by multiple tearing modes. Classical TRANSP modeling of a 1MW tangentially injected hydrogen neutral beam in MST deuterium plasmas predicts a core-localized fast ion density that can be up to 25% of the electron density and a fast ion beta of many times the local thermal beta. However, neutral particle analysis of an NBI-driven mode (presumably driven by a fast ion pressure gradient) shows mode-induced transport of core-localized fast ions and a saturated fast ion density. The TRANSP modeling is presumed valid until the onset of the beam-driven mode and gives an initial estimate of the volume-averaged fast ion beta of 1-2% (local core value up to 10%). A collimated neutron detector for fusion product profile measurements will be used to determine the spatial distribution of fast ions, allowing for a first measurement of the critical fast-ion pressure gradient required for mode destabilization. Testing/calibration data and initial fast-ion profiles will be presented. Characterization of both the local and global fast ion beta will be done for deuterium beam injection into deuterium plasmas for comparison to TRANSP predictions. Work supported by US DOE.
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 68.52 - Operating procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...
40 CFR 52.1183 - Visibility protection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... excess emissions that occurs during startups, shutdowns, and malfunctions of the unit, the nature and... that occurs during startups, shutdowns, and malfunctions of the unit, the nature and cause of any... startup, shutdown, and malfunction. (viii) All CEMS required by this section must meet the minimum data...
PRELIMINARY TEST RESULTS OF A PROTOTYPE FAST KICKER FOR APS MBA UPGRADE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yao, C.-Y.; Morrison, L.; Sun, X.
The APS multi-bend achromatic (MBA) upgrade storage ring plans to support two bunch fill patterns: a 48-bunch and a 324-bunch. A “swap out” injection scheme is required. In order to provide the required kick to injected beam, to minimize the beam loss and residual oscillation of injected beam, and to minimize the perturbation to stored beam during injection, the rise, fall, and flat-top parts of the kicker pulse must be within a 16.9-ns interval. Stripline-type kickers are chosen for both injection and extraction. We developed a prototype kicker that supports a ±15kV differential pulse voltage. We performed high voltage discharge,more » TDR measurement, high voltage pulse test and beam test of the kicker. We report the final design of the fast kicker and the test results.« less
Suppression of Alfvénic modes with off-axis NBI
NASA Astrophysics Data System (ADS)
Fredrickson, Eric; Bell, R.; Diallo, A.; Leblanc, B.; Podesta, M.; Levinton, F.; Yuh, H.; Liu, D.
2016-10-01
GAE are seen on NSTX-U in the frequency range from 1 to 3 MHz with injection of the more perpendicular, NSTX neutral beam sources. A new result is that injection of any of the new, more tangential, neutral beam sources with tangency radii larger than the magnetic axis suppress this GAE activity. Simulations of beam deposition and slowing down with the TRANSP code indicate that these new sources deposit fast ions with 0.9
33 CFR 127.1205 - Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Equipment § 127.1205 Emergency shutdown. (a) Each... elements that melt at less than 105 °C (221 °F) and activate the emergency shutdown, or have a sensor that...
33 CFR 127.1205 - Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Equipment § 127.1205 Emergency shutdown. (a) Each... elements that melt at less than 105 °C (221 °F) and activate the emergency shutdown, or have a sensor that...
76 FR 81998 - Methodology for Low Power/Shutdown Fire PRA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0295] Methodology for Low Power/Shutdown Fire PRA AGENCY..., ``Methodology for Low Power/Shutdown Fire PRA--Draft Report for Comment.'' DATES: Submit comments by March 01... risk assessment (PRA) method for quantitatively analyzing fire risk in commercial nuclear power plants...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
40 CFR 63.1164 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...
Efforts to reduce exposure at Japanese PWRs: CVCS improvement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terada, Ryosuke
1995-03-01
Many reports have been focused on the reduction of radiation sources and related occupational exposures. The radiation sources mainly consist of corrosion products. Radiation dose rate is determined by the amount of the activated corrosion products on the surface of the primary loop components of Pressurized Water Reactor (PWR) plants. Therefore, reducing the amount of the corrosion product will contribute to the reduction of occupational exposures. In order to reduce the corrosion products, Chemical and Volume Control System (CVCS) has been improved in Japanese PWRs as follows: (a) Cation Bed Demineralizer Flowrate Control; (b) Hydrogen Peroxide Injection System; (c) Purificationmore » Flowrate During Plant Shutdown; (d) Fine Mesh Filters Upstream of Mixed Bed Demineralizers.« less
Microcapsule-based techniques for improving the safety of lithium-ion batteries
NASA Astrophysics Data System (ADS)
Baginska, Marta
Lithium-ion batteries are vital energy storage devices due to their high specific energy density, lack of memory effect, and long cycle life. While they are predominantly used in small consumer electronics, new strategies for improving battery safety and lifetime are critical to the successful implementation of high-capacity, fast-charging materials required for advanced Li-ion battery applications. Currently, the presence of a volatile, combustible electrolyte and an oxidizing agent (Lithium oxide cathodes) make the Li-ion cell susceptible to fire and explosions. Thermal overheating, electrical overcharging, or mechanical damage can trigger thermal runaway, and if left unchecked, combustion of battery materials. To improve battery safety, autonomic, thermally-induced shutdown of Li-ion batteries is demonstrated by depositing thermoresponsive polymer microspheres onto battery anodes. When the internal temperature of the cell reaches a critical value, the microspheres melt and conformally coat the anode and/or separator with an ion insulating barrier, halting Li-ion transport and shutting down the cell permanently. Charge and discharge capacity is measured for Li-ion coin cells containing microsphere-coated anodes or separators as a function of capsule coverage. Scanning electron microscopy images of electrode surfaces from cells that have undergone autonomic shutdown provides evidence of melting, wetting, and re-solidification of polyethylene (PE) into the anode and polymer film formation at the anode/separator interface. As an extension of this autonomic shutdown approach, a particle-based separator capable of performing autonomic shutdown, but which reduces the shorting hazard posed by current bi- and tri-polymer commercial separators, is presented. This dual-particle separator is composed of hollow glass microspheres acting as a physical spacer between electrodes, and PE microspheres to impart autonomic shutdown functionality. An oil-immersion technique is developed to simulate an overheating condition while the cell is cycling. Experimental protocols are developed to assess the performance of the separator in terms of its ability to perform autonomic shutdown and examine tested battery materials using scanning electron microscopy. Another approach to improving battery functionality is via the microencapsulation of battery additives. Currently, additives are added directly into a battery electrolyte, and while they typically perform their function given a sufficient loading, these additives often do so at the expense of battery performance. Microencapsulation allows for a high loading of additives to be incorporated into the cell and their release triggered only when and where they are needed. In this work, microencapsulation techniques are developed to successfully encapsulate 3-hexylthiophene, a stabilizing agent for high-voltage cathodes in Li-ion batteries and conductive polymer precursor, as well as the flame retardant Tris(2-choloroethyl phosphate) (TCP). Microcapsules containing 3-hexylthiophene are coated onto model battery electrodes and immersed in electrolyte. The microcapsule shell wall insulates the 3-hexylthiophene until the microcapsules are mechanically crushed and electropolymerization of the released core to form poly(3-ht) occurs under cyclic voltammetry. In addition, TCP was encapsulated using in situ polymerization. TCP-containing microcapsules are stable in electrolyte at room temperature, but are thermally triggered to release their payload at elevated temperatures. Experimental protocols are developed to study the in situ triggering and release of microencapsulated additives.
Code of Federal Regulations, 2014 CFR
2014-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2012 CFR
2012-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2011 CFR
2011-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
Code of Federal Regulations, 2013 CFR
2013-07-01
... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
46 CFR 111.33-7 - Alarms and shutdowns.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Alarms and shutdowns. 111.33-7 Section 111.33-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-7 Alarms and shutdowns. Each power semiconductor...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
40 CFR 52.271 - Malfunction, startup, and shutdown regulations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...
77 FR 10576 - Methodology for Low Power/Shutdown Fire PRA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... NUCLEAR REGULATORY COMMISSION [NRC-2011-0295] Methodology for Low Power/Shutdown Fire PRA AGENCY.../Shutdown Fire PRA.'' In response to request from members of the public, the NRC is extending the public... risk assessment (PRA) method for quantitatively analyzing fire risk in commercial nuclear power plants...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
... had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information... requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and malfunction report if...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-08
... SIP Calls To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... SIP Calls to Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.1367 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.10 - Recordkeeping and reporting requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...
40 CFR 63.8635 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...
Decay Heat Removal in GEN IV Gas-Cooled Fast Reactors
Cheng, Lap-Yan; Wei, Thomas Y. C.
2009-01-01
The safety goal of the current designs of advanced high-temperature thermal gas-cooled reactors (HTRs) is that no core meltdown would occur in a depressurization event with a combination of concurrent safety system failures. This study focused on the analysis of passive decay heat removal (DHR) in a GEN IV direct-cycle gas-cooled fast reactor (GFR) which is based on the technology developments of the HTRs. Given the different criteria and design characteristics of the GFR, an approach different from that taken for the HTRs for passive DHR would have to be explored. Different design options based on maintaining core flow weremore » evaluated by performing transient analysis of a depressurization accident using the system code RELAP5-3D. The study also reviewed the conceptual design of autonomous systems for shutdown decay heat removal and recommends that future work in this area should be focused on the potential for Brayton cycle DHRs.« less
Burnable absorber arrangement for fuel bundle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crowther, R.L.; Townsend, D.B.
1986-12-16
This patent describes a boiling water reactor core whose operation is characterized by a substantial proportion of steam voids with concomitantly reduced moderation toward the top of the core when the reactor is in its hot operating condition. The reduced moderation leads to slower burnup and greater conversion ratio in an upper core region so that when the reactor is in its cold shut down condition the resulting relatively increased moderation in the upper core region is accompanied by a reactivity profile that peaks in the upper core region. A fuel assembly is described comprising; a component of fissile materialmore » distributed over a substantial axial extent of the fuel assembly; and a component of neutron absorbing material having an axial distribution characterized by an enhancement in an axial zone of the fuel assembly, designated the cold shutdown control zone, corresponding to at least a portion of the axial region of the core when the cold shutdown reactivity peaks. The aggregate amount of neutron absorbing material in the cold shutdown zone of the fuel assembly is greater than the aggregate amount of neutron absorbing material in the axial zones of the fuel assembly immediately above and immediately below the cold shutdown control zone whereby the cold shutdown reactivity peak is reduced relative to the cold shutdown reactivity in the zones immediately above and immediately below the cold shutdown control zone. The cold shutdown zone has an axial extent measured from the bottom of the fuel assembly in the range between 68-88 percent of the height of the fissile material in the fuel assembly.« less
Startup of RAPID-L Lunar Base Reactor by Lithium Release Module
NASA Astrophysics Data System (ADS)
Kambe, Mitsuru
The 200 kWe uranium-nitride fueled lithium cooled fast reactor concept RAPID-L to be combined with thermoelectric power conversion system for lunar base power system is demonstrated. Unique challenges in reactivity control systems design have been attempted in RAPID-L concept. The reactor involves the following innovative reactivity control systems: Lithium Expansion Modules (LEM) for inherent reactivity feedback, Lithium Injection Modules (LIM) for inherent ultimate shutdown, and Lithium Release Modules (LRM) for automated reactor startup. All these systems adopt lithium-6 as a liquid poison instead of conventional B4C rods or Be reflectors. These systems are effective independent of the magnitude and direction of the gravity force. In 2006, however, the following design amendment has been made. 1) B4C poison rods were added to ensure criticality safety in unintended positive reactivity insertion by LRMs due to fire in the launch phase accident; because LRM freeze seal melts at 800°C which result in positive reactivity insertion. 2) Lower hot standby temperature of 200°C was adopted instead of conventional 800°C to reduce the external power at the startup. In this paper, development of the LRM orifice which dominates the startup transient of RAPID-L is discussed. An attention was focused how to achieve sufficiently small flow rate of 6Li in the orifice because it enables moderate positive reactivity insertion rate. The LRM orifice performance has been confirmed using 0.5 mm diameter SUS316 orifice/lithium flow test setup in the glove box.
30 CFR 57.8534 - Shutdown or failure of auxiliary fans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Shutdown or failure of auxiliary fans. 57.8534... Ventilation Underground Only § 57.8534 Shutdown or failure of auxiliary fans. (a) Auxiliary fans installed and... fan maintenance or fan adjustments where air quality is maintained in compliance with the applicable...
76 FR 20707 - Notice of Possible Shutdown of Investigative Activities
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... receives funding and the period of the shutdown ends, all schedules will resume starting with the day on... if the Commission resumes operations by April 14, 2011. Should the shutdown not end before April 14.... The Commission's World Wide Web site, at http://www.usitc.gov , will be updated to the extent...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2010 CFR
2010-07-01
....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2010 CFR
2010-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...
Code of Federal Regulations, 2011 CFR
2011-07-01
... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2011 CFR
2011-07-01
....5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown, and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... to you. This includes periods of startup, shutdown, and malfunction. These instances are deviations... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period of startup, shutdown, or malfunction are violations...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
Code of Federal Regulations, 2010 CFR
2010-07-01
... startup, shutdown, and malfunction. These instances are deviations from the emission limits, operating... during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the... determine whether deviations that occur during a period you identify as a startup, shutdown, or malfunction...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup...-Emission Limitations and Operating Limits § 60.2685 What happens during periods of startup, shutdown, and... startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3 hours. Effective Date...
40 CFR Table 7 to Subpart Aaaaa of... - Requirements for Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
.... If you had a startup, shutdown or malfunction during the reporting period and you took actions...) Semiannually according to the requirements in § 63.7131(b). 2. An immediate startup, shutdown, and malfunction report if you had a startup, shutdown, or malfunction during the reporting period that is not consistent...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
....6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include... you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and...
40 CFR 63.1570 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... control equipment. (d) You must develop a written startup, shutdown, and malfunction plan (SSMP) according... includes periods of startup, shutdown, and malfunction. You also must report each instance in which you did...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9641 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan... information in paragraphs (b)(7)(i) and (ii) of this section. This includes periods of startup, shutdown, and...
40 CFR 63.9814 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... beginning and ending dates of the reporting period. (4) If you had a startup, shutdown, or malfunction... (d)(1) and (2) of this section. This includes periods of startup, shutdown, and malfunction. (1) The... section. This includes periods of startup, shutdown, and malfunction. (1) The total operating time of each...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-19
..., ``Revise Shutdown Margin Definition To Address Advanced Fuel Designs'' AGENCY: Nuclear Regulatory... Shutdown Margin Definition to Address Advanced Fuel Designs.'' DATES: Comment period expires on December 19... address newer BWR fuel designs, which may be more reactive at shutdown temperatures above 68[emsp14][deg]F...
Preliminary analysis of loss-of-coolant accident in Fukushima nuclear accident
DOE Office of Scientific and Technical Information (OSTI.GOV)
Su'ud, Zaki; Anshari, Rio
Loss-of-Coolant Accident (LOCA) in Boiling Water Reactor (BWR) especially on Fukushima Nuclear Accident will be discussed in this paper. The Tohoku earthquake triggered the shutdown of nuclear power reactors at Fukushima Nuclear Power station. Though shutdown process has been completely performed, cooling process, at much smaller level than in normal operation, is needed to remove decay heat from the reactor core until the reactor reach cold-shutdown condition. If LOCA happen at this condition, it will cause the increase of reactor fuel and other core temperatures and can lead to reactor core meltdown and exposure of radioactive material to the environmentmore » such as in the Fukushima Dai Ichi nuclear accident case. In this study numerical simulation has been performed to calculate pressure composition, water level and temperature distribution on reactor during this accident. There are two coolant regulating system that operational on reactor unit 1 at this accident, Isolation Condensers (IC) system and Safety Relief Valves (SRV) system. Average mass flow of steam to the IC system in this event is 10 kg/s and could keep reactor core from uncovered about 3,2 hours and fully uncovered in 4,7 hours later. There are two coolant regulating system at operational on reactor unit 2, Reactor Core Isolation Condenser (RCIC) System and Safety Relief Valves (SRV). Average mass flow of coolant that correspond this event is 20 kg/s and could keep reactor core from uncovered about 73 hours and fully uncovered in 75 hours later. There are three coolant regulating system at operational on reactor unit 3, Reactor Core Isolation Condenser (RCIC) system, High Pressure Coolant Injection (HPCI) system and Safety Relief Valves (SRV). Average mass flow of water that correspond this event is 15 kg/s and could keep reactor core from uncovered about 37 hours and fully uncovered in 40 hours later.« less
Preliminary analysis of loss-of-coolant accident in Fukushima nuclear accident
NASA Astrophysics Data System (ADS)
Su'ud, Zaki; Anshari, Rio
2012-06-01
Loss-of-Coolant Accident (LOCA) in Boiling Water Reactor (BWR) especially on Fukushima Nuclear Accident will be discussed in this paper. The Tohoku earthquake triggered the shutdown of nuclear power reactors at Fukushima Nuclear Power station. Though shutdown process has been completely performed, cooling process, at much smaller level than in normal operation, is needed to remove decay heat from the reactor core until the reactor reach cold-shutdown condition. If LOCA happen at this condition, it will cause the increase of reactor fuel and other core temperatures and can lead to reactor core meltdown and exposure of radioactive material to the environment such as in the Fukushima Dai Ichi nuclear accident case. In this study numerical simulation has been performed to calculate pressure composition, water level and temperature distribution on reactor during this accident. There are two coolant regulating system that operational on reactor unit 1 at this accident, Isolation Condensers (IC) system and Safety Relief Valves (SRV) system. Average mass flow of steam to the IC system in this event is 10 kg/s and could keep reactor core from uncovered about 3,2 hours and fully uncovered in 4,7 hours later. There are two coolant regulating system at operational on reactor unit 2, Reactor Core Isolation Condenser (RCIC) System and Safety Relief Valves (SRV). Average mass flow of coolant that correspond this event is 20 kg/s and could keep reactor core from uncovered about 73 hours and fully uncovered in 75 hours later. There are three coolant regulating system at operational on reactor unit 3, Reactor Core Isolation Condenser (RCIC) system, High Pressure Coolant Injection (HPCI) system and Safety Relief Valves (SRV). Average mass flow of water that correspond this event is 15 kg/s and could keep reactor core from uncovered about 37 hours and fully uncovered in 40 hours later.
Planar near-nozzle velocity measurements during a single high-pressure fuel injection
NASA Astrophysics Data System (ADS)
Schlüßler, Raimund; Gürtler, Johannes; Czarske, Jürgen; Fischer, Andreas
2015-09-01
In order to reduce the fuel consumption and exhaust emissions of modern Diesel engines, the high-pressure fuel injections have to be optimized. This requires continuous, time-resolved measurements of the fuel velocity distribution during multiple complete injection cycles, which can provide a deeper understanding of the injection process. However, fuel velocity measurements at high-pressure injection nozzles are a challenging task due to the high velocities of up to 300 m/s, the short injection durations in the range and the high fuel droplet density especially near the nozzle exit. In order to solve these challenges, a fast imaging Doppler global velocimeter with laser frequency modulation (2D-FM-DGV) incorporating a high-speed camera is presented. As a result, continuous planar velocity field measurements are performed with a measurement rate of 200 kHz in the near-nozzle region of a high-pressure Diesel injection. The injection system is operated under atmospheric surrounding conditions with injection pressures up to 1400 bar thereby reaching fuel velocities up to 380 m/s. The measurements over multiple entire injection cycles resolved the spatio-temporal fluctuations of the fuel velocity, which occur especially for low injection pressures. Furthermore, a sudden setback of the velocity at the beginning of the injection is identified for various injection pressures. In conclusion, the fast measurement system enables the investigation of the complete temporal behavior of single injection cycles or a series of it. Since this eliminates the necessity of phase-locked measurements, the proposed measurement approach provides new insights for the analysis of high-pressure injections regarding unsteady phenomena.
NASA Technical Reports Server (NTRS)
Mcfadden, J. J.; Dezelick, R. A.; Barrows, R. R.
1983-01-01
Test results from a high pressure electronically controlled fuel injection system are compared with a commercial mechanical injection system on a single cylinder, diesel test engine using an inlet boost pressure of 2.6:1. The electronic fuel injection system achieved high pressure by means of a fluid intensifier with peak injection pressures of 47 to 69 MPa. Reduced exhaust emissions were demonstrated with an increasing rate of injection followed by a fast cutoff of injection. The reduction in emissions is more responsive to the rate of injection and injection timing than to high peak injection pressure.
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2011 CFR
2011-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
Code of Federal Regulations, 2014 CFR
2014-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2013 CFR
2013-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
Code of Federal Regulations, 2013 CFR
2013-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2010 CFR
2010-07-01
... reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and malfunction plan...(b)(2)(i)-(b)(2)(v) General recordkeeping requirements 63.10(d)(5) If actions taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 63.8248 - What other requirements must I meet?
Code of Federal Regulations, 2014 CFR
2014-07-01
... startup, shutdown, and malfunction. (2) You must report each instance in which you did not meet each work practice standard in § 63.8192 that applies to you. This includes periods of startup, shutdown, and... value was out of range. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR Table 14 to Subpart Wwww of... - Requirements for Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements in § 63.5910(b). c. The information in § 63.10(d)(5)(i) if you had a startup, shutdown or malfunction during the reporting period, and you took actions consistent with your startup, shutdown, and malfunction plan Semiannually according to the requirements in § 63.5910(b). 2. An immediate startup, shutdown...
40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA
Code of Federal Regulations, 2011 CFR
2011-07-01
... reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and malfunction plan...(b)(2)(i)-(b)(2)(v) General recordkeeping requirements 63.10(d)(5) If actions taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction...
Code of Federal Regulations, 2012 CFR
2012-07-01
... periods of startup, shutdown, and malfunction. These instances are deviations from the emission limits...), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
40 CFR 63.7835 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... that applies to you. This includes periods of startup, shutdown, and malfunction. You also must report...) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you demonstrate to the...
Defense.gov Special Report: Government Shutdown - What You Need to Know
Department is taking to plan for a possible government shutdown. Document Plan for Agency Operations During agencies should plan for a potential shutdown. Document Guidance for Continuation of Operations in The Contingency Plan Guidance for Continuation of Essential Operations in the Absence of Available Appropriations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... self- reporting of events that PBGC now learns of only through its own investigations and may enable... to retire sooner upon learning of a shutdown that would eliminate her job, the separation would be the result of the shutdown; whereas if (before learning of the shutdown) she had been planning to...
... back or joint pain; widening of the pupils; irritability; anxiety; weakness; stomach cramps; difficulty falling asleep or staying asleep; nausea; loss of appetite; vomiting; diarrhea; fast breathing; or fast heartbeat. Your doctor will probably decrease your dose gradually.
... back or joint pain; widening of the pupils; irritability; anxiety; weakness; stomach cramps; difficulty falling asleep or staying asleep; nausea; loss of appetite; vomiting; diarrhea; fast breathing; or fast heartbeat. Your doctor will probably decrease your dose gradually.
Fuel cell system shutdown with anode pressure control
Clingerman, Bruce J.; Doan, Tien M.; Keskula, Donald H.
2002-01-01
A venting methodology and pressure sensing and vent valving arrangement for monitoring anode bypass valve operating during the normal shutdown of a fuel cell apparatus of the type used in vehicle propulsion systems. During a normal shutdown routine, the pressure differential between the anode inlet and anode outlet is monitored in real time in a period corresponding to the normal closing speed of the anode bypass valve and the pressure differential at the end of the closing cycle of the anode bypass valve is compared to the pressure differential at the beginning of the closing cycle. If the difference in pressure differential at the beginning and end of the anode bypass closing cycle indicates that the anode bypass valve has not properly closed, a system controller switches from a normal shutdown mode to a rapid shutdown mode in which the anode inlet is instantaneously vented by rapid vents.
The phase-space dependence of fast-ion interaction with tearing modes
Heidbrink, William W.; Bardoczi, Laszlo; Collins, Cami S.; ...
2018-03-19
Modulation of various neutral beam sources probes the interaction of fast ions with tearing modes (TM) in the DIII-D tokamak. As measured by electron cyclotron emission, the (m,n) = (2,1) tearing modes have an island width of ~8 cm and change phase 180 at the q = 2 surface. (Here, m is the poloidal mode number and n is the toroidal mode number.) Deuterium neutral beam injection by six sources with differing injection geometries produces the fast ions. To study the interaction in different parts of phase space, on successive discharges, one of the six sources is modulated at 20more » Hz to populate different fast-ion orbits. The modulation only changes the island width by a few millimeters, implying that any fast-ion effect on mode stability is below detection limits. When compared to the expected signals in the absence of TM-induced transport, both the average and modulated neutron signals deviate, implying that fast-ion transport occurs in much of phase space. Fast-ion D-α (FIDA) measurements detect reductions in signal at wavelengths that are sensitive to counter-passing ions. Neutral particle analyzer data imply poor confinement of trapped fast ions. Lastly, calculations of the expected fast-ion transport that use measured TM properties successfully reproduce the data.« less
The phase-space dependence of fast-ion interaction with tearing modes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heidbrink, William W.; Bardoczi, Laszlo; Collins, Cami S.
Modulation of various neutral beam sources probes the interaction of fast ions with tearing modes (TM) in the DIII-D tokamak. As measured by electron cyclotron emission, the (m,n) = (2,1) tearing modes have an island width of ~8 cm and change phase 180 at the q = 2 surface. (Here, m is the poloidal mode number and n is the toroidal mode number.) Deuterium neutral beam injection by six sources with differing injection geometries produces the fast ions. To study the interaction in different parts of phase space, on successive discharges, one of the six sources is modulated at 20more » Hz to populate different fast-ion orbits. The modulation only changes the island width by a few millimeters, implying that any fast-ion effect on mode stability is below detection limits. When compared to the expected signals in the absence of TM-induced transport, both the average and modulated neutron signals deviate, implying that fast-ion transport occurs in much of phase space. Fast-ion D-α (FIDA) measurements detect reductions in signal at wavelengths that are sensitive to counter-passing ions. Neutral particle analyzer data imply poor confinement of trapped fast ions. Lastly, calculations of the expected fast-ion transport that use measured TM properties successfully reproduce the data.« less
Braun, Kevin L; Hapuarachchi, Suminda; Fernandez, Facundo M; Aspinwall, Craig A
2007-08-01
Here, we report the first utilization of Hadamard transform CE (HTCE), a high-sensitivity, multiplexed CE technique, with photolytic optical gating sample injection of caged fluorescent labels for the detection of biologically important amines. Previous implementations of HTCE have relied upon photobleaching optical gating sample injection of fluorescent dyes. Photolysis of caged fluorescent labels reduces the fluorescence background, providing marked enhancements in sensitivity compared to photobleaching. Application of fast Hadamard transform CE (fHTCE) for fluorescein-based dyes yields a ten-fold higher sensitivity for photolytic injections compared to photobleaching injections, due primarily to the reduced fluorescent background provided by caged fluorescent dyes. Detection limits as low as 5 pM (ca. 18 molecules per injection event) were obtained with on-column LIF detection using fHTCE in less than 25 s, with the capacity for continuous, online separations. Detection limits for glutamate and aspartate below 150 pM (1-2 amol/injection event) were obtained using photolytic sample injection, with separation efficiencies exceeding 1 x 10(6) plates/m and total multiplexed separation times as low as 8 s. These results strongly support the feasibility of this approach for high-sensitivity dynamic chemical monitoring applications.
78 FR 38739 - Standard Format and Content for Post-Shutdown Decommissioning Activities Report
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-27
...The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 of Regulatory Guide (RG) 1.185, ``Standard Format and Content for Post-shutdown Decommissioning Activities Report.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding the submission of a post-shutdown decommissioning activities report (PSDAR).
77 FR 75198 - Standard Format and Content for Post-Shutdown Decommissioning Activities Report
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-19
...The U.S. Nuclear Regulatory Commission (NRC) is issuing for public comment draft regulatory guide (DG), DG-1272, ``Standard Format and Content for Post-shutdown Decommissioning Activities Report.'' This guide describes a method that the NRC staff considers acceptable for use in complying with the Commission's requirements regarding the submission of a post-shutdown decommissioning activities report (PSDAR).
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Remote manual shutdown for internal combustion engine... for Cargo Handling § 32.50-35 Remote manual shutdown for internal combustion engine driven cargo pump on tank vessels—TB/ALL. (a) Any tank vessel which is equipped with an internal combustion engine...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2011 CFR
2011-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
40 CFR 63.9925 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... includes periods of startup, shutdown, and malfunction. You must also report each instance in which you did... § 63.9931. (b) Startups, shutdowns, and malfunctions. (1) Consistent with §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction are not violations if you...
40 CFR 63.8691 - How do I demonstrate continuous compliance with the operating limits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating limit in Table 5 to this subpart that applies to you. This includes periods of startup, shutdown... §§ 63.6(e) and 63.7(e)(1), deviations that occur during a period of startup, shutdown, or malfunction... of startup, shutdown, or malfunction are violations, according to the provisions in § 63.6(e). [68 FR...
NASA Astrophysics Data System (ADS)
Jaboulay, Jean-Charles; Brun, Emeric; Hugot, François-Xavier; Huynh, Tan-Dat; Malouch, Fadhel; Mancusi, Davide; Tsilanizara, Aime
2017-09-01
After fission or fusion reactor shutdown the activated structure emits decay photons. For maintenance operations the radiation dose map must be established in the reactor building. Several calculation schemes have been developed to calculate the shutdown dose rate. These schemes are widely developed in fusion application and more precisely for the ITER tokamak. This paper presents the rigorous-two-steps scheme implemented at CEA. It is based on the TRIPOLI-4® Monte Carlo code and the inventory code MENDEL. The ITER shutdown dose rate benchmark has been carried out, results are in a good agreement with the other participant.
Impacts of flare emissions from an ethylene plant shutdown to regional air quality
NASA Astrophysics Data System (ADS)
Wang, Ziyuan; Wang, Sujing; Xu, Qiang; Ho, Thomas
2016-08-01
Critical operations of chemical process industry (CPI) plants such as ethylene plant shutdowns could emit a huge amount of VOCs and NOx, which may result in localized and transient ozone pollution events. In this paper, a general methodology for studying dynamic ozone impacts associated with flare emissions from ethylene plant shutdowns has been developed. This multi-scale simulation study integrates process knowledge of plant shutdown emissions in terms of flow rate and speciation together with regional air-quality modeling to quantitatively investigate the sensitivity of ground-level ozone change due to an ethylene plant shutdown. The study shows the maximum hourly ozone increments can vary significantly by different plant locations and temporal factors including background ozone data and solar radiation intensity. It helps provide a cost-effective air-quality control strategy for industries by choosing the optimal starting time of plant shutdown operations in terms of minimizing the induced ozone impact (reduced from 34.1 ppb to 1.2 ppb in the performed case studies). This study provides valuable technical supports for both CPI and environmental policy makers on cost-effective air-quality controls in the future.
NASA Astrophysics Data System (ADS)
Smorodin, A. I.; Red'kin, V. V.; Frolov, Y. D.; Korobkov, A. A.; Kemaev, O. V.; Kulik, M. V.; Shabalin, O. V.
2015-07-01
A set of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment is offered. The following technologies are regarded as core technologies for the complex: cryogenic technology nitrogen for displacement of hydrogen from the cooling circuit of turbine generators, cryo blasting of the power units by dioxide granules, preservation of the shutdown power units by dehydrated air, and dismantling and severing of equipment and structural materials of power units. Four prototype systems for eco-friendly shutdown of the power units may be built on the basis of selected technologies: Multimode nitrogen cryogenic system with four subsystems, cryo blasting system with CO2 granules for thermal-mechanical and electrical equipment of power units, and compressionless air-drainage systems for drying and storage of the shutdown power units and cryo-gas system for general severing of the steam-turbine power units. Results of the research and pilot and demonstration tests of the operational units of the considered technological systems allow applying the proposed technologies and systems in the prototype systems for shutdown of the power-generating, process, capacitive, and transport equipment.
Cannon, Tracy W; Lee, Ji Youl; Somogyi, George; Pruchnic, Ryan; Smith, Christopher P; Huard, Johnny; Chancellor, Michael B
2003-11-01
To study the physiologic outcome of allogenic transplant of muscle-derived progenitor cells (MDPCs) in the denervated female rat urethra. MDPCs were isolated from muscle biopsies of normal 6-week-old Sprague-Dawley rats and purified using the preplate technique. Sciatic nerve-transected rats were used as a model of stress urinary incontinence. The experimental group was divided into three subgroups: control, denervated plus 20 microL saline injection, and denervated plus allogenic MDPCs (1 to 1.5 x 10(6) cells) injection. Two weeks after injection, urethral muscle strips were prepared and underwent electrical field stimulation. The pharmacologic effects of d-tubocurare, phentolamine, and tetrodotoxin on the urethral strips were assessed by contractions induced by electrical field stimulation. The urethral tissues also underwent immunohistochemical staining for fast myosin heavy chain and CD4-activated lymphocytes. Urethral denervation resulted in a significant decrease of the maximal fast-twitch muscle contraction amplitude to only 8.77% of the normal urethra and partial impairment of smooth muscle contractility. Injection of MDPCs into the denervated sphincter significantly improved the fast-twitch muscle contraction amplitude to 87.02% of normal animals. Immunohistochemistry revealed a large amount of new skeletal muscle fiber formation at the injection site of the urethra with minimal inflammation. CD4 staining showed minimal lymphocyte infiltration around the MDPC injection sites. Urethral denervation resulted in near-total abolishment of the skeletal muscle and partial impairment of smooth muscle contractility. Allogenic MDPCs survived 2 weeks in sciatic nerve-transected urethra with minimal inflammation. This is the first report of the restoration of deficient urethral sphincter function through muscle-derived progenitor cell tissue engineering. MDPC-mediated cellular urethral myoplasty warrants additional investigation as a new method to treat stress urinary incontinence.
Characteristics of dioxin emissions at startup and shutdown of MSW incinerators.
Tejima, Hajime; Nishigaki, Masahide; Fujita, Yasuyuki; Matsumoto, Akihiro; Takeda, Nobuo; Takaoka, Masaki
2007-01-01
Dioxin concentrations from municipal waste incinerators in Japan and elsewhere often show low concentrations that comply with legal limits (in this paper, the term "dioxin" designates WHO-TEQ: PCDD/Fs+dioxin-like PCB). However, such data is usually generated under normal steady state operational conditions, and there has been little investigation of releases occurring during startup and shutdown. It is important, therefore, to ascertain quantitatively emissions in an unsteady state (startup and shutdown) in order to correctly evaluate the relationship between emissions from a facility and the surrounding environment. The present study aimed to examine dioxin emissions of a continuously operated incinerator at startup and shutdown, and estimating the time period of greatest emission, and the processes causing dioxin generation. The startup process was divided into five stages and the shutdown into two; at each stage, dioxins in the flue gas were measured at the boiler outlet and the stack. From the concentration of dioxins and the flue gas volume at each stage, the amount of dioxins at startup and shutdown were calculated, and these were compared with that under steady state conditions. Dioxin concentration at the stack under steady state conditions was a very low level, while those at startup and shutdown were higher. In the case where dioxin concentration under a steady state is a low level like in this study, it is indicated that the total annual dioxin emission from a facility could be attributed to the startup periods.
Influence of botulinum toxin on rabbit jaw muscle activity and anatomy.
Korfage, J A M; Wang, Jeffrey; Lie, S H J T J; Langenbach, Geerling E J
2012-05-01
Muscles can adapt their fiber properties to accommodate to new conditions. We investigated the extent to which a decrease in muscle activation can cause an adaptation of fiber properties in synergistic and antagonistic jaw muscles. Three months after the injection of botulinum toxin type A in one masseter (anterior or posterior) muscle changes in fiber type composition and fiber cross-sectional areas in jaw muscles were studied at the microscopic level. The injected masseter showed a steep increase in myosin type IIX fibers, whereas fast fibers decreased by about 50% in size. Depending on the injection site, both synergistic and antagonistic muscles showed a significant increase in the size of their fast IIA fibers, sometimes combined with an increased number of IIX fibers. Silencing the activity in the masseter not only causes changes in the fibers of the injected muscle but also leads to changes in other jaw muscles. Copyright © 2012 Wiley Periodicals, Inc.
CONTROL RODS FOR NUCLEAR REACTORS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bell, F.R.
1963-01-16
A means for controlling the control rod in emergency, when it is desired to shutdown the reactor with the shortest possible delay, is described. When the emergency occurs the control rod is allowed to drop freely under gravity from the control rod support tube into the bore in the reactor core. A normal shutdown is reached almost at the lowest rod position. In the shut-down position and also below it, the control rod had its full effect of reducing the level of activity in the core. When the shut-down position was reached, a brake came into action to decelerate themore » rod and reduce shock and the likelihood of damage. (C.E.S.)« less
Inoue, Wataru; Luheshi, Giamal N
2010-12-01
A decrease in leptin levels with the onset of starvation triggers a myriad of physiological responses including immunosuppression and hypometabolism/hypothermia, both of which can counteract the fever response to pathogens. Here we examined the role of leptin in LPS-induced fever in rats that were fasted for 48 h prior to inflammation with or without leptin replacement (12 μg/day). The preinflammation fasting alone caused a progressive hypothermia that was almost completely reversed by leptin replacement. The LPS (100 μg/kg)-induced elevation in core body temperature (T(core)) was attenuated in the fasted animals at 2-6 h after the injection, an effect that was not reversed by leptin replacement. Increasing the LPS dose to 1,000 μg/kg caused a long-lasting fever that remained unabated for up to 36 h after the injection in the fed rats. This sustained response was strongly attenuated in the fasted rats whose T(core) started to decrease by 18 h after the injection. Leptin replacement almost completely restored the prolonged fever. The attenuation of the prolonged fever in the fasted animals was accompanied by the diminution of proinflammatory PGE(2) in the cerebrospinal fluid and mRNA of proopiomelanocortin (POMC) in the hypothalamus. Leptin replacement prevented the fasting-induced reduction of POMC but not PGE(2). Moreover, the leptin-dependent fever maintenance correlated closely with hypothalamic POMC levels (r = 0.77, P < 0.001). These results suggest that reduced leptin levels during starvation attenuate the sustained fever response by lowering hypothalamic POMC tone but not PGE(2) synthesis.
Computational study: Reduction of iron corrosion in lead coolant of fast nuclear reactor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Arkundato, Artoto; Su'ud, Zaki; Abdullah, Mikrajuddin
2012-06-20
In this paper we report molecular dynamics simulation results of iron (cladding) corrosion in interaction with lead coolant of fast nuclear reactor. The goal of this work is to study effect of oxygen injection to the coolant to reduce iron corrosion. By evaluating diffusion coefficients, radial distribution functions, mean-square displacement curves and observation of crystal structure of iron before and after oxygen injection, we concluded that a significant reduction of corrosion can be achieved by issuing about 2% of oxygen atoms into lead coolant.
SASSYS pretest analysis of the THORS-SHRS experiments. [LMFBR
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bordner, G.L.; Dunn, F.E.
The THORS Facility at ORNL was recently modified to allow the testing of two parallel 19-pin simulated fueled subassemblies under natural circulation conditions similar to those that might occur during a partial failure of the shutdown heat removal system (SHRS) of a liquid-metal fast breeder reactor. The planned experimental program included a series of tests at various inlet plenum temperatures to determine boiling threshold power levels and the power range for stable boiling during natural circulation operation. Pretest calculations were performed at ANL, which supplement those carried out at ORNL for the purposes of validating the SASSYS model in themore » natural circulation regime and of providing data which would be useful in planning the experiments.« less
Small-strip Thin Gap Chambers for the muon spectrometer upgrade of the ATLAS experiment
NASA Astrophysics Data System (ADS)
Perez Codina, E.; ATLAS Muon Collaboration
2016-07-01
The ATLAS muon system upgrade to be installed during the LHC long shutdown in 2018/19, the so-called New Small Wheel (NSW), is designed to cope with the increased instantaneous luminosity in LHC Run 3. The small-strip Thin Gap Chambers (sTGC) will provide the NSW with a fast trigger and high precision tracking. The construction protocol has been validated by test beam experiments on a full-size prototype sTGC detector, showing the performance requirements are met. The intrinsic spatial resolution for a single layer has been found to be about 45 μm for a perpendicular incident angle, and the transition region between pads has been measured to be about 4 mm.
Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maheras, Steven J.; Best, Ralph E.; Ross, Steven B.
A preliminary evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power plant sites was performed. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. The evaluation was divided into four components: Characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory A description of the on-site infrastructure at the shutdown sitesmore » An evaluation of the near-site transportation infrastructure and transportation experience at the shutdown sites An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF and GTCC waste were the U.S. Department of Energy (DOE) spent nuclear fuel inventory database, industry publications such as StoreFUEL, and government sources such as the U.S. Nuclear Regulatory Commission. The primary sources for information on the conditions of on-site infrastructure and near-site transportation infrastructure and experience included information collected during site visits, information provided by managers at the shutdown sites, Facility Interface Data Sheets compiled for DOE in 2005, Services Planning Documents prepared for DOE in 1993 and 1994, industry publications such as Radwaste Solutions, and Google Earth. State staff, State Regional Group representatives, a Tribal representative, and a Federal Railroad Administration representative have participated in nine of the shutdown site visits. Every shutdown site was found to have at least one off-site transportation mode option for removing its SNF and GTCC waste; some have multiple options. Experience removing large components during reactor decommissioning provided an important source of information used to identify the transportation mode options for the sites. Especially important in conducting the evaluation were site visits, through which information was obtained that would not have been available otherwise. Extensive photographs taken during the site visits proved to be particularly useful in documenting the current conditions at or near the sites. Additional conclusions from this evaluation include: The 13 shutdown sites use designs from 4 different suppliers involving 11 different (horizontal and vertical) dry storage systems that would require the use of 9 different transportation cask designs to remove the SNF and GTCC waste from the shutdown sites. Although some changes to transportation certificates of compliance will be required, the SNF at the initial 9 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion) is in dual purpose dry storage canisters that can be transported, including a small amount of high-burnup fuel. Most sites indicated that 2-3 years of advance time would be required for its preparations before shipments could begin. Some sites could be ready in less time. As additional sites such as Fort Calhoun, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.« less
NASA Astrophysics Data System (ADS)
Zeng, Qiusun; Chen, Dehong; Wang, Minghuang
2017-12-01
In order to improve the fusion energy gain (Q) of a gas dynamic trap (GDT)-based fusion neutron source, a method in which the neutral beam is obliquely injected at a higher magnetic field position rather than at the mid-plane of the GDT is proposed. This method is beneficial for confining a higher density of fast ions at the turning point in the zone with a higher magnetic field, as well as obtaining a higher mirror ratio by reducing the mid-plane field rather than increasing the mirror field. In this situation, collision scattering loss of fast ions with higher density will occur and change the confinement time, power balance and particle balance. Using an updated calculation model with high-field neutral beam injection for a GDT-based fusion neutron source conceptual design, we got four optimal design schemes for a GDT-based fusion neutron source in which Q was improved to two- to three-fold compared with a conventional design scheme and considering the limitation for avoiding plasma instabilities, especially the fire-hose instability. The distribution of fast ions could be optimized by building a proper magnetic field configuration with enough space for neutron shielding and by multi-beam neutral particle injection at different axial points.
Wu, Hui; Xu, Xiao; Meng, Ying; Xia, Fangzhen; Zhai, Hualing; Lu, Yingli
2014-01-01
Objective. Blood glucose concentrations of type 1 diabetic rats are vulnerable, especially to stress and trauma. The present study aimed to investigate the fasting endogenous glucose production and skeletal muscle glucose uptake of Streptozotocin induced type 1 diabetic rats using an unstressed vein and artery implantation of catheters at the tails of the rats as a platform. Research Design and Methods. Streptozotocin (65 mg·kg−1) was administered to induce type 1 diabetic state. The unstressed approach of catheters of vein and artery at the tails of the rats was established before the isotope tracer injection. Dynamic measurement of fasting endogenous glucose production was assessed by continuously infusing stable isotope [6, 6-2H2] glucose, while skeletal muscle glucose uptake by bolus injecting radioactively labeled [1-14C]-2-deoxy-glucose. Results. Streptozotocin induced type 1 diabetic rats displayed polydipsia, polyphagia, and polyuria along with overt hyperglycemia and hypoinsulinemia. They also had enhanced fasting endogenous glucose production and reduced glucose uptake in skeletal muscle compared to nondiabetic rats. Conclusions. The dual catheters implantation at the tails of the rats together with isotope tracers injection is a save time, unstressed, and feasible approach to explore the glucose metabolism in animal models in vivo. PMID:24772449
Busch, Stephen; Miles, Paul C.
2015-03-31
A Moehwald HDA (HDA is a German acronym: Hydraulischer Druckanstieg: hydraulic pressure increase) injection quantity and rate measuring unit is used to investigate injection rates obtained with a fast-acting, preproduction diesel solenoid injector. Experimental parametric variations are performed to determine their impact on measured injection rate traces. A pilot–main injection strategy is investigated for various dwell times; these preproduction injectors can operate with very short dwell times with distinct pilot and main injection events. Dwell influences the main injection rate shape. Furthermore, a comparison between a diesel-like fuel and a gasoline-like fuel shows that injection rates are comparable for amore » single injection but dramatically different for multiple injections with short dwells.« less
Oishi, Yasuharu; Roy, Roland R; Ogata, Tomonori; Ohira, Yoshinobu
2015-12-01
We investigated heat-stress effects on the adult myosin heavy chain (MyHC) profile of soleus muscle fibers at an early stage of regeneration. Regenerating fibers in adult rats were analyzed 2, 4, or 6 days after bupivacaine injection. Rats were heat stressed by immersion in water (42 ± 1°C) for 30 minutes 24 hours after bupivacaine injection and every other day thereafter. No adult MyHC isoforms were observed after 2 days, whereas some fibers expressed only fast MyHC after 4 days. Heat stress increased fast and slow MyHC in regenerating fibers after 6 days. Regenerating fibers expressing only slow MyHC were observed only in heat-stressed muscles. Bupivacaine injection increased the number of Pax7(+) and MyoD(+) satellite cells in regenerating fibers, more so in heat-stressed rats. The results indicate that heat stress accelerates fast-to-slow MyHC phenotype conversion in regenerating fibers via activation of satellite cells. © 2015 Wiley Periodicals, Inc.
The Caltech experimental investigation of fast 3D non-equilbrium dynamics: an overview
NASA Astrophysics Data System (ADS)
Bellan, Paul; Shikama, Taiichi; Chai, Kilbyoung; Ha, Bao; Chaplin, Vernon; Kendall, Mark; Moser, Auna; Stenson, Eve; Tobin, Zachary; Zhai, Xiang
2012-10-01
The formation and dynamics of writhing, plasma-filled, twisted open magnetic flux tubes is being investigated using pulsed-power laboratory experiments. This work is relevant to solar corona loops, astrophysical jets, spheromak formation, and open field lines in tokamaks and RFP's. MHD forces have been observed to drive fast axial plasma flows into the flux tube from the boundary it intercepts. These flows fill the flux tube with plasma while simultaneously injecting linked frozen-in azimuthal flux; helicity injection is thus associated with mass injection. Recent results include observation of a secondary instability (Rayleigh-Taylor driven by the effective gravity of an exponentially growing kink mode), color-coded plasmas manifesting bidirectional axial flows in a geometry similar to a solar corona loop, and spectroscopic measurements of the internal vector magnetic field. Experiments underway include investigating how an external magnetic field straps down a solar loop, investigation of the details of the Rayleigh-Taylor instability, development of a fast EUV movie camera, increasing the jet velocity, excitation of Alfven waves, and investigating 3D magnetic reconnection.
Static Stress Transfers Causes Delayed Seismicity Shutdown
NASA Astrophysics Data System (ADS)
Kroll, K.; Richards-Dinger, K. B.; Dieterich, J. H.; Cochran, E. S.
2015-12-01
It has been long debated what role static stress changes play in the enhancement and suppression of seismicity in the near-field region of large earthquakes. While numerous observations have correlated earthquake triggering and elevated seismicity rates with regions of increased Coulomb failure stress (CFS), observations of seismic quiescence in stress shadow regions are more controversial. When observed, seismicity shutdowns are often delayed by days to months following a negative stress perturbation. Some studies propose that the delay in the seismic shutdown can be caused by rupture promoting failure on one fault type while suppressing activity on another; thus the observed seismicity reflects the weighted contribution of the two faulting populations. For example, it was noted that in the 75 years following the 1906 San Francisco earthquake, strike-slip faulting earthquakes were inhibited, while thrust faulting events were promoted. However, definitive observations supporting this delayed shutdown mechanism are rare. In this study, we report seismicity rate increases and decreases that correlate with regions of Coulomb stress transfer, and show observations of a delayed shutdown in the Yuha Desert, California. We use a Coulomb stress change model coupled with a rate-and state- earthquake model to show that the delay in the shutdown is due to the combined changes in the rates of normal and strike-slip faulting events following the 2010 M5.72 Ocotillo aftershock of the 2010 El Mayor-Cucapah earthquake.
Multiple well-shutdown tests and site-scale flow simulation in fractured rocks
Tiedeman, Claire; Lacombe, Pierre J.; Goode, Daniel J.
2010-01-01
A new method was developed for conducting aquifer tests in fractured-rock flow systems that have a pump-and-treat (P&T) operation for containing and removing groundwater contaminants. The method involves temporary shutdown of individual pumps in wells of the P&T system. Conducting aquifer tests in this manner has several advantages, including (1) no additional contaminated water is withdrawn, and (2) hydraulic containment of contaminants remains largely intact because pumping continues at most wells. The well-shutdown test method was applied at the former Naval Air Warfare Center (NAWC), West Trenton, New Jersey, where a P&T operation is designed to contain and remove trichloroethene and its daughter products in the dipping fractured sedimentary rocks underlying the site. The detailed site-scale subsurface geologic stratigraphy, a three-dimensional MODFLOW model, and inverse methods in UCODE_2005 were used to analyze the shutdown tests. In the model, a deterministic method was used for representing the highly heterogeneous hydraulic conductivity distribution and simulations were conducted using an equivalent porous media method. This approach was very successful for simulating the shutdown tests, contrary to a common perception that flow in fractured rocks must be simulated using a stochastic or discrete fracture representation of heterogeneity. Use of inverse methods to simultaneously calibrate the model to the multiple shutdown tests was integral to the effectiveness of the approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katchadjian, Pablo, E-mail: katcha@cnea.gov.ar; Desimone, Carlos, E-mail: katcha@cnea.gov.ar; Garcia, Alejandro, E-mail: katcha@cnea.gov.ar
Embalse Nuclear Power Plant (CNE) (CANDU design) is reaching its end of life and due to elapsed operating time the problem of deformation by accelerated creep occurs in the pressure tubes (PT), leading to a possible contact between calandria tubes (CT), concentric to the PT, and some Liquid Injection Shutdown System (LISS) nozzles that pass underneath them. With determination of CT wear, after the predicted contact occurs, the wear rate of the TC could be determined and thus take less conservative measures over the remaining life of the component. This paper presents the development of an ultrasonic technique for measuringmore » wear in CT, with nominal thickness of 1.34 mm. Because the only access is through the interior of PT, to perform this measurement it is necessary to pass through three different interfaces.« less
Design and operation of a fast electromagnetic inductive massive gas injection valve for NSTX-U.
Raman, R; Jarboe, T R; Nelson, B A; Gerhardt, S P; Lay, W-S; Plunkett, G J
2014-11-01
Results from the operation of an electromagnetic valve, that does not incorporate ferromagnetic materials, are presented. Image currents induced on a conducting disc placed near a pancake solenoid cause it to move away from the solenoid and open the vacuum seal. A new and important design feature is the use of Lip Seals for the sliding piston. The pressure rise in the test chamber is measured directly using a fast time response Baratron gauge. The valve injects over 200 Torr l of nitrogen in less than 3 ms, which remains unchanged at moderate magnetic fields.
Design and operation of a fast electromagnetic inductive massive gas injection valve for NSTX-U
NASA Astrophysics Data System (ADS)
Raman, R.; Jarboe, T. R.; Nelson, B. A.; Gerhardt, S. P.; Lay, W.-S.; Plunkett, G. J.
2014-11-01
Results from the operation of an electromagnetic valve, that does not incorporate ferromagnetic materials, are presented. Image currents induced on a conducting disc placed near a pancake solenoid cause it to move away from the solenoid and open the vacuum seal. A new and important design feature is the use of Lip Seals for the sliding piston. The pressure rise in the test chamber is measured directly using a fast time response Baratron gauge. The valve injects over 200 Torr l of nitrogen in less than 3 ms, which remains unchanged at moderate magnetic fields.
Startup, Shutdown, & Malfunction (SSM) Emissions
EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.
HIGH-SPEED GC/MS FOR AIR ANALYSIS
High speed or fast gas chromatography (FGC) consists of narrow bandwidth injection into a high-speed carrier gas stream passing through a short column leading to a fast detector. Many attempts have been made to demonstrate FGC, but until recently no practical method for routin...
Ubiquitous healthy diatoms in the deep sea confirm deep carbon injection by the biological pump
Agusti, S.; González-Gordillo, J. I.; Vaqué, D.; Estrada, M.; Cerezo, M. I.; Salazar, G.; Gasol, J. M.; Duarte, C. M.
2015-01-01
The role of the ocean as a sink for CO2 is partially dependent on the downward transport of phytoplankton cells packaged within fast-sinking particles. However, whether such fast-sinking mechanisms deliver fresh organic carbon down to the deep bathypelagic sea and whether this mechanism is prevalent across the ocean requires confirmation. Here we report the ubiquitous presence of healthy photosynthetic cells, dominated by diatoms, down to 4,000 m in the deep dark ocean. Decay experiments with surface phytoplankton suggested that the large proportion (18%) of healthy photosynthetic cells observed, on average, in the dark ocean, requires transport times from a few days to a few weeks, corresponding to sinking rates (124–732 m d−1) comparable to those of fast-sinking aggregates and faecal pellets. These results confirm the expectation that fast-sinking mechanisms inject fresh organic carbon into the deep sea and that this is a prevalent process operating across the global oligotrophic ocean. PMID:26158221
NUMBER AND TYPE OF OPERATING CYCLES FOR THE FFTF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyd, D. C.
1969-05-15
The choice of materials and other vessel design decisions necessary to provide the desired life expectancy for the FTR vessel are partially dependent upon estimates of the number and type of reactor shutdowns and startups which may be anticipated. Current estimates of these so-called "cycles" are given, including scram frequency, experimental outage frequency, standard shutdowns and startups, and rapid controlled shutdowns. Also discussed are abnormal heatup or cooldown, and tentative goals for temperature controls. MTR, ETR, and typical PRTR operating histories are tabulated.
Luna, M; Gastone, F; Tosco, T; Sethi, R; Velimirovic, M; Gemoets, J; Muyshondt, R; Sapion, H; Klaas, N; Bastiaens, L
2015-10-01
The paper reports a pilot injection test of microsized zerovalent iron (mZVI) dispersed in a guar gum shear thinning solution. The test was performed in the framework of the EU research project AQUAREHAB in a site in Belgium contaminated by chlorinated aliphatic hydrocarbons (CAHs). The field application was aimed to overcome those critical aspects which hinder mZVI field injection, mainly due to the colloidal instability of ZVI-based suspensions. The iron slurry properties (iron particles size and concentration, polymeric stabilizer type and concentration, slurry viscosity) were designed in the laboratory based on several tests (reactivity tests towards contaminants, sedimentation tests and rheological measurements). The particles were delivered into the aquifer through an injection well specifically designed for controlled-pressure delivery (approximately 10 bars). The well characteristics and the critical pressure of the aquifer (i.e. the injection pressure above which fracturing occurs) were assessed via two innovative injection step rate tests, one performed with water and the other one with guar gum. Based on laboratory and field preliminary tests, a flow regime at the threshold between permeation and preferential flow was selected for mZVI delivery, as a compromise between the desired homogeneous distribution of the mZVI around the injection point (ensured by permeation flow) and the fast and effective injection of the slurry (guaranteed by high discharge rates and injection pressure, resulting in the generation of preferential flow paths). A monitoring setup was designed and installed for the real-time monitoring of relevant parameters during injection, and for a fast determination of the spatial mZVI distribution after injection via non-invasive magnetic susceptibility measurements. Copyright © 2015 Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bourcier, William L.; Roberts, Sarah K.; Roberts, Jeffery J.
A system for blocking fast flow paths in geological formations includes preparing a solution of colloidal silica having a nonviscous phase and a solid gel phase. The solution of colloidal silica is injected into the geological formations while the solution of colloidal silica is in the nonviscous phase. The solution of colloidal silica is directed into the fast flow paths and reaches the solid gel phase in the fast flow paths thereby blocking flow of fluid in the fast paths.
Sadek, Km; Saleh, Ea
2014-12-01
Fasting has been recently discovered to improve overall health, but its beneficial effects in the presence of hepatic insufficiency have not been proven. The influence of fasting on the metabolism, immunological aspects, and oxidative stress of 40 male carbon tetrachloride (CCl4)-intoxicated Wistar rats was investigated in the present study. The rats were divided into four groups, including a placebo group, CCl4-intoxicated rats, which were injected subcutaneously with 1.0 ml/kg of CCl4 solution, a fasting group, which was fasted 12 h/day for 30 days, and a fourth group, which was injected with CCl4 and fasted. The metabolism, immunity, and oxidative stress improved in CCl4-intoxicated rats fasted for 12 h/day for 30 days, as evidenced in significant increase (p < 0.05) in total protein, globulin, immunoglobulin M (IgM) and IgG levels, and total antioxidant capacity. In contrast, significant decrease (p < 0.05) in blood glucose, total cholesterol, low-density lipoprotein-cholesterol, alanine aminotransferase, C-reactive protein, and malondialdehyde levels were observed. Compared with CCl4-intoxicated rats, significant differences in the albumin, triacylglycerol, high-density lipoprotein-cholesterol, very low-density lipoprotein-cholesterol, cardiovascular risk factor, calcium and magnesium levels were not detected. The results of the present study showed that fasting improved metabolism, immunity, and oxidative stress in CCl4-intoxicated rats. Thus, fasting during Ramadan is safe for patients with hepatic disorders, as the prophet Mohammed (S) said "Keep the fast, keep your health". © The Author(s) 2014.
Task 4 completion report for 40 Kilowatt grid connected modification contract
NASA Technical Reports Server (NTRS)
Vogt, J. H.
1983-01-01
Startup, operation in grid connect mode, shutdown from grid connects, operation in isolated mode, shutdown from isolated mode, steady state operation, mode transfers, and voltage disconnects are addressed.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
...; Excess Emissions During Startup, Shutdown, Maintenance, and Malfunction Activities AGENCY: Environmental...; Texas; Excess Emissions During Startup, Shutdown, Maintenance, and Malfunction Activities.'' As...
NASA Astrophysics Data System (ADS)
Liu, Long; Liu, Wei
2018-04-01
A forward modeling and inversion algorithm is adopted in order to determine the water injection plan in the oilfield water injection network. The main idea of the algorithm is shown as follows: firstly, the oilfield water injection network is inversely calculated. The pumping station demand flow is calculated. Then, forward modeling calculation is carried out for judging whether all water injection wells meet the requirements of injection allocation or not. If all water injection wells meet the requirements of injection allocation, calculation is stopped, otherwise the demand injection allocation flow rate of certain step size is reduced aiming at water injection wells which do not meet requirements, and next iterative operation is started. It is not necessary to list the algorithm into water injection network system algorithm, which can be realized easily. Iterative method is used, which is suitable for computer programming. Experimental result shows that the algorithm is fast and accurate.
Startup, Shutdown, & Malfunction (SSM) Emissions at Industrial Facilities
EPA issued a final action to ensure states have plans in place that are fully consistent with the Clean Air Act and recent court decisions concerning startup, shutdown and malfunction (SSM) operations.
Staged venting of fuel cell system during rapid shutdown
Clingerman, Bruce J.; Doan, Tien M.; Keskula, Donald H.
2002-01-01
A venting methodology and system for rapid shutdown of a fuel cell apparatus of the type used in a vehicle propulsion system. H.sub.2 and air flows to the fuel cell stack are slowly bypassed to the combustor upon receipt of a rapid shutdown command. The bypass occurs over a period of time (for example one to five seconds) using conveniently-sized bypass valves. Upon receipt of the rapid shutdown command, the anode inlet of the fuel cell stack is instantaneously vented to a remote vent to remove all H.sub.2 from the stack. Airflow to the cathode inlet of the fuel cell stack gradually diminishes over the bypass period, and when the airflow bypass is complete the cathode inlet is also instantaneously vented to a remote vent to eliminate pressure differentials across the stack.
Staged venting of fuel cell system during rapid shutdown
Keskula, Donald H.; Doan, Tien M.; Clingerman, Bruce J.
2004-09-14
A venting methodology and system for rapid shutdown of a fuel cell apparatus of the type used in a vehicle propulsion system. H.sub.2 and air flows to the fuel cell stack are slowly bypassed to the combustor upon receipt of a rapid shutdown command. The bypass occurs over a period of time (for example one to five seconds) using conveniently-sized bypass valves. Upon receipt of the rapid shutdown command, the anode inlet of the fuel cell stack is instantaneously vented to a remote vent to remove all H.sub.2 from the stack. Airflow to the cathode inlet of the fuel cell stack gradually diminishes over the bypass period, and when the airflow bypass is complete the cathode inlet is also instantaneously vented to a remote vent to eliminate pressure differentials across the stack.
Dioxins from medical waste incineration: Normal operation and transient conditions.
Chen, Tong; Zhan, Ming-xiu; Yan, Mi; Fu, Jian-ying; Lu, Sheng-yong; Li, Xiao-dong; Yan, Jian-hua; Buekens, Alfons
2015-07-01
Polychlorinated dibenzo-p-dioxins (PCDDs) and polychlorinated dibenzofurans (PCDFs) are key pollutants in waste incineration. At present, incinerator managers and official supervisors focus only on emissions evolving during steady-state operation. Yet, these emissions may considerably be raised during periods of poor combustion, plant shutdown, and especially when starting-up from cold. Until now there were no data on transient emissions from medical (or hospital) waste incineration (MWI). However, MWI is reputed to engender higher emissions than those from municipal solid waste incineration (MSWI). The emission levels in this study recorded for shutdown and start-up, however, were significantly higher: 483 ± 184 ng Nm(-3) (1.47 ± 0.17 ng I-TEQ Nm(-3)) for shutdown and 735 ng Nm(-3) (7.73 ng I-TEQ Nm(-3)) for start-up conditions, respectively. Thus, the average (I-TEQ) concentration during shutdown is 2.6 (3.8) times higher than the average concentration during normal operation, and the average (I-TEQ) concentration during start-up is 4.0 (almost 20) times higher. So monitoring should cover the entire incineration cycle, including start-up, operation and shutdown, rather than optimised operation only. This suggestion is important for medical waste incinerators, as these facilities frequently start up and shut down, because of their small size, or of lacking waste supply. Forthcoming operation should shift towards much longer operating cycles, i.e., a single weekly start-up and shutdown. © The Author(s) 2015.
Quick release latch for reactor scram
Johnson, Melvin L.; Shawver, Bruce M.
1976-01-01
A simple, reliable, and fast-acting means for releasing a control element and allowing it to be inserted rapidly into the core region of a nuclear reactor for scram purposes. A latch mechanism grips a coupling head on a nuclear control element to connect the control element to the control drive assembly. The latch mechanism is closed by tensioning a cable or rod with an actuator. The control element is released by de-energizing the actuator, providing fail-safe, rapid release of the control element to effect reactor shutdown. A sensing rod provides indication that the control element is properly positioned in the latch. Two embodiments are illustrated, one involving a collet-type latch mechanism, the other a pliers-type latch mechanism with the actuator located inside the reactor vessel.
Unsteady heat transfer performance of heat pipe with axially swallow-tailed microgrooves
NASA Astrophysics Data System (ADS)
Zhang, R. P.
2017-04-01
A mathematical model is developed for predicting the transient heat transfer and fluid flow of heat pipe with axially swallow-tailed microgrooves. The effects of liquid convective heat transfer in the microgrooves, liquid-vapor interfacial phase-change heat transfer and liquid-vapor interfacial shear stress are accounted for in the present model. The coupled non-linear control equations are solved numerically. Mass flow rate at the interface is obtained from the application of kinetic theory. Time variation of wall temperature is studied from the initial startup to steady state. The numerical results are verified by experiments. Time constants for startup and shutdown operation are defined to determine how fast a heat pipe responds to an applied input heat flux, which slightly decreases with increasing heat load.
Quick release latch for reactor scram
Johnson, M.L.; Shawver, B.M.
1975-09-16
A simple, reliable, and fast-acting means for releasing a control element and allowing it to be inserted rapidly into the core region of a nuclear reactor for scram purposes is described. A latch mechanism grips a coupling head on a nuclear control element to connect the control element to the control drive assembly. The latch mechanism is closed by tensioning a cable or rod with an actuator. The control element is released by de-energizing the actuator, providing fail-safe, rapid release of the control element to effect reactor shutdown. A sensing rod provides indication that the control element is properly positioned in the latch. Two embodiments are illustrated, one involving a collet- type latch mechanism, the other a pliers-type latch mechanism with the actuator located inside the reactor vessel. (auth)
NASA Astrophysics Data System (ADS)
Pei, Youbin; Xiang, Nong; Hu, Youjun; Todo, Y.; Li, Guoqiang; Shen, Wei; Xu, Liqing
2017-03-01
Kinetic-MagnetoHydroDynamic hybrid simulations are carried out to investigate fishbone modes excited by fast ions on the Experimental Advanced Superconducting Tokamak. The simulations use realistic equilibrium reconstructed from experiment data with the constraint of the q = 1 surface location (q is the safety factor). Anisotropic slowing down distribution is used to model the distribution of the fast ions from neutral beam injection. The resonance condition is used to identify the interaction between the fishbone mode and the fast ions, which shows that the fishbone mode is simultaneously in resonance with the bounce motion of the trapped particles and the transit motion of the passing particles. Both the passing and trapped particles are important in destabilizing the fishbone mode. The simulations show that the mode frequency chirps down as the mode reaches the nonlinear stage, during which there is a substantial flattening of the perpendicular pressure of fast ions, compared with that of the parallel pressure. For passing particles, the resonance remains within the q = 1 surface, while, for trapped particles, the resonant location moves out radially during the nonlinear evolution. In addition, parameter scanning is performed to examine the dependence of the linear frequency and growth rate of fishbones on the pressure and injection velocity of fast ions.
Improved refractory performance through partnership
DOE Office of Scientific and Technical Information (OSTI.GOV)
Linck, F.E.; Peters, D.
1995-12-31
From the early designs and construction of Circulating Fluidized Bed (CFB) boilers, many improvements have been made based upon observations of performance. Included in these improvements have been the refractory linings. The early refractory linings were subjected to extreme fluctuations in temperatures as the units experienced up and down conditions. As the designs were improved refractory failures were mostly due to the operating conditions and other mechanical stresses rather than continual shutdowns and startups. More recent problems observed with refractory linings are localized areas of high erosion, corrosion and cracking which result in hot spots and eventual shutdowns for repair.more » Today the objective of refractory suppliers and installers is to strive towards planned shutdowns rather than emergency shutdowns. This can be accomplished through partnerships between operations, material suppliers and installers. In essence, the concept is a cooperative effort between these groups to solve the variety of refractory problems in order to achieve longer refractory lining performance and less chance for emergency shutdowns. The reliability of the refractory lining is dependent on the successful combination of the material selected, proper design and the installation of the refractory material. Where these three elements combine, the lining has the best chance of performing its intended purpose.« less
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... to you at all times except during startup, shutdown, and malfunctions. (b) If you must comply with... times including during startup, shutdown, and malfunction. Testing and Initial Compliance Requirements ...
Depletion of penicillin G residues in sows after intramuscular injection
USDA-ARS?s Scientific Manuscript database
In 2011, the Food Safety Inspection Service (FSIS) switched from using the Fast Antimicrobial Screen Test (FAST) for screening animal tissues for penicillin to using the Charm-Kidney Inhibition Swab test (KIS). The switch provided a quicker test and lower detection limits for penicillin when used o...
PRA (Probabilistic Risk Assessment) Applications Program for inspection at Oconee Unit 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gore, B.F.; Vo, T.V.; Harris, M.S.
1987-10-01
The extensive Oconee-3 PRA performed by EPRI has been analyzed to identify plant systems and components important to minimizing public risk, and to identify the primary failure modes of these components. This information has been tabulated, and correlated with inspection modules from the NRC Inspection and Enforcement Manual. The report presents a series of tables, organized by system and prioritized by public risk (in person-rem per year), which identify components associated with 98% of the inspectable risk due to plant operation. External events (earthquakes, tornadoes, fires and floods) are not addressed because inspections cannot directly minimize the risks from thesemore » events; however, flooding caused by the breach of internal systems is addressed. The systems addressed, in descending order of risk importance, are: Reactor Building Spray, R B Cooling, Condenser Circulating Water, Safety Relief Valves, Low Pressure Injection, Standby Shutdown Facility-High Pressure Injection, Low-Pressure Service Water, and Emergency Feedwater. This ranking is based on the Fussel-Vesely measure of risk importance, i.e., the fraction of the total risk which involves failures of the system of interest. 8 refs., 25 tabs.« less
Shutdown system for a nuclear reactor
Groh, E.F.; Olson, A.P.; Wade, D.C.; Robinson, B.W.
1984-06-05
An ultimate shutdown system is provided for termination of neutronic activity in a nuclear reactor. The shutdown system includes bead chains comprising spherical containers suspended on a flexible cable. The containers are comprised of mating hemispherical shells which provide a ruggedized enclosure for reactor poison material. The bead chains, normally suspended above the reactor core on storage spools, are released for downward travel upon command from an external reactor monitor. The chains are capable of horizontal movement, so as to flow around obstructions in the reactor during their downward motion. 8 figs.
Shutdown system for a nuclear reactor
Groh, Edward F.; Olson, Arne P.; Wade, David C.; Robinson, Bryan W.
1984-01-01
An ultimate shutdown system is provided for termination of neutronic activity in a nuclear reactor. The shutdown system includes bead chains comprising spherical containers suspended on a flexible cable. The containers are comprised of mating hemispherical shells which provide a ruggedized enclosure for reactor poison material. The bead chains, normally suspended above the reactor core on storage spools, are released for downward travel upon command from an external reactor monitor. The chains are capable of horizontal movement, so as to flow around obstructions in the reactor during their downward motion.
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2011 CFR
2011-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2012 CFR
2012-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
40 CFR 62.14413 - When do the emission limits and stack opacity requirements apply?
Code of Federal Regulations, 2010 CFR
2010-07-01
... all times except during periods of startup, shutdown, or malfunction, provided that no hospital waste or medical/infectious waste is charged to your HMIWI during periods of startup, shutdown, or...
NASA Astrophysics Data System (ADS)
Katchadjian, Pablo; Desimone, Carlos; Garcia, Alejandro; Antonaccio, Carlos; Schroeter, Fernando; Molina, Héctor
2015-03-01
Embalse Nuclear Power Plant (CNE) (CANDU design) is reaching its end of life and due to elapsed operating time the problem of deformation by accelerated creep occurs in the pressure tubes (PT), leading to a possible contact between calandria tubes (CT), concentric to the PT, and some Liquid Injection Shutdown System (LISS) nozzles that pass underneath them. With determination of CT wear, after the predicted contact occurs, the wear rate of the TC could be determined and thus take less conservative measures over the remaining life of the component. This paper presents the development of an ultrasonic technique for measuring wear in CT, with nominal thickness of 1.34 mm. Because the only access is through the interior of PT, to perform this measurement it is necessary to pass through three different interfaces.
Geothermal production and reduced seismicity: Correlation and proposed mechanism
NASA Astrophysics Data System (ADS)
Cardiff, Michael; Lim, David D.; Patterson, Jeremy R.; Akerley, John; Spielman, Paul; Lopeman, Janice; Walsh, Patrick; Singh, Ankit; Foxall, William; Wang, Herbert F.; Lord, Neal E.; Thurber, Clifford H.; Fratta, Dante; Mellors, Robert J.; Davatzes, Nicholas C.; Feigl, Kurt L.
2018-01-01
At Brady Hot Springs, a geothermal field in Nevada, heated fluids have been extracted, cooled, and re-injected to produce electrical power since 1992. Analysis of daily pumping records and catalogs of microseismicity between 2010 and 2015 indicates a statistically significant correlation between days when the daily volume of production was at or above its long-term average rate and days when no seismic event was detected. Conversely, shutdowns in pumping for plant maintenance correlate with increased microseismicity. We hypothesize that the effective stress in the subsurface has adapted to the long-term normal operations (deep extraction) at the site. Under this hypothesis, extraction of fluids inhibits fault slip by increasing the effective stress on faults; in contrast, brief pumping cessations represent times when effective stress is decreased below its long-term average, increasing the likelihood of microseismicity.
SAPS/SAID revisited: A causal relation to the substorm current wedge
NASA Astrophysics Data System (ADS)
Mishin, Evgeny; Nishimura, Yukitoshi; Foster, John
2017-08-01
We present multispacecraft observations of enhanced flow/electric field channels in the inner magnetosphere and conjugate subauroral ionosphere, i.e., subauroral polarization streams (SAPS) near dusk and subauroral ion drifts (SAID) near midnight. The channels collocate with ring current (RC) injections lagging the onset of substorms by a few to ˜20 min, i.e., significantly shorter than the gradient-curvature drift time of tens of keV ions. The time lag is of the order of the propagation time of reconnection-injected hot plasma jets to the premidnight plasmasphere and the substorm current wedge (SCW) to dusk. The observations confirm and expand on the previous results on the SAID features that negate the paradigm of voltage and current generators. Fast-time duskside SAPS/RC injections appear intimately related to a two-loop circuit of the substorm current wedge (SCW2L). We suggest that the poleward electric field inherent in the SCW2L circuit, which demands closure of the Region 1 and Region 2 sense field-aligned currents via meridional currents, is the ultimate cause of fast RC injections and SAPS on the duskside.
SAID/SAPS Revisited: A Causal Relation to the Substorm Current Wedge
NASA Astrophysics Data System (ADS)
Mishin, E. V.
2017-12-01
We present multi-spacecraft observations of enhanced flow/electric field channels in the inner magnetosphere and conjugate subauroral ionosphere, i.e., subauroral polarization streams (SAPS) near dusk and subauroral ion drifts (SAID) near midnight. The channels collocate with ring current (RC) injections lagging the onset of substorms by a few to ˜20 minutes, i.e., significantly shorter than the gradient-curvature drift time of tens of keV ions. The time lag is of the order of the propagation time of reconnection-injected hot plasma jets to the premidnight plasmasphere and the substorm current wedge (SCW) to dusk. The observations confirm and expand on the previous results on the SAID features that negate the paradigm of voltage and current generators. Fast-time duskside SAPS/RC injections appear intimately related to a two-loop circuit of the substorm current wedge (SCW2L). We suggest that the poleward electric field inherent in the SCW2L circuit, which demands closure of the Region 1- and Region 2-sense field-aligned currents via meridional currents, is the ultimate cause of fast RC injections and SAPS on the duskside.
Display-And-Alarm Circuit For Accelerometer
NASA Technical Reports Server (NTRS)
Bozeman, Richard J., Jr.
1995-01-01
Compact accelerometer assembly consists of commercial accelerometer retrofit with display-and-alarm circuit. Provides simple means for technician attending machine to monitor vibrations. Also simpifies automatic safety shutdown by providing local alarm or shutdown signal when vibration exceeds preset level.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
....m. in the Pentagon. Due to weather conditions and a federal government shutdown, the scheduled March... weather conditions and a federal government shutdown, the scheduled March 6, 2013 Board meeting is...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
40 CFR 63.6105 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitations which apply to you at all times except during startup, shutdown, and malfunctions. (b) If you must... emissions at all times including during startup, shutdown, and malfunction. Testing and Initial Compliance...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mosier, M.A.; Jansons, R.A.; Mosier, H.D. Jr.
The effect of a 48 hour fast on sulfate incorporation of corneal mucopolysaccharides was investigated in the rat. After fasting for 24 hours, experimental and control rats were injected intraperitoneally with /sup 35/S-sulfate. After fasting an additional 24 hours, the rats were sacrificed and incorporation of the label into the acid mucopolysaccharide fraction of the cornea was determined. Incorporation of the label into the acid mucopolysaccharide fraction was significantly increased in the fasted rat cornea. Increased synthesis of corneal sulfated mucopolysaccharides during fasting in the rat contrasts with the well known decreased synthesis in cartilage under the same conditions. Thesemore » findings suggest that corneal acid mucopolysaccharide synthesis is selectively preserved and/or increased during fasting.« less
Yang, Wenzhi; Zhang, Jingxian; Yao, Changliang; Qiu, Shi; Chen, Ming; Pan, Huiqin; Shi, Xiaojian; Wu, Wanying; Guo, Dean
2016-09-05
Xueshuantong Injection (XSTI), derived from Notoginseng total saponins, is a popular traditional Chinese medicine injection for the treatment of thrombus-resultant diseases. Current knowledge on its therapeutic basis is limited to five major saponins, whereas those minor ones are rarely investigated. We herein develop an offline two-dimensional liquid chromatography/quadrupole time-of-flight mass spectrometry-fast data directed analysis (offline 2D LC/QTOF-Fast DDA) approach to systematically characterize the saponins contained in XSTI. Key parameters affecting chromatographic separation in 2D LC (including stationary phase, mobile phase, column temperature, and gradient elution program) and the detection by QTOF MS (involving spray voltage, cone voltage, and ramp collision energy) were optimized in sequence. The configured offline 2D LC system showed an orthogonality of 0.84 and a theoretical peak capacity of 8976. Total saponins in XSTI were fractionated into eleven samples by the first-dimensional hydrophilic interaction chromatography, which were further analyzed by reversed-phase UHPLC/QTOF-Fast DDA in negative ion mode. The fragmentation features evidenced from 36 saponin reference standards, high-accuracy MS and Fast-DDA-MS(2) data, elemental composition (C<80, H<120, O<50), double-bond equivalent (DBE 5-15), and searching an in-house library of Panax notoginseng, were simultaneously utilized for structural elucidation. Ultimately, 148 saponins were separated and characterized, and 80 have not been isolated from P. notoginseng. An in-depth depiction of the chemical composition of XSTI was achieved. The results obtained would benefit better understanding of the therapeutic basis and significant promotion on the quality standard of XSTI as well as other homologous products. Copyright © 2016. Published by Elsevier B.V.
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.11496 - What are the standards and compliance requirements for process vents?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...
40 CFR 63.9610 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... section at all times, except during periods of startup, shutdown, and malfunction. The terms startup... develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). [68...
Buffer thermal energy storage for a solar Brayton engine
NASA Technical Reports Server (NTRS)
Strumpf, H. J.; Barr, K. P.
1981-01-01
A study has been completed on the application of latent-heat buffer thermal energy storage to a point-focusing solar receiver equipped with an air Brayton engine. To aid in the study, a computer program was written for complete transient/stead-state Brayton cycle performance. The results indicated that thermal storage can afford a significant decrease in the number of engine shutdowns as compared to operating without thermal storage. However, the number of shutdowns does not continuously decrease as the storage material weight increases. In fact, there appears to be an optimum weight for minimizing the number of shutdowns.
Confirmation of shutdown cooling effects
NASA Astrophysics Data System (ADS)
Sato, Kotaro; Tabuchi, Masato; Sugimura, Naoki; Tatsumi, Masahiro
2015-12-01
After the Fukushima accidents, all nuclear power plants in Japan have gradually stopped their operations and have long periods of shutdown. During those periods, reactivity of fuels continues to change significantly especially for high-burnup UO2 fuels and MOX fuels due to radioactive decays. It is necessary to consider these isotopic changes precisely, to predict neutronics characteristics accurately. In this paper, shutdown cooling (SDC) effects of UO2 and MOX fuels that have unusual operation histories are confirmed by the advanced lattice code, AEGIS. The calculation results show that the effects need to be considered even after nuclear power plants come back to normal operation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Medvedev, Pavel G; Ozaltun, Hakan; Robinson, Adam Brady
2014-04-01
Post-irradiation examination of Reduced Enrichment for Research and Test Reactors (RERTR)-12 miniplates showed that in-reactor pillowing occurred in at least 4 plates, rendering performance of these plates unacceptable. To address in-reactor failures, efforts are underway to define the mechanisms responsible for in-reactor pillowing, and to suggest improvements to the fuel plate design and operational conditions. To achieve these objectives, the mechanical response of monolithic fuel to fission and thermally-induced stresses was modeled using a commercial finite element analysis code. Calculations of stresses and deformations in monolithic miniplates during irradiation and after the shutdown revealed that the tensile stress generated inmore » the fuel increased from 2 MPa to 100 MPa at shutdown. The increase in tensile stress at shutdown possibly explains in-reactor pillowing of several RERTR-12 miniplates irradiated to the peak local burnup of up to 1.11x1022 fissions/cm3 . This paper presents the modeling approach and calculation results, and compares results with post-irradiation examinations and mechanical testing of irradiated fuel. The implications for the safe use of the monolithic fuel in research reactors are discussed, including the influence of fuel burnup and power on the magnitude of the shutdown-induced tensile stress.« less
Study on regional air quality impact from a chemical plant emergency shutdown.
Ge, Sijie; Wang, Sujing; Xu, Qiang; Ho, Thomas
2018-06-01
Emergency shutdowns of chemical plants (ESCP) inevitably generate intensive and huge amounts of VOCs and NO x emissions through flaring that can cause highly localized and transient air pollution events with elevated ozone concentrations. However, quantitative studies of regional ozone impact due to ESCP, in terms of how ESCP would affect and to what extent ESCP could impact, are still lacking. This paper reports a systematic study on regional air quality impact from an olefin plant emergency shutdown due to the sudden failure of its cracked gas compressor (CGC). It demonstrates that emergency shutdown may cause significant ozone increment subject to different factors such as the starting time of emergency shutdown, flare destruction and removal efficiency (DRE) and plant location. In our studied case, the 8-hr ozone increment ranges from 0.4 to 3.3 ppb under different starting time, from 3.3 to 24.8 ppb under different DRE, and from 1.6 to 3.3 ppb under different locations. The results enable us to understand how and to what extent emergency operating activities of the chemical process will affect local air quality, which might be beneficial for decision makings on emergency air-quality response and control in the future. Copyright © 2018 Elsevier Ltd. All rights reserved.
Fast, high temperature and thermolabile GC--MS in supersonic molecular beams
NASA Astrophysics Data System (ADS)
Dagan, Shai; Amirav, Aviv
1994-05-01
This work describes and evaluates the coupling of a fast gas chromatograph (GC) based on a short column and high carrier gas flow rate to a supersonic molecular beam mass spectrometer (MS). A 50 cm long megabore column serves for fast GC separation and connects the injector to the supersonic nozzle source. Sampling is achieved with a conventional syringe based splitless sample injection. The injector contains no septum and is open to the atmosphere. The linear velocity of the carrier gas is controlled by a by-pass (make-up) gas flow introduced after the column and prior to the supersonic nozzle. The supersonic expansion serves as a jet separator and the skimmed supersonic molecular beam (SMB) is highly enriched with the heavier organic molecules. The supersonic molecular beam constituents are ionized either by electron impact (EI) or hyperthermal surface ionization (HSI) and mass analyzed. A 1 s fast GC--MS of four aromatic molecules in methanol is demonstrated and some fundamental aspects of fast GC--MS with time limit constraints are outlined. The flow control (programming) of the speed of analysis is shown and the analysis of thermolabile and relatively non-volatile molecules is demonstrated and discussed. The tail-free, fast GC--MS of several mixtures is shown and peak tailing of caffeine is compared with that of conventional GC--MS. The improvement of the peak shapes with the SMB--MS is analyzed with the respect to the elimination of thermal vacuum chamber background. The extrapolated minimum detected amount was about 400 ag of anthracence-d10, with an elution time which was shorter than 2s. Repetitive injections could be performed within less than 10 s. The fast GC--MS in SMB seems to be ideal for fast target compound analysis even in real world, complex mixtures. The few seconds GC--MS separation and quantification of lead (as tetraethyllead) in gasoline, caffeine in coffee, and codeine in a drug is demonstrated. Controlled HSI selectivity is demonstrated in the range of 101 to 104 anthracene/decane which helped to simplify the selective analysis of aromatic molecules in gasoline. The contribution of SMB to the operation of the fast GC--MS is summarized and the compatibility with conventional GC having a megabore column is shown. Splitless injections of 100 [mu]L sample solutions for trace level concentration detection is also presented (with a conventional GC).
Hiong, Kum Chew; Loong, Ai May; Chew, Shit Fun; Ip, Yuen Kwong
2005-12-01
The objectives of this study are to determine whether a full complement of ornithine-urea cycle (OUC) enzymes is present in the hepatopancreas of the giant African snail Achatina fulica, and to investigate whether the rate of urea synthesis and the OUC capacity can be up-regulated during 23 days of fasting or aestivation, or 24 hr post-injection with NH(4)Cl (10 micromol g(-1) snail) into the foot muscle. A. fulica is ureotelic and a full complement of OUC enzymes, including carbamoyl phosphate synthetase III (CPS III), was detected from its hepatopancreas. There were significant increases in the excretion of NH(4)(+), NH(3) and urea in fasting A. fulica. Fasting had no significant effect on the tissue ammonia contents, but led to a progressive accumulation of urea, which was associated with an 18-fold increase in the rate of urea synthesis. Because fasting took place in the presence of water and because there was no change in water contents in the foot muscle and hepatopancreas, it can be concluded that the function of urea accumulation in fasting A. fulica was unrelated to water retention. Aestivation in arid conditions led to a non-progressive accumulation of urea in A. fulica. During the first 4 days and the last 3 days of the 23-day aestivation period, experimental snails exhibited significantly greater rates of urea synthesis compared with fasted snails. These increases were associated with significant increases in activities of various OUC enzymes, except CPS III, in the hepatopancreas. However, the overall urea accumulation in snails aestivated and snails fasted for 23 days were comparable. Therefore, the classical hypothesis that urea accumulation occurred to prevent water loss through evaporation during aestivation in terrestrial pulmonates may not be valid. Surprisingly, there were no accumulations of ammonia in the foot muscle and hepatopancreas of A. fulica 12 or 24 hr after NH(4)Cl was injected into the foot muscle. In contrast, the urea content in the foot muscle of A. fulica increased 4.5- and 33-fold at hour 12 and hour 24, respectively, and the respective increases in the hepatopancreas were 4.9- and 32-fold. The exogenous ammonia injected into A. fulica was apparently detoxified completely to urea. The urea synthesis rate increased 148-fold within the 24-hr experimental period, which could be the greatest increase known among animals. Simultaneously, there were significant increases in activities of glutamine synthetase (2.5-fold), CPS III (3.1-fold), ornithine transcarbamoylase (2.3-fold), argininosuccinate synthetase+lyase (13.6-fold) and arginase (3.5-fold) in the hepatopancreas 12 hr after the injection of NH(4)Cl. Taken altogether, our results support the view that the primary function of urea synthesis through the OUC in A. fulica is to defend against ammonia toxicity, but suggest that urea may have more than an excretory role in terrestrial pulmonates capable of aestivation.
Li, Caina; Hou, Shaocong; Liu, Shuainan; Huan, Yi; Sun, Sujuan; Liu, Quan; Shen, Zhufang
2017-06-19
E2HSA is a genetic fusion protein that consists of two tandem exendin-4 molecules that are covalently bonded to recombinant human serum albumin via a peptide linker. Previous studies have demonstrated that E2HSA significantly decreased blood glucose levels, improved β-cell function and promoted β-cell proliferation in diabetic db/dB mice. This study aimed to evaluate the benefits of E2HSA on glucose and lipid metabolism in a spontaneous diabetes animal model, KKAy mice. E2HSA was acutely administered at doses of 1, 3 and 9 mg/kg by subcutaneous injection in diabetic KKAy mice with exendin-4 (2 μg/kg) as a positive reference, and then the non-fasting blood glucose and food intake levels were dynamically monitored. In addition, different doses of E2HSA were injected once daily, as well as with exendin-4 twice daily, for 7 weeks to evaluate the effect on glucose and lipid metabolism, as well as the body weight, food and water intake. Single injection of E2HSA decreased non-fasting blood glucose and food intake levels in a dose-dependent manner for 4 days and 2 days, respectively. Repeated injections with E2HSA significantly decreased variations in blood glucose levels with a reduction of HbA1c levels by 1.6% at a 9 mg/kg dose, simultaneously increased fasting blood insulin levels, inhibited fasting blood glucagon levels, improved the impaired oral glucose tolerance and enhanced glucose infusion rate, which is the gold standard for evaluating β-cell function. Moreover, repeated injections with E2HSA also ameliorated the dyslipidemia and reduced body weight, food and water intake in diabetic KKAy mice. E2HSA significantly reduced blood glucose levels over a prolonged duration, enhanced β-cell function, and ameliorated dyslipidemia and obesity in diabetic KKAy mice. Thus, E2HSA may be a new candidate for the treatment of type 2 diabetes.
Mazza, Tommaso; Panebianco, Concetta; Saracino, Chiara; Pereira, Stephen P.; Graziano, Paolo; Pazienza, Valerio
2015-01-01
Background/aims Pancreatic cancer (PC) is ranked as the fourth leading cause of cancer-related deaths worldwide. Despite recent advances in treatment options, a modest impact on the outcome of the disease is observed so far. Short-term fasting cycles have been shown to potentiate the efficacy of chemotherapy against glioma. The aim of this study was to assess the effect of fasting cycles on the efficacy of gemcitabine, a standard treatment for PC patients, in vitro and in an in vivo pancreatic cancer mouse xenograft model. Materials and Methods BxPC-3, MiaPaca-2 and Panc-1 cells were cultured in standard and fasting mimicking culturing condition to evaluate the effects of gemcitabine. Pancreatic cancer xenograft mice were subjected to 24h starvation prior to gemcitabine injection to assess the tumor volume and weight as compared to mice fed ad libitum. Results Fasted pancreatic cancer cells showed increased levels of equilibrative nucleoside transporter (hENT1), the transporter of gemcitabine across the cell membrane, and decreased ribonucleotide reductase M1 (RRM1) levels as compared to those cultured in standard medium. Gemcitabine was more effective in inducing cell death on fasted cells as compared to controls. Consistently, xenograft pancreatic cancer mice subjected to fasting cycles prior to gemcitabine injection displayed a decrease of more than 40% in tumor growth. Conclusion Fasting cycles enhance gemcitabine effect in vitro and in the in vivo PC xenograft mouse model. These results suggest that restrictive dietary interventions could enhance the efficacy of existing cancer treatments in pancreatic cancer patients. PMID:26176887
Knowledge engineering for PACES, the particle accelerator control expert system
NASA Astrophysics Data System (ADS)
Lind, P. C.; Poehlman, W. F. S.; Stark, J. W.; Cousins, T.
1992-04-01
The KN-3000 used at Defense Research Establishment Ottawa is a Van de Graaff particle accelerator employed primarily to produce monoenergetic neutrons for calibrating radiation detectors. To provide training and assistance for new operators, it was decided to develop an expert system for accelerator operation. Knowledge engineering aspects of the expert system are reviewed. Two important issues are involved: the need to encapsulate expert knowledge into the system in a form that facilitates automatic accelerator operation and to partition the system so that time-consuming inferencing is minimized in favor of faster, more algorithmic control. It is seen that accelerator control will require fast, narrowminded decision making for rapid fine tuning, but slower and broader reasoning for machine startup, shutdown, fault diagnosis, and correction. It is also important to render the knowledge base in a form conducive to operator training. A promising form of the expert system involves a hybrid system in which high level reasoning is performed on the host machine that interacts with the user, while an embedded controller employs neural networks for fast but limited adjustment of accelerator performance. This partitioning of duty facilitates a hierarchical chain of command yielding an effective mixture of speed and reasoning ability.
Study on the Effect of water Injection Momentum on the Cooling Effect of Rocket Engine Exhaust Plume
NASA Astrophysics Data System (ADS)
Yang, Kan; Qiang, Yanhui; Zhong, Chenghang; Yu, Shaozhen
2017-10-01
For the study of water injection momentum factors impact on flow field of the rocket engine tail flame, the numerical computation model of gas-liquid two phase flow in the coupling of high temperature and high speed gas flow and low temperature liquid water is established. The accuracy and reliability of the numerical model are verified by experiments. Based on the numerical model, the relationship between the flow rate and the cooling effect is analyzed by changing the water injection momentum of the water spray pipes. And the effective mathematical expression is obtained. What’s more, by changing the number of the water spray and using small flow water injection, the cooling effect is analyzed to check the application range of the mathematical expressions. The results show that: the impact and erosion of the gas flow field could be reduced greatly by water injection, and there are two parts in the gas flow field, which are the slow cooling area and the fast cooling area. In the fast cooling area, the influence of the water flow momentum and nozzle quantity on the cooling effect can be expressed by mathematical functions without causing bifurcation flow for the mainstream gas. The conclusion provides a theoretical reference for the engineering application.
33 CFR 127.205 - Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Equipment § 127.205 Emergency shutdown. Each transfer... automatically when the fixed sensors under § 127.201(b) measure LNG concentrations exceeding 40% of the lower...
33 CFR 127.205 - Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Equipment § 127.205 Emergency shutdown. Each transfer... automatically when the fixed sensors under § 127.201(b) measure LNG concentrations exceeding 40% of the lower...
Despite the Shutdown, Rescheduled NIH Research Festival Brings Science to the Forefront | Poster
By Andrea Frydl, Contributing Writer Although it was delayed by almost a month because of the federal shutdown, the NIH Research Festival still took place at the NIH Clinical Center in Bethesda, Md., and attendance was high.
Fast camera observations of injected and intrinsic dust in TEXTOR
NASA Astrophysics Data System (ADS)
Shalpegin, A.; Vignitchouk, L.; Erofeev, I.; Brochard, F.; Litnovsky, A.; Bozhenkov, S.; Bykov, I.; den Harder, N.; Sergienko, G.
2015-12-01
Stereoscopic fast camera observations of pre-characterized carbon and tungsten dust injection in TEXTOR are reported, along with the modelling of tungsten particle trajectories with MIGRAINe. Particle tracking analysis of the video data showed significant differences in dust dynamics: while carbon flakes were prone to agglomeration and explosive destruction, spherical tungsten particles followed quasi-inertial trajectories. Although this inertial nature prevented any validation of the force models used in MIGRAINe, comparisons between the experimental and simulated lifetimes provide a direct evidence of dust temperature overestimation in dust dynamics codes. Furthermore, wide-view observations of the TEXTOR interior revealed the main production mechanism of intrinsic carbon dust, as well as the location of probable dust remobilization sites.
High frequency modulation and injection locking of terahertz quantum cascade lasers
NASA Astrophysics Data System (ADS)
Gu, L.; Wan, W. J.; Zhu, Y. H.; Fu, Z. L.; Li, H.; Cao, J. C.
2017-06-01
Due to intersubband transitions, the quantum cascade laser (QCL) is free of relaxations and able to work under fast modulations. In this work, the authors investigate the fast modulation properties of a continuous wave (cw) terahertz QCL emitting around 3 THz (˜100 μm). Both simulation and experimental results show that the 3 dB modulation bandwidth for the device can reach 11.5 GHz and the modulation response curve is relatively flat upto ˜16 GHz. The radio frequency (RF) injection measurements verify that around the laser threshold the inter-mode beat note interacts strongly with the RF signal and the laser can be modulated at the round trip frequency of 15.5 GHz.
ERIC Educational Resources Information Center
Penteado, Jose C.; Masini, Jorge Cesar
2011-01-01
Influence of the solvent strength determined by the addition of a mobile-phase organic modifier and pH on chromatographic separation of sorbic acid and vanillin has been investigated by the relatively new technique, liquid sequential injection chromatography (SIC). This technique uses reversed-phase monolithic stationary phase to execute fast…
Choi, Jiyun; Cho, Hyunseok; Lee, Seungmin; Kim, Juyeong; Park, Eun-Cheol
2018-05-01
Internet addiction has emerged as a major public health problem worldwide. In November 2011, the South Korean government implemented an online game shutdown policy, lasting from 12:00 to 6:00 am, as a means of preventing Internet addiction in adolescents aged 15 or below. This study analyzed the effect of this shutdown policy on adolescent Internet use, addiction, and sleeping hours. We analyzed data collected from the Korea Youth Risk Behavior Web-based Survey from 2011 to 2015. Respondents were divided into two groups by age: aged 15 or below (male = 76,048, female = 66,281) and aged 16 or above (male = 52,568, female = 49,060). A difference-in-difference analysis was used to evaluate the effect of this shutdown policy. In 2012, which is immediately following policy enforcement, daily amount of Internet use (in minutes) decreased more in adolescents affected by the policy (i.e., the aged 15 or below group). However, it steadily increased in 2013, 2014, 2015, and showed no meaningful long-term improvements 4 years after policy implementation (-3.648 minutes in 2012 [p = .001], -3.204 minutes in 2013 [p = .011], -1.140 minutes in 2014 [p = .384], and 2.190 minutes in 2015 [p = .107]). The shutdown policy did not alter Internet addiction or sleeping hours. Interestingly, female adolescents, adolescents with low academic performance, and adolescents with low exercise levels exhibited comparatively stronger and longer lasting initial declines in Internet usage. The shutdown policy had practically insignificant effects in reducing Internet use for target adolescents. Thus, policymakers aiming to reduce or prevent Internet addiction should use different strategies. Copyright © 2017 The Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
Injection envelope matching in storage rings
DOE Office of Scientific and Technical Information (OSTI.GOV)
Minty, M.G.; Spence, W.L.
1995-05-01
The shape and size of the transverse phase space injected into a storage ring can be deduced from turn-by-turn measurements of the transient behavior of the beam envelope in the ring. Envelope oscillations at 2 x the {beta}-tron frequency indicate the presence of a {beta}-mismatch, while envelope oscillations at the {beta}-tron frequency are the signature of a dispersion function mismatch. Experiments in injection optimization using synchrotron radiation imaging of the beam and a fast-gated camera at the SLC damping rings are reported.
Injection envelope matching in storage rings
NASA Astrophysics Data System (ADS)
Minty, M. G.; Spence, W. L.
1995-05-01
The shape and size of the transverse phase space injected into a storage ring can be deduced from turn-by-turn measurements of the transient behavior of the beam envelope in the ring. Envelope oscillations at 2 x the beta-tron frequency indicate the presence of a beta-mismatch, while envelope oscillations at the beta-tron frequency are the signature of a dispersion function mismatch. Experiments in injection optimization using synchrotron radiation imaging of the beam and a fast-gated camera at the SLC damping rings are reported.
... headaches, increased thirst or urination, vision changes, decreased sex drive fast heartbeat, increased appetite, sudden weight loss, feeling hot, mood changes muscle weakness, numbness or tingling in ...
Are there hunger and satiety factors in the blood of domestic fowls?
Savory, C J; Smith, C J
1987-04-01
The presence of blood-borne hunger and satiety factors in domestic fowls was investigated in two experiments. In the first, birds that had previously been fed ad libitum or fasted for 24 h ate less after their blood had been transfused with that of fed or fasted donors than they did after two control treatments. Blood from fed donors suppressed intake more than did blood from fasted donors, but not significantly so. In the second experiment, previously fed birds ate less in the first hour after intravenous injection of reconstituted plasma from 24-h fasted donors, than after control injections of saline. The same treatments had little or no effect with subjects that had previously been fasted for 24 h. These results consistently indicate an absence of any hunger factor, but are less conclusive with regard to the presence of a satiety factor, for which there is recent evidence in fowls from central administration of plasma. It is suggested that hunger and satiety may be associated with scarcity and abundance of the same humoral factor(s), and that monitoring of blood composition may provide the necessary feedback for longer-term adjustments in food intake, modifying short-term control based on emptying and filling of part(s) of the alimentary tract.
Ilias, Yara; Bieri, Stefan; Christen, Philippe; Veuthey, Jean-Luc
2006-08-01
By its simplicity and rapidity, solid-phase microextraction (SPME) appears as an interesting alternative for sample introduction in fast gas chromatography (fast GC). This combination depends on numerous parameters affecting the desorption step (i.e., the release of compounds from the SPME fiber coating to the GC column). In this study, different liner diameters, injection temperatures, and gas flow rates are evaluated to accelerate the thermal desorption process in the injection port. This process is followed with real-time direct coupling a split/splitless injector to a mass spectrometer by means of a short capillary. It is shown that an effective, quantitative, and rapid transfer of cocaine (COC) and cocaethylene (CE) is performed with a 0.75-mm i.d. liner, at 280 degrees C and 4 mL/min gas flow rate. The 7-microm polydimethylsiloxane (PDMS) coating is selected for combination with fast GC because the 100-microm PDMS fiber presents some limitations caused by fiber bleeding. Finally, the developed SPME-fast GC method is applied to perform in less than 5 min, the quantitation of COC extracted from coca leaves by focused microwave-assisted extraction. An amount of 7.6 +/- 0.5 mg of COC per gram of dry mass is found, which is in good agreement with previously published results.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING AUTOMATIC AUXILIARY BOILERS General Requirements § 63.15-7 Alarms. (a) An audible alarm must automatically sound when a flame safety system shutdown occurs. A visible indicator must indicate that the shutdown was caused by the flame safety system...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2014 CFR
2014-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2013 CFR
2013-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
30 CFR 7.103 - Safety system control test.
Code of Federal Regulations, 2012 CFR
2012-07-01
... sensors which will automatically activate the safety shutdown system and stop the engine before the... the temperature sensor in the exhaust gas stream which will automatically activate the safety shutdown... using a wet exhaust conditioner, determine the effectiveness of the temperature sensor in the exhaust...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... plan, the owner or operator may use the standard operating procedures manual for the battery, provided... startup, shutdown, and malfunction plan that describes procedures for operating the battery, including... (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.2250 - What are the general requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...
40 CFR 63.1354 - Reporting requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner or operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup... information in a semiannual report. Reports shall only be required if a startup, shutdown, or malfunction...
40 CFR 60.51Da - Reporting requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... excluded from the calculation of average emission rates because of startup, shutdown, malfunction (NOX only... than startup, shutdown, malfunction, or emergency conditions. (6) Identification of “F” factor used for calculations, method of determination, and type of fuel combusted. (7) Identification of times when hourly...
49 CFR 192.167 - Compressor stations: Emergency shutdown.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Components § 192.167 Compressor stations: Emergency shutdown. (a) Except for unattended field compressor... fires, and electrical facilities in the vicinity of gas headers and in the compressor building, except that: (i) Electrical circuits that supply emergency lighting required to assist station personnel in...
49 CFR 192.167 - Compressor stations: Emergency shutdown.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Components § 192.167 Compressor stations: Emergency shutdown. (a) Except for unattended field compressor... fires, and electrical facilities in the vicinity of gas headers and in the compressor building, except that: (i) Electrical circuits that supply emergency lighting required to assist station personnel in...
Olivieri, Daniel; Senti, Kirsten-André; Subramanian, Sailakshmi; Sachidanandam, Ravi; Brennecke, Julius
2012-09-28
In animal gonads, PIWI proteins and their bound 23-30 nt piRNAs guard genome integrity by the sequence specific silencing of transposons. Two branches of piRNA biogenesis, namely primary processing and ping-pong amplification, have been proposed. Despite an overall conceptual understanding of piRNA biogenesis, identity and/or function of the involved players are largely unknown. Here, we demonstrate an essential role for the female sterility gene shutdown in piRNA biology. Shutdown, an evolutionarily conserved cochaperone collaborates with Hsp90 during piRNA biogenesis, potentially at the loading step of RNAs into PIWI proteins. We demonstrate that Shutdown is essential for both primary and secondary piRNA populations in Drosophila. An extension of our study to previously described piRNA pathway members revealed three distinct groups of biogenesis factors. Together with data on how PIWI proteins are wired into primary and secondary processing, we propose a unified model for piRNA biogenesis. Copyright © 2012 Elsevier Inc. All rights reserved.
Antarctic Projects Stymied by the Shutdown
NASA Astrophysics Data System (ADS)
Showstack, Randy
2013-10-01
The U.S. federal government shutdown coincided with the beginning of the Antarctic austral summer research window, and many scientists told Eos they are deeply concerned about the impacts on research there. John Priscu, a lead principal investigator with the Whillans Ice Stream Subglacial Access Research Drilling (WISSARD) project in West Antarctica, said the government shutdown "threw us a curve that I did not anticipate or plan for." Pricsu, who has spent 30 seasons working in Antarctica under federal funding, said that a hole in the project's long-term data set "will have a major impact on the models we are developing to examine climate-induced changes" in Antarctic ecosystems.
Carlson, Steven Allen; Anakor, Ifenna Kingsley; Farrell, Greg Robert
2015-06-30
The present invention pertains to electrochemical cells which comprise (a) an anode; (b) a cathode; (c) a solid porous separator, such as a polyolefin, xerogel, or inorganic oxide separator; and (d) a nonaqueous electrolyte, wherein the separator comprises a porous membrane having a microporous coating comprising polymer particles which have not coalesced to form a continuous film. This microporous coating on the separator acts as a safety shutdown layer that rapidly increases the internal resistivity and shuts the cell down upon heating to an elevated temperature, such as 110.degree. C. Also provided are methods for increasing the safety of an electrochemical cell by utilizing such separators with a safety shutdown layer.
Code of Federal Regulations, 2011 CFR
2011-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2014 CFR
2014-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2012 CFR
2012-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2013 CFR
2013-01-01
... to bring and maintain the plant in safe shutdown (non-design basis accident). Applicant means a... Document Control Desk. Nuclear reactor means an apparatus, other than an atomic weapon, designed or used to... from the Restricted Data category pursuant to section 142 of the Act. Safe shutdown (non-design basis...
Code of Federal Regulations, 2012 CFR
2012-10-01
... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of... transmitters shall incorporate a programmable means to implement a system shutdown process in the event of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Cookies Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter Instagram
Active stabilization of a diode laser injection lock.
Saxberg, Brendan; Plotkin-Swing, Benjamin; Gupta, Subhadeep
2016-06-01
We report on a device to electronically stabilize the optical injection lock of a semiconductor diode laser. Our technique uses as discriminator the peak height of the laser's transmission signal on a scanning Fabry-Perot cavity and feeds back to the diode current, thereby maintaining maximum optical power in the injected mode. A two-component feedback algorithm provides constant optimization of the injection lock, keeping it robust to slow thermal drifts and allowing fast recovery from sudden failures such as temporary occlusion of the injection beam. We demonstrate the successful performance of our stabilization method in a diode laser setup at 399 nm used for laser cooling of Yb atoms. The device eases the requirements on passive stabilization and can benefit any diode laser injection lock application, particularly those where several such locks are employed.
Geothermal production and reduced seismicity: Correlation and proposed mechanism
Cardiff, Michael; Lim, David D.; Patterson, Jeremy R.; ...
2018-01-15
At Brady Hot Springs, a geothermal field in Nevada, heated fluids have been extracted, cooled, and re-injected to produce electrical power since 1992. Analysis of daily pumping records and catalogs of microseismicity between 2010 and 2015 indicates a statistically significant correlation between days when the daily volume of production was at or above its long-term average rate and days when no seismic event was detected. Conversely, shutdowns in pumping for plant maintenance correlate with increased microseismicity. Our hypothesis is that the effective stress in the subsurface has adapted to the long-term normal operations (deep extraction) at the site. Under thismore » hypothesis, extraction of fluids inhibits fault slip by increasing the effective stress on faults; in contrast, brief pumping cessations represent times when effective stress is decreased below its long-term average, increasing the likelihood of microseismicity.« less
Geothermal production and reduced seismicity: Correlation and proposed mechanism
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cardiff, Michael; Lim, David D.; Patterson, Jeremy R.
At Brady Hot Springs, a geothermal field in Nevada, heated fluids have been extracted, cooled, and re-injected to produce electrical power since 1992. Analysis of daily pumping records and catalogs of microseismicity between 2010 and 2015 indicates a statistically significant correlation between days when the daily volume of production was at or above its long-term average rate and days when no seismic event was detected. Conversely, shutdowns in pumping for plant maintenance correlate with increased microseismicity. Our hypothesis is that the effective stress in the subsurface has adapted to the long-term normal operations (deep extraction) at the site. Under thismore » hypothesis, extraction of fluids inhibits fault slip by increasing the effective stress on faults; in contrast, brief pumping cessations represent times when effective stress is decreased below its long-term average, increasing the likelihood of microseismicity.« less
Simulation of Cold Flow in a Truncated Ideal Nozzle with Film Cooling
NASA Technical Reports Server (NTRS)
Braman, K. E.; Ruf, J. H.
2015-01-01
Flow transients during rocket start-up and shut-down can lead to significant side loads on rocket nozzles. The capability to estimate these side loads computationally can streamline the nozzle design process. Towards this goal, the flow in a truncated ideal contour (TIC) nozzle has been simulated using RANS and URANS for a range of nozzle pressure ratios (NPRs) aimed to match a series of cold flow experiments performed at the NASA MSFC Nozzle Test Facility. These simulations were performed with varying turbulence model choices and for four approximations of the supersonic film injection geometry, each of which was created with a different simplification of the test article geometry. The results show that although a reasonable match to experiment can be obtained with varying levels of geometric fidelity, the modeling choices made do not fully represent the physics of flow separation in a TIC nozzle with film cooling.
ERIC Educational Resources Information Center
Homem, Vera; Alves, Arminda; Santos, Lu´cia
2014-01-01
A laboratory application with a strong component in analytical chemistry was designed for undergraduate students, in order to introduce a current problem in the environmental science field, the water contamination by antibiotics. Therefore, a simple and rapid method based on direct injection and high performance liquid chromatography-tandem mass…
news For the media Particle Physics Neutrinos Fermilab and the LHC Dark matter and dark energy ADMX discoveries Questions for the universe Ask a scientist Tevatron Tevatron Timeline Tevatron accelerator Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book
Fermilab | Tevatron | Interactive Timeline
Process Looking Ahead For the Media Video of Shutdown Event Guest Book TevatronImpact June 11, 2012 About the Symposium Symposium Agenda Travel & Lodging List of Registrants Organizing Committee Follow in the News Quantum Diaries Tevatron Home Looking Ahead For the Media Shutdown Event Previous Next
40 CFR 63.310 - Requirements for startups, shutdowns, and malfunctions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... CATEGORIES National Emission Standards for Coke Oven Batteries § 63.310 Requirements for startups, shutdowns... or operator shall operate and maintain the coke oven battery and its pollution control equipment... operator of a coke oven battery shall develop, according to paragraph (c) of this section, a written...
46 CFR 153.296 - Emergency shutdown stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... shutdown station must contain a single remote actuator for all quick closing shutoff valves required by... on the tankship. (f) Any remote emergency actuator, such as that for a quick closing shut-off valve... remote emergency actuators. The emergency action must occur whether one or several actuators are operated...
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book check on holiday hours or check the Lederman Science Center website. Groups of six or more must book a
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Science Security, Privacy, Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For
Fermilab | Contact Fermilab | Email Fermilab
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book , Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For Industry Jobs Interact
Fermilab | Tevatron | Shutdown Process
Book Newsroom Newsroom News and features Press releases Photo gallery Fact sheets and brochures Media media Video of shutdown event Guest book Tevatron Impact June 11, 2012 About the symposium Symposium Science Security, Privacy, Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuing compliance; (iv) The type and quantity of HAP emitted by your POTW treatment plant; (v) A... notification of performance tests; a performance test report; a startup, shutdown, and malfunction report; and... prior to beginning operation of your new or reconstructed POTW. You must also submit a startup, shutdown...
40 CFR 60.11 - Compliance with standards and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (meaning those fugitive-type emission sources subject only to an opacity standard). (c) The opacity standards set forth in this part shall apply at all times except during periods of startup, shutdown... startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and...
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.9050 - What reports must I submit and when?
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance... period. This description shall include the type of maintenance performed and the total number of hours...
40 CFR 63.7555 - What records must I keep?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...
40 CFR 63.1590 - What reports must I submit?
Code of Federal Regulations, 2011 CFR
2011-07-01
... continuing compliance; (iv) The type and quantity of HAP emitted by your POTW treatment plant; (v) A... notification of performance tests; a performance test report; a startup, shutdown, and malfunction report; and... prior to beginning operation of your new or reconstructed POTW. You must also submit a startup, shutdown...
40 CFR 63.9050 - What reports must I submit and when?
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance... period. This description shall include the type of maintenance performed and the total number of hours...
40 CFR 63.9050 - What reports must I submit and when?
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance... period. This description shall include the type of maintenance performed and the total number of hours...
40 CFR 63.9050 - What reports must I submit and when?
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the reporting period. (4) If you had a startup, shutdown, or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance... period. This description shall include the type of maintenance performed and the total number of hours...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2011 CFR
2011-07-01
... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...
40 CFR 63.1346 - Operating limits for kilns.
Code of Federal Regulations, 2012 CFR
2012-07-01
... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...
40 CFR 63.102 - General standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... in § 63.101 of this subpart), malfunction, or non-operation of the chemical manufacturing process... subpart G of this part apply. However, if a start-up, shutdown, malfunction or period of non-operation of... part during the start-up, shutdown, malfunction or period of non-operation. For example, if there is an...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prowell, I.; Elgamal, A.; Romanowitz, H.
Demand parameters for turbines, such as tower moment demand, are primarily driven by wind excitation and dynamics associated with operation. For that purpose, computational simulation platforms have been developed, such as FAST, maintained by the National Renewable Energy Laboratory (NREL). For seismically active regions, building codes also require the consideration of earthquake loading. Historically, it has been common to use simple building code approaches to estimate the structural demand from earthquake shaking, as an independent loading scenario. Currently, International Electrotechnical Commission (IEC) design requirements include the consideration of earthquake shaking while the turbine is operating. Numerical and analytical tools usedmore » to consider earthquake loads for buildings and other static civil structures are not well suited for modeling simultaneous wind and earthquake excitation in conjunction with operational dynamics. Through the addition of seismic loading capabilities to FAST, it is possible to simulate earthquake shaking in the time domain, which allows consideration of non-linear effects such as structural nonlinearities, aerodynamic hysteresis, control system influence, and transients. This paper presents a FAST model of a modern 900-kW wind turbine, which is calibrated based on field vibration measurements. With this calibrated model, both coupled and uncoupled simulations are conducted looking at the structural demand for the turbine tower. Response is compared under the conditions of normal operation and potential emergency shutdown due the earthquake induced vibrations. The results highlight the availability of a numerical tool for conducting such studies, and provide insights into the combined wind-earthquake loading mechanism.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Soldaini, Michel
The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while themore » first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.« less
NASA Astrophysics Data System (ADS)
Urbancic, T.; Bosman, K.; Baig, A. M.; Viegas, G. F.
2016-12-01
In response to a number of high-profile incidents of induced seismicity related to petroleum operations, several jurisdictions have enacted regulations requiring modification or temporary shut-down of operations of wells near significant earthquakes. However, these regulations are based on earthquake magnitude alone, and generally local (or Richter) magnitude (ML) if specified at all. We discuss two earthquakes which occurred near Fox Creek, Alberta, Canada, in close proximity to hydraulic fracturing operations, as examples of some complications which may arise in analyzing suspected induced events. For an event that occurred on June 13, 2015, detailed magnitude assessments were performed by two groups in addition to moment magnitude (MW) estimates from the USGS and NRCan. The resulting magnitudes vary between MW3.9- 4.6, thus some estimates would trigger the shut-down regulations in Alberta (M > 4), while some merely require operational modifications (2 < M < 4). Using data from the RAVEN network, we have analyzed an event which occurred on January 12, 2016. We calculate a magnitude of MW4.3 for this event, which agrees within error with estimates from NRCan (MW4.4) and the USGS (Mb4.2). All magnitude estimates for the January 12, 2016 event exceed the threshold for operational shut-down in Alberta. Comparing the spectral amplitude measured at each station to existing standards from the former United States Bureau of Mines and the Uniform Building Code, we determine that structures within 35km of the epicenter may experience light damage due to this earthquake, depending on local soil conditions. Stress drops observed for the events analyzed were 6MPa and 13MPa, in line with typical tectonic events and in contrast to the low values observed for suspected wastewater-injection induced events. This suggests the events were driven by stress redistribution rather than direct influence of fluids. Theoretical source spectra illustrate the profound effect of stress drop on ground motion. Due to the extreme difficulty of predicting the source characteristics of future induced events, regulating based on magnitude alone appears to be an overly simplistic approach. Regulations incorporating observed ground motion provide a more appropriate method of assessing the potential damage resulting from induced seismicity.
Fast quench reactor and method
Detering, Brent A.; Donaldson, Alan D.; Fincke, James R.; Kong, Peter C.
2002-01-01
A fast quench reaction includes a reactor chamber having a high temperature heating means such as a plasma torch at its inlet and a restrictive convergent-divergent nozzle at its outlet end. Reactants are injected into the reactor chamber. The resulting heated gaseous stream is then rapidly cooled by passage through the nozzle. This "freezes" the desired end product(s) in the heated equilibrium reaction stage.
Fast quench reactor and method
Detering, Brent A.; Donaldson, Alan D.; Fincke, James R.; Kong, Peter C.
1998-01-01
A fast quench reaction includes a reactor chamber having a high temperature heating means such as a plasma torch at its inlet and a restrictive convergent-divergent nozzle at its outlet end. Reactants are injected into the reactor chamber. The resulting heated gaseous stream is then rapidly cooled by passage through the nozzle. This "freezes" the desired end product(s) in the heated equilibrium reaction stage.
Fast quench reactor and method
Detering, Brent A.; Donaldson, Alan D.; Fincke, James R.; Kong, Peter C.
2002-09-24
A fast quench reaction includes a reactor chamber having a high temperature heating means such as a plasma torch at its inlet and a restrictive convergent-divergent nozzle at its outlet end. Reactants are injected into the reactor chamber. The resulting heated gaseous stream is then rapidly cooled by passage through the nozzle. This "freezes" the desired end product(s) in the heated equilibrium reaction stage.
Butera, R J; Wilson, C G; Delnegro, C A; Smith, J C
2001-12-01
We present a novel approach to implementing the dynamic-clamp protocol (Sharp et al., 1993), commonly used in neurophysiology and cardiac electrophysiology experiments. Our approach is based on real-time extensions to the Linux operating system. Conventional PC-based approaches have typically utilized single-cycle computational rates of 10 kHz or slower. In thispaper, we demonstrate reliable cycle-to-cycle rates as fast as 50 kHz. Our system, which we call model reference current injection (MRCI); pronounced merci is also capable of episodic logging of internal state variables and interactive manipulation of model parameters. The limiting factor in achieving high speeds was not processor speed or model complexity, but cycle jitter inherent in the CPU/motherboard performance. We demonstrate these high speeds and flexibility with two examples: 1) adding action-potential ionic currents to a mammalian neuron under whole-cell patch-clamp and 2) altering a cell's intrinsic dynamics via MRCI while simultaneously coupling it via artificial synapses to an internal computational model cell. These higher rates greatly extend the applicability of this technique to the study of fast electrophysiological currents such fast a currents and fast excitatory/inhibitory synapses.
Proppant backflow: Mechanical and flow considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
McLennan, John; Walton, Ian; Moore, Joseph
2015-09-01
One of the concerns of using proppant in geothermal wells, and particularly in enhanced geothermal systems, is proppant flowback. Particulate proppant maintain post-closure conductivity in hydraulically opened fractures. If that proppant is displaced from the near-wellbore region, either due to overflushing during stimulation or flowback to the wellbore at any time, the reduced fracture width chokes the injection or production. Two intermediate-scale laboratory analogs of a propped hydraulic fracture were prepared, and fluid was flowed through a normally stressed, propped fracture into a central wellbore. The tests were conducted in a polyaxial load frame. Acoustic/microseismic activity was measured during themore » injection programs. In one scenario—radial flow through a transverse fracture to a wellbore—the results suggest the creation of flow channels and nominally intact propped zones around the channels, maintaining fracture aperture. In the other—linear flow through a longitudinal fracture into a wellbore—there was substantially more proppant removal. The measurements have shown a greater tendency for proppant flowback in a linear flow situation (proppant movement is kinematically more restricted for radial convergent flow). The pressure gradients causing flow are exceedingly small and restraining flowback will be difficult. Convergent flow relationships could be an issue for injector wells, which will experience fluid flowback during hard shutdowns.« less
Modeling the Influence of Injection Modes on the Evolution of Solution Sprays in a Plasma Jet
NASA Astrophysics Data System (ADS)
Shan, Y.; Coyle, T. W.; Mostaghimi, J.
2010-01-01
Solution precursor plasma spraying (SPPS) is a novel technology with great potential for depositing finely structured ceramic coatings with nano- and sub-micrometric features. The solution is injected into the plasma jet either as a liquid stream or gas atomized droplets. Solution droplets or the stream interact with the plasma jet and break up into fine droplets. The solvent vaporizes very fast as the droplets travel downstream. Solid particles are finally formed, and the particle are heated up and accelerated to the substrate to generate the coating. The deposition process and the properties of coatings obtained are extremely sensitive to the process parameters, such as torch operating conditions, injection modes, injection parameters, and substrate temperatures. This article numerically investigates the effect of injection modes, a liquid stream injection and a gas-blast injection, on the size distribution of injected droplets. The particle/droplet size, temperature, and position distributions on the substrate are predicted for different injection modes.
Impact of fasting followed by short-term exposure to interleukin-6 on cytochrome P450 mRNA in mice.
Rasmussen, Martin Krøyer; Bertholdt, Lærke; Gudiksen, Anders; Pilegaard, Henriette; Knudsen, Jakob G
2018-01-05
The gene expression of the cytochrome P450 (CYP) enzyme family is regulated by numerous factors. Fasting has been shown to induce increased hepatic CYP mRNA in both humans and animals. However, the coordinated regulation of CYP, CYP-regulating transcription factors, and transcriptional co-factors in the liver linking energy metabolism to detoxification has never been investigated. Interleukin-6 (IL-6) has been suggested to be released during fasting and has been shown to regulate CYP expression. The present study investigated the hepatic mRNA content of selected CYP, AhR, CAR, PXR and PPARα in mice fasted for 18h and subsequently exposed to IL-6. Furthermore, the impact of fasting on PGC-1α, HNF-4α, SIRT1 and SIRT3 mRNA was examined. Fasting induced a marked increase in Cyp2b10, Cyp2e1 and Cyp4a10 mRNA, while CYP1a1, Cyp1a2, Cyp2a4 and Cyp3a11 mRNA levels remained unchanged. In accordance, the mRNA levels of CAR and PPARα were also increased with fasting. The PGC-1α, SIRT1 and SIRT3 mRNA levels were also increased after fasting, while the HNF-4α mRNA levels remained unchanged. In mice subjected to IL-6 injection, the fasting-induced PXR, PPARα and PGC-1α mRNA responses were lower than after saline injection. In conclusion, fasting was demonstrated to be a strong inducer of hepatic CYP mRNA as well as selected transcription factors controlling the expression of the investigated CYP. Moreover, the mRNA levels of transcriptional co-factors acting as energy sensors and co-factors for CYP regulation was also increased in the liver, suggesting crosstalk at the molecular level between regulation of energy metabolism and detoxification. Copyright © 2017 Elsevier B.V. All rights reserved.
Combustion stability analysis of preburners in liquid propellant rocket engines during shutdown
NASA Technical Reports Server (NTRS)
Lim, Kair-Chuan; George, Paul E., II
1987-01-01
A linearized one-dimensional lumped-parameter model capable of predicting the occurrence of the low frequency combustion instability (chugging) experienced during preburner shutdown in the Space Shuttle Main Engines is discussed, and predictions are compared with NASA experimental results. Results from a parametric study of parameters including chamber pressure, fuel and oxygen temperatures, and the effective bulk modulus of the liquid oxidizer suggest that chugging is probably affected by conditions at shutdown through the fuel and oxidizer temperatures. It is suggested that chugging is initiated when the fuel, oxidizer, and helium temperature and flow rates pass into an unstable region, and that chugging may be terminated by decaying pressures.
Effect of timed secondary-air injection on automotive emissions
NASA Technical Reports Server (NTRS)
Coffin, K. P.
1973-01-01
A single cylinder of an automotive V-8 engine was fitted with an electronically timed system for the pulsed injection of secondary air. A straight-tube exhaust minimized any mixing other than that produced by secondary-air pulsing. The device was operated over a range of engine loads and speeds. Effects attributable to secondary-air pulsing were found, but emission levels were generally no better than using the engine's own injection system. Under nontypical fast-idle, no-load conditions, emission levels were reduced by roughly a factor of 2.
78 FR 23696 - Airworthiness Directives; Eurocopter Deutschland GmbH (ECD) Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... longitudinal main rotor actuator piston after shut-down of the external pump drive, during rigging of the main... rotor controls, of movement of the longitudinal main rotor actuator piston after shut-down of the external pump drive. Such movement could cause incorrect rigging results. The proposed actions are intended...
40 CFR 74.46 - Opt-in source permanent shutdown, reconstruction, or change in affected status.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 16 2011-07-01 2011-07-01 false Opt-in source permanent shutdown, reconstruction, or change in affected status. 74.46 Section 74.46 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Allowance Tracking and Transfer...
25 CFR 226.28 - Shutdown, abandonment, and plugging of wells.
Code of Federal Regulations, 2010 CFR
2010-04-01
... OSAGE RESERVATION LANDS FOR OIL AND GAS MINING Cessation of Operations § 226.28 Shutdown, abandonment... production of oil and/or gas has been demonstrated to the satisfaction of the Superintendent. Lessee shall... the means by which the well bore is to be protected, and the contemplated eventual disposition of the...
A 100 kW experimental wind turbine: Simulation of starting, overspeed, and shutdown characteristics
NASA Technical Reports Server (NTRS)
Gilbert, L. J.
1976-01-01
The ERDA/NASA 100 kW experimental wind turbine is modeled on a digital computer in order to study the performance of a wind turbine under operating conditions. Simulation studies of starting, overspeed, and shutdown performance were made. From these studies operating procedures, precautions, and limitations are prescribed.
46 CFR 153.408 - Tank overflow control.
Code of Federal Regulations, 2010 CFR
2010-10-01
... automatic shutdown system must: (1) Be independent of one-another; and (2) Operate on loss of power. (c) The... lettering as specified for the warning sign in § 153.955. (e) A tank overflow alarm must be audible and... loading is controlled on the tankship. (f) The automatic shutdown system or tank overflow alarm must be...
46 CFR 153.408 - Tank overflow control.
Code of Federal Regulations, 2011 CFR
2011-10-01
... automatic shutdown system must: (1) Be independent of one-another; and (2) Operate on loss of power. (c) The... lettering as specified for the warning sign in § 153.955. (e) A tank overflow alarm must be audible and... loading is controlled on the tankship. (f) The automatic shutdown system or tank overflow alarm must be...
78 FR 49553 - Three Mile Island, Unit 2; Post Shutdown Decommissioning Activities Report
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
...On June 28, 2013, the GPU Nuclear Inc. (GPUN) submitted its Post Shutdown Decommissioning Activity Report (PSDAR) for Three Mile Island, Unit 2 (TMI-2). The PSDAR provides an overview of GPUN's proposed decommissioning activities, schedule, and costs for TMI-2. The NRC is requesting public comments on the PSDAR.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
... (KPS) Post-Shutdown Decommissioning Activities Report (PSDAR), Revision 0, on Wednesday, April 24, 2013... Management System (ADAMS) Accession No. ML13058A065. In a prior communication on November 2, 2012 (ADAMS... at KPS pending completion of a grid stability review by the Midwest Independent Transmission System...
Impact of Government Shutdown on Child Care and Early Education Programs
ERIC Educational Resources Information Center
Center for Law and Social Policy, Inc. (CLASP), 2013
2013-01-01
Congress did not enact a continuing resolution bill by midnight September 30, 2013, thereby triggering a partial government shutdown effective October 1, 2013. October 1 began the federal fiscal year 2014. Most discretionary programs, those that are subject to the annual Congressional appropriations process, will not receive 2014 funding. Most,…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-19
... Turboshaft Engines AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule; request for... describes the unsafe condition as: An uncommanded engine in-flight shutdown of a PZL-10W has been recently reported. The investigation has shown that the uncommanded engine in-flight shutdown was due to excessive...
Fermilab | Science | Questions for the Universe | Einstein's Dream of
Navbar Toggle Search Search Home About Science Jobs Contact Phone Book Newsroom Newsroom News and Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Home Contact Phone Book Fermilab at Work For Industry Jobs Interact Facebook Twitter Instagram Google
40 CFR 74.46 - Opt-in source permanent shutdown, reconstruction, or change in affected status.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Opt-in source permanent shutdown, reconstruction, or change in affected status. 74.46 Section 74.46 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) SULFUR DIOXIDE OPT-INS Allowance Tracking and Transfer...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2014 CFR
2014-07-01
... reporting in § 63.6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report....6010(b), unless you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports
Code of Federal Regulations, 2012 CFR
2012-07-01
... reporting in § 63.6010(f). c. If you had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report....6010(b), unless you meet the requirements for annual reporting in § 63.6010(f). 2. Immediate startup...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...
40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...
40 CFR 63.7720 - What are my general requirements for complying with this subpart?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...
40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...
40 CFR 63.1211 - What are the recordkeeping and reporting requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... compliance date granted under § 63.6(i). 63.10(d)(5)(i) Periodic startup, shutdown, and malfunction reports. 63.10(d)(5)(ii) Immediate startup, shutdown, and malfunction reports. 63.10(e)(3) Excessive emissions and continuous monitoring system performance report and summary report. 63.1206(c)(2)(ii)(B) Startup...
40 CFR 63.1211 - What are the recordkeeping and reporting requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... compliance date granted under § 63.6(i). 63.10(d)(5)(i) Periodic startup, shutdown, and malfunction reports. 63.10(d)(5)(ii) Immediate startup, shutdown, and malfunction reports. 63.10(e)(3) Excessive emissions and continuous monitoring system performance report and summary report. 63.1206(c)(2)(ii)(B) Startup...
40 CFR 63.1211 - What are the recordkeeping and reporting requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... compliance date granted under § 63.6(i). 63.10(d)(5)(i) Periodic startup, shutdown, and malfunction reports. 63.10(d)(5)(ii) Immediate startup, shutdown, and malfunction reports. 63.10(e)(3) Excessive emissions and continuous monitoring system performance report and summary report. 63.1206(c)(2)(ii)(B) Startup...
40 CFR 63.3542 - How do I demonstrate continuous compliance with the emission limitations?
Code of Federal Regulations, 2013 CFR
2013-07-01
... applicable emission limit in § 63.3490. Alternatively, if you calculate an OSEL for all coating type segments... of startup, shutdown, or malfunction of the emission capture system, add-on control device, or... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.1211 - What are the recordkeeping and reporting requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... compliance date granted under § 63.6(i). 63.10(d)(5)(i) Periodic startup, shutdown, and malfunction reports. 63.10(d)(5)(ii) Immediate startup, shutdown, and malfunction reports. 63.10(e)(3) Excessive emissions and continuous monitoring system performance report and summary report. 63.1206(c)(2)(ii)(B) Startup...
40 CFR 63.1211 - What are the recordkeeping and reporting requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... compliance date granted under § 63.6(i). 63.10(d)(5)(i) Periodic startup, shutdown, and malfunction reports. 63.10(d)(5)(ii) Immediate startup, shutdown, and malfunction reports. 63.10(e)(3) Excessive emissions and continuous monitoring system performance report and summary report. 63.1206(c)(2)(ii)(B) Startup...
40 CFR 63.3542 - How do I demonstrate continuous compliance with the emission limitations?
Code of Federal Regulations, 2010 CFR
2010-07-01
... limit in § 63.3490. Alternatively, if you calculate an OSEL for all coating type segments within a... of startup, shutdown, or malfunction of the emission capture system, add-on control device, or... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.3542 - How do I demonstrate continuous compliance with the emission limitations?
Code of Federal Regulations, 2014 CFR
2014-07-01
... applicable emission limit in § 63.3490. Alternatively, if you calculate an OSEL for all coating type segments... of startup, shutdown, or malfunction of the emission capture system, add-on control device, or... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
40 CFR 63.3542 - How do I demonstrate continuous compliance with the emission limitations?
Code of Federal Regulations, 2011 CFR
2011-07-01
... limit in § 63.3490. Alternatively, if you calculate an OSEL for all coating type segments within a... of startup, shutdown, or malfunction of the emission capture system, add-on control device, or... Administrator will determine whether deviations that occur during a period you identify as a startup, shutdown...
Preventing the Shut-Down: Embodied Critical Care in a Teacher Educator's Practice
ERIC Educational Resources Information Center
Trout, Muffet; Basford, Letitia
2016-01-01
This article explores the practice of one teacher educator to understand how she mitigates student resistance to prevent what we call "the shut-down" when teaching mostly White students about systemic forms of oppression. Engaging students in conversations about oppression does not in itself disrupt systems of power and privilege in…
46 CFR 38.15-20 - Remote shutdowns-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Remote shutdowns-TB/ALL. 38.15-20 Section 38.15-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Special Requirements § 38.15-20 Remote shutdowns—TB/ALL. (a) All machinery associated with cargo loading, unloading, or...
46 CFR 38.15-20 - Remote shutdowns-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Remote shutdowns-TB/ALL. 38.15-20 Section 38.15-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Special Requirements § 38.15-20 Remote shutdowns—TB/ALL. (a) All machinery associated with cargo loading, unloading, or...
46 CFR 38.15-20 - Remote shutdowns-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Remote shutdowns-TB/ALL. 38.15-20 Section 38.15-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Special Requirements § 38.15-20 Remote shutdowns—TB/ALL. (a) All machinery associated with cargo loading, unloading, or...
46 CFR 38.15-20 - Remote shutdowns-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Remote shutdowns-TB/ALL. 38.15-20 Section 38.15-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Special Requirements § 38.15-20 Remote shutdowns—TB/ALL. (a) All machinery associated with cargo loading, unloading, or...
46 CFR 38.15-20 - Remote shutdowns-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Remote shutdowns-TB/ALL. 38.15-20 Section 38.15-20 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS LIQUEFIED FLAMMABLE GASES Special Requirements § 38.15-20 Remote shutdowns—TB/ALL. (a) All machinery associated with cargo loading, unloading, or...
Monitoring blood flow and photobleaching during topical ALA PDT treatment
NASA Astrophysics Data System (ADS)
Sands, Theresa L.; Sunar, Ulas; Foster, Thomas H.; Oseroff, Allan R.
2009-02-01
Photodynamic therapy (PDT) using topical aminolevulinic acid (ALA) is currently used as a clinical treatment for nonmelanoma skin cancers. In order to optimize PDT treatment, vascular shutdown early in treatment must be identified and prevented. This is especially important for topical ALA PDT where vascular shutdown is only temporary and is not a primary method of cell death. Shutdown in vasculature would limit the delivery of oxygen which is necessary for effective PDT treatment. Diffuse correlation spectroscopy (DCS) was used to monitor relative blood flow changes in Balb/C mice undergoing PDT at fluence rates of 10mW/cm2 and 75mW/cm2 for colon-26 tumors implanted intradermally. DCS is a preferable method to monitor the blood flow during PDT of lesions due to its ability to be used noninvasively throughout treatment, returning data from differing depths of tissue. Photobleaching of the photosensitizer was also monitored during treatment as an indirect manner of monitoring singlet oxygen production. In this paper, we show the conditions that cause vascular shutdown in our tumor model and its effects on the photobleaching rate.
Self-actuated shutdown system for a commercial size LMFBR. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dupen, C.F.G.
1978-08-01
A Self-Actuated Shutdown System (SASS) is defined as a reactor shutdown system in which sensors, release mechanisms and neutron absorbers are contained entirely within the reactor core structure, where they respond inherently to abnormal local process conditions, by shutting down the reactor, independently of the plant protection system (PPS). It is argued that a SASS, having a response time similar to that of the PPS, would so reduce the already very low probability of a failure-to-scram event that costly design features, derived from core disruptive accident analysis, could be eliminated. However, the thrust of the report is the feasibility andmore » reliability of the in-core SASS hardware to achieve sufficiently rapid shutdown. A number of transient overpower and transient undercooling-responsive systems were investigated leading to the selection of a primary candidate and a backup concept. During a transient undercooling event, the recommended device is triggered by the associated rate of change of pressure, whereas the alternate concept responds to the reduction in core pressure drop and requires calibration and adjustment by the operators to accommodate changes in reactor power.« less
Enhanced autonomic shutdown of Li-ion batteries by polydopamine coated polyethylene microspheres
Baginska, Marta; Blaiszik, Benjamin J.; Rajh, Tijana; ...
2014-07-17
Thermally triggered autonomic shutdown of a Lithium-ion (Li-ion) battery is demonstrated using polydopamine (PDA)-coated polyethylene microspheres applied onto a battery anode. The microspheres are dispersed in a buffered 10 mM dopamine salt solution and the pH is raised to initiate the polymerization and coat the microspheres. Coated microspheres are then mixed with an aqueous binder, applied onto a battery anode surface, dried, and incorporated into Li-ion coin cells. FTIR and Raman spectroscopy are used to verify the presence of the polydopamine on the surface of the microspheres. Scanning electron microscopy is used to examine microsphere surface morphology and resulting anodemore » coating quality. Charge and discharge capacity, as well as impedance, are measured for Li-ion coin cells as a function of microsphere content. Autonomous shutdown is achieved by applying 1.7 mg cm –2 of PDA-coated microspheres to the electrode. Furthermore, the PDA coating significantly reduces the mass of microspheres for effective shutdown compared to our prior work with uncoated microspheres.« less
Wong, Koon-Pong; Sha, Wei; Zhang, Xiaoli; Huang, Sung-Cheng
2011-05-01
The effects of dietary condition and blood glucose level on the kinetics and uptake of (18)F-FDG in mice were systematically investigated using intraperitoneal and tail-vein injection. Dynamic PET was performed for 60 min on 23 isoflurane-anesthetized male C57BL/6 mice after intravenous (n = 11) or intraperitoneal (n = 12) injection of (18)F-FDG. Five and 6 mice in the intravenous and intraperitoneal groups, respectively, were kept fasting overnight (18 ± 2 h), and the others were fed ad libitum. Serial blood samples were collected from the femoral artery to measure (18)F-FDG and glucose concentrations. Image data were reconstructed using filtered backprojection with CT-based attenuation correction. The standardized uptake value (SUV) was estimated from the 45- to 60-min image. The metabolic rate of glucose (MRGlu) and (18)F-FDG uptake constant (K(i)) were derived by Patlak graphical analysis. In the brain, SUV and K(i) were significantly higher in fasting mice with intraperitoneal injection, but MRGlu did not differ significantly under different dietary states and administration routes. Cerebral K(i) was inversely related to elevated blood glucose levels, irrespective of administration route or dietary state. In myocardium, SUV, K(i), and MRGlu were significantly lower in fasting than in nonfasting mice for both routes of injection. Myocardial SUV and K(i) were strongly dependent on the dietary state, and K(i) did not correlate with the blood glucose level. Similar results were obtained for skeletal muscle, although the differences were not as pronounced. Intraperitoneal injection is a valid alternative route, providing pharmacokinetic data equivalent to data from tail-vein injection for small-animal (18)F-FDG PET. Cerebral K(i) varies inversely with blood glucose level, but the measured cerebral MRGlu does not correlate with blood glucose level or dietary condition. Conversely, the K(i) values of the myocardium and skeletal muscle are strongly dependent on dietary condition but not on blood glucose level. In tissue in which (18)F-FDG uptake declines with increasing blood glucose, correction for blood glucose level will make SUV a more robust outcome measure of MRGlu.
On the utility of antiprotons as drivers for inertial confinement fusion
NASA Astrophysics Data System (ADS)
Perkins, L. John; Orth, Charles D.; Tabak, Max
2004-10-01
In contrast to the large mass, complexity and recirculating power of conventional drivers for inertial confinement fusion (ICF), antiproton annihilation offers a specific energy of 90 MJ µg-1 and thus a unique form of energy packaging and delivery. In principle, antiproton drivers could provide a profound reduction in system mass for advanced space propulsion by ICF. We examine the physics underlying the use of antiprotons ( \\bar{p} ) to drive various classes of high-yield ICF targets by the methods of volumetric ignition, hotspot ignition and fast ignition. The useable fraction of annihilation deposition energy is determined for both \\bar{p} -driven ablative compression and \\bar{p} -driven fast ignition, in association with zero- and one-dimensional target burn models. Thereby, we deduce scaling laws for the number of injected antiprotons required per capsule, together with timing and focal spot requirements. The kinetic energy of the injected antiproton beam required to penetrate to the desired annihilation point is always small relative to the deposited annihilation energy. We show that heavy metal seeding of the fuel and/or ablator is required to optimize local deposition of annihilation energy and determine that a minimum of ~3 × 1015 injected antiprotons will be required to achieve high yield (several hundred megajoules) in any target configuration. Target gains—i.e. fusion yields divided by the available p- \\bar{p} annihilation energy from the injected antiprotons ( 1.88\\,GeV/\\bar{p} )—range from ~3 for volumetric ignition targets to ~600 for fast ignition targets. Antiproton-driven ICF is a speculative concept, and the handling of antiprotons and their required injection precision—temporally and spatially—will present significant technical challenges. The storage and manipulation of low-energy antiprotons, particularly in the form of antihydrogen, is a science in its infancy and a large scale-up of antiproton production over present supply methods would be required to embark on a serious R&D programme for this application.
van de Plas, Afke; Slikkerveer, Mariëlle; Hoen, Saskia; Schrijnemakers, Rick; Driessen, Johanna; de Vries, Frank; van den Bemt, Patricia
2017-01-01
In this controlled before-after study the effect of improvements, derived from Lean Six Sigma strategy, on parenteral medication administration errors and the potential risk of harm was determined. During baseline measurement, on control versus intervention ward, at least one administration error occurred in 14 (74%) and 6 (46%) administrations with potential risk of harm in 6 (32%) and 1 (8%) administrations. Most administration errors with high potential risk of harm occurred in bolus injections: 8 (57%) versus 2 (67%) bolus injections were injected too fast with a potential risk of harm in 6 (43%) and 1 (33%) bolus injections on control and intervention ward. Implemented improvement strategies, based on major causes of too fast administration of bolus injections, were: Substitution of bolus injections by infusions, education, availability of administration information and drug round tabards. Post intervention, on the control ward in 76 (76%) administrations at least one error was made (RR 1.03; CI95:0.77-1.38), with a potential risk of harm in 14 (14%) administrations (RR 0.45; CI95:0.20-1.02). In 40 (68%) administrations on the intervention ward at least one error occurred (RR 1.47; CI95:0.80-2.71) but no administrations were associated with a potential risk of harm. A shift in wrong duration administration errors from bolus injections to infusions, with a reduction of potential risk of harm, seems to have occurred on the intervention ward. Although data are insufficient to prove an effect, Lean Six Sigma was experienced as a suitable strategy to select tailored improvements. Further studies are required to prove the effect of the strategy on parenteral medication administration errors.
van de Plas, Afke; Slikkerveer, Mariëlle; Hoen, Saskia; Schrijnemakers, Rick; Driessen, Johanna; de Vries, Frank; van den Bemt, Patricia
2017-01-01
In this controlled before-after study the effect of improvements, derived from Lean Six Sigma strategy, on parenteral medication administration errors and the potential risk of harm was determined. During baseline measurement, on control versus intervention ward, at least one administration error occurred in 14 (74%) and 6 (46%) administrations with potential risk of harm in 6 (32%) and 1 (8%) administrations. Most administration errors with high potential risk of harm occurred in bolus injections: 8 (57%) versus 2 (67%) bolus injections were injected too fast with a potential risk of harm in 6 (43%) and 1 (33%) bolus injections on control and intervention ward. Implemented improvement strategies, based on major causes of too fast administration of bolus injections, were: Substitution of bolus injections by infusions, education, availability of administration information and drug round tabards. Post intervention, on the control ward in 76 (76%) administrations at least one error was made (RR 1.03; CI95:0.77-1.38), with a potential risk of harm in 14 (14%) administrations (RR 0.45; CI95:0.20-1.02). In 40 (68%) administrations on the intervention ward at least one error occurred (RR 1.47; CI95:0.80-2.71) but no administrations were associated with a potential risk of harm. A shift in wrong duration administration errors from bolus injections to infusions, with a reduction of potential risk of harm, seems to have occurred on the intervention ward. Although data are insufficient to prove an effect, Lean Six Sigma was experienced as a suitable strategy to select tailored improvements. Further studies are required to prove the effect of the strategy on parenteral medication administration errors. PMID:28674608
Wang, Chao; Cen, Kefa; Ni, Mingjiang; Li, Xiaodong
2018-01-01
Polychlorinated dibenzo-p-dioxin and polychlorinated dibenzofuran (PCDD/F) emission characteristics and vapour/particulate phase partitions under three continued operation conditions, i.e. shut-down, start-up and after start-up, were investigated by sampling stack gas. The results indicated that the PCDD/F emission levels were 0.40–18.03 ng I-TEQ Nm−3, much higher than the annual monitoring level (0.016 ng I-TEQ Nm−3). Additionally, the PCDD/F emission levels in start-up were higher than the other two conditions. Furthermore, the PCDD/F congener profiles differed markedly between shut-down and start-up, and the chlorination degree of PCDD/F increased in shut-down and decreased evidently in start-up. Moreover, PCDD/F vapour/particulate phase distributions varied significantly under three transient conditions. The PCDD/F vapour phase proportion decreased as the shut-down process continued, then increased as the start-up process proceeded, finally more than 98% of the PCDD/F congeners were distributed in the vapour phase after start-up. The correlations between log(Cv/Cs) versus log pL0 of each PCDD/F congener in stack gas were disorganized in shut-down, and trend to a linear distribution after start-up. Besides, polychlorinated biphenyl emissions show behaviour similar to that of PCDD/F, and the lower chlorinated congeners have a stronger relationship with 2,3,7,8-PCDD/Fs, such as M1CB and D2CB. PMID:29410821
Schalinski, Inga; Teicher, Martin H
2015-01-01
Dissociation, particularly the shutting down of sensory, motor and speech systems, has been proposed to emerge in susceptible individuals as a defensive response to traumatic stress. In contrast, other individuals show signs of hyperarousal to acute threat. A key question is whether exposure to particular types of stressful events during specific stages of development can program an individual to have a strong dissociative response to subsequent stressors. Vulnerability to ongoing shutdown dissociation was assessed in 75 inpatients (46 M/29 F, M = 31 ± 10 years old) with schizophrenia spectrum disorder and related to number of traumatic events experienced or witnessed during childhood or adulthood. The Maltreatment and Abuse Chronology of Exposure (MACE) scale was used to collect retrospective recall of exposure to ten types of maltreatment during each year of childhood. Severity of shutdown dissociation was related to number of childhood but not adult traumatic events. Random forest regression with conditional trees indicated that type and timing of childhood maltreatment could predictably account for 31% of the variance (p < 0.003) in shutdown dissociation, with peak vulnerability occurring at 13-14 years of age and with exposure to emotional neglect followed by various forms of emotional abuse. These findings suggest that there may be windows of vulnerability to the development of shutdown dissociation. Results support the hypothesis that experienced events are more important than witnessed events, but challenge the hypothesis that "life-threatening" events are a critical determinant.
Ion absorption of the high harmonic fast wave in the National Spherical Torus Experiment
NASA Astrophysics Data System (ADS)
Rosenberg, Adam Lewis
Ion absorption of the high harmonic fast wave in a spherical torus is of critical importance to assessing the viability of the wave as a means of heating and driving current. Analysis of recent NSTX shots has revealed that under some conditions when neutral beam and RF power are injected into the plasma simultaneously, a fast ion population with energy above the beam injection energy is sustained by the wave. In agreement with modeling, these experiments find the RF-induced fast ion tail strength and neutron rate at lower B-fields to be less enhanced, likely due to a larger β profile, which promotes greater off-axis absorption where the fast ion population is small. Ion loss codes find the increased loss fraction with decreased B insufficient to account for the changes in tail strength, providing further evidence that this is an RF interaction effect. Though greater ion absorption is predicted with lower k∥, surprisingly little variation in the tail was observed, along with a neutron rate enhancement with higher k∥. Data from the neutral particle analyzer, neutron detectors, x-ray crystal spectrometer, and Thomson scattering is presented, along with results from the TRANSP transport analysis code, ray-tracing codes HPRT and CURRAY, full-wave code and AORSA, quasilinear code CQL3D, and ion loss codes EIGOL and CONBEAM.
Inherent Safety Characteristics of Advanced Fast Reactors
NASA Astrophysics Data System (ADS)
Bochkarev, A. S.; Korsun, A. S.; Kharitonov, V. S.; Alekseev, P. N.
2017-01-01
The study presents SFR transient performance for ULOF events initiated by pump trip and pump seizure with simultaneous failure of all shutdown systems in both cases. The most severe cases leading to the pin cladding rupture and possible sodium boiling are demonstrated. The impact of various features on SFR inherent safety performance for ULOF events was analysed. The decrease in hydraulic resistance of primary loop and increase in primary pump coast down time were investigated. Performing analysis resulted in a set of recommendations to varying parameters for the purpose of enhancing the inherent safety performance of SFR. In order to prevent the safety barrier rupture for ULOF events the set of thermal hydraulic criteria defining the ULOF transient processes dynamics and requirements to these criteria were recommended based on achieved results: primary sodium flow dip under the natural circulation asymptotic level and natural circulation rise time.
NASA Astrophysics Data System (ADS)
Shukla, Jaikaran N.; Halfen, Frank J.; Brynsvold, Glen V.; Syed, Akbar; Jiang, Thomas J.; Wong, Kwok K.; Otwell, Robert L.
1994-07-01
Recent work in lower power generic early applications for the SP-100 have resulted in control system design simplification for a 20 kWe design with thermoelectric power conversion. This paper presents the non-mission-dependent control system features for this design. The control system includes a digital computer based controller, dual purpose control rods and drives, temperature sensors, and neutron flux monitors. The thaw system is mission dependent and can be either electrical or based on NaK trace lines. Key features of the control system and components are discussed. As was the case for higher power applications, the initial on-orbit approach to criticality involves the relatively fast withdrawal of the control-rods to a near-critical position followed by slower movement through critical and into the power range. The control system performs operating maneuvers as well as providing for automatic startup, shutdown, restart, and reactor protection.
NASA Technical Reports Server (NTRS)
Wang, Ten-See; Dumas, Catherine
1993-01-01
A computational fluid dynamics (CFD) model has been applied to study the transient flow phenomena of the nozzle and exhaust plume of the Space Shuttle Main Engine (SSME), fired at sea level. The CFD model is a time accurate, pressure based, reactive flow solver. A six-species hydrogen/oxygen equilibrium chemistry is used to describe the chemical-thermodynamics. An adaptive upwinding scheme is employed for the spatial discretization, and a predictor, multiple corrector method is used for the temporal solution. Both engine start-up and shut-down processes were simulated. The elapse time is approximately five seconds for both cases. The computed results were animated and compared with the test. The images for the animation were created with PLOT3D and FAST and then animated with ABEKAS. The hysteresis effects, and the issues of free-shock separation, restricted-shock separation and the end-effects were addressed.
How fast can an AGN shut down? XMM-Newton observation of IC 2497
NASA Astrophysics Data System (ADS)
Schawinski, Kevin
2008-10-01
We propose to observe IC 2497 with XMM-Newton to detect, or rule out, an obscured AGN that might account for the illumination of `Hanny's Voorwerp'. The Voorwerp is a highly ionised cloud of gas extended over 15-25 kpc next to the spiral galaxy IC 2497. There is no source of ionisation within the Voorwerp, implicating a luminous 1E44 erg/s AGN in IC 2497 as the source. Swift XRT observations do not yield a detection, allowing the presence of a highly obscured, sufficiently luminous AGN. With 34 ksec of XMM observations, we could detect an obscured AGN down to 1E42 erg/s. We can thus either locate an obscured AGN, or we can for the first time constrain the shutdown time scale for a powerful AGN, as it drops by a factor of 100 in luminosity in 1E5 years.
Eyler, Sheila; Welsh, Stuart A.; Smith, David R.; Rockey, Mary
2016-01-01
Hydroelectric dams impact the downstream migrations of silver American Eels Anguilla rostrata via migratory delays and turbine mortality. A radiotelemetry study of American Eels was conducted to determine the impacts of five run-of-the-river hydroelectric dams located over a 195-km stretch of the Shenandoah River, Virginia–West Virginia, during fall 2007–summer 2010. Overall, 96 radio-tagged individuals (mean TL = 85.4 cm) migrated downstream past at least one dam during the study. Most American Eels passed dams relatively quickly; over half (57.9%) of the dam passage events occurred within 1 h of reaching a dam, and most (81.3%) occurred within 24 h of reaching the dam. Two-thirds of the dam passage events occurred via spill, and the remaining passage events were through turbines. Migratory delays at dams were shorter and American Eels were more likely to pass via spill over the dam during periods of high river discharge than during low river discharge. The extent of delay in migration did not differ between the passage routes (spill versus turbine). Twenty-eight American Eels suffered turbine-related mortality, which occurred at all five dams. Mortality rates for eels passing through turbines ranged from 15.8% to 40.7% at individual dams. Overall project-specific mortality rates (with all passage routes combined) ranged from 3.0% to 14.3%. To protect downstream-migrating American Eels, nighttime turbine shutdowns (1800–0600 hours) were implemented during September 15–December 15. Fifty percent of all downstream passage events in the study occurred during the turbine shutdown period. Implementation of the seasonal turbine shutdown period reduced cumulative mortality from 63.3% to 37.3% for American Eels passing all five dams. Modifying the turbine shutdown period to encompass more dates in the spring and linking the shutdowns to environmental conditions could provide greater protection to downstream-migrating American Eels.
COS FUV Recovery after Anomalous Shutdown
NASA Astrophysics Data System (ADS)
Wheeler, Thomas
2012-10-01
This proposal consists of the steps for turning on and ramping up the COS FUV high voltage in a conservative manner after a HV anomalous shutdown by executing a "reduced set" of visits from Cycle 19 Proposal 12810. The nature of the shutdown, i.e., over-light, HV current transient {"crackle"}, ion feedback {induced by a high energy particle}, or field emission {possibly caused by dust or other particulate on the QE grid or other close-by structure or hardware}, and the value of the commanded HV at the time of the shutdown will determine what visits are executed. Because of gain sag, commanded HV settings updates may be required. First, prior to execution of this proposal or selected visits from this proposal, all preliminary steps should be exercised to gather the necessary diagnostic data, e.g., science data evaluation {if a science exposure was in progress and the science data is available}, memory dumps {DCE, EXEC RAM, and possibly the CS BUFFER}, engineering telemetry, or other information that might provide insight as to the nature of the shutdown and estimated count rate. The complete step-by-step procedure is detailed in the Observing Description, but in summary, the following is done:Day 01 activities, visits 01-07, contain both QE grid off and on HV ramping to HVLow {100/100} with diagnostics {DCE dumps} and darks to exclude QE grid involvement in the shutdown. Subsequent to day 01, all HV ramping will be with the QE grid on with the same diagnostics and exposures. All days end with the setting of COS event flag 3 to prevent any FUV HV commanding.Time is allotted for cognizant detector and COS instrument scientist and engineers to examine data dumps, science exposures, and engineering telemetry. If all is well, the go-ahead will be given to clear flag 3 for the next day's visits.This proposal is modeled after the Cycle 19 Proposal 12718.
COS FUV Recovery after Anomalous Shutdown
NASA Astrophysics Data System (ADS)
Wheeler, Thomas
2013-10-01
This proposal consists of the steps for turning on and ramping up the COS FUV high voltage in a safe and conservative manner after a HV anomalous shutdown by executing a "reduced set" of visits from Cycle 19 Proposal 12810. The nature of the shutdown, i.e., over-light, HV current transient {"crackle"}, ion feedback {induced by a high energy particle}, or field emission {possibly caused by dust or other particulate on the QE grid or other close-by structure or hardware}, and the value of the commanded HV at the time of the shutdown will determine what visits are executed. Because of gain sag, commanded HV settings updates may be required. First, prior to execution of this proposal or selected visits from this proposal, all preliminary steps should be exercised to gather the necessary diagnostic data, e.g., science data evaluation {if a science exposure was in progress and the science data is available}, memory dumps {DCE, EXEC RAM, and possibly the CS BUFFER}, engineering telemetry, or other information that might provide insight as to the nature of the shutdown and estimated count rate. The complete step-by-step procedure is detailed in the Observing Description, but in summary, the following is done:Day 01 activities, visits 01-07, contain both QE grid off and on HV ramping to HVLow {100/100} with diagnostics {DCE dumps} and darks to exclude QE grid involvement in the shutdown. Subsequent to day 01, all HV ramping will be with the QE grid on with the same diagnostics and exposures. All days end with the setting of COS event flag 3 to prevent any FUV HV commanding.Time is allotted for cognizant detector and COS instrument scientist and engineers to examine data dumps, science exposures, and engineering telemetry. If all is well, the go-ahead will be given to clear flag 3 for the next day's visits.This proposal is modeled after the Cycle 20 Proposal 13129.
The effect of zinc injection on the increasing of Inconel 600 TT corrosion resistances
NASA Astrophysics Data System (ADS)
Febrianto; Sriyono; Widodo, Surip; Sunaryo, Geni Rina
2018-02-01
Many failures were found in reactor pressure vessel head penetration (RPV) head material. Those failures caused by boric acid corrosion, and from visual examination were found a big hole and white deposit crystal of boric acid during shutdown maintenance at David Besse reactor. Zinc Oxide addition in BWR reactor known as Zinc Injection that has purposed to reduce radiation exposure cause of Hydrogen addition. Beside reducing the radiation exposure, Zinc injection also has an effect in reducing material corrosion. The purpose of study is to determine the effect of zinc addition, boric acid, temperature also the effects of Cobalt Nitrate and Zinc Oxide addition to Inconel 600 TT as RPV head penetration material. The result in the BWR reactor experience will be implementated at PWR reactor, weather zinc oxide addition also has an effect in reducing the corrosion of Inconel 600. The method that used in this research is to observe the corrosion rates for Inconel 600 material using Potentiostat. Examination were conducted in 30, 40, 60, 70, 80 and 80 °C using 1000, 1500, 2000, 2500 and 3000 ppm boric acid concentration. The results showed that the corrosion rate for the material were very small, but the highest corrosion rate occurred in 3000 ppm boric acid concentration at 90 °C with Cobalt Nitrate addition, around 5.210 x 10-1 mpy. In the same condition at 3000 ppm boric acid concentration for temperature at 90 °C, Inconel 600 TT corrosion rate is smaller with Zinc oxide addition, around 4.631 x 10-1 mpy.
Enhancement of radiation therapy by the novel vascular targeting agent ZD6126.
Siemann, Dietmar W; Rojiani, Amyn M
2002-05-01
The aim of this study was to evaluate the antitumor efficacy of the novel vascular targeting agent ZD6126 (N-acetylcochinol-O-phosphate) in the rodent KHT sarcoma model, either alone or in combination with single- or fractionated-dose radiation therapy. C3H/HeJ mice bearing i.m. KHT tumors were injected i.p. with ZD6126 doses ranging from 10 to 150 mg/kg. Tumors were irradiated locally in unanesthetized mice using a linear accelerator. Tumor response to ZD6126 administered alone or in combination with radiation was assessed by clonogenic cell survival assay or tumor growth delay. Treatment with ZD6126 led to a rapid tumor vascular shutdown as determined by Hoechst 33342 diffusion. Histologic evaluation showed morphologic damage of tumor cells within a few hours after drug exposure, followed by extensive central tumor necrosis and neoplastic cell death as a result of prolonged ischemia. When combined with radiation, a 150 mg/kg dose of ZD6126 reduced tumor cell survival 10-500-fold compared with radiation alone. These enhancements in tumor cell killing could be achieved for ZD6126 given both before and after radiation exposure. Further, the shape of the cell survival curve observed after the combination therapy suggested that including ZD6126 in the treatment had a major effect on the radiation-resistant hypoxic cell subpopulation associated with this tumor. Finally, when given on a once-weekly basis in conjunction with fractionated radiotherapy, ZD6126 treatment was found to significantly increase the tumor response to daily 2.5 Gy fractions. The present results demonstrated that in the KHT sarcoma, ZD6126 caused rapid tumor vascular shutdown, induction of central tumor necrosis, tumor cell death secondary to ischemia, and enhancement of the antitumor effects of radiation therapy.
Fast quench reactor and method
Detering, B.A.; Donaldson, A.D.; Fincke, J.R.; Kong, P.C.
1998-05-12
A fast quench reactor includes a reactor chamber having a high temperature heating means such as a plasma torch at its inlet and a restrictive convergent-divergent nozzle at its outlet end. Reactants are injected into the reactor chamber. The resulting heated gaseous stream is then rapidly cooled by passage through the nozzle. This ``freezes`` the desired end product(s) in the heated equilibrium reaction stage. 7 figs.
Aleo, M F; Casella, A; Marinello, E
1981-09-15
The induction of L-threonine deaminase, following nicotinamide injection has been studied: the effect of fasting and of hyperproteic diet have been also taken in consideration. Maximal induction is observed after 5 days hyperproteic diet, and is additional only with nicotinamide treatment. Results are interpreted assuming a different hepatic content and behavior of multiple forms of the enzyme.
Filaretova, L P; Bagaeva, T R; Morozova, O Y; Zelena, D
2014-10-01
Gastric erosion is widespread side effect of nonsteroidal anti-inflammatory drugs. To examine the complexity of the brain-gut axis regulation, indomethacin-induced gastric erosion formation was studied in connection with somatic and behavioral changes. During a constant telemetric recording of heart rate, body temperature, and locomotion of male rats we examined the effects of 24 h fasting, indomethacin (35 mg/kg s.c.) injection, and refeeding at 4 h. Behavior was analyzed on elevated plus maze (EPM) at 24 h and somatic changes at 72 h. Gastric erosion developed 4 h after indomethacin injection, healed 72 h later contrasted by large injury in the small intestine. As classical signs of chronic stress, body and thymus weight were reduced while adrenal weight was enhanced 72 h after indomethacin injection. Fasting by itself changed all telemetrically recorded parameters with most prominent decrease in heart rate. Indomethacin induced similar diminishing effects with earliest and strongest temperature decrease. As a sign of more anxious phenotype locomotion reducing effect of indomethacin injection was detected on EPM. The EPM-induced temperature elevation was missing in indomethacin-treated animals. Fasting by itself induce somatic changes, which can make the animals more vulnerable to ulcerogenic stimuli. Development of indomethacin-induced gastrointestinal lesions happened in parallel with disturbances of heart rate, core body temperature, and chronic stress-like somatic changes as well as anxiety-like behavior. We have to be more aware of the existence of the brain-gut axis and should study changes in the whole body rather than focusing on a specific organ. elevated plus maze.
Centrally Administered Ghrelin Acutely Influences Food Choice in Rodents
Schéle, Erik; Bake, Tina; Rabasa, Cristina; Dickson, Suzanne L.
2016-01-01
We sought to determine whether the orexigenic hormone, ghrelin, is involved in the intrinsic regulation of food choice in rats. Ghrelin would seem suited to serve such a role given that it signals hunger information from the stomach to brain areas important for feeding control, including the hypothalamus and reward system (e.g. ventral tegmental area, VTA). Thus, in rats offered a choice of palatable foods (sucrose pellets and lard) superimposed on regular chow for 2 weeks, we explored whether acute central delivery of ghrelin (intracerebroventricular (ICV) or intra-VTA) is able to redirect their dietary choice. The major unexpected finding is that, in rats with high baseline lard intake, acute ICV ghrelin injection increased their chow intake over 3-fold, relative to vehicle-injected controls, measured at both 3 hr and 6 hr after injection. Similar effects were observed when ghrelin was delivered to the VTA, thereby identifying the VTA as a likely contributing neurobiological substrate for these effects. We also explored food choice after an overnight fast, when endogenous ghrelin levels are elevated, and found similar effects of dietary choice to those described for ghrelin. These effects of fasting on food choice were suppressed in models of suppressed ghrelin signaling (i.e. peripheral injection of a ghrelin receptor antagonist to rats and ghrelin receptor (GHSR) knock-out mice), implicating a role for endogenous ghrelin in the changes in food choice that occur after an overnight fast. Thus, in line with its role as a gut-brain hunger hormone, ghrelin appears to be able to acutely alter food choice, with notable effects to promote “healthy” chow intake, and identify the VTA as a likely contributing neurobiological substrate for these effects. PMID:26925974
DOE Office of Scientific and Technical Information (OSTI.GOV)
Saxberg, Brendan; Plotkin-Swing, Benjamin; Gupta, Subhadeep
We report on a device to electronically stabilize the optical injection lock of a semiconductor diode laser. Our technique uses as discriminator the peak height of the laser’s transmission signal on a scanning Fabry-Perot cavity and feeds back to the diode current, thereby maintaining maximum optical power in the injected mode. A two-component feedback algorithm provides constant optimization of the injection lock, keeping it robust to slow thermal drifts and allowing fast recovery from sudden failures such as temporary occlusion of the injection beam. We demonstrate the successful performance of our stabilization method in a diode laser setup at 399more » nm used for laser cooling of Yb atoms. The device eases the requirements on passive stabilization and can benefit any diode laser injection lock application, particularly those where several such locks are employed.« less
40 CFR Table 8 to Subpart Kkkkk of... - Applicability of General Provisions to Subpart KKKKK
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 7 to Subpart Jjjjj of... - Applicability of General Provisions to Subpart JJJJJ
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 7 to Subpart Jjjjj of... - Applicability of General Provisions to Subpart JJJJJ
Code of Federal Regulations, 2013 CFR
2013-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 7 to Subpart Jjjjj of... - Applicability of General Provisions to Subpart JJJJJ
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 10 to Subpart Ddddd... - Applicability of General Provisions to Subpart DDDDD
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for SSM and startup, shutdown, malfunction plan; and content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM Comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based on...
40 CFR Table 8 to Subpart Kkkkk of... - Applicability of General Provisions to Subpart KKKKK
Code of Federal Regulations, 2014 CFR
2014-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 8 to Subpart Kkkkk of... - Applicability of General Provisions to Subpart KKKKK
Code of Federal Regulations, 2013 CFR
2013-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 10 to Subpart Ddddd... - Applicability of General Provisions to Subpart DDDDD
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for SSM and startup, shutdown, malfunction plan; and content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM Comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based on...
40 CFR Table 8 to Subpart Kkkkk of... - Applicability of General Provisions to Subpart KKKKK
Code of Federal Regulations, 2011 CFR
2011-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR Table 7 to Subpart Jjjjj of... - Applicability of General Provisions to Subpart JJJJJ
Code of Federal Regulations, 2012 CFR
2012-07-01
..., Shutdown, and Malfunction Plan (SSMP) Requirement for startup, shutdown, and malfunction (SSM) and SSMP; content of SSMP Yes. § 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM Yes. § 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based...
40 CFR 63.3930 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... record of whether the deviation occurred during a period of startup, shutdown, or malfunction. (2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction. (3) The records... part 51 for a PTE and has a capture efficiency of 100 percent, as specified in § 63.3965(a). (5) For...
40 CFR 63.4130 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... period of startup, shutdown, or malfunction. (2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction. (3) The records required to show continuous compliance with each... of 100 percent, as specified in § 63.4165(a). (5) For each capture system that is not a PTE, the data...
40 CFR 63.4930 - What records must I keep?
Code of Federal Regulations, 2010 CFR
2010-07-01
... record of whether the deviation occurred during a period of startup, shutdown, or malfunction. (2) The records in § 63.6(e)(3)(iii) through (v) related to startup, shutdown, and malfunction. (3) The records... part 51 for a PTE and has a capture efficiency of 100 percent, as specified in § 63.4964(a). (5) For...
46 CFR 154.540 - Quick-closing shut-off valves: Emergency shut-down system.
Code of Federal Regulations, 2011 CFR
2011-10-01
... BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design... emergency shut-down system that: (a) Closes all the valves; (b) Is actuated by a single control in at least two locations remote from the quick-closing valves; (c) Is actuated by a single control in each cargo...
46 CFR 154.540 - Quick-closing shut-off valves: Emergency shut-down system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... BULK DANGEROUS CARGOES SAFETY STANDARDS FOR SELF-PROPELLED VESSELS CARRYING BULK LIQUEFIED GASES Design... emergency shut-down system that: (a) Closes all the valves; (b) Is actuated by a single control in at least two locations remote from the quick-closing valves; (c) Is actuated by a single control in each cargo...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
...., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown Decommissioning Activities Report AGENCY...) Accession No. ML13340A009), for the Crystal River Unit 3 Nuclear Generating Plant (CR-3). The PSDAR provides.... until 9 p.m., EST, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility...
Fermilab | Tritium at Fermilab | Tritium released into the air and disposed
Science Jobs Contact Phone Book Newsroom Newsroom News and features Press releases Photo gallery Fact Tevatron experiments Tevatron operation Shutdown process For the media Video of shutdown event Guest book Security, Privacy, Legal Use of Cookies Quick Links Home Contact Phone Book Fermilab at Work For Industry
40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.4860 Section... emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and...
40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...
40 CFR 63.9637 - What other requirements must I meet to demonstrate continuous compliance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... limitation in Table 1 to this subpart that applies to you. This includes periods of startup, shutdown, and... subpart. These deviations must be reported in accordance with the requirements in § 63.9641. (b) Startups... period of startup, shutdown, or malfunction are not violations if you demonstrate to the Administrator's...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.4860 Section... emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and...
Code of Federal Regulations, 2011 CFR
2011-07-01
... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.4860 Section... emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.4860 Section... emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and...