Science.gov

Sample records for inspection isi requirements

  1. ISIS-14803 (Isis Pharmaceuticals).

    PubMed

    Witherell, G W

    2001-11-01

    Isis and Merck are developing an antisense oligonucleotide for the potential treatment of hepatitis C virus (HCV) infection [305306]. As of March 2000, the lead from this program, ISI-14803, was being studied in a phase I/II trial where it was administered in three weekly 2-h infusions for 4 weeks [327913], [357823]. Based on these results Isis plans to evaluate the potential of ISIS-14803 in single-agent trials and in combination studies with PEGylated interferon and ribavirin, and in studies that will examine longer-term dosing with both i.v. and s.c. administration [412920]. In January 2000, Isis signed a binding letter of agreement with Elan to form a new subsidiary of Isis to develop ISIS-14803 [351881], [362727]. In October 2001, Isis reported that it had earned a $1.5 million research milestone payment from Merck for progress in this collaboration [426015].

  2. ISIS-3521. Isis Pharmaceuticals.

    PubMed

    Li, K; Zhang, J

    2001-10-01

    ISIS-3521 is a 20-mer antisense phosphorothioate oligonucleotide PKCa expression inhibitor, under development by Isis (formerly in collaboration with Novartis) for the potential treatment of solid tumors that are refractory to, or recurrent with, standard treatment regimens [175741]. In November 1999, Novartis announced that it would end its codevelopment of ISIS-3521 [348221], [348222]. In August 2001, Eli Lilly in-licensed ISIS-3521 [420062]. In October 2000, phase III trials of ISIS-3521, in combination with carboplatin and paclitaxel, were initiated for the treatment of non-small cell lung cancer (NSCLC) [386128]. The FDA granted ISIS-3521 Fast Track review status for NSCLC in November 2000 [388930]. In April 2001, Bear Sterns & Co predicted US approval of ISIS-3521 in 2002 [411081]. In August 2001, Eli Lilly and Isis entered into a four-year strategic alliance that includes ISIS-3521. For the license of ISIS-3521, Isis will receive $25 million in upfront fees and will be reimbursed for remaining phase III development and registration costs [420062].

  3. Final summary report for 1989 inservice inspection (ISI) of SRS (Savannah River Site) 100-P Reactor tank

    SciTech Connect

    Morrison, J.M.; Loibl, M.W.

    1989-12-15

    The integrity of the SRS reactor tanks is a key factor affecting their suitability for continued service since, unlike the external piping system and components, the tanks are virtually irreplaceable. Cracking in various areas of the process water piping systems has occurred beginning in 1960 as a result of several degradation mechanisms, chiefly intergranular stress corrosion cracking (IGSCC) and chloride-induced transgranular cracking. IGSCC, currently the primary degradation mechanism, also occurred in the knuckle'' region (tank wall-to-bottom tube sheet transition piece) unique to C Reactor and was eventually responsible for that reactor being deactivated in 1985. A program of visual examinations of the SRS reactor tanks was initiated in 1968, which used a specially designed immersible periscope. Under that program the condition of the accessible tank welds and associated heat affected zones (HAZ) was evaluated on a five-year frequency. Prior to 1986, the scope of these inspections comprised approximately 20 percent of the accessible weld area. In late 1986 and early 1987 the scope of the inspections was expanded and a 100 percent visual inspection of accessible welds was performed of the P-, L-, and K-Reactor tanks. Supplemental dye penetrant examinations were performed in L Reactor on selected areas which showed visual indications. No evidence of cracking was detected in any of these inspections of the P-, L-, and K-Reactor tanks. 17 refs., 7 figs.

  4. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Contractor Inspection....246-1 Contractor Inspection Requirements. As prescribed in 46.301, insert the following clause: Contractor Inspection Requirements (APR 1984) The Contractor is responsible for performing or...

  5. 48 CFR 46.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contractor inspection... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.301 Contractor inspection requirements. The contracting officer shall insert the clause at 52.246-1, Contractor Inspection Requirements, in...

  6. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.429 Required inspection personnel. (a) No person may use any... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by...

  7. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance, Preventive Maintenance, and Alterations § 135.429 Required inspection personnel. (a) No person may use any... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by...

  8. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false Inspection requirements for DOI pipelines. 250... Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline... indication of pipeline leakage. The results of these inspections shall be retained for at least 2 years...

  9. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false Inspection requirements for DOI pipelines. 250... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline routes shall be inspected...

  10. 48 CFR 52.246-1 - Contractor Inspection Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed all inspections and tests necessary to substantiate that the supplies or services furnished under... required in the contract's specifications, except for specialized inspections or tests specified to be performed solely by the Government. (End of clause)...

  11. 9 CFR 302.1 - Establishments requiring inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Establishments requiring inspection. 302.1 Section 302.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND...

  12. 49 CFR 238.503 - Inspection, testing, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... measuring devices required to perform inspections, tests, and maintenance; and (6) The training, qualification, and designation of employees and contractors to perform inspections, tests, and maintenance. (b....505, the railroad shall adopt the program and shall perform— (1) The inspections and tests of...

  13. Technology evaluation: ISIS-2503, Isis Pharmaceuticals.

    PubMed

    Morse, M A

    2001-12-01

    ISIS-2503, a 20-mer antisense oligonucleotide that inhibits Ha-Ras expression, is being developed by Isis Pharmaceuticals Inc as a potential treatmentfor cancer, particularly tumors that commonly have abnormalities of Ras function. It is in phase II trials. According to an April 2001 report by Bear Stearns & Co, Elan Corp plc had an unspecified collaboration with Isis for the development of ISIS-2503 [419357], but Isis later clarified that there was no agreement between the two companies and that ISIS-2503 had merely been used for the 'OraSense' joint venture that explores the use of antisense oligonucleotidesfor oral administration [419673].

  14. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance... certificated, properly trained, qualified, and authorized to do so. (b) No person may allow any person to... perform required inspections is properly trained and qualified; (3) The required inspection is a result...

  15. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance... certificated, properly trained, qualified, and authorized to do so. (b) No person may allow any person to... perform required inspections is properly trained and qualified; (3) The required inspection is a result...

  16. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES GOVERNING PERSONS ON BOARD SUCH AIRCRAFT Maintenance... certificated, properly trained, qualified, and authorized to do so. (b) No person may allow any person to... perform required inspections is properly trained and qualified; (3) The required inspection is a result...

  17. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Inspection of machines; minimum requirements... Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum requirements. (a) Except as provided in § 18.95, all machines approved under the provisions of this subpart...

  18. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Inspection of machines; minimum requirements... Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum requirements. (a) Except as provided in § 18.95, all machines approved under the provisions of this subpart...

  19. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Inspection of machines; minimum requirements... Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum requirements. (a) Except as provided in § 18.95, all machines approved under the provisions of this subpart...

  20. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Inspection of machines; minimum requirements... Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum requirements. (a) Except as provided in § 18.95, all machines approved under the provisions of this subpart...

  1. 30 CFR 18.97 - Inspection of machines; minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Inspection of machines; minimum requirements... Field Approval of Electrically Operated Mining Equipment § 18.97 Inspection of machines; minimum requirements. (a) Except as provided in § 18.95, all machines approved under the provisions of this subpart...

  2. 40 CFR 63.926 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Inspection and monitoring requirements... (CONTINUED) National Emission Standards for Containers § 63.926 Inspection and monitoring requirements. (a... operator to check for visible cracks, holes, gaps, or other open spaces into the interior of the...

  3. 40 CFR 717.17 - Inspection and reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REACTIONS TO HEALTH OR THE ENVIRONMENT General Provisions § 717.17 Inspection and reporting requirements. (a... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Inspection and reporting requirements. 717.17 Section 717.17 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)...

  4. 40 CFR 717.17 - Inspection and reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REACTIONS TO HEALTH OR THE ENVIRONMENT General Provisions § 717.17 Inspection and reporting requirements. (a... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Inspection and reporting requirements. 717.17 Section 717.17 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)...

  5. 48 CFR 1646.301 - Contractor inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor inspection requirements. 1646.301 Section 1646.301 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT... Clauses 1646.301 Contractor inspection requirements. The clause set forth at 1652.246-70 shall be...

  6. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false Inspection requirements for DOI pipelines. 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline routes shall...

  7. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false Inspection requirements for DOI pipelines. 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline routes shall...

  8. 30 CFR 250.1005 - Inspection requirements for DOI pipelines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false Inspection requirements for DOI pipelines. 250... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Pipelines and Pipeline Rights-of-Way § 250.1005 Inspection requirements for DOI pipelines. (a) Pipeline routes shall...

  9. 18 CFR 12.32 - General inspection requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROJECT WORKS Inspection by Independent Consultant § 12.32 General inspection requirement. In accordance with the procedures in § 12.35, the project works of each development to which this subpart applies... the condition of those project works or in the quality or adequacy of project...

  10. 9 CFR 381.6 - Establishments requiring inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Establishments requiring inspection. 381.6 Section 381.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... to section 5(c) of the Act as one producing adulterated poultry products which would clearly...

  11. 9 CFR 381.6 - Establishments requiring inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Establishments requiring inspection. 381.6 Section 381.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... to section 5(c) of the Act as one producing adulterated poultry products which would clearly...

  12. 9 CFR 302.1 - Establishments requiring inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Establishments requiring inspection. 302.1 Section 302.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... would clearly endanger the public health....

  13. 9 CFR 381.6 - Establishments requiring inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Establishments requiring inspection. 381.6 Section 381.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... to section 5(c) of the Act as one producing adulterated poultry products which would clearly...

  14. 9 CFR 302.1 - Establishments requiring inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Establishments requiring inspection. 302.1 Section 302.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... would clearly endanger the public health....

  15. 9 CFR 381.6 - Establishments requiring inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Establishments requiring inspection. 381.6 Section 381.6 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... to section 5(c) of the Act as one producing adulterated poultry products which would clearly...

  16. 9 CFR 302.1 - Establishments requiring inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Establishments requiring inspection. 302.1 Section 302.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF... would clearly endanger the public health....

  17. 14 CFR 145.155 - Inspection personnel requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Inspection personnel requirements. 145.155 Section 145.155 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Personnel § 145.155 Inspection...

  18. The SWAMI inspection robot: Fernald site requirements

    SciTech Connect

    Hazen, F.B.

    1993-09-28

    The purpose of this document is to introduce and describe the Stored Waste Autonomous Mobile Inspector (SWAMI) robot project and to identify issues that will need to be addressed prior to its field demonstration at Fernald in mid-1995. SWAMI is a mobile robotic vehicle that will perform mandated weekly inspections of waste containers. Fernald has a large inventory of these containers and a need to protect workers from radiation hazards while enhancing the efficiency and effectiveness of the inspections. Fernald`s role in this project is to supply the demonstration site and make all necessary preparations. This includes identification of the test areas and plans, and identification and compliance to Federal, State, DOE, and Site regulations on system safety and quality. In addition, Fernald will link SWAMI output images to off-line mass data storage, and also to an on-line ORACLE database. The authors shall initiate a dialog with State and Federal regulators towards the near term goal of acceptance of the SWAMI test plan and a longer term goal of acceptance of SWAMI as a supplement and improvement to present mandated RCRA inspections.

  19. ISIS Workshops Using Virtualization

    NASA Astrophysics Data System (ADS)

    Becker, K. J.; Becker, T. L.

    2015-06-01

    ISIS workshops are now using virtualization technology to improve the user experience and create a stable, consistent and useful ISIS installation for educational purposes as well as future processing needs.

  20. 48 CFR 46.202-3 - Standard inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Standard inspection requirements. 46.202-3 Section 46.202-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Quality Requirements 46.202-3 Standard...

  1. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant...

  2. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant...

  3. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant...

  4. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant...

  5. 9 CFR 590.24 - Egg products plants requiring continuous inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Egg products plants requiring..., DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Scope of Inspection § 590.24 Egg products plants requiring continuous inspection. No plant...

  6. 7 CFR 762.123 - Insurance and farm inspection requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Insurance and farm inspection requirements. 762.123 Section 762.123 Agriculture Regulations of the Department of Agriculture (Continued) FARM SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS GUARANTEED FARM LOANS § 762.123 Insurance and farm...

  7. 43 CFR 4750.2 - Health, identification, and inspection requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Health, identification, and inspection requirements. 4750.2 Section 4750.2 Public Lands: Interior Regulations Relating to Public Lands (Continued... CONTROL OF WILD FREE-ROAMING HORSES AND BURROS Private Maintenance § 4750.2 Health, identification,...

  8. 40 CFR 63.1366 - Monitoring and inspection requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with a car-seal or lock-and-key type configuration, visually inspect the seal or closure mechanism at...) Monitoring for the pollution prevention alternative standard. The owner or operator of an affected source... monitoring requirements specified in paragraph (b) of this section for the applicable add-on air...

  9. 40 CFR 63.1366 - Monitoring and inspection requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with a car-seal or lock-and-key type configuration, visually inspect the seal or closure mechanism at...) Monitoring for the pollution prevention alternative standard. The owner or operator of an affected source... monitoring requirements specified in paragraph (b) of this section for the applicable add-on air...

  10. 18 CFR 12.35 - Specific inspection requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Specific inspection requirements. 12.35 Section 12.35 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  11. 18 CFR 12.32 - General inspection requirement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General inspection requirement. 12.32 Section 12.32 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  12. 18 CFR 12.35 - Specific inspection requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Specific inspection requirements. 12.35 Section 12.35 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  13. 18 CFR 12.32 - General inspection requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General inspection requirement. 12.32 Section 12.32 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  14. 18 CFR 12.32 - General inspection requirement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General inspection requirement. 12.32 Section 12.32 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  15. 18 CFR 12.32 - General inspection requirement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General inspection requirement. 12.32 Section 12.32 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  16. 9 CFR 11.6 - Inspection space and facility requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., DEPARTMENT OF AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.6 Inspection space and facility requirements. The management of every horse show, horse exhibition, or horse sale or auction, containing Tennessee Walking Horses or racking horses, shall provide, without fee, sufficient space and facilities...

  17. 9 CFR 11.6 - Inspection space and facility requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.6 Inspection space and facility requirements. The management of every horse show, horse exhibition, or horse sale or auction, containing Tennessee Walking Horses or racking horses, shall provide, without fee, sufficient space and facilities...

  18. 18 CFR 12.35 - Specific inspection requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Specific inspection requirements. 12.35 Section 12.35 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS...

  19. 40 CFR 63.1283 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants From Natural Gas Transmission and Storage Facilities § 63.1283 Inspection and monitoring requirements. (a) This section applies to an owner... actual average inlet waste gas flowrate using the model GRI-GLYCalcTM, Version 3.0 or higher, ProMax,...

  20. 40 CFR 63.1283 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants From Natural Gas Transmission and Storage Facilities § 63.1283 Inspection and monitoring requirements. (a) This section applies to an owner... actual average inlet waste gas flowrate using the model GRI-GLYCalcTM, Version 3.0 or higher, ProMax,...

  1. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Requirements for periodic testing, inspection and... of Portable Tanks § 180.605 Requirements for periodic testing, inspection and repair of portable... periodic inspections and tests. Each Specification portable tank must be tested and inspected in...

  2. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Requirements for periodic testing, inspection and... Tanks § 180.605 Requirements for periodic testing, inspection and repair of portable tanks. (a) A... periodic inspections and tests. Each Specification portable tank must be tested and inspected in...

  3. 9 CFR 381.115 - Containers of inspected and passed poultry products required to be labeled.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... poultry products required to be labeled. 381.115 Section 381.115 Animals and Animal Products FOOD SAFETY... AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Labeling and Containers § 381.115 Containers of inspected and passed poultry products required...

  4. 9 CFR 381.115 - Containers of inspected and passed poultry products required to be labeled.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... poultry products required to be labeled. 381.115 Section 381.115 Animals and Animal Products FOOD SAFETY... AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Labeling and Containers § 381.115 Containers of inspected and passed poultry products required...

  5. 9 CFR 381.115 - Containers of inspected and passed poultry products required to be labeled.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... poultry products required to be labeled. 381.115 Section 381.115 Animals and Animal Products FOOD SAFETY... AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Labeling and Containers § 381.115 Containers of inspected and passed poultry products required...

  6. 9 CFR 381.115 - Containers of inspected and passed poultry products required to be labeled.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... poultry products required to be labeled. 381.115 Section 381.115 Animals and Animal Products FOOD SAFETY... AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Labeling and Containers § 381.115 Containers of inspected and passed poultry products required...

  7. 9 CFR 381.115 - Containers of inspected and passed poultry products required to be labeled.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... poultry products required to be labeled. 381.115 Section 381.115 Animals and Animal Products FOOD SAFETY... AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Labeling and Containers § 381.115 Containers of inspected and passed poultry products required...

  8. Uncertainties in NDE Reliability and Assessing the Impact on RI-ISI

    SciTech Connect

    Doctor, Steven R.; Anderson, Michael T.

    2010-08-01

    A major thrust in the past 20 years has been to upgrade nondestructive examinations (NDE) for use in inservice inspection (ISI) programs to more effectively manage degradation at operating nuclear power plants. Risk-informed ISI (RI-ISI) is one of the outcomes of this work, and this approach relies heavily on the reliability of NDE, when properly applied, to detect sources of expected degradation. There have been a number of improvements in the reliability of NDE, specifically in ultrasonic testing (UT), through training of examiners, and improved equipment and procedure development. However, the most significant improvements in UT were derived by moving from prescriptive requirements to performance based requirements. Even with these substantial improvements, NDE contains significant uncertainties and RI-ISI programs need to address and accommodate this factor. As part of the work that PNNL is conducting for the U. S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, we are examining the impact of these uncertainties on the effectiveness of RI-ISI programs.

  9. 46 CFR 176.801 - Notice of inspection deficiencies and requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... representative thereof. However, when a deficiency presents a serious safety hazard to the vessel or its... VESSELS (UNDER 100 GROSS TONS) INSPECTION AND CERTIFICATION Material Inspections § 176.801 Notice of inspection deficiencies and requirements. (a) If during the inspection of a vessel, the vessel or...

  10. 49 CFR 180.509 - Requirements for inspection and test of specification tank cars.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Requirements for inspection and test of... Requirements for inspection and test of specification tank cars. (a) General. Each tank car owner must ensure that a tank car facility: (1) Inspects and tests each item according to the requirements specified...

  11. 49 CFR 180.509 - Requirements for inspection and test of specification tank cars.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Requirements for inspection and test of... Requirements for inspection and test of specification tank cars. (a) General. Each tank car owner must ensure that a tank car facility: (1) Inspects and tests each item according to the requirements specified...

  12. 49 CFR 180.509 - Requirements for inspection and test of specification tank cars.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Requirements for inspection and test of... Requirements for inspection and test of specification tank cars. (a) General. Each tank car owner must ensure that a tank car facility: (1) Inspects and tests each item according to the requirements specified...

  13. 49 CFR 180.509 - Requirements for inspection and test of specification tank cars.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... metal jacket or with a thermal protection system shall have an inspection and test conforming to this... 49 Transportation 3 2011-10-01 2011-10-01 false Requirements for inspection and test of... Requirements for inspection and test of specification tank cars. (a) General. (1) Each tank car facility...

  14. 77 FR 51880 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Requirements for Maintenance of Inspections, Tests, Analyses... regulations related to verification of nuclear power plant construction activities through inspections, tests... determining that inspections, tests, or analyses were performed as required, or that acceptance criteria...

  15. 7 CFR 800.18 - Waivers of the official inspection and Class X weighing requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Waivers of the official inspection and Class X...), DEPARTMENT OF AGRICULTURE GENERAL REGULATIONS Official Inspection and Class X Or Class Y Weighing Requirements § 800.18 Waivers of the official inspection and Class X weighing requirements. (a)...

  16. 7 CFR 800.18 - Waivers of the official inspection and Class X weighing requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 7 2013-01-01 2013-01-01 false Waivers of the official inspection and Class X...), DEPARTMENT OF AGRICULTURE GENERAL REGULATIONS Official Inspection and Class X Or Class Y Weighing Requirements § 800.18 Waivers of the official inspection and Class X weighing requirements. (a)...

  17. 7 CFR 800.18 - Waivers of the official inspection and Class X weighing requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Waivers of the official inspection and Class X...), DEPARTMENT OF AGRICULTURE GENERAL REGULATIONS Official Inspection and Class X Or Class Y Weighing Requirements § 800.18 Waivers of the official inspection and Class X weighing requirements. (a)...

  18. Preliminary ISIS users manual

    NASA Technical Reports Server (NTRS)

    Grantham, C.

    1979-01-01

    The Interactive Software Invocation (ISIS), an interactive data management system, was developed to act as a buffer between the user and host computer system. The user is provided by ISIS with a powerful system for developing software or systems in the interactive environment. The user is protected from the idiosyncracies of the host computer system by providing such a complete range of capabilities that the user should have no need for direct access to the host computer. These capabilities are divided into four areas: desk top calculator, data editor, file manager, and tool invoker.

  19. Routine inspection effort required for verification of a nuclear material production cutoff convention

    SciTech Connect

    Fishbone, L.G.; Sanborn, J.

    1995-08-01

    Preliminary estimates of the inspection effort to verify a Nuclear Material Cutoff Convention are presented. The estimates are based on a database of about 650 facilities in a total of eight states, the five nuclear-weapons states and three ``threshold`` states plus facility-specific inspection requirements. Typical figures for inspection requirements for specific facility types derive from IAEA experience, where applicable. Alternative estimates of inspection effort are used in cutoff options where full IAEA safeguards are not stipulated.

  20. 7 CFR 57.915 - Foreign inspection certification required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 57.915 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION...

  1. 7 CFR 57.915 - Foreign inspection certification required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Section 57.915 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION...

  2. 7 CFR 57.915 - Foreign inspection certification required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Section 57.915 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION...

  3. 7 CFR 57.915 - Foreign inspection certification required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 57.915 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION...

  4. Analysis of inservice inspection relief requests

    SciTech Connect

    Aldrich, D.A.; Cook, J.F.

    1989-08-01

    Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, ``Rules for Inservice Inspection of Nuclear Power Plant components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.

  5. 40 CFR 264.15 - General inspection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... human health. The owner or operator must conduct these inspections often enough to identify problems in... be inspected daily when in use, except for Performance Track member facilities, that must inspect at..., 264.1058, and 264.1083 through 264.1089 of this part, where applicable. (5) Performance Track...

  6. 49 CFR 396.21 - Periodic inspection recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operating the commercial motor vehicles did not perform the commercial motor vehicle's last annual inspection, or if an intermodal equipment provider did not itself perform the annual inspection on equipment...) The qualified inspector performing the inspection shall prepare a report that: (1) Identifies...

  7. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    ISIS and META are two distributed systems projects at Cornell University. The ISIS project, has developed a new methodology, virtual synchrony, for writing robust distributed software. This approach is directly supported by the ISIS Toolkit, a programming system that is distributed to over 300 academic and industrial sites. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project, is about distributed control in a soft real time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are presented. This approach to distributed computing, a philosophy that is believed to significantly distinguish the work from that of others in the field, is explained.

  8. 49 CFR 180.509 - Requirements for inspection and test of specification tank cars.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... tank car that successfully passes a periodic inspection and test must be marked as prescribed in § 180... regard to any other periodic inspection and test requirements, a tank car must have an appropriate... periodic inspection interval, test technique, and acceptance criteria for the lining or coating. The...

  9. 9 CFR 381.197 - Imported products; foreign inspection certificates required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Imported products; foreign inspection certificates required. 381.197 Section 381.197 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... from poultry which received ante mortem and post mortem inspections at the time of slaughter; and...

  10. 9 CFR 381.197 - Imported products; foreign inspection certificates required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Imported products; foreign inspection certificates required. 381.197 Section 381.197 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE... from poultry which received ante mortem and post mortem inspections at the time of slaughter; and...

  11. 46 CFR 107.279 - Certificate of Inspection: Failure to meet requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Certificate of Inspection: Failure to meet requirements. 107.279 Section 107.279 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.279 Certificate...

  12. 46 CFR 107.279 - Certificate of Inspection: Failure to meet requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Certificate of Inspection: Failure to meet requirements. 107.279 Section 107.279 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.279 Certificate...

  13. 46 CFR 107.279 - Certificate of Inspection: Failure to meet requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Certificate of Inspection: Failure to meet requirements. 107.279 Section 107.279 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.279 Certificate...

  14. 46 CFR 107.279 - Certificate of Inspection: Failure to meet requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Certificate of Inspection: Failure to meet requirements. 107.279 Section 107.279 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.279 Certificate...

  15. 46 CFR 107.279 - Certificate of Inspection: Failure to meet requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Certificate of Inspection: Failure to meet requirements. 107.279 Section 107.279 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.279 Certificate...

  16. 46 CFR 31.01-1 - Inspections required-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Inspections required-TB/ALL. 31.01-1 Section 31.01-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS INSPECTION AND CERTIFICATION General § 31.01-1 Inspections required—TB/ALL. (a) Every tank vessel subject to the regulations in...

  17. 33 CFR 150.105 - What are the requirements for annual self-inspection?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner or operator must submit a proposal describing the self-inspection plan to the COTP for acceptance... annual self-inspection? 150.105 Section 150.105 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... What are the requirements for annual self-inspection? (a) The owner or operator of each...

  18. 33 CFR 150.105 - What are the requirements for annual self-inspection?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... owner or operator must submit a proposal describing the self-inspection plan to the COTP for acceptance... annual self-inspection? 150.105 Section 150.105 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... What are the requirements for annual self-inspection? (a) The owner or operator of each...

  19. 33 CFR 150.105 - What are the requirements for annual self-inspection?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... owner or operator must submit a proposal describing the self-inspection plan to the COTP for acceptance... annual self-inspection? 150.105 Section 150.105 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... What are the requirements for annual self-inspection? (a) The owner or operator of each...

  20. 33 CFR 150.105 - What are the requirements for annual self-inspection?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... annual self-inspection? 150.105 Section 150.105 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... What are the requirements for annual self-inspection? (a) The owner or operator of each manned... the results of the annual self-inspection to the Sector Commander, or to the MSU Commander, with...

  1. Evaluation of inservice inspection examinatiions

    SciTech Connect

    Aldrich, D.A.; Cook, J.F.

    1990-05-01

    In order to evaluate the effectiveness of Section 11, Division 1, ``Rules for Inservice Inspection of Nuclear Power Plant Components,`` of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

  2. Evaluation of inservice inspection examinatiions

    SciTech Connect

    Aldrich, D.A.; Cook, J.F.

    1990-05-01

    In order to evaluate the effectiveness of Section 11, Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code examinations, 26 inservice inspection (ISI) summary reports from 24 facilities were reviewed. It was found that these ASME Code examinations and tests are instrumental in revealing indications and defects in welds and plant components. In addition, this study uncovered that fact that some of the Section 11 requirements are apparently not clear and are misunderstood by some of the facilities. Also, the need for more stringent requirements was evaluated and some Code changes are recommended.

  3. ISIS and META projects

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert; Marzullo, Keith

    1990-01-01

    The ISIS project has developed a new methodology, virtual synchony, for writing robust distributed software. High performance multicast, large scale applications, and wide area networks are the focus of interest. Several interesting applications that exploit the strengths of ISIS, including an NFS-compatible replicated file system, are being developed. The META project is distributed control in a soft real-time environment incorporating feedback. This domain encompasses examples as diverse as monitoring inventory and consumption on a factory floor, and performing load-balancing on a distributed computing system. One of the first uses of META is for distributed application management: the tasks of configuring a distributed program, dynamically adapting to failures, and monitoring its performance. Recent progress and current plans are reported.

  4. 9 CFR 11.6 - Inspection space and facility requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Inspection space and facility..., DEPARTMENT OF AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.6 Inspection space and facility... Tennessee Walking Horses or racking horses, shall provide, without fee, sufficient space and facilities...

  5. 9 CFR 11.6 - Inspection space and facility requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 1 2014-01-01 2014-01-01 false Inspection space and facility..., DEPARTMENT OF AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.6 Inspection space and facility... Tennessee Walking Horses or racking horses, shall provide, without fee, sufficient space and facilities...

  6. 46 CFR 169.236 - Inspection and testing required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... States or its territories and possessions, the inspection must be made by a marine chemist certificated... chemist are not reasonably available, the Officer in Charge, Marine Inspection, upon the recommendation of... certificate setting forth this fact in writing must be issued by the certified marine chemist or...

  7. 46 CFR 169.236 - Inspection and testing required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... States or its territories and possessions, the inspection must be made by a marine chemist certificated... chemist are not reasonably available, the Officer in Charge, Marine Inspection, upon the recommendation of... certificate setting forth this fact in writing must be issued by the certified marine chemist or...

  8. 46 CFR 169.236 - Inspection and testing required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... States or its territories and possessions, the inspection must be made by a marine chemist certificated... chemist are not reasonably available, the Officer in Charge, Marine Inspection, upon the recommendation of... certificate setting forth this fact in writing must be issued by the certified marine chemist or...

  9. 40 CFR 63.773 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... inspect because inspecting personnel would be exposed to an imminent or potential danger as a consequence... value is greater. The temperature sensor shall be installed at a location representative of the... value is greater. One temperature sensor shall be installed in the vent stream at the nearest...

  10. 40 CFR 63.773 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... inspect because inspecting personnel would be exposed to an imminent or potential danger as a consequence... value is greater. The temperature sensor shall be installed at a location representative of the... value is greater. One temperature sensor shall be installed in the vent stream at the nearest...

  11. 9 CFR 11.6 - Inspection space and facility requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Inspection space and facility..., DEPARTMENT OF AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.6 Inspection space and facility... Tennessee Walking Horses or racking horses, shall provide, without fee, sufficient space and facilities...

  12. Environmental site assessments and audits: Building inspection requirements

    NASA Astrophysics Data System (ADS)

    Lange, John H.; Kaiser, Genevieve; Thomulka, Kenneth W.

    1994-01-01

    Environmental site assessment criteria were originally developed by organizations that focused, almost exclusively, on surface, subsurface, and pollution source contamination. Many of the hazards associated with indoor environments and building structures were traditionally not considered when evaluating sources and entities of environmental pollution. Since a large number of building materials are potentially hazardous, careful evaluation is necessary. Until recently, little information on building inspection requirements of environmental problems has been published. Traditionally, asbestos has been the main component of concern. The ever-changing environmental standards have dramatically expanded the scope of building surveys. Indoor environmental concerns, for example, currently include formaldehyde, lead-based paint, polychlorinated biphenyls, radon, and indoor air pollution. Environmental regulations are being expanded and developed that specifically include building structures. These regulatory standards are being triggered by an increased awareness of health effects from indoor exposure, fires, spills, and other accidents that have resulted in injury, death, and financial loss. This article discusses various aspects of assessments for building structures.

  13. 46 CFR 169.236 - Inspection and testing required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... boundaries of fuel tanks; or (2) To pipelines, heating coils, pumps, fittings, or other appurtenances... particular vessel. If the inspection indicates that the operations can be undertaken with safety,...

  14. 46 CFR 169.236 - Inspection and testing required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... boundaries of fuel tanks; or (2) To pipelines, heating coils, pumps, fittings, or other appurtenances... particular vessel. If the inspection indicates that the operations can be undertaken with safety,...

  15. Performance demonstration requirements for eddy current steam generator tube inspection

    SciTech Connect

    Kurtz, R.J.; Heasler, P.G.; Anderson, C.M.

    1992-10-01

    This paper describes the methodology used for developing performance demonstration tests for steam generator tube eddy current (ET) inspection systems. The methodology is based on statistical design principles. Implementation of a performance demonstration test based on these design principles will help to ensure that field inspection systems have a high probability of detecting and correctly sizing tube degradation. The technical basis for the ET system performance thresholds is presented. Probability of detection and flaw sizing tests are described.

  16. The Isis Problem as an Experimental Probe and Teaching Resource

    ERIC Educational Resources Information Center

    Greer, Brian; De Bock, Dirk; Van Dooren, Wim

    2009-01-01

    The Isis problem, which has a link with the Isis cult of ancient Egypt, asks: "Find which rectangles with sides of integral length (in some unit) have area and perimeter (numerically) equal, and prove the result." Since the solution requires minimal technical mathematics, the problem is accessible to a wide range of students. Further, it is…

  17. 24 CFR 886.113 - Physical condition standard; physical inspection requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Physical condition standard; physical inspection requirements. 886.113 Section 886.113 Housing and Urban Development REGULATIONS... § 886.113 Physical condition standard; physical inspection requirements. (a) General. Housing used...

  18. 1 CFR 5.2 - Documents required to be filed for public inspection and published.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 1 General Provisions 1 2011-01-01 2011-01-01 false Documents required to be filed for public inspection and published. 5.2 Section 5.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER THE FEDERAL REGISTER GENERAL § 5.2 Documents required to be filed for public inspection and...

  19. 1 CFR 5.2 - Documents required to be filed for public inspection and published.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1 General Provisions 1 2010-01-01 2010-01-01 false Documents required to be filed for public inspection and published. 5.2 Section 5.2 General Provisions ADMINISTRATIVE COMMITTEE OF THE FEDERAL REGISTER THE FEDERAL REGISTER GENERAL § 5.2 Documents required to be filed for public inspection and...

  20. 40 CFR 63.7912 - What are my inspection and monitoring requirements for separators?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 63.7912 What are my inspection and monitoring requirements for separators? (a) If you use a floating...) Visually inspect the floating roof at least annually according to the requirements in § 63.1047(b)(2). (b) If you use a cover vented to a control device according to § 63.7910(b)(1) or (2), you must...

  1. 40 CFR 63.7912 - What are my inspection and monitoring requirements for separators?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 63.7912 What are my inspection and monitoring requirements for separators? (a) If you use a floating...) Visually inspect the floating roof at least annually according to the requirements in § 63.1047(b)(2). (b) If you use a cover vented to a control device according to § 63.7910(b)(1) or (2), you must...

  2. 40 CFR 267.15 - What are my general inspection requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements? 267.15 Section 267.15 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... STANDARDIZED PERMIT General Facility Standards § 267.15 What are my general inspection requirements? (a) You... follow a written schedule for inspecting, monitoring equipment, safety and emergency equipment,...

  3. The Isis cold moderators

    SciTech Connect

    Allen, G. M.; Broome, T. A.; Burridge, R. A.; Cragg, D.; Hall, R.; Haynes, D.; Hirst, J.; Hogston, J. R.; Jones, H. H.; Sexton, J.; Wright, P.

    1997-09-01

    ISIS is a pulsed spallation neutron source where neutrons are produced by the interaction of a 160 kW proton beam of energy 800 MeV in a water-cooled Tantalum Target. The fast neutrons produced are thermalized in four moderators: two ambient water, one liquid methane operating at 100K and a liquid hydrogen moderator at 20 K. This paper gives a description of the construction of both cold moderator systems, details of the operating experience and a description of the current development program.

  4. Alouette-ISIS program summary

    NASA Technical Reports Server (NTRS)

    Jackson, John E.

    1986-01-01

    The Alouette-ISIS program was a joint undertaking between Canada and the United States. Canada provided the Alouette and ISIS spacecraft, data acquisition, and satellite control. The USA provided launch capability, satellite tracking, and data acquisition. Brief descriptions of the six spacecraft and of the investigations on each spacecraft are given. The Alouette-ISIS bibliography, order alphabetically by first author's name, is contained.

  5. 9 CFR 302.1 - Establishments requiring inspection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... 302.1 Section 302.1 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF..., which are intended for use as human food; (2) Every establishment, except as provided in § 303.1 (a) and... livestock are prepared, for use as human food solely for distribution within such jurisdiction; and...

  6. 76 FR 19275 - Passenger Weight and Inspected Vessel Stability Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... SECURITY Coast Guard 46 CFR Parts 115, 170, 176, and 178 RIN 1625-AB20 Passenger Weight and Inspected.... SUMMARY: On December 14, 2010, the Coast Guard amended its regulations governing the maximum weight and..., including increasing the Assumed Average Weight per Person (AAWPP) to 185 lb. The amendment triggered...

  7. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Pt. 230, App. A Appendix A.... Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for...) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable...

  8. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Pt. 230, App. A Appendix A.... Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for...) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable...

  9. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Pt. 230, App. A Appendix A.... Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for...) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable...

  10. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Pt. 230, App. A Appendix A.... Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for...) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable...

  11. 49 CFR Appendix A to Part 230 - Inspection Requirements

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Pt. 230, App. A Appendix A.... Adherence to this list does not relieve the steam locomotive owner and/or operator of responsibility for...) ensuring that the steam locomotive, tender and its parts and appurtenances are safe and suitable...

  12. 9 CFR 381.70 - Ante mortem inspection; when required; extent.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... it is necessary for humane reasons to slaughter an injured animal at night or on a Sunday or holiday... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Ante mortem inspection; when required; extent. 381.70 Section 381.70 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE,...

  13. 9 CFR 381.70 - Ante mortem inspection; when required; extent.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... it is necessary for humane reasons to slaughter an injured animal at night or on a Sunday or holiday... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Ante mortem inspection; when required; extent. 381.70 Section 381.70 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE,...

  14. 9 CFR 381.70 - Ante mortem inspection; when required; extent.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... it is necessary for humane reasons to slaughter an injured animal at night or on a Sunday or holiday... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Ante mortem inspection; when required; extent. 381.70 Section 381.70 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE,...

  15. 9 CFR 381.70 - Ante mortem inspection; when required; extent.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... it is necessary for humane reasons to slaughter an injured animal at night or on a Sunday or holiday... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Ante mortem inspection; when required; extent. 381.70 Section 381.70 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE,...

  16. 46 CFR 31.01-1 - Inspections required-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... marine inspection laws, and the regulations in this subchapter, and when applicable, subchapters E, F, J..., dismantled, and out of commission are exempt from inspections required by law or regulations in this subchapter, provided that such vessels are cleaned of all cargo residue and maintained in a gas...

  17. 40 CFR 63.7897 - What are my inspection and monitoring requirements for tanks?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a fixed roof with an internal floating roof according to § 63.7895(d)(1), you must visually inspect the fixed roof and internal floating roof according to the requirements in § 63.1063(d)(1) and (2). (2) If you use an external floating roof according to § 63.7895(d)(2), you must visually inspect...

  18. 40 CFR 63.7897 - What are my inspection and monitoring requirements for tanks?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a fixed roof with an internal floating roof according to § 63.7895(d)(1), you must visually inspect the fixed roof and internal floating roof according to the requirements in § 63.1063(d)(1) and (2). (2) If you use an external floating roof according to § 63.7895(d)(2), you must visually inspect...

  19. 33 CFR 150.518 - What are the inspection requirements for work vests and immersion suits?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for work vests and immersion suits? 150.518 Section 150.518 Navigation and Navigable Waters COAST... vests and immersion suits? (a) All work vests and immersion suits must be inspected by the owner or... a work vest or immersion suit is inspected and is in serviceable condition, then it may remain...

  20. 33 CFR 150.705 - What are the requirements for maintaining and inspecting aids to navigation?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... maintaining and inspecting aids to navigation? 150.705 Section 150.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.705 What are the requirements for maintaining and inspecting aids to navigation? (a)...

  1. 33 CFR 150.705 - What are the requirements for maintaining and inspecting aids to navigation?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... maintaining and inspecting aids to navigation? 150.705 Section 150.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.705 What are the requirements for maintaining and inspecting aids to navigation? (a)...

  2. 33 CFR 150.705 - What are the requirements for maintaining and inspecting aids to navigation?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... maintaining and inspecting aids to navigation? 150.705 Section 150.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.705 What are the requirements for maintaining and inspecting aids to navigation? (a)...

  3. 33 CFR 150.705 - What are the requirements for maintaining and inspecting aids to navigation?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... maintaining and inspecting aids to navigation? 150.705 Section 150.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.705 What are the requirements for maintaining and inspecting aids to navigation? (a)...

  4. 33 CFR 150.705 - What are the requirements for maintaining and inspecting aids to navigation?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... maintaining and inspecting aids to navigation? 150.705 Section 150.705 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: OPERATIONS Aids to Navigation § 150.705 What are the requirements for maintaining and inspecting aids to navigation? (a)...

  5. 7 CFR 319.40-9 - Inspection and other requirements at port of first arrival.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Inspection and other requirements at port of first arrival. 319.40-9 Section 319.40-9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  6. 7 CFR 319.40-9 - Inspection and other requirements at port of first arrival.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Inspection and other requirements at port of first arrival. 319.40-9 Section 319.40-9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  7. 7 CFR 319.40-9 - Inspection and other requirements at port of first arrival.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 5 2011-01-01 2011-01-01 false Inspection and other requirements at port of first arrival. 319.40-9 Section 319.40-9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  8. 7 CFR 319.40-9 - Inspection and other requirements at port of first arrival.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 5 2014-01-01 2014-01-01 false Inspection and other requirements at port of first arrival. 319.40-9 Section 319.40-9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  9. 7 CFR 319.40-9 - Inspection and other requirements at port of first arrival.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 5 2013-01-01 2013-01-01 false Inspection and other requirements at port of first arrival. 319.40-9 Section 319.40-9 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES...

  10. 76 FR 55363 - Proposed Information Collection; Comment Request; Seafood Inspection and Certification Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Proposed Information Collection; Comment Request; Seafood Inspection and Certification Requirements AGENCY: National Oceanic and Atmospheric Administration...

  11. 21 CFR 1316.07 - Requirement for administrative inspection warrant; exceptions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., for the inspection of books and records pursuant to an administrative subpoena issued in accordance... is lacking; or (e) In any other situations where a warrant is not constitutionally required....

  12. 7 CFR 52.24 - Where to file for an appeal inspection and information required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... required. 52.24 Section 52.24 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES, PROCESSED...

  13. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat...

  14. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat...

  15. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat...

  16. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat...

  17. 9 CFR 442.3 - Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Scale requirements for accurate... PROCEDURES AND REQUIREMENTS FOR ACCURATE WEIGHTS § 442.3 Scale requirements for accurate weights, repairs, adjustments, and replacements after inspection. (a) All scales used to determine the net weight of meat...

  18. Qualification Requirements of Guided Ultrasonic Waves for Inspection of Piping in Light Water Reactors

    SciTech Connect

    Meyer, Ryan M.; Ramuhalli, Pradeep; Doctor, Steven R.; Bond, Leonard J.

    2013-08-01

    Guided ultrasonic waves (GUW) are being increasingly used for both NDT and monitoring of piping. GUW offers advantages over many conventional NDE technologies due to the ability to inspect large volumes of piping components without significant removal of thermal insulation or protective layers. In addition, regions rendered inaccessible to more conventional NDE technologies may be more accessible using GUW techniques. For these reasons, utilities are increasingly considering the use of GUWs for performing the inspection of piping components in nuclear power plants. GUW is a rapidly evolving technology and its usage for inspection of nuclear power plant components requires refinement and qualification to ensure it is able to achieve consistent and acceptable levels of performance. This paper will discuss potential requirements for qualification of GUW techniques for the inspection of piping components in light water reactors (LWRs). The Nuclear Regulatory Commission has adopted ASME Boiler and Pressure Vessel Code requirements in Sections V, III, and XI for nondestructive examination methods, fabrication inspections, and pre-service and in-service inspections. A Section V working group has been formed to place the methodology of GUW into the ASME Boiler and Pressure Vessel Code but no requirements for technique, equipment, or personnel exist in the Code at this time.

  19. Review of current practices and requirements for the inspection of prestressed concrete pressure vessels

    SciTech Connect

    Reimann, K.J.

    1980-12-01

    Code requirements for pre- and in-service inspection of prestressed concrete pressure vessels as utilized in gas-cooled reactors are reviewed and compared with practices and experiences during construction, commissioning, and operation of such reactors. The pre-service inspection relies heavily on embedded instrumentation for measurements of stresses, temperatures, and displacements. The same instrumentation is later used for in-service surveillance, which additionally includes visual examination of exposed surfaces, monitoring of tendon conditions, and measurement of tendon loads. Improvement of present monitoring instrumentation and/or techniques, rather than development of new in-service inspection methods, is recommended.

  20. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM- 2007

    SciTech Connect

    West, B; Ruel Waltz, R

    2008-06-05

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. The 2007 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. A very small amount of material had seeped from Tank 12 from a previously identified leaksite. The material observed had dried on the tank wall and did not reach the annulus floor. A total of 5945 photographs were made and 1221 visual and video inspections were performed during 2007. Additionally, ultrasonic testing was performed on four Waste Tanks (15, 36, 37 and 38) in accordance with approved inspection plans that met the requirements of WSRC-TR-2002- 00061, Revision 2 'In-Service Inspection Program for High Level Waste Tanks'. The Ultrasonic Testing (UT) In-Service Inspections (ISI) are documented in a separate report that is prepared by the ISI programmatic Level III UT Analyst. Tanks 15, 36, 37 and 38 are documented in 'Tank Inspection NDE Results for Fiscal Year 2007'; WSRC-TR-2007-00064.

  1. 12 CFR 11.3 - Filing requirements and inspection of documents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SECURITIES EXCHANGE ACT DISCLOSURE RULES § 11.3 Filing requirements and inspection of documents. (a) Filing... Securities and Corporate Practices Division, Office of the Comptroller of the Currency, 250 E Street, SW... statements must be posted on a registered national bank's Web site are mandatory for statements required...

  2. 12 CFR 11.3 - Filing requirements and inspection of documents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... SECURITIES EXCHANGE ACT DISCLOSURE RULES § 11.3 Filing requirements and inspection of documents. (a) Filing... Securities and Corporate Practices Division, Office of the Comptroller of the Currency, 250 E Street, SW... statements must be posted on a registered national bank's Web site are mandatory for statements required...

  3. 12 CFR 11.3 - Filing requirements and inspection of documents.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... SECURITIES EXCHANGE ACT DISCLOSURE RULES § 11.3 Filing requirements and inspection of documents. (a) Filing... Securities and Corporate Practices Division, Office of the Comptroller of the Currency, 250 E Street, SW... statements must be posted on a registered national bank's Web site are mandatory for statements required...

  4. 12 CFR 11.3 - Filing requirements and inspection of documents.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... SECURITIES EXCHANGE ACT DISCLOSURE RULES § 11.3 Filing requirements and inspection of documents. (a) Filing... Securities and Corporate Practices Division, Office of the Comptroller of the Currency, 250 E Street, SW... statements must be posted on a registered national bank's Web site are mandatory for statements required...

  5. 30 CFR 77.216-3 - Water, sediment, or slurry impoundments and impounding structures; inspection requirements...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Water, sediment, or slurry impoundments and... COAL MINES Surface Installations § 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements. (a) All water, sediment,...

  6. 30 CFR 77.216-3 - Water, sediment, or slurry impoundments and impounding structures; inspection requirements...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Water, sediment, or slurry impoundments and... COAL MINES Surface Installations § 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements. (a) All water, sediment,...

  7. 30 CFR 77.216-3 - Water, sediment, or slurry impoundments and impounding structures; inspection requirements...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Water, sediment, or slurry impoundments and... COAL MINES Surface Installations § 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements. (a) All water, sediment,...

  8. 30 CFR 77.216-3 - Water, sediment, or slurry impoundments and impounding structures; inspection requirements...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Water, sediment, or slurry impoundments and... COAL MINES Surface Installations § 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements. (a) All water, sediment,...

  9. 30 CFR 77.216-3 - Water, sediment, or slurry impoundments and impounding structures; inspection requirements...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Water, sediment, or slurry impoundments and... COAL MINES Surface Installations § 77.216-3 Water, sediment, or slurry impoundments and impounding structures; inspection requirements; correction of hazards; program requirements. (a) All water, sediment,...

  10. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Wastewater-Inspection and Monitoring..., Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements...(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper...

  11. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Wastewater-Inspection and Monitoring..., Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements...(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper...

  12. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Wastewater-Inspection and Monitoring..., Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring Requirements...(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper...

  13. 40 CFR 63.906 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Owners and operators that use a tank equipped with a fixed roof in accordance with the provisions of § 63.902 of this subpart shall meet the following requirements: (1) The fixed roof and its closure devices... emissions. Defects include, but are not limited to, visible cracks, holes, or gaps in the roof sections...

  14. 40 CFR 63.906 - Inspection and monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Owners and operators that use a tank equipped with a fixed roof in accordance with the provisions of § 63.902 of this subpart shall meet the following requirements: (1) The fixed roof and its closure devices... emissions. Defects include, but are not limited to, visible cracks, holes, or gaps in the roof sections...

  15. 40 CFR 63.1366 - Monitoring and inspection requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... condenser outlet gas temperature as a site-specific operating parameter which must be measured and recorded... emission stream as required by the standards in § 63.1362. (A) The temperature monitoring device must be accurate to within ±2 percent of the temperature measured in degrees Celsius or ±2.5 °C, whichever...

  16. 40 CFR 165.90 - Operational, inspection and maintenance requirements for all new and existing containment...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Standards for Pesticide Containment Structures § 165.90 Operational, inspection and maintenance requirements... all new and existing containment structures? As the owner or operator of a new or existing...

  17. 40 CFR 165.90 - Operational, inspection and maintenance requirements for all new and existing containment...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Standards for Pesticide Containment Structures § 165.90 Operational, inspection and maintenance requirements... all new and existing containment structures? As the owner or operator of a new or existing...

  18. 40 CFR 165.90 - Operational, inspection and maintenance requirements for all new and existing containment...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Standards for Pesticide Containment Structures § 165.90 Operational, inspection and maintenance requirements... all new and existing containment structures? As the owner or operator of a new or existing...

  19. 40 CFR 165.90 - Operational, inspection and maintenance requirements for all new and existing containment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PESTICIDE PROGRAMS PESTICIDE MANAGEMENT AND DISPOSAL Standards for Pesticide Containment Structures § 165.90 Operational, inspection and maintenance requirements... all new and existing containment structures? As the owner or operator of a new or existing...

  20. 34 CFR 682.515 - Records, reports, and inspection requirements for Federal GSL program lenders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...)(ii)(C)-(K) on microfilm, optical disk, or other machine readable format. (ii) The holder of the... the Secretary reasonably may require. (c) Inspections. Upon request, a lender or its agent shall... Office of Management and Budget under control number 1845-0020) (Authority: 20 U.S.C. 1077, 1078-1,...

  1. 9 CFR 72.9 - Interstate movements of cattle; inspection and certification by APHIS inspector required.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Interstate movements of cattle... ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS TEXAS (SPLENETIC) FEVER IN CATTLE § 72.9 Interstate movements of cattle; inspection and certification by APHIS inspector required. All interstate movements...

  2. 9 CFR 72.9 - Interstate movements of cattle; inspection and certification by APHIS inspector required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Interstate movements of cattle... ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS TEXAS (SPLENETIC) FEVER IN CATTLE § 72.9 Interstate movements of cattle; inspection and certification by APHIS inspector required. All interstate movements...

  3. 9 CFR 72.9 - Interstate movements of cattle; inspection and certification by APHIS inspector required.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 1 2013-01-01 2013-01-01 false Interstate movements of cattle... ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS TEXAS (SPLENETIC) FEVER IN CATTLE § 72.9 Interstate movements of cattle; inspection and certification by APHIS inspector required. All interstate movements...

  4. 9 CFR 72.9 - Interstate movements of cattle; inspection and certification by APHIS inspector required.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Interstate movements of cattle... ANIMALS (INCLUDING POULTRY) AND ANIMAL PRODUCTS TEXAS (SPLENETIC) FEVER IN CATTLE § 72.9 Interstate movements of cattle; inspection and certification by APHIS inspector required. All interstate movements...

  5. 30 CFR 250.446 - What are the BOP maintenance and inspection requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....11, Maintenance; and Sections 17.12 and 18.12, Quality Management, described in API RP 53... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What are the BOP maintenance and inspection requirements? 250.446 Section 250.446 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE...

  6. 30 CFR 250.446 - What are the BOP maintenance and inspection requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....12 and 18.12, Quality Management, described in API RP 53, Recommended Practices for Blowout... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What are the BOP maintenance and inspection requirements? 250.446 Section 250.446 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION,...

  7. 30 CFR 250.617 - What are my BOP inspection and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Sections 17.11 and 18.11, Maintenance; and Sections 17.12 and 18.12, Quality Management, described in API... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What are my BOP inspection and maintenance requirements? 250.617 Section 250.617 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION,...

  8. 34 CFR 682.414 - Records, reports, and inspection requirements for guaranty agency programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION (CONTINUED) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Administration of the Federal Family Education Loan Programs by a Guaranty... 34 Education 4 2014-07-01 2014-07-01 false Records, reports, and inspection requirements...

  9. 34 CFR 682.414 - Records, reports, and inspection requirements for guaranty agency programs.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION (CONTINUED) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Administration of the Federal Family Education Loan Programs by a Guaranty... 34 Education 4 2012-07-01 2012-07-01 false Records, reports, and inspection requirements...

  10. 34 CFR 682.515 - Records, reports, and inspection requirements for Federal GSL program lenders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Federal Guaranteed Student Loan Programs § 682.515 Records... 34 Education 4 2012-07-01 2012-07-01 false Records, reports, and inspection requirements for Federal GSL program lenders. 682.515 Section 682.515 Education Regulations of the Offices of...

  11. 34 CFR 682.515 - Records, reports, and inspection requirements for Federal GSL program lenders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Federal Guaranteed Student Loan Programs § 682.515 Records... 34 Education 4 2013-07-01 2013-07-01 false Records, reports, and inspection requirements for Federal GSL program lenders. 682.515 Section 682.515 Education Regulations of the Offices of...

  12. 34 CFR 682.515 - Records, reports, and inspection requirements for Federal GSL program lenders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Federal Guaranteed Student Loan Programs § 682.515 Records... 34 Education 4 2011-07-01 2011-07-01 false Records, reports, and inspection requirements for Federal GSL program lenders. 682.515 Section 682.515 Education Regulations of the Offices of...

  13. 34 CFR 682.414 - Records, reports, and inspection requirements for guaranty agency programs.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION (CONTINUED) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Administration of the Federal Family Education Loan Programs by a Guaranty... 34 Education 4 2011-07-01 2011-07-01 false Records, reports, and inspection requirements...

  14. 34 CFR 682.414 - Records, reports, and inspection requirements for guaranty agency programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION (CONTINUED) FEDERAL FAMILY EDUCATION LOAN (FFEL) PROGRAM Administration of the Federal Family Education Loan Programs by a Guaranty... 34 Education 4 2013-07-01 2013-07-01 false Records, reports, and inspection requirements...

  15. 40 CFR 63.7907 - What are my inspection and monitoring requirements for surface impoundments?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... impoundments? (a) If you use a floating membrane cover according to § 63.7905(b)(1), you must visually inspect the floating membrane cover and its closure devices at least annually according to the requirements in § 63.946(a). (b) If you use a cover vented to a control device according to § 63.7905(b)(2), you...

  16. 40 CFR 63.7907 - What are my inspection and monitoring requirements for surface impoundments?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... impoundments? (a) If you use a floating membrane cover according to § 63.7905(b)(1), you must visually inspect the floating membrane cover and its closure devices at least annually according to the requirements in § 63.946(a). (b) If you use a cover vented to a control device according to § 63.7905(b)(2), you...

  17. 46 CFR 115.801 - Notice of inspection deficiencies and requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... presents a serious safety hazard to the vessel or it's passengers or crew, and exists through negligence or... VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS... requirements. (a) If during the inspection of a vessel, the vessel or its equipment is found not to conform...

  18. 40 CFR 267.199 - What inspection requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... cathodic protection systems, if present, according to, at a minimum, the following schedule to ensure that they are functioning properly: (1) Confirm that the cathodic protection system is operating properly... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What inspection requirements must...

  19. 76 FR 27925 - Requirements for Maintenance of Inspections, Tests, Analyses, and Acceptance Criteria

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... COMMISSION 10 CFR Parts 2 and 52 RIN 3150-AI77 Requirements for Maintenance of Inspections, Tests, Analyses... maintenance period. Most recently, the NRC held two public meetings in March 2010 to discuss draft proposed... provides guidance to verify licensees have implemented ITAAC maintenance programs to ensure that...

  20. 34 CFR 682.414 - Records, reports, and inspection requirements for guaranty agency programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Records, reports, and inspection requirements for guaranty agency programs. 682.414 Section 682.414 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FEDERAL FAMILY...

  1. 12 CFR 925.8 - Subject to inspection and regulation requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... required by section 4(a)(1)(B) of the Act (12 U.S.C. 1424(a)(1)(B)) and § 925.6(a)(2) of this part, if, in... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Subject to inspection and regulation requirement. 925.8 Section 925.8 Banks and Banking FEDERAL HOUSING FINANCE BOARD FEDERAL HOME LOAN...

  2. The Institutionalization of Scientific Information: A Scientometric Model (ISI-S Model).

    ERIC Educational Resources Information Center

    Vinkler, Peter

    2002-01-01

    Introduces a scientometric model (ISI-S model) for describing the institutionalization process of scientific information. ISI-S describes the information and knowledge systems of scientific publications as a global network of interdependent information and knowledge clusters that are dynamically changing by their content and size. (Author/LRW)

  3. Qualification requirements of guided ultrasonic waves for inspection of piping in light water reactors

    SciTech Connect

    Meyer, R. M.; Ramuhalli, P.; Doctor, S. R.; Bond, L. J.

    2013-01-25

    It is anticipated that guided ultrasonic wave (GUW) techniques will eventually see widespread application in the nuclear power industry as there are several near-term and future needs that could benefit from the availability of GUW technologies. Already, GUW techniques are receiving consideration for inspecting buried piping at nuclear power plants and future applications may include several Class 1 and 2 components. To accept the results of a nondestructive examination of safety critical components, the U.S. Nuclear Regulatory Commission requires that the examinations be performed using qualified equipment, personnel, and procedures. As the use of GUW techniques becomes more frequent, qualification may be required. Performance demonstration has been the approach to qualifying conventional NDE methods in the nuclear power industry. This paper highlights potential issues and research needs associated with facilitating GUW qualification for the nuclear power industry. Parametric studies of essential inspection parameters are necessary to understand their influence on inspection performance. The large volume sampling capability introduces several challenges for qualifying GUW techniques including the quantification of performance, potential interference caused by the presence of multiple flaws in the inspection region, and the practicality of manufacturing several large qualification specimens. Computer simulation may have a significant role in reducing the experimental burden associated with qualifying GUW techniques for nuclear power plant examinations.

  4. Qualification requirements of guided ultrasonic waves for inspection of piping in light water reactors

    NASA Astrophysics Data System (ADS)

    Meyer, R. M.; Ramuhalli, P.; Doctor, S. R.; Bond, L. J.

    2013-01-01

    It is anticipated that guided ultrasonic wave (GUW) techniques will eventually see widespread application in the nuclear power industry as there are several near-term and future needs that could benefit from the availability of GUW technologies. Already, GUW techniques are receiving consideration for inspecting buried piping at nuclear power plants and future applications may include several Class 1 and 2 components. To accept the results of a nondestructive examination of safety critical components, the U.S. Nuclear Regulatory Commission requires that the examinations be performed using qualified equipment, personnel, and procedures. As the use of GUW techniques becomes more frequent, qualification may be required. Performance demonstration has been the approach to qualifying conventional NDE methods in the nuclear power industry. This paper highlights potential issues and research needs associated with facilitating GUW qualification for the nuclear power industry. Parametric studies of essential inspection parameters are necessary to understand their influence on inspection performance. The large volume sampling capability introduces several challenges for qualifying GUW techniques including the quantification of performance, potential interference caused by the presence of multiple flaws in the inspection region, and the practicality of manufacturing several large qualification specimens. Computer simulation may have a significant role in reducing the experimental burden associated with qualifying GUW techniques for nuclear power plant examinations.

  5. 49 CFR 365.511 - Requirement for CVSA inspection of vehicles during first three consecutive years of permanent...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Requirement for CVSA inspection of vehicles during... inspection of vehicles during first three consecutive years of permanent operating authority. A Mexico... Vehicle Safety Alliance (CVSA)-certified inspectors every three months and display a current...

  6. 49 CFR 365.511 - Requirement for CVSA inspection of vehicles during first three consecutive years of permanent...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Requirement for CVSA inspection of vehicles during... inspection of vehicles during first three consecutive years of permanent operating authority. A Mexico... Vehicle Safety Alliance (CVSA)-certified inspectors every three months and display a current...

  7. 49 CFR 365.511 - Requirement for CVSA inspection of vehicles during first three consecutive years of permanent...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Requirement for CVSA inspection of vehicles during... inspection of vehicles during first three consecutive years of permanent operating authority. A Mexico... Vehicle Safety Alliance (CVSA)-certified inspectors every three months and display a current...

  8. 49 CFR 365.511 - Requirement for CVSA inspection of vehicles during first three consecutive years of permanent...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Requirement for CVSA inspection of vehicles during... inspection of vehicles during first three consecutive years of permanent operating authority. A Mexico... Vehicle Safety Alliance (CVSA)-certified inspectors every three months and display a current...

  9. 49 CFR 365.511 - Requirement for CVSA inspection of vehicles during first three consecutive years of permanent...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Requirement for CVSA inspection of vehicles during... inspection of vehicles during first three consecutive years of permanent operating authority. A Mexico... Vehicle Safety Alliance (CVSA)-certified inspectors every three months and display a current...

  10. Light-ion-induced multifragmentation: The ISiS project

    NASA Astrophysics Data System (ADS)

    Viola, V. E.; Kwiatkowski, K.; Beaulieu, L.; Bracken, D. S.; Breuer, H.; Brzychczyk, J.; de Souza, R. T.; Ginger, D. S.; Hsi, W.-C.; Korteling, R. G.; Lefort, T.; Lynch, W. G.; Morley, K. B.; Legrain, R.; Pienkowski, L.; Pollacco, E. C.; Renshaw, E.; Ruangma, A.; Tsang, M. B.; Volant, C.; Wang, G.; Yennello, S. J.; Yoder, N. R.

    2006-11-01

    An extensive study of GeV light-ion-induced multifragmentation and its possible interpretation in terms of a nuclear liquid-gas phase transition has been performed with the Indiana Silicon Sphere (ISiS) 4π detector array. Measurements were performed with 5-15 GeV/ c p, pbar, and π- beams incident on 197Au and 2-5 GeV 3He incident on natAg and 197Au targets. Both the reaction dynamics and the subsequent decay of the heavy residues have been explored. The data provide evidence for a dramatic change in the reaction observables near an excitation energy of E*/A=4-5 MeV/residue nucleon. In this region, fragment multiplicities and energy spectra indicate emission from an expanded/dilute source on a very short time scale (20-50 fm/ c). These properties, along with caloric curve and scaling-law behavior, yield a pattern that is consistent with a nuclear liquid-gas phase transition.

  11. Options for Putting CDS/ISIS Databases on the Internet

    ERIC Educational Resources Information Center

    Buxton, Andrew

    2006-01-01

    Purpose: To review the variety of software solutions available for putting CDS/ISIS databases on the internet. To help anyone considering which route to take. Design/methodology/approach: Briefly describes the characteristics, history, origin and availability of each package. Identifies the type of skills required to implement the package and the…

  12. Performance of the ISIS Distributed Computing Toolkit

    DTIC Science & Technology

    1994-06-22

    Best Available Copy .. A a ~ d ~ . 1) - . Fs’A aiaer rnrgC"opyr~IL tI.ru~ Performance of the ISIS Distributed Computing Toolkit* Kenneth P. Birman...isis.com. Please cite as Technical Report TR-94-1432, Dept. of Computer Science, Cornell University. Performance of the Isis Distributed Computing Toolkit... Distributed computing , performance, process groups, atomic broadcast, causal and total message ordering, cbcast, abcast, multiple process groups

  13. Suppressed Carrier Synchronizers for ISI Channels

    NASA Technical Reports Server (NTRS)

    Hinedi, Sami M.; Simon, Marvin K.

    1996-01-01

    We demonstrate a class of suppressed carrier synchronization loops that are motivated by MAP estimation theory and in the presence of ISI outperform the conventional I-Q loop which is designed on the basis of zero ISI (wideband assumption). The measure of comparison used is the so-called.

  14. 36 CFR 1238.22 - What are the inspection requirements for permanent and unscheduled microform records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., producer, processor, format, and results of previous inspections. (d) The inspection must include the... classification, if any; and inclusive dates, names, or other data identifying the records on the unit of...

  15. 33 CFR 150.430 - What are the requirements for a declaration of inspection?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... in charge of cargo transfer and the person in charge (PIC) of cargo transfer for the deepwater port... inspect the tanker, and the PIC of cargo transfer for the deepwater port must inspect the deepwater...

  16. 7 CFR 52.24 - Where to file for an appeal inspection and information required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 PROCESSED FRUITS AND VEGETABLES, PROCESSED PRODUCTS THEREOF, AND CERTAIN OTHER PROCESSED FOOD PRODUCTS 1 Regulations Governing Inspection and...

  17. 33 CFR 150.430 - What are the requirements for a declaration of inspection?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in charge of cargo transfer and the person in charge (PIC) of cargo transfer for the deepwater port... inspect the tanker, and the PIC of cargo transfer for the deepwater port must inspect the deepwater...

  18. 33 CFR 150.430 - What are the requirements for a declaration of inspection?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in charge of cargo transfer and the person in charge (PIC) of cargo transfer for the deepwater port... inspect the tanker, and the PIC of cargo transfer for the deepwater port must inspect the deepwater...

  19. 33 CFR 150.430 - What are the requirements for a declaration of inspection?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in charge of cargo transfer and the person in charge (PIC) of cargo transfer for the deepwater port... inspect the tanker, and the PIC of cargo transfer for the deepwater port must inspect the deepwater...

  20. 33 CFR 150.430 - What are the requirements for a declaration of inspection?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in charge of cargo transfer and the person in charge (PIC) of cargo transfer for the deepwater port... inspect the tanker, and the PIC of cargo transfer for the deepwater port must inspect the deepwater...

  1. 9 CFR 354.161 - Requirements as to manner of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY INSPECTION AND CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF... shall include post-mortem examination of each rabbit carcass during the evisceration operation. (c)...

  2. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Semiannual report, October 1990--March 1991: Volume 13

    SciTech Connect

    Doctor, S.R.; Good, M.S.; Heasler, P.G.; Hockey, R.L.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V.

    1992-07-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to the Regulatory and ASME Code requirements, based on material properties, service conditions, and NDE uncertainties.

  3. Inspection Head Design for the In-Service Inspection of Fuel Channels of Pressurized Heavy Water Reactors

    SciTech Connect

    Haruray, Amit Kumar; Veerapur, R.D.; Puri, R.K.; Singh, Manjit

    2006-07-01

    This paper discusses the challenges associated with the mechanical design of Inspection Head for the in-service inspection (ISI) of fuel channels of Indian Pressurized Heavy Water Reactors (PHWRs). ISI is carried out during shut down period in the reactor. Non Destructive Examination (NDE) of fuel channels is a mandatory requirement to acquire knowledge about the structural condition. A typical 220 MWe Reactor-core consists of 306 horizontal fuel channel assemblies (tubular in shape). There are typical design challenges due to their horizontal nature, long length (each assembly is around 9 meters long), and high radiation. Because of combined effect of above mentioned factors, these fuel channels develop permanent downward sag during service. This sag has to be negotiated by the Inspection Head. The Inspection Head houses all the NDE sensors and is deployed in the fuel channel with the help of reactor fuelling machine. It is driven inside the fuel channel by a separate external drive-system, which is capable of linearly advancing, retracting as well as rotating it all-round to achieve full-volumetric inspection. The paper also discusses an important design feature in the Inspection Head, which helps in maintaining a fixed distance between NDE sensors and the internal surface (ID) of the fuel channel, to enable us to obtain reliable and consistent inspection results. This objective is achieved with the help of two specially designed leaf-spring loaded roller modules, which are assembled in the Inspection Head at its front and rear, with NDE Sensor Module sandwiched between them. Another very important design feature in the Inspection Head helps the Spring-Loaded Roller Modules in carrying out their intended function of maintaining fixed distance despite the weight of the long drive extension links attached at the rear of Inspection Head or deviations due to any other reason. There are multiple drive extension links attached at the rear of the Inspection Head as the

  4. Nondestructive examination (NDE) reliability for inservice inspection of light waters reactors

    SciTech Connect

    Doctor, S.R.; Deffenbaugh, J.D.; Good, M.S.; Green, E.R.; Heasler, P.G.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T. )

    1989-11-01

    Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other inspected components. This is a progress report covering the programmatic work from April 1988 through September 1988. 33 refs., 70 figs., 12 tabs.

  5. Nondestructive examination (NDE) reliability for inservice inspection of light water reactors

    SciTech Connect

    Doctor, S.R.; Good, M.S.; Heasler, P.G.; Hockey, R.L.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V. )

    1992-05-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other components inspected in accordance with Section 11 of the ASME Code. This is a progress report covering the programmatic work from October 1989 through September 1990.

  6. NESC Review of the 8-Foot High Temperature Tunnel (HTT) Oxygen Storage Pressure Vessel Inspection Requirements

    NASA Technical Reports Server (NTRS)

    Gilbert, Michael; Raju, Ivatury; Piascik, Robert; Cameron, Kenneth; Kirsch, Michael; Hoffman, Eric; Murthy, Pappu; Hopson, George; Greulich, Owen; Frazier, Wayne

    2009-01-01

    The 8-Foot HTT (refer to Figure 4.0-1) is used to conduct tests of air-breathing hypersonic propulsion systems at Mach numbers 4, 5, and 7. Methane, Air, and LOX are mixed and burned in a combustor to produce test gas stream containing 21 percent by volume oxygen. The NESC was requested by the NASA LaRC Executive Safety Council to review the rationale for a proposed change to the recertification requirements, specifically the internal inspection requirements, of the 8-Foot HTT LOX Run Tank and LOX Storage Tank. The Run Tank is an 8,000 gallon cryogenic tank used to provide LOX to the tunnel during operations, and is pressured during the tunnel run to 2,250 pounds per square inch gage (psig). The Storage Tank is a 25,000 gallon cryogenic tank used to store LOX at slightly above atmospheric pressure as a external shell, with space between the shells maintained under vacuum conditions.

  7. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine,...

  8. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine,...

  9. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine,...

  10. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine,...

  11. 30 CFR 18.96 - Preparation of machines for inspection; requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Preparation of machines for inspection... Field Approval of Electrically Operated Mining Equipment § 18.96 Preparation of machines for inspection... place at which a field approval investigation will be conducted with respect to any machine,...

  12. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., evidence of impending failure, or failure. All closures shall be in place while the test is made and the... sufficient time to permit inspection of the portable tank for leaks. The minimum test pressure for a portable... portable tank constructed in accordance with a DOT specification for which a test or inspection...

  13. 40 CFR 267.15 - What are my general inspection requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... follow a written schedule for inspecting, monitoring equipment, safety and emergency equipment, security devices, and operating and structural equipment (such as dikes and sump pumps) that are important to..., inoperative sump pump, leaking fitting, etc.). (3) The frequency of your inspections may vary for the items...

  14. 9 CFR 352.19 - Ante-mortem inspection and applicable requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION EXOTIC ANIMALS AND HORSES; VOLUNTARY INSPECTION Horses..., an official establishment that wishes to slaughter horses can apply for voluntary ante-mortem... made in pens on the premises of the establishment at which the horses are offered for slaughter...

  15. 9 CFR 352.19 - Ante-mortem inspection and applicable requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION EXOTIC ANIMALS AND HORSES; VOLUNTARY INSPECTION Horses..., an official establishment that wishes to slaughter horses can apply for voluntary ante-mortem... made in pens on the premises of the establishment at which the horses are offered for slaughter...

  16. 9 CFR 352.19 - Ante-mortem inspection and applicable requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION EXOTIC ANIMALS AND HORSES; VOLUNTARY INSPECTION Horses..., an official establishment that wishes to slaughter horses can apply for voluntary ante-mortem... made in pens on the premises of the establishment at which the horses are offered for slaughter...

  17. 9 CFR 352.19 - Ante-mortem inspection and applicable requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION EXOTIC ANIMALS AND HORSES; VOLUNTARY INSPECTION Horses..., an official establishment that wishes to slaughter horses can apply for voluntary ante-mortem... made in pens on the premises of the establishment at which the horses are offered for slaughter...

  18. 9 CFR 352.19 - Ante-mortem inspection and applicable requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AND VOLUNTARY INSPECTION AND CERTIFICATION EXOTIC ANIMALS AND HORSES; VOLUNTARY INSPECTION Horses..., an official establishment that wishes to slaughter horses can apply for voluntary ante-mortem... made in pens on the premises of the establishment at which the horses are offered for slaughter...

  19. 49 CFR 180.352 - Requirements for retest and inspection of IBCs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) The person performing the tests and inspections after the repair must durably mark the IBC near the manfacturer's UN design type marking to show the following: (A) The country in which the tests and inspections were performed; (B) The name or authorized symbol of the person performing the tests and...

  20. 49 CFR 180.352 - Requirements for retest and inspection of IBCs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... materials service until restored to the original design type of the IBC. (ii) Metal IBCs must be inspected...) The person performing the tests and inspections after the repair must durably mark the IBC near the manfacturer's UN design type marking to show the following: (A) The country in which the tests and...

  1. Extended ISIS sequences insensitive to T(1) smearing.

    PubMed

    Ljungberg, M; Starck, G; Vikhoff-Baaz, B; Alpsten, M; Ekholm, S; Forssell-Aronsson, E

    2000-10-01

    Image selected in vivo spectroscopy (ISIS) is a volume selection method often used for in vivo (31)P MRS, since it is suitable for measurements of substances with short T(2). However, ISIS can suffer from significant signal contributions caused by T(1) smearing from regions outside the VOI. A computer model was developed to simulate this contamination. The simulation results for the ISIS experiment order implemented in our MR system (ISIS-0) were in agreement with results obtained from phantom measurements. A new extended ISIS experiment order (E-ISIS) was developed, consisting of four "optimal" ISIS experiment orders (ISIS-1 to ISIS-4) performed consecutively with dummy ISIS experiments in between. The simulation results show that contamination due to T(1) smearing is, effectively, eliminated with E-ISIS and is significantly lower than for ISIS-0 and ISIS-1. E-ISIS offers increased accuracy for quantitative and qualitative determination of substances studied using in vivo MRS. Hence, E-ISIS can be valuable for both clinical and research applications.

  2. 46 CFR 35.01-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... territories and possessions, the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not... required, shall be issued by the certified marine chemist or the authorized person before the work...

  3. 46 CFR 35.01-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... territories and possessions, the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not... required, shall be issued by the certified marine chemist or the authorized person before the work...

  4. 46 CFR 35.01-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... territories and possessions, the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not... required, shall be issued by the certified marine chemist or the authorized person before the work...

  5. 42 CFR 493.1773 - Standard: Basic inspection requirements for all laboratories issued a CLIA certificate and CLIA...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... issued a certificate must permit CMS or a CMS agent to conduct an inspection to assess the laboratory's... procedures. (2) Permit interviews of all personnel concerning the laboratory's compliance with the applicable requirements of this part. (3) Permit laboratory personnel to be observed performing all phases of the...

  6. 42 CFR 493.1773 - Standard: Basic inspection requirements for all laboratories issued a CLIA certificate and CLIA...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... issued a certificate must permit CMS or a CMS agent to conduct an inspection to assess the laboratory's... procedures. (2) Permit interviews of all personnel concerning the laboratory's compliance with the applicable requirements of this part. (3) Permit laboratory personnel to be observed performing all phases of the...

  7. 42 CFR 493.1773 - Standard: Basic inspection requirements for all laboratories issued a CLIA certificate and CLIA...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... issued a certificate must permit CMS or a CMS agent to conduct an inspection to assess the laboratory's... procedures. (2) Permit interviews of all personnel concerning the laboratory's compliance with the applicable requirements of this part. (3) Permit laboratory personnel to be observed performing all phases of the...

  8. 46 CFR 35.01-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... safety, no alterations, repairs, or other such operations involving riveting, welding, burning, or like..., pumps, fittings, or other appurtenances connected to such cargo or fuel tanks. (c) Such inspections... safety, a certificate setting forth the fact in writing and qualified as may be required, shall be...

  9. 21 CFR 1316.07 - Requirement for administrative inspection warrant; exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) In situations involving inspection of conveyances where there is reasonable cause to obtain a warrant; (d) In any other exceptional or emergency circumstance or time or opportunity to apply for a...

  10. 30 CFR 250.919 - What in-service inspection requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... exposed to a natural occurrence (e.g., hurricane, earthquake, or tropical storm), the Regional Supervisor... of the inspections referred to in paragraph (b)(2) of this section, including a description of...

  11. Ultrasonic inspection reliability for intergranular stress corrosion cracks

    SciTech Connect

    Heasler, P G; Taylor, T T; Spanner, J C; Doctor, S R; Deffenbaugh, J D

    1990-07-01

    A pipe inspection round robin entitled Mini-Round Robin'' was conducted at Pacific Northwest Laboratory from May 1985 through October 1985. The research was sponsored by the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research under a program entitled Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors.'' The Mini-Round Robin (MRR) measured the intergranular stress corrosion (GSC) crack detection and sizing capabilities of inservice inspection (ISI) inspectors that had passed the requirements of IEB 83-02 and the Electric Power Research Institute (EPRI) sizing training course. The MRR data base was compared with an earlier Pipe Inspection Round Robin (PIRR) that had measured the performance of inservice inspection prior to 1982. Comparison of the MRR and PIRR data bases indicates no significant change in the inspection capability for detecting IGSCC. Also, when comparing detection of long and short cracks, no difference in detection capability was measured. An improvement in the ability to differentiate between shallow and deeper IGSCC was found when the MRR sizing capability was compared with an earlier sizing round robin conducted by the EPRI. In addition to the pipe inspection round robin, a human factors study was conducted in conjunction with the Mini-Round Robin. The most important result of the human factors study is that the Relative Operating Characteristics (ROC) curves provide a better methodology for describing inspector performance than only probability of detection (POD) or single-point crack/no crack data. 6 refs., 55 figs., 18 tabs.

  12. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Semiannual report, April 1992--September 1992: Volume 16

    SciTech Connect

    Doctor, S.R.; Diaz, A.A.; Friley, J.R.; Greenwood, M.S.; Heasler, P.G.; Kurtz, R.J.; Simonen, F.A.; Spanner, J.C.; Vo, T.V.

    1993-11-01

    The Evaluation and Improvement of NDE Reliability for Inservice inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs);using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to the Regulatory and ASME Code requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel and other components inspected in accordance with Section XI of the ASME Code. This is a programs report covering the programmatic work from April 1992 through September 1992.

  13. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Volume 14, Semiannual report, April 1991--September 1991

    SciTech Connect

    Doctor, S.R.; Diaz, A.A.; Friley, J.R.; Good, M.S.; Greenwood, M.S.; Heasler, P.G.; Hockey, R.L.; Kurtz, R.J.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V.

    1992-07-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWR`s); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to the Regulatory and ASME Code requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other components inspected in accordance with Section XI of the ASME Code. This is a progress report covering the programmatic work from April 1991 through September 1991.

  14. Nondestructive examination (NDE) reliability for inservice inspection of light water reactors. Annual report, October 1989--September 1990: Volume 12

    SciTech Connect

    Doctor, S.R.; Good, M.S.; Heasler, P.G.; Hockey, R.L.; Simonen, F.A.; Spanner, J.C.; Taylor, T.T.; Vo, T.V.

    1992-05-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other components inspected in accordance with Section 11 of the ASME Code. This is a progress report covering the programmatic work from October 1989 through September 1990.

  15. Nondestructive Examination (NDE) Reliability for Inservice Inspection of Light Water Reactors. Volume 15, Semiannual report: October 1991--March 1992

    SciTech Connect

    Doctor, S.R.; Diaz, A.A.; Friley, J.R.

    1993-09-01

    The Evaluation and Improvement of NDE Reliability for Inservice Inspection of Light Water Reactors (NDE Reliability) Program at the Pacific Northwest Laboratory was established by the Nuclear Regulatory Commission to determine the reliability of current inservice inspection (ISI) techniques and to develop recommendations that will ensure a suitably high inspection reliability. The objectives of this program include determining the reliability of ISI performed on the primary systems of commercial light-water reactors (LWRs); using probabilistic fracture mechanics analysis to determine the impact of NDE unreliability on system safety; and evaluating reliability improvements that can be achieved with improved and advanced technology. A final objective is to formulate recommended revisions to ASME Code and Regulatory requirements, based on material properties, service conditions, and NDE uncertainties. The program scope is limited to ISI of the primary systems including the piping, vessel, and other components inspected in accordance with Section XI of the ASME Code. This is a progress report covering the programmatic work from October 1991 through March 1992.

  16. ISI's Journal Citation Reports on the Web.

    PubMed

    Fitzpatrick, Roberta Bronson

    2003-01-01

    This column features an overview of the Institute for Scientific Information's (ISI) Journal Citation Reports (JCR) database. Basic searching techniques are presented, as well as simple ways to manipulate data contained in the file. The Journal Citation Reports database can provide information on highest impact journals, most frequently used journals, "hottest" journals, and largest journals in a field or discipline.

  17. Examining ISIS Support and Opposition Networks on Twitter

    DTIC Science & Technology

    2016-01-01

    publicly available Twitter data to examine this ongoing debate about ISIS on Arabic Twitter and to better understand the networks of ISIS...ongoing debate about ISIS on Arabic Twitter and to better understand the networks of ISIS supporters and opponents on Twitter. To support the...which funded this study via internal research funding. Any errors are the sole responsibility of the study authors. xvii Abbreviations Daesh Arabic

  18. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... DOT Specification 56 and 57 portable tanks, reclosing pressure relief devices must be removed from the... least the inspection and a pressure test according to paragraph (e) of this section. Pressure relief devices need not be tested or replaced unless there is reason to believe the relief devices have...

  19. 7 CFR 319.37-5 - Special foreign inspection and certification requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... microscopically inspected by the plant protection service of the country in which grown within 12 months preceding..., Germany, Great Britain, or The Netherlands and that the article was found by the plant protection service... determination by the plant protection service that the article is free of these diseases will be based on...

  20. 7 CFR 319.37-5 - Special foreign inspection and certification requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... microscopically inspected by the plant protection service of the country in which grown within 12 months preceding..., Germany, Great Britain, or The Netherlands and that the article was found by the plant protection service... determination by the plant protection service that the article is free of these diseases will be based on...

  1. 36 CFR 1238.22 - What are the inspection requirements for permanent and unscheduled microform records?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false What are the inspection... Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION RECORDS MANAGEMENT MICROFORMS RECORDS... reference, see § 1238.5); (2) A rereading of resolution targets; (3) A remeasurement of density; and (4)...

  2. 30 CFR 251.8 - Inspection and reporting requirements for activities under a permit.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... activities. You must allow MMS representatives to inspect your exploration or scientific research activities... final report of exploration or scientific research activities under a permit within 30 days after the... and blocks in which any exploration or permitted scientific research activities were...

  3. ISIS Electronics Flying on Korean LEO Satellites

    NASA Astrophysics Data System (ADS)

    Remy, S.; Mosset, E.; Park, Sungwoo

    2014-08-01

    Saft (Defense & Space, France), ASP (Advanced Space Power, Germany) and KARI (Korean Aerospace Research Institute, South Korea) developed an autonomous battery management system to carry out cell packages balancing, by-pass system activation and cell package discharge after failure detection. This high reliability electronics called ISIS (Intelligent Surveillance Integrated System) has been designed, tested and qualified in the frame of the Kompsat-3, Kompsat-5 and Kompsat-3A large LEO Korean KARI Satellites. Kompsat-3 and 3A (4.8 kWh battery) and Kompsat-5 (5.2 kWh battery equipped with a demanding imaging radar system) are powered during daily sun eclipses with respectively one 4P12S or 4P13S VES100 li-ion batteries managed by ISIS system.

  4. Pacific International Space Year (ISY) Conference

    NASA Astrophysics Data System (ADS)

    Rosendhal, Jeffrey D.

    The Pacific International Space Year (ISY) Conference was held on August 19-21, 1987, at the Mauna Lani Bay Hotel located on the Kohala Coast of the Island of Hawaii. The meeting was cosponsored by the Aerospace Industries Association o f America, AGU, the American Institute o f Aeronautics and Astronautics, the Institute of Electrical and Electronic Engineers, the Institute of Electronics, Information, and Communications Engineering, the Japanese Rocket Society, the Planetary Society, and the U.S./ISY Association and was hosted by the University of Hawaii. It was attended by more than 140 people drawn from the scientific communities and space agencies of eight countries, together with representatives from a number of international organizations.

  5. ISIS-B spacecraft magnetic tests

    NASA Technical Reports Server (NTRS)

    Boyle, J. C.

    1972-01-01

    Magnetic tests of the ISIS B spacecraft were conducted to determine the various magnetic moments of the spacecraft, evalute its spin and attitude control systems, and calibrate the six onboard magnetometer probes. Test procedures and equipment are described. Techniques for evaluting the data are discussed, and test results are presented. The spacecraft's magnetic characteristics were found to be satisfactory. Proper threshold values for gating the torquing coils were obtained. The onboard magnetometers were satisfactorily calibrated.

  6. ISIS-2 satellite imagery and auroral morphology

    NASA Technical Reports Server (NTRS)

    Anger, C. D.; Murphree, J. S.

    1976-01-01

    Auroral morphology is emphasized over auroral dynamics in a paper describing conspicuous auroral features picked up by the ISIS-2 scanning photometer. Results of improved programs designed to transform the data into a corrected geomagnetic coordinate frame and generate latitude profiles of auroral intensities at different magnetic local times are reported. The diffuse aurora and its relation to the morphology of discrete aurorae is given special attention.

  7. Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)

    SciTech Connect

    Brown, B.W.; Feige, E.J.; Galbraith, S.G.; Porter, A.M.

    1995-02-01

    This report presents the results of the evaluation of the Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan, Revision 0, submitted September 9, 1993, including the requests for relief from the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code, Section XI, requirements that the licensee has determined to be impractical. The Turkey Point Nuclear Power Plant, Units 3 and 4, Third 10-Year Interval Inservice Inspection Program Plan is evaluated in Section 2 of this report. The inservice inspection (ISI) program plan is evaluated for (a) compliance with the appropriate edition/addenda of Section XI, (b) acceptability of the examination sample, (c) correctness of the application of system or component examination exclusion criteria, and (d) compliance with ISI-related commitments identified during previous Nuclear Regulatory Commission (NRC) reviews. The requests for relief are evaluated in Section 3 of this report.

  8. Risk based ASME Code requirements

    SciTech Connect

    Gore, B.F.; Vo, T.V.; Balkey, K.R.

    1992-09-01

    The objective of this ASME Research Task Force is to develop and to apply a methodology for incorporating quantitative risk analysis techniques into the definition of in-service inspection (ISI) programs for a wide range of industrial applications. An additional objective, directed towards the field of nuclear power generation, is ultimately to develop a recommendation for comprehensive revisions to the ISI requirements of Section XI of the ASME Boiler and Pressure Vessel Code. This will require development of a firm technical basis for such requirements, which does not presently exist. Several years of additional research will be required before this can be accomplished. A general methodology suitable for application to any industry has been defined and published. It has recently been refined and further developed during application to the field of nuclear power generation. In the nuclear application probabilistic risk assessment (PRA) techniques and information have been incorporated. With additional analysis, PRA information is used to determine the consequence of a component rupture (increased reactor core damage probability). A procedure has also been recommended for using the resulting quantified risk estimates to determine target component rupture probability values to be maintained by inspection activities. Structural risk and reliability analysis (SRRA) calculations are then used to determine characteristics which an inspection strategy must posess in order to maintain component rupture probabilities below target values. The methodology, results of example applications, and plans for future work are discussed.

  9. Space construction requirements for joining, inspection, development testing, and flight checkout

    NASA Technical Reports Server (NTRS)

    Morgenthaler, George W.; Nii, Kendall M.

    1990-01-01

    Space construction poses new challenges not yet met in the space program to date. New materials: High strength to weight ratio metal matrix composites and other kinds of composites have been developed. They have not been fully characterized as regards rolling, drilling, cutting, forming, joining, etc. New joining methods: Many types of joining methods are proposed for use in space construction. It is important to understand the key discriminators in choosing one method over another. Once the discriminators are known, one can rank the various methods of joining or connecting things in space. New constructors: Astronauts frequently mention that EVA effort is very exhausting because of the suit inflexibility. For these reasons, as well as the inherent risk, hazards due to radiation, and other concerns mentioned in the literature, it is likely that robot workers of various sorts will play a key role. Now one must consider the question of qualifying space joining methods that will be applied by robots as well as those being applied by humans. New NDE methods/space qualification of detectors: For every joining method that is used here on earth, there are various non-destructive inspection techniques, such as ultrasonic inspection and x-ray inspection. It will be necessary to develop inspection techniques for all joining methods that will be approved for use in space. The detector must also be space qualified. Development testing: As a new concept for space habitat goes through its conceptual phases, various development tests are anticipated for the first time. Some elements cannot be adequately tested except in space itself. Flight check-out: Assuming that one is assembling the Mars spacecraft in earth orbit and that all of the preceding questions have been resolved, the day finally arrives when the fully assembled vehicle is ready for occupancy and journeying to Mars. It will be necessary to conduct a final flight readiness review, countdown procedure, and certification

  10. In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements

    SciTech Connect

    Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

    2012-09-17

    Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded

  11. Functional description of the ISIS system

    NASA Technical Reports Server (NTRS)

    Berman, W. J.

    1979-01-01

    Development of software for avionic and aerospace applications (flight software) is influenced by a unique combination of factors which includes: (1) length of the life cycle of each project; (2) necessity for cooperation between the aerospace industry and NASA; (3) the need for flight software that is highly reliable; (4) the increasing complexity and size of flight software; and (5) the high quality of the programmers and the tightening of project budgets. The interactive software invocation system (ISIS) which is described is designed to overcome the problems created by this combination of factors.

  12. The ISIS pre-injector reconfiguration

    NASA Astrophysics Data System (ADS)

    Wood, T.; Faircloth, D. C.; Lawrie, S. R.; Letchford, A. P.; Whitehead, M. O.; Pike, T.; Perkins, M.

    2016-02-01

    With the introduction of a new "low energy beams" group at ISIS, the decision was taken to expand the ion source area. This paper will explain what actions were taken, how this has improved the present working environment and how the space will be used to accommodate a medium energy beam transport (MEBT) section after the existing radio-frequency quadrupole. The MEBT will incorporate three 202.5 MHz re-bunching cavities and will achieve a transmission of 96% with minimal emittance growth.

  13. Magnetospheric whistler ducts observed by ISIS satellites

    NASA Technical Reports Server (NTRS)

    Ondoh, T.

    1976-01-01

    The latitudinal width of the magnetospheric whistler duct has been estimated by the first and final invariant latitudes of whistler echoes and the conservation of the magnetic flux for the centered dipole field, using 105 whistler echoes in ISIS VLF data received at Kashima, Japan for 1972-1973. The latitudinal distribution of whistler duct occurrence shows a maximum at invariant latitudes of 40-45 degrees near the maximum occurrence latitude of ground whistlers. The radial width of magnetospheric whistler duct in the geomagnetically equatorial plane increases with invariant latitude of the geomagnetic flux tube in which whistlers propagate.

  14. The ISIS pre-injector reconfiguration.

    PubMed

    Wood, T; Faircloth, D C; Lawrie, S R; Letchford, A P; Whitehead, M O; Pike, T; Perkins, M

    2016-02-01

    With the introduction of a new "low energy beams" group at ISIS, the decision was taken to expand the ion source area. This paper will explain what actions were taken, how this has improved the present working environment and how the space will be used to accommodate a medium energy beam transport (MEBT) section after the existing radio-frequency quadrupole. The MEBT will incorporate three 202.5 MHz re-bunching cavities and will achieve a transmission of 96% with minimal emittance growth.

  15. The ISIS pre-injector reconfiguration

    SciTech Connect

    Wood, T. Faircloth, D. C.; Lawrie, S. R.; Letchford, A. P.; Whitehead, M. O.; Pike, T.; Perkins, M.

    2016-02-15

    With the introduction of a new “low energy beams” group at ISIS, the decision was taken to expand the ion source area. This paper will explain what actions were taken, how this has improved the present working environment and how the space will be used to accommodate a medium energy beam transport (MEBT) section after the existing radio-frequency quadrupole. The MEBT will incorporate three 202.5 MHz re-bunching cavities and will achieve a transmission of 96% with minimal emittance growth.

  16. The Treatment of ISI Uncertainty in xLPR

    SciTech Connect

    Heasler, Patrick G.; Sanborn, Scott E.; Doctor, Steven R.; Anderson, Michael T.

    2011-08-01

    The U.S. Nuclear Regulatory Commission (NRC) in cooperation with the nuclear industry is constructing an improved probabilistic fracture model for 'extremely Low Probability of Rupture' in the piping of a nuclear power plant called xLPR. This paper focuses on the xLPR model's treatment of uncertainty for in-service inspection. In the xLPR model, uncertainty is classified as either aleatory or epistemic, and both types of uncertainty are described with probability distributions. Earlier PFM models included aleatory, but ignored epistemic, uncertainty, or attempted to deal with epistemic uncertainty by use of conservative bounds. Thus, inclusion of both types of uncertainty in xLPR should produce more realistic results than the earlier models. This work shows that by including epistemic uncertainty in the xLPR ISI module, there can be a significant effect on rupture probability; however, this depends upon the specific scenarios being studied. Some simple scenarios are presented to illustrate those where there is no effect and those having a significant effect on the probability of rupture.

  17. Tank Inspection NDE Results for Fiscal Year 2014, Waste Tanks 26, 27, 28 and 33

    SciTech Connect

    Elder, J.; Vandekamp, R.

    2014-09-29

    Ultrasonic nondestructive examinations (NDE) were performed on waste storage tanks 26, 27, 28 and 33 at the Savannah River Site as a part of the “In-Service Inspection (ISI) Program for High Level Waste Tanks.” No reportable conditions were identified during these inspections. The results indicate that the implemented corrosion control program continues to effectively mitigate corrosion in the SRS waste tanks. Ultrasonic inspection (UT) is used to detect general wall thinning, pitting and interface attack, as well as vertically oriented cracks through inspection of an 8.5 inch wide strip extending over the accessible height of the primary tank wall and accessible knuckle regions. Welds were also inspected in tanks 27, 28 and 33 with no reportable indications. In a Type III/IIIA primary tank, a complete vertical strip includes scans of five plates (including knuckles) so five “plate/strips” would be completed at each vertical strip location. In FY 2014, a combined total of 79 plate/strips were examined for thickness mapping and crack detection, equating to over 45,000 square inches of area inspected on the primary tank wall. Of the 79 plate/strips examined in FY 2014 all but three have average thicknesses that remain at or above the construction minimum thickness which is nominal thickness minus 0.010 inches. There were no service induced reportable thicknesses or cracking encountered. A total of 2 pits were documented in 2014 with the deepest being 0.032 inches deep. One pit was detected in Tank 27 and one in Tank 33. No pitting was identified in Tanks 26 or 28. The maximum depth of any pit encountered in FY 2014 is 5% of nominal thickness, which is less than the minimum reportable criteria of 25% through-wall for pitting. In Tank 26 two vertical strips were inspected, as required by the ISI Program, due to tank conditions being outside normal chemistry controls for more than 3 months. Tank 28 had an area of localized thinning on the exterior wall of the

  18. Automated Processing of ISIS Topside Ionograms into Electron Density Profiles

    NASA Technical Reports Server (NTRS)

    Reinisch, bodo W.; Huang, Xueqin; Bilitza, Dieter; Hills, H. Kent

    2004-01-01

    Modeling of the topside ionosphere has for the most part relied on just a few years of data from topside sounder satellites. The widely used Bent et al. (1972) model, for example, is based on only 50,000 Alouette 1 profiles. The International Reference Ionosphere (IRI) (Bilitza, 1990, 2001) uses an analytical description of the graphs and tables provided by Bent et al. (1972). The Alouette 1, 2 and ISIS 1, 2 topside sounder satellites of the sixties and seventies were ahead of their times in terms of the sheer volume of data obtained and in terms of the computer and software requirements for data analysis. As a result, only a small percentage of the collected topside ionograms was converted into electron density profiles. Recently, a NASA-funded data restoration project has undertaken and is continuing the process of digitizing the Alouette/ISIS ionograms from the analog 7-track tapes. Our project involves the automated processing of these digital ionograms into electron density profiles. The project accomplished a set of important goals that will have a major impact on understanding and modeling of the topside ionosphere: (1) The TOPside Ionogram Scaling and True height inversion (TOPIST) software was developed for the automated scaling and inversion of topside ionograms. (2) The TOPIST software was applied to the over 300,000 ISIS-2 topside ionograms that had been digitized in the fkamework of a separate AISRP project (PI: R.F. Benson). (3) The new TOPIST-produced database of global electron density profiles for the topside ionosphere were made publicly available through NASA s National Space Science Data Center (NSSDC) ftp archive at . (4) Earlier Alouette 1,2 and ISIS 1, 2 data sets of electron density profiles from manual scaling of selected sets of ionograms were converted fiom a highly-compressed binary format into a user-friendly ASCII format and made publicly available through nssdcftp.gsfc.nasa.gov. The new database for the topside

  19. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 12 2013-07-01 2013-07-01 false Wastewater-Inspection and Monitoring... Production Pt. 63, Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring....1256(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper...

  20. 40 CFR Table 7 to Subpart Ggg of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 12 2014-07-01 2014-07-01 false Wastewater-Inspection and Monitoring... Production Pt. 63, Subpt. GGG, Table 7 Table 7 to Subpart GGG of Part 63—Wastewater—Inspection and Monitoring....1256(b)(7)63.1256(b)(8) Inspect wastewater tank for control equipment failures and improper...

  1. 7 CFR 29.40 - Mandatory inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... INSPECTION Regulations Definitions § 29.40 Mandatory inspection. Inspection authorized or required under section 5 of the Act or Section 759 of the Appropriations Act. definitions...

  2. 46 CFR 115.801 - Notice of inspection deficiencies and requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the requirements of law or the regulations in this subchapter, the marine inspector will point out... thereof. Normally, the marine inspector will list all such requirements that have not been completed and... presents a serious safety hazard to the vessel or it's passengers or crew, and exists through negligence...

  3. The Goodness of Simultaneous Fits in ISIS

    NASA Astrophysics Data System (ADS)

    Kühnel, Matthias; Falkner, Sebastian; Grossberger, Christoph; Ballhausen, Ralf; Dauser, Thomas; Schwarm, Fritz-Walter; Kreykenbohm, Ingo; Nowak, Michael A.; Pottschmidt, Katja; Ferrigno, Carlo; Rothschild, Richard E.; Martínez-Núñez, Silvia; Torrejón, José Miguel; Fürst, Felix; Klochkov, Dmitry; Staubert, Rüdiger; Kretschmar, Peter; Wilms, Jörn

    2016-02-01

    In a previous work, we introduced a tool for analyzing multiple datasets simultaneously, which has been implemented into ISIS. This tool was used to fit many spectra of X-ray binaries. However, the large number of degrees of freedom and individual datasets raise an issue about a good measure for a simultaneous fit quality. We present three ways to check the goodness of these fits: we investigate the goodness of each fit in all datasets, we define a combined goodness exploiting the logical structure of a simultaneous fit, and we stack the fit residuals of all datasets to detect weak features. These tools are applied to all RXTE-spectra from GRO 1008-57, revealing calibration features that are not detected significantly in any single spectrum. Stacking the residuals from the best-fit model for the Vela X-1 and XTE J1859+083 data evidences fluorescent emission lines that would have gone undetected otherwise.

  4. 46 CFR 176.801 - Notice of inspection deficiencies and requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... marine inspector will point out deficiencies observed and discuss all requirements with the owner, managing operator, or a representative thereof. Normally, the marine inspector will list all such... representative thereof. However, when a deficiency presents a serious safety hazard to the vessel or...

  5. 30 CFR 250.446 - What are the BOP maintenance and inspection requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.446 What are the BOP... for Drilling Wells (as incorporated by reference in § 250.198). You must document the procedures...

  6. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... by a third party who is a registered architect, a professional engineer, or a tradesman or contractor.... Registered architects and professional engineers generally must have a minimum of 10 years of documented... occupancy. \\3\\ Each State establishes the licensing requirements for professional engineers and...

  7. 49 CFR 180.605 - Requirements for periodic testing, inspection and repair of portable tanks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., heavy oil, or other material suitable for the purpose of detecting leaks. The pressure must be held for... if it is possible to maintain the required test pressure at constant temperature with the tank... completely filling the tank with water or other liquid having a similar viscosity, the temperature of...

  8. 14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND... crewmember training, evaluation, or flight experience to meet any of the requirements of this chapter unless... or allow the use of or offer the use of an FSTD for flight crewmember training or evaluation or...

  9. 14 CFR 60.19 - Inspection, continuing qualification evaluation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... following: (1) Maintains a discrepancy log. (2) Ensures that, when a discrepancy is discovered, the following requirements are met: (i) A description of each discrepancy is entered in the log and remains in the log until the discrepancy is corrected as specified in § 60.25(b). (ii) A description of...

  10. Software Formal Inspections Standard

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Software Formal Inspections Standard (hereinafter referred to as Standard) is applicable to NASA software. This Standard defines the requirements that shall be fulfilled by the software formal inspections process whenever this process is specified for NASA software. The objective of this Standard is to define the requirements for a process that inspects software products to detect and eliminate defects as early as possible in the software life cycle. The process also provides for the collection and analysis of inspection data to improve the inspection process as well as the quality of the software.

  11. Maritime Security: Coast Guard Should Conduct Required Inspections of Offshore Energy Infrastructure

    DTIC Science & Technology

    2011-10-01

    Coast Guard Security Requirements Applicable to MODUs Operating in U.S. Federal Waters 34 Figure 4: Aftermath of the Explosion of the Deepwater...Horizon Oil Spill and Offshore Drilling, Deep Water : The Gulf Oil Disaster and the Future of Offshore Drilling (Washington D.C.: January 2011). Page...shallower state waters combined (see fig. 1 for a photograph of an OCS facility in the Gulf of Mexico).19 In addition, the LOOP is responsible for

  12. An evaluation of the Interactive Software Invocation System (ISIS) for software development applications. [flight software

    NASA Technical Reports Server (NTRS)

    Noland, M. S.

    1981-01-01

    The Interactive Software Invocation System (ISIS), which allows a user to build, modify, control, and process a total flight software system without direct communications with the host computer, is described. This interactive data management system provides the user with a file manager, text editor, a tool invoker, and an Interactive Programming Language (IPL). The basic file design of ISIS is a five level hierarchical structure. The file manager controls this hierarchical file structure and permits the user to create, to save, to access, and to purge pages of information. The text editor is used to manipulate pages of text to be modified and the tool invoker allows the user to communicate with the host computer through a RUN file created by the user. The IPL is based on PASCAL and contains most of the statements found in a high-level programming language. In order to evaluate the effectiveness of the system as applied to a flight project, the collection of software components required to support the Annular Suspension and Pointing System (ASPS) flight project were integrated using ISIS. The ASPS software system and its integration into ISIS is described.

  13. A classification of the ISIS program using Bloom's cognitive taxonomy

    NASA Astrophysics Data System (ADS)

    Clevenstine, Richard F.

    This article focuses on the practical use of Bloom's Taxonomy of Educational Objectives. The current status of analyzing and classifying test items and behavioral objectives was examined in this study. Specifically, the purpose of this study was to analyze and classify the ISIS minicourse performance objectives and criterion-referenced test items according to Bloom's cognitive Taxonomy in order to determine what levels of cognition the ISIS instructional materials are directed. The performance objectives and test items of thirty-three ISIS minicourses and criterion-referenced tests were collected and classified. Four research questions were posed in the study. The findings indicate that ISIS minicourse test items and performance objectives are written primarily at the Knowledge and Comprehension levels. The ISIS instructional materials reflect low percentages of upper cognitive level test items and performance objectives. Based upon the use of a chi-square analysis, twenty-four of the ISIS minicourses and tests demonstrate a positive congruence between their performance objectives and criterion-referenced test items. Nine ISIS minicourses were found to demonstrate a negative relationship between their performance objectives and test items. Implications and Recommendations based on the findings of the studies are provided.

  14. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 9 2011-07-01 2011-07-01 false Wastewater-Inspection and Monitoring... Operations, and Wastewater Pt. 63, Subpt. G, Table 11 Table 11 to Subpart G of Part 63—Wastewater—Inspection... wastewater tank for control equipment failures and improper work practices Initially Semi-annually...

  15. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Wastewater-Inspection and Monitoring... Operations, and Wastewater Pt. 63, Subpt. G, Table 11 Table 11 to Subpart G of Part 63—Wastewater—Inspection... wastewater tank for control equipment failures and improper work practices Initially Semi-annually...

  16. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 10 2014-07-01 2014-07-01 false Wastewater-Inspection and Monitoring... Operations, and Wastewater Pt. 63, Subpt. G, Table 11 Table 11 to Subpart G of Part 63—Wastewater—Inspection... wastewater tank for control equipment failures and improper work practices Initially Semi-annually...

  17. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Wastewater-Inspection and Monitoring... Operations, and Wastewater Pt. 63, Subpt. G, Table 11 Table 11 to Subpart G of Part 63—Wastewater—Inspection... wastewater tank for control equipment failures and improper work practices Initially Semi-annually...

  18. 46 CFR 189.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... can be undertaken with safety, no alterations, repairs, or other such operations involving riveting... liquids or within spaces adjacent to such tanks; or, (5) To pipelines, heat coils, pumps, fittings, or... inspection. If the inspection indicates that such operations can be undertaken with safety, a...

  19. ISIS-II Scanning Auroral Photometer.

    PubMed

    Anger, C D; Fancott, T; McNally, J; Kerr, H S

    1973-08-01

    The ISIS-II dual wavelength scanning auroral photometer is designed to map the distribution of auroral emissions at 5577 A and 3914 A over the portion of the dark earth visible to the spacecraft. A combination of internal electronic scanning and the natural orbital and rotational motions of the spacecraft causes a dual wavelength photometer to be scanned systematically across the earth. The data will be reproduced directly in the form of separate pictures representing emissions at each wavelength, which will be used to study the large-scale distribution and morphology of auroras, to study the ratio of 3914-A and 5577-A emissions thought to depend upon the energies of exciting particles), and to compare with results from other instruments on board the spacecraft and on the ground. The Red Line Photometer experiment on the same spacecraft is described in an accompanying paper by Shepherd et al. [Appl. Opt. 12, 1767 (1973)]. The instrument can be thought of as the photometric equivalent of an all-sky color camera which will view the aurora from above instead of below and with a much wider vantage point unobstructed by cloud and haze. In one satellite pass, the instrument will be capable of surveying (in one hemisphere) the entire polar region in which auroras normally occur.

  20. The Isis project: Fault-tolerance in large distributed systems

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth P.; Marzullo, Keith

    1993-01-01

    This final status report covers activities of the Isis project during the first half of 1992. During the report period, the Isis effort has achieved a major milestone in its effort to redesign and reimplement the Isis system using Mach and Chorus as target operating system environments. In addition, we completed a number of publications that address issues raised in our prior work; some of these have recently appeared in print, while others are now being considered for publication in a variety of journals and conferences.

  1. ISIS Processing Tools for Thermal Emission Spectrometer Data

    NASA Technical Reports Server (NTRS)

    Becker, K.; Johnson, J. R.; Gaddis, L.

    2003-01-01

    The Integrated Software for Imagers and Spectrometers (ISIS) package is a widely used planetary data processing and cartography software system produced by the Astrogeology program of the USGS in Flagstaff, AZ. Recent additions to the ISIS system provide useful tools for extracting and projecting Thermal Emission Spectrometer (TES) data for use with other ISIS programs to process, analyze, and visualize these data, particularly in comparison with other Mars data sets. A general overview of various programs and tools used for extracting and processing TES data are presented.

  2. Ion mass spectrometer experiment for ISIS-2 spacecraft

    NASA Technical Reports Server (NTRS)

    Hoffman, John H.

    1987-01-01

    The International Satellite for Ionospheric Studies (ISIS) program of NASA was the longest duration program in NASA history. A number of satellites were flown under this program, the last being called ISIS-2, which was launched on April 1, 1971 and operated successfully for over 13 years. An experiment called the Ion Mass Spectrometer (IMS) was flown on the ISIS-2 spacecraft. It operated for 10 years providing a large data base of positive ion composition and ion flow velocities along the orbit of the satellite, the latter being circular at 1400 km with a 90 degree inclination. The data were processed and reside in the National Space Sciences Data Center.

  3. An evaluation of human factors research for ultrasonic inservice inspection

    SciTech Connect

    Pond, D.J.; Donohoo, D.T.; Harris, R.V. Jr.

    1998-03-01

    This work was undertaken to determine if human factors research has yielded information applicable to upgrading requirements in ASME Boiler and Pressure Vessel Code Section XI, improving methods and techniques in Section V, and/or suggesting relevant research. A preference was established for information and recommendations which have become accepted and standard practice. Manual Ultrasonic Testing/Inservice Inspection (UT/ISI) is a complex task subject to influence by dozens of variables. This review frequently revealed equivocal findings regarding effects of environmental variables as well as repeated indications that inspection performance may be more, and more reliably, influenced by the workers` social environment, including managerial practices, than by other situational variables. Also of significance are each inspector`s relevant knowledge, skills, and abilities, and determination of these is seen as a necessary first step in upgrading requirements, methods, and techniques as well as in focusing research in support of such programs, While understanding the effects and mediating mechanisms of the variables impacting inspection performance is a worthwhile pursuit for researchers, initial improvements in industrial UTASI performance may be achieved by implementing practices already known to mitigate the effects of potentially adverse conditions. 52 refs., 2 tabs.

  4. Software Formal Inspections Guidebook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  5. The ISIS project: Fault-tolerance in large distributed systems

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth P.; Marzullo, Keith

    1990-01-01

    The semi-annual status report covers activities of the ISIS project during the second half of 1989. The project had several independent objectives: (1) At the level of the ISIS Toolkit, ISIS release V2.0 was completed, containing bypass communication protocols. Performance of the system is greatly enhanced by this change, but the initial software release is limited in some respects. (2) The Meta project focused on the definition of the Lomita programming language for specifying rules that monitor sensors for conditions of interest and triggering appropriate reactions. This design was completed, and implementation of Lomita is underway on the Meta 2.0 platform. (3) The Deceit file system effort completed a prototype. It is planned to make Deceit available for use in two hospital information systems. (4) A long-haul communication subsystem project was completed and can be used as part of ISIS. This effort resulted in tools for linking ISIS systems on different LANs together over long-haul communications lines. (5) Magic Lantern, a graphical tool for building application monitoring and control interfaces, is included as part of the general ISIS releases.

  6. ISIS and Social Media: The Combatant Commander’s Guide to Countering ISIS’s Social Media Campaign

    DTIC Science & Technology

    2015-06-07

    ISIS Five-Point Plan to Getting Round Suspension of Social Media Accounts: Get on Russian Version of Facebook , avoid YouTube and Hack Western TV...accounts-Get-Russian-version- Facebook -avoid-YouTube- hack -western-TV- channels.html. Corman, Steven, H.L. Goodall, JR, and Angela Trethewey...3 2 Facebook Penetration in Arab Countries 4 3 ISIS Social Media Post: The Execution of James Foley 7 4 Tweet

  7. Improving the Automatic Inversion of Digital ISIS-2 Ionogram Reflection Traces into Topside Vertical Electron-Density Profiles

    NASA Technical Reports Server (NTRS)

    Benson, R. F.; Truhlik, V.; Huang, X.; Wang, Y.; Bilitza, D.

    2011-01-01

    The topside-sounders on the four satellites of the International Satellites for Ionospheric Studies (ISIS) program were designed as analog systems. The resulting ionograms were displayed on 35-mm film for analysis by visual inspection. Each of these satellites, launched between 1962 and 1971, produced data for 10 to 20 years. A number of the original telemetry tapes from this large data set have been converted directly into digital records. Software, known as the TOPside Ionogram Scalar with True-height (TOPIST) algorithm has been produced that enables the automatic inversion of ISIS-2 ionogram reflection traces into topside vertical electron-density profiles Ne(h). More than million digital Alouette/ISIS topside ionograms have been produced and over 300,000 are from ISIS 2. Many of these ISIS-2 ionograms correspond to a passive mode of operation for the detection of natural radio emissions and thus do not contain ionospheric reflection traces. TOPIST, however, is not able to produce Ne(h) profiles from all of the ISIS-2 ionograms with reflection traces because some of them did not contain frequency information. This information was missing due to difficulties encountered during the analog-to-digital conversion process in the detection of the ionogram frame-sync pulse and/or the frequency markers. Of the many digital topside ionograms that TOPIST was able to process, over 200 were found where direct comparisons could be made with Ne(h) profiles that were produced by manual scaling in the early days of the ISIS program. While many of these comparisons indicated excellent agreement (<10% average difference over the entire profile) there were also many cases with large differences (more than a factor of two). Here we will report on two approaches to improve the automatic inversion process: (1) improve the quality of the digital ionogram database by remedying the missing frequency-information problem when possible, and (2) using the above-mentioned comparisons as

  8. 40 CFR 763.176 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Prohibition of the Manufacture, Importation, Processing, and Distribution in Commerce of Certain Asbestos-Containing Products; Labeling Requirements § 763.176 Inspections. The Agency will conduct inspections...

  9. Results of inspection and cleaning of two radionuclide air-sampling systems based on the requirements of ANSI/HPS N13.1-1999.

    PubMed

    Barnett, J M; Ballinger, M Y; Gervais, T L; Douglas, D D; Edwards, D L

    2004-04-01

    The Pacific Northwest National Laboratory inspected and cleaned two radionuclide air-sampling systems that continuously monitor radioactive air emissions from research and development facilities. The inspection and cleaning was performed to evaluate effective methods and potential cost impacts of maintenance requirements in the revised American National Standard Institute standard Sampling and Monitoring Releases of Airborne Radioactive Substances from the Stacks and Ducts of Nuclear Facilities. The standard requires at least annual inspections of sampling systems followed by cleaning if deposits are visible. During 2001 and 2002, inspections were performed leaving the sampling systems in place and inserting videoscope cables into different access points to allow viewing of the inside and outside of sampling manifolds and transport lines. Cleaning was performed on one of the systems by disconnecting and extracting the sampling manifold, then washing it with de-ionized water and scrub brushes. The wash water was analyzed for radioactivity and solids. Results of the inspection showed greater deposition in one of the systems than would be expected by a High Efficiency Particulate Air (HEPA) filtered exhaust stream, possibly due to accumulation of dust from a short period when unfiltered air was exhausted from construction areas. The second system was also downstream of HEPA filters and appeared much cleaner. The videoscope was a useful and cost-effective tool and provided a better view than could be obtained with the naked eye. However, because even small amounts of deposition were made visible with the videoscope, clarification is needed in defining when probe washing is merited, particularly in existing sampling systems whose design is not conducive to easy removal and cleaning.

  10. 49 CFR 396.17 - Periodic inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MAINTENANCE § 396.17 Periodic inspection. (a) Every commercial motor vehicle must be inspected as required by... least once during the preceding 12 months and documentation of such inspection is on the vehicle. The... annual inspection for vehicles under the carrier's control which are not subject to an inspection...

  11. 49 CFR 396.17 - Periodic inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MAINTENANCE § 396.17 Periodic inspection. (a) Every commercial motor vehicle must be inspected as required by... least once during the preceding 12 months and documentation of such inspection is on the vehicle. The... annual inspection for vehicles under the carrier's control which are not subject to an inspection...

  12. 49 CFR 396.17 - Periodic inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MAINTENANCE § 396.17 Periodic inspection. (a) Every commercial motor vehicle must be inspected as required by... least once during the preceding 12 months and documentation of such inspection is on the vehicle. The... annual inspection for vehicles under the carrier's control which are not subject to an inspection...

  13. 49 CFR 396.17 - Periodic inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MAINTENANCE § 396.17 Periodic inspection. (a) Every commercial motor vehicle must be inspected as required by... least once during the preceding 12 months and documentation of such inspection is on the vehicle. The... annual inspection for vehicles under the carrier's control which are not subject to an inspection...

  14. 46 CFR 91.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... possessions the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not reasonably available, the... by the certified marine chemist or the authorized person before the work is started....

  15. 46 CFR 91.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... possessions the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not reasonably available, the... by the certified marine chemist or the authorized person before the work is started....

  16. 46 CFR 91.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... possessions the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not reasonably available, the... by the certified marine chemist or the authorized person before the work is started....

  17. 46 CFR 91.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... possessions the inspection shall be made by a marine chemist certificated by the National Fire Protection Association; however, if the services of such certified marine chemist are not reasonably available, the... by the certified marine chemist or the authorized person before the work is started....

  18. 40 CFR Table 11 to Subpart G of... - Wastewater-Inspection and Monitoring Requirements for Waste Management Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... openings for leaks Initially Semi-annually Visual. 63.133(c) Inspect floating roof in accordance with §§ 63.120 (a)(2) and (a)(3) See § 63.120 (a)(2) and (a)(3) Visual. 63.133(d) Measure floating roof seal gaps... wastewater tank for control equipment failures and improper work practices Initially Semi-annually...

  19. 46 CFR 71.60-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding... boundaries of fuel tanks; or, (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances... the inspection indicated that such operations can be undertaken with safety, a certificate...

  20. 46 CFR 71.60-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding... boundaries of fuel tanks; or, (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances... the inspection indicated that such operations can be undertaken with safety, a certificate...

  1. 46 CFR 71.60-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding... boundaries of fuel tanks; or, (3) To pipe lines, heating coils, pumps, fittings, or other appurtenances... the inspection indicated that such operations can be undertaken with safety, a certificate...

  2. Iraq: U.N. Inspections for Weapons of Mass Destruction

    DTIC Science & Technology

    2003-03-28

    and Security, “Uncovering the Secret Program – Initial Inspections, talk by Demetrius Perricos, Former Deputy Leader of the IAEA Action Team. [www.isis...example, Demetrius Perricos, now director of planning and operations for UNMOVIC, performed a similar role for the IAEA in the 1990s) probably helped

  3. Detection of rare functional variants using group ISIS.

    PubMed

    Niu, Yue S; Hao, Ning; An, Lingling

    2011-11-29

    Genome-wide association studies have been firmly established in investigations of the associations between common genetic variants and complex traits or diseases. However, a large portion of complex traits and diseases cannot be explained well by common variants. Detecting rare functional variants becomes a trend and a necessity. Because rare variants have such a small minor allele frequency (e.g., <0.05), detecting functional rare variants is challenging. Group iterative sure independence screening (ISIS), a fast group selection tool, was developed to select important genes and the single-nucleotide polymorphisms within. The performance of the group ISIS and group penalization methods is compared for detecting important genes in the Genetic Analysis Workshop 17 data. The results suggest that the group ISIS is an efficient tool to discover genes and single-nucleotide polymorphisms associated to phenotypes.

  4. The signature of auroral kilometric radiation on Isis 1 ionograms

    NASA Technical Reports Server (NTRS)

    Calvert, W.

    1981-01-01

    Auroral kilometric radiation (AKR) appears on the Isis 1 topside sounder ionograms as intense noise bands between the electron cyclotron frequency and 700 kHz. A variable gap occurs between the cyclotron frequency and the lowest AKR frequency. As Isis 1 traverses the source region, the gap narrows, and the AKR signals at higher frequencies weaken. This signature suggests that the AKR waves are generated directly in the extraordinary mode at frequencies just above the local cutoff frequency and that the radiation is initially perpendicular to the magnetic field.

  5. Plasma meniscus and extraction electrode studies of the ISIS H- ion source.

    PubMed

    Lawrie, S R; Faircloth, D C; Letchford, A P; Gabor, C; Pozimski, J K

    2010-02-01

    In order to reduce the emittance and increase the transported beam current from the ISIS Penning-type H(-) ion source, improvements to the extraction system are required. This ion source is currently being commissioned on the front end test stand at the Rutherford Appleton Laboratory, which demands higher extraction energies, higher beam currents, and smaller emittances. To facilitate this, the present geometry requires optimization. This paper details the experimental and simulation studies performed of the plasma meniscus and the possible electrode geometry modifications needed to extract the highest quality beam.

  6. Plasma meniscus and extraction electrode studies of the ISIS H{sup -} ion source

    SciTech Connect

    Lawrie, S. R.; Faircloth, D. C.; Letchford, A. P.; Gabor, C.; Pozimski, J. K.

    2010-02-15

    In order to reduce the emittance and increase the transported beam current from the ISIS Penning-type H{sup -} ion source, improvements to the extraction system are required. This ion source is currently being commissioned on the front end test stand at the Rutherford Appleton Laboratory, which demands higher extraction energies, higher beam currents, and smaller emittances. To facilitate this, the present geometry requires optimization. This paper details the experimental and simulation studies performed of the plasma meniscus and the possible electrode geometry modifications needed to extract the highest quality beam.

  7. Four new polyoxygenated gorgosterols from the gorgonian Isis hippuris.

    PubMed

    Uddin, Mohammad Helal; Hanif, Novriyandi; Trianto, Agus; Agarie, Yutaka; Higa, Tatsuo; Tanaka, Junichi

    2011-03-01

    Four new polyoxygenated steroids (1-4) together with four known ones (5-8) have been isolated from the gorgonian Isis hippuris. The structures of the new compounds have been elucidated by spectroscopic analysis and chemical conversion. All of the new steroids showed moderate cytotoxicity against cultured NBT-T2 cells.

  8. The Isis Problem and the Question of Representations.

    ERIC Educational Resources Information Center

    Davis, Robert B.

    1993-01-01

    Presents two solutions of the Isis Problem, finding the dimensions of a rectangle for which the numerical values of the area and perimeter are equal, to hypothesize how the ancient Egyptians may have solved the problem without the benefits of more modern mathematics. (MDH)

  9. Understanding extraction and beam transport in the ISIS H{sup -} Penning surface plasma ion source

    SciTech Connect

    Faircloth, D. C.; Letchford, A. P.; Gabor, C.; Whitehead, M. O.; Wood, T.; Jolly, S.; Pozimski, J.; Savage, P.; Woods, M.

    2008-02-15

    The ISIS H{sup -} Penning surface plasma source has been developed to produce beam currents up to 70 mA and pulse lengths up to 1.5 ms at 50 Hz. This paper details the investigation into beam extraction and beam transport in an attempt to understand the beam emittance and to try to improve the emittance. A scintillator profile measurement technique has been developed to assess the performance of different plasma electrode apertures, extraction electrode geometries, and postextraction acceleration configurations. This work shows that the present extraction, beam transport, and postacceleration system are suboptimal and further work is required to improve it.

  10. New online ecology of adversarial aggregates: ISIS and beyond.

    PubMed

    Johnson, N F; Zheng, M; Vorobyeva, Y; Gabriel, A; Qi, H; Velasquez, N; Manrique, P; Johnson, D; Restrepo, E; Song, C; Wuchty, S

    2016-06-17

    Support for an extremist entity such as Islamic State (ISIS) somehow manages to survive globally online despite considerable external pressure and may ultimately inspire acts by individuals having no history of extremism, membership in a terrorist faction, or direct links to leadership. Examining longitudinal records of online activity, we uncovered an ecology evolving on a daily time scale that drives online support, and we provide a mathematical theory that describes it. The ecology features self-organized aggregates (ad hoc groups formed via linkage to a Facebook page or analog) that proliferate preceding the onset of recent real-world campaigns and adopt novel adaptive mechanisms to enhance their survival. One of the predictions is that development of large, potentially potent pro-ISIS aggregates can be thwarted by targeting smaller ones.

  11. Isis 1 observations at the source of auroral kilometric radiation

    NASA Technical Reports Server (NTRS)

    Benson, R. F.; Calvert, W.

    1979-01-01

    Observations of auroral kilometric radiation (AKR) were made by Isis 1 in the source region. The radiation is found to be generated in the extraordinary mode just above the local cut-off frequency and to emanate nearly perpendicular to the magnetic field. It occurs within local depletions of electron density, where the ratio of plasma frequency to cyclotron frequency is less than 0.2. The density depletion is restricted to altitudes above about 2000 km, and the upper AKR frequency limit corresponds to the extraordinary cut-off frequency at this altitude. AKR is observed from Isis 1 above the nighttime auroral zone over a wider extent in longitude than in latitude with an intense source region observed most often near 2200 LMT and 70 deg invariant latitude. It is directly related to inverted V electron precipitation events with an electron-to-wave energy conversion efficiency of the order of 0.1 to 1%.

  12. 9 CFR 500.7 - Refusal to grant inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT RULES... Federal inspection because an applicant: (1) Does not have a HACCP plan as required by part 417 of...

  13. Whistler-triggered emissions observed by ISIS satellites

    NASA Technical Reports Server (NTRS)

    Nakamura, Y.; Ondoh, T.

    1989-01-01

    A statistical examination has been conducted of the ducted and nonducted whistler-triggered emissions (WTEs) observed by the ISIS satellites in the 1979-1981 period. Most WTEs are observed with simultaneous lower hybrid resonance in the topside ionosphere. The VLF emissions triggered by ducted whistlers frequently occur at L of 2-3, while those triggered by nonducted whistlers occur in the wider latitudinal regions at L of 2.2-4.3.

  14. Particle Identification in the NIMROD-ISiS Detector Array

    SciTech Connect

    Wuenschel, S.; Hagel, K.; May, L. W.; Wada, R.; Yennello, S. J.

    2009-03-10

    Interest in the influence of the neutron-to-proton (N/Z) ratio on multifragmenting nuclei has demanded an improvement in the capabilities of multi-detector arrays as well as the companion analysis methods. The particle identification method used in the NIMROD-ISiS 4{pi} array is described. Performance of the detectors and the analysis method are presented for the reaction of {sup 86}Kr+{sup 64}Ni at 35 MeV/u.

  15. The ISIS Penning H- SPS and Diagnostic Developments at RAL

    SciTech Connect

    Faircloth, D. C.; Letchford, A. P.; Whitehead, M. O.; Wood, T.; Pozimski, J.; Jolly, S.; Savage, P.; Haigh, M.; Morrison, J.; Yew, I.; Doucas, G.

    2007-08-10

    This paper covers the recent work carried out at the Rutherford Appleton Laboratory (RAL) on the ISIS Ion Source Development Rig (ISDR). The development of a retarding potential energy analyzer is described and a measured energy spread of 17.6 eV {+-} 1.5 eV from the ion source is reported. Variation in energy spread versus discharge current is shown. The development of a pepperpot emittance scanner to study emittance variation along the beam axis is discussed.

  16. Laboratory accreditation and inspection.

    PubMed

    Rauch, Carol A; Nichols, James H

    2007-12-01

    Clinical laboratories perform diagnostic testing in a highly regulated environment in which federal, state, and private accreditation agencies monitor the quality of testing processes. These agencies vary in the focus and stringency of their requirements, and differences exist among states. Continued accreditation requires regular inspection to assure quality of test results for physicians, insurers, and, ultimately, the patients being tested. Preparation for inspection requires understanding of the unique accreditation requirements for each institution, establishment of quality assurance and quality improvement oversight, and communication of each staff member's role in delivering quality test results for patient care.

  17. Cohort Profile: The Interdisciplinary Study of Inequalities in Smoking (ISIS).

    PubMed

    Frohlich, Katherine L; Shareck, Martine; Vallée, Julie; Abel, Thomas; Agouri, Rowena; Cantinotti, Michael; Daniel, Mark; Dassa, Clément; Datta, Geetanjali; Gagné, Thierry; Leclerc, Bernard-Simon; Kestens, Yan; O'Loughlin, Jennifer; Potvin, Louise

    2015-05-06

    The Interdisciplinary Study of Inequalities in Smoking (ISIS) is a cohort study investigating the joint effects of residents' socio-demographic characteristics and neighbourhood attributes on the social distribution of smoking in a young adult population. Smoking is a behaviour with an increasingly steep social class gradient; smoking prevalence among young adults is no longer declining at the same rate as among the rest of the population, and there is evidence of growing place-based disparities in smoking. ISIS was established to examine these pressing concerns. The ISIS sample comprises non-institutionalized individuals aged 18-25 years, who are proficient in English and/or French and who had been living at their current address in Montréal, Canada, for at least 1 year at time of first contact. Two waves of data have been collected: baseline data were collected November 2011-September 2012 (n = 2093), and a second wave of data was collected January-June 2014 (n = 1457). Data were collected from respondents using a self-administered questionnaire, developed by the research team based on sociological theory, which includes questions concerning social, economic, cultural and biological capital, and activity space as well as smoking behaviour. Data are available upon request from [katherine.frohlich@umontreal.ca].

  18. 46 CFR 169.226 - Periodic inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... periodic inspection within 3 months before or after the second or third anniversary of the date of your vessel's Certificate of Inspection. This periodic inspection will take the place of an annual inspection... a time and place which he or she approves. No written application is required. (c) The scope of...

  19. Evaluation of computer-based ultrasonic inservice inspection systems

    SciTech Connect

    Harris, R.V. Jr.; Angel, L.J.; Doctor, S.R.; Park, W.R.; Schuster, G.J.; Taylor, T.T.

    1994-03-01

    This report presents the principles, practices, terminology, and technology of computer-based ultrasonic testing for inservice inspection (UT/ISI) of nuclear power plants, with extensive use of drawings, diagrams, and LTT images. The presentation is technical but assumes limited specific knowledge of ultrasonics or computers. The report is divided into 9 sections covering conventional LTT, computer-based LTT, and evaluation methodology. Conventional LTT topics include coordinate axes, scanning, instrument operation, RF and video signals, and A-, B-, and C-scans. Computer-based topics include sampling, digitization, signal analysis, image presentation, SAFI, ultrasonic holography, transducer arrays, and data interpretation. An evaluation methodology for computer-based LTT/ISI systems is presented, including questions, detailed procedures, and test block designs. Brief evaluations of several computer-based LTT/ISI systems are given; supplementary volumes will provide detailed evaluations of selected systems.

  20. Masithethe: speech and language development and difficulties in isiXhosa.

    PubMed

    Pascoe, Michelle; Smouse, Mantoa

    2012-03-02

    IsiXhosa is the second most spoken language in South Africa and one of its official languages. Spoken mainly in the Eastern and Western Cape regions it is fitting that much of the research focusing on children's isiXhosa speech and language acquisition has been carried out at the University of Cape Town (UCT). We describe what is known about children's acquisition of isiXhosa, and highlight studies which inform our knowledge of the typical development of the language in relation to the acquisition of consonants including clicks and the isiXhosa noun class system. Little is known about the specific nature of speech and language difficulties in isiXhosa, and the development of isiXhosa resources for speech and language assessment and therapy is in its infancy. Suggestions are made for advancing knowledge and practice which is needed to provide a relevant and quality service to isiXhosa speakers.

  1. In service inspection and repair of sodium cooled ASTRID prototype

    SciTech Connect

    Baque, F.; Jadot, F.; Marlier, R.; Saillant, J-F.

    2015-07-01

    In the frame of the large R and D work which is performed for the future ASTRID sodium cooled prototype, In Service Inspection and Repair (ISI and R) has been identified as a major issue to be taken into account in order to enlarge the plant safety, to consolidate its availability and to protect the associated investment. After the first part of pre-conceptual design phase (2008-2012), the running second part of pre-conceptual phase (2013-2015) allows to increase the ISI and R tool ability for immersed sodium structures of ASTRID, at about 200 deg. C, on the basis of consolidated specifications and thanks to their qualification through more and more realistic laboratory tests and simulation with CIVA code. ISI and R items are being developed and qualified during a pluri-annual program which mainly deals with the reactor block structures, the primary components and circuit, and the Power Conversion System. It ensures a strong connection between the reactor designers and inspection specialists, as the optimization of inspectability and repairability is looked at: this already induced specific rules for design, in order to shorten and ease the ISI and R operations, which have been merged into RCC-MRx rules. In the frame of increasing technology readiness level with corresponding performance demonstration, this paper presents R and D dealing with the ISI and R items: it highlights the sensor development (both ultrasonic and electromagnetic concepts, compatible with sodium at 200 deg. C), then their applications for ASTRID structure control (under sodium telemetry, imaging and NDE). Activity for repair is also presented (a single laser tool for sodium sweeping, machining and welding), and finally the effort for associated robotic (generic program for ASTRID applications, specific technological tools for sodium medium, tight immersed bell). The main results of testing and simulation are given for telemetry, vision, NDE applications, laser process repair and under sodium

  2. Improving the Automatic Inversion of Digital Alouette/ISIS Ionogram Reflection Traces into Topside Electron Density Profiles

    NASA Technical Reports Server (NTRS)

    Benson, Robert F.; Truhlik, Vladimir; Huang, Xueqin; Wang, Yongli; Bilitza, Dieter

    2012-01-01

    The topside sounders of the International Satellites for Ionospheric Studies (ISIS) program were designed as analog systems. The resulting ionograms were displayed on 35 mm film for analysis by visual inspection. Each of these satellites, launched between 1962 and 1971, produced data for 10 to 20 years. A number of the original telemetry tapes from this large data set have been converted directly into digital records. Software, known as the Topside Ionogram Scalar With True-Height (TOPIST) algorithm, has been produced and used for the automatic inversion of the ionogram reflection traces on more than 100,000 ISIS-2 digital topside ionograms into topside vertical electron density profiles Ne(h). Here we present some topside ionospheric solar cycle variations deduced from the TOPIST database to illustrate the scientific benefit of improving and expanding the topside ionospheric Ne(h) database. The profile improvements will be based on improvements in the TOPIST software motivated by direct comparisons between TOPIST profiles and profiles produced by manual scaling in the early days of the ISIS program. The database expansion will be based on new software designed to overcome limitations in the original digital topside ionogram database caused by difficulties encountered during the analog-to-digital conversion process in the detection of the ionogram frame sync pulse and/or the frequency markers. This improved and expanded TOPIST topside Ne(h) database will greatly enhance investigations into both short- and long-term ionospheric changes, e.g., the observed topside ionospheric responses to magnetic storms, induced by interplanetary magnetic clouds, and solar cycle variations, respectively.

  3. Java Image I/O for VICAR, PDS, and ISIS

    NASA Technical Reports Server (NTRS)

    Deen, Robert G.; Levoe, Steven R.

    2011-01-01

    This library, written in Java, supports input and output of images and metadata (labels) in the VICAR, PDS image, and ISIS-2 and ISIS-3 file formats. Three levels of access exist. The first level comprises the low-level, direct access to the file. This allows an application to read and write specific image tiles, lines, or pixels and to manipulate the label data directly. This layer is analogous to the C-language "VICAR Run-Time Library" (RTL), which is the image I/O library for the (C/C++/Fortran) VICAR image processing system from JPL MIPL (Multimission Image Processing Lab). This low-level library can also be used to read and write labeled, uncompressed images stored in formats similar to VICAR, such as ISIS-2 and -3, and a subset of PDS (image format). The second level of access involves two codecs based on Java Advanced Imaging (JAI) to provide access to VICAR and PDS images in a file-format-independent manner. JAI is supplied by Sun Microsystems as an extension to desktop Java, and has a number of codecs for formats such as GIF, TIFF, JPEG, etc. Although Sun has deprecated the codec mechanism (replaced by IIO), it is still used in many places. The VICAR and PDS codecs allow any program written using the JAI codec spec to use VICAR or PDS images automatically, with no specific knowledge of the VICAR or PDS formats. Support for metadata (labels) is included, but is format-dependent. The PDS codec, when processing PDS images with an embedded VIAR label ("dual-labeled images," such as used for MER), presents the VICAR label in a new way that is compatible with the VICAR codec. The third level of access involves VICAR, PDS, and ISIS Image I/O plugins. The Java core includes an "Image I/O" (IIO) package that is similar in concept to the JAI codec, but is newer and more capable. Applications written to the IIO specification can use any image format for which a plug-in exists, with no specific knowledge of the format itself.

  4. Information System Constraint Language (ISyCL) Technical Report

    DTIC Science & Technology

    1992-09-01

    Mayer 871, and IDEFIx [DACOM 85], since there is no need to repeat here the information in those excellent texts. ISyCL Technical Report 5 Final...structures used to dc.sciihc ,owntraints on an IDEF3 process description would he different than tthose used to add con-sLraints to an IDEFIx data model...probably using tags and other user-supplied aids. For example, an IDEFI entity class might map to an IDEFIx entity, but the modeler would have to

  5. Information-Driven Inspections

    SciTech Connect

    Laughter, Mark D; Whitaker, J Michael; Lockwood, Dunbar

    2010-01-01

    New uranium enrichment capacity is being built worldwide in response to perceived shortfalls in future supply. To meet increasing safeguards responsibilities with limited resources, the nonproliferation community is exploring next-generation concepts to increase the effectiveness and efficiency of safeguards, such as advanced technologies to enable unattended monitoring of nuclear material. These include attribute measurement technologies, data authentication tools, and transmission and security methods. However, there are several conceptual issues with how such data would be used to improve the ability of a safeguards inspectorate such as the International Atomic Energy Agency (IAEA) to reach better safeguards conclusions regarding the activities of a State. The IAEA is pursuing the implementation of information-driven safeguards, whereby all available sources of information are used to make the application of safeguards more effective and efficient. Data from continuous, unattended monitoring systems can be used to optimize on-site inspection scheduling and activities at declared facilities, resulting in fewer, better inspections. Such information-driven inspections are the logical evolution of inspection planning - making use of all available information to enhance scheduled and randomized inspections. Data collection and analysis approaches for unattended monitoring systems can be designed to protect sensitive information while enabling information-driven inspections. A number of such inspections within a predetermined range could reduce inspection frequency while providing an equal or greater level of deterrence against illicit activity, all while meeting operator and technology holder requirements and reducing inspector and operator burden. Three options for using unattended monitoring data to determine an information-driven inspection schedule are to (1) send all unattended monitoring data off-site, which will require advances in data analysis techniques to

  6. 40 CFR 63.7927 - What are my inspection and monitoring requirements for closed vent systems and control devices?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... required by § 63.693(c)(2)(ii). (b) If you use a regenerable carbon adsorption system, you must meet the... adsorption cycle. (2) Use a CPMS to measure and record the hourly average temperature of the adsorption bed... average temperature of the adsorption bed after regeneration (and within 15 minutes after completing...

  7. 40 CFR 63.7927 - What are my inspection and monitoring requirements for closed vent systems and control devices?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... required by § 63.693(c)(2)(ii). (b) If you use a regenerable carbon adsorption system, you must meet the... adsorption cycle. (2) Use a CPMS to measure and record the hourly average temperature of the adsorption bed... average temperature of the adsorption bed after regeneration (and within 15 minutes after completing...

  8. 40 CFR 63.7927 - What are my inspection and monitoring requirements for closed vent systems and control devices?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... required by § 63.693(c)(2)(ii). (b) If you use a regenerable carbon adsorption system, you must meet the... adsorption cycle. (2) Use a CPMS to measure and record the hourly average temperature of the adsorption bed... average temperature of the adsorption bed after regeneration (and within 15 minutes after completing...

  9. 46 CFR 91.50-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 91... testing required when making alterations, repairs, or other such operations involving riveting, welding..., welding, burning, or like fire-producing actions shall be made: (1) Within or on the boundaries of...

  10. 46 CFR 71.60-1 - Inspection and testing required when making alterations, repairs, or other such operations...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting,...

  11. The ISI distribution of the stochastic Hodgkin-Huxley neuron.

    PubMed

    Rowat, Peter F; Greenwood, Priscilla E

    2014-01-01

    The simulation of ion-channel noise has an important role in computational neuroscience. In recent years several approximate methods of carrying out this simulation have been published, based on stochastic differential equations, and all giving slightly different results. The obvious, and essential, question is: which method is the most accurate and which is most computationally efficient? Here we make a contribution to the answer. We compare interspike interval histograms from simulated data using four different approximate stochastic differential equation (SDE) models of the stochastic Hodgkin-Huxley neuron, as well as the exact Markov chain model simulated by the Gillespie algorithm. One of the recent SDE models is the same as the Kurtz approximation first published in 1978. All the models considered give similar ISI histograms over a wide range of deterministic and stochastic input. Three features of these histograms are an initial peak, followed by one or more bumps, and then an exponential tail. We explore how these features depend on deterministic input and on level of channel noise, and explain the results using the stochastic dynamics of the model. We conclude with a rough ranking of the four SDE models with respect to the similarity of their ISI histograms to the histogram of the exact Markov chain model.

  12. The MICE Muon Beam on ISIS and the beam-line instrumentation of the Muon Ionization Cooling Experiment

    SciTech Connect

    Bogomilov, M.; et al.

    2012-05-01

    The international Muon Ionization Cooling Experiment (MICE), which is under construction at the Rutherford Appleton Laboratory (RAL), will demonstrate the principle of ionization cooling as a technique for the reduction of the phase-space volume occupied by a muon beam. Ionization cooling channels are required for the Neutrino Factory and the Muon Collider. MICE will evaluate in detail the performance of a single lattice cell of the Feasibility Study 2 cooling channel. The MICE Muon Beam has been constructed at the ISIS synchrotron at RAL, and in MICE Step I, it has been characterized using the MICE beam-instrumentation system. In this paper, the MICE Muon Beam and beam-line instrumentation are described. The muon rate is presented as a function of the beam loss generated by the MICE target dipping into the ISIS proton beam. For a 1 V signal from the ISIS beam-loss monitors downstream of our target we obtain a 30 KHz instantaneous muon rate, with a neglible pion contamination in the beam.

  13. Environmental influences on the Indo-Pacific octocoral Isis hippuris Linnaeus 1758 (Alcyonacea: Isididae): genetic fixation or phenotypic plasticity?

    PubMed

    Rowley, Sonia J; Pochon, Xavier; Watling, Les

    2015-01-01

    As conspicuous modular components of benthic marine habitats, gorgonian (sea fan) octocorals have perplexed taxonomists for centuries through their shear diversity, particularly throughout the Indo-Pacific. Phenotypic incongruence within and between seemingly unitary lineages across contrasting environments can provide the raw material to investigate processes of disruptive selection. Two distinct phenotypes of the Isidid Isis hippurisLinnaeus, 1758 partition between differing reef environments: long-branched bushy colonies on degraded reefs, and short-branched multi/planar colonies on healthy reefs within the Wakatobi Marine National Park (WMNP), Indonesia. Multivariate analyses reveal phenotypic traits between morphotypes were likely integrated primarily at the colony level with increased polyp density and consistently smaller sclerite dimensions at the degraded site. Sediment load and turbidity, hence light availability, primarily influenced phenotypic differences between the two sites. This distinct morphological dissimilarity between the two sites is a reliable indicator of reef health; selection primarily acting on colony morphology, porosity through branching structure, as well as sclerite diversity and size. ITS2 sequence and predicted RNA secondary structure further revealed intraspecific variation between I. hippuris morphotypes relative to such environments (ΦST = 0.7683, P < 0.001). This evidence suggests-but does not confirm-that I. hippuris morphotypes within the WMNP are two separate species; however, to what extent and taxonomic assignment requires further investigation across its full geographic distribution. Incongruence between colonies present in the WMNP with tenuously described Isis alternatives (Isis reticulataNutting, 1910, Isis minorbrachyblastaZou, Huang & Wang, 1991), questions the validity of such assignments. Furthermore, phylogenetic analyses confirm early taxonomic suggestion that the characteristic jointed axis of the Isididae is in

  14. Environmental influences on the Indo–Pacific octocoral Isis hippuris Linnaeus 1758 (Alcyonacea: Isididae): genetic fixation or phenotypic plasticity?

    PubMed Central

    Pochon, Xavier; Watling, Les

    2015-01-01

    As conspicuous modular components of benthic marine habitats, gorgonian (sea fan) octocorals have perplexed taxonomists for centuries through their shear diversity, particularly throughout the Indo–Pacific. Phenotypic incongruence within and between seemingly unitary lineages across contrasting environments can provide the raw material to investigate processes of disruptive selection. Two distinct phenotypes of the Isidid Isis hippuris Linnaeus, 1758 partition between differing reef environments: long-branched bushy colonies on degraded reefs, and short-branched multi/planar colonies on healthy reefs within the Wakatobi Marine National Park (WMNP), Indonesia. Multivariate analyses reveal phenotypic traits between morphotypes were likely integrated primarily at the colony level with increased polyp density and consistently smaller sclerite dimensions at the degraded site. Sediment load and turbidity, hence light availability, primarily influenced phenotypic differences between the two sites. This distinct morphological dissimilarity between the two sites is a reliable indicator of reef health; selection primarily acting on colony morphology, porosity through branching structure, as well as sclerite diversity and size. ITS2 sequence and predicted RNA secondary structure further revealed intraspecific variation between I. hippuris morphotypes relative to such environments (ΦST = 0.7683, P < 0.001). This evidence suggests—but does not confirm—that I. hippuris morphotypes within the WMNP are two separate species; however, to what extent and taxonomic assignment requires further investigation across its full geographic distribution. Incongruence between colonies present in the WMNP with tenuously described Isis alternatives (Isis reticulata Nutting, 1910, Isis minorbrachyblasta Zou, Huang & Wang, 1991), questions the validity of such assignments. Furthermore, phylogenetic analyses confirm early taxonomic suggestion that the characteristic jointed axis of the

  15. Process Approach to Determining Quality Inspection Deployment

    DTIC Science & Technology

    2015-06-08

    processes will be affected. Often because product quality has increased or automated inspection equipment has been introduced, the inspection activity may...Q 9858 Quality Program Requirements [1] and MIL I 45208 Inspection System Requirements [2]. During the intervening years product quality and...appropriate given that product quality has increased or automated inspection equipment has been introduced. The study presents a spreadsheet with an

  16. Analysis and Ground Testing for Validation of the Inflatable Sunshield in Space (ISIS) Experiment

    NASA Technical Reports Server (NTRS)

    Lienard, Sebastien; Johnston, John; Adams, Mike; Stanley, Diane; Alfano, Jean-Pierre; Romanacci, Paolo

    2000-01-01

    The Next Generation Space Telescope (NGST) design requires a large sunshield to protect the large aperture mirror and instrument module from constant solar exposure at its L2 orbit. The structural dynamics of the sunshield must be modeled in order to predict disturbances to the observatory attitude control system and gauge effects on the line of site jitter. Models of large, non-linear membrane systems are not well understood and have not been successfully demonstrated. To answer questions about sunshield dynamic behavior and demonstrate controlled deployment, the NGST project is flying a Pathfinder experiment, the Inflatable Sunshield in Space (ISIS). This paper discusses in detail the modeling and ground-testing efforts performed at the Goddard Space Flight Center to: validate analytical tools for characterizing the dynamic behavior of the deployed sunshield, qualify the experiment for the Space Shuttle, and verify the functionality of the system. Included in the discussion will be test parameters, test setups, problems encountered, and test results.

  17. The ICAM-1 antisense oligonucleotide ISIS-3082 prevents the development of postoperative ileus in mice.

    PubMed

    The, Frans O; de Jonge, Wouter J; Bennink, Roel J; van den Wijngaard, Rene M; Boeckxstaens, Guy E

    2005-09-01

    Intestinal manipulation (IM) during abdominal surgery triggers the influx of inflammatory cells, leading to postoperative ileus. Prevention of this local muscle inflammation, using intercellular adhesion molecule-1 (ICAM-1) and leukocyte function-associated antigen-1-specific antibodies, has been shown to shorten postoperative ileus. However, the therapeutic use of antibodies has considerable disadvantages. The aim of the current study was to evaluate the effect of ISIS-3082, a mouse-specific ICAM-1 antisense oligonucleotide, on postoperative ileus in mice. Mice underwent a laparotomy or a laparotomy combined with IM after treatment with ICAM-1 antibodies, 0.1-10 mg kg(-1) ISIS-3082, saline or ISIS-8997 (scrambled control antisense oligonucleotides, 1 and 3 mg kg(-1)). At 24 h after surgery, gastric emptying of a 99mTC labelled semi-liquid meal was determined using scintigraphy. Intestinal inflammation was assessed by myeloperoxidase (MPO) activity in ileal muscle whole mounts. IM significantly reduced gastric emptying compared to laparotomy. Pretreatment with ISIS-3082 (0.1-1 mg kg(-1)) as well as ICAM-1 antibodies (10 mg kg(-1)), but not ISIS-8997 or saline, improved gastric emptying in a dose-dependent manner. This effect diminished with higher doses of ISIS-3082 (3-10 mg kg(-1)). Similarly, ISIS-3082 (0.1-1 mg kg(-1)) and ICAM-1 antibodies, but not ISIS-8997 or higher doses of ISIS-3082 (3-10 mg kg(-1)), reduced manipulation-induced inflammation. Immunohistochemistry showed reduction of ICAM-1 expression with ISIS-3082 only. ISIS-3082 pretreatment prevents postoperative ileus in mice by reduction of manipulation-induced local intestinal muscle inflammation. Our data suggest that targeting ICAM-1 using antisense oligonucleotides may represent a new therapeutic approach to the prevention of postoperative ileus.

  18. Pre-Demolition Inspections

    EPA Pesticide Factsheets

    A pre-demolition inspection may be one of the most helpful and cost-efficient steps you can take to identify materials that should (or must) be removed from buildings prior to demolition. In some cases it may be required by regulation.

  19. The Isy1p component of the NineTeen complex interacts with the ATPase Prp16p to regulate the fidelity of pre-mRNA splicing.

    PubMed

    Villa, Tommaso; Guthrie, Christine

    2005-08-15

    Prp16p is a DEAH-box ATPase that transiently associates with the spliceosome to promote the structural transition required for the second chemical step. Yeast strains carrying the cold-sensitive allele prp16-302 stall the release of Prp16p at low temperatures, yet splice precursors with aberrant branchpoints at increased frequency. To identify new factors involved in the regulation of splicing fidelity, we sought suppressors of the prp16-302 growth phenotype. Deletion of the nonessential ISY1 gene (1) improves growth of prp16-302 strains, (2) alleviates stalling, and (3) restores fidelity of branchpoint usage to wild-type levels. Isy1p is a subunit of the NineTeen Complex containing Prp19p, an essential E3 ubiquitin ligase homolog required for splicing. Notably, Deltaisy1 PRP16 strains display reduced fidelity of 3'-splice site selection. Consistent with a recent two-state model of the spliceosome, our genetic and biochemical results suggest that Isy1p acts together with U6 snRNA to promote a spliceosomal conformation favorable for first-step chemistry. We propose that deletion of ISY1 favors the premature release of Prp16p, thus promoting second-step chemistry of precursors with inappropriate 3'-splice sites.

  20. Development of high pressure gas cells at ISIS

    NASA Astrophysics Data System (ADS)

    Kirichek, O.; Done, R.; Goodway, C. M.; Kibble, M. G.; Evans, B.; Bowden, Z. A.

    2012-02-01

    High-pressure research is one of the fastest-growing areas of natural science, and one that attracts as diverse communities as those of physics, bio-physics, chemistry, materials science and earth science. In condensed matter physics there are a number of highly topical areas, such as quantum criticality, pressure-induced superconductivity or non-Fermi liquid behaviour, where pressure is a fundamental parameter. Reliable, safe and user-friendly high pressure gas handling systems with gas pressures up to 1GPa should make a significant impact on the range of science possible. The ISIS facility is participating in the NMI3 FP7 sample environment project supported by the European Commission which includes high pressure gas cell development. In this paper the progress in designing, manufacturing and testing a new generation of high pressure gas cells for neutron scattering experiments is discussed.

  1. Auroral kilometric radiation source region observations from ISIS 1

    NASA Technical Reports Server (NTRS)

    Benson, R. F.

    1981-01-01

    The ISIS 1 observations of the high-frequency portion of the auroral kilometric radiation (AKR) spectrum are considered, that is, from the minimum frequency encountered for the extraordinary mode cut-off (approximately 450 kHz) to the upper frequency cut-off (approximately 800 kHz). AKR is found to be generated in the extraordinary mode just above the local cutoff frequency and to emanate in a direction that is nearly perpendicular to the magnetic field. It occurs within local depletions of electron density, where the ratio of plasma frequency to cyclotron frequency is below 0.2. The density depletion is restricted to altitudes above approximately 2,000 km, and the upper AKR frequency limit corresponds to the extraordinary cutoff frequency at this altitude.

  2. Polar cap auroral electron fluxes observed with Isis 1

    NASA Technical Reports Server (NTRS)

    Winningham, J. D.; Heikkila, W. J.

    1974-01-01

    Three types of auroral particle precipitation have been observed over the polar caps, well inside the auroral oval, by means of the soft particle spectrometer on the Isis 1 satellite. The first type is a uniform, very soft (about 100 eV) electron 'polar rain' over the entire polar cap; this may well be present with very weak intensity at all times, but it is markedly enhanced during worldwide geomagnetic storms. A second type of precipitation is a structured flux of electrons with energies near 1 keV, suggestive of localized 'polar showers'; it seems likely that these are the cause of the sun-aligned auroral arcs that have been observed during moderately quiet conditions. During periods of intense magnetic disturbance this precipitation can become very intense and exhibit a characteristic pattern that we have come to call a 'polar squall'.

  3. Polyhydroxylated steroids from the bamboo coral Isis hippuris.

    PubMed

    Chen, Wei-Hua; Wang, Shang-Kwei; Duh, Chang-Yih

    2011-01-01

    In previous studies on the secondary metabolites of the Taiwanese octocoral Isis hippuris, specimens have always been collected at Green Island. In the course of our studies on bioactive compounds from marine organisms, the acetone-solubles of the Taiwanese octocoral I. hippuris collected at Orchid Island have led to the isolation of five new polyoxygenated steroids: hipposterone M-O (1-3), hipposterol G (4) and hippuristeroketal A (5). The structures of these compounds were determined on the basis of their spectroscopic and physical data. The anti-HCMV (human cytomegalovirus) activity of 1-5 and their cytotoxicity against selected cell lines were evaluated. Compound 2 exhibited inhibitory activity against HCMV, with an EC(50) value of 6.0 μg/mL.

  4. OSHA Inspections

    DTIC Science & Technology

    2000-01-01

    Under the Occupational Safety and Health Act of 1970 (the Act), the Occupational Safety and Health Administration (OSHA) is authorized to conduct... occupational safety and health field and who are trained in OSHA standards and in the recognition of safety and health hazards. Similarly, states with...their own occupational safety and health programs conduct inspection using qualified state compliance safety and health officers.

  5. Programming your way out of the past: ISIS and the META Project

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth P.; Marzullo, Keith

    1989-01-01

    The ISIS distributed programming system and the META Project are described. The ISIS programming toolkit is an aid to low-level programming that makes it easy to build fault-tolerant distributed applications that exploit replication and concurrent execution. The META Project is reexamining high-level mechanisms such as the filesystem, shell language, and administration tools in distributed systems.

  6. Drug evaluation: ISIS-301012, an antisense oligonucleotide for the treatment of hypercholesterolemia.

    PubMed

    Burnett, John R

    2006-10-01

    ISIS-301012 is an antisense oligonucleotide inhibitor of apolipoprotein B-100, which is being developed by Isis Pharmaceuticals Inc for the potential treatment of hypercholesterolemia. A subcutaneous injectable formulation is currently undergoing phase 11 clinical trials, while phase I trials are underway with an oral formulation of the drug.

  7. The ISIS Project: Real Experience with a Fault Tolerant Programming System

    NASA Technical Reports Server (NTRS)

    Birman, Kenneth; Cooper, Robert

    1990-01-01

    The ISIS project has developed a distributed programming toolkit and a collection of higher level applications based on these tools. ISIS is now in use at more than 300 locations world-wise. The lessons (and surprises) gained from this experience with the real world are discussed.

  8. Advances in inspection automation

    NASA Astrophysics Data System (ADS)

    Weber, Walter H.; Mair, H. Douglas; Jansen, Dion; Lombardi, Luciano

    2013-01-01

    This new session at QNDE reflects the growing interest in inspection automation. Our paper describes a newly developed platform that makes the complex NDE automation possible without the need for software programmers. Inspection tasks that are tedious, error-prone or impossible for humans to perform can now be automated using a form of drag and drop visual scripting. Our work attempts to rectify the problem that NDE is not keeping pace with the rest of factory automation. Outside of NDE, robots routinely and autonomously machine parts, assemble components, weld structures and report progress to corporate databases. By contrast, components arriving in the NDT department typically require manual part handling, calibrations and analysis. The automation examples in this paper cover the development of robotic thickness gauging and the use of adaptive contour following on the NRU reactor inspection at Chalk River.

  9. Piping inspection round robin

    SciTech Connect

    Heasler, P.G.; Doctor, S.R.

    1996-04-01

    The piping inspection round robin was conducted in 1981 at the Pacific Northwest National Laboratory (PNNL) to quantify the capability of ultrasonics for inservice inspection and to address some aspects of reliability for this type of nondestructive evaluation (NDE). The round robin measured the crack detection capabilities of seven field inspection teams who employed procedures that met or exceeded the 1977 edition through the 1978 addenda of the American Society of Mechanical Engineers (ASME) Section 11 Code requirements. Three different types of materials were employed in the study (cast stainless steel, clad ferritic, and wrought stainless steel), and two different types of flaws were implanted into the specimens (intergranular stress corrosion cracks (IGSCCs) and thermal fatigue cracks (TFCs)). When considering near-side inspection, far-side inspection, and false call rate, the overall performance was found to be best in clad ferritic, less effective in wrought stainless steel and the worst in cast stainless steel. Depth sizing performance showed little correlation with the true crack depths.

  10. Structure and functional role of supercomplexes of IsiA and Photosystem I in cyanobacterial photosynthesis.

    PubMed

    Kouril, Roman; Arteni, Ana A; Lax, Julia; Yeremenko, Nataliya; D'Haene, Sandrine; Rögner, Matthias; Matthijs, Hans C P; Dekker, Jan P; Boekema, Egbert J

    2005-06-13

    Cyanobacteria express large quantities of the iron stress-inducible protein IsiA under iron deficiency. IsiA can assemble into numerous types of single or double rings surrounding Photosystem I. These supercomplexes are functional in light-harvesting, empty IsiA rings are effective energy dissipaters. Electron microscopy studies of these supercomplexes show that Photosystem I trimers bind 18 IsiA copies in a single ring, whereas monomers may bind up to 35 copies in two rings. Work on mutants indicates that the PsaF/J and PsaL subunits facilitate the formation of closed rings around Photosystem I monomers but are not obligatory components in the formation of Photosystem I-IsiA supercomplexes.

  11. The interactive on-site inspection system: An information management system to support arms control inspections

    SciTech Connect

    DeLand, S.M.; Widney, T.W.; Horak, K.E.; Caudell, R.B.; Grose, E.M.

    1996-12-01

    The increasing use of on-site inspection (OSI) to meet the nation`s obligations with recently signed treaties requires the nation to manage a variety of inspection requirements. This document describes a prototype automated system to assist in the preparation and management of these inspections.

  12. Underwater welding, cutting and inspection

    SciTech Connect

    Tsai, C.L. . Ohio Underwater Welding Center)

    1995-02-01

    Underwater welding, cutting and inspection of offshore, inland waterway and port facilities are becoming a requirement for both military and industrial communities, as maintenance and repair costs continue to escalate, and as many of the facilities are in operation well beyond their intended design life. In nuclear applications, underwater welding, cutting and inspection for repair and modification of irradiated nuclear power plant components are also a requirement. This article summarizes recent developments in this emerging underwater technology.

  13. Thermographic inspection of massive structures

    SciTech Connect

    Renshaw, Jeremy B.; Guimaraes, Maria; Scott, David B.

    2014-02-18

    Nondestructive Evaluation of concrete structures is a growing concern for the nuclear industry as well as for many other industries. As critical concrete components continue to age, the ability to assess the health and suitability for continued service has become a key consideration. In some cases, repair of these structures is difficult and expensive, while replacement is prohibitively expensive or, in some cases, not feasible. Therefore, the ability to inspect these key assets is a primary concern, especially in the nuclear industry. Due to the large size of containment buildings, cooling towers, and other large concrete assets, the ability to rapidly inspect for defects of concern is very desirable. Thermographic inspection appears to have the required ability to rapidly inspect large structures to ascertain the location and size of many of the defects of concern. This ability was demonstrated by performing a thermographic inspection of a large concrete dam in 2 days.

  14. Molecular characterization and genomic distribution of Isis: a new retrotransposon of Drosophila buzzatii.

    PubMed

    García Guerreiro, M P; Fontdevila, A

    2007-01-01

    A new transposable element, Isis, is identified as a LTR retrotransposon in Drosophila buzzatii. DNA sequence analysis shows that Isis contains three long ORFs similar to gag, pol and env genes of retroviruses. The ORF1 exhibits sequence homology to matrix, capsid and nucleocapsid gag proteins and ORF2 encodes a putative protease (PR), a reverse transcriptase (RT), an Rnase H (RH) and an integrase (IN) region. The analysis of a putative env product, encoded by the env ORF3, shows a degenerated protein containing several stop codons. The molecular study of the putative proteins coded by this new element shows striking similarities to both Ulysses and Osvaldo elements, two LTR retrotransposons, present in D. virilis and D. buzzatii, respectively. Comparisons of the predicted Isis RT to several known retrotransposons show strong phylogenetic relationships to gypsy-like elements, particulary to Ulysses retrotransposon. Studies of Isis chromosomal distribution show a strong hybridization signal in centromeric and pericentromeric regions, and a scattered distribution along all chromosomal arms. The existence of insertional polymorphisms between different strains and high molecular weight bands by Southern blot suggests the existence of full-sized copies that have been active recently. The presence of euchromatic insertion sites coincident between Isis and Osvaldo could indicate preferential insertion sites of Osvaldo element into Isis sequence or vice versa. Moreover, the presence of Isis in different species of the buzzatii complex indicates the ancient origin of this element.

  15. Sequence Detection for PPM Optical Communication With ISI

    NASA Technical Reports Server (NTRS)

    Moision, Bruce; Srinivasan, Meera; Lee, Clement

    2006-01-01

    A method of sequence detection has been proposed to mitigate the effects of inter-slot interference and inter-symbol interference (both denoted ISI) in the reception of M-ary pulse-position modulation (PPM) optical signals. The method would make it possible to reduce the error rate for a given slot duration, to use a shorter slot duration (and, hence, to communicate at a higher rate) without exceeding a given error rate, or to use a lower-bandwidth (and, hence, less-expensive) receiver to receive a signal of a given slot width without exceeding a given error rate. In M-ary PPM, a symbol period is divided into M time slots, each of duration T(sub s), and a symbol consists of a binary sequence ones and zeros represented by pulses or the absence of pulses, respectively, in the time slots. At the transmitter, the bit stream is used to modulate a laser, the output of which is constant (either full power or zero power, representing 1 or 0, respectively) during each time slot. However, the signal becomes attenuated (signal photons are lost) in propagation from the transmitter to the receiver and noise enters at the receiver, complicating the problem of determining the timing of the symbol periods and slots and identifying the symbols.

  16. Initial ion composition results from the Isis 2 satellite

    NASA Technical Reports Server (NTRS)

    Hoffman, J. H.; Dodson, W. H.; Lippincott, C. R.; Hammack, H. D.

    1974-01-01

    Isis 2 satellite carried, among other ionospheric instruments an ion mass spectrometer designed to measure the composition of the ionosphere in the mass range from 1 to 64 amu. The satellite, in a nearly constant 1400-km orbit, was launched on April 1, 1971. Examples of data show a wide variation in ion composition from 99% H(+) at night near the equator to greater than 95% O(+) and N(+) in the daytime poleward of the plasmapause. Both H(+) and He(+) are observed to be streaming outward from the high-latitude regions with velocities of several kilometers per second (the polar wind), determined from phase shifts in roll modulation maximums between light and heavy ion species. During the August 1972 magnetic storm a unique ionosphere developed, consisting of N(+) as the dominant species between 55 and 80 deg invariant latitude (above the plasmapause) and N2(+), NO(+), and O2(+) at the 1000 per cu cm concentration level, whereas these molecular species are usually below the detection limit of 1 ion per cu cm in quiet times at this altitude.

  17. An observation of polar auroral and airglow from the ISIS-II spacecraft.

    NASA Technical Reports Server (NTRS)

    Shepherd, G. G.; Anger, C. D.; Brace, L. H.; Maier, E. J.; Burrows, J. R.; Heikkila, W. J.; Hoffman, J.; Whitteker, J. H.

    1973-01-01

    This is a preliminary but comprehensive report on coordinated data obtained with the ISIS-II spacecraft, fourth in the ISIS series, launched 1 April 1971, into a near circular 1400 km orbit. The capabilities of the ISIS-I spacecraft have been extended in a number of ways, including the global mapping of the 3914, 5577 and 6300 A emissions. Data obtained during a 30-min pass over the south pole depict the nightside oval and polar cap, as well as mid-latitude airglow effects; these data are described and discussed.

  18. 9 CFR 355.3 - Plants eligible for inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Plants eligible for inspection. 355.3... § 355.3 Plants eligible for inspection. Upon application, inspection may be granted at a plant where... plant meets with the requirements of this part. Application for Inspection, Certification,...

  19. 9 CFR 355.3 - Plants eligible for inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Plants eligible for inspection. 355.3... § 355.3 Plants eligible for inspection. Upon application, inspection may be granted at a plant where... plant meets with the requirements of this part. Application for Inspection, Certification,...

  20. 9 CFR 355.3 - Plants eligible for inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Plants eligible for inspection. 355.3... § 355.3 Plants eligible for inspection. Upon application, inspection may be granted at a plant where... plant meets with the requirements of this part. Application for Inspection, Certification,...

  1. 9 CFR 355.3 - Plants eligible for inspection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Plants eligible for inspection. 355.3... § 355.3 Plants eligible for inspection. Upon application, inspection may be granted at a plant where... plant meets with the requirements of this part. Application for Inspection, Certification,...

  2. 9 CFR 355.3 - Plants eligible for inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Plants eligible for inspection. 355.3... § 355.3 Plants eligible for inspection. Upon application, inspection may be granted at a plant where... plant meets with the requirements of this part. Application for Inspection, Certification,...

  3. Organizing knowledge in the Isis bibliography from Sarton to the early twenty-first century.

    PubMed

    Weldon, Stephen P

    2013-09-01

    This essay explores various ways in which bibliographies have exhibited "sociality." Bibliographies are both products of the social contexts that have created them and engines of social interaction in scholarly communities. By tracing the history of the Isis Bibliography, the longest-running and most comprehensive bibliography in its field, this essay explains how different Isis classification systems have been tied to major twentieth-century cataloging efforts. By looking at classification, the essay also attends to the ways in which aspects of the Isis Bibliography in different decades have reflected social mores of their period. Finally, it demonstrates how critical the Isis Bibliography was in the formation of the discipline of history of science and goes on to discuss how that disciplinary connection is evolving in the twenty-first century. By thinking of the bibliography as a network of scholars, not just scholarly works, the essay asks us to reflect on the nature and purpose of bibliography in the digital age.

  4. Plasma protein binding of an antisense oligonucleotide targeting human ICAM-1 (ISIS 2302).

    PubMed

    Watanabe, Tanya A; Geary, Richard S; Levin, Arthur A

    2006-01-01

    In vitro ultrafiltration was used to determine the plasma protein-binding characteristics of phosphorothioate oligonucleotides (PS ODNs). Although there are binding data on multiple PS ODNs presented here, the focus of this research is on the protein-binding characteristics of ISIS 2302, a PS ODN targeting human intercellular adhesion molecule-1 (ICAM-1) mRNA, which is currently in clinical trials for the treatment of ulcerative colitis. ISIS 2302 was shown to be highly bound (> 97%) across species (mouse, rat, monkey, human), with the mouse having the least degree of binding. ISIS 2302 was highly bound to albumin and, to a lesser, extent alpha2-macroglobulin and had negligible binding to alpha1-acid glycoprotein. Ten shortened ODN metabolites (8, 10, and 12-19 nucleotides [nt] in length, truncated from the 3' end) were evaluated in human plasma. The degree of binding was reduced as the ODN metabolite length decreased. Three additional 20-nt (20-mer) PS ODNs (ISIS 3521, ISIS 2503, and ISIS 5132) of varying sequence but similar chemistry were evaluated. Although the tested PS ODNs were highly bound to plasma proteins, suggesting a commonality within the chemical class, these results suggested that the protein-binding characteristics in human plasma may be sequence dependent. Lastly, drug displacement studies with ISIS 2302 and other concomitant drugs with known protein-binding properties were conducted to provide information on potential drug interactions. Coadministered ISIS 2302 and other high-binding drugs evaluated in this study did not displace one another at supraclinical plasma concentrations and, thus, are not anticipated to cause any pharmacokinetic interaction in the clinic as a result of the displacement of binding to plasma proteins.

  5. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station? 63.11089 Section 63.11089 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities...

  6. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station? 63.11089 Section 63.11089 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities...

  7. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station? 63.11089 Section 63.11089 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities...

  8. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station, or pipeline pumping station? 63.11089 Section 63.11089 Protection of Environment ENVIRONMENTAL... Source Category: Gasoline Distribution Bulk Terminals, Bulk Plants, and Pipeline Facilities...

  9. Visual inspection for CTBT verification

    SciTech Connect

    Hawkins, W.; Wohletz, K.

    1997-03-01

    On-site visual inspection will play an essential role in future Comprehensive Test Ban Treaty (CTBT) verification. Although seismic and remote sensing techniques are the best understood and most developed methods for detection of evasive testing of nuclear weapons, visual inspection can greatly augment the certainty and detail of understanding provided by these more traditional methods. Not only can visual inspection offer ``ground truth`` in cases of suspected nuclear testing, but it also can provide accurate source location and testing media properties necessary for detailed analysis of seismic records. For testing in violation of the CTBT, an offending party may attempt to conceal the test, which most likely will be achieved by underground burial. While such concealment may not prevent seismic detection, evidence of test deployment, location, and yield can be disguised. In this light, if a suspicious event is detected by seismic or other remote methods, visual inspection of the event area is necessary to document any evidence that might support a claim of nuclear testing and provide data needed to further interpret seismic records and guide further investigations. However, the methods for visual inspection are not widely known nor appreciated, and experience is presently limited. Visual inspection can be achieved by simple, non-intrusive means, primarily geological in nature, and it is the purpose of this report to describe the considerations, procedures, and equipment required to field such an inspection.

  10. Fully Employing Software Inspections Data

    NASA Technical Reports Server (NTRS)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  11. Industrial Inspection System

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Lixi, Inc. has built a thriving business on NASA-developed x-ray technology. The Low Intensity X-ray Imaging scope (LIXI) was designed to use less than one percent of radiation required by conventional x-ray devices. It is portable and can be used for a variety of industrial inspection systems as well as medical devices. A food processing plant uses the new LIXI Conveyor system to identify small bone fragments in chicken. The chicken packages on a conveyor belt enter an x-ray chamber and the image is displayed on a monitor. Defects measuring less than a millimeter can be detected. An important advantage of the system is its ability to inspect 100 percent of the product right on the production line.

  12. The siderophilic cyanobacterium Leptolyngbya sp. strain JSC-1 acclimates to iron starvation by expressing multiple isiA-family genes.

    PubMed

    Shen, Gaozhong; Gan, Fei; Bryant, Donald A

    2016-06-01

    In the evolution of different cyanobacteria performing oxygenic photosynthesis, the core complexes of the two photosystems were highly conserved. However, cyanobacteria exhibit significant diversification in their light-harvesting complexes and have flexible regulatory mechanisms to acclimate to changes in their growth environments. In the siderophilic, filamentous cyanobacterium, Leptolyngbya sp. strain JSC-1, five different isiA-family genes occur in two gene clusters. During acclimation to Fe limitation, relative transcript levels for more than 600 genes increased more than twofold. Relative transcript levels were ~250 to 300 times higher for the isiA1 gene cluster (isiA1-isiB-isiC), and ~440- to 540-fold for the isiA2-isiA3-isiA4-cpcG2-isiA5 gene cluster after 48 h of iron starvation. Chl-protein complexes were isolated and further purified from cells grown under Fe-replete and Fe-depleted conditions. A single class of particles, trimeric PSI, was identified by image analysis of electron micrographs of negatively stained PSI complexes from Fe-replete cells. However, three major classes of particles were observed for the Chl-protein supercomplexes from cells grown under iron starvation conditions. Based on LC-MS-MS analyses, the five IsiA-family proteins were found in the largest supercomplexes together with core components of the two photosystems; however, IsiA5 was not present in complexes in which only the core subunits of PSI were detected. IsiA5 belongs to the same clade as PcbC proteins in a phylogenetic classification, and it is proposed that IsiA5 is most likely involved in supercomplexes containing PSII dimers. IsiA4, which is a fusion of an IsiA domain and a C-terminal PsaL domain, was found together with IsiA1, IsiA2, and IsiA3 in complexes with monomeric PSI. The data indicate that horizontal gene transfer, gene duplication, and divergence have played important roles in the adaptive evolution of this cyanobacterium to iron starvation conditions.

  13. 47 CFR 78.57 - Station inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Station inspection. 78.57 Section 78.57 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE General Operating Requirements § 78.57 Station inspection. The station and all records required...

  14. 47 CFR 78.57 - Station inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Station inspection. 78.57 Section 78.57 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE General Operating Requirements § 78.57 Station inspection. The station and all records required...

  15. 47 CFR 78.57 - Station inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Station inspection. 78.57 Section 78.57 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE General Operating Requirements § 78.57 Station inspection. The station and all records required...

  16. 47 CFR 78.57 - Station inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Station inspection. 78.57 Section 78.57 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE General Operating Requirements § 78.57 Station inspection. The station and all records required...

  17. 47 CFR 78.57 - Station inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Station inspection. 78.57 Section 78.57 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES CABLE TELEVISION RELAY SERVICE General Operating Requirements § 78.57 Station inspection. The station and all records required...

  18. Integrated Science Investigation of the Sun (ISIS): Design of the Energetic Particle Investigation

    NASA Technical Reports Server (NTRS)

    McComas, D. J.; Alexander, N.; Angold, N.; Bale, S.; Beebe, C.; Birdwell, B.; Boyle, M.; Burgum, J. M.; Burnham, J. A.; Christian, E. R.; Shuman, S.; von Rosenvinge, T. T.

    2014-01-01

    The Integrated Science Investigation of the Sun (ISIS) is a complete science investigation on the Solar Probe Plus (SPP) mission, which flies to within nine solar radii of the Sun's surface. ISIS comprises a two-instrument suite to measure energetic particles over a very broad energy range, as well as coordinated management, science operations, data processing, and scientific analysis. Together, ISIS observations allow us to explore the mechanisms of energetic particles dynamics, including their: (1) Origins-defining the seed populations and physical conditions necessary for energetic particle acceleration; (2) Acceleration-determining the roles of shocks, reconnection, waves, and turbulence in accelerating energetic particles; and (3) Transport-revealing how energetic particles propagate from the corona out into the heliosphere. The two ISIS Energetic Particle Instruments measure lower (EPI-Lo) and higher (EPI-Hi) energy particles. EPI-Lo measures ions and ion composition from approx. 20 keV/nucleon-15 MeV total energy and electrons from approx.25-1000 keV. EPI-Hi measures ions from approx. 1-200 MeV/nucleon and electrons from approx. 0.5-6 MeV. EPI-Lo comprises 80 tiny apertures with fields-of-view (FOVs) that sample over nearly a complete hemisphere, while EPI-Hi combines three telescopes that together provide five large-FOV apertures. ISIS observes continuously inside of 0.25 AU with a high data collection rate and burst data (EPI-Lo) coordinated with the rest of the SPP payload; outside of 0.25 AU, ISIS runs in low-rate science mode whenever feasible to capture as complete a record as possible of the solar energetic particle environment and provide calibration and continuity for measurements closer in to the Sun. The ISIS Science Operations Center plans and executes commanding, receives and analyzes all ISIS data, and coordinates science observations and analyses with the rest of the SPP science investigations. Together, ISIS' unique observations on SPP will

  19. Integrated Science Investigation of the Sun (ISIS): Design of the Energetic Particle Investigation

    NASA Astrophysics Data System (ADS)

    McComas, D. J.; Alexander, N.; Angold, N.; Bale, S.; Beebe, C.; Birdwell, B.; Boyle, M.; Burgum, J. M.; Burnham, J. A.; Christian, E. R.; Cook, W. R.; Cooper, S. A.; Cummings, A. C.; Davis, A. J.; Desai, M. I.; Dickinson, J.; Dirks, G.; Do, D. H.; Fox, N.; Giacalone, J.; Gold, R. E.; Gurnee, R. S.; Hayes, J. R.; Hill, M. E.; Kasper, J. C.; Kecman, B.; Klemic, J.; Krimigis, S. M.; Labrador, A. W.; Layman, R. S.; Leske, R. A.; Livi, S.; Matthaeus, W. H.; McNutt, R. L.; Mewaldt, R. A.; Mitchell, D. G.; Nelson, K. S.; Parker, C.; Rankin, J. S.; Roelof, E. C.; Schwadron, N. A.; Seifert, H.; Shuman, S.; Stokes, M. R.; Stone, E. C.; Vandegriff, J. D.; Velli, M.; von Rosenvinge, T. T.; Weidner, S. E.; Wiedenbeck, M. E.; Wilson, P.

    2016-12-01

    The Integrated Science Investigation of the Sun (ISIS) is a complete science investigation on the Solar Probe Plus (SPP) mission, which flies to within nine solar radii of the Sun's surface. ISIS comprises a two-instrument suite to measure energetic particles over a very broad energy range, as well as coordinated management, science operations, data processing, and scientific analysis. Together, ISIS observations allow us to explore the mechanisms of energetic particles dynamics, including their: (1) Origins—defining the seed populations and physical conditions necessary for energetic particle acceleration; (2) Acceleration—determining the roles of shocks, reconnection, waves, and turbulence in accelerating energetic particles; and (3) Transport—revealing how energetic particles propagate from the corona out into the heliosphere. The two ISIS Energetic Particle Instruments measure lower (EPI-Lo) and higher (EPI-Hi) energy particles. EPI-Lo measures ions and ion composition from ˜20 keV/nucleon-15 MeV total energy and electrons from ˜25-1000 keV. EPI-Hi measures ions from ˜1-200 MeV/nucleon and electrons from ˜0.5-6 MeV. EPI-Lo comprises 80 tiny apertures with fields-of-view (FOVs) that sample over nearly a complete hemisphere, while EPI-Hi combines three telescopes that together provide five large-FOV apertures. ISIS observes continuously inside of 0.25 AU with a high data collection rate and burst data (EPI-Lo) coordinated with the rest of the SPP payload; outside of 0.25 AU, ISIS runs in low-rate science mode whenever feasible to capture as complete a record as possible of the solar energetic particle environment and provide calibration and continuity for measurements closer in to the Sun. The ISIS Science Operations Center plans and executes commanding, receives and analyzes all ISIS data, and coordinates science observations and analyses with the rest of the SPP science investigations. Together, ISIS' unique observations on SPP will enable the

  20. In-service Inspection of Radioactive Waste Tanks at the Savannah River Site – 15410

    SciTech Connect

    Wiersma, Bruce; Maryak, Matthew; Baxter, Lindsay; Harris, Stephen; Elder, James

    2015-01-12

    Liquid radioactive wastes from the Savannah River Site (SRS) separation process are stored in large underground carbon steel tanks. The high level wastes are processed in several of the tanks and then transferred by piping to other site facilities for further processing before they are stabilized in a vitrified or grout waste form. Based on waste removal and processing schedules, many of the tanks will be required to be in service for times exceeding the initial intended life. Until the waste is removed from storage, transferred, and processed, the materials and structures of the tanks must maintain a confinement function by providing a barrier to the environment and by maintaining acceptable structural stability during design basis events, which include loadings from both normal service and abnormal (e.g., earthquake) conditions. A structural integrity program is in place to maintain the structural and leak integrity functions of these waste tanks throughout their intended service life. In-service inspection (ISI) is an essential element of a comprehensive structural integrity program for the waste tanks at the Savannah River Site (SRS). The ISI program was developed to determine the degree of degradation the waste tanks have experienced due to service conditions. As a result of the inspections, an assessment can be made of the effectiveness of corrosion controls for the waste chemistry, which precludes accelerated localized and general corrosion of the waste tanks. Ultrasonic inspections (UT) are performed to detect and quantify the degree of general wall thinning, pitting and cracking as a measure of tank degradation. The results from these inspections through 2013, for the 27 Type III/IIIA tanks, indicate no reportable in-service corrosion degradation in the primary tank (i.e., general, pitting, or cracking). The average wall thickness for all tanks remains above the manufactured nominal thickness minus 0.25 millimeter and the largest pit identified is

  1. Investigation of ISIS and Brookhaven National Laboratory ion source electrodes after extended operation.

    PubMed

    Lettry, J; Alessi, J; Faircloth, D; Gerardin, A; Kalvas, T; Pereira, H; Sgobba, S

    2012-02-01

    Linac4 accelerator of Centre Européen de Recherches Nucléaires is under construction and a RF-driven H(-) ion source is being developed. The beam current requirement for Linac4 is very challenging: 80 mA must be provided. Cesiated plasma discharge ion sources such as Penning or magnetron sources are also potential candidates. Accelerator ion sources must achieve typical reliability figures of 95% and above. Investigating and understanding the underlying mechanisms involved with source failure or ageing is critical when selecting the ion source technology. Plasma discharge driven surface ion sources rely on molybdenum cathodes. Deformation of the cathode surfaces is visible after extended operation periods. A metallurgical investigation of an ISIS ion source is presented. The origin of the deformation is twofold: Molybdenum sputtering by cesium ions digs few tenths of mm cavities while a growth of molybdenum is observed in the immediate vicinity. The molybdenum growth under hydrogen atmosphere is hard and loosely bound to the bulk. It is, therefore, likely to peel off and be transported within the plasma volume. The observation of the cathode, anode, and extraction electrodes of the magnetron source operated at BNL for two years are presented. A beam simulation of H(-), electrons, and Cs(-) ions was performed with the IBSimu code package to qualitatively explain the observations. This paper describes the operation conditions of the ion sources and discusses the metallurgical analysis and beam simulation results.

  2. Investigation of ISIS and Brookhaven National Laboratory ion source electrodes after extended operation

    SciTech Connect

    Lettry, J.; Gerardin, A.; Pereira, H.; Sgobba, S.; Alessi, J.; Faircloth, D.; Kalvas, T.

    2012-02-15

    Linac4 accelerator of Centre Europeen de Recherches Nucleaires is under construction and a RF-driven H{sup -} ion source is being developed. The beam current requirement for Linac4 is very challenging: 80 mA must be provided. Cesiated plasma discharge ion sources such as Penning or magnetron sources are also potential candidates. Accelerator ion sources must achieve typical reliability figures of 95% and above. Investigating and understanding the underlying mechanisms involved with source failure or ageing is critical when selecting the ion source technology. Plasma discharge driven surface ion sources rely on molybdenum cathodes. Deformation of the cathode surfaces is visible after extended operation periods. A metallurgical investigation of an ISIS ion source is presented. The origin of the deformation is twofold: Molybdenum sputtering by cesium ions digs few tenths of mm cavities while a growth of molybdenum is observed in the immediate vicinity. The molybdenum growth under hydrogen atmosphere is hard and loosely bound to the bulk. It is, therefore, likely to peel off and be transported within the plasma volume. The observation of the cathode, anode, and extraction electrodes of the magnetron source operated at BNL for two years are presented. A beam simulation of H{sup -}, electrons, and Cs{sup -} ions was performed with the IBSimu code package to qualitatively explain the observations. This paper describes the operation conditions of the ion sources and discusses the metallurgical analysis and beam simulation results.

  3. Investigation of ISIS and Brookhaven National Laboratory ion source electrodes after extended operation

    SciTech Connect

    Lettry J.; Alessi J.; Faircloth, D.; Gerardin, A.; Kalvas, T.; Pereira, H.; Sgobba, S.

    2012-02-23

    Linac4 accelerator of Centre Europeen de Recherches Nucleaires is under construction and a RF-driven H{sup -} ion source is being developed. The beam current requirement for Linac4 is very challenging: 80 mA must be provided. Cesiated plasma discharge ion sources such as Penning or magnetron sources are also potential candidates. Accelerator ion sources must achieve typical reliability figures of 95% and above. Investigating and understanding the underlying mechanisms involved with source failure or ageing is critical when selecting the ion source technology. Plasma discharge driven surface ion sources rely on molybdenum cathodes. Deformation of the cathode surfaces is visible after extended operation periods. A metallurgical investigation of an ISIS ion source is presented. The origin of the deformation is twofold: Molybdenum sputtering by cesium ions digs few tenths of mm cavities while a growth of molybdenum is observed in the immediate vicinity. The molybdenum growth under hydrogen atmosphere is hard and loosely bound to the bulk. It is, therefore, likely to peel off and be transported within the plasma volume. The observation of the cathode, anode, and extraction electrodes of the magnetron source operated at BNL for two years are presented. A beam simulation of H{sup -}, electrons, and Cs{sup -} ions was performed with the IBSimu code package to qualitatively explain the observations. This paper describes the operation conditions of the ion sources and discusses the metallurgical analysis and beam simulation results.

  4. Investigation of ISIS and Brookhaven National Laboratory ion source electrodes after extended operationa)

    NASA Astrophysics Data System (ADS)

    Lettry, J.; Alessi, J.; Faircloth, D.; Gerardin, A.; Kalvas, T.; Pereira, H.; Sgobba, S.

    2012-02-01

    Linac4 accelerator of Centre Européen de Recherches Nucléaires is under construction and a RF-driven H- ion source is being developed. The beam current requirement for Linac4 is very challenging: 80 mA must be provided. Cesiated plasma discharge ion sources such as Penning or magnetron sources are also potential candidates. Accelerator ion sources must achieve typical reliability figures of 95% and above. Investigating and understanding the underlying mechanisms involved with source failure or ageing is critical when selecting the ion source technology. Plasma discharge driven surface ion sources rely on molybdenum cathodes. Deformation of the cathode surfaces is visible after extended operation periods. A metallurgical investigation of an ISIS ion source is presented. The origin of the deformation is twofold: Molybdenum sputtering by cesium ions digs few tenths of mm cavities while a growth of molybdenum is observed in the immediate vicinity. The molybdenum growth under hydrogen atmosphere is hard and loosely bound to the bulk. It is, therefore, likely to peel off and be transported within the plasma volume. The observation of the cathode, anode, and extraction electrodes of the magnetron source operated at BNL for two years are presented. A beam simulation of H-, electrons, and Cs- ions was performed with the IBSimu code package to qualitatively explain the observations. This paper describes the operation conditions of the ion sources and discusses the metallurgical analysis and beam simulation results.

  5. 14 CFR 135.427 - Manual requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... inspection findings (buy-back procedures). (5) Procedures, standards, and limits necessary for required... decision of an inspector regarding any required inspection from being countermanded by persons other...

  6. Topomapping of Mars with HRSC images, ISIS, and a commercial stereo workstation

    NASA Astrophysics Data System (ADS)

    Kirk, R. L.; Howington-Kraus, E.; Galuszka, D.; Redding, B.; Hare, T. M.

    either in SOCET SET or in ISIS after exporting the DTM data back to it. This workflow was modified slightly for HRSC to take advantage of the standard processing performed at the DLR. As the first step in DTM production, we import VICAR Level 2 files (radiometrically calibrated but still in the raw camera geometry) into ISIS where they can immediately be used or exported to SOCET SET. HRSC Level 3 and 4 products (DTMs and orthorectified images) can also be imported and used as map-projected data (e.g., Level 4 DTMs from DLR can be compared with those produced in SOCET SET). Our results for images from orbit h1235 (covering western Candor Chasma) and the adjacent orbits h0894, h0905, h0927 (Nanedi Valles), are encouraging even though we were unable to take full advantage of the multiple-line design of HRSC in the analysis. The version of SOCET SET used (5.2) does not allow for the introduction of constraints in the bundle adjustment to ensure that the images from a single HRSC orbit share the same trajectory and pointing history. We therefore computed offsets to the trajectory and pointing angles for each image of the set as if they were fully independent Furthermore, a limitation of the existing SOCET (and ISIS) pushbroom scanner sensor models is that the exposure time per line is taken as constant for each image. HRSC is generally operated so that the line time changes multiple times per orbit, requiring us to split each VICAR image into multiple files for processing. Because the segments of each image could not be constrained to have consistent adjustments, the DTM of Nanedi Valles produced from these image segments contained small discontinuities at the segment boundaries. This problem did not arise for Candor Chasma 2 because the entire study area was covered without changes in the time per image line. The latest release of SOCET SET (5.3) incorporates the ability to do constrained bundle adjustment and should solve these problems. In addition, we are modifying the

  7. Through-pellicle defect inspection of EUV masks using an ArF-based inspection tool

    NASA Astrophysics Data System (ADS)

    Goldfarb, Dario L.; Broadbent, William; Wylie, Mark; Felix, Nelson; Corliss, Daniel

    2016-03-01

    The use of EUV photomasks in a semiconductor manufacturing environment requires their periodic inspection to ensure they are continually free of defects that could impact device yield. Defects typically occur from fall-on particles or from surface degradation such as "haze". The proposed use of a polycrystalline-based EUV pellicle to prevent fall-on particles would preclude periodic through-pellicle mask defect inspection using e-beam, as well as, DUV inspection tools (the pellicle is opaque at DUV wavelengths). Thus, to use these types of defect inspection tools would require removal of the EUV pellicle before inspection. After inspection, the pellicle would need to be re-attached and the mask re-qualified using a test wafer, thus causing expense and delays. While EUV-wavelength inspection tools could inspect through such a pellicle precluding the need to remove the pellicle, these tools are not likely to be available in the commercial marketplace for many years. An alternate EUV pellicle material has been developed that is semi-transparent to 193nm wavelengths, thus allowing through-pellicle inspection using existing ArF-based, or other 193nm wavelength mask inspection tools. This eliminates the requirement to remove the pellicle for defect inspection and the associated time and expense. In this work, we will conduct an initial evaluation of through-pellicle EUV mask defect inspection using an existing 193nm mask inspection tool. This initial evaluation will include durability of the pellicle to defect inspection, and impact of the pellicle on inspection tool performance.

  8. Thermographic inspection of pipes, tanks, and containment liners

    NASA Astrophysics Data System (ADS)

    Renshaw, Jeremy B.; Lhota, James R.; Muthu, Nathan; Shepard, Steven M.

    2015-03-01

    Nuclear power plants are required to operate at a high level of safety. Recent industry and license renewal commitments aim to further increase safety by requiring the inspection of components that have not traditionally undergone detailed inspected in the past, such as tanks and liners. NEI 09-14 requires the inspection of buried pipes and tanks while containment liner inspections are required as a part of license renewal commitments. Containment liner inspections must inspect the carbon steel liner for defects - such as corrosion - that could threaten the pressure boundary and ideally, should be able to inspect the surrounding concrete for foreign material that could be in contact with the steel liner and potentially initiate corrosion. Such an inspection requires a simultaneous evaluation of two materials with very different material properties. Rapid, yet detailed, inspection results are required due to the massive size of the tanks and containment liners to be inspected. For this reason, thermal NDE methods were evaluated to inspect tank and containment liner mockups with simulated defects. Thermographic Signal Reconstruction (TSR) was utilized to enhance the images and provide detailed information on the sizes and shapes of the observed defects. The results show that thermographic inspection is highly sensitive to the defects of interest and is capable of rapidly inspecting large areas.

  9. Thermographic inspection of pipes, tanks, and containment liners

    SciTech Connect

    Renshaw, Jeremy B. Muthu, Nathan; Lhota, James R.; Shepard, Steven M.

    2015-03-31

    Nuclear power plants are required to operate at a high level of safety. Recent industry and license renewal commitments aim to further increase safety by requiring the inspection of components that have not traditionally undergone detailed inspected in the past, such as tanks and liners. NEI 09-14 requires the inspection of buried pipes and tanks while containment liner inspections are required as a part of license renewal commitments. Containment liner inspections must inspect the carbon steel liner for defects - such as corrosion - that could threaten the pressure boundary and ideally, should be able to inspect the surrounding concrete for foreign material that could be in contact with the steel liner and potentially initiate corrosion. Such an inspection requires a simultaneous evaluation of two materials with very different material properties. Rapid, yet detailed, inspection results are required due to the massive size of the tanks and containment liners to be inspected. For this reason, thermal NDE methods were evaluated to inspect tank and containment liner mockups with simulated defects. Thermographic Signal Reconstruction (TSR) was utilized to enhance the images and provide detailed information on the sizes and shapes of the observed defects. The results show that thermographic inspection is highly sensitive to the defects of interest and is capable of rapidly inspecting large areas.

  10. Early detection of autism spectrum disorder in young isiZulu-speaking children in South Africa.

    PubMed

    Chambers, Nola J; Wetherby, Amy M; Stronach, Sheri T; Njongwe, Nonyameko; Kauchali, Shuaib; Grinker, Richard R

    2016-06-22

    Culturally appropriate tools are needed for detecting symptoms of autism spectrum disorder in young South African children. The objectives of this study were to (1) adapt and translate into isiZulu existing measures for detecting early signs of autism spectrum disorder, (2) use the measures to characterize and compare behavioural profiles of young isiZulu-speaking children with and without autism spectrum disorder and (3) compare symptom profiles across sampling procedures. Measures were translated and adapted into isiZulu and used to evaluate 26 isiZulu-speaking children, 15 children with no reported developmental concerns and 11 referred for suspected autism spectrum disorder. A video-recorded observation of children and caregivers in their home environment was also made. Based on best-estimate diagnoses, 10 children were classified as autism spectrum disorder and 16 as non-autism spectrum disorder. The children with autism spectrum disorder presented with significantly more autism spectrum disorder red flags than the non-autism spectrum disorder group according to parent report and systematic ratings of red flags. Significant correlations between parent report and observational measures of red flags were observed. More red flags were observed during structured evaluations than home observations in the autism spectrum disorder group. Findings provide a foundation for tool translation and adaptation in South Africa and identifying social communication markers to detect autism spectrum disorder in young isiZulu-speaking children.

  11. The ISIS Story - Science Return from Rescuing, Archiving and Analyzing a Unique Dataset

    NASA Astrophysics Data System (ADS)

    Bilitza, D.; Benson, R. F.; Reinisch, B. W.; Huang, X.

    2009-12-01

    The Alouette and ISIS topside sounder satellites recorded a great wealth of information about the topside ionosphere during their long periods of operation (from 1962 to 1990). Even though more than 700 publications resulted from this project, only a small percentage of the dataset was analyzed during the mission life time. The soundings were stored on more than 100,000 seven-track analog telemetry tapes. In the mid-nineties space limitations and storage costs threatened an imminent loss of these tapes. Only a last minute intervention spear-headed by NASA’s Ionosphere, Thermosphere, Mesosphere (ITM) Data Evaluation Panel saved a significant portion of these tapes and with funding from the AISRP program these data were first digitized and then converted into electron density profiles. This data restoration effort more than tripled the Alouette/ISIS topside sounder data base and has led to significant improvements of models for the topside ionosphere, e.g., about a factor of 2 improvement in the case of the IRI-2007 topside electron density profile. We will present a brief history of this successful data restoration effort and will highlight the science dividends this investment has produced. The homepage for the ISIS project is at http://nssdc.gsfc.nasa.gov/space/isis/isis-status.html.

  12. 40 CFR 792.15 - Inspection of a testing facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... inspect (and in the case of records also to copy) all records and specimens required to be maintained regarding studies to which this part applies. The records inspection and copying requirements shall not... that refuses to permit inspection in accordance with this part. The determination that a study will...

  13. 7 CFR 42.135 - Normal, tightened or reduced on-line inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....135 Section 42.135 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND... be used except when the history of inspection permits reduced inspection or requires...

  14. 7 CFR 42.135 - Normal, tightened or reduced on-line inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....135 Section 42.135 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND... be used except when the history of inspection permits reduced inspection or requires...

  15. Building a Comprehensive Mill-Level Database for the Industrial Sectors Integrated Solutions (ISIS) Model of the U.S. Pulp and Paper Sector

    PubMed Central

    Modak, Nabanita; Spence, Kelley; Sood, Saloni; Rosati, Jacky Ann

    2015-01-01

    Air emissions from the U.S. pulp and paper sector have been federally regulated since 1978; however, regulations are periodically reviewed and revised to improve efficiency and effectiveness of existing emission standards. The Industrial Sectors Integrated Solutions (ISIS) model for the pulp and paper sector is currently under development at the U.S. Environmental Protection Agency (EPA), and can be utilized to facilitate multi-pollutant, sector-based analyses that are performed in conjunction with regulatory development. The model utilizes a multi-sector, multi-product dynamic linear modeling framework that evaluates the economic impact of emission reduction strategies for multiple air pollutants. The ISIS model considers facility-level economic, environmental, and technical parameters, as well as sector-level market data, to estimate the impacts of environmental regulations on the pulp and paper industry. Specifically, the model can be used to estimate U.S. and global market impacts of new or more stringent air regulations, such as impacts on product price, exports and imports, market demands, capital investment, and mill closures. One major challenge to developing a representative model is the need for an extensive amount of data. This article discusses the collection and processing of data for use in the model, as well as the methods used for building the ISIS pulp and paper database that facilitates the required analyses to support the air quality management of the pulp and paper sector. PMID:25806516

  16. Building a comprehensive mill-level database for the Industrial Sectors Integrated Solutions (ISIS) model of the U.S. pulp and paper sector.

    PubMed

    Modak, Nabanita; Spence, Kelley; Sood, Saloni; Rosati, Jacky Ann

    2015-01-01

    Air emissions from the U.S. pulp and paper sector have been federally regulated since 1978; however, regulations are periodically reviewed and revised to improve efficiency and effectiveness of existing emission standards. The Industrial Sectors Integrated Solutions (ISIS) model for the pulp and paper sector is currently under development at the U.S. Environmental Protection Agency (EPA), and can be utilized to facilitate multi-pollutant, sector-based analyses that are performed in conjunction with regulatory development. The model utilizes a multi-sector, multi-product dynamic linear modeling framework that evaluates the economic impact of emission reduction strategies for multiple air pollutants. The ISIS model considers facility-level economic, environmental, and technical parameters, as well as sector-level market data, to estimate the impacts of environmental regulations on the pulp and paper industry. Specifically, the model can be used to estimate U.S. and global market impacts of new or more stringent air regulations, such as impacts on product price, exports and imports, market demands, capital investment, and mill closures. One major challenge to developing a representative model is the need for an extensive amount of data. This article discusses the collection and processing of data for use in the model, as well as the methods used for building the ISIS pulp and paper database that facilitates the required analyses to support the air quality management of the pulp and paper sector.

  17. 9 CFR 500.6 - Withdrawal of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT RULES... establishment did not have or maintain a HACCP plan in accordance with part 417 of this chapter; (c)...

  18. 7 CFR 322.19 - Inspection; refusal of entry.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Restricted Organisms § 322.19 Inspection; refusal of entry. (a) APHIS may inspect any restricted organism at the time of importation to determine if the organism meets all of the requirements of this part....

  19. 7 CFR 322.19 - Inspection; refusal of entry.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Restricted Organisms § 322.19 Inspection; refusal of entry. (a) APHIS may inspect any restricted organism at the time of importation to determine if the organism meets all of the requirements of this part....

  20. 9 CFR 381.123 - Official inspection mark; official establishment number.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... every inspected and passed poultry product shall bear: (a) The official inspection legend; and (b) The... inspection and placed as follows: (1) Within the official inspection legend in the form required by subpart M of this part; or (2) Outside the official inspection legend elsewhere on the exterior of...

  1. 41 CFR 102-34.280 - What State inspections must we have for Government motor vehicles?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... inspections must we have for Government motor vehicles? You must have the following State inspections for Government motor vehicles: (a) Federally-mandated emissions inspections when required by the relevant State... inspections if the fee is not waived. GSA Fleet will pay the cost of these inspections for motor...

  2. 41 CFR 102-34.280 - What State inspections must we have for Government motor vehicles?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... inspections must we have for Government motor vehicles? You must have the following State inspections for Government motor vehicles: (a) Federally-mandated emissions inspections when required by the relevant State... inspections if the fee is not waived. GSA Fleet will pay the cost of these inspections for motor...

  3. 41 CFR 102-34.280 - What State inspections must we have for Government motor vehicles?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... inspections must we have for Government motor vehicles? You must have the following State inspections for Government motor vehicles: (a) Federally-mandated emissions inspections when required by the relevant State... inspections if the fee is not waived. GSA Fleet will pay the cost of these inspections for motor...

  4. 41 CFR 102-34.280 - What State inspections must we have for Government motor vehicles?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... inspections must we have for Government motor vehicles? You must have the following State inspections for Government motor vehicles: (a) Federally-mandated emissions inspections when required by the relevant State... inspections if the fee is not waived. GSA Fleet will pay the cost of these inspections for motor...

  5. 49 CFR 230.14 - Thirty-one (31) service day inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Thirty-one (31) service day inspection. 230.14... General Inspection Requirements § 230.14 Thirty-one (31) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 31 service day inspection after the...

  6. 49 CFR 230.15 - Ninety-two (92) service day inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Ninety-two (92) service day inspection. 230.15... General Inspection Requirements § 230.15 Ninety-two (92) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 92 service day inspection after the...

  7. 49 CFR 230.14 - Thirty-one (31) service day inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Thirty-one (31) service day inspection. 230.14... General Inspection Requirements § 230.14 Thirty-one (31) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 31 service day inspection after the...

  8. 49 CFR 230.14 - Thirty-one (31) service day inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Thirty-one (31) service day inspection. 230.14... General Inspection Requirements § 230.14 Thirty-one (31) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 31 service day inspection after the...

  9. 49 CFR 230.15 - Ninety-two (92) service day inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Ninety-two (92) service day inspection. 230.15... General Inspection Requirements § 230.15 Ninety-two (92) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 92 service day inspection after the...

  10. 49 CFR 230.14 - Thirty-one (31) service day inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Thirty-one (31) service day inspection. 230.14... General Inspection Requirements § 230.14 Thirty-one (31) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 31 service day inspection after the...

  11. 49 CFR 230.14 - Thirty-one (31) service day inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Thirty-one (31) service day inspection. 230.14... General Inspection Requirements § 230.14 Thirty-one (31) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 31 service day inspection after the...

  12. 49 CFR 230.15 - Ninety-two (92) service day inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Ninety-two (92) service day inspection. 230.15... General Inspection Requirements § 230.15 Ninety-two (92) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 92 service day inspection after the...

  13. 49 CFR 230.15 - Ninety-two (92) service day inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Ninety-two (92) service day inspection. 230.15... General Inspection Requirements § 230.15 Ninety-two (92) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 92 service day inspection after the...

  14. 49 CFR 230.15 - Ninety-two (92) service day inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Ninety-two (92) service day inspection. 230.15... General Inspection Requirements § 230.15 Ninety-two (92) service day inspection. (a) General. An individual competent to conduct the inspection shall perform the 92 service day inspection after the...

  15. Iterative nonlinear ISI cancellation in optical tilted filter-based Nyquist 4-PAM system

    NASA Astrophysics Data System (ADS)

    Ju, Cheng; Liu, Na

    2016-09-01

    The conventional double sideband (DSB) modulation and direct detection scheme suffers from severer power fading, linear and nonlinear inter-symbol interference (ISI) caused by fiber dispersion and square-law direct detection. The system's frequency response deteriorates at high frequencies owing to the limited device bandwidth. Moreover, the linear and nonlinear ISI is enhanced induced by the bandwidth limited effect. In this paper, an optical tilted filter is used to mitigate the effect of power fading, and improve the high frequency response of bandwidth limited device in Nyquist 4-ary pulse amplitude modulation (4-PAM) system. Furtherly, iterative technique is introduced to mitigate the nonlinear ISI caused by the combined effects of electrical Nyquist filter, limited device bandwidth, optical tilted filter, dispersion, and square-law photo-detection. Thus, the system's frequency response is greatly improved and the delivery distance can be extended.

  16. DE/ISIS conjunction comparisons of high-latitude electron density features

    NASA Technical Reports Server (NTRS)

    Hoegy, Walter R.; Benson, Robert F.

    1988-01-01

    This paper presents a comparison between the ISIS-1 and -2 topside sounder measurements of electron number density, N(e), with the in situ ion and N(e) measurements by the Langmuir probe aboard the Dynamics Explorer 2 (DE 2) during four high-latitude ISIS/DE magnetic field-aligned conjunctions. The ISIS-derived N(e) values, even at the greatest distance from the sounder, were found to agree with the Langmuir probe measurements to within about 30 percent over a density range of more than two decades on three of the four comparisons; the fourth comparison which included data with strong N(e) irregularities, showed a difference of 60 percent.

  17. On dependency properties of the ISIs generated by a two-compartmental neuronal model.

    PubMed

    Benedetto, Elisa; Sacerdote, Laura

    2013-02-01

    One-dimensional leaky integrate and fire neuronal models describe interspike intervals (ISIs) of a neuron as a renewal process and disregarding the neuron geometry. Many multi-compartment models account for the geometrical features of the neuron but are too complex for their mathematical tractability. Leaky integrate and fire two-compartment models seem a good compromise between mathematical tractability and an improved realism. They indeed allow to relax the renewal hypothesis, typical of one-dimensional models, without introducing too strong mathematical difficulties. Here, we pursue the analysis of the two-compartment model studied by Lansky and Rodriguez (Phys D 132:267-286, 1999), aiming of introducing some specific mathematical results used together with simulation techniques. With the aid of these methods, we investigate dependency properties of ISIs for different values of the model parameters. We show that an increase of the input increases the strength of the dependence between successive ISIs.

  18. Interim Service ISDN Satellite (ISIS) simulator development for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.

  19. ISY Mission to Planet Earth Conference: A planning meeting for the International Space Year

    NASA Technical Reports Server (NTRS)

    Meyerson, Harvey

    1991-01-01

    A major theme was the opportunity offered by the International Space Year (ISY) to initiate a long-term program of Earth observation mission coordination and worldwide data standardization. The challenge is immense and extremely time critical. A recommendation was made to inventory the capabilities of Earth observing spacecraft scheduled during the next decade. The ISY effort to strengthen coordination and standardization should emphasize global issues, and also regional initiatives of particular relevance to developing nations. The concepts of a Global Information System Test (GIST) was accepted and applied to specific issues of immediate concern. The importance of ISY Earth observation initiatives extending beyond research to include immediate and direct applications for social and economic development was stressed. Several specific Mission to Planet Earth proposals were developed during the Conference. A mechanism was set up for coordinating participation of the national space agencies or equivalent bodies.

  20. The ISIS Mission Concept: An Impactor for Surface and Interior Science

    NASA Technical Reports Server (NTRS)

    Chesley, Steven R.; Elliot, John O.; Abell, Paul A.; Asphaug, Erik; Bhaskaran, Shyam; Lam, Try; Lauretta, Dante S.

    2013-01-01

    The Impactor for Surface and Interior Science (ISIS) mission concept is a kinetic asteroid impactor mission to the target of NASA's OSIRIS-REx (Origins-Spectral Interpretation-Resource Identification-Security-Regolith Explorer) asteroid sample return mission. The ISIS mission concept calls for the ISIS spacecraft, an independent and autonomous smart impactor, to guide itself to a hyper-velocity impact with 1999 RQ36 while the OSIRIS-REx spacecraft observes the collision. Later the OSIRIS-REx spacecraft descends to reconnoiter the impact site and measure the momentum imparted to the asteroid through the impact before departing on its journey back to Earth. In this paper we discuss the planetary science, human exploration and impact mitigation drivers for mission, and we describe the current mission concept and flight system design.

  1. Coordinated ionospheric and magnetospheric observations from the ISIS 2 satellite by the ISIS 2 experimenters. Volume 1: Optical auroral images and related direct measurements

    NASA Technical Reports Server (NTRS)

    Murphree, J. S.

    1980-01-01

    A representative set of data from ISIS 2 covering a range of operating modes and geophysical conditions is presented. The data show the typical values and range of ionospheric and magnetospheric characteristics, as viewed from 1400 km with the ISIS 2 instruments. The definition of each data set depends partly on geophysical parameters and partly on satellite operating mode. Preceding the data set is a description of the organizational parameters and a review of the objectives and general characteristics of the data set. The data are shown as a selection from 12 different data formats. Each data has a different selection of formats, but uniformity of a given format selection is preserved throughout each data set.

  2. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM - 2011

    SciTech Connect

    West, B.; Waltz, R.

    2012-06-21

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. Inspections made during 2011 to evaluate these vessels and other waste handling facilities along with evaluations based on data from previous inspections are the subject of this report. The 2011 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. All inspections scheduled per SRR-LWE-2011-00026, HLW Tank Farm Inspection Plan for 2011, were completed. Ultrasonic measurements (UT) performed in 2011 met the requirements of C-ESR-G-00006, In-Service Inspection Program for High Level Waste Tanks, Rev. 3, and WSRC-TR-2002-00061, Rev.6. UT inspections were performed on Tanks 25, 26 and 34 and the findings are documented in SRNL-STI-2011-00495, Tank Inspection NDE Results for Fiscal Year 2011, Waste Tanks 25, 26, 34 and 41. A total of 5813 photographs were made and 835 visual and video inspections were performed during 2011. A potential leaksite was discovered at Tank 4 during routine annual inspections performed in 2011. The new crack, which is above the allowable fill level, resulted in no release to the environment or tank annulus. The location of the crack is documented in C-ESR-G-00003, SRS High Level Waste Tank Leaksite Information, Rev.6.

  3. 40 CFR 725.75 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Inspections. 725.75 Section 725.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative Procedures § 725.75 Inspections. EPA...

  4. 40 CFR 725.75 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false Inspections. 725.75 Section 725.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative Procedures § 725.75 Inspections. EPA...

  5. 40 CFR 725.75 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Inspections. 725.75 Section 725.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative Procedures § 725.75 Inspections. EPA...

  6. 40 CFR 725.75 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false Inspections. 725.75 Section 725.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative Procedures § 725.75 Inspections. EPA...

  7. 40 CFR 725.75 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false Inspections. 725.75 Section 725.75 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT REPORTING REQUIREMENTS AND REVIEW PROCESSES FOR MICROORGANISMS Administrative Procedures § 725.75 Inspections. EPA...

  8. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized...

  9. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized...

  10. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized...

  11. 30 CFR 27.30 - Inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Inspection. 27.30 Section 27.30 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.30 Inspection. A detailed...

  12. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized...

  13. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized...

  14. 30 CFR 27.30 - Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Inspection. 27.30 Section 27.30 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.30 Inspection. A detailed...

  15. 14 CFR 121.1109 - Supplemental inspections.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... damage-tolerance-based inspections and procedures for airplane structure susceptible to fatigue cracking... termed “fatigue critical structure.” (2) Adverse effects of repairs, alterations, and modifications. The..., and modifications may have on fatigue critical structure and on inspections required by paragraph...

  16. 14 CFR 121.1109 - Supplemental inspections.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... damage-tolerance-based inspections and procedures for airplane structure susceptible to fatigue cracking... termed “fatigue critical structure.” (2) Adverse effects of repairs, alterations, and modifications. The..., and modifications may have on fatigue critical structure and on inspections required by paragraph...

  17. 14 CFR 121.1109 - Supplemental inspections.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... damage-tolerance-based inspections and procedures for airplane structure susceptible to fatigue cracking... termed “fatigue critical structure.” (2) Adverse effects of repairs, alterations, and modifications. The..., and modifications may have on fatigue critical structure and on inspections required by paragraph...

  18. 14 CFR 121.1109 - Supplemental inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... damage-tolerance-based inspections and procedures for airplane structure susceptible to fatigue cracking... termed “fatigue critical structure.” (2) Adverse effects of repairs, alterations, and modifications. The..., and modifications may have on fatigue critical structure and on inspections required by paragraph...

  19. 14 CFR 121.1109 - Supplemental inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... damage-tolerance-based inspections and procedures for airplane structure susceptible to fatigue cracking... termed “fatigue critical structure.” (2) Adverse effects of repairs, alterations, and modifications. The..., and modifications may have on fatigue critical structure and on inspections required by paragraph...

  20. System Enhancements for Mechanical Inspection Processes

    NASA Technical Reports Server (NTRS)

    Hawkins, Myers IV

    2011-01-01

    Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

  1. Coordinated ionospheric and magnetospheric observations from the ISIS 2 satellite by the ISIS 2 experimenters. Volume 2: Auroral optical emissions magnetic field perturbations, and plasma characteristics, measured simultaneously on the same magnetic field line

    NASA Technical Reports Server (NTRS)

    Shepherd, G. G.

    1980-01-01

    The data set consists of a selected number of passes, each comprising a format combination that is most appropriate for the particular data set. A list of ISIS 2 experimenters, with addresses and telephone numbers is included. A brief description of the ISIS 2 satellite is given, followed by more detailed instrument descriptions, format descriptions, data set descriptions, and the data themselves.

  2. Steam generator tube inspection in Japan

    SciTech Connect

    Fukui, Shigetaka

    1997-02-01

    Steam generator tube inspection was first carried out in 1971 at Mihama Unit-1 that is first PWR plant in Japan, when the plant was brought into the first annual inspection. At that time, inspection was made on sampling basis, and only bobbin coil probe was used. After experiencing various kinds of tube degradations, inspection method was changed from sampling to all number of tubes, and various kinds of probes were used to get higher detectability of flaw. At present, it is required that all the tubes shall be inspected in their full length at each annual inspection using standard bobbin coil probe, and some special probes for certain plants that have susceptibility of occurrence of flaw. Sleeve repaired portion is included in this inspection. As a result of analyses of eddy current testing data, all indications that have been evaluated to be 20% wall thickness or deeper shall be repaired by either plugging or sleeving, where flaw morphology is to be a wastage or wear. Other types of flaw such as IGA/SCC are not allowed to be left inservice when those indications are detected. These inspections are performed according to inspection procedures that are approved by regulatory authority. Actual inspections are witnessed by the Japan Power engineering and inspection corporation (JAPEIC)`s inspectors during data acquisition and analysis, and they issue inspection report to authority for review and approval. It is achieved high safety performance of steam generator through this method of inspections, however. some tube leakage problems were experienced in the past. To prevent recurrence of such events, government is conducting development and verification test program for new eddy current testing technology.

  3. ROBOTIC TANK INSPECTION END EFFECTOR

    SciTech Connect

    Rachel Landry

    1999-10-01

    The objective of this contract between Oceaneering Space Systems (OSS) and the Department of Energy (DOE) was to provide a tool for the DOE to inspect the inside tank walls of underground radioactive waste storage tanks in their tank farms. Some of these tanks are suspected to have leaks, but the harsh nature of the environment within the tanks precludes human inspection of tank walls. As a result of these conditions only a few inspection methods can fulfill this task. Of the methods available, OSS chose to pursue Alternating Current Field Measurement (ACFM), because it does not require clean surfaces for inspection, nor any contact with the Surface being inspected, and introduces no extra by-products in the inspection process (no coupling fluids or residues are left behind). The tool produced by OSS is the Robotic Tank Inspection End Effector (RTIEE), which is initially deployed on the tip of the Light Duty Utility Arm (LDUA). The RTEE combines ACFM with a color video camera for both electromagnetic and visual inspection The complete package consists of an end effector, its corresponding electronics and software, and a user's manual to guide the operator through an inspection. The system has both coarse and fine inspection modes and allows the user to catalog defects and suspected areas of leakage in a database for further examination, which may lead to emptying the tank for repair, decommissioning, etc.. The following is an updated report to OSS document OSS-21100-7002, which was submitted in 1995. During the course of the contract, two related subtasks arose, the Wall and Coating Thickness Sensor and the Vacuum Scarifying and Sampling Tool Assembly. The first of these subtasks was intended to evaluate the corrosion and wall thinning of 55-gallon steel drums. The second was retrieved and characterized the waste material trapped inside the annulus region of the underground tanks on the DOE's tank farms. While these subtasks were derived from the original intent of

  4. A Dynamic Approach to Make CDS/ISIS Databases Interoperable over the Internet Using the OAI Protocol

    ERIC Educational Resources Information Center

    Jayakanth, F.; Maly, K.; Zubair, M.; Aswath, L.

    2006-01-01

    Purpose: A dynamic approach to making legacy databases, like CDS/ISIS, interoperable with OAI-compliant digital libraries (DLs). Design/methodology/approach: There are many bibliographic databases that are being maintained using legacy database systems. CDS/ISIS is one such legacy database system. It was designed and developed specifically for…

  5. Safeguards management inspection procedures

    SciTech Connect

    Barth, M.J.; Dunn, D.R.

    1984-08-01

    The objective of this inspection module is to independently assess the contributions of licensee management to overall safeguards systems performance. The inspector accomplishes this objective by comparing the licensee's safeguards management to both the 10 CFR, parts 70 and 73, requirements and to generally accepted management practices. The vehicle by which this comparison is to be made consists of assessment questions and key issues which point the inspector to areas of primary concern to the NRC and which raise additional issues for the purpose of exposing management ineffectiveness. Further insight into management effectiveness is obtained through those assessment questions specifically directed toward the licensee's safeguards system performance. If the quality of the safeguards is poor, then the inspector should strongly suspect that management's role is ineffective and should attempt to determine management's influence (or lack thereof) on the underlying safeguards deficiencies. (The converse is not necessarily true, however.) The assessment questions in essence provide an opportunity for the inspector to identify, to single out, and to probe further, questionable management practices. Specific issues, circumstances, and concerns which point to questionable or inappropriate practices should be explicitly identified and referenced against the CFR and the assessment questions. The inspection report should also explain why the inspector feels certain management practices are poor, counter to the CFR, and/or point to ineffecive management. Concurrent with documenting the inspection results, the inspector should provide recommendations for alleviating observed management practices that are detrimental to effective safeguards. The recommendations could include: specific changes in the practices of the licensee, followup procedures on the part of NRC, and proposed license changes.

  6. Laser Safety Inspection Criteria

    SciTech Connect

    Barat, K

    2005-06-13

    A responsibility of the Laser Safety Officer (LSO) is to perform laser audits. The American National Standard Z136.1 Safe Use of Lasers references this requirement through several sections. One such reference is Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''. The composition, frequency and rigor of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms It is common for audit findings from one inspector or inspection to the next to vary even when reviewing the same material. How often has one heard a comment, ''well this area has been inspected several times over the years and no one ever said this or that was a problem before''. A great number of audit items, and therefore findings, are subjective because they are based on the experience and interest of the auditor to particular items on the checklist. Beam block usage, to one set of eyes might be completely adequate, while to another, inadequate. In order to provide consistency, the Laser Safety Office of the National Ignition Facility Directorate has established criteria for a number of items found on the typical laser safety audit form. The criteria are distributed to laser users. It serves two broad purposes; first, it gives the user an expectation of what will be reviewed by an auditor. Second, it is an opportunity to explain audit items to the laser user and thus the reasons for some of these items, such as labelling of beam blocks.

  7. Some Critical Remarks on the Stop Word Lists of ISI Publications.

    ERIC Educational Resources Information Center

    Tomov, D. T.

    2001-01-01

    A semantic analysis of the "Weekly Subject Index Stop Word List" of "Current Contents" of the Institute for Scientific Information (ISI) and the full-stop word and semi-stop word lists of the Permuterm Subject Index of "Science Citation Index" was conducted. Emphasizes the necessity of an improved, semantically-oriented policy in preparing lists…

  8. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.

  9. ISI's Impact Factor as Misnomer: A Proposed New Measure To Assess Journal Impact.

    ERIC Educational Resources Information Center

    Harter, Stephen P.; Nisonger, Thomas E.

    1997-01-01

    Discusses "impact factor," a measure of journal impact defined by the Institute of Scientific Information (ISI) and available in Journal Citation Reports. Argues that "impact factor" is misnamed and misused, suggesting an alternative name and interpretation of the measure, and proposes two new measures to assess the impact of…

  10. The ISI Classroom Observation System: Examining the Literacy Instruction Provided to Individual Students

    ERIC Educational Resources Information Center

    Connor, Carol McDonald; Morrison, Frederick J.; Fishman, Barry J.; Ponitz, Claire Cameron; Glasney, Stephanie; Underwood, Phyllis S.; Piasta, Shayne B.; Crowe, Elizabeth Coyne; Schatschneider, Christopher

    2009-01-01

    The Individualizing Student Instruction (ISI) classroom observation and coding system is designed to provide a detailed picture of the classroom environment at the level of the individual student. Using a multidimensional conceptualization of the classroom environment, foundational elements (teacher warmth and responsiveness to students, classroom…

  11. Development of the Indicators of Successful Inclusion Scale (ISIS): Addressing Ecological Concerns

    ERIC Educational Resources Information Center

    Brandes, Joyce A.; McWhirter, Paula T.; Haring, Kathryn A.; Crowson, Michael H.; Millsap, Clay A.

    2012-01-01

    The Indicators of Successful Inclusion Scale (ISIS) was developed to measure pre-service and practicing educators' beliefs regarding factors that contribute to educating students with disabilities in general education classrooms. The measure was designed to assess teachers' beliefs and attitudes related to inclusive education and to consider their…

  12. A Client-Server Approach To DCE Inter-Operability the Cronus/ISIS Project (Crisis),

    DTIC Science & Technology

    1995-03-01

    Distributed computing environments (DCEs)support several key attributes that are essential for the development and execution of Command and Control...DCEs (Cronus and Isis). The rationale for doing this was to utilize the strengths of each distributed computing environment, where a certain DCEs design methodology is better suited for that part of the application.

  13. Precluding nonlinear ISI in direct detection long-haul fiber optic systems

    NASA Technical Reports Server (NTRS)

    Swenson, Norman L.; Shoop, Barry L.; Cioffi, John M.

    1991-01-01

    Long-distance, high-rate fiber optic systems employing directly modulated 1.55-micron single-mode lasers and conventional single-mode fiber suffer severe intersymbol interference (ISI) with a large nonlinear component. A method of reducing the nonlinearity of the ISI, thereby making linear equalization more viable, is investigated. It is shown that the degree of nonlinearity is highly dependent on the choice of laser bias current, and that in some cases the ISI nonlinearity can be significantly reduced by biasing the laser substantially above threshold. Simulation results predict that an increase in signal-to-nonlinear-distortion ratio as high as 25 dB can be achieved for synchronously spaced samples at an optimal sampling phase by increasing the bias current from 1.2 times threshold to 3.5 times threshold. The high SDR indicates that a linear tapped delay line equalizer could be used to mitigate ISI. Furthermore, the shape of the pulse response suggests that partial response precoding and digital feedback equalization would be particularly effective for this channel.

  14. Making up the "Ummah": The Rhetoric of ISIS as Public Pedagogy

    ERIC Educational Resources Information Center

    Low, Remy

    2016-01-01

    In this article, the author submits that the push for moderation and social cohesion through deradicalization is an inadequate response to violence inspired by the Islamic State in Iraq and Syria (ISIS) because it elides the political disaffections to which the group speaks. In advancing this argument, the author suggests that the rhetoric of ISIS…

  15. Data Services Upgrade: Perfecting the ISIS-I Topside Digital Ionogram Database

    NASA Technical Reports Server (NTRS)

    Wang, Yongli; Benson, Robert F.; Bilitza, Dieter; Fung, Shing. F.; Chu, Philip; Huang, Xueqin; Truhlik, Vladimir

    2015-01-01

    The ionospheric topside sounders of the International Satellites for Ionospheric Studies (ISIS) program were designed as analog systems. More than 16,000 of the original telemetry tapes from three satellites were used to produce topside digital ionograms, via an analog-to-digital (A/D) conversion process, suitable for modern analysis techniques. Unfortunately, many of the resulting digital topside ionogram files could not be auto-processed to produce topside Ne(h) profiles because of problems encountered during the A/D process. Software has been written to resolve these problems and here we report on (1) the first application of this software to a significant portion of the ISIS-1 digital topside-ionogram database, (2) software improvements motivated by this activity, (3) N(sub e)(h) profiles automatically produced from these corrected ISIS-1 digital ionogram files, and (4) the availability via the Virtual Wave Observatory (VWO) of the corrected ISIS-1 digital topside ionogram files for research. We will also demonstrate the use of these N(sub e)(h) profiles for making refinements in the International Reference Ionosphere (IRI) and in the determination of transition heights from Oxygen ion to Hydrogen ion.

  16. Electronic Inspection of Beef

    NASA Technical Reports Server (NTRS)

    Anselmo, Victor J.; Gammell, Paul M.; Clark, Jerry

    1987-01-01

    Two proposed methods for grading beef quality based on inspection by electronic equipment: one method uses television camera to generate image of a cut of beef as customer sees it; other uses ultrasonics to inspect live animal or unsliced carcasses. Both methods show promise for automated meat inspection.

  17. 30 CFR 842.11 - Federal inspections and monitoring.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (v) With regard to abandoned sites as defined in § 840.11(g) of this chapter, the State regulatory... inspection is an on-site or aerial review of a person's compliance with some of the permit requirements and... reclamation site inspected. (B) Any potential violation observed during an aerial inspection shall...

  18. 30 CFR 842.11 - Federal inspections and monitoring.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (v) With regard to abandoned sites as defined in § 840.11(g) of this chapter, the State regulatory... inspection is an on-site or aerial review of a person's compliance with some of the permit requirements and... reclamation site inspected. (B) Any potential violation observed during an aerial inspection shall...

  19. 9 CFR 500.6 - Withdrawal of inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) or § 381.94(a) of this chapter; (f) An establishment did not comply with the Salmonella performance... REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT RULES OF PRACTICE § 500.6 Withdrawal of inspection. The FSIS Administrator may file a complaint to...

  20. 9 CFR 500.6 - Withdrawal of inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) or § 381.94(a) of this chapter; (f) An establishment did not comply with the Salmonella performance... REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT RULES OF PRACTICE § 500.6 Withdrawal of inspection. The FSIS Administrator may file a complaint to...

  1. 9 CFR 500.6 - Withdrawal of inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) or § 381.94(a) of this chapter; (f) An establishment did not comply with the Salmonella performance... REGULATORY REQUIREMENTS UNDER THE FEDERAL MEAT INSPECTION ACT AND THE POULTRY PRODUCTS INSPECTION ACT RULES OF PRACTICE § 500.6 Withdrawal of inspection. The FSIS Administrator may file a complaint to...

  2. 49 CFR 238.107 - Inspection, testing, and maintenance plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Inspection, testing, and maintenance plan. 238.107... Requirements § 238.107 Inspection, testing, and maintenance plan. (a) General. Beginning on January 1, 2002... develop, and provide to FRA upon request, a detailed inspection, testing, and maintenance plan...

  3. 49 CFR 192.287 - Plastic pipe: Inspection of joints.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Plastic pipe: Inspection of joints. 192.287... Than by Welding § 192.287 Plastic pipe: Inspection of joints. No person may carry out the inspection of joints in plastic pipes required by §§ 192.273(c) and 192.285(b) unless that person has been qualified...

  4. 49 CFR 192.287 - Plastic pipe: Inspection of joints.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Plastic pipe: Inspection of joints. 192.287... Than by Welding § 192.287 Plastic pipe: Inspection of joints. No person may carry out the inspection of joints in plastic pipes required by §§ 192.273(c) and 192.285(b) unless that person has been qualified...

  5. 49 CFR 192.287 - Plastic pipe: Inspection of joints.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Plastic pipe: Inspection of joints. 192.287... Than by Welding § 192.287 Plastic pipe: Inspection of joints. No person may carry out the inspection of joints in plastic pipes required by §§ 192.273(c) and 192.285(b) unless that person has been qualified...

  6. 49 CFR 192.287 - Plastic pipe: Inspection of joints.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Plastic pipe: Inspection of joints. 192.287... Than by Welding § 192.287 Plastic pipe: Inspection of joints. No person may carry out the inspection of joints in plastic pipes required by §§ 192.273(c) and 192.285(b) unless that person has been qualified...

  7. 49 CFR 192.287 - Plastic pipe: Inspection of joints.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Plastic pipe: Inspection of joints. 192.287... Than by Welding § 192.287 Plastic pipe: Inspection of joints. No person may carry out the inspection of joints in plastic pipes required by §§ 192.273(c) and 192.285(b) unless that person has been qualified...

  8. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy the requirements for basic and enhanced motor vehicle inspection and maintenance (I/M) in applicable ozone... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Inspection and maintenance program....

  9. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy the requirements for basic and enhanced motor vehicle inspection and maintenance (I/M) in applicable ozone... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Inspection and maintenance program....

  10. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy the requirements for basic and enhanced motor vehicle inspection and maintenance (I/M) in applicable ozone... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Inspection and maintenance program....

  11. 40 CFR 52.241 - Inspection and maintenance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... California Motor Vehicle Inspection and Maintenance Program (2009 I/M Revision) to satisfy the requirements for basic and enhanced motor vehicle inspection and maintenance (I/M) in applicable ozone... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Inspection and maintenance program....

  12. An analysis of defect densities found during software inspections

    NASA Technical Reports Server (NTRS)

    Kelly, John C.; Sherif, Joseph S.; Hops, Jonathan

    1990-01-01

    Software inspection is a technical evaluation process for finding and removing defects in requirements, design, code, and tests. Detailed data was collected during the first three years of experience at JPL on 203 inspections. Statistics are discussed for this set of inspections. Included, on a per inspection basis, are averages of: staff time expended, pages covered, major defects found, minor defects found, and inspection team size. Analysis of variance showed a significantly higher density of defects during requirements inspections. It was also observed, that the defect densities found decreased exponentially as the work products approached the coding phase. Increasing the pace of the inspection meeting decreased the density of defects found. This relationship was observed to hold for both major and minor defect densities, although it was more pronounced for minor defects. Guidelines are provided for conducting successful software inspections based upon three years of JPL experience.

  13. Method prevents secondary radiation in radiographic inspection

    NASA Technical Reports Server (NTRS)

    Struckus, A. A.

    1967-01-01

    Thin-walled neoprene containers prevent secondary radiation, scatter, and undercut during radiographic inspection. The containers are filled with a mixture of barium sulfate, red lead, and petroleum jelly that achieves the required absorption rate.

  14. 49 CFR 213.369 - Inspection records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system be designed such that the integrity of each record maintained through appropriate levels of... subsequent inspections. (f) Each vehicle/track interaction safety record required under § 213.333 (g), and...

  15. Process Specification for Eddy Current Inspection

    NASA Technical Reports Server (NTRS)

    Koshti, Ajay

    2011-01-01

    This process specification establishes the minimum requirements for eddy current inspection of flat surfaces, fastener holes, threaded fasteners and seamless and welded tubular products made from nonmagnetic alloys such as aluminum and stainless steel.

  16. Postgraduate Students' Experiences and Attitudes Towards isiZulu as a Medium of Instruction at the University of KwaZulu-Natal

    ERIC Educational Resources Information Center

    Nkosi, Zinhle Primrose

    2014-01-01

    IsiZulu is one of the 11 official languages of South Africa and has the highest number of speakers in the country. While the South African Language Policy for Higher Education (2002) emphasizes the need to use African languages at universities, not many universities' isiZulu-speaking students prefer to be taught in isiZulu. Research has revealed…

  17. Climbing techniques for bridge inspection

    NASA Astrophysics Data System (ADS)

    Kaslan, Erol C.

    1998-03-01

    California has about 24,000 publicly owned bridges that require routine structural evaluations to comply with National Bridge Inspection Standard (NBIS) mandates. Of these, about 800 are identified as possessing fatigue prone or fracture critical details requiring thorough tactile investigations. Gaining access to bridge elements to perform these investigations has become increasingly difficult and costly. The traditional uses of under bridge inspection trucks, lift equipment and rigging are economically and practically limited by bridge size, structure type, traffic demands and support costs. In some cases, bridges that have become damaged by earthquakes cannot safely support the loads of heavy personnel lift equipment. The California Department of Transportation (Caltrans)'s Office of Structural Materials and Office of Structure Maintenance and Investigations evaluated the use of rock climbing and mountaineering techniques as an alternative means of gaining access for bridge inspections. Under a small research grant, a bridge climbing training course was developed through a local University of California outdoor recreation group and 7 engineers and technicians were initially trained. A comprehensive Code of Safe Practices was created and standards of training, procedures and equipment required for bridge inspections were established. A successful climb investigation on a large, previously inaccessible arch bridge was completed at the end of the training that proved the techniques safe, economical and effective. Within one year, 20 bridge maintenance engineers were trained, and a formal program was established to organize, schedule, equip and certify engineers and technicians for bridge climbing. Several other offices within Caltrans as well as the California Department of Water Resources have since adopted these techniques for specialized structural inspection tasks. Climbing techniques are now used routinely in California as an alterative means of gaining access

  18. Laser Safety Inspection Criteria

    SciTech Connect

    Barat, K

    2005-02-11

    A responsibility of the Laser Safety Officer (LSO) is to perform laser safety audits. The American National Standard Z136.1 Safe use of Lasers references this requirement in several sections: (1) Section 1.3.2 LSO Specific Responsibilities states under Hazard Evaluation, ''The LSO shall be responsible for hazards evaluation of laser work areas''; (2) Section 1.3.2.8, Safety Features Audits, ''The LSO shall ensure that the safety features of the laser installation facilities and laser equipment are audited periodically to assure proper operation''; and (3) Appendix D, under Survey and Inspections, it states, ''the LSO will survey by inspection, as considered necessary, all areas where laser equipment is used''. Therefore, for facilities using Class 3B and or Class 4 lasers, audits for laser safety compliance are expected to be conducted. The composition, frequency and rigueur of that inspection/audit rests in the hands of the LSO. A common practice for institutions is to develop laser audit checklists or survey forms. In many institutions, a sole Laser Safety Officer (LSO) or a number of Deputy LSO's perform these audits. For that matter, there are institutions that request users to perform a self-assessment audit. Many items on the common audit list and the associated findings are subjective because they are based on the experience and interest of the LSO or auditor in particular items on the checklist. Beam block usage is an example; to one set of eyes a particular arrangement might be completely adequate, while to another the installation may be inadequate. In order to provide more consistency, the National Ignition Facility Directorate at Lawrence Livermore National Laboratory (NIF-LLNL) has established criteria for a number of items found on the typical laser safety audit form. These criteria are distributed to laser users, and they serve two broad purposes: first, it gives the user an expectation of what will be reviewed by an auditor, and second, it is an

  19. John Day Dam - Underwater video inspection

    SciTech Connect

    Vaughn, R.A.

    1995-12-31

    An underwater video inspection device has recently been designed and built for use at John Day Powerhouse on the Columbia River. It is used to inspect for damage on the submerged traveling screens, vertical barrier screens and orifices which are used to guide juvenile fish away from the turbines. The Corps of Engineers is legally required to inspect this equipment once per month. It is possible but time consuming to perform the inspections on submerged traveling screens by removing them. The removal of screens requires a six person crew and gantry crane. The time to remove and install a screen is about 3 hours. A typical plant such as John Day has 48 screens. On most power plants, it is not practical to remove the vertical barrier screens because it is so time consuming. These were formerly inspected by shutting down the generating units and using a camera on a tether to inspect. The new inspection device uses minimal crew and doesn`t require shutting down generating units. This system is intended to be a prototype and it is expected that some improvements to the system will be developed as the system is used.

  20. Nuclear Technology. Course 30: Mechanical Inspection. Module 30-3, Valve Inspection.

    ERIC Educational Resources Information Center

    Wasil, Ed; Espy, John

    This third in a series of eight modules for a course titled Mechanical Inspection describes all the major types of valves utilized in a nuclear power plant and the purposes of the preinstallation and installation inspections; also describes the valve testing required for particular valves. The module follows a typical format that includes the…