Sample records for install provide operator

  1. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less

  2. 24 CFR 3285.1 - Administration.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...

  3. 24 CFR 3285.1 - Administration.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...

  4. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  5. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  6. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  7. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  8. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  9. Global Positioning System: A Guide for the Approval of GPS Receiver Installation and Operation

    DOT National Transportation Integrated Search

    1996-10-01

    This guide is designed to assist Federal Aviation Adalnlatratlon (FAA) Aviation Safety : Inspectors (ASIs) in evaluating new Global Positioning Systena (GPS) installations and : operations. Because there aro aany documents providing Information, regu...

  10. New concept for a general purpose subsea installation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less

  11. 47 CFR 80.1083 - Ship radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Ship radio installations. 80.1083 Section 80... for Ship Stations § 80.1083 Ship radio installations. (a) Ships must be provided with radio... controls for operating the radio installation; and (5) Be clearly marked with the call sign, the ship...

  12. 40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... an existing affected source, you may install, operate, and maintain a bag leak detection system for.... If you own or operate a new affected source, you must install, operate, and maintain a bag leak... foot) or less. (ii) The bag leak detection system sensor must provide output of relative PM loadings...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  14. Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.

  15. International Space Station United States Orbital Segment Oxygen Generation System On-Orbit Operational Experience

    NASA Technical Reports Server (NTRS)

    Erickson, Robert J.; Howe, John, Jr.; Kulp, Galen W.; VanKeuren, Steven P.

    2008-01-01

    The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) was originally intended to be installed in ISS Node 3. The OGS rack delivery was accelerated, and it was launched to ISS in July of 2006 and installed in the US Laboratory Module. Various modification kits were installed to provide its interfaces, and the OGS was first activated in July of 2007 for 15 hours, In October of 2007 it was again activated for 76 hours with varied production rates and day/night cycling. Operational time in each instance was limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Feedwater will be provided by PWR bag until the USOS Water Recovery System (WRS) is delivered to SS in fall of 2008. This paper will discuss operating experience and characteristics of the OGS, as well as operational issues and their resolution.

  16. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  17. Lessons learned from hybrid wind/PV village power system installations in Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergey, M.

    1995-09-01

    In the last three years eight decentralized village power systems utilizing small wind turbines as the primary energy source have been installed in rural Mexico. Hybrid wind/PV systems have been installed in five States and by three vendors. Seven out of the eight systems, which range i size from 9.3--71.2kW in combined wind and PV capacity, utilize one or more 10 kW wind turbines. All of these installations have battery banks and use static inverters to provide AC power for distribution to homes, businesses, and community facilities. On all but one of the systems a diesel generator is used tomore » provide back-up power. This paper attempts to summarize the range of costs and economics, performance, and operational experiences for all eight installations. Several of the systems are monitored for performance, including one that is extensively monitored under a cooperative program between the Instituto de Investigaciones Electricas and Sandia National Laboratory. Lessons learned from these systems provide insights that may allow future village power systems of this architecture to be installed at lower costs, to be operated more effectively and efficiently, and to be better able to satisfy customer requirements.« less

  18. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkerson, Andrea M.; Davis, Robert G.

    The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpectedmore » delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.« less

  20. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... However, both may be connected to the main power supply provided one installation can be operated from a separate power supply located as high as practicable on the vessel. (c) This paragraph does not require or...

  1. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... However, both may be connected to the main power supply provided one installation can be operated from a separate power supply located as high as practicable on the vessel. (c) This paragraph does not require or...

  2. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  3. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  4. 40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... make sure the installed engine will operate according to design specifications in your application for... post instructions on a publicly available website for downloading or printing. If you do not provide...

  5. 40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... make sure the installed engine will operate according to design specifications in your application for... post instructions on a publicly available website for downloading or printing. If you do not provide...

  6. 40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... make sure the installed engine will operate according to design specifications in your application for... post instructions on a publicly available website for downloading or printing. If you do not provide...

  7. 40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... make sure the installed engine will operate according to design specifications in your application for... post instructions on a publicly available website for downloading or printing. If you do not provide...

  8. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less

  9. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Specifications for the Design... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for... Coast Guard for clarity. 1Purpose The purpose of these Specifications is to provide specific design...

  10. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  11. Crime Prevention in Schools: Specification, Installation, and Maintenance of Intruder Alarm Systems. Building Bulletin 69.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…

  12. Eliminating Bias

    EPA Pesticide Factsheets

    Learn how to eliminate bias from monitoring systems by instituting appropriate installation, operation, and quality assurance procedures. Provides links to download An Operator's Guide to Eliminating Bias in CEM Systems.

  13. Installation of Computerized Procedure System and Advanced Alarm System in the Human Systems Simulation Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya Lee; Spielman, Zachary Alexander; Rice, Brandon Charles

    2016-04-01

    This report describes the installation of two advanced control room technologies, an advanced alarm system and a computerized procedure system, into the Human Systems Simulation Laboratory (HSSL). Installation of these technologies enables future phases of this research by providing a platform to systematically evaluate the effect of these technologies on operator and plant performance.

  14. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  15. Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, P.A.

    1996-11-01

    The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.

  16. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  17. Force Balance Determination of a Film Riding Seal Using CFD

    NASA Technical Reports Server (NTRS)

    Justak, John

    2007-01-01

    CFD analysis provides a means of discerning H-seal functionality. H-Seal geometry can be modified to provide smaller or larger operational gap. H-Seal can be installed with large cold clearance and maintain a small operational effective clearance.

  18. Power system interface and umbilical system study

    NASA Technical Reports Server (NTRS)

    1980-01-01

    System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.

  19. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  20. Installation package for a solar heating and hot water system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  1. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  2. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  3. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  4. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  5. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  6. Flate-plate photovoltaic power systems handbook for Federal agencies

    NASA Technical Reports Server (NTRS)

    Cochrane, E. H.; Lawson, A. C.; Savage, C. H.

    1984-01-01

    The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.

  7. Shipboard CCTV for Globe-Girdling Students.

    ERIC Educational Resources Information Center

    Anderton, Ray L.

    1983-01-01

    Describes installation, operation, and educational benefits of a closed circuit television system installed on a ship used for the "Semester at Sea" program. The program, jointly sponsored by the University of Pittsburgh and the Institute of Shipboard Education, provides undergraduates with the opportunity to pursue studies on a…

  8. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  9. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  10. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  11. 49 CFR 386.83 - Sanction for failure to pay civil penalties or abide by payment plan; operation in interstate...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... commerce prohibited. (a)(1) General rule. (i) A CMV owner or operator that fails to pay a civil penalty in... FMCSA Service Center may allow a CMV owner or operator, or an intermodal equipment provider, to pay a civil penalty in installments. If the CMV owner or operator, or intermodal equipment provider, fails to...

  12. A feasibility assessment of installation, operation and disposal options for nuclear reactor power system concepts for a NASA growth space station

    NASA Technical Reports Server (NTRS)

    Bloomfield, Harvey S.; Heller, Jack A.

    1987-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.

  13. 47 CFR 80.913 - Radiotelephone receivers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... pursuant to § 80.909 of this part. (c) If a very high frequency radiotelephone installation is provided... radiotelephone installation must have a sensitivity of at least 50 microvolts in the case of MF equipment, and 1... be capable of efficient operation when energized by the reserve source of energy. (g) The sensitivity...

  14. 47 CFR 80.913 - Radiotelephone receivers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... pursuant to § 80.909 of this part. (c) If a very high frequency radiotelephone installation is provided... radiotelephone installation must have a sensitivity of at least 50 microvolts in the case of MF equipment, and 1... be capable of efficient operation when energized by the reserve source of energy. (g) The sensitivity...

  15. 47 CFR 80.913 - Radiotelephone receivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... pursuant to § 80.909 of this part. (c) If a very high frequency radiotelephone installation is provided... radiotelephone installation must have a sensitivity of at least 50 microvolts in the case of MF equipment, and 1... be capable of efficient operation when energized by the reserve source of energy. (g) The sensitivity...

  16. 47 CFR 80.913 - Radiotelephone receivers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... pursuant to § 80.909 of this part. (c) If a very high frequency radiotelephone installation is provided... radiotelephone installation must have a sensitivity of at least 50 microvolts in the case of MF equipment, and 1... be capable of efficient operation when energized by the reserve source of energy. (g) The sensitivity...

  17. 47 CFR 80.913 - Radiotelephone receivers.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... pursuant to § 80.909 of this part. (c) If a very high frequency radiotelephone installation is provided... radiotelephone installation must have a sensitivity of at least 50 microvolts in the case of MF equipment, and 1... be capable of efficient operation when energized by the reserve source of energy. (g) The sensitivity...

  18. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  19. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  20. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  1. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  2. 40 CFR 51.160 - Legally enforceable procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility, building, structure or installation, or combination of these will result in— (1) A violation of... provide for the submission, by the owner or operator of the building, facility, structure, or installation to be constructed or modified, of such information on— (1) The nature and amounts of emissions to be...

  3. The accuracy of coin-operated breath analysers installed in licensed premises in the Perth metropolitan area.

    PubMed

    Hay, Greg; Cercarelli, L Rina

    2004-04-01

    To examine the accuracy of coin-operated breath analysers installed in licensed premises in the Perth metropolitan area. Two hundred licensed premises were contacted, which resulted in the location of 36 wall-mounted, coin-operated breath analysers. One instrument was removed prior to testing. These premises were then visited and the accuracy of the instruments was tested in situ using National Association of Testing Authorities Australia (NATA) certified 0.080% and 0.100% ethanol in nitrogen gas. The instruments were installed in the licensed premises as follows: 15 in the lounge bar, 10 in the main entrance, six in the public bar, two in the passageway to the toilets, and one in the male toilets. One licensed premise provided a handheld breath instrument. All instruments were accompanied by warning and operating instructions, but only five had any educational material. Only seven of the licensed premises had staff who had received any training in the operation of the wall-mounted instruments. Half of the licensees were unaware of the servicing requirements of the instruments. The testing found that only nine (25%) of the instruments provided acceptable results. The low level of accuracy of coin-operated breath analysers in the Perth metropolitan area is alarming and users should be informed of the potential inaccuracies. This paper, however, does not rule out that some wall-mounted breath analysing instruments may provide accurate results when properly maintained.

  4. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  5. Solar hot water space heating system. Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dam, T

    1979-08-13

    A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)

  6. Fuel cells: A survey

    NASA Technical Reports Server (NTRS)

    Crowe, B. J.

    1973-01-01

    A survey of fuel cell technology and applications is presented. The operating principles, performance capabilities, and limitations of fuel cells are discussed. Diagrams of fuel cell construction and operating characteristics are provided. Photographs of typical installations are included.

  7. 14 CFR 23.1335 - Flight director systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Flight director systems. 23.1335 Section 23...: Installation § 23.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the flight crew its current mode of operation. Selector switch position is not...

  8. 14 CFR 23.1335 - Flight director systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Flight director systems. 23.1335 Section 23...: Installation § 23.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the flight crew its current mode of operation. Selector switch position is not...

  9. V/STOL aircraft and method

    DOEpatents

    Owens, Phillip R.

    1997-01-01

    Aircraft apparatus and method capable of V/STOL (vertical, short takeoff and landing) in addition to conventional flight. For V/STOL operation, induced lift is provided by blowing air over the upper surface of each wing through a duct installed near the leading edge. Intake air is supplied to the blowing fan through a duct installed near the trailing edge, thus providing suction as well as blowing. Two fans in series are required. The engine provides power not only to the propeller but also to a transmission which provides power to the pulleys driving the belt-driven fans.

  10. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  11. First-order aerodynamic and aeroelastic behavior of a single-blade installation setup

    NASA Astrophysics Data System (ADS)

    Gaunaa, M.; Bergami, L.; Guntur, S.; Zahle, F.

    2014-06-01

    Limitations on the wind speed at which blade installation can be performed bears important financial consequences. The installation cost of a wind farm could be significantly reduced by increasing the wind speed at which blade mounting operations can be carried out. This work characterizes the first-order aerodynamic and aeroelastic behavior of a single blade installation system, where the blade is grabbed by a yoke, which is lifted by the crane and stabilized by two taglines. A simple engineering model is formulated to describe the aerodynamic forcing on the blade subject to turbulent wind of arbitrary direction. The model is coupled with a schematic aeroelastic representation of the taglines system, which returns the minimum line tension required to compensate for the aerodynamic forcing. The simplified models are in excellent agreement with the aeroelastic code HAWC2, and provide a solid basis for future design of an upgraded single blade installation system able to operate at higher wind speeds.

  12. Fixed Route Comprehensive Operational Analysis, 1994 Operating Year. Fourth Installment Route 3: Mill Ridge/Mill Plain Analysis

    DOT National Transportation Integrated Search

    1995-05-01

    In October, of 1992, the Housatonic Area Regional Transit (HART) District published a planning study providing an in-depth analysis of its fixed route bus transit service. This comprehensive operational analysis (COA) was the first detailed analysis ...

  13. Fixed Route Comprehensive Operational Analysis, 1994 Operating Year. First Installment, Route 1: Medical Center/Golden Hill Analysis

    DOT National Transportation Integrated Search

    1994-07-01

    In October, of 1992, the Housatonic Area Regional Transit (HART) District published a planning study providing an in-depth analysis of its fixed route bus transit service. This comprehensive operational analysis (COA) was the first detailed analysis ...

  14. Fixed Route Comprehensive Operational Analysis, 1994 Operating Year. Third Installment, Route 6: Lake Avenue/Danbury Fair Mall Analysis

    DOT National Transportation Integrated Search

    1995-02-01

    In October, of 1992, the Housatonic Area Regional Transit (HART) District published a planning study providing an in-depth analysis of its fixed route bus transit service. This comprehensive operational analysis (COA) was the first detailed analysis ...

  15. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less

  16. System administrator`s guide to CDPS. Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Didier, B.T.; Portwood, M.H.

    The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less

  17. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  18. Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.

    1981-01-01

    The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.

  19. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...

  20. Unit undergoes controls upgrade to meet cycling needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weston, B.; Tinkham, R.; Chloupek, J.

    1994-04-01

    New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startupmore » and operation.« less

  1. Operational management of offshore energy assets

    NASA Astrophysics Data System (ADS)

    Kolios, A. J.; Martinez Luengo, M.

    2016-02-01

    Energy assets and especially those deployed offshore are subject to a variety of harsh operational and environmental conditions which lead to deterioration of their performance and structural capacity over time. The aim of reduction of CAPEX in new installations shifts focus to operational management to monitor and assess performance of critical assets ensuring their fitness for service throughout their service life and also to provide appropriate and effective information towards requalification or other end of life scenarios, optimizing the OPEX. Over the last decades, the offshore oil & gas industry has developed and applied various approaches in operational management of assets through Structural Health and Condition Monitoring (SHM/CM) systems which can be, at a certain level, transferable to offshore renewable installations. This paper aims to highlight the key differences between offshore oil & gas and renewable energy assets from a structural integrity and reliability perspective, provide a comprehensive overview of different approaches that are available and applicable, and distinguish the benefits of such systems in the efficient operation of offshore energy assets.

  2. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  3. DEVELOPMENT OF REMOTE HANFORD CONNECTOR GASKET REPLACEMENT TOOLING FOR DWPF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krementz, D.; Coughlin, Jeffrey

    2009-05-05

    The Defense Waste Processing Facility (DWPF) requested the Savannah River National Laboratory (SRNL) to develop tooling and equipment to remotely replace gaskets in mechanical Hanford connectors to reduce personnel radiation exposure as compared to the current hands-on method. It is also expected that radiation levels will continually increase with future waste streams. The equipment is operated in the Remote Equipment Decontamination Cell (REDC), which is equipped with compressed air, two master-slave manipulators (MSM's) and an electro-mechanical manipulator (EMM) arm for operation of the remote tools. The REDC does not provide access to electrical power, so the equipment must be manuallymore » or pneumatically operated. The MSM's have a load limit at full extension of ten pounds, which limited the weight of the installation tool. In order to remotely replace Hanford connector gaskets several operations must be performed remotely, these include: removal of the spent gasket and retaining ring (retaining ring is also called snap ring), loading the new snap ring and gasket into the installation tool and installation of the new gasket into the Hanford connector. SRNL developed and tested tools that successfully perform all of the necessary tasks. Removal of snap rings from horizontal and vertical connectors is performed by separate air actuated retaining ring removal tools and is manipulated in the cell by the MSM. In order install a new gasket, the snap ring loader is used to load a new snap ring into a groove in the gasket installation tool. A new gasket is placed on the installation tool and retained by custom springs. An MSM lifts the installation tool and presses the mounted gasket against the connector block. Once the installation tool is in position, the gasket and snap ring are installed onto the connector by pneumatic actuation. All of the tools are located on a custom work table with a pneumatic valve station that directs compressed air to the desired tool and vents the tools as needed. Extensive testing of tooling operation was performed in the DWPF manipulator repair shop. This testing allowed the operators to gain confidence before the equipment was exposed to radioactive contamination. The testing also led to multiple design improvements. On July 17 and 29, 2008 the Remote Gasket Replacement Tooling was successfully demonstrated in the REDC at the DWPF of The Savannah River Site.« less

  4. Diatomite filtration of water for injection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olmsted, B.C. Jr.; Bell, G.R.

    1966-01-01

    A discussion is presented of the capabilities, problems, and answers, in the performance of diatomite filters. The discussion includes a description of diatomite filtration, new developments, design criteria, and some case histories. Diatomite filters, when properly designed and installed, and when properly applied, can provide effective clarification of waters for injection at low capital and operating costs. Design, installation, and proper application, effectiveness, and capital and operating costs can be placed in the proper perspective in the light of general experience and recent pilot plant tests in the southern California area. (30 refs.)

  5. Video Information Communication and Retrieval/Image Based Information System (VICAR/IBIS)

    NASA Technical Reports Server (NTRS)

    Wherry, D. B.

    1981-01-01

    The acquisition, operation, and planning stages of installing a VICAR/IBIS system are described. The system operates in an IBM mainframe environment, and provides image processing of raster data. System support problems with software and documentation are discussed.

  6. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...

  7. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  8. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  9. V/STOL aircraft and method

    DOEpatents

    Owens, P.R.

    1997-11-18

    Aircraft apparatus and method capable of V/STOL (vertical, short takeoff and landing) in addition to conventional flight are disclosed. For V/STOL operation, induced lift is provided by blowing air over the upper surface of each wing through a duct installed near the leading edge. Intake air is supplied to the blowing fan through a duct installed near the trailing edge, thus providing suction as well as blowing. Two fans in series are required. The engine provides power not only to the propeller but also to a transmission which provides power to the pulleys driving the belt-driven fans. 10 figs.

  10. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  11. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  12. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  13. Field Demonstration of Active Desiccant Modules Designed to Integrate with Standard Unitary Rooftop Package Equipment - Final Report: Phase 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, J

    2004-03-15

    This report summarizes the investigation of two active desiccant module (ADM) pilot site installations initiated in 2001. Both pilot installations were retrofits at existing facilities served by conventional heating, ventilating, and air-conditioning (HVAC) systems that had encountered frequent humidity control, indoor air quality (IAQ), and other operational problems. Each installation involved combining a SEMCO, Inc., ADM (as described in Fischer and Sand 2002) with a standard packaged rooftop unit built by the Trane Company. A direct digital control (DDC) system integral to the ADM performed the dual function of controlling the ADM/rooftop combination and facilitating data collection, trending, and remotemore » performance monitoring. The first installation involved providing preconditioned outdoor air to replace air exhausted from the large kitchen hood and bathrooms of a Hooters restaurant located in Rome, Georgia. This facility had previously added an additional rooftop unit in an attempt to achieve occupant comfort without success. The second involved conditioning the outdoor air delivered to each room of a wing of the Mountain Creek Inn at the Callaway Gardens resort. This hotel, designed in the ''motor lodge'' format with each room opening to the outdoors, is located in southwest Georgia. Controlling the space humidity always presented a serious challenge. Uncomfortable conditions and musty odors had caused many guests to request to move to other areas within the resort. This is the first field demonstration performed by Oak Ridge National Laboratory where significant energy savings, operating cost savings, and dramatically improved indoor environmental conditions can all be claimed as the results of a retrofit desiccant equipment field installation. The ADM/rooftop combination installed at the restaurant resulted in a reduction of about 34% in the electricity used by the building's air-conditioning system. This represents a reduction of approximately 15% in overall electrical energy consumption and a 12.5-kW reduction in peak demand. The cost of gas used for regeneration of the desiccant wheel over this period of time is estimated to be only $740, using a gas cost of $0.50 per therm--the summer rate in 2001. The estimated net savings is $5400 annually, resulting in a 1-2 year payback. It is likely that similar energy/cost savings were realized at the Callaway Gardens hotel. In this installation, however, a central plant supplied the chilled water serving fan coil units in the hotel wing retrofitted with the ADM, so it was not metered separately. Consequently, the owner could not provide actual energy consumption data specific to the facility. The energy and operating cost savings at both sites are directly attributable to higher cooling-season thermostat settings and decreased conventional system run times. These field installations were selected as an immediate and appropriate response to correct indoor humidity and fresh air ventilation problems being experienced by building occupants and owners, so no rigorous baseline-building vs. test-building energy use/operating cost savings results can be presented. The report presents several simulated comparisons between the ADM/roof HVAC approach and other equipment combinations, where both desiccant and conventional systems are modeled to provide comparable fresh air ventilation rates and indoor humidity levels. The results obtained from these simulations demonstrate convincingly the energy and operating cost savings obtainable with this hybrid desiccant/vapor-compression technology, verifying those actually seen at the pilot installations. The ADM approach is less expensive than conventional alternatives providing similar performance and indoor air quality and provides a very favorable payback (1 year or so) compared with oversized rooftop units that cannot be operated effectively with the necessary high outdoor air percentages.« less

  14. 30 CFR 250.431 - What are the diverter design and installation requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations... floating drilling operations; (b) Use dual diverter lines arranged to provide for downwind diversion capability; (c) Use at least two diverter control stations. One station must be on the drilling floor. The...

  15. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  16. 77 FR 44110 - Special Conditions: Agusta S.p.A. Model AW139 and AB139 Helicopter, Installation of a Search and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... must comply with the following: (i) The hoist operator control must be designed and located to provide... failures affecting the control system must be evaluated. (ii) The AFCS must be designed so that it cannot... Helicopter, Installation of a Search and Rescue (SAR) Automatic Flight Control System (AFCS) AGENCY: Federal...

  17. 40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; and (2) Install and maintain CPMS to measure and record the pH of the scrubber blowdown according to the requirements in paragraph (e)(2)(i) through (iv) of this section. (i) Locate the pH sensor in a position that provides a representative measurement of the pH and that minimizes or eliminates internal and...

  18. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, has been installed on the south side of the high bay. In view below are several levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Horizontal/Vertical Stock Fund Cost Comparison

    DTIC Science & Technology

    1974-08-01

    units. Installation Supply Division account and other instal- lation operated activities: Self -Service Supply Store, Clothing Initial...installation supply operations are the Self -Service Supply Center, Clothing Sales Store, Central Issue Facility, and Clothing Initial Issue Point. Stock- age...stocks, stocks for installation operated supply activities such as the Self Service Supply Store, Clothing Sales Store and

  20. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.33-20 Section 76.33-20... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so... audible alarm in the engine room. For installations contracted for on or after January 1, 1962, where...

  1. Emerging Technologies for Real-Time Continuous Monitoring of Wellbore Integrity

    NASA Astrophysics Data System (ADS)

    Freifeld, B. M.

    2017-12-01

    Assessment of a well's integrity has traditionally been carried out through periodic wireline logging, often performed only when an operational problem was noted at the surface. There are several emerging technologies that can be installed permanently as part of the well completion and offer the ability to monitor operations while providing continuous indicators to evaluate the structural health of a well. Permanent behind casing instrumentation, such as pressure and temperature gauges can monitor for behind casing leakage. Similarly, fiber-optic distributed temperature and acoustic sensing provide additional information for assessing unwanted movement of fluid, which is indicative of problems either inside or outside of casing. Furthermore, these technologies offer the benefit of providing real-time continuous streams of information that serve as leading-indicators of wellbore problems to allow for early intervention. Additional research is still needed to develop best practices for the installation and operation of these technologies, as they increase cost and add additional risks that must be managed.

  2. 32 CFR 770.54 - Background.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.54 Background. (a) Portsmouth Naval Shipyard maintains and operates facilities “to provide...

  3. 32 CFR 770.54 - Background.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.54 Background. (a) Portsmouth Naval Shipyard maintains and operates facilities “to provide...

  4. 32 CFR 770.54 - Background.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.54 Background. (a) Portsmouth Naval Shipyard maintains and operates facilities “to provide...

  5. 32 CFR 770.54 - Background.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Portsmouth Naval Shipyard, Portsmouth, New Hampshire § 770.54 Background. (a) Portsmouth Naval Shipyard maintains and operates facilities “to provide...

  6. Method and apparatus for energy efficient self-aeration in chemical, biochemical, and wastewater treatment processes

    DOEpatents

    Gao, Johnway [Richland, WA; Skeen, Rodney S [Pendleton, OR

    2002-05-28

    The present invention is a pulse spilling self-aerator (PSSA) that has the potential to greatly lower the installation, operation, and maintenance cost associated with aerating and mixing aqueous solutions. Currently, large quantities of low-pressure air are required in aeration systems to support many biochemical production processes and wastewater treatment plants. Oxygen is traditionally supplied and mixed by a compressor or blower and a mechanical agitator. These systems have high-energy requirements and high installation and maintenance costs. The PSSA provides a mixing and aeration capability that can increase operational efficiency and reduce overall cost.

  7. 75 FR 70703 - Humana Insurance Company a Division of Carenetwork, Inc. Front End Operations and Account...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Division of CareNetwork, Inc., Front End Operations and Account Installation-Product Testing Groups, De... a Division of Carenetwork, Inc. Front End Operations and Account Installation-Product Testing Groups..., a Division of CareNetwork, Inc., Front End Operations and Account Installation- Product Testing...

  8. Stage effects on stalling and recovery of a high-speed 10-stage axial-flow compressor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Copenhaver, W.W.

    1988-01-01

    Results of a high-speed 10-stage axial-flow compressor test involving overall compressor and individual stage performance while stalling and operating in quasi-steady rotating stall are described. Test procedures and data-acquisition methods used to obtain the dynamic stalling and quasi-steady in-stall data are explained. Unstalled and in-stall time-averaged data obtained from the compressor operating at five different shaft speeds and one off-schedule variable vane condition are presented. Effects of compressor speed and variable geometry on overall compressor in-stall pressure rise and hysteresis extent are illustrated through the use of quasi-steady-stage temperature rise and pressure-rise characteristics. Results indicate that individual stage performance duringmore » overall compressor rotating stall operation varies considerably throughout the length of the compressor. The measured high-speed 10-stage test compressor individual stage pressure and temperature characteristics were input into a stage-by-stage dynamic compressor performance model. Comparison of the model results and measured pressures provided the additional validation necessary to demonstrate the model's ability to predict high-speed multistage compressor stalling and in-stall performance.« less

  9. Fixed Route Comprehensive Operational Analysis, 1994 Operating Year. Fourth Installment, Route 2: Berkshire Shopping Center Analysis

    DOT National Transportation Integrated Search

    1995-03-01

    The study evaluated the performance of the service, analyzed possible alternatives, and recommended several service changes, which took effect in August of 1993. By use of ongoing data collection, HART intends to provide continual analysis of the ser...

  10. Measuring the operational efficiency of individual theme park attractions.

    PubMed

    Kim, Changhee; Kim, Soowook

    2016-01-01

    This study assesses the operation efficiency of theme park attractions using the data envelopment analysis, utilizing actual data on 15 attractions at Samsung Everland located in Yongin-si, Republic of Korea. In particular, this study identifies crowding and waiting time as one of the main causes of visitor's satisfaction, and analyzes the efficiency of individual attractions in terms of waiting time. The installation area, installation cost, and annual repair cost are set as input factors and the number of annual users and customer satisfaction as output factors. The results show that the roller coaster-type attractions were less efficient than other types of attractions while rotating-type attractions were relatively more efficient. However, an importance performance analysis on individual attraction's efficiency and satisfaction showed that operational efficiency should not be the sole consideration in attraction installation. In addition, the projection points for input factors for efficient use of attractions and the appropriate reference set for benchmarking are provided as guideline for attraction efficiency management.

  11. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Design data brochure: SIMS prototype system 2

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.

  13. 32 CFR 231.1 - Overview.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... guidance and procedures governing the establishment, support, operation, and termination of banks and... installations provide, and are provided, support consistent with the guidance and procedures stated herein. 1... Staff (JCS), the Joint Staff and the supporting Joint Agencies, the Combatant Commands, the Inspector...

  14. Renewable energy water supply - Mexico program summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, R.

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less

  15. Increasing smoke alarm operability through theory-based health education: a randomised trial

    PubMed Central

    Miller, Ted R; Bergen, Gwen; Ballesteros, Michael F; Bhattacharya, Soma; Gielen, Andrea Carlson; Sheppard, Monique S

    2015-01-01

    Background Although working smoke alarms halve deaths in residential fires, many households do not keep alarms operational. We tested whether theory-based education increases alarm operability. Methods Randomised multiarm trial, with a single arm randomly selected for use each day, in low-income neighbourhoods in Maryland, USA. Intervention arms: (1) Full Education combining a health belief module with a social-cognitive theory module that provided hands-on practice installing alarm batteries and using the alarm’s hush button; (2) Hands-on Practice social-cognitive module supplemented by typical fire department education; (3) Current Norm receiving typical fire department education only. Four hundred and thirty-six homes recruited through churches or by knocking on doors in 2005–2008. Followup visits checked alarm operability in 370 homes (85%) 1–3.5 years after installation. Main outcome measures: number of homes with working alarms defined as alarms with working batteries or hard-wired and number of working alarms per home. Regressions controlled for alarm status preintervention; demographics and beliefs about fire risks and alarm effectiveness. Results Homes in the Full Education and Practice arms were more likely to have a functioning smoke alarm at follow-up (OR=2.77, 95% CI 1.09 to 7.03) and had an average of 0.32 more working alarms per home (95% CI 0.09 to 0.56). Working alarms per home rose 16%. Full Education and Practice had similar effectiveness (p=0.97 on both outcome measures). Conclusions Without exceeding typical fire department installation time, installers can achieve greater smoke alarm operability. Hands-on practice is key. Two years after installation, for every three homes that received hands-on practice, one had an additional working alarm. Trial registration number http://www.clinicaltrials.gov number NCT00139126. PMID:25165090

  16. Solar heating and cooling demonstration project at the Florida solar energy center

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

  17. Automated meteorological data from commercial aircraft via satellite: Present experience and future implications

    NASA Technical Reports Server (NTRS)

    Steinberg, R.

    1978-01-01

    A low-cost communications system to provide meteorological data from commercial aircraft, in neat real-time, on a fully automated basis has been developed. The complete system including the low profile antenna and all installation hardware weighs 34 kg. The prototype system was installed on a B-747 aircraft and provided meteorological data (wind angle and velocity, temperature, altitude and position as a function of time) on a fully automated basis. The results were exceptional. This concept is expected to have important implications for operational meteorology and airline route forecasting.

  18. Natural Bridges National Monument photovoltaic power plant operations manual

    NASA Astrophysics Data System (ADS)

    Coleman, S. D.

    1982-02-01

    After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.

  19. 40 CFR 264.301 - Design and operating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... subsurface soil or ground water or surface water at anytime during the active life (including the closure... waste or leachate to which they are exposed, climatic conditions, the stress of installation, and the stress of daily operation; (ii) Placed upon a foundation or base capable of providing support to the...

  20. 78 FR 69082 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ... source to install and operate monitoring systems and to record the resulting monitoring data. EPA... personal information provided, unless the comment includes profanity, threats, information claimed to be... (operating permits provisions) and Section 114 (enforcement provisions) of the CAA. Section 504(b) directs...

  1. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  2. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  3. Development of a High Temperature Heater using an Yttria Stabilized Zirconia Cored Brick Matrix

    NASA Technical Reports Server (NTRS)

    Smith, K. W.; Decoursin, D. G.

    1971-01-01

    The Ames pilot heater is a ceramic regenerative heater that provides high temperature air for aerodynamic and combustion experiments. The development of this heater to provide a heat storage bed with temperature capability of about 4600 R is described. A bed was designed and installed having cored brick elements of yttria-stabilized zirconia. The bed dimensions were 14 inches in diameter by 10 feet high. The thermal stress limitations of the bed were studied and maximum air flow rates based upon these limits were established. A combustion reheat system was designed and installed to provide the necessary control over the bed temperature distribution. The revised heater system was successfully operated at a maximum bed temperature of 4600 R. The successful operation demonstrated that yttria-stabilized zirconia cored brick can satisfy the high temperature-long duration requirement for storage heater applications.

  4. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  5. Restoration Advisory Board (RAB) Implementation Guidelines

    EPA Pesticide Factsheets

    This document provides recommended procedures for establishing and operating Restoration Advisory Boards (RABs). It is intended as a resource for installation, EPA, and State personnel and citizens who participate in RABs.

  6. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  7. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  8. 48 CFR 52.245-2 - Government Property Installation Operation Services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Provisions and Clauses 52.245-2 Government Property Installation Operation Services. As prescribed in 45.107(b), insert the following clause: Government Property Installation Operation Services (AUG 2010) (a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an...

  9. 48 CFR 52.245-2 - Government Property Installation Operation Services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Provisions and Clauses 52.245-2 Government Property Installation Operation Services. As prescribed in 45.107(b), insert the following clause: Government Property Installation Operation Services (AUG 2010) (a) This Government Property listed in paragraph (e) of this clause is furnished to the Contractor in an...

  10. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  11. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  12. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  13. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  14. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  15. 46 CFR 76.27-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  16. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  17. 49 CFR 236.301 - Where signals shall be provided.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 236.301 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... over a hand-operated switch into interlocking limits if the switch is provided with an electric lock..., electrically. Electric locks installed under this rule must conform to the time and approach locking...

  18. STS-26 Discovery, OV-103, SSME (2019) installed in position number one at KSC

    NASA Image and Video Library

    1988-01-10

    S88-29076 (10 Jan 1988) --- KSC employees work together to carefully guide a 7,000 pound main engine into the number one position in Discovery's aft compartment. Because of the engine's weight and size, special handling equipment is needed to perform the installation. Discovery is currently being prepared for the upcoming STS-26 mission in bay 1 of the Orbiter Processing Facility. This engine, 2019, arrived at KSC on Jan. 6 and was installed Jan. 10. The other two engines are scheduled to be installed later this month. The shuttle's three main liquid fueled engines provide the main propulsion for the orbiter vehicle. The cluster of three engines operate in parallel with the solid rocket boosters during the initial ascent.

  19. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  20. Corps Operations

    DTIC Science & Technology

    2010-11-26

    accomplishes these actions by developing, recommending, and briefing the scheme of fires, including both lethal fires and nonlethal actions (electronic...Install and operate the corps information technology help desk. Provide voice, video teleconference, e-mail—Non-Secure Internet Protocol Router...Network (NIPRNET), SECRET Internet Protocol Router Network (SIPRNET), and other communication networks—assistance, and other help desk functions

  1. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arp, J.A.; Burnett, R.A.; Downing, T.R.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. Themore » system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.« less

  2. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Door design, operation, installation, and testing. 170..., operation, installation, and testing. (a) Each Class 1 door must have a quick action closing device... the welding process so that the door frame is not distorted. (e) For each watertight door which is in...

  3. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  4. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  5. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  6. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  7. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  8. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  9. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  10. 46 CFR 170.270 - Door design, operation, installation, and testing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...

  11. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  12. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  13. 46 CFR 76.30-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  14. 46 CFR 76.25-35 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  15. Selection of pipe repair methods.

    DOT National Transportation Integrated Search

    2013-06-01

    The objective of this research is to provide pipeline operators with testing procedures and : results of the performance of composite pipe repair methods and ultimately, improve their : selection and installation, and reduce the risks associated with...

  16. 46 CFR 169.685 - Electric heating and cooking equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or... spillage on wiring or the deck. (f) Where necessary for safety of personnel, grab rails must be provided...

  17. Handy Cash on Campus.

    ERIC Educational Resources Information Center

    Wiens, Janet

    2000-01-01

    Explores how the installation of independent ATMs on college campuses, often operated by the institution, helps provide students with a greater level of service while potentially increasing bookstore and other business revenue. Several examples are discussed. (GR)

  18. 46 CFR 169.681 - Disconnect switches and devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of... controllers. (e) Disconnect means must be provided to open all conductors of generator and shore power cables...

  19. Boiler house modernization through shared savings program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Breault, R.W.

    1995-12-31

    Throughout Poland as well as the rest of Eastern Europe, communities and industries rely on small heat only boilers to provide district and process heat. Together these two sectors produce about 85,000 MW from boilers in the 2 to 35 MW size range. The bulk of these units were installed prior to 1992 and must be completely overhauled to meet the emission regulations which will be coming into effect on January 1, 1998. Since the only practical fuel is coal in most cases, these boilers must be either retrofit with emission control technology or be replaced entirely. The question thatmore » arises is how to accomplish this given the current tight control of capital in Poland and other East European countries. A solution that we have for this problem is shared savings. These boilers are typically operating with a quiet low efficiency as compared to western standards and with excessive manual labor. Installing modernization equipment to improve the efficiency and to automate the process provides savings. ECOGY provides the funds for the modernization to improve the efficiency, add automation and install emission control equipment. The savings that are generated during the operation of the modernized boiler system are split between the client company and ECOGY for a number of years and then the system is turned over in entirety to the client. Depending on the operating capacity, the shared savings agreement will usually span 6 to 10 years.« less

  20. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  1. The implementation of physical safety system in bunker of the electron beam accelerator

    NASA Astrophysics Data System (ADS)

    Ahmad, M. A.; Hashim, S. A.; Ahmad, A.; Leo, K. W.; Chulan, R. M.; Dalim, Y.; Baijan, A. H.; Zain, M. F.; Ros, R. C.

    2017-01-01

    This paper describes the implementation of physical safety system for the new low energy electron beam (EB) accelerator installed at Block 43T Nuclear Malaysia. The low energy EB is a locally designed and developed with a target energy of 300 keV. The issues on radiation protection have been addressed by the installation of radiation shielding in the form of a bunker and installation radiation monitors. Additional precaution is needed to ensure that personnel are not exposed to radiation and other physical hazards. Unintentional access to the radiation room can cause serious hazard and hence safety features must be installed to prevent such events. In this work we design and built a control and monitoring system for the shielding door. The system provides signals to the EB control panel to allow or prevent operation. The design includes limit switches, key-activated switches and emergency stop button and surveillance camera. Entry procedure is also developed as written record and for information purposes. As a result, through this safety implementation human error will be prevented, increase alertness during operation and minimizing unnecessary radiation exposure.

  2. 49 CFR 195.262 - Pumping equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PIPELINE Construction § 195.262 Pumping equipment. (a) Adequate ventilation must be provided in pump... provided in each pump station: (1) Safety devices that prevent overpressuring of pumping equipment..., pumping equipment must be installed on property that is under the control of the operator and at least 15...

  3. 49 CFR 195.262 - Pumping equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PIPELINE Construction § 195.262 Pumping equipment. (a) Adequate ventilation must be provided in pump... provided in each pump station: (1) Safety devices that prevent overpressuring of pumping equipment..., pumping equipment must be installed on property that is under the control of the operator and at least 15...

  4. 49 CFR 195.262 - Pumping equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PIPELINE Construction § 195.262 Pumping equipment. (a) Adequate ventilation must be provided in pump... provided in each pump station: (1) Safety devices that prevent overpressuring of pumping equipment..., pumping equipment must be installed on property that is under the control of the operator and at least 15...

  5. 49 CFR 195.262 - Pumping equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PIPELINE Construction § 195.262 Pumping equipment. (a) Adequate ventilation must be provided in pump... provided in each pump station: (1) Safety devices that prevent overpressuring of pumping equipment..., pumping equipment must be installed on property that is under the control of the operator and at least 15...

  6. DOE/NREL supported wind energy activities in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less

  7. The introduction of space technology power systems into developing countries

    NASA Technical Reports Server (NTRS)

    Roberts, Allen F.; Ratajczak, Anthony F.

    1989-01-01

    Between 1978 and 1984, NASA-Lewis was responsible for the design, fabrication, installation and operational support of 57 photovoltaic power systems in 27 countries. These systems were installed in locations not served by a central power system and ranged in size from 40 W for powering street lights to 29 kW for providing power to a complete village. Several of the system projects had socio/economic studies components that provided for an assessment of how the introduction of both electricity and a novel high technology power system affected the users and their society.

  8. Long Term Performance Metrics of the GD SDR on the SCaN Testbed: The First Year on the ISS

    NASA Technical Reports Server (NTRS)

    Nappier, Jennifer; Wilson, Molly C.

    2014-01-01

    The General Dynamics (GD) S-Band software defined radio (SDR) in the Space Communications and Navigation (SCaN) Testbed on the International Space Station (ISS) provides experimenters an opportunity to develop and demonstrate experimental waveforms in space. The SCaN Testbed was installed on the ISS in August of 2012. After installation, the initial checkout and commissioning phases were completed and experimental operations commenced. One goal of the SCaN Testbed is to collect long term performance metrics for SDRs operating in space in order to demonstrate long term reliability. These metrics include the time the SDR powered on, the time the power amplifier (PA) is powered on, temperature trends, error detection and correction (EDAC) behavior, and waveform operational usage time. This paper describes the performance of the GD SDR over the first year of operations on the ISS.

  9. A feasibility assessment of nuclear reactor power system concepts for the NASA Growth Space Station

    NASA Technical Reports Server (NTRS)

    Bloomfield, H. S.; Heller, J. A.

    1986-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth Space Station architecture was conducted to address a variety of installation, operational, disposition and safety issues. A previous NASA sponsored study, which showed the advantages of Space Station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide a feasibility of each combination.

  10. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... group: (1) Radio and electronic equipment—for improper installation and insecure mounting. (2) Wiring...) Systems and components—for improper installation, apparent defects, and unsatisfactory operation. (3...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  11. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. 47 CFR 78.33 - Special temporary authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities, a request may be made for special temporary authority to install and operate new equipment or to... with § 78.18: Provided, however, That in the case of events of widespread interest and importance that...

  13. 5. 7 MW Tornados for Dunn Paper mill power CHP plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffs, E.

    The first commercial installation in the United States of Ruston's high efficiency Tornado gas turbine is now fully operational at the Dunn Paper Company's Port Huron, Michigan paper mill where they make special light weight papers for packaging and business forms. It's a cogeneration installation powered by three Tornados and two waste heat recovery boilers which provide the mill with all of its electricity and process steam requirements - at high overall thermal efficiency.

  14. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  15. KSC technician installs rows of experiment racks in IML-1 spacelab module

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Kennedy Space Center (KSC) technician installs rows of experiment racks in the International Microgravity Laboratory 1 (IML-1) in the KSC Operations and Checkout (O and C) Bldg. The IML-1 is scheduled to fly on STS-42 in early 1992, and will turn the shuttle into a laboratory dedicated to investigating the effects of microgravity on materials and life processes. View provided by KSC with alternate number KSC-91P-169.

  16. Dendroscope: An interactive viewer for large phylogenetic trees

    PubMed Central

    Huson, Daniel H; Richter, Daniel C; Rausch, Christian; Dezulian, Tobias; Franz, Markus; Rupp, Regula

    2007-01-01

    Background Research in evolution requires software for visualizing and editing phylogenetic trees, for increasingly very large datasets, such as arise in expression analysis or metagenomics, for example. It would be desirable to have a program that provides these services in an effcient and user-friendly way, and that can be easily installed and run on all major operating systems. Although a large number of tree visualization tools are freely available, some as a part of more comprehensive analysis packages, all have drawbacks in one or more domains. They either lack some of the standard tree visualization techniques or basic graphics and editing features, or they are restricted to small trees containing only tens of thousands of taxa. Moreover, many programs are diffcult to install or are not available for all common operating systems. Results We have developed a new program, Dendroscope, for the interactive visualization and navigation of phylogenetic trees. The program provides all standard tree visualizations and is optimized to run interactively on trees containing hundreds of thousands of taxa. The program provides tree editing and graphics export capabilities. To support the inspection of large trees, Dendroscope offers a magnification tool. The software is written in Java 1.4 and installers are provided for Linux/Unix, MacOS X and Windows XP. Conclusion Dendroscope is a user-friendly program for visualizing and navigating phylogenetic trees, for both small and large datasets. PMID:18034891

  17. KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lift the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) prior to its installation in the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

    NASA Image and Video Library

    1997-01-18

    KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility lift the Near Infrared Camera and Multi-Object Spectrometer (NICMOS) prior to its installation in the Second Axial Carrier. NICMOS is one of two new scientific instruments that will replace two outdated instruments on the Hubble Space Telescope (HST). NICMOS will provide HST with the capability for infrared imaging and spectroscopic observations of astronomical targets. The refrigerator-sized NICMOS also is HST's first cryogenic instrument — its sensitive infrared detectors must operate at very cold temperatures of minus 355 degrees Fahrenheit or 58 degrees Kelvin. NICMOS will be installed in Hubble during STS-82, the second Hubble Space Telescope servicing mission. Liftoff is targeted Feb. 11 aboard Discovery with a crew of seven.

  18. Geothermal Heat Pumps Score High Marks in Schools.

    ERIC Educational Resources Information Center

    National Renewable Energy Lab (DOE).

    Geothermal heat pumps (GHPs) are showing their value in providing lower operating and maintenance costs, energy efficiency, and superior classroom comfort. This document describes what GHPs are and the benefits a school can garner after installing a GHP system. Three case studies are provided that illustrate these benefits. Finally, the Department…

  19. 75 FR 77524 - Special Conditions: Sikorsky Aircraft Corporation Model S-92A Helicopter; Installation of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... must provide fail-safe operations during coupled maneuvers. The demonstration of fail-safe operations... receive your comments by February 11, 2011. ADDRESSES: You must mail or deliver two copies of your... your comments: Docket No. SW023. You can inspect comments in the Docket on weekdays, except Federal...

  20. Littoral Combat Ships. Relating Performance to Mission Package Inventories, Homeports, and Installation Sites

    DTIC Science & Technology

    2007-01-01

    determine specific asset counts for each scenario. For example, we calculated that a specific stability operation in South America might require an...Stability Operations We considered stability operations that may occur in three geographic regions: West Africa, South America , and Southeast Asia. These...earthquake or tsunami disaster in South Asia and South- east Asia, providing aid following landslides in South America , and responding to similar

  1. USAF solar thermal applications case studies

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The potential of solar energy technologies to meet mission related applications for process heat was investigated. The reduction of the dependence of military installations on fossil fuels by promoting the use of more abundant resources where liquid hydrocarbons and natural gas are now used is examined. The evaluation and utilization of renewable energy systems to provide process heat and space heating are emphasized. The application of thermal energy systems is divided into four steps: (1) investigation of the potential operational cost effectiveness of selected thermal technologies; (2) selection of a site and preliminary design of point focussing solar thermal plant; (3) construction and test of an engineering prototype; and (4) installation and operation of a solar thermal energy plant.

  2. Long-term Testing Results for the 2008 Installation of LED Luminaires at the I-35 West Bridge in Minneapolis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzey, Bruce R.; Davis, Robert G.

    2014-09-30

    This document reports the long-term testing results from an extended GATEWAY project that was first reported in “Demonstration Assessment of Light-Emitting Diode (LED) Roadway Lighting at the I-35W Bridge, in Minneapolis, MN,” August 2009. That original report presented the results of lighting the newly reconstructed I 35W Bridge using LEDs in place of conventional high-pressure sodium (HPS) roadway luminaires, comparing energy use and illuminance levels with a simulated baseline condition. That installation was an early stage implementation of LED lighting and remains one of the oldest installations in continued operation today. This document provides an update of the LED system’smore » performance since its installation in September 2008.« less

  3. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    Construction workers assist as a crane lifts the Core Stage Forward Skirt Umbilical up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  6. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    Cranes and rigging are being used to lift up the Core Stage Forward Skirt Umbilical (CSFSU) for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  7. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    A construction worker welds a metal part during installation of the Core Stage Forward Skirt Umbilical on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  8. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    Construction workers assist as a crane lifts the Core Stage Forward Skirt Umbilical into position for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  9. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuously operate a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a...

  10. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  11. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  12. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  13. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  14. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  15. Energy and water quality management systems for water utility's operations: a review.

    PubMed

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. Increasing smoke alarm operability through theory-based health education: a randomised trial.

    PubMed

    Miller, Ted R; Bergen, Gwen; Ballesteros, Michael F; Bhattacharya, Soma; Gielen, Andrea Carlson; Sheppard, Monique S

    2014-12-01

    Although working smoke alarms halve deaths in residential fires, many households do not keep alarms operational. We tested whether theory-based education increases alarm operability. Randomised multiarm trial, with a single arm randomly selected for use each day, in low-income neighbourhoods in Maryland, USA. Intervention arms: (1) Full Education combining a health belief module with a social-cognitive theory module that provided hands-on practice installing alarm batteries and using the alarm's hush button; (2) Hands-on Practice social-cognitive module supplemented by typical fire department education; (3) Current Norm receiving typical fire department education only. Four hundred and thirty-six homes recruited through churches or by knocking on doors in 2005-2008. Follow-up visits checked alarm operability in 370 homes (85%) 1-3.5 years after installation. number of homes with working alarms defined as alarms with working batteries or hard-wired and number of working alarms per home. Regressions controlled for alarm status preintervention; demographics and beliefs about fire risks and alarm effectiveness. Homes in the Full Education and Practice arms were more likely to have a functioning smoke alarm at follow-up (OR=2.77, 95% CI 1.09 to 7.03) and had an average of 0.32 more working alarms per home (95% CI 0.09 to 0.56). Working alarms per home rose 16%. Full Education and Practice had similar effectiveness (p=0.97 on both outcome measures). Without exceeding typical fire department installation time, installers can achieve greater smoke alarm operability. Hands-on practice is key. Two years after installation, for every three homes that received hands-on practice, one had an additional working alarm. http://www.clinicaltrials.gov number NCT00139126. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  17. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    A heavy-load transport truck carrying the Orion crew access arm nears the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  18. Solar hot water system installed at Anderson, South Carolina

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description is given of the solar energy hot water system installed in the Days Inns of America, Inc., at Anderson, South Carolina. The building is a low-rise, two-story 114-room motel. The solar system was designed to provide 40 percent of the total hot water demand. The collector is a flat plate, liquid with an area of 750 square feet. Operation of this system was begun in November 1977, and has performed flawlessly for one year.

  19. Current and emerging laser sensors for greenhouse gas sensing and leak detection

    NASA Astrophysics Data System (ADS)

    Frish, Michael B.

    2014-05-01

    To reduce atmospheric accumulation of the greenhouse gases methane and carbon dioxide, networks of continuously operating sensors that monitor and map their sources are desirable. In this paper, we discuss advances in laser-based open-path leak detectors, as well as technical and economic challenges inhibiting widespread sensor deployment for "ubiquitous monitoring". We describe permanently-installed, wireless, solar-powered sensors that overcome previous installation and maintenance difficulties while providing autonomous real-time leak reporting without false alarms.

  20. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  1. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  2. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  3. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  4. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  5. 78 FR 23685 - Airworthiness Directives; The Boeing Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...

  6. Cabin fuselage structural design with engine installation and control system

    NASA Technical Reports Server (NTRS)

    Balakrishnan, Tanapaal; Bishop, Mike; Gumus, Ilker; Gussy, Joel; Triggs, Mike

    1994-01-01

    Design requirements for the cabin, cabin system, flight controls, engine installation, and wing-fuselage interface that provide adequate interior volume for occupant seating, cabin ingress and egress, and safety are presented. The fuselage structure must be sufficient to meet the loadings specified in the appropriate sections of Federal Aviation Regulation Part 23. The critical structure must provide a safe life of 10(exp 6) load cycles and 10,000 operational mission cycles. The cabin seating and controls must provide adjustment to account for various pilot physiques and to aid in maintenance and operation of the aircraft. Seats and doors shall not bind or lockup under normal operation. Cabin systems such as heating and ventilation, electrical, lighting, intercom, and avionics must be included in the design. The control system will consist of ailerons, elevator, and rudders. The system must provide required deflections with a combination of push rods, bell cranks, pulleys, and linkages. The system will be free from slack and provide smooth operation without binding. Environmental considerations include variations in temperature and atmospheric pressure, protection against sand, dust, rain, humidity, ice, snow, salt/fog atmosphere, wind and gusts, and shock and vibration. The following design goals were set to meet the requirements of the statement of work: safety, performance, manufacturing and cost. To prevent the engine from penetrating the passenger area in the event of a crash was the primary safety concern. Weight and the fuselage aerodynamics were the primary performance concerns. Commonality and ease of manufacturing were major considerations to reduce cost.

  7. Automated meteorological data from commercial aircraft via satellite - Present experience and future implications

    NASA Technical Reports Server (NTRS)

    Steinberg, R.

    1978-01-01

    The National Aeronautics and Space Administration has developed a low-cost communications system to provide meteorological data from commercial aircraft, in near real-time, on a fully automated basis. The complete system including the low profile antenna and all installation hardware weighs 34 kg. The prototype system has been installed on a Pan American B-747 aircraft and has been providing meteorological data (wind angle and velocity, temperature, altitude and position as a function of time) on a fully automated basis for the past several months. The results have been exceptional. This concept is expected to have important implications for operational meteorology and airline route forecasting.

  8. Solar residential heating and cooling system development test program

    NASA Technical Reports Server (NTRS)

    Humphries, W. R.; Melton, D. E.

    1974-01-01

    A solar heating and cooling system is described, which was installed in a simulated home at Marshall Space Flight Center. Performance data are provided for the checkout and initial operational phase for key subsystems and for the total system. Valuable information was obtained with regard to operation of a solar cooling system during the first summer of operation. Areas where improvements and modifications are required to optimize such a system are discussed.

  9. 30 CFR 250.1000 - General requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT, DEPARTMENT OF THE... shall be designed, installed, operated, maintained, and abandoned to provide safe and pollution-free..., over-pressure protection devices, cathodic protection equipment, and pigging devices, etc.) that serve...

  10. "Invisible" Killer

    MedlinePlus

    ... allow CO to come indoors. In addition, install battery-operated CO alarms or plug-in CO alarms with battery back-up in your home. Every home should ... Test your CO alarms frequently and replace dead batteries. A CO alarm can provide added protection, but ...

  11. State-of-the-Technology on Advanced Drainage Concepts

    EPA Science Inventory

    Fostering and promoting the implementation of innovative and green technology for new and retrofitting existing urban drainage systems will reduce installation and operation and management costs, energy needs, and provide for aesthetic enhancement of these systems. The anticipat...

  12. The Financial Impact of Using TMR in a Private Group Practice

    PubMed Central

    Templeton, Joan; Bernes, Marshall; Ostrowski, Maureen

    1982-01-01

    The installation of a computerized financial system is usually preceded by a cost-benefit analysis showing a positive impact on the facility's financial picture. The administration expects reduction in some operating costs (exclusive of the system and the installation costs) and an improvement in collecting accounts receivable. When California Primary Physicians installed TMR, certain costs were reduced, and the business office did become more efficient. However, because TMR is an integrated medical/financial system, other financial benefits accrued to the practice that billing systems would never be able to provide. This paper discusses the financial impact of TMR on cost reduction, accounts receivable collection, revenue tracking, and program development and marketing.

  13. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the south wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a construction worker assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  17. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Virtual Planning at Work: A Tour of NASA Future Flight Central

    NASA Technical Reports Server (NTRS)

    McClenahen, Jim; Dorighi, Nancy S. (Technical Monitor)

    2000-01-01

    FutureFlight Central will permit integration of tomorrow's technologies in a risk-free simulation of any airport, airfield, and tower cab environment. The facility provides an opportunity for airlines to mitigate passenger delays by fine tuning airport hub operations, gate management and ramp movement procedures. It also allows airport managers an opportunity to study effects of various improvements at their airports. Finally, it enables air traffic controllers to provide feedback and to become familiar with new airport operations and technologies before final installation.

  20. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  1. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  2. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  3. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  4. 40 CFR Table 11 to Subpart Sssss... - Applicability of General Provisions to Subpart SSSSS

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(A) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(B) CMS Requirements Applies only to sources required to install and operate a THC CEMS. § 63.8(c)(7)(i)(C) CMS...

  5. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  6. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  7. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  8. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  9. Instructor's Manual for Teaching and Practical Courses on Design of Systems and Sizing, Installation and Operation of Systems for Solar Heating and Cooling of Residential Buildings.

    ERIC Educational Resources Information Center

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    Presented are guidelines for instructors of two courses in the design, installation, and operation of solar heating and cooling systems. These courses are: (1) Design of Systems, and (2) Sizing, Installation, and Operation of Systems. Limited in scope to active solar systems for residential buildings, these courses place primary emphasis upon…

  10. ASTP video tape recorder ground support equipment (audio/CTE splitter/interleaver). Operations manual

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A descriptive handbook for the audio/CTE splitter/interleaver (RCA part No. 8673734-502) was presented. This unit is designed to perform two major functions: extract audio and time data from an interleaved video/audio signal (splitter section), and provide a test interleaved video/audio/CTE signal for the system (interleaver section). It is a rack mounting unit 7 inches high, 19 inches wide, 20 inches deep, mounted on slides for retracting from the rack, and weighs approximately 40 pounds. The following information is provided: installation, operation, principles of operation, maintenance, schematics and parts lists.

  11. Task parameters affecting ergonomic demands and productivity of HVAC duct installation.

    PubMed

    Mitropoulos, Panagiotis; Hussain, Sanaa; Guarascio-Howard, Linda; Memarian, Babak

    2014-01-01

    Mechanical installation workers experience work-related musculoskeletal disorders (WMSDs) at high rates. (1) Quantify the ergonomic demands during HVAC installation, (2) identify the tasks and task parameters that generated extreme ergonomic demands, and (3) propose improvements to reduce the WMSDs among mechanical workers. The study focused on installation of rectangular ductwork components using ladders, and analyzed five operations by two mechanical contractors. Using continuous time observational assessment, the videotaped operations were analyzed along two dimensions: (1) the production tasks and durations, and (2) the ergonomic demands for four body regions (neck, arms/shoulders, back, and knees). The analysis identified tasks with low portion of productive time and high portion of extreme postures, and task parameters that generated extreme postures. Duct alignment was the task with the highest portion of extreme postures. The position of the ladder (angle and distance from the duct) was a task parameter that strongly influenced the extreme postures for back, neck and shoulders. Other contributing factors included the difficulty to reach the hand tools when working on the ladder, the congestion of components in the ceiling, and the space between the duct and the ceiling. The identified tasks and factors provide directions for improvement.

  12. Integration& Operation of a Microgrid at Santa Rita Jail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chevron Energy Solutions; Alameda County; DeForest, Nicholas

    2011-05-01

    Santa Rita Jail is a 4,500 inmate facility located in Dublin CA, approximately 40 miles (65 km) east of San Francisco. Over the past decade, a series of Distributed Energy Resources (DER) installations and efficiency measures have been undertaken to transform the 3MW facility into a"Green Jail". These include a 1.2MW rated rooftop PV system installed in 2002, a 1MW molten carbonate fuel cell with CHP, and retrofits to lighting and HVAC systems to reduce peak loads. With the upcoming installation of a large-scale battery and fast static disconnect switch, Santa Rita Jail will become a true microgrid, with fullmore » CERTS Microgrid functionality. Consequently, the jail will be able to seamlessly disconnect from the grid and operate as an island in the event of a disturbance, reconnecting again once the disturbance has dissipated. The extent to which that jail is capable of islanding is principally dependant on the energy capacity of the battery-one focus of this investigation. Also presented here are overviews of the DER currently installed at the jail, as well as the value it provides by offsetting the purchase of electricity under the current Pacific Gas& Electric (PG&E) tariff.« less

  13. Construction quality assurance report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roscha, V.

    1994-09-08

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Constructionmore » Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.« less

  14. 78 FR 61401 - Entergy Nuclear Operations, Inc.; Big Rock Point; Independent Spent Fuel Storage Installation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-155; 72-43 and NRC-2013-0218] Entergy Nuclear Operations, Inc.; Big Rock Point; Independent Spent Fuel Storage Installation AGENCY: Nuclear Regulatory... the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI). ADDRESSES: Please refer...

  15. 30 CFR 77.211-1 - Continuous methane monitoring device; installation and operation; automatic deenergization of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...

  16. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  17. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  18. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  19. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  20. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  1. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  2. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  3. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  4. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  5. 30 CFR 77.211-1 - Continuous methane monitoring device; installation and operation; automatic deenergization of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Continuous methane monitoring device... Installations § 77.211-1 Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment. Continuous methane monitoring devices shall be set to deenergize...

  6. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    A crane has been attached to the Core Stage Forward Skirt Umbilical (CSFSU) to lift it up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  7. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    Cranes and rigging are being used to lift the Core Stage Forward Skirt Umbilical (CSFSU) into position for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System (SLS) rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  8. Core Stage Forward Skirt Umbilical Installation onto Mobile Laun

    NASA Image and Video Library

    2017-05-25

    Seeming to hang in midair, the Core Stage Forward Skirt Umbilical (CSFSU) is lifted high up by crane for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The CSFSU will be located at about the 180-foot level on the tower, above the liquid oxygen tank. The CSFSU is an umbilical that will swing into position to provide connections to the core stage forward skirt of the SLS rocket, and then swing away before launch. Its main purpose is to provide conditioned air/GN2 to the SLS core stage forward skirt cavity. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  9. Investment in workforce health: exploring the implications for workforce safety climate and commitment.

    PubMed

    Mearns, Kathryn; Hope, Lorraine; Ford, Michael T; Tetrick, Lois E

    2010-09-01

    The relationship between investment in employee health and non-health outcomes has received little research attention. Drawing from social exchange and climate theory, the current study uses a multilevel approach to examine the implications of worksite health investment for worksite safety and health climate and employee safety compliance and commitment to the worksite. Data were collected from 1932 personnel working on 31 offshore installations operating in UK waters. Installation medics provided corporate workforce health investment details for 20 of these installations. The findings provide support for a strong link between health investment practices and worksite safety and health climate. The results also found a relationship between health investment practices and organizational commitment among employees. These results suggest that health investment practices are associated with committed workforces and climates that reflect a priority on health and safety. 2009 Elsevier Ltd. All rights reserved.

  10. New safety rules challenge U. K. operators, regulators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hudson, J.

    1994-08-15

    Offshore safety regulations based on lessons learned from the Piper Alpha blast of 1988 have been in operation in the U.K. for a year. The Offshore Installations (Safety Case) Regulations 1992 make operators of fixed and mobile installations (the duty holders'') responsible for producing a formal safety assessment, or safety case, for each installation. After the end of November 1995 it will be an offense to operate an installation without a safety case which has been approved by the government's Health and Safety Executive (HSE). Producing safety cases for installations is a major task for duty holder, while assessing themmore » is a huge under taking for HSE's Offshore Safety Division (OSD). This paper reviews how HSE has established management arrangements to handle safety cases, considers progress in assessment, highlights some of the important lessons learned, and look to the future.« less

  11. An EarthScope Plate Boundary Observatory Progress Report

    NASA Astrophysics Data System (ADS)

    Jackson, M.; Anderson, G.; Blume, F.; Walls, C.; Coyle, B.; Feaux, K.; Friesen, B.; Phillips, D.; Hafner, K.; Johnson, W.; Mencin, D.; Pauk, B.; Dittmann, T.

    2007-12-01

    UNAVCO is building and operating the Plate Boundary Observatory (PBO), part of the NSF-funded EarthScope project to understand the structure, dynamics, and evolution of the North American continent. When complete in October 2008, the 875 GPS, 103 strain and seismic, and 28 tiltmeters stations will comprise the largest integrated geodetic and seismic network in United States and the second largest in the world. Data from the PBO network will facilitate research into plate boundary deformation with unprecedented scope and detail. As of 1 September 2007, UNAVCO had completed 680 PBO GPS stations and had upgraded 89% of the planned PBO Nucleus stations. Highlights of the past year's work include the expansion of the Alaska subnetwork to 95 continuously-operating stations, including coverage of Akutan and Augustine volcanoes and reconnaissance for future installations on Unimak Island; the installation of nine new stations on Mt. St. Helens; and the arrival of 33 permits for station installations on BLM land in Nevada. The Augustine network provided critical data on magmatic and volcanic processes associated with the 2005-2006 volcanic crisis, and has expanded to a total of 11 stations. Please visit http://pboweb.unavco.org/?pageid=3 for further information on PBO GPS network construction activities. As of September 2007, 41 PBO borehole stations had been installed and three laser strainmeter stations were operating, with a total of 60 borehole stations and 4 laser strainmeters expected by October 2007. In response to direction from the EarthScope community, UNAVCO installed a dense network of six stations along the San Jacinto Fault near Anza, California; installed three of four planned borehole strainmeter stations on Mt. St. Helens; and has densified coverage of the Parkfield area. Please visit http://pboweb.unavco.org/?pageid=8 for more information on PBO strainmeter network construction progress. The combined PBO/Nucleus GPS network provides 350 GB of raw standard rate data, with special downloads of more than 250 GB of high-rate GPS data following large earthquakes in Russia, Tonga, and Peru, as well as for community requests. The standard rate GPS data are processed routinely to generate data products including station position time series, velocity vectors, and related information, and all data products are available from the UNAVCO Facility archive. The PBO seismic network seismic network has provided 201 GB of raw data, which are available via Antelope and Earthworm from PBO and via the IRIS Data Management Center (DMC); we provide data to seismic networks operated from Caltech, UCSD, UCSB, University of Washington, and the Pacific Geosciences Center in Sidney, BC. The PBO strainmeter network has provided 93 GB of raw data, available in both raw native format and SEED format from the Northern California Earthquake Data Center and the IRIS DMC, along with higher-level products such as cleaned strain time series and related information. Please visit http://pboweb.unavco.org/gps_data and http://pboweb.unavco.org/strain_data for more information on PBO GPS and strainmeter/seismic data products, respectively.

  12. V/STOL wind-tunnel testing

    NASA Technical Reports Server (NTRS)

    Koenig, D. G.

    1984-01-01

    Factors influencing effective program planning for V/STOL wind-tunnel testing are discussed. The planning sequence itself, which includes a short checklist of considerations that could enhance the value of the tests, is also described. Each of the considerations, choice of wind tunnel, type of model installation, model development and test operations, is discussed, and examples of appropriate past and current V/STOL test programs are provided. A short survey of the moderate to large subsonic wind tunnels is followed by a review of several model installations, from two-dimensional to large-scale models of complete aircraft configurations. Model sizing, power simulation, and planning are treated, including three areas is test operations: data-acquisition systems, acoustic measurements in wind tunnels, and flow surveying.

  13. Status and outlook of the CRYRING@ESR project

    NASA Astrophysics Data System (ADS)

    Geithner, W.; Andelkovic, Z.; Beck, D.; Bräuning, H.; Bräuning-Demian, A.; Danared, H.; Dimopoulou, C.; Engström, M.; Fedotova, S.; Gorda, O.; Herfurth, F.; Hess, R.; Källberg, A.; Kleffner, C.; Kotovskiy, N.; Kraus, I.; Lestinsky, M.; Litvinov, S.; Nolden, F.; Reiter, A.; Sieber, T.; Steck, M.; Vorobyev, G.

    2017-11-01

    Once operational, CRYRING@ESR will store and decelerate ions delivered by the experimental storage ring ESR at energies well below those of ESR. In addition to that, CRYRING@ESR has an electron cooler operating with an ultracold electron beam, allowing to provide cooled ion beams for precision experiments. These ions will be delivered to a broad range of experiments presently in preparation; either in-ring or extracted to a dedicated beamline for experiments. An overview and status report of the installation and commissioning of the CRYRING-@ESR storage ring for highly charged ions at the GSI Helmholtzzentrum für Schwerionenforschung is presented. The installation of this storage ring started in 2014 and was completing end of 2016, when this publication was written.

  14. Testing an Open Source installation and server provisioning tool for the INFN CNAF Tierl Storage system

    NASA Astrophysics Data System (ADS)

    Pezzi, M.; Favaro, M.; Gregori, D.; Ricci, P. P.; Sapunenko, V.

    2014-06-01

    In large computing centers, such as the INFN CNAF Tier1 [1], is essential to be able to configure all the machines, depending on use, in an automated way. For several years at the Tier1 has been used Quattor[2], a server provisioning tool, which is currently used in production. Nevertheless we have recently started a comparison study involving other tools able to provide specific server installation and configuration features and also offer a proper full customizable solution as an alternative to Quattor. Our choice at the moment fell on integration between two tools: Cobbler [3] for the installation phase and Puppet [4] for the server provisioning and management operation. The tool should provide the following properties in order to replicate and gradually improve the current system features: implement a system check for storage specific constraints such as kernel modules black list at boot time to avoid undesired SAN (Storage Area Network) access during disk partitioning; a simple and effective mechanism for kernel upgrade and downgrade; the ability of setting package provider using yum, rpm or apt; easy to use Virtual Machine installation support including bonding and specific Ethernet configuration; scalability for managing thousands of nodes and parallel installations. This paper describes the results of the comparison and the tests carried out to verify the requirements and the new system suitability in the INFN-T1 environment.

  15. STS-56, RSRM-031, 360L031 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build-up, booster assembly, and closeout for STS-56, RSRM flight set 36OL031. Section 2.0 contains a summary of RSRM-031 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-031 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-031 flow. Section 7.0 provides recommendations, if any, for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumables information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  16. STS-51, RSRM-033, 360T033 KSC processing configuration and data report

    NASA Technical Reports Server (NTRS)

    Hillard, Robert C.

    1993-01-01

    KSC Processing Configuration and Data Report is being provided as a historical document and as an enhancement to future RSRM manufacturing and processing operations. The following sections provide information on segment receipt, aft booster build up, motor assembly, and closeout for STS-51, RSRM flight set 360T033. Section 2.0 contains a summary of RSRM-033 processing. Section 3.0 discusses any significant problems or special issues that require special attention. Sections 4.0 through 6.0 contain narrative descriptions of all key events, including any related processing problems. Appendix A provides engineering specifications and changes. A list and matrix of all problem reports (PR's) pertinent to this flight set is provided in Appendix B. The matrix was provided by the Thiokol LSS Quality Engineering office. Copies of the PR's generated during the processing of RSRM-033 will be provided upon request. Appendix C contains the motor set status matrix, which provides milestone dates for the RSRM-033 flow. Section 7.0 provides recommendations for the improvement of flight hardware processing. Section 8.0 contains data sheets that provide flight hardware parts and consumable information installed during the booster build-up and stacking operations by location, lot/serial number, expiration and cure dates/times, and installation dates.

  17. ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience

    NASA Astrophysics Data System (ADS)

    Koveshnikov, A.; Bylinskii, I.; Hodgson, G.; Kishi, D.; Laxdal, R.; Ma, Y.; Nagimov, R.; Yosifov, D.

    2015-12-01

    The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience.

  18. NASA safety manual. Volume 9: Fire protection

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Requirements are identified and guidelines are provided for implementing a comprehensive fire protection program. These requirements and guidelines are applicable to NASA headquarters and field installations. Portions also can be applied to NASA contractor operations within the scope of the contract.

  19. An assessment of high-speed rail safety issues and research needs

    DOT National Transportation Integrated Search

    1990-12-01

    The objectives of the study were to provide the Federal Railroad Administration Office of Research and Development with the following information: A general description and operating characteristics of high-speed rail systems likely to be installed i...

  20. Overseas Environmental Baseline Guidance Document

    DTIC Science & Technology

    2007-05-01

    The primary purpose of this Overseas Environmental Baseline Guidance Document (OEBGD) is to provide criteria and management practices to be used by ...establishes standards for environmental compliance at Department of Defense controlled or operated installations in countries for which no FGS have been established.

  1. ASTP video tape recorder ground support equipment, addendum 1 (CTE splitter/buffer). Operations manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A descriptive handbook for the CTE splitter (RCA part No. 8673734-503) was presented. This unit is designed to extract time data from an interleaved video audio signal. It is a rack mounting unit 7 inches high, 19 inches wide, 20 inches deep, mounted on slides for retracting from the rack, and weighs approximately 40 pounds. The following information is provided: installation, operation, principles of operation, maintenance, schematics and parts lists.

  2. ASTP video tape recorder ground support equipment, addendum 2 (CTE splitter/buffer). Operations manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A descriptive handbook for the CTE splitter (RCA part No. 8673734-50A) was presented. This unit is designed to extract time data from an interleaved video/audio signal. It is a rack mounting unit 7 inches high, 19 inches wide, 20 inches deep, mounted on slides for retracting from the rack, and weighs approximately 40 pounds. The following information is provided: installation, operation, principles of operation, maintenance, schematics and parts lists.

  3. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  4. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  5. 40 CFR 63.7830 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...

  6. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.430 When must I install a diverter system? You must install a diverter system before you drill a conductor or surface hole. The diverter system...

  7. Programmable Positioner For Spot Welding

    NASA Technical Reports Server (NTRS)

    Roden, William A.

    1989-01-01

    Welding station mechanized by installing preset indexing system and gear drive. Mechanism includes a low-cost, versatile, single-axis motion control and motor drive to provide fully-automatic weld sequencing and spot-to-spot spacing. Welding station relieves operator of some difficult, tedious tasks and increases both productivity and quality of welds. Results in welds of higher quality and greater accuracy, fewer weld defects, and faster welding operation.

  8. Meteorological support for space operations: Review and recommendations

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The current meteorological support provided to NASA by NOAA, Air Weather Service, and other contractors is reviewed and suggestions are offered for its improvement. These recommendations include improvement in NASA's internal management organizational structure that would accommodate continued improvement in operational weather support, installation of new observing systems, improvement in analysis and forecasting procedures, and the establishment of an Applied Research and Forecasting Facility.

  9. A New Remote Communications Link to Reduce Residential PV Solar Costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, Randy; Sugiyama, Rod

    Monitoring of PV/DER site production is expensive to install and unreliable. Among third party systems providers, lost communications links are a growing concern. Nearly 20% of links are failing, provisioning is complex, recovery is expensive, production data is lost, and access is fragmented. FleetLink is a new concept in DER system communications, purpose built for lowering the cost of maintaining active contact with residential end user sites and ensuring that production data is reliably available to third party systems providers. Systems providers require accurate, secure system monitoring and reporting of production data and system faults while driving down overall costsmore » to compete effectively. This plug and play, independently operating communications solution lowers the cost of fleet contact from typically .08 dollars-$.12/W down to .02 dollars -.03/W including installation and maintenance expenses. FleetLink establishes a breakthrough in simplicity that facilitates rapid expansion of residential solar by reducing initial capital outlay and lowering installation labor time and skill levels. The solution also facilitates higher DER installation growth rates by driving down maintenance costs and eliminating communications trouble calls. This is accomplished by the FleetLink’s unique network technology that enables dynamic network configuration for fast changes, and active, self-healing DER site contact for uptime assurance. Using an open source network framework with proprietary, application specific enhancements, FleetLink independently manages connectivity, security, recovery, grid control communications, and fleet expansion while presenting a compliant SunSpec interface to the third party operations centers. The net system cost savings of at least .05 dollars/W supports the SunShot cost goals and the flexibility and scalability of the solution accelerates the velocity and ubiquitous adoption of solar.« less

  10. 40 CFR 60.2944 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.2944 Section 60.2944 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator...

  11. Solar-heated swimming school--Wilmington, Delaware

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report describes operation, installation, and performance of solar-energy system which provides alternative to natural gas pool heating. System is comprised of 2,500 square feet of liquid flat-plate collectors connected to 3,600 galloon; gallongalloon storage tank, with microcomputer-based controls. Extension of building incorporates vertical-wall, passive collection system which provides quarter of heated fresh air for office.

  12. Paradigm Paralysis and the Plight of the PC in Education.

    ERIC Educational Resources Information Center

    O'Neil, Mick

    1998-01-01

    Examines the varied factors involved in providing Internet access in K-12 education, including expense, computer installation and maintenance, and security, and explores how the network computer could be useful in this context. Operating systems and servers are discussed. (MSE)

  13. Smoke Detector Technology.

    ERIC Educational Resources Information Center

    Powell, Pamela, Ed.; Portugill, Jestyn, Ed.

    This manual, one in a series developed for public education, provides information on smoke detector selection, installation, operation, and maintenance. For the prospective buyer, the importance of looking for the seal of a recognized national testing laboratory--such as Underwriters' Laboratories, Inc. (UL)--indicating adequate laboratory testing…

  14. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  15. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  16. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  17. 10 CFR 960.5-2-4 - Offsite installations and operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... present projected effects from nearby industrial, transportation, and military installations and..., construction, operation, closure, or decommissioning or can be accommodated by engineering measures and (2...

  18. Crew Access Arm arrival at Mobile Launcher

    NASA Image and Video Library

    2017-11-09

    A heavy-load transport truck carrying the Orion crew access arm arrives at the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  19. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    A heavy-load transport truck carrying the Orion crew access arm passes the Vehicle Assembly Building on its way to the mobile launcher at NASA's Kennedy Space Center in Florida. The access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  20. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-09

    The Orion crew access arm, secured on a stand, is being prepared for its move from a storage location at NASA's Kennedy Space Center in Florida, to the mobile launcher (ML) tower near the Vehicle Assembly Building at the center. The crew access arm will be installed at about the 274-foot level on the tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower.

  1. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    A heavy-load transport truck carrying the Orion crew access arm makes its way toward the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  2. An aircraft Earth station for general aviation

    NASA Technical Reports Server (NTRS)

    Matyas, R.; Boughton, J.; Lyons, R.; Spenler, S.; Rigley, J.

    1990-01-01

    While the focus has been international commercial air traffic, an opportunity exists to provide satellite communications to smaller aircraft. For these users equipment cost and weight critically impact the decision to install satellite communications equipment. Less apparent to the operator is the need for a system infrastructure that will be supported both regionally and internationally and that is compatible with the ground segment being installed for commercial aeronautical satellite communications. A system concept is described as well as a low cost terminal that are intended to satisfy the small aircraft market.

  3. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a manner...

  7. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...

  8. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... hydrogen chloride testing with EPA Method 321 at 40 CFR part 63, appendix A, an owner or operator must install, calibrate, maintain, and operate a CEMS for monitoring hydrogen chloride emissions discharged to...

  9. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  10. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  11. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...

  12. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...

  13. Photovoltaic generating systems in rural schools in Neuquen Province, Argentina

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawand, T.A.; Campbell, J.

    1997-12-01

    During the period 1994-95, solar photovoltaic systems were installed at a number of schools in Neuquen Province, Argentina, by the Provincial electric utility, Ente Provincial de Energia del Neuquen. This was undertaken with funds provided by the Inter-American Development Bank. In all, there are 12 schools that have had photovoltaic generating systems installed. These generating systems are designed to provide electricity for the basic needs at the schools: primarily for lighting, and to operate small electrical appliances such as communication radios, televisions, VCR`s, AM/FM and short-wave radios. They do not provide enough energy to operate large consumption appliances such asmore » washing machines, microwaves, refrigerators, power tools, etc. The program of provision of PV systems was supplemented with training on simple systems for cooking food or drying fruit, etc. These techniques are primarily intended for demonstration at the schools thus serving an educational role with the hope that they will be transmitted in time to the families of the students where the need is manifested the most.« less

  14. Core network infrastructure supporting the VLT at ESO Paranal in Chile

    NASA Astrophysics Data System (ADS)

    Reay, Harold

    2000-06-01

    In October 1997 a number of projects were started at ESO's Paranal Observatory at Cerro Paranal in Chile to upgrade the communications infrastructure in place at the time. The planned upgrades were to internal systems such as computer data networks and telephone installations and also data links connecting Paranal to other ESO sites. This paper details the installation work carried out on the Paranal Core Network (PCN) during the period of October 1997 to December 1999. These installations were to provide both short term solutions to the requirement for reliable high bandwidth network connectivity between Paranal and ESO HQ in Garching, Germany in time for UTI (Antu) first light and perhaps more importantly, to provide the core systems necessary for a site moving towards operational status. This paper explains the reasons for using particular cable types, network topology, and fiber backbone design and implementation. We explain why it was decided to install the PCN in two distinct stages and how equipment used in temporary installations was re-used in the Very Large Telescope networks. Finally we describe the tools used to monitor network and satellite link performance and will discuss whether network backbone bandwidth meets the expected utilization and how this bandwidth can easily be increased in the future should there be a requirement.

  15. Data feature: 1996 world nuclear electricity production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less

  16. Development of a project on North Unit Irrigation District’s Main Canal at the Monroe Drop, using a novel low-head hydropower technology called the SLH100

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schneider, Abraham; Schneider, Gia; McKinstry, Katherine

    Natel Energy is a low­-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-­head, high-­flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state­-of­the-­art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly­-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or abovemore » tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-­friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-­head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.« less

  17. Near-real-time TOMS, telecommunications and meteorological support for the 1987 Airborne Antarctic Ozone Experiment

    NASA Technical Reports Server (NTRS)

    Ardanuy, P.; Victorine, J.; Sechrist, F.; Feiner, A.; Penn, L.

    1988-01-01

    The goal of the 1987 Airborne Antarctic Ozone Experiment was to improve the understanding of the mechanisms involved in the formation of the Antarctic ozone hole. Total ozone data taken by the Nimbus-7 Total Ozone Mapping Spectrometer (TOMS) played a central role in the successful outcome of the experiment. During the experiment, the near-real-time TOMS total ozone observations were supplied within hours of real time to the operations center in Punta Arenas, Chile. The final report summarizes the role which Research and Data Systems (RDS) Corporation played in the support of the experiment. The RDS provided telecommunications to support the science and operations efforts for the Airborne Antarctic Ozone Experiment, and supplied near real-time weather information to ensure flight and crew safety; designed and installed the telecommunications network to link NASA-GSFC, the United Kingdom Meteorological Office (UKMO), Palmer Station, the European Center for Medium-Range Weather Forecasts (ECMWF) to the operation at Punta Arenas; engineered and installed stations and other stand-alone systems to collect data from designated low-orbiting polar satellites and beacons; provided analyses of Nimbus-7 TOMS data and backup data products to Punta Arenas; and provided synoptic meteorological data analysis and reduction.

  18. The Design Fabrication Installation & Evaluation of the Balance Probe Monitor for Large Centrifuges at a National Laboratory Facility.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gallegos, Jonathan Michael

    Balance Probe Monitors were designed, fabricated, installed, and evaluated at Sandia National Laboratories (SNL) for the 22,600 g kg (50,000 g lb) direct drive electromotor driven large centrifuges. These centrifuges provide a high onset/decay rate g environment. The Balance Probe Monitor is physically located near a centrifuge’s Capacitance Probe, a crucial sensor for the centrifuge’s sustainability. The Balance Probe Monitor will validate operability of the centrifuge. Most importantly, it is used for triggering a kill switch under the condition that the centrifuge displacement value exceeds allowed tolerances. During operational conditions, the Capacitance Probe continuously detects the structural displacement of themore » centrifuge and an adjoining AccuMeasure 9000 translates this displacement into an output voltage.« less

  19. Isopropyl alcohol tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  20. Water tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  1. Liquid oxygen tank installed at A-3 Test Stand

    NASA Technical Reports Server (NTRS)

    2009-01-01

    A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  2. Water tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-08-13

    A water tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen water, liquid oxygen (LOX) and isopropyl alcohol (IPA) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  3. Liquid oxygen tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-09-18

    A liquid oxygen (LOX) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen LOX, isopropyl alcohol (IPA) and water tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  4. Isopropyl alcohol tank installed at A-3 Test Stand

    NASA Image and Video Library

    2009-09-18

    An isopropyl alcohol (IPA) tank is lifted into place at the A-3 Test Stand being built at NASA's John C. Stennis Space Center. Fourteen IPA, water and liquid oxygen (LOX) tanks are being installed to support the chemical steam generators to be used on the A-3 Test Stand. The IPA and LOX tanks will provide fuel for the generators. The water will allow the generators to produce steam that will be used to reduce pressure inside the stand's test cell diffuser, enabling operators to simulate altitudes up to 100,000 feet. In that way, operators can perform the tests needed on rocket engines being built to carry humans back to the moon and possibly beyond. The A-3 Test Stand is set for completion and activation in 2011.

  5. Solar hot water system installed at Quality Inn, Key West, Florida

    NASA Astrophysics Data System (ADS)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  6. Solar hot water system installed at Quality Inn, Key West, Florida

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  7. Offshore wind development research (technical brief).

    DOT National Transportation Integrated Search

    2014-04-01

    The study addresses all aspects of Offshore Wind (OSW) development. This includes identifying : vessel types, vessel installation methods, needs and operating characteristics through all phases : of OSW installation, construction, operations and main...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashe, Mary; Chwastyk, Dan; de Monasterio, Caroline

    The 2010 U.S. Lighting Market Characterization is the second report released by the U.S. Department of Energy’s Solid State Lighting Program that provides summary estimates of the installed stock, energy use, and lumen production of all lamps operating in the U.S, the first version being released in 2002.

  9. RELIABILITY TESTING OF AN ON-HARVESTER COTTON WEIGHT MEASUREMENT SYSTEM

    USDA-ARS?s Scientific Manuscript database

    A system for weighing seed cotton onboard stripper harvesters was developed and installed on several producer owned and operated machines. The weight measurement system provides critical information to producers when in the process of calibrating yield monitors or conducting on-farm research. The ...

  10. 48 CFR 237.7601 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... provided by a firm or individual under contract to DoD to support mission-essential functions, such as support of vital systems, including ships owned, leased, or operated in support of military missions or roles at sea; associated support activities, including installation, garrison, and base support services...

  11. 7 CFR 654.17 - Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.17 Inspection. (a) Sponsor(s) are to make periodic and special inspections of installed project measures as provided in the plan of O&M. For structural measures, inspections are to be made at least annually and...

  12. 40 CFR 60.3043 - What operating parameter monitoring equipment must I install, and what operating parameters must...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What operating parameter monitoring equipment must I install, and what operating parameters must I monitor? 60.3043 Section 60.3043 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission...

  13. 40 CFR 610.23 - Operator interaction effects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...

  14. 32 CFR Appendix D to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Marine Corps

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Institution provides instruction via media. (4) When operating on a Marine base, provide library services to the Marine Corps base/installation for students in the form of research and reference materials (e.g... home campus. Services shall also include research and reference material in sufficient quantity to meet...

  15. 32 CFR Appendix D to Part 68 - Addendum for Education Services Between [Name of Educational Institution] and the U.S. Marine Corps

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Institution provides instruction via media. (4) When operating on a Marine base, provide library services to the Marine Corps base/installation for students in the form of research and reference materials (e.g... home campus. Services shall also include research and reference material in sufficient quantity to meet...

  16. 40 CFR 57.503 - Control measures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., installation and proper operation of primary hoods on all active matte tap holes, matte launders, slag skim..., installation and proper operation of primary hoods on all active slag and lead bullion furnace tap holes and...

  17. 40 CFR 265.443 - Design and operating requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., climatic conditions, the stress of installation, and the stress of daily operations, e.g., variable and... pad leakage to which they are exposed, climatic conditions, the stress of installation, and the stress of daily operation (including stresses from vehicular traffic on the drip pad); (ii) Placed upon a...

  18. 40 CFR 265.443 - Design and operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., climatic conditions, the stress of installation, and the stress of daily operations, e.g., variable and... pad leakage to which they are exposed, climatic conditions, the stress of installation, and the stress of daily operation (including stresses from vehicular traffic on the drip pad); (ii) Placed upon a...

  19. 40 CFR 265.443 - Design and operating requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., climatic conditions, the stress of installation, and the stress of daily operations, e.g., variable and... pad leakage to which they are exposed, climatic conditions, the stress of installation, and the stress of daily operation (including stresses from vehicular traffic on the drip pad); (ii) Placed upon a...

  20. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...

  1. Electrician's Mate 3 & 2: Rate Training Manual.

    ERIC Educational Resources Information Center

    Naval Education and Training Command, Pensacola, FL.

    The training manual provides information related to the tasks assigned to the Electrician's Mate Third and Second Class who operate and maintain power and lighting systems and associated equipment. Individual chapters deal with: career challenges for the Electrician's Mate, safety precautions, test equipment, electrical installations, A-C power…

  2. Non-PRASA Drinking Water Research on UV Disinfection in Puerto Rico

    EPA Science Inventory

    The U.S. EPA and InterAmerican University of San German worked with water treatment operators from Patillas, Puerto Rico on the installation, training and testing of pretreatment/UV disinfection systems in the communities of La Sofia and Apeadero. This presentation provides path...

  3. Economically viable biochemical processes for the advanced rural biorefinery and downstream recovery operations

    USDA-ARS?s Scientific Manuscript database

    Rural biorefineries offer an alternative to traditional ethanol production by providing the opportunity to produce fuel on site to reduce costs associated with biomass transportation thus making the fuel economically viable. Widespread installation of rural biorefineries could lead to increased upt...

  4. Solar Energy Installers Curriculum Guides. Book I.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    This first volume of a comprehensive curriculum guide for the heating-ventilation-air conditioning-refrigeration-solar student is designed to assist high school area vocational centers or community college instructors in the implementation and operation of comfort training programs. Following an introductory section, the guide provides job…

  5. 46 CFR 169.685 - Electric heating and cooking equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or... designed as to permit complete cleaning, maintenance, and repair. (c) Doors for electric cooking equipment must be provided with heavy duty hinges and locking devices to prevent accidental opening in heavy seas...

  6. Care and Handling of Computer Magnetic Storage Media.

    ERIC Educational Resources Information Center

    Geller, Sidney B.

    Intended for use by data processing installation managers, operating personnel, and technical staff, this publication provides a comprehensive set of care and handling guidelines for the physical/chemical preservation of computer magnetic storage media--principally computer magnetic tapes--and their stored data. Emphasis is placed on media…

  7. Development of process control capability through the Browns Ferry Integrated Computer System using Reactor Water Clanup System as an example. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.; Mowrey, J.

    1995-12-01

    This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less

  8. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  9. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  10. 40 CFR 63.11624 - What are the notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 63.11621(e) to install and operate a cyclone to control emissions from pelleting operations, the... of the cyclone determined in accordance with § 63.11621(e)(2). (iv) If you own or operate an affected source that is not subject to the requirement in § 63.11621(e) to install and operate a cyclone to...

  11. 40 CFR 63.11624 - What are the notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 63.11621(e) to install and operate a cyclone to control emissions from pelleting operations, the... of the cyclone determined in accordance with § 63.11621(e)(2). (iv) If you own or operate an affected source that is not subject to the requirement in § 63.11621(e) to install and operate a cyclone to...

  12. Numerical study of a novel procedure for installing the tower and Rotor Nacelle Assembly of offshore wind turbines based on the inverted pendulum principle

    NASA Astrophysics Data System (ADS)

    Guachamin Acero, Wilson; Gao, Zhen; Moan, Torgeir

    2017-09-01

    Current installation costs of offshore wind turbines (OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study (based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies (RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel (HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV (in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV (which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting (response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather- and water depth-sensitivity, this novel procedure is demonstrated to be viable.

  13. Testing of Streckeisen STS-5A and Nanometrics Trillium 120PH Sensors for the Alaska Transportable Array

    NASA Astrophysics Data System (ADS)

    Abbasi Baghbadorani, A.; Aderhold, K.; Bloomquist, D.; Frassetto, A.; Miller, P. E.; Busby, R. W.

    2017-12-01

    Starting in 2014, the IRIS Transportable Array facility began to install and operate seismic stations in Alaska and western Canada. By the end of the project, the full deployment of the array will cover a grid of 280 stations spaced about 85 km apart covering all of mainland Alaska and parts of the Yukon, British Columbia, and the Northwest Territories. Approximately 200 stations will be operated directly by IRIS through at least 2019. A key aspect of the Alaska TA is the need for stations to operate autonomously, on account of the high cost of installation and potential subsequent visits to remote field-sites to repair equipment. The TA is using newly developed broadband seismometers Streckeisen STS-5A and Nanometrics Trillium-120PH, designed for installation in shallow posthole emplacements. These new instruments were extensively vetted beforehand, but they are still relatively new to the TA inventory. Here we will assess their performance under deployment conditions and after repeated commercial shipping and travel to the field. Our objective is to provide a thorough accounting of the identified failures of the existing inventory of posthole instruments. We will assess the practices and results of instrument testing by the PASSCAL Instrument Center/Array Operations Facility (PIC/AOF), Alaska Operations Center (AOC), and broadband seismic sensor manufacturers (Streckeisen, Nanometrics) in order to document potential factors in and stages during the process for instrument failures. This will help to quantify the overall reliability of the TA seismic sensors and quality of TA practices and data collection, and identify potential considerations in future TA operations. Our results show that the overall rate of failure of all posthole instruments is <4% out of 260. This is lower than the rates seen for vault sensor failures in the operation of the Lower 48 Transportable Array. For telemetered stations such as these installed in the TA Alaska array, we also show that noise analyses can capture a failed emplaced sensor and reveal improved station performance after sensor replacement, and that these are key elements in assessing whether or not a sensor should be replaced in the field.

  14. PRISM: Processing routines in IDL for spectroscopic measurements (installation manual and user's guide, version 1.0)

    USGS Publications Warehouse

    Kokaly, Raymond F.

    2011-01-01

    This report describes procedures for installing and using the U.S. Geological Survey Processing Routines in IDL for Spectroscopic Measurements (PRISM) software. PRISM provides a framework to conduct spectroscopic analysis of measurements made using laboratory, field, airborne, and space-based spectrometers. Using PRISM functions, the user can compare the spectra of materials of unknown composition with reference spectra of known materials. This spectroscopic analysis allows the composition of the material to be identified and characterized. Among its other functions, PRISM contains routines for the storage of spectra in database files, import/export of ENVI spectral libraries, importation of field spectra, correction of spectra to absolute reflectance, arithmetic operations on spectra, interactive continuum removal and comparison of spectral features, correction of imaging spectrometer data to ground-calibrated reflectance, and identification and mapping of materials using spectral feature-based analysis of reflectance data. This report provides step-by-step instructions for installing the PRISM software and running its functions.

  15. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  16. Installation and operation of a large scale RAPS system in Peru

    NASA Astrophysics Data System (ADS)

    Cole, J. F.

    In 1997, International Lead Zinc Research Organization Inc. (ILZRO), Solar Energy Industries Association (SEIA), and the Ministry of Energy and Mines (MEM) of Peru signed a Memorandum of Understanding to facilitate the installation of hybrid remote area power supply (RAPS) systems in the Amazon region of Peru. Many remote villages in this vast region have either no or limited electricity supplied by diesel generators running a few hours per day. Subsequently, ILZRO sponsored the engineering design of the hybrid RAPS system and SEIA supported a socio-economic study to determine the sustainability of such systems and the locations for pilot installations. In mid-1998, the Peruvian government approved the design of the system. ILZRO then began efforts to obtain governmental and inter-governmental funding to supplement its own funds to underwrite the cost of manufacture and installation of the systems in two villages in the Amazon region. Additional major funding has been received from the Global Environmental Facility (GEF) administered by the United Nations Development Program (UNDP) and from the Common Fund for Commodities (CFC). Funds have also been received from the US Department of Energy, the International Greenhouse Partnership (Australia) and the Peruvian government. The RAPS system consists of modules designed to provide 150 kW h per day of utility grade ac electricity over a 24 h period. Each module contains a diesel generator, battery bank using heavy-duty 2 V VRLA GEL batteries, a battery charger, a photovoltaic array and an ac/dc inverter. The batteries and electrical components are housed in modified shipping containers. The modules can be installed with a new generator or retrofitted to an existing generator. The charging and discharging regime of the batteries has been recommended by a study carried out by CSIRO, which has simulated the RAPS operation. The system will employ a partial-state-of-charge (PSOC) regime in order to optimize the life of the batteries, which have a projected life of 8-10 years. A remote monitoring system will consist of a satellite link between each of the remote area power systems and one or more central hosts. The system operator will be able to obtain actual operational status of the system and will be able to change set points and to force operation of certain functions in order to test the system. Preliminary cost analyses indicate that such RAPS systems are more economically attractive to provide electricity to remote villages than other alternatives, including 24 h diesel generation and grid extension. The past 5 years have provided a number of lessons learned, particularly related to dealing with government agencies in a developing country, overcoming logistical problems such as shipping long distances and dealing with difficult climate and terrain. Despite difficulties encountered, the promise of RAPS systems as a rapidly growing market for lead-acid batteries appears to be bright given the demand for sustainable remote electrification.

  17. Advantages for passengers and cabin crew of operating a gas-phase adsorption air purifier in 11-h simulated flights.

    PubMed

    Strøm-Tejsen, P; Zukowska, D; Fang, L; Space, D R; Wyon, D P

    2008-06-01

    Experiments were carried out in a three-row, 21-seat section of a simulated aircraft cabin installed in a climate chamber to evaluate the extent to which passengers' perception of cabin air quality is affected by the operation of a gas-phase adsorption (GPA) purification unit. A total of 68 subjects, divided into four groups of 17 subjects took part in simulated 11-h flights. Each group experienced four conditions in balanced order, defined by two outside air supply rates (2.4 and 3.3 l/s per person), with and without the GPA purification unit installed in the recirculated air system, a total of 2992 subject-hours of exposure. During each flight the subjects completed questionnaires five times to provide subjective assessments of air quality, cabin environment, intensity of symptoms, and thermal comfort. Additionally, the subjects' visual acuity, finger temperature, skin dryness, and nasal peak flow were measured three times during each flight. Analysis of the subjective assessments showed that operating a GPA unit in the recirculated air provided consistent advantages with no apparent disadvantages. Operating a gas-phase adsorption (GPA) air purifier unit in the recirculated air in a simulated airplane cabin provided a clear and consistent advantage for passengers and crew that became increasingly apparent at longer flight times. This finding indicates that the expense of undertaking duly blinded field trials on revenue flights would be justified.

  18. Performing a scatterv operation on a hierarchical tree network optimized for collective operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D

    Performing a scatterv operation on a hierarchical tree network optimized for collective operations including receiving, by the scatterv module installed on the node, from a nearest neighbor parent above the node a chunk of data having at least a portion of data for the node; maintaining, by the scatterv module installed on the node, the portion of the data for the node; determining, by the scatterv module installed on the node, whether any portions of the data are for a particular nearest neighbor child below the node or one or more other nodes below the particular nearest neighbor child; andmore » sending, by the scatterv module installed on the node, those portions of data to the nearest neighbor child if any portions of the data are for a particular nearest neighbor child below the node or one or more other nodes below the particular nearest neighbor child.« less

  19. Electricity Submetering on the Cheap: Stick-on Electricity Meters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lanzisera, Steven; Lorek, Michael; Pister, Kristofer

    2014-08-17

    We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less

  20. 40 CFR 61.126 - Monitoring of operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...

  1. 40 CFR 61.126 - Monitoring of operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operator of any source subject to this subpart using a wet-scrubbing emission control device shall install... manufacturer to be accurate within ±250 pascal (±1 inch of water). The owner or operator of any source subject to this subpart using a wet-scrubbing emission control device shall also install, calibrate, maintain...

  2. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  3. Operational requirements for flight control and navigation systems for short haul transport aircraft

    NASA Technical Reports Server (NTRS)

    Morrison, J. A.

    1978-01-01

    To provide a background for evaluating advanced STOL systems concepts, a number of short haul and STOL airline operations in the United States and one operation in Canada were studied. A study of flight director operational procedures for an advanced STOL research airplane, the Augmented Wing Jet STOL Research Airplane, was conducted using the STOLAND simulation facility located at the Ames Changes to the advanced digital flight control system (STOLAND) installed in the Augmentor Wing Airplane are proposed to improve the mode sequencing to simplify pilot procedures and reduce pilot workload.

  4. The Evaluation of Feasibility of Thermal Energy Storage System at Riga TPP-2

    NASA Astrophysics Data System (ADS)

    Ivanova, P.; Linkevics, O.; Cers, A.

    2015-12-01

    The installation of thermal energy storage system (TES) provides the optimisation of energy source, energy security supply, power plant operation and energy production flexibility. The aim of the present research is to evaluate the feasibility of thermal energy system installation at Riga TPP-2. The six modes were investigated: four for non-heating periods and two for heating periods. Different research methods were used: data statistic processing, data analysis, analogy, forecasting, financial method and correlation and regression method. In the end, the best mode was chosen - the increase of cogeneration unit efficiency during the summer.

  5. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-09

    The Orion crew access arm is secured in a storage location at NASA's Kennedy Space Center in Florida. The access arm will be prepared for its move to the mobile launcher (ML) tower near the Vehicle Assembly Building at the center. The crew access arm will be installed at about the 274-foot level on the tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower.

  6. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    The Orion crew access arm is secured on a flatbed transporter for its move from a storage location at NASA's Kennedy Space Center in Florida to the mobile launcher (ML) tower near the Vehicle Assembly Building at the center. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  7. Orion EM-1 Crew Module Adapter Move to Clean Room

    NASA Image and Video Library

    2016-11-29

    Inside the Neil Armstrong Operations and Checkout Building high bay at NASA’s Kennedy Space Center in Florida, a protective cover is installed around the Orion crew module adapter (CMA) for Exploration Mission 1 (EM-1) for its move to a clean room. The CMA will undergo propellant and environmental control and life support system tube installation and welding. The adapter will connect the Orion crew module to the European Space Agency-provided service module. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission, in late 2018.

  8. Global Positioning System (GPS): Current status and possible nursery uses

    Treesearch

    Dick Karsky

    2002-01-01

    The GPS (Global Positioning System) is a worldwide satellite-positioning system that was funded, installed, and continues to be operated by the U.S. Department of Defense. The navigation signals are provided free and can be used by anyone who has the equipment necessary to receive them.

  9. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...

  10. Automated System Marketplace 1987: Maturity and Competition.

    ERIC Educational Resources Information Center

    Walton, Robert A.; Bridge, Frank R.

    1988-01-01

    This annual review of the library automation marketplace presents profiles of 15 major library automation firms and looks at emerging trends. Seventeen charts and tables provide data on market shares, number and size of installations, hardware availability, operating systems, and interfaces. A directory of 49 automation sources is included. (MES)

  11. 77 FR 48202 - Petition for Exemption; Summary of Petition Received

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... information you provide. Using the search function of our docket Web site, anyone can find and read the....1309(c) and (d). Description of Relief Sought: Gulfstream requests relief from certain engine installation, operational limitation and engine indication requirements which apply to the Gulfstream G280...

  12. Arctic Engineering--Through Human Eyes.

    ERIC Educational Resources Information Center

    Simmonds, W. H. C.

    Adopting technology to people and examining projects through the eyes of those concerned are two ways new technology and engineering can be installed and successfully operated under the adverse conditions of northern Canada and in the face of predicted labor shortages in the 1980's. Adopting a more flexible technology provides the opportunity for…

  13. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with... owners manual. Following the electronic calibration, you must conduct a temperature sensor validation check in which a second or redundant temperature sensor placed nearby the process temperature sensor...

  14. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...

  15. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...

  16. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...

  17. Child Development Services: Army Regulation 608-10 (Effective 15 October 1983).

    ERIC Educational Resources Information Center

    Department of the Army, Washington, DC.

    As of October 15, 1983, Army Regulation 608-10 has prescribed policies, procedures, and standards for establishing and operating Child Development Services (CDS), formerly Child Support Services, at Army installations. The regulation applies to all activities, contractors, individuals, and private organizations providing child care services for…

  18. 46 CFR 56.20-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... accordance with § 56.60-1 of this part. (2) Valves must be designed so that the maximum allowable working... permits this; (ii) Subjecting a representative model to a proof test or experimental stress analysis... uncontrollable rise in pressure can result, means must be provided in the design, installation, and operation of...

  19. 29 CFR 1926.406 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... disconnecting means shall not be less than the supply conductor ampacity. (d) X-Ray equipment—(1) Disconnecting... means shall be operable from a location readily accessible from the X-ray control. For equipment... provide equivalent access. (4) Grounding. All exposed metal parts of cranes, monorail hoists, hoists and...

  20. 29 CFR 1926.406 - Specific purpose equipment and installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... disconnecting means shall not be less than the supply conductor ampacity. (d) X-Ray equipment—(1) Disconnecting... means shall be operable from a location readily accessible from the X-ray control. For equipment... provide equivalent access. (4) Grounding. All exposed metal parts of cranes, monorail hoists, hoists and...

  1. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  2. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  3. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  4. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  5. 46 CFR 169.676 - Grounded electrical systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Grounded electrical systems. 169.676 Section 169.676... Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.676 Grounded electrical systems. (a) Except as provided in paragraph (b...

  6. Telelearning for Extension Agents: The Virginia Experience.

    ERIC Educational Resources Information Center

    Murphy, William F., Jr.

    The creation of the Virginia Tech Teleport Facility and the installation of a nine-meter (diameter) C-Band satellite uplink antenna provided the initial impetus for the Virginia Cooperative Extension Service (VCES) to explore the use of satellite technology for information and program delivery. The $600,000 uplink became operational in September…

  7. Avionics Instrument Systems Specialist Career Ladder: AFSCs 32531, 32551, 31571, and 32591. Occupational Survey Report.

    ERIC Educational Resources Information Center

    Air Force Occupational Measurement Center, Lackland AFB, TX.

    The Avionics Instrument Systems career ladder (AFSC 325X1) provides flight line and shop maintenance training on aircraft instrument systems, electromechancial instruments, components, and test equipment. Duties involve inspecting, removing, installing, repairing, operating, troubleshooting, overhauling, and modifying systems such as flight and…

  8. 14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...

  9. 14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...

  10. 14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...

  11. 14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...

  12. 14 CFR 121.325 - Instruments and equipment for operations under IFR or over-the-top.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... preventing malfunctioning due to icing. (b) A sensitive altimeter. (c) Instrument lights providing enough light to make each required instrument, switch, or similar instrument, easily readable and so installed that the direct rays are shielded from the flight crewmembers' eyes and that no objectionable...

  13. A practical solar energy heating and cooling system

    NASA Technical Reports Server (NTRS)

    Oneill, M. J.; Mcdanal, A. J.; Sims, W. H.

    1973-01-01

    Recent study has concluded that solar-powered residential heating and cooling system is non technically and economically feasible. Proposed system provides space heating, air conditioning, and hot water. Installation costs will be greater than for conventional heating systems, but this difference will eventually be defrayed by very low operating costs.

  14. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  15. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  16. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  17. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  18. 40 CFR 63.8688 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following: (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a noncryogenic temperature range, use a temperature sensor with a minimum measurement sensitivity... output; or (iii) By comparing the sensor output to the output from a calibrated temperature measurement...

  19. 14 CFR 121.279 - Control of engine rotation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Control of engine rotation. 121.279 Section... REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Special Airworthiness Requirements § 121.279 Control... case of turbine engine installations, a means of stopping the rotation need be provided only if the...

  20. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false In-building radiation systems. 22.383 Section... radiation systems. Licensees may install and operate in-building radiation systems without applying for authorization or notifying the FCC, provided that the locations of the in-building radiation systems are within...

  1. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false In-building radiation systems. 22.383 Section... radiation systems. Licensees may install and operate in-building radiation systems without applying for authorization or notifying the FCC, provided that the locations of the in-building radiation systems are within...

  2. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false In-building radiation systems. 22.383 Section... radiation systems. Licensees may install and operate in-building radiation systems without applying for authorization or notifying the FCC, provided that the locations of the in-building radiation systems are within...

  3. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false In-building radiation systems. 22.383 Section... radiation systems. Licensees may install and operate in-building radiation systems without applying for authorization or notifying the FCC, provided that the locations of the in-building radiation systems are within...

  4. KSC-98pc774

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- Sgt. Mark Hines, of Kennedy Space Center (KSC) Security, checks out equipment used to operate the Forward Looking Infrared Radar (FLIR) installed on NASA's Huey UH-1 helicopter. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter

  5. KSC-98pc775

    NASA Image and Video Library

    1998-06-25

    KENNEDY SPACE CENTER, FLA. -- NASA's Huey UH-1 helicopter lands at the Shuttle Landing Facility to pick up Kennedy Space Center (KSC) Security personnel who operate the Forward Looking Infrared Radar (FLIR) installed on board. The helicopter has also been outfitted with a portable global positioning satellite (GPS) system to support Florida's Division of Forestry as they fight the brush fires which have been plaguing the state as a result of extremely dry conditions and lightning storms. The FLIR includes a beach ball-sized infrared camera that is mounted on the helicopter's right siderail and a real-time television monitor and recorder installed inside. While the FLIR collects temperature data and images, the GPS system provides the exact coordinates of the fires being observed and transmits the data to the firefighters on the ground. KSC's security team routinely uses the FLIR equipment prior to Shuttle launch and landing activities to ensure that the area surrounding the launch pad and runway are clear of unauthorized personnel. KSC's Base Operations Contractor, EG&G Florida, operates the NASA-owned helicopter

  6. Monte Carlo Simulation Tool Installation and Operation Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aguayo Navarrete, Estanislao; Ankney, Austin S.; Berguson, Timothy J.

    2013-09-02

    This document provides information on software and procedures for Monte Carlo simulations based on the Geant4 toolkit, the ROOT data analysis software and the CRY cosmic ray library. These tools have been chosen for its application to shield design and activation studies as part of the simulation task for the Majorana Collaboration. This document includes instructions for installation, operation and modification of the simulation code in a high cyber-security computing environment, such as the Pacific Northwest National Laboratory network. It is intended as a living document, and will be periodically updated. It is a starting point for information collection bymore » an experimenter, and is not the definitive source. Users should consult with one of the authors for guidance on how to find the most current information for their needs.« less

  7. Design of a steganographic virtual operating system

    NASA Astrophysics Data System (ADS)

    Ashendorf, Elan; Craver, Scott

    2015-03-01

    A steganographic file system is a secure file system whose very existence on a disk is concealed. Customarily, these systems hide an encrypted volume within unused disk blocks, slack space, or atop conventional encrypted volumes. These file systems are far from undetectable, however: aside from their ciphertext footprint, they require a software or driver installation whose presence can attract attention and then targeted surveillance. We describe a new steganographic operating environment that requires no visible software installation, launching instead from a concealed bootstrap program that can be extracted and invoked with a chain of common Unix commands. Our system conceals its payload within innocuous files that typically contain high-entropy data, producing a footprint that is far less conspicuous than existing methods. The system uses a local web server to provide a file system, user interface and applications through a web architecture.

  8. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  9. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  10. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  11. Flat-plate solar collector - installation package

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  12. AEMS implementation cost study for Boeing 727

    NASA Technical Reports Server (NTRS)

    Allison, R. L.

    1977-01-01

    Costs for airline operational implementation of a NASA-developed approach energy management system (AEMS) concept, as applied to the 727 airplane, were determined. Estimated costs are provided for airplane retrofit and for installation of the required DME ground stations. Operational costs and fuel cost savings are presented in a cost-of-ownership study. The potential return on the equipment investment is evaluated using a net present value method. Scheduled 727 traffic and existing VASI, ILS, and collocated DME ground station facilities are summarized for domestic airports used by 727 operators.

  13. Operation of GRETINA at NSCL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sherrill, Bradley; Gade, Alexandra

    This proposal funded the continued operation of the Gamma-ray Energy tracking Array GRETINA as a user device at the National Superconducting Cyclotron Laboratory (NSCL) at Michigan State University. This was a continuation and covered the operation from January 1, 2017 to December 31, 2017. Twenty-three experiments were completed with GRETINA at NSCL. GRETINA was installed at the reaction target position of the high-resolution, large-acceptance S800 spectrograph and the program started on October 15, 2017. The campaign capitalized on the opportunities provided by NSCL’s energetic rare isotope beams produced by projectile fragmentation.

  14. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  15. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  16. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  17. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  18. Hot tap thermowell installation

    NASA Technical Reports Server (NTRS)

    Romero, C. A.

    1971-01-01

    System permits valve housings or other fillings to be installed in live steam lines or water pipes without interrupting their operation, thus eliminating current tapping restrictions. Two basic assemblies for installation under pressure are described.

  19. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...

  20. Enhancing orbital servicing operations: Providing positive and effective management of spare and installed hardware - A case study of the Hubble Space Telescope

    NASA Technical Reports Server (NTRS)

    Randolph, Joseph L.; Shepard, Kenneth E.

    1990-01-01

    The Satellite Resources Management and Tracking System was developed specifically for the Hubble Space Telescope (HST) program, and now, NASA has the ability to immediately access the necessary data for planning successful orbital satellite servicing operations. This system is an online, real-time data base system that contains a plethora of data on each item identified to support the HST throughout its planned 15 year life. Some of the information provided includes the current status, location, quantity, and history of each asset, a separate record for each discrete serial numbered item, procurement lead times on items sensitive to technology obsolescence, and the maintenance and repair history of each asset. Finally, details are provided on organizational, operational and logistics requirements.

  1. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenbauer, Ben; Bohac, Dave; McAlpine, Jack

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called "combi" systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loadsmore » for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.« less

  2. Retrofitting Forced Air Combi Systems: A Cold Climate Field Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoenbauer, Ben; Bohac, Dave; McAlpine, Jake

    This project analyzed combined condensing water heaters or boilers and hydronic air coils to provide high efficiency domestic hot water (DHW) and forced air space heating. Called 'combi' systems, they provided similar space and water heating performance less expensively than installing two condensing appliances. The system's installed costs were cheaper than installing a condensing furnace and either a condensing tankless or condensing storage water heater. However, combi costs must mature and be reduced before they are competitive with a condensing furnace and power vented water heater (energy factor of 0.60). Better insulation and tighter envelopes are reducing space heating loadsmore » for new and existing homes. For many homes, decreased space heating loads make it possible for both space and domestic water heating loads to be provided with a single heating plant. These systems can also eliminate safety issues associated with natural draft appliances through the use of one common sealed combustion vent. The combined space and water heating approach was not a new idea. Past systems have used non-condensing heating plants, which limited their usefulness in climates with high heating loads. Previous laboratory work (Schoenbauer et al. 2012a) showed that proper installation was necessary to achieve condensing with high efficiency appliances. Careful consideration was paid to proper system sizing and minimizing the water temperature returning from the air handling unit to facilitate condensing operation.« less

  3. Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ardani, Kristen; O'Shaughnessy, Eric; Fu, Ran

    2016-12-01

    In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quartermore » of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.« less

  4. 40 CFR 63.1383 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manufacturing facility must prepare for each glass-melting furnace, rotary spin manufacturing line, and flame... glass-melting furnace, the owner or operator shall install, calibrate, maintain, and continuously... monitors. (v) A triboelectric bag leak detection system shall be installed, operated, adjusted, and...

  5. Possibility of heat recovery from gray water in residential building

    NASA Astrophysics Data System (ADS)

    Mazur, Aleksandra; Słyś, Daniel

    2017-12-01

    Recovery of waste heat from gray water can be an interesting alternative to other energy saving systems in a building, including alternative energy sources. Mainly, due to a number of advantages including independence from weather conditions, small investment outlay, lack of user support, or a slight interference with the installation system. The purpose of this article is to present the financial effectiveness of installations which provide hot, usable water to a detached house, using a Drain Water Heat Recovery (DWHR) system depending on the number of system users and the various combinations of bathing time in the shower, which has an influence on the daily warm water demand in each of the considered options. The economic analysis of the adopted installation variants is based on the Life Cycle Cost (LCC) method, which is characterized by the fact that it also includes the operating costs in addition to the capital expenditure during the entire analysis period. For each case, the necessary devices were selected and the cost of their installation was estimated.

  6. Nacelle Aerodynamic and Inertial Loads (NAIL) project

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A flight test survey of pressures measured on wing, pylon, and nacelle surfaces and of the operating loads on Boeing 747/Pratt & Whitney JT9D-7A nacelles was made to provide information on airflow patterns surrounding the propulsion system installations and to clarify processes responsible for inservice deterioration of fuel economy. Airloads at takeoff rotation were found to be larger than at any other normal service condition because of the combined effects of high angle of attack and high engine airflow. Inertial loads were smaller than previous estimates indicated. A procedure is given for estimating inlet airloads at low speeds and high angles of attack for any underwing high bypass ratio turbofan installation approximately resembling the one tested. Flight procedure modifications are suggested that may result in better fuel economy retention in service. Pressures were recorded on the core cowls and pylons of both engine installations and on adjacent wing surfaces for use in development of computer codes for analysis of installed propulsion system aerodynamic drag interference effects.

  7. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  8. Soviet Post-Strike Civil Defense Rescue, Damage-Limiting, Repair and Restoration Operations.

    DTIC Science & Technology

    1982-08-01

    a temporary pipe system laid on the surface of the ground.- Power to pumping stations at undamaged wells or along the pipelines may be provided from...raw materials from severely damaged installations, will be salvaged and possibly used to set up new production lines in different locations. The repair...protect the economy to ensure its "stable" operation in wartime. Despite obvious differences between the U.S. and Soviet political, administrative

  9. 25th anniversary article: Rise to power--OPV-based solar parks.

    PubMed

    Krebs, Frederik C; Espinosa, Nieves; Hösel, Markus; Søndergaard, Roar R; Jørgensen, Mikkel

    2014-01-08

    A solar park based on polymer solar cells is described and analyzed with respect to performance, practicality, installation speed, and energy payback time. It is found that a high voltage installation where solar cells are all printed in series enables an installation rate in Watts installed per minute that far exceed any other PV technology in existence. The energy payback time for the practical installation of polymer solar cell foil on a wooden 250 square meter platform in its present form is 277 days when operated in Denmark and 180 days when operated in southern Spain. The installation and de-installation rate is above 100 m min⁻¹, which, with the present performance and web width, implies installation of >200 W min⁻¹. In comparison, this also exceeds the overall manufacturing speed of the polymer solar cell foil with a width of 305 mm which is currently 1 m min⁻¹ for complete encapsulated and tested foil. It is also significant that simultaneous installation and de-installation which enables efficient schemes for decommissioning and recycling is possible. It is highlighted where research efforts should most rationally be invested in order to make grid electricity from OPV a reality (and it is within reach).

  10. 14 CFR 23.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 23.1301 Section... Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function. (b) Be labeled as to its identification, function, or operating limitations...

  11. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  12. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  13. Fabrication of a glycerol from CO2 reaction system, supplement

    NASA Technical Reports Server (NTRS)

    Weiss, A. H.

    1973-01-01

    The fabrication, installation, and testing of a glycerol hydrogenation and a CO2 hydrogenation - CH4 partial oxidation units are reported. The glycerol system proved to be operational while the CO2 system was installed but not bought on operational steam.

  14. Overview of Opportunities for Co-Location of Solar Energy Technologies and Vegetation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macknick, Jordan; Beatty, Brenda; Hill, Graham

    2013-12-01

    Large-scale solar facilities have the potential to contribute significantly to national electricity production. Many solar installations are large-scale or utility-scale, with a capacity over 1 MW and connected directly to the electric grid. Large-scale solar facilities offer an opportunity to achieve economies of scale in solar deployment, yet there have been concerns about the amount of land required for solar projects and the impact of solar projects on local habitat. During the site preparation phase for utility-scale solar facilities, developers often grade land and remove all vegetation to minimize installation and operational costs, prevent plants from shading panels, and minimizemore » potential fire or wildlife risks. However, the common site preparation practice of removing vegetation can be avoided in certain circumstances, and there have been successful examples where solar facilities have been co-located with agricultural operations or have native vegetation growing beneath the panels. In this study we outline some of the impacts that large-scale solar facilities can have on the local environment, provide examples of installations where impacts have been minimized through co-location with vegetation, characterize the types of co-location, and give an overview of the potential benefits from co-location of solar energy projects and vegetation. The varieties of co-location can be replicated or modified for site-specific use at other solar energy installations around the world. We conclude with opportunities to improve upon our understanding of ways to reduce the environmental impacts of large-scale solar installations.« less

  15. Development of a microcomputer data base of manufacturing, installation, and operating experience for the NSSS designer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borchers, W.A.; Markowski, E.S.

    1986-01-01

    Future nuclear steam supply systems (NSSSs) will be designed in an environment of powerful micro hardware and software and these systems will be linked by local area networks (LAN). With such systems, individual NSSS designers and design groups will establish and maintain local data bases to replace existing manual files and data sources. One such effort of this type in Combustion Engineering's (C-E's) NSSS engineering organization is the establishment of a data base of historical manufacturing, installation, and operating experience to provide designers with information to improve on current designs and practices. In contrast to large mainframe or minicomputer datamore » bases, which compile industry-wide data, the data base described here is implemented on a microcomputer, is design specific, and contains a level of detail that is of interest to system and component designers. DBASE III, a popular microcomputer data base management software package, is used. In addition to the immediate benefits provided by the data base, the development itself provided a vehicle for identifying procedural and control aspects that need to be addressed in the environment of local microcomputer data bases. This paper describes the data base and provides some observations on the development, use, and control of local microcomputer data bases in a design organization.« less

  16. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  17. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaltash, Abdolreza

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, andmore » Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.« less

  18. TDRS multimode transponder program. Phase 1: Design

    NASA Technical Reports Server (NTRS)

    Cnossen, R. S.

    1972-01-01

    The use of geosynchronous tracking and data relay satellites (TDRS) which can serve both low data rate users at VHF and high data rate users at other frequencies is considered. The effects of radio frequency interference from the earth and of multipath propagation due to reflections from the earth are expected to pose problems for the TDRS system at VHF. Investigations suggest several modulation techniques that offer promise to overcome these problems. This report provides a complete design of a VHF/UHF multimode transponder and its associated ground support equipment. The transponder is designed for installation aboard an aircraft and will demonstrate candidate modulation techniques to provide the required information for the design of an eventual VHF/UHF transponder suitable for installation in a user satellite, capable of operating as part of a TDRS system.

  19. Solar heating and hot water system installed at Southeast of Saline, Unified School District 306, Mentor, Kansas

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar system, installed in a new building, was designed to provide 52 percent of the estimated annual space heating load and 84 percent of the estimated annual potable hot water requirement. The liquid flat plate collectors are ground-mounted and cover a total area of 5125 square feet. The system will provide supplemental heat for the school's closed-loop water-to-air heat pump system and domestic hot water. The storage medium is water inside steel tanks with a capacity of 11,828 gallons for space heating and 1,600 gallons for domestic hot water. The solar heating facility is described and drawings are presented of the completed system which was declared operational in September 1978, and has functioned successfully since.

  20. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraphs (a) and (b)(1) through (8) of this section. (1) Locate the temperature sensor in a position that provides a representative temperature. (2) For a non-cryogenic temperature range, use a temperature sensor... value, whichever is larger. (3) For a cryogenic temperature range, use a temperature sensor with a...

  1. 75 FR 48726 - Notice of Lodging of Consent Decree Under the Resource Conservation and Recovery Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ... single production facility in Plant City, Florida that has been in operation at the current approximate 3... settlement, CFI has re-engineered its plant to cease generating hazardous wastewater previously commingled... reduction program; install synthetic protective barriers beneath its production plants; provide $163.5...

  2. Modular Biopower System Providing Combined Heat and Power for DoD Installations

    DTIC Science & Technology

    2013-12-01

    Cycle Cost evaluation using the experimental results of the 6-month field demonstration and the system’s projected cost and performance for the...34 5.6 SAMPLING RESULTS ...premises, which resulted in a significant program delay. After a short period of operation, the custom-designed engine developed mechanical

  3. Construction Electrician 3 & 2. Rate Training Manual and Nonresident Career Course.

    ERIC Educational Resources Information Center

    Naval Education and Training Command, Pensacola, FL.

    One of a series of training manuals prepared for enlisted personnel in the Navy and Naval Reserve, this self-study package provides subject matter that relates directly to the tasks required of the Construction Electrician, which include abilities to install, operate, service, and overhaul electric generating and distribution systems and wire…

  4. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  5. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of 4 degrees Fahrenheit or 0.75 percent of the temperature value, whichever is larger. (iii) Shield the temperature sensor system from electromagnetic interference...

  6. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement sensitivity of 4 degrees Fahrenheit or 0.75 percent of the temperature value, whichever is larger. (iii) Shield the temperature sensor system from electromagnetic interference...

  7. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements in paragraphs (c)(3)(i) through (vii) of this section. (i) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement...) Shield the temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If...

  8. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  9. 40 CFR 63.2269 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Locate the temperature sensor in a position that provides a representative temperature. (2) Use a temperature sensor with a minimum accuracy of 4 °F or 0.75 percent of the temperature value, whichever is... manufacturer's owners manual. Following the electronic calibration, you must conduct a temperature sensor...

  10. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements in paragraphs (c)(3)(i) through (vii) of this section. (i) Locate the temperature sensor in a position that provides a representative temperature. (ii) Use a temperature sensor with a measurement...) Shield the temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If...

  11. 46 CFR 183.390 - Shore power.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Shore power. 183.390 Section 183.390 Shipping COAST...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.390 Shore power. A vessel with an electrical system operating at more than 50 volts, which is provided with a means to connect to shore power...

  12. TDRSS multimode transponder program S-band modification

    NASA Technical Reports Server (NTRS)

    Mackey, J. E.

    1975-01-01

    The S-Band TDRS multimode transponder and its associated ground support equipment is described. The transponder demonstrates candidate modulation techniques to provide the required information for the design of an eventual S-band transponder suitable for installation in a user satellite, capable of operating as part of a Tracking and Data Relay Satellite (TDRS) system.

  13. Borehole Data Package for One CY 2005 CERCLA Well 699-S20-E10, 300-FF-5 Operable Unit, Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Bruce A.; Bjornstad, Bruce N.; Lanigan, David C.

    2006-03-29

    This report supplies the information obtained during drilling, characterization, and installation of the new groundwater monitoring well. This document also provides a compilation of hydrogeologic and well construction information obtained during drilling, well development, and sample collection/analysis activities.

  14. 14 CFR 121.344 - Digital flight data recorders for transport category airplanes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...

  15. 14 CFR 121.344 - Digital flight data recorders for transport category airplanes.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...

  16. 14 CFR 121.344 - Digital flight data recorders for transport category airplanes.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...

  17. 14 CFR 121.344 - Digital flight data recorders for transport category airplanes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...

  18. 14 CFR 121.344 - Digital flight data recorders for transport category airplanes.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... as provided in paragraph (l) of this section, no person may operate under this part a turbine-engine... (when an information source is installed); (38) Wind speed and direction (when an information source is... rudder valve status. (b) For all turbine-engine powered transport category airplanes manufactured on or...

  19. Continuous turbidity monitoring in streams of northwestern California

    Treesearch

    Rand Eads; Jack Lewis

    2002-01-01

    Abstract - Redwood Sciences Laboratory, a field office of the USDA Forest Service, Pacific Southwest Research Station has developed and refined methods and instrumentation to monitor turbidity and suspended sediment in streams of northern California since 1996. Currently we operate 21 stations and have provided assistance in the installation of 6 gaging stations for...

  20. How to use the Stand-Damage Model: Version 2.0. (Computer program)

    Treesearch

    J.J. Colbert; George Racin

    2001-01-01

    The Stand-Damage Model simulates the growth of a forest stand, a spatially homogeneous collection of trees growing on a site. The model simulates growth from an initial inventory, user-prescribed management practices, and the effects of gypsy moth defoliation. Here we provide installation and operating instructions for Version 2.0.

  1. Independent technical support for the frozen soil barrier installation and operation at the Fukushima Daiichi Nuclear Power Station (F1 Site)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, Brian B.; Jackson, Dennis G.; Truex, Michael J.

    TEPCO is implementing a number of water countermeasures to limit the releases and impacts of contaminated water to the surrounding environment. The diverse countermeasures work together in an integrated manner to provide different types, and several levels, of protection. In general, the strategy represents a comprehensive example of a “defense in depth” concept that is used for nuclear facilities around the world. One of the key countermeasures is a frozen soil barrier encircling the damaged reactor facilities. The frozen barrier is intended to limit the flow of water into the area and provide TEPCO the ability to reduce the amountmore » of contaminated water that requires treatment and storage. The National Laboratory team supports the selection of artificial ground freezing and the incorporation of the frozen soil barrier in the contaminated water countermeasures -- the technical characteristics of a frozen barrier are relatively well suited to the Fukushima-specific conditions and the need for inflow reduction. Further, our independent review generally supports the TEPCO/Kajima design, installation strategy and operation plan.« less

  2. Field experience with aquifer thermal energy storage

    NASA Astrophysics Data System (ADS)

    Kannberg, L. D.

    1987-11-01

    Aquifer thermal energy storage (ATES) has the potential to provide storage for large-scale building heating and cooling at many sites in the US. However, implementation requires careful attention to site geohydraulic and geochemical characteristics. Field tests in the US have shown the over 60% of the heat injected at temperatures over 100 C can be recovered on a seasonal cycle. Similarly, aquifer storage of shilled ground water can provide building cooling with annual cooling electrical energy reductions of over 50% and a reduction in summer peak cooling electrical usage by as much as a factor of 20. A number of projects have been built and operated around the world. China has installed numerous ATES systems in many major cities. Installations in Europe and Scandinavia are almost exclusively low-temperature heat storage systems that use heat pumps. Two high-temperature systems (over 100 C) are in operation or undergoing preliminary testing: one in Denmark, the other in France. Heat ATES often requires water treatment to prevent precipitation of calcium and magnesium carbonates. At some sites, consideration of other geochemical and microbiological issues (such as iron bacteria) must be resolved.

  3. LANSCE harp upgrade: analysis, design, fabrication and installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilpatrick, John D; Chacon, Phillip; Martinez, Derwin

    2010-01-01

    The primary goal of this newly installed beam profile measurement is to provide the facility operators and physicists with a reliable horizontal and vertical projected beam distribution and location with respect to the proton beam target and beam aperture. During a 3000-hour annual run cycle, 5 {mu}C of charge is delivered every 50 milliseconds through this harp to the downstream TRMS Mark III target. The resulting radioactive annual dose near this harp is at least 6 MGy. Because of this harsh environment, the new harp design has been further optimized for robustness. For example, compared to an earlier design, thismore » harp has half of the sensing wires and utilizes only a single bias plane. The sensing fibers are 0.079-mm diameter SiC fibers. To hold these fibers to a rigid ceramic structure, a collet fiber-clamping device accomplishes the three goals of maintaining a mechanical fiber clamp, holding the sense fibers under a slight tensile force, and providing a sense-fiber electrical connection. This paper describes the harp analysis and design, and provides fabrication, assembly, and some installation information, and discusses wiring alterations.« less

  4. GOES data-collection system instrumentation, installation, and maintenance manual

    USGS Publications Warehouse

    Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.

    1986-01-01

    The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)

  5. Overview of the experimental tests in prototype

    NASA Astrophysics Data System (ADS)

    Egusquiza, Eduard; Valentín, David; Presas, Alexandre; Valero, Carme

    2017-04-01

    Experimental tests in prototype are necessary to understand the dynamic behaviour of the machine during different operating points. Hydraulic phenomena as well as its effect on the structure need to be studied in order to avoid instabilities during operation and to extend the life-time of the different components. For this purpose, a complete experimental study of a large Francis turbine prototype has been performed installing several sensors along the machine. Pressure sensors were installed in the penstock, spiral case, runner and draft tube, strain gauges were installed in the runner, vibration sensors were used in the stationary parts and different electrical and operational parameters were also measured. All these signals were acquired simultaneously for different operating points of the turbine.

  6. 14 CFR 25.1521 - Powerplant limitations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operation due to the design of the installation or to another established limitation. (c) Turbine engine installations. Operating limitations relating to the following must be established for turbine engine... section must be established so that they do not exceed the corresponding limits for which the engines or...

  7. 14 CFR 25.1521 - Powerplant limitations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operation due to the design of the installation or to another established limitation. (c) Turbine engine installations. Operating limitations relating to the following must be established for turbine engine... section must be established so that they do not exceed the corresponding limits for which the engines or...

  8. 14 CFR 25.1521 - Powerplant limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operation due to the design of the installation or to another established limitation. (c) Turbine engine installations. Operating limitations relating to the following must be established for turbine engine... section must be established so that they do not exceed the corresponding limits for which the engines or...

  9. 14 CFR 25.1521 - Powerplant limitations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operation due to the design of the installation or to another established limitation. (c) Turbine engine installations. Operating limitations relating to the following must be established for turbine engine... section must be established so that they do not exceed the corresponding limits for which the engines or...

  10. Performance and Health Test Procedure for Grid Energy Storage Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali M; Smith, Kandler A; Friedl, Andrew

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with littlemore » modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.« less

  11. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    Preparations are underway to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  12. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket high above the transfer aisle inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up for transfer into High Bay 3 for installation. The platform will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  13. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  14. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up and over the transfer aisle and will be lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  15. Elimination of voltage reversal in multiple membrane electrode assembly installed microbial fuel cells (mMEA-MFCs) stacking system by resistor control.

    PubMed

    Kim, Bongkyu; Chang, In Seop

    2018-08-01

    Voltage reversal (VR) in series connection of multiple membrane electrode assembly installed microbial fuel cells (mMEA-MFC) is eliminated by manipulating the resistor control. Discharge test results collected from two mMEA-MFCs initially operated (designated as P1 and P2) confirm that the performance of P2 exceeds that of P1. Thus, driving P1 and P2 as serially stacked MFCs generate the VR in P1. Controlling the inserted resistor adjust the current production of P2 to maintain balance with P1, and the VR in P1 is eliminated in the operation of stacking mode. Thus, manipulating the internal resistance provide an applicable approach to suppress VR in the stacking of mMEA-MFCs system. Copyright © 2018 Elsevier Ltd. All rights reserved.

  16. Load drop evaluation for TWRS FSAR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Julyk, L.J.; Ralston, G.L.

    1996-09-30

    Operational or remediation activities associated with existing underground high-level waste storage tank structures at the Hanford Site often require the installation/removal of various equipment items. To gain tank access for installation or removal of this equipment, large concrete cover blocks must be removed and reinstalled in existing concrete pits above the tanks. An accidental drop of the equipment or cover blocks while being moved over the tanks that results in the release of contaminants to the air poses a potential risk to onsite workers or to the offsite public. To minimize this potential risk, the use of critical lift hoistingmore » and rigging procedures and restrictions on lift height are being considered during development of the new tank farm Basis for Interim Operation and Final Safety Analysis Report. The analysis contained herein provides information for selecting the appropriate lift height restrictions for these activities.« less

  17. A study of electro-mechanical and infrastructure instrumentation facilities in environmental laboratory.

    PubMed

    Dhawangale, R M; Kawale, S M; Waghmare, Maya; Pandya, G H; Kondawar, V K

    2006-01-01

    Environmental laboratories carry out measurement and analysis of a number of physical, chemical and biological parameters. Each parameter requires some sort of instrument for its determination. Providing efficient instrumentation services to various departments of the Institute is an stupendous task. Instrumentation services in the form of installation, operation, repair and maintenanace of electro-mechanical equipment requires an in-depth experience and knowledge of the working, fabrication, design and repair of similar type of instruments so that the need of space, installation pre-requisites, budget constraints, availability of essential spares parts could be assessed. The paper discusses the operation of an environmental instrument repairs and maintenance, and audio-visual facilities. Suggestions for drafting of the proper specifications for procurement of laboratory equipments, such as ovens, furnaces, refrigerators, blowers, audio visual aids, and spares and accessories are given in this paper. The paper also gives the detailed information on various aspects that are needed for checking and testing of the equipment against specification before putting it in operational use. Development of a preventive maintenance program involving QC checks and keeping an inventory of essential spares required are also discussed in this paper. It is felt that such services are essential in providing smooth support to carry out research and development activities of the Institute.

  18. An electronic flight bag for NextGen avionics

    NASA Astrophysics Data System (ADS)

    Zelazo, D. Eyton

    2012-06-01

    The introduction of the Next Generation Air Transportation System (NextGen) initiative by the Federal Aviation Administration (FAA) will impose new requirements for cockpit avionics. A similar program is also taking place in Europe by the European Organisation for the Safety of Air Navigation (Eurocontrol) called the Single European Sky Air Traffic Management Research (SESAR) initiative. NextGen will require aircraft to utilize Automatic Dependent Surveillance-Broadcast (ADS-B) in/out technology, requiring substantial changes to existing cockpit display systems. There are two ways that aircraft operators can upgrade their aircraft in order to utilize ADS-B technology. The first is to replace existing primary flight displays with new displays that are ADS-B compatible. The second, less costly approach is to install an advanced Class 3 Electronic Flight Bag (EFB) system. The installation of Class 3 EFBs in the cockpit will allow aircraft operators to utilize ADS-B technology in a lesser amount of time with a decreased cost of implementation and will provide additional benefits to the operator. This paper describes a Class 3 EFB, the NexisTM Flight-Intelligence System, which has been designed to allow users a direct interface with NextGen avionics sensors while additionally providing the pilot with all the necessary information to meet NextGen requirements.

  19. 33 CFR 150.515 - What are the requirements for weight testing of newly installed or relocated craft?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... weight testing of newly installed or relocated craft? 150.515 Section 150.515 Navigation and Navigable... testing of newly installed or relocated craft? (a) The operator must perform installation weight testing... (a) of this section, when survival crafts are relocated to another deepwater port. ...

  20. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  1. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  2. 30 CFR 250.807 - Additional requirements for subsurface safety valves and related equipment installed in high...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...

  3. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  4. Justification of indirect methods of bending stresses polyethylene pipes evaluation

    NASA Astrophysics Data System (ADS)

    Serebrennikov, A. A.; Serebrennikov, D. A.; Hakimov, Z. R.

    2017-10-01

    The world and Russian companies have a long experience of the polyethylene pipeline installation and operation. At the same time, the significant attention is paid to the improvement of the relevant machines and the production technology. The polyethylene pipeline installation experience proves that its operation properties (reliability and durability) depend on physical and mechanical characteristics of polyethylene, which should be saved during its installation. Defects can occur, including in cases when the pipe is subjected to the significant bending stresses during installation. To evaluate these stresses, including when exposed to cold weather conditions, an indirect method based on the relationship between strength characteristics and occurred deformations is proposed.

  5. Preliminary assessment report for Bee Caves Armory (former Nike BG-80 Fire Control Facility), Installation 48055, Austin, Texas. Installation Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dennis, C.

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.« less

  6. Maintaining High Quality Network Performance at the GSN: Sensor Installation Methods, New VBB Borehole Sensors and Data Quality Assessment from MUSTANG

    NASA Astrophysics Data System (ADS)

    Hafner, Katrin

    2017-04-01

    The goal of the Global Seismographic Network (GSN) is to provide the highest possible data quality and dynamic recording range in support of scientific needs. Considerable effort is made at each GSN seismic station site to achieve the lowest noise performance possible under local conditions. We continue to strive for higher data quality with a combination of new sensors and improved installation techniques. Most seismometers are installed either in 100 m deep steel-cased boreholes or in vaults tunneled underground. A few vaults are built at the surface or on the foundation of a building. All vault installations have a concrete pier, mechanically isolated from the floor, upon which the seismometers are placed. Many sites are now nearly 30 years old, and the GSN is investing in civil works at several stations to keep them in good condition or make critical repairs. Using GSN data from inception to the present, we will present analyses that demonstrate how successful these sensor installation strategies have been and describe ongoing experiments at GSN testing facilities to evaluate the best, most cost effective strategy to modernize existing GSN facilities. To improve sensor performance at some vault sites, we will employ new sensor installation strategies. Years of experience operating the GSN and the USArray Transportable Array, along with focused testing of emplacement strategies, show that the vulnerability of a sensor's horizontal components to tilt can be mitigated if the sensor package is buried at even shallow depth. At selected vault installations, shallow boreholes will be drilled to accommodate recently developed borehole VBB sensor models. The incremental cost of modern VBB instruments over standard BB models is small, and we expect to be able to preserve the GSN's crucial very broad bandwidth while improving noise performance and reliability using this strategy. A crucial link in making GSN station data available to the scientific community is the IRIS Data Management Center, which not only maintains the data archive, but also provides easy, rapid, and open access to data recorded from seconds to decades ago. All data flow to the IRIS DMC through the UCSD or ASL Data Collection Centers (DCCs). The DCCs focus on delivering data to the DMC, maintaining correct metadata for GSN stations, reviewing data quality from the stations that ASL and UCSD operate, and addressing circumstances that require special data handling, such as back filling following telemetry outages. Key to the high quality of the GSN data is the direct feedback on data quality problems identified by the DCC analysts to the network operations staff and field engineers. Aging of GSN equipment and station infrastructure has resulted in renewed emphasis on using data quality control tools such as MUSTANG. These tools allow the network operators to routinely monitor and analyze waveform data to detect and track problems and develop short and longer term action plans for improving network data quality. We will present summary data quality metrics for the GSN as obtained via these quality assurance tools.

  7. Update on Geothermal Direct-Use Installations in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckers, Koenraad J; Young, Katherine R; Snyder, Diana M.

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others;more » power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.« less

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, David E.

    The JEMA modulator was originally developed for the European Spallation Source (ESS) when Spain was under consideration as a location for the ESS facility. Discussions ensued and the Spallation Neutron Source Research Accelerator Division agreed to form a collaboration with ESS-Bilbao (ESS-B) consortium to provide services for specifying the requirements for a version of the modulator capable of operating twelve 550 kW klystrons, monitoring the technical progress on the contract with JEMA, installing and commissioning the modulator at SNS, and performing a 30 day full power test. This work was recently completed, and this report discusses those activities with primarymore » emphasis on the installation and testing activities.« less

  9. Satellite relay telemetry of seismic data in earthquake prediction and control

    USGS Publications Warehouse

    Jackson, Wayne H.; Eaton, Jerry P.

    1971-01-01

    The Satellite Telemetry Earthquake Monitoring Program was started in FY 1968 to evaluate the applicability of satellite relay telemetry in the collection of seismic data from a large number of dense seismograph clusters laid out along the major fault systems of western North America. Prototype clusters utilizing phone-line telemetry were then being installed by the National Center for Earthquake Research (NCER) in 3 regions along the San Andreas fault in central California; and the experience of installing and operating the clusters and in reducing and analyzing the seismic data from them was to provide the raw materials for evaluation in the satellite relay telemetry project.

  10. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    A heavy-load transport truck carries the Orion crew access arm along the NASA Causeway east toward State Road 3 at NASA's Kennedy Space Center in Florida. The access arm will be moved to the mobile launcher (ML) near the Vehicle Assembly Building at the center. The crew access arm will be installed at about the 274-foot level on the mobile launcher tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  11. ML Crew Access Arm Move

    NASA Image and Video Library

    2017-11-10

    A heavy-load transport truck carries the Orion crew access arm along the NASA Causeway east toward State Road 3 at NASA's Kennedy Space Center in Florida. The access arm will be moved to the mobile launcher (ML) near the Vehicle Assembly Building at the center. The crew access arm will be installed at about the 274-foot level on the tower. It will rotate from its retracted position and interface with the Orion crew hatch location to provide entry to the Orion crew module. The Ground Systems Development and Operations Program is overseeing installation of umbilicals and launch accessories on the ML tower to prepare for Exploration Mission-1.

  12. Operation and maintenance, fire rescue air-pack. Volume 2: Communications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.

  13. 78 FR 58570 - Environmental Assessment; Entergy Nuclear Operations, Inc., Big Rock Point

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... Assessment; Entergy Nuclear Operations, Inc., Big Rock Point AGENCY: Nuclear Regulatory Commission. ACTION... applicant or the licensee), for the Big Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI... Rock Point (BRP) Independent Spent Fuel Storage Installation (ISFSI). II. Environmental Assessment (EA...

  14. 30 CFR 56.12040 - Installation of operating controls.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of operating controls. 56.12040 Section 56.12040 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  15. 30 CFR 56.12040 - Installation of operating controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of operating controls. 56.12040 Section 56.12040 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  16. 30 CFR 56.12040 - Installation of operating controls.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of operating controls. 56.12040 Section 56.12040 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  17. 30 CFR 56.12040 - Installation of operating controls.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of operating controls. 56.12040 Section 56.12040 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  18. 30 CFR 56.12040 - Installation of operating controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of operating controls. 56.12040 Section 56.12040 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  19. 32 CFR 631.15 - Air Force policy.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Air Force policy. 631.15 Section 631.15 National... INVESTIGATIONS ARMED FORCES DISCIPLINARY CONTROL BOARDS AND OFF-INSTALLATION LIAISON AND OPERATIONS Off-Installation Operations (Military Patrols and Investigative Activities) and Policy § 631.15 Air Force policy...

  20. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air... baghouse applied to pushing emissions, you must install, operate, and maintain each bag leak detection...

  1. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...

  2. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational if... whole-vehicle cycle, all emission-related hardware and software must be installed and operational during.... Manufacturers shall use good engineering judgment in making such determinations. (c) Special provisions for...

  3. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational if... whole-vehicle cycle, all emission-related hardware and software must be installed and operational during.... Manufacturers shall use good engineering judgment in making such determinations. (c) Special provisions for...

  4. 40 CFR 86.1830-01 - Acceptance of vehicles for emission testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... good engineering judgment. (3) Test vehicles must have air conditioning installed and operational if... whole-vehicle cycle, all emission-related hardware and software must be installed and operational during.... Manufacturers shall use good engineering judgment in making such determinations. (c) Special provisions for...

  5. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  6. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  7. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  8. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  9. 75 FR 8508 - Computerized Tribal IV-D Systems and Office Automation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ...This rule enables Tribes and Tribal organizations currently operating comprehensive Tribal Child Support Enforcement programs under Title IV-D of the Social Security Act (the Act) to apply for and receive direct Federal funding for the costs of automated data processing. This rule addresses the Secretary's commitment to provide instructions and guidance to Tribes and Tribal organizations on requirements for applying for, and upon approval, securing Federal Financial Participation (FFP) in the costs of installing, operating, maintaining, and enhancing automated data processing systems.

  10. Proceedings of the Integrated Logistics Support Symposium held at Fort Worth, Texas on 30 November-2 December 1983.

    DTIC Science & Technology

    1983-12-02

    load of the vehicles. The vehicles will be recycled several times to the shore to provide round-the-clock, sustained operations. Phase III...delivery and storage systems will be installed and operated. The containers and breakbulk cargo will be recycled to the respective ships to permit a total...encouraged to submit to the manager everything, inclut ing trivia , with the winnowing of what is reported upward left to the manager’s discretion

  11. Reconfigurable Software for Mission Operations

    NASA Technical Reports Server (NTRS)

    Trimble, Jay

    2014-01-01

    We developed software that provides flexibility to mission organizations through modularity and composability. Modularity enables removal and addition of functionality through the installation of plug-ins. Composability enables users to assemble software from pre-built reusable objects, thus reducing or eliminating the walls associated with traditional application architectures and enabling unique combinations of functionality. We have used composable objects to reduce display build time, create workflows, and build scenarios to test concepts for lunar roving operations. The software is open source, and may be downloaded from https:github.comnasamct.

  12. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    NASA Technical Reports Server (NTRS)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  13. Implementation experiences of NASTRAN on CDC CYBER 74 SCOPE 3.4 operating system

    NASA Technical Reports Server (NTRS)

    Go, J. C.; Hill, R. G.

    1973-01-01

    The implementation of the NASTRAN system on the CDC CYBER 74 SCOPE 3.4 Operating System is described. The flexibility of the NASTRAN system made it possible to accomplish the change with no major problems. Various sizes of benchmark and test problems, ranging from two hours to less than one minute CP time were run on the CDC CYBER SCOPE 3.3, Univac EXEC-8, and CDC CYBER SCOPE 3.4. The NASTRAN installation deck is provided.

  14. A cold ejector for closed-cycle helium refrigerators

    NASA Technical Reports Server (NTRS)

    Johnson, D. L.; Daggett, D. L.

    1987-01-01

    The test results are presented of an initial cold helium ejector design that can be installed on a closed cycle refrigerator to provide refrigeration at temperatures below 4.2 K. The ejector, test apparatus, instrumentation, and test results are described. Tests were conducted both at room temperature and at cryogenic temperatures to provide operational experience with the ejector as well as for future use in the subsequent design of an ejector that will provide refrigeration at temperatures below 3 K.

  15. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the...

  16. [The hygienic characteristics of the medical technology accompaniment to the development, creation and operation of installations equipped with video display terminals].

    PubMed

    Prygun, A V; Lazarev, N V

    1998-10-01

    Radiation measuring on the work places of operators in command and control installations proved that environment parameters depending on electronic display functioning are in line with the regulations' requirements. Nevertheless the operator health estimates show that the problem of personnel security still exists. The authors recommend some measures to improve the situation.

  17. Final Environmental Assessment: Installation of Digital Airport Surveillance Radar at Grand Forks Air Force Base, North Dakota

    DTIC Science & Technology

    2011-05-11

    the installation of DOD Advanced Automation Systems (DAAS) and Voice Communications Switching Systems (VCSS) at DOD bases, was previously evaluated...utilities installed immediately next to the site. Operation of the DASR system is anticipated to have minimal long-term impacts to the natural and human ... humans at ground level and is not anticipated to pose ha1m to the general population. During operation of the DASR system, fuel will be stored in

  18. Minuteman III Cost Per Alert Hour Analysis

    DTIC Science & Technology

    2012-03-22

    Proverbs 16:3 I am eternally grateful for such a lovely wife and vibrant children; without your patience and support, I would...section. 12 Table 1: Alternative CPFH Factors H ild eb ra nt (1 99 0) W al la ce (2 00 0) Ki le y (2 00 1) Py le s (2 00 3) La ub ac he r (2 00 4...Installation Law Enforcement ( LE ) Operations. Installation LE Operations includes enforcing federal, state and military law, enforcing installation

  19. Near real time water resources data for river basin management

    NASA Technical Reports Server (NTRS)

    Paulson, R. W. (Principal Investigator)

    1973-01-01

    The author has identified the following significant results. Twenty Data Collection Platforms (DCP) are being field installed on USGS water resources stations in the Delaware River Basin. DCP's have been successfully installed and are operating well on five stream gaging stations, three observation wells, and one water quality monitor in the basin. DCP's have been installed at nine additional water quality monitors, and work is progressing on interfacing the platforms to the monitors. ERTS-related water resources data from the platforms are being provided in near real time, by the Goddard Space Flight Center to the Pennsylvania district, Water Resources Division, U.S. Geological Survey. On a daily basis, the data are computer processed by the Survey and provided to the Delaware River Basin Commission. Each daily summary contains data that were relayed during 4 or 5 of the 15 orbits made by ERTS-1 during the previous day. Water resources parameters relays by the platforms include dissolved oxygen concentrations, temperature, pH, specific conductance, well level, and stream gage height, which is used to compute stream flow for the daily summary.

  20. Electromagnetic propulsion test facility

    NASA Technical Reports Server (NTRS)

    Gooder, S. T.

    1984-01-01

    A test facility for the exploration of electromagnetic propulsion concept is described. The facility is designed to accommodate electromagnetic rail accelerators of various lengths (1 to 10 meters) and to provide accelerating energies of up to 240 kiloJoules. This accelerating energy is supplied as a current pulse of hundreds of kiloAmps lasting as long as 1 millisecond. The design, installation, and operating characteristics of the pulsed energy system are discussed. The test chamber and its operation at pressures down to 1300 Pascals (10 mm of mercury) are described. Some aspects of safety (interlocking, personnel protection, and operating procedures) are included.

Top