24 CFR 3286.411 - Certifying installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hart, William Eugene
These slides describe different strategies for installing Python software. Although I am a big fan of Python software development, robust strategies for software installation remains a challenge. This talk describes several different installation scenarios. The Good: the user has administrative privileges - Installing on Windows with an installer executable, Installing with Linux application utility, Installing a Python package from the PyPI repository, and Installing a Python package from source. The Bad: the user does not have administrative privileges - Using a virtual environment to isolate package installations, and Using an installer executable on Windows with a virtual environment. The Ugly:more » the user needs to install an extension package from source - Installing a Python extension package from source, and PyCoinInstall - Managing builds for Python extension packages. The last item referring to PyCoinInstall describes a utility being developed for the COIN-OR software, which is used within the operations research community. COIN-OR includes a variety of Python and C++ software packages, and this script uses a simple plug-in system to support the management of package builds and installation.« less
24 CFR 3286.111 - Installer certification of installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...
Automated installation methods for photovoltaic arrays
NASA Astrophysics Data System (ADS)
Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.
1982-11-01
Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3285.2 - Manufacturer installation instructions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.2 Manufacturer... approved installation instructions must include all topics covered in the Model Installation Standards for... installation instructions meet or exceed the Model Installation Standards for foundation support and anchoring...
24 CFR 3286.107 - Installation in accordance with standards.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... requirements. (1) For purposes of determining installer compliance, a manufactured home that is subject to the requirements of this subpart B must be installed in accordance with: (i) An installation design and...
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements of this part; and (6) A copy of foundation designs used to install the home, if different from the... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD... the installation work and the address of the home installed; (2) A copy of the contract pursuant to...
24 CFR 3286.405 - Installation suitability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in... installing a manufactured home at any site, the installer must assure that the site is suitable for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom
2011-12-01
Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systemsmore » are properly specified and installed with respect to the continuing structural integrity of the building.« less
A General Purpose High Performance Linux Installation Infrastructure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wachsmann, Alf
2002-06-17
With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then usesmore » kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.« less
ERIC Educational Resources Information Center
Moore, Charles G.; And Others
This curriculum guide provides materials for a nine-duty course in carpentry. The nine duties are estimating materials, preparing building site, sharpening tools, building and installing foundation forms, installing rough framing, installing roof components, installing exterior finishes, installing interior finishes, and assembling and…
45 CFR 2532.10 - Military Installation Conversion Demonstration programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to..., used with respect to an affected military installation, includes— (i) Conversion of the installation or...
45 CFR 2532.10 - Military Installation Conversion Demonstration programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to..., used with respect to an affected military installation, includes— (i) Conversion of the installation or...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
46 CFR 183.354 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...
Proper Installation of New Windows | Efficient Windows Collaborative
airtight fit and avoid water leakage. Always follow manufacturers installation guidelines and use trained professionals for window installation. Proper installation will: Protect from water damage. Windows should form a continuous water barrier where they meet the wall. With improper installation, water may penetrate
47 CFR 1.30003 - Installations on an AM antenna.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 1 2014-10-01 2014-10-01 false Installations on an AM antenna. 1.30003 Section... Random Selection Disturbance of AM Broadcast Station Antenna Patterns § 1.30003 Installations on an AM antenna. (a) Installations on a nondirectional AM tower. When antennas are installed on a nondirectional...
46 CFR 111.15-5 - Battery installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 111.15-5 - Battery installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 129.356 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...
46 CFR 111.15-5 - Battery installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...
46 CFR 111.15-5 - Battery installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...
46 CFR 111.15-5 - Battery installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-05-18
We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-05-19
We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.
76 FR 5505 - Airworthiness Directives; The Boeing Company Model 777-200 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... management units (ZMU) OPS, and the cabin system management unit (CSMU) OPS; installing OPS for the CSCP... require installing a new CSCP; installing a new cabin management system (CMS) CDB; and installing new OPS...), the zone management unit (ZMU) OPS, and the cabin system management unit (CSMU) OPS. Installing CSCP...
Proper Installation of Replacement Windows | Efficient Windows
. Quality installation is critical for an airtight fit and a continuous water barrier to prevent drafts , water damage and condensation. The complexity of the installation depends on whether you are considering and specifications. Install level, plumb, and square. Install water tight: water must be prevented
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
30 CFR 77.212 - Draw-off tunnel ventilation fans; installation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Draw-off tunnel ventilation fans; installation... UNDERGROUND COAL MINES Surface Installations § 77.212 Draw-off tunnel ventilation fans; installation. When fans are used to ventilate draw-off tunnels the fans shall be: (a) Installed on the surface; (b...
46 CFR 111.60-5 - Cable installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
78 FR 4092 - Airworthiness Directives; Cessna Aircraft Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... aircraft's hydraulic power pack wiring for incorrect installation, and if needed, correct the installation... hydraulic power pack wiring for incorrect installation, and if needed, correct the installation. Since...
Engineering report for simulated riser installation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brevick, C.H., Westinghouse Hanford
1996-05-09
The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
24 CFR 3285.102 - Installation of manufactured homes in flood hazard areas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Pre-Installation Considerations § 3285.102 Installation of manufactured homes in flood hazard...
Goto, Takaharu; Nagao, Kan; Ishida, Yuichi; Tomotake, Yoritoki; Ichikawa, Tetsuo
2015-02-01
This in vitro study investigated the effect of attachment installation conditions on the load transfer and denture movements of implant overdentures, and aims to clarify the differences among the three types of attachments, namely ball, Locator, and magnet attachments. Three types of attachments, namely ball, Locator, and magnetic attachments were used. An acrylic resin mandibular edentulous model with two implants placed in the bilateral canine regions and removable overdenture were prepared. The two implants and bilateral molar ridges were connected to three-axis load-cell transducers, and a universal testing machine was used to apply a 50 N vertical force to each site of the occlusal table in the first molar region. The denture movement was measured using a G(2) motion sensor. Three installation conditions, namely, the application of 0, 50, and 100 N loads were used to install each attachment on the denture base. The load transfer and denture movement were then evaluated. The resultant force decreased with increasing installation load for all attachments. In particular, the resultant force on implants on the loading side of the Locator attachment significantly decreased when the installation load was increased from 0 to 50 N, and that for magnetic attachment significantly decreased when the installation load was increased from 50 to 100 N. For the residual ridges on the loading side, the direction of the forces for all attachments changed to downward with increasing installation load. Furthermore, the yaw Euler angle increased with increasing installation load for the magnetic attachment. Subject to the limitations of this study, the use of any installation load greater than 0 N is recommended for the installation of ball and Locator attachments on a denture base. Regarding magnetic attachments, our results also recommend installation on a denture base using any installation load greater than 0 N, and suggest that the resultant force acting on the implant can be decreased by increasing the installation load; however, a large installation load of 100 N should be avoided when installing the attachment on the denture base to avoid increasing the denture movement. © 2014 by the American College of Prosthodontists.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... installed because they do not require a separate harmonics filter and thus can be installed in smaller... harmonics filter and thus can be installed in smaller spaces. At the Redwood Booster Station, which the... installed inside of the building rather than installing a separate harmonics [[Page 66376
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
.... Section X(a): Installation fees for new cabinets with power. 2. Section X(b): Installation fees for... period than the install timeframes. 3. Section X(c): Installation fees for cabinet power related to an order for a new cabinet. 4. Section X(d): Installation fees for cooling fans, perforated floor tiles and...
A cost analysis of a smoke alarm installation and fire safety education program.
Parmer, John E; Corso, Phaedra S; Ballesteros, Michael F
2006-01-01
While smoke alarm installation programs can help prevent residential fire injuries, the costs of running these programs are not well understood. We conducted a retrospective cost analysis of a smoke alarm installation program in 12 funded communities across four states. Costs included financial and economic resources needed for training, canvassing, installing, and following-up, within four cost categories: (a) personnel, (b) transportation, (c) facility, and (d) supplies. Local cost per completed home visit averaged 214.54 dollars, with an average local cost per alarm installed of 115.02 dollars. Combined state and local cost per alarm installed across all four states averaged 132.15 dollars. For every 1% increase in alarm installation, costs per alarm decrease by 1.32 dollars. As more smoke alarms are installed, the average installation cost per alarm decreases. By demonstrating effective economies of scale, this study suggests that smoke alarm programs can be implemented efficiently and receive positive economic returns on investment.
25th anniversary article: Rise to power--OPV-based solar parks.
Krebs, Frederik C; Espinosa, Nieves; Hösel, Markus; Søndergaard, Roar R; Jørgensen, Mikkel
2014-01-08
A solar park based on polymer solar cells is described and analyzed with respect to performance, practicality, installation speed, and energy payback time. It is found that a high voltage installation where solar cells are all printed in series enables an installation rate in Watts installed per minute that far exceed any other PV technology in existence. The energy payback time for the practical installation of polymer solar cell foil on a wooden 250 square meter platform in its present form is 277 days when operated in Denmark and 180 days when operated in southern Spain. The installation and de-installation rate is above 100 m min⁻¹, which, with the present performance and web width, implies installation of >200 W min⁻¹. In comparison, this also exceeds the overall manufacturing speed of the polymer solar cell foil with a width of 305 mm which is currently 1 m min⁻¹ for complete encapsulated and tested foil. It is also significant that simultaneous installation and de-installation which enables efficient schemes for decommissioning and recycling is possible. It is highlighted where research efforts should most rationally be invested in order to make grid electricity from OPV a reality (and it is within reach).
The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
OShaughnessy, Eric J.
This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.
Investigation on installation of offshore wind turbines
NASA Astrophysics Data System (ADS)
Wang, Wei; Bai, Yong
2010-06-01
Wind power has made rapid progress and should gain significance as an energy resource, given growing interest in renewable energy and clean energy. Offshore wind energy resources have attracted significant attention, as, compared with land-based wind energy resources, offshore wind energy resources are more promising candidates for development. Sea winds are generally stronger and more reliable and with improvements in technology, the sea has become a hot spot for new designs and installation methods for wind turbines. In the present paper, based on experience building offshore wind farms, recommended foundation styles have been examined. Furthermore, wave effects have been investigated. The split installation and overall installation have been illustrated. Methods appropriate when installing a small number of turbines as well as those useful when installing large numbers of turbines were analyzed. This investigation of installation methods for wind turbines should provide practical technical guidance for their installation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-04-01
The vast majority of U.S. residential solar PV installers are small local-scale companies, however the industry is relatively concentrated in a few large national-scale installers. We develop a novel approach using solar PV quote data to study the price behavior of large solar PV installers in the United States. Through a paired differences approach, we find that large installer quotes are about higher, on average, than non-large installer quotes made to the same customer. The difference is statistically significant and robust after controlling for factors such as system size, equipment quality, and time effects. The results suggest that low pricesmore » are not the primary value proposition of large installer systems. We explore several hypotheses for this finding, including that large installers are able to exercise some market power and/or earn returns from reputations.« less
Department of Defense Data Model, Version 1, Fy 1998, Volume 1.
1998-05-31
INSTALLATION-POSTAL-ADDRESS INSTALLATION-RESTORATION- ADVISORY -BOARD INSTALLATION-SURVEY INSTALLATION-USPS-POSTAL-ADDRESS INSTALLMENT- PAYMENT ...Standards 5 U SECTION 5 Entity Report 6 SECTION 6 Attribute Report 7 SECTION 7 Entity Relationship Report 8 SECTION 8 DoD Data Model Enhancements Report ...8 SECTION 9 Functional Area Using Model Report 8 Appendix A IDEFlx Modeling Conventions 8 Appendix B Acronyms ; 8 Appendix
The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
OShaughnessy, Eric J
Market structure refers to the number of firms and the distribution of market shares among firms within an industry. In The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016, we examine market structure in the context of residential solar PV. We find that over 8,000 companies have installed at least one residential PV system, with about 2,900 companies active in 2016. The majority of residential PV installers are relatively small companies, with about half of installers installing fewer than five systems. At the same time, a subset of high-volume installers accumulated market share, especially beginning aroundmore » 2010 with the emergence of alternative customer financing options.« less
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
24 CFR 3285.1 - Administration.
Code of Federal Regulations, 2011 CFR
2011-04-01
... DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.1 Administration. (a) Scope. These Model Installation Standards provide minimum requirements for the initial installation of new... performing a specific operation or assembly, will be deemed to comply with these Model Installation Standards...
Smart home in a box: usability study for a large scale self-installation of smart home technologies.
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen
2016-07-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.
Smart home in a box: usability study for a large scale self-installation of smart home technologies
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen
2017-01-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390
14 CFR 1203.408 - Assistance by installation security classification officers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... ADMINISTRATION INFORMATION SECURITY PROGRAM Guides for Original Classification § 1203.408 Assistance by installation security classification officers. Installation Security Classification Officers, as the... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Assistance by installation security...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
29 CFR 1910.306 - Specific purpose equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... and multicar installations. On single-car and multicar installations, equipment receiving electrical... ADMINISTRATION, DEPARTMENT OF LABOR OCCUPATIONAL SAFETY AND HEALTH STANDARDS Electrical Design Safety Standards for Electrical Systems § 1910.306 Specific purpose equipment and installations. (a) Electric signs and...
14 CFR 1203.408 - Assistance by installation security classification officers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... ADMINISTRATION INFORMATION SECURITY PROGRAM Guides for Original Classification § 1203.408 Assistance by installation security classification officers. Installation Security Classification Officers, as the... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Assistance by installation security...
Land Management Panel: Army’s Net Zero Installation Initiative
2012-05-24
same watershed so not to deplete the groundwater and surface water resources of that region in quantity or quality. A Net Zero WASTE Installation...0.15 0.2 0.25 Assistant Secretary of the Army (Installations, Energy & Environment) Net Zero Waste A Net Zero WASTE Installation reduces, reuses...Net Zero Waste Strategy 17 Assistant Secretary of the Army (Installations, Energy & Environment) Waste Roadmaps Material flow analysis
46 CFR 182.220 - Installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...
46 CFR 182.220 - Installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...
46 CFR 182.220 - Installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...
46 CFR 182.220 - Installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...
46 CFR 182.220 - Installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration and...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
46 CFR 129.395 - Radio installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with... radios, if installed, may be powered from a local lighting power source, such as the pilothouse lighting panel, provided each radio power source has a separate overcurrent protection device. ...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
24 CFR 3285.501 - Home installation manual supplements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features must...
2014-09-01
get install python2.7 python- openssl python-gevent libevent-dev python2.7-dev build-essential make liblapack-dev libmysqlclient-dev python-chardet...apt-get install python-dev openssl python- openssl python-pyasn1 python-twisted • apt-get install subversion • apt-get install authbind 4
24 CFR 3285.906 - Telephone and cable TV.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Information for Manufacturer's Installation Instructions § 3285.906 Telephone and cable TV. It is recommended that the installation instructions explain that telephone and cable TV wiring should be installed in accordance with requirements of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... or no such training) working on, near, or with the following installations: (1) Premises wiring. Installations of electric conductors and equipment within or on buildings or other structures, and on other... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations...
Preventive medicine oversight of splash pads on military installations.
Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley
2015-01-01
Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.
Strain gage installation and survivability on geosynthetics used in flexible pavements
NASA Astrophysics Data System (ADS)
Brooks, Jeremy A.
The use of foil type strain gages on geosynthetics is poorly documented. In addition, very few individuals are versed in proper installation techniques or calibration methods. Due to the limited number of knowledgeable technicians there is no information regarding the susceptibility of theses gages to errors in installation by inexperienced installers. Also lacking in the documentation related to the use of foil type strain gages on geosynthetics is the survivability of the gages in field conditions. This research documented procedures for installation, calibration, and survivability used by the project team to instruments a full scale field installation in Marked Tree, AR. This research also addressed sensitivity to installation errors on both geotextile and geogrid. To document the process of gage installation an experienced technician, Mr. Joe Ables, formerly of the UASCE Waterways Experiment Station, was consulted. His techniques were combined with those discovered in related literature and those developed by the research team to develop processes that were adaptable to multiple gage geometries and parent geosynthetics. These processes were described and documented in a step by step manner with accompanying photographs, which should allow virtually anyone with basic electronics knowledge to install these gages properly. Calibration of the various geosynthetic / strain gage combinations was completed using wide width tensile testing on multiple samples of each material. The tensile testing process was documented and analyzed using digital photography to analyze strain on the strain gage itself. Calibration factors for each geosynthtics used in the full scale field testing were developed. In addition, the process was thoroughly documented to allow future researchers to calibrate additional strain gage and geosynthetic combinations. The sensitivity of the strain gages to installation errors was analyzed using wide width tensile testing and digital photography to determine the variability of the data collected from gages with noticeable installation errors as compared to properly installed gages. Induced errors varied based on the parent geosynthetics material, but included excessive and minimal waterproofing, gage rotation, gage shift, excessive and minimal adhesive, and excessive and minimal adhesive impregnation loads. The results of this work indicated that minor errors in geotextile gage installation that are noticeable and preventable by the experienced installer have no statistical significance on the data recorded during the life span of geotextile gages; however the lifespan of the gage may be noticeably shortened by such errors. Geogrid gage installation errors were found to cause statistically significant changes in the data recorded from improper installations. The issue of gage survivability was analyzed using small scale test sections instrumented and loaded similarly to field conditions anticipated during traditional roadway construction. Five methods of protection were tested for both geotextile and geogrid including a sand blanket, inversion, semi-hemispherical PCV sections, neoprene mats, and geosynthetic wick drain. Based on this testing neoprene mats were selected to protect geotextile installed gages, and wick drains were selected to protect geogrid installed gages. These methods resulted in survivability rates of 73% and 100% in the full scale installation respectively. This research and documentation may be used to train technicians to install and calibrate geosynthetic mounted foil type strain gages. In addition, technicians should be able to install gages in the field with a high probability of gage survivability using the protection methods recommended.
Ma, Tracey; Byrne, Patrick A; Bhatti, Junaid A; Elzohairy, Yoassry
2016-10-01
Drinking and driving is a major risk factor for traffic injuries. Although ignition interlocks reduce drinking and driving while installed, several issues undermine their implementation including delayed eligibility for installation, low installation once eligible, and a return to previous risk levels after de-installation. The Canadian province of Ontario introduced a "Reduced Suspension with Ignition Interlock Conduct Review" Program, significantly changing pre-existing interlock policy. The Program incentivizes interlock installation and an "early" guilty plea. It also attempts to reduce long-term recidivism through behavioural feedback and compliance-based removal. This evaluation is the first in assessing Program impact. Ontario drivers with a first time alcohol-impaired driving conviction between July 1, 2005 and November 25, 2014 comprised the study cohort. Longitudinal analyses, using interrupted time series and Cox regression, were conducted in which exposure was the Program and the outcomes were ignition interlock installation (N=30,200), pre-trial elapsed time (N=30,200), and post-interlock recidivism (N=9326). After Program implementation, installation rates increased by 54% and pre-trial elapsed time decreased by 146 days. Results suggest no effect on post-interlock recidivism. Through an incentive-based design, this Program was effective at addressing two commonly cited barriers to interlock implementation- delayed eligibility for installation and low installation once eligible. Results reveal that installation rates are responsive not only to incentivization but also to other external factors, thus presenting an opportunity for policy makers to find unique ways to influence interlock uptake, and thereby, to extend their deterrent effects to a larger subset of the population. This study is one of the few that do not rely on proxy measures of installation rate. Copyright © 2016 Crown. Published by Elsevier Ltd.. All rights reserved.
Teaching infant car seat installation via interactive visual presence: An experimental trial.
Schwebel, David C; Johnston, Anna; Rouse, Jenni
2017-02-17
A large portion of child restraint systems (car seats) are installed incorrectly, especially when first-time parents install infant car seats. Expert instruction greatly improves the accuracy of car seat installation but is labor intensive and difficult to obtain for many parents. This study was designed to evaluate the efficacy of 3 ways of communicating instructions for proper car seat installation: phone conversation; HelpLightning, a mobile application (app) that offers virtual interactive presence permitting both verbal and interactive (telestration) visual communication; and the manufacturer's user manual. A sample of 39 young adults of child-bearing age who had no previous experience installing car seats were recruited and randomly assigned to install an infant car seat using guidance from one of those 3 communication sources. Both the phone and interactive app were more effective means to facilitate accurate car seat installation compared to the user manual. There was a trend for the app to offer superior communication compared to the phone, but that difference was not significant in most assessments. The phone and app groups also installed the car seat more efficiently and perceived the communication to be more effective and their installation to be more accurate than those in the user manual group. Interactive communication may help parents install car seats more accurately than using the manufacturer's manual alone. This was an initial study with a modestly sized sample; if results are replicated in future research, there may be reason to consider centralized "call centers" that provide verbal and/or interactive visual instruction from remote locations to parents installing car seats, paralleling the model of centralized Poison Control centers in the United States.
Code of Federal Regulations, 2013 CFR
2013-10-01
... astronomy, research and receiving installations. 73.1030 Section 73.1030 Telecommunication FEDERAL... Broadcast Stations § 73.1030 Notifications concerning interference to radio astronomy, research and receiving installations. (a)(1) Radio astronomy and radio research installations. In order to minimize...
Code of Federal Regulations, 2014 CFR
2014-10-01
... astronomy, research and receiving installations. 73.1030 Section 73.1030 Telecommunication FEDERAL... Broadcast Stations § 73.1030 Notifications concerning interference to radio astronomy, research and receiving installations. (a)(1) Radio astronomy and radio research installations. In order to minimize...
Code of Federal Regulations, 2010 CFR
2010-10-01
... astronomy, research and receiving installations. 73.1030 Section 73.1030 Telecommunication FEDERAL... Broadcast Stations § 73.1030 Notifications concerning interference to radio astronomy, research and receiving installations. (a)(1) Radio astronomy and radio research installations. In order to minimize...
Code of Federal Regulations, 2011 CFR
2011-10-01
... astronomy, research and receiving installations. 73.1030 Section 73.1030 Telecommunication FEDERAL... Broadcast Stations § 73.1030 Notifications concerning interference to radio astronomy, research and receiving installations. (a)(1) Radio astronomy and radio research installations. In order to minimize...
Code of Federal Regulations, 2012 CFR
2012-10-01
... astronomy, research and receiving installations. 73.1030 Section 73.1030 Telecommunication FEDERAL... Broadcast Stations § 73.1030 Notifications concerning interference to radio astronomy, research and receiving installations. (a)(1) Radio astronomy and radio research installations. In order to minimize...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...
48 CFR 1850.104-70 - Lead NASA installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...
48 CFR 1850.104-70 - Lead NASA installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...
48 CFR 1850.104-70 - Lead NASA installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...
Sprinkler System Installer. Occupational Analyses Series.
ERIC Educational Resources Information Center
Chinien, Chris; Boutin, France
This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…
14 CFR 27.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...
14 CFR 27.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...
Flat-plate solar collector - installation package
NASA Technical Reports Server (NTRS)
1978-01-01
Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.
Integrated Baseline System (IBS). Version 1.03, System Management Guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, J.R.; Bailey, S.; Bower, J.C.
This IBS System Management Guide explains how to install or upgrade the Integrated Baseline System (IBS) software package. The IBS is an emergency management planning and analysis tool that was developed under the direction of the Federal Emergency Management Agency (FEMA). This guide includes detailed instructions for installing the IBS software package on a Digital Equipment Corporation (DEC) VAX computer from the IBS distribution tapes. The installation instructions include procedures for both first-time installations and upgrades to existing IBS installations. To ensure that the system manager has the background necessary for successful installation of the IBS package, this guide alsomore » includes information on IBS computer requirements, software organization, and the generation of IBS distribution tapes. When special utility programs are used during IBS installation and setups, this guide refers you to the IBS Utilities Guide for specific instructions. This guide also refers you to the IBS Data Management Guide for detailed descriptions of some IBS data files and structures. Any special requirements for installation are not documented here but should be included in a set of installation notes that come with the distribution tapes.« less
NASA Technical Reports Server (NTRS)
Cook, M.
1989-01-01
The procedures, performance, and results obtained from the Thiokol Corporation/Wasatch Redesigned Field Joint Protection System (FJPS) Installation Evaluation are documented. The purpose of the evaluation was to demonstrate and develop the procedures required to install two different concepts (referred to as Concepts 1 and 3) of the redesigned FJPS. The processing capability of each configuration was then evaluated and compared. The FJPS is installed on redesigned solid rocket motors (RSRM) to protect the field joints from rain intrusion and to maintain the joint temperature sensor measurement between 85 and 122 F while the boosters are on the launch pad. The FJPS is being redesigned to reduce installation timelines at KSC and to simplify or eliminate installation processing problems related to the present design of an EPDM moisture seal/extruded cork combination. Several installation techniques were evaluated, and a preferred method of application was developed for each concept. The installations were performed with the test article in the vertical (flight) position. Comparative timelines between the two concepts were also developed. An additional evaluation of the Concept 3 configuration was performed with the test article in the horizontal position, to simulate an overhead installation on a technical evaluation motor (TEM).
30 CFR 75.807 - Installation of high-voltage transmission cables.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of high-voltage transmission...-Voltage Distribution § 75.807 Installation of high-voltage transmission cables. [Statutory Provisions] All underground high-voltage transmission cables shall be installed only in regularly inspected air courses and...
46 CFR 11.470 - Officer endorsements as offshore installation manager.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Officer endorsements as offshore installation manager... Officer endorsements as offshore installation manager. (a) Officer endorsements as offshore installation manager (OIM) include: (1) OIM Unrestricted; (2) OIM Surface Units on Location; (3) OIM Surface Units...
14 CFR 25.1703 - Function and installation: EWIS.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Electrical equipment and installations. 29... installations has shown that maintaining safe cell temperatures and pressures presents no problem. (3) No...
46 CFR 181.520 - Installation and location.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2012 CFR
2012-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2010 CFR
2010-07-01
... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2011 CFR
2011-07-01
... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...
Practical aspects of instrumentation system installation, volume 13
NASA Technical Reports Server (NTRS)
Borek, R. W.; Pool, A. (Editor); Sanderson, K. C. (Editor)
1981-01-01
A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
14 CFR 27.1301 - Function and installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 27.1301 Section... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment General § 27.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function; (b...
14 CFR 25.1301 - Function and installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 25.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1301 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function...
14 CFR 29.1301 - Function and installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 29.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function...
14 CFR 23.1301 - Function and installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 23.1301 Section... Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function. (b) Be labeled as to its identification, function, or operating limitations...
14 CFR 31.71 - Function and installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 31.71 Section 31... AIRWORTHINESS STANDARDS: MANNED FREE BALLOONS Equipment § 31.71 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function; (2) Be...
26 CFR 1.381(c)(8)-1 - Installment method.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 26 Internal Revenue 4 2014-04-01 2014-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381... (CONTINUED) INCOME TAXES (CONTINUED) Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a... the installment method, then the acquiring corporation shall be treated as the distributor or...
26 CFR 1.381(c)(8)-1 - Installment method.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 26 Internal Revenue 4 2012-04-01 2012-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381... (CONTINUED) INCOME TAXES (Continued) Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a... the installment method, then the acquiring corporation shall be treated as the distributor or...
26 CFR 1.381(c)(8)-1 - Installment method.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 26 Internal Revenue 4 2013-04-01 2013-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381... (CONTINUED) INCOME TAXES (CONTINUED) Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a... the installment method, then the acquiring corporation shall be treated as the distributor or...
24 CFR 3286.103 - DAPIA-approved installation instructions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... instructions for the home. (2) If the installation requires a design that is different from that provided by... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD... purchaser or lessee. (1) For each manufactured home sold or leased to a purchaser or lessee, the retailer...
6 CFR 11.9 - Collection in installments.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 6 Domestic Security 1 2011-01-01 2011-01-01 false Collection in installments. 11.9 Section 11.9 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLAIMS § 11.9 Collection in installments. DHS may accept payment of a DHS debt in regular installments, in accordance with the provisions...
6 CFR 11.9 - Collection in installments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 6 Domestic Security 1 2010-01-01 2010-01-01 false Collection in installments. 11.9 Section 11.9 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLAIMS § 11.9 Collection in installments. DHS may accept payment of a DHS debt in regular installments, in accordance with the provisions...
32 CFR 636.11 - Installation traffic codes
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes 636.11 Section 636.11 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In...
32 CFR 1903.13 - Intoxicated on an Agency installation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on an...
32 CFR 1903.13 - Intoxicated on an Agency installation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on an...
32 CFR 1903.13 - Intoxicated on an Agency installation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on an...
32 CFR 1903.13 - Intoxicated on an Agency installation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on an...
32 CFR 1903.13 - Intoxicated on an Agency installation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on an...
30 CFR 77.201 - Methane content in surface installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...
30 CFR 57.12050 - Installation of trolley wires.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...
30 CFR 57.12050 - Installation of trolley wires.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...
29 CFR 1926.1414 - Wire rope-selection and installation criteria.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 8 2011-07-01 2011-07-01 false Wire rope-selection and installation criteria. 1926.1414... Derricks in Construction § 1926.1414 Wire rope—selection and installation criteria. (a) Original equipment wire rope and replacement wire rope must be selected and installed in accordance with the requirements...
46 CFR 120.354 - Battery installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...
46 CFR 58.10-15 - Gas turbine installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...
46 CFR 58.10-15 - Gas turbine installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...
30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of water sprinkler systems...
30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of water sprinkler systems...
30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of water sprinkler systems...
30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of water sprinkler systems...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
47 CFR 80.1083 - Ship radio installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Ship radio installations. 80.1083 Section 80... for Ship Stations § 80.1083 Ship radio installations. (a) Ships must be provided with radio... controls for operating the radio installation; and (5) Be clearly marked with the call sign, the ship...
Improve Carpet Life with Proper Installation.
ERIC Educational Resources Information Center
Grogan, Ralph
1998-01-01
Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…
14 CFR 23.929 - Engine installation ice protection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...
14 CFR 23.929 - Engine installation ice protection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...
14 CFR 23.929 - Engine installation ice protection.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...
14 CFR 23.929 - Engine installation ice protection.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...
14 CFR 23.929 - Engine installation ice protection.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...
Aviation Environmental Design Tool (AEDT) : Version 2c service Pack 1 : installation guide.
DOT National Transportation Integrated Search
2016-12-01
This document provides detailed instructions on how to install and run AEDT 2c Service Pack 1 (SP1). It is important to follow the installation instructions in the order listed below, as Microsoft SQL Server 2008 R2 is a prerequisite for AEDT. Instal...
An Investigation of the Aerodynamics and Cooling of a Horizontally-Opposed Engine Installation
NASA Technical Reports Server (NTRS)
Miley, S. J.
1977-01-01
A research program to investigate the aerodynamics of reciprocating aircraft engine cooling installations is discussed. Current results from a flight test program are presented concerning installation flow measurement methods. The influence of different inlet designs on installation cooling effectiveness and efficiency are described.
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...) Changes or alterations in the electrical installations of vessels now in service shall be in accordance...
30 CFR 77.201 - Methane content in surface installations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...
32 CFR 700.325 - The Assistant Secretary of the Navy (Installations and Environment).
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Installations and Environment). 700.325 Section 700.325 National Defense Department of Defense (Continued... Assistants § 700.325 The Assistant Secretary of the Navy (Installations and Environment). The Assistant Secretary of the Navy (Installations and Environment) is responsible for: (a) Policy relating to Navy...
30 CFR 75.1101-7 - Installation of water sprinkler systems; requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of water sprinkler systems... Protection § 75.1101-7 Installation of water sprinkler systems; requirements. (a) The fire-control components of each water sprinkler system shall be installed, as far as practicable in accordance with the...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2013 CFR
2013-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...
40 CFR 60.2939 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2014 CFR
2014-07-01
... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...
46 CFR 120.354 - Battery installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...
46 CFR 120.354 - Battery installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...
46 CFR 120.354 - Battery installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...
46 CFR 120.354 - Battery installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilkerson, Andrea M.; Davis, Robert G.
The Yuma Sector Border Patrol Area is a high temperature and high solar radiation environment, providing an opportunity for the U.S. Department of Energy (DOE) to study thermal effects on outdoor light-emitting diode (LED) luminaires outside of the testing laboratory. Six LED luminaires were installed on three poles on the U.S.- Mexico border in February 2014 as part of a trial installation, which was detailed in a prior GATEWAY report.1 The initial trial installation was intended as a short - term test of six luminaires installed on three poles before proceeding with the complete installation of over 400 luminaires. Unexpectedmore » delays in the full installation have prevented the detailed evaluations initially planned, but the six installed LED luminaires continue to be monitored, and over the past year illuminance measurements were recorded initially in February 2014 and again in September 2014 at about 2500 hours of operation and in March 2015 at about 5000 hours of operation.« less
The influence of installation angle of GGIs on full-tensor gravity gradient measurement
NASA Astrophysics Data System (ADS)
Wei, Hongwei; Wu, Meiping
2018-03-01
Gravity gradient plays an important role in many disciplines as a fundamental signal to reflect the information of the earth. Full-tensor gravity gradient measurement (FGGM) is an effective way to obtain the gravity gradient signal. In this paper, the installation mode of GGIs in FGGM is studied. It is expected that the accuracy of FGGM will be improved by optimizing the installation mode of GGIs. In addition, we analysed the relationship between GGIs’ installation angle and FGGM by establishing the measurement model of FGGM. Then the following conclusions was proved that there was no relationship between GGIs’ installation angle and the measurement result. This conclusion showed that there was no optimal angle for the GGIs’ installation in FGGM, and the installation angle only need to satisfy the relationship shown in the conclusion section of this paper. Finally, this conclusion was demonstrated by computer simulations.
Case report: silicatosis in a carpet installer.
Szeinuk, Jaime; Wilk-Rivard, Elizabeth J
2007-06-01
Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung.
26 CFR 1.381(c)(8)-1 - Installment method.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 4 2010-04-01 2010-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381... (CONTINUED) INCOME TAXES Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a) Carryover... corporation has elected under section 453 and the regulations thereunder to report on the installment method...
26 CFR 1.381(c)(8)-1 - Installment method.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 26 Internal Revenue 4 2011-04-01 2011-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381... (CONTINUED) INCOME TAXES Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a) Carryover... corporation has elected under section 453 and the regulations thereunder to report on the installment method...
Installation-Wide Energy Conservation Demonstration at Fort McClellan, Alabama
1988-11-01
Inefficient Electrical Motors 12 Dispensary Chiller Installation 12 Combustion Optimization of Gas-fired Heating Equipment 12 Infiltration Study of Family... Chiller Installation 34 5 FAMILY HOUSING .................................................... 37 Combustion Optimization of Gas-fired Heating...in Outdoor Air Ventilation 59 Replacement of Inefficient Electric Motors 59 Dispensary Chiller Installation 60 Combustion Optimization of Gas-fired
33 CFR 150.515 - What are the requirements for weight testing of newly installed or relocated craft?
Code of Federal Regulations, 2010 CFR
2010-07-01
... weight testing of newly installed or relocated craft? 150.515 Section 150.515 Navigation and Navigable... testing of newly installed or relocated craft? (a) The operator must perform installation weight testing... (a) of this section, when survival crafts are relocated to another deepwater port. ...
Horizontal/Vertical Stock Fund Cost Comparison
1974-08-01
units. Installation Supply Division account and other instal- lation operated activities: Self -Service Supply Store, Clothing Initial...installation supply operations are the Self -Service Supply Center, Clothing Sales Store, Central Issue Facility, and Clothing Initial Issue Point. Stock- age...stocks, stocks for installation operated supply activities such as the Self Service Supply Store, Clothing Sales Store and
24 CFR 3286.203 - Installation license required.
Code of Federal Regulations, 2010 CFR
2010-04-01
... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...) The installer must display an original or a copy of a valid installation license at the site of the... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...
32 CFR 1903.6 - Admission on to an Agency installation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Admission on to an Agency installation. 1903.6 Section 1903.6 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.6 Admission on to an Agency installation. (a) Access on to any...
32 CFR 1903.6 - Admission on to an Agency installation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Admission on to an Agency installation. 1903.6 Section 1903.6 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.6 Admission on to an Agency installation. (a) Access on to any...
32 CFR 1903.6 - Admission on to an Agency installation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Admission on to an Agency installation. 1903.6 Section 1903.6 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.6 Admission on to an Agency installation. (a) Access on to any...
32 CFR 1903.6 - Admission on to an Agency installation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Admission on to an Agency installation. 1903.6 Section 1903.6 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.6 Admission on to an Agency installation. (a) Access on to any...
32 CFR 1903.6 - Admission on to an Agency installation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Admission on to an Agency installation. 1903.6 Section 1903.6 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.6 Admission on to an Agency installation. (a) Access on to any...
16 CFR 460.17 - What installers must tell their customers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...
16 CFR 460.17 - What installers must tell their customers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...
16 CFR 460.17 - What installers must tell their customers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...
16 CFR 460.17 - What installers must tell their customers.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...
16 CFR 460.17 - What installers must tell their customers.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all insulation except loose-fill and aluminum foil, the receipt must show the coverage area, thickness, and R...
Code of Federal Regulations, 2014 CFR
2014-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
Code of Federal Regulations, 2012 CFR
2012-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
Code of Federal Regulations, 2013 CFR
2013-07-01
... valves and related equipment installed in high pressure high temperature (HPHT) environments. 250.807... INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Production... installed in high pressure high temperature (HPHT) environments. (a) If you plan to install SSSVs and...
Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.
ERIC Educational Resources Information Center
Seaman, George B., Sr.
This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
40 CFR 1054.655 - What special provisions apply for installing and removing altitude kits?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false What special provisions apply for installing and removing altitude kits? 1054.655 Section 1054.655 Protection of Environment ENVIRONMENTAL... installing and removing altitude kits? An action for the purpose of installing or modifying altitude kits and...
30 CFR 585.702 - What must I include in my Fabrication and Installation Report?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...
30 CFR 585.702 - What must I include in my Fabrication and Installation Report?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...
30 CFR 585.702 - What must I include in my Fabrication and Installation Report?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Installation Report? 585.702 Section 585.702 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF... following items in your Fabrication and Installation Report: Required documents Required contents Other... electronic copy. (2) Schedule Fabrication and installation You must submit 1 paper copy and 1 electronic copy...
49 CFR 192.321 - Installation of plastic pipe.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...
49 CFR 192.193 - Valve installation in plastic pipe.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY... installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
46 CFR 76.33-20 - Operation and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.33-20 Section 76.33-20... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so... audible alarm in the engine room. For installations contracted for on or after January 1, 1962, where...
46 CFR 169.673 - Installation of wiring for power and lighting circuits.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...
Code of Federal Regulations, 2010 CFR
2010-10-01
... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...
49 CFR 192.193 - Valve installation in plastic pipe.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...
49 CFR 192.321 - Installation of plastic pipe.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...
49 CFR 192.193 - Valve installation in plastic pipe.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...
49 CFR 192.193 - Valve installation in plastic pipe.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...
49 CFR 192.321 - Installation of plastic pipe.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...
49 CFR 192.321 - Installation of plastic pipe.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...
49 CFR 192.193 - Valve installation in plastic pipe.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...
49 CFR 192.321 - Installation of plastic pipe.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...
78 FR 72016 - User Fees for Processing Installment Agreements and Offers in Compromise
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... regulations affect taxpayers who wish to pay their federal tax liabilities through installment agreements and... to pay $43 for any new installment agreement, including a direct debit installment agreement. The... do not have the means to pay the user fee, even at the reduced rate. The commenter stated that low...
An Evaluation of Installation Methods for STS-1 Seismometers
Holcomb, L. Gary; Hutt, Charles R.
1992-01-01
INTRODUCTION This report documents the results of a series of experiments conducted by the authors at the Albuquerque Seismological Laboratory (ASl) during the spring and summer of 1991; the object of these experiments was to obtain and document quantitative performance comparisons of three methods of installing STS-1 seismometers. Historically, ASL has installed STS-1 sensors by cementing their thick glass base plates to the concrete floor of the vault (see Peterson and Tilgner, 1985, p 44 and Figure 31, p 51 for the details of this installation technique). This installation technique proved to be fairly satisfactory for the China Digital Seismic Network and for several sets of STS-1 sensors installed in other locations since that time. However, the cementing operation is rather labor intensive and the concrete requires a lengthy (about 1 week) curing time during which the sensor installed on it is noisy. In addition it is difficult to assure that all air bubbles have been removed from the interface between the cement and the glass base plate. If air bubbles are present beneath the plate, horizontal sensors can be unacceptably noisy. Moving a sensor installed in this manner requires the purchase of a new glass base plate because the old plate normally can not be removed without breakage. Therefore, this study was undertaken with the aim of developing an improved method of installing STS-1's. The goals were to develop a method which requires less field site labor during the installation and assures a higher quality installation when finished. In addition, the improved installation technique should promote portability. Two alternate installation techniques were evaluated in this study. One method replaces the cement between the base plate and the vault floor with sand. This method has been used in the French Geoscope program and in several IRIS/IDA installations made by the University of California at San Diego (UCSD) and possibly others. It is easily implemented in the field and is quite cheap. The other method utilizes a so called warpless housing designed by E. Wielandt and implemented at ASL. This housing is quite similar to the case design of the STS-2 sensor system. It is designed to minimize the effects of atmospheric pressure variations on the sealed housing.
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
46 CFR 111.35-1 - Electrical propulsion installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13, 4-8-5/5.17...
Installation Guidelines for Solar DHW Systems in One- and Two-Family Dwellings. Second Edition.
ERIC Educational Resources Information Center
Hollander, Peter; And Others
Described are some of the better techniques for installing solar domestic hot water (DHW) systems. By using these guidelines, along with the manufacturer's manual, professional installation contractors and skilled homeowners should be able to install and fill a solar DHW system. Among the topics considered are system layouts, siting, mounting…
Code of Federal Regulations, 2011 CFR
2011-07-01
... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...
Code of Federal Regulations, 2010 CFR
2010-07-01
... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...
Criteria for Evaluating United States Marine Corps Installation Strategic Management
2001-12-01
STATES MARINE CORPS INSTALLATION STRATEGIC MANAGEMENT by James E. Leighty December 2001 Thesis Advisor: Joseph San Miguel Report...Marine Corps Installation Strategic Management Contract Number Grant Number Program Element Number Author(s) Leighty, James Project Number Task...TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE: Criteria For Evaluating United States Marine Corps Installation Strategic
75 FR 27662 - Special Conditions: Boeing 747-468, Installation of a Medical Lift
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
...; Notice No. 25-99-11-SC] Special Conditions: Boeing 747-468, Installation of a Medical Lift AGENCY... Aviation, will have a novel or unusual design feature associated with the installation of a medical lift... modification includes the installation of a medical lift between the main deck and upper deck. The lift allows...
An earth anchor system: installation and design guide.
R.L. Copstead; D.D. Studier
1990-01-01
A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...
Conceptual Design for the New RPI 2020 Linac
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adolphsen, C.; Bane, K.; Dolgashev, V.
2014-10-29
The Rensselaer Polytechnic Institute (RPI) spectrometer is an installation based on an L-band linear accelerator designed and installed many decades ago. While this installation has served many important experiments over the decades, a new more powerful and more flexible linac to serve a wider range of experiments is envisioned as an upgrade to the existing installation by 2020.
24 CFR 3280.708 - Exhaust duct system and provisions for the future installation of a clothes dryer.
Code of Federal Regulations, 2010 CFR
2010-04-01
...(a)(1) through (5). (c) Provisions for future installation of electric clothes dryers. When wiring is... for the future installation of a clothes dryer. 3280.708 Section 3280.708 Housing and Urban... duct system and provisions for the future installation of a clothes dryer. (a) Clothes dryers. (1) All...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lange, K.
1974-12-06
An installation is described for the catalytic afterburning of exhaust gases in an internal combustion engine. The system includes a line by-passing the installation for the catalytic afterburning, in which is arranged a throttle valve actuated in dependence on the temperature of the installation. The throttle valve also can be actuated independently of the temperature of the installation, but in dependence of the oil pressure which continues to exist for a short period of time after turning off the engine.
Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naim
2016-09-01
Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study themore » relationship between market dynamics and pricing with more precision.« less
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
46 CFR 183.392 - Radiotelephone installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided...
28 CFR 36.304 - Removal of barriers.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., providing Brailled and raised character signage, widening doors, providing visual alarms, and installing... doors, installation of ramps, providing accessible signage, widening of toilet stalls, and installation...
28 CFR 36.304 - Removal of barriers.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., providing Brailled and raised character signage, widening doors, providing visual alarms, and installing... doors, installation of ramps, providing accessible signage, widening of toilet stalls, and installation...
28 CFR 36.304 - Removal of barriers.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., providing Brailled and raised character signage, widening doors, providing visual alarms, and installing... doors, installation of ramps, providing accessible signage, widening of toilet stalls, and installation...
28 CFR 36.304 - Removal of barriers.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., providing Brailled and raised character signage, widening doors, providing visual alarms, and installing... doors, installation of ramps, providing accessible signage, widening of toilet stalls, and installation...
28 CFR 36.304 - Removal of barriers.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., providing Brailled and raised character signage, widening doors, providing visual alarms, and installing... doors, installation of ramps, providing accessible signage, widening of toilet stalls, and installation...
McCoy, Mary A; Roper, Carey; Campa, Emily; Stephens-Stidham, Shelli; Carlin, Debra K; Istre, Gregory R
2014-04-01
To assess the functionality of lithium-powered smoke alarms that had been installed through a community-based programme called Operation Installation (OI). A random sample was chosen of homes that had received smoke alarms through OI, 2, 4, 6, 8 and 10 years previously. Sampled homes were visited, and information collected included functional status of smoke alarms. For homes in the 6-, 8- and 10-year sample, smoke alarms were removed and tested for battery and alarm function. 800 homes were included in the survey results; 1884 smoke alarms had been installed through OI. The proportion of homes that had at least one functioning OI smoke alarm ranged from 91.8% for year 2 sample to 19.8% for year 10. Of the originally installed smoke alarms in year 10 sample, 45.5% had been removed and 59% (64/108) of those that were still installed were not functioning. Multivariate analysis showed that the presence of at least one working alarm in the home was associated positively with the number of smoke alarms that were originally installed and whether the original occupant was still living in the home, and negatively with the length of time since the smoke alarm was installed, and whether there was a smoker in the home. Testing of the smoke alarms revealed that most non-functioning alarms had missing or dead batteries. Less than a quarter of the originally installed smoke alarms were still present and functioning by year 10. These findings have important implications for smoke alarm installation programmes.
Effects of Nacelle configuration/position on performance of subsonic transport
NASA Technical Reports Server (NTRS)
Bangert, L. H.; Krivec, D. K.; Segall, R. N.
1983-01-01
An experimental study was conducted to explore possible reductions in installed propulsion system drag due to underwing aft nacelle locations. Both circular (C) and D inlet cross section nacelles were tested. The primary objectives were: to determine the relative installed drag of the C and D nacelle installations; and, to compare the drag of each aft nacelle installation with that of a conventional underwing forward, drag of each aft nacelle installation with that of a conventional underwing forward, pylon mounted (UTW) nacelle installation. The tests were performed in the NASA-Langley Research Center 16-Foot Transonic Wind Tunnel at Mach numbers from 0.70 to 0.85, airplane angles of attack from -2.5 to 4.1 degrees, and Reynolds numbers per foot from 3.4 to 4.0 million. The nacelles were installed on the NASA USB full span transonic transport model with horizontal tail on. The D nacelle installation had the smallest drag of those tested. The UTW nacelle installation had the largest drag, at 6.8 percent larger than the D at Mach number 0.80 and lift coefficient (C sub L) 0.45. Each tested configuration still had some interference drag, however. The effect of the aft nacelles on airplane lift was to increase C sub L at a fixed angle of attack relative to the wing body. There was higher lift on the inboard wing sections because of higher pressures on the wing lower surface. The effects of the UTW installation on lift were opposite to those of the aft nacelles.
Reconfigurable wireless monitoring systems for bridges: validation on the Yeondae Bridge
NASA Astrophysics Data System (ADS)
Kim, Junhee; Lynch, Jerome P.; Zonta, Daniele; Lee, Jong-Jae; Yun, Chung-Bang
2009-03-01
The installation of a structural monitoring system on a medium- to large-span bridge can be a challenging undertaking due to high system costs and time consuming installations. However, these historical challenges can be eliminated by using wireless sensors as the primary building block of a structural monitoring system. Wireless sensors are low-cost data acquisition nodes that utilize wireless communication to transfer data from the sensor to the data repository. Another advantageous characteristic of wireless sensors is their ability to be easily removed and reinstalled in another sensor location on the same structure; this installation modularity is highlighted in this study. Wireless sensor nodes designed for structural monitoring applications are installed on the 180 m long Yeondae Bridge (Korea) to measure the dynamic response of the bridge to controlled truck loading. To attain a high nodal density with a small number (20) of wireless sensors, the wireless sensor network is installed three times with each installation concentrating sensors in one portion of the bridge. Using forced and free vibration response data from the three installations, the modal properties of the bridge are accurately identified. Intentional nodal overlapping of the three different sensor installations allows mode shapes from each installation to be stitched together into global mode shapes. Specifically, modal properties of the Yeondae Bridge are derived off-line using frequency domain decomposition (FDD) modal analysis methods.
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less
NASA Technical Reports Server (NTRS)
1980-01-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-17
.../E Aerospace Oxygen Cylinders as Installed on Various 14 CFR Part 23 and CAR 3 Airplanes AGENCY... and B/E Aerospace oxygen cylinders, as installed on various 14 CFR part 23 or CAR 3 airplanes. This... installed on various 14 CFR part 23 or CAR 3 airplanes and aircraft certificated in other categories. The...
Code of Federal Regulations, 2012 CFR
2012-07-01
... installing stationary CI ICE produced in previous model years? 60.4208 Section 60.4208 Protection of... or installing stationary CI ICE produced in previous model years? (a) After December 31, 2008, owners and operators may not install stationary CI ICE (excluding fire pump engines) that do not meet the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... installing stationary CI ICE produced in previous model years? 60.4208 Section 60.4208 Protection of... or installing stationary CI ICE produced in previous model years? (a) After December 31, 2008, owners and operators may not install stationary CI ICE (excluding fire pump engines) that do not meet the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... installing stationary CI ICE produced in previous model years? 60.4208 Section 60.4208 Protection of... or installing stationary CI ICE produced in previous model years? (a) After December 31, 2008, owners and operators may not install stationary CI ICE (excluding fire pump engines) that do not meet the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... installing stationary CI ICE produced in the previous model year? 60.4208 Section 60.4208 Protection of... or installing stationary CI ICE produced in the previous model year? (a) After December 31, 2008, owners and operators may not install stationary CI ICE (excluding fire pump engines) that do not meet the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... installing stationary CI ICE produced in the previous model year? 60.4208 Section 60.4208 Protection of... or installing stationary CI ICE produced in the previous model year? (a) After December 31, 2008, owners and operators may not install stationary CI ICE (excluding fire pump engines) that do not meet the...
NASA Astrophysics Data System (ADS)
1980-09-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
Installation package for a sunspot cascade solar water heating system
NASA Technical Reports Server (NTRS)
1980-01-01
Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
OShaughnessy, Eric J
Competition among residential solar photovoltaic (PV) installers may reduce PV price markups and yield lower prices. At the same time, competition may reduce installer experience and opportunities for cost reductions through learning-by-doing and economies of scale. These dynamics suggest that PV non-hardware or 'soft' costs and installed prices depend on the distribution of market shares among installers, also known as market concentration. This study leverages a rich data set of 226,769 residential PV systems to examine the relationship between market concentration, soft costs, and PV prices. The results show that PV prices are lower, on average, in more concentrated markets,more » i.e., markets with fewer installers or where few installers hold high market share. The study provides evidence that this relationship is non-linear, such that prices are minimized in markets with an optimal balance of the benefits of market concentration and the benefits of competition.« less
Voltage dips at the terminals of wind power installations
NASA Astrophysics Data System (ADS)
Bollen, Math H. J.; Olguin, Gabriel; Martins, Marcia
2005-07-01
This article gives an overview of the kind of voltage dips that can be expected at the terminals of a wind power installation. The overview is based on the study of those dips at the terminals of industrial installations and provides a guideline for the testing of wind power installations against voltage dips. For voltage dips due to faults, a classification into different types is presented. Five types appear at the terminals of sensitive equipment and thus have to be included when testing the wind power installation against disturbances coming from the grid. A distinction is made between installations connected at transmission level and those connected at distribution level. For the latter the phase angle jump has to be considered. Dips due to other causes (motor, transformer and capacitor switching) are briefly discussed as well as the voltage recovery after a dip. Finally some thoughts are presented on the way in which voltage tolerance requirements should be part of the design process for wind power installations. Copyright
Comparison of safety equipment between London underground and Beijing subway
NASA Astrophysics Data System (ADS)
Chen, T.; Zhang, S. Y.; Zhao, L. Z.; Xia, J. J.; Fu, X. C.; Bao, Z. M.; Chen, Y.; Zhang, X. Z.; Wang, R. J.; Hu, C.; Jing, L. S.; Wang, Y.
2017-06-01
The purpose of this paper was to improve the safety equipment’s effectiveness through the comparison. Firstly, the history and safety accident of London Underground and Beijing Subway were shown. Secondly, fire equipment between these two cities was compared including station’s hardware installations and carriage’s hardware installations. Thirdly, the relative software installations were also compared such as emergency drills. The results showed that Beijing Subway’s hardware installations were better than London. However, London Underground’s some installations were more effective than Beijing. Both cities would pay more attention on anti-terrorist in tunnel.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Naval Installations and Property in Puerto Rico § 770.37 Background. In accordance with 32 CFR 765.4, Naval installations and properties in Puerto Rico...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Naval Installations and Property in Puerto Rico § 770.37 Background. In accordance with 32 CFR 765.4, Naval installations and properties in Puerto Rico...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
24 CFR 3285.3 - Alterations during initial installation.
Code of Federal Regulations, 2012 CFR
2012-04-01
... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.3 Alterations... Model Installation Standards, the MHCSS (24 CFR part 3280) and the Manufactured Home Procedural and...
Kuadima, Joseph J; Timinao, Lincoln; Naidi, Laura; Tandrapah, Anthony; Hetzel, Manuel W; Czeher, Cyrille; Pulford, Justin
2017-02-28
This study examined the acceptability, durability and bio-efficacy of pyrethroid-impregnated durable lining (DL) over a three-year period post-installation in residential homes across Papua New Guinea (PNG). ZeroVector ® ITPS had previously been installed in 40 homes across four study sites representing a cross section of malaria transmission risk and housing style. Structured questionnaires, DL visual inspections and group interviews (GIs) were completed with household heads at 12- and 36-months post-installation. Three DL samples were collected from all households in which it remained 36-months post-installation to evaluate the bio-efficacy of DL on Anopheles mosquitoes. Bio-efficacy testing followed WHO guidelines for the evaluation of indoor residual spraying. The DL was still intact in 86 and 39% of study homes at the two time periods, respectively. In homes in which the DL was still intact, 92% of household heads considered the appearance at 12-months post installation to be the same as, or better than, that at installation compared to 59% at 36-months post-installation. GIs at both time points confirmed continuing high acceptance of DL, based in large part of the perceived attractiveness and functionality of the material. However, participants frequently asserted that they, or their family members, had ceased or reduced their use of mosquito nets as a result of the DL installation. A total of 16 houses were sampled for bio-efficacy testing across the 4 study sites at 36-months post-installation. Overall, combining all sites and samples, both knock-down at 30 min and mortality at 24 h were 100%. The ZeroVector ® DL installation remained highly acceptable at 36-months post-installation, the material and fixtures proved durable and the efficacy against malaria vectors did not decrease. However, the DL material had been removed from over 50% of the original study homes 3 years post-installation, largely due to deteriorating housing infrastructure. Furthermore, the presence of the DL installation appeared to reduce ITN use among many participating householders. The study findings suggest DL may not be an appropriate vector control method for large-scale use in the contemporary PNG malaria control programme.
32 CFR 770.39 - Entry procedures.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Naval Installations and Property in Puerto Rico... entry upon any U.S. Naval installation or property in Puerto Rico from the Commanding Officer of the...
32 CFR 770.39 - Entry procedures.
Code of Federal Regulations, 2011 CFR
2011-07-01
... ACCESS TO PARTICULAR INSTALLATIONS Entry Regulations for Naval Installations and Property in Puerto Rico... entry upon any U.S. Naval installation or property in Puerto Rico from the Commanding Officer of the...
Evaluation of antistripping additives.
DOT National Transportation Integrated Search
1989-01-01
Several chemical antistripping additives were used in field installations and compared to a similar installation using hydrated lime. The performance of the installations was monitored periodically, and material that was sampled during construction w...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-05
... Impact (FONSI) for the Installation of a Small Wind Turbine at the Pine Ridge Job Corps Center Located at...: Preliminary Finding of No Significant Impact (FONSI) for a small Wind Turbine Installation to be located at... prepared for a proposed Wind Turbine Installation to be located at the Pine Ridge Job Corps Center, 15710...
Environmental Compliance Assessment System (ECAS)
1993-09-01
hazardous waste onsite? How and where? 8. Do satellite/offpost facilitiesminstallations (i.e., USARCs) transport hazardous wastes to the installation...Contractor ? In-house personnel_ ? 3. Is waste transported off-installation for disposal: a. In landfills? b. In incinerators? c. Transfer stations? d...Does the installation dispose of PCBs or PCB items at the installation? 4. Does the facility transport PCBs? 5. Is there a working management system
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musyurka, A. V., E-mail: musyurkaav@burges.rushydro.ru
This article presents the design, hardware, and software solutions developed and placed in service for the automated system of diagnostic monitoring (ASDM) for hydraulic engineering installations at the Bureya HPP, and assuring a reliable process for monitoring hydraulic engineering installations. Project implementation represents a timely solution of problems addressed by the hydraulic engineering installation diagnostics section.
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Equipment Installations § 32.20-1 Equipment installations on vessels during World War II—TB/ALL....
Code of Federal Regulations, 2014 CFR
2014-07-01
... installing stationary SI ICE produced in previous model years? 60.4236 Section 60.4236 Protection of... installing stationary SI ICE produced in previous model years? (a) After July 1, 2010, owners and operators may not install stationary SI ICE with a maximum engine power of less than 500 HP that do not meet the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... installing stationary SI ICE produced in the previous model year? 60.4236 Section 60.4236 Protection of... installing stationary SI ICE produced in the previous model year? (a) After July 1, 2010, owners and operators may not install stationary SI ICE with a maximum engine power of less than 500 HP that do not meet...
Code of Federal Regulations, 2012 CFR
2012-07-01
... installing stationary SI ICE produced in previous model years? 60.4236 Section 60.4236 Protection of... installing stationary SI ICE produced in previous model years? (a) After July 1, 2010, owners and operators may not install stationary SI ICE with a maximum engine power of less than 500 HP that do not meet the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... installing stationary SI ICE produced in the previous model year? 60.4236 Section 60.4236 Protection of... installing stationary SI ICE produced in the previous model year? (a) After July 1, 2010, owners and operators may not install stationary SI ICE with a maximum engine power of less than 500 HP that do not meet...
Code of Federal Regulations, 2013 CFR
2013-07-01
... installing stationary SI ICE produced in previous model years? 60.4236 Section 60.4236 Protection of... installing stationary SI ICE produced in previous model years? (a) After July 1, 2010, owners and operators may not install stationary SI ICE with a maximum engine power of less than 500 HP that do not meet the...
Installation Management Command: How is the Command Supporting the Army Plan?
2007-03-27
BRAC), Global Defense Posture Realignment ( GDPR ), and Army Modular Force (AMF). IMCOM will continue to consolidate installations functions to free up...This restationing effort resides in three initiatives: Base Realignment and Closure (BRAC), Global Defense Posture Realignment ( GDPR ), and the Army...training on our installations.”36 The GDPR consolidates forces returning from overseas into selected CONUS installations. AMF has restructured the
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
Code of Federal Regulations, 2010 CFR
2010-04-01
... dealer's cost of purchasing and installing a central air conditioning system or heat pump, if not... cost of purchasing and installing a central air conditioning system or heat pump, if not installed by...
46 CFR 176.702 - Installation tests and inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...
Hot tap thermowell installation
NASA Technical Reports Server (NTRS)
Romero, C. A.
1971-01-01
System permits valve housings or other fillings to be installed in live steam lines or water pipes without interrupting their operation, thus eliminating current tapping restrictions. Two basic assemblies for installation under pressure are described.
NASA Technical Reports Server (NTRS)
Mengle, Vinod G.; Elkoby, Ronen; Brusniak, Leon; Thomas, Russ H.
2006-01-01
Propulsion airframe aeroacoustic (PAA) interactions arise due to the manner in which an engine is installed on the airframe and lead to an asymmetry in the flow/acoustic environment, for example, for under-the-wing installations due to the pylon, the wing and the high-lift devices. In this work we study how we can affect these PAA interactions to reduce the overall jet-related installed noise by tailoring the chevron shapes on fan and core nozzles in a unique fashion to take advantage of this asymmetry. In part 1 of this trio of papers we introduced the concept of azimuthally varying chevrons (AVC) and showed how some types of AVCs can be more beneficial than the conventional chevrons when tested on "isolated" scaled nozzles inclusive of the pylon effect. In this paper, we continue to study the effect of installing these AVC nozzles under a typical scaled modern wing with high-lift devices placed in a free jet. The noise benefits of these installed nozzles, as well as their installation effects are systematically studied for several fan/core AVC combinations at typical take-off conditions with high bypass ratio. We show, for example, that the top-enhanced mixing T-fan AVC nozzle (with enhanced mixing near the pylon and less mixing away from it) when combined with conventional chevrons on the core nozzle is quieter than conventional chevrons on both nozzles, and hardly produces any high-frequency lift, just as in the isolated case; however, its installed nozzle benefit is less than its isolated nozzle benefit. This suppression of take-off noise benefit under installed conditions, compared to its isolated nozzle benefit, is seen for all other chevron nozzles. We show how these relative noise benefits are related to the relative installation effects of AVCs and baseline nozzles.
Effects of Large-Scale Solar Installations on Dust Mobilization and Air Quality
NASA Astrophysics Data System (ADS)
Pratt, J. T.; Singh, D.; Diffenbaugh, N. S.
2012-12-01
Large-scale solar projects are increasingly being developed worldwide and many of these installations are located in arid, desert regions. To examine the effects of these projects on regional dust mobilization and air quality, we analyze aerosol product data from NASA's Multi-angle Imaging Spectroradiometer (MISR) at annual and seasonal time intervals near fifteen photovoltaic and solar thermal stations ranging from 5-200 MW (12-4,942 acres) in size. The stations are distributed over eight different countries and were chosen based on size, location and installation date; most of the installations are large-scale, took place in desert climates and were installed between 2006 and 2010. We also consider air quality measurements of particulate matter between 2.5 and 10 micrometers (PM10) from the Environmental Protection Agency (EPA) monitoring sites near and downwind from the project installations in the U.S. We use monthly wind data from the NOAA's National Center for Atmospheric Prediction (NCEP) Global Reanalysis to select the stations downwind from the installations, and then perform statistical analysis on the data to identify any significant changes in these quantities. We find that fourteen of the fifteen regions have lower aerosol product after the start of the installations as well as all six PM10 monitoring stations showing lower particulate matter measurements after construction commenced. Results fail to show any statistically significant differences in aerosol optical index or PM10 measurements before and after the large-scale solar installations. However, many of the large installations are very recent, and there is insufficient data to fully understand the long-term effects on air quality. More data and higher resolution analysis is necessary to better understand the relationship between large-scale solar, dust and air quality.
Performance of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...
Design and installation package for a solar powered pump
NASA Technical Reports Server (NTRS)
1978-01-01
The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.
UKIRT Upgrades Program: design and installation of the Dome Ventilation System (DVS)
NASA Astrophysics Data System (ADS)
Neff, D. H.; Hileman, Edward A.; Kain, S. J.; Cavedoni, Charles P.; Chuter, Timothy C.
1997-03-01
In order to encourage adequate dome ventilation to reduce or eliminate dome seeing at the 3.8 m United Kingdom Infrared Telescope (UKIRT), a dome ventilation system (DVS) was designed to be installed in the lower dome skirt. The modifications to the dome for the new DVS apertures consisted of installing a reinforcing frame containing an insulated rollup door and adjustable louvers. This paper describes the finite element structural analysis of the reinforcing frame, the detailed design of the frame hardware, the design of the programmable language control (PLC) system for controlling the opening and closing of the rollup doors, and the fabrication and installation of a prototype frame assembly. To date, a prototype assembly has been installed that confirms the design, and fifteen production assemblies are currently under fabrication for installation by September 1996.
North American Board of Certified Energy Practitioners Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, Richard
The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less
Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion
2016-06-01
ENGINEERING GUIDANCE REPORT Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion ESTCP Project ER-200933 JUNE...Defense. Page Intentionally Left Blank Renewable Energy Production From DoD Installation Solid Wastes by Anaerobic Digestion ii June 2016 REPORT...3. DATES COVERED (2009 – 2016) 4. TITLE AND SUBTITLE Renewable Energy Production from DoD Installation Solid Wastes by Anaerobic Digestion 5a
The Evolving Market Structure of the U.S. Residential Solar PV Installation
Solar PV Installation Industry, 2000-2016 The Evolving Market Structure of the U.S. Residential Solar PV residential solar photovoltaic (PV) system and that the residential PV installation industry has become more concentrated over time. From 2000 to 2016, the U.S. residential solar photovoltaic (PV) installation industry
Code of Federal Regulations, 2010 CFR
2010-04-01
... section applies only to dealers and only with respect to their sales on the installment plan. (b) Time and... the first taxable year in which sales are made on an installment plan of any kind must indicate in the... election made only one type of sale on the installment plan, but during a subsequent taxable year makes...
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
2018-01-30
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
O’Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naïm
The solar photovoltaic (PV) installation industry comprises thousands of firms around the world who collectively installed nearly 200 million panels in 2015. Spatial analysis of the emerging industry has received considerable attention from the literature, especially on the demand side concerning peer effects and adopter clustering. However this research area does not include similarly sophisticated spatial analysis on the supply side of the installation industry. The lack of understanding of the spatial structure of the PV installation industry leaves PV market research to rely on jurisdictional lines, such as counties, to define geographic PV markets. We develop an approach thatmore » uses the spatial distribution of installers' activity to define geographic boundaries for PV markets. Our method is useful for PV market research and applicable in the contexts of other industries. We use our approach to demonstrate that the PV industry in the United States is spatially heterogeneous. Despite the emergence of some national-scale PV installers, installers are largely local and installer communities are unique from one region to the next. The social implications of the spatial heterogeneity of the emerging PV industry involve improving understanding of issues such as market power, industry consolidation, and how much choice potential adopters have.« less
The capitalized value of rainwater tanks in the property market of Perth, Australia
NASA Astrophysics Data System (ADS)
Zhang, Fan; Polyakov, Maksym; Fogarty, James; Pannell, David J.
2015-03-01
In response to frequent water shortages, governments in Australia have encouraged home owners to install rainwater tanks, often by provision of partial funding for their installation. A simple investment analysis suggests that the net private benefits of rainwater tanks are negative, potentially providing justification for funding support for tank installation if it results in sufficiently large public benefits. However, using a hedonic price analysis we estimate that there is a premium of up to AU18,000 built into the sale prices of houses with tanks installed. The premium is likely to be greater than the costs of installation, even allowing for the cost of time that home owners must devote to research, purchase and installation. The premium is likely to reflect non-financial as well as financial benefits from installation. The robustness of our estimated premium is investigated using both bounded regression analysis and simulation methods and the result is found to be highly robust. The policy implication is that governments should not rely on payments to encourage installation of rainwater tanks, but instead should use information provision as their main mechanism for promoting uptake. Several explanations for the observation that many home owners are apparently leaving benefits on the table are canvased, but no fully satisfactory explanation is identified.
Performance evaluation of buried pipe installation.
DOT National Transportation Integrated Search
2010-05-01
The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...
Utility installation review system : implementation report.
DOT National Transportation Integrated Search
2009-03-01
Each year, the Texas Department of Transportation (TxDOT) issues thousands of approvals that enable new : utility installations to occupy the state right of way (ROW). The current utility installation review process : relies on the physical delivery ...
Blind-Anchor-Nut-Installation Fixture (BANIF)
NASA Technical Reports Server (NTRS)
Willey, Norman F., Jr.; Linker, James F.
1994-01-01
Blind-anchor-nut-installation fixture, BANIF, developed for replacing or installing anchor nuts in blind holes or other inaccessible places. Attachment of anchor nut to BANIF enables placement of anchor nut on blind side of component.
30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.
Code of Federal Regulations, 2012 CFR
2012-07-01
... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...
30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.
Code of Federal Regulations, 2013 CFR
2013-07-01
... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...
30 CFR 250.1003 - Installation, testing, and repair requirements for DOI pipelines.
Code of Federal Regulations, 2014 CFR
2014-07-01
... obstructions. (4) Pipeline risers installed after April 1, 1988, shall be protected from physical damage that could result from contact with floating vessels. Riser protection on pipelines installed on or before...
Installation package for a solar heating system
NASA Technical Reports Server (NTRS)
1978-01-01
Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.
2016 End of the year South Carolina PV soft cost and workforce development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Elise B.; Edwards, Thomas B.; Drory, Michael D.
2017-08-16
A solar industry survey was given to professional installers who serve the South Carolina market in order to determine trends in costing, work force needs, and business demographics at the end of 2016. It was found that 70% of the respondents serve the residential sector, while only 7% of the total exclusively serves the residential market. The average size of residential installations remain near 9 kW-DC, while the average size of commercial and utility scale installations continue to grow to 378 kW-DC and 14.8 MW-DC, respectively. The total cost of these residential systems has hovered around $3.50/W-DC since the endmore » of 2015, while commercial installations have dropped to $2.45/W-DC and utility scale installations have dropped to $1.49/W-DC. It is expected that the cost of utility scale installations will continue to drop as there are publically reported utility scale installations with contracted PPAs for less than 4¢/kWh. 52-60% of the cost is associated with hardware only depending upon sector.« less
Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan
2016-07-01
The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.
Application-Program-Installer Builder
NASA Technical Reports Server (NTRS)
Wolgast, Paul; Demore, Martha; Lowik, Paul
2007-01-01
A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.
Evaluation of Installation Time for SMASHmount by SMASHsolar
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewablemore » Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.« less
A statistical evaluation of formation disturbance produced by well- casing installation methods
Morin, R.H.; LeBlanc, D.R.; Teasdale, W.E.
1988-01-01
Water-resources investigations concerned with contaminant transport through aquifers comprised of very loose, unconsolidated sediments have shown that small-scale variations in aquifer characteristics can significantly affect solute transport and dispersion. Commonly, measurement accuracy and resolution have been limited by a borehole environment consisting of an annulus of disturbed sediments produced by the casing-installation method. In an attempt to quantify this disturbance and recognize its impact on the characterization of unconsolidated deposits, three installation methods were examined and compared in a sand-and-gravel outwash at a test site on Cape Cod, Massachusetts. These installation methods were: 1) casing installed in a mud-rotary hole; 2) casing installed in an augered hole; and 3) flush-joint steel casing hammer-driven from land surface. Fifteen wells were logged with epithermal neutron and natural gamma tools. Concludes that augering is the most disruptive of the three casing-installation methods and that driving casing directly, though typically a more time-consuming operation, transmits the least amount of disturbance into the surrounding formation. -from Authors
Shaft Seal Compensates for Cold Flow
NASA Technical Reports Server (NTRS)
Myers, W. N.; Hein, L. A.
1985-01-01
Seal components easy to install. Ring seal for rotating or reciprocating shafts spring-loaded to compensate for slow yielding (cold flow) of sealing material. New seal relatively easy to install because components preassembled, then installed in one piece.
Installation and Test of Doppler Acoustic Sensor
DOT National Transportation Integrated Search
1977-12-01
This report presents details of the installation of a Doppler acoustic vortex sensing system at JFK Runway 31R, the hardware and software improvements made since installation, vortex diagnostic and tracking data and analysis, and conclusions and reco...
Installation of surface-mounted flat-conductor cable
NASA Technical Reports Server (NTRS)
Carden, J. R.
1976-01-01
Guide describes step-by-step process for installation of interior surface-mounted FCC used in commerical and residential buildings. Photographs illustrate how cable-riser and baseboard covers are installed as well as receptacle assembly and receptacle-cover replacement.
Rumble strips installation on thin pavement overlays.
DOT National Transportation Integrated Search
2014-09-01
The purpose of this project was to establish a synthesis of best practices from various state and other transportation agency stakeholders regarding the installation and re-installation of rumble strips on pavements treated with a thin pavement overl...
Utility installation review (UIR) system training materials.
DOT National Transportation Integrated Search
2008-10-01
The Texas Department of Transportation (TxDOT) issues thousands of approvals every year that : enable new utility installations to occupy the state right-of-way (ROW). The utility installation : review process currently in place is manual, tedious, a...
Development of guidelines for the installation of marked crosswalks.
DOT National Transportation Integrated Search
2004-01-01
The Manual on Uniform Traffic Control Devices (MUTCD) provides little guidance on the installation of marked crosswalks, especially at locations other than intersections, i.e., mid-block locations. Crosswalks have typically been installed and designe...
Climate Risk Assessment: Technical Guidance Manual for DoD Installations and Built Environment
2016-09-06
climate change risks to DoD installations and the built environment. The approach, which we call “decision-scaling,” reveals the core sensitivity of...DoD installations to climate change . It is designed to illuminate the sensitivity of installations and their supporting infrastructure systems...including water and energy, to climate changes and other uncertainties without dependence on climate change projections. In this way the analysis and
Installation package for air flat plate collector
NASA Technical Reports Server (NTRS)
1977-01-01
The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.
Installing and Setting Up the Git Software Tool on OS X | High-Performance
Computing | NREL the Git Software Tool on OS X Installing and Setting Up the Git Software Tool on OS X Learn how to install the Git software tool on OS X for use with the Peregrine system. You can . Binary Installer for OS X - Easiest! You can download the latest version of git from http://git-scm.com
Transport and installation of the Dark Energy Survey CCD imager
NASA Astrophysics Data System (ADS)
Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken
2012-09-01
The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.
Menéndez, Cammie Chaumont; Amandus, Harlan; Damadi, Parisa; Wu, Nan; Konda, Srinivas; Hendricks, Scott
2014-05-01
Driving a taxicab remains one of the most dangerous occupations in the United States, with leading homicide rates. Although safety equipment designed to reduce robberies exists, it is not clear what effect it has on reducing taxicab driver homicides. Taxicab driver homicide crime reports for 1996 through 2010 were collected from 20 of the largest cities (>200,000) in the United States: 7 cities with cameras installed in cabs, 6 cities with partitions installed, and 7 cities with neither cameras nor partitions. Poisson regression modeling using generalized estimating equations provided city taxicab driver homicide rates while accounting for serial correlation and clustering of data within cities. Two separate models were constructed to compare (1) cities with cameras installed in taxicabs versus cities with neither cameras nor partitions and (2) cities with partitions installed in taxicabs versus cities with neither cameras nor partitions. Cities with cameras installed in cabs experienced a significant reduction in homicides after cameras were installed (adjRR = 0.11, CL 0.06-0.24) and compared to cities with neither cameras nor partitions (adjRR = 0.32, CL 0.15-0.67). Cities with partitions installed in taxicabs experienced a reduction in homicides (adjRR = 0.78, CL 0.41-1.47) compared to cities with neither cameras nor partitions, but it was not statistically significant. The findings suggest cameras installed in taxicabs are highly effective in reducing homicides among taxicab drivers. Although not statistically significant, the findings suggest partitions installed in taxicabs may be effective.
24 CFR 3286.511 - Inspector qualifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered... a manufactured home that is subject to the requirements of the HUD-administered installation program: (1) A manufactured home or residential building inspector employed by the local authority having...
Code of Federal Regulations, 2013 CFR
2013-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
Code of Federal Regulations, 2014 CFR
2014-07-01
... wiring. Installations of other outside conductors on the premises. (4) Optical fiber cable. Installations of optical fiber cable where such installations are made along with electric conductors. Note: See... of utilization equipment used for purposes other than generating, transmitting, or distributing...
24 CFR 3286.413 - Recordkeeping.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Recordkeeping. 3286.413 Section 3286.413 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in HUD...
FIELD STUDIES OF GEOMEMBRANE INSTALLATION TECHNIQUES
Fourteen construction sites where geomembranes were being installed were visited to observe subgrade preparation and liner installation techniques. These sites were visited during a study conducted for the U.S. EPA, Solid and Hazardous Waste Research Division. The sites included ...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations used for the generation, transmission, and distribution of electric energy, including related...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These...
Effects of installation caused flow distortion on noise from a fan designed for turbofan engines
NASA Technical Reports Server (NTRS)
Povinelli, F. P.; Dittmar, J. H.; Woodward, R. P.
1972-01-01
Far-field noise measurements were taken for three different installations of essentially the same fan. The installation with the most uniform inlet flow resulted in fan-blade-passage tone sound pressure levels more than 10 dB lower than the installation with more nonuniform inflow. Perceived noise levels were computed for the various installations and compared. Some measurements of inlet flow distortion were made and used in a blade-passage noise generation theory to predict the effects of distortion on noise. Good agreement was obtained between the prediction and the measured effect. Possible origins of the distortion were identified by observation of tuft action in the vicinity of the inlet.
Integrated residential photovoltaic array development
NASA Technical Reports Server (NTRS)
Shepard, N. F., Jr.
1981-01-01
Three basic module design concepts were analyzed with respect to both production and installation costs. The results of this evaluation were used to synthesize a fourth design which incorporates the best features of these initial concepts to produce a module/array design approach which offers the promise of a substantial reduction in the installed cost of a residential array. A unique waterproofing and mounting scheme was used to reduce the cost of installing an integral array while still maintaining a high probability that the installed array will be watertight for the design lifetime of the system. This recommended concept will also permit the array to be mounted as a direct or stand-off installation with no changes to the module design.
2007-01-01
software applications and rely on the installations to supply them with the basic I&E geospatial data - sets for those applications. Such...spatial data in geospatially based tools to help track military supplies and materials all over the world. For instance, SDDCTEA developed IRRIS, a...regional offices or individual installations to supply the data and perform QA/QC in the process. The IVT program office worked with the installations and
NASA Technical Reports Server (NTRS)
Barbieri, R. H.; Schoen, R.; Hirshberg, A. S.
1978-01-01
Utilization requirements are given and comparisons made of two phase III SAGE (solar assisted gas energy) installations in California: (1) a retrofit installation in an existing apartment building in El Toro, and (2) an installation in a new apartment building in Upland. Such testing in the field revealed the requirements to be met if SAGE-type installations are to become commercially practical on a widespread basis in electric and gas energy usage.
An Automatic System of Testing the Best Stress of Installation for Semiconductor Refrigeration Piece
NASA Astrophysics Data System (ADS)
Chen, Hongyan; Song, Ping
Concerning the problems of the impact on the factors of installation about semiconductor refrigeration piece are rarely studied in China and abroad, a reasonable structure of test device is designed, using stepper motor to test the temperature of the cold surface under different stress of installation to get the best stress of installation for the semiconductor refrigeration piece. Experiments shows that the system is of good noise immunity, high controlling and measuring precision.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
A framework for sea level rise vulnerability assessment for southwest U.S. military installations
Chadwick, B.; Flick, Reinhard; Helly, J.; Nishikawa, Tracy; Pei, Fang Wang; O'Reilly, W.; Guza, R.; Bromirski, Peter; Young, A.; Crampton, W.; Wild, B.; Canner, I.
2011-01-01
We describe an analysis framework to determine military installation vulnerabilities under increases in local mean sea level as projected over the next century. The effort is in response to an increasing recognition of potential climate change ramifications for national security and recommendations that DoD conduct assessments of the impact on U.S. military installations of climate change. Results of the effort described here focus on development of a conceptual framework for sea level rise vulnerability assessment at coastal military installations in the southwest U.S. We introduce the vulnerability assessment in the context of a risk assessment paradigm that incorporates sources in the form of future sea level conditions, pathways of impact including inundation, flooding, erosion and intrusion, and a range of military installation specific receptors such as critical infrastructure and training areas. A unique aspect of the methodology is the capability to develop wave climate projections from GCM outputs and transform these to future wave conditions at specific coastal sites. Future sea level scenarios are considered in the context of installation sensitivity curves which reveal response thresholds specific to each installation, pathway and receptor. In the end, our goal is to provide a military-relevant framework for assessment of accelerated SLR vulnerability, and develop the best scientifically-based scenarios of waves, tides and storms and their implications for DoD installations in the southwestern U.S.
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
46 CFR 119.220 - Installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include: (1...
Targeting Net Zero Energy for Military Installations (Presentation)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burman, K.
2012-05-01
Targeting Net Zero Energy for Military Installations in Kaneohe Bay, Hawaii. A net zero energy installation (NZEI) is one that produces as much energy from on-site renewable sources as it consumes. NZEI assessment provides a systematic approach to energy projects.
29 CFR 1926.402 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Electrical Installation Safety Requirements § 1926.402... electrical equipment and installations used to provide electric power and light at the jobsite. These... commenced. Note: If the electrical installation is made in accordance with the National Electrical Code ANSI...
A field installation using prestressed panel subdecks.
DOT National Transportation Integrated Search
1978-01-01
This final report is a supplement to an earlier report that covered the installation of the first precast, prestressed panel subdecks installed on a bridge in Virginia. The report discusses the inspection of the decks one year after they were complet...
All of the WASP Installers are listed below. There is a 64 Bit Windows Installer, 64 Bit Mac OS X (Yosemite or Higher), 64 Bit Linux (Built on Ubuntu). You will need to have knowledge on how to install software on your target operating system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Surfaces § 25.655 Installation. (a...
14 CFR 33.29 - Instrument connection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... must make provision for the installation of instrumentation necessary to ensure operation in compliance... assumed aircraft installation, then the applicant must specify this instrumentation in the engine installation instructions and declare it mandatory in the engine approval documentation. (f) As part of the...
10 CFR 34.33 - Permanent radiographic installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...
10 CFR 34.33 - Permanent radiographic installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...
10 CFR 34.33 - Permanent radiographic installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...
10 CFR 34.33 - Permanent radiographic installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...
10 CFR 34.33 - Permanent radiographic installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Permanent radiographic installations. 34.33 Section 34.33 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Equipment § 34.33 Permanent radiographic installations. (a...
Code of Federal Regulations, 2014 CFR
2014-07-01
... COMMAND ASSISTANCE TEAM (FACAT) § 60.6 Procedures. (a) Reporting requirements. Any person with a... the number of potential victims and determine whether an installation response team may be appropriate...) Notify the installation commander of the allegation and recommend whether an installation response team...
XTE Solid Motor Installation at Pad 17-A, Cape Canaveral Air Station
NASA Technical Reports Server (NTRS)
1995-01-01
This NASA Kennedy Space Center video presents live footage of the installation of the XTE (X-Ray Timing Explorer) Solid Rocket Motor at Launch Pad 17-A. The installation takes place at Cape Canaveral Air Station, Florida.
MSFC inspections of installed polyimide wire
NASA Technical Reports Server (NTRS)
Landers, Joe C.
1994-01-01
An alert was issued because of the arc-tracking possibilities of installed polyimide wire harnesses. MSFC undertook a program to try to enhance the safety and reliability of these harnesses. Photographs are presented showing the need for inspections of installed wiring harnesses.
NASA Astrophysics Data System (ADS)
Hirahara, S.; Nakayama, T.; Hori, S.; Sato, T.; Chiba, Y.; Okada, T.; Matsuzawa, T.
2015-12-01
Soon after the 2011 Tohoku earthquake, seismic activity of Tohoku region, NE Japan is induced in the inland area of Akita prefecture and the border area between Fukushima and Yamagata prefectures. We plan to install a total of 80 offline seismic observation stations in these areas for studying the effect of megathrust earthquake on the activities of inland earthquakes. In our project, maintenance will be held twice-a-year for 4 years from 2015 by using 2.0Hz short-period 3-component seismometer, KVS-300 and ultra-low-power data logger, EDR-X7000 (DC12V 0.08W power supply). We installed seismometer on the rock surface or the slope of the natural ground at the possible sites confirmed with low noise level to obtain distinct seismic waveform data. We report an improvement in installation method of the offline seismic observation station in the heavy snowfall area of Tohoku region based on the retrieved data. In the conventional method, seismometer was installed in the hand-dug hole of a slope in case it is not waterproof. Data logger and battery were installed in the box container on the ground surface, and then, GPS antenna was installed on the pole fixed by stepladder. There are risks of the inclination of seismometer and the damage of equipment in heavy snowfall area. In the new method, seismometer is installed in the robust concrete box on the buried basement consists of precast concrete mass to keep its horizontality. Data logger, battery, and GPS antenna are installed on a high place by using a single pole with anchor bolt and a pole mount cabinet to enhance their safety. As a result, total costs of installation are kept down because most of the equipment is reusable. Furthermore, an environmental burden of waste products is reduced.
Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter
NASA Astrophysics Data System (ADS)
Hnat, J. A.
1980-07-01
This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.
14 CFR 25.967 - Fuel tank installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...
14 CFR 29.967 - Fuel tank installation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...
14 CFR 25.967 - Fuel tank installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...
14 CFR 29.967 - Fuel tank installation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...
14 CFR 25.967 - Fuel tank installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...
14 CFR 29.967 - Fuel tank installation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...
14 CFR 25.967 - Fuel tank installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...
14 CFR 25.967 - Fuel tank installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...
14 CFR 29.967 - Fuel tank installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...
14 CFR 29.967 - Fuel tank installation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
Code of Federal Regulations, 2011 CFR
2011-10-01
... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...
Minimization of reflection cracks, Route 17, Gloucester County : installation report 1976.
DOT National Transportation Integrated Search
1976-01-01
The installation of two fabrics, Petromat and Mirafi, to reduce reflection cracking on Route 17 in Gloucester County in- August 1976 is described. A brief review of the performance of previous installations is included. Finally, it is recommended tha...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS...) Axial and radial expansion of turbine engines may not affect the safety of the installation. (6) Design...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS...) Axial and radial expansion of turbine engines may not affect the safety of the installation. (6) Design...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS...) Axial and radial expansion of turbine engines may not affect the safety of the installation. (6) Design...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS...) Axial and radial expansion of turbine engines may not affect the safety of the installation. (6) Design...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Installation. 29.901 Section 29.901 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS...) Axial and radial expansion of turbine engines may not affect the safety of the installation. (6) Design...
Code of Federal Regulations, 2010 CFR
2010-10-01
... vehicles, motorized equipment, motorboats, aircraft, mechanical transport, structures, and installations..., mechanical transport, structures, and installations. Except as specifically provided and subject to existing... equipment, mechanical transport, aircraft, motorboats, installations, or structures may be used to meet the...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
14 CFR 25.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Electrical equipment and installations. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Electrical Systems and Equipment § 25.1353 Electrical equipment and installations. (a) Electrical equipment and controls must be...
14 CFR 29.1353 - Electrical equipment and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Electrical equipment and installations. 29... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Electrical Systems and Equipment § 29.1353 Electrical equipment and installations. (a) Electrical equipment, controls, and wiring...
32 CFR 637.3 - Installation Commander.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...
Installation of child safety seats in selected 1988-1989 model year automobiles
DOT National Transportation Integrated Search
1989-06-01
The study tested whether currently marketed child safety seats are difficult to install in current model automobiles. The study also tested whether once installed, the child seats remain securely fastened when rocked or tilted. Thirteen toddler and f...
24 CFR 3280.803 - Power supply.
Code of Federal Regulations, 2010 CFR
2010-04-01
...-Wiring Devices-Dimensional Specifications). (g) The overall length of a power-supply cord, measured from... supply shall be by means of: (1) One mast weatherhead installation installed in accordance with Article... underside of the manufactured home. The manufacturer shall provide in his written installation instructions...
INSTALLATION OF SPACELAB 1 MODULE AND EXPERIMENT PALLET INTO THE ORBITER COLUMBIA'S PAYLOAD BAY
NASA Technical Reports Server (NTRS)
1983-01-01
INSTALLATION OF SPACELAB 1 MODULE AND EXPERIMENT PALLET INTO THE ORBITER COLUMBIA'S PAYLOAD BAY KSC-383C-2862.09 P-16229,ARCHIVE-03950 Payload canister rolling into OPF, removal and installed into the Orbiter 102 payload bay.
42 CFR 84.196 - Harnesses; installation and construction; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Chemical Cartridge Respirators § 84.196 Harnesses; installation and construction; minimum...
DOT National Transportation Integrated Search
2013-04-01
WSDOT began installing rumble strips on undivided highways in 1999 as a countermeasure for roadway : departure crashes. Installations on the shoulders were intended to reduce run-off-the-road crashes, while : centerline rumble strips targeted reducti...
Crash history after installation of traffic signals : warranted vs. unwarranted.
DOT National Transportation Integrated Search
2008-01-01
The objective of this study was to determine the change in crash history at intersections after installation of a traffic signal. Signals installed based on the warrants from an engineering study resulted in a decrease in angle collisions with an inc...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
Installation of Ohio's First Electrolysis-Based Hydrogen Fueling Station
NASA Technical Reports Server (NTRS)
Scheidegger, Brianne T.; Lively, Michael L.
2012-01-01
This paper describes progress made towards the installation of a hydrogen fueling station in Northeast Ohio. In collaboration with several entities in the Northeast Ohio area, the NASA Glenn Research Center is installing a hydrogen fueling station that uses electrolysis to generate hydrogen on-site. The installation of this station is scheduled for the spring of 2012 at the Greater Cleveland Regional Transit Authority s Hayden bus garage in East Cleveland. This will be the first electrolysis-based hydrogen fueling station in Ohio.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-18
The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.
Measure Guideline: High Efficiency Natural Gas Furnaces
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brand, L.; Rose, W.
2012-10-01
This Measure Guideline covers installation of high-efficiency gas furnaces. Topics covered include when to install a high-efficiency gas furnace as a retrofit measure, how to identify and address risks, and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.
Measure Guideline. High Efficiency Natural Gas Furnaces
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brand, L.; Rose, W.
2012-10-01
This measure guideline covers installation of high-efficiency gas furnaces, including: when to install a high-efficiency gas furnace as a retrofit measure; how to identify and address risks; and the steps to be used in the selection and installation process. The guideline is written for Building America practitioners and HVAC contractors and installers. It includes a compilation of information provided by manufacturers, researchers, and the Department of Energy as well as recent research results from the Partnership for Advanced Residential Retrofit (PARR) Building America team.
1946-07-01
good distribution of cooling air, as well as minimum drag for the installation. The fact that these tests showed that the front recovery decreased...installations on engine cooling-air distribution indicates that good coin-elation of the cooling results of like engines in different installations...tests indicate that an important consider- ation in the design of cowlings and cowl flaps should be the obtaining of good distribution of cooling air
Improving Energy Security for Air Force Installations
NASA Astrophysics Data System (ADS)
Schill, David
Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.
The Land-Use Efficiency of Big Solar
NASA Astrophysics Data System (ADS)
Hernandez, R. R.; Hoffacker, M.; Field, C. B.
2013-12-01
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy, however, the land-use efficiency (LUE; Wm-2) of USSE remains unknown. We quantified the nominal LUE of 183 USSE installations (> 20 megawatts; planned, under construction, and operating) using California as a case study. In California, we found that USSE installations are concentrated in the Central Valley and desert interior of southern California and have a LUE of 35.01 Wm-2. The installations comprise approximately 86,000 hectares (ha) and more land is allocated for photovoltaic schemes (72,294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.83 Wm-2) than installations on public land (25.42 Wm-2). We show how LUE can be improved and how co-benefit opportunities can be integrated with USSE enterprises to maximize their economic, energetic, and environmental returns on investment. (Left) The distribution of utility-scale solar energy installations in California (constructed and in progress) by technology type: concentrating solar power and photovoltaic with county lines shown. (Right) The distribution of utility-scale solar energy installations in California (constructed and in progress) by location: public or privately owned land. Larger capacity installations (megawatts) have relatively greater point size.
García-Pérez, Javier; López-Cima, María Felicitas; Boldo, Elena; Fernández-Navarro, Pablo; Aragonés, Nuria; Pollán, Marina; Pérez-Gómez, Beatriz; López-Abente, Gonzalo
2010-10-01
Releases to the environment of toxic substances stemming from industrial metal production and processing installations can pose a health problem to populations in their vicinity. To investigate whether there might be excess leukemia-related mortality in populations residing in towns in the vicinity of Spanish metal industries included in the European Pollutant Emission Register. Ecologic study designed to examine mortality due to leukemia at a municipal level, during the period 1994-2003. Population exposure to pollution was estimated on the basis of distance from town of residence to pollution source. Using Poisson regression models, we analyzed: risk of dying from leukemia in a 5-kilometer zone around installations which had become operational prior to 1990; effect of pollution discharge route and type of industrial activity; and risk gradient within a 50-kilometer radius of such installations. Excess mortality (relative risk, 95% confidence interval) was detected in the vicinity of pre-1990 installations (1.07, 1.02-1.13 in men; 1.05, 1.00-1.11 in women), with this being more elevated in the case of installations that released pollution to air versus water. On stratifying by type of industrial activity, statistically significant associations were also observed among women residing in the vicinity of galvanizing installations (1.58, 1.09-2.29) and surface-treatment installations using an electrolytic or chemical process (1.34, 1.10-1.62), which released pollution to air. There was an effect whereby risk increased with proximity to certain installations. The results suggest an association between risk of dying due to leukemia and proximity to Spanish metal industries. Copyright 2010 Elsevier Ltd. All rights reserved.
Smoke alarm installation and function in inner London council housing.
DiGuiseppi, C; Roberts, I; Speirs, N
1999-11-01
To determine the prevalence of and predictors for installed, functioning smoke alarms in council (public) housing in a low income, multi-ethnic urban area. Cross sectional study. 40 materially deprived electoral wards in two inner London boroughs. Occupants of 315 addresses randomly selected from council housing lists, with 75% response rate. Installation and function of smoke alarms based on inspection and testing. 39% (95% confidence interval (CI) 33% to 46%) of council tenants owned a smoke alarm, 31% (95% CI 25% to 38%) had an installed alarm (of which 54% were correctly installed), and 16% (95% CI 12% to 22%) had at least one installed, functioning alarm. Alarms most commonly failed because they lacked batteries (72%). In multivariate modelling, having an installed, functioning alarm was most strongly associated with living in a house versus a flat (apartment) (odds ratio (OR) 3.2, 95% CI 1.1 to 10.0), having two resident adults versus one (OR 2.8, 95% CI 1.2 to 6.5), and recognising stills from a Home Office television smoke alarm campaign (OR 2.4, 95% CI 1.1 to 5.5). Fires are a leading cause of child injury and death, particularly among those younger than 5 years of age and those in social classes IV and V. Smoke alarms are associated with a significantly reduced risk of death in residential fires, and are more protective in households with young children. Few council properties in a multi-ethnic, materially deprived urban area had any installed, functioning smoke alarms, despite a high risk of residential fires and fire related injuries in such areas. Effective methods to increase the prevalence of installed and functioning alarms must be identified.
Smoke alarm installation and function in inner London council housing
DiGuiseppi, C.; Roberts, I.; Speirs, N.
1999-01-01
AIM—To determine the prevalence of and predictors for installed, functioning smoke alarms in council (public) housing in a low income, multi-ethnic urban area. DESIGN—Cross sectional study. SETTING—40 materially deprived electoral wards in two inner London boroughs. PARTICIPANTS—Occupants of 315 addresses randomly selected from council housing lists, with 75% response rate. MAIN OUTCOME MEASURES—Installation and function of smoke alarms based on inspection and testing. RESULTS—39% (95% confidence interval (CI) 33% to 46%) of council tenants owned a smoke alarm, 31% (95% CI 25% to 38%) had an installed alarm (of which 54% were correctly installed), and 16% (95% CI 12% to 22%) had at least one installed, functioning alarm. Alarms most commonly failed because they lacked batteries (72%). In multivariate modelling, having an installed, functioning alarm was most strongly associated with living in a house versus a flat (apartment) (odds ratio (OR) 3.2, 95% CI 1.1 to 10.0), having two resident adults versus one (OR 2.8, 95% CI 1.2 to 6.5), and recognising stills from a Home Office television smoke alarm campaign (OR 2.4, 95% CI 1.1 to 5.5). CONCLUSIONS—Fires are a leading cause of child injury and death, particularly among those younger than 5 years of age and those in social classes IV and V. Smoke alarms are associated with a significantly reduced risk of death in residential fires, and are more protective in households with young children. Few council properties in a multi-ethnic, materially deprived urban area had any installed, functioning smoke alarms, despite a high risk of residential fires and fire related injuries in such areas. Effective methods to increase the prevalence of installed and functioning alarms must be identified. PMID:10519711
2012-01-01
Background This study assessed the feasibility and acceptability of utilizing insecticide-treated plastic sheeting (ITPS) as a malaria control intervention in Papua New Guinea (PNG). Methods ZeroVector® ITPS was installed in 40 homes across four study sites representing a cross section of malaria transmission risk and housing style. Structured questionnaires were completed at the time of ITPS installation (n=40) and at four weeks post installation (n=40) with the household head. Similarly, group interviews with the male and/or female household heads were completed at installation (n=5) and four-week follow-up (n=4). Results ZeroVector® ITPS was successfully installed in a range of homes employing traditional and/or modern building materials in PNG. The ITPS installations remained intact over the course of the four-week trial period and were highly acceptable to both male and female household heads. No dissatisfaction with the ITPS product was reported at four-week follow-up; however, the installation process was time consuming, participants reported a reduction in mosquito net use following ITPS installation and many participants expressed concern about the longevity of ITPS over the longer term. Conclusion ZeroVector® ITPS installation is feasible and highly acceptable in a diverse range of PNG contexts and is likely to be favourably received as a vector control intervention if accessible en masse. A longer-term evaluation is required before firm policy or public health decisions can be made regarding the potential application of ITPS in the national malaria control programme. The positive study findings suggest a longer-term evaluation of this promising malaria control intervention warrants consideration. PMID:23046535
NASA Astrophysics Data System (ADS)
Arias, E. Y.; Beaudoin, B. C.; Barstow, N.; Slad, G.
2010-12-01
IRIS PASSCAL supported a NSF-funded project to collect an open community dataset from a portable seismograph deployment following the magnitude 8.8 earthquake that occurred off the coast of Chile on February 27, 2010 (an experiment of the Rapid Array Mobilization Program - RAMP). In part, due to logistical constraints, the broadband sensors (Guralp CMG3T) for this deployment were buried directly in soil. Direct burial refers to installation of a broadband sensor in a small hand-dug hole, encased in plastic bags, and ideally backfilled with well tamped and dampened sand. Field conditions did not provide ideal installations in all cases. Because of the variability in actual installation practices, the Chile RAMP data provide an opportunity to examine the impact of several factors on the direct burial data quality. Using McNamara and Boaz (2005) PQLX statistical analysis software, which calculates the power spectral density (PSD) and plots the probability density function (PDF)(McNamara and Buland, 2004), we characterize the background seismic noise levels and signal quality for 58 directly buried installations at the Chile RAMP. Data return and data quality during the deployment (April -September 2010) will be evaluated considering a variety of parameters including installation technique, site characteristics, and equipment performance. Preliminary results using data from two service runs (April - June), suggest variation in the data quality and recovery due to slightly different installation practices and/or possibly environmental factors. We seek to evaluate and characterize parameters that affect the resulting data recovery and their quality; this study is an important test case for future PASSCAL and RAMP installations. If possible we would like to compare data from other local networks to identify distinctive characteristics from different installation set-ups.
Pulford, Justin; Tandrapah, Anthony; Atkinson, Jo-An; Kaupa, Brown; Russell, Tanya; Hetzel, Manuel W
2012-10-09
This study assessed the feasibility and acceptability of utilizing insecticide-treated plastic sheeting (ITPS) as a malaria control intervention in Papua New Guinea (PNG). ZeroVector® ITPS was installed in 40 homes across four study sites representing a cross section of malaria transmission risk and housing style. Structured questionnaires were completed at the time of ITPS installation (n=40) and at four weeks post installation (n=40) with the household head. Similarly, group interviews with the male and/or female household heads were completed at installation (n=5) and four-week follow-up (n=4). ZeroVector® ITPS was successfully installed in a range of homes employing traditional and/or modern building materials in PNG. The ITPS installations remained intact over the course of the four-week trial period and were highly acceptable to both male and female household heads. No dissatisfaction with the ITPS product was reported at four-week follow-up; however, the installation process was time consuming, participants reported a reduction in mosquito net use following ITPS installation and many participants expressed concern about the longevity of ITPS over the longer term. ZeroVector® ITPS installation is feasible and highly acceptable in a diverse range of PNG contexts and is likely to be favourably received as a vector control intervention if accessible en masse. A longer-term evaluation is required before firm policy or public health decisions can be made regarding the potential application of ITPS in the national malaria control programme. The positive study findings suggest a longer-term evaluation of this promising malaria control intervention warrants consideration.
EPA RE-Powering Mapper Completed Installations
The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.
14 CFR 27.967 - Fuel tank installation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...
14 CFR 27.967 - Fuel tank installation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...
14 CFR 27.967 - Fuel tank installation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...
14 CFR 27.967 - Fuel tank installation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...
14 CFR 27.967 - Fuel tank installation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...
47 CFR 80.903 - Inspection of radiotelephone installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of radiotelephone installation. 80... Passenger Boats § 80.903 Inspection of radiotelephone installation. Every vessel subject to Part III of...
24 CFR 3286.505 - Minimum elements to be inspected.
Code of Federal Regulations, 2010 CFR
2010-04-01
... with respect to home design and construction; (b) Consideration of site-specific conditions; (c) Site... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered States § 3286.505 Minimum elements to be inspected. The installation of every manufactured home...
24 CFR 3280.709 - Installation of appliances.
Code of Federal Regulations, 2011 CFR
2011-04-01
... systems designed only to accept external cooling (i.e., self contained air conditioning systems, etc.) (7) The installation of a self contained air conditioner comfort cooling appliance shall meet the... fireplace or fireplace stove, air intake assembly, hearth extension and the chimney shall be installed in...
Pilot installation of a bridge scour monitoring site at FM 1157 Mustang Creek
DOT National Transportation Integrated Search
1999-12-01
A pilot installation was implemented at the Mustang Creek bridge crossing on FM 1157 in the Yoakum District, Jackson County, Texas. This pilot installation was developed in two phases. Phase 1 used a rather limited datalogger that lacked the ability ...
49 CFR 192.359 - Customer meter installations: Operating pressure.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...
46 CFR 77.03-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 96.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or... be in accordance with the requirements of subchapter J (Electrical Engineering) of this chapter...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
46 CFR 77.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior... accordance with the requirements of subchapter J (Electrical Engineering) of this chapter. Systems of this...
40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...
14 CFR 35.3 - Instructions for propeller installation and operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Instructions for propeller installation and... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS General § 35.3 Instructions for propeller.... Those approved instructions must contain: (a) Instructions for installing the propeller, which: (1...
14 CFR 35.3 - Instructions for propeller installation and operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Instructions for propeller installation and... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS General § 35.3 Instructions for propeller.... Those approved instructions must contain: (a) Instructions for installing the propeller, which: (1...
14 CFR 35.3 - Instructions for propeller installation and operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Instructions for propeller installation and... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS General § 35.3 Instructions for propeller.... Those approved instructions must contain: (a) Instructions for installing the propeller, which: (1...
14 CFR 35.3 - Instructions for propeller installation and operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Instructions for propeller installation and... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS General § 35.3 Instructions for propeller.... Those approved instructions must contain: (a) Instructions for installing the propeller, which: (1...
14 CFR 35.3 - Instructions for propeller installation and operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Instructions for propeller installation and... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: PROPELLERS General § 35.3 Instructions for propeller.... Those approved instructions must contain: (a) Instructions for installing the propeller, which: (1...
48 CFR 1852.245-71 - Installation-accountable Government property.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Government property. 1852.245-71 Section 1852.245-71 Federal Acquisition Regulations System NATIONAL... Provisions and Clauses 1852.245-71 Installation-accountable Government property. As prescribed in 1845.107-70(b)(1), insert the following clause: Installation-Accountable Government Property (JAN 2011) (a) The...
48 CFR 1852.245-71 - Installation-accountable Government property.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Government property. 1852.245-71 Section 1852.245-71 Federal Acquisition Regulations System NATIONAL... Provisions and Clauses 1852.245-71 Installation-accountable Government property. As prescribed in 1845.107-70(b)(1), insert the following clause: Installation-Accountable Government Property (JAN 2011) (a) The...
40 CFR 90.128 - Installation instructions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... an engine will be installed in its certified configuration. In particular, describe the steps needed... (CONTINUED) CONTROL OF EMISSIONS FROM NONROAD SPARK-IGNITION ENGINES AT OR BELOW 19 KILOWATTS Emission Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for...
40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...
40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...
40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...
40 CFR 1033.130 - Instructions for engine remanufacturing or engine installation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Instructions for engine remanufacturing or engine installation. 1033.130 Section 1033.130 Protection of Environment ENVIRONMENTAL... and Related Requirements § 1033.130 Instructions for engine remanufacturing or engine installation. (a...
42 CFR 84.133 - Harnesses; installation and construction; minimum requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false Harnesses; installation and construction; minimum... SERVICES OCCUPATIONAL SAFETY AND HEALTH RESEARCH AND RELATED ACTIVITIES APPROVAL OF RESPIRATORY PROTECTIVE DEVICES Supplied-Air Respirators § 84.133 Harnesses; installation and construction; minimum requirements...
32 CFR 809a.8 - Installation policies and laws.
Code of Federal Regulations, 2012 CFR
2012-07-01
... INSTALLATION ENTRY POLICY, CIVIL DISTURBANCE INTERVENTION AND DISASTER ASSISTANCE Civil Disturbance Intervention and Disaster Assistance § 809a.8 Installation policies and laws. This subpart contains policies on... responsibility of State and local authorities. It is well-established U.S. Government policy that intervention...
32 CFR 809a.8 - Installation policies and laws.
Code of Federal Regulations, 2013 CFR
2013-07-01
... INSTALLATION ENTRY POLICY, CIVIL DISTURBANCE INTERVENTION AND DISASTER ASSISTANCE Civil Disturbance Intervention and Disaster Assistance § 809a.8 Installation policies and laws. This subpart contains policies on... responsibility of State and local authorities. It is well-established U.S. Government policy that intervention...
32 CFR 809a.8 - Installation policies and laws.
Code of Federal Regulations, 2011 CFR
2011-07-01
... INSTALLATION ENTRY POLICY, CIVIL DISTURBANCE INTERVENTION AND DISASTER ASSISTANCE Civil Disturbance Intervention and Disaster Assistance § 809a.8 Installation policies and laws. This subpart contains policies on... responsibility of State and local authorities. It is well-established U.S. Government policy that intervention...
32 CFR 809a.8 - Installation policies and laws.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INSTALLATION ENTRY POLICY, CIVIL DISTURBANCE INTERVENTION AND DISASTER ASSISTANCE Civil Disturbance Intervention and Disaster Assistance § 809a.8 Installation policies and laws. This subpart contains policies on... responsibility of State and local authorities. It is well-established U.S. Government policy that intervention...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2011 CFR
2011-07-01
... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...
40 CFR 60.3038 - What continuous emission monitoring systems must I install?
Code of Federal Regulations, 2010 CFR
2010-07-01
... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...
78 FR 23685 - Airworthiness Directives; The Boeing Company
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...
14 CFR 29.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...
14 CFR 29.1309 - Equipment, systems, and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...
Conducting Slug Tests in Mini-Piezometers.
Fritz, Bradley G; Mackley, Rob D; Arntzen, Evan V
2016-03-01
Slug tests performed using mini-piezometers with internal diameters as small as 0.43 cm can provide a cost effective tool for hydraulic characterization. We evaluated the hydraulic properties of the apparatus in a laboratory environment and compared those results with field tests of mini-piezometers installed into locations with varying hydraulic properties. Based on our evaluation, slug tests conducted in mini-piezometers using the fabrication and installation approach described here are effective within formations where the hydraulic conductivity is less than 1 × 10(-3) cm/s. While these constraints limit the potential application of this method, the benefits to this approach are that the installation, measurement, and analysis is cost effective, and the installation can be completed in areas where other (larger diameter) methods might not be possible. Additionally, this methodology could be applied to existing mini-piezometers previously installed for other purposes. Such analysis of existing installations could be beneficial in interpreting previously collected data (e.g., water-quality data or hydraulic head data). © 2015, National Ground Water Association.
Downhole geophysical observatories: best installation practices and a case history from Turkey
NASA Astrophysics Data System (ADS)
Prevedel, Bernhard; Bulut, Fatih; Bohnhoff, Marco; Raub, Christina; Kartal, Recai F.; Alver, Fatih; Malin, Peter E.
2015-09-01
Downhole sensors of different types and in various environments provide substantial benefit to signal quality. They also add the depth dimension to measurements performed at the Earths' surface. Sensor types that particularly benefit from downhole installation due to the absence of near-surface noise include piezometers, seismometers, strainmeters, thermometers, and tiltmeters. Likewise, geochemical and environmental measurements in a borehole help eliminate near-surface weathering and cultural effects. Installations from a few hundred meter deep to a few kilometer deep dramatically reduce surface noise levels—the latter noticeably also reduces the hypocentral distance for shallow microearthquakes. The laying out of a borehole network is always a compromise of local boundary conditions and the involved drilling costs. The installation depth and procedure for a long-term downhole observatory can range from time limited installations, with a retrieval option, to permanently cemented sensors. Permanently cemented sensors have proven to be long-term stable with non-deteriorating coupling and borehole integrity. However, each type needs to be carefully selected and planned according to the research aims. A convenient case study is provided by a new installation of downhole seismometers along the shoreline of the eastern Marmara Sea in Turkey. These stations are being integrated into the regional net for monitoring the North Anatolian Fault Zone. Here we discuss its design, installation, and first results. We conclude that, despite the logistical challenges and installation costs, the superior quality of downhole data puts this technique at the forefront of applied and fundamental research.
Project SAGE: solar assisted gas energy. Final report and executive summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less
47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
Understanding refractory failures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bases, G.J.
2006-01-15
Compared to most pieces of a power plant, refractory costs very little to install. Yet, if improperly manufactured, specified, stored, mixed installed, cured, or dried, refractory may cause problems that can significantly decrease a plant's operating efficiency and flexibility. Like Rodney Dangerfield, refractory design and installation deserve more respect. 4 photos.
46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
46 CFR 95.16-60 - System piping installation testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... VESSELS FIRE PROTECTION EQUIPMENT Fixed Clean Agent Gas Extinguishing Systems, Details § 95.16-60 System piping installation testing. (a) Halocarbon systems. A pressure test using the extinguishing agent, air... installation and before extinguishing agent cylinders are connected. (1) Except as otherwise specified in this...
Installation and performance evaluation of the wabocrete FMV joint system for bridge decks.
DOT National Transportation Integrated Search
1990-01-01
A Wabocrete FMV bridge deck expansion joint system was installed on the Alternate Rte. 58 bridge over the Clinch River in November 1986. The bridge was placed in service in mid-1987. The report concerns an installation and performance evaluation of t...
78 FR 53702 - User Fees for Processing Installment Agreements and Offers in Compromise
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... User Fees for Processing Installment Agreements and Offers in Compromise AGENCY: Internal Revenue... document contains proposed amendments to the regulations that provide user fees for installment agreements... agencies to prescribe regulations that establish charges for services provided by the agencies (user fees...
7 CFR 764.231 - Conservation loan uses.
Code of Federal Regulations, 2012 CFR
2012-01-01
... not limited to: (1) The installation of conservation structures to address soil, water, and related... shelter belt purposes; (3) The installation of water conservation measures; (4) The installation of waste... 7 Agriculture 7 2012-01-01 2012-01-01 false Conservation loan uses. 764.231 Section 764.231...
Code of Federal Regulations, 2014 CFR
2014-10-01
... interference to radio astronomy, research and receiving installations. 73.6027 Section 73.6027... radio astronomy, research and receiving installations. An applicant for digital operation of an existing... astronomy, research and receiving installations. [69 FR 69331, Nov. 29, 2004] ...
Code of Federal Regulations, 2012 CFR
2012-10-01
... interference to radio astronomy, research and receiving installations. 73.6027 Section 73.6027... radio astronomy, research and receiving installations. An applicant for digital operation of an existing... astronomy, research and receiving installations. [69 FR 69331, Nov. 29, 2004] ...
Code of Federal Regulations, 2010 CFR
2010-10-01
... interference to radio astronomy, research and receiving installations. 73.6027 Section 73.6027... radio astronomy, research and receiving installations. An applicant for digital operation of an existing... astronomy, research and receiving installations. [69 FR 69331, Nov. 29, 2004] ...
Code of Federal Regulations, 2011 CFR
2011-10-01
... interference to radio astronomy, research and receiving installations. 73.6027 Section 73.6027... radio astronomy, research and receiving installations. An applicant for digital operation of an existing... astronomy, research and receiving installations. [69 FR 69331, Nov. 29, 2004] ...
Code of Federal Regulations, 2013 CFR
2013-10-01
... interference to radio astronomy, research and receiving installations. 73.6027 Section 73.6027... radio astronomy, research and receiving installations. An applicant for digital operation of an existing... astronomy, research and receiving installations. [69 FR 69331, Nov. 29, 2004] ...
49 CFR 192.357 - Customer meters and regulators: Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...
46 CFR 96.03-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 96.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of... (Marine Engineering) of this chapter. Systems of this type include the following: Steering Systems. Bilge...
46 CFR 195.03-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 195.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of... (Marine Engineering) of this chapter. Systems of this type include the following: Steering Systems. Bilge...
This tutorial provides instructions for accessing, retrieving, and downloading the following software to install on a host computer in support of Quantitative Microbial Risk Assessment (QMRA) modeling: • QMRA Installation • SDMProjectBuilder (which includes the Microbial ...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2011-10-01 2011-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2012-10-01 2012-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2014-10-01 2014-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
46 CFR 167.40-1 - Electrical installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... (Electrical Engineering) of this chapter. (3) Institute of Electrical and Electronic Engineers, Inc. (IEEE... 46 Shipping 7 2013-10-01 2013-10-01 false Electrical installations. 167.40-1 Section 167.40-1... SHIPS Certain Equipment Requirements § 167.40-1 Electrical installations. (a) Except as otherwise...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Systems; (3) Electrical system information including a plan of each platform deck, outlining all hazardous... Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum...
32 CFR 50.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... personal commercial solicitation on DoD installations consistent with the policy set forth in this part. (2) Maintain and make available to installation commanders and appropriate Federal personnel the current master... installation. (3) Develop and maintain a list of all State Insurance Commissioners' points of contact for DoD...
75 FR 44067 - Conservation Reserve Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
... land, and installation of wind turbines. Therefore, Sec. 1410.63 is amended to implement the specific... emergencies, but was not specified as a permitted use in the CFR. Wind turbine installation provisions are... requires a payment reduction for the permissive use for wind turbine installation. All of the permissive...