General aviation avionics equipment maintenance
NASA Technical Reports Server (NTRS)
Parker, C. D.; Tommerdahl, J. B.
1978-01-01
Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
32 CFR 634.4 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.
1982-06-01
The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less
Vibrational impacts of hush house operation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witten, A.J.
1988-01-01
United States Air Force (USAF) facilities are required to test turboprop and turbojet engines before or after maintenance or repair and prior to installation on aircraft to ensure that no problems were introduced or remain uncorrected. This requirement prevents the installation of engines in aircraft which require further maintenance. There are a number of facilities in use by USAF for conducting engine diagnostic tests. The most modern of these facilities is the hush house which is a hangar-like structure designed to isolate the noise associated with extended engine operations from the surrounding environment. One type of hush house, the T-10,more » is of particular concern because of vibrational impacts to surrounding structures induced by subaudible sound (infrasound) emitted during operation. While these facilities fulfill the design requirement of reducing audible noise, serious siting problems have been reported at several installations because of infrasound-induced vibrations. The worst of these include the abandonment of an avionics laboratory because induced vibrations interfered with this facilities function and structural damage to a concrete block maintenance facility. This paper describes a predictive method for assessing vibration-driven structural impacts. 9 refs., 2 figs.« less
Prototype solar heating and combined heating and cooling systems
NASA Technical Reports Server (NTRS)
1976-01-01
Eight prototype solar heating and combined heating and cooling systems are considered. This effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.
Prototype solar heating and combined heating and cooling systems
NASA Technical Reports Server (NTRS)
1977-01-01
Eight prototype solar heating and combined heating and cooling systems are being developed. The effort includes development, manufacture, test, installation, maintenance, problem resolution, and performance evaluation.
Prototype solar-heated hot water systems and double-walled heat exchangers
NASA Technical Reports Server (NTRS)
1978-01-01
Development progress made on two solar-heated hot water systems and two heat exchangers is reported. The development, manufacture, installation, maintenance, problem resolution, and system evaluation are described.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
Eight prototype systems were developed. The systems are 3, 25, and 75-ton size units. The manufacture, test, installation, maintenance, problem resolution, and performance evaluation of the systems is described. Size activities for the various systems are included.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1979-01-01
A combination of monthly progress reports are presented. It contains a summary of activities and progress made from November 1, 1978, to February 28, 1979. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation.
NASA Technical Reports Server (NTRS)
1980-01-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
NASA Astrophysics Data System (ADS)
1980-09-01
Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.
NASA Astrophysics Data System (ADS)
Dovbysh, V. O.; Burakova, L. N.; Burakova, A. D.
2018-01-01
The article raises the problem of the maintenance of the urban area in winter, namely, the problem of disposal of snow masses from the urban area. The article describes the main disadvantages of the existing snow-melting systems for the utilization of city snow mass and are encouraged to develop an installation for melting of snow, functioning at the expense of power consumption. The developed installation allows to reduce the noise level during its operation, to exclude the influence of exhaust gases on the environment, therefore, to improve the environmental safety of the urban infrastructure.
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports on the development of eight prototype solar heating and cooling systems is presented. The effort calls for the development, manufacture, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3, 25, and 75 ton size units.
Prototype solar heating and cooling systems
NASA Technical Reports Server (NTRS)
1978-01-01
A collection of monthly status reports are given on the development of eight prototype solar heating and cooling systems. This effort calls for the development, manufacturing, test, system installation, maintenance, problem resolution, and performance evaluation. The systems are 3-, 25-, and 75-ton size units.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A collection of quarterly and monthly reports from Elcam, Inc., covering progress made from January 1, 1978, through September 30, 1978, is presented. Elcam, is developing two solar-heated hot water prototype systems and two heat exchangers. This effort consists of development, manufacture, installation, maintenance, problem resolution, and system evaluation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sliwinski, B.J.; Kermath, D.; Kemme, M.R.
There is a growing body of information related to facility indoor air quality (IAQ) and its affect on the health and productivity of building occupants. Indoor air pollution can increase employee absenteeism and reduce productivity. Poor IAQ may be a result of poor building or ventilation design, improper maintenance, or inappropriate energy conservation strategies. To help ensure the health, welfare, and productivity of Army personnel and the performance of Army facilities, installation operations and maintenance (O and M) personnel need access to relevant and useful information about IAQ issues. This report includes background information for O and M managers andmore » staff, an installation-level IAQ management plan, and practical O and M procedures for correcting the problems that most commonly lead to IAQ-related complaints.« less
Cables and connectors: A compilation
NASA Technical Reports Server (NTRS)
1974-01-01
A compilation is presented that reflects the uses, adaptation, and maintenance plus service, that are innovations derived from problem solutions in the space R and D programs, both in house and by NASA and AEC contractors. Data cover: (1) technology revelant to the employment of flat conductor cables and their adaptation to and within conventional systems, (2) connectors and various adaptations, and (3) maintenance and service technology, and shop hints useful in the installation and care of cables and connectors.
Maintenance of submersible pumps in the septic tanks: ergonomic and biological risks to the worker.
Mariño, Suzi; Figueiredo, Alex
2012-01-01
In this study was observed the maintenance task of submersible pumps septic tanks installed in industrial bathrooms. This maintenance activity operators are exposed to various biological and ergonomic risks. This type of activity requires its great physical performers who are also subject to contact with human waste in the form of liquids, gases and solids. Besides the problems mentioned, are still exposed to high temperatures that can cause diseases such as hyperthermia or heatstroke. These aspects were observed using the ergonomic assessment methodology in order to suggest improvements that are reflected in productivity and employee satisfaction.
The Architect's Guide to Mechanical Systems.
ERIC Educational Resources Information Center
Andrews, F. T.
The principles and problems of designing new building mechanical systems are discussed in this reference source in the light of data on the functions and operation of mechanical systems. As a practical guide to understanding mechanical systems it describes system types, functions, space requirements, weights, installation, maintenance and…
NASA Technical Reports Server (NTRS)
1985-01-01
The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.
Solar heating system installed at Telex Communications, Inc., Blue Earth, Minnesota
NASA Technical Reports Server (NTRS)
1977-01-01
The solar heating system for space heating a 97,000 square foot building which houses administrative offices, assembly areas, and warehouse space is summarized. Information on system description, test data, major problems and resolutions, performance, operation and maintenance manual, manufacturer's literature, and as-built drawings is presented.
El Toro Library Solar Heating and Cooling Demonstration Project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.
NASA Technical Reports Server (NTRS)
1978-01-01
The plan schedule and status of multiple objectives to be achieved in the development, manufacture, installation, and maintenance of two solar heated hot water prototype systems and two heat exchangers are reported. A computer program developed to resolve problems and evaluate system performance is described.
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...
DOT National Transportation Integrated Search
1978-01-01
Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
48 CFR 242.202 - Assignment of contract administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...
40 CFR 1065.303 - Summary of required calibration and verifications.
Code of Federal Regulations, 2012 CFR
2012-07-01
... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...
40 CFR 1065.303 - Summary of required calibration and verifications.
Code of Federal Regulations, 2013 CFR
2013-07-01
... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...
30 CFR 57.9307 - Design, installation, and maintenance of railroads.
Code of Federal Regulations, 2010 CFR
2010-07-01
... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to provide...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
46 CFR 120.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...
46 CFR 120.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...
Installation, care, and maintenance of wood shake and shingle siding
Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt
2011-01-01
This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…
The influence of maintenance quality of hemodialysis machines on hemodialysis efficiency.
Azar, Ahmad Taher
2009-01-01
Several studies suggest that there is a correlation between dose of dialysis and machine maintenance. However, in spite of the current practice, there are conflicting reports regarding the relationship between dose of dialysis or patient outcome, and machine maintenance. In order to evaluate the impact of hemodialysis machine maintenance on dialysis adequacy Kt/V and session performance, data were processed on 134 patients on 3-times-per-week dialysis regimens by dividing the patients into four groups and also dividing the hemodialysis machines into four groups according to their year of installation. The equilibrated dialysis dose eq Kt/V, urea reduction ratio (URR) and the overall equipment effectiveness (OEE) were calculated in each group to show the effect hemodialysis machine efficiency on the overall session performance. The average working time per machine per month was 270 hours. The cumulative number of hours according to the year of installation was: 26,122 hours for machines installed in 1998; 21,596 hours for machines installed in 1999, 8362 hours for those installed in 2003 and 2486 hours for those installed in 2005. The mean time between failures (MTBF) was 1.8, 2.1, 4.2 and 6 months between failures for machines installed in 1999, 1998, 2003 and 2005, respectively. Statistical analysis demonstrated that the dialysis dose eq Kt/V and URR were increased as the overall equipment effectiveness (OEE) increases with regular maintenance procedures. Maintenance has become one of the most expedient approaches to guarantee high machine dependability. The efficiency of dialysis machine is relevant in assuring a proper dialysis adequacy.
40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...
30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...
Installation, care, and maintenance of wood shake and shingle roofs
Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt
2011-01-01
This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...
Acoustic and other factors relating to the use of sound field systems in classrooms
NASA Astrophysics Data System (ADS)
Carey, Anne; Shield, Bridget; Dockrell, Julie; Rigby, Kate
2005-04-01
A study has been made of thirty-five primary school classrooms which have Sound Field Systems (SFS) installed. Acoustic surveys of the classrooms have been undertaken and detailed observations made of the physical characteristics of each room such as its construction and design, plus any acoustic treatment. The positioning and type, e.g., column or separate speakers, of SFS installed were also noted. Details of the procedures for purchasing, installing, and maintaining the SFS were obtained where possible, together with information concerning training of teachers in their use. Results from these surveys suggest that in many cases SFS are installed in rooms where their performance may be compromised because of inadequate acoustic conditions. Additionally problems may arise due to inappropriate installation, choice of system, poor maintenance, or lack of training. The effectiveness of acoustic treatment such as absorption applied to ceilings and walls has also been investigated in a range of classrooms and its impact on the use of SFS considered.
Code of Federal Regulations, 2010 CFR
2010-10-01
... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...
[Air quality control systems: heating, ventilating, and air conditioning (HVAC)].
Bellucci Sessa, R; Riccio, G
2004-01-01
After a brief illustration of the principal layout schemes of Heating, Ventilating, and Air Conditioning (HVAC), the first part of this paper summarizes the standards, both voluntary and compulsory, regulating HVAC facilities design and installation with regard to the question of Indoor Air Quality (IAQ). The paper then examines the problem of ventilation systems maintenance and the essential hygienistic requirements in whose absence HVAC facilities may become a risk factor for people working or living in the building. Lastly, the paper deals with HVAC design strategies and methods, which aim not only to satisfy comfort and air quality requirements, but also to ensure easy and effective maintenance procedures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, E.; Dongarra, J.
1989-05-01
This working note describes how to install and test the initial release of LAPACK. LAPACK is intended to provide a uniform set of subroutines to solve the most common linear algebra problems and to run efficiently on a wide range of architectures. The routines presented at this time are intended not for general distribution, but only for initial testing. We expect the testing to reveal weaknesses in the design, and we plan to modify routines to correct any deficiencies. The instructions for installing, testing, and timing are designed for a person whose responsibility is the maintenance of a mathematical softwaremore » library. This paper provides instructions for Unix users installing a tar tape, and contains instructions for non-Unix users. We assume the installer has experience in compiling and running Fortran programs and in creating object libraries. The installation process involves reading a tape, creating a library from the Fortran source, running the tests, and sending the results to Argonne. 6 refs.« less
Pacer Comet 4: Automated Jet Engine Testing of a TF33-P100 Pratt & Whitney Engine
NASA Astrophysics Data System (ADS)
Mason, Rex Bolding
Pacer Comet 4 found its life out of necessity to replace an obsolescent Pacer Comet 3 engine test system at Tinker AFB in Oklahoma City, OK. Pacer Comet 3 (PC3) was created and installed in the early 1980's to test jet engines from a wide range of planes. PC3 had several problems from a maintenance standpoint: contractors designed and installed the system but the contract did not include the OEM data package. Without drawings or design knowledge, fixing the smallest of problems could turn into a multi-day project. In addition to high cost, as the OEM companies of proprietary parts went out of business, it became impossible to find a replacement for a failed part. These issues set the framework for the Pacer Comet 4 (PC4) system. PC4 was created as an organic AF and Department of Defense collaboration to fix the issues with PC3. PC4 provides the customer with a complete data package including multiple drawing sets and data sheets for all parts used, as well as design files for all PCBs created in house. PC4 has a standard to use commercially available off the shelf parts (COTS). The reason for this is sustainability in maintenance. If a part is to fail, it should be able to be purchased from any manufacturer that meets the specs of the original product. No proprietary parts are used, except as directed by the engine's OEM. This thesis will focus on the design and installation of the on-frame data acquisition PC4 system for the Pratt & Whitney TF33-P100A-QEC engine that is currently in use on the E3 Sentry. This thesis will show efficiency improvements for maintenance sustainability (70% cabling reduction) as well as discuss performance improvements in both test and production environments.
One Solution to the Arsenic Problem: A Return to Surface (Improved Dug) Wells
Joya, Sakila Afroz; Mostofa, Golam; Yousuf, Jabed; Islam, Ariful; Elahi, Altab; Mahiuddin, Golam; Rahman, Mahmuder; Quamruzzaman, Quazi
2006-01-01
Arsenic contamination in drinking-water in Bangladesh is a major catastrophe, the consequences of which exceed most other man-made disasters. The national policy encourages the use of surface water as much as possible without encountering the problems of sanitation that led to the use of groundwater in the first place. This paper describes the success of the Dhaka Community Hospital (DCH) team and the procedure in implementing sanitary, arsenic-free, dugwells. The capital cost for running water is US$ 5–6 per person. Sixty-six sanitary dugwells were installed in phases between 2000 and 2004 in Pabna district of Bangladesh where there was a great need of safe water because, in some villages, 90% of tubewells were highly contaminated with arsenic. In total, 1,549 families now have access to safe arsenic-free dugwell water. Some of them have a water-pipe up to their kitchen. All of these were implemented with active participation of community members. They also pay for water-use and are themselves responsible for the maintenance and water quality. The DCH helped the community with installation and maintenance protocol and also with monitoring water quality. The bacteria levels are low but not always zero, and studies are in progress to reduce bacteria by chlorination. PMID:17366778
Rapid Transit Subways - Guidelines for Engineering New Installations for Reduced Maintenance
DOT National Transportation Integrated Search
1978-01-01
Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...
30 CFR 56.9307 - Design, installation, and maintenance of railroads.
Code of Federal Regulations, 2010 CFR
2010-07-01
... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads. Roadbeds...
10 CFR 35.605 - Installation, maintenance, adjustment, and repair.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...
10 CFR 35.605 - Installation, maintenance, adjustment, and repair.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...
10 CFR 35.605 - Installation, maintenance, adjustment, and repair.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...
10 CFR 35.605 - Installation, maintenance, adjustment, and repair.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...
10 CFR 35.605 - Installation, maintenance, adjustment, and repair.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...
ERIC Educational Resources Information Center
COMSTOCK, GEORGE; MACCOBY, NATHAN
THE PEACE CORPS (ETV) PROJECT IN COLOMBIA ENCOUNTERED PROBLEMS IN TV PRODUCTION, INSTALLATION, MAINTENANCE, UTILIZATION OF TELEVISED INSTRUCTION, AND LEADERSHIP. BY JUNE OF THE FIRST SEMESTER TELEVISED ELEMENTARY INSTRUCTION INCLUDED ABOUT 390 SCHOOLS, 2,000 TEACHERS, AND 60,000 PUIPLS. EXTENSIVE RESEARCH INTENDED TO PROVIDE A BASIS FOR CORRECTIVE…
2016-10-14
not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians
NASA Technical Reports Server (NTRS)
Hersey, Mayo D
1923-01-01
This report is intended as a technical introduction to the series of reports on aeronautic instruments. It presents a discussion of those subjects which are common to all instruments. First, a general classification is given, embracing all types of instruments used in aeronautics. Finally, a classification is given of the various problems confronted by the instrument expert and investigator. In this way the following groups of problems are brought up for consideration: problems of mechanical design, human factor, manufacturing problems, supply and selection of instruments, problems concerning the technique of testing, problems of installation, problems concerning the use of instruments, problems of maintenance, and physical research problems. This enumeration of problems which are common to instruments in general serves to indicate the different points of view which should be kept in mind in approaching the study of any particular instrument.
DOT National Transportation Integrated Search
2005-03-01
This document provides guidance for the installation, inspection, maintenance, and repair of structural supports for highway signs, luminaires and traffic signals. The primary purpose is to provide owners with information that can assist them in mana...
-7162 Don assists with the installation and maintenance of the NWTC's field test turbines as well as with test article installations and testing in the Structural Testing Laboratory and both dynamometer facilities. He participates in the operation and maintenance of the field test sites and meteorological
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...
Leung, Y.-F.; Marion, J.
1999-01-01
The degradation of trail resources associated with expanding recreation and tourism visitation is a growing management problem in protected areas worldwide. In order to make judicious trail and visitor management decisions, protected area managers need objective and timely information on trail resource conditions. This paper introduces a trail survey method that efficiently characterizes the lineal extent of common trail problems. The method was applied to a large sample of trails within Great Smoky Mountains National Park, a highuse protected area in the USA. The Trail ProblemAssessment Method (TPAM) employs a continuous search for multiple indicators of predefined tread problems, yielding census data documenting the location, occurrence and extent of each problem. The present application employed 23 different indicators in three categories to gather inventory, resource condition, and design and maintenance data of each surveyed trail. Seventy-two backcountry hiking trails (528 km), or 35% of the Park's total trail length, were surveyed. Soil erosion and wet soil were found to be the two most common impacts on a lineal extent basis. Trails with serious tread problems were well distributed throughout the Park, although wet muddy treads tended to be concentrated in areas where horse use was high. The effectiveness of maintenance features installed to divert water from trail treads was also evaluated. Water bars were found to be more effective than drainage dips. The TPAM was able to provide Park managers with objective and quantitative information for use in trail planning, management and maintenance decisions, and is applicable to other protected areas elsewhere with different environmental and impact characteristics.
40 CFR 1065.303 - Summary of required calibration and verifications.
Code of Federal Regulations, 2014 CFR
2014-07-01
...: FID calibrationTHC FID optimization, and THC FID verification Calibrate all FID analyzers: upon initial installation and after major maintenance.Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon...
40 CFR 1065.303 - Summary of required calibration and verifications
Code of Federal Regulations, 2010 CFR
2010-07-01
.... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...
40 CFR 1065.303 - Summary of required calibration and verifications
Code of Federal Regulations, 2011 CFR
2011-07-01
.... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...
14 CFR 221.180 - Requirements for electronic filing of tariffs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...
14 CFR 221.180 - Requirements for electronic filing of tariffs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...
14 CFR 221.180 - Requirements for electronic filing of tariffs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...
14 CFR 221.180 - Requirements for electronic filing of tariffs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...
14 CFR 221.180 - Requirements for electronic filing of tariffs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...
40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...
GOES data-collection system instrumentation, installation, and maintenance manual
Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.
1986-01-01
The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)
CERN experience and strategy for the maintenance of cryogenic plants and distribution systems
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.
2015-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.
46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...
Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual
NASA Technical Reports Server (NTRS)
1977-01-01
The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.
Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.
ERIC Educational Resources Information Center
Marine Corps Inst., Washington, DC.
This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…
DOE/NREL supported wind energy activities in Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Drouilhet, S.
1997-12-01
This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less
32 CFR Appendix C to Subpart M of... - Authorized Activities for Maneuver Training Area Access
Code of Federal Regulations, 2010 CFR
2010-07-01
... commercial use (AR 405-80) Installation service and maintenance (AR 420-74, FL Reg 350-30) Non-DoD personnel...-1) Horseback riding on roads and vehicle tracks Walking, distance running Model airplane and rocket...) Installation service and maintenance (AR 420-74) Non-Commercial recreational use: Hunting, fishing and trapping...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? 63.2164 Section 63.2164 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...
Design and installation package for a solar powered pump
NASA Technical Reports Server (NTRS)
1978-01-01
The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.
2016-06-01
Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when
Unsurfaced Road Maintenance Management
DOT National Transportation Integrated Search
1992-12-01
This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...
Flat-plate solar collector - installation package
NASA Technical Reports Server (NTRS)
1978-01-01
Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.
48 CFR 217.171 - Multiyear contracts for services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agency may enter into multiyear contracts for supplies and services required for management, maintenance..., maintenance, and support of facilities and installations. (ii) Maintenance or modification of aircraft, ships... services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and...
Installation package for a solar heating system
NASA Technical Reports Server (NTRS)
1978-01-01
Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.
Understanding, Classifying, and Selecting Environmentally Acceptable Hydraulic Fluids
2016-08-01
installed in land facilities or off- road vehicles such as excavators, bulldozers, backhoes, etc.), while others are installed on floating plants...and oily bilge tanks for the collection and proper disposal of oil- contaminated bilge water • Performing routine maintenance , including regular...regulations. Maintenance of machinery systems containing EA hydraulic fluids must strictly follow the hydraulic fluid manufacturer’s recommendations
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...
Maintenance and Logistics Support for the International Monitoring System Network of the CTBTO
NASA Astrophysics Data System (ADS)
Haslinger, F.; Brely, N.; Akrawy, M.
2007-05-01
The global network of the International Monitoring System (IMS) of the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO), once completed, will consist of 321 monitoring facilities of four different technologies: hydroacoustic, seismic, infrasonic, and radionuclide. As of today, about 65% of the installations are completed and contribute data to the products issued by the International Data Centre (IDC) of the CTBTO. In order to accomplish the task to reliably collect evidence for any potential nuclear test explosion anywhere on the planet, all stations are required to perform to very high data availability requirements (at least 98% data availability over a 12-month period). To enable reaching this requirement, a three-layer concept has been developed to allow efficient support of the IMS stations: Operations, Maintenance and Logistics, and Engineering. Within this concept Maintenance and Logistics provide second level support of the stations, whereby problems arising at the station are assigned through the IMS ticket system to Maintenance if they cannot be resolved on the Operations level. Maintenance will then activate the required resources to appropriately address and ultimately resolve the problem. These resources may be equipment support contracts, other third party contracts, or the dispatch of a maintenance team. Engineering Support will be activated if the problem requires redesign of the station or after catastrophic failures when a total rebuild of a station may be necessary. In this model, Logistics Support is responsible for parts replenishment and support contract management. Logistics Support also collects and analyzes relevant failure mode and effect information, develops supportability models, and has the responsibility for document management, obsolescence, risk & quality, and configuration management, which are key elements for efficient station support. Maintenance Support in addition is responsible for maintenance strategies, for planning and oversight of the execution of preventive maintenance programs by the Station Operators, and for review of operational troubleshooting procedures used in first level support. Particular challenges for the efficient and successful Maintenance and Logistics Support of the IMS network lie in the specific political boundary conditions regulating its implementation, in the fact that all IMS facilities and their equipment are owned by the respective host countries, and in finding the appropriate balance between outsourcing services and retaining essential in-house expertise.
30 CFR 206.259 - Determination of washing allowances.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Allowable maintenance expenses include: Maintenance of the wash plant; maintenance of equipment; maintenance..., or a cost equal to the depreciable investment in the wash plant multiplied by the rate of return in... depreciable fixed assets (including costs of delivery and installation of capital equipment) which are an...
Operation and maintenance results from ISFOC CPV plants
NASA Astrophysics Data System (ADS)
Gil, Eduardo; Martinez, María; de la Rubia, Oscar
2017-09-01
The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.
Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.
ERIC Educational Resources Information Center
Seaman, George B., Sr.
This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…
Code of Federal Regulations, 2010 CFR
2010-10-01
... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...
Maintenance Resources by Building Use for U.S. Army Installations. Volume 2. Appendices A through H
1991-05-01
Installations, Volume II: Appendices A Through H RDTE dated 1980REIMB 1984 6 . AUTHOR(S) Edgar S. Neely and Robert D. Neathammer 7 . PERFORML’JG...Recurring Maintenance Factor 1.10 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0 .000 .000 .000 .000 .000 .050 .190 .240 .300 .280...Special Condition Multiplier 1.00 Annual Recurring Maintenance Factor .79 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0
Code of Federal Regulations, 2010 CFR
2010-01-01
... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...
Dry-running gas seals save $200,000/yr in retrofit hydrogen recycle compressor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pennacchi, R.P.; Germain, A.
1987-10-01
Texaco Chemical Company was using three drums of oil per day in the seal oil system of a hydrogen recycle compressor, resulting in maintenance and operational expenses of more than $160,000 per year. Running 24 hours/day, 365 days/yr, the 26-yr-old compressor is the heart of the benzene manufacturing process unit at the Port Arthur, Texas plant. In the event of an unscheduled shutdown, the important aromatics unit process would halt and cause production losses of thousands of dollars per day. In addition, the close monitoring and minimization of leakage are essential since the gas consists of over 75% hydrogen, withmore » methane, ethane, propane, isobutane, N-butane and pentanes. Texaco Chemical Company decided that retrofit of the hydrogen recycle compressor should be undertaken if the system could be developed to sharply reduce operations and maintenance costs, and increase efficiencies. Texaco engineers selected a dry running-type gas sealing system developed for pipeline compressors in the United States, Canada, and overseas. A tandem-type sealing system was designed to meet specific needs of a hydrogen recycle compressor. The retrofit was scheduled for August 1986 to coincide with the plant's preventative maintenance program. The seal system installation required five days. The retrofit progressed according to schedule, with no problems experienced at the first and several startups since the initial installation. Oil consumption has been eliminated, along with seal support and parasitic energy requirements. With the savings in seal oil, energy, operations and maintenance, payback period for the retrofit sealing system was just over six months. Savings are expected to continue at an annual rate of over $200,000.« less
1984-07-01
was removed from the vessel and transported to Durban. The problem was apparently caused by a small piece of scrap metal inside the unit which caused...several wires to short circuit. How the scrap metal entered the CRT remains a mystery. The equipment may have been shipped from the factory with the... metal inside or the metal may have been inadvertently left within the CRT during installation aboard the ship or it may have rolled/bounced from the
Solar heating and cooling system installed at RKL Controls Company, Lumberton, New Jersey
NASA Technical Reports Server (NTRS)
1981-01-01
The final results of the design and operation of a computer controlled solar heated and cooled 40,000 square foot manufacturing building, sales office, and computer control center/display room are summarized. The system description, test data, major problems and resolutions, performance, operation and maintenance manual, equipment manufacturers' literature, and as-built drawings are presented. The solar system is composed of 6,000 square feet of flat plate collectors, external above ground storage subsystem, controls, absorption chiller, heat recovery, and a cooling tower.
Galvanic Liquid Applied Coating System for Protection of Embedded Steel Surfaces from Corrosion
NASA Technical Reports Server (NTRS)
Curran, Joseph; MacDowell, Louis; Voska, N. (Technical Monitor)
2002-01-01
The corrosion of reinforcing steel in concrete is an insidious problem for the Kennedy Space Center, government agencies, and the general public. Existing corrosion protection systems on the market are costly, complex, and time-consuming to install, require continuous maintenance and monitoring, and require specialized skills for installation. NASA's galvanic liquid-applied coating offers companies the ability to conveniently protect embedded steel rebar surfaces from corrosion. Liquid-applied inorganic galvanic coating contains one ore more of the following metallic particles: magnesium, zinc, or indium and may contain moisture attracting compounds that facilitate the protection process. The coating is applied to the outer surface of reinforced concrete so that electrical current is established between metallic particles and surfaces of embedded steel rebar; and electric (ionic) current is responsible for providing the necessary cathodic protection for embedded rebar surfaces.
29 CFR 500.105 - DOT standards adopted by the Secretary.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Act directly concerned with the management, maintenance, operation, or driving of motor vehicles..., agents, drivers, representatives and employees directly concerned with the installation and maintenance...) Inspection and maintenance of motor vehicles (Source: 49 CFR 398.7). Every person shall systematically...
McCarney, Steve; Robertson, Joanie; Arnaud, Juliette; Lorenson, Kristina; Lloyd, John
2013-12-09
Large areas of many developing countries have no grid electricity. This is a serious challenge that threatens the continuity of the vaccine cold chain. The main alternatives to electrically powered refrigerators available for many years--kerosene- and gas-driven refrigerators--are plagued by problems with gas supply interruptions, low efficiency, poor temperature control, and frequent maintenance needs. There are currently no kerosene- or gas-driven refrigerators that qualify under the minimum standards established by the World Health Organization (WHO) Performance, Quality, and Safety (PQS) system. Solar refrigeration was a promising development in the early 1980s, providing an alternative to absorption technology to meet cold chain needs in remote areas. Devices generally had strong laboratory performance data; however, experience in the field over the years has been mixed. Traditional solar refrigerators relied on relatively expensive battery systems, which have demonstrated short lives compared to the refrigerator. There are now alternatives to the battery-based systems and a clear understanding that solar refrigerator systems need to be designed, installed, and maintained by technicians with the necessary knowledge and training. Thus, the technology is now poised to be the refrigeration method of choice for the cold chain in areas with no electricity or extremely unreliable electricity (less than 4h per average day) and sufficient sunlight. This paper highlights some lessons learned with solar-powered refrigeration, and discusses some critical factors for successful introduction of solar units into immunization programs in the future including: •Sustainable financing mechanisms and incentives for health workers and technicians are in place to support long-term maintenance, repair, and replacement parts. •System design is carried out by qualified solar refrigerator professionals taking into account the conditions at installation sites. •Installation and repair are conducted by well-trained technicians. •Temperature performance is continuously monitored and protocols are in place to act on data that indicate problems. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.
2016-10-04
analysis (due to site-level evaluations), but could be added in the future, include: wind turbines (the installations we visited were not interested due...procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is difficult to obtain. The DPW is often...understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The reliability of these generators is typically
Supplemental Analysis Survey of C&P Telephone Inside Wiring.
1986-10-01
telephone company facilities in 1984. In 1985, among other actions favorable to deregulation and detariffing of inside wiring, the FCC proposed to detariff ...installation of inside wiring, detariff the maintenance of all inside wiring, treat all inside wiring as customer premise equipment and pass ownership...85-148, 50 Fed. let. 13991 (April 9, 1985), pToposing to detariff the installation of simple inside wiring and also to detariff the maintenance of all
NASA Astrophysics Data System (ADS)
Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.
2017-12-01
CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.
New concept for a general purpose subsea installation system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Citi, G.; Cowen, S.; Radicioni, A.
1996-12-31
The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less
Lowe, Evan; Drouin, Nathalie; Venhovens, Paul J; Brooks, Johnell O
2014-10-01
Understanding unique perspectives from key stakeholder groups involved in the hand control (HC) industry, including driver rehabilitation specialists (DRSs) who train users how to use their HCs, dealers/installers, and users, may become increasingly important in the United States due to increases in elderly, diabetic, and wounded warrior amputee driving populations. In this exploratory study, phone interviews were conducted with 20 DRSs, 20 dealers/installers, and 20 users regarding their perspectives about HC training, maintenance and operation, and design improvements. Results revealed common views and differences in perspectives about whether HC users should receive training and for how long, when and how often users should receive maintenance on their HCs, and what DRSs, dealers/installers, and users would like to see in the future.
14 CFR 171.323 - Fabrication and installation requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...
14 CFR 171.323 - Fabrication and installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...
14 CFR 171.323 - Fabrication and installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...
14 CFR 171.323 - Fabrication and installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...
Installation package for a sunspot cascade solar water heating system
NASA Technical Reports Server (NTRS)
1980-01-01
Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...
Adaptation of a military FTS to civilian air toxics measurements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Engel, J.R.; Dorval, R.K.
1994-12-31
In many ways, the military problem of chemical agent detection is similar to the civilian problem of toxic and related air pollutants detection. A recent program to design a next generation Fourier transform spectrometer (FTS) based chemical agent detection system has been funded by the US Army. This program has resulted in an FTS system that has a number of characteristics that make it suitable for applications to the civilian measurement problem. Low power, low weight, and small size lead to low installation, operating and maintenance costs. Innovative use of diode lasers in place of HeNe reference sources leads tomore » long lifetimes and high reliability. Absolute scan position servos allow for highly efficient offset scanning. This paper will relate the performance of this system to present air monitoring requirements.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
.... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...
Installation package for Hyde Memorial Observatory, Lincoln, Nebraska
NASA Technical Reports Server (NTRS)
1978-01-01
Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.
DOT National Transportation Integrated Search
1982-01-01
The installation of a thin polymer concrete overlay on the Beulah Road bridge demonstrates that an overlay of low permeability and high skid resistance can be successfully installed by maintenance forces with a minimum of disruption to traffic, appro...
Installation package for the Solaron solar subsystem
NASA Technical Reports Server (NTRS)
1979-01-01
Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.
System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.
NASA Technical Reports Server (NTRS)
1979-01-01
A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.
7 CFR 654.30 - Responsibility for operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...
7 CFR 654.30 - Responsibility for operation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...
7 CFR 654.30 - Responsibility for operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...
7 CFR 654.30 - Responsibility for operation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...
7 CFR 654.30 - Responsibility for operation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-01-01
... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...
Void Fraction Instrument operation and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borgonovi, G.; Stokes, T.I.; Pearce, K.L.
This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.
The roles of vibration analysis and infrared thermography in monitoring air-handling equipment
NASA Astrophysics Data System (ADS)
Wurzbach, Richard N.
2003-04-01
Industrial and commercial building equipment maintenance has not historically been targeted for implementation of PdM programs. The focus instead has been on manufacturing, aerospace and energy industries where production interruption has significant cost implications. As cost-effectiveness becomes more pervasive in corporate culture, even office space and labor activities housed in large facilities are being scrutinized for cost-cutting measures. When the maintenance costs for these facilities are reviewed, PdM can be considered for improving the reliability of the building temperature regulation, and reduction of maintenance repair costs. An optimized program to direct maintenance resources toward a cost effective and pro-active management of the facility can result in reduced operating budgets, and greater occupant satisfaction. A large majority of the significant rotating machinery in a large building environment are belt-driven air handling units. These machines are often poorly designed or utilized within the facility. As a result, the maintenance staff typically find themselves scrambling to replace belts and bearings, going from one failure to another. Instead of the reactive-mode maintenance, some progressive and critical institutions are adopting predictive and proactive technologies of infrared thermography and vibration analysis. Together, these technologies can be used to identify design and installation problems, that when corrected, significantly reduce maintenance and increase reliability. For critical building use, such as laboratories, research facilities, and other high value non-industrial settings, the cost-benefits of more reliable machinery can contribute significantly to the operational success.
Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem
NASA Technical Reports Server (NTRS)
Kleiner, G. N.
1981-01-01
The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...
Code of Federal Regulations, 2011 CFR
2011-01-01
..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...
Influence of forces acting on side of machine on precision machining of large diameter holes
NASA Astrophysics Data System (ADS)
Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.
2018-03-01
One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.
Solar heating and hot water system installed at Saint Louis, Missouri
NASA Technical Reports Server (NTRS)
1980-01-01
The solar heating and hot water system installed at the William Tao & Associates, Inc., office building in St. Louis, Missouri is described, including maintenance and construction problems, final drawings, system requirements, and manufacturer's component data. The solar system was designed to provide 50 percent of the hot water requirements and 45 percent of the space heating needs for a 900 sq ft office space and drafting room. The solar facility has 252 sq ft of glass tube concentrator collectors and a 1000 gallon steel storage tank buried below a concrete slab floor. Freeze protection is provided by a propylene glycol/water mixture in the collector loop. The collectors are roof mounted on a variable tilt array which is adjusted seasonally and is connected to the solar thermal storage tank by a tube-in-shell heat exchanger. Incoming city water is preheated through the solar energy thermal storage tank.
Laboratory services series: a master-slave manipulator maintenance program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenness, R. G.; Hicks, R. E.; Wicker, C. D.
1976-12-01
The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance.
46 CFR 181.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
NREL Supports Innovative Offshore Wind Energy Projects | News | NREL
installation, operation, and maintenance methods for wind turbines located far from shore. Fishermen's Energy will also use the twisted-jacket foundation for the five 5-MW turbines it plans to install 3 miles off about offshore wind and investigate interactions between turbines. Principle Power will install five 6
30 CFR 28.3 - Installation, use, and maintenance of approved fuses.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES General Provisions § 28.3 Installation, use, and... standards prescribed for short-circuit protective devices for trailing cables in Parts 75 and 77, Subchapter...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...
Is Africa a 'Graveyard' for Linear Accelerators?
Reichenvater, H; Matias, L Dos S
2016-12-01
Linear accelerator downtimes are common and problematic in many African countries and may jeopardise the outcome of affected radiation treatments. The predicted increase in cancer incidence and prevalence on the African continent will require, inter alia, improved response with regard to a reduction in linear accelerator downtimes. Here we discuss the problems associated with the maintenance and repair of linear accelerators and propose alternative solutions relevant for local conditions in African countries. The paper is based on about four decades of experience in capacity building, installing, commissioning, calibrating, servicing and repairing linear accelerators in Africa, where about 40% of the low and middle income countries in the world are geographically located. Linear accelerators can successfully be operated, maintained and repaired in African countries provided proper maintenance and repair plans are put in place and executed. Copyright © 2016 The Royal College of Radiologists. Published by Elsevier Ltd. All rights reserved.
Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…
ERIC Educational Resources Information Center
California State Univ., Sacramento. Dept. of Civil Engineering.
Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2014 CFR
2014-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2013 CFR
2013-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?
Code of Federal Regulations, 2012 CFR
2012-07-01
... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...
Installing Portable Classrooms With Good Air Quality.
ERIC Educational Resources Information Center
Godfrey, Ray
2000-01-01
Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)
Code of Federal Regulations, 2010 CFR
2010-07-01
..., industrial facilities, cemeteries, etc., generally will be designated as an installation where located... than for the production of materiel, munitions, or supplies. (f) Industrial installation. Any unit of... leased to the United States, substantially equipped with production utilities and maintenance machinery...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...
Installation package for air flat plate collector
NASA Technical Reports Server (NTRS)
1977-01-01
The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.
Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…
Operation and maintenance cost data for residential photovoltaic modules/panels
NASA Technical Reports Server (NTRS)
Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.
1980-01-01
Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.
Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jenness, R.G.; Wicker, C.D.
1975-01-01
The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer- programmed maintenance system has been established at the Laboratory. (auth)
Aircraft Electronics Maintenance Training Simulator. Curriculum Outlines.
ERIC Educational Resources Information Center
Blackhawk Technical Coll., Janesville, WI.
Instructional materials are provided for nine courses in an aircraft electronics maintenance training program. Courses are as follows: aviation basic electricity, direct current and alternating current electronics, basic avionic installations, analog electronics, digital electronics, microcomputer electronics, radio communications, aircraft…
Code of Federal Regulations, 2010 CFR
2010-04-01
... zone fatalities and injuries to workers and road users by establishing minimum requirements and..., installation and maintenance of temporary traffic control devices, and use of uniformed law enforcement officers during construction, utility, and maintenance operations, and by requiring contract pay items to...
Code of Federal Regulations, 2012 CFR
2012-01-01
... appliance repairs, modifications, or equipment installations. (e) A quality control system for acquiring... tracking maintenance actions; inspections; and the flight hours, cycles, and calendar times of life-limited...
Code of Federal Regulations, 2013 CFR
2013-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...
Partial-depth repair of jointed PCC pavements : cast-in-place and precast procedures.
DOT National Transportation Integrated Search
1977-01-01
The installation of durable patches on jointed portland cement concrete pavement using several types of cast-in-place concrete, is described. The recommended procedures for pavement preparation and patch installation are given, and additional mainten...
Code of Federal Regulations, 2010 CFR
2010-04-01
... mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging... prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the...
Code of Federal Regulations, 2012 CFR
2012-04-01
... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...
Code of Federal Regulations, 2013 CFR
2013-04-01
... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...
Code of Federal Regulations, 2014 CFR
2014-04-01
... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...
DOT National Transportation Integrated Search
2011-06-01
In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...
DOT National Transportation Integrated Search
2011-06-01
In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...
Carpeting/Flooring: Revitalizing Carpets.
ERIC Educational Resources Information Center
Woolford, Alison; Hill, Michael
2003-01-01
With properly specified fiber and a comprehensive maintenance program, school carpets can retain their appearance longer. Discusses carpet characteristics; proper carpet installation; effective preventive-maintenance programs (keep outside areas clean, use soil barriers, protect desk areas, maintain HVAC systems, and specify eating, drinking, and…
HVAC--the importance of clean intake section and dry air filter in cold climate.
Hanssen, S O
2004-01-01
HVAC systems, if properly designed, installed, operated and maintained, will improve thermal conditions and air quality indoors. However, the success strongly depends on the design of the system and the quality of the components we use in our HVAC installations. Regrettably, several investigations have revealed that many HVAC installations have a lot of operational and maintenance problems, especially related to moisture, rain and snow entrainment. In short, it seems that too little attention is placed on the design of the intake section, despite the fact that there exists a large number of national and international guidelines and recommendations. This is a serious problem because the air intake is the initial component of the ventilation plant and as such the first line of defense against debris and other outdoor air pollutants. Unfortunately, the design is often an argued compromise between the architect, the civil engineer and the HVAC engineer. In the future, the technical, hygienic and microbiological feature of air intakes must be better ensured in order to avoid the air intake becoming a risk component as regards contamination and indoor air quality. Further, it seems that the magnitude of the problem is not well known, or recognized, by the building designers, engineers and professionals involved in the construction and operation of buildings. This fact needs to be addressed more seriously, because obviously there is a big difference between the idealistic architectonic design, engineering intentions and the real life situation. Several practical recommendations for design and operation of HVAC systems are presented. Following the recommendations will result in less pollution from the HVAC-system and increased indoor environmental quality.
Design and installation package for the Sunmat Flat Plate solar collector
NASA Technical Reports Server (NTRS)
1978-01-01
The information used in evaluating the design of a liquid flat plate solar collector is reported. Included in this package are subsystem performance specification, installation, operation and maintenance manuals, collector sizing guides, and detailed drawings of the single-glazed collector.
Remote monitoring as a tool in condition assessment of a highway bridge
NASA Astrophysics Data System (ADS)
Tantele, Elia A.; Votsis, Renos A.; Onoufriou, Toula; Milis, Marios; Kareklas, George
2016-08-01
The deterioration of civil infrastructure and their subsequent maintenance is a significant problem for the responsible managing authorities. The ideal scenario is to detect deterioration and/or structural problems at early stages so that the maintenance cost is kept low and the safety of the infrastructure remains undisputed. The current inspection regimes implemented mostly via visual inspection are planned at specific intervals but are not always executed on time due to shortcomings in expert personnel and finance. However the introduction of technological advances in the assessment of infrastructures provides the tools to alleviate this problem. This study describes the assessment of a highway RC bridge's structural condition using remote structural health monitoring. A monitoring plan is implemented focusing on strain measurements; as strain is a parameter influenced by the environmental conditions supplementary data are provided from temperature and wind sensors. The data are acquired using wired sensors (deployed at specific locations) which are connected to a wireless sensor unit installed at the bridge. This WSN application enables the transmission of the raw data from the field to the office for processing and evaluation. The processed data are then used to assess the condition of the bridge. This case study, which is part of an undergoing RPF research project, illustrates that remote monitoring can alleviate the problem of missing structural inspections. Additionally, shows its potential to be the main part of a fully automated smart procedure of obtaining structural data, processed them and trigger an alarm when certain undesirable conditions are met.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.
This report summarizes measured performance of residential geothermal heat pumps (GHP`s) that were installed in family housing units at Ft. Hood, Texas and at Selfridge Air National Guard base in Michigan. These units were built as part of a joint Department of Defense/Department of Energy program to evaluate the energy savings potential of GHP`s installed at military facilities. At the Ft. Hood site, the GHP performance was compared to conventional forced air electric air conditioning and natural gas heating. At Selfridge, the homes under test were originally equipped with electric baseboard heat and no air conditioning. Installation of the GHPmore » systems at both sites was straightforward but more problems and costs were incurred at Selfridge because of the need to install ductwork in the homes. The GHP`s at both sites produced impressive energy savings. These savings approached 40% for most of the homes tested. The low cost of energy on these bases relative to the incremental cost of the GHP conversions precludes rapid payback of the GHP`s from energy savings alone. Estimates based on simple payback (no inflation and no interest on capital) indicated payback times from 15 to 20 years at both sites. These payback times may be reduced by considering the additional savings possible due to reduced maintenance costs. Results are summarized in terms of 15 minute, hourly, monthly, and annual performance parameters. The results indicate that all the systems were working properly but several design shortcomings were identified. Recommendations are made for improvements in future installations at both sites.« less
Technology for Water Treatment (National Water Management)
NASA Technical Reports Server (NTRS)
1992-01-01
The buildup of scale and corrosion is the most costly maintenance problem in cooling tower operation. Jet Propulsion Laboratory successfully developed a non-chemical system that not only curbed scale and corrosion, but also offered advantages in water conservation, cost savings and the elimination of toxic chemical discharge. In the system, ozone is produced by an on-site generator and introduced to the cooling tower water. Organic impurities are oxidized, and the dissolved ozone removes bacteria and scale. National Water Management, a NASA licensee, has installed its ozone advantage systems at some 200 cooling towers. Customers have saved money and eliminated chemical storage and discharge.
Survey of HEPA filter applications and experience at Department of Energy sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbaugh, E.H.
1981-11-01
Results indicated that approximately 58% of the filters surveyed were changed out in the 1977 to 1979 study period and some 18% of all filters were changed out more than once. Most changeouts (60%) were due to the existence of a high pressure drop across the filter, indicative of filter plugging. The next most recurrent reasons for changeout and their percentage changeouts were leak test failure (15%) and preventive maintenance service life limit (12%). An average filter service life was calculated to be 3.0 years with a 2.0-year standard deviation. The labor required for filter changeout was calculated as 1.5more » manhours per filter changed. Filter failures occurred with approximately 12% of all installed filters. Most failures (60%) occurred for unknown reasons and handling or installation damage accounted for an additional 20% of all failures. Media ruptures, filter frame failures and seal failures occurred with approximately equal frequency at 5 to 6% each. Subjective responses to the questionnaire indicate problems are: need for improved acid and moisture resistant filters; filters more readily disposable as radioactive waste; improved personnel training in filter handling and installation; and need for pretreatment of air prior to HEPA filtration.« less
Installation package for a solar heating and hot water system
NASA Technical Reports Server (NTRS)
1978-01-01
Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...
Code of Federal Regulations, 2012 CFR
2012-07-01
... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 236.1043 - Task analysis and basic requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...
49 CFR 193.2707 - Operations and maintenance.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...
49 CFR 193.2707 - Operations and maintenance.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...
49 CFR 236.26 - Buffing device, maintenance.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions... be maintained so as not to cause the signal to display a less restrictive aspect than intended. Track...
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...
Gao, Johnway [Richland, WA; Skeen, Rodney S [Pendleton, OR
2002-05-28
The present invention is a pulse spilling self-aerator (PSSA) that has the potential to greatly lower the installation, operation, and maintenance cost associated with aerating and mixing aqueous solutions. Currently, large quantities of low-pressure air are required in aeration systems to support many biochemical production processes and wastewater treatment plants. Oxygen is traditionally supplied and mixed by a compressor or blower and a mechanical agitator. These systems have high-energy requirements and high installation and maintenance costs. The PSSA provides a mixing and aeration capability that can increase operational efficiency and reduce overall cost.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Easton, C. R.
The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less
40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air... baghouse applied to pushing emissions, you must install, operate, and maintain each bag leak detection...
26 CFR 1.954-4 - Foreign base company services income.
Code of Federal Regulations, 2014 CFR
2014-04-01
... substantial assistance when taken together or in combination with other assistance furnished by a related... A is paid by related corporation M for the installation and maintenance of industrial machines which... manufactures an industrial machine which requires specialized installation. Corporation M sells the machines...
Code of Federal Regulations, 2014 CFR
2014-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baldock, Nick; Sevilla, Fernando; Redfern, Robin
The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 ismore » to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.« less
System administrator`s guide to CDPS. Version 1.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Didier, B.T.; Portwood, M.H.
The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less
Project SAGE: solar assisted gas energy. Final report and executive summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less
Code of Federal Regulations, 2014 CFR
2014-07-01
..., operate, and maintain a CEMS to monitor CO and either O2 or CO2 according to the requirements in... program must be part of the maintenance plan for the engine. (j) If you own or operate a stationary SI...
Carpentry and Finishing Procedures. Building Maintenance. Module II. Instructor's Guide.
ERIC Educational Resources Information Center
Hawk, Sam; Brunk, Art
This curriculum guide, keyed to the building maintenance competency profile developed by industry and education professionals, provides three units on carpentry and finishing procedures. The first unit, Exterior Carpentry, contains the following lessons: carpentry safety procedures, ladder and scaffolding safety, door installation/repair,…
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and maintenance requirements for my weight measurement device? 63.9525 Section 63.9525 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for...
10 CFR 434.403 - Building mechanical systems and equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...
10 CFR 434.403 - Building mechanical systems and equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...
10 CFR 434.403 - Building mechanical systems and equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...
Aviation Maintenance Technology. General. G104 Technical Mechanics. Instructor Material.
ERIC Educational Resources Information Center
Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.
These instructor materials for an aviation maintenance technology course contain five instructional modules. The modules cover the following topics: performing aircraft ground handling and servicing, using hand and power tools and precision measuring instruments, identifying and selecting aircraft hardware, fabricating and installing rigid and…
Performance and cavitation characteristics of bi-directional hydrofoils
NASA Astrophysics Data System (ADS)
Nedyalkov, Ivaylo; Wosnik, Martin
2013-11-01
Tidal turbines extract energy from flows which reverse direction. One way to address this bi-directionality in horizontal axis turbines that avoid the use of complex and maintenance-intensive yaw or blade pitch mechanisms, is to design bi-directional blades which perform (equally) well in either flow direction. A large number of proposed hydrofoil designs were investigated using numerical simulations. Selected candidate foils were also tested (at various speeds and angles of attack) in the High-Speed Cavitation Tunnel (HICaT) at the University of New Hampshire. Lift and drag were measured using a force balance, and cavitation inception and desinence were recorded. Experimental and numerical results were compared, and the foils were compared to each other and to reference foils. Bi-directional hydrofoils may provide a feasible solution to the problem of reversing flow direction, when their performance and cavitation characteristics are comparable to those for unidirectional foils, and the penalty in decreased energy production is outweighed by the cost reduction due to lower complexity and respectively lower installation and maintenance costs.
40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...
40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...
40 CFR 63.11180 - What definitions do I need to know?
Code of Federal Regulations, 2012 CFR
2012-07-01
... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...
40 CFR 63.11180 - What definitions do I need to know?
Code of Federal Regulations, 2014 CFR
2014-07-01
... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...
40 CFR 63.11180 - What definitions do I need to know?
Code of Federal Regulations, 2011 CFR
2011-07-01
... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...
40 CFR 63.11180 - What definitions do I need to know?
Code of Federal Regulations, 2010 CFR
2010-07-01
... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...
40 CFR 63.11180 - What definitions do I need to know?
Code of Federal Regulations, 2013 CFR
2013-07-01
... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...
29 CFR 570.67 - Occupations in roofing operations and on or about a roof (Order 16).
Code of Federal Regulations, 2014 CFR
2014-07-01
... proximity to a roof, including carpentry and metal work, alterations, additions, maintenance and repair... or metal), including roof trusses or joists; gutter and downspout work; the installation and... work performed in connection with the installation of roofs, including related metal work such as...
NASA Technical Reports Server (NTRS)
1975-01-01
A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.
78 FR 34605 - Airworthiness Directives; CFM International S.A. Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-10
... with a handcranking pad ``oil dynamic seal'' assembly. This proposed AD was prompted by 42 events of... of the pad cover for maintenance until installation of a handcranking pad oil dynamic seal assembly... maintenance. Introduction of a handcranking pad oil dynamic seal is available as an optional terminating...
Language Maintenance at a Distance: The Daily Russian "Vitamin."
ERIC Educational Resources Information Center
Valentine, Susan M.; Supinski, Stanley B.; Sutherland, Richard L.
This study addressed how to maintain "use or lose" language skills among Department of Defense linguists. The study, which involved over 300 linguists at 61 installations worldwide, supported the Air Force strategy of global engagement by regularly providing pedagogically sound language maintenance materials in small doses and…
Developing a Predictive Model for Facility Repair Costs on United States Air Force Installations
2011-06-01
repair activities at different times ( Durango & Madanat, 2002). Christian and Pandeya (1997) define maintenance as “the effort to keep a device or...Washington DC: Secretary of the Air Force, Financial Management. Durango , P. L., & Madanat, S. M. (2002). Optimal maintenance and repair policies in
40 CFR 142.307 - What terms and conditions must be included in a small system variance?
Code of Federal Regulations, 2010 CFR
2010-07-01
... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...
Code of Federal Regulations, 2014 CFR
2014-01-01
... category. (h) Notwithstanding the provisions of paragraph (g) of this section, the Administrator may... Product and Process Specification issued by the Administrator; and (3) Perform any inspection required by... manufactures under a production certificate. (k) Updates of databases in installed avionics meeting the...
The Development and Implementation of Noise Control Measures on AN Urban Railway
NASA Astrophysics Data System (ADS)
Fitzgerald, B. M.
1996-05-01
This paper describes the development and implementation of noise control measures by Docklands Light Railway (DLR), London, to meet obligations set out in its Noise and Vibration Policy, adherence to which is set by an Act of the U. K. Parliament. Noise levels from the operational railway exceeded targets given in the policy at two noise-sensitive urban residential sites. Following diagnosis by noise survey of the problems specific to each site and by noise reduction predictions, acoustic absorbent screens were installed which, it was subsequently demonstrated, succeeded in providing the required level of noise reduction. These schemes needed to accommodate the requirements of the railway for maintenance (leading to the barriers having to be fully demountable), safe trackside walking routes and easy passenger evacuation from trains. During construction, liaison was developed with the local authority for the control of environmental pollution (primarily noise) and hours of working (which had to suit railway possessions) and good relations were fostered with local residents through regular contact. Fulfilment of project objectives was demonstrated by a programme of post-installation noise measurements. The paper concludes with an evaluation of noise mitigation performance achieved together with a suggested alternative strategy for addressing the noise problem from a system-wide perspective.
NASA Astrophysics Data System (ADS)
Norazam Yasin, Mohd; Mohamad Zin, Rosli; Halid Abdullah, Abd; Shafiq Mahmad, Muhammad; Fikri Hasmori, Muhammad
2017-11-01
From time to time, the maintenance works become more challenging due to construction of new building and also aging of the existing buildings. University buildings without any exception require proper maintenance services to support their function requirements and this can be considered as major responsibilities to be fulfilled by the maintenance department in the universities. Maintenance department specifically will face various kinds of problems in their operation works and thus this might influence the maintenance work operations itself. This study purposely to identify the common problem facing by the maintenance department and also to examine the current status of the maintenance department. In addition, this study would also propose any suitable approach that could be implemented to overcome the problem facing by the maintenance department. To achieve the objectives of this study, a combination of deep literature study and carrying out a survey is necessary. Literature study aimed to obtain deeper information about this study, meanwhile a survey aimed at identifying the common problem facing by the maintenance department and also to provide the information of the maintenance department’s organization. Several methods will be used in analyzing the data obtained through the survey, including Microsoft Office Excel and also using mean index formula. This study has identified three categories of problem in the maintenance department, which are management problems, human resource problem, and technical problems. Following the findings, several solutions being proposed which can be implemented as the solution to the problem facing. These suggestions have the potential to improve the maintenance department work efficiency, thus could help to increase the department productivity.
NASA Technical Reports Server (NTRS)
Fineberg, Samuel A.; Kutler, Paul (Technical Monitor)
1997-01-01
The Whitney project is integrating commodity off-the-shelf PC hardware and software technology to build a parallel supercomputer with hundreds to thousands of nodes. To build such a system, one must have a scalable software model, and the installation and maintenance of the system software must be completely automated. We describe the design of an architecture for booting, installing, and configuring nodes in such a system with particular consideration given to scalability and ease of maintenance. This system has been implemented on a 40-node prototype of Whitney and is to be used on the 500 processor Whitney system to be built in 1998.
The importance of ships and spare parts in LCAs of offshore wind power.
Arvesen, Anders; Birkeland, Christine; Hertwich, Edgar G
2013-03-19
We develop and assess life cycle inventories of a conceptual offshore wind farm using a hybrid life cycle assessment (LCA) methodology. Special emphasis is placed on aspects of installation, operation, and maintenance, as these stages have been given only cursory consideration in previous LCAs. The results indicate that previous studies have underestimated the impacts caused by offshore operations and (though less important) exchange of parts. Offshore installation and maintenance activities cause 28% (10 g CO(2)-Eq/kWh) of total greenhouse gas emissions and 31-45% of total impact indicator values at the most (marine eutrophication, acidification, particulates, photochemical ozone). Transport and dumping of rock in installation phase and maintenance of wind turbines in use phase are major contributory activities. Manufacturing of spare parts is responsible for 6% (2 g CO2-Eq/kWh) of greenhouse gas emissions and up to 13% of total impact indicator values (freshwater ecotoxicity). Assumptions on lifetimes, work times for offshore activities and implementation of NOx abatement on vessels are shown to have a significant influence on results. Another source of uncertainty is assumed operating mode data for vessels determining fuel consumption rates.
Feasibility study of a 270V dc flat cable aircraft electrical power distributed system
NASA Astrophysics Data System (ADS)
Musga, M. J.; Rinehart, R. J.
1982-01-01
This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, L.E.; McGuire, D.R.
1984-05-01
This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less
A flight test of laminar flow control leading-edge systems
NASA Technical Reports Server (NTRS)
Fischer, M. C.; Wright, A. S., Jr.; Wagner, R. D.
1983-01-01
NASA's program for development of a laminar flow technology base for application to commercial transports has made significant progress since its inception in 1976. Current efforts are focused on development of practical reliable systems for the leading-edge region where the most difficult problems in applying laminar flow exist. Practical solutions to these problems will remove many concerns about the ultimate practicality of laminar flow. To address these issues, two contractors performed studies, conducted development tests, and designed and fabricated fully functional leading-edge test articles for installation on the NASA JetStar aircraft. Systems evaluation and performance testing will be conducted to thoroughly evaluate all system capabilities and characteristics. A simulated airline service flight test program will be performed to obtain the operational sensitivity, maintenance, and reliability data needed to establish that practical solutions exist for the difficult leading-edge area of a future commercial transport employing laminar flow control.
40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2011 CFR
2011-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2014 CFR
2014-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2012 CFR
2012-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...
DOT National Transportation Integrated Search
1984-01-01
The installation of a thin polymer concrete overlay on the Big Swan Creek Bridge provides further evidence that an overlay of low permeability can be soundly bonded to a concrete bridge deck by maintenance forces with a minimum of disruption to traff...
equipped with EVSE is responsible for the cost of the installation, maintenance, repair, removal, or restrict the installation or use of EVSE in a homeowner's designated parking space. These entities may put reasonable restrictions on EVSE, but the policies may not significantly increase the cost of the EVSE or
the installation, maintenance, repair, removal, or replacement of the EVSE. A private entity includes days of installation, and the homeowner receives consent from the private entity if the EVSE is placed in a common area. Private entities may adopt rules that restrict the placement and use of EVSE but
46 CFR 118.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
46 CFR 118.410 - Fixed gas fire extinguishing systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...
Installation package - SIMS prototype system 1A
NASA Technical Reports Server (NTRS)
1976-01-01
This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.
Installation package for SIMS prototype system 2, solar hot water
NASA Technical Reports Server (NTRS)
1978-01-01
The prototype system 2 solar hot water was designed for use in a single family dwelling and consists of the following subsystems: collector, storage, energy transport, and control. Guidelines are presented for utilization in the development of detailed installation plans and specifications. Instruction on operation, maintenance, and repair of the system is discussed.
40 CFR 63.2366 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitoring installation... Distribution (Non-Gasoline) Testing and Initial Compliance Requirements § 63.2366 What are my monitoring... controlling storage tanks and low throughput transfer racks, you must submit a monitoring plan according to...
ERIC Educational Resources Information Center
Lane, Billy D.
The ground terminals for the Satellite Technology Demonstration were more expensive to install than was anticipated because crews forced to make numerous visits to each site. Delays were caused by delinquent deliveries and by malfunctions in some of the subsystems. Insufficient time was allowed for trouble shooting, and consequently, additional…
Development of a Navy Job-Specific Vocational Interest Model
2006-12-01
Enforcement Air Systems Installation/Repair Maritime Interests Applied Mathematics Media Arts Aviation Interests Medical and Dental Services...Technician (AS) 9. Aviation Electronics Technician (AT) 10. Aviation Maintenance Administrationman (AZ) 11. Culinary Specialist (CS) 12. Cryptologic...equipment. 90. Perform preventive and corrective maintenance on state-of-the- art electronic and electromechanical equipment and systems, requiring
Code of Federal Regulations, 2013 CFR
2013-01-01
... provisions of paragraph (g) of this section, the Administrator may approve a certificate holder under Part... Administrator; and (3) Perform any inspection required by part 91 or part 125 of this chapter on aircraft it..., and alterations. (k) Updates of databases in installed avionics meeting the conditions of this...
North American Board of Certified Energy Practitioners Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, Richard
The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less
Preventive medicine oversight of splash pads on military installations.
Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley
2015-01-01
Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.
WOGEN. Work Order Generation Macros for Word Perfect 6.X for Windows
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grenz, G.
Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO`s) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less
Work Order Generation Macros for Word Perfect 6.X for Windows
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grenz, Gordon G.
Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO's) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less
40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...
ERIC Educational Resources Information Center
Haworth-Roberts, A., Ed.
Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…
Solar-energy landmark Building-Columbia, Missouri
NASA Technical Reports Server (NTRS)
1981-01-01
Report includes design, cost, installation, maintenance, and performance details for attractive solar installation which supplies space heating for four-story Visitors Center. 176 hydronic flat-plate collectors, water-to-water heat exchanger, and 5,000-gallon storage tank comprise system which provides 71 percent of building's heat. Natural-gas-fired boiler supplies auxiliary hot water to heating system when necessary.
Installation package maxi-therm S-101 heating module
NASA Technical Reports Server (NTRS)
1977-01-01
The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.
Solar Water Heater Installation Package
NASA Technical Reports Server (NTRS)
1982-01-01
A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.
TIGER TM : Intelligent continuous monitoring of gas turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKay, I.; Hibbert, J.; Milne, R.
1998-07-01
The field of condition monitoring has been an area of rapid growth, with many specialized techniques being developed to measure or predict the health of a particular item of plant. Much of the most recent work has gone into the diagnosis of problems on rotating machines through the application of vibration analysis techniques. These techniques though useful can have a number of limiting factors, such as the need to install specialized sensors and measurement equipment, or the limited scope of the type of data measured. It was recognized in 1992, that the surveillance and condition monitoring procedures available for criticalmore » plant, such as gas turbines, were not as comprehensive as they might be and that a novel approach was required to give the operator the necessary holistic view of the health of the plant. This would naturally provide an assessment of the maintenance practices required to yield the highest possible availability without the need to install extensive new instrumentation. From the above objective, the TIGER system was designed which utilizes available data from the gas turbine control system or additionally the plant DCS to measure the behavior of the gas turbine and its associated sub systems. These measured parameters are then compared with an internal model of the turbine system and used to diagnose incorrect responses and therefore the item that is at fault, allowing the operator to quickly restart the turbine after a trip or perform condition based maintenance at the next scheduled outage. This philosophy has been built into the TIGER system and the purpose of this paper is to illustrate its functionality and some of the innovative techniques used in the diagnosis of real gas turbine problems. This is achieved by discussing three case studies where TIGER was integral in returning the plant to operation more quickly than can normally be expected.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bagdon, M.J.; Martin, P.J.
1997-06-01
In 1994, Novus Engineering and EME Group began a project for the New York State Office of Mental Health (OMH) to maximize the use and benefit of energy management systems (EMS) installed at various large psychiatric hospitals throughout New York State. The project, which was funded and managed by the Dormitory Authority of the State of New York (DASNY), had three major objectives: (1) Maximize Energy Savings - Novus staff quickly learned that EMS systems as set up by contractors are far from optimal for generating energy savings. This part of the program revealed numerous opportunities for increased energy savings,more » such as: fine tuning proportional/integral/derivative (PID) loops to eliminate valve and damper hunting; adjusting temperature reset schedules to reduce energy consumption and provide more uniform temperature conditions throughout the facilities; and modifying equipment schedules. (2) Develop Monitoring Protocols - Large EMS systems are so complex that they require a systematic approach to daily, monthly and seasonal monitoring of building system conditions in order to locate system problems before they turn into trouble calls or equipment failures. In order to assist local facility staff in their monitoring efforts, Novus prepared user-friendly handbooks on each EMS. These included monitoring protocols tailored to each facility. (3) Provide Staff Training - When a new EMS is installed at a facility, it is frequently the maintenance staffs first exposure to a complex computerized system. Without proper training in what to look for, staff use of the EMS is generally very limited. With proper training, staff can be taught to take a pro-active approach to identify and solve problems before they get out of hand. The staff then realize that the EMS is a powerful preventative maintenance tool that can be used to make their work more effective and efficient. Case histories are presented.« less
Resurgence: The Unintended Maintenance of Problem Behavior
ERIC Educational Resources Information Center
Ringdahl, Joel E.; St. Peter, Claire
2017-01-01
Researchers, teachers, practitioners, and parents are often concerned with how to program for and achieve the maintenance of appropriate behavior. The unintended maintenance of problem behavior is less often evaluated. This article describes a behavioral phenomenon, resurgence, that may result in the unintended maintenance of problem behavior.…
WaterSense recognizes certification programs for irrigation professionals that meet the specification criteria. Certification programs cover three areas: irrigation system design, installation and maintenance, and system auditing.
1986-07-01
Reserves staffing. A comparison with the Navy technique, which requires estimates of mileage and operating hours, was not possible since these data were...Directorate of Engineering and Housing (DEH) vehicle maintenance activities. To make comparisons, manpower requirements data totaling two megabytes of
ERIC Educational Resources Information Center
Rodekohr, Sherie; Waeckerle, Debi
This instructor guide and the corresponding student reference contain 12 units, which cover the following topics: (1) opportunities in the landscaping and turfgrass industries; (2) how plants grow; (3) plant identification; (4) hand and power tools (identification and maintenance); (5) pesticides; (6) installation and maintenance of trees and…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid... installation of associated aboveground mainline block valves; and the use of access roads and pipe storage and... Permit authorizing the construction, connection, operation, and maintenance of the Cross Border Facility...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2011 CFR
2011-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
15 CFR 740.20 - License Exception Strategic Trade Authorization (STA).
Code of Federal Regulations, 2014 CFR
2014-01-01
..., maintenance, repair, overhaul, or refurbishing of an item in one of the countries listed in Country Group A:5...,” “production,” operation installation, maintenance, repair, overhaul, or refurbishing of an item in one of the...) Agrees to permit a U.S. Government end-use check with respect to the items. (3) Notification to consignee...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2012 CFR
2012-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2013 CFR
2013-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
14 CFR 121.343 - Flight data recorders.
Code of Federal Regulations, 2014 CFR
2014-01-01
... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...
Computer Associates International, CA-ACF2/VM Release 3.1
1987-09-09
Associates CA-ACF2/VM Bibliography International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Program Logic Manual...publication number LY20-0889 International Business Machines International Business Machines Corporation, IBM System/370 Principles of Operation...publication number GA22-7000 International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Installation and System Administrator’s
NASA Global GNSS Network (GGN) Status and Plans
NASA Astrophysics Data System (ADS)
Doelger, S.; Sklar, J.; Blume, F.; Meertens, C. M.; Mattioli, G. S.
2015-12-01
UNAVCO, in conjunction with JPL, is responsible for monitoring the 62 GNSS permanent stations, which include 88 GPS receivers, which comprise the NASA Global GNSS Network (GGN). These sites represent approximately 16% of the ~400 International GNSS Service (IGS) stations, and they provide a globally distributed GNSS network to support NASA operations and its commitments to GGOS. UNAVCO provides data flow monitoring, trouble-shooting, station installation, maintenance, as well as engineering services to improve the capabilities and performance of station infrastructure. Activities this past year include the installation of a geodetic quality wellhead monument for the new SEY2 station to replace SEY1, which is mounted on a UCSD seismic station in the Seychelles Islands. SEY1 will be removed soon to accommodate planned maintenance and upgrades by UCSD. Data from both SEY1 and SEY2 are being collected concurrently until maintenance begins. MRTG (Multi Router Traffic Grapher), a tool to aid in characterizing bandwidth usage and to identify communications problems, is now being used to monitor data throughput at 7 stations where VSAT or radio telemetry are used, including: ABPO; AREQ; FALK; GUAM; HARV; ISPA; QUIN; and STHL. Aging computers are being replaced with new hardware running Linux CentOS. These are semi-ruggedized low power solid-state systems built to endure challenging environments. With the aid of on-site collaborators, systems are now deployed at: FALK; CUSV; KELY; STHL; SANT; and ZAMB. Last, 4 new GPS stations were deployed for NASA's Space Geodesy Project (SGP); three of which (KOKF, KOKG, and KOKR) are located at Koke'e Park Geophysical Observatory on Kauai, Hawai'i, and HAL1 at the Haleakala observatory complex on Maui, Hawai'i. A campaign system was set up at Koke'e in order to sample data quality to determine if an additional station would be viable. Planning is ongoing for deployment of several new stations next year at McDonald Observatory (TX).
40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?
Code of Federal Regulations, 2013 CFR
2013-07-01
...; and (2) Install and maintain CPMS to measure and record the pH of the scrubber blowdown according to the requirements in paragraph (e)(2)(i) through (iv) of this section. (i) Locate the pH sensor in a position that provides a representative measurement of the pH and that minimizes or eliminates internal and...
View of STS-134 Crew Members during EVA-1
2011-05-20
S134-E-009265 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at center frame. Photo credit: NASA
View of STS-134 Crew Members during EVA-1
2011-05-20
S134-E-009267 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at lower center frame. Photo credit: NASA
Linac cryogenic distribution system maintenance and upgrades at JLab
NASA Astrophysics Data System (ADS)
Dixon, K.; Wright, M.; Ganni, V.
2014-01-01
The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm3 of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.
Code of Federal Regulations, 2010 CFR
2010-04-01
... designed, installed, and maintained as to prevent contamination of the water supply, food, and food... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Construction, maintenance and use of places where food is prepared, served, or stored. 1250.30 Section 1250.30 Food and Drugs FOOD AND DRUG...
Instruction manual model 600F, data transmission test set
NASA Technical Reports Server (NTRS)
1972-01-01
Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.
ERIC Educational Resources Information Center
Medley, Frank W.
The purpose of this report is to identify the various aspects of language laboratory operation and maintenance as they relate to the teacher and the administrator, and to suggest certain practices which will result in more effective utilization of the installation. Discussion of the language laboratory includes: (1) selection of personnel, (2)…
Perceptual/Psychomotor Requirements Basic to performance in 35 Air Force Specialties.
1980-12-01
Supra-segmental Reflexes c 26. Locomotor Movements¢ 27. Non- Locomotor Movementac 28. Manipulative Movements c 29. Kinesthetic Discrimination 30...auxiliary equipment components for installation (6.10, Ground Radio Equipment Repair) Control Operate standard gasoline or electric powered forklifts...Precision (6.23, Munitions Maintenance) Operate munitions transport trucks or truck-tractors (6.19, Munitions Maintenance) Rate operate standard gasoline or
Code of Federal Regulations, 2012 CFR
2012-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...
ERIC Educational Resources Information Center
Scandrett, Donald G.
1998-01-01
Examines the planning issues when replacing telescoping bleacher units and for analyzing seating options. Adresses the importance of complying with local building codes and the considerations on maintenance following installation. (GR)
40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating limits in § 63.9890(b) for pressure drop and scrubber water flow rate, you must install, operate...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... sensitivity of 0.5 inch of water or a transducer with a minimum measurement sensitivity of 1 percent of the...
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE FUNCTION AND MAINTENANCE OF THE DIESEL ENGINE COOLING SYSTEM AND THE PROCEDURES FOR TRANSMISSION INSTALLATION. TOPICS ARE (1) IMPORTANCE OF THE COOLING SYSTEM, (2) COOLING SYSTEM COMPONENTS, (3) EVALUATING COOLING SYSTEM FAILURES, (4) CARING FOR THE COOLING SYSTEM,…
Solar heating and domestic hot water system installed at North Dallas High School
NASA Technical Reports Server (NTRS)
1980-01-01
The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.
NASA Technical Reports Server (NTRS)
1978-01-01
A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.
With proper installation, programming, and maintenance, homeowners and businesses can use WaterSense labeled controllers instead of standard clock-timer controllers on their existing systems, and no longer worry about wasted water.
2012-11-01
Estrella mountain range is approximately six miles west of the Installation and the Sacaton mountain range lie approximate- ly six miles to the southeast...Structures 3-4 Figure 5. Geological Map of Gila River AFSSS and Vicinity Sierra Estrella Range Sacaton Range EA — Construct Maintenance & Storage
7 CFR 1410.63 - Permissive uses.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., as determined appropriate by the Deputy Administrator. (3) Wind turbines on CRP land installed in... for a payment reduction determined by the Deputy Administrator. (5) Forestry maintenance such as...
Pipeline scada upgrade uses satellite terminal system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrad, W.; Skovrinski, J.R.
In the recent automation of its supervisory control and data acquisition (scada) system, Transwestern Pipeline Co. has become the first to use very small aperture satellite terminals (VSAT's) for scada. A subsidiary of Enron Interstate Pipeline, Houston, Transwestern moves natural gas through a 4,400-mile system from West Texas, New Mexico, and Oklahoma to southern California markets. Transwestern's modernization, begun in November 1985, addressed problems associated with its aging control equipment which had been installed when the compressor stations were built in 1960. Over the years a combination of three different systems had been added. All were cumbersome to maintain andmore » utilized outdated technology. Problems with reliability, high maintenance time, and difficulty in getting new parts were determining factors in Transwestern's decision to modernize its scada system. In addition, the pipeline was anticipating moving its control center from Roswell, N.M., to Houston and believed it would be impossible to marry the old system with the new computer equipment in Houston.« less
NASA Astrophysics Data System (ADS)
Schiffman, Y. M.; Tahami, J. E.
1982-04-01
The materials-resource and hazardous-materials impacts were determined by examining the type and quantity of materials used in the manufacture, construction, installation, operation and maintenance of solar systems. The materials requirements were compared with US materials supply and demand data to determine if potential problems exist in terms of future availability of domestic supply and increased dependence on foreign sources of supply. Hazardous materials were evaluated in terms of public and occupational health hazards and explosive and fire hazards. It is concluded that: although large amounts of materials would be required, the US had sufficient industrial capacity to produce those materials; (2) postulated growth in solar technology deployment during the period 1995-2000 could cause some production shortfalls in the steel and copper industry; the U.S. could increase its import reliance for certain materials such as silver, iron ore, and copper; however, shifts to other materials such as aluminum and polyvinylchloride could alleviate some of these problems.
NASA Astrophysics Data System (ADS)
Zhang, Xingong; Yin, Yunqiang; Wu, Chin-Chia
2017-01-01
There is a situation found in many manufacturing systems, such as steel rolling mills, fire fighting or single-server cycle-queues, where a job that is processed later consumes more time than that same job when processed earlier. The research finds that machine maintenance can improve the worsening of processing conditions. After maintenance activity, the machine will be restored. The maintenance duration is a positive and non-decreasing differentiable convex function of the total processing times of the jobs between maintenance activities. Motivated by this observation, the makespan and the total completion time minimization problems in the scheduling of jobs with non-decreasing rates of job processing time on a single machine are considered in this article. It is shown that both the makespan and the total completion time minimization problems are NP-hard in the strong sense when the number of maintenance activities is arbitrary, while the makespan minimization problem is NP-hard in the ordinary sense when the number of maintenance activities is fixed. If the deterioration rates of the jobs are identical and the maintenance duration is a linear function of the total processing times of the jobs between maintenance activities, then this article shows that the group balance principle is satisfied for the makespan minimization problem. Furthermore, two polynomial-time algorithms are presented for solving the makespan problem and the total completion time problem under identical deterioration rates, respectively.
47 CFR 54.503 - Other supported special services.
Code of Federal Regulations, 2010 CFR
2010-10-01
... telecommunications carriers include voice mail, interconnected voice over Internet protocol (VoIP), text messaging, Internet access, and installation and maintenance of internal connections in addition to all reasonable...
ERIC Educational Resources Information Center
Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.
THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE DIESEL ENGINE LUBRICATION SYSTEM AND THE PROCEDURES FOR REMOVAL AND INSTALLATION OF THE DRIVE LINE USED IN DIESEL ENGINE POWER DISTRIBUTION. TOPICS ARE (1) PROLONGING ENGINE LIFE, (2) FUNCTIONS OF THE LUBRICATING SYSTEM, (3) TRACING THE LUBRICANT FLOW, (4) DETERMINING…
Solar hot water space heating system. Technical progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Dam, T
1979-08-13
A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)
Preliminary design package for maxi-therm heat exchanger module
NASA Technical Reports Server (NTRS)
1978-01-01
Heat exchangers were developed for use in a solar heating and cooling system installed in a single family dwelling. Each of the three exchangers consisted of a heating and cooling module and a submersed electric water heating element. Information necessary to evaluate the preliminary design of the heat exchanger is presented in terms of the development and verification plans, performance specifications, installation and maintenance, and hazard analysis.
Purchasing and Selecting School Lighting.
ERIC Educational Resources Information Center
Berman, Tim
2003-01-01
Discusses factors for schools to consider when deciding on a lighting system: purchase price, installation charges, maintenance costs, energy costs, and ensuring optimal educational environment. Presents best practices in these areas. (EV)
Composite correlation filter for O-ring detection in stationary colored noise
NASA Astrophysics Data System (ADS)
Hassebrook, Laurence G.
2009-04-01
O-rings are regularly replaced in aircraft and if they are not replaced or if they are installed improperly, they can result in catastrophic failure of the aircraft. It is critical that the o-rings be packaged correctly to avoid mistakes made by technicians during routine maintenance. For this reason, fines may be imposed on the o-ring manufacturer if the o-rings are packaged incorrectly. That is, a single o-ring must be packaged and labeled properly. No o-rings or more than one o-ring per package is not acceptable. We present an industrial inspection system based on real-time composite correlation filtering that has successfully solved this problem in spite of opaque paper o-ring packages. We present the system design including the composite filter design.
NASA Technical Reports Server (NTRS)
1980-01-01
The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.
Solar heating system installed at Troy, Ohio
NASA Technical Reports Server (NTRS)
1980-01-01
The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.
Operation and maintenance, fire rescue air-pack. Volume 2: Communications
NASA Technical Reports Server (NTRS)
1972-01-01
The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.
NASA Technical Reports Server (NTRS)
Moe, Rud
2005-01-01
This paper presents viewgraphs on capability structure 9.4 servicing. The topics include: 1) Servicing Description; 2) Benefits of Servicing; 3) Drivers & Assumptions for Servicing; 4) Capability Breakdown Structure 9.4 Servicing; 5) Roadmap for Servicing; 6) 9.4 Servicing Critical Gaps; 7) Capability 9.4 Servicing; 8) Capability 9.4.1 Inspection; 9) State-of-the-Art /Maturity Level /Capabilities for 9.4.1 Inspection; 10) Capability 9.4.2 Diagnostics; 11) State-of-the-Art/Maturity Level /Capabilities for 9.4.2 Diagnostics; 12) Capability 9.4.3 Perform Planned Maintenance; 13) State-of-the-Art /Maturity Level /Capabilities for 9.4.3 Perform Planned Maintenance; 14) Capability 9.4.4 Perform Unplanned Repair; 15) State-of-the-Art /Maturity Level /Capabilities for 9.4.4 Perform Unplanned Repair; 16) Capability 9.4.5 Install Upgrade; 17) Capability 9.4.5 Install Upgrade; 18) State-of-the-Art /Maturity Level /Capabilities for 9.4.5 Install Upgrade; 19) Capability 9.4.6 Planning, Logistics, Training; and 20) State-of-the-Art /Maturity Level /Capabilities for 9.4.6 Planning, Logistics, & Training;
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lenie, Koen; Mulier, Guido; Vandorpe, Marc
Safe decontamination is a regular requirement in the lifecycle of a nuclear plant and is integral to the careful maintenance of any nuclear installation for 4 key reasons: - To decrease the risk of radioactive contamination spreading; - To limit the radioactive doses contracted by maintenance personnel; - To limit the radioactive doses incurred during decommissioning; - To downgrade the class of radioactive waste The primary goal of decommissioning is to remove aged and/or contaminated and/or activated components of an installation, safely and securely, in as short a time as possible. There are several reasons why this may be necessary:more » - To eliminate the risk of radioactive contamination spreading; - To eliminate the risk of radiation; - To downgrade a site or a circuit to a point where it no longer is submitted to regular inspection; - To remove installations or parts that are no longer in service or have aged There are many different D and D techniques, tools and materials available today. What is important is knowing how best to use them. This paper describes the experiences and the future projects of Tecnubel in D and D projects in Belgium and abroad. (authors)« less
Qualitative Maintenance Experience Handbook. P-3C/S-3A Supplement.
1977-06-15
axle which automatically assists in disc alignment, a positive feature, in easing maintenance and preventing casual damage. Brake assemblies should...Reverse Of Removal Use brake tool to align brake discs . After Installation Actions: _ Bleed _ Rig _ Adjust X Service Lubricate - Boresight. _ Other...Hydraulic I Access Required: Test Equipment Required: Actions: 1. Check clearance of discs after brakes are put on. 2. Apply brakes . 8 ANALYST’S COMMENTS
49 CFR 230.44 - Time of testing.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Boilers and Appurtenances Steam Gauges § 230.44 Time of testing. Steam gauges shall be tested prior to being installed or being...
Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dodson, Guy; Pero, Vincent
Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less
49 CFR 236.529 - Roadway element inductor; height and distance from rail.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...
49 CFR 236.529 - Roadway element inductor; height and distance from rail.
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...
49 CFR 236.202 - Signal governing movements over hand-operated switch.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.202 Signal governing movements over hand...
Research on wind power grid-connected operation and dispatching strategies of Liaoning power grid
NASA Astrophysics Data System (ADS)
Han, Qiu; Qu, Zhi; Zhou, Zhi; He, Xiaoyang; Li, Tie; Jin, Xiaoming; Li, Jinze; Ling, Zhaowei
2018-02-01
As a kind of clean energy, wind power has gained rapid development in recent years. Liaoning Province has abundant wind resources and the total installed capacity of wind power is in the forefront. With the large-scale wind power grid-connected operation, the contradiction between wind power utilization and peak load regulation of power grid has been more prominent. To this point, starting with the power structure and power grid installation situation of Liaoning power grid, the distribution and the space-time output characteristics of wind farm, the prediction accuracy, the curtailment and the off-grid situation of wind power are analyzed. Based on the deep analysis of the seasonal characteristics of power network load, the composition and distribution of main load are presented. Aiming at the problem between the acceptance of wind power and power grid adjustment, the scheduling strategies are given, including unit maintenance scheduling, spinning reserve, energy storage equipment settings by the analysis of the operation characteristics and the response time of thermal power units and hydroelectric units, which can meet the demand of wind power acceptance and provide a solution to improve the level of power grid dispatching.
Biofouling reduction in recirculating cooling systems through biofiltration of process water.
Meesters, K P H; Van Groenestijn, J W; Gerritse, J
2003-02-01
Biofouling is a serious problem in industrial recirculating cooling systems. It damages equipment, through biocorrosion, and causes clogging and increased energy consumption, through decreased heat transfer. In this research a fixed-bed biofilter was developed which removed assimilable organic carbon (AOC) from process water, thus limiting the major substrate for the growth of biofouling. The biofilter was tested in a laboratory model recirculating cooling water system, including a heat exchanger and a cooling tower. A second identical model system without a biofilter served as a reference. Both installations were challenged with organic carbon (sucrose and yeast extract) to provoke biofouling. The biofilter improved the quality of the recirculating cooling water by reducing the AOC content, the ATP concentration, bacterial numbers (30-40 fold) and the turbidity (OD660). The process of biofouling in the heat exchangers, the process water pipelines and the cooling towers, was monitored by protein increase, heat transfer resistance, and chlorine demanded for maintenance. This revealed that biofouling was lower in the system with the biofilter compared to the reference installation. It was concluded that AOC removal through biofiltration provides an attractive, environmental-friendly means to reduce biofouling in industrial cooling systems.
Information technology: 1. Planning and developing a human resources information system.
Lederer, A L
1984-01-01
for the unwary, planning and implementing an HRIS can present a variety of pitfalls. Author Albert L. Lederer, who spent ten years installing such systems before joining the faculty of the University of Pittsburgh (as assistant professor of business administration), is fully cognizant of the pitfalls involved and the problems that personnel departments encounter in the process. After discussing what an HRIS can accomplish, he gives a thoroughgoing, detailed approach to developing such a system--from cost justification, to the personnel department's relationship with the data-processing department at each step, to deciding between buying a packaged system and developing a new system internally. Most important, he emphasizes, is to define requirements precisely and completely at the outset--those who don't are in for a lot of costly headaches. Much more is covered in this comprehensive approach--not the least of which is (for packaged systems) vendor analysis and contract negotiation (the contract stipulates the vendor's responsibilities in terms of software, installation service, maintenance, training, and documentation). One popular strategy for negotiating a contract is to choose the best two vendors and compare their offers throughout the negotiation; this results in a contract with excellent leverage for the buyer.
Solar space and water heating system installed at Charlottesville, Virginia
NASA Technical Reports Server (NTRS)
1980-01-01
The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.
2006-11-01
exercises. Potential Resolution: 1. Installations must ensure that they understand the composition of civilian populations outside of their...Installation trainers, SRP Support Agency trainers or contract training specialists should layout each range based on the composition defined in the...defined time limit to respond to submittals with a pre-defined team member composition so that changes could be reviewed consistently. Only mission
The Plate Boundary Observatory Student Field Assistant Program in Southern California
NASA Astrophysics Data System (ADS)
Seider, E. L.
2007-12-01
Each summer, UNAVCO hires students as part of the Plate Boundary Observatory (PBO) Student Field Assistant Program. PBO, the geodetic component of the NSF-funded EarthScope project, involves the reconnaissance, permitting, installation, documentation, and maintenance of 880 permanent GPS stations in five years. During the summer 2007, nine students from around the US and Puerto Rico were hired to assist PBO engineers during the busy summer field season. From June to September, students worked closely with PBO field engineers to install and maintain permanent GPS stations in all regions of PBO, including Alaska. The PBO Student Field Assistant Program provides students with professional hands-on field experience as well as continuing education in the geosciences. It also gives students a glimpse into the increasing technologies available to the science community, the scope of geophysical research utilizing these technologies, and the field techniques necessary to complete this research. Students in the PBO Field Assistant Program are involved in all aspects of GPS support, including in-warehouse preparation and in-field installations and maintenance. Students are taught practical skills such as drilling, wiring, welding, hardware configuration, documentation, and proper field safety procedures needed to construct permanent GPS stations. These real world experiences provide the students with technical and professional skills that are not always available to them in a classroom, and will benefit them greatly in their future studies and careers. The 2007 summer field season in Southern California consisted of over 35 GPS permanent station installations. To date, the Southern California region of PBO has installed over 190 GPS stations. This poster presentation will highlight the experiences gained by the Southern California student field assistants, while supporting PBO- Southern California GPS installations in the Mohave Desert and the Inyo National Forest.
49 CFR 236.204 - Track signaled for movements in both directions, requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...
49 CFR 236.204 - Track signaled for movements in both directions, requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...
49 CFR 236.577 - Test, acknowledgement, and cut-in circuits.
Code of Federal Regulations, 2011 CFR
2011-10-01
... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.577 Test...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.74 - Protection of insulated wire; splice in underground wire.
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...
49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...
76 FR 12629 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... maintenance program by incorporating Task 320100-211 (repetitive detailed inspections of the retraction... installation, and corrosion) and Task 320100-212 (repetitive restorations of the retraction actuator for...
Safety in the Chemical Laboratory: The Selection of Eyewash Stations for Laboratory Use.
ERIC Educational Resources Information Center
Walters, Douglas B.; And Others
1988-01-01
Evaluates and compares common eyewash stations currently being used in laboratories. Discusses types available, installation, water supply needs, and maintenance. Lists current OSHA eyewash station standards. (ML)
Implementation guidelines for road weather information systems
DOT National Transportation Integrated Search
1997-11-01
The report presents guidelines for implementing road weather information systems (RWIS). These guidelines will assist highway agency personnel with the planning, installation, and maintenance of road weather information systems for either ice or high...
46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.
Code of Federal Regulations, 2013 CFR
2013-10-01
... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...
46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...
40 CFR 63.5998 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... POLLUTANTS FOR SOURCE CATEGORIES National Emissions Standards for Hazardous Air Pollutants: Rubber Tire Manufacturing Testing and Initial Compliance Requirements for Tire Cord Production Affected Sources § 63.5998...
Measure Guideline. Transitioning to a Tankless Water Heater
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brozyna, K.; Rapport, A.
2012-09-01
This measure guideline provides information to help residential builders and retrofitters with the design, specification, selection, implementation, installation, and maintenance issues of transitioning from tank-type water heaters to tankless water heaters.
STS-96 FD Highlights and Crew Activities Report: Flight Day 05
NASA Technical Reports Server (NTRS)
1999-01-01
On this fifth day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing logistics transfer activities within the Discovery/International Space Station orbiting complex. The crew transfers supplies, equipment, and water. Payette and Tokarev perform maintenance activities on the storage batteries in the Zarya module. Barry and Tokarev install acoustic insulation around some of the fans inside Zarya. Jernigan and Husband install shelving in 2 soft stowage racks. Husband and Barry troubleshoot and perform maintenance activities on the Early Communications System. At the end of the workday, Rominger, Jernigan, and Barry discussed the progress of the mission with NBC's "Today," CBS "This Morning," and CNN.
Geothermal Energy: Prospects and Problems
ERIC Educational Resources Information Center
Ritter, William W.
1973-01-01
An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)
2016-09-01
Some technologies that were not included in the analysis (due to site-level evaluations), but could be added in the future, include: wind turbines ...number of entities involved in the procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is...difficult to obtain. The DPW is often understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The
Calibration of LOFAR data on the cloud
NASA Astrophysics Data System (ADS)
Sabater, J.; Sánchez-Expósito, S.; Best, P.; Garrido, J.; Verdes-Montenegro, L.; Lezzi, D.
2017-04-01
New scientific instruments are starting to generate an unprecedented amount of data. The Low Frequency Array (LOFAR), one of the Square Kilometre Array (SKA) pathfinders, is already producing data on a petabyte scale. The calibration of these data presents a huge challenge for final users: (a) extensive storage and computing resources are required; (b) the installation and maintenance of the software required for the processing is not trivial; and (c) the requirements of calibration pipelines, which are experimental and under development, are quickly evolving. After encountering some limitations in classical infrastructures like dedicated clusters, we investigated the viability of cloud infrastructures as a solution. We found that the installation and operation of LOFAR data calibration pipelines is not only possible, but can also be efficient in cloud infrastructures. The main advantages were: (1) the ease of software installation and maintenance, and the availability of standard APIs and tools, widely used in the industry; this reduces the requirement for significant manual intervention, which can have a highly negative impact in some infrastructures; (2) the flexibility to adapt the infrastructure to the needs of the problem, especially as those demands change over time; (3) the on-demand consumption of (shared) resources. We found that a critical factor (also in other infrastructures) is the availability of scratch storage areas of an appropriate size. We found no significant impediments associated with the speed of data transfer, the use of virtualization, the use of external block storage, or the memory available (provided a minimum threshold is reached). Finally, we considered the cost-effectiveness of a commercial cloud like Amazon Web Services. While a cloud solution is more expensive than the operation of a large, fully-utilized cluster completely dedicated to LOFAR data reduction, we found that its costs are competitive if the number of datasets to be analysed is not high, or if the costs of maintaining a system capable of calibrating LOFAR data become high. Coupled with the advantages discussed above, this suggests that a cloud infrastructure may be favourable for many users.
Implementation of the National Intelligent Transportation Systems Program : 1996 report to Congress
DOT National Transportation Integrated Search
2003-01-01
This pocket guide is intended for use by state and local transportation officials, manufacturing and engineering organizations, university transportation professionals, and others responsible for the design, selection, installation, and maintenance o...
Cushing, M
1994-01-01
If you want to control your own computer installation, get the satisfaction of doing your own maintenance, and compensate for an inept or uninformed vendor, the information in this article will help you achieve these ends. Good luck and good cabling!
40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... galvanic corrosion. (c) For each integrating regeneration stream flow monitoring device associated with a... recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any...
Evaluation of Vehicle Detection Systems for Traffic Signal Operations
DOT National Transportation Integrated Search
2016-10-16
Typical vehicle detection systems used in traffic signal operations are comprised of inductive loop detectors. Because of costs, installation challenges, and operation and maintenance issues, many alternative non-intrusive systems have been dev...
2011-02-28
ISS026-E-030864 (28 Feb. 2011) --- NASA astronauts Steve Bowen (foreground) and Alvin Drew, both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030930 (28 Feb. 2011) --- NASA astronaut Alvin Drew, STS-133 mission specialist, participates in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Drew and NASA astronaut Steve Bowen (out of frame), mission specialist, installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030929 (28 Feb. 2011) --- NASA astronaut Alvin Drew, STS-133 mission specialist, participates in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Drew and NASA astronaut Steve Bowen (out of frame), mission specialist, installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030716 (28 Feb. 2011) --- NASA astronauts Steve Bowen (foreground) and Alvin Drew, both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030715 (28 Feb. 2011) --- NASA astronauts Steve Bowen and Alvin Drew (mostly obscured at center right), both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030869 (28 Feb. 2011) --- NASA astronaut Steve Bowen, STS-133 mission specialist, participates in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and NASA astronaut Alvin Drew (out of frame), mission specialist, installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030865 (28 Feb. 2011) --- NASA astronauts Steve Bowen and Alvin Drew (mostly obscured at center right), both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030710 (28 Feb. 2011) --- NASA astronauts Steve Bowen and Alvin Drew (mostly obscured at center), both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
2011-02-28
ISS026-E-030711 (28 Feb. 2011) --- NASA astronauts Steve Bowen and Alvin Drew (partially obscured at center), both STS-133 mission specialists, participate in the mission?s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese ?Message in a Bottle? experiment to space.
Solar heating system installed at Stamford, Connecticut
NASA Technical Reports Server (NTRS)
1979-01-01
The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.
Summary Article: IEA HPP Annex 36: Quality Installation / Quality Maintenance Sensitivity Studies
Hourahan, Glenn; Domanski, Piotr; Baxter, Van D.
2015-01-30
The outcome from this Annex activity clearly identifies that poorly designed, installed, and/or maintained heat pumps operate inefficiently and waste considerable energy compared to their as-designed potential. Additionally, it is clear that small faults for a given field-observed practice are significant, that some attribute deviations (in various equipment applications and geographical locations) have a larger impact than others, and that multiple faults or deviations have a cumulative impact on heat pump performance.
Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meador, Richard J.; Hatley, Darrel D.
2004-03-18
Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less
Detection of structural deterioration and associated airline maintenance problems
NASA Technical Reports Server (NTRS)
Henniker, H. D.; Mitchell, R. G.
1972-01-01
Airline operations involving the detection of structural deterioration and associated maintenance problems are discussed. The standard approach to the maintenance and inspection of aircraft components and systems is described. The frequency of inspections and the application of preventive maintenance practices are examined. The types of failure which airline transport aircraft encounter and the steps taken to prevent catastrophic failure are reported.
Houngbo, P. Thierry; De Cock Buning, Tjard; Bunders, Joske; Coleman, Harry L. S.; Medenou, Daton; Dakpanon, Laurent; Zweekhorst, Marjolein
2017-01-01
Background: Low-income countries face many contextual challenges to manage healthcare technologies effectively, as the majority are imported and resources are constrained to a greater extent. Previous healthcare technology management (HTM) policies in Benin have failed to produce better quality of care for the population and costeffectiveness for the government. This study aims to identify and assess the main problems facing HTM in Benin’s public health sector, as well as the ability of key actors within the sector to address these problems. Methods: We conducted 2 surveys in 117 selected health facilities. The first survey was based on 377 questionnaires and 259 interviews, and the second involved observation and group interviews at health facilities. The Temple-Bird Healthcare Technology Package System (TBHTPS), tailored to the context of Benin’s health system, was used as a conceptual framework. Results: The findings of the first survey show that 85% of key actors in Benin’s HTM sector characterized the system as failing in components of the TBHTPS framework. Biomedical, clinical, healthcare technology engineers and technicians perceived problems most severely, followed by users of equipment, managers and hospital directors, international organization officers, local and foreign suppliers, and finally policy-makers, planners and administrators at the Ministry of Health (MoH). The 5 most important challenges to be addressed are policy, strategic management and planning, and technology needs assessment and selection – categorized as major enabling inputs (MEI) in HTM by the TBHTPS framework – and installation and commissioning, training and skill development and procurement, which are import and use activities (IUA). The ability of each key actor to address these problems (the degree of political or administrative power they possess) was inversely proportional to their perception of the severity of the problems. Observational data gathered during site visits described a different set of challenges including maintenance and repair, distribution, installation and commissioning, use and training and personnel skill development. Conclusion: The lack of experiential and technical knowledge in policy development processes could underpin many of the continuing problems in Benin’s HTM system. Before solutions can be devised to these problems, it is necessary to investigate their root causes, and which problems are most amenable to policy development. PMID:28949474
Engineering study of the module/array interface for large terrestrial photovoltaic arrays
NASA Technical Reports Server (NTRS)
1977-01-01
Three major areas--structural, electrical, and maintenance--were evaluated. Efforts in the structural area included establishing acceptance criteria for materials and members, determining loading criteria, and analyzing glass modules in various framing system configurations. Array support structure design was addressed briefly. Electrical considerations included evaluation of module characteristics, intermodule connectors, array wiring, converters and lightning protection. Plant maintenance features such as array cleaning, failure detection, and module installation and replacement were addressed.
1993-06-18
A unique identifying number assigned by the contracting officer that is a binding agreement between the Government and a Vendor. quantity- of -beds The...repair it; maintenance contracts may be costly. Barriers to Implementation • Requires the large amount of funding to link a significant number of ...and follow-on requirements for maintenance, training, and installation. 22. Cross Sharing of Standard Contract Shells A3 2.88 Al112 Local activities
1978-10-01
GRC used allocation methods to determine data for below installation level maintenance, supply, and transportation ; IDA focused on programmed... data systusm or for which some difficulty is expected in obtaining useful data . These areas are: * Below-depot maintenance, supply and transportation ...VAMOSC . . . . . . . . .65 B. Terminology . . . . . . . . . . . . 67 1C Dirferences Between the LRA and VAMOSC . .T8 D. Use of Existing Data Systems
Demonstration of variable speed permanent magnet generator at small, low-head hydro site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown Kinloch, David
Small hydro developers face a limited set of bad choices when choosing a generator for a small low-head hydro site. Direct drive synchronous generators are expensive and technically complex to install. Simpler induction generators are higher speed, requiring a speed increaser, which results in inefficiencies and maintenance problems. In addition, both induction and synchronous generators turn at a fixed speed, causing the turbine to run off its peak efficiency curve whenever the available head is different than the designed optimum head.The solution to these problems is the variable speed Permanent Magnet Generators (PMG). At the Weisenberger Mill in Midway, KY,more » a variable speed Permanent Magnet Generator has been installed and demonstrated. This new PMG system replaced an existing induction generator that had a HTD belt drive speed increaser system. Data was taken from the old generator before it was removed and compared to data collected after the PMG system was installed. The new variable speed PMG system is calculated to produce over 96% more energy than the old induction generator system during an average year. This significant increase was primarily due to the PMG generator operating at the correct speed at the maximum head, and the ability for the PMG generator to reduce its speed to lower optimum speeds as the stream flow increased and the net head decreased.This demonstration showed the importance of being able to adjust the speed of fixed blade turbines. All fixed blade turbines with varying net heads could achieve higher efficiencies if the speed can be matched to the optimum speed as the head changes. In addition, this demonstration showed that there are many potential efficiencies that could be realized with variable speed technology at hydro sites where mismatched turbine and generator speeds result in lower power output, even at maximum head. Funding for this project came from the US Dept. of Energy, through Award Number DE-EE0005429.« less
[Decontamination of dental unit waterlines using disinfectants and filters].
Monarca, S; Garusi, G; Gigola, P; Spampinato, L; Zani, C; Sapelli, P L
2002-10-01
Bacterial contamination of the dental unit water system can become a health problem for patients, particularly if they are immunodepressed. The present study has had the purpose of evaluating the effectiveness of methods of chemical decontamination using different disinfectants (peracetic acid, hydrogen peroxide, silver salts, chloramine T, glutaraldehyde T4) and methods of physical decontamination using synthetic membranes for the filtration of water. A preliminary removal procedure of the biofilm present in the waterline has been followed in a dental unit prepared on purpose for the research; subsequently different 2-week long maintenance procedures were applied using disinfectants injected by a pump and finally the bacterial contamination of the water flowing from the waterline was evaluated. The physical decontamination was performed using 0.22 mm membrane filters, which have been installed also in another dental unit, and the filtered water was analyzed to detect bacterial contamination. The preliminary procedure of biofilm removal succeeded obtaining germ-free water. Among the disinfectants used for the maintenance of the water quality only glutaraldehyde T4 was able to reduce the bacterial contamination under the limit suggested by the ADA. The membrane filter system was not able to purify the water, but when a disinfectant (peracetic acid) was used in the last part of the waterline good results were obtained. At present no decontamination system of dental waterline is available, and glutaraldehyde T4 seems to be the best disinfectant only if integrated with periodic biofilm removal for the maintenance of the water quality.
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... installed as set forth in the watershed or RC&D measure plan. (d) Compliance with the time frames and O&M... the schedule for withdrawal of water in water impounding structures as specified in the watershed or...
7 CFR 654.15 - Operation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... installed as set forth in the watershed or RC&D measure plan. (d) Compliance with the time frames and O&M... the schedule for withdrawal of water in water impounding structures as specified in the watershed or...
40 CFR 1045.130 - What installation instructions must I give to vessel manufacturers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... engine's emission control information label hard to read during normal engine maintenance, you must place... equivalent format. For example, you may post instructions on a publicly available Web site for downloading or...
40 CFR 1054.130 - What installation instructions must I give to equipment manufacturers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... makes the engine's emission control information label hard to read during normal engine maintenance, you... in an equivalent format. For example, you may post instructions on a publicly available Web site for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Continuous Compliance... each by-product hydrogen stream, end box ventilation system vent, and mercury thermal recovery unit...
15 CFR 801.9 - Reports required.
Code of Federal Regulations, 2011 CFR
2011-01-01
...); industrial engineering services; industrial-type maintenance, installation, alteration, and training services... services; educational and training services; engineering, architectural, and surveying services; financial... assets covered by the BE-125 survey are rights related to: Industrial processes and products; books...
15 CFR 801.9 - Reports required.
Code of Federal Regulations, 2010 CFR
2010-01-01
...); industrial engineering services; industrial-type maintenance, installation, alteration, and training services... services; educational and training services; engineering, architectural, and surveying services; financial... assets covered by the BE-125 survey are rights related to: Industrial processes and products; books...
15 CFR 801.9 - Reports required.
Code of Federal Regulations, 2012 CFR
2012-01-01
...); industrial engineering services; industrial-type maintenance, installation, alteration, and training services... services; educational and training services; engineering, architectural, and surveying services; financial... assets covered by the BE-125 survey are rights related to: Industrial processes and products; books...
Phase I development of an aesthetic, precast concrete bridge rail.
DOT National Transportation Integrated Search
2012-02-01
Precast concrete bridge rail systems offer several advantages over traditional cast-in-place rail designs, including reduced construction : time and costs, installation in a wide range of environmental conditions, easier maintenance and repair, impro...
Evaluation of Chem-Crete : final report.
DOT National Transportation Integrated Search
1982-01-01
Two test sections, one on new construction and the other on a maintenance resurfacing project, were installed in the fall of 1980 to evaluate the proprietary product Chem-Crete. Laboratory tests and dynaflect and density measurements were performed o...
Recycled plastics in highway construction and maintenance : final report.
DOT National Transportation Integrated Search
1997-07-01
Installation and serviceability were examined for several products manufactured, in part, from recycled products. The following recommendations were reached: : The type of recycled plastic snow pole employed in this study is not recommended for gener...
GATEWAY Demonstrations: Long-Term Evaluation of SSL Field Performance in Select Interior Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Tess E.; Davis, Robert G.; Wilkerson, Andrea M.
The GATEWAY program evaluated the long-term performance characteristics (chromaticity change, maintained illuminance, and operations and maintenance) of LED lighting systems in four field installations previously documented in separate DOE GATEWAY reports.
Weigh-in-Motion systems evaluation : final report.
DOT National Transportation Integrated Search
1976-04-01
This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...
Heating and Cooling from the Ground Up.
ERIC Educational Resources Information Center
Jackson, Lisa M.
1998-01-01
Explains why converting to geothermal heating and cooling is a good option when constructing or retrofitting schools. Reasons discussed include competitive installation costs, lower operating and maintenance costs, greater building-design flexibility, and greater user satisfaction. (GR)
47 CFR 54.639 - Ineligible expenses.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., including the following: i. Computers, including servers, and related hardware (e.g., printers, scanners, laptops), unless used exclusively for network management, maintenance, or other network operations; ii... installation/construction; marketing studies, marketing activities, or outreach to potential network members...
47 CFR 54.639 - Ineligible expenses.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., including the following: i. Computers, including servers, and related hardware (e.g., printers, scanners, laptops), unless used exclusively for network management, maintenance, or other network operations; ii... installation/construction; marketing studies, marketing activities, or outreach to potential network members...
Surface Infiltration Rates of Permeable Surfaces: Six Month ...
At the end of October 2009, EPA opened a parking lot on the Edison Environmental Center that included three parking rows of permeable pavement. The construction was a cooperative effort among EPA’s Office of Administration and Resources Management, National Risk Management Research Laboratory, and the facility owner, Region 2. The lot serves as an active parking area for facility staff and visitors and also as a research platform. Key unknowns in the application of green infrastructure include the long term performance and the maintenance requirements. The perceived uncertainty in these is a barrier to widespread adoption of the installation of permeable surfaces for stormwater management. EPA recognizes the need for credible long-term performance maintenance data and has begun a long-term monitoring effort on this installation. This document outlines the methods and results of the surface infiltration monitoring of the permeable parking surfaces during the first six months of operation. To inform the public.
Sensor4PRI: A Sensor Platform for the Protection of Railway Infrastructures
Cañete, Eduardo; Chen, Jaime; Díaz, Manuel; Llopis, Luis; Rubio, Bartolomé
2015-01-01
Wireless Sensor Networks constitute pervasive and distributed computing systems and are potentially one of the most important technologies of this century. They have been specifically identified as a good candidate to become an integral part of the protection of critical infrastructures. In this paper we focus on railway infrastructure protection and we present the details of a sensor platform designed to be integrated into a slab track system in order to carry out both installation and maintenance monitoring activities. In the installation phase, the platform helps operators to install the slab tracks in the right position. In the maintenance phase, the platform collects information about the structural health and behavior of the infrastructure when a train travels along it and relays the readings to a base station. The base station uses trains as data mules to upload the information to the internet. The use of a train as a data mule is especially suitable for collecting information from remote or inaccessible places which do not have a direct connection to the internet and require less network infrastructure. The overall aim of the system is to deploy a permanent economically viable monitoring system to improve the safety of railway infrastructures. PMID:25734648
Extending permanent volcano monitoring networks into Iceland's ice caps
NASA Astrophysics Data System (ADS)
Vogfjörd, Kristín S.; Bergsson, Bergur H.; Kjartansson, Vilhjálmur; Jónsson, Thorsteinn; Ófeigsson, Benedikt G.; Roberts, Matthew J.; Jóhannesson, Tómas; Pálsson, Finnur; Magnússon, Eyjólfur; Erlendsson, Pálmi; Ingvarsson, Thorgils; Pálssson, Sighvatur K.
2015-04-01
The goals of the FUTUREVOLC project are the establishment of a volcano Supersite in Iceland to enable access to volcanological data from the country's many volcanoes and the development of a multiparametric volcano monitoring and early warning system. However, the location of some of Iceland's most active volcanoes inside the country's largest ice cap, Vatnajökull, makes these goals difficult to achieve as it hinders access and proper monitoring of seismic and deformation signals from the volcanoes. To overcome these obstacles, one of the developments in the project involves experimenting with extending the permanent real-time networks into the ice cap, including installation of stations in the glacier ice. At the onset of the project, only one permanent seismic and GPS site existed within Vatnajökull, on the caldera rim of the Grímsvötn volcano. Two years into the project both seismic and GPS stations have been successfully installed and operated inside the glacier; on rock outcrops as well as on the glacier surface. The specific problems to overcome are (i) harsh weather conditions requiring sturdy and resilient equipment and site installations, (ii) darkness during winter months shutting down power generation for several weeks, (iii) high snow accumulation burying the instruments, solar panels and communication and GPS antennae, and in some locations (iv) extreme icing conditions blocking transmission signals and connection to GPS satellites, as well as excluding the possibility of power generation by wind generators. In 2013, two permanent seismic stations and one GPS station were installed on rock outcrops within the ice cap in locations with 3G connections and powered by solar panels and enough battery storage to sustain operation during the darkest winter months. These sites have successfully operated for over a year with mostly regular maintenance requirements, transmitting data in real-time to IMO for analysis. Preparations for two permanent seismic sites in the ice started in early 2014, with the installation of windmills, solar panels and web camera to monitor snow accumulation and icing. The site locations were constrained by the availability of communication and locations of ice-divides to avoid significant lateral motion of the stations. At the onset of the Bárdarbunga dyke intrusion in August 2014, these sites were temporarily instrumented and transmitted real-time seismic data, important for tracking the dyke intrusion. In late 2014, a specially designed vault was installed at one of the sites and a Güralp broadband glacier seismometer installed. Since 2013, three GPS stations powered by solar energy have been operated on the ice, to monitor the movement of the glacier during an expected subglacial flood, when accumulated melt water at the Eastern Skaftá cauldron sub-glacial geothermal area will drain. One of the sites, located in the depression above the subglacial lake to monitor the onset of the flood, transmits the data to a repeater just outside the depression, from where the signal is transmitted by 3G to IMO. Maintaining the transmission through the winter months has required considerable maintenance. The experience gained through this operation proved crucial for the successful installation and operation of a real-time transmitting GPS and strong motion seismometer inside the Bárdarbunga cauldron in October 2014 to monitor the ongoing caldera subsidence.
Behnken and Patrick during EVA-2
2010-02-14
ISS022-E-065714 (14 Feb. 2010) --- NASA astronauts Robert Behnken (right) and Nicholas Patrick, both STS-130 mission specialists, participate in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and Patrick connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065720 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065733 (14 Feb. 2010) --- NASA astronaut Nicholas Patrick, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Patrick and Robert Behnken (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065722 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065734 (14 Feb. 2010) --- NASA astronaut Nicholas Patrick, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Patrick and Robert Behnken (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065736 (14 Feb. 2010) --- NASA astronaut Nicholas Patrick, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Patrick and Robert Behnken (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065735 (14 Feb. 2010) --- NASA astronaut Nicholas Patrick, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Patrick and Robert Behnken (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
Behnken and Patrick during EVA-2
2010-02-14
ISS022-E-065710 (14 Feb. 2010) --- NASA astronauts Robert Behnken (right) and Nicholas Patrick, both STS-130 mission specialists, participate in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and Patrick connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
Behnken and Patrick during EVA-2
2010-02-14
ISS022-E-065725 (14 Feb. 2010) --- NASA astronauts Robert Behnken (right) and Nicholas Patrick, both STS-130 mission specialists, participate in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and Patrick connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
S130-E-007858 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission’s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065731 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065750 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065758 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
S130-E-007862 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission’s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
2010-02-14
ISS022-E-065751 (14 Feb. 2010) --- NASA astronaut Robert Behnken, STS-130 mission specialist, participates in the mission?s second session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the five-hour, 54-minute spacewalk, Behnken and astronaut Nicholas Patrick (out of frame), mission specialist, connected two ammonia coolant loops, installed thermal covers around the ammonia hoses, outfitted the Earth-facing port on the Tranquility node for the relocation of its Cupola, and installed handrails and a vent valve on the new module.
Current and emerging laser sensors for greenhouse gas sensing and leak detection
NASA Astrophysics Data System (ADS)
Frish, Michael B.
2014-05-01
To reduce atmospheric accumulation of the greenhouse gases methane and carbon dioxide, networks of continuously operating sensors that monitor and map their sources are desirable. In this paper, we discuss advances in laser-based open-path leak detectors, as well as technical and economic challenges inhibiting widespread sensor deployment for "ubiquitous monitoring". We describe permanently-installed, wireless, solar-powered sensors that overcome previous installation and maintenance difficulties while providing autonomous real-time leak reporting without false alarms.
Integrated Maintenance Information System (IMIS): A Maintenance Information Delivery Concept.
1987-11-01
InterFace Figure 2. Portable Maintenance Computer Concept. provide advice for difficult fault-isolation problems . The technician will be able to accomplish...faced with an ever-growing number of paper-based technical orders (TOs). This has greatly increased costs and distribution problems . In addition, it has...compounded problems associ- ated with ensuring accurate data and the lengthy correction times involved. To improve the accuracy of technical data and
NASA Astrophysics Data System (ADS)
Madding, Robert P.
1999-03-01
For years predictive maintenance thermographers have been challenged by industrial targets to determine whether they had a problem, and if they did how big was it. We have struggled with low emissivity and unknown emissivity targets. We have observed thermal patterns and temperatures and asked whether the target was operating normally or if the heat patterns indicated a problem condition. Through years of experience, we have built a body of knowledge. Conferences such as Thermosense are where we share that knowledge with others. From this, we realize that much more could be done if our targets were thermographer-friendly. Now it is time to ask the equipment manufacturers to step up to the plate and acknowledge the viability of thermography as a predictive maintenance and non-destructive test tool. They build the targets we look at. They can help us in a least three areas: (1) We need to work with them to specify a baseline thermal signature for their equipment operating under normal conditions. Thermograms would be included with the operating manual or equipment test results. Thermography would be part of acceptance and installation testing. (2) We need to ask them to include high emissivity coatings in their designs for certain targets. (3) We need to work with them to develop thermal models that will indicate thermal signatures under all types of environmental conditions for both normal and abnormal operation. Thermal modeling programs developed by the defense community that will display a surface thermal image are available for PCs. With the help of target equipment manufacturers, we can significantly advance the state-of-the- art of thermography applications. We can be even more confident of our recommendations. We can evaluate targets that couldn't be evaluated before, expanding our applications. We can have backup on criticality calls with manufacturers' data. In short, we can do our job better.
24 CFR 232.11 - Establishment and maintenance of long-term debt service reserve account.
Code of Federal Regulations, 2013 CFR
2013-04-01
... this part, and except with respect to Supplemental Loans to Finance Purchase and Installation of Fire Safety Equipment (subpart C of this part), if HUD determines the mortgage presents an atypical long-term...
24 CFR 232.11 - Establishment and maintenance of long-term debt service reserve account.
Code of Federal Regulations, 2014 CFR
2014-04-01
... this part, and except with respect to Supplemental Loans to Finance Purchase and Installation of Fire Safety Equipment (subpart C of this part), if HUD determines the mortgage presents an atypical long-term...
40 CFR 1039.130 - What installation instructions must I give to equipment manufacturers?
Code of Federal Regulations, 2010 CFR
2010-07-01
... information label hard to read during normal engine maintenance, you must place a duplicate label on the... own equipment. (d) Provide instructions in writing or in an equivalent format. For example, you may...
Selection of Electronic Resources.
ERIC Educational Resources Information Center
Weathers, Barbara
1998-01-01
Discusses the impact of electronic resources on collection development; selection of CD-ROMs, (platform, speed, video and sound, networking capability, installation and maintenance); selection of laser disks; and Internet evaluation (accuracy of content, authority, objectivity, currency, technical characteristics). Lists Web sites for evaluating…
Thermoplastic Single-Ply Roof Relieves Water Damage and Inconvenience.
ERIC Educational Resources Information Center
Williams, Jennifer Lynn
2002-01-01
Assesses use of thermoplastic single-ply roofs by North Carolina's Mars Hill College to prevent leaks, reduce maintenance costs, and enhance the value of their older historic buildings. Administrators comment on the roof's installation efficiency and cleanliness. (GR)
Evaluation of Revised Left Turn Signalization : Final Report
DOT National Transportation Integrated Search
1997-11-01
Modified left turn signals had shown cost savings over the old style of traffic signals in initial installation and maintenance. This evaluation was conducted to determine whether those savings would be justified by no increase in the accident rates ...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2012 CFR
2012-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2014 CFR
2014-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.
Code of Federal Regulations, 2013 CFR
2013-10-01
... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...
Utilization of available skills and materials in fire prevention
NASA Technical Reports Server (NTRS)
Martin, H. W.
1971-01-01
Procedures for installing fire protection systems in large buildings are discussed. Factors considered in the safety management are: (1) distribution of water supply, (2) design and location of exits, (3) emergency power system, and (4) maintenance procedures.
In-house fabrication of precast concrete bridge slabs.
DOT National Transportation Integrated Search
1976-01-01
Information is reported on the labor, equipment, material, and cost required for seven bridge maintenance situations in which state forces widened or replaced an existing short span structure. Precast concrete slabs were installed at three of the loc...
26 CFR 1.501(e)-1 - Cooperative hospital service organizations.
Code of Federal Regulations, 2014 CFR
2014-04-01
... illustrated by the following example. Example. An organization performs industrial engineering services on a...-hospitals), warehousing, billing and collection, food, clinical (including radiology), industrial engineering (including the installation, maintenance and repair of biomedical and similar equipment...
26 CFR 1.501(e)-1 - Cooperative hospital service organizations.
Code of Federal Regulations, 2013 CFR
2013-04-01
... illustrated by the following example. Example. An organization performs industrial engineering services on a...-hospitals), warehousing, billing and collection, food, clinical (including radiology), industrial engineering (including the installation, maintenance and repair of biomedical and similar equipment...
26 CFR 1.501(e)-1 - Cooperative hospital service organizations.
Code of Federal Regulations, 2012 CFR
2012-04-01
... illustrated by the following example. Example. An organization performs industrial engineering services on a...-hospitals), warehousing, billing and collection, food, clinical (including radiology), industrial engineering (including the installation, maintenance and repair of biomedical and similar equipment...
26 CFR 1.501(e)-1 - Cooperative hospital service organizations.
Code of Federal Regulations, 2011 CFR
2011-04-01
... illustrated by the following example. Example. An organization performs industrial engineering services on a...-hospitals), warehousing, billing and collection, food, clinical (including radiology), industrial engineering (including the installation, maintenance and repair of biomedical and similar equipment...
26 CFR 1.501(e)-1 - Cooperative hospital service organizations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... illustrated by the following example. Example. An organization performs industrial engineering services on a...-hospitals), warehousing, billing and collection, food, clinical (including radiology), industrial engineering (including the installation, maintenance and repair of biomedical and similar equipment...
Advance traffic control warning systems for maintenance operations : final report.
DOT National Transportation Integrated Search
1976-07-01
The report discusses the effect of certain variables defined by sign size, height of installation and legend on the driver responses as measured by speed, conflict and queuing parameters. Effects of electronically actuated, directional flashing signs...
40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... measure organic HAP emissions; and (iv) PS-15 of 40 CFR part 60, appendix B, for CEMS that use Fourier transform infrared spectroscopy to measure organic HAP emissions. (2) You must conduct a performance...
Code of Federal Regulations, 2010 CFR
2010-10-01
... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or facilities); (3) Routine legal, actuarial, auditing, and accounting services; and (4) Training services. [55...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Interlocking Rules and Instructions... derail and displaying an aspect indicating stop cannot be operated to display a less restrictive aspect...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tahvili, Sahar; Österberg, Jonas; Silvestrov, Sergei
One of the most important factors in the operations of many cooperations today is to maximize profit and one important tool to that effect is the optimization of maintenance activities. Maintenance activities is at the largest level divided into two major areas, corrective maintenance (CM) and preventive maintenance (PM). When optimizing maintenance activities, by a maintenance plan or policy, we seek to find the best activities to perform at each point in time, be it PM or CM. We explore the use of stochastic simulation, genetic algorithms and other tools for solving complex maintenance planning optimization problems in terms ofmore » a suggested framework model based on discrete event simulation.« less
2011-02-28
ISS026-E-030708 (28 Feb. 2011) --- NASA astronauts Steve Bowen and Alvin Drew (partially obscured at center right), both STS-133 mission specialists, participate in the mission’s first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 34-minute spacewalk, Bowen and Drew installed the J612 power extension cable, move a failed ammonia pump module to the External Stowage Platform 2 on the Quest Airlock for return to Earth at a later date, installed a camera wedge on the right hand truss segment, installed extensions to the mobile transporter rail and exposed the Japanese “Message in a Bottle” experiment to space.
Installation and service manual for the U.S. Geological Survey manometers
Craig, James D.
1983-01-01
The purpose of this manual is to describe the installation, operation, and maintenance of the bubble-gage manometers currently (1982) used by the U.S. Geological Survey. Other applications of these devices, such as the long manometer and differential manometer, are discussed, and accessories available for them are described. The bubble gage (water-stage manometer with gas-purge system) described in the Installation and Service Manual, October 1962, has been extensively modified and developed into the STACOM (stabilized and temperature compensated) device. This chapter is the manual for the STACOM unit and an update of the manual for the screw-type bubble gage. A parts list is included for both units.
Interim report : a non-overlay cathodic protection system.
DOT National Transportation Integrated Search
1983-01-01
This interim report describes Virginia's experience in installing its first cathodic protection system for a bridge deck. The installation was completed with practically no problems. Very minor problems have been encountered with the rectifier/contro...
Code of Federal Regulations, 2010 CFR
2010-10-01
... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.714 Cab. The compartment of a locomotive from which the propelling power and power brakes of the train are manually...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., single-break, signal control circuits using a grounded common, and alternating current power distribution... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR... General § 236.2 Grounds. Each circuit, the functioning of which affects the safety of train operations...
Code of Federal Regulations, 2011 CFR
2011-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide adequate access to and exposure of the engine compartment for preflight checks. (d) Each turbine engine...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide adequate access to and exposure of the engine compartment for preflight checks. (d) Each turbine engine...
Code of Federal Regulations, 2014 CFR
2014-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide adequate access to and exposure of the engine compartment for preflight checks. (d) Each turbine engine...
Code of Federal Regulations, 2013 CFR
2013-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide adequate access to and exposure of the engine compartment for preflight checks. (d) Each turbine engine...
Code of Federal Regulations, 2012 CFR
2012-01-01
... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide adequate access to and exposure of the engine compartment for preflight checks. (d) Each turbine engine...
Window-mounted auxiliary solar heater
NASA Technical Reports Server (NTRS)
Anthony, K. G.; Herndon, E. P.
1977-01-01
System uses hot-air collectors, no thermal storage, and fan with thermostat switches. At cost of heating efficiency, unit could be manufactured and sold at price allowing immediate entry to market as auxiliary heating system. Its simplicity allows homeowner installation, and maintenance is minimal.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., however, that where trolley phones and telephones are both used, an alternate source of power for the trolley phone system is not required. (d) Trolley phones connected to the trolley wire shall be grounded...
Lightweight solid decks for movable bridges - phase II.
DOT National Transportation Integrated Search
2016-01-01
Movable bridges often include open grid steel deck for its light weight and ease of installation. These decks, however, suffer from poor rideability and high maintenance costs. The primary objective of this research project was to search for a new ge...
Design data brochure: SIMS prototype system 2
NASA Technical Reports Server (NTRS)
1977-01-01
Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad. 236.787a Section 236.787a Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR...
The Vendors' Corner: Biblio-Techniques' Library and Information System (BLIS).
ERIC Educational Resources Information Center
Library Software Review, 1984
1984-01-01
Describes online catalog and integrated library computer system designed to enhance Washington Library Network's software. Highlights include system components; implementation options; system features (integrated library functions, database design, system management facilities); support services (installation and training, software maintenance and…
78 FR 37657 - Petition for Waiver of Compliance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... Division of the Regional Transportation Authority (Metra) and its operating company, the Northeast Illinois... CFR Part 236, Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance... each train operating in train stop, train control or cab signal territory; equipped. Specifically...
GATEWAY Report Brief: SSL Demonstration: Long-Term Evaluation of Indoor Field Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Report brief summarizing a GATEWAY program evaluation of the long-term performance characteristics (chromaticity change, maintained illuminance, and operations and maintenance) of LED lighting systems in four field installations previously documented in separate DOE GATEWAY reports.
A high school is supplied with solar energy--Dallas, Texas
NASA Technical Reports Server (NTRS)
1981-01-01
System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.
Western Michigan University Libraries' "Electronic Journal Finder"
ERIC Educational Resources Information Center
Gedeon, Randle; Boston, George
2005-01-01
This article describes the development of the "Electronic Journal Finder," a TDNet installation for the University Libraries of Western Michigan University. Topics covered include: rationale for subscription project timeline, content, product customization, set-up, maintenance issues, reporting functions, directing URL links, searching…
The Public School Infrastructure Problem: Deteriorating Buildings and Deferred Maintenance
ERIC Educational Resources Information Center
Hunter, Richard C.
2009-01-01
The deterioration of public school buildings is more prevalent in large cities that, because of funding shortfalls, have deferred maintenance and require huge sums to bring their buildings up to acceptable standards. Cities such as New York will require approximately $680 million to address the problem of deferred maintenance for needed painting,…
Measure Guideline: Heat Pump Water Heaters in New and Existing Homes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shapiro, C.; Puttagunta, S.; Owens, D.
2012-02-01
This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. This document is intended to explore the issues surrounding heat pump water heaters (HPWHs) to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Heat pump water heaters (HPWHs) promise to significantly reduce energy consumption for domestic hot water (DHW) over standard electric resistance water heaters (ERWHs). While ERWHs perform with energy factors (EFs) around 0.9, new HPWHs boast EFs upwards of 2.0. High energy factors in HPWHs are achieved by combining a vapor compression system, which extracts heat from themore » surrounding air at high efficiencies, with electric resistance element(s), which are better suited to meet large hot water demands. Swapping ERWHs with HPWHs could result in roughly 50% reduction in water heating energy consumption for 35.6% of all U.S. households. This Building America Measure Guideline is intended for builders, contractors, homeowners, and policy-makers. While HPWHs promise to significantly reduce energy use for DHW, proper installation, selection, and maintenance of HPWHs is required to ensure high operating efficiency and reliability. This document is intended to explore the issues surrounding HPWHs to ensure that homeowners and contractors have the tools needed to appropriately and efficiently install HPWHs. Section 1 of this guideline provides a brief description of HPWHs and their operation. Section 2 highlights the cost and energy savings of HPWHs as well as the variables that affect HPWH performance, reliability, and efficiency. Section 3 gives guidelines for proper installation and maintenance of HPWHs, selection criteria for locating HPWHs, and highlights of important differences between ERWH and HPWH installations. Throughout this document, CARB has included results from the evaluation of 14 heat pump water heaters (including three recently released HPWH products) installed in existing homes in the northeast region of the United States.« less
Structural analysis and evaluation of actual PC bridge using 950 keV/3.95 MeV X-band linacs
NASA Astrophysics Data System (ADS)
Takeuchi, H.; Yano, R.; Ozawa, I.; Mitsuya, Y.; Dobashi, K.; Uesaka, M.; Kusano, J.; Oshima, Y.; Ishida, M.
2017-07-01
In Japan, bridges constructed during the strong economic growth era are facing an aging problem and advanced maintenance methods have become strongly required recently. To meet this demand, we develop the on-site inspection system using 950 keV/3.95 MeV X-band (9.3 GHz) linac X-ray sources. These systems can visualize in seconds the inner states of bridges, including cracks of concrete, location and state of tendons (wires) and other imperfections. At the on-site inspections, 950 keV linac exhibited sufficient performance. But, for thicker concrete, it is difficult to visualize the internal state by 950 keV linac. Therefore, we proceeded the installation of 3.95 MeV linac for on-site bridge inspection. In addition, for accurate evaluation, verification on the parallel motion CT technique and FEM analysis are in progress.
Technology for Water Treatment
NASA Technical Reports Server (NTRS)
1992-01-01
There are approximately 500,000 water cooling towers in the United States, all of which must be kept clear of "scale" and corrosion and free of pollutants and bacteria. Electron Pure, Ltd. manufactures a hydro cooling tower conditioner as well as an automatic pool sanitizer. The pool sanitizer consists of two copper/silver electrodes placed in a chamber mounted in the pool's recirculation system. The tower conditioner combines the ionization system with a water conditioner, pump, centrifugal solids separator and timer. The system saves water, eliminates algae and operates maintenance and chemical free. The company has over 100 distributors in the U.S. as well as others in 20 foreign countries. The buildup of scale and corrosion is the most costly maintenance problem in cooling tower operation. Jet Propulsion Laboratory successfully developed a non-chemical system that not only curbed scale and corrosion, but also offered advantages in water conservation, cost savings and the elimination of toxic chemical discharge. In the system, ozone is produced by an on-site generator and introduced to the cooling tower water. Organic impurities are oxidized, and the dissolved ozone removes bacteria and scale. National Water Management, a NASA licensee, has installed its ozone advantage systems at some 200 cooling towers. Customers have saved money and eliminated chemical storage and discharge.
Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zeitzchel, G.; Tennie, M.; Saal, G.
In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps,more » agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... CURRENT GOOD MANUFACTURING PRACTICE FOR MEDICATED FEEDS Construction and Maintenance of Facilities and Equipment § 225.30 Equipment. (a) Equipment which is designed to perform its intended function and is properly installed and used is essential to the manufacture of medicated feeds. Such equipment permits...
49 CFR 236.923 - Task analysis and basic requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... classroom, simulator, computer-based, hands-on, or other formally structured training and testing, except... for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements...) Based on a formal task analysis, identify the installation, maintenance, repair, modification...
DOT National Transportation Integrated Search
2013-08-01
Across the Nation, many agencies have been replacing conventional incandescent light bulbs in traffic signals with light-emitting diodes (LED) (see figure 1 and figure 2). LEDs are primarily installed to reduce energy consumption and decrease mainten...
Comparison of permeable pavement types : hydrology, design, installation, maintenance and cost.
DOT National Transportation Integrated Search
2012-01-13
"WisDOTs regional storm water engineer for the Southeast Region is interested in developing a park-and-ride with : porous pavement, possibly with the PaveDrain brand of permeable block. Research was needed to determine how : well permeable pavemen...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
49 CFR 236.60 - Switch shunting circuit; use restricted.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...
Preventing Playground Injuries and Litigation.
ERIC Educational Resources Information Center
Frost, Joe L.
1994-01-01
The typical American playground is antiquated, hazardous, and inappropriate for the developmental needs of children. The paper explains how design, installation, maintenance, and supervision are critical in preventing playground injuries and resulting litigation, noting the importance of regular training for everyone who supervises children on the…
40 CFR 86.094-25 - Maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... sensors (including oxygen sensor if installed) and actuators. (D) Exhaust gas recirculation system..., and for 1985 and Later Model Year New Gasoline Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas... trucks and heavy-duty engines, the adjustment, cleaning, repair, or replacement of the oxygen sensor...
40 CFR 86.094-25 - Maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... sensors (including oxygen sensor if installed) and actuators. (D) Exhaust gas recirculation system..., and for 1985 and Later Model Year New Gasoline Fueled, Natural Gas-Fueled, Liquefied Petroleum Gas... trucks and heavy-duty engines, the adjustment, cleaning, repair, or replacement of the oxygen sensor...
30 CFR 57.4561 - Stationary diesel equipment underground.
Code of Federal Regulations, 2010 CFR
2010-07-01
....4561 Section 57.4561 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4561 Stationary diesel equipment...