32 CFR 202.1 - Purpose, scope, definitions, and applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...
32 CFR 202.1 - Purpose, scope, definitions, and applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This a continuation of the Installation Restoration Program, Site Investigation Report IRP Sites No. 1, No. 2 and No. 3 at the New York Air National Guard, Roslyn, New York. The soil boring logs are presented.
Installation Restoration Program. Confirmation/Quantification Stage 1. Phase 2
1985-03-07
INSTALLATION RESTORATION PROGRAM i0 PHASE II - CONFIRMATION/QUANTIFICATION 0STAGE 1 KIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117 IIl PREPARED BY SCIENCE...APPLICATIONS INTERNATIONAL CORPORATION 505 MARQUETTE NW, SUITE 1200 ALBUQUERQUE, NEW MEXICO 871021 5MARCH 1985 FINAL REPORT FROM FEB 1983 TO MAR 1985...QUANTIFICATION STAGE 1 i FINAL REPORT FOR IKIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117U HEADQUARTERS MILITARY AIRLIFT COMMAND COMMAND SURGEON’S OFFICE (HQ MAC
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is the continuation of the Installation Restoration Program Site Investigation report IRP Sites No. 1, No. 2, and No. 3 at the Air National Guard, Roslyn, New York. The chemical analyses results for soil and ground water samples is reported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wittpenn, Nancy A.
2004-07-09
This project proposes to restore tidal connection between the Columbia River Estuary and Blind Slough through the replacement and/or installation of culverts, installation of water control devices, breaching of dikes, and channel enhancement. These enhancements would restore connectivity to approximately ten (10) miles of slough channels previously isolated from tidal influence due to dikes, road crossings, and constrained culverts.
1988-11-01
revri if necenary and iIenitif by block number) FIELO GROUP SUS-GROUP Installation Restoration Program , Groundwater ,P& Soils. Surface water ...qoulkhave been affected by the Site 3 flight line storm drainage outfall. Groundwater quali y samples were collected from the Site 4 water supply well No...monitoring. o Groundwater from the Site 4 water well No. 10 contains no VOCs. Because it remains unclear whether levels of THMs previously measured
1992-08-07
AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is a continuation of the Installation Restoration Program site investigation report for IRP Sites No. 1, No. 2 and No. 3 at the Air National Guard, Rosyln, New York. The Sample Delivery Group (SDG) narratives and quality assurance/quality control analytical results of eighteen samples are reported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nashold, B.; Rosenblatt, D.; Hau, J.
This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations.« less
Installation Restoration Program. Phase 1 - Records Search, Elmendorf AFB, Alaska
1983-09-01
Installation Restoration Hazardous Waste Management Past Solid Waste Disposal Sites Ground Water Contamination 26. ABSTRACT (CO- ffew. - reev. ilde It necessar...Activity Review 4-1 Industrial Operations (Shops) 4-2 Fire Training 4-13 Fuels Management 4-15 Description of Past On-sane Disposal Methods 4-23 Waste...characteristics, potential for contaminant migration and waste management practices. The details of the rating procedure are presented in Appendix H and the
Information Management for Installation Restoration with Focus on Aberdeen Proving Ground, Maryland
1993-08-01
savings. Edgewood Area Project Background EA has been the site of extensive military munitions testing and disposal for over 70 years. Onsite burial of...titled "Installation Restoration Data Manage- ment Information System" (IRDMIS). This program, begun in 1975, has undergone several updates as technology ...collocated with AEC on EA, Maryland. Data from geotechnical chemical analysis and field survey results are supplied by AEC-authorized contractors and
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What are my requirements to acquire, install, operate, and maintain real and personal property? 86.70 Section 86.70 Wildlife and Fisheries...-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Manage Grants...
1980-11-20
PROGRAMS TO CONTROL ENVIRONMENTAL CONTAMINATION FROM PAST ACTIVITIES. * THEN, I WILL PRESENT OUR MAJOR PROGRAM TO IMtPLEMENT WITHIN THE DEPARTMENT OF...OF DOD’S HAZARDOUS WASTE DISPOSAL PROGRAM AND OUR PROGRAM TO ABATE MIGRATION OF CONTAMINANTS FROM DEFENSE INSTALLATIONS. THE INTENSE QUESTIONS FROM THE...INDUSTRY AND MOST OF THE GOVERNMENT. SINCE 1975, DEFENSE HAS HAD ITS INSTALLATION RESTORATION PROGRAM TO ASSESS AND CONTROL ANY POSSIBLE MIGRATION OF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, W.J.; Liddle, S.K.
1986-09-01
The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less
Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa
1983-09-01
installation. Low-lying drainageways on the site are underlain by soils of the Gravity series and of the Wabash -Gravity-Nodaway complex. These soils...Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- -- ’ cadmium batteries (24/year) and sulfuric
1991-05-01
FEASIBILITY STUDIES (RI/FS) ENVIRONMENTAL RESTORATION DIV STAFF MAY 1991 (REPRINT) - Distribution is unlimited; approved for public release ENVIRONMENTAL ...RESTORATION DIVISION (ESR) ENVIRONMENTAL SERVICES OFFICE AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE (AFCEE) BROOKS AIR FORCE BASE, TEXAS S(4 93-05296...Human Systems Division’s Human Systems Program Office, IRP Divisicn (HSD/YAQ) was transferred to the newly formed Air Force Center for Environmental
1984-05-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...CHESTER PH MAY 84 UNCLASSIFIED F336 iS-80-D-4-86 F/G 5/ 1 NL I l/hlhh..E/hhE mhh~hhElhElhhI mhhmhmmhhmhl Iflf lllflflflflfllfl mhhhhhmhhmmhhu Llw 111112...w1L 1 6 MICROCOPY RESOLUTION TEST CHART NATIONIAL BUREAU OF STANDARDS- 1963-A Installation Restoration Proaram AD-A 145 352 * Final Report Phase 11
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Do I need to conduct a survey if I already have a plan for installing tie-up facilities? 86.114 Section 86.114 Wildlife and Fisheries UNITED... SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Will Complete...
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... reports include, but are not limited to: (i) Installation restoration program site studies, engineering documents, such as site inspections, remedial investigations, feasibility studies, engineering evaluation...
Wide area restoration following biological contamination
NASA Astrophysics Data System (ADS)
Yang, Lynn; Hibbard, Wilthea; Edwards, Donna; Franco, David; Fruetel, Julie; Tucker, Mark; Einfeld, Wayne; Knowlton, Robert; Brown, Gary; Brockmann, John; Greenwalt, Robert; Miles, Robin; Raber, Ellen; Carlsen, Tina; Krauter, Paula; Dillon, Michael; MacQueen, Don; Intrepido, Tony; Hoppes, Bill; Wilson, Wendy; Mancieri, Sav
2008-04-01
Current understanding of how to restore a wide area that has been contaminated following a large biological attack is limited. The Department of Homeland Security and Department of Defense are executing a four-year collaborative program named the Interagency Biological Restoration Demonstration (IBRD) program. This program is aimed at developing technologies, methods, plans and policies necessary to restore a wide area, including military installations and critical infrastructures, in the event of a large outdoor aerosol release of anthrax. The IBRD program partner pilot city is the Seattle Urban Area to include Fort Lewis, WA and McChord Air Force Base. A front-end systems analysis was conducted as part of IBRD, to: 1) assess existing technologies and processes for wide area restoration; from this, 2) develop an "as-is" decision framework for wide area restoration; and 3) identify and prioritize capability gaps. Qualitative assessments and quantitative analyses, including sensitivity, timeline and case study analyses, were conducted to evaluate existing processes and rank capability gaps. This paper describes the approach and results from this front-end systems analysis.
Installation Restoration Program Records Search for Kingsley Field, Oregon.
1982-06-01
Hazardous Assesment Rating Methodology (HARM), is now used for all Air Force IRP studies. To maintain consistency, AFESC had their on-call contractors review...Installation History D. Industrial Facilities E. POL Storage Tanks F. Abandoned Tanks G. Oil/Water Separators :" H. Site Hazard Rating Methodology I. Site...and implementing regulations. The pur- pose of DOD policy is to control the migration of hazardous material contaminants from DOD installations. 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-18
The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.
1985-06-28
1984 to April 1985 includedr installation of 27 raw mnitor wells and 11 amh l’,(1 zjit~s, collecticn cf seive~t, sarples ftw surfac , soil, shallowv...modifying a sampling and analytical program that addresses the requirements of the project. If project requirements necessitate different quality...reagent blank and at least five (5) different concentrations of thl analyte. A modification of the method of Hubaux and Vos will be used to deter
Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Hilaire, Danny R.
This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and,more » more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nashold, B.; Rosenblatt, D.; Hau, J.
1995-08-01
This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations. This volume consists of appendices F-Q, which contain the analytical data from the site characterization.« less
76 FR 12629 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... maintenance program by incorporating Task 320100-211 (repetitive detailed inspections of the retraction... installation, and corrosion) and Task 320100-212 (repetitive restorations of the retraction actuator for...
Installation Restoration Program Management Plan
1999-03-01
Proving Ground Dugway Proving Ground White Sands Missile Range Yuma Proving Ground Aviation Missile Command Redstone Arsenal Letterkenny Army Depot...approved for Public Release DUC QUALITY INSPECTED 3 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND ...environmental documents. The TIC is located at the USAEC at Aberdeen Proving Ground , MD. If an installation or MACOM/MSC is not aware of
Installation-Restoration Program Preliminary Assessment, Naknek Recreational Camps, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-04-01
The Hazardous Materials Technical Center (HMTC) was retained in January 1988 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment of Naknek Recreational Camps, Alaska, DoD policy is to identify and fully evaluate suspected problems associated with past hazardous-material disposal sites on DoD facilities, control the migration of hazardous contamination from such facilities, and control hazards to health and welfare that may have resulted from these past operations. Past installation operations involved the use and disposal of materials and wastes that were subsequently categorized as hazardous. The major operations of Naknek Camp I and Camp II did not use or disposemore » of HM/HW; however, these camps were used by the Air Force as dump areas and landfills. Waste oils, fuels, and polychlorinated biphenyls (PCBs) were among the wastes disposed of during these dumping activities. Information obtained through interviews, records, and field observations resulted in the identification of three sites that are potentially contaminated with HM/HW. At each of the identified sites, the potential exists for contamination of surface water, soils, and/or ground water and subsequent contaminant migration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report presents the results of the Site Investigation (SI) conducted at IRP Sites No. 1, No. 2, and No. 3 at the 106th Civil Engineering Flight (CEF) located at Roslyn Air National Guard Station (ANGS), Roslyn, Long Island, New York. A Preliminary Assessment (PA) (AD-A238 847) of the 106th CEF resulted in the identification of two potentially contaminated waste holding areas and a waste sludge application site. These sites were identified as IRP Site No. 1 (Access Road to Aerospace Ground Equipment `AGE` Shop), IRP Site No. 2 (Old Waste Holding Area No. 1), and IRP Site No. 3more » (Old Waste Holding Area No. 2) and recommended for further investigation under the Installation Restoration Program (IRP).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-11-01
The Hazardous Materials Technical Center (HMTC) was retained in May 1986 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment (PA) - Records Search for the 155th Tactical Reconnaissance Group (TRG), Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska (hereinafter referred to as the Base). The Records Search included: an onsite visit including interviews with 19 Base personnel conducted by HMTC personnel on 21-23 May 1986; the acquisition and analysis of pertinent information and records on hazardous materials use and hazardous-waste generation and disposal at the Base; the acquisition and analysis of available geologic, hydrologic, meteorologic, and environmental data frommore » pertinent Federal, State, and local agencies; and the identification of sites on the Base that may be potentially contaminated with hazardous materials/hazardous wastes (HM/HW).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document, a Record of Decision (ROD), presents the selected remedial action for the AC W Site, Installation Restoration Program (IRP) Site 12, at Mather Air Force Base (AFB), Sacramento County, California. Reports indicate that from 1958 to 1966 waste solvents and transformer oils were disposed in a waste disposal pipe in the AC W area. Investigations conducted as part of the Air Force Installation Restoration Program (IRP) failed to locate the waste disposal pipe but did find trichloroethylene (TCE) contamination in the shallow water bearing zone (SWBZ) in the AC W area. The SWBZ is classified as amore » potential source of drinking water by the State of California, although it is not currently used in the AC W area. The selected remedy will address the potential threat to human health posed by TCE contamination in groundwater (primarily in the SWBZ).« less
Quantification of Uncertainty in the Remedial Investigation/Feasibility Studies Process
1993-09-01
Environmental Restoration Division, HQ Air Combat Command at Langley AFB . Without his support this thesis would not have been possible. Through his...Lester, Restoration Program Manager, Wright-Patterson AFB , stated that the Operable Units (OUs) at Wright- Patterson AFB were regrouped (sites moved...provided detailed information on each installation’s sites and OUs and how they were related. For example, the MAP for Hamilton AFB might describe how
Installation Restoration Program. Phase 1 - Records Search, Robins AFB, Georgia.
1982-04-01
Installations U under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980. PURPOSE AND SCOPE OF THE... Liability Act of 1980 (CERCLA). A potentially hazardous waste is one which is suspected of being hazardous although insufficient data are available to...comprised of a concrete vault buried approximately six feet below the ground surface. 4 A locked chain -linked fence with two barbed wire strands surrounds
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, C.
This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.« less
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2014 CFR
2014-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2013 CFR
2013-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
Installation Restoration Program Preliminary Assessment Granite Mountain Radio Relay Station, Alaska
1989-04-01
the mountain. Within the vicinity of Granite Mountain Pluton, these rocks are characteristically hornfelsic and propylitically altered to a hard, pale...uncorrupted; unspoiled. PROPYLITICAL - Pertaining to or resembling propylite , a hydrothermally altered andestic. PYROXENE - A group of dark rock-forming
Installation Restoration Program. Phase 1. Records Search 15th ABW Satellite Installations, Hawaii
1984-09-01
Hickam POL Storage Facilities and Pipeline The POL storage facilities remotely located from Hickam Air Force Base (AFB...airfield with less activity than nearby Wheeler and Hickam Air Force Bases . Aircraft activity was significantly reduced in the late 1940’s and the...United States Air Force to conduct the Phase I Records Search at the 15th Air Base Wing 1-2 ES ENGINEERING-SCIENCE PHASE I PHASE 11 PHASE IV
2006-03-01
2003 Air Emission Inventory, July 2004. o The generators are assumed to be diesel-fired and have a horsepower rating of less than 600 hp. o...In July 2003, the 460th LRS purchased and installed an automated movable storage system for mobility bag storage. This system eliminates wasted aisle...Installation Restoration Program Draft Final Engineering Evaluation/Cost Analysis IRP Site 4. July . • URS Corporation (URS). 2003a. Buckley Air Force
Preliminary Assessment/Site Investigation: Tooele Army Depot, Utah. Volume 2. South Area
1988-12-29
Program until the period from 17 February to 5 March 1987. 1.3 OVERVIEV OF REPORT The remaining chapters of this report (Volume II) address the following...Engineering, Science, and Technology, Inc. for the purpose of aiding in the implementation of the U.S. Army Installation Restoration Program . The use of...NUMBERS PROGRAM PROJECT ITASK WORK UNIT ELEMENT NO. NO, NO. ACCESSION NO. __ __ __ __ __ __ _ _ __ __ __I___1___1_ 003 11 TITLE (Include Security
Letter from EPA's Assistant Administrator for Enforcement and Compliance Assurance expresses concern over Tyndall Air Force Base's August 19, 2010, Memorandum on Environmental Restoration Program Progress at Tyndall AFB, FL.
1984-01-01
from the north, thereby occasionally encouraging unseasonably warm temperatures. Unseasonably cold temperatures most often occur when the Bermuda...marl. Hawthorn 160 - Sandy phophatic marl and soft limestone with interbedded brittle -shale. 25 OLIGOCENE (Ta) Flint River 50 - Reddish-yellow sand
Installation Restoration Program Records Search for Alaska DEW Line Stations
1982-06-01
Chlorinate hydrocarbons Radar components Calgon corrosion inhibitor 55 gallon drums (empty) Lye Lime Corrosives Antifreeze Paper Wood Plastics AVGAS...Factor Subsoare A I Persistence Vcor * Subaccro a C. Appl~y "yicaJ. state =iLtipiisr Sub•coce 3 X Physical State Mltipler - Waste Caracteristics
1982-04-01
number) This report presents a review and evaluation of the available information on the use of physical and hydrological barriers for containment or...UNCLASSIFIED 1 $SCCuRITY CLASSIFICATION OF T.qiS *&GE When Daa Entered SUMMARY The available literature on methods for containment or diversion of ground...II. Preliminary Considerations for Installation of a Ground Water Containment or Diversion Barrier .. ... ....... ...... 13 III. Slurry-Trench Cutoff
Installation Restoration Program. Phase 1. Records Search, Charleston AFB, South Carolina
1983-10-01
and plastics plants. Conducted industrial waste surveys, landfill design, and planning for plant environmental protection programs; evaluated air...management study for a major plastics manufacturing company. Responsibilitites included identification and investigation of a number of operating...61 aste Caracteristics 68 Pathways 69 Total 198 divided by 3 = 63 3ross total sc,:re B. Aooly factor for waste containment from waste manaement
The Installation Restoration Program Toxicology Guide. Volume 5
1990-11-01
biological systems may not differentiate metals on a basis other than oxidation state. In essence , this results in a specific function (e.g. intracellular...biological exposure Indices. 5th ed. Cincinnati, Ohio, pp. 422-426 (as cited in 6206). 6368. Jasmin , G. 1973. Experimental production of polycythcmia in
This document reports on the results of bench-scale tests of treatment technologies for explosive-containing sediment located in lagoons at Army ammunition plants. A companion literature search identified the appropriate explosives remediation technologies to be evaluated. ...
Installation Restoration Program Records Search for Dobbins Air Force Base, Georgia
1982-04-01
migation Death to irond water ____________ lift ogaeiitation 1 . Subsurface flow_____I a _____________ Direct aess W 4round water______ j Submrs(10 x actr...potential pathways, surface water migation , flooding, and ground-water * migration. Select the highest rating, and proceed to C. f 1. Surface water migration
1981-11-01
Additional ferns, including Eaton lip fern, occur on shady granite outcroppings. Reveechon three-awn, Scribner needlegrass, noseburn, bear grass, banana ...torrey rush, and smooth monkey flower are among the more obvious plants in this area. Arroyos and seasonally intermittent streams support other
Installation Restoration Program. Phase 2. Confirmation McClellan AFB, California. Volume 1
1983-06-01
testing in accordance with ASTH C 828-78 and in conformance with CAL/ OSHA safety orders and ES Industrial Sewer Entry Procedures. Indi- viduals entering...Liquid Palm Cil Wastes," Proceedings: Asia Acuatech, Singapore, Malaysia , March 1980 (Coauthors R. White and C. Ponniah). "Surface Impoundment of
Installation Restoration Program. Phase I. Records Search. Vandenberg Air Force Base, California.
1984-12-01
acidity or alkalinity POL Petroleum, oils, and lubricants PVC Polyvinyl chloride plastic RCRA Resource Conservation and Recovery Act RP-1 Rocket propellant...multiplter: Subscore 3 K ?hvsical State ulriptier Waste Caracteristics Subscore 50 X 1 50 11-1. CS-I HAZARD ASSESSMENT RATING METHODOLOGY FORM (Continued
1988-12-01
and do not refer to monitoring zones at McClellSn AFB. b Priority poLutant metals analyses also included U.S. EPA Methods 206.2, 245.1 and 270.2. EW a...sampling protocol, and the laboratory is audited routinely. Therefore, no corrective action other than good training and supervision is necessary. The same
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1988
1989-03-01
63 6 1 17 36 IOWA 3 49 49 0 3 7 0 0 1 5 IDAHO 15 34 34 0 2 10 0 0 1 5 ILLINOIS 14 140 131 6 12 34 1 1 10 15 INDIANA 12 122 119 0 4 39 3 0 3 7 KANSAS 8...4 4 IOWA TOTALS 49 0 3 7 0 0 1 5 IDAHO ARMY ARCO AEC SITE 1 BONNEVILLE 1 BROKEN KETTLE TRAINING AREA 1 BUHL 1 GOODING I GOWEN FIELD 1 HALLEY 1 IDAHO ... IDAHO TOTALS 34 0 2 10 0 0 1 5 B- 13 Table B-2 DEPARTMENT OF DEFENSE ENVIRONMENTAL RESTORATION PROGRAM State by State Installation Status Listing (As
1985-01-01
a pavillion with a snack bar, six cabins, eight recreational vehicle camping sites with electrical -- hookup only, a covered picnic area, and a small...solidification. Lava: The material extruded by a volcano which consists of molten or part- molten silicate material. Leachate: A solution resulting from
Environmental Assessment for Renovation and Small Addition for AGE Facility MacDill AFB, Florida
2005-05-01
one lift station, all of the sanitary sewer lines have, in essence , at least one check valve to stop the inflow of floodwater to the WWTP. The...Force Base Installation Restoration Program 7621 Hillsborough Loop Dr. MacDill AFB, FL 33621-5207 Jasmine Raffington FL Coastal Management
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1
1986-03-28
Comftin,,,on Fvvem in.eea),a n dftl by bloe * numri ~A Problem Confirmation Study was conducted at Burlington Air National Guard BasE in Vermont. The...cont’d) 3. Characteristics(cont’d)- Biological Agent ( ) Volatile (4f Toxic (). Reactive ( ) 4. Toxicity: TLVs IDLHs 5. Special Hazards 6. Acute
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 3.
1988-02-05
EOCENE: Strata of the Tertiary era, between the Paleocene and Oligocene , lasting from 60 to 40 million years before the present. EPA: U.S. Environmental...for warm storage). The person who returns the sample will place his signature and date in the appropriate space on the check-out list. Sample Control
Installation Restoration Program. Phase 1: Records Search, Whiteman AFB, Missouri
1984-03-26
Aquazene (Ciba-Geigy) was added to each remote site lagoon (A-i through N-i) on a one-time basis as an algicide . Brine line leakage has been noted at...layered strata are inclined down and away from the axes. AQUAZENE: an algicide . ARRS: Aerospace Rescue and Recovery Squadron. ARTESIAN: Ground water
1984-11-01
FLOW CHART Complet List of Location/Shtes Evaluation of Past Operations at LUste SNMe * ~Potential Hazard to Healh WelareS Reglaor Agencon consolidat...siting studies were also a part of this tions, soil, groundwater sampling and large complex project. analysis, and remedial concept engi- neering. Project
Installation Restoration Program. Phase 1: Records Search, Pope Air Force Base, North Carolina
1985-05-01
Diazinon Calcium Cyanide A-Dust Pramitol 25E Mayforce Rodeo PZ 270 Dursban Fungicides Prograss PZ 250 Baygon Weed Hoe 108 Unicorn Fogging Solution Benlate...head; the direction in which ground water flows. I DPDO: Defense Property Disposal Office, previously included Redistri- bution and Marketing (R&M
Installation Restoration Program Records Search for Moody Air Force Base, Georgia.
1983-02-01
Mocap, and Chlordane ( termite control only). Ochemcomp and anticoagulants are commonly used for rodent control. The major herbicides currently used are...buried in 10 55-gallon drums in 1971. A single pit was excavated about 6 to 8 feet deep, and the filled hole was capped with a clayey-sand mound to
1989-11-01
and/or spill sites on Department of Defense (DoD) installations, and " Control hazards to human health, welfare, and the environment that may have...Investigations do not indicate harmful levels of contamination and do not pose a significant threat to human health or the environment. The site does not warrant...Feasibility Study - Investigation confirms the presence of contamination that may pose a threat to human health and/or the environment, and some sort of
Installation Restoration Program. Phase I. Records Search, Grand Forks Air Force Base, North Dakota.
1985-04-01
and Liability Act . (CERCLA) of 1980, Executive Order 12316, and 40 CFR 300 Subpart F O* (National Oil and Hazardous Substances Contigency Plan...response action on USAF installations under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as...COMBAT ICBT, OPSRA1ON$ MAINI’IPAIICE MAKGIMEIE WPPloTn GROP OIEGRO UP FIOSPITAL, 441 SM)tsU SUPLY 14O SIC 2 SP 447 SM S o u R M I3 1 1 5 E EE2 TENANT
Method for in-situ restoration of plantinum resistance thermometer calibration
Carroll, Radford M.
1989-01-01
A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or strain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's.
Method for in-situ restoration of platinum resistance thermometer calibration
Carroll, R.M.
1987-10-23
A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or stain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's. 1 fig.
1988-10-01
TOTAL DISSOVLED SOLIDS 3523/017 1896 1918 --- 3538/024 2625 2567 --- IV. PETROLEUM HYDROCARBON DUPLICATE ANALYSIS WAS NOT DONE DUE TO INSUFFICIENT...Characterized existing hydrogeologic conditions, prepared hydrologic budgets, delineated productive aquifers, performed safe yield determinations , and...New Jersey to determine suitability for building construction. * Supervised soil borings program at large waste disposal facility in Model City, New
Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volkman, Jed
2005-12-01
In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reportingmore » period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.« less
1988-06-01
Mencer Mitzi S. Miller Dist J. W. Zolyniak Prepared by the Oak Ridge Gaseous Diffusion Plant Oak Ridge, Tennessee 37831 operated by MARTIN MARIETTA...Drop A20 S Oak Ridge, TN 37830 * Mailing Address for Regular Mail: Martin Marietta Energy Systems, Inc. P.O. Box 2003 Oak Ridge, TN 37831-7440 Mitzi
1986-03-01
Evaluation of Past Operations ] at Listed Sites Contamination Delee StesPotential for I De’ere tesI Migrationl S Potential for IOther N Environmental... Microbiology , New Orleans. Louisiana. March 1983. Effect of particles on degradation of bromobenzene in a simulated groundwater environment
1988-03-01
Cheyenne area is characterized by semi-arid conditions and large diurnal and annual temperature changes. The summers are generally warm with humidity...contaminants through pathways (groundwater, surface water, soil, and air). MIOCENE - An epoch of the upper Tertiary period, after the Oligocene and before the
1991-02-01
Department of Agriculture (USDA): Soil Conservation Service, February 1968). Houston County is characterized by a warm and humid climate that borders...Figur I..,1 PhUTogrpER Map. of theAre 111-2 3. EXPLANATION - Residuum -~ l Citronelle Formation Catahouia Sandstone Paynes Hammock 0 Oligocene
1993-09-01
Surface Area Contacted Per Event SB soil boring Sb Antimony SD sediment sample SDG Sample Delivery Group SDWA Safe Drinking Water Act Se Selenium sec second...and were laid out using a Brunton compass and measuring tape. The station locations were gridded at intervals of 25 feet. Measurements indicating the
1986-10-01
Kaskaskia to the southwest, the Embarras to the south and the Vermilion to the southeast. Surface flow from the Base is ultimately conveyed to the Wabash ...of this characterization showed that arsenic, cadmium , chromium, lead, mercury, selenium, and silver were all below detection limits. The only EP TOX
1988-10-01
previous directives and meoranda. Although the DOD IRP and the USEPA Superfund pr"gr ware essentially the sase, differences in the definition of progr...Midway and Wilcox inJ Mississimp, Bulletin 102, Mississippi Geologic Research Papers, Mississippi Geological, Ecnomic and Toporapic Survey, 1964. 16
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan
1989-08-30
QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific
1985-09-01
GM SILTY GRAVEL GP POORLY GRADED GRAVEL SM SILTY SAND SP POORLY GRADED SAND SW WELL GRADED SAND ML LOW PLASTICITY SILT SOURCE: INSTALLATION DOCUMENTS... plastic on the side toward th’e beach in an attempt to prevent migration of fuel. to the beach. During the site visit for this Phase I IRP study the...Force have included garbage, refuse, incinerator ash (since 1975), wood, metal, plastic and bulky - materials such as construction and demolition debris
Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.
This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less
Installation Restoration Program. Phase 1. Records Search, Pease AFB, New Hampshire
1984-01-01
Kevin Hopkins, RCRA Permits, 603/271-4622 4. New Hampshire Water Supply and Pollution Control Commission Industrial Waste Division Concord, New...LPapilatiou syed try s=u-aca waer ~ sply wi-:n3 n±il" _wY!s=*aof _________ T. Pow"",- sacrped byT qr-’dý-was SCW17 Sublectais kcup%==subacr
Installation Restoration Program Records Search for McClellan Air Force Base, California.
1981-07-01
waterweed (Elodea spp.), button snakeroot (Eryngium aristulatum), quillwort (Isoetes howellii), water purslane (Ludwigia palustris), pillwort...persicaria Curly dock Rumex crispus Portulacaceae Purslane family Red maids Calandrinia ciliata Miner’s lettuce Montia perfoliata Common purslane Portulaca...marine and continental sedimentary rock which contains saline or brackish water. These rocks are impermeable and form the bottom of the basin, with
1983-04-01
Honorary Fraternity Gamma Eta Chapter- Secretary A-12 JAMES F. BRAITHWAITE, P.E. QUALIFICATIONS SUIMIARY PRINCIPAL James Braithwaite is Executive Vice...X factor Score subtotaLd/aaius .Me aubtOtal .7 C. oigmast pathway mabe "cre. l t~ thi ghest sabfoe Valueoo a. S-1. 9 -2 at 0-3 aboe. pathaysSubeorv
1983-09-01
underlain by soils of the Gravity series and " of the Wabash -Gravity-Nodaway complex. These soils, primarily silty clay loams, are formed in fine...Electric Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- S cadmium batteries (24/year) and sulfuric
1990-07-01
Nitroaniline 4-Nitroaniline N-Nitroso-di-n-butylamine N-Nitrosopiperidine Pentachlorobenzene Pentachloronitrobenzene Phenacetin 2- Picoline Pronarnide 1,2,4,5... chromium . Cu: Chemical symbol for copper. 3 DARCY’S LAW: An equation describing the flow of fluids in porous media based on the assumption that the flow
1988-12-01
disseminated silt and shale partings. The unit is medium-bedded and is characterized by numerous fossils of the brachiopod Resseralla fertilis . The... runoff from the Base is collected by the storm sewer system and discharged to McCrory Creek (Figure 6). The confluence of McCrory Creek and the Stone
1982-07-01
and waste treatment pilot plants . Developed odor control program which suc- cessfully reduced odor emissions and represented Union Carbide at a public...the runway where oil and grease has been detected as well as the discharge from the City of Goldsboro waste- water treatment plant which occurs within...There are no known threatened or en- dangered plant species on base. The only endangered animal species which may potentially inhabit the base is the Red
1985-08-30
technology for objective assessment of adverse effects. A Phase III requirement can be identified at any time during the program. 4. Phase IV - Operations...earth’s field can be asso- ciated with naturally occurring materials, or buried iron objects and remnant cultural features associated with man’s...for as * adequately as that of its own personnel.I 2. Obviously, such objectives can be attained only by the cooperation of all concerned. Therefore, it
Chang, D P
1998-01-01
Outreach, training, technology transfer, and research are often treated as programmatically distinct activities. The interdisciplinary and applied aspects of the Superfund Basic Research Program offer an opportunity to explore different models. A case study is presented that describes a collaborative outreach effort that combines all of the above. It involves the University of California's Davis and Berkeley program projects, the University of California Systemwide Toxic Substances Research and Teaching Program, the U.S. Navy's civilian workforce at the former Mare Island Naval Shipyard, Vallejo, California (MINSY), a Department of Defense (DoD) Environmental Education Demonstration Grant program, and the Private Industry Council of Napa and Sonoma counties in California. The effort applied a Superfund-developed technology to a combined waste, radium and polychlorinated biphenyl contamination, stemming from a problematic removal action at an installation/restoration site at MINSY. The effort demonstrates that opportunities for similar collaborations are possible at DoD installations. PMID:9703494
The Installation Restoration Program Toxicology Guide. Volume 1
1989-07-01
affinity for adipose tissue , which is more prevalent in women and would result in less unchanged chloroform and more carbon dioxide exhaled. This...magnesium, potassium, sodium, tin, zinc , and their alloys. ADI Acceptable daily intake ADL Arthur D. Little, Inc. Adenocarcinoma A malignant tumor...originating in glandular or ductal epithelium. Adenoma A benign growth of glandular tissue . ae Acid equivalent Aerosol A suspension or dispersion of small
1985-07-01
Shall not impose water uses, unless naturally occurring (generally ɘ.015 mg/l) Gross Beta Radioactivity <,000 picocuries/liter (pCi/l) Str nt till 9J...trace - Chlorine "s chloride ..... _47.0 35.0 H-rdness 5.2 , 94 Iron .... __0.10 4,.70 Copper Lead Pheno l,k~.Iinlty ____ ______ __ ______ To t a I_" Mung
Installation Restoration Program Records Search for Luke Air Force Base, Arizona.
1982-06-01
These soils were formed in recent alluvium derived from a wide mixture of rock type, including andesite, basalt , schist, rhyolite, and granite-gneiss...were originally derived from granite, granite- gneiss, schist, andesite, basalt , and limestone. Permeability is moderate (same as Gilman series...alluvium is the crystalline rock, granite, granite-gneiss, anyolite, schist, andesite, basalt , and limestone, which eroded from the mountains, and were
Installation Restoration Program Records Search for Davis-Monthan Air Force Base, Arizona.
1982-08-01
inspection labs, and corrosion -2- control shops. These industrial operations generate varying quantities of waste oils , fuels , *solvents, and cleaners. The...standard procedures for the disposition of the majority of the waste oils , fuels , solvents, and cleaners has been (1) fire department training...and corrosion control shops. These industrial operations generate varying quantities of waste oils , fuels , solvents, and cleaners. The total quantity
1983-12-01
clarifiers, activated sludge units, trickling filters, aerobic and anaerobic digesters, and various dowatering devices and recommendations for...for locations of water- bearing fractures. Additional responsibilities included drilling with mud and air rotary drilling rigs as well as bucket auger...interpretation. Also conducted earth resistivity surveys in Georgia and Alabama Piedmont Provinces for locations of water- bearing fractures. Additional
1984-11-01
quantities of vegetative grco th thr¢cu:ho r ts area. Infiltration of runoff and drainage waLers wuuld o icu n . this area. 3.3.2 SurfEa:- Waer Quality...Wisconsin 608-266-7809 Kevin Kessler Groundwater Coordinator Wisconsin Department of Natural Resources Madison, Wisconsin 608-267-9350 Frank Schultz
Identification of Critical Biological Parameters Affecting Gastrointestinal Absorption
1990-01-01
invention that may in any way be related thereto. Please do not request copies of this report from the Harry G. Armstrong Aerospace Medical Research...BALLINGER, Lt Col, USAF, BSC Chief, Toxic Hazards Division Harry G. Armstrong Aerospace Medical Research Laboratory UNCLASSIFIED SECURITY CLASSIFICATION OF...involved in a very large task of hazard management through its Installation Restoration Program. The pioneering efforts of the Armstrong Aerospace
The Installation Restoration Program Toxicology Guide. Volume 2
1989-07-01
producing substance. Carcinoma A malignant epithelial tumor. CAS REG NO Numeric designation assigned by the A.~’erican Chemical Socecty’s Chemica ...violent, exothermic, and capable of causing violent rupture of sealed containers. ABBREVIATIONS AB-I1 Polymerization A chemica reaction, usually carried...a deleterious effect on the taste and/or odor of human food derred from aquatic environments cannot be discharged into inland surface waters
Installation Restoration Program, Phase II (Stage 2-1). Volume 2.
1985-05-01
Worthington OH PAGES: 89 SOURCE: Radian Library COMMENTS: General manual for well drilling, sample collection . Includes good elementary background. FIRST... Collected from the Base Industrial and Domestic Waste Water Treatment Plants and Field * Sampling Data PAGES: 75 p. SOURCE: Capt. Mario Ierarti * COMMENTS...Analytical results for samples collected from the * base industrial and domestic wastewater treatment plants have been included. RADIAN FIRST AUTHOR
1985-12-20
Kalles . 1976. Evaporation rates of methylene chloride, chloroform, 1,1,1-trichloroethane, trichloroethylene, tetrachoroethylene, and other chlorinated...State University (1969) M.S., Geology, University of Washington ( 1971 ) . . Ph.D., University of Washington (1979) " EXPERIENCE 1984 to Date Senior...ducted environmental assessments for Pacific Northwest construc- tion projects. L- 1971 Project Geologist, SEREM of Alaska (BRGM-France). Responsibil
The Installation Restoration Program Toxicology Guide. Volume 4
1989-07-01
64.15 64-5 JP-4 Fuel-Water Partition Coefficients (K,) for Selected Hydrocarbons .......................... 64-20 04-6 Acute Toxicity of Components of JP...65.11 65-3 Equilibrium Partitioning of Select Gasoline Hydrocarbons in Model Environments ............... 65-14 65-4 Acute Toxicity of Components o...66-27 66-5 Acute Toxicity of Components of Fuel Oils ............ 66-37 67-1 Composition Dat,- for Stoddard Solvent
Operable Unit B1 Interim Record of Decision. Installation Restoration Program (IRP)
1993-07-28
Geology ..................................... I-1 2.0 SITE HISTORY AND ENFORCEMENT ACTIVITIES ........... 11-5 2.1 Background on Contamination Problems at...McClellan AFB OU BI . 11-5 2.2 Previous Studies ................................ 11-5 2.3 Regulatory and Enforcement History .................... 11-7...1-4 2-1 History of OU BI ...................................... 11-6 4-1 Cross-Section A-A’ of OU B.I
1994-04-01
measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the
Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska
1989-04-01
DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and
Installation Restoration Program Preliminary Assessment Naknek Recreational Camps, Alaska
1989-04-01
training, as well as other environmental matters. DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design...operations, and company R&D efforts. 3 DETOX . Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United States, responsibilities...resulted in establishing a widespread customer interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as
Installation Restoration Program. Phase 1. Records Search, England AFB, Louisiana
1983-05-01
compound shown on Figure 4.3. No herbicides, expired DDT or other pesticides were stored at this site. Some battery acid was stored in plastic boxes...Union Carbide Corporation, Chemicals and Plastics Divi- sion, Environomental Engineering Department. As a pro- cess/project engineer performed...paper mill waste treatment facility. Project Manager on Solid and Hazardous Waste study for a diverse chemicals and plastics production facility
Installation Restoration Program Phase 1: Records Search of Hanscom Air Force Base, Massachusetts
1984-08-01
Engineer o Kevin R. Boyer, P.E., Project Manager and Civil Engineer o Alfred N. Wickline, Records Search Team Leader and Soil Scientist o Claudia A...INVESTIGATION TEAM :I.., 44. ’m4, Use or disclosure of proposal data is subject to the restriction on the Title page of this Proposal. KEVIN R... KEVIN R. BOYER, P.E. Page 2 of 3 While working under the USEPA’s Field Investigation Team (FIT) program, Mr. Boyer was part of a quality assurance (QA
1989-01-30
D-007 & Hazardous Materials Agency 1 CETHA-TE Task No. 11 . ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS ATTN: CETHA-TE-D...PROGRAM IPROJECT TASK IWORK UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include SecurityClassification...Peter J. Marks 3a. TYPE OF REPORT 13b. TIME COVERED T14. DATE OF REPORT (Year, Month, Day) 115. PAGE COUNT Final FROM 1 /87 TO_1/89 11989 January 3 6
1984-08-01
10 31984 . PREPARED FOR UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY BROOKS AIR FORCE BASE, TEXAS 78235 ,,c.’p! ed di...Force August 1984 Occupational and Environmental Health Laboratory I3 NUMBER OF PAGES Aerospace Medical Division (AFSC) 249 total pages• ~~Brooks Air...PROGRAM BACKGROUND i-I 1.2 FACILITY HISTORY 1-3 1.3 DISPOSAL SITE DESCRIPTIONS 1-b 1.4 PROJECT STAFF 1-20 2.0 ENVIRONMENTAL SETTING 2-1 2.1 METEOROLOGY 2-1
Installation Restoration Program Records Search for Bergstrom Air Force Base, Texas.
1983-07-01
August 1981. "Pilot Plant Study of Copper , Zinc, and Trivalent Chromium Removal by Adsorbing Colloid Foam Flotation ." M.S. Thesis, Vanderbilt...graduate school and one of his activities included researching the removal of heavy metals, including copper , zinc and trivalent chromium, using a large...scale adsorbing colloid foam flotation pilot plant. Professional Registration Engineer-In-Training, Florida % -7. GREGORY T. MCINTYRE Membership in
No Further Remedial Action Planned Decision Document for Site 3.
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery
1996-04-01
This study is to screen and evaluate remediation alternatives for IRP sites at Alpena CR TC, Alpena , MI. The purpose of this FS is to develop, screen... Alpena CRTC. The first step in the PS process is to identify the RAOs and general response actions (GRAs). RAOs consist of medium-specific or site
1995-06-01
Remedial Investigation Report of Sites l-9 at Alpens CRTC Alpena Ml. Volume II Sections 4-6. A remedial investigation was performed on 9 sites at the... Alpena CRTC to determine the extent of contamination at the sites. The sites involved ill this investigation include: Site 1 POL Storage Area; Site 2
1996-05-01
This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 2.
1986-10-01
contaminatioa. Details of the data base received daily over a lifetime. For non - feeding studies on experimental used in these projections for each of...might be generated experimentally for a evaluation of the health effects of the highest no-observed-adverse-effect-level non -carcinogenic end-point of...8217 HARDFILL: Disposal sites receiving construction debris, wood, miscellaneous spoil material. HARM: Hazard Assessment Rating Methodology HAZARDOUS
1986-06-01
63’ Reference Date Tinx- Point Elevation: Drilling Started:11/8/84 1330hrs Drillinz Cornpleted:11/12/84 1100 Site Sketch Waer Leel: 13.5’ 11/9/84 0900...Box 1401 TELEPHONE (302) 736 4761I DOVER. DELAWARE 1 9903 I MEMORANDUM 3 TO: Mr. Kevin Burdette FROM: Philip J. Cherry’j DATE: October 22, 1984 The
Installation Restoration Program. Phase 1. Records Search, Scott AFB, Illinois
1985-04-01
mission of defense of the United States, has long been engaged in a wide variety of opera- tions dealing with toxic and hazardous materials. Federal...Histopathology-Cytology Sewer Dental Clinic/Laboratory 1680 Yes Yes DPDO, Sanitary Sewer, Medical Logistics Radiology/X-Ray 1680 Yes Yes DPDO, Sanitary...disintegrate. HALOGEN: The class of chemical elements including fluorine , chlorine, i bromine, and iodine. HALON 1211: A fire extinguishing agent
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
Installation Restoration Program Preliminary Assessment Kalakaket Creek Radio Relay Station, Alaska
1989-04-01
area (Cass, 1959). According to the U.S. Soil Conservation Service, the soils in the general vicinity of Kalakaket Creek are of the Pergelic ...Cryumbrepts-Histic Pergelic Cryaquepts, very gravelly, hilly to steep association. The association is found in glacially carved mountain valleys, moraine foot...two other components. Of the principal components, Pergelic Cryumbrepts, very gravelly, hilly to steep, accounts for 45 percent. These are well drained
Installation Restoration Program. Phase 1: Records Search, Sheppard AFB, Texas
1984-02-01
Environmental Response, Compensation, and Liability Act (CIERA) of 1980, by Executive Order 12316, and 40 Ci 300 Subpart F (National Contingency Plan). CCLA...hensive Environmental Response, Compensation, and Liability Act of 1980 (CURCLA). A potentially hazardous waste is one which is suspected of being...site for agricultural purposes to prevent food chain contamination. Silvicultural use Restrict the use of the site for silvi- cultural uses (root
Installation Restoration Program. Phase II. Confirmation/Quantification Stage I.
1986-02-24
Drilling and sampling three...borings at Site 8; o Drilling and sampling three borings at Site 11; and o Drilling and sampling three borings at Site 12. The ground water samples...8217-"~~~~~~.."." . " -’ - . .. . ;’ "..-. ’,"",,.- - -".-" - ’ -- -... ... ~ -. . ... ... " " 1 *. Sites Recommended Action Rationale U 8 Drill and sample one background To estimate
1984-10-01
8 iii "i t-. Table of Contents (cont.) Section Title Page -APPENDIX A Acronyms, Definitions, Nomenclature and Units of Measure B Scope of Work, Task...Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective Action Only...Problem Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective
1989-03-21
Seattle.Washington 98108 (206)767-5060 Chemistr . Microbklog. and Technical Services 1. TO: Science Applications International Corporation LABORATORY I.D...Certificate 940 South HarneySt.. Seattle.Washington 98108 (206)767-5060 ) Chemistr . Micrcbiob .and Technical Services TO: Science Applications...HarnreySt Seattle.Washington 98108 (206)767-5060 Chemistr " Microbiocoy and Technical Services SAIC LABORATORY NO. 3894 APPENDIX A Method Blank
Installation Restoration Program. Phase I. Records Search, Vance Air Force Base, Oklahoma.
1984-07-01
cadmium , and descaling solutions. The general trend in waste disposal over the years since VAFB first began operation has been from 3 largely unsegregated...generated at the jet engine shop and metal plating shops and consists of phosphoric acid, chromic acid, potassium permanganate, cadmium , and descaling...benzene, MIBK, carbon tetrachloride, MEK, methylene chloride, and acetone. The metal analytes should include cadmium , chromium, copper, iron, lead
Installation Restoration Program. Phase I: Records Search Goodfellow Air Force Base, Texas.
1985-03-01
CHDRO - ARSENIC SARIUM, CADMIUM MIUM. COPPER. IRON, DIS- DIS- DIS- DIS- DIS- DIS- SOLVED SOLVED SOLVED SOLVED SOLVED SOLVED TIME (UOIL (UCIL (UGIL (UG/L... cadmium , chromium, copper, iron, lead, manganese, mercury, nickel, silver, and zinc. The recommended parameters include those compounds known or...8217. ... . . -. * -:,-..’... .... ’.... ...’. .’..".-... ... -......- . ..............-............... . ..... .. APPENDIX A (Continued, Page 2 of 7) Cadmium A metal used in batteries and other industrial
1986-03-21
Firm hazardous waste contamination investigations in Utah and Colorado . o Conducted ground and surface water sampling for Durango S UMTRAP (Uranium...BASE COLORADO DAMES & MOORE 1550 NORTHWEST HIGHWAY PARK RIDGE, ILLINOIS 60068 MARCH 21, 1986 FINAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...FOR BUCKIEY AIR NATIONAL GUARD BASE COLORADO HEADQUARTERS AIR NATIONAL GUARD COMMAND SURGEON’S OFFICE (ANGSC/SGB) BIOENVIRONMENTAL ENGINEERING
1990-02-01
PRESENT C,(8;2) 131o sia &1 OTE MUNICIPAL WATER b9PLY WELLS: ON-BASE CW CITY OSARMENTO AREAS NW NORTHRIDGE WATEtj DISTRICT RW RIO LINDA AW ARCADE WATER...1ASE PRODUCTION WELL ACTIVE BAS PRODUCTION WELL ., CITY WELL T #f CALTRANS WELL . EXTRACTION WELL 0 500 1000 N : SCALL IN FEET If-3. 82
Installation Restoration Program (IRP). Operable Unit B1 Remedial Investigation/Feasibility Study
1993-07-01
Alternative Evaluation Criteria ......................... 8-2 8-2 Remedial Alternative Evaluation Criteria Rating System ................ 8-3 8-3...ies, various technologies and process options relative numerical rating system was developed were identified and screened on the basis of (see Table 8-2...extensive paving and PCBs were found (north/central ditch). This storm drainage system , and because of the ditch was paved with asphalt in 1981; before
1988-11-01
poorly sorted, not I E compacted, very plastic . Contains siliceous N diatoms and spores. Organic content high (17.2 T percent of sample lost during...physical character of a rock (e.g., particle size, color, mineral content, primary strutures, thickness, weathering caracteristics , and other physical
Installation Restoration Program. Phase 1: Records Search, Beale AFB, California
1984-04-25
following reasons: (1) to provide the continued protaction of human health, welfare, and the environment; (2) to insure that the migration c:-. potential...Education B.S. in Biology (magna cum laude), 1975, Stetson University, Deland, Florida Ph.D. in Ecology, 1982, State University of New York, Stony Brook...ecology, entomology, plant ecology, population bio- logy, genetics, and general biology . Developed and coordinated laboratory and field exercises
Installation Restoration Program. Phase II. Confirmation McClellan AFB, California. Volume 2.
1983-06-01
ARM SYSTE . Hazard Assesment Rating Methodology. HEAD. Height of the free surface of fluid above any point in a hydrau- lic...pest/herb/metals) previous sample was insuf- 1 gallon bottle ficient. Hydrocarbons were (GC/NS) on top of water surface , I VDA bottle about 1/2 inch... surface . Water became 1 quart polyeth- silty during bailing. Samples ylene bottle waere obtained using the glass/ (cyanide) Teflon sampler. Both the
1990-05-01
ELME’IDORF AFB, AK UNITED STATES AIR FORCE OCCUPATIONAL & ENVIRONMENTAL HEALTH LABORATORY (AFSC) ilb(. IiCAL Sr.(VICES DIVISION (AFOEHLi £3) I BROOKS AIR...UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY (AFSC) TECHNICAL SERVICES DIVISION (AFOEHL/TS) BROOKS AIR FORCE BASE, TEXAS...the following criteria: technical feasibility, institutional requirements, environmental impacts, public health impacts, and cost. This Alternative
Installation Restoration Program. Phase I. Records Search, Hancock Field, New York.
1982-07-01
purplish red, red, gray, green or black shale (major fraction) and shaly dolomite (minor fraction). The unit is poorly stra- tified and reaches a... fractured and jointed locally. At Hancock Field, the Vernon is typically overlain by a thin layer of glacial till. Test borings advanced at the Semi...the consolidated rock aquifer, composed of shales and dolomitic shales of the previously described Vernon Formation. Water is contained in this unit
The Installation Restoration Program Toxicology Guide. Volume 3
1987-06-01
organ because of injury or disease. log Kow Log of the octanol-water partition coefficient. Lower The lowest concentration of the material in air which...involved in clotting. SGOT Serum glutamic oxalacetic transaminase, an enzyme released into the serum as the result of tissue injury , especially injury ...to the heart and/or liver. SGPT Serum glutamic pyruvic transaminase, an enzyme % released into the serum as a result of tissue injury , 1: especially
1983-06-01
8217rAPTYT 24. PAý’XI?!C ( ALTF??iATIVFS (CASJF TWC- RA Ar ’FP!NATTV\\F COPTACTI’G METHOD 1 Chpmrical Feciiiction Linu ~i/Tacgnon 2 (-,a m ra Trra.Ii a...Clifford Randall, and Paul King (1974), "Biological Treatability of Trinitrotoluene Manufacturing Wastewater," Journal of the Water Pollution Control
1991-02-01
Pliocene I Neogene 5 Miocene o 0 24 Oligocene Paleogene Eocene 58 6 Paleocene 5I56 Cretaceous u 144- 0 Jurassic 0N 208- Z TriassicI 245- (L Permian 286...and its unnamed tributary I are classified as warm water fisheries. G. Groundwater Use of Uppermost Aquifer. I Site Nos. 1-3, Factor Rating 2. The
Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.
1982-04-01
Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975
Installation Restoration Program Preliminary Assessment Gold King Creek Radio Relay Station, Alaska
1989-04-01
to steep Pergelic Cryaquipts- Pergelic 3 Cryochrepts association. The Pergelic Cryaquepts make up 40 percent of the association. These soils are poorly...occurs at shallow depths. 1 Pergelic Cryochrepts make up 35 percent of this association. These soils are well drained and occur on high ridges and...is at a depth of 20 to 40 inches. The remaining soils within this association include Pergelic Cryorthents (15 percent), Pergelic Cryorthods (5 percent
Installation Restoration Program Preliminary Assessment Bear Creek Radio Relay Station, Alaska
1989-04-01
Cryachrepts, very gravelly, hilly to steep - Histic Pergelic Cryaquepts, loamy, nearly to rolling association. This association is extensive on hilly...loam. On steep slopes, these soils are only 20 to 40 inches deep over bedrock. 3 Histic Pergelic Cryaquepts, loamy, nearly level to rolling, make up 25...usually 10 to 20 inches below the peaty surface. 3 Histic Pergelic Cryaquepts, very gravelly, hilly to steep, compose 10 percent of this association. These
1993-11-01
GUARD BASE BATTLE CREEK, MICHIGANI REGIONAL LOCATION MAP ýIG A NI -1 10t TAI MICHIAN I i~amoNL GUAR 1- 94Frie Lake ma 61 , 1cI Lose onI diI 0I...textile fabrics. Xylenes are also used in the manufacture of quartz crystal oscillators, hydrogen peroxide, perfumes , insect repellants, epoxy resins
1987-12-01
mineralogy and igneous petrology . Consultant to Shield Energy. Inc.; performed mudlogging and well site geology duties on 4,670’ wildcat weil in...Taylor County, Texas. Evaluated prospects for hydrocarbon potential. Prepared geologic reports for drilling prospectus. Geologist, Wold Minerals...Exploration Company; conducted geologic and geophysi- cal mapping in Precambrian metamorphic terrain of West Texas for talc depos- its. Supervised the drilling
Installation Restoration Program. Phase 1, Records Search. Chanute AFB, Illinois
1983-12-01
Ogle County in northern Illinois to Wabash County in the southeast part of the state. It occurs approximately two miles west of Chanute Air Force Base...AFB) Station I Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury Nickel Silver Date COD Grease (*) Phosphorus (50)* (1000)* (20)* (1000) • (100...MONITORING DATA SALT FORK CREEK BEFORE TRIBUTARY CONFLUENCE (Before Entering Chanute APB) Station 2 Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury
Installation Restoration Program. Phase 1. Records Search. Air Force Plant Number 3, Tulsa, Oklahoma
1983-12-01
treatment plant was designed for cyanide and chromium treat- ment. Wastes are collected in two separate sewer systems; acid-chrome, and alkali cyanide...reduction of hexavalent chrome to trivalent chrome with sulfur dioxide. After the oxidation and reduction are accomplished separately, the wastes are...uses of the water. CCNVEPSI N COATING WASTE: Acidic solution containinq chromium . 0COOLANT: An oil-water mixture used for coolina metal parts durirq
Installation Restoration Program. Phase 1: Records Search, Williams AFB, Arizona
1984-02-01
Minimum 4.5 Trace substances, maximum -. allowable limits, (mg/1) Arsenic 2.00 Boron 1.00 Cadmium 0.05 Chromium (hexavalent and trivalent ) 1.00 Copper...located in Building 32. Chromium , cadmium, and copper electroplating operations were conducted in a temporary building, T-31 . Paint stripping was... chromium plating wastes. The paint separator receives wastes from paint stri.pping operations that are performed in Buildings 25 and 1086. It also
Installation Restoration Program. Phase 1. Records Search, Lackland AFB, Texas
1985-02-01
governmental environ- mental projects. Environmental Engineering Department Head (1973-1976). Supervised staff involved in auditing environmental practices...V. -4 a a ; to- w w M, 4-. c* a a M - ~ a -- ~= a a a a a aa as-au ’- aC aCca - ~~~ - aa:0 a 0 24 X4 JU 2 a -- a. -~a - .wZ 2kD.4 4 ob0 m C C w 4a
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
Decision Document for IRP Site No. 3 - Storage Area at the USMC Sublease Area, California Air National Guard, 144th Fighter Wing, Fresno Air Terminal, Fresno, California. This report documents the data, conclusion, and recommendation to support a No Further Remedial Action Planned decision at Site 3 under the IRP.
Installation Restoration Program. Phase 1 - Records Search, Homestead AFB, Florida
1983-08-01
con- ducted on a weekly basis. Since the early 1970’s, water and Aqueous . Film Forming Foam ( AFFF ) have been the main extinguishing agents used. Fuels...were occasionally disposed of at the site. Typically, water and AFFF were used as fire extinguishing agents. The site received a HARM score of 66. This...project activities include designs for Owens-Corning Fiberglas; 36,000 gpm neutralization facilities for FC Corporation; wastewater reclamation facilities
Installation Restoration Program. Phase I. Records Search, Reese, AFB, Texas.
1984-06-01
engineering in flue - gas desulfurization plants, and corrosion asaessinnto of hazardous waste handling systems. Mr. Ellis is or has been an active participant...provean to evaluate lime- stones as wet scrubbers in flue gas desulfurisatios (VS) system. She vas task leader for the chemical ad physical analysis...11109163A-15 Debra L. lichmann PUBLIC&TIOUSIlEPOITS: lichmann, D.L., K.V. Luke, end J.C. Terry, " Flue Gas Desulfurization Chemistry Studies
Installation Restoration Program Records Search for Cannon Air Force Base, New Mexico.
1983-08-01
several years. A deteriorating black plastic liner was noted at the edge of the shallow pit. Approximately 4 to 6 inches of soil covered the rest of...subtotal/eximtm subtotal) 56 II. WASTE CARACTERISTICS A. Select the factor score based on the eatimeted quantity, the degree of hazard, and the...anticipated soil properties such as gradation, plasticity , or permea- bility by performing appropriate laboratory tests. In addition, soil samples may be
1987-02-20
Bacteriology; 8 years professional experience; served as Project Health and Safety Officer. 1-37 o Duane R. Boline - Ph.D. in Analytical Chemistry ; M.S. in... Chemistry ; B.S.E. in Physical Science; 18 years professional experience; served as Project Quality Assurance Officer. Complete biographical data...University, 1962 M.S., Chemistry , Einporia State University 1965 Ph.D., Analytical Chemistry , Kansas State University, 1975
Installation Restoration Program. Phase 2. Confirmation, Edwards AFB, California
1982-09-01
aquifer boundaries has created unique hydrological conditions, with fluctuating water levels and continuously changing regimes of confinement...wells, resulting in changes in the regional gradien,ý from north to south. Figure 2.3 shows the groundwater table contours as of 1979 (U.S.G.S., 1980...of 11 inches. The maximum mean monthly rainfall occurs in February with about 0.5 inch in one day (Envirodyne Engineers, Inc., 1981). In arid climates
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1991
1992-02-01
facility site cleanups. One key area where the Experts During FY 1991, 253 remedial ( AFB ), California; Fort Dix, New Groups are focusing attention...Dover AFB , Dela- process. Current approaches for is greater than the number of instal- ware; McChord AFB , Washington; selecting remedial approaches dis...lations, as more than one type of and Robbins AFB , Georgia. This courage new and unproven tech- action was taken at some brings to 12 the number of
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING
The Installation Restoration Program Toxicology Guide. Volume 3
1989-07-01
zvli UW OF TABLES Volun.e 4 (Cont.) 69-3 Chemical Additives ............................ 69-15 69-4 Acute Toxicity of Components of Mineral Base...659. Values were estimated by Arthur D. little, Inc. uwing Kow as the basis of estimation (See Introduction, VoL 1). Values of less than one are very...Introduction, Vol. 1). 659. Values were etfiinated by Arthur D. little, In~c. uwing Kow as the basis of. estimation (See Introduction, Vol. 1). Values of
Installation Restoration Program. Phase II--Confirmation/Quantification. Stage 1.
1985-03-01
four phases. Phase I, Initial Assessment/ Records Search, is designed to identify possible hazardous waste contami- nated sites and potential...7 71 -. - - IL’ -, 1% 33 AihlIII Is 33 n~iL t iiC UII! ii CL C LU 1-3, Phase II, Confirmation and Quantification, is designed to confirm the...additional monitoring data upon which design of mitigative actions are based. In Phase III, Technology Base Development, appropriate technology is selected and
2011-10-01
JBMDL’s flying mission. Installation Restoration Program (IRP), Hazardous Materials and Waste Management There are several IRP sites within the...McGuire airfield area; however, none are expected to impact the Proposed Action. Negligible impacts on hazardous materials management during tree clearing...would be expected as only minor quantities of hazardous materials are likely to be used. BMPs would be followed to minimize the possibility of a
1983-09-01
cold winters. Coldest temperatures ir. winter months are caused by high pressure systems which move rapidly dohn from central Canada cr Hudson Eay... dolomitic marble; or sand (30 to 60 feet), Glacial till (30 to 50 feet), and bedrock. The materials occurring above the bedrock in the vicinity of the...Trenton Group Iberville formation Noncalcareous black shale interbedded with 1000 dolomite . Stony point formation Predominantly calcareous black shale
Installation Restoration Program. Phase 1. Records Search Wake Island Airfield
1984-09-01
serviced transient Air Force aircraft at Wake Island. Detachments of the 6486th Air Base Wing (predecessor organization *of the 15th Air Base Wing...following groups: " o Base Operations o Transportation Division o Civil Engineering Division . Air Force facilities were located east of the 1700...since these materials were shipped to the base on barges. The contrac- tors also took waste oil from the Air . Force for use in their vehicles and
1988-01-01
under field conditions. Sampling and analytical laboratory activities were performed by Ecology and Environment, Inc., and California Analytical...the proposed AER3 test conditions. All test samples would be obtained onsite by Ecology and Environment, Inc., of Buffalo, New York, and sent to...ensuring its safe operation. Ecology and Environment performed onsite verification sampling. This activity was coordinated with the Huber project team
Installation Restoration Program Records Search for George Air Force Base, California
1982-06-01
located in the Mojave Desert. The climate is arid with long hot summers and short cool winters. The mean 3relative humidity ranges from 27 percent in...abitat Native plant and animal comunities on base reflect the dry climatic conditions of an upland desert region. Along the eastern border of the bas...soil conditions because of a low ground- water table and the dry climatic conditions. While native systems are disrupted in the immediate vicinity of
1989-02-01
contaminated by past disposal practices. Sampling and analysis was not included in the PA. B. MAJOR FINDINGS The Air National Guard has utilized...with 23 Base personnel and the field surveys identified 3 potentially contaminated sites resulting from past disposal, storage, and/or spills and leaks...characteristic petroleum odor. With visible evidence of released contaminants , there is potential for contaminant migration by shallow groundwater. Site No. 3
Installation Restoration Program. Phase I. Records Search, Plattsburgh AFB, New York
1985-04-01
Storage Area (WSA) drainage to the Salmon River, the POL and housing area drainage to Lake Champlaln, and the golf course streams and ponds drain...Sanitary Engineering; 2. Michael A. Zapkln, Project Director, M. Eng. Environmental Engineering and M.S. Biology - Team Chief and Ecologlst; 3. Andrew...college courses were offered to World War II veterans. This center became part of the State University system in 1950 and was known as Champlain College
Installation Restoration Program Records Search for MacDill Air Force Base, Florida.
1982-06-01
in Jun 1981 to identify the potential for contamination resulting from past disposal practices. On 26-27 Jan 82, representatives of USAF OEHL, AFESC...13 May 1979 8 Major Plant Communities at MacDill AFB III - 15 9 Location Map of Possible Contaminated Areas at IV - 21 MacDill AFB 10 Historical...RCRA) and implementing regulations. The purpose of the DOD policy is to control the migration of hazardous material contaminants from DOD
Installation Restoration Program Preliminary Assessment Bethel Radio Relay Station, Alaska
1989-04-01
third glacial stage of the Pleistocene * Epoch in North America . KNOB - A rounded eminence, as a knoll, hillock, or small hill or mountain. 3 KNOLL...Pleistocene Epoch in North America , after the Illinoian and before the Wisconsinan. SEDGE - Any of the family (Cyperaceae) of grasslike plants often found on...Pleistocene epoch in North America . I 3 GL-IO U I UREFERENCES 1. Department of the Interior List of Geological Survey Geologic and Water SupplY Reports
1982-09-01
Buffalo and Gramma grasses. The only native trees are plains cottonwood and some willows. Many introduced species exist at Buckley, including Bluegrass...irrigation purposes. The upper sec- tion of the aquifer is unsaturated. - No rare or endangered species of plants or wildlife are found at Buckley...was then made, based upon all of the above information and utilizing the decision tree shown in Figure 4.1, concerning the existence of potential for
Installation Restoration Program, Phase I: Records Search, Laughlin Air Force Base, Texas.
1985-03-01
and chemical * cleaning shops and consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The general trend in waste...0.016 Cadmium ɘ.010 mg/1 ɘ.010 Chromium 0.091 mg/l ɘ.050 Source: LAFB BES, 1984. STP Analysis Results, April 23, 1984. 3-33 -r --r - - - - 41 . N...consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The fire suppressants currently employed at LAFB and EPAux are AFFF
Installation Restoration Program for Richards-Gebaur AFB. Phase 2. Field Evaluation
1983-12-01
of the Phase I--Records Search. "ýThe specific task was to determine whether environmental contamination of groundwater or surface water had resulted...concentrations (4 and 5 ug/L, respectively) which exceeded the Missouri Water Quality Standards for groundwater (I ug/L). A limited followup study was...contamination of groundwater and surface water had resulted from waste handling and disposal at two ’and- fills on Richards-Gebaur Air Force Base (AFB
1988-07-22
Inc. of Savannah, Georgia and Tallahassee, Florida provided analytical services. Michael Newberry, Captain USAF, and Jeff Mason, 2d LT., USAF, from...2803-19 AG AP6 ST;- ES Ci eit 2803-20 A? APC S -2 ES 23033-23 AG .AF6 SD-S 2803-22 AC AP6 SD-4 E.> PARAMIETER 280u- .y 2&u r 23-2: 2803-22 Bezo (g.h.1
Installation Restoration Program, Phase 1. Records Search, Wheeler Air Force Base, Oahu, Hawaii
1983-07-01
the 3vegetation was already exotic, consisting of trees such as guava , koa haole, eucalyptus and silver oak, and shrubs and 3 grasses including lantana...Alkalioo Soap 5 gal GrounOd S~r Of f Base Fire Pit fir.Pit Of f Base PmecI" CoCAClo 20$ P 680 1S Sa.L Cro-..d tAint 10-20 gal 8w L..dt±u Off km. Thinmar
Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2.
1988-04-03
MOORE STANDARD OPERATING PROCEDURES WORK PRACTICES 1. Smoking, eating, drinking, and chewing tobacco are prohibited in the contaminated or...meter and detector are transported in a protective foam-lined case. The cell is tested before going into the field using the test feature and is...available prior to the start-up of field work, the 1"o1l ,ii . rvicts, materials, work space, and items of equipment to zu F.Vft. the nt1 tor
1988-08-01
control data (lat tarK., lab spikes, and lab duplicates) in the report , as well as field quality control data. j. For those metiods which employ gas ...FORCE BASE, TEXAS 78235-5501 NOTICE This report has been prepared for the United States Air Force by Environmental Science and Engineering , Inc. (ESE...testing, field sampling, contamination assessment report preparation, and recommendations for remedial actions. U.S. Army Toxic and Hazardous Materials
Installation Restoration Program Records Search for Mountain Home Air Force Base, Idaho.
1983-07-01
ornamental plantings. Mammals found on and around the base include coyote, black-tailed jackrabbit, cottontail, Franklin’s ground squirrel, and yellow - bellied ...Water Well Location Map. ::HILLI L - -- - • Depthin Feet Natural Ground Level Top Soil & Yellow Clay Subsoil Grey Basalt Rock-Medium Hardi30" Casing Grey... marmot as well as several varieties of small rodents. Birds which commonly nest on the base include American robin, house finch, English sparrow
1987-08-01
total recoverable trivalent - ambient water, the estimated level is 2 more sensitive than those tested. No chromium the avallabe data indicate - mg/L...freshwater aquatic chronic toxicity of trivalent chromium to life occurs at concentrations as low as sensitive saltwater aquatic life...epoxide Lindane Nethoxyohlor Diazinon Malathion Parathion Toxaphene 2.4- 2,A.5-T 2,JI,5-TP (silvex) barsenic barium cadmiumn chromium (total). copper Iron
Installation Restoration Program. Phase 1. Records Search, Lowry AFB, Colorado
1983-08-01
donated to the * Federal Government by the City and County of Denver. By 1940, two hang- , ers had been constructed . Nine hundred and sixty adjoining...facility was under construccion . In 1958, preparation for the Titan I Missile began with the activa- tion of the 703rd Strategic Missile Wing at Lowry AFB...last T-29 departed from Lowry AFB, ending Lowry’s years as an active flying base. * . Since 1966 significant construction of dormatories and offices
1990-05-01
11140 Rockville Pike Rockville, Maryland 20852 Contract No. DLA 900-82-C-4426 Completed by Science & Technology, Inc. 704 South Illinois Avenue Suite C... Environments . .......... 111-19 IV. SITE EVALUATION...................v-i *A. Activity Review ................. v-i B. Disposal/Spill Site Identification...approximately 120 feet north of a small pond and creek located on the south side of the airport on airport property. The Base conducted operations at
1992-10-09
1 IG° _A--- -- 1-3 i I 0o20 IEL NFr onln $o pm~ nt FApoimare) 1-2oAproxmat Bend ofeofperable Units a clla F 1290-07S. 3-3 RADIAN i COmPORATION I (RI... Marketing Office (DRMO) for receipt, storage, and resale of useable materials. The western half of the lot has been used for this purpose since it was first
1984-10-01
contamination resulting from previous waste disposal practices at Hancock Field .. o Recommend measures to mitigate adverse impacts at identified...best well to use in judging water quality impacts caused by the disposal activities. Slug tests (Hvorslev, 1951) were performed at each of the four... impact future samplings because this water will probably become mixed in the aquifer before the next sample round and if some remains . near the well
1988-04-01
epidemiological studies ; pending resolution of essentiality in human diet; EPA has not regulated arsenic as a carcinogen in drinking water 3ICadmium B1...Probable human carcinogen based upon sufficient evidence in epidemiological studies ; not regulated as a carcinogen in drinking water because there is...Carcinogenic in animal studies ; because of the extensive negative epidemiological evidence, EPA has proposed to regu- late lead in drinking water based on
Installation Restoration Program. Phase I. Records Search Columbus Air force Base, Mississippi.
1985-04-01
with the river flood plains and pine plantations on drier upland areas. Loblolly pine ( Pinus taeda) is the dominant planted pine and is used for pulp...Maintenance MCL maximum contaminant level Methyl ethyl ketone A solvent used in paint thinner, stripper, and a (MEK) wide variety of industrial...l milligrams per liter A-3 Methyl isobutyl A solvent used in paint stripper, thinner, and a - ketone (MIBK) wide variety of industrial applications
Vroblesky, Don A.; Casey, Clifton C.
2007-01-01
The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used innovative sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report evaluates a new type of pore-water sampler developed for this investigation to examine the subsurface contamination beneath the drainage ditch. The new type of pore-water sampler appears to be an effective approach for long-term monitoring of ground water in the sand and organic-rich mud beneath the drainage ditch.
1983-12-01
STATEMN’T L * N N 0UNCE D J UST I IICATION T DI Sr 141I IIIT ION / AVAII.ABII flV CODES )SFRIKB-T.OS AVAr.Aa[Ll-Y ANOi SPECIAL ePI A /DIST RIUTION STAMP...Storage Area No. 3 I C-3 Analytical Results for the Soil Sample Taken in the North Parking Lot APPENDIX D PHOTiOGRAPiS APPENDIX E USAF INSTALLATION...1970’s-1981 54 Storage No. 4 5 Underground Cyanide Mid 1950’s to La te 1970’s 51 I Vault i I 1 I I I FIGURE 1 00 z IWO zZi II : 0C OJ IL W z D 0j I co
Department of Defense Data Model, Version 1, Fy 1998, Volume 1.
1998-05-31
INSTALLATION-POSTAL-ADDRESS INSTALLATION-RESTORATION- ADVISORY -BOARD INSTALLATION-SURVEY INSTALLATION-USPS-POSTAL-ADDRESS INSTALLMENT- PAYMENT ...Standards 5 U SECTION 5 Entity Report 6 SECTION 6 Attribute Report 7 SECTION 7 Entity Relationship Report 8 SECTION 8 DoD Data Model Enhancements Report ...8 SECTION 9 Functional Area Using Model Report 8 Appendix A IDEFlx Modeling Conventions 8 Appendix B Acronyms ; 8 Appendix
Installation Restoration Program Phase 2. Confirmation/Quantification. Stage 1. Volume 1.
1986-10-10
FIGUR 1- EEA LNO EFIG I AiNLanfl GUARD BASESHOWING PHSE II INVTIGTOIE I 1- ........ Site No. - I MAA Site No.Northwest Landfill TS Site.No.4 West...Protective Steel PVC Cap Flush Mount in Casing Plastic Nelson Valve Box Land Surface PVC Cap . Cement Grout 0 L n aBentonite Pellet 4" Diameter Seal...12.0 feet BLS. Clays of high plasticity predominate in all three wells. No sand lenses were encountered and the topsoil at all three well locations is
Installation Restoration Program Records Search for Langley Air Force Base, Virginia
1982-06-01
Septic Tanks at Langley Air Force Base 12 Location of Oil /Water Separators at Langley Air Force Base 13 Location Map of Possible Contaminated Area at...No. J.) and old vehicle dumping area (Site No. 15). A-17 Location of old underground fuel lines--possible oil -saturated area. vi FIGURES--Continued A...18 Location of old wastewater treatment plant at the Main Base Area (Site No. 2). A-19 Location of old underground oil storage tanks-possible oil
1991-03-29
I0IYOiHPI1 ISenu n!W .46 ,.II I J LIo Yg I 0 lf I IJliGn I r IM,I I.E_ I IVAna di mjdIIi ~ LaIIII j~inc zo- 20 III IT _______ di ~ ’n F-256 / ____CHZN...VJ is the lijit of detecticq fcr ’thit cvicmud. ba~ ern 1flutic-1. irdicates in estisated trice a lh ANAL Y ST :________________ OrRF.OED BY
1986-01-24
at F7PTA, 3) old AVGAS distribution system at LFSA, and 4) southwest drainage system. Magnetic anomalies (buried drums) were identified at the...identified magnetic anomalies (buried metals) and determine whether any are pesticide drums or cans - Dispose of excavated material in an appropriate...intervals. The survey was hindered by the presence of three large iron warning signs at the site. These signs created a large magnetic anomaly in the
1984-09-21
O’Flaherty, R.W. Greiling, and B.J. Morson. A-2 [ . . . . . . .. _ . . . . . . . . . . .. ... . . . . DAVID W. ABBOTT EDUCATION University of Puget Sound , B.S...discovery of the largest aquifer system heretofor discovered in Kitsap County and perhaps in the Puget Sound lowlands. e City of Ellensburg, Washington...is a lead author of a report ’Dr EPA Region X in which she iden- tified major water uses within designated subregions of Puget Sound which could be
1980-12-01
40.8 Sodium 70.1 Zinc 0.01 37 The process includes the following steps (Pichat et al., 1979): - neutralization precipitation (silicates, borates...Compressive Strength of Polyester - Encapsulated Sodium Sulfate Waste Composite ....... .............. 64 9. Deep Chemical Mixer Mounted on a Barge...zinc, copper, lead, manganese and tin; sodium salts of arsenate, borate, phosphate, iodate, and sulfide; and sulfate salts. Sulfate salts form calcium
Installation Restoration Program Records Search for Air Force Plant 4, Texas.
1984-08-01
treatment, landfills, waste oil pits, chrome and die yard pits, disposal and spill sites. A total of 20 sites were ranked using the HARM (Hazard...Meteorology Iii-i B. Physical Geography 111-3 C. Hydrology 111-24 D. Ecology 111-44 1. Habitat 111-44 2. Threatened or Endangered Species 111-45 IV. FINDINGS A...ASSESSMENT RATING METHODOLOGY K. SITE RATING FORMS L. GLOSSARY OF TERMS M. LIST OF ACRONYMS, ABBREVIATIONS, AND SYMBOLS USED IN THE TEXT N. REFERENCES 0
1984-10-01
Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agriculture Tennessee State Game & Fish Commission...FIGURE 34 oa LU a U. ww COOI w LU z 000 Z00 0 z 3-2. ES NGIEERIG-SCENC S° drain AEDC. Hunt and Huckleberry Creeks drain northward toward the Little ...Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agricultrue Tennessee State Game & Fish Commission
Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1.
1987-01-09
Colorado and is surrounded by the cities of Denver and Aurora . The base is situated on the western edge of the Great Plains physiographic province in a...either the Denver Water Board or the City of Aurora . Lowry AFB is served by the Denver Water Board. Even though domestic water is available to all homes... Aurora in the northeastern quadrant of Colorado (Plate 2). The base was established in August 1937 on the site of the Agnes Phipps Memorial Sanitarium
Installation Restoration Program. Records Search, Newark AFS, Ohio
1985-04-01
APPENDIX J - Aerial Photograph Newark Air Force Station . . . J-i i I I 1 I ! I iv I LIST OF TABLES No. Page 1 Potential Risk Ranking Based on Final HARM...accuracies of standards used at base level are directly traceable to the 3 Air Force Measurement Standards Laboratory at AGMC. The primary standards from...Approximately eight years ago the Base Exchange released it to the motor pool. Service is provided for all Air Force vehicles and equipment on the
1985-09-01
Special Olt 9-; ~ ~ ~ ~ ~ J -..-- w--- ’- V - V --y a - . . . . . . RADIAN APPENDIX A Definitions, Nomenclatures and Units A- i . -- 5. . -, - - STAGED...contaminatg ed 11 a thei±r~ iMei S-t.r-roundlin. Review the u f -r Ai Force investigationa. These *r-esu I.ts shall~ I & prvie une eatcvr B-5 -9 V q M I ...results or highly complicated nonlinear mathematical modeling , should * be precise, clear and technically defendable. This section should clearly
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusetts, lies within the boundaries of the towns of Falmouth, Mashpee, Sandwich, and Bourne. The Area of Contamination (AOC) known as Chemical Spill 3 United States Coast Guard (CS-3 (USCG)) is located on Lee Road, in the south central portion of the MMR. The Air Force Center for Environmental Excellence (AFCEE) Installation Restoration Program Office at Otis Air National Guard (ANG) Base, Massachusetts.
Installation Restoration Program Records Search for Nellis Air Force Base, Nevada.
1982-06-01
VPAL3C CZaer:ori Sabt~rv* 1 0.22 (’tus qU~ijy PFA TWP"th’..y CSwbscore 2 0.30 plus .’.C.121 tieSakscoro x 0.24 plusTHIS ?AaE I’S B3SI QU . Fw.TV .r...Negative 4A.1 tion. Chicago 6. Illinois.) Flash Point. Tag Closed Cup. min 100’ F. 1380 F. 4.4.1 3. REQUIREMENTS1 Sulfuric add ab- sorption . max. ..- 5% 9
1987-05-01
Maintarer.e ground water 2 scil borinF 8 hand auger 12 Disna:-e Area No. 10 (DA-10) - Entomology Bldg UO soil boring 6 13 Landfil: Nc. 1 (LF-1) ground...l’JSZIL I ’ SCIL SO V ; 7 ILill ( oi[ ;Q0 SO IL. $;I 60 . *O (3 .1 *, W i ; Q,. t.t WLi it hI OX aoPit IV 3 ’ Table F-1 (Cont.) 6OIOOtO LAB WPLIAT
1991-11-22
the stewards of more than 25 million acres of land. Our military installations contain some of our Nation’s most sensitive and ecologically valuable...8 1 The Natural Resources Manager’s Role in the Superfund Program’s Ecological Risk Assessment M r. M att K lo...these cleanup sites are in remote parts of the country, and as such, were not of immediate concern for cleanup. Now that ecological restoration is a
Commander’s Guide to Public Involvement in the Army’s Installation, Restoration Program
1990-11-01
posed by chemicals at the local level and for dealing with emergencies within their communities. Industry is responsible for gathering information on the...helping set up procedures to handle chemical emergencies. At the federal level, EPA is responsible for ensuring that industry complies with the law’s...2816 Agana. GU 96910 011-671-734-2671 PUERTO RICO Environmental Quality Board 204 Del Parque Street Mail to: P.O. Box 11488 Santirce, PR 00910 (809) 725
1984-12-01
coupled with the enactment of environmental legislation at the Federal, state, and local levels of government , has required action to be taken to... governing the disposal of hazardous waste is the Resource Conservation and Recovery Act (RCRA), as amended. Under Section 6003 of the Act, Federal agencies...disposal sites and make information available to requesting agencies. To assure compliance with these hazardous waste regulations, DoD issued Defense
1985-12-01
Confirmation/Quantification. Moody AFB- GA _____ S12. PERSONAL AUTHOR(S) .. ’ Steinberg J.A. and Thiess, W.G. 13.& TYPE OF REPORT 13b. TIME COVERED 14I. DATE...2.3.2 Soils On the high ground western portion of the base, the surface soils are mostly in the Tifton series. The soil profile consists of about 2 to...Florida Department of Environmental Regulation FWQS Florida Water Quality Standards gpd Gallons per day gpm Gallons per minute GC Gas chromatograph
1989-01-01
survey for the southern part of Washoe Ccunty provides data on sane physical and chemical properties of soils . The data deteied to be pertinent to on...base soils is presented in Table 3, Physical and Chemical Properties of Soils Occrring on the NVANG Base in Reno, Nevada. Analyses of surface water and...NVANG Base . . . ...... .. . .. . . 111-6 3. Physical and Chemical Prperties of Soils Occrring on the NVANG Base in Reno, Nevada
1986-10-06
surface geophyjcal sur’.-y using electrical recistivity and magnetometer to delineate the buried -renche , to prove the e zist nc./ae~ neme. of b~r...Department of Energy’s garbage-to-gas proof of concept facility at Pompano Beach, Florida. As Co-investigator conducting Bacterial and Trace Organic...advised the bacteri - ological analyst on techniques for identification and quantitation of environmentally important bacteria. 1984-1985 Chem-Technics, Inc
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
1986-06-10
Environmental Research Group (ERG) Laboratories of Ann Arbor, Michigan, and a duplicate set sent to OEHL’s laboratory in San Antonio, Texas. The remainder of...sites and well clusters , and the overall sparsity of data points at the base, a water table aquifer potentiometric surface map for the entire base could...L _ MW2-34 The predominant solid wastes disposed at this site were paper and domestic refuse, old wood from demolished structures, general
Installation Restoration Program. Phase I: Records Search Minot Air Force Base, North Dakota.
1984-12-01
MAFB and Grand Forks AFB. This move localized command along with •. •• insuring that assigned units would be capable of conducting aerial...were realigned !•;>•’ to become members of the 57th AD. Also on May 1, Grand Forks AFB was \\.•/ assigned to the 4th AD at F.E. Warren AFB, Wyoming...potential for vertical - - stratification of possible ground water contaminants. During drilling, Shelby tube samples should be taken to provide soils
1989-05-01
AFB Statement of Work. The Phase II Stage 1 investigation of Malmstrom AFB and two off-Base sites at Shelby and Brady, Montana are described in a...Flathead National Forest Headquarters in Kalispell and the Big Fork Ranger Station in Big Fork . Because there has been litigation involved with this...reviewed by phone. An interview at the spill site was held with Mr. William Pedersen, U.S. Forest Service Ranger for the Big Fork District. He personally
1988-11-01
Biochem., 46, 200-208 (1972). Walter, R. L., Willis, R. D., Gutknecht, W. F., and Joyce, J. M. "An- alysis of Biological, Clinical and Environmental...Constituents (POHC) Measurements during Hazardous Waste Trial Burn Tests," Journal of the Air Pollution Control Association, 35(2), 143-147, rebruaryI 99...to June 1975. University of Virginia. Medical Technologist, Student Health Center. Performed various clinical laboratory tests, such as complete
1993-06-30
agency (California Health and Safety Code [H&SC], Section 25179.6[a][2]). 1.2.5 Porter-Cologne Water Quality Act and Related Policies The Porter-Cologne...which endangers the comfort, repose, and health and safety of the public. SMAQMD Rule 403 requires that all reasonable precautions be taken not to cause...concentration values on Figures C-1 through C-IO. Differences in soil physical parameters, listed in Table C-2 for different compounds were questiotned
Installation Restoration Program. Phase I. Records. Loring AFB, Maine.
1984-01-01
forest, mixed forest, forested bogs, streams, and ponds. Managed timber lands total 4,635 acres on Loring AFB. Major harvested tree species include...Habitat 111-22 2. Threatened and Endangered Species 111-23 IV. FINDINGS IV-1 A. Activity Review IV-l 1. Industrial Waste Disposal Practices IV-1 2...Site No. 13, the BX Service Station, a number of cedar trees in the area of the fuel-saturated soil appear to have been dead for several years. 3
1987-10-01
discharged from these wells was containerized and transported to the base oil separator plant for treatment. It is estimated that approximately 25 percent...and 29). The fly ash is probably associated with the power plant tc the west of the Bulk Fuel Storage Area. Just below the fill, at 13 to 15 feet, is...been widely used in petroleum refineries and fuel terminals in response to similar spill impact situations. Although the collect ion/recov- ery
1984-10-01
risk level.derive human health criteria. Most evaluation and synthesis. Scientific SurmyofteJlrc &2criteria are based solely on exposure judg~~nt was...State drinking water and human health standards, criteria, and guidelines applica- ble in the State of New Jersey. On November 28, 1980, the U.S...established recommended maximum concentrations for acute and chronic exposure to these pollutants by both humans and aquatic life. The derivation of these
1990-12-01
Force ......,,...Human Systems Division (AFSC) .................. . . .. . . RP Pr ra -Offic (HSDIYAO) .............. ........... Brooks Air Force...intra- system piping. Six months to one year would be required to complete and integrate these components. EECA/021491/jlh 6-39 RADIAN COlVOR AT 1O IN... system capacity has been exceeded. It is a possibility that during severe storm events, the groundwater extraction wells will be shut down to avoid
1991-10-01
the Industrial Wastewater Collection System (IWCS) for leaks and analyzed wastewater passing through the wastewater lines (the IWL) at McClellan AFB (EG...Wastewater Collection System (IWCS) is a system of underground pipes and lift stations used to collect the wastewater from the various base processes...and work areas for treatment at one centralized Industrial Wastewater Treatment Plant (IWTP) located in OU C McClellan AFB. Most of the system is
Installation Restoration Program. Stage 1. King Salmon Airport , King Salmon, Alaska
1989-08-29
DESCRIPTION SOILS, SEDIMENTS , SLU_ SOLIDS TREATMENT ] CONSTITUENTS OR CON., SOLIDO /F/CATION, FIXATION" - STABILIZATION AND FIX/ STABILIZATION FORM...are consistently present in site media _il, sediment , surface, and ground-I waters), and are potentially toxic to humans and the eni--ent. Suggested...Seep IV-76 4.1.5.2.3 North Barrel Bluff IV-76 4.1.5.2.4 South Barrel Bluff IV-94 4.1.6 Sediment Investigation IV-94 4.1.6.1 Eskimo Creek Seep IV-94
1990-01-01
There are three above ground storage tanks for the storage of JP-4 jet fuel with ancillary piping, pumps, loading and unloading facilities, and...time daily basis. Workers are present to transfer jet fuel from delivery tncks to the storage tanks and from the storage tanks to fueling trucks...Ground-water flow and contaminant migration at Site 4, the fuel storage area, is generally toward the drainage ditch located immediately north of the
1988-11-01
Light gray NB, clayey (kaolin). Poetv al - quartz mad to fine sand, mod. (0 Locking Cap plastic , saturated. 3 COMPILED BY B. Painter (EWM) t DATE 11-21...Painter (EUM) -SAMPLE PNTAINSOIL DESCRIIPTION COMMENTS ZTEST NAME. GRADATION OR PLASTICITY ,. DEPTH Of CASING, W ~ 1NPARTICLE SIZE DISTRIBUTION. COLOR...L. Grayish orange 10 YR 7/4. quart. RNDEVAI: very tine Sandy clay, dense, DIAMETER: 2-inrh Srhe So PVC moderately plastics dry. DEPTH: 2 - fenot[ 1
1986-06-01
l C. Review of Weston’s Report .................. IV-8 D. Critical Habitats /Endangered or Threatened Species ....... IV-13 V. CONCLUSIONS...Critical Habitats /Endangered or Threatened Species Discussions with personnel from the Kansas Department of Natural Resources disclosed that there are no...Reticulated Giraffe . This area is upgradient of the base and several miles distant, so it is not thought that the area is affected by past or present
1991-10-01
during the RI; or to provide information for the determination that no further action is required if risks to human and environmental receptors are not...constitute an environmental risk . Exposure media and routes may differ between various organisms due to their physiological and behavioral differences...important species are relatively well documented. U Groundwater 3 Groundwater contaminants may constitute a risk to environmental receptors when
1986-06-15
to their respective areas in the basin to 30 metres at Feather River near Marysville and 15 metres on tributaries to the Feather and Sacra- mento ...Overlain by Arroyo Seco gravels mento Valley. south of the American River. Thickness approxi- mately 100 metres and possibly up to 300 metres along...Communications with personnel from the U.S. Bureau of Reclamation Office in Sacra- mento , however, indicate that there are no major breaches in the
1984-10-01
resulting from previous waste disposal practices at Hancock Field o Recommend measures to mitigatc, adverse impacts at identified contaminated areas o...well GW-8 is downgradient of both disposal sites and this will be the best well to use in judging water quality impacts caused by the disposal...groundwater quality and quantity samples. The amount of water added to each well was in the order of 2 to 4 gallons. This should not adversely impact
1988-04-01
drainageways collect surface runoff at the plant and channel the water off plant property. These are: the Central Drain- age Ditch, the Magazine Ditch, and...past, this drain- age system collected test area deluge waters , small spills from test- ing areas, and drainage from around the flush and maintenance...Drain- age Ditch Table 4-2 shows the results of the analyses of two water samples and one soil/sediment sample that were obtained from the drainage from
1984-12-01
Air F~yeb o et or Departmeri1 of Defense Copies of 0tis repon may be purchased from3 National Technical Information Service 5285 Porn Roya’ Road...squirrels and skunks. Raccoons and abert squirrel popula- tions are stable, and beaver populations are declining. Black-tailed prairie dogs and jack...on prairie dog towns, which are not found on the Academy site today. Prairie falcons are rare on the base. Two eyries with four to six birds are
1992-04-15
an ofcial endorsement or approval of the use of such commercial products. This report may not be cited for purposes of advertisement . "EngineersM M7...Logs Appendix C. Laboratory Results of Soil Samples Appendix D. Concentration of Contaminants vs . Depth in Soils Appendix E. Lithologic Profiles of...dramatic difference in concentrations of explosives in areas outside the lagoons vs . concentrations beneath the lagoons. The results confirm that ES-I
1982-12-01
Base 6-26 17 Confirmation Stage Soil PCB Data, Building 112, Griffiss Air Force Base 6-27 18 Analysis of Roof and Oil Samples Building 112, Griffiss...Chlordane Application 46 52 (14) Drywell, Building 219 46 36 (14) PCB Spill at Floyd 46 47 17 Hazardous Waste Storage Area, Lot 69 38 47 18 Waste Oil ...specific anions, oil and grease, pH, and specific conductance. * Prepare a field investigations report delineating the nature and magnitude of
Installation Restoration Program. Phase I. Records Search, Brooks AFB, Texas
1985-03-01
decay of the cadavers occurred. The waste was packaged in plastic bags, placed in seven 55-gallon drums and buried in a hole 7 to 8 feet deep. The drums...Receptors subscore (I x factor score subtotal/maximm score subtotal) 44 - II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity...subtotal) 44 II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity, the degree of hazard, and the confidence level of the
Installation Restoration Program. Phase 1. Records Search Andrews AFB. Maryland
1985-06-01
red to silvery-qrey, functions ma a conf ining bed. Formation. ~Va plastics thin lonses of pole gray silt. Ann"a Formation. ye (0-210 sand, qrsenieh...the Nanjemoy Formation (a clayey glauconi- tic sand, two to thirty feet thick) and the Marlboro Clay (a plastic clay with silt partings, two to... plastics , empty 55-gallon drums, waste lumber, tires, pipes, and hospital wastes such as unused needles and chemical reagents. In the past, Site D-4 was
1985-08-09
chemicals from the sample, thereby preventing any effects on sample chemistry and cross-contamination of subsequent samples. The laboratory quality...14 Top 3011 4 16 1 Ca 1 ch4DChief ’aquifer (water-ticurinr 16 69 53 i Lrowm clay fo.mation) L 69 1 74 5 . atar oaandand ,ravei from..0.to .750. 74 1 127...significant fraction of the Chemistry Department’s work involves data processing. Mathematical models, based upon analysis of standard solutions or
Installation Restoration Program Records Search for Mather Air Force Base, California.
1982-06-01
Board, Central Valley Region Sacramento, California Mr. Stan Phillippe, Mr. Tom Pinkos, Mr. Bob Matteoli, Ms. Liese Schadt, Mr. Gregory Vaughn 916/ 322 ...Grant Ardell 916/ 322 -7166 7. California Department of Fish and Game Sacramento, California Mr. Jack Linn 916/355-7030 8. U.S. Fish and Wildlife Service...34 " A23 " Fire bluea sar.d ... ." ".......443 " S gra vel If additional space is :equired, continue on DWR Form No. 246-Soppement. -ind attach to zesp :sive
1986-08-09
WATER ASSESSMENT PROGRAM AIR FOsEa PLANT 6, L0CKED-GEOCIA CONPANY MARIETTA, GMO IA PROJECT NO. 611059 WELL 4W-22 WELL 4W-23 WELL MW-24 WELL 4W-25 Dace...PROGRAMo PHASE II--CONFIRMATION/QUANTIFICATION 0STAGE I Final Report for AIR FORCE PLANT 6, COBB COUNTY, GA. U.S. AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL...Con uet on reverse 4 necessary arc .entir’y ay )lcx "UrCer) I;;EL_0 GROUP I SUB-GROuP Air Force Plant , Hazardous materialsI oilS’ DeB Ground water, S
Restoration Advisory Board (RAB) Implementation Guidelines
This document provides recommended procedures for establishing and operating Restoration Advisory Boards (RABs). It is intended as a resource for installation, EPA, and State personnel and citizens who participate in RABs.
1981-10-01
Geography 3-1 Topography 3-. Drainage 3-1 ii Page Surface Geology 3-3 Barrier Sediments 3-3 Myrtle Beach Backbarrier Sediments 3-3 soils 3-5 Subsurface...Beach AFB Surface Drainage and Surface Water Sampling Points 3-2 3.2 Myrtle Beach AFB Surface Soils 3-4 3.3 Myrtle Beach AFB Location of Geologic Cross...has created a potential contamination problem. This situation is compounded by the site’s sandy soil and shallow ground water table. b.) Weathering Pit
1989-10-01
of toluene in the gastrointestinal tract occurs less readily. Toluene is distributed in the highest concentrations to adipose tissue followed by bone...were desorbed using a thermal desorption unit. Samples were injected by a desorber into a capillary column which was followed by quantification with...0.002 beryllium 0.1 0.001 cadmium 0.5 0.005 chromium 1 0.01 copper 1 0.01 lead 3 0.002 mercury 0.02 0.001 nickel 2 0.02 selenium 0.2 0.002 silver 0.5
1989-02-01
contrac: b. Stitt b) Oklahoma L a) Motor housings, junction and switch boxes, ocher a. Arvua o be Avoided electrical equipment I b. Azau to beTreated w...REPORT DOCUMENTATION PAGE ! ,a,,mo i.,e0q 8 1. AGENCY USE ONLY ’ L -ave aianK) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED l February 1989 Final...recommendations for further action. The subcontractor effort was conducted by the following Science & Technology, Inc. (SciTek) personnel: Mr. Tracy C. Brown
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 1.
1987-04-29
Dichlorobenzene 4000.0 U.S. EPA estimate of safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). (2... Plastic bottle 40C 500 ml TOC Glass bottle 40 C; H 2 So4 to pHɚ 250 al Metals Plastic bottle HNO3 to pHɚ 500 ml Volatile organics Glass vial with 40C... safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). 4-3 TABLE 4-2. REGULATORY GUIDELINES OR
1982-03-01
plyethylene PVC landfill- HypalonM PE, CPE, neoprene, EPDM ,* bentqcnite ethylene propylene rubber elasticized polvoleiin 20. A94V C? (Coit" an 0*V" aid...materials include Hyralon®, butyl rubber , EPDM , CPE, neo- prene, polyethylene, polypropylene, PVC8 and elasticized polyolefin. With all of these...and animal and vegetable fats and oils (Geswein, 1975). EPDM , or etiylene propylene rubber , is a terpolymer of ethylene, propylene and a small amount
1991-03-29
laboratory. In addition, weather conditions (i.e., cloud cover, pre- cipitation, air temperature, and wind speed and direction), water clarity, and...carried over a 25-foot grid in this area. The weather at the time of emissions screening was mostly sunny with high clouds . The wind was 3 to 5 knots...TRIBUTARY TO HUTCHINSON CREEK SOIL GOMMIG ANGLED 300 FROM VERTICAL Ae o * SOL. 90011GM VERTICAL 0 100, o SURFACE SOIL SAMPLE AU. VALUES ARE IN mg/Kg MONITORIG
1980-11-01
hr incineration rate are presented in Table 15. These costs include dredging equipment, flat bed trailer and afterburners and venturi scrubbers where...require further treatment before they can be released into the environment, i.e. biological degradation for the liquid and specific scrubbers for the...The wet-air units are equipped with wet scrubbers to remove air emissions. Air emissions are expected to contain at a minimum CO, C0 2 ,N2 , 0, and
The Installation Restoration Program Toxicology Guide. Volume 2
1987-05-01
the number of extra responses made during exposure. An increase in response time 5/87 3V.WI UW V VýWVVWtW’.W1 VWJW.W W W VWVWW.WVVW MRVW W \\V -VW W i Ri...toxicity as shown by a decreased maternal weight gain. Minor anomalies in fetal development included an extra lumbar rib and delayed ossification of... lumbar spurs (57 vs. 18 in the control group) and a delayed vertebrae centra ossification (19 vs. 4 in the control group). No teratogenic response was
1990-01-01
reporting limit. Acceptable RPD in this case is defined as duplicate values within one detection limit of each other. I I I I I I i I i 2567I88-A1...analysis shois the :aboratory to be in ccn:rol. Results for Sa:Dle No. 88092.739 are reported on a wet weight basis, since percen:age moisture was...describes the remedial actions performed on sites confirmed to contain hazardous waste contamination which endangers the human health. The actions
Installation Restoration Program. Phase 1. Records Search, Kelly AFB, Texas
1982-02-01
1000-1500 gallons per year based on two training sessions per year. The ultimate BOD of AFFF ( FC -780B, manufactured by 3M) is 370,000 mg/l in...Landfill 1917-1942 44 24 FC -i Fire Control Training Area ?-1950’s 42 25 FC -2 Fire Control Training Area 1950’s-1981 41 26 RD-i Radioactive Disposal Area...were buried had very short half-lifes. This site received a low score of 45. 6) Fire Control Training Areas a. The Fire Control Training Areas FC -I and
Installation Restoration Program. Phase 1: Records Search, Blytheville Air Force Base, Arkansas
1985-08-01
AFB LOCATION OFI 0 LS U FC MIDDLE S RA EWATER MARKER MONITORING SITESI SL *LEGEND S SURFACE WATER QUALITY IMONITORING SITEI. iJ I WASTEWATER PLANTr j...burning is scored in a small above ground tank located near the FPTA. The extinguishing agent used during this time period was AFFF (aqueous film...receptors, "aste caracte,stics, and pst .ways. Receptors 54 Waste Char’acteristics 54 Pathways 74 Total 183 div~ied by 3 E ’I 3,’osi : --e E. P
1996-03-01
NATIONAL GUARD GENERAL BILLY MITCHELL FIELD AIR NATIONAL GUARD BASE MILWAUKEE, WISCONSIN MARCH 1996 ______ 19960509 134 HQ ANG/CEVR ANDREWS AFB...Report for IRP Site No. 4, Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin - Volume III...Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin, Volume III - Appendices D-I. This is the
Installation Restoration Program. Phase I: Records Search. Sunnyvale Air Force Station, California
1985-07-01
00 a-l Wa-- jzI0 UJ~ *20- * -J J uSl a J~rL 0 9U * de 0~>a j~ ~ W ’./ IL system was also determined to warrant review and modification under the base...in the HARM scoring system to numerically assess the pollutant transport mechanisms and potential receptors present at the site. App. G describes the...Note: RUTA wll field locatiom am dvou in Fig. 3.4-1. SS (EPA, 1964b). tNI. (EPA, 1984). Notle: pci/i - Picocuries per liter. Sources: UIGAEII, 1978
1987-06-01
Each of these sites involves POL releases, detection of which is amenable to geophysical/geochemi- cal methods . ES-8 I A I A I I I I ~ i I I ii I VN...Precipitation in Columbus, Ohio, averages 36.71 inches per year. By calcu- lating net precipitation according to the method outlined in the Federal Regis- ter...spill absorption devices. Fuel that was not recovered either evaporated, was absorbed into the ground, or entered the base drainage system from the west
1988-04-01
sites throughout Alaska, Idaho , Oregon, and Washington, including work at 10 sites on the National Priorities List. Major geohydrologic investigations...Mary’s Hospital, 5300 Military Rd., Lewiston , 278-4000 Hospital Emergetcy Room Niagara Falls Memorial Medical Center, 621 10th N.F. 278-4000 Poison...Hospital ( Lewiston ): Exit AFP 38; head West on Balmer Road; Turn left and head south on State Highway 18; Turn left on State Highway 104 ( Lewiston Rd
1981-07-01
Disposal Methods 4-31 Evaluation of Past and Present Waste 4-35 Disposal Facilities Landfills 4-35 Dry Wells 4-37 Rating of Waste Disposal Sites 4-37 V 2...Problems Identified at GAPE Landfills 4-36 4.12 Priority Ranking of Potential 4-38 Contamination Sources 4.13 -4.31 Rating Forms for Waste Disposal Sites 4...39 -4-76 5.1 Priority Ranking of Potential Con- 5-2 tamination Sources B.1 Rating Factor System B-2 -B-5 4W EXECUTIVE SUMMARY The Resource
1986-03-24
interbedded sands and silts in5 the lower portion of the profile. The sand units within the caliche are gen- erally pink . quartzose. fine grained and...C1426 I- 0 .J C U-I 0 c 0 o .1. 00 44I -14 u -4 >u~ 0i c FloI ~ -r4 ra t-o 14 co 00 z -4 -t cc ’w4t ibe 4-39 C1426 ~-~-~2 o IL _ Cl) 0*l *IJ. *0 0 00 U.U 0
1991-02-01
analysis of water, soil, and/or sediment samples, are required. Careful documentation and quality control procedures in accordance with CERCLA/SARA...I III-1 I I Northern Piedmont * AI Southern Piedmont a’.3 Cahaba Valley... ...... Coosa ValleyI Fall Line Hills Aluvial Plain Black Prairie3 Cu enu e...no surface outlet; (b) A drainage basin or river basin; (c) A low area in the Earth’s crust, of tectonic origin, in which sediments have accumulated
1988-06-15
equipped with an oil/water separator. Separated oil would be collected for reuse or proper disposal, and water would be piped to the Sewage Treatment...1940’s. The STP is located on Glendale Avenue, approximately 2 miles east of the Main Base, and adjacent to the Agua Fria River as shown in Figure 1-7...flow. The effluent from the STP is discharged into a canal that flows into lagoons in the dry Agua Fria River bed. The treated efflu- ent is routinely
1990-05-01
DISSOLVED INORGANIC 4-16 CONSTITUENTS IN GROUNDWATER TABLE 4.1.8 CANCER CAUSING POTENTIAL OF CONTAMINATION 4-18 DETECTED AT ELMENDORF APB TABLE 4.1.9...TABLE 5-34 EXAMPLE CALCMATION OF EXCESS LIFETIME CANCER RISK 5-142 I DUE TO EXPOSURE TABLE 5-35 CONTAMINATION AND RISKS AT SITE IS-1 5-145 TABLE 5-36...sand. They occur on low terraces and in broad depressions . Slopes range from zero to 7 percent. o The Purches series consists of loamy-skeletal, mixed
1988-04-01
Liability Act of 1980 (CE2LA, Public Law 96-510) commonly known as "Superfund". In August 1981, the President delegated certain authority specified...to these wells. Two of these wells are no longer used. The well located about 200 feet southeast of Dilding 96 is listed as a public suply well by the...any organism, either directly fron the enviroamnt or , iirectly by ingestion through food chains , will or may reasonably be anticipated to cause death
1991-02-01
and the Upper Cambrian age Gatesburg formation crop out (Figure 111.3). Specifically, the Station location is shown to be underlain by the Stonehenge ...the Larke formation is generally absent in this part of Centre County, and a hiatus exists between the Stonehenge formation and the underlying Gatesburg...formation. Therefore, the Stonehenge formation exists unconformably in contact with the Mines member of the Gatesburg formation. In addition, the
1994-06-01
Loeltz, 1964, Evaluation of Hydroeeology and Hydrochemistry of the Truckee Meadow Area. Washoe County. Nevada. U. S. Geological Survey, Water I Supply...was detected in water samples collected from all monitoring wells. A concentration of I 0.055 ppm for the water sample collected from monitoring well...MWO8 during the first round of sampling (MW08-(1)), exceeded the federal drinking water standard of 0.05 ppm. The I background concentration for lead
1989-06-01
4) 0) C)-D C 0401 C) 0 -c eL4 CD CD r, r- *,-A (mz61L 00 rC- 4ic 0Cm q) CD) C) -DC DC )C wl ~ ~ ’ %0 0 0 0 koko%04 4 J 4 J I+ C-M 44. 0 4J 44) -) 4...SAC) and 5,6-Dihydro-5-Azacytidine (H5AC) in L1210 Cell Culture Samples by Gas Chromatography (GC) and Mass Spectrometry (MS), C.J. Nielson, S.W
1987-08-01
01 0 4 In w el4 ’ n r fl f4 r, V 0 1" * * * - ~ m ~c- I0 1-0- Q~ 3c 3c~ AdI-. * tp~dip Eu - 4j :: .( - * -U I’ -L - UJ a. Zw a Inc., ɘ L.3. 2-3...swale ap- proximately 100 feet south of Building 222 (Figure 3-7), the Jet Engine Test cell . With the exception of VOC, all param- eters detected at 15-B
1996-01-01
For: HQ/ANG/CEVR Andrews AFB, Maryland Prepared By: ERM-West, Inc. 5111. N. Scottsdale Road, Suite 108 ERM Scottsdale, Arizona 85250 FINAL Document...predominantly andesite and andesite porphyry flow rock, hypabyssal intrusives, and minor siliceous welded tuff, which are commonly represented by the Kate...TERTIARY ROCKSI tuslýýj porphyry and olcomic brii I SOURCE ORNL/ETS. 1994 GEOLOGIC MAP OF THE FIGURE 3-1 RENO. NEVADA AREA 152nd TACTICAL RECONNAISSANCE
1987-09-20
of the two study sites (Appendix D). Common species include the herring and ring-billed gull, mourning dove, tree swallow, chimney swift, purple... Species ................... 111-30 III.G ADJACENT LAND USE .................................... 111-31 III.H SUMMARY OF ENVIRONMENTAL FEATURES...methodology, and a list of acronyms/abbreviations used in this report. 1-4 W- x--WW- -- vqwu UV X DECISION TREE Complete List of Locations/Sites I Evaluation
1987-12-01
protection needs to be changed, then protection will be upgraded, or downgraded, as appropriate. 5 . Cartridges for air-purifying respirators will be...the gloves, the legs taped to the boots, and the hood to the respirator (if appropriate). All openings shall be sealed. 5 . The protective coveralls...placed next to the trash container. Note: Suits are to be removed in an inside out fashion. m. Station 5 - Respirator Removal A rack will be available to
1994-10-01
right side door. To minimize retinal exposure to UV, use UV protective eyeglasses and use the offset dental mirror to read the micrometer 6.7.4.3 To...States Air Force) Volatiles Analysis by GC/MS Method 8260 - (United States Air Force) Organochlorine Pesticides and PCBs by GC/ECD Method 8081...decreasing throughout the three or four exposures . The RSD will sometimes be higher than normal in these cases. Samples that are affected by possible carry
1990-07-01
trobenzen. 660’ ug/KG Phenacet in 6600 ug/KG 2- Picoline 660’ ug/KG Pronamide 10000 ug/KG 1,2,4, 5-Tetrachlorobenzene 660’ ug/KO 0 Denotes instrument...Phenacetin ND 2- Picoline ND Pronamide ND 1,26,4,5-Tetrachlorobenzene -*ND *EPA has not yet determined detection limits for these compounds E-158 I Pr...ND N-Nitrosopiperidine - ND Pentachlorobenzene ND Pentachloromitrobenzene -*ND Phenacetin ND 2- Picoline ND Pronamide - *ND 1,2,4,5
1985-10-01
bromochioromethane. 2-bromo- 1 - 8.2.3. check standard containing each parameter chloropropane . and 1.4-dichlorobutane is 8&.2 Beginning with Section...Modification 1 (IRP Stage 1 , Otis ANGB) Roy F Weston Attn: Pete Marks Weston Way West Chester PA 19380 1 . The Goverment is contemplating assignment of the...delivery order described in Atch 1 hereto under the subject contract, Pertinent details are included in Atch 1 and herein. Request Contractor
1989-01-01
Number DAAK- 1 1 -85-D-007 Report Number CETHA-TE-CR-89006 January 1989 Prepared for: COMMANDER, U.S. ARMY TOXIC AND HAZARDOUS MATERIALS AGENCY Aberdeen...UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include Security Classification) - Biodegradation of DIMP...TYPE OF REPORT 113b. TIME COVERED 114. DATE OF REPORT (Year, Month, Day) 15. PAGE COUNT Final I FROM 1 /87 TO_1/89 1989 January 30 6. SUPPLEMENTARY
1991-11-01
R A DIA N.... cCELA AFB CALIFRNI55259......... ... RADIAN C 0 37 54 0 z is T 1 0 10395 Old Placcrvillc Road Sacramcnto, CA 95827 191461362-5 H3 2...SAME AS r __ OTic usERs Undlassified 22a. NAME OF RESPONSIBLE INDIVIDUAL 22b. TELEPHONE oncoude Area Code) 22c. OFFICE SYMBOL Mr. P. Haas 1 -800-821...Page 1.0 INTRODUCTION .................................... . 1 - 1 2.0 SITE DESCRIPTION .................................. 2- 1 2.1 Type of Facilities
1988-03-01
AFP 59 SW-4 Production Field Blank Water Well Water Hart 004 Water Hart 005 f Hart 007 H.3-13 PRINCETON TESTING LABORATORYI 3v~ zANA -YS--S REDO:’- =I...observations. Enforcing the "buddy system" where appropriate. " Determining and posting locations and routes to medical facili- ties, including...poison control centers; arranging for emergency transportation to medical facilities. " Notifying local public emergency officers, i.e., police and fire
Installation Restoration Program. Stage 3. McClellan Air Force Base. Quality Assurance Project Plan
1990-03-01
Dibromomethane 5.0 trans- 1,2-Dichloropropene 5.0 1,2-Dibromoethane 4.8 total- 1,4-Dichlorobutene 2.6 Methyl methacrylate 28 1,1, 1,2-Trichloropropane 3.9...trans- 1,2-DCE); • Methyl ethyl ketone (MEK); • Carbon disulfide; • Dichlorobenzene; * Chloroform; and * Methylene chloride. Contaminants reported in soil...2-Hexanone 10 4- Methyl -2-pentanone 10 Tetrachloroethene 4.1 1, 1,2,2-Tetrachloroethane 5.0 Toluene 5.0 Chlorobenzene 5.0 Ethylbenzene 5.0 Styrene 3.0
Installation Restoration Program Records Search for McChord Air Force Base, Washington.
1982-08-01
responsible for smoke testing for possi- ble outlets. g ŕ 115 0 V -j q * REFERENCES * .4 g SI * I w I WI j EU REFERENCES Brandin , R. M., and S. Sgt. S. A...Ms. R. Brandin . Griffin, W. C., et al. 1962. Water Resources of the Tacoma Area Washington. Geological Survey Water Supply Paper 1499-B. Prepared in...MEMBERS vS U STEVEN R. HOFFMAN Education B.S., Civil Engineering, South Dakota School of Mines and Technology, 1971 Experience - -. Mr. Hoffman is a
1989-10-01
Coord: Elev.PROTECTIVE CSG He~qht I Material /Type El e~. ________Diameter Elie.hI____ Depth BGS ___________Weep Hole (YIN) HSe.ht __ GUARD POSTS (YIN...Tremied I Y/14) SCR EE N Type Dimeter - --Slot Size Ck Type SUMP (YIN) Interval OGS Lcngth - 90tt0m Cop (YIN) BACKFILL PLUG Material ...for transport to the laboratory. The remaining liners will then be extruded and the material used for lithologic description and other analyses. The
1987-10-01
about 3 inches thick. The subsoil is light yellowish-brown, fine sandy loam, 25 inches thick, under- lain by a buried subsoil of brown clayey loam, 17...inches thick and brown very gravelly sandy loam to 60 inches or more. Fine lime filaments occur in the . buried subsoil. Permeability of the...18 Paq * 2 of FU. PATHWAYS factor taximum, p Rating Factor Possble Rating Factor (0-3) Multiplier Score Score A. If there is evidence of migration of
1986-10-01
investigate the environ- mental feasibility of disposing of flue gas desulfurization (FGD) wastes, ash ’’p and sludge, from a mine mouth power plant by...Department of Defense o EMP - Electromagnetic Profiling o EPA - Environmental Protection Agency o GC - Gas Chromatography o GC-MS - Gas Chromatography-Mass...IN ITEM NO.) ADDITION 01 DELETION CODES: 0 -INTERMEDIATE CIRR: CONTROLLED ITEM RPT ROMT AFSC oRM 705 PREVOIJ EOTO’ , RE U C-4 4rsc-Aad.r IF ,,d 0,P E
1985-08-09
and regulations. Additional hazard areas refer to non-regulated operations and/or practices that pose potential risks to human and environmental ...ORGANI1A’iON REPORT NUMPERASE IRP-IIa-AFP6 64 xAfi OF PEROING ORG IS ZArTON Śo 7a.AM OF MONITORING OAYIZAToN Environmental Science ’ aeedwabi.) U.S. Air...Force and Engineering, Inc ca ed AORESS Y. State, And ZIP C017) AOSS Approvetaoe pblic reease; P. Box ESE Occupational and Environmental Gainesville, FL
1987-12-01
d the location documented on a project site map . c. Split all water , sedi:-ent and soil p~ts as -art of the ccntractor’s specific Quality Assurance...regional/site specific hydrcg.volog-y, -]Il And boring logs, data from water level surveys, grcundwater surface and gradient maps , water quality and...COMMAND COMMAND BIOENVIRONMENTAL ENGINEER (AFSC/SGPB) ANDR-WS AIR FORCE BASE, DC 20334-5000 DECEMBER 1987 PREPARED BY RADIAN CORPORATION 8501 MO-PAC
1987-09-01
these wetlands. Because of the generally low relief at the Base, several manmade drainage ditches have been constructed to improve surface water ...northerly boundary (Hickock, 1985). Within the Marshall Formation, the water table or piezometric surface con- forms somewhat to the land surface. The...34hills" in the water table underlie hills seen on land. The " lows " in the water table coincide with low areas on land (Vanlier, 1966). Thus, the
1982-04-01
128 32. Effects of UV, Ozone and UV-Ozone on the Degradation of Pink Water at Zero Flow ............ ................. 130 33. Formation of...Nitrate Ion During UV-Ozonolysis of TNT in Zero Flow Mode ........ ... ........................ ..... 132 34. Detailed Analysis of Run 7-12...the Degradation of Pink Water at Zero Flow* (Layne et al., 1980) *This figure represents a combination of Figures 5 and 7 in the report. 130 - -+ TNT
1987-05-29
surface soil below the mixing basin at the current Entomology Shop (Building 2560). The concentrations of chlordane found at these two sites is below...surrounding Building No. 440 may have been exposed to pesticide/herbicides from 1965 to 1980 since this site was used to store and mix pesticides used on...ft trench near the three bridges area on Gavin Mandry Road in January 1985. No information is available on what , if anything, was in the drums or when
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the selected remedial actions for the Landfill OU Sites, at the inactive Mather AFB, Sacramento County, California. The Installation Restoration Program (IRP) sites which comprise the Landfill OU at the inactive Mather AFB include: Site 1 - Runway Overrun Landfill; Site 2 - `8150` Area Landfill; Site 3 - Northeast Perimeter Landfill No. 1; Site 4 - Northeast Perimeter Landfill No. 2; Site 5 - Northeast Perimeter Landfill No. 3; and Site 6 - Firing Range Landfill Sites.
Installation Restoration Program Records Search for Richards-Gebaur Air Force Base, Missouri.
1983-03-01
Richards-Gebaur AFB is located on the King anticline, a structural rise favorable for oil and gas production and the oldest gas -producing area in Cass... Oil and Gas Section Chief Don Miller, Ground Water Section Chief 314/364-1752 10. Missouri Department of Natural Resources Kansas City, Missouri Jim...tha uthe United states USMrce sac.. the Ne’lowf Ut of OMVieead this reprt my he rmfau Notsma" I9eb6isuL ?UE service SW~ Partlw Iptbf ll. Yi~taa, T21
1982-09-01
parallei studies ý7.fLtoring TNT and liDX disappearance in laboratory scale (50 g dry weight) and greenhouse (10 kg dry weight) compost,. An additional...occurred during composting. The greenhouse compost studies demonstrated a very rapid decrease in the TNT concentration. At the three week sampling time...material was below the detecuion limit of 16.9 ppm. Greenhouse composting of RDX resulted in a 61% reduction in the RDX concentration after three weeks
1983-06-01
NOTES 19. KEY WORDS (Continue on reveree side if necesaary and Identify by block number) Neoprene Synthetic Liners TCE, XR-5, EPDM Hypalon Compatibility...CPE, Hypalon , XR-5, HDPE, Neoprene, and EPDM ) were immersed in TNT, RDX, and TCE solutions for I week. Liner and test .*. method selection and data...Mean Weight Change Values - EPDM /Neoprene Group 57 Unexposed and in Distilled Water 7 Mean Weight Change Values - PVC Group in Distilled 58 Water and in
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
Evaluation of a concrete pavement restoration project in Virginia.
DOT National Transportation Integrated Search
1994-01-01
The purpose of this Federal Highway Administration Demonstration Project was to evaluate the installation and performance of a section of I-81 in Botetourt County, Virginia, that was rehabilitated by concrete pavement restoration (CPR) methods. The s...
James M. Guldin; John Strom; Warren Montague; Larry D. Hedrick
2004-01-01
National Forest managers in the Interior Highlands of Arkansas are restoring 155,000 acres of unburned shortleaf pine stands to shortleaf pine-bluestem habitat. Habitat restoration consists of longer rotations, removal of midstory hardwoods, and reintroduction of fire. A study was installed in the spring of 2000 to evaluate shortleaf pine regeneration and overstory...
NASA Astrophysics Data System (ADS)
Yarnell, S. M.; Pope, K.; Podolak, K.; Wolf, E.; Burnett, R.
2016-12-01
Due to extensive livestock grazing and widespread removal of beaver and willows, headwater meadows have transformed from multi-thread channels with seasonally active floodplains into single thread, incised channels that store less carbon, retain less water, and are lower in habitat quality for a diverse suite of meadow-dependent wildlife. Meadow restoration techniques often include willow planting and cattle exclosures; however, few studies have rigorously tested the long-term efficacy of these methods or evaluated alternative restoration techniques such as reintroduction of beaver or installation of beaver dam analogues (BDAs). This project seeks to evaluate the installation of BDAs as a restoration technique in Childs Meadow, a heavily grazed meadow in the Cascade Range representative of low-gradient meadows across northern California. Using a before-after-control-impact study design, the study tests the impacts of two restoration techniques (willow planting with cattle exclusion and willow planting with cattle exclusion and BDAs) on hydrology, carbon sequestration, and sensitive species. Results will be compared with measurements in an unrestored section of the meadow that currently supports an active beaver population and two imperiled species (Cascades Frog and Willow Flycatcher). One specific project objective is to measure the response of hydrogeomorphic conditions (e.g. groundwater, surface water, temperature, habitat) and Cascades Frog and Willow Flycatcher to restorative actions. Pre-treatment data was collected in summer 2015, a cattle exclosure was established and willows were planted in fall 2015, and installation of the BDAs is planned for fall 2016. Three years of post-implementation monitoring will be completed to assess impacts of the treatments. Here, we will present our sampling design and first year results following initiation of the treatments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A Problem Confirmation Study was performed at three sites on Mather AFB identified in the Phase I investigation as requiring further study (the Air command and warning Area, the 7100 Area, the West Ditch) and the Northeast Perimeter. The field investigation was conducted from February 1984 to June 1985 and included installation of 11 monitor wells, collection of groundwater samples from the monitor wells and 15 base production wells, and collection of sediment samples from two locations on the West Ditch. Analytes included oil and grease, TOC, volatile organic compounds (VOA), as well as dimethylnitrosamine, phenols, pesticides, and dissolved metalsmore » at some specific sites. Based on the hydrogeologic complexity of the physical setting and the findings of the sampling and analytical work, follow-on investigations were recommended at all three sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Branch, Kristi M.; Bradbury, Judith A.
This article is part of a growing body of literature evaluating public participation approaches and implementation efforts. It compares the characteristics and performance of citizen advisory boards established by the U.S. Department of Energy's Environmental Restoration and Waste Management Program (DOE/EM) and by the U.S. Department of Defense's Army (DoD/Army) as a major part of the public participation programs that were undertaken to help the agencies plan and implement the cleanup of their contaminated installations. We first present the elements of the Acceptability Diamond, an evaluative framework developed by the authors through extensive fieldwork on public-federal agency interactions that identifymore » five objectives of agency/public interactions and public participation programs, and link them to existing literature. We then use the Acceptability Diamond as a basis for comparing the performance of the DOE/EM and DoD/Army advisory boards. In the early 1990s, both DOE and DoD participated in the Federal Facilities Environmental Restoration Dialogue Committee (known as the FFER Dialogue Committee) and were influenced by the Committee's recommendations on public participation. However, the Site Specific Advisory Boards (SSABs) subsequently established by DOE/EM and the Restoration Advisory Boards (RABs) subsequently established by DoD and the Army were governed by significantly different policies and management. We describe some of these key differences and compare the performance of the SSABs and RABs. The article draws on a series of research studies conducted by the authors on the DOE/EM public participation program from its inception in the early 1990s through its transition to accelerated cleanup in 2002 and also on a recently completed study of seven Army RABs.« less
1985-02-20
Surface Cemennt/entonte Grout Rat 20/1 6" Diameter Bore "Ole 8 Foit B.G.S. Bentorito 4" Diameter POes" Schedle 409 Fee S.O.S.PVC Riser Pipe with...Casing with Locking Cap GRiser Pipe StickupGround Surface 2.2Fe Cement/BSentonite Grout Ratio 20/1 8" Diameter Bore Hole cv Ile- 3 Feet B.G.S...Ground Surface 4’. Ground Surface .0~ Cemtert/Bentonlte Grout Rat 20/1 8" Diamneter Bore Hole__ 4" Diameter Pl O Schedule 404 PVC Riser Pipe FetBGS
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1992.
1993-04-02
5. Eielson AFB , AK 24,336 159,535 6. Ellsworth AFB , SD 8,521 63,000 7. Elmendorf AFB , AK 23,227 107,263 8. Fairchild AFB (4 Waste Areas), WA 13,738...HRS Score (Latest) FY 92 FY 92 Status Year AIR FORCE (Continued) 7. Eielson AFB AK 48.14 92 7,055 14,799 FIN 91 8. Ellsworth AFB SD 33.62 91 690 7,831...decided at their October 7, 1992 cleanup decisions at Air Force meeting to recommend the use of . Andersen AFB , Guam installations. As part of the first
Installation Restoration Program Phase 1. Records Search. Air Force Plant Number 36, Ohio
1985-07-01
n >:: FVJl «■^h’-. Kn>»p»y!< fc » wi are exposed on the ground surface. On either side of this valley con- solidated rocks of shale and limestone are...Electric Well No. 3A ( 183 feet deep) completed also in 1951 displayed a water mmmmmmmmi m w\\!wü wUWinntnW VW^^^ft ÄW^F^^’Sr...FIGURE 3.8 3-18 ENGINEERING-SCIENCE IM^N^^C^ xmmmmtttK*KWimmx& ■sm^m^ fc ^^^ level of 56 feet. "Hie differences in water levels indicate the
1990-01-01
DATA job No.: OROOl Calibration Date: 8-19-88 Instrument I.D.: Perkin Elmer 257 Client: ES Oak Ridge Grating Infrared Spectrophotometer Attn: Bill...ilh (2 2 ___ UPPER I LIMIT__ I/ LOWER I0 I 9 I LIMIT_ I -00 I o0 WW2 1EPA SAMPLE] I No. I I I---. ...I I .. .. - ==== =---I 01- J ox.9oJ wqIJ~%o S... Infrared Spectrophotometer Attn: Bill Hayden Address: 710 S. Illinois Avenue Unit: mg/L Suite F-103 Date Reported: 11-09-88 Oak Ridge, Tn. 37830 R
Installation Restoration Program. Phase 1. Records Search, McGuire AFB, New Jersey
1982-11-01
Raritan- Magothy System * 3.12 Log of Base Well OD" 3-23 3.13 Well no. 1 at McGuire Missile Site 3-25 3.14 Base Well Locations 3-26 3.15 Surface Water...in the Potomac-Raritan- Magothy outcrop area has been published. This is not expected to impact base water quality in the near term. o Flooding is not a...Potamac-Raritan- Magothy System (PRM) 3-13 FIGURE 3.7 McGUIRE AFB STANDARD LOG OF McGUIRE PENETRATION. TEST MISSILE SITE I TEST BORING 46 21 DEPTH BELOW
1987-07-01
Raritan Formation and the Magothy Formation. The Raritan Formation, which rests on the bedrock, is subdivided into the Lloyd Sand Member and the clay...member, which is the uppermost part. The Raritan Formation is below sea level. The Magothy Formation outcrops at only a few locations on Long Island...the Magothy , and the Lloyd Sand member of the Raritan Formation. These aquifers are made up of sand and gravel and small amounts of silt and clay
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
1984-11-01
R &D investigations. 1.3 PHASE IV SITE DESCRIPTIONS I Three primary sites are included in this Phase IV...34C z I L . ...- I I E I I i -\\ = _ _ _ . .. .....,. . .. .. I x FIGURE 1.7 a qq"-.. .. .. .. .. .. "- _ r JI I g I I1 ,n I , I I I " I - I Br-.,,-%~l...0 0 4J 4) 44 4) V ) -H 0 4 6: 144 d 0 4 14 404)-4 -4 4 .4 N ) 4 0 4) 4 40 4) 4) 0.0
1986-12-11
MMR main gate (see Figure 3.2-1). In those ponds Umbrella-grass (Guirena-pumila) and Hyssop Hedge- nettle (Stachys- hyssopifolia) were found. The other...has conducted research in Buildings 286 and 240. From 1963 to 1969, the lab tested insecticides for private companies. Residuals from the 4...Airport Turf Insecticidal Treatments for Japanese Beetle and European Chafer, Eastern Region. Stahl, Ralph G., Joachim G. Liehr, and Ernst M. Davis. 1984
1985-09-01
combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane , and 10.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop...Smmmmmmmiih EmmmmmmEEmmmiEEhhE/hEEE/hEEI EEEmmmmmmmlmmE mmmEmmEEmmmmEI mmmmEEmmmEEmmI . AN 11 Igo 12. i,11111 1111 IIII1111l 1.2 IlII1.4 11’ .6 1 ...BASE DAYTON, OHIO AIR FORCE SYSTEMS COMMAND HEADQUARTERS AERONAUTICAL SYSTEMS DIVISION WRIGHT-PATTERSON AFB, OHIO 1 AUGU.$ 985 PREPARED BY ROY F
1990-01-01
Selection of Indicator Chemicals 6-36 6.2.2 Estimation of Exposure Point Concentrations or Emission Rates 6-38 6.2.2.1 Exposure Pathway Analysis 6-38...Exposure Point Concentrations or Emission Rates 6-50 j 6.3.2.1 Exposure Pathway Analysis 6-52 6.3.2.2 Exposure Point Concentrations 6-55 6.3.2.3...Exposure Point Concentrations or Emission Rates 6-62 6.4.2.1 Exposure Pathway Analysis 6-62 6.4.2.2 Exposure Point Concentrations 6-69 6.4.2.3
1989-11-01
at a Superfund site in Puerto Rico to ascertain the alleged extent of mercury contamination. C.C. Johnson & Malhotra. P.C. (1985-1988): Environmental...industrial hygiene and training, as well as other environmental matters. 3 DETOX , Inc. (1986): Manager, Technical Services Responsible for the...computer and CAD operations, and company R&D efforts. DETOX , Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United
1984-09-11
5 EPA 625 . Endosulfan sulfate wg/L 5 EPA 625 Chlordane pg/L * Toxaphene Pg/L * Acid Extractable Detection Analytical Compound Units Limit Method...ND ND ND ND 4,4’-DDT 5 ND ND ND ND Endosuif an sulfate 5 ND ND ND ND Chlordane* Toxa phene* Detection Acid Extractable Compound Limit M4-2 M4-6 14-9 Ge...Endosulfan sulfate 5 ND ND Chlordane * Toxaphene * Detection Acid Extractable Compound Limit BPM-1 BPM-2 2-Chlorophenol 2 ND ND 2-Nitrophenol 2 ND ND
1990-01-01
1-20 1-6 Sites Defined and Ranked During IRP Phase I Study. 1-29 1-7 Aerial Photograph of Site 2, April 1988. 1-32 1-8 Site 2 Sampling Locations...Utilized During Phase II Investigations. 1-35 1-9 Aerial Photograph of Site 3, April 1988. 1-38 1-10 Site 3 Sampling Locations Utilized During Phase II...Investigations. 1-47 1-11 Aerial Photograph of Site 4, April 1988. 1-54 1-12 Site 4 Sampling Locations Utilized During Phase II Investigations. 1-57 1-13
1989-09-01
STEEL STL STEEL TFL TEFLON TIL TILE WD WOOD WRI WROUGHT IRON Z OTHER A-14 coam Bc~ai=L a TEST PIT ois rn iEI AR AIR - ROTARY 8 BORED OR AUGERED C CABLE-TOOL...CO CORING Cs CHILLED SHOT D DUG DH DOWN THE HOLE HAMMER HA HAND AUGERED HS HOLLOW STEM AUGER J JETTED MR DIRECT CIRCULATION ROTARY , MUD p AIR ...INSTITUTE WARI WATER AND AIR RESEARCH. INC. WIL WILSON AND CO. A-18 M 0E 7 PIT E V/n.. CK: N’Y ESCI ENGINEERING -SCIENCE NA NOT APPLICABLE RB MR
1987-10-01
3 I, UNLSSflD r/ H : . ,_ .m 0 1 -8 111 . ! m m’" , L . I-~*211111220 MICROCOP RESOLUTICN TEST CHART NATIONAL BUREAU 0I SANDARD ’l l 4 AtJLLW i V...include, but not be limited to, any element, substance, compound , or mixture, including disease- causing agents, which after release into the environment...under: (a) any substance designated pursuant to Section 311(b)(2)(A) of the Fed-- eral Water Pollution Control Act, (b) any element, compound , mixture
1986-03-07
8217 CLS7 PA SPOONER ET AL, 87 MAR Big F/G 12 11111g 1.0 03,2 i 1111111L_ MICROCOP RE ION TEST NATtnNAL HURLAIl )IF SIANDAPFrl £, , , 11 11I% AD-A 171 579...North Gate - ’FPT-?\\ Sal) West Gate ,o > e-.? ! •• ai Bouganville \\>°( ,, FigreES-. ocaio of SiesI etgae CE Storagje Compound SP1 SP-7 - FPTA-3...determine the areal sample and analyze for extent of groundwater target compounds identified contamination. in 1-9 (or for volatile organics using EPA
1986-04-30
Si 35 Areas E and J Waste Disposal Sites and IRP Phase II Monitoring Well Locations ^ 36 Areas F and H Waste Disposal Sites and IRP Phase II...4 oMe c hy 1 - 2 - Pen eeaocie lephchelene 1.2- Trene Dlchloroechyle 1,1,1-Trlchloroechene Toluene Tinyl Acftcete H.P-Xylene 0-Xylene ACIDS AW) OTMEKS...4) a. > n k. Q 41 ^ 0 oca Li »I 4) M 41 X C (B w < G a. v 1 m M ! Si 118 swe Table 16 TOTAL AND SOLUBLE HEAVY
1990-09-01
Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using
Installation Restoration Program for Eglin AFB, Florida. Phase 2. Field Evaluation
1984-09-01
of t jest l-iianja-erent pra-ct ices w .hien are discussed in Section D.5 5.1.4 Landfill L)-26 In Dotn NoveM( Der and tebruary samplI igs, ioX" results...to analy.ze 6rounawater samp los tronm La’nd ti I v)-ZIt for organional I ides in the base/ neut ral extractaLeI, organics section of the priority...the gasoline tank was not filled near wells or the van and any spillage was allowed to evaporate before moving the pump. During use, the pump was
1988-12-01
nuclear disintegration of certain elements and isotopes, with the emission of radiation, radiant energy capable of affecting living tissue. RADIUM - A...Corrosion Control. Waste oils, recovered fuels , spent cleaners, strippers, and solvents are * generated by these shops. ES-i mIs- Interviews with past...HAS-73) A defueling pit is located north of the old alert hangar (Building No. 241). Excess JP-4 fuel in the F-100 aircraft was dumped into the pit
7 CFR 1467.10 - Cost-share payments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... restrictions on the costs of establishing or installing conservation practices or activities specified in the... easement, 30-year contract, or restoration cost-share agreement, NRCS will offer to pay at least 50 percent... entity may receive, directly or indirectly, for one or more restoration cost-share agreements, for any...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...
US army land condition-trend analysis (LCTA) program
NASA Astrophysics Data System (ADS)
Diersing, Victor E.; Shaw, Robert B.; Tazik, David J.
1992-05-01
The US Army Land Condition-Trend Analysis (LCTA) program is a standardized method of data collection, analysis, and reporting designed to meet multiple goals and objectives. The method utilizes vascular plant inventories, permanent field plot data, and wildlife inventories. Vascular plant inventories are used for environmental documentation, training of personnel, species identification during LCTA implementation, and as a survey for state and federal endangered or threatened species. The permanent field plot data documents the vegetational, edaphic, topographic, and disturbance characteristics of the installation. Inventory plots are allocated in a stratified random fashion across the installation utilizing a geographic information system that integrates satellite imagery and soil survey information. Ground cover, canopy cover, woody plant density, slope length, slope gradient, soil information, and disturbance data are collected at each plot. Plot data are used to: (1) describe plant communities, (2) characterize wildlife and threatened and endangered species habitat, (3) document amount and kind of military and nonmilitary disturbance, (4) determine the impact of military training on vegetation and soil resources, (5) estimate soil erosion potential, (6) classify land as to the kind and amount of use it can support, (7) determine allowable use estimates for tracked vehicle training, (8) document concealment resources, (9) identify lands that require restoration and evaluate the effectiveness of restorative techniques, and (10) evaluate potential acquisition property. Wildlife inventories survey small and midsize mammals, birds, bats, amphibians, and reptiles. Data from these surveys can be used for environmental documentation, to identify state and federal endangered and threatened species, and to evaluate the impact of military activities on wildlife populations. Short- and long-term monitoring of permanent field plots is used to evaluate and adjust land management decisions.
2007-11-01
INSTALLATIONS IN THE CHESAPEAKE BAY WATERSHED IDENTIFICATION AND CONTROL METHODS Cogongrass ( Imperata cylindrica ) Description & Biology – A large...Crown vetch Coronilla varia MD, VA 14 Leafy spurge Euphorbia esula VA 15 Ground ivy Glechoma hederacea DC, MD, PA, VA, WV 17 Cogongrass Imperata
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashwood, T.L.; Spalding, B.P.
1991-07-01
This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less
1988-01-01
the reactor Duties: The Process Engineers rotate with the Lead Operator to monitor the process at the top of the reactor through the site glass...pant cuffs and coverhoods of coveralls, will be attached to gloves, boots and coveralls, using duct tape. * IF AMBIENT WORK STATIONS TEMPERATURE IS...L of the sample fortification solution (Section ýý8) containing 1C 12-2,3,7,8-TCDD at a concentration of 0.5 ng/1,Land C14-2,3,7,8-TCDD at a
1988-10-01
SETTING. .. .. .... .... .... .... .... -1 A. Meteorology .. .. ..... .... .... .... ....... -1 B. Geology .. .. ..... .... .... .... .... ..... -1 C...2a.’~1 quadrangles, San Lcto a fte16hTG uroRcJuan and Carolina, Lcto a fte16hTG uroRcPuerto Rica . Air National Guard, San Juan, Puerto Rico.3 Boca de...precipitation in this area is negative 27.8 inches per year and maximum rainfall intensity is approximately 9 inches. B. Geology Puerto Rico is the
1988-03-01
50 BLM - - - in use Oil Well Road 51 63-501 - - - in use 6981st Rec Area Six Mile Lake 52 23-100 166. A 36 in use Golf Course Pro Shop 53 62-145 125...q K, -- p *K. % K.. K.,., ~* K,. .~ A , A .U .AAA.J A A J~...K A. ..A ,.A - . OKIRACoks con 55 ORDER FOR SUPPL) ES OR SERVICES 1 .2 2. PROC...SYC/AGENCY tt.SURV 20. TOTAL AMOUNT~CeNT USE CRIT A. PST a CONRACTADMIN A. ASTU CNTRCT C. ARSTNAC? RECIP 0. SPL CON ? FuEC PAT It KNDN 421 TYPE ASP
1986-06-01
SAC Strategic Air Command sedimentary Describes rocks resulting from aepo- sition of transported material that has accumulated in layers semi-confined...provided in a separately bound appendix to the draft final report. L. Meetings The contractor’s project leader shall attend two meetings, to be he_...I ’~’UO’’ I. - P P I--D Q P22PPP~b ~QPZ _’P- bPP ?Pf tnN -7-p (1)N Ir-J -1 0 (D u-iU v u AD-A184 581 INSI~A LLATION HISTORATI ON PRO ~AM PHASE 2 7CON
1988-11-01
BENZIDINE 400 81)1 5 BENZO (a) ANTHRACENE 400 ODL 6 BENZ0 (a) PYRENE 400 61 )1 7 BENZO (b) FLUORANTHENE 400 61 )1 a BENZO (ghl) PERYLENE 1003 61 )1 9...BENZO (k) FLUIORANTHENE 400 61 )1 10 815 (2-CHOROEThOXY) METHANE 400 81)1 11 815 (2-CHOROETIIYL) ETHER 400 BDL 12 8(5 (2-CHLOROISOPROPYL) ETHER 400 BDL 13...CHOROPHENYL PHENYL ETHER 400 61 )1 18 CHRYSENE 400 B1)L - 19 DIBEIQO (ah) ANTHRACENE 400 81)1 20 1,2-DICHOROBENZENE 400 81)1 21 1 ,3-DICHLOROBENZENE
1986-09-01
0’ - N tT qT -0 t" C-r C-, M z a <CLW 4 0 a. o.CL- C= un z LJJIIr-= r -I CiA c= cot ’ rcli LAJI LUU CLCL LLI- IOUa a. IF LLJLm I-l - ( Cft - 4 CL...Depth Graphic Core Sample Sample Cft ) Log Interval/ID Taken* Lithologic Description 0- .. ~.G TOPSOIL; with some wood and other debris. 5-.~J SB-lA-1 ST...Date Recev 7 T ime~ L Transported By La- aml No. 0,; 0 Comments_____________________ ________ ___ Inclusive Dates of Possession
1988-06-15
Primary Metals: CA Title 2:60 e Arsenic 0.005 mg/L~~ Barium 0.005 mg/LICadmium 0.005 mg/L Chromium 0.01 mg/L Lead 0.05 mg/L Mercury 0.001 mg/L Selenium...analyzed for twelve metals: arsenic (As), barium (Ba), cadmium (Ca), chromium (COr), lead (Pb), mer- cury (Hg), selenium (Se), silver (Ag), iron (Fe...Total Threshold Limit Substnce (mg/L) (mg/Kg) Arsenic 5.0 500 Barium (excludingf barium sulfate) 100 10,000 Cadmium 1.0 100 Chromium VI 5 500 Chromium
1985-07-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...described in Section 7. 2-bromo- 1 - chloropropane , and 0.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop 14-dichlorobutane is...46 UNCLSSIFIED F/G 13/2 UL mhmmhmhohEEEmhI wJI. 1.0S ’, LI U.2..12.2 1 . 111110 MICROCOPY RESOLUION ES CHART""., -6 -’S- . 1 °"°, 5- -i -1.0..-+-’.2,i
1993-12-01
porphyry intrusives that crop out along the northeast and southeast shores and locally inland. Bedrock lithology is only rarely described in the borehole...kg). Groundwater samples contained arsenic (62.8 mg/L to 66.9 mg/L), chromium (19.2 mg/L to 80 mg/L), copper (52.9 mg/L to 255 mg/L), zinc (163 mg/L...0.17 mg/L; nitrate/nitrite ranging from 0.038 mg/L to 1.41 mg/L; copper at 9.6 pg/I; zinc at 13.3 pg/L; and bis (2-ethylhexyl) phthalate at 1 /ig/L
1991-07-01
Systems Audits ; Preventive Maintenance; Data Assessment Procedures; Corrective Action; Quality Assurance Reports; and Site Management. General Data Quality...for verification and quality control audits . A copy of the QAPP will be in the possession of field sampling teams for all sampling efforts...L cc- acca C wi w-C P-3-- C I- usu 2; - at C4~~2 Q (( c ccc c-c C- 0L U -C 3- au S - - C3 . - acu tr - -a CL.43 C LU -C2 -C ul 0it S w- -C u Ocw - z i
1994-04-01
N F-67 PROJECTt REINO AZR NATIONAL GUARD DATE:03/25/94 ANALYSIS: BNA - CONTANINATZON REPORT REVIEWER: DENNIS MART27...10SS 0.569 0.7021 -23.4 T 12/14/92 2259 CRIoemmA 3 loSS 0.027 1.011 -22.2 T 12/14/92 2259 DIO 1055 l 0.703 .0.11 -22.5 T 12/14/92 2259 NTUL= CULORIDS...seetma. rule VOL DIo -U-T...z..-- 1064 1055 Perocnt D in the Coatcal ezood limits. wa 1064 10ss The ouaes.. does not met 52/102 no contemin. rule NIT
Installation Restoration Program. Phase 1 - Records Search, Travis AFB, California
1983-08-01
Personnel Transportation Assistance Office Navy Construction Office (ROICC) Navy Quick Trans CPE Cargo OL-K AFESC/CEMRT OL OH AF Commissary/ FCS Operating Loc...du u U C AS I- z I- < L z Z ’CIA F,.- **z z - C -o -C Z. -2 X.,~a S.. ’ l - x CO I II I EAI IIV I - -. I t1 -1 z In-’S I LA- 0..u 2gU, 0 z u Fc -jIL...used at the site comprised, AFFF , protein foam and water. The site has no berms or dikes to contain the runoff. Surface runoff from the site has to
Installation Restoration Program. Phase 1 - Records Search, Castle AFB, California
1983-10-01
2 WAEEESnm vl-dddwd. ,de~, ~~~~~S.’. 4.. fC . 4h.1 Ff* To n 4w .64w Sim. .23 " -ta. fqU % . V.int i. few I. i& xi & T s - -f - R //5 . " T...iaaPa 1 l] 4 W. 0. 2162 W=L NO. 34-A Atwater District NW* of Section 6-7-13 Drilled by No I.D. December 194 0 - 5 Soil 541 or 18" #14 Ga. Double...Air Force Base. AFESC: Air Force Engineering and Services Center. AFFF : Aqueous Film Forming Foam, a fire extinquishing agent. *APR: Air Force
1987-12-01
Limit Spiked Samale Samole ISailced C" auod R sIus’lt (SSR) esult. (SR) A-dded ( .SA) Iels: I. I 1. A.luminum 75-125 - I Z. Antimony - 3. Arsenic " I...UntKtarix *s %Control Limit Spiked Samale Sample SieiCm.,ound _ _R R esult (SSR) Re t,.- (SR) Added (SA) Z,10 1. AUlunu m 7 I I I 2. Antimonyj ____ 3...No. DATE Lab Sample) ;S4 No Katrix waot, " . n ...Central L imi Spiked Samale Samale Spiked Comnpound M Rsult: (SSR) Result (SR) jAdded (SA) XR
1990-01-01
Migration 5-7 5.2.3 Contaminant Persistence 5-8 5.2.4 Contaminant Mobility and Migration 5-9 5.2.4.1 Contaminant Migration in Surface Water 5-9...of Contaminant 5-11 5.3.2 Potential Routes of Migration 5-11 5.3.3 Contaminant Persistence 5-12 5.3.4 Contaminant Mobility and Migration 5-13 5.3.4.1...Contaminant Mobility and Migration in Soil 5-18 5.6 CONTAMINANT FATE AND TRANSPORT 5-18 AT SITE 10 5.6.1 Summary of Contaminants 5-18 5.6.2 Potential Routes
Installation Restoration Program. Phase I. Records Search, Air Force Plant 44, Tucson, Arizona.
1985-10-01
Biographical Data APPENDIX B List of Interviewees and Outside Agency Contacts APPENDIX C Master List of Industrial Shops * APPENDIX D References APPENDIX E AF...Collected by the Tucson Groundwater Contamination Study Task Force * Annual Generator’s Reports and Quarterly Reports from AFP 44 to ADHS. Appendix D ...cn (INcC. iU u u a L- - -2 a 0 0) CL C 1-4~~ ~ r % %- d ’ 00 A to did 1-44 L0 47% 0 z- d Ci - Z ..-i I2-8 00 -4 40 0 -0 0j c 0 Sb. 1.- 41 CL "-4 CLV
Ten years of oak restoration in city of Walnut Creek open spaces
Ralph Kraetsch
2002-01-01
The Oak Habitat Restoration Project began in 1991 when several individuals recognized that the oak woodlands and savannas of Walnut Creek's nearly 2,800 acres of open spaces had little natural regeneration. This group gathered volunteers who harvested acorns, planted them, and then installed tree shelters and watered the resulting seedlings. The Project soon...
Restoration planting options for limber pine (Pinus flexilis James) in the Southern Rocky Mountains
A. M. A. Casper; W. R. Jacobi; Anna Schoettle; K. S. Burns
2016-01-01
Limber pine Pinus flexilis James populations in the southern Rocky Mountains are threatened by the combined impacts of mountain pine beetles and white pine blister rust. To develop restoration planting methods, six P. flexilis seedling planting trial sites were installed along a geographic gradient from southern Wyoming to southern Colorado. Experimental...
{Interball-1 Plasma, Magnetic Field, and Energetic Particle Observations}
NASA Technical Reports Server (NTRS)
Sibeck, David G.
1998-01-01
Funding from NASA was received in two installments. The first installment supported research using Russian/Czech/Slovak/French Interball-1 plasma, magnetic field, and energetic particles observations in the vicinity of the magnetopause. The second installment provided salary support to review unsolicited proposals to NASA for data recovery and archiving, and also to survey ISTP data provision efforts. Two papers were published under the auspices of the grant. Sibeck et al. reported Interball-1 observations of a wave on the magnetopause with an amplitude in excess of 5 R(sub E), the largest ever reported to date. They attributed the wave to a hot flow anomaly striking the magnetopause and suggested that the hot flow anomaly itself formed during the interaction of an IMF discontinuity with the bow shock. Nemecek et al. used Interball-1's VDP Faraday cup to identify large transient increases in the magnetosheath density. They noted large variations in simultaneous Wind observations of the IMF cone angle, but were unable to establish any relationship between the cone angle variations at Wind and the density variations at Interball-1. Funds from the second installment were used to review over 20 proposals from various researchers in the scientific community who sought NASA support to restore or archive past observations. It also supported a survey of ISTP data provisions which was used as input to a Senior Review of ongoing NASA ISTP programs.
Vroblesky, Don A.; Casey, Clifton C.
2007-01-01
The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.
Restoration of Aspen-Dominated Ecosystem in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2001-01-01
A reserve tree method(RTM)of harvesting was installed in six 70-to75-year-old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
Restoration of aspen-dominated ecosystems in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2000-01-01
A reserve tree method (RTM) of harvesting was installed in six 70-to75-year old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
Restoration of aspen-dominated ecosystems in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2001-01-01
A reserve tree method (RTM) of harvesting was installed in six 70- to 75-yearold aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
2009-06-01
155 SECTION II: PREVENTING RECURRING INVASIVE SPECIES AND RESTORING HISTORICAL PLANT COMMUNITIES ...Wilcove et al. 1998, Westbrook et al. 2005). Beyond degradation to ecological communities , invasive species can threaten human health and cause...recurrence of problem invasive species. This section also gives recommendations for returning management areas to historical native plant communities
NASA Astrophysics Data System (ADS)
Knox, S. H.; Sturtevant, C. S.; Oikawa, P. Y.; Matthes, J. H.; Koteen, L. E.; Anderson, F. E.; Verfaillie, J. G.; Baldocchi, D. D.
2014-12-01
The new generation of open-path, low power, laser spectrometers has allowed us to measure methane (CH4) fluxes continuously in remote regions and answer new and exciting questions on the spatial and temporal variability of greenhouse gas (GHG) fluxes using networks of eddy covariance (EC) towers. Our research is focused in the Sacramento-San Joaquin Delta where we have installed a regional network of flux towers to assess the impacts of land-use change and ecological restoration on CH4 and CO2 fluxes. The Delta was drained for agriculture over a century ago and has since has experienced high rates of subsidence. It is recognized that agriculture on drained peat soils in the Delta is unsustainable in the long-term, and to help reverse subsidence and capture carbon (C) there is an interest in restoring drained land-use types to flooded conditions. However, flooding increases CH4 emissions. We conducted multiple years of simultaneous EC measurements at drained agricultural peatlands (a pasture, a corn field and an alfalfa field) and flooded land-use types (a rice paddy and 3 restored wetlands) to assess the impact of drained to flooded land-use change on CO2 and CH4 fluxes. Since these sites are all within 20 km of each other, they share the same basic meteorology, enabling a direct comparison of differences in the C and GHG budgets between sites. Using a multi-tower approach we found that converting drained agricultural peatlands to flooded land-use types can help reverse soil subsidence and reduce GHG emissions from the Delta. Furthermore, there is a growing interest in wetland restoration in California to generate C credits for both the voluntary C market and the state's cap-and-trade program. However, information on GHG fluxes from restored wetlands is lacking. Using multi-year measurements of GHG fluxes from restored wetlands of varying ages, our research also aims to understand how CO2 and CH4 fluxes from restored wetlands vary during ecosystem development, determine the daily and seasonal forcings controlling these fluxes, and assess management strategies that can help minimize CH4 fluxes and maximize C uptake in restored wetlands. Our multi-year multi-site research program is beginning to answer these questions and bridge understanding between biometeorology, biogeochemistry and climate policy.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kamp, G.; Regan, P.; Ninesteel, R.
1988-01-01
Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less
1990-06-01
portions of the master plan and preliminary engineering for a new international airport for Lisbon, Portugal , estimated to cost $250 million. Self... sinES awtuc, SiC,9 @, Sta. 0.4.. Loc.’ el v t tim w . made weet of 66 water to. dril Sl thr0 g concrete.~ oa~~ 4.80 L0051 1.450, a. Di caes"J @tknwe...8217:par-i SI17. lilt)*~ fir, Sai~d. irav nir 1 ,l 111.-li 1s -w-i-l, a 6-Inch lent, Of coals ,- t. tint SANUI. li1tle Silt l(ll) GFIAPNhf SISCCULI/ O REMAR
1981-10-01
Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-10-01
The purpose of this task is to determine if environmental contamination has resulted from waste disposal practices at Otis ANGB MA; to provide estimates of the magnitude and extent of contamination, should contamination be found; to identify potential environmental consequences of migrating pollutants; to identify any additional investigations and their attendant costs necessary to identify the magnitude, extent and direction of movement of discovered contaminants. Partial contents include: well and test pit logs; site safety plan; laboratory analytical methods and quality assurance; and Federal and state drinking water and human health standards applicable in Massachusetts.
1987-02-20
Dnor:)c7i’,orotneane .0i fN D____ __I______ C,-icniorcetnyene 0.10 N:DO.02 ____ ____ ____ I n1 ic o cni e -i - ---ii 1- - - 1 Di c roreae_____...n -c 0a r~e~n’ 0.010 NDɘ.010 _____ --- H I().01-0 1z0 0 c ND 7*, 5 was nUJVC.. ceteize ; the _ _ limit__ of deec iofrhiaalsi i _____ ,a t- s-Ie...PASADENA CALIF 20 FEB 87 U N LASF IE F31615-84-D -448 2 F/G 24/7 M N1 . - 1111_1 % . .- 1511 1*% EncineerinQ Science Page 11 ANALYTICAL RESULTS SUMMARY
1990-04-01
j Client’s I.D. I Cont. I Cont. Deec . I Comments • Sample Condition 4,4~ , 4 I I a I * a a I By Tm : ReevdB:- ie By: Tm:RevdB: TieUI M ___ _. _ a...tLa* 0 0 0 0 -T 0 0 N1 f4" V-t %D C9 -t t Cri’,O~~t In! CAlr In- I n-. I - ul 0 0 w 0 w-w V al IL) ., 0-4 0w~ S -4 bO 1 r- -4 u w u GD 0. &, -4 M to 4
1985-08-09
FL UNLSSIFIED C R NEFF ET AL 99 AUG 95 F33615-84-D-4491 F/O 13/2 NLEmhANNE.mmmmhhhhl smhmhhhhmmhhls mhmmhmmhhhhhl...Occupational and Environmental Gainesville, FL 32602-3052 Health Laboratory I Brookq -kir ForrA R"Pn ’’y 1:;~ Sa. NAME OF FUNOINGiSPONSORING 8b. OFFICE...z ul N z~ I. * 4 11 z z 41 ( z a FL - pJ 0 :, w I.. 0 I z. z w \\, Cl) - u zzw JJ 4,..- 4.0 .J.. a A7 0 z I .4-i~ I _ _ __ _ _ C4.. % 0- .1 z IH~ID3M A
1986-12-11
MG/L Chmia Oxyge 00340 ARSENIC 01000 002BORON 0102 Total Ov-gale 00640 BARIUM 131005 01007 BORON. 01020 CARDON as C 0 * Diseelvud 0 1 CADMIUM 01025...Goldenrod) U - Utricularia sp. (Bladderwort) B - Scirpus sp. (Bulrush) h6 - Myriophyllum tenellui (Leafless Mil- H2 - Elodea sp. (Waterweed) foil) n1... Dioxide I - -- -- Arsenic C 10 (10 10 410 ug/L Barium 14200 j( 200 (200 (200 ug/L Cadmium !4 10 ( 10 1 10 4 10 ug/L Chromium ( 50 4 50 4 50 50 ugSL
1985-09-04
health effects was noted in any of the monitor wells. Wells RFW- I , RFW-2A, . and RFW-4, at the Base Landfill, RFW-5 (CFTA) and RFW-10 (PFSA) were...88-D-4006 F/G 24/4 UmEohEEEEEEmiE EEEEEAhEEEEEEEEEEEEEEEEEE EhEEEEmmhmmhhEEE I EEEEEEEEEEEEE 11111 3315 111W12 w ~ ~ ~ ~ d -W w w - v w v w ,!:..4 4...OEHL) Brooks Air Force Ba:;e, Texas 78235-5501• DTIC ECTE October 1935 JUL 0 6 1988 H p.’ DESI CONSULTANTS Approve-. h)r pvhTElMre Volume I - Text " L
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Feasibility Study (FS) Report has been prepared for the Air National Guard Readiness Center (ANORC) under the U.S. Department of Defense`s (DOD) Installation Restoration Program (IRP). The purpose of this FS is to screen and evaluate potential remediation alternatives for IRP sites and areas of concern (AOC) at the Kellogg Memorial Airport in Battle Creek, Michigan that have previously been identified as having contaminated soil and/or groundwater. This FS has been prepared pursuant to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA). Montgomery Watson hasmore » been contracted to prepare this FS report under contract DAHA90-94-D-0013, Delivery Order 13.« less
1992-05-26
resources include those contained within the New Jersey Pinelands, such as cranberry bogs and blueberry harvesting. 2.6 Cultural Resources Cultural resources...settlements which were associated with this industry can still be found. Commercial blueberry production was also practiced in the late 1800s and early...aA mm to m m mm to mm -* ,0 00 0 -- a 00 0o 00v 00 00 00 00 00 dL . L. 0. 0.- o .L .L .L. t . L ff oc oo 3 oc ss c s Io C7C7 (( L -(. ma t . m. On 0a
1984-09-01
a .4 0) V U) co >- 194 .> ~ Ŕ & .4a 0: -0W 4 Cc %0 4 o 1.C " 0 $ 4 4 0 )ON c400 .,4 W 44 V c W0r c 114-4 CU G% * cW 0 5140 U Go44J 0... 4 .8 45 a co...contamination may be attributable -- to the use of aqueous film forming foam ( AFFF ) in fire training at these areas. AFFF is a fluorocarbon surfactant with a...8217’ >.*.* chemical oxygen demand (COD) of 40,000 mg/l. Data are not ," available on the hazardous or toxic properties of AFFF and its - degradation
1985-07-01
protein, and AFFF (Air Force Firefighting Foam). The frequency of training exercises has varied considerably over the years. During the early 1970’s...Surface ’ Cement/ Bentonite Grout Bentonite Seal Sand Pack 1. Ground Water Elevation r Mamaur July 4.5, 194 * . FIGURE 3-9 WELL CONSTRUCTION SUMMARY, ZONE...e zzzzzzzzz z I z z Z 0 -. N N E-3 3 0 3 3 w 3 w 0 o z ~ zzzzzzzz z z z z E- 0 0 E- 0z zzzzzzzz zz aua E- 0 4 10 zw 3 E- z 0 0 U)z V fC InZ OE- 3
Installation Restoration Program Records Search for Holloman Air Force Base, New Mexico
1983-08-01
U r- ’ u O(N * Q 01 0 0 En 0 OR V r.0N m 0 0 r-C.) Hq 8 40( *0 0 --4 000 qT W m o (nn P4 0U 4) . j 4.4 .00 m * 04 0 00 0 4.) 0 0H *1~ ~ ~4 J4J4...Just southwest of these lagoons, a natural playa occurs which receives discharge from the base as well as seepage from the sewage lagoons. The...inundated portion of the playa is referred to as Lake Holloman. A dam/dike has been constructed across the south one quarter of the playa creating Lake
1984-11-01
CONTENTS Section Title Page 4.3 Water Chemistry Conditions 4-10 4.3.1 Groundwater Quality Results 4-10 0 4.4 Water Quality - General 4-11 4.4.1 Water...Quality - General 4-11 4.4.2 Water Quality at LAFB 4-11 4.4.3 Soil Quality - General 4-15 0 4.4.4 Soil Quality at LAFB 4-15 4.4.5 Conclusions 4-16 5...ALTERNATIVE MEASURES 5-1 5.1 General 5-1 0 5.1.1 Base Production Wells 5-2 5.1.2 Current and North Fire Depart- 5-2 ment Training Areas 5.2 Summary 5
1988-06-01
4 1r0 S tI I ;C;C 00000000 88 8888 mH I lu-It u~W I C In 1 0 Al0 * I " 1 a lei 0 !’. *’ 0 t I I UpV N MM w k4Ř I in N inM n in in in in in r4 4...John Forrest Luke AFB Richard Johnson WESTON Greg Hill WESTON Synopsis: The first portion of the meeting was a general discussion of well specifications...ore 1963-1964 Lancaster County General Hospital processing operations, 6 6Research laboratory for analytical Mr. Marks air contaminant testing
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-17
... Damage Assessment, Remediation, and Restoration Program for Fiscal Year 2011 AGENCY: National Oceanic and..., Remediation, and Restoration Program for Fiscal Year 2011. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration Program (DARRP) is announcing new...
Ray W. Brown; Michael C. Amacher; Walter F. Mueggler; Janice Kotuby-Amacher
2003-01-01
Methods for restoring native plant communities on acidic mine spoils at high elevations were evaluated in a "demonstration area" in the New World Mining District of southern Montana. Research plots installed in 1976 were assessed for 22 years and compared with adjacent native reference plant communities. A 1.5-acre (0.61-ha) area of mine spoils was shaped and...
Oak restoration trials: Santa Catalina Island
Lisa Stratton
2002-01-01
Two restoration trials involving four oak species have been implemented as part of a larger restoration program for Catalina Island. In 1997 the Catalina Island Conservancy began an active program of restoration after 50 years of ranching and farming activities on the island. The restoration program includes removing feral goats and pigs island-wide and converting 80...
Bearing Restoration by Grinding
1976-05-21
lIng of bearings prior to installation, installing a contaminated bearing, manufacturing defects, ring growth in service, and corrosion. Nonmetallic...operation of rolling-elemsnt bearings is growth of the bearing race rings. As an example, the inner or outer races, can grow due to metallurgical...transformations or due to hoop stresses during operation This growth results in the bearing being not reusable after removal from its application. For aircraft
Application-Program-Installer Builder
NASA Technical Reports Server (NTRS)
Wolgast, Paul; Demore, Martha; Lowik, Paul
2007-01-01
A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.
32 CFR 202.13 - Technical assistance for public participation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRC may request technical assistance for interpreting scientific and engineering issues with regard to the nature of environmental hazards at the installation and environmental restoration activities...
Winner, M.D.
1993-01-01
For more than 80 years, the Federal-State Cooperative Program in North Carolina has been an effective partnership that provides timely water information for all levels of government. The cooperative program has raised awareness of State and local water problems and issues and has enhanced transfer and exchange of scientific information. The U.S. Geological Survey (USGS) conducts statewide water-resources investigations in North Carolina that include hydrologic data collection, applied research studies, and other interpretive studies. These programs are funded through cooperative agreements with the North Carolina Departments of Environment, Health, and Natural Resources; Human Resources; and Transportation, as well as more than a dozen city and county governmental agencies. The USGS also conducts special studies and data-collection programs for Federal agencies, including the Department of Defense, the U.S. Soil Conservation Service, the Tennessee Valley Authority, and the U.S. Environmental Protection Agency that contribute to North Carolina's water information data base. Highlights of selected programs are presented to show the scope of USGS activities in North Carolina and their usefulness in addressing water-resource problems. The reviewed programs include the statewide data-collection program, estuarine studies, the National Water-Quality Assessment program, military installation restoration program, and groundwater flow model-development program in the Coastal Plain and Piedmont provinces.
Application of Long Distance Conveyance (LDC) of Dredged Sediments to Louisiana Coastal Restoration
2011-01-01
U.S. Army Engineer District, New Orleans, Laura Beldon, Louisiana Office of Coastal Protection and Restoration, Cheryl Brodnax, National...Louisiana Department of Natural Resources, Christopher Knotts , Louisiana Department of Natural Resources, Fay Lachney, MVN, Luke LeBas, Louisiana...associated with the petrochemical industry (e.g., Van Dyke et al. 1994) or backfilled canals dredged as part of the pipeline installation (e.g., Knott et al
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010 AGENCY: National... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.120 What...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.120 What...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
Responses to riparian restoration in the Spring Creek watershed, Central Pennsylvania
Carline, R.F.; Walsh, M.C.
2007-01-01
Riparian treatments, consisting of 3- to 4-m buffer strips, stream bank stabilization, and rock-lined stream crossings, were installed in two streams with livestock grazing to reduce sediment loading and stream bank erosion. Cedar Run and Slab Cabin Run, the treatment streams, and Spring Creek, an adjacent reference stream without riparian grazing, were monitored prior to (1991-1992) and 3-5 years after (2001-2003) riparian buffer installation to assess channel morphology, stream substrate composition, suspended sediments, and macroinvertebrate communities. Few changes were found in channel widths and depths, but channel-structuring flow events were rare in the drought period after restoration. Stream bank vegetation increased from 50% or less to 100% in nearly all formerly grazed riparian buffers. The proportion of fine sediments in stream substrates decreased in Cedar Run but not in Slab Cabin Run. After riparian treatments, suspended sediments during base flow and storm flow decreased 47-87% in both streams. Macroinvertebrate diversity did not improve after restoration in either treated stream. Relative to Spring Creek, macroinvertebrate densities increased in both treated streams by the end of the posttreatment sampling period. Despite drought conditions that may have altered physical and biological effects of riparian treatments, goals of the riparian restoration to minimize erosion and sedimentation were met. A relatively narrow grass buffer along 2.4 km of each stream was effective in improving water quality, stream substrates, and some biological metrics. ?? 2007 Society for Ecological Restoration International.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... DEPARTMENT OF COMMERCE Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration.... ACTION: Notice of Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for... Assessment, Remediation, and Restoration Program (DARRP) is announcing new indirect cost rates on the...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.121 May...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.121 May...
A cost analysis of a smoke alarm installation and fire safety education program.
Parmer, John E; Corso, Phaedra S; Ballesteros, Michael F
2006-01-01
While smoke alarm installation programs can help prevent residential fire injuries, the costs of running these programs are not well understood. We conducted a retrospective cost analysis of a smoke alarm installation program in 12 funded communities across four states. Costs included financial and economic resources needed for training, canvassing, installing, and following-up, within four cost categories: (a) personnel, (b) transportation, (c) facility, and (d) supplies. Local cost per completed home visit averaged 214.54 dollars, with an average local cost per alarm installed of 115.02 dollars. Combined state and local cost per alarm installed across all four states averaged 132.15 dollars. For every 1% increase in alarm installation, costs per alarm decrease by 1.32 dollars. As more smoke alarms are installed, the average installation cost per alarm decreases. By demonstrating effective economies of scale, this study suggests that smoke alarm programs can be implemented efficiently and receive positive economic returns on investment.
Immediate provisional restoration of a single-tooth implant in the esthetic zone: a case report.
Fu, Po-Sung; Wu, Yi-Min; Tsai, Ching-Fang; Huang, Ta-Ko; Chen, Wen-Cheng; Hung, Chun-Cheng
2011-02-01
Immediate implant restoration of single implants may demonstrate a positive effect on peri-implant soft tissue. Placement of a provisional restoration following implant surgery can create soft tissue contours that resemble normal gingival topography before placement of the definitive prosthesis. This article describes a staged approach of the mandibular permanent right central incisor, which was congenital missing. The proper space for restoration of the missing incisor was created through orthodontic treatment. The scheduled implant site was reconstructed using autogenous bone harvested from the chin region. After a healing period of four months, an implant was installed with the connection of a fixed provisional crown to a prefabricated temporary abutment. The soft tissue around the implant healed according to the contours of the provisional restoration and the emergence profile was used to duplicate the definitive restoration. Peri-implant esthetics was achieved through the staged approach and immediate restoration of the implant. Copyright © 2011. Published by Elsevier B.V.
1988-05-26
tD o 11 11 11 -l m N1 -0 e a, 1 0...2E z z z z 2 z z z S SO, EB S IED O-. CDI z C z z z CP TD gD 2 i 2Qaniz z z z sa -@ 2N’. Us(~ -- (XJ 3 gN( C’Ea - 2E S00 0 00 00 00 00 00 00 00 0 a 4...dr.f mm, 10 fd, I---_1_~a -- ______________0 5;’~ SOAP- bAL -ft VU.-a& 44L PUMPING LXVEL 4bd .’ lM" -- ) fI ... ______ @-Ph. " o0 3s....4..0 a ir a.m
1993-11-01
RECOMMENDATIONS SECTION 7 REFERENCES APPENDIX A MONITORING WELL CONSTRUCTION RECORDS AND BORING LOGS APPENDIX B SOIL BORING LOGS 3 APPENDIX C ...0.25 .o000 2- C *LUOEITNYL VINYL ETNEE NA i2/o/U NP 0. 131.0ICNLORMTNMIE NA 12/OS/IS 0.35 0.0S 1.000 DIOCULUSUGRTNAN NA 12/OS/US a 0.45 1.000 ¶ ,2...12l/Sm a 10.001011 kS kfue(K)I m ot~b 12/09/ 12/fl/U a 10.00 1.005 ugejpvu 12/09/ tZ/3U 0 10.0 1 .M E, I c . ce 4Z- CR0ESFENGINEERING SCIENCE 135-073
1984-06-01
APPENDIX E GLOSSARY OF TERMINOLOGY AND ABBREVIATIONS AF: Air Force. AFESC: Air Force Engineering and Services Center. 3E AFFF : Aqueous Film Forming Foam...34U - 0 ID 0 w M ol fc a, C’ 4) Em)4 Q 4)j 0 0 0 x "a x a. 13 As W a- cu I e W 4)-~ ? 4 -04.4 4.1. jl) in -U)4 0 14)~ ~~ ~~ ~ 0 0 00.4 4 ~ 4 )4 I...8 and 3 a; fC ;arit ,:On or Ccrce E rer ierat or: US.WI~ereral Electric - ’~’Yo lwi Unkrrown :.:e ;aeid by: E.ob Steele, 1,;hn Absalon, Ernie
1986-04-07
Commissary/ FCS Operating Loc L Hq MAC U.S. Customs U.S. Department of Agriculture U.S. Postal Service USAF Trial Judiciary 5th Circuit 17th...extinguish- ing agents used at the site were aqueous film forming foam ( AFFF ), protein foam, and water. The site has no berms or diKes to contain...in ^r^u-i —-••^■■r*M(^*iMr<-* ■•»«M<N»--*’ fc «^’^a • M oo ooo ostfr^o^oo — — or* — — i-*’«’*-«’^r^o — M -N*^ or»^ -iM^0’^w^’-><n^>#^’fN
1986-06-10
82174 m c r- %0~ tn r- cL LC 0 $44 bO CO 4 4- 4 -r- :x:c :41 La COOP w w-. u- r0.0)CO 0)~~~ 0) 0 0 O4- -4Ca co~i CO 0)00 0 >O- .H CO) 0O CO CO 0 o-4 Li...bChromatographs of samples MW 103 and field duplicate QA6b showed a peak matching the re- I tention time of vinyl chloride. The positive identity of...this peak was not confirmed by either second-column gas chromatographic analysis or by mass spectroscopy. Therefore, it cannot be definitely stated
1986-08-09
aquifer analysis, and sampling of ground water monitor wells to determine effectiveness of wastewater treatment process. Ida- Con Corporation...The Pro ect )A Spervisor i dc :7ri J, I, ontrollin hvde co n ... nsr 44 a Fie Ld note books, Iogsheets , be nch sheets, t rac in.r r-l, and report...NON .ocp 4a 0 .0... .. - a o 00--.--- ( N NN N .4N .)mm o m mM 3 2 4.2 3 3 3 3 33 3 3 3 m w r3 GmO 23 U, 3 33 3 2 3 3 3 30O13 CŘ oa nL nV) 0U n ( A 0L
1993-09-01
840IR21400 II noMoaU "IfafO "WdwotvW&Q qWG1Mo O4ýSW w"W V~lvw)p-0 Wft%&,W111’W"AOMMC A W-o w s -ucm 1 . Agenc Use Q*~ ILena SLaMI 2. Ropers 08O 3. Repsis...Air Nationai Guara Readiness Center Andrews Air Force Base. Marviand :0331 11. SuppiementM Note, 1 . 0is~ntrbgnAwrAisababi~y Statemwa 12b. Diitribdise...IINMO O pp Wicno A1,- 1bin 1 Uf4 6.~ k~/s Primc ooe 1V. Secuiicy ClassdmcEion of ¶3.T SMaau Ctassmicaton of 19. SecsuriyOsfs of 20 ISMeAbto
1995-04-01
kg 1/26/94 8260I Methylenec chloride ɘ.012 0.012 m~y/kiy 1/26/94 8260 Meihyliuethacrylate ɘ.012 0.012 mg/kg 1/26/94 8260 4- Methyl -2-peritanone (MIBK...0.012 0.012 mgo/kg 1/23/94 8260 Methylmicthiacrylate < 0.012 0.012 mgL,/kg2 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0. 029 0.029 mg/kg 1/23/94 8260...8260EMethylene chloride ɘ.01 1 0.011 mgý/k~g 1/23/94 8260 Methyltnethiacrylate ɘ.011 0.011 mng/kg 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0.028
NASA Astrophysics Data System (ADS)
Snitgen, J. L.; Moren, M. M.
2005-05-01
During rainfall and snow melt events, a first order, cold-water stream was receiving varying amounts of liquefied manure from a concentrated feed lot. Stream restoration efforts included the implementation of best management practices to prevent further discharge of the water/manure mixture to the stream. Physical, chemical and biological data were collected pre-construction and two years post-construction of the containment system at a fixed location downstream of the feedlot. Hilsenhoff Biotic Index scores improved significantly, from 6.79 or "Fairly Poor" before the installation of the manure containment system, to 5.28 or "Good" after the installation of the manure containment system. Taxa richness improved from 25 to 34 and the EPT score improved from 0 to 4. Key words: macroinvertebrate, community response, manure, feedlot runoff, stream restoration
[COMPLICATIONS OF STENTINGOF UPPER URINARY TRACT].
Shkodkin, S V; Kogan, M I; Lyubushkin, A V; Miroshnichenko, O V
2015-01-01
Restoring the passage of urine through the upper urinary tract routinely is achieved by installing of external or internal drainage. Due to its objective advantages, internal drainage has been successfully used in surgery of the upper urinary tract. This review outlines the problems associated with the use ofinternal stents, namely difficultyin installation, migration, and reflux and stent obstruction, bacterial colonization of the stent, the development of functional and morphological changes in the drained segment of urinary tract.
45 CFR 2532.10 - Military Installation Conversion Demonstration programs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to..., used with respect to an affected military installation, includes— (i) Conversion of the installation or...
45 CFR 2532.10 - Military Installation Conversion Demonstration programs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to..., used with respect to an affected military installation, includes— (i) Conversion of the installation or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, J.L.; Hawkins, W.L.; Mathews, M.
This report describes research done at Los Alamos in FY 1993 for the Hydrologic Resources Management Program. The US Department of Energy funds this research through two programs at the Nevada Test Site (NTS): defense and groundwater characterization. Los Alamos personnel have continued to study the high-pressure zone created in the aquifer under Yucca Flat. We analyzed data from a hole in this area (U-7cd) and drilled another hole and installed a water monitoring tube at U-4t. We analyzed water from a number of locations on the NTS where we know there are radionuclides in the groundwater and critiqued themore » effectiveness of this monitoring effort. Our program for analyzing postshot debris continued with material from the last nuclear test in September 1992. We supported both the defense program and the groundwater characterization program by analyzing water samples from their wells and by reviewing documents pertaining to future drilling. We helped develop the analytical methodology to be applied to water samples obtained in the environmental restoration and waste management efforts at the NTS. Los Alamos involvement in the Hydrologic Resources Management Program is reflected in the appended list of documents reviewed, presentations given, papers published, and meetings attended.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Dyke, G.D.; Shem, L.M.; Zimmerman, R.E.
1994-12-01
The goal of the Gas Research Institute Wetland Corridors Program is to document impacts of existing pipelines on the wetlands they traverse. To accomplish this goal, 12 existing wetland crossings were surveyed. These sites varied in elapsed time since pipeline construction, wetland type, pipeline installation techniques, and night- of-way management practices. This report presents the results of a survey conducted on August 22, 1991, in an emergent intertidal estuarine wetland in Terrebonne Parish, Louisiana. The site includes three pipelines installed between 1958 and 1969. Vegetation within the site comprises three native tidal marsh grasses: Spartina alterniflora, Spartina patens, and Distichlismore » spicata. All three species occurred over the pipelines, within the right-of-way and in both natural areas. Vegetative differences attributable to the installation or presence of the pipelines were not obvious over the pipelines or in the habitat east of the pipelines. However, because of the presence of a canal west of the 1969 pipeline, vegetation was less abundant in that area, and D. spicata was absent from all but the most distant plots of the transacts. Data obtained in the study indicate that when rights-of-way through brackish marsh are restored to their original elevations, they are revegetated with native vegetation similar to that in surrounding areas.« less
EPA is evaluating ecosystem restoration and management techniques to ensure they create sustainable solutions for degraded watersheds. ORD NRMRL initiated the Restoration Plus (RePlus) program in 2002 to a) evaluate ecosystem restoration and management options, b) assess the non-...
2015 Review on the Extension of the AMedP-8(C) Methodology to New Agents, Materials, and Conditions
2016-06-01
Outside the United States (Washington, DC: DOD, November 2013). 6 4715.07 and 4715.08, deal with environmental remediation and restoration. DODI...May 2013), 2. 9 DODI 4715.08, Remediation of Environmental Contamination Outside the United States (Washington, DC: DOD, November 2013). 10 DODD... remediate damage, both in the United States and on overseas installations. Those policies largely extend U.S. legal requirements to DOD installations
Ma, Tracey; Byrne, Patrick A; Bhatti, Junaid A; Elzohairy, Yoassry
2016-10-01
Drinking and driving is a major risk factor for traffic injuries. Although ignition interlocks reduce drinking and driving while installed, several issues undermine their implementation including delayed eligibility for installation, low installation once eligible, and a return to previous risk levels after de-installation. The Canadian province of Ontario introduced a "Reduced Suspension with Ignition Interlock Conduct Review" Program, significantly changing pre-existing interlock policy. The Program incentivizes interlock installation and an "early" guilty plea. It also attempts to reduce long-term recidivism through behavioural feedback and compliance-based removal. This evaluation is the first in assessing Program impact. Ontario drivers with a first time alcohol-impaired driving conviction between July 1, 2005 and November 25, 2014 comprised the study cohort. Longitudinal analyses, using interrupted time series and Cox regression, were conducted in which exposure was the Program and the outcomes were ignition interlock installation (N=30,200), pre-trial elapsed time (N=30,200), and post-interlock recidivism (N=9326). After Program implementation, installation rates increased by 54% and pre-trial elapsed time decreased by 146 days. Results suggest no effect on post-interlock recidivism. Through an incentive-based design, this Program was effective at addressing two commonly cited barriers to interlock implementation- delayed eligibility for installation and low installation once eligible. Results reveal that installation rates are responsive not only to incentivization but also to other external factors, thus presenting an opportunity for policy makers to find unique ways to influence interlock uptake, and thereby, to extend their deterrent effects to a larger subset of the population. This study is one of the few that do not rely on proxy measures of installation rate. Copyright © 2016 Crown. Published by Elsevier Ltd.. All rights reserved.
50 CFR 80.11 - Submission of proposals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.11 Submission of...) authorized to sign the Wildlife and Sport Fish Restoration Program documents, and any changes in such...
48 CFR 228.102-70 - Defense Environmental Restoration Program construction contracts.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Restoration Program construction contracts. 228.102-70 Section 228.102-70 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Bonds 228.102-70 Defense Environmental Restoration Program construction contracts...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ebberts, Blaine D.; Zelinsky, Ben D.; Karnezis, Jason P.
We successfully implemented and institutionalized an adaptive management (AM) process for the Columbia Estuary Ecosystem Restoration Program, which is a large-scale restoration program focused on improving ecosystem conditions in the 234-km lower Columbia River and estuary. For our purpose, “institutionalized” means the AM process and restoration program are embedded in the work flow of the implementing agencies and affected parties. While plans outlining frameworks, processes, or approaches to AM of ecosystem restoration programs are commonplace, establishment for the long term is not. This paper presents the basic AM framework and explains how AM was implemented and institutionalized. Starting with amore » common goal, we pursued included a well-understood governance and decision-making structure, routine coordination and communication activities, data and information sharing, commitment from partners and upper agency management to the AM process, and meaningful cooperation among program managers and partners. The overall approach and steps to implement and institutionalize AM for ecosystem restoration explained here are applicable to situations where it has been less than successful or, as in our case, the restoration program is just getting started.« less
Space Shuttle Mission STS-61: Hubble Space Telescope servicing mission-01
NASA Technical Reports Server (NTRS)
1993-01-01
This press kit for the December 1993 flight of Endeavour on Space Shuttle Mission STS-61 includes a general release, cargo bay payloads and activities, in-cabin payloads, and STS-61 crew biographies. This flight will see the first in a series of planned visits to the orbiting Hubble Space Telescope (HST). The first HST servicing mission has three primary objectives: restoring the planned scientific capabilities, restoring reliability of HST systems and validating the HST on-orbit servicing concept. These objectives will be accomplished in a variety of tasks performed by the astronauts in Endeavour's cargo bay. The primary servicing task list is topped by the replacement of the spacecraft's solar arrays. The spherical aberration of the primary mirror will be compensated by the installation of the Wide Field/Planetary Camera-II and the Corrective Optics Space Telescope Axial Replacement. New gyroscopes will also be installed along with fuse plugs and electronic units.
50 CFR 80.9 - Notice of desire to participate.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS § 80.9 Notice of desire to... Federal Assistance which contains plans for the use of Wildlife and Sport Fish Restoration Program funds...
50 CFR 80.124 - How may an agency use unexpended program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION...
50 CFR 80.124 - How may an agency use unexpended program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION...
76 FR 14372 - New Mexico Collaborative Forest Restoration Program Technical Advisory Panel
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... DEPARTMENT OF AGRICULTURE Forest Service New Mexico Collaborative Forest Restoration Program Technical Advisory Panel AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The New Mexico Collaborative Forest Restoration Program Technical Advisory Panel will meet in Albuquerque, New Mexico. The...
7 CFR 701.10 - Qualifying minimum cost of restoration.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 7 2010-01-01 2010-01-01 false Qualifying minimum cost of restoration. 701.10 Section..., DEPARTMENT OF AGRICULTURE AGRICULTURAL CONSERVATION PROGRAM EMERGENCY CONSERVATION PROGRAM AND CERTAIN RELATED PROGRAMS PREVIOUSLY ADMINISTERED UNDER THIS PART § 701.10 Qualifying minimum cost of restoration...
50 CFR 80.124 - How may an agency use unexpended program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION...
50 CFR 80.124 - How may an agency use unexpended program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION...
NASA Astrophysics Data System (ADS)
Tanaka, Toshihiko; Sakai, Yosiharu; Konomi, Yosiyuki; Chayama, Kazuhiro; Minamoto, Masahiko; Matsunaga, Katsuya
1999-11-01
Restoration activities after disasters such as landslides or rock avalanches require rapid action, but in fact, in most cases these activities are very inefficient because of the danger of secondary disasters. A system which can operate reconstruction machinery by remote control was therefore developed, and it was installed on general-purpose construction machines (backhoe shovels). Control performance experiments and field experiments on this developed system were carried out, and its effectiveness was confirmed.
50 CFR 80.30 - Why must an agency certify the number of paid license holders?
Code of Federal Regulations, 2013 CFR
2013-10-01
... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH... apportion funds in the Wildlife Restoration and Sport Fish Restoration programs among the States. ...
50 CFR 80.30 - Why must an agency certify the number of paid license holders?
Code of Federal Regulations, 2014 CFR
2014-10-01
... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH... apportion funds in the Wildlife Restoration and Sport Fish Restoration programs among the States. ...
50 CFR 86.94 - What crediting language should I use?
Code of Federal Regulations, 2012 CFR
2012-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.94 What crediting...: (a) Example 1: The Federal Aid in Sport Fish Restoration Program funded this facility thanks to your...
50 CFR 86.94 - What crediting language should I use?
Code of Federal Regulations, 2010 CFR
2010-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.94 What crediting...: (a) Example 1: The Federal Aid in Sport Fish Restoration Program funded this facility thanks to your...
50 CFR 86.94 - What crediting language should I use?
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.94 What crediting...: (a) Example 1: The Federal Aid in Sport Fish Restoration Program funded this facility thanks to your...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-20
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010 AGENCY: National... Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration Program (DARRP) is...
Hecker, R M
2017-02-01
When drinking water contaminations occur in installations belonging to a semiautonomous condominium community ( Wohnungseigentumsgemeinschaft ) and the water installation's final paths being owned by the various condominium owners, the German legal definition of the party responsible has a broad reach. Therefore, authorities should address the condominium community, the condominium owners and the community administrator ( WEG-Verwalter ). © Georg Thieme Verlag KG Stuttgart · New York.
1991-01-01
LOCATIONS DRAWN BY J. WELL LOCATIONS DATE: 5-31. DATE -31-MGM= . ENCE CORNER (O’S. & O’W) ...........x xC.O.E. MONUIM:NT NO. 324 NORTH COOR. - 670.555.7 x...RUDWTREEVTO OTU M ~ HYRAULC GRDENTLIN A% A W0 78W.M. 3 B1 - ENCE CORNER tos & o’U) -x x -x .O. E. MIONUMENT NO. 324 x-x-NORTH COOR. -. 670;;55;.7 x...ROUNwATE ELEATIO CON4UR3 ~~~~W xRJJ t ZRQ N IN tW 9 . AILA~E 261~ W-03- 26.6W~~ 0 B’ ENCE CORNER (O’S. & O’W) -K XMx X - .O.E. MONUMENT NO. 324
1991-03-29
S) A-927 BAFB-0427 22159-4 13-C-2SB (S) A-929 BAFB- 0428 22159-5 13-C-2SB (S) A-930 BAFB-0256 21872-11 13-C-2SB (S) A-931 BAFB-0429 22159-6 13-C-2SB (S...16 18-C-19SS (S) A-1305 BAFB-0021 21621-17 18-C-20SS (S) A- 1307 BAFB-0022 21621-18 18-C-20SS (S) A-1309 BAFB-0024 21621-20 18-C-21SS (S) A-1311 BAFB...ASA#9) 21.0 N/A MERCURY (SW7471) (Resampled for this analysis. See BAFB-0427 and BAFB- 0428 ) TFH-DIESEL (TFH-DIESEL) ə.3 1.3 mg/kg. (non-detect) TFH
1987-04-01
it.fr CL SAtVOY CLAY ffm «aJlar *# «oo-y* CAttpt moist 1 afto-3o.1 ff <M J AQ21 ÄJJ 100 I 5 Of9 G-ftftVtL occr\\^ sr»J<<J, 5...r<. »* u«</ «<**#**/%* ***>4 ***" I>#K HaWat/e Jcvc-lvp*4<*t ä t/mflcfß»*cit a/*-*p 7 v-y-s *r l-S a 4-1*5 3b-?/-5 ck¥ ClAjf ffm ±il...Rick A. Belan Project Director RAB:sg Attachment H-120 ^«P^—iw^^,«--^-^*wg ATTACHMENT 1 H-121 mTS 6-: 1 I As -oi ^ acca - -03
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wujcik, W.J.; Lowe, W.L.; Marks, P.J.
1989-08-01
The United States Army operates explosives manufacturing plants to produce various forms of explosives used in military ordnance. Manufacturing activities at such plants result in the production of organic wastewaters that contain both explosive residues and other organic chemicals. Several treatment technologies have been developed to treat these wastewaters for final discharge. Past waste handling practices at explosives manufacturing plants commonly included the use of the unlined lagoons or pits for containing process wastewaters. As a result of these past practices, some explosives residues may leach through the soil and contaminated groundwater. Therefore, the treatment of contaminated groundwater may bemore » required.« less
1990-05-01
Pentachloronitrobenzene ND mg/kg 2.5 S P henaceti n NO mg/kg 2- Picoline ND mg/kgI Pronamideh NO mg/kg 2.5I benzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 I...mg/kg 2.5 Pentachloronitrobenzene NO mg/kg 2.5 Phenaceti n ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronamide ND mg/kg 2.5 1 ,2,4,5-Tetrachloro benzene ND...Phenacetin ND mg/kg 2.5 2- Picoline ND mg/kg 2.5 Pronami de ND mg/kg 2.5 1,2,4,5-Tetrachlorobenzene ND mg/kg 2.5 2, 6-Di chi orophenol ND mg/kg 2.5 2-Methyl
1994-04-01
1597 SDG LA3 ID KaMBER COmOVouD lZXP PORN SP 443 m/m 442 u/x CALC LAB CALC LIMIT RLAIz R3LATrVZ 0 AD= I AIDO ERROR -BU AWN 1 1545 DF930308A21 DFTPP...1597 SAWPLZ SAM) E 0 CONPOUUD SPIKU 8 ANPLZ NATRIX M HD 15 mm M I0 MI D CAL APC NUMIER TYPE ADDED RESULT SPIKE t 1EA t VRI RPD VWi 1566 1545 1,4-DICKL...1597 E1DO LAB ID XMNDI CONPOUND ZXP PORN EPZC1176 u/s 1174 u/u CALC LAB CALC ILIMIT RELATIVE RELATIVE I ABUN I £303 ERROR 1545 B7930307356 3PB y y
1991-10-01
ks C-12 GATE 660 DUDLEY I 0S813OAO63SBO 111 UUOAISSITE 30 30SAP1 5 A N-N0SRADP19 FNC Q0A1 AAT 3AiO BANG WEB Ll SHALLOW A 3AS 62 AR1L AOIN07AP SCSAPO...SCALE I FEET CHI~AN LINK/SAAMED WIRE FENCE SA29 Figtrio C-GG. Mep o0F SA 29 and Vicinity. C-228 iOrM pOrN AT 1 0 j B. Activity/Area: BUILDING 677...ground water extraction system near Building 666. Furthermore, is a deep boring warranted at each location t4here shallow contamination is found? 3. Site
50 CFR 80.25 - Multiyear financing under the Dingell-Johnson Sport Fish Restoration Program.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Johnson Sport Fish Restoration Program. 80.25 Section 80.25 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH... SPORT FISH RESTORATION ACTS § 80.25 Multiyear financing under the Dingell-Johnson Sport Fish Restoration...
50 CFR 86.94 - What crediting language should I use?
Code of Federal Regulations, 2013 CFR
2013-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.94 What crediting...: (a) Example 1: The Federal Aid in Sport Fish Restoration Program funded this facility thanks to your...
50 CFR 86.94 - What crediting language should I use?
Code of Federal Regulations, 2014 CFR
2014-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.94 What crediting...: (a) Example 1: The Federal Aid in Sport Fish Restoration Program funded this facility thanks to your...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kraybill, R.L.; Smart, G.R.; Bopp, F.
1985-09-04
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less
Rotational joint for prosthetic leg
NASA Technical Reports Server (NTRS)
Jones, W. C.; Owens, L. J.
1977-01-01
Device is installed in standard 30 millimeter tubing used for lower leg prosthetics. Unit allows proper rotation (about 3 degrees) of foot relative to the hip, during normal walking or running. Limited rotational movement with restoring force results in a more natural gait.
50 CFR 80.14 - Application of Wildlife and Sport Fish Restoration Program funds.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Application of Wildlife and Sport Fish Restoration Program funds. 80.14 Section 80.14 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM...
Koss, Mary P; Bachar, Karen J; Hopkins, C Quince; Carlson, Carolyn
2004-12-01
Problems in criminal justice system response to date-acquaintance rape and nonpenetration sexual offenses include (a) they are markers of a sexual offending career, yet are viewed as minor; (b) perpetrators are not held accountable in ways that reduce reoffense; and (c) criminal justice response disappoints and traumatizes victims. To address these problems, a collaboration of victim services, prosecutors, legal scholars, and public health professionals are implementing and evaluating RESTORE, a victim-driven, community-based restorative justice program for selected sex crimes. RESTORE prepares survivors, responsible persons (offenders), and both parties' families and friends for face-to-face dialogue to identify the harm and develop a redress plan. The program then monitors the offender's compliance for 12 months. The article summarizes empirical data on problems in criminal justice response, defines restorative justice models, and examines outcome. Then the RESTORE program processes and goals are described. The article highlights community collaboration in building and sustaining this program.
Influence of forces acting on side of machine on precision machining of large diameter holes
NASA Astrophysics Data System (ADS)
Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.
2018-03-01
One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.
An Investigation of the Aerodynamics and Cooling of a Horizontally-Opposed Engine Installation
NASA Technical Reports Server (NTRS)
Miley, S. J.
1977-01-01
A research program to investigate the aerodynamics of reciprocating aircraft engine cooling installations is discussed. Current results from a flight test program are presented concerning installation flow measurement methods. The influence of different inlet designs on installation cooling effectiveness and efficiency are described.
Designing stream restoration structures using 3D hydro-morphodynamic numerical modeling
NASA Astrophysics Data System (ADS)
Khosronejad, A.; Kozarek, J. L.; Hill, C.; Kang, S.; Plott, R.; Diplas, P.; Sotiropoulos, F.
2012-12-01
Efforts to stabilize and restore streams and rivers across the nation have grown dramatically in the last fifteen years, with over $1 billion spent every year since 1990. The development of effective and long-lasting strategies, however, is far from trivial and despite large investments it is estimated that at least 50% of stream restoration projects fail. This is because stream restoration is today more of an art than a science. The lack of physics-based engineering standards for stream restoration techniques is best underscored in the design and installation of shallow, in-stream, low-flow structures, which direct flow away from the banks, protect stream banks from erosion and scour, and increase habitat diversity. Present-day design guidelines for such in-stream structures are typically vague and rely heavily on empirical knowledge and intuition rather than physical understanding of the interactions of the structures the flow and sediment transport processes in the waterway. We have developed a novel computer-simulation based paradigm for designing in stream structures that is based on state-of-the-art 3D hydro-morphodynamic modeling validated with laboratory and field-scale experiments. The numerical model is based on the Curvilinear Immersed Boundary (CURVIB) approach of Kang et al. and Khosronejad et al. (Adv. in Water Res. 2010, 2011), which can simulate flow and sediment transport processes in arbitrarily complex waterways with embedded rock structures. URANS or large-eddy simulation (LES) models are used to simulate turbulence. Transport of bed materials is simulated using the non-equilibrium Exner equation for the bed surface elevation coupled with a transport equation for suspended load. Extensive laboratory and field-scale experiments have been carried out and employed to validate extensively the computational model. The numerical model is used to develop a virtual testing environment within which one or multiple in-stream structures can be embedded in representative live-bed meandering waterways and simulated numerically to systematically investigate the sensitivity of various design and installation parameters on structure performance and reliability. Waterway geometries are selected by a statistical classification of rivers and streams to represent typical sand-bed and gravel-bed systems found in nature. Results will be presented for rock vanes, J-hook vanes and bendway weirs. Our findings provide novel physical insights into the effects of various in-stream structures on turbulent flow and sediment transport processes in meandering rivers, underscore these effects for different stream-bed materials, and demonstrate how such physics-based analysis can yield design guidelines that often challenge what is commonly done in practice today. To our knowledge, our work is the first systematic attempt to employ advanced numerical modeling coupled with massively parallel supercomputers to design hydraulic structures for stream restoration. This work was supported by NSF Grants EAR-0120914 and EAR-0738726, National Cooperative Highway Research Program Grant NCHRP-HR 24-33.
Wulff, Marissa L.; Brown, Larry R.
2015-01-01
After more than 50 years of extensive water diversion for urban and agriculture use, a major settlement was reached among the U.S. Departments of the Interior and Commerce, the Natural Resources Defense Council, and the Friant Water Users Authority in an effort to restore the San Joaquin River. The settlement received Federal court approval in October 2006 and established the San Joaquin River Restoration Program, a multi-agency collaboration between State and Federal agencies to restore and maintain fish populations, including Chinook salmon, in the main stem of the river between Friant Dam and the confluence with the Merced River. This is to be done while avoiding or minimizing adverse water supply effects to all of the Friant Division contractors that could result from restoration flows required by the settlement. The settlement stipulates that water- and sediment-quality data be collected to help assess the restoration goals. This report summarizes and evaluates water-quality data collected in the main stem of the San Joaquin River between Friant Dam and the Merced River by the U.S. Bureau of Reclamation for the San Joaquin River Restoration Program during 2009-11. This summary and assessment consider sampling frequency for adequate characterization of variability, sampling locations for sufficient characterization of the San Joaquin River Restoration Program restoration reach, sampling methods for appropriate media (water and sediment), and constituent reporting limits. After reviewing the water- and sediment-quality results for the San Joaquin River Restoration Program, several suggestions were made to the Fisheries Management Work Group, a division of the San Joaquin River Restoration Program that focuses solely on the reintroduction strategies and health of salmon and other native fishes in the river. Water-quality results for lead and total organic carbon exceeded the Surface Water Ambient Monitoring Program Basin Plan Objectives for the San Joaquin Basin, and results for copper exceeded the U.S. Environmental Protection Agency Office of Pesticide Programs' aquatic-life chronic and acute benchmarks for invertebrates. One sediment sample contained detections of pyrethroid pesticides bifenthrin, lambda-cyhalothrin, and total permethrin at concentrations above published chronic toxicity thresholds.
Parnell, J.M.
1997-01-01
The U.S. Geological Survey (USGS), in cooperation with Aeronautical Systems Center, Environmental Management Directorate, Restoration Division, prepared the Surface- and Ground- Water Monitoring Work Plan for Air Force Plant 85 (AFP 85 or Plant), Columbus, Ohio, under the Air Force Installation Restoration Program to characterize any ground-water, surface-water, and soil contamination that may exist at AFP 85. The USGS began the study in November 1996. The Plant was divided into nine sampling areas, which included some previously investi gated study sites. The investigation activities included the collection and presentation of data taken during drilling and water-quality sampling. Data collection focused on the saturated and unsatur ated zones and surface water. Twenty-three soil borings were completed. Ten monitoring wells (six existing wells and four newly constructed monitoring wells) were selected for water-quality sam pling. Surface-water and streambed-sediment sampling locations were chosen to monitor flow onto and off of the Plant. Seven sites were sampled for both surface-water and streambed-sediment quality. This report presents data on the selected inorganic and organic constituents in soil, ground water, surface water, and streambed sediments at AFP 85. The methods of data collection and anal ysis also are included. Knowledge of the geologic and hydrologic setting could aid Aeronautical Systems Center, Environmental Management Directorate, Restoration Division, and its governing regulatory agencies in future remediation studies.
FeynArts model file for MSSM transition counterterms from DREG to DRED
NASA Astrophysics Data System (ADS)
Stöckinger, Dominik; Varšo, Philipp
2012-02-01
The FeynArts model file MSSMdreg2dred implements MSSM transition counterterms which can convert one-loop Green functions from dimensional regularization to dimensional reduction. They correspond to a slight extension of the well-known Martin/Vaughn counterterms, specialized to the MSSM, and can serve also as supersymmetry-restoring counterterms. The paper provides full analytic results for the counterterms and gives one- and two-loop usage examples. The model file can simplify combining MS¯-parton distribution functions with supersymmetric renormalization or avoiding the renormalization of ɛ-scalars in dimensional reduction. Program summaryProgram title:MSSMdreg2dred.mod Catalogue identifier: AEKR_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEKR_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: LGPL-License [1] No. of lines in distributed program, including test data, etc.: 7600 No. of bytes in distributed program, including test data, etc.: 197 629 Distribution format: tar.gz Programming language: Mathematica, FeynArts Computer: Any, capable of running Mathematica and FeynArts Operating system: Any, with running Mathematica, FeynArts installation Classification: 4.4, 5, 11.1 Subprograms used: Cat Id Title Reference ADOW_v1_0 FeynArts CPC 140 (2001) 418 Nature of problem: The computation of one-loop Feynman diagrams in the minimal supersymmetric standard model (MSSM) requires regularization. Two schemes, dimensional regularization and dimensional reduction are both common but have different pros and cons. In order to combine the advantages of both schemes one would like to easily convert existing results from one scheme into the other. Solution method: Finite counterterms are constructed which correspond precisely to the one-loop scheme differences for the MSSM. They are provided as a FeynArts [2] model file. Using this model file together with FeynArts, the (ultra-violet) regularization of any MSSM one-loop Green function is switched automatically from dimensional regularization to dimensional reduction. In particular the counterterms serve as supersymmetry-restoring counterterms for dimensional regularization. Restrictions: The counterterms are restricted to the one-loop level and the MSSM. Running time: A few seconds to generate typical Feynman graphs with FeynArts.
North American Board of Certified Energy Practitioners Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawrence, Richard
The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less
Bearing restoration by grinding
NASA Technical Reports Server (NTRS)
Hanau, H.; Parker, R. J.; Zaretsky, E. V.; Chen, S. M.; Bull, H. L.
1976-01-01
A joint program was undertaken by the NASA Lewis Research Center and the Army Aviation Systems Command to restore by grinding those rolling-element bearings which are currently being discarded at aircraft engine and transmission overhaul. Three bearing types were selected from the UH-1 helicopter engine (T-53) and transmission for the pilot program. No bearing failures occurred related to the restoration by grinding process. The risk and cost of a bearing restoration by grinding programs was analyzed. A microeconomic impact analysis was performed.
The U.S. Environmental Protection Agency (U.S. EPA) is evaluating ecosystem restoration and management techniques to ensure they create sustainable solutions for degraded watersheds. The ORD/NRMRL initiated the Restoration Plus (RePlus) program in 2002, which emphasizes collabora...
Assessment of Composting Feasibility at Army Installations
2008-09-01
The end product is a contaminant-free humus that can enhance landscaping and horticultural applications. Composting costs considerably less than...grasses, flowers, and trees by becoming the humus . Original wetland plants can be restored with the use of compost during planting. Compost provides
ERIC Educational Resources Information Center
Bailie, John W., III
2012-01-01
This study examined power and authority in the student-instructor relationship in a restorative practices-based graduate program. This qualitative investigation utilized a narrative approach. Ten alumni of the International Institute for Restorative Practices master's degree programs were engaged in a one-time face-to-face interview and document…
ERIC Educational Resources Information Center
Rodriguez, Nancy
2007-01-01
Programs with restorative justice ideals attempt to incorporate victims and community members into the administration of justice. Although these programs have become increasingly popular, only a few programs in the United States have been the focus of prior studies. Using official juvenile court data from an urban, metropolitan area, this study…
GSD Update: Restoration on the range: Healing America's iconic landscapes
Christie Aschwanden
2011-01-01
Restoration is one of five focal areas of the Grassland, Shrubland and Desert Ecosystems Science Program (GSD). Our program mission is to develop and deliver knowledge and tools that will help to sustain and restore grasslands, shrublands and deserts threatened by invasive species, disturbances, urban pressures and climate change. Scientists in our program develop...
NASA Astrophysics Data System (ADS)
Qassim, Suzane; Dixon, Simon; Rowson, James; Worrall, Fred; Evans, Martin
2013-04-01
Polluted by past atmospheric deposition, eroded and burnt, the Bleaklow plateau (Peak district National Park, UK) has long been degraded. Peatlands are important carbon reservoirs and can act as sources or sinks of carbon. Dissolved organic carbon (DOC) is carbon lost from peatlands via the fluvial pathway and as the major component of water colour it is costly to remove during water treatment processes. The Bleaklow Summit peatlands, were subjected to a large wildfire in 2003 devegetating 5.5km2. This fire prompted stakeholders to initiate a large-scale programme of restoration of the plateau. This study considered restoration techniques across four sites: all four sites were seeded with lawn grass, limed and fertilised; to raise the pH and allow establishment of vegetation. In addition to these interventions, one site also had a mulch of Calluna vulgaris applied to the surface to allow soil stabilisation and promote vegetation establishment and another site had biodegradable geojute textile mesh installed, to stabilize the steep gully surfaces. Another site had a gully block installed, to reduce peat desiccation and erosion. This study will compare the four restored sites to two types of comparators: bare soil sites where no restoration was undertaken and a naturally vegetated site unaffected by the 2003 wildfire. Each site had six replicate dipwells, installed in two groups of three. The depth to the water table was monitored and soil water samples collected for analysis, monthly for 5 years, from Nov 2006 - Jan 2012. No significant difference in DOC concentration was found between control and treated sites. There was, however, a significant difference in DOC composition between sites and over the 5 year period of monitoring. UV-vis absorbance of the samples is used to quantify the fulvic to humic components of DOC. The vegetated control was not significantly different to the bare sites; however the vegetated control had a significantly greater humic fraction of than the seeded, limed and fertilised only site, as well as the seeded, limed, C. vulgaris mulched site. This is possibly related to vegetation and litter layer establishment. A suite of water quality data (conductivity, pH and cation data) are now being analysed in combination with DOC to increase understanding of the relationship between bare site re-vegetation and DOC compositional change.
Hoke, Charles H; Snyder, Clifford E
2013-03-15
Respiratory pathogens cause morbidity and mortality in US military basic trainees. Following the influenza pandemic of 1918, and stimulated by WWII, the need to protect military personnel against epidemic respiratory disease was evident. Over several decades, the US military elucidated etiologies of acute respiratory diseases and invented and deployed vaccines to prevent disease caused by influenza, meningococcus, and adenoviruses. In 1994, the Adenovirus Vaccine manufacturer stopped its production. By 1999, supplies were exhausted and adenovirus-associated disease, especially serotype 4-associated febrile respiratory illness, returned to basic training installations. Advisory bodies persuaded Department of Defense leaders to initiate restoration of Adenovirus Vaccine. In 2011, after 10 years of effort by government and contractor personnel and at a cost of about $100 million, the Adenovirus Vaccine was restored to use at all military basic training installations. Disease and adenovirus serotype 4 isolation rates have fallen dramatically since vaccinations resumed in October 2011 and remain very low. Mindful of the adage that "The more successful a vaccine is, the more quickly the need for it will be forgotten.", sustainment of the supply of the Adenovirus Vaccine may be a challenge, and careful management will be required for such sustainment. Copyright © 2012 Elsevier Ltd. All rights reserved.
Sediment transport on Cape Sable, Everglades National Park, Florida
Zucker, Mark; Boudreau, Carrie
2010-01-01
The Cape Sable peninsula is located on the southwestern tip of the Florida peninsula within Everglades National Park (ENP). Lake Ingraham, the largest lake within Cape Sable, is now connected to the Gulf of Mexico and western Florida Bay by canals built in the early 1920's. Some of these canals breached a natural marl ridge located to the north of Lake Ingraham. These connections altered the landscape of this area allowing for the transport of sediments to and from Lake Ingraham. Saline intrusion into the formerly fresh interior marsh has impacted the local ecology. Earthen dams installed in the 1950's and 1960's in canals that breached the marl ridge have repeatedly failed. Sheet pile dams installed in the early 1990's subsequently failed resulting in the continued alteration of Lake Ingraham and the interior marsh. The Cape Sable Canals Dam Restoration Project, funded by ENP, proposes to restore the two failed dams in Lake Ingraham. The objective of this study was to collect discharge and water quality data over a series of tidal cycles and flow conditions to establish discharge and sediment surrogate relations prior to initiating the Cape Sable Canals Dam Restoration Project. A dry season synoptic sampling event was performed on April 27-30, 2009.
Mino, Takuya; Maekawa, Kenji; Ueda, Akihiro; Higuchi, Shizuo; Sejima, Junichi; Takeuchi, Tetsuo; Hara, Emilio Satoshi; Kimura-Ono, Aya; Sonoyama, Wataru; Kuboki, Takuo
2015-04-01
The aim of this article was to investigate the accuracy in the reproducibility of full-arch implant provisional restorations to final restorations between a 3D Scan/CAD/CAM technique and the conventional method. We fabricated two final restorations for rehabilitation of maxillary and mandibular complete edentulous area and performed a computer-based comparative analysis of the accuracy in the reproducibility of the provisional restoration to final restoration between a 3D scanning and CAD/CAM (Scan/CAD/CAM) technique and the conventional silicone-mold transfer technique. Final restorations fabricated either by the conventional or Scan/CAD/CAM method were successfully installed in the patient. The total concave/convex volume discrepancy observed with the Scan/CAD/CAM technique was 503.50mm(3) and 338.15 mm(3) for maxillary and mandibular implant-supported prostheses (ISPs), respectively. On the other hand, total concave/convex volume discrepancy observed with the conventional method was markedly high (1106.84 mm(3) and 771.23 mm(3) for maxillary and mandibular ISPs, respectively). The results of the present report suggest that Scan/CAD/CAM method enables a more precise and accurate transfer of provisional restorations to final restorations compared to the conventional method. Copyright © 2014 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.
Hydrologic response of streams restored with check dams in the Chiricahua Mountains, Arizona
Norman, Laura M.; Brinkerhoff, Fletcher C.; Gwilliam, Evan; Guertin, D. Phillip; Callegary, James B.; Goodrich, David C.; Nagler, Pamela L.; Gray, Floyd
2016-01-01
In this study, hydrological processes are evaluated to determine impacts of stream restoration in the West Turkey Creek, Chiricahua Mountains, southeast Arizona, during a summer-monsoon season (June–October of 2013). A paired-watershed approach was used to analyze the effectiveness of check dams to mitigate high flows and impact long-term maintenance of hydrologic function. One watershed had been extensively altered by the installation of numerous small check dams over the past 30 years, and the other was untreated (control). We modified and installed a new stream-gauging mechanism developed for remote areas, to compare the water balance and calculate rainfall–runoff ratios. Results show that even 30 years after installation, most of the check dams were still functional. The watershed treated with check dams has a lower runoff response to precipitation compared with the untreated, most notably in measurements of peak flow. Concerns that downstream flows would be reduced in the treated watershed, due to storage of water behind upstream check dams, were not realized; instead, flow volumes were actually higher overall in the treated stream, even though peak flows were dampened. We surmise that check dams are a useful management tool for reducing flow velocities associated with erosion and degradation and posit they can increase baseflow in aridlands.
Chris Ringo; Alan A. Ager; Michelle A. Day; Sarah Crim
2016-01-01
Understanding the capacity to reduce wildfire risk and restore dry forests on Western national forests is a key part of prioritizing new accelerated restoration programs initiated by the Forest Service. Although a number of social and biophysical factors influence the ability to implement restoration programs, one key driver is the suite of forest plan land...
Januchowski-Hartley, Stephanie Renee; Moon, Katie; Stoeckl, Natalie; Gray, Sally
2012-11-15
Private land conservation is an essential component of conservation that requires organizing both protection and restoration actions accordingly. Yet private land conservation programs are often formulated to generate public benefits, with inadequate consideration of costs or benefits to private landholders. Landholders' willingness to participate in conservation programs depends on a complex set of social factors, and the benefits they expect from participation. However, these two attributes are commonly evaluated independent of one another. We addressed this limitation through interviews aimed at determining landholders': 1) willingness to participate in restoration programs; 2) barriers to participation; 3) prioritization of proposed riverine restoration actions; 4) expected public or private benefits for undertaking proposed riverine restoration actions; and 5) most preferred incentive for undertaking proposed restoration actions on their land. Our results revealed four main findings. First, landholders stated that biases towards ecological rather than production outcomes, impractical programs, and government mistrust (structural factors) were the major barriers that prevented them from participating in riverine restoration on their land. Second, private benefits influenced landholders' willingness to engage riverine restoration. Third, 'a sense of stewardship and improved landscape aesthetics' (an internal factor) was the most commonly reported private benefit. Fourth, the most preferred incentives for high priority restoration actions were cash for on-ground works, extension and community recognition. We highlight the importance of designing private land conservation programs that align with landholders' priorities and deliver public benefits. Copyright © 2012 Elsevier Ltd. All rights reserved.
Adaptive Optics Image Restoration Based on Frame Selection and Multi-frame Blind Deconvolution
NASA Astrophysics Data System (ADS)
Tian, Yu; Rao, Chang-hui; Wei, Kai
Restricted by the observational condition and the hardware, adaptive optics can only make a partial correction of the optical images blurred by atmospheric turbulence. A postprocessing method based on frame selection and multi-frame blind deconvolution is proposed for the restoration of high-resolution adaptive optics images. By frame selection we mean we first make a selection of the degraded (blurred) images for participation in the iterative blind deconvolution calculation, with no need of any a priori knowledge, and with only a positivity constraint. This method has been applied to the restoration of some stellar images observed by the 61-element adaptive optics system installed on the Yunnan Observatory 1.2m telescope. The experimental results indicate that this method can effectively compensate for the residual errors of the adaptive optics system on the image, and the restored image can reach the diffraction-limited quality.
The mindful nurse leader: Improving processes and outcomes; restoring joy to nursing.
Pipe, Teri; FitzPatrick, Kate; Doucette, Jeffrey N; Cotton, Amy; Arnow, Debra
2016-09-01
In this first installment of a three-part series on mindfulness, we describe a dynamic project aimed at elevating the importance of mindfulness, compassion, and presence as key competencies for professional nurses across the career span in all healthcare settings.
14 CFR 21.335 - Responsibilities of exporters.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...
14 CFR 21.335 - Responsibilities of exporters.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...
14 CFR 21.335 - Responsibilities of exporters.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...
14 CFR 21.335 - Responsibilities of exporters.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT CERTIFICATION PROCEDURES FOR PRODUCTS AND PARTS Export Airworthiness Approvals § 21.335... packaging; (c) Remove or cause to be removed any temporary installation incorporated on an aircraft for the purpose of export delivery and restore the aircraft to the approved configuration upon completion of the...
Habitat Restoration on Mobile Bay
NASA Astrophysics Data System (ADS)
Murphy, B.
2017-12-01
Alabama has some of the most biodiversity found anywhere in our nation, however we are rapidly losing many of these species to habitat loss. Our marine science class realized our shoreline on our campus on Mobile Bay was disappearing and wanted to help. We collaborated with local scientists from Dauphin Island Sea Lab under the direction of Dr. Just Cebrian and our instructor, Dr. Megan McCall, to create a project to help restore the habitat. We had to first collect beach profile surveys and learn how to measure elevations. Next we installed plants that we measured and collected growth data. Our project went through a series of prototypes and corrective measures based on the type of wave energy we discovered on our shores. Finally we landed on a type of wave attenuator of crab traps filled with rock and staked into the sand. This coming year we will begin collecting data on any changes to the beach profile as well as fish counts to evaluate the effectiveness of our installation.
1991-10-01
reflect the official position of the Air Force. "Accezoi a - . . . .. . NT:S C2 I - DTIC IA .; Ui’avll’ .- -, JJstificatin. By Dist ... . Al-4 , t...6625 SA 23 2 52 sm 30 LEGEND -122 .ANEAC D 42T 20Go4 824O SA ITE a- CHI LI SAU r41E FEC Fiur -. LoctinGfENDusra S-124 RA IA N SO POnATION material...V V V V aS 00 Sn 1 0 - 1.I 5 V I4 . V V VV V V V - V v vV VV ’A NS 11V V V WV 0 0- 44m N 0 C4 90 1, - All IA 0 000000000000 000 00 A-1.00444.5
Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter
NASA Astrophysics Data System (ADS)
Hnat, J. A.
1980-07-01
This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.
50 CFR 84.20 - What are the grant eligibility requirements?
Code of Federal Regulations, 2011 CFR
2011-10-01
... restoration, enhancement, or management of coastal wetlands ecosystems, providing restoration, enhancement, or... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM NATIONAL COASTAL WETLANDS CONSERVATION GRANT PROGRAM Applying for Grants § 84.20 What are the grant eligibility requirements...
24 CFR 3286.511 - Inspector qualifications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Inspection of Installations in HUD-Administered... a manufactured home that is subject to the requirements of the HUD-administered installation program: (1) A manufactured home or residential building inspector employed by the local authority having...
NASA Astrophysics Data System (ADS)
Bezruchko, Konstantin; Davidov, Albert
2009-01-01
In the given article scientific and technical complex for modeling, researching and testing of rocket-space vehicles' power installations which was created in Power Source Laboratory of National Aerospace University "KhAI" is described. This scientific and technical complex gives the opportunity to replace the full-sized tests on model tests and to reduce financial and temporary inputs at modeling, researching and testing of rocket-space vehicles' power installations. Using the given complex it is possible to solve the problems of designing and researching of rocket-space vehicles' power installations efficiently, and also to provide experimental researches of physical processes and tests of solar and chemical batteries of rocket-space complexes and space vehicles. Scientific and technical complex also allows providing accelerated tests, diagnostics, life-time control and restoring of chemical accumulators for rocket-space vehicles' power supply systems.
24 CFR 3286.411 - Certifying installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Responsibilities of Installation in...; or (ii) An installation design and instructions that have been prepared and certified by a...
C. Klamath Bird Observatory and USFS Pacific Southwest Research Station
2013-01-01
The Trinity River Restoration Program began in 2000 with the goal of restoring the Trinity River's salmon and steelhead fisheries, which were severely degraded during the last half-century as a result of dams, water diversions under the Central Valley Project, and land-use practices such as gold mining. The restoration program, as outlined in the U.S. Department...
The RESTORE program of restorative justice for sex crimes: vision, process, and outcomes.
Koss, Mary P
2014-06-01
The article reports empirical evaluation of RESTORE, a restorative justice (RJ) conferencing program adapted to prosecutor-referred adult misdemeanor and felony sexual assaults. RESTORE conferences included voluntary enrollment, preparation, and a face-to-face meeting where primary and secondary victims voice impacts, and responsible persons acknowledge their acts and together develop a re-dress plan that is supervised for 1 year. Process data included referral and consent rates, participant characteristics, observational ratings of conferences compared with program design, services delivered, and safety monitoring. Outcome evaluation used 22 cases to assess (a) pre-post reasons for choosing RESTORE, (b) preparation and conference experiences, (c) overall program and justice satisfaction, and (d) completion rates. This is the first peer-reviewed quantitative evaluation of RJ conferencing for adult sexual assault. Although the data have limitations, the results support cautious optimism regarding feasibility, safety, and satisfactory outcomes. They help envision how conferencing could expand and individualize justice options for sexual assault.
How economics can further the success of ecological restoration.
Iftekhar, Md Sayed; Polyakov, Maksym; Ansell, Dean; Gibson, Fiona; Kay, Geoffrey M
2017-04-01
Restoration scientists and practitioners have recently begun to include economic and social aspects in the design and investment decisions for restoration projects. With few exceptions, ecological restoration studies that include economics focus solely on evaluating costs of restoration projects. However, economic principles, tools, and instruments can be applied to a range of other factors that affect project success. We considered the relevance of applying economics to address 4 key challenges of ecological restoration: assessing social and economic benefits, estimating overall costs, project prioritization and selection, and long-term financing of restoration programs. We found it is uncommon to consider all types of benefits (such as nonmarket values) and costs (such as transaction costs) in restoration programs. Total benefit of a restoration project can be estimated using market prices and various nonmarket valuation techniques. Total cost of a project can be estimated using methods based on property or land-sale prices, such as hedonic pricing method and organizational surveys. Securing continuous (or long-term) funding is also vital to accomplishing restoration goals and can be achieved by establishing synergy with existing programs, public-private partnerships, and financing through taxation. © 2016 Society for Conservation Biology.
ERIC Educational Resources Information Center
Schumacher, Martha Ann
2012-01-01
Restorative Practices and Restorative Justice programs in schools are a new and emerging field. Meeting in Circles to build community, resolve conflict, and learn interactively are core components of these programs. This ethnographic study, which took place February 2010 to December 2011, evaluates 12 small, out-of-classroom Talking Circles for 60…
NASA Astrophysics Data System (ADS)
O'Donnell, F. C.; Springer, A. E.; Sankey, T.; Masek Lopez, S.
2014-12-01
Forest restoration projects are being planned for large areas of overgrown semi-arid ponderosa pine forests of the Southwestern US. Restoration involves the thinning of smaller trees and prescribed or managed fire to reduce tree density, restore a more natural fire regime, and decrease the risk of catastrophic wildfire. The stated goals of these projects generally reduced plant water stress and improvements in hydrologic function. However, little is known about how to design restoration treatments to best meet these goals. As part of a larger project on snow cover, soil moisture, and groundwater recharge, we measured soil moisture, an indicator of plant water status, in four pairs of control and restored sites near Flagstaff, Arizona. The restoration strategies used at the sites range in both amount of open space created and degree of clustering of the remaining trees. We measured soil moisture using 30 cm vertical time domain reflectometry probes installed on 100 m transects at 5 m intervals so it would be possible to analyze the spatial pattern of soil moisture. Soil moisture was higher and more spatially variable in the restored sites than the control sites with differences in spatial pattern among the restoration types. Soil moisture monitoring will continue until the first snow fall, at which point measurements of snow depth and snow water equivalent will be made at the same locations.
24 CFR 3286.111 - Installer certification of installation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... manufactured home has been installed in accordance with: (i) An installation design and instructions that have... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Certification of Installation in HUD...; or (ii) An installation design and instructions that have been prepared and certified by a...
NASA Astrophysics Data System (ADS)
McCoy, Amy L.; Holmes, S. Rankin; Boisjolie, Brett A.
2018-03-01
Securing environmental flows in support of freshwater biodiversity is an evolving field of practice. An example of a large-scale program dedicated to restoring environmental flows is the Columbia Basin Water Transactions Program in the Pacific Northwest region of North America, which has been restoring flows in dewatered tributary habitats for imperiled salmon species over the past decade. This paper discusses a four-tiered flow restoration accounting framework for tracking the implementation and impacts of water transactions as an effective tool for adaptive management. The flow restoration accounting framework provides compliance and flow accounting information to monitor transaction efficacy. We review the implementation of the flow restoration accounting framework monitoring framework to demonstrate (a) the extent of water transactions that have been implemented over the past decade, (b) the volumes of restored flow in meeting flow targets for restoring habitat for anadromous fish species, and (c) an example of aquatic habitat enhancement that resulted from Columbia Basin Water Transactions Program investments. Project results show that from 2002 to 2015, the Columbia Basin Water Transactions Program has completed more than 450 water rights transactions, restoring approximately 1.59 million megaliters to date, with an additional 10.98 million megaliters of flow protected for use over the next 100 years. This has resulted in the watering of over 2414 stream kilometers within the Columbia Basin. We conclude with a discussion of the insights gained through the implementation of the flow restoration accounting framework. Understanding the approach and efficacy of a monitoring framework applied across a large river basin can be informative to emerging flow-restoration and adaptive management efforts in areas of conservation concern.
McCoy, Amy L; Holmes, S Rankin; Boisjolie, Brett A
2018-03-01
Securing environmental flows in support of freshwater biodiversity is an evolving field of practice. An example of a large-scale program dedicated to restoring environmental flows is the Columbia Basin Water Transactions Program in the Pacific Northwest region of North America, which has been restoring flows in dewatered tributary habitats for imperiled salmon species over the past decade. This paper discusses a four-tiered flow restoration accounting framework for tracking the implementation and impacts of water transactions as an effective tool for adaptive management. The flow restoration accounting framework provides compliance and flow accounting information to monitor transaction efficacy. We review the implementation of the flow restoration accounting framework monitoring framework to demonstrate (a) the extent of water transactions that have been implemented over the past decade, (b) the volumes of restored flow in meeting flow targets for restoring habitat for anadromous fish species, and (c) an example of aquatic habitat enhancement that resulted from Columbia Basin Water Transactions Program investments. Project results show that from 2002 to 2015, the Columbia Basin Water Transactions Program has completed more than 450 water rights transactions, restoring approximately 1.59 million megaliters to date, with an additional 10.98 million megaliters of flow protected for use over the next 100 years. This has resulted in the watering of over 2414 stream kilometers within the Columbia Basin. We conclude with a discussion of the insights gained through the implementation of the flow restoration accounting framework. Understanding the approach and efficacy of a monitoring framework applied across a large river basin can be informative to emerging flow-restoration and adaptive management efforts in areas of conservation concern.
The U.S. Environmental Protection Agency today announced a major grant to Restore America’s Estuaries under the Southeast New England Program (SNEP) of $3,945,172. With this grant, Restore America’s Estuaries will manage a competitive sub-award gr
Code of Federal Regulations, 2011 CFR
2011-01-01
... restored on the land under a CRP contract, or under a Federal or State wetland restoration program with an... AGRICULTURE WATER RESOURCES EMERGENCY WETLANDS RESERVE PROGRAM § 623.4 Eligible land. (a) Except as otherwise... condition and repairing related floodwater control systems; (3) Is likely to have its wetland value restored...
Wu, Zhitao; Wu, Jianjun; He, Bin; Liu, Jinghui; Wang, Qianfeng; Zhang, Hong; Liu, Yong
2014-10-21
To improve the ecological conditions, the Chinese government adopted six large-scale ecological restoration programs including 'Three-North Shelterbelt Project', "Grain for Green Project" and "Beijing-Tianjin Sand Source Control Project". Meanwhile, these ecologically vulnerable areas have experienced frequent droughts. However, little attention has been paid to the impact of drought on the effectiveness of these programs. Taking Beijing-Tianjin Sand Source Region (BTSSR) as study area, we investigated the role of droughts and ecological restoration program on trends of vegetation activities and to address the question of a possible "drought signal" in assessing effectiveness of ecological restoration program. The results demonstrate the following: (1) Vegetation activity increased in the BTSSR during 2000-2010, with 58.44% of the study area showing an increased NDVI, of which 11.80% had a significant increase at 0.95 confidential level. The decreasing NDVI trends were mainly concentrated in a southwest-to-northeast strip in the study area. (2) Drought was the main driving force for a decreasing trend of vegetation activity in the southwest-to-northeast regions of the BTSSR at the regional and spatial scales. Summer droughts in 2007 and 2009 contributed to the decreasing trend in NDVI. The severe and extreme droughts in summer reduced the NDVI by approximately 13.06% and 23.55%, respectively. (3) The residual analysis result showed that human activities, particularly the ecological restoration programs, have a positive impact on vegetation change. Hence, the decreasing trends in the southwest-to-northeast regions of the BTSSR cannot be explained by the improper ecological restoration program and is partly explained by droughts, especially summer droughts. Therefore, drought offset the ecological restoration program-induced increase in vegetation activity in the BTSSR.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Diefenderfer, Heida L.; Borde, Amy B.; Sinks, Ian A.
The purpose of this study was to provide science-based information to practitioners and managers of restoration projects in the Columbia Estuary Ecosystem Restoration Program (CEERP) regarding aspects of restoration techniques that currently pose known challenges and uncertainties. The CEERP is a program of the Bonneville Power Administration (BPA) and the U.S. Army Corps of Engineers (Corps), Portland District, in collaboration with the National Marine Fisheries Service and five estuary sponsors implementing restoration. The estuary sponsors are Columbia Land Trust, Columbia River Estuary Study Taskforce, Cowlitz Tribe, Lower Columbia Estuary Partnership, and Washington Department of Fish and Wildlife. The scope ofmore » the research conducted during federal fiscal year 2015 included three aspects of hydrologic reconnection that were selected based on available scientific information and feedback from restoration practitioners during project reviews: the design of mounds (also called hummocks, peninsulas, or berms); the control of reed canarygrass (Phalaris arundinaceae); and aspects of channel network design related to habitat connectivity for juvenile salmonids.« less
Ecosystem biomass, carbon, and nitrogen five years after restoration with municipal solid waste
USDA-ARS?s Scientific Manuscript database
Escalating municipal solid waste generation coupled with decreasing landfill space needed for disposal has increased the pressure on military installations to evaluate novel approaches to handle this waste. One approach to alleviating the amount of municipal solid waste being landfilled is the use o...
32 CFR 202.11 - Documenting RAB activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Documenting RAB activities. 202.11 Section 202.11 National Defense Department of Defense (Continued) OFFICE OF THE SECRETARY OF DEFENSE (CONTINUED) MISCELLANEOUS RESTORATION ADVISORY BOARDS Operating Requirements § 202.11 Documenting RAB activities. (a) The installation shall document information...
32 CFR 203.18 - Conflict of interest and disclosure requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 2 2010-07-01 2010-07-01 false Conflict of interest and disclosure requirements... ENVIRONMENTAL RESTORATION ACTIVITIES § 203.18 Conflict of interest and disclosure requirements. The Department... bid or proposal: (a) Information on its financial and business relationship with the installation, RAB...
Installation of best management practices (BMPs) in watersheds or streams is widely used as a means of reducing, eliminating, or controlling the input of human-based physical, chemical, or hydrologic stressors to those systems. Although BMPs may be effective in managing a partic...
USE OF DRILLING FLUIDS IN MONITORING WELL NETWORK INSTALLATION: LANL AND OPEN DISCUSSION
Personnel at the EPA Ground Water and Ecosystems Restoration Division (GWERD) were requested by EPA Region 6 to provide a technical analysis of the impacts of well drilling practices implemented at the Los Alamos National Laboratory (LANL) as part of the development of their grou...
Predicting velocity in bendway weir eddy fields
Kristoph-Dietrich Kinzli; Christopher I. Thornton
2010-01-01
Rehabilitation of the Middle Rio Grande (MRG) in central New Mexico has become necessary because of changes in morphology resulting from the installation of dams, and because of habitat restoration considerations for the endangered Rio Grande silvery minnow (Hybognathus amarus). Bendway weirs are erosion control and channel-stabilization structures placed transverse to...
50 CFR 86.91 - What are my program crediting responsibilities?
Code of Federal Regulations, 2012 CFR
2012-10-01
... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.91 What are my program crediting responsibilities? You should give public credit to the Federal Aid in Sport Fish...
50 CFR 86.91 - What are my program crediting responsibilities?
Code of Federal Regulations, 2011 CFR
2011-10-01
... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.91 What are my program crediting responsibilities? You should give public credit to the Federal Aid in Sport Fish...
50 CFR 86.91 - What are my program crediting responsibilities?
Code of Federal Regulations, 2010 CFR
2010-10-01
... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.91 What are my program crediting responsibilities? You should give public credit to the Federal Aid in Sport Fish...
Restoration in Sand-slugged Streams and Drought---the Granite Creeks Project.
NASA Astrophysics Data System (ADS)
Lake, P. S.; Bond, N.; Glaister, A.; Downes, B.
2005-05-01
European settlement, with accompanying land clearance and heavy grazing, of the Strathbogie Ranges in central Victoria, Australia, resulted in the massive export of sediment to lowland streams. These streams, originally configured as "chains of ponds", were filled with "sand slugs" that generated a raised flat streambed depleted in habitat heterogeneity. The invertebrate fauna of the sand slugs is similar to that of sandbed streams elsewhere, but lacks an abundant hyporheos. The fish fauna was reduced in diversity and abundance. In 2001 habitat restoration in the sand slugs commenced after pre-restoration samples were taken.Timber structures, made from railway sleepers, were installed and subsequently created scour pools. Fish responded positively to restoration measure, but no significant effect was apparent for the invertebrates. In 2001-2004 a very severe drought occurred causing the streams to cease to flow and in the sand-slugged sections faunal abundance declined greatly due to the loss of residential habitat and the lack of refugia. Thus, the large-scale effects of severe drought thwarted the effects of localized habitat restoration, stressing the point that in restoring habitat it is also imperative to generate resilience to the prevailing disturbance regime-a regime that may be exacerbated by human activities.
2009-06-01
Corps super- vision regarding management practices such as cropping systems and cattle grazing. Also, the Corps’ focus at the time was on tree planting...on crop rotation and removal of grazing. Changes included the installation of 100-ft-wide warm-season native grass strips between each agricultural...brood-rearing habitat, but it was not always possible to put that much land aside. Idle fields consisted of 5- to 15-acre blocks centered in row crop
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blaylock, B.P.; Legg, J.; Travis, C.C.
1995-06-01
This document describes a worker health risk evaluation methodology for assessing risks associated with Environmental Restoration (ER) and Waste Management (WM). The methodology is appropriate for estimating worker risks across the Department of Energy (DOE) Complex at both programmatic and site-specific levels. This document supports the worker health risk methodology used to perform the human health risk assessment portion of the DOE Programmatic Environmental Impact Statement (PEIS) although it has applications beyond the PEIS, such as installation-wide worker risk assessments, screening-level assessments, and site-specific assessments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
The 13,130-acre Elmendorf Air Force Base (AFB) site is located adjacent to the municipality of Anchorage, Alaska. From 1940 to 1991, Elmendorf AFB used a 20-acre portion of the site, referred to as source area ST41, to store the fuel product JP-4 and aviation gasoline in four 1-million gallon underground tanks. As a result of numerous leaks and above-ground spills since the tanks were installed in the 1940s, USAF conducted investigations through its Installation Restoration Program (IRP). These investigations revealed several hundred thousand gallons of fuel in the ground water and soil. The ROD addresses an interim remedy at Elmendorfmore » AFB. The action is needed to reduce further spread of fuel constituents through the recovery of floating product on the ground water surface, and containment of seeps. Future RODs will include a final remedy for ground water and soil at ST41, as OU2, and will address the other six OUs at the site. The primary contaminants of concern affecting the ground water at ST41 are the compounds in JP-4, especially VOCs such as benzene, toluene, and xylenes. The selected interim remedial action for the site are included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-06-16
The 7-acre Mountain Home Air Force Base (AFB) site was a fire department training area located in Mountain Home, Elmore County, Idaho. From 1962 to 1975, the Mountain Home Air Force Base used the site for fire department training exercises. Each exercise began by saturating the bermed training area with water, followed directly by applying 250 to 500 gallons of fuel. The flames were extinguished with Aqueous Film Forming Foam (AFFF), or prior to 1972, with a water-based protein foam. The training session was completed with a post-exercise ignition of the residual fuel in a bermed area. The USAF investigationsmore » identified solvents and petroleum, oil, lubricant (POL) wastes in the soil. Under the Installation Restoration Program (IRP), the USAF conducted a record search, drilling, and sampling of soil borings to bedrock, the installation of monitoring wells, and hand auger samples. The ROD provided a final remedy for onsite soil as OU4. Because contaminants were found at such low concentrations, the soil was covered by crushed asphalt and has little potential to impact ecological receptors. The soil posed low risks for humans at the site and no remediation was necessary.« less
Smoke Alarm Giveaway and Installation Programs
Liu, Ying; Mack, Karin A.; Diekman, Shane T.
2015-01-01
Background The burden of residential fire injury and death is substantial. Targeted smoke alarm giveaway and installation programs are popular interventions used to reduce residential fire mortality and morbidity. Purpose To evaluate the cost effectiveness and cost benefit of implementing a giveaway or installation program in a small hypothetic community with a high risk of fire death and injury through a decision-analysis model. Methods Model inputs included program costs; program effectiveness (life-years and quality-adjusted life-years saved); and monetized program benefits (medical cost, productivity, property loss and quality-of-life losses averted) and were identified through structured reviews of existing literature (done in 2011) and supplemented by expert opinion. Future costs and effectiveness were discounted at a rate of 3% per year. All costs were expressed in 2011 U.S. dollars. Results Cost-effectiveness analysis (CEA) resulted in anaverage cost-effectiveness ratio (ACER) of $51,404 per quality-adjusted life-years (QALYs) saved and $45,630 per QALY for the giveaway and installation programs, respectively. Cost–benefit analysis (CBA) showed that both programs were associated with a positive net benefit with a benefit–cost ratio of 2.1 and 2.3, respectively. Smoke alarm functional rate, baseline prevalence of functional alarms, and baseline home fire death rate were among the most influential factors for the CEA and CBA results. Conclusions Both giveaway and installation programs have an average cost-effectiveness ratio similar to or lower than the median cost-effectiveness ratio reported for other interventionsto reduce fatal injuries in homes. Although more effort is required, installation programs result in lower cost per outcome achieved compared with giveaways. PMID:22992356
7 CFR 625.4 - Program requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... activities that promote the restoration, protection, enhancement, maintenance, and management of forest... of successful restoration, enhancement, and protection of forest ecosystem functions and values when... AGRICULTURE WATER RESOURCES HEALTHY FORESTS RESERVE PROGRAM § 625.4 Program requirements. (a) General. Under...
NASA Technical Reports Server (NTRS)
Soldatov, A. D.; Finogeyev, V. I.
1980-01-01
The effects of different regimens of treatment following prolonged hypokinesia were studied in order to determine the most effective program. The types of programs considered were passive means, consisting of physical therapy; active means, consisting of athletic training; and a combined program. In the first stage of the experiment, the effects of a 10 day period of hypokinesia were studied. It was determined that the restoration programs must address the problems of: (1) increasing defense function and general tone of the body; (2) restore orthostatic stability; and (3) increase general endurance. In later stages, groups of athletes and nonathletes underwent 30 day periods of hypokinesia. Restoration was carefully monitored for groups treated with the various regimens. It was determined that the most effective treatment was a comprehensive program of passive and active therapy.
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
Motivation and Outcomes for University Students in a Restorative Justice Program
ERIC Educational Resources Information Center
Gallagher Dahl, Meghan; Meagher, Peter; Vander Velde, Stacy
2014-01-01
A restorative justice program (RJP) was developed at a large university in the housing student conduct office. Students accused of misconduct who participated in a restorative justice (RJ) conference completed surveys regarding their motivations and perceived outcomes. Results showed that students who were motivated to make reparations to others…
2013-01-01
moderate in magnitude on air quality, noise, Air Installation Compatible Use Zone program soils , wetlands, surface water, floodplains, vegetation, fish...magnitude, on air quality, noise, Air Installation Compatible Use Zone program, soils , wetlands, smf ace water, floodplains, vegetation, fish and wildlife...range from negligible to moderate in magnitude on air quality, noise, Air Installation Compatible Use Zone program, soils , wetlands, surface water
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bujewski, G.E.; Johnson, R.L.
1996-04-01
Adaptive sampling programs provide real opportunities to save considerable time and money when characterizing hazardous waste sites. This Strategic Environmental Research and Development Program (SERDP) project demonstrated two decision-support technologies, SitePlanner{trademark} and Plume{trademark}, that can facilitate the design and deployment of an adaptive sampling program. A demonstration took place at Joliet Army Ammunition Plant (JAAP), and was unique in that it was tightly coupled with ongoing Army characterization work at the facility, with close scrutiny by both state and federal regulators. The demonstration was conducted in partnership with the Army Environmental Center`s (AEC) Installation Restoration Program and AEC`s Technology Developmentmore » Program. AEC supported researchers from Tufts University who demonstrated innovative field analytical techniques for the analysis of TNT and DNT. SitePlanner{trademark} is an object-oriented database specifically designed for site characterization that provides an effective way to compile, integrate, manage and display site characterization data as it is being generated. Plume{trademark} uses a combination of Bayesian analysis and geostatistics to provide technical staff with the ability to quantitatively merge soft and hard information for an estimate of the extent of contamination. Plume{trademark} provides an estimate of contamination extent, measures the uncertainty associated with the estimate, determines the value of additional sampling, and locates additional samples so that their value is maximized.« less
50 CFR 86.91 - What are my program crediting responsibilities?
Code of Federal Regulations, 2014 CFR
2014-10-01
... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.91 What are my program crediting responsibilities? You should give public credit to the Federal Aid in Sport Fish...
50 CFR 86.91 - What are my program crediting responsibilities?
Code of Federal Regulations, 2013 CFR
2013-10-01
... THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM State Use of Signs and Sport Fish Restoration Symbols § 86.91 What are my program crediting responsibilities? You should give public credit to the Federal Aid in Sport Fish...
Ballesteros, Michael F; Jackson, Mark L; Martin, Maurice W
2005-01-01
To address residential fires and related injuries, the Centers for Disease Control and Prevention funds state health departments to deliver a Smoke Alarm Installation and Fire Safety Education (SAIFE) program in high-risk homes in 16 states. This program involves recruiting local communities and community partners, hiring a local coordinator, canvassing neighborhood homes, installing long-lasting lithium-powered smoke alarms, and providing general fire safety education and 6-month follow-up to determine alarm functionality. Local fire departments are vital community partners in delivering this program. Since the program's inception, more than 212,000 smoke alarms have been installed in more than 126,000 high-risk homes. Additionally, approximately 610 lives have potentially been saved as a result of a program alarm that provided early warning to a dangerous fire incident.