DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-18
The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.
DOT National Transportation Integrated Search
2016-09-01
The objectives of this study are to develop and deploy a means for cost-effectively extracting curve information using the widely available GPS and GIS data to support high friction surface treatment (HFST) installation recommendations (i.e., start a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-04-01
This report presents the findings of Remedial Investigations and Feasibility Studies at sites located at the Point Lonely radar installation in northern Alaska. The sites were characterized based on sampling and analyses conducted during Remedial Investigation activities performed during August and September 1993.
Purchase and Installation of NanoSIMS 50
NASA Technical Reports Server (NTRS)
Walker, Robert M.
2001-01-01
Although this is a final report on NASA grant number NAG5-8729 we wish to state at the outset that it was mistakenly written as a two-year grant instead of a three-year grant as should have been done. The grant was made for the purpose of purchasing and installing a novel ion microprobe initially called the NanoSIMS 50 and now called the NanoSIMS. The total cost to NASA for purchasing the instrument and refurbishing a laboratory to house it was $1.1 M, split into three installments of $400 (FY 1999), $350K (FY2000), and $350K (FY-2001). We received the first installment in full and $335K in FY2000 for the second installment. The final $350K necessary to complete the purchase and installation was expected by us in the spring of 2001. However, we were recently informed that no more money can be transferred on this grant since it was originally written as a two-year grant. Therefore, we are closing out the current grant and simultaneously writing a new proposal to obtain the final $350K needed to complete the purchase.
Cathodic Protection Field Trials on Prestressed Concrete Components, Final Report
DOT National Transportation Integrated Search
1998-01-01
This is the final report in a study to demonstrate the feasibility of using cathodic protection (CP) on concrete bridge structures containing prestressed steel. The interim report, FHWA-RD-95-032, has more details on the installation of selected CP s...
Improving materials and methods for installing inductive loop detectors : final report.
DOT National Transportation Integrated Search
1986-06-01
This report is the final report of this research project. It describes a compiling of materials utilized by various agencies for use in formation of inductive loop detectors. It further lists methods by which different agencies install materials in o...
The influence of installation angle of GGIs on full-tensor gravity gradient measurement
NASA Astrophysics Data System (ADS)
Wei, Hongwei; Wu, Meiping
2018-03-01
Gravity gradient plays an important role in many disciplines as a fundamental signal to reflect the information of the earth. Full-tensor gravity gradient measurement (FGGM) is an effective way to obtain the gravity gradient signal. In this paper, the installation mode of GGIs in FGGM is studied. It is expected that the accuracy of FGGM will be improved by optimizing the installation mode of GGIs. In addition, we analysed the relationship between GGIs’ installation angle and FGGM by establishing the measurement model of FGGM. Then the following conclusions was proved that there was no relationship between GGIs’ installation angle and the measurement result. This conclusion showed that there was no optimal angle for the GGIs’ installation in FGGM, and the installation angle only need to satisfy the relationship shown in the conclusion section of this paper. Finally, this conclusion was demonstrated by computer simulations.
DOT National Transportation Integrated Search
1998-05-01
The report examines the potential for developing electronic toll collection systems in Brazil. This is Volume III and it is 'Task-Recommendations and Final Report'. The report is made up of the following subtasks: (1) Issue Recommended Installation S...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-01-05
This report presents the findings of Remedial Investigations and Feasibility Studies at sites located at the Barter Island radar installation in northern Alaska. The sites were characterized based on sampling and analyses conducted during Remedial Investigation activities performed during August and September 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-02-19
This report presents the findings of Remedial Investigations and Feasibility Studies at sites located at the Point Barrow radar installation in northern Alaska. The sites were characterized based on sampling and analyses conducted during Remedial Investigation activities performed during August and September 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-06-03
This Decision Document discusses the selection of no further action as the recommended action for four sites located at the Oliktok Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the eight sites located at the Oliktok Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, four sites are recommended for no further action.
Contaminated waste incinerator modification study. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wolf, F.
1995-08-01
An explosive waste incinerator (EWI) can be installed in the existing Badger AAP Contaminated Waste Processor (CWP). An engineering evaluation of installing a rotary kiln furnace to dispose of waste energetic material has shown the installation to be possible. An extensive literature search was completed to develop the known proven methods of energetic waste disposal. Current incineration practice including thermal treatment alternatives was investigated. Existing and new equipment was reviewed for adequacy. Current CWP operations and hazardous waste to be disposed of were determined. Comparisons were made with other AAP`s EWI.
Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.
ERIC Educational Resources Information Center
Seaman, George B., Sr.
This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…
A field installation using prestressed panel subdecks.
DOT National Transportation Integrated Search
1978-01-01
This final report is a supplement to an earlier report that covered the installation of the first precast, prestressed panel subdecks installed on a bridge in Virginia. The report discusses the inspection of the decks one year after they were complet...
Voltage dips at the terminals of wind power installations
NASA Astrophysics Data System (ADS)
Bollen, Math H. J.; Olguin, Gabriel; Martins, Marcia
2005-07-01
This article gives an overview of the kind of voltage dips that can be expected at the terminals of a wind power installation. The overview is based on the study of those dips at the terminals of industrial installations and provides a guideline for the testing of wind power installations against voltage dips. For voltage dips due to faults, a classification into different types is presented. Five types appear at the terminals of sensitive equipment and thus have to be included when testing the wind power installation against disturbances coming from the grid. A distinction is made between installations connected at transmission level and those connected at distribution level. For the latter the phase angle jump has to be considered. Dips due to other causes (motor, transformer and capacitor switching) are briefly discussed as well as the voltage recovery after a dip. Finally some thoughts are presented on the way in which voltage tolerance requirements should be part of the design process for wind power installations. Copyright
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-05-03
This Decision Document discusses the selection of no further action as the recommended action for nine sites located at the Barter Island radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the 14 sites located at the Barter Island installation (U.S. Air Force 1996a,b). Based on the findings of these activities, nine sites are recommended for no further action.
Readout and Trigger for the AFP Detector at the ATLAS Experiment at LHC
NASA Astrophysics Data System (ADS)
Korcyl, K.; Kocian, M.; Lopez Paz, I.; Avoni, G.
2017-10-01
The ATLAS Forward Proton is a new detector system in ATLAS that allows study of events with protons scattered at very small angles. The final design assumes four stations at distances of 205 and 217 m from the ATLAS interaction point on both sides of the detector exploiting the Roman Pot technology. In 2016 two stations in one arm were installed; installation of the other two is planned for 2017. This article describes details of the installed hardware, firmware and software leading to the full integration with the ATLAS central trigger and data acquisition systems.
Minimization of reflection cracks, Route 17, Gloucester County : installation report 1976.
DOT National Transportation Integrated Search
1976-01-01
The installation of two fabrics, Petromat and Mirafi, to reduce reflection cracking on Route 17 in Gloucester County in- August 1976 is described. A brief review of the performance of previous installations is included. Finally, it is recommended tha...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-04
The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-05-24
This Decision Document discusses the selection of no further action as the recommended action for two sites located at the Bullen Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the five sites located at the Bullen Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, two sites are recommended for no further action. Sites at the Bullen Point radar installation recommended for no further action are: Old Landfill/Dump Site East (LF06) and Drum Storage Area (SS10).
NASA Technical Reports Server (NTRS)
Kowalski, E. J.
1979-01-01
A computerized method which utilizes the engine performance data is described. The method estimates the installed performance of aircraft gas turbine engines. This installation includes: engine weight and dimensions, inlet and nozzle internal performance and drag, inlet and nacelle weight, and nacelle drag.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, W.J.; Liddle, S.K.
1986-09-01
The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less
Pedestrian safety impacts of curb extensions : a case study : final report.
DOT National Transportation Integrated Search
2005-07-01
This report documents a case study evaluating motorist yielding behavior at a crosswalk in Albany, Oregon. In 2003 the City of Albany installed curb extensions, continental markings and advance stop bars at several uncontrolled intersections along th...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durlak, E.R.
1986-05-01
This report presents a summary of the results of site-evaluation inspection conducted at Navy, Army, and Air Force base. The solar systems evaluated included space heating, space cooling, and domestic hot water system. The systems range in size from small two-collector systems to large arrays installed on barracks, mess halls, office buildings, etc. These operational results are presented so that future designs will benefit from the lesson learned in this study.
2010-07-01
the ground source heat pump system . During installation, construction equipment would remove vegetation from the surface and disturb soil to a depth...levels of 50 to 55 dBA or higher on a daily basis. Studies specifically conducted to determine noise effects on various human activities show that about...needs to be evaluated for its potential effects on a project site and adjacent land uses. The foremost factor affecting a proposed action in terms of
1984-05-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...CHESTER PH MAY 84 UNCLASSIFIED F336 iS-80-D-4-86 F/G 5/ 1 NL I l/hlhh..E/hhE mhh~hhElhElhhI mhhmhmmhhmhl Iflf lllflflflflfllfl mhhhhhmhhmmhhu Llw 111112...w1L 1 6 MICROCOPY RESOLUTION TEST CHART NATIONIAL BUREAU OF STANDARDS- 1963-A Installation Restoration Proaram AD-A 145 352 * Final Report Phase 11
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-18
This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Bullen Point Distant Early Warning (DEW) Line radar installation. Five sites at the Bullen Point radar installation underwent remedial investigations (RIs) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Bullen Point Remedial Investigation/Feasibility Study (RI/FS) (U.S. Air Force 1996). The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessments. The primary chemicals of concern (COCs) at themore » five sites are diesel and gasoline from past spills and/or leaks.« less
Evaluating pedestrian safety improvements : final report.
DOT National Transportation Integrated Search
2012-12-01
The purpose of the study was to evaluate the impact of new pedestrian countermeasure installations on pedestrian safety to assist in informing future pedestrian safety initiatives. In order to address these objectives, the WMU team conducted a litera...
Recycled plastics in highway construction and maintenance : final report.
DOT National Transportation Integrated Search
1997-07-01
Installation and serviceability were examined for several products manufactured, in part, from recycled products. The following recommendations were reached: : The type of recycled plastic snow pole employed in this study is not recommended for gener...
Installation Restoration Program. Confirmation/Quantification Stage 1. Phase 2
1985-03-07
INSTALLATION RESTORATION PROGRAM i0 PHASE II - CONFIRMATION/QUANTIFICATION 0STAGE 1 KIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117 IIl PREPARED BY SCIENCE...APPLICATIONS INTERNATIONAL CORPORATION 505 MARQUETTE NW, SUITE 1200 ALBUQUERQUE, NEW MEXICO 871021 5MARCH 1985 FINAL REPORT FROM FEB 1983 TO MAR 1985...QUANTIFICATION STAGE 1 i FINAL REPORT FOR IKIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117U HEADQUARTERS MILITARY AIRLIFT COMMAND COMMAND SURGEON’S OFFICE (HQ MAC
75 FR 5618 - Notice of Issuance of Final Determination Concerning a Certain Alternator
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-03
... meter to measure the rotor resistance; a hi-pot test to check insulation between each phase to ground... air flow deflector; installing the rectifier sub-assembly; installing the heat shrink tubing; and...
Internally sealed concrete for bridge deck protection : final report.
DOT National Transportation Integrated Search
1983-01-01
This study investigated the characteristics of internally sealed concrete through tests on specimens fabricated in the laboratory to determine its properties and an installation in a bridge deck to assess the controls needed during construction and i...
Evaluation of joint sealant materials : final report.
DOT National Transportation Integrated Search
1977-05-01
In May, 1968, the Department's Research and Development Section initiated a project to evaluate joint sealants being marketed for use on roads and bridges. In the study, representatives of 31 companies installed 40 products primarily on one road and ...
WTS-4 system verification unit for wind/hydroelectric integration study
NASA Technical Reports Server (NTRS)
Watts, A. W.
1982-01-01
The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-04-15
This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Oliktok Point Distant Early Warning (DEW) Line radar installation. Eight sites at the Oliktok Point radar installation underwent remedial investigations (RIs) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Oliktok Point Remedial Investigation/Feasibility Study (RI/FS) (U.S. Air Force 1996). The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessments. The primary chemicals of concern (COCs) at themore » eight sites are diesel and gasoline from past spills and/or leaks, chlorinated solvents, metals, and polychlorinated biphenyls (PCBs).« less
Grid-Parity Solar Power for Department of Defense Installations
2014-02-01
MW DC. Installed capacity of panels. Capacity of 1 MW DC. Capacity = 998.4 kWp DC. Photovoltaic Peak Capacity ( Power Delivered). PVSyst... Photovoltaic Annual Output ( Power Delivered) The power delivered to Camp Roberts should match or exceed results simulated using the University of Geneva...FINAL REPORT Grid-Parity Solar Power for Department of Defense Installations ESTCP Project EW-201134 FEBRUARY 2014 John Bender
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilkerson, Andrea; Sullivan, Gregory P.; Davis, Robert G.
Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding themore » long-term performance of LED lighting systems in high-temperature environments.« less
1992-08-07
AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old
Evaluation of microwave traffic detector at the Chemawa Road/Interstate 5 interchange: final report.
DOT National Transportation Integrated Search
2002-04-01
In 2001, the Oregon Department of Transportation installed a microwave traffic detection sensor, and compared its performance to conventional inductive traffic loops. The objective of the study was to evaluate the capabilities of the microwave tra...
Solar Energy Installers Curriculum Guides. Final Report.
ERIC Educational Resources Information Center
Walker, Gene C.
A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
DOT National Transportation Integrated Search
2004-01-01
Continuous flight auger (CFA) piles better known as Augered, Cast In-Place (ACIP) piles have been widely used in the United States for several decades because of relatively rapid installation and minimum environmental impact during installation with ...
Low-cost piezoelectric weigh-in-motion systems in Oregon : 1988-1993 : final report.
DOT National Transportation Integrated Search
1994-12-01
In 1988, The Oregon Department of Transportation installed low-cost piezoelectric weigh-in-motion cables at three locations and in ten lanes on Interstate 5 and 205. This report documents the installation of the systems, problems, and results from 19...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryngelson, R.H.
Describes installation of 3 satellite subsea trees in 500 ft of water from a semisubmersible drilling rig. These wet, diver-assist trees are part of Phillips Petroleum's early development and production program (EDPP) for the Espoir field offshore Ivory Coast, with plans calling for 5 satellite wells with downhole completion equipment and subsea production trees. Diagram shows how a converted jackup, Dan Duke, supports equipment to handle production from subsea wells. Table gives time breakdown of subsea tree installation. Before mobilizing the subsea trees, control system, and tubulars to the rig, a study of deck layout, payloads, and traffic patterns wasmore » performed. Concludes that, based on experience in this project and the cost differences between purchase and installation costs, final success is 90% dependent on informed and trained field personnel after engineering, design, and manufacturing; attention to installation procedures and training of field and operational personnel are as critical or more critical than design changes to equipment; and selection of a supplier for high technology equipment, based on a low bid alone, may not translate into lower installation costs.« less
NASA's James Webb Space Telescope Primary Mirror Fully Assembled
2016-02-04
The 18th and final primary mirror segment is installed on what will be the biggest and most powerful space telescope ever launched. The final mirror installation Wednesday at NASA’s Goddard Space Flight Center in Greenbelt, Maryland marks an important milestone in the assembly of the agency’s James Webb Space Telescope. “Scientists and engineers have been working tirelessly to install these incredible, nearly perfect mirrors that will focus light from previously hidden realms of planetary atmospheres, star forming regions and the very beginnings of the Universe,” said John Grunsfeld, associate administrator for NASA’s Science Mission Directorate in Washington. “With the mirrors finally complete, we are one step closer to the audacious observations that will unravel the mysteries of the Universe.” Using a robotic arm reminiscent of a claw machine, the team meticulously installed all of Webb's primary mirror segments onto the telescope structure. Each of the hexagonal-shaped mirror segments measures just over 4.2 feet (1.3 meters) across -- about the size of a coffee table -- and weighs approximately 88 pounds (40 kilograms). Once in space and fully deployed, the 18 primary mirror segments will work together as one large 21.3-foot diameter (6.5-meter) mirror. Credit: NASA/Goddard/Chris Gunn Credits: NASA/Chris Gunn
Solar Cogeneration of Electricity and Hot Water at DoD Installations
2014-05-01
the cogeneration system displaces more energy (the impact is not 4-5X because the GHG intensity factors for offsetting electricity generation and...FINAL REPORT Solar Cogeneration of Electricity and Hot Water at DoD Installations ESTCP Project EW-201248 MAY 2014 Ratson Morad... Cogeneration of Electricity and Hot Water at DoD Installations 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d
OA-7 Final "Powered" Cargo Loading and Closeouts Banner Installation
2017-03-06
Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians perform final cargo and power installation in the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station
2008-08-13
This final rule requires all long term care facilities to be equipped with sprinkler systems by August 13, 2013. Additionally, this final rule requires affected facilities to maintain their automatic sprinkler systems once they are installed.
Evaluating the potential safety benefits of electronic hours-of-service recorders final report.
DOT National Transportation Integrated Search
2014-04-01
The purpose of the current study was to assess the benefits of installed electronic hours-of-service recorders : (EHSRs) on safety and hours-of-service (HOS) violations related to Class 7 and 8 trucks as they operated during : normal revenue service....
Experimental use of flexible guideposts in Oregon : PPM 20-6.3, Category 2 Project : final report.
DOT National Transportation Integrated Search
1974-06-25
During the early months of 1971 the Oregon State Highway Division requested and received FHWA approval to install flexible guideposts in locations where sight post losses from collisions would be expected to be high. The request was to install the fl...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
46 CFR 120.352 - Battery categories.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Battery categories. 120.352 Section 120.352 Shipping... and Distribution Systems § 120.352 Battery categories. This section applies to batteries installed to... sources of power to final emergency loads. (a) Large. A large battery installation is one connected to a...
2005-03-25
This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.
DOT National Transportation Integrated Search
2016-01-01
In an effort to address this particularly frequent and severe crash type, the Alabama Department of : Transportation (ALDOT) implemented a policy in February 2006 to widen pavements and install : milled-in rumble strips when rural two-lane highways w...
DOT National Transportation Integrated Search
2008-06-01
The objective of this research study was to perform a thorough evaluation of the feasibility and cost implications for initial system installation and ongoing program and maintenance costs for a land port of entry truck emissions program utilizing he...
Geothermal Heat Pumps Score High Marks in Schools.
ERIC Educational Resources Information Center
National Renewable Energy Lab (DOE).
Geothermal heat pumps (GHPs) are showing their value in providing lower operating and maintenance costs, energy efficiency, and superior classroom comfort. This document describes what GHPs are and the benefits a school can garner after installing a GHP system. Three case studies are provided that illustrate these benefits. Finally, the Department…
24 CFR 3285.6 - Final leveling of manufactured home.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Final leveling of manufactured home... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.6 Final leveling of manufactured home. The manufactured home must be adequately leveled prior to completion of the...
24 CFR 3285.6 - Final leveling of manufactured home.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Final leveling of manufactured home... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.6 Final leveling of manufactured home. The manufactured home must be adequately leveled prior to completion of the...
24 CFR 3285.6 - Final leveling of manufactured home.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Final leveling of manufactured home... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.6 Final leveling of manufactured home. The manufactured home must be adequately leveled prior to completion of the...
24 CFR 3285.6 - Final leveling of manufactured home.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Final leveling of manufactured home... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.6 Final leveling of manufactured home. The manufactured home must be adequately leveled prior to completion of the...
24 CFR 3285.6 - Final leveling of manufactured home.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Final leveling of manufactured home... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS General § 3285.6 Final leveling of manufactured home. The manufactured home must be adequately leveled prior to completion of the...
Conceptual design study: Cold water pipe systems for self-mounted OTEC powerplants
NASA Astrophysics Data System (ADS)
1981-02-01
The conceptual design and installation aspects of cold water pipes (CWP) systems for shelf mounted OTEC power plants in Puerto Rico and Hawaii are considered. The CWP systems using Fiberglass Reinforced Plastic (FRP) and steel were designed; the FRP, can be controlled by varying the core thickness; and steel is used as a structural material in offshore applications. A marine railway approach was chosen for installation of the CWP. Two methods for pulling the track for the railway down the pipe fairway to its final location are presented. The track is permanently fastened to the sloping seabed with piles installed by a remotely controlled cart that rides on the track itself. Both the marine railway and the shelf mounted platform that houses the OTEC power plant require an anodic or equivalent corrosion protection system.
Virtual Planning at Work: A Tour of NASA Future Flight Central
NASA Technical Reports Server (NTRS)
McClenahen, Jim; Dorighi, Nancy S. (Technical Monitor)
2000-01-01
FutureFlight Central will permit integration of tomorrow's technologies in a risk-free simulation of any airport, airfield, and tower cab environment. The facility provides an opportunity for airlines to mitigate passenger delays by fine tuning airport hub operations, gate management and ramp movement procedures. It also allows airport managers an opportunity to study effects of various improvements at their airports. Finally, it enables air traffic controllers to provide feedback and to become familiar with new airport operations and technologies before final installation.
2011-05-11
the installation of DOD Advanced Automation Systems (DAAS) and Voice Communications Switching Systems (VCSS) at DOD bases, was previously evaluated...utilities installed immediately next to the site. Operation of the DASR system is anticipated to have minimal long-term impacts to the natural and human ... humans at ground level and is not anticipated to pose ha1m to the general population. During operation of the DASR system, fuel will be stored in
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greene, J.A.
1991-06-01
A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...
ERIC Educational Resources Information Center
Appel, Victor H.; Roueche, John E.
The factors which contribute to the successful installation and assimilation of educational innovations were examined in relation to vocational/technical programs in eight post-secondary institutions. About 555 instructors, administrators, and non-teaching professional staff were surveyed regarding the level and extent of use of individualized…
75 FR 39168 - Special Regulations; Areas of the National Park System
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... his death in 1972. During the closure, we completed four projects: installation of a new HVAC system... to either bulge or crack. The existing HVAC system installed in 1985 failed to maintain a stable...; Areas of the National Park System AGENCY: National Park Service. ACTION: Final Rule. SUMMARY: The...
STS-112 final main engine is installed after welding/polishing process
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- The last engine is installed in orbiter Atlantis after a welding and polishing process was undertaken on flow liners where cracks were detected. All engines were removed for inspection of flow liners. Atlantis will next fly on mission STS-112, scheduled for launch no earlier than Oct. 2.
DOT National Transportation Integrated Search
1970-01-01
Thirty-nine test panels were installed on three interstate bridges to evaluate several combinations of curing and protective treatments for concrete. Panels were cured with white pigmented liquid membrane and white polyethylene, both with and without...
77 FR 37793 - Airworthiness Directives; the Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... proposed to require installing new structural members in and new tie rod(s) and attach fittings on the left.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for certain the Boeing... forward load. This AD requires installing new structural members, tie rod(s), and attach fittings on the...
Tracking the PhD Students' Daily Computer Use
ERIC Educational Resources Information Center
Sim, Kwong Nui; van der Meer, Jacques
2015-01-01
This study investigated PhD students' computer activities in their daily research practice. Software that tracks computer usage (Manic Time) was installed on the computers of nine PhD students, who were at their early, mid and final stage in doing their doctoral research in four different discipline areas (Commerce, Humanities, Health Sciences and…
Lessons from New Zealand: Leadership for Learning
ERIC Educational Resources Information Center
McPherson, Sarah; Borthwick, Arlene
2011-01-01
Last February, members of ISTE's Special Interest Group for Teacher Educators (SIGTE) traveled to New Zealand as part of a SIG-sponsored study tour. While there, the 13-member group visited seven schools and attended the Learning@School 2010 conference. In this third and final installment about their trip, they share observations about New…
Transport and installation of the Dark Energy Survey CCD imager
NASA Astrophysics Data System (ADS)
Derylo, Greg; Chi, Edward; Diehl, H. Thomas; Estrada, Juan; Flaugher, Brenna; Schultz, Ken
2012-09-01
The Dark Energy Survey CCD imager was constructed at the Fermi National Accelerator Laboratory and delivered to the Cerro Tololo Inter-American Observatory in Chile for installation onto the Blanco 4m telescope. Several efforts are described relating to preparation of the instrument for transport, development and testing of a shipping crate designed to minimize transportation loads transmitted to the camera, and inspection of the imager upon arrival at the observatory. Transportation loads were monitored and are described. For installation of the imager at the telescope prime focus, where it mates with its previously-installed optical corrector, specialized tooling was developed to safely lift, support, and position the vessel. The installation and removal processes were tested on the Telescope Simulator mockup at FNAL, thus minimizing technical and schedule risk for the work performed at CTIO. Final installation of the imager is scheduled for August 2012.
STS-112 final main engine is installed after welding/polishing process
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. - Workers get ready to install the last engine in orbiter Atlantis after a welding and polishing process was undertaken on flow liners where cracks were detected. All engines were removed for inspection of flow liners. Atlantis will next fly on mission STS-112, scheduled for launch no earlier than Oct. 2.
Analysis of energy conservation alternatives for standard Army building. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hittle, D.C.; O'Brien, R.E.; Percivall, G.S.
1983-03-01
This report describes energy conservation alternatives for five standard Army building designs. By surveying maps of major Army installations and using the Integrated Facilities System, the most popular designs were determined to be a two-company, rolling-pin-shaped barracks for enlisted personnel; a Type 64 barracks; a motor repair shop; a battalion headquarters and classroom building; and an enlisted personnel mess hall. The Building Loads Analysis and System Thermodynamics (BLAST) energy-analysis computer program was used to develop baseline energy consumption for each design based on the building descriptions and calibrated by comparison with the measured energy usage of similar buildings. Once themore » baseline was established, the BLAST program was used to study energy conservation alternatives (ECAs) which could be retrofit to the existing buildings. The ECAs included closing off air-handling units, adding storm windows, adding 2 in. (0.051 m) of exterior insulation to the walls, partially blocking the windows, adding roof insulation, putting up south overhangs, installing programmable thermostats, recovering heat from exhaust fans, installing temperature economizers, replacing lights, and installing partitions between areas of differing temperature.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-04-01
This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Point Lonely Distant Early Warning (DEW) Line radar installation. Twelve sites at the Point Lonely radar installation underwent remedial investigations (RIs) during the summer of 1993. The Vehicle Storage Area (SS14) was combined with the Inactive Landfill because the two sites were essentially co-located and were sampled during the RI as a single unit. Therefore, 11 sites are discussed in this risk assessment. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported inmore » the Point Lonely Remedial Investigation/Feasibility Study (RI/FS). The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessments. The primary chemicals of concern (COCs) at the 11 sites are diesel and gasoline from past spills and/or leaks, chlorinated solvents, and manganese. The 11 sites investigated and the types of samples collected at each site are presented.« less
Boeing CST-100 Starliner Base Heat Shield Installation
2018-03-15
On March 15, the base heat shield for Boeing’s CST-100 Starliner was freshly installed on the bottom of Spacecraft 1 in the High Bay of the Commercial Crew and Cargo Processing Facility at Kennedy Space Center. This is the spacecraft that will fly during the Pad Abort Test. The next step involves installation of the back shells and forward heat shield, and then the crew module will be mated to the service module for a fit check. Finally, the vehicle will head out to White Sands Missile Range in New Mexico for testing.
Medical Image Processing Server applied to Quality Control of Nuclear Medicine.
NASA Astrophysics Data System (ADS)
Vergara, C.; Graffigna, J. P.; Marino, E.; Omati, S.; Holleywell, P.
2016-04-01
This paper is framed within the area of medical image processing and aims to present the process of installation, configuration and implementation of a processing server of medical images (MIPS) in the Fundación Escuela de Medicina Nuclear located in Mendoza, Argentina (FUESMEN). It has been developed in the Gabinete de Tecnologia Médica (GA.TE.ME), Facultad de Ingeniería-Universidad Nacional de San Juan. MIPS is a software that using the DICOM standard, can receive medical imaging studies of different modalities or viewing stations, then it executes algorithms and finally returns the results to other devices. To achieve the objectives previously mentioned, preliminary tests were conducted in the laboratory. More over, tools were remotely installed in clinical enviroment. The appropiate protocols for setting up and using them in different services were established once defined those suitable algorithms. Finally, it’s important to focus on the implementation and training that is provided in FUESMEN, using nuclear medicine quality control processes. Results on implementation are exposed in this work.
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
Remedy and Recontamination Assessment Array
2017-03-01
of silica sand visual tracer at interface, (C) addition of thin sand layer, and (D) final result with treatment and overlying water added...Final result for thin clean sediment layer treatment after final installation of treatment and overlying water ... treatment sediments were held in the sediment cells or tubs with overlying surface water under cool conditions overnight prior to application of the
ERIC Educational Resources Information Center
Midlands Consortium.
The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…
Solar heating and cooling system design and development
NASA Technical Reports Server (NTRS)
1978-01-01
The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.
2010-05-21
ISS023-E-047827 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008906 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009312 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047841 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009074 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009283 (21 May 2010) --- NASA astronauts Michael Good (top center) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009246 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047842 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047855 (21 May 2010) --- NASA astronaut Garrett Reisman, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and NASA astronaut Michael Good (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009253 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008866 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman (partially obscured), both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009255 (21 May 2010) --- NASA astronauts Michael Good (bottom center) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047864 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008863 (21 May 2010) --- NASA astronauts Garrett Reisman (right) and Michael Good, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009298 (21 May 2010) --- NASA astronauts Michael Good (partially obscured at left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047845 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047833 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-008868 (21 May 2010) --- NASA astronauts Michael Good and Garrett Reisman (partially obscured), both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-049791 (21 May 2010) --- NASA astronauts Garrett Reisman (bottom) and Michael Good, both STS-132 mission specialists, participate in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Reisman and Good completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
S132-E-009242 (21 May 2010) --- NASA astronauts Michael Good (left) and Garrett Reisman, both STS-132 mission specialists, participate in the mission’s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and Reisman completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
2010-05-21
ISS023-E-047828 (21 May 2010) --- NASA astronaut Michael Good, STS-132 mission specialist, participates in the mission?s third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 46-minute spacewalk, Good and NASA astronaut Garrett Reisman (out of frame), mission specialist, completed the installation of the final two of the six new batteries for the B side of the port 6 solar array. In addition, the astronauts installed a backup ammonia jumper cable between the port 4 and 5 trusses of the station, transferred a Power and Data Grapple Fixture from the shuttle to the station, and reconfigured some tools.
Space shuttle food system study. Volume 1: System design report
NASA Technical Reports Server (NTRS)
1974-01-01
Data were assembled which define the optimum food system to support the space shuttle program, and which provide sufficient engineering data to support necessary requests for proposals towards final development and installment of the system. The study approach used is outlined, along with technical data and sketches for each functional area. Logistic support analysis, system assurance, and recommendations and conclusions based on the study results are also presented.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...
ERIC Educational Resources Information Center
MALEY, DONALD
THIS COURSE OUTLINE ON ELECTROMECHANICAL INSTALLATION AND REPAIR IS PART OF THE FINAL REPORT ON "CLUSTER CONCEPT" COURSES IN VOCATIONAL EDUCATION FOR SECONDARY EDUCATION (ED 010 301). EACH JOB ENTRY TASK WAS ANALYZED FOR HUMAN REQUIREMENTS (COMMUNICATION, MEASUREMENT, MATHEMATICS, SCIENCE, SKILLS, AND INFORMATION) NECESSARY TO…
STS-112 final main engine is installed after welding/polishing process
NASA Technical Reports Server (NTRS)
2002-01-01
KENNEDY SPACE CENTER, FLA. -- Workers on the engine lift get ready to install the last engine in orbiter Atlantis after a welding and polishing process was undertaken on flow liners where cracks were detected. All engines were removed for inspection of flow liners. Atlantis will next fly on mission STS-112, scheduled for launch no earlier than Oct. 2.
Composite polymeric film and method for its use in installing a very-thin polymeric film in a device
Duchane, D.V.; Barthell, B.L.
1982-04-26
A composite polymeric film and a method for its use in forming and installing a very thin (< 10 ..mu..m) polymeric film are disclosed. The composite film consists of a thin film layer and a backing layer. The backing layer is soluble in a solvent in which the thin film layer is not soluble. In accordance with the method, the composite film is installed in a device in the same position in which it is sought to finally emplace the thin film. The backing layer is then selectiely dissolved in the solvent to leave the insoluble thin film layer as an unbacked film. The method permits a very thin film to e successfully installed in devices where the fragility of the film would preclude handling and installation by conventional methods.
Composite polymeric film and method for its use in installing a very thin polymeric film in a device
Duchane, David V.; Barthell, Barry L.
1984-01-01
A composite polymeric film and a method for its use in forming and installing a very thin (<10 .mu.m) polymeric film are disclosed. The composite film consists of a thin film layer and a backing layer. The backing layer is soluble in a solvent in which the thin film layer is not soluble. In accordance with the method, the composite film is installed in a device in the same position in which it is sought to finally emplace the thin film. The backing layer is then selectively dissolved in the solvent to leave the insoluble thin film layer as an unbacked film. The method permits a very thin film to be successfully installed in devices where the fragility of the film would preclude handling and installation by conventional methods.
Performances and first science results with the VEGA/CHARA visible instrument
NASA Astrophysics Data System (ADS)
Mourard, D.; Tallon, M.; Bério, Ph.; Bonneau, D.; Chesneau, O.; Clausse, J. M.; Delaa, O.; Nardetto, N.; Perraut, K.; Spang, A.; Stee, Ph.; Tallon-Bosc, I.; McAlister, H.; ten Brummelaar, T.; Sturmann, J.; Sturmann, L.; Turner, N.; Farrington, C.; Goldfinger, P. J.
2010-07-01
This paper presents the current status of the VEGA (Visible spEctroGraph and polArimeter) instrument installed at the coherent focus of the CHARA Array, Mount Wilson CA. Installed in september 2007, the first science programs have started during summer 2008 and first science results are now published. Dedicated to high angular (0.3mas) and high spectral (R=30000) astrophysical studies, VEGA main objectives are the study of circumstellar environments of hot active stars or interactive binary systems and a large palette of new programs dedicated to fundamental stellar parameters. We will present successively the main characteristics of the instrument and its current performances in the CHARA environment, a short summary of two science programs and finally we will develop some studies showing the potential and difficulties of the 3 telescopes mode of VEGA/CHARA.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-25
At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-25
At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
STS-101: Crew Activity Report CAR/Flight Day 04 Highlights
NASA Technical Reports Server (NTRS)
2000-01-01
On this fourth day of the STS-101 Atlantis mission, the flight crew, Commander James D. Halsell Jr., Pilot Scott J. Horowitz, and Mission Specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev are seen performing final preparations for the scheduled space walk. Horowitz, Williams and Voss are seen in the mid-deck before the space walk. Horowitz and Weber are also seen in the flight deck, powering-up the robot-arm. During the space walk Voss is seen checking the American Cargo Crane-Orbital Replacement Unit Transfer Device. Voss and Williams are shown securing the American-built crane that was installed on the station last year. They are seen as they install the final parts (boom extension) of a Russian-built crane on the station. Voss and Williams are also shown as they replace a faulty antenna for one of the station's communications systems on the Unity Module, and install several handrails and a camera cable on the station's exterior.
Species of Concern (SOC) on Department of Defense Installations
2002-07-15
HODI, RUUR, SYAL , OEMLERIA CERASIFORMIS/DISPORUM HOOKERI, POLYSTICHUM, SMILACINA RACEMOSA, HYDROPHYLLUM TENUIPES, ADENOCAULON BICOLOR, TELLIMA...SPECIES: ACCI, SYAL ,RHAI,COCO. HERBS:POMU,POMU,DRAR,TROV,SMST,DIHO,VAHE,ACRU,RUUR,ADBI,LICO ,GATR,DSCH,TEGR.* SOC on DOD Installations FINAL – July...SITE. ORGANIC LAYER OVERSOIL. ASSOC. W/GASH, POMU, COCO, RHDI, ACTAEA RUBRA, SYAL .* OLD GROWTH PSME. UNDERSTORY OF CORYLUS CORNUTA, ACMA, ACCI. GROUND
NASA Astrophysics Data System (ADS)
Dunikov, D. O.; Borzenko, V. I.; Malyshenko, S. P.; Blinov, D. V.; Kazakov, A. N.
2013-03-01
The present state of technology for obtaining hydrogen by biological methods and for purifying it is reviewed from the viewpoint of its possible use in kilowatt-class power installations. Hybrid membranesorption biohydrogen purification methods combining membrane-based pretreatment and sorption-based final treatment, also with the use of metal hydrides, should be regarded as the most efficient ones.
1979-02-01
A 0 ’A099 7 1 3 tAU N A E R O S P A C E C O R P B E T H P A G E N Y F / 6 ~ ~ i DEVELOPMENT OF ENVIRONMENTAL. PROFILES FOR TESTING EQUIPMENT...IHIlia- ’ -Q IIIII.L25 MICROCOPY RESOLUTION’ TEST CHART C RMS-9-R-1 DEVELOPMENT OF ENVIRONMENTAL PROFILES FOR TESTING EQUIPMENT INSTALLED IN NAVAL... Development of Environmental Profiles for Testing ,’~ Final j quipment Installed in Naval Aircraft (Fixed Wing), e 7- e* 8 S. PERFORMING ORGANIZATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-01-08
This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIs) during the summer of 1993. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessments. The primary chemicals of concern (COCs) at the 14 sites are diesel and gasoline from past spills and/or leaks.
Sokaogon Chippewa Community Emission-Free and Treaty Resource Protection Clean Energy Initiative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quade, Ron
Final Report for DOE project DE-IE0000036 The Sokaogon Chippewa Community received a tribal clean energy initiative grant and installed a community wide solar system estimated to produce 606 kw of carbon free clean energy on seventeen (17) tribal buildings and three (3) residential homes significantly reducing the tribes’ energy bills over the life of the system, potentially saving the tribe up to $2.7 million in energy savings over a thirty (30) year time span. Fifteen (15) solar installations utilized aluminum roof-top mounting systems while two (2) installations utilized a ground mount aluminum racking system.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
The final brick was installed on the north side of the flame trench at Launch Complex 39B at NASA’s Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
Construction workers sign the final bricks after they were installed on the north side of the flame trench at Launch Complex 39B at NASA’s Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
A construction worker installs one of the final bricks on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
Preparations are underway to install the final brick on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
A construction worker installs the final brick on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
Construction workers install the final bricks on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
Progress on the Development of the Nb 3Sn 11T Dipole for the High Luminosity Upgrade of LHC
Savary, Frederic; Bajko, Marta; Bordini, Bernardo; ...
2017-02-08
The high-luminosity large hadron collider (LHC) project at CERN entered into the production phase in October 2015 after the completion of the design study phase. In the meantime, the development of the 11 T dipole needed for the upgrade of the collimation system of the machine made significant progress with very good performance of the first two-in-one magnet model of 2-m length made at CERN. The 11 T dipole, which is more powerful than the current main dipoles of LHC, can be made shorter with an equivalent integrated field. This will allow creating space for the installation of additional collimatorsmore » in specific locations of the dispersion suppressor regions. Following tests carried out during heavy ions runs of LHC in the end of 2015, and a more recent review of the project budget, the installation plan for the 11 T dipole was revised. Consequently, one 11 T dipole full assembly containing two 11 T dipoles of 5.5-m length will be installed on either side of interaction point 7. These two units shall be installed during the long shutdown 2 in years 2019-2020. After a brief reminder on the design features of the magnet, this paper describes the current status of the development activities, in particular the short model programme and the construction of the first full scale prototype at CERN. Finally, critical operations such as the reaction treatment and the coil impregnation are discussed, the quench performance tests results of the two-in-one model are reviewed and finally, the plan toward the production for the long shut down 2 is described.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-09-01
The final report is presented of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 5408 Williamsburg Road, Richmond, Virginia. The description of the system is given along with the final cost breakdown, expected performance data and expected payback time for the installed system is estimated to be approximately five (5) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryersmore » used for the laundry. The success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-07-01
The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 3400 Cumberland Road, Bluefield, West Virginia. The description of the system along with the final breakdown performance data and payback time are given. The payback time for the installed system will be approximately five (5) years instead of the 7.73 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers used for themore » laundry. The success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
NASA Technical Reports Server (NTRS)
Hodges, G. E.; Mcgehee, C. R.
1981-01-01
The final design and hardware fabrication was completed for an active control system capable of the required flutter suppression, compatible with and ready for installation in the NASA aeroelastic research wing number 1 (ARW-1) on Firebee II drone flight test vehicle. The flutter suppression system uses vertical acceleration at win buttock line 1.930 (76), with fuselage vertical and roll accelerations subtracted out, to drive wing outboard aileron control surfaces through appropriate symmetric and antisymmetric shaping filters. The goal of providing an increase of 20 percent above the unaugmented vehicle flutter velocity but below the maximum operating condition at Mach 0.98 is exceeded by the final flutter suppression system. Results indicate that the flutter suppression system mechanical and electronic components are ready for installation on the DAST ARW-1 wing and BQM-34E/F drone fuselage.
Remedial Investigation/Feasibility Study Fort Dix U.S. Army Installation Fort Dix, New Jersey
1994-01-01
METHOD: PARTICULATE FILTER; GRAVIMETRIC: (NIOSH VOL. Ill I 8583 , NUISANCE DUST (TOTAL)). »OSHA REVOKED THE FINAL RULE LIMITS OF JANUARY 19, 1989 IN...VJ ISO .- i-.i^ !...= : \\J~::— :!__’ii!-!lS . l~>.-- -.^ - ORAL-MCUSE LD50i 5SS0 MO/KG ORAL-rAf-iivifcii i LD50: 750 MG
Predesign study for a modern 4-bladed rotor for the NASA rotor systems research aircraft
NASA Technical Reports Server (NTRS)
Bishop, H. E.; Burkam, J. E.; Heminway, R. C.; Keys, C. N.; Smith, K. E.; Smith, J. H.; Staley, J. A.
1981-01-01
Trade-off study results and the rationale for the final selection of an existing modern four-bladed rotor system that can be adapted for installation on the Rotor Systems Research Aircraft (RSRA) are reported. The results of the detailed integration studies, parameter change studies, and instrumentation studies and the recommended plan for development and qualification of the rotor system is also given. Its parameter variants, integration on the RSRA, and support of ground and flight test programs are also discussed.
Pipeline bottoming cycle study. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The technical and economic feasibility of applying bottoming cycles to the prime movers that drive the compressors of natural gas pipelines was studied. These bottoming cycles convert some of the waste heat from the exhaust gas of the prime movers into shaft power and conserve gas. Three typical compressor station sites were selected, each on a different pipeline. Although the prime movers were different, they were similar enough in exhaust gas flow rate and temperature that a single bottoming cycle system could be designed, with some modifications, for all three sites. Preliminary design included selection of the bottoming cycle workingmore » fluid, optimization of the cycle, and design of the components, such as turbine, vapor generator and condensers. Installation drawings were made and hardware and installation costs were estimated. The results of the economic assessment of retrofitting bottoming cycle systems on the three selected sites indicated that profitability was strongly dependent upon the site-specific installation costs, how the energy was used and the yearly utilization of the apparatus. The study indicated that the bottoming cycles are a competitive investment alternative for certain applications for the pipeline industry. Bottoming cycles are technically feasible. It was concluded that proper design and operating practices would reduce the environmental and safety hazards to acceptable levels. The amount of gas that could be saved through the year 2000 by the adoption of bottoming cycles for two different supply projections was estimated as from 0.296 trillion ft/sup 3/ for a low supply projection to 0.734 trillion ft/sup 3/ for a high supply projection. The potential market for bottoming cycle equipment for the two supply projections varied from 170 to 500 units of varying size. Finally, a demonstration program plan was developed.« less
Wing Infrastructure and Development Outlook (WINDO) Final Environmental Assessment
2006-06-01
installation, and repair F Construct revetment , paint taxi lines, install runway shoulders, extend/repair flight line, maintain airfield pavement...RKMF990065 CONSTRUCT CHAPEL MEETING FAC C RKMF000041 CONSTRUCT REVETMENT LOLA SUPPORT FAC F RKMF010042 CONSTRUCT SHOULDERS RUNWAY 03L/21R F RKMF030054...100-foot transect intervals. Sampling utilized 100- foot intervals in blocks . Isolate artifacts were recorded on site forms until 1996. They were
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cole, P.R.
1996-03-01
A grant was made to install and pilot-test the Science, Engineering and Technology (SET) Career Library Corner at the New York Hall of Science. The SET Career Library Corner is located in a multi-media library setting where visitors can explore careers in a quiet, uninterrupted environment, in contrast to the original installation designed as a museum floor exhibit.
7 CFR Exhibit F to Subpart I of... - Site Option Loan to Technical Assistance Grantees
Code of Federal Regulations, 2012 CFR
2012-01-01
... SO funds advanced on the option, unless SO loan funds will still be needed to purchase other options...) The “kind of loan” block on the note will read “SO loan.” (2) The note will be modified to show that the only installment on the loan will be the final installment. (C) Loan is closed. The loan will be...
7 CFR Exhibit F to Subpart I of... - Site Option Loan to Technical Assistance Grantees
Code of Federal Regulations, 2014 CFR
2014-01-01
... SO funds advanced on the option, unless SO loan funds will still be needed to purchase other options...) The “kind of loan” block on the note will read “SO loan.” (2) The note will be modified to show that the only installment on the loan will be the final installment. (C) Loan is closed. The loan will be...
7 CFR Exhibit F to Subpart I of... - Site Option Loan to Technical Assistance Grantees
Code of Federal Regulations, 2013 CFR
2013-01-01
... SO funds advanced on the option, unless SO loan funds will still be needed to purchase other options...) The “kind of loan” block on the note will read “SO loan.” (2) The note will be modified to show that the only installment on the loan will be the final installment. (C) Loan is closed. The loan will be...
NASA Astrophysics Data System (ADS)
Li, Nana; Xie, Guohui
2018-06-01
Abstract—Global renewable energy have maintained a steady growth in recent years under the support of national policies and energy demand. Resource distribution, land supply, economy, voltage class and other relevant conditions affect the renewable energy distribution and development mode. Therefore, is necessary to analyze the spatial-temporal distribution and development modes for renewable energy, so as to provide reference and guidance for the renewable energy development around world. Firstly, the definitions and influence factors the renewable energy development mode are compared and summarized. Secondly, the renewable energy spatial-temporal distribution in Germany and Denmark are provided. Wind and solar power installations account for the largest proportion of all renewable energy in Germany and Denmark. Finally, renewable energy development modes are studied. The distributed photovoltaic generation accounts for more than 95%, and distributed wind power generation installations account for over 85% in Germany. Solar and wind resources are developed with distributed development mode, in which distributed wind power installation accounts for over 75%.
Digital control for the condensate system in a combined cycle power plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sanchez Parra, M.; Fuentes Gutierrez, J.E.; Castelo Cuevas, L.
1994-12-31
This paper presents the highlights by means of which development, installation and start up of the digital control system (DCS)for the condenser and hotwell (condensate system) were performed. This system belongs to the distributed control system installed by the Instituto de Investigaciones Electricas (IIE) at the Combined Cycle Power Plant in Gomez Palacio (GP), Durango, Mexico, during the February-March period, in 1993. The main steps for development of the condenser and hotwell control system include: process modeling, definition of control strategies, algorithms, design and software development, PC simulation tests, laboratory tests with an equipment similar to the one installed atmore » the GP Power Plant, installation, and finally, start up, which was a joint effort with the GP Power Plant engineering staff.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1982-09-01
This report is a summary of the Energy Engineering Analysis for the Milan Army Ammunition Plant (MAAP) in Milan, Tennessee. It includes the recommendations for the development of a Basewide Energy Plan consisting of energy conservation projects and other recommendations for reduction of the installation`s 1985 source energy consumption. Milan Army Ammunition Plant, containing 22,541 acres, is situated in both Gibson and Carroll Counties, Tennessee, and is approximately equally divided longitudinally into the two counties. The Milan area experiences typically short mild winters and long warm summers. With the exception of a few modernized facilities, the overwhelming majority of buildingsmore » at MAAP were constructed for World War II ammunition production.« less
Final Technical Report for EE0006091: H2Pump Hydrogen Recycling System Demonstration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staudt, Rhonda
The objective of this project is to demonstrate the product readiness and to quantify the benefits and customer value proposition of H2Pump’s Hydrogen Recycling System (HRS-100™) by installing and analyzing the operation of multiple prototype 100-kg per day systems in real world customer locations. The data gathered will be used to measure reliability, demonstrate the value proposition to customers, and validate our business model. H2Pump will install, track and report multiple field demonstration systems in industrial heat treating and semi-conductor applications. The customer demonstrations will be used to develop case studies and showcase the benefits of the technology to drivemore » market adoption.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baxter, Van D.; Munk, Jeffrey D.; Gehl, Anthony C.
The field study is planned to continue through the 2016 cooling season with the draft final project report due by September 30, 2016. This report provides a description of both installations and preliminary 2015 cooling and fall season performance results for the Knoxville site. For the August 18 through December 14 period, the Knoxville site GS-IHP provided 53.6% total source energy savings compared to a baseline electric RTU/heat pump and electric WH. Peak demand savings ranged from 33% to 59% per month. Energy cost savings of 53.1% have been achieved to date with more than half of that coming frommore » reduced demand charges. Data on installation and maintenance costs are being collected and will be combined with total test period energy savings data for a payback analysis to be included in the project final report. The GS-IHP also saved a significant amount of carbon emissions. The total emission savings for the Knoxville site for the August-December 2015 period were ~0.8 metric tons. If trading for carbon credits ever becomes a reality, additional cost savings would be realized.« less
The Wolf at the Door: Competing Land Use Values on Military Installations
1996-04-01
The Gray Wolf ............. ................ 88 a. Return to Yellowstone ...... .......... 90 1. Final EIS ......... ............. 91 2. Wolves ...western North and South Dakota. 233 "A final devastating blow fell when officials in Yellowstone decided to exterminate the park wolves --they succeeded... Wolves into Yellowstone National Park and central Idaho.32° FWS Regional Director Ralph Morgenweck issued the Final EIS (FEIS) on April 14, 1994.321 The
Final Report. Solar Assist for Administration Building and Community Gym/Pool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Synder, Randy; Bresette, Joseph
2015-06-23
Tonto Apache Tribe applied to the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2013 to implement a solar project to reduce energy use in two tribal buildings. Total estimated project cost was $804,140, with the Department and Tribe each providing 50% of the project costs. Photovoltaic systems totaling 75 kW on the Administration Building and 192 kW on the Gymnasium were installed. We used roof tops and installed canopies in adjacent parking areas for mounting the systems. The installed systems were designed to offset 65% of the facilities electric load.
Final Flame Trench Brick Installation at Launch Pad 39B
2017-05-09
A view of the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The final brick was installed in the flame trench, completing about a year's worth of work to upgrade the walls to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.
DOT National Transportation Integrated Search
2006-11-01
The US 93 reconstruction project on the Flathead Indian Reservation in northwest Montana represents one of the most extensive wildlife-sensitive highway design efforts to occur in the continental United States. The reconstruction will include install...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
...Pursuant to the Council on Environmental Quality Regulations (40 CFR part 1500-08) implementing procedural provisions of the National Environmental Policy Act (NEPA), the Department of Labor, Office of the Secretary (OSEC), in accordance with 29 CFR 11.11(d), gives final notice of the proposed construction of a small wind turbine at the Pine Ridge Job Corps Center, and that this project will not have a significant adverse impact on the environment. In accordance with 29 CFR 11.11(d) and 40 CFR 1501.4(e)(2), a preliminary FONSI for the project was published in the April 5, 2010 Federal Register (75 FR 17161). No comments were received regarding the preliminary FONSI. OSEC has reviewed the conclusion of the environmental assessment (EA), and agrees with the finding of no significant impact. This notice serves as the Final Finding of No Significant Impact (FONSI) for Small Wind Turbine Installation at the Pine Ridge Job Corps Center located at 15710 Highway 385, Chadron, NE 69337. The preliminary FONSI and the EA are adopted in final with no change.
NASA Astrophysics Data System (ADS)
Shtripling, L. O.; Kholkin, E. G.
2018-01-01
The article presents the procedure for determining the basic geometrical setting parameters for the oil-contaminated soils decontamination with reagent encapsulation method. An installation is considered for the operational elimination of the emergency consequences accompanied with oil spills, and the installation is adapted to winter conditions. In the installations exothermic process thermal energy of chemical neutralization of oil-contaminated soils released during the decontamination is used to thaw frozen subsequent portions of oil-contaminated soil. Installation for oil-contaminated soil decontamination as compared with other units has an important advantage, and it is, if necessary (e.g., in winter) in using the heat energy released at each decontamination process stage of oil-contaminated soil, in normal conditions the heat is dispersed into the environment. In addition, the short-term forced carbon dioxide delivery at the decontamination process final stage to a high concentration directly into the installation allows replacing the long process of microcapsule shells formation and hardening that occur in natural conditions in the open air.
Final Report- Local Energy Matters: Solar Development in Duluth, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slick, Jodi Lyn
The Local Energy Matters project advanced solar deployment in the City of Duluth, MN- a cold-climate community of 86,000. At the beginning of the project, Duluth had 254.57 kW installed solar capacity with an average cost of 5.04 USD/watt installed in 2014. The project worked with cross-sector stakeholders to benchmark the current market, implement best practices for solar deployment and soft cost reduction, develop pilot deployment programs in residential rooftop, community solar, and commercial/industrial sectors, work with the City of Duluth to determine appropriate sites for utility scale developments, and demonstrate solar pus storage. Over the three years of themore » project, Duluth’s installed residential and commercial solar capacity grew by 344% to 875.9 kW with an additional 702 kW solar garden capacity subscribed by Duluth residents, businesses, and institutions. Installation costs dropped 48% over this timeframe to 4.08 USD/watt installed (exclusive of solar garden construction). This report documents the process used to identify levers for increased solar installation and cost reductions in a nascent cold-climate solar market.« less
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less
Solar heating system installed at Jackson, Tennessee. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-10-01
The solar energy heating system installed at the Coca-Cola Bottling Works in Jackson, Tennessee is described. The system consists of 9480 square feet of Owens-Illinois evacuated tubular solar collectors with attached specular cylindrical reflectors and will provide space heating for the 70,000 square foot production building in the winter, and hot water for the bottle washing equipment the remainder of the year. Component specifications and engineering drawings are included. (WHK)
Airborne-Fiber Optics Manufacturing Technology, Aircraft Installation Processes.
1980-08-19
but the impact is minor. With simpler equipment and techniques there may be a J’ 1 -, long- term savings potential. Overall costs and benefits of...4/72 1 * lh427 ,. . . ... .. - - . .. . 4.0 ASSEMBLY OF FIBER OPTIC CABLES AND HARNESSES 4.1 CABLE IDENTIFICATION (Marking) 4.1.1 Physically identify...FIBER OPTICS MANUFACTURING TECHNOLOGY Aircraft Installation Processes G Kosmos ~ ~ 19 August 1980 I 2 Final Report: May 1978 - June 1980 . 1 Prepared for
Maritime Analytics Prototype: Final Development Report
2014-04-01
access management platform OpenAM , support for multiple instances of the same type of widget and support for installation specific configuration files to...et de la gestion de l’accès OpenAM , le support pour plusieurs instances du même type de widget et le support des fichiers d’installation de...open source authentication and access management platform OpenAM , support for multiple instances of the same type of widget and support for
2017-01-01
the property, put final cleanup remedies in place before the property is transferred. However, under some circumstances the services may conduct an...early transfer before cleanup has been completed. When remedies are in place for addressing the contamination of a former installation or the...cleanup at BRAC installations will significantly increase due to the high cost of remediating emerging contaminants, primarily perfluorooctane
DOE Office of Scientific and Technical Information (OSTI.GOV)
Im, Piljae; Munk, Jeffrey D; Gehl, Anthony C
2015-06-01
A research project “Evaluation of Variable Refrigerant Flow (VRF) Systems Performance and the Enhanced Control Algorithm on Oak Ridge National Laboratory’s (ORNL’s) Flexible Research Platform” was performed to (1) install and validate the performance of Samsung VRF systems compared with the baseline rooftop unit (RTU) variable-air-volume (VAV) system and (2) evaluate the enhanced control algorithm for the VRF system on the two-story flexible research platform (FRP) in Oak Ridge, Tennessee. Based on the VRF system designed by Samsung and ORNL, the system was installed from February 18 through April 15, 2014. The final commissioning and system optimization were completed onmore » June 2, 2014, and the initial test for system operation was started the following day, June 3, 2014. In addition, the enhanced control algorithm was implemented and updated on June 18. After a series of additional commissioning actions, the energy performance data from the RTU and the VRF system were monitored from July 7, 2014, through February 28, 2015. Data monitoring and analysis were performed for the cooling season and heating season separately, and the calibrated simulation model was developed and used to estimate the energy performance of the RTU and VRF systems. This final report includes discussion of the design and installation of the VRF system, the data monitoring and analysis plan, the cooling season and heating season data analysis, and the building energy modeling study« less
2002-07-12
Technicians at General Atomics Aeronautical Systems, Inc., (GA-ASI) facility at Adelanto, Calif., carefully install a turboprop engine to the rear fuselage of NASA's Altair aircraft during final assembly operations.
Equipment and water treatment considerations for the provision of quotidian home hemodialysis.
Mehrabian, Shawn; Morgan, Dale; Schlaeper, Christian; Kortas, Claude; Lindsay, Robert M
2003-07-01
Whereas clinical benefits of more frequent hemodialysis (HD) treatment are well documented, little information is available about technical aspects involved in setting up a patient's home for home HD. Technical considerations include the home infrastructure, as well as required plumbing modifications and electrical hook-ups. Twenty home HD installations were supported for the London Daily/Nocturnal Hemodialysis Study. The Fresenius 2008H (Fresenius Medical Care, North America, Lexington, MA) HD machine was used for all home HD installations in conjunction with a Service Deionization Tank (SDI) water treatment system composed of pretreatment, purification, and posttreatment components. To ensure that SDI systems provided high-quality water and dialysate, standard bacteriological testing was performed throughout the study, and patient serum C-reactive protein (CRP) levels were tracked as an indicator of nonspecific inflammation. The annual number of hours of work required for each home HD installation and service/maintenance was approximately 75 and 58 hours, respectively. Water quality proved high because there were only 4 occurrences of failed endotoxin and bacterial tests; all were subsequently retested and provided satisfactory results. Serum CRP levels showed no significant difference comparing home HD patients with conventional in-center HD control patients. Although support of 20 home HD installations was economically feasible within the constraints of the London Health Sciences Centre Department of Biomedical Engineering, resources were strained by the final year of the study. This suggests that any sustained growth beyond the current study design may require a review of staffing, resources, and model of service delivery needs.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... according to the design. The third- subsea function and pressure tests party verification must include...; Requires new casing and cementing integrity tests; Establishes new requirements for subsea secondary BOP... that, for the final casing string (or liner if it is the final string), an operator must install one...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-22
... include: demolition of approximately 6,435 feet of Airport Road; construction of approximately 6,405 feet of relocated Airport Road; installation of ILS components on the north end of Runway 20; construction of access roads and equipment shelter buildings; construction of the parallel taxiway/ramp expansion...
A lateral approach for sinus elevation using PRGF technology.
Anitua, Eduardo; Prado, Roberto; Orive, Gorka
2009-10-01
A lateral approach for sinus elevation using plasma rich in growth factors (PRGF) technology is described. The long-term survival of dental implants installed following a two-stage procedure after sinus elevation using this procedure is reported, using implant loss as the outcome variable. A retrospective cohort study design was used. Eighteen patients received 43 implants (BTI implants, Biotechnology Institute, Vitoria, Spain) with sinus floor elevation. All patients presented a residual bone height of class D (1-3 mm). Implants were installed using a low-speed drilling procedure (50 rpm) without irrigation. Finally, the histological and histomorphometric evaluation of eight samples from PRGF grafted sinus involved in the study was carried out 5-6 months posttreatment. The overall survival rate of dental implants was 100%. The mean follow-up period for all implants was 33 +/- 7 months ranging from 24 to 44 months. In addition, the histomorphometrical evaluation of the samples evidenced a 25.24 +/- 4.62% of vital newly formed bone, 50.31 +/- 15.56% of soft connective tissue, and the remaining 24.46 +/- 12.79% of bovine anorganic bone. Based on these results, this new approach for sinus elevation and implant installation using PRGF technology can be considered safe, simple, effective, and predictable.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-12-01
The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 4725 W. Military Highway, Chesapeake, Virginia, is presented. The description of the system along with the final breakdown performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers usedmore » for the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-11-01
The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 13317 Gordon Boulevard, Woodbridge, Virginia is given. The description of the system along with the final breakdown, performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 7.2 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers used formore » the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
EMMA, a Recoil Mass Spectrometer for TRIUMF's ISAC-II Facility
NASA Astrophysics Data System (ADS)
Davids, Barry; EMMA Collaboration
2016-09-01
EMMA is a recoil mass spectrometer for TRIUMF's ISAC-II facility in the final stages of installation and commissioning. In this talk I will briefly review the spectrometer's design capabilities, describe recent progress in its installation and commissioning, and discuss plans for its initial experimental program. This work was supported by the Natural Sciences and Engineering Council of Canada. TRIUMF receives federal funds through a contribution agreement with the National Research Council of Canada.
2006-03-01
2003 Air Emission Inventory, July 2004. o The generators are assumed to be diesel-fired and have a horsepower rating of less than 600 hp. o...In July 2003, the 460th LRS purchased and installed an automated movable storage system for mobility bag storage. This system eliminates wasted aisle...Installation Restoration Program Draft Final Engineering Evaluation/Cost Analysis IRP Site 4. July . • URS Corporation (URS). 2003a. Buckley Air Force
DoD Can Save Millions by Using Energy Efficient Centralized Aircraft Support Systems.
1982-05-07
recommends that the Secretary of the Air Force: -- Reevaluate the decision not to install centralized systems at tactical bases. If the systems can be...discontinue using the aircraft’s onboard auxillary power units. These units consume tremendous amounts of jet fuel in providing cabin air-conditioning...requirements. Each command has been asked to analyze its bases to determine if centralized systems should be installed. Although a final decision has not
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A Problem Confirmation Study was performed at three sites on Mather AFB identified in the Phase I investigation as requiring further study (the Air command and warning Area, the 7100 Area, the West Ditch) and the Northeast Perimeter. The field investigation was conducted from February 1984 to June 1985 and included installation of 11 monitor wells, collection of groundwater samples from the monitor wells and 15 base production wells, and collection of sediment samples from two locations on the West Ditch. Analytes included oil and grease, TOC, volatile organic compounds (VOA), as well as dimethylnitrosamine, phenols, pesticides, and dissolved metalsmore » at some specific sites. Based on the hydrogeologic complexity of the physical setting and the findings of the sampling and analytical work, follow-on investigations were recommended at all three sites.« less
NASA Technical Reports Server (NTRS)
Price, Richard N.
2007-01-01
This paper intends to describe the lessons learned while specifying validating and installing a bit sync to replace the 30 year old Aydin Model 335a PCM bit sync used in the Space Shuttle Launch Control Center. The engineer had to analyze the original requirements and specifications and then create new requirements documentation that more correctly described our needs. One issue to consider was the removal of unnecessary requirements such as various data formats when only one format is used. The conversion to a system that no longer has an assortment of analog rotary switches required retraining of the operators. Finally, post-procurement corrections for undisclosed user requirements and missed design requirements required close contact with a manufacturer who was willing to accommodate the changes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
2004-02-04
KENNEDY SPACE CENTER, FLA. - Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Oliu oversees the image lab that is using an advanced SGI® TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASA’s Marshall Space Flight Center in Alabama in reviewing the tape.
2004-02-04
KENNEDY SPACE CENTER, FLA. - Reporters are eager to hear from Armando Oliu about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Oliu, Final Inspection Team lead for the Shuttle program, oversees the lab that is using an advanced SGI® TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASA’s Marshall Space Flight Center in Alabama in reviewing the tape.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jack Q. Richardson
2012-06-28
Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less
NASA Technical Reports Server (NTRS)
Thomas, Russell H.; Burley, Casey L.; Lopes, Leonard V.; Bahr, Christopher J.; Gern, Frank H.; VanZante, Dale E.
2014-01-01
An aircraft system noise assessment was conducted for a hybrid wing body freighter aircraft concept configured with three open rotor engines. The primary objective of the study was to determine the aircraft system level noise given the significant impact of installation effects including shielding the open rotor noise by the airframe. The aircraft was designed to carry a payload of 100,000 lbs on a 6,500 nautical mile mission. An experimental database was used to establish the propulsion airframe aeroacoustic installation effects including those from shielding by the airframe planform, interactions with the control surfaces, and additional noise reduction technologies. A second objective of the study applied the impacts of projected low noise airframe technology and a projection of advanced low noise rotors appropriate for the NASA N+2 2025 timeframe. With the projection of low noise rotors and installation effects, the aircraft system level was 26.0 EPNLdB below Stage 4 level with the engine installed at 1.0 rotor diameters upstream of the trailing edge. Moving the engine to 1.5 rotor diameters brought the system level noise to 30.8 EPNLdB below Stage 4. At these locations on the airframe, the integrated level of installation effects including shielding can be as much as 20 EPNLdB cumulative in addition to lower engine source noise from advanced low noise rotors. And finally, an additional set of technology effects were identified and the potential impact at the system level was estimated for noise only without assessing the impact on aircraft performance. If these additional effects were to be included it is estimated that the potential aircraft system noise could reach as low as 38.0 EPNLdB cumulative below Stage 4.
Hecker, R M
2017-02-01
When drinking water contaminations occur in installations belonging to a semiautonomous condominium community ( Wohnungseigentumsgemeinschaft ) and the water installation's final paths being owned by the various condominium owners, the German legal definition of the party responsible has a broad reach. Therefore, authorities should address the condominium community, the condominium owners and the community administrator ( WEG-Verwalter ). © Georg Thieme Verlag KG Stuttgart · New York.
Future landfill emissions and the effect of final cover installation--a case study.
Laner, David; Fellner, Johann; Brunner, Paul H
2011-07-01
Municipal solid waste (MSW) landfills are potential long-term sources of emissions. Hence, they need to be managed after closure until they do not pose a threat to humans or the environment. The case study on the Breitenau MSW landfill was performed to evaluate future emission levels for this site and to illustrate the effect of final cover installation with respect to long-term environmental risks. The methodology was based on a comprehensive assessment of the state of the landfill and included analysis of monitoring data, investigations of landfilled waste, and an evaluation of containment systems. A model to estimate future emission levels was established and site-specific predictions of leachate emissions were presented based on scenario analysis. The results are used to evaluate the future pollution potential of the landfill and to compare different aftercare concepts in view of long-term emissions. As some leachable substances became available for water flow during cover construction due to a change in the water flow pattern of the waste, a substantial increase in leachate concentrations could be observed at the site (e.g. concentrations of chloride increased from 200 to 800 mg/l and of ammonia-nitrogen from 140 to about 500 mg/l). A period of intensive flushing before the final cover installation could have reduced the amount of leachable substances within the landfill body and rapidly decreased the leachate concentrations to 11 mg Cl/l and 79 mg NH(4)-N/l within 50 years. Contrarily, the minimization of water infiltration is associated with leachate concentrations in a high range for centuries (above 400 mg Cl/l and 200 mg NH(4)-N/l) with low concomitant annual emission loads (below 12 kg/year of Cl or 9 kg/year of NH(4)-N, respectively). However, an expected gradual decrease of barrier efficiency over time would be associated with higher emission loads of 50 kg of chloride and 30 kg of ammonia-nitrogen at the maximum, but a faster decrease of leachate concentration levels. Copyright © 2011 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1977-06-01
The mixed-strategy analysis was a tradeoff analysis between energy-conservation methods and an alternative energy source (solar) considering technical and economic benefits. The objective of the analysis was to develop guidelines for: reducing energy requirements; reducing conventional fuel use; and identifying economic alternatives for building owners. The analysis was done with a solar system in place. This makes the study unique in that it is determining the interaction of energy conservation with a solar system. The study, therefore, established guidelines as to how to minimize capital investment while reducing the conventional fuel consumption through either a larger solar system or anmore » energy-conserving technique. To focus the scope of energy-conservation techniques and alternative energy sources considered, five building types (house, apartment buildings, commercial buildings, schools, and office buildings) were selected. Finally, the lists of energy-conservation techniques and alternative energy sources were reduced to lists of manageable size by using technical attributes to select the best candidates for further study. The resultant energy-conservation techniques were described in detail and installed costs determined. The alternative energy source reduced to solar. Building construction characteristics were defined for each building for each of four geographic regions of the country. A mixed strategy consisting of an energy-conservation technique and solar heating/hot water/cooling system was analyzed, using computer simulation to determine the interaction between energy conservation and the solar system. Finally, using FEA fuel-price scenarios and installed costs for the solar system and energy conservation techniques, an economic analysis was performed to determine the cost effectiveness of the combination. (MCW)« less
Determination of ac conductor and pipe loss in pipe-type cable systems. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silver, D.A.; Seman, G.W.
1982-02-01
The results are presented of investigations into the determination of the ac/dc resistance ratios of high and extra high voltage pipe-type cables with conventional and large size segmental conductors in carbon steel, stainless steel and aluminum pipes in three cable per pipe and single cable per pipe configurations. The measurements included 115 through 765 kV cables with copper, enamel coated copper, and aluminum conductors in sizes of 2000 kcmil (1015 mm/sup 2/), 3250 kcmil (1650 mm/sup 2/), and 3500 kcmil (1776 mm/sup 2/). Calculations using presently available techniques were employed to provide correlation between measured and calculated values in bothmore » magnetic and non-magnetic pipes. In addition, a number of new techniques in conductor construction, pipe material and pipe liners and cable wraps were investigated as means of decreasing the ac/dc resistance ratios of pipe-type cables. Finally, the various systems studied were compared on the basis of system MVA rating and by evaluation of installed and overall operating costs as compared to conventional three cable per pipe systems installed in carbon steel pipes.« less
Examples of Mesh and NURBS modelling for in vivo lung counting studies.
Farah, Jad; Broggio, David; Franck, Didier
2011-03-01
Realistic calibration coefficients for in vivo counting installations are assessed using voxel phantoms and Monte Carlo calculations. However, voxel phantoms construction is time consuming and their flexibility extremely limited. This paper involves Mesh and non-uniform rational B-splines graphical formats, of greater flexibility, to optimise the calibration of in vivo counting installations. Two studies validating the use of such phantoms and involving geometry deformation and modelling were carried out to study the morphologic effect on lung counting efficiency. The created 3D models fitted with the reference ones, with volumetric differences of <5 %. Moreover, it was found that counting efficiency varies with the inverse of lungs' volume and that the latter primes when compared with chest wall thickness. Finally, a series of different thoracic female phantoms of various cup sizes, chest girths and internal organs' volumes were created starting from the International Commission on Radiological Protection (ICRP) adult female reference computational phantom to give correction factors for the lung monitoring of female workers.
Economics of PPP-insulated pipe-type cable: Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ernst, A.
1987-10-01
This study has been designed to establish the economic range of application and the potential cost advantage of PPP-insulated pipe-type cable compared with presently utilized paper-insulated designs. The study is in two parts. In the first part the electrical and thermal characteristics of a range of cable sizes are tabulated. This data can be utilized for planning and economic comparison purposes. In the second part 12 transmission load scenarios are studied to determine the relative cost of various designs considering materials, installation and the losses over a wide range of assumptions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.
This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components onmore » a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.« less
ALS superbend magnet performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marks, Steve; Zbasnik, John; Byrne, Warren
2001-12-10
The Lawrence Berkeley National Laboratory has been engaged in the design, construction and testing of four superconducting dipoles (Superbends) that are installed in three arcs of the Advanced Light Source (ALS), with the fourth magnet as a spare. This represents a major upgrade to the ALS providing an enhanced flux and brightness at photon energies above 10 keV. In preparation for installation, an extensive set of tests and measurements have been conducted to characterize the magnetic and cryogenic performance of the Superbends and to fiducialize them for accurate placement in the ALS storage ring. The magnets are currently installed, andmore » the storage ring is undergoing final commissioning. This paper will present the results of magnetic and cryogenic testing.« less
North Carolina pedestrian crossing guidance : final report.
DOT National Transportation Integrated Search
2015-07-20
This research report is geared at providing guidance to NCDOT for when to consider marking crosswalks at : uncontrolled approaches for pedestrians, installing pedestrian signal heads at existing signalized intersections, or : providing supplemental t...
Watertight pipe joint survey : final report
DOT National Transportation Integrated Search
2000-04-01
Oregon Department of Transportation (ODOT) has been specifying watertight pipes for storm sewer and some culvert pipe installations. The ODOT designer is responsible for specifying the watertight requirement, but there is no currently accepted standa...
Large Synoptic Survey Telescope mount final design
NASA Astrophysics Data System (ADS)
Callahan, Shawn; Gressler, William; Thomas, Sandrine J.; Gessner, Chuck; Warner, Mike; Barr, Jeff; Lotz, Paul J.; Schumacher, German; Wiecha, Oliver; Angeli, George; Andrew, John; Claver, Chuck; Schoening, Bill; Sebag, Jacques; Krabbendam, Victor; Neill, Doug; Hileman, Ed; Muller, Gary; Araujo, Constanza; Orden Martinez, Alfredo; Perezagua Aguado, Manuel; García-Marchena, Luis; Ruiz de Argandoña, Ismael; Romero, Francisco M.; Rodríguez, Ricardo; Carlos González, José; Venturini, Marco
2016-08-01
This paper describes the status and details of the large synoptic survey telescope1,2,3 mount assembly (TMA). On June 9th, 2014 the contract for the design and build of the large synoptic survey telescope mount assembly (TMA) was awarded to GHESA Ingeniería y Tecnología, S.A. and Asturfeito, S.A. The design successfully passed the preliminary design review on October 2, 2015 and the final design review January 29, 2016. This paper describes the detailed design by subsystem, analytical model results, preparations being taken to complete the fabrication, and the transportation and installation plans to install the mount on Cerro Pachón in Chile. This large project is the culmination of work by many people and the authors would like to thank everyone that has contributed to the success of this project.
Black Creek Hydro Project high-line cable penstock installation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fonnesbeck, K.C.; Ellicock, R.
1995-12-31
The Black Creek Hydro Project is a remote, high head, run-of-river, small hydro project located near Seattle, Washington. The comparatively small size of this project was not indicative of the difficulties and challenges presented to the design engineers and construction contractors involved in it`s completion. The most difficult of these challenges was the design and installation of a buried penstock on very steep and heavily forested terrain. This paper will concentrate on construction of the Black Creek penstock, and specifically, that portion of the penstock which required innovative application of a suspended {open_quotes}high-line{close_quotes} cable operation as used is commonly formore » logging of steep slopes. For this project, the cable installation and yarder equipment were utilized for a variety of purposes including, clearing and logging of the slope, to secure heavy equipment and machinery required to excavate the penstock trench, transport and placement of the individual pipe joints and finally to encase the pipe with lean concrete. The successful application of this approach contributed greatly to the timely completion of the project. This paper will offer background information on the selection and design of the cable Installation as well as highlights of the solutions that were developed to overcome the design and construction problems encountered. Finally, cost data will be offered to those who may be faced with similar undertakings caused by the steep and difficult sites attracting more attention in present days.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCammon, T.L.; Dilks, C.L.; Savoie, M.J.
1995-09-01
Relatively poor performance at the aging central heating plants (OH Ps) and planned changes in steam demand at Aberdeen Proving Ground (APG) Edgewood Area, Aberdeen, MD warranted an investigation of alternatives for providing thermal energy to the installation. This study: (1) evaluated the condition of the APG CHPs and heat distribution system, (2) identified thermal energy supply problems and cost-effective technologies to maintain APG`s capability to produce and distribute the needed thermal energy, and (3) recommended renovation and modernization projects for the system. Heating loads were analyzed using computer simulations, and life cycle costs were developed for each alternative. Recommendedmore » alternatives included upgrading the existing system, installing new boilers, consolidating the central heating plants, and introducing the use of absorption chilling.« less
Project SAGE: solar assisted gas energy. Final report and executive summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less
ERIC Educational Resources Information Center
Anderson, Herbert L.
1974-01-01
The final installment of the author's recollections of his work with physicists Enrico Fermi, Leo Szilard and others in developing the first controlled nuclear chain reaction and in preparing the test explosion of the first atomic bomb. (GS)
Evaluation of experimental rumble strips : 1982-1986 : final report.
DOT National Transportation Integrated Search
1987-07-01
This report was prepared to provide the results of evaluations conducted upon twenty-six roadways where rumble strips were installed experimentally in Louisiana between August 1982 and September 1984. Situated randomly throughout Louisiana, construct...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-25
... demolition activities, substantial excavation and grading, installation of a geohazard soil stabilization... human environment. The No-Action Alternative was analyzed and assumes the newly proposed actions would...
40 CFR 60.22 - Publication of guideline documents, emission guidelines, and final compliance times.
Code of Federal Regulations, 2010 CFR
2010-07-01
... for the design, installation, and startup of identified control systems. (5) An emission guideline... different emission guidelines or compliance times or both for different sizes, types, and classes of...
Evaluation of reference markers : final report.
DOT National Transportation Integrated Search
2001-06-01
The objective of this research evaluation was to evaluate the reference markers which were installed on sections of interstates and freeways in the Cincinnati-Northern Kentucky area, the Lexington-Fayette Urban County area, the Louisville-southern In...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, J.
1994-07-01
This is one of a series of reports that document the steps taken to plan and install a utility-scale windfarm and follow its energy production performance. The reports are intended to help utility planners and others better understand the issues involved in installing and operating a windfarm. This report describes the Zond Victory Garden Phase IV (VGIV) windfarm in the Tehachapi mountain region, 100 miles north of Los Angeles. The Victory Garden series of windfarms were planned and installed and are operated by Zond Systems, Inc. of Tehachapi, California. The VGIV installation, which became operational in stages from January throughmore » June 1990, consists of 98 Vestas V27--225 wind turbines. The total rated capacity is 22 MW with a projected annual average net energy production of 54.3 million kWh/yr, equivalent to an annual capacity factor of 0.28. This energy projection, based on extensive wind resource measurements and an average wind turbine availability of 97%, includes the effects of a number of operational loss factors. The report includes descriptions of the windfarm layout, the wind turbine component, and the electrical layout. Particular attention is paid to one of the most important issues in implementing a windfarm, namely, the wind resource assessment and its use in projecting and updating the expected annual-average energy production of the facility. Also included are details of the planning, construction, and commissioning of the windfarm along with a description of the operations and maintenance procedures employed.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Geet, Otto D.; Fu, Ran; Horowitz, Kelsey A.
NREL studied a new type of photovoltaic (PV) module configuration wherein multiple narrow, tilted slats are mounted in a single frame. Each slat of the PV slat module contains a single row of cells and is made using ordinary crystalline silicon PV module materials and processes, including a glass front sheet and weatherproof polymer encapsulation. Compared to a conventional ballasted system, a system using slat modules offer higher energy production and lower weight at lower LCOE. The key benefits of slat modules are reduced wind loading, improved capacity factor and reduced installation cost. First, the individual slats allow air tomore » flow through, which reduce wind loading. Using PV performance modeling software, we compared the performance of an optimized installation of slats modules to a typical installation of conventional modules in a ballasted rack mounting system. Based on the results of the performance modeling two different row tilt and spacing were tested in a wind tunnel. Scaled models of the PV Slat modules were wind tunnel tested to quantify the wind loading of a slat module system on a commercial rooftop, comparing the results to conventional ballasted rack mounted PV modules. Some commercial roofs do not have sufficient reserve dead load capacity to accommodate a ballasted system. A reduced ballast system design could make PV system installation on these roofs feasible for the first time without accepting the disadvantages of penetrating mounts. Finally, technoeconomic analysis was conducted to enable an economic comparison between a conventional commercial rooftop system and a reduced-ballast slat module installation.« less
Upcoming approved ALMA studies and new projects
NASA Astrophysics Data System (ADS)
Wootten, Al
2016-09-01
Science results from the Atacama Large Millimeter/submillimeter Array (ALMA) have been transforming astronomy, and more than 400 papers have been published on a wide range of topics to date, from nearly one thousand delivered datasets. Installation and commissioning of two of the final three of the ten receiver bands defined in the specifications and requirements are in progress. Final installation of its ten bands empower ALMA to operate at wavelengths from 7mm to 0.3mm across a decade of frequency access as enabled by broad bandwidth ALMA receivers, powerful correlators and spectacular site. The ALMA specifications, contracts and construction began in 2003. The impetus to development of cutting edge technology spurred by ALMA construction has resulted in enormous advances since that time. Having invested ˜$1.3B USD to realize the largest historical advance in groundbased astronomy, it is vital to maintain and expand ALMA capabilities. The ALMA Development Program provides resources for that; the science community will define the scientific goals to drive that program into the future. Studies undertaken throughout the ALMA partnership have identified high-impact initiatives providing major advances in ALMA sensitivity, instantaneous bandwidth and spectral coverage, spatial resolution, and imaging speed. An overview of those initiatives will be given to spur further discussion of the science goals they will enable, and to provide further guiding scientific vision.
2004-02-04
KENNEDY SPACE CENTER, FLA. - Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Behind him at right is Mike Rein, External Affairs division chief. Oliu oversees the image lab that is using an advanced SGI® TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASA’s Marshall Space Flight Center in Alabama in reviewing the tape.
EVA 4 - Massimino with EMS on RMS arm
2002-03-07
STS109-323-035 (7 March 2002) --- Astronaut Michael J. Massimino, on the shuttles robotic arm, prepares to install the Electronic Support Module (ESM) in the aft shroud of the Hubble Space Telescope (HST), with the assistance of astronaut James H. Newman (out of frame). The module will support a new experimental cooling system to be installed during the next day's fifth and final scheduled spacewalk of the mission. That cooling system is designed to bring the telescope's Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) back to life.
Cabana Multi-User Spaceport Tour of KSC
2017-02-17
Members of the news media view the 10 levels of new work platforms in High Bay 3 inside the Vehicle Assembly Building (VAB) during a tour of NASA's Kennedy Space Center in Florida with Center Director Bob Cabana. The final platform, A north, was recently installed. The platforms will surround the Space Launch System and Orion spacecraft on the mobile launcher during processing to prepare for the first test flight. The Ground Systems Development and Operations Program is overseeing upgrades to the VAB, including installation of the new work platforms.
EVA 5 - Grunsfeld installs radiator
2002-03-08
STS109-315-007 (8 March 2002) --- Astronaut John M. Grunsfeld, STS-109 payload commander, anchored on the end of the Space Shuttle Columbias Remote Manipulator System (RMS) robotic arm, moves toward the giant Hubble Space Telescope (HST) temporarily hosted in the orbiters cargo bay. Astronaut Richard M. Linnehan (out of frame) works in tandem with Grunsfeld during this fifth and final session of extravehicular activity (EVA). Activities for the space walk centered around the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) to install a Cryogenic Cooler and its Cooling System Radiator.
Solar domestic hot water system installed at Texas City, Texas
NASA Technical Reports Server (NTRS)
1980-01-01
This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.
Independent evaluation of the transit retrofit package safety applications : final report.
DOT National Transportation Integrated Search
2015-02-01
This report presents the methodology and results of the independent evaluation of retrofit safety packages installed on transit vehicles in the : Safety Pilot Model Deploymentpart of the United States Department of Transportations Intelligent T...
Evaluation of Chem-Crete : final report.
DOT National Transportation Integrated Search
1982-01-01
Two test sections, one on new construction and the other on a maintenance resurfacing project, were installed in the fall of 1980 to evaluate the proprietary product Chem-Crete. Laboratory tests and dynaflect and density measurements were performed o...
Weigh-in-Motion systems evaluation : final report.
DOT National Transportation Integrated Search
1976-04-01
This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilson, L.E.; McGuire, D.R.
1984-05-01
This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less
SafeConnect Solar - Final Scientific/Technical Report (Updated)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McNish, Zachary
2016-02-03
Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less
Field Trial of an Aerosol-Based Enclosure Sealing Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrington, Curtis; Springer, David
2015-09-01
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology.« less
'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adonizio, Mary Ann; Corren, Dean; Smith, Ron
Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.
Final system instrumentation design package for Decade 80 solar house
NASA Technical Reports Server (NTRS)
1978-01-01
The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).
Remedial Investigation Report Area of Contamination (AOC) 43G. Volume 1
1996-02-01
FORT DEVENS FINAL REMEDIAL INVESTIGATION FOR GROUP 2 & 7 SITES FINAL REMEDIAL INVESTIGATION REPORT AREA OF CONTAMINATION ( AOC ) 43G VOLUME I OF II...Liability Act for environmental investigations and remedial actions at Fort Devens . The agreement required that Site Investigations be undertaken at each... Remedial Investigation (RI) Report on Area of Contamination ( AOC ) 43G at the Fort Devens U.S. Army Installation, Massachusetts (
Process Development for Automated Solar Cell and Module Production. Task 4: Automated Array Assembly
NASA Technical Reports Server (NTRS)
Hagerty, J. J.
1981-01-01
The Automated Lamination Station is mechanically complete and is currently undergoing final wiring. The high current driver and isolator boards have been completed and installed, and the main interface board is under construction. The automated vacuum chamber has had a minor redesign to increase stiffness and improve the cover open/close mechanism. Design of the Final Assembly Station has been completed and construction is underway.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bender, W.
2013-01-01
Final technical progress report of SunShot Incubator Solaflect Energy. The project succeeded in demonstrating that the Solaflect Suspension Heliostat design is viable for large-scale CSP installations. Canting accuracy is acceptable and is continually improving as Solaflect improves its understanding of this design. Cost reduction initiatives were successful, and there are still many opportunities for further development and further cost reduction.
KAFFASH-CHARANDABI, Neda; SADEGHI-NIARAKI, Abolghasem; PARK, Dong-Kyun
2015-01-01
Background: Cardiac arrest is a condition in which the heart is completely stopped and is not pumping any blood. Although most cardiac arrest cases are reported from homes or hospitals, about 20% occur in public areas. Therefore, these areas need to be investigated in terms of cardiac arrest incidence so that places of high incidence can be identified and cardiac rehabilitation defibrillators installed there. Methods: In order to investigate a study area in Petersburg, Pennsylvania State, and to determine appropriate places for installing defibrillators with 5-year period data, swarm intelligence algorithms were used. Moreover, the location of the defibrillators was determined based on the following five evaluation criteria: land use, altitude of the area, economic conditions, distance from hospitals and approximate areas of reported cases of cardiac arrest for public places that were created in geospatial information system (GIS). Results: The A-P HADEL algorithm results were more precise about 27.36%. The validation results indicated a wider coverage of real values and the verification results confirmed the faster and more exact optimization of the cost function in the PSO method. Conclusion: The study findings emphasize the necessity of applying optimal optimization methods along with GIS and precise selection of criteria in the selection of optimal locations for installing medical facilities because the selected algorithm and criteria dramatically affect the final responses. Meanwhile, providing land suitability maps for installing facilities across hot and risky spots has the potential to save many lives. PMID:26587471
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reed, Gary
2010-09-30
This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to bemore » self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University’s aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Everett, J.W.; Gattis, J.L.
1994-07-01
In an attempt to find alternate ways of dealing with waste truck tires, a private tire recycling company developed a pipe from the tire bead and sidewall. The tire-pipe has seen limited use as a roadway drainage culvert. To encourage wider use of this product, an evaluation of pipe performance was performed. The evaluation consisted of (1) inspections of existing installations; (2) structural tests; and (3) leakage tests. The study found that the majority of installations were performing well. Compared with corrugated steel and fiberglass pipes, the tire-pipe exhibited favorable structural performance. An individual tire-pipe section was found to bemore » watertight. However, when tested in the open-air (not in the ground), the tire-pipe joints were found to leak. Development of an improved end connection would improve the utility of the tire-pipe.« less
Visual privacy by context: proposal and evaluation of a level-based visualisation scheme.
Padilla-López, José Ramón; Chaaraoui, Alexandros Andre; Gu, Feng; Flórez-Revuelta, Francisco
2015-06-04
Privacy in image and video data has become an important subject since cameras are being installed in an increasing number of public and private spaces. Specifically, in assisted living, intelligent monitoring based on computer vision can allow one to provide risk detection and support services that increase people's autonomy at home. In the present work, a level-based visualisation scheme is proposed to provide visual privacy when human intervention is necessary, such as at telerehabilitation and safety assessment applications. Visualisation levels are dynamically selected based on the previously modelled context. In this way, different levels of protection can be provided, maintaining the necessary intelligibility required for the applications. Furthermore, a case study of a living room, where a top-view camera is installed, is presented. Finally, the performed survey-based evaluation indicates the degree of protection provided by the different visualisation models, as well as the personal privacy preferences and valuations of the users.
Level-2 Milestone 3244: Deploy Dawn ID Machine for Initial Science Runs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, D
2009-09-21
This report documents the delivery, installation, integration, testing, and acceptance of the Dawn system, ASC L2 milestone 3244: Deploy Dawn ID Machine for Initial Science Runs, due September 30, 2009. The full text of the milestone is included in Attachment 1. The description of the milestone is: This milestone will be a result of work started three years ago with the planning for a multi-petaFLOPS UQ-focused platform (Sequoia) and will be satisfied when a smaller ID version of the final system is delivered, installed, integrated, tested, accepted, and deployed at LLNL for initial science runs in support of SSP mission.more » The deliverable for this milestone will be a LA petascale computing system (named Dawn) usable for code development and scaling necessary to ensure effective use of a final Sequoia platform (expected in 2011-2012), and for urgent SSP program needs. Allocation and scheduling of Dawn as an LA system will likely be performed informally, similar to what has been used for BlueGene/L. However, provision will be made to allow for dedicated access times for application scaling studies across the entire Dawn resource. The milestone was completed on April 1, 2009, when science runs began running on the Dawn system. The following sections describe the Dawn system architecture, current status, installation and integration time line, and testing and acceptance process. A project plan is included as Attachment 2. Attachment 3 is a letter certifying the handoff of the system to a nuclear weapons stockpile customer. Attachment 4 presents the results of science runs completed on the system.« less
Prototype Engineered Barrier System Field Test (PEBSFT); Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ramirez, A.L.; Buscheck, T.; Carlson, R.
1991-08-01
This final report represents a summary of data and interpretations obtained from the Prototype Engineered Barrier System Field Test (PEBSFT) performed in G-Tunnel within the Nevada Test Site. The PEBSFT was conducted to evaluate the applicability of measurement techniques, numerical models, and procedures developed for future field tests that will be conducted in the Exploratory Studies Facilities (ESF) at Yucca Mountain. The primary objective of the test was to provide a basis for determining whether tests planned for the ESF have the potential to be successful. Chapter 1 on high frequency electromagnetic tomography discusses the rock mass electromagnetic permittivity andmore » attenuation rate changes that were measured to characterize the water distribution in the near field of a simulated waste container. The data are used to obtain quantitative estimates of how the moisture content in the rock mass changes during heating and to infer properties of the spatial variability of water distribution, leading to conclusions about the role of fractures in the system. Chapter 2 discusses the changes in rock moisture content detected by the neutron logging probe. Chapter 3 permeability tests discusses the characterization of the in-situ permeability of the fractured tuff around the borehole. The air permeability testing apparatus, the testing procedures, and the data analysis are presented. Chapter 4 describes the moisture collection system installed in the heater borehole to trap and measure the moisture volumes. Chapter 5 describes relative humidity measurements made with the thermocouple psychrometer and capacitance sensors. Chapter 6 discusses gas pressure measurements in the G-Tunnel, addressing the calibration and installation of piezoresistive-gaged transducers. Chapter 7 describes the calibration and installation of thermocouples for temperature measurements. Chapter 8 discusses the results of the PEBSFT.« less
The evaluation of pavement patching materials in Oregon : final report.
DOT National Transportation Integrated Search
1980-11-01
This report describes the installation and evaluation of trial pavement patching materials in Oregon. The patches were placed in Portland cement concrete and bituminous concrete pavements and evaluated for periods ranging from four to twelve months. ...
US 93 preconstruction wildlife monitoring field methods handbook : final report.
DOT National Transportation Integrated Search
2006-11-01
The US 93 reconstruction project on the Flathead Indian Reservation in northwest Montana represents one of the most extensive wildlife-sensitive highway design efforts to occur in the continental United States. The reconstruction will include install...
Adiem II end terminal for concrete barrier : final report.
DOT National Transportation Integrated Search
2001-03-01
On September 9, 1997, an ADIEM II (Advanced Dynamic Impact Extension Module) was installed on Interstate 5 near Salem, Oregon. The ADIEM II offered a redirecting, energy-absorbing crash cushion and end treatment for portable and permanent protection ...
Evaluation of Revised Left Turn Signalization : Final Report
DOT National Transportation Integrated Search
1997-11-01
Modified left turn signals had shown cost savings over the old style of traffic signals in initial installation and maintenance. This evaluation was conducted to determine whether those savings would be justified by no increase in the accident rates ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... restructuring. This range of potential installation reduction and growth (ranging from maximum losses of 8,000... with implementation of the two Action alternatives include impacts to air quality; airspace; cultural...
Improving design phase evaluations for high pile rebound sites : final report.
DOT National Transportation Integrated Search
2016-05-31
A testing program performed to help determine typical soils properties encountered during pile installation when high rebound : occurs produced a decision matrix for geotechnical engineers. High pile rebound (HPR) occurred at numerous sites in Florid...
Evaluation of experimental railroad-highway grade crossings in Louisiana : final report : 1970-1985.
DOT National Transportation Integrated Search
1986-04-01
This report concludes formal evaluation of forty-one experimental high-type railroad-highway grade crossings installed experimentally throughout Louisiana between 1970 and 1984. These crossings were composed of various of rubber, high-density polyeth...
Oregon Green Light CVO evaluation : final report : executive summary
DOT National Transportation Integrated Search
2001-04-01
This report summarizes the findings of all of the Detailed Test Plans conducted for the evaluation of the Oregon Green Light Commercial Vehicle Operations (CVO) project. This project was responsible for the installation of 21 systems containing weigh...
Design phase identification of high pile rebound soils : final report
DOT National Transportation Integrated Search
2010-12-15
An engineering problem has occurred when installing displacement piles in certain soils. During driving, piles are rebounding excessively during each hammer blow, causing delay and as a result may not achieve the required design capacities. Piles dri...
Advance traffic control warning systems for maintenance operations : final report.
DOT National Transportation Integrated Search
1976-07-01
The report discusses the effect of certain variables defined by sign size, height of installation and legend on the driver responses as measured by speed, conflict and queuing parameters. Effects of electronically actuated, directional flashing signs...
SMART operational field test evaluation : dispatchers survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...
Guidelines for traffic signal energy back\\0x2010up systems : final report.
DOT National Transportation Integrated Search
2009-07-01
Power outages affect traffic signalized intersections, leading to potentially serious problems. Current practices of responding to power failures are very basic, ranging from do nothing to installing portable generators. The purpose of this res...
ICARUS: An Innovative Large LAR Detector for Neutrino Physics
NASA Astrophysics Data System (ADS)
Vignoli, C.; Barni, D.; Disdier, J. M.; Rampoldi, D.; Icarus Collaboration
2006-04-01
ICARUS is an international project that foresees the installation of very large LAr detectors inside the Gran Sasso underground laboratory in order to be sensitive to rare phenomena of particle physics. The detection technique is based on the collection of electrons produced by particle interactions in LAr by a matrix of thousands of thin wires. At the moment the project foresees the installation of a 600,000-kg vessel (T600). The total amount of LAr can be expanded in a modular way to masses of the order of 106 kg. The T600 houses two identical 300,000-kg Ar sub-cryostats that are aluminum boxes about 20-m long, 4-m high and 4-m wide. Safety requirements for the underground installation have led to a unique design for the vessels to prevent LAr spillages even in the case of inner cryostat failure. Electrons must drift over meters requiring the development of special gas and liquid Ar purification units to provide an extremely high LAr purity (better then 0.1 ppb). The cooling system has been designed to assure a high thermal uniformity in the detector volume (less than 1-K differential). The cryogenic system associated with the final ICARUS configuration is based on three N2 refrigerators, three 30-m3 tanks and pump driven two-phase N2 forced-flow cooling of the various sub-systems. The T600 was successfully tested in Pavia in 2001 and it is now under installation in Gran Sasso for final operation. The future mass expansion strategy is under investigation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, J.; Mowrey, J.
1995-12-01
This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less
Availability model of stand-alone photovoltaic system
NASA Astrophysics Data System (ADS)
Mazurek, G.
2017-08-01
In this paper we present a simple, empirical model of stand-alone photovoltaic power system availability. The model is a final result of five-year long studies and ground measurements of solar irradiation carried out in Central Europe. The obtained results facilitate sizing of PV modules that have to be installed with taking into account system's availability level in each month of a year. The model can be extended to different geographical locations, with help of local meteorological data or solar irradiation datasets derived from satellite measurements.
Feasibility Study of Food Waste Co-Digestion at U.S. Army Installations
2017-03-01
sludge and food these, waste materials can create energy in the form of electric power for the plant. The extra heat and power generated from this... formed at Fort Huachuca provided detailed analyses of the waste stream, primary generators of each waste component, and a measured sample from the...tanks. The second tank will be the current first tank, where the majority of methane will be formed , and the last tank will remain as the final rest
Installation of a Roof Mounted Photovoltaic System
NASA Astrophysics Data System (ADS)
Lam, M.
2015-12-01
In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.
Evaluation of experimental installation of silane treatment on bridges : final report.
DOT National Transportation Integrated Search
1988-04-01
In this project the effectiveness of silane-based chemicals as concrete sealants was evaluated for selected bridges throughout the state of Louisiana for a five-year period. The field evaluation was initiated after satisfactory results in the laborat...
Final phase II report : SR 395 Spokane FY99 earmark evaluation
DOT National Transportation Integrated Search
2001-09-20
The U.S. Federal Highway Administration (FHWA) has provided funding to the Washington State Department of Transportation (WSDOT) to install a road and weather information system in the mostly rural and mountainous region north of Spokane, Washington ...
Community Solar Program Final Report for Austin Energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
Austin Energy seeks to expand its portfolio of renewable programs with an innovative community solar program. The program provides an opportunity for Austin Energy's customers, who are unable or uninterested in installing solar on their own premises, to purchase solar power.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) COST RECOVERY REGULATIONS, COMMUNICATIONS.... Business unit means any segment of an organization for which cost data are routinely accumulated by the... accumulation system, is one of the final accumulation points. Installed or deployed means that, on a specific...
SMART operational field test evaluation : scheduler survey report : final report
DOT National Transportation Integrated Search
1997-06-01
The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...
A high school is supplied with solar energy--Dallas, Texas
NASA Technical Reports Server (NTRS)
1981-01-01
System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.
Little Goose Dam Full Flow PIT-Tag Detection System Project Summary.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warf, Don; Livingston, Scott
2009-04-16
In 2006, the design phase of this project was kicked off and was for the most part modeled after the Full Flow PIT installation installed at Lower Monumental Dam during winter and spring of 2006 and 2007. As the Goose Full Flow design progressed and the project started to move towards construction, issues within contracting occurred and the project was put on delay for 1 year. Starting in mid December of 2008, Harcon Inc. was awarded the contract and construction of the new Goose Full Flow PIT-tag detection system began. The purpose of this document is to summarize the installationmore » of the Little Goose Full Flow project from start to finish and to highlight the notable successes and challenges that the installation presented along with the final results and current status.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hodge, Brian S; Mather, Barry A; Cho, Gyu-Jung
Capacitor banks have been generally installed and utilized to support distribution voltage during period of higher load or on longer, higher impedance, feeders. Installations of distributed energy resources in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile across a feeder, and therefore when a new capacitor bank is needed analysis of optimal capacity and location of the capacitor bank is required. In this paper, we model a particular distribution system including essential equipment. An optimization method is adopted to determine the best capacitymore » and location sets of the newly installed capacitor banks, in the presence of distributed solar power generation. Finally we analyze the optimal capacitor banks configuration through the optimization and simulation results.« less
Treatment of wastewater from flue gas desulphurization plants in the Netherlands
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vredenbregt, L.H.J.; Brugghen, F.W. van der; Enoch, G.D.
1995-06-01
In the Netherlands, all coal fired boilers of power stations are equipped with a wet lime(stone)-gypsum flue gas desulphurization (FGD) installation in order to fulfill the emission demands for SO{sub 2}. These wet FGD installations produce a wastewater stream containing impurities like suspended solids and traces of heavy metals like As, Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se and Za. As the target values stated by the licensing authorities are very stringent, most of these heavy metals and suspended solids have to be removed to very low concentration levels. Therefore, a very efficient treatment method, based on coprecipitation ofmore » heavy metal hydroxides and sulphides, which was developed by KEMA, has been installed at all, the coal fired power plants. This paper describes the operational experiences until now with these wastewater treatment installations at two coal fired power plants using sea-water for make-up and one using fresh water. The following aspects will be discussed in more detail: reliability of the wastewater treatment processes both with respect to removal efficiency of heavy metals and suspended solids and plant operation itself influence of a changing composition of the wastewater on the performance of these wastewater treatment installations. Finally, also the impact of co-firing of the sludge produced in these wastewater treatment installations will be discussed.« less
Evaluation of the new infrastructure for French Permanent Broadband Stations in Auvergne (France).
NASA Astrophysics Data System (ADS)
Douchain, J. M.; Regis, E.; Battaglia, J.; Vergne, J.
2017-12-01
French seismologic and geodetic network (RESIF) is a national equipment for the observation and understanding of the solid Earth. It is an instrument aimed at acquiring new top-quality data for disciplines like seismology, geodesy and gravimetry to advance the understanding of the dynamics of our planet. The seismology component of RESIF, with its homogeneous coverage of the territory, will allow better localisation and characterisation of seismic activityover a wide range of magnitudes as well as provide high quality data for research The Auvergne Seismic Network (ASN) manages seismic stations in the center of france since the beginning of the 80's and continuously ugrades them. Nowadays, 21 stations (velocimeters and accelerometers) are deployed to monitor the Massif Central seismic activity. In the future, the ASN will run 15 broadband stations that will be part of RESIF network. Six of theses sites already have former generation instrumentation (short period sensors buried in the ground, low dynamic) but others are completely new. In june 2017, 4 permanent seismic stations have been upgraded to the new standard installation type for open environment. The chozen infrastructure is a 5 meter drilling equiped with a posthole broadband sensor. Prior to these final installations, on each site, Trillium 120 PA have been installed for 2 temporary experiments. The first one consisted of a direct burial installations at about 80 centimeters depth and lasted for 1 or 2 months. The second dataset was recorded in shallow seismic vaults, during 6 months.In this study, we compare, for each site, data recorded with the 3 configurations in order to evaluate the profits of the new RESIF installations. For this purpose, we compare the probability density fonctions to evaluate noise levels, as well as sprectrograms and hourly detection number. Our results show that the installation of sensors in drillings greatly improves the quality of data at low and high frequencies.
2006-09-22
This final rule adopts the substance of the April 15, 2004 tentative interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment allows certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This final rule also requires that nursing facilities at least install battery-operated single station smoke alarms in resident rooms and common areas if they are not fully sprinklered or they do not have system-based smoke detectors in those areas. Finally, this final rule confirms as final the provisions of the March 25, 2005 interim final rule with changes and responds to public comments on that rule.
32 CFR 806.5 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... instructions to MAJCOMs. Responsibilities of other Air Force elements follow. (b) SAF/GCA makes final decisions on FOIA administrative appeals. (c) Installation commanders will: Comply with FOIA electronic reading... commanders implement this instruction and appoint a FOIA manager, in writing. Send the name, phone number...
Polymer concrete overlay test program : Lebanon Ditch Bridge : final report.
DOT National Transportation Integrated Search
1983-01-01
This report presents information on the installation of a thin polymer concrete overlay and the evaluation of its durability after a 15-month in-service period. The project was performed by the Oregon State Highway Division under the sponsorship of t...
DOT National Transportation Integrated Search
2017-11-01
This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority o...
DEMONSTRATION OF RADON RESISTANT CONSTRUCTION TECHNIQUES - PHASE II. FINAL REPORT
The report gives results of a demonstration of radon resistant construction techniques. Sub-slab mitigation systems were installed (in accordance with draft standards) in 15 new Florida houses in 1992, and these houses have undergone extensive testing to validate techniques used ...
DOT National Transportation Integrated Search
2005-07-05
The Oregon Department of Transportation (ODOT) has installed several stormwater : treatment facilities throughout the State to improve the quality of runoff discharged from : highways. These facilities include a variety of both above ground and below...
Ice detection systems : experimental feature : final report.
DOT National Transportation Integrated Search
1986-01-01
In the fall of 1980, an experimental ice detection system was installed on the Fremont Bridge in Portland, Oregon. this bridge, which caries I-405 over the Willamette River, has a history of icing problem when the deck is wet and the temperature hove...
Effective field use of high-range, water-reduced concrete : final report.
DOT National Transportation Integrated Search
1981-01-01
This report describes the experience of the Virginia Department of Highways and Transportation with the use of high range, water reduced (HRWR) concrete. A description of the installation of the HRWR concrete in two pavements and four bridge decks, a...
77 FR 28285 - Positive Train Control Systems (RRR)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-14
...-0028, Notice No. 3] RIN 2130-AC27 Positive Train Control Systems (RRR) AGENCY: Federal Railroad... railroads to install positive train control (PTC) systems. This final rule removes regulatory provisions... Safety Assurance and Compliance, Staff Director, Signal & Train Control Division, Federal Railroad...
ERIC Educational Resources Information Center
Roark, Steven
2001-01-01
Presents the fifth installment examining the expansion and renovation project of Longview Community College's Liberal Arts Building in Kansas City (Missouri). Reviewed are the gaining of final approvals from administrators on project plans and the detailing of wall construction, structural systems, HVAC units, and finishes. (GR)
Code of Federal Regulations, 2010 CFR
2010-01-01
... ENERGY (CONTINUED) ALTERNATE FUELS ADMINISTRATIVE PROCEDURES AND SANCTIONS Investigations, Violations... for each violation: Any person who operates a powerplant or major fuel burning installation under an... (ii) Notice of noncompliance is a final Fuel Use Order issued under § 501.167 of this part. [46 FR...
DOT National Transportation Integrated Search
2017-10-16
This Concept of Operations (ConOps) is the final installment in a series of three reports focused on identifying opportunities for the application of Intelligent Transportation System (ITS) technologyor equivalentwithin the maritime transportat...
Guidelines for traffic signal energy back-up systems : final report, August 2009.
DOT National Transportation Integrated Search
2009-07-01
Current practices of responding to power failures are very basic, ranging from 'do nothing' to installing portable generators. The purpose of this research project was to provide the NYSDOT with a better understand the practices of other agencies in ...
Seasonal instrumentation of SHRP pavements, the Ohio State University : final report.
DOT National Transportation Integrated Search
1998-09-01
Environmental instruments to measure temperature, soil moisture and frost depth were installed at five test sections of the SHRP pavement project on U.S. 23 north of Delaware, Ohio. At three of these locations tensiometers, which a designed to measur...
How reliable are odour assessments?
Bokowa, A; Beukes, J A
2012-01-01
This paper will demonstrate the differences found in odour test results, when odour sampling is performed at the same sources by two different consultants. By examining two case studies, this paper will highlight that the difference between the results can be significant. Both studies are based on odour sampling programs determining the odour removal efficiency of odour control units installed at two different facilities: a pet food facility and an oil/grease recycling facility. The first study is based on odour measurements at the inlet and outlet of the unit installed by Applied Plasma Physics AS at the pet food facility. Odour assessments were performed by two separate consultants at the same time. The second study is based on testing of the odour removal effectiveness of two units: a scrubber and a biofilter at an oil/grease recycling facility. During this study two odour sampling programs were performed by two consultants at different times, but under the same process conditions. This paper will show how varying results can play a role in choosing the adequate odour control technologies. The final results suggest that although, an odour control unit may appear to be insufficient, it actually is successful at removing the odours.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rhykerd, Robert; Bierma, Thomas; Jin, Guang
2014-03-31
This project had two parts. Part 1 was an economic and environmental assessment of switchgrass production on high-fertility soil, and included an assessment of the effects of field irrigation with treated municipal wastewater (Studies A,C, and E in Final Agreement). Part 2 was an assessment of methods to enhance anaerobic digestion of switchgrass, and included evaluation of several other potential biomass feedstocks (Studies B and D in Final Agreement). Results from Part 1 demonstrated that switchgrass does not compete economically against a corn and soybean rotation on highly productive soils. All four varieties of switchgrass lost money while corn andmore » soybeans were profitable in all four years of this study. Breakeven prices for the four switchgrass varieties were calculated using production costs. The installation of a center pivot irrigation system had minimal impact on crop production and corn and soybean production remained profitable in the year the irrigator was installed. Because of drought and delays in installing the wastewater treatment plant, the irrigation system was not used until year 4 of this study. Therefore, longer term studies evaluating multiple year studies on the impact of irrigation on switchgrass are warranted. Results from irrigating with treated municipal wastewater showed no negative impact on soil quality. Results from Part 2 demonstrated that anaerobic digestion (AD) of switchgrass could be significantly enhanced using low heat (100oC) and mild caustic pretreatment without fine-grinding. Heat for pretreatment could be available from biogas-based combined heat and power (CHP) systems. In bench-top digesters simulating municipal wastewater treatment AD, methane production of coarse-ground switchgrass increased over 20-fold with pretreatment compared to untreated switchgrass. Bench-top studies simulating dairy-based AD also found high specific methane yield, but even untreated switchgrass digested reasonably well, indicating the value of AD micro-organisms acclimated to lignocellulosic feedstock. Similar results were found for corn stover. However, oak and maple leaves – representing common urban yard waste – were more resistant to digestion even with pretreatment. More pretreatment research is required before yard waste could become a significant feedstock for the low/medium-solids digesters common to municipal wastewater or livestock operations.« less
2004-10-05
KENNEDY SPACE CENTER, FLA. - In Hangar AE at Cape Canaveral Air Force Station, technicians take a final look at the blankets installed on the Swift spacecraft. The blankets provide thermal stability during the mission. Swift is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. The most comprehensive study of GRB afterglows to date, Swift is expected to observe more than 200 gamma-ray bursts during its 2-year mission.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreitman, Paul J.; Sirianni, Steve R.; Pillard, Mark M.
Entergy recently performed an Extended Power Up-rate (EPU) on their Grand Gulf Nuclear Station, near Port Gibson, Mississippi. To support the EPU, a new Steam Dryer Assembly was installed during the last refueling outage. Due to limited access into the containment, the large Replacement Steam Dryer (RSD) had to be brought into the containment in pieces and then final assembly was completed on the refueling floor before installation into the reactor. Likewise, the highly contaminated Original Steam Dryer (OSD) had to be segmented into manageable sections, loaded into specially designed shielded containers, and rigged out of containment where they willmore » be safely stored until final disposal is accomplished at an acceptable waste repository. Westinghouse Nuclear Services was contracted by Entergy to segment, package and remove the OSD from containment. This work was performed on critical path during the most recent refueling outage. The segmentation was performed underwater to minimize radiation exposure to the workers. Special hydraulic saws were developed for the cutting operations based on Westinghouse designs previously used in Sweden to segment ABB Reactor Internals. The mechanical cutting method was selected because of its proven reliability and the minimal cutting debris that is generated by the process. Maintaining stability of the large OSD sections during cutting was accomplished using a custom built support stand that was installed into the Moisture Separator Pool after the Moisture Separator was installed back in the reactor vessel. The OSD was then moved from the Steam Dryer Pool to the Moisture Separator Pool for segmentation. This scenario resolved the logistical challenge of having two steam dryers and a moisture separator in containment simultaneously. A water filtration/vacuum unit was supplied to maintain water clarity during the cutting and handling operations and to collect the cutting chips. (authors)« less
Composite material pedestrian bridge for the Port of Bilbao
NASA Astrophysics Data System (ADS)
Gorrochategui, I.; Manteca, C.; Yedra, A.; Miguel, R.; del Valle, F. J.
2012-09-01
Composite materials in comparison to traditional ones, steel and concrete, present advantages in civil works construction: lower weight, higher corrosion resistance (especially in the marine environment), and ease of installation. On the other hand, fabrication costs are generally higher. This is the reason why this technology is not widely used. This work illustrates the process followed for the design, fabrication and installation of a composite material pedestrian bridge in the Port of Bilbao (Northern Spain). In order to reduce the price of the bridge, the use of low cost materials was considered, therefore polyester resin was selected as the polymeric matrix, and glass fibres as reinforcement. Two material choices were studied. Currently in the market there is high availability of carbon nanoparticles: carbon nanotubes (CNT) and carbon nanofibres (CNF), so it was decided to add this kind of nanoparticles to the reference material with the objective of improving its mechanical properties. The main challenge was to transfer the CNT and CNF excellent properties to the polymeric matrix. This requires dispersing the nanoreinforcements as individual particles in the polymeric matrix to avoid agglomerates. For this reason, an advanced high shear forces dispersion technique (called "three roll mills") was studied and implemented. Also surface functionalization of the nanoreinforcements by chemical treatment was carried out. Herein, a comparison is performed between both materials studied, the explanation of the employment of the reference material (without nanoreinforcement) as the one used in the fabrication of the pedestrian bridge is justified and, finally, the main characteristics of the final design of the structural element are described.
Core network infrastructure supporting the VLT at ESO Paranal in Chile
NASA Astrophysics Data System (ADS)
Reay, Harold
2000-06-01
In October 1997 a number of projects were started at ESO's Paranal Observatory at Cerro Paranal in Chile to upgrade the communications infrastructure in place at the time. The planned upgrades were to internal systems such as computer data networks and telephone installations and also data links connecting Paranal to other ESO sites. This paper details the installation work carried out on the Paranal Core Network (PCN) during the period of October 1997 to December 1999. These installations were to provide both short term solutions to the requirement for reliable high bandwidth network connectivity between Paranal and ESO HQ in Garching, Germany in time for UTI (Antu) first light and perhaps more importantly, to provide the core systems necessary for a site moving towards operational status. This paper explains the reasons for using particular cable types, network topology, and fiber backbone design and implementation. We explain why it was decided to install the PCN in two distinct stages and how equipment used in temporary installations was re-used in the Very Large Telescope networks. Finally we describe the tools used to monitor network and satellite link performance and will discuss whether network backbone bandwidth meets the expected utilization and how this bandwidth can easily be increased in the future should there be a requirement.
Program Evaluation Grant. Final Report.
ERIC Educational Resources Information Center
Quadco Rehabilitation Center, Inc., Stryker, OH.
The purpose of the project was to increase the effectiveness and efficiency of those rehabilitation facilities which were utilized by the Ohio Rehabilitation Services Commission (RSC) through the development, installation, and utilization of a program evaluation system and a management information system. The two systems were developed and…
DOT National Transportation Integrated Search
2009-12-01
This is a performance evaluation report for A-Jacks, an articulated concrete block designed to protect bridge elements exposed to the river scouring forces, and for Aquawrap, a glass fiber reinforced polymer designed to protect and strengthen bridge ...
Field instrumentation of dowels : final report, May 1997.
DOT National Transportation Integrated Search
1997-04-01
Four different types of dowels, 11/2 inch diameter epoxy-coated steel bars, 11/2 inch diameter fiberglass, 1 1/2 deep steel and fiberglass I-beams, were instrumented with strain gages and installed. Forces that developed in these dowel bars due to cu...
Design and evaluation of modified centerline rumble strips : final report.
DOT National Transportation Integrated Search
2017-03-08
A centerline rumble strip (CLRS) is primarily installed on the centerline of undivided two-lane and two-way roadways : to alert drivers that they are moving out of their intended travel lane. The main purpose of CLRSs is to reduce crossover : collisi...
DOT National Transportation Integrated Search
2009-08-01
In 1976 the Federal Highway Administration (FHWA) approved federal aid funding for experimental : installations of corrosion protection for reinforcing steel in existing concrete bridge decks. Sixteen of the sixty-nine : Kansas bridges with Cost Effe...
77 FR 11385 - Security Considerations for Lavatory Oxygen Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...
2005 Base Closure and Realignment Commission Report
The 2005 Defense Base Closure and Realignment Commission is proud to present its Final Report for your consideration. As required by law, the Commission thoroughly and objectively reviewed the domestic installation closure and realignment recommendations proposed by the Secretary of Defense on May 13, 2005.
Cost effective solar hot water system for econo-travel motor hotel located at Hampton, VA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-11-01
This paper gives the final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 2708 Mercury Boulevard, Hampton, Virginia. The description of the system along with the final cost breakdown, performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryersmore » used for the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less
Pegasus XL CYGNSS Final Wing Installation
2016-09-28
Inside Building 1555 at Vandenberg Air Force Base in California, technicians and engineers perform final wing installations on the Orbital ATK Pegasus XL rocket which will launch eight NASA Cyclone Global Navigation Satellite System, or CYGNSS, spacecraft. When preparations are completed at Vandenberg, the rocket, with CYGNSS in its payload fairing, will be attached to the Orbital ATK L-1011 carrier aircraft and transported to NASA’s Kennedy Space Center in Florida. On Dec. 12, 2016, the carrier aircraft is scheduled to take off from the Skid Strip at Cape Canaveral Air Force Station and CYGNSS will launch on the Pegasus XL rocket with the L-1011 flying off shore. CYGNSS will make frequent and accurate measurements of ocean surface winds throughout the life cycle of tropical storms and hurricanes. The data that CYGNSS provides will enable scientists to probe key air-sea interaction processes that take place near the core of storms, which are rapidly changing and play a critical role in the beginning and intensification of hurricanes.
Commercialization of PV-powered pumping systems for use in utility PV service programs. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-03-01
The project described in this report was a commercialization effort focused on cost-effective remote water pumping systems for use in utility-based photovoltaic (PV) service programs. The project combined a commercialization strategy tailored specifically for electric utilities with the development of a PV-powered pumping system that operates conventional ac pumps rather than relying on the more expensive and less reliable PV pumps on the market. By combining these two attributes, a project goal was established of creating sustained utility purchases of 250 PV-powered water pumping systems per year. The results of each of these tasks are presented in two parts containedmore » in this Final Summary Report. The first part summarizes the results of the Photovoltaic Services Network (PSN) as a new business venture, while the second part summarizes the results of the Golden Photon system installations. Specifically, results and photographs from each of the system installations are presented in this latter part.« less
International Space Station (ISS)
1999-09-01
This image shows the Integrated Truss Assembly S-1 (S-One), the Starboard Side Thermal Radiator Truss, for the International Space Station (ISS) undergoing final construction in the Space Station manufacturing facility at the Marshall Space Flight Center. The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. Delivered and installed by the STS-112 mission, the S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. Manufactured by the Boeing Company in Huntington Beach, California, the truss primary structure was transferred to the Marshall Space Flight Center in February 1999 for hardware installations and manufacturing acceptance testing.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.; Nellums, R.O.
1979-08-01
The A.T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.; Nellums, R.O.
1979-08-01
The A. T. Kearney and Alcoa economic studies are two independent attempts to assess the installed costs of a series of six Darrieus vertical axis wind turbine designs. The designs cover a range of sizes with peak outputs from 10 to 1600 kW. All are designed to produce utility grid electrical power. Volume IV of this report summarizes, compares, and analyzes the results of these studies. The Kearney and Alcoa final reports are included in the Appendices.
Alternative power supply systems for remote industrial customers
NASA Astrophysics Data System (ADS)
Kharlamova, N. V.; Khalyasmaa, A. I.; Eroshenko, S. A.
2017-06-01
The paper addresses the problem of alternative power supply of remote industrial clusters with renewable electric energy generation. As a result of different technologies comparison, consideration is given to wind energy application. The authors present a methodology of mean expected wind generation output calculation, based on Weibull distribution, which provides an effective express-tool for preliminary assessment of required installed generation capacity. The case study is based on real data including database of meteorological information, relief characteristics, power system topology etc. Wind generation feasibility estimation for a specific territory is followed by power flow calculations using Monte Carlo methodology. Finally, the paper provides a set of recommendations to ensure safe and reliable power supply for the final customers and, subsequently, to provide sustainable development of the regions, located far from megalopolises and industrial centres.
Proposed Columbia Wind Farm No. 1 : Final Environmental Impact Statement, Joint NEPA/SEPA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Klickitat County
1995-09-01
CARES proposes to construct and operate the 25 megawatt Columbia Wind Farm No. 1 (Project) in the Columbia Hills area of Klickitat County, Washington known as Juniper Point. Wind is not a constant resource and based on the site wind measurement data, it is estimated that the Project would generate approximately 7 average annual MWs of electricity. BPA proposes to purchase the electricity generated by the Project. CARES would execute a contractual agreement with a wind developer, to install approximately 91 wind turbines and associated facilities to generate electricity. The Project`s construction and operation would include: install concrete pier foundationsmore » for each wind turbine; install 91 model AWT-26 wind turbines using 43 m high guyed tubular towers on the pier foundations; construct a new 115/24-kv substation; construct a 149 m{sup 2} steel operations and maintenance building; install 25 pad mount transformers along the turbine access roads; install 4.0 km of underground 24 kv power collection lines to collect power from individual turbines to the end of turbine strings; install 1.2 km of underground communication and transmission lines from each turbine to a pad mount transformer; install 5.6 km of 24 kv wood pole transmission lines to deliver electricity from the pad mount transformers to the Project substation; install 3.2 km of 115 kv wood pole transmission lines to deliver electricity from the Project substation to the Public Utility District No. 1 of Klickitat County(PUD)115 kv Goldendale line; interconnect with the BPA transmission system through the Goldendale line and Goldendale substation owned by the PUD; reconstruct, upgrade, and maintain 8.0 km of existing roads; construct and maintain 6.4 km of new graveled roads along the turbine strings and to individual turbines; and install meteorological towers guyed with rebar anchors on the Project site.« less
Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization
Jarlath McEntee
2015-10-01
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hydrokinetic turbine to provide electric power for the village. There were six distinct phases of work for this project. The first was a literature review and investigation of prior surveys and hydrologic studies done in the area. The second, third, fourth, and fifth phases consisted of four field expeditions conducted over the summer and fall of 2011. These expeditions consisted of an initial reconnaissance, multi beam bathymetric surveys, flow velocity and discharge measurements, a survey of water levels, and detailed flow velocity studies. The final phase of the project was complete data reduction, and preparation of the final report with its accompanying map sheets and data packages. This submission contains the final report for the Kvichak River RiISEC Project in addition to weather data for Igiugig, AK, Summer 2015.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fittipaldi, J.J.; Sliwinski, B.J.
1991-06-01
Army environmental planning and compliance activities continue to grow in magnitude and complexity, straining the resources of installation environmental offices. New efficiencies must be found to meet the increasing demands of planning and compliance imperatives. This study examined how office automation/information technology (OA/IT) may boost productivity in U.S. Army Training and Doctrine Command (TRADOC) installation environmental offices between now and the year 2000. A survey of four TRADOC installation environmental offices revealed that the workload often exceeds the capacity of staff. Computer literacy among personnel varies widely, limiting the benefits available from OA/IT now in use. Since environmental personnel aremore » primarily gatherers and processors of information, better implementation of OA/IT could substantially improve work quality and productivity. Advanced technologies expected to reach the consumer market during the 1990s will dramatically increase the potential productivity of environmental office personnel. Multitasking operating environments will allow simultaneous automation of communications, document processing, and engineering software. Increased processor power and parallel processing techniques will spur simplification of the user interface and greater software capabilities in general. The authors conclude that full implementation of this report's OA/IT recommendations could double TRADOC environmental office productivity by the year 2000.« less
NASA Technical Reports Server (NTRS)
Tran, Donald H.
2004-01-01
A parametric study is conducted to evaluate a mixed-flow turbofan equipped with a supersonic through-flow rotor and a supersonic counter-rotating diffuser (SSTR/SSCRD) for a Mach 2.4 civil transport. Engine cycle, weight, and mission analyses are performed to obtain a minimum takeoff gross weight aircraft. With the presence of SSTR/SSCRD, the inlet can be shortened to provide better pressure recovery. For the same engine airflow, the inlet, nacelle, and pylon weights are estimated to be 73 percent lighter than those of a conventional inlet. The fan weight is 31 percent heavier, but overall the installed engine pod weight is 11 percent lighter than the current high-speed civil transport baseline conventional mixed-flow turbofan. The installed specific fuel consumption of the supersonic fan engine is 2 percent higher than that of the baseline turbofan at supersonic cruise. Finally, the optimum SSTR/SSCRD airplane meets the FAR36 Stage 3 noise limit and is within 7 percent of the baseline turbofan airplane takeoff gross weight over a 5000-n mi mission.
NASA Astrophysics Data System (ADS)
Dwyer, S.; LIGO Scientific Collaboration
2015-05-01
Advanced LIGO is currently in the final stages of installation and early commissioning. In the design of Advanced LIGO a key goal was the ability to detect gravitational waves from compact object binary inspirals, as these are thought to be the most likely candidates for early detections with ground based interferometers. Special emphasis has been placed on improving the low frequency sensitivity relative to the first generations of LIGO, in addition to improving the high frequency sensitivity by increasing the laser power. The interferometer in Livingston Louisiana has been locked (continuously held within the linear operating range) and noise investigations have begun, and the major installation activities for the interferometer at Hanford, Washington are completed.
2009-07-27
S127-E-009322 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Prospects of very high power CO{sub 2} laser in welding
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goussain, J.C.; Vire, S.
1996-12-31
A 45 kW laser system was recently installed at Institut de Soudure (IS) in France in order to evaluate the possibilities of such high power beams in welding. Some results of welding various materials (Ta6V, C-steel, Cr-Ni alloys), different thicknesses (>30 mm) and large components (several meters) are presented. Some recent installations of high power laser equipment already integrated into production site or under development in shipbuilding and steel fabrication are described. Finally the objectives of an important R and D program launched recently for exploring the different aspects of laser welding in thick section steel fabrication is outlined.
International Space Station (ISS)
2001-08-01
The STS-110 mission began the third and final phase of construction for the International Space Station (ISS) by delivering and installing the Starboard side S0 (S-zero) truss segment that was carried into orbit in the payload bay of the Space Shuttle Atlantis. The STS-110 crew patch is patterned after the cross section of the S0 truss, and encases the launch of the Shuttle Atlantis and a silhouette of the ISS as it will look following mission completion. The successfully installed S0 segment is highlighted in gold. The three prominent flames blasting from the shuttle emphasizes the first shuttle flight to use three Block II Main Engines.
The SPACEHAB payload is installed in the PCR at LC 39A awaiting further STS-89 processing
NASA Technical Reports Server (NTRS)
1997-01-01
The SPACEHAB payload arrived at Launch Pad 39A this morning and was installed in the Payload Changeout Room. Final preparations for liftoff of the STS-89 mission are under way. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir.
1994-10-01
right side door. To minimize retinal exposure to UV, use UV protective eyeglasses and use the offset dental mirror to read the micrometer 6.7.4.3 To...States Air Force) Volatiles Analysis by GC/MS Method 8260 - (United States Air Force) Organochlorine Pesticides and PCBs by GC/ECD Method 8081...decreasing throughout the three or four exposures . The RSD will sometimes be higher than normal in these cases. Samples that are affected by possible carry
Code of Federal Regulations, 2014 CFR
2014-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... be made on the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. ...
Code of Federal Regulations, 2012 CFR
2012-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... be made on the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. ...
Code of Federal Regulations, 2013 CFR
2013-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... be made on the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. ...
DOT National Transportation Integrated Search
2011-07-01
This final report is intended to provide information regarding the performance of crack sealants supplied and installed by : three manufacturers for experimental use in a three-year evaluation of in-service pavements on three Colorado highways. : In ...
DOT National Transportation Integrated Search
2015-10-21
This report summarizes the results of the work performed to install a diesel vapor reclamation unit (DVRU) on an SD70 MAC : locomotive of BNSF Railways and its performance evaluation during freight railroad service. One complete DVRU with several : s...
77 FR 65808 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
... Airworthiness Directives; Airbus Airplanes AGENCY: Federal Aviation Administration (FAA), Department of... Airbus Model A320-214 and -232 airplanes. This AD was prompted by reports that medium-head fasteners were... installation of upper panels on Frame 35 in Airbus A320 final assembly line. Investigations revealed that...
DOT National Transportation Integrated Search
1995-02-01
In 1920, to provide for the safety of drivers on the Columbia River Highway, two-rail timber guardrail were installed. Subsequently, the two-rail timber guardrail were replaced by more modern guardrail. Recently, the Historic Columbia River Highway A...
Void Fraction Instrument operation and maintenance manual
DOE Office of Scientific and Technical Information (OSTI.GOV)
Borgonovi, G.; Stokes, T.I.; Pearce, K.L.
This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.
DOT National Transportation Integrated Search
2016-06-01
This project evaluated the performance of active noise control (ANC) and active vibration control (AVC) technologies using a GP40-2 locomotive located at the Transportation Technology Center (TTC) near Pueblo, CO, to determine the applicability of AN...
14 CFR 1216.310 - Preparation of final statements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... statement to the EPA Office of Federal Activities, to all parties who commented, and to other interested... environment impact statements shall also be available at the NASA Information Center, 600 Independence Avenue, SW., Washington, DC 20546; at information centers at appropriate NASA field installations; and at...
14 CFR 1216.310 - Preparation of final statements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... statement to the EPA Office of Federal Activities, to all parties who commented, and to other interested... environment impact statements shall also be available at the NASA Information Center, 600 Independence Avenue, SW., Washington, DC 20546; at information centers at appropriate NASA field installations; and at...
14 CFR 1216.310 - Preparation of final statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... statement to the EPA Office of Federal Activities, to all parties who commented, and to other interested... environment impact statements shall also be available at the NASA Information Center, 600 Independence Avenue, SW., Washington, DC 20546; at information centers at appropriate NASA field installations; and at...
Research on Joint Sealant Materials to Improve Installation and Performance : Final Report
DOT National Transportation Integrated Search
2017-12-01
The objectives of this project were to 1) identify failure modes and their mechanisms in joint seals in Texas, and to 2) identify what needs to be done to minimize the failures and improve joint seal performance. To achieve these objectives efficient...
Optimizing the use of the thermal integrity system for evaluating auger-cast piles [summary].
DOT National Transportation Integrated Search
2016-07-01
Auger-cast-in-place (ACIP) piles offer an efficient method of constructing and installing piles, : but because the ACIP process is essentially blind and the configuration of the final pile cannot be : assured, applications for ACIP piles have been li...
DOE Office of Scientific and Technical Information (OSTI.GOV)
This report presents the results from several demonstrations of a new method for sealing building envelope air leaks using an aerosol sealing process developed by the Western Cooling Efficiency Center at UC Davis. The process involves pressurizing a building while applying an aerosol sealant to the interior. As air escapes through leaks in the building envelope, the aerosol particles are transported to the leaks where they collect and form a seal that blocks the leak. Standard blower door technology is used to facilitate the building pressurization, which allows the installer to track the sealing progress during the installation and automaticallymore » verify the final building tightness. Each aerosol envelope sealing installation was performed after drywall was installed and taped, and the process did not appear to interrupt the construction schedule or interfere with other trades working in the homes. The labor needed to physically seal bulk air leaks in typical construction will not be replaced by this technology. However, this technology is capable of bringing the air leakage of a building that was built with standard construction techniques and HERS-verified sealing down to levels that would meet DOE Zero Energy Ready Homes program requirements. When a developer is striving to meet a tighter envelope leakage specification, this technology could greatly reduce the cost to achieve that goal by providing a simple and relatively low cost method for reducing the air leakage of a building envelope with little to no change in their common building practices.« less
Visual Privacy by Context: Proposal and Evaluation of a Level-Based Visualisation Scheme
Padilla-López, José Ramón; Chaaraoui, Alexandros Andre; Gu, Feng; Flórez-Revuelta, Francisco
2015-01-01
Privacy in image and video data has become an important subject since cameras are being installed in an increasing number of public and private spaces. Specifically, in assisted living, intelligent monitoring based on computer vision can allow one to provide risk detection and support services that increase people's autonomy at home. In the present work, a level-based visualisation scheme is proposed to provide visual privacy when human intervention is necessary, such as at telerehabilitation and safety assessment applications. Visualisation levels are dynamically selected based on the previously modelled context. In this way, different levels of protection can be provided, maintaining the necessary intelligibility required for the applications. Furthermore, a case study of a living room, where a top-view camera is installed, is presented. Finally, the performed survey-based evaluation indicates the degree of protection provided by the different visualisation models, as well as the personal privacy preferences and valuations of the users. PMID:26053746
FLUKA Monte Carlo simulations and benchmark measurements for the LHC beam loss monitors
NASA Astrophysics Data System (ADS)
Sarchiapone, L.; Brugger, M.; Dehning, B.; Kramer, D.; Stockner, M.; Vlachoudis, V.
2007-10-01
One of the crucial elements in terms of machine protection for CERN's Large Hadron Collider (LHC) is its beam loss monitoring (BLM) system. On-line loss measurements must prevent the superconducting magnets from quenching and protect the machine components from damages due to unforeseen critical beam losses. In order to ensure the BLM's design quality, in the final design phase of the LHC detailed FLUKA Monte Carlo simulations were performed for the betatron collimation insertion. In addition, benchmark measurements were carried out with LHC type BLMs installed at the CERN-EU high-energy Reference Field facility (CERF). This paper presents results of FLUKA calculations performed for BLMs installed in the collimation region, compares the results of the CERF measurement with FLUKA simulations and evaluates related uncertainties. This, together with the fact that the CERF source spectra at the respective BLM locations are comparable with those at the LHC, allows assessing the sensitivity of the performed LHC design studies.
Real-time synchronization of wireless sensor network by 1-PPS signal
NASA Astrophysics Data System (ADS)
Giammarini, Marco; Pieralisi, Marco; Isidori, Daniela; Concettoni, Enrico; Cristalli, Cristina; Fioravanti, Matteo
2015-05-01
The use of wireless sensor networks with different nodes is desirable in a smart environment, because the network setting up and installation on preexisting structures can be done without a fixed cabled infrastructure. The flexibility of the monitoring system is fundamental where the use of a considerable quantity of cables could compromise the normal exercise, could affect the quality of acquired signal and finally increase the cost of the materials and installation. The network is composed of several intelligent "nodes", which acquires data from different kind of sensors, and then store or transmit them to a central elaboration unit. The synchronization of data acquisition is the core of the real-time wireless sensor network (WSN). In this paper, we present a comparison between different methods proposed by literature for the real-time acquisition in a WSN and finally we present our solution based on 1-Pulse-Per-Second (1-PPS) signal generated by GPS systems. The sensor node developed is a small-embedded system based on ARM microcontroller that manages the acquisition, the timing and the post-processing of the data. The communications between the sensors and the master based on IEEE 802.15.4 protocol and managed by dedicated software. Finally, we present the preliminary results obtained on a 3 floor building simulator with the wireless sensors system developed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-07-01
This document is the final report of the solar energy heating and hot water system installed at the Kansas City Fire Station, Number 24, 2309 Hardesty Street, Kansas City, Missouri. The solar system was designed to provide 47 percent of the space heating, 8800 square feet area and 75 percent of the domestic hot water (DHW) load. The solar system consists of 2808 square feet of Solaron, model 2001, air, flat plate collector subsystem, a concrete box storage subsystem which contains 1428 cubic feet of 1/2 inch diameter pebbles weighing 71 1/2 tons, a DHW preheat tank, blowers, pumps, heatmore » exchangers, air ducting, controls and associated plumbing. Two 120-gallon electric DHW heaters supply domestic hot water which is preheated by the solar system. Auxiliary space heating is provided by three electric heat pumps with electric resistance heaters and four 30-kilowatt electric unit heaters. There are six modes of system operation. This project is part of the Department of Energy PON-1 Solar Demonstration Program with DOE cost sharing $154,282 of the $174,372 solar system cost. The Final Design Review was held March 1977, the system became operational March 1979 and acceptance test was completed in September 1979.« less
Evaluation of the impact of the I-66 active traffic management system : final report.
DOT National Transportation Integrated Search
2016-09-01
Construction of a Virginia Department of Transportation project to install an Active Traffic Management (ATM) system on Interstate-66 (I-66) from U.S. 29 in Centreville to the Capital Beltway (I-495) was completed in September 2015. The project was c...
77 FR 11750 - Idaho: Final Approval of State Underground Storage Tank Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
... defined under Executive Order 12866. I. National Technology Transfer and Advancement Act Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (``NTTAA''), Public Law 104-113, 12(d... the time needed to review instructions; develop, acquire, install, and utilize technology and systems...
76 FR 57659 - Oregon: Final Approval of State Underground Storage Tank Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... defined under Executive Order 12866. I. National Technology Transfer and Advancement Act Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (``NTTAA''), Public Law 104-113, 12(d... instructions; develop, acquire, install, and utilize technology and systems for the purposes of collecting...
7 CFR 1436.13 - Loan installments, delinquency, and acceleration of maturity date.
Code of Federal Regulations, 2014 CFR
2014-01-01
... each 12-month period of each of the partial and final loan disbursements, until the principal plus...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS FARM STORAGE... financial plan submitted by the debtor, CCC may send two subsequent written demands at approximately 30...
7 CFR 1436.13 - Loan installments, delinquency, and acceleration of maturity date.
Code of Federal Regulations, 2011 CFR
2011-01-01
... each 12-month period of each of the partial and final loan disbursements, until the principal plus...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS FARM STORAGE... financial plan submitted by the debtor, CCC may send two subsequent written demands at approximately 30...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
7 CFR 1436.13 - Loan installments, delinquency, and acceleration of maturity date.
Code of Federal Regulations, 2012 CFR
2012-01-01
... each 12-month period of each of the partial and final loan disbursements, until the principal plus...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS FARM STORAGE... financial plan submitted by the debtor, CCC may send two subsequent written demands at approximately 30...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
7 CFR 1436.13 - Loan installments, delinquency, and acceleration of maturity date.
Code of Federal Regulations, 2013 CFR
2013-01-01
... each 12-month period of each of the partial and final loan disbursements, until the principal plus...) COMMODITY CREDIT CORPORATION, DEPARTMENT OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS FARM STORAGE... financial plan submitted by the debtor, CCC may send two subsequent written demands at approximately 30...
40 CFR 265.226 - Monitoring and inspection.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...
Evaluation of rumble stripes on low-volume rural roads in Iowa--phase I : final report, July 2009.
DOT National Transportation Integrated Search
2009-07-01
Single-vehicle run-off-road crashes are the most common crash type on rural two-lane Iowa roads. Rumble strips have been proven effective in mitigating these crashes, but these strips are commonly installed in paved shoulders adjacent to higher-volum...
Microaggressions Trilogy: Part 3. Microaggressions in the Classroom
ERIC Educational Resources Information Center
Berk, Ronald A.
2017-01-01
This article is the final installment in a series of three articles about microaggressions. All of the articles are tailored specifically to help enable faculty developers, provosts and directors of diversity and training, faculty, and administrators to address the most critical issues related to this topic in higher education. Specific responses…
Collaborative Technologies: Three Ways Web Conferencing is Transforming PD
ERIC Educational Resources Information Center
Raths, David
2013-01-01
The first five articles of this series on technologies that enable collaboration, highlighted ways to foster shared learning experiences among students. For this, the final installment, focus is shifted to teachers. States, districts, and groups of teachers are enhancing their collaboration opportunities through synchronous online meetings and…
DOT National Transportation Integrated Search
2017-06-01
Monthly follow-up data confirmed that permanent in roadway installations of the R1-6 gateway treatment led to an : increase in the percentage of drivers yielding to pedestrians at midblock and multilane urban and suburban locations : from 15% to 70% ...
78 FR 6200 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... by installing a placard with the new (reduced) maximum load. We disagree because the customer COS box.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for certain The Boeing... under forward load levels less than the 9 g forward load requirements as defined by certain regulations...
76 FR 66270 - Information Collection Activity; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-26
... collection techniques on other forms of information technology. Comments may be sent to: MaryPat Daskal... form is used for generating plant construction or for the furnishing and installation of major items of..., Construction Inventory This form is used to document the final construction in connection with the closeout of...
The use of hydrated lime as an antistripping additive : addendum to final report.
DOT National Transportation Integrated Search
1990-01-01
The subject report describes a follow-up evaluation of test sections that were installed in 1982 and 1983 and reported on in 1987. Each test section contained three asphalt concretes: (1) with no additive, (2) with hydrated lime, and (3) with one or ...
DOT National Transportation Integrated Search
1995-02-01
The SYLVIA fiberoptic variable message signs (VMS) were installed on the Pacific Highway (I-5) as a part of the "Swift Interchange - Delta Park Interchange" project at milepost 298.47 and at milepost 305.66 in January 1991. Initially, during project ...
Robotics in Industrial Arts. Final Narrative Report for the Exemplary Project.
ERIC Educational Resources Information Center
Ascension Parish School Board, Donaldsonville, LA.
To introduce students to the world of robotics and industrial automation, robotics was introduced to students enrolled in electronics classes in the industrial arts program at St. Amant High School (Louisiana). Three robots, three host microcomputers, and necessary software were purchased. The electronics instructor installed the three robots…
Final Environmental Assessment of Military Service Station Privatization at Five AETC Installations
2013-10-01
distinction (Criterion C); or • Have yielded, or may likely yield, information important in prehistory or history (Criterion D). Resources less than 50...important information in history or prehistory ; thus, it does not meet the requirement of Criterion D. Building 2109 is recommended not eligible for
Indoor Air vs. Indoor Construction: A New Beginning.
ERIC Educational Resources Information Center
Manicone, Santo
2000-01-01
Identifies the steps that can be taken to lessen the impact of indoor air pollution created from indoor renovation projects, including project management tips to help contractors avoid creating unnecessary air pollution. Final comments address air pollution control when installing new furniture, smoking restrictions, occupant relations, and the…
DOT National Transportation Integrated Search
2014-01-01
This report documents the performance of the first Next Generation Concrete Surface (NGCS) built by the : Washington State Department of Transportation (WSDOT). A 1,500 foot test section was installed on the : eastbound lanes of I-82 near Sunnyside, ...
2010-08-01
considered with other activities that require additional artificial night lighting. For instance, the development of the new town of Destiny planned...Mobarkey, M. Barak, A. Hoyzman, and O. Halevy, 2004. Monochromatic Light Stimuli During Embryogenesis Enhances Embryo Development and Posthatch
78 FR 28130 - Airworthiness Directives; Bombardier, Inc. Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-14
... of Transportation (DOT). ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive... was prompted by reports of two in-service incidents where the left main landing gear (MLG) failed to... the right and left MLG uplock assemblies. We are issuing this AD to prevent incorrect installation of...
77 FR 41886 - Airworthiness Directives; Airbus Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... Transportation (DOT). ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for all... the left- and right-hand sides to determine whether a certain part number is installed, and replacement if necessary. We are issuing this AD to prevent non-availability of left- or right-hand off-wing...
Photovoltaic energy system at an Alaskan site. Research report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Das, D.K.; Briggs, R.W.
1991-01-01
The study presented herein provides information gathered over several years on the availability of solar energy and its utilization by a photovoltaic (PV) system installed near Fairbanks (65 N latitude) to demonstrate its feasibility. The study addresses both theoretical and experimental investigations on the potential of solar energy for interior Alaska. Three theoretical approaches are described for calculation solar radiation using American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE), Liu-Jordan, and Collares-Pereira and Rabl models. Computer programs for these theories have been included in the Appendix of the report. The actual test setup of a PV system withmore » all its auxiliary components installed in Haystack (near Fairbanks) and the electrical loads run by it have been described in detail. Four and one-half years of solar radiation measurements and operational experience with the system are documented. Finally, comparisons are made between the measured solar radiation with previous measurements done at the Geophysical Institute of the University of Alaska Fairbanks, and the calculated values from the three models cited earlier. The information from the study should be useful to interested users in interior Alaska and perhaps to other countries of the world located in similar northern latitudes.« less
Stieger, Stefan; Göritz, Anja S; Voracek, Martin
2011-05-01
In Web-based studies, Web browsers are used to display online questionnaires. If an online questionnaire relies on non-standard technologies (e.g., Java applets), it is often necessary to install a particular browser plug-in. This can lead to technically induced dropout because some participants lack the technological know-how or the willingness to install the plug-in. In two thematically identical online studies conducted across two time points in two different participant pools (N = 1,527 and 805), we analyzed whether using a Java applet produces dropout and distortion of demographics in the final sample. Dropout was significantly higher on the Java applet questionnaire page than on the preceding and subsequent questionnaire pages. Age-specific effects were found only in one sample (i.e., dropouts were older), whereas sex-specific effects were found in both samples (i.e., women dropped out more frequently than men on the Java applet page). These results additionally support the recommendation that using additional technologies (e.g., Java applets) can be dangerous in producing a sample that is biased toward both younger and male respondents.
Possibilities For The LAGUNA Projects At The Fréjus Site
NASA Astrophysics Data System (ADS)
Mosca, Luigi
2010-11-01
The present laboratory (LSM) at the Fréjus site and the project of a first extension of it, mainly aimed at the next generation of dark matter and double beta decay experiments, are briefly reviewed. Then the main characteristics of the LAGUNA cooperation and Design Study network are summarized. Seven underground sites in Europe are considered in LAGUNA and are under study as candidates for the installation of Megaton scale detectors using three different techniques: a liquid Argon TPC (GLACIER), a liquid scintillator detector (LENA) and a Water Cerenkov (MEMPHYS), all mainly aimed at investigation of proton decay and properties of neutrinos from SuperNovae and other astrophysical sources as well as from accelerators (Super-beams and/or Beta-beams from CERN). One of the seven sites is located at Fréjus, near the present LSM laboratory, and the results of its feasibility study are presented and discussed. Then the physics potential of a MEMPHYS detector installed in this site are emphasized both for non-accelerator and for neutrino beam based configurations. The MEMPHYNO prototype with its R&D programme is presented. Finally a possible schedule is sketched.
An integrator final exam at the end of the engineering degrees to evaluate the acquired competences
NASA Astrophysics Data System (ADS)
Perdigones, A.; Sánchez, E.; Valiño, V.; Tarquis, A. M.
2010-05-01
In the last decade strong changes in the design of university degrees have occurred in Spain, affecting real competences acquired by graduates. The new degrees often provide students greater freedom in shaping their curriculum which results in many cases in a problem for their training. In engineering degrees of Spain, the final project, that allows to know the integrated skills of the students in engineering subjects, is not compulsory anymore; it can be substituted for other specific types of work that often do not involve skills valued by the companies of the industrial sector. This situation may create doubts about the real competences of the graduates. In the present study, a final exam (voluntary) has been carried out during three years to assess competences in engineering students in the last course of the degree in agricultural engineering (diploma of five years) and agricultural technical engineering (diploma of three years) at the Polytechnic University of Madrid (Spain). They took part 132 students in the years 2006, 2007 and 2008. The exam had a common format, with three parts assessing skills in construction, machinery and electrical installations. The results showed the evolution in the training of students, and the relationship between skills acquired and late differences in the learning process. The most important conclusions were that the attainment levels was lower than expected, but generally consistent with the training received by each group of students. In particular, the low number of hours of subjects in electrical installations in certain groups of students was evident when evaluating the skills acquired. The results indicated that they aim to increase the number of hours in certain subjects and groups of students, if a graduate is to get qualified. The authors recommend an examination similar to the raised, integrator type, in all programs that do not have any overall final assessment in order to conduct a quality control of graduates; this approach has the advantage that graduates may also obtain an additional final certificate with their level of competences towards their future professional work.
ADP Analysis project for the Human Resources Management Division
NASA Technical Reports Server (NTRS)
Tureman, Robert L., Jr.
1993-01-01
The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.
Learning Team Review 2016-0001: Installing Outlets for Programmatic Equipment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dunwoody, John Tyler; Obrey, Kimberly Ann; Bridgewater, Jon S.
The purpose of a Learning Team is to transfer and communicate the information into operational feedback and improvement. We want to pay attention to the small things that go wrong because they are often early warning signals and may provide insight into the health of the whole system. An ESR was placed in the October of 2015 to move/install a number of 120V and 208V outlets in 455-104B to support programmatic furnace needs. Electrical design review was completed for ESR 22217 on February 22, 2016 and a Design Change Form completed describing the modification needed as: demolish 1 existing receptaclemore » and circuit leaving conduit and jbox for use to install new receptacle and 5 new receptacles/circuits are required and one existing receptacle is to be relocated, listed under FSR 149229. The FSR scope of work was written:: Please have the Electricians come out to perform demolition (1ea.), installation (6ea.)& relocation (1ea.) of receptacles / circuits. ESR 22217 & DCF-16-35-0455-1281 is in place for this work. Coordinate final receptacle locations with Laboratory Resident. Contact John Dunwoody or O-MC for this information. WO# 545580-01 was signed on April 20, 2016.: Electricians to perform demolition, installation, & relocation of receptacles / circuits PER attached DCF-16-0455-1281-SK-1.« less
EVA 5 - Installation of the NICMOS cryo-cooler
2002-03-08
STS109-315-005 (8 March 2002) --- Barely visible within the Hubble Space Telescope's heavily shadowed shroud doors, astronauts John M. Grunsfeld (left) and Richard M. Linnehan participate in the final space walk of the STS-109 mission. The crew of the space shuttle Columbia completed the last of its five ambitious space walks early on March 8, 2002, with the successful installation of an experimental cooling system for Hubbles Near-Infrared Camera and Multi-Object Spectrometer (NICMOS). The NICMOS has been dormant since January 1999 when its original coolant ran out. Astronauts Grunsfeld and Linnehan began their third spacewalk of the mission at 2:46 a.m. CST. Linnehan was given a ride on the shuttles robotic arm to the aft shroud doors by astronaut Nancy J. Currie, working from the aft flight deck of Columbia. After the shroud doors were open, Linnehan was moved back to Columbias payload bay to remove the NICMOS cryocooler from its carrier. Grunsfeld and Linnehan then installed the cryocooler inside the aft shroud and connected cables from its Electronics Support Module (ESM). That module was installed on March 7 during a spacewalk by astronauts James H. Newman and Michael J. Massimino.
The potential for PVs in Greek commercial buildings
NASA Astrophysics Data System (ADS)
Samouil, Chris
The photovoltaic sector has been growing explosively, worldwide, for the past few years. At present, grid-connected installations dominate the world market. The photovoltaic technology, types of systems, applications and the market of PVs are presented, placing emphasis on installations regarding the building sector. The main focus of the project is concentrated on Greece. The fact that Greece has favourable natural conditions for the exploitation of solar energy, coupled with the support scheme on phototovoltaics introduced with the new law on renewable energy sources voted in June 2006, makes it very interesting to invest in the Greek PV market. Using a newly built office building in Athens with a roof-top PV installation as a case study, this project looks at the viability of grid-connected systems in the building sector. The annual energy output of the system and CO2 emissions reduction were modelled. Embodied energy, installation cost and annual savings were also considered to determine payback periods. The economic payback period of the system was found to be shorter than its lifetime at 16.2 years, reducing to 9.7 years when grants were included. The carbon payback period was calculated at 6.3 years. A sensitivity analysis on the effect of different factors affecting the viability of the PV installation was carried out. Assuming constant electricity rate increases or a more favourable location for the project the results are more attractive. The same case study in Crete would have a payback period reduced by almost 20% compared to that in Athens. A method to extrapolate the findings for the whole building sector of Attica is proposed as a future research project. As an indication it is found that 60,000 similar to the base case roof-top PV systems can produce around 3.1% of the country's thermally produced electricity and save 0.9% of its CO2 emissions. Finally, the strengths and weeknesses of the new RES law are identified and suggestions are made in order to smoothen PV implementation in Greece.
Smart home in a box: usability study for a large scale self-installation of smart home technologies.
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S; Cook, Diane J; Schmitter-Edgecombe, Maureen
2016-07-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server.
Smart home in a box: usability study for a large scale self-installation of smart home technologies
Hu, Yang; Tilke, Dominique; Adams, Taylor; Crandall, Aaron S.; Schmitter-Edgecombe, Maureen
2017-01-01
This study evaluates the ability of users to self-install a smart home in a box (SHiB) intended for use by a senior population. SHiB is a ubiquitous system, developed by the Washington State University Center for Advanced Studies in Adaptive Systems (CASAS). Participants involved in this study are from the greater Palouse region of Washington State, and there are 13 participants in the study with an average age of 69.23. The SHiB package, which included several different types of components to collect and transmit sensor data, was given to participants to self-install. After installation of the SHiB, the participants were visited by researchers for a check of the installation. The researchers evaluated how well the sensors were installed and asked the resident questions about the installation process to help improve the SHiB design. The results indicate strengths and weaknesses of the SHiB design. Indoor motion tracking sensors are installed with high success rate, low installation success rate was found for door sensors and setting up the Internet server. PMID:28936390
Latest technologies on ultrasonic cleaning
NASA Astrophysics Data System (ADS)
Hofstetter, Hans U.
2007-05-01
UCM-AG manufactures Ultrasonic Cleaning Machines for highest quality requirements. The company has the know-how for cleaning and supplies cleaning systems together with the cleaning process. With a UCM of Switzerland Cleaning System, the customer gets the system itself, the cleaning process with a guarantee for the specified result but also all auxiliary equipment needed for perfect results. Therefore UCM also supplies fixtures, linkage to existing automated fabrication facilities water treatment plants etc. Thus the UCM customer gets a turnkey installation - ready to operate and including know-how. UCM of Switzerland will describe the latest technology in ultrasonic precision cleaning on the example of a recent and sophisticated installation. The installation consists of three interlinked cleaning systems which operate completely automated. The 1st system is designed for pre-cleaning to remove waxes, pitch and protection lacquers with environmentally friendly solvents which are non hazardous to the health of the operators. The 2nd system cleans the parts prior to inspection and operates with neutral or slightly alkaline detergents. The 3rd system is designed for final cleaning prior to vacuum coating and perfect results are required. It combines cleaning tanks and DI-Water rinse with lift out and vacuum dryer. The installation combines the latest technologies in ultrasonic cleaning for precision optical components. The system employs multi frequency immersed ultrasonic transducers and special rinsing technologies The complete installation will be explained in detail; the concept in its whole, the lay out, the particular setup of each cleaning system etc. will be shown and explained together with construction particulars of the complete installation.
El Toro Library Solar Heating and Cooling Demonstration Project. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less
2013-03-08
CAPE CANAVERAL, Fla. – At Kennedy Space Center's Shuttle Landing Facility, a granite plaque marks the spot where space shuttle Atlantis' nose gear came to a stop at the conclusion of STS-135, the final flight of the Space Shuttle Program. Permanent reminders indicate where on the runway the orbiters Discovery, Endeavour and Atlantis stopped rolling as each finished its last mission in 2011. In addition to the granite markers, which are installed alongside the runway, there are etchings in the grooved concrete along the runway's centerline to mark each wheelstop. The etchings and markers were created and installed by local artist Chad Stout of C Spray Glass Blasting in Cocoa, Fla. Photo credit: NASA/Tim Jacobs
2013-03-08
CAPE CANAVERAL, Fla. – At Kennedy Space Center's Shuttle Landing Facility, a granite plaque marks the spot where space shuttle Discovery's nose gear came to a stop at the conclusion of STS-133, the final flight of the Space Shuttle Program. Permanent reminders indicate where on the runway the orbiters Discovery, Endeavour and Atlantis stopped rolling as each finished its last mission in 2011. In addition to the granite markers, which are installed alongside the runway, there are etchings in the grooved concrete along the runway's centerline to mark each wheelstop. The etchings and markers were created and installed by local artist Chad Stout of C Spray Glass Blasting in Cocoa, Fla. Photo credit: NASA/Tim Jacobs
2013-03-08
CAPE CANAVERAL, Fla. – At Kennedy Space Center's Shuttle Landing Facility, a granite plaque marks the spot where space shuttle Endeavour's nose gear came to a stop at the conclusion of STS-134, the final flight of the Space Shuttle Program. Permanent reminders indicate where on the runway the orbiters Discovery, Endeavour and Atlantis stopped rolling as each finished its last mission in 2011. In addition to the granite markers, which are installed alongside the runway, there are etchings in the grooved concrete along the runway's centerline to mark each wheelstop. The etchings and markers were created and installed by local artist Chad Stout of C Spray Glass Blasting in Cocoa, Fla. Photo credit: NASA/Tim Jacobs
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009342 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009315 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009312 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009317 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009329 (27 July 2009) --- Astronauts Christopher Cassidy and Tom Marshburn (partially out of frame at left), both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009323 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009303 (27 July 2009) --- Astronaut Tom Marshburn, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and astronaut Christopher Cassidy (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009363 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009372 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
ISS020-E-025085 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of ?get ahead? tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009248 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
2009-07-27
S127-E-009347 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
Cassidy and Marshburn during EVA-5
2009-07-27
S127-E-009371 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.
SNS Central Helium Liquefier spare Carbon Bed installation and commissioning
NASA Astrophysics Data System (ADS)
DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.
2017-12-01
The Spallation Neutron Source (SNS) Central Helium Liquefier (CHL) at Oak Ridge National Laboratory (ORNL) has been without major operations downtime since operations were started back in 2006. This system utilizes a vessel filled with activated carbon as the final major component to remove oil vapor from the compressed helium circuit prior to insertion into the system’s cryogenic cold box. The need for a spare carbon bed at SNS due to the variability of carbon media lifetime calculation to adsorption efficiency will be discussed. The fabrication, installation and commissioning of this spare carbon vessel will be presented. The novel plan for connecting the spare carbon vessel piping to the existing infrastructure will be presented.
Review and evaluation of automotive fuel conservation technologies. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siegel, H.M.; Schwarz, R.; Andon, J.
1981-12-01
To support the Office of Research and Development of the National Highway Traffic Safety Administration with focused studies in areas affecting automotive fuel economy and related safety issues, a series of in-depth studies were carried out: Fuel Consumption Estimates of Stratified Charge Rotary Engines Installed in Five Vehicles; Oldsmobile Omega X Body Baseline Weight Data; GM X Body Material Substitution Weight Reduction/Cost Effectiveness Study; Calspan RSV Restraint System Cost Study; FMVSS No. 208 Extension to Light Trucks, Vans, and MPV's - Cost Lead Time Study; Multipiece Rims for Trucks, Buses, and Trailers; Identifying Design Changes, Cost Impacts and Manufacturing Leadmore » Times to Upgrade FMVSS 114 for Passenger Cars, Trucks, and MPV's; Ford Escort GL Baseline Weight Data.« less
Practical demonstration of heat pumps for utilization of animal-generated heat
NASA Astrophysics Data System (ADS)
Amberg, H. U.
1980-09-01
Airconditioning of pigpens to eliminate effects of temperature extremes is reported. A stall air conditioner was installed as heat pump in a pigpen for final fattening. The heat, recovered from the exhaust air, is supplied to the outside air so that heated fresh air is blown into the stall. The test was accomplished on a farm with intensive pig breeding with 120 preliminary fattening places and 240 final fattening places. The stall air conditioner offers the possibility to attenuate the extreme temperature variations during the year.
Pre-flight views of orbiter Endeavour on way to launch pad for STS-77
1996-05-01
S96-07957 (16 April 1996) --- A road sign points to Launch Pad 39B, the final earthly destination for the Space Shuttle Endeavour and its final stepping stone into space. Endeavour began the slow journey from the Vehicle Assembly Building (VAB) at about 10:00a.m., April 16, 1996, perched atop the Mobile Launcher Platform and carried by the Crawler-Transporter. Upcoming activities at the pad to prepare Endeavour for flight on STS-77 include installation of the payloads in the Orbiter?s payload bay.
STS-108 Mission Specialist Daniel M. Tani final suit checkout
NASA Technical Reports Server (NTRS)
2001-01-01
STS-108 Mission Specialist Daniel M. Tani final suit checkout KSC-01PD-1717 KENNEDY SPACE CENTER, Fla. - STS-108 Mission Specialist Daniel M. Tani waves as he undergoes final suit check before launch on Nov. 29. Top priorities for the STS-108 (UF-1) mission of Endeavour are rotation of the International Space Station Expedition Three and Expedition Four crews; bringing water, equipment and supplies to the station in the Multi-Purpose Logistics Module Raffaello; and completion of robotics tasks and a spacewalk to install thermal blankets over two pieces of equipment at the bases of the Space Station's solar wings. Liftoff is scheduled for 7:41 p.m. EST.
STS-108 Mission Specialist Linda A. Godwin final suit checkout
NASA Technical Reports Server (NTRS)
2001-01-01
STS-108 Mission Specialist Linda A. Godwin final suit checkout KSC-01PD-1720 KENNEDY SPACE CENTER, Fla. -- STS-108 Mission Specialist Linda A. Godwin undergoes final suit check before launch on mission STS-108 Nov. 29. Top priorities for the STS-108 (UF-1) mission of Endeavour are rotation of the International Space Station Expedition Three and Expedition Four crews; bringing water, equipment and supplies to the station in the Multi-Purpose Logistics Module Raffaello; and completion of robotics tasks and a spacewalk to install thermal blankets over two pieces of equipment at the bases of the Space Station's solar wings. Liftoff is scheduled for 7:41 p.m. EST.
76 FR 21775 - Notice of Issuance of Final Determination Concerning Certain Office Workstations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
.... Sec. 134.1(b)), defines ``country of origin'' as: [T]he country of manufacture, production, or growth... engineered and designed the office workstations wholly within the U.S. The assembly and installation of the... customer to design a workstation architecture best suited to the specific office space. Once a design...
7 CFR 762.124 - Interest rates, terms, charges, and fees.
Code of Federal Regulations, 2013 CFR
2013-01-01
... economic reverses. (2) The final maturity date for each loan cannot exceed 7 years from the date of the... farm, or recover from a disaster or an economical reversal. (2) Loans with balloon installments must... payment comes due based on the expected financial condition of the operation, the depreciated value of the...
7 CFR 762.124 - Interest rates, terms, charges, and fees.
Code of Federal Regulations, 2011 CFR
2011-01-01
... economic reverses. (2) The final maturity date for each loan cannot exceed 7 years from the date of the... farm, or recover from a disaster or an economical reversal. (2) Loans with balloon installments must... payment comes due based on the expected financial condition of the operation, the depreciated value of the...
7 CFR 762.124 - Interest rates, terms, charges, and fees.
Code of Federal Regulations, 2012 CFR
2012-01-01
... economic reverses. (2) The final maturity date for each loan cannot exceed 7 years from the date of the... farm, or recover from a disaster or an economical reversal. (2) Loans with balloon installments must... payment comes due based on the expected financial condition of the operation, the depreciated value of the...
Mini-Computers and the Building Trades: A Guide for Teachers of Vocational Education. Final Report.
ERIC Educational Resources Information Center
Asplen, Donald; And Others
These training materials are designed to help vocational education teachers introduce students to the utilization and installation of mini- and microcomputers in residential and small business buildings. It consists of two chapters. Chapter 1 contains general materials, designed to promote awareness, and chapter 2 contains materials which are…
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2011 CFR
2011-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2010 CFR
2010-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
40 CFR 258.60 - Closure criteria.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...
Commissioning School Construction Projects. IssueTrak: A CEFPI Brief on Educational Facility Issues
ERIC Educational Resources Information Center
Keithly, Peter
2005-01-01
This "IssueTrak" discusses an increasing interest in verifying the installation and performance of building systems prior to delivery and final acceptance by the building owner. This interest in quality assurance has spawned a new and distinct professional construction discipline referred to as building commissioning. The principal objective of…
78 FR 73239 - Small Generator Interconnection Agreements and Procedures
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-05
... distributed resources.\\35\\ Public Interest Organizations go on to state that: \\29\\ See, e.g., American Wind... Society and Wind on the Wires are referred to collectively as Public Interest Organizations in this Final...\\ Similarly, installed wind generation with a capacity of 20 MW or less has increased in the contiguous United...
Evaluation of the guard rail energy absorbing terminal (G-R-E-A-T) impact attenuator : final report.
DOT National Transportation Integrated Search
1982-09-01
This short report evaluates as many aspects of the Guard Rail Energy Absorbing Terminal (G-R-E-A-T), a vehicle attenuator, as possible. The system was first installed on a particular bridge in September 1979 and was evaluated for three years. No impa...
ERIC Educational Resources Information Center
Schlichter, Carol
1978-01-01
The final installment of a series of articles on the "Mushroom Place" learning center program, which involves creative thinking activities for young, gifted students, describes "Doing It the Hard Way," a performance task which involves the actual construction of objects from a selected set of materials in the absence of the usual project tools.…
Costs and description of a solar-energy system--Austin, Texas
NASA Technical Reports Server (NTRS)
1981-01-01
Heating and cooling system uses Fresnel lens concentrating collectors. Major system components are 36 collectors, 1,500 gallon thermal storage tank, absorption cooler, cooling tower, heating coil, pumps, heat exchanger, and backup heating and air conditioning. Final report includes detailed breakdown of component and installation costs for seven project subsystems.
32 CFR 174.11 - Leasing of real property to non-Federal entities.
Code of Federal Regulations, 2012 CFR
2012-07-01
.... 174.11 Section 174.11 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE... the Secretary determines that: (1) A public interest will be served as a result of the lease; and, (2...) Pending final disposition of an installation, the Secretary concerned may grant interim leases which are...
Code of Federal Regulations, 2010 CFR
2010-10-01
... premises wiring that serves fewer than four subscriber access lines. 68.214 Section 68.214... other than “fully protected” premises wiring that serves fewer than four subscriber access lines. Operations associated with the installation, connection, reconfiguration and removal (other than final...
1990-08-01
transformer core, such as loose or fractured core laminations . A sound level meter with an A- weighting frequency network was used for the...loaded on flatbed trucks as shown in Figure 2 and permanently installed at various sites throughout the Pearl Harbor complex. Figure 3 shows the final
Solar-Heated and Cooled Office Building--Columbus, Ohio
NASA Technical Reports Server (NTRS)
1982-01-01
Final report documents solar-energy system installed in office building to provide space heating, space cooling and domestic hot water. Collectors mounted on roof track Sun and concentrate rays on fluid-circulating tubes. Collected energy is distributed to hot-water-fired absorption chiller and space-heating and domestic-hot-water preheating systems.
76 FR 63188 - Hawaii State Plan; Change in Level of Federal Enforcement: Military Installations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... Hawaii, Department of Labor and Industrial Relations, requested in a November 15, 2010 memorandum which... INFORMATION CONTACT: Press inquiries: Frank Meilinger, Office of Communications, OSHA, U.S. Department of... Department of Labor and Industrial Relations. On April 30, 1984, OSHA awarded final approval to the Hawaii...
77 FR 52201 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... with new parts and tubing on the left and right engines; and installing Aero-Engine database (AEDB...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0.... ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for certain The Boeing...
Solar Mosaic Inc. Mosaic Home Solar Loan SunShot 9 Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, Colin James
The 6686 Mosaic SunShot award has helped Solar Mosaic Inc to progress from an early stage startup focused on commercial crowdfunding to a leading multi-state residential solar lender. The software platform is now used by the majority of the nation's top solar installers and offers a variety of simple home solar loans. Mosaic is has originated approximately $1Bil in solar loans to date to put solar on over 35k rooftops. The company now lends to homeowners with a wide range of credit scores across multiple states and mitigates boundaries preventing them from profiting from ownership of a home solar system.more » The project included milestones in 5 main categories: 1. Lending to homeowners outside of CA 2. Lending to homeowners with FICO scores under 700 3. Packaging O&M with the home solar loan 4. Allowing residential installers to process home solar loans via API 5. Lowering customer acquisition costs below $1500 This report includes a detailed review of the final results achieved and key findings.« less
STS-112 Crew Interviews: Sellers
NASA Technical Reports Server (NTRS)
2002-01-01
Piers Sellers is an Astronaut from Crowborough, UK. His Bachelor of Science degree is in Ecological science from Scotland's University of Edinburgh and his doctorate is in biometeorology from Leeds University in the UK. After two years of intense training, Sellers's first assignment as a Mission Specialist is on Flight 111 STS-112. The goal of this flight is to continue building the International Space Station. Sellers, accompanied by five astronauts, will install the S1 truss of the space station which will take three EVA's, or Extra Vehicular Activities to complete. In EVA 1, the highest priority, the S1 truss will be attached to the space station. EVA 2, the electrical work, will set up the radiator and cooling equipment for the station. EVA 3, the final process of the flight, will prepare the station for the next mission. The primary reason for installing the truss is to change the center of gravity of the station so when the next truss is installed, it will be at a symmetrical point.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kirby, M.J.; Kramer, S.R.; Pittard, G.T.
Jason Consultants International, Inc., under the sponsorship of the Gas Research Institute (GRI), has developed guidelines, procedures and software, which are described in this paper, for the installation of polyethylene gas pipe using guided horizontal drilling. Jason was aided in this development by two key subcontractors; Maurer Engineering who wrote the software and NICOR Technologies who reviewed the software and guidelines from a utility perspective. This program resulted in the development of commerically viable software for utilities, contractors, engineering firms, and others involved with the installation of pipes using guided horizontal drilling. The software is an interactive design tool thatmore » allows the user to enter ground elevation data, alignment information and pipe data. The software aides the engineer in designing a drill path and provides plan and profile views along with tabular data for pipe depth and surface profile. Finally, the software calculates installation loads and pipe stresses, compares these values against pipe manufacturer`s recommendations, and provides this information graphically and in tabular form. 5 refs., 18 figs., 2 tabs.« less
Park, Young-Jin; Cho, Sung-Am
2010-06-01
To evaluate the survival rate of implants placed in the maxillary tuberosity region using the fixed prosthesis in partially edentulous cases. Of implant-treated patients who visited Kyung Pook National University Hospital, 7 partially edentulous patients (2 male and 5 female; mean age, 52.3 years; range, approximately 43 to 65) were selected according to the following criteria: 1) less than 3-mm thickness alveolar bone reaming at the first molar area and 2) 1 to 2 fixture premolars, with the additional implant at the maxillary tuberosity region. For the control group, patients who had nontuberosity areas were selected. After 1 to 7 years, marginal bone level, fixture mobility, and radiolucency of tuberosity fixtures of the fixed prostheses were evaluated by digital panorama (Starpacs, Infinitt, Seoul, Korea). None of the fixtures of the tuberosity-installed implants for 1 to 7 years failed. The marginal bone level around the implants of the maxillary tuberosity 1 to 6 years (average 3.4 years) after the final prostheses was approximately 0.6 to 1.3 mm, with an average of 0.94 mm. The fixture installation at the maxillary tuberosity using the unilateral partially edentulous implant-fixed prosthesis would be a clinically acceptable treatment module. 2010 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.
Development of guided horizontal boring tools. Final report, June 1984-March 1991
DOE Office of Scientific and Technical Information (OSTI.GOV)
McDonald, W.J.; Herben, W.C.; Pittard, G.T.
Maurer Engineering Inc. (MEI), under a contract with the Gas Research Institute (GRI), has led a team of research and manufacturing companies with the goal of developing a guided boring tool for installing gas distribution piping. Studies indicated guided horizontal boring systems can provide gas utilities with a more effective and economical method for installing pipe than conventional techniques with a potential cost savings of at least 15% to 50%. A comprehensive state of technology review of horizontal boring tools identified concepts appropriate to being directionally controlled. Development of a universal system was found impractical because the requirements for shortmore » and extended range systems are significantly different. Concepts for steering and tracking were evaluated through lab and field experiments which progressed from proof of concept tests to cooperative field tests with gas utilities at the various stages of system development. The systems were brought to commercial status with needed modifications and the technology transferred to licensees who would market the systems. The program resulted in the development and commercialization of five distinct guided boring system. Pipe can now be installed more rapidly over longer distances with a minimal amount of excavation required for launching and retrieval. This means increased work crew productivity, reduced disturbance to landscaping and environmentally sensitive areas, and reduced traffic disruption and public inconvenience.« less
NASA Astrophysics Data System (ADS)
Kato, Takeyoshi; Sugimoto, Hiroyuki; Suzuoki, Yasuo
We established a procedure for estimating regional electricity demand and regional potential capacity of distributed generators (DGs) by using a grid square statistics data set. A photovoltaic power system (PV system) for residential use and a co-generation system (CGS) for both residential and commercial use were taken into account. As an example, the result regarding Aichi prefecture was presented in this paper. The statistical data of the number of households by family-type and the number of employees by business category for about 4000 grid-square with 1km × 1km area was used to estimate the floor space or the electricity demand distribution. The rooftop area available for installing PV systems was also estimated with the grid-square statistics data set. Considering the relation between a capacity of existing CGS and a scale-index of building where CGS is installed, the potential capacity of CGS was estimated for three business categories, i.e. hotel, hospital, store. In some regions, the potential capacity of PV systems was estimated to be about 10,000kW/km2, which corresponds to the density of the existing area with intensive installation of PV systems. Finally, we discussed the ratio of regional potential capacity of DGs to regional maximum electricity demand for deducing the appropriate capacity of DGs in the model of future electricity distribution system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Menes, F.; Dirian, G.
1962-12-14
The results obtained up to June 25, 1962, on the separation of Ca isotopes by electromigration in fused salts have been reported in seven progress reports. The data given in these reports are summarized. Later study investigated the improvement of the diaphragm performance using nonclassical methods, preparation of an experiment confirming the performances of the high capacity U tube'' apparatus, and preparation of an installation designed for perfecting the dropping tube'' device. Only preliminary results on these studes are available. (J.S.R.)
Comparative performance tests on the Mod-2, 2.5-mW wind turbine with and without vortex generators
NASA Technical Reports Server (NTRS)
Miller, G. E.
1995-01-01
A test program was conducted on the third Mod-2 unit at Goldendale, Washington, to systematically study the effect of vortex generators (VG's) on power performance. The subject unit was first tested without VG's to obtain baseline data. Vortex generators were then installed on the mid-blade assemblies, and the resulting 70% VG configuration was tested. Finally, vortex generators were mounted on the tip assemblies, and data was recorded for the 100% VG configuration. This test program and its results are discussed in this paper. The development of vortex generators is also presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
NASA Astrophysics Data System (ADS)
Wong, Cat S. M.; Snider, L. A.; Lo, Edward W. C.; Chung, T. S.
Switching of induction motors with vacuum circuit breakers continues to be a concern. In this paper the influence on statistical overvoltages of the stochastic characteristics of vacuum circuit breakers, high frequency models of motors and transformers, and network characteristics, including cable lengths and network topology are evaluated and a general view of the overvoltages phenomena is presented. Finally, a real case study on the statistical voltage levels and risk-of-failure resulting from switching of a vacuum circuit breaker in an industrial installation in Hong Kong is presented.
NASA Astrophysics Data System (ADS)
Mackay, D. S.; Ewers, B. E.; Sperry, J. S.; Frank, J. M.; Reed, D. E.
2014-12-01
Mediterranean water limited ecosystems are characterized by an heterogeneous spatial distribution of different plant functional types (PFT), such as grass and trees, competing for water use. Typically, during the dry summers, these ecosystems are characterized by a simple dual PFTs system with strong-resistant woody vegetation and bare soil, since grass died. The coupled use of sap flow measurements and eddy covariance technique is essential to estimate Evapotransiration (ET) in an heterogeneous ecosystem. An eddy covariance - micrometeorological tower has been installed since 2003 and 33 thermo-dissipation probes based on the Granier technique have installed at the Orroli site in Sardinia (Italy). The site landscape is a mixture of Mediterranean patchy vegetation types: wild olives, different shrubs and herbaceous species, which died during the summer. The sensors have been installed at the Orroli site into 15 wild olives clumps with different characteristics in terms of tree size, exposition to wind and solar radiation and soil depth. A network of 30 soil moisture sensors has also been installed for monitoring soil moisture spatial and temporal dynamics and their correlation with trees. Sap flow measurements show the significantly impacts on ET of soil moisture, radiation, vapor pressure deficit (VPD) and interestingly of tree position into the clump, showing double rates for the trees inside the wild olive clumps. The sap flow sensor outputs are analyzed for estimating innovative allometric relationships between sapwood area, diameter, canopy cover area, which are needed for the correct upscale of the local tree measurements to the site plot larger scale. Finally using an innovative scaling procedure, the sap-flow transpiration at field scale have been compared to the eddy covariance ET, showing the approximation of the eddy covariance technique. Finally the impact of environmental factors on ET for different soil depth and tree position is demonstrated.
NASA Astrophysics Data System (ADS)
Montaldo, N.; Curreli, M.; Corona, R.; Oren, R.
2015-12-01
Mediterranean water limited ecosystems are characterized by an heterogeneous spatial distribution of different plant functional types (PFT), such as grass and trees, competing for water use. Typically, during the dry summers, these ecosystems are characterized by a simple dual PFTs system with strong-resistant woody vegetation and bare soil, since grass died. The coupled use of sap flow measurements and eddy covariance technique is essential to estimate Evapotransiration (ET) in an heterogeneous ecosystem. An eddy covariance - micrometeorological tower has been installed since 2003 and 33 thermo-dissipation probes based on the Granier technique have installed at the Orroli site in Sardinia (Italy). The site landscape is a mixture of Mediterranean patchy vegetation types: wild olives, different shrubs and herbaceous species, which died during the summer. The sensors have been installed at the Orroli site into 15 wild olives clumps with different characteristics in terms of tree size, exposition to wind and solar radiation and soil depth. A network of 30 soil moisture sensors has also been installed for monitoring soil moisture spatial and temporal dynamics and their correlation with trees. Sap flow measurements show the significantly impacts on ET of soil moisture, radiation, vapor pressure deficit (VPD) and interestingly of tree position into the clump, showing double rates for the trees inside the wild olive clumps. The sap flow sensor outputs are analyzed for estimating innovative allometric relationships between sapwood area, diameter, canopy cover area, which are needed for the correct upscale of the local tree measurements to the site plot larger scale. Finally using an innovative scaling procedure, the sap-flow transpiration at field scale have been compared to the eddy covariance ET, showing the approximation of the eddy covariance technique. Finally the impact of environmental factors on ET for different soil depth and tree position is demonstrated.
Electromagnetic diagnostic system for the Keda Torus eXperiment
NASA Astrophysics Data System (ADS)
Tu, Cui; Liu, Adi; Li, Zichao; Tan, Mingsheng; Luo, Bing; You, Wei; Li, Chenguang; Bai, Wei; Fu, Chenshuo; Huang, Fangcheng; Xiao, Bingjia; Shen, Biao; Shi, Tonghui; Chen, Dalong; Mao, Wenzhe; Li, Hong; Xie, Jinglin; Lan, Tao; Ding, Weixing; Xiao, Chijin; Liu, Wandong
2017-09-01
A system for electromagnetic measurements was designed and installed on the Keda Torus eXperiment (KTX) reversed field pinch device last year. Although the unique double-C structure of the KTX, which allows the machine to be opened easily without disassembling the poloidal field windings, makes the convenient replacement and modification of the internal inductive coils possible, it can present difficulties in the design of flux coils and magnetic probes at the two vertical gaps. Moreover, the KTX has a composite shell consisting of a 6 mm stainless steel vacuum chamber and a 1.5 mm copper shell, which results in limited space for the installation of saddle sensors. Therefore, the double-C structure and composite shell should be considered, especially during the design and installation of the electromagnetic diagnostic system (EDS). The inner surface of the vacuum vessel includes two types of probes. One type is for the measurement of the global plasma parameters, and the other type is for studying the local behavior of the plasma and operating the new saddle coils. In addition, the probes on the outer surface of the composite shell are used for measurements of eddy currents. Finally, saddle sensors for radial field measurements for feedback control were installed between the conducting shell and the vacuum vessel. The entire system includes approximately 1100 magnetic probes, 14 flux coils, 4 ×26 ×2 saddle sensors, and 16 Rogowski coils. Considering the large number of probes and limited space available in the vacuum vessel, the miniaturization of the probes and optimization of the probe distribution are necessary. In addition, accurate calibration and careful mounting of the probes are also required. The frequency response of the designed magnetic probes is up to 200 kHz, and the resolution is 1 G. The EDS, being spherical and of high precision, is one of the most basic and effective diagnostic tools of the KTX and meets the demands imposed by requirements on basic machine operating information and future studies.
An Analytical Study for Subsonic Oblique Wing Transport Concept
NASA Technical Reports Server (NTRS)
Bradley, E. S.; Honrath, J.; Tomlin, K. H.; Swift, G.; Shumpert, P.; Warnock, W.
1976-01-01
The oblique wing concept has been investigated for subsonic transport application for a cruise Mach number of 0.95. Three different mission applications were considered and the concept analyzed against the selected mission requirements. Configuration studies determined the best area of applicability to be a commercial passenger transport mission. The critical parameter for the oblique wing concept was found to be aspect ratio which was limited to a value of 6.0 due to aeroelastic divergence. Comparison of the concept final configuration was made with fixed winged configurations designed to cruise at Mach 0.85 and 0.95. The crossover Mach number for the oblique wing concept was found to be Mach 0.91 for takeoff gross weight and direct operating cost. Benefits include reduced takeoff distance, installed thrust and mission block fuel and improved community noise characteristics. The variable geometry feature enables the final configuration to increase range by 10% at Mach 0.712 and to increase endurance by as much as 44%.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-11-11
In May 1994, Affiliated Engineers SE, Inc. (AESE) was retained by the Mobile District US Army Corps of Engineers to perform a Limited Energy Study for Milan Army Ammunition Plant, Tennessee. The field survey of existing conditions was completed in June 1994. The results of this field survey were subsequently tabulated and used to generate single line building drawings on Autocad. Several alternative lighting models were examined to determine if a more efficient lighting system could be installed that would produce the same or better lumen levels at these facilities while reducing the buildings` electrical lighting energy consumption. This reportmore » summarizes the results obtained from this field investigation and the analysis of various alternative Energy Conservation Opportunities (ECO`s). To develop the field data into various alternative ECO concepts or models, we utilized an `Excel` spreadsheet to tabulate and compare energy consumption, light output, installation and operating costs for various ECO`s at these buildings. These ECO`s were then analyzed for suitability for the Energy Conservation lnvestment Program (ECIP) using the govemmenrs software package called Life Cycle Cost in Design (LCCID).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-11-11
In May 1994, Affiliated Engineers SE, Inc. (AESE) was retained by the Mobile District U.S. Army Corps of Engineers to perform a Limited Energy Study for Milan Army Ammunition Plant, Tennessee. The field survey of existing conditions was completed in June 1994. The results of this field survey were subsequently tabulated and used to generate single line building drawings on Autocad. Several alternative lighting models were examined to determine if a more efficient lighting system could be installed that would produce the same or better lumen levels at these facilities while reducing the buildings` electrical lighting energy consumption. This reportmore » summarizes the results obtained from this field investigation and the analysis of various alternative Energy Conservation Opportunities (ECO`s). To develop the field data into various alternative ECO concepts or models, we utilized an `Excel` spreadsheet to tabulate and compare energy consumption, light output, installation and operating costs for various ECO`s at these buildings. These ECO`s were then analyzed for suitability for the Energy Conservation Investment Program (ECIP) using the government`s software package called Life Cycle Cost in Design (LCCID).« less
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kraybill, R.L.; Smart, G.R.; Bopp, F.
1985-09-04
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less
Design of a seismo-acoustic station for Antarctica.
Contrafatto, Danilo; Fasone, Rosario; Ferro, Angelo; Larocca, Graziano; Laudani, Giuseppe; Rapisarda, Salvatore; Scuderi, Luciano; Zuccarello, Luciano; Privitera, Eugenio; Cannata, Andrea
2018-04-01
In recent years, seismological studies in Antarctica have contributed plenty of new knowledge in many fields of earth science. Moreover, acoustic investigations are now also considered a powerful tool that provides insights for many different objectives, such as analyses of regional climate-related changes and studies of volcanic degassing and explosive activities. However, installation and maintenance of scientific instrumentation in Antarctica can be really challenging. Indeed, the instruments have to face the most extreme climate on the planet. They must be tolerant of very low temperatures and robust enough to survive strong winds. Moreover, one of the most critical tasks is powering a remote system year-round at polar latitudes. In this work, we present a novel seismo-acoustic station designed to work reliably in polar regions. To enable year-round seismo-acoustic data collection in such a remote, extreme environment, a hybrid powering system is used, integrating solar panels, a wind generator, and batteries. A power management system was specifically developed to either charge the battery bank or divert energy surplus to warm the enclosure or release the excess energy to the outside environment. Finally, due to the prohibitive environmental conditions at most Antarctic installation sites, the station was designed to be deployed quickly.
Design of a seismo-acoustic station for Antarctica
NASA Astrophysics Data System (ADS)
Contrafatto, Danilo; Fasone, Rosario; Ferro, Angelo; Larocca, Graziano; Laudani, Giuseppe; Rapisarda, Salvatore; Scuderi, Luciano; Zuccarello, Luciano; Privitera, Eugenio; Cannata, Andrea
2018-04-01
In recent years, seismological studies in Antarctica have contributed plenty of new knowledge in many fields of earth science. Moreover, acoustic investigations are now also considered a powerful tool that provides insights for many different objectives, such as analyses of regional climate-related changes and studies of volcanic degassing and explosive activities. However, installation and maintenance of scientific instrumentation in Antarctica can be really challenging. Indeed, the instruments have to face the most extreme climate on the planet. They must be tolerant of very low temperatures and robust enough to survive strong winds. Moreover, one of the most critical tasks is powering a remote system year-round at polar latitudes. In this work, we present a novel seismo-acoustic station designed to work reliably in polar regions. To enable year-round seismo-acoustic data collection in such a remote, extreme environment, a hybrid powering system is used, integrating solar panels, a wind generator, and batteries. A power management system was specifically developed to either charge the battery bank or divert energy surplus to warm the enclosure or release the excess energy to the outside environment. Finally, due to the prohibitive environmental conditions at most Antarctic installation sites, the station was designed to be deployed quickly.
Electrostatic Evaluation of the SRB Velostat(Trademark) Pads
NASA Technical Reports Server (NTRS)
Buhler, Charles R.; Calle, Carlos I.
2007-01-01
During RSRM Grain inspection, pads constructed of Velostat are grounded and installed in the RSRM bore enabling inspectors to move throughout the bore during the inspection. Velostat pads are installed by grounding the first pad installed and subsequent pads are installed overlapping the previously installed pad maintaining a conductive path to facility ground. Pads are removed upon completion of the inspection in a reverse fashion. As the pads are removed scanning of propellant surfaces is performed per OMRS. During PPICI Audit of B5308.006 (Forward Segment Grain Inspection) in October 07 one audit finding noted that electrostatic scanning of propellant surfaces was being performed during removal of conductive pads following grain inspection. ATK does not perform electrostatic scanning of propellant surfaces during pad removal following final inspection at the plant. The integrated team consisting of NASA SE, USA SE, USA QE, ATK LSS, ATK Systems Safety and ATK DE concurred that electrostatic scanning of propellant surfaces was unnecessary as the conductive pads are grounded. Additional time spent in bore performing scanning presents itself as additional risk. Technicians reported that they have never seen any voltage readings while scanning propellant surfaces during pad removal. USA Systems engineering has written KB 17530 in response to the finding which will delete the requirement (item 2 B47GEN.ll0) to scan propellant surfaces during pad removal. As a result of an E3 panel discussion on December 13, 2007, it was decided that verification of the electrical grounding of the Velostat pads be verified.
The Evolving Market Structure of the U.S. Residential Solar PV Installation Industry, 2000-2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
OShaughnessy, Eric J.
This study uses data on over 900,000 solar PV installations to summarize the evolving market structure of the U.S. residential solar PV installation industry. Over 8,000 companies have installed residential PV systems in the United States. The vast majority of these installers are small local companies. At the same time, a subset of national-scale high-volume PV installation companies hold high market shares. This study examines the factors behind these trends in market concentration, including the role of customer financing options.
Experimental results on multi-nucleonic K- absorptions in light nuclei
NASA Astrophysics Data System (ADS)
Vázquez Doce, O.; Cargnelli, M.; Curceanu, C.; Del Grande, R.; Fabbietti, L.; Marton, J.; Piscicchia, K.; Scordo, A.; Sirghi, D.; Tucakovic, I.; Wycech, S.; Zmeskal, J.; Anastasi, A.; Curciarello, F.; Czerwinski, E.; Krzemien, W.; Mandaglio, G.; Martini, M.; Moskal, P.; Patera, V.; Perez del Rio, E.; Silarski, M.
2017-03-01
The AMADEUS collaboration studied the K- absorptions at low momentum in light nuclei leading to Σ0p final state. Those events were recorded by the KLOE detector, used as an active target, installed in the the DAΦNE collider. The results show that it is possible to isolate the process where the K- is absorbed by two nucleons and the decay products are emitted without any further final state interactions among other contributions involving more than two nucleons. Further, the possible contribution of a ppK- bound state was investigated. The best fit gives space to a yield of ppK-/Kstop- = (0.044 ± 0.009 stat-0.005+0.004) × 10-2 corresponding to a binding energy and a width of 45 and 30 MeV/c2, respectively. A statistical analysis of this result shows although that its significance is only at the level of 1σ.
Younes, F; Eghbali, A; De Troyer, S; De Bruyckere, T; Cleymaet, R; Cosyn, J
2016-09-01
Studies on the vertical stability of augmented bone after sinus lifting differ substantially. In addition, long healing periods are usually advocated prior to implant installation. The purpose of this case series study was to evaluate the changes in bone height after sinus lifting with a bovine-derived xenograft and to evaluate the clinical outcome of bone condensing implants installed after a short healing period. Patients treated during the years 2010-2013 were re-examined using peri-apical radiographs to evaluate the changes in augmented bone height (BH) and marginal bone loss (BL). Fifty-seven of 70 eligible subjects (28 male and 29 female, mean age 56 years) attended for reassessment. Data were available for 53 sinus lifts and 105 implants installed after a mean healing period of 4.6±1.5 months. Implant survival was 99% after a mean time in function of 19±9 months. Baseline BH, BH at implant placement, and final BH were on average 3.87±1.74mm, 13.75±2.12mm, and 13.11±2.12mm, respectively (P<0.001). Mean BL was 0.51±0.65mm. Only limited resorption is to be expected after sinus lifting in the short term. A bone condensing implant can be used in the early healing phase with successful outcomes in terms of implant survival and bone adaptation. Copyright © 2016 International Association of Oral and Maxillofacial Surgeons. Published by Elsevier Ltd. All rights reserved.
Permeability profiles in granular aquifers using flowmeters in direct-push wells
Paradis, D.; Lefebvre, R.; Morin, R.H.; Gloaguen, E.
2010-01-01
Numerical hydrogeological models should ideally be based on the spatial distribution of hydraulic conductivity (K), a property rarely defined on the basis of sufficient data due to the lack of efficient characterization methods. Electromagnetic borehole flowmeter measurements during pumping in uncased wells can effectively provide a continuous vertical distribution of K in consolidated rocks. However, relatively few studies have used the flowmeter in screened wells penetrating unconsolidated aquifers, and tests conducted in gravel-packed wells have shown that flowmeter data may yield misleading results. This paper describes the practical application of flowmeter profiles in direct-push wells to measure K and delineate hydrofacies in heterogeneous unconsolidated aquifers having low-to-moderate K (10−6 to 10−4 m/s). The effect of direct-push well installation on K measurements in unconsolidated deposits is first assessed based on the previous work indicating that such installations minimize disturbance to the aquifer fabric. The installation and development of long-screen wells are then used in a case study validating Kprofiles from flowmeter tests at high-resolution intervals (15 cm) with K profiles derived from multilevel slug tests between packers at identical intervals. For 119 intervals tested in five different wells, the difference in log K values obtained from the two methods is consistently below 10%. Finally, a graphical approach to the interpretation of flowmeter profiles is proposed to delineate intervals corresponding to distinct hydrofacies, thus providing a method whereby both the scale and magnitude of K contrasts in heterogeneous unconsolidated aquifers may be represented.
Permeability profiles in granular aquifers using flowmeters in direct-push wells.
Paradis, Daniel; Lefebvre, René; Morin, Roger H; Gloaguen, Erwan
2011-01-01
Numerical hydrogeological models should ideally be based on the spatial distribution of hydraulic conductivity (K), a property rarely defined on the basis of sufficient data due to the lack of efficient characterization methods. Electromagnetic borehole flowmeter measurements during pumping in uncased wells can effectively provide a continuous vertical distribution of K in consolidated rocks. However, relatively few studies have used the flowmeter in screened wells penetrating unconsolidated aquifers, and tests conducted in gravel-packed wells have shown that flowmeter data may yield misleading results. This paper describes the practical application of flowmeter profiles in direct-push wells to measure K and delineate hydrofacies in heterogeneous unconsolidated aquifers having low-to-moderate K (10(-6) to 10(-4) m/s). The effect of direct-push well installation on K measurements in unconsolidated deposits is first assessed based on the previous work indicating that such installations minimize disturbance to the aquifer fabric. The installation and development of long-screen wells are then used in a case study validating K profiles from flowmeter tests at high-resolution intervals (15 cm) with K profiles derived from multilevel slug tests between packers at identical intervals. For 119 intervals tested in five different wells, the difference in log K values obtained from the two methods is consistently below 10%. Finally, a graphical approach to the interpretation of flowmeter profiles is proposed to delineate intervals corresponding to distinct hydrofacies, thus providing a method whereby both the scale and magnitude of K contrasts in heterogeneous unconsolidated aquifers may be represented. Journal compilation © 2010 National Ground Water Association. No claim to original US government works.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREENE,G.A.; GUPPY,J.G.
1998-09-01
This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less
ERIC Educational Resources Information Center
Branzburg, Jeffrey
2006-01-01
In April 2006, Apple released a beta version of Boot Camp, a free software product that enables the installation of Windows XP (Home Edition or Professional with Service Pack 2) on an Intel-based Mac. (A beta version is not the final version, but it is ready for end users to try and test.) Essentially, Boot Camp splits your Mac into two hard…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
...] Notice of Approval of Record of Decision for Extending F-Line Streetcar Service to Fort Mason Center... Environmental Impact Statement (Final EIS) for extending the F-Line historic streetcar service to Fort Mason... turnaround terminus at the Fort Mason Center; and installing appurtenant features such as signals, crossings...
Code of Federal Regulations, 2010 CFR
2010-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. [54 FR 49715, Nov. 30, 1989, as amended at 61 FR 50984, Sept. 30, 1996...
Code of Federal Regulations, 2013 CFR
2013-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. [54 FR 49715, Nov. 30, 1989, as amended at 61 FR 50984, Sept. 30, 1996...
Code of Federal Regulations, 2012 CFR
2012-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. [54 FR 49715, Nov. 30, 1989, as amended at 61 FR 50984, Sept. 30, 1996...
Code of Federal Regulations, 2011 CFR
2011-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. [54 FR 49715, Nov. 30, 1989, as amended at 61 FR 50984, Sept. 30, 1996...
Code of Federal Regulations, 2014 CFR
2014-01-01
... first lien on a residential mobile home if a creditor covered by this part complies with the consumer... the final scheduled installment. (g) Deferral fees. (1) With respect to mobile home credit... money order; do not send cash. [54 FR 49715, Nov. 30, 1989, as amended at 61 FR 50984, Sept. 30, 1996...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... installation of about nine million photovoltaic (PV) solar modules within approximately 437 arrays and... final project design. The proposed Project would consist of: A solar field of ground-mounted PV modules... Federal Loan Guarantee To Support Construction of the Topaz Solar Farm, San Luis Obispo County, CA AGENCY...
40 CFR 1060.135 - How must I label and identify the engines and equipment I produce?
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and other fuel-system components. (a) You must affix a permanent and legible label identifying each... readable for the equipment's entire life. (4) Written in English. (5) Readily visible in the final... BOAT] MEETS U.S. EPA EVAP STANDARDS.” (5) Identify the certified fuel-system components installed on...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-13
... track-and-balance of the tail rotor. Finally, this AD requires installing a vertical stabilizer..., track- and-balance of the tail rotor. Accomplishing the tail rotor track-and- balance would involve both...'' state-- almost to the point of takeoff, and the mechanic would accomplish the vibration measurements...
77 FR 28668 - Technical Standard Order (TSO)-C91a, Emergency Locator Transmitters (ELTs)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... installed in new production airplanes for over the past 5-years. The FAA reiterates in this final notice... questions. The first question regarded permissibility of minor and major changes to existing TSO-C91a... meet the minimum performance standards contained in TSO-C126a. Cobham's second question requested...
Research Turbine Leaves Legacy in Its Wake | News | NREL
110. Two 340-foot cranes were needed to install the larger, 175-foot blades optimized for intermediate depending, to remove the blades, then the nacelle, and finally the tower, section by section. "Site operating the turbine, but also performing complex procedures-like changing out blades that weigh more than
30 CFR 75.207 - Pillar recovery.
Code of Federal Regulations, 2011 CFR
2011-07-01
... be left in place. (b) Before mining is started in a pillar split or lift— (1) At least two rows of... leading into the split or lift. (c) Before mining is started on a final stump— (1) At least 2 rows of... shall be installed between the lift to be started and the area where pillars have been extracted. These...
30 CFR 75.207 - Pillar recovery.
Code of Federal Regulations, 2010 CFR
2010-07-01
... be left in place. (b) Before mining is started in a pillar split or lift— (1) At least two rows of... leading into the split or lift. (c) Before mining is started on a final stump— (1) At least 2 rows of... shall be installed between the lift to be started and the area where pillars have been extracted. These...
76 FR 42161 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
... Gilman Drive; installation of new ramp meters; and, construction of a bicycle path along I-5. The project... at http://www.dot.ca.gov/dist11/envir.htm . Pending Federal actions include: 1. Section 401 Water Quality Certification from the San Diego Regional Water Quality Control Board (RWQCB), under Section 401...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... holding tank, to a municipal wastewater treatment plant or to an on-site septic system. With 37 pumpouts... and install holding tanks for effluent. Such retrofitting is complicated due to the extremely limited... Sanitation Device (MSD) can be converted to a Type III MSD, commonly called a holding tank, which can be...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-19
... aeroplanes, each power or thrust control must be designed so that if the control separates at the engine fuel... control toward lean or shut-off position. (b) Each manual engine mixture control must be designed so that... any generator; and (5) Each generator must have an overvoltage control designed and installed to...
Solar Hot Water for Motor Inn--Texas City, Texas
NASA Technical Reports Server (NTRS)
1982-01-01
Final report describes solar domestic-hot-water heater installation at LaQuinta Motor Inn, Texas City, Texas which furnished 63% of total hot-water load of new 98-unit inn. Report presents a description of system, drawings and photographs of collectors, operations and maintenance instructions, manufacturers' specifications for pumps, and an engineer's report on performance.
DOT National Transportation Integrated Search
1995-02-01
The SYLVIA fiberoptic variable message signs (VMS) were installed on the Old Oregon Trail Highway (I-84) at milepost 263.4 near La Grande and at milepost 286.7 near North Powder. The purpose of the signs is to warn motorists of fog, winter blizzard c...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 39 [Docket No. FAA-2009... AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT). ACTION: Final rule... to FAA AD 2006-21-08] required the installation of new heat shield panels with drainage over the air...
Mission Critical Community Colleges Use Business Partnerships, Grants to Train New IT Workers
ERIC Educational Resources Information Center
Wong, Wylie
2015-01-01
Community colleges are using grants and workforce partnerships to train a new generation of technology workers. In September, the Obama administration awarded $450 million in grants to nearly 270 community colleges that have partnered with more than 400 employers nationally. It was the final installment of a four-year, $2 billion competitive grant…
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
The Power Transistor: A Module on Heat Transfer. Tech Physics Series.
ERIC Educational Resources Information Center
Technical Education Research Center, Cambridge, MA.
This module is intended to provide an understanding of the principles related to heat transfer. The objectives are designed to enable the learner to select and install a device for measuring the temperature of a power transistor, determine power ratings, measure the transient response for a power level and its final equilibrium temperature. Other…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... (western side) and conducting supplemental sand placement along the eastern end of the island. Final locations and placement of sand will be determined during the project design process. For the groin... mammals, birds, fish, and plants. c. Potential impacts associated with using inlets as a sand source. d...
Model Solar Energy Training Program II. Final Report, July 1, 1981-June 30, 1982.
ERIC Educational Resources Information Center
Talcott Mountain Science Center, Avon, CT.
Trained personnel will be needed in the future to install solar energy heating and hot water systems, and public school vocational education teachers will be needed to train these technicians. A project to train high school vocational teachers so that they can teach their students about solar energy concepts, manufacturing techniques, testing, and…
Truss-Integrated Thermoformed Ductwork Final Technical Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Steven Winter; Dianne Griffiths; Ravi Gorthala
2007-08-30
This report summarizes a multi-year research effort to develop a leak-free duct system that can be readily installed within the thermal envelope. There are numerous efforts underway to improve duct system efficiency. Most of these involve modifications to current technology such as air sealing techniques like mastic and aeroseal, snap together duct connections, and greater levels of insulation. This project sought to make a more significant stride forward by introducing a duct system of a material that can be more readily sealed and can exhibit lower friction losses. The research focused on the use of smooth internal surface, low frictionmore » plastic ducts that could be easily installed with very low air leakage. The initial system concept that was proposed and researched in Phase I focused on the use of thermoformed plastic ducts installed in a recessed roof truss underneath the attic insulation. A bench top thermoformed system was developed and tested during Phase I of the project. In Phase II, a first generation duct system utilizing a resin impregnated fiberglass duct product was designed and specified. The system was installed and tested in an Atlanta area home. Following this installation research and correspondence with code officials was undertaken to alleviate the continued concern over the code acceptance of plastic ducts in above ground applications. A Committee Interpretation response was received from the International Code Council (ICC) stating that plastic ducts were allowed, but must be manufactured from materials complying with Class 0 or Class 1 rating. With assurance of code acceptance, a plastic duct system using rotomolded high density polyethylene ducts that had passed the material test requirements by impregnating the material with a fire retardant during the molding process was installed in the basement of a new ranch-style home in Madison, WI. A series of measurements to evaluate the performance benefits relative to a similar control house with a standard sheet metal installation were made.« less
Installation of EarthScope Borehole Strainmeters in Turkey to complement GONAF.
NASA Astrophysics Data System (ADS)
Johnson, W.; Gottlieb, M. H.; Mencin, D.; Van Boskirk, E.; Ozener, H.; Bohnhoff, M.; Bulut, F.; Bal, O.; Acarel, D.; Aydin, H.; Mattioli, G. S.
2015-12-01
Twice in the past 1000 years a sequence of damaging earthquakes has propagated over a period of a few decades along the North Anatolian Fault (NAF) in Turkey towards Istanbul, with the final earthquake in the sequence catastrophically damaging the city. This occurred most recently in 1509, causing 10,000 casualties in a population of about 200,000. The population is now 20 million, the building stock more fragile, and the last earthquake of the current sequence is considered imminent. Since July 2014, UNAVCO has installed 2 EarthScope borehole geophysical instrument strings, which include Gladwin Tensor strainmeters and passive, short-period 3-component seismometers, into boreholes provided by internationally supported Geophysical Observatory at the North Anatolian Fault (GONAF) and Bogazici University Kandilli Observatory. Funding for instruments and staff participation was provided by NSF. If the project remains on schedule, we anticipate that 4 additional BSM strings will be installed by the fall 2015. Our joint international project gives an opportunity to enhance the detection capability of a suite of deep seismometers (GONAF) installed near Istanbul and will permit us to image dynamic rupture along the NAF and to monitor and better understand the tectonic processes leading to failure. The tectonic and geodynamic environment of the NAF near Istanbul in many ways resembles the San Andreas Fault setting of San Francisco; these instruments will enhance the ability to monitor ultra-slow process near the probable source zone of the Mw>7 earthquake beneath the Marmara Sea on the NAF This project has provided UNAVCO an opportunity to gain experience in strainmeters installations outside of North America. The techniques developed to adapt to the challenges of installing borehole strainmeters on islands and other remote locations with limited resources will greatly enhance our ability to install these BSM instruments in similar locations in the future.
The EMBRACE Magnetometer Network in South America: Network Description and Firsts Results
NASA Astrophysics Data System (ADS)
Denardini, Clezio Marcos
We present the new EMBRACE Magnetometer Network in South America, which so far is planned to cover most of the Easter Southern American longitudinal sector deploying magnetometer in several locations. We discuss the purpose and scientific goals of the network, associated with the Low- and Mid-Latitude Ionospheric Currents and Space Weather. We provide details on the instrumentation, the inter-calibration procedure, and installations of equipments already installed. In addition, we present and discuss details on the data storage, near-real time display and availability. Finally, we provide some of the first results we already achieved from this network, including the development of new real time magnetic regional indices for South America. Contacting Author: C. M. Denardini (clezio.denardin@inpe.br)
Numerical investigation of mixing characterstics of chevron nozzle by passive controls method
NASA Astrophysics Data System (ADS)
Devipriya, J.; Kanimozhi, Dr.
2017-05-01
This paper deals with the Reduction of noise in the aircraft exhaust is done by installing Chevrons with particular parameters in the Nozzle section. Numerical investigations have been carried out on chevron Nozzles to evaluate the importance of Chevron parameters by adding number of Chevrons and the mixing characteristics of jet. After assessing the Chevron parameters we vary the Chevron shapes at the exit by installing the triangular wedge in order to regulate maximum noise reduction along with a negligible thrust loss. Finally the results is compared with free jet Nozzle with Chevron and Chevron with wedge has been analysed using CFX CFD software and the results of potential core decay of these Nozzles has been measured from the analysis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Musial, Walt
2015-11-12
Specifically, the work under this CRADA includes, but is not limited to, the development of test procedures for an offshore test site in Delaware waters; testing of installed offshore wind turbines; performance monitoring of those turbines; and a program of research and development on offshore wind turbine blades, components, coatings, foundations, installation and construction of bottom-fixed structures, environmental impacts, policies, and more generally on means to enhance the reliability, facilitate permitting, and reduce costs for offshore wind turbines. This work will be conducted both at NREL's National Wind Technology Center and participant facilities, as well as the established offshore windmore » test sites.« less
1997-07-18
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle
SNS Central Helium Liquefier spare Carbon Bed installation and commissioning
DOE Office of Scientific and Technical Information (OSTI.GOV)
Degraff, Brian D.; Howell, Matthew P.; Kim, Sang-Ho
The Spallation Neutron Source (SNS) Central Helium Liquefier (CHL) at Oak Ridge National Laboratory (ORNL) has been without major operations downtime since operations were started back in 2006. This system utilizes a vessel filled with activated carbon as the final major component to remove oil vapor from the compressed helium circuit prior to insertion into the system's cryogenic cold box. The need for a spare carbon bed at SNS due to the variability of carbon media lifetime calculation to adsorption efficiency will be discussed. The fabrication, installation and commissioning of this spare carbon vessel will be presented. The novel planmore » for connecting the spare carbon vessel piping to the existing infrastructure will be presented.« less
The future cost of electrical energy storage based on experience rates
NASA Astrophysics Data System (ADS)
Schmidt, O.; Hawkes, A.; Gambhir, A.; Staffell, I.
2017-08-01
Electrical energy storage could play a pivotal role in future low-carbon electricity systems, balancing inflexible or intermittent supply with demand. Cost projections are important for understanding this role, but data are scarce and uncertain. Here, we construct experience curves to project future prices for 11 electrical energy storage technologies. We find that, regardless of technology, capital costs are on a trajectory towards US$340 ± 60 kWh-1 for installed stationary systems and US$175 ± 25 kWh-1 for battery packs once 1 TWh of capacity is installed for each technology. Bottom-up assessment of material and production costs indicates this price range is not infeasible. Cumulative investments of US$175-510 billion would be needed for any technology to reach 1 TWh deployment, which could be achieved by 2027-2040 based on market growth projections. Finally, we explore how the derived rates of future cost reduction influence when storage becomes economically competitive in transport and residential applications. Thus, our experience-curve data set removes a barrier for further study by industry, policymakers and academics.
Development of a Fault Monitoring Technique for Wind Turbines Using a Hidden Markov Model.
Shin, Sung-Hwan; Kim, SangRyul; Seo, Yun-Ho
2018-06-02
Regular inspection for the maintenance of the wind turbines is difficult because of their remote locations. For this reason, condition monitoring systems (CMSs) are typically installed to monitor their health condition. The purpose of this study is to propose a fault detection algorithm for the mechanical parts of the wind turbine. To this end, long-term vibration data were collected over two years by a CMS installed on a 3 MW wind turbine. The vibration distribution at a specific rotating speed of main shaft is approximated by the Weibull distribution and its cumulative distribution function is utilized for determining the threshold levels that indicate impending failure of mechanical parts. A Hidden Markov model (HMM) is employed to propose the statistical fault detection algorithm in the time domain and the method whereby the input sequence for HMM is extracted is also introduced by considering the threshold levels and the correlation between the signals. Finally, it was demonstrated that the proposed HMM algorithm achieved a greater than 95% detection success rate by using the long-term signals.
The Mini-Earth facility and present status of habitation experiment program.
Nitta, Keiji
2005-01-01
The history of construction of the CEEF (the Mini-Earth), the configuration and scale of the CEEF are initially described. The effective usable areas in plant cultivation and animal holding and habitation modules and the accommodation equipment installed in each module are also explained. Mechanisms of the material circulation systems belonging to each module and subsystems in each material circulation system are introduced. Finally the results of pre-habitation experiments conducted until the year 2004 for clarifying the requirements in order to promote final closed habitation experiments are shown. c2005 Published by Elsevier Ltd on behalf of COSPAR.
Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Nemet, Gregory F.; Darghouth, Naim
2016-09-01
Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study themore » relationship between market dynamics and pricing with more precision.« less
Measure in the ESRD QIP for PY 2020. Final rule.
2017-08-04
This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2018. It also revises and rebases the market basket index by updating the base year from 2010 to 2014, and by adding a new cost category for Installation, Maintenance, and Repair Services. The rule also finalizes revisions to the SNF Quality Reporting Program (QRP), including measure and standardized resident assessment data policies and policies related to public display. In addition, it finalizes policies for the Skilled Nursing Facility Value-Based Purchasing Program that will affect Medicare payment to SNFs beginning in FY 2019. The final rule also clarifies the regulatory requirements for team composition for surveys conducted for investigating a complaint and aligns regulatory provisions for investigation of complaints with the statutory requirements. The final rule also finalizes the performance period for the National Healthcare Safety Network (NHSN) Healthcare Personnel (HCP) Influenza Vaccination Reporting Measure included in the End-Stage Renal Disease (ESRD) Quality Incentive Program (QIP) for Payment Year 2020.
NASA Astrophysics Data System (ADS)
Rey, Freddy; Labonne, Sophie; Dangla, Laure; Lavandier, Géraud
2014-05-01
In the Southern French Alps under a mountainous and Mediterranean climate, a current strategy of bioengineering is developed for trapping sediment in marly gullies with surface area less than 1 ha. It is based on the use of structures in the form of brush layers and brush mats of cuttings on deadwood microdams. Purple and white Willows (Salix purpurea and S. incana) are recommended here as they proved their efficiency to resprout and survive in such environment. However, these species installed in Southern gullies did not survive in previous experiments, due to the too harsh conditions of solar radiation and drought. We thus decided to test other species, namely black Poplar (Populus nigra) and Tamaris (Tamarix gallica), which proved their resistance to drought conditions in other experiments. To this view, bioengineering structures have been built in 2010 in eroded marly gullies in the Roubines and Fontaugier catchments (Southern Alps, France). We tested two installation modalities: one in spring and a second in autumn. Seventy-eight bioengineering structures (50 in spring and 28 in autumn), among which 32 made with Poplar cuttings and 28 with Tamaris cuttings, as well as 11 structures with purple Willow and 7 with white Willow as controls, were built in 6 experimental gullies. After 3 observation years for each modality (2010 to 2012, and 2011 to 2013, respectively), results first revealed that Willow species succeeded in surviving in gullies in Southern aspect (76 % for the cuttings installed in spring and 52 % for those installed in autumn), which is in contradiction with previous results. Second, Poplar showed a good ability to survive (62 % for the cuttings installed in spring and 33 % for those installed in autumn). Tamaris obtained the worst score with 26 % and 38 % of survival for the cuttings installed in spring and autumn, respectively. Globally, excepted for Tamaris, survival rates were better for the cuttings installed in spring. The bioengineering strategy has therefore been improved by incorporating cuttings of poplar species on the bioengineering structures, whatever the aspect of the gully but specifically on the Southern ones. Tamaris is not recommended as for it. Final recommendation is to preferably install cuttings in spring instead of autumn.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
... hours. The FIRS is available 24 hours a day, 7 days a week, to leave a message or question with the above individual. You will receive a reply during normal business hours. SUPPLEMENTARY INFORMATION: The OTR Corporation, formed by the artists Christo and Jeanne-Claude, proposes to install a work of art...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-21
... end range from 4-8 feet a year based on the latest shoreline change update developed by the NC Division of Coastal Management. The overall length of the terminal groin could range from 800-1,000 feet; however, the final dimensions of the structure could differ following detailed engineering design. The...
ERIC Educational Resources Information Center
Ohio State Univ., Columbus. Center for Vocational and Technical Education.
This document reports on the first of a 3-phase plan to adapt and install a state vocational-technical education comprehensive data system for occupational training in Kentucky. The objective of the system described is to provide more comprehensive analysis of data essential to education decision-makers. Primary users of the system are expected to…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... under Sec. 21.17(b), to Day-VFR operations. Additionally, the FAA also published design criteria to allow expansion of the Aquila AT01-100 airplane to include Night-VFR as shown in NPRM 75 FR 32576. In conjunction with the expansion to Night-VFR operations integrated avionic displays are to be installed on the...
Landfill gas control at military installations. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shafer, R.A.; Renta-Babb, A.; Bandy, J.T.
1984-01-01
This report provides information useful to Army personnel responsible for recognizing and solving potential problems from gas generated by landfills. Information is provided on recognizing and gauging the magnitude of landfill gas problems; selecting appropriate gas control strategies, procedures, and equipment; use of computer modeling to predict gas production and migration and the success of gas control devices; and safety considerations.
77 FR 25729 - Notice of Issuance of Final Determination Concerning Certain Agilent Oscilloscopes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
.... LIT. 7. AC line filter PCA that acts as the power manager; 8. Power supply; 9. Fan; 10. Bucket..., consisting of the fan, the AC Line Filter PCA, power supply, AC and DC cables, and wiring, is installed into... power cable on the front deck subassembly is connected to the AC line filter PCA on the rear deck...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-17
.... We completed a thorough analysis of impacts on the human environment, which we included in the draft.... We would construct an alternate route for the John Hay II Forest Ecology Trail to allow visitors to... spur trail to the fen and back with informational signage on the ecology of fens, and install a...
ERIC Educational Resources Information Center
Koza, Julia Eklund
2010-01-01
In the final installment of her two-part essay, Julia Eklund Koza analyzes prevalent control and management discourse in education, specifically, music education. Arguing that dominant understandings are hierarchical, gendered, illusory, and integrally related to projects and practices largely unrelated to schooling, she invites teachers and…
PV Systems Reliability Final Technical Report: Ground Fault Detection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lavrova, Olga; Flicker, Jack David; Johnson, Jay
We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.
The mindful nurse leader: Key take-away: Go slow before you go fast.
Doucette, Jeffrey N; Cotton, Amy; Arnow, Debra; Pipe, Teri; FitzPatrick, Kate
2016-11-01
The first and second articles in this three-part series on mindfulness described the production of the video "In the Moment: Stories of Mindfulness in Nursing" as part of the authors' Robert Wood Johnson Foundation Executive Nurse Fellowship program. In this final installment, we discuss our leadership approaches and lessons learned, both as a team and individuals.
Code of Federal Regulations, 2011 CFR
2011-07-01
... coordination with the installation commander concerned, will commence preparation of ENG Form 2187-R, if... excessed are clearly defined, action will be initiated to assemble all necessary data so that the final SF... 10 U.S.C. 2662. (g) When the estimated value of the property does not exceed $100,000 and preparation...
Solar Heating Experiment on the Grover Cleveland School, Boston, Massachusetts. Final Report.
ERIC Educational Resources Information Center
General Electric Co., Philadelphia, PA. Space Div.
General Electric Company was one of four contractors who received a contract in early January 1974 to design, build, and install a solar heating experiment in a public school. The overall objective of this program was to obtain data that would assist in evaluating the applicability of solar heating systems in large metropolitan areas. This data…
76 FR 77446 - Airworthiness Directives; Turbomeca S.A. Turboshaft Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-13
... wearing and finally rupture of the P3 air pipe (first section). The loss of P3 air pressure would then... Turbomeca S.A. Arrius 2F turboshaft engines with P3 air pipe (first section) part number (P/N) 0 319 71 918 0, installed. The existing AD currently requires inspections of the P3 air pipe (first section) and...
Solar energy system economic evaluation. Final report for SEECO Lincoln, Lincoln, Nebraska
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-09-01
The economic analysis of the solar energy system that was installed at Lincoln, Nebraska is developed for this and four other sites typical of a wide range of environmental and economic conditions in the continental United States. This analysis is accomplished based on the technical and economic models in the f-chart design procedure with inputs based on the characteristics of the installed system and local conditions. The results are expressed in terms of the economic parameters of present worth of system cost over a projected twenty year life: life cycle savings, year of positive savings and year of payback formore » the optimized solar energy system at each of the analysis sites. The sensitivity of the economic evaluation to uncertainties in constituent system and economic variables is also investigated. Although budget constraints preclude an economic reevaluation of each of the sites, a similar site, Carlsbad, New Nexico, was done. When 1985 escalated values for fuel, costs, mass production, and improved design and installation techniques were applied, a significantly higher degree of savings was realized.« less
Triantafyllidou, Simoni; Raetz, Meredith; Parks, Jeffrey; Edwards, Marc
2012-06-15
The lead leaching potential of new brass plumbing devices has come under scrutiny as a significant source of lead in drinking water (>300 μg/L) of new buildings around the world. Experiments were conducted using ball valves that were sold as certified and known to have caused problems in practice, in order to better understand how installed products could create such problems, even if they passed "leaching tests" such as National Sanitation Foundation (NSF) Standard 61 Section 8. Diffusion of lead from within the device into water when installed can increase lead leaching by orders of magnitude relative to results of NSF testing, which once only required exposure of very small volumes of water within the device. "Normalization" of the lead-in-water result tended to produce estimates of lead concentration that were much lower than actual lead measured at the tap. Finally, the presence of flux could also dramatically increase lead leaching, whereas high water velocity had relatively little effect. Copyright © 2012. Published by Elsevier Ltd.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Oliu oversees the image lab that is using an advanced SGI TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASAs Marshall Space Flight Center in Alabama in reviewing the tape.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Reporters are eager to hear from Armando Oliu about the aid the Image Analysis Lab is giving the FBI in a kidnapping case. Oliu, Final Inspection Team lead for the Shuttle program, oversees the lab that is using an advanced SGI TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASAs Marshall Space Flight Center in Alabama in reviewing the tape.
NASA Technical Reports Server (NTRS)
2004-01-01
KENNEDY SPACE CENTER, FLA. Armando Oliu, Final Inspection Team lead for the Shuttle program, speaks to reporters about the aidced the Image Analysis Lab is giving the FBI in a kidnapping case. Oliu oversees the image lab that is using an advanced SGI TP9500 data management system to review the tape of the kidnapping in progress in Sarasota, Fla. KSC installed the new $3.2 million system in preparation for Return to Flight of the Space Shuttle fleet. The lab is studying the Sarasota kidnapping video to provide any new information possible to law enforcement officers. KSC is joining NASAs Marshall Space Flight Center in Alabama in reviewing the tape.
1985-07-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...described in Section 7. 2-bromo- 1 - chloropropane , and 0.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop 14-dichlorobutane is...46 UNCLSSIFIED F/G 13/2 UL mhmmhmhohEEEmhI wJI. 1.0S ’, LI U.2..12.2 1 . 111110 MICROCOPY RESOLUION ES CHART""., -6 -’S- . 1 °"°, 5- -i -1.0..-+-’.2,i
Low-metallicity (sub-SMC) massive stars
NASA Astrophysics Data System (ADS)
Garcia, Miriam; Herrero, Artemio; Najarro, Francisco; Camacho, Inés; Lennon, Daniel J.; Urbaneja, Miguel A.; Castro, Norberto
2017-11-01
The double distance and metallicity frontier marked by the SMC has been finally broken with the aid of powerful multi-object spectrographs installed at 8-10m class telescopes. VLT, GTC and Keck have enabled studies of massive stars in dwarf irregular galaxies of the Local Group with poorer metal-content than the SMC. The community is working to test the predictions of evolutionary models in the low-metallicity regime, set the new standard for the metal-poor high-redshift Universe, and test the extrapolation of the physics of massive stars to environments of decreasing metallicity. In this paper, we review current knowledge on this topic.
Processing activities for STS-91 continue in OPF Bay 2
NASA Technical Reports Server (NTRS)
1998-01-01
Processing activities for STS-91 continue in KSC's Orbiter Processing Facility Bay 2. Two Get Away Special (GAS) canisters are shown after their installation into Discovery's payload bay. At left is G-648, an Canadian Space Agency-sponsored study of manufactured organic thin film by the physical vapor transport method, and the can on the right contains commemorative flags to be flown during the mission. STS-91 is scheduled to launch aboard the Space Shuttle Discovery for the ninth and final docking with the Russian Space Station Mir from KSC's Launch Pad 39A on June 2 with a launch window opening around 6:04 p.m. EDT.
Development Studies for a Novel Wet Oxidation Process
DOE Office of Scientific and Technical Information (OSTI.GOV)
Delphi Research
1999-09-30
DETOX is a catalyzed wet oxidation process that destroys organic materials in an acidic water solution of iron at 373 to 473 K. The solution can be used repeatedly to destroy great amounts of organic materials. Since the process is conducted in a contained vessel, air emissions from the process can be well controlled. The solution is also capable of dissolving and concentrating many heavy and radioactive metals for eventual stabilization and disposal. The Phase III effort for this project is fabrication, assembly, and installation of the DETOX demonstration unit, preparation of documentation and training to meet site requirements formore » operation, followed by system run-in and shakedown testing of the unit prior to demonstration testing. The Title III design was completed and the unit was fabricated according to standards set forth by OSHA, EPA, the American Petroleum Institute (i.e., chemical and petroleum industry standards), and the ASME B-313 Piping Code requirements as agreed to in preliminary design meetings with primary stakeholders. The unit was assembled in three modules and two trailers and then shipped to the TNX facility at the Savannah River Site in September and october of 1996. On-going site integration tasks were address while delays in installation arose due to funding sources and costs. In March of 1997, Delphi was authorized to proceed with the installation of the unit, making electrical and mechanical connections necessary to operate the unit. All installation tasks were completed in August of 1997. Results of an Operational Readiness Review conducted in August 1997 verified that Delphi's procedures and documentation met the necessary requirements to operate the unit at SRS. Completion of the final checklist of WSRC requirements was then addressed including the Owner's Independent Inspection Report, verifying all components of the unit met B-31.3 standards. Final hydraulic and pneumatic tests were completed in November to satisfy the B-31.3 requirement. During the month of December, the control system and heating and cooling systems were then prepared to initiate system startup and conduct the run-in tests. Shakedown tests were combined with the Phase IV tasks due to DOE funding constraints, i.e., tests formerly planned to be conducted with oil and solid materials were deferred to Phase IV and combined with similar testing. Once run-in testing has been completed, the primary objectives of Phase III will have been achieved and the project will be ready to proceed to demonstration testing (Phase IV).« less
Results of the first detection units of KM3NeT
NASA Astrophysics Data System (ADS)
Biagi, Simone; KM3NeT Collaboration
2017-12-01
The KM3NeT collaboration is building a km3-scale neutrino telescope in the Mediterranean Sea. The current phase of construction comprises the deep-sea and onshore infrastructures at two installation sites and the installation of the first detection units for the "ARCA" (Astroparticle Research with Cosmics in the Abyss) and "ORCA" (Oscillation Research with Cosmics in the Abyss) detector. At the KM3NeT-It site, 80 km offshore Capo Passero, Italy, the first 32 detection units for the ARCA detector are being installed and at the KM3Net-Fr site, 40 km offshore Toulon, France, 7 detection units for the ORCA detector will be deployed. The second phase of KM3NeT foresees the completion of ARCA for neutrino astronomy at energies above TeV and ORCA for neutrino mass hierarchy studies at energies in the GeV range. The basic element of the KM3NeT detector is the detection unit. In the ARCA geometry, the detection unit is a 700 m long vertical structure hosting 18 optical modules. Each optical module comprises 31 3 in photomultiplier tubes, instruments to monitor environmental parameters, and the electronic boards for the digitisation of the PMT signals and the management of data acquisition. In their final configuration, both ARCA and ORCA will be composed of about 200 detection units. The first detection unit was installed at the KM3NeT-It site in December 2015. It is active and taking data since its connection to the subsea network. The time of arrival and the duration of photon hits on each of the photomultipliers is measured with a time resolution of 1 ns and transferred onshore where the measurements are processed, triggered and stored on disk. A time calibration procedure, based on data recorded with flashing LED beacons during dedicated periods, allows for time synchronisation of the signals from the optical modules at the nanosecond level. In May 2016, an additional detection unit was installed at the KM3NeT-It site. The first results with two active detection units are presented. An update of the detector status and construction is given.
Final Report to the Department of Energy Renewable Energy and Energy Efficiency
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gaughen, Shasta
The Pala Band of Mission Indians was awarded a DOE-EERE Solar Energy Grant for FY 2016 and 2017. The project involved installing a 94.8 kW DC photovoltaic (PC) solar system on the Pala Fire Station to offset up to 95% of grid-derived energy and reduce overall CO 2 generation from the facility. Pala successfully installed rooftop and carport-mounted solar panels at the fire station, and to date has generated of 219,227 kWh of energy and offset 274,034 pounds of CO 2. The project was successfully executed, and we recommend other tribes to undertake similar projects if they are located inmore » areas with sufficient solar exposure. DOE should continue to make these funds available to tribes.« less
STS-128 EVA 3 Node 3 Tranquility Avionics Cable Routing OPS
2009-09-05
S128-E-007720 (5 Sept. 2009) --- NASA astronaut John “Danny” Olivas (left) and European Space Agency astronaut Christer Fuglesang, both STS-128 mission specialists, participate in the mission's third and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the seven-hour, one-minute spacewalk, Olivas and Fuglesang deployed the Payload Attachment System (PAS), replaced the Rate Gyro Assembly #2, installed two GPS antennae and did some work to prepare for the installation of Node 3 next year. During connection of one of two sets of avionics cables for Node 3, one of the connectors could not be mated. This cable and connector were wrapped in a protective sleeve and safed. All other cables were mated successfully.
1998-11-12
The Stardust spacecraft sits in the Payload Hazardous Service Facility waiting to undergo installation and testing of the solar arrays, plus final installation and testing of spacecraft instruments followed by an overall spacecraft functional test. At the top is the re-entry capsule. Built by Lockheed Martin Astronautics near Denver, Colo., for the Jet Propulsion Laboratory (JPL) and NASA, the spacecraft Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. The collected samples will return to Earth in the re-entry capsule to be jettisoned from Stardust as it swings by Earth in January 2006
1998-11-12
The Stardust spacecraft sits in the Payload Hazardous Service Facility waiting to undergo installation and testing of the solar arrays, plus final installation and testing of spacecraft instruments followed by an overall spacecraft functional test. At the top is the re-entry capsule. Built by Lockheed Martin Astronautics near Denver, Colo., for the Jet Propulsion Laboratory (JPL) and NASA, the spacecraft Stardust will use a unique medium called aerogel to capture comet particles flying off the nucleus of comet Wild 2 in January 2004, plus collect interstellar dust for later analysis. Stardust will be launched aboard a Boeing Delta 7426 rocket from Complex 17, Cape Canaveral Air Station, targeted for Feb. 6, 1999. The collected samples will return to Earth in the re-entry capsule to be jettisoned from Stardust as it swings by Earth in January 2006
1995-03-24
Outlined with gold stripes are the hinged nose strakes, modifications made to NASA's F-18 HARV (High Alpha Research Vehicle) at the Dryden Flight Research Center, Edwards, California. Actuated Nose Strakes for Enhanced Rolling (ANSER) were installed to fly the third and final phase in the HARV flight test project. Normally folded flush, the units -- four feet long and six inches wide -- can be opened independently to interact with the nose vortices to produce large side forces for control. Early wind tunnel tests indicated that the strakes would be as effective in yaw control at high angles of attack as rudders are at lower angles. Testing involved evaluation of the strakes by themselves as well as combined with the aircraft's Thrust Vectoring System. The strakes were designed by NASA's Langley Research Center, then installed and flight tested at Dryden.
Impact of aerial infrared roof moisture scans on the U.S. Army's ROOFER program
NASA Astrophysics Data System (ADS)
Knehans, Al; Ledford, Jim
1993-04-01
The ROOFER program is being used by the U.S. Army to inspect and evaluate its built-up and single-ply membrane roofs. The results of the inspection effort are used to develop an overall roof condition index. The condition of the roof insulation can greatly alter the final condition index. By using an aerial infrared (IR) roof moisture scan, all the insulated roofs at most Army installations can be effectively surveyed in a very short time. The aerial scans have detected numerous areas of wet roof insulation, which has had a profound impact on the results of the ROOFER program. The scans have also provided management personnel with more accurate analysis as to the actual condition of the installation's insulated roofs.
1999-07-08
KENNEDY SPACE CENTER, FLA. -- In the cockpit of the orbiter Atlantis, which is in the Orbiter Processing Facility, U.S. Rep. Dave Weldon looks at the newly installed Multifunction Electronic Display Subsystem (MEDS), known as the "glass cockpit." Weldon is on the House Science Committee and vice chairman of the Space and Aeronautics Subcommittee. He was in Palmdale, Calif., when Atlantis underwent the modification and he wanted to see the final product. The full-color, flat-panel MEDS upgrade improves crew/orbiter interaction with easy-to-read, graphic portrayals of key flight indicators like attitude display and mach speed. The installation makes Atlantis the most modern orbiter in the fleet and equals the systems on current commercial jet airliners and military aircraft. Atlantis is scheduled to fly on mission STS-101 in early December
Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF
NASA Technical Reports Server (NTRS)
1997-01-01
This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.
The first aluminum coating of the 3700mm primary mirror of the Devasthal Optical Telescope
NASA Astrophysics Data System (ADS)
Bheemireddy, Krishna Reddy; Gopinathan, Maheswar; Pant, Jayshreekar; Omar, Amitesh; Kumar, Brijesh; Uddin, Wahab; Kumar, Nirmal
2016-07-01
Initially the primary mirror of the 3.6m Devasthal Optical Telescope is uncoated polished zerodur glass supplied by Lytkarino Optical Glass Factory, Russia/Advanced Mechanical and Optical Systems, Belgium. In order to do the aluminium coating on the primary mirror the coating plant including washing unit is installed near the telescope (extension building of telescope) by Hind High Vacuum (HHV) Bangalore, India. Magnetron sputtering technique is used for the coating. Several coating trials are done before the primary mirror coating; samples are tested for reflectivity, uniformity, adhesivity and finally commissioned. The primary mirror is cleaned, coated by ARIES. We present here a brief description of the coating plant installation, Mirror cleaning and coating procedures and the testing results of the samples.
FIELD STUDIES OF GEOMEMBRANE INSTALLATION TECHNIQUES
Fourteen construction sites where geomembranes were being installed were visited to observe subgrade preparation and liner installation techniques. These sites were visited during a study conducted for the U.S. EPA, Solid and Hazardous Waste Research Division. The sites included ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-05-18
We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Shaughnessy, Eric; Margolis, Robert
2017-05-19
We use residential solar photovoltaic (PV) quote data to study the role of firm size in PV installer pricing. We find that large installers (those that installed more than 1,000 PV systems in any year from 2013 to 2015) quote higher prices for customer-owned systems, on average, than do other installers. The results suggest that low prices are not the primary value proposition of large installers.
Thermoelectric-Driven Autonomous Sensors for a Biomass Power Plant
NASA Astrophysics Data System (ADS)
Rodríguez, A.; Astrain, D.; Martínez, A.; Gubía, E.; Sorbet, F. J.
2013-07-01
This work presents the design and development of a thermoelectric generator intended to harness waste heat in a biomass power plant, and generate electric power to operate sensors and the required electronics for wireless communication. The first objective of the work is to design the optimum thermoelectric generator to harness heat from a hot surface, and generate electric power to operate a flowmeter and a wireless transmitter. The process is conducted by using a computational model, presented in previous papers, to determine the final design that meets the requirements of electric power consumption and number of transmissions per minute. Finally, the thermoelectric generator is simulated to evaluate its performance. The final device transmits information every 5 s. Moreover, it is completely autonomous and can be easily installed, since no electric wires are required.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-31
MAXIMUM is short for Multiple Application X-ray IMaging Undulator Microscope, a project started in 1988 by our group at the Synchrotron Radiation Center of the University of Wisconsin-Madison. It is a scanning x-ray photoemission microscope that uses a multilayer-coated Schwarzschild objective as the focusing element. It was designed primarily for materials science studies of lateral variations in surface chemistry. Suitable problems include: lateral inhomogeneities in Schottky barrier formation, heterojunction formation, patterned samples and devices, insulating samples. Any system which has interesting properties that are not uniform as a function of spatial dimension can potentially be studied with MAXIMUM. 6 figs.,more » 3 tabs.« less