Installation Restoration Program. Confirmation/Quantification Stage 1. Phase 2
1985-03-07
INSTALLATION RESTORATION PROGRAM i0 PHASE II - CONFIRMATION/QUANTIFICATION 0STAGE 1 KIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117 IIl PREPARED BY SCIENCE...APPLICATIONS INTERNATIONAL CORPORATION 505 MARQUETTE NW, SUITE 1200 ALBUQUERQUE, NEW MEXICO 871021 5MARCH 1985 FINAL REPORT FROM FEB 1983 TO MAR 1985...QUANTIFICATION STAGE 1 i FINAL REPORT FOR IKIRTLAND AFB KIRTLAND AFB, NEW MEXICO 87117U HEADQUARTERS MILITARY AIRLIFT COMMAND COMMAND SURGEON’S OFFICE (HQ MAC
1988-11-01
revri if necenary and iIenitif by block number) FIELO GROUP SUS-GROUP Installation Restoration Program , Groundwater ,P& Soils. Surface water ...qoulkhave been affected by the Site 3 flight line storm drainage outfall. Groundwater quali y samples were collected from the Site 4 water supply well No...monitoring. o Groundwater from the Site 4 water well No. 10 contains no VOCs. Because it remains unclear whether levels of THMs previously measured
1984-05-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...CHESTER PH MAY 84 UNCLASSIFIED F336 iS-80-D-4-86 F/G 5/ 1 NL I l/hlhh..E/hhE mhh~hhElhElhhI mhhmhmmhhmhl Iflf lllflflflflfllfl mhhhhhmhhmmhhu Llw 111112...w1L 1 6 MICROCOPY RESOLUTION TEST CHART NATIONIAL BUREAU OF STANDARDS- 1963-A Installation Restoration Proaram AD-A 145 352 * Final Report Phase 11
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, W.J.; Liddle, S.K.
1986-09-01
The primary objectives of this project were to collect and analyze groundwater, surface water, and sediment samples and to perform an initial characterization of the hydrogeochemical regime at potential contamination sites on Shaw Air Force Base near Sumter, South Carolina. This study constituted Phase II of the U.S. Air Force Installation Restoration Program (IRP). Five potential sources of groundwater pollution were studied. The evaluation primarily included the drilling of soil test borings, the installation, development, and sampling of groundwater monitoring wells, and the analyses of soil, surface water, and groundwater samples. Also used in the study were field measurements ofmore » water quality, water-level measurements site observations, published hydrogeologic data and Shaw AFB documents.« less
Installation Restoration Program. Phase 1. Records Search 15th ABW Satellite Installations, Hawaii
1984-09-01
Hickam POL Storage Facilities and Pipeline The POL storage facilities remotely located from Hickam Air Force Base (AFB...airfield with less activity than nearby Wheeler and Hickam Air Force Bases . Aircraft activity was significantly reduced in the late 1940’s and the...United States Air Force to conduct the Phase I Records Search at the 15th Air Base Wing 1-2 ES ENGINEERING-SCIENCE PHASE I PHASE 11 PHASE IV
Installation Restoration Program. Phase 1 - Records Search, Elmendorf AFB, Alaska
1983-09-01
Installation Restoration Hazardous Waste Management Past Solid Waste Disposal Sites Ground Water Contamination 26. ABSTRACT (CO- ffew. - reev. ilde It necessar...Activity Review 4-1 Industrial Operations (Shops) 4-2 Fire Training 4-13 Fuels Management 4-15 Description of Past On-sane Disposal Methods 4-23 Waste...characteristics, potential for contaminant migration and waste management practices. The details of the rating procedure are presented in Appendix H and the
1984-10-01
8 iii "i t-. Table of Contents (cont.) Section Title Page -APPENDIX A Acronyms, Definitions, Nomenclature and Units of Measure B Scope of Work, Task...Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective Action Only...Problem Identification/Records Search Phase II - Problem Confirmation and Quantification Phase III - Technology Base Development Phase IV - Corrective
1985-06-28
1984 to April 1985 includedr installation of 27 raw mnitor wells and 11 amh l’,(1 zjit~s, collecticn cf seive~t, sarples ftw surfac , soil, shallowv...modifying a sampling and analytical program that addresses the requirements of the project. If project requirements necessitate different quality...reagent blank and at least five (5) different concentrations of thl analyte. A modification of the method of Hubaux and Vos will be used to deter
1985-08-30
technology for objective assessment of adverse effects. A Phase III requirement can be identified at any time during the program. 4. Phase IV - Operations...earth’s field can be asso- ciated with naturally occurring materials, or buried iron objects and remnant cultural features associated with man’s...for as * adequately as that of its own personnel.I 2. Obviously, such objectives can be attained only by the cooperation of all concerned. Therefore, it
Installation Restoration Program. Phase II--Confirmation/Quantification. Stage 1.
1985-03-01
four phases. Phase I, Initial Assessment/ Records Search, is designed to identify possible hazardous waste contami- nated sites and potential...7 71 -. - - IL’ -, 1% 33 AihlIII Is 33 n~iL t iiC UII! ii CL C LU 1-3, Phase II, Confirmation and Quantification, is designed to confirm the...additional monitoring data upon which design of mitigative actions are based. In Phase III, Technology Base Development, appropriate technology is selected and
Installation Restoration Program. Phase 1 - Records Search, Robins AFB, Georgia.
1982-04-01
Installations U under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980. PURPOSE AND SCOPE OF THE... Liability Act of 1980 (CERCLA). A potentially hazardous waste is one which is suspected of being hazardous although insufficient data are available to...comprised of a concrete vault buried approximately six feet below the ground surface. 4 A locked chain -linked fence with two barbed wire strands surrounds
1985-09-01
GM SILTY GRAVEL GP POORLY GRADED GRAVEL SM SILTY SAND SP POORLY GRADED SAND SW WELL GRADED SAND ML LOW PLASTICITY SILT SOURCE: INSTALLATION DOCUMENTS... plastic on the side toward th’e beach in an attempt to prevent migration of fuel. to the beach. During the site visit for this Phase I IRP study the...Force have included garbage, refuse, incinerator ash (since 1975), wood, metal, plastic and bulky - materials such as construction and demolition debris
1981-11-01
Additional ferns, including Eaton lip fern, occur on shady granite outcroppings. Reveechon three-awn, Scribner needlegrass, noseburn, bear grass, banana ...torrey rush, and smooth monkey flower are among the more obvious plants in this area. Arroyos and seasonally intermittent streams support other
Installation Restoration Program. Phase 2. Confirmation McClellan AFB, California. Volume 1
1983-06-01
testing in accordance with ASTH C 828-78 and in conformance with CAL/ OSHA safety orders and ES Industrial Sewer Entry Procedures. Indi- viduals entering...Liquid Palm Cil Wastes," Proceedings: Asia Acuatech, Singapore, Malaysia , March 1980 (Coauthors R. White and C. Ponniah). "Surface Impoundment of
Installation Restoration Program. Phase I. Records Search. Vandenberg Air Force Base, California.
1984-12-01
acidity or alkalinity POL Petroleum, oils, and lubricants PVC Polyvinyl chloride plastic RCRA Resource Conservation and Recovery Act RP-1 Rocket propellant...multiplter: Subscore 3 K ?hvsical State ulriptier Waste Caracteristics Subscore 50 X 1 50 11-1. CS-I HAZARD ASSESSMENT RATING METHODOLOGY FORM (Continued
Umatilla River Subbasin Fish Habitat Improvement Program, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Hilaire, Danny R.
This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The Program works cooperatively with private landowners to develop long-term restoration, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestock exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and,more » more recently, to channel re-design and reconstruction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary of Program activities for the 2004 calendar year (January 1 through December 31, 2004), within each of the four main project phases, including: (1) Implementation--Pre-Work, (2) Implementation--On Site Development, (3) Operation and Maintenance, and (4) Monitoring and Evaluation. This report also summarizes Program Administrative, Interagency Coordination, and Public Education activities.« less
Installation Restoration Program. Phase 1. Records Search, Charleston AFB, South Carolina
1983-10-01
and plastics plants. Conducted industrial waste surveys, landfill design, and planning for plant environmental protection programs; evaluated air...management study for a major plastics manufacturing company. Responsibilitites included identification and investigation of a number of operating...61 aste Caracteristics 68 Pathways 69 Total 198 divided by 3 = 63 3ross total sc,:re B. Aooly factor for waste containment from waste manaement
1985-01-01
a pavillion with a snack bar, six cabins, eight recreational vehicle camping sites with electrical -- hookup only, a covered picnic area, and a small...solidification. Lava: The material extruded by a volcano which consists of molten or part- molten silicate material. Leachate: A solution resulting from
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1
1986-03-28
Comftin,,,on Fvvem in.eea),a n dftl by bloe * numri ~A Problem Confirmation Study was conducted at Burlington Air National Guard BasE in Vermont. The...cont’d) 3. Characteristics(cont’d)- Biological Agent ( ) Volatile (4f Toxic (). Reactive ( ) 4. Toxicity: TLVs IDLHs 5. Special Hazards 6. Acute
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 3.
1988-02-05
EOCENE: Strata of the Tertiary era, between the Paleocene and Oligocene , lasting from 60 to 40 million years before the present. EPA: U.S. Environmental...for warm storage). The person who returns the sample will place his signature and date in the appropriate space on the check-out list. Sample Control
Installation Restoration Program. Phase 1: Records Search, Whiteman AFB, Missouri
1984-03-26
Aquazene (Ciba-Geigy) was added to each remote site lagoon (A-i through N-i) on a one-time basis as an algicide . Brine line leakage has been noted at...layered strata are inclined down and away from the axes. AQUAZENE: an algicide . ARRS: Aerospace Rescue and Recovery Squadron. ARTESIAN: Ground water
1984-11-01
FLOW CHART Complet List of Location/Shtes Evaluation of Past Operations at LUste SNMe * ~Potential Hazard to Healh WelareS Reglaor Agencon consolidat...siting studies were also a part of this tions, soil, groundwater sampling and large complex project. analysis, and remedial concept engi- neering. Project
Installation Restoration Program. Phase 1: Records Search, Pope Air Force Base, North Carolina
1985-05-01
Diazinon Calcium Cyanide A-Dust Pramitol 25E Mayforce Rodeo PZ 270 Dursban Fungicides Prograss PZ 250 Baygon Weed Hoe 108 Unicorn Fogging Solution Benlate...head; the direction in which ground water flows. I DPDO: Defense Property Disposal Office, previously included Redistri- bution and Marketing (R&M
Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.
1982-04-01
Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975
1986-03-01
Evaluation of Past Operations ] at Listed Sites Contamination Delee StesPotential for I De’ere tesI Migrationl S Potential for IOther N Environmental... Microbiology , New Orleans. Louisiana. March 1983. Effect of particles on degradation of bromobenzene in a simulated groundwater environment
1986-10-01
Kaskaskia to the southwest, the Embarras to the south and the Vermilion to the southeast. Surface flow from the Base is ultimately conveyed to the Wabash ...of this characterization showed that arsenic, cadmium , chromium, lead, mercury, selenium, and silver were all below detection limits. The only EP TOX
1988-10-01
TOTAL DISSOVLED SOLIDS 3523/017 1896 1918 --- 3538/024 2625 2567 --- IV. PETROLEUM HYDROCARBON DUPLICATE ANALYSIS WAS NOT DONE DUE TO INSUFFICIENT...Characterized existing hydrogeologic conditions, prepared hydrologic budgets, delineated productive aquifers, performed safe yield determinations , and...New Jersey to determine suitability for building construction. * Supervised soil borings program at large waste disposal facility in Model City, New
Installation Restoration Program for Richards-Gebaur AFB. Phase 2. Field Evaluation
1983-12-01
of the Phase I--Records Search. "ýThe specific task was to determine whether environmental contamination of groundwater or surface water had resulted...concentrations (4 and 5 ug/L, respectively) which exceeded the Missouri Water Quality Standards for groundwater (I ug/L). A limited followup study was...contamination of groundwater and surface water had resulted from waste handling and disposal at two ’and- fills on Richards-Gebaur Air Force Base (AFB
Installation Restoration Program. Phase I. Records Search, Grand Forks Air Force Base, North Dakota.
1985-04-01
and Liability Act . (CERCLA) of 1980, Executive Order 12316, and 40 CFR 300 Subpart F O* (National Oil and Hazardous Substances Contigency Plan...response action on USAF installations under the provisions of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, as...COMBAT ICBT, OPSRA1ON$ MAINI’IPAIICE MAKGIMEIE WPPloTn GROP OIEGRO UP FIOSPITAL, 441 SM)tsU SUPLY 14O SIC 2 SP 447 SM S o u R M I3 1 1 5 E EE2 TENANT
Installation Restoration Program. Phase 1. Records Search, Pease AFB, New Hampshire
1984-01-01
Kevin Hopkins, RCRA Permits, 603/271-4622 4. New Hampshire Water Supply and Pollution Control Commission Industrial Waste Division Concord, New...LPapilatiou syed try s=u-aca waer ~ sply wi-:n3 n±il" _wY!s=*aof _________ T. Pow"",- sacrped byT qr-’dý-was SCW17 Sublectais kcup%==subacr
1983-04-01
Honorary Fraternity Gamma Eta Chapter- Secretary A-12 JAMES F. BRAITHWAITE, P.E. QUALIFICATIONS SUIMIARY PRINCIPAL James Braithwaite is Executive Vice...X factor Score subtotaLd/aaius .Me aubtOtal .7 C. oigmast pathway mabe "cre. l t~ thi ghest sabfoe Valueoo a. S-1. 9 -2 at 0-3 aboe. pathaysSubeorv
1990-01-01
1-20 1-6 Sites Defined and Ranked During IRP Phase I Study. 1-29 1-7 Aerial Photograph of Site 2, April 1988. 1-32 1-8 Site 2 Sampling Locations...Utilized During Phase II Investigations. 1-35 1-9 Aerial Photograph of Site 3, April 1988. 1-38 1-10 Site 3 Sampling Locations Utilized During Phase II...Investigations. 1-47 1-11 Aerial Photograph of Site 4, April 1988. 1-54 1-12 Site 4 Sampling Locations Utilized During Phase II Investigations. 1-57 1-13
1989-05-01
AFB Statement of Work. The Phase II Stage 1 investigation of Malmstrom AFB and two off-Base sites at Shelby and Brady, Montana are described in a...Flathead National Forest Headquarters in Kalispell and the Big Fork Ranger Station in Big Fork . Because there has been litigation involved with this...reviewed by phone. An interview at the spill site was held with Mr. William Pedersen, U.S. Forest Service Ranger for the Big Fork District. He personally
32 CFR 202.1 - Purpose, scope, definitions, and applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...
32 CFR 202.1 - Purpose, scope, definitions, and applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... dialogue with, and provide comments and advice to the installation's decision makers concerning environmental restoration matters. Installations shall give careful consideration to the comments provided by... program. (2) Environmental restoration shall include the identification, investigation, research and...
1985-07-01
Shall not impose water uses, unless naturally occurring (generally ɘ.015 mg/l) Gross Beta Radioactivity <,000 picocuries/liter (pCi/l) Str nt till 9J...trace - Chlorine "s chloride ..... _47.0 35.0 H-rdness 5.2 , 94 Iron .... __0.10 4,.70 Copper Lead Pheno l,k~.Iinlty ____ ______ __ ______ To t a I_" Mung
1983-12-01
clarifiers, activated sludge units, trickling filters, aerobic and anaerobic digesters, and various dowatering devices and recommendations for...for locations of water- bearing fractures. Additional responsibilities included drilling with mud and air rotary drilling rigs as well as bucket auger...interpretation. Also conducted earth resistivity surveys in Georgia and Alabama Piedmont Provinces for locations of water- bearing fractures. Additional
1984-11-01
quantities of vegetative grco th thr¢cu:ho r ts area. Infiltration of runoff and drainage waLers wuuld o icu n . this area. 3.3.2 SurfEa:- Waer Quality...Wisconsin 608-266-7809 Kevin Kessler Groundwater Coordinator Wisconsin Department of Natural Resources Madison, Wisconsin 608-267-9350 Frank Schultz
Installation Restoration Program, Phase II (Stage 2-1). Volume 2.
1985-05-01
Worthington OH PAGES: 89 SOURCE: Radian Library COMMENTS: General manual for well drilling, sample collection . Includes good elementary background. FIRST... Collected from the Base Industrial and Domestic Waste Water Treatment Plants and Field * Sampling Data PAGES: 75 p. SOURCE: Capt. Mario Ierarti * COMMENTS...Analytical results for samples collected from the * base industrial and domestic wastewater treatment plants have been included. RADIAN FIRST AUTHOR
1985-12-20
Kalles . 1976. Evaporation rates of methylene chloride, chloroform, 1,1,1-trichloroethane, trichloroethylene, tetrachoroethylene, and other chlorinated...State University (1969) M.S., Geology, University of Washington ( 1971 ) . . Ph.D., University of Washington (1979) " EXPERIENCE 1984 to Date Senior...ducted environmental assessments for Pacific Northwest construc- tion projects. L- 1971 Project Geologist, SEREM of Alaska (BRGM-France). Responsibil
Installation Restoration Program. Phase 1. Records Search, England AFB, Louisiana
1983-05-01
compound shown on Figure 4.3. No herbicides, expired DDT or other pesticides were stored at this site. Some battery acid was stored in plastic boxes...Union Carbide Corporation, Chemicals and Plastics Divi- sion, Environomental Engineering Department. As a pro- cess/project engineer performed...paper mill waste treatment facility. Project Manager on Solid and Hazardous Waste study for a diverse chemicals and plastics production facility
1982-07-01
and waste treatment pilot plants . Developed odor control program which suc- cessfully reduced odor emissions and represented Union Carbide at a public...the runway where oil and grease has been detected as well as the discharge from the City of Goldsboro waste- water treatment plant which occurs within...There are no known threatened or en- dangered plant species on base. The only endangered animal species which may potentially inhabit the base is the Red
1986-08-09
WATER ASSESSMENT PROGRAM AIR FOsEa PLANT 6, L0CKED-GEOCIA CONPANY MARIETTA, GMO IA PROJECT NO. 611059 WELL 4W-22 WELL 4W-23 WELL MW-24 WELL 4W-25 Dace...PROGRAMo PHASE II--CONFIRMATION/QUANTIFICATION 0STAGE I Final Report for AIR FORCE PLANT 6, COBB COUNTY, GA. U.S. AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL...Con uet on reverse 4 necessary arc .entir’y ay )lcx "UrCer) I;;EL_0 GROUP I SUB-GROuP Air Force Plant , Hazardous materialsI oilS’ DeB Ground water, S
1984-11-01
R &D investigations. 1.3 PHASE IV SITE DESCRIPTIONS I Three primary sites are included in this Phase IV...34C z I L . ...- I I E I I i -\\ = _ _ _ . .. .....,. . .. .. I x FIGURE 1.7 a qq"-.. .. .. .. .. .. "- _ r JI I g I I1 ,n I , I I I " I - I Br-.,,-%~l...0 0 4J 4) 44 4) V ) -H 0 4 6: 144 d 0 4 14 404)-4 -4 4 .4 N ) 4 0 4) 4 40 4) 4) 0.0
1986-04-30
Si 35 Areas E and J Waste Disposal Sites and IRP Phase II Monitoring Well Locations ^ 36 Areas F and H Waste Disposal Sites and IRP Phase II...4 oMe c hy 1 - 2 - Pen eeaocie lephchelene 1.2- Trene Dlchloroechyle 1,1,1-Trlchloroechene Toluene Tinyl Acftcete H.P-Xylene 0-Xylene ACIDS AW) OTMEKS...4) a. > n k. Q 41 ^ 0 oca Li »I 4) M 41 X C (B w < G a. v 1 m M ! Si 118 swe Table 16 TOTAL AND SOLUBLE HEAVY
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 2.
1986-10-01
contaminatioa. Details of the data base received daily over a lifetime. For non - feeding studies on experimental used in these projections for each of...might be generated experimentally for a evaluation of the health effects of the highest no-observed-adverse-effect-level non -carcinogenic end-point of...8217 HARDFILL: Disposal sites receiving construction debris, wood, miscellaneous spoil material. HARM: Hazard Assessment Rating Methodology HAZARDOUS
1986-06-01
63’ Reference Date Tinx- Point Elevation: Drilling Started:11/8/84 1330hrs Drillinz Cornpleted:11/12/84 1100 Site Sketch Waer Leel: 13.5’ 11/9/84 0900...Box 1401 TELEPHONE (302) 736 4761I DOVER. DELAWARE 1 9903 I MEMORANDUM 3 TO: Mr. Kevin Burdette FROM: Philip J. Cherry’j DATE: October 22, 1984 The
Installation Restoration Program. Phase 1. Records Search, Scott AFB, Illinois
1985-04-01
mission of defense of the United States, has long been engaged in a wide variety of opera- tions dealing with toxic and hazardous materials. Federal...Histopathology-Cytology Sewer Dental Clinic/Laboratory 1680 Yes Yes DPDO, Sanitary Sewer, Medical Logistics Radiology/X-Ray 1680 Yes Yes DPDO, Sanitary...disintegrate. HALOGEN: The class of chemical elements including fluorine , chlorine, i bromine, and iodine. HALON 1211: A fire extinguishing agent
Installation Restoration Program. Phase 1: Records Search, Sheppard AFB, Texas
1984-02-01
Environmental Response, Compensation, and Liability Act (CIERA) of 1980, by Executive Order 12316, and 40 Ci 300 Subpart F (National Contingency Plan). CCLA...hensive Environmental Response, Compensation, and Liability Act of 1980 (CURCLA). A potentially hazardous waste is one which is suspected of being...site for agricultural purposes to prevent food chain contamination. Silvicultural use Restrict the use of the site for silvi- cultural uses (root
Installation Restoration Program. Phase II. Confirmation/Quantification Stage I.
1986-02-24
Drilling and sampling three...borings at Site 8; o Drilling and sampling three borings at Site 11; and o Drilling and sampling three borings at Site 12. The ground water samples...8217-"~~~~~~.."." . " -’ - . .. . ;’ "..-. ’,"",,.- - -".-" - ’ -- -... ... ~ -. . ... ... " " 1 *. Sites Recommended Action Rationale U 8 Drill and sample one background To estimate
Installation Restoration Program. Phase I. Records Search, Vance Air Force Base, Oklahoma.
1984-07-01
cadmium , and descaling solutions. The general trend in waste disposal over the years since VAFB first began operation has been from 3 largely unsegregated...generated at the jet engine shop and metal plating shops and consists of phosphoric acid, chromic acid, potassium permanganate, cadmium , and descaling...benzene, MIBK, carbon tetrachloride, MEK, methylene chloride, and acetone. The metal analytes should include cadmium , chromium, copper, iron, lead
Installation Restoration Program. Phase I: Records Search Goodfellow Air Force Base, Texas.
1985-03-01
CHDRO - ARSENIC SARIUM, CADMIUM MIUM. COPPER. IRON, DIS- DIS- DIS- DIS- DIS- DIS- SOLVED SOLVED SOLVED SOLVED SOLVED SOLVED TIME (UOIL (UCIL (UGIL (UG/L... cadmium , chromium, copper, iron, lead, manganese, mercury, nickel, silver, and zinc. The recommended parameters include those compounds known or...8217. ... . . -. * -:,-..’... .... ’.... ...’. .’..".-... ... -......- . ..............-............... . ..... .. APPENDIX A (Continued, Page 2 of 7) Cadmium A metal used in batteries and other industrial
1986-03-21
Firm hazardous waste contamination investigations in Utah and Colorado . o Conducted ground and surface water sampling for Durango S UMTRAP (Uranium...BASE COLORADO DAMES & MOORE 1550 NORTHWEST HIGHWAY PARK RIDGE, ILLINOIS 60068 MARCH 21, 1986 FINAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...FOR BUCKIEY AIR NATIONAL GUARD BASE COLORADO HEADQUARTERS AIR NATIONAL GUARD COMMAND SURGEON’S OFFICE (ANGSC/SGB) BIOENVIRONMENTAL ENGINEERING
Installation Restoration Program. Phase 1: Records Search, Beale AFB, California
1984-04-25
following reasons: (1) to provide the continued protaction of human health, welfare, and the environment; (2) to insure that the migration c:-. potential...Education B.S. in Biology (magna cum laude), 1975, Stetson University, Deland, Florida Ph.D. in Ecology, 1982, State University of New York, Stony Brook...ecology, entomology, plant ecology, population bio- logy, genetics, and general biology . Developed and coordinated laboratory and field exercises
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This a continuation of the Installation Restoration Program, Site Investigation Report IRP Sites No. 1, No. 2 and No. 3 at the New York Air National Guard, Roslyn, New York. The soil boring logs are presented.
Installation Restoration Program Phase 1: Records Search of Hanscom Air Force Base, Massachusetts
1984-08-01
Engineer o Kevin R. Boyer, P.E., Project Manager and Civil Engineer o Alfred N. Wickline, Records Search Team Leader and Soil Scientist o Claudia A...INVESTIGATION TEAM :I.., 44. ’m4, Use or disclosure of proposal data is subject to the restriction on the Title page of this Proposal. KEVIN R... KEVIN R. BOYER, P.E. Page 2 of 3 While working under the USEPA’s Field Investigation Team (FIT) program, Mr. Boyer was part of a quality assurance (QA
1984-08-01
10 31984 . PREPARED FOR UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY BROOKS AIR FORCE BASE, TEXAS 78235 ,,c.’p! ed di...Force August 1984 Occupational and Environmental Health Laboratory I3 NUMBER OF PAGES Aerospace Medical Division (AFSC) 249 total pages• ~~Brooks Air...PROGRAM BACKGROUND i-I 1.2 FACILITY HISTORY 1-3 1.3 DISPOSAL SITE DESCRIPTIONS 1-b 1.4 PROJECT STAFF 1-20 2.0 ENVIRONMENTAL SETTING 2-1 2.1 METEOROLOGY 2-1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is the continuation of the Installation Restoration Program Site Investigation report IRP Sites No. 1, No. 2, and No. 3 at the Air National Guard, Roslyn, New York. The chemical analyses results for soil and ground water samples is reported.
Installation Restoration Program. Phase II. Confirmation McClellan AFB, California. Volume 2.
1983-06-01
ARM SYSTE . Hazard Assesment Rating Methodology. HEAD. Height of the free surface of fluid above any point in a hydrau- lic...pest/herb/metals) previous sample was insuf- 1 gallon bottle ficient. Hydrocarbons were (GC/NS) on top of water surface , I VDA bottle about 1/2 inch... surface . Water became 1 quart polyeth- silty during bailing. Samples ylene bottle waere obtained using the glass/ (cyanide) Teflon sampler. Both the
Installation Restoration Program. Phase I. Records Search, Hancock Field, New York.
1982-07-01
purplish red, red, gray, green or black shale (major fraction) and shaly dolomite (minor fraction). The unit is poorly stra- tified and reaches a... fractured and jointed locally. At Hancock Field, the Vernon is typically overlain by a thin layer of glacial till. Test borings advanced at the Semi...the consolidated rock aquifer, composed of shales and dolomitic shales of the previously described Vernon Formation. Water is contained in this unit
1987-12-01
mineralogy and igneous petrology . Consultant to Shield Energy. Inc.; performed mudlogging and well site geology duties on 4,670’ wildcat weil in...Taylor County, Texas. Evaluated prospects for hydrocarbon potential. Prepared geologic reports for drilling prospectus. Geologist, Wold Minerals...Exploration Company; conducted geologic and geophysi- cal mapping in Precambrian metamorphic terrain of West Texas for talc depos- its. Supervised the drilling
Installation Restoration Program. Phase 1, Records Search. Chanute AFB, Illinois
1983-12-01
Ogle County in northern Illinois to Wabash County in the southeast part of the state. It occurs approximately two miles west of Chanute Air Force Base...AFB) Station I Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury Nickel Silver Date COD Grease (*) Phosphorus (50)* (1000)* (20)* (1000) • (100...MONITORING DATA SALT FORK CREEK BEFORE TRIBUTARY CONFLUENCE (Before Entering Chanute APB) Station 2 Oil & Ammonia Cadmium Chromium Copper Iron Lead Mercury
Installation Restoration Program. Phase 1. Records Search. Air Force Plant Number 3, Tulsa, Oklahoma
1983-12-01
treatment plant was designed for cyanide and chromium treat- ment. Wastes are collected in two separate sewer systems; acid-chrome, and alkali cyanide...reduction of hexavalent chrome to trivalent chrome with sulfur dioxide. After the oxidation and reduction are accomplished separately, the wastes are...uses of the water. CCNVEPSI N COATING WASTE: Acidic solution containinq chromium . 0COOLANT: An oil-water mixture used for coolina metal parts durirq
Installation Restoration Program. Phase 1: Records Search, Williams AFB, Arizona
1984-02-01
Minimum 4.5 Trace substances, maximum -. allowable limits, (mg/1) Arsenic 2.00 Boron 1.00 Cadmium 0.05 Chromium (hexavalent and trivalent ) 1.00 Copper...located in Building 32. Chromium , cadmium, and copper electroplating operations were conducted in a temporary building, T-31 . Paint stripping was... chromium plating wastes. The paint separator receives wastes from paint stri.pping operations that are performed in Buildings 25 and 1086. It also
Installation Restoration Program. Phase 1. Records Search, Lackland AFB, Texas
1985-02-01
governmental environ- mental projects. Environmental Engineering Department Head (1973-1976). Supervised staff involved in auditing environmental practices...V. -4 a a ; to- w w M, 4-. c* a a M - ~ a -- ~= a a a a a aa as-au ’- aC aCca - ~~~ - aa:0 a 0 24 X4 JU 2 a -- a. -~a - .wZ 2kD.4 4 ob0 m C C w 4a
Installation Restoration Program. Phase 1 - Records Search, Homestead AFB, Florida
1983-08-01
con- ducted on a weekly basis. Since the early 1970’s, water and Aqueous . Film Forming Foam ( AFFF ) have been the main extinguishing agents used. Fuels...were occasionally disposed of at the site. Typically, water and AFFF were used as fire extinguishing agents. The site received a HARM score of 66. This...project activities include designs for Owens-Corning Fiberglas; 36,000 gpm neutralization facilities for FC Corporation; wastewater reclamation facilities
Installation Restoration Program. Phase I. Records Search, Reese, AFB, Texas.
1984-06-01
engineering in flue - gas desulfurization plants, and corrosion asaessinnto of hazardous waste handling systems. Mr. Ellis is or has been an active participant...provean to evaluate lime- stones as wet scrubbers in flue gas desulfurisatios (VS) system. She vas task leader for the chemical ad physical analysis...11109163A-15 Debra L. lichmann PUBLIC&TIOUSIlEPOITS: lichmann, D.L., K.V. Luke, end J.C. Terry, " Flue Gas Desulfurization Chemistry Studies
1987-02-20
Bacteriology; 8 years professional experience; served as Project Health and Safety Officer. 1-37 o Duane R. Boline - Ph.D. in Analytical Chemistry ; M.S. in... Chemistry ; B.S.E. in Physical Science; 18 years professional experience; served as Project Quality Assurance Officer. Complete biographical data...University, 1962 M.S., Chemistry , Einporia State University 1965 Ph.D., Analytical Chemistry , Kansas State University, 1975
Installation Restoration Program. Phase 2. Confirmation, Edwards AFB, California
1982-09-01
aquifer boundaries has created unique hydrological conditions, with fluctuating water levels and continuously changing regimes of confinement...wells, resulting in changes in the regional gradien,ý from north to south. Figure 2.3 shows the groundwater table contours as of 1979 (U.S.G.S., 1980...of 11 inches. The maximum mean monthly rainfall occurs in February with about 0.5 inch in one day (Envirodyne Engineers, Inc., 1981). In arid climates
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wittpenn, Nancy A.
2004-07-09
This project proposes to restore tidal connection between the Columbia River Estuary and Blind Slough through the replacement and/or installation of culverts, installation of water control devices, breaching of dikes, and channel enhancement. These enhancements would restore connectivity to approximately ten (10) miles of slough channels previously isolated from tidal influence due to dikes, road crossings, and constrained culverts.
Installation Restoration Program. Phase 1. Records Search Wake Island Airfield
1984-09-01
serviced transient Air Force aircraft at Wake Island. Detachments of the 6486th Air Base Wing (predecessor organization *of the 15th Air Base Wing...following groups: " o Base Operations o Transportation Division o Civil Engineering Division . Air Force facilities were located east of the 1700...since these materials were shipped to the base on barges. The contrac- tors also took waste oil from the Air . Force for use in their vehicles and
Installation Restoration Program. Phase I. Records Search, Plattsburgh AFB, New York
1985-04-01
Storage Area (WSA) drainage to the Salmon River, the POL and housing area drainage to Lake Champlaln, and the golf course streams and ponds drain...Sanitary Engineering; 2. Michael A. Zapkln, Project Director, M. Eng. Environmental Engineering and M.S. Biology - Team Chief and Ecologlst; 3. Andrew...college courses were offered to World War II veterans. This center became part of the State University system in 1950 and was known as Champlain College
1982-09-01
Buffalo and Gramma grasses. The only native trees are plains cottonwood and some willows. Many introduced species exist at Buckley, including Bluegrass...irrigation purposes. The upper sec- tion of the aquifer is unsaturated. - No rare or endangered species of plants or wildlife are found at Buckley...was then made, based upon all of the above information and utilizing the decision tree shown in Figure 4.1, concerning the existence of potential for
Installation Restoration Program, Phase I: Records Search, Laughlin Air Force Base, Texas.
1985-03-01
and chemical * cleaning shops and consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The general trend in waste...0.016 Cadmium ɘ.010 mg/1 ɘ.010 Chromium 0.091 mg/l ɘ.050 Source: LAFB BES, 1984. STP Analysis Results, April 23, 1984. 3-33 -r --r - - - - 41 . N...consists of chromic acid, potassium permanganate, cadmium , and descaling solutions. The fire suppressants currently employed at LAFB and EPAux are AFFF
1988-07-22
Inc. of Savannah, Georgia and Tallahassee, Florida provided analytical services. Michael Newberry, Captain USAF, and Jeff Mason, 2d LT., USAF, from...2803-19 AG AP6 ST;- ES Ci eit 2803-20 A? APC S -2 ES 23033-23 AG .AF6 SD-S 2803-22 AC AP6 SD-4 E.> PARAMIETER 280u- .y 2&u r 23-2: 2803-22 Bezo (g.h.1
Installation Restoration Program, Phase 1. Records Search, Wheeler Air Force Base, Oahu, Hawaii
1983-07-01
the 3vegetation was already exotic, consisting of trees such as guava , koa haole, eucalyptus and silver oak, and shrubs and 3 grasses including lantana...Alkalioo Soap 5 gal GrounOd S~r Of f Base Fire Pit fir.Pit Of f Base PmecI" CoCAClo 20$ P 680 1S Sa.L Cro-..d tAint 10-20 gal 8w L..dt±u Off km. Thinmar
Installation Restoration Program Phase 2. Confirmation/Quantification Stage 2.
1988-04-03
MOORE STANDARD OPERATING PROCEDURES WORK PRACTICES 1. Smoking, eating, drinking, and chewing tobacco are prohibited in the contaminated or...meter and detector are transported in a protective foam-lined case. The cell is tested before going into the field using the test feature and is...available prior to the start-up of field work, the 1"o1l ,ii . rvicts, materials, work space, and items of equipment to zu F.Vft. the nt1 tor
1988-08-01
control data (lat tarK., lab spikes, and lab duplicates) in the report , as well as field quality control data. j. For those metiods which employ gas ...FORCE BASE, TEXAS 78235-5501 NOTICE This report has been prepared for the United States Air Force by Environmental Science and Engineering , Inc. (ESE...testing, field sampling, contamination assessment report preparation, and recommendations for remedial actions. U.S. Army Toxic and Hazardous Materials
1987-08-01
total recoverable trivalent - ambient water, the estimated level is 2 more sensitive than those tested. No chromium the avallabe data indicate - mg/L...freshwater aquatic chronic toxicity of trivalent chromium to life occurs at concentrations as low as sensitive saltwater aquatic life...epoxide Lindane Nethoxyohlor Diazinon Malathion Parathion Toxaphene 2.4- 2,A.5-T 2,JI,5-TP (silvex) barsenic barium cadmiumn chromium (total). copper Iron
Installation Restoration Program. Phase 1. Records Search, Lowry AFB, Colorado
1983-08-01
donated to the * Federal Government by the City and County of Denver. By 1940, two hang- , ers had been constructed . Nine hundred and sixty adjoining...facility was under construccion . In 1958, preparation for the Titan I Missile began with the activa- tion of the 703rd Strategic Missile Wing at Lowry AFB...last T-29 departed from Lowry AFB, ending Lowry’s years as an active flying base. * . Since 1966 significant construction of dormatories and offices
1984-10-01
contamination resulting from previous waste disposal practices at Hancock Field .. o Recommend measures to mitigate adverse impacts at identified...best well to use in judging water quality impacts caused by the disposal activities. Slug tests (Hvorslev, 1951) were performed at each of the four... impact future samplings because this water will probably become mixed in the aquifer before the next sample round and if some remains . near the well
1988-04-01
epidemiological studies ; pending resolution of essentiality in human diet; EPA has not regulated arsenic as a carcinogen in drinking water 3ICadmium B1...Probable human carcinogen based upon sufficient evidence in epidemiological studies ; not regulated as a carcinogen in drinking water because there is...Carcinogenic in animal studies ; because of the extensive negative epidemiological evidence, EPA has proposed to regu- late lead in drinking water based on
Installation Restoration Program. Phase I. Records Search Columbus Air force Base, Mississippi.
1985-04-01
with the river flood plains and pine plantations on drier upland areas. Loblolly pine ( Pinus taeda) is the dominant planted pine and is used for pulp...Maintenance MCL maximum contaminant level Methyl ethyl ketone A solvent used in paint thinner, stripper, and a (MEK) wide variety of industrial...l milligrams per liter A-3 Methyl isobutyl A solvent used in paint stripper, thinner, and a - ketone (MIBK) wide variety of industrial applications
1992-08-07
AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is a continuation of the Installation Restoration Program site investigation report for IRP Sites No. 1, No. 2 and No. 3 at the Air National Guard, Rosyln, New York. The Sample Delivery Group (SDG) narratives and quality assurance/quality control analytical results of eighteen samples are reported.
Installation Restoration Program Phase 2. Confirmation/Quantification. Stage 1. Volume 1.
1986-10-10
FIGUR 1- EEA LNO EFIG I AiNLanfl GUARD BASESHOWING PHSE II INVTIGTOIE I 1- ........ Site No. - I MAA Site No.Northwest Landfill TS Site.No.4 West...Protective Steel PVC Cap Flush Mount in Casing Plastic Nelson Valve Box Land Surface PVC Cap . Cement Grout 0 L n aBentonite Pellet 4" Diameter Seal...12.0 feet BLS. Clays of high plasticity predominate in all three wells. No sand lenses were encountered and the topsoil at all three well locations is
1986-01-24
at F7PTA, 3) old AVGAS distribution system at LFSA, and 4) southwest drainage system. Magnetic anomalies (buried drums) were identified at the...identified magnetic anomalies (buried metals) and determine whether any are pesticide drums or cans - Dispose of excavated material in an appropriate...intervals. The survey was hindered by the presence of three large iron warning signs at the site. These signs created a large magnetic anomaly in the
1984-09-21
O’Flaherty, R.W. Greiling, and B.J. Morson. A-2 [ . . . . . . .. _ . . . . . . . . . . .. ... . . . . DAVID W. ABBOTT EDUCATION University of Puget Sound , B.S...discovery of the largest aquifer system heretofor discovered in Kitsap County and perhaps in the Puget Sound lowlands. e City of Ellensburg, Washington...is a lead author of a report ’Dr EPA Region X in which she iden- tified major water uses within designated subregions of Puget Sound which could be
1984-10-01
Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agriculture Tennessee State Game & Fish Commission...FIGURE 34 oa LU a U. ww COOI w LU z 000 Z00 0 z 3-2. ES NGIEERIG-SCENC S° drain AEDC. Hunt and Huckleberry Creeks drain northward toward the Little ...Investigations DET 816 (AFOSI) Volunteer Girl Scouts Boy Scouts, Elk River District U.S. Department of Agricultrue Tennessee State Game & Fish Commission
Installation Restoration Program. Phase II. Confirmation/Quantification. Stage 1.
1987-01-09
Colorado and is surrounded by the cities of Denver and Aurora . The base is situated on the western edge of the Great Plains physiographic province in a...either the Denver Water Board or the City of Aurora . Lowry AFB is served by the Denver Water Board. Even though domestic water is available to all homes... Aurora in the northeastern quadrant of Colorado (Plate 2). The base was established in August 1937 on the site of the Agnes Phipps Memorial Sanitarium
1985-09-01
Special Olt 9-; ~ ~ ~ ~ ~ J -..-- w--- ’- V - V --y a - . . . . . . RADIAN APPENDIX A Definitions, Nomenclatures and Units A- i . -- 5. . -, - - STAGED...contaminatg ed 11 a thei±r~ iMei S-t.r-roundlin. Review the u f -r Ai Force investigationa. These *r-esu I.ts shall~ I & prvie une eatcvr B-5 -9 V q M I ...results or highly complicated nonlinear mathematical modeling , should * be precise, clear and technically defendable. This section should clearly
1987-05-01
Maintarer.e ground water 2 scil borinF 8 hand auger 12 Disna:-e Area No. 10 (DA-10) - Entomology Bldg UO soil boring 6 13 Landfil: Nc. 1 (LF-1) ground...l’JSZIL I ’ SCIL SO V ; 7 ILill ( oi[ ;Q0 SO IL. $;I 60 . *O (3 .1 *, W i ; Q,. t.t WLi it hI OX aoPit IV 3 ’ Table F-1 (Cont.) 6OIOOtO LAB WPLIAT
1984-12-01
coupled with the enactment of environmental legislation at the Federal, state, and local levels of government , has required action to be taken to... governing the disposal of hazardous waste is the Resource Conservation and Recovery Act (RCRA), as amended. Under Section 6003 of the Act, Federal agencies...disposal sites and make information available to requesting agencies. To assure compliance with these hazardous waste regulations, DoD issued Defense
1985-12-01
Confirmation/Quantification. Moody AFB- GA _____ S12. PERSONAL AUTHOR(S) .. ’ Steinberg J.A. and Thiess, W.G. 13.& TYPE OF REPORT 13b. TIME COVERED 14I. DATE...2.3.2 Soils On the high ground western portion of the base, the surface soils are mostly in the Tifton series. The soil profile consists of about 2 to...Florida Department of Environmental Regulation FWQS Florida Water Quality Standards gpd Gallons per day gpm Gallons per minute GC Gas chromatograph
1986-10-06
surface geophyjcal sur’.-y using electrical recistivity and magnetometer to delineate the buried -renche , to prove the e zist nc./ae~ neme. of b~r...Department of Energy’s garbage-to-gas proof of concept facility at Pompano Beach, Florida. As Co-investigator conducting Bacterial and Trace Organic...advised the bacteri - ological analyst on techniques for identification and quantitation of environmentally important bacteria. 1984-1985 Chem-Technics, Inc
1986-06-10
Environmental Research Group (ERG) Laboratories of Ann Arbor, Michigan, and a duplicate set sent to OEHL’s laboratory in San Antonio, Texas. The remainder of...sites and well clusters , and the overall sparsity of data points at the base, a water table aquifer potentiometric surface map for the entire base could...L _ MW2-34 The predominant solid wastes disposed at this site were paper and domestic refuse, old wood from demolished structures, general
Installation Restoration Program. Phase I: Records Search Minot Air Force Base, North Dakota.
1984-12-01
MAFB and Grand Forks AFB. This move localized command along with •. •• insuring that assigned units would be capable of conducting aerial...were realigned !•;>•’ to become members of the 57th AD. Also on May 1, Grand Forks AFB was \\.•/ assigned to the 4th AD at F.E. Warren AFB, Wyoming...potential for vertical - - stratification of possible ground water contaminants. During drilling, Shelby tube samples should be taken to provide soils
1988-11-01
Biochem., 46, 200-208 (1972). Walter, R. L., Willis, R. D., Gutknecht, W. F., and Joyce, J. M. "An- alysis of Biological, Clinical and Environmental...Constituents (POHC) Measurements during Hazardous Waste Trial Burn Tests," Journal of the Air Pollution Control Association, 35(2), 143-147, rebruaryI 99...to June 1975. University of Virginia. Medical Technologist, Student Health Center. Performed various clinical laboratory tests, such as complete
Installation Restoration Program. Phase I. Records. Loring AFB, Maine.
1984-01-01
forest, mixed forest, forested bogs, streams, and ponds. Managed timber lands total 4,635 acres on Loring AFB. Major harvested tree species include...Habitat 111-22 2. Threatened and Endangered Species 111-23 IV. FINDINGS IV-1 A. Activity Review IV-l 1. Industrial Waste Disposal Practices IV-1 2...Site No. 13, the BX Service Station, a number of cedar trees in the area of the fuel-saturated soil appear to have been dead for several years. 3
1987-10-01
discharged from these wells was containerized and transported to the base oil separator plant for treatment. It is estimated that approximately 25 percent...and 29). The fly ash is probably associated with the power plant tc the west of the Bulk Fuel Storage Area. Just below the fill, at 13 to 15 feet, is...been widely used in petroleum refineries and fuel terminals in response to similar spill impact situations. Although the collect ion/recov- ery
1984-10-01
risk level.derive human health criteria. Most evaluation and synthesis. Scientific SurmyofteJlrc &2criteria are based solely on exposure judg~~nt was...State drinking water and human health standards, criteria, and guidelines applica- ble in the State of New Jersey. On November 28, 1980, the U.S...established recommended maximum concentrations for acute and chronic exposure to these pollutants by both humans and aquatic life. The derivation of these
1988-11-01
Light gray NB, clayey (kaolin). Poetv al - quartz mad to fine sand, mod. (0 Locking Cap plastic , saturated. 3 COMPILED BY B. Painter (EWM) t DATE 11-21...Painter (EUM) -SAMPLE PNTAINSOIL DESCRIIPTION COMMENTS ZTEST NAME. GRADATION OR PLASTICITY ,. DEPTH Of CASING, W ~ 1NPARTICLE SIZE DISTRIBUTION. COLOR...L. Grayish orange 10 YR 7/4. quart. RNDEVAI: very tine Sandy clay, dense, DIAMETER: 2-inrh Srhe So PVC moderately plastics dry. DEPTH: 2 - fenot[ 1
1986-06-01
l C. Review of Weston’s Report .................. IV-8 D. Critical Habitats /Endangered or Threatened Species ....... IV-13 V. CONCLUSIONS...Critical Habitats /Endangered or Threatened Species Discussions with personnel from the Kansas Department of Natural Resources disclosed that there are no...Reticulated Giraffe . This area is upgradient of the base and several miles distant, so it is not thought that the area is affected by past or present
1986-06-15
to their respective areas in the basin to 30 metres at Feather River near Marysville and 15 metres on tributaries to the Feather and Sacra- mento ...Overlain by Arroyo Seco gravels mento Valley. south of the American River. Thickness approxi- mately 100 metres and possibly up to 300 metres along...Communications with personnel from the U.S. Bureau of Reclamation Office in Sacra- mento , however, indicate that there are no major breaches in the
1984-10-01
resulting from previous waste disposal practices at Hancock Field o Recommend measures to mitigatc, adverse impacts at identified contaminated areas o...well GW-8 is downgradient of both disposal sites and this will be the best well to use in judging water quality impacts caused by the disposal...groundwater quality and quantity samples. The amount of water added to each well was in the order of 2 to 4 gallons. This should not adversely impact
1988-04-01
drainageways collect surface runoff at the plant and channel the water off plant property. These are: the Central Drain- age Ditch, the Magazine Ditch, and...past, this drain- age system collected test area deluge waters , small spills from test- ing areas, and drainage from around the flush and maintenance...Drain- age Ditch Table 4-2 shows the results of the analyses of two water samples and one soil/sediment sample that were obtained from the drainage from
1984-12-01
Air F~yeb o et or Departmeri1 of Defense Copies of 0tis repon may be purchased from3 National Technical Information Service 5285 Porn Roya’ Road...squirrels and skunks. Raccoons and abert squirrel popula- tions are stable, and beaver populations are declining. Black-tailed prairie dogs and jack...on prairie dog towns, which are not found on the Academy site today. Prairie falcons are rare on the base. Two eyries with four to six birds are
1982-12-01
Base 6-26 17 Confirmation Stage Soil PCB Data, Building 112, Griffiss Air Force Base 6-27 18 Analysis of Roof and Oil Samples Building 112, Griffiss...Chlordane Application 46 52 (14) Drywell, Building 219 46 36 (14) PCB Spill at Floyd 46 47 17 Hazardous Waste Storage Area, Lot 69 38 47 18 Waste Oil ...specific anions, oil and grease, pH, and specific conductance. * Prepare a field investigations report delineating the nature and magnitude of
Installation Restoration Program. Phase I. Records Search, Brooks AFB, Texas
1985-03-01
decay of the cadavers occurred. The waste was packaged in plastic bags, placed in seven 55-gallon drums and buried in a hole 7 to 8 feet deep. The drums...Receptors subscore (I x factor score subtotal/maximm score subtotal) 44 - II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity...subtotal) 44 II. WASTE CARACTERISTICS A. Select the factor score based on the estimated quantity, the degree of hazard, and the confidence level of the
Installation Restoration Program. Phase 1. Records Search Andrews AFB. Maryland
1985-06-01
red to silvery-qrey, functions ma a conf ining bed. Formation. ~Va plastics thin lonses of pole gray silt. Ann"a Formation. ye (0-210 sand, qrsenieh...the Nanjemoy Formation (a clayey glauconi- tic sand, two to thirty feet thick) and the Marlboro Clay (a plastic clay with silt partings, two to... plastics , empty 55-gallon drums, waste lumber, tires, pipes, and hospital wastes such as unused needles and chemical reagents. In the past, Site D-4 was
1985-08-09
chemicals from the sample, thereby preventing any effects on sample chemistry and cross-contamination of subsequent samples. The laboratory quality...14 Top 3011 4 16 1 Ca 1 ch4DChief ’aquifer (water-ticurinr 16 69 53 i Lrowm clay fo.mation) L 69 1 74 5 . atar oaandand ,ravei from..0.to .750. 74 1 127...significant fraction of the Chemistry Department’s work involves data processing. Mathematical models, based upon analysis of standard solutions or
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
A Problem Confirmation Study was performed at three sites on Mather AFB identified in the Phase I investigation as requiring further study (the Air command and warning Area, the 7100 Area, the West Ditch) and the Northeast Perimeter. The field investigation was conducted from February 1984 to June 1985 and included installation of 11 monitor wells, collection of groundwater samples from the monitor wells and 15 base production wells, and collection of sediment samples from two locations on the West Ditch. Analytes included oil and grease, TOC, volatile organic compounds (VOA), as well as dimethylnitrosamine, phenols, pesticides, and dissolved metalsmore » at some specific sites. Based on the hydrogeologic complexity of the physical setting and the findings of the sampling and analytical work, follow-on investigations were recommended at all three sites.« less
1986-06-01
SAC Strategic Air Command sedimentary Describes rocks resulting from aepo- sition of transported material that has accumulated in layers semi-confined...provided in a separately bound appendix to the draft final report. L. Meetings The contractor’s project leader shall attend two meetings, to be he_...I ’~’UO’’ I. - P P I--D Q P22PPP~b ~QPZ _’P- bPP ?Pf tnN -7-p (1)N Ir-J -1 0 (D u-iU v u AD-A184 581 INSI~A LLATION HISTORATI ON PRO ~AM PHASE 2 7CON
1983-12-01
STATEMN’T L * N N 0UNCE D J UST I IICATION T DI Sr 141I IIIT ION / AVAII.ABII flV CODES )SFRIKB-T.OS AVAr.Aa[Ll-Y ANOi SPECIAL ePI A /DIST RIUTION STAMP...Storage Area No. 3 I C-3 Analytical Results for the Soil Sample Taken in the North Parking Lot APPENDIX D PHOTiOGRAPiS APPENDIX E USAF INSTALLATION...1970’s-1981 54 Storage No. 4 5 Underground Cyanide Mid 1950’s to La te 1970’s 51 I Vault i I 1 I I I FIGURE 1 00 z IWO zZi II : 0C OJ IL W z D 0j I co
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nashold, B.; Rosenblatt, D.; Hau, J.
This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations.« less
1981-10-01
Geography 3-1 Topography 3-. Drainage 3-1 ii Page Surface Geology 3-3 Barrier Sediments 3-3 Myrtle Beach Backbarrier Sediments 3-3 soils 3-5 Subsurface...Beach AFB Surface Drainage and Surface Water Sampling Points 3-2 3.2 Myrtle Beach AFB Surface Soils 3-4 3.3 Myrtle Beach AFB Location of Geologic Cross...has created a potential contamination problem. This situation is compounded by the site’s sandy soil and shallow ground water table. b.) Weathering Pit
Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1. Volume 1.
1987-04-29
Dichlorobenzene 4000.0 U.S. EPA estimate of safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). (2... Plastic bottle 40C 500 ml TOC Glass bottle 40 C; H 2 So4 to pHɚ 250 al Metals Plastic bottle HNO3 to pHɚ 500 ml Volatile organics Glass vial with 40C... safe levels of toxicants in drinking water for human health effects (Federal Register. 28 November 1980). 4-3 TABLE 4-2. REGULATORY GUIDELINES OR
1980-11-01
hr incineration rate are presented in Table 15. These costs include dredging equipment, flat bed trailer and afterburners and venturi scrubbers where...require further treatment before they can be released into the environment, i.e. biological degradation for the liquid and specific scrubbers for the...The wet-air units are equipped with wet scrubbers to remove air emissions. Air emissions are expected to contain at a minimum CO, C0 2 ,N2 , 0, and
Installation Restoration Program. Phase 1. Records Search, Kelly AFB, Texas
1982-02-01
1000-1500 gallons per year based on two training sessions per year. The ultimate BOD of AFFF ( FC -780B, manufactured by 3M) is 370,000 mg/l in...Landfill 1917-1942 44 24 FC -i Fire Control Training Area ?-1950’s 42 25 FC -2 Fire Control Training Area 1950’s-1981 41 26 RD-i Radioactive Disposal Area...were buried had very short half-lifes. This site received a low score of 45. 6) Fire Control Training Areas a. The Fire Control Training Areas FC -I and
Installation Restoration Program. Phase 1: Records Search, Blytheville Air Force Base, Arkansas
1985-08-01
AFB LOCATION OFI 0 LS U FC MIDDLE S RA EWATER MARKER MONITORING SITESI SL *LEGEND S SURFACE WATER QUALITY IMONITORING SITEI. iJ I WASTEWATER PLANTr j...burning is scored in a small above ground tank located near the FPTA. The extinguishing agent used during this time period was AFFF (aqueous film...receptors, "aste caracte,stics, and pst .ways. Receptors 54 Waste Char’acteristics 54 Pathways 74 Total 183 div~ied by 3 E ’I 3,’osi : --e E. P
Installation Restoration Program. Phase I: Records Search. Sunnyvale Air Force Station, California
1985-07-01
00 a-l Wa-- jzI0 UJ~ *20- * -J J uSl a J~rL 0 9U * de 0~>a j~ ~ W ’./ IL system was also determined to warrant review and modification under the base...in the HARM scoring system to numerically assess the pollutant transport mechanisms and potential receptors present at the site. App. G describes the...Note: RUTA wll field locatiom am dvou in Fig. 3.4-1. SS (EPA, 1964b). tNI. (EPA, 1984). Notle: pci/i - Picocuries per liter. Sources: UIGAEII, 1978
1987-06-01
Each of these sites involves POL releases, detection of which is amenable to geophysical/geochemi- cal methods . ES-8 I A I A I I I I ~ i I I ii I VN...Precipitation in Columbus, Ohio, averages 36.71 inches per year. By calcu- lating net precipitation according to the method outlined in the Federal Regis- ter...spill absorption devices. Fuel that was not recovered either evaporated, was absorbed into the ground, or entered the base drainage system from the west
1988-04-01
sites throughout Alaska, Idaho , Oregon, and Washington, including work at 10 sites on the National Priorities List. Major geohydrologic investigations...Mary’s Hospital, 5300 Military Rd., Lewiston , 278-4000 Hospital Emergetcy Room Niagara Falls Memorial Medical Center, 621 10th N.F. 278-4000 Poison...Hospital ( Lewiston ): Exit AFP 38; head West on Balmer Road; Turn left and head south on State Highway 18; Turn left on State Highway 104 ( Lewiston Rd
1981-07-01
Disposal Methods 4-31 Evaluation of Past and Present Waste 4-35 Disposal Facilities Landfills 4-35 Dry Wells 4-37 Rating of Waste Disposal Sites 4-37 V 2...Problems Identified at GAPE Landfills 4-36 4.12 Priority Ranking of Potential 4-38 Contamination Sources 4.13 -4.31 Rating Forms for Waste Disposal Sites 4...39 -4-76 5.1 Priority Ranking of Potential Con- 5-2 tamination Sources B.1 Rating Factor System B-2 -B-5 4W EXECUTIVE SUMMARY The Resource
1986-03-24
interbedded sands and silts in5 the lower portion of the profile. The sand units within the caliche are gen- erally pink . quartzose. fine grained and...C1426 I- 0 .J C U-I 0 c 0 o .1. 00 44I -14 u -4 >u~ 0i c FloI ~ -r4 ra t-o 14 co 00 z -4 -t cc ’w4t ibe 4-39 C1426 ~-~-~2 o IL _ Cl) 0*l *IJ. *0 0 00 U.U 0
1988-06-15
equipped with an oil/water separator. Separated oil would be collected for reuse or proper disposal, and water would be piped to the Sewage Treatment...1940’s. The STP is located on Glendale Avenue, approximately 2 miles east of the Main Base, and adjacent to the Agua Fria River as shown in Figure 1-7...flow. The effluent from the STP is discharged into a canal that flows into lagoons in the dry Agua Fria River bed. The treated efflu- ent is routinely
1989-06-01
4) 0) C)-D C 0401 C) 0 -c eL4 CD CD r, r- *,-A (mz61L 00 rC- 4ic 0Cm q) CD) C) -DC DC )C wl ~ ~ ’ %0 0 0 0 koko%04 4 J 4 J I+ C-M 44. 0 4J 44) -) 4...SAC) and 5,6-Dihydro-5-Azacytidine (H5AC) in L1210 Cell Culture Samples by Gas Chromatography (GC) and Mass Spectrometry (MS), C.J. Nielson, S.W
1987-08-01
01 0 4 In w el4 ’ n r fl f4 r, V 0 1" * * * - ~ m ~c- I0 1-0- Q~ 3c 3c~ AdI-. * tp~dip Eu - 4j :: .( - * -U I’ -L - UJ a. Zw a Inc., ɘ L.3. 2-3...swale ap- proximately 100 feet south of Building 222 (Figure 3-7), the Jet Engine Test cell . With the exception of VOC, all param- eters detected at 15-B
1987-09-20
of the two study sites (Appendix D). Common species include the herring and ring-billed gull, mourning dove, tree swallow, chimney swift, purple... Species ................... 111-30 III.G ADJACENT LAND USE .................................... 111-31 III.H SUMMARY OF ENVIRONMENTAL FEATURES...methodology, and a list of acronyms/abbreviations used in this report. 1-4 W- x--WW- -- vqwu UV X DECISION TREE Complete List of Locations/Sites I Evaluation
1985-10-01
bromochioromethane. 2-bromo- 1 - 8.2.3. check standard containing each parameter chloropropane . and 1.4-dichlorobutane is 8&.2 Beginning with Section...Modification 1 (IRP Stage 1 , Otis ANGB) Roy F Weston Attn: Pete Marks Weston Way West Chester PA 19380 1 . The Goverment is contemplating assignment of the...delivery order described in Atch 1 hereto under the subject contract, Pertinent details are included in Atch 1 and herein. Request Contractor
1988-03-01
AFP 59 SW-4 Production Field Blank Water Well Water Hart 004 Water Hart 005 f Hart 007 H.3-13 PRINCETON TESTING LABORATORYI 3v~ zANA -YS--S REDO:’- =I...observations. Enforcing the "buddy system" where appropriate. " Determining and posting locations and routes to medical facili- ties, including...poison control centers; arranging for emergency transportation to medical facilities. " Notifying local public emergency officers, i.e., police and fire
1986-10-01
investigate the environ- mental feasibility of disposing of flue gas desulfurization (FGD) wastes, ash ’’p and sludge, from a mine mouth power plant by...Department of Defense o EMP - Electromagnetic Profiling o EPA - Environmental Protection Agency o GC - Gas Chromatography o GC-MS - Gas Chromatography-Mass...IN ITEM NO.) ADDITION 01 DELETION CODES: 0 -INTERMEDIATE CIRR: CONTROLLED ITEM RPT ROMT AFSC oRM 705 PREVOIJ EOTO’ , RE U C-4 4rsc-Aad.r IF ,,d 0,P E
1985-08-09
and regulations. Additional hazard areas refer to non-regulated operations and/or practices that pose potential risks to human and environmental ...ORGANI1A’iON REPORT NUMPERASE IRP-IIa-AFP6 64 xAfi OF PEROING ORG IS ZArTON Śo 7a.AM OF MONITORING OAYIZAToN Environmental Science ’ aeedwabi.) U.S. Air...Force and Engineering, Inc ca ed AORESS Y. State, And ZIP C017) AOSS Approvetaoe pblic reease; P. Box ESE Occupational and Environmental Gainesville, FL
1987-12-01
d the location documented on a project site map . c. Split all water , sedi:-ent and soil p~ts as -art of the ccntractor’s specific Quality Assurance...regional/site specific hydrcg.volog-y, -]Il And boring logs, data from water level surveys, grcundwater surface and gradient maps , water quality and...COMMAND COMMAND BIOENVIRONMENTAL ENGINEER (AFSC/SGPB) ANDR-WS AIR FORCE BASE, DC 20334-5000 DECEMBER 1987 PREPARED BY RADIAN CORPORATION 8501 MO-PAC
1982-04-01
128 32. Effects of UV, Ozone and UV-Ozone on the Degradation of Pink Water at Zero Flow ............ ................. 130 33. Formation of...Nitrate Ion During UV-Ozonolysis of TNT in Zero Flow Mode ........ ... ........................ ..... 132 34. Detailed Analysis of Run 7-12...the Degradation of Pink Water at Zero Flow* (Layne et al., 1980) *This figure represents a combination of Figures 5 and 7 in the report. 130 - -+ TNT
1987-05-29
surface soil below the mixing basin at the current Entomology Shop (Building 2560). The concentrations of chlordane found at these two sites is below...surrounding Building No. 440 may have been exposed to pesticide/herbicides from 1965 to 1980 since this site was used to store and mix pesticides used on...ft trench near the three bridges area on Gavin Mandry Road in January 1985. No information is available on what , if anything, was in the drums or when
Information Management for Installation Restoration with Focus on Aberdeen Proving Ground, Maryland
1993-08-01
savings. Edgewood Area Project Background EA has been the site of extensive military munitions testing and disposal for over 70 years. Onsite burial of...titled "Installation Restoration Data Manage- ment Information System" (IRDMIS). This program, begun in 1975, has undergone several updates as technology ...collocated with AEC on EA, Maryland. Data from geotechnical chemical analysis and field survey results are supplied by AEC-authorized contractors and
Umatilla River Subbasin Fish Habitat Improvement Program, 1996-2003 Summary Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Hilaire, Danny R.; Montgomery, Michael; Bailey, Timothy D.
This annual report is in fulfillment of contractual obligations with Bonneville Power Administration (BPA), which is the funding source for the Oregon Department of Fish and Wildlife's (ODFW), Umatilla River Subbasin Fish Habitat Improvement Program (Program). The last Annual Program Report was submitted in 1997, and described projects undertaken in 1995. This report describes Program activities carried out in 2003, along with a summary of projects undertaken during the years 1996 through 2002. The Program works cooperatively with private landowners to develop long-term restoration agreements, under which, passive and active Habitat Improvement Projects are conducted. Historically, projects have included livestockmore » exclusion fencing (passive restoration) to protect riparian habitats, along with the installation of instream structures (active restoration) to address erosion and improve fish habitat. In recent years, the focus of active restoration has shifted to bioengineering treatments and, more recently, to channel re-design and re-construction aimed at improving fish habitat, by restoring stable channel function. This report provides a summary table of past projects (1996-2002), along with a text description of more extensive habitat improvement projects, including: (1) Implementation of a four-phased project on the Lobato property (Birch Creek) beginning in 1996 and involving a demonstration bioengineering site and riparian improvements (fencing, planting), (2) Implementation of stable channel design/instream structure placement on the Houser property, East Birch Creek, beginning in 1998, an (3) Implementation of a joint, US Army Corps of Engineers/ODFW (cost share) project beginning in 2001 on the Brogoitti property, East Birch Creek, which involved implementation of stable channel design/construction and riparian improvement treatments.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What are my requirements to acquire, install, operate, and maintain real and personal property? 86.70 Section 86.70 Wildlife and Fisheries...-WILDLIFE SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Manage Grants...
1980-11-20
PROGRAMS TO CONTROL ENVIRONMENTAL CONTAMINATION FROM PAST ACTIVITIES. * THEN, I WILL PRESENT OUR MAJOR PROGRAM TO IMtPLEMENT WITHIN THE DEPARTMENT OF...OF DOD’S HAZARDOUS WASTE DISPOSAL PROGRAM AND OUR PROGRAM TO ABATE MIGRATION OF CONTAMINANTS FROM DEFENSE INSTALLATIONS. THE INTENSE QUESTIONS FROM THE...INDUSTRY AND MOST OF THE GOVERNMENT. SINCE 1975, DEFENSE HAS HAD ITS INSTALLATION RESTORATION PROGRAM TO ASSESS AND CONTROL ANY POSSIBLE MIGRATION OF
Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa
1983-09-01
installation. Low-lying drainageways on the site are underlain by soils of the Gravity series and of the Wabash -Gravity-Nodaway complex. These soils...Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- -- ’ cadmium batteries (24/year) and sulfuric
1991-05-01
FEASIBILITY STUDIES (RI/FS) ENVIRONMENTAL RESTORATION DIV STAFF MAY 1991 (REPRINT) - Distribution is unlimited; approved for public release ENVIRONMENTAL ...RESTORATION DIVISION (ESR) ENVIRONMENTAL SERVICES OFFICE AIR FORCE CENTER FOR ENVIRONMENTAL EXCELLENCE (AFCEE) BROOKS AIR FORCE BASE, TEXAS S(4 93-05296...Human Systems Division’s Human Systems Program Office, IRP Divisicn (HSD/YAQ) was transferred to the newly formed Air Force Center for Environmental
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Do I need to conduct a survey if I already have a plan for installing tie-up facilities? 86.114 Section 86.114 Wildlife and Fisheries UNITED... SPORT FISH RESTORATION PROGRAM BOATING INFRASTRUCTURE GRANT (BIG) PROGRAM How States Will Complete...
1985-02-20
Surface Cemennt/entonte Grout Rat 20/1 6" Diameter Bore "Ole 8 Foit B.G.S. Bentorito 4" Diameter POes" Schedle 409 Fee S.O.S.PVC Riser Pipe with...Casing with Locking Cap GRiser Pipe StickupGround Surface 2.2Fe Cement/BSentonite Grout Ratio 20/1 8" Diameter Bore Hole cv Ile- 3 Feet B.G.S...Ground Surface 4’. Ground Surface .0~ Cemtert/Bentonlte Grout Rat 20/1 8" Diamneter Bore Hole__ 4" Diameter Pl O Schedule 404 PVC Riser Pipe FetBGS
Installation Restoration Program Phase 1. Records Search. Air Force Plant Number 36, Ohio
1985-07-01
n >:: FVJl «■^h’-. Kn>»p»y!< fc » wi are exposed on the ground surface. On either side of this valley con- solidated rocks of shale and limestone are...Electric Well No. 3A ( 183 feet deep) completed also in 1951 displayed a water mmmmmmmmi m w\\!wü wUWinntnW VW^^^ft ÄW^F^^’Sr...FIGURE 3.8 3-18 ENGINEERING-SCIENCE IM^N^^C^ xmmmmtttK*KWimmx& ■sm^m^ fc ^^^ level of 56 feet. "Hie differences in water levels indicate the
Installation Restoration Program. Phase 1. Records Search, McGuire AFB, New Jersey
1982-11-01
Raritan- Magothy System * 3.12 Log of Base Well OD" 3-23 3.13 Well no. 1 at McGuire Missile Site 3-25 3.14 Base Well Locations 3-26 3.15 Surface Water...in the Potomac-Raritan- Magothy outcrop area has been published. This is not expected to impact base water quality in the near term. o Flooding is not a...Potamac-Raritan- Magothy System (PRM) 3-13 FIGURE 3.7 McGUIRE AFB STANDARD LOG OF McGUIRE PENETRATION. TEST MISSILE SITE I TEST BORING 46 21 DEPTH BELOW
1987-07-01
Raritan Formation and the Magothy Formation. The Raritan Formation, which rests on the bedrock, is subdivided into the Lloyd Sand Member and the clay...member, which is the uppermost part. The Raritan Formation is below sea level. The Magothy Formation outcrops at only a few locations on Long Island...the Magothy , and the Lloyd Sand member of the Raritan Formation. These aquifers are made up of sand and gravel and small amounts of silt and clay
1986-12-11
MMR main gate (see Figure 3.2-1). In those ponds Umbrella-grass (Guirena-pumila) and Hyssop Hedge- nettle (Stachys- hyssopifolia) were found. The other...has conducted research in Buildings 286 and 240. From 1963 to 1969, the lab tested insecticides for private companies. Residuals from the 4...Airport Turf Insecticidal Treatments for Japanese Beetle and European Chafer, Eastern Region. Stahl, Ralph G., Joachim G. Liehr, and Ernst M. Davis. 1984
1985-09-01
combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane , and 10.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop...Smmmmmmmiih EmmmmmmEEmmmiEEhhE/hEEE/hEEI EEEmmmmmmmlmmE mmmEmmEEmmmmEI mmmmEEmmmEEmmI . AN 11 Igo 12. i,11111 1111 IIII1111l 1.2 IlII1.4 11’ .6 1 ...BASE DAYTON, OHIO AIR FORCE SYSTEMS COMMAND HEADQUARTERS AERONAUTICAL SYSTEMS DIVISION WRIGHT-PATTERSON AFB, OHIO 1 AUGU.$ 985 PREPARED BY ROY F
1984-09-11
5 EPA 625 . Endosulfan sulfate wg/L 5 EPA 625 Chlordane pg/L * Toxaphene Pg/L * Acid Extractable Detection Analytical Compound Units Limit Method...ND ND ND ND 4,4’-DDT 5 ND ND ND ND Endosuif an sulfate 5 ND ND ND ND Chlordane* Toxa phene* Detection Acid Extractable Compound Limit M4-2 M4-6 14-9 Ge...Endosulfan sulfate 5 ND ND Chlordane * Toxaphene * Detection Acid Extractable Compound Limit BPM-1 BPM-2 2-Chlorophenol 2 ND ND 2-Nitrophenol 2 ND ND
1986-03-07
8217 CLS7 PA SPOONER ET AL, 87 MAR Big F/G 12 11111g 1.0 03,2 i 1111111L_ MICROCOP RE ION TEST NATtnNAL HURLAIl )IF SIANDAPFrl £, , , 11 11I% AD-A 171 579...North Gate - ’FPT-?\\ Sal) West Gate ,o > e-.? ! •• ai Bouganville \\>°( ,, FigreES-. ocaio of SiesI etgae CE Storagje Compound SP1 SP-7 - FPTA-3...determine the areal sample and analyze for extent of groundwater target compounds identified contamination. in 1-9 (or for volatile organics using EPA
Installation Restoration Program for Eglin AFB, Florida. Phase 2. Field Evaluation
1984-09-01
of t jest l-iianja-erent pra-ct ices w .hien are discussed in Section D.5 5.1.4 Landfill L)-26 In Dotn NoveM( Der and tebruary samplI igs, ioX" results...to analy.ze 6rounawater samp los tronm La’nd ti I v)-ZIt for organional I ides in the base/ neut ral extractaLeI, organics section of the priority...the gasoline tank was not filled near wells or the van and any spillage was allowed to evaporate before moving the pump. During use, the pump was
32 CFR 203.10 - Eligible activities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... reports include, but are not limited to: (i) Installation restoration program site studies, engineering documents, such as site inspections, remedial investigations, feasibility studies, engineering evaluation...
Wide area restoration following biological contamination
NASA Astrophysics Data System (ADS)
Yang, Lynn; Hibbard, Wilthea; Edwards, Donna; Franco, David; Fruetel, Julie; Tucker, Mark; Einfeld, Wayne; Knowlton, Robert; Brown, Gary; Brockmann, John; Greenwalt, Robert; Miles, Robin; Raber, Ellen; Carlsen, Tina; Krauter, Paula; Dillon, Michael; MacQueen, Don; Intrepido, Tony; Hoppes, Bill; Wilson, Wendy; Mancieri, Sav
2008-04-01
Current understanding of how to restore a wide area that has been contaminated following a large biological attack is limited. The Department of Homeland Security and Department of Defense are executing a four-year collaborative program named the Interagency Biological Restoration Demonstration (IBRD) program. This program is aimed at developing technologies, methods, plans and policies necessary to restore a wide area, including military installations and critical infrastructures, in the event of a large outdoor aerosol release of anthrax. The IBRD program partner pilot city is the Seattle Urban Area to include Fort Lewis, WA and McChord Air Force Base. A front-end systems analysis was conducted as part of IBRD, to: 1) assess existing technologies and processes for wide area restoration; from this, 2) develop an "as-is" decision framework for wide area restoration; and 3) identify and prioritize capability gaps. Qualitative assessments and quantitative analyses, including sensitivity, timeline and case study analyses, were conducted to evaluate existing processes and rank capability gaps. This paper describes the approach and results from this front-end systems analysis.
Installation Restoration Program Records Search for Kingsley Field, Oregon.
1982-06-01
Hazardous Assesment Rating Methodology (HARM), is now used for all Air Force IRP studies. To maintain consistency, AFESC had their on-call contractors review...Installation History D. Industrial Facilities E. POL Storage Tanks F. Abandoned Tanks G. Oil/Water Separators :" H. Site Hazard Rating Methodology I. Site...and implementing regulations. The pur- pose of DOD policy is to control the migration of hazardous material contaminants from DOD installations. 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-03-18
The United States Air Force (Air Force) has prepared this Remedial investigation/Feasibility Study (RI/FS) report as part of the Installation Restoration Program (IRP) to present results of RI/FS activities at five sites at the Bullen Point radar installation. The IRP provides for investigating, quantifying, and remediating environmental contamination from past waste management activities at Air Force installations throughout the United States.
1988-03-01
50 BLM - - - in use Oil Well Road 51 63-501 - - - in use 6981st Rec Area Six Mile Lake 52 23-100 166. A 36 in use Golf Course Pro Shop 53 62-145 125...q K, -- p *K. % K.. K.,., ~* K,. .~ A , A .U .AAA.J A A J~...K A. ..A ,.A - . OKIRACoks con 55 ORDER FOR SUPPL) ES OR SERVICES 1 .2 2. PROC...SYC/AGENCY tt.SURV 20. TOTAL AMOUNT~CeNT USE CRIT A. PST a CONRACTADMIN A. ASTU CNTRCT C. ARSTNAC? RECIP 0. SPL CON ? FuEC PAT It KNDN 421 TYPE ASP
1988-11-01
BENZIDINE 400 81)1 5 BENZO (a) ANTHRACENE 400 ODL 6 BENZ0 (a) PYRENE 400 61 )1 7 BENZO (b) FLUORANTHENE 400 61 )1 a BENZO (ghl) PERYLENE 1003 61 )1 9...BENZO (k) FLUIORANTHENE 400 61 )1 10 815 (2-CHOROEThOXY) METHANE 400 81)1 11 815 (2-CHOROETIIYL) ETHER 400 BDL 12 8(5 (2-CHLOROISOPROPYL) ETHER 400 BDL 13...CHOROPHENYL PHENYL ETHER 400 61 )1 18 CHRYSENE 400 B1)L - 19 DIBEIQO (ah) ANTHRACENE 400 81)1 20 1,2-DICHOROBENZENE 400 81)1 21 1 ,3-DICHLOROBENZENE
1986-09-01
0’ - N tT qT -0 t" C-r C-, M z a <CLW 4 0 a. o.CL- C= un z LJJIIr-= r -I CiA c= cot ’ rcli LAJI LUU CLCL LLI- IOUa a. IF LLJLm I-l - ( Cft - 4 CL...Depth Graphic Core Sample Sample Cft ) Log Interval/ID Taken* Lithologic Description 0- .. ~.G TOPSOIL; with some wood and other debris. 5-.~J SB-lA-1 ST...Date Recev 7 T ime~ L Transported By La- aml No. 0,; 0 Comments_____________________ ________ ___ Inclusive Dates of Possession
1988-06-15
Primary Metals: CA Title 2:60 e Arsenic 0.005 mg/L~~ Barium 0.005 mg/LICadmium 0.005 mg/L Chromium 0.01 mg/L Lead 0.05 mg/L Mercury 0.001 mg/L Selenium...analyzed for twelve metals: arsenic (As), barium (Ba), cadmium (Ca), chromium (COr), lead (Pb), mer- cury (Hg), selenium (Se), silver (Ag), iron (Fe...Total Threshold Limit Substnce (mg/L) (mg/Kg) Arsenic 5.0 500 Barium (excludingf barium sulfate) 100 10,000 Cadmium 1.0 100 Chromium VI 5 500 Chromium
1985-07-01
surrogate halocarbons. A 10.2 Calibrate the system daily as Agency. combination of bromochloromethane, described in Section 7. 2-bromo- 1 - chloropropane ...described in Section 7. 2-bromo- 1 - chloropropane , and 0.3 Adjust the purge gas (nitrogen 8.3.2 The laboratory must develop 14-dichlorobutane is...46 UNCLSSIFIED F/G 13/2 UL mhmmhmhohEEEmhI wJI. 1.0S ’, LI U.2..12.2 1 . 111110 MICROCOPY RESOLUION ES CHART""., -6 -’S- . 1 °"°, 5- -i -1.0..-+-’.2,i
Installation Restoration Program. Phase 1 - Records Search, Travis AFB, California
1983-08-01
Personnel Transportation Assistance Office Navy Construction Office (ROICC) Navy Quick Trans CPE Cargo OL-K AFESC/CEMRT OL OH AF Commissary/ FCS Operating Loc...du u U C AS I- z I- < L z Z ’CIA F,.- **z z - C -o -C Z. -2 X.,~a S.. ’ l - x CO I II I EAI IIV I - -. I t1 -1 z In-’S I LA- 0..u 2gU, 0 z u Fc -jIL...used at the site comprised, AFFF , protein foam and water. The site has no berms or dikes to contain the runoff. Surface runoff from the site has to
Installation Restoration Program. Phase 1 - Records Search, Castle AFB, California
1983-10-01
2 WAEEESnm vl-dddwd. ,de~, ~~~~~S.’. 4.. fC . 4h.1 Ff* To n 4w .64w Sim. .23 " -ta. fqU % . V.int i. few I. i& xi & T s - -f - R //5 . " T...iaaPa 1 l] 4 W. 0. 2162 W=L NO. 34-A Atwater District NW* of Section 6-7-13 Drilled by No I.D. December 194 0 - 5 Soil 541 or 18" #14 Ga. Double...Air Force Base. AFESC: Air Force Engineering and Services Center. AFFF : Aqueous Film Forming Foam, a fire extinquishing agent. *APR: Air Force
1987-12-01
Limit Spiked Samale Samole ISailced C" auod R sIus’lt (SSR) esult. (SR) A-dded ( .SA) Iels: I. I 1. A.luminum 75-125 - I Z. Antimony - 3. Arsenic " I...UntKtarix *s %Control Limit Spiked Samale Sample SieiCm.,ound _ _R R esult (SSR) Re t,.- (SR) Added (SA) Z,10 1. AUlunu m 7 I I I 2. Antimonyj ____ 3...No. DATE Lab Sample) ;S4 No Katrix waot, " . n ...Central L imi Spiked Samale Samale Spiked Comnpound M Rsult: (SSR) Result (SR) jAdded (SA) XR
Installation Restoration Program. Phase I. Records Search, Air Force Plant 44, Tucson, Arizona.
1985-10-01
Biographical Data APPENDIX B List of Interviewees and Outside Agency Contacts APPENDIX C Master List of Industrial Shops * APPENDIX D References APPENDIX E AF...Collected by the Tucson Groundwater Contamination Study Task Force * Annual Generator’s Reports and Quarterly Reports from AFP 44 to ADHS. Appendix D ...cn (INcC. iU u u a L- - -2 a 0 0) CL C 1-4~~ ~ r % %- d ’ 00 A to did 1-44 L0 47% 0 z- d Ci - Z ..-i I2-8 00 -4 40 0 -0 0j c 0 Sb. 1.- 41 CL "-4 CLV
Sears Point Tidal Marsh Restoration Project: Phase II
Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase II, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
Sears Point Tidal Marsh Restoration Project: Phase I
Information about the SFBWQP Sears Point Tidal Marsh Restoration Project: Phase I project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
South Bay Salt Pond Restoration, Phase II at Ravenswood
Information about the South Bay Salt Pond Restoration Project: Phase II Construction at Ravenswood, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nashold, B.; Rosenblatt, D.; Hau, J.
1995-08-01
This summary describes a Supplemental Site Inspection (SSI) conducted by Argonne National Laboratory (ANL) at Air Force Plant 59 (AFP 59) in Johnson City, New York. All required data pertaining to this project were entered by ANL into the Air Force-wide Installation Restoration Program Information System (IRPIMS) computer format and submitted to an appropriate authority. The work was sponsored by the United States Air Force as part of its Installation Restoration Program (IRP). Previous studies had revealed the presence of contaminants at the site and identified several potential contaminant sources. Argonne`s study was conducted to answer questions raised by earliermore » investigations. This volume consists of appendices F-Q, which contain the analytical data from the site characterization.« less
South Bay Salt Pond Tidal Wetland Restoration Phase II Planning
Information about the SFBWQP South Bay Salt Pond Tidal Wetland Restoration Phase II Planning project, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic re
76 FR 12629 - Airworthiness Directives; Bombardier, Inc. Model DHC-8-400 Series Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... maintenance program by incorporating Task 320100-211 (repetitive detailed inspections of the retraction... installation, and corrosion) and Task 320100-212 (repetitive restorations of the retraction actuator for...
1981-10-01
Okaloosa Co. 3-12 Crestview South Quadrangle, Florida-Okaloosa Co. -13 Mossy ead Quadrangle, Florida-Walton Co 3-14 E-1 EGUN AFB 4,h aa V, WRAMATIO...I) Um AYPM hIN1DS SP * So". AM T 0 Tou A is a O I. h E-2 ES ENGINEERING -SCIENCE V%777-7NN7 .7-7 EGUN AFB 0.4 .m ... (1) WMg LAN DOSAMU *Y* CO u...r Oumm *p S(S Ann~ Il~~O 0*aAMa 2-3 ES ENGINEER ING - SCIENCE EGUN AFB %Tt MAR ESTHER * : . . - . - ~ - ~ r W R G H T L A N D F I L L 3 SITE 0296
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-10-01
The purpose of this task is to determine if environmental contamination has resulted from waste disposal practices at Otis ANGB MA; to provide estimates of the magnitude and extent of contamination, should contamination be found; to identify potential environmental consequences of migrating pollutants; to identify any additional investigations and their attendant costs necessary to identify the magnitude, extent and direction of movement of discovered contaminants. Partial contents include: well and test pit logs; site safety plan; laboratory analytical methods and quality assurance; and Federal and state drinking water and human health standards applicable in Massachusetts.
1987-02-20
Dnor:)c7i’,orotneane .0i fN D____ __I______ C,-icniorcetnyene 0.10 N:DO.02 ____ ____ ____ I n1 ic o cni e -i - ---ii 1- - - 1 Di c roreae_____...n -c 0a r~e~n’ 0.010 NDɘ.010 _____ --- H I().01-0 1z0 0 c ND 7*, 5 was nUJVC.. ceteize ; the _ _ limit__ of deec iofrhiaalsi i _____ ,a t- s-Ie...PASADENA CALIF 20 FEB 87 U N LASF IE F31615-84-D -448 2 F/G 24/7 M N1 . - 1111_1 % . .- 1511 1*% EncineerinQ Science Page 11 ANALYTICAL RESULTS SUMMARY
1985-08-09
FL UNLSSIFIED C R NEFF ET AL 99 AUG 95 F33615-84-D-4491 F/O 13/2 NLEmhANNE.mmmmhhhhl smhmhhhhmmhhls mhmmhmmhhhhhl...Occupational and Environmental Gainesville, FL 32602-3052 Health Laboratory I Brookq -kir ForrA R"Pn ’’y 1:;~ Sa. NAME OF FUNOINGiSPONSORING 8b. OFFICE...z ul N z~ I. * 4 11 z z 41 ( z a FL - pJ 0 :, w I.. 0 I z. z w \\, Cl) - u zzw JJ 4,..- 4.0 .J.. a A7 0 z I .4-i~ I _ _ __ _ _ C4.. % 0- .1 z IH~ID3M A
1986-12-11
MG/L Chmia Oxyge 00340 ARSENIC 01000 002BORON 0102 Total Ov-gale 00640 BARIUM 131005 01007 BORON. 01020 CARDON as C 0 * Diseelvud 0 1 CADMIUM 01025...Goldenrod) U - Utricularia sp. (Bladderwort) B - Scirpus sp. (Bulrush) h6 - Myriophyllum tenellui (Leafless Mil- H2 - Elodea sp. (Waterweed) foil) n1... Dioxide I - -- -- Arsenic C 10 (10 10 410 ug/L Barium 14200 j( 200 (200 (200 ug/L Cadmium !4 10 ( 10 1 10 4 10 ug/L Chromium ( 50 4 50 4 50 50 ugSL
1985-09-04
health effects was noted in any of the monitor wells. Wells RFW- I , RFW-2A, . and RFW-4, at the Base Landfill, RFW-5 (CFTA) and RFW-10 (PFSA) were...88-D-4006 F/G 24/4 UmEohEEEEEEmiE EEEEEAhEEEEEEEEEEEEEEEEEE EhEEEEmmhmmhhEEE I EEEEEEEEEEEEE 11111 3315 111W12 w ~ ~ ~ ~ d -W w w - v w v w ,!:..4 4...OEHL) Brooks Air Force Ba:;e, Texas 78235-5501• DTIC ECTE October 1935 JUL 0 6 1988 H p.’ DESI CONSULTANTS Approve-. h)r pvhTElMre Volume I - Text " L
1984-09-01
a .4 0) V U) co >- 194 .> ~ Ŕ & .4a 0: -0W 4 Cc %0 4 o 1.C " 0 $ 4 4 0 )ON c400 .,4 W 44 V c W0r c 114-4 CU G% * cW 0 5140 U Go44J 0... 4 .8 45 a co...contamination may be attributable -- to the use of aqueous film forming foam ( AFFF ) in fire training at these areas. AFFF is a fluorocarbon surfactant with a...8217’ >.*.* chemical oxygen demand (COD) of 40,000 mg/l. Data are not ," available on the hazardous or toxic properties of AFFF and its - degradation
1985-07-01
protein, and AFFF (Air Force Firefighting Foam). The frequency of training exercises has varied considerably over the years. During the early 1970’s...Surface ’ Cement/ Bentonite Grout Bentonite Seal Sand Pack 1. Ground Water Elevation r Mamaur July 4.5, 194 * . FIGURE 3-9 WELL CONSTRUCTION SUMMARY, ZONE...e zzzzzzzzz z I z z Z 0 -. N N E-3 3 0 3 3 w 3 w 0 o z ~ zzzzzzzz z z z z E- 0 0 E- 0z zzzzzzzz zz aua E- 0 4 10 zw 3 E- z 0 0 U)z V fC InZ OE- 3
1984-11-01
CONTENTS Section Title Page 4.3 Water Chemistry Conditions 4-10 4.3.1 Groundwater Quality Results 4-10 0 4.4 Water Quality - General 4-11 4.4.1 Water...Quality - General 4-11 4.4.2 Water Quality at LAFB 4-11 4.4.3 Soil Quality - General 4-15 0 4.4.4 Soil Quality at LAFB 4-15 4.4.5 Conclusions 4-16 5...ALTERNATIVE MEASURES 5-1 5.1 General 5-1 0 5.1.1 Base Production Wells 5-2 5.1.2 Current and North Fire Depart- 5-2 ment Training Areas 5.2 Summary 5
1988-06-01
4 1r0 S tI I ;C;C 00000000 88 8888 mH I lu-It u~W I C In 1 0 Al0 * I " 1 a lei 0 !’. *’ 0 t I I UpV N MM w k4Ř I in N inM n in in in in in r4 4...John Forrest Luke AFB Richard Johnson WESTON Greg Hill WESTON Synopsis: The first portion of the meeting was a general discussion of well specifications...ore 1963-1964 Lancaster County General Hospital processing operations, 6 6Research laboratory for analytical Mr. Marks air contaminant testing
Installation Restoration Program Management Plan
1999-03-01
Proving Ground Dugway Proving Ground White Sands Missile Range Yuma Proving Ground Aviation Missile Command Redstone Arsenal Letterkenny Army Depot...approved for Public Release DUC QUALITY INSPECTED 3 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND ...environmental documents. The TIC is located at the USAEC at Aberdeen Proving Ground , MD. If an installation or MACOM/MSC is not aware of
Installation-Restoration Program Preliminary Assessment, Naknek Recreational Camps, Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-04-01
The Hazardous Materials Technical Center (HMTC) was retained in January 1988 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment of Naknek Recreational Camps, Alaska, DoD policy is to identify and fully evaluate suspected problems associated with past hazardous-material disposal sites on DoD facilities, control the migration of hazardous contamination from such facilities, and control hazards to health and welfare that may have resulted from these past operations. Past installation operations involved the use and disposal of materials and wastes that were subsequently categorized as hazardous. The major operations of Naknek Camp I and Camp II did not use or disposemore » of HM/HW; however, these camps were used by the Air Force as dump areas and landfills. Waste oils, fuels, and polychlorinated biphenyls (PCBs) were among the wastes disposed of during these dumping activities. Information obtained through interviews, records, and field observations resulted in the identification of three sites that are potentially contaminated with HM/HW. At each of the identified sites, the potential exists for contamination of surface water, soils, and/or ground water and subsequent contaminant migration.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report presents the results of the Site Investigation (SI) conducted at IRP Sites No. 1, No. 2, and No. 3 at the 106th Civil Engineering Flight (CEF) located at Roslyn Air National Guard Station (ANGS), Roslyn, Long Island, New York. A Preliminary Assessment (PA) (AD-A238 847) of the 106th CEF resulted in the identification of two potentially contaminated waste holding areas and a waste sludge application site. These sites were identified as IRP Site No. 1 (Access Road to Aerospace Ground Equipment `AGE` Shop), IRP Site No. 2 (Old Waste Holding Area No. 1), and IRP Site No. 3more » (Old Waste Holding Area No. 2) and recommended for further investigation under the Installation Restoration Program (IRP).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-11-01
The Hazardous Materials Technical Center (HMTC) was retained in May 1986 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment (PA) - Records Search for the 155th Tactical Reconnaissance Group (TRG), Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska (hereinafter referred to as the Base). The Records Search included: an onsite visit including interviews with 19 Base personnel conducted by HMTC personnel on 21-23 May 1986; the acquisition and analysis of pertinent information and records on hazardous materials use and hazardous-waste generation and disposal at the Base; the acquisition and analysis of available geologic, hydrologic, meteorologic, and environmental data frommore » pertinent Federal, State, and local agencies; and the identification of sites on the Base that may be potentially contaminated with hazardous materials/hazardous wastes (HM/HW).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document, a Record of Decision (ROD), presents the selected remedial action for the AC W Site, Installation Restoration Program (IRP) Site 12, at Mather Air Force Base (AFB), Sacramento County, California. Reports indicate that from 1958 to 1966 waste solvents and transformer oils were disposed in a waste disposal pipe in the AC W area. Investigations conducted as part of the Air Force Installation Restoration Program (IRP) failed to locate the waste disposal pipe but did find trichloroethylene (TCE) contamination in the shallow water bearing zone (SWBZ) in the AC W area. The SWBZ is classified as amore » potential source of drinking water by the State of California, although it is not currently used in the AC W area. The selected remedy will address the potential threat to human health posed by TCE contamination in groundwater (primarily in the SWBZ).« less
Quantification of Uncertainty in the Remedial Investigation/Feasibility Studies Process
1993-09-01
Environmental Restoration Division, HQ Air Combat Command at Langley AFB . Without his support this thesis would not have been possible. Through his...Lester, Restoration Program Manager, Wright-Patterson AFB , stated that the Operable Units (OUs) at Wright- Patterson AFB were regrouped (sites moved...provided detailed information on each installation’s sites and OUs and how they were related. For example, the MAP for Hamilton AFB might describe how
1988-05-26
tD o 11 11 11 -l m N1 -0 e a, 1 0...2E z z z z 2 z z z S SO, EB S IED O-. CDI z C z z z CP TD gD 2 i 2Qaniz z z z sa -@ 2N’. Us(~ -- (XJ 3 gN( C’Ea - 2E S00 0 00 00 00 00 00 00 00 0 a 4...dr.f mm, 10 fd, I---_1_~a -- ______________0 5;’~ SOAP- bAL -ft VU.-a& 44L PUMPING LXVEL 4bd .’ lM" -- ) fI ... ______ @-Ph. " o0 3s....4..0 a ir a.m
1984-06-01
APPENDIX E GLOSSARY OF TERMINOLOGY AND ABBREVIATIONS AF: Air Force. AFESC: Air Force Engineering and Services Center. 3E AFFF : Aqueous Film Forming Foam...34U - 0 ID 0 w M ol fc a, C’ 4) Em)4 Q 4)j 0 0 0 x "a x a. 13 As W a- cu I e W 4)-~ ? 4 -04.4 4.1. jl) in -U)4 0 14)~ ~~ ~~ ~ 0 0 00.4 4 ~ 4 )4 I...8 and 3 a; fC ;arit ,:On or Ccrce E rer ierat or: US.WI~ereral Electric - ’~’Yo lwi Unkrrown :.:e ;aeid by: E.ob Steele, 1,;hn Absalon, Ernie
1986-04-07
Commissary/ FCS Operating Loc L Hq MAC U.S. Customs U.S. Department of Agriculture U.S. Postal Service USAF Trial Judiciary 5th Circuit 17th...extinguish- ing agents used at the site were aqueous film forming foam ( AFFF ), protein foam, and water. The site has no berms or diKes to contain...in ^r^u-i —-••^■■r*M(^*iMr<-* ■•»«M<N»--*’ fc «^’^a • M oo ooo ostfr^o^oo — — or* — — i-*’«’*-«’^r^o — M -N*^ or»^ -iM^0’^w^’-><n^>#^’fN
1986-06-10
82174 m c r- %0~ tn r- cL LC 0 $44 bO CO 4 4- 4 -r- :x:c :41 La COOP w w-. u- r0.0)CO 0)~~~ 0) 0 0 O4- -4Ca co~i CO 0)00 0 >O- .H CO) 0O CO CO 0 o-4 Li...bChromatographs of samples MW 103 and field duplicate QA6b showed a peak matching the re- I tention time of vinyl chloride. The positive identity of...this peak was not confirmed by either second-column gas chromatographic analysis or by mass spectroscopy. Therefore, it cannot be definitely stated
1986-08-09
aquifer analysis, and sampling of ground water monitor wells to determine effectiveness of wastewater treatment process. Ida- Con Corporation...The Pro ect )A Spervisor i dc :7ri J, I, ontrollin hvde co n ... nsr 44 a Fie Ld note books, Iogsheets , be nch sheets, t rac in.r r-l, and report...NON .ocp 4a 0 .0... .. - a o 00--.--- ( N NN N .4N .)mm o m mM 3 2 4.2 3 3 3 3 33 3 3 3 m w r3 GmO 23 U, 3 33 3 2 3 3 3 30O13 CŘ oa nL nV) 0U n ( A 0L
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, C.
This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.« less
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2014 CFR
2014-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2013 CFR
2013-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
32 CFR 202.12 - Administrative support and eligible expenses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... expense of a RAB: (1) RAB establishment. (2) Membership selection. (3) Training if it is: (i) Site... availability of funds, administrative support to RABs may be funded as follows: (1) At active installations... Restoration account for the Formerly Used Defense Sites program. ...
Installation Restoration Program Preliminary Assessment Granite Mountain Radio Relay Station, Alaska
1989-04-01
the mountain. Within the vicinity of Granite Mountain Pluton, these rocks are characteristically hornfelsic and propylitically altered to a hard, pale...uncorrupted; unspoiled. PROPYLITICAL - Pertaining to or resembling propylite , a hydrothermally altered andestic. PYROXENE - A group of dark rock-forming
2006-03-01
2003 Air Emission Inventory, July 2004. o The generators are assumed to be diesel-fired and have a horsepower rating of less than 600 hp. o...In July 2003, the 460th LRS purchased and installed an automated movable storage system for mobility bag storage. This system eliminates wasted aisle...Installation Restoration Program Draft Final Engineering Evaluation/Cost Analysis IRP Site 4. July . • URS Corporation (URS). 2003a. Buckley Air Force
1987-04-01
it.fr CL SAtVOY CLAY ffm «aJlar *# «oo-y* CAttpt moist 1 afto-3o.1 ff <M J AQ21 ÄJJ 100 I 5 Of9 G-ftftVtL occr\\^ sr»J<<J, 5...r<. »* u«</ «<**#**/%* ***>4 ***" I>#K HaWat/e Jcvc-lvp*4<*t ä t/mflcfß»*cit a/*-*p 7 v-y-s *r l-S a 4-1*5 3b-?/-5 ck¥ ClAjf ffm ±il...Rick A. Belan Project Director RAB:sg Attachment H-120 ^«P^—iw^^,«--^-^*wg ATTACHMENT 1 H-121 mTS 6-: 1 I As -oi ^ acca - -03
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kamp, G.; Regan, P.; Ninesteel, R.
1988-01-01
Kelly Air Force Base (AFB), which was founded in 1917, is involved in logistics and maintenance activities supporting the Air Logistics Command. In addition, Kelly AFB hosts over 50 tenant organizations representing the Air Force, Department of Defense, and other government agencies. Over the years waste disposal from this complex was conducted in a manner that led to the identification of over 30 sites to be included in the Installation Restoration Program (IRP) after the Phase 1 investigation. A methodology was needed to prioritize the Remedial Investigations and Feasibility Study (RI/FS) activities for the sites. A Strategy Plan was developedmore » that involved reviewing and interpreting existing data, identifying data voids relative to site specific RI/FS activities, and developing methodology to prioritize activities. Sites were prioritized, and a comprehensive IRP planning document was developed. One data deficiency was revealed -- the lack of understanding of the Basewide hydrogeologic conditions necessary to establish an effective restoration program. A Hydrogeologic Investigation was initiated to provide this data. This data will allow better interpretation of the interaction of the sites, particularly those in close proximity, and improved planning of remediation activities.« less
Preliminary Assessment/Site Investigation: Tooele Army Depot, Utah. Volume 2. South Area
1988-12-29
Program until the period from 17 February to 5 March 1987. 1.3 OVERVIEV OF REPORT The remaining chapters of this report (Volume II) address the following...Engineering, Science, and Technology, Inc. for the purpose of aiding in the implementation of the U.S. Army Installation Restoration Program . The use of...NUMBERS PROGRAM PROJECT ITASK WORK UNIT ELEMENT NO. NO, NO. ACCESSION NO. __ __ __ __ __ __ _ _ __ __ __I___1___1_ 003 11 TITLE (Include Security
Letter from EPA's Assistant Administrator for Enforcement and Compliance Assurance expresses concern over Tyndall Air Force Base's August 19, 2010, Memorandum on Environmental Restoration Program Progress at Tyndall AFB, FL.
1984-01-01
from the north, thereby occasionally encouraging unseasonably warm temperatures. Unseasonably cold temperatures most often occur when the Bermuda...marl. Hawthorn 160 - Sandy phophatic marl and soft limestone with interbedded brittle -shale. 25 OLIGOCENE (Ta) Flint River 50 - Reddish-yellow sand
Installation Restoration Program Records Search for Alaska DEW Line Stations
1982-06-01
Chlorinate hydrocarbons Radar components Calgon corrosion inhibitor 55 gallon drums (empty) Lye Lime Corrosives Antifreeze Paper Wood Plastics AVGAS...Factor Subsoare A I Persistence Vcor * Subaccro a C. Appl~y "yicaJ. state =iLtipiisr Sub•coce 3 X Physical State Mltipler - Waste Caracteristics
1982-04-01
number) This report presents a review and evaluation of the available information on the use of physical and hydrological barriers for containment or...UNCLASSIFIED 1 $SCCuRITY CLASSIFICATION OF T.qiS *&GE When Daa Entered SUMMARY The available literature on methods for containment or diversion of ground...II. Preliminary Considerations for Installation of a Ground Water Containment or Diversion Barrier .. ... ....... ...... 13 III. Slurry-Trench Cutoff
Installation of Existing Lift Systems for the Handicapped on Light Rail Vehicles
DOT National Transportation Integrated Search
1985-05-01
This report documents the results of a three-phase program to install an existing transit bus wheelchair lift system on a Boeing Light Rail Vehicle (LRV). Program activities included a review of lift requirements, evaluation of existing lift systems,...
The Installation Restoration Program Toxicology Guide. Volume 5
1990-11-01
biological systems may not differentiate metals on a basis other than oxidation state. In essence , this results in a specific function (e.g. intracellular...biological exposure Indices. 5th ed. Cincinnati, Ohio, pp. 422-426 (as cited in 6206). 6368. Jasmin , G. 1973. Experimental production of polycythcmia in
This document reports on the results of bench-scale tests of treatment technologies for explosive-containing sediment located in lagoons at Army ammunition plants. A companion literature search identified the appropriate explosives remediation technologies to be evaluated. ...
Installation Restoration Program Records Search for Dobbins Air Force Base, Georgia
1982-04-01
migation Death to irond water ____________ lift ogaeiitation 1 . Subsurface flow_____I a _____________ Direct aess W 4round water______ j Submrs(10 x actr...potential pathways, surface water migation , flooding, and ground-water * migration. Select the highest rating, and proceed to C. f 1. Surface water migration
1988-12-01
and do not refer to monitoring zones at McClellSn AFB. b Priority poLutant metals analyses also included U.S. EPA Methods 206.2, 245.1 and 270.2. EW a...sampling protocol, and the laboratory is audited routinely. Therefore, no corrective action other than good training and supervision is necessary. The same
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1988
1989-03-01
63 6 1 17 36 IOWA 3 49 49 0 3 7 0 0 1 5 IDAHO 15 34 34 0 2 10 0 0 1 5 ILLINOIS 14 140 131 6 12 34 1 1 10 15 INDIANA 12 122 119 0 4 39 3 0 3 7 KANSAS 8...4 4 IOWA TOTALS 49 0 3 7 0 0 1 5 IDAHO ARMY ARCO AEC SITE 1 BONNEVILLE 1 BROKEN KETTLE TRAINING AREA 1 BUHL 1 GOODING I GOWEN FIELD 1 HALLEY 1 IDAHO ... IDAHO TOTALS 34 0 2 10 0 0 1 5 B- 13 Table B-2 DEPARTMENT OF DEFENSE ENVIRONMENTAL RESTORATION PROGRAM State by State Installation Status Listing (As
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
Environmental Assessment for Renovation and Small Addition for AGE Facility MacDill AFB, Florida
2005-05-01
one lift station, all of the sanitary sewer lines have, in essence , at least one check valve to stop the inflow of floodwater to the WWTP. The...Force Base Installation Restoration Program 7621 Hillsborough Loop Dr. MacDill AFB, FL 33621-5207 Jasmine Raffington FL Coastal Management
Installation Restoration Program Records Search for Moody Air Force Base, Georgia.
1983-02-01
Mocap, and Chlordane ( termite control only). Ochemcomp and anticoagulants are commonly used for rodent control. The major herbicides currently used are...buried in 10 55-gallon drums in 1971. A single pit was excavated about 6 to 8 feet deep, and the filled hole was capped with a clayey-sand mound to
1989-11-01
and/or spill sites on Department of Defense (DoD) installations, and " Control hazards to human health, welfare, and the environment that may have...Investigations do not indicate harmful levels of contamination and do not pose a significant threat to human health or the environment. The site does not warrant...Feasibility Study - Investigation confirms the presence of contamination that may pose a threat to human health and/or the environment, and some sort of
Method for in-situ restoration of plantinum resistance thermometer calibration
Carroll, Radford M.
1989-01-01
A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or strain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's.
Method for in-situ restoration of platinum resistance thermometer calibration
Carroll, R.M.
1987-10-23
A method is provided for in-situ restoration of platinum resistance thermometers (PRT's) that have undergone surface oxide contamination and/or stain-related damage causing decalibration. The method, which may be automated using a programmed computer control arrangement, consists of applying a dc heating current to the resistive sensing element of the PRT of sufficient magnitude to heat the element to an annealing temperature and maintaining the temperature for a specified period to restore the element to a stress-free calibration condition. The process anneals the sensing element of the PRT without subjecting the entire PRT assembly to the annealing temperature and may be used in the periodic maintenance of installed PRT's. 1 fig.
Walla Walla River Basin Fish Habitat Enhancement Project, 2002-2003 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volkman, Jed
2005-12-01
In 2002 and 2003, the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Fisheries Habitat Program implemented stream habitat restoration and protection efforts on private properties in the Walla Walla River Basin with funding from Bonneville Power Administration (BPA). The objective of this effort is to protect and restore habitat critical to the recovery of weak or reintroduced populations of salmonid fish. The CTUIR has currently enrolled nine properties into this program: two on Couse Creek, two adjacent properties on Blue Creek, one on Patit Creek, and four properties on the mainstem Walla Walla River. Major accomplishments during the reportingmore » period include the following: (1) Secured approximately $229,000 in project cost share; (2) Purchase of 46 acres on the mainstem Walla Walla River to be protected perpetually for native fish and wildlife; (3) Developed three new 15 year conservation easements with private landowners; (4) Installed 3000 feet of weed barrier tarp with new plantings within project area on the mainstem Walla Walla River; (5) Expanded easement area on Couse Creek to include an additional 0.5 miles of stream corridor and 32 acres of upland habitat; (6) Restored 12 acres on the mainstem Walla Walla River and 32 acres on Couse Creek to native perennial grasses; and (7) Installed 50,000+ new native plants/cuttings within project areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kraybill, R.L.; Smart, G.R.; Bopp, F.
1985-09-04
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less
1988-06-01
Mencer Mitzi S. Miller Dist J. W. Zolyniak Prepared by the Oak Ridge Gaseous Diffusion Plant Oak Ridge, Tennessee 37831 operated by MARTIN MARIETTA...Drop A20 S Oak Ridge, TN 37830 * Mailing Address for Regular Mail: Martin Marietta Energy Systems, Inc. P.O. Box 2003 Oak Ridge, TN 37831-7440 Mitzi
1988-03-01
Cheyenne area is characterized by semi-arid conditions and large diurnal and annual temperature changes. The summers are generally warm with humidity...contaminants through pathways (groundwater, surface water, soil, and air). MIOCENE - An epoch of the upper Tertiary period, after the Oligocene and before the
1991-02-01
Department of Agriculture (USDA): Soil Conservation Service, February 1968). Houston County is characterized by a warm and humid climate that borders...Figur I..,1 PhUTogrpER Map. of theAre 111-2 3. EXPLANATION - Residuum -~ l Citronelle Formation Catahouia Sandstone Paynes Hammock 0 Oligocene
1993-09-01
Surface Area Contacted Per Event SB soil boring Sb Antimony SD sediment sample SDG Sample Delivery Group SDWA Safe Drinking Water Act Se Selenium sec second...and were laid out using a Brunton compass and measuring tape. The station locations were gridded at intervals of 25 feet. Measurements indicating the
1988-10-01
previous directives and meoranda. Although the DOD IRP and the USEPA Superfund pr"gr ware essentially the sase, differences in the definition of progr...Midway and Wilcox inJ Mississimp, Bulletin 102, Mississippi Geologic Research Papers, Mississippi Geological, Ecnomic and Toporapic Survey, 1964. 16
Environmental Quality Technology Demonstration, Evaluation and Transfer Activities
1996-12-02
and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft
2007-06-01
forests , and the water filtration function performed by these ecosystems may be at risk . Maloney, K. O. and J. W. Feminella. 2006. Evaluation of...additions to perennial streams. Phase 1 – Effects of Disturbance In our studies of sedimentation effects on riparian forests , vegetation...riparian forests associated with ephemeral streams. We determined thresholds beyond which both long-term and current rates of sedimentation
Installation Restoration Program Stage 3. McClellan Air Force Base Quality Assurance Project Plan
1989-08-30
QUALITY ASSURANCE PROJECT PLAN TDTM FINAL ELECTE C\\ JAUG 3 119891 .. .. . .. 0.. ... PREPARD.FOR HEDURTR FL/E WRGTPATRO .. F... OHI.443 ........ 1N...P.E. Contract Program Manager \\ 0 RADMAN 0 TABLE OF CONTENTS Section Page 1.0 INTRODUCTION ................................................... 1 of 6...Section: 1.0 RADM Revision: 1 CO PO AIO NDate: 04/12/89 O Page 1 of 6 1.0 INTRODUCTION The Quality Assurance Project Plan (QAPP) presents in specific
1988-11-01
Forming Foam ( AFFF ), Halon 1211, and dry chemicals were utilized as extinguishing agents from 1956 to the present. Residual 3fuels were burned prior to...0O, 0 0 & CW MW Z -. 0.. ... 0U % 0 in VI 4- 183 I C4 cLa0- Inm0 Ia In to in 00 0 000a00b 0 0 0 0 0a00000 o co I a I- o cm I-t to I U- NI 4 I- ~ I-L...0 c -C S-1 -) 0 0 c*Ac- m).> ---OC r -1 e 3 w to- 0.C C. %- 0o C.-’ S004(1-0 0 <A LA. GE > t 6C0U>n4- (DC) 1-) fc >-.- O -) 60 0. .1 toC (U eV 4
1987-12-01
GAO 0 2L -4e- - Lq*Lio rol -4 1 IOU CI S W a G-v a. IV0 0 J= C. Ic LG 4sa C...8217 ’ ~ -i CIj -43j ~LU . l co r I_- z3 335 0- C= cu w- CDP aIC. *I lr_ - CkIJ LA-. n= C G C=> gao ’ GeL) =31 CAEl = C- C-10. LLaJ 1= w CL -* I t CI or SLLJ...6- Z u - a a qcrLLJ < nC Liu~ LI i LL.J CL. w <r LL <r 03 440 -x C= cn z4 -. - XM Z~ A ~ ’’ ~ "~’ , 4 *.\\~.S~4’N’~~’ - Iz JINI 1 *~ I- LLW W, a,
ERIC Educational Resources Information Center
Cheng, Kai-Wen
2013-01-01
Although earlier concentration has addressed the use of corporate e-learning programs (CELP), the dissimilitude between pre and post installation reaction to CELP is less explored. This study adopted a two-phase investigation to survey learner intention to use CELP and actual behavior within an international accounting firm. In the…
Installation of C-6533(XE-2)/ARC ICS in UH-1H helicopter
NASA Astrophysics Data System (ADS)
Hnat, J. A.
1980-07-01
This report documents the results of the installation of the C-6533(XE-2)/ARC ICS in UH-1H helicopter. Installation was performed at the AEL, Inc., Monmouth County Airport facility. Design of each installation was coordinated and approved by the Government. The mechanical and electrical installation drawings for the helicopter are attached as Appendix A of this report. The new ICS system consisted of new cabling, new intercoms and helmets rewired with new microphones. All four crew stations of the helicopter were reconfigured with the new system. Existing cabling for the standard ICS system remained in the aircraft but was securely stowed for later restoration of the aircraft. The helmets (4) were rewired using separate jacks for headphones and microphone lines. Transmit and receive cables were installed in the aircraft with a minimum separation of one inch between cables. A junction box was fabricated and installed on the aft end of the console to house the fan-out terminal strips. Transmit and receive lines' separation was maintained in the junction box. During the test phase the onboard radios were used with the new ICS system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzey, B. R.; Davis, R. G.
2014-09-30
On the I-35W Bridge in Minneapolis, Minnesota, the GATEWAY program conducted a two-phase demonstration of LED roadway lighting on the main span, which is one of the country's oldest continuously operated exterior LED lighting installations. The Phase II report documents longer-term performance of the LED lighting system that was installed in 2008, and is the first report on the longer-term performance of LED lighting in the field.
Malmstrom, Hans; Xiao, Jin; Romanos, Georgios E; Ren, Yan-Fang
2015-01-01
Implant therapy is rapidly becoming a standard of care for replacing missing dentition. Predoctoral dental curricula include some training in the implant restorative phase but offer limited exposure to the surgical phase, so it is important for postdoctoral general dentistry residency programs to provide competency training in all phases of implant therapy. The aim of this study was to determine the training needed for general dentistry residents to achieve competence in this area, specifically by defining the number of clinical experiences necessary in both the surgical and prosthetic phases of implant-retained mandibular overdenture construction (IRMOD). Fifteen Advanced Education in General Dentistry (AEGD) residents at one academic dental institution placed two implants in a total of 50 patients with edentulous mandibles and subsequently restored them with IRMOD. The supervising faculty member and the residents evaluated the competency level on a five-point scale after each implant placement and prosthetic case completion. According to the faculty evaluations, the residents achieved surgical competence after placing two implants in four to six cases and prosthetic management competence after restoring two to four cases of IRMOD. All 50 patients were satisfied with the treatment outcomes of IRMOD. This study concluded that general dentistry residents could potentially achieve competence in both the surgical and prosthetic phases of implant therapy while enrolled in an AEGD program.
Installation Restoration Program Records Search for McClellan Air Force Base, California.
1981-07-01
waterweed (Elodea spp.), button snakeroot (Eryngium aristulatum), quillwort (Isoetes howellii), water purslane (Ludwigia palustris), pillwort...persicaria Curly dock Rumex crispus Portulacaceae Purslane family Red maids Calandrinia ciliata Miner’s lettuce Montia perfoliata Common purslane Portulaca...marine and continental sedimentary rock which contains saline or brackish water. These rocks are impermeable and form the bottom of the basin, with
1983-09-01
underlain by soils of the Gravity series and " of the Wabash -Gravity-Nodaway complex. These soils, primarily silty clay loams, are formed in fine...Electric Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- S cadmium batteries (24/year) and sulfuric
1990-07-01
Nitroaniline 4-Nitroaniline N-Nitroso-di-n-butylamine N-Nitrosopiperidine Pentachlorobenzene Pentachloronitrobenzene Phenacetin 2- Picoline Pronarnide 1,2,4,5... chromium . Cu: Chemical symbol for copper. 3 DARCY’S LAW: An equation describing the flow of fluids in porous media based on the assumption that the flow
1988-12-01
disseminated silt and shale partings. The unit is medium-bedded and is characterized by numerous fossils of the brachiopod Resseralla fertilis . The... runoff from the Base is collected by the storm sewer system and discharged to McCrory Creek (Figure 6). The confluence of McCrory Creek and the Stone
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
Ecological risk assessment for Mather Air Force Base, California: Phase 1, screening assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyers-Schoene, L.; Fischer, N.T.; Rabe, J.J.
Mather Air Force Base (AFB) is among the numerous facilities scheduled for closure under the US Air Force (USAF) Installation Restoration Program (IRP). A component of the Mather AFB IRP is to prepare risk assessments for each of the chemically contaminated sites. Because no previous ecological risk related studies have been conducted on Mather AFB, the authors proposed a phased approach to assessing ecological risks at the base. Phase 1 consisted of baseline ecological surveys that collected data over a 12-month period. In addition, benchmark screening criteria were used in conjunction with modeling results that utilized measured concentrations of chemicalmore » analytes in abiotic samples. Phase 2 may consist of the collection of more site-specific data and toxicity testing, if warranted by the Phase 1 screening analysis. This approach was in agreement with the USAF`s ecological risk assessment guidance and met the approval of the Air Force and USEPA Region 9. The authors found the use of established and derived screening values to effectively aid in the focusing of the ecological risk assessment on those chemicals most likely to be hazardous to ecological receptors at the base. Disadvantages in the use of screening values include the uncertainties associated with the conservative assumptions inherent in the derivation of benchmark values and the difficulty in extrapolating from laboratory determined benchmark values to impacts in the field.« less
2007-12-06
established action levels characterized pursuant to the Environmental Restoration Program (ERP) that is managed by the Restoration Program Manager (RPM) of...interviews are presented in Appendix E. Mr. D.J. Haarklau, 99 CES/CEVC, Environmental POLs Program Manager Mr. Haarklau provided GSRC with...Program Manager for 10 years, and according to a records search, no reportable spills have occurred within or in the vicinity of the subject property. He
Chang, D P
1998-01-01
Outreach, training, technology transfer, and research are often treated as programmatically distinct activities. The interdisciplinary and applied aspects of the Superfund Basic Research Program offer an opportunity to explore different models. A case study is presented that describes a collaborative outreach effort that combines all of the above. It involves the University of California's Davis and Berkeley program projects, the University of California Systemwide Toxic Substances Research and Teaching Program, the U.S. Navy's civilian workforce at the former Mare Island Naval Shipyard, Vallejo, California (MINSY), a Department of Defense (DoD) Environmental Education Demonstration Grant program, and the Private Industry Council of Napa and Sonoma counties in California. The effort applied a Superfund-developed technology to a combined waste, radium and polychlorinated biphenyl contamination, stemming from a problematic removal action at an installation/restoration site at MINSY. The effort demonstrates that opportunities for similar collaborations are possible at DoD installations. PMID:9703494
The Installation Restoration Program Toxicology Guide. Volume 1
1989-07-01
affinity for adipose tissue , which is more prevalent in women and would result in less unchanged chloroform and more carbon dioxide exhaled. This...magnesium, potassium, sodium, tin, zinc , and their alloys. ADI Acceptable daily intake ADL Arthur D. Little, Inc. Adenocarcinoma A malignant tumor...originating in glandular or ductal epithelium. Adenoma A benign growth of glandular tissue . ae Acid equivalent Aerosol A suspension or dispersion of small
Installation Restoration Program Records Search for Luke Air Force Base, Arizona.
1982-06-01
These soils were formed in recent alluvium derived from a wide mixture of rock type, including andesite, basalt , schist, rhyolite, and granite-gneiss...were originally derived from granite, granite- gneiss, schist, andesite, basalt , and limestone. Permeability is moderate (same as Gilman series...alluvium is the crystalline rock, granite, granite-gneiss, anyolite, schist, andesite, basalt , and limestone, which eroded from the mountains, and were
Installation Restoration Program Records Search for Davis-Monthan Air Force Base, Arizona.
1982-08-01
inspection labs, and corrosion -2- control shops. These industrial operations generate varying quantities of waste oils , fuels , *solvents, and cleaners. The...standard procedures for the disposition of the majority of the waste oils , fuels , solvents, and cleaners has been (1) fire department training...and corrosion control shops. These industrial operations generate varying quantities of waste oils , fuels , solvents, and cleaners. The total quantity
Identification of Critical Biological Parameters Affecting Gastrointestinal Absorption
1990-01-01
invention that may in any way be related thereto. Please do not request copies of this report from the Harry G. Armstrong Aerospace Medical Research...BALLINGER, Lt Col, USAF, BSC Chief, Toxic Hazards Division Harry G. Armstrong Aerospace Medical Research Laboratory UNCLASSIFIED SECURITY CLASSIFICATION OF...involved in a very large task of hazard management through its Installation Restoration Program. The pioneering efforts of the Armstrong Aerospace
The Installation Restoration Program Toxicology Guide. Volume 2
1989-07-01
producing substance. Carcinoma A malignant epithelial tumor. CAS REG NO Numeric designation assigned by the A.~’erican Chemical Socecty’s Chemica ...violent, exothermic, and capable of causing violent rupture of sealed containers. ABBREVIATIONS AB-I1 Polymerization A chemica reaction, usually carried...a deleterious effect on the taste and/or odor of human food derred from aquatic environments cannot be discharged into inland surface waters
The Installation Restoration Program Toxicology Guide. Volume 4
1989-07-01
64.15 64-5 JP-4 Fuel-Water Partition Coefficients (K,) for Selected Hydrocarbons .......................... 64-20 04-6 Acute Toxicity of Components of JP...65.11 65-3 Equilibrium Partitioning of Select Gasoline Hydrocarbons in Model Environments ............... 65-14 65-4 Acute Toxicity of Components o...66-27 66-5 Acute Toxicity of Components of Fuel Oils ............ 66-37 67-1 Composition Dat,- for Stoddard Solvent
Operable Unit B1 Interim Record of Decision. Installation Restoration Program (IRP)
1993-07-28
Geology ..................................... I-1 2.0 SITE HISTORY AND ENFORCEMENT ACTIVITIES ........... 11-5 2.1 Background on Contamination Problems at...McClellan AFB OU BI . 11-5 2.2 Previous Studies ................................ 11-5 2.3 Regulatory and Enforcement History .................... 11-7...1-4 2-1 History of OU BI ...................................... 11-6 4-1 Cross-Section A-A’ of OU B.I
1994-04-01
measure RRI - Rapid Response Initiative RT - retention time s - seconds SDG - sample delivery group I SI - site investigation SMCLS - secondary maximum...tape and a compass and each grid node was marked with a wooden stake or fluorescent orange paint. At least one point on the grid was surveyed so the
Installation Restoration Program Preliminary Assessment, Big Mountain Radio Relay Station, Alaska
1989-04-01
DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design, project management and implementation of various...management functions, as well as direct involvement in project marketing, corporate computer and CAD operations, and company R&D efforts. 5 DETOX , Inc...interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as sale and management of several substantial and
Installation Restoration Program Preliminary Assessment Naknek Recreational Camps, Alaska
1989-04-01
training, as well as other environmental matters. DETOX , Inc. (1986): Manager, Technical Services Responsible for the overall development, design...operations, and company R&D efforts. 3 DETOX . Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United States, responsibilities...resulted in establishing a widespread customer interest base for the groundwater treatment equipment and technical services offered by DETOX , as well as
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rinehart, Ben N.
1994-08-01
A report is presented on the final phase of an energy research program conducted by the U.S. Department of Energy (DOE) involving two geothermal well sites in the State of Louisiana--the Gladys McCall site and the Willis Hulin site. The research program was intended to improve geothermal technology and to determine the efficacy of producing electricity commercially from geopressured resource sites. The final phase of the program consisted of plug and abandonment (P&A) of the wells and restoration of the well sites. Restoration involved (a) initial soil and water sampling and analysis; (b) removal and disposal of well pads, concrete,more » utility poles, and trash; (c) plugging of monitor and freshwater wells; and (d) site leveling and general cleanup. Restoration of the McCall site required removal of naturally occurring radioactive material (NORM), which was costly and time-consuming. Exhibits are included that provide copies of work permits and authorizations, P&A reports, and cost and salvage reports. Site locations, grid maps, and photographs are provided.« less
Solar demonstration project in a fast-food restaurant
NASA Astrophysics Data System (ADS)
McClenahan, D.
1980-11-01
The results of a two-phase program in which the first phase included the successful use of heat reclamation equipment and energy conservation techniques at a typical fast-food restaurant are described. The project's second phase involved the engineering, designing, installation and interfacing of a solar collector system at the facility. The report will help to serve as a guide for other restaurants around the state, and possibly the nation, which wish to install energy saving systems, or adopt energy-saving techniques, geared to their special needs and equipment.
Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds
Information about the SFBWQP Estuary 2100 Project, Phase 2: Building Partnerships for Resilient Watersheds, part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquat
1989-01-30
D-007 & Hazardous Materials Agency 1 CETHA-TE Task No. 11 . ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS ATTN: CETHA-TE-D...PROGRAM IPROJECT TASK IWORK UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include SecurityClassification...Peter J. Marks 3a. TYPE OF REPORT 13b. TIME COVERED T14. DATE OF REPORT (Year, Month, Day) 115. PAGE COUNT Final FROM 1 /87 TO_1/89 11989 January 3 6
DOT National Transportation Integrated Search
1995-01-01
This report describes a study of shoulder harness installation and use rates in general aviation aircraft. Observations were made at six geographically separate areas to determine estimates of current installation and use rates. An expert panel was e...
A Save-Energy, Save-Money Program That Pays Off
ERIC Educational Resources Information Center
Embersits, John F.
1976-01-01
Suggested guidelines for energy saving on campus include a 3-phase plan: (1) Quick Fix--effective management of what you already have; (2) Refitting--modification of existing systems and installation of simple controls; (3) Systems Convert--installation of computerized controls, waste-heat recovery, solid-waste recovery utilization and other…
2011-01-01
is managed by the Restoration Program Manager (RPM) of the 99 CES/CEVR. Category 4 – Remedial action required and taken. Property where...Restoration Program Manager Mr. Waldo Pulido was contacted at his office, and he stated that he was not aware of any hazardous materials storage or...Site LF-01 and Site ST-27. Mr. Henry Rodriguez, 99 CES/CEANQ, Toxics Program Manager Mr. Henry Rodriguez was contacted at his office in 2009 as
Installation Restoration Program Records Search for Bergstrom Air Force Base, Texas.
1983-07-01
August 1981. "Pilot Plant Study of Copper , Zinc, and Trivalent Chromium Removal by Adsorbing Colloid Foam Flotation ." M.S. Thesis, Vanderbilt...graduate school and one of his activities included researching the removal of heavy metals, including copper , zinc and trivalent chromium, using a large...scale adsorbing colloid foam flotation pilot plant. Professional Registration Engineer-In-Training, Florida % -7. GREGORY T. MCINTYRE Membership in
No Further Remedial Action Planned Decision Document for Site 3.
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery
1996-04-01
This study is to screen and evaluate remediation alternatives for IRP sites at Alpena CR TC, Alpena , MI. The purpose of this FS is to develop, screen... Alpena CRTC. The first step in the PS process is to identify the RAOs and general response actions (GRAs). RAOs consist of medium-specific or site
1995-06-01
Remedial Investigation Report of Sites l-9 at Alpens CRTC Alpena Ml. Volume II Sections 4-6. A remedial investigation was performed on 9 sites at the... Alpena CRTC to determine the extent of contamination at the sites. The sites involved ill this investigation include: Site 1 POL Storage Area; Site 2
1996-05-01
This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Site 2-Pesticide Pit Burial Area was investigated under the Installation Restoration Program. A removal action was conducted in 1988, when pesticide containers and contaminated soil were excavated from the pit. The pit covered an area of approximately 1000 square feet and was approximately 12 feet deep. The report recommends no further action based on study results.
Installation Restoration Program Preliminary Assessment Kalakaket Creek Radio Relay Station, Alaska
1989-04-01
area (Cass, 1959). According to the U.S. Soil Conservation Service, the soils in the general vicinity of Kalakaket Creek are of the Pergelic ...Cryumbrepts-Histic Pergelic Cryaquepts, very gravelly, hilly to steep association. The association is found in glacially carved mountain valleys, moraine foot...two other components. Of the principal components, Pergelic Cryumbrepts, very gravelly, hilly to steep, accounts for 45 percent. These are well drained
1989-03-21
Seattle.Washington 98108 (206)767-5060 Chemistr . Microbklog. and Technical Services 1. TO: Science Applications International Corporation LABORATORY I.D...Certificate 940 South HarneySt.. Seattle.Washington 98108 (206)767-5060 ) Chemistr . Micrcbiob .and Technical Services TO: Science Applications...HarnreySt Seattle.Washington 98108 (206)767-5060 Chemistr " Microbiocoy and Technical Services SAIC LABORATORY NO. 3894 APPENDIX A Method Blank
1990-02-01
PRESENT C,(8;2) 131o sia &1 OTE MUNICIPAL WATER b9PLY WELLS: ON-BASE CW CITY OSARMENTO AREAS NW NORTHRIDGE WATEtj DISTRICT RW RIO LINDA AW ARCADE WATER...1ASE PRODUCTION WELL ACTIVE BAS PRODUCTION WELL ., CITY WELL T #f CALTRANS WELL . EXTRACTION WELL 0 500 1000 N : SCALL IN FEET If-3. 82
Installation Restoration Program (IRP). Operable Unit B1 Remedial Investigation/Feasibility Study
1993-07-01
Alternative Evaluation Criteria ......................... 8-2 8-2 Remedial Alternative Evaluation Criteria Rating System ................ 8-3 8-3...ies, various technologies and process options relative numerical rating system was developed were identified and screened on the basis of (see Table 8-2...extensive paving and PCBs were found (north/central ditch). This storm drainage system , and because of the ditch was paved with asphalt in 1981; before
1988-11-01
poorly sorted, not I E compacted, very plastic . Contains siliceous N diatoms and spores. Organic content high (17.2 T percent of sample lost during...physical character of a rock (e.g., particle size, color, mineral content, primary strutures, thickness, weathering caracteristics , and other physical
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bujewski, G.E.; Johnson, R.L.
1996-04-01
Adaptive sampling programs provide real opportunities to save considerable time and money when characterizing hazardous waste sites. This Strategic Environmental Research and Development Program (SERDP) project demonstrated two decision-support technologies, SitePlanner{trademark} and Plume{trademark}, that can facilitate the design and deployment of an adaptive sampling program. A demonstration took place at Joliet Army Ammunition Plant (JAAP), and was unique in that it was tightly coupled with ongoing Army characterization work at the facility, with close scrutiny by both state and federal regulators. The demonstration was conducted in partnership with the Army Environmental Center`s (AEC) Installation Restoration Program and AEC`s Technology Developmentmore » Program. AEC supported researchers from Tufts University who demonstrated innovative field analytical techniques for the analysis of TNT and DNT. SitePlanner{trademark} is an object-oriented database specifically designed for site characterization that provides an effective way to compile, integrate, manage and display site characterization data as it is being generated. Plume{trademark} uses a combination of Bayesian analysis and geostatistics to provide technical staff with the ability to quantitatively merge soft and hard information for an estimate of the extent of contamination. Plume{trademark} provides an estimate of contamination extent, measures the uncertainty associated with the estimate, determines the value of additional sampling, and locates additional samples so that their value is maximized.« less
Advanced Camera for Surveys Instrument Handbook for Cycle 25 v. 16.0
NASA Astrophysics Data System (ADS)
Avila, R. J.
2017-01-01
The Advanced Camera for Surveys (ACS), a third-generation instrument, was installed in the Hubble Space Telescope during Servicing Mission 3B, on March 7, 2002. Its primary purpose was to increase HST imaging discovery efficiency by about a factor of 10, with a combination of detector area and quantum efficiency that surpasses previous instruments. ACS has three independent cameras that have provided wide-field, high resolution, and ultraviolet imaging capabilities respectively, using a broad assortment of filters designed to address a large range of scientific goals. In addition, coronagraphic, polarimetric, and grism capabilities have made the ACS a versatile and powerful instrument. The ACS Instrument Handbook, which is maintained by the ACS Team at STScI, descr ibes the instrument properties, performance, operations, and calibration. It is the basic technical reference manual for the instrument, and should be used with other documents (listed in Table 1.1) for writing Phase I proposals, detailed Phase II programs, and for data analysis. (See Figure 1.1). In May 2009, Servicing Mission 4 (SM4) successfully restored the ACS Wide Field Camera (WFC) to regular service after its failure in January 2007. Unfortunately, the ACS High Resolution Camera (HRC) was not restored to operation during SM4, so it cannot be proposed for new observations. Nevertheless, this handbook retains description of the HRC to support analysis of archived observations. The ACS Solar Blind Channel (SBC) was unaffected by the January 2007 failure of WFC and HRC. The SBC has remained in steady operation, and was not serviced during SM4. It remains available for new observations.
Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate
Information about the SFBWQP Estuary 2100 Project, Phase 1: Resilient Watersheds for a Changing Climate , part of an EPA competitive grant program to improve SF Bay water quality focused on restoring impaired waters and enhancing aquatic resources.
Hanford Waste End Effector Phase I Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berglin, Eric J.; Hatchell, Brian K.; Mount, Jason C.
This test plan describes the Phase 1 testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions’ Cold Test Facility (CTF) using a Pacific Northwest National Laboratory (PNNL)-designed testing setup. This effort fulfills the informational needs for initial assessment of the HWEE to support Hanford single-shell tank A-105 retrieval. This task will install the HWEE on a PNNL-designed robotic gantry system at CTF, install and calibrate instrumentation to measure reaction forces and process parameters, prepare and characterize simulant materials, and implement the test program. The tests will involve retrieval of water, sludge, and hardpan simulantsmore » to determine pumping rate, dilution factors, and screen fouling rate.« less
1990-05-01
ELME’IDORF AFB, AK UNITED STATES AIR FORCE OCCUPATIONAL & ENVIRONMENTAL HEALTH LABORATORY (AFSC) ilb(. IiCAL Sr.(VICES DIVISION (AFOEHLi £3) I BROOKS AIR...UNITED STATES AIR FORCE OCCUPATIONAL AND ENVIRONMENTAL HEALTH LABORATORY (AFSC) TECHNICAL SERVICES DIVISION (AFOEHL/TS) BROOKS AIR FORCE BASE, TEXAS...the following criteria: technical feasibility, institutional requirements, environmental impacts, public health impacts, and cost. This Alternative
The Installation Restoration Program Toxicology Guide. Volume 3
1987-06-01
organ because of injury or disease. log Kow Log of the octanol-water partition coefficient. Lower The lowest concentration of the material in air which...involved in clotting. SGOT Serum glutamic oxalacetic transaminase, an enzyme released into the serum as the result of tissue injury , especially injury ...to the heart and/or liver. SGPT Serum glutamic pyruvic transaminase, an enzyme % released into the serum as a result of tissue injury , 1: especially
1983-06-01
8217rAPTYT 24. PAý’XI?!C ( ALTF??iATIVFS (CASJF TWC- RA Ar ’FP!NATTV\\F COPTACTI’G METHOD 1 Chpmrical Feciiiction Linu ~i/Tacgnon 2 (-,a m ra Trra.Ii a...Clifford Randall, and Paul King (1974), "Biological Treatability of Trinitrotoluene Manufacturing Wastewater," Journal of the Water Pollution Control
1991-02-01
Pliocene I Neogene 5 Miocene o 0 24 Oligocene Paleogene Eocene 58 6 Paleocene 5I56 Cretaceous u 144- 0 Jurassic 0N 208- Z TriassicI 245- (L Permian 286...and its unnamed tributary I are classified as warm water fisheries. G. Groundwater Use of Uppermost Aquifer. I Site Nos. 1-3, Factor Rating 2. The
Installation Restoration Program Preliminary Assessment Gold King Creek Radio Relay Station, Alaska
1989-04-01
to steep Pergelic Cryaquipts- Pergelic 3 Cryochrepts association. The Pergelic Cryaquepts make up 40 percent of the association. These soils are poorly...occurs at shallow depths. 1 Pergelic Cryochrepts make up 35 percent of this association. These soils are well drained and occur on high ridges and...is at a depth of 20 to 40 inches. The remaining soils within this association include Pergelic Cryorthents (15 percent), Pergelic Cryorthods (5 percent
Installation Restoration Program Preliminary Assessment Bear Creek Radio Relay Station, Alaska
1989-04-01
Cryachrepts, very gravelly, hilly to steep - Histic Pergelic Cryaquepts, loamy, nearly to rolling association. This association is extensive on hilly...loam. On steep slopes, these soils are only 20 to 40 inches deep over bedrock. 3 Histic Pergelic Cryaquepts, loamy, nearly level to rolling, make up 25...usually 10 to 20 inches below the peaty surface. 3 Histic Pergelic Cryaquepts, very gravelly, hilly to steep, compose 10 percent of this association. These
1993-11-01
GUARD BASE BATTLE CREEK, MICHIGANI REGIONAL LOCATION MAP ýIG A NI -1 10t TAI MICHIAN I i~amoNL GUAR 1- 94Frie Lake ma 61 , 1cI Lose onI diI 0I...textile fabrics. Xylenes are also used in the manufacture of quartz crystal oscillators, hydrogen peroxide, perfumes , insect repellants, epoxy resins
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
Decision Document for IRP Site No. 3 - Storage Area at the USMC Sublease Area, California Air National Guard, 144th Fighter Wing, Fresno Air Terminal, Fresno, California. This report documents the data, conclusion, and recommendation to support a No Further Remedial Action Planned decision at Site 3 under the IRP.
Installation Restoration Program Records Search for Cannon Air Force Base, New Mexico.
1983-08-01
several years. A deteriorating black plastic liner was noted at the edge of the shallow pit. Approximately 4 to 6 inches of soil covered the rest of...subtotal/eximtm subtotal) 56 II. WASTE CARACTERISTICS A. Select the factor score based on the eatimeted quantity, the degree of hazard, and the...anticipated soil properties such as gradation, plasticity , or permea- bility by performing appropriate laboratory tests. In addition, soil samples may be
77 FR 45346 - Mid-Columbia Coho Restoration Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-31
...: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of availability of Record... monitoring and evaluation program. The ROD describes BPA's decision to fund the final phases of this program... the Columbia River. ADDRESSES: Copies of the ROD and EIS may be obtained by calling BPA's toll-free...
FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burger, Chris; Wortman, David; Brown, Chris
The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site restoration efforts are also documented in this report. All permit applications had been submitted to all agencies for those permits or approvals required prior to the start of project construction. Most of the requisite permits were received during Phase II. This report includes information on each permitting effort. Successes and lessons learned are included in this report that will add value to the next generation of carbon storage efforts.« less
Phased Retrofits in Existing Homes in Florida Phase I: Shallow and Deep Retrofits
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. Parker; Sutherland, K.; Chasar, D.
2016-02-01
The U.S. Department of Energy (DOE) Building America program, in collaboration with Florida Power and Light (FPL), conducted a phased residential energy-efficiency retrofit program. This research sought to establish impacts on annual energy and peak energy reductions from the technologies applied at two levels of retrofit - shallow and deep, with savings levels approaching the Building America program goals of reducing whole-house energy use by 40%. Under the Phased Deep Retrofit (PDR) project, we have installed phased, energy-efficiency retrofits in a sample of 56 existing, all-electric homes. End-use savings and economic evaluation results from the phased measure packages and singlemore » measures are summarized in this report.« less
Sequential Service Restoration for Unbalanced Distribution Systems and Microgrids
Chen, Bo; Chen, Chen; Wang, Jianhui; ...
2017-07-07
The resilience and reliability of modern power systems are threatened by increasingly severe weather events and cyber-physical security events. An effective restoration methodology is desired to optimally integrate emerging smart grid technologies and pave the way for developing self-healing smart grids. In this paper, a sequential service restoration (SSR) framework is proposed to generate restoration solutions for distribution systems and microgrids in the event of large-scale power outages. The restoration solution contains a sequence of control actions that properly coordinate switches, distributed generators, and switchable loads to form multiple isolated microgrids. The SSR can be applied for three-phase unbalanced distributionmore » systems and microgrids and can adapt to various operation conditions. Mathematical models are introduced for three-phase unbalanced power flow, voltage regulators, transformers, and loads. Furthermore, the SSR problem is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the modified IEEE 123 node test feeder.« less
Sequential Service Restoration for Unbalanced Distribution Systems and Microgrids
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Bo; Chen, Chen; Wang, Jianhui
The resilience and reliability of modern power systems are threatened by increasingly severe weather events and cyber-physical security events. An effective restoration methodology is desired to optimally integrate emerging smart grid technologies and pave the way for developing self-healing smart grids. In this paper, a sequential service restoration (SSR) framework is proposed to generate restoration solutions for distribution systems and microgrids in the event of large-scale power outages. The restoration solution contains a sequence of control actions that properly coordinate switches, distributed generators, and switchable loads to form multiple isolated microgrids. The SSR can be applied for three-phase unbalanced distributionmore » systems and microgrids and can adapt to various operation conditions. Mathematical models are introduced for three-phase unbalanced power flow, voltage regulators, transformers, and loads. Furthermore, the SSR problem is formulated as a mixed-integer linear programming model, and its effectiveness is evaluated via the modified IEEE 123 node test feeder.« less
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1991
1992-02-01
facility site cleanups. One key area where the Experts During FY 1991, 253 remedial ( AFB ), California; Fort Dix, New Groups are focusing attention...Dover AFB , Dela- process. Current approaches for is greater than the number of instal- ware; McChord AFB , Washington; selecting remedial approaches dis...lations, as more than one type of and Robbins AFB , Georgia. This courage new and unproven tech- action was taken at some brings to 12 the number of
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING
The Installation Restoration Program Toxicology Guide. Volume 3
1989-07-01
zvli UW OF TABLES Volun.e 4 (Cont.) 69-3 Chemical Additives ............................ 69-15 69-4 Acute Toxicity of Components of Mineral Base...659. Values were estimated by Arthur D. little, Inc. uwing Kow as the basis of estimation (See Introduction, VoL 1). Values of less than one are very...Introduction, Vol. 1). 659. Values were etfiinated by Arthur D. little, In~c. uwing Kow as the basis of. estimation (See Introduction, Vol. 1). Values of
2011-10-01
JBMDL’s flying mission. Installation Restoration Program (IRP), Hazardous Materials and Waste Management There are several IRP sites within the...McGuire airfield area; however, none are expected to impact the Proposed Action. Negligible impacts on hazardous materials management during tree clearing...would be expected as only minor quantities of hazardous materials are likely to be used. BMPs would be followed to minimize the possibility of a
1983-09-01
cold winters. Coldest temperatures ir. winter months are caused by high pressure systems which move rapidly dohn from central Canada cr Hudson Eay... dolomitic marble; or sand (30 to 60 feet), Glacial till (30 to 50 feet), and bedrock. The materials occurring above the bedrock in the vicinity of the...Trenton Group Iberville formation Noncalcareous black shale interbedded with 1000 dolomite . Stony point formation Predominantly calcareous black shale
1988-01-01
under field conditions. Sampling and analytical laboratory activities were performed by Ecology and Environment, Inc., and California Analytical...the proposed AER3 test conditions. All test samples would be obtained onsite by Ecology and Environment, Inc., of Buffalo, New York, and sent to...ensuring its safe operation. Ecology and Environment performed onsite verification sampling. This activity was coordinated with the Huber project team
Installation Restoration Program Records Search for George Air Force Base, California
1982-06-01
located in the Mojave Desert. The climate is arid with long hot summers and short cool winters. The mean 3relative humidity ranges from 27 percent in...abitat Native plant and animal comunities on base reflect the dry climatic conditions of an upland desert region. Along the eastern border of the bas...soil conditions because of a low ground- water table and the dry climatic conditions. While native systems are disrupted in the immediate vicinity of
1989-02-01
contaminated by past disposal practices. Sampling and analysis was not included in the PA. B. MAJOR FINDINGS The Air National Guard has utilized...with 23 Base personnel and the field surveys identified 3 potentially contaminated sites resulting from past disposal, storage, and/or spills and leaks...characteristic petroleum odor. With visible evidence of released contaminants , there is potential for contaminant migration by shallow groundwater. Site No. 3
Installation Restoration Program Records Search for MacDill Air Force Base, Florida.
1982-06-01
in Jun 1981 to identify the potential for contamination resulting from past disposal practices. On 26-27 Jan 82, representatives of USAF OEHL, AFESC...13 May 1979 8 Major Plant Communities at MacDill AFB III - 15 9 Location Map of Possible Contaminated Areas at IV - 21 MacDill AFB 10 Historical...RCRA) and implementing regulations. The purpose of the DOD policy is to control the migration of hazardous material contaminants from DOD
Installation Restoration Program Preliminary Assessment Bethel Radio Relay Station, Alaska
1989-04-01
third glacial stage of the Pleistocene * Epoch in North America . KNOB - A rounded eminence, as a knoll, hillock, or small hill or mountain. 3 KNOLL...Pleistocene Epoch in North America , after the Illinoian and before the Wisconsinan. SEDGE - Any of the family (Cyperaceae) of grasslike plants often found on...Pleistocene epoch in North America . I 3 GL-IO U I UREFERENCES 1. Department of the Interior List of Geological Survey Geologic and Water SupplY Reports
Installation Restoration Program Records Search for Mountain Home Air Force Base, Idaho.
1983-07-01
ornamental plantings. Mammals found on and around the base include coyote, black-tailed jackrabbit, cottontail, Franklin’s ground squirrel, and yellow - bellied ...Water Well Location Map. ::HILLI L - -- - • Depthin Feet Natural Ground Level Top Soil & Yellow Clay Subsoil Grey Basalt Rock-Medium Hardi30" Casing Grey... marmot as well as several varieties of small rodents. Birds which commonly nest on the base include American robin, house finch, English sparrow
1990-05-01
11140 Rockville Pike Rockville, Maryland 20852 Contract No. DLA 900-82-C-4426 Completed by Science & Technology, Inc. 704 South Illinois Avenue Suite C... Environments . .......... 111-19 IV. SITE EVALUATION...................v-i *A. Activity Review ................. v-i B. Disposal/Spill Site Identification...approximately 120 feet north of a small pond and creek located on the south side of the airport on airport property. The Base conducted operations at
1992-10-09
1 IG° _A--- -- 1-3 i I 0o20 IEL NFr onln $o pm~ nt FApoimare) 1-2oAproxmat Bend ofeofperable Units a clla F 1290-07S. 3-3 RADIAN i COmPORATION I (RI... Marketing Office (DRMO) for receipt, storage, and resale of useable materials. The western half of the lot has been used for this purpose since it was first
Vroblesky, Don A.; Casey, Clifton C.
2007-01-01
The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used innovative sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report evaluates a new type of pore-water sampler developed for this investigation to examine the subsurface contamination beneath the drainage ditch. The new type of pore-water sampler appears to be an effective approach for long-term monitoring of ground water in the sand and organic-rich mud beneath the drainage ditch.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parker, D.; Sutherland, K.; Chasar, D.
The U.S. Department of Energy (DOE) Building America program, in collaboration with Florida Power and Light (FPL), conducted a phased residential energy-efficiency retrofit program. This research sought to establish impacts on annual energy and peak energy reductions from the technologies applied at two levels of retrofit - shallow and deep, with savings levels approaching the Building America program goals of reducing whole-house energy use by 40%. Under the Phased Deep Retrofit (PDR) project, we have installed phased, energy-efficiency retrofits in a sample of 56 existing, all-electric homes. End-use savings and economic evaluation results from the phased measure packages and singlemore » measures are summarized in this report. Project results will be of interest to utility program designers, weatherization evaluators, and the housing remodel industry. Shallow retrofits were conducted in all homes from March to June 2013. The measures for this phase were chosen based on ease of installation, targeting lighting (CFLs and LED lamps), domestic hot water (wraps and showerheads), refrigeration (cleaning of coils), pool pump (reduction of operating hours), and the home entertainment center (smart plugs). Deep retrofits were conducted on a subset of ten PDR homes from May 2013 through March 2014. Measures included new air source heat pumps, duct repair, ceiling insulation, heat pump water heaters, variable speed pool pumps and learning thermostats. Major appliances such as refrigerators and dishwashers were replaced where they were old and inefficient.« less
Winchester Lake, Idaho (17060306) is an 85 acre recreation site located approximately 30 miles southeast of Lewiston. The lake has been involved in the U.S. EPA Clean Lakes Program since 1988. The Phase I Diagnostic and Feasibility Study, completed in February 1990, identified t...
A Three-Phase Microgrid Restoration Model Considering Unbalanced Operation of Distributed Generation
Wang, Zeyu; Wang, Jianhui; Chen, Chen
2016-12-07
Recent severe outages highlight the urgency of improving grid resiliency in the U.S. Microgrid formation schemes are proposed to restore critical loads after outages occur. Most distribution networks have unbalanced configurations that are not represented in sufficient detail by single-phase models. This study provides a microgrid formation plan that adopts a three-phase network model to represent unbalanced distribution networks. The problem formulation has a quadratic objective function with mixed-integer linear constraints. The three-phase network model enables us to examine the three-phase power outputs of distributed generators (DGs), preventing unbalanced operation that might trip DGs. Because the DG unbalanced operation constraintmore » is non-convex, an iterative process is presented that checks whether the unbalanced operation limits for DGs are satisfied after each iteration of optimization. We also develop a relatively conservative linear approximation on the unbalanced operation constraint to handle larger networks. Compared with the iterative solution process, the conservative linear approximation is able to accelerate the solution process at the cost of sacrificing optimality to a limited extent. Simulation in the IEEE 34 node and IEEE 123 test feeders indicate that the proposed method yields more practical microgrid formations results. In addition, this paper explores the coordinated operation of DGs and energy storage (ES) installations. The unbalanced three-phase outputs of ESs combined with the relatively balanced outputs of DGs could supply unbalanced loads. In conclusion, the case study also validates the DG-ES coordination.« less
A Three-Phase Microgrid Restoration Model Considering Unbalanced Operation of Distributed Generation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Zeyu; Wang, Jianhui; Chen, Chen
Recent severe outages highlight the urgency of improving grid resiliency in the U.S. Microgrid formation schemes are proposed to restore critical loads after outages occur. Most distribution networks have unbalanced configurations that are not represented in sufficient detail by single-phase models. This study provides a microgrid formation plan that adopts a three-phase network model to represent unbalanced distribution networks. The problem formulation has a quadratic objective function with mixed-integer linear constraints. The three-phase network model enables us to examine the three-phase power outputs of distributed generators (DGs), preventing unbalanced operation that might trip DGs. Because the DG unbalanced operation constraintmore » is non-convex, an iterative process is presented that checks whether the unbalanced operation limits for DGs are satisfied after each iteration of optimization. We also develop a relatively conservative linear approximation on the unbalanced operation constraint to handle larger networks. Compared with the iterative solution process, the conservative linear approximation is able to accelerate the solution process at the cost of sacrificing optimality to a limited extent. Simulation in the IEEE 34 node and IEEE 123 test feeders indicate that the proposed method yields more practical microgrid formations results. In addition, this paper explores the coordinated operation of DGs and energy storage (ES) installations. The unbalanced three-phase outputs of ESs combined with the relatively balanced outputs of DGs could supply unbalanced loads. In conclusion, the case study also validates the DG-ES coordination.« less
Phase III Early Restoration Public Meetings | NOAA Gulf Spill Restoration
Archive Home Phase III Early Restoration Public Meetings Phase III Early Restoration Public Meetings share Posted on December 6, 2013 | Assessment and Early Restoration Restoration Area Title: Phase III Early on the draft plan for the third phase of Early Restoration, which proposes more than $625 million in
40 CFR 90.113 - In-use testing program for Phase 1 engines.
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission control technology which most likely will be used on Phase 2 engines; (2) Engine families using... technology specifically installed to achieve compliance with emission standards of this part; (6) The engine... with itself or its vehicle manufacturer. (2) A test engine should have a maintenance history...
Department of Defense Data Model, Version 1, Fy 1998, Volume 1.
1998-05-31
INSTALLATION-POSTAL-ADDRESS INSTALLATION-RESTORATION- ADVISORY -BOARD INSTALLATION-SURVEY INSTALLATION-USPS-POSTAL-ADDRESS INSTALLMENT- PAYMENT ...Standards 5 U SECTION 5 Entity Report 6 SECTION 6 Attribute Report 7 SECTION 7 Entity Relationship Report 8 SECTION 8 DoD Data Model Enhancements Report ...8 SECTION 9 Functional Area Using Model Report 8 Appendix A IDEFlx Modeling Conventions 8 Appendix B Acronyms ; 8 Appendix
Installation Restoration Program Records Search for Langley Air Force Base, Virginia
1982-06-01
Septic Tanks at Langley Air Force Base 12 Location of Oil /Water Separators at Langley Air Force Base 13 Location Map of Possible Contaminated Area at...No. J.) and old vehicle dumping area (Site No. 15). A-17 Location of old underground fuel lines--possible oil -saturated area. vi FIGURES--Continued A...18 Location of old wastewater treatment plant at the Main Base Area (Site No. 2). A-19 Location of old underground oil storage tanks-possible oil
1991-03-29
I0IYOiHPI1 ISenu n!W .46 ,.II I J LIo Yg I 0 lf I IJliGn I r IM,I I.E_ I IVAna di mjdIIi ~ LaIIII j~inc zo- 20 III IT _______ di ~ ’n F-256 / ____CHZN...VJ is the lijit of detecticq fcr ’thit cvicmud. ba~ ern 1flutic-1. irdicates in estisated trice a lh ANAL Y ST :________________ OrRF.OED BY
1980-12-01
40.8 Sodium 70.1 Zinc 0.01 37 The process includes the following steps (Pichat et al., 1979): - neutralization precipitation (silicates, borates...Compressive Strength of Polyester - Encapsulated Sodium Sulfate Waste Composite ....... .............. 64 9. Deep Chemical Mixer Mounted on a Barge...zinc, copper, lead, manganese and tin; sodium salts of arsenate, borate, phosphate, iodate, and sulfide; and sulfate salts. Sulfate salts form calcium
Installation Restoration Program Records Search for Air Force Plant 4, Texas.
1984-08-01
treatment, landfills, waste oil pits, chrome and die yard pits, disposal and spill sites. A total of 20 sites were ranked using the HARM (Hazard...Meteorology Iii-i B. Physical Geography 111-3 C. Hydrology 111-24 D. Ecology 111-44 1. Habitat 111-44 2. Threatened or Endangered Species 111-45 IV. FINDINGS A...ASSESSMENT RATING METHODOLOGY K. SITE RATING FORMS L. GLOSSARY OF TERMS M. LIST OF ACRONYMS, ABBREVIATIONS, AND SYMBOLS USED IN THE TEXT N. REFERENCES 0
Installation Restoration Program. Records Search, Newark AFS, Ohio
1985-04-01
APPENDIX J - Aerial Photograph Newark Air Force Station . . . J-i i I I 1 I ! I iv I LIST OF TABLES No. Page 1 Potential Risk Ranking Based on Final HARM...accuracies of standards used at base level are directly traceable to the 3 Air Force Measurement Standards Laboratory at AGMC. The primary standards from...Approximately eight years ago the Base Exchange released it to the motor pool. Service is provided for all Air Force vehicles and equipment on the
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusetts, lies within the boundaries of the towns of Falmouth, Mashpee, Sandwich, and Bourne. The Area of Contamination (AOC) known as Chemical Spill 3 United States Coast Guard (CS-3 (USCG)) is located on Lee Road, in the south central portion of the MMR. The Air Force Center for Environmental Excellence (AFCEE) Installation Restoration Program Office at Otis Air National Guard (ANG) Base, Massachusetts.
Installation Restoration Program Records Search for Nellis Air Force Base, Nevada.
1982-06-01
VPAL3C CZaer:ori Sabt~rv* 1 0.22 (’tus qU~ijy PFA TWP"th’..y CSwbscore 2 0.30 plus .’.C.121 tieSakscoro x 0.24 plusTHIS ?AaE I’S B3SI QU . Fw.TV .r...Negative 4A.1 tion. Chicago 6. Illinois.) Flash Point. Tag Closed Cup. min 100’ F. 1380 F. 4.4.1 3. REQUIREMENTS1 Sulfuric add ab- sorption . max. ..- 5% 9
1991-11-22
the stewards of more than 25 million acres of land. Our military installations contain some of our Nation’s most sensitive and ecologically valuable...8 1 The Natural Resources Manager’s Role in the Superfund Program’s Ecological Risk Assessment M r. M att K lo...these cleanup sites are in remote parts of the country, and as such, were not of immediate concern for cleanup. Now that ecological restoration is a
Commander’s Guide to Public Involvement in the Army’s Installation, Restoration Program
1990-11-01
posed by chemicals at the local level and for dealing with emergencies within their communities. Industry is responsible for gathering information on the...helping set up procedures to handle chemical emergencies. At the federal level, EPA is responsible for ensuring that industry complies with the law’s...2816 Agana. GU 96910 011-671-734-2671 PUERTO RICO Environmental Quality Board 204 Del Parque Street Mail to: P.O. Box 11488 Santirce, PR 00910 (809) 725
1989-01-01
survey for the southern part of Washoe Ccunty provides data on sane physical and chemical properties of soils . The data deteied to be pertinent to on...base soils is presented in Table 3, Physical and Chemical Properties of Soils Occrring on the NVANG Base in Reno, Nevada. Analyses of surface water and...NVANG Base . . . ...... .. . .. . . 111-6 3. Physical and Chemical Prperties of Soils Occrring on the NVANG Base in Reno, Nevada
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
1993-06-30
agency (California Health and Safety Code [H&SC], Section 25179.6[a][2]). 1.2.5 Porter-Cologne Water Quality Act and Related Policies The Porter-Cologne...which endangers the comfort, repose, and health and safety of the public. SMAQMD Rule 403 requires that all reasonable precautions be taken not to cause...concentration values on Figures C-1 through C-IO. Differences in soil physical parameters, listed in Table C-2 for different compounds were questiotned
1990-12-01
Force ......,,...Human Systems Division (AFSC) .................. . . .. . . RP Pr ra -Offic (HSDIYAO) .............. ........... Brooks Air Force...intra- system piping. Six months to one year would be required to complete and integrate these components. EECA/021491/jlh 6-39 RADIAN COlVOR AT 1O IN... system capacity has been exceeded. It is a possibility that during severe storm events, the groundwater extraction wells will be shut down to avoid
1991-10-01
the Industrial Wastewater Collection System (IWCS) for leaks and analyzed wastewater passing through the wastewater lines (the IWL) at McClellan AFB (EG...Wastewater Collection System (IWCS) is a system of underground pipes and lift stations used to collect the wastewater from the various base processes...and work areas for treatment at one centralized Industrial Wastewater Treatment Plant (IWTP) located in OU C McClellan AFB. Most of the system is
Installation Restoration Program. Stage 1. King Salmon Airport , King Salmon, Alaska
1989-08-29
DESCRIPTION SOILS, SEDIMENTS , SLU_ SOLIDS TREATMENT ] CONSTITUENTS OR CON., SOLIDO /F/CATION, FIXATION" - STABILIZATION AND FIX/ STABILIZATION FORM...are consistently present in site media _il, sediment , surface, and ground-I waters), and are potentially toxic to humans and the eni--ent. Suggested...Seep IV-76 4.1.5.2.3 North Barrel Bluff IV-76 4.1.5.2.4 South Barrel Bluff IV-94 4.1.6 Sediment Investigation IV-94 4.1.6.1 Eskimo Creek Seep IV-94
1990-01-01
There are three above ground storage tanks for the storage of JP-4 jet fuel with ancillary piping, pumps, loading and unloading facilities, and...time daily basis. Workers are present to transfer jet fuel from delivery tncks to the storage tanks and from the storage tanks to fueling trucks...Ground-water flow and contaminant migration at Site 4, the fuel storage area, is generally toward the drainage ditch located immediately north of the
1991-10-01
during the RI; or to provide information for the determination that no further action is required if risks to human and environmental receptors are not...constitute an environmental risk . Exposure media and routes may differ between various organisms due to their physiological and behavioral differences...important species are relatively well documented. U Groundwater 3 Groundwater contaminants may constitute a risk to environmental receptors when
1992-04-15
an ofcial endorsement or approval of the use of such commercial products. This report may not be cited for purposes of advertisement . "EngineersM M7...Logs Appendix C. Laboratory Results of Soil Samples Appendix D. Concentration of Contaminants vs . Depth in Soils Appendix E. Lithologic Profiles of...dramatic difference in concentrations of explosives in areas outside the lagoons vs . concentrations beneath the lagoons. The results confirm that ES-I
Installation Restoration Program Records Search for Mather Air Force Base, California.
1982-06-01
Board, Central Valley Region Sacramento, California Mr. Stan Phillippe, Mr. Tom Pinkos, Mr. Bob Matteoli, Ms. Liese Schadt, Mr. Gregory Vaughn 916/ 322 ...Grant Ardell 916/ 322 -7166 7. California Department of Fish and Game Sacramento, California Mr. Jack Linn 916/355-7030 8. U.S. Fish and Wildlife Service...34 " A23 " Fire bluea sar.d ... ." ".......443 " S gra vel If additional space is :equired, continue on DWR Form No. 246-Soppement. -ind attach to zesp :sive
Mazur, Joan; Vincent, Stacy; Watson, Jennifer; Westneat, Susan
2015-01-01
This study with three Appalachian county agricultural education programs examined the feasibility, effectiveness, and impact of integrating a cost-effective rollover protective structure (CROPS) project into high school agricultural mechanics classes. The project aimed to (1) reduce the exposure to tractor overturn hazards in three rural counties through the installation of CROPS on seven tractors within the Cumberland Plateau in the east region; (2) increase awareness in the targeted rural communities of cost-effective ROPS designs developed by the National Institution for Occupational Safety and Health (NIOSH) to encourage ROPS installations that decrease the costs of a retrofit; (3) test the feasibility of integration of CROPS construction and installations procedures into the required agricultural mechanics classes in these agricultural education programs; and (4) explore barriers to the implementation of this project in high school agricultural education programs. Eighty-two rural students and three agricultural educators participated in assembly and installation instruction. Data included hazard exposure demographic data, knowledge and awareness of CROPS plans, and pre-post knowledge of construction and assessment of final CROPS installation. Findings demonstrated the feasibility and utility of a CROPS education program in a professionally supervised secondary educational setting. The project promoted farm safety and awareness of availability and interest in the NIOSH Cost-effective ROPS plans. Seven CROPS were constructed and installed. New curriculum and knowledge measures also resulted from the work. Lessons learned and recommendations for a phase 2 implementation and further research are included.
Advances in fertilization for hardwood regeneration
Douglass F. Jacobs
2013-01-01
Optimizing fertilization programs in the nursery and field may help improve regeneration and restoration of temperate deciduous hardwoods. Our research program has demonstrated the applicability of nutrient loading in fine hardwood systems to promote seedling uptake and storage of nutrients during the nursery phase. We also have shown the benefits of nutrient loading...
40 CFR 35.1603 - Summary of clean lakes assistance program.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and the State must certify that the lake project is consistent with the State Water Quality Management... quality, evaluate possible solutions to existing pollution problems, and recommend a feasible program to restore or preserve the quality of the lake. A Phase 2 cooperative agreement is to be used for...
Phase III of Early Restoration | NOAA Gulf Spill Restoration
information about this phase of Early Restoration, including fact sheets on each project. The final Phase III 44 projects are documented in a final Record of Decision. Information about Phase III of Early Archive Home Phase III of Early Restoration Phase III of Early Restoration Beach habitat would be restored
Restoration Advisory Board (RAB) Implementation Guidelines
This document provides recommended procedures for establishing and operating Restoration Advisory Boards (RABs). It is intended as a resource for installation, EPA, and State personnel and citizens who participate in RABs.
Analysis of the harmonics and power-factor effects at a utility-inertied photovoltaic system
NASA Astrophysics Data System (ADS)
Campen, G. L.
The harmonics and power factor characteristics and effects of a single residential photovoltaic (PV) installation using a line commutated inverter are outlined. The data were taken during a 5 day measurement program at a prototype residential PV installation in Arizona. The magnitude and phase of various currents and voltages from the fundamental to the 13th harmonic were recorded both with and without the operation of the PV system. A candidate method of modeling the installation for computer studies of larger concentrations is given.
1987-12-01
N1 4. j -0 z0 Uc n 41 or tD D, C a z 4s -J’ - - -T. = 3 CL Ct UL Cfl a-4 CL c r- 0CL U 4 -40 0 CL - :r j3 :) c c 0 0.’ 0- 1- 0 j c D4 C 4) 4 M 48= u...Ii el ozi - - 1 2 1 * ~ ~ ~ ~ L I.) z T L F-, ~ ~ - - *~~~~~ ~~ 093. j ,U .) . C- i n- zi -7 CD Z- c c c c c I a D- do 0. CL C a- JaJ - LA a) IC= -=1 -4...w N M’ it ’.o r’. M O’ 0 td M ’ 3aW 0 00 0 00 0 0 .- - .4 14 LaJ4 W4V L" Z- Z C3 1=z C= CD U IS LL L W N m’ t U) M 0. 0 . ’-U> CDn I-0 00CSI-W0C S6
Early Restoration | NOAA Gulf Spill Restoration
Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &
Phase V of Early Restoration | NOAA Gulf Spill Restoration
Phase V Early Restoration Plan and Environmental Assessment. The project will acquire land along Florida million. Phase V Early Restoration Plan and Environmental Assessment (pdf, 10 MB) Draft Phase V Early Restoration Plan and Environmental Assessment (Executive Summary) (2 MB) Phase V Fact Sheet (pdf, 2 MB) Gulf
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mousavian, Seyedamirabbas; Valenzuela, Jorge; Wang, Jianhui
2015-02-01
Ensuring the reliability of an electrical power system requires a wide-area monitoring and full observability of the state variables. Phasor measurement units (PMUs) collect in real time synchronized phasors of voltages and currents which are used for the observability of the power grid. Due to the considerable cost of installing PMUs, it is not possible to equip all buses with PMUs. In this paper, we propose an integer linear programming model to determine the optimal PMU placement plan in two investment phases. In the first phase, PMUs are installed to achieve full observability of the power grid whereas additional PMUsmore » are installed in the second phase to guarantee the N - 1 observability of the power grid. The proposed model also accounts for transmission switching and single contingencies such as failure of a PMU or a transmission line. Results are provided on several IEEE test systems which show that our proposed approach is a promising enhancement to the methods available for the optimal placement of PMUs.« less
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed, 2004-2005 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rasmussen, Lynn
2006-07-01
The ''Restoring Anadromous Fish Habitat in the Big Canyon Creek Watershed'' is a multi-phase project to enhance steelhead trout in the Big Canyon Creek watershed by improving salmonid spawning and rearing habitat. Habitat is limited by extreme high runoff events, low summer flows, high water temperatures, poor instream cover, spawning gravel siltation, and sediment, nutrient and bacteria loading. Funded by the Bonneville Power Administration (BPA) as part of the Northwest Power Planning Council's Fish and Wildlife Program, the project assists in mitigating damage to steelhead runs caused by the Columbia River hydroelectric dams. The project is sponsored by the Nezmore » Perce Soil and Water Conservation District. Target fish species include steelhead trout (Oncorhynchus mykiss). Steelhead trout within the Snake River Basin were listed in 1997 as threatened under the Endangered Species Act. Accomplishments for the contract period September 1, 2004 through October 31, 2005 include; 2.7 riparian miles treated, 3.0 wetland acres treated, 5,263.3 upland acres treated, 106.5 riparian acres treated, 76,285 general public reached, 3,000 students reached, 40 teachers reached, 18 maintenance plans completed, temperature data collected at 6 sites, 8 landowner applications received and processed, 14 land inventories completed, 58 habitat improvement project designs completed, 5 newsletters published, 6 habitat plans completed, 34 projects installed, 2 educational workshops, 6 displays, 1 television segment, 2 public service announcements, a noxious weed GIS coverage, and completion of NEPA, ESA, and cultural resources requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kinzey, B. R.; Myer, M. A.
2009-08-01
On the I-35W Bridge in Minneapolis, Minnesota, the GATEWAY program conducted a two-phase demonstration of LED roadway lighting on the main span, which is one of the country's oldest continuously operated exterior LED lighting installations. The Phase I report provides an overview of initial project results including lighting performance, economic performance, and potential energy savings.
Digital signal processing in the radio science stability analyzer
NASA Technical Reports Server (NTRS)
Greenhall, C. A.
1995-01-01
The Telecommunications Division has built a stability analyzer for testing Deep Space Network installations during flight radio science experiments. The low-frequency part of the analyzer operates by digitizing wave signals with bandwidths between 80 Hz and 45 kHz. Processed outputs include spectra of signal, phase, amplitude, and differential phase; time series of the same quantities; and Allan deviation of phase and differential phase. This article documents the digital signal-processing methods programmed into the analyzer.
Phase IV of Early Restoration | NOAA Gulf Spill Restoration
Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB
1989-10-01
of toluene in the gastrointestinal tract occurs less readily. Toluene is distributed in the highest concentrations to adipose tissue followed by bone...were desorbed using a thermal desorption unit. Samples were injected by a desorber into a capillary column which was followed by quantification with...0.002 beryllium 0.1 0.001 cadmium 0.5 0.005 chromium 1 0.01 copper 1 0.01 lead 3 0.002 mercury 0.02 0.001 nickel 2 0.02 selenium 0.2 0.002 silver 0.5
1989-02-01
contrac: b. Stitt b) Oklahoma L a) Motor housings, junction and switch boxes, ocher a. Arvua o be Avoided electrical equipment I b. Azau to beTreated w...REPORT DOCUMENTATION PAGE ! ,a,,mo i.,e0q 8 1. AGENCY USE ONLY ’ L -ave aianK) 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED l February 1989 Final...recommendations for further action. The subcontractor effort was conducted by the following Science & Technology, Inc. (SciTek) personnel: Mr. Tracy C. Brown
1982-03-01
plyethylene PVC landfill- HypalonM PE, CPE, neoprene, EPDM ,* bentqcnite ethylene propylene rubber elasticized polvoleiin 20. A94V C? (Coit" an 0*V" aid...materials include Hyralon®, butyl rubber , EPDM , CPE, neo- prene, polyethylene, polypropylene, PVC8 and elasticized polyolefin. With all of these...and animal and vegetable fats and oils (Geswein, 1975). EPDM , or etiylene propylene rubber , is a terpolymer of ethylene, propylene and a small amount
1991-03-29
laboratory. In addition, weather conditions (i.e., cloud cover, pre- cipitation, air temperature, and wind speed and direction), water clarity, and...carried over a 25-foot grid in this area. The weather at the time of emissions screening was mostly sunny with high clouds . The wind was 3 to 5 knots...TRIBUTARY TO HUTCHINSON CREEK SOIL GOMMIG ANGLED 300 FROM VERTICAL Ae o * SOL. 90011GM VERTICAL 0 100, o SURFACE SOIL SAMPLE AU. VALUES ARE IN mg/Kg MONITORIG
The Installation Restoration Program Toxicology Guide. Volume 2
1987-05-01
the number of extra responses made during exposure. An increase in response time 5/87 3V.WI UW V VýWVVWtW’.W1 VWJW.W W W VWVWW.WVVW MRVW W \\V -VW W i Ri...toxicity as shown by a decreased maternal weight gain. Minor anomalies in fetal development included an extra lumbar rib and delayed ossification of... lumbar spurs (57 vs. 18 in the control group) and a delayed vertebrae centra ossification (19 vs. 4 in the control group). No teratogenic response was
1990-01-01
reporting limit. Acceptable RPD in this case is defined as duplicate values within one detection limit of each other. I I I I I I i I i 2567I88-A1...analysis shois the :aboratory to be in ccn:rol. Results for Sa:Dle No. 88092.739 are reported on a wet weight basis, since percen:age moisture was...describes the remedial actions performed on sites confirmed to contain hazardous waste contamination which endangers the human health. The actions
1996-03-01
NATIONAL GUARD GENERAL BILLY MITCHELL FIELD AIR NATIONAL GUARD BASE MILWAUKEE, WISCONSIN MARCH 1996 ______ 19960509 134 HQ ANG/CEVR ANDREWS AFB...Report for IRP Site No. 4, Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin - Volume III...Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin, Volume III - Appendices D-I. This is the
1991-02-01
analysis of water, soil, and/or sediment samples, are required. Careful documentation and quality control procedures in accordance with CERCLA/SARA...I III-1 I I Northern Piedmont * AI Southern Piedmont a’.3 Cahaba Valley... ...... Coosa ValleyI Fall Line Hills Aluvial Plain Black Prairie3 Cu enu e...no surface outlet; (b) A drainage basin or river basin; (c) A low area in the Earth’s crust, of tectonic origin, in which sediments have accumulated
1990-05-01
DISSOLVED INORGANIC 4-16 CONSTITUENTS IN GROUNDWATER TABLE 4.1.8 CANCER CAUSING POTENTIAL OF CONTAMINATION 4-18 DETECTED AT ELMENDORF APB TABLE 4.1.9...TABLE 5-34 EXAMPLE CALCMATION OF EXCESS LIFETIME CANCER RISK 5-142 I DUE TO EXPOSURE TABLE 5-35 CONTAMINATION AND RISKS AT SITE IS-1 5-145 TABLE 5-36...sand. They occur on low terraces and in broad depressions . Slopes range from zero to 7 percent. o The Purches series consists of loamy-skeletal, mixed
1988-04-01
Liability Act of 1980 (CE2LA, Public Law 96-510) commonly known as "Superfund". In August 1981, the President delegated certain authority specified...to these wells. Two of these wells are no longer used. The well located about 200 feet southeast of Dilding 96 is listed as a public suply well by the...any organism, either directly fron the enviroamnt or , iirectly by ingestion through food chains , will or may reasonably be anticipated to cause death
1991-02-01
and the Upper Cambrian age Gatesburg formation crop out (Figure 111.3). Specifically, the Station location is shown to be underlain by the Stonehenge ...the Larke formation is generally absent in this part of Centre County, and a hiatus exists between the Stonehenge formation and the underlying Gatesburg...formation. Therefore, the Stonehenge formation exists unconformably in contact with the Mines member of the Gatesburg formation. In addition, the
1994-06-01
Loeltz, 1964, Evaluation of Hydroeeology and Hydrochemistry of the Truckee Meadow Area. Washoe County. Nevada. U. S. Geological Survey, Water I Supply...was detected in water samples collected from all monitoring wells. A concentration of I 0.055 ppm for the water sample collected from monitoring well...MWO8 during the first round of sampling (MW08-(1)), exceeded the federal drinking water standard of 0.05 ppm. The I background concentration for lead
1996-01-01
For: HQ/ANG/CEVR Andrews AFB, Maryland Prepared By: ERM-West, Inc. 5111. N. Scottsdale Road, Suite 108 ERM Scottsdale, Arizona 85250 FINAL Document...predominantly andesite and andesite porphyry flow rock, hypabyssal intrusives, and minor siliceous welded tuff, which are commonly represented by the Kate...TERTIARY ROCKSI tuslýýj porphyry and olcomic brii I SOURCE ORNL/ETS. 1994 GEOLOGIC MAP OF THE FIGURE 3-1 RENO. NEVADA AREA 152nd TACTICAL RECONNAISSANCE
1987-12-01
protection needs to be changed, then protection will be upgraded, or downgraded, as appropriate. 5 . Cartridges for air-purifying respirators will be...the gloves, the legs taped to the boots, and the hood to the respirator (if appropriate). All openings shall be sealed. 5 . The protective coveralls...placed next to the trash container. Note: Suits are to be removed in an inside out fashion. m. Station 5 - Respirator Removal A rack will be available to
1994-10-01
right side door. To minimize retinal exposure to UV, use UV protective eyeglasses and use the offset dental mirror to read the micrometer 6.7.4.3 To...States Air Force) Volatiles Analysis by GC/MS Method 8260 - (United States Air Force) Organochlorine Pesticides and PCBs by GC/ECD Method 8081...decreasing throughout the three or four exposures . The RSD will sometimes be higher than normal in these cases. Samples that are affected by possible carry
1990-07-01
trobenzen. 660’ ug/KG Phenacet in 6600 ug/KG 2- Picoline 660’ ug/KG Pronamide 10000 ug/KG 1,2,4, 5-Tetrachlorobenzene 660’ ug/KO 0 Denotes instrument...Phenacetin ND 2- Picoline ND Pronamide ND 1,26,4,5-Tetrachlorobenzene -*ND *EPA has not yet determined detection limits for these compounds E-158 I Pr...ND N-Nitrosopiperidine - ND Pentachlorobenzene ND Pentachloromitrobenzene -*ND Phenacetin ND 2- Picoline ND Pronamide - *ND 1,2,4,5
1989-01-01
Number DAAK- 1 1 -85-D-007 Report Number CETHA-TE-CR-89006 January 1989 Prepared for: COMMANDER, U.S. ARMY TOXIC AND HAZARDOUS MATERIALS AGENCY Aberdeen...UNIT Aberdeen Proving Ground, MD 21010-5401 ELEMENT NO. NO. NO. ACCESSION NO. 1 . TITLE (Include Security Classification) - Biodegradation of DIMP...TYPE OF REPORT 113b. TIME COVERED 114. DATE OF REPORT (Year, Month, Day) 15. PAGE COUNT Final I FROM 1 /87 TO_1/89 1989 January 30 6. SUPPLEMENTARY
1991-11-01
R A DIA N.... cCELA AFB CALIFRNI55259......... ... RADIAN C 0 37 54 0 z is T 1 0 10395 Old Placcrvillc Road Sacramcnto, CA 95827 191461362-5 H3 2...SAME AS r __ OTic usERs Undlassified 22a. NAME OF RESPONSIBLE INDIVIDUAL 22b. TELEPHONE oncoude Area Code) 22c. OFFICE SYMBOL Mr. P. Haas 1 -800-821...Page 1.0 INTRODUCTION .................................... . 1 - 1 2.0 SITE DESCRIPTION .................................. 2- 1 2.1 Type of Facilities
Installation Restoration Program. Stage 3. McClellan Air Force Base. Quality Assurance Project Plan
1990-03-01
Dibromomethane 5.0 trans- 1,2-Dichloropropene 5.0 1,2-Dibromoethane 4.8 total- 1,4-Dichlorobutene 2.6 Methyl methacrylate 28 1,1, 1,2-Trichloropropane 3.9...trans- 1,2-DCE); • Methyl ethyl ketone (MEK); • Carbon disulfide; • Dichlorobenzene; * Chloroform; and * Methylene chloride. Contaminants reported in soil...2-Hexanone 10 4- Methyl -2-pentanone 10 Tetrachloroethene 4.1 1, 1,2,2-Tetrachloroethane 5.0 Toluene 5.0 Chlorobenzene 5.0 Ethylbenzene 5.0 Styrene 3.0
Installation Restoration Program Records Search for McChord Air Force Base, Washington.
1982-08-01
responsible for smoke testing for possi- ble outlets. g ŕ 115 0 V -j q * REFERENCES * .4 g SI * I w I WI j EU REFERENCES Brandin , R. M., and S. Sgt. S. A...Ms. R. Brandin . Griffin, W. C., et al. 1962. Water Resources of the Tacoma Area Washington. Geological Survey Water Supply Paper 1499-B. Prepared in...MEMBERS vS U STEVEN R. HOFFMAN Education B.S., Civil Engineering, South Dakota School of Mines and Technology, 1971 Experience - -. Mr. Hoffman is a
1989-10-01
Coord: Elev.PROTECTIVE CSG He~qht I Material /Type El e~. ________Diameter Elie.hI____ Depth BGS ___________Weep Hole (YIN) HSe.ht __ GUARD POSTS (YIN...Tremied I Y/14) SCR EE N Type Dimeter - --Slot Size Ck Type SUMP (YIN) Interval OGS Lcngth - 90tt0m Cop (YIN) BACKFILL PLUG Material ...for transport to the laboratory. The remaining liners will then be extruded and the material used for lithologic description and other analyses. The
1987-10-01
about 3 inches thick. The subsoil is light yellowish-brown, fine sandy loam, 25 inches thick, under- lain by a buried subsoil of brown clayey loam, 17...inches thick and brown very gravelly sandy loam to 60 inches or more. Fine lime filaments occur in the . buried subsoil. Permeability of the...18 Paq * 2 of FU. PATHWAYS factor taximum, p Rating Factor Possble Rating Factor (0-3) Multiplier Score Score A. If there is evidence of migration of
1987-09-01
these wetlands. Because of the generally low relief at the Base, several manmade drainage ditches have been constructed to improve surface water ...northerly boundary (Hickock, 1985). Within the Marshall Formation, the water table or piezometric surface con- forms somewhat to the land surface. The...34hills" in the water table underlie hills seen on land. The " lows " in the water table coincide with low areas on land (Vanlier, 1966). Thus, the
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the selected remedial actions for the Landfill OU Sites, at the inactive Mather AFB, Sacramento County, California. The Installation Restoration Program (IRP) sites which comprise the Landfill OU at the inactive Mather AFB include: Site 1 - Runway Overrun Landfill; Site 2 - `8150` Area Landfill; Site 3 - Northeast Perimeter Landfill No. 1; Site 4 - Northeast Perimeter Landfill No. 2; Site 5 - Northeast Perimeter Landfill No. 3; and Site 6 - Firing Range Landfill Sites.
Installation Restoration Program Records Search for Richards-Gebaur Air Force Base, Missouri.
1983-03-01
Richards-Gebaur AFB is located on the King anticline, a structural rise favorable for oil and gas production and the oldest gas -producing area in Cass... Oil and Gas Section Chief Don Miller, Ground Water Section Chief 314/364-1752 10. Missouri Department of Natural Resources Kansas City, Missouri Jim...tha uthe United states USMrce sac.. the Ne’lowf Ut of OMVieead this reprt my he rmfau Notsma" I9eb6isuL ?UE service SW~ Partlw Iptbf ll. Yi~taa, T21
1982-09-01
parallei studies ý7.fLtoring TNT and liDX disappearance in laboratory scale (50 g dry weight) and greenhouse (10 kg dry weight) compost,. An additional...occurred during composting. The greenhouse compost studies demonstrated a very rapid decrease in the TNT concentration. At the three week sampling time...material was below the detecuion limit of 16.9 ppm. Greenhouse composting of RDX resulted in a 61% reduction in the RDX concentration after three weeks
1983-06-01
NOTES 19. KEY WORDS (Continue on reveree side if necesaary and Identify by block number) Neoprene Synthetic Liners TCE, XR-5, EPDM Hypalon Compatibility...CPE, Hypalon , XR-5, HDPE, Neoprene, and EPDM ) were immersed in TNT, RDX, and TCE solutions for I week. Liner and test .*. method selection and data...Mean Weight Change Values - EPDM /Neoprene Group 57 Unexposed and in Distilled Water 7 Mean Weight Change Values - PVC Group in Distilled 58 Water and in
Phase 1 results from the Stirling-powered vehicle project
NASA Technical Reports Server (NTRS)
Shaltens, Richard K.
1988-01-01
The NASA Technology Utilization (TU) Office is sponsoring a multiyear, multiphase demonstration program to assess the technology developed under the DOE/NASA automotive Stirling engine (ASE) program with engines installed in various Air Force vehicles while being evaluated by independent third parties under realistic conditions. This paper reviews the operational history of Phase 1 with a Mod 1 Stirling engine installed in an Air Force multistop van in a variety of missions. Ten months of operation were with Air Force personnel at Langley Air Force Base, Virginia, where over 1100 hr and 4000 mi were logged on the Langley flight line. The Stirling-powered van operated on unleaded gasoline, JP-4 aircraft fuel, and diesel fuel at Langley Air Force Base. Two months of operation were completed with Deere and Company personnel in the Moline, Illinois area where over 175 hr and 2650 mi were logged on a Deere mail delivery route.
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
Evaluation of a concrete pavement restoration project in Virginia.
DOT National Transportation Integrated Search
1994-01-01
The purpose of this Federal Highway Administration Demonstration Project was to evaluate the installation and performance of a section of I-81 in Botetourt County, Virginia, that was rehabilitated by concrete pavement restoration (CPR) methods. The s...
1987-11-01
Benthic Macroinvertebrate Program. This program monitors water . quality at stations located in the Bush, Gunpowder, Patapsco, Patuxent, Potomac, Magothy ...Western Shore include the Severn, Magothy , Patapsco, Middle, Back, Gunpowder, and Bush Rivers. They col- lectively drain 2.5% of the basin and
Improving design phase evaluations for high pile rebound sites : final report.
DOT National Transportation Integrated Search
2016-05-31
A testing program performed to help determine typical soils properties encountered during pile installation when high rebound : occurs produced a decision matrix for geotechnical engineers. High pile rebound (HPR) occurred at numerous sites in Florid...
Formal Environmental Assessment for the R-2508 Complex Enhancement Program. P.E. 35126F
1978-04-01
PHASE III. A sixth unmanned gap-filler radar sytem will be installed-at Indian Wells Valley and a new long-range radar system may be installed at...SITE TOPCGRAPHiIC ~ao It S. 4.. , I -’ I , ,- I IL? OM " 17291< II - 11 • ~M 1687 , .90~ " , " ,-""/ aBM \\ t 9CI :52 otu I1era!40fet o Al 0o , I, , t
James M. Guldin; John Strom; Warren Montague; Larry D. Hedrick
2004-01-01
National Forest managers in the Interior Highlands of Arkansas are restoring 155,000 acres of unburned shortleaf pine stands to shortleaf pine-bluestem habitat. Habitat restoration consists of longer rotations, removal of midstory hardwoods, and reintroduction of fire. A study was installed in the spring of 2000 to evaluate shortleaf pine regeneration and overstory...
NASA Astrophysics Data System (ADS)
Yarnell, S. M.; Pope, K.; Podolak, K.; Wolf, E.; Burnett, R.
2016-12-01
Due to extensive livestock grazing and widespread removal of beaver and willows, headwater meadows have transformed from multi-thread channels with seasonally active floodplains into single thread, incised channels that store less carbon, retain less water, and are lower in habitat quality for a diverse suite of meadow-dependent wildlife. Meadow restoration techniques often include willow planting and cattle exclosures; however, few studies have rigorously tested the long-term efficacy of these methods or evaluated alternative restoration techniques such as reintroduction of beaver or installation of beaver dam analogues (BDAs). This project seeks to evaluate the installation of BDAs as a restoration technique in Childs Meadow, a heavily grazed meadow in the Cascade Range representative of low-gradient meadows across northern California. Using a before-after-control-impact study design, the study tests the impacts of two restoration techniques (willow planting with cattle exclusion and willow planting with cattle exclusion and BDAs) on hydrology, carbon sequestration, and sensitive species. Results will be compared with measurements in an unrestored section of the meadow that currently supports an active beaver population and two imperiled species (Cascades Frog and Willow Flycatcher). One specific project objective is to measure the response of hydrogeomorphic conditions (e.g. groundwater, surface water, temperature, habitat) and Cascades Frog and Willow Flycatcher to restorative actions. Pre-treatment data was collected in summer 2015, a cattle exclosure was established and willows were planted in fall 2015, and installation of the BDAs is planned for fall 2016. Three years of post-implementation monitoring will be completed to assess impacts of the treatments. Here, we will present our sampling design and first year results following initiation of the treatments.
Refan program. Phase 1: Summary report
NASA Technical Reports Server (NTRS)
Sams, E. W.; Bresnahan, D. L.
1973-01-01
The Refan Program is aimed at a large reduction in aircraft approach and takeoff noise in the vicinity of airports caused by the JT3D-powered 707's and DC-8's and the JT8D-powered 727's, 737's and DC-9's. These aircraft represent a major part of the existing commercial fleet. The noise reductions can be achieved by engine and nacelle modifications in the form of aircraft retrofit kits. Engine turbomachinery noise is reduced by replacing the current two-stage fan with a larger single-stage fan and by nacelle acoustic treatment. Jet noise is reduced by the reduction on jet velocity caused by additional turbine work extraction to drive the larger bypass fan. The predicted net effect of these modifications on installed performance is large noise reductions on both approach and takeoff, increased takeoff thrust, decreased takeoff field length, and maintained or improved aircraft range depending on the amount of acoustic treatment included. The Refan Program is being conducted in two phases under contracts with one engine and two airframe companies. Results of the Phase I work are summarized in this report which describes the refan nacelle configurations studied, the airplane modifications required to install the nacelles, and the resulting airplane performance and noise reductions predicted for all five aircraft.
[Complex program for the recovery of the vertebral column motor function].
Kukareko, V P; Furmanov, A G
2011-01-01
This paper addresses the problems pertinent to the improvement of the efficacy of restoration of the vertebral column motor function based on the implementation of a comprehensive therapeutic program including massage, thermal procedures, and physical exercises. The program was realized in three phases, viz. preparatory, basic, and consolidating. The results of integral estimation of the whole body and vertebral column condition were taken into consideration. The experiment lasted 6 months and confirmed high efficiency of the comprehensive program.
Improvement of driven pile installation and design in Illinois : phase 2.
DOT National Transportation Integrated Search
2014-09-01
A dynamic load test program consisting of 38 sites and 111 piles with restrikes was conducted throughout Illinois : to improve the Illinois Department of Transportation design of driven piling. Pile types included steel H-piles and : closed-ended pip...
DOT National Transportation Integrated Search
2016-08-01
The Participant Training and Stakeholder Education Plan is a high-level plan for the recruitment and training of all automobile drivers, pedestrians, transit drivers, traffic management center (TMC) operators, and installation and maintenance technic...
Robotics and telepresence for moon missions
NASA Technical Reports Server (NTRS)
Sallaberger, Christian
1994-01-01
An integrated moon program has often been proposed as a logical next step for today's space efforts. In the context of preparing for the possibility of launching a moon program, the European Space Agency is currently conducting an internal study effort which is focusing on the assessment of key technologies. Current thinking has this moon program organized into four phases. Phase 1 will deal with lunar resource exploration. The goal would be to produce a complete chemical inventory of the moon, including oxygen, water, other volatiles, carbon, silicon, and other resources. Phase 2 will establish a permanent robotic presence on the moon via a number of landers and surface rovers. Phase 3 will extend the second phase and concentrate on the use and exploitation of local lunar resources. Phase 4 will be the establishment of a first human outpost. Some preliminary work such as the building of the outpost and the installation of scientific equipment will be done by unmanned systems before a human crew is sent to the moon.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Branch, Kristi M.; Bradbury, Judith A.
This article is part of a growing body of literature evaluating public participation approaches and implementation efforts. It compares the characteristics and performance of citizen advisory boards established by the U.S. Department of Energy's Environmental Restoration and Waste Management Program (DOE/EM) and by the U.S. Department of Defense's Army (DoD/Army) as a major part of the public participation programs that were undertaken to help the agencies plan and implement the cleanup of their contaminated installations. We first present the elements of the Acceptability Diamond, an evaluative framework developed by the authors through extensive fieldwork on public-federal agency interactions that identifymore » five objectives of agency/public interactions and public participation programs, and link them to existing literature. We then use the Acceptability Diamond as a basis for comparing the performance of the DOE/EM and DoD/Army advisory boards. In the early 1990s, both DOE and DoD participated in the Federal Facilities Environmental Restoration Dialogue Committee (known as the FFER Dialogue Committee) and were influenced by the Committee's recommendations on public participation. However, the Site Specific Advisory Boards (SSABs) subsequently established by DOE/EM and the Restoration Advisory Boards (RABs) subsequently established by DoD and the Army were governed by significantly different policies and management. We describe some of these key differences and compare the performance of the SSABs and RABs. The article draws on a series of research studies conducted by the authors on the DOE/EM public participation program from its inception in the early 1990s through its transition to accelerated cleanup in 2002 and also on a recently completed study of seven Army RABs.« less
Defense Environmental Restoration Program Annual Report to Congress for Fiscal Year 1992.
1993-04-02
5. Eielson AFB , AK 24,336 159,535 6. Ellsworth AFB , SD 8,521 63,000 7. Elmendorf AFB , AK 23,227 107,263 8. Fairchild AFB (4 Waste Areas), WA 13,738...HRS Score (Latest) FY 92 FY 92 Status Year AIR FORCE (Continued) 7. Eielson AFB AK 48.14 92 7,055 14,799 FIN 91 8. Ellsworth AFB SD 33.62 91 690 7,831...decided at their October 7, 1992 cleanup decisions at Air Force meeting to recommend the use of . Andersen AFB , Guam installations. As part of the first
1990-01-01
DATA job No.: OROOl Calibration Date: 8-19-88 Instrument I.D.: Perkin Elmer 257 Client: ES Oak Ridge Grating Infrared Spectrophotometer Attn: Bill...ilh (2 2 ___ UPPER I LIMIT__ I/ LOWER I0 I 9 I LIMIT_ I -00 I o0 WW2 1EPA SAMPLE] I No. I I I---. ...I I .. .. - ==== =---I 01- J ox.9oJ wqIJ~%o S... Infrared Spectrophotometer Attn: Bill Hayden Address: 710 S. Illinois Avenue Unit: mg/L Suite F-103 Date Reported: 11-09-88 Oak Ridge, Tn. 37830 R
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
1990-01-01
Selection of Indicator Chemicals 6-36 6.2.2 Estimation of Exposure Point Concentrations or Emission Rates 6-38 6.2.2.1 Exposure Pathway Analysis 6-38...Exposure Point Concentrations or Emission Rates 6-50 j 6.3.2.1 Exposure Pathway Analysis 6-52 6.3.2.2 Exposure Point Concentrations 6-55 6.3.2.3...Exposure Point Concentrations or Emission Rates 6-62 6.4.2.1 Exposure Pathway Analysis 6-62 6.4.2.2 Exposure Point Concentrations 6-69 6.4.2.3
1989-11-01
at a Superfund site in Puerto Rico to ascertain the alleged extent of mercury contamination. C.C. Johnson & Malhotra. P.C. (1985-1988): Environmental...industrial hygiene and training, as well as other environmental matters. 3 DETOX , Inc. (1986): Manager, Technical Services Responsible for the...computer and CAD operations, and company R&D efforts. DETOX , Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United
1989-09-01
STEEL STL STEEL TFL TEFLON TIL TILE WD WOOD WRI WROUGHT IRON Z OTHER A-14 coam Bc~ai=L a TEST PIT ois rn iEI AR AIR - ROTARY 8 BORED OR AUGERED C CABLE-TOOL...CO CORING Cs CHILLED SHOT D DUG DH DOWN THE HOLE HAMMER HA HAND AUGERED HS HOLLOW STEM AUGER J JETTED MR DIRECT CIRCULATION ROTARY , MUD p AIR ...INSTITUTE WARI WATER AND AIR RESEARCH. INC. WIL WILSON AND CO. A-18 M 0E 7 PIT E V/n.. CK: N’Y ESCI ENGINEERING -SCIENCE NA NOT APPLICABLE RB MR
1987-10-01
3 I, UNLSSflD r/ H : . ,_ .m 0 1 -8 111 . ! m m’" , L . I-~*211111220 MICROCOP RESOLUTICN TEST CHART NATIONAL BUREAU 0I SANDARD ’l l 4 AtJLLW i V...include, but not be limited to, any element, substance, compound , or mixture, including disease- causing agents, which after release into the environment...under: (a) any substance designated pursuant to Section 311(b)(2)(A) of the Fed-- eral Water Pollution Control Act, (b) any element, compound , mixture
1990-09-01
Initially, cuttings from the borings and wells will be placed on plastic sheeting, covered, and left at the drilling site until a determination can be...Spwmxds Solids (K160.2) X X X X X Nitrate - Nitrate (PE3M.1) X X X X X tPhysical Caracteristics : Soil Enginering Classificatim X X X X X X X X (MQ8-84...site, soil cuttings from drilling the borings and wells will be placed on a plastic tarp and covered until samples of the soil have been screened using
1988-12-01
nuclear disintegration of certain elements and isotopes, with the emission of radiation, radiant energy capable of affecting living tissue. RADIUM - A...Corrosion Control. Waste oils, recovered fuels , spent cleaners, strippers, and solvents are * generated by these shops. ES-i mIs- Interviews with past...HAS-73) A defueling pit is located north of the old alert hangar (Building No. 241). Excess JP-4 fuel in the F-100 aircraft was dumped into the pit
2011-06-01
Pulido, Environmental Restoration Program Manger, Nellis AFB, Henry Rodriguez , Toxics Program Manger, Nellis AFB, John Roe, Water Quality Program...TESTING February 14, 2011 Hunt Building Company Inc. Mr. John Leidolf 4401 N Mesa El Paso, TX 79902 Re: Clearance Letter for Parcel H, 1 & 2...Prepared for: Mr. John Leidolf Hunt Building Company, LTD. 4401 N. Mesa St. El Paso, TX 79912 Project: Nellis Air Force Base Salmon Street
The American mobile satellite system
NASA Technical Reports Server (NTRS)
Garner, William B.
1990-01-01
During 1989, the American Mobile Satellite Corporation (AMSC) was authorized to construct, launch, and operate satellites to provide mobile satellite services (MSS) to the U.S. and Puerto Rico. The AMSC has undertaken three major development programs to bring a full range of MSS services to the U.S. The first program is the space segment program that will result in the construction and launch of the satellites as well as the construction and installation of the supporting ground telemetry and command system. The second segment will result in the specification, design, development, construction, and installation of the Network Control System necessary for managing communications access to the satellites, and the specification and development of ground equipment for standard circuit switched and packet switched communications services. The third program is the Phase 1 program to provide low speed data services within the U.S. prior to availability of the AMSC satellites and ground segment. Described here are the present status and plans for these three programs as well as an update on related business arrangements and regulatory matters.
7 CFR 1467.10 - Cost-share payments.
Code of Federal Regulations, 2010 CFR
2010-01-01
... restrictions on the costs of establishing or installing conservation practices or activities specified in the... easement, 30-year contract, or restoration cost-share agreement, NRCS will offer to pay at least 50 percent... entity may receive, directly or indirectly, for one or more restoration cost-share agreements, for any...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...
Phase change thermal storage for a solar total energy system
NASA Technical Reports Server (NTRS)
Rice, R. E.; Cohen, B. M.
1978-01-01
An analytical and experimental program is being conducted on a one-tenth scale model of a high-temperature (584 K) phase-change thermal energy storage system for installation in a solar total energy test facility at Albuquerque, New Mexico, U.S.A. The thermal storage medium is anhydrous sodium hydroxide with 8% sodium nitrate. The program will produce data on the dynamic response of the system to repeated cycles of charging and discharging simulating those of the test facility. Data will be correlated with a mathematical model which will then be used in the design of the full-scale system.
Command History. United States Military Assistance Command, Vietnam 1968. Volume 2
1968-01-01
phase of the 1968 plan was put through ae scheduled. The opening of the Tte Offensive. however, temporarily scuttled the program. Temporarily, local...decrease slightly. Completed construction of an additional 1, 200 km oalhighways and tte restoration of more of the VNRS was expected to materialize in...Assistance Program MINRON Mine Squadron \\05 Military Intelligence Service MISC Mobile Infiltration Surveillance Center MIUWG Mobile Inshore Undersea
US army land condition-trend analysis (LCTA) program
NASA Astrophysics Data System (ADS)
Diersing, Victor E.; Shaw, Robert B.; Tazik, David J.
1992-05-01
The US Army Land Condition-Trend Analysis (LCTA) program is a standardized method of data collection, analysis, and reporting designed to meet multiple goals and objectives. The method utilizes vascular plant inventories, permanent field plot data, and wildlife inventories. Vascular plant inventories are used for environmental documentation, training of personnel, species identification during LCTA implementation, and as a survey for state and federal endangered or threatened species. The permanent field plot data documents the vegetational, edaphic, topographic, and disturbance characteristics of the installation. Inventory plots are allocated in a stratified random fashion across the installation utilizing a geographic information system that integrates satellite imagery and soil survey information. Ground cover, canopy cover, woody plant density, slope length, slope gradient, soil information, and disturbance data are collected at each plot. Plot data are used to: (1) describe plant communities, (2) characterize wildlife and threatened and endangered species habitat, (3) document amount and kind of military and nonmilitary disturbance, (4) determine the impact of military training on vegetation and soil resources, (5) estimate soil erosion potential, (6) classify land as to the kind and amount of use it can support, (7) determine allowable use estimates for tracked vehicle training, (8) document concealment resources, (9) identify lands that require restoration and evaluate the effectiveness of restorative techniques, and (10) evaluate potential acquisition property. Wildlife inventories survey small and midsize mammals, birds, bats, amphibians, and reptiles. Data from these surveys can be used for environmental documentation, to identify state and federal endangered and threatened species, and to evaluate the impact of military activities on wildlife populations. Short- and long-term monitoring of permanent field plots is used to evaluate and adjust land management decisions.
2008-01-01
ERP) that is managed by the Restoration Program Manager (RPM) of the 99 CES/CEVR. Category 4 – Remedial action required and taken. Property where...are listed below and summaries of their interviews are presented in Appendix E. Mr. D.J. Haarklau, 99 CES/CEVC, Environmental POLs Program Manager ...Mr. Haarklau, who has been the POLs Program manager for 10 years, provided GSRC with information pertaining to reportable quantity spills that have
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greilling, R.W.; Peshkin, R.L.
1985-12-20
An IRP Phase II (Stage 1) Confirmation/Quantification Investigation was performed in the American Lake Garden Tract residential community as a consequence of previously confirmed groundwater contamination by like compounds both in the Garden Tract and on McChord AFB. A similar type of groundwater problem was believed to exist at the opposite end of the residential area, and may possibly be related to Army operations on Fort Lewis. The field study was designed to identify the type, quantity, and extent of groundwater contamination by expanding the study area to include all of the Garden tract, the entire west half of McChordmore » AFB, and the northern one-third of the Fort Lewis Logistics Center. Field investigations consisted of 58,000 lineal feet of self-potential and 24,000 lineal feet of seismic refraction surveys. Forty electrical resistance stations were established. Twenty-six two-inch-diameter monitoring wells were constructed. More than 225 water samples from more than 60 EPA, Army, and Air Force monitoring wells, plus domestic water-supply wells were characterized for volatile organic chemicals. All wells were sounded at least weekly for static water levels, and in-situ hydrochemical properties were monitored. Study results confirm independent sources of chlorinated hydrocarbon contamination exist on each military facility, and that these contaminants are migrating into different parts of the American Lake Garden Tract.« less
Phase III Early Restoration Meeting | NOAA Gulf Spill Restoration
Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News Publications Press Releases Story programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
Phase III Early Restoration Meeting - Pensacola, FL (rescheduled) | NOAA
Restoration Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
2007-11-01
INSTALLATIONS IN THE CHESAPEAKE BAY WATERSHED IDENTIFICATION AND CONTROL METHODS Cogongrass ( Imperata cylindrica ) Description & Biology – A large...Crown vetch Coronilla varia MD, VA 14 Leafy spurge Euphorbia esula VA 15 Ground ivy Glechoma hederacea DC, MD, PA, VA, WV 17 Cogongrass Imperata
CAPABILITY TO RECOVER PLUTONIUM-238 IN H-CANYON/HB-LINE
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-01-09
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np-237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-anyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase-3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ~ 2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase-1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashwood, T.L.; Spalding, B.P.
1991-07-01
This report presents the results and conclusions from a multifaceted monitoring effort associated with the high-density polyethylene caps installed in Solid Waste Storage Area (SWSA) 6 at Oak Ridge National Laboratory (ORNL) as an interim corrective measure (ICM). The caps were installed between November 1988 and June 1989 to meet Resource Conservation and Recovery Act (RCRA) requirements for closure of those areas of SWSA 6 that had received RCRA-regulated wastes after November 1980. Three separate activities were undertaken to evaluate the performance of the caps: (1) wells were installed in trenches to be covered by the caps, and water levelsmore » in these intratrench wells were monitored periodically; (2) samples were taken of the leachate in the intratrench wells and were analyzed for a broad range of radiological and chemical contaminants; and (3) water levels in wells outside the trenches were monitored periodically. With the exception of the trench leachate sampling, each of these activities spanned the preconstruction, construction, and postconstruction periods. Findings of this study have important implications for the ongoing remedial investigation in SWSA 6 and for the design of other ICMs. 51 figs., 2 tabs.« less
Chen, Ching-Ho; Wu, Ray-Shyan; Liu, Wei-Lin; Su, Wen-Ray; Chang, Yu-Min
2009-01-01
Some countries, including Taiwan, have adopted strategic environmental assessment (SEA) to assess and modify proposed policies, plans, and programs (PPPs) in the planning phase for pursuing sustainable development. However, there were only some sketchy steps focusing on policy assessment in the system of Taiwan. This study aims to develop a methodology for SEA in Taiwan to enhance the effectiveness associated with PPPs. The proposed methodology comprises an SEA procedure involving PPP management and assessment in various phases, a sustainable assessment framework, and an SEA management system. The SEA procedure is devised based on the theoretical considerations by systems thinking and the regulative requirements in Taiwan. The positive and negative impacts on ecology, society, and economy are simultaneously considered in the planning (including policy generation and evaluation), implementation, and control phases of the procedure. This study used the analytic hierarchy process, Delphi technique, and systems analysis to develop a sustainable assessment framework. An SEA management system was built based on geographic information system software to process spatial, attribute, and satellite image data during the assessment procedure. The proposed methodology was applied in the SEA of golf course installation policy in 2001 as a case study, which was the first SEA in Taiwan. Most of the 82 existing golf courses in 2001 were installed on slope lands and caused a serious ecological impact. Assessment results indicated that 15 future golf courses installed on marginal lands (including buffer zones, remedied lands, and wastelands) were acceptable because the comprehensive environmental (ecological, social, and economic) assessment value was better based on environmental characteristics and management regulations of Taiwan. The SEA procedure in the planning phase for this policy was completed but the implementation phase of this policy was not begun because the related legislation procedure could not be arranged due to a few senators' resistance. A self-review of the control phase was carried out in 2006 using this methodology. Installation permits for 12 courses on slope lands were terminated after 2001 and then 27 future courses could be installed on marginal lands. The assessment value of this policy using the data on ecological, social, and economic conditions from 2006 was higher than that using the data from 2001. The analytical results illustrate that the proposed methodology can be used to effectively and efficiently assist the related authorities for SEA.
1988-01-01
the reactor Duties: The Process Engineers rotate with the Lead Operator to monitor the process at the top of the reactor through the site glass...pant cuffs and coverhoods of coveralls, will be attached to gloves, boots and coveralls, using duct tape. * IF AMBIENT WORK STATIONS TEMPERATURE IS...L of the sample fortification solution (Section ýý8) containing 1C 12-2,3,7,8-TCDD at a concentration of 0.5 ng/1,Land C14-2,3,7,8-TCDD at a
1988-10-01
SETTING. .. .. .... .... .... .... .... -1 A. Meteorology .. .. ..... .... .... .... ....... -1 B. Geology .. .. ..... .... .... .... .... ..... -1 C...2a.’~1 quadrangles, San Lcto a fte16hTG uroRcJuan and Carolina, Lcto a fte16hTG uroRcPuerto Rica . Air National Guard, San Juan, Puerto Rico.3 Boca de...precipitation in this area is negative 27.8 inches per year and maximum rainfall intensity is approximately 9 inches. B. Geology Puerto Rico is the
1993-12-01
porphyry intrusives that crop out along the northeast and southeast shores and locally inland. Bedrock lithology is only rarely described in the borehole...kg). Groundwater samples contained arsenic (62.8 mg/L to 66.9 mg/L), chromium (19.2 mg/L to 80 mg/L), copper (52.9 mg/L to 255 mg/L), zinc (163 mg/L...0.17 mg/L; nitrate/nitrite ranging from 0.038 mg/L to 1.41 mg/L; copper at 9.6 pg/I; zinc at 13.3 pg/L; and bis (2-ethylhexyl) phthalate at 1 /ig/L
1991-07-01
Systems Audits ; Preventive Maintenance; Data Assessment Procedures; Corrective Action; Quality Assurance Reports; and Site Management. General Data Quality...for verification and quality control audits . A copy of the QAPP will be in the possession of field sampling teams for all sampling efforts...L cc- acca C wi w-C P-3-- C I- usu 2; - at C4~~2 Q (( c ccc c-c C- 0L U -C 3- au S - - C3 . - acu tr - -a CL.43 C LU -C2 -C ul 0it S w- -C u Ocw - z i
1994-04-01
N F-67 PROJECTt REINO AZR NATIONAL GUARD DATE:03/25/94 ANALYSIS: BNA - CONTANINATZON REPORT REVIEWER: DENNIS MART27...10SS 0.569 0.7021 -23.4 T 12/14/92 2259 CRIoemmA 3 loSS 0.027 1.011 -22.2 T 12/14/92 2259 DIO 1055 l 0.703 .0.11 -22.5 T 12/14/92 2259 NTUL= CULORIDS...seetma. rule VOL DIo -U-T...z..-- 1064 1055 Perocnt D in the Coatcal ezood limits. wa 1064 10ss The ouaes.. does not met 52/102 no contemin. rule NIT
1990-01-01
Migration 5-7 5.2.3 Contaminant Persistence 5-8 5.2.4 Contaminant Mobility and Migration 5-9 5.2.4.1 Contaminant Migration in Surface Water 5-9...of Contaminant 5-11 5.3.2 Potential Routes of Migration 5-11 5.3.3 Contaminant Persistence 5-12 5.3.4 Contaminant Mobility and Migration 5-13 5.3.4.1...Contaminant Mobility and Migration in Soil 5-18 5.6 CONTAMINANT FATE AND TRANSPORT 5-18 AT SITE 10 5.6.1 Summary of Contaminants 5-18 5.6.2 Potential Routes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fulle, D.J.; Bilello, M.A.; Armstrong, J.A.
The US Trade and Development Agency is partially funding the initial phase of an ambient air quality monitoring program for the Metropolitan Municipality of Istanbul in Turkey. The objectives of the monitoring program are fourfold: (1) to ascertain existing levels of air pollution within the urban area; (2) to identify locations where there may be health concerns associated with existing levels of air pollution; (3) to determine the portion of air pollution arising from specific anthropogenic sources within the urban area; and (4) to target the major sources for an emission-reduction program. This program is being carried out in phases.more » A feasibility study has recently been completed. This initial activity will be followed by three main program phases. Phase 1 will involve the installation of several air quality monitoring stations to collect area-wide background data within and surrounding the Municipality. Phase 2 will consist of taking detailed pollutant measurements near specific sources and in specific areas of high pollutant concentrations identified in Phase 1. Phase 3 would target the major sources for emission reductions to improve local air quality and would institute revisions to the existing air quality permitting program. The feasibility study included determining the pollutants of concern, specifying the equipment that should be utilized in Phase 1 for the collection of the data, recommending the number and location of sites where data should be collected, determining site preparation and security needs, and defining the data reduction and analysis techniques which should be employed. This paper describes the results of the feasibility study and outlines plans for the remaining phases of the program.« less
Experimental clean combustor program, phase 2
NASA Technical Reports Server (NTRS)
Gleason, C. C.; Rogers, D. W.; Bahr, D. W.
1976-01-01
The primary objectives of this three-phase program are to develop technology for the design of advanced combustors with significantly lower pollutant emission levels than those of current combustors, and to demonstrate these pollutant emission reductions in CF6-50C engine tests. The purpose of the Phase 2 Program was to further develop the two most promising concepts identified in the Phase 1 Program, the double annular combustor and the radial/axial staged combustor, and to design a combustor and breadboard fuel splitter control for CF6-50 engine demonstration testing in the Phase 3 Program. Noise measurement and alternate fuels addendums to the basic program were conducted to obtain additional experimental data. Twenty-one full annular and fifty-two sector combustor configurations were evaluated. Both combustor types demonstrated the capability for significantly reducing pollutant emission levels. The most promising results were obtained with the double annular combustor. Rig test results corrected to CF-50C engine conditions produced EPA emission parameters for CO, HC, and NOX of 3.4, 0.4, and 4.5 respectively. These levels represent CO, HC, and NOX reductions of 69, 90, and 42 percent respectively from current combustor emission levels. The combustor also met smoke emission level requirements and development engine performance and installation requirements.
Krafft, Cairn C.; Hammerschlag, Richard S.; Guntenspergen, Glenn R.
2009-01-01
The 6-hectare (ha) freshwater tidal Anacostia River Fringe Wetlands (Fringe Wetlands) were reconstructed along the mainstem of the Anacostia River in Washington, DC (Photograph 1, Figure 1) during the summer of 2003. The Fringe Wetlands consist of two separate planting cells. Fringe A, located adjacent to Lower Kingman Island, on the west bank of the Anacostia River, occupies 1.6 ha; Fringe B, located on the east bank of the Anacostia River, occupies 4.4 ha. This project is the third in a series of freshwater tidal wetland reconstructions on the Anacostia River designed and implemented by the US Army Corps of Engineers (USACE) Baltimore District and District Department of the Environment (DDOE) on lands managed by the National Park Service (NPS). The first was Kenilworth Marsh, reconstructed in 1993 (Syphax and Hammerschlag 2005); the second was Kingman Marsh, reconstructed in 2000 (Hammerschlag et al. 2006). Kenilworth and Kingman were both constructed in low-energy backwaters of the Anacostia. However, the Fringe Wetlands, which were constructed on two pre-existing benches along the high-energy mainstem, required sheet piling to provide protection from erosive impacts of increased flow and volume of water associated with storm events during the establishment phase (Photograph 2). All three projects required the placement of dredged sediment materials to increase elevations enough to support emergent vegetation (Photograph 3). The purpose of all three wetland reconstruction projects was to restore pieces of the once extensive tidal freshwater marsh habitat that bordered the Anacostia River historically, prior to the dredge and fill operations and sea wall installation that took place there in the early to mid-1900's (Photograph 4).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Istanbul Water and Sewerage Administration (ISKI) was formed in 1982, and since that time a phased program of sewage collection and treatment has been implemented. Fifteen waste treatment plants, ranging from full scale biological treatment to pre-treatment, are in the design or planning stage, and over 2,000 km of collection lines have been installed. Concurrent with the program is an increasing emphasis on industrial waste treatment, which results in the production of both non-hazardous and hazardous sludges.
2011-07-13
the Munitions Storage Area . Although the tree has since succumb to pine beetles, Affected Environment Environmental Assessment for Construction...from Environmental Health Risks and Safety Risks requires Federal agencies, to the extent permitted by law and mission, to identify and assess ...pose a risk to workers or installation personnel. Industrial hygiene programs address Affected Environment Environmental Assessment for
Ten years of oak restoration in city of Walnut Creek open spaces
Ralph Kraetsch
2002-01-01
The Oak Habitat Restoration Project began in 1991 when several individuals recognized that the oak woodlands and savannas of Walnut Creek's nearly 2,800 acres of open spaces had little natural regeneration. This group gathered volunteers who harvested acorns, planted them, and then installed tree shelters and watered the resulting seedlings. The Project soon...
Restoration planting options for limber pine (Pinus flexilis James) in the Southern Rocky Mountains
A. M. A. Casper; W. R. Jacobi; Anna Schoettle; K. S. Burns
2016-01-01
Limber pine Pinus flexilis James populations in the southern Rocky Mountains are threatened by the combined impacts of mountain pine beetles and white pine blister rust. To develop restoration planting methods, six P. flexilis seedling planting trial sites were installed along a geographic gradient from southern Wyoming to southern Colorado. Experimental...
[Temporary Pacemakers - Step by Step].
Graf, Matthias; Stiller, Patrick; Karch, Martin
2018-06-01
Symptomatic bradycardia is usually caused by abnormalities of atrioventricular conduction or sinus node dysfunction. Reversible and irreversible causes must be considered.Temporary pacemakers are used in the emergency treatment in case of severe bradyarrhythmia.They help to bridge the acute phase until spontaneous restoration of atrioventricular or sinus node function or -if spontaneous restoration fails- until a permanent pacemaker system was implanted.In the following article we discuss the commonly used temporary pacemaker systems. We demonstrate their use and correct programming by an illustrated step by step explanation. For troubleshooting a flow chart was added. © Georg Thieme Verlag KG Stuttgart · New York.
{Interball-1 Plasma, Magnetic Field, and Energetic Particle Observations}
NASA Technical Reports Server (NTRS)
Sibeck, David G.
1998-01-01
Funding from NASA was received in two installments. The first installment supported research using Russian/Czech/Slovak/French Interball-1 plasma, magnetic field, and energetic particles observations in the vicinity of the magnetopause. The second installment provided salary support to review unsolicited proposals to NASA for data recovery and archiving, and also to survey ISTP data provision efforts. Two papers were published under the auspices of the grant. Sibeck et al. reported Interball-1 observations of a wave on the magnetopause with an amplitude in excess of 5 R(sub E), the largest ever reported to date. They attributed the wave to a hot flow anomaly striking the magnetopause and suggested that the hot flow anomaly itself formed during the interaction of an IMF discontinuity with the bow shock. Nemecek et al. used Interball-1's VDP Faraday cup to identify large transient increases in the magnetosheath density. They noted large variations in simultaneous Wind observations of the IMF cone angle, but were unable to establish any relationship between the cone angle variations at Wind and the density variations at Interball-1. Funds from the second installment were used to review over 20 proposals from various researchers in the scientific community who sought NASA support to restore or archive past observations. It also supported a survey of ISTP data provisions which was used as input to a Senior Review of ongoing NASA ISTP programs.
Vroblesky, Don A.; Casey, Clifton C.
2007-01-01
The U.S. Geological Survey, in cooperation with the Naval Facilities Engineering Command Southeast, used newly developed sampling methods to investigate ground-water contamination by chlorobenzenes beneath a drainage ditch on the southwestern side of Installation Restoration Site 4, Naval Air Station Corpus Christi, Corpus Christi, Texas, during 2005-06. The drainage ditch, which is a potential receptor for ground-water contaminants from Installation Restoration Site 4, intermittently discharges water to Corpus Christi Bay. This report uses data from a new type of pore-water sampler developed for this investigation and other methods to examine the subsurface contamination beneath the drainage ditch. Analysis of ground water from the samplers indicated that chlorobenzenes (maximum detected concentration of 160 micrograms per liter) are present in the ground water beneath the ditch. The concentrations of dissolved oxygen in the samples (less than 0.05-0.4 milligram per liter) showed that the ground water beneath and near the ditch is anaerobic, indicating that substantial chlorobenzene biodegradation in the aquifer beneath the ditch is unlikely. Probable alternative mechanisms of chlorobenzene removal in the ground water beneath the drainage ditch include sorption onto the organic-rich sediment and contaminant depletion by cattails through uptake, sorption, and localized soil aeration.
NASA Technical Reports Server (NTRS)
Baer-Riedhart, Jennifer L.; Landy, Robert J.
1987-01-01
The highly integrated digital electronic control (HIDEC) program at NASA Ames Research Center, Dryden Flight Research Facility is a multiphase flight research program to quantify the benefits of promising integrated control systems. McDonnell Aircraft Company is the prime contractor, with United Technologies Pratt and Whitney Aircraft, and Lear Siegler Incorporated as major subcontractors. The NASA F-15A testbed aircraft was modified by the HIDEC program by installing a digital electronic flight control system (DEFCS) and replacing the standard F100 (Arab 3) engines with F100 engine model derivative (EMD) engines equipped with digital electronic engine controls (DEEC), and integrating the DEEC's and DEFCS. The modified aircraft provides the capability for testing many integrated control modes involving the flight controls, engine controls, and inlet controls. This paper focuses on the first two phases of the HIDEC program, which are the digital flight control system/aircraft model identification (DEFCS/AMI) phase and the adaptive engine control system (ADECS) phase.
Restoration of Aspen-Dominated Ecosystem in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2001-01-01
A reserve tree method(RTM)of harvesting was installed in six 70-to75-year-old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
Restoration of aspen-dominated ecosystems in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2000-01-01
A reserve tree method (RTM) of harvesting was installed in six 70-to75-year old aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
Restoration of aspen-dominated ecosystems in the Lake States
Douglas M. Stone; John D. Elioff; Donald V. Potter; Donald B. Peterson; Robert Wagner
2001-01-01
A reserve tree method (RTM) of harvesting was installed in six 70- to 75-yearold aspen-dominated stands to determine if retaining 10 to 15 dominant aspen per acre would decrease sucker density to facilitate restoration of a conifer component. A reserve shelterwood cut was applied to three additional stands to evaluate performance of white pine planted under 50% crown...
2009-06-01
155 SECTION II: PREVENTING RECURRING INVASIVE SPECIES AND RESTORING HISTORICAL PLANT COMMUNITIES ...Wilcove et al. 1998, Westbrook et al. 2005). Beyond degradation to ecological communities , invasive species can threaten human health and cause...recurrence of problem invasive species. This section also gives recommendations for returning management areas to historical native plant communities
US effort on HTS power transformers
NASA Astrophysics Data System (ADS)
Mehta, S.
2011-11-01
Waukesha Electric Systems has been working in HTS power transformers development program under the auspices of US Government Department of Energy since 1994. This presentation will describe various milestones for this program and program history along with the lessons learned along the way. Our motivations for working on this development program based on man benefits offered by HTS power transformers to power delivery systems will be discussed. Based on various issues encountered during execution of many HTS projects, DOE has set up an independent program review process that is lead by team of experts. This team reviews are integral part of all DOE HTS projects. Success of all projects would be greatly enhanced by identifying critical issues early in the program. Requiring appropriate actions to mitigate the issues before processing further will lead to proactive interrogation and incorporation of expert's ideas in the project plans. Working of this review process will be also described in this presentation. Waukesha Electric Systems team including: Superpower-Inc, Oak Ridge National Laboratory, University of Houston Center for Superconductivity and Southern California Edison company was awarded a cost share grant by US Government in 2010 for development of a fault current limiting HTS power transformer. This multi year's program will require design, manufacture, installation, and monitoring of a 28 MVA tree phase transformer installed at Irvine CA. Smart Grid demonstration site. Transformer specifications along with requirements for fault current limiting and site requirement will be discussed. Design and development of various sub systems in support of this program including: HTS conductor performance specification, Dielectric system design approach, Dewar development for containing phase assemblies, cryo-cooling system design approach, etc. will be described. Finally; overall program schedule, critical milestone events, test plans and progress to date will be reported.
NASA Astrophysics Data System (ADS)
Knox, S. H.; Sturtevant, C. S.; Oikawa, P. Y.; Matthes, J. H.; Koteen, L. E.; Anderson, F. E.; Verfaillie, J. G.; Baldocchi, D. D.
2014-12-01
The new generation of open-path, low power, laser spectrometers has allowed us to measure methane (CH4) fluxes continuously in remote regions and answer new and exciting questions on the spatial and temporal variability of greenhouse gas (GHG) fluxes using networks of eddy covariance (EC) towers. Our research is focused in the Sacramento-San Joaquin Delta where we have installed a regional network of flux towers to assess the impacts of land-use change and ecological restoration on CH4 and CO2 fluxes. The Delta was drained for agriculture over a century ago and has since has experienced high rates of subsidence. It is recognized that agriculture on drained peat soils in the Delta is unsustainable in the long-term, and to help reverse subsidence and capture carbon (C) there is an interest in restoring drained land-use types to flooded conditions. However, flooding increases CH4 emissions. We conducted multiple years of simultaneous EC measurements at drained agricultural peatlands (a pasture, a corn field and an alfalfa field) and flooded land-use types (a rice paddy and 3 restored wetlands) to assess the impact of drained to flooded land-use change on CO2 and CH4 fluxes. Since these sites are all within 20 km of each other, they share the same basic meteorology, enabling a direct comparison of differences in the C and GHG budgets between sites. Using a multi-tower approach we found that converting drained agricultural peatlands to flooded land-use types can help reverse soil subsidence and reduce GHG emissions from the Delta. Furthermore, there is a growing interest in wetland restoration in California to generate C credits for both the voluntary C market and the state's cap-and-trade program. However, information on GHG fluxes from restored wetlands is lacking. Using multi-year measurements of GHG fluxes from restored wetlands of varying ages, our research also aims to understand how CO2 and CH4 fluxes from restored wetlands vary during ecosystem development, determine the daily and seasonal forcings controlling these fluxes, and assess management strategies that can help minimize CH4 fluxes and maximize C uptake in restored wetlands. Our multi-year multi-site research program is beginning to answer these questions and bridge understanding between biometeorology, biogeochemistry and climate policy.
Conceptual design of two-phase fluid mechanics and heat transfer facility for spacelab
NASA Technical Reports Server (NTRS)
North, B. F.; Hill, M. E.
1980-01-01
Five specific experiments were analyzed to provide definition of experiments designed to evaluate two phase fluid behavior in low gravity. The conceptual design represents a fluid mechanics and heat transfer facility for a double rack in Spacelab. The five experiments are two phase flow patterns and pressure drop, flow boiling, liquid reorientation, and interface bubble dynamics. Hardware was sized, instrumentation and data recording requirements defined, and the five experiments were installed as an integrated experimental package. Applicable available hardware was selected in the experiment design and total experiment program costs were defined.
Phase III Early Restoration Meeting - Corpus Christi, TX | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open
Clinch River - Environmental Restoration Program (CR-ERP) pilot study, ambient water toxicity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Simbeck, D.J.
1997-06-01
Clinch River - Environmental Restoration Program (CR-ERP) personnel and Tennessee Valley Authority (TVA) personnel conducted a pilot study during the week of April 22-29, 1993, prior to initiation of CR-ERP Phase II Sampling and Analysis activities as described in the Statement of Work (SOW) document. The organisms specified for testing were larval fathead minnows, Pimephales promelas, and the daphnid, Ceriodaphnia dubia. Surface water samples were collected by TVA Field Engineering personnel from Clinch River Mile 9.0 and Poplar Creek Kilometer 1.6 on April 21, 23, and 26. Samples were split and provided to the CR-ERP and TVA toxicology laboratories formore » testing. Exposure of test organisms to these samples resulted in no toxicity (survival, growth, or reproduction) to either species in testing conducted by TVA.« less
Phase III Early Restoration Meeting - Lake Charles, LA | NOAA Gulf Spill
Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News early restoration planning for Phase III and future early restoration plans. Open House: 5:30pm Public
Operational Range Assessment Program (ORAP) Phase II Overview for Active Installations
2011-05-01
Dissolved Metals by EPA 1638M • Isotopic Uranium by EML A-01-R Mod Sediment Analysis • None Benthic Macroinvertebrates • Diversity Indices...Metals by EPA 200.8 • Dissolved Metals by EPA 200.8 (if turbid) • Isotopic Uranium by EML A-01- R Mod (if total U is > action limit) Groundwater
1990-06-01
portions of the master plan and preliminary engineering for a new international airport for Lisbon, Portugal , estimated to cost $250 million. Self... sinES awtuc, SiC,9 @, Sta. 0.4.. Loc.’ el v t tim w . made weet of 66 water to. dril Sl thr0 g concrete.~ oa~~ 4.80 L0051 1.450, a. Di caes"J @tknwe...8217:par-i SI17. lilt)*~ fir, Sai~d. irav nir 1 ,l 111.-li 1s -w-i-l, a 6-Inch lent, Of coals ,- t. tint SANUI. li1tle Silt l(ll) GFIAPNhf SISCCULI/ O REMAR
1990-04-01
j Client’s I.D. I Cont. I Cont. Deec . I Comments • Sample Condition 4,4~ , 4 I I a I * a a I By Tm : ReevdB:- ie By: Tm:RevdB: TieUI M ___ _. _ a...tLa* 0 0 0 0 -T 0 0 N1 f4" V-t %D C9 -t t Cri’,O~~t In! CAlr In- I n-. I - ul 0 0 w 0 w-w V al IL) ., 0-4 0w~ S -4 bO 1 r- -4 u w u GD 0. &, -4 M to 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Feasibility Study (FS) Report has been prepared for the Air National Guard Readiness Center (ANORC) under the U.S. Department of Defense`s (DOD) Installation Restoration Program (IRP). The purpose of this FS is to screen and evaluate potential remediation alternatives for IRP sites and areas of concern (AOC) at the Kellogg Memorial Airport in Battle Creek, Michigan that have previously been identified as having contaminated soil and/or groundwater. This FS has been prepared pursuant to the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the Superfund Amendments and Reauthorization Act (SARA). Montgomery Watson hasmore » been contracted to prepare this FS report under contract DAHA90-94-D-0013, Delivery Order 13.« less
1992-05-26
resources include those contained within the New Jersey Pinelands, such as cranberry bogs and blueberry harvesting. 2.6 Cultural Resources Cultural resources...settlements which were associated with this industry can still be found. Commercial blueberry production was also practiced in the late 1800s and early...aA mm to m m mm to mm -* ,0 00 0 -- a 00 0o 00v 00 00 00 00 00 dL . L. 0. 0.- o .L .L .L. t . L ff oc oo 3 oc ss c s Io C7C7 (( L -(. ma t . m. On 0a
Installation Restoration Program Records Search for Holloman Air Force Base, New Mexico
1983-08-01
U r- ’ u O(N * Q 01 0 0 En 0 OR V r.0N m 0 0 r-C.) Hq 8 40( *0 0 --4 000 qT W m o (nn P4 0U 4) . j 4.4 .00 m * 04 0 00 0 4.) 0 0H *1~ ~ ~4 J4J4...Just southwest of these lagoons, a natural playa occurs which receives discharge from the base as well as seepage from the sewage lagoons. The...inundated portion of the playa is referred to as Lake Holloman. A dam/dike has been constructed across the south one quarter of the playa creating Lake
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-17
... Damage Assessment, Remediation, and Restoration Program for Fiscal Year 2011 AGENCY: National Oceanic and..., Remediation, and Restoration Program for Fiscal Year 2011. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration Program (DARRP) is announcing new...
Ray W. Brown; Michael C. Amacher; Walter F. Mueggler; Janice Kotuby-Amacher
2003-01-01
Methods for restoring native plant communities on acidic mine spoils at high elevations were evaluated in a "demonstration area" in the New World Mining District of southern Montana. Research plots installed in 1976 were assessed for 22 years and compared with adjacent native reference plant communities. A 1.5-acre (0.61-ha) area of mine spoils was shaped and...
NASA presentation. [wind energy conversion systems planning
NASA Technical Reports Server (NTRS)
Thomas, R. L.
1973-01-01
The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.
Reference earth orbital research and applications investigations (blue book). Volume 1: Summary
NASA Technical Reports Server (NTRS)
1971-01-01
The criteria, guidelines, and an organized approach for use in the space station and space shuttle program definition phase are presented. Subjects discussed are: (1) background information and evolution of the studies, (2) definition of terms used, (3) concepts of the space shuttle, space station, experiment modules, shuttle-sortie operations and modular space station, and (4) summary of functional program element (FPE) requirements. Diagrams of the various configurations and the experimental equipment to be installed in the structures are included.
Oak restoration trials: Santa Catalina Island
Lisa Stratton
2002-01-01
Two restoration trials involving four oak species have been implemented as part of a larger restoration program for Catalina Island. In 1997 the Catalina Island Conservancy began an active program of restoration after 50 years of ranching and farming activities on the island. The restoration program includes removing feral goats and pigs island-wide and converting 80...
Bearing Restoration by Grinding
1976-05-21
lIng of bearings prior to installation, installing a contaminated bearing, manufacturing defects, ring growth in service, and corrosion. Nonmetallic...operation of rolling-elemsnt bearings is growth of the bearing race rings. As an example, the inner or outer races, can grow due to metallurgical...transformations or due to hoop stresses during operation This growth results in the bearing being not reusable after removal from its application. For aircraft
Application-Program-Installer Builder
NASA Technical Reports Server (NTRS)
Wolgast, Paul; Demore, Martha; Lowik, Paul
2007-01-01
A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.
32 CFR 202.13 - Technical assistance for public participation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRC may request technical assistance for interpreting scientific and engineering issues with regard to the nature of environmental hazards at the installation and environmental restoration activities...
Promotion of renewable energy in some MENA region countries
NASA Astrophysics Data System (ADS)
Abdeladim, K.; Bouchakour, S.; Arab, A. Hadj; Ould Amrouche, S.; Yassaa, N.
2018-05-01
In recent years Middle East and North African (MENA) countries, are showing efforts about the integration of renewable electricity into their power markets. Indeed, installations were already achieved and renewable energy programs were launched. The Algerian program remains one of the most ambitious with its installation capacity up to 22GW of power generating to be installed by 2030. More than 60 % of the total capacity is planned to be solar photovoltaic (PV). Like Algeria, Morocco has integrated development project with a target to develop by 2020 a 2000 MW capacity of electricity production from solar energy. The Tunisian government has launched its first phase of the renewable power generation program, with an objective to install 1,000 MW of renewable power capacity over the 2017-2020 periods, where 650 MW of the total capacity is planned to be solar and 350 MW wind. One of the leading Arab country in wind energy, these recent years is Egypt, with its more than 700 megawatt of operational power generation plants and has launched significant projects development in solar energy. Regarding Jordan, the government has taken different steps in this field of energy with a Strategy plan 2007-2020, by implementing a large scale of projects on renewable energy sources, with an objective to cover 10% of the country’s energy supply, from renewable sources by the year 2020. Concerning Lebanon, the country is looking to attain an integration of 12 % by 2020.
NASA Astrophysics Data System (ADS)
Vivas Veloso, J. A.; Christie, D. R.; Hoffmann, T. L.; Campus, P.; Bell, M.; Langlois, A.; Martysevich, P.; Demirovik, E.; Carvalho, J.; Kramer, A.; Wu, Sean F.
2002-11-01
The provisional operation and maintenance of IMS infrasound stations after installation and subsequent certification has the objective to prepare the infrasound network for entry into force of the Comprehensive Nuclear-Test-Ban Treaty (CTBT). The goal is to maintain and fine tune the technical capabilities of the network, to repair faulty equipment, and to ensure that stations continue to meet the minimum specifications through evaluation of data quality and station recalibration. Due to the globally dispersed nature of the network, this program constitutes a significant undertaking that requires careful consideration of possible logistic approaches and their financial implications. Currently, 11 of the 60 IMS infrasound stations are transmitting data in the post-installation Testing & Evaluation mode. Another 5 stations are under provisional operation and are maintained in post-certification mode. It is expected that 20% of the infrasound network will be certified by the end of 2002. This presentation will focus on the different phases of post-installation activities of the IMS infrasound program and the logistical challenges to be tackled to ensure a cost-efficient management of the network. Specific topics will include Testing & Evaluation and Certification of Infrasound Stations, as well as Configuration Management and Network Sustainment.
Phase 1 Development Report for the SESSA Toolkit
2014-09-01
data acquisition, data management, and data analysis. SESSA was designed to meet forensic crime scene needs as defined by the DoD’s Military Criminal...on the design , functional attributes, algorithm development, system architecture, and software programming include: Robert Knowlton, Brad Melton...Building Restoration Operations Optimization Model (BROOM). BROOM (Knowlton et al., 2012) was designed for consequence management activities (e.g
The SPACEHAB payload is installed in the PCR at LC 39A awaiting further STS-89 processing
NASA Technical Reports Server (NTRS)
1997-01-01
The SPACEHAB payload arrived at Launch Pad 39A this morning and was installed in the Payload Changeout Room. Final preparations for liftoff of the STS-89 mission are under way. Endeavour and its crew of seven are targeted for a Jan. 22 launch. STS-89 will be the eighth Shuttle docking with the Russian Space Station Mir as part of Phase 1 of the International Space Station program. Mission Specialist Andy Thomas, Ph.D., will succeed Mission Specialist David Wolf, M.D., as the last NASA astronaut scheduled for a long-duration stay aboard Mir.
NASA Astrophysics Data System (ADS)
Maguire, J. F.; Yuan, J.
2009-10-01
This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, P.A.; Anderson, K.D.
2007-07-01
This paper describes the challenges behind the implementation of the characterization, remediation, and the Site Closure for three 91b Radioactive Wastes under a Performance Based Contract at Lackland Air Force Base, San Antonio, Texas. The Defense Environmental Restoration Program (DERP) was established by Section 211 of the Superfund Amendments and Reauthorization Act of 1986 (SARA). A part of the DERP provides for the cleanup of hazardous substances associated with past Department of Defense (DoD) activities and is consistent with the provisions of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA). It is the Air Force Installation Restoration Program (IRP)more » that has responsibility for the cleanup activities associated with CERCLA. Under contract to the Air Force Center for Environmental Excellence (AFCEE), the ECC Project Team, that included ECC, Cabrera Services, and Malcolm Pirnie, was responsible for the implementation of the actions at three sites. The three IRP (91b) sites included RW015, a 0.02 square kilometer (5.5 acre) site, RW017 a 0.003 square kilometer (0.9 acre) site, and RW033 an 0.356 square kilometer (88 acre) site. Adding to the complexities of the project were issues of archaeological areas of interest, jurisdictional wetlands, land open to hunting, issues of security as well as compliance to the myriad of air force base rules, regulations, and Air Force Instructions (AFI). The award of the project task order was July of 2005, the project plan phase started in July of 2005 followed by the remedy implementation that included characterization and remediation as required reached completion in June of 2006. The project closure including the development and approval final status survey reports, proposed plans, and decision documents that parallel the CERCLA process was initiated in June of 2006 and is expected to reach completion in August of 2007. This paper will focus on the issues of working to achieve radiological and chemical closure under a performance based contract vehicle and the challenges encountered while reaching this goal. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
Upper East Fork Poplar Creek Operable Unit 2 consists of the Abandoned Nitric Acid pipeline (ANAP). This pipeline was installed in 1951 to transport liquid wastes {approximately}4800 ft from Buildings 9212, 9215, and 9206 to the S-3 Ponds. Materials known to have been discharged through the pipeline include nitric acid, depleted and enriched uranium, various metal nitrates, salts, and lead skimmings. During the mid-1980s, sections of the pipeline were removed during various construction projects. A total of 19 locations were chosen to be investigated along the pipeline for the first phase of this Remedial Investigation. Sampling consisted of drilling downmore » to obtain a soil sample at a depth immediately below the pipeline. Additional samples were obtained deeper in the subsurface depending upon the depth of the pipeline, the depth of the water table, and the point of auger refusal. The 19 samples collected below the pipeline were analyzed by the Oak Ridge Y-12 Plant`s laboratory for metals, nitrate/nitrite, and isotopic uranium. Samples collected from three boreholes were also analyzed for volatile organic compounds because these samples produced a response with organic vapor monitoring equipment. Uranium activities in the soil samples ranged from 0.53 to 13.0 pCi/g for {sup 238}U, from 0.075 to 0.75 pCi/g for {sup 235}U, and from 0.71 to 5.0 pCi/g for {sup 238}U. Maximum total values for lead, chromium, and nickel were 75.1 mg/kg, 56.3 mg/kg, and 53.0 mg/kg, respectively. The maximum nitrate/nitrite value detected was 32.0 mg-N/kg. One sample obtained adjacent to a sewer line contained various organic compounds, at least some of which were tentatively identified as fragrance chemicals commonly associated with soaps and cleaning solutions. The results of the baseline human health risk assessment for the ANAP contaminants of potential concern show no unacceptable risks to human health.« less
Martens, Kyle D.; Fish, Teresa M.; Watson, Grace A.; Connolly, Patrick J.
2014-01-01
Salmon and steelhead populations have been severely depleted in the Columbia River from factors such as the presence of tributary dams, unscreened irrigation diversions, and habitat degradation from logging, mining, grazing, and others (Raymond, 1988). The U.S. Geological Survey (USGS) has been funded by the Bureau of Reclamation (Reclamation) to provide evaluation of on-going Reclamation funded efforts to recover Endangered Species Act (ESA) listed anadromous salmonid populations in the Methow River watershed, a watershed of the Columbia River in the Upper Columbia River Basin, in north-central Washington State (fig. 1). This monitoring and evaluation program was funded to document Reclamation’s effort to partially fulfill the 2008 Federal Columbia River Power System Biological Opinion (BiOp) (National Oceanographic and Atmospheric Administration, Fisheries Division 2003). This Biological Opinion includes Reasonable and Prudent Alternatives (RPA) to protect listed salmon and steelhead across their life cycle. Species of concern in the Methow River include Upper Columbia River (UCR) spring Chinook salmon (Oncorhynchus tshawytscha), UCR summer steelhead (O. mykiss), and bull trout (Salvelinus confluentus), which are all listed as threatened or endangered under the ESA. The work done by the USGS since 2004 has encompassed three phases of work. The first phase started in 2004 and continued through 2012. This first phase involved the evaluation of stream colonization and fish production in Beaver Creek following the modification of several water diversions (2000–2006) that were acting as barriers to upstream fish movement. Products to date from this work include: Ruttenburg (2007), Connolly and others (2008), Martens and Connolly (2008), Connolly (2010), Connolly and others (2010), Martens and Connolly (2010), Benjamin and others (2012), Romine and others (2013a), Weigel and others (2013a, 2013b, 2013c), and Martens and others (2014). The second phase, initiated in 2008, focuses on the evaluation of the M2 reach (rkm 66– 80) of the mainstem Methow River prior to restoration actions planned by Reclamation and Yakama Nation. The M2 study was designed to help understand the inter-relationships between stream habitat and the life history of various fish species to explain potential success or limitations in response to restoration actions. To help document changes derived by restoration, two reference reaches (Upper Methow between rkm 85 and 90, and Chewuch River between rkm 4 and 11) were identified based on relative lack of disturbance, proximity to the restoration reach, and relative unconfined geomorphology. A control reach (Lower Methow between rkm 57 and 64, also referred to as “Silver Reach”) was 2 identified based on its similar disturbance as the reference reach, proximity to the restoration reach, and relatively unconfined geomorphology. Products to date include Barber and others (2011), Bellmore (2011), Tibbits and others (2012), Bellmore and others (2013), Benjamin and others (2013), Romine and others (2013b), Bellmore and other (2014), Martens and others (2014), and Martens and Connolly (2014). The third phase of work has been to help with the development and to provide data for modeling efforts. Most of the planned M2 reach restoration is focused on the creation or improvement of offchannel habitat, especially side channels. The pre-restoration portion of this study has been documented by Martens and Connolly (2014). Side channel restoration actions were initiated in 2012 (Whitefish Island side channel, also referred to as SC3; rkm 76) and are planned to continue over the next several years. The Whitefish Island side channel was modified to maintain hydrological connection with the mainstem throughout the year. In addition, several log structures were installed and pools were deepened to create fish habitat. Prior to restoration, this side channel would lose hydrological connection with the mainstem Methow River, leaving one large pool near the bottom of the side channel and several shallow isolated pools that may or may not go dry. In seasonally connected side channels, juvenile salmonid survival in pools less than 100 cm average depth was lower than in pools greater than 100 cm average depth (Martens and Connolly, 2014). In this report, we document our field work and analysis completed in 2013. During 2013, USGS sampling efforts were focused on resampling of three reaches in Beaver Creek, testing methodology in the Whitefish Island side channel, conducting hatchery survival estimates, and operating a screw trap on the Chewuch River (funded by Yakama Nation; fig. 1). The Beaver Creek sampling effort was a revisit of three index sites sampled continuously from 2004 to 2007 to look at the fish response to barrier removal. Methodology testing in Whitefish Island side channel was done to determine the best method for evaluating fish populations after restoration efforts in side channels (previous sampling methods were determined to be ineffective after pools were deepened). Hatchery survival estimates were completed to monitor fish survival in the Methow and Columbia Rivers, while the screw trap was operated to estimate migrating fish populations in the Chewuch River and track passive integrated transponder (PIT)-tagged fish. In addition, we maintained a network of PIT-tag interrogation systems (PTIS), assisted Reclamation with fish removal events associated with stream restoration (two people for 9 days; 14 percent of summer field season), and conducted a stream metabolism study designed to help parameterize and calibrate the stream productivity model (Bellmore and others, 2014) with model validation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, Bruce
Cloud County Community College's (CCCC) Wind Energy Technology (WET) program is a leader in the renewable energy movement across Kansas and the USA. The field of renewable energy is a growing industry which continues to experience high demand for career opportunities. This CCCC/DOE project entailed two phases: 1) the installation of two Northwind 100 wind turbines, and 2) the continued development of the WET program curriculum, including enhancement of the CCCC Blade Repair Certificate program. This report provides a technical account of the total work performed, and is a comprehensive description of the results achieved.
NASA Astrophysics Data System (ADS)
Toda, Sogo; Kato, Yuji; Kudo, Nobuki; Shimizu, Koichi
2017-04-01
For transillumination imaging of an animal body, we have attempted to suppress the scattering effect in a turbid medium. It is possible to restore the optical image before scattering using phase-conjugate light. We examined the effect of intensity information as well as the phase information for the restoration of the original light distribution. In an experimental analysis using animal tissue, the contributions of the phase- and the intensity-information to the image restoration through turbid medium were demonstrated.
Winner, M.D.
1993-01-01
For more than 80 years, the Federal-State Cooperative Program in North Carolina has been an effective partnership that provides timely water information for all levels of government. The cooperative program has raised awareness of State and local water problems and issues and has enhanced transfer and exchange of scientific information. The U.S. Geological Survey (USGS) conducts statewide water-resources investigations in North Carolina that include hydrologic data collection, applied research studies, and other interpretive studies. These programs are funded through cooperative agreements with the North Carolina Departments of Environment, Health, and Natural Resources; Human Resources; and Transportation, as well as more than a dozen city and county governmental agencies. The USGS also conducts special studies and data-collection programs for Federal agencies, including the Department of Defense, the U.S. Soil Conservation Service, the Tennessee Valley Authority, and the U.S. Environmental Protection Agency that contribute to North Carolina's water information data base. Highlights of selected programs are presented to show the scope of USGS activities in North Carolina and their usefulness in addressing water-resource problems. The reviewed programs include the statewide data-collection program, estuarine studies, the National Water-Quality Assessment program, military installation restoration program, and groundwater flow model-development program in the Coastal Plain and Piedmont provinces.
Capability to Recover Plutonium-238 in H-Canyon/HB-Line - 13248
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fuller, Kenneth S. Jr.; Smith, Robert H. Jr.; Goergen, Charles R.
2013-07-01
Plutonium-238 is used in Radioisotope Thermoelectric Generators (RTGs) to generate electrical power and in Radioisotope Heater Units (RHUs) to produce heat for electronics and environmental control for deep space missions. The domestic supply of Pu-238 consists of scrap material from previous mission production or material purchased from Russia. Currently, the United States has no significant production scale operational capability to produce and separate new Pu-238 from irradiated neptunium-237 targets. The Department of Energy - Nuclear Energy is currently evaluating and developing plans to reconstitute the United States capability to produce Pu-238 from irradiated Np-237 targets. The Savannah River Site hadmore » previously produced and/or processed all the Pu-238 utilized in Radioisotope Thermoelectric Generators (RTGs) for deep space missions up to and including the majority of the plutonium for the Cassini Mission. The previous full production cycle capabilities included: Np- 237 target fabrication, target irradiation, target dissolution and Np-237 and Pu-238 separation and purification, conversion of Np-237 and Pu-238 to oxide, scrap recovery, and Pu-238 encapsulation. The capability and equipment still exist and could be revitalized or put back into service to recover and purify Pu-238/Np-237 or broken General Purpose Heat Source (GPHS) pellets utilizing existing process equipment in HB-Line Scrap Recovery, and H-Canyon Frame Waste Recovery processes. The conversion of Np-237 and Pu-238 to oxide can be performed in the existing HB-Line Phase-2 and Phase- 3 Processes. Dissolution of irradiated Np-237 target material, and separation and purification of Np-237 and Pu-238 product streams would be possible at production rates of ∼2 kg/month of Pu-238 if the existing H-Canyon Frames Process spare equipment were re-installed. Previously, the primary H-Canyon Frames equipment was removed to be replaced: however, the replacement project was stopped. The spare equipment is stored and still available for installation. Out of specification Pu-238 scrap material can be purified and recovered by utilizing the HB-Line Phase- 1 Scrap Recovery Line and the Phase-3 Pu-238 Oxide Conversion Line along with H-Canyon Frame Waste Recovery process. In addition, it also covers and describes utilizing the Phase-2 Np-237 Oxide Conversion Line, in conjunction with the H-Canyon Frames Process to restore the H-Canyon capability to process and recover Np-237 and Pu-238 from irradiated Np-237 targets and address potential synergies with other programs like recovery of Pu-244 and heavy isotopes of curium from other target material. (authors)« less
INSTALLATION AT FRANKFURT OF A RECEIVING STATION FOR THE TRANSIT PROGRAM, PHASE I
ata. The 2 receivers cover the range between 53 and 262 mc that includes satelite frequencies of 54, 108, 162 and 216 mc, except 324 mc. It wil be...E 390 envisaged for the reception of standard frequencies and time signals, satelites can be observed at a frequency of 20 mc (using a sepaate local
ERIC Educational Resources Information Center
Utah System Approach to Individualized Learning Project.
The U-SAIL system is a practical approach to individualization of instruction in which a problem-solving process is employed to install a program in logical sequential phases. U-SAIL is a nationally validated, successfully replicated, cost-feasible system for individualization of instruction which can be implemented in a variety of settings with…
78 FR 77098 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-20
...: Regular submission (extension of a current information collection). Number of Respondents: 1,800. Average... Trustees in more efficiently carrying out the restoration planning phase of Natural Resource Damage... requiring restoration, during the restoration planning phase of the NRDA process. Affected Public: Not-for...
Application of Long Distance Conveyance (LDC) of Dredged Sediments to Louisiana Coastal Restoration
2011-01-01
U.S. Army Engineer District, New Orleans, Laura Beldon, Louisiana Office of Coastal Protection and Restoration, Cheryl Brodnax, National...Louisiana Department of Natural Resources, Christopher Knotts , Louisiana Department of Natural Resources, Fay Lachney, MVN, Luke LeBas, Louisiana...associated with the petrochemical industry (e.g., Van Dyke et al. 1994) or backfilled canals dredged as part of the pipeline installation (e.g., Knott et al
The mobile Sousy-Doppler radar: Technical design and first results
NASA Technical Reports Server (NTRS)
Czechowsky, P.; Schmidt, G.; Ruster, R.
1983-01-01
A mobile VHF Doppler system was developed. The electronic part is installed in a 20 ft container and tested using a special log periodic aerial to illuminate the 300 m dish. The system was extended by designing a mobile phased antenna array with finally 576 Yagi elements. The grouping of the single Yagis, the system of transmission lines, the phase shifters, the power splitters and the T/R switch are described. Results from the first two campaigns and a survey of future programs demonstrating the flexibility of this mobile system are summarized.
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010 AGENCY: National... Damage Assessment, Remediation, and Restoration Program for Fiscal Years 2009 and 2010. SUMMARY: The National Oceanic and Atmospheric Administration's (NOAA's) Damage Assessment, Remediation, and Restoration...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.120 What...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.123 - How may an agency use program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program...
50 CFR 80.120 - What is program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.120 What...
Calibration Method to Eliminate Zeroth Order Effect in Lateral Shearing Interferometry
NASA Astrophysics Data System (ADS)
Fang, Chao; Xiang, Yang; Qi, Keqi; Chen, Dawei
2018-04-01
In this paper, a calibration method is proposed which eliminates the zeroth order effect in lateral shearing interferometry. An analytical expression of the calibration error function is deduced, and the relationship between the phase-restoration error and calibration error is established. The analytical results show that the phase-restoration error introduced by the calibration error is proportional to the phase shifting error and zeroth order effect. The calibration method is verified using simulations and experiments. The simulation results show that the phase-restoration error is approximately proportional to the phase shift error and zeroth order effect, when the phase shifting error is less than 2° and the zeroth order effect is less than 0.2. The experimental result shows that compared with the conventional method with 9-frame interferograms, the calibration method with 5-frame interferograms achieves nearly the same restoration accuracy.
Stream and floodplain restoration in a riparian ecosystem disturbed by placer mining
Karle, Kenneth F.; Densmore, Roseann V.
1994-01-01
Techniques for the hydrologic restoration of placer-mined streams and floodplains were developed in Denali National Park and Preserve Alaska, USA. The hydrologic study focused on a design of stream and floodplain geometry using hydraulic capacity and shear stress equations. Slope and sinuosity values were based on regional relationships. Design requirements include a channel capacity for a 1.5-year (bankfull) discharge and a floodplain capacity for a 1.5- to 100-year discharge. Concern for potential damage to the project from annual flooding before natural revegetation occurs led to development of alder (Alnus crispa) brush bars to dissipate floodwater energy and encourage sediment deposition. The brush bars, constructed of alder bundles tied together and anchored laterally adjacent to the channel, were installed on the floodplain in several configurations to test their effectiveness. A moderate flood near the end of the two-year construction phase of the project provided data on channel design, stability, floodplain erosion, and brush bar effectiveness. The brush bars provided substantial protection, but unconsolidated bank material and a lack of bed armour for a new channel segment led to some bank erosion, slope changes and an increase in sinuosity in several reaches of the study area.
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2014 CFR
2014-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2013 CFR
2013-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE AND SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80...
The STAR Detector Upgrades and Electromagnetic Probes in Beam Energy Scan Phase II
NASA Astrophysics Data System (ADS)
Yang, Chi
The Beam Energy Scan Phase II at RHIC, BES-II, is scheduled from year 2019 to 2020 and will explore the high baryon density region of the QCD phase diagram with high precision. The program will focus on the interesting energy region determined from the results of BES-I. Some of the key measurements anticipated are the chiral symmetry restoration and QGP thermal radiation in the dilepton and direct photon channels. The measurements will be possible with an order of magnitude better statistics provided by the electron cooling upgrade of RHIC and with the detector upgrades planned to extend STAR experimental reach. The upgrades are: the inner Time Projection Chamber sectors (iTPC), the Event Plane Detector (EPD), and the end-cap Time of Flight (eTOF). We present the BES-II program details and the physics opportunities in the dilepton and direct photon channels enabled by the upgrades.
Responses to riparian restoration in the Spring Creek watershed, Central Pennsylvania
Carline, R.F.; Walsh, M.C.
2007-01-01
Riparian treatments, consisting of 3- to 4-m buffer strips, stream bank stabilization, and rock-lined stream crossings, were installed in two streams with livestock grazing to reduce sediment loading and stream bank erosion. Cedar Run and Slab Cabin Run, the treatment streams, and Spring Creek, an adjacent reference stream without riparian grazing, were monitored prior to (1991-1992) and 3-5 years after (2001-2003) riparian buffer installation to assess channel morphology, stream substrate composition, suspended sediments, and macroinvertebrate communities. Few changes were found in channel widths and depths, but channel-structuring flow events were rare in the drought period after restoration. Stream bank vegetation increased from 50% or less to 100% in nearly all formerly grazed riparian buffers. The proportion of fine sediments in stream substrates decreased in Cedar Run but not in Slab Cabin Run. After riparian treatments, suspended sediments during base flow and storm flow decreased 47-87% in both streams. Macroinvertebrate diversity did not improve after restoration in either treated stream. Relative to Spring Creek, macroinvertebrate densities increased in both treated streams by the end of the posttreatment sampling period. Despite drought conditions that may have altered physical and biological effects of riparian treatments, goals of the riparian restoration to minimize erosion and sedimentation were met. A relatively narrow grass buffer along 2.4 km of each stream was effective in improving water quality, stream substrates, and some biological metrics. ?? 2007 Society for Ecological Restoration International.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-29
... DEPARTMENT OF COMMERCE Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration.... ACTION: Notice of Indirect Cost Rates for the Damage Assessment, Remediation, and Restoration Program for... Assessment, Remediation, and Restoration Program (DARRP) is announcing new indirect cost rates on the...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2012 CFR
2012-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.121 May...
50 CFR 80.121 - May an agency earn program income?
Code of Federal Regulations, 2011 CFR
2011-10-01
... (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM ADMINISTRATIVE REQUIREMENTS, PITTMAN-ROBERTSON WILDLIFE RESTORATION AND DINGELL-JOHNSON SPORT FISH RESTORATION ACTS Program Income § 80.121 May...
Pilot installation of a bridge scour monitoring site at FM 1157 Mustang Creek
DOT National Transportation Integrated Search
1999-12-01
A pilot installation was implemented at the Mustang Creek bridge crossing on FM 1157 in the Yoakum District, Jackson County, Texas. This pilot installation was developed in two phases. Phase 1 used a rather limited datalogger that lacked the ability ...
A cost analysis of a smoke alarm installation and fire safety education program.
Parmer, John E; Corso, Phaedra S; Ballesteros, Michael F
2006-01-01
While smoke alarm installation programs can help prevent residential fire injuries, the costs of running these programs are not well understood. We conducted a retrospective cost analysis of a smoke alarm installation program in 12 funded communities across four states. Costs included financial and economic resources needed for training, canvassing, installing, and following-up, within four cost categories: (a) personnel, (b) transportation, (c) facility, and (d) supplies. Local cost per completed home visit averaged 214.54 dollars, with an average local cost per alarm installed of 115.02 dollars. Combined state and local cost per alarm installed across all four states averaged 132.15 dollars. For every 1% increase in alarm installation, costs per alarm decrease by 1.32 dollars. As more smoke alarms are installed, the average installation cost per alarm decreases. By demonstrating effective economies of scale, this study suggests that smoke alarm programs can be implemented efficiently and receive positive economic returns on investment.
Immediate provisional restoration of a single-tooth implant in the esthetic zone: a case report.
Fu, Po-Sung; Wu, Yi-Min; Tsai, Ching-Fang; Huang, Ta-Ko; Chen, Wen-Cheng; Hung, Chun-Cheng
2011-02-01
Immediate implant restoration of single implants may demonstrate a positive effect on peri-implant soft tissue. Placement of a provisional restoration following implant surgery can create soft tissue contours that resemble normal gingival topography before placement of the definitive prosthesis. This article describes a staged approach of the mandibular permanent right central incisor, which was congenital missing. The proper space for restoration of the missing incisor was created through orthodontic treatment. The scheduled implant site was reconstructed using autogenous bone harvested from the chin region. After a healing period of four months, an implant was installed with the connection of a fixed provisional crown to a prefabricated temporary abutment. The soft tissue around the implant healed according to the contours of the provisional restoration and the emergence profile was used to duplicate the definitive restoration. Peri-implant esthetics was achieved through the staged approach and immediate restoration of the implant. Copyright © 2011. Published by Elsevier B.V.
1993-11-01
RECOMMENDATIONS SECTION 7 REFERENCES APPENDIX A MONITORING WELL CONSTRUCTION RECORDS AND BORING LOGS APPENDIX B SOIL BORING LOGS 3 APPENDIX C ...0.25 .o000 2- C *LUOEITNYL VINYL ETNEE NA i2/o/U NP 0. 131.0ICNLORMTNMIE NA 12/OS/IS 0.35 0.0S 1.000 DIOCULUSUGRTNAN NA 12/OS/US a 0.45 1.000 ¶ ,2...12l/Sm a 10.001011 kS kfue(K)I m ot~b 12/09/ 12/fl/U a 10.00 1.005 ugejpvu 12/09/ tZ/3U 0 10.0 1 .M E, I c . ce 4Z- CR0ESFENGINEERING SCIENCE 135-073
1993-09-01
840IR21400 II noMoaU "IfafO "WdwotvW&Q qWG1Mo O4ýSW w"W V~lvw)p-0 Wft%&,W111’W"AOMMC A W-o w s -ucm 1 . Agenc Use Q*~ ILena SLaMI 2. Ropers 08O 3. Repsis...Air Nationai Guara Readiness Center Andrews Air Force Base. Marviand :0331 11. SuppiementM Note, 1 . 0is~ntrbgnAwrAisababi~y Statemwa 12b. Diitribdise...IINMO O pp Wicno A1,- 1bin 1 Uf4 6.~ k~/s Primc ooe 1V. Secuiicy ClassdmcEion of ¶3.T SMaau Ctassmicaton of 19. SecsuriyOsfs of 20 ISMeAbto
1995-04-01
kg 1/26/94 8260I Methylenec chloride ɘ.012 0.012 m~y/kiy 1/26/94 8260 Meihyliuethacrylate ɘ.012 0.012 mg/kg 1/26/94 8260 4- Methyl -2-peritanone (MIBK...0.012 0.012 mgo/kg 1/23/94 8260 Methylmicthiacrylate < 0.012 0.012 mgL,/kg2 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0. 029 0.029 mg/kg 1/23/94 8260...8260EMethylene chloride ɘ.01 1 0.011 mgý/k~g 1/23/94 8260 Methyltnethiacrylate ɘ.011 0.011 mng/kg 1/23/94 8260 4- Methyl -2-pcntanone (MIBK) < 0.028
NASA Astrophysics Data System (ADS)
Snitgen, J. L.; Moren, M. M.
2005-05-01
During rainfall and snow melt events, a first order, cold-water stream was receiving varying amounts of liquefied manure from a concentrated feed lot. Stream restoration efforts included the implementation of best management practices to prevent further discharge of the water/manure mixture to the stream. Physical, chemical and biological data were collected pre-construction and two years post-construction of the containment system at a fixed location downstream of the feedlot. Hilsenhoff Biotic Index scores improved significantly, from 6.79 or "Fairly Poor" before the installation of the manure containment system, to 5.28 or "Good" after the installation of the manure containment system. Taxa richness improved from 25 to 34 and the EPT score improved from 0 to 4. Key words: macroinvertebrate, community response, manure, feedlot runoff, stream restoration
[COMPLICATIONS OF STENTINGOF UPPER URINARY TRACT].
Shkodkin, S V; Kogan, M I; Lyubushkin, A V; Miroshnichenko, O V
2015-01-01
Restoring the passage of urine through the upper urinary tract routinely is achieved by installing of external or internal drainage. Due to its objective advantages, internal drainage has been successfully used in surgery of the upper urinary tract. This review outlines the problems associated with the use ofinternal stents, namely difficultyin installation, migration, and reflux and stent obstruction, bacterial colonization of the stent, the development of functional and morphological changes in the drained segment of urinary tract.
1986-02-27
This photograph shows a modified General Dynamics AFTI/F-111A Aardvark in flight with supercritical mission adaptive wings (MAW) installed. With the phasing out of the TACT program came a renewed effort by the Air Force Flight Dynamics Laboratory to extend supercritical wing technology to a higher level of performance. In the early 1980s the supercritical wing on the F-111A aircraft was replaced with a wing built by Boeing Aircraft Company System called a “mission adaptive wing” (MAW), and a joint NASA and Air Force program called Advanced Fighter Technology Integration (AFTI) was born.
NASA Astrophysics Data System (ADS)
Borriello, G.; Bonori, V.; Cresti, M.; Dente, E.; Ideo, L.; Mazzi, G.; Usai, A.; Tafuto, A.; Togna, F.
2014-10-01
In this paper authors provide a description of the currently deployed Man Portable Air Defense System (ManPADS) heat-seeking missiles. Principles of IR seeking and Aircraft signatures are shortly described. Basic information are listed on currently designed Infra-Red Counter Measure Systems, intended to protect Aircrafts against ManPADS. Authors provide an overview on ELT-572(v)2 DIRCM Program, funded by Italian Air Force, currently in low rate production phase. Description of the Design and Development phase, completed in Elettronica SpA in 2013, is reported. Development Test and Evaluation (DTE) Activities on ELT-572(v)2 DIRCM, jointly performed by Elettronica Spa and Italian Air Force Flight Test Centre, are shortly described. A summary of tests and some results are also discussed. Platform Installation Programs, using the low rate production units from ELT-572(v)2 DIRCM Program, are finally listed.
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Restoration selection-developing... POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.55 Restoration selection—developing restoration plans. (a) General. OPA requires that damages be based upon a...
15 CFR 990.55 - Restoration selection-developing restoration plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Restoration selection-developing... POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.55 Restoration selection—developing restoration plans. (a) General. OPA requires that damages be based upon a...
15 CFR 990.53 - Restoration selection-developing restoration alternatives.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Restoration selection-developing... OIL POLLUTION ACT REGULATIONS NATURAL RESOURCE DAMAGE ASSESSMENTS Restoration Planning Phase § 990.53 Restoration selection—developing restoration alternatives. (a) General. (1) If the information on injury...