Sample records for installations maintenance control

  1. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  2. 40 CFR 450.21 - Effluent limitations reflecting the best practicable technology currently available (BPT).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Design, install and maintain effective erosion controls and sediment controls to minimize the discharge of pollutants. At a minimum, such controls must be designed, installed and maintained to: (1) Control... design, installation and maintenance of erosion and sediment controls must address factors such as the...

  3. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...

  4. Understanding the needs of hand control users, driver rehabilitation specialists, and dealers/installers.

    PubMed

    Lowe, Evan; Drouin, Nathalie; Venhovens, Paul J; Brooks, Johnell O

    2014-10-01

    Understanding unique perspectives from key stakeholder groups involved in the hand control (HC) industry, including driver rehabilitation specialists (DRSs) who train users how to use their HCs, dealers/installers, and users, may become increasingly important in the United States due to increases in elderly, diabetic, and wounded warrior amputee driving populations. In this exploratory study, phone interviews were conducted with 20 DRSs, 20 dealers/installers, and 20 users regarding their perspectives about HC training, maintenance and operation, and design improvements. Results revealed common views and differences in perspectives about whether HC users should receive training and for how long, when and how often users should receive maintenance on their HCs, and what DRSs, dealers/installers, and users would like to see in the future.

  5. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CEMS must be installed at both the inlet and outlet of the control device. If you are meeting a requirement to limit the concentration of CO, the CEMS must be installed at the outlet of the control device... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If...

  6. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  7. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  8. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  9. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  10. 49 CFR 236.1043 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1043 Task analysis and basic requirements. (a) Training structure and... installation, maintenance, repair, modification, inspection, testing, and operating tasks that must be...

  11. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  12. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  13. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  14. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  15. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  16. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  17. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  18. Irrigation Controllers

    EPA Pesticide Factsheets

    With proper installation, programming, and maintenance, homeowners and businesses can use WaterSense labeled controllers instead of standard clock-timer controllers on their existing systems, and no longer worry about wasted water.

  19. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  20. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  1. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  2. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  3. 32 CFR 634.4 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installations by participating in traffic control studies designed to obtain information on traffic problems and... phase of engineering concerned with the planning, design, construction, and maintenance of streets, highways, and abutting lands. (2) Select, determine appropriate design, procure, construct, install, and...

  4. 23 CFR 630.1102 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... zone fatalities and injuries to workers and road users by establishing minimum requirements and..., installation and maintenance of temporary traffic control devices, and use of uniformed law enforcement officers during construction, utility, and maintenance operations, and by requiring contract pay items to...

  5. 41 CFR 102-33.170 - What standards must we establish or require (contractually, where applicable) for maintenance of...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appliance repairs, modifications, or equipment installations. (e) A quality control system for acquiring... tracking maintenance actions; inspections; and the flight hours, cycles, and calendar times of life-limited...

  6. Operation and maintenance results from ISFOC CPV plants

    NASA Astrophysics Data System (ADS)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  7. 23 CFR 630.1002 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... mobility of road users and highway workers. These safety and mobility impacts are exacerbated by an aging... prescribes standards for the design, application, installation, and maintenance of traffic control devices for highway and street construction, maintenance operation, and utility work. In addition to the...

  8. Installation package for integrated programmable electronic controller and hydronic subsystem - solar heating and cooling

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.

  9. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  10. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  11. 49 CFR 236.26 - Buffing device, maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions... be maintained so as not to cause the signal to display a less restrictive aspect than intended. Track...

  12. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  13. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  14. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  15. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  16. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  17. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  18. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  19. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  20. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  1. 46 CFR 183.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...

  2. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...

  3. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  4. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  5. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  6. 40 CFR 125.94 - How will requirements reflecting best technology available for minimizing adverse environmental...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in your facility's watershed in place of or as a supplement to installing design and control... construction, operational, maintenance, monitoring, and adaptive management requirements of a Technology..., and adaptive management requirements of your Technology Installation and Operation Plan during the...

  7. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  8. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  9. 10 CFR 434.403 - Building mechanical systems and equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Insulation. All supply and return air ducts and plenums installed as part of an HVAC air distribution system... maintenance shall be provided. (d) HVAC controls systems maintenance and calibration information, including... HVAC systems be balanced in accordance with the industry accepted procedures (such as National...

  10. Installation package for a solar heating and hot water system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  12. 49 CFR 236.529 - Roadway element inductor; height and distance from rail.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  13. 49 CFR 236.529 - Roadway element inductor; height and distance from rail.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  14. 49 CFR 236.577 - Test, acknowledgement, and cut-in circuits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Inspection and Tests; Roadway § 236.577 Test...

  15. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  16. Installation package for SIMS prototype system 2, solar hot water

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The prototype system 2 solar hot water was designed for use in a single family dwelling and consists of the following subsystems: collector, storage, energy transport, and control. Guidelines are presented for utilization in the development of detailed installation plans and specifications. Instruction on operation, maintenance, and repair of the system is discussed.

  17. 40 CFR 63.2366 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What are my monitoring installation... Distribution (Non-Gasoline) Testing and Initial Compliance Requirements § 63.2366 What are my monitoring... controlling storage tanks and low throughput transfer racks, you must submit a monitoring plan according to...

  18. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  19. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...

  20. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... that emissions are controlled with a common control device or series of control devices, are discharged... parallel control devices or multiple series of control devices are discharged to the atmosphere through... quality control activities (including, as applicable, calibration checks and required zero and span...

  1. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  2. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  3. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  4. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  5. 49 CFR 236.60 - Switch shunting circuit; use restricted.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and... circuit shall not be hereafter installed, except where tract or control circuit is opened by the circuit controller. [49 FR 3384, Jan. 26, 1984] Wires and Cables ...

  6. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  7. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  8. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  9. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  10. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  11. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  12. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  13. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  14. 49 CFR 236.1045 - Training specific to office control personnel.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... between the computer-aided dispatching system and the train control system, with respect to the safe... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1045 Training specific to office control personnel. (a) Any person...

  15. 49 CFR 236.925 - Training specific to control office personnel.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... concerning the interface between the computer-aided dispatching system and the train control system, with... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.925 Training specific to control office...

  16. Installation package maxi-therm S-101 heating module

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.

  17. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  18. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  19. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  20. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  1. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  2. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  3. 30 CFR 77.305 - Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Access to drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. 77.305 Section 77.305 Mineral Resources MINE SAFETY... drying chambers, hot gas inlet chambers and ductwork; installation and maintenance. Drying chambers, hot...

  4. 49 CFR 236.511 - Cab signals controlled in accordance with block conditions stopping distance in advance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... automatic cab signal system shall be arranged so that cab signals will be continuously controlled in...

  5. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  6. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  7. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  8. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  9. 49 CFR 236.5 - Design of control circuits on closed circuit principle.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Design of control circuits on closed circuit... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems General § 236.5 Design of control circuits on...

  10. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...

  11. 49 CFR 236.534 - Entrance to equipped territory; requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...

  12. 49 CFR 236.534 - Entrance to equipped territory; requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions; Roadway § 236.534... not exceed restricted speed, the automatic train stop, train control, or cab signal device shall be...

  13. 40 CFR 63.10010 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emissions are controlled with a common control device or series of control devices, are discharged to the... devices or multiple series of control devices are discharged to the atmosphere through more than one stack... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  14. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  15. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  16. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  17. Perceptual/Psychomotor Requirements Basic to performance in 35 Air Force Specialties.

    DTIC Science & Technology

    1980-12-01

    Supra-segmental Reflexes c 26. Locomotor Movements¢ 27. Non- Locomotor Movementac 28. Manipulative Movements c 29. Kinesthetic Discrimination 30...auxiliary equipment components for installation (6.10, Ground Radio Equipment Repair) Control Operate standard gasoline or electric powered forklifts...Precision (6.23, Munitions Maintenance) Operate munitions transport trucks or truck-tractors (6.19, Munitions Maintenance) Rate operate standard gasoline or

  18. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  19. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  20. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  1. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  2. 49 CFR 236.505 - Proper operative relation between parts along roadway and parts on locomotive.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards... all conditions of speed, weather, wear, oscillation, and shock. ...

  3. 49 CFR 236.504 - Operation interconnected with automatic block-signal system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.504... or train control system shall operate in connection with an automatic block signal system and shall...

  4. 49 CFR 236.506 - Release of brakes after automatic application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.506 Release of brakes after automatic application. The automatic train stop or train control apparatus shall prevent release of the...

  5. 49 CFR 236.207 - Electric lock on hand-operated switch; control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.207 Electric lock on hand-operated... 49 Transportation 4 2011-10-01 2011-10-01 false Electric lock on hand-operated switch; control...

  6. 49 CFR 236.528 - Restrictive condition resulting from open hand-operated switch; requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and... with circuit controller is used, the resultant restrictive condition of an automatic train stop or...

  7. 49 CFR 236.528 - Restrictive condition resulting from open hand-operated switch; requirement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and... with circuit controller is used, the resultant restrictive condition of an automatic train stop or...

  8. 49 CFR 236.506 - Release of brakes after automatic application.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.506 Release of brakes after automatic application. The automatic train stop or train control apparatus shall prevent release of the...

  9. 49 CFR 236.202 - Signal governing movements over hand-operated switch.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.202 Signal governing movements over hand...

  10. Rapid Transit Subways - Maintenance Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  11. 49 CFR 236.921 - Training and qualification program, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Standards for Processor-Based Signal and Train Control Systems § 236.921 Training and qualification program..., wayside, or onboard subsystems; (2) Persons who dispatch train operations (issue or communicate any...

  12. 49 CFR 236.1041 - Training and qualification program, general.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1041 Training and qualification program, general. (a) Training program...-critical elements of the railroad's PTC systems, including central office, wayside, or onboard subsystems...

  13. 49 CFR 236.204 - Track signaled for movements in both directions, requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...

  14. 49 CFR 236.204 - Track signaled for movements in both directions, requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.204 Track signaled for movements in both...

  15. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  16. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  17. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  18. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  19. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  20. 49 CFR 236.73 - Open-wire transmission line; clearance to other circuits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.73 Open-wire transmission...

  1. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  2. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  3. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  4. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  5. 48 CFR 242.202 - Assignment of contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., charting, and geodesy services; (F) Base, post, camp, and station purchases; (G) Operation or maintenance... installation, test, and checkout of the missiles and associated equipment); (Q) Operation and maintenance of, or installation of equipment at, military test ranges, facilities, and installations; and (R) The...

  6. 49 CFR 236.508 - Interference with application of brakes by means of brake valve.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.508 Interference with application of brakes by means of brake valve. The automatic train stop, train control, or...

  7. 49 CFR 236.508 - Interference with application of brakes by means of brake valve.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.508 Interference with application of brakes by means of brake valve. The automatic train stop, train control, or...

  8. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  9. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  10. 49 CFR 236.1011 - PTC Implementation Plan content requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... technology embedded in PTC systems that does not employ all of the functionalities required by this subpart... INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Positive Train Control Systems § 236.1011 PTC Implementation Plan content requirements. (a) Contents. A...

  11. Energy Control Systems: Energy Savings.

    ERIC Educational Resources Information Center

    School Business Affairs, 1980

    1980-01-01

    The installation of proper control systems is estimated as saving up to 25 percent of the energy used in schools. Other potential energy-saving areas are transmission (heat loss or gain through walls, especially ceilings); internal load (heat from students, lights, and machinery); ventilation; and equipment maintenance. (Author/MLF)

  12. Cables.

    PubMed

    Cushing, M

    1994-01-01

    If you want to control your own computer installation, get the satisfaction of doing your own maintenance, and compensate for an inept or uninformed vendor, the information in this article will help you achieve these ends. Good luck and good cabling!

  13. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  14. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial installation and after major maintenance. THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon initial installation, within 185 days before...

  15. 40 CFR 610.23 - Operator interaction effects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...

  16. 30 CFR 57.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 57.9307 Section 57.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF..., Railroads, and Loading and Dumping Sites § 57.9307 Design, installation, and maintenance of railroads. Roadbeds and all elements of the railroad tracks shall be designed, installed, and maintained to provide...

  17. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  18. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  19. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  20. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  1. 30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...

  2. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  3. 46 CFR 120.200 - General design, installation, and maintenance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...

  4. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  5. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  6. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  7. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  8. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  9. Installation, care, and maintenance of wood shake and shingle siding

    Treesearch

    Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...

  10. 49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cut out en route. 236.567 Section 236.567 Transportation Other Regulations Relating to Transportation... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions...

  11. 49 CFR 236.514 - Interconnection of cab signal system with roadway signal system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.514 Interconnection of cab signal system with roadway signal system. The automatic cab signal system shall be...

  12. 49 CFR 236.554 - Rate of pressure reduction; equalizing reservoir or brake pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... pressure or brake-pipe pressure reduction during an automatic brake application shall be at a rate not less...

  13. 49 CFR 236.554 - Rate of pressure reduction; equalizing reservoir or brake pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... pressure or brake-pipe pressure reduction during an automatic brake application shall be at a rate not less...

  14. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  15. 40 CFR 1045.130 - What installation instructions must I give to vessel manufacturers?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... engine's emission control information label hard to read during normal engine maintenance, you must place... equivalent format. For example, you may post instructions on a publicly available Web site for downloading or...

  16. 40 CFR 1054.130 - What installation instructions must I give to equipment manufacturers?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... makes the engine's emission control information label hard to read during normal engine maintenance, you... in an equivalent format. For example, you may post instructions on a publicly available Web site for...

  17. The influence of maintenance quality of hemodialysis machines on hemodialysis efficiency.

    PubMed

    Azar, Ahmad Taher

    2009-01-01

    Several studies suggest that there is a correlation between dose of dialysis and machine maintenance. However, in spite of the current practice, there are conflicting reports regarding the relationship between dose of dialysis or patient outcome, and machine maintenance. In order to evaluate the impact of hemodialysis machine maintenance on dialysis adequacy Kt/V and session performance, data were processed on 134 patients on 3-times-per-week dialysis regimens by dividing the patients into four groups and also dividing the hemodialysis machines into four groups according to their year of installation. The equilibrated dialysis dose eq Kt/V, urea reduction ratio (URR) and the overall equipment effectiveness (OEE) were calculated in each group to show the effect hemodialysis machine efficiency on the overall session performance. The average working time per machine per month was 270 hours. The cumulative number of hours according to the year of installation was: 26,122 hours for machines installed in 1998; 21,596 hours for machines installed in 1999, 8362 hours for those installed in 2003 and 2486 hours for those installed in 2005. The mean time between failures (MTBF) was 1.8, 2.1, 4.2 and 6 months between failures for machines installed in 1999, 1998, 2003 and 2005, respectively. Statistical analysis demonstrated that the dialysis dose eq Kt/V and URR were increased as the overall equipment effectiveness (OEE) increases with regular maintenance procedures. Maintenance has become one of the most expedient approaches to guarantee high machine dependability. The efficiency of dialysis machine is relevant in assuring a proper dialysis adequacy.

  18. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  19. 30 CFR 77.516 - Electric wiring and equipment; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric wiring and equipment; installation and... OF UNDERGROUND COAL MINES Electrical Equipment-General § 77.516 Electric wiring and equipment; installation and maintenance. In addition to the requirements of §§ 77.503 and 77.506, all wiring and...

  20. Installation, care, and maintenance of wood shake and shingle roofs

    Treesearch

    Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...

  1. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  2. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  3. 49 CFR 236.76 - Tagging of wires and interference of wires or tags with signal apparatus.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.76 Tagging of...

  4. Advance traffic control warning systems for maintenance operations : final report.

    DOT National Transportation Integrated Search

    1976-07-01

    The report discusses the effect of certain variables defined by sign size, height of installation and legend on the driver responses as measured by speed, conflict and queuing parameters. Effects of electronically actuated, directional flashing signs...

  5. 49 CFR 236.329 - Bolt lock.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Interlocking Rules and Instructions... derail and displaying an aspect indicating stop cannot be operated to display a less restrictive aspect...

  6. Development of Range Design Elements and Quality Control/Quality Assurance Guidance to Reduce Maintenance Requirements on Training Ranges

    DTIC Science & Technology

    2006-11-01

    exercises. Potential Resolution: 1. Installations must ensure that they understand the composition of civilian populations outside of their...Installation trainers, SRP Support Agency trainers or contract training specialists should layout each range based on the composition defined in the...defined time limit to respond to submittals with a pre-defined team member composition so that changes could be reviewed consistently. Only mission

  7. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  8. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  9. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  10. 33 CFR 157.12c - Construction, maintenance, security, calibration, and training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RELATING TO TANK VESSELS CARRYING OIL IN BULK Design, Equipment, and Installation § 157.12c Construction... designed to ensure that user access is restricted to essential controls. Access beyond these controls must... of a design that only the manufacturer or the manufacturer's agent can replace the seals or reset the...

  11. 49 CFR 236.560 - Contact element, mechanical trip type; location with respect to rail.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and.... Contact element of automatic train stop device of the mechanical trip type shall be maintained at a height...

  12. 49 CFR 236.567 - Restrictions imposed when device fails and/or is cut out en route.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Rules and Instructions... restricted speed or if an automatic block signal system is in operation according to signal indication but...

  13. Development of a traffic control devices and pavement markings manual for Iowa's cities and counties with a survey of common practices

    DOT National Transportation Integrated Search

    2001-04-01

    The purpose of this project was to develop and distribute a manual that would provide local agencies in Iowa with practical advice and guidance for traffic control devices and pavement markings installation and maintenance. The project included the f...

  14. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...

  15. 49 CFR 236.714 - Cab.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Definitions § 236.714 Cab. The compartment of a locomotive from which the propelling power and power brakes of the train are manually...

  16. 49 CFR 236.2 - Grounds.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., single-break, signal control circuits using a grounded common, and alternating current power distribution... TRANSPORTATION RULES, STANDARDS, AND INSTRUCTIONS GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR... General § 236.2 Grounds. Each circuit, the functioning of which affects the safety of train operations...

  17. 78 FR 37657 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ... Division of the Regional Transportation Authority (Metra) and its operating company, the Northeast Illinois... CFR Part 236, Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance... each train operating in train stop, train control or cab signal territory; equipped. Specifically...

  18. Solar heating and hot water system installed at James Hurst Elementary School, Portsmouth, Virginia

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Solar heating and a hot water system installed in an elementary school in Portsmouth, Virginia are examined. The building is zoned into four heating/cooling areas. Each area is equipped with an air handling unit that is monitored and controlled by central control and monitoring system. The solar system for the building uses a collector area of 3,630 sq. ft. of flat plate liquid collectors, and a 6,000 gallon storage tank. System descriptions, maintenance reports, detailed component specifications, and design drawings to evaluate this solar system are reported.

  19. 49 CFR 236.923 - Task analysis and basic requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... classroom, simulator, computer-based, hands-on, or other formally structured training and testing, except... for Processor-Based Signal and Train Control Systems § 236.923 Task analysis and basic requirements...) Based on a formal task analysis, identify the installation, maintenance, repair, modification...

  20. 30 CFR 57.4561 - Stationary diesel equipment underground.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....4561 Section 57.4561 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4561 Stationary diesel equipment...

  1. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  2. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  3. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  4. 40 CFR 1051.205 - What must I include in my application?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emission control devices (AECDs) and all fuel-system components you will install on any production or test... specifications and other basic parameters of the vehicle's design and emission controls. List the fuel type on... scheduled maintenance you did. (g) List the specifications of the test fuel to show that it falls within the...

  5. 14 CFR Appendix A to Part 43 - Major Alterations, Major Repairs, and Preventive Maintenance

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hub design. (iii) Changes in the governor or control design. (iv) Installation of a propeller governor.... (iv) Engine mounts. (v) Control system. (vi) Landing gear. (vii) Hull or floats. (viii) Elements of an... of gravity limits of the aircraft. (xii) Changes to the basic design of the fuel, oil, cooling...

  6. Rapid Transit Subways - Guidelines for Engineering New Installations for Reduced Maintenance

    DOT National Transportation Integrated Search

    1978-01-01

    Economic design of new subways requires optimization of installation and maintenance costs of all the major constituent items. A prerequisite for this is an awareness of the rigorous environmental and other conditions imposed on the subway. Changing ...

  7. Flow-Control Unit For Nitrogen And Hydrogen Gases

    NASA Technical Reports Server (NTRS)

    Chang, B. J.; Novak, D. W.

    1990-01-01

    Gas-flow-control unit installed and removed as one piece replaces system that included nine separately serviced components. Unit controls and monitors flows of nitrogen and hydrogen gases. Designed for connection via fluid-interface manifold plate, reducing number of mechanical fluid-interface connections from 18 to 1. Unit provides increasing reliability, safety, and ease of maintenance, and for reducing weight, volume, and power consumption.

  8. Safe and Sanitary.

    ERIC Educational Resources Information Center

    Turner, Ed; Hauser, Dan

    1994-01-01

    Explains how daily maintenance and design planning can reduce the potential safety hazards found in athletic-facility locker rooms. Topics include designing locker rooms for visual openness and traffic control, providing non-slip surfaces and proper drainage, installing ventilation systems that can handle the moisture produced in locker rooms,…

  9. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  10. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  11. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  12. 30 CFR 57.4532 - Blacksmith shops.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Blacksmith shops. 57.4532 Section 57.4532 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE... Control Installation/construction/maintenance § 57.4532 Blacksmith shops. Blacksmith shops located on the...

  13. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  14. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  15. 49 CFR 236.108 - Insulation resistance tests, wires in trunking and cables.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cables. 236.108 Section 236.108 Transportation Other Regulations Relating to Transportation (Continued... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES... Insulation resistance tests, wires in trunking and cables. (a) Insulation resistance of wires and cables...

  16. 30 CFR 57.4561 - Stationary diesel equipment underground.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Stationary diesel equipment underground. 57... Fire Prevention and Control Installation/construction/maintenance § 57.4561 Stationary diesel equipment underground. Stationary diesel equipment underground shall be— (a) Supported on a noncombustible base; and (b...

  17. 30 CFR 57.4502 - Battery-charging stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Battery-charging stations. 57.4502 Section 57... and Control Installation/construction/maintenance § 57.4502 Battery-charging stations. (a) Battery... shall be prohibited at the battery charging station during battery charging. (c) Readily visible signs...

  18. 30 CFR 56.4502 - Battery-charging stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Battery-charging stations. 56.4502 Section 56... Control Installation/construction/maintenance § 56.4502 Battery-charging stations. (a) Battery-charging... prohibited at the battery charging station during battery charging. (c) Readily visible signs prohibiting...

  19. 30 CFR 56.4502 - Battery-charging stations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Battery-charging stations. 56.4502 Section 56... Control Installation/construction/maintenance § 56.4502 Battery-charging stations. (a) Battery-charging... prohibited at the battery charging station during battery charging. (c) Readily visible signs prohibiting...

  20. 30 CFR 57.4502 - Battery-charging stations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Battery-charging stations. 57.4502 Section 57... and Control Installation/construction/maintenance § 57.4502 Battery-charging stations. (a) Battery... shall be prohibited at the battery charging station during battery charging. (c) Readily visible signs...

  1. 30 CFR 56.4502 - Battery-charging stations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Battery-charging stations. 56.4502 Section 56... Control Installation/construction/maintenance § 56.4502 Battery-charging stations. (a) Battery-charging... prohibited at the battery charging station during battery charging. (c) Readily visible signs prohibiting...

  2. 30 CFR 57.4502 - Battery-charging stations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Battery-charging stations. 57.4502 Section 57... and Control Installation/construction/maintenance § 57.4502 Battery-charging stations. (a) Battery... shall be prohibited at the battery charging station during battery charging. (c) Readily visible signs...

  3. 30 CFR 56.4502 - Battery-charging stations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Battery-charging stations. 56.4502 Section 56... Control Installation/construction/maintenance § 56.4502 Battery-charging stations. (a) Battery-charging... prohibited at the battery charging station during battery charging. (c) Readily visible signs prohibiting...

  4. 30 CFR 56.4502 - Battery-charging stations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Battery-charging stations. 56.4502 Section 56... Control Installation/construction/maintenance § 56.4502 Battery-charging stations. (a) Battery-charging... prohibited at the battery charging station during battery charging. (c) Readily visible signs prohibiting...

  5. 30 CFR 57.4502 - Battery-charging stations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Battery-charging stations. 57.4502 Section 57... and Control Installation/construction/maintenance § 57.4502 Battery-charging stations. (a) Battery... shall be prohibited at the battery charging station during battery charging. (c) Readily visible signs...

  6. 30 CFR 57.4502 - Battery-charging stations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Battery-charging stations. 57.4502 Section 57... and Control Installation/construction/maintenance § 57.4502 Battery-charging stations. (a) Battery... shall be prohibited at the battery charging station during battery charging. (c) Readily visible signs...

  7. Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaba, R.L.; Petrie, T.W.

    1999-03-16

    The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed costmore » and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.« less

  8. 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less

  9. 30 CFR 56.9307 - Design, installation, and maintenance of railroads.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... railroads. 56.9307 Section 56.9307 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF... MINES Loading, Hauling, and Dumping Safety Devices, Provisions, and Procedures for Roadways, Railroads, and Loading and Dumping Sites § 56.9307 Design, installation, and maintenance of railroads. Roadbeds...

  10. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  11. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  12. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  13. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  14. 10 CFR 35.605 - Installation, maintenance, adjustment, and repair.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Installation, maintenance, adjustment, and repair. 35.605 Section 35.605 Energy NUCLEAR REGULATORY COMMISSION MEDICAL USE OF BYPRODUCT MATERIAL Photon Emitting Remote Afterloader Units, Teletherapy Units, and Gamma Stereotactic Radiosurgery Units § 35.605...

  15. First Experiences Of ISFOC In The Maintenance Of CPV Plants

    NASA Astrophysics Data System (ADS)

    Sánchez, D.; Martínez, M.; Gil, E.; Rubio, F.; Pachón, J. L.; Banda, P.

    2010-10-01

    ISFOC CPV Plants are now working in normal operation, so ISFOC is beginning with the Maintenance. Like a first approximation, we have analyzed the incidences in the Energy generation. This analysis results that the tracker is the most vulnerable element of the installation, what it is reasonable, because it is the only mechanical element. In this business, the corrective actions for the Maintenance are very expensive; therefore it is mandatory to define a good policy for the Preventive Maintenance. With this idea, ISFOC is implementing Industrial tools (SCP) to control the Energy generation in order to maintain the Plants operating at its full potential. In this paper, we present the approach we are making to adapt the method to measure the energy generated by the concentrators and how the control charts can be used to organize the Preventive Maintenance actions. Finally, the first results are presented, where we show the potential of this method to organize the Maintenance at the same time we have initial calculations for the availability of the plants obtained with this method.

  16. 30 CFR 57.4530 - Exits for surface buildings and structures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....4530 Section 57.4530 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4530 Exits for surface buildings...

  17. Guidelines for the installation, inspection, maintenance and repair of structural supports for highway signs, luminaires, and traffic signals

    DOT National Transportation Integrated Search

    2005-03-01

    This document provides guidance for the installation, inspection, maintenance, and repair of structural supports for highway signs, luminaires and traffic signals. The primary purpose is to provide owners with information that can assist them in mana...

  18. Donald Baker | NREL

    Science.gov Websites

    -7162 Don assists with the installation and maintenance of the NWTC's field test turbines as well as with test article installations and testing in the Structural Testing Laboratory and both dynamometer facilities. He participates in the operation and maintenance of the field test sites and meteorological

  19. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...

  20. 14 CFR 33.5 - Instruction manual for installing and operating the engine.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...

  1. 14 CFR 33.5 - Instruction manual for installing and operating the engine.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...

  2. 14 CFR 33.5 - Instruction manual for installing and operating the engine.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...

  3. 14 CFR 33.5 - Instruction manual for installing and operating the engine.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...

  4. 14 CFR 33.5 - Instruction manual for installing and operating the engine.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... devices, maintenance checks, and similar equipment or procedures that are outside the control of the... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: AIRCRAFT ENGINES General § 33.5 Instruction manual for... attaching the engine to the aircraft, and the maximum allowable load for the mounting attachments and...

  5. 49 CFR 236.514 - Interconnection of cab signal system with roadway signal system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Interconnection of cab signal system with roadway signal system. 236.514 Section 236.514 Transportation Other Regulations Relating to Transportation... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES...

  6. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  7. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  8. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  9. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... monitor an add-on air pollution control device, you must meet the requirements in paragraphs (g)(1) and (2... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for...

  10. 40 CFR 63.467 - Recordkeeping requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...

  11. 40 CFR 63.467 - Recordkeeping requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...

  12. 40 CFR 63.467 - Recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...

  13. 40 CFR 63.467 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of a batch vapor or in-line solvent cleaning machine complying with the provisions of § 63.463 shall... for the lifetime of the machine. (1) Owner's manuals, or if not available, written maintenance and operating procedures, for the solvent cleaning machine and control equipment. (2) The date of installation...

  14. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...

  15. 40 CFR 63.11224 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assurance or control activities (including, as applicable, calibration checks and required zero and span... applicable, calibration checks and required zero and span adjustments) do not constitute monitoring... required zero and span adjustments), you must conduct all monitoring in continuous operation at all times...

  16. 40 CFR 90.113 - In-use testing program for Phase 1 engines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emission control technology which most likely will be used on Phase 2 engines; (2) Engine families using... technology specifically installed to achieve compliance with emission standards of this part; (6) The engine... with itself or its vehicle manufacturer. (2) A test engine should have a maintenance history...

  17. 40 CFR 1065.303 - Summary of required calibration and verifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: FID calibrationTHC FID optimization, and THC FID verification Calibrate all FID analyzers: upon initial installation and after major maintenance.Optimize and determine CH4 response for THC FID analyzers: upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers: upon...

  18. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  19. 40 CFR 1065.303 - Summary of required calibration and verifications

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... THC FID optimization, and THC FID verification Optimize and determine CH4 response for THC FID analyzers: Upon initial installation and after major maintenance. Verify CH4 response for THC FID analyzers.... For THC FID analyzers: Upon initial installation, after major maintenance, and after FID optimization...

  20. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  1. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  2. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  3. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  4. 14 CFR 221.180 - Requirements for electronic filing of tariffs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of Transportation, for the maintenance and security of the on-line tariff database. (b) No carrier or... to its on-line tariff database. The filer shall be responsible for the transportation, installation... installation or maintenance. (3) The filer shall provide public access to its on-line tariff database, at...

  5. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  6. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength andmore » stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation.« less

  7. GOES data-collection system instrumentation, installation, and maintenance manual

    USGS Publications Warehouse

    Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.

    1986-01-01

    The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)

  8. CERN experience and strategy for the maintenance of cryogenic plants and distribution systems

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.

    2015-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.

  9. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  10. Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.

  11. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  12. Preliminary Guidelines for Safe and Effective Use of Hot, High-Pressure Washers for Maintenance Cleaning of Army Vehicles.

    DTIC Science & Technology

    1982-11-01

    26AS TACT (Ctbm onrols st N 19m4i60M, = de IdIM b o1ck numbef) - >While hot, high-pressure washers clean effectively, they can also damage parts on Army...conserve water resources, and reduce the costs of wastewater treatment. The objec- At most Army installations, maintenance cleaning tive of the phase of...Itios Catalog Code 214. Posary not only to control the parameters involved for a more accurate assessment of the potential for damage. 2R. I de ~cia

  13. Natural Bridges National Monument photovoltaic power plant operations manual

    NASA Astrophysics Data System (ADS)

    Coleman, S. D.

    1982-02-01

    After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.

  14. Investigation of pump and pump switch failures in rainwater harvesting systems

    NASA Astrophysics Data System (ADS)

    Moglia, Magnus; Gan, Kein; Delbridge, Nathan; Sharma, Ashok K.; Tjandraatmadja, Grace

    2016-07-01

    Rainwater harvesting is an important technology in cities that can contribute to a number of functions, such as sustainable water management in the face of demand growth and drought as well as the detention of rainwater to increase flood protection and reduce damage to waterways. The objective of this article is to investigate the integrity of residential rainwater harvesting systems, drawing on the results of the field inspection of 417 rainwater systems across Melbourne that was combined with a survey of householders' situation, maintenance behaviour and attitudes. Specifically, the study moves beyond the assumption that rainwater systems are always operational and functional and draws on the collected data to explore the various reasons and rates of failure associated with pumps and pump switches, leaving for later further exploration of the failure in other components such as the collection area, gutters, tank, and overflows. To the best of the authors' knowledge, there is no data like this in academic literature or in the water sector. Straightforward Bayesian Network models were constructed in order to analyse the factors contributing to various types of failures, including system age, type of use, the reason for installation, installer, and maintenance behaviour. Results show that a number of issues commonly exist, such as failure of pumps (5% of systems), automatic pump switches that mediate between the tank and reticulated water (9% of systems), and systems with inadequate setups (i.e. no pump) limiting their use. In conclusion, there appears to be a lack of enforcement or quality controls in both installation practices by sometimes unskilled contractors and lack of ongoing maintenance checks. Mechanisms for quality control and asset management are required, but difficult to promote or enforce. Further work is needed into how privately owned assets that have public benefits could be better managed.

  15. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  16. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  17. 40 CFR 63.5995 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for continuity, oxidation, and galvanic corrosion. (c) For each integrating regeneration stream flow... a device that is capable of recording the total regeneration stream mass or volumetric flow for each regeneration cycle. (d) For any other control device, or for other capture systems, ensure that the CPMS is...

  18. 30 CFR 57.4531 - Surface flammable or combustible liquid storage buildings or rooms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 57.4531 Surface... fire resistance rating of at least one hour; or (2) Equipped with an automatic fire supression system...

  19. 30 CFR 56.4531 - Flammable or combustible liquid storage buildings or rooms.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Installation/construction/maintenance § 56.4531 Flammable or...) In addition, the buildings or rooms shall be— (1) Constructed to meet a fire resistance rating of at...

  20. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  1. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... audit, and an annual zero alignment audit of each COMS. (6) You must operate and maintain each COMS... assessment, a quarterly performance audit, or an annual zero alignment audit. (7) You must determine and... control activities (including, as applicable, calibration checks and required zero and span adjustments...

  2. Modular control subsystems for use in solar heating systems for multi-family dwellings

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Progress in the development of solar heating modular control subsystems is reported. Circuit design, circuit drawings, and printed circuit board layout are discussed along with maintenance manuals, installation instructions, and verification and acceptance tests. Calculations made to determine the predicted performance of the differential thermostat are given including details and results of tests for the offset temperature, and boil and freeze protect points.

  3. 32 CFR Appendix C to Subpart M of... - Authorized Activities for Maneuver Training Area Access

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... commercial use (AR 405-80) Installation service and maintenance (AR 420-74, FL Reg 350-30) Non-DoD personnel...-1) Horseback riding on roads and vehicle tracks Walking, distance running Model airplane and rocket...) Installation service and maintenance (AR 420-74) Non-Commercial recreational use: Hunting, fishing and trapping...

  4. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? 63.2164 Section 63.2164 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...

  5. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  6. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  7. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  8. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  9. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  10. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  11. Unsurfaced Road Maintenance Management

    DOT National Transportation Integrated Search

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  12. Flat-plate solar collector - installation package

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  13. 48 CFR 217.171 - Multiyear contracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... agency may enter into multiyear contracts for supplies and services required for management, maintenance..., maintenance, and support of facilities and installations. (ii) Maintenance or modification of aircraft, ships... services (e.g., ground maintenance, in-plane refueling, bus transportation, and refuse collection and...

  14. Manual of good practices for sanitation in coal mining operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of the manual was to act as a guideline, setting reasonable recommendations relative to mine sanitation which will enable mines to install adequate facilities and make appropriate alterations conserving and improving the health and welfare of the mine worker. A systematic evaluation was undertaken of the sanitation facilities and maintenance at coal mines. Consideration was given to central facilities including building, floors, walls, partitions, ceilings, lockers, baskets and benches, showers, toilets, lavatories, lighting, ventilation and temperature control, and maintenance. Also discussed were food vending machines, water source, water quality, water treatment, water delivery systems for underground and surfacemore » mines, sanitary waste disposal, workplace toilets in underground and surface mines, refuse control and handling for underground and surface mines, and pest control.« less

  15. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  16. Understanding, Classifying, and Selecting Environmentally Acceptable Hydraulic Fluids

    DTIC Science & Technology

    2016-08-01

    installed in land facilities or off- road vehicles such as excavators, bulldozers, backhoes, etc.), while others are installed on floating plants...and oily bilge tanks for the collection and proper disposal of oil- contaminated bilge water • Performing routine maintenance , including regular...regulations. Maintenance of machinery systems containing EA hydraulic fluids must strictly follow the hydraulic fluid manufacturer’s recommendations

  17. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  18. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  19. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  20. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  1. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  2. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  3. Expedition 48/49 crew visit to MSFC

    NASA Image and Video Library

    2017-04-06

    NASA astronaut Kate Rubins presents highlights from Expedition 48/49, her mission to the International Space Station, to team members and Space Camp students from the U.S. Space & Rocket Center in Huntsville, April 6 at NASA's Marshall Space Flight Center. During her mission, Rubins became the first person to sequence DNA in space, researching technology development for deep-space exploration by humans, Earth and space science. She also conducted two spacewalks, in which she and NASA astronaut Jeff Williams installed an International Docking Adapter and performed maintenance of the station's external thermal control system and installed high-definition cameras.

  4. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...

  5. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... control device, you must monitor on a continuous basis your catalyst inlet temperature in order to comply... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...

  6. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... control device, you must monitor on a continuous basis your catalyst inlet temperature in order to comply... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...

  7. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to... combustion turbine which fires landfill gas or digester gas equivalent to 10 percent or more of the gross... the major source with a non-resettable hour meter to measure the number of hours that distillate oil...

  8. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...

  9. 40 CFR 63.5545 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... process unit such that the measurement is representative of control of the exhaust emissions (e.g., on or..., and validation check. (9) Except for redundant sensors, any device that is used to conduct an initial validation or accuracy audit of a CPMS must meet the accuracy requirements specified in paragraphs (f)(9)(i...

  10. Obstacle negotiation control for a mobile robot suspended on overhead ground wires by optoelectronic sensors

    NASA Astrophysics Data System (ADS)

    Zheng, Li; Yi, Ruan

    2009-11-01

    Power line inspection and maintenance already benefit from developments in mobile robotics. This paper presents mobile robots capable of crossing obstacles on overhead ground wires. A teleoperated robot realizes inspection and maintenance tasks on power transmission line equipment. The inspection robot is driven by 11 motor with two arms, two wheels and two claws. The inspection robot is designed to realize the function of observation, grasp, walk, rolling, turn, rise, and decline. This paper is oriented toward 100% reliable obstacle detection and identification, and sensor fusion to increase the autonomy level. An embedded computer based on PC/104 bus is chosen as the core of control system. Visible light camera and thermal infrared Camera are both installed in a programmable pan-and-tilt camera (PPTC) unit. High-quality visual feedback rapidly becomes crucial for human-in-the-loop control and effective teleoperation. The communication system between the robot and the ground station is based on Mesh wireless networks by 700 MHz bands. An expert system programmed with Visual C++ is developed to implement the automatic control. Optoelectronic laser sensors and laser range scanner were installed in robot for obstacle-navigation control to grasp the overhead ground wires. A novel prototype with careful considerations on mobility was designed to inspect the 500KV power transmission lines. Results of experiments demonstrate that the robot can be applied to execute the navigation and inspection tasks.

  11. View of MS Williams installing the new CMG during Expedition 15/STS-118 EVA 2

    NASA Image and Video Library

    2007-08-13

    ISS015-E-22358 (13 Aug. 2007) --- Astronaut Dave Williams, STS-118 mission specialist representing the Canadian Space Agency, participates in the mission's second planned session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 6-hour, 28-minute spacewalk Williams and astronaut Rick Mastracchio (out of frame), mission specialist, removed a faulty control moment gyroscope (CMG-3) and installed a new CMG into the station's Z1 truss. The failed CMG will remain at its temporary stowage location on the station's exterior until it is returned to Earth on a later shuttle mission. The new gyroscope is one of four CMGs that are used to control the station's attitude in orbit.

  12. View of MS Williams installing the new CMG during Expedition 15/STS-118 EVA 2

    NASA Image and Video Library

    2007-08-13

    ISS015-E-22371 (13 Aug. 2007) --- Astronaut Dave Williams, STS-118 mission specialist representing the Canadian Space Agency, participates in the mission's second planned session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 6-hour, 28-minute spacewalk, Williams and astronaut Rick Mastracchio (out of frame), mission specialist, removed a faulty control moment gyroscope (CMG-3) and installed a new CMG into the station's Z1 truss. The failed CMG will remain at its temporary stowage location on the station's exterior until it is returned to Earth on a later shuttle mission. The new gyroscope is one of four CMGs that are used to control the station's attitude in orbit.

  13. View of MS Williams installing the new CMG during Expedition 15/STS-118 EVA 2

    NASA Image and Video Library

    2007-08-13

    ISS015-E-22355 (13 Aug. 2007) --- Astronaut Dave Williams, STS-118 mission specialist representing the Canadian Space Agency, participates in the mission's second planned session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 6-hour, 28-minute spacewalk Williams and astronaut Rick Mastracchio (out of frame), mission specialist, removed a faulty control moment gyroscope (CMG-3) and installed a new CMG into the station's Z1 truss. The failed CMG will remain at its temporary stowage location on the station's exterior until it is returned to Earth on a later shuttle mission. The new gyroscope is one of four CMGs that are used to control the station's attitude in orbit.

  14. View of MS Williams installing the new CMG during Expedition 15/STS-118 EVA 2

    NASA Image and Video Library

    2007-08-13

    ISS015-E-22364 (13 Aug. 2007) --- Astronaut Dave Williams, STS-118 mission specialist representing the Canadian Space Agency, participates in the mission's second planned session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the 6-hour, 28-minute spacewalk, Williams and astronaut Rick Mastracchio (out of frame), mission specialist, removed a faulty control moment gyroscope (CMG-3) and installed a new CMG into the station's Z1 truss. The failed CMG will remain at its temporary stowage location on the station's exterior until it is returned to Earth on a later shuttle mission. The new gyroscope is one of four CMGs that are used to control the station's attitude in orbit.

  15. 30 CFR 206.259 - Determination of washing allowances.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Allowable maintenance expenses include: Maintenance of the wash plant; maintenance of equipment; maintenance..., or a cost equal to the depreciable investment in the wash plant multiplied by the rate of return in... depreciable fixed assets (including costs of delivery and installation of capital equipment) which are an...

  16. Solar heating and cooling system installed at RKL Controls Company, Lumberton, New Jersey

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The final results of the design and operation of a computer controlled solar heated and cooled 40,000 square foot manufacturing building, sales office, and computer control center/display room are summarized. The system description, test data, major problems and resolutions, performance, operation and maintenance manual, equipment manufacturers' literature, and as-built drawings are presented. The solar system is composed of 6,000 square feet of flat plate collectors, external above ground storage subsystem, controls, absorption chiller, heat recovery, and a cooling tower.

  17. Rethinking multifamily resets and cutouts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jablonski, F.

    In multifamily applications, where heating bills often run into thousands of dollars, reset-cutout combinations appear to be very attractive retrofits because, when properly operated, they meet owners' needs for very quick returns on energy saving investments. Unfortunately, the author's observation of resets and cutouts operating under conditions the author typically found in residential multifamily buildings indicates that adjustable controls, such as most resets and cutouts, will often be defeated through poor installation and maladjustment. This appears to be true even when programs incorporate mechanisms aimed at training building operators to manage the controls correctly, and reinforce that training with writtenmore » instructions and periodic reminders. Despite the massive and frequently reinforced education effort for control operators, his post-installation site visits revealed that resets and cutouts were still routinely defeated. Out of curiosity, he conducted a survey of cutout controls in spring 1990. The author has found that 19 of 19 cutout controls surveyed, all of which had been installed under the enhanced program, were rendered functionally inoperable because they were turned off or set far too high. Because this preliminary survey showed such poor results, additional research is now underway to assess the maintenance or disablement of these adjustable resets and cutouts.« less

  18. Solar Energy Installers Curriculum Guide. Final Report, September 18, 1980-August 15, 1981.

    ERIC Educational Resources Information Center

    Seaman, George B., Sr.

    This publication is a curriculum guide for the installation of solar equipment. It is divided into the three major areas of general knowledge, technical design, and installation/maintenance. Associated is a list of relevant and prerequisite competencies identified as appropriate toward student interest groups of technician, installer,…

  19. 47 CFR 68.213 - Installation of other than “fully protected” non-system simple customer premises wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... only to “unprotected” premises wiring used with simple installations of wiring for up to four line residential and business telephone service. More complex installations of wiring for multiple line services... requirements, for installation and maintenance of wiring on the subscriber's side of the demarcation point...

  20. Maintenance Resources by Building Use for U.S. Army Installations. Volume 2. Appendices A through H

    DTIC Science & Technology

    1991-05-01

    Installations, Volume II: Appendices A Through H RDTE dated 1980REIMB 1984 6 . AUTHOR(S) Edgar S. Neely and Robert D. Neathammer 7 . PERFORML’JG...Recurring Maintenance Factor 1.10 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0 .000 .000 .000 .000 .000 .050 .190 .240 .300 .280...Special Condition Multiplier 1.00 Annual Recurring Maintenance Factor .79 MRT For Major Cost Tasks and Replacement Tasks Decade 1 2 3 4 6 7 8 9 10 0

  1. 7 CFR 1470.24 - Payments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant associated with planning, design, materials, installation, labor, management, maintenance, or..., construction, or maintenance of animal waste storage or treatment facilities or associated waste transport or...

  2. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...

  3. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... valid hour of data. (2) You must have valid data from at least 90 percent of the hours during which the... three of four equally spaced data values from that hour from a continuous monitoring system (CMS) that... that period using only average values that are based on valid data (i.e., not from out-of-control...

  4. The Cost Effectiveness of West Coast Distributed Simulation Training for the Pacific Fleet

    DTIC Science & Technology

    2001-12-01

    TITLE AND SUBTITLE: The Cost Effectiveness of Distributed Simulation Training for Third Fleet 6. AUTHOR( S ) Shearon, Blane T. 5. FUNDING NUMBERS... ACCOUNTING FOR FIXED INFRASTRUCTURE COSTS ..................67 1. Installation of PACNORWEST MUTTS Van.................................67 2...ASTAC) training, Amphibious Boat Controller training, and other classes. To appropriately account for the TACDEW maintenance costs associated with

  5. Heat Recovery Ventilation for Housing: Air-to-Air Heat Exchangers.

    ERIC Educational Resources Information Center

    Corbett, Robert J.; Miller, Barbara

    The air-to-air heat exchanger (a fan powered ventilation device that recovers heat from stale outgoing air) is explained in this six-part publication. Topic areas addressed are: (1) the nature of air-to-air heat exchangers and how they work; (2) choosing and sizing the system; (3) installation, control, and maintenance of the system; (4) heat…

  6. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the control device according to the requirements in paragraphs (a)(1) through (4) of this section. (1... appropriate for the applicable limitation) at 15 percent oxygen or the equivalent CO2 concentration. (b) If... gas equivalent to 10 percent or more of the gross heat input on an annual basis, you must monitor and...

  7. Cassidy during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009322 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  8. 29 CFR 500.105 - DOT standards adopted by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Act directly concerned with the management, maintenance, operation, or driving of motor vehicles..., agents, drivers, representatives and employees directly concerned with the installation and maintenance...) Inspection and maintenance of motor vehicles (Source: 49 CFR 398.7). Every person shall systematically...

  9. Application of a Resilience Framework to Military Installations: A Methodology for Energy Resilience Business Case Decisions

    DTIC Science & Technology

    2016-10-04

    analysis (due to site-level evaluations), but could be added in the future, include: wind turbines (the installations we visited were not interested due...procurement, operation, maintenance , testing, and fueling of the generators, detailed inventory and cost data is difficult to obtain. The DPW is often...understaffed, leading to uneven testing and maintenance of the equipment despite their best efforts. The reliability of these generators is typically

  10. Supplemental Analysis Survey of C&P Telephone Inside Wiring.

    DTIC Science & Technology

    1986-10-01

    telephone company facilities in 1984. In 1985, among other actions favorable to deregulation and detariffing of inside wiring, the FCC proposed to detariff ...installation of inside wiring, detariff the maintenance of all inside wiring, treat all inside wiring as customer premise equipment and pass ownership...85-148, 50 Fed. let. 13991 (April 9, 1985), pToposing to detariff the installation of simple inside wiring and also to detariff the maintenance of all

  11. Advanced figure sensor operations and maintenance manual

    NASA Technical Reports Server (NTRS)

    Robertson, H. J.

    1972-01-01

    This manual contains procedures for installing, operating, and maintaining the optical figure sensor and its associated electronic controls. The optical figure sensor, a system of integrated components, comprises: (1) a phase measuring modified interferometer employing a single frequency 6328 A laser, and a Vidissector; (2) a two-axis automatic thermal compensation control mount; (3) a five degree of freedom manual adjustment stand; and (4) a control console. This instrument provides real time output data of optical figure errors for spherical mirrors, and is also capable of measuring aspherical mirrors if a null corrector is added.

  12. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  13. [Air quality control systems: heating, ventilating, and air conditioning (HVAC)].

    PubMed

    Bellucci Sessa, R; Riccio, G

    2004-01-01

    After a brief illustration of the principal layout schemes of Heating, Ventilating, and Air Conditioning (HVAC), the first part of this paper summarizes the standards, both voluntary and compulsory, regulating HVAC facilities design and installation with regard to the question of Indoor Air Quality (IAQ). The paper then examines the problem of ventilation systems maintenance and the essential hygienistic requirements in whose absence HVAC facilities may become a risk factor for people working or living in the building. Lastly, the paper deals with HVAC design strategies and methods, which aim not only to satisfy comfort and air quality requirements, but also to ensure easy and effective maintenance procedures.

  14. New concept for a general purpose subsea installation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less

  15. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  16. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  17. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  18. 14 CFR 171.323 - Fabrication and installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... must be located, constructed, and installed in accordance with best commercial engineering practices... software and/or hardware in space provided in the original equipment. (d) The mean corrective maintenance...

  19. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...

  20. STS-109 Crew Interviews - Altman

    NASA Technical Reports Server (NTRS)

    2002-01-01

    STS-109 crew Commander Scott D. Altman is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, which are all related to maintenance of the Hubble Space Telescope (HST). After the Columbia Orbiter's rendezvous with the HST, extravehicular activities (EVA) will be focused on several important tasks which include: (1) installing the Advanced Camera for Surveys; (2) installing a cooling system on NICMOS (Near Infrared Camera Multi-Object Spectrometer); (3) repairing the reaction wheel assembly; (4) installing additional solar arrays; (5) augmenting the power control unit; (6) working on the HST's gyros. The reaction wheel assembly task, a late addition to the mission, may necessitate the abandonment of one or more of the other tasks, such as the gyro work.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perrin, Tess E.; Davis, Robert G.; Wilkerson, Andrea M.

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitivemore » advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.« less

  2. Polymer concrete overlay on Beulah Road Bridge : interim report no. 1--installation and initial condition of overlay.

    DOT National Transportation Integrated Search

    1982-01-01

    The installation of a thin polymer concrete overlay on the Beulah Road bridge demonstrates that an overlay of low permeability and high skid resistance can be successfully installed by maintenance forces with a minimum of disruption to traffic, appro...

  3. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  4. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  5. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  6. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  7. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  8. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  9. Void Fraction Instrument operation and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  10. Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.

    1981-01-01

    The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.

  11. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  12. 7 CFR Appendix B to Part 4280 - Technical Reports for Projects With Total Eligible Project Costs Greater Than $200,000

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and maintenance of the renewable energy system or energy efficiency improvement will operate or..., installation, and maintenance. Authoritative evidence that project team service providers have the necessary... and shakedown, warranties, insurance, financing, professional services, and operations and maintenance...

  13. Influence of forces acting on side of machine on precision machining of large diameter holes

    NASA Astrophysics Data System (ADS)

    Fedorenko, M. A.; Bondarenko, J. A.; Sanina, T. M.

    2018-03-01

    One of the most important factors that increase efficiency, durability and reliability of rotating units is precision installation, preventive maintenance work, timely replacing of a failed or worn components and assemblies. These works should be carried out in the operation of the equipment, as the downtime in many cases leads to large financial losses. Stop of one unit of an industrial enterprise can interrupt the technological chain of production, resulting in a possible stop of the entire equipment. Improving the efficiency and optimization of the repair process increases accuracy of installation work when installing equipment, conducting restoration under operating conditions relevant for enterprises of different industries because it eliminates dismantling the equipment, sending it to maintenance, the expectation of equipment return, the new installation with the required quality and accuracy of repair.

  14. Installation guidelines for solar heating system, single-family residence at New Castle, Pennsylvania

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar heating system installer guidelines are presented for each subsystem. This single family residential heating system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: (1) liquid cooled flat plate collectors; (2) water storage tank; (3) passive solar-fired domestic water preheater; (4) electric hot water heater; (5) heat pump with electric backup; (6) solar hot water coil unit; (7) tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; (8) control system; and (9) air-cooled heat purge unit. Information is provided on the operating procedures, controls, caution requirements, and routine and schedule maintenance in the form of written descriptions, schematics, detail drawings, pictures, and manufacturer's component data.

  15. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009342 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  16. Cassidy during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009315 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  17. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009312 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  18. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009317 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  19. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009329 (27 July 2009) --- Astronauts Christopher Cassidy and Tom Marshburn (partially out of frame at left), both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  20. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009323 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  1. Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009303 (27 July 2009) --- Astronaut Tom Marshburn, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and astronaut Christopher Cassidy (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  2. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009363 (27 July 2009) --- Astronauts Tom Marshburn (foreground) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  3. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009372 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  4. iss020e025085

    NASA Image and Video Library

    2009-07-27

    ISS020-E-025085 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of ?get ahead? tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  5. Cassidy during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009248 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  6. Cassidy during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009347 (27 July 2009) --- Astronaut Christopher Cassidy, STS-127 mission specialist, participates in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Cassidy and astronaut Tom Marshburn (out of frame), mission specialist, secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  7. Cassidy and Marshburn during EVA-5

    NASA Image and Video Library

    2009-07-27

    S127-E-009371 (27 July 2009) --- Astronauts Tom Marshburn (left) and Christopher Cassidy, both STS-127 mission specialists, participate in the mission's fifth and final session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the four-hour, 54-minute spacewalk, Marshburn and Cassidy secured multi-layer insulation around the Special Purpose Dexterous Manipulator known as Dextre, split out power channels for two space station Control Moment Gyroscopes, installed video cameras on the front and back of the new Japanese Exposed Facility and performed a number of “get ahead” tasks, including tying down some cables and installing handrails and a portable foot restraint to aid future spacewalkers.

  8. Laboratory services series: a master-slave manipulator maintenance program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R. G.; Hicks, R. E.; Wicker, C. D.

    1976-12-01

    The volume of master slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and development of precise procedures for accomplishing the maintenance of 287 installed units. A very satisfactory computer programmed maintenance system has been established at the Laboratory to provide an economical approach to preventive maintenance.

  9. 46 CFR 181.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  10. NREL Supports Innovative Offshore Wind Energy Projects | News | NREL

    Science.gov Websites

    installation, operation, and maintenance methods for wind turbines located far from shore. Fishermen's Energy will also use the twisted-jacket foundation for the five 5-MW turbines it plans to install 3 miles off about offshore wind and investigate interactions between turbines. Principle Power will install five 6

  11. 30 CFR 28.3 - Installation, use, and maintenance of approved fuses.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES General Provisions § 28.3 Installation, use, and... standards prescribed for short-circuit protective devices for trailing cables in Parts 75 and 77, Subchapter...

  12. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  13. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  14. The NASA Langley Research Center 0.3-meter transonic cryogenic tunnel T-P/Re-M controller manual

    NASA Technical Reports Server (NTRS)

    Balakrishna, S.; Kilgore, W. Allen

    1989-01-01

    A new microcomputer based controller for the 0.3-m Transonic Cryogenic Tunnel (TCT) has been commissioned in 1988 and has reliably operated for more than a year. The tunnel stagnation pressure, gas stagnation temperature, tunnel wall structural temperature and flow Mach number are precisely controlled by the new controller in a stable manner. The tunnel control hardware, software, and the flow chart to assist in calibration of the sensors, actuators, and the controller real time functions are described. The software installation details are also presented. The report serves as the maintenance and trouble shooting manual for the 0.3-m TCT controller.

  15. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  16. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  17. 40 CFR 63.4364 - What are the requirements for CPMS installation, operation, and maintenance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... being monitored in degrees Celsius, or ±1 °Celsius, whichever is greater. The thermocouple or... is greater. The thermocouple or temperature sensor must be installed in the vent stream at the...

  18. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  19. 32 CFR 552.31 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., industrial facilities, cemeteries, etc., generally will be designated as an installation where located... than for the production of materiel, munitions, or supplies. (f) Industrial installation. Any unit of... leased to the United States, substantially equipped with production utilities and maintenance machinery...

  20. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  1. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  2. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  3. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Pollutants for Coke Ovens: Pushing, Quenching, and Battery Stacks Continuous Compliance Requirements § 63... each by-product coke oven battery, you must install, operate, and maintain a COMS to measure and record...

  4. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  5. Aircraft Flight Safety: A Bibliography. (La Securite en Vol: Une Bibliographie)

    DTIC Science & Technology

    1993-12-01

    having been installed 93A27135 with the wrong bolts during maintenance. An DRURY , COLIN G. (New York State Univ., analysis of the complex events...accident rates. The REJMAN, MICHAEL H.; SYMONDS, COLIN J.; 0 conclusion made is that, Judgement Training has SHEPHERD, ERIC W. (City of London Polytech...from training 0 software to controlled dynamic simulations 93N19702 conducted with mockups, tooling, and subjects in SYMONDS, COLIN J.; REJMAN

  6. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  7. Operation and maintenance cost data for residential photovoltaic modules/panels

    NASA Technical Reports Server (NTRS)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  8. Master--slave manipulators and remote maintenance at the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jenness, R.G.; Wicker, C.D.

    1975-01-01

    The volume of master-slave manipulator maintenance at Oak Ridge National Laboratory has necessitated the establishment of a repair facility and the organization of a specially trained group of craftsmen. Emphasis on cell containment requires the use of manipulator boots and the development of precise procedures for accomplishing the maintenance of 283 installed units. To provide the most economical type of preventive maintenance, a very satisfactory computer- programmed maintenance system has been established at the Laboratory. (auth)

  9. Aircraft Electronics Maintenance Training Simulator. Curriculum Outlines.

    ERIC Educational Resources Information Center

    Blackhawk Technical Coll., Janesville, WI.

    Instructional materials are provided for nine courses in an aircraft electronics maintenance training program. Courses are as follows: aviation basic electricity, direct current and alternating current electronics, basic avionic installations, analog electronics, digital electronics, microcomputer electronics, radio communications, aircraft…

  10. Partial-depth repair of jointed PCC pavements : cast-in-place and precast procedures.

    DOT National Transportation Integrated Search

    1977-01-01

    The installation of durable patches on jointed portland cement concrete pavement using several types of cast-in-place concrete, is described. The recommended procedures for pavement preparation and patch installation are given, and additional mainten...

  11. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011590 (24 June 2013) --- Russian cosmonauts Alexander Misurkin (left) and Fyodor Yurchikhin, both Expedition 36 flight engineers, participate in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Yurchikhin replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  12. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011593 (24 June 2013) --- Russian cosmonauts Alexander Misurkin (left) and Fyodor Yurchikhin, both Expedition 36 flight engineers, participate in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Yurchikhin replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.

  13. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  14. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  15. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Maintenance Program. The list is not all-inclusive. 1. Cleaning and repairing ditches and culverts. 2... additional culverts to prevent roadway and adjoining property damage. 4. Repairing, replacing or installing...

  16. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  17. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  18. 46 CFR 111.01-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS General § 111.01-1 General. (a) Electric installations on vessels must ensure: (1) Maintenance of services... persons, and the vessel from electrical hazards. (3) Maintenance of system integrity through compliance...

  19. Long-Term Structural Performance Monitoring of Bridges : Hardware Maintenance and, Long-term Data Collection/Analysis

    DOT National Transportation Integrated Search

    2011-06-01

    In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...

  20. Long-term structural performance monitoring of bridges : hardware maintenance and, long-term data collection/analysis.

    DOT National Transportation Integrated Search

    2011-06-01

    In this project a description of the maintenance of the sensor monitoring systems installed on three California : highway bridges is presented. The monitoring systems consist of accelerometers, strain gauges, pressure sensors, : and displacement sens...

  1. Carpeting/Flooring: Revitalizing Carpets.

    ERIC Educational Resources Information Center

    Woolford, Alison; Hill, Michael

    2003-01-01

    With properly specified fiber and a comprehensive maintenance program, school carpets can retain their appearance longer. Discusses carpet characteristics; proper carpet installation; effective preventive-maintenance programs (keep outside areas clean, use soil barriers, protect desk areas, maintain HVAC systems, and specify eating, drinking, and…

  2. Design and installation package for the Sunmat Flat Plate solar collector

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The information used in evaluating the design of a liquid flat plate solar collector is reported. Included in this package are subsystem performance specification, installation, operation and maintenance manuals, collector sizing guides, and detailed drawings of the single-glazed collector.

  3. An evaluation of retrofit engineering control interventions to reduce perchloroethylene exposures in commercial dry-cleaning shops.

    PubMed

    Earnest, G Scott; Ewers, Lynda M; Ruder, Avima M; Petersen, Martin R; Kovein, Ronald J

    2002-02-01

    Real-time monitoring was used to evaluate the ability of engineering control devices retrofitted on two existing dry-cleaning machines to reduce worker exposures to perchloroethylene. In one dry-cleaning shop, a refrigerated condenser was installed on a machine that had a water-cooled condenser to reduce the air temperature, improve vapor recovery, and lower exposures. In a second shop, a carbon adsorber was retrofitted on a machine to adsorb residual perchloroethylene not collected by the existing refrigerated condenser to improve vapor recovery and reduce exposures. Both controls were successful at reducing the perchloroethylene exposures of the dry-cleaning machine operator. Real-time monitoring was performed to evaluate how the engineering controls affected exposures during loading and unloading the dry-cleaning machine, a task generally considered to account for the highest exposures. The real-time monitoring showed that dramatic reductions occurred in exposures during loading and unloading of the dry-cleaning machine due to the engineering controls. Peak operator exposures during loading and unloading were reduced by 60 percent in the shop that had a refrigerated condenser installed on the dry-cleaning machine and 92 percent in the shop that had a carbon adsorber installed. Although loading and unloading exposures were dramatically reduced, drops in full-shift time-weighted average (TWA) exposures were less dramatic. TWA exposures to perchloroethylene, as measured by conventional air sampling, showed smaller reductions in operator exposures of 28 percent or less. Differences between exposure results from real-time and conventional air sampling very likely resulted from other uncontrolled sources of exposure, differences in shop general ventilation before and after the control was installed, relatively small sample sizes, and experimental variability inherent in field research. Although there were some difficulties and complications with installation and maintenance of the engineering controls, this study showed that retrofitting engineering controls may be a feasible option for some dry-cleaning shop owners to reduce worker exposures to perchloroethylene. By installing retrofit controls, a dry-cleaning facility can reduce exposures, in some cases dramatically, and bring operators into compliance with the Occupational Safety and Health Administration (OSHA) peak exposure limit of 300 ppm. Retrofit engineering controls are also likely to enable many dry-cleaning workers to lower their overall personal TWA exposures to perchloroethylene.

  4. The State of the Art. Bridge Protective Systems and Devices.

    DTIC Science & Technology

    1978-10-01

    Chlorine io more commonly found In the marine envirorment while carbon dioxide and sulfur oxide are common Industrial con- taninants. The rate of all of...sulfur, and carbon dioxide which form acid films; and the composition of the metal. Proper maintenance can do little as far as controlling the...installations. 50PP I 8 4 ol - - - -~ ~ a-.’ PON -- Chemical corrosion resul’ from the direct attack on stool by acids or diluted acids. Chlorine, carbon

  5. STS-88 Mission Highlights Resources Tape. Tape B

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The STS-88 flight crew, Commander Robert D. Cabana, Pilot Frederick W. Sturckow, and Mission Specialists Nancy J. Currie, James H. Newman, Jerry L. Ross, and Sergei Krikalev present a video overview of their space flight. Tape two of three includes the installation of an S-Band to help monitor the UNITY Connecting Module, the opening of UNITY's hatch, the opening of the main compartment hatch to ZARYA Control Module, and the repair of the inflight maintenance system.

  6. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  7. 32 CFR 260.6 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... period of time subject to suspension or termination upon failure to comply with agreed-upon terms. It... sanitation and the maintenance of vending facilities and vending machines in an orderly condition at all times, and the installation, maintenance, repair, replacement, servicing, and removal of vending...

  8. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  9. A New Remote Communications Link to Reduce Residential PV Solar Costs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, Randy; Sugiyama, Rod

    Monitoring of PV/DER site production is expensive to install and unreliable. Among third party systems providers, lost communications links are a growing concern. Nearly 20% of links are failing, provisioning is complex, recovery is expensive, production data is lost, and access is fragmented. FleetLink is a new concept in DER system communications, purpose built for lowering the cost of maintaining active contact with residential end user sites and ensuring that production data is reliably available to third party systems providers. Systems providers require accurate, secure system monitoring and reporting of production data and system faults while driving down overall costsmore » to compete effectively. This plug and play, independently operating communications solution lowers the cost of fleet contact from typically .08 dollars-$.12/W down to .02 dollars -.03/W including installation and maintenance expenses. FleetLink establishes a breakthrough in simplicity that facilitates rapid expansion of residential solar by reducing initial capital outlay and lowering installation labor time and skill levels. The solution also facilitates higher DER installation growth rates by driving down maintenance costs and eliminating communications trouble calls. This is accomplished by the FleetLink’s unique network technology that enables dynamic network configuration for fast changes, and active, self-healing DER site contact for uptime assurance. Using an open source network framework with proprietary, application specific enhancements, FleetLink independently manages connectivity, security, recovery, grid control communications, and fleet expansion while presenting a compliant SunSpec interface to the third party operations centers. The net system cost savings of at least .05 dollars/W supports the SunShot cost goals and the flexibility and scalability of the solution accelerates the velocity and ubiquitous adoption of solar.« less

  10. 23 CFR 660.519 - Missile installations and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... extraordinary maintenance as necessary to keep the roads serviceable and maintain adequate supporting records of... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...) Restoration under the contract. (1) The highway agency having jurisdiction over the road shall take...

  11. Method and apparatus for energy efficient self-aeration in chemical, biochemical, and wastewater treatment processes

    DOEpatents

    Gao, Johnway [Richland, WA; Skeen, Rodney S [Pendleton, OR

    2002-05-28

    The present invention is a pulse spilling self-aerator (PSSA) that has the potential to greatly lower the installation, operation, and maintenance cost associated with aerating and mixing aqueous solutions. Currently, large quantities of low-pressure air are required in aeration systems to support many biochemical production processes and wastewater treatment plants. Oxygen is traditionally supplied and mixed by a compressor or blower and a mechanical agitator. These systems have high-energy requirements and high installation and maintenance costs. The PSSA provides a mixing and aeration capability that can increase operational efficiency and reduce overall cost.

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Easton, C. R.

    The objectives of this program are to establish a heliostat design with the associated manufacturing, assembly, installation and maintenance approaches that will: (1) yield a significant reduction of capital and operating costs; (2) meet performance specifications for large collector subsystems; and (3) can be produced and deployed throughout the southwestern United States. In addition, cost plans and schedules to develop, fabricate, and operate the heliostat are to be developed. This volume presents the collector design, including trade study and test results, and the manufacturing, installation and checkout, and operations and maintenance concepts. Also, a discussion of specification verification and optimizationmore » is included. (WHK)« less

  13. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less

  14. El Toro Library Solar Heating and Cooling Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less

  15. 40 CFR 63.7331 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air... baghouse applied to pushing emissions, you must install, operate, and maintain each bag leak detection...

  16. 26 CFR 1.954-4 - Foreign base company services income.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... substantial assistance when taken together or in combination with other assistance furnished by a related... A is paid by related corporation M for the installation and maintenance of industrial machines which... manufactures an industrial machine which requires specialized installation. Corporation M sells the machines...

  17. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...

  18. Optimization of Installation, Operation and Maintenance at Offshore Wind Projects in the U.S.: Review and Modeling of Existing and Emerging Approaches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baldock, Nick; Sevilla, Fernando; Redfern, Robin

    The United States Department of Energy (DOE) awarded a grant to GL Garrad Hassan (GL GH) to investigate the logistics, opportunities, and costs associated with existing and emerging installation and operation and maintenance (O&M) activities at offshore wind projects as part of the DOE’s program to reduce barriers facing offshore wind project development in the United States (U.S.). This report (the Report) forms part of Subtopic 5.3 “Optimized Installation, Operation and Maintenance Strategies Study” which in turn is part of the “Removing Market Barriers in U.S. Offshore Wind” set of projects for the DOE. The purpose of Subtopic 5.3 ismore » to aid and facilitate informed decision-making regarding installation and O&M during the development, installation, and operation of offshore wind projects in order to increase efficiency and reduce the levelized cost of energy (LCoE). Given the large area of U.S. territorial waters, the generally higher mean wind speeds offshore, and the proximity to the coast of many large U.S. cities, offshore wind power has the potential to become a significant contributor of energy to U.S. markets. However, for the U.S. to ensure that the development of offshore wind energy projects is carried out in an efficient and cost-effective manner, it is important to be cognizant of the current and emerging practices in both the domestic and international offshore wind energy industries. The U.S. can harness the experience gained globally and combine this with the skills and assets of an already sizeable onshore wind industry, as well as the resources of a mature offshore oil and gas industry, to develop a strong offshore wind sector. The work detailed in this report is aimed at assisting with that learning curve, particularly in terms of offshore specific installation and O&M activities. This Report and the Installation and O&M LCoE Analysis Tool, which were developed together by GL GH as part of this study, allow readers to identify, model and probe the economic merits and sensitivities of various approaches to construction and O&M practices, using illustrative offshore projects across a wide range of alternative offshore development areas located in U.S. waters. The intention is to assist decision-makers in clearly understanding the relative economic benefits of both conventional and novel construction installation methodologies and maintenance techniques within the critical parameters of a Project’s LCoE.« less

  19. System administrator`s guide to CDPS. Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Didier, B.T.; Portwood, M.H.

    The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less

  20. Project SAGE: solar assisted gas energy. Final report and executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Phase III basic objective was establishment of a technical and economic baseline for proper assessment of the practical potential of solar water heating for apartments. Plans can then be formulated to improve SAGE technical design and performance; reduce SAGE costs; refine SAGE market assessment; and identify policies to encourage the use of SAGE. Two SAGE water heating systems were installed and tested. One system was retrofit onto an existing apartment building; the other was installed in a new apartment building. Each installation required approximately 1000 square feet of collector area tilted to an angle of 37/sup 0/ from themore » horizontal, and each was designed to supply about 70 percent of the energy for heating water for approximately 32 to 40 units of a typical two-story apartment complex in Southern California. Actual contruction costs were carefully compiled, and both installations were equipped with performance monitoring equipment. In addition, the operating and maintenance requirements of each installation was evaluated by gas company maintenance engineers. Upon completion of the installation analysis, the SAGE installation cost was further refined by obtaining firm SAGE construction bids from two plumbing contractors in Southern California. Market penetration was assessed by developing a computer simulation program using the technical and economic analysis from the installation experience. Also, the project examined the public policies required to encourage SAGE and other solar energy options. Results are presented and discussed. (WHK)« less

  1. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011479 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  2. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011459 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  3. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011481 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  4. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011441 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  5. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011747 (24 June 2013) --- Russian cosmonaut Alexander Misurkin (bottom center), Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  6. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011642 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  7. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011440 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.

  8. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011480 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  9. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011745 (24 June 2013) --- Russian cosmonaut Alexander Misurkin (bottom center), Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  10. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011598 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.

  11. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011477 (24 June 2013) --- Russian cosmonaut Fyodor Yurchikhin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Yurchikhin and Russian cosmonaut Alexander Misurkin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  12. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011439 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed one new one.

  13. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011640 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  14. Russian EVA 33

    NASA Image and Video Library

    2013-06-24

    ISS036-E-011608 (24 June 2013) --- Russian cosmonaut Alexander Misurkin, Expedition 36 flight engineer, participates in a session of extravehicular activity (EVA) as work continues on the International Space Station. During the six-hour, 34-minute spacewalk, Misurkin and Russian cosmonaut Fyodor Yurchikhin (out of frame), Expedition 36 flight engineer, replaced an aging fluid flow control panel on the station's Zarya module as preventative maintenance on the cooling system for the Russian segment of the station. They also installed clamps for future power cables as an early step toward swapping the Pirs airlock with a new multipurpose laboratory module. The Russian Federal Space Agency plans to launch a combination research facility, airlock and docking port late this year on a Proton rocket. Yurchikhin and Misurkin also retrieved two science experiments and installed a new one.

  15. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., operate, and maintain a CEMS to monitor CO and either O2 or CO2 according to the requirements in... program must be part of the maintenance plan for the engine. (j) If you own or operate a stationary SI...

  16. Carpentry and Finishing Procedures. Building Maintenance. Module II. Instructor's Guide.

    ERIC Educational Resources Information Center

    Hawk, Sam; Brunk, Art

    This curriculum guide, keyed to the building maintenance competency profile developed by industry and education professionals, provides three units on carpentry and finishing procedures. The first unit, Exterior Carpentry, contains the following lessons: carpentry safety procedures, ladder and scaffolding safety, door installation/repair,…

  17. 40 CFR 63.9525 - What are the installation, operation, and maintenance requirements for my weight measurement device?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and maintenance requirements for my weight measurement device? 63.9525 Section 63.9525 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for...

  18. Aviation Maintenance Technology. General. G104 Technical Mechanics. Instructor Material.

    ERIC Educational Resources Information Center

    Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    These instructor materials for an aviation maintenance technology course contain five instructional modules. The modules cover the following topics: performing aircraft ground handling and servicing, using hand and power tools and precision measuring instruments, identifying and selecting aircraft hardware, fabricating and installing rigid and…

  19. History of the U.S. Army Artillery and Missile School. Volume 4. 1958-1967

    DTIC Science & Technology

    1967-01-01

    Graduates 367 155 Failures 10 1 Adrin Attrition e 0 Tu rnbacka 0 0 II 661 Vr 4 , • L4’,, i, • = i ’ .... • . .. . ., COB PORAL HANDLING EQUIPMENT...knowledge to assemble, install, adjust and perform organi- zational maintenance of on-missile electronic guidance control corn - ponents and systems...mechanic in an artillery unit (minimum experience may be waived for reserve corn - ponent personnel). Qualified as a driver and hold military vehicle

  20. Proceedings of the Tri-Service Conference on Corrosion Held in Atlantic City, New Jersey on 17-19 October 1989

    DTIC Science & Technology

    1989-10-19

    installation. 4. Corrosion inhibiting compounds need to be applied in the final assealbly of models to all corrosion prone areas of the structure, e.g...Figure 12 shows an example of poor surface treatment of a previously repaired stringer area. Application of a corrosion inhibiting compound may have... compounds and a good corrosion control maintenance program. REFERENCE U. G. Goranson and M. Miller, "Aging Fleet - Aging Fleet Evaluation Program

  1. DCS (Defense Communications System) Technical Control Engineering Criteria. Revision 1

    DTIC Science & Technology

    1981-05-01

    Switched Network 5-9-14 5.9.6(g) Application of Principle of Time-Slot Interchange for Alt-Routing 5-9-15 5.9.6(h) Digital Interface (typical...is an approximate chart and does not take into account signal degradations which may be caused by frame cross-connects, patch jacks, or splices...Manual, TSEC/KG-30/30A/33A/34/34A Volume I - Description, Installation, and Principles of Operation KAM-238/TSEC Maintenance Maliual TSEC/KG-30/30A/33/33A

  2. Conversion of Low Quality Waste Heat to Electric Power with Small-Scale Organic Rankine Cycle (ORC) Engine/Generator Technology

    DTIC Science & Technology

    2016-06-01

    Allan Robichaux, DPW PWD GTMO and the management and staff of the GTMO on site contractor , Centerra. Page Intentionally Left Blank ii Table of...operations and maintenance contractor to ensure that data transfers are completed as required. Figure 4 shows the location of the ORC installation on MUSE...this issue with telephone support from CRM’s controls contractor (Winn-Marion, W-M); however, the problem remained unresolved as of Sept. 1 when

  3. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Instrumentation Automation for Concrete Structures. Report 2. Automation Hardware and Retrofitting Techniques.

    DTIC Science & Technology

    1987-06-01

    head. The electrical connection points are embedded in silicone sealing compound. The photo elements are varnished; the mirrors are chromium-plated metal...control of barrage walls and retaining dams using reversible pendulums, the suspension points of which are located in boreholes deep under the structure in...rock layers that can very probably be considered as invariable relation points . A measuring device installed in the foundation area of a barrage wall

  4. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...

  5. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...

  6. 40 CFR 63.11180 - What definitions do I need to know?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...

  7. 40 CFR 63.11180 - What definitions do I need to know?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...

  8. 40 CFR 63.11180 - What definitions do I need to know?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...

  9. 40 CFR 63.11180 - What definitions do I need to know?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...

  10. 40 CFR 63.11180 - What definitions do I need to know?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installation, to pavements, or to curbs. Cleaning material means a solvent used to remove contaminants and... portable buildings at the site of installation, to pavements, or to curbs. Facility maintenance also... designed and operated between 0.1 and 10 pounds per square inch gauge (psig) air atomizing pressure...

  11. 29 CFR 570.67 - Occupations in roofing operations and on or about a roof (Order 16).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... proximity to a roof, including carpentry and metal work, alterations, additions, maintenance and repair... or metal), including roof trusses or joists; gutter and downspout work; the installation and... work performed in connection with the installation of roofs, including related metal work such as...

  12. Evaluation of fire-safety programs that use 10-year smoke alarms.

    PubMed

    Jackson, Mark; Wilson, Jonathan; Akoto, Judith; Dixon, Sherry; Jacobs, David E; Ballesteros, Michael F

    2010-10-01

    The Centers for Disease Control and Prevention began funding a Smoke Alarm Installation and Fire Safety Education (SAIFE) program in 1998. This program involves the installation of lithium-powered "10-year" smoke alarms in homes at high risk for fires and injuries. This study aimed to (1) determine among original SAIFE homes if the lithium-powered alarms were still present and functional 8-10 years after installation and (2) understand factors related to smoke alarm presence and functionality. Data on a total of 384 homes and 601 smoke alarms in five states were collected and analyzed. Only one-third of alarms were still functional; 37% of installed alarms were missing; and 30% of alarms were present, but not functioning. Alarms were less likely to be functioning if they were installed in the kitchen and if homes had a different resident at follow-up. Of the 351 alarms that were present and had a battery at the time of the evaluation, only 21% contained lithium-powered batteries. Of these, 78% were still functioning. Programs that install lithium-powered alarms should use units that have sealed-in batteries and "hush" buttons. Additionally, education should be given on smoke alarm maintenance that includes a message that batteries in these alarms should not be replaced. Lithium-powered smoke alarms should last up to 10 years if maintained properly.

  13. High Temperature Superconducting Bearings for Lunar Telescope Mounts

    NASA Technical Reports Server (NTRS)

    Lamb, Mark; BuiMa, Ki; Cooley, Rodger; Mackey, Daniel; Meng, Ruling; Chu, Ching Wu; Chu, Wei Kan; Chen, Peter C.; Wilson, Thomas

    1995-01-01

    A telescope to be installed on the lunar surface in the near future must work in a cold and dusty vacuum environment for long periods without on site human maintenance. To track stars, the drive mechanism must be capable of exceedingly fine steps and repeatability. Further, the use of lightweight telescopes for obvious economic benefits burdens the requirement for stable support and rotation. Conventional contact bearings and gear drives have numerous failure modes under such a restrictive and harsh environment. However, hybrid superconducting magnetic bearings (HSMB) fit in naturally. These bearings are stable, light, passive, and essentially frictionless, allowing high precision electronic positioning control. By passive levitation, the HSMB does not wear out and requires neither maintenance nor power. A prototype illustrating the feasibility of this application is presented.

  14. A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

  15. Primary Mirror Figure Maintenance of the Hobby-Eberly Telescope using the Segment Alignment Maintenance System

    NASA Technical Reports Server (NTRS)

    Rakoczy, John; Hall, Drew; Howard, Ricky; Ly, William; Weir, John; Montgomery, Edward; Brantley, Lott W. (Technical Monitor)

    2002-01-01

    The Segment Alignment Maintenance System (SAMs) was installed on McDonald Observatory's Hobby-Eberly Telescope (HET) in August 2001. The SAMs became fully operational in October 2001. The SAMs uses a system of 480 inductive edge sensors to correct misalignments of the HET's 91 primary mirror segments when the segments are perturbed from their aligned reference positions. A special observer estimated and corrects for the global radius of curvature (GroC) mode, a mode unobservable by the edge sensors. The SAMs edge sensor system and (GroC) estimator are able to maintain HET's primary figure for much longer durations than previously had been observed. Telescope image quality has improved, and the amount of overhead time required from primary mirror alignment has been reduced. This paper gives a functional description of the SAMs control system and presents performance verification data. This paper also describes how the SAMs has improved the operational efficiency of the HET.

  16. 78 FR 34605 - Airworthiness Directives; CFM International S.A. Turbofan Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-10

    ... with a handcranking pad ``oil dynamic seal'' assembly. This proposed AD was prompted by 42 events of... of the pad cover for maintenance until installation of a handcranking pad oil dynamic seal assembly... maintenance. Introduction of a handcranking pad oil dynamic seal is available as an optional terminating...

  17. Language Maintenance at a Distance: The Daily Russian "Vitamin."

    ERIC Educational Resources Information Center

    Valentine, Susan M.; Supinski, Stanley B.; Sutherland, Richard L.

    This study addressed how to maintain "use or lose" language skills among Department of Defense linguists. The study, which involved over 300 linguists at 61 installations worldwide, supported the Air Force strategy of global engagement by regularly providing pedagogically sound language maintenance materials in small doses and…

  18. Developing a Predictive Model for Facility Repair Costs on United States Air Force Installations

    DTIC Science & Technology

    2011-06-01

    repair activities at different times ( Durango & Madanat, 2002). Christian and Pandeya (1997) define maintenance as “the effort to keep a device or...Washington DC: Secretary of the Air Force, Financial Management. Durango , P. L., & Madanat, S. M. (2002). Optimal maintenance and repair policies in

  19. 40 CFR 142.307 - What terms and conditions must be included in a small system variance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...

  20. 14 CFR 43.3 - Persons authorized to perform maintenance, preventive maintenance, rebuilding, and alterations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... category. (h) Notwithstanding the provisions of paragraph (g) of this section, the Administrator may... Product and Process Specification issued by the Administrator; and (3) Perform any inspection required by... manufactures under a production certificate. (k) Updates of databases in installed avionics meeting the...

  1. A Scalable Software Architecture Booting and Configuring Nodes in the Whitney Commodity Computing Testbed

    NASA Technical Reports Server (NTRS)

    Fineberg, Samuel A.; Kutler, Paul (Technical Monitor)

    1997-01-01

    The Whitney project is integrating commodity off-the-shelf PC hardware and software technology to build a parallel supercomputer with hundreds to thousands of nodes. To build such a system, one must have a scalable software model, and the installation and maintenance of the system software must be completely automated. We describe the design of an architecture for booting, installing, and configuring nodes in such a system with particular consideration given to scalability and ease of maintenance. This system has been implemented on a 40-node prototype of Whitney and is to be used on the 500 processor Whitney system to be built in 1998.

  2. Vibrational impacts of hush house operation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Witten, A.J.

    1988-01-01

    United States Air Force (USAF) facilities are required to test turboprop and turbojet engines before or after maintenance or repair and prior to installation on aircraft to ensure that no problems were introduced or remain uncorrected. This requirement prevents the installation of engines in aircraft which require further maintenance. There are a number of facilities in use by USAF for conducting engine diagnostic tests. The most modern of these facilities is the hush house which is a hangar-like structure designed to isolate the noise associated with extended engine operations from the surrounding environment. One type of hush house, the T-10,more » is of particular concern because of vibrational impacts to surrounding structures induced by subaudible sound (infrasound) emitted during operation. While these facilities fulfill the design requirement of reducing audible noise, serious siting problems have been reported at several installations because of infrasound-induced vibrations. The worst of these include the abandonment of an avionics laboratory because induced vibrations interfered with this facilities function and structural damage to a concrete block maintenance facility. This paper describes a predictive method for assessing vibration-driven structural impacts. 9 refs., 2 figs.« less

  3. The importance of ships and spare parts in LCAs of offshore wind power.

    PubMed

    Arvesen, Anders; Birkeland, Christine; Hertwich, Edgar G

    2013-03-19

    We develop and assess life cycle inventories of a conceptual offshore wind farm using a hybrid life cycle assessment (LCA) methodology. Special emphasis is placed on aspects of installation, operation, and maintenance, as these stages have been given only cursory consideration in previous LCAs. The results indicate that previous studies have underestimated the impacts caused by offshore operations and (though less important) exchange of parts. Offshore installation and maintenance activities cause 28% (10 g CO(2)-Eq/kWh) of total greenhouse gas emissions and 31-45% of total impact indicator values at the most (marine eutrophication, acidification, particulates, photochemical ozone). Transport and dumping of rock in installation phase and maintenance of wind turbines in use phase are major contributory activities. Manufacturing of spare parts is responsible for 6% (2 g CO2-Eq/kWh) of greenhouse gas emissions and up to 13% of total impact indicator values (freshwater ecotoxicity). Assumptions on lifetimes, work times for offshore activities and implementation of NOx abatement on vessels are shown to have a significant influence on results. Another source of uncertainty is assumed operating mode data for vessels determining fuel consumption rates.

  4. Feasibility study of a 270V dc flat cable aircraft electrical power distributed system

    NASA Astrophysics Data System (ADS)

    Musga, M. J.; Rinehart, R. J.

    1982-01-01

    This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.

  5. Contribution to the Optimization of Strategy of Maintenance by Lean Six Sigma

    NASA Astrophysics Data System (ADS)

    Youssouf, Ayadi; Rachid, Chaib; Ion, Verzea

    The efficiency of the maintenance of the industrial systems is a major economic stake for their business concern. The main difficulties and the sources of ineffectiveness live in the choice of the actions of maintenance especially when the machine plays a vital role in the process of production. But as Algeria has embarked on major infrastructure projects in transport, housing, automobile, manufacturing industry and construction (factories, housing, highway, subway, tram, etc.) requiring new implications on maintenance strategies that meet industry requirements imposed by the exploitation. From then on and seen the importance of the maintenance on the economic market and sound impacts on the performances of the installations, methods of optimization were developed. For this purpose, to ensure the survival of businesses, be credible, contributing and competitive in the market, maintenance services must continually adapt to the progress of technical areas, technological and organizational even help maintenance managers to construct or to modify maintenance strategies, objective of this work. Our contribution in this work focuses on the optimization of maintenance for industrial systems by the use of Lean six Sigma bases. Lean Six Sigma is a method of improving the quality and profitability based on mastering statically of process and it is also a management style that based on a highly regulated organization dedicated to managing project. The method is based on five main steps summarized in the acronym (DMAIC): Define Measure, Analyze, Improve and Control. Application of the method on the maintenance processes with using maintenance methods during the five phases of the method will help to reduce costs and losses in order to strive for optimum results in terms of profit and quality.

  6. Flight-testing of the self-repairing flight control system using the F-15 highly integrated digital electronic control flight research facility

    NASA Technical Reports Server (NTRS)

    Stewart, James F.; Shuck, Thomas L.

    1990-01-01

    Flight tests conducted with the self-repairing flight control system (SRFCS) installed on the NASA F-15 highly integrated digital electronic control aircraft are described. The development leading to the current SRFCS configuration is highlighted. Key objectives of the program are outlined: (1) to flight-evaluate a control reconfiguration strategy with three types of control surface failure; (2) to evaluate a cockpit display that will inform the pilot of the maneuvering capacity of the damage aircraft; and (3) to flight-evaluate the onboard expert system maintenance diagnostics process using representative faults set to occur only under maneuvering conditions. Preliminary flight results addressing the operation of the overall system, as well as the individual technologies, are included.

  7. The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

    NASA Technical Reports Server (NTRS)

    Killian, D. A.; Menninger, F. J.; Gorman, T.; Glenn, P.

    1988-01-01

    The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

  8. Mount control system of the ASTRI SST-2M prototype for the Cherenkov Telescope Array

    NASA Astrophysics Data System (ADS)

    Antolini, Elisa; Tosti, Gino; Tanci, Claudio; Bagaglia, Marco; Canestrari, Rodolfo; Cascone, Enrico; Gambini, Giorgio; Nucciarelli, Giuliano; Pareschi, Giovanni; Scuderi, Salvo; Stringhetti, Luca; Busatta, Andrea; Giacomel, Stefano; Marchiori, Gianpietro; Manfrin, Cristiana; Marcuzzi, Enrico; Di Michele, Daniele; Grigolon, Carlo; Guarise, Paolo

    2016-08-01

    The ASTRI SST-2M telescope is an end-to-end prototype proposed for the Small Size class of Telescopes (SST) of the future Cherenkov Telescope Array (CTA). The prototype is installed in Italy at the INAF observing station located at Serra La Nave on Mount Etna (Sicily) and it was inaugurated in September 2014. This paper presents the software and hardware architecture and development of the system dedicated to the control of the mount, health, safety and monitoring systems of the ASTRI SST-2M telescope prototype. The mount control system installed on the ASTRI SST-2M telescope prototype makes use of standard and widely deployed industrial hardware and software. State of the art of the control and automation industries was selected in order to fulfill the mount related functional and safety requirements with assembly compactness, high reliability, and reduced maintenance. The software package was implemented with the Beckhoff TwinCAT version 3 environment for the software Programmable Logical Controller (PLC), while the control electronics have been chosen in order to maximize the homogeneity and the real time performance of the system. The integration with the high level controller (Telescope Control System) has been carried out by choosing the open platform communications Unified Architecture (UA) protocol, supporting rich data model while offering compatibility with the PLC platform. In this contribution we show how the ASTRI approach for the design and implementation of the mount control system has made the ASTRI SST-2M prototype a standalone intelligent machine, able to fulfill requirements and easy to be integrated in an array configuration such as the future ASTRI mini-array proposed to be installed at the southern site of the Cherenkov Telescope Array (CTA).

  9. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less

  10. 40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...

  11. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  12. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  13. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  14. 40 CFR 63.9921 - What are the installation, operation and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) For the pressure drop CPMS, you must: (i) Locate the pressure sensor(s) in or as close to a position... calibration quarterly and transducer calibration monthly. (v) Conduct calibration checks any time the sensor exceeds the manufacturer's specified maximum operating pressure range, or install a new pressure sensor...

  15. Polymer concrete overlay on the Big Swan Creek Bridge : interim report no. 1--installation and initial condition of overlay.

    DOT National Transportation Integrated Search

    1984-01-01

    The installation of a thin polymer concrete overlay on the Big Swan Creek Bridge provides further evidence that an overlay of low permeability can be soundly bonded to a concrete bridge deck by maintenance forces with a minimum of disruption to traff...

  16. Alternative Fuels Data Center

    Science.gov Websites

    equipped with EVSE is responsible for the cost of the installation, maintenance, repair, removal, or restrict the installation or use of EVSE in a homeowner's designated parking space. These entities may put reasonable restrictions on EVSE, but the policies may not significantly increase the cost of the EVSE or

  17. Alternative Fuels Data Center

    Science.gov Websites

    the installation, maintenance, repair, removal, or replacement of the EVSE. A private entity includes days of installation, and the homeowner receives consent from the private entity if the EVSE is placed in a common area. Private entities may adopt rules that restrict the placement and use of EVSE but

  18. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  19. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  20. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  1. STD Installation and Maintenance Procedures. Satellite Technology DEmonstration, Technical Report No. 0421.

    ERIC Educational Resources Information Center

    Lane, Billy D.

    The ground terminals for the Satellite Technology Demonstration were more expensive to install than was anticipated because crews forced to make numerous visits to each site. Delays were caused by delinquent deliveries and by malfunctions in some of the subsystems. Insufficient time was allowed for trouble shooting, and consequently, additional…

  2. Development of a Navy Job-Specific Vocational Interest Model

    DTIC Science & Technology

    2006-12-01

    Enforcement Air Systems Installation/Repair Maritime Interests Applied Mathematics Media Arts Aviation Interests Medical and Dental Services...Technician (AS) 9. Aviation Electronics Technician (AT) 10. Aviation Maintenance Administrationman (AZ) 11. Culinary Specialist (CS) 12. Cryptologic...equipment. 90. Perform preventive and corrective maintenance on state-of-the- art electronic and electromechanical equipment and systems, requiring

  3. 14 CFR 43.3 - Persons authorized to perform maintenance, preventive maintenance, rebuilding, and alterations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... provisions of paragraph (g) of this section, the Administrator may approve a certificate holder under Part... Administrator; and (3) Perform any inspection required by part 91 or part 125 of this chapter on aircraft it..., and alterations. (k) Updates of databases in installed avionics meeting the conditions of this...

  4. North American Board of Certified Energy Practitioners Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lawrence, Richard

    The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of allmore » five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.« less

  5. Preventive medicine oversight of splash pads on military installations.

    PubMed

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.

  6. Development of a Self-Sluicing Pressure Leaf Filter

    NASA Astrophysics Data System (ADS)

    Cousineau, Bernard L.; Lumsden, J. R.

    The cylindrical Kelly filter presses installed in the Ewarton Works "C" phase did not perform satisfactorily because of difficulties with head seals, locking rings, and shell retraction mechanisms. As rectification required major modifications, a concept of a press which did not require to be opened for sluicing was proposed. Test work of various sluicing and res lurrying spray arrangements was carried out, and this led to the design of a self-sluicing press which used the shell of an existing Kelly press with its main axis vertical. One press was converted by July 1972, and a development period started. Although initial operation was encouraging, effective sluicing could not be guaranteed after 30 shifts. Modifications to leaf spacing, spray rotational speed, spray slot width, feed pressure and pre-coat control by November 1973, however, allowed effective performance for all of the 800 hour canvas life. Advantages are: reduced operating and maintenance manpower, clean environment, and reduced maintenance cost. The use of 1st wash overflow for sluicing has reduced caustic soda and canvas consumption. Ewarton Works now has four converted self-sluicing presses, and arc converting five more, and Arvida Works plan the installation of one for tests on red pressing (blow-off filtration). A side benefit of the development was the study of the benefits of constant pressure overflow filtration.

  7. WOGEN. Work Order Generation Macros for Word Perfect 6.X for Windows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grenz, G.

    Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO`s) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less

  8. Work Order Generation Macros for Word Perfect 6.X for Windows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grenz, Gordon G.

    Included are three general WP macros (two independent and one multiple) and a template used at the Test Reactor Area (TRA) for the generation of the Work Orders (WO's) used to perform corrective and preventative maintenance, as well as modifications of existing systems and installation of new systems. They incorporate facility specific requirements as well as selected federal/state orders. These macros are used to generate a WP document which is then converted into ASCII text for import to the maintenance software. Currently we are using MCRS but should be compatible with other platforms such as Passport. Reference the included filemore » Wogen.txt for installation and usage instructions.« less

  9. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...

  10. Crime Prevention in Schools: Specification, Installation, and Maintenance of Intruder Alarm Systems. Building Bulletin 69.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…

  11. Solar-energy landmark Building-Columbia, Missouri

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Report includes design, cost, installation, maintenance, and performance details for attractive solar installation which supplies space heating for four-story Visitors Center. 176 hydronic flat-plate collectors, water-to-water heat exchanger, and 5,000-gallon storage tank comprise system which provides 71 percent of building's heat. Natural-gas-fired boiler supplies auxiliary hot water to heating system when necessary.

  12. Professional Certification

    EPA Pesticide Factsheets

    WaterSense recognizes certification programs for irrigation professionals that meet the specification criteria. Certification programs cover three areas: irrigation system design, installation and maintenance, and system auditing.

  13. Vehicle Maintenance Manpower Requirements for U.S. Army Installation Directorates of Engineering and Housing Based on Air Force, Navy, and Army Reserves’ Staffing Techniques.

    DTIC Science & Technology

    1986-07-01

    Reserves staffing. A comparison with the Navy technique, which requires estimates of mileage and operating hours, was not possible since these data were...Directorate of Engineering and Housing (DEH) vehicle maintenance activities. To make comparisons, manpower requirements data totaling two megabytes of

  14. Landscaping and Turf Management. Instructor Guide, Volume 22, Number 2, and Student Reference, Volume 22, Number 3.

    ERIC Educational Resources Information Center

    Rodekohr, Sherie; Waeckerle, Debi

    This instructor guide and the corresponding student reference contain 12 units, which cover the following topics: (1) opportunities in the landscaping and turfgrass industries; (2) how plants grow; (3) plant identification; (4) hand and power tools (identification and maintenance); (5) pesticides; (6) installation and maintenance of trees and…

  15. 78 FR 29201 - Notice of Availability of Finding of No Significant Impact for the Proposed Vantage Pipeline US...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-17

    ... maintenance at the borders of the United States, of facilities for the exportation or importation of liquid... installation of associated aboveground mainline block valves; and the use of access roads and pipe storage and... Permit authorizing the construction, connection, operation, and maintenance of the Cross Border Facility...

  16. 14 CFR 121.343 - Flight data recorders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...

  17. 15 CFR 740.20 - License Exception Strategic Trade Authorization (STA).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., maintenance, repair, overhaul, or refurbishing of an item in one of the countries listed in Country Group A:5...,” “production,” operation installation, maintenance, repair, overhaul, or refurbishing of an item in one of the...) Agrees to permit a U.S. Government end-use check with respect to the items. (3) Notification to consignee...

  18. 14 CFR 121.343 - Flight data recorders.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...

  19. 14 CFR 121.343 - Flight data recorders.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...

  20. 14 CFR 121.343 - Flight data recorders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...

  1. 14 CFR 121.343 - Flight data recorders.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... recorder must be installed at the next heavy maintenance check after May 26, 1994, but no later than May 26, 1995. A heavy maintenance check is considered to be any time an aircraft is scheduled to be out of..., 1995, compliance date for all aircraft on that list. (3) After May 26, 1994, any aircraft that is...

  2. Computer Associates International, CA-ACF2/VM Release 3.1

    DTIC Science & Technology

    1987-09-09

    Associates CA-ACF2/VM Bibliography International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Program Logic Manual...publication number LY20-0889 International Business Machines International Business Machines Corporation, IBM System/370 Principles of Operation...publication number GA22-7000 International Business Machines Corporation, IBM Virtual Machine/Directory Maintenance Installation and System Administrator’s

  3. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  4. 40 CFR 63.7741 - What are the installation, operation, and maintenance requirements for my monitors?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; and (2) Install and maintain CPMS to measure and record the pH of the scrubber blowdown according to the requirements in paragraph (e)(2)(i) through (iv) of this section. (i) Locate the pH sensor in a position that provides a representative measurement of the pH and that minimizes or eliminates internal and...

  5. Hard metal exposures. Part 1: Observed performance of three local exhaust ventilation systems.

    PubMed

    Guffey, S E; Simcox, N; Booth, D W; Hibbard, R; Stebbins, A

    2000-04-01

    Not every ventilation system performs as intended; much can be learned when they do not. The purpose of this study was to compare observed initial performance to expected levels for three saw-reconditioning shop ventilation systems and to characterize the changes in performance of the systems over a one-year period. These three local exhaust ventilation systems were intended to control worker exposures to cobalt, cadmium, and chromium during wet grinding, dry grinding, and welding/brazing activities. Prior to installation the authors provided some design guidance based on Industrial Ventilation, a Manual of Recommended Practice. However, the authors had limited influence on the actual installation and operation and no line authority for the systems. In apparent efforts to cut costs and to respond to other perceived needs, the installed systems deviated from the specifications used in pressure calculations in many important aspects, including adding branch ducts, use of flexible ducts, the choice of fans, and the construction of some hoods. After installation of the three systems, ventilation measurements were taken to determine if the systems met design specifications, and worker exposures were measured to determine effectiveness. The results of the latter will be published as a companion article. The deviations from design and maintenance failures may have adversely affected performance. From the beginning to the end of the study period the distribution of air flow never matched the design specifications for the systems. The observed air flows measured within the first month of installation did not match the predicated design air flows for any of the systems, probably because of the differences between the design and the installed system. Over the first year of operation, hood air flow variability was high due to inadequate cleaning of the sticky process materials which rapidly accumulated in the branch ducts. Poor distribution of air flows among branch ducts frequently produced individual hood air flows that were far below specified design levels even when the total air flow through that system was more than adequate. To experienced practitioners, it is not surprising that deviations from design recommendations and poor maintenance would be associated with poor system performance. Although commonplace, such experiences have not been documented in peer-reviewed publications to date. This publication is a first step in providing that documentation.

  6. Water safety in healthcare facilities. The Vieste Charter.

    PubMed

    Bonadonna, L; Cannarozzi de Grazia, M; Capolongo, S; Casini, B; Cristina, M L; Daniele, G; D'Alessandro, D; De Giglio, O; Di Benedetto, A; Di Vittorio, G; Ferretti, E; Frascolla, B; La Rosa, G; La Sala, L; Lopuzzo, M G; Lucentini, L; Montagna, M T; Moscato, U; Pasquarella, C; Prencipe, R; Ricci, M L; Romano Spica, V; Signorelli, C; Veschetti, E

    2017-01-01

    The Study Group on Hospital Hygiene of the Italian Society of Hygiene, Preventive Medicine and Public Health (GISIO-SItI) and the Local Health Authority of Foggia, Apulia, Italy, after the National Convention "Safe water in healthcare facilities" held in Vieste-Pugnochiuso on 27-28 May 2016, present the "Vieste Charter", drawn up in collaboration with experts from the National Institute of Health and the Ministry of Health. This paper considers the risk factors that may affect the water safety in healthcare facilities and reports the current regulatory frameworks governing the management of installations and the quality of the water. The Authors promote a careful analysis of the risks that characterize the health facilities, for the control of which specific actions are recommended in various areas, including water safety plans; approval of treatments; healthcare facilities responsibility, installation and maintenance of facilities; multidisciplinary approach; education and research; regional and national coordination; communication.

  7. View of STS-134 Crew Members during EVA-1

    NASA Image and Video Library

    2011-05-20

    S134-E-009265 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at center frame. Photo credit: NASA

  8. View of STS-134 Crew Members during EVA-1

    NASA Image and Video Library

    2011-05-20

    S134-E-009267 (20 May 2011) --- NASA astronauts Andrew Feustel (right) and Greg Chamitoff, both STS-134 mission specialists, participate in the mission's first session of extravehicular activity (EVA) as construction and maintenance continue on the International Space Station. During the six-hour, 19-minute spacewalk, Feustel and Chamitoff retrieved long-duration materials exposure experiments and installed another, installed a light on one of the station?s rail line handcarts, made preparations for adding ammonia to a cooling loop and installed an antenna for the External Wireless Communication system. The newly-installed Alpha Magnetic Spectrometer-2 (AMS) is at lower center frame. Photo credit: NASA

  9. Technology review of flight crucial flight control systems (application of optical technology)

    NASA Technical Reports Server (NTRS)

    Rediess, H. A.; Buckley, E. C.

    1984-01-01

    The survey covers the various optical elements that are considered in a fly-by-light flight control system including optical sensors and transducers, optical data links, so-called optical actuators, and optical/electro-optical processing. It also addresses airframe installation, maintenance, and repair issues. Rather than an in-depth treatment of optical technology, the survey concentrates on technology readiness and the potential advantages/disadvantages of applying the technology. The information was assembled from open literature, personal interviews, and responses to a questionnaire distributed specifically for this survey. Not all of the information obtained was consistent, particularly with respect to technology readiness. The synthesis of information into the perception of the state-of-technology is presented.

  10. Linac cryogenic distribution system maintenance and upgrades at JLab

    NASA Astrophysics Data System (ADS)

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm3 of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sliwinski, B.J.; Kermath, D.; Kemme, M.R.

    There is a growing body of information related to facility indoor air quality (IAQ) and its affect on the health and productivity of building occupants. Indoor air pollution can increase employee absenteeism and reduce productivity. Poor IAQ may be a result of poor building or ventilation design, improper maintenance, or inappropriate energy conservation strategies. To help ensure the health, welfare, and productivity of Army personnel and the performance of Army facilities, installation operations and maintenance (O and M) personnel need access to relevant and useful information about IAQ issues. This report includes background information for O and M managers andmore » staff, an installation-level IAQ management plan, and practical O and M procedures for correcting the problems that most commonly lead to IAQ-related complaints.« less

  12. 21 CFR 1250.30 - Construction, maintenance and use of places where food is prepared, served, or stored.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... designed, installed, and maintained as to prevent contamination of the water supply, food, and food... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Construction, maintenance and use of places where food is prepared, served, or stored. 1250.30 Section 1250.30 Food and Drugs FOOD AND DRUG...

  13. Instruction manual model 600F, data transmission test set

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Information necessary for the operation and maintenance of the Model 600F Data Transmission Test Set is presented. A description is contained of the physical and functional characteristics; pertinent installation data; instructions for operating the equipment; general and detailed principles of operation; preventive and corrective maintenance procedures; and block, logic, and component layout diagrams of the equipment and its major component assemblies.

  14. Maintenance of the Language Laboratory. ERIC Focus Reports on the Teaching of Foreign Languages, Number 28.

    ERIC Educational Resources Information Center

    Medley, Frank W.

    The purpose of this report is to identify the various aspects of language laboratory operation and maintenance as they relate to the teacher and the administrator, and to suggest certain practices which will result in more effective utilization of the installation. Discussion of the language laboratory includes: (1) selection of personnel, (2)…

  15. Segment Alignment Maintenance System for the Hobby-Eberly Telescope

    NASA Technical Reports Server (NTRS)

    Rakoczy, John; Burdine, Robert (Technical Monitor)

    2001-01-01

    NASA's Marshall Space Flight Center, in collaboration with Blue Line Engineering of Colorado Springs, Colorado, is developing a Segment Alignment Maintenance System (SAMS) for McDonald Observatory's Hobby-Eberly Telescope (HET). The SAMS shall sense motions of the 91 primary mirror segments and send corrections to HET's primary mirror controller as the mirror segments misalign due to thermo -elastic deformations of the mirror support structure. The SAMS consists of inductive edge sensors. All measurements are sent to the SAMS computer where mirror motion corrections are calculated. In October 2000, a prototype SAMS was installed on a seven-segment cluster of the HET. Subsequent testing has shown that the SAMS concept and architecture are a viable practical approach to maintaining HET's primary mirror figure, or the figure of any large segmented telescope. This paper gives a functional description of the SAMS sub-array components and presents test data to characterize the performance of the subarray SAMS.

  16. A Bayesian Model and Stochastic Exposure (Dose) Estimation for Relative Exposure Risk Comparison Involving Asbestos-Containing Dropped Ceiling Panel Installation and Maintenance Tasks.

    PubMed

    Boelter, Fred W; Xia, Yulin; Persky, Jacob D

    2017-09-01

    Assessing exposures to hazards in order to characterize risk is at the core of occupational hygiene. Our study examined dropped ceiling systems commonly used in schools and commercial buildings and lay-in ceiling panels that may have contained asbestos prior to the mid to late 1970s. However, most ceiling panels and tiles do not contain asbestos. Since asbestos risk relates to dose, we estimated the distribution of eight-hour TWA concentrations and one-year exposures (a one-year dose equivalent) to asbestos fibers (asbestos f/cc-years) for five groups of workers who may encounter dropped ceilings: specialists, generalists, maintenance workers, nonprofessional do-it-yourself (DIY) persons, and other tradespersons who are bystanders to ceiling work. Concentration data (asbestos f/cc) were obtained through two exposure assessment studies in the field and one chamber study. Bayesian and stochastic models were applied to estimate distributions of eight-hour TWAs and annual exposures (dose). The eight-hour TWAs for all work categories were below current and historic occupational exposure limits (OELs). Exposures to asbestos fibers from dropped ceiling work would be categorized as "highly controlled" for maintenance workers and "well controlled" for remaining work categories, according to the American Industrial Hygiene Association exposure control rating system. Annual exposures (dose) were found to be greatest for specialists, followed by maintenance workers, generalists, bystanders, and DIY. On a comparative basis, modeled dose and thus risk from dropped ceilings for all work categories were orders of magnitude lower than published exposures for other sources of banned friable asbestos-containing building material commonly encountered in construction trades. © 2016 The Authors Risk Analysis published by Wiley Periodicals, Inc. on behalf of Society for Risk Analysis.

  17. Zigbee networking technology and its application in Lamost optical fiber positioning and control system

    NASA Astrophysics Data System (ADS)

    Jin, Yi; Zhai, Chao; Gu, Yonggang; Zhou, Zengxiang; Gai, Xiaofeng

    2010-07-01

    4,000 fiber positioning units need to be positioned precisely in LAMOST(Large Sky Area Multi-object Optical Spectroscopic Telescope) optical fiber positioning & control system, and every fiber positioning unit needs two stepper motors for its driven, so 8,000 stepper motors need to be controlled in the entire system. Wireless communication mode is adopted to save the installing space on the back of the focal panel, and can save more than 95% external wires compared to the traditional cable control mode. This paper studies how to use the ZigBee technology to group these 8000 nodes, explores the pros and cons of star network and tree network in order to search the stars quickly and efficiently. ZigBee technology is a short distance, low-complexity, low power, low data rate, low-cost two-way wireless communication technology based on the IEEE 802.15.4 protocol. It based on standard Open Systems Interconnection (OSI): The 802.15.4 standard specifies the lower protocol layers-the physical layer (PHY), and the media access control (MAC). ZigBee Alliance defined on this basis, the rest layers such as the network layer and application layer, and is responsible for high-level applications, testing and marketing. The network layer used here, based on ad hoc network protocols, includes the following functions: construction and maintenance of the topological structure, nomenclature and associated businesses which involves addressing, routing and security and a self-organizing-self-maintenance functions which will minimize consumer spending and maintenance costs. In this paper, freescale's 802.15.4 protocol was used to configure the network layer. A star network and a tree network topology is realized, which can build network, maintenance network and create a routing function automatically. A concise tree network address allocate algorithm is present to assign the network ID automatically.

  18. Boosting a Low-Cost Smart Home Environment with Usage and Access Control Rules.

    PubMed

    Barsocchi, Paolo; Calabrò, Antonello; Ferro, Erina; Gennaro, Claudio; Marchetti, Eda; Vairo, Claudio

    2018-06-08

    Smart Home has gained widespread attention due to its flexible integration into everyday life. Pervasive sensing technologies are used to recognize and track the activities that people perform during the day, and to allow communication and cooperation of physical objects. Usually, the available infrastructures and applications leveraging these smart environments have a critical impact on the overall cost of the Smart Home construction, require to be preferably installed during the home construction and are still not user-centric. In this paper, we propose a low cost, easy to install, user-friendly, dynamic and flexible infrastructure able to perform runtime resources management by decoupling the different levels of control rules. The basic idea relies on the usage of off-the-shelf sensors and technologies to guarantee the regular exchange of critical information, without the necessity from the user to develop accurate models for managing resources or regulating their access/usage. This allows us to simplify the continuous updating and improvement, to reduce the maintenance effort and to improve residents’ living and security. A first validation of the proposed infrastructure on a case study is also presented.

  19. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

  20. 48 CFR 9.501 - Definition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... consultant when rendering— (1) Services excluded in subpart 37.2; (2) Routine engineering and technical services (such as installation, operation, or maintenance of systems, equipment, software, components, or...

Top