Science.gov

Sample records for installations nucleaires conclusions

  1. Sweet Conclusion

    ERIC Educational Resources Information Center

    Shirley, Britt M.; Wooldridge, Barbara Ross; Camp, Kerri M.

    2012-01-01

    Jen Harrington is the owner and pastry chef of Sweet Conclusion, a bakery in Tampa, Florida. Most of Harrington's business comes from baking wedding cakes, but she has been attempting to attract customers to her retail bakery, where she sells cupcakes, pies, ice cream, and coffee. Nearly four years she opened Sweet Conclusion, the retail part of…

  2. Conclusions

    NASA Astrophysics Data System (ADS)

    Ahonen, Pasi; Alahuhta, Petteri; Daskala, Barbara; Delaitre, Sabine; Hert, Paul De; Lindner, Ralf; Maghiros, Ioannis; Moscibroda, Anna; Schreurs, Wim; Verlinden, Michiel

    Some say that an increase in security does not necessarily mean a further encroachment on privacy - indeed, security is necessary to protect personal data and our privacy. Networks must be secure, our personal devices, reliable, dependable and trustworthy. But security is a multifaceted term, with many dimensions. We are of the view that an increase in security most likely will encroach upon our privacy in an ambient intelligence world. Surveillance cameras will continue to proliferate. We assume that, whatever the law is, whatever privacy protections government and business say they honour, our telecommunications, e-mails and Internet usage will be monitored to an increasing degree. The same will be true of our interfaces with the world of ambient intelligence.

  3. Conclusion

    NASA Astrophysics Data System (ADS)

    Ivancevic, Vladimir G.; Reid, Darryn J.

    2015-11-01

    It is often held that things should always be made simple, which presumes that either that they can always be made simple or that all the jetisoned logic doesn't matter anyway. Alledgedly, anything should be explainable so that anyone can understand it. Don't get bogged down in dreary details. It should be effortless for the reader: low-dimensional systems exhibit complex behaviour while high-dimensional systems exhibit simple behaviour (to return to our prolegomonal opening), competition is a universal solution, demand must increase as price falls, and everything under the sun neatly fits a power law. Or so the story goes...

  4. Conclusions

    NASA Astrophysics Data System (ADS)

    Binder, P.-M.; Smith, K.

    If you made it to this point, this is what we have tried to offer you: a view of language like no other book has provided before. It is quite possible that this is one of very few books you have read on the subject; it could even be your first. Chances are that those you have read were written for a general audience. Some of them are very good, but they usually try to push a particular viewpoint of their author. Or you may have followed an introductory linguistics course at the university level. Such courses, and their textbooks, focus on technical aspects of the subject: the details of theories of phonology, syntax, semantics and so on. Knowledge of all of these areas is absolutely necessary for a deep understanding of the subject. But both single-author general books and technical textbooks have the same shortcoming: they do not give the reader a broad and complete account of how language works.

  5. Conclusion

    NASA Technical Reports Server (NTRS)

    Arnold, Steven M.; Wong, Terry T.

    2011-01-01

    This compilation of papers in this book represents approximately half of the works discussed at the MS&T 2010 symposium entitled Tools, Models, Databases, and Simulation Tools Developed and Needed to Realize the Vision of Integrated Computational Materials Engineering at Materials Science & Technology wherein five sessions comprised of 33 presentations was organized. The goal of the symposium was two fold To provide a forum in which current state-of-the-art methods for ICME (e.g., information informatics, experimentation, and modeling) could be openly discussed and critiqued by not only materials scientist but also structural engineers/researchers, component designers, industrial leaders and government program managers. To leave the symposium and in particular the panel discussion with a clear idea of the gaps and barriers (both technical, cultural and economical) that must be addressed in order for ICME to fully succeed. The organizers felt that these goals were met, as particularly evident by the standing room only attendance during a lively panel discussion session at the end of the Symposium. However it is the firm belief of the editors of this book that this symposium was merely a start in the right direction, and that subsequent conferences/symposium (e.g., First World Congress on Integrated Computational Materials Engineering to be held July 10-14, 2011 at Seven Springs Mountain Resort in Pennsylvania) must work hard to ensure that a truly diverse, multidisciplinary, community of researchers and practitioners are present and have ample opportunity for interaction. This will ensure that a proper balance between push and pull disciplines and technologies is maintained so that this emerging focus area, Integrated Computational Materials Engineering (ICME), has the greatest potential for success and impact on "system-level" payoffs. Similarly, a pro-active approach is required to reform historical modes of operation in industry, government and the academic sectors so as to facilitate multidisciplinary collaboration and to clearly articulate the vision and scope of ICME.

  6. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  7. Conclusions and Recommendations. Chapter 37

    NASA Technical Reports Server (NTRS)

    Lamar, John E.; Hummel, Dietrich

    2009-01-01

    This chapter provides a brief wrap-up of the task group report and focuses on the overall conclusions and recommendations for future work for the CAWAPI and VFE-2 facets beyond the task group. The overall conclusion is that the Technology Readiness Level (TRL) of CFD solvers has been improved in predicting the flow-physics of vortex-dominated flows during the work of the task group, by having flight and wind-tunnel data available for comparison. Moreover, like all good scientific studies, this task group has identified flight conditions on the F-16XL airplane or wind-tunnel test conditions for a specific leading-edge radius on the 65 delta-wing model where the TRL still needs to be increased.

  8. [SENTIERI Project: discussion and conclusions].

    PubMed

    Pirastu, Roberta; Ricci, Paolo; Comba, Pietro; Bianchi, Fabrizio; Biggeri, Annibale; Conti, Susanna; Fazzo, Lucia; Forastiere, Francesco; Iavarone, Ivano; Martuzzi, Marco; Musmeci, Loredana; Pasetto, Roberto; Zona, Amerigo; Crocetti, Emanuele

    2014-01-01

    showing the increase, considering latency and the length of the observation period. Of further interest are results relating to diseases of the urinary tract such as kidney failure in the NPCSs of Basso bacino del fiume Chienti, Taranto, Milazzo and Priolo. Overall, the results discussed above are consistent with the previous findings pertaining to mortality for 1995-2002. The present analysis also introduces a new element - the study of cancer incidence and hospital discharges - which can tell us a great deal about diseases with high survival rates or non lethal ones. The first is the case of thyroid cancer, which presents increases in both databases and for both genders in a number of NPCSs (Brescia-Caffaro, Laghi di Mantova, Milazzo, Sassuolo- Scandiano and Taranto). The study of cancer incidence and hospital discharges also revealed cancer excesses for melanoma, breast cancer and non Hodgkin lymphoma in Brescia-Caffaro NPCS where PCBs (Polychlorinated biphenyl) are the site's main pollutant. PCBs, according to the 2013 evaluation of the International Agency for Research on Cancer, are ascertained human carcinogens for melanoma and probable carcinogens for breast cancer and non-Hodgkin lymphoma. The results pertaining to cancer incidence in the 17 NPCSs can also be presented using rankings by area or disease analyzed by a multivariate hierarchical Bayesian model. These rankings reveal an overlapping of credibility intervals, such that it is not possible to speak of a limited number of cancer sites or of certain NPCSs as being particularly affected. Every NPCS, therefore, must be considered individually and ordering them by ranking of cancer incidence wouldn't be appropriate. Data collected concerning some of the NPCSs in the context of the SENTIERI Project is so conclusive that remediation measures can immediately be put in place. This is the case in the Biancavilla and Brescia-Caffaro NPCSs. A similar conclusion can be drawn for complex locations such as Taranto

  9. AMS Time Lapse Installation

    NASA Video Gallery

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  10. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  11. Solenoidal Magnet Installation

    SciTech Connect

    Stredde, H.; Lee, A.; /Fermilab

    1998-01-21

    The major modification to the D0 detector for the next physics collider run is the upgrade of the central tracking system. The first component to be installed will be the solenoid magnet, with the central pre-shower attached. This engineering note is directed to the installation of the solenoid magnet and the equipment needed to accomplish this task. As part of the installation process, the main detector must undergo a change in position of one of its major components, namely the South End Calorimeter (SEC). This calorimeter must be completely decoupled from the main detector, i.e. all cabling and cryo lines removed. The equipment used for installing all calorimeters (bridge and support structures) will be put into position and the calorimeter (SEC) will be pulled off of the detector center beam and parked on the south sidewalk of the D0 Assembly Hall. The necessary cryo lines will re-connected in order to keep the cryostat cold. This calorimeter will remain here during the greater portion of the upgrade reconfiguration schedule. When this task is finished, the old central tracking system and its mounts will be removed from the bore of the Central Calorimeter (CC). The main detector is now ready to receive the new tracking system, starting with the solenoid magnet.

  12. Mineral mining installations

    SciTech Connect

    Werner, G.; Wisniewski, P.

    1983-12-15

    A mineral mining installation serves to win mineral by explosive blasting. The installation employs a shuttle conveyor arranged alongside a mineral face. Roof supports stand side-by-side at the side of the conveyor remote from the conveyor. The roof supports are connected to the conveyor through shifting rams and have roof-engageable caps or the like supported on hydraulic props. The pans of the conveyor have upstanding walls at the rear side nearest the roof supports which carry rails at their upper ends. The roof caps have wall components pivoted thereto and hydraulic piston and cylinder units serve to swing the wall components up and down. When explosive blasting takes place the wall components are swung down to engage on the walls of the conveyor pans to form a screen between the winning region and the access region of the working.

  13. Cults and mental health: clinical conclusions.

    PubMed

    Levine, S V

    1981-12-01

    The field of cults and their relation to psychological and psychiatric disorder is reft with rhetoric and opinion. There has been a particular dearth of documentation and substantiated data supporting psychiatric opinion. As a result of considerable research, clinical work, and an extensive literature review, certain conclusions or strongly suggested positions are enunciated. An attempt is made to substantiate each of the ten assertions based on existing data, in the hope that they will clarify the muddy existing data, area, make clinical positions and interventions more soundly based, and inspire debate and heuristic efforts.

  14. Engineering and Installation Services

    DTIC Science & Technology

    2007-11-02

    Update data on existing communications and information systems on the Communica- tions and Information Systems Installation Records ( CSIR ) according to...information by two different survey methods: desk top and on-site. 4.9.1.1. Perform desktop surveys by using CSIRs , available data, and telephone...and equipment. 4.15. Project Drawings . Upon project completion, the team chief annotates two sets of CSIR drawings. The team chief leaves one set with

  15. Leadership for Sustainable Installations

    DTIC Science & Technology

    2011-04-01

    Doppelt, B. (2010). Leading change toward sustainability: a change-management guide for business, government and civil society , 2nd edition. [ Books24x7 ...social, environmental and economic impacts. [ Books24x7 version]. San Francisco: Berrett-Koehler Publishers. Journal of Installation Management Spring...Strategy for sustainability: a business manifesto [ Books24x7 version]. Cambridge, MA: Harvard Business Press. Retrieved from http://common.books24x7.com/book/id_31212/book.asp

  16. Installation Strategic Planning Guidebook

    DTIC Science & Technology

    2012-05-01

    team members can hear each other and not be distracted by outside noise • Access to bathrooms, snacks , beverages • Note the plenary room can often...workshop. The stakeholders are working hard over the 2.5 days, and easy access to beverages, Installation Strategic Planning Guidebook 50 snacks ...for snacks and beverages. In several cases, Garrisons have also arranged for lunch orders (placed and paid for by participants) to be delivered (with

  17. Samus Toroid Installation Fixture

    SciTech Connect

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  18. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  19. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  20. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  1. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  2. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  3. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  4. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  5. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  6. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  7. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  8. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  9. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  10. Nuclear reactor installation

    SciTech Connect

    Straub, H.

    1987-09-29

    A nuclear reactor installation is described comprising a pressure vessel having a pair of concentric walls defining a peripheral chamber therebetween; a reactor core disposed within the pressure vessel for heating a primary coolant; a cooling circuit for conveying a secondary coolant in heat exchange relation with the primary coolant. The circuit includes at least one primary heat exchanger within the pressure vessel, at least one secondary heat exchanger outside the pressure vessel, coolant lines extending through the pressure vessel and connecting the heat exchanges together, and circulating means for circulating a secondary coolant through the heat exchangers; a heat sink extending around the pressure vessel; a source of at least one flowable heat-insulating agent outside the pressure vessel; a source of at least one flowable heat-conductive agent outside the pressure vessel; first means communicating the source of heat-insulating agent with the peripheral chamber during normal operation of the reactor core; and second means communicating the source of heat-conductive agent with the peripheral chamber to fill the chamber with heat-conductive agent in response to a disturbance in reactor core cooling.

  11. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  12. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  13. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  14. Achieving Efficiencies in Army Installations.

    DTIC Science & Technology

    2007-11-02

    34" ’■■"■" 1 USAWC STRATEGY RESEARCH PROJECT Achieving Efficiencies in Army Installations by Richard Fliss Col. Richard M. Meinhart Project...government agency. STRATEGY RESEARCH PROJECT ACHIEVING EFFICIENCIES IN ARMY INSTALLATIONS BY RICHARD FLISS DISTRIBUTION STATEMENT A: Approved...for public release. Distribution is unlimited. DTIC QUALITY INSPECTED & USAWC CLASS OF 1998 U.S. ARMY WAR COLLEGE, CARLISLE BARRACKS, PA 17013-5050

  15. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  16. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  17. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  18. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  19. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  20. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a) Each manufacturer of a device requiring installation shall establish and maintain adequate...

  1. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not...

  2. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not...

  3. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not...

  4. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not...

  5. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not...

  6. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  7. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  8. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  9. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  10. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  11. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  12. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  13. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  14. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  15. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  16. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  17. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  18. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  19. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  20. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  1. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  2. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  3. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  4. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  5. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  6. Aasgard subsea installation on schedule

    SciTech Connect

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  7. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  8. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  9. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  10. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  11. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Hearings § 10.82 Proposed findings and conclusions; briefs. In any proceeding... and conclusions of law. Briefs may be filed in support of proposed findings and conclusions either...

  12. Simplified installation of thrust bearings

    NASA Technical Reports Server (NTRS)

    Sensenbaugh, N. D.

    1980-01-01

    Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.

  13. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  14. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  15. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 6 2013-10-01 2013-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with...

  16. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 6 2012-10-01 2012-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with...

  17. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  18. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  19. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  20. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  1. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The...

  2. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of...

  3. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 6 2014-10-01 2014-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with...

  4. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  5. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  6. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  7. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together...

  8. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  9. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  10. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  11. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of...

  12. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  13. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a...

  14. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed...

  15. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 672.19... FOUNDATION ENFORCEMENT AND HEARING PROCEDURES § 672.19 Proposed findings, conclusions, and order. Unless otherwise ordered by the Presiding Officer, any party may submit proposed findings of fact, conclusions...

  16. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... conclusions. 251.52 Section 251.52 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS... PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions. (a) Any party to the proceeding may file proposed findings of fact and conclusions, briefs, or...

  17. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The...

  18. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  19. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  20. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The...

  1. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together...

  2. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  3. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  4. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  5. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of...

  6. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  7. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of...

  8. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together...

  9. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  10. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The...

  11. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  12. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a...

  13. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  14. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed...

  15. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 952.23 Section... conclusions. (a) Each party to a proceeding, except one who fails to answer the complaint or, having answered... fact, conclusions of law, orders and supporting reasons either in oral or written form in...

  16. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  17. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of...

  18. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  19. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  20. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  1. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 1 2013-04-01 2013-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  2. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  3. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of...

  4. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may...

  5. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of...

  6. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  7. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The...

  8. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  9. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of...

  10. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  11. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a...

  12. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  13. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  14. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  15. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  16. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each... discretion of the presiding officer such is not appropriate, submit proposed findings of fact, conclusions...

  17. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  18. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of...

  19. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions of law, briefs and...

  20. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a...

  1. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together...

  2. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  3. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conclusions. 251.52 Section 251.52 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS... PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions. (a) Any party to the proceeding may file proposed findings of fact and conclusions, briefs, or...

  4. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of...

  5. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  6. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  7. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with...

  8. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  9. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of...

  10. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Proposed findings, conclusions, and order. 672.19... FOUNDATION ENFORCEMENT AND HEARING PROCEDURES § 672.19 Proposed findings, conclusions, and order. Unless otherwise ordered by the Presiding Officer, any party may submit proposed findings of fact, conclusions...

  11. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of...

  12. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of...

  13. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together...

  14. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed...

  15. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  16. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may...

  17. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  18. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may...

  19. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions of law, briefs and...

  20. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  1. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  2. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  3. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  4. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  5. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed...

  6. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a...

  7. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may...

  8. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  9. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may...

  10. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of...

  11. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed...

  12. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of...

  13. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  14. The Case Study of Off-Campus Postsecondary Education on Military Bases. Final Report. Summary, Conclusions, Recommendations.

    ERIC Educational Resources Information Center

    Allen, G. Jack; Andrews, Grover J.

    Results and recommendations of an in-depth study of education offered at 25 military installations are presented. Information is provided on study goals and the research design, and strengths/weaknesses of the study. A summary of site visitation findings is presented, along with conclusions concerning: institutional purpose and goals, organization…

  15. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  16. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  17. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  18. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  19. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  20. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  1. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  2. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  3. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  4. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  5. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  6. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  7. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  8. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  9. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  10. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  11. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  12. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  13. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  14. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  15. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  16. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  17. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  18. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2011-10-01 2011-10-01 false Radiotelephone installations. 183.392 Section...

  19. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section...

  20. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  1. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  2. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  3. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  4. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  5. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  6. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  7. Move Sequences in Graduate Research Paper Introductions and Conclusions

    ERIC Educational Resources Information Center

    Madrunio, Marilu Rañosa

    2012-01-01

    Graduate students submit academic papers at the end of the term as part of their coursework. Such papers contain introduction moves which may be troublesome and conclusion moves which may contain sub-moves not really required. This paper is aimed at assessing what particular moves are employed in the introduction and conclusion sections of 21…

  8. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 111.68 Section 111.68 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions....

  9. Jumping to the Right Conclusions, Inferences, and Predictions

    ERIC Educational Resources Information Center

    Giannattasio, Jack; Bazler, Judith

    2005-01-01

    Writing meaningful conclusions, drawing accurate inferences, and making relevant predictions are essential skills that many adolescents lack. The differences among conclusions, inferences, and predictions, although subtle, must be recognized to accurately analyze and interpret lab data. During one of the authors' 14 years as a physics and…

  10. On symbolic models for Single-Conclusion Logic of Proofs

    SciTech Connect

    Krupski, Vladimir N

    2011-05-31

    In this paper we define symbolic models for Single-Conclusion Logics of Proofs. We prove the soundness and completeness of these logics with respect to the corresponding classes of symbolic models. We apply the semantic methods developed in this paper to justify the use of terms of single-conclusion logic of proofs as notation for derivations in this logic. Bibliography: 17 titles.

  11. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  12. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  13. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  14. Device for installing rocket engines

    NASA Technical Reports Server (NTRS)

    George, T. R., Jr. (Inventor)

    1976-01-01

    A device for installing rocket engines is reported that is supported at a cant relative to vertical by an axially extensible, tiltable pedestal. A lifting platform supports the rocket engine at its thrust chamber exit, including a mount having a concentric base characterized by a concave bearing surface, a plurality of uniformly spaced legs extended radially from the base, and an annular receiver coaxially aligned with the base and affixed to the distal ends of said legs for receiving the thrust chamber exit. The lifting platform rests on a seat concentrically related to the pedestal and affixed to an extended end portion thereof having a convex bearing surface mated in sliding engagement with the concave bearing surface of the annular base for accommodating a rocking motion of the platform.

  15. Comparative environmental assessment of unconventional power installations

    NASA Astrophysics Data System (ADS)

    Sosnina, E. N.; Masleeva, O. V.; Kryukov, E. V.

    2015-08-01

    Procedure of the strategic environmental assessment of the power installations operating on the basis of renewable energy sources (RES) was developed and described. This procedure takes into account not only the operational process of the power installation but also the whole life cycles: from the production and distribution of power resources for manufacturing of the power installations to the process of their recovery. Such an approach gives an opportunity to make a more comprehensive assessment of the influence of the power installations on environments and may be used during adaptation of the current regulations and development of new regulations for application of different types of unconventional power installations with due account of the ecological factor. Application of the procedure of the integrated environmental assessment in the context of mini-HPP (Hydro Power Plant); wind, solar, and biogas power installations; and traditional power installation operating natural gas was considered. Comparison of environmental influence revealed advantages of new energy technologies compared to traditional ones. It is shown that solar energy installations hardly pollute the environment during operation, but the negative influence of the mining operations and manufacturing and utilization of the materials used for solar modules is maximum. Biogas power installations are on the second place as concerns the impact on the environment due to the considerable mass of the biogas installation and gas reciprocating engine. The minimum impact on the environment is exerted by the mini-HPP. Consumption of material and energy resources for the production of the traditional power installation is less compared to power installations on RES; however, this factor incomparably increases when taking into account the fuel extraction and transfer. The greatest impact on the environment is exerted by the operational process of the traditional power installations.

  16. Conclusiveness of natural languages and recognition of images

    SciTech Connect

    Wojcik, Z.M.

    1983-01-01

    The conclusiveness is investigated using recognition processes and one-one correspondence between expressions of a natural language and graphs representing events. The graphs, as conceived in psycholinguistics, are obtained as a result of perception processes. It is possible to generate and process the graphs automatically, using computers and then to convert the resulting graphs into expressions of a natural language. Correctness and conclusiveness of the graphs and sentences are investigated using the fundamental condition for events representation processes. Some consequences of the conclusiveness are discussed, e.g. undecidability of arithmetic, human brain assymetry, correctness of statistical calculations and operations research. It is suggested that the group theory should be imposed on mathematical models of any real system. Proof of the fundamental condition is also presented. 14 references.

  17. General conclusions regarding the planetary-solar-terrestrial interaction

    NASA Astrophysics Data System (ADS)

    Mörner, N.-A.; Tattersall, R.; Solheim, J.-E.; Charvatova, I.; Scafetta, N.; Jelbring, H.; Wilson, I. R.; Salvador, R.; Willson, R. C.; Hejda, P.; Soon, W.; Velasco Herrera, V. M.; Humlum, O.; Archibald, D.; Yndestad, H.; Easterbrook, D.; Casey, J.; Gregori, G.; Henriksson, G.

    2013-12-01

    In a collection of research papers devoted to the problem of solar variability and its origin in planetary beat, it is demonstrated that the forcing function originates from gravitational and inertial effects on the Sun from the planets and their satellites. This conclusion is shared by nineteen co-authors.

  18. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  19. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  20. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  1. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  2. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  3. Area V Vocational Education Planning Conclusions and Recommendations: Third Report.

    ERIC Educational Resources Information Center

    Area 5 Vocational Planning Committee, Pleasant Hill, CA.

    Conclusions and recommendations regarding the development of an Area Master Plan to provide maximum coordination between vocational, technical, adult, and continuing education agencies within Alameda and Contra Costa Counties, California, are presented. The Area Five Planning Committee, which developed the Master Plan, based its evaluation and…

  4. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  5. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  6. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  7. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  8. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  9. When Proofs Reflect More on Assumptions than Conclusions

    ERIC Educational Resources Information Center

    Dawkins, Paul Christian

    2014-01-01

    This paper demonstrates how questions of "provability" can help students engaged in reinvention of mathematical theory to understand the axiomatic game. While proof demonstrates how conclusions follow from assumptions, "provability" characterizes the dual relation that assumptions are "justified" when they afford…

  10. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 511.46 Section 511.46 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ADJUDICATIVE PROCEDURES Hearings §...

  11. Overview of human health in the Arctic: conclusions and recommendations

    PubMed Central

    Donaldson, Shawn; Adlard, Bryan; Odland, Jon Øyvind

    2016-01-01

    This article is intended to provide an overview of the key conclusions, knowledge gaps and key recommendations based on the recent 2015 Arctic human health assessment under the Arctic Monitoring and Assessment Program. This assessment was based primarily on data from human health monitoring and research studies and peer-reviewed literature published since the last assessment in 2009. PMID:27974138

  12. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Proposed findings and conclusions. 2.712 Section 2.712 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF... proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  13. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Proposed findings and conclusions. 901.48 Section 901.48 Employees' Benefits JOINT BOARD FOR THE ENROLLMENT OF ACTUARIES REGULATIONS GOVERNING THE PERFORMANCE OF ACTUARIAL SERVICES UNDER THE EMPLOYEE RETIREMENT INCOME SECURITY ACT OF 1974 Suspension...

  14. Hypothesis, Prediction, and Conclusion: Using Nature of Science Terminology Correctly

    ERIC Educational Resources Information Center

    Eastwell, Peter

    2012-01-01

    This paper defines the terms "hypothesis," "prediction," and "conclusion" and shows how to use the terms correctly in scientific investigations in both the school and science education research contexts. The scientific method, or hypothetico-deductive (HD) approach, is described and it is argued that an understanding of the scientific method,…

  15. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  16. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  17. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  18. Case Report: Silicatosis in a Carpet Installer

    PubMed Central

    Szeinuk, Jaime; Wilk-Rivard, Elizabeth J.

    2007-01-01

    Context Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. Case presentation We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Discussion Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Relevance to Clinical or Professional Practice Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung. PMID:17589602

  19. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  20. DoD Installation Energy Security

    DTIC Science & Technology

    2012-05-24

    Opportunities  New revenue streams ● DoD Drivers  Economics  Energy security Smart MicroGrids 3 Military Installations and Energy Markets...58.8 MW Military Installations Often Do Not Look Like Commercial Facilities 5 DoD and Microgrids ● Must include an interconnected set of loads...grid and the local utility market Primary goal of DoD installation microgrids is to provide energy security in a cost effective manner. 6

  1. Jumping to conclusions in untreated patients with Parkinson's disease

    PubMed Central

    de Rezende Costa, Flavio Henrique; Averbeck, Bruno; O'Sullivan, Sean S.; Vincent, Maurice Borges; Rosso, Ana Lucia; Lees, Andrew J.; Djamshidian, Atbin

    2016-01-01

    Background Jumping to conclusions due to impulsivity has been shown to be a sensitive marker for dopamine dysregulation and addictive behaviour patterns in treated patients with Parkinson's disease (PD). It is unknown whether drug naïve PD patients, who have never received dopaminergic therapy also have deficits in information sampling. Methods Twenty five de novo PD patients and twenty matched healthy controls were recruited and tested on the beads task, which is a validated information sampling task to assess reflection impulsivity and a temporal discounting questionnaire. Results Patients gathered significantly less information and made more irrational choices than matched controls. There was, however, no group difference on the temporal discounting questionnaire. Conclusions Poor information sampling and irrational decision making may be an inherent component of the neuropsychological deficit in Parkinson's disease. These findings suggest that underlying impulsivity detected by a metric task is common in de novo PD. PMID:26956927

  2. [Problems of occupational fitness conclusion on periodic medical examination].

    PubMed

    Alekseev, V B; Vlasova, E M; Nosov, A E; Ponomareva, T A; Kostarev, V G

    2014-01-01

    Additional examination in Occupational Pathology Center are economic loss both for employer and employee, as the employee receives payment for those days when in the examination. Analysis of over 600 cases of occupational fitness examination in Occupational Pathology Center according to referrals given by medical institutions providing periodic medical examination shows that in most cases the conclusion was possible during periodic medical examination. Difficulties in conclusion on workers' fitness for occupation during periodic medical examination, according to our viewpoint, result not from limited diagnostic facilities for adequate examination and unfitness disclosure, but from lack of information in primary medical documentation and inadequacy of occupational factor and work characteristics presented by employer to actual working conditions.

  3. Statistical Conclusion Validity: Some Common Threats and Simple Remedies

    PubMed Central

    García-Pérez, Miguel A.

    2012-01-01

    The ultimate goal of research is to produce dependable knowledge or to provide the evidence that may guide practical decisions. Statistical conclusion validity (SCV) holds when the conclusions of a research study are founded on an adequate analysis of the data, generally meaning that adequate statistical methods are used whose small-sample behavior is accurate, besides being logically capable of providing an answer to the research question. Compared to the three other traditional aspects of research validity (external validity, internal validity, and construct validity), interest in SCV has recently grown on evidence that inadequate data analyses are sometimes carried out which yield conclusions that a proper analysis of the data would not have supported. This paper discusses evidence of three common threats to SCV that arise from widespread recommendations or practices in data analysis, namely, the use of repeated testing and optional stopping without control of Type-I error rates, the recommendation to check the assumptions of statistical tests, and the use of regression whenever a bivariate relation or the equivalence between two variables is studied. For each of these threats, examples are presented and alternative practices that safeguard SCV are discussed. Educational and editorial changes that may improve the SCV of published research are also discussed. PMID:22952465

  4. Conclusions from the Image Analysis of the VSOP Survey

    NASA Astrophysics Data System (ADS)

    Dodson, R.; Fomalont, E.; Wiik, K.

    2009-08-01

    In February 1997, the Japanese radio astronomy satellite HALCA was launched to provide the space-bourne element for the VLBI Space Observatory Programme (VSOP) mission. A significant fraction of the mission time was to be dedicated to the VSOP Survey of bright compact Active Galactic Nuclei (AGN) at 5 GHz, which was lead by ISAS. The VSOP Survey Sources are an unbiased dataset of 294 targets, of which 82% were successfully observed. These are now undergoing statistical analysis to tease out the characteristics of typical AGN sources. We present here the summary of the imaging and conclusions we have reached.

  5. The Evidence and Conclusion Ontology (ECO): Supporting GO Annotations.

    PubMed

    Chibucos, Marcus C; Siegele, Deborah A; Hu, James C; Giglio, Michelle

    2017-01-01

    The Evidence and Conclusion Ontology (ECO) is a community resource for describing the various types of evidence that are generated during the course of a scientific study and which are typically used to support assertions made by researchers. ECO describes multiple evidence types, including evidence resulting from experimental (i.e., wet lab) techniques, evidence arising from computational methods, statements made by authors (whether or not supported by evidence), and inferences drawn by researchers curating the literature. In addition to summarizing the evidence that supports a particular assertion, ECO also offers a means to document whether a computer or a human performed the process of making the annotation. Incorporating ECO into an annotation system makes it possible to leverage the structure of the ontology such that associated data can be grouped hierarchically, users can select data associated with particular evidence types, and quality control pipelines can be optimized. Today, over 30 resources, including the Gene Ontology, use the Evidence and Conclusion Ontology to represent both evidence and how annotations are made.

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  7. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  8. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  9. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  10. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  11. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  12. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  13. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  14. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  15. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  16. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  17. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  18. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  19. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  20. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  1. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  2. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  3. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  4. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  5. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  7. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  8. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  9. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  10. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  11. Financial Institutions on DoD Installations

    DTIC Science & Technology

    1989-07-26

    Instructions 1000.10 and 1000.12 (references (b) and (c)). 5 4. Military disbursing offices, nonappropriated fund instrumentalities , and other DoD installation...offices, Agencies, and Departments performing functions on a DoD installation (including nonappropriated fund instrumentalities ); and their

  12. MSFC inspections of installed polyimide wire

    NASA Technical Reports Server (NTRS)

    Landers, Joe C.

    1994-01-01

    An alert was issued because of the arc-tracking possibilities of installed polyimide wire harnesses. MSFC undertook a program to try to enhance the safety and reliability of these harnesses. Photographs are presented showing the need for inspections of installed wiring harnesses.

  13. Noise control at washery plants and installations

    SciTech Connect

    Fore, J.; Santamaria, J.

    1980-01-01

    In the last few years a series of acoustic investigations has been conducted at washery plants and installations. Experiments have shown that the noise level in a number of work areas significantly exceeds 90 dB and reaches 100 dB and over in work areas, for example on such equipment as screens. Prolonged work under high noise conditions may result in the appearance of occupational deafness in the operating personnel; the noise practically prevents any communication, simultaneously increasing the hazard and degrading the quality of the work. Conclusions from the studies were: (1) The classifiers and all drops and chutes are a source of severe noise at washeries. (2) Obvious acoustic insulation materials are rubber or plastics, used in place of metal elements or as a coating for them. (3) Solving the problem of selection of these materials depends on consideration of various factors: the characteristics of the products being processed, the heights and angles of drops, the type of classifier, the accuracy of separation and the output of the screening surfaces. (4) The acoustic adsorption characteristics of large buildings not divided by walls, such as modern washeries, are so high that there is no necessity for any acoustic modification of these buildings.

  14. Conclusive quantum steering with superconducting transition-edge sensors

    NASA Astrophysics Data System (ADS)

    Smith, Devin H.; Gillett, Geoff; de Almeida, Marcelo P.; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gerrits, Thomas; Wiseman, Howard M.; Nam, Sae Woo; White, Andrew G.

    2012-01-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date, all experimental tests with single-photon states have relied on post selection, allowing untrusted devices to cheat by hiding unfavourable events in losses. Here we close this 'detection loophole' by combining a highly efficient source of entangled photon pairs with superconducting transition-edge sensors. We achieve an unprecedented ~62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 s.d.s. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  15. Conclusive quantum steering with superconducting transition edge sensors

    NASA Astrophysics Data System (ADS)

    de Almeida, Marcelo P.; Smith, Devin H.; Gillett, Geo; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gertis, Thomas; Nam, Sae Woo; White, Andrew G.

    2012-02-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date all experimental tests with single photon states have relied on post-selection, allowing untrusted devices to cheat by hiding unfavorable events in losses. Here we close this ``detection loophole'' by combining a highly efficient source of entangled photon pairs with superconducting transition edge sensors. We achieve an unprecedented ˜62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 standard deviations. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  16. The no conclusion intervention for couples in conflict.

    PubMed

    Migerode, Lieven

    2014-07-01

    Dealing with difference is central to all couple therapy. This article presents an intervention designed to assist couples in handling conflict. Central to this approach is the acceptance that most conflicts cannot be solved. Couples are in need of a different understanding of couples conflict. This understanding is found in the analysis of love in context and in relational dialectics. Couples are guided through different steps: deciding on the valence of the issue as individuals, helping them decide which differences can be resolved and which issues demand new ways of living with the inevitable, and the introduction in the suggested no conclusion dialogue. This article briefly describes the five day intensive couple therapy program, in which the no intervention is embedded. The theoretical foundation of the intervention, followed by the step by step description of the intervention forms the major part of the article. A case vignette illustrates this approach.

  17. Equipment qualification risk scoping analyses: Results and conclusions

    SciTech Connect

    Bustard, L.D.; Kolaczkowski, A.M.

    1989-01-01

    Probabilistic risk assessment (PRA) techniques and insights have been employed during an investigation entitled the Equipment Qualification (EQ)-Risk Scoping Study to assess the risk significance of equipment qualification issues. This approach for evaluating EQ issues suggests that some issues are not risk significant while some have a significant potential to increase risk. For example, EQ issues associated with long term accident equipment operability are not risk significant. Alternatively, there are selected system operations that require equipment not qualified for important accident environments. Though the study demonstrated that PRA does provide insights that modify perceptions regarding the importance of various EQ issues, it should be noted that PRA methods currently cannot define the risk significance for some EQ issues. Additional discussion regarding the study's results and conclusions is provided. 6 refs.

  18. Differences between evolution of Titan's and Earth's rivers - further conclusions

    NASA Astrophysics Data System (ADS)

    Misiura, Katarzyna; Czechowski, Leszek

    2014-05-01

    Titan is the only celestial body, beside the Earth, where liquid is present on the surface. Liquid forms a number of lakes and rivers. In our research we use numerical model of the river to determine differences of evolution of rivers on the Earth and on Titan. We have found that transport of sediments on Titan is more effective than on Earth for the same river geometry and discharge. We have found also the theoretical explanations for this conclusion. 2.Introduction Titan is a very special body in the Solar System. It is the only moon that has dense atmosphere and flowing liquid on its surface. The Cassini-Huygens mission has found on Titan meandering rivers, and indicated processes of erosion, transport of solid material and its sedimentation. This paper is aimed to investigate the similarity and differences between these processes on Titan and the Earth. 3. Basic equations of our model The dynamical analysis of the considered rivers is performed using the package CCHE modified for the specific conditions on Titan. The package is based on the Navier-Stokes equations for depth-integrated two dimensional, turbulent flow and three dimensional convection-diffusion equation of sediment transport. 4. Parameters of the model We considered our model for a few kinds of liquid found on Titan. The liquid that falls as a rain (75% methane, 25% nitrogen) has different properties than the fluid forming lakes (74% ethane, 10% methane, 7% propane, 8.5% butane, 0.5% nitrogen). Other parameters of our model are: inflow discharge, outflow level, grain size of sediments etc. For every calculation performed for Titan's river similar calculations are performed for terrestrial ones. 5. Results and Conclusions The results of our simulation show the differences in behaviour of the flow and of sedimentation on Titan and on the Earth. Our preliminary results indicate that transport of material by Titan's rivers is more efficient than by terrestrial rivers of the same geometry parameters

  19. Employee counseling services evaluation system: design, issues and conclusions.

    PubMed

    Masi, D A; Teems, L A

    1983-01-01

    Employee Counseling Services (ECS) programs have emerged as an effective method for dealing with employees whose job performance has deteriorated due to personal problems such as alcoholism or drug abuse. It is estimated that 18% of any work force is effected by such problems at any given time and that these employees cost industry billions of dollars annually in lost productivity, abuse of sick leave, etc. One of the critical concerns of this emerging field is the need for comprehensive evaluation that can demonstrate the cost-effectiveness and cost-benefits of ECS programs. This paper will describe the model Federal ECS developed at the U.S. Department of Health and Human Services as well as the components of the evaluation system designed to determine its effectiveness. The system is the first of its kind and will be a valuable contribution to the field. The paper then raises issues and develops conclusions about designing such an evaluation within the context of a large bureaucracy.

  20. The sandflat habitat: Scaling from experiments to conclusions

    USGS Publications Warehouse

    Thrush, S.F.; Pridmore, R.D.; Bell, R.G.; Cummings, V.J.; Dayton, P.K.; Ford, R.; Grant, J.; Green, M.O.; Hewitt, J.E.; Hines, A.H.; Hume, T.M.; Lawrie, S.M.; Legendre, P.; McArdle, B.H.; Morrisey, D.; Schneider, Davod C.; Turner, S.J.; Walters, R.A.; Whitlatch, R.B.; Wilkinson, M.R.

    1997-01-01

    Ecological systems are characterised by spatial and temporal variations in the density of organisms and resources, and in the intensity of processes which affect them (e.g. Watt, 1947, Dayton, 1971, Addicot et al., 1987, Kolasa and Pickett, 1991 and Giller et al., 1994). This heterogeneity represents both a difficulty for field study design and statistical testing, and a challenge to describe the spatial structuring of populations, communities and ecosystems (Legendre, 1993). Patterns in ecological and environmental variables are fundamental to developing hypotheses and in designing subsequent field studies, because they determine the spatial and temporal scales of study. Spatial and/or temporal patterns also provide useful stepping stones for addressing issues of scale. Patterns apparent at one scale can collapse to noise when viewed from other scales, indicating that patterns, processes and our perceptions vary in a scale-dependent manner. Perhaps the most important but rarely discussed issue is the question of how to scale-up from small-scale surveys and experiments to conclusions relevant at larger spatial and temporal scales.

  1. Collaborative Automation Reliably Remediating Erroneous Conclusion Threats (CARRECT)

    PubMed Central

    Lansey, Jonathan C.; Picciano, Paul; Yohai, Ian; Grant, Fred; Gern, Robert

    2013-01-01

    Objective The objective of the CARRECT software is to make cutting edge statistical methods for reducing bias in epidemiological studies easy to use and useful for both novice and expert users. Introduction Analyses produced by epidemiologists and public health practitioners are susceptible to bias from a number of sources including missing data, confounding variables, and statistical model selection. It often requires a great deal of expertise to understand and apply the multitude of tests, corrections, and selection rules, and these tasks can be time-consuming and burdensome. To address this challenge, Aptima began development of CARRECT, the Collaborative Automation Reliably Remediating Erroneous Conclusion Threats system. When complete, CARRECT will provide an expert system that can be embedded in an analyst’s workflow. CARRECT will support statistical bias reduction and improved analyses and decision making by engaging the user in a collaborative process in which the technology is transparent to the analyst. Methods Older approaches to imputing missing data, including mean imputation and single imputation regression methods, have steadily given way to a class of methods known as “multiple imputation” (hereafter “MI”; Rubin 1987). Rather than making the restrictive assumption that the data are missing completely at random (MCAR), MI typically assumes the data are missing at random (MAR). There are two key innovations behind MI. First, the observed values can be useful in predicting the missing cells, and thus specifying a joint distribution of the data is the first step in implementing the models. Second, single imputation methods will likely fail not only because of the inherent uncertainty in the missing values but also because of the estimation uncertainty associated with generating the parameters in the imputation procedure itself. By contrast, drawing the missing values multiple times, thereby generating m complete datasets along with the

  2. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  3. Debarment: A Guide for Installation Commanders

    DTIC Science & Technology

    2001-04-01

    U.S. v. May, et. al., 622 F.2d 1000 (1980), for the proposition that commanders —bar“ individuals from base, but see, Flower v. United States, 407 U.S...installations by order of the installation commander. In Flower v. United States,30 the Supreme Court began to clarify it‘s holding in McElroy, and...articulate the parameters within which an installation commander can operate in protecting assets and people under his command. In Flower , the Supreme

  4. Spectroscopy of asteroid pairs - new observations support previous conclusions

    NASA Astrophysics Data System (ADS)

    Polishook, David; Oszkiewicz, Dagmara Anna; None Kwiatkowski, Tomasz

    2015-08-01

    Asteroid pairs were split due to fast rotation of a strengthless body. Study them can reveal fundamental principles in asteroid interiors and evolution. We continue our spectroscopic survey of asteroid pairs in the near-IR range (IRTF) and work on completing the spectral coverage in the visible wavelength (SALT, NOT).Our new observations support our previous conclusions (Polishook et al. 2014):1. Primary and secondary members have very similar reflectance spectra supporting the claim that every pair originated from a single progenitor. We measured 2 more pairs that present the same taxonomy (4905-7813, 15107-291188). This increases to 22 the number of asteroid pairs with spectral similarities and supports the claim of a single progenitor for each pair to a significance of over 5 sigma.2. Rotational fission is not a function of the asteroid composition rather the asteroid’s structure. We present new reflectance spectra of S- and C-complex pairs that differ in their composition.3. Some asteroid pairs present spectral parameters that imply a fresh, non-weathered surface. This includes spectral slope, and a deep and wide absorption band at 1 micron. Among these, the asteroid 8306 can now be re-classified as a Q-type asteroid, a common class in the near-Earth environment, but rare in the main belt. 8306 is the 4th Q-type discovered within asteroid pairs (all locate in the main belt).4. A secondary member of an asteroid pair composed of ordinary chondrite (S-complex) might present a reflectance spectrum with lower spectral slope compared to its primary member. This is seen in the new measured reflectance spectrum of secondary 291188). This result supports the theory of Jacobson & Scheeres (2011) of continuous disintegration of the secondaries while still in the vicinity of their primaries.5. With time, the fresh surface becomes weathered. Dynamical calculations limit the disintegration time of the progenitor of the pair 4905-7813 to 1.65 millions years ago, what makes

  5. Cosmological Gamma-Ray Bursts and Hypernovae Conclusively Linked

    NASA Astrophysics Data System (ADS)

    2003-06-01

    Clearest-Ever Evidence from VLT Spectra of Powerful Event Summary A very bright burst of gamma-rays was observed on March 29, 2003 by NASA's High Energy Transient Explorer (HETE-II) , in a sky region within the constellation Leo. Within 90 min, a new, very bright light source (the "optical afterglow") was detected in the same direction by means of a 40-inch telescope at the Siding Spring Observatory (Australia) and also in Japan. The gamma-ray burst was designated GRB 030329 , according to the date. And within 24 hours, a first, very detailed spectrum of this new object was obtained by the UVES high-dispersion spectrograph on the 8.2-m VLT KUEYEN telescope at the ESO Paranal Observatory (Chile). It allowed to determine the distance as about 2,650 million light-years (redshift 0.1685). Continued observations with the FORS1 and FORS2 multi-mode instruments on the VLT during the following month allowed an international team of astronomers [1] to document in unprecedented detail the changes in the spectrum of the optical afterglow of this gamma-ray burst . Their detailed report appears in the June 19 issue of the research journal "Nature". The spectra show the gradual and clear emergence of a supernova spectrum of the most energetic class known, a "hypernova" . This is caused by the explosion of a very heavy star - presumably over 25 times heavier than the Sun. The measured expansion velocity (in excess of 30,000 km/sec) and the total energy released were exceptionally high, even within the elect hypernova class. From a comparison with more nearby hypernovae, the astronomers are able to fix with good accuracy the moment of the stellar explosion. It turns out to be within an interval of plus/minus two days of the gamma-ray burst. This unique conclusion provides compelling evidence that the two events are directly connected. These observations therefore indicate a common physical process behind the hypernova explosion and the associated emission of strong gamma

  6. FORCAST Camera Installed on SOFIA Telescope

    NASA Video Gallery

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  7. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  8. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., unless the CFO determines that a longer period is required. Installment payments of less than $50 per... interest of the United States, paying special attention to applicable statutes of limitations....

  9. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... determines that a longer period is required. Installment payments of less than $50 per month generally will... accordance with the best interest of the United States, paying special attention to applicable statutes...

  10. Hydrogen isotope separation installation for tritium facility

    SciTech Connect

    Andreev, B.M.; Perevezentsev, A.N.; Selivanenko, I.L.; Tenyaev, B.N.; Vedeneev, A.I.; Golubkov, A.N.

    1995-10-01

    The separation of hydrogen isotopes in the hydrogen-palladium system in sectioned separation columns with the simulation of counter-current isotopic exchange is described. The separation efficiency of sectioned columns is investigated with the experimental installation as a function of various parameters. The separation of deuterium-tritium mixtures with high tritium concentrations is tested with the pilot installation operating at room temperature and atmospheric hydrogen pressure. Due to very high separation efficiency, flexibility and simplicity of operation separation installations with sectioned columns are ideally suitable for tritium laboratories and facilities dealing with separation of hydrogen isotopes. Estimation of applicability of sectioned columns for regeneration of exhaust gas in a fuel cycle of thermonuclear reactors, such as JET and ITER, shows the number of advantages of separation installations with sectioned columns. 12 refs., 3 figs., 2 tabs.

  11. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  12. Concentrating solar collector-installation package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Report contains general description of concentrating solar collector and tracking system kit, along with comprehensive drawings, instructions, and guidelines to assist in field assembly, installation, operation, and maintenance of system.

  13. Space Station Live: Installing the AMS

    NASA Video Gallery

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  14. EPA RE-Powering Mapper Completed Installations

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.

  15. The Alaska earthquake, March 27, 1964: lessons and conclusions

    USGS Publications Warehouse

    Eckel, Edwin B.

    1970-01-01

    local waves. Better earthquake-hazard maps, based on improved knowledge of regional geology, fault behavior, and earthquake mechanisms, are needed for the entire country. Their preparation will require the close collaboration of engineers, seismologists, and geologists. Geologic maps of all inhabited places in earthquake-prone parts of the country are also needed by city planners and others, because the direct relationship between local geology and potential earthquake damage is now well understood. Improved and enlarged nets of earthquake-sensing instruments, sited in relation to known geology, are needed, as are many more geodetic and hydrographic measurements. Every large earthquake, wherever located, should be regarded as a full-scale laboratory experiment whose study can give scientific and engineering information unobtainable from any other source. Plans must be made before the event to insure staffing, funding, and coordination of effort for the scientific and engineering study of future earthquakes. Advice of earth scientists and engineers should be used in the decision-making processes involved in reconstruction after any future disastrous earthquake, as was done after the Alaska earthquake. The volume closes with a selected bibliography and a comprehensive index to the entire series of U.S. Geological Survey Professional Papers 541-546. This is the last in a series of six reports that the U.S. Geological Survey published on the results of a comprehensive geologic study that began, as a reconnaissance survey, within 24 hours after the March 27, 1964, Magnitude 9.2 Great Alaska Earthquake and extended, as detailed investigations, through several field seasons. The 1964 Great Alaska earthquake was the largest earthquake in the U.S. since 1700. Professional Paper 546, in 1 part, describes Lessons and Conclusions.

  16. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Installation and details. 32.45-1 Section...

  17. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2011-10-01 2011-10-01 false Installation and details. 32.45-1 Section...

  18. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  19. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  20. Extending Installation Sustainability Beyond the Fenceline

    DTIC Science & Technology

    2010-06-01

    Office of the Assistant Secretary of the Army (Installations and Environment) DoD Executive Agent Extending Installation Sustainability Beyond...Technology Transition – Supporting DoD Readiness, Sustainability , and the Warfighter Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010

  1. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  2. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  3. Fort Knox, KY Containment Berm Unit Installation

    DTIC Science & Technology

    2013-02-01

    Equipment coordinat- ed for berm installation included: a fork lift, bobcat , backhoe, and dump trucks. 2.2 Containment Berm Unit Installation...600.00 Supervisor 6 $ 75.00 $ 450.00 Bobcat 1 $ 2,000.00 $ 2,000.00 Backhoe 1 $ 2,000.00 $ 2,000.00... bobcat to ensure that air pockets were removed. Following compaction, the berm was regraded to conform to the contours of the range and make it

  4. Cathodic protection installation for underground storage tanks

    SciTech Connect

    Koszewski, L.

    1995-12-31

    The 1998 deadline is fast approaching for upgrading Underground Storage Tanks (USTs) with cathodic protection. With so many tanks requiring upgrades over the next few years, tank owners and operators will likely find a shrinking pool of quality cathodic protection installation contractors to perform the necessary upgrading. The proper installation of cathodic protection components is critical to long term effective operation of the cathodic protection system.

  5. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  6. 40 CFR 92.511 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... locomotives: installation audit requirements. (a) Remanufacturers of locomotives or locomotive engines shall...: installation audit requirements. 92.511 Section 92.511 Protection of Environment ENVIRONMENTAL PROTECTION..., component settings and component installations on randomly chosen locomotives in an engine family....

  7. Development of a coiled tubing cable installation system

    SciTech Connect

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  8. An Analysis of Messages About Tobacco in Military Installation Newspapers

    PubMed Central

    Haddock, C. Keith; Parker, L. Carrie; Taylor, Jennifer E.; Poston, Walker S.C.; Lando, Harry; Talcott, G. Wayne

    2005-01-01

    Objectives. We sought to gauge the relative attention that tobacco control receives in military newspapers by comparing coverage of tobacco use with that of other health topics of importance to the military. Methods. We examined tobacco-related articles and industry advertisements in 793 newspapers published during 1 year at 16 representative military installations (4 Air Force, 6 Army, 2 Marine, 4 Navy). Newspaper content was coded with a standardized coding manual developed through previous research. Results. Tobacco use received the fewest instances of coverage and the least print space in military installation newspapers of all the health topics examined. The primary “message frame” used in tobacco control articles was that smokers are putting themselves at health risk, a theme that has not been found to have a strong effect on smokers. Nearly 10% of the newspapers contained tobacco advertisements. Conclusions. Tobacco control messages are underrepresented in military installation newspapers compared with other health issues. Furthermore, military newspapers send mixed messages to military personnel by providing advertisements for tobacco while also claiming that tobacco use is harmful. PMID:16043672

  9. VERA 3.5 Installation Guide

    SciTech Connect

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  10. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  11. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  12. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  13. Anticipating Climate Change Impacts on Army Installations

    DTIC Science & Technology

    2011-10-01

    0.220 –5.6 Sharpe General Depot (Field Annex) 0.185 4.7 Anniston Army Depot –0.181 –4.6 It is interesting that those installations in the Canadian...Fort Gordon –15.84 –8.8 Anniston Army Depot –15.48 –8.6 Figure 29. In the globalized rapid economic growth scenario for the Canadian Model, the...Reservation -10.80 -6.0 Hunter Army Airfield -9.36 -5.2 Fort Gordon -8.82 -4.9 Anniston Army Depot -7.92 -4.4 The southeastern installations still indicate

  14. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  15. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  16. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section...

  17. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2013-10-01 2013-10-01 false Gasoline engine installations. 58.10-5 Section...

  18. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2011-10-01 2011-10-01 false Gasoline engine installations. 58.10-5 Section...

  19. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2010-10-01 2010-10-01 false Gasoline engine installations. 58.10-5 Section...

  20. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2014-10-01 2014-10-01 false Gasoline engine installations. 58.10-5 Section...

  1. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section...

  2. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2012-10-01 2012-10-01 false Gasoline engine installations. 58.10-5 Section...

  3. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section...

  4. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section...

  5. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section...

  6. 47 CFR 1.30003 - Installations on an AM antenna.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Installations on an AM antenna. 1.30003 Section... Random Selection Disturbance of AM Broadcast Station Antenna Patterns § 1.30003 Installations on an AM antenna. (a) Installations on a nondirectional AM tower. When antennas are installed on a...

  7. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  8. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  9. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  10. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  11. 40 CFR 1036.130 - Installation instructions for vehicle manufacturers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Related Requirements § 1036.130 Installation instructions for vehicle manufacturers. (a) If... vehicle, as described in 40 CFR 1068.105.” (c) You do not need installation instructions for engines that... ensure that each installer is informed of the installation requirements....

  12. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  13. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  14. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary...

  15. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  16. 5 CFR 831.1807 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Installment withholdings. 831.1807 Section 831.1807 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Agency Requests to OPM for Recovery of a Debt from the Civil...

  17. 5 CFR 845.407 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 845.407 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES RETIREMENT SYSTEM-DEBT COLLECTION Agency Requests to OPM for Recovery of a Debt From the Civil Service Retirement Fund § 845.407 Installment withholdings. (a) When possible, OPM...

  18. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.271 Section 171.271 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System...

  19. OSM's cone design and installation experience

    SciTech Connect

    Van Dyke, M.W.

    1983-06-29

    The concrete filled steel cone offers an alternative solution in sealing vertical mine shafts. This paper gives the design and installation experiences of the Office of Surface Mining when dealing with abandoned coal mines. This same solution can also be used with other types of shaft closures. 4 figures.

  20. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  1. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  2. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  3. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  4. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  5. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  6. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  7. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  8. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  9. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  10. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  11. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  12. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  13. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  14. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  15. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  16. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  17. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  18. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  19. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  20. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  1. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  2. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  3. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  4. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  5. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  6. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  7. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  8. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  9. Door Hardware and Installations; Carpentry: 901894.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  10. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  11. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  12. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  13. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  14. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  15. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  16. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  17. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  18. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  19. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  20. D0 Cryo CC Heater Installation

    SciTech Connect

    Urbin, J.; /Fermilab

    1991-03-16

    Nine pairs of heaters are installed in the bottom of the CC pressure vessel.The physical layout is shown in the CC internal development drawing, D0 dwg. 3740.510-ME-255523. Electrically the heater system is a delta configuration. Electrical details are found on D0 dwg. 3740.515EC-273761. The feedthrough connectors for power to the heaters are located in the instrumentation box. Connector positions are found on D0 dwg.3740.515-EC-273760. Original sketches for the above named drawings are included in this document. The heaters and wiring were cleaned various times prior to and after installation with ethyl a1chohol. At various stages in the installation hi-pot and continuity tests were successfully accomplished to verify the integrity of the system. The fmal hi-pot numbers are included in the documentation. The heaters and wiring are kept separated from thermometry and purity cell wiring by SS sheetmetal barriers. The fabrication, testing and installation was completed by M. Hentges and his crew from AD/Cryo.

  1. Electron circuits: Semiconductor laser multiple use installation

    NASA Astrophysics Data System (ADS)

    Zhou, F.; Fan, J.; Weng, D.

    1983-04-01

    A light source for a multiple use installation using a same matter junction or different matter junction GaAlAs/GaAs semiconductor laser, which has the advantages of high interference resistance, long transmission distance (tens to hundreds of meters), good security, and low power consumption; in addition, the controller of the light source has multiple usages of alarming, switching and counting is presented. The multiple use installation can be used in control of breaking warps and counting on roving waste machines, warping machines and silk weaving machines in the textile industry; long distance speed measurement, alarming and counting in machinery, electricity and chemical industries; and alarming and control of water levels in reservoirs, rivers and water towers, as well as blockade alarming and control of important divisions. This multiple use installation is composed of two parts a laser emitter and a receiving device. The former component is used to produce the laser; after the receiver receives the laser, the installation completes operations of alarming, switching and counting.

  2. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  3. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  4. Portable off shore well installation apparatus

    SciTech Connect

    Grace, F.J.

    1983-02-15

    A portable off shore well installation apparatus, particularly for off shore wells, utilizing a pollution control curtain surrounding drilling equipment between the surface of the water and a well head, such curtain comprising a submerged anchor ring having secured to the top thereof an axially extendable water impermeable sleeve secured at its lower end to the top of the submerged anchor ring, a float ring secured to the upper end of the extendable sleeve, a plurality of longitudinally spaced buoyant rings attached at suitable intervals about the periphery of the sleeve to provide uniform axial extension of the sleeve, and a fillable retriever ring secured to the lower portion of the anchor ring to facilitate installation and removal of the curtain from the well site when the retriever ring is filled with a buoyant substance.

  5. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  6. A General Purpose High Performance Linux Installation Infrastructure

    SciTech Connect

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.

  7. Mobilization Handbook for Installation Manpower Planners

    DTIC Science & Technology

    1989-06-01

    Manpower Mobilization Planning ," and as a supplement to policy guidance contained in DoD Directive .40j.31, "Mobilization Management of the DoD Civilian...Work Force." It’s purpose is to help reinforce mobilization readiness by providing a planning reference guide for Continental United States (CONUS...installations of the Department of Defense (DoD). It is designed to assist local manpower and personnel planners in anticipating and planning the

  8. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  9. Evolution of the Installation Management Command

    DTIC Science & Technology

    2007-03-30

    USAWC STRATEGY RESEARCH PROJECT THE EVOLUTION OF THE INSTALLATION MANAGEMENT COMMAND by Ms. Betty J. Sumpter...Association of Colleges and Schools, 3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional...collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 30 MAR 2007 2. REPORT TYPE Strategy Research

  10. Installation of a Roof Mounted Photovoltaic System

    NASA Astrophysics Data System (ADS)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  11. Water Loss Control for Military Installations

    DTIC Science & Technology

    2011-05-12

    US Army Corps of Engineers BUILDING STRONG® Water Loss Control for Military Installations Richard J. Scholze US Army ERDC-CERL, Champaign, IL...THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 BUILDING STRONG® BUILDING STRONG® BUILDING STRONG® Background...economic and environmental concerns  Preventive maintenance ► Water systems underground, out of sight, out of mind BUILDING STRONG® True Cost of

  12. Neutrino experiments at LSD and ASD installations.

    NASA Astrophysics Data System (ADS)

    Dadykin, V. L.; Khalchukov, F. F.; Korchagin, V. B.; Korchagin, P. V.; Korolkova, E. V.; Malgin, A. S.; Mal'Gin, A. S.; Ryassny, V. G.; Ryasnyj, V. G.; Ryazhskaya, O. G.; Talochkin, V. P.; Yakushev, V. F.; Zatsepin, G. T.; Aglietta, M.; Badino, G.; Bologna, G. F.; Castagnoli, C.; Castellina, A.; Fulgione, W.; Galeotti, P.; Saavedra, O.; Trinchero, G. C.; Vallania, P.; Vernetto, S.

    No candidate for an antineutrino burst from collapsing stars has been observed during more than 4 years of ASD (Artymovsk Scintillation Detector) and 250 days of LSD (Large Scintillation Detector, Mont Blanc) lifetime. The data collected by the LSD installation are used to obtain an upper limit on the flux of atmospheric neutrinos, and to examine the possibility of detecting solar neutrinos and the correlation between their flux and solar activity.

  13. Installation of electric generators on turbine engines

    NASA Technical Reports Server (NTRS)

    Demel, H. F.

    1983-01-01

    The installation of generators on turbine aircraft is discussed. Emphasis is placed on the use of the samarium cobalt generator. Potential advantages of an electric secondary power system at the engine level are listed. The integrated generator and the externally mounted generator are discussed. It is concluded that the integrated generator is best used in turbojet and low bypass ratio engines where there is no easy way of placing generators externally without influencing frontal areas.

  14. Polarization Mode Dispersion of Installed Fibers

    NASA Astrophysics Data System (ADS)

    Brodsky, Misha; Frigo, Nicholas J.; Boroditsky, Misha; Tur, Moshe

    2006-12-01

    Polarization mode dispersion (PMD), a potentially limiting impairment in high-speed long-distance fiber-optic communication systems, refers to the distortion of propagating optical pulses due to random birefringences in an optical system. Because these perturbations (which can be introduced through manufacturing imperfections, cabling stresses, installation procedures, and environmental sensitivities of fiber and other in-line components) are unknowable and continually changing, PMD is unique among optical impairments. This makes PMD both a fascinating research subject and potentially one of the most challenging technical obstacles for future optoelectronic transmission. Mitigation and compensation techniques, proper emulation, and accurate prediction of PMD-induced outage probabilities critically depend on the understanding and modeling of the statistics of PMD in installed links. Using extensive data on buried fibers used in long-haul high-speed links, the authors discuss the proposition that most of the temporal PMD changes that are observed in installed routes arise primarily from a relatively small number of “hot spots” along the route that are exposed to the ambient environment, whereas the buried shielded sections remain largely stable for month-long time periods. It follows that the temporal variations of the differential group delay for any given channel constitute a distinct statistical distribution with its own channel-specific mean value. The impact of these observations on outage statistics is analyzed, and the implications for future optoelectronic fiber-based transmission are discussed.

  15. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  16. 40 CFR 92.511 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ENGINES Manufacturer and Remanufacturer Production Line Testing and Audit Programs § 92.511 Remanufactured locomotives: installation audit requirements. (a) Remanufacturers of locomotives or locomotive engines shall..., component settings and component installations on randomly chosen locomotives in an engine family....

  17. 24 CFR 3280.709 - Installation of appliances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... shall conform to the terms of its listing and the manufacturer's instructions. The installer shall leave... fireplace stove to the manufactured home structure. The installation shall conform to the...

  18. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  19. Energy Integrated Dairy Farm digester and cogeneration system installation

    SciTech Connect

    Ross, C.C.; Walsh, J.L.

    1984-01-01

    Georgia Tech finished in December, 1983 Phase II (system installation and startup) of its four year Energy Integrated Dairy Farm System (EIDFS) program. This paper outlines the selection and installation of the anaerobic digestion and cogeneration components of the EIDFS.

  20. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  1. Installation Contracting Offices - A Time for Change

    DTIC Science & Technology

    1989-03-22

    controls over and provide technical assistance to installation contracting staffs. In a 21 June 1988 memorandum, Dr. J. R. Sculley , ASA(RDA), advised...2. Fred Reed, "Don’t Bank on Procurement Reform," Army Times Washington, 20 March 1989, p. 70. 3. Jay R. Sculley , U.S. Department of the Army...Washington), 20 March 1989, p. 70. 8. Sculley , Jay R., U.S. Department of the Army. Memorandum to Major Army Commander, 21 June 1988. 9. U.S. Army

  2. Method of installing sub-sea templates

    SciTech Connect

    Hampton, J.E.

    1984-03-06

    A subsea template is installed by a method which includes the steps of securing the template in a position beneath the deck of a semi-submersible drilling vessel, moving the semi-submersible drilling vessel to an appropriate offshore site and subsequently lowering the template from the semi-submersible to the sea bed. In addition, at least three anchorage templates may be loaded onto one or both of the pontoons of the semi-submersible drilling vessel at its original position and are subsequently lowered from the pontoons to their respective locations on the sea bed after the semi-submersible has moved to the offshore site.

  3. Jim Walter Resources installs new overland conveyor

    SciTech Connect

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  4. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation traffic codes. 634.25 Section 634... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for...

  5. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation traffic codes. 634.25 Section 634... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for...

  6. 46 CFR 105.25-10 - Cargo pumping installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMERCIAL FISHING VESSELS DISPENSING PETROLEUM PRODUCTS Additional Requirements-When Cargo Tanks Are Installed Below Decks § 105.25-10 Cargo pumping installation. (a) Cargo pumps shall not be installed in the... cargo tanks shall be run directly to the pump, but not through working or crew spaces of vessel....

  7. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  8. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  9. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  10. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  11. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  12. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  13. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  14. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  15. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  16. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  17. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  18. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  19. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  20. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  1. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  2. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  3. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) The installation is forward of the collision bulkhead; or, (2) The installation is integral with the... vents and fills, in the installation are above the deepest load line and all piping components are Schedule 80 or thicker below the deepest load line. (iii) Full penetration welds are employed in...

  4. 46 CFR 56.50-96 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) The installation is forward of the collision bulkhead; or, (2) The installation is integral with the... vents and fills, in the installation are above the deepest load line and all piping components are Schedule 80 or thicker below the deepest load line. (iii) Full penetration welds are employed in...

  5. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  6. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  7. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  8. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  9. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  10. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  11. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  12. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  13. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  14. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  15. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25... codes. (a) Installation or activity commanders will establish a traffic code for operation of motor vehicles on the installation. Commanders in overseas areas will establish a traffic code, under...

  16. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 7 2011-01-01 2011-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  17. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 7 2013-01-01 2013-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  18. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 7 2012-01-01 2012-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  19. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 7 2014-01-01 2014-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  20. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  1. 24 CFR 3286.5 - Overview of installation program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban... Requirements § 3286.5 Overview of installation program. (a) HUD-administered installation program. HUD...

  2. 24 CFR 3286.5 - Overview of installation program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban... Requirements § 3286.5 Overview of installation program. (a) HUD-administered installation program. HUD...

  3. 47 CFR 80.872 - The VHF radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false The VHF radiotelephone installation. 80.872... to Subpart W § 80.872 The VHF radiotelephone installation. The VHF radiotelephone installation includes: (a) A VHF radiotelephone transmitter, (b) A VHF radiotelephone receiver, (c) A power supply,...

  4. 47 CFR 80.872 - The VHF radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false The VHF radiotelephone installation. 80.872... to Subpart W § 80.872 The VHF radiotelephone installation. The VHF radiotelephone installation includes: (a) A VHF radiotelephone transmitter, (b) A VHF radiotelephone receiver, (c) A power supply,...

  5. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  6. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  7. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  8. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  9. 14 CFR 27.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 27.1301 Section... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment General § 27.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function;...

  10. 14 CFR 31.71 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 31.71 Section 31... AIRWORTHINESS STANDARDS: MANNED FREE BALLOONS Equipment § 31.71 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function; (2)...

  11. 14 CFR 29.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 29.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended...

  12. 14 CFR 23.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 23.1301 Section... Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function. (b) Be labeled as to its identification, function, or operating...

  13. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  14. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  15. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  16. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  17. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  18. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  19. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  20. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  1. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  2. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  3. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace Corps agrees to accept payment in installments, it may require a legally enforceable written...

  4. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace Corps agrees to accept payment in installments, it may require a legally enforceable written...

  5. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace Corps agrees to accept payment in installments, it may require a legally enforceable written...

  6. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace Corps agrees to accept payment in installments, it may require a legally enforceable written...

  7. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace Corps agrees to accept payment in installments, it may require a legally enforceable written...

  8. 24 CFR 3285.907 - Manufacturer additions to installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Manufacturer additions to... Optional Information for Manufacturer's Installation Instructions § 3285.907 Manufacturer additions to installation instructions. A manufacturer may include in its installation instructions items that are...

  9. 32 CFR 636.11 - Installation traffic codes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation traffic codes. 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes. In addition to the requirements in § 634.25(d) of this...

  10. 32 CFR 636.11 - Installation traffic codes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation traffic codes. 636.11 Section 636... ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes. In addition to the requirements in § 634.25(d)...

  11. 32 CFR 636.11 - Installation traffic codes

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this...

  12. 32 CFR 636.11 - Installation traffic codes

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this...

  13. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  14. 6 CFR 11.9 - Collection in installments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Collection in installments. 11.9 Section 11.9 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLAIMS § 11.9 Collection in installments. DHS may accept payment of a DHS debt in regular installments, in accordance with the...

  15. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  16. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  17. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  18. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  19. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  20. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  1. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  2. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must...

  3. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must...

  4. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  5. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  6. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  7. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  8. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  9. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  10. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  11. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  12. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  13. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  14. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  15. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  16. 40 CFR 1042.130 - Installation instructions for vessel manufacturers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AND VESSELS Emission Standards and Related Requirements § 1042.130 Installation instructions for... installation instructions”. (2) State: “Failing to follow these instructions when installing a certified engine...) Describe any vessel labeling requirements specified in § 1042.135. (c) You do not need...

  17. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  18. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  19. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    SciTech Connect

    WHITE, W.F.

    1999-12-16

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services.

  20. 49 CFR 192.361 - Service lines: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... millimeters) of cover in streets and roads. However, where an underground structure prevents installation at... buildings. Each underground service line installed below grade through the outer foundation wall of a... at the foundation wall to prevent leakage into the building. (f) Installation of service lines...