Science.gov

Sample records for installations nucleaires conclusions

  1. Sweet Conclusion

    ERIC Educational Resources Information Center

    Shirley, Britt M.; Wooldridge, Barbara Ross; Camp, Kerri M.

    2012-01-01

    Jen Harrington is the owner and pastry chef of Sweet Conclusion, a bakery in Tampa, Florida. Most of Harrington's business comes from baking wedding cakes, but she has been attempting to attract customers to her retail bakery, where she sells cupcakes, pies, ice cream, and coffee. Nearly four years she opened Sweet Conclusion, the retail part of…

  2. Clues to Conclusions

    ERIC Educational Resources Information Center

    Soloway, Rhoda K.

    1978-01-01

    To help students learn how to interpret, infer, and speculate on conclusions, here is a week-long learning activity on "clue finding". A mitten, a bagful of debris and a few intriguing exercises with descriptive paragraphs show students that they use clues every day to draw conclusions and that they can extend this ability to analyze what they…

  3. Beginning without a Conclusion.

    ERIC Educational Resources Information Center

    Frazier, Richard

    1988-01-01

    Describes a series of activities without conclusions to introduce scientific reasoning in a ninth grade physical science course. Uses popcorn popping to get students to think about the concepts of graphing, histograms, frequency, probability, and scientific methodology. (CW)

  4. Conclusion

    NASA Astrophysics Data System (ADS)

    Thoma, Klaus; Hiller, Daniel; Leismann, Tobias; Drees, Birgit

    Considering the breadth of perspectives in security research among Europeans, as exemplified within this publication, one may certainly note that a tremendous development of this young discipline has occurred in a short period of time. Only three years have passed since the discipline was promoted to an individual theme within the specific programme on `Cooperation' of the European Commission FP7. Since then, a conceptual framework has been established and the first collaborative projects have been executed on different levels, all at an impressive pace. Although the future of security research will remain closely linked to the political will of EU member states, the established base will serve as a solid foundation for the further development of the discipline on a European scale.

  5. Conclusion

    NASA Technical Reports Server (NTRS)

    Arnold, Steven M.; Wong, Terry T.

    2011-01-01

    This compilation of papers in this book represents approximately half of the works discussed at the MS&T 2010 symposium entitled Tools, Models, Databases, and Simulation Tools Developed and Needed to Realize the Vision of Integrated Computational Materials Engineering at Materials Science & Technology wherein five sessions comprised of 33 presentations was organized. The goal of the symposium was two fold To provide a forum in which current state-of-the-art methods for ICME (e.g., information informatics, experimentation, and modeling) could be openly discussed and critiqued by not only materials scientist but also structural engineers/researchers, component designers, industrial leaders and government program managers. To leave the symposium and in particular the panel discussion with a clear idea of the gaps and barriers (both technical, cultural and economical) that must be addressed in order for ICME to fully succeed. The organizers felt that these goals were met, as particularly evident by the standing room only attendance during a lively panel discussion session at the end of the Symposium. However it is the firm belief of the editors of this book that this symposium was merely a start in the right direction, and that subsequent conferences/symposium (e.g., First World Congress on Integrated Computational Materials Engineering to be held July 10-14, 2011 at Seven Springs Mountain Resort in Pennsylvania) must work hard to ensure that a truly diverse, multidisciplinary, community of researchers and practitioners are present and have ample opportunity for interaction. This will ensure that a proper balance between push and pull disciplines and technologies is maintained so that this emerging focus area, Integrated Computational Materials Engineering (ICME), has the greatest potential for success and impact on "system-level" payoffs. Similarly, a pro-active approach is required to reform historical modes of operation in industry, government and the academic sectors so as to facilitate multidisciplinary collaboration and to clearly articulate the vision and scope of ICME.

  6. Conclusions

    NASA Astrophysics Data System (ADS)

    Ahonen, Pasi; Alahuhta, Petteri; Daskala, Barbara; Delaitre, Sabine; Hert, Paul De; Lindner, Ralf; Maghiros, Ioannis; Moscibroda, Anna; Schreurs, Wim; Verlinden, Michiel

    Some say that an increase in security does not necessarily mean a further encroachment on privacy - indeed, security is necessary to protect personal data and our privacy. Networks must be secure, our personal devices, reliable, dependable and trustworthy. But security is a multifaceted term, with many dimensions. We are of the view that an increase in security most likely will encroach upon our privacy in an ambient intelligence world. Surveillance cameras will continue to proliferate. We assume that, whatever the law is, whatever privacy protections government and business say they honour, our telecommunications, e-mails and Internet usage will be monitored to an increasing degree. The same will be true of our interfaces with the world of ambient intelligence.

  7. Conclusion

    NASA Astrophysics Data System (ADS)

    Ivancevic, Vladimir G.; Reid, Darryn J.

    2015-11-01

    It is often held that things should always be made simple, which presumes that either that they can always be made simple or that all the jetisoned logic doesn't matter anyway. Alledgedly, anything should be explainable so that anyone can understand it. Don't get bogged down in dreary details. It should be effortless for the reader: low-dimensional systems exhibit complex behaviour while high-dimensional systems exhibit simple behaviour (to return to our prolegomonal opening), competition is a universal solution, demand must increase as price falls, and everything under the sun neatly fits a power law. Or so the story goes...

  8. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  9. Conclusions. [hydrogen-based energy

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Conclusions are presented according to general areas of technology with some specific examples of research and technology needs identified. These conclusions provide a base for the future development of detailed program plans and identify research needs that are not being given attention or are not being supported at a sufficient level. Emphasis is placed on hydrogen production and use.

  10. Conclusions and Recommendations. Chapter 37

    NASA Technical Reports Server (NTRS)

    Lamar, John E.; Hummel, Dietrich

    2009-01-01

    This chapter provides a brief wrap-up of the task group report and focuses on the overall conclusions and recommendations for future work for the CAWAPI and VFE-2 facets beyond the task group. The overall conclusion is that the Technology Readiness Level (TRL) of CFD solvers has been improved in predicting the flow-physics of vortex-dominated flows during the work of the task group, by having flight and wind-tunnel data available for comparison. Moreover, like all good scientific studies, this task group has identified flight conditions on the F-16XL airplane or wind-tunnel test conditions for a specific leading-edge radius on the 65 delta-wing model where the TRL still needs to be increased.

  11. Conclusive exclusion of quantum states

    NASA Astrophysics Data System (ADS)

    Bandyopadhyay, Somshubhro; Jain, Rahul; Oppenheim, Jonathan; Perry, Christopher

    2014-02-01

    In the task of quantum state exclusion, we consider a quantum system prepared in a state chosen from a known set. The aim is to perform a measurement on the system which can conclusively rule that a subset of the possible preparation procedures cannot have taken place. We ask what conditions the set of states must obey in order for this to be possible and how well we can complete the task when it is not. The task of quantum state discrimination forms a subclass of this set of problems. Within this paper, we formulate the general problem as a semidefinite program (SDP), enabling us to derive sufficient and necessary conditions for a measurement to be optimal. Furthermore, we obtain a necessary condition on the set of states for exclusion to be achievable with certainty, and we give a construction for a lower bound on the probability of error. This task of conclusively excluding states has gained importance in the context of the foundations of quantum mechanics due to a result from Pusey, Barrett, and Rudolph (PBR). Motivated by this, we use our SDP to derive a bound on how well a class of hidden variable models can perform at a particular task, proving an analog of Tsirelson's bound for the PBR experiment and the optimality of a measurement given by PBR in the process. We also introduce variations of conclusive exclusion, including unambiguous state exclusion, and state exclusion with worst-case error.

  12. [SENTIERI Project: discussion and conclusions].

    PubMed

    Pirastu, Roberta; Ricci, Paolo; Comba, Pietro; Bianchi, Fabrizio; Biggeri, Annibale; Conti, Susanna; Fazzo, Lucia; Forastiere, Francesco; Iavarone, Ivano; Martuzzi, Marco; Musmeci, Loredana; Pasetto, Roberto; Zona, Amerigo; Crocetti, Emanuele

    2014-01-01

    showing the increase, considering latency and the length of the observation period. Of further interest are results relating to diseases of the urinary tract such as kidney failure in the NPCSs of Basso bacino del fiume Chienti, Taranto, Milazzo and Priolo. Overall, the results discussed above are consistent with the previous findings pertaining to mortality for 1995-2002. The present analysis also introduces a new element - the study of cancer incidence and hospital discharges - which can tell us a great deal about diseases with high survival rates or non lethal ones. The first is the case of thyroid cancer, which presents increases in both databases and for both genders in a number of NPCSs (Brescia-Caffaro, Laghi di Mantova, Milazzo, Sassuolo- Scandiano and Taranto). The study of cancer incidence and hospital discharges also revealed cancer excesses for melanoma, breast cancer and non Hodgkin lymphoma in Brescia-Caffaro NPCS where PCBs (Polychlorinated biphenyl) are the site's main pollutant. PCBs, according to the 2013 evaluation of the International Agency for Research on Cancer, are ascertained human carcinogens for melanoma and probable carcinogens for breast cancer and non-Hodgkin lymphoma. The results pertaining to cancer incidence in the 17 NPCSs can also be presented using rankings by area or disease analyzed by a multivariate hierarchical Bayesian model. These rankings reveal an overlapping of credibility intervals, such that it is not possible to speak of a limited number of cancer sites or of certain NPCSs as being particularly affected. Every NPCS, therefore, must be considered individually and ordering them by ranking of cancer incidence wouldn't be appropriate. Data collected concerning some of the NPCSs in the context of the SENTIERI Project is so conclusive that remediation measures can immediately be put in place. This is the case in the Biancavilla and Brescia-Caffaro NPCSs. A similar conclusion can be drawn for complex locations such as Taranto

  13. Hot tap thermowell installation

    NASA Technical Reports Server (NTRS)

    Romero, C. A.

    1971-01-01

    System permits valve housings or other fillings to be installed in live steam lines or water pipes without interrupting their operation, thus eliminating current tapping restrictions. Two basic assemblies for installation under pressure are described.

  14. Solar installer's training program

    SciTech Connect

    Schmidt, W.J.; Philbin, J.

    1981-01-01

    Instructions are given for the installation of solar domestic water heating systems, space heating systems, and pool heating systems. The basic procedures for installing any solar heating system are presented with reference to solar domestic hot water systems, and the space and pool systems are taught on that basis. (LEW)

  15. Advanced turboprop installation aerodynamics

    NASA Technical Reports Server (NTRS)

    Smith, R. C.

    1981-01-01

    The expected aerodynamic effects of a propfan installed on a thick supercritical wing are summarized qualitatively. Nacelle/wing and jet interactions, slipstream incremental velocity, nonuniform inflow, and swirl loss recovery are discussed.

  16. AMS Time Lapse Installation

    NASA Video Gallery

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  17. MUSE dream conclusion: the sky verdict

    NASA Astrophysics Data System (ADS)

    Caillier, P.; Accardo, M.; Adjali, L.; Anwand, H.; Bacon, R.; Boudon, D.; Capoani, L.; Daguisé, E.; Dupieux, M.; Dupuy, C.; Francois, M.; Glindemann, A.; Gojak, D.; Gonté, F.; Haddad, N.; Hansali, G.; Hahn, T.; Jarno, A.; Kelz, A.; Koehler, C.; Kosmalski, J.; Laurent, F.; Larrieu, M.; Lizon, J.-L.; Loupias, M.; Manescau, A.; Migniau, J.-E.; Monstein, C.; Nicklas, H.; Parès, L.; Pécontal-Rousset, A.; Piqueras, L.; Reiss, R.; Remillieux, A.; Renault, E.; Rupprecht, G.; Streicher, O.; Stuik, R.; Valentin, H.; Vernet, J.; Weilbacher, P.; Zins, G.

    2014-08-01

    MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern Observatory). The MUSE project is supported by a European consortium of 7 institutes. After the finalisation of its integration in Europe, the MUSE instrument has been partially dismounted and shipped to the VLT (Very Large Telescope) in Chile. From October 2013 till February 2014, it has then been reassembled, tested and finally installed on the telescope its final home. From there it collects its first photons coming from the outer limit of the visible universe. This critical moment when the instrument finally meets its destiny is the opportunity to look at the overall outcome of the project and the final performance of the instrument on the sky. The instrument which we dreamt of has become reality. Are the dreamt performances there as well? These final instrumental performances are the result of a step by step process of design, manufacturing, assembly, test and integration. Now is also time to review the path opened by the MUSE project. What challenges were faced during those last steps, what strategy, what choices did pay off? What did not?

  18. 4.11 Summary and Conclusions

    NASA Astrophysics Data System (ADS)

    Noßke, D.; Mattsson, S.; Johansson, L.

    This document is part of Subvolume A 'Fundamentals and Data in Radiobiology, Radiation Biophysics, Dosimetry and Medical Radiological Protection' of Volume 7 'Medical Radiological Physics' of Landolt-Börnstein - Group VIII 'Advanced Materials and Technologies'. It contains the Section '4.11 Summary and Conclusions' of the Chapter '4 Dosimetry in Nuclear Medicine Diagnosis and Therapy'.

  19. The TOEFL and Domestic Students: Conclusively Inappropriate

    ERIC Educational Resources Information Center

    Johnson, Dixon C.

    1977-01-01

    This experiment tested college students whose first language is English with the TOEFL examination. The major conclusion was that TOEFL scores do not relate to academic aptitude or performance of domestic students and to evaluate English competency of native speakers with this test is inappropriate. (CHK)

  20. The common premise for uncommon conclusions.

    PubMed

    Coady, C A J

    2013-05-01

    Recent controversy over philosophical advocacy of infanticide (or the comically-styled euphemism 'postnatal abortion') reveals a surprisingly common premise uniting many of the opponents and supporters of the practice. This is the belief that the moral status of the early fetus or embryo with respect to a right to life is identical to that of a newly born or even very young baby. From this premise, infanticidists and strong anti-abortionists draw opposite conclusions, the former that the healthy newly born have no inherent right to life and the latter that minute embryos and the very early fetus have the same right to life as young babies. (Indeed strong anti-abortionists tend to regard this right to life as identical to that possessed by adult humans.) This paper argues that these opposed conclusions are both deeply implausible and that the implausibility resides in the common premise. The argument requires some attention to the structure of the philosophical case underpinning the supposed vice of speciesism that has been given intellectual currency by many philosophers, most notably Peter Singer, and also to the reasoning behind the strong anti-abortionist adoption of the common premise. PMID:23637428

  1. The common premise for uncommon conclusions.

    PubMed

    Coady, C A J

    2013-05-01

    Recent controversy over philosophical advocacy of infanticide (or the comically-styled euphemism 'postnatal abortion') reveals a surprisingly common premise uniting many of the opponents and supporters of the practice. This is the belief that the moral status of the early fetus or embryo with respect to a right to life is identical to that of a newly born or even very young baby. From this premise, infanticidists and strong anti-abortionists draw opposite conclusions, the former that the healthy newly born have no inherent right to life and the latter that minute embryos and the very early fetus have the same right to life as young babies. (Indeed strong anti-abortionists tend to regard this right to life as identical to that possessed by adult humans.) This paper argues that these opposed conclusions are both deeply implausible and that the implausibility resides in the common premise. The argument requires some attention to the structure of the philosophical case underpinning the supposed vice of speciesism that has been given intellectual currency by many philosophers, most notably Peter Singer, and also to the reasoning behind the strong anti-abortionist adoption of the common premise.

  2. Epistemology applied to conclusions of expert reports.

    PubMed

    Lucena-Molina, Jose-Juan

    2016-07-01

    It is believed that to build a robust reasoning logic to make probabilistic inferences in forensic science from a merely mathematical or logistical viewpoint is not enough. Mathematical logic is the positive science of reasoning and as for that it is only interested in the positive calculus of its validity, regardless any prior ontological assumption. But without a determined ontology and epistemology which imply to define the concepts that they will use, it seems difficult that the proposed scientifically correct mathematical solution be successful as a European standard for making conclusions in forensic reports because it has to be based on judicial language. Forensic experts and Courts are not interested in the development of a positive science but in a practical science: in clarifying whether certain known facts are related to a possible crime. Therefore, not only the coherence of the demonstrative logic reasoning used (logic of propositions) is important, but also the precision of the concepts used by language and consistency among them in reasoning (logic of concepts). There is a linguistic level essential for a successful communication between the forensic practitioner and the Court which is mainly related, in our opinion, to semantics and figures of speech. The first one is involved because words used in forensic conclusions often have different meanings - it is said that they are polysemic - and the second one because there is often metonymy as well. Besides, semantic differences among languages regarding words with the same etymological root add another difficulty for a better mutual understanding. The two main European judicial systems inherit a wide and deep culture related to evidence in criminal proceedings and each of them has coined their own terminology but there are other two more abstract levels such as logical and epistemological, where we can find solid arguments by which terms used at legal level on conclusions of forensic reports could be

  3. Epistemology applied to conclusions of expert reports.

    PubMed

    Lucena-Molina, Jose-Juan

    2016-07-01

    It is believed that to build a robust reasoning logic to make probabilistic inferences in forensic science from a merely mathematical or logistical viewpoint is not enough. Mathematical logic is the positive science of reasoning and as for that it is only interested in the positive calculus of its validity, regardless any prior ontological assumption. But without a determined ontology and epistemology which imply to define the concepts that they will use, it seems difficult that the proposed scientifically correct mathematical solution be successful as a European standard for making conclusions in forensic reports because it has to be based on judicial language. Forensic experts and Courts are not interested in the development of a positive science but in a practical science: in clarifying whether certain known facts are related to a possible crime. Therefore, not only the coherence of the demonstrative logic reasoning used (logic of propositions) is important, but also the precision of the concepts used by language and consistency among them in reasoning (logic of concepts). There is a linguistic level essential for a successful communication between the forensic practitioner and the Court which is mainly related, in our opinion, to semantics and figures of speech. The first one is involved because words used in forensic conclusions often have different meanings - it is said that they are polysemic - and the second one because there is often metonymy as well. Besides, semantic differences among languages regarding words with the same etymological root add another difficulty for a better mutual understanding. The two main European judicial systems inherit a wide and deep culture related to evidence in criminal proceedings and each of them has coined their own terminology but there are other two more abstract levels such as logical and epistemological, where we can find solid arguments by which terms used at legal level on conclusions of forensic reports could be

  4. Conclusions from recent pionic--atom experiments

    SciTech Connect

    Gotta, D.; Hennebach, M.; Nekipelov, M.; Strauch, Th.; Amaro, F.; Covita, D. S.; Santos, J. M. F. dos; Veloso, J. F. C. A.; Anagnostopoulos, D. F.; Biri, S.; Gorke, H.; Gruber, A.; Hirtl, A.; Ishiwatari, T.; Marton, J.; Schmid, Ph.; Zmeskal, J.; Indelicato, P.; Jensen, Th.; Le Bigot, E.-O.

    2008-08-08

    The most recent pionic--hydrogen experiment marks the completion of a whole series of measurements, the main goal of which was to provide conclusive data on pion--nucleon interaction at threshold for comparison with calculations from Chiral perturbation theory. The precision achieved for hadronic shift and broadening of 0.2% and 2%, respectively, became possible by comprehensive studies of cascade effects in hydrogen and other light exotic atoms including results from the last years of LEAR operation. In order to obtain optimum conditions for the Bragg crystal spectrometer, the cyclotron trap II has been used to provide a suitable X--ray source. To characterize the bent crystal spectrometer, the cyclotron trap has been modified to operate as an electron--cyclotron resonance source, which produces with high intensity narrow X-ray transitions in the few keV range originating from highly charged ions.

  5. NWCC Transmission Case Study Conclusions Summary

    SciTech Connect

    Steve Wiese, Terry Allison

    2000-09-01

    OAK-B135 The NWCC Transmission Case Studies Conclusions Summary In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC), conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: (1) Transmission policy and pricing; (2) ''Virtual wheeling'' arrangements; and, (3) Transmission system improvements. The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate.

  6. Modular windmill installation

    SciTech Connect

    Black, J.B.

    1982-03-23

    A windmill installation adapted to extract energy from natural wind currents is disclosed wherein a plurality of individual wind wheel modules are stacked vertically in a tower-like structure and are interconnected with one another to operate in a unitary manner. Each module has a rotor assembly which is disengageable from the rotor assemblies of other modules without interrupting the generation of power from the installation. A rotatable windshield is provided about the rotor assembly for improving output efficiency of the wind wheel and protecting the rotor assembly from damage in the event of excessively high wind speeds. The angular position of the windshield is determined by an automatic control system responsive to wind speed and direction.

  7. Mineral mining installation

    SciTech Connect

    Eggenstein, F.; Plester, K.

    1980-10-14

    A mineral mining installation comprises a longwall structure, such as a conveyor or a winning installation, and a roof support assembly constituted by a plurality of roof support units positioned side-by-side. At least some of the roof support units are provided with hydraulic bracing rams for bracing the longwall structure longitudinally. Each bracing ram is pivotally connected between the longwall structure and the floor sill of a respective roof support unit. Each ram is connected to its floor sill by connection means constituted by a bracket slidably mounted on that floor sill for movement towards, and away from, the longwall structure. Means are provided for securing each of the brackets to its floor sill in any one of a plurality of positions.

  8. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  9. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  10. Achieving a quiet rooftop installation

    SciTech Connect

    Harold, R.G.

    1993-12-01

    This article examines the design considerations for quiet roof top installations of air conditioning systems. The topics of the article include the elements of a quiet installation, acoustic design requirements for minimizing noise problems, incorporating system requirements into the overall design of the building, and survival of the system design through bid review and installation.

  11. Rockbolt and installer wand

    SciTech Connect

    Lane, W.L.; Lewis, D.L.

    1987-04-07

    A rockbolt is described for installation in a bore in the roof of an underground excavation to support the roof, the rockbolt comprising: a sleeve insertable into the bore and having an upper and a lower end; at least one port in the sleeve near the upper end; means inside the sleeve near the upper end for engaging a device for supplying hardenable binder material inserted into the sleeve, the engaging means having at least one passage therein communicating with the port to allow binder material to pass from the device through the engaging means and out the port, to encase the sleeve in binder material; means for engaging the sleeve, near the lower end, to the roof face; means for engaging the sleeve near the upper end to the rock surrounding the bore and means for tensioning the rockbolt to compress the rock between the upper and lower ends.

  12. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  13. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  14. Association installs condom machine.

    PubMed

    1994-08-01

    On the occasion of World Population Day (11 July), India installed its first condom vending machine. The machine was inaugurated by Mr. Eruch Lala, an official of the Family Planning Association of India, as part of the association's campaign to help the country curb its rapid population growth rate and stem the spread of AIDS (acquired immune deficiency syndrome). Each condom, called sangam ("union" in English) costs Rupees 2 (about 6.5 US cents). The machine is located at a textile mill in Bombay. The Association said it would install at least 60 such machines in Bombay over the coming months. "A psychological advantage of the machine is that the user need not personally meet the dispenser and can collect a condom without any embarrassment," Mr. Lala said. "The machine is expected to promote efforts at curbing population growth and prevent the spread of AIDS," he said. In a separate report, AIDS has been found to be racing through India just eight years after the first case was detected. Prostitutes, drug addicts and untested blood supplies are the conduits. More than half of the prostitutes in cities such as Bombay have HIV (human immunodeficiency virus), which causes AIDS. The truck drivers and itinerant workers they serve carry it to their own villages, according to the report by Mr. Thomas Wagner writing for the Associated Press. There are 43 million cases of sexually transmitted diseases reported each year in the country, according to the report. The HIV virus has been reported in all 25 states of India. Although the AIDS pandemic came to India later than most large countries, the National AIDS Control Organization estimates there are 1.62 million cases in the population, up 60% from 1993, according to the report. "AIDS is no longer just a problem of high-risk groups; it has spread to every area of India," Dr. P.R. Das Gupta of the national AIDS agency said in an interview. "So many people are migrating from their villages in search of jobs that this

  15. Installing reservoir taps

    SciTech Connect

    Crowe, J.W.

    1988-10-25

    This patent describes a method of installing a tap in a liquid storage tank containing liquid such as water and having a wall, a top and a bottom and a manhole cover in the wall, a method which comprises: placing a dry pot having an open end with a flange and gasket means thereon against the inside of the manhole cover by manipulating the dry pot from within the tank while the tank contains liquid; drilling a pilot hole at about the center of the manhole from the outside while the dry pot is held against the cover; removing the water in the dry pot from the outside thus permitting the hydrostatic pressure within the tank to hold the dry pot in place when the hydrostatic pressure within the dry pot is reduced by removing the water therein; placing a threaded pipe nipple within flange into the hole in the cover; securing the flange of the pipe nipple to the manhole to prevent leakage between the flange and the hole; screwing a threaded tap valve onto the threaded pipe nipple on the outside of the tank and removing the dry pot.

  16. CHP Installed Capacity Optimizer Software

    2004-11-30

    The CHP Installed Capacity Optimizer is a Microsoft Excel spreadsheet application that determines the most economic amount of capacity of distributed generation and thermal utilization equipment (e.g., absorption chillers) to install for any user-defined set of load and cost data. Installing the optimum amount of capacity is critical to the life-cycle economic viability of a distributed generation/cooling heat and power (CHP) application. Using advanced optimization algorithms, the software accesses the loads, utility tariffs, equipment costs,more » etc., and provides to the user the most economic amount of system capacity to install.« less

  17. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  18. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  19. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  20. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be...

  1. 46 CFR 120.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSTALLATION Power Sources and Distribution Systems § 120.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided for each...

  2. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be...

  3. 46 CFR 120.392 - Radiotelephone installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSTALLATION Power Sources and Distribution Systems § 120.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided for each...

  4. 46 CFR 120.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSTALLATION Power Sources and Distribution Systems § 120.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided for each...

  5. 46 CFR 120.392 - Radiotelephone installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSTALLATION Power Sources and Distribution Systems § 120.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided for each...

  6. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be...

  7. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be...

  8. Vessels installed at A-3

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Construction of the A-3 Test Stand approaches another milestone with delivery and installation of water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks. The three LOX tanks shown on the left and the two IPA tanks shown on the right are all 35,000 gallons each. The four water tanks in the center are 39,000 gallons each.

  9. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  10. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  11. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  12. SPI/VMS installation guide

    SciTech Connect

    King, M.E.

    1990-03-12

    This document provides information on how to install SPI/VMS. This product runs on VMS Version 5.1 and above. The SPI.BCK saveset contains all the files necessary to run and compile SPI/VMS. This document assumes that you have a copy of the saveset on a magnetic tape or in a directory on a Files-11 disk.

  13. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  14. Retaining-Ring Installation Tool

    NASA Technical Reports Server (NTRS)

    Christian, S.

    1983-01-01

    New tool eliminates damage to ring through improper tool use. Tool installs spiral-wound retaining rings quickly, reliably, and safely. Tool inserts rings in splined or irregularly shaped bores, bores at bottom of deep ring and slides it along bore until it nests in groove. Pistons are moved by variety of linkages.

  15. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  16. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  17. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  18. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions of law, briefs and...

  19. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  20. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  1. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  2. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  3. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  4. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  5. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 954.18 Section... RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed findings and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions...

  6. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  7. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  8. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  9. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  10. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 954.18 Section... RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed findings and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions...

  11. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 954.18 Section... RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed findings and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions...

  12. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings...

  13. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor....

  14. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 954.18 Section... RELATIVE TO THE DENIAL, SUSPENSION, OR REVOCATION OF PERIODICALS MAIL PRIVILEGES § 954.18 Proposed findings and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions...

  15. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law...

  16. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  17. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided,...

  18. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  19. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting...

  20. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the...

  1. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  2. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  3. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  4. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  5. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation....

  6. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  7. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  8. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  9. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  10. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  11. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  12. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  13. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  14. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage...

  15. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box...

  16. Engineering report for simulated riser installation

    SciTech Connect

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  17. Giant South Brae platform installed

    SciTech Connect

    Cranfield, J.

    1982-12-01

    During the summer 1982 another giant production platform was installed in the North Sea in Marathon's South Brae field. The complex structure of that field necessitated careful planning of the offshore producing structure design and placement. The platform has 46 well slots; 19 will be used as producing wells, 3 for gas injection, and 14 for water injection. The remainder of the well slots are reserved for future development. The platform structure design is examined.

  18. Installing and maintaining evaporative coolers

    SciTech Connect

    Otterbein, R.

    1996-05-01

    In the spring, many people in the western United States will be starting up or replacing evaporative coolers, or buying them for the first time. Proper installation and maintenance of these systems is very important, and recent improvements in the technology change how to best handle these tasks. Topics covered in this article include the following: evaporative cooler types; cooler maintenance; sizing evaporative coolers; A/C Add-on; Blower Orientation and cooler location; increasing air flow. 5 figs.

  19. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COPYRIGHT ARBITRATION ROYALTY PANEL RULES AND PROCEDURES COPYRIGHT ARBITRATION ROYALTY PANEL RULES OF PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions....

  20. On symbolic models for Single-Conclusion Logic of Proofs

    SciTech Connect

    Krupski, Vladimir N

    2011-05-31

    In this paper we define symbolic models for Single-Conclusion Logics of Proofs. We prove the soundness and completeness of these logics with respect to the corresponding classes of symbolic models. We apply the semantic methods developed in this paper to justify the use of terms of single-conclusion logic of proofs as notation for derivations in this logic. Bibliography: 17 titles.

  1. On symbolic models for Single-Conclusion Logic of Proofs

    NASA Astrophysics Data System (ADS)

    Krupski, Vladimir N.

    2011-05-01

    In this paper we define symbolic models for Single-Conclusion Logics of Proofs. We prove the soundness and completeness of these logics with respect to the corresponding classes of symbolic models. We apply the semantic methods developed in this paper to justify the use of terms of single-conclusion logic of proofs as notation for derivations in this logic. Bibliography: 17 titles.

  2. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 10... THE INTERNAL REVENUE SERVICE Rules Applicable to Disciplinary Proceedings § 10.75 Proposed findings... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  3. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 15... EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 15.737-24 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  4. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 10... THE INTERNAL REVENUE SERVICE Rules Applicable to Disciplinary Proceedings § 10.75 Proposed findings... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  5. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 15... EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 15.737-24 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  6. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each... the discretion of the presiding officer such is not appropriate, submit proposed findings of...

  7. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each... the discretion of the presiding officer such is not appropriate, submit proposed findings of...

  8. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 10... THE INTERNAL REVENUE SERVICE Rules Applicable to Disciplinary Proceedings § 10.75 Proposed findings... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  9. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... OF CONDUCT STANDARDS OF CONDUCT Hearing and Related Matters § 458.87 Proposed findings and... findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  10. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  11. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 10... THE INTERNAL REVENUE SERVICE Rules Applicable to Disciplinary Proceedings § 10.75 Proposed findings... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  12. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Proposed findings and... PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions. (a) Any party to the proceeding may file proposed findings of fact and conclusions, briefs, or...

  13. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 15... EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 15.737-24 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  14. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 8... THE BUREAU OF ALCOHOL, TOBACCO AND FIREARMS Disciplinary Proceedings § 8.67 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  15. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... OF CONDUCT STANDARDS OF CONDUCT Hearing and Related Matters § 458.87 Proposed findings and... findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  16. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 8... THE BUREAU OF ALCOHOL, TOBACCO AND FIREARMS Disciplinary Proceedings § 8.67 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  17. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... OF CONDUCT STANDARDS OF CONDUCT Hearing and Related Matters § 458.87 Proposed findings and... findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  18. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... OF CONDUCT STANDARDS OF CONDUCT Hearing and Related Matters § 458.87 Proposed findings and... findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  19. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  20. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except... indicates in the answer that he or she does not desire to appear, may submit proposed findings of...

  1. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 8... THE BUREAU OF ALCOHOL, TOBACCO AND FIREARMS Disciplinary Proceedings § 8.67 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  2. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 8... THE BUREAU OF ALCOHOL, TOBACCO AND FIREARMS Disciplinary Proceedings § 8.67 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  3. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  4. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 15... EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 15.737-24 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  5. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 8... THE BUREAU OF ALCOHOL, TOBACCO AND FIREARMS Disciplinary Proceedings § 8.67 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  6. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... OF CONDUCT STANDARDS OF CONDUCT Hearing and Related Matters § 458.87 Proposed findings and... findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor,...

  7. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except... indicates in the answer that he or she does not desire to appear, may submit proposed findings of...

  8. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 10... THE INTERNAL REVENUE SERVICE Rules Applicable to Disciplinary Proceedings § 10.75 Proposed findings... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge....

  9. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 15... EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 15.737-24 Proposed findings and... afford the parties a reasonable opportunity to submit proposed findings and conclusions and...

  10. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except... indicates in the answer that he or she does not desire to appear, may submit proposed findings of...

  11. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except... indicates in the answer that he or she does not desire to appear, may submit proposed findings of...

  12. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 952.23 Section 952.23 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a)...

  13. Emotion in Painting and Art Installations.

    PubMed

    Konečni, Vladimir J

    2015-01-01

    Paintings are static 2-dimensional images with limited narrative means. On the basis of a critical analysis of the relevant laboratory scaling studies, museum studies, and neuroaesthetic work, the article reaches a negative conclusion about most paintings' ability to engage sufficiently with general viewers' associative-memory systems, so as to lead to identification and empathy, and induce fundamental psychobiological emotions. In contrast, designers of art installations can draw on subtle combinations of several classes of stimulus properties with psychological significance subsumable under the classical concept of the sublime (physical grandeur, rarity, an association with beauty and with biologically significant outcomes), so that some installations may induce the peak aesthetic emotional response, aesthetic awe--as defined in Aesthetic Trinity Theory (Konečni, 2005, 2011), along with the states of being moved and physiological thrills. The approach also involves an analytical skepticism about emotivism, defined as a culturological proclivity for unnecessary insertion of emotion into accounts of mental life and behavior, especially in the arts. Implications for the role of emotion theory in empirical aesthetics are examined.

  14. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  15. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  16. Symbolic Models for Single-Conclusion Proof Logics

    NASA Astrophysics Data System (ADS)

    Krupski, Vladimir N.

    Symbolic semantics for logics of proofs based on Mkrtychev models covers the the case of multi-conclusion proof logics. We propose symbolic models for single-conclusion proof logics (FLP and its extensions). The corresponding soundness and completeness theorems are proven. The developed symbolic model technique is used to establish the consistency of contexts required for proof internalization. In particular, we construct an extension of FLP that enjoys the strong proof internalization property with empty context.

  17. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... installation must be constructed and arranged to— (1) Result in carcass vibration characteristics that do not... the installed engine to withstand the ingestion of rain, hail, ice, and birds into the engine inlet...

  18. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... installation must be constructed and arranged to— (1) Result in carcass vibration characteristics that do not... the installed engine to withstand the ingestion of rain, hail, ice, and birds into the engine inlet...

  19. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... installation must be constructed and arranged to— (1) Result in carcass vibration characteristics that do not... the installed engine to withstand the ingestion of rain, hail, ice, and birds into the engine inlet...

  20. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... installation must be constructed and arranged to— (1) Result in carcass vibration characteristics that do not... the installed engine to withstand the ingestion of rain, hail, ice, and birds into the engine inlet...

  1. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  2. Tools For Installing Keys On A Stud

    NASA Technical Reports Server (NTRS)

    Goodoak, Robert D.

    1995-01-01

    Two tools designed to be used together to drive long locking keys axially to install them on stud. Tools are: supporter holding keys in correct relative alignment and driver having multiple prongs, each of which fits into one of holes in supporter. Tools prevent bending and breaking of keys during installation, and make possible to install all keys simultaneously, in one motion.

  3. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  4. Installation of a materials management system.

    PubMed

    Graves, J; Siewert, B

    1990-04-01

    Installation in five months using existing staff--that's what it took Waukesha Memorial Hospital (WMH) to go from the first installation planning meeting to a fully operational system. This article explains the process WMH followed to install the HBO Materials Management system in five months using in-house staff.

  5. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  6. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  7. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  8. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  9. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  10. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  11. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  12. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  13. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads for main and booster fans, and air ducts connecting main fans to underground openings shall...

  14. 14 CFR 29.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant General § 29.901 Installation. (a) For the purpose of this part, the powerplant installation includes each part of the rotorcraft (other than the main and... differences of potential between major components of the installation and the rest of the rotorcraft....

  15. 14 CFR 29.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant General § 29.901 Installation. (a) For the purpose of this part, the powerplant installation includes each part of the rotorcraft (other than the main and... differences of potential between major components of the installation and the rest of the rotorcraft....

  16. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  17. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  18. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  19. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  20. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  1. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation....

  2. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  3. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  4. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  5. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  6. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of...

  7. Conclusiveness of natural languages and recognition of images

    SciTech Connect

    Wojcik, Z.M.

    1983-01-01

    The conclusiveness is investigated using recognition processes and one-one correspondence between expressions of a natural language and graphs representing events. The graphs, as conceived in psycholinguistics, are obtained as a result of perception processes. It is possible to generate and process the graphs automatically, using computers and then to convert the resulting graphs into expressions of a natural language. Correctness and conclusiveness of the graphs and sentences are investigated using the fundamental condition for events representation processes. Some consequences of the conclusiveness are discussed, e.g. undecidability of arithmetic, human brain assymetry, correctness of statistical calculations and operations research. It is suggested that the group theory should be imposed on mathematical models of any real system. Proof of the fundamental condition is also presented. 14 references.

  8. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS RULES OF PRACTICE GOVERNING PROCEEDINGS UNDER THE NOISE CONTROL ACT OF 1972 Rules of Practice Governing Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  9. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS RULES OF PRACTICE GOVERNING PROCEEDINGS UNDER THE NOISE CONTROL ACT OF 1972 Rules of Practice Governing Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  10. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS RULES OF PRACTICE GOVERNING PROCEEDINGS UNDER THE NOISE CONTROL ACT OF 1972 Rules of Practice Governing Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  11. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS RULES OF PRACTICE GOVERNING PROCEEDINGS UNDER THE NOISE CONTROL ACT OF 1972 Rules of Practice Governing Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  12. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS RULES OF PRACTICE GOVERNING PROCEEDINGS UNDER THE NOISE CONTROL ACT OF 1972 Rules of Practice Governing Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing....

  13. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS (EFF. UNTIL 7-22-2011) § 952.23 Proposed findings and..., unless at the discretion of the presiding officer such is not appropriate, submit proposed findings...

  14. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Proposed findings and conclusions. 901.48 Section 901.48 Employees' Benefits JOINT BOARD FOR THE ENROLLMENT OF ACTUARIES REGULATIONS GOVERNING THE... Law Judge, before making his/her decision, shall give the parties a reasonable opportunity to...

  15. When Proofs Reflect More on Assumptions than Conclusions

    ERIC Educational Resources Information Center

    Dawkins, Paul Christian

    2014-01-01

    This paper demonstrates how questions of "provability" can help students engaged in reinvention of mathematical theory to understand the axiomatic game. While proof demonstrates how conclusions follow from assumptions, "provability" characterizes the dual relation that assumptions are "justified" when they afford…

  16. Hypothesis, Prediction, and Conclusion: Using Nature of Science Terminology Correctly

    ERIC Educational Resources Information Center

    Eastwell, Peter

    2012-01-01

    This paper defines the terms "hypothesis," "prediction," and "conclusion" and shows how to use the terms correctly in scientific investigations in both the school and science education research contexts. The scientific method, or hypothetico-deductive (HD) approach, is described and it is argued that an understanding of the scientific method,…

  17. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... reply briefs must be submitted. All submissions shall be in writing, shall be served upon all...

  18. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... reply briefs must be submitted. All submissions shall be in writing, shall be served upon all...

  19. 39 CFR 912.14 - Conclusiveness of remedy.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... provisions of the Federal Tort Claims Act, shall be final and conclusive on the claimant, his agent, or legal... Postal Service UNITED STATES POSTAL SERVICE PROCEDURES PROCEDURES TO ADJUDICATE CLAIMS FOR PERSONAL INJURY OR PROPERTY DAMAGE ARISING OUT OF THE OPERATION OF THE U.S. POSTAL SERVICE § 912.14...

  20. 39 CFR 912.14 - Conclusiveness of remedy.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... provisions of the Federal Tort Claims Act, shall be final and conclusive on the claimant, his agent, or legal... Postal Service UNITED STATES POSTAL SERVICE PROCEDURES PROCEDURES TO ADJUDICATE CLAIMS FOR PERSONAL INJURY OR PROPERTY DAMAGE ARISING OUT OF THE OPERATION OF THE U.S. POSTAL SERVICE § 912.14...

  1. 39 CFR 912.14 - Conclusiveness of remedy.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... provisions of the Federal Tort Claims Act, shall be final and conclusive on the claimant, his agent, or legal... Postal Service UNITED STATES POSTAL SERVICE PROCEDURES PROCEDURES TO ADJUDICATE CLAIMS FOR PERSONAL INJURY OR PROPERTY DAMAGE ARISING OUT OF THE OPERATION OF THE U.S. POSTAL SERVICE § 912.14...

  2. 39 CFR 912.14 - Conclusiveness of remedy.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... provisions of the Federal Tort Claims Act, shall be final and conclusive on the claimant, his agent, or legal... Postal Service UNITED STATES POSTAL SERVICE PROCEDURES PROCEDURES TO ADJUDICATE CLAIMS FOR PERSONAL INJURY OR PROPERTY DAMAGE ARISING OUT OF THE OPERATION OF THE U.S. POSTAL SERVICE § 912.14...

  3. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 511.46 Section 511.46 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ADJUDICATIVE PROCEDURES Hearings §...

  4. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 511.46 Section 511.46 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ADJUDICATIVE PROCEDURES Hearings §...

  5. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Proposed findings, conclusions and orders. 2700.65 Section 2700.65 Labor Regulations Relating to Labor (Continued) FEDERAL MINE SAFETY AND HEALTH REVIEW... supporting briefs. The proposals shall be served upon all parties, and shall contain adequate references...

  6. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  7. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  8. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  9. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  10. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  11. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  12. Statistical Conclusion Validity: Some Common Threats and Simple Remedies

    PubMed Central

    García-Pérez, Miguel A.

    2012-01-01

    The ultimate goal of research is to produce dependable knowledge or to provide the evidence that may guide practical decisions. Statistical conclusion validity (SCV) holds when the conclusions of a research study are founded on an adequate analysis of the data, generally meaning that adequate statistical methods are used whose small-sample behavior is accurate, besides being logically capable of providing an answer to the research question. Compared to the three other traditional aspects of research validity (external validity, internal validity, and construct validity), interest in SCV has recently grown on evidence that inadequate data analyses are sometimes carried out which yield conclusions that a proper analysis of the data would not have supported. This paper discusses evidence of three common threats to SCV that arise from widespread recommendations or practices in data analysis, namely, the use of repeated testing and optional stopping without control of Type-I error rates, the recommendation to check the assumptions of statistical tests, and the use of regression whenever a bivariate relation or the equivalence between two variables is studied. For each of these threats, examples are presented and alternative practices that safeguard SCV are discussed. Educational and editorial changes that may improve the SCV of published research are also discussed. PMID:22952465

  13. Conclusive identification of quantum channels via monogamy of quantum correlations

    NASA Astrophysics Data System (ADS)

    Kumar, Asutosh; Singha Roy, Sudipto; Pal, Amit Kumar; Prabhu, R.; Sen(De), Aditi; Sen, Ujjwal

    2016-10-01

    We investigate the action of global noise and local channels, namely, amplitude-damping, phase-damping, and depolarizing channels, on monogamy of quantum correlations, such as negativity and quantum discord, in three-qubit systems. We discuss the monotonic and non-monotonic variation, and robustness of the monogamy scores. By using monogamy scores, we propose a two-step protocol to conclusively identify the noise applied to the quantum system, by using generalized Greenberger-Horne-Zeilinger and generalized W states as resource states. We discuss a possible generalization of the results to higher number of parties.

  14. Comparative environmental assessment of unconventional power installations

    NASA Astrophysics Data System (ADS)

    Sosnina, E. N.; Masleeva, O. V.; Kryukov, E. V.

    2015-08-01

    Procedure of the strategic environmental assessment of the power installations operating on the basis of renewable energy sources (RES) was developed and described. This procedure takes into account not only the operational process of the power installation but also the whole life cycles: from the production and distribution of power resources for manufacturing of the power installations to the process of their recovery. Such an approach gives an opportunity to make a more comprehensive assessment of the influence of the power installations on environments and may be used during adaptation of the current regulations and development of new regulations for application of different types of unconventional power installations with due account of the ecological factor. Application of the procedure of the integrated environmental assessment in the context of mini-HPP (Hydro Power Plant); wind, solar, and biogas power installations; and traditional power installation operating natural gas was considered. Comparison of environmental influence revealed advantages of new energy technologies compared to traditional ones. It is shown that solar energy installations hardly pollute the environment during operation, but the negative influence of the mining operations and manufacturing and utilization of the materials used for solar modules is maximum. Biogas power installations are on the second place as concerns the impact on the environment due to the considerable mass of the biogas installation and gas reciprocating engine. The minimum impact on the environment is exerted by the mini-HPP. Consumption of material and energy resources for the production of the traditional power installation is less compared to power installations on RES; however, this factor incomparably increases when taking into account the fuel extraction and transfer. The greatest impact on the environment is exerted by the operational process of the traditional power installations.

  15. High capacity tieback installation method

    SciTech Connect

    Weatherby, D.E.

    1988-01-12

    A method of installing a high capacity tieback is described comprising: connecting a unitary hollow casing to a drill; inserting prestressing steel within the casing; fixing a lost bit to one end of the casing; positioning the drill and casing at the desired location of the tieback; rotating the casing into the ground with the drill and removing soil with a drilling fluid as the casing is advanced into the ground; releasing the bit from the casing and pumping grout down the hollow interior of the casing at a pressure of at least 150 psi forcing water in the grout to bleed from the grout; extracting the casing from the ground by developing a torque of at least 12,000 ft./lbs on the casing with the drill to overcome the frictional engagement between the grout and the casing and by applying a pulling force to the casing generally along the axis of the casing with the drill; and anchoring the prestressing steel.

  16. Case Report: Silicatosis in a Carpet Installer

    PubMed Central

    Szeinuk, Jaime; Wilk-Rivard, Elizabeth J.

    2007-01-01

    Context Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. Case presentation We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Discussion Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Relevance to Clinical or Professional Practice Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung. PMID:17589602

  17. [Outline of political conclusions of multiple regressions: integrants and problems].

    PubMed

    Dixon, R B

    1978-01-01

    In this article the author criticizes the methodology and the findings of an article by Mauldin and Berelson which appeared in 1978 in Studies in Family Planning about population decrease in developing countries and about its implications on population policies. According to the author that article did not take into consideration: 1) the fact that socioeconomic conditions in a given country are more important than family planning programs for a decrease in fertility rate; 2) the fact that it is not known which kinds of family planning programs are more effective, and which kind of social level is more conducive to fertility decrease; and, 3) the status and educational level of women in the countries studied. In conclusion, the author states that the findings of Mauldin and Berelson, although interesting, imply arbitrary procedures and statistics, and cannot be used for the purpose of population policy.

  18. Equipment qualification risk scoping analyses: Results and conclusions

    SciTech Connect

    Bustard, L.D.; Kolaczkowski, A.M.

    1989-01-01

    Probabilistic risk assessment (PRA) techniques and insights have been employed during an investigation entitled the Equipment Qualification (EQ)-Risk Scoping Study to assess the risk significance of equipment qualification issues. This approach for evaluating EQ issues suggests that some issues are not risk significant while some have a significant potential to increase risk. For example, EQ issues associated with long term accident equipment operability are not risk significant. Alternatively, there are selected system operations that require equipment not qualified for important accident environments. Though the study demonstrated that PRA does provide insights that modify perceptions regarding the importance of various EQ issues, it should be noted that PRA methods currently cannot define the risk significance for some EQ issues. Additional discussion regarding the study's results and conclusions is provided. 6 refs.

  19. Conclusive quantum steering with superconducting transition edge sensors

    NASA Astrophysics Data System (ADS)

    de Almeida, Marcelo P.; Smith, Devin H.; Gillett, Geo; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gertis, Thomas; Nam, Sae Woo; White, Andrew G.

    2012-02-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date all experimental tests with single photon states have relied on post-selection, allowing untrusted devices to cheat by hiding unfavorable events in losses. Here we close this ``detection loophole'' by combining a highly efficient source of entangled photon pairs with superconducting transition edge sensors. We achieve an unprecedented ˜62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 standard deviations. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  20. Conclusive quantum steering with superconducting transition-edge sensors

    NASA Astrophysics Data System (ADS)

    Smith, Devin H.; Gillett, Geoff; de Almeida, Marcelo P.; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gerrits, Thomas; Wiseman, Howard M.; Nam, Sae Woo; White, Andrew G.

    2012-01-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date, all experimental tests with single-photon states have relied on post selection, allowing untrusted devices to cheat by hiding unfavourable events in losses. Here we close this 'detection loophole' by combining a highly efficient source of entangled photon pairs with superconducting transition-edge sensors. We achieve an unprecedented ~62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 s.d.s. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  1. Parenteral trace element provision: recent clinical research and practical conclusions.

    PubMed

    Stehle, P; Stoffel-Wagner, B; Kuhn, K S

    2016-08-01

    The aim of this systematic review (PubMed, www.ncbi.nlm.nih.gov/pubmed and Cochrane, www.cochrane.org; last entry 31 December 2014) was to present data from recent clinical studies investigating parenteral trace element provision in adult patients and to draw conclusions for clinical practice. Important physiological functions in human metabolism are known for nine trace elements: selenium, zinc, copper, manganese, chromium, iron, molybdenum, iodine and fluoride. Lack of, or an insufficient supply of, these trace elements in nutrition therapy over a prolonged period is associated with trace element deprivation, which may lead to a deterioration of existing clinical symptoms and/or the development of characteristic malnutrition syndromes. Therefore, all parenteral nutrition prescriptions should include a daily dose of trace elements. To avoid trace element deprivation or imbalances, physiological doses are recommended. PMID:27049031

  2. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  3. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  4. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  5. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  6. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  7. Jumping to conclusions and the continuum of delusional beliefs.

    PubMed

    Warman, Debbie M; Lysaker, Paul H; Martin, Joel M; Davis, Louanne; Haudenschield, Samantha L

    2007-06-01

    The present study examined the jumping to conclusions reasoning bias across the continuum of delusional ideation by investigating individuals with active delusions, delusion prone individuals, and non-delusion prone individuals. Neutral and highly self-referent probabilistic reasoning tasks were employed. Results indicated that individuals with delusions gathered significantly less information than delusion prone and non-delusion prone participants on both the neutral and self-referent tasks, (p<.001). Individuals with delusions made less accurate decisions than the delusion prone and non-delusion prone participants on both tasks (p<.001), yet were more confident about their decisions than were delusion prone and non-delusion prone participants on the self-referent task (p=.002). Those with delusions and those who were delusion prone reported higher confidence in their performance on the self-referent task than they did the neutral task (p=.02), indicating that high self-reference impacted information processing for individuals in both of these groups. The results are discussed in relation to previous research in the area of probabilistic reasoning and delusions. PMID:17052687

  8. The harms of enhancement and the conclusive reasons view.

    PubMed

    Douglas, Thomas

    2015-01-01

    Many critics of bioenhancement go to considerable lengths to establish the existence of reasons against pursuing bioenhancements but do little to establish the absence of reasons in favor. This suggests that they accept what Allen Buchanan has called the conclusive reasons view (CRV). According to this view, our reasons against bioenhancement are obviously decisive, so there is no need to balance them against countervailing reasons. Buchanan criticizes the CRV by showing that the reasons most commonly adduced against bioenhancement are not decisive, or, at least, not obviously so. In this article, I suggest that both Buchanan and the authors to whom he is responding underestimate the strength of the case for the CRV. There are, I argue, harm-based reasons against bioenhancement that provide stronger support to the CRV than the reasons that have most often been adduced by critics of enhancement. However, I then argue that even these harm-based reasons are not obviously decisive. Thus, I ultimately agree with Buchanan about the falsity of the CRV, though I disagree with him about the reasons for its falsity.

  9. Collaborative Automation Reliably Remediating Erroneous Conclusion Threats (CARRECT)

    PubMed Central

    Lansey, Jonathan C.; Picciano, Paul; Yohai, Ian; Grant, Fred; Gern, Robert

    2013-01-01

    Objective The objective of the CARRECT software is to make cutting edge statistical methods for reducing bias in epidemiological studies easy to use and useful for both novice and expert users. Introduction Analyses produced by epidemiologists and public health practitioners are susceptible to bias from a number of sources including missing data, confounding variables, and statistical model selection. It often requires a great deal of expertise to understand and apply the multitude of tests, corrections, and selection rules, and these tasks can be time-consuming and burdensome. To address this challenge, Aptima began development of CARRECT, the Collaborative Automation Reliably Remediating Erroneous Conclusion Threats system. When complete, CARRECT will provide an expert system that can be embedded in an analyst’s workflow. CARRECT will support statistical bias reduction and improved analyses and decision making by engaging the user in a collaborative process in which the technology is transparent to the analyst. Methods Older approaches to imputing missing data, including mean imputation and single imputation regression methods, have steadily given way to a class of methods known as “multiple imputation” (hereafter “MI”; Rubin 1987). Rather than making the restrictive assumption that the data are missing completely at random (MCAR), MI typically assumes the data are missing at random (MAR). There are two key innovations behind MI. First, the observed values can be useful in predicting the missing cells, and thus specifying a joint distribution of the data is the first step in implementing the models. Second, single imputation methods will likely fail not only because of the inherent uncertainty in the missing values but also because of the estimation uncertainty associated with generating the parameters in the imputation procedure itself. By contrast, drawing the missing values multiple times, thereby generating m complete datasets along with the

  10. Spectroscopy of asteroid pairs - new observations support previous conclusions

    NASA Astrophysics Data System (ADS)

    Polishook, David; Oszkiewicz, Dagmara Anna; None Kwiatkowski, Tomasz

    2015-08-01

    Asteroid pairs were split due to fast rotation of a strengthless body. Study them can reveal fundamental principles in asteroid interiors and evolution. We continue our spectroscopic survey of asteroid pairs in the near-IR range (IRTF) and work on completing the spectral coverage in the visible wavelength (SALT, NOT).Our new observations support our previous conclusions (Polishook et al. 2014):1. Primary and secondary members have very similar reflectance spectra supporting the claim that every pair originated from a single progenitor. We measured 2 more pairs that present the same taxonomy (4905-7813, 15107-291188). This increases to 22 the number of asteroid pairs with spectral similarities and supports the claim of a single progenitor for each pair to a significance of over 5 sigma.2. Rotational fission is not a function of the asteroid composition rather the asteroid’s structure. We present new reflectance spectra of S- and C-complex pairs that differ in their composition.3. Some asteroid pairs present spectral parameters that imply a fresh, non-weathered surface. This includes spectral slope, and a deep and wide absorption band at 1 micron. Among these, the asteroid 8306 can now be re-classified as a Q-type asteroid, a common class in the near-Earth environment, but rare in the main belt. 8306 is the 4th Q-type discovered within asteroid pairs (all locate in the main belt).4. A secondary member of an asteroid pair composed of ordinary chondrite (S-complex) might present a reflectance spectrum with lower spectral slope compared to its primary member. This is seen in the new measured reflectance spectrum of secondary 291188). This result supports the theory of Jacobson & Scheeres (2011) of continuous disintegration of the secondaries while still in the vicinity of their primaries.5. With time, the fresh surface becomes weathered. Dynamical calculations limit the disintegration time of the progenitor of the pair 4905-7813 to 1.65 millions years ago, what makes

  11. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Design and Construction Control Surfaces § 23.655 Installation. (a)...

  12. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  13. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  14. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  15. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  16. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  17. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section 183.392 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392...

  18. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  19. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  20. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  1. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  2. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander....

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  4. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  5. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  6. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant General § 27.901 Installation. (a) For the purpose of this part, the powerplant installation includes each part of the rotorcraft (other than the main and... and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect...

  7. 14 CFR 27.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant General § 27.901 Installation. (a) For the purpose of this part, the powerplant installation includes each part of the rotorcraft (other than the main and... and the rest of the rotorcraft; (4) Axial and radial expansion of turbine engines may not affect...

  8. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  9. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... installation site is protected from surface run-off and can be graded in accordance with part 3285. (b... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation suitability. 3286.405 Section 3286.405 Housing and Urban Development Regulations Relating to Housing and Urban...

  10. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... installation site is protected from surface run-off and can be graded in accordance with part 3285. (b... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Installation suitability. 3286.405 Section 3286.405 Housing and Urban Development Regulations Relating to Housing and Urban...

  11. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... installation site is protected from surface run-off and can be graded in accordance with part 3285. (b... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Installation suitability. 3286.405 Section 3286.405 Housing and Urban Development Regulations Relating to Housing and Urban...

  12. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... installation site is protected from surface run-off and can be graded in accordance with part 3285. (b... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Installation suitability. 3286.405 Section 3286.405 Housing and Urban Development Regulations Relating to Housing and Urban...

  13. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... installation site is protected from surface run-off and can be graded in accordance with part 3285. (b... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Installation suitability. 3286.405 Section 3286.405 Housing and Urban Development Regulations Relating to Housing and Urban...

  14. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  15. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Utility installations. 817.180 Section 817.180 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a...

  16. 30 CFR 816.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Utility installations. 816.180 Section 816.180 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... § 816.180 Utility installations. All surface coal mining operations shall be conducted in a manner...

  17. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  18. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  19. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  20. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  1. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  2. Cosmological Gamma-Ray Bursts and Hypernovae Conclusively Linked

    NASA Astrophysics Data System (ADS)

    2003-06-01

    Clearest-Ever Evidence from VLT Spectra of Powerful Event Summary A very bright burst of gamma-rays was observed on March 29, 2003 by NASA's High Energy Transient Explorer (HETE-II) , in a sky region within the constellation Leo. Within 90 min, a new, very bright light source (the "optical afterglow") was detected in the same direction by means of a 40-inch telescope at the Siding Spring Observatory (Australia) and also in Japan. The gamma-ray burst was designated GRB 030329 , according to the date. And within 24 hours, a first, very detailed spectrum of this new object was obtained by the UVES high-dispersion spectrograph on the 8.2-m VLT KUEYEN telescope at the ESO Paranal Observatory (Chile). It allowed to determine the distance as about 2,650 million light-years (redshift 0.1685). Continued observations with the FORS1 and FORS2 multi-mode instruments on the VLT during the following month allowed an international team of astronomers [1] to document in unprecedented detail the changes in the spectrum of the optical afterglow of this gamma-ray burst . Their detailed report appears in the June 19 issue of the research journal "Nature". The spectra show the gradual and clear emergence of a supernova spectrum of the most energetic class known, a "hypernova" . This is caused by the explosion of a very heavy star - presumably over 25 times heavier than the Sun. The measured expansion velocity (in excess of 30,000 km/sec) and the total energy released were exceptionally high, even within the elect hypernova class. From a comparison with more nearby hypernovae, the astronomers are able to fix with good accuracy the moment of the stellar explosion. It turns out to be within an interval of plus/minus two days of the gamma-ray burst. This unique conclusion provides compelling evidence that the two events are directly connected. These observations therefore indicate a common physical process behind the hypernova explosion and the associated emission of strong gamma

  3. Device for mooring a floating installation to an anchored offshore installation

    SciTech Connect

    Delamare, G.R.

    1982-11-23

    The device is made up of a connecting arm provided with rollers which bears on a cylindrical portion of the outer wall of the anchored offshore installation. Belts encircling this installation and the rollers are stretched to press these rollers against the cylindrical surface and permit rotation of the arm relative to the offshore installation.

  4. The Alaska earthquake, March 27, 1964: lessons and conclusions

    USGS Publications Warehouse

    Eckel, Edwin B.

    1970-01-01

    local waves. Better earthquake-hazard maps, based on improved knowledge of regional geology, fault behavior, and earthquake mechanisms, are needed for the entire country. Their preparation will require the close collaboration of engineers, seismologists, and geologists. Geologic maps of all inhabited places in earthquake-prone parts of the country are also needed by city planners and others, because the direct relationship between local geology and potential earthquake damage is now well understood. Improved and enlarged nets of earthquake-sensing instruments, sited in relation to known geology, are needed, as are many more geodetic and hydrographic measurements. Every large earthquake, wherever located, should be regarded as a full-scale laboratory experiment whose study can give scientific and engineering information unobtainable from any other source. Plans must be made before the event to insure staffing, funding, and coordination of effort for the scientific and engineering study of future earthquakes. Advice of earth scientists and engineers should be used in the decision-making processes involved in reconstruction after any future disastrous earthquake, as was done after the Alaska earthquake. The volume closes with a selected bibliography and a comprehensive index to the entire series of U.S. Geological Survey Professional Papers 541-546. This is the last in a series of six reports that the U.S. Geological Survey published on the results of a comprehensive geologic study that began, as a reconnaissance survey, within 24 hours after the March 27, 1964, Magnitude 9.2 Great Alaska Earthquake and extended, as detailed investigations, through several field seasons. The 1964 Great Alaska earthquake was the largest earthquake in the U.S. since 1700. Professional Paper 546, in 1 part, describes Lessons and Conclusions.

  5. Advances in methods for deepwater TLP installations

    SciTech Connect

    Wybro, P.G.

    1995-10-01

    This paper describes a method suitable for installing deepwater TLP structures in water depths beyond 3,000 ft. An overview is presented of previous TLP installation, wherein an evaluation is made of the various methods and their suitability to deepwater applications. A novel method for installation of deepwater TLP`s is described. This method of installation is most suitable for deepwater and/or large TLP structures, but can also be used in moderate water depth as well. The tendon installation method utilizes the so-called Platform Arrestor Concept (PAC), wherein tendon sections are transported by barges to site, and assembled vertically using a dynamically position crane vessel. The tendons are transferred to the platform where they are hung off until there are a full complement of tendons. The hull lock off operation is performed on all tendons simultaneously, avoiding dangerous platform resonant behavior. The installation calls for relatively simple installation equipment, and also enables the use of simple tendon tie-off equipment, such as a single piece nut.

  6. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  7. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  8. Hydrogen isotope separation installation for tritium facility

    SciTech Connect

    Andreev, B.M.; Perevezentsev, A.N.; Selivanenko, I.L.; Tenyaev, B.N.; Vedeneev, A.I.; Golubkov, A.N.

    1995-10-01

    The separation of hydrogen isotopes in the hydrogen-palladium system in sectioned separation columns with the simulation of counter-current isotopic exchange is described. The separation efficiency of sectioned columns is investigated with the experimental installation as a function of various parameters. The separation of deuterium-tritium mixtures with high tritium concentrations is tested with the pilot installation operating at room temperature and atmospheric hydrogen pressure. Due to very high separation efficiency, flexibility and simplicity of operation separation installations with sectioned columns are ideally suitable for tritium laboratories and facilities dealing with separation of hydrogen isotopes. Estimation of applicability of sectioned columns for regeneration of exhaust gas in a fuel cycle of thermonuclear reactors, such as JET and ITER, shows the number of advantages of separation installations with sectioned columns. 12 refs., 3 figs., 2 tabs.

  9. FORCAST Camera Installed on SOFIA Telescope

    NASA Video Gallery

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  10. Space Station Live: Installing the AMS

    NASA Video Gallery

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  11. Prototype solar-heating system - installation manual

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Manual for prototype solar-heating system gives detailed installation procedures for each of seven subsystems. Procedures for operation and maintenance are also included. It discusses architectural considerations, building construction considerations, and checkout-test procedures.

  12. Riser, pipelines installed in Griffin field

    SciTech Connect

    Not Available

    1994-05-23

    A mooring riser and flow lines along with a 67-km, 8-in., gas-export pipelines have been installed offshore Australia for BHP Petroleum's Griffin field development. The 66-km gas line will carry Griffin field gas to an onshore gas-processing plant. Completing the projects ahead of schedule was Clough Stena Joint Venture (Asia), Perth. BHP awarded the contracts in early 1993; the project was completed in January this year. The paper describes the contractor, pipeline installation, and handling equipment.

  13. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  14. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  15. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  16. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  17. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  18. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD... installations of new manufactured homes in a state without a qualifying installation program must itself have, or must employ someone who has, a valid manufactured home installation license issued in...

  19. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD... installations of new manufactured homes in a state without a qualifying installation program must itself have, or must employ someone who has, a valid manufactured home installation license issued in...

  20. 24 CFR 3286.205 - Prerequisites for installation license.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD... obtain an installation license to perform manufactured home installations under the HUD-administered...) 1,800 hours of experience installing manufactured homes; (ii) 3,600 hours of experience in...

  1. 24 CFR 3286.205 - Prerequisites for installation license.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD... obtain an installation license to perform manufactured home installations under the HUD-administered...) 1,800 hours of experience installing manufactured homes; (ii) 3,600 hours of experience in...

  2. (Collaboration with the Institut de Physique Nucleaire, Universite de Paris Sud, on use of skull melting techniques to grow ZrO/sub 2/ crystals doped with divalent ions, Orsay, France, March 2--6, 1989): Foreign trip report

    SciTech Connect

    Finch, C.B.

    1989-07-21

    The traveler collaborated with Michel Genet and others at the Institut de Physique Nucleaire to grow CaO-stabilized ZrO/sub 2/ single crystals by the skull technique. This effort was the initial state of a program to produce rare-earth-doped ZrO/sub 2/ single-crystal specimens to be used in spectroscopic studies at both IPN and ORNL. Because of a re-direction in the research priorities at the IPN and the accompanying dearth of funding for this project, this assignment was terminated with the mutual consent of the two institutions.

  3. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  4. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  5. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  6. PUREX exhaust ventilation system installation test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment.

  7. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  8. Installation loading and stress analysis involved with pipelines installed by horizontal directional drilling

    SciTech Connect

    Huey, D.P.; Hair, J.D.; McLeod, K.B.

    1996-08-01

    Pipelines installed by horizontal directional drilling (HDD) are subject to a combination of tension, blending, and external pressure. These installation loads, either individually or in combination, can be more severe than operational loads and may govern drilled path design or specification. This is particularly true as the state of the art in horizontal directional drilling is advanced to larger pipe diameters and longer drilled lengths. This paper presents methods for calculating installation loads, including pulling forces, and analyzing combined stresses in steel pipe during installation and operation. Pipe to soil frictional and fluidic drag forces are discussed. A method for analyzing the effect of bends on pulling force is presented. Methods of analysis are illustrated with example calculations. The paper results from work done under the sponsorship of the Pipeline Research Committee at the American Gas Association and is taken from an engineering design guide produced specifically for HDD pipeline installation. 10 refs., 5 figs.

  9. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  10. Fifth wheel installation, S97556, Issue H

    SciTech Connect

    Arning, C.

    1994-12-31

    This report consists of one engineering drawing showing the design of the Fifth Wheel System for a semi-tractor trailer truck. Notes on the drawing give instructions for installation of some items, references to other drawings and instructions, and testing procedures.

  11. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating... applicable requirements of subchapter F (Marine Engineering) of this chapter as determined necessary by...

  12. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating... applicable requirements of subchapter F (Marine Engineering) of this chapter as determined necessary by...

  13. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  14. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  15. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  16. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  17. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  18. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  19. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  20. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  1. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209...

  2. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  3. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities §...

  4. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  5. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  6. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  7. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  8. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  9. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  10. Proper installation ensures turbine meter accuracy

    SciTech Connect

    Peace, D.W.

    1995-07-01

    Turbine meters are widely used for natural gas measurement and provide high accuracy over large ranges of operation. However, as with many other types of flowmeters, consideration must be given to the design of the turbine meter and the installation piping practice to ensure high-accuracy measurement. National and international standards include guidelines for proper turbine meter installation piping and methods for evaluating the effects of flow disturbances on the design of those meters. Swirl or non-uniform velocity profiles, such as jetting, at the turbine meter inlet can cause undesirable accuracy performance changes. Sources of these types of flow disturbances can be from the installation piping configuration, an upstream regulator, a throttled valve, or a partial blockage upstream of the meter. Test results on the effects of swirl and jetting on different types of meter designs and sizes emphasize the need to consider good engineering design for turbine meters, including integral flow conditioning vanes and adequate installation piping practices for high accuracy measurement.

  11. D0 Cryo CC Heater Installation

    SciTech Connect

    Urbin, J.; /Fermilab

    1991-03-16

    Nine pairs of heaters are installed in the bottom of the CC pressure vessel.The physical layout is shown in the CC internal development drawing, D0 dwg. 3740.510-ME-255523. Electrically the heater system is a delta configuration. Electrical details are found on D0 dwg. 3740.515EC-273761. The feedthrough connectors for power to the heaters are located in the instrumentation box. Connector positions are found on D0 dwg.3740.515-EC-273760. Original sketches for the above named drawings are included in this document. The heaters and wiring were cleaned various times prior to and after installation with ethyl a1chohol. At various stages in the installation hi-pot and continuity tests were successfully accomplished to verify the integrity of the system. The fmal hi-pot numbers are included in the documentation. The heaters and wiring are kept separated from thermometry and purity cell wiring by SS sheetmetal barriers. The fabrication, testing and installation was completed by M. Hentges and his crew from AD/Cryo.

  12. 14 CFR 23.1061 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Installation. (a) General. Each liquid-cooled engine must have an independent cooling system (including coolant... must be treated to prevent absorption of flammable fluids; and (4) No air or vapor can be trapped in... space of at least 10 percent of the total cooling system capacity; and (3) It must be impossible to...

  13. 14 CFR 23.1061 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Installation. (a) General. Each liquid-cooled engine must have an independent cooling system (including coolant... must be treated to prevent absorption of flammable fluids; and (4) No air or vapor can be trapped in... space of at least 10 percent of the total cooling system capacity; and (3) It must be impossible to...

  14. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system... of IEEE 45-2002 (incorporated by reference; see 46 CFR 110.10-1); or (b) IEC 92-304 (incorporated...

  15. Surface mine fan installations at Inco Limited

    SciTech Connect

    Stachulak, J.S.

    1995-12-31

    Inco Limited operates 11 underground mines in the Sudbury District. The mines are located on the rim of the Sudbury Basin, an oval with the axis in the range of 27 and 60 km. The ore dips to at least 3000 m below surface. The ores are mined primarily for nickel and copper. Total ore production from underground is in excess of 55,000 tons per day. Over 40 surface fans have been installed since the late 1960`s. All of the fans are adjustable pitch, axial flow units. A major factor influencing ventilation design in the last 30 years has been the introduction of diesel equipment underground. Volumes per fan have ranged from 60 to 330 (cubic metres per second), with motors from 100 to 2500 hp. Fans of the axial flow type have been in common use for main fan installations at Canadian mines for many years. The standard arrangement has been to mount these fans horizontally, i.e. with the fan shaft and the long axis of the housing horizontal. This is a natural arrangement for an underground fan, but for a surface installation, a vertically mounted fan has definite advantages. The surface area taken up by a typical vertical fan installation is generally about one quarter of that with a horizontal fan of the same capacity. This is not a problem with isolated fans and flat surface outcrop sites, but where the installation is to be near existing buildings, or where there are poor surface soil conditions, space and cost considerations greatly favour vertical fans.

  16. 47 CFR 1.30003 - Installations on an AM antenna.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Installations on an AM antenna. 1.30003 Section... Random Selection Disturbance of AM Broadcast Station Antenna Patterns § 1.30003 Installations on an AM antenna. (a) Installations on a nondirectional AM tower. When antennas are installed on a...

  17. 24 CFR 3286.105 - Requirement for installer licensing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Requirement for installer licensing. 3286.105 Section 3286.105 Housing and Urban Development Regulations Relating to Housing and Urban...-Administered States § 3286.105 Requirement for installer licensing. (a) Installer Licensing. The installer...

  18. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section...

  19. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section...

  20. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section...

  1. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section...

  2. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2010-10-01 2010-10-01 false Gasoline engine installations. 58.10-5 Section...

  3. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section...

  4. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  5. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  6. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for...

  7. Analysis of heat pumps installed in family housing at Hunter Army Air Field

    SciTech Connect

    Parker, S.A.

    1994-08-01

    The US Army Forces Command (FORSCOM) tasked Pacific Northwest Laboratory (PNL) in support of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) to conduct a postconstruction evaluation of the air-source heat pumps installed in family housing at Hunter Army Air Field (AAF). The objective of this project was to investigate and resolve concerns about an increase in energy costs at Hunter AAF following the installation of heat pumps in November 1992. After completing several analyses and a field inspection of the heat pumps in family housing at Hunter AAF, the following conclusions were made: the installation of air-source heat pumps reduced the annual energy cost in family housing by $46,672 in 1993; the heat pump thermostat controls in Hunter AAF family housing appear to be incorrectly installed; and the Hunter AAF electric utility bill increased 10% during the first 6 months of 1993 compared to the first 6 months of 1992.

  8. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Employees at NASA's John C. Stennis Space Center complete installation of the new thrust measurement system on the A-1 Test Stand. The new TMS is a state-of-the-art upgrade from the previous system, which was installed when the testing structure was built in the 1960s. It is an advanced calibration system capable of measuring vertical and horizontal thrust loads with accuracy within 0.15 percent at 225,000 pounds. It also will allow engineers to measure thrust as they gimbal (or tilt) engines during tests. The new TMS is part of upgrades for the A-1 Test Stand in preparation for testing the next generation of American space program rocket engines.

  9. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  10. The Samarkand EAS installation and experimental results

    NASA Astrophysics Data System (ADS)

    Makhmudov, B. M.; Sirodzhev, N. S.; Alimov, T. A.; Aliev, N. A.; Kakhkharov, M. K.; Khamikov, N. Kh.; Vernov, S. N.; Khristiansen, G. B.

    1982-09-01

    The Samarkand University extensive-air-shower installation is briefly described, and experimental results obtained at this installation are discussed. It is shown that the spatial distribution of EAS Cerenkov emission at distances of 10-100 m from the EAS axis with respect to shape and absolute value given a purely protonic composition of the primary radiation can be made compatible with the scaling model only under the assumption of an anomalously sharp increase with energy of the cross section of the inelastic interactions of hadrons with atomic air nuclei. In addition, it is shown that the Xmax(E0) relationship (Xmax is the position of the maximum of an individual EAS) obtained at E0 exceeding 10 to the 17th eV on the basis of Yakutsk data does not contradict Samarkand data at E0 = 10 to the 16th eV.

  11. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    A new thrust measurement system is lifted onto the A-1 Test Stand deck at NASA's John C. Stennis Space Center in preparation for its installation. The new system is a state-of-the-art upgrade for the testing structure, which is being prepared for testing of next-generation rocket engines. The system was fabricated by Thrust Measurement Systems in Illinois at a cost of about $3.5 million.

  12. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Stennis Space Center employees maneuver a new thrust measurement system in preparation for its installation on the A-1 Test Stand on March 3. The system was fabricated by Thrust Measurement Systems in Illinois and represents a state-of-the-art upgrade from the equipment used on the stand for more than 40 years. The A-1 Test Stand is being upgraded to provide testing for the next generation of rocket engines for America's space program.

  13. Installation of a Roof Mounted Photovoltaic System

    NASA Astrophysics Data System (ADS)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  14. Canadian pipeline installs leak-detection system

    SciTech Connect

    Yoon, M.S.; Mensik, M.; Luk, W.Y.

    1988-05-30

    Site-acceptance tests for a recently installed leak-detection system on a pipeline in southern Alberta indicated that the system will reduce spillage because of leaks. The tests on the Porcupine Hills Pipeline also indicated that pipeline isolation and spill containment are enhanced by the use of the system. Covered here are the selection, design, and implementation of the real time leak-detection system and its extension to offshore and arctic applications.

  15. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  16. How to install main belts efficiently

    SciTech Connect

    Ketz, J.

    1985-03-01

    Belt conveyors and mine cars form an integral part of the connecting link between an underground working area and the preparation plant. Problems in the link are sometimes neglected while attention is centered on the face. Eventually the neglect may cause the mine to shut down because its operating costs are too high. Mine operators can reduce the chances of such a calamity by correctly installing one of those key links, the main haulage belt conveyors. The following recommendations are based on the author's engineering experience in deep mines. The drive is the heart of the belt conveyor. Five components must be installed properly so that the mechanics can fine tune the belt conveyor drive. A concrete base is essential for a main haulage conveyor projected to be in service for more than 10 years. Beams with 6-in.-wide flanges should be welded to rails embedded in the concrete base. The drive is welded to the 6-in. beams for a permanent installation, and the beams allow dust to be cleaned from under the drive.

  17. Design and construction experience from photovoltaic installations

    NASA Astrophysics Data System (ADS)

    Kauffman, W. R.; Lambarski, T. J.; Forrester, D. L.

    Lessons learned by one company during the design, construction, and operation of several prototype commercial photovoltaic (PV) power plants are reported. Intensive on-site quality control management was found necessary for controlling costs during installation of a 1 MW array for utility power production. A need to use modular components to offset high labor costs was noted. Installation of a 240 kW array of parabolic trough concentrators at a community school revealed the significance of stable support structures for tracking systems, which require reliable electronics for operation. A roof-mounted 50 kW array showed the potential hazards from wind damage and the greater economic benefits that accrue from maximizing output rather than cutting corners on the system costs. An airbase 40 kW array disclosed heat dissipation and moisture intrusion problems in ancillary equipment, and a residential 4.68 kW roof-mounted system demonstrated the increases in installation efficiency available with larger crews and greater experience.

  18. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  19. A General Purpose High Performance Linux Installation Infrastructure

    SciTech Connect

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.

  20. Cost effective TLP installation methods and tendon top connectors

    SciTech Connect

    Wybro, P.G.; Chaison, M.

    1995-05-01

    This paper describes a novel TLP tendon top connector and motion arrest system. The top connector and motion arrest system is inherently linked to the method used to install the platform, and methods for platform installation are described. This method of installation is most suitable for deepwater and/or large TLP structures, but can also be used in moderate water depth as well. The tendon installation method utilizes the so-called Platform Arrestor Concept (PAC). The installation is procedurally not complex and calls for relatively simple installation equipment, and also enables the use of simple tendon tie-off equipment, such as a single piece nut. The tendons can be pre-installed to the foundation prior to platform arrival, or can be co-installed, i.e., installed while the platform is on location.

  1. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  2. Skaha Lake crossing, innovations in pipeline installation

    SciTech Connect

    Fernandez, M.L.; Bryce, P.W.; Smith, J.D.

    1995-12-31

    This paper describes the construction of a 10.8 km long NPS16 (406 mm, 16 inch diameter) pipeline, across Skaha Lake, in the south Okanagan valley, British Columbia, Canada. The water crossing is part of the 32 km South Okanagan Natural Gas Pipeline Project (SONG) operated by BC Gas. The pipeline is located in a region dependent on year-round tourism. Therefore, the design and construction was influenced by sensitive environmental and land use concerns. From earlier studies, BC Gas identified surface tow or lay as preferred installation methods. The contractor, Fraser River Pile and Dredge departed from a conventional laybarge methodology after evaluating environmental data and assessing locally available equipment. The contractor proposed a surface tow with multiple surface tie-ins. This approach modification to the ``Surface Tow and Buoy Release Method`` (STBRM) used previously with success on relatively short underwater pipelines. A total of 10 pipe strings, up to 1 km long, were towed into position on the lake and tied-in using a floating platform. The joined pipeline was lowered to the lakebed by divers releasing buoys while tension was maintained from a winch barge at the free end of the pipeline. From analysis and field verified measurement the installation stresses were well below the allowable limits during all phases of construction. The entire construction, including mobilization and demobilization, lasted less than three months, and actual pipelaying less than three weeks. Installation was completed within budget and on schedule, without any environmental or safety related incidents. The SONG pipeline became operational in December 1994.

  3. Method of installing sub-sea templates

    SciTech Connect

    Hampton, J.E.

    1984-03-06

    A subsea template is installed by a method which includes the steps of securing the template in a position beneath the deck of a semi-submersible drilling vessel, moving the semi-submersible drilling vessel to an appropriate offshore site and subsequently lowering the template from the semi-submersible to the sea bed. In addition, at least three anchorage templates may be loaded onto one or both of the pontoons of the semi-submersible drilling vessel at its original position and are subsequently lowered from the pontoons to their respective locations on the sea bed after the semi-submersible has moved to the offshore site.

  4. Jim Walter Resources installs new overland conveyor

    SciTech Connect

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  5. Cochin Pipeline installs workstation scada system

    SciTech Connect

    Not Available

    1993-12-13

    The Canadian operator of the Cochin Pipeline between Canada and the US has installed a workstation-based supervisory control and data acquisition (scada) system that directly links pipeline operations to the company's business accounting computer in Calgary. Amoco says that each remote workstation along the pipeline serves as a mini-scada system, monitoring and controlling devices at its particular location. These workstations collect field data that are sent over the network to the master server computer in Fort Saskatchewan, which automatically updates the data base. The network's distributed data base capability also enables the master controller to redefine parameters for the various field devices, then distribute the information to each workstation.

  6. Foam insulation gets first reeled installation off Australia

    SciTech Connect

    Mollison, M.I. )

    1992-05-18

    Development in 1989 of Seahorse and Tarwhine fields in the Bass Strait, offshore Australia, promoted the first reeled installation of the thermally insulated pipeline system known as pipe-in-pipe (PIP). This paper reports that this system consists of an inner steel pipe coated with high-density polyurethane (HDPU) foam inside an outer steel carrier pipe. The offshore lines for which PIP was finally chosen are 7 and 10.8 miles, respectively, connecting the Barracouta offshore platform and subsea wellheads at each field location. Several alternative coating systems were evaluated, as report in Part 1 of this series. This conclusion chronicles coating application and shore fabrication of PIP for this project.

  7. 14 CFR 25.1353 - Electrical equipment and installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... (b) Storage batteries must be designed and installed as follows: (1) Safe cell temperatures and... section must be shown by test unless experience with similar batteries and installations has shown...

  8. 46 CFR 76.27-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... subchapter J (Electrical Engineering) of this chapter. (f) A framed chart or diagram shall be installed...

  9. Lessons learned from installation of an environmental horizontal well

    SciTech Connect

    Oakley, D.B.; Nickelson, M.D.

    1994-12-31

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world`s longest, deepest environmental horizontal wells. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes over 5,000 ft long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft below land surface (BLS). Installation of the environmental horizontal well proved to be extremely challenging because of the depth (235 ft BLS), the length (2,500 ft) of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation.

  10. 35. FOUR TAINTER GATES BEING INSTALLED. CONCRETE PLACEMENT OVER 99% ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. FOUR TAINTER GATES BEING INSTALLED. CONCRETE PLACEMENT OVER 99% COMPLETE. NOTE SECOND STAGE COFFERDAM CELL BEING INSTALLED IN THE DRY. April 6, 1984 - Upper Mississippi River 9-Foot Channel Project, Lock & Dam 26R, Alton, Madison County, IL

  11. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  12. Energy Integrated Dairy Farm digester and cogeneration system installation

    SciTech Connect

    Ross, C.C.; Walsh, J.L.

    1984-01-01

    Georgia Tech finished in December, 1983 Phase II (system installation and startup) of its four year Energy Integrated Dairy Farm System (EIDFS) program. This paper outlines the selection and installation of the anaerobic digestion and cogeneration components of the EIDFS.

  13. Air leakage of newly instaled residential windows

    SciTech Connect

    Weidt, J.; Weidt, J.

    1980-06-01

    The air-leakage characteristics of five major window designs were measured in a field survey conducted in Twin Cities, Minnesota. A total of 192 windows (16 manufacturers) were tested at 58 sites representing a cross-section of single-family homes, townhouses, low- and high-rise apartments, and condominiums. Air-leakage measurements of the installed windows were compared with the current standard used by industry and government of 0.50 ft/sup 3//min/linear ft of crack. Other parameters studied were: effect of sash and frame material, effect of leakage between window frame and wall, differences among the product lines of a single manufacturer and between manufacturers, effect of installation practices, effect of cold weather on performance, change in performance over time for older windows, and performance of fixed glazing. Based on industry and government standards, 40% of all windows tested showed air-leakage characteristics higher than the 0.50 cfm/lfc standard, and 60% exceeded manufacturers' specifications for performance which in some cases were lower than the general industry standard. Analysis of the impact of various parameters on air-leakage performance showed that the operational design of the window was the most critical determinant although the ranking changes if performance is expressed in cfm/unit area or cfm/opening area. Air leakage was measured using a portable pressurization chamber. Smoke pencils, thermographic techniques and extensive photographic documentation provided additional data as to the location and cause of air leakage problems.

  14. Assembling and Installing LRUs for NIF

    SciTech Connect

    Bonanno, R E

    2003-12-31

    Within the 192 National Ignition Facility (NIF) beamlines, there are over 7000 large (40 x 40 cm) optical components, including laser glass, mirrors, lenses, and polarizers. These optics are held in large opto-mechanical assemblies called line-replaceable units (LRUs). Each LRU has strict specifications with respect to cleanliness, alignment, and wavefront so that once activated, each NIF beamline will meet its performance requirements. NIF LRUs are assembled, tested, and refurbished in on-site cleanroom facilities. The assembled LRUs weigh up to 1800 kilograms, and are about the size of a phone booth. They are transported in portable clean canisters and inserted into the NIF beampath using robotic transporters. This plug and play design allows LRUs to be easily removed from the beampath for maintenance or upgrades. Commissioning of the first NIF quad, an activity known as NIF Early Light (NEL), has validated LRU designs and architecture, as well as demonstrated that LRUs can be assembled and installed as designed. Furthermore, it has served to develop key processes and tools forming the foundation for NIF s long-term LRU production and maintenance strategy. As we look forward to building out the rest of NIF, the challenge lies in scaling up the production rate while maintaining quality, implementing process improvements, and fully leveraging the learning and experience gained from NEL. This paper provides an overview of the facilities, equipment and processes used to assemble and install LRUs in NIF.

  15. Drum ring removal/installation tool

    DOEpatents

    Andrade, William Andrew

    2006-11-14

    A handheld tool, or a pair of such tools, such as for use in removing/installing a bolt-type clamping ring on a container barrel/drum, where the clamping ring has a pair of clamping ends each with a throughbore. Each tool has an elongated handle and an elongated lever arm transversely connected to one end of the handle. The lever arm is capable of being inserted into the throughbore of a selected clamping end and leveraged with the handle to exert a first moment on the selected clamping end. Each tool also has a second lever arm, such as a socket with an open-ended slot, which is suspended alongside the first lever arm. The second lever arm is capable of engaging the selected clamping end and being leveraged with the handle to exert a second moment which is orthogonal to the first moment. In this manner, the first and second moments operate to hold the selected clamping end fixed relative to the tool so that the selected clamping end may be controlled with the handle. The pair of clamping ends may also be simultaneously and independently controlled with the use of two handles/tools so as to contort the geometry of the drum clamping ring and enable its removal/installation.

  16. Performance of Installed Cooking Exhaust Devices

    SciTech Connect

    Singer, Brett C.; Delp, William W.; Apte, Michael G.; Price, Philip N.

    2011-11-01

    The performance metrics of airflow, sound, and combustion product capture efficiency (CE) were measured for a convenience sample of fifteen cooking exhaust devices, as installed in residences. Results were analyzed to quantify the impact of various device- and installation-dependent parameters on CE. Measured maximum airflows were 70% or lower than values noted on product literature for 10 of the devices. Above-the-cooktop devices with flat bottom surfaces (no capture hood) – including exhaust fan/microwave combination appliances – were found to have much lower CE at similar flow rates, compared to devices with capture hoods. For almost all exhaust devices and especially for rear-mounted downdraft exhaust and microwaves, CE was substantially higher for back compared with front burner use. Flow rate, and the extent to which the exhaust device extends over the burners that are in use, also had a large effect on CE. A flow rate of 95 liters per second (200 cubic feet per minute) was necessary, but not sufficient, to attain capture efficiency in excess of 75% for the front burners. A-weighted sound levels in kitchens exceeded 57 dB when operating at the highest fan setting for all 14 devices evaluated for sound performance.

  17. Installation of an innovative remedial technology

    SciTech Connect

    Hines, B.

    1995-12-31

    The major goal of the Lasagna{trademark} project was to design, construct, install, and operate an in situ remediation system in low-permeability soil. A new technology--the Lasagna process--uses electro-osmosis to move contaminated groundwater through treatment zones. The treatment zones are installed in contaminated soils, thereby forming an integrated in situ remedial process. Electro-osmosis, well known for its effectiveness and extremely low power consumption, uses a direct current to cause Groundwater to travel through low-permeability soil. When a bench-scale version of the technology was 98 percent effective in removing contamination, an actual field test was the next step. The site chosen for this first field effort was the DOE-owned Paducah Gaseous Diffusion Plant located in Paducah, Kentucky. The target contaminant for this project was trichloroethylene (TCE) because it is found at many sites across the country and is present at approximately 60 percent of DOE`s sites.

  18. Multilateral installation from a floating rig

    SciTech Connect

    1998-07-01

    The Troll Olje gas province is approximately 100 km northwest of Bergen, Norway, in the Norwegian sector of the North Sea at a water depth of approximately 315 to 340 m. Troll Olje is part of the Troll gas field, where Norsk Hydro is responsible for developing two areas with thin oil rims. Before spudding the multilateral well described in this paper, 17 wells had been drilled and completed in the Troll Olje oil province. The multilateral-well concept was introduced in the gas province primarily to increase the drainage area for each well. When producing from two separate laterals, a lower drawdown pressure exists throughout the horizontal section. Therefore, gas coning is less likely to occur, and higher production rates can be sustained for a longer period of time. In addition, cost savings are substantial because of reduced well-construction time for each horizontal reservoir-drainage section and because of the reduced number of completion strings, subsea wellheads, and pipelines required for total field development. The full-length paper details design, development, testing, and installation of the first successful multilateral well installed from a floating rig offshore Norway. The paper gives a synopsis.

  19. 14 CFR 27.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Storage battery design and installation. 27... Equipment § 27.1353 Storage battery design and installation. (a) Each storage battery must be designed and... test unless experience with similar batteries and installations has shown that maintaining safe...

  20. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  1. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  2. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  3. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  4. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  5. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  6. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  7. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  8. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  9. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  10. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  11. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  12. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  13. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  14. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  15. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  16. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane content in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  17. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  18. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  19. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering)...

  20. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  1. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  2. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  3. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  4. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that...

  5. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  6. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  7. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  8. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the...

  9. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  10. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  11. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification...

  12. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  13. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  14. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance....

  15. 30 CFR 77.206 - Ladders; construction; installation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Ladders; construction; installation and... OF UNDERGROUND COAL MINES Surface Installations § 77.206 Ladders; construction; installation and maintenance. (a) Ladders shall be of substantial construction and maintained in good condition. (b)...

  16. 30 CFR 77.206 - Ladders; construction; installation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Ladders; construction; installation and... OF UNDERGROUND COAL MINES Surface Installations § 77.206 Ladders; construction; installation and maintenance. (a) Ladders shall be of substantial construction and maintained in good condition. (b)...

  17. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used...

  18. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... 46 Shipping 2 2012-10-01 2012-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  19. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  20. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  1. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... 46 Shipping 2 2013-10-01 2013-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  2. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... reference, see 46 CFR 58.03-1). (b) Materials. The materials used for gas turbine installations shall have... 46 Shipping 2 2014-10-01 2014-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine...

  3. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  4. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  5. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  6. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  7. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary...

  8. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation,...

  9. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation,...

  10. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be...

  11. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation,...

  12. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 195.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall...

  13. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 195.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall...

  14. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 195.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall...

  15. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation,...

  16. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be...

  17. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 195.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall...

  18. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be...

  19. 46 CFR 96.05-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 96.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation,...

  20. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be...

  1. 46 CFR 77.05-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communication Systems § 77.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communications nature, together with the details of design, construction, and installation, shall be...

  2. 46 CFR 195.05-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Electrical Engineering and Interior Communications Systems § 195.05-1 Installation and details. (a) The installation of all systems of an electrical engineering or interior communication nature, together with the details of design, construction, and installation shall...

  3. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  4. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  5. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  6. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  7. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  8. 32 CFR 636.11 - Installation traffic codes

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this...

  9. 32 CFR 636.11 - Installation traffic codes

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes 636.11 Section 636.11... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION (SPECIFIC INSTALLATIONS) Fort Stewart, Georgia § 636.11 Installation traffic codes In addition to the requirements in § 634.25(d) of this...

  10. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  11. 49 CFR 192.383 - Excess flow valve installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Excess flow valve installation. 192.383 Section..., and Service Lines § 192.383 Excess flow valve installation. (a) Definitions. As used in this section... serves only one single-family residence. (b) Installation required. An excess flow valve...

  12. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  13. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  14. 7 CFR 766.58 - Installment to be set aside.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Installment to be set aside. 766.58 Section 766.58... AGRICULTURE SPECIAL PROGRAMS DIRECT LOAN SERVICING-SPECIAL Disaster Set-Aside § 766.58 Installment to be set aside. (a) The Agency will set-aside the first installment due immediately after the disaster...

  15. 24 CFR 3280.709 - Installation of appliances.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., solid fuel-burning fireplaces and solid fuel-burning fireplace stoves, shall be installed to provide for... stoves listed for use in manufactured homes may be installed in manufactured homes provided they and their installation conform to the following paragraphs. A fireplace or fireplace stove shall not...

  16. 24 CFR 3280.709 - Installation of appliances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., solid fuel-burning fireplaces and solid fuel-burning fireplace stoves, shall be installed to provide for... stoves listed for use in manufactured homes may be installed in manufactured homes provided they and their installation conform to the following paragraphs. A fireplace or fireplace stove shall not...

  17. 24 CFR 3280.709 - Installation of appliances.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., solid fuel-burning fireplaces and solid fuel-burning fireplace stoves, shall be installed to provide for... stoves listed for use in manufactured homes may be installed in manufactured homes provided they and their installation conform to the following paragraphs. A fireplace or fireplace stove shall not...

  18. 24 CFR 3280.709 - Installation of appliances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., solid fuel-burning fireplaces and solid fuel-burning fireplace stoves, shall be installed to provide for... stoves listed for use in manufactured homes may be installed in manufactured homes provided they and their installation conform to the following paragraphs. A fireplace or fireplace stove shall not...

  19. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all exhaust systems must ensure minimum risk of injury to personnel. Protection must be provided in...

  20. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section...

  1. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section...

  2. 49 CFR 192.361 - Service lines: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... line. (d) Protection against piping strain and external loading. Each service line must be installed so... 49 Transportation 3 2011-10-01 2011-10-01 false Service lines: Installation. 192.361 Section 192..., and Service Lines § 192.361 Service lines: Installation. (a) Depth. Each buried service line must...

  3. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  4. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  5. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  6. 30 CFR 77.511 - Danger signs at electrical installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Danger signs at electrical installations. 77... UNDERGROUND COAL MINES Electrical Equipment-General § 77.511 Danger signs at electrical installations. Suitable danger signs shall be posted at all major electrical installations....

  7. 14 CFR 23.1337 - Powerplant instruments installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Powerplant instruments installation. 23... Equipment Instruments: Installation § 23.1337 Powerplant instruments installation. (a) Instruments and instrument lines. (1) Each powerplant and auxiliary power unit instrument line must meet the requirements...

  8. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  9. 24 CFR 3285.501 - Home installation manual supplements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Home installation manual... HOUSING AND URBAN DEVELOPMENT MODEL MANUFACTURED HOME INSTALLATION STANDARDS Optional Features § 3285.501 Home installation manual supplements. Supplemental instructions for optional equipment or features...

  10. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    SciTech Connect

    WHITE, W.F.

    1999-12-16

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services.

  11. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  12. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  13. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  14. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  15. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  16. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  17. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., combustible material. (2) Be provided with noncombustible hangers and blocks for support. (h) An exhaust pipe... 46 Shipping 4 2014-10-01 2014-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of...

  18. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  19. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  20. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  1. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  2. 47 CFR 80.1083 - Ship radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Ship radio installations. 80.1083 Section 80... for Ship Stations § 80.1083 Ship radio installations. (a) Ships must be provided with radio... controls for operating the radio installation; and (5) Be clearly marked with the call sign, the...

  3. 47 CFR 80.1083 - Ship radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Ship radio installations. 80.1083 Section 80... for Ship Stations § 80.1083 Ship radio installations. (a) Ships must be provided with radio... controls for operating the radio installation; and (5) Be clearly marked with the call sign, the...

  4. 47 CFR 80.1083 - Ship radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Ship radio installations. 80.1083 Section 80... for Ship Stations § 80.1083 Ship radio installations. (a) Ships must be provided with radio... controls for operating the radio installation; and (5) Be clearly marked with the call sign, the...

  5. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  6. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  7. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell...

  8. 78 FR 45104 - Model Manufactured Home Installation Standards: Ground Anchor Installations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... Manufactured Home Installation Standards final rule, which was published on October 19, 2007 (72 FR 59338.... Background Ground anchors consist of a specific assembly designed to transfer home anchoring loads to the... mechanisms as a function of soil type, anchor depth, and load configuration. In cohesive soils,...

  9. CATS landline installed beneath the river Tees

    SciTech Connect

    Not Available

    1992-08-01

    Press Construction Ltd. has completed installation of the land portion of a new gas pipeline from the North Sea, including a tunnel beneath the River Tees in the north of England. The work was carried out under a multi-million dollar contract from Amoco (UK) Exploration Co. The pipeline is the land portion of the Central Area Transmission System. The 4.6-mile, 36-in. onshore pipeline connects a valve station at the CATS landfall at Coatham Sands, just south of Tees Bay, to a gas terminal north of the River Tees. This paper reports on the entire CATS system which runs for nearly 250 miles from a riser platform in the Central Graben area of the North Sea to the Coatham Sands landfall and then overland to the gas terminal. The gas will fuel a new combined heat-and-power generating plant on Teesside, currently under construction by Teesside Power.

  10. Economics of installation of solar heating plants

    NASA Astrophysics Data System (ADS)

    Popel, O. S.; Frid, S. Y.; Shpiltayn, E. E.

    1984-04-01

    An engineering-economic analysis of solar heating plants for determination of their cost effectiveness involves calculating the maximum economically feasibile extra capital investment on their installation and calculating the fraction of the total heat demand covered by such a plant which makes replacement of conventional heating plant maximally economical. The annual economic effect of solar heating is calculated in terms of normalized cost differential, as criterion for its competitiveness with conventional heating. Plant performance characteristics, namely dependence of both the percent demand coverage and the annual cost differential on the area of solar radiation collectors is then considered. Analysis of the cost equation, assuming that the extra fixed cost is proportional to the collector area, reveals the necessary and sufficient condition for decrease of annual operating cost.

  11. Dark energy camera installation at CTIO: overview

    NASA Astrophysics Data System (ADS)

    Abbott, Timothy M.; Muñoz, Freddy; Walker, Alistair R.; Smith, Chris; Montane, Andrés.; Gregory, Brooke; Tighe, Roberto; Schurter, Patricio; van der Bliek, Nicole S.; Schumacher, German

    2012-09-01

    The Dark Energy Camera (DECam) has been installed on the V. M. Blanco telescope at Cerro Tololo Inter-American Observatory in Chile. This major upgrade to the facility has required numerous modifications to the telescope and improvements in observatory infrastructure. The telescope prime focus assembly has been entirely replaced, and the f/8 secondary change procedure radically changed. The heavier instrument means that telescope balance has been significantly modified. The telescope control system has been upgraded. NOAO has established a data transport system to efficiently move DECam's output to the NCSA for processing. The observatory has integrated the DECam highpressure, two-phase cryogenic cooling system into its operations and converted the Coudé room into an environmentally-controlled instrument handling facility incorporating a high quality cleanroom. New procedures to ensure the safety of personnel and equipment have been introduced.

  12. Case studies of six high priority DOD installations

    SciTech Connect

    1994-11-01

    This is a supplement to the report entitled Environmental Cleanup: Too Many High Priority Sites Impede DOD`s Program. It provides six installation case studies addressing issues including the status of the restoration program, the cost of cleanup to date and projected costs, the cleanup options considered, the option selected, expected completion, and the applicable cleanup standards. The case studies also provide installation specific information on reasons installation was listed on the NPL, the regulatory process, cooperation between the installation and the regulatory agencies, staffing at the installations and the regulatory agencies, and the process for funding the cleanup.

  13. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  14. 39 CFR 953.11 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings of fact and conclusions of law... PROCEEDINGS RELATIVE TO MAILABILITY § 953.11 Proposed findings of fact and conclusions of law. Proposed findings of fact and conclusions of law shall be submitted orally or in writing at the conclusion of...

  15. Gigabits to the Desktop: Installing tomorrow`s networks today

    SciTech Connect

    Kuhfuss, T.C.; Phillips, P.T.

    1994-03-01

    Argonne is one of the US Department of Energy`s world class research institutions. Leading edge computing tools and networks allow Argonne to maintain and enhance this reputation. One current effort to deploy leading edge tools is the Argonne ``Gigabits to the Desktop`` project. While the delivering and using gigabits to the desktop is little more than a hope at this time, this paper will discuss the hurdles to achieving it and how to tear down as many hurdles as possible. Under this project, four distinct areas are being investigated and enhanced. This paper will discuss briefly the applications and tools that we see driving the requirement for gigabits to the desktop. It will touch on a functional description of our``ideal`` workstations, architectures and the candidates for the next generation network capable of delivering gigabits. Lastly, it will provide an in-depth analysis of physical layer options and attempt to prove that this area, while the least risky, must be done properly, with the proper media. This paper assumes one important point. It assumes that bandwidth is essentially free. We will discuss network architectures and physical installation recommendations which have a fixed cost. However on a campus, there is no marginal cost for additional packets on these networks once the network infrastructure is installed. This point is important when extrapolating our conclusions to the wide area. The marginal cost of a packet sent to a commercial network is usually non zero. This fact may prove to be a great hindrance in migrating the applications mentioned beyond the organizational boundaries.

  16. Topo-Iberia GPS network: installation complete

    NASA Astrophysics Data System (ADS)

    Khazaradze, G.

    2009-04-01

    As part of the project, titled "Geociencias en Iberia: Estudios integrados de topografía y evolución 4D: Topo-Iberia", we have established a network of 26 continuous GPS stations, covering the Spanish part of the Iberian Peninsula (22 stations) and Morocco (4 stations). A major objective behind the establishment of this array is to monitor millimeter level deformation of the crust due to the collision of African and Eurasian (including Iberian) tectonic plates. More specific goals of the project include the identification of the areas and/or specific seismic faults which exhibit higher deformation rates, which could imply an increased seismic hazard in these specific areas. The network has been designed as two X-shaped transects crossing the peninsula from NE to SW and NW to SE, with relatively coarse distribution of the stations, superimposed with denser coverage in the seismically active areas of the Betics, Pyrenees and Cantabrian chains. The majority of the built monuments consist of 1.5-1.8 m tall concrete pillars of 40 cm in diameter anchored to the bedrock using iron rebars. One station in Huesca was built according the UNAVCO's short drilled braced monument (SDBM) specifications. All the monuments were equipped with the SCIGN leveling mounts to ensure the precise antenna alignment and re-alignment in case of the antenna replacement, as well as, tamper resistance of the monument mark. In places were the snow accumulation was possible the antennas were covered with plastic radomes. The instrumentation used is Trimble NetRS dual-frequency receivers with choke-ring antennas. The communication is mainly via cellular telephone system. As of December 2008, the network installation has been competed and all the stations are fully operational. Here we report the milestones of the installation of the network and, as well as, present the first preliminary results of the analysis of the data. Besides the newly established Topo-Iberia CGPS stations, we have included

  17. Effects of child restraint system features on installation errors.

    PubMed

    Klinich, Kathleen D; Manary, Miriam A; Flannagan, Carol A C; Ebert, Sheila M; Malik, Laura A; Green, Paul A; Reed, Matthew P

    2014-03-01

    This study examined how child restraint system (CRS) features contribute to CRS installation errors. Sixteen convertible CRS, selected to include a wide range of features, were used in volunteer testing with 32 subjects. Subjects were recruited based on their education level (high or low) and experience with installing CRS (none or experienced). Each subject was asked to perform four child restraint installations in the right-rear passenger seat of a 2006 Pontiac G6 sedan using a crash dummy as a child surrogate. Each subject installed two CRS forward-facing (FF), one with LATCH and one with the vehicle seatbelt, and two CRS rear-facing (RF), one with LATCH and one with the seatbelt. After each installation, the experimenter evaluated 42 factors for each installation, such as choice of belt routing path, tightness of installation, and harness snugness. Analyses used linear mixed models to identify CRS installation outcomes associated with CRS features. LATCH connector type, LATCH strap adjustor type, and the presence of belt lockoffs were associated with the tightness of the CRS installation. The type of harness shoulder height adjuster was associated with the rate of achieving a snug harness. Correct tether use was associated with the tether storage method. In general, subject assessments of the ease-of-use of CRS features were not highly correlated with the quality of their installation, suggesting a need for feedback with incorrect installations. The data from this study provide quantitative assessments of some CRS features that were associated with reductions in CRS installation errors. These results provide child restraint designers with design guidelines for developing easier-to-use products. Research on providing effective feedback during the child restraint installation process is recommended. PMID:23731627

  18. Effects of child restraint system features on installation errors.

    PubMed

    Klinich, Kathleen D; Manary, Miriam A; Flannagan, Carol A C; Ebert, Sheila M; Malik, Laura A; Green, Paul A; Reed, Matthew P

    2014-03-01

    This study examined how child restraint system (CRS) features contribute to CRS installation errors. Sixteen convertible CRS, selected to include a wide range of features, were used in volunteer testing with 32 subjects. Subjects were recruited based on their education level (high or low) and experience with installing CRS (none or experienced). Each subject was asked to perform four child restraint installations in the right-rear passenger seat of a 2006 Pontiac G6 sedan using a crash dummy as a child surrogate. Each subject installed two CRS forward-facing (FF), one with LATCH and one with the vehicle seatbelt, and two CRS rear-facing (RF), one with LATCH and one with the seatbelt. After each installation, the experimenter evaluated 42 factors for each installation, such as choice of belt routing path, tightness of installation, and harness snugness. Analyses used linear mixed models to identify CRS installation outcomes associated with CRS features. LATCH connector type, LATCH strap adjustor type, and the presence of belt lockoffs were associated with the tightness of the CRS installation. The type of harness shoulder height adjuster was associated with the rate of achieving a snug harness. Correct tether use was associated with the tether storage method. In general, subject assessments of the ease-of-use of CRS features were not highly correlated with the quality of their installation, suggesting a need for feedback with incorrect installations. The data from this study provide quantitative assessments of some CRS features that were associated with reductions in CRS installation errors. These results provide child restraint designers with design guidelines for developing easier-to-use products. Research on providing effective feedback during the child restraint installation process is recommended.

  19. CFPL installs products pipeline with directional drilling

    SciTech Connect

    1996-01-01

    Central Florida Pipeline Company (CFPL), a subsidiary of GATX Terminals Corp., Tampa, FL, has used directional drilling under seven water bodies in Hillsborough, Polk and Osceola Counties in constructing its new pipeline from Tampa to Orlando. Primary reason for using directional drilling is to protect the environment by minimizing water turbidity while the 16-inch diameter, 109-mile refined petroleum products pipeline is being installed. Total cost of the project is pegged at $68.5 million. Directional drilling enabled the pipe to be placed about 20 feet below the bottom of: The Alafia River in Riverview with 999 feet drilled; Port Sutton Channel near the Port of Tampa with 2,756 feet drilled; Reedy Creek Swamp at the intersection of Interstate 4 and Highway 192 which had 1,111 feet drilled; Wetland {number_sign}70 southwest of Lake Wales with 1,575 feet drilled; Peace River south of Bartow had 2,470 feet drilled; Bonnet Creek west of Kissimmee had 693 feet drilled. Shingle Creek near the borders of Osceola and Orange Counties with 1,700 feet drilled. This paper reviews the design plans for construction and the emergency response plans should a rupture occur in the line.

  20. Production Facility Prototype Blower Installation Report

    SciTech Connect

    Woloshun, Keith Albert; Dale, Gregory E.; Dalmas, Dale Allen; Romero, Frank Patrick

    2015-07-28

    The roots blower in use at ANL for in-beam experiments and also at LANL for flow tests was sized for 12 mm diameter disks and significantly less beam heating.  Currently, the disks are 29 mm in diameter, with a 12 mm FWHM Gaussian beam spot at 42 MeV and 2.86 μA on each side of the target, 5.72 μA total. The target design itself is reported elsewhere.  With the increased beam heating, the helium flow requirement increased so that a larger blower was need for a mass flow rate of 400 g/s at 2.76 MPa (400 psig).  An Aerzen GM 12.4 blower was selected, and is currently being installed at the LANL facility for target and component flow testing.  This report describes this blower/motor/ppressure vessel package and the status of the facility preparations.

  1. Gasket and snap ring installation tool

    DOEpatents

    Southerland, Jr., James M.; Barringer, Jr., Curtis N.

    1994-01-01

    A tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  2. Gasket and snap ring installation tool

    SciTech Connect

    Southerland, J.M. Jr.; Barringer, C.N. Jr.

    1994-09-06

    A tool is disclosed for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove. 6 figs.

  3. Gasket and snap ring installation tool

    SciTech Connect

    Southerland, J.M., Sr.; Barringer, C.N., Sr.

    1993-08-23

    This invention is comprised of a tool for installing a gasket and a snap ring including a shaft, a first plate attached to the forward end of the shaft, a second plate slidably carried by the shaft, a spring disposed about the shaft between the first and second plates, and a sleeve that is free to slide over the shaft and engage the second plate. The first plate has a loading surface with a loading groove for receiving a snap ring and a shoulder for holding a gasket. A plurality of openings are formed through the first plate, communicating with the loading groove and approximately equally spaced about the groove. A plurality of rods are attached to the second plate, each rod slidable in one of the openings. In use, the loaded tool is inserted into a hollow pipe or pipe fitting having an internal flange and an internal seating groove, such that the gasket is positioned against the flange and the ring is in the approximate plane of the seating groove. The sleeve is pushed against the second plate, sliding the second plate towards the first plate, compressing the spring and sliding the rods forwards in the openings. The rods engage the snap ring and urge the ring from the loading groove into the seating groove.

  4. 18 CFR 385.912 - Proposed findings of fact, conclusions of law, and comments (Rule 912).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Proposed findings of fact, conclusions of law, and comments (Rule 912). 385.912 Section 385.912 Conservation of Power and..., conclusions of law, and comments (Rule 912). (a) Within 10 days after the conclusion of the hearing, or, if...

  5. 18 CFR 385.912 - Proposed findings of fact, conclusions of law, and comments (Rule 912).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Proposed findings of fact, conclusions of law, and comments (Rule 912). 385.912 Section 385.912 Conservation of Power and..., conclusions of law, and comments (Rule 912). (a) Within 10 days after the conclusion of the hearing, or, if...

  6. 18 CFR 385.912 - Proposed findings of fact, conclusions of law, and comments (Rule 912).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Proposed findings of fact, conclusions of law, and comments (Rule 912). 385.912 Section 385.912 Conservation of Power and..., conclusions of law, and comments (Rule 912). (a) Within 10 days after the conclusion of the hearing, or, if...

  7. 39 CFR 964.14 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings of fact and conclusions of law... findings of fact and conclusions of law. (a) Each party to a proceeding, except one who fails to answer the..., submit proposed findings of fact, conclusions of law, orders and supporting reasons either in oral...

  8. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  9. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supportng reasons therefor. If the administrative...

  10. 49 CFR 386.57 - Proposed findings of fact, conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Proposed findings of fact, conclusions of law. 386... HAZARDOUS MATERIALS PROCEEDINGS General Rules and Hearings § 386.57 Proposed findings of fact, conclusions... proposed findings of fact, conclusions of law, and supportng reasons therefor. If the administrative...

  11. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... ISSUANCE OF ORDERS Informal Hearing Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions...

  12. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  13. 43 CFR 4.842 - Proposed findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Proposed findings of fact and conclusions... Posthearing Procedures § 4.842 Proposed findings of fact and conclusions of law. Within 30 days after the... of fact and conclusions of law together with supporting briefs. Such proposals and briefs shall...

  14. 30 CFR 44.31 - Proposed findings of fact, conclusions, and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Proposed findings of fact, conclusions, and... MANDATORY SAFETY STANDARDS Hearings § 44.31 Proposed findings of fact, conclusions, and orders. After... each party may file proposed findings of fact, conclusions of law, and rule or order, together with...

  15. 10 CFR 2.1209 - Findings of fact and conclusions of law.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Findings of fact and conclusions of law. 2.1209 Section 2... ISSUANCE OF ORDERS Informal Hearing Procedures for NRC Adjudications § 2.1209 Findings of fact and conclusions of law. Each party shall file written post-hearing proposed findings of fact and conclusions...

  16. 18 CFR 385.912 - Proposed findings of fact, conclusions of law, and comments (Rule 912).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Proposed findings of fact, conclusions of law, and comments (Rule 912). 385.912 Section 385.912 Conservation of Power and..., conclusions of law, and comments (Rule 912). (a) Within 10 days after the conclusion of the hearing, or, if...

  17. 18 CFR 385.912 - Proposed findings of fact, conclusions of law, and comments (Rule 912).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Proposed findings of fact, conclusions of law, and comments (Rule 912). 385.912 Section 385.912 Conservation of Power and..., conclusions of law, and comments (Rule 912). (a) Within 10 days after the conclusion of the hearing, or, if...

  18. Conclusions from a probabilistic safety analysis for FRJ-2 (DIDO) and realization of risk minimization measures

    SciTech Connect

    Wolters, J.; Nabbi, R.

    1997-12-01

    Feed and bleed cooling of the FRJ-2 research reactor can reduce the risk of core damage considerably as a probabilistic safety analysis has revealed. The question whether water circulation via the core would be maintained when the water in the tank has reached saturation point has been answered positively by an investigation with the thermohydraulic code CATHENA. A siphon with a water column and the special feature of self-acting restoration of the column after depressurization proved well during tests and will be installed as the relief equipment required to blow off the steam produced by the residual heat of the core during bleed cooling. 4 refs., 9 tabs.

  19. Preventive medicine oversight of splash pads on military installations.

    PubMed

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families.

  20. Results from inspections of farmer-installed rollover protective structures.

    PubMed

    Sorensen, Julie A; McKenzie, Tony; Purschwitz, Mark; Fiske, Todd; Jenkins, Paul L; O'Hara, Patrick; May, John J

    2011-01-01

    This study sought to assess the feasibility of self-installing rollover protective structures (ROPS) and to identify any patterns of self-installation deficiencies in a sample of New York ROPS Retrofit Rebate Program participants. Inspection engineers looked for/at damage, rust, holes, deteriorated welding, location of attachment, axle housing, the presence of original plates/bolts, and adequate seatbelt installation. Results indicated that only 31% of farmers received correct parts and also installed these parts properly. Ten percent of self-installed tractors had installation problems so severe they were referred to a dealer for correction. Issues with seatbelts, torque, and unmarked or defective bolts in ROPS kits were also detected. PMID:21213161

  1. Preventive medicine oversight of splash pads on military installations.

    PubMed

    Hardcastle, Lisa Raysby; Perry, Matthew; Browne, Ashley

    2015-01-01

    Over the past several years, an increasing number of military installations have installed splash pads that provide fun, recreational water entertainment for Soldiers and their families. The addition of splash pads brings added responsibilities for medical treatment facility preventive medicine oversight and installation facilities maintenance to ensure a safe and healthy environment. Currently, there are no consistent standards or detailed guidance for military installations to follow when installing and maintaining splash pads. The central issues associated with splash pads on military installations are water quality and risk for waterborne illnesses, responsibility for safety and health oversight, and federal energy and water sustainability mandates. This article examines the importance of implementing a standard for design and oversight to ensure the health and safety of Soldiers and their families. PMID:25651143

  2. Installation package for a Sunspot Cascade Solar Water Heating System

    SciTech Connect

    1980-09-01

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  3. Global Hawk instrument installation for GRIP hurricane mission

    NASA Video Gallery

    Technicians from NASA's Jet Propulsion Laboratory, Ames and Goddard field centers prepare and install specialized environmental monitoring instrumentation on NASA's Global Hawk No. 872 at the Dryde...

  4. 46 CFR 115.702 - Installation tests and inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... appliance, survival craft, rescue boat, fixed gas fire extinguishing system, machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial inspection for...

  5. 7. STONE PIER OF ORIGINAL WATERWHEEL INSTALLATION DOWNSTREAM FROM MILL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. STONE PIER OF ORIGINAL WATERWHEEL INSTALLATION DOWNSTREAM FROM MILL William E. Barrett, photographer, 1973 (copy negative) - Thomas Shepherd's Grist Mill, High Street Vicinity, Shepherdstown, Jefferson County, WV

  6. The Process of Installing REDCap, a Web Based Database Supporting Biomedical Research

    PubMed Central

    Mare, I.; Hazelhurst, S.; Kramer, B.

    2014-01-01

    Summary Background Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. Objectives In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. Methods We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Results Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. Conclusion REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and

  7. Design, Installation, and Initial Commissioning of the MTA Beamline

    SciTech Connect

    Moore, Craig; Anderson, John; Garcia, Fernanda; Gerardi, Michael; Johnstone, Carol; Kobilarcik, Thomas; Kucera, Michael; Kufer, Mathew; Newhart, Duane; Rakhno, Igor; Vogel, Gregory; /Fermilab

    2010-05-01

    A new experimental area designed to develop, test and verify muon ionization cooling apparatus using the 400-MeV Fermilab Linac proton beam has been fully installed and is presently being commissioned. Initially, this area was used for cryogenic tests of liquid-hydrogen absorbers for the MUCOOL R&D program and, now, for high-power beam tests of absorbers, high-gradient rf cavities in the presence of magnetic fields (including gas-filled cavities), and other prototype muon-cooling apparatus. The experimental scenarios being developed for muon facilities involve collection, capture, and cooling of large-emittance, high-intensity muon beams--{approx}10{sup 13} muons, so that conclusive tests of the apparatus require full Linac beam, which is 1.6 x 10{sup 13} p/pulse. To support the muon cooling facility, this new primary beamline extracts and transports beam directly from the Linac to the test facility. The design concept for the MuCool facility is taken from an earlier proposal [1], but modifications were necessary to accommodate high-intensity beam, cryogenics, and the increased scale of the cooling experiments. Further, the line incorporates a specialized section and utilizes a different mode of operation to provide precision measurements of Linac beam parameters. This paper reports on the technical details of the MuCool beamline for both modes.

  8. 26 CFR 41.6156-1 - Installment payments of tax on use of highway motor vehicle.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... accordance with the following table: If the liability was incurred in— 1st install-ment is due on or before the last day of— 2d install-ment is due on or before the last day of— 3d install-ment is due on or before the last day of— 4th install-ment is due on or before the last day of— July Aug Dec Mar June...

  9. 26 CFR 41.6156-1 - Installment payments of tax on use of highway motor vehicle.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accordance with the following table: If the liability was incurred in— 1st install-ment is due on or before the last day of— 2d install-ment is due on or before the last day of— 3d install-ment is due on or before the last day of— 4th install-ment is due on or before the last day of— July Aug Dec Mar June...

  10. Experimental Test of Momentum Cooling Model Predictions at COSY and Conclusions for WASA and HESR

    SciTech Connect

    Stockhorst, H.; Stassen, R.; Maier, R.; Prasuhn, D.; Katayama, T.; Thorndahl, L

    2007-11-07

    The High-Energy Storage Ring (HESR) of the future International Facility for Antiproton and Ion Research (FAIR) at GSI in Darmstadt is planned as an anti-proton cooler ring in the momentum range from 1.5 to 15 GeV/c. An important and challenging feature of the new facility is the combination of highly dense phase space cooled beams with internal targets. A detailed numerical and analytical approach to the Fokker-Planck equation for longitudinal filter cooling including the beam-target interaction has been carried out to demonstrate the stochastic cooling capability. To gain confidence in the model predictions a series of experimental stochastic cooling studies with the internal target ANKE at COSY have been carried out. A remarkable agreement between model and experiment was achieved. On this basis longitudinal stochastic cooling simulations were performed to predict the possibilities and limits of cooling when the newly installed WASA Pellet-target is operated.

  11. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meter installations: Operating pressure... Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure. (a) A meter may not be used at a pressure that is more than 67 percent of the manufacturer's...

  12. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  13. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  14. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  15. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction... this chapter. Systems of this type include the following: Steering systems. Power for going...

  16. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installed insulators. 75.516-1 Section 75.516-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks...

  17. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installed insulators. 75.516-1 Section 75.516-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks...

  18. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installed insulators. 75.516-1 Section 75.516-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks...

  19. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installed insulators. 75.516-1 Section 75.516-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks...

  20. 30 CFR 75.516-1 - Installed insulators.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installed insulators. 75.516-1 Section 75.516-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... insulators. Well-insulated insulators is interpreted to mean well-installed insulators. Insulated J-hooks...