Science.gov

Sample records for installations nucleaires conclusions

  1. Sweet Conclusion

    ERIC Educational Resources Information Center

    Shirley, Britt M.; Wooldridge, Barbara Ross; Camp, Kerri M.

    2012-01-01

    Jen Harrington is the owner and pastry chef of Sweet Conclusion, a bakery in Tampa, Florida. Most of Harrington's business comes from baking wedding cakes, but she has been attempting to attract customers to her retail bakery, where she sells cupcakes, pies, ice cream, and coffee. Nearly four years she opened Sweet Conclusion, the retail part of…

  2. Sweet Conclusion

    ERIC Educational Resources Information Center

    Shirley, Britt M.; Wooldridge, Barbara Ross; Camp, Kerri M.

    2012-01-01

    Jen Harrington is the owner and pastry chef of Sweet Conclusion, a bakery in Tampa, Florida. Most of Harrington's business comes from baking wedding cakes, but she has been attempting to attract customers to her retail bakery, where she sells cupcakes, pies, ice cream, and coffee. Nearly four years she opened Sweet Conclusion, the retail part of…

  3. Some Conclusions

    ERIC Educational Resources Information Center

    Newby, Mike

    2005-01-01

    How can one be conclusive about something which has not yet happened? How can one come to conclusions about something as insubstantial as the medium-term future? Nonetheless, some common themes have emerged from the Spring Colloquium, as well as from earlier work in the "Teaching 2020" project, which seem to indicate a possible context for the…

  4. Beginning without a Conclusion.

    ERIC Educational Resources Information Center

    Frazier, Richard

    1988-01-01

    Describes a series of activities without conclusions to introduce scientific reasoning in a ninth grade physical science course. Uses popcorn popping to get students to think about the concepts of graphing, histograms, frequency, probability, and scientific methodology. (CW)

  5. Conclusions

    Treesearch

    David L. Peterson; James M. Vose

    2012-01-01

    Forest ecosystems in the United States in the year 2100 will differ from those of today as a result of a changing climate. Those differences will be superimposed on the human imprint of forest management and the legacies of other land use activities, stressors, and disturbances of the 19th and 20th centuries. Future changes in forest ecosystems will occur across both...

  6. Conclusion

    NASA Astrophysics Data System (ADS)

    Ivancevic, Vladimir G.; Reid, Darryn J.

    2015-11-01

    It is often held that things should always be made simple, which presumes that either that they can always be made simple or that all the jetisoned logic doesn't matter anyway. Alledgedly, anything should be explainable so that anyone can understand it. Don't get bogged down in dreary details. It should be effortless for the reader: low-dimensional systems exhibit complex behaviour while high-dimensional systems exhibit simple behaviour (to return to our prolegomonal opening), competition is a universal solution, demand must increase as price falls, and everything under the sun neatly fits a power law. Or so the story goes...

  7. Conclusions

    NASA Astrophysics Data System (ADS)

    Binder, P.-M.; Smith, K.

    If you made it to this point, this is what we have tried to offer you: a view of language like no other book has provided before. It is quite possible that this is one of very few books you have read on the subject; it could even be your first. Chances are that those you have read were written for a general audience. Some of them are very good, but they usually try to push a particular viewpoint of their author. Or you may have followed an introductory linguistics course at the university level. Such courses, and their textbooks, focus on technical aspects of the subject: the details of theories of phonology, syntax, semantics and so on. Knowledge of all of these areas is absolutely necessary for a deep understanding of the subject. But both single-author general books and technical textbooks have the same shortcoming: they do not give the reader a broad and complete account of how language works.

  8. Conclusion

    NASA Technical Reports Server (NTRS)

    Arnold, Steven M.; Wong, Terry T.

    2011-01-01

    This compilation of papers in this book represents approximately half of the works discussed at the MS&T 2010 symposium entitled Tools, Models, Databases, and Simulation Tools Developed and Needed to Realize the Vision of Integrated Computational Materials Engineering at Materials Science & Technology wherein five sessions comprised of 33 presentations was organized. The goal of the symposium was two fold To provide a forum in which current state-of-the-art methods for ICME (e.g., information informatics, experimentation, and modeling) could be openly discussed and critiqued by not only materials scientist but also structural engineers/researchers, component designers, industrial leaders and government program managers. To leave the symposium and in particular the panel discussion with a clear idea of the gaps and barriers (both technical, cultural and economical) that must be addressed in order for ICME to fully succeed. The organizers felt that these goals were met, as particularly evident by the standing room only attendance during a lively panel discussion session at the end of the Symposium. However it is the firm belief of the editors of this book that this symposium was merely a start in the right direction, and that subsequent conferences/symposium (e.g., First World Congress on Integrated Computational Materials Engineering to be held July 10-14, 2011 at Seven Springs Mountain Resort in Pennsylvania) must work hard to ensure that a truly diverse, multidisciplinary, community of researchers and practitioners are present and have ample opportunity for interaction. This will ensure that a proper balance between push and pull disciplines and technologies is maintained so that this emerging focus area, Integrated Computational Materials Engineering (ICME), has the greatest potential for success and impact on "system-level" payoffs. Similarly, a pro-active approach is required to reform historical modes of operation in industry, government and the academic sectors so as to facilitate multidisciplinary collaboration and to clearly articulate the vision and scope of ICME.

  9. Conclusion

    NASA Technical Reports Server (NTRS)

    Arnold, Steven M.; Wong, Terry T.

    2011-01-01

    This compilation of papers in this book represents approximately half of the works discussed at the MS&T 2010 symposium entitled Tools, Models, Databases, and Simulation Tools Developed and Needed to Realize the Vision of Integrated Computational Materials Engineering at Materials Science & Technology wherein five sessions comprised of 33 presentations was organized. The goal of the symposium was two fold To provide a forum in which current state-of-the-art methods for ICME (e.g., information informatics, experimentation, and modeling) could be openly discussed and critiqued by not only materials scientist but also structural engineers/researchers, component designers, industrial leaders and government program managers. To leave the symposium and in particular the panel discussion with a clear idea of the gaps and barriers (both technical, cultural and economical) that must be addressed in order for ICME to fully succeed. The organizers felt that these goals were met, as particularly evident by the standing room only attendance during a lively panel discussion session at the end of the Symposium. However it is the firm belief of the editors of this book that this symposium was merely a start in the right direction, and that subsequent conferences/symposium (e.g., First World Congress on Integrated Computational Materials Engineering to be held July 10-14, 2011 at Seven Springs Mountain Resort in Pennsylvania) must work hard to ensure that a truly diverse, multidisciplinary, community of researchers and practitioners are present and have ample opportunity for interaction. This will ensure that a proper balance between push and pull disciplines and technologies is maintained so that this emerging focus area, Integrated Computational Materials Engineering (ICME), has the greatest potential for success and impact on "system-level" payoffs. Similarly, a pro-active approach is required to reform historical modes of operation in industry, government and the academic sectors so as to facilitate multidisciplinary collaboration and to clearly articulate the vision and scope of ICME.

  10. Conclusions

    NASA Astrophysics Data System (ADS)

    Ahonen, Pasi; Alahuhta, Petteri; Daskala, Barbara; Delaitre, Sabine; Hert, Paul De; Lindner, Ralf; Maghiros, Ioannis; Moscibroda, Anna; Schreurs, Wim; Verlinden, Michiel

    Some say that an increase in security does not necessarily mean a further encroachment on privacy - indeed, security is necessary to protect personal data and our privacy. Networks must be secure, our personal devices, reliable, dependable and trustworthy. But security is a multifaceted term, with many dimensions. We are of the view that an increase in security most likely will encroach upon our privacy in an ambient intelligence world. Surveillance cameras will continue to proliferate. We assume that, whatever the law is, whatever privacy protections government and business say they honour, our telecommunications, e-mails and Internet usage will be monitored to an increasing degree. The same will be true of our interfaces with the world of ambient intelligence.

  11. Wheel Installation

    NASA Image and Video Library

    2010-07-07

    In this picture, the Curiosity rover sports a set of six new wheels. The wheels were installed on June 28 and 29 in the Spacecraft Assembly Facility at NASA Jet Propulsion Laboratory, Pasadena, Calif.

  12. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  13. Conclusions. [hydrogen-based energy

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Conclusions are presented according to general areas of technology with some specific examples of research and technology needs identified. These conclusions provide a base for the future development of detailed program plans and identify research needs that are not being given attention or are not being supported at a sufficient level. Emphasis is placed on hydrogen production and use.

  14. Using a Laboratory Conclusion Rubric

    ERIC Educational Resources Information Center

    Rutherford, Sandra

    2007-01-01

    Adding a strong conclusion can alter a cookbook lab into an inquiry lab by challenging the student to defend relevant data and clearly communicate his or her findings. A well-organized scoring guide makes it easier for students to understand what is involved in writing a strong conclusion. Examples of student writing that are accompanied with the…

  15. Summary and conclusions [Chapter 11

    Treesearch

    Daniel G. Neary; John N. Rinne; Alvin L.. Medina

    2012-01-01

    Summaries and conclusions of each chapter are compiled here to provide a “Quick Reference” guide of major results and recommendations for the UVR. More detail can be obtained from individual chapters.

  16. Conclusions and Recommendations. Chapter 37

    NASA Technical Reports Server (NTRS)

    Lamar, John E.; Hummel, Dietrich

    2009-01-01

    This chapter provides a brief wrap-up of the task group report and focuses on the overall conclusions and recommendations for future work for the CAWAPI and VFE-2 facets beyond the task group. The overall conclusion is that the Technology Readiness Level (TRL) of CFD solvers has been improved in predicting the flow-physics of vortex-dominated flows during the work of the task group, by having flight and wind-tunnel data available for comparison. Moreover, like all good scientific studies, this task group has identified flight conditions on the F-16XL airplane or wind-tunnel test conditions for a specific leading-edge radius on the 65 delta-wing model where the TRL still needs to be increased.

  17. Conclusions and Recommendations. Chapter 37

    NASA Technical Reports Server (NTRS)

    Lamar, John E.; Hummel, Dietrich

    2009-01-01

    This chapter provides a brief wrap-up of the task group report and focuses on the overall conclusions and recommendations for future work for the CAWAPI and VFE-2 facets beyond the task group. The overall conclusion is that the Technology Readiness Level (TRL) of CFD solvers has been improved in predicting the flow-physics of vortex-dominated flows during the work of the task group, by having flight and wind-tunnel data available for comparison. Moreover, like all good scientific studies, this task group has identified flight conditions on the F-16XL airplane or wind-tunnel test conditions for a specific leading-edge radius on the 65 delta-wing model where the TRL still needs to be increased.

  18. [SENTIERI Project: discussion and conclusions].

    PubMed

    Pirastu, Roberta; Ricci, Paolo; Comba, Pietro; Bianchi, Fabrizio; Biggeri, Annibale; Conti, Susanna; Fazzo, Lucia; Forastiere, Francesco; Iavarone, Ivano; Martuzzi, Marco; Musmeci, Loredana; Pasetto, Roberto; Zona, Amerigo; Crocetti, Emanuele

    2014-01-01

    showing the increase, considering latency and the length of the observation period. Of further interest are results relating to diseases of the urinary tract such as kidney failure in the NPCSs of Basso bacino del fiume Chienti, Taranto, Milazzo and Priolo. Overall, the results discussed above are consistent with the previous findings pertaining to mortality for 1995-2002. The present analysis also introduces a new element - the study of cancer incidence and hospital discharges - which can tell us a great deal about diseases with high survival rates or non lethal ones. The first is the case of thyroid cancer, which presents increases in both databases and for both genders in a number of NPCSs (Brescia-Caffaro, Laghi di Mantova, Milazzo, Sassuolo- Scandiano and Taranto). The study of cancer incidence and hospital discharges also revealed cancer excesses for melanoma, breast cancer and non Hodgkin lymphoma in Brescia-Caffaro NPCS where PCBs (Polychlorinated biphenyl) are the site's main pollutant. PCBs, according to the 2013 evaluation of the International Agency for Research on Cancer, are ascertained human carcinogens for melanoma and probable carcinogens for breast cancer and non-Hodgkin lymphoma. The results pertaining to cancer incidence in the 17 NPCSs can also be presented using rankings by area or disease analyzed by a multivariate hierarchical Bayesian model. These rankings reveal an overlapping of credibility intervals, such that it is not possible to speak of a limited number of cancer sites or of certain NPCSs as being particularly affected. Every NPCS, therefore, must be considered individually and ordering them by ranking of cancer incidence wouldn't be appropriate. Data collected concerning some of the NPCSs in the context of the SENTIERI Project is so conclusive that remediation measures can immediately be put in place. This is the case in the Biancavilla and Brescia-Caffaro NPCSs. A similar conclusion can be drawn for complex locations such as Taranto

  19. Hopkins installs wire harnesses

    NASA Image and Video Library

    2013-11-24

    ISS038-E-008291 (24 Nov. 2013) --- NASA astronaut Michael Hopkins, Expedition 38 flight engineer, installs wire harnesses in the International Space Station?s Harmony node to support the installation of Ethernet video cables for the station?s local area network. These new cables will provide Ethernet connectivity to the visiting vehicles that dock to Harmony?s Earth-facing port.

  20. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  1. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is prepared for installation Oct. 24, 2010, at John C. Stennis Space Center. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  2. AMS Time Lapse Installation

    NASA Image and Video Library

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  3. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  4. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014934 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  5. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014979 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  6. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014956 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  7. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014973 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  8. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014952 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  9. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014930 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  10. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014981 (17 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  11. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting, lowering and installation. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are eight levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Installing Juno Radiation Vault

    NASA Image and Video Library

    2010-07-12

    Technicians installed a special radiation vault onto the propulsion module of NASA Juno spacecraft. Each titanium wall measures nearly a square meter nearly 10 square feet in area and about 1 centimeter a third of an inch in thickness.

  15. LH tank installation

    NASA Image and Video Library

    2011-07-25

    Stennis Space Center employees marked another construction milestone July 25 with installation of the 85,000-gallon liquid hydrogen tank atop the A-3 Test Stand. The 300-foot-tall stand is being built to test next-generation rocket engines that could carry humans into deep space once more. The liquid hydrogen tank and a 35,000-gallon liquid oxygen tank installed atop the steel structure earlier in June will provide fuel propellants for testing the engines.

  16. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, construction workers assist with the installation of the final work platform, A north, in High Bay 3, as a crane lowers the platform into place. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  17. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the final work platform, A north, for installation in High Bay 3. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. In view on the platform are the American flag and a small tree. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  18. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  20. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, has been lowered into place for installation on the north wall of High Bay 3. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  1. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines prepares to assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  2. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines monitors the progress during the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  3. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines turns a bolt to help secure the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, during installation in High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The B platform is being installed on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  5. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines assists with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view below are the six levels of previously installed platforms. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  8. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  9. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle. The platform will be moved into High Bay 3 for installation on the south side of the high bay. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  10. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In this view looking up in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  12. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, is lowered into position for installation on the north side of High Bay 3. In view below are the seven levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. LOX tank installation

    NASA Image and Video Library

    2011-06-08

    Construction of the A-3 Test Stand at Stennis Space Center continued June 8 with installation of a 35,000-gallon liquid oxygen tank atop the steel structure. The stand is being built to test next-generation rocket engines that will carry humans into deep space once more. The LOX tank and a liquid hydrogen tank to be installed atop the stand later will provide propellants for testing the engines. The A-3 Test Stand is scheduled for completion and activation in 2013.

  15. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is hoisted into place at the E-2 Test Stand at John C. Stennis Space Center on Oct. 24, 2010. The unit was installed at the E-2 stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  16. CSG delivery and installation

    NASA Image and Video Library

    2010-10-22

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand arrived at John. C. Stennis Space Center on Oct. 22, 2010. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  17. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    John C. Stennis Space Center employees complete installation of a chemical steam generator (CSG) unit at the site's E-2 Test Stand. On Oct. 24, 2010. The unit will undergo verification and validation testing on the E-2 stand before it is moved to the A-3 Test Stand under construction at Stennis. Each CSG unit includes three modules. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  18. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist during installation of the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  19. T2 Install Operations

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043639 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  20. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    A close-up view of an American flag and a small tree on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  1. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag and a small tree are in view on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  2. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag can be seen hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  3. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    In a view from below, the American flag is in view hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  4. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  5. Solenoidal Magnet Installation

    SciTech Connect

    Stredde, H.; Lee, A.; /Fermilab

    1998-01-21

    The major modification to the D0 detector for the next physics collider run is the upgrade of the central tracking system. The first component to be installed will be the solenoid magnet, with the central pre-shower attached. This engineering note is directed to the installation of the solenoid magnet and the equipment needed to accomplish this task. As part of the installation process, the main detector must undergo a change in position of one of its major components, namely the South End Calorimeter (SEC). This calorimeter must be completely decoupled from the main detector, i.e. all cabling and cryo lines removed. The equipment used for installing all calorimeters (bridge and support structures) will be put into position and the calorimeter (SEC) will be pulled off of the detector center beam and parked on the south sidewalk of the D0 Assembly Hall. The necessary cryo lines will re-connected in order to keep the cryostat cold. This calorimeter will remain here during the greater portion of the upgrade reconfiguration schedule. When this task is finished, the old central tracking system and its mounts will be removed from the bore of the Central Calorimeter (CC). The main detector is now ready to receive the new tracking system, starting with the solenoid magnet.

  6. Leadership for Sustainable Installations

    DTIC Science & Technology

    2011-04-01

    leading sustainable installations. What is Sustainability? Sustainability has its roots in the business world in the concept of corporate social ... responsibility (CSR). Cynics may say the CSR was a marketing ploy to establish a positive public perception of businesses in the wake of several well

  7. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  8. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, up from the floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  9. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  10. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be lowered into High Bay 3 for installation on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  13. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A crane lifts the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, high up in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B north platform will lowered into High Bay 3 for installation on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lifted up by crane in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be lowered into High Bay 3 and installed on the north side of the high bay. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    High up in High Bay 3 inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, has been lowered into place. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  17. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker makes adjustments to a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers use specialized tools to help secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  19. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  20. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers help to secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  1. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A construction worker monitors the progress, as a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  2. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  3. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    In this view from above, a heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  4. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  5. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Mineral mining installations

    SciTech Connect

    Werner, G.; Wisniewski, P.

    1983-12-15

    A mineral mining installation serves to win mineral by explosive blasting. The installation employs a shuttle conveyor arranged alongside a mineral face. Roof supports stand side-by-side at the side of the conveyor remote from the conveyor. The roof supports are connected to the conveyor through shifting rams and have roof-engageable caps or the like supported on hydraulic props. The pans of the conveyor have upstanding walls at the rear side nearest the roof supports which carry rails at their upper ends. The roof caps have wall components pivoted thereto and hydraulic piston and cylinder units serve to swing the wall components up and down. When explosive blasting takes place the wall components are swung down to engage on the walls of the conveyor pans to form a screen between the winning region and the access region of the working.

  10. Engineering and Installation Services

    DTIC Science & Technology

    2007-11-02

    Update data on existing communications and information systems on the Communica- tions and Information Systems Installation Records ( CSIR ) according to...information by two different survey methods: desk top and on-site. 4.9.1.1. Perform desktop surveys by using CSIRs , available data, and telephone...and equipment. 4.15. Project Drawings . Upon project completion, the team chief annotates two sets of CSIR drawings. The team chief leaves one set with

  11. Samus Toroid Installation Fixture

    SciTech Connect

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  12. 4.11 Summary and Conclusions

    NASA Astrophysics Data System (ADS)

    Noßke, D.; Mattsson, S.; Johansson, L.

    This document is part of Subvolume A 'Fundamentals and Data in Radiobiology, Radiation Biophysics, Dosimetry and Medical Radiological Protection' of Volume 7 'Medical Radiological Physics' of Landolt-Börnstein - Group VIII 'Advanced Materials and Technologies'. It contains the Section '4.11 Summary and Conclusions' of the Chapter '4 Dosimetry in Nuclear Medicine Diagnosis and Therapy'.

  13. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  14. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  15. Cults and mental health: clinical conclusions.

    PubMed

    Levine, S V

    1981-12-01

    The field of cults and their relation to psychological and psychiatric disorder is reft with rhetoric and opinion. There has been a particular dearth of documentation and substantiated data supporting psychiatric opinion. As a result of considerable research, clinical work, and an extensive literature review, certain conclusions or strongly suggested positions are enunciated. An attempt is made to substantiate each of the ten assertions based on existing data, in the hope that they will clarify the muddy existing data, area, make clinical positions and interventions more soundly based, and inspire debate and heuristic efforts.

  16. Epistemology applied to conclusions of expert reports.

    PubMed

    Lucena-Molina, Jose-Juan

    2016-07-01

    It is believed that to build a robust reasoning logic to make probabilistic inferences in forensic science from a merely mathematical or logistical viewpoint is not enough. Mathematical logic is the positive science of reasoning and as for that it is only interested in the positive calculus of its validity, regardless any prior ontological assumption. But without a determined ontology and epistemology which imply to define the concepts that they will use, it seems difficult that the proposed scientifically correct mathematical solution be successful as a European standard for making conclusions in forensic reports because it has to be based on judicial language. Forensic experts and Courts are not interested in the development of a positive science but in a practical science: in clarifying whether certain known facts are related to a possible crime. Therefore, not only the coherence of the demonstrative logic reasoning used (logic of propositions) is important, but also the precision of the concepts used by language and consistency among them in reasoning (logic of concepts). There is a linguistic level essential for a successful communication between the forensic practitioner and the Court which is mainly related, in our opinion, to semantics and figures of speech. The first one is involved because words used in forensic conclusions often have different meanings - it is said that they are polysemic - and the second one because there is often metonymy as well. Besides, semantic differences among languages regarding words with the same etymological root add another difficulty for a better mutual understanding. The two main European judicial systems inherit a wide and deep culture related to evidence in criminal proceedings and each of them has coined their own terminology but there are other two more abstract levels such as logical and epistemological, where we can find solid arguments by which terms used at legal level on conclusions of forensic reports could be

  17. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  18. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  19. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  20. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  1. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    Inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, a construction worker watches as the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket is lowered into place in High Bay 3. Construction workers will secure the large bolts that hold the platform in place on the south wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  2. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  3. CATS Installed on ISS

    NASA Image and Video Library

    2017-09-28

    On Jan. 22, 2015, robotic flight controllers successfully installed NASA’s Cloud Aerosol Transport System (CATS) onboard the International Space Station. CATS will collect data about clouds, volcanic ash plumes and tiny airborne particles that can help improve our understanding of aerosol and cloud interactions, and improve the accuracy of climate change models. CATS had been mounted inside the SpaceX Dragon cargo craft’s unpressurized trunk since it docked at the station on Jan. 12. Ground controllers at NASA’s Johnson Space Center in Houston, Texas, used one of the space station’s robotic arms, called the Special Purpose Dexterous Manipulator, to extract the instrument from the capsule. The NASA-controlled arm passed the instrument to a second robotic arm— like passing a baton in a relay race. This second arm, called the Japanese Experiment Module Remote Manipulator System, is controlled by the Japanese Aerospace Exploration Agency. The Japanese-controlled arm installed the instrument to the Space Station’s Japanese Experiment Module, making CATS the first NASA-developed payload to fly on the Japanese module. CATS is a lidar remote-sensing instrument designed to last from six months to three years. It is specifically intended to demonstrate a low-cost, streamlined approach to developing science payloads on the space station. CATS launched aboard the SpaceX Dragon spacecraft on Jan. 10 at Cape Canaveral Air Force Station in Florida. To learn more about the impact of CATS data, visit: www.nasa.gov/cats/ NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  4. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  5. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  6. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  7. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  8. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  9. Nuclear reactor installation

    SciTech Connect

    Straub, H.

    1987-09-29

    A nuclear reactor installation is described comprising a pressure vessel having a pair of concentric walls defining a peripheral chamber therebetween; a reactor core disposed within the pressure vessel for heating a primary coolant; a cooling circuit for conveying a secondary coolant in heat exchange relation with the primary coolant. The circuit includes at least one primary heat exchanger within the pressure vessel, at least one secondary heat exchanger outside the pressure vessel, coolant lines extending through the pressure vessel and connecting the heat exchanges together, and circulating means for circulating a secondary coolant through the heat exchangers; a heat sink extending around the pressure vessel; a source of at least one flowable heat-insulating agent outside the pressure vessel; a source of at least one flowable heat-conductive agent outside the pressure vessel; first means communicating the source of heat-insulating agent with the peripheral chamber during normal operation of the reactor core; and second means communicating the source of heat-conductive agent with the peripheral chamber to fill the chamber with heat-conductive agent in response to a disturbance in reactor core cooling.

  10. Mineral mining installation

    SciTech Connect

    Weirich, W.

    1984-01-24

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a springloaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  11. Mineral mining installation

    SciTech Connect

    Becker, K.; Rosenberg, H.; Weirich, W.

    1981-12-29

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (Either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a spring-loaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  12. Antares Fairing Installed

    NASA Image and Video Library

    2017-09-27

    The payload fairing is installed on the Orbital Sciences Antares rocket at the Horizontal Integration Facility at NASA's Wallops Flight Facility on Virginia's Eastern Shore, Tuesday, July 8, 2014. The Antares rocket is scheduled to roll-out to Virginia's Mid-Atlantic Regional Spaceport Pad 0A Wednesday, July 9, ahead of its scheduled launch July 11. The Antares rocket will carry Orbital's unmanned Cygnus spacecraft to the International Space Station. This Orbital-2 mission's cargo is more than 3,000 pounds of supplies for the station, including science experiments to expand the research capability of the Expedition 40 crew members aboard the orbiting laboratory, crew provisions, spare parts and experiment hardware. Credit: NASA's Wallops Flight Facility NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  13. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  14. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  15. FDDI Installation and Performance Analysis

    DTIC Science & Technology

    1992-12-01

    controlled by a Motorola 68030 32-bit microprocessor which controls all of the onboard functions. The LANplex 5012 has 12 expansion slots on an...27 March 1990. [14] Sun FDDI/DX Software and Hardware Installation Guide. [15] LANplex 5004 and 5012 Installation Guide. [16] M68000 8-/16-132-Bit

  16. Smoke Alarm Giveaway and Installation Programs

    PubMed Central

    Liu, Ying; Mack, Karin A.; Diekman, Shane T.

    2015-01-01

    Background The burden of residential fire injury and death is substantial. Targeted smoke alarm giveaway and installation programs are popular interventions used to reduce residential fire mortality and morbidity. Purpose To evaluate the cost effectiveness and cost benefit of implementing a giveaway or installation program in a small hypothetic community with a high risk of fire death and injury through a decision-analysis model. Methods Model inputs included program costs; program effectiveness (life-years and quality-adjusted life-years saved); and monetized program benefits (medical cost, productivity, property loss and quality-of-life losses averted) and were identified through structured reviews of existing literature (done in 2011) and supplemented by expert opinion. Future costs and effectiveness were discounted at a rate of 3% per year. All costs were expressed in 2011 U.S. dollars. Results Cost-effectiveness analysis (CEA) resulted in anaverage cost-effectiveness ratio (ACER) of $51,404 per quality-adjusted life-years (QALYs) saved and $45,630 per QALY for the giveaway and installation programs, respectively. Cost–benefit analysis (CBA) showed that both programs were associated with a positive net benefit with a benefit–cost ratio of 2.1 and 2.3, respectively. Smoke alarm functional rate, baseline prevalence of functional alarms, and baseline home fire death rate were among the most influential factors for the CEA and CBA results. Conclusions Both giveaway and installation programs have an average cost-effectiveness ratio similar to or lower than the median cost-effectiveness ratio reported for other interventionsto reduce fatal injuries in homes. Although more effort is required, installation programs result in lower cost per outcome achieved compared with giveaways. PMID:22992356

  17. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  18. Installing Electronics in Juno Vault

    NASA Image and Video Library

    2010-12-16

    Technicians install components that will aid with guidance, navigation and control of NASA Juno spacecraft. Like most of Juno sensitive electronics, these components are situated within the spacecraft titanium radiation vault.

  19. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043691 (30 Sept. 2009) --- NASA astronaut Nicole Stott, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  20. Achieving Efficiencies in Army Installations.

    DTIC Science & Technology

    2007-11-02

    34" ’■■"■" 1 USAWC STRATEGY RESEARCH PROJECT Achieving Efficiencies in Army Installations by Richard Fliss Col. Richard M. Meinhart Project...government agency. STRATEGY RESEARCH PROJECT ACHIEVING EFFICIENCIES IN ARMY INSTALLATIONS BY RICHARD FLISS DISTRIBUTION STATEMENT A: Approved...for public release. Distribution is unlimited. DTIC QUALITY INSPECTED & USAWC CLASS OF 1998 U.S. ARMY WAR COLLEGE, CARLISLE BARRACKS, PA 17013-5050

  1. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  2. Installation Restoration Program Records Search for Kingsley Field, Oregon.

    DTIC Science & Technology

    1982-06-01

    Environmentally Sensitive Conditions 22 IV. -FINDINGS’ 25 A. Activity Review 25 B. Disposal Sites Identification and Rating 30 V. *’CONCLUSIONS...To implement the DOD policy, a three-phase Instal- lation Restoration Program has been directed. Phase I, the Records Search, is the identification of...environmental hazards. B. Authority Identification of hazardous waste disposal sites at military installations was directed by Defense Environmental

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  4. Gas appliance and installation quality

    SciTech Connect

    Dance, E.W.G.; Mulholland, P.M.

    1988-01-01

    British Gas plc only sells and installs domestic gas appliances which conform to the requirements of a third party certification scheme. This involves type testing of appliance prototypes, assessment of the manufacturers quality system and quality auditing of production appliances. This certification is augmented by additional quality auditing of appliances both in the factory and at British Gas warehouses. In order to achieve the quality objectives of safety and customer satisfaction comprehensive installation procedures and practices have been developed which are designed to deal with large installation and servicing workload. The quality standards achieved are independently assessed by market research into customers reactions. This competence of service engineers is maintained and enhanced by regular training and education and high standards of performance at regional and local level are rewarded through annual national competitions.

  5. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  6. Aasgard subsea installation on schedule

    SciTech Connect

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  7. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  8. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043681 (30 Sept. 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  9. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  10. Rack installation in the JPM

    NASA Image and Video Library

    2008-06-04

    S124-E-006279 (4 June 2008) --- Japan Aerospace Exploration Agency (JAXA) astronaut Akihiko Hoshide, STS-124 mission specialist, smiles for a photo as he works in the newly installed Kibo Japanese Pressurized Module (JPM) of the International Space Station while Space Shuttle Discovery is docked with the station.

  11. Vessels installed at A-3

    NASA Image and Video Library

    2009-09-25

    Construction of the A-3 Test Stand approaches another milestone with delivery and installation of water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks. The three LOX tanks shown on the left and the two IPA tanks shown on the right are all 35,000 gallons each. The four water tanks in the center are 39,000 gallons each.

  12. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  13. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  14. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  15. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  16. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  17. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  18. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  19. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  20. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  1. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  2. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  3. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  4. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  5. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  6. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  7. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  8. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  9. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  10. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  11. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  12. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  13. Engineering report for simulated riser installation

    SciTech Connect

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  14. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not submitted...

  15. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not submitted...

  16. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not submitted...

  17. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not submitted...

  18. 39 CFR 954.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 954.18 Section... and conclusions. (a) A party to a proceeding may submit proposed findings of fact and conclusions of... conclusions of law with supporting reasons. When the proposed findings and conclusions are not submitted...

  19. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043705 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne (left foreground) and Canadian Space Agency astronaut Robert Thirsk (center foreground); along with NASA astronauts Nicole Stott and Michael Barratt, all Expedition 20 flight engineers, pose for a photo with the newly installed Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  20. Mounting clips for panel installation

    DOEpatents

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  1. Simplified installation of thrust bearings

    NASA Technical Reports Server (NTRS)

    Sensenbaugh, N. D.

    1980-01-01

    Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.

  2. SSOD Removal and NRCSD Install

    NASA Image and Video Library

    2014-01-30

    ISS038-E-040103 (30 Jan. 2014) --- Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, prepares to install a Cubesat deployer, also known as the Small Satellite Orbital Deployer (SSOD), inside the airlock in the International Space Station's Kibo laboratory. The SSOD is scheduled to release a set of six tiny satellites known as NanoRacks Cubesats on Feb. 6. The Cubesats were delivered Jan. 12 aboard Orbital Sciences' Cygnus commercial cargo craft.

  3. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  4. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  5. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES OF PRACTICE Hearings § 10.82 Proposed findings and conclusions; briefs. In any proceeding... and conclusions of law. Briefs may be filed in support of proposed findings and conclusions either as...

  6. Emotion in Painting and Art Installations.

    PubMed

    Konečni, Vladimir J

    2015-01-01

    Paintings are static 2-dimensional images with limited narrative means. On the basis of a critical analysis of the relevant laboratory scaling studies, museum studies, and neuroaesthetic work, the article reaches a negative conclusion about most paintings' ability to engage sufficiently with general viewers' associative-memory systems, so as to lead to identification and empathy, and induce fundamental psychobiological emotions. In contrast, designers of art installations can draw on subtle combinations of several classes of stimulus properties with psychological significance subsumable under the classical concept of the sublime (physical grandeur, rarity, an association with beauty and with biologically significant outcomes), so that some installations may induce the peak aesthetic emotional response, aesthetic awe--as defined in Aesthetic Trinity Theory (Konečni, 2005, 2011), along with the states of being moved and physiological thrills. The approach also involves an analytical skepticism about emotivism, defined as a culturological proclivity for unnecessary insertion of emotion into accounts of mental life and behavior, especially in the arts. Implications for the role of emotion theory in empirical aesthetics are examined.

  7. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  8. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  9. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  10. Installation of Curiosity Wheels and Suspension

    NASA Image and Video Library

    2010-07-05

    With the wheels and suspension system already installed onto one side of NASA Mars rover Curiosity the previous day, spacecraft engineers and technicians prepare the other side mobility subsystem for installation on June 29, 2010.

  11. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  12. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  13. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  14. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  15. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  16. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  17. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  18. EVA 5 - Grunsfeld installs radiator

    NASA Image and Video Library

    2002-03-08

    STS109-315-007 (8 March 2002) --- Astronaut John M. Grunsfeld, STS-109 payload commander, anchored on the end of the Space Shuttle Columbia’s Remote Manipulator System (RMS) robotic arm, moves toward the giant Hubble Space Telescope (HST) temporarily hosted in the orbiter’s cargo bay. Astronaut Richard M. Linnehan (out of frame) works in tandem with Grunsfeld during this fifth and final session of extravehicular activity (EVA). Activities for the space walk centered around the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) to install a Cryogenic Cooler and its Cooling System Radiator.

  19. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and supporting...

  20. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The Presiding...

  1. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor. ...

  2. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge. ...

  3. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 1 2011-04-01 2011-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings as...

  4. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor. ...

  5. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of proposed...

  6. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 1 2011-10-01 2011-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided, however...

  7. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of the...

  8. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together with...

  9. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of proposed...

  10. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed rule...

  11. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 1 2014-10-01 2014-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided, however...

  12. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of proposed...

  13. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 1 2013-10-01 2013-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided, however...

  14. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed rule...

  15. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of law...

  16. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons...

  17. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings as...

  18. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge. ...

  19. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The Presiding...

  20. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor, which...

  1. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions...

  2. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of law...

  3. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law and...

  4. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a proposed...

  5. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge. ...

  6. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and their...

  7. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may also...

  8. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may also...

  9. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a proposed...

  10. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 6 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with reasons...

  11. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the supporting...

  12. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge. ...

  13. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the supporting...

  14. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 2 2010-07-01 2010-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons...

  15. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... ORDERS Rules for Formal Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions...

  16. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of law...

  17. 31 CFR 10.75 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 10... and conclusions. Except in cases where the respondent has failed to answer the complaint or where a... submit proposed findings and conclusions and their supporting reasons to the Administrative Law Judge. ...

  18. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 6 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with reasons...

  19. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 6 2014-10-01 2014-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with reasons...

  20. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of law...

  1. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 6 2012-10-01 2012-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with reasons...

  2. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together with...

  3. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of law...

  4. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a proposed...

  5. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of law...

  6. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor, which...

  7. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and supporting...

  8. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may also...

  9. 24 CFR 1720.520 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Proposed findings, conclusions, and... PRACTICE Adjudicatory Proceedings Hearings § 1720.520 Proposed findings, conclusions, and order. The... which any party may file with the administrative law judge proposed findings of fact, conclusions of law...

  10. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of the...

  11. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law and...

  12. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The Presiding...

  13. 16 CFR 1025.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 16 Commercial Practices 2 2010-01-01 2010-01-01 false Proposed findings, conclusions, and order... PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 1025.46 Proposed findings, conclusions, and order. Within..., including proposed findings of fact and conclusions of law, as well as a proposed order. The Presiding...

  14. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may also...

  15. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the supporting...

  16. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor. ...

  17. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons...

  18. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false Proposed findings and conclusions. 901.48... Termination of Enrollment § 901.48 Proposed findings and conclusions. Except in cases where the respondent has... proposed findings and conclusions and supporting reasons therefor. ...

  19. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 1 2012-10-01 2012-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided, however...

  20. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a proposed...

  1. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Proposed findings, conclusions, and order. 672.19... FOUNDATION ENFORCEMENT AND HEARING PROCEDURES § 672.19 Proposed findings, conclusions, and order. Unless otherwise ordered by the Presiding Officer, any party may submit proposed findings of fact, conclusions of...

  2. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Conclusion of the SSC. 35.6820 Section... Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... (See § 35.6805(i)(4)). (b) After the administrative conclusion of the Superfund State Contract, EPA may...

  3. 17 CFR 10.82 - Proposed findings and conclusions; briefs.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... conclusions; briefs. 10.82 Section 10.82 Commodity and Securities Exchanges COMMODITY FUTURES TRADING... conclusions; briefs. In any proceeding involving a hearing or an opportunity for hearing, the parties may file written proposed findings of fact and conclusions of law. Briefs may be filed in support of proposed...

  4. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each..., conclusions of law, orders and supporting reasons either in oral or written form in the discretion of the...

  5. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 2 2013-07-01 2013-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor, which...

  6. 39 CFR 959.22 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 959.22 Section... RELATIVE TO THE PRIVATE EXPRESS STATUTES § 959.22 Proposed findings and conclusions. (a) Each party, except..., conclusions of law and supporting reasons either in oral or written form. The presiding officer may also...

  7. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... conclusions. 251.52 Section 251.52 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS... PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions. (a) Any party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda...

  8. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and their...

  9. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 952.23 Section... conclusions. (a) Each party to a proceeding, except one who fails to answer the complaint or, having answered... fact, conclusions of law, orders and supporting reasons either in oral or written form in the...

  10. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together with...

  11. 39 CFR 952.23 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Proposed findings and conclusions. 952.23 Section... RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.23 Proposed findings and conclusions. (a) Each... discretion of the presiding officer such is not appropriate, submit proposed findings of fact, conclusions of...

  12. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law and...

  13. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor, which...

  14. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 19 Customs Duties 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings as...

  15. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Proposed findings, conclusions, and order. 672.19... FOUNDATION ENFORCEMENT AND HEARING PROCEDURES § 672.19 Proposed findings, conclusions, and order. Unless otherwise ordered by the Presiding Officer, any party may submit proposed findings of fact, conclusions of...

  16. 47 CFR 1.263 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Proposed findings and conclusions. 1.263... Proceedings Hearing and Intermediate Decision § 1.263 Proposed findings and conclusions. (a) Each party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda of law: Provided, however...

  17. 16 CFR 3.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Proposed findings, conclusions, and order. 3... PRACTICE RULES OF PRACTICE FOR ADJUDICATIVE PROCEEDINGS Hearings § 3.46 Proposed findings, conclusions, and... Secretary for consideration of the Administrative Law Judge proposed findings of fact, conclusions of law...

  18. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the supporting...

  19. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and their...

  20. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law and...

  1. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and their...

  2. 29 CFR 458.87 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 2 2012-07-01 2012-07-01 false Proposed findings and conclusions. 458.87 Section 458.87... conclusions. Within fifteen (15) days following the close of the hearing, the parties may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons therefor, which...

  3. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed rule...

  4. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions of law, briefs and a...

  5. 39 CFR 957.20 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 957.20 Section... RELATIVE TO DEBARMENT AND SUSPENSION FROM CONTRACTING § 957.20 Proposed findings and conclusions. (a) Each... the Judicial Officer such is not appropriate, submit proposed findings of fact, conclusions of law and...

  6. 31 CFR 8.67 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 8... conclusions. Except in cases when the respondent has failed to answer the complaint or when a party has failed... afford the parties a reasonable opportunity to submit proposed findings and conclusions and their...

  7. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed rule...

  8. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Proposed findings and conclusions. 2.712 Section 2.712... Adjudications § 2.712 Proposed findings and conclusions. (a) Any party to a proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and conclusions of law, briefs and a...

  9. 37 CFR 251.52 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... conclusions. 251.52 Section 251.52 Patents, Trademarks, and Copyrights COPYRIGHT OFFICE, LIBRARY OF CONGRESS... PROCEDURE Procedures of Copyright Arbitration Royalty Panels § 251.52 Proposed findings and conclusions. (a) Any party to the proceeding may file proposed findings of fact and conclusions, briefs, or memoranda...

  10. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 2 2014-07-01 2014-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons...

  11. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and supporting...

  12. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and supporting...

  13. 29 CFR 417.12 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 2 2011-07-01 2011-07-01 false Proposed findings and conclusions. 417.12 Section 417.12... findings and conclusions. Within 10 days following the close of hearings, interested persons may submit proposed findings and conclusions to the Administrative Law Judge, together with supporting reasons...

  14. 40 CFR 22.26 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Proposed findings, conclusions, and.../TERMINATION OR SUSPENSION OF PERMITS Hearing Procedures § 22.26 Proposed findings, conclusions, and order. After the hearing, any party may file proposed findings of fact, conclusions of law, and a proposed...

  15. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 19 Customs Duties 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings as...

  16. 40 CFR 209.29 - Proposed findings, conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Proposed findings, conclusions. 209.29..., conclusions. (a) Within 20 days of the filing of the record with the hearing clerk as provided in § 209.28, or... consideration of the administrative law judge proposed findings of fact, conclusions of law, and a proposed rule...

  17. 39 CFR 3001.35 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 3001.35 Section... General Applicability § 3001.35 Proposed findings and conclusions. The Commission or the presiding officer may direct the filing of proposed findings and conclusions with a brief statement of the supporting...

  18. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together with...

  19. 49 CFR 511.46 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 6 2013-10-01 2013-10-01 false Proposed findings, conclusions, and order. 511.46... Proposed findings, conclusions, and order. Within a reasonable time after the closing of the record and..., including proposed findings of fact, conclusions of law and a proposed order, together with reasons...

  20. 31 CFR 15.737-24 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Proposed findings and conclusions. 15... conclusions. Except in cases where the respondent has failed to answer the complaint or where a party has... afford the parties a reasonable opportunity to submit proposed findings and conclusions and supporting...

  1. 29 CFR 2700.65 - Proposed findings, conclusions and orders.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Proposed findings, conclusions and orders. 2700.65 Section... COMMISSION PROCEDURAL RULES Hearings § 2700.65 Proposed findings, conclusions and orders. The Judge may require the submission of proposed findings of fact, conclusions of law, and orders, together with...

  2. 19 CFR 111.68 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 19 Customs Duties 1 2013-04-01 2013-04-01 false Proposed findings and conclusions. 111.68 Section... Monetary Penalty in Lieu of Suspension or Revocation § 111.68 Proposed findings and conclusions. The... record in which to submit proposed findings and conclusions and supporting reasons for the findings as...

  3. The Case Study of Off-Campus Postsecondary Education on Military Bases. Final Report. Summary, Conclusions, Recommendations.

    ERIC Educational Resources Information Center

    Allen, G. Jack; Andrews, Grover J.

    Results and recommendations of an in-depth study of education offered at 25 military installations are presented. Information is provided on study goals and the research design, and strengths/weaknesses of the study. A summary of site visitation findings is presented, along with conclusions concerning: institutional purpose and goals, organization…

  4. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  5. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  6. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  7. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  8. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  9. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  10. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  11. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  12. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  13. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  14. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  15. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  16. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  17. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  18. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  19. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  20. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  1. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2011-10-01 2011-10-01 false Radiotelephone installations. 183.392 Section...

  2. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section...

  3. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  4. Number of objectives and conclusions in dissertations and thesis.

    PubMed

    Liebano, Richard Eloin; Dias, Sandra Lopes; Ferreira, Lydia Masako

    2005-01-01

    To analyze the number of objectives and conclusions presented in dissertations and thesis defended at Federal University of São Paulo-Paulista School of Medicine (UNIFESP-EPM). It was realized a search in the master degree dissertations and doctor degree thesis defended at Federal University of São Paulo-Paulista School of Medicine in the years 2002 and 2003 that were found available in the central library of this university. From 723 master dissertations analyzed, 62 (8.57%) presented only one objective and one conclusion, 134 (18.53%) presented one objective and more than one conclusion and 527 (72.89%) had more than one objective and more than one conclusion. From 502 doctor thesis analyzed, 23 (4.58%) presented only one objective and one conclusion, 123 (24.50%) presented one objective and more than one conclusion and 376 (74.90%) had more than one objective and more than one conclusion. It wasn't found in researched literature the number of objectives and conclusions a scientific work must have. A highest number of thesis and dissertations presented more than one objective and more than one conclusion.

  5. Misleading abstract conclusions in randomized controlled trials in rheumatology: comparison of the abstract conclusions and the results section.

    PubMed

    Mathieu, Sylvain; Giraudeau, Bruno; Soubrier, Martin; Ravaud, Philippe

    2012-05-01

    Readers of scientific articles often read only the abstract and its conclusions because of lack of time or of access to the full-length articles. To assess the prevalence of misleading conclusions in abstracts of randomized controlled trials (RCTs) in rheumatology, determine whether trials are registered and whether abstract conclusions are based on the primary outcome (PO), and identify the predictors of misleading abstract conclusions. We searched Medline, Embase and the Cochrane Collaboration for reports of RCTs assessing rheumatoid arthritis, osteoarthritis or spondylarthropathies published between January 2006 and April 2008. Abstract conclusions were misleading if: the PO was not reported in the conclusion; the conclusions were based on only a secondary outcome or subgroup results; the results and conclusions were in disagreement; negative results were suggested as equivalent, or if there was no discussion of benefits and risks in cases of serious adverse events. Of the 144 reports selected, we focused on the 105 articles containing a clear PO. Twenty-four reports (23%) contained misleading conclusions. Lack of PO reporting (n=10) and conclusions disagreeing with article results (n=7) were the most frequent reasons. Nineteen out of 144 (13.2%) declared study registration with clear and similar registered and published POs and no misleading abstract conclusions. Reports of negative results showed a higher frequency of misleading conclusions as did those assessing osteoarthritis. On multivariable analysis, only negative results predicted misleading abstract conclusions (OR=9.58 [3.20-28.70]). Almost one-quarter of these RCT in rheumatology had misleading conclusions in the abstract, especially those with negative results. Copyright © 2011 Société française de rhumatologie. Published by Elsevier SAS. All rights reserved.

  6. Wind profiler installed in Antarctica

    NASA Astrophysics Data System (ADS)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  7. Installation of an offshore structure

    SciTech Connect

    Will, S.A.; Young, C.E.

    1981-04-07

    In the installation of a jacket or substructure component of an offshore platform on the sea floor over an underwater fixture containing one or more wellheads, a jacket is first ballasted to rest in a vertical orientation on the sea floor. Power winches are mounted atop the jacket above the water line and anchored mooring lines are connected to the winches via fairlead sheaves which define points of attachment for the mooring lines to the jacket. The jacket is deballasted to float with a near sea bottom clearance and is maneuvered horizontally with the power winches toward the underwater fixture. Docking guides carried by the jacket engage vertical guideposts driven drilled into the sea floor at preselected locations relative to the underwater fixture to align the jacket with the underwater fixture. The jacket is then lowered into the desired on-bottom position during controlled ballasting procedures. Finally, piles are driven through hollow jacket columns to anchor the jacket to the sea bottom.

  8. Device for installing rocket engines

    NASA Technical Reports Server (NTRS)

    George, T. R., Jr. (Inventor)

    1976-01-01

    A device for installing rocket engines is reported that is supported at a cant relative to vertical by an axially extensible, tiltable pedestal. A lifting platform supports the rocket engine at its thrust chamber exit, including a mount having a concentric base characterized by a concave bearing surface, a plurality of uniformly spaced legs extended radially from the base, and an annular receiver coaxially aligned with the base and affixed to the distal ends of said legs for receiving the thrust chamber exit. The lifting platform rests on a seat concentrically related to the pedestal and affixed to an extended end portion thereof having a convex bearing surface mated in sliding engagement with the concave bearing surface of the annular base for accommodating a rocking motion of the platform.

  9. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  10. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  11. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing. (a...

  12. Move Sequences in Graduate Research Paper Introductions and Conclusions

    ERIC Educational Resources Information Center

    Madrunio, Marilu Rañosa

    2012-01-01

    Graduate students submit academic papers at the end of the term as part of their coursework. Such papers contain introduction moves which may be troublesome and conclusion moves which may contain sub-moves not really required. This paper is aimed at assessing what particular moves are employed in the introduction and conclusion sections of 21…

  13. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing. (a...

  14. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing. (a...

  15. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing. (a...

  16. 40 CFR 209.35 - Conclusion of hearing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Conclusion of hearing. 209.35 Section 209.35 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) NOISE ABATEMENT PROGRAMS... Hearings for Orders Issued Under Section 11(d) of the Noise Control Act § 209.35 Conclusion of hearing. (a...

  17. On symbolic models for Single-Conclusion Logic of Proofs

    SciTech Connect

    Krupski, Vladimir N

    2011-05-31

    In this paper we define symbolic models for Single-Conclusion Logics of Proofs. We prove the soundness and completeness of these logics with respect to the corresponding classes of symbolic models. We apply the semantic methods developed in this paper to justify the use of terms of single-conclusion logic of proofs as notation for derivations in this logic. Bibliography: 17 titles.

  18. Jumping to the Right Conclusions, Inferences, and Predictions

    ERIC Educational Resources Information Center

    Giannattasio, Jack; Bazler, Judith

    2005-01-01

    Writing meaningful conclusions, drawing accurate inferences, and making relevant predictions are essential skills that many adolescents lack. The differences among conclusions, inferences, and predictions, although subtle, must be recognized to accurately analyze and interpret lab data. During one of the authors' 14 years as a physics and…

  19. Case Report: Silicatosis in a Carpet Installer

    PubMed Central

    Szeinuk, Jaime; Wilk-Rivard, Elizabeth J.

    2007-01-01

    Context Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. Case presentation We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Discussion Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Relevance to Clinical or Professional Practice Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung. PMID:17589602

  20. DoD Installation Energy Security

    DTIC Science & Technology

    2012-05-24

    Opportunities  New revenue streams ● DoD Drivers  Economics  Energy security Smart MicroGrids 3 Military Installations and Energy Markets...58.8 MW Military Installations Often Do Not Look Like Commercial Facilities 5 DoD and Microgrids ● Must include an interconnected set of loads...grid and the local utility market Primary goal of DoD installation microgrids is to provide energy security in a cost effective manner. 6

  1. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  2. Antispin-Tail-Parachute Installations

    NASA Technical Reports Server (NTRS)

    Seidman, Oscar; Kamm, Robert W.

    1943-01-01

    Although antispin tail parachutes have been used successfully in spin demonstrations for some time, very little published information is available concerning the size of parachute, the bridle-line length, and the type and location of pack to use for particular airplane. The present paper is an attempt to supply data relating to these factors. The paper is in two parts. The first part reviews the principles of operation of the antispin parachutes, views the principles of operation of the antispin parachutes, summarized available information on actual installations, and discusses parachute loads and pack locations. The second part of the paper reports on systematic tests in the NACA-15-foot and 20-foot free-spinning tunnels at the Langley memorial Aeronautical Laboratory to determine the minimum size and the optimum bridle-line lengths for antispin tail parachutes for current military airplanes. It is concluded that airplanes weighing between 7500 and 14,000 pounds require parachutes 8 feet in diameter and bridle-line lengths between 20 and 50 feet. A positive-ejection mechanism is desirable to throw the parachute clear of the tail and to assure rapid opening. The pack and attachment point must be so located that the equipment will not foul the tail surfaces.

  3. ALARA in European nuclear installations

    SciTech Connect

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  4. Conclusiveness of natural languages and recognition of images

    SciTech Connect

    Wojcik, Z.M.

    1983-01-01

    The conclusiveness is investigated using recognition processes and one-one correspondence between expressions of a natural language and graphs representing events. The graphs, as conceived in psycholinguistics, are obtained as a result of perception processes. It is possible to generate and process the graphs automatically, using computers and then to convert the resulting graphs into expressions of a natural language. Correctness and conclusiveness of the graphs and sentences are investigated using the fundamental condition for events representation processes. Some consequences of the conclusiveness are discussed, e.g. undecidability of arithmetic, human brain assymetry, correctness of statistical calculations and operations research. It is suggested that the group theory should be imposed on mathematical models of any real system. Proof of the fundamental condition is also presented. 14 references.

  5. Conclusion Chapters in Doctoral Theses: Some International Findings

    ERIC Educational Resources Information Center

    Trafford, Vernon; Leshem, Shosh; Bitzer, Eli

    2014-01-01

    This study investigated how candidates claimed to have made an original contribution to knowledge in the conclusion chapters of 100 PhD theses. Documentary analysis was used to discover how this was explained within theses at selected universities in three countries. No other documents were accessed and neither were candidates, supervisors or…

  6. Hypothesis, Prediction, and Conclusion: Using Nature of Science Terminology Correctly

    ERIC Educational Resources Information Center

    Eastwell, Peter

    2012-01-01

    This paper defines the terms "hypothesis," "prediction," and "conclusion" and shows how to use the terms correctly in scientific investigations in both the school and science education research contexts. The scientific method, or hypothetico-deductive (HD) approach, is described and it is argued that an understanding of the scientific method,…

  7. Overview of human health in the Arctic: conclusions and recommendations

    PubMed Central

    Donaldson, Shawn; Adlard, Bryan; Odland, Jon Øyvind

    2016-01-01

    This article is intended to provide an overview of the key conclusions, knowledge gaps and key recommendations based on the recent 2015 Arctic human health assessment under the Arctic Monitoring and Assessment Program. This assessment was based primarily on data from human health monitoring and research studies and peer-reviewed literature published since the last assessment in 2009. PMID:27974138

  8. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  9. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  10. 45 CFR 672.19 - Proposed findings, conclusions, and order.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Proposed findings, conclusions, and order. 672.19 Section 672.19 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE... law, and a proposed order, together with supporting briefs, within twenty (20) days after the...

  11. 20 CFR 901.48 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Proposed findings and conclusions. 901.48 Section 901.48 Employees' Benefits JOINT BOARD FOR THE ENROLLMENT OF ACTUARIES REGULATIONS GOVERNING THE PERFORMANCE OF ACTUARIAL SERVICES UNDER THE EMPLOYEE RETIREMENT INCOME SECURITY ACT OF 1974 Suspension...

  12. Hypothesis, Prediction, and Conclusion: Using Nature of Science Terminology Correctly

    ERIC Educational Resources Information Center

    Eastwell, Peter

    2012-01-01

    This paper defines the terms "hypothesis," "prediction," and "conclusion" and shows how to use the terms correctly in scientific investigations in both the school and science education research contexts. The scientific method, or hypothetico-deductive (HD) approach, is described and it is argued that an understanding of the scientific method,…

  13. 10 CFR 2.712 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Proposed findings and conclusions. 2.712 Section 2.712 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING PROCEEDINGS AND ISSUANCE OF... proceeding may, or if directed by the presiding officer shall, file proposed findings of fact and...

  14. General conclusions regarding the planetary-solar-terrestrial interaction

    NASA Astrophysics Data System (ADS)

    Mörner, N.-A.; Tattersall, R.; Solheim, J.-E.; Charvatova, I.; Scafetta, N.; Jelbring, H.; Wilson, I. R.; Salvador, R.; Willson, R. C.; Hejda, P.; Soon, W.; Velasco Herrera, V. M.; Humlum, O.; Archibald, D.; Yndestad, H.; Easterbrook, D.; Casey, J.; Gregori, G.; Henriksson, G.

    2013-12-01

    In a collection of research papers devoted to the problem of solar variability and its origin in planetary beat, it is demonstrated that the forcing function originates from gravitational and inertial effects on the Sun from the planets and their satellites. This conclusion is shared by nineteen co-authors.

  15. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  16. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  17. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  18. 40 CFR 35.6820 - Conclusion of the SSC.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... STATE AND LOCAL ASSISTANCE Cooperative Agreements and Superfund State Contracts for Superfund Response Actions Requirements for Administering A Superfund State Contract (ssc) § 35.6820 Conclusion of the SSC... all future operation and maintenance as required by CERCLA section 104(c) and addressed in 40 CFR...

  19. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  20. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  1. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  2. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  3. 22 CFR 18.18 - Proposed findings and conclusions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Proposed findings and conclusions. 18.18 Section 18.18 Foreign Relations DEPARTMENT OF STATE PERSONNEL REGULATIONS CONCERNING POST EMPLOYMENT CONFLICT OF INTEREST Administrative Enforcement Proceedings § 18.18 Proposed findings and...

  4. When Proofs Reflect More on Assumptions than Conclusions

    ERIC Educational Resources Information Center

    Dawkins, Paul Christian

    2014-01-01

    This paper demonstrates how questions of "provability" can help students engaged in reinvention of mathematical theory to understand the axiomatic game. While proof demonstrates how conclusions follow from assumptions, "provability" characterizes the dual relation that assumptions are "justified" when they afford…

  5. Summary of experimental releases of exotic microsporidia: conclusions and recommendations

    Treesearch

    J. V. Maddox; M. R. Jeffords; M. L. McManus; R. E. Webb

    1991-01-01

    During a 1985 European expedition, 5 species of microsporidia were obtained from gypsy moth collected in Portugal Czechoslovakia, and Bulgaria. From 1986-1989, we released all 5 species of these microsporidia into gypsy moth populations in isolated woodlots in Maryland. This presentation is a summary of the conclusions and recommendations based on the results of our...

  6. MISSION CONTROL CENTER (MCC) - CELEBRATION - CONCLUSION - APOLLO 11 MISSION - MSC

    NASA Image and Video Library

    1969-07-25

    S69-40023 (24 July 1969) --- Overall view of the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, Manned Spacecraft Center (MSC), showing the flight controllers celebrating the successful conclusion of the Apollo 11 lunar landing mission.

  7. Area V Vocational Education Planning Conclusions and Recommendations: Third Report.

    ERIC Educational Resources Information Center

    Area 5 Vocational Planning Committee, Pleasant Hill, CA.

    Conclusions and recommendations regarding the development of an Area Master Plan to provide maximum coordination between vocational, technical, adult, and continuing education agencies within Alameda and Contra Costa Counties, California, are presented. The Area Five Planning Committee, which developed the Master Plan, based its evaluation and…

  8. When Proofs Reflect More on Assumptions than Conclusions

    ERIC Educational Resources Information Center

    Dawkins, Paul Christian

    2014-01-01

    This paper demonstrates how questions of "provability" can help students engaged in reinvention of mathematical theory to understand the axiomatic game. While proof demonstrates how conclusions follow from assumptions, "provability" characterizes the dual relation that assumptions are "justified" when they afford…

  9. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  10. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  11. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  12. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  13. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  14. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  15. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  16. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  17. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  18. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  19. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  20. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  1. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  2. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  3. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  4. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... periodically. (f) The facility must have the following ground-air or landline communication services: (1) At... communications from the airport served by the facility. The utilization of voice on the SDF should be determined...

  5. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... supplemented by (depending on the circumstances) the following ground-air or landline communications services... ground-air communications from the airport served by the facility. Voice on the aid controlled from the...

  6. 14 CFR 171.9 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and the installation must meet at least the Federal Communication Commission's... following ground-air or landline communications services: (1) At facilities outside of and not immediately...

  7. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  8. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  9. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  10. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  11. Science Officer Whitson installs SUBSA in MSG

    NASA Image and Video Library

    2002-07-05

    ISS005-E-06787 (5 July 2002) --- Astronaut Peggy A. Whitson, Expedition Five flight engineer, works near the Microgravity Science Glovebox (MSG) in the Destiny laboratory on the International Space Station (ISS). Whitson spent much of the morning installing the Solidification Using a Baffle in Sealed Ampoules (SUBSA) experiment in the MSG. The SUBSA installation will be completed once the MSG is activated.

  12. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  13. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  14. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  15. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  16. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  17. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  18. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  19. Financial Institutions on DoD Installations

    DTIC Science & Technology

    1989-07-26

    Instructions 1000.10 and 1000.12 (references (b) and (c)). 5 4. Military disbursing offices, nonappropriated fund instrumentalities , and other DoD installation...offices, Agencies, and Departments performing functions on a DoD installation (including nonappropriated fund instrumentalities ); and their

  20. MSFC inspections of installed polyimide wire

    NASA Technical Reports Server (NTRS)

    Landers, Joe C.

    1994-01-01

    An alert was issued because of the arc-tracking possibilities of installed polyimide wire harnesses. MSFC undertook a program to try to enhance the safety and reliability of these harnesses. Photographs are presented showing the need for inspections of installed wiring harnesses.

  1. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  2. Noise control at washery plants and installations

    SciTech Connect

    Fore, J.; Santamaria, J.

    1980-01-01

    In the last few years a series of acoustic investigations has been conducted at washery plants and installations. Experiments have shown that the noise level in a number of work areas significantly exceeds 90 dB and reaches 100 dB and over in work areas, for example on such equipment as screens. Prolonged work under high noise conditions may result in the appearance of occupational deafness in the operating personnel; the noise practically prevents any communication, simultaneously increasing the hazard and degrading the quality of the work. Conclusions from the studies were: (1) The classifiers and all drops and chutes are a source of severe noise at washeries. (2) Obvious acoustic insulation materials are rubber or plastics, used in place of metal elements or as a coating for them. (3) Solving the problem of selection of these materials depends on consideration of various factors: the characteristics of the products being processed, the heights and angles of drops, the type of classifier, the accuracy of separation and the output of the screening surfaces. (4) The acoustic adsorption characteristics of large buildings not divided by walls, such as modern washeries, are so high that there is no necessity for any acoustic modification of these buildings.

  3. Jumping to conclusions in untreated patients with Parkinson's disease

    PubMed Central

    de Rezende Costa, Flavio Henrique; Averbeck, Bruno; O'Sullivan, Sean S.; Vincent, Maurice Borges; Rosso, Ana Lucia; Lees, Andrew J.; Djamshidian, Atbin

    2016-01-01

    Background Jumping to conclusions due to impulsivity has been shown to be a sensitive marker for dopamine dysregulation and addictive behaviour patterns in treated patients with Parkinson's disease (PD). It is unknown whether drug naïve PD patients, who have never received dopaminergic therapy also have deficits in information sampling. Methods Twenty five de novo PD patients and twenty matched healthy controls were recruited and tested on the beads task, which is a validated information sampling task to assess reflection impulsivity and a temporal discounting questionnaire. Results Patients gathered significantly less information and made more irrational choices than matched controls. There was, however, no group difference on the temporal discounting questionnaire. Conclusions Poor information sampling and irrational decision making may be an inherent component of the neuropsychological deficit in Parkinson's disease. These findings suggest that underlying impulsivity detected by a metric task is common in de novo PD. PMID:26956927

  4. Epilogue: Conclusions and Implications for Research and Practice

    PubMed Central

    Moeller, Mary Pat; Tomblin, J. Bruce

    2015-01-01

    The primary purpose of the epilogue article is to synthesize the key findings from the Outcomes of Children with Hearing Loss (OCHL) study by presenting a set of ten major conclusions. The conclusion statements provide a concise summary of the main results related to children’s auditory and language outcomes and factors identified as moderators of these outcomes. The second section of this article summarizes the primary clinical implications that follow from the OCHL study in relation to three questions: 1) Can we afford to be complacent about the current outcomes of children who are hard of hearing? 2) What malleable factors can be addressed to promote success through implementation of best practices? and 3) What non-malleable factors are consequential and what are their implications for practice? We end with some future research directions for the OCHL project. PMID:26731162

  5. [Problems of occupational fitness conclusion on periodic medical examination].

    PubMed

    Alekseev, V B; Vlasova, E M; Nosov, A E; Ponomareva, T A; Kostarev, V G

    2014-01-01

    Additional examination in Occupational Pathology Center are economic loss both for employer and employee, as the employee receives payment for those days when in the examination. Analysis of over 600 cases of occupational fitness examination in Occupational Pathology Center according to referrals given by medical institutions providing periodic medical examination shows that in most cases the conclusion was possible during periodic medical examination. Difficulties in conclusion on workers' fitness for occupation during periodic medical examination, according to our viewpoint, result not from limited diagnostic facilities for adequate examination and unfitness disclosure, but from lack of information in primary medical documentation and inadequacy of occupational factor and work characteristics presented by employer to actual working conditions.

  6. Mission Control Center (MCC) - Celebration - Conclusion - Apollo XI Mission - MSC

    NASA Image and Video Library

    1969-07-24

    S69-40301 (24 July 1969) --- Overall view of the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), Building 30, Manned Spacecraft Center (MSC), at the conclusion of the Apollo 11 lunar landing mission. The television monitor shows President Richard M. Nixon greeting the Apollo 11 astronauts aboard the USS Hornet in the Pacific recovery area. Astronauts Neil A. Armstrong, Michael Collins, and Edwin E. Aldrin Jr. are inside the Mobile Quarantine Facility (MQF).

  7. Statistical Conclusion Validity: Some Common Threats and Simple Remedies

    PubMed Central

    García-Pérez, Miguel A.

    2012-01-01

    The ultimate goal of research is to produce dependable knowledge or to provide the evidence that may guide practical decisions. Statistical conclusion validity (SCV) holds when the conclusions of a research study are founded on an adequate analysis of the data, generally meaning that adequate statistical methods are used whose small-sample behavior is accurate, besides being logically capable of providing an answer to the research question. Compared to the three other traditional aspects of research validity (external validity, internal validity, and construct validity), interest in SCV has recently grown on evidence that inadequate data analyses are sometimes carried out which yield conclusions that a proper analysis of the data would not have supported. This paper discusses evidence of three common threats to SCV that arise from widespread recommendations or practices in data analysis, namely, the use of repeated testing and optional stopping without control of Type-I error rates, the recommendation to check the assumptions of statistical tests, and the use of regression whenever a bivariate relation or the equivalence between two variables is studied. For each of these threats, examples are presented and alternative practices that safeguard SCV are discussed. Educational and editorial changes that may improve the SCV of published research are also discussed. PMID:22952465

  8. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    DTIC Science & Technology

    2015-09-01

    FINAL REPORT Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed ESTCP Project EW...ERDC-CERL, a definition of a “net zero energy installation” was proposed based on current realities at Army installations: The amount of fossil

  9. Conclusions from the Image Analysis of the VSOP Survey

    NASA Astrophysics Data System (ADS)

    Dodson, R.; Fomalont, E.; Wiik, K.

    2009-08-01

    In February 1997, the Japanese radio astronomy satellite HALCA was launched to provide the space-bourne element for the VLBI Space Observatory Programme (VSOP) mission. A significant fraction of the mission time was to be dedicated to the VSOP Survey of bright compact Active Galactic Nuclei (AGN) at 5 GHz, which was lead by ISAS. The VSOP Survey Sources are an unbiased dataset of 294 targets, of which 82% were successfully observed. These are now undergoing statistical analysis to tease out the characteristics of typical AGN sources. We present here the summary of the imaging and conclusions we have reached.

  10. The Evidence and Conclusion Ontology (ECO): Supporting GO Annotations.

    PubMed

    Chibucos, Marcus C; Siegele, Deborah A; Hu, James C; Giglio, Michelle

    2017-01-01

    The Evidence and Conclusion Ontology (ECO) is a community resource for describing the various types of evidence that are generated during the course of a scientific study and which are typically used to support assertions made by researchers. ECO describes multiple evidence types, including evidence resulting from experimental (i.e., wet lab) techniques, evidence arising from computational methods, statements made by authors (whether or not supported by evidence), and inferences drawn by researchers curating the literature. In addition to summarizing the evidence that supports a particular assertion, ECO also offers a means to document whether a computer or a human performed the process of making the annotation. Incorporating ECO into an annotation system makes it possible to leverage the structure of the ontology such that associated data can be grouped hierarchically, users can select data associated with particular evidence types, and quality control pipelines can be optimized. Today, over 30 resources, including the Gene Ontology, use the Evidence and Conclusion Ontology to represent both evidence and how annotations are made.

  11. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  12. Vehicle Support Posts Installation at Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  13. Debarment: A Guide for Installation Commanders

    DTIC Science & Technology

    2001-04-01

    U.S. v. May, et. al., 622 F.2d 1000 (1980), for the proposition that commanders —bar“ individuals from base, but see, Flower v. United States, 407 U.S...installations by order of the installation commander. In Flower v. United States,30 the Supreme Court began to clarify it‘s holding in McElroy, and...articulate the parameters within which an installation commander can operate in protecting assets and people under his command. In Flower , the Supreme

  14. Equipment qualification risk scoping analyses: Results and conclusions

    SciTech Connect

    Bustard, L.D.; Kolaczkowski, A.M.

    1989-01-01

    Probabilistic risk assessment (PRA) techniques and insights have been employed during an investigation entitled the Equipment Qualification (EQ)-Risk Scoping Study to assess the risk significance of equipment qualification issues. This approach for evaluating EQ issues suggests that some issues are not risk significant while some have a significant potential to increase risk. For example, EQ issues associated with long term accident equipment operability are not risk significant. Alternatively, there are selected system operations that require equipment not qualified for important accident environments. Though the study demonstrated that PRA does provide insights that modify perceptions regarding the importance of various EQ issues, it should be noted that PRA methods currently cannot define the risk significance for some EQ issues. Additional discussion regarding the study's results and conclusions is provided. 6 refs.

  15. Conclusive quantum steering with superconducting transition-edge sensors

    PubMed Central

    Smith, Devin H.; Gillett, Geoff; de Almeida, Marcelo P.; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gerrits, Thomas; Wiseman, Howard M.; Nam, Sae Woo; White, Andrew G.

    2012-01-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date, all experimental tests with single-photon states have relied on post selection, allowing untrusted devices to cheat by hiding unfavourable events in losses. Here we close this 'detection loophole' by combining a highly efficient source of entangled photon pairs with superconducting transition-edge sensors. We achieve an unprecedented ∼62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 s.d.s. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test. PMID:22233635

  16. Conclusive quantum steering with superconducting transition-edge sensors

    NASA Astrophysics Data System (ADS)

    Smith, Devin H.; Gillett, Geoff; de Almeida, Marcelo P.; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gerrits, Thomas; Wiseman, Howard M.; Nam, Sae Woo; White, Andrew G.

    2012-01-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date, all experimental tests with single-photon states have relied on post selection, allowing untrusted devices to cheat by hiding unfavourable events in losses. Here we close this 'detection loophole' by combining a highly efficient source of entangled photon pairs with superconducting transition-edge sensors. We achieve an unprecedented ~62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 s.d.s. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  17. Conclusive quantum steering with superconducting transition edge sensors

    NASA Astrophysics Data System (ADS)

    de Almeida, Marcelo P.; Smith, Devin H.; Gillett, Geo; Branciard, Cyril; Fedrizzi, Alessandro; Weinhold, Till J.; Lita, Adriana; Calkins, Brice; Gertis, Thomas; Nam, Sae Woo; White, Andrew G.

    2012-02-01

    Quantum steering allows two parties to verify shared entanglement even if one measurement device is untrusted. A conclusive demonstration of steering through the violation of a steering inequality is of considerable fundamental interest and opens up applications in quantum communication. To date all experimental tests with single photon states have relied on post-selection, allowing untrusted devices to cheat by hiding unfavorable events in losses. Here we close this ``detection loophole'' by combining a highly efficient source of entangled photon pairs with superconducting transition edge sensors. We achieve an unprecedented ˜62% conditional detection efficiency of entangled photons and violate a steering inequality with the minimal number of measurement settings by 48 standard deviations. Our results provide a clear path to practical applications of steering and to a photonic loophole-free Bell test.

  18. The no conclusion intervention for couples in conflict.

    PubMed

    Migerode, Lieven

    2014-07-01

    Dealing with difference is central to all couple therapy. This article presents an intervention designed to assist couples in handling conflict. Central to this approach is the acceptance that most conflicts cannot be solved. Couples are in need of a different understanding of couples conflict. This understanding is found in the analysis of love in context and in relational dialectics. Couples are guided through different steps: deciding on the valence of the issue as individuals, helping them decide which differences can be resolved and which issues demand new ways of living with the inevitable, and the introduction in the suggested no conclusion dialogue. This article briefly describes the five day intensive couple therapy program, in which the no intervention is embedded. The theoretical foundation of the intervention, followed by the step by step description of the intervention forms the major part of the article. A case vignette illustrates this approach. © 2012 American Association for Marriage and Family Therapy.

  19. MISSION CONTROL CENTER (MCC) VIEW - CONCLUSION APOLLO 11 CELEBRATION - MSC

    NASA Image and Video Library

    1969-07-24

    S69-40024 (24 July 1969) --- NASA and Manned Spacecraft Center (MSC) officials join in with the flight controllers, in the Mission Operations Control Room (MOCR) in the Mission Control Center (MCC), in celebrating the successful conclusion of the Apollo 11 lunar landing mission. Identifiable in the picture, starting in foreground, are Dr. Robert R. Gilruth, MSC Director; George M. Low, Manager, Apollo Spacecraft Program, MSC; Dr. Christopher C. Kraft Jr., MSC Director of Flight Operation; U.S. Air Force Lt. Gen. Samuel C. Phillips (with glasses, looking downward), Apollo Program Director, Office of Manned Space Flight, NASA Headquarters; and Dr. George E. Mueller (with glasses, looking toward left), Associate Administrator, Office of Manned Space Flight, NASA Headquarters. Former astronaut John H. Glenn Jr. is standing behind Mr. Low.

  20. Evidence-based therapy relationships: research conclusions and clinical practices.

    PubMed

    Norcross, John C; Wampold, Bruce E

    2011-03-01

    In this closing article of the special issue, we present the conclusions and recommendations of the interdivisional task force on evidence-based therapy relationships. The work was based on a series of meta-analyses conducted on the effectiveness of various relationship elements and methods of treatment adaptation. A panel of experts concluded that several relationship elements were demonstrably effective (alliance in individual psychotherapy, alliance in youth psychotherapy, alliance in family therapy, cohesion in group therapy, empathy, collecting client feedback) while others were probably effective (goal consensus, collaboration, positive regard). Three other relationship elements (congruence/genuineness, repairing alliance ruptures, and managing countertransference) were deemed promising but had insufficient evidence to conclude that they were effective. Multiple recommendations for practice, training, research, and policy are advanced. (PsycINFO Database Record (c) 2011 APA, all rights reserved).

  1. Parenteral trace element provision: recent clinical research and practical conclusions

    PubMed Central

    Stehle, P; Stoffel-Wagner, B; Kuhn, K S

    2016-01-01

    The aim of this systematic review (PubMed, www.ncbi.nlm.nih.gov/pubmed and Cochrane, www.cochrane.org; last entry 31 December 2014) was to present data from recent clinical studies investigating parenteral trace element provision in adult patients and to draw conclusions for clinical practice. Important physiological functions in human metabolism are known for nine trace elements: selenium, zinc, copper, manganese, chromium, iron, molybdenum, iodine and fluoride. Lack of, or an insufficient supply of, these trace elements in nutrition therapy over a prolonged period is associated with trace element deprivation, which may lead to a deterioration of existing clinical symptoms and/or the development of characteristic malnutrition syndromes. Therefore, all parenteral nutrition prescriptions should include a daily dose of trace elements. To avoid trace element deprivation or imbalances, physiological doses are recommended. PMID:27049031

  2. Differences between evolution of Titan's and Earth's rivers - further conclusions

    NASA Astrophysics Data System (ADS)

    Misiura, Katarzyna; Czechowski, Leszek

    2014-05-01

    Titan is the only celestial body, beside the Earth, where liquid is present on the surface. Liquid forms a number of lakes and rivers. In our research we use numerical model of the river to determine differences of evolution of rivers on the Earth and on Titan. We have found that transport of sediments on Titan is more effective than on Earth for the same river geometry and discharge. We have found also the theoretical explanations for this conclusion. 2.Introduction Titan is a very special body in the Solar System. It is the only moon that has dense atmosphere and flowing liquid on its surface. The Cassini-Huygens mission has found on Titan meandering rivers, and indicated processes of erosion, transport of solid material and its sedimentation. This paper is aimed to investigate the similarity and differences between these processes on Titan and the Earth. 3. Basic equations of our model The dynamical analysis of the considered rivers is performed using the package CCHE modified for the specific conditions on Titan. The package is based on the Navier-Stokes equations for depth-integrated two dimensional, turbulent flow and three dimensional convection-diffusion equation of sediment transport. 4. Parameters of the model We considered our model for a few kinds of liquid found on Titan. The liquid that falls as a rain (75% methane, 25% nitrogen) has different properties than the fluid forming lakes (74% ethane, 10% methane, 7% propane, 8.5% butane, 0.5% nitrogen). Other parameters of our model are: inflow discharge, outflow level, grain size of sediments etc. For every calculation performed for Titan's river similar calculations are performed for terrestrial ones. 5. Results and Conclusions The results of our simulation show the differences in behaviour of the flow and of sedimentation on Titan and on the Earth. Our preliminary results indicate that transport of material by Titan's rivers is more efficient than by terrestrial rivers of the same geometry parameters

  3. FORCAST Camera Installed on SOFIA Telescope

    NASA Image and Video Library

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  4. Plazmennyi-Kristall-3 plus hardware installation

    NASA Image and Video Library

    2010-06-30

    ISS024-E-007108 (30 June 2010) --- Russian cosmonaut Alexander Skvortsov, Expedition 24 commander, installs hardware for the new Plasma Crystal-3 Plus experiment in the Poisk Mini-Research Module 2 (MRM2) of the International Space Station.

  5. Space Station Live: Installing the AMS

    NASA Image and Video Library

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  6. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  7. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  8. Concentrating solar collector-installation package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Report contains general description of concentrating solar collector and tracking system kit, along with comprehensive drawings, instructions, and guidelines to assist in field assembly, installation, operation, and maintenance of system.

  9. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., unless the CFO determines that a longer period is required. Installment payments of less than $50 per... interest of the United States, paying special attention to applicable statutes of limitations....

  10. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... determines that a longer period is required. Installment payments of less than $50 per month generally will... accordance with the best interest of the United States, paying special attention to applicable statutes...

  11. Preparing to Install APXS Sensor Head

    NASA Image and Video Library

    2009-10-13

    Grad student Nicholas Boyd left and Principal Investigator Ralf Gellert, both of the University of Guelph, Ontario, Canada, prepare for the installation of the Alpha Particle X-ray Spectrometer sensor head during testing at NASA JPL.

  12. AERODYNAMICS OF POWER PLANT INSTALLATION, PART II.

    DTIC Science & Technology

    schemes on V/STOL aircraft at forward speeds; Lift-fan V/STOL propulsion and airframe integration; NASA research on the aerodynamics of jet VTOL engine installations; Experimental studies of VTOL fan-in-wing inlets.

  13. EPA RE-Powering Mapper Completed Installations

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.

  14. Hydrogen isotope separation installation for tritium facility

    SciTech Connect

    Andreev, B.M.; Perevezentsev, A.N.; Selivanenko, I.L.; Tenyaev, B.N.; Vedeneev, A.I.; Golubkov, A.N.

    1995-10-01

    The separation of hydrogen isotopes in the hydrogen-palladium system in sectioned separation columns with the simulation of counter-current isotopic exchange is described. The separation efficiency of sectioned columns is investigated with the experimental installation as a function of various parameters. The separation of deuterium-tritium mixtures with high tritium concentrations is tested with the pilot installation operating at room temperature and atmospheric hydrogen pressure. Due to very high separation efficiency, flexibility and simplicity of operation separation installations with sectioned columns are ideally suitable for tritium laboratories and facilities dealing with separation of hydrogen isotopes. Estimation of applicability of sectioned columns for regeneration of exhaust gas in a fuel cycle of thermonuclear reactors, such as JET and ITER, shows the number of advantages of separation installations with sectioned columns. 12 refs., 3 figs., 2 tabs.

  15. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  16. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  17. Installing SAM Instrument into Curiosity Mars Rover

    NASA Image and Video Library

    2011-01-18

    In this photograph, technicians and engineers inside a clean room at NASA Jet Propulsion Laboratory, Pasadena, Calif., position NASA Sample Analysis at Mars SAM above the mission Mars rover, Curiosity, for installing the instrument.

  18. The sandflat habitat: Scaling from experiments to conclusions

    USGS Publications Warehouse

    Thrush, S.F.; Pridmore, R.D.; Bell, R.G.; Cummings, V.J.; Dayton, P.K.; Ford, R.; Grant, J.; Green, M.O.; Hewitt, J.E.; Hines, A.H.; Hume, T.M.; Lawrie, S.M.; Legendre, P.; McArdle, B.H.; Morrisey, D.; Schneider, Davod C.; Turner, S.J.; Walters, R.A.; Whitlatch, R.B.; Wilkinson, M.R.

    1997-01-01

    Ecological systems are characterised by spatial and temporal variations in the density of organisms and resources, and in the intensity of processes which affect them (e.g. Watt, 1947, Dayton, 1971, Addicot et al., 1987, Kolasa and Pickett, 1991 and Giller et al., 1994). This heterogeneity represents both a difficulty for field study design and statistical testing, and a challenge to describe the spatial structuring of populations, communities and ecosystems (Legendre, 1993). Patterns in ecological and environmental variables are fundamental to developing hypotheses and in designing subsequent field studies, because they determine the spatial and temporal scales of study. Spatial and/or temporal patterns also provide useful stepping stones for addressing issues of scale. Patterns apparent at one scale can collapse to noise when viewed from other scales, indicating that patterns, processes and our perceptions vary in a scale-dependent manner. Perhaps the most important but rarely discussed issue is the question of how to scale-up from small-scale surveys and experiments to conclusions relevant at larger spatial and temporal scales.

  19. Effects of medical interventions on suicidal behavior. Summary and conclusions.

    PubMed

    Baldessarini, R J; Jamison, K R

    1999-01-01

    An international symposium evaluated current knowledge of the epidemiology, psychobiology, and effects of medical treatment on suicidal behavior. Moderators summarized the main findings and conclusions of the participants on the basis of presentations and consensus statements at the meeting. Despite striking advances in the medical treatment of mood disorders in the past half-century, rates of suicidal acts have changed little in the general population. Evidence of reduction of long-term rates of suicidal acts in specific at-risk populations remains very limited, particularly persons with major affective illnesses and other common, primary or comorbid psychiatric and substance use disorders. It is plausible that reduction of psychiatric morbidity should limit suicidal risk, but very little is known about specific effects of most psychiatric treatments or other interventions aimed at suicide prevention. An exception is substantial evidence of lower suicidal risk during long-term lithium treatment that was not equaled with carbamazepine. However, diagnosis and timely therapeutic interventions reach only a minority of psychiatrically ill persons at risk for suicide. Renewed efforts are strongly urged to: (1) improve public and professional awareness of risk factors for suicide, (2) enhance earlier access to appropriate clinical assessment and increasingly safe and effective treatments for affective and psychotic disorders, and (3) encourage and support research to clarify specific benefits and risks of medical treatments and social interventions aimed at preventing suicide.

  20. Employee counseling services evaluation system: design, issues and conclusions.

    PubMed

    Masi, D A; Teems, L A

    1983-01-01

    Employee Counseling Services (ECS) programs have emerged as an effective method for dealing with employees whose job performance has deteriorated due to personal problems such as alcoholism or drug abuse. It is estimated that 18% of any work force is effected by such problems at any given time and that these employees cost industry billions of dollars annually in lost productivity, abuse of sick leave, etc. One of the critical concerns of this emerging field is the need for comprehensive evaluation that can demonstrate the cost-effectiveness and cost-benefits of ECS programs. This paper will describe the model Federal ECS developed at the U.S. Department of Health and Human Services as well as the components of the evaluation system designed to determine its effectiveness. The system is the first of its kind and will be a valuable contribution to the field. The paper then raises issues and develops conclusions about designing such an evaluation within the context of a large bureaucracy.

  1. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  2. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  3. Cathodic protection installation for underground storage tanks

    SciTech Connect

    Koszewski, L.

    1995-12-31

    The 1998 deadline is fast approaching for upgrading Underground Storage Tanks (USTs) with cathodic protection. With so many tanks requiring upgrades over the next few years, tank owners and operators will likely find a shrinking pool of quality cathodic protection installation contractors to perform the necessary upgrading. The proper installation of cathodic protection components is critical to long term effective operation of the cathodic protection system.

  4. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  5. Extending Installation Sustainability Beyond the Fenceline

    DTIC Science & Technology

    2010-06-01

    Office of the Assistant Secretary of the Army (Installations and Environment) DoD Executive Agent Extending Installation Sustainability Beyond...Technology Transition – Supporting DoD Readiness, Sustainability , and the Warfighter Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010

  6. Water Sustainability Assessment for Ten Army Installations

    DTIC Science & Technology

    2011-03-26

    Limiting water conservation to the requirements of EO 13514 encou- rages installations to reach for the low hanging fruit . Technologies that have...ER D C/ CE RL T R- 11 -5 Water Sustainability Assessment for Ten Army Installations Co ns tr uc tio n En gi ne er in g R es...March 2011 Approved for public release; distribution is unlimited. ERDC/CERL TR-11-5 March 2011 Water Sustainability Assessment

  7. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  8. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  9. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Installation and details. 32.45-1 Section...

  10. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2011-10-01 2011-10-01 false Installation and details. 32.45-1 Section...

  11. A novel design procedure for jacket installations

    SciTech Connect

    Christiansen, P.E.; Sterndorff, M.J.

    1995-12-31

    In the summer of 1994 the jacket and topsides for Total Oil Marine`s Dunbar field in the UK sector of the North Sea were successfully installed by Heeremac`s heavy lift barge DB102. The jacket was lifted off the transportation barge, upended from horizontal to vertical using a crane assisted ballasting procedure, and then installed in two steps over four pre-installed under-leg piles. The installation of the jacket was challenging since the life was utilizing the full crane capacity and also due to the soil conditions at the location, which made the docking procedure critical to achieve the required installation tolerances for tie-back of the pre-drilled wells. The SSCV assisted installation procedure was carefully deigned and analyzed by numerical calculations supplemented and supported by extensive physical model testing. This paper addresses the model test methodology with emphasis on the innovative procedures for testing and analyzing random, non-linear phenomena: impact loads during jacket lift-off from the barge and between jacket and piles during docking. The test program and the analysis demonstrated the importance of providing not just a single value but a sample of extreme values for a proper assessment of design loads that are generated by non-linear random processes. Whereas the results from the tests are specific for the jacket structure, the methodology is of general use for the industry.

  12. Collaborative Automation Reliably Remediating Erroneous Conclusion Threats (CARRECT)

    PubMed Central

    Lansey, Jonathan C.; Picciano, Paul; Yohai, Ian; Grant, Fred; Gern, Robert

    2013-01-01

    Objective The objective of the CARRECT software is to make cutting edge statistical methods for reducing bias in epidemiological studies easy to use and useful for both novice and expert users. Introduction Analyses produced by epidemiologists and public health practitioners are susceptible to bias from a number of sources including missing data, confounding variables, and statistical model selection. It often requires a great deal of expertise to understand and apply the multitude of tests, corrections, and selection rules, and these tasks can be time-consuming and burdensome. To address this challenge, Aptima began development of CARRECT, the Collaborative Automation Reliably Remediating Erroneous Conclusion Threats system. When complete, CARRECT will provide an expert system that can be embedded in an analyst’s workflow. CARRECT will support statistical bias reduction and improved analyses and decision making by engaging the user in a collaborative process in which the technology is transparent to the analyst. Methods Older approaches to imputing missing data, including mean imputation and single imputation regression methods, have steadily given way to a class of methods known as “multiple imputation” (hereafter “MI”; Rubin 1987). Rather than making the restrictive assumption that the data are missing completely at random (MCAR), MI typically assumes the data are missing at random (MAR). There are two key innovations behind MI. First, the observed values can be useful in predicting the missing cells, and thus specifying a joint distribution of the data is the first step in implementing the models. Second, single imputation methods will likely fail not only because of the inherent uncertainty in the missing values but also because of the estimation uncertainty associated with generating the parameters in the imputation procedure itself. By contrast, drawing the missing values multiple times, thereby generating m complete datasets along with the

  13. Spectroscopy of asteroid pairs - new observations support previous conclusions

    NASA Astrophysics Data System (ADS)

    Polishook, David; Oszkiewicz, Dagmara Anna; None Kwiatkowski, Tomasz

    2015-08-01

    Asteroid pairs were split due to fast rotation of a strengthless body. Study them can reveal fundamental principles in asteroid interiors and evolution. We continue our spectroscopic survey of asteroid pairs in the near-IR range (IRTF) and work on completing the spectral coverage in the visible wavelength (SALT, NOT).Our new observations support our previous conclusions (Polishook et al. 2014):1. Primary and secondary members have very similar reflectance spectra supporting the claim that every pair originated from a single progenitor. We measured 2 more pairs that present the same taxonomy (4905-7813, 15107-291188). This increases to 22 the number of asteroid pairs with spectral similarities and supports the claim of a single progenitor for each pair to a significance of over 5 sigma.2. Rotational fission is not a function of the asteroid composition rather the asteroid’s structure. We present new reflectance spectra of S- and C-complex pairs that differ in their composition.3. Some asteroid pairs present spectral parameters that imply a fresh, non-weathered surface. This includes spectral slope, and a deep and wide absorption band at 1 micron. Among these, the asteroid 8306 can now be re-classified as a Q-type asteroid, a common class in the near-Earth environment, but rare in the main belt. 8306 is the 4th Q-type discovered within asteroid pairs (all locate in the main belt).4. A secondary member of an asteroid pair composed of ordinary chondrite (S-complex) might present a reflectance spectrum with lower spectral slope compared to its primary member. This is seen in the new measured reflectance spectrum of secondary 291188). This result supports the theory of Jacobson & Scheeres (2011) of continuous disintegration of the secondaries while still in the vicinity of their primaries.5. With time, the fresh surface becomes weathered. Dynamical calculations limit the disintegration time of the progenitor of the pair 4905-7813 to 1.65 millions years ago, what makes

  14. The European Food Consumption Validation Project: conclusions and recommendations.

    PubMed

    de Boer, E J; Slimani, N; van 't Veer, P; Boeing, H; Feinberg, M; Leclercq, C; Trolle, E; Amiano, P; Andersen, L F; Freisling, H; Geelen, A; Harttig, U; Huybrechts, I; Kaic-Rak, A; Lafay, L; Lillegaard, I T; Ruprich, J; de Vries, J H; Ocké, M C

    2011-07-01

    To outline and discuss the main results and conclusions of the European Food Consumption Validation (EFCOVAL) Project. The EFCOVAL Project was carried out within the EU Sixth Framework Program by researchers in 11 EU countries. The activities focused on (1) the further development of the EPIC-Soft software (the software developed to conduct 24-h dietary recalls (24-HDRs) in the European Prospective Investigation into Cancer and Nutrition (EPIC) Study) and the validation of the 2-day non-consecutive 24-HDR method using EPIC-Soft, (2) defining and investigating the applicability of the most appropriate dietary assessment method to younger age groups and expanding the applicability of the software for use in exposure assessment of some potentially hazardous chemicals and (3) to improve the methodology and statistical methods that estimate usual intake distributions from short-term dietary intake information and develop a methodology to quantify uncertainty in usual intake distributions. The preexisting EPIC-Soft application was reprogrammed into a Windows environment and more than 60 new specifications were implemented in the software. A validation study showed that two non-consecutive EPIC-Soft 24-HDRs are suitable to estimate the usual intake distributions of protein and potassium of European adult populations. The 2-day non-consecutive 24-HDRs in combination with a food propensity questionnaire also appeared to be appropriate to rank individuals according to their fish and fruit and vegetable intake in a comparable way in five European centers. Dietary intake of (young) children can be assessed by the combination of EPIC-Soft 24-HDRs and food recording booklets. The EPIC-Soft-standardized method of describing foods is useful to estimate dietary exposure to potentially hazardous chemicals such as specific flavoring substances. With the developed Multiple Source Method, repeated non-consecutive 24-HDR data in combination with food propensity data can be used to

  15. Cosmological Gamma-Ray Bursts and Hypernovae Conclusively Linked

    NASA Astrophysics Data System (ADS)

    2003-06-01

    Clearest-Ever Evidence from VLT Spectra of Powerful Event Summary A very bright burst of gamma-rays was observed on March 29, 2003 by NASA's High Energy Transient Explorer (HETE-II) , in a sky region within the constellation Leo. Within 90 min, a new, very bright light source (the "optical afterglow") was detected in the same direction by means of a 40-inch telescope at the Siding Spring Observatory (Australia) and also in Japan. The gamma-ray burst was designated GRB 030329 , according to the date. And within 24 hours, a first, very detailed spectrum of this new object was obtained by the UVES high-dispersion spectrograph on the 8.2-m VLT KUEYEN telescope at the ESO Paranal Observatory (Chile). It allowed to determine the distance as about 2,650 million light-years (redshift 0.1685). Continued observations with the FORS1 and FORS2 multi-mode instruments on the VLT during the following month allowed an international team of astronomers [1] to document in unprecedented detail the changes in the spectrum of the optical afterglow of this gamma-ray burst . Their detailed report appears in the June 19 issue of the research journal "Nature". The spectra show the gradual and clear emergence of a supernova spectrum of the most energetic class known, a "hypernova" . This is caused by the explosion of a very heavy star - presumably over 25 times heavier than the Sun. The measured expansion velocity (in excess of 30,000 km/sec) and the total energy released were exceptionally high, even within the elect hypernova class. From a comparison with more nearby hypernovae, the astronomers are able to fix with good accuracy the moment of the stellar explosion. It turns out to be within an interval of plus/minus two days of the gamma-ray burst. This unique conclusion provides compelling evidence that the two events are directly connected. These observations therefore indicate a common physical process behind the hypernova explosion and the associated emission of strong gamma

  16. 40 CFR 92.511 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... locomotives: installation audit requirements. (a) Remanufacturers of locomotives or locomotive engines shall...: installation audit requirements. 92.511 Section 92.511 Protection of Environment ENVIRONMENTAL PROTECTION..., component settings and component installations on randomly chosen locomotives in an engine family....

  17. Development of a coiled tubing cable installation system

    SciTech Connect

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  18. The Alaska earthquake, March 27, 1964: lessons and conclusions

    USGS Publications Warehouse

    Eckel, Edwin B.

    1970-01-01

    local waves. Better earthquake-hazard maps, based on improved knowledge of regional geology, fault behavior, and earthquake mechanisms, are needed for the entire country. Their preparation will require the close collaboration of engineers, seismologists, and geologists. Geologic maps of all inhabited places in earthquake-prone parts of the country are also needed by city planners and others, because the direct relationship between local geology and potential earthquake damage is now well understood. Improved and enlarged nets of earthquake-sensing instruments, sited in relation to known geology, are needed, as are many more geodetic and hydrographic measurements. Every large earthquake, wherever located, should be regarded as a full-scale laboratory experiment whose study can give scientific and engineering information unobtainable from any other source. Plans must be made before the event to insure staffing, funding, and coordination of effort for the scientific and engineering study of future earthquakes. Advice of earth scientists and engineers should be used in the decision-making processes involved in reconstruction after any future disastrous earthquake, as was done after the Alaska earthquake. The volume closes with a selected bibliography and a comprehensive index to the entire series of U.S. Geological Survey Professional Papers 541-546. This is the last in a series of six reports that the U.S. Geological Survey published on the results of a comprehensive geologic study that began, as a reconnaissance survey, within 24 hours after the March 27, 1964, Magnitude 9.2 Great Alaska Earthquake and extended, as detailed investigations, through several field seasons. The 1964 Great Alaska earthquake was the largest earthquake in the U.S. since 1700. Professional Paper 546, in 1 part, describes Lessons and Conclusions.

  19. An Analysis of Messages About Tobacco in Military Installation Newspapers

    PubMed Central

    Haddock, C. Keith; Parker, L. Carrie; Taylor, Jennifer E.; Poston, Walker S.C.; Lando, Harry; Talcott, G. Wayne

    2005-01-01

    Objectives. We sought to gauge the relative attention that tobacco control receives in military newspapers by comparing coverage of tobacco use with that of other health topics of importance to the military. Methods. We examined tobacco-related articles and industry advertisements in 793 newspapers published during 1 year at 16 representative military installations (4 Air Force, 6 Army, 2 Marine, 4 Navy). Newspaper content was coded with a standardized coding manual developed through previous research. Results. Tobacco use received the fewest instances of coverage and the least print space in military installation newspapers of all the health topics examined. The primary “message frame” used in tobacco control articles was that smokers are putting themselves at health risk, a theme that has not been found to have a strong effect on smokers. Nearly 10% of the newspapers contained tobacco advertisements. Conclusions. Tobacco control messages are underrepresented in military installation newspapers compared with other health issues. Furthermore, military newspapers send mixed messages to military personnel by providing advertisements for tobacco while also claiming that tobacco use is harmful. PMID:16043672

  20. VERA 3.5 Installation Guide

    SciTech Connect

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  1. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  2. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare to install a vehicle support post. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  3. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    In view are three vehicle support posts installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  4. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    A construction worker on the deck of the mobile launcher welds a portion of a platform for installation of a vehicle support post at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  5. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare a platform for installation of a vehicle support post. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  6. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  7. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  8. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  9. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  10. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  11. PUREX exhaust ventilation system installation test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment.

  12. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  13. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  14. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians install thermal blankets around the area where several Nanoracks will be installed on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  15. Mars Reconnaissance Orbiter After Camera Installation

    NASA Image and Video Library

    2005-01-07

    A telescopic camera called the High Resolution Imaging Science Experiment, or HiRISE, was installed onto the main structure of NASA Mars Reconnaissance Orbiter on Dec. 11, 2004 at Lockheed Martin Space Systems, Denver, Colo. HiRISE is at the top of the spacecraft in this image. Some other large components, including solar panels and the high-gain antenna, had not yet been installed. The orbiter is scheduled for launch in August 2005 carrying six science instruments. Ball Aerospace and Technology Corp., Boulder, Colo., built HiRISE for the University of Arizona, Tucson, to supply for the mission. http://photojournal.jpl.nasa.gov/catalog/PIA07210

  16. Installment sales: How they relate to timberland

    Treesearch

    William C. Siegel

    2004-01-01

    If certain conditions are met, the gain recognized on the sale of real property-such as forest land and/or standing timber-can be spread over more than one year for income tax purposes. Such sales are referred to as "installment" or "deferred payment" contracts. An outright sale, on the other hand, triggers immediate recognition of all gain in the...

  17. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) § 171.159...

  18. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  19. MS Kavandi installs cables in Quest airlock

    NASA Image and Video Library

    2001-07-16

    S104-E-5104 (16 July 2001) --- Janet L. Kavandi, STS-104 mission specialist, connects cables and hoses from the newly installed Quest Airlock to Unity Node 1. Other STS-104 and Expedition Two crewmembers are visible in the background working in the Airlock.

  20. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  1. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements. (a) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and Federal Communications Commission requirements. (b) The facility must have a... communications or reliable communications (at least a landline telephone) from the airport to the nearest Federal...

  2. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.271 Section 171.271 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS...

  3. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  4. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  5. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  6. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  7. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  8. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  9. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  10. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  11. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  12. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  13. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  14. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  15. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  16. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  17. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  18. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  19. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  20. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  1. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  2. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  3. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  4. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  5. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  6. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  7. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  8. 5 CFR 831.1807 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Installment withholdings. 831.1807 Section 831.1807 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Agency Requests to OPM for Recovery of a Debt from the Civil...

  9. 5 CFR 845.407 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 845.407 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES RETIREMENT SYSTEM-DEBT COLLECTION Agency Requests to OPM for Recovery of a Debt From the Civil Service Retirement Fund § 845.407 Installment withholdings. (a) When possible, OPM...

  10. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  11. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  12. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  13. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  14. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007213 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  15. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007212 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  16. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  17. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  18. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  19. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  20. Planning, Developing and Installing a Campus LAN.

    ERIC Educational Resources Information Center

    Foley, Francis

    Berry College (Georgia) installed a new library computer and operating system, connected five buildings via a campus local area network (LAN), added eight faculty/staff offices to the LAN, completed an Internet connection, and has a name server operating. The college has also established e-mail and limited campus accounts for 300 of its 2,000…