Science.gov

Sample records for installations um modelo

  1. Wheel Installation

    NASA Image and Video Library

    2010-07-07

    In this picture, the Curiosity rover sports a set of six new wheels. The wheels were installed on June 28 and 29 in the Spacecraft Assembly Facility at NASA Jet Propulsion Laboratory, Pasadena, Calif.

  2. Lighting installations

    NASA Technical Reports Server (NTRS)

    Schurer, Kees

    1994-01-01

    Model computations that give the lay-out of a lighting installation have to be implemented in the real world. There, deviations from the ideal performance of just about every element of the installation will be felt. A list of possible sources of non-ideal behavior, based on practical experience, are: lamps, ballasts, reflectors, mounting position, sagging of lamps, and soiling. It is clear that with all possible deviations from the ideal the homogeneity of a real lighting installation can never be as good as the one computed. The only way to make sure it is nearly as good is by measurement of the actual light distribution. Then, an occasional adjustment or replacement may often yield a satisfactory result. This measurement should really be part of the installation contract.

  3. The Practice of Research of a Basic Education Teacher Involving Mental Models of the Phases of the Moon and Eclipses. (Spanish Title: La Práctica de Investigación de un Maestro de Educación BÁsica con El Uso de los Modelos Mentales de Las Fases de la Luna Y Eclipses.) A Prática de Pesquisa de um Professor do Ensino Fundamental Envolvendo Modelos Mentais de Fases da Lua e Eclipses

    NASA Astrophysics Data System (ADS)

    Pessôa Queiroz, Glória; Jubitipan Borges de Sousa, Carlos; Auxiliadora Delgado Machado, Maria

    2009-12-01

    docente. La formación de grupos interinstitucionales para la planificación de la acción y la investigación ha resultado productiva para el trabajo de construcción de conocimiento de apoyo a los procesos educativos en la escuela, mientras que la universidad enriquece su colección de experiencias validadas, considerando los resultados de la educación inicial y continua de maestros. La participación activa del maestro en un grupo de investigación en la universidad lo llevó a reflexiones sobre los posibles caminos didácticos que pueden ser descriptos, analizados y comunicados a los demás docentes. La construcción de una pedagogía propia, que tuvo en cuenta los modelos mentales de los estudiantes sobre los temas básicos de astronomía, y los cambios desarrollados a partir de las lecciones que enseñó, trajeron consecuencias de largo alcance sobre la pedagogía adoptada por el maestro, que ahora incorpora una nueva visión de la ciencia y formas alternativas al diálogo con los estudiantes, los componentes esenciales para un investigador en Educaciónen Ciencias. A inclusão do professor da escola básica no universo da pesquisa é questão controvertida e em pleno debate no meio acadêmico. A oportunidade de trabalho coletivo que incorporou professores de uma escola municipal no Rio de Janeiro a um grupo de ensino de Física da universidade nos possibilitou vislumbrar a ressignificação da função de um professor de Ciências (co-autor deste trabalho) por ele próprio, agora passando a incluir a pesquisa sobre a construção de conhecimento pelos alunos em sua prática como docente. A formação de grupos interinstitucionais para o planejamento de ações e de pesquisas tem-se mostrado produtiva para um trabalho de construção de conhecimentos a fim de subsidiar processos educativos na escola, ao mesmo tempo em que a universidade enriquece seu acervo de experiências validadas criticamente, podendo considerar seus resultados na formação inicial e

  4. Vínculos sobre um modelo de quartessência de Chaplygin usando observações do satélite chandra da fração de massa de gás em aglomerados de galáxias

    NASA Astrophysics Data System (ADS)

    de Souza, R. S.

    2003-08-01

    Observações de Supernovas do tipo Ia mostram que a expansão do Universo está acelerando. Segundo as equações de Einstein uma componente com pressão negativa (energia escura) é necessária para explicar a aceleração cósmica. Além da energia escura é usualmente admitido que no Universo há também uma matéria exótica com pressão zero, que é chamada de matéria escura. Essa componente possui um papel fundamental na formação de estruturas no Universo. Recentemente tem se explorado a possibilidade de que matéria e energia escura poderiam ser unificadas através de uma única componente, que tem sido denominada de quartessência. Um exemplo de fluido com essas características é o Gás de Chaplygin Generalizado, que possui uma equação de estado da forma p = -A/ra. Inicialmente consideramos o caso especial a = 1 (gás de Chaplygin) e vinculamos parâmetros do modelo utilizando observações em raios-X do satélite Chandra da fração de massa de gás em aglomerados de galáxias. Uma comparação dos vínculos obtidos com esse teste com outros testes, tais como supernovas e idade do Universo, mostra que esse teste é bastante restritivo. Exibiremos ainda resultados para o caso em que a curvatura é nula e o parâmetro a está compreendido no intervalo -1 < a 1.

  5. Hopkins installs wire harnesses

    NASA Image and Video Library

    2013-11-24

    ISS038-E-008291 (24 Nov. 2013) --- NASA astronaut Michael Hopkins, Expedition 38 flight engineer, installs wire harnesses in the International Space Station?s Harmony node to support the installation of Ethernet video cables for the station?s local area network. These new cables will provide Ethernet connectivity to the visiting vehicles that dock to Harmony?s Earth-facing port.

  6. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  7. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is prepared for installation Oct. 24, 2010, at John C. Stennis Space Center. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  8. AMS Time Lapse Installation

    NASA Image and Video Library

    A time lapse video compilation of the installation of the Alpha Magnetic Spectrometer on the International Space Station’s starboard truss using the station’s robotic arm, Canadarm2, during the...

  9. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  10. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014934 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  11. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014979 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  12. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014956 (16 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  13. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014973 (17 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  14. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014952 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  15. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014930 (16 Sept. 2010) --- NASA astronaut Doug Wheelock, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  16. MARES Payload Installation

    NASA Image and Video Library

    2010-09-16

    ISS024-E-014981 (17 Sept. 2010) --- NASA astronaut Shannon Walker, Expedition 24 flight engineer, works with Muscle Atrophy Resistive Exercise System (MARES) hardware during installation of MARES payload in the Columbus laboratory of the International Space Station.

  17. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting, lowering and installation. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are eight levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  20. Installing Juno Radiation Vault

    NASA Image and Video Library

    2010-07-12

    Technicians installed a special radiation vault onto the propulsion module of NASA Juno spacecraft. Each titanium wall measures nearly a square meter nearly 10 square feet in area and about 1 centimeter a third of an inch in thickness.

  1. LH tank installation

    NASA Image and Video Library

    2011-07-25

    Stennis Space Center employees marked another construction milestone July 25 with installation of the 85,000-gallon liquid hydrogen tank atop the A-3 Test Stand. The 300-foot-tall stand is being built to test next-generation rocket engines that could carry humans into deep space once more. The liquid hydrogen tank and a 35,000-gallon liquid oxygen tank installed atop the steel structure earlier in June will provide fuel propellants for testing the engines.

  2. Modelo de galaxia disco

    NASA Astrophysics Data System (ADS)

    Ledesma, M.; Mosconi, M.

    El objetivo de este trabajo es estudiar la formación de galaxias anillo, a través de simulaciones numéricas. En el estudio numérico es necesario construir el modelo de una galaxia disco normal, en condición de equilibrio estable, que se ajuste a los parámetros observacionales disponibles de estos objetos. En dicho modelo se considera la galaxia constituída por un halo de materia oscura, un bulge y el disco propiamente dicho. A partir de perfiles de densidad obtenidos de las observaciones, se lleva a cabo la distribución espacial de las partículas, a través del ``Método del rechazo". La asignación de velocidades se realiza considerando que las partículas del disco están aproximadamente en equilibrio rotacional, y se agregan dispersiones de velocidad de acuerdo con el parámetro de Toomre Q=1.5.

  3. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, construction workers assist with the installation of the final work platform, A north, in High Bay 3, as a crane lowers the platform into place. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  4. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the final work platform, A north, for installation in High Bay 3. The platform will be installed and secured on its rail beam high up on the north wall of the high bay. In view on the platform are the American flag and a small tree. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  5. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  6. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view are five levels of platforms previously installed. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  7. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, has been lowered into place for installation on the north wall of High Bay 3. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines prepares to assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines monitors the progress during the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines turns a bolt to help secure the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, during installation in High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The B platform is being installed on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  12. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker wearing a safety harness and tethered lines assists with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    High up in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lowers the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, for installation in High Bay 3. The B platform will be installed on the north side of high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. In view below are the six levels of previously installed platforms. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  15. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    A heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3 in the Vehicle Assembly Building at the agency’s Kennedy Space Center in Florida. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  16. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle. The platform will be moved into High Bay 3 for installation on the south side of the high bay. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  17. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In this view looking up in the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a heavy-lift crane lowers the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position for installation in High Bay 3. The platform will be installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  19. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  20. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, is lowered into position for installation on the north side of High Bay 3. In view below are the seven levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  1. LOX tank installation

    NASA Image and Video Library

    2011-06-08

    Construction of the A-3 Test Stand at Stennis Space Center continued June 8 with installation of a 35,000-gallon liquid oxygen tank atop the steel structure. The stand is being built to test next-generation rocket engines that will carry humans into deep space once more. The LOX tank and a liquid hydrogen tank to be installed atop the stand later will provide propellants for testing the engines. The A-3 Test Stand is scheduled for completion and activation in 2013.

  2. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is hoisted into place at the E-2 Test Stand at John C. Stennis Space Center on Oct. 24, 2010. The unit was installed at the E-2 stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  3. CSG delivery and installation

    NASA Image and Video Library

    2010-10-22

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand arrived at John. C. Stennis Space Center on Oct. 22, 2010. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  4. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    John C. Stennis Space Center employees complete installation of a chemical steam generator (CSG) unit at the site's E-2 Test Stand. On Oct. 24, 2010. The unit will undergo verification and validation testing on the E-2 stand before it is moved to the A-3 Test Stand under construction at Stennis. Each CSG unit includes three modules. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  5. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    In High Bay 3 inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist during installation of the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  6. T2 Install Operations

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043639 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  7. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    A close-up view of an American flag and a small tree on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  8. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag and a small tree are in view on the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  9. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    The American flag can be seen hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  10. Platform A North Installation

    NASA Image and Video Library

    2017-01-12

    In a view from below, the American flag is in view hanging from the final work platform, A north, as the platform is lifted up by crane from the transfer aisle in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be installed and secured on its rail beam high up on the north wall of High Bay 3. The installation of the final topmost level completes the 10 levels of work platforms, 20 platform halves altogether, that will surround NASA's Space Launch System rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. The A-level platforms will provide access to the Orion spacecraft's Launch Abort System for Orion lifting sling removal and installation of the closeout panels. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB, including installation of the new work platforms.

  11. Digital Sculpture Installations

    ERIC Educational Resources Information Center

    Sherwood, Catherine

    2006-01-01

    This author relates how she came upon the idea of using an image-editing program to virtually install monumental sculptures into real-life landscapes in her desire to bring technology and sculpture together in her art class. In this article, she describes how she made her class create tabletop-sized sculptures and photographs of digital…

  12. Solenoidal Magnet Installation

    SciTech Connect

    Stredde, H.; Lee, A.; /Fermilab

    1998-01-21

    The major modification to the D0 detector for the next physics collider run is the upgrade of the central tracking system. The first component to be installed will be the solenoid magnet, with the central pre-shower attached. This engineering note is directed to the installation of the solenoid magnet and the equipment needed to accomplish this task. As part of the installation process, the main detector must undergo a change in position of one of its major components, namely the South End Calorimeter (SEC). This calorimeter must be completely decoupled from the main detector, i.e. all cabling and cryo lines removed. The equipment used for installing all calorimeters (bridge and support structures) will be put into position and the calorimeter (SEC) will be pulled off of the detector center beam and parked on the south sidewalk of the D0 Assembly Hall. The necessary cryo lines will re-connected in order to keep the cryostat cold. This calorimeter will remain here during the greater portion of the upgrade reconfiguration schedule. When this task is finished, the old central tracking system and its mounts will be removed from the bore of the Central Calorimeter (CC). The main detector is now ready to receive the new tracking system, starting with the solenoid magnet.

  13. Leadership for Sustainable Installations

    DTIC Science & Technology

    2011-04-01

    leading sustainable installations. What is Sustainability? Sustainability has its roots in the business world in the concept of corporate social ... responsibility (CSR). Cynics may say the CSR was a marketing ploy to establish a positive public perception of businesses in the wake of several well

  14. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lowers the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  15. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, up from the floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  16. Platform E South Installation

    NASA Image and Video Library

    2016-08-26

    A heavy-lift crane lifts the first half of the E-level work platforms, E south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The E platform will be installed on the south side of High Bay 3, about 246 feet above the floor. The E platforms are the sixth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  17. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    Construction workers wearing safety harnesses and tethered lines assist with the installation of the second half of the B-level work platforms, B north, for NASA’s Space Launch System (SLS) rocket, high up in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. They are securing the large bolts that hold the platform securely in place on the north side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  18. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    A heavy-lift crane lifts the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B platform will be installed on the south side of High Bay 3. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, high above the floor of the transfer aisle in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be lowered into High Bay 3 for installation on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  20. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A crane lifts the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, high up in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The B north platform will lowered into High Bay 3 for installation on the north side of the high bay. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  1. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lifted up by crane in the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The platform will be lowered into High Bay 3 and installed on the north side of the high bay. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  2. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  3. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    High up in High Bay 3 inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket, has been lowered into place. In view below are several levels of previously installed platforms. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  4. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker makes adjustments to a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers use specialized tools to help secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  6. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform D Installation

    NASA Image and Video Library

    2016-09-09

    Construction workers help to secure the second half of the D-level work platforms, D north, for NASA’s Space Launch System (SLS) rocket, into position in High Bay 3 in the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The D platform is being installed on the north side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  8. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A construction worker monitors the progress, as a heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  9. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    In this view from above, a heavy-lift crane lowers the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of the high bay. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  11. Platform D South Installation

    NASA Image and Video Library

    2016-08-29

    A heavy-lift crane lifts the first half of the D-level work platforms, D south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The D platform will be installed on the south side of High Bay 3. The D platforms are the seventh of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s journey to Mars.

  12. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    The second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, is lowered by crane for installation on the north side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  13. Platform B North Installation

    NASA Image and Video Library

    2016-12-16

    A construction worker solders a section of steel during the installation of the second half of the B-level work platforms, B north, for NASA's Space Launch System (SLS) rocket, in High Bay 3 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Construction workers will secure the large bolts that hold the platform in place on the north wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  14. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  15. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  16. Mineral mining installations

    SciTech Connect

    Werner, G.; Wisniewski, P.

    1983-12-15

    A mineral mining installation serves to win mineral by explosive blasting. The installation employs a shuttle conveyor arranged alongside a mineral face. Roof supports stand side-by-side at the side of the conveyor remote from the conveyor. The roof supports are connected to the conveyor through shifting rams and have roof-engageable caps or the like supported on hydraulic props. The pans of the conveyor have upstanding walls at the rear side nearest the roof supports which carry rails at their upper ends. The roof caps have wall components pivoted thereto and hydraulic piston and cylinder units serve to swing the wall components up and down. When explosive blasting takes place the wall components are swung down to engage on the walls of the conveyor pans to form a screen between the winning region and the access region of the working.

  17. Engineering and Installation Services

    DTIC Science & Technology

    2007-11-02

    Update data on existing communications and information systems on the Communica- tions and Information Systems Installation Records ( CSIR ) according to...information by two different survey methods: desk top and on-site. 4.9.1.1. Perform desktop surveys by using CSIRs , available data, and telephone...and equipment. 4.15. Project Drawings . Upon project completion, the team chief annotates two sets of CSIR drawings. The team chief leaves one set with

  18. Samus Toroid Installation Fixture

    SciTech Connect

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  19. Seafloor manifold center installed

    SciTech Connect

    Edmiston, K.

    1982-07-01

    The Shell/Esso Underwater Manifold Center (UMC), designed and tested as a diverless production facility, is a significant step toward really deep water oil and gas production. In May 1982, the 2100 metric ton unit was towed 645 miles from its Dutch fabrication yard and precisely emplaced in 500 ft water in the Cormorant field in only 6 days. When fully installed with all of its wells drilled and testing completed, the UMC will have cost an estimated $700 million. During its anticipated 25 yr operating life, the UMC is expected to produce ca 110 million bbl from the central Cormorant area. Design and operational criteria are described.

  20. Mineral mining installation

    SciTech Connect

    Plevak, L.; Weirich, W.

    1982-04-20

    A longwall mineral mining installation has a longwall conveyor and a plurality of roof support units positioned side-by-side at the goaf side of the conveyor. The hydraulic appliances of the roof support units, such as their hydraulic props, hydraulic advance rams and hydraulic control valves, are supplied with pressurized hydraulic fluid from hydraulic supply lines which run along the goaf side of the conveyor. A plurality of flat, platelike intermediate members are provided at the goaf side of the conveyor. These intermediate members are formed with internal ducts for feeding the hydraulic fluid from the supply lines to the hydraulic appliances of the roof support units.

  1. Heating equipment installation system

    DOEpatents

    Meuschke, Robert E.; Pomaibo, Paul P.

    1991-01-01

    A method for installing a heater unit assembly (52, 54) in a reactor pressure vessel (2) for performance of an annealing treatment on the vessel (2), the vessel (2) having a vertical axis, being open at the top, being provided at the top with a flange (6) having a horizontal surface, and being provided internally, at a location below the flange (6), with orientation elements (8) which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture (10) having an upwardly extending guide member (18) and orientation elements (14, 16) and installing the orientation fixture (10) in the vessel (2) so that the orientation elements (14,16) of the orientation fixture (10) mate with the orientation elements (8) of the pressure vessel (2) in order to establish a defined position of the orientation fixture (10) in the pressure vessel (2), and so that the guide member (18) projects above the pressure vessel (2) flange (6); placing a seal ring (30) in a defined position on the pressure vessel (2) flange (6) with the aid of the guide member (18); mounting at least one vertical, upwardly extending guide stud (40) upon the seal ring (30); withdrawing the orientation fixture (10) from the pressure vessel (2); and moving the heater unit assembly (52,54) vertically downwardly into the pressure vessel (2) while guiding the heater unit assembly (52,54) along a path with the aid of the guide stud (40).

  2. Seal ring installation tool

    NASA Technical Reports Server (NTRS)

    Haselmaier, L. Haynes (Inventor)

    2004-01-01

    A seal ring tool that allows an installer to position a primary seal ring between hub ends of pipe flanges that are being assembled together. The tool includes a pivoting handle member and extension arms attached to the pivoting handle member. The ends of the arms have side indentation type longitudinal grooves angled toward one another for holding the primary seal ring in place between the hubs of respective pipes that are to be attached together. The arms of the tool can also have flat sides that can be used to abut against an optional second larger seal that is supported within a groove in one of the hub ends so that the second hub end can then be moved against the other side of the primary seal ring. Once the seal ring is positioned between the pipe hubs, the pipe hubs can be moved about the seal ring due to the flat sides of the arms of the tool. The tool eliminates the chances of damaging and contaminating seal rings being installed within pipe hubs that are being attached to one another.

  3. Radiator Design and Installation

    NASA Technical Reports Server (NTRS)

    Brevoort, M.J.; Leifer, M.

    1939-01-01

    The fundamental principles of fluid flow, pressure losses, and heat transfer have been presented and analyzed for the case of a smooth tube with fully developed turbulent flow. These equations apply to tubes with large length-diameter ratios where the f1ow is at a high Reynolds Number. The error introduced by using these equations increases as the magnitude of the tube length and the air-flow Reynolds Number approaches the values encountered in modern radiator designs. Accordingly, heat-transfer tests on radiator sections were made and the results are presented in nondimensional form to facilitate their use and for comparison with other heat-transfer data. In addition, pressure losses were measured along smooth tubes of circular, square, and rectangular cross section and the results were also correlated and are presented in nondimensional form. The problem of a radiator design for a particular installation is solved, the experimental heat-transfer and pressure-loss data being used, on a basis of power chargeable to the radiator for form drag, for propelling the weight, and for forcing the air through the radiator. The case of an installation within a wing or an engine nacelle is considered. An illustration of radiator design is carried through for an arbitrary set of conditions. Sufficient detail is given to enable the reader to reproduce the analysis for any given case.

  4. Platform B South Installation

    NASA Image and Video Library

    2016-12-02

    Inside the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, a construction worker watches as the first half of the B-level work platforms, B south, for NASA’s Space Launch System (SLS) rocket is lowered into place in High Bay 3. Construction workers will secure the large bolts that hold the platform in place on the south wall. The B platforms are the ninth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  5. Installing fiber insulation

    NASA Technical Reports Server (NTRS)

    Wang, D. S.; Warren, A. D. (Inventor)

    1980-01-01

    A method for installing fragile, high temperature insulation batting in an elongated cavity or in a resilient wire sleeve to form a resilient seal. The batting is preformed to rough dimensions and wrapped in a plastic film, the film being of a material which is fugitive at a high temperature. The film is heat sealed and trimmed to form a snugly fit skin which overlaps at least at one end to permit attachment of a pull cord. The film absorbs the tensile force of pulling the film enclosed batting through the cavity or wire mesh sleeve and is subsequently driven off by high temperature baking, leaving only the insulation in the cavity or wire mesh sleeve.

  6. CATS Installed on ISS

    NASA Image and Video Library

    2017-09-28

    On Jan. 22, 2015, robotic flight controllers successfully installed NASA’s Cloud Aerosol Transport System (CATS) onboard the International Space Station. CATS will collect data about clouds, volcanic ash plumes and tiny airborne particles that can help improve our understanding of aerosol and cloud interactions, and improve the accuracy of climate change models. CATS had been mounted inside the SpaceX Dragon cargo craft’s unpressurized trunk since it docked at the station on Jan. 12. Ground controllers at NASA’s Johnson Space Center in Houston, Texas, used one of the space station’s robotic arms, called the Special Purpose Dexterous Manipulator, to extract the instrument from the capsule. The NASA-controlled arm passed the instrument to a second robotic arm— like passing a baton in a relay race. This second arm, called the Japanese Experiment Module Remote Manipulator System, is controlled by the Japanese Aerospace Exploration Agency. The Japanese-controlled arm installed the instrument to the Space Station’s Japanese Experiment Module, making CATS the first NASA-developed payload to fly on the Japanese module. CATS is a lidar remote-sensing instrument designed to last from six months to three years. It is specifically intended to demonstrate a low-cost, streamlined approach to developing science payloads on the space station. CATS launched aboard the SpaceX Dragon spacecraft on Jan. 10 at Cape Canaveral Air Force Station in Florida. To learn more about the impact of CATS data, visit: www.nasa.gov/cats/ NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  7. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  8. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  9. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  10. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  11. 30 CFR 57.4504 - Fan installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and...

  12. Nuclear reactor installation

    SciTech Connect

    Straub, H.

    1987-09-29

    A nuclear reactor installation is described comprising a pressure vessel having a pair of concentric walls defining a peripheral chamber therebetween; a reactor core disposed within the pressure vessel for heating a primary coolant; a cooling circuit for conveying a secondary coolant in heat exchange relation with the primary coolant. The circuit includes at least one primary heat exchanger within the pressure vessel, at least one secondary heat exchanger outside the pressure vessel, coolant lines extending through the pressure vessel and connecting the heat exchanges together, and circulating means for circulating a secondary coolant through the heat exchangers; a heat sink extending around the pressure vessel; a source of at least one flowable heat-insulating agent outside the pressure vessel; a source of at least one flowable heat-conductive agent outside the pressure vessel; first means communicating the source of heat-insulating agent with the peripheral chamber during normal operation of the reactor core; and second means communicating the source of heat-conductive agent with the peripheral chamber to fill the chamber with heat-conductive agent in response to a disturbance in reactor core cooling.

  13. Mineral mining installation

    SciTech Connect

    Weirich, W.

    1984-01-24

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a springloaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  14. Mineral mining installation

    SciTech Connect

    Becker, K.; Rosenberg, H.; Weirich, W.

    1981-12-29

    A longwall mineral mining installation has a conveyor and a plurality of roof support units positioned side-by-side on the goaf side of the conveyor. Each roof support unit has a roof shield having an advanceable shield extension. Each unit has a first hydraulic ram for extending its shield extension, and a second hydraulic ram for advancing the conveyor. The extension of each first ram is controlled in dependence upon the retraction of one of the second rams (Either the second ram of the same unit or that of an adjacent unit). This control is effected by controlling the supply of pressurized hydraulic fluid to the first rams. In one embodiment this is carried out by a control valve which has a spring-loaded plunger which engages with a series of equispaced cams on the movable cylinder of the associated second ram. In another embodiment, the piston rods of the rams are provided with series of equispaced magnets. The cylinders of the rams are provided with sensors, which sense the magnets and generate control signals. A control box is provided to direct the control signals to control valves associated with the rams, so that the first rams are extended by the same distance as that through which the second rams are retracted.

  15. Antares Fairing Installed

    NASA Image and Video Library

    2017-09-27

    The payload fairing is installed on the Orbital Sciences Antares rocket at the Horizontal Integration Facility at NASA's Wallops Flight Facility on Virginia's Eastern Shore, Tuesday, July 8, 2014. The Antares rocket is scheduled to roll-out to Virginia's Mid-Atlantic Regional Spaceport Pad 0A Wednesday, July 9, ahead of its scheduled launch July 11. The Antares rocket will carry Orbital's unmanned Cygnus spacecraft to the International Space Station. This Orbital-2 mission's cargo is more than 3,000 pounds of supplies for the station, including science experiments to expand the research capability of the Expedition 40 crew members aboard the orbiting laboratory, crew provisions, spare parts and experiment hardware. Credit: NASA's Wallops Flight Facility NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  16. Longwall mineral mining installation

    SciTech Connect

    Becker, K.; Beyer, H.

    1982-09-14

    A longwall mineral mining installation comprises a scraper-chain conveyor having a scraper assembly, a first straight conveyor portion extending along the longwall working, a second straight conveyor portion extending along a roadway positioned at one end of the longwall working, and a curved conveyor section connecting the two straight conveyor portions. A guide assembly is provided for guiding the scraper assembly around the curved conveyor section. A guide is fixed to the face side of the first straight conveyor portion, and a winning machine is reciprocable along the guide. A drive station is mounted on the goaf side of the first straight conveyor portion in the region of the curved conveyor section. A drive sprocket is rotatably mounted on the face side of the first straight conveyor portion in said region. The drive sprocket drives the winning machine via a drive chain. A drive shaft drivably connects the drive station and the drive sprocket. The drive station includes a drive motor whose axis of rotation is substantially parallel to the longitudinal axis of the first straight conveyor portion, and the guide is angled away from the first straight conveyor portion in said region.

  17. Proper Installation Improves Carpet Life.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Explains how proper carpet installation can add to carpet life; includes tips to consider before signing a carpet-installation purchasing agreement that can make the new carpet a better investment. Topics cover how color selection lengthens appearance life, the need for moisture testing, the importance of carpet seams in the purchasing process,…

  18. FDDI Installation and Performance Analysis

    DTIC Science & Technology

    1992-12-01

    controlled by a Motorola 68030 32-bit microprocessor which controls all of the onboard functions. The LANplex 5012 has 12 expansion slots on an...27 March 1990. [14] Sun FDDI/DX Software and Hardware Installation Guide. [15] LANplex 5004 and 5012 Installation Guide. [16] M68000 8-/16-132-Bit

  19. Solar Installation Labor Market Analysis

    SciTech Connect

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  20. Installing Electronics in Juno Vault

    NASA Image and Video Library

    2010-12-16

    Technicians install components that will aid with guidance, navigation and control of NASA Juno spacecraft. Like most of Juno sensitive electronics, these components are situated within the spacecraft titanium radiation vault.

  1. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043691 (30 Sept. 2009) --- NASA astronaut Nicole Stott, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  2. Achieving Efficiencies in Army Installations.

    DTIC Science & Technology

    2007-11-02

    34" ’■■"■" 1 USAWC STRATEGY RESEARCH PROJECT Achieving Efficiencies in Army Installations by Richard Fliss Col. Richard M. Meinhart Project...government agency. STRATEGY RESEARCH PROJECT ACHIEVING EFFICIENCIES IN ARMY INSTALLATIONS BY RICHARD FLISS DISTRIBUTION STATEMENT A: Approved...for public release. Distribution is unlimited. DTIC QUALITY INSPECTED & USAWC CLASS OF 1998 U.S. ARMY WAR COLLEGE, CARLISLE BARRACKS, PA 17013-5050

  3. Application-Program-Installer Builder

    NASA Technical Reports Server (NTRS)

    Wolgast, Paul; Demore, Martha; Lowik, Paul

    2007-01-01

    A computer program builds application programming interfaces (APIs) and related software components for installing and uninstalling application programs in any of a variety of computers and operating systems that support the Java programming language in its binary form. This program is partly similar in function to commercial (e.g., Install-Shield) software. This program is intended to enable satisfaction of a quasi-industry-standard set of requirements for a set of APIs that would enable such installation and uninstallation and that would avoid the pitfalls that are commonly encountered during installation of software. The requirements include the following: 1) Properly detecting prerequisites to an application program before performing the installation; 2) Properly registering component requirements; 3) Correctly measuring the required hard-disk space, including accounting for prerequisite components that have already been installed; and 4) Correctly uninstalling an application program. Correct uninstallation includes (1) detecting whether any component of the program to be removed is required by another program, (2) not removing that component, and (3) deleting references to requirements of the to-be-removed program for components of other programs so that those components can be properly removed at a later time.

  4. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.220 Installations. (a) The installation requirements for machinery and boilers for steam and...) Gas turbine machinery installations; (2) Air screws; (3) Hydraulic jets; and (4)...

  5. Gas appliance and installation quality

    SciTech Connect

    Dance, E.W.G.; Mulholland, P.M.

    1988-01-01

    British Gas plc only sells and installs domestic gas appliances which conform to the requirements of a third party certification scheme. This involves type testing of appliance prototypes, assessment of the manufacturers quality system and quality auditing of production appliances. This certification is augmented by additional quality auditing of appliances both in the factory and at British Gas warehouses. In order to achieve the quality objectives of safety and customer satisfaction comprehensive installation procedures and practices have been developed which are designed to deal with large installation and servicing workload. The quality standards achieved are independently assessed by market research into customers reactions. This competence of service engineers is maintained and enhanced by regular training and education and high standards of performance at regional and local level are rewarded through annual national competitions.

  6. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  7. Aasgard subsea installation on schedule

    SciTech Connect

    Perdue, J.M.

    1998-09-01

    Statoil`s Aasgard A FPSO vessel is set to sail away from the Aker Stord yard on November 22, 1998, and construction of the Aasgard B semisubmersible gas platform has begun at the Daewoo yard in Korea. While Aasgard A and Aasgard B are receiving a lot of attention on land, the Aasgard subsea installation is quietly being readied for the big day.

  8. SUB-SLAB PROBE INSTALLATION

    EPA Science Inventory

    Sub-slab sampling has become an integral part of vapor intrusion investigations. It is now recommended in guidance documents developed by EPA and most states. A method for sub-slab probe installation was devised in 2002, presented at conferences through 2005, and finally docume...

  9. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043681 (30 Sept. 2009) --- Canadian Space Agency astronaut Robert Thirsk, Expedition 20 flight engineer, assembles and installs the Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  10. Temperature rise of installed FCC

    NASA Technical Reports Server (NTRS)

    Hankins, J. D.

    1976-01-01

    Report discusses temperature profiles of installed FCC for wood and tile surfaces. Three-conductor FCC was tested at twice nominal current-carrying capacity over bare floor and under carpet, with result indicating that temperature rise is not a linear function of current with FCC at this level.

  11. Rack installation in the JPM

    NASA Image and Video Library

    2008-06-04

    S124-E-006279 (4 June 2008) --- Japan Aerospace Exploration Agency (JAXA) astronaut Akihiko Hoshide, STS-124 mission specialist, smiles for a photo as he works in the newly installed Kibo Japanese Pressurized Module (JPM) of the International Space Station while Space Shuttle Discovery is docked with the station.

  12. Vessels installed at A-3

    NASA Image and Video Library

    2009-09-25

    Construction of the A-3 Test Stand approaches another milestone with delivery and installation of water, isopropyl alcohol (IPA) and liquid oxygen (LOX) tanks. The three LOX tanks shown on the left and the two IPA tanks shown on the right are all 35,000 gallons each. The four water tanks in the center are 39,000 gallons each.

  13. Horizontal drilling installs dutch waterline

    SciTech Connect

    Not Available

    1986-08-01

    A 32-in. potable water line system, installed by Van Eijk Leidingen B.V. in Holland, was laid through an intensively cultivated vegetable gardening area, and designed to furnish additional irrigation water. Using a horizontally drilled 42-in. hole under the Maasdijk, though a difficult job, reduced the length by more than 3 miles.

  14. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  15. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  16. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  17. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  18. 40 CFR 90.128 - Installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards and Certification Provisions § 90.128 Installation instructions. (a) If you sell an engine for... the delayed requirements for small-volume equipment manufacturers. (b) You do not need installation... how you will ensure that each installer is informed of the installation requirements. (d)...

  19. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  20. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  1. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  2. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  3. 46 CFR 129.395 - Radio installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Radio installations. 129.395 Section 129.395 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.395 Radio installations. A separate circuit, with overcurrent protection at the switchboard, must be provided for at least one radio installation. Additional...

  4. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  5. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  6. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  7. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  8. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  9. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  10. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  11. 46 CFR 129.356 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 129.356 Section 129.356 Shipping... INSTALLATIONS Power Sources and Distribution Systems § 129.356 Battery installations. (a) Large. Each large battery-installation must be located in a locker, room, or enclosed box dedicated solely to the storage of...

  12. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  13. 46 CFR 183.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Battery installations. 183.354 Section 183.354 Shipping...) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely...

  14. Engineering report for simulated riser installation

    SciTech Connect

    Brevick, C.H., Westinghouse Hanford

    1996-05-09

    The simulated riser installation field tests demonstrated that new access ports (risers) can be installed safely, quickly, and economically in the concrete domes of existing underground single- shell waste storage tanks by utilizing proven rotary drilling equipment and vacuum excavation techniques. The new riser installation will seal against water intrusion, provide as table riser anchored to the tank dome, and be installed in accordance with ALARA principles. The information contained in the report will apply to actual riser installation activity in the future.

  15. T2 (COLBERT) treadmill Installation

    NASA Image and Video Library

    2009-09-30

    ISS020-E-043705 (30 Sept. 2009) --- European Space Agency astronaut Frank De Winne (left foreground) and Canadian Space Agency astronaut Robert Thirsk (center foreground); along with NASA astronauts Nicole Stott and Michael Barratt, all Expedition 20 flight engineers, pose for a photo with the newly installed Combined Operational Load Bearing External Resistance Treadmill (COLBERT) in its temporary place in the Harmony node of the International Space Station.

  16. Mounting clips for panel installation

    DOEpatents

    Cavieres, Andres; Al-Haddad, Tristan; Goodman, Joseph

    2017-07-11

    A photovoltaic panel mounting clip comprising a base, central indexing tabs, flanges, lateral indexing tabs, and vertical indexing tabs. The mounting clip removably attaches one or more panels to a beam or the like structure, both mechanically and electrically. It provides secure locking of the panels in all directions, while providing guidance in all directions for accurate installation of the panels to the beam or the like structure.

  17. Simplified installation of thrust bearings

    NASA Technical Reports Server (NTRS)

    Sensenbaugh, N. D.

    1980-01-01

    Special handling sleeve, key to method of installing thrust bearings, was developed for assembling bearings on shaft of low-pressure oxygen turbo-pump. Method eliminates cooling and vacuum-drying steps which saves time, while also eliminating possibility of corrosion formation. Procedure saves energy because it requires no liquid nitrogen for cooling shaft and no natural gas or electric power for operating vacuum oven.

  18. SSOD Removal and NRCSD Install

    NASA Image and Video Library

    2014-01-30

    ISS038-E-040103 (30 Jan. 2014) --- Japan Aerospace Exploration Agency astronaut Koichi Wakata, Expedition 38 flight engineer, prepares to install a Cubesat deployer, also known as the Small Satellite Orbital Deployer (SSOD), inside the airlock in the International Space Station's Kibo laboratory. The SSOD is scheduled to release a set of six tiny satellites known as NanoRacks Cubesats on Feb. 6. The Cubesats were delivered Jan. 12 aboard Orbital Sciences' Cygnus commercial cargo craft.

  19. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  20. Newly Installed S-1 Truss

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Launched October 7, 2002 aboard the Space Shuttle Orbiter Atlantis, the STS-112 mission lasted 11 days and performed three sessions of Extra Vehicular Activity (EVA). Its primary mission was to install the Starboard (S1) Integrated Truss Structure and Equipment Translation Aid (CETA) Cart to the International Space Station (ISS). The S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators. The truss is 45-feet long, 15-feet wide, 10-feet tall, and weighs approximately 32,000 pounds. The CETA is the first of two human-powered carts that will ride along the International Space Station's railway providing a mobile work platform for future extravehicular activities by astronauts. This is a view of the newly installed S1 Truss as photographed during the mission's first scheduled EVA. The Station's Canadarm2 is in the foreground. Visible are astronauts Piers J. Sellers (lower left) and David A. Wolf (upper right), both STS-112 mission specialists.

  1. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  2. 47 CFR 80.955 - Radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... have a minimum of two VHF radiotelephone installations in operating condition meeting the provisions of this subpart. The second VHF installation must be electrically separate from the first VHF...

  3. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  4. Installation of Curiosity Wheels and Suspension

    NASA Image and Video Library

    2010-07-05

    With the wheels and suspension system already installed onto one side of NASA Mars rover Curiosity the previous day, spacecraft engineers and technicians prepare the other side mobility subsystem for installation on June 29, 2010.

  5. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  6. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  7. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  8. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  9. 14 CFR 25.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant General § 25.901 Installation. (a) For the purpose of this part, the airplane powerplant installation includes each component that— (1) Is necessary...

  10. Análise da aplicação e dos resultados do modelo OPM3® para a área da saúde

    PubMed Central

    Augusto dos Santos, Luis; de Fátima Marin, Heimar

    2015-01-01

    Esta pesquisa procurou analisar se um modelo de questionário criado por uma comunidade internacional de gerenciamento de projetos e se é aplicavél a organizações voltadas a área de saúde. O modelo OPM3® (Organizational Project Management Maturity Model) foi criado para que organizações de qualquer área ou porte pudessem identificar a presença, ou ausência, de boas práticas de gerenciamento. O objetivo da aplicação desse modelo é avaliar sempre a organização e não o entrevistado. No presente artigo, são apresentados os resultados da aplicação desse modelo em uma organização que possuía produtos e serviços de tecnologia da informação aplicados à área de saúde. Este estudo verificou que o modelo é aplicável de forma rápida e que a organização analisada possuía um número expressivo de boas práticas. PMID:26924862

  11. Automated solar collector installation design

    DOEpatents

    Wayne, Gary; Frumkin, Alexander; Zaydman, Michael; Lehman, Scott; Brenner, Jules

    2014-08-26

    Embodiments may include systems and methods to create and edit a representation of a worksite, to create various data objects, to classify such objects as various types of pre-defined "features" with attendant properties and layout constraints. As part of or in addition to classification, an embodiment may include systems and methods to create, associate, and edit intrinsic and extrinsic properties to these objects. A design engine may apply of design rules to the features described above to generate one or more solar collectors installation design alternatives, including generation of on-screen and/or paper representations of the physical layout or arrangement of the one or more design alternatives.

  12. Change-state selector installed

    SciTech Connect

    Craig, S.L.; Nolen, J.A.; Phillips, D.

    1995-08-01

    The installation and early operation of the new charge-state selector after the PII linac was described above. Previous to the use of this device all charge states of beams stripped between the PII and Booster linacs entered the Booster. The beam power of the unused charge states often caused quenching of superconducting solenoids in the Booster. This problem is completely eliminated by the charge-state selector. It also eliminates the need to use {open_quotes}guide beams{close_quotes} from the tandem when tuning heavy beams which required stripping.

  13. EVA 5 - Grunsfeld installs radiator

    NASA Image and Video Library

    2002-03-08

    STS109-315-007 (8 March 2002) --- Astronaut John M. Grunsfeld, STS-109 payload commander, anchored on the end of the Space Shuttle Columbia’s Remote Manipulator System (RMS) robotic arm, moves toward the giant Hubble Space Telescope (HST) temporarily hosted in the orbiter’s cargo bay. Astronaut Richard M. Linnehan (out of frame) works in tandem with Grunsfeld during this fifth and final session of extravehicular activity (EVA). Activities for the space walk centered around the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS) to install a Cryogenic Cooler and its Cooling System Radiator.

  14. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  15. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  16. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  17. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  18. 46 CFR 182.220 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) MACHINERY INSTALLATION Propulsion Machinery § 182.220 Installations. (a) Except as otherwise provided in this section, propulsion machinery installations must comply with the provisions of this part. (b) The...) Propulsion machinery of an unusual type for small passenger vessels must be given separate consideration...

  19. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  20. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  1. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  2. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  3. 21 CFR 820.170 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Installation. 820.170 Section 820.170 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES QUALITY SYSTEM REGULATION Handling, Storage, Distribution, and Installation § 820.170 Installation. (a...

  4. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  5. Sprinkler System Installer. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    Chinien, Chris; Boutin, France

    This analysis covers tasks performed by a sprinkler system installer, an occupational title some provinces and territories of Canada have also identified as pipefitter--fire protection mechanic specialty; sprinkler and fire protection installer; sprinkler and fire protection systems installer; and sprinkler fitter. A guide to analysis discusses…

  6. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  7. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  8. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  9. 46 CFR 120.354 - Battery installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installations. 120.354 Section 120.354 Shipping... and Distribution Systems § 120.354 Battery installations. (a) Large batteries. Each large battery installation must be located in a locker, room or enclosed box solely dedicated to the storage of batteries...

  10. Improve Carpet Life with Proper Installation.

    ERIC Educational Resources Information Center

    Grogan, Ralph

    1998-01-01

    Provides guidance on ways to extend carpet life in educational facilities by paying attention to the details of carpeting installation. Issues to consider include choosing carpeting to meet specific usage requirements, are fiber protectorants used, is the installation properly done by qualified installers, and is moisture testing done prior to…

  11. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2011-10-01 2011-10-01 false Radiotelephone installations. 183.392 Section...

  12. 46 CFR 183.392 - Radiotelephone installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.392 Radiotelephone installations. A separate circuit, with overcurrent protection at the main distribution panel, must be provided... 46 Shipping 7 2010-10-01 2010-10-01 false Radiotelephone installations. 183.392 Section...

  13. VIRUS early installation and commissioning

    NASA Astrophysics Data System (ADS)

    Tuttle, Sarah E.; Hill, Gary J.; Vattiat, Brian L.; Lee, Hanshin; Drory, Niv; Kelz, Andreas; Ramsey, Jason; Peterson, Trent; Noyola, Eva; DePoy, Darren L.; Marshall, Jennifer L.; Chonis, Taylor S.; Dalton, Gavin; Fabricius, Maximilian; Farrow, Daniel; Good, John M.; Haynes, Dionne M.; Indahl, Briana; Jahn, Thomas; Kriel, Hermanus; Nicklas, Harald; Montesano, Francesco; Prochaska, Travis; Allen, Richard D.; Landriau, Martin; MacQueen, Phillip J.; Roth, Martin M.; Savage, Richard; Snigula, Jan M.

    2016-08-01

    VIRUS is a massively replicated spectrograph built for HETDEX, the Hobby Eberly Telescope Dark Energy Experiment. It consists of 156 channels within 78 units fed by 34944 fibers over the 22 arcminute field of the upgraded HET. VIRUS covers a relatively narrow bandpass (350-550nm) at low resolution (R 700) to target the emission of Lyman-alpha emitters (LAEs) for HETDEX. VIRUS is a first demonstration of industrial style assembly line replication in optical astronomy. Installation and testing of VIRUS units began in November of 2015. This winter we celebrated the first on sky instrument activity of the upgraded HET, using a VIRUS unit and LRS2-R (the upgraded facility Low Resolution Spectrograph for the HET). Here we describe progress in VIRUS installation and commissioning through June 2016. We include early sky data obtained to characterize spectrograph performance and on sky performance of the newly upgraded HET. As part of the instrumentation for first science light at the HET, the IFU fed spectrographs were used to test a full range of telescope system functionality including the field calibration unit (FCU).We also use placement of strategic IFUs to map the new HET field to the fiber placement, and demonstrate actuation of the dithering mechanism key to HETDEX observations.

  14. Wind profiler installed in Antarctica

    NASA Astrophysics Data System (ADS)

    Balsley, B. B.; Carey, J.; Woodman, R. F.; Sarango, M.; Urbina, J.; Rodriguez, R.; Ragaini, E.

    A VHF (50 MHz) wind profiler was installed in Antarctica at the Peruvian Base “Machu Picchu” on King George Island from January 21 to 26. The wind profiler will provide a first look at atmospheric dynamics over the region.The profiler—the first of its kind in Antarctica—is a National Science Foundationsponsored cooperative project of the University of Colorado, the Geophysical Institute of Peru, the University of Piura (Peru), and the Peruvian Navy. This venture was also greatly facilitated by Peru's Comision Nacional de Asuntos Antartidos and Consejo Nacional de Ciencias y Tecnologia, with additional logis tics support provided by the Argentinean Navy and the Uruguayan Air Force.

  15. Installation of an offshore structure

    SciTech Connect

    Will, S.A.; Young, C.E.

    1981-04-07

    In the installation of a jacket or substructure component of an offshore platform on the sea floor over an underwater fixture containing one or more wellheads, a jacket is first ballasted to rest in a vertical orientation on the sea floor. Power winches are mounted atop the jacket above the water line and anchored mooring lines are connected to the winches via fairlead sheaves which define points of attachment for the mooring lines to the jacket. The jacket is deballasted to float with a near sea bottom clearance and is maneuvered horizontally with the power winches toward the underwater fixture. Docking guides carried by the jacket engage vertical guideposts driven drilled into the sea floor at preselected locations relative to the underwater fixture to align the jacket with the underwater fixture. The jacket is then lowered into the desired on-bottom position during controlled ballasting procedures. Finally, piles are driven through hollow jacket columns to anchor the jacket to the sea bottom.

  16. Device for installing rocket engines

    NASA Technical Reports Server (NTRS)

    George, T. R., Jr. (Inventor)

    1976-01-01

    A device for installing rocket engines is reported that is supported at a cant relative to vertical by an axially extensible, tiltable pedestal. A lifting platform supports the rocket engine at its thrust chamber exit, including a mount having a concentric base characterized by a concave bearing surface, a plurality of uniformly spaced legs extended radially from the base, and an annular receiver coaxially aligned with the base and affixed to the distal ends of said legs for receiving the thrust chamber exit. The lifting platform rests on a seat concentrically related to the pedestal and affixed to an extended end portion thereof having a convex bearing surface mated in sliding engagement with the concave bearing surface of the annular base for accommodating a rocking motion of the platform.

  17. Energy recovery heat exchanger installation

    SciTech Connect

    Bradshaw, N.F.

    1983-08-16

    An installation is disclosed for energy recovery heat exchangers arranged to transfer heat into or out of air exhausted from an air handling system for paint spray booths. The system includes a collection chamber about which the intakes of a series of exhaust fans are arranged to draw exhaust air into an exhaust stack. Pairs of inclined wetted surface coil sets are mounted in the walls of the enclosures, each in communication with the intake of an exhaust fan so as to receive airflow of each exhaust fan. Each of the enclosures is provided with an access door to enable cleaning and other maintenance chores to be carried out on the coil sets and pivotally mounted blocking panels may be positioned to close off air flow across the coils and bypassing of the exhaust flow through the access doors in the event excessive overspray solids are present in the exhaust flow.

  18. Installing and maintaining gear pumps

    SciTech Connect

    Whitmire, K.

    1996-03-01

    While not as common as centrifugal pumps in the CPI, gear pumps play important roles in handling many of today`s more difficult-to-pump fluids. Because they operate at lower speeds -- generally, 900 rpm or less -- their seals and bearings tend to last longer than those of centrifugal models. In addition, unlike centrifugal pumps, gear pumps` flows are independent of their systems` pressure curves, and they can handle a wider range of viscosities. Although high-flow, low-head applications remain the domain of centrifugal pumps, the use of gear pumps is increasing in the chemical process industries (CPI). While some application boundaries between gears and centrifugals are blurring, there are some crucial differences between the way the two are operated and maintained -- for example, where pressure relief is concerned. This article provides a general summary of gear pump characteristics and applications, highlighting critical aspects of installation, operation and maintenance.

  19. Estudio de distintos modelos de protuberancias solares

    NASA Astrophysics Data System (ADS)

    Cirigliano, D.; Rovira, M.; Mauas, P.

    En este trabajo presentamos perfiles de líneas del CaII, MgII y HeI calculados para distintos modelos de protuberancias, y los comparamos con observaciones obtenidas por los satélites OSO 8 y SOHO. Para obtener las poblaciones de los distintos niveles de los átomos, utilizamos un código numérico que combina las ecuaciones de transporte de radiación y equilibrio estadístico en un único sistema de ecuaciones no lineal. Los modelos básicos que consideramos para las protuberancias consisten en placas homogéneas y unidimensionales apoyadas sobre la superficie del Sol. Dichas placas se hallan estratificadas en hebras y los modelos difieren entre sí en la temperatura y ancho de la placa, en la presión a la cual se halla el plasma y en el número de hebras. A partir de estos modelos se investiga cada uno de estos parámetros libres y como influyen en la atmósfera de las protuberancias solares y en el perfil de línea de cada especie estudiada, con el objetivo de determinar las condiciones en las que se halla el material atmosférico de estas protuberancias.

  20. Case Report: Silicatosis in a Carpet Installer

    PubMed Central

    Szeinuk, Jaime; Wilk-Rivard, Elizabeth J.

    2007-01-01

    Context Chronic exposure to talc in the course of carpet installation can result in pneumoconiosis. Case presentation We present a case of a young carpet installer who was diagnosed with silicatosis of the lung. Review of occupational history revealed that the patient had been working as a carpet installer for approximately 15 years, since he was 15 years of age. The patient was exposed to talc in the course of his work. Discussion Exposure to talc in the course of carpet installation has not been reported as a possible cause of pneumoconiosis. In this article we review different causes of silicatosis and discuss chronic exposure in the course of carpet installation and development of pneumoconiosis. In addition, we also review the relevance of mycobacterial infection in cases of silicosis and silicatosis. Relevance to Clinical or Professional Practice Exposure to talc in the course of carpet installation should be added to conditions that can cause pneumoconioses, specifically silicatosis of the lung. PMID:17589602

  1. DoD Installation Energy Security

    DTIC Science & Technology

    2012-05-24

    Opportunities  New revenue streams ● DoD Drivers  Economics  Energy security Smart MicroGrids 3 Military Installations and Energy Markets...58.8 MW Military Installations Often Do Not Look Like Commercial Facilities 5 DoD and Microgrids ● Must include an interconnected set of loads...grid and the local utility market Primary goal of DoD installation microgrids is to provide energy security in a cost effective manner. 6

  2. Installation package for air flat plate collector

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.

  3. A causa das estações do ano: modelos mentais

    NASA Astrophysics Data System (ADS)

    de Campos, J. A. S.; de Araujo, J. F. S.

    2003-08-01

    A década de 70 do século passado foi marcada pelo estudo das concepções alternativas que os alunos trazem para a sala de aula. A identificação destas concepções foi o ponto de partida para promover a mudança conceitual, onde as pré-concepções seriam trocadas pelas concepções científicas. Na década seguinte, surgiram muitas propostas de estratégias educacionais para facilitar esta troca, na sua maioria baseadas na idéia do conflito cognitivo, proposta por Piaget. Entretanto, os resultados pouco animadores conduziram à percepção de que a mudança conceitual é um processo mais complexo. Pelas idéias da Ciência Cognitiva, a mudança conceitual é uma mudança progressiva dos modelos mentais que o aluno tem sobre o mundo físico, através de enriquecimento e revisão. A causa das Estações do Ano é um tópico sobre o qual a maioria dos estudantes apresenta concepções alternativas. Os autores fizeram um levantamento sobre as pré-concepções encontradas em trabalhos sobre o tema (16 referências), procurando encontrar elementos comuns que indicassem a presença de modelos mentais específicos. As pré-concepções encontradas na literatura foram obtidas usando-se diversas metodologias (desde entrevistas clínicas até questionários de múltipla escolha) e envolvendo alunos e professores de diferentes regiões geográficas. A partir de uma análise aprofundada de cada trabalho, e utilizando-se a técnica das Redes Sistêmicas, chegou-se a conclusão que as diversas pré-concepções identificadas (em torno de 50), poderiam ser representadas por 6 modelos mentais, onde a explicação da causa das estações do ano tem um mecanismo causal responsável. Os mecanismos causais identificados foram: a dependência da distância, a dependência da orientação, a dependência conjunta da distância e orientação, a dependência da obstrução, a dependência da velocidade e a dependência da inclinação dos raios solares. Foram ainda identificadas

  4. Antispin-Tail-Parachute Installations

    NASA Technical Reports Server (NTRS)

    Seidman, Oscar; Kamm, Robert W.

    1943-01-01

    Although antispin tail parachutes have been used successfully in spin demonstrations for some time, very little published information is available concerning the size of parachute, the bridle-line length, and the type and location of pack to use for particular airplane. The present paper is an attempt to supply data relating to these factors. The paper is in two parts. The first part reviews the principles of operation of the antispin parachutes, views the principles of operation of the antispin parachutes, summarized available information on actual installations, and discusses parachute loads and pack locations. The second part of the paper reports on systematic tests in the NACA-15-foot and 20-foot free-spinning tunnels at the Langley memorial Aeronautical Laboratory to determine the minimum size and the optimum bridle-line lengths for antispin tail parachutes for current military airplanes. It is concluded that airplanes weighing between 7500 and 14,000 pounds require parachutes 8 feet in diameter and bridle-line lengths between 20 and 50 feet. A positive-ejection mechanism is desirable to throw the parachute clear of the tail and to assure rapid opening. The pack and attachment point must be so located that the equipment will not foul the tail surfaces.

  5. ALARA in European nuclear installations

    SciTech Connect

    Lefaure, C.; Croft, J.; Pfeffer, W.; Zeevaert, T.

    1995-03-01

    For over a decade the Commission of the European Community has sponsored research projects on the development and practical implementation of the Optimization principle, or as it is often referred to, ALARA. These projects have given rise to a series of successful international Optimization training courses and have provided a significant input to the periodic European Seminars on Optimization, the last one of which took place in April 1993. This paper reviews the approaches to Optimization that have development within Europe and describes the areas of work in the current project. The on-going CEC research project addresses the problem of ALARA and internal exposures, and tries to define procedures for ALARA implementation, taking account of the perception of the hazard as well as the levels of probability of exposure. The relationships between ALARA and work management, and ALARA and decommissioning of installations appear to be other fruitful research areas. Finally, this paper introduces some software for using ALARA decision aiding techniques and databases containing feed back experience developed in Europe.

  6. The International Space Station Urine Monitoring System (UMS)

    NASA Technical Reports Server (NTRS)

    Feeback, Daniel L.; Cibuzar, Branelle R.; Milstead, Jeffery R.; Pietrzyk,, Robert A.; Clark, Mark S.F.

    2009-01-01

    A device capable of making in-flight volume measurements of single void urine samples, the Urine Monitoring System (UMS), was developed and flown on seven U.S. Space Shuttle missions. This device provided volume data for each urine void from multiple crewmembers and allowed samples of each to be taken and returned to Earth for post-flight analysis. There were a number of design flaws in the original instrument including the presence of liquid carry-over producing invalid "actual" micturition volumes and cross-contamination between successive users from residual urine in "dead" spots". Additionally, high or low volume voids could not be accurately measured, the on-orbit calibration and nominal use sequence was time intensive, and the unit had to be returned and disassembled to retrieve the volume data. These problems have been resolved in a new version, the International Space Station (ISS) UMS, that has been designed to provide real-time in-flight volume data with accuracy and precision equivalent to measurements made on Earth and the ability to provide urine samples that are unadulterated by the device. Originally conceived to be interfaced with a U.S.-built Waste Collection System (WCS), the unit now has been modified to interface with the Russian-supplied Sanitary Hygiene Device (ASY). The ISS UMS provides significant advantages over the current method of collecting urine samples into Urine Collection Devices (UCDs), from which samples are removed and returned to Earth for analyses. A significant future advantage of the UMS is that it can provide an interface to analytical instrumentation that will allow real-time measurement of urine bioanalytes allowing monitoring of crewmember health status during flight and the ability to provide medical interventions based on the results of these measurements. Currently, the ISS UMS is scheduled to launch along with Node-3 on STS-130 (20A) in December 2009. UMS will be installed and scientific/functional verification

  7. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  8. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  9. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  10. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  11. 46 CFR 58.16-18 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a)...

  12. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  13. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  14. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 4 2011-07-01 2011-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  15. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 4 2012-07-01 2011-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  16. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 4 2013-07-01 2013-07-01 false Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  17. 32 CFR 637.3 - Installation Commander.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 4 2014-07-01 2013-07-01 true Installation Commander. 637.3 Section 637.3 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MILITARY POLICE INVESTIGATION Investigations § 637.3 Installation Commander. The...

  18. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  19. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  20. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  1. 46 CFR 119.220 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS MACHINERY INSTALLATION Propulsion... subchapter J (Electrical Engineering) of this chapter. (b) Installation of propulsion machinery of an unusual... requirements as determined necessary by the cognizant OCMI. Unusual types of propulsion machinery include:...

  2. 14 CFR 171.113 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... periodically. (f) The facility must have the following ground-air or landline communication services: (1) At... communications from the airport served by the facility. The utilization of voice on the SDF should be determined...

  3. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... supplemented by (depending on the circumstances) the following ground-air or landline communications services... ground-air communications from the airport served by the facility. Voice on the aid controlled from the...

  4. 14 CFR 171.9 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and the installation must meet at least the Federal Communication Commission's... following ground-air or landline communications services: (1) At facilities outside of and not immediately...

  5. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  6. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  7. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  8. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier...

  9. Science Officer Whitson installs SUBSA in MSG

    NASA Image and Video Library

    2002-07-05

    ISS005-E-06787 (5 July 2002) --- Astronaut Peggy A. Whitson, Expedition Five flight engineer, works near the Microgravity Science Glovebox (MSG) in the Destiny laboratory on the International Space Station (ISS). Whitson spent much of the morning installing the Solidification Using a Baffle in Sealed Ampoules (SUBSA) experiment in the MSG. The SUBSA installation will be completed once the MSG is activated.

  10. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 5 2011-10-01 2011-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  11. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  12. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 5 2013-10-01 2013-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  13. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 5 2012-10-01 2012-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  14. 49 CFR 393.30 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 5 2014-10-01 2014-10-01 false Battery installation. 393.30 Section 393.30... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation. Every storage battery on every vehicle, unless located in the engine compartment, shall be covered by...

  15. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  16. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.209 Section 171.209 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES VHF Marker Beacons § 171.209 Installation...

  17. Financial Institutions on DoD Installations

    DTIC Science & Technology

    1989-07-26

    Instructions 1000.10 and 1000.12 (references (b) and (c)). 5 4. Military disbursing offices, nonappropriated fund instrumentalities , and other DoD installation...offices, Agencies, and Departments performing functions on a DoD installation (including nonappropriated fund instrumentalities ); and their

  18. MSFC inspections of installed polyimide wire

    NASA Technical Reports Server (NTRS)

    Landers, Joe C.

    1994-01-01

    An alert was issued because of the arc-tracking possibilities of installed polyimide wire harnesses. MSFC undertook a program to try to enhance the safety and reliability of these harnesses. Photographs are presented showing the need for inspections of installed wiring harnesses.

  19. 46 CFR 111.33-5 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...

  20. Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed

    DTIC Science & Technology

    2015-09-01

    FINAL REPORT Demonstrate Energy Component of the Installation Master Plan Using Net Zero Installation Virtual Testbed ESTCP Project EW...ERDC-CERL, a definition of a “net zero energy installation” was proposed based on current realities at Army installations: The amount of fossil

  1. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    SciTech Connect

    Richards, Elizabeth H.; Schindel, Kay; Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William; Harper, Alan

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  2. Vehicle Support Posts Installation at Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  3. Debarment: A Guide for Installation Commanders

    DTIC Science & Technology

    2001-04-01

    U.S. v. May, et. al., 622 F.2d 1000 (1980), for the proposition that commanders —bar“ individuals from base, but see, Flower v. United States, 407 U.S...installations by order of the installation commander. In Flower v. United States,30 the Supreme Court began to clarify it‘s holding in McElroy, and...articulate the parameters within which an installation commander can operate in protecting assets and people under his command. In Flower , the Supreme

  4. FORCAST Camera Installed on SOFIA Telescope

    NASA Image and Video Library

    Cornell University's Faint Object Infrared Camera for the SOFIA Telescope, or FORCAST, being installed on the Stratospheric Observatory for Infrared Astronomy's 2.5-meter telescope in preparation f...

  5. Plazmennyi-Kristall-3 plus hardware installation

    NASA Image and Video Library

    2010-06-30

    ISS024-E-007108 (30 June 2010) --- Russian cosmonaut Alexander Skvortsov, Expedition 24 commander, installs hardware for the new Plasma Crystal-3 Plus experiment in the Poisk Mini-Research Module 2 (MRM2) of the International Space Station.

  6. Space Station Live: Installing the AMS

    NASA Image and Video Library

    PAO Officer Kyle Herring interviews NASA astronaut Mike Fincke about his contribution during STS-134, the shuttle mission that installed the Alpha Magnetic Spectrometer (AMS) in May 2011. As a miss...

  7. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  8. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be...

  9. Concentrating solar collector-installation package

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Report contains general description of concentrating solar collector and tracking system kit, along with comprehensive drawings, instructions, and guidelines to assist in field assembly, installation, operation, and maintenance of system.

  10. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., unless the CFO determines that a longer period is required. Installment payments of less than $50 per... interest of the United States, paying special attention to applicable statutes of limitations....

  11. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... determines that a longer period is required. Installment payments of less than $50 per month generally will... accordance with the best interest of the United States, paying special attention to applicable statutes...

  12. Preparing to Install APXS Sensor Head

    NASA Image and Video Library

    2009-10-13

    Grad student Nicholas Boyd left and Principal Investigator Ralf Gellert, both of the University of Guelph, Ontario, Canada, prepare for the installation of the Alpha Particle X-ray Spectrometer sensor head during testing at NASA JPL.

  13. AERODYNAMICS OF POWER PLANT INSTALLATION, PART II.

    DTIC Science & Technology

    schemes on V/STOL aircraft at forward speeds; Lift-fan V/STOL propulsion and airframe integration; NASA research on the aerodynamics of jet VTOL engine installations; Experimental studies of VTOL fan-in-wing inlets.

  14. EPA RE-Powering Mapper Completed Installations

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.

  15. Hydrogen isotope separation installation for tritium facility

    SciTech Connect

    Andreev, B.M.; Perevezentsev, A.N.; Selivanenko, I.L.; Tenyaev, B.N.; Vedeneev, A.I.; Golubkov, A.N.

    1995-10-01

    The separation of hydrogen isotopes in the hydrogen-palladium system in sectioned separation columns with the simulation of counter-current isotopic exchange is described. The separation efficiency of sectioned columns is investigated with the experimental installation as a function of various parameters. The separation of deuterium-tritium mixtures with high tritium concentrations is tested with the pilot installation operating at room temperature and atmospheric hydrogen pressure. Due to very high separation efficiency, flexibility and simplicity of operation separation installations with sectioned columns are ideally suitable for tritium laboratories and facilities dealing with separation of hydrogen isotopes. Estimation of applicability of sectioned columns for regeneration of exhaust gas in a fuel cycle of thermonuclear reactors, such as JET and ITER, shows the number of advantages of separation installations with sectioned columns. 12 refs., 3 figs., 2 tabs.

  16. Installing Portable Classrooms With Good Air Quality.

    ERIC Educational Resources Information Center

    Godfrey, Ray

    2000-01-01

    Discusses the advantages of modular classrooms and improvements made in indoor air quality, including the pros and cons of portables, challenges districts face when planning and installing portables, and cost considerations. Concluding comments highlight system costs and maintenance required. (GR)

  17. Structural Code Considerations for Solar Rooftop Installations.

    SciTech Connect

    Dwyer, Stephen F.; Dwyer, Brian P.; Sanchez, Alfred

    2014-12-01

    Residential rooftop solar panel installations are limited in part by the high cost of structural related code requirements for field installation. Permitting solar installations is difficult because there is a belief among residential permitting authorities that typical residential rooftops may be structurally inadequate to support the additional load associated with a photovoltaic (PV) solar installation. Typical engineering methods utilized to calculate stresses on a roof structure involve simplifying assumptions that render a complex non-linear structure to a basic determinate beam. This method of analysis neglects the composite action of the entire roof structure, yielding a conservative analysis based on a rafter or top chord of a truss. Consequently, the analysis can result in an overly conservative structural analysis. A literature review was conducted to gain a better understanding of the conservative nature of the regulations and codes governing residential construction and the associated structural system calculations.

  18. Installing SAM Instrument into Curiosity Mars Rover

    NASA Image and Video Library

    2011-01-18

    In this photograph, technicians and engineers inside a clean room at NASA Jet Propulsion Laboratory, Pasadena, Calif., position NASA Sample Analysis at Mars SAM above the mission Mars rover, Curiosity, for installing the instrument.

  19. Methods for protecting subsea pipelines and installations

    SciTech Connect

    Rochelle, W.R.; Simpson, D.M.

    1981-01-01

    The hazards for subsea pipelines and installations are described. Methods currently being used to protect subsea pipelines and installations are discussed with the emphasis on various trenching methods and equipment. Technical data on progress rates for trenching and feasible depths of trench are given. Possible methods for protection against icebergs are discussed. A case for more comprehensive data on icebergs is presented. Should a pipeline become damaged, repair methods are noted.

  20. Solar system installation at Louisville, Kentucky

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  1. Cathodic protection installation for underground storage tanks

    SciTech Connect

    Koszewski, L.

    1995-12-31

    The 1998 deadline is fast approaching for upgrading Underground Storage Tanks (USTs) with cathodic protection. With so many tanks requiring upgrades over the next few years, tank owners and operators will likely find a shrinking pool of quality cathodic protection installation contractors to perform the necessary upgrading. The proper installation of cathodic protection components is critical to long term effective operation of the cathodic protection system.

  2. Improving Energy Security for Air Force Installations

    NASA Astrophysics Data System (ADS)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  3. Extending Installation Sustainability Beyond the Fenceline

    DTIC Science & Technology

    2010-06-01

    Office of the Assistant Secretary of the Army (Installations and Environment) DoD Executive Agent Extending Installation Sustainability Beyond...Technology Transition – Supporting DoD Readiness, Sustainability , and the Warfighter Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...if it does not display a currently valid OMB control number. 1. REPORT DATE JUN 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010

  4. Water Sustainability Assessment for Ten Army Installations

    DTIC Science & Technology

    2011-03-26

    Limiting water conservation to the requirements of EO 13514 encou- rages installations to reach for the low hanging fruit . Technologies that have...ER D C/ CE RL T R- 11 -5 Water Sustainability Assessment for Ten Army Installations Co ns tr uc tio n En gi ne er in g R es...March 2011 Approved for public release; distribution is unlimited. ERDC/CERL TR-11-5 March 2011 Water Sustainability Assessment

  5. Nacap installs Norway's first land lines

    SciTech Connect

    Not Available

    1984-08-01

    Norway's first gas pipeline on land - forming a part of the Statpipe gas gathering, transportation, and treatment system - is currently being installed by Nacap BV under extremely unusual conditions, both in terms of terrain to be crossed and safety standards to be adhered to. Nacap is constructing the 12 mile long twin pipeline of 30 in. and 28 in. diameters, two-thirds of which run under three deep fjords. Special construction techniques used for installing the pipeline are described.

  6. Software Management Environment (SME) installation guide

    NASA Technical Reports Server (NTRS)

    Kistler, David; Jeletic, Kellyann

    1992-01-01

    This document contains installation information for the Software Management Environment (SME), developed for the Systems Development Branch (Code 552) of the Flight Dynamics Division of Goddard Space Flight Center (GSFC). The SME provides an integrated set of management tools that can be used by software development managers in their day-to-day management and planning activities. This document provides a list of hardware and software requirements as well as detailed installation instructions and trouble-shooting information.

  7. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Installation and details. 32.45-1 Section...

  8. 46 CFR 32.45-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS Electrical Installations § 32.45-1 Installation and details. The installation of all electrical... installation, must meet the requirements of subchapter J (Electrical Engineering Regulations) of this chapter. ... 46 Shipping 1 2011-10-01 2011-10-01 false Installation and details. 32.45-1 Section...

  9. A novel design procedure for jacket installations

    SciTech Connect

    Christiansen, P.E.; Sterndorff, M.J.

    1995-12-31

    In the summer of 1994 the jacket and topsides for Total Oil Marine`s Dunbar field in the UK sector of the North Sea were successfully installed by Heeremac`s heavy lift barge DB102. The jacket was lifted off the transportation barge, upended from horizontal to vertical using a crane assisted ballasting procedure, and then installed in two steps over four pre-installed under-leg piles. The installation of the jacket was challenging since the life was utilizing the full crane capacity and also due to the soil conditions at the location, which made the docking procedure critical to achieve the required installation tolerances for tie-back of the pre-drilled wells. The SSCV assisted installation procedure was carefully deigned and analyzed by numerical calculations supplemented and supported by extensive physical model testing. This paper addresses the model test methodology with emphasis on the innovative procedures for testing and analyzing random, non-linear phenomena: impact loads during jacket lift-off from the barge and between jacket and piles during docking. The test program and the analysis demonstrated the importance of providing not just a single value but a sample of extreme values for a proper assessment of design loads that are generated by non-linear random processes. Whereas the results from the tests are specific for the jacket structure, the methodology is of general use for the industry.

  10. 40 CFR 92.511 - Remanufactured locomotives: installation audit requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... locomotives: installation audit requirements. (a) Remanufacturers of locomotives or locomotive engines shall...: installation audit requirements. 92.511 Section 92.511 Protection of Environment ENVIRONMENTAL PROTECTION..., component settings and component installations on randomly chosen locomotives in an engine family....

  11. Development of a coiled tubing cable installation system

    SciTech Connect

    Newman, K.R.; Haver, N.A.; Stone, L.R.

    1995-12-31

    A system has been developed which installs and de-installs an electric wireline cable in coiled tubing (CT) while the CT is still on the reel. This cable installation system reduces the cost of a cable installation significantly compared with previous installation methods. This paper discusses the need for such a system, the theory used to develop this system, the various concepts considered, the system that was developed and test installation cases.

  12. Transferências orbitais dentro do modelo quase bicircular no sistema Terra-Lua-Sol

    NASA Astrophysics Data System (ADS)

    Corrêa, A. A.; de Almeida Prado, A. F. B.; Stuchi, T. J.; Beaugé, C.

    2003-08-01

    O problema quase bicircular planar consiste na determinação da dinâmica de um corpo, de massa desprezível, que se move sob o campo gravitacional de três corpos. No caso estudado, o quarto corpo é considerado um satélite artificial e os demais são a Terra, a Lua e o Sol, formando o sistema de três corpos. Este modelo permite a construção de uma hamiltoniana similar a do problema restrito de três corpos (PRTC), incluindo termos periódicos não autônomos, provenientes da presença do Sol, portanto pode ser entendido como uma perturbação ao PRTC. Suas órbitas periódicas aparecem isoladas e possuem o mesmo período solar. Os pontos de equilíbrio colineares possuem o mesmo caráter de estabilidade linear dos pontos lagrangianos (L1, L2 e L3) do PRTC, sendo do tipo sela x centro x centro, instável na direção x e estáveis nas direções y e z. As órbitas periódicas tridimensionais ao redor do ponto colinear é chamada órbita Halo. O objetivo deste trabalho é determinar órbitas de transferências de baixo consumo de combustível para um veículo espacial partindo de uma órbita de estacionamento ao redor da Terra em direção a uma órbita Halo do ponto L1, situado entre a Terra e Lua. Esta tarefa pode ser transformada no problema de valor de contorno: dado um ponto inicial na órbita de estacionamento, um ponto final na órbita halo e o tempo de transferência, deseja-se obter a trajetória que liga estes dois pontos e que minimize os incrementos de velocidade do veículo. Essas transferências são realizadas baseadas no método de Lambert e analisadas de modo a fornecer um baixo consumo. Posteriormente, é feita uma comparação de consumo com as órbitas de transferência equivalentes do PRTC.

  13. VERA 3.5 Installation Guide

    SciTech Connect

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  14. Study on installation of the submersible mixer

    NASA Astrophysics Data System (ADS)

    Tian, F.; Shi, W. D.; He, X. H.; Jiang, H.; Xu, Y. H.

    2013-12-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice.

  15. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  16. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare to install a vehicle support post. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  17. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    In view are three vehicle support posts installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  18. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    A construction worker on the deck of the mobile launcher welds a portion of a platform for installation of a vehicle support post at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  19. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare a platform for installation of a vehicle support post. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  20. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  1. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  2. Fluid assisted installation of electrical cable accessories

    DOEpatents

    Mayer, Robert W.; Silva, Frank A.

    1977-01-01

    An electrical cable accessory includes a generally tubular member of elastomeric material which is to be installed by placement over a cylindrical surface to grip the cylindrical surface, when in appropriate assembled relation therewith, with a predetermined gripping force established by dilation of the tubular member, the installation being facilitated by introducing fluid under pressure, through means provided in the tubular member, between the tubular member and the cylindrical surface, and simultaneously impeding the escape of the fluid under pressure from between the tubular member and the cylindrical surface by means adjacent one of the ends of the tubular member to cause dilation of the tubular member and establish a fluid layer between the tubular member and the cylindrical surface, thereby reducing the gripping force during installation.

  3. Risk assessment Barter Island radar installation, Alaska

    SciTech Connect

    1995-05-05

    This document contains the baseline human health risk assessment and the ecological risk assessment (ERA) for the Barter Island Distant Early Warning (DEW) Line radar installation. Fourteen sites at the Barter Island radar installation underwent remedial investigations (RIS) during the summer of 1993. The presence of chemical contamination in the soil, sediments, and surface water at the installation was evaluated and reported in the Barter Island Remedial Investigation/Feasibility Study (RI/FS) United States Air Force 1994a. The analytical data reported in the RI/FS form the basis for the human health and ecological risk assessment. The primary contaminants of concern at the 14 sites are diesel and gasoline from past spills and/or leaks. The general location of the Barter Island radar installation is shown in Figure 1-1. The 14 sites investigated and the types of samples collected at each site are presented in Table 1-1. The purpose of the risk assessment is to evaluate the human and ecological health risks that may be associated with chemicals released to the environment at the 14 sites investigated during the RIs. The risk assessment characterizes the probability that measured concentrations of hazardous chemical substances will cause adverse effects in humans or the environment in the absence of remediation. The risk assessment will be used to determine if remediation (site cleanup) is necessary and also to rank sites for remedial action. Additionally, it will be used as a model for the risk assessment to be performed at the other DEW Line installations (Bullen Point, Oliktok Point, Point Lonely, Barrow Point, Wainwright, and Point Lay) and the Cape Lisburne radar installation. pg18. JMD.

  4. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cove, Columbia, SC

    SciTech Connect

    Not Available

    1980-09-01

    Information is presented concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water. Included are such items as principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system. Also included are trouble-shooting charts and maintenance schedules.

  5. PUREX exhaust ventilation system installation test report

    SciTech Connect

    Blackaby, W.B.

    1997-10-07

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment.

  6. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  7. Inflatable device for installing strain gage bridges

    NASA Technical Reports Server (NTRS)

    Cook, C. E.; Smith, G. E.; Monaghan, R. C. (Inventor)

    1983-01-01

    Methods and devices for installing in a tubular shaft multiple strain gages are disclosed with focus on a method and a device for pneumatically forcing strain gages into seated engagement with the internal surfaces of a tubular shaft in an installation of multiple strain gages in a tubular shaft. The strain gages or other electron devices are seated in a template-like component which is wrapped about a pneumatically expansible body. The component is inserted into a shaft and the body is pneumatically expanded after a suitable adhesive was applied to the surfaces.

  8. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians install thermal blankets around the area where several Nanoracks will be installed on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  9. Mars Reconnaissance Orbiter After Camera Installation

    NASA Image and Video Library

    2005-01-07

    A telescopic camera called the High Resolution Imaging Science Experiment, or HiRISE, was installed onto the main structure of NASA Mars Reconnaissance Orbiter on Dec. 11, 2004 at Lockheed Martin Space Systems, Denver, Colo. HiRISE is at the top of the spacecraft in this image. Some other large components, including solar panels and the high-gain antenna, had not yet been installed. The orbiter is scheduled for launch in August 2005 carrying six science instruments. Ball Aerospace and Technology Corp., Boulder, Colo., built HiRISE for the University of Arizona, Tucson, to supply for the mission. http://photojournal.jpl.nasa.gov/catalog/PIA07210

  10. Installment sales: How they relate to timberland

    Treesearch

    William C. Siegel

    2004-01-01

    If certain conditions are met, the gain recognized on the sale of real property-such as forest land and/or standing timber-can be spread over more than one year for income tax purposes. Such sales are referred to as "installment" or "deferred payment" contracts. An outright sale, on the other hand, triggers immediate recognition of all gain in the...

  11. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) § 171.159...

  12. Public Address Systems. Specifications - Installation - Operation.

    ERIC Educational Resources Information Center

    Palmer, Fred M.

    Provisions for public address in new construction of campus buildings (specifications, installations, and operation of public address systems), are discussed in non-technical terms. Consideration is given to microphones, amplifiers, loudspeakers and the placement and operation of various different combinations. (FS)

  13. MS Kavandi installs cables in Quest airlock

    NASA Image and Video Library

    2001-07-16

    S104-E-5104 (16 July 2001) --- Janet L. Kavandi, STS-104 mission specialist, connects cables and hoses from the newly installed Quest Airlock to Unity Node 1. Other STS-104 and Expedition Two crewmembers are visible in the background working in the Airlock.

  14. 14 CFR 171.159 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Installation requirements. 171.159 Section 171.159 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Distance Measuring Equipment (DME) §...

  15. 14 CFR 171.209 - Installation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... requirements. (a) The facility must be installed according to accepted good engineering practices, applicable electric and safety codes, and Federal Communications Commission requirements. (b) The facility must have a... communications or reliable communications (at least a landline telephone) from the airport to the nearest Federal...

  16. 14 CFR 171.271 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.271 Section 171.271 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS...

  17. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  18. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  19. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  20. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  1. 30 CFR 817.180 - Utility installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and...

  2. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  3. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  4. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  5. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  6. 14 CFR 23.901 - Installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... exceed those established during the type certification of the engine. (2) Ensure that the capability of... installation must comply with— (1) The instructions provided under the engine type certificate and the... maintenance. (c) Engine cowls and nacelles must be easily removable or openable by the pilot to provide...

  7. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  8. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  9. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  10. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  11. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  12. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  13. 22 CFR 213.19 - Installment payments.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... payments will bear a reasonable relation to the size of the debt and the debtor's ability to pay. The... payments. (a) Whenever feasible, and except as otherwise provided by law, debts owed to the United States... States, the CFO may approve repayment of the debt in installments. The debtor has the burden...

  14. 40 CFR 13.18 - Installment payments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reasonable relation to the size of the debt and the debtor's ability to pay. The installment payments will be..., debts owed to the United States, together with interest, penalty and administrative costs, as required... mechanism is in the best interest of the United States, the Administrator may approve repayment of the...

  15. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  16. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  17. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  18. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  19. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  20. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  1. 46 CFR 119.310 - Installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Machinery § 119.310 Installations. (a) Auxiliary machinery of the internal combustion piston type must comply with the provisions of this part. (b) Auxiliary machinery of the steam or gas turbine type will be... Engineering) of this chapter as determined necessary by the cognizant OCMI. (c) Auxiliary boilers and heating...

  2. 5 CFR 831.1807 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Installment withholdings. 831.1807 Section 831.1807 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) RETIREMENT Agency Requests to OPM for Recovery of a Debt from the Civil...

  3. 5 CFR 845.407 - Installment withholdings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 845.407 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL EMPLOYEES RETIREMENT SYSTEM-DEBT COLLECTION Agency Requests to OPM for Recovery of a Debt From the Civil Service Retirement Fund § 845.407 Installment withholdings. (a) When possible, OPM...

  4. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  5. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  6. Standard hydrogen monitoring system equipment installation instructions

    SciTech Connect

    Schneider, T.C.

    1996-09-27

    This document provides the technical specifications for the equipment fabrication, installation, and sitework construction for the Standard Hydrogen Monitoring System. The Standard Hydrogen Monitoring System is designed to remove gases from waste tank vapor space and exhaust headers for continual monitoring and remote sample analysis.

  7. Solar Energy Installers Curriculum Guides. Final Report.

    ERIC Educational Resources Information Center

    Walker, Gene C.

    A project was conducted to develop solar energy installers curriculum guides for use in high school vocational centers and community colleges. Project activities included researching job competencies for the heating, ventilation, and air conditioning industry and determining through interviews and manufacturers' literature what additional…

  8. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007213 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  9. installing the new T61p laptop

    NASA Image and Video Library

    2011-09-21

    ISS029-E-007212 (21 Sept. 2011) --- Japan Aerospace Exploration Agency astronaut Satoshi Furukawa, Expedition 29 flight engineer, installs a new T61p laptop to replace the previous A31p as OCA Router in the Joint Station LAN/Local Area Network (JSL LAN). The laptop is located in the hatch area of the Destiny laboratory of the International Space Station.

  10. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  11. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  12. 14 CFR 23.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 23.655 Section 23.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... stabilizer is used, it must have stops that will limit its range of travel to that allowing safe flight...

  13. 14 CFR 25.655 - Installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Installation. 25.655 Section 25.655 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS... adjustable stabilizer is used, it must have stops that will limit its range of travel to the maximum...

  14. Planning, Developing and Installing a Campus LAN.

    ERIC Educational Resources Information Center

    Foley, Francis

    Berry College (Georgia) installed a new library computer and operating system, connected five buildings via a campus local area network (LAN), added eight faculty/staff offices to the LAN, completed an Internet connection, and has a name server operating. The college has also established e-mail and limited campus accounts for 300 of its 2,000…

  15. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities § 171.29...

  16. 14 CFR 171.29 - Installation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Installation requirements. 171.29 Section 171.29 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Nondirectional Radio Beacon Facilities § 171.29...

  17. A Principal's Guide to ILS Facilities Installation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.

    1992-01-01

    Outlines five facilities considerations that school principals need to address prior to the installation of an integrated learning system (ILS): (1) placement, i.e., labs or classrooms; (2) wiring; (3) environment, including furniture and noise; (4) security, including fire, theft, vandalism, and misuse; and (5) usability, including afterschool…

  18. Door Hardware and Installations; Carpentry: 901894.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in the selection, preparation, and installation of hardware for door assemblies. The course is divided into five blocks of instruction (introduction to doors and hardware, door hardware, exterior doors and jambs, interior doors and jambs, and a quinmester post-test) totaling…

  19. OSM's cone design and installation experience

    SciTech Connect

    Van Dyke, M.W.

    1983-06-29

    The concrete filled steel cone offers an alternative solution in sealing vertical mine shafts. This paper gives the design and installation experiences of the Office of Surface Mining when dealing with abandoned coal mines. This same solution can also be used with other types of shaft closures. 4 figures.

  20. Electron circuits: Semiconductor laser multiple use installation

    NASA Astrophysics Data System (ADS)

    Zhou, F.; Fan, J.; Weng, D.

    1983-04-01

    A light source for a multiple use installation using a same matter junction or different matter junction GaAlAs/GaAs semiconductor laser, which has the advantages of high interference resistance, long transmission distance (tens to hundreds of meters), good security, and low power consumption; in addition, the controller of the light source has multiple usages of alarming, switching and counting is presented. The multiple use installation can be used in control of breaking warps and counting on roving waste machines, warping machines and silk weaving machines in the textile industry; long distance speed measurement, alarming and counting in machinery, electricity and chemical industries; and alarming and control of water levels in reservoirs, rivers and water towers, as well as blockade alarming and control of important divisions. This multiple use installation is composed of two parts a laser emitter and a receiving device. The former component is used to produce the laser; after the receiver receives the laser, the installation completes operations of alarming, switching and counting.

  1. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  2. 24 CFR 3286.405 - Installation suitability.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... foundation or support and stabilization system that is to be used to install the home in accordance with the... plate required by § 3280.5 of this chapter is affixed to the home, that the home is designed for the roof load, wind load, and thermal zones that are applicable to the intended site; and (4)...

  3. D0 Cryo CC Heater Installation

    SciTech Connect

    Urbin, J.; /Fermilab

    1991-03-16

    Nine pairs of heaters are installed in the bottom of the CC pressure vessel.The physical layout is shown in the CC internal development drawing, D0 dwg. 3740.510-ME-255523. Electrically the heater system is a delta configuration. Electrical details are found on D0 dwg. 3740.515EC-273761. The feedthrough connectors for power to the heaters are located in the instrumentation box. Connector positions are found on D0 dwg.3740.515-EC-273760. Original sketches for the above named drawings are included in this document. The heaters and wiring were cleaned various times prior to and after installation with ethyl a1chohol. At various stages in the installation hi-pot and continuity tests were successfully accomplished to verify the integrity of the system. The fmal hi-pot numbers are included in the documentation. The heaters and wiring are kept separated from thermometry and purity cell wiring by SS sheetmetal barriers. The fabrication, testing and installation was completed by M. Hentges and his crew from AD/Cryo.

  4. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  5. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  6. 46 CFR 129.200 - Design, installation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Design, installation, and maintenance. 129.200 Section... ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed, installed, and maintained to— (a) Provide services necessary for...

  7. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... installations of new manufactured homes in a state without a qualifying installation program must itself have..., or other sales or storage lots, when the manufactured home is not serving as an occupied residence... HOUSING AND URBAN DEVELOPMENT MANUFACTURED HOME INSTALLATION PROGRAM Installer Licensing in HUD...

  8. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the aircraft must: (1) Be of a kind and design appropriate to its intended function. (2) Be installed according...

  9. 40 CFR 1036.130 - Installation instructions for vehicle manufacturers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards and Related Requirements § 1036.130 Installation instructions for vehicle manufacturers. (a) If... vehicle, as described in 40 CFR 1068.105.” (c) You do not need installation instructions for engines that... ensure that each installer is informed of the installation requirements....

  10. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  11. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  12. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  13. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 2 2012-10-01 2012-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  14. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  15. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 2 2014-10-01 2014-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  16. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  17. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 2 2011-10-01 2011-10-01 false Gasoline engine installations. 58.10-5 Section 58.10-5... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended...

  18. 26 CFR 1.6655-3 - Adjusted seasonal installment method.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... rule of section 6655(b) ($250,000 paid in each of the first and second installments less this paragraph... applied towards the first and second installments under the general rule of section 6655(b) ($250,000 paid... installment less amount applied towards the first, second, and third installments under the general rule of...

  19. 26 CFR 1.6655-3 - Adjusted seasonal installment method.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... rule of section 6655(b) ($250,000 paid in each of the first and second installments less this paragraph... applied towards the first and second installments under the general rule of section 6655(b) ($250,000 paid... installment less amount applied towards the first, second, and third installments under the general rule of...

  20. 46 CFR 58.10-5 - Gasoline engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... 46 Shipping 2 2013-10-01 2013-10-01 false Gasoline engine installations. 58.10-5 Section...

  1. 46 CFR 58.10-10 - Diesel engine installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section...

  2. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  3. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  4. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  5. 46 CFR 111.15-5 - Battery installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Battery installation. 111.15-5 Section 111.15-5 Shipping... REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-5 Battery installation. (a) Large batteries. Each large battery installation must be in a room that is only for batteries...

  6. Um Infixation and Prefixation in Toba Batak.

    ERIC Educational Resources Information Center

    Crowhurst, Megan J.

    1998-01-01

    Examines the behavior of the morpheme, um, in Toba Batak and Tagalog, which alternates as a prefix or an infix, arguing that the variation is conditioned by constraints on consonant clusters. Three patterns of variation that occur with um are described, noting that the stages involved in changing from infixed to prefixed positions over time are…

  7. UIUC control console installation and upgrade

    SciTech Connect

    Holm, Richard L.

    1994-07-01

    The University of Illinois Nuclear Reactor Laboratory shutdown in March of 1993 to install the General Atomics digital control console. Two weeks of this period were devoted to refurbishment of the rod drives and two weeks were the actual installation of the console. Much of the wiring necessary to install the console was done during the period when the rod drives were being refurbished. A few mistakes were made along the way. 1) A 'repaired' extension cord was temporarily used to supply power to the DAC... the ground and neutral were reversed... this was not appreciated by the DAC{exclamation_point} We had to replace a couple of the boards in the DAC after that little fiasco. 2) The instrumentation cables for the rod drives were received with the plugs all connected and ready to install... except you can't put a two inch plug through a half inch conduit. We had to cut the plugs off, run the cable through the conduit, and then resolder the plugs on where the rod drive assembly connects (my privilege). 3) We had to replace the memory board in the NM1000 in order to prevent it from losing its mind every time it got turned off. 4) There were problems with the pulse data acquisition that were eventually traced to a problem in the ribbon cable between the mother and daughter boards. All in all the installation and operation of the console went fairly well. There are still occasional glitches, but none serious or excessively annoying. The console installation is part of an upgrade program to replace all of the instrumentation in the facility with the modern equivalent. The pressure and flow sensors, currently air operated, are being replaced with 4-20 ma transmitters for input into the control console and into a mimic board for the primary and secondary systems. Through the funding of the now defunct, temporarily we hope, Reactor Instrumentation Program we have upgraded our area radiation monitors as well. These upgrades provide us with more reliable equipment as well as

  8. Smoke Alarm Giveaway and Installation Programs

    PubMed Central

    Liu, Ying; Mack, Karin A.; Diekman, Shane T.

    2015-01-01

    Background The burden of residential fire injury and death is substantial. Targeted smoke alarm giveaway and installation programs are popular interventions used to reduce residential fire mortality and morbidity. Purpose To evaluate the cost effectiveness and cost benefit of implementing a giveaway or installation program in a small hypothetic community with a high risk of fire death and injury through a decision-analysis model. Methods Model inputs included program costs; program effectiveness (life-years and quality-adjusted life-years saved); and monetized program benefits (medical cost, productivity, property loss and quality-of-life losses averted) and were identified through structured reviews of existing literature (done in 2011) and supplemented by expert opinion. Future costs and effectiveness were discounted at a rate of 3% per year. All costs were expressed in 2011 U.S. dollars. Results Cost-effectiveness analysis (CEA) resulted in anaverage cost-effectiveness ratio (ACER) of $51,404 per quality-adjusted life-years (QALYs) saved and $45,630 per QALY for the giveaway and installation programs, respectively. Cost–benefit analysis (CBA) showed that both programs were associated with a positive net benefit with a benefit–cost ratio of 2.1 and 2.3, respectively. Smoke alarm functional rate, baseline prevalence of functional alarms, and baseline home fire death rate were among the most influential factors for the CEA and CBA results. Conclusions Both giveaway and installation programs have an average cost-effectiveness ratio similar to or lower than the median cost-effectiveness ratio reported for other interventionsto reduce fatal injuries in homes. Although more effort is required, installation programs result in lower cost per outcome achieved compared with giveaways. PMID:22992356

  9. Static Frequency Converter System Installed and Tested

    NASA Technical Reports Server (NTRS)

    Brown, Donald P.; Sadhukhan, Debashis

    2003-01-01

    A new Static Frequency Converter (SFC) system has been installed and tested at the NASA Glenn Research Center s Central Air Equipment Building to provide consistent, reduced motor start times and improved reliability for the building s 14 large exhausters and compressors. The operational start times have been consistent around 2 min, 20 s per machine. This is at least a 3-min improvement (per machine) over the old variable-frequency motor generator sets. The SFC was designed and built by Asea Brown Boveri (ABB) and installed by Encompass Design Group (EDG) as part of a Construction of Facilities project managed by Glenn (Robert Scheidegger, project manager). The authors designed the Central Process Distributed Control Systems interface and control between the programmable logic controller, solid-state exciter, and switchgear, which was constructed by Gilcrest Electric.

  10. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    A vehicle support post will lifted up by crane and lowered onto the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  11. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  12. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane lifts the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  13. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  14. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  15. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    Construction workers assist as a crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  16. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    Seeming to hang in midair, the Orion Service Module Umbilical (OSMU) is lifted high up by crane for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  17. Portable off shore well installation apparatus

    SciTech Connect

    Grace, F.J.

    1983-02-15

    A portable off shore well installation apparatus, particularly for off shore wells, utilizing a pollution control curtain surrounding drilling equipment between the surface of the water and a well head, such curtain comprising a submerged anchor ring having secured to the top thereof an axially extendable water impermeable sleeve secured at its lower end to the top of the submerged anchor ring, a float ring secured to the upper end of the extendable sleeve, a plurality of longitudinally spaced buoyant rings attached at suitable intervals about the periphery of the sleeve to provide uniform axial extension of the sleeve, and a fillable retriever ring secured to the lower portion of the anchor ring to facilitate installation and removal of the curtain from the well site when the retriever ring is filled with a buoyant substance.

  18. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Employees at NASA's John C. Stennis Space Center complete installation of the new thrust measurement system on the A-1 Test Stand. The new TMS is a state-of-the-art upgrade from the previous system, which was installed when the testing structure was built in the 1960s. It is an advanced calibration system capable of measuring vertical and horizontal thrust loads with accuracy within 0.15 percent at 225,000 pounds. It also will allow engineers to measure thrust as they gimbal (or tilt) engines during tests. The new TMS is part of upgrades for the A-1 Test Stand in preparation for testing the next generation of American space program rocket engines.

  19. Installation of a Roof Mounted Photovoltaic System

    NASA Astrophysics Data System (ADS)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  20. Usachev and Helms install SSRMS cables

    NASA Image and Video Library

    2001-03-30

    ISS002E5480 (30 March 2001) --- Cosmonaut Yury V. Usachev (foreground), Expedition Two mission commander, and astronaut Susan J. Helms, Expedition Two flight engineer, install cables for the Space Station Remote Manipulator System (SSRMS) or Canadarm2 control panel in preparation for the delivery of the Canadarm2 by the STS-100 crew in April. This image was recorded with a digital still camera.

  1. Improving Installation Level Classified Information Protection Programs.

    DTIC Science & Technology

    1987-04-01

    1987 Api ni 16. SUPPLEMENTARY NOTATION ITEM 11: CLASSIFIED INFORMATION PROTECTION-PROGRAMS 17. COSATI CODES 18. SUBJECT TERMS ( Continue on rwuerse if...nectmary and identify by block number) S FIELD GROUP SUB. GR. % 19. ABSTRACT ( Continue on reverse if necessary and identify by block numbero Recent DoD...USAF installation level classified information protection programs. II. BACKGROUND. Recent unauthorized disclosures of classified information to the

  2. Shepherd in Service Module installing items

    NASA Image and Video Library

    2001-03-30

    ISS01-E-5128 (December 2000) --- Astronaut William M. Shepherd, commander for the Expedition One mission, floats in the microgravity, shirt-sleeve environment of the International Space Station's Zvezda Service Module. Shepherd was taking a brief break from work to install various furnishings for the SM. The image was taken with a digital still camera and down linked from the station to ground controllers in Houston.

  3. Water Loss Control for Military Installations

    DTIC Science & Technology

    2011-05-12

    US Army Corps of Engineers BUILDING STRONG® Water Loss Control for Military Installations Richard J. Scholze US Army ERDC-CERL, Champaign, IL...THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 BUILDING STRONG® BUILDING STRONG® BUILDING STRONG® Background...economic and environmental concerns  Preventive maintenance ► Water systems underground, out of sight, out of mind BUILDING STRONG® True Cost of

  4. Evolution of the Installation Management Command

    DTIC Science & Technology

    2007-03-30

    USAWC STRATEGY RESEARCH PROJECT THE EVOLUTION OF THE INSTALLATION MANAGEMENT COMMAND by Ms. Betty J. Sumpter...Association of Colleges and Schools, 3624 Market Street, Philadelphia, PA 19104, (215) 662-5606. The Commission on Higher Education is an institutional...collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 30 MAR 2007 2. REPORT TYPE Strategy Research

  5. Water Sludge Management for Military Installations

    DTIC Science & Technology

    1989-11-01

    Liehr Prakash M. Temkar Edgar D. Smith ) CS Water treatment plants on military installations are required to meet Federal regulations cov- ering sludge...8 Types of Water Treatment Plants 8 Coagulation Waste Streams 8 Softening Waste Streams 10 3 WASTE DISPOSAL: REGULATIONS AND METHODS...CHARACTERISTICS OF WATER TREATMENT PLANT WASTES ............. 21 Types of Waste Generated 21 Amount of Waste Generated 21 General Characteristics 24 Tests To

  6. TMS installation at A-1 Test Stand

    NASA Image and Video Library

    2010-03-03

    A new thrust measurement system is lifted onto the A-1 Test Stand deck at NASA's John C. Stennis Space Center in preparation for its installation. The new system is a state-of-the-art upgrade for the testing structure, which is being prepared for testing of next-generation rocket engines. The system was fabricated by Thrust Measurement Systems in Illinois at a cost of about $3.5 million.

  7. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    A new thrust measurement system is lifted onto the A-1 Test Stand deck at NASA's John C. Stennis Space Center in preparation for its installation. The new system is a state-of-the-art upgrade for the testing structure, which is being prepared for testing of next-generation rocket engines. The system was fabricated by Thrust Measurement Systems in Illinois at a cost of about $3.5 million.

  8. TMS installation at A-1 Test Stand

    NASA Image and Video Library

    2010-03-03

    Stennis Space Center employees maneuver a new thrust measurement system in preparation for its installation on the A-1 Test Stand on March 3. The system was fabricated by Thrust Measurement Systems in Illinois and represents a state-of-the-art upgrade from the equipment used on the stand for more than 40 years. The A-1 Test Stand is being upgraded to provide testing for the next generation of rocket engines for America's space program.

  9. TMS installation at A-1 Test Stand

    NASA Technical Reports Server (NTRS)

    2010-01-01

    Stennis Space Center employees maneuver a new thrust measurement system in preparation for its installation on the A-1 Test Stand on March 3. The system was fabricated by Thrust Measurement Systems in Illinois and represents a state-of-the-art upgrade from the equipment used on the stand for more than 40 years. The A-1 Test Stand is being upgraded to provide testing for the next generation of rocket engines for America's space program.

  10. Using Former Military Installations as Correctional Facilities

    DTIC Science & Technology

    1990-03-01

    facilities. It reviews the job- and income-generating effects of these facilities compared with equivalent effects when the bases were open. It also pr...government about this reuse option. It is intended to help communities make stronger, more effective , and balanced reuse decisions for former military...support made the eventual use a reality. 9 Analysis indicates the attractive cost effectiveness of correctional uses of former military installations

  11. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  12. Gerst installs CMS-2 in KIBO rack

    NASA Image and Video Library

    2014-09-09

    ISS040-E-130230 (9 Sept. 2014) --- European Space Agency astronaut Alexander Gerst, Expedition 40 flight engineer, installs a microscope for the Cell Mechanosensing-2 experiment in the Kibo laboratory of the International Space Station. The Japanese experiment, which is conducted in Kibo’s Kobairo rack, seeks to identify gravity sensors in cells that may change the expression of key proteins and genes and allowing muscles to atrophy in microgravity.

  13. Gerst installs CMS-2 in KIBO rack

    NASA Image and Video Library

    2014-09-09

    European Space Agency astronaut Alexander Gerst,Expedition 40 flight engineer,installs a microscope for the Cell Mechanosensing-2 experiment in the Kibo laboratory of the International Space Station. The Japanese experiment,which is conducted in Kibos Kobairo rack,seeks to identify gravity sensors in cells that may change the expression of key proteins and genes and allowing muscles to atrophy in microgravity.

  14. Gerst installs CMS-2 in KIBO rack

    NASA Image and Video Library

    2014-09-09

    ISS040-E-130231 (9 Sept. 2014) --- European Space Agency astronaut Alexander Gerst, Expedition 40 flight engineer, installs a microscope for the Cell Mechanosensing-2 experiment in the Kibo laboratory of the International Space Station. The Japanese experiment, which is conducted in Kibo’s Kobairo rack, seeks to identify gravity sensors in cells that may change the expression of key proteins and genes and allowing muscles to atrophy in microgravity.

  15. Gerst installs CMS-2 in KIBO rack

    NASA Image and Video Library

    2014-09-09

    ISS040-E-130233 (9 Sept. 2014) --- European Space Agency astronaut Alexander Gerst, Expedition 40 flight engineer, installs a microscope for the Cell Mechanosensing-2 experiment in the Kibo laboratory of the International Space Station. The Japanese experiment, which is conducted in Kibo’s Kobairo rack, seeks to identify gravity sensors in cells that may change the expression of key proteins and genes and allowing muscles to atrophy in microgravity.

  16. Gerst installs CMS-2 in KIBO rack

    NASA Image and Video Library

    2014-09-09

    ISS040-E-130232 (9 Sept. 2014) --- European Space Agency astronaut Alexander Gerst, Expedition 40 flight engineer, installs a microscope for the Cell Mechanosensing-2 experiment in the Kibo laboratory of the International Space Station. The Japanese experiment, which is conducted in Kibo’s Kobairo rack, seeks to identify gravity sensors in cells that may change the expression of key proteins and genes and allowing muscles to atrophy in microgravity.

  17. Neutrino experiments at LSD and ASD installations.

    NASA Astrophysics Data System (ADS)

    Dadykin, V. L.; Khalchukov, F. F.; Korchagin, V. B.; Korchagin, P. V.; Korolkova, E. V.; Malgin, A. S.; Mal'Gin, A. S.; Ryassny, V. G.; Ryasnyj, V. G.; Ryazhskaya, O. G.; Talochkin, V. P.; Yakushev, V. F.; Zatsepin, G. T.; Aglietta, M.; Badino, G.; Bologna, G. F.; Castagnoli, C.; Castellina, A.; Fulgione, W.; Galeotti, P.; Saavedra, O.; Trinchero, G. C.; Vallania, P.; Vernetto, S.

    No candidate for an antineutrino burst from collapsing stars has been observed during more than 4 years of ASD (Artymovsk Scintillation Detector) and 250 days of LSD (Large Scintillation Detector, Mont Blanc) lifetime. The data collected by the LSD installation are used to obtain an upper limit on the flux of atmospheric neutrinos, and to examine the possibility of detecting solar neutrinos and the correlation between their flux and solar activity.

  18. Mobilization Handbook for Installation Manpower Planners

    DTIC Science & Technology

    1989-06-01

    Manpower Mobilization Planning ," and as a supplement to policy guidance contained in DoD Directive .40j.31, "Mobilization Management of the DoD Civilian...Work Force." It’s purpose is to help reinforce mobilization readiness by providing a planning reference guide for Continental United States (CONUS...installations of the Department of Defense (DoD). It is designed to assist local manpower and personnel planners in anticipating and planning the

  19. Installation of electric generators on turbine engines

    NASA Technical Reports Server (NTRS)

    Demel, H. F.

    1983-01-01

    The installation of generators on turbine aircraft is discussed. Emphasis is placed on the use of the samarium cobalt generator. Potential advantages of an electric secondary power system at the engine level are listed. The integrated generator and the externally mounted generator are discussed. It is concluded that the integrated generator is best used in turbojet and low bypass ratio engines where there is no easy way of placing generators externally without influencing frontal areas.

  20. A General Purpose High Performance Linux Installation Infrastructure

    SciTech Connect

    Wachsmann, Alf

    2002-06-17

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation.

  1. Polarization Mode Dispersion of Installed Fibers

    NASA Astrophysics Data System (ADS)

    Brodsky, Misha; Frigo, Nicholas J.; Boroditsky, Misha; Tur, Moshe

    2006-12-01

    Polarization mode dispersion (PMD), a potentially limiting impairment in high-speed long-distance fiber-optic communication systems, refers to the distortion of propagating optical pulses due to random birefringences in an optical system. Because these perturbations (which can be introduced through manufacturing imperfections, cabling stresses, installation procedures, and environmental sensitivities of fiber and other in-line components) are unknowable and continually changing, PMD is unique among optical impairments. This makes PMD both a fascinating research subject and potentially one of the most challenging technical obstacles for future optoelectronic transmission. Mitigation and compensation techniques, proper emulation, and accurate prediction of PMD-induced outage probabilities critically depend on the understanding and modeling of the statistics of PMD in installed links. Using extensive data on buried fibers used in long-haul high-speed links, the authors discuss the proposition that most of the temporal PMD changes that are observed in installed routes arise primarily from a relatively small number of “hot spots” along the route that are exposed to the ambient environment, whereas the buried shielded sections remain largely stable for month-long time periods. It follows that the temporal variations of the differential group delay for any given channel constitute a distinct statistical distribution with its own channel-specific mean value. The impact of these observations on outage statistics is analyzed, and the implications for future optoelectronic fiber-based transmission are discussed.

  2. Design and construction experience from photovoltaic installations

    NASA Astrophysics Data System (ADS)

    Kauffman, W. R.; Lambarski, T. J.; Forrester, D. L.

    Lessons learned by one company during the design, construction, and operation of several prototype commercial photovoltaic (PV) power plants are reported. Intensive on-site quality control management was found necessary for controlling costs during installation of a 1 MW array for utility power production. A need to use modular components to offset high labor costs was noted. Installation of a 240 kW array of parabolic trough concentrators at a community school revealed the significance of stable support structures for tracking systems, which require reliable electronics for operation. A roof-mounted 50 kW array showed the potential hazards from wind damage and the greater economic benefits that accrue from maximizing output rather than cutting corners on the system costs. An airbase 40 kW array disclosed heat dissipation and moisture intrusion problems in ancillary equipment, and a residential 4.68 kW roof-mounted system demonstrated the increases in installation efficiency available with larger crews and greater experience.

  3. Altitude Wind Tunnel Drive Motor Installation

    NASA Image and Video Library

    1943-07-21

    Construction workers install the drive motor for the Altitude Wind Tunnel (AWT) in the Exhauster Building at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory. The AWT was capable of operating full-scale engines in air density, speed, and temperature similar to that found at high altitudes. The tunnel could produce wind speeds up to 500 miles per hour through a 20-foot-diameter test section at the standard operating altitude of 30,000 feet. The airflow was created by a large wooden fan near the tunnel’s southeast corner. This photograph shows the installation of the 18,000-horsepower drive motor inside the adjoining Exhauster Building in July 1943. The General Electric motor, whose support frame is seen in this photograph, connected to a drive shaft that extended from the building, through the tunnel shell, and into a 12-bladed, 31-foot-diameter spruce wood fan. Flexible couplings on the shaft allowed for the movement of the shell. The corner of the Exhauster Building was built around the motor after its installation. The General Electric induction motor could produce 10 to 410 revolutions per minute and create wind speeds up to 500 miles per hour, or Mach 0.63, at 30,000 feet. The AWT became operational in January 1944 and tested piston, turbojet and ramjet engines for nearly 20 years.

  4. How to install main belts efficiently

    SciTech Connect

    Ketz, J.

    1985-03-01

    Belt conveyors and mine cars form an integral part of the connecting link between an underground working area and the preparation plant. Problems in the link are sometimes neglected while attention is centered on the face. Eventually the neglect may cause the mine to shut down because its operating costs are too high. Mine operators can reduce the chances of such a calamity by correctly installing one of those key links, the main haulage belt conveyors. The following recommendations are based on the author's engineering experience in deep mines. The drive is the heart of the belt conveyor. Five components must be installed properly so that the mechanics can fine tune the belt conveyor drive. A concrete base is essential for a main haulage conveyor projected to be in service for more than 10 years. Beams with 6-in.-wide flanges should be welded to rails embedded in the concrete base. The drive is welded to the 6-in. beams for a permanent installation, and the beams allow dust to be cleaned from under the drive.

  5. Extra-Territorial Siting of Nuclear Installations

    SciTech Connect

    Shea, Thomas E.; Morris, Frederic A.

    2009-10-07

    Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

  6. Using uh and um in spontaneous speaking.

    PubMed

    Clark, Herbert H; Fox Tree, Jean E

    2002-05-01

    The proposal examined here is that speakers use uh and um to announce that they are initiating what they expect to be a minor (uh), or major (um), delay in speaking. Speakers can use these announcements in turn to implicate, for example, that they are searching for a word, are deciding what to say next, want to keep the floor, or want to cede the floor. Evidence for the proposal comes from several large corpora of spontaneous speech. The evidence shows that speakers monitor their speech plans for upcoming delays worthy of comment. When they discover such a delay, they formulate where and how to suspend speaking, which item to produce (uh or um), whether to attach it as a clitic onto the previous word (as in "and-uh"), and whether to prolong it. The argument is that uh and um are conventional English words, and speakers plan for, formulate, and produce them just as they would any word.

  7. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    PubMed

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  8. Energy Integrated Dairy Farm digester and cogeneration system installation

    SciTech Connect

    Ross, C.C.; Walsh, J.L.

    1984-01-01

    Georgia Tech finished in December, 1983 Phase II (system installation and startup) of its four year Energy Integrated Dairy Farm System (EIDFS) program. This paper outlines the selection and installation of the anaerobic digestion and cogeneration components of the EIDFS.

  9. Design and installation package for a solar powered pump

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  10. A NEW RUSSIAN WASTE MANAGEMENT INSTALLATION

    SciTech Connect

    Griffith, Andrew; Engxy, Thor; Endregard, Monica; Schwab, Patrick; Nazarian, Ashot; Krumrine, Paul; Backe, Steinar; Gorin, Stephen; Evans, Brent

    2003-02-27

    The Polyarninsky Shipyard (sometimes called Navy Yard No. 10 or the Shkval Shipyard) has been designated as the recipient for Solid Radioactive Waste (SRW) management facilities under the Arctic Military Environmental Cooperation (AMEC) Program. The existing SRW storage site at this shipyard is filled to capacity, which is forcing the shipyard to reduce its submarine dismantlement activities. The Polyarninsky Shipyard Waste Management Installation is planned as a combination of several AMEC projects. It will have several elements, including a set of hydraulic metal cutting tools, containers for transport and storage, the Mobile Pretreatment Facility (MPF) for Solid Radioactive Waste, the PICASSO system for radiation monitoring, and a Waste Storage Facility. Hydraulically operated cutting tools can cut many metal items via shearing so that dusts or particulates are not generated. The AMEC Program procured a cutting tool system, consisting of a motor and hydraulic pumping unit, a 38-mm conduit-cutting tool, a 100- mm pipe-cutting tool, and a spreading tool all mounted on a wheeled cart. The vendor modified the tool system for extremely cold conditions and Russian electrical standards, then delivered the tool system to the Polyarninsky shipyard. A new container for transportation and storage of SRW and been designed and fabricated. The first 400 of these containers have been delivered to the Northern Fleet of the Russian Navy for use at the Polyarninsky Shipyard Waste Management Installation. These containers are cylindrical in shape and can hold seven standard 200-liter drums. They are the first containers ever certified in Russia for the offsite transport of military SRW. These containers can be transported by truck, rail, barge, or ship. The MPF will be the focal point of the Polyarninsky Shipyard Waste Management Installation and a key element in meeting the nuclear submarine dismantlement and waste processing needs of the Russian Federation. It will receive raw

  11. Method of installing sub-sea templates

    SciTech Connect

    Hampton, J.E.

    1984-03-06

    A subsea template is installed by a method which includes the steps of securing the template in a position beneath the deck of a semi-submersible drilling vessel, moving the semi-submersible drilling vessel to an appropriate offshore site and subsequently lowering the template from the semi-submersible to the sea bed. In addition, at least three anchorage templates may be loaded onto one or both of the pontoons of the semi-submersible drilling vessel at its original position and are subsequently lowered from the pontoons to their respective locations on the sea bed after the semi-submersible has moved to the offshore site.

  12. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians prepare several Nanoracks for installation on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  13. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians prepare to install several Nanoracks on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  14. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, preparations are underway to install the Nanoracks on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  15. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians begin the process to install several Nanoracks on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  16. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians have installed several Nanoracks on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  17. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, technicians prepare thermal blankets for several Nanoracks that will be installed on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  18. OA-7 Nano-rack Installation

    NASA Image and Video Library

    2017-02-27

    Inside the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center in Florida, a technician adjusts the thermal blankets around the area where several Nanoracks will be installed on the exterior of the Orbital ATK Cygnus pressurized cargo module. The Orbital ATK CRS-7 commercial resupply services mission to the International Space Station is scheduled to launch atop a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station no earlier than March 21, 2017. Cygnus will deliver 7,600 pounds of supplies, equipment and scientific research materials to the space station.

  19. Installation Contracting Offices - A Time for Change

    DTIC Science & Technology

    1989-03-22

    controls over and provide technical assistance to installation contracting staffs. In a 21 June 1988 memorandum, Dr. J. R. Sculley , ASA(RDA), advised...2. Fred Reed, "Don’t Bank on Procurement Reform," Army Times Washington, 20 March 1989, p. 70. 3. Jay R. Sculley , U.S. Department of the Army...Washington), 20 March 1989, p. 70. 8. Sculley , Jay R., U.S. Department of the Army. Memorandum to Major Army Commander, 21 June 1988. 9. U.S. Army

  20. Work Continues on Installing New Countdown Clock

    NASA Image and Video Library

    2014-11-26

    At NASA's Kennedy Space Center in Florida, work continues to install 24 light emitting diode LED panels in the new countdown clock at the spaceport's Press Site. The modern, multimedia display is similar to the screens seen at sporting venues. The new screen will be nearly 26 feet wide by 7 feet high, a foot taller than the original clock. The historic countdown clock was designed by Kennedy engineers and built by space center technicians before Apollo 12 in 1969. NASA has requested to acquire the countdown clock from the agency’s Artifact Working Group at the agency's Headquarters for likely display at the Kennedy Space Center Visitor Complex.

  1. Williams installs CBEF Cell Mechanosensing Humidifier

    NASA Image and Video Library

    2016-04-01

    ISS047e032018 (04/01/2016) --- NASA astronaut Jeff Williams works to install the Cell Biology Experiment Facility (CBEF) Cell Mechanosensing Humidifier. Cell Mechanosensing is a Japan Aerospace Exploration Agency (JAXA) investigation that identifies gravity sensors in skeletal muscle cells to develop countermeasures to muscle atrophy, a key space health issue. Scientists believe that the lack of mechanical stress from gravity causes tension fluctuations in the plasma membrane of skeletal muscle cells which changes the expression of key proteins and genes, and allows muscles to atrophy.

  2. Jim Walter Resources installs new overland conveyor

    SciTech Connect

    Fiscor, S.

    2008-12-15

    Embarking on a major expansion plan, the company is constructing a new additional overland conveyor coal to a recently refurbished prep plant. Jim Walter Resources recently invested $20 million in a new 5-mile overland conveyor system to haul coal from the No.7 deep coal mine in Alabama to the No.5 coal preparation plant. The size of the No.7 mine was effectively doubled. The article describes how this expansion move was decided upon and describes the design and installation of the new conveyor which spans approximately 5 miles. 4 photos.

  3. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  4. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  5. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  6. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  7. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  8. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  9. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  10. 49 CFR 192.321 - Installation of plastic pipe.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  11. 49 CFR 192.193 - Valve installation in plastic pipe.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  12. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  13. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  14. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded...

  15. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet...

  16. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet...

  17. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet...

  18. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet...

  19. 46 CFR 111.60-5 - Cable installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet...

  20. 46 CFR 105.25-10 - Cargo pumping installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMERCIAL FISHING VESSELS DISPENSING PETROLEUM PRODUCTS Additional Requirements-When Cargo Tanks Are Installed Below Decks § 105.25-10 Cargo pumping installation. (a) Cargo pumps shall not be installed in the... cargo tanks shall be run directly to the pump, but not through working or crew spaces of vessel....

  1. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  2. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  3. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  4. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  5. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Customer meters and regulators: Installation. 192... Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a) Each meter and each regulator must be installed so as to minimize anticipated stresses upon...

  6. 32 CFR 634.25 - Installation traffic codes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25... CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activity commanders will establish a traffic code for operation of...

  7. 46 CFR 181.520 - Installation and location.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  8. 32 CFR 809a.1 - Random installation entry point checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 6 2010-07-01 2010-07-01 false Random installation entry point checks. 809a.1... Entry Policy § 809a.1 Random installation entry point checks. The installation commander determines when, where, and how to implement random checks of vehicles or pedestrians. The commander conducts random...

  9. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  10. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  11. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  12. 46 CFR 111.35-1 - Electrical propulsion installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical propulsion installations. 111.35-1 Section... ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Propulsion § 111.35-1 Electrical propulsion installations. Each electric propulsion installation must meet sections 4-8-5/5.5, 4-8-5/5.11, 4-8-5/5.13,...

  13. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  14. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 6 2014-07-01 2014-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  15. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  16. 32 CFR 1903.13 - Intoxicated on an Agency installation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 6 2012-07-01 2012-07-01 false Intoxicated on an Agency installation. 1903.13 Section 1903.13 National Defense Other Regulations Relating to National Defense CENTRAL INTELLIGENCE AGENCY CONDUCT ON AGENCY INSTALLATIONS § 1903.13 Intoxicated on an Agency installation. Presence on...

  17. 14 CFR 27.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 27.1301 Section... AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Equipment General § 27.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function; (b...

  18. 14 CFR 23.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 23.1301 Section... Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function. (b) Be labeled as to its identification, function, or operating limitations...

  19. 14 CFR 29.1301 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 29.1301 Section... AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment General § 29.1301 Function and installation. Each item of installed equipment must— (a) Be of a kind and design appropriate to its intended function...

  20. 14 CFR 31.71 - Function and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation. 31.71 Section 31... AIRWORTHINESS STANDARDS: MANNED FREE BALLOONS Equipment § 31.71 Function and installation. (a) Each item of installed equipment must— (1) Be of a kind and design appropriate to its intended function; (2) Be...

  1. 40 CFR 1042.130 - Installation instructions for vessel manufacturers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... AND VESSELS Emission Standards and Related Requirements § 1042.130 Installation instructions for... installation instructions”. (2) State: “Failing to follow these instructions when installing a certified engine...) Describe any vessel labeling requirements specified in § 1042.135. (c) You do not need...

  2. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    SciTech Connect

    WHITE, W.F.

    1999-12-16

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services.

  3. An earth anchor system: installation and design guide.

    Treesearch

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  4. 24 CFR 3286.5 - Overview of installation program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban... Requirements § 3286.5 Overview of installation program. (a) HUD-administered installation program. HUD...

  5. 24 CFR 3286.5 - Overview of installation program.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Overview of installation program. 3286.5 Section 3286.5 Housing and Urban Development Regulations Relating to Housing and Urban... Requirements § 3286.5 Overview of installation program. (a) HUD-administered installation program. HUD...

  6. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2011-10-01 2011-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  7. 46 CFR 58.10-15 - Gas turbine installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-15 Gas turbine installations. (a) Standards. The design, construction, workmanship and tests of gas turbines and their associated... 46 Shipping 2 2010-10-01 2010-10-01 false Gas turbine installations. 58.10-15 Section 58.10-15...

  8. 30 CFR 57.12050 - Installation of trolley wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of trolley wires. 57.12050 Section 57.12050 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12050 Installation of trolley wires. Trolley wires shall be installed...

  9. 40 CFR 1036.130 - Installation instructions for vehicle manufacturers.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE HEAVY-DUTY HIGHWAY ENGINES Emission... you sell an engine for someone else to install in a vehicle, give the engine installer instructions... ensure that an engine will be installed in its certified configuration. (b) Make sure these instructions...

  10. 40 CFR 1036.130 - Installation instructions for vehicle manufacturers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE HEAVY-DUTY HIGHWAY ENGINES Emission... you sell an engine for someone else to install in a vehicle, give the engine installer instructions... ensure that an engine will be installed in its certified configuration. (b) Make sure these instructions...

  11. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  12. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  13. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used for...

  14. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  15. 46 CFR 119.430 - Engine exhaust pipe installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... prevent backflow of water from reaching engine exhaust ports under normal conditions. (d) Pipes used for...

  16. 47 CFR 80.872 - The VHF radiotelephone installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false The VHF radiotelephone installation. 80.872... to Subpart W § 80.872 The VHF radiotelephone installation. The VHF radiotelephone installation includes: (a) A VHF radiotelephone transmitter, (b) A VHF radiotelephone receiver, (c) A power supply,...

  17. 47 CFR 80.872 - The VHF radiotelephone installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false The VHF radiotelephone installation. 80.872... to Subpart W § 80.872 The VHF radiotelephone installation. The VHF radiotelephone installation includes: (a) A VHF radiotelephone transmitter, (b) A VHF radiotelephone receiver, (c) A power supply,...

  18. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  19. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  20. 48 CFR 1850.104-70 - Lead NASA installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Lead NASA installation... Actions 1850.104-70 Lead NASA installation. (a) Contractors applying for indemnification shall determine which NASA installation has the highest dollar amount of contracts for which indemnification is...

  1. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  2. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  3. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  4. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  5. 46 CFR 169.607 - Keel cooler installations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Keel cooler installations. 169.607 Section 169.607 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Internal Combustion Engine Installations § 169.607 Keel cooler installations....

  6. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  7. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  8. 30 CFR 57.12067 - Installation of transformers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...

  9. 30 CFR 77.200 - Surface installations; general.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface installations; general. 77.200 Section... AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.200 Surface installations; general. All mine structures, enclosures,...

  10. 30 CFR 77.202 - Dust accumulations in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dust accumulations in surface installations. 77... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.202 Dust accumulations in surface installations. Coal...

  11. 30 CFR 77.204 - Openings in surface installations; safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Openings in surface installations; safeguards... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.204 Openings in surface installations; safeguards....

  12. 30 CFR 77.205 - Travelways at surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Travelways at surface installations. 77.205... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Surface Installations § 77.205 Travelways at surface installations. (a) Safe means of...

  13. 6 CFR 11.9 - Collection in installments.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Collection in installments. 11.9 Section 11.9 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CLAIMS § 11.9 Collection in installments. DHS may accept payment of a DHS debt in regular installments, in accordance with the...

  14. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The...

  15. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 16 Commercial Practices 2 2011-01-01 2011-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  16. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 16 Commercial Practices 2 2012-01-01 2012-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  17. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 16 Commercial Practices 2 2014-01-01 2014-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  18. 16 CFR 1211.15 - Field-installed labels.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 16 Commercial Practices 2 2013-01-01 2013-01-01 false Field-installed labels. 1211.15 Section 1211... SAFETY STANDARD FOR AUTOMATIC RESIDENTIAL GARAGE DOOR OPERATORS The Standard § 1211.15 Field-installed labels. (a) A residential garage door operator shall be provided with labels for field installation...

  19. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of...

  20. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of...

  1. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of...

  2. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of...

  3. 46 CFR 77.03-1 - Installation and details.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction, and installation, shall be in accordance with the requirements of subchapter F (Marine Engineering) of...

  4. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...) The installer must display an original or a copy of a valid installation license at the site of the... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...

  5. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...) The installer must display an original or a copy of a valid installation license at the site of the... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...

  6. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...) The installer must display an original or a copy of a valid installation license at the site of the... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...

  7. 24 CFR 3286.203 - Installation license required.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... installation license is not required for: (1) Site preparation that is not subject to the requirements of part...) The installer must display an original or a copy of a valid installation license at the site of the... emergency housing after a natural disaster; or (7) Work performed at the home site that is not covered by...

  8. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  9. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  10. 45 CFR 2532.10 - Military Installation Conversion Demonstration programs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Military Installation Conversion Demonstration... Military Installation Conversion Demonstration programs. (a) Purposes. The purposes of this section are to...) Fully utilize military installations affected by closures or realignments; (3) Encourage...

  11. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...

  12. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...

  13. 30 CFR 77.201 - Methane content in surface installations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Methane content in surface installations. 77.201 Section 77.201 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Surface Installations § 77.201 Methane content in surface installations. The methane...

  14. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell temperatures...

  15. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  16. 14 CFR 23.929 - Engine installation ice protection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Engine installation ice protection. 23.929... General § 23.929 Engine installation ice protection. Propellers (except wooden propellers) and other components of complete engine installations must be protected against the accumulation of ice as necessary to...

  17. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Collection in installments. 309.6 Section 309.6 Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace...

  18. 22 CFR 309.6 - Collection in installments.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Collection in installments. 309.6 Section 309.6 Foreign Relations PEACE CORPS DEBT COLLECTION General Provisions § 309.6 Collection in installments... unable to pay the indebtedness in one lump sum, payment may be accepted in regular installments. If Peace...

  19. 24 CFR 3285.907 - Manufacturer additions to installation instructions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Manufacturer additions to... Optional Information for Manufacturer's Installation Instructions § 3285.907 Manufacturer additions to installation instructions. A manufacturer may include in its installation instructions items that are...

  20. 14 CFR 23.1353 - Storage battery design and installation.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Storage battery design and installation. 23... Equipment Electrical Systems and Equipment § 23.1353 Storage battery design and installation. (a) Each storage battery must be designed and installed as prescribed in this section. (b) Safe cell temperatures...