Sample records for installed operating system

  1. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  2. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  3. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  4. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon... carbon monoxide. (b) You must install, evaluate, and operate each continuous emission monitoring system...

  5. Installation package for a solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information is given for a solar heating system installed in Concho Indian School at El Reno, Oklahoma. This package includes a system Operation and Maintenance Manual, hardware brochures, schematics, system operating modes and drawings.

  6. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.33-20 Section 76.33-20... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so... audible alarm in the engine room. For installations contracted for on or after January 1, 1962, where...

  7. 46 CFR 76.27-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  8. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  9. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  10. 46 CFR 76.30-15 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  11. Instructor's Manual for Teaching and Practical Courses on Design of Systems and Sizing, Installation and Operation of Systems for Solar Heating and Cooling of Residential Buildings.

    ERIC Educational Resources Information Center

    Colorado State Univ., Ft. Collins. Solar Energy Applications Lab.

    Presented are guidelines for instructors of two courses in the design, installation, and operation of solar heating and cooling systems. These courses are: (1) Design of Systems, and (2) Sizing, Installation, and Operation of Systems. Limited in scope to active solar systems for residential buildings, these courses place primary emphasis upon…

  12. Installation package for Hyde Memorial Observatory, Lincoln, Nebraska

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Installation information for a solar heating system installed in Hyde Memorial Observatory at Lincoln, Nebraska is presented. This package included a system operation and maintenance manual, hardware brochures, schematics, system operating modes, and drawings. This prototype solar heating system consisted of the following subsystems: solar collector, control, and storage.

  13. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.430 When must I install a diverter system? You must install a diverter system before you drill a conductor or surface hole. The diverter system...

  14. 40 CFR 60.2730 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuously operate a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a...

  15. 46 CFR 76.25-35 - Operation and installation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  16. New concept for a general purpose subsea installation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Citi, G.; Cowen, S.; Radicioni, A.

    1996-12-31

    The first use of the Agip SAF System (Sistema Alti Fondali), an installation and maintenance system for subsea production systems up to 1,000 m water depth, was successfully performed on the Luna 40 well in 180 m w.d. The system successfully installed the christmas tree, flowline jumpers, control system and high pressure cap as well as deploying the LMRP to allow the commissioning of the well. The SAF system performed all the planned tasks during the installation of the Luna 40 subsea tree and now has to be considered an operational success. The system is based around a Master Vehiclemore » that provides hydraulic power to, and controls a set of dedicated work modules. During the 2 test and 5 working dives, the Master Vehicle and the modules were subsea for a considerable period of time, up to 75 hours continuously, without any operational failures. This installation uncovered some system deficiencies that will have to be studied to improve the reliability and operability of the system. From the experience gained during this operation it has been shown that the system of a Master Vehicle providing locally generated hydraulic power is a feasible approach to many subsea installation problems. This paper describes the SAF system including improvements to be performed before being used operationally in up to 1,000 m of water and over. It also covers the necessary modifications required to allow the system to be deployed from a wide range of installation vessel.« less

  17. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  18. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  19. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  20. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  1. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  2. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  3. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Specifications for the Design, Installation and Operation of a Part Flow System for Control of Overboard Discharges E Appendix E to Part 157... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for...

  4. 40 CFR 63.7830 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) of this section. (1) Install, operate, and maintain a bag leak detection system according to § 63... § 63.7832; or (2) If you do not install and operate a bag leak detection system, you must install... bag leak detection system and COMS are not required for a baghouse that meets the requirements in...

  5. 78 FR 23685 - Airworthiness Directives; The Boeing Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... installing new operational software for the electrical load management system and configuration database. The..., installing a new electrical power control panel, and installing new operational software for the electrical load management system and configuration database. Since the proposed AD was issued, we have received...

  6. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a bag leak detection system as specified in paragraphs (b)(1) through (8) of this section. (1) You must install and operate a bag leak detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be installed, operated, calibrated, and maintained in a manner...

  7. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...

  8. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  9. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  10. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  11. 46 CFR 76.33-20 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... EQUIPMENT Smoke Detecting System, Details § 76.33-20 Operation and installation. (a) The system shall be so arranged and installed that the presence of smoke in any of the protected spaces will automatically be... automatically indicate the zone in which the smoke originated. The detecting cabinet shall normally be located...

  12. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  13. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  14. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  15. 46 CFR 76.35-15 - Operation and installation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...

  16. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... mechanical and electrical systems to be installed was approved by registered professional engineers. After... Installation of Offshore Production Platform Piping Systems; (3) Electrical system information including a plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  17. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  18. 14 CFR 27.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... showing compliance with paragraph (a), (b), or (c) of this section, the effects of lightning strikes on..., systems, and installations. (a) The equipment, systems, and installations whose functioning is required by... under any foreseeable operating condition. (b) The equipment, systems, and installations of a...

  19. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Qualification Monitoring § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon...

  20. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  1. 40 CFR 60.2939 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems must I install? 60.2939 Section 60.2939 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... § 60.2939 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for carbon monoxide and for oxygen. You must...

  2. DEVELOPMENT, INSTALLATION AND OPERATION OF THE MPC&A OPERATIONS MONITORING (MOM) SYSTEM AT THE JOINT INSTITUTE FOR NUCLEAR RESEARCH (JINR) DUBNA, RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kartashov,V.V.; Pratt,W.; Romanov, Y.A.

    The Material Protection, Control and Accounting (MPC&A) Operations Monitoring (MOM) systems handling at the International Intergovernmental Organization - Joint Institute for Nuclear Research (JINR) is described in this paper. Category I nuclear material (plutonium and uranium) is used in JINR research reactors, facilities and for scientific and research activities. A monitoring system (MOM) was installed at JINR in April 2003. The system design was based on a vulnerability analysis, which took into account the specifics of the Institute. The design and installation of the MOM system was a collaborative effort between JINR, Brookhaven National Laboratory (BNL) and the U.S. Departmentmore » of Energy (DOE). Financial support was provided by DOE through BNL. The installed MOM system provides facility management with additional assurance that operations involving nuclear material (NM) are correctly followed by the facility personnel. The MOM system also provides additional confidence that the MPC&A systems continue to perform effectively.« less

  3. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  4. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  5. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  6. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  7. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  8. Fabrication of a glycerol from CO2 reaction system, supplement

    NASA Technical Reports Server (NTRS)

    Weiss, A. H.

    1973-01-01

    The fabrication, installation, and testing of a glycerol hydrogenation and a CO2 hydrogenation - CH4 partial oxidation units are reported. The glycerol system proved to be operational while the CO2 system was installed but not bought on operational steam.

  9. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  10. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  11. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  12. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  13. 21 CFR 1301.27 - Separate registration by retail pharmacies for installation and operation of automated dispensing...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Separate registration by retail pharmacies for....27 Separate registration by retail pharmacies for installation and operation of automated dispensing systems at long term care facilities. (a) A retail pharmacy may install and operate automated dispensing...

  14. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  15. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations. The Carrier Preparation Building Materials Handling System interfaces with the Cask/Carrier Transport System to move the carriers to and from the system. The Carrier Preparation Building System houses the equipment and provides the facility, utility, safety, communications, and auxiliary systems supporting operations and protecting personnel.« less

  16. Final Environmental Assessment: Installation of Digital Airport Surveillance Radar at Grand Forks Air Force Base, North Dakota

    DTIC Science & Technology

    2011-05-11

    the installation of DOD Advanced Automation Systems (DAAS) and Voice Communications Switching Systems (VCSS) at DOD bases, was previously evaluated...utilities installed immediately next to the site. Operation of the DASR system is anticipated to have minimal long-term impacts to the natural and human ... humans at ground level and is not anticipated to pose ha1m to the general population. During operation of the DASR system, fuel will be stored in

  17. 40 CFR 60.3038 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...

  18. 40 CFR 60.3038 - What continuous emission monitoring systems must I install?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... December 9, 2004 Model Rule-Monitoring § 60.3038 What continuous emission monitoring systems must I install? (a) You must install, calibrate, maintain, and operate continuous emission monitoring systems for... system according to the “Monitoring Requirements” in § 60.13. ...

  19. 14 CFR 29.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...

  20. 14 CFR 29.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... effects of lightning strikes on the rotorcraft must be considered. (Secs. 313(a), 601, 603, 604, and 605... Equipment, systems, and installations. (a) The equipment, systems, and installations whose functioning is... functions under any foreseeable operating condition. (b) The rotorcraft systems and associated components...

  1. 14 CFR Appendix D to Part 43 - Scope and Detail of Items (as Applicable to the Particular Aircraft) To Be Included in Annual and...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... group: (1) Radio and electronic equipment—for improper installation and insecure mounting. (2) Wiring...) Systems and components—for improper installation, apparent defects, and unsatisfactory operation. (3...) improper operation. (5) Flight and engine controls—for improper installation and improper operation. (6...

  2. Installation package for a sunspot cascade solar water heating system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  3. Solar heating system installed at Troy, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The completed system was composed of three basic subsystems: the collector system consisting of 3,264 square feet of Owens Illinois evacuated glass tube collectors; the storage system which included a 5,000 gallon insulated steel tank; and the distribution and control system which included piping, pumping and heat transfer components as well as the solemoid activated valves and control logic for the efficient and safe operation of the entire system. This solar heating system was installed in an existing facility and was, therefore, a retrofit system. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  4. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  5. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  6. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  7. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  8. 40 CFR 63.9307 - What are my continuous emissions monitoring system installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...

  9. Experiences running NASTRAN on the Microvax 2 computer

    NASA Technical Reports Server (NTRS)

    Butler, Thomas G.; Mitchell, Reginald S.

    1987-01-01

    The MicroVAX operates NASTRAN so well that the only detectable difference in its operation compared to an 11/780 VAX is in the execution time. On the modest installation described here, the engineer has all of the tools he needs to do an excellent job of analysis. System configuration decisions, system sizing, preparation of the system disk, definition of user quotas, installation, monitoring of system errors, and operation policies are discussed.

  10. 40 CFR 63.11553 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operator that installs bag leak detection systems: “This facility has installed a bag leak detection system in accordance with § 63.11552(b)(3) or (c), has prepared a bag leak detection system monitoring plan in accordance with § 63.11552(c), and will operate each bag leak detection system according to the...

  11. 40 CFR 60.1760 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 60.1760 Section 60.1760 Protection of Environment... continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each continuous opacity...

  12. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opacity monitoring system and how are the data used? 62.15215 Section 62.15215 Protection of Environment... required for my continuous opacity monitoring system and how are the data used? (a) Install, calibrate, maintain, and operate a continuous opacity monitoring system. (b) Install, evaluate, and operate each...

  13. Power system interface and umbilical system study

    NASA Technical Reports Server (NTRS)

    1980-01-01

    System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.

  14. 40 CFR 63.11527 - What are the monitoring requirements for new and existing sources?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... an existing affected source, you may install, operate, and maintain a bag leak detection system for.... If you own or operate a new affected source, you must install, operate, and maintain a bag leak... foot) or less. (ii) The bag leak detection system sensor must provide output of relative PM loadings...

  15. 40 CFR 265.301 - Design and operating requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... landfill unit must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal system, in accordance with § 264.301... case of any unit in which the liner and leachate collection system has been installed pursuant to the...

  16. 40 CFR 265.301 - Design and operating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... landfill unit must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal system, in accordance with § 264.301... case of any unit in which the liner and leachate collection system has been installed pursuant to the...

  17. 40 CFR 265.301 - Design and operating requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... landfill unit must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal system, in accordance with § 264.301... case of any unit in which the liner and leachate collection system has been installed pursuant to the...

  18. 40 CFR 265.301 - Design and operating requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... landfill unit must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal system, in accordance with § 264.301... case of any unit in which the liner and leachate collection system has been installed pursuant to the...

  19. 40 CFR 265.301 - Design and operating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... landfill unit must install two or more liners and a leachate collection and removal system above and between such liners, and operate the leachate collection and removal system, in accordance with § 264.301... case of any unit in which the liner and leachate collection system has been installed pursuant to the...

  20. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  1. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  2. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring systems for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  3. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate... emission monitoring system for sulfur dioxide, nitrogen oxides, and oxygen (or carbon dioxide) at the...

  4. Latest technologies on ultrasonic cleaning

    NASA Astrophysics Data System (ADS)

    Hofstetter, Hans U.

    2007-05-01

    UCM-AG manufactures Ultrasonic Cleaning Machines for highest quality requirements. The company has the know-how for cleaning and supplies cleaning systems together with the cleaning process. With a UCM of Switzerland Cleaning System, the customer gets the system itself, the cleaning process with a guarantee for the specified result but also all auxiliary equipment needed for perfect results. Therefore UCM also supplies fixtures, linkage to existing automated fabrication facilities water treatment plants etc. Thus the UCM customer gets a turnkey installation - ready to operate and including know-how. UCM of Switzerland will describe the latest technology in ultrasonic precision cleaning on the example of a recent and sophisticated installation. The installation consists of three interlinked cleaning systems which operate completely automated. The 1st system is designed for pre-cleaning to remove waxes, pitch and protection lacquers with environmentally friendly solvents which are non hazardous to the health of the operators. The 2nd system cleans the parts prior to inspection and operates with neutral or slightly alkaline detergents. The 3rd system is designed for final cleaning prior to vacuum coating and perfect results are required. It combines cleaning tanks and DI-Water rinse with lift out and vacuum dryer. The installation combines the latest technologies in ultrasonic cleaning for precision optical components. The system employs multi frequency immersed ultrasonic transducers and special rinsing technologies The complete installation will be explained in detail; the concept in its whole, the lay out, the particular setup of each cleaning system etc. will be shown and explained together with construction particulars of the complete installation.

  5. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems; (3) Electrical system information including a plan of each platform deck, outlining all hazardous... Electrical Installations at Petroleum Facilities Classified as Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical Installations at Petroleum...

  6. Greenbelt Community Project: Solar energy retrofit for a multi-family dwelling

    NASA Technical Reports Server (NTRS)

    Hymowitz, E. W.; Hannemann, R. J.; Millman, L. L.; Pownell, J. E.

    1978-01-01

    A cooperative project was initiated between Goddard Space Flight Center and the nearby community of Greenbelt, Maryland. The purpose was to design, install and operate an experimental solar heating system on a group of four tandem town houses. The system was successfully developed and is operating. A description is given of the design, installation, system operation and performance as well as the important considerations for judging the economic feasibility of solar heating systems.

  7. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The design and development of marketable solar heating and cooling systems for single family and commercial applications is described. The delivery, installation, and monitoring of the prototype systems are discussed. Seven operational test sites are discussed in terms of system performance. Problems encountered with equipment and installation were usually due to lack of skills required for solar system installation.

  8. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63... bag leak detection system? A bag leak detection system must meet the following requirements: (a) The bag leak detection system must be certified by the manufacturer to be capable of detecting PM...

  9. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  10. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and electrical systems to be installed were approved by registered professional engineers. After these... reference as specified in § 250.198). (4) Electrical system information including the following: (i) A plan... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as...

  11. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  12. 30 CFR 250.1628 - Design, installation, and operation of production systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...

  13. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  14. 47 CFR 78.51 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control system shall be installed and protected in a manner designed to prevent tampering or operation by... transmissions and a carrier operated device which will give a continuous visual indication whenever the... necessary to insure proper operation. (4) The control circuits shall be so designed and installed that short...

  15. Installation of Computerized Procedure System and Advanced Alarm System in the Human Systems Simulation Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Le Blanc, Katya Lee; Spielman, Zachary Alexander; Rice, Brandon Charles

    2016-04-01

    This report describes the installation of two advanced control room technologies, an advanced alarm system and a computerized procedure system, into the Human Systems Simulation Laboratory (HSSL). Installation of these technologies enables future phases of this research by providing a platform to systematically evaluate the effect of these technologies on operator and plant performance.

  16. 40 CFR 63.7113 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each bag leak detection system (BLDS), you... mechanical connections for leakage. (c) For each pressure measurement device, you must meet the requirements... instrumentation and alarm. (6) Bag leak detection systems must be installed, operated, adjusted, and maintained...

  17. 40 CFR 63.8450 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... electrical connections for continuity, and all mechanical connections for leakage. (d) For each pH... bag leak detection system, you must meet the requirements in paragraphs (e)(1) through (11) of this section. (1) Each triboelectric bag leak detection system must be installed, calibrated, operated, and...

  18. Update on the Puerto Rico Electric Power Authority`s spinning reserve battery system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, P.A.

    1996-11-01

    The Puerto Rico Electric Power Authority completed start-up testing and began commercial operation of a 20MW/14MWh battery energy storage facility in April 1995. The battery system was installed to provide rapid spinning reserve and frequency control for the utility`s island electrical system. This paper outlines the needs of an island utility for rapid spinning reserve; identifies Puerto Rico`s unique challenges; reviews the technical and economic analyses that justified installation of a battery energy system; describes the storage facility that was installed; and presents preliminary operating results of the facility.

  19. Solar heating and hot water system installed at Charlotte Memorial Hospital, Charlotte, North Carolina

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Detailed information regarding the design and installation of a heating and hot water system in a commercial application is given. This information includes descriptions of system and building, design philosophy, control logic operation modes, design and installation drawing and a brief description of problems encountered and their solutions.

  20. Model Analyst’s Toolkit User Guide, Version 7.1.0

    DTIC Science & Technology

    2015-08-01

    Help > About)  Environment details ( operating system )  metronome.log file, located in your MAT 7.1.0 installation folder  Any log file that...requirements to run the Model Analyst’s Toolkit:  Windows XP operating system (or higher) with Service Pack 2 and all critical Windows updates installed...application icon on your desktop  Create a Quick Launch icon – Creates a MAT application icon on the taskbar for operating systems released

  1. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  2. 40 CFR 63.7188 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Semiconductor Manufacturing Compliance Requirements § 63.7188 What are my monitoring installation, operation... emissions of your semiconductor process vent through a closed vent system to a control device, you must...

  3. 40 CFR 63.8600 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... continuity, and all mechanical connections for leakage. (d) For each pH measurement device, you must meet the... integrity and all electrical connections for continuity. (e) For each bag leak detection system, you must... leak detection system must be installed, calibrated, operated, and maintained according to the “Fabric...

  4. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  5. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  6. 40 CFR 62.15175 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... part 60. (c) You must monitor the oxygen (or carbon dioxide) concentration at each location where you..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide, and carbon monoxide. If you operate a Class I municipal waste combustion unit, also install, calibrate...

  7. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  8. 40 CFR 63.4768 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements in paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas... firebox before any substantial heat exchange occurs. (2) For a catalytic oxidizer, you must install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you established operating...

  9. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...

  10. 40 CFR 63.4168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... paragraphs (a) and (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if you establish operating limits...

  11. Solar energy system performance evaluation: Seasonal report for fern, Tunkhannock, Pennsylvania

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system is reported, and technical contributions to the definition of techniques and requirements for solar energy system design are made. The solar energy system was designed to supply space heating and domestic hot water for single-family residences. The system consists of air flat plate collectors, storage tank, pumps, heat exchangers, associated plumbing, and controls.

  12. Lessons learned from hybrid wind/PV village power system installations in Mexico

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergey, M.

    1995-09-01

    In the last three years eight decentralized village power systems utilizing small wind turbines as the primary energy source have been installed in rural Mexico. Hybrid wind/PV systems have been installed in five States and by three vendors. Seven out of the eight systems, which range i size from 9.3--71.2kW in combined wind and PV capacity, utilize one or more 10 kW wind turbines. All of these installations have battery banks and use static inverters to provide AC power for distribution to homes, businesses, and community facilities. On all but one of the systems a diesel generator is used tomore » provide back-up power. This paper attempts to summarize the range of costs and economics, performance, and operational experiences for all eight installations. Several of the systems are monitored for performance, including one that is extensively monitored under a cooperative program between the Instituto de Investigaciones Electricas and Sandia National Laboratory. Lessons learned from these systems provide insights that may allow future village power systems of this architecture to be installed at lower costs, to be operated more effectively and efficiently, and to be better able to satisfy customer requirements.« less

  13. An Administrator's Guide to Installing a Telephone System.

    ERIC Educational Resources Information Center

    Forbes, Phyllis Rossiter

    1986-01-01

    Guidelines for administrators concerning installation of a new campus telephone system address these issues: where to start; location and emergency power; the project team; paperwork; communication among those involved in installation; working with the local operating company; existing wiring; the external cable plant; special needs; and training…

  14. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  15. Solar energy system performance evaluation: Seasonal report for SEMCO, Loxahatchee, Florida

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The operational and thermal performance of a variety of solar systems installed in operational test sites are described. The analysis used is based on instrumented system data monitored and collected for at least one full season of operation. The long-term field performance of the installed system and the technical contributions to the definition of techniques and requirements solar energy system design are analyzed. The solar energy system was designed to supply domestic hot water for a family of four, single-family residences. It consists of two liquid flat plate collectors, single tank, controls, and transport lines.

  16. System installation package for the New Hampshire Vocational Technical College, Manchester, N. H.

    NASA Technical Reports Server (NTRS)

    1979-01-01

    A system installed in the residential solar laboratory located at the New Hampshire Vocational Technical College in Manchester, N. H. is described. General guidelines which may be utilized in development of detailed installation plans and specifications, as well as instructions on operation and maintenance are provided.

  17. Hot tap thermowell installation

    NASA Technical Reports Server (NTRS)

    Romero, C. A.

    1971-01-01

    System permits valve housings or other fillings to be installed in live steam lines or water pipes without interrupting their operation, thus eliminating current tapping restrictions. Two basic assemblies for installation under pressure are described.

  18. 40 CFR 63.7525 - What are my monitoring, installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tolerance of 1.27 centimeters of water or a transducer with a minimum tolerance of 1 percent of the pressure... use a fabric filter bag leak detection system to comply with the requirements of this subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as specified in...

  19. 30 CFR 250.442 - What are the requirements for a subsea BOP stack?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations...) When you drill with a subsea BOP stack, you must install the BOP system before drilling below surface casing. The District Manager may require you to install a subsea BOP system before drilling below the...

  20. Global Positioning System: A Guide for the Approval of GPS Receiver Installation and Operation

    DOT National Transportation Integrated Search

    1996-10-01

    This guide is designed to assist Federal Aviation Adalnlatratlon (FAA) Aviation Safety : Inspectors (ASIs) in evaluating new Global Positioning Systena (GPS) installations and : operations. Because there aro aany documents providing Information, regu...

  1. Installation package for a solar heating and hot water system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Development and installation of two commercial solar heating and hot water systems are reported. The systems consist of the following subsystems: collector, storage, transport, hot water, auxiliary energy and controls. General guidelines are provided which may be utilized in development of detailed installation plans and specifications. In addition, operation, maintenance and repair of a solar heating and hot water system instructions are included.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Elcam, Incorporated of Santa Barbara, California, has developed two solar water heating systems. The systems have been installed at Tempe, Arizona and San Diego, California. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank and controls. General guidelines are provided which may be utilized in development of detailed instalation plans and specifications. In addition, it provides instruction on operation, maintenance and installation of solar hot water systems.

  3. AUTOMOTIVE DIESEL MAINTENANCE L. UNIT XII, PART I--MAINTAINING THE FUEL SYSTEM (PART II), CUMMINS DIESEL ENGINE, PART II--UNIT INSTALLATION (ENGINE).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATION AND MAINTENANCE OF THE DIESEL ENGINE FUEL SYSTEM AND THE PROCEDURES FOR DIESEL ENGINE INSTALLATION. TOPICS ARE FUEL FLOW CHARACTERISTICS, PTG FUEL PUMP, PREPARATION FOR INSTALLATION, AND INSTALLING ENGINE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH…

  4. 40 CFR 63.1383 - Monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... manufacturing facility must prepare for each glass-melting furnace, rotary spin manufacturing line, and flame... glass-melting furnace, the owner or operator shall install, calibrate, maintain, and continuously... monitors. (v) A triboelectric bag leak detection system shall be installed, operated, adjusted, and...

  5. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63—Requirements for...

  6. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  7. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  8. 40 CFR Table 41 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Requirements for Installation, Operation, and Maintenance of Continuous Parameter Monitoring Systems 41 Table 41 to Subpart UUU of Part 63... Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 41 Table 41 to Subpart UUU of Part 63...

  9. System design and installation for RS600 programmable control system for solar heating and cooling

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Procedures for installing, operating, and maintaining a programmable control system which utilizes a F8 microprocessor to perform all timing, control, and calculation functions in order to customize system performance to meet individual requirements for solar heating, combined heating and cooling, and/or hot water systems are described. The manual discusses user configuration and options, displays, theory of operation, trouble-shooting procedures, and warranty and assistance. Wiring lists, parts lists, drawings, and diagrams are included.

  10. International Space Station United States Orbital Segment Oxygen Generation System On-Orbit Operational Experience

    NASA Technical Reports Server (NTRS)

    Erickson, Robert J.; Howe, John, Jr.; Kulp, Galen W.; VanKeuren, Steven P.

    2008-01-01

    The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) was originally intended to be installed in ISS Node 3. The OGS rack delivery was accelerated, and it was launched to ISS in July of 2006 and installed in the US Laboratory Module. Various modification kits were installed to provide its interfaces, and the OGS was first activated in July of 2007 for 15 hours, In October of 2007 it was again activated for 76 hours with varied production rates and day/night cycling. Operational time in each instance was limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Feedwater will be provided by PWR bag until the USOS Water Recovery System (WRS) is delivered to SS in fall of 2008. This paper will discuss operating experience and characteristics of the OGS, as well as operational issues and their resolution.

  11. Evaluation of Vehicle Detection Systems for Traffic Signal Operations

    DOT National Transportation Integrated Search

    2016-10-16

    Typical vehicle detection systems used in traffic signal operations are comprised of inductive loop detectors. Because of costs, installation challenges, and operation and maintenance issues, many alternative non-intrusive systems have been dev...

  12. A slotted cathodic protection system for bridge decks.

    DOT National Transportation Integrated Search

    1985-01-01

    A non-overlay, slotted cathodic protection system was installed two years ago on a concrete bridge deck in Virginia. The design, installation, and operation of this system are fairly straightforward. A protective current density of 1.6 mA/ft (17 mA...

  13. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arp, J.A.; Burnett, R.A.; Downing, T.R.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the Pacific Northwest National Laboratory (PNNL) under the direction of the US Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login privileges, and usage. Themore » system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment. The FEMIS system is designed for a single Chemical Stockpile Emergency Preparedness Program (CSEPP) site that has multiple Emergency Operations Centers (EOCs). Each EOC has personal computers (PCs) that emergency planners and operations personnel use to do their jobs. These PCs are connected via a local area network (LAN) to servers that provide EOC-wide services. Each EOC is interconnected to other EOCs via telecommunications links.« less

  14. 33 CFR Appendix E to Part 157 - Specifications for the Design, Installation and Operation of a Part Flow System for Control of...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Specifications for the Design... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for... Coast Guard for clarity. 1Purpose The purpose of these Specifications is to provide specific design...

  15. Installation package - home solar heater

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  16. WASP8 Download

    EPA Pesticide Factsheets

    All of the WASP Installers are listed below. There is a 64 Bit Windows Installer, 64 Bit Mac OS X (Yosemite or Higher), 64 Bit Linux (Built on Ubuntu). You will need to have knowledge on how to install software on your target operating system.

  17. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  18. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  19. 46 CFR 184.610 - Public address systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... public address system must be a fixed installation and be audible during normal operating conditions... system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in... passengers, a public address system is not required if a public announcement made from operating station...

  20. Update on Geothermal Direct-Use Installations in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beckers, Koenraad J; Young, Katherine R; Snyder, Diana M.

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others;more » power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.« less

  1. Automated System Marketplace 1988: Focused on Fulfilling Commitments.

    ERIC Educational Resources Information Center

    Walton, Robert A.; Bridge, Frank R.

    1989-01-01

    Analyzes trends in the library automation marketplace. Market shares for online vendors are examined in terms of total installations, academic libraries, public libraries, revenues, differently sized systems, and foreign installations. Hardware availability, operating systems, and interfaces with MARC are also discussed for each vendor. A source…

  2. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  3. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  4. 30 CFR 250.802 - Design, installation, and operation of surface production-safety systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Production Platform Piping Systems (as incorporated by reference in § 250.198). (4) Electrical system... classified according to API RP 500, Recommended Practice for Classification of Locations for Electrical..., Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities...

  5. Large scale implementation of guided wave based broken rail monitoring

    NASA Astrophysics Data System (ADS)

    Burger, Francois A.; Loveday, Philip W.; Long, Craig S.

    2015-03-01

    A guided wave ultrasound system has been developed over the past 17 years to detect breaks in continuously welded rail track. Installation of the version 4 system on an 840 km long heavy duty freight line was conducted between January 2013 and June 2014. The system operates in pitch - catch mode with alternate transmit and receive transducers spaced approximately 1km apart. If the acoustic signal is not received at the receive station an alarm is triggered to indicate a break in the rail between the transmit station and the receive station. The system is permanently installed, powered by solar panels and issues broken rail alarms using the GSM network where available, and digital radio technology in other areas. A total of 931 stations were installed and the entire length of rail is interrogated every fifteen minutes. The system operates reliably although some problems involving unreliable GSM communication and theft of solar panels have been experienced. In the first two months of operation four broken rails were detected and train operation was halted temporarily for repairs.

  6. 75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...

  7. SIMS prototype system 1: Design data brochure. [solar heating system

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A prototype solar heating and hot water system using air as the collector fluid and a pebble bed for heat storage was designed for installation into a single family dwelling. The system, subsystem, and installation requirements are described. System operation and performance are discussed, and procedures for sizing the system to a specific site are presented.

  8. First-order aerodynamic and aeroelastic behavior of a single-blade installation setup

    NASA Astrophysics Data System (ADS)

    Gaunaa, M.; Bergami, L.; Guntur, S.; Zahle, F.

    2014-06-01

    Limitations on the wind speed at which blade installation can be performed bears important financial consequences. The installation cost of a wind farm could be significantly reduced by increasing the wind speed at which blade mounting operations can be carried out. This work characterizes the first-order aerodynamic and aeroelastic behavior of a single blade installation system, where the blade is grabbed by a yoke, which is lifted by the crane and stabilized by two taglines. A simple engineering model is formulated to describe the aerodynamic forcing on the blade subject to turbulent wind of arbitrary direction. The model is coupled with a schematic aeroelastic representation of the taglines system, which returns the minimum line tension required to compensate for the aerodynamic forcing. The simplified models are in excellent agreement with the aeroelastic code HAWC2, and provide a solid basis for future design of an upgraded single blade installation system able to operate at higher wind speeds.

  9. Handbook of experiences in the design and installation of solar heating and cooling systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, D.S.; Oberoi, H.S.

    1980-07-01

    A large array of problems encountered are detailed, including design errors, installation mistakes, cases of inadequate durability of materials and unacceptable reliability of components, and wide variations in the performance and operation of different solar systems. Durability, reliability, and design problems are reviewed for solar collector subsystems, heat transfer fluids, thermal storage, passive solar components, piping/ducting, and reliability/operational problems. The following performance topics are covered: criteria for design and performance analysis, domestic hot water systems, passive space heating systems, active space heating systems, space cooling systems, analysis of systems performance, and performance evaluations. (MHR)

  10. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  11. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  12. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  13. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  14. 14 CFR 29.1333 - Instrument systems.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...

  15. 14 CFR 23.1335 - Flight director systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Flight director systems. 23.1335 Section 23...: Installation § 23.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the flight crew its current mode of operation. Selector switch position is not...

  16. 14 CFR 23.1335 - Flight director systems.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Flight director systems. 23.1335 Section 23...: Installation § 23.1335 Flight director systems. If a flight director system is installed, means must be provided to indicate to the flight crew its current mode of operation. Selector switch position is not...

  17. Installation package - SIMS prototype system 1A

    NASA Technical Reports Server (NTRS)

    1976-01-01

    This report consists of details for the installation, operation and maintenance of a prototype heating and hot water system, designed for residential or light commercial applications. This system consists of the following subsystems: air type collectors, pebble bed thermal storage, air handling unit, air to water heat exchanger, hot water preheat tank, auxiliary energy, ducting system.

  18. Eliminating Bias

    EPA Pesticide Factsheets

    Learn how to eliminate bias from monitoring systems by instituting appropriate installation, operation, and quality assurance procedures. Provides links to download An Operator's Guide to Eliminating Bias in CEM Systems.

  19. Development and evaluation of mechanized equipment for installation of the recessed reflective marker (RRM) delineation system. Task A, Design & feasibility analysis

    DOT National Transportation Integrated Search

    1978-06-01

    A plow-resistant recessed reflective marker (RRM) delineation system having a linear tapered profile and which uses a reflector base/reflector unit is proposed. A single-operator mechanized vehicle to install the RRM delineation system is described. ...

  20. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...

  1. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...

  2. 40 CFR 60.1720 - What continuous emission monitoring systems must I install for gaseous pollutants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems must I install for gaseous pollutants? 60.1720 Section 60.1720 Protection of Environment... or Before August 30, 1999 Model Rule-Continuous Emission Monitoring § 60.1720 What continuous..., maintain, and operate continuous emission monitoring systems for oxygen (or carbon dioxide), sulfur dioxide...

  3. A new bipolar Qtrim power supply system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mi, C.; Bruno, D.; Drozd, J.

    2015-05-03

    This year marks the 15th run of RHIC (Relativistic Heavy Ion Collider) operations. The reliability of superconducting magnet power supplies is one of the essential factors in the entire accelerator complex. Besides maintaining existing power supplies and their associated equipment, newly designed systems are also required based on the physicist’s latest requirements. A bipolar power supply was required for this year’s main quadruple trim power supply. This paper will explain the design, prototype, testing, installation and operation of this recently installed power supply system.

  4. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...

  5. 40 CFR 63.3168 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... paragraphs (c)(1) through (3) of this section: (1) For a thermal oxidizer, install a gas temperature monitor... any substantial heat exchange occurs. (2) For a catalytic oxidizer, install a gas temperature monitor....3167(b)(1) through (3), you must also install a gas temperature monitor downstream of the catalyst bed...

  6. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  7. Specification for installation of the crew activity planning system coaxial cable communication system

    NASA Technical Reports Server (NTRS)

    Allen, M. A.; Roman, G. S.

    1979-01-01

    The specification used to install a broadband coaxial cable communication system to support remote terminal operations on the Crew Activity Planning system at the Lyndon B. Johnson Space Center are reported. The system supports high speed communications between a Harris Slash 8 computer and one or more Sanders Graphic 7 displays.

  8. Digital Low Level RF Systems for Fermilab Main Ring and Tevatron

    NASA Astrophysics Data System (ADS)

    Chase, B.; Barnes, B.; Meisner, K.

    1997-05-01

    At Fermilab, a new Low Level RF system is successfully installed and operating in the Main Ring. Installation is proceeding for a Tevatron system. This upgrade replaces aging CAMAC/NIM components for an increase in accuracy, reliability, and flexibility. These VXI systems are based on a custom three channel direct digital synthesizer(DDS) module. Each synthesizer channel is capable of independent or ganged operation for both frequency and phase modulation. New frequency and phase values are computed at a 100kHz rate on the module's Analog Devices ADSP21062 (SHARC) digital signal processor. The DSP concurrently handles feedforward, feedback, and beam manipulations. Higher level state machines and the control system interface are handled at the crate level using the VxWorks operating system. This paper discusses the hardware, software and operational aspects of these LLRF systems.

  9. Radioactive air emissions notice of construction for installation and operation of a waste retrieval system and tanks 241-AP-102 and 241-AP-104 project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DEXTER, M.L.

    1999-11-15

    This document serves as a notice of construction (NOC) pursuant to the requirements of Washington Administrative Code (WAC) 246 247-060, and as a request for approval to modify pursuant to 40 Code of Federal Regulations (CFR) 61 07 for the installation and operation of one waste retrieval system in the 24 1 AP-102 Tank and one waste retrieval system in the 241 AP 104 Tank Pursuant to 40 CFR 61 09 (a)( 1) this application is also intended to provide anticipated initial start up notification Its is requested that EPA approval of this application will also constitute EPA acceptance ofmore » the initial start up notification Project W 211 Initial Tank Retrieval Systems (ITRS) is scoped to install a waste retrieval system in the following double-shell tanks 241-AP 102-AP 104 AN 102, AN 103, AN-104, AN 105, AY 102 AZ 102 and SY-102 between now and the year 2011. Because of the extended installation schedules and unknowns about specific activities/designs at each tank, it was decided to submit NOCs as that information became available This NOC covers the installation and operation of a waste retrieval system in tanks 241 AP-102 and 241 AP 104 Generally this includes removal of existing equipment installation of new equipment and construction of new ancillary equipment and buildings Tanks 241 AP 102 and 241 AP 104 will provide waste feed for immobilization into a low activity waste (LAW) product (i.e. glass logs) The total effective dose equivalent (TEDE) to the offsite maximally exposed individual (MEI) from the construction activities is 0 045 millirem per year The unabated TEDE to the offsite ME1 from operation of the mixer pumps is 0 042 millirem per year.« less

  10. GOES data-collection system instrumentation, installation, and maintenance manual

    USGS Publications Warehouse

    Blee, J.W.; Herlong, H.E.; Kaufmann, C.D.; Hardee, J.H.; Field, M.L.; Middelburg, R.F.

    1986-01-01

    The purpose of the manual is to describe the installation, operation, and maintenance of Geostationary Operational Environmental Satellite (GOES) data collection platforms (DCP's) and associated equipment. This manual is not a substitute for DCP manufacturers ' manuals but is additional material that describes the application of data-collection platforms in the Water Resources Division. Power supplies, encoders, antennas, Mini Monitors, voltage analog devices, and the installation of these at streamflow-gaging stations are discussed in detail. (USGS)

  11. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  12. 40 CFR 63.11583 - What are my monitoring requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...

  13. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  14. A feasibility assessment of installation, operation and disposal options for nuclear reactor power system concepts for a NASA growth space station

    NASA Technical Reports Server (NTRS)

    Bloomfield, Harvey S.; Heller, Jack A.

    1987-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth space station architecture was conducted to address a variety of installation, operational disposition, and safety issues. A previous NASA sponsored study, which showed the advantages of space station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide the feasibility of each combination.

  15. EPA requirements and programs

    NASA Technical Reports Server (NTRS)

    Koutsandreas, J. D.

    1975-01-01

    The proposed ERTS-DCS system is designed to allow EPA the capability to evaluate, through demonstrable hardware, the effectiveness of automated data collection techniques. The total effectiveness of any system is dependent upon many factors which include equipment cost, installation, maintainability, logistic support, growth potential, flexibility and failure rate. This can best be accomplished by installing the system at an operational environmental control agency (CAMP station) to insure that valid data is being obtained and processed. Consequently, it is imperative that the equipment interface must not compromise the validity of the sensor data nor should the experimental system effect the present operations of the CAMP station. Since both the system which is presently in use and the automatic system would be in operation in parallel, conformation and comparison are readily obtained.

  16. Validation and performance of the LHC cryogenic system through commissioning of the first sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serio, L.; Bouillot, A.; Casas-Cubillos, J.

    2007-12-01

    The cryogenic system [1] for the Large Hadron Collider accelerator is presently in its final phase of commissioning at nominal operating conditions. The refrigeration capacity for the LHC is produced using eight large cryogenic plants and eight 1.8 K refrigeration units installed on five cryogenic islands. Machine cryogenic equipment is installed in a 26.7-km circumference ring deep underground tunnel and are maintained at their nominal operating conditions via a distribution system consisting of transfer lines, cold interconnection boxes at each cryogenic island and a cryogenic distribution line. The functional analysis of the whole system during all operating conditions was establishedmore » and validated during the first sector commissioning in order to maximize the system availability. Analysis, operating modes, main failure scenarios, results and performance of the cryogenic system are presented.« less

  17. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  18. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  19. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  20. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  1. 7 CFR 1753.68 - Purchasing special equipment.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...

  2. Evaluation of Microcomputer-Based Operation and Maintenance Management Systems for Army Water/Wastewater Treatment Plant Operation.

    DTIC Science & Technology

    1986-07-01

    COMPUTER-AIDED OPERATION MANAGEMENT SYSTEM ................. 29 Functions of an Off-Line Computer-Aided Operation Management System Applications of...System Comparisons 85 DISTRIBUTION 5V J. • 0. FIGURES Number Page 1 Hardware Components 21 2 Basic Functions of a Computer-Aided Operation Management System...Plant Visits 26 4 Computer-Aided Operation Management Systems Reviewed for Analysis of Basic Functions 29 5 Progress of Software System Installation and

  3. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as... detection system for each exhaust stack of the fabric filter. (2) Each bag leak detection system must be... specifications and recommendations. (3) The bag leak detection system must be certified by the manufacturer to be...

  4. Solar heating and hot water system installed at Alderson Broaddus College, Philippi, West Virginia

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Data needed necessary to evaluate the design and operation of a solar energy heating and hot water system installed in a commercial application are presented. The information includes system descriptions, acceptance test data, schematics, as built drawing, problems encountered, all solutions and photographs of the system at various stages of completion.

  5. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilkerson, Andrea; Sullivan, Gregory P.; Davis, Robert G.

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding themore » long-term performance of LED lighting systems in high-temperature environments.« less

  6. 14 CFR 25.1431 - Electronic equipment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... equipment and their installations, critical environmental conditions must be considered. (b) Radio and... electronic equipment, controls, and wiring must be installed so that operation of any one unit or system of...

  7. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements? (a) If you elect to install a CEMS as specified in Table 5 of this subpart, you must install... periodic data quality checks in accordance with 40 CFR part 60, appendix F, procedure 1. (3) As specified... you are required to install a continuous parameter monitoring system (CPMS) as specified in Table 5 of...

  8. Installation package for SIMS prototype system 2, solar hot water

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The prototype system 2 solar hot water was designed for use in a single family dwelling and consists of the following subsystems: collector, storage, energy transport, and control. Guidelines are presented for utilization in the development of detailed installation plans and specifications. Instruction on operation, maintenance, and repair of the system is discussed.

  9. Installation package for the Solaron solar subsystem

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  10. Performance and Health Test Procedure for Grid Energy Storage Systems: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali M; Smith, Kandler A; Friedl, Andrew

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: Round-trip efficiency, Standby losses, Response time/accuracy, and Useable Energy/ State of Charge at different discharge/charge rates over the system's lifetime. The procedures are divided into Reference Performance Tests, which require the system to be put in a test mode and are to be conducted in intervals, and Real-time Monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS withmore » little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.can be applied on a wide array of BESS with little modifications and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditures.« less

  11. DOE/NREL supported wind energy activities in Alaska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Drouilhet, S.

    1997-12-01

    This paper describes three wind energy projects implemented in Alaska. The first, a sustainable technology energy partnerships (STEP) wind energy deployment project in Kotzebue will install 6 AOC 15/50 wind turbines and connect to the existing village diesel grid, consisting of approximately 1 MW average load. It seeks to develop solutions to the problems of arctic wind energy installations (transport, foundations, erection, operation, and maintenance), to establish a wind turbine test site, and to establish the Kotzebue Electric Association as a training and deployment center for wind/diesel technology in rural Alaska. The second project, a large village medium-penetration wind/diesel system,more » also in Kotzebue, will install a 1-2 MW windfarm, which will supplement the AOC turbines of the STEP project. The program will investigate the impact of medium penetration wind energy on power quality and system stability. The third project, the Alaska high-penetration wind/diesel village power pilot project in Wales will install a high penetration (80-100%) wind/diesel system in a remote Alaskan village. The system will include about 180 kW installed wind capacity, meeting an average village load of about 60 kW. This program will provide a model for high penetration wind retrofits to village diesel power systems and build the capability in Alaska to operate, maintain, and replicate wind/diesel technology. The program will also address problems of: effective use of excess wind energy; reliable diesel-off operation; and the role of energy storage.« less

  12. A-1 Test Stand work

    NASA Technical Reports Server (NTRS)

    2010-01-01

    A structural steel beam to support the new thrust measurement system on the A-1 Test Stand at NASA's John C. Stennis Space Center is lifted to waiting employees for installation. The beam is part of the thrust takeout structure needed to support the new measurement system. Four such beams have been installed at the stand in preparation for installation of the system in upcoming weeks. Operators are preparing the stand for testing the next generation of rocket engines for the U.S. space program.

  13. An Open-source Meteorological Operational System and its Installation in Portuguese- speaking Countries

    NASA Astrophysics Data System (ADS)

    Almeida, W. G.; Ferreira, A. L.; Mendes, M. V.; Ribeiro, A.; Yoksas, T.

    2007-05-01

    CPTEC, a division of Brazil’s INPE, has been using several open-source software packages for a variety of tasks in its Data Division. Among these tools are ones traditionally used in research and educational communities such as GrADs (Grid Analysis and Display System from the Center for Ocean-Land-Atmosphere Studies (COLA)), the Local Data Manager (LDM) and GEMPAK (from Unidata), andl operational tools such the Automatic File Distributor (AFD) that are popular among National Meteorological Services. In addition, some tools developed locally at CPTEC are also being made available as open-source packages. One package is being used to manage the data from Automatic Weather Stations that INPE operates. This system uses only open- source tools such as MySQL database, PERL scripts and Java programs for web access, and Unidata’s Internet Data Distribution (IDD) system and AFD for data delivery. All of these packages are get bundled into a low-cost and easy to install and package called the Meteorological Data Operational System. Recently, in a cooperation with the SICLIMAD project, this system has been modified for use by Portuguese- speaking countries in Africa to manage data from many Automatic Weather Stations that are being installed in these countries under SICLIMAD sponsorship. In this presentation we describe the tools included-in and and architecture-of the Meteorological Data Operational System.

  14. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  15. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  16. 40 CFR 63.1184 - What do I need to know about the design specifications, installation, and operation of a bag leak...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., each compartment or cell must have a bag leak detector. For a negative-pressure or induced-air fabric... design specifications, installation, and operation of a bag leak detection system? 63.1184 Section 63.1184 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  17. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  18. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  19. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  20. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  1. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  2. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  3. Superfund Record of Decision (EPA Region 3): Allegany Ballistics Laboratory (USNavy), Operable Unit 1, Mineral, WV, February 12, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-01-01

    This decision document presents the selected remedial action for Site 5 Landfill Contents and Surface Soil at the Allegany Ballistics Laboratory (ABL), Rocket Center, West Virginia. The major components of the selected remedy are: Deed notation along with property use and limited access restrictions; Installation of a composite CAP-GCL and FMC; Installation of a drainage layer utilizing a geonet; Installation of a passive landfill gas (LFG) venting system; Revegetation of the capped area; Installation of perimeter drainage system; and Post-closure requirements.

  4. Safety Standard for Oxygen and Oxygen Systems: Guidelines for Oxygen System Design, Materials Selection, Operations, Storage, and Transportation

    NASA Technical Reports Server (NTRS)

    1996-01-01

    NASA's standard for oxygen system design, materials selection, operation, and transportation is presented. Minimum guidelines applicable to NASA Headquarters and all NASA Field Installations are contained.

  5. Video Information Communication and Retrieval/Image Based Information System (VICAR/IBIS)

    NASA Technical Reports Server (NTRS)

    Wherry, D. B.

    1981-01-01

    The acquisition, operation, and planning stages of installing a VICAR/IBIS system are described. The system operates in an IBM mainframe environment, and provides image processing of raster data. System support problems with software and documentation are discussed.

  6. 30 CFR 250.803 - Additional production system requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed in all enclosed classified areas. Gas sensors shall be installed in all inadequately ventilated, enclosed..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and...

  7. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... alarm system that will sound automatically when an increase in relative particulate matter emissions over a preset level is detected. The alarm must be located where it is easily heard by plant operating personnel. (7) For positive pressure fabric filter systems, a bag leak detection system must be installed in...

  8. Crime Prevention in Schools: Specification, Installation, and Maintenance of Intruder Alarm Systems. Building Bulletin 69.

    ERIC Educational Resources Information Center

    Haworth-Roberts, A., Ed.

    Greater use of expensive equipment by schools has also increased the potential for vandalism and theft, giving an increased role to intruder alarm systems. This document provides guidance on the management and technical aspects of forming policies for installing and operating intruder alarm systems in educational buildings. Also provided are…

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKegg, A.

    On February 6, 1987, Westinghouse Industry Services Queensland and Integrated Power Corporation (IPC) of Rockville, Maryland began their joint effort to design, build and install a hybrid photovoltaic/diesel power generation station. Installation began on June 1, 1987 and the system was operational on October 30, 1987. The system combines the quality, reliability and low operating costs of photovoltaics with the lower capital cost, high energy density and high efficiency at full load of diesel generators. The performance of the Coconut Island power system has been an unquestioned success. Power availability has exceeded 99 percent, a level comparable with local utilities.more » Energy capacity has not only met projections, but the system's flexibility has allowed energy output to be increased 40 percent beyond design level to accommodate the Islanders' enthusiastic demand for power. The power describes the design, performance, installation, and acceptance of the hybrid system. A table lists technical applications.« less

  10. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  11. 46 CFR 181.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... installation must be in accordance with the Marine Design, Installation, Operation, and Maintenance Manual...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  12. Development of process control capability through the Browns Ferry Integrated Computer System using Reactor Water Clanup System as an example. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, J.; Mowrey, J.

    1995-12-01

    This report describes the design, development and testing of process controls for selected system operations in the Browns Ferry Nuclear Plant (BFNP) Reactor Water Cleanup System (RWCU) using a Computer Simulation Platform which simulates the RWCU System and the BFNP Integrated Computer System (ICS). This system was designed to demonstrate the feasibility of the soft control (video touch screen) of nuclear plant systems through an operator console. The BFNP Integrated Computer System, which has recently. been installed at BFNP Unit 2, was simulated to allow for operator control functions of the modeled RWCU system. The BFNP Unit 2 RWCU systemmore » was simulated using the RELAP5 Thermal/Hydraulic Simulation Model, which provided the steady-state and transient RWCU process variables and simulated the response of the system to control system inputs. Descriptions of the hardware and software developed are also included in this report. The testing and acceptance program and results are also detailed in this report. A discussion of potential installation of an actual RWCU process control system in BFNP Unit 2 is included. Finally, this report contains a section on industry issues associated with installation of process control systems in nuclear power plants.« less

  13. 75 FR 65151 - Marine Vapor Control Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ...The Coast Guard proposes to increase maritime domain safety by revising existing safety regulations for facility and vessel vapor control systems (VCSs). The proposed changes would make VCS requirements more compatible with new Federal and State environmental requirements, reflect industry advancements in VCS technology, and codify the standards for the design and operation of a VCS at tank barge cleaning facilities. These changes would increase the safety of operations by regulating the design, installation, and use of VCSs, but would not require anyone to install or use VCSs.

  14. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The progress of the program during the sixth program quarter is reported. The program calls for the development and delivery of eight prototype solar heating and cooling systems for installation and operational test. The William O'Brien single-family heating system was installed and is operational. The New Castle single-family heating residence is under construction. The Kansas University (KU) system is in the final design stages. The 25 ton cooling subsystem for KU is the debugging stage. Pressure drops that were greater than anticipated were encountered. The 3 ton simulation work is being finalized and the design parameters for the Rankine system were determined from simulation output.

  15. Case study of a central-station grid-intertie photovoltaic system with V-trough concentration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freilich, J.; Gordon, J.M.

    1991-01-01

    This presentation is a cast study of an installed, central-station (no storage), utility-intertie photovoltaic (PV) system in Sede Boqer, Israel (latitude 30.9{degree}N). The nominally 12 kW peak PV system is comprised of 189 polycrystalline silicon modules mounted on inexpensive, one-axis north-south horizontal trackers with V-trough mirrors for optical boost. The power conditioning unit operates at a fixed voltage rather than at maximum power point (MPP). The primary task in analyzing the installed system was to investigate the cause of measured power output significantly below the design predictions of the installers, and to recommend system design modifications. Subsequent tasks included themore » quantitative assessment of fixed-voltage operation and of the energetic value of V-trough concentration and one-axis tracking for this system. Sample results show: (1) fixed-voltage operation at the best fixed voltage (BFV) can achieve around 96% of the yearly energy of MPP operation; (2) the sensitivity of the yearly energy delivery to the selection of fixed voltage and its marked asymmetry about the BFV; (3) the influences of inverter current constraints on yearly energy delivery and BFV; and (4) how the separate effects of tracking and optical concentration increase yearly energy delivery.« less

  16. Performance history and upgrades for the DIII-D gyrotron complex

    DOE PAGES

    Lohr, J.; Anderson, J. P.; Cengher, M.; ...

    2015-03-12

    The gyrotron installation on the DIII-D tokamak has been in operation at the second harmonic of the electron cyclotron resonance since the mid-1990s. Prior to that a large installation of ten 60 GHz tubes was operated at the fundamental resonance. The system has been upgraded regularly and is an everyday tool for experiments on DIII-D.

  17. Meeting the challenges of installing a mobile robotic system

    NASA Technical Reports Server (NTRS)

    Decorte, Celeste

    1994-01-01

    The challenges of integrating a mobile robotic system into an application environment are many. Most problems inherent to installing the mobile robotic system fall into one of three categories: (1) the physical environment - location(s) where, and conditions under which, the mobile robotic system will work; (2) the technological environment - external equipment with which the mobile robotic system will interact; and (3) the human environment - personnel who will operate and interact with the mobile robotic system. The successful integration of a mobile robotic system into these three types of application environment requires more than a good pair of pliers. The tools for this job include: careful planning, accurate measurement data (as-built drawings), complete technical data of systems to be interfaced, sufficient time and attention of key personnel for training on how to operate and program the robot, on-site access during installation, and a thorough understanding and appreciation - by all concerned - of the mobile robotic system's role in the security mission at the site, as well as the machine's capabilities and limitations. Patience, luck, and a sense of humor are also useful tools to keep handy during a mobile robotic system installation. This paper will discuss some specific examples of problems in each of three categories, and explore approaches to solving these problems. The discussion will draw from the author's experience with on-site installations of mobile robotic systems in various applications. Most of the information discussed in this paper has come directly from knowledge learned during installations of Cybermotion's SR2 security robots. A large part of the discussion will apply to any vehicle with a drive system, collision avoidance, and navigation sensors, which is, of course, what makes a vehicle autonomous. And it is with these sensors and a drive system that the installer must become familiar in order to foresee potential trouble areas in the physical, technical, and human environment.

  18. Solar heating and domestic hot water system installed at North Dallas High School

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at the North Dallas High School, Dallas, Texas is discussed. The system is designed as a retrofit in a three story with basement, concrete frame high school building. Extracts from the site files, specification references for solar modification to existing building heating and domestic hot water systems, drawings, installation, operation and maintenance instructions are included.

  19. Solar hot water space heating system. Technical progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Dam, T

    1979-08-13

    A retrofit solar heating system was installed on Madison Hall at Jordan College, Cedar Springs, Michigan. The system provides heating and domestic water preheating for a campus dormitory. Freeze protection is provided by a draindown system. The building and solar system, construction progress, and design changes are described. Included in appendices are: condensate trap design, structural analysis, pictures of installation, operating instructions, maintenance instructions, and as-built drawings. (MHR)

  20. 40 CFR 63.746 - Standards: Depainting operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., or paragraph (c) where organic HAP are controlled using a control system. This section does not apply... filter system, three-stage filter system, or other control system equivalent to the three-stage filter... operation shall be reduced by the use of a control system. Each control system that was installed before the...

  1. 40 CFR 63.746 - Standards: Depainting operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., or paragraph (c) where organic HAP are controlled using a control system. This section does not apply... filter system, three-stage filter system, or other control system equivalent to the three-stage filter... operation shall be reduced by the use of a control system. Each control system that was installed before the...

  2. 40 CFR 63.746 - Standards: Depainting operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., or paragraph (c) where organic HAP are controlled using a control system. This section does not apply... filter system, three-stage filter system, or other control system equivalent to the three-stage filter... operation shall be reduced by the use of a control system. Each control system that was installed before the...

  3. 40 CFR 63.746 - Standards: Depainting operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., or paragraph (c) where organic HAP are controlled using a control system. This section does not apply... filter system, three-stage filter system, or other control system equivalent to the three-stage filter... operation shall be reduced by the use of a control system. Each control system that was installed before the...

  4. Design, installation and operating experience of 20 photovoltaic medical refrigerator systems on four continents

    NASA Technical Reports Server (NTRS)

    Hein, G. F.

    1982-01-01

    The NASA Lewis Research Center in cooperation with the World Health Organization, U.S.A. I.D., the Pan American Health Organization and national government agencies in some developing countries sponsored the installation of twenty photovoltaic powered medical vaccine storage refrigerator-freezer (R/F) systems. The Solar Power Corporation was selected as the contractor to perform the design, development and installation of these twenty units. Solar Power's experiences are described herein.

  5. An Evaluation Methodology for Protocol Analysis Systems

    DTIC Science & Technology

    2007-03-01

    Main Memory Requirement NS: Needham-Schroeder NSL: Needham-Schroeder-Lowe OCaml : Objective Caml POSIX: Portable Operating System...methodology is needed. A. PROTOCOL ANALYSIS FIELD As with any field, there is a specialized language used within the protocol analysis community. Figure...ProVerif requires that Objective Caml ( OCaml ) be installed on the system, OCaml version 3.09.3 was installed. C. WINDOWS CONFIGURATION OS

  6. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  7. 47 CFR 22.383 - In-building radiation systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false In-building radiation systems. 22.383 Section... MOBILE SERVICES Operational and Technical Requirements Technical Requirements § 22.383 In-building radiation systems. Licensees may install and operate in-building radiation systems without applying for...

  8. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If a gas...) of this section. (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the...

  9. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... temperature sensor system from electromagnetic interference and chemical contaminants. (iv) If a gas...) of this section. (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the...

  10. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  11. 46 CFR 118.410 - Fixed gas fire extinguishing systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with the Marine Design, Installation, Operation, and Maintenance Manual approved for the system by the...), must be at least Schedule 80 (extra heavy). (2) A pressure relief valve or equivalent set to relieve at... installed in a machinery space, paint locker, a space containing flammable liquid stores, or a space with a...

  12. 78 FR 22802 - Airworthiness Directives; the Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... indication system and wiring on each engine; and repetitive operational checks of that installation to detect... wiring. Installation of a second locking gearbox 754 work-hours x $85 per hour = $0 $64,090 system. $64... proposed AD would require replacing certain relays and relay sockets, and doing wiring changes. For certain...

  13. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  14. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  15. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  16. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  17. 10 CFR 34.75 - Records of alarm system and entrance control checks at permanent radiographic installations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Records of alarm system and entrance control checks at permanent radiographic installations. 34.75 Section 34.75 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping...

  18. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  19. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  20. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  1. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  2. 47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...

  3. The implementation of physical safety system in bunker of the electron beam accelerator

    NASA Astrophysics Data System (ADS)

    Ahmad, M. A.; Hashim, S. A.; Ahmad, A.; Leo, K. W.; Chulan, R. M.; Dalim, Y.; Baijan, A. H.; Zain, M. F.; Ros, R. C.

    2017-01-01

    This paper describes the implementation of physical safety system for the new low energy electron beam (EB) accelerator installed at Block 43T Nuclear Malaysia. The low energy EB is a locally designed and developed with a target energy of 300 keV. The issues on radiation protection have been addressed by the installation of radiation shielding in the form of a bunker and installation radiation monitors. Additional precaution is needed to ensure that personnel are not exposed to radiation and other physical hazards. Unintentional access to the radiation room can cause serious hazard and hence safety features must be installed to prevent such events. In this work we design and built a control and monitoring system for the shielding door. The system provides signals to the EB control panel to allow or prevent operation. The design includes limit switches, key-activated switches and emergency stop button and surveillance camera. Entry procedure is also developed as written record and for information purposes. As a result, through this safety implementation human error will be prevented, increase alertness during operation and minimizing unnecessary radiation exposure.

  4. Missouri commercial vehicle operations : state business plan

    DOT National Transportation Integrated Search

    1998-05-15

    This business plan is intended to assist this state in improving its commercial vehicle operation regulation, guide the deployment and installation of intelligent transportation systems and to implement these systems in an efficient and cost effectiv...

  5. 40 CFR 63.3968 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...

  6. 40 CFR 63.3968 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: (1) For a thermal oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer...) For a catalytic oxidizer, install gas temperature monitors upstream and/or downstream of the catalyst... the requirements in paragraphs (a) and (c)(3)(i) through (v) of this section for each gas temperature...

  7. 40 CFR 63.3557 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (ii) of this section for each gas temperature monitoring device. (i) Locate the temperature sensor in... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i...

  8. 40 CFR 63.4967 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if...

  9. 40 CFR 63.4967 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor in the gas stream immediately before the catalyst bed, and if...

  10. 40 CFR 63.3557 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (ii) of this section for each gas temperature monitoring device. (i) Locate the temperature sensor in... oxidizer, install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct... oxidizer, install a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i...

  11. Vehicle Support Posts Installation at Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  12. ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience

    NASA Astrophysics Data System (ADS)

    Koveshnikov, A.; Bylinskii, I.; Hodgson, G.; Kishi, D.; Laxdal, R.; Ma, Y.; Nagimov, R.; Yosifov, D.

    2015-12-01

    The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience.

  13. 49 CFR 236.504 - Operation interconnected with automatic block-signal system.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GOVERNING THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Train Stop, Train Control and Cab Signal Systems Standards § 236.504... or train control system shall operate in connection with an automatic block signal system and shall...

  14. Unit undergoes controls upgrade to meet cycling needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weston, B.; Tinkham, R.; Chloupek, J.

    1994-04-01

    New England Electric System's Brayton Point Unit 3, Somerset, Mass, along with many other units in the US, has been forced into cycling operation on a much more frequent basis than was intended when the original controls were installed. Low-load operation and lengthy startup times also had to be addressed. An integrated control and monitoring system installed at Unit 3 to handle the boiler/turbine controls, burner management, and equipment monitoring functions. New strategies, particularly with the startup valves, were implemented to provide faster, safer, and more economical startups. The retrofit has been a success, with marked improvement in both startupmore » and operation.« less

  15. Weigh-in-Motion systems evaluation : final report.

    DOT National Transportation Integrated Search

    1976-04-01

    This relatively short-term project was initiated in order to perfect installation, operation, and maintenance practices necessary for continued accurate and reliable operation of a computerized Weigh-in-Motion system which will be used to gather truc...

  16. A photovoltaic power system in the remote African village of Tangaye, Upper Volta

    NASA Technical Reports Server (NTRS)

    Bifano, W. J.; Ratajczak, A. F.; Martz, J. E.

    1979-01-01

    A photovoltaic (PV) system powering a grain mill and a water pump was installed in the remote West African village of Tangaye, Upper Volta. Village characteristics as well as system design, hardware, installation and operation to date are described. The PV system cost is discussed. A baseline socio-economic study performed and a follow-up study is planned to determine the impact of the system on the villagers.

  17. Installation package for integrated programmable electronic controller and hydronic subsystem - solar heating and cooling

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description is given of the Installation, Operation, and Maintenance Manual and information on the power panel and programmable microprocessor, a hydronic solar pump system and a hydronic heating hot water pumping system. These systems are integrated into various configurations for usages in solar energy management, control and monitoring, lighting control, data logging and other solar related applications.

  18. Solar Water Heater Installation Package

    NASA Technical Reports Server (NTRS)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  19. FIELD DEMONSTRATION OF THE LINDE OXYGEN COMBUSTION SYSTEM ON THE EPA MOBILE INCINERATOR

    EPA Science Inventory

    This paper summarizes the various system performance tests and the long-term operating experience of the LINDE Oxygen Combustion System installed on the U.S. Environmental Protection Agency's Mobile Incineration System (MIS) when it was in operation at the Denney Farm site in sou...

  20. Federal Emergency Management Information System (FEMIS) system administration guide. Version 1.3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burford, M.J.; Burnett, R.A.; Downing, T.R.

    The Federal Emergency Management Information System (FEMIS) is an emergency management planning and analysis tool that was developed by the (Pacific Northwest National Laboratory) (PNNL) under the direction of the U.S. Army Chemical Biological Defense Command. The FEMIS System Administration Guide defines FEMIS hardware and software requirements and gives instructions for installing the FEMIS software package. 91 This document also contains information on the following: software installation for the FEMIS data servers, communication server, mail server, and the emergency management workstations; distribution media loading and FEMIS installation validation and troubleshooting; and system management of FEMIS users, login, privileges, and usage.more » The system administration utilities (tools), available in the FEMIS client software, are described for user accounts and site profile. This document also describes the installation and use of system and database administration utilities that will assist in keeping the FEMIS system running in an operational environment.« less

  1. 49 CFR 236.207 - Electric lock on hand-operated switch; control.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.207 Electric lock on hand-operated... 49 Transportation 4 2011-10-01 2011-10-01 false Electric lock on hand-operated switch; control...

  2. 46 CFR 61.35-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... equipment must be tested and inspected to verify their proper design, construction, installation, and operation. (d) All tests must be performed after installation of the automatic auxiliary boiler and its... monitored system conditions by misadjustment, artificial signals, improper wiring, tampering, or revision of...

  3. Results from a Field Trial of the Radio Frequency Based Cylinder Accountability and Tracking System at the Global Nuclear Fuel Americas Fuel Fabrication Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fitzgerald, Peter; Laughter, Mark D; Martyn, Rose

    The Cylinder Accountability and Tracking System (CATS) is a tool designed for use by the International Atomic Energy Agency (IAEA) to improve overall inspector efficiency through real-time unattended monitoring of cylinder movements, site specific rules-based event detection, and the capability to integrate many types of monitoring technologies. The system is based on the tracking of cylinder movements using (radio frequency) RF tags, and the collection of data, such as accountability weights, that can be associated with the cylinders. This presentation will cover the installation and evaluation of the CATS at the Global Nuclear Fuels (GNF) fuel fabrication facility in Wilmington,more » NC. This system was installed to evaluate its safeguards applicability, operational durability under operating conditions, and overall performance. An overview of the system design and elements specific to the GNF deployment will be presented along with lessons learned from the installation process and results from the field trial.« less

  4. INSTALLATION OF A POST-ACCIDENT CONFINEMENT HIGH-LEVEL RADIATION MONITORING SYSTEM IN THE KOLA NUCLEAR POWER STATION (UNIT 2) IN RUSSIA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    GREENE,G.A.; GUPPY,J.G.

    1998-09-01

    This is the final report on the INSP project entitled, ``Post-Accident Confinement High-Level Radiation Monitoring System'' conducted by BNL under the authorization of Project Work Plan WBS 1.2.2.6 (Attachment 1). This project was initiated in February 1993 to assist the Russians in reducing risks associated with the continued operation of older Soviet-designed nuclear power plants, specifically the Kola VVER-440/230 Unit 2, through improved accident detection capability, specifically by the installation of a dual train high-level radiation detection system in the confinement of Unit 2 of the Kola NPP. The major technical objective of this project was to provide, install andmore » make operational the necessary hardware inside the confinement of the Kola NPP Unit 2 to provide early and reliable warning of the release of radionuclides from the reactor into the confinement air space as an indication of the occurrence of a severe accident at the plant. In addition, it was intended to provide hands-on experience and training to the Russian plant workers in the installation, operation, calibration and maintenance of the equipment in order that they may use the equipment without continued US assistance as an effective measure to improve reactor safety at the plant.« less

  5. 49 CFR 393.69 - Liquefied petroleum gas systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Protection Association, Battery March Park, Quincy, MA 02269, as follows: (1) A fuel system installed before... ACCESSORIES NECESSARY FOR SAFE OPERATION Fuel Systems § 393.69 Liquefied petroleum gas systems. (a) A fuel system that uses liquefied petroleum gas as a fuel for the operation of a motor vehicle or for the...

  6. Problems associated with operations and measurement in cryogenic wind tunnels

    NASA Technical Reports Server (NTRS)

    Blanchard, A.; Delcourt, V.; Plazanet, M.

    1986-01-01

    Cryogenic wind tunnel T'3 under continuous blower operation has been the object of improvements and the installation of auxiliary equipment, dealing in particular with the enlargement of the liquid nitrogen injection reservoir and the hook-up to a fast data acquisition system. Following a brief description of the installation and its functioning, we present the main experimental techniques and the instrumentation used in the cryogenic environment.

  7. Solar heating system installed at Stamford, Connecticut

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The solar heating system installed at the Lutz-Sotire Partnership Executive East Office Building, Stamford, Connecticut is described. The Executive East Office Building is of moderate size with 25,000 sq ft of heated space in 2 1/2 stories. The solar system was designed to provide approximately 50 percent of the heating requirements. The system components are described. Appended data includes: the system design acceptance test, the operation and maintenance manual, and as-built drawings and photographs.

  8. Statement of Work Electrical Energy Storage System Installation at Sandia National Laboratories.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schenkman, Benjamin L.

    2017-03-01

    Sandia is seeking to procure a 1 MWh energy storage system. It will be installed at the existing Energy Storage Test Pad, which is located at Sandia National Laboratories in Albuquerque, New Mexico. This energy storage system will be a daily operational system, but will also be used as a tool in our Research and development work. The system will be part of a showcase of Sandia distributed energy technologies viewed by many distinguished delegates.

  9. Solar heating, cooling and domestic hot water system installed at Columbia Gas System Service Corporation, Columbus, Ohio

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system installed in the building has 2,978 sq ft of single axis tracking, concentrating collectors and provides solar energy for space heating, space cooling and domestic hot water. A 1,200,000 Btu/hour water tube gas boiler provides hot water for space heating. Space cooling is provided by a 100 ton hot water fired absorption chiller. Domestic hot water heating is provided by a 50 gallon natural gas domestic storage water heater. Extracts from the site files, specification references, drawings, installation, operation and maintenance instructions are included.

  10. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, has been installed on the south side of the high bay. In view below are several levels of previously installed platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. WORKING PARK-FUEL CELL COMBINED HEAT AND POWER SYSTEM

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allan Jones

    2003-09-01

    This report covers the aims and objectives of the project which was to design, install and operate a fuel cell combined heat and power (CHP) system in Woking Park, the first fuel cell CHP system in the United Kingdom. The report also covers the benefits that were expected to accrue from the work in an understanding of the full technology procurement process (including planning, design, installation, operation and maintenance), the economic and environmental performance in comparison with both conventional UK fuel supply and conventional CHP and the commercial viability of fuel cell CHP energy supply in the new deregulated energymore » markets.« less

  12. Hybrid Configuration of Darrieus and Savonius Rotors for Stand-alone Power Systems

    NASA Astrophysics Data System (ADS)

    Wakui, Tetsuya; Tanzawa, Yoshiaki; Hashizume, Takumi; Nagao, Toshio

    The suitable hybrid configuration of Darrieus lift-type and Savonius drag-type rotors for stand-alone wind turbine-generator systems is discussed using our dynamic simulation model. Two types of hybrid configurations are taken up: Type-A installs the Savonius rotor inside the Darrieus rotor and Type-B installs the Savonius rotor outside the Darrieus rotor. The computed results of the output characteristics and the dynamic behaviors of the system operated at the maximum power coefficient points show that Type-A, which has fine operating behavior to wind speed changes and can be compactly designed because of a shorter rotational shaft, is an effective way for self-controlled stand-alone small-scale systems.

  13. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  14. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  15. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  16. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  17. 47 CFR 74.634 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... control system must be designed, installed, and protected so that the transmitter can only be activated or... ensure proper operation. (3) The remote control system must be designed to prevent inadvertent...

  18. Liquefied Petroleum Gas Monitoring System Based on Polystyrene Coated Long Period Grating

    PubMed Central

    Zotti, Aldobenedetto; Palumbo, Giovanna; Zuppolini, Simona; Consales, Marco; Cutolo, Antonello; Borriello, Anna; Zarrelli, Mauro; Iadicicco, Agostino

    2018-01-01

    In this work, we report the in-field demonstration of a liquefied petroleum gas monitoring system based on optical fiber technology. Long-period grating coated with a thin layer of atactic polystyrene (aPS) was employed as a gas sensor, and an array comprising two different fiber Bragg gratings was set for the monitoring of environmental conditions such as temperature and humidity. A custom package was developed for the sensors, ensuring their suitable installation and operation in harsh conditions. The developed system was installed in a real railway location scenario (i.e., a southern Italian operative railway tunnel), and tests were performed to validate the system performances in operational mode. Daytime normal working operations of the railway line and controlled gas expositions, at very low concentrations, were the searched realistic conditions for an out-of-lab validation of the developed system. Encouraging results were obtained with a precise indication of the gas concentration and external conditioning of the sensor. PMID:29734731

  19. 77 FR 44110 - Special Conditions: Agusta S.p.A. Model AW139 and AB139 Helicopter, Installation of a Search and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-27

    ... must comply with the following: (i) The hoist operator control must be designed and located to provide... failures affecting the control system must be evaluated. (ii) The AFCS must be designed so that it cannot... Helicopter, Installation of a Search and Rescue (SAR) Automatic Flight Control System (AFCS) AGENCY: Federal...

  20. The UNIX Operating System in Libraries: Advantages of LAN's and Bulletin Board Systems in Your Library.

    ERIC Educational Resources Information Center

    Rose, Phillip E.

    1988-01-01

    Describes the experiences of the AT&T Technical Library in installing a local area network (LAN) and bulletin board using the UNIX operating system. Reasons why a LAN was needed, how the system works, and hardware and software used are discussed. (1 reference) (MES)

  1. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...

  2. 40 CFR 63.9306 - What are my continuous parameter monitoring system (CPMS) installation, operation, and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Hazardous Air Pollutants for Engine Test Cells/Stands General Compliane Requirements § 63.9306... at all times that an engine test cell/stand is operating, except during monitoring malfunctions... engine test cell/stand is operating. You must inspect the automatic shutdown system at least once every...

  3. Logistics hardware and services control system

    NASA Technical Reports Server (NTRS)

    Koromilas, A.; Miller, K.; Lamb, T.

    1973-01-01

    Software system permits onsite direct control of logistics operations, which include spare parts, initial installation, tool control, and repairable parts status and control, through all facets of operations. System integrates logistics actions and controls receipts, issues, loans, repairs, fabrications, and modifications and assets in predicting and allocating logistics parts and services effectively.

  4. Halon Gas and Library Fire Protection.

    ERIC Educational Resources Information Center

    Pacey, Antony

    1991-01-01

    Describes the operation of halon gas fire extinguishing systems, which have been installed in a number of libraries and archives across Canada where protection of special collections from water and mold damage resulting from operation of a standard water sprinkler system is paramount. The advantages and disadvantages of this type of system are…

  5. 40 CFR 76.10 - Alternative emission limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...; and (ii) The installed NOX emission control system has been designed to meet the applicable emission... that the unit and NOX emission control system were operated in accordance with the bid and design specifications on which the design of the NOX emission control system was based; and (C) Unit operating data as...

  6. 40 CFR 76.10 - Alternative emission limitations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; and (ii) The installed NOX emission control system has been designed to meet the applicable emission... that the unit and NOX emission control system were operated in accordance with the bid and design specifications on which the design of the NOX emission control system was based; and (C) Unit operating data as...

  7. 75 FR 38945 - Airworthiness Directives; The Boeing Company Model 777-200 and -300 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ..., 2006. The service bulletin describes procedures for installing new operational software in the cabin... loading the new cabin services system central storage device software and CSCP OPS into the MMC. FAA's... cabin services system central storage device software and cabin system control panel operational...

  8. Flight-test evaluation of civil helicopter terminal approach operations using differential GPS

    NASA Technical Reports Server (NTRS)

    Edwards, F. G.; Hegarty, D. M.

    1989-01-01

    A civil code differential Global Positioning System (DGPS) has been developed and flight-tested by the NASA Ames Research Center. The system was used to evaluate the performance of the DGPS for support of helicopter terminal approach operations. The airborne component of the DGPS was installed in a NASA helicopter. The ground-reference component was installed in a mobile van and equipped with a real-time VHF telemetry data link to transmit correction information to the aircraft system. An extensive series of tests was conducted to evaluate the performance of the system for several different configurations of the airborne navigation filter. This paper will describe the systems, the results of the flight tests, and the results of the posttest analysis.

  9. High temperature process steam application at the Southern Union Refining Company, Hobbs, New Mexico. Solar energy in the oil patch. Final report, Phase III: operation, maintenance, and performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, L.E.; McGuire, D.R.

    1984-05-01

    This final report summarizes the technical reports for Phase III of this project. The third phase included the operation, maintenance, upgrade and performance reporting of a 10,080 square foot Solar Industrial Process Heat System installed at the Famariss Energy Refinery of Southern Union Refining Company near Hobbs, New Mexico. This report contains a description of the upgraded system, and a summary of the overall operation, maintenance and performance of the installed system. The results of the upgrade activities can be seen in the last two months of operational data. Steam production was significantly greater in peak flow and monthly totalmore » than at any previous time. Also monthly total cost savings was greatly improved even though natural gas costs remain much lower than originally anticipated.« less

  10. AVOSS Windline at Dallas/Ft. Worth Airport Volume 1 Installation and Operation

    DOT National Transportation Integrated Search

    2001-05-01

    A 259-meter windline, with horizontal and vertical single-axis anemometers mounted on 9-meter poles, was installed at the Dallas/Ft. Worth Airport under the approach to Runway 17C, as part of NASA's Aircraft Vortex Spacing System (AVOSS) development ...

  11. Analysis of the harmonics and power-factor effects at a utility-inertied photovoltaic system

    NASA Astrophysics Data System (ADS)

    Campen, G. L.

    The harmonics and power factor characteristics and effects of a single residential photovoltaic (PV) installation using a line commutated inverter are outlined. The data were taken during a 5 day measurement program at a prototype residential PV installation in Arizona. The magnitude and phase of various currents and voltages from the fundamental to the 13th harmonic were recorded both with and without the operation of the PV system. A candidate method of modeling the installation for computer studies of larger concentrations is given.

  12. 30 CFR 250.442 - What are the requirements for a subsea BOP system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...

  13. 30 CFR 250.442 - What are the requirements for a subsea BOP system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...

  14. 30 CFR 250.442 - What are the requirements for a subsea BOP system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...

  15. 30 CFR 250.442 - What are the requirements for a subsea BOP system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.442 What are the requirements for a subsea BOP system? When you drill with a subsea BOP system, you must install the BOP system...

  16. Evaluation of installed solar systems at Navy, Army, and Air Force Bases. Final report, October 1984-September 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durlak, E.R.

    1986-05-01

    This report presents a summary of the results of site-evaluation inspection conducted at Navy, Army, and Air Force base. The solar systems evaluated included space heating, space cooling, and domestic hot water system. The systems range in size from small two-collector systems to large arrays installed on barracks, mess halls, office buildings, etc. These operational results are presented so that future designs will benefit from the lesson learned in this study.

  17. 77 FR 70159 - New York Independent System Operator, Inc.; Notice Establishing Comment Date To Respond to Motion...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... of Time On November 9, 2012, New York Independent System Operator, Inc. (NYISO) filed a motion requesting a 2-month extension of time (motion), until February 15, 2013, to submit its annual Installed...

  18. Solar Access to Public Capital (SAPC) Working Group: Best Practices in PV System Installation; Version 1.0, March 2015; Period of Performance, October 2014 - September 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Doyle, C.; Truitt, A.; Inda, D.

    The following Photovoltaics Installation Best Practices Guide is one of several work products developed by the Solar Access to Public Capital (SAPC) working group, which works to open capital market investment. SAPC membership includes over 450 leading solar developers, financiers and capital managers, law firms, rating agencies, accounting and engineering firms, and other stakeholders engaged in solar asset deployment. SAPC activities are directed toward foundational elements necessary to pool project cash flows into tradable securities: standardization of power purchase and lease contracts for residential and commercial end customers; development of performance and credit data sets to facilitate investor due diligencemore » activities; comprehension of risk perceived by rating agencies; and the development of best practice guides for PV system installation and operations and maintenance (O&M) in order to encourage high-quality system deployment and operation that may improve lifetime project performance and energy production. This PV Installation Best Practices Guide was developed through the SAPC Installation Best Practices subcommittee, a subgroup of SAPC comprised of a wide array of solar industry leaders in numerous fields of practice. The guide was developed over roughly one year and eight months of direct engagement by the subcommittee and two working group comment periods.« less

  19. Method and apparatus for energy efficient self-aeration in chemical, biochemical, and wastewater treatment processes

    DOEpatents

    Gao, Johnway [Richland, WA; Skeen, Rodney S [Pendleton, OR

    2002-05-28

    The present invention is a pulse spilling self-aerator (PSSA) that has the potential to greatly lower the installation, operation, and maintenance cost associated with aerating and mixing aqueous solutions. Currently, large quantities of low-pressure air are required in aeration systems to support many biochemical production processes and wastewater treatment plants. Oxygen is traditionally supplied and mixed by a compressor or blower and a mechanical agitator. These systems have high-energy requirements and high installation and maintenance costs. The PSSA provides a mixing and aeration capability that can increase operational efficiency and reduce overall cost.

  20. 10 CFR 431.242 - Test Procedures [Reserved

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...

  1. 10 CFR 431.242 - Test Procedures [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... upstream of the draft control device of an individual, automatically operated, fossil fuel-fired appliance... intended for installation in the venting system of an individual, automatically operated, fossil fuel-fired...

  2. Solar space and water heating system installed at Charlottesville, Virginia

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy system located at David C. Wilson Neuropsychiatric Hospital, Charlottesville, Virginia, is described. The solar energy system consists of 88 single glazed, Sunworks 'Solector' copper base plate collector modules, hot water coils in the hot air ducts, a Domestic Hot Water (DHW) preheat tank, a 3,000 gallon concrete urethane insulated storage tank and other miscellaneous components. Extracts from the site files, specifications, drawings, installation, operation and maintenance instructions are included.

  3. Final system instrumentation design package for Decade 80 solar house

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The final configuration of the Decade 80 solar house to monitor and collect system performance data is presented. A review demonstrated by actual operation that the system and the data acquisition subsystem operated satisfactorily and installation of instrumentation was in accordance with the design. This design package is made up of (1) site and system description, (2) operating and control modes, and (3) instrumentation program (including sensor schematic).

  4. Solar hot water system installed at Quality Inn, Key West, Florida

    NASA Astrophysics Data System (ADS)

    1980-04-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  5. Solar hot water system installed at Quality Inn, Key West, Florida

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The solar energy hot water system installed in the Quality Inn, Key West, Florida, which consists of four buildings is described. Three buildings are low-rise, two-story buildings containing 100 rooms. The fourth is a four-story building with 48 rooms. The solar system was designed to provide approximately 50 percent of the energy required for the domestic hot water system. The solar system consists of approximately 1400 square feet of flat plate collector, two 500 gallon storage tanks, a circulating pump, and a controller. Operation of the system was begun in April 1978, and has continued to date with only three minor interruptions for pump repair. In the first year of operation, it was determined that the use of the solar facility resulted in forty percent fuel savings.

  6. Solar residential heating and cooling system development test program

    NASA Technical Reports Server (NTRS)

    Humphries, W. R.; Melton, D. E.

    1974-01-01

    A solar heating and cooling system is described, which was installed in a simulated home at Marshall Space Flight Center. Performance data are provided for the checkout and initial operational phase for key subsystems and for the total system. Valuable information was obtained with regard to operation of a solar cooling system during the first summer of operation. Areas where improvements and modifications are required to optimize such a system are discussed.

  7. 16 CFR 1211.13 - Inherent force activated secondary door sensors.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...

  8. 16 CFR 1211.13 - Inherent force activated secondary door sensors.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...

  9. 16 CFR 1211.13 - Inherent force activated secondary door sensors.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... sensors. 1211.13 Section 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT... § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...

  10. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pressure or induced air fabric filters, the bag leak detector must be installed downstream of the fabric... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air...

  11. Shipboard CCTV for Globe-Girdling Students.

    ERIC Educational Resources Information Center

    Anderton, Ray L.

    1983-01-01

    Describes installation, operation, and educational benefits of a closed circuit television system installed on a ship used for the "Semester at Sea" program. The program, jointly sponsored by the University of Pittsburgh and the Institute of Shipboard Education, provides undergraduates with the opportunity to pursue studies on a…

  12. Energy and water quality management systems for water utility's operations: a review.

    PubMed

    Cherchi, Carla; Badruzzaman, Mohammad; Oppenheimer, Joan; Bros, Christopher M; Jacangelo, Joseph G

    2015-04-15

    Holistic management of water and energy resources is critical for water utilities facing increasing energy prices, water supply shortage and stringent regulatory requirements. In the early 1990s, the concept of an integrated Energy and Water Quality Management System (EWQMS) was developed as an operational optimization framework for solving water quality, water supply and energy management problems simultaneously. Approximately twenty water utilities have implemented an EWQMS by interfacing commercial or in-house software optimization programs with existing control systems. For utilities with an installed EWQMS, operating cost savings of 8-15% have been reported due to higher use of cheaper tariff periods and better operating efficiencies, resulting in the reduction in energy consumption of ∼6-9%. This review provides the current state-of-knowledge on EWQMS typical structural features and operational strategies and benefits and drawbacks are analyzed. The review also highlights the challenges encountered during installation and implementation of EWQMS and identifies the knowledge gaps that should motivate new research efforts. Copyright © 2015 Elsevier Ltd. All rights reserved.

  13. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers on the deck of the mobile launcher prepare the platforms for installation of vehicle support posts at NASA's Kennedy Space Center in Florida. At left, four of the support posts are installed. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  14. INFLUENCES OF HVAC DESIGN AND OPERATION ON RADON MITIGATION OF EXISTING SCHOOL BUILDINGS

    EPA Science Inventory

    The paper discusses various school building characteristics identified as influencing radon entry, the design and operation of installed mitigation systems in four Maryland schools, and the success of these systems in reducing school radon levels. Several public school buildings ...

  15. The Financial Impact of Using TMR in a Private Group Practice

    PubMed Central

    Templeton, Joan; Bernes, Marshall; Ostrowski, Maureen

    1982-01-01

    The installation of a computerized financial system is usually preceded by a cost-benefit analysis showing a positive impact on the facility's financial picture. The administration expects reduction in some operating costs (exclusive of the system and the installation costs) and an improvement in collecting accounts receivable. When California Primary Physicians installed TMR, certain costs were reduced, and the business office did become more efficient. However, because TMR is an integrated medical/financial system, other financial benefits accrued to the practice that billing systems would never be able to provide. This paper discusses the financial impact of TMR on cost reduction, accounts receivable collection, revenue tracking, and program development and marketing.

  16. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane lifts the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  17. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Four vehicle support posts have been installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  18. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lowers the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, for installation on the south side of High Bay 3 in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  19. Impact of PID on industrial rooftop PV-installations

    NASA Astrophysics Data System (ADS)

    Buerhop, Claudia; Fecher, Frank W.; Pickel, Tobias; Patel, Tirth; Zetzmann, Cornelia; Camus, Christian; Hauch, Jens; Brabec, Christoph J.

    2017-08-01

    Potential induced degradation (PID) causes severe damage and financial losses even in modern PV-installations. In Germany, approximately 19% of PV-installations suffer from PID and resulting power loss. This paper focuses on the impact of PID in real installations and how different evaluated time intervals influence the performance ratio (PR) and the determined degradation rate. The analysis focuses exemplarily on a 314 kWp PV-system in the Atlantic coastal climate. IR-imaging is used for identifying PID without operation interruption. Historic electric performance data are available from a monitoring system for several years on system level, string level as well as punctually measured module string IV- curves. The data sets are combined for understanding the PID behavior of this PV plant. The number of PID affected cells within a string varies strongly between 1 to 22% with the string position on the building complex. With increasing number of PID-affected cells the performance ratio decreases down to 60% for daily and monthly periods. Local differences in PID evolution rates are identified. An average PR-reduction of -3.65% per year is found for the PV-plant. On the string level the degradation rate varied up to 8.8% per year depending on the string position and the time period. The analysis reveals that PID generation and evolution in roof-top installations on industrial buildings with locally varying operation conditions can be fairly complex. The results yield that local operating conditions, e.g. ambient weather conditions as well as surrounding conditions on an industrial building, seem to have a dominating impact on the PID evolution rate.

  20. Design of a steganographic virtual operating system

    NASA Astrophysics Data System (ADS)

    Ashendorf, Elan; Craver, Scott

    2015-03-01

    A steganographic file system is a secure file system whose very existence on a disk is concealed. Customarily, these systems hide an encrypted volume within unused disk blocks, slack space, or atop conventional encrypted volumes. These file systems are far from undetectable, however: aside from their ciphertext footprint, they require a software or driver installation whose presence can attract attention and then targeted surveillance. We describe a new steganographic operating environment that requires no visible software installation, launching instead from a concealed bootstrap program that can be extracted and invoked with a chain of common Unix commands. Our system conceals its payload within innocuous files that typically contain high-entropy data, producing a footprint that is far less conspicuous than existing methods. The system uses a local web server to provide a file system, user interface and applications through a web architecture.

  1. Integrated propulsion/energy transfer control systems for lift-fan V/STOL aircraft. [reduction of total propulsion system and control system installation requirements

    NASA Technical Reports Server (NTRS)

    Deckert, W. H.; Rolls, L. S.

    1974-01-01

    An integrated propulsion/control system for lift-fan transport aircraft is described. System behavior from full-scale experimental and piloted simulator investigations are reported. The lift-fan transport is a promising concept for short-to-medium haul civil transportation and for other missions. The lift-fan transport concept features high cruise airspeed, favorable ride qualities, small perceived noise footprints, high utilization, transportation system flexibility, and adaptability to VTOL, V/STOL, or STOL configurations. The lift-fan transport has high direct operating costs in comparison to conventional aircraft, primarily because of propulsion system and aircraft low-speed control system installation requirements. An integrated lift-fan propulsion system/aircraft low-speed control system that reduces total propulsion system and control system installation requirements is discussed.

  2. Solar heating and cooling system design and development

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The development of eight prototype solar heating and combined heating and cooling systems is reported. Manufacture, test, installation, maintenance, problem resolution, and monitoring the operation of prototype systems is included. Heating and cooling equipment for single family residential and commercial applications and eight operational test sites (four heating and four heating and cooling) is described.

  3. Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-05-16

    The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.

  4. Solar hot water system installed at Anderson, South Carolina

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A description is given of the solar energy hot water system installed in the Days Inns of America, Inc., at Anderson, South Carolina. The building is a low-rise, two-story 114-room motel. The solar system was designed to provide 40 percent of the total hot water demand. The collector is a flat plate, liquid with an area of 750 square feet. Operation of this system was begun in November 1977, and has performed flawlessly for one year.

  5. Operational test report -- Project W-320 cathodic protection systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowman, T.J.

    1998-06-16

    Washington Administrative Code (WAC) 173-303-640 specifies that corrosion protection must be designed into tank systems that treat or store dangerous wastes. Project W-320, Waste Retrieval Sluicing System (WRSS), utilizes underground encased waste transfer piping between tanks 241-C-106 and 241-AY-102. Corrosion protection is afforded to the encasements of the WRSS waste transfer piping through the application of earthen ionic currents onto the surface of the piping encasements. Cathodic protection is used in conjunction with the protective coatings that are applied upon the WRSS encasement piping. WRSS installed two new two rectifier systems (46 and 47) and modified one rectifier system (31).more » WAC 173-303-640 specifies that the proper operation of cathodic protection systems must be confirmed within six months after initial installation. The WRSS cathodic protection systems were energized to begin continuous operation on 5/5/98. Sixteen days after the initial steady-state start-up of the WRSS rectifier systems, the operational testing was accomplished with procedure OTP-320-006 Rev/Mod A-0. This operational test report documents the OTP-320-006 results and documents the results of configuration testing of integrated piping and rectifier systems associated with the W-320 cathodic protection systems.« less

  6. 77 FR 9518 - Airworthiness Directives; The Boeing Company Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ...) Installation of New Relay and Wiring Bundle Within 72 months after the effective date of this AD: Change the... and temperature control system (CACTCS). This AD requires doing certain wiring changes, installing a new relay and necessary wiring in the CACTCS, and performing an operational test of the cooling pack...

  7. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (a) You must classify all areas according to API RP 500, Recommended Practice for Classification of... Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... and hazards of electrical equipment. (c) You must install all electrical systems according to API RP...

  8. Optimal Operation and Dispatch of Voltage Regulation Devices Considering High Penetrations of Distributed Photovoltaic Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mather, Barry A; Hodge, Brian S; Cho, Gyu-Jung

    Voltage regulation devices have been traditionally installed and utilized to support distribution voltages. Installations of distributed energy resources (DERs) in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile for a feeder; therefore, in the distribution system planning stage of the optimal operation and dispatch of voltage regulation devices, possible high penetrations of DERs should be considered. In this paper, we model the IEEE 34-bus test feeder, including all essential equipment. An optimization method is adopted to determine the optimal siting and operation ofmore » the voltage regulation devices in the presence of distributed solar power generation. Finally, we verify the optimal configuration of the entire system through the optimization and simulation results.« less

  9. The Closed Orbit Measurement System at the DELTA Synchrotron Radiation Facility And First Investigations Concerning the Installation of a Beam Based BPM Calibration System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jankowiak, A.; Wille, K.; /Dortmund U. /SLAC

    2011-08-25

    For a synchrotron radiation source it is necessary to operate a monitoring system to determine the beam position with high resolution and accuracy with respect to the axis of the quadrupole magnets. In this paper the present closed orbit measurement system of the DELTA SR-Facility, concerning the hardware setup, data processing and the calibration methods, will be presented. The results of the calibration measurements and the recent operating experience will be discussed. These results show, that the system is close to the design resolution. But the BPM offsets with respect to the magnetic center of the quadrupole magnets turn outmore » to be not acceptable. For some BPMs they are in the order of several 100 micro m. Therefore it was decided to install a beam based BPM calibration system in the near future . This system should allow to determine the BPM offsets relative to the center of the quadrupole magnets for all 40 BPMs. It is planned to install a system in order to change the focussing strength of each quadrupole individually either in a static or dynamic way.« less

  10. 47 CFR 73.875 - Modification of transmission systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... test operations at the full authorized ERP may commence immediately upon installation pursuant to § 73... the transmitter operating power (TPO) from the authorized value, but not the ERP, must be reported in...

  11. U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Ran; Feldman, David; Margolis, Robert

    This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less

  12. XpressWare Installation User guide

    NASA Astrophysics Data System (ADS)

    Duffey, K. P.

    XpressWare is a set of X terminal software, released by Tektronix Inc, that accommodates the X Window system on a range of host computers. The software comprises boot files (the X server image), configuration files, fonts, and font tools to support the X terminal. The files can be installed on one host or distributed across multiple hosts The purpose of this guide is to present the system or network administrator with a step-by-step account of how to install XpressWare, and how subsequently to configure the X terminals appropriately for the environment in which they operate.

  13. Review of stand-alone photovoltaic application projects sponsored by US DOE and US AID

    NASA Technical Reports Server (NTRS)

    Bifano, W. J.

    1981-01-01

    Experience with dc photovoltaic systems (without backup power) and ranging in output from 23 to 3,500 peak watts, in a wide range of environmental conditions and with a wide range of insolation, is described. Cooperation of NASA with other government agencies resulted in the installation of an air pollution monitor in New Jersey, a seismic sensor in Hawaii, power for lookout towers in national forests in California, an electric power system for a Papago Indian village in Arizona, and a power system for a grain mill and water pump in Tangaye, Upper Volta. Significant operational results are discussed and system reliability is assessed for the 20 experimental systems installed since 1976. Additional systems to be installed overseas are highlighted, and economic factors are considered.

  14. Evaluation Metrics for the Paragon XP/S-15

    NASA Technical Reports Server (NTRS)

    Traversat, Bernard; McNab, David; Nitzberg, Bill; Fineberg, Sam; Blaylock, Bruce T. (Technical Monitor)

    1993-01-01

    On February 17th 1993, the Numerical Aerodynamic Simulation (NAS) facility located at the NASA Ames Research Center installed a 224 node Intel Paragon XP/S-15 system. After its installation, the Paragon was found to be in a very immature state and was unable to support a NAS users' workload, composed of a wide range of development and production activities. As a first step towards addressing this problem, we implemented a set of metrics to objectively monitor the system as operating system and hardware upgrades were installed. The metrics were designed to measure four aspects of the system that we consider essential to support our workload: availability, utilization, functionality, and performance. This report presents the metrics collected from February 1993 to August 1993. Since its installation, the Paragon availability has improved from a low of 15% uptime to a high of 80%, while its utilization has remained low. Functionality and performance have improved from merely running one of the NAS Parallel Benchmarks to running all of them faster (between 1 and 2 times) than on the iPSC/860. In spite of the progress accomplished, fundamental limitations of the Paragon operating system are restricting the Paragon from supporting the NAS workload. The maximum operating system message passing (NORMA IPC) bandwidth was measured at 11 Mbytes/s, well below the peak hardware bandwidth (175 Mbytes/s), limiting overall virtual memory and Unix services (i.e. Disk and HiPPI I/O) performance. The high NX application message passing latency (184 microns), three times than on the iPSC/860, was found to significantly degrade performance of applications relying on small message sizes. The amount of memory available for an application was found to be approximately 10 Mbytes per node, indicating that the OS is taking more space than anticipated (6 Mbytes per node).

  15. 40 CFR 264.1101 - Design and operating standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... hazardous waste (e.g., upon detection of leakage from the primary barrier) the owner or operator must: (A... constituents into the barrier, and a leak detection system that is capable of detecting failure of the primary... requirements of the leak detection component of the secondary containment system are satisfied by installation...

  16. 30 CFR 250.430 - When must I install a diverter system?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 250.430 Mineral Resources MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter... before you drill a conductor or surface hole. The diverter system consists of a diverter sealing element...

  17. 40 CFR 142.307 - What terms and conditions must be included in a small system variance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that may affect proper and effective operation and maintenance of the technology; (2) Monitoring... effective installation, operation and maintenance of the applicable small system variance technology in... health, which may include: (i) Public education requirements; and (ii) Source water protection...

  18. Network Routing Using the Network Tasking Order, a Chron Approach

    DTIC Science & Technology

    2015-03-26

    57  Figure 4.6: Maximum bandwidth possible. ..................................................................... 58  Figure 4.7: MikroTik Router...iv xii RouterOS MikroTik Router Operating System...traffic through the network. Within the ESXi platform, four MikroTik Router Operating Systems (RouterOS) are installed. Within ESXi, the network

  19. 76 FR 12617 - Airworthiness Directives; The Boeing Company Model 777-200 and -300 Series Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... installing new operational software for the electrical load management system and configuration database... the electrical load management system operational software and configuration database software, in... Management, P.O. Box 3707, MC 2H-65, Seattle, Washington 98124-2207; telephone 206- 544-5000, extension 1...

  20. 78 FR 23866 - Airworthiness Directives; the Boeing Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ... operational software in the cabin management system, and loading new software into the mass memory card. The...-200 and -300 series airplanes. The proposed AD would have required installing new operational software in the cabin management system, and loading new software into the mass memory card. Since the...

  1. Natural Bridges National Monument photovoltaic power plant operations manual

    NASA Astrophysics Data System (ADS)

    Coleman, S. D.

    1982-02-01

    After a basic introduction and overview of the photovoltaic system at the Natural Bridges National Monument, a history of the project and a description of the installation, safety procedures essential for all operators and maintenance personnel are discussed. Locations and detailed descriptions of the equipment are provided to permit operators to identify the system controls and equipment. Step by step system operation procedures are described, including diesel generator start up and photovoltaic power system turn on. Information is provided about routine monitoring and maintenance of the system.

  2. FLOAT OPERATED RADIAL GATE INSTALLATION. WASTEWAY NO. 1. WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOAT OPERATED RADIAL GATE INSTALLATION. WASTEWAY NO. 1. WELLTON-MOHAWK CANAL - STA. 99+23.50. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2497, dated March 8, 1949, Denver Colorado. Sheet 1 of 7 - Wellton-Mohawk Irrigation System, Wasteway No. 1, Wellton-Mohawk Canal, North side of Wellton-Mohawk Canal, bounded by Gila River to North & the Union Pacific Railroad & Gila Mountains to south, Wellton, Yuma County, AZ

  3. 30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...

  4. 30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...

  5. 30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...

  6. 30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...

  7. 30 CFR 75.1101-16 - Dry powder chemical systems; sensing and fire-suppression devices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... sensing device installed in such system. (b) Where sensors are operated from the same power source as the belt drive, each sensor shall be equipped with a standby power source which shall be capable of remaining operative for at least 4 hours after a power cutoff. (c) Sensor systems shall include a warning...

  8. Control and protection system for an installation for the combined production of electrical and thermal energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agazzone, U.; Ausiello, F.P.

    1981-06-23

    A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less

  9. Renewable energy water supply - Mexico program summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Foster, R.

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importancemore » of training. It also presents much collected data as to the characteristics and performance of the installed systems.« less

  10. Orion Service Module Umbilical (OSMU) Installation on Mobile Launcher (ML)

    NASA Image and Video Library

    2017-03-13

    Cranes and rigging are being used to lift the bracket for the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower. The tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  11. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  12. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    Preparations are underway to lift the Orion Service Module Umbilical (OSMU) up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  13. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    Seeming to hang in midair, the Orion Service Module Umbilical (OSMU) is lifted high up by crane for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  14. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  15. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    A crane and rigging are used to lift the Orion Service Module Umbilical (OSMU) high up for installation on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  16. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare to install a vehicle support post. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  17. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, construction workers on the deck of the mobile launcher install the final four vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  18. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-25

    At NASA's Kennedy Space Center in Florida, the final four vehicle support posts are being installed on the deck of the mobile launcher. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  19. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Construction workers on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida, prepare a platform for installation of a vehicle support post. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  20. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    In view are three vehicle support posts installed on the deck of the mobile launcher at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  1. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lowers the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, into High Bay 3 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. In view below are several of the previously installed levels of platforms. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  2. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  3. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  4. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  5. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  6. 47 CFR 74.434 - Remote control operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Remote control operation. 74.434 Section 74.434 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES EXPERIMENTAL RADIO... functions to permit proper operation of the station. (b) A remote control system must be designed, installed...

  7. Flate-plate photovoltaic power systems handbook for Federal agencies

    NASA Technical Reports Server (NTRS)

    Cochrane, E. H.; Lawson, A. C.; Savage, C. H.

    1984-01-01

    The primary purpose is to provide a tool for personnel in Federal agencies to evaluate the viability of potential photovoltaic applications. A second objective is to provide descriptions of various photovoltaic systems installed by different Federal agencies under the Federal Photovoltaic Utilization Program so that other agencies may consider similar applications. A third objective is to share lessons learned to enable more effective procurement, design, installation, and operation of future photovoltaic systems. The intent is not to provide a complete handbook, but rather to provide a guide for Federal agency personnel with additional information incorporated by references. The steps to be followed in selecting, procuring, and installing a photovoltaic application are given.

  8. 40 CFR 60.2165 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... installed in each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag... test. (g) For waste-burning kilns not equipped with a wet scrubber, in place of hydrogen chloride..., maintain, and operate a continuous emission monitoring system for monitoring hydrogen chloride emissions...

  9. 16 CFR § 1211.13 - Inherent force activated secondary door sensors.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... sensors. § 1211.13 Section § 1211.13 Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER... Standard § 1211.13 Inherent force activated secondary door sensors. (a) Normal operation test. (1) A force activated door sensor of a door system installed according to the installation instructions shall actuate...

  10. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  11. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... structures, and their facilities. (a) You must classify all areas according to API RP 500, Recommended... Class I, Division 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations... according to API RP 14F, Recommended Practice for Design and Installation of Electrical Systems for Fixed...

  12. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  13. 30 CFR 250.114 - How must I install and operate electrical equipment?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... their facilities. (a) You must classify all areas according to API RP 500, Recommended Practice for... 1 and Division 2, or API RP 505, Recommended Practice for Classification of Locations for Electrical... electrical systems according to API RP 14F, Recommended Practice for Design and Installation of Electrical...

  14. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  15. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  16. 40 CFR 62.14690 - What monitoring equipment must I install and what parameters must I monitor?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... each baghouse compartment or cell. For negative pressure or induced air fabric filters, the bag leak... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS... subpart, you must install, calibrate, maintain, and continuously operate a bag leak detection system as...

  17. A feasibility assessment of nuclear reactor power system concepts for the NASA Growth Space Station

    NASA Technical Reports Server (NTRS)

    Bloomfield, H. S.; Heller, J. A.

    1986-01-01

    A preliminary feasibility assessment of the integration of reactor power system concepts with a projected growth Space Station architecture was conducted to address a variety of installation, operational, disposition and safety issues. A previous NASA sponsored study, which showed the advantages of Space Station - attached concepts, served as the basis for this study. A study methodology was defined and implemented to assess compatible combinations of reactor power installation concepts, disposal destinations, and propulsion methods. Three installation concepts that met a set of integration criteria were characterized from a configuration and operational viewpoint, with end-of-life disposal mass identified. Disposal destinations that met current aerospace nuclear safety criteria were identified and characterized from an operational and energy requirements viewpoint, with delta-V energy requirement as a key parameter. Chemical propulsion methods that met current and near-term application criteria were identified and payload mass and delta-V capabilities were characterized. These capabilities were matched against concept disposal mass and destination delta-V requirements to provide a feasibility of each combination.

  18. Solar heating and cooling demonstration project at the Florida solar energy center

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The retrofitted solar heating and cooling system installed at the Florida Solar Energy Center is described. The system was designed to supply approximately 70 percent of the annual cooling and 100 percent of the heating load. The project provides unique high temperature, nonimaging, nontracking, evacuated tube collectors. The design of the system was kept simple and employs five hydronic loops. They are energy collection, chilled water production, space cooling, space heating and energy rejection. Information is provided on the system's acceptance test results operation, controls, hardware and installation, including detailed drawings.

  19. Solar domestic hot water system installed at Texas City, Texas

    NASA Technical Reports Server (NTRS)

    1980-01-01

    This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.

  20. Research Plan of the Department of Systems Engineering and the Operations Research Center for the Academic Year 2006

    DTIC Science & Technology

    2005-09-01

    Facilities Layout o Scope problem with client in terms of options for M&S facilities layouts with regards to infrastructure, personnel... Facilities Layout o Develop M&S Installation Facilities Layout Design(s) Requirements and Milestones: • Scope problem with client (systems on which...objectives of this study are to (a) identify the desired technology and facilities layouts which would enhance inter-installation simulation

  1. 46 CFR 151.40-10 - Operational requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CARRYING BULK LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-10... visual high cargo temperature or high cargo pressure alarm which is discernible at the towboat. The alarm shall operate when either the pressure or the temperature exceeds the operating limits of the system...

  2. 46 CFR 151.40-10 - Operational requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CARRYING BULK LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-10... visual high cargo temperature or high cargo pressure alarm which is discernible at the towboat. The alarm shall operate when either the pressure or the temperature exceeds the operating limits of the system...

  3. 46 CFR 151.40-10 - Operational requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CARRYING BULK LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-10... visual high cargo temperature or high cargo pressure alarm which is discernible at the towboat. The alarm shall operate when either the pressure or the temperature exceeds the operating limits of the system...

  4. 46 CFR 151.40-10 - Operational requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CARRYING BULK LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-10... visual high cargo temperature or high cargo pressure alarm which is discernible at the towboat. The alarm shall operate when either the pressure or the temperature exceeds the operating limits of the system...

  5. The introduction of space technology power systems into developing countries

    NASA Technical Reports Server (NTRS)

    Roberts, Allen F.; Ratajczak, Anthony F.

    1989-01-01

    Between 1978 and 1984, NASA-Lewis was responsible for the design, fabrication, installation and operational support of 57 photovoltaic power systems in 27 countries. These systems were installed in locations not served by a central power system and ranged in size from 40 W for powering street lights to 29 kW for providing power to a complete village. Several of the system projects had socio/economic studies components that provided for an assessment of how the introduction of both electricity and a novel high technology power system affected the users and their society.

  6. View_SPECPR: Software for Plotting Spectra (Installation Manual and User's Guide, Version 1.2)

    USGS Publications Warehouse

    Kokaly, Raymond F.

    2008-01-01

    This document describes procedures for installing and using the 'View_SPECPR' software system to plot spectra stored in SPECPR (SPECtrum Processing Routines) files. The View_SPECPR software is comprised of programs written in IDL (Interactive Data Language) that run within the ENVI (ENvironment for Visualizing Images) image processing system. SPECPR files are used by earth-remote-sensing scientists and planetary scientists for storing spectra collected by laboratory, field, and remote sensing instruments. A widely distributed SPECPR file is the U.S. Geological Survey (USGS) spectral library that contains thousands of spectra of minerals, vegetation, and man-made materials (Clark and others, 2007). SPECPR files contain reflectance data and associated wavelength and spectral resolution data, as well as meta-data on the time and date of collection and spectrometer settings. Furthermore, the SPECPR file automatically tracks changes to data records through its 'history' fields. For more details on the format and content of SPECPR files, see Clark (1993). For more details on ENVI, see ITT (2008). This program has been updated using an ENVI 4.5/IDL7.0 full license operating on a Windows XP operating system and requires the installation of the iTools components of IDL7.0; however, this program should work with full licenses on UNIX/LINUX systems. This software has not been tested with ENVI licenses on Windows Vista or Apple Operating Systems.

  7. Geothermal Power Supply Systems around the World and in Russia: State of the Art and Future Prospects

    NASA Astrophysics Data System (ADS)

    Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.

    2018-05-01

    Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined geothermal and solar heat supply system with an installed thermal power capacity of 5 MW that is in operation in the Rozovyi settlement, Krasnodar krai, is described. In the summer time, the solar installation with a capacity of 115 kW is used for supplying hot water to residential houses and for restoring the geothermal well pore pressure. The basic process circuit and characteristics of the geothermal heat supply system with the installed thermal power capacity of 8.7 MW operating in the Khankala settlement, the city of Groznyi, are given. The specific feature of this system is that the spent geothermal heat carrier is reinjected into a specially drilled inclined well. Advanced geothermal heat supply technologies involving reinjection of the spent geothermal heat carrier, combination with binary power units, use of heat pumps for recovering the spent heat carrier, and protection of equipment from corrosion and deposits are proposed.

  8. Installation and operation of a large scale RAPS system in Peru

    NASA Astrophysics Data System (ADS)

    Cole, J. F.

    In 1997, International Lead Zinc Research Organization Inc. (ILZRO), Solar Energy Industries Association (SEIA), and the Ministry of Energy and Mines (MEM) of Peru signed a Memorandum of Understanding to facilitate the installation of hybrid remote area power supply (RAPS) systems in the Amazon region of Peru. Many remote villages in this vast region have either no or limited electricity supplied by diesel generators running a few hours per day. Subsequently, ILZRO sponsored the engineering design of the hybrid RAPS system and SEIA supported a socio-economic study to determine the sustainability of such systems and the locations for pilot installations. In mid-1998, the Peruvian government approved the design of the system. ILZRO then began efforts to obtain governmental and inter-governmental funding to supplement its own funds to underwrite the cost of manufacture and installation of the systems in two villages in the Amazon region. Additional major funding has been received from the Global Environmental Facility (GEF) administered by the United Nations Development Program (UNDP) and from the Common Fund for Commodities (CFC). Funds have also been received from the US Department of Energy, the International Greenhouse Partnership (Australia) and the Peruvian government. The RAPS system consists of modules designed to provide 150 kW h per day of utility grade ac electricity over a 24 h period. Each module contains a diesel generator, battery bank using heavy-duty 2 V VRLA GEL batteries, a battery charger, a photovoltaic array and an ac/dc inverter. The batteries and electrical components are housed in modified shipping containers. The modules can be installed with a new generator or retrofitted to an existing generator. The charging and discharging regime of the batteries has been recommended by a study carried out by CSIRO, which has simulated the RAPS operation. The system will employ a partial-state-of-charge (PSOC) regime in order to optimize the life of the batteries, which have a projected life of 8-10 years. A remote monitoring system will consist of a satellite link between each of the remote area power systems and one or more central hosts. The system operator will be able to obtain actual operational status of the system and will be able to change set points and to force operation of certain functions in order to test the system. Preliminary cost analyses indicate that such RAPS systems are more economically attractive to provide electricity to remote villages than other alternatives, including 24 h diesel generation and grid extension. The past 5 years have provided a number of lessons learned, particularly related to dealing with government agencies in a developing country, overcoming logistical problems such as shipping long distances and dealing with difficult climate and terrain. Despite difficulties encountered, the promise of RAPS systems as a rapidly growing market for lead-acid batteries appears to be bright given the demand for sustainable remote electrification.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, William Eugene

    These slides describe different strategies for installing Python software. Although I am a big fan of Python software development, robust strategies for software installation remains a challenge. This talk describes several different installation scenarios. The Good: the user has administrative privileges - Installing on Windows with an installer executable, Installing with Linux application utility, Installing a Python package from the PyPI repository, and Installing a Python package from source. The Bad: the user does not have administrative privileges - Using a virtual environment to isolate package installations, and Using an installer executable on Windows with a virtual environment. The Ugly:more » the user needs to install an extension package from source - Installing a Python extension package from source, and PyCoinInstall - Managing builds for Python extension packages. The last item referring to PyCoinInstall describes a utility being developed for the COIN-OR software, which is used within the operations research community. COIN-OR includes a variety of Python and C++ software packages, and this script uses a simple plug-in system to support the management of package builds and installation.« less

  10. Installation guidelines for solar heating system, single-family residence at William OBrien State Park, Stillwater, Minnesota

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Installation procedures for the single family residential solar heating system at the William O'Brien State Park, Stillwater, Minnesota, are presented. The system is a solar-assisted, hydronic-to-warm-air system with solar-assisted domestic water heating. It is composed of the following major components: liquid cooled flat plate collectors; water storage tank; passive solar-fired domestic water preheater; electric hot water heater; heat pump with electric backup; solar hot water coil unit; tube-and-shell heat exchanger, three pumps, and associated pipes and valving in an energy transport module; control system; and air-cooled heat purge unit. Installer guidelines are provided for each subsystem and includes testing and filling the system. Information is also given on the operating procedures, controls, caution requirements and routine and schedule maintenance.

  11. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  12. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  13. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure test the BOP... BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed since your...

  14. 30 CFR 250.447 - When must I pressure test the BOP system?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Blowout Preventer (bop) System Requirements § 250.447 When must I pressure... valves, inside BOP, and drill-string safety valve): (a) When installed; (b) Before 14 days have elapsed...

  15. 40 CFR 63.9804 - What are my monitoring system installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., wiring, power supply, and data acquisition and recording system that are compatible with the output... temperature CPMS that is used to monitor the combustion chamber temperature of a thermal oxidizer or the... where it is easily recognized by plant operating personnel. (6) For positive pressure fabric filter...

  16. 40 CFR 63.322 - Standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... at each opening at all times that the machine is operating. (b) The owner or operator of each new dry... articles to or from the machine, and shall keep the door closed at all other times. (d) The owner or... existing dry cleaning system and of each new transfer machine system and its ancillary equipment installed...

  17. 40 CFR 63.322 - Standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... at each opening at all times that the machine is operating. (b) The owner or operator of each new dry... articles to or from the machine, and shall keep the door closed at all other times. (d) The owner or... existing dry cleaning system and of each new transfer machine system and its ancillary equipment installed...

  18. Hydrologic Monitoring in the Deep Subsurface to Support Repository Performance

    NASA Astrophysics Data System (ADS)

    Hubbell, J. M.; Heath, G. L.; Scott, C. L.

    2007-12-01

    The INL has installed and operated several vadose and ground water monitoring systems in arid and humid sites to depths of about 200m. Some of these systems have been in continuous operation for over 12 years. It is important that the systems be physically robust, simple, yet versatile enough that it can operate for extended time periods with little or no maintenance. Monitoring instruments are frequently installed and run to characterize the site, collect data during site operation, and continue to run for long-term stewardship, necessitating sensors that can be maintained or serviced. Sensors are carefully chosen based on the perceived data requirements over the life of the site. An emphasis is given on direct measurements such as tensiometers (portable and advanced), neutron probe, drain gauge, temperature, wells or sampling for fluids and gases. Other complementary data can include using TDR/capacitance, radiation detectors, and larger scale geophysical techniques (3-d resistivity and EM) for volumetric measurements. Commercially available instruments may have to be modified for their use at greater depths, to allow multiple instruments in a single borehole or to perform the intended monitoring function. Access tubes (some open at the bottom) can be placed to allow insertion of multiple sensors (radiation, neutron and portable sensors/samplers), future drilling/sampling and to install new instruments at a later time. The installation techniques and backfill materials must be chosen and the measurement technique tested to ensure representative data collection for the parameters of interest. The data collection system can be linked to climatic data (precipitation, barometric pressure, snow depth, runoff, surface water sources) that may influence the site's subsurface hydrology. The instruments are then connected to a real-time automated data collection system that collect, stores, and provides access to the data. These systems have been developed that allow easy access, automatic data quality checks with notification, processing, and presentation of the data in real time through the web. The systems can be designed to manipulate/test the system remotely. Data from several sites will be presented showing that continuous monitoring is necessary to detect rapid changes in the deep vadose zone and ground water at fractured rock sites.

  19. Radio frequency tags systems to initiate system processing

    NASA Astrophysics Data System (ADS)

    Madsen, Harold O.; Madsen, David W.

    1994-09-01

    This paper describes the automatic identification technology which has been installed at Applied Magnetic Corp. MR fab. World class manufacturing requires technology exploitation. This system combines (1) FluoroTrac cassette and operator tracking, (2) CELLworks cell controller software tools, and (3) Auto-Soft Inc. software integration services. The combined system eliminates operator keystrokes and errors during normal processing within a semiconductor fab. The methods and benefits of this system are described.

  20. Architecting Integrated System Health Management for Airworthiness

    DTIC Science & Technology

    2013-09-01

    aircraft safety and reliability through condition-based maintenance [Miller et al., 1991]. With the same motivation, Integrated System Health Management...diagnostics and prognostics algorithms. 2.2.2 Health and Usage Monitoring System (HUMS) in Helicopters Increased demand for improved operational safety ...offshore shuttle helicopters traversing the petrol installations in the North Sea, and increased demand for improved operational safety and reduced

  1. Investigation of effect of propulsion system installation and operation on aerodynamics of an airbreathing hypersonic airplane at Mach 0.3 to 1.2

    NASA Technical Reports Server (NTRS)

    Cubbage, J. M.; Mercer, C. E.

    1977-01-01

    Results from an investigation of the effects of the operation of a combined turbojet/scramjet propulsion system on the longitudinal aerodynamic characteristics of a 1/60-scale hypersonic airbreathing launch vehicle configuration are presented. Decomposition products of hydrogen peroxide were used for simulation of the propulsion system exhaust.

  2. The Logistics Of Installing Pacs In An Existing Medical Center

    NASA Astrophysics Data System (ADS)

    Saarinen, Allan O.; Goodsitt, Mitchell M.; Loop, John W.

    1989-05-01

    A largely overlooked issue in the Picture Archiving and Communication Systems (PACS) area is the tremendous amount of site planning activity required to install such a system in an existing medical center. Present PACS equipment requires significant hospital real estate, specialized electrical power, cabling, and environmental controls to operate properly. Marshaling the hospital resources necessary to install PACS equipment requires many different players. The site preparation costs are nontrivial and usually include a number of hidden expenses. This paper summarizes the experience of the University of Washington Department of Radiology in installing an extensive digital imaging network (DIN) and PACS throughout the Department and several clinics in the hospital. The major logistical problems encountered at the University are discussed, a few recommendations are made, and the installation costs are documented. Overall, the University's site preparation costs equalled about seven percent (7%) of the total PACS equipment expenditure at the site.

  3. Wire position system to consistently measure and record the location change of girders following ground changes

    NASA Astrophysics Data System (ADS)

    Choi, H. J.; Lee, S. B.; Lee, H. G.; Y Back, S.; Kim, S. H.; Kang, H. S.

    2017-07-01

    Several parts that comprise the large scientific device should be installed and operated at the accurate three-dimensional location coordinates (X, Y, and Z) where they should be subjected to survey and alignment. The location of the aligned parts should not be changed in order to ensure that the electron beam parameters (Energy 10 GeV, Charge 200 pC, and Bunch Length 60 fs, Emittance X/Y 0.481 μm/0.256 μm) of PAL-XFEL (X-ray Free Electron Laser of the Pohang Accelerator Laboratory) remain stable and can be operated without any problems. As time goes by, however, the ground goes through uplift and subsidence, which consequently deforms building floors. The deformation of the ground and buildings changes the location of several devices including magnets and RF accelerator tubes, which eventually leads to alignment errors (∆X, ∆Y, and ∆Z). Once alignment errors occur with regard to these parts, the electron beam deviates from its course and beam parameters change accordingly. PAL-XFEL has installed the Hydrostatic Leveling System (HLS) to measure and record the vertical change of buildings and ground consistently and systematically and the Wire Position System (WPS) to measure the two dimensional changes of girders. This paper is designed to introduce the operating principle and design concept of WPS and discuss the current situation regarding installation and operation.

  4. System administrator`s guide to CDPS. Version 1.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Didier, B.T.; Portwood, M.H.

    The System Administrator`s Guide to CDPS is intended for those responsible for setting up and maintaining the hardware and software of a Common Mapping Standard (CMS) Date Production System (CDPS) installation. This guide assists the system administrator in performing typical administrative functions. It is not intended to replace the Ultrix Documentation Set that should be available for a DCPS installation. The Ultrix Documentation Set will be required to provide details on referenced Ultrix commands as well as procedures for performing Ultrix maintenance functions. There are six major sections in this guide. Section 1 introduces the system administrator to CDPS andmore » describes the assumptions that are made by this guide. Section 2 describes the CDPS platform configuration. Section 3 describes the platform preparation that is required to install the CDPS software. Section 4 describes the CPS software and its installation procedures. Section 5 describes the CDS software and its installation procedures. Section 6 describes various operation and maintenance procedures. Four appendices are also provided. Appendix A contains a list of used acronyms. Appendix B provides a terse description of common Ultrix commands that are used in administrative functions. Appendix C provides sample CPS and CDS configuration files. Appendix D provides a required list and a recommended list of Ultrix software subsets for installation on a CDPS platform.« less

  5. Pervious pavements - installation, operations and strength part 4 : Flexipave(R) (recycled rubber tires) systems.

    DOT National Transportation Integrated Search

    2011-08-01

    Pervious : pavement : systems : are : now : being : recognized : as : a : best : management : practice : by : the : Environmental : Protection : Agency : and : the : state : of : Florida. : The : pervious : concrete : system : is : designed : to : ha...

  6. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...

  7. Performance and Health Test Procedure for Grid Energy Storage Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baggu, Murali M; Smith, Kandler A; Friedl, Andrew

    A test procedure to evaluate the performance and health of field installations of grid-connected battery energy storage systems (BESS) is described. Performance and health metrics captured in the procedures are: round-trip efficiency, standby losses, response time/accuracy, and useable energy/state of charge at different discharge/charge rates over the system's lifetime. The procedures are divided into reference performance tests, which require the system to be put in a test mode and are to be conducted in intervals, and real-time monitoring tests, which collect data during normal operation without interruption. The procedures can be applied on a wide array of BESS with littlemore » modification and can thus support BESS operators in the management of BESS field installations with minimal interruption and expenditure. Simulated results based on a detailed system simulation of a prototype system are provided as guideline.« less

  8. Development and testing of a photometric method to identify non-operating solar hot water systems in field settings.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    He, Hongbo; Vorobieff, Peter V.; Menicucci, David

    2012-06-01

    This report presents the results of experimental tests of a concept for using infrared (IR) photos to identify non-operational systems based on their glazing temperatures; operating systems have lower glazing temperatures than those in stagnation. In recent years thousands of new solar hot water (SHW) systems have been installed in some utility districts. As these numbers increase, concern is growing about the systems dependability because installation rebates are often based on the assumption that all of the SHW systems will perform flawlessly for a 20-year period. If SHW systems routinely fail prematurely, then the utilities will have overpaid for grid-energymore » reduction performance that is unrealized. Moreover, utilities are responsible for replacing energy for loads that failed SHW system were supplying. Thus, utilities are seeking data to quantify the reliability of SHW systems. The work described herein is intended to help meet this need. The details of the experiment are presented, including a description of the SHW collectors that were examined, the testbed that was used to control the system and record data, the IR camera that was employed, and the conditions in which testing was completed. The details of the associated analysis are presented, including direct examination of the video records of operational and stagnant collectors, as well as the development of a model to predict glazing temperatures and an analysis of temporal intermittency of the images, both of which are critical to properly adjusting the IR camera for optimal performance. Many IR images and a video are presented to show the contrast between operating and stagnant collectors. The major conclusion is that the technique has potential to be applied by using an aircraft fitted with an IR camera that can fly over an area with installed SHW systems, thus recording the images. Subsequent analysis of the images can determine the operational condition of the fielded collectors. Specific recommendations are presented relative to the application of the technique, including ways to mitigate and manage potential sources of error.« less

  9. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, construction workers assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. SMART operational field test evaluation : dispatchers survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automaticscheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans toimplement ITS as a site for an operational field test. The purpo...

  11. 49 CFR 236.202 - Signal governing movements over hand-operated switch.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Automatic Block Signal Systems Standards § 236.202 Signal governing movements over hand...

  12. Hardware problems encountered in solar heating and cooling systems

    NASA Technical Reports Server (NTRS)

    Cash, M.

    1978-01-01

    Numerous problems in the design, production, installation, and operation of solar energy systems are discussed. Described are hardware problems, which range from simple to obscure and complex, and their resolution.

  13. 76 FR 78730 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... locations throughout the BNSF operating system. BNSF also claims that: (1) The performance of \\3/4... Restraint Measurement System (GRMS) testing of the concrete crossties has confirmed that the installation of...

  14. Remote control flare stack igniter for combustible gases

    NASA Technical Reports Server (NTRS)

    Ray, W. L.

    1972-01-01

    Device has been designed and developed for igniting nonrecoverable combustible gases and sustaining combustion of gases evolving from various gas vent stacks. Igniter is superior to existing systems because of simplicity of operation, low cost fabrication, installation, operational and maintainability features, and excellent reliability in all phases of required operations.

  15. 30 CFR 250.431 - What are the diverter design and installation requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.431 What are the diverter... wellhead configurations and at least 12 inches for floating drilling operations; (b) Use dual diverter...

  16. Electro-Osmotic Pulse Technology: A Novel Solution to Severe Water Intrusion Problems in Earth Covered Magazines

    DTIC Science & Technology

    2006-11-01

    The situation was deemed ideal for ElectroOsmotic Pulse (EOP) technology. A Return-on-Investment (ROI) study concluded that EOP is also the most...various steps in the EOP system installation: Figure 15 shows the chipping operation for installing a ¾-inch wide mixed metal-oxide coated titanium

  17. 40 CFR 63.3547 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i) If you...

  18. 40 CFR 63.3547 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section for each gas temperature monitoring device. (i) Locate the temperature sensor in a position that..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... a gas temperature monitor according to paragraph (c)(2)(i) or (ii) of this section. (i) If you...

  19. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used... “Local Protective Signaling Systems” (NFPA No. 72A-1967). (c) On unattended equipment the fire... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Automatic fire sensors and manual actuators...

  20. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used... “Local Protective Signaling Systems” (NFPA No. 72A-1967). (c) On unattended equipment the fire... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Automatic fire sensors and manual actuators...

  1. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used... “Local Protective Signaling Systems” (NFPA No. 72A-1967). (c) On unattended equipment the fire... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Automatic fire sensors and manual actuators...

  2. 30 CFR 75.1107-4 - Automatic fire sensors and manual actuators; installation; minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used... “Local Protective Signaling Systems” (NFPA No. 72A-1967). (c) On unattended equipment the fire... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Automatic fire sensors and manual actuators...

  3. Installation package maxi-therm S-101 heating module

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The installation, operation and maintenance of the Maxi-Therm S-101 Thermosypnon Heating Module is described. The Maxi-Therm S-101 is a packaged unit, complete with air filter, blower, electrical controls, and a thermosyphon liquid to air heat exchanger. It is intended for use in residential solar heating systems and can utilize off-peak electrical power.

  4. Operational management of offshore energy assets

    NASA Astrophysics Data System (ADS)

    Kolios, A. J.; Martinez Luengo, M.

    2016-02-01

    Energy assets and especially those deployed offshore are subject to a variety of harsh operational and environmental conditions which lead to deterioration of their performance and structural capacity over time. The aim of reduction of CAPEX in new installations shifts focus to operational management to monitor and assess performance of critical assets ensuring their fitness for service throughout their service life and also to provide appropriate and effective information towards requalification or other end of life scenarios, optimizing the OPEX. Over the last decades, the offshore oil & gas industry has developed and applied various approaches in operational management of assets through Structural Health and Condition Monitoring (SHM/CM) systems which can be, at a certain level, transferable to offshore renewable installations. This paper aims to highlight the key differences between offshore oil & gas and renewable energy assets from a structural integrity and reliability perspective, provide a comprehensive overview of different approaches that are available and applicable, and distinguish the benefits of such systems in the efficient operation of offshore energy assets.

  5. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    A construction worker on the deck of the mobile launcher welds a portion of a platform for installation of a vehicle support post at NASA's Kennedy Space Center in Florida. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  6. Vehicle Support Posts Installation onto Mobile Launcher

    NASA Image and Video Library

    2017-05-11

    Several heavy lift cranes surround the mobile launcher at NASA's Kennedy Space Center in Florida. Preparations are underway to lift a vehicle support post up and onto the mobile launcher for installation on the deck. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.

  7. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. In view below Platform C are several of the previously installed platforms. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. Large Tandemloc bars have been attached to the platform to keep it level during lifting and installation. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Orion Service Module Umbilical (OSMU) Installation

    NASA Image and Video Library

    2017-03-16

    Construction workers assist as a crane and rigging are used to position the Orion Service Module Umbilical (OSMU) for installation high up on the mobile launcher tower at NASA's Kennedy Space Center in Florida. The mobile launcher tower will be equipped with a number of lines, called umbilicals, that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The OSMU will be located high on the mobile launcher tower and, prior to launch, will transfer liquid coolant for the electronics and air for the Environmental Control System to the Orion service module that houses these critical systems to support the spacecraft. EM-1 is scheduled to launch in 2018. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  10. Shuttle Liquid Fly Back Booster Configuration Options

    NASA Technical Reports Server (NTRS)

    Healy, T. J., Jr.

    1998-01-01

    This paper surveys the basic configuration options available to a Liquid Fly Back Booster (LFBB), integrated with the Space Shuttle system. The background of the development of the LFBB concept is given. The influence of the main booster engine (BME) installations and the Fly Back Engine (FBE) installation on the aerodynamic configurations are also discussed. Limits on the LFBB configuration design space imposed by the existing Shuttle flight and ground elements are also described. The objective of the paper is to put the constrains and design space for an LFBB in perspective. The object of the work is to define LFBB configurations that significantly improve safety, operability, reliability and performance of the Shuttle system and dramatically lower operations costs.

  11. The acoustic streamflow-measuring system on the Columbia River at The Dalles, Oregon

    USGS Publications Warehouse

    Smith, Winchell; Hubbard, Larry L.; Laenen, Antonius

    1971-01-01

    Installation of this sytem, which is the first application of an AVM (acoustic velocity meter) in a large natural channel, was completed in April 1969. It has been in continuous operation since that date. Performance has been satisfactory, and similar installations at other key points in the Columbia River basin are now under consideration. This paper covers the general theory behind acoustic velocity meters, tracing development from earlier concepts to the present commercially available system. Conclusions are that the AVM can now be considered as an operational instrument which permits accurate gaging of river discharge at many sites where conventional stream-gaging procedures have proved to be unreliable.

  12. USAF solar thermal applications case studies

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The potential of solar energy technologies to meet mission related applications for process heat was investigated. The reduction of the dependence of military installations on fossil fuels by promoting the use of more abundant resources where liquid hydrocarbons and natural gas are now used is examined. The evaluation and utilization of renewable energy systems to provide process heat and space heating are emphasized. The application of thermal energy systems is divided into four steps: (1) investigation of the potential operational cost effectiveness of selected thermal technologies; (2) selection of a site and preliminary design of point focussing solar thermal plant; (3) construction and test of an engineering prototype; and (4) installation and operation of a solar thermal energy plant.

  13. Cost of installing and operating an electronic clinical decision support system for maternal health care: case of Tanzania rural primary health centres.

    PubMed

    Saronga, Happiness Pius; Dalaba, Maxwell Ayindenaba; Dong, Hengjin; Leshabari, Melkizedeck; Sauerborn, Rainer; Sukums, Felix; Blank, Antje; Kaltschmidt, Jens; Loukanova, Svetla

    2015-04-02

    Poor quality of care is among the causes of high maternal and newborn disease burden in Tanzania. Potential reason for poor quality of care is the existence of a "know-do gap" where by health workers do not perform to the best of their knowledge. An electronic clinical decision support system (CDSS) for maternal health care was piloted in six rural primary health centers of Tanzania to improve performance of health workers by facilitating adherence to World Health Organization (WHO) guidelines and ultimately improve quality of maternal health care. This study aimed at assessing the cost of installing and operating the system in the health centers. This retrospective study was conducted in Lindi, Tanzania. Costs incurred by the project were analyzed using Ingredients approach. These costs broadly included vehicle, computers, furniture, facility, CDSS software, transport, personnel, training, supplies and communication. These were grouped into installation and operation cost; recurrent and capital cost; and fixed and variable cost. We assessed the CDSS in terms of its financial and economic cost implications. We also conducted a sensitivity analysis on the estimations. Total financial cost of CDSS intervention amounted to 185,927.78 USD. 77% of these costs were incurred in the installation phase and included all the activities in preparation for the actual operation of the system for client care. Generally, training made the largest share of costs (33% of total cost and more than half of the recurrent cost) followed by CDSS software- 32% of total cost. There was a difference of 31.4% between the economic and financial costs. 92.5% of economic costs were fixed costs consisting of inputs whose costs do not vary with the volume of activity within a given range. Economic cost per CDSS contact was 52.7 USD but sensitive to discount rate, asset useful life and input cost variations. Our study presents financial and economic cost estimates of installing and operating an electronic CDSS for maternal health care in six rural health centres. From these findings one can understand exactly what goes into a similar investment and thus determine sorts of input modification needed to fit their context.

  14. Mobile Launcher

    NASA Image and Video Library

    2017-05-30

    A view of the mobile launcher (ML) taken from the "eyebrow" of the nearby Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The ML tower will be equipped with a number of lines, called umbilicals that will connect to the Space Launch System rocket and Orion spacecraft for Exploration Mission-1 (EM-1). The Orion Service Module Umbilical and Core State Forward Skirt Umbilical were recently installed on the ML. The Ground Systems Development and Operations Program is overseeing installation of the umbilicals.

  15. 75 FR 34205 - Petition for Waiver of Compliance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... completed. The City states that construction so far has focused on the installation of the vehicle detection system and upgraded signal electronics. Rail has also been removed from a non-operating streetcar system...

  16. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  17. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed... for halocarbon systems and UL 2127 for inert gas systems; (3) Identification of the computer program...

  18. 78 FR 42547 - Notice of Lodging of Proposed Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... flared, Shell will operate numerous monitoring systems and comply with several operating parameters to... compounds (``VOCs''), and hazardous air pollutants from the twelve flares it operates at its Deer Park facility. Shell has agreed to limit the waste gas it sends to its flares by installing and/or operating...

  19. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  20. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  1. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  2. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  3. 46 CFR 111.95-1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...

  4. SMART operational field test evaluation : scheduler survey report : final report

    DOT National Transportation Integrated Search

    1997-06-01

    The Suburban Mobility Authority for Regional Transportation (SMART) has installed an automatic scheduling and dispatch system (ASD) in Southeast Michigan in accordance with their plans to implement ITS as a site for an operational field test. The pur...

  5. Pi of the Sky full system and the new telescope

    NASA Astrophysics Data System (ADS)

    Mankiewicz, L.; Batsch, T.; Castro-Tirado, A.; Czyrkowski, H.; Cwiek, A.; Cwiok, M.; Dabrowski, R.; Jelínek, M.; Kasprowicz, G.; Majcher, A.; Majczyna, A.; Malek, K.; Nawrocki, K.; Obara, L.; Opiela, R.; Piotrowski, L. W.; Siudek, M.; Sokolowski, M.; Wawrzaszek, R.; Wrochna, G.; Zaremba, M.; Żarnecki, A. F.

    2014-12-01

    The Pi of the Sky is a system of wide field of view robotic telescopes, which search for short timescale astrophysical phenomena, especially for prompt optical GRB emission. The system was designed for autonomous operation, monitoring a large fraction of the sky to a depth of 12(m}-13({m)) and with time resolution of the order of 1 - 10 seconds. The system design and observation strategy were successfully tested with a prototype detector operational at Las Campanas Observatory, Chile from 2004-2009 and moved to San Pedro de Atacama Observatory in March 2011. In October 2010 the first unit of the final Pi of the Sky detector system, with 4 CCD cameras, was successfully installed at the INTA El Arenosillo Test Centre in Spain. In July 2013 three more units (12 CCD cameras) were commissioned and installed, together with the first one, on a new platform in INTA, extending sky coverage to about 6000 square degrees.

  6. Horizontal/Vertical Stock Fund Cost Comparison

    DTIC Science & Technology

    1974-08-01

    units. Installation Supply Division account and other instal- lation operated activities: Self -Service Supply Store, Clothing Initial...installation supply operations are the Self -Service Supply Center, Clothing Sales Store, Central Issue Facility, and Clothing Initial Issue Point. Stock- age...stocks, stocks for installation operated supply activities such as the Self Service Supply Store, Clothing Sales Store and

  7. Possibility of heat recovery from gray water in residential building

    NASA Astrophysics Data System (ADS)

    Mazur, Aleksandra; Słyś, Daniel

    2017-12-01

    Recovery of waste heat from gray water can be an interesting alternative to other energy saving systems in a building, including alternative energy sources. Mainly, due to a number of advantages including independence from weather conditions, small investment outlay, lack of user support, or a slight interference with the installation system. The purpose of this article is to present the financial effectiveness of installations which provide hot, usable water to a detached house, using a Drain Water Heat Recovery (DWHR) system depending on the number of system users and the various combinations of bathing time in the shower, which has an influence on the daily warm water demand in each of the considered options. The economic analysis of the adopted installation variants is based on the Life Cycle Cost (LCC) method, which is characterized by the fact that it also includes the operating costs in addition to the capital expenditure during the entire analysis period. For each case, the necessary devices were selected and the cost of their installation was estimated.

  8. Current status and future prospects of an automated sample exchange system PAM for protein crystallography

    NASA Astrophysics Data System (ADS)

    Hiraki, M.; Yamada, Y.; Chavas, L. M. G.; Matsugaki, N.; Igarashi, N.; Wakatsuki, S.

    2013-03-01

    To achieve fully-automated and/or remote data collection in high-throughput X-ray experiments, the Structural Biology Research Centre at the Photon Factory (PF) has installed PF automated mounting system (PAM) for sample exchange robots at PF macromolecular crystallography beamlines BL-1A, BL-5A, BL-17A, AR-NW12A and AR-NE3A. We are upgrading the experimental systems, including the PAM for stable and efficient operation. To prevent human error in automated data collection, we installed a two-dimensional barcode reader for identification of the cassettes and sample pins. Because no liquid nitrogen pipeline in the PF experimental hutch is installed, the users commonly add liquid nitrogen using a small Dewar. To address this issue, an automated liquid nitrogen filling system that links a 100-liter tank to the robot Dewar has been installed on the PF macromolecular beamline. Here we describe this new implementation, as well as future prospects.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murray, Robert C.

    Following the January 1980 earthquake that was felt at Lawrence Livermore National Laboratory (LLNL), a network of strong-motion accelerographs was installed at LLNL. Prior to the 1980 earthquake, there were no accelerographs installed. The ground motion from the 1980 earthquake was estimated from USGS instruments around the Laboratory to be between 0.2 – 0.3 g horizontal peak ground acceleration. These instruments were located at the Veterans Hospital, 5 miles southwest of LLNL, and in San Ramon, about 12 miles west of LLNL. In 2011, the Department of Energy (DOE) requested to know the status of our seismic instruments. We conductedmore » a survey of our instrumentation systems and responded to DOE in a letter. During this survey, it was found that the recorders in Buildings 111 and 332 were not operational. The instruments on Nova had been removed, and only three of the 10 NIF instruments installed in 2005 were operational (two were damaged and five had been removed from operation at the request of the program). After the survey, it was clear that the site seismic instrumentation had degraded substantially and would benefit from an overhaul and more attention to ongoing maintenance. LLNL management decided to update the LLNL seismic instrumentation system. The updated system is documented in this report.« less

  10. A novel smart lighting clinical testbed.

    PubMed

    Gleason, Joseph D; Oishi, Meeko; Simkulet, Michelle; Tuzikas, Arunas; Brown, Lee K; Brueck, S R J; Karlicek, Robert F

    2017-07-01

    A real-time, feedback-capable, variable spectrum lighting system was recently installed at the University of New Mexico Hospital to facilitate biomedical research on the health impacts of lighting. The system consists of variable spectrum troffers, color sensors, occupancy sensors, and computing and communication infrastructure, and is the only such clinical facility in the US. The clinical environment posed special challenges for installation as well as for ongoing maintenance and operations. Pilot studies are currently underway to evaluate the effectiveness of the system to regulate circadian phase in subjects with delayed sleep-wake phase disorder.

  11. Automated meteorological data from commercial aircraft via satellite: Present experience and future implications

    NASA Technical Reports Server (NTRS)

    Steinberg, R.

    1978-01-01

    A low-cost communications system to provide meteorological data from commercial aircraft, in neat real-time, on a fully automated basis has been developed. The complete system including the low profile antenna and all installation hardware weighs 34 kg. The prototype system was installed on a B-747 aircraft and provided meteorological data (wind angle and velocity, temperature, altitude and position as a function of time) on a fully automated basis. The results were exceptional. This concept is expected to have important implications for operational meteorology and airline route forecasting.

  12. 75 FR 63045 - Airworthiness Directives; BAE SYSTEMS (OPERATIONS) LIMITED Model BAe 146 and Avro 146-RJ Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... the fitting and wing structure. Checking the nuts with a suitable torque spanner to the specifications in the torque figures shown in Table 2. of the Accomplishment Instructions of BAE SYSTEMS (OPERATIONS... installed, and Doing either an ultrasonic inspection for damaged bolts or torque check of the tension bolts...

  13. A human operator simulator model of the NASA Terminal Configured Vehicle (TCV)

    NASA Technical Reports Server (NTRS)

    Glenn, F. A., III; Doane, S. M.

    1981-01-01

    A generic operator model called HOS was used to simulate the behavior and performance of a pilot flying a transport airplane during instrument approach and landing operations in order to demonstrate the applicability of the model to problems associated with interfacing a crew with a flight system. The model which was installed and operated on NASA Langley's central computing system is described. Preliminary results of its application to an investigation of an innovative display system under development in Langley's terminal configured vehicle program are considered.

  14. First operational experience with the HIE-Isolde helium cryogenic system including several RF cryo-modules

    NASA Astrophysics Data System (ADS)

    Guillotin, N.; Dupont, T.; Gayet, Ph; Pirotte, O.

    2017-12-01

    The High Intensity and Energy ISOLDE (HIE-ISOLDE) upgrade project at CERN includes the deployment of new superconducting accelerating structures operated at 4.5 K (ultimately of six cryo-modules) installed in series, and the refurbishing of the helium cryo-plant previously used to cool the ALEPH magnet during the operation of the LEP accelerator from 1989 to 2000. The helium refrigerator is connected to a new cryogenic distribution line, supplying a 2000-liter storage dewar and six interconnecting valve boxes (i.e jumper boxes), one for each cryo-module. After a first operation period with one cryo-module during six months in 2015, a second cryo-module has been installed and operated during 2016. The operation of the cryo-plant with these two cryo-modules has required significant technical enhancements and tunings for the compressor station, the cold-box and the cryogenic distribution system in order to reach nominal and stable operational conditions. The present paper describes the commissioning results and the lessons learnt during the operation campaign of 2016 together with the preliminary experience acquired during the 2017 operation phase with a third cryo-module.

  15. Hard metal exposures. Part 1: Observed performance of three local exhaust ventilation systems.

    PubMed

    Guffey, S E; Simcox, N; Booth, D W; Hibbard, R; Stebbins, A

    2000-04-01

    Not every ventilation system performs as intended; much can be learned when they do not. The purpose of this study was to compare observed initial performance to expected levels for three saw-reconditioning shop ventilation systems and to characterize the changes in performance of the systems over a one-year period. These three local exhaust ventilation systems were intended to control worker exposures to cobalt, cadmium, and chromium during wet grinding, dry grinding, and welding/brazing activities. Prior to installation the authors provided some design guidance based on Industrial Ventilation, a Manual of Recommended Practice. However, the authors had limited influence on the actual installation and operation and no line authority for the systems. In apparent efforts to cut costs and to respond to other perceived needs, the installed systems deviated from the specifications used in pressure calculations in many important aspects, including adding branch ducts, use of flexible ducts, the choice of fans, and the construction of some hoods. After installation of the three systems, ventilation measurements were taken to determine if the systems met design specifications, and worker exposures were measured to determine effectiveness. The results of the latter will be published as a companion article. The deviations from design and maintenance failures may have adversely affected performance. From the beginning to the end of the study period the distribution of air flow never matched the design specifications for the systems. The observed air flows measured within the first month of installation did not match the predicated design air flows for any of the systems, probably because of the differences between the design and the installed system. Over the first year of operation, hood air flow variability was high due to inadequate cleaning of the sticky process materials which rapidly accumulated in the branch ducts. Poor distribution of air flows among branch ducts frequently produced individual hood air flows that were far below specified design levels even when the total air flow through that system was more than adequate. To experienced practitioners, it is not surprising that deviations from design recommendations and poor maintenance would be associated with poor system performance. Although commonplace, such experiences have not been documented in peer-reviewed publications to date. This publication is a first step in providing that documentation.

  16. The Zond Victory Garden Phase 4 windfarm: A planning, installation, and performance case study. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, J.

    1994-07-01

    This is one of a series of reports that document the steps taken to plan and install a utility-scale windfarm and follow its energy production performance. The reports are intended to help utility planners and others better understand the issues involved in installing and operating a windfarm. This report describes the Zond Victory Garden Phase IV (VGIV) windfarm in the Tehachapi mountain region, 100 miles north of Los Angeles. The Victory Garden series of windfarms were planned and installed and are operated by Zond Systems, Inc. of Tehachapi, California. The VGIV installation, which became operational in stages from January throughmore » June 1990, consists of 98 Vestas V27--225 wind turbines. The total rated capacity is 22 MW with a projected annual average net energy production of 54.3 million kWh/yr, equivalent to an annual capacity factor of 0.28. This energy projection, based on extensive wind resource measurements and an average wind turbine availability of 97%, includes the effects of a number of operational loss factors. The report includes descriptions of the windfarm layout, the wind turbine component, and the electrical layout. Particular attention is paid to one of the most important issues in implementing a windfarm, namely, the wind resource assessment and its use in projecting and updating the expected annual-average energy production of the facility. Also included are details of the planning, construction, and commissioning of the windfarm along with a description of the operations and maintenance procedures employed.« less

  17. Field Demonstration of Active Desiccant Modules Designed to Integrate with Standard Unitary Rooftop Package Equipment - Final Report: Phase 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fischer, J

    2004-03-15

    This report summarizes the investigation of two active desiccant module (ADM) pilot site installations initiated in 2001. Both pilot installations were retrofits at existing facilities served by conventional heating, ventilating, and air-conditioning (HVAC) systems that had encountered frequent humidity control, indoor air quality (IAQ), and other operational problems. Each installation involved combining a SEMCO, Inc., ADM (as described in Fischer and Sand 2002) with a standard packaged rooftop unit built by the Trane Company. A direct digital control (DDC) system integral to the ADM performed the dual function of controlling the ADM/rooftop combination and facilitating data collection, trending, and remotemore » performance monitoring. The first installation involved providing preconditioned outdoor air to replace air exhausted from the large kitchen hood and bathrooms of a Hooters restaurant located in Rome, Georgia. This facility had previously added an additional rooftop unit in an attempt to achieve occupant comfort without success. The second involved conditioning the outdoor air delivered to each room of a wing of the Mountain Creek Inn at the Callaway Gardens resort. This hotel, designed in the ''motor lodge'' format with each room opening to the outdoors, is located in southwest Georgia. Controlling the space humidity always presented a serious challenge. Uncomfortable conditions and musty odors had caused many guests to request to move to other areas within the resort. This is the first field demonstration performed by Oak Ridge National Laboratory where significant energy savings, operating cost savings, and dramatically improved indoor environmental conditions can all be claimed as the results of a retrofit desiccant equipment field installation. The ADM/rooftop combination installed at the restaurant resulted in a reduction of about 34% in the electricity used by the building's air-conditioning system. This represents a reduction of approximately 15% in overall electrical energy consumption and a 12.5-kW reduction in peak demand. The cost of gas used for regeneration of the desiccant wheel over this period of time is estimated to be only $740, using a gas cost of $0.50 per therm--the summer rate in 2001. The estimated net savings is $5400 annually, resulting in a 1-2 year payback. It is likely that similar energy/cost savings were realized at the Callaway Gardens hotel. In this installation, however, a central plant supplied the chilled water serving fan coil units in the hotel wing retrofitted with the ADM, so it was not metered separately. Consequently, the owner could not provide actual energy consumption data specific to the facility. The energy and operating cost savings at both sites are directly attributable to higher cooling-season thermostat settings and decreased conventional system run times. These field installations were selected as an immediate and appropriate response to correct indoor humidity and fresh air ventilation problems being experienced by building occupants and owners, so no rigorous baseline-building vs. test-building energy use/operating cost savings results can be presented. The report presents several simulated comparisons between the ADM/roof HVAC approach and other equipment combinations, where both desiccant and conventional systems are modeled to provide comparable fresh air ventilation rates and indoor humidity levels. The results obtained from these simulations demonstrate convincingly the energy and operating cost savings obtainable with this hybrid desiccant/vapor-compression technology, verifying those actually seen at the pilot installations. The ADM approach is less expensive than conventional alternatives providing similar performance and indoor air quality and provides a very favorable payback (1 year or so) compared with oversized rooftop units that cannot be operated effectively with the necessary high outdoor air percentages.« less

  18. Physical installation of Pelletron and electron cooling system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurh, P.

    1997-09-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure areamore » and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here.« less

  19. Design data brochure: SIMS prototype system 3

    NASA Technical Reports Server (NTRS)

    1978-01-01

    A closed hydronic solar system is reported for space and hot water heating. Design, performance, and hardware specifications are presented sufficient for architectural engineers and contractors to procure, install, operate, and maintain a similar solar application.

  20. Design data brochure: SIMS prototype system 2

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Information is provided on the design and performance of the IBM SIMS Prototype System 2, solar domestic hot water system, for single family residences. The document provides sufficient data to permit procurement, installation, operation, and maintenance by qualified architectural engineers or contractors.

  1. The Architect's Guide to Mechanical Systems.

    ERIC Educational Resources Information Center

    Andrews, F. T.

    The principles and problems of designing new building mechanical systems are discussed in this reference source in the light of data on the functions and operation of mechanical systems. As a practical guide to understanding mechanical systems it describes system types, functions, space requirements, weights, installation, maintenance and…

  2. 14 CFR 23.1309 - Equipment, systems, and installations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... compliance with this section with regard to the electrical power system and to equipment design and... the system must be able to supply the following power loads in probable operating combinations and for probable durations: (1) Loads connected to the power distribution system with the system functioning...

  3. 30 CFR 250.431 - What are the diverter design and installation requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.431 What are the diverter design and... configurations and at least 12 inches for floating drilling operations; (b) Use dual diverter lines arranged to...

  4. 30 CFR 250.431 - What are the diverter design and installation requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.431 What are the diverter design and... configurations and at least 12 inches for floating drilling operations; (b) Use dual diverter lines arranged to...

  5. 30 CFR 250.431 - What are the diverter design and installation requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Diverter System Requirements § 250.431 What are the diverter design and... configurations and at least 12 inches for floating drilling operations; (b) Use dual diverter lines arranged to...

  6. 48 CFR 9905.506-60 - Illustrations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., installs a computer service center to begin operations on May 1. The operating expense related to the new... operating expenses of the computer service center for the 8-month part of the cost accounting period may be... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Illustrations. 9905.506-60...

  7. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  8. Installed Cost Benchmarks and Deployment Barriers for Residential Solar Photovoltaics with Energy Storage: Q1 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ardani, Kristen; O'Shaughnessy, Eric; Fu, Ran

    2016-12-01

    In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quartermore » of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.« less

  9. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... gas temperature monitors upstream and/or downstream of the catalyst bed as required in § 63.3967(b... (a) and (c)(3)(i) through (v) of this section for each gas temperature monitoring device. (i) Locate...

  10. 40 CFR 63.4568 - What are the requirements for continuous parameter monitoring system installation, operation, and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., install a gas temperature monitor in the firebox of the thermal oxidizer or in the duct immediately... gas temperature monitors upstream and/or downstream of the catalyst bed as required in § 63.3967(b... (a) and (c)(3)(i) through (v) of this section for each gas temperature monitoring device. (i) Locate...

  11. Calibration of the Total and Static Pressure Transducers in the DSTO Transonic Wind Tunnel

    DTIC Science & Technology

    2010-08-01

    handled by the ActiveX control MSCOMM32.OCX which is not part of the Microsoft Windows operating system. It is, however, included as part of the...implemented new measures to register ActiveX controls in its Windows suite of operating systems, which has made the above file obsolete and it could no...longer be used if the Windows operating system were updated. If this is the case, then the new version of ActiveX control files can be installed using

  12. Minimization of the energy storage requirements of a stand-alone wind power installation by means of photovoltaic panels

    NASA Astrophysics Data System (ADS)

    Kaldellis, J. K.; Kostas, P.; Filios, A.

    2006-07-01

    Autonomous wind power systems are among the most interesting and environmentally friendly technological solutions for the electrification of remote consumers. In many cases, however, the battery contribution to the initial or the total operational cost is found to be dominant, discouraging further penetration of the available wind resource. This is basically the case for areas possessing a medium-low wind potential. On the other hand, several isolated consumers are located in regions having the regular benefit of an abundant and reliable solar energy supply. In this context the present study investigates the possibility of reducing the battery size of a stand-alone wind power installation by incorporating a small photovoltaic generator. For this purpose an integrated energy production installation based exclusively on renewable energy resources is hereby proposed. Subsequently a new numerical algorithm is developed that is able to estimate the appropriate dimensions of a similar system. According to the results obtained by long-term experimental measurements, the introduction of the photovoltaic panels considerably improves the operational and financial behaviour of the complete installation owing to the imposed significant battery capacity diminution. Copyright

  13. Commissioning of the first chambers of the CMS GE1/1 muon station

    NASA Astrophysics Data System (ADS)

    Ressegotti, Martina; CMS Muon Group

    2017-12-01

    The upgrades of the LHC planned in the next years will increase the instantaneous luminosity up to 5 × 1034 cm -2 s -1 after Long Shutdown 3, a value about five times higher than the nominal one for which the CMS experiment was designed. The resulting larger rate of interactions will produce a higher pileup environment that will challenge the trigger system of the CMS experiment in its original configuration, in particular in the endcap region. As part of the upgrade program of the CMS muon endcaps, additional muon detectors based on Gas Electron Multiplier (GEM) technology will be installed, in order to be able to sustain a physics program during high-luminosity operation without performance losses. The installation of the GE1/1 station is scheduled for Long Shutdown 2 in 2019-2020 already a demonstrator composed of five superchambers has been installed during the Extended Year-End Technical Stop at the beginning of 2017. Its goal is to test the system’s operational conditions and also to demonstrate the integration of the GE1/1 chambers into the CMS online system. The status of the installation and commissioning of the GE1/1 demonstrator is presented.

  14. Integration& Operation of a Microgrid at Santa Rita Jail

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chevron Energy Solutions; Alameda County; DeForest, Nicholas

    2011-05-01

    Santa Rita Jail is a 4,500 inmate facility located in Dublin CA, approximately 40 miles (65 km) east of San Francisco. Over the past decade, a series of Distributed Energy Resources (DER) installations and efficiency measures have been undertaken to transform the 3MW facility into a"Green Jail". These include a 1.2MW rated rooftop PV system installed in 2002, a 1MW molten carbonate fuel cell with CHP, and retrofits to lighting and HVAC systems to reduce peak loads. With the upcoming installation of a large-scale battery and fast static disconnect switch, Santa Rita Jail will become a true microgrid, with fullmore » CERTS Microgrid functionality. Consequently, the jail will be able to seamlessly disconnect from the grid and operate as an island in the event of a disturbance, reconnecting again once the disturbance has dissipated. The extent to which that jail is capable of islanding is principally dependant on the energy capacity of the battery-one focus of this investigation. Also presented here are overviews of the DER currently installed at the jail, as well as the value it provides by offsetting the purchase of electricity under the current Pacific Gas& Electric (PG&E) tariff.« less

  15. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  16. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  17. 75 FR 36449 - Yankee Atomic Electric Co.; Yankee Atomic Independent Spent Fuel Storage Installation; Issuance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... Specification (TS) Surveillance Requirement 3.1.6.1 to verify the operability of the concrete cask heat removal....6.1 to verify the operability of the concrete cask heat removal system to maintain safe storage...

  18. Concept of Operations : SeaTA-Enhanced Travel Time Estimates and Traffic Management Practices for the St. Lawrence Seaway

    DOT National Transportation Integrated Search

    2017-10-16

    This Concept of Operations (ConOps) is the final installment in a series of three reports focused on identifying opportunities for the application of Intelligent Transportation System (ITS) technologyor equivalentwithin the maritime transportat...

  19. Vibration Mitigation for a Cryogen-Free Dilution Refrigerator for the AMoRE-Pilot Experiment

    NASA Astrophysics Data System (ADS)

    Lee, C.; Jo, H. S.; Kang, C. S.; Kim, G. B.; Kim, I.; Kim, Y. H.; Lee, H. J.; So, J. H.

    2018-06-01

    The Advanced Mo-based Rare process Experiment utilizes a cryogen-free dilution refrigerator to operate its low-temperature detectors. Mechanical vibration originating from its pulse tube refrigerator can affect the detector performance. A mechanical filter system has been installed between the 4K and still plates with eddy current dampers in addition to a spring-loaded damping system previously installed below the mixing chamber plate of the cryostat. The filters significantly mitigated vibrations and improved the detector signals.

  20. Install active/passive neutron examination and assay (APNEA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1996-04-01

    This document describes activities pertinent to the installation of the prototype Active/Passive Neutron Examination and Assay (APNEA) system built in Area 336 into its specially designed trailer. It also documents the basic theory of operation, design and protective features, basic personnel training, and the proposed characterization site location at Lockheed Martin Specialty Components, Inc., (Specialty Components) with the estimated 10 mrem/year boundary. Additionally, the document includes the Preventive Change Analysis (PCA) form, and a checklist of items for verification prior to unrestricted system use.

  1. Cost and Performance Report Low Impact Technologies to Reduce Pollution from Storm Water Runoff SI-200405

    DTIC Science & Technology

    2008-09-01

    will have to be removed and replaced with new media. Coarser material would also enable more sediment to be filtered through the bed depth as opposed...purpose of this demonstration was to obtain information on the effectiveness of a new storm water filter system that is not currently available in the...system at military installations involves new capital and operating costs. And like many industrial installations, neither NRRC nor ANAD had storm

  2. Development of termination and utilization concepts for flat conductor cables. Volume 3: Cost study comparison, flat versus round conductor cable

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A cost study comparing flat conductor cable (FCC) with small-gage wire (SGW) and conventional round conductor cable (RCC) is presented. This study was based on a vehicle wiring system consisting of 110,000 ft of conventional RCC equally divided between AWG sizes 20,22, and 24 using MIL-W-81044-type wire and MIL-C-26500 circular connectors. Basic cost data were developed on a similar-sized commercial jet airplane wiring system on a previous company R&D program in which advanced wiring techniques were carried through equivalent installations on an airplane mockup; and on data developed on typical average bundles during this program. Various cost elements included were engineering labor, operations (manufacturing) labor, material costs, and cost impact on payload. Engineering labor includes design, wiring system integration, wiring diagrams and cable assembly drawings, wire installations, and other related supporting functions such as the electronic data processing for the wiring. Operations labor includes mockup, tooling and production planning, fabrication, assembly, installation, and quality control cost impact on payload is the conversion of wiring system weight variations through use of different wiring concepts to program payload benefits in terms of dollars.

  3. 75 FR 70703 - Humana Insurance Company a Division of Carenetwork, Inc. Front End Operations and Account...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Division of CareNetwork, Inc., Front End Operations and Account Installation-Product Testing Groups, De... a Division of Carenetwork, Inc. Front End Operations and Account Installation-Product Testing Groups..., a Division of CareNetwork, Inc., Front End Operations and Account Installation- Product Testing...

  4. Electricity Submetering on the Cheap: Stick-on Electricity Meters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lanzisera, Steven; Lorek, Michael; Pister, Kristofer

    2014-08-17

    We demonstrate a low-cost, 21 x 12 mm prototype Stick-on Electricity Meter (SEM) to replace traditional in-circuit-breaker-panel current and voltage sensors for building submetering. A SEM sensor is installed on the external face of a circuit breaker to generate voltage and current signals. This allows for the computation of real and apparent power as well as capturing harmonics created by non-linear loads. The prototype sensor is built using commercially available components, resulting in a production cost of under $10 per SEM. With no highvoltage install work requiring an electrician, home owners or other individuals can install the system in amore » few minutes with no safety implications. This leads to an installed system cost that is much lower than traditional submetering technology.. Measurement results from lab characterization as well as a real-world residential dwelling installation are presented, verifying the operation of our proposed SEM sensor. The SEM sensor can resolve breaker power levels below 10W, and it can be used to provide data for non-intrusive load monitoring systems at full sample rate.« less

  5. CERN experience and strategy for the maintenance of cryogenic plants and distribution systems

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Pezzetti, M.; Pirotte, O.; Tavian, L.; Wagner, U.

    2015-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. After several years of exploitation of a wide range of cryogenic installations and in particular following the last two years major shutdown to maintain and consolidate the LHC machine, we have analysed and reviewed the maintenance activities to implement an efficient and reliable exploitation of the installations. We report the results, statistics and lessons learned on the maintenance activities performed and in particular the required consolidations and major overhauling, the organization, management and methodologies implemented.

  6. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the south side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  7. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  8. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    A heavy-lift crane lifts the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the south wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  9. Platform C Installation

    NASA Image and Video Library

    2016-10-19

    Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a construction worker assist with the installation of the first half of the C-level work platforms, C south, for NASA’s Space Launch System (SLS) rocket. The large bolts that hold the platform in place on the south wall are being secured. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  10. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be installed on the north side of High Bay 3. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  11. Platform C North Installation

    NASA Image and Video Library

    2016-11-10

    A heavy-lift crane lifts the second half of the C-level work platforms, C north, for NASA’s Space Launch System (SLS) rocket, high up from the transfer aisle floor of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida. The C platform will be moved into High Bay 3 for installation on the north wall. The C platforms are the eighth of 10 levels of work platforms that will surround and provide access to the SLS rocket and Orion spacecraft for Exploration Mission 1. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3, including installation of the new work platforms, to prepare for NASA’s Journey to Mars.

  12. Construction quality assurance report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roscha, V.

    1994-09-08

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Constructionmore » Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.« less

  13. Integrally geared and integrated turbine generator energy recovery for high pressure natural gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agahi, R.R.; Ershaghi, B.; Moser, H.

    1995-12-31

    Recovery of pressure let-down energy dates back to the early 1980`s. Several installations have proven the feasibility and attractive pay back of using turbine generator system in lieu of throttling valves. These installations, on average, are saving up to 200,000 barrels of fuel oil per year. Since the first installation, many improvements have been implemented in turboexpander packages and the associated control systems. Based on site requirements, two alternate designs may be introduced. One is a totally encapsulated integral turboexpander generator unit. The other is an integrally geared turboexpander. Both alternatives have the flexibility necessary to cope with a widemore » range of inlet gas conditions while maintaining required outlet gas conditions. These installations are environmentally friendly (no hazardous gas leakage) and operate within an acceptable noise level.« less

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stein, Joshua; Burnham, Laurie; Jones, Christian Birk

    The U.S. DOE Regional Test Center for Solar Technologies program was established to validate photovoltaic (PV) technologies installed in a range of different climates. The program is funded by the Energy Department's SunShot Initiative. The initiative seeks to make solar energy cost competitive with other forms of electricity by the end of the decade. Sandia National Laboratory currently manages four different sites across the country. The National Renewable Energy Laboratory manages a fifth site in Colorado. The entire PV portfolio currently includes 20 industry partners and almost 500 kW of installed systems. The program follows a defined process that outlinesmore » tasks, milestones, agreements, and deliverables. The process is broken out into four main parts: 1) planning and design, 2) installation, 3) operations, and 4) decommissioning. This operations manual defines the various elements of each part.« less

  15. Costs to Automate Demand Response - Taxonomy and Results from Field Studies and Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piette, Mary A.; Schetrit, Oren; Kiliccote, Sila

    During the past decade, the technology to automate demand response (DR) in buildings and industrial facilities has advanced significantly. Automation allows rapid, repeatable, reliable operation. This study focuses on costs for DR automation in commercial buildings with some discussion on residential buildings and industrial facilities. DR automation technology relies on numerous components, including communication systems, hardware and software gateways, standards-based messaging protocols, controls and integration platforms, and measurement and telemetry systems. This report compares cost data from several DR automation programs and pilot projects, evaluates trends in the cost per unit of DR and kilowatts (kW) available from automated systems,more » and applies a standard naming convention and classification or taxonomy for system elements. Median costs for the 56 installed automated DR systems studied here are about $200/kW. The deviation around this median is large with costs in some cases being an order of magnitude great or less than the median. This wide range is a result of variations in system age, size of load reduction, sophistication, and type of equipment included in cost analysis. The costs to automate fast DR systems for ancillary services are not fully analyzed in this report because additional research is needed to determine the total cost to install, operate, and maintain these systems. However, recent research suggests that they could be developed at costs similar to those of existing hot-summer DR automation systems. This report considers installation and configuration costs and does include the costs of owning and operating DR automation systems. Future analysis of the latter costs should include the costs to the building or facility manager costs as well as utility or third party program manager cost.« less

  16. Design and operation of a 1000 C lithium-cesium test system

    NASA Technical Reports Server (NTRS)

    Hays, L. G.; Haskins, G. M.; Oconnor, D. E.; Torola, J., Jr.

    1973-01-01

    A 100 kWt cesium-lithium test loop fabricated of niobium-1% zirconium for experiments on erosion and two-phase system operation at temperatures of 980 C and velocities of 150 m/s. Although operated at design temperature for 100 hours, flow instabilities in the two-phase separator interfered with the achievement of the desired mass flow rates. A modified separator was fabricated and installed in the loop to alleviate this problem.

  17. A cognitive operating system (COGNOSYS) for JPL's robot, phase 1 report

    NASA Technical Reports Server (NTRS)

    Mathur, F. P.

    1972-01-01

    The most important software requirement for any robot development is the COGNitive Operating SYStem (COGNOSYS). This report describes the Stanford University Artificial Intelligence Laboratory's hand eye software system from the point of view of developing a cognitive operating system for JPL's robot. In this, the Phase 1 of the JPL robot COGNOSYS task the installation of a SAIL compiler and a FAIL assembler on Caltech's PDP-10 have been accomplished and guidelines have been prepared for the implementation of a Stanford University type hand eye software system on JPL-Caltech's computing facility. The alternatives offered by using RAND-USC's PDP-10 Tenex operating sytem are also considered.

  18. Stennis all-hazards network adopted throughout NASA

    NASA Image and Video Library

    2009-10-13

    Stennis Space Center employees Mike McKinion (left), with Erica Lane Enterprises, and Luke Scianna, with the Jacobs Facility Operating Services Contract, monitor the facility and surrounding area on the 'all-hazards network' known as HazNet. The HazNet system at Stennis was developed by a local Mississippi company to help facilitate coordinated response during emergency and disaster situations. The system was installed in the new Emergency Operations Center built at Stennis before being implemented throughout NASA. HazNet was designed by NVision Solutions Inc. of Bay St. Louis, Miss., through NASA's Innovative Partnerships Program. In addition to being used at Stennis, it has been installed at other Gulf Coast communities to help coordinate response during emergencies and such natural disasters as hurricanes.

  19. 30 CFR 250.1629 - Additional production and fuel gas system requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operating range. (2) Engine exhaust. You must equip engine exhausts to comply with the insulation and... structure. (4) Fire- and gas-detection system. (i) Fire (flame, heat, or smoke) sensors shall be installed...

  20. SNS Central Helium Liquefier spare Carbon Bed installation and commissioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Degraff, Brian D.; Howell, Matthew P.; Kim, Sang-Ho

    The Spallation Neutron Source (SNS) Central Helium Liquefier (CHL) at Oak Ridge National Laboratory (ORNL) has been without major operations downtime since operations were started back in 2006. This system utilizes a vessel filled with activated carbon as the final major component to remove oil vapor from the compressed helium circuit prior to insertion into the system's cryogenic cold box. The need for a spare carbon bed at SNS due to the variability of carbon media lifetime calculation to adsorption efficiency will be discussed. The fabrication, installation and commissioning of this spare carbon vessel will be presented. The novel planmore » for connecting the spare carbon vessel piping to the existing infrastructure will be presented.« less

Top