Sample records for integrated plan presented

  1. Research Planning Process

    NASA Technical Reports Server (NTRS)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  2. Space shuttle operations integration plan

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Operations Integration Plan is presented, which is to provide functional definition of the activities necessary to develop and integrate shuttle operating plans and facilities to support flight, flight control, and operations. It identifies the major tasks, the organizations responsible, their interrelationships, the sequence of activities and interfaces, and the resultant products related to operations integration.

  3. Lunar-Ultraviolet Telescope Experiment (LUTE) integrated program plan

    NASA Technical Reports Server (NTRS)

    Smith, Janice F. (Compiler); Forrest, Larry

    1993-01-01

    A detailed Lunar Ultraviolet Telescope Experiment (LUTE) program plan representing major decisions and tasks leading to those decisions for program execution are presented. The purpose of this task was to develop an integrated plan of project activities for the LUTE project, and to display the plan as an integrated network that shows the project activities, all critical interfaces, and schedules. The integrated network will provide the project manager with a frame work for strategic planning and risk management throughout the life of the project.

  4. IDC Integrated Master Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  5. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    ERIC Educational Resources Information Center

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  6. Systematic Technology Planning: GSFC Perspective

    NASA Technical Reports Server (NTRS)

    Steiner, Mark

    2004-01-01

    This viewgraph presentation describes the experiences of Goddard Space Flight Center (GSFC) in integrating systematic technology investment planning into the process of architecting NASA space missions. The presentation uses the assessment of a lidar mission as a case study, and illustrates integration strategies through flow charts and dynamic systems models.

  7. NOx SOx Secondary NAAQS: Integrated Review Plan - CASAC Advisory

    EPA Science Inventory

    The NOx SOx Secondary NAAQS Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review,...

  8. Snakes: An Integrated Unit Plan.

    ERIC Educational Resources Information Center

    Lawrence, Lisa

    This document presents an integrated unit plan on snakes targeting second grade students. Objectives of the unit include developing concepts of living things, understanding the contribution and importance of snakes to the environment, and making connections between different disciplines. The unit integrates the topic of snakes into the areas of…

  9. Sulfur Dioxide (SO2) Primary NAAQS Review: Integrated Review Plan - Advisory with CASAC

    EPA Science Inventory

    The SO2 Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-...

  10. Is health systems integration being advanced through Local Health District planning?

    PubMed

    Saunders, Carla; Carter, David J

    2017-05-01

    Objective Delivering genuine integrated health care is one of three strategic directions in the New South Wales (NSW) Government State Health Plan: Towards 2021. This study investigated the current key health service plan of each NSW Local Health District (LHD) to evaluate the extent and nature of health systems integration strategies that are currently planned. Methods A scoping review was conducted to identify common key principles and practices for successful health systems integration to enable the development of an appraisal tool to content assess LHD strategic health service plans. Results The strategies that are planned for health systems integration across LHDs focus most often on improvements in coordination, health care access and care delivery for complex at-risk patients across the care continuum by both state- and commonwealth-funded systems, providers and agencies. The most common reasons given for integrated activities were to reduce avoidable hospitalisation, avoid inappropriate emergency department attendance and improve patient care. Conclusions Despite the importance of health systems integration and finding that all NSW LHDs have made some commitment towards integration in their current strategic health plans, this analysis suggests that health systems integration is in relatively early development across NSW. What is known about the topic? Effective approaches to managing complex chronic diseases have been found to involve health systems integration, which necessitates sound communication and connection between healthcare providers across community and hospital settings. Planning based on current health systems integration knowledge to ensure the efficient use of scarce resources is a responsibility of all health systems. What does this paper add? Appropriate planning and implementation of health systems integration is becoming an increasingly important expectation and requirement of effective health systems. The present study is the first of its kind to assess the planned activity in health systems integration in the NSW public health system. NSW health districts play a central role in health systems integration; each health service plan outlines the strategic directions for the development and delivery of all state-funded services across each district for the coming years, equating to hundreds of millions of dollars in health sector funding. The inclusion of effective health systems integration strategies allows Local Health Districts to lay the foundation for quality patient outcomes and long-term financial sustainability despite projected increases in demand for health services. What are the implications for practice? Establishing robust ongoing mechanisms for effective health systems integration is now a necessary part of health planning. The present study identifies several key areas and strategies that are wide in scope and indicative of efforts towards health systems integration, which may support Local Health Districts and other organisations in systematic planning and implementation.

  11. Nitrogen Oxides (NOx) Primary NAAQS REVIEW: Integrated ...

    EPA Pesticide Factsheets

    The NOx Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the NOx Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the NO2 primary NAAQS. A draft of the integrated review plan will be the subject of an advisory review with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.

  12. Sulfur Dioxide (SO2) Primary NAAQS Review: Integrated ...

    EPA Pesticide Factsheets

    The SO2 Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the SO2 Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the SO2 primary NAAQS. A draft of the integrated review plan will be the subject of an advisory with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.

  13. NOx SOx Secondary NAAQS: Integrated Review Plan ...

    EPA Pesticide Factsheets

    The NOx SOx Secondary NAAQS Integrated Review Plan is the first document generated as part of the National Ambient Air Quality Standards (NAAQS) review process. The Plan presents background information, the schedule for the review, the process to be used in conducting the review, and the key policy-relevant science issues that will guide the review. The integrated review plan also discusses the frameworks for the various assessment documents to be prepared by the EPA as part of the review, including an Integrated Science Assessment (ISA), and as warranted, a Risk/Exposure Assessment (REA), and a Policy Assessment (PA). The primary purpose of the NOx SOx Secondary NAAQS Integrated Review Plan is to highlight the key policy-relevant issues to be considered in the Review of the Oxides of Nitrogen and Oxides of Sulfur Secondary NAAQS. A draft of the integrated review plan will be the subject of an advisory review with the Clean Air Scientific Advisory Committee (CASAC) and made available to the public for review and comment.

  14. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 1: Plenary Session

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Briefings from the plenary session of the conference on SSTAC/ARTS Review of the Draft Integrated Technology Plan (ITP) held on 24-28 Jun. 1991 are included. Viewgraphs from the presentations are included.

  15. Integrative Life Planning: A Holistic Approach

    ERIC Educational Resources Information Center

    Hansen, Sunny Sundal

    2011-01-01

    This article presents a brief description of integrative life planning (ILP), the career theory/concept created in the 1990s by the author. It describes what she calls "the heart of ILP," the 6 critical life tasks and their applications.

  16. Changes in contraceptive use following integration of family planning into ART Services in Cross River State, Nigeria.

    PubMed

    McCarraher, Donna R; Vance, Gwyneth; Gwarzo, Usman; Taylor, Douglas; Chabikuli, Otto Nzapfurundi

    2011-12-01

    One strategy for meeting the contraceptive needs of HIV-positive women is to integrate family planning into HIV services. In 2008 in Cross River State, Nigeria,family planning was integrated into antiretroviral (ART) services in five local government areas. A basic family planning/HIV integration model was implemented in three of these areas, and an enhanced model in the other two. We conducted baseline interviews in 2008 and follow-up interviews 12-14 months later with 274 female ART clients aged 18-45 in 2009 across the five areas. Unmet need for contraception was high at baseline (28-35 percent). We found that modern contraceptive use rose in the enhanced and basic groups; most of the increase was in consistent condom use. Despite an increase in family planning counseling by ART providers, referrals to family planning services for noncondom methods were low. We conclude by presenting alternative strategies for family planning/HIV integration in settings where large families and low contraceptive use are normative.

  17. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  18. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  19. Integrated vehicle-based safety systems (IVBSS) : light vehicle platform field operational test data analysis plan.

    DOT National Transportation Integrated Search

    2009-12-22

    This document presents the University of Michigan Transportation Research Institutes plan to : perform analysis of data collected from the light vehicle platform field operational test of the : Integrated Vehicle-Based Safety Systems (IVBSS) progr...

  20. Integrated vehicle-based safety systems (IVBSS) : heavy truck platform field operational test data analysis plan.

    DOT National Transportation Integrated Search

    2009-11-23

    This document presents the University of Michigan Transportation Research Institutes plan to perform : analysis of data collected from the heavy truck platform field operational test of the Integrated Vehicle- : Based Safety Systems (IVBSS) progra...

  1. System integration test plan for HANDI 2000 business management system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, D.

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  2. Integrated corridor management initiative : demonstration phase evaluation – Dallas corridor performance analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  3. Integrated corridor management initiative : demonstration phase evaluation – San Diego corridor performance analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Corridor Performance Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  4. Integrated corridor management initiative : demonstration phase evaluation - Dallas decision support system analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Decision Support System (DSS) Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration....

  5. Integrated corridor management initiative : demonstration phase evaluation – Dallas technical capability analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM ...

  6. The entropy reduction engine: Integrating planning, scheduling, and control

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Bresina, John L.; Kedar, Smadar T.

    1991-01-01

    The Entropy Reduction Engine, an architecture for the integration of planning, scheduling, and control, is described. The architecture is motivated, presented, and analyzed in terms of its different components; namely, problem reduction, temporal projection, and situated control rule execution. Experience with this architecture has motivated the recent integration of learning. The learning methods are described along with their impact on architecture performance.

  7. Integrated corridor management initiative : demonstration phase evaluation – San Diego benefit-cost analysis test plan.

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM project...

  8. Integrating Science with Technical and Vocational Areas.

    ERIC Educational Resources Information Center

    Snyder, Larry; Shreckengast, Craig

    This guide presents learning activities and lesson plans that integrate science with technical and vocational areas. Activities and plans are organized under broad headings such as Environmental Science and Acid Rain Research; Criminal Justice, Chemistry, and Narcotics; Children's Education and Services; Cosmetology; and Health Professions.…

  9. IPEM: An Integrated Planning, Effectiveness Model.

    ERIC Educational Resources Information Center

    Donsky, Aaron P.

    While historically higher education has utilized many different planning paradigms and elements, two concepts (strategic planning and operational planning) can be presented as the major planning concepts into which the various paradigms can be placed. Starting in fall 1991, Seminole Community College developed a planning model which integrated…

  10. Strategic and Operational Plan for Integrating Transcriptomics ...

    EPA Pesticide Factsheets

    Plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT; the details are in the attached slide presentation presentation on plans for incorporating high throughput transcriptomics into the current high throughput screening activities at NCCT, given at the OECD meeting on June 23, 2016

  11. USDOT Integrated Corridor Management (ICM) Initiative Transit Data Gaps for Rail Transit Systems Initial Planning Workshop Notes

    DOT National Transportation Integrated Search

    2008-06-23

    This document presents the notes taken at the USDOT Integrated Corridor Management (ICM) Transit Data Gaps for Rail Transit Systems Initial Planning Workshop. Different scenarios for handling increased demand on rail and bus transit systems are discu...

  12. Data management and processing plan, Department of Applied Geodesy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.

  13. A negotiation methodology and its application to cogeneration planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, S.M.; Liu, C.C.; Luu, S.

    Power system planning has become a complex process in utilities today. This paper presents a methodology for integrated planning with multiple objectives. The methodology uses a graphical representation (Goal-Decision Network) to capture the planning knowledge. The planning process is viewed as a negotiation process that applies three negotiation operators to search for beneficial decisions in a GDN. Also, the negotiation framework is applied to the problem of planning for cogeneration interconnection. The simulation results are presented to illustrate the cogeneration planning process.

  14. Lesson Plans for Teaching Young Adult Literature.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    Intended for teachers, this book is a collection of lesson plans created by 28 teachers in North Carolina to provide opportunities that support integrated learning. Using recommended young adult literature, the book presents activities which promote the integration of listening, speaking, reading, writing, and viewing. The book provides two or…

  15. An Integrated Spreadsheet Approach to Production Planning and Control in the Introductory POM Course.

    ERIC Educational Resources Information Center

    Newman, William

    1989-01-01

    Discusses an integrated approach for presenting production planning and control fundamentals at the survey level using a Lotus 1-2-3 template. This approach provides an overview of the relationships between the problem components and highlights managerial decision-making points. (Author/JOW)

  16. Strategic Enterprise Resource Planning for Global Supply Chain Competitiveness

    ERIC Educational Resources Information Center

    Nageswararao, A. V.; Sahu, Dasarathi; Mohan, V. Krishna

    2011-01-01

    Strategic Enterprise Resource planning (SERP) systems are networked and integrated information mechanisms which are developed to achieve competitive advantage for organizations operating in global scale. It plays a vital role in Integrating various stake holders and channel partners involved in day to day operations. In the present Globalized…

  17. Planning the Implementation of an Integrated On-line Acquisitions System.

    ERIC Educational Resources Information Center

    Baldwin, Paul E.

    1984-01-01

    Discusses need to consider political context of decision-making process and describes how cost data were presented to obtain management approval for implementation planning for integrated online acquisitions and fund accounting system involving Simon Fraser University, University of British Columbia, and University of Victoria. Cost, budget, and…

  18. Integrating environment into land-use planning through strategic environmental assessment in China: Towards legal frameworks and operational procedures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tao Tang; Tan Zhu; He Xu

    China currently put forwards 'striving to build an environmentally friendly society' as one of the most important development goals. The land administration authorities are facing the challenge of effectively incorporating environment considerations into their planning system. This paper aims to investigate why and how Strategic Environmental Assessment (SEA) is enacted as an effective tool to integrate the environment into land-use planning during the construction process of an environmentally friendly society in China, and identify factors that influence the integration. It presents characteristics of the land-use planning system, and reviews the progress and current state of SEA in China. Results showmore » that SEA provides many benefits in promoting environmental considerations into the land-use planning process. The legal frameworks and operational procedures, in the context of land-use master planning SEA, are summarized and an assessment made of their effectiveness. Some barriers are highlighted through examination of the latest case studies, and several recommendations are presented to overcome these obstacles.« less

  19. ENVIRONMENTAL PLANNING FOR SMALL COMMUNITIES: A GUIDE FOR LOCAL DECISION-MAKERS

    EPA Science Inventory

    Environmental Planning for Small Communities - A Guide for Local Decision-Makers presents a process for creating and implementing a community environmental plan. With a comprehensive environmental plan, local decision-makers can create an integrated approach to protecting the env...

  20. World Cup 2010 planning: an integration of public health and medical systems.

    PubMed

    Yancey, Arthur H; Fuhri, Peter D; Pillay, Yogan; Greenwald, Ian

    2008-10-01

    To present crucial stages of planning and the resources involved in the medical and health care that will address issues affecting the health and safety of all participants in the 2010 World Cup. Relevant literature reviews of mass gathering medical care supplemented experience of the authors in planning for previous similar events. Attention is focused on issues wherein effective planning requires the integration of public health practices with those of clinical emergency medical services. The tables that are included serve to illustrate the depth and breadth of planning as well as the organizational relationships required to execute care of a universally acceptable standard. This article offers guidance in planning for the 2010 World Cup health and emergency medical care, emphasizing the need for integration of public health and medical practices. It depicts the span of planning envisioned, the organizational relationships crucial to it, and emphasizes the necessity of an early start.

  1. Integrated Design System (IDS) Tools for the Spacecraft Aeroassist/Entry Vehicle Design Process

    NASA Technical Reports Server (NTRS)

    Olynick, David; Braun, Robert; Langhoff, Steven R. (Technical Monitor)

    1997-01-01

    The definition of the Integrated Design System technology focus area as presented in the NASA Information Technology center of excellence strategic plan is described. The need for IDS tools in the aeroassist/entry vehicle design process is illustrated. Initial and future plans for spacecraft IDS tool development are discussed.

  2. Advanced space program studies. Overall executive summary

    NASA Technical Reports Server (NTRS)

    Wolfe, M. G.

    1977-01-01

    NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.

  3. Strategic Long Range Planning for Universities. AIR Forum 1980 Paper.

    ERIC Educational Resources Information Center

    Baker, Michael E.

    The use of strategic long-range planning at Carnegie-Mellon University (CMU) is discussed. A structure for strategic planning analysis that integrates existing techniques is presented, and examples of planning activities at CMU are included. The key concept in strategic planning is competitive advantage: if a university has a competitive…

  4. Spacelab operations planning. [ground handling, launch, flight and experiments

    NASA Technical Reports Server (NTRS)

    Lee, T. J.

    1976-01-01

    The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.

  5. Advancing metropolitan planning for operations : an objectives-driven, performance-based approach : a guidebook

    DOT National Transportation Integrated Search

    2010-02-01

    This guidebook presents an approach for integrating management and operations (M&O) strategies into the metropolitan transportation planning process that is designed to maximize the performance of the existing and planned transportation system. This ...

  6. The capability and constraint model of recoverability: An integrated theory of continuity planning.

    PubMed

    Lindstedt, David

    2017-01-01

    While there are best practices, good practices, regulations and standards for continuity planning, there is no single model to collate and sort their various recommended activities. To address this deficit, this paper presents the capability and constraint model of recoverability - a new model to provide an integrated foundation for business continuity planning. The model is non-linear in both construct and practice, thus allowing practitioners to remain adaptive in its application. The paper presents each facet of the model, outlines the model's use in both theory and practice, suggests a subsequent approach that arises from the model, and discusses some possible ramifications to the industry.

  7. Integrating planning and reaction: A preliminary report

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Drummond, Mark

    1990-01-01

    The Entropy Reduction Engine architecture for integrating planning, scheduling, and control is examined. The architecture is motivated through a NASA mission scenario and a brief list of design goals. An overview is presented of the Entropy Reduction Engine architecture by describing its major components, their interactions, and the way in which these interacting components satisfy the design goals.

  8. Development of a Conference Planning Model Using Integrated Database, Word Processing, and Spreadsheet Software.

    ERIC Educational Resources Information Center

    Stevens, William E.

    This report presents a model for conducting a statewide conference for the approximately 900 members of the South Carolina Council of Teachers of Mathematics (SCCTM) using the AppleWorks integrated software as the basis of the implementation plan. The first and second chapters provide background information on the conference and the…

  9. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  10. Building the IOOS data management subsystem

    USGS Publications Warehouse

    de La Beaujardière, J.; Mendelssohn, R.; Ortiz, C.; Signell, R.

    2010-01-01

    We discuss progress to date and plans for the Integrated Ocean Observing System (IOOS??) Data Management and Communications (DMAC) subsystem. We begin by presenting a conceptual architecture of IOOS DMAC. We describe work done as part of a 3-year pilot project known as the Data Integration Framework and the subsequent assessment of lessons learned. We present work that has been accomplished as part of the initial version of the IOOS Data Catalog. Finally, we discuss near-term plans for augmenting IOOS DMAC capabilities.

  11. Computer-aided resource planning and scheduling for radiological services

    NASA Astrophysics Data System (ADS)

    Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.

    1996-05-01

    There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.

  12. Planning as an Iterative Process

    NASA Technical Reports Server (NTRS)

    Smith, David E.

    2012-01-01

    Activity planning for missions such as the Mars Exploration Rover mission presents many technical challenges, including oversubscription, consideration of time, concurrency, resources, preferences, and uncertainty. These challenges have all been addressed by the research community to varying degrees, but significant technical hurdles still remain. In addition, the integration of these capabilities into a single planning engine remains largely unaddressed. However, I argue that there is a deeper set of issues that needs to be considered namely the integration of planning into an iterative process that begins before the goals, objectives, and preferences are fully defined. This introduces a number of technical challenges for planning, including the ability to more naturally specify and utilize constraints on the planning process, the ability to generate multiple qualitatively different plans, and the ability to provide deep explanation of plans.

  13. An invisible benefit: integrated project on family planning and parasite control has expanded operations multi-dimensionally.

    PubMed

    Taniguchi, H

    1985-11-01

    Resolutions adopted by the 12th Annual Asian Parasite Control/Family Planning (APCO/FP) Conference held in Colombo, Sri Lanka urge the incorporation of quality of life issues of all dimensions in projects of all participating countries. 1 study discussed during the conference concerned health volunteers of the integrated project in Sri Lanka, which analyzes motivating factors which make community young people work on a voluntary basis. Another topic covered was the role of women in the achievement of primary health care. Video reports were presented by Bangladesh on family planning and parasite control activities, Brazil on utilization of existing organizations to improve successful integrated projects, China on making twin concerns of family planning and primary health care, Indonesia on strengthening urban FP/MCH clinics, Korea on health promotion through the integrated project, Malaysia on the NADI program, the Philippines on the Cebu model of integrated health care, and Thailand on fee charging urban programs.

  14. Rethinking Funding Strategies: Integrated Planning and Resource Development for the Small Two-Year College of 1990.

    ERIC Educational Resources Information Center

    Bender, Louis; Daniel, David

    1986-01-01

    Presents management models showing the evolution of public expectancy as reflected in legislated policy: the petty cash model, the public utility model, and the business model. Discusses the John A. Walker Community Center at Wilkes Community College (North Carolina) as an example of the integrated planning/resource development (i.e., business)…

  15. Integrating Mobile Phones into Teaching and Learning: A Case Study of Teacher Training through Professional Development Workshops

    ERIC Educational Resources Information Center

    Ekanayake, Sakunthala Y.; Wishart, Jocelyn

    2015-01-01

    This paper presents the development and implementation of a professional development workshop series on integrating mobile phones into science teaching for a group of teachers in Sri Lanka. The series comprised a 3-day Planning Workshop followed by implementation of the planned lessons in real classrooms and a subsequent 1-day Reviewing Workshop.…

  16. Opportunities and challenges of integrating ecological restoration into assessment and management of contaminated ecosystems.

    PubMed

    Hull, Ruth N; Luoma, Samuel N; Bayne, Bruce A; Iliff, John; Larkin, Daniel J; Paschke, Mark W; Victor, Sasha L; Ward, Sara E

    2016-04-01

    Ecosystem restoration planning near the beginning of the site assessment and management process ("early integration") involves consideration of restoration goals from the outset in developing solutions for contaminated ecosystems. There are limitations to integration that stem from institutional barriers, few successful precedents, and limited availability of guidance. Challenges occur in integrating expertise from various disciplines and multiple, sometimes divergent interests and goals. The more complex process can result in timing, capacity, communication, and collaboration challenges. On the other hand, integrating the 2 approaches presents new and creative opportunities. For example, integration allows early planning for expanding ecosystem services on or near contaminated lands or waters that might otherwise have been unaddressed by remediation alone. Integrated plans can explicitly pursue ecosystem services that have market value, which can add to funds for long-term monitoring and management. Early integration presents opportunities for improved and productive collaboration and coordination between ecosystem restoration and contaminant assessment and management. Examples exist where early integration facilitates liability resolution and generates positive public relations. Restoration planning and implementation before the completion of the contaminated site assessment, remediation, or management process ("early restoration") can facilitate coordination with offsite restoration options and a regional approach to restoration of contaminated environments. Integration of performance monitoring, for both remedial and restoration actions, can save resources and expand the interpretive power of results. Early integration may aid experimentation, which may be more feasible on contaminated lands than in many other situations. The potential application of concepts and tools from adaptive management is discussed as a way of avoiding pitfalls and achieving benefits in early integration. In any case, there will be challenges with early integration of restoration concepts for contaminated ecosystems, but the benefits are likely to outweigh them. © 2015 The Authors. Integrated Environmental Assessment and Management published by Wiley Periodicals, Inc. on behalf of Society of Environmental Toxicology & Chemistry (SETAC).

  17. Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's

    NASA Technical Reports Server (NTRS)

    Zobrist, George W.

    1994-01-01

    This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.

  18. A Planning Process and the Integration of Institutional Research.

    ERIC Educational Resources Information Center

    Spencer, R.; And Others

    Consisting mainly of charts, graphs, and lists, this publication presents materials used in the Delaware County Community College (DCCC) planning and institutional research processes. Guidelines for establishing DCCC mission, goals, objectives, and management by objectives performance standards relative to planning changes, instructional programs,…

  19. APPLICATION OF SUSTAINABILITY CRITERIA TO STELLA, MISSOURI-INTEGRATED PLANNING-PRELIMINARY SITE INFORMATION AND ELEMENTS OF THE MASTER PLAN

    EPA Science Inventory

    Sustainability in the context of a place is a set of responses to social, economic, and environmental criteria. Individually, these sets of criteria were addressed in prior presentations. This presentation illustrates the application of these three sets of criteria combined with ...

  20. Examples of the Integration of Technology in the Classroom.

    ERIC Educational Resources Information Center

    Kealey, Robert J., Ed.

    This book presents the following case studies of how some Catholic schools have integrated technology: (1) "A Plan for the Integration of Technology" (Teresa Anthony); (2) "Integrating Technology in the Classroom" (Charlotte Bennett); (3) "From Commodore 64 to the Millennium Technology" (Ann Heidkamp); (4) "A Technology Project for the Eighth…

  1. Integrating multiple publics into the strategic plan. The best plans can be derailed without comprehensive up-front research.

    PubMed

    Peltier, J W; Kleimenhagen, A K; Naidu, G M

    1996-01-01

    The mission of a health care organization represents its vision for the future. The authors present an approach used to develop an organizational mission for a large multispecialty physician clinic. In implementing the strategic planning process, research objectives must be clearly stated that identify in advance how the data will be used. Failure to integrate strategic data from all relevant publics will likely result in a mission statement that misses the significant interests of one or more stakeholders and reduces the effectiveness of the strategic planning process. Although costly, comprehensive research can uncover some surprising differences in perception that, if ignored, might complete defeat strategic planning efforts.

  2. Migrating data from TcSE to DOORS : an evaluation of the T-Plan Integrator software application.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Post, Debra S.; Manzanares, David A.; Taylor, Jeffrey L.

    2011-02-01

    This report describes our evaluation of the T-Plan Integrator software application as it was used to transfer a real data set from the Teamcenter for Systems Engineering (TcSE) software application to the DOORS software application. The T-Plan Integrator was evaluated to determine if it would meet the needs of Sandia National Laboratories to migrate our existing data sets from TcSE to DOORS. This report presents the struggles of migrating data and focuses on how the Integrator can be used to map a data set and its data architecture from TcSE to DOORS. Finally, this report describes how the bulk ofmore » the migration can take place using the Integrator; however, about 20-30% of the data would need to be transferred from TcSE to DOORS manually. This report does not evaluate the transfer of data from DOORS to TcSE.« less

  3. Affordable passive solar homes - low-cost, compact designs. [Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crowther, R.L.

    1984-01-01

    The designs and plans of this book present total, integrative, energy design. They carefully integrate site, architecture, and interior for various population segments that meet a frugal budget. The book is divided into two sections. The first part gives data concerning design, construction, site, climatic factors, materials, interiors, financing, and other home ownership factors that enhance affordability. Basic information on the design assumptions and considerations incorporate into the homes is presented, along with passive solar systems descriptions. The second part presents designs and plans with a brief review of considerations that serve defined human living needs, as well single-family, attached,more » or multiple residential configurations. The plans are based on a dimensional grid using 4-foot and 2-foot (1.2 meter and .61 meter) increments compatible with economic standard lumber and materials sizes.« less

  4. International Academy of Astronautics 5th cosmic study—preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary)

    NASA Astrophysics Data System (ADS)

    Koelle, H. H.; Stephenson, D. G.

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector.

  5. Statewide transportation planning for healthy communities

    DOT National Transportation Integrated Search

    2014-04-01

    This white paper presents insights and a flexible model for State Departments of Transportation (DOTs) that choose to integrate public health considerations into their transportation planning and decision-making. It draws from five case studies of in...

  6. Healthy Eating and Activity Across the Lifespan (HEAL): A call to action to integrate research, clinical practice, policy, and community resources to address weight-related health disparities.

    PubMed

    Berge, Jerica M; Adamek, Margaret; Caspi, Caitlin; Loth, Katie A; Shanafelt, Amy; Stovitz, Steven D; Trofholz, Amanda; Grannon, Katherine Y; Nanney, Marilyn S

    2017-08-01

    Despite intense nationwide efforts to improve healthy eating and physical activity across the lifespan, progress has plateaued. Moreover, health inequities remain. Frameworks that integrate research, clinical practice, policy, and community resources to address weight-related behaviors are needed. Implementation and evaluation of integration efforts also remain a challenge. The purpose of this paper is to: (1) Describe the planning and development process of an integrator entity, HEAL (Healthy Eating and Activity across the Lifespan); (2) present outcomes of the HEAL development process including the HEAL vision, mission, and values statements; (3) define the planned integrator functions of HEAL; and (4) describe the ongoing evaluation of the integration process. HEAL team members used a theoretically-driven, evidence-based, systemic, twelve-month planning process to guide the development of HEAL and to lay the foundation for short- and long-term integration initiatives. Key development activities included a review of the literature and case studies, identifying guiding principles and infrastructure needs, conducting stakeholder/key informant interviews, and continuous capacity building among team members. Outcomes/deliverables of the first year of HEAL included a mission, vision, and values statements; definitions of integration and integrator functions and roles; a set of long-range plans; and an integration evaluation plan. Application of the HEAL integration model is currently underway through community solicited initiatives. Overall, HEAL aims to lead real world integrative work that coalesce across research, clinical practice, and policy with community resources to inspire a culture of health equity aimed at improving healthy eating and physical activity across the lifespan. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Characteristics of individuals with integrated pensions.

    PubMed

    Bender, K A

    1999-01-01

    Employer pensions that integrate benefits with Social Security have been the focus of relatively little research. Since changes in Social Security benefit levels and other program characteristics can affect the benefit levels and other features of integrated pension plans, it is important to know who is covered by these plans. This article examines the characteristics of workers covered by integrated pension plans, compared to those with nonintegrated plans and those with no pension coverage. Integrated pension plans are those that explicitly adjust their benefit structure to help compensate for the employer's contributions to the Social Security program. There are two basic integration methods used by defined benefit (DB) plans. The offset method causes a reduction in employer pension benefits by up to half of the Social Security retirement benefit; the excess rate method is characterized by an accrual rate that is lower for earnings below the Social Security taxable maximum than above it. Defined contribution (DC) pension plans can be integrated along the lines of the excess rate method. To date, research on integrated pensions has focused on plan characteristics, as reported to the Bureau of Labor Statistics (BLS) through its Employee Benefits Survey (EBS). This research has examined the prevalence of integration among full-time, private sector workers by industry, firm size, and broad occupational categories. However, because the EBS provides virtually no data on worker characteristics, analyses of the effects of pension integration on retirement benefits have used hypothetical workers, varying according to assumed levels of earnings and job tenure. This kind of analysis is not particularly helpful in examining the potential effects of changes in the Social Security program on workers' pension benefits. However, data on pension integration at the individual level are available, most recently from the Health and Retirement Study (HRS), a nationally representative survey of individuals aged 51-61 in 1992. This dataset provides the basis for the analysis presented here. The following are some of the major findings from this analysis. The incidence of pension integration in the HRS sample is 32 percent of all workers with a pension (14 percent of all workers). The HRS can also identify integrated DC plans, a statistic that is not available from BLS data. The rate of integration for workers with only DC plans is 8 percent. After controlling for other variables, several socio-demographic characteristics are significantly related to the incidence of integration. The probability of having an integrated pension is 4.6 percentage points less for men compared to women. Non-Hispanic blacks are 6.4 percentage points less likely than non-Hispanic whites to have integrated pensions. Union members are 14 percentage points less likely to have integrated pensions, while workers with less than a graduate level education are at least 15 percentage points more likely to have a pension that is integrated. Some earnings and pension characteristics are also significantly correlated with pension integration. Earnings are positively related, with the probability of having an integrated pension increasing by 2 percentage points for an increase of $1,000 in annual pay. An even larger effect comes from earning at or above the Social Security taxable maximum. Workers at or above this income level are 10 percentage points more likely to have an integrated plan, but for those with more than one plan the probability of pension integration goes up by 13 percentage points.

  8. Supervisory Presentation for Research, Information, Integration and Testing (SPRINT)

    DTIC Science & Technology

    2015-03-29

    autonomous UAVs in subsequent tests. The Vigilant Spirit Control Station ( VSCS ) is a test bed designed by the Air Force Research Laboratory for studying... VSCS has tactical situation displays (i.e., geo-spatial maps), vehicle status displays, route planning interfaces for creating vehicle flight plans...is considered one of those novel displays; Figure 2). The model builder software was integrated into the VSCS that constructs a mission model that is

  9. Integrated Resource Planning Model (IRPM)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Graham, T. B.

    2010-04-01

    The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as wellmore » as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.« less

  10. An operational information systems architecture for assessing sustainable transportation planning: principles and design.

    PubMed

    Borzacchiello, Maria Teresa; Torrieri, Vincenzo; Nijkamp, Peter

    2009-11-01

    This paper offers the description of an integrated information system framework for the assessment of transportation planning and management. After an introductory exposition, in the first part of the paper, a broad overview of international experiences regarding information systems on transportation is given, focusing in particular on the relationship between transportation system's performance monitoring and the decision-making process, and on the importance of this connection in the evaluation and planning process, in Italian and European cases. Next, the methodological design of an information system to support efficient and sustainable transportation planning and management aiming to integrate inputs from several different data sources is presented. The resulting framework deploys modular and integrated databases which include data stemming from different national or regional data banks and which integrate information belonging to different transportation fields. For this reason, it allows public administrations to account for many strategic elements that influence their decisions regarding transportation, both from a systemic and infrastructural point of view.

  11. The EPOS Architecture: Integrated Services for solid Earth Science

    NASA Astrophysics Data System (ADS)

    Cocco, Massimo; Consortium, Epos

    2013-04-01

    The European Plate Observing System (EPOS) represents a scientific vision and an IT approach in which innovative multidisciplinary research is made possible for a better understanding of the physical processes controlling earthquakes, volcanic eruptions, unrest episodes and tsunamis as well as those driving tectonics and Earth surface dynamics. EPOS has a long-term plan to facilitate integrated use of data, models and facilities from existing (but also new) distributed research infrastructures, for solid Earth science. One primary purpose of EPOS is to take full advantage of the new e-science opportunities coming available. The aim is to obtain an efficient and comprehensive multidisciplinary research platform for the Earth sciences in Europe. The EPOS preparatory phase (EPOS PP), funded by the European Commission within the Capacities program, started on November 1st 2010 and it has completed its first two years of activity. EPOS is presently mid-way through its preparatory phase and to date it has achieved all the objectives, milestones and deliverables planned in its roadmap towards construction. The EPOS mission is to integrate the existing research infrastructures (RIs) in solid Earth science warranting increased accessibility and usability of multidisciplinary data from monitoring networks, laboratory experiments and computational simulations. This is expected to enhance worldwide interoperability in the Earth Sciences and establish a leading, integrated European infrastructure offering services to researchers and other stakeholders. The Preparatory Phase aims at leveraging the project to the level of maturity required to implement the EPOS construction phase, with a defined legal structure, detailed technical planning and financial plan. We will present the EPOS architecture, which relies on the integration of the main outcomes from legal, governance and financial work following the strategic EPOS roadmap and according to the technical work done during the first two years in order to establish an effective implementation plan guaranteeing long term sustainability for the infrastructure and the associated services. We plan to describe the RIs to be integrated in EPOS and to illustrate the initial suite of integrated and thematic core services to be offered to the users. We will present examples of combined data analyses and we will address the importance of opening our research infrastructures to users from different communities. We will describe the use-cases identified so far in order to allow stakeholders and potential future users to understand and interact with the EPOS infrastructure. In this framework, we also discuss the global perspectives for data infrastructures in order to verify the coherency of the EPOS plans and present the EPOS contributions. We also discuss the international cooperation initiatives in which EPOS is involved emphasizing the implications for solid Earth data infrastructures. In particular, EPOS and the satellite Earth Observation communities are collaborating in order to promote the integration of data from in-situ monitoring networks and satellite observing systems. Finally, we will also discuss the priorities for the third year of activity and the key actions planned to better involve users in EPOS. In particular, we will discuss the work done to finalize the design phase as well as the activities to start the validation and testing phase of the EPOS infrastructure.

  12. Family Planning and Integration. IPPF Bibliography Series. November 1978.

    ERIC Educational Resources Information Center

    International Planned Parenthood Federation, London (England).

    This document is a bibliography of materials that present family planning in comprehensive programs for the alleviation of poverty and deprivation. It contains 141 entries. Some of the items describe projects or approaches in which family planning is combined with a single function such as midwifery. The other entries cover programs of varying…

  13. Research-Based Unit and Lesson Planning: Maximizing Student Achievement

    ERIC Educational Resources Information Center

    Pagliaro, Marie

    2012-01-01

    By integrating the best of current research and practice in curriculum planning this book presents that comprehensive topic in a manageable form. Examples throughout are representative of different grade levels and subjects areas. It should be understood at the outset that the content offered for curriculum planning is not a rigid prescriptive…

  14. Remote mission specialist - A study in real-time, adaptive planning

    NASA Technical Reports Server (NTRS)

    Rokey, Mark J.

    1990-01-01

    A high-level planning architecture for robotic operations is presented. The remote mission specialist integrates high-level directives with low-level primitives executable by a run-time controller for command of autonomous servicing activities. The planner has been designed to address such issues as adaptive plan generation, real-time performance, and operator intervention.

  15. An Integrated Curriculum for Kindergarten/First Grade Children Utilizing Project Approach.

    ERIC Educational Resources Information Center

    Hsu, Yuehkuei

    An integrated curriculum allows children's learning in all traditional subject areas to occur primarily through projects that the teachers plan and that reflect children's interests. This paper presents a curriculum web on Chinese festivals, specifically, the Chinese New Year, for kindergarten and first grade levels. The paper first presents a…

  16. Toward a space materials systems program

    NASA Technical Reports Server (NTRS)

    Vontiesenhausen, G. F.

    1981-01-01

    A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.

  17. An integrated regional planning/microsimulation model for the Buffalo/Niagara Falls area

    DOT National Transportation Integrated Search

    2010-04-01

    This presentation examines the major planning issues facing the Buffalo and Niagara Falls area, which include freight, cross border congestion, and domestic issues. A Transportation Analysis and Simulation System (TRANSIMS) model is discussed that co...

  18. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project - Gen-4 and Gen-5 Radio Plans

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2014-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.

  19. Personalised Care Plan Management Utilizing Guideline-Driven Clinical Decision Support Systems.

    PubMed

    Laleci Erturkmen, Gokce Banu; Yuksel, Mustafa; Sarigul, Bunyamin; Lilja, Mikael; Chen, Rong; Arvanitis, Theodoros N

    2018-01-01

    Older age is associated with an increased accumulation of multiple chronic conditions. The clinical management of patients suffering from multiple chronic conditions is very complex, disconnected and time-consuming with the traditional care settings. Integrated care is a means to address the growing demand for improved patient experience and health outcomes of multimorbid and long-term care patients. Care planning is a prevalent approach of integrated care, where the aim is to deliver more personalized and targeted care creating shared care plans by clearly articulating the role of each provider and patient in the care process. In this paper, we present a method and corresponding implementation of a semi-automatic care plan management tool, integrated with clinical decision support services which can seamlessly access and assess the electronic health records (EHRs) of the patient in comparison with evidence based clinical guidelines to suggest personalized recommendations for goals and interventions to be added to the individualized care plans.

  20. Integrating Personalized and Community Services for Mobile Travel Planning and Management

    NASA Astrophysics Data System (ADS)

    Yu, Chien-Chih

    Personalized and community services have been noted as keys to enhance and facilitate e-tourism as well as mobile applications. This paper aims at proposing an integrated service framework for combining personalized and community functions to support mobile travel planning and management. Major mobile tourism related planning and decision support functions specified include personalized profile management, information search and notification, evaluation and recommendation, do-it-yourself planning and design, community and collaboration management, auction and negotiation, transaction and payment, as well as trip tracking and quality control. A system implementation process with an example prototype is also presented for illustrating the feasibility and effectiveness of the proposed system framework, process model, and development methodology.

  1. Meeting CCS communication challenges head-on: Integrating communications, planning, risk assessment, and project management

    USGS Publications Warehouse

    Greenberg, S.; Gauvreau, L.; Hnottavange-Telleen, K.; Finley, R.; Marsteller, S.

    2011-01-01

    The Midwest Geological Sequestration Consortium, Schlumberger Carbon Services, and Archer Daniels Midland has implemented a comprehensive communications plan at the Illinois Basin - Decatur Project (IBDP), a one million metric tonne Carbon Capture and Storage project in Decatur, IL, USA funded by the U.S. Department of Energy's National Energy Technology Laboratory. The IBDP Communication Plan includes consortium information, funding and disclaimer citations, description of target audiences, media communications guidelines, paper and presentations guidelines, site visit information, crisis communication, on-site photography regulations, and other components. The creation, development, and implementation processes for the IBDP Communication Plan (the Plan) are shared in this paper. New communications challenges, such as how to address add-on research requests, data sharing and management, scope increase, and contract agreements have arisen since the Plan was completed in January 2009, resulting in development of new policies and procedures by project management. Integrating communications planning, risk assessment, and project management ensured that consistent, factual information was developed and incorporated into project planning, and constitutes the basis of public communications. Successful integration has allowed the IBDP to benefit from early identification and mitigation of the potential project risks, which allows more time to effectively deal with unknown and unidentified risks that may arise. Project risks and risks associated with public perception can be managed through careful planning and integration of communication strategies into project management and risk mitigation. ?? 2011 Published by Elsevier Ltd.

  2. Vehicle Integrated Propulsion Research for the Study of Health Management Capabilities

    NASA Technical Reports Server (NTRS)

    Lekki, John D.; Simon, Donald L.; Hunter, Gary W.; Woike, Mary; Tokars, Roger P.

    2012-01-01

    Presentation on vehicle integrated propulsion research results and planning. This research emphasizes the testing of advanced health management sensors and diagnostics in an aircraft engine that is operated through multiple baseline and fault conditions.

  3. Integration of prevention and care of sexually transmitted infections with family planning services: what is the evidence for public health benefits?

    PubMed Central

    Dehne, K. L.; Snow, R.; O'Reilly, K. R.

    2000-01-01

    It has been widely believed that, by combining the services for preventing and treating sexually transmitted infections (STI) with those for family planning (FP), STI coverage would increase and the combined service would be of higher quality and more responsive to the needs of women. So far, there is little concrete evidence that integration has had such an impact. Besides the absence of documentation, a clear definition of integration is lacking. We therefore carried out a comprehensive review of concrete experiences with integrated services, and present a summary of our findings in this article. The results indicate that the tasks of STI prevention, such as education for risk reduction and counselling, have been integrated into family planning services much more frequently than the tasks of STI diagnosis and treatment. Some STI/FP integration efforts appear to have been beneficial, for instance when the integration of STI/HIV prevention had a positive impact on client satisfaction, and on the acceptance of family planning. Less clear is whether STI prevention, when concentrated among traditional FP clients, is having a positive impact on STI risk behaviours or condom use. A few projects have reported increases in STI caseloads following integration. In some projects, FP providers were trained in STI case management, but few clients were subsequently treated. PMID:10859857

  4. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  5. A multi-modal approach to economic development in the metropolitan area transportation planning process

    DOT National Transportation Integrated Search

    2014-08-06

    This white paper provides a review of research and current practices of integrating economic development goals in metropolitan area transportation planning. The information presented is intended to serve as a technical resource for transportation pla...

  6. An innovative approach for distributed and integrated resources planning for the Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.

    1990-01-01

    This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.

  7. Shuttle free-flying teleoperator system experiment definition. Volume 3: program development requirements

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.

  8. International Academy of Astronautics 5th cosmic study--preparing for a 21st century program of integrated, Lunar and Martian exploration and development (executive summary).

    PubMed

    Koelle, H H; Stephenson, D G

    2003-04-01

    This report is an initial review of plans for a extensive program to survey and develop the Moon and to explore the planet Mars during the 21st century. It presents current typical plans for separate, associated and fully integrated programs of Lunar and Martian research, exploration and development, and concludes that detailed integrated plans must be prepared and be subject to formal criticism. Before responsible politicians approve a new thrust into space they will demand attractive, defensible, and detailed proposals that explain the WHEN, HOW and WHY of each stage of an expanded program of 21st century space research, development and exploration. In particular, the claims of daring, innovative, but untried systems must be compared with the known performance of existing technologies. The time has come to supersede the present haphazard approach to strategic space studies with a formal international structure to plan for future advanced space missions under the aegis of the world's national space agencies, and supported by governments and the corporate sector. c2002 Elsevier Science Ltd. All rights reserved.

  9. Integrating emergency services in an urban health system.

    PubMed

    Radloff, D; Blouin, A S; Larsen, L; Kripp, M E

    2000-03-01

    When planning for growth and management efficiency across urban health systems, economic and market factors present significant service line challenges and opportunities. This article describes the evolutionary integration of emergency services in St John Health System, a large, religious-sponsored health care system located in Detroit, Michigan. Critical business elements, including the System's vision, mission, and economic context, are defined as the framework for site-specific and System-wide planning. The impact of managed care and market changes prompted St John's clinicians and executives to explore how integrating emergency services could create a competitive market advantage.

  10. Integrated Systems for Education Information: A Business Plan for Managing North Carolina's Public School System. Management Summary Report.

    ERIC Educational Resources Information Center

    1984

    This report describes the North Carolina Department of Education's 5-year plan for establishing a statewide management information system. The system is intended to improve fiscal management, personnel administration, and administrative operations, and to ensure efficient resource use. Initial sections present highlights of the plan; background…

  11. A Framework for Corporate Strategic Planning: Philosophy, Process, and Practice. Paper P-97.

    ERIC Educational Resources Information Center

    Amara, Roy

    The objective of this booklet is to present an integrated picture of the philosophy, process, and practices of strategic planning in an organizational context. It is based on the premise that planning includes the design of a desired future as well as effective ways of bringing it about. Specifically, the document illustrates a planning…

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Werling, Eric

    This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.

  13. Integrated Wind Power Planning Tool

    NASA Astrophysics Data System (ADS)

    Rosgaard, M. H.; Giebel, G.; Nielsen, T. S.; Hahmann, A.; Sørensen, P.; Madsen, H.

    2012-04-01

    This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the working title "Integrated Wind Power Planning Tool". The project commenced October 1, 2011, and the goal is to integrate a numerical weather prediction (NWP) model with purely statistical tools in order to assess wind power fluctuations, with focus on long term power system planning for future wind farms as well as short term forecasting for existing wind farms. Currently, wind power fluctuation models are either purely statistical or integrated with NWP models of limited resolution. With regard to the latter, one such simulation tool has been developed at the Wind Energy Division, Risø DTU, intended for long term power system planning. As part of the PSO project the inferior NWP model used at present will be replaced by the state-of-the-art Weather Research & Forecasting (WRF) model. Furthermore, the integrated simulation tool will be improved so it can handle simultaneously 10-50 times more turbines than the present ~ 300, as well as additional atmospheric parameters will be included in the model. The WRF data will also be input for a statistical short term prediction model to be developed in collaboration with ENFOR A/S; a danish company that specialises in forecasting and optimisation for the energy sector. This integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting for its spatio-temporal dependencies, and depending on the prevailing weather conditions defined by the WRF output. The output from the integrated prediction tool constitute scenario forecasts for the coming period, which can then be fed into any type of system model or decision making problem to be solved. The high resolution of the WRF results loaded into the integrated prediction model will ensure a high accuracy data basis is available for use in the decision making process of the Danish transmission system operator, and the need for high accuracy predictions will only increase over the next decade as Denmark approaches the goal of 50% wind power based electricity in 2020, from the current 20%.

  14. Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carmichael, Laurence, E-mail: Laurence.carmichael@uwe.ac.uk; Barton, Hugh; Gray, Selena

    This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have andmore » their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: Black-Right-Pointing-Pointer Governance and policy barriers and facilitators to the integration of health into urban planning. Black-Right-Pointing-Pointer Review of literature on impact assessment methods used across the world. Black-Right-Pointing-Pointer Knowledge, partnerships, management/resources and processes can impede integration. Black-Right-Pointing-Pointer HIA evaluations prevail uncovering research opportunities for evaluating other techniques.« less

  15. An Overview of Integration and Test of the James Webb Space Telescope Integrated Science Instrument Module

    NASA Technical Reports Server (NTRS)

    Drury, Michael; Becker, Neil; Bos, Brent; Davila, Pamela; Frey, Bradley; Hylan, Jason; Marsh, James; McGuffey, Douglas; Novak, Maria; Ohl, Raymond; hide

    2007-01-01

    The James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (approx.40K). The JWST Observatory architecture includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) element that contains four science instruments (SI) including a Guider. The SIs and Guider are mounted to a composite metering structure with outer dimensions of 2.1x2.2x1.9m. The SI and Guider units are integrated to the ISIM structure and optically tested at NASA/Goddard Space Flight Center as an instrument suite using a high-fidelity, cryogenic JWST telescope simulator that features a 1.5m diameter powered mirror. The SIs are integrated and aligned to the structure under ambient, clean room conditions. SI performance, including focus, pupil shear and wavefront error, is evaluated at the operating temperature. We present an overview of the ISIM integration within the context of Observatory-level construction. We describe the integration and verification plan for the ISIM element, including an overview of our incremental verification approach, ambient mechanical integration and test plans and optical alignment and cryogenic test plans. We describe key ground support equipment and facilities.

  16. Life science payloads planning study integration facility survey results

    NASA Technical Reports Server (NTRS)

    Wells, G. W.; Brown, N. E.; Nelson, W. G.

    1976-01-01

    The integration facility survey effort described is structured to examine the facility resources needed to conduct life science payload (LSP) integration checkout activities at NASA-JSC. The LSP integration facility operations and functions are defined along with the LSP requirements for facility design. A description of available JSC life science facilities is presented and a comparison of accommodations versus requirements is reported.

  17. Integrated French and Spanish Curricula: Language Planning, Communicative, Linguistic and Cultural Interactions.

    ERIC Educational Resources Information Center

    Papalia, Anthony

    Two guides are presented to assist in organization of a thematic approach to instruction in French and Spanish that is helpful in integrating language and culture. Each booklet contains the following elements: (1) a general introduction to the factors that must be present in the teaching situation for real communication to take place, and to…

  18. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  19. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 3: Space power and thermal management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Viewgraphs of briefings from the SSTAC/ARTS review of the draft integrated technology plan on thermal power and thermal management are presented. Topics covered include: space energy conversion research and technology; space photovoltaic energy conversion; chemical energy conversion and storage; thermal energy conversion; power management; thermal management; space nuclear power; high capacity power; surface power and thermal management; space platforms power and thermal management; and project SELENE.

  20. New development of China's population programme.

    PubMed

    Peng, P

    1998-06-01

    This article presents excerpts of a speech presented by the State Family Planning Commissioner of China at the UNFPA headquarters. Madame Peng Peiyun indicated that China has adopted some new decision-making processes as a follow-up to the 1994 ICPD Plan of Action. President Jiang Zemin stated that sustainable development must be achieved as part of the movement toward modernization. China places great importance on balancing population growth, social production, economic development, resources, and the environment. In 1995, the State Family Planning Commission changed its guidelines and approaches by integrating family planning (FP) within socioeconomic development and shifting to an interest oriented program integrated with social restraints and integrating FP publicity and education with comprehensive services and modern management. The FP program should meet the needs for reproductive health and contraception and be integrated within poverty alleviation and economic development schemes in rural areas. The aim is to build happy and more civil-minded farming families. Attention should be directed to the interests of farmers and the physical and psychological health of women. Programs should be voluntary. Many poverty reduction programs operated in the early 1990s. Pilot programs were established in 1995, in 11 selected counties and urban districts. The aim was to improve grassroots efforts to meet clients' needs for quality reproductive health and contraception. In 1994, providers received upgrading of skills. As the most populous country in the world, China needs UNFPA support in stabilizing population growth.

  1. Computer integrated manufacturing/processing in the HPI. [Hydrocarbon Processing Industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yoshimura, J.S.

    1993-05-01

    Hydrocarbon Processing and Systemhouse Inc., developed a comprehensive survey on the status of computer integrated manufacturing/processing (CIM/CIP) targeted specifically to the unique requirements of the hydrocarbon processing industry. These types of surveys and other benchmarking techniques can be invaluable in assisting companies to maximize business benefits from technology investments. The survey was organized into 5 major areas: CIM/CIP planning, management perspective, functional applications, integration and technology infrastructure and trends. The CIM/CIP planning area dealt with the use and type of planning methods to plan, justify implement information technology projects. The management perspective section addressed management priorities, expenditure levels and implementationmore » barriers. The functional application area covered virtually all functional areas of organization and focused on the specific solutions and benefits in each of the functional areas. The integration section addressed the needs and integration status of the organization's functional areas. Finally, the technology infrastructure and trends section dealt with specific technologies in use as well as trends over the next three years. In February 1993, summary areas from preliminary results were presented at the 2nd International Conference on Productivity and Quality in the Hydrocarbon Processing Industry.« less

  2. UAS Integration in the NAS Project Overview: RTCA SC-228 Plenary DAA Working Group 5

    NASA Technical Reports Server (NTRS)

    Randall, Debra K.

    2014-01-01

    The presentation is intended to allow the public to know and understand NASA's plans for integrated test to allow them the opportunity to provide feedback and suggestions. The integrated testing will support verification and validation of the RTCA SC-228 UAS minimum operation performance standard requirements.

  3. The role of CQI in the strategic planning process.

    PubMed

    Sahney, V K; Warden, G L

    1993-01-01

    This article describes the strategic planning process used to define the health care needs of a region and to prepare Henry Ford Health System (HFHS) to meet the needs of the 21st century. It presents key applications of continuous quality improvement in the development and implementation of the strategic plans for HFHS; explains how HFHS adapted the Deming/Shewhart cycle of continuous improvement for the purpose of improving its planning process; and delineates how the strategic planning, financial planning, and quality planning processes have been integrated.

  4. Integrated risk management

    NASA Technical Reports Server (NTRS)

    Hunsucker, J. L.

    1993-01-01

    The purpose of this report is to first present a basis or foundation for the building of an integrated risk management plan and them to present the plan. The integration referred to is across both the temporal and the hierarchical dimensions. Complexity, consequence, and credibility seem to be driving the need for the consideration of risk. Reduction of personal bias and reproducibility of the decision making process seem to be driving the consideration of a formal risk plan. While risk can be used as either a selection tool or a control tool, this paper concentrates on the selection usage. Risk relies on stated purpose. The tightness of the definition of purpose and success is directly reflected in the definition and control of risk. Much of a risk management plan could be designed by the answers to the questions of why, what, who, when, and where. However, any plan must provide the following information about a threat or risk: likelihood, consequence, predictability, reliability, and reproducibility. While the environment at NASA is seen as warm, but not hot, for the introduction of a risk program, some encouragement is seen if the following problems are addressed: no champion, no commitment of resource, confused definitions, lack of direction and focus, a hard sell, NASA culture, many choices of assessment methods, and cost. The plan is designed to follow the normal method of doing work and is structured to follow either the work break down structure or a functional structure very well. The parts of the plan include: defining purpose and success, initial threat assessment, initial risk assessment, reconciling threats and parameters, putting part of the information down and factoring the information back into the decision process as it comes back up, and developing inferences. Two major suggestions are presented. One is to build an office of risk management to be used as a resource by managers in doing the risk process. Another is to form a pilot program to try out the details in the plan and modify the method where needed.

  5. [Reflections on and contributions to the Ministry of Health's Integrated Plan on Health Surveillance Actions for People Exposed to Pesticides].

    PubMed

    Moisés, Marcia; Machado, Jorge Mesquita Huet; Peres, Frederico; Hennington, Elida; Beltrami, Aramis Cardoso; Beltrami Neto, Adelcki Camilo

    2011-08-01

    This paper highlights the issue of human and environmental contamination caused by abusive and undue use of pesticides and of its consequences for human health and the environment. It seeks to present reflections on and contributions to the Ministry of Health's Integrated Plan on Health Surveillance Actions for People Exposed to Pesticides arising from the Federal District Assessment and Control Project for Human and Environmental Exposure. The methodology used in this study consisted of reading and analysis of reports from the aforementioned projects, as well as participating in preliminary meetings for drafting the General Coordination Plan for Environmental Health Surveillance and the workshop entitled "The integration of Occupational Health Surveillance and Sanitary Vigilance: the information issue." This was coordinated by the Occupational Health Working Group of the Brazilian Public Health Association and in meetings and workshops of the Federal District Project. The outcome of the discussions suggests that the investigation strategy used is a positive contribution and that the Federal District Project may serve as a pilot project for the Ministry of Health's Integrated Plan.

  6. Integrated Workforce Planning Model: A Proof of Concept

    NASA Technical Reports Server (NTRS)

    Guruvadoo, Eranna K.

    2001-01-01

    Recently, the Workforce and Diversity Management Office at KSC have launched a major initiative to develop and implement a competency/skill approach to Human Resource management. As the competency/skill dictionary is being elaborated, the need for a competency-based workforce-planning model is recognized. A proof of concept for such a model is presented using a multidimensional data model that can provide the data infrastructure necessary to drive intelligent decision support systems for workforce planing. The components of competency-driven workforce planning model are explained. The data model is presented and several schemes that would support the workforce-planning model are presented. Some directions and recommendations for future work are given.

  7. Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

    NASA Technical Reports Server (NTRS)

    Verma, Savita Arora

    2017-01-01

    This presentation describes the objectives and high level setup for the human-in-the-loop simulation of the integrated surface and airsapce simulation of the ATD-2 Integrated Arrival, Departure, Surface (IADS) system. The purpose of the simulation is to evaluate the functionality of the IADS system, including tactical surface scheduler, negotiation of departure times for the flights under Traffic Management Initiatives (TMIs), and data exchange between ATC Tower and airline Ramp. The same presentation was presented to serve the experiment review prior to the simulation.

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This intern report consists of the workshop handbook for the Comprehensive Environmental and Natural Resource Management Planning workshop presented by the Council of Energy Resource Tribes. The workshop objectives were to foster and awareness of integrated resource management rationale; present the fundamental elements of an integrated approach; explain what distinguishes this approach from mainstream strategies; discuss how worldview and philosophy shape action and policy; present ways in which philosophical dexterity promotes effective management; and identify opportunities to engage and participate in integrated management. Resource articles presented at the meeting have been removed for separate processing for inclusion on the datamore » base.« less

  9. Risk identification and reduction in integrated product teams

    NASA Technical Reports Server (NTRS)

    Batson, Robert G.

    1993-01-01

    This brief report summarizes research and planning conducted during Summer 1993 for MSFC on the subjects of risk identification, assessment, and management. Research findings are presented, citing useful references. The major output of this work, the AXAF-S Project Risk Management Plan is outlined.

  10. SEPAC software configuration control plan and procedures, revision 1

    NASA Technical Reports Server (NTRS)

    1981-01-01

    SEPAC Software Configuration Control Plan and Procedures are presented. The objective of the software configuration control is to establish the process for maintaining configuration control of the SEPAC software beginning with the baselining of SEPAC Flight Software Version 1 and encompass the integration and verification tests through Spacelab Level IV Integration. They are designed to provide a simplified but complete configuration control process. The intent is to require a minimum amount of paperwork but provide total traceability of SEPAC software.

  11. OSTA data systems planning workshop recommendations

    NASA Technical Reports Server (NTRS)

    Desjardins, R.

    1981-01-01

    The Integrated Discipline Requirements are presented, including the following needs: (1) quality data sets, (2) a systematic treatment of problems with present data, (3) a single integrated catalog or master directory, (4) continuity of data formats, (5) a standard geographic and time basis, (6) data delivery in terms of easy rather than immediate accessibility, (7) data archives, and (8) cooperation with user agencies.

  12. Integrated corridor management initiative : demonstration phase evaluation, San Diego technical capability analysis test plan.

    DOT National Transportation Integrated Search

    1998-11-01

    The purpose of this working paper is to present estimates of potential safety benefits resulting from full implementation of Intelligent Transportation Systems (ITS) in the United States. These estimates were derived by integrating results from a num...

  13. Results of a jet plume effects test on Rockwell International integrated space shuttle vehicle using a vehicle 5 configuration 0.02-scale model (88-OTS) in the 11 by 11 foot leg of the NASA/Ames Research Center unitary plan wind tunnel (IA19), volume 1

    NASA Technical Reports Server (NTRS)

    Nichols, M. E.

    1975-01-01

    Results are presented of jet plume effects test IA19 using a vehicle 5 configuration integrated space shuttle vehicle 0.02-scale model in the NASA/Ames Research Center 11 x 11-foot leg of the unitary plan wind tunnel. The jet plume power effects on the integrated vehicle static pressure distribution were determined along with elevon, main propulsion system nozzle, and solid rocket booster nozzle effectiveness and elevon hinge moments.

  14. Programmable Automated Welding System (PAWS)

    NASA Technical Reports Server (NTRS)

    Kline, Martin D.

    1994-01-01

    An ambitious project to develop an advanced, automated welding system is being funded as part of the Navy Joining Center with Babcock & Wilcox as the prime integrator. This program, the Programmable Automated Welding System (PAWS), involves the integration of both planning and real-time control activities. Planning functions include the development of a graphical decision support system within a standard, portable environment. Real-time control functions include the development of a modular, intelligent, real-time control system and the integration of a number of welding process sensors. This paper presents each of these components of the PAWS and discusses how they can be utilized to automate the welding operation.

  15. The Integrated Airport: Building a Successful NextGen Testbed

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade

    2009-02-18

    This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment.  NextGen refers to the program that will be initiated to modernize the US National Airspace.  As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success.  This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation. 

  16. Integrated tokamak modeling: when physics informs engineering and research planning

    NASA Astrophysics Data System (ADS)

    Poli, Francesca

    2017-10-01

    Simulations that integrate virtually all the relevant engineering and physics aspects of a real tokamak experiment are a power tool for experimental interpretation, model validation and planning for both present and future devices. This tutorial will guide through the building blocks of an ``integrated'' tokamak simulation, such as magnetic flux diffusion, thermal, momentum and particle transport, external heating and current drive sources, wall particle sources and sinks. Emphasis is given to the connection and interplay between external actuators and plasma response, between the slow time scales of the current diffusion and the fast time scales of transport, and how reduced and high-fidelity models can contribute to simulate a whole device. To illustrate the potential and limitations of integrated tokamak modeling for discharge prediction, a helium plasma scenario for the ITER pre-nuclear phase is taken as an example. This scenario presents challenges because it requires core-edge integration and advanced models for interaction between waves and fast-ions, which are subject to a limited experimental database for validation and guidance. Starting from a scenario obtained by re-scaling parameters from the demonstration inductive ``ITER baseline'', it is shown how self-consistent simulations that encompass both core and edge plasma regions, as well as high-fidelity heating and current drive source models are needed to set constraints on the density, magnetic field and heating scheme. This tutorial aims at demonstrating how integrated modeling, when used with adequate level of criticism, can not only support design of operational scenarios, but also help to asses the limitations and gaps in the available models, thus indicating where improved modeling tools are required and how present experiments can help their validation and inform research planning. Work supported by DOE under DE-AC02-09CH1146.

  17. REopt: A Platform for Energy System Integration and Optimization: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simpkins, T.; Cutler, D.; Anderson, K.

    2014-08-01

    REopt is NREL's energy planning platform offering concurrent, multi-technology integration and optimization capabilities to help clients meet their cost savings and energy performance goals. The REopt platform provides techno-economic decision-support analysis throughout the energy planning process, from agency-level screening and macro planning to project development to energy asset operation. REopt employs an integrated approach to optimizing a site?s energy costs by considering electricity and thermal consumption, resource availability, complex tariff structures including time-of-use, demand and sell-back rates, incentives, net-metering, and interconnection limits. Formulated as a mixed integer linear program, REopt recommends an optimally-sized mix of conventional and renewable energy, andmore » energy storage technologies; estimates the net present value associated with implementing those technologies; and provides the cost-optimal dispatch strategy for operating them at maximum economic efficiency. The REopt platform can be customized to address a variety of energy optimization scenarios including policy, microgrid, and operational energy applications. This paper presents the REopt techno-economic model along with two examples of recently completed analysis projects.« less

  18. Application of genetic algorithm in integrated setup planning and operation sequencing

    NASA Astrophysics Data System (ADS)

    Kafashi, Sajad; Shakeri, Mohsen

    2011-01-01

    Process planning is an essential component for linking design and manufacturing process. Setup planning and operation sequencing is two main tasks in process planning. Many researches solved these two problems separately. Considering the fact that the two functions are complementary, it is necessary to integrate them more tightly so that performance of a manufacturing system can be improved economically and competitively. This paper present a generative system and genetic algorithm (GA) approach to process plan the given part. The proposed approach and optimization methodology analyses the TAD (tool approach direction), tolerance relation between features and feature precedence relations to generate all possible setups and operations using workshop resource database. Based on these technological constraints the GA algorithm approach, which adopts the feature-based representation, optimizes the setup plan and sequence of operations using cost indices. Case study show that the developed system can generate satisfactory results in optimizing the setup planning and operation sequencing simultaneously in feasible condition.

  19. Obtaining mathematical models for assessing efficiency of dust collectors using integrated system of analysis and data management STATISTICA Design of Experiments

    NASA Astrophysics Data System (ADS)

    Azarov, A. V.; Zhukova, N. S.; Kozlovtseva, E. Yu; Dobrinsky, D. R.

    2018-05-01

    The article considers obtaining mathematical models to assess the efficiency of the dust collectors using an integrated system of analysis and data management STATISTICA Design of Experiments. The procedure for obtaining mathematical models and data processing is considered by the example of laboratory studies on a mounted installation containing a dust collector in counter-swirling flows (CSF) using gypsum dust of various fractions. Planning of experimental studies has been carried out in order to reduce the number of experiments and reduce the cost of experimental research. A second-order non-position plan (Box-Bencken plan) was used, which reduced the number of trials from 81 to 27. The order of statistical data research of Box-Benken plan using standard tools of integrated system for analysis and data management STATISTICA Design of Experiments is considered. Results of statistical data processing with significance estimation of coefficients and adequacy of mathematical models are presented.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nugent, Philip J; Omitaomu, Olufemi A; Parish, Esther S

    The urban climate is changing rapidly. Therefore, climate change and its projected impacts on environmental conditions must be considered in assessing and comparing urban planning alternatives. In this paper, we present an integrated framework for urban climate adaptation tool (Urban-CAT) that will help cities to plan for, rather than react to, possible risks. Urban-CAT will be developed as a scenario planning tool that is locally relevant to existing urban decision-making processes.

  1. Design and Operation of Power Systems with Large Amounts of Wind Power: Final Summary Report, IEA WIND Task 25, Phase Three 2012-2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holttinen, Hannele; Kiviluoma, Juha; Forcione, Alain

    2016-06-01

    This report summarizes recent findings on wind integration from the 16 countries participating in the International Energy Agency (IEA) Wind collaboration research Task 25 in 2012-2014. Both real experience and studies are reported. The national case studies address several impacts of wind power on electric power systems. In this report, they are grouped under long-term planning issues and short-term operational impacts. Long-term planning issues include grid planning and capacity adequacy. Short-term operational impacts include reliability, stability, reserves, and maximizing the value in operational timescales (balancing related issues). The first section presents variability and uncertainty of power system-wide wind power, andmore » the last section presents recent wind integration studies for higher shares of wind power. Appendix 1 provides a summary of ongoing research in the national projects contributing to Task 25 in 2015-2017.« less

  2. Collaboration process for integrated social and health care strategy implementation.

    PubMed

    Korpela, Jukka; Elfvengren, Kalle; Kaarna, Tanja; Tepponen, Merja; Tuominen, Markku

    2012-01-01

    To present a collaboration process for creating a roadmap for the implementation of a strategy for integrated health and social care. The developed collaboration process includes multiple phases and uses electronic group decision support system technology (GDSS). A case study done in the South Karelia District of Social and Health Services in Finland during 2010-2011. An expert panel of 13 participants was used in the planning process of the strategy implementation. The participants were interviewed and observed during the case study. As a practical result, a roadmap for integrated health and social care strategy implementation has been developed. The strategic roadmap includes detailed plans of several projects which are needed for successful integration strategy implementation. As an academic result, a collaboration process to create such a roadmap has been developed. The collaboration process and technology seem to suit the planning process well. The participants of the meetings were satisfied with the collaboration process and the GDSS technology. The strategic roadmap was accepted by the participants, which indicates satisfaction with the developed process.

  3. ROUTES: a computer program for preliminary route location.

    Treesearch

    S.E. Reutebuch

    1988-01-01

    An analytical description of the ROUTES computer program is presented. ROUTES is part of the integrated preliminary harvest- and transportation-planning software package, PLANS. The ROUTES computer program is useful where grade and sideslope limitations are important in determining routes for vehicular travel. With the program, planners can rapidly identify route...

  4. Integrated Extravehicular Activity Human Research Plan: 2017

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew

    2017-01-01

    Multiple organizations within NASA as well as industry and academia fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Human Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Human Research Plan will be conducted annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the preliminary Integrated EVA Human Research Plan are presented including description of ongoing and planned research activities in the areas of: physiological and performance capabilities; suit design parameters; EVA human health and performance modeling; EVA tasks and concepts of operations; EVA informatics; human-suit sensors; suit sizing and fit; and EVA injury risk and mitigation. This paper represents the 2017 update to the Integrated EVA Human Research Plan.

  5. Designing sustainable and economically attractive brownfield revitalization options using an integrated assessment model.

    PubMed

    Schädler, S; Morio, M; Bartke, S; Rohr-Zänker, R; Finkel, M

    2011-03-01

    We describe the development of an integrated assessment model which evaluates redevelopment options of large contaminated brownfields and we present the application of the model in a case study. Aiming to support efficient and sustainable revitalization and communication between stakeholders, the presented assessment model integrates three pinnacles of brownfield revitalization: (i) subsurface remediation and site preparation costs, (ii) market-oriented economic appraisal, and (iii) the expected contribution of planned future land use to sustainable community and regional development. For the assessment, focus is set on the early stage of the brownfield redevelopment process, which is characterized by limited data availability and by flexibility in land use planning and development scope. At this stage, revealing the consequences of adjustments and alterations in planning options can foster efficiency in communication between the involved parties and thereby facilitates the brownfield revitalization process. Results from the case-study application indicate that the integrated assessment provides help in the identification of land use options beneficial in both a sustainable and an economical sense. For the study site it is shown on one hand that brownfield redevelopment is not automatically in line with sustainable regional development, and on the other hand it is demonstrated that additional contributions to sustainability are not intrinsically tied to increased costs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  6. An adequacy-constrained integrated planning method for effective accommodation of DG and electric vehicles in smart distribution systems

    NASA Astrophysics Data System (ADS)

    Tan, Zhukui; Xie, Baiming; Zhao, Yuanliang; Dou, Jinyue; Yan, Tong; Liu, Bin; Zeng, Ming

    2018-06-01

    This paper presents a new integrated planning framework for effective accommodating electric vehicles in smart distribution systems (SDS). The proposed method incorporates various investment options available for the utility collectively, including distributed generation (DG), capacitors and network reinforcement. Using a back-propagation algorithm combined with cost-benefit analysis, the optimal network upgrade plan, allocation and sizing of the selected components are determined, with the purpose of minimizing the total system capital and operating costs of DG and EV accommodation. Furthermore, a new iterative reliability test method is proposed. It can check the optimization results by subsequently simulating the reliability level of the planning scheme, and modify the generation reserve margin to guarantee acceptable adequacy levels for each year of the planning horizon. Numerical results based on a 32-bus distribution system verify the effectiveness of the proposed method.

  7. Integrated Dynamic Process Planning and Scheduling in Flexible Manufacturing Systems via Autonomous Agents

    NASA Astrophysics Data System (ADS)

    Nejad, Hossein Tehrani Nik; Sugimura, Nobuhiro; Iwamura, Koji; Tanimizu, Yoshitaka

    Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. A negotiation protocol is discussed, in this paper, to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally, based on the alternative manufacturing processes. The alternative manufacturing processes are presented by the process plan networks discussed in the previous paper, and the suitable process plans and schedules are searched and generated to cope with both the dynamic status and the disturbances of the manufacturing systems. We initiatively combine the heuristic search algorithms of the process plan networks with the negotiation protocols, in order to generate suitable process plans and schedules in the dynamic manufacturing environment. A simulation software has been developed to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.

  8. Fly-By-Light/Power-By-Wire Requirements and Technology Workshop

    NASA Technical Reports Server (NTRS)

    Baker, Robert L. (Editor); Pitts, Felix L. (Editor)

    1992-01-01

    The results of the Fly-By-Light/Power-By-Wire (FBL/PBW) Workshop held on March 17-19, 1992, at the NASA Langley Research Center are presented. The FBL/PBW program is a joint NASA LeRC/LaRC effort to develop the technology base for confident application of integrated FBL/PBW systems to transport aircraft. The objectives of the workshop were to ascertain the FBL/PBW program technical requirements and satisfy the requirements and needs from the industry viewpoint, provide a forum for presenting and documenting alternative technical approaches which satisfy the requirements, and assess the plan adequacy in accomplishing plan objectives, aims, and technology transfer. Areas addressed were: optical sensor systems, power-by-wire systems, FBL/PBW fault-tolerant architectures, electromagnetic environment assessment, and system integration and demonstration. The workshop consisted of an introductory meeting, a 'keynote' presentation, a series of individual panel sessions covering the above areas, with midway presentations by the panel chairpersons, followed by a final summarizing/integrating session by the individual panels, and a closing plenary session summarizing the results of the workshop.

  9. Semantic Metadata for Heterogeneous Spatial Planning Documents

    NASA Astrophysics Data System (ADS)

    Iwaniak, A.; Kaczmarek, I.; Łukowicz, J.; Strzelecki, M.; Coetzee, S.; Paluszyński, W.

    2016-09-01

    Spatial planning documents contain information about the principles and rights of land use in different zones of a local authority. They are the basis for administrative decision making in support of sustainable development. In Poland these documents are published on the Web according to a prescribed non-extendable XML schema, designed for optimum presentation to humans in HTML web pages. There is no document standard, and limited functionality exists for adding references to external resources. The text in these documents is discoverable and searchable by general-purpose web search engines, but the semantics of the content cannot be discovered or queried. The spatial information in these documents is geographically referenced but not machine-readable. Major manual efforts are required to integrate such heterogeneous spatial planning documents from various local authorities for analysis, scenario planning and decision support. This article presents results of an implementation using machine-readable semantic metadata to identify relationships among regulations in the text, spatial objects in the drawings and links to external resources. A spatial planning ontology was used to annotate different sections of spatial planning documents with semantic metadata in the Resource Description Framework in Attributes (RDFa). The semantic interpretation of the content, links between document elements and links to external resources were embedded in XHTML pages. An example and use case from the spatial planning domain in Poland is presented to evaluate its efficiency and applicability. The solution enables the automated integration of spatial planning documents from multiple local authorities to assist decision makers with understanding and interpreting spatial planning information. The approach is equally applicable to legal documents from other countries and domains, such as cultural heritage and environmental management.

  10. Integrated environmental planning in the Philippines: A case study of the Palawan Integrated Environmental Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ganapin, D.J. Jr.

    1987-01-01

    Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less

  11. The effect of nanotechnology on education

    NASA Astrophysics Data System (ADS)

    Viriyavejakul, Chantana

    2008-04-01

    The research objective was to study 1) the situation and readiness of the Thai education for the integration of nanotechnology and 2) to propose the plans, the strategies and guidelines for educational reform to adapt nanotechnology to the system. The data collection was done by 4 methods: 1) documentary study, 2) observation, 3) informal interviews, and 4) group discussion. The findings revealed that: 1. William Wresch's Theory (1997) was used in this research to study of the situation and readiness of the Thai education for the integration of nanotechnology. 1) Getting connected to nanotechnology by search engine websites, libraries, magazines, books, and discussions with experts. 2) Curriculum integration: nanotechnology should be integrated in many branches of engineering, such as industrial, computer, civil, chemical, electrical, mechanical, etc. 3) Resources for educators: nanotechnology knowledge should be spread in academic circles by publications and the Internet websites. 4) Training and professional resources for teachers: Teachers should be trained by experts in nanotechnology and researchers from the National Nanotechnology Center. This will help trainees get correct knowledge, comprehension, and awareness in order to apply to their professions and businesses in the future. 2. As for the plans, the strategies, and guidelines for educational reform to adapt nanotechnology to the present system, I analyzed the world nanotechnology situation that might have an effect on Thai society. The study is based on the National Plan to Develop Nanotechnology. The goal of this plan is to develop nanotechnology to be the national strategy within 10 years (2004-2013) and have it integrated into the Thai system. There are 4 parts in this plan: 1) nanomaterials, 2) nanoelectronics, 3) nanobiotechnology, and 4) human resources development. Data for human resource development should be worked with the present technology and use the country's resources to produce many products of nanotechnology, such as 1) handicrafts, decorations, and gifts, 2) agricultural products and food, 3) beverages, such as alcoholic and non- alcoholic drinks, and 5) textiles.

  12. Water Reclamation and Reuse.

    PubMed

    Huang, Chunkai; Zeng, Ping; Yang, Sen; Shao, Yanxi; Liu, Yang

    2016-10-01

    A review of the literature published in 2015 on topics relating to water reclamation and reuse is presented. The review is divided into the following sections: (1) General: extent of reuse, research needs, guidelines and monitoring, health effects; (2) Treatment technologies: integrated process design, membrane treatment, membrane bioreactors, electrocoagulation, ion exchange and adsorption, disinfection, wetlands, managed aquifer recharge; (3) Planning and management: public acceptance and education, economics/pricing, water quality planning and management and project/case studies. Much of the water treatment research focuses on membrane treatment, integrated designs, and other innovative technologies.

  13. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 8: Aerothermodynamics Automation and Robotics (A/R) systems sensors, high-temperature superconductivity

    NASA Technical Reports Server (NTRS)

    1991-01-01

    Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.

  14. SSTAC/ARTS review of the draft Integrated Technology Plan (ITP). Volume 8: Aerothermodynamics Automation and Robotics (A/R) systems sensors, high-temperature superconductivity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Viewgraphs of briefings presented at the SSTAC/ARTS review of the draft Integrated Technology Plan (ITP) on aerothermodynamics, automation and robotics systems, sensors, and high-temperature superconductivity are included. Topics covered include: aerothermodynamics; aerobraking; aeroassist flight experiment; entry technology for probes and penetrators; automation and robotics; artificial intelligence; NASA telerobotics program; planetary rover program; science sensor technology; direct detector; submillimeter sensors; laser sensors; passive microwave sensing; active microwave sensing; sensor electronics; sensor optics; coolers and cryogenics; and high temperature superconductivity.

  15. Systems Engineering Management Plan NASA Traffic Aware Planner Integration Into P-180 Airborne Test-Bed

    NASA Technical Reports Server (NTRS)

    Maris, John

    2015-01-01

    NASA's Traffic Aware Planner (TAP) is a cockpit decision support tool that provides aircrew with vertical and lateral flight-path optimizations with the intent of achieving significant fuel and time savings, while automatically avoiding traffic, weather, and restricted airspace conflicts. A key step towards the maturation and deployment of TAP concerned its operational evaluation in a representative flight environment. This Systems Engineering Management Plan (SEMP) addresses the test-vehicle design, systems integration, and flight-test planning for the first TAP operational flight evaluations, which were successfully completed in November 2013. The trial outcomes are documented in the Traffic Aware Planner (TAP) flight evaluation paper presented at the 14th AIAA Aviation Technology, Integration, and Operations Conference, Atlanta, GA. (AIAA-2014-2166, Maris, J. M., Haynes, M. A., Wing, D. J., Burke, K. A., Henderson, J., & Woods, S. E., 2014).

  16. [Strategic health planning based on determinants: case of the municipality of Campo Bom, Rio Grande do Sul State. A methodological proposal for the decentralized management].

    PubMed

    González, Martín Maximino León

    2009-10-01

    With the purpose to analyze the health strategic planning model based on determinants experienced in the municipality of Campo Bom, Rio Grande do Sul State, it was conducted an observational, qualitative study, of documental analysis as well as an evaluation of new process technologies in local health administration. This study contains an analysis of the methodological coherency and applicability of this model, based on the revision of the elaborated plans. The plans presented at Campo Bom case shows the possibility of integration and applicability at local level, of a health strategic planning model oriented to the new health concepts considering elements of different theoretical developments that enables the response to the most common local needs and situations. It was identified evolutional stages of health planning and analyzed integrative elements of the model and limitations of its application, pointing to the need of support the deepening on the study and the development of the field.

  17. Systems design study of the Pioneer Venus spacecraft. Volume 2. Preliminary program development plan

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The preliminary development plan for the Pioneer Venus program is presented. This preliminary plan treats only developmental aspects that would have a significant effect on program cost. These significant development areas were: master program schedule planning; test planning - both unit and system testing for probes/orbiter/ probe bus; ground support equipment; performance assurance; and science integration Various test planning options and test method techniques were evaluated in terms of achieving a low-cost program without degrading mission performance or system reliability. The approaches studied and the methodology of the selected approach are defined.

  18. Integrating Vegetation and Green Infrastructure into Sustainable Transportation Planning

    EPA Science Inventory

    Paper reviewing presentations and discussions of the June, 2012 Vegeatation Workshop by organizers and presenters. Summarizes findings for TR News Sustainability special issue. TR News is part of the Transportation Research Board's publication portfolio (including Transportatio...

  19. Integrating Space Communication Network Capabilities via Web Portal Technologies

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Lee, Carlyn-Ann; Lau, Chi-Wung; Cheung, Kar-Ming; Levesque, Michael; Carruth, Butch; Coffman, Adam; Wallace, Mike

    2014-01-01

    We have developed a service portal prototype as part of an investigation into the feasibility of using Java portlet technology as a means of providing integrated access to NASA communications network services. Portal servers provide an attractive platform for this role due to the various built-in collaboration applications they can provide, combined with the possibility to develop custom inter-operating portlets to extent their functionality while preserving common presentation and behavior. This paper describes various options for integration of network services related to planning and scheduling, and results based on use of a popular open-source portal framework. Plans are underway to develop an operational SCaN Service Portal, building on the experiences reported here.

  20. The Integrated Airport: Building a Successful NextGen Testbed

    ScienceCinema

    Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade

    2018-01-24

    This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment.  NextGen refers to the program that will be initiated to modernize the US National Airspace.  As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success.  This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation. 

  1. A Structured Decision Approach for Integrating and Analyzing Community Perspectives in Re-Use Planning of Vacant Properties in Cleveland, Ohio

    EPA Science Inventory

    An integrated GIS-based, multi-attribute decision model deployed in a web-based platform is presented enabling an iterative, spatially explicit and collaborative analysis of relevant and available information for repurposing vacant land. The process incorporated traditional and ...

  2. Adaptive Counseling and Therapy: An Integrative, Eclectic Model.

    ERIC Educational Resources Information Center

    Howard, George S.; And Others

    1986-01-01

    Presents an integrative model, Adaptive Counseling and Therapy (ACT), for selecting a progression of therapist styles as clients move through developmental stages during the course of counseling and psychotherapy. ACT is intended to be useful to practitioners in case conceptualization and in the application of effective treatment planning.…

  3. Experiential Learning in Marketing Communications Courses: The Demarketing of College Binge-Drinking

    ERIC Educational Resources Information Center

    Rozensher, Susan G.; Seal, David S.

    2009-01-01

    The experiential learning approach has been gathering substantial momentum and support in educational circles. In the team-based experiential learning project presented here, which effectively integrated theory and application, students were charged with creating an integrated marketing communications plan to demarket binge drinking on the college…

  4. Correlating Computer Database Programs with Social Studies Instruction.

    ERIC Educational Resources Information Center

    Northwest Regional Educational Lab., Portland, OR.

    This unit emphasizes the integration of software in a focus on the classroom instruction process. Student activities are based on plans and ideas for instructional units presented by a teacher who describes and demonstrates the activities. Integration has occurred when computer applications are included in an instructional activity. This guide…

  5. An Integrated Systems Approach: A Description of an Automated Circulation Management System.

    ERIC Educational Resources Information Center

    Seifert, Jan E.; And Others

    These bidding specifications describe requirements for a turn-key automated circulation system for the University of Oklahoma Libraries. An integrated systems approach is planned, and requirements are presented for various subsystems: acquisitions, fund accounting, reserve room, and bibliographic and serials control. Also outlined are hardware…

  6. Service Animals in School. Position Statement

    ERIC Educational Resources Information Center

    Garret, Jennifer; Teskey, Carmen; Duncan, Kay; Strasser, Kathy

    2014-01-01

    It is the position of the National Association of School Nurses (NASN) that registered school nurses (hereinafter referred to as school nurses) are integral to the team planning process necessary to successfully integrate "service animals" into schools. A request to bring a service animal into the school setting presents questions due to…

  7. Hanford Double-Shell Tank AY-102 Radioactive Waste Leak Investigation Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washenfelder, Dennis J.

    2015-02-03

    The presentation outline is: Briefly review leak integrity status of tank AY-102 and current leak behavior; Summarize recent initiatives to understand leak mechanism and to verify integrity of remaining waste confinement structures; describe planned waste recovery activities; and, introduce other papers on tank AY-102 topics.

  8. Jackie Robinson, President Eisenhower, and the Little Rock Crisis.

    ERIC Educational Resources Information Center

    Vernon, John; And Others

    1997-01-01

    Presents background information and instructional materials for a lesson plan concerning the interaction between Jackie Robinson and President Eisenhower regarding the integration of public schools in Little Rock, Arkansas. Robinson chided the President for his cautious response to violent opposition to integration. Includes a copy of the…

  9. Integrating Transportation Modeling and Desktop GIS: A Practical and Affordable Analysis Tool for Small and Medium Sized Communities

    DOT National Transportation Integrated Search

    1998-09-16

    This paper and presentation discuss some of the benefits of integrating travel : demand models and desktop GIS (ArchInfo and ArcView for PCs) as a : cost-effective and staff saving tool, as well as specific improvements to : transportation planning m...

  10. Integrated watershed planning across jurisdictional boundaries

    NASA Astrophysics Data System (ADS)

    Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.

    2014-12-01

    We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.

  11. You Should be Dancin:! The Role of Performing Arts in the Lives of the Severely and Profoundly Handicapped.

    ERIC Educational Resources Information Center

    Barringer, Mary Dean

    The manual presents a program planning framework and teaching units for teaching dance and movement to severely and profoundly handicapped individuals. The planning framework contains four components: (1) aesthetic perception/multisensory integration; (2) creative expression; (3) dance heritage/historical and cultural; and (4) aesthetic…

  12. An Integrated Decision Support System for Planning and Measuring Institutional Efficiency. AIR 1992 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Minnaar, Phil C.

    This paper presents a model for obtaining and organizing managment information for decision making in university planning, developed by the Bureau for Management Information of the University of South Africa. The model identifies the fundamental entities of the university as environment, finance, physical facilities, assets, personnel, and…

  13. Collaborative e-Learning: e-Portfolios for Assessment, Teaching and Learning

    ERIC Educational Resources Information Center

    Luchoomun, Dharmadeo; McLuckie, Joe; van Wesel, Maarten

    2010-01-01

    This paper presents an innovative approach to e-learning by exploring a number of initiatives where there is a move towards collaborative use of Personal Development Plans (PDPs) integrated with e-portfolios as mechanisms for delivering such plans. It considers whether such a move towards more product orientated assessment might enhance student…

  14. Working Notes from the 1992 AAAI Spring Symposium on Practical Approaches to Scheduling and Planning

    NASA Technical Reports Server (NTRS)

    Drummond, Mark; Fox, Mark; Tate, Austin; Zweben, Monte

    1992-01-01

    The symposium presented issues involved in the development of scheduling systems that can deal with resource and time limitations. To qualify, a system must be implemented and tested to some degree on non-trivial problems (ideally, on real-world problems). However, a system need not be fully deployed to qualify. Systems that schedule actions in terms of metric time constraints typically represent and reason about an external numeric clock or calendar and can be contrasted with those systems that represent time purely symbolically. The following topics are discussed: integrating planning and scheduling; integrating symbolic goals and numerical utilities; managing uncertainty; incremental rescheduling; managing limited computation time; anytime scheduling and planning algorithms, systems; dependency analysis and schedule reuse; management of schedule and plan execution; and incorporation of discrete event techniques.

  15. GPS/INS integration by functional partitioning

    NASA Astrophysics Data System (ADS)

    Diesel, John W.

    It is shown that a GPS/INS system integrated by functional partitioning can satisfy all of the RTCA navigation requirements and goals. This is accomplished by accurately calibrating the INS using GPS after the inertial instruments are thermally stabilized and by exploiting the very slow subsequent error growth in the INS information. In this way, autonomous integrity monitoring can be achieved using only existing or presently planned systems.

  16. 49 CFR 244.15 - Subjects to be addressed in a Safety Integration Plan not involving an amalgamation of operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Subjects to be addressed in a Safety Integration... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.15 Subjects to be addressed in a Safety Integration Plan...

  17. Integrating the environment in local strategic planning : Guidelines (Case of Morocco)

    NASA Astrophysics Data System (ADS)

    Benbrahim, Hafsa

    2018-05-01

    Since 2010, an advanced regionalization project has been initiated by Morocco, which plans to consolidate the processes of decentralization and deconcentration by extending the powers of the regions and other local authorities. This project, institutionalized in the 2011 Constitution, defines the territorial organization of the Kingdom and reinforces decentralization according to a model of advanced regionalization. Through advanced regionalization, Morocco aims at integrated and sustainable development in economic, social, cultural and environmental terms, through the development of the potential and resources of each region. However, in order to honor this commitment of advanced regionalization, local authorities must be assisted in adopting a local strategic planning approach, allowing them to develop territorial plans for sustainable development in accordance with the national legal framework, specifically the Framework law 99-12, and international commitments in terms of environmental protection. This research deals with the issue of environmental governance in relation to the role and duties of local authorities. Thus, the main goal of our study is to present the guidelines to be followed by the local authorities to improve the quality of the environment integration process in the local strategic planning with the aim of putting it in a perspective of sustainable development.

  18. Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

    NASA Technical Reports Server (NTRS)

    Hitz, F. R.

    1976-01-01

    The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

  19. Human Frontal Lobes and AI Planning Systems

    NASA Technical Reports Server (NTRS)

    Levinson, Richard; Lum, Henry Jr. (Technical Monitor)

    1994-01-01

    Human frontal lobes are essential for maintaining a self-regulating balance between predictive and reactive behavior. This paper describes a system that integrates prediction and reaction based on neuropsychological theories of frontal lobe function. In addition to enhancing our understanding of deliberate action in humans' the model is being used to develop and evaluate the same properties in machines. First, the paper presents some background neuropsychology in order to set a general context. The role of frontal lobes is then presented by summarizing three theories which formed the basis for this work. The components of an artificial frontal lobe are then discussed from both neuropsychological and AI perspectives. The paper concludes by discussing issues and methods for evaluating systems that integrate planning and reaction.

  20. Picking the Best from the All-Resources Menu: Advanced Tools for Resource Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palmintier, Bryan S

    Introduces the wide range of electric power systems modeling types and associated questions they can help answer. The presentation focusses on modeling needs for high levels of Distributed Energy Resources (DERs), renewables, and inverter-based technologies as alternatives to traditional centralized power systems. Covers Dynamics, Production Cost/QSTS, Metric Assessment, Resource Planning, and Integrated Simulations with examples drawn from NREL's past and on-going projects. Presented at the McKnight Foundation workshop on 'An All-Resources Approach to Planning for a More Dynamic, Low-Carbon Grid' exploring grid modernization options to replace retiring coal plants in Minnesota.

  1. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  2. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  3. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  4. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  5. 49 CFR 244.11 - Contents of a Safety Integration Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...

  6. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    PubMed

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  7. Real-time path planning and autonomous control for helicopter autorotation

    NASA Astrophysics Data System (ADS)

    Yomchinda, Thanan

    Autorotation is a descending maneuver that can be used to recover helicopters in the event of total loss of engine power; however it is an extremely difficult and complex maneuver. The objective of this work is to develop a real-time system which provides full autonomous control for autorotation landing of helicopters. The work includes the development of an autorotation path planning method and integration of the path planner with a primary flight control system. The trajectory is divided into three parts: entry, descent and flare. Three different optimization algorithms are used to generate trajectories for each of these segments. The primary flight control is designed using a linear dynamic inversion control scheme, and a path following control law is developed to track the autorotation trajectories. Details of the path planning algorithm, trajectory following control law, and autonomous autorotation system implementation are presented. The integrated system is demonstrated in real-time high fidelity simulations. Results indicate feasibility of the capability of the algorithms to operate in real-time and of the integrated systems ability to provide safe autorotation landings. Preliminary simulations of autonomous autorotation on a small UAV are presented which will lead to a final hardware demonstration of the algorithms.

  8. Optimum-AIV: A planning and scheduling system for spacecraft AIV

    NASA Technical Reports Server (NTRS)

    Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.

    1991-01-01

    A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.

  9. Enterprise resource planning for hospitals.

    PubMed

    van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie

    2004-06-30

    Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.

  10. Integrating financial and strategic planning.

    PubMed

    Pivnicny, V C

    1989-09-01

    As hospitals face mounting profitability and liquidity concerns, the need to integrate strategic and financial planning also will continue to grow. This article describes a process for integrating these planning functions and the ideal organizational framework to facilitate the process. Obstacles to the integration of these planning processes also are discussed.

  11. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  12. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  13. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  14. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  15. 49 CFR 1106.3 - Actions for which Safety Integration Plan is required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A SIP...

  16. 49 CFR 1106.4 - The Safety Integration Plan process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...

  17. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project.

    PubMed

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D'Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-06-02

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site.

  18. Integrated Toolset for WSN Application Planning, Development, Commissioning and Maintenance: The WSN-DPCM ARTEMIS-JU Project

    PubMed Central

    Antonopoulos, Christos; Asimogloy, Katerina; Chiti, Sarah; D’Onofrio, Luca; Gianfranceschi, Simone; He, Danping; Iodice, Antonio; Koubias, Stavros; Koulamas, Christos; Lavagno, Luciano; Lazarescu, Mihai T.; Mujica, Gabriel; Papadopoulos, George; Portilla, Jorge; Redondo, Luis; Riccio, Daniele; Riesgo, Teresa; Rodriguez, Daniel; Ruello, Giuseppe; Samoladas, Vasilis; Stoyanova, Tsenka; Touliatos, Gerasimos; Valvo, Angela; Vlahoy, Georgia

    2016-01-01

    In this article we present the main results obtained in the ARTEMIS-JU WSN-DPCM project between October 2011 and September 2015. The first objective of the project was the development of an integrated toolset for Wireless sensor networks (WSN) application planning, development, commissioning and maintenance, which aims to support application domain experts, with limited WSN expertise, to efficiently develop WSN applications from planning to lifetime maintenance. The toolset is made of three main tools: one for planning, one for application development and simulation (which can include hardware nodes), and one for network commissioning and lifetime maintenance. The tools are integrated in a single platform which promotes software reuse by automatically selecting suitable library components for application synthesis and the abstraction of the underlying architecture through the use of a middleware layer. The second objective of the project was to test the effectiveness of the toolset for the development of two case studies in different domains, one for detecting the occupancy state of parking lots and one for monitoring air concentration of harmful gasses near an industrial site. PMID:27271622

  19. Application of scenario analysis and multiagent technique in land-use planning: a case study on Sanjiang wetlands.

    PubMed

    Yu, Huan; Ni, Shi-Jun; Kong, Bo; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources.

  20. Application of Scenario Analysis and Multiagent Technique in Land-Use Planning: A Case Study on Sanjiang Wetlands

    PubMed Central

    Ni, Shi-Jun; He, Zheng-Wei; Zhang, Cheng-Jiang; Zhang, Shu-Qing; Pan, Xin; Xia, Chao-Xu; Li, Xuan-Qiong

    2013-01-01

    Land-use planning has triggered debates on social and environmental values, in which two key questions will be faced: one is how to see different planning simulation results instantaneously and apply the results back to interactively assist planning work; the other is how to ensure that the planning simulation result is scientific and accurate. To answer these questions, the objective of this paper is to analyze whether and how a bridge can be built between qualitative and quantitative approaches for land-use planning work and to find out a way to overcome the gap that exists between the ability to construct computer simulation models to aid integrated land-use plan making and the demand for them by planning professionals. The study presented a theoretical framework of land-use planning based on scenario analysis (SA) method and multiagent system (MAS) simulation integration and selected freshwater wetlands in the Sanjiang Plain of China as a case study area. Study results showed that MAS simulation technique emphasizing quantitative process effectively compensated for the SA method emphasizing qualitative process, which realized the organic combination of qualitative and quantitative land-use planning work, and then provided a new idea and method for the land-use planning and sustainable managements of land resources. PMID:23818816

  1. Science IDEAS: A Research-Based K-5 Interdisciplinary Instructional Model Linking Science and Literacy

    ERIC Educational Resources Information Center

    Romance, Nancy R.; Vitale, Michael R.

    2012-01-01

    Science IDEAS is an evidence-based model that reflects interdisciplinary research findings that support the integration of literacy (e.g., reading comprehension) within science instruction in grades K-5. Presented is a framework for planning integrated science and literacy instruction in which six elements (hands-on investigations, reading,…

  2. Examining the Technology Integration Planning Cycle Model of Professional Development to Support Teachers' Instructional Practices

    ERIC Educational Resources Information Center

    Hutchison, Amy C.; Woodward, Lindsay

    2018-01-01

    Background: Presently, models of professional development aimed at supporting teachers' technology integration efforts are often short and decontextualized. With many schools across the country utilizing standards that require students to engage with digital tools, a situative model that supports building teachers' knowledge within their…

  3. Technology, Policy, and School Change: The Role of Intermediary Organizations

    ERIC Educational Resources Information Center

    Forthe, Darrell

    2012-01-01

    As educators work to advance 21st century teaching and learning in schools, numerous reforms are needed but none greater than the necessity to integrate technology. Technology integration presents complex challenges because numerous changes must take place. The National Education Technology Plan 2010 (NETP) provides a road map for these necessary…

  4. Polyvalent Adult Education Centre (An Integrated Approach to Adult Education for Workers).

    ERIC Educational Resources Information Center

    Koshy, T. A.; And Others

    A project to upgrade the vocational skills of Indian workers is presented. This project is designed to plan and develop integrated educational and training courses of various duration for workers and prospective workers, through the establishment of Polyvalent Centers. These centers are institutions providing opportunity for many-sided education…

  5. Integrated modelling of nitrate loads to coastal waters and land rent applied to catchment-scale water management.

    PubMed

    Refsgaard, A; Jacobsen, T; Jacobsen, B; Ørum, J-E

    2007-01-01

    The EU Water Framework Directive (WFD) requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized by intensive agricultural production and leakage of nitrate constitute a major pollution problem with respect groundwater aquifers (drinking water), fresh surface water systems (water quality of lakes) and coastal receiving waters (eutrophication). The case study presented illustrates an advanced modelling approach applied in river basin management. Point sources (e.g. sewage treatment plant discharges) and distributed diffuse sources (nitrate leakage) are included to provide a modelling tool capable of simulating pollution transport from source to recipient to analyse the effects of specific, localized basin water management plans. The paper also includes a land rent modelling approach which can be used to choose the most cost-effective measures and the location of these measures. As a forerunner to the use of basin-scale models in WFD basin water management plans this project demonstrates the potential and limitations of comprehensive, integrated modelling tools.

  6. An integrated system for interactive continuous learning of categorical knowledge

    NASA Astrophysics Data System (ADS)

    Skočaj, Danijel; Vrečko, Alen; Mahnič, Marko; Janíček, Miroslav; Kruijff, Geert-Jan M.; Hanheide, Marc; Hawes, Nick; Wyatt, Jeremy L.; Keller, Thomas; Zhou, Kai; Zillich, Michael; Kristan, Matej

    2016-09-01

    This article presents an integrated robot system capable of interactive learning in dialogue with a human. Such a system needs to have several competencies and must be able to process different types of representations. In this article, we describe a collection of mechanisms that enable integration of heterogeneous competencies in a principled way. Central to our design is the creation of beliefs from visual and linguistic information, and the use of these beliefs for planning system behaviour to satisfy internal drives. The system is able to detect gaps in its knowledge and to plan and execute actions that provide information needed to fill these gaps. We propose a hierarchy of mechanisms which are capable of engaging in different kinds of learning interactions, e.g. those initiated by a tutor or by the system itself. We present the theory these mechanisms are build upon and an instantiation of this theory in the form of an integrated robot system. We demonstrate the operation of the system in the case of learning conceptual models of objects and their visual properties.

  7. HRP Integrated Research Plan Analysis

    NASA Technical Reports Server (NTRS)

    Elliott, Todd

    2009-01-01

    The charts, that are the totality of this document, presents tasks, duration of the tasks, the start and finish of the tasks, and subtasks. Also presented are PERT charts that display the beginning, external milestones, and end points for the tasks, and sub tasks.

  8. Life sciences payload definition and integration study, task C and D. Volume 2: Payload definition, integration, and planning studies

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The Life Sciences Payload Definition and Integration Study was composed of four major tasks. Tasks A and B, the laboratory definition phase, were the subject of prior NASA study. The laboratory definition phase included the establishment of research functions, equipment definitions, and conceptual baseline laboratory designs. These baseline laboratories were designated as Maxi-Nom, Mini-30, and Mini-7. The outputs of Tasks A and B were used by the NASA Life Sciences Payload Integration Team to establish guidelines for Tasks C and D, the laboratory integration phase of the study. A brief review of Tasks A and B is presented provide background continuity. The tasks C and D effort is the subject of this report. The Task C effort stressed the integration of the NASA selected laboratory designs with the shuttle sortie module. The Task D effort updated and developed costs that could be used by NASA for preliminary program planning.

  9. The Teaching with Technology Instrument: Effectively Measuring Where Teachers Are and Planning for Staff Development.

    ERIC Educational Resources Information Center

    Atkins, Nancy E.; Vasu, Ellen S.

    1998-01-01

    Presents an instrument for planning for staff development to help identify how much teachers know about technology and its integration into the classroom. The Teaching with Technology Instrument's (TTI's) 46 items are grouped in three areas: writing and communication skills, information access and management, and construction and multimedia. The…

  10. 26 CFR 1.401(l)-4 - Special rules for railroad plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... paragraph (b)(2) or (b)(3) of this section for the plan year. (2) Single integration level method—(i) In general. A plan satisfies this paragraph (b)(2) if— (A) The plan specifies a single integration level for... percentage of such plan year compensation). (3) Two integration level method—(i) In general. A plan satisfies...

  11. Analysis of power sector efficiency improvements for an integrated utility planning process in Costa Rica

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waddle, D.B.; MacDonald, J.M.

    1990-01-01

    In an effort to analyze and document the potential for power sector efficiency improvements from generation to end-use, the Agency for International Development and the Government of Costa Rica are jointly conducting an integrated power sector efficiency analysis. Potential for energy and cost savings in power plants, transmission and distribution, and demand-side management programs are being evaluated. The product of this study will be an integrated investment plan for the Instituto Costarricense de Electricidad, incorporating both supply and demand side investment options. This paper presents the methodology employed in the study, as well as preliminary estimates of the results ofmore » the study. 14 refs., 4 figs., 5 tabs.« less

  12. Community College Management by Objectives: Process, Progress, Problems.

    ERIC Educational Resources Information Center

    Deegan, William L.; And Others

    The objectives of this book are: (1) to present a theoretical framework for management by objectives in community colleges, (2) to present information about alternative methods for conducting needs assessment and implementing management by objectives, (3) to present a framework for integrating academic and fiscal planning through management by…

  13. Data for decision making: strategic information tools for hospital management during a pandemic.

    PubMed

    Farias, Daniel R; Raffo, Lucrecia; Bacigalupo, Silvia; Cremaschi, Maria; Vence, Liliana; Ramos, Susana; Salguero, Ana; Claudio, Martin; Meites, Elissa; Cubito, Alejandro

    2010-10-01

    During the 2009 influenza A (H1N1) pandemic, Argentina's Hospital Nacional Profesor Alejandro Posadas, a referral center in the capital province of Buenos Aires, treated a large urban patient population. Beginning in April, after severe influenza had been reported in North America but before any suspected cases of H1N1 had been reported in Argentina, the authors formed a pandemic planning committee to direct our hospital's response. An important strategy of the management team was to create a single daily monitoring tool that could integrate multiple information sources. We describe our pandemic planning strategy so that it may serve as a template for other hospitals. We describe our integrated data management system and the indicators it measured. We also describe the iterative process used to develop these tools and the current versions we use in surveillance for possible new waves of pandemic influenza. We present 3 examples of strategic decision making applied to data from our integrated information system. Daily pandemic surveillance data motivated the planning committee to reallocate hospital resources to care for patients during the peak pandemic period. This report illustrates the importance of pandemic planning and advanced integrated information tools for management of a health care facility during a pandemic.

  14. Cost, cost-efficiency and cost-effectiveness of integrated family planning and HIV services.

    PubMed

    Shade, Starley B; Kevany, Sebastian; Onono, Maricianah; Ochieng, George; Steinfeld, Rachel L; Grossman, Daniel; Newmann, Sara J; Blat, Cinthia; Bukusi, Elizabeth A; Cohen, Craig R

    2013-10-01

    To evaluate costs, cost-efficiency and cost-effectiveness of integration of family planning into HIV services. Integration of family planning services into HIV care and treatment clinics. A cluster-randomized trial. Twelve health facilities in Nyanza, Kenya were randomized to integrate family planning into HIV care and treatment; six health facilities were randomized to (nonintegrated) standard-of-care with separately delivered family planning and HIV services. We assessed costs, cost-efficiency (cost per additional use of more effective family planning), and cost-effectiveness (cost per pregnancy averted) associated with the first year of integration of family planning into HIV care. More effective family planning methods included oral and injectable contraceptives, subdermal implants, intrauterine device, and female and male sterilization. We collected cost data through interviews with study staff and review of financial records to determine costs of service integration. Integration of services was associated with an average marginal cost of $841 per site and $48 per female patient. Average overall and marginal costs of integration were associated with personnel costs [initial ($1003 vs. $872) and refresher ($498 vs. $330) training, mentoring ($1175 vs. $902) and supervision ($1694 vs. $1636)], with fewer resources required for other fixed ($18 vs. $0) and recurring expenses ($471 vs. $287). Integration was associated with a marginal cost of $65 for each additional use of more effective family planning and $1368 for each pregnancy averted. Integration of family planning and HIV services is feasible, inexpensive to implement, and cost-efficient in the Kenyan setting, and thus supports current Kenyan integration policy.

  15. Soft tissue waxup and mock-up as key factors in a treatment plan: case presentation.

    PubMed

    Viana, Pedro Couto; Correia, André; Neves, Manuel; Kovacs, Zsolt; Neugbauer, Rudiger

    2012-01-01

    Rehabilitation of edentulous spaces in esthetic areas is a challenge to the clinician due to the loss of soft tissues. In these clinical situations, it would be desirable to evaluate and predict the gingival architecture to recover in the oral rehabilitation. To fulfill this need, the diagnostic wax should anticipate the final rehabilitation with the integration of hard and soft tissue. Thus, it is essential to produce a diagnostic waxup that integrates these two components that are simultaneously seeking to recreate the harmony of white and pink esthetic. This diagnostic waxup will be the basis for the creation of the provisional prosthesis and a soft tissue mock-up. After placing the provisional prosthesis in the mouth, the soft tissue mock-up can be applied to assess its esthetic impact at facial and intraoral level. Dentist and patient should objectively assess the appearance of the final result. After approval of this rehabilitation concept, the virtual surgical planning can be performed and the surgical guide can be designed, allowing the treatment to take place. This protocol allows the development of a rigorous treatment plan based on the integration of teeth and gingiva component. The waxup and the soft tissue mock-up play a significant role, since they allow an earlier evaluation of the esthetic result, better prosthetic and surgical planning, and it allows us to anticipate the need for gingiva-colored ceramics use. The authors present a clinical case report of the importance of the wax-up and soft tissue mock-up in the treatment plan.

  16. 2-Micron Triple-Pulse Integrated Path Differential Absorption Lidar Development for Simultaneous Airborne Column Measurements of Carbon Dioxide and Water Vapor in the Atmosphere

    NASA Technical Reports Server (NTRS)

    Singh, Upendra N.; Petros, Mulugeta; Refaat, Tamer F.; Yu, Jirong

    2016-01-01

    For more than 15 years, NASA Langley Research Center (LaRC) has contributed in developing several 2-micron carbon dioxide active remote sensors using the DIAL technique. Currently, an airborne 2-micron triple-pulse integrated path differential absorption (IPDA) lidar is under development at NASA LaRC. This paper focuses on the advancement of the 2-micron triple-pulse IPDA lidar development. Updates on the state-of-the-art triple-pulse laser transmitter will be presented including the status of wavelength control, packaging and lidar integration. In addition, receiver development updates will also be presented, including telescope integration, detection systems and data acquisition electronics. Future plan for IPDA lidar system for ground integration, testing and flight validation will be presented.

  17. Water resources planning based on complex system dynamics: A case study of Tianjin city

    NASA Astrophysics Data System (ADS)

    Zhang, X. H.; Zhang, H. W.; Chen, B.; Chen, G. Q.; Zhao, X. H.

    2008-12-01

    A complex system dynamic (SD) model focusing on water resources, termed as TianjinSD, is developed for the integrated and scientific management of the water resources of Tianjin, which contains information feedback that governs interactions in the system and is capable of synthesizing component-level knowledge into system behavior simulation at an integrated level, thus presenting reasonable predictive results for policy-making on water resources allocation and management. As for the Tianjin city, interactions among 96 components for 12 years are explored and four planning alternatives are chosen, one of which is based on the conventional mode assuming that the existing pattern of human activities will be prevailed, while the others are alternative planning designs based on the interaction of local authorities and planning researchers. Optimal mode is therefore obtained according to different scenarios when compared the simulation results for evaluation of different decisions and dynamic consequences.

  18. Plan of research for integrated soil moisture studies. Recommendations of the Soil Moisture Working Group

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Soil moisture information is a potentially powerful tool for applications in agriculture, water resources, and climate. At present, it is difficult for users of this information to clearly define their needs in terms of accuracy, resolution and frequency because of the current sparsity of data. A plan is described for defining and conducting an integrated and coordinated research effort to develop and refine remote sensing techniques which will determine spatial and temporal variations of soil moisture and to utilize soil moisture information in support of agricultural, water resources, and climate applications. The soil moisture requirements of these three different application areas were reviewed in relation to each other so that one plan covering the three areas could be formulated. Four subgroups were established to write and compile the plan, namely models, ground-based studies, aircraft experiments, and spacecraft missions.

  19. Control and Diagnosis in Integrated Product Development - Observations during the Development of an AGV

    NASA Astrophysics Data System (ADS)

    Stetter, R.; Simundsson, A.

    2015-11-01

    This paper is concerned with the integration of control and diagnosis functionalities into the development of complete systems which include mechanical, electrical and electronic subsystems. For the development of such systems the strategies, methods and tools of integrated product development have attracted significant attention during the last decades. Today, it is generally observed that product development processes of complex systems can only be successful if the activities in the different domains are well connected and synchronised and if an ongoing communication is present - an ongoing communication spanning the technical domains and also including functions such as production planning, marketing/distribution, quality assurance, service and project planning. Obviously, numerous approaches to tackle this challenge are present in scientific literature and in industrial practice, as well. Today, the functionality and safety of most products is to a large degree dependent on control and diagnosis functionalities. Still, there is comparatively little research concentrating on the integration of the development of these functionalities into the overall product development processes. The main source of insight of the presented research is the product development process of an Automated Guided Vehicle (AGV) which is intended to be used on rough terrain. The paper starts with a background describing Integrated Product Development. The second section deals with the product development of the sample product. The third part summarizes some insights and formulates first hypotheses concerning control and diagnosis in Integrated Product Development.

  20. LANDSAT supports data needs for EPA 208 planning. [water quality control and waste treatment management

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Excerpts from federal legislation and regulations mandating areawide waster treatment management as a means of restoring and maintaining the integrity of the nation's water are presented along with requirements for grants to the states for water quality planning, management, and implementation. Experiences using LANDSAT to identify nonpoint sources of water pollution as well as land/use/land cover features in South Dakota, Kentucky, Georgia, New Jersey, and Texas are described. Present activities suggest that this type of remote sensing is an efficient, effective tool for areawide water quality planning. Interaction with cognizant federal, state, and local government personnel involved in EPA section 208 planning activities can guide the development of new capabilities and enhance their utility and prospect for use.

  1. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 5: Systems engineering/integration research and technology

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.

  2. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  3. Remote sensing and GIS for land use/cover mapping and integrated land management: case from the middle Ganga plain

    NASA Astrophysics Data System (ADS)

    Singh, R. B.; Kumar, Dilip

    2012-06-01

    In India, land resources have reached a critical stage due to the rapidly growing population. This challenge requires an integrated approach toward harnessing land resources, while taking into account the vulnerable environmental conditions. Remote sensing and Geographical Information System (GIS) based technologies may be applied to an area in order to generate a sustainable development plan that is optimally suited to the terrain and to the productive potential of the local resources. The present study area is a part of the middle Ganga plain, known as Son-Karamnasa interfluve, in India. Alternative land use systems and the integration of livestock enterprises with the agricultural system have been suggested for land resources management. The objective of this paper is to prepare a land resource development plan in order to increase the productivity of land for sustainable development. The present study will contribute necessary input for policy makers to improve the socio-economic and environmental conditions of the region.

  4. Integrated Land-Water-Energy assessment using the Foreseer Tool

    NASA Astrophysics Data System (ADS)

    Allwood, Julian; Konadu, Dennis; Mourao, Zenaida; Lupton, Rick; Richards, Keith; Fenner, Richard; Skelton, Sandy; McMahon, Richard

    2016-04-01

    This study presents an integrated energy and resource modelling and visualisation approach, ForeseerTM, which characterises the interdependencies and evaluates the land and water requirement for energy system pathways. The Foreseer Tool maps linked energy, water and land resource futures by outputting a set of Sankey diagrams for energy, water and land, showing the flow from basic resource (e.g. coal, surface water, and forested land) through transformations (e.g. fuel refining and desalination) to final services (e.g. sustenance, hygiene and transportation). By 'mapping' resources in this way, policy-makers can more easily understand the competing uses through the identification of the services it delivers (e.g. food production, landscaping, energy), the potential opportunities for improving the management of the resource and the connections with other resources which are often overlooked in a traditional sector-based management strategy. This paper will present a case study of the UK Carbon Plan, and highlights the need for integrated resource planning and policy development.

  5. Open Tools for Integrated Modelling to Understand SDG development - The OPTIMUS program

    NASA Astrophysics Data System (ADS)

    Howells, Mark; Zepeda, Eduardo; Rogner, H. Holger; Sanchez, Marco; Roehrl, Alexander; Cicowiez, Matrin; Mentis, Dimitris; Korkevelos, Alexandros; Taliotis, Constantinos; Broad, Oliver; Alfstad, Thomas

    2016-04-01

    The recently adopted Sustainable Development Goals (SDGs) - a set of 17 measurable and time-bound goals with 169 associated targets for 2030 - are highly inclusive challenges before the world community ranging from eliminating poverty to human rights, inequality, a secure world and protection of the environment. Each individual goal or target by themselves present enormous tasks, taken together they are overwhelming. There strong and weak interlinkages, hence trade-offs and complementarities among goals and targets. Some targets may affect several goals while other goals and targets may conflict or be mutually exclusive (Ref). Meeting each of these requires the judicious exploitation of resource, with energy playing an important role. Such complexity demands to be addressed in an integrated way using systems analysis tools to support informed policy formulation, planning, allocation of scarce resources, monitoring progress, effectiveness and review at different scales. There is no one size fits all methodology that conceivably could include all goal and targets simultaneously. But there are methodologies encapsulating critical subsets of the goal and targets with strong interlinkages with a 'soft' reflection on the weak interlinkages. Universal food security or sustainable energy for all inherently support goals and targets on human rights and equality but possibly at the cost of biodiversity or desertification. Integrated analysis and planning tools are not yet commonplace at national universities - or indeed in many policy making organs. What is needed is a fundamental realignment of institutions and integrations of their planning processes and decision making. We introduce a series of open source tools to support the SDG planning and implementation process. The Global User-friendly CLEW Open Source (GLUCOSE) tool optimizes resource interactions and constraints; The Global Electrification Tool kit (GETit) provides the first global spatially explicit electrification simulator; A national CLEW tool allows for the optimization of national level integrated resource use and Macro-CLEW presents the same allowing for detailed economic-biophysical interactions. Finally open Model Management Infrastructure (MoManI) is presented that allows for the rapid prototyping of new additions to, or new resource optimization tools. Collectively these tools provide insights to some fifteen of the SDGs and are made publicly available with support to governments and academic institutions.

  6. Experiment for Integrating Dutch 3d Spatial Planning and Bim for Checking Building Permits

    NASA Astrophysics Data System (ADS)

    van Berlo, L.; Dijkmans, T.; Stoter, J.

    2013-09-01

    This paper presents a research project in The Netherlands in which several SMEs collaborated to create a 3D model of the National spatial planning information. This 2D information system described in the IMRO data standard holds implicit 3D information that can be used to generate an explicit 3D model. The project realized a proof of concept to generate a 3D spatial planning model. The team used the model to integrate it with several 3D Building Information Models (BIMs) described in the open data standard Industry Foundation Classes (IFC). Goal of the project was (1) to generate a 3D BIM model from spatial planning information to be used by the architect during the early design phase, and (2) allow 3D checking of building permits. The team used several technologies like CityGML, BIM clash detection and GeoBIM to explore the potential of this innovation. Within the project a showcase was created with a part of the spatial plan from the city of The Hague. Several BIM models were integrated in the 3D spatial plan of this area. A workflow has been described that demonstrates the benefits of collaboration between the spatial domain and the AEC industry in 3D. The research results in a showcase with conclusions and considerations for both national and international practice.

  7. 10 CFR 905.10 - Who must comply with the integrated resource planning and reporting regulations in this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Who must comply with the integrated resource planning and reporting regulations in this subpart? 905.10 Section 905.10 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.10 Who must comply with the integrated resource...

  8. 10 CFR 905.10 - Who must comply with the integrated resource planning and reporting regulations in this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Who must comply with the integrated resource planning and reporting regulations in this subpart? 905.10 Section 905.10 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.10 Who must comply with the integrated resource...

  9. Preservice Teachers' Use of the Technology Integration Planning Cycle to Integrate iPads into Literacy Instruction

    ERIC Educational Resources Information Center

    Hutchison, Amy; Colwell, Jamie

    2016-01-01

    The purpose of this case study was to examine preservice teachers' use of the Technology Integration Planning Cycle (TIPC; Hutchison & Woodward, 2014) to integrate iPads into literacy instruction. Analysis revealed two findings related to using the TIPC to plan instruction: (a) Though the TIPC provides a structured approach to planning that…

  10. Integrating Social Justice with Mathematics and Science: An Analysis of Student Teacher Lessons

    ERIC Educational Resources Information Center

    Garii, Barbara; Rule, Audrey C.

    2009-01-01

    Student teachers have difficulty planning lessons that fully integrate social justice with mathematics/science content. This study was a content analysis of 26 poster presentations of mathematics or science lessons incorporating social justice issues made by student teachers (20F, 6M) at a mid-sized college in central New York State. The presented…

  11. The Mass Media: An Integrated Unit. Resources.

    ERIC Educational Resources Information Center

    Dwyer, Barry

    1982-01-01

    A comprehensive approach to a critical study of the mass media is presented in this journal insert, which also provides a format for planning an integrated unit. The main section of the insert focuses on seven questions and their answers concerning: (1) selection of the topic, (2) justifying a mass media curriculum, (3) entry experience, (4)…

  12. Environmental Education in High Schools in Kosovo--A Teacher's Perspective

    ERIC Educational Resources Information Center

    Hyseni Spahiu, Mimoza; Korca, Bardha; Lindemann-Matthies, Petra

    2014-01-01

    The integration of education for sustainable development (ESD) into all levels of education is a key priority in Kosovo's environmental action plan. However, at present it is not even known how environmental education (EE) is integrated in the country's educational system. With the help of a written questionnaire and in-depth interviews with 18…

  13. An Evaluation Model To Select an Integrated Learning System in a Large, Suburban School District.

    ERIC Educational Resources Information Center

    Curlette, William L.; And Others

    The systematic evaluation process used in Georgia's DeKalb County School System to purchase comprehensive instructional software--an integrated learning system (ILS)--is described, and the decision-making model for selection is presented. Selection and implementation of an ILS were part of an instructional technology plan for the DeKalb schools…

  14. Towards Assessing the Human Trajectory Planning Horizon

    PubMed Central

    Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models. PMID:27936015

  15. Towards Assessing the Human Trajectory Planning Horizon.

    PubMed

    Carton, Daniel; Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk

    2016-01-01

    Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models.

  16. Conservation plan based on the concept of integrity

    NASA Astrophysics Data System (ADS)

    Yen, Y. N.; Cheng, C. F.

    2015-08-01

    Value based concept has been accepted as a universal principle for the conservation of Cultural Heritage. Authenticity and integrity are two main issues protecting those values. Authenticity is the major tool in the value assessment and integrity plays an important role in the procedure of conservation plan. From the perspective of integrity, this research explores the principle of conservation plan and discusses its relation with the restoration plan and urban plan. A conservation plan in Quing-Lin village, Kinmen, will be taken as an example for implementation. The research shows that a conservation plan with integrity in mind helps to clarify the conservation target areas and their buffer zones. It also serves as a tool for developing control and risk management. Cultural mapping is an efficient tool for the communication with stakeholders in the process of the conservation plan.

  17. Serving our communities better. Guidelines for planning and developing integrated delivery networks.

    PubMed

    Prybil, L; Golden, P; Ballance, X

    1995-04-01

    In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.

  18. Overlearned responses hinder S-R binding.

    PubMed

    Moeller, Birte; Frings, Christian

    2017-01-01

    Two mechanisms that are important for human action control are the integration of individual action plans (see Hommel, Müsseler, Aschersleben, & Prinz, 2001) and the automatization of overlearned actions to familiar stimuli (see Logan, 1988). In the present study, we analyzed the influence of automatization on action plan integration. Integration with pronunciation responses were compared for response incompatible word and nonword stimuli. Stimulus-response binding effects were observed for nonwords. In contrast, words that automatically triggered an overlearned pronunciation response were not integrated with pronunciation of a different word. That is, automatized response retrieval hindered binding effects regarding the retrieving stimulus and a new response. The results are a first indication of the way that binding and learning processes interact, and might also be a first step to understanding the more complex interdependency of the processes responsible for stimulus-response binding in action control and stimulus-response associations in learning research. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  19. 18 CFR 740.1 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... authorized by the Act and those related programs of other Federal agencies; (2) Integration of water conservation with State water management planning; (3) Integration of water quantity and water quality planning; (4) Integration of ground and surface water planning; (5) Planning for protection and management of...

  20. Better, Sooner, More Convenient? The reality of pursuing greater integration between primary and secondary healthcare providers in New Zealand

    PubMed Central

    Lovelock, Kirsten; Martin, Greg; Gauld, Robin; MacRae, Jayden

    2017-01-01

    Objectives: This article focuses on the results of evaluations of two business plans developed in response to a policy initiative which aimed to achieve greater integration between primary and secondary health providers in New Zealand. We employ the Consolidated Framework for Implementation Research to inform our analysis. The Better, Sooner, More Convenient policy programme involved the development of business plans and, within each business plan, a range of areas of focus and associated work-streams. Methods: The evaluations employed a mixed method multi-level case study design, involving qualitative face-to-face interviews with front-line staff, clinicians and management in two districts, one in the North Island and the other in the South Island, and an analysis of routine data tracked ambulatory sensitive hospitalisations and emergency department presentations. Two postal surveys were conducted, one focussing on the patient care experiences of integration and care co-ordination and the second focussing on the perspectives of health professionals in primary and secondary settings in both districts. Results: Both evaluations revealed non-significant changes in ambulatory sensitive hospitalisations and emergency department presentation rates and slow uneven progress with areas of focus and their associated work-streams. Our evaluations revealed a range of implementation issues, the barriers and facilitators to greater integration of healthcare services and the implications for those who were responsible for putting policy into practice. Conclusion: The business plans were shown to be overly ambitious and compromised by the size and scope of the business plans; dysfunctional governance arrangements and associated accountability issues; organisational inability to implement change quickly with appropriate and timely funding support; an absence of organisational structural change allowing parity with the policy objectives; barriers that were encountered because of inadequate attention to organisational culture; competing additional areas of focus within the same timeframe; and consequent overloading of front-line staff which led to workload stress, fatigue and disillusionment. Where success was achieved, this largely hinged on the enthusiasm of a small pool of front-line workers and their initial buy-into the idea of integrated care. PMID:28491307

  1. Better, Sooner, More Convenient? The reality of pursuing greater integration between primary and secondary healthcare providers in New Zealand.

    PubMed

    Lovelock, Kirsten; Martin, Greg; Gauld, Robin; MacRae, Jayden

    2017-01-01

    This article focuses on the results of evaluations of two business plans developed in response to a policy initiative which aimed to achieve greater integration between primary and secondary health providers in New Zealand. We employ the Consolidated Framework for Implementation Research to inform our analysis. The Better, Sooner, More Convenient policy programme involved the development of business plans and, within each business plan, a range of areas of focus and associated work-streams. The evaluations employed a mixed method multi-level case study design, involving qualitative face-to-face interviews with front-line staff, clinicians and management in two districts, one in the North Island and the other in the South Island, and an analysis of routine data tracked ambulatory sensitive hospitalisations and emergency department presentations. Two postal surveys were conducted, one focussing on the patient care experiences of integration and care co-ordination and the second focussing on the perspectives of health professionals in primary and secondary settings in both districts. Both evaluations revealed non-significant changes in ambulatory sensitive hospitalisations and emergency department presentation rates and slow uneven progress with areas of focus and their associated work-streams. Our evaluations revealed a range of implementation issues, the barriers and facilitators to greater integration of healthcare services and the implications for those who were responsible for putting policy into practice. The business plans were shown to be overly ambitious and compromised by the size and scope of the business plans; dysfunctional governance arrangements and associated accountability issues; organisational inability to implement change quickly with appropriate and timely funding support; an absence of organisational structural change allowing parity with the policy objectives; barriers that were encountered because of inadequate attention to organisational culture; competing additional areas of focus within the same timeframe; and consequent overloading of front-line staff which led to workload stress, fatigue and disillusionment. Where success was achieved, this largely hinged on the enthusiasm of a small pool of front-line workers and their initial buy-into the idea of integrated care.

  2. Educative Supervision in International Cooperation Contexts

    ERIC Educational Resources Information Center

    Ortiz, Ana; Valdivia-Moral, Pedro; Cachón, Javier; Prieto, Joel

    2015-01-01

    This present paper has got a clear goal: to contextualize education for development in the present moment, planning its evolution and the keys that characterize education collected from the most representative and up-to-date pieces of work. The experience that we present is integrated in a project developed in Paraguay that is expected to describe…

  3. Integrated payload and mission planning, phase 3. Volume 1: Integrated payload and mission planning process evaluation

    NASA Technical Reports Server (NTRS)

    Sapp, T. P.; Davin, D. E.

    1977-01-01

    The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.

  4. The United States commitment to international family planning and population programs.

    PubMed

    Piotrow, P T

    1973-01-01

    The U.S. government's policy towards birth control has changed from Eisenhower's opinion in 1959 that birth control was not the government's business to the present broad federal support allotted of family planning. The legistature was the main vehicle for mounting support of family planning with the approval of Presidents Kennedy, Johnson and Nixon. The Agency for International Development's budget for population activities in 1973 was $1,982,000,000 or 6.3% of its total foreign appropriations. Since family planning is an integral part of development, continued U.S. assistance in the field of population and family planning is necessary.

  5. Status, Plans, and Initial Results for ARES 1 Crew Launch Vehicle Aerodynamics

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Haynes, Davy A.; Taylor, Terry L.; Hall, Robert M.; Pamadi, Bandu N.; Seaford, C. Mark

    2006-01-01

    Following the completion of NASA's Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Exploration Launch Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented.

  6. Aircrew-aircraft integration: A summary of US Army research programs and plans

    NASA Technical Reports Server (NTRS)

    Key, D. L.; Aiken, E. W.

    1984-01-01

    A review of selected programs which illustrate the research efforts of the U.S. Army Aeromechanics Laboratory in the area of aircrew-aircraft integration is presented. Plans for research programs to support the development of future military rotorcraft are also described. The crew of a combat helicopter must, in general, perform two major functions during the conduct of a particular mission: flightpath control and mission management. Accordingly, the research programs described are being conducted in the same two major categories: (1) flightpath control, which encompasses the areas of handling qualities, stability and control, and displays for the pilot's control of the rotorcraft's flightpath, and (2) mission management, which includes human factors and cockpit integration research topics related to performance of navigation, communication, and aircraft systems management tasks.

  7. Planning Tripoli Metro Network by the Use of Remote Sensing Imagery

    NASA Astrophysics Data System (ADS)

    Alhusain, O.; Engedy, Gy.; Milady, A.; Paulini, L.; Soos, G.

    2012-08-01

    Tripoli, the capital city of Libya is going through significant and integrated development process, this development is expected to continue in the next few decades. The Libyan authorities have put it as their goal to develop Tripoli to an important metropolis in North Africa. To achieve this goal, they identified goals for the city's future development in all human, economic, cultural, touristic, and nonetheless infrastructure levels. On the infrastructure development level, among other things, they have identified the development of public transportation as one of the important development priorities. At present, public transportation in Tripoli is carried out by a limited capacity bus network alongside of individual transportation. However, movement in the city is characterized mainly by individual transportation with all its disadvantages such as traffic jams, significant air pollution with both carbon monoxide and dust, and lack of parking space. The Libyan authorities wisely opted for an efficient, modern, and environment friendly solution for public transportation, this was to plan a complex Metro Network as the backbone of public transportation in the city, and to develop and integrate the bus network and other means of transportation to be in harmony with the planned Metro network. The Metro network is planned to provide convenient connections to Tripoli International Airport and to the planned Railway station. They plan to build a system of Park and Ride (P+R) facilities at suitable locations along the Metro lines. This paper will present in details the planned Metro Network, some of the applied technological solutions, the importance of applying remote sensing and GIS technologies in different planning phases, and problems and benefits associated with the use of multi-temporal-, multi-format spatial data in the whole network planning phase.

  8. GIS-based integrated assessment and decision support system for land use planning in consideration of carbon sequestration benefits

    NASA Astrophysics Data System (ADS)

    Wang, Jun; Chen, J. M.; Li, Manchun; Ju, Weimin

    2007-06-01

    As the major eligible land use activities in the Clean Development Mechanism (CDM), afforestation and reforestation offer opportunities and potential economic benefits for developing countries to participate in carbon-trade in the potential international carbon (C) sink markets. However, the design and selection of appropriate afforestation and reforestation locations in CDM are complex processes which need integrated assessment (IA) of C sequestration (CS) potential, environmental effects, and socio-economic impacts. This paper promotes the consideration of CS benefits in local land use planning and presents a GIS-based integrated assessment and spatial decision support system (IA-SDSS) to support decision-making on 'where' and 'how' to afforest. It integrates an Integrated Terrestrial Ecosystem Carbon Model (InTEC) and a GIS platform for modeling regional long-term CS potential and assessment of geo-referenced land use criteria including CS consequence, and produces ranking of plantation schemes with different tree species using the Analytic hierarchy process (AHP) method. Three land use scenarios are investigated: (i) traditional land use planning criteria without C benefits, (ii) land use for CS with low C price, and (iii) land use for CS with high price. Different scenarios and consequences will influence the weights of tree-species selection in the AHP decision process.

  9. The Correlation of Geo-Ecological Environment and Mountain Urban planning

    NASA Astrophysics Data System (ADS)

    Yang, Chun; Zeng, Wei

    2018-01-01

    As a special area with the complex geological structure, mountain city is more prone to geological disasters. Due to air pollution, ground subsidence, serious water pollution, earthquakes and floods geo-ecological environment problems have become increasingly serious, mountain urban planning is facing more severe challenges. Therefore, this article bases on the correlation research of geo-ecological environment and mountain urban planning, and re-examins mountain urban planning from the perspective of geo-ecological, coordinates the relationship between the human and nature by geo-ecological thinking, raises the questions which urban planning need to pay attention. And advocates creating an integrated system of geo-ecological and mountain urban planning, analysis the status and dynamics of present mountain urban planning.

  10. Development of an Airborne Triple-Pulse 2-Micron Integrated Path Differential Absorption Lidar (IPDA) for Simultaneous Airborne Column Measurements of Carbon Dioxide and Water Vapor in the Atmosphere

    NASA Technical Reports Server (NTRS)

    Singh, Upendra N.; Petros, Mulugeta; Refaat, Tamer F.; Yu, Jirong; Antill, Charles W.; Remus, Ruben

    2016-01-01

    This presentation will provide status and details of an airborne 2-micron triple-pulse integrated path differential absorption (IPDA) lidar being developed at NASA Langley Research Center with support from NASA ESTO Instrument Incubator Program. The development of this active optical remote sensing IPDA instrument is targeted for measuring both atmospheric carbon dioxide and water vapor in the atmosphere from an airborne platform. This presentation will focus on the advancement of the 2-micron triple-pulse IPDA lidar development. Updates on the state-of-the-art triple-pulse laser transmitter will be presented including the status of seed laser locking, wavelength control, receiver and detector upgrades, laser packaging and lidar integration. Future plan for IPDA lidar system for ground integration, testing and flight validation will also be presented.

  11. An Integrated Extravehicular Activity Research Plan

    NASA Technical Reports Server (NTRS)

    Abercromby, Andrew F. J.; Ross, Amy J.; Cupples, J. Scott

    2016-01-01

    Multiple organizations within NASA and outside of NASA fund and participate in research related to extravehicular activity (EVA). In October 2015, representatives of the EVA Office, the Crew and Thermal Systems Division (CTSD), and the Human Research Program (HRP) at NASA Johnson Space Center agreed on a formal framework to improve multi-year coordination and collaboration in EVA research. At the core of the framework is an Integrated EVA Research Plan and a process by which it will be annually reviewed and updated. The over-arching objective of the collaborative framework is to conduct multi-disciplinary cost-effective research that will enable humans to perform EVAs safely, effectively, comfortably, and efficiently, as needed to enable and enhance human space exploration missions. Research activities must be defined, prioritized, planned and executed to comprehensively address the right questions, avoid duplication, leverage other complementary activities where possible, and ultimately provide actionable evidence-based results in time to inform subsequent tests, developments and/or research activities. Representation of all appropriate stakeholders in the definition, prioritization, planning and execution of research activities is essential to accomplishing the over-arching objective. A formal review of the Integrated EVA Research Plan will be conducted annually. External peer review of all HRP EVA research activities including compilation and review of published literature in the EVA Evidence Book is already performed annually. Coordination with stakeholders outside of the EVA Office, CTSD, and HRP is already in effect on a study-by-study basis; closer coordination on multi-year planning with other EVA stakeholders including academia is being actively pursued. Details of the current Integrated EVA Research Plan are presented including description of ongoing and planned research activities in the areas of: Benchmarking; Anthropometry and Suit Fit; Sensors; Human-Suit Modeling; Suit Trauma Monitoring and Countermeasures; EVA Workload and Duration Effects; Decompression Sickness Risk Mitigation; Deconditioned EVA Performance; and Exploration EVA Concept of Operations.

  12. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    PubMed

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to strengthen systems to support health services, and ultimately establish an evidence base to inform investments in health care. More experience is needed to understand if the approach is feasible; similarly, more emphasis is needed on documenting the process of designing and implemented integrated interventions at the national level.

  13. Results of a Pressure Loads Investigation on a 0.030-scale Model (47-OTS) of the Integrated Space Shuttle Vehicle Configuration 5 in the NASA Ames Research Center 11 by 11 Foot Leg of the Unitary Plan Wind Tunnel (IA81A), Volume 1

    NASA Technical Reports Server (NTRS)

    Chee, E.

    1975-01-01

    Results of wind tunnel tests on a 0.030-scale model of the integrated space shuttle vehicle configuration 5 are presented. Testing was conducted in the NASA Ames Research Center 11 x 11 foot leg of the Unitary Plan Wind Tunnel to investigate pressure distributions for airloads analyses at Mach numbers from 0.9 through 1.4. Angles of attack and sideslip were varied from -6 to +6 degrees.

  14. Yavapai College Integrated Master Plan.

    ERIC Educational Resources Information Center

    Yavapai Coll., Prescott, AZ.

    This integrated master plan for Yavapai College (Arizona) includes the following six key components: (1) district services overview; (2) educational services plan; (3) human resources plan; (4) information technology services; (5) facilities plan; and (6) financial plan. The master plan was developed as a result of discussions and meetings with…

  15. Grid Integration Studies: Advancing Clean Energy Planning and Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Katz, Jessica; Chernyakhovskiy, Ilya

    2016-07-01

    Integrating significant variable renewable energy (VRE) into the grid requires an evolution in power system planning and operation. To plan for this evolution, power system stakeholders can undertake grid integration studies. This Greening the Grid document reviews grid integration studies, common elements, questions, and guidance for system planners.

  16. Airspace Technology Demonstration 2 (ATD-2) Integrated Surface and Airspace Simulation - Experiment Plan

    NASA Technical Reports Server (NTRS)

    Verma, Savita Arora; Jung, Yoon Chul

    2017-01-01

    This presentation describes the overview of the ATD-2 project and the integrated simulation of surface and airspace to evaluate the procedures of IADS system and evaluate surface metering capabilities via a high-fidelity human-in-the-loop simulation. Two HITL facilities, Future Flight Central (FFC) and Airspace Operations Laboratory (AOL), are integrated for simulating surface operations of the Charlotte-Douglas International Airport (CLT) and airspace in CLT TRACON and Washington Center.

  17. Organisational design for an integrated oncological department

    PubMed Central

    Meiss-de Haas, Ch.L.; Falkmann, H.; Douma, J.; van Gassel, J.G.; Peters, W.G.; van Mierlo, R.; van Turnhout, J.M.; Verhagen, C.A.H.H.V.M.; Schrijvers, A.J.P.

    2001-01-01

    Abstract Objective The outcomes of a Strength, Weakness, Opportunities and Threat (SWOT) analysis of three Integrated Oncological Departments were compared with their present situation three years later to define factors that can influence a successful implementation and development of an Integrated Oncological Department in- and outside (i.e. home care) the hospital. Research design Comparative Qualitative Case Study. Methods Auditing based on care-as-usual norms by an external, experienced auditing committee. Research setting Integrated Oncological Departments of three hospitals. Results Successful multidisciplinary care in an integrated, oncological department needs broad support inside the hospital and a well-defined organisational plan. PMID:16896411

  18. Integrated Care Planning for Cancer Patients: A Scoping Review

    PubMed Central

    Arthurs, Erin; Gradin, Sharon; MacKinnon, Marnie; Sussman, Jonathan; Kukreti, Vishal

    2017-01-01

    Introduction: There has been a growing emphasis on the use of integrated care plans to deliver cancer care. However little is known about how integrated care plans for cancer patients are developed including featured core activities, facilitators for uptake and indicators for assessing impact. Methods: Given limited consensus around what constitutes an integrated care plan for cancer patients, a scoping review was conducted to explore the components of integrated care plans and contextual factors that influence design and uptake. Results: Five types of integrated care plans based on the stage of cancer care: surgical, systemic, survivorship, palliative and comprehensive (involving a transition between stages) are described in current literature. Breast, esophageal and colorectal cancers were common disease sites. Multi-disciplinary teams, patient needs assessment and transitional planning emerged as key features. Provider buy-in and training alongside informational technology support served as important facilitators for plan uptake. Provider-level measurement was considerably less robust compared to patient and system-level indicators. Conclusions: Similarities in design features, components and facilitators across the various types of integrated care plans indicates opportunities to leverage shared features and enable a management lens that spans the trajectory of a patient’s journey rather than a phase-specific silo approach to care. PMID:29588638

  19. Green Streets, Green Jobs, Green Towns (G3) Integrated Planning

    EPA Pesticide Factsheets

    This page describes EPA's perspective on integrated planning to achieve the human health and water quality objectives of the Clean Water Act. It also provides links to several resources on integrated planning.

  20. Integration of landslide susceptibility products in the environmental plans

    NASA Astrophysics Data System (ADS)

    Fiorucci, Federica; Reichenbach, Paola; Rossi, Mauro; Cardinali, Mauro; Guzzetti, Fausto

    2015-04-01

    Landslides are one of the most destructive natural hazard that causes damages to urban area worldwide. The knowledge of where a landslide could occur is essential for the strategic management of the territory and for a good urban planning . In this contest landslide susceptibility zoning (LSZ) is crucial to provide information on the degree to which an area can be affected by future slope movements. Despite landslide susceptibility maps have been prepared extensively during the last decades, there are few examples of application is in the environmental plans (EP). In this work we present a proposal for the integration of the landslide inventory map with the following landslide susceptibility products: (i) landslide susceptibility zonation , (ii) the associated error map and (iii) the susceptibility uncertainty map. Moreover we proposed to incorporate detailed morphological studies for the evaluation of landslide risk associated to local parceling plan. The integration of all this information is crucial for the management of landslide risk in urban expansions forecasts. Municipality, province and regional administration are often not able to support the costs of landslide risk evaluation for extensive areas but should concentrate their financial resources to specific hazardous and unsafe situations defined by the result of the integration of landslide susceptibility products. Zonation and detail morphological analysis should be performed taking into account the existing laws and regulations, and could become a starting point to discuss new regulations for the landslide risk management.

  1. Biometric identification standards research

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  2. Fusion or confusion: knowledge or nonsense?

    NASA Astrophysics Data System (ADS)

    Rothman, Peter L.; Denton, Richard V.

    1991-08-01

    The terms 'data fusion,' 'sensor fusion,' multi-sensor integration,' and 'multi-source integration' have been used widely in the technical literature to refer to a variety of techniques, technologies, systems, and applications which employ and/or combine data derived from multiple information sources. Applications of data fusion range from real-time fusion of sensor information for the navigation of mobile robots to the off-line fusion of both human and technical strategic intelligence data. The Department of Defense Critical Technologies Plan lists data fusion in the highest priority group of critical technologies, but just what is data fusion? The DoD Critical Technologies Plan states that data fusion involves 'the acquisition, integration, filtering, correlation, and synthesis of useful data from diverse sources for the purposes of situation/environment assessment, planning, detecting, verifying, diagnosing problems, aiding tactical and strategic decisions, and improving system performance and utility.' More simply states, sensor fusion refers to the combination of data from multiple sources to provide enhanced information quality and availability over that which is available from any individual source alone. This paper presents a survey of the state-of-the- art in data fusion technologies, system components, and applications. A set of characteristics which can be utilized to classify data fusion systems is presented. Additionally, a unifying mathematical and conceptual framework within which to understand and organize fusion technologies is described. A discussion of often overlooked issues in the development of sensor fusion systems is also presented.

  3. Sustainable transport planning using GIS and remote sensing: an integrated approach

    NASA Astrophysics Data System (ADS)

    Giorgoudis, Marios D.; Hadjimitsis, Diofantos G.; Shiftan, Yoram

    2014-08-01

    The main advantage of using GIS is its ability to access and analyze spatially distributed data. The applications of GIS to transportation can be viewed as involving either on data retrieval; data integrator; or data analysis. The use of remote sensing can assist the retrieval of land use changes. Indeed, the integration of GIS and remote sensing will be used to fill the gap in the smart transport planning. A four step research is going to be done in order to try to integrate the usage of GIS and remote sensing to sustainable transport planning. The proposed research will be held in the city of Limassol, Cyprus. The data that are going to be used are data that are going to be collected through questionnaires, and other available data from the Cyprus Public Works Department and from the Remote Sensing Laboratory and Geo-Environment Research Lab of the Cyprus University of Technology. Overall, statistical analysis and market segmentation of data will be done, the land usage will be examined, and a scenario building on mode choice will be held. This paper presents an overview of the methodology that will be adopted.

  4. Planning and Instruction and the Social Studies Curriculum: A Discourse on Design and Delivery Systems.

    ERIC Educational Resources Information Center

    Peters, Richard

    A model for Continuous-Integrated-Sequential (C/I/S) curricula for social studies education is presented. The design advocated involves ensuring continuity of instruction from grades K-12, an integration of social studies disciplines, and a sequential process of refining and reinforcing concept and skills from grade-to-grade along the K-12…

  5. Integrated and Early Childhood Education: Preparation for Social Development. Theme D: Looking Forward - Integrated Participation in Processes of Change.

    ERIC Educational Resources Information Center

    Springer, Hugh

    This seminar paper presents an analysis of the many complex issues inherent in planning and implementing those educational interventions designed to accelerate human change so that it matches the pace of external change in traditional societies. After establishing the importance of sensitive periods when learning can be massive and intervention is…

  6. Are Integrated Plan Providers Associated With Lower Premiums on the Health Insurance Marketplaces?

    PubMed

    La Forgia, Ambar; Maeda, Jared Lane K; Banthin, Jessica S

    2018-04-01

    As the health insurance industry becomes more consolidated, hospitals and health systems have started to enter the insurance business. Insurers are also rapidly acquiring providers. Although these "vertically" integrated plan providers are small players in the insurance market, they are becoming more numerous. The health insurance marketplaces (HIMs) offer a unique setting to study integrated plan providers relative to other insurer types because the HIMs were designed to promote competition. In this descriptive study, the authors compared the premiums of the lowest priced silver plans of integrated plan providers with other insurer types on the 2015 and 2016 HIMs. Integrated plan providers were associated with modestly lower premiums relative to most other insurer types. This study provides early insights into premium competition on the HIMs. Examining integrated plan providers as a separate insurer type has important policy implications because they are a growing segment of the marketplaces and their pricing behavior may influence future premium trends.

  7. Integrating fire management analysis into land management planning

    Treesearch

    Thomas J. Mills

    1983-01-01

    The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...

  8. Integrating the healthcare enterprise in radiation oncology plug and play--the future of radiation oncology?

    PubMed

    Abdel-Wahab, May; Rengan, Ramesh; Curran, Bruce; Swerdloff, Stuart; Miettinen, Mika; Field, Colin; Ranjitkar, Sunita; Palta, Jatinder; Tripuraneni, Prabhakar

    2010-02-01

    To describe the processes and benefits of the integrating healthcare enterprises in radiation oncology (IHE-RO). The IHE-RO process includes five basic steps. The first step is to identify common interoperability issues encountered in radiation treatment planning and the delivery process. IHE-RO committees partner with vendors to develop solutions (integration profiles) to interoperability problems. The broad application of these integration profiles across a variety of vender platforms is tested annually at the Connectathon event. Demonstration of the seamless integration and transfer of patient data to the potential users are then presented by vendors at the public demonstration event. Users can then integrate these profiles into requests for proposals and vendor contracts by institutions. Incorporation of completed integration profiles into requests for proposals can be done when purchasing new equipment. Vendors can publish IHE integration statements to document the integration profiles supported by their products. As a result, users can reference integration profiles in requests for proposals, simplifying the systems acquisition process. These IHE-RO solutions are now available in many of the commercial radiation oncology-related treatment planning, delivery, and information systems. They are also implemented at cancer care sites around the world. IHE-RO serves an important purpose for the radiation oncology community at large. Copyright 2010 Elsevier Inc. All rights reserved.

  9. Opportunities and challenges in developing a whole-of-government national food and nutrition policy: lessons from Australia's National Food Plan.

    PubMed

    Carey, Rachel; Caraher, Martin; Lawrence, Mark; Friel, Sharon

    2016-01-01

    The present article tracks the development of the Australian National Food Plan as a 'whole of government' food policy that aimed to integrate elements of nutrition and sustainability alongside economic objectives. The article uses policy analysis to explore the processes of consultation and stakeholder involvement in the development of the National Food Plan, focusing on actors from the sectors of industry, civil society and government. Existing documentation and submissions to the Plan were used as data sources. Models of health policy analysis and policy streams were employed to analyse policy development processes. Australia. Australian food policy stakeholders. The development of the Plan was influenced by powerful industry groups and stakeholder engagement by the lead ministry favoured the involvement of actors representing the food and agriculture industries. Public health nutrition and civil society relied on traditional methods of policy influence, and the public health nutrition movement failed to develop a unified cross-sector alliance, while the private sector engaged in different ways and presented a united front. The National Food Plan failed to deliver an integrated food policy for Australia. Nutrition and sustainability were effectively sidelined due to the focus on global food production and positioning Australia as a food 'superpower' that could take advantage of the anticipated 'dining boom' as incomes rose in the Asia-Pacific region. New forms of industry influence are emerging in the food policy arena and public health nutrition will need to adopt new approaches to influencing public policy.

  10. Advanced Telescopes and Observatories Capability Roadmap Presentation to the NRC

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This viewgraph presentation provides an overview of the NASA Advanced Planning and Integration Office (APIO) roadmap for developing technological capabilities for telescopes and observatories in the following areas: Optics; Wavefront Sensing and Control and Interferometry; Distributed and Advanced Spacecraft; Large Precision Structures; Cryogenic and Thermal Control Systems; Infrastructure.

  11. Lifestyles: Past, Present, Future. A Unit to Integrate Economics in the Junior High Classroom.

    ERIC Educational Resources Information Center

    Hyler, Eric; Hyler, Linda

    Designed as a 4-9 week cumulative unit on economics for junior high school classes, this award-winning program introduces students to the economic bases of past, present, and future American lifestyles. Following introductory information on the authors, rationale, and objectives, a suggested 6-week lesson plan is presented designed to help…

  12. 26 CFR 1.401(l)-2 - Permitted disparity for defined contribution plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... plan must be uniform within the meaning of paragraph (c) of this section. (5) Integration level. The integration level specified in the plan must satisfy paragraph (d) of this section. (b) Maximum permitted... compensation at the excess contribution percentage. (d) Integration level—(1) In general. The integration level...

  13. Improving the integration of recreation management with management of other natural resources by applying concepts of scale from ecology.

    PubMed

    Morse, Wayde C; Hall, Troy E; Kruger, Linda E

    2009-03-01

    In this article, we examine how issues of scale affect the integration of recreation management with the management of other natural resources on public lands. We present two theories used to address scale issues in ecology and explore how they can improve the two most widely applied recreation-planning frameworks. The theory of patch dynamics and hierarchy theory are applied to the recreation opportunity spectrum (ROS) and the limits of acceptable change (LAC) recreation-planning frameworks. These frameworks have been widely adopted internationally, and improving their ability to integrate with other aspects of natural resource management has significant social and conservation implications. We propose that incorporating ecologic criteria and scale concepts into these recreation-planning frameworks will improve the foundation for integrated land management by resolving issues of incongruent boundaries, mismatched scales, and multiple-scale analysis. Specifically, we argue that whereas the spatially explicit process of the ROS facilitates integrated decision making, its lack of ecologic criteria, broad extent, and large patch size decrease its usefulness for integration at finer scales. The LAC provides explicit considerations for weighing competing values, but measurement of recreation disturbances within an LAC analysis is often done at too fine a grain and at too narrow an extent for integration with other recreation and resource concerns. We suggest that planners should perform analysis at multiple scales when making management decisions that involve trade-offs among competing values. The United States Forest Service is used as an example to discuss how resource-management agencies can improve this integration.

  14. Oral health care of the mentally retarded and other persons with disabilities in the Nordic countries: present situation and plans for the future.

    PubMed

    Haavio, M L

    1995-01-01

    In the Nordic countries, the general goal of policies for persons with disabilities is their integration into society. At the same time, the social and economic situation has worsened, and, as a consequence the structures of the welfare state seem gradually to break down. This paper describes the present situation and plans for the future of oral health care for the mentally retarded and others with disabilities in the changing society in the Nordic countries.

  15. Seeking a Human Spaceflight Program Worthy of a Great Nation. Review of U.S. Human Spaceflight Plans Committee

    DTIC Science & Technology

    2009-10-01

    human spaceflight plan is its affordability. In the way of background , Fig- ures 1-4, 1- 5 and 1-6 present the overall NASA bud- get trend over time...build upon the experience gained from prior ones. All as- sume a first flight to lunar orbit, and then to the Lagrange points, and then to near-Earth...and a description of the scenarios considered for inclusion in the integrated options presented in this report. 4.1.1 Background . The Space

  16. Pilot production & commercialization of LAPPD ™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Minot, Michael J.; Bennis, Daniel C.; Bond, Justin L.

    We present a progress update on plans to establish pilot production and commercialization of Large Area (400 cm2) Picosecond Photodetector (LAPPD™). Steps being taken to commercialize this MCP and LAPPD™ technology and begin tile pilot production are presented including (1) the manufacture of 203 mm×203 mm borosilicate glass capillary arrays (GCAs), (2) optimization of MCP performance and creation of an ALD coating facility to manufacture MCPs and (3) design, construction and commissioning of UHV tile integration and sealing facility to produce LAPPDs. Taken together these plans provide a “pathway toward commercialization”.

  17. 49 CFR 244.19 - Disposition.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.19 Disposition. (a) Standard of review. FRA reviews an applicant's Safety Integration Plan, and any amendments thereto, to determine whether it provides a...

  18. 49 CFR 244.19 - Disposition.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.19 Disposition. (a) Standard of review. FRA reviews an applicant's Safety Integration Plan, and any amendments thereto, to determine whether it provides a...

  19. 49 CFR 244.19 - Disposition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.19 Disposition. (a) Standard of review. FRA reviews an applicant's Safety Integration Plan, and any amendments thereto, to determine whether it provides a...

  20. 49 CFR 244.19 - Disposition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.19 Disposition. (a) Standard of review. FRA reviews an applicant's Safety Integration Plan, and any amendments thereto, to determine whether it provides a...

  1. 49 CFR 244.19 - Disposition.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.19 Disposition. (a) Standard of review. FRA reviews an applicant's Safety Integration Plan, and any amendments thereto, to determine whether it provides a...

  2. Integration of Land and Sea in a Port Area: A Case Study of the Port of Koper

    NASA Astrophysics Data System (ADS)

    Ažman Momirski, Lucija

    2017-10-01

    The spatial plan for a port based on land reclamation, existing land, or a combination of both should be designed in line with both reliable data for the existing situation and precise goals based on a well-founded vision by the port authority. In ports, human activities are concentrated in the limited space of the coastal belt, where they threaten the vulnerable equilibrium of the environment. Integrated multifunctional planning of ports is necessary for the sustainability of such plans. In this process, the relation between the environment and the economy is often neglected because the ecosystem—the totality of living organisms—which is fully dependent on biological, chemical, and physical factors, prevails. This method, also called building with nature, is the basis for integrated coastal zone development and management. It emphasizes the flexible integration of land and sea, which respects and uses forces and materials present in nature, and which is an essential interaction between man and environment. Strict ecological planning conditions and the public interest obliged the Port of Koper to modify its urban planning strategies and redefine its relationship with all bordering areas. The extension of two piers and construction of a third one was the result of functional factors, infrastructure connections, technical possibilities, and environmental requirements. Solutions that were relevant for distributing cargo on the docks had to adjust to the width of the basins for manoeuvring ships. Various types of construction restrict water flow under piers, thereby accelerating biomass degradation. Environmental aspects created conditions and requirements for pier construction.

  3. Integrated urban water planning: big picture planning is good for the wallet and the environment.

    PubMed

    Anderson, J; Iyaduri, R

    2003-01-01

    The demands on governments and local authorities are changing in response to community expectations for environmentally sustainable outcomes. To reverse declining water quality in rivers and ensure sustainable use in the 21st century, the State Government in New South Wales has introduced a package of Water Reforms. The introduction of integrated water, sewerage and drainage planning is one of the Water Reform initiatives. Traditionally, government and local authorities have managed their water supply, sewerage and stormwater drainage systems as separate entities. Integrated urban water planning is a structured planning process to evaluate concurrently the opportunities to improve the management of water, sewerage and drainage services within an urban area in ways which are consistent with broader catchment and river management objectives. The New South Wales Department of Land & Water Conservation (DLWC) has developed an integrated urban water planning process through a number of recent pilot studies. The process links urban water management objectives to overall catchment and river management objectives. DLWC is currently developing a set of guidelines for integrated urban water plans. DLWC has developed the Integrated Urban Water Planning methodology through three pilot studies in the New South Wales towns of Finley, Goulburn and Bombala. The pilot studies have shown that an integrated approach to water, sewerage and stormwater planning can identify opportunities that are not apparent when separate strategies are developed for each service. The result is better-integrated, more sustainable solutions, and substantial cost savings for local communities.

  4. PLAN2L: a web tool for integrated text mining and literature-based bioentity relation extraction.

    PubMed

    Krallinger, Martin; Rodriguez-Penagos, Carlos; Tendulkar, Ashish; Valencia, Alfonso

    2009-07-01

    There is an increasing interest in using literature mining techniques to complement information extracted from annotation databases or generated by bioinformatics applications. Here we present PLAN2L, a web-based online search system that integrates text mining and information extraction techniques to access systematically information useful for analyzing genetic, cellular and molecular aspects of the plant model organism Arabidopsis thaliana. Our system facilitates a more efficient retrieval of information relevant to heterogeneous biological topics, from implications in biological relationships at the level of protein interactions and gene regulation, to sub-cellular locations of gene products and associations to cellular and developmental processes, i.e. cell cycle, flowering, root, leaf and seed development. Beyond single entities, also predefined pairs of entities can be provided as queries for which literature-derived relations together with textual evidences are returned. PLAN2L does not require registration and is freely accessible at http://zope.bioinfo.cnio.es/plan2l.

  5. LANDSAT-D Mission Operations Review (MOR)

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.

  6. Health Workforce Planning

    PubMed Central

    Al-Sawai, Abdulaziz; Al-Shishtawy, Moeness M.

    2015-01-01

    In most countries, the lack of explicit health workforce planning has resulted in imbalances that threaten the capacity of healthcare systems to attain their objectives. This has directed attention towards the prospect of developing healthcare systems that are more responsive to the needs and expectations of the population by providing health planners with a systematic method to effectively manage human resources in this sector. This review analyses various approaches to health workforce planning and presents the Six-Step Methodology to Integrated Workforce Planning which highlights essential elements in workforce planning to ensure the quality of services. The purpose, scope and ownership of the approach is defined. Furthermore, developing an action plan for managing a health workforce is emphasised and a reviewing and monitoring process to guide corrective actions is suggested. PMID:25685381

  7. SU-G-TeP4-06: An Integrated Application for Radiation Therapy Treatment Plan Directives, Management, and Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matuszak, M; Anderson, C; Lee, C

    Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less

  8. Optimization of multi-objective integrated process planning and scheduling problem using a priority based optimization algorithm

    NASA Astrophysics Data System (ADS)

    Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu

    2015-12-01

    For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.

  9. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  10. 49 CFR 244.17 - Procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...

  11. 49 CFR 244.17 - Procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...

  12. 49 CFR 244.17 - Procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.17 Procedures. (a) Each applicant shall file one original of a proposed Safety Integration Plan with the Associate Administrator for Safety, FRA, 1200 New...

  13. Straighttalk. The ideal master facility plan begins with business strategy and integrates operational improvement.

    PubMed

    Powder, Scott; Brown, Richard E; Haupert, John M; Smith, Ryder

    2007-04-02

    Given the scarcity of capital to meet ever-growing demands for healthcare services, master facility planning has become more important than ever. Executives must align their master facility plans with their overall business strategy, incorporating the best in care- and service-delivery models. In this installment of Straight Talk, executives from two health systems--Advocate Health Care in Oak Brook, Ill. and Parkland Health & Hospital System in Dallas--discuss master facility planning. Modern Healthcare and PricewaterhouseCoopers present Straight Talk. The session on master facility planning was held on March 8, 2007 at Modern Healthcare's Chicago Headquarters. Charles Lauer, former vice president of publishing and editorial director at Modern Healthcare, was the moderator.

  14. Aiding planning in air traffic control: an experimental investigation of the effects of perceptual information integration.

    PubMed

    Moertl, Peter M; Canning, John M; Gronlund, Scott D; Dougherty, Michael R P; Johansson, Joakim; Mills, Scott H

    2002-01-01

    Prior research examined how controllers plan in their traditional environment and identified various information uncertainties as detriments to planning. A planning aid was designed to reduce this uncertainty by perceptually representing important constraints. This included integrating spatial information on the radar screen with discrete information (planned sequences of air traffic). Previous research reported improved planning performance and decreased workload in the planning aid condition. The purpose of this paper was to determine the source of these performance improvements. Analysis of computer interactions using log-linear modeling showed that the planning interface led to less repetitive--but more integrated--information retrieval compared with the traditional planning environment. Ecological interface design principles helped explain how the integrated information retrieval gave rise to the performance improvements. Actual or potential applications of this research include the design and evaluation of interface automation that keeps users in active control by modification of perceptual task characteristics.

  15. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  16. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and...

  17. Orion Integrated Guidance, Navigation, and Control [GN and C

    NASA Technical Reports Server (NTRS)

    Chevray, Kay

    2009-01-01

    This slide presentation reviews the integrated Guidance, Navigation and Control (iGN&C) system in the design for the Orion spacecraft. Included in the review are the plans for the design and development of the external interfaces, the functional architecture, the iGN&C software, the development and validation process, and the key challenges that are involved in the development of the iGN&C system

  18. IOLS '98. Proceedings of the National Conference on Integrated Online Library Systems (13th, New York, New York, May 13-14, 1998).

    ERIC Educational Resources Information Center

    Cibbarelli, Pamela R., Comp.; Nixon, Carol, Comp.

    Integrated Online Library Systems (IOLS) focuses exclusively on the issues of planning and managing automated systems in libraries and information centers. The theme of the IOLS '98 annual meeting is "Embrace and Extend," and 18 papers were selected for presentation that provide insight into the current technologies being "embraced" in libraries.…

  19. NASA/BLM Applications Pilot Test (APT), phase 2. Volume 3: Technology transfer

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Techniques used and materials presented at a planning session and two workshops held to provide hands-on training in the integration of quantitatively based remote sensing data are described as well as methods used to enhance understanding of approaches to inventories that integrate multiple data sources given various resource information objectives. Significant results from each of the technology transfer sessions are examined.

  20. A Belief-Space Approach to Integrated Intelligence - Research Area 10.3: Intelligent Networks

    DTIC Science & Technology

    2017-12-05

    A Belief-Space Approach to Integrated Intelligence- Research Area 10.3: Intelligent Networks The views , opinions and/or findings contained in this...high dimensionality and multi -modality of their hybrid configuration spaces. Planners that perform a purely geometric search are prohibitively slow...Hamburg, January Paper Title: Hierarchical planning for multi -contact non-prehensile manipulation Publication Type: Conference Paper or Presentation

  1. A knowledge-based approach to improving optimization techniques in system planning

    NASA Technical Reports Server (NTRS)

    Momoh, J. A.; Zhang, Z. Z.

    1990-01-01

    A knowledge-based (KB) approach to improve mathematical programming techniques used in the system planning environment is presented. The KB system assists in selecting appropriate optimization algorithms, objective functions, constraints and parameters. The scheme is implemented by integrating symbolic computation of rules derived from operator and planner's experience and is used for generalized optimization packages. The KB optimization software package is capable of improving the overall planning process which includes correction of given violations. The method was demonstrated on a large scale power system discussed in the paper.

  2. Austin ISD. Integrated Lesson Plans.

    ERIC Educational Resources Information Center

    East Texas State Univ., Commerce. Educational Development and Training Center.

    This packet contains 14 lesson plans for integrated academic and vocational education courses. Lesson plans for the following courses are included: integrated physics and principles of technology; algebra and principles of technology; principles of technology, language arts, and economics; physics and industrial electronics; physics and…

  3. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SCHULTZ, E.A.

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  4. Creating a Regional Drought Early Warning System (DEWS) for California and Nevada: Building Off of Information Gathered and Lessons Learned after 5 Years of Drought

    NASA Astrophysics Data System (ADS)

    Sheffield, A. M.; Marrs, A.; Wall, T. U.; Cayan, D.; Kalansky, J.; Redmond, K. T.; Huntington, J. L.; McEvoy, D.

    2016-12-01

    In California and Nevada, a diverse set of sectors and regional variation amidst a 5-year spell of drought presents multiple needs, gaps and challenges in providing usable available information for drought preparedness. In response to the findings of Governor Sandoval's Nevada Drought Forum and a series of stakeholder meetings and drought and climate outlooks in California, NOAA's National Integrated Drought Information System (NIDIS) has created the California-Nevada DEWS to leverage the activities of the existing California DEWS to better reflect the needs of the region after five years of unprecedented drought. In addition to presenting timely drought status and outlooks, these stakeholder-oriented meetings and listening sessions explored local drought impacts and drought informational needs. The information gathered will be integrated into a strategic plan for California-Nevada DEWS. This strategic plan will provide a roadmap of planned research and activities to enhance the ability of stakeholders in the region to better plan, prepare for and mitigate the impacts of drought. The implementation will involve key partners from a diverse network of federal, regional, tribal, state and local agencies and interests and will result in regionally specific deliverables to advance the California-Nevada DEWS.

  5. "We are all in this together": integrated health service plans in Ontario.

    PubMed

    Eliasoph, Hy; Monaghan, Barry; Beaudoin, Rémy; Cushman, Robert; DuBois-Wing, Gwen; Emery, Marilyn J; Fenn, W Michael; Hanmer, Sandra J; Huras, Paul; Lowi-Young, Mimi; Mandy, Pat; Trimnell, Jean; Switzer, Garry; Woolgar, Tony; Butler, John

    2007-01-01

    Ontario's 14 Local Health Integration Networks (LHINs) produced their first major deliverable when they issued their integrated health service plans in October 2006. This article reviews the experience of LHINs in meeting this challenge, outlines the process and outcome dimensions of the plans and discusses eight opportunities for LHINs as they act on the basis of their plans.

  6. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less

  7. Regional Traffic Incident Management Programs : Implementation Guide

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects ...

  8. Traffic conflict techniques for safety and operations : observers manual

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Institutional and Organizational Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. T...

  9. Metropolitan Transit Research Study

    DOT National Transportation Integrated Search

    1956-12-14

    Presents an historical and current overview of public transit in Chicago and discusses the steps to be taken to integrate the planning and financing of a regional transportation system for Chicago. Details the economic impact of parking and traffic c...

  10. Guidelines for testing and release procedures

    NASA Technical Reports Server (NTRS)

    Molari, R.; Conway, M.

    1984-01-01

    Guidelines and procedures are recommended for the testing and release of the types of computer software efforts commonly performed at NASA/Ames Research Center. All recommendations are based on the premise that testing and release activities must be specifically selected for the environment, size, and purpose of each individual software project. Guidelines are presented for building a Test Plan and using formal Test Plan and Test Care Inspections on it. Frequent references are made to NASA/Ames Guidelines for Software Inspections. Guidelines are presented for selecting an Overall Test Approach and for each of the four main phases of testing: (1) Unit Testing of Components, (2) Integration Testing of Components, (3) System Integration Testing, and (4) Acceptance Testing. Tools used for testing are listed, including those available from operating systems used at Ames, specialized tools which can be developed, unit test drivers, stub module generators, and the use of format test reporting schemes.

  11. Building capacity in local government for integrated planning to increase physical activity: evaluation of the VicHealth MetroACTIVE program.

    PubMed

    Thomas, M M; Hodge, W; Smith, B J

    2009-12-01

    Integrated planning is a holistic approach to addressing the needs of local communities built on partnerships between those responsible for development, environmental quality and service provision. This study investigated the extent and key influences on the use of integrated planning to promote physical activity among six metropolitan councils in Melbourne Australia, which took part in the MetroACTIVE Project funded by the Victorian Health Promotion Foundation from 2005 to 2007. The evaluation entailed interviews conducted at the mid-term (N = 67) and completion (N = 50) of the project, and the review of relevant documents. Respondents included elected councillors, chief executive officers, officers from different council divisions and the project staff employed in each council. Three councils showed evidence of integrated planning for physical activity, whereas the remainder focused on the delivery of community participation programs. Leadership from senior management and an organizational culture that supported collaboration across council departments were prerequisites for integrated planning. Employment of a dedicated project officer with skills for engaging management and building partnerships within the organization was important. Barriers to integrated planning were a complex organization structure, high demands on the council due to a growing residential population and a poor climate among staff. Overall, integrated planning was found to be a viable approach for developing a coordinated approach to this issue involving the range of council services and functions. Ongoing strategies are needed to facilitate senior management commitment and organizational capacity for integrated planning, with leadership provided by departments responsible for infrastructure or corporate planning.

  12. Sandia National Laboratories Institutional Plan FY1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    This report presents a five year plan for the laboratory. This plan takes advantage of the technical strengths of the lab and its staff to address issues of concern to the nation on a scope much broader than Sandia`s original mission, while maintaining the general integrity of the laboratory. The plan proposes initiatives in a number of technologies which overlap the needs of its customers and the strengths of its staff. They include: advanced manufacturing technology; electronics; information and computational technology; transportation energy technology and infrastructure; environmental technology; energy research and technology development; biomedical systems engineering; and post-cold war defensemore » imperatives.« less

  13. Status, Plans and Initial Results for Ares I Crew Launch Vehicle Aerodynamics

    NASA Technical Reports Server (NTRS)

    Huebner, Lawrence D.; Hall, Robert M.; Haynes, Davy A.; Pamadi, Bandu N.; Taylor, Terry L.; Seaford, C. Mark

    2008-01-01

    Following the completion of NASA s Exploration Systems Architecture Study in August 2004 for the NASA Exploration Systems Mission Directorate (ESMD), the Ares Projects Office at the NASA Marshall Space Flight Center was assigned project management responsibilities for the design and development of the first vehicle in the architecture, the Ares I Crew Launch Vehicle (CLV), which will be used to launch astronauts to low earth orbit and rendezvous with either the International Space Station or the ESMD s earth departure stage for lunar or other future missions beyond low Earth orbit. The primary elements of the Ares I CLV project are the first stage, the upper stage, the upper stage engine, and vehicle integration. Within vehicle integration is an effort in integrated design and analysis which is comprised of a number of technical disciplines needed to support vehicle design and development. One of the important disciplines throughout the life of the project is aerodynamics. This paper will present the status, plans, and initial results of Ares I CLV aerodynamics as the project was preparing for the Ares I CLV Systems Requirements Review. Following a discussion of the specific interactions with other technical panels and a status of the current activities, the plans for aerodynamic support of the Ares I CLV until the initial crewed flights will be presented. Keywords: Ares I Crew Launch Vehicle, aerodynamics, wind tunnel testing, computational fluid dynamics

  14. Multimodality Tumor Delineation and Predictive Modelling via Fuzzy-Fusion Deformable Models and Biological Potential Functions

    NASA Astrophysics Data System (ADS)

    Wasserman, Richard Marc

    The radiation therapy treatment planning (RTTP) process may be subdivided into three planning stages: gross tumor delineation, clinical target delineation, and modality dependent target definition. The research presented will focus on the first two planning tasks. A gross tumor target delineation methodology is proposed which focuses on the integration of MRI, CT, and PET imaging data towards the generation of a mathematically optimal tumor boundary. The solution to this problem is formulated within a framework integrating concepts from the fields of deformable modelling, region growing, fuzzy logic, and data fusion. The resulting fuzzy fusion algorithm can integrate both edge and region information from multiple medical modalities to delineate optimal regions of pathological tissue content. The subclinical boundaries of an infiltrating neoplasm cannot be determined explicitly via traditional imaging methods and are often defined to extend a fixed distance from the gross tumor boundary. In order to improve the clinical target definition process an estimation technique is proposed via which tumor growth may be modelled and subclinical growth predicted. An in vivo, macroscopic primary brain tumor growth model is presented, which may be fit to each patient undergoing treatment, allowing for the prediction of future growth and consequently the ability to estimate subclinical local invasion. Additionally, the patient specific in vivo tumor model will be of significant utility in multiple diagnostic clinical applications.

  15. Integrated Sociology Program Assessment: Inclusion of a Senior Portfolio Graduation Requirement

    ERIC Educational Resources Information Center

    Crockett, Jason L.; Fu, Albert S.; Greenwood, Joleen L.; John, Mauricia A.

    2018-01-01

    This article presents information about the planning, implementation, and findings of an assessment-based student portfolio designed by the faculty of a sociology program at Kutztown University of Pennsylvania, a midsized public regional liberal arts institution. First, we briefly present the rationale for implementing a portfolio system and the…

  16. Task-level robot programming: Integral part of evolution from teleoperation to autonomy

    NASA Technical Reports Server (NTRS)

    Reynolds, James C.

    1987-01-01

    An explanation is presented of task-level robot programming and of how it differs from the usual interpretation of task planning for robotics. Most importantly, it is argued that the physical and mathematical basis of task-level robot programming provides inherently greater reliability than efforts to apply better known concepts from artificial intelligence (AI) to autonomous robotics. Finally, an architecture is presented that allows the integration of task-level robot programming within an evolutionary, redundant, and multi-modal framework that spans teleoperation to autonomy.

  17. Multi-Element Integrated Project Planning at Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Mullon, Robert

    2008-01-01

    This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

  18. SIM Lite: Ground Alignment of the Instrument

    NASA Technical Reports Server (NTRS)

    Dekens, Frank G.; Goullioud, Renaud; Nicaise, Fabien; Kuan, Gary; Morales, Mauricio

    2010-01-01

    We present the start of the ground alignment plan for the SIM Lite Instrument. We outline the integration and alignment of the individual benches on which all the optics are mounted, and then the alignment of the benches to form the Science and Guide interferometers. The Instrument has a guide interferometer with only a 40 arc-seconds field of regard, and 200 arc-seconds of alignment adjustability. This requires each sides of the interferometer to be aligned to a fraction of that, while at the same time be orthogonal to the baseline defined by the External Metrology Truss. The baselines of the Science and Guide interferometers must also be aligned to be parallel. The start of these alignment plans is captured in a SysML Instrument System model, in the form of activity diagrams. These activity diagrams are then related to the hardware design and requirements. We finish with future plans for the alignment and integration activities and requirements.

  19. SIM Lite: ground alignment of the instrument

    NASA Astrophysics Data System (ADS)

    Dekens, Frank G.; Goullioud, Renaud; Nicaise, Fabien; Kuan, Gary; Morales, Mauricio

    2010-07-01

    We present the start of the ground alignment plan for the SIM Lite Instrument. We outline the integration and alignment of the individual benches on which all the optics are mounted, and then the alignment of the benches to form the Science and Guide interferometers. The Instrument has a guide interferometer with only a 40 arc-seconds field of regard, and 200 arc-seconds of alignment adjustability. This requires each sides of the interferometer to be aligned to a fraction of that, while at the same time be orthogonal to the baseline defined by the External Metrology Truss. The baselines of the Science and Guide interferometers must also be aligned to be parallel. The start of these alignment plans is captured in a SysML Instrument System model, in the form of activity diagrams. These activity diagrams are then related to the hardware design and requirements. We finish with future plans for the alignment and integration activities and requirements.

  20. A novel personal health system with integrated decision support and guidance for the management of chronic liver disease.

    PubMed

    Kiefer, Stephan; Schäfer, Michael; Bransch, Marco; Brimmers, Peter; Bartolomé, Diego; Baños, Janie; Orr, James; Jones, Dave; Jara, Maximilian; Stockmann, Martin

    2014-01-01

    A personal health system platform for the management of patients with chronic liver disease that incorporates a novel approach to integrate decision support and guidance through care pathways for patients and their doctors is presented in this paper. The personal health system incorporates an integrated decision support engine that guides patients and doctors through the management of the disease by issuing tasks and providing recommendations to both the care team and the patient and by controlling the execution of a Care Flow Plan based on the results of tasks and the monitored health status of the patient. This Care Flow Plan represents a formal, business process based model of disease management designed off-line by domain experts on the basis of clinical guidelines, knowledge of care pathways and an organisational model for integrated, patient-centred care. In this way, remote monitoring and treatment are dynamically adapted to the patient's actual condition and clinical symptoms and allow flexible delivery of care with close integration of specialists, therapists and care-givers.

  1. Planning for the integration of the digital library, clinical decision support, and evidence at the point of care.

    PubMed

    Schwartz, Linda Matula; Iobst, Barbara

    2008-01-01

    Integrating knowledge-based resources at the point of care is an important opportunity for hospital library involvement. In the progression of an IAIMS planning grant, the digital library is recognized as pivotal to the success of information domain integration throughout the institution. The planning process, data collection, and evolution of the planning project are discussed.

  2. Integrated technique of planning the capital repair of residential buildings and objects of transport infrastructure

    NASA Astrophysics Data System (ADS)

    Dement'eva, Marina

    2017-10-01

    The paper presents the results of a comparative analysis of two fundamentally different methods for planning capital repairs of objects of transport infrastructure and residential development. The first method was based on perspective long-term plans. Normative service life were the basis for planning the periodicity of repairs. The second method was based on the performance of repairs in fact of the onset of the malfunction. Problems of financing repair work, of the uneven aging of constructs and engineering systems, different wear mechanism in different conditions of exploitation, absence of methods of planning repairs of administrative and production buildings (depots, stations, etc.) justify the need to optimize methods of planning the repair and the relevance of this paper. The aim of the study was to develop the main provisions of an integrated technique for planning the capital repair of buildings of any functional purpose, which combines the advantages of each of the discussed planning methods. For this purpose, the consequences of technical and economic risk were analyzed of the buildings, including stations, depots, transport transfer hubs, administrative buildings, etc when choosing different planning methods. One of the significant results of the study is the possibility of justifying the optimal period of capital repairs on the basis of the proposed technical and economic criteria. The adjustment of the planned repair schedule is carried out taking into account the reliability and cost-effectiveness of the exploitation process.

  3. Adapting the Quebecois method for assessing implementation to the French National Alzheimer Plan 2008–2012: lessons for gerontological services integration

    PubMed Central

    Somme, Dominique; Trouvé, Hélène; Perisset, Catherine; Corvol, Aline; Ankri, Joël; Saint-Jean, Olivier; de Stampa, Matthieu

    2014-01-01

    Introduction Many countries face ageing-related demographic and epidemiological challenges, notably neurodegenerative disorders, due to the multiple care services they require, thereby pleading for a more integrated system of care. The integrated Quebecois method issued from the Programme of Research to Integrate Services for the Maintenance of Autonomy inspired a French pilot experiment and the National Alzheimer Plan 2008–2012. Programme of Research to Integrate Services for the Maintenance of Autonomy method implementation was rated with an evaluation grid adapted to assess its successive degrees of completion. Discussion The approaching end of the president's term led to the method's institutionalization (2011–2012), before the implementation study ended. When the government changed, the study was interrupted. The results extracted from that ‘lost’ study (presented herein) have, nonetheless, ‘found’ some key lessons. Key lessons/conclusion It was possible to implement a Quebecois integrated-care method in France. We describe the lessons and pitfalls encountered in adapting this evaluation tool. This process is necessarily multidisciplinary and requires a test phase. A simple tool for quantitative assessment of integration was obtained. The first assessment of the tool was unsatisfactory but requires further studies. In the meantime, we recommend using mixed methodologies to assess the services integration level. PMID:24959112

  4. Flight Systems Integration and Test

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    2011-01-01

    Topics to be Covered in this presentation are: (1) Integration and Test (I&T) Planning (2) Integration and Test Flows (3) Overview of Typical Mission I&T (4) Supporting Elements (5) Lessons-Learned and Helpful Hints (6) I&T Mishaps and Failures (7) The Lighter Side of I&T and (8) Small-Group Activity. This presentation highlights a typical NASA "in-house" I&T program (1) For flight systems that are developed by NASA at a space flight center (like GSFC) (2) Requirements well-defined: qualification/acceptance, documentation, configuration management. (3) Factors: precedents, human flight, risk-aversion ("failure-phobia"), taxpayer dollars, jobs and (4) Some differences among NASA centers, but generally a resource-intensive process

  5. Dynamic Data Management Based on Archival Process Integration at the Centre for Environmental Data Archival

    NASA Astrophysics Data System (ADS)

    Conway, Esther; Waterfall, Alison; Pepler, Sam; Newey, Charles

    2015-04-01

    In this paper we decribe a business process modelling approach to the integration of exisiting archival activities. We provide a high level overview of existing practice and discuss how procedures can be extended and supported through the description of preservation state. The aim of which is to faciliate the dynamic controlled management of scientific data through its lifecycle. The main types of archival processes considered are: • Management processes that govern the operation of an archive. These management processes include archival governance (preservation state management, selection of archival candidates and strategic management) . • Operational processes that constitute the core activities of the archive which maintain the value of research assets. These operational processes are the acquisition, ingestion, deletion, generation of metadata and preservation actvities, • Supporting processes, which include planning, risk analysis and monitoring of the community/preservation environment. We then proceed by describing the feasability testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospherics Data Centre and National Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2PB of data and 137 million individual files which were analysed and characterised in terms of format based risk. We are then able to present an overview of the risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets. We conclude by presenting a dynamic data management information model that is capable of describing the preservation state of archival holdings throughout the data lifecycle. We provide discussion of the following core model entities and their relationships: • Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. • Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks • Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans • The Result entities describe the successful outcomes of the executed plans. These include Acquisitions, Mitigations and Accepted Risks.

  6. Wilmington Area Planning Council, New Castle County, Delaware and Cecil County, Maryland : a performance-based approach to integrating congestion management into the metropolitan planning process

    DOT National Transportation Integrated Search

    2009-04-01

    The Wilmington Area Planning Council takes an objectives-driven, performance-based approach to its metropolitan transportation planning, including paying special attention to integrating its Congestion Management Process into its planning efforts. Th...

  7. Developing a Collegial Approach to Integrated Planning at a Small College: Communication, Understanding, and Cooperation.

    ERIC Educational Resources Information Center

    Farmer, D. W.

    1983-01-01

    An effective collegial and relatively noncompetitive approach to integrated planning developed at King's College is discussed. The development of a structured system of intensive oral communication; an organizational design integrating planning, budgeting, marketing, and evaluation, and a modified matrix management system are described. (MLW)

  8. Design for an integrated discipline operations control center for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Haines, Richard F.

    1993-01-01

    This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.

  9. Development of the North American cargo securement standard

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Benefit-Cost Analysis (BCA) for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pr...

  10. The EPOS implementation of thematic services for solid Earth sciences

    NASA Astrophysics Data System (ADS)

    Cocco, Massimo; Consortium, Epos

    2014-05-01

    The mission of EPOS is to build an efficient and comprehensive multidisciplinary research platform for the solid Earth sciences in Europe. In particular, EPOS is a long-term plan to facilitate integrated use of data, models and facilities from mainly distributed existing, but also new, research infrastructures for Earth Science. EPOS will enable innovative multidisciplinary research for a better understanding of the physical processes controlling earthquakes, volcanic eruptions, unrest episodes, ground stability, and tsunamis as well as those processes driving tectonics and Earth surface dynamics. EPOS will allow the Earth Science community to make a significant step forward by developing new concepts and tools for accurate, durable, and sustainable answers to societal questions concerning geo-hazards and those geodynamic phenomena relevant to the environment and human welfare. EPOS coordinates the existing and new solid Earth RIs within Europe and is building the integrating RI elements. This integration requires a significant coordination between, among others, disciplinary (thematic) communities, national RIs policies and initiatives, as well as geo- and IT-scientists. The RIs that EPOS coordinates include: i) Regionally-distributed geophysical observing systems (seismological and geodetic networks); ii) Local observatories (including geomagnetic, near-fault and volcano observatories); iii) Analytical and experimental laboratories; iv) Integrated satellite data and geological information services. We present the results achieved during the EPOS Preparatory Phase (which will end on October 2014) and the progress towards construction in terms of both the design of the integrated core services (ICS) and the development of thematic core services (TCS) for the different communities participating to the integration plan. We will focus on discussing the strategies adopted to foster the necessary implementation of TCS, clarifying their crucial role as domain-specific service hubs for coordinating and harmonizing national resources/plans with the European dimension of EPOS. We will present the prototype of the ICS central hub as a key contribution for providing multidisciplinary services for solid Earth sciences as well as the glue to keep ICT aspects integrated and rationalized across EPOS. Finally we will present the well-defined role of the EPOS-ERIC Head-Quarter to coordinate and harmonize national RIs and EPOS services (through ICS and TCS) with a clear commitment by national governments. This will be an important opportunity to discuss the EPOS multidisciplinary platform for discoveries to foster scientific excellence in solid Earth research.

  11. Report on phase 1 of the Microprocessor Seminar. [and associated large scale integration

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Proceedings of a seminar on microprocessors and associated large scale integrated (LSI) circuits are presented. The potential for commonality of device requirements, candidate processes and mechanisms for qualifying candidate LSI technologies for high reliability applications, and specifications for testing and testability were among the topics discussed. Various programs and tentative plans of the participating organizations in the development of high reliability LSI circuits are given.

  12. Improving the integration of recreation management with management of other natural resources by applying concepts of scale from ecology

    Treesearch

    Wayde c. Morse; Troy E. Hall; Linda E. Kruger

    2008-01-01

    In this article, we examine how issues of scale affect the integration of recreation management with the management of other natural resources on public lands. We present two theories used to address scale issues in ecology and explore how they can improve the two most widely applied recreation-planning frameworks. The theory of patch dynamics and hierarchy theory are...

  13. ATD-1 Operational Integration Assessment Final Report

    NASA Technical Reports Server (NTRS)

    Witzberger, Kevin E.; Sharma, Shivanjli; Martin, Lynn Hazel; Wynnyk, Mitch; McGarry, Katie

    2015-01-01

    The FAA and NASA conducted an Operational Integration Assessment (OIA) of a prototype Terminal Sequencing and Spacing (formerly TSS, now TSAS) system at the FAA's William J. Hughes Technical Center (WJHTC). The OIA took approximately one year to plan and execute, culminating in a formal data collection, referred to as the Run for Record, from May 12-21, 2015. This report presents quantitative and qualitative results from the Run for Record.

  14. Assess 2: Spacelab simulation. Executive summary

    NASA Technical Reports Server (NTRS)

    1977-01-01

    An Airborne Science/Spacelab Experiments System Simulation (ASSESS II) mission, was conducted with the CV-990 airborne laboratory in May 1977. The project studied the full range of Spacelab-type activities including management interactions, experiment selection and funding, hardware development, payload integration and checkout, mission specialist and payload specialist selection and training, mission control center payload operations control center arrangements and interactions, real time interaction during flight between principal investigators and the flight crew, and retrieval of scientific flight data. ESA established an integration and coordination center for the ESA portion of the payload as planned for Spacelab. A strongly realistic Spacelab mission was conducted on the CV-990 aircraft. U.S. and ESA scientific experiments were integrated into a payload and flown over a 10 day period, with the payload flight crew fully-confined to represent a Spacelab mission. Specific conclusions for Spacelab planning are presented along with a brief explanation of each.

  15. FootFall: A Ground Based Operations Toolset Enabling Walking for the ATHLETE Rover

    NASA Technical Reports Server (NTRS)

    SunSpiral, Vytas; Chavez-Clemente, Daniel; Broxton, Michael; Keely, Leslie; Mihelich, Patrick; Mittman, David; Collins, Curtis

    2008-01-01

    The ATHLETE (All-Terrain Hex-Limbed Extra-Terrestrial Explorer) vehicle consists of six identical, six degree of freedom limbs. FootFall is a ground tool for ATHLETE intended to provide an operator with integrated situational awareness, terrain reconstruction, stability and safety analysis, motion planning, and decision support capabilities to enable the efficient generation of flight software command sequences for walking. FootFall has been under development at NASA Ames for the last year, and having accomplished the initial integration, it is being used to generate command sequences for single footfalls. In this paper, the architecture of FootFall in its current state will be presented, results from the recent Human Robotic Systems Project?s Integrated Field Test (Moses Lake, Washington, June, 2008) will be discussed, and future plans for extending the capabilities of FootFall to enable ATHLETE to walk across a boulder field in real time will be described.

  16. SARDA: An Integrated Concept for Airport Surface Operations Management

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Hoang, Ty; Jung, Yoon Chul

    2013-01-01

    The Spot and Runway Departure Advisor (SARDA) is an integrated decision support tool for airlines and air traffic control tower enabling surface collaborative decision making (CDM) and departure metering in order to enhance efficiency of surface operations at congested airports. The presentation describes the concept and architecture of the SARDA as a CDM tool, and the results from a human-in-the-loop simulation of the tool conducted in 2012 at the FutureFlight Central, the tower simulation facility. Also, presented is the current activities and future plan for SARDA development. The presentation was given at the meeting with the FAA senior advisor of the Surface Operations Office.

  17. Demand-Side Management and Integrated Resource Planning: Findings from a Survey of 24 Electric Utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schweitzer, M.

    1991-01-01

    Integrated resource planning differs from traditional utility planning practices primarily in its increased attention to demand-side management (DSM) programs and its integration of supply- and demand-side resources into a combined resource portfolio. This report details the findings from an Oak Ridge National Laboratory (ORNL) survey of 24 electric utilities that have well-developed integrated planning processes. These utilities account for roughly one-third of total capacity, electricity generation, and DSM-program expenditures nationwide. The ORNL survey was designed to obtain descriptive data on a national sample of utilities and to test a number of hypothesized relationships between selected utility characteristics and the mixmore » of resources selected for the integrated plan, with an emphasis on the use of DSM resources and the processes by which they are chosen. The survey solicited information on each utility's current and projected resource mix, operating environment, procedures used to screen potential DSM resources, techniques used to obtain public input and to integrate supply- and demand-side options into a unified plan, and procedures used in the final selection of resources for the plan.« less

  18. Plan for the design, development, and implementation, and operation of the National Water Information System

    USGS Publications Warehouse

    Edwards, M.D.

    1987-01-01

    The Water Resources Division of the U.S. Geological Survey is developing a National Water Information System (NWIS) that will integrate and replace its existing water data and information systems of the National Water Data Storage and Retrieval System, National Water Data Exchange, National Water-Use Information, and Water Resources Scientific Information Center programs. It will be a distributed data system operated as part of the Division 's Distributed Information System, which is a network of computers linked together through a national telecommunication network known as GEONET. The NWIS is being developed as a series of prototypes that will be integrated as they are completed to allow the development and implementation of the system in a phased manner. It also is being developed in a distributed manner using personnel who work under the coordination of a central NWIS Project Office. Work on the development of the NWIS began in 1983 and it is scheduled for completion in 1990. This document presents an overall plan for the design, development, implementation, and operation of the system. Detailed discussions are presented on each of these phases of the NWIS life cycle. The planning, quality assurance, and configuration management phases of the life cycle also are discussed. The plan is intended to be a working document for use by NWIS management and participants in its design and development and to assist offices of the Division in planning and preparing for installation and operation of the system. (Author 's abstract)

  19. Marine spatial planning in Cyprus

    NASA Astrophysics Data System (ADS)

    Hadjimitsis, Diofantos; Agapiou, Athos; Mettas, Christodoulos; Themistocleous, Kyriacos; Evagorou, Evagoras; Cuca, Branka; Papoutsa, Christiana; Nisantzi, Argyro; Mamouri, Rodanthi-Elisavet; Soulis, George; Xagoraris, Zafiris; Lysandrou, Vasiliki; Aliouris, Kyriacos; Ioannou, Nicolas; Pavlogeorgatos, Gerasimos

    2015-06-01

    Marine Spatial Planning (MSP), which is in concept similar to land-use planning, is a public process by which the relevant Member State's authorities analyse and organise human activities in marine areas to achieve ecological, economic and social objectives. MSP aims to promote sustainable growth of maritime economies, sustainable development of marine areas and sustainable use of marine resources. This paper highlights the importance of MSP and provides basic outcomes of the main European marine development. The already successful MSP plans can provide useful feedback and guidelines for other countries that are in the process of implementation of an integrated MSP, such as Cyprus. This paper presents part of the MSP project, of which 80% funded by the European Regional Development Fund (ERDF) and 20% from national contribution. An overview of the project is presented, including data acquisition, methodology and preliminary results for the implementation of MSP in Cyprus.

  20. 78 FR 77550 - Integrated Corridor Management Deployment Planning Grants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-23

    ... of this program is to promote the integrated management and operations of the transportation system... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Integrated Corridor Management... the Integrated Corridor Management Deployment Planning Grants. The purpose of this notice was to...

  1. IT strategic planning in hospitals: from theory to practice.

    PubMed

    Jaana, Mirou; Teitelbaum, Mari; Roffey, Tyson

    2014-07-01

    To date, IT strategic planning has been mostly theory-based with limited information on "best practices" in this area. This study presents the process and outcomes of IT strategic planning undertaken at a pediatric hospital (PH) in Canada. A five-stage sequential and incremental process was adopted. Various tools / approaches were used including review of existing documentation, internal survey (n = 111), fifteen interviews, and twelve workshops. IT strategic planning was informed by 230 individuals (12 percent of hospital community) and revealed consistency in the themes and concerns raised by participants (e.g., slow IT projects delivery rate, lack of understanding of IT priorities, strained communication with IT staff). Mobile and remote access to patients' information, and an integrated EMR were identified as top priorities. The methodology and used approach revealed effective, improved internal relationships, and ensured commitment to the final IT strategic plan. Several lessons were learned including: maintaining a dynamic approach capable of adapting to the fast technology evolution; involving stakeholders and ensuring continuous communication; using effective research tools to support strategic planning; and grounding the process and final product in existing models. This study contributes to the development of "best practices" in IT strategic planning, and illustrates "how" to apply the theoretical principles in this area. This is especially important as IT leaders are encouraged to integrate evidence-based management into their decision making and practices. The methodology and lessons learned may inform practitioners in other hospitals planning to engage in IT strategic planning in the future.

  2. 78 FR 2685 - Notice of Intent To Prepare a Programmatic Environmental Impact Statement (EIS) for the Navajo...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-14

    ... Environmental Impact Statement (EIS) for the Navajo Nation Integrated Weed Management Plan Within Coconino...-year integrated weed management plan for the Navajo Indian Reservation. The Navajo Indian Reservation... integrated weed management plan include, but will not be limited to, mechanical, cultural, biological and...

  3. Integrating strategic environmental assessment with industry planning: a case study of the Pasquai-Porcupine forest management plan, Saskatchewan, Canada.

    PubMed

    Noble, Bram F

    2004-03-01

    Strategic environmental assessment (SEA) is gaining widespread recognition as a tool for integrating environmental considerations in policy, plan, and program development and decision-making. Notwithstanding the potential of SEA to improve higher-order decision processes, there has been very little attention given to integrating SEA with industry planning practices. As a result, the benefits of SEA have yet to be fully realized among industrial proponents. That said, SEA practice is ongoing, albeit informally and often under a different label, and is proving to be a valuable tool for industry planning and decision-making. Based on a case study of the Pasquai-Porcupine forest management plan in Saskatchewan, Canada, this paper illustrates how an integrated approach to SEA can contribute to industry environmental decision-making and can enhance the quality and deliverability of industry plans.

  4. The requirements for implementing Sustainable Development Goals (SDGs) and for planning and implementing Integrated Territorial Investments (ITI) in mining areas

    NASA Astrophysics Data System (ADS)

    Florkowska, Lucyna; Bryt-Nitarska, Izabela

    2018-04-01

    The notion of Integrated Territorial Investments (ITI) appears more and more frequently in contemporary regional development strategies. Formulating the main assumptions of ITI is a response to a growing need for a co-ordinated, multi-dimensional regional development suitable for the characteristics of a given area. Activities are mainly aimed at improving people's quality of life with their significant participation. These activities include implementing the Sustainable development Goals (SDGs). Territorial investments include, among others, projects in areas where land and building use is governed not only by general regulations (Spatial Planning and Land Development Act) but also by separate legal acts. This issue also concerns areas with active mines and post-mining areas undergoing revitalization. For the areas specified above land development and in particular making building investments is subject to the requirements set forth in the Geological and Mining Law and in the general regulations. In practice this means that factors connected with the present and future mining impacts must be taken into consideration in planning the investment process. This article discusses the role of proper assessment of local geological conditions as well as the current and future mining situation in the context of proper planning and performance of the Integrated Territorial Investment programme and also in the context of implementing the SDGs. It also describes the technical and legislative factors which need to be taken into consideration in areas where mining is planned or where it took place in the past.

  5. Tentative Guidelines for the Development of an Ability-Based Emotional Intelligence Intervention Program for Gifted Students

    ERIC Educational Resources Information Center

    Zeidner, Moshe

    2017-01-01

    This paper presents a number of general principles and guidelines for the development of an emotional intelligence training program designed to foster emotional abilities in gifted students. The presented guidelines underscore the need for EI theory-driven program planning geared to the needs of gifted students; integrating activities into routine…

  6. Data systems and computer science programs: Overview

    NASA Technical Reports Server (NTRS)

    Smith, Paul H.; Hunter, Paul

    1991-01-01

    An external review of the Integrated Technology Plan for the Civil Space Program is presented. The topics are presented in viewgraph form and include the following: onboard memory and storage technology; advanced flight computers; special purpose flight processors; onboard networking and testbeds; information archive, access, and retrieval; visualization; neural networks; software engineering; and flight control and operations.

  7. Space Station Environment Control and Life Support System Pressure Control Pump Assembly Modeling and Analysis

    NASA Technical Reports Server (NTRS)

    Schunk, R. Gregory

    2002-01-01

    This paper presents the Modeling and Analysis of the Space Station Environment Control and Life Support System Pressure Control Pump Assembly (PCPA). The contents include: 1) Integrated PCPA/Manifold Analyses; 2) Manifold Performance Analysis; 3) PCPA Motor Heat Leak Study; and 4) Future Plans. This paper is presented in viewgraph form.

  8. 7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering

    NASA Technical Reports Server (NTRS)

    Housch, Helen; Godfrey, Sally

    2011-01-01

    The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.

  9. NASA/ESMD Analogue Mission Plans

    NASA Technical Reports Server (NTRS)

    Hoffman, Stephen J.

    2007-01-01

    A viewgraph presentation exploring Earth and its analogues is shown. The topics include: 1) ESMD Goals for the Use of Earth Analogues; 2) Stakeholders Summary; 3) Issues with Current Analogue Situation; 4) Current state of Analogues; 5) External Implementation Plan (Second Step); 6) Recent Progress in Utilizing Analogues; 7) Website Layout Example-Home Page; 8) Website Layout Example-Analogue Site; 9) Website Layout Example-Analogue Mission; 10) Objectives of ARDIG Analog Initiatives; 11) Future Plans; 12) Example: Cold-Trap Sample Return; 13) Example: Site Characterization Matrix; 14) Integrated Analogue Studies-Prerequisites for Human Exploration; and 15) Rating Scale Definitions.

  10. Continual planning and scheduling for managing patient tests in hospital laboratories.

    PubMed

    Marinagi, C C; Spyropoulos, C D; Papatheodorou, C; Kokkotos, S

    2000-10-01

    Hospital laboratories perform examination tests upon patients, in order to assist medical diagnosis or therapy progress. Planning and scheduling patient requests for examination tests is a complicated problem because it concerns both minimization of patient stay in hospital and maximization of laboratory resources utilization. In the present paper, we propose an integrated patient-wise planning and scheduling system which supports the dynamic and continual nature of the problem. The proposed combination of multiagent and blackboard architecture allows the dynamic creation of agents that share a set of knowledge sources and a knowledge base to service patient test requests.

  11. Patterns of service use in two types of managed behavioral health care plans.

    PubMed

    Merrick, Elizabeth L; Hodgkin, Dominic; Hiatt, Deirdre; Horgan, Constance M; Azzone, Vanessa; McCann, Bernard; Ritter, Grant; Zolotusky, Galima; McGuire, Thomas G; Reif, Sharon

    2010-01-01

    The study examined service use patterns by level of care in two managed care plans offered by a national managed behavioral health care organization (MBHO): an employee assistance program (EAP) combined with a standard behavioral health plan (integrated plan) and a standard behavioral health plan. The cross-sectional analysis used 2004 administrative data from the MBHO. Utilization of 11 specific service categories was compared. The weighted sample reflected exact matching on sociodemographic characteristics (unweighted N=710,014; weighted N=286,750). A larger proportion of enrollees in the integrated plan than in the standard plan used outpatient mental health and substance abuse office visits (including EAP visits) (p<.01) and substance abuse intensive outpatient or day treatment (p<.05), and the proportion using residential substance abuse rehabilitation was lower (p<.05). The integrated and standard products had distinct utilization patterns in this large MBHO. In particular, greater use of certain outpatient services was observed in the integrated plan.

  12. Strategies for flood hazard adaptation in drought affected regions of Afghanistan

    NASA Astrophysics Data System (ADS)

    Schleupner, Christine

    2010-05-01

    The development and management of water resources in Afghanistan are critically important for the economic development of the country. But Afghanistan presents a number of specific challenges in terms of water resource management and climate change impact assessment. Political instability and war has caused widespread devastation, insecurity, displacement, poverty and severe environmental degradation. Recent droughts have led to the collapse of many livelihoods, and poor national security restricts structured fieldwork. The recent restructuring and rebuilding of the state can be seen as opportunity to integrate climate change mitigation and adaptation measures into national, regional, and local planning. Governmental organizations are responsible to integrate climate change related issues and pro-active planning processes in water management and environmental considerations into relevant legislations, ministry and sector strategies. Integrated water resource management has been practically nonexistent during the last decades and consideration of climate change impacts are widely ignored in regional planning processes. However, flooding, landslides, drought, and extreme heat and freezing weather are already threatening the population. Climate models suggest that Afghanistan will be confronted by an increase of these events. Desertification and land degradation but also floods due to untimely rainfall are expected to broaden. Studies show that the impact of increasingly frequent flash floods may be amplified due to more rapid spring snow melt as a result of higher temperatures, combined with the downstream effects of land degradation, loss of vegetative cover and land mismanagement. It is further exacerbated by drought, which has the effect of hardening soils and reducing their permeability. In 2007 heavy floods already destroyed fields and harvests, killed livestock, damaged buildings, and claimed many lives. The intensified climatic conditions in Afghanistan will continue to impact upon society by creating stresses for specific vulnerable groups. This study discusses and compares existing policies, legislations and strategies considering flood adaptation planning in Afghanistan. It reviews available Flood Hazard Maps and reflects on regional adaptation options. Present and future vulnerability to flooding is assessed through a GIS-based model by using scenario techniques. A strategy is developed how to implement measures into regional and integrated water resource management planning. In general, not a single but the selection of multiple measures will be successful in pro-active planning for climate change adaptation. In this regard a continuous consultation with stakeholders needs to take place to address their demands. Thus the results of this study cannot give solutions but might build the basis for recommended active planning processes.

  13. Probabilistic Solar Energetic Particle Models

    NASA Technical Reports Server (NTRS)

    Adams, James H., Jr.; Dietrich, William F.; Xapsos, Michael A.

    2011-01-01

    To plan and design safe and reliable space missions, it is necessary to take into account the effects of the space radiation environment. This is done by setting the goal of achieving safety and reliability with some desired level of confidence. To achieve this goal, a worst-case space radiation environment at the required confidence level must be obtained. Planning and designing then proceeds, taking into account the effects of this worst-case environment. The result will be a mission that is reliable against the effects of the space radiation environment at the desired confidence level. In this paper we will describe progress toward developing a model that provides worst-case space radiation environments at user-specified confidence levels. We will present a model for worst-case event-integrated solar proton environments that provide the worst-case differential proton spectrum. This model is based on data from IMP-8 and GOES spacecraft that provide a data base extending from 1974 to the present. We will discuss extending this work to create worst-case models for peak flux and mission-integrated fluence for protons. We will also describe plans for similar models for helium and heavier ions.

  14. Idaho National Laboratory Site Pollution Prevention Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E. D. Sellers

    2007-03-01

    It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less

  15. 18 CFR 740.4 - State water management planning program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) The integration of water quantity and water quality planning and management; (ii) The protection and... integration of ground and surface water planning and management; and (v) Water conservation. (4) Identify...

  16. Integrated assessment and consultation for the preoperative patient.

    PubMed

    Silverman, David G; Rosenbaum, Stanley H

    2009-12-01

    Assessment of the presurgical patient requires interdisciplinary cooperation over the continuum of documentation and optimization of existing disorders, determination of patient resilience and reserve, and planning for subsequent interventions and care. For many patients, evident or suspected morbidities or anticipated surgical disturbance warrant specialty consultation. There may be uncertainty as to the optimal processes for a given patient, a limitation attributable to myriad factors, not the least of which is that there is often a paucity of evidence that is directly relevant to a given patient in a given setting. The present article discusses these limitations and describes a framework for documentation, optimization, risk assessment, and planning, as well as a uniform grading of existing morbidities and anticipated perioperative disturbances for patients requiring integrated assessment and consultation.

  17. Integrated assessment and consultation for the preoperative patient.

    PubMed

    Silverman, David G; Rosenbaum, Stanley H

    2009-09-01

    Assessment of the presurgical patient requires interdisciplinary cooperation over the continuum of documentation and optimization of existing disorders, determination of patient resilience and reserve, and planning for subsequent interventions and care. For many patients, evident or suspected morbidities or anticipated surgical disturbance warrant specialty consultation. There may be uncertainty as to the optimal processes for a given patient, a limitation attributable to myriad factors, not the least of which is that there is often a paucity of evidence that is directly relevant to a given patient in a given setting. The present article discusses these limitations and describes a framework for documentation, optimization, risk assessment, and planning, as well as a uniform grading of existing morbidities and anticipated perioperative disturbances for patients requiring integrated assessment and consultation.

  18. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... implementation of integrated resource management plans which provide coordination for the comprehensive management of all natural resources on Indian land. If the integrated resource management planning process... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management...

  19. A Needs Analysis for Technology Integration Plan: Challenges and Needs of Teachers

    ERIC Educational Resources Information Center

    Vatanartiran, Sinem; Karadeniz, Sirin

    2015-01-01

    Lack of technology leadership and technology integration plans are important obstacles for using technology effectively in schools. We carried out a large-scale study to be able to design a technology integration plan for one of the pilot provinces that Fatih Project was initiated. The purpose of this research is to examine the perceived…

  20. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  1. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  2. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  3. 48 CFR 970.5223-1 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Integration of environment, safety, and health into work planning and execution. As prescribed in 970.2303-3(b), insert the following clause: Integration of Environment, Safety, and Health Into Work Planning and... danger to the environment or health and safety of employees or the public, the Contracting Officer may...

  4. 48 CFR 952.223-71 - Integration of environment, safety, and health into work planning and execution.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Integration of environment, safety, and health into work planning and execution. 952.223-71 Section 952.223-71 Federal Acquisition... Provisions and Clauses 952.223-71 Integration of environment, safety, and health into work planning and...

  5. Life sciences payload definition and integration study, task C and D. Volume 1: Management summary

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The findings of a study to define the required payloads for conducting life science experiments in space are presented. The primary objectives of the study are: (1) identify research functions to be performed aboard life sciences spacecraft laboratories and necessary equipment, (2) develop conceptual designs of potential payloads, (3) integrate selected laboratory designs with space shuttle configurations, and (4) establish cost analysis of preliminary program planning.

  6. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project

    NASA Technical Reports Server (NTRS)

    Griner, James H.

    2013-01-01

    NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication system prototype radio, operating on recently allocated UAS frequency spectrum bands. The prototype radio will be used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the design, development, and flight test planning for this prototype radio.

  7. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  8. Strategic plan modelling by hospital senior administration to integrate diversity management.

    PubMed

    Newhouse, John J

    2010-11-01

    Limited research suggests that some hospital senior administrators and chief executive officers (CEOs) have employed a strategic planning function to achieve diversity management practices. As the hospital industry struggles with how to integrate diversity practices to improve patient satisfaction, increase the quality of care and enhance clinical outcomes for minority populations, understanding the planning process involved in this endeavour becomes significant for senior hospital administrators. What is not well understood is what this strategic planning process represents and how it is applied to integrate diversity management. Scant research exists about the type of strategic models that hospital CEOs employ when they wish to reposition their organizations through diversity management. This study examines the strategic planning models used by senior administrators to integrate diversity management for an institutional-wide agenda. A qualitative survey process was used for CEOs in the states of New York, Pennsylvania, New Jersey and Delaware. The key research questions dealt with what type of strategic plan approach senior administrators used for integrating diversity management and what rationale they used to pursue this. Significant differences were reported between three types of strategic plan modelling used by CEOs. Also, when comparing past and current practices over time, such differences existed. The need to integrate diversity management is underscored by this study. How senior hospital administrators apply strategic plan models and what impact these approaches have represent the major implications that this study offers.

  9. Overcoming Barriers to Family Planning through Integration: Perspectives of HIV-Positive Men in Nyanza Province, Kenya

    PubMed Central

    Steinfeld, Rachel L.; Newmann, Sara J.; Onono, Maricianah; Cohen, Craig R.; Bukusi, Elizabeth A.; Grossman, Daniel

    2013-01-01

    This study explored barriers to and facilitators of using family planning services among HIV-positive men in Nyanza Province, Kenya. From May to June 2010, in-depth interviews were conducted with 30 men receiving care at 15 HIV clinics. The key barriers to the use of family planning included concerns about side effects of contraceptives, lack of knowledge about contraceptive methods, myths and misconceptions including fear of infertility, structural barriers such as staffing shortages at HIV clinics, and a lack of male focus in family planning methods and service delivery. The integration of family planning into HIV clinics including family planning counseling and education was cited as an important strategy to improve family planning receptivity among men. Integrating family planning into HIV services is a promising strategy to facilitate male involvement in family planning. Integration needs to be rigorously evaluated in order to measure its impact on unmet need for contraception among HIV-positive women and their partners and assure that it is implemented in a manner that engages both men and women. PMID:23738057

  10. Putting people on the map through an approach that integrates social data in conservation planning.

    PubMed

    Stephanson, Sheri L; Mascia, Michael B

    2014-10-01

    Conservation planning is integral to strategic and effective operations of conservation organizations. Drawing upon biological sciences, conservation planning has historically made limited use of social data. We offer an approach for integrating data on social well-being into conservation planning that captures and places into context the spatial patterns and trends in human needs and capacities. This hierarchical approach provides a nested framework for characterizing and mapping data on social well-being in 5 domains: economic well-being, health, political empowerment, education, and culture. These 5 domains each have multiple attributes; each attribute may be characterized by one or more indicators. Through existing or novel data that display spatial and temporal heterogeneity in social well-being, conservation scientists, planners, and decision makers may measure, benchmark, map, and integrate these data within conservation planning processes. Selecting indicators and integrating these data into conservation planning is an iterative, participatory process tailored to the local context and planning goals. Social well-being data complement biophysical and threat-oriented social data within conservation planning processes to inform decisions regarding where and how to conserve biodiversity, provide a structure for exploring socioecological relationships, and to foster adaptive management. Building upon existing conservation planning methods and insights from multiple disciplines, this approach to putting people on the map can readily merge with current planning practices to facilitate more rigorous decision making. © 2014 Society for Conservation Biology.

  11. Automated planning of tangential breast intensity-modulated radiotherapy using heuristic optimization.

    PubMed

    Purdie, Thomas G; Dinniwell, Robert E; Letourneau, Daniel; Hill, Christine; Sharpe, Michael B

    2011-10-01

    To present an automated technique for two-field tangential breast intensity-modulated radiotherapy (IMRT) treatment planning. A total of 158 planned patients with Stage 0, I, and II breast cancer treated using whole-breast IMRT were retrospectively replanned using automated treatment planning tools. The tools developed are integrated into the existing clinical treatment planning system (Pinnacle(3)) and are designed to perform the manual volume delineation, beam placement, and IMRT treatment planning steps carried out by the treatment planning radiation therapist. The automated algorithm, using only the radio-opaque markers placed at CT simulation as inputs, optimizes the tangential beam parameters to geometrically minimize the amount of lung and heart treated while covering the whole-breast volume. The IMRT parameters are optimized according to the automatically delineated whole-breast volume. The mean time to generate a complete treatment plan was 6 min, 50 s ± 1 min 12 s. For the automated plans, 157 of 158 plans (99%) were deemed clinically acceptable, and 138 of 158 plans (87%) were deemed clinically improved or equal to the corresponding clinical plan when reviewed in a randomized, double-blinded study by one experienced breast radiation oncologist. In addition, overall the automated plans were dosimetrically equivalent to the clinical plans when scored for target coverage and lung and heart doses. We have developed robust and efficient automated tools for fully inversed planned tangential breast IMRT planning that can be readily integrated into clinical practice. The tools produce clinically acceptable plans using only the common anatomic landmarks from the CT simulation process as an input. We anticipate the tools will improve patient access to high-quality IMRT treatment by simplifying the planning process and will reduce the effort and cost of incorporating more advanced planning into clinical practice. Crown Copyright © 2011. Published by Elsevier Inc. All rights reserved.

  12. Status of the JWST Integrated Science Instrument Module

    NASA Astrophysics Data System (ADS)

    Greenhouse, Matthew A.; Dunn, Jamie; Kimble, Randy A.; Lambros, Scott; Lundquist, Ray; Rauscher, Bernard J.; Van Campen, Julie

    2015-01-01

    The James Webb Space Telescope (JWST) Integrated Science Instrument Module (ISIM) is the science instrument payload of the JWST. It is one of three system elements that comprise the JWST space vehicle. It consists of four science sensors, a fine guidance sensor, and nine other subsystems that support them. At 1.4 metric tons, it comprises approximately 20% of the JWST mass. The ISIM is currently at 100% integration and has completed 2 of 3 planned element-level space simulation tests. The ISIM is on schedule to be delivered for integration with the Optical Telescope Element during 2015. In this poster, we present an overview of the ISIM and its status.

  13. Structural Integrity and Durability of Reusable Space Propulsion Systems

    NASA Technical Reports Server (NTRS)

    1991-01-01

    A two-day conference on the structural integrity and durability of reusable space propulsion systems was held on 14 to 15 May 1991 at the NASA Lewis Research Center. Presentations were made by industry, university, and government researchers organized into four sessions: (1) aerothermodynamic loads; (2) instrumentation; (3) fatigue, fracture, and constitutive modeling; and (4) structural dynamics. The principle objectives were to disseminate research results and future plans in each of four areas. This publication contains extended abstracts and the visual material presented during the conference. Particular emphasis is placed on the Space Shuttle Main Engine (SSME) and the SSME turbopump.

  14. Comparison of Satellite based Ion Density Measurements with Digisonde electron density measurements

    NASA Astrophysics Data System (ADS)

    Wilson, G.; Balthazor, R. L.; Reinisch, B. W.; McHarg, M.; Maldonado, C.

    2017-12-01

    The integrated Miniaturized Electrostatic Analyzer (IMESA) flying on the STPSat-3 satellite has collected more than 3 years of ion density data. This instrument is the first in a constellation of up to 6 instruments. We plan on integrating the data from all IMESAs into an approiate ionospheric model. OUr first step is to validate the IMESA data and calibrate the instrument. In this presentation we discuss our process for preparing IMESA data and comparing it to ground based measurements. Lastly, we present a number of comparisons between IMESA ion density measurements and digisonde electron density measurements.

  15. An Assessment of Institutional Capacity for Integrated Landscape Management in Eastern Cameroon.

    PubMed

    Brown, H Carolyn Peach

    2018-07-01

    Landscape approaches have become prominent in efforts to address issues of conservation and development through bringing together different actors and sectors, to reconcile diverse land uses, and promote synergies. Some have suggested that integrated landscape management approaches are consistent with the goals of REDD+ and offer a strategy to address multiple goals of climate change mitigation, biodiversity conservation, maintenance of ecosystem services, and socio-economic development. Institutional or governance arrangements have been shown to be a critical component in influencing outcomes in landscapes. Using diverse methodologies, this study investigated the capacity of institutions to support the planning, implementation, and resource mobilization needed to integrate climate change mitigation, conservation, and livelihood goals in a forest mosaic landscape in East Cameroon. Results showed that diverse institutions are present in the landscape, including institutions of relevant government agencies, local government, local non-government, the private sector, and hybrid institutions of conservation, development and research institutions. However, the overall institutional capacity for integrated landscape planning and management in the study area is limited, although some institutions exhibit increased capacity in some areas over others. Multiple strategies can be employed to build the necessary human, financial, and leadership capacity, and facilitate the institutional planning and coordination that is foundational to multi-stakeholder landscape governance. Given the complexity of integrating climate change mitigation, conservation and livelihood goals in a landscape, building such institutional capacity is a long term endeavour that requires sustained effort and ongoing financial, technical and human resource support.

  16. An instructional package integrating science and social studies instruction at the fifth-grade level

    NASA Astrophysics Data System (ADS)

    Hulley, Kathy Louise Sullivan

    Integrative education is being implemented by classroom teachers who want to immerse students in an environment rich in problem-solving skills, critical analysis skills, ethics, valuing of knowledge, and communication of learning. Several subject areas in the curriculum have been integrated, such as literature with social studies and mathematics with science. The focus of this dissertation is on the integration of science and social studies at the fifth grade level using the Mississippi State Department of Education Curriculum Guidelines and Objectives (MSDE, 1995) and the National Science Education Standards (National Research Council (NRC), 1996). An instructional package of lesson plans that teachers can use as ideas to create their own plans for an integrated curriculum of science and social studies was devised. The Mississippi State Department of Education Curriculum Guidelines and Objectives for Social Studies (MSDE, 1995) at the fifth grade level contain fifteen competencies. Three standards from the National Science Education Standards (NRC, 1996) were chosen. They include (a) science and technology, (b) science in personal and social perspectives, and (c) the history and nature of science. Each competency for social studies has three lesson plans written that integrate the three chosen standards from the National Science Education Standards. A total of forty-five lesson plans were written integrating science and social studies. Each lesson plan includes an objective, materials, procedures, and evaluation for teachers. Teachers are encouraged to use the lesson plans as a guide in creating their own lesson plans that would correspond to their school's particular curriculum guidelines. Consideration should be given to the learning levels and styles of their classroom. This qualitative study was done to create lesson plans that integrate science and social studies with the hope that teachers will expand upon them and implement them into their curricula.

  17. Integrated corridor management initiative : demonstration phase evaluation, Dallas traveler response analysis test plan.

    DOT National Transportation Integrated Search

    1997-09-26

    This report is forwarded to Congress according to Section 6054(c) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). Specifically, this report: (1) Presents the goals and accomplishments of the ITS Program, which supports the de...

  18. Incident Management : Successful Practices : A Cross-Cutting Study : Improving Mobility And Saving Lives

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Traveler Response Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pro...

  19. Impact of local/short haul operations on driver fatigue : focus group summary and analysis

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Institutional and Organizational Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor Management (ICM) Initiative Demonstrati...

  20. Aircraft Noise Reduction Subproject Overview

    NASA Technical Reports Server (NTRS)

    Fernandez, Hamilton; Nark, Douglas M.; Van Zante, Dale E.

    2016-01-01

    The material presents highlights of propulsion and airframe noise research being completed for the Advanced Air Transport Technology Project. The basis of noise reduction plans along with representative work for the airframe, propulsion, and propulsion-airframe integration is discussed for the Aircraft Noise reduction Subproject.

  1. Whither Sex Education? Excellence in Comprehensive Program Development.

    ERIC Educational Resources Information Center

    Southern, Stephen

    A review of recent sex education literature is presented in an attempt to integrate observations and recommendations related to both program development and innovation acceptance. A Developmental Research and Utilization Model is employed to systematically guide planning, implementation, evaluation, advocacy, and institutionalization. Curriculum…

  2. Multiple-source spatial data fusion and integration research in the region unified planning management information system

    NASA Astrophysics Data System (ADS)

    Liu, Zhijun; Zhang, Liangpei; Liu, Zhenmin; Jiao, Hongbo; Chen, Liqun

    2008-12-01

    In order to manage the internal resources of Gulf of Tonkin and integrate multiple-source spatial data, the establishment of region unified plan management system is needed. The data fusion and the integrated research should be carried on because there are some difficulties in the course of the system's establishment. For example, kinds of planning and the project data format are different, and data criterion is not unified. Besides, the time state property is strong, and spatial reference is inconsistent, etc. In this article the ARCGIS ENGINE is introduced as the developing platform, key technologies are researched, such as multiple-source data transformation and fusion, remote sensing data and DEM fusion and integrated, plan and project data integration, and so on. Practice shows that the system improves the working efficiency of Guangxi Gulf of Tonkin Economic Zone Management Committee significantly and promotes planning construction work of the economic zone remarkably.

  3. On the design of computer-based models for integrated environmental science.

    PubMed

    McIntosh, Brian S; Jeffrey, Paul; Lemon, Mark; Winder, Nick

    2005-06-01

    The current research agenda in environmental science is dominated by calls to integrate science and policy to better understand and manage links between social (human) and natural (nonhuman) processes. Freshwater resource management is one area where such calls can be heard. Designing computer-based models for integrated environmental science poses special challenges to the research community. At present it is not clear whether such tools, or their outputs, receive much practical policy or planning application. It is argued that this is a result of (1) a lack of appreciation within the research modeling community of the characteristics of different decision-making processes including policy, planning, and (2) participation, (3) a lack of appreciation of the characteristics of different decision-making contexts, (4) the technical difficulties in implementing the necessary support tool functionality, and (5) the socio-technical demands of designing tools to be of practical use. This article presents a critical synthesis of ideas from each of these areas and interprets them in terms of design requirements for computer-based models being developed to provide scientific information support for policy and planning. Illustrative examples are given from the field of freshwater resources management. Although computer-based diagramming and modeling tools can facilitate processes of dialogue, they lack adequate simulation capabilities. Component-based models and modeling frameworks provide such functionality and may be suited to supporting problematic or messy decision contexts. However, significant technical (implementation) and socio-technical (use) challenges need to be addressed before such ambition can be realized.

  4. Integration of RAMS in LCC analysis for linear transport infrastructures. A case study for railways.

    NASA Astrophysics Data System (ADS)

    Calle-Cordón, Álvaro; Jiménez-Redondo, Noemi; Morales-Gámiz, F. J.; García-Villena, F. A.; Garmabaki, Amir H. S.; Odelius, Johan

    2017-09-01

    Life-cycle cost (LCC) analysis is an economic technique used to assess the total costs associated with the lifetime of a system in order to support decision making in long term strategic planning. For complex systems, such as railway and road infrastructures, the cost of maintenance plays an important role in the LCC analysis. Costs associated with maintenance interventions can be more reliably estimated by integrating the probabilistic nature of the failures associated to these interventions in the LCC models. Reliability, Maintainability, Availability and Safety (RAMS) parameters describe the maintenance needs of an asset in a quantitative way by using probabilistic information extracted from registered maintenance activities. Therefore, the integration of RAMS in the LCC analysis allows obtaining reliable predictions of system maintenance costs and the dependencies of these costs with specific cost drivers through sensitivity analyses. This paper presents an innovative approach for a combined RAMS & LCC methodology for railway and road transport infrastructures being developed under the on-going H2020 project INFRALERT. Such RAMS & LCC analysis provides relevant probabilistic information to be used for condition and risk-based planning of maintenance activities as well as for decision support in long term strategic investment planning.

  5. Propulsion Health Management System Development for Affordable and Reliable Operation of Space Exploration Systems

    NASA Technical Reports Server (NTRS)

    Melcher, Kevin J.; Maul, William A.; Garg, Sanjay

    2007-01-01

    The constraints of future Exploration Missions will require unique integrated system health management capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays, all require an integrated approach to health management that can span distinct, yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation and support the Exploration Mission from beginning to end. Propulsion is a critical part of any space exploration mission, and monitoring the health of the propulsion system is an integral part of assuring mission safety and success. Health management is a somewhat ubiquitous technology that encompasses a large spectrum of physical components and logical processes. For this reason, it is essential to develop a systematic plan for propulsion health management system development. This paper provides a high-level perspective of propulsion health management systems, and describes a logical approach for the future planning and early development that are crucial to planned space exploration programs. It also presents an overall approach, or roadmap, for propulsion health management system development and a discussion of the associated roadblocks and challenges.

  6. 40 CFR 264.52 - Content of contingency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... waste management provisions that are sufficient to comply with the requirements of this part. The owner... that the plan be based on the National Response Team's Integrated Contingency Plan Guidance (“One Plan”). When modifications are made to non-RCRA provisions in an integrated contingency plan, the changes do...

  7. Integration Plan for the Mid-Region Council of Governments : Central New Mexico Climate Change Scenario Planning Project.

    DOT National Transportation Integrated Search

    2015-04-01

    This Integration Plan for the Central New Mexico Climate Change Scenario Planning Project (CCSP) provides useful information on strategies that the Mid-Region Council of Governments (MRCOG) and its partners can pursue over the next five years to adap...

  8. Integration of second cancer risk calculations in a radiotherapy treatment planning system

    NASA Astrophysics Data System (ADS)

    Hartmann, M.; Schneider, U.

    2014-03-01

    Second cancer risk in patients, in particular in children, who were treated with radiotherapy is an important side effect. It should be minimized by selecting an appropriate treatment plan for the patient. The objectives of this study were to integrate a risk model for radiation induced cancer into a treatment planning system which allows to judge different treatment plans with regard to second cancer induction and to quantify the potential reduction in predicted risk. A model for radiation induced cancer including fractionation effects which is valid for doses in the radiotherapy range was integrated into a treatment planning system. From the three-dimensional (3D) dose distribution the 3D-risk equivalent dose (RED) was calculated on an organ specific basis. In addition to RED further risk coefficients like OED (organ equivalent dose), EAR (excess absolute risk) and LAR (lifetime attributable risk) are computed. A risk model for radiation induced cancer was successfully integrated in a treatment planning system. Several risk coefficients can be viewed and used to obtain critical situations were a plan can be optimised. Risk-volume-histograms and organ specific risks were calculated for different treatment plans and were used in combination with NTCP estimates for plan evaluation. It is concluded that the integration of second cancer risk estimates in a commercial treatment planning system is feasible. It can be used in addition to NTCP modelling for optimising treatment plans which result in the lowest possible second cancer risk for a patient.

  9. Application of life cycle thinking in multidisciplinary multistakeholder contexts for cross-sectoral planning and implementation of sustainable development projects.

    PubMed

    Thabrew, Lanka; Ries, Robert

    2009-07-01

    Development planning and implementation is a multifaceted and multiscale task mainly because of the involvement of multiple stakeholders across sectors and disciplines. Even though top-down sectoral planning is commonly practiced, bottom-up cross-sectoral planning involving all relevant stakeholders in a transdisciplinary learning environment has been recognized as a better option, especially if the goal is to drive development projects toward sustainable implementation (Rowe and Fudge 2003; Müller et al. 2005; Global Development Research Center 2008). Even though many planning approaches have this goal, there are limited decision frameworks that are suitable for achieving consensus among stakeholders from multiple disciplines with sectoral objectives and priorities. In most instances, the upstream and downstream effects of development decisions are not thoroughly investigated or communicated with the relevant stakeholders, strongly affecting cross-sectoral integration in the real world (Wiek, Brundiers, et al. 2006). This article presents methodological aspects of developing a stakeholder based life cycle assessment framework (SBLCA) for upstream-downstream decision analysis in a multistakeholder development planning context. The applicability of the framework is demonstrated using simple examples extracted from a pilot case study conducted in Sri Lanka for sustainable posttsunami reconstruction at a village scale. The applicability of SBLCA in specific planning stages, how it promotes transdisciplinary learning and cross-sectoral stakeholder integration in phases of project cycles, and how local stakeholders can practice life cycle thinking in their village development planning and implementation are discussed.

  10. Healthcare information systems: data mining methods in the creation of a clinical recommender system

    NASA Astrophysics Data System (ADS)

    Duan, L.; Street, W. N.; Xu, E.

    2011-05-01

    Recommender systems have been extensively studied to present items, such as movies, music and books that are likely of interest to the user. Researchers have indicated that integrated medical information systems are becoming an essential part of the modern healthcare systems. Such systems have evolved to an integrated enterprise-wide system. In particular, such systems are considered as a type of enterprise information systems or ERP system addressing healthcare industry sector needs. As part of efforts, nursing care plan recommender systems can provide clinical decision support, nursing education, clinical quality control, and serve as a complement to existing practice guidelines. We propose to use correlations among nursing diagnoses, outcomes and interventions to create a recommender system for constructing nursing care plans. In the current study, we used nursing diagnosis data to develop the methodology. Our system utilises a prefix-tree structure common in itemset mining to construct a ranked list of suggested care plan items based on previously-entered items. Unlike common commercial systems, our system makes sequential recommendations based on user interaction, modifying a ranked list of suggested items at each step in care plan construction. We rank items based on traditional association-rule measures such as support and confidence, as well as a novel measure that anticipates which selections might improve the quality of future rankings. Since the multi-step nature of our recommendations presents problems for traditional evaluation measures, we also present a new evaluation method based on average ranking position and use it to test the effectiveness of different recommendation strategies.

  11. A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System

    NASA Astrophysics Data System (ADS)

    Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji

    Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.

  12. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  13. The Data Management and Communications (DMAC) Strategy for the U.S. Integrated Ocean Observing System (IOOS)

    NASA Astrophysics Data System (ADS)

    Hankin, S.

    2004-12-01

    Data management and communications within the marine environment present great challenges due in equal parts to the variety and complexity of the observations that are involved; the rapidly evolving information technology; and the complex history and relationships among community participants. At present there is no coherent Cyberinfrastructure that effectively integrates these data streams across organizations, disciplines and spatial and temporal scales. The resulting lack of integration of data denies US society important benefits, such as improved climate forecasts and more effective protection of coastal marine ecosystems. Therefore, Congress has directed the US marine science communities to come together to plan, design, and implement a sustained Integrated Ocean Observing System (IOOS). Central to the vision of the IOOS is a Data Management and Communications (DMAC) Subsystem that joins Federal, regional, state, municipal, academic and commercial partners in a seamless data sharing framework. The design of the DMAC Subsystem is made particularly challenging by three competing factors: 1) The data types to be integrated are heterogeneous and have complex structure; 2) The holdings are physically distributed and widely ranging in size and complexity; and 3) IOOS is a loose federation of many organizations, large and small, lacking a management hierarchy. Designing the DMAC Subsystem goes beyond solving problems of software engineering; the most demanding aspects of the solution lie in community behavior. An overview of the plan for the DMAC Subsystem and an outline of the next steps forward will be described.

  14. An exploratory study of healthcare strategic planning in two metropolitan areas.

    PubMed

    Begun, James W; Kaissi, Amer A

    2005-01-01

    Little is known about empirical variation in the extent to which healthcare organizations conduct formal strategic planning or the extent to which strategic planning affects performance. Structural contingency and complexity science theory offer differing interpretations of the value of strategic planning. Structural contingency theory emphasizes adaptation to achieve organizational fit with a changing environment and views strategic planning as a way to chart the organization's path. Complexity science argues that planning is largely futile in changing environments. Interviews of leaders in 20 healthcare organizations in the metropolitan areas of Minneapolis/St. Paul, Minnesota, and San Antonio, Texas, reveal that strategic planning is a common and valued function in healthcare organizations. Respondents emphasized the need to continuously update strategic plans, involve physicians and the governing board, and integrate strategic plans with other organizational plans. Most leaders expressed that strategic planning contributes to organizational focus, fosters stakeholder participation and commitment, and leads to achievement of strategic goals. Because the widespread belief in strategic planning is based largely on experience, intuition, and faith, we present recommendations for developing an evidence base for healthcare strategic planning.

  15. 75 FR 20843 - Notice of Workshop To Discuss Policy-Relevant Science to Inform EPA's Integrated Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Policy-Relevant Science to Inform EPA's Integrated Plan for the Review of the Lead National Ambient Air...-Relevant Science to Inform EPA's Integrated Plan for Review of the National Ambient Air Quality Standards... review focuses on the key policy-relevant issues and considers the most meaningful new science to inform...

  16. MEMS Stirling Cooler Development Update

    NASA Technical Reports Server (NTRS)

    Moran, Matthew E.; Wesolek, Danielle

    2003-01-01

    This presentation provides an update on the effort to build and test a prototype unit of the patented MEMS Stirling cooler concept. A micro-scale regenerator has been fabricated by Polar Thermal Technologies and is currently being integrated into a Stirling cycle simulator at Johns Hopkins University Applied Physics Laboratory. A discussion of the analysis, design, assembly, and test plans for the prototype will be presented.

  17. Integrating transportation/transit planning in the overall planning process.

    DOT National Transportation Integrated Search

    2009-07-01

    The purpose of this report is to produce recommendations that will foster more transportation : and land use integration throughout the overall planning process in Delaware. A trend of : population growth and decentralization necessitates a proactive...

  18. Long-range strategy for remote sensing: an integrated supersystem

    NASA Astrophysics Data System (ADS)

    Glackin, David L.; Dodd, Joseph K.

    1995-12-01

    Present large space-based remote sensing systems, and those planned for the next two decades, remain dichotomous and custom-built. An integrated architecture might reduce total cost without limiting system performance. An example of such an architecture, developed at The Aerospace Corporation, explores the feasibility of reducing overall space systems costs by forming a 'super-system' which will provide environmental, earth resources and theater surveillance information to a variety of users. The concept involves integration of programs, sharing of common spacecraft bus designs and launch vehicles, use of modular components and subsystems, integration of command and control and data capture functions, and establishment of an integrated program office. Smart functional modules that are easily tested and replaced are used wherever possible in the space segment. Data is disseminated to systems such as NASA's EOSDIS, and data processing is performed at established centers of expertise. This concept is advanced for potential application as a follow-on to currently budgeted and planned space-based remote sensing systems. We hope that this work will serve to engender discussion that may be of assistance in leading to multinational remote sensing systems with greater cost effectiveness at no loss of utility to the end user.

  19. Towards G2G: Systems of Technology Database Systems

    NASA Technical Reports Server (NTRS)

    Maluf, David A.; Bell, David

    2005-01-01

    We present an approach and methodology for developing Government-to-Government (G2G) Systems of Technology Database Systems. G2G will deliver technologies for distributed and remote integration of technology data for internal use in analysis and planning as well as for external communications. G2G enables NASA managers, engineers, operational teams and information systems to "compose" technology roadmaps and plans by selecting, combining, extending, specializing and modifying components of technology database systems. G2G will interoperate information and knowledge that is distributed across organizational entities involved that is ideal for NASA future Exploration Enterprise. Key contributions of the G2G system will include the creation of an integrated approach to sustain effective management of technology investments that supports the ability of various technology database systems to be independently managed. The integration technology will comply with emerging open standards. Applications can thus be customized for local needs while enabling an integrated management of technology approach that serves the global needs of NASA. The G2G capabilities will use NASA s breakthrough in database "composition" and integration technology, will use and advance emerging open standards, and will use commercial information technologies to enable effective System of Technology Database systems.

  20. [Doctors-nurses integration in paediatric onco-hematology: a cornerstone for quality of care. Report on a three years experience].

    PubMed

    Di Giulio, Paola; Cotta, Roberto; Bastianello, Donatella; Garaventa, Alberto; Jankovic, Momcilo; Perilongo, Glorgio; Salgarello, M Cristna; Tecchiato, Daniela

    2004-01-01

    The rapid evolution of care and the constantly changing needs and expectations of patients and their families require flexibility and re-organisation of the caring and treatment activities. These include the increased need for high-specialised personal competence; communication and interpersonal skills; and a close collaboration and integration between doctors and nurses--the main professional groups in the health care team. An optimal integration is not always and easily achievable and requires personal motivation, active efforts, investments and the development of the effective operative models for providing the integrated high specialised daily care. It is not easy in the busy daily routine to find time, motivation and share common goals. This is why a support for the groups willing to implement projects for improving integration between doctors and nurses was provided through an action-research laboratory. The aims of the multi-step action-research laboratory were the following: to improve the integration of different professionals; to improve the exchange of knowledge and skills; to build the necessary bases for planning and running comprehensive, integrated clinical projects in the field of paediatric haematology-oncology. The ultimate goals of this effort was to improve the quality of the care and cure provided to children with cancer and their families. The project lasted three years, and consisted of yearly residential meetings alternating with experiences conducted in the working environments of the participants. The following steps were planned: Identification of the problem. Participants were asked to analyse the main problems of their units, that could be solved-improved with a better integration/collaboration between doctors and nurses and the main difficulties routinely encountered in working effectively together. Groups were asked to analyse the problem in their own practice, identify the possible solutions, main obstacles, strengths and weaknesses, plan the necessary of activities (short and medium term) for improving the problems. Sharing of projects. The projects were shared and common problems and solutions discussed. Final presentation of the projects with the aim of devising solutions and strategies for consolidation of the eventual changes obtained. Supervision, theoretical support and personalised feed-back from the scientific panel were guaranteed between the meetings and during the planning and implementation phases. Methods, instruments and techniques for improving collaboration and integration were discussed during the yearly meetings (i.e. how to work by objectives; how to plan and co-ordinate multidisciplinary meetings...) with lectures, workgroups, role-playing. Representatives from the 16 wards participated to the project: at least one nurse and one doctor from each centre, in the position to take decisions and implement changes. In spite of common problems related to the workload, difficulties in involving other colleagues, 13 projects were implemented. The need to discuss, plan together, organise interdisciplinary meetings improved the integration and communication between doctors and nurses.

  1. Integrating Climate Change Science and Sustainability in Environmental Science, Sociology, Philosophy and Business Courses.

    NASA Astrophysics Data System (ADS)

    Boudrias, M. A.; Cantzler, J.; Croom, S.; Huston, C.; Woods, M.

    2015-12-01

    Courses on sustainability can be taught from multiple perspectives with some focused on specific areas (environmental, socio-cultural, economic, ethics) and others taking a more integrated approach across areas of sustainability and academic disciplines. In conjunction with the Climate Change Education Program efforts to enhance climate change literacy with innovative approaches, resources and communication strategies developed by Climate Education Partners were used in two distinct ways to integrate climate change science and impacts into undergraduate and graduate level courses. At the graduate level, the first lecture in the MBA program in Sustainable Supply Chain Management is entirely dedicated to climate change science, local and global impacts and discussions about key messages to communicate to the business community. Basic science concepts are integrated with discussions about mitigation and adaptation focused on business leaders. The concepts learned are then applied to the semester-long business plan project for the students. At the undergraduate level, a new model of comprehensive integration across disciplines was implemented in Spring 2015 across three courses on Sustainability each with a specific lens: Natural Science, Sociology and Philosophy. All three courses used climate change as the 'big picture' framing concept and had similar learning objectives creating a framework where lens-specific topics, focusing on depth in a discipline, were balanced with integrated exercises across disciplines providing breadth and possibilities for integration. The comprehensive integration project was the creation of the climate action plan for the university with each team focused on key areas of action (water, energy, transportation, etc.) and each team built with at least one member from each class ensuring a natural science, sociological and philosophical perspective. The final project was presented orally to all three classes and an integrated paper included all three perspectives. The best projects are being compiled so they can be shared with the University of San Diego's planning committee.

  2. Lost in Translation: the Case for Integrated Testing

    NASA Technical Reports Server (NTRS)

    Young, Aaron

    2017-01-01

    The building of a spacecraft is complex and often involves multiple suppliers and companies that have their own designs and processes. Standards have been developed across the industries to reduce the chances for critical flight errors at the system level, but the spacecraft is still vulnerable to the introduction of critical errors during integration of these systems. Critical errors can occur at any time during the process and in many cases, human reliability analysis (HRA) identifies human error as a risk driver. Most programs have a test plan in place that is intended to catch these errors, but it is not uncommon for schedule and cost stress to result in less testing than initially planned. Therefore, integrated testing, or "testing as you fly," is essential as a final check on the design and assembly to catch any errors prior to the mission. This presentation will outline the unique benefits of integrated testing by catching critical flight errors that can otherwise go undetected, discuss HRA methods that are used to identify opportunities for human error, lessons learned and challenges over ownership of testing will be discussed.

  3. The planning coordinator: A design architecture for autonomous error recovery and on-line planning of intelligent tasks

    NASA Technical Reports Server (NTRS)

    Farah, Jeffrey J.

    1992-01-01

    Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.

  4. Groundwater regulation and integrated planning

    USGS Publications Warehouse

    Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.

    2016-01-01

    The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.

  5. The Education of the Gifted Child in Canada.

    ERIC Educational Resources Information Center

    Nash, Chris, Ed.

    1989-01-01

    Fourteen articles on the education of the gifted child in Canada are presented. Topics addressed include the giftedness construct, Canadian law and policy, integrative program policy, program planning and evaluation, teacher training, disabled gifted students, psychosocial dimensions of giftedness, the Ontario experience, innovative and…

  6. 77 FR 20792 - New England Fishery Management Council (NEFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... experimental fishery permit applications that have been made available since the January 2012 Council meeting... will present information about future plans for the federal sea scallop survey, including the integration of Habcam (towed underwater camera) results with existing survey technologies. The Enforcement...

  7. Sensual Sexuality Education with Young Parenting Women

    ERIC Educational Resources Information Center

    Gubrium, Aline C.; Shafer, Miriam B.

    2014-01-01

    Comprehensive sexuality education curricula that incorporate sex positive and integrated approaches go beyond a presentation of facts and strategies for prevention to emphasize the promotion of sexual subjectivity and wellbeing. A pilot sensual sexuality education program was planned, implemented and informally evaluated with young parenting women…

  8. Closing the Loop Sampler.

    ERIC Educational Resources Information Center

    California Integrated Waste Management Board, Sacramento.

    Closing the Loop (CTL) is a science curriculum designed to introduce students to integrated waste management through awareness. This document presents five lesson plans focusing on developing an understanding of natural resources, solid wastes, conservation, and the life of landfills. Contents include: (1) "What Are Natural Resources?"; (2)…

  9. 1995 Truck Size and Weight Performance-Based Workshop report : activity 5 : document North American and European experiences

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  10. The MAP program: building the digital terrain model.

    Treesearch

    R.H. Twito; R.W. Mifflin; R.J. McGaughey

    1987-01-01

    PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. MAP, an integral program in the PLANS package, is used to construct the digital terrain models required by PLANS. MAP establishes digital terrain models using digitizer-traced...

  11. National Conference on Integrated Resource Planning: Proceedings

    NASA Astrophysics Data System (ADS)

    Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.

  12. Tug fleet and ground operations schedules and controls. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.

  13. An integrated approach: managing resources for post-disaster reconstruction.

    PubMed

    Chang, Yan; Wilkinson, Suzanne; Brunsdon, David; Seville, Erica; Potangaroa, Regan

    2011-10-01

    A lack of resources for post-disaster housing reconstruction significantly limits the prospects for successful recovery. Following the earthquake in Wenchuan, China, in May 2008, housing reconstruction was not immune to resource shortages and price inflation. Difficulties in sourcing materials and labour considerably impeded recovery. This paper provides evidence of the resourcing bottlenecks inherent in the post-Wenchuan earthquake reconstruction process. Its aim is to present an integrated planning framework for managing resources for post-disaster housing rebuilding. The results are drawn from in-field surveys that highlight the areas where stakeholders need to concentrate effort, including revising legislation and policy, enhancing capacity for rebuilding in the construction industry, strengthening the transportation network, restructuring market mechanisms, and incorporating environmental considerations into overall planning. Although the case study presented here is country-specific, it is hoped that the findings provide a basis for future research to identify resourcing constraints and solutions in other disaster contexts. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.

  14. Toward Technology Integration in Mathematics Education: A Technology-Integration Course Planning Assignment

    ERIC Educational Resources Information Center

    Kersaint, Gladis

    2007-01-01

    This article describes a technology integration course planning assignment that was developed to enhance preservice teachers' technological pedagogical content knowledge (TPCK). This assignment required preservice teachers work with peers to integrate various technological tools (e.g., graphing calculators, web-based mathematics applets, etc) in a…

  15. Participatory Scenario Planning for Climate Change Adaptation: the Maui Groundwater Project

    NASA Astrophysics Data System (ADS)

    Keener, V. W.; Brewington, L.; Finucane, M.

    2015-12-01

    For the last century, the island of Maui in Hawai'i has been the center of environmental, agricultural, and legal conflict with respect to both surface and groundwater allocation. Planning for sustainable future freshwater supply in Hawai'i requires adaptive policies and decision-making that emphasizes private and public partnerships and knowledge transfer between scientists and non-scientists. We have downscaled dynamical climate models to 1 km resolution in Maui and coupled them with a USGS Water Budget model and a participatory scenario building process to quantify future changes in island-scale climate and groundwater recharge under different land uses. Although these projections are uncertain, the integrated nature of the Pacific RISA research program has allowed us to take a multi-pronged approach to facilitate the uptake of climate information into policy and management. This presentation details the ongoing work to support the development of Hawai'i's first island-wide water use plan under the new climate adaptation directive. Participatory scenario planning began in 2012 to bring together a diverse group of ~100 decision-makers in state and local government, watershed restoration, agriculture, and conservation to 1) determine the type of information (climate variables, land use and development, agricultural practices) they would find helpful in planning for climate change, and 2) develop a set of nested scenarios that represent alternative climate and management futures. This integration of knowledge is an iterative process, resulting in flexible and transparent narratives of complex futures comprised of information at multiple scales. We will present an overview of the downscaling, scenario building, hydrological modeling processes, and stakeholder response.

  16. Climate-Smart Design for Ecosystem Management: A Test Application for Coral Reefs.

    PubMed

    West, Jordan M; Courtney, Catherine A; Hamilton, Anna T; Parker, Britt A; Julius, Susan H; Hoffman, Jennie; Koltes, Karen H; MacGowan, Petra

    2017-01-01

    The interactive and cumulative impacts of climate change on natural resources such as coral reefs present numerous challenges for conservation planning and management. Climate change adaptation is complex due to climate-stressor interactions across multiple spatial and temporal scales. This leaves decision makers worldwide faced with local, regional, and global-scale threats to ecosystem processes and services, occurring over time frames that require both near-term and long-term planning. Thus there is a need for structured approaches to adaptation planning that integrate existing methods for vulnerability assessment with design and evaluation of effective adaptation responses. The Corals and Climate Adaptation Planning project of the U.S. Coral Reef Task Force seeks to develop guidance for improving coral reef management through tailored application of a climate-smart approach. This approach is based on principles from a recently-published guide which provides a framework for adopting forward-looking goals, based on assessing vulnerabilities to climate change and applying a structured process to design effective adaptation strategies. Work presented in this paper includes: (1) examination of the climate-smart management cycle as it relates to coral reefs; (2) a compilation of adaptation strategies for coral reefs drawn from a comprehensive review of the literature; (3) in-depth demonstration of climate-smart design for place-based crafting of robust adaptation actions; and (4) feedback from stakeholders on the perceived usefulness of the approach. We conclude with a discussion of lessons-learned on integrating climate-smart design into real-world management planning processes and a call from stakeholders for an "adaptation design tool" that is now under development.

  17. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  18. Integrated skin flash planning technique for intensity-modulated radiation therapy for vulvar cancer prevents marginal misses and improves superficial dose coverage.

    PubMed

    Dyer, Brandon A; Jenshus, Abriel; Mayadev, Jyoti S

    2018-02-28

    Radiation therapy (RT) plays a definitive role in locally advanced vulvar cancer, and in the adjuvant setting with high risk postoperative features after wide local excision. There is significant morbidity associated with traditional, large RT fields using 2D or 3D techniques, and the use of intensity-modulated radiation therapy (IMRT) in vulvar cancer is increasing. However, there remains a paucity of technical information regarding the prevention of a marginal miss during the treatment planning process. The use of an integrated skin flash (ISF) during RT planning can be used to account for anatomic variation, and intra- and interfraction motion seen during treatment. Herein we present the case of a patient with a T1aN0M0, Stage IA vulva cancer to illustrate the progressive vulvar swelling and lymph edema seen during treatment and retrospectively evaluate the dosimetric effects of using an ISF RT plan vs standard RT planning techniques. Standard planning techniques to treat vulvar cancer patients with IMRT do not sufficiently account for the change in patient anatomy and can lead to a marginal miss. ISF is an RT planning technique that can decrease the risk of a marginal miss and the technique is easily implemented during the planning stages of RT treatment. Furthermore, use of an ISF technique can improve vulvar clinical target volume coverage and plan homogeneity. Based on our experience, and this study, a 2-cm ISF is suggested to account for variations in daily clinical setup and changes in patient anatomy during treatment. Published by Elsevier Inc.

  19. Research and applications: Artificial intelligence

    NASA Technical Reports Server (NTRS)

    Raphael, B.; Duda, R. O.; Fikes, R. E.; Hart, P. E.; Nilsson, N. J.; Thorndyke, P. W.; Wilber, B. M.

    1971-01-01

    Research in the field of artificial intelligence is discussed. The focus of recent work has been the design, implementation, and integration of a completely new system for the control of a robot that plans, learns, and carries out tasks autonomously in a real laboratory environment. The computer implementation of low-level and intermediate-level actions; routines for automated vision; and the planning, generalization, and execution mechanisms are reported. A scenario that demonstrates the approximate capabilities of the current version of the entire robot system is presented.

  20. Deep pockets or blueprint for change: traumatic brain injury (TBI) proactive strategy.

    PubMed

    Wood, D W; Pohl, S; Lawler, S; Okamoto, G

    1998-09-01

    The Pacific Conference scheduled for October 1-3, 1988, is a critical event in the development of an integrated community-based plan for a comprehensive continuum of services to address the "silent epidemic," Traumatic Brain Injured (TBI). This paper provides insights of the complex nature and the special problems faced by the TBI survivors; their families, natural supports and caregivers, as well as the health, social and educational care providers in Hawaii. Process for the development of the community plan is presented.

  1. Integrated technology wing study (oral presentation)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The design of a plan for a commercial transport manufacturer to integrate advanced technology into a new wing for a derivative and/or new aircraft that could enter service in the late 1980s to early 1990s time period is proposed. The development of a new wing for a derivative or a new long range commercial aircraft and the incorporation of cost effective technologies are studied. The decision provides guidelines for the best allocation of research funds.

  2. Ares I Integrated Test Approach

    NASA Technical Reports Server (NTRS)

    Taylor, Jim

    2008-01-01

    This slide presentation reviews the testing approach that NASA is developing for the Ares I launch vehicle. NASA is planning a complete series of development, qualification and verification tests. These include: (1) Upper stage engine sea-level and altitude testing (2) First stage development and qualification motors (3) Upper stage structural and thermal development and qualification test articles (4) Main Propulsion Test Article (MPTA) (5) Upper stage green run testing (6) Integrated Vehicle Ground Vibration Testing (IVGVT) and (7) Aerodynamic characterization testing.

  3. Future applications of artificial intelligence to Mission Control Centers

    NASA Technical Reports Server (NTRS)

    Friedland, Peter

    1991-01-01

    Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.

  4. The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less

  5. Integrated risk/cost planning models for the US Air Traffic system

    NASA Technical Reports Server (NTRS)

    Mulvey, J. M.; Zenios, S. A.

    1985-01-01

    A prototype network planning model for the U.S. Air Traffic control system is described. The model encompasses the dual objectives of managing collision risks and transportation costs where traffic flows can be related to these objectives. The underlying structure is a network graph with nonseparable convex costs; the model is solved efficiently by capitalizing on its intrinsic characteristics. Two specialized algorithms for solving the resulting problems are described: (1) truncated Newton, and (2) simplicial decomposition. The feasibility of the approach is demonstrated using data collected from a control center in the Midwest. Computational results with different computer systems are presented, including a vector supercomputer (CRAY-XMP). The risk/cost model has two primary uses: (1) as a strategic planning tool using aggregate flight information, and (2) as an integrated operational system for forecasting congestion and monitoring (controlling) flow throughout the U.S. In the latter case, access to a supercomputer is required due to the model's enormous size.

  6. Integration of Treatment Innovation Planning and Implementation: Strategic Process Models and Organizational Challenges

    PubMed Central

    Lehman, Wayne E. K.; Simpson, D. Dwayne; Knight, Danica K.; Flynn, Patrick M.

    2015-01-01

    Sustained and effective use of evidence-based practices in substance abuse treatment services faces both clinical and contextual challenges. Implementation approaches are reviewed that rely on variations of plan-do-study-act (PDSA) cycles, but most emphasize conceptual identification of core components for system change strategies. A 2-phase procedural approach is therefore presented based on the integration of TCU models and related resources for improving treatment process and program change. Phase 1 focuses on the dynamics of clinical services, including stages of client recovery (cross-linked with targeted assessments and interventions), as the foundations for identifying and planning appropriate innovations to improve efficiency and effectiveness. Phase 2 shifts to the operational and organizational dynamics involved in implementing and sustaining innovations (including the stages of training, adoption, implementation, and practice). A comprehensive system of TCU assessments and interventions for client and program-level needs and functioning are summarized as well, with descriptions and guidelines for applications in practical settings. PMID:21443294

  7. The Six-District Plan. Integration of the Springfield, Mass., Elementary Schools. A Report of the Massachusetts Advisory Committee to the United States Commission on Civil Rights.

    ERIC Educational Resources Information Center

    Chin, Laura, Ed.

    This report reviews the first year of integration, under the implementation of the Six-District Plan, of the elementary schools in Springfield, Massachusetts. Through this plan the school department changed the racial composition in five previously imbalanced elementary schools and integrated the elementary school system. Redistricting, the…

  8. Planning for Space Station Freedom laboratory payload integration

    NASA Technical Reports Server (NTRS)

    Willenberg, Harvey J.; Torre, Larry P.

    1989-01-01

    Space Station Freedom is being developed to support extensive missions involving microgravity research and applications. Requirements for on-orbit payload integration and the simultaneous payload integration of multiple mission increments will provide the stimulus to develop new streamlined integration procedures in order to take advantage of the increased capabilities offered by Freedom. The United States Laboratory and its user accommodations are described. The process of integrating users' experiments and equipment into the United States Laboratory and the Pressurized Logistics Modules is described. This process includes the strategic and tactical phases of Space Station utilization planning. The support that the Work Package 01 Utilization office will provide to the users and hardware developers, in the form of Experiment Integration Engineers, early accommodation assessments, and physical integration of experiment equipment, is described. Plans for integrated payload analytical integration are also described.

  9. Description of a dual fail-operational redundant strapdown inertial measurement unit for integrated avionics systems research

    NASA Technical Reports Server (NTRS)

    Bryant, W. H.; Morrell, F. R.

    1981-01-01

    Attention is given to a redundant strapdown inertial measurement unit for integrated avionics. The system consists of four two-degree-of-freedom turned rotor gyros and four two-degree-of-freedom accelerometers in a skewed and separable semi-octahedral array. The unit is coupled through instrument electronics to two flight computers which compensate sensor errors. The flight computers are interfaced to the microprocessors and process failure detection, isolation, redundancy management and flight control/navigation algorithms. The unit provides dual fail-operational performance and has data processing frequencies consistent with integrated avionics concepts presently planned.

  10. Design and development of integral heat pipe/thermal energy storage devices. [used with spacecraft cryocoolers

    NASA Technical Reports Server (NTRS)

    Mahefkey, E. T.; Richter, R.

    1981-01-01

    The major design and performance test subtasks in the development of small (200 to 1,000 whr) integral heat pipe/thermal energy storage devices for use with thermally driven spacecraft cryo-coolers are described. The design of the integral heat pipe/thermal energy storage device was based on a quasi steady resistance heat transfer, lumped capacitance model. Design considerations for the heat pipe and thermal storage annuli are presented. The thermomechanical stress and insulation system design for the device are reviewed. Experimental correlations are described, as are the plans for the further development of the concept.

  11. Integrated multidisciplinary design optimization of rotorcraft

    NASA Technical Reports Server (NTRS)

    Adelman, Howard M.; Mantay, Wayne R.

    1989-01-01

    The NASA/Army research plan for developing the logic elements for helicopter rotor design optimization by integrating appropriate disciplines and accounting for important interactions among the disciplines is discussed. The paper describes the optimization formulation in terms of the objective function, design variables, and constraints. The analysis aspects are discussed, and an initial effort at defining the interdisciplinary coupling is summarized. Results are presented on the achievements made in the rotor aerodynamic performance optimization for minimum hover horsepower, rotor dynamic optimization for vibration reduction, rotor structural optimization for minimum weight, and integrated aerodynamic load/dynamics optimization for minimum vibration and weight.

  12. Design and development of integral heat pipe/thermal energy storage devices

    NASA Astrophysics Data System (ADS)

    Mahefkey, E. T.; Richter, R.

    1981-06-01

    The major design and performance test subtasks in the development of small (200 to 1,000 whr) integral heat pipe/thermal energy storage devices for use with thermally driven spacecraft cryo-coolers are described. The design of the integral heat pipe/thermal energy storage device was based on a quasi steady resistance heat transfer, lumped capacitance model. Design considerations for the heat pipe and thermal storage annuli are presented. The thermomechanical stress and insulation system design for the device are reviewed. Experimental correlations are described, as are the plans for the further development of the concept.

  13. Integration and verification testing of the Large Synoptic Survey Telescope camera

    NASA Astrophysics Data System (ADS)

    Lange, Travis; Bond, Tim; Chiang, James; Gilmore, Kirk; Digel, Seth; Dubois, Richard; Glanzman, Tom; Johnson, Tony; Lopez, Margaux; Newbry, Scott P.; Nordby, Martin E.; Rasmussen, Andrew P.; Reil, Kevin A.; Roodman, Aaron J.

    2016-08-01

    We present an overview of the Integration and Verification Testing activities of the Large Synoptic Survey Telescope (LSST) Camera at the SLAC National Accelerator Lab (SLAC). The LSST Camera, the sole instrument for LSST and under construction now, is comprised of a 3.2 Giga-pixel imager and a three element corrector with a 3.5 degree diameter field of view. LSST Camera Integration and Test will be taking place over the next four years, with final delivery to the LSST observatory anticipated in early 2020. We outline the planning for Integration and Test, describe some of the key verification hardware systems being developed, and identify some of the more complicated assembly/integration activities. Specific details of integration and verification hardware systems will be discussed, highlighting some of the technical challenges anticipated.

  14. Missions to the sun and to the earth. [planning of NASA Solar Terrestrial Program

    NASA Technical Reports Server (NTRS)

    Timothy, A. F.

    1978-01-01

    The program outlined in the present paper represents an optimized plan of solar terrestrial physics. It is constrained only in the sense that it involves not more than one new major mission per year for the Solar Terrestrial Division during the 1980-1985 period. However, the flight activity proposed, if accepted by the Agency and by Congress, would involve a growth in the existing Solar Terrestrial budget by more than a factor of 2. Thus, the program may be considered as somewhat optimistic when viewed in the broader context of the NASA goals and budget. The Agency's integrated FY 1980 Five Year Plan will show how many missions proposed will survive this planning process.

  15. The road plan model: Information model for planning road building activities

    NASA Technical Reports Server (NTRS)

    Azinhal, Rafaela K.; Moura-Pires, Fernando

    1994-01-01

    The general building contractor is presented with an information model as an approach for deriving a high-level work plan of construction activities applied to road building. Road construction activities are represented in a Road Plan Model (RPM), which is modeled in the ISO standard STEP/EXPRESS and adopts various concepts from the GARM notation. The integration with the preceding road design stage and the succeeding phase of resource scheduling is discussed within the framework of a Road Construction Model. Construction knowledge is applied to the road design and the terrain model of the surrounding road infrastructure for the instantiation of the RPM. Issues regarding the implementation of a road planner application supporting the RPM are discussed.

  16. Rational decision perspectives on alcohol consumption by youth. Revising the theory of planned behavior.

    PubMed

    Kuther, Tara L

    2002-01-01

    Cognitive and developmental approaches have made great strides in describing and predicting alcohol consumption by youth. The present review examines several theories of decision making with regard to alcohol consumption, including subjective expected utility (SEU) theory, the theories of reasoned action and planned behavior, and alcohol-related outcome expectancy theory. In addition, the developmental literature on the contribution of parents and peers to adolescent alcohol consumption is reviewed. A model is proposed, which integrates the theory of planned behavior and alcohol-related outcome expectancy theory with modifications based on findings from the developmental literature. Implications for further research are discussed.

  17. NASA Global Hawk: A New Tool for Earth Science Research

    NASA Technical Reports Server (NTRS)

    Hall, Phill

    2009-01-01

    This slide presentation reviews the Global Hawk, a unmanned aerial vehicle (UAV) that NASA plans to use for Earth Sciences research. The Global Hawk is the world's first fully autonomous high-altitude, long-endurance aircraft, and is capable of conducting long duration missions. Plans are being made for the use of the aircraft on missions in the Arctic, Pacific and Western Atlantic Oceans. There are slides showing the Global Hawk Operations Center (GHOC), Flight Control and Air Traffic Control Communications Architecture, and Payload Integration and Accommodations on the Global Hawk. The first science campaign, planned for a study of the Pacific Ocean, is reviewed.

  18. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  19. A solution procedure for mixed-integer nonlinear programming formulation of supply chain planning with quantity discounts under demand uncertainty

    NASA Astrophysics Data System (ADS)

    Yin, Sisi; Nishi, Tatsushi

    2014-11-01

    Quantity discount policy is decision-making for trade-off prices between suppliers and manufacturers while production is changeable due to demand fluctuations in a real market. In this paper, quantity discount models which consider selection of contract suppliers, production quantity and inventory simultaneously are addressed. The supply chain planning problem with quantity discounts under demand uncertainty is formulated as a mixed-integer nonlinear programming problem (MINLP) with integral terms. We apply an outer-approximation method to solve MINLP problems. In order to improve the efficiency of the proposed method, the problem is reformulated as a stochastic model replacing the integral terms by using a normalisation technique. We present numerical examples to demonstrate the efficiency of the proposed method.

  20. Integrated oncology and palliative care: five years experience at the National Cancer Institute of Mexico.

    PubMed

    Allende-Pérez, Silvia; Verástegui-Avilés, Emma; Mohar-Betancourt, Alejandro; Meneses-García, Abelardo; Herrera-Gómez, Angel

    2016-04-01

    Under the national plan for addressing cancer, prevention and detection play important roles. However, the cost of treatments and late diagnosis represent a significant burden on health services. At the National Cancer Institute, more than half of patients present with tumors in advanced stages, and approximately 10% of patients seen for the first time exhibit terminal-stage malignancies, where there are no feasible cancer treatment options, and the patients are instead admitted to the hospital exclusively for palliative symptomatic management. In 2010, the National Cancer Plan began implementing a model of integrative management of palliative care in oncology that has gradually come to include symptomatic palliative care, involving ambulatory, distant and hospitalized management of patients with cancer, in its final stages and, more recently, in earlier stages.

  1. Development of an integrated data base for land use and water quality planning

    NASA Technical Reports Server (NTRS)

    Adams, J.; Vanschayk, C.; Istvan, L. B.

    1977-01-01

    To help understand the role played by different land resources in water quality management a computer based data system was created. The Land Resource Information System (LRIS) allows data to be readily retrieved or statistically analyzed for a variety of purposes. It is specifically formatted to perform coordination of water quality data with logy, etc. New understanding of the region gained through the use of LRIS has gone well beyond the initial purpose of assessing water quality conditions. The land use and natural features information has provided a well defined starting point for a systematic evaluation of proposed land uses, transportation, housing, and other public investments. It has laid the foundation for a comprehensive and integrated approach to many different planning and investment programs presently underway.

  2. Greenville ISD. Integrated Lesson Plans.

    ERIC Educational Resources Information Center

    East Texas State Univ., Commerce. Educational Development and Training Center.

    This packet contains nine lesson plans for integrated academic and vocational education courses. Lesson plans for the following courses are included: industrial technology, automotive technology, English, mathematical applications, science, home economics, and mathematics. Some of the topics covered are as follows: mechanical drawing, automobile…

  3. Planning for Integrating Teaching Technologies

    ERIC Educational Resources Information Center

    Aaron, Mandie; Dicks, Dennis; Ives, Cindy; Montgomery, Brenda

    2004-01-01

    Teaching technologies offer pedagogical advantages which vary with specific contexts. Successfully integrating them hinges on clearly identifying pedagogical goals, then planning for the many decisions that technological change demands. In examining different ways of organizing this process, we have applied planning tools from other…

  4. Progress on development of an airborne two-micron IPDA lidar for water vapor and carbon dioxide column measurements

    NASA Astrophysics Data System (ADS)

    Singh, Upendra N.; Petros, Mulugeta; Refaat, Tamer F.; Yu, Jirong; Antill, Charles W.; Taylor, Bryant D.; Bowen, Stephen C.; Welters, Angela M.; Remus, Ruben G.; Wong, Teh-Hwa; Reithmaier, Karl; Lee, Jane; Ismail, Syed

    2017-09-01

    An airborne 2-μm triple-pulse integrated path differential absorption (IPDA) lidar is currently under development at NASA Langley Research Center (LaRC). This lidar targets both atmospheric carbon dioxide (CO2) and water vapor (H2O) column measurements, simultaneously. Advancements in the development of this IPDA lidar are presented in this paper. Updates on advanced two-micron triple-pulse high-energy laser transmitter will be given including packaging and lidar integration status. In addition, receiver development updates will also be presented. This includes a state-of-the-art detection system integrated at NASA Goddard Space Flight Center. This detection system is based on a newly developed HgCdTe (MCT) electron-initiated avalanche photodiode (e-APD) array. Future plan for IPDA lidar system for ground integration, testing and flight validation will be discussed.

  5. Progress on Development of an Airborne Two-Micron IPDA Lidar for Water Vapor and Carbon Dioxide Column Measurements

    NASA Technical Reports Server (NTRS)

    Singh, Upendra N.; Petros, Mulugeta; Refaat, Tamer F.; Yu, Jirong; Antill, Charles W.; Taylor, Bryant D.; Bowen, Stephen C.; Welters, Angela M.; Remus, Ruben G.; Wong, Teh-Hwa; hide

    2014-01-01

    An airborne 2 micron triple-pulse integrated path differential absorption (IPDA) lidar is currently under development at NASA Langley Research Center (LaRC). This lidar targets both atmospheric carbon dioxide (CO2) and water vapor (H2O) column measurements, simultaneously. Advancements in the development of this IPDA lidar are presented in this paper. Updates on advanced two-micron triple-pulse high-energy laser transmitter will be given including packaging and lidar integration status. In addition, receiver development updates will also be presented. This includes a state-of-the-art detection system integrated at NASA Goddard Space Flight Center. This detection system is based on a newly developed HgCdTe (MCT) electron-initiated avalanche photodiode (e-APD) array. Future plan for IPDA lidar system for ground integration, testing and flight validation will be discussed.

  6. Integrated Wind Power Planning Tool

    NASA Astrophysics Data System (ADS)

    Rosgaard, Martin; Giebel, Gregor; Skov Nielsen, Torben; Hahmann, Andrea; Sørensen, Poul; Madsen, Henrik

    2013-04-01

    This poster presents the current state of the public service obligation (PSO) funded project PSO 10464, with the title "Integrated Wind Power Planning Tool". The goal is to integrate a mesoscale numerical weather prediction (NWP) model with purely statistical tools in order to assess wind power fluctuations, with focus on long term power system planning for future wind farms as well as short term forecasting for existing wind farms. Currently, wind power fluctuation models are either purely statistical or integrated with NWP models of limited resolution. Using the state-of-the-art mesoscale NWP model Weather Research & Forecasting model (WRF) the forecast error is sought quantified in dependence of the time scale involved. This task constitutes a preparative study for later implementation of features accounting for NWP forecast errors in the DTU Wind Energy maintained Corwind code - a long term wind power planning tool. Within the framework of PSO 10464 research related to operational short term wind power prediction will be carried out, including a comparison of forecast quality at different mesoscale NWP model resolutions and development of a statistical wind power prediction tool taking input from WRF. The short term prediction part of the project is carried out in collaboration with ENFOR A/S; a Danish company that specialises in forecasting and optimisation for the energy sector. The integrated prediction model will allow for the description of the expected variability in wind power production in the coming hours to days, accounting for its spatio-temporal dependencies, and depending on the prevailing weather conditions defined by the WRF output. The output from the integrated short term prediction tool constitutes scenario forecasts for the coming period, which can then be fed into any type of system model or decision making problem to be solved. The high resolution of the WRF results loaded into the integrated prediction model will ensure a high accuracy data basis is available for use in the decision making process of the Danish transmission system operator. The need for high accuracy predictions will only increase over the next decade as Denmark approaches the goal of 50% wind power based electricity in 2025 from the current 20%.

  7. Automated radiotherapy treatment plan integrity verification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yang Deshan; Moore, Kevin L.

    2012-03-15

    Purpose: In our clinic, physicists spend from 15 to 60 min to verify the physical and dosimetric integrity of radiotherapy plans before presentation to radiation oncology physicians for approval. The purpose of this study was to design and implement a framework to automate as many elements of this quality control (QC) step as possible. Methods: A comprehensive computer application was developed to carry out a majority of these verification tasks in the Philips PINNACLE treatment planning system (TPS). This QC tool functions based on both PINNACLE scripting elements and PERL sub-routines. The core of this technique is the method ofmore » dynamic scripting, which involves a PERL programming module that is flexible and powerful for treatment plan data handling. Run-time plan data are collected, saved into temporary files, and analyzed against standard values and predefined logical rules. The results were summarized in a hypertext markup language (HTML) report that is displayed to the user. Results: This tool has been in clinical use for over a year. The occurrence frequency of technical problems, which would cause delays and suboptimal plans, has been reduced since clinical implementation. Conclusions: In addition to drastically reducing the set of human-driven logical comparisons, this QC tool also accomplished some tasks that are otherwise either quite laborious or impractical for humans to verify, e.g., identifying conflicts amongst IMRT optimization objectives.« less

  8. A system safety model for developmental aircraft programs

    NASA Technical Reports Server (NTRS)

    Amberboy, E. J.; Stokeld, R. L.

    1982-01-01

    Basic tenets of safety as applied to developmental aircraft programs are presented. The integration of safety into the project management aspects of planning, organizing, directing and controlling is illustrated by examples. The basis for project management use of safety and the relationship of these management functions to 'real-world' situations is presented. The rationale which led to the safety-related project decision and the lessons learned as they may apply to future projects are presented.

  9. Hitchhiker mission operations: Past, present, and future

    NASA Technical Reports Server (NTRS)

    Anderson, Kathryn

    1995-01-01

    What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.

  10. Integration and Test of Shuttle Small Payloads

    NASA Technical Reports Server (NTRS)

    Wright, Michael R.

    2003-01-01

    Recommended approaches for space shuttle small payload integration and test (I&T) are presented. The paper is intended for consideration by developers of shuttle small payloads, including I&T managers, project managers, and system engineers. Examples and lessons learned are presented based on the extensive history of NASA's Hitchhiker project. All aspects of I&T are presented, including: (1) I&T team responsibilities, coordination, and communication; (2) Flight hardware handling practices; (3) Documentation and configuration management; (4) I&T considerations for payload development; (5) I&T at the development facility; (6) Prelaunch operations, transfer, orbiter integration and interface testing; (7) Postflight operations. This paper is of special interest to those payload projects that have small budgets and few resources: that is, the truly faster, cheaper, better projects. All shuttle small payload developers are strongly encouraged to apply these guidelines during I&T planning and ground operations to take full advantage of today's limited resources and to help ensure mission success.

  11. Operationalizing the Learning Health Care System in an Integrated Delivery System

    PubMed Central

    Psek, Wayne A.; Stametz, Rebecca A.; Bailey-Davis, Lisa D.; Davis, Daniel; Darer, Jonathan; Faucett, William A.; Henninger, Debra L.; Sellers, Dorothy C.; Gerrity, Gloria

    2015-01-01

    Introduction: The Learning Health Care System (LHCS) model seeks to utilize sophisticated technologies and competencies to integrate clinical operations, research and patient participation in order to continuously generate knowledge, improve care, and deliver value. Transitioning from concept to practical application of an LHCS presents many challenges but can yield opportunities for continuous improvement. There is limited literature and practical experience available in operationalizing the LHCS in the context of an integrated health system. At Geisinger Health System (GHS) a multi-stakeholder group is undertaking to enhance organizational learning and develop a plan for operationalizing the LHCS system-wide. We present a framework for operationalizing continuous learning across an integrated delivery system and lessons learned through the ongoing planning process. Framework: The framework focuses attention on nine key LHCS operational components: Data and Analytics; People and Partnerships; Patient and Family Engagement; Ethics and Oversight; Evaluation and Methodology; Funding; Organization; Prioritization; and Deliverables. Definitions, key elements and examples for each are presented. The framework is purposefully broad for application across different organizational contexts. Conclusion: A realistic assessment of the culture, resources and capabilities of the organization related to learning is critical to defining the scope of operationalization. Engaging patients in clinical care and discovery, including quality improvement and comparative effectiveness research, requires a defensible ethical framework that undergirds a system of strong but flexible oversight. Leadership support is imperative for advancement of the LHCS model. Findings from our ongoing work within the proposed framework may inform other organizations considering a transition to an LHCS. PMID:25992388

  12. Integration of family planning with national health services. Integration de la planification familiale aux services nationaux de sante.

    PubMed

    Mandara, N

    1984-09-01

    After independence in the 1960s, most African government inherited health structures that were curative oriented, costly, and directed toward the urban population. Primary health care, oriented toward prevention, promotion, improvement of the environment, cure, and rehabilitation, has since been adopteed as a better approach to health in Africa. This approach aims to integrate health care with thee activities of other seectors and places relicance on available community resources. An unexpected change has been the transformation of social and political attitudes toward family planning as a basic human right, a concomitant to heealth, and an integral part of socioeconomic development. Family planning is gradually being integrated into the maternal and child health services of all countries in Sub-Saharan Africa. In some cases, the government has assumed service delivery responsibilities previously carried out by family planning associations, thereby changing the association's role to that of education and motivation. Other countries have faced duplication of services and wastage of resources as a result of integration. There is a need for an overall evaluation of the integrated family planning-maternal and child heath services to determine future priorities and strategies. Problems so far encountered have included coverage, acceptability, accessibility, quality and continuity of care, data collection, and limited resources. However, cost factors, the shortage of trained manpower, the lack of facilities, and prevailing cultural and religious attitudes suggest the advisibility of integrated rather than vertical health programs in Africa. For both planning and administrative purposes, it is necessary to have a central Maternal and Child Health-Family Planning unit within the Ministry of Health as well as regional and district units.

  13. Integration of Hierarchical Goal Network Planning and Autonomous Path Planning

    DTIC Science & Technology

    2016-03-01

    Conference on Robotics and Automation (ICRA); 2010 May 3– 7; Anchorage, AK. p. 2902–2908. 4. Ayan NF, Kuter U, Yaman F, Goldman RP. Hotride...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES 14. ABSTRACT Automated planning has...world robotic systems. This report documents work to integrate a hierarchical goal network planning algorithm with low-level path planning. The system

  14. Western U.S.-Canada crossborder case study : activity 2 : task D : conduct regional and local trucking case studies

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Technical Capability Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM proje...

  15. Effective Language for Communicating Children's Issues.

    ERIC Educational Resources Information Center

    Coalition for America's Children, Washington, DC.

    Maintaining that only by integrating communications into program planning and policy can Kids Count grantees and other child advocates achieve their goals, this document presents four studies examining the ways in which the media currently frame children's issues, the consequences of those frames, and possibilities for reframing media depictions…

  16. IPM for Pennsylvania Schools: A How-To Manual.

    ERIC Educational Resources Information Center

    Martz, Eston, Ed.

    This manual presents practical advice on planning and adopting an integrated pest management (IPM) program for Pennsylvania educational facilities. The manual covers how to implement a school IPM, school IPM operational information for the school administrator, and technical information for Pennsylvania schools concerning various pests found in…

  17. School-Community Relations.

    ERIC Educational Resources Information Center

    Fiore, Douglas J.

    This book presents and discusses the essential elements of a successful school-community-relations plan for all schools. The study of school-community relations, though an integral part of the graduate curriculum of most programs in educational administration, is sadly viewed by some as nonessential. School administrators must understand and deal…

  18. A qualitative assessment of the role of shippers and others in driver compliance with federal safety regulations

    DOT National Transportation Integrated Search

    2012-08-01

    This report presents the test plan for conducting the Decision Support System Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM pr...

  19. Integration of GCAM-USA into GLIMPSE: Update and demonstration

    EPA Science Inventory

    The purpose of this presentation is to (i) discuss changes made to the GCAM-USA model to more fully support long-term, coordinated environmental-climate-energy planning within the U.S., and (ii) demonstrate the graphical user interface that has been constructed to construct model...

  20. Population Education in Africa. English Version.

    ERIC Educational Resources Information Center

    Sankale-Semeteys, Eva, Ed.

    1985-01-01

    National conferences on population and development have recommended the integration of population issues into development planning by national governments. This book presents several ideas of practitioners in the field of population and family life education. Five articles in Part I focus on solutions to problems of introducing population…

  1. The NCAT process

    NASA Technical Reports Server (NTRS)

    Milburn, George

    1992-01-01

    The topics are presented in viewgraph form and include the following: National Center for Appropriate Technology (NCAT) history; technologies selection criteria; strategic plan status; implementation framework; forum composition; NCAT role as integrator; government/industry coordination; identification and selection process for demonstrations; criteria for demonstrations; criteria for non-selection; and future actions.

  2. The cell's view of animal body-plan evolution.

    PubMed

    Lyons, Deirdre C; Martindale, Mark Q; Srivastava, Mansi

    2014-10-01

    An adult animal's form is shaped by the collective behavior of cells during embryonic development. To understand the forces that drove the divergence of animal body-plans, evolutionary developmental biology has focused largely on studying genetic networks operating during development. However, it is less well understood how these networks modulate characteristics at the cellular level, such as the shape, polarity, or migration of cells. We organized the "Cell's view of animal body plan evolution" symposium for the 2014 The Society for Integrative and Comparative Biology meeting with the explicit goal of bringing together researchers studying the cell biology of embryonic development in diverse animal taxa. Using a broad range of established and emerging technologies, including live imaging, single-cell analysis, and mathematical modeling, symposium participants revealed mechanisms underlying cells' behavior, a few of which we highlight here. Shape, adhesion, and movements of cells can be modulated over the course of evolution to alter adult body-plans and a major theme explored during the symposium was the role of actomyosin in coordinating diverse behaviors of cells underlying morphogenesis in a myriad of contexts. Uncovering whether conserved or divergent genetic mechanisms guide the contractility of actomyosin in these systems will be crucial to understanding the evolution of the body-plans of animals from a cellular perspective. Many speakers presented research describing developmental phenomena in which cell division and tissue growth can control the form of the adult, and other presenters shared work on studying cell-fate specification, an important source of novelty in animal body-plans. Participants also presented studies of regeneration in annelids, flatworms, acoels, and cnidarians, and provided a unifying view of the regulation of cellular behavior during different life-history stages. Additionally, several presentations highlighted technological advances that glean mechanistic insights from new and emerging model systems, thereby providing the phylogenetic breadth so essential for studying animal evolution. Thus, we propose that an explicit study of cellular phenomena is now possible for a wide range of taxa, and that it will be highly informative for understanding the evolution of animal body-plans. © The Author 2014. Published by Oxford University Press on behalf of the Society for Integrative and Comparative Biology. All rights reserved. For permissions please email: journals.permissions@oup.com.

  3. Community assessment in a vertically integrated health care system.

    PubMed Central

    Plescia, M; Koontz, S; Laurent, S

    2001-01-01

    OBJECTIVES: In this report, the authors present a representative case of the implementation of community assessment and the subsequent application of findings by a large, vertically integrated health care system. METHODS: Geographic information systems technology was used to access and analyze secondary data for a geographically defined community. Primary data included a community survey and asset maps. RESULTS: In this case presentation, information has been collected on demographics, prevalent health problems, access to health care, citizens' perceptions, and community assets. The assessment has been used to plan services for a new health center and to engage community members in health promotion interventions. CONCLUSIONS: Geographically focused assessments help target specific community needs and promote community participation. This project provides a practical application for integrating aspects of medicine and public health. PMID:11344895

  4. A synthesis of the "state-of-the-practice for advancing planning and operations integration opportunities within transportation agencies".

    DOT National Transportation Integrated Search

    2014-12-01

    Linking Planning and Operations is vital to improving transportation decision-making and overall : efficiency of transportation systems management. This synthesis summarizes current state of : knowledge and practices in Planning and Operations Integr...

  5. Ready, Set, Integrate!

    ERIC Educational Resources Information Center

    McCombs, John

    2003-01-01

    Describes how the American Embassy School (AES) in New Delhi, India achieved school-wide technology integration. Discusses development of a new network; beginning to mentor; organizing the Technology Integration Plan (TIP) by software application; implementing the plan; assessing progress; and results, which overall, were positive. (AEF)

  6. Route planning in a four-dimensional environment

    NASA Technical Reports Server (NTRS)

    Slack, M. G.; Miller, D. P.

    1987-01-01

    Robots must be able to function in the real world. The real world involves processes and agents that move independently of the actions of the robot, sometimes in an unpredictable manner. A real-time integrated route planning and spatial representation system for planning routes through dynamic domains is presented. The system will find the safest most efficient route through space-time as described by a set of user defined evaluation functions. Because the route planning algorthims is highly parallel and can run on an SIMD machine in O(p) time (p is the length of a path), the system will find real-time paths through unpredictable domains when used in an incremental mode. Spatial representation, an SIMD algorithm for route planning in a dynamic domain, and results from an implementation on a traditional computer architecture are discussed.

  7. Six elements of integrated primary healthcare.

    PubMed

    Brown, Lynsey J; Oliver-Baxter, Jodie

    2016-03-01

    Integrated care has the potential to deliver efficiencies and improvements in patient experiences and health outcomes. Efforts towards integrated care, especially at the primary and community health levels, have increasingly been under focus, both nationally and internationally. In Australia, regional integration is a priority, and integration of care is a task for meso-level organisations such as Primary Health Networks (PHNs). This paper seeks to provide a list of elements and questions for consideration by organisations working across primary healthcare settings, looking to enact and improve the delivery of integrated care. Six elements that consistently emerged during the development of a series of rapid reviews on integrated primary healthcare in Australia are presented in this paper. The elements identified are context, governance and leadership, infrastructure, financing, engagement, and communication. They offer a starting point for reflection in the planning and practices of organisations in their drive for continuous improvements in integrated care.

  8. The Everglades Depth Estimation Network (EDEN) for Support of Ecological and Biological Assessments

    USGS Publications Warehouse

    Telis, Pamela A.

    2006-01-01

    The Everglades Depth Estimation Network (EDEN) is an integrated network of real-time water-level monitoring, ground-elevation modeling, and water-surface modeling that provides scientists and managers with current (1999-present), online water-depth information for the entire freshwater portion of the Greater Everglades. Presented on a 400-square-meter grid spacing, EDEN offers a consistent and documented dataset that can be used by scientists and managers to (1) guide large-scale field operations, (2) integrate hydrologic and ecological responses, and (3) support biological and ecological assessments that measure ecosystem responses to the implementation of the Comprehensive Everglades Restoration Plan.

  9. Perceptions and Use of Technology to Support Older Adults with Multimorbidity.

    PubMed

    Murphy, Emma; Doyle, Julie; Hannigan, Caoimhe; Smith, Suzanne; Kuiper, Janneke; Jacobs, An; Hoogerwerf, Evert-Jan; Desideri, Lorenzo; Fiordelmondo, Valentina; Maluccelli, Lorenza; Brady, Anne-Marie; Dinsmore, John

    2017-01-01

    Digital technologies hold great potential to improve and advance home based integrated care for older people living with multiple chronic health conditions. In this paper, we present the results of a user requirement study for a planned digital integrated care system, based on the experiences and needs of key stakeholders. We present rich, multi-stakeholder, qualitative data on the perceptions and use of technology among older people with multiple chronic health conditions and their key support actors. We have outlined our future work for the design of the system, which will involve continuous stakeholder engagement through a user-centred co-design method.

  10. The Land Use Planning Imperative: Applying Carbon Emissions Analyses

    NASA Astrophysics Data System (ADS)

    Bray, E. N.; Havens, G.

    2007-12-01

    Reversing global warming is the defining crisis of the 21st century and must be dealt with, in part, by reinventing the built environment. Current land use and planning frameworks are not aligned with scientific models which can aid in the reversal of carbon emissions at the local and regional scale. The disjunction between land use planning and the scientific methodologies for calculating the impacts of climate change beg for a stronger union between climate change science and land use planning. Buildings account for approximately 35 percent of the U.S. carbon emissions while the transportation sector accounts for approximately 27 percent (U.S. Department of Energy, Energy Information Administration, United States Environmental Protection Agency, 2007). To adopt energy efficiency measures and hence reduce carbon dioxide emissions at a site, city, or regional scale, land use planners and climate scientists must integrate their expertise to influence policy with precision and accuracy. Land use planners have influence over the design of the built environment in municipalities and institutions such as colleges and universities. In many ways, college and university campuses are microcosms of the land use patterns established historically; they demonstrate a lack of coordinated land use planning across the entire continent that is extremely dependent on the automobile and fossil fuels. Climate models predict that the average temperature at the Earth's surface could increase from 2.5 to 10.4ºF above 1990 levels by the end of this century (United States Environmental Protection Agency, 2007). Further, it is estimated that the country will have to construct an additional 213 billion square feet of built space by the year 2030 to accommodate the increasing population. Planning and design will dictate the degree to which land use change will exacerbate trends of global warming. It commands an integration of the methodology to calculate carbon emissions with the science which demonstrates the impact of those emissions. This session presents a new approach and methodology for integrating calculating carbon emissions and land use planning to increase the accessibility of carbon dioxide emissions data, transforming our conception of how the built environment can function in a more sustainable way. The emergence of the public and institutional interest in reducing carbon emissions advances the question of how climate science may be applied and translated for a public audience to develop effective, measurable carbon reduction strategies. Building on the growing momentum in the higher education sector in the United States, land use planners are grappling with the integration of carbon reduction and the transformation of the built environment, particularly at college campuses. A critical first step in reducing carbon emissions is to complete a greenhouse gas inventory. In recent years, universities have adopted challenges to become climate neutral through operations, buildings, and transportation. This session will present two case studies at universities of how land use planning integrates scientific data and suggested methodology from the IPCC, the Chicago Climate Exchange, the Kyoto Protocol, and various other climate action registries in order to demonstrate a university's contribution to global warming. By developing a methodology for calculating CO2 emissions, land use planning and climate science can collectively formulate strategies for a more sustainable future.

  11. System Integration and In Vivo Testing of a Robot for Ultrasound Guidance and Monitoring During Radiotherapy.

    PubMed

    Sen, Hasan Tutkun; Bell, Muyinatu A Lediju; Zhang, Yin; Ding, Kai; Boctor, Emad; Wong, John; Iordachita, Iulian; Kazanzides, Peter

    2017-07-01

    We are developing a cooperatively controlled robot system for image-guided radiation therapy (IGRT) in which a clinician and robot share control of a 3-D ultrasound (US) probe. IGRT involves two main steps: 1) planning/simulation and 2) treatment delivery. The goals of the system are to provide guidance for patient setup and real-time target monitoring during fractionated radiotherapy of soft tissue targets, especially in the upper abdomen. To compensate for soft tissue deformations created by the probe, we present a novel workflow where the robot holds the US probe on the patient during acquisition of the planning computerized tomography image, thereby ensuring that planning is performed on the deformed tissue. The robot system introduces constraints (virtual fixtures) to help to produce consistent soft tissue deformation between simulation and treatment days, based on the robot position, contact force, and reference US image recorded during simulation. This paper presents the system integration and the proposed clinical workflow, validated by an in vivo canine study. The results show that the virtual fixtures enable the clinician to deviate from the recorded position to better reproduce the reference US image, which correlates with more consistent soft tissue deformation and the possibility for more accurate patient setup and radiation delivery.

  12. Between Oais and Agile a Dynamic Data Management Approach

    NASA Astrophysics Data System (ADS)

    Bennett, V. L.; Conway, E. A.; Waterfall, A. M.; Pepler, S.

    2015-12-01

    In this paper we decribe an approach to the integration of existing archival activities which lies between compliance with the more rigid OAIS/TRAC standards and a more flexible "Agile" approach to the curation and preservation of Earth Observation data. We provide a high level overview of existing practice and discuss how these procedures can be extended and supported through the description of preservation state. The aim of which is to facilitate the dynamic controlled management of scientific data through its lifecycle. While processes are considered they are not statically defined but rather driven by human interactions in the form of risk management/review procedure that produce actionable plans, which are responsive to change. We then proceed by describing the feasibility testing of extended risk management and planning procedures which integrate current practices. This was done through the CEDA Archival Format Audit which inspected British Atmospheric Data Centre and NERC Earth Observation Data Centre Archival holdings. These holdings are extensive, comprising of around 2 Petabytes of data and 137 million individual files, which were analysed and characterised in terms of format, based risk. We are then able to present an overview of the format based risk burden faced by a large scale archive attempting to maintain the usability of heterogeneous environmental data sets We continue by presenting a dynamic data management information model and provide discussion of the following core model entities and their relationships: Aspirational entities, which include Data Entity definitions and their associated Preservation Objectives. Risk entities, which act as drivers for change within the data lifecycle. These include Acquisitional Risks, Technical Risks, Strategic Risks and External Risks Plan entities, which detail the actions to bring about change within an archive. These include Acquisition Plans, Preservation Plans and Monitoring plans which support responsive interactions with the community. The Result entities describe the outcomes of the plans. This includes Acquisitions. Mitigations and Accepted Risks. With risk acceptance permitting imperfect but functional solutions that can be realistically supported within an archives resource levels

  13. A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki

    NASA Technical Reports Server (NTRS)

    Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher

    2010-01-01

    The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.

  14. Aligning incentives in health care: physician practice and health system partnership.

    PubMed

    Levin, L Scott; Gustave, Lori

    2013-06-01

    The key to successfully aligning hospitals and physicians is financial integration and joint incentives for academic, quality, and clinical productivity. Many physician practices and health systems are moving toward closer integration, but mainly through consolidation and employment strategies. We describe a fully integrated physician and hospital relationship including an overview of an aligned funds flow process that affords the department support for clinical services and teaching, research, and administrative activity. We also describe a physician compensation model that provides incentive not only for increased clinical performance, but also quality and academic objectives. The content of this article was acquired through our own experience in managing the Department of Orthopaedic Surgery at the University of Pennsylvania Health System including the health system's funds flow process. Based on input from both health system leaders and the faculty, the department's compensation plan was totally redesigned to create a line-of-sight plan that credits clinical performance and academic productivity. Our model is multifactorial and provides sustainable support for the department and a compensation plan that is competitive within the local market and nationally. The health system's funds flow process has enhanced alignment of the faculty and hospitals by providing compensation for nonclinical time and assists the department's growth strategies by providing funding for new faculty and gain-sharing of improved hospital margin. The implementation of the compensation plan increased productivity by 8% in its first year with no additional resources. Academic productivity in that same year was arguably at or above any other year in the department's history in terms of accepted publications, national presentations, and research grants awarded. A model of complete integration between an academic department and a health system is achievable through a systematic process of mission-based support.

  15. Path planning and energy management of solar-powered unmanned ground vehicles

    NASA Astrophysics Data System (ADS)

    Kaplan, Adam

    Many of the applications pertinent to unmanned vehicles, such as environmental research and analysis, communications, and information-surveillance and reconnaissance, benefit from prolonged vehicle operation time. Conventional efforts to increase the operational time of electric-powered unmanned vehicles have traditionally focused on the design of energy-efficient components and the identification of energy efficient search patterns, while little attention has been paid to the vehicle's mission-level path plan and power management. This thesis explores the formulation and generation of integrated motion-plans and power-schedules for solar-panel equipped mobile robots operating under strict energy constraints, which cannot be effectively addressed through conventional motion planning algorithms. Transit problems are considered to design time-optimal paths using both Balkcom-Mason and Pseudo-Dubins curves. Additionally, a more complicated problem to generate mission plans for vehicles which must persistently travel between certain locations, similar to the traveling salesperson problem (TSP), is presented. A comparison between one of the common motion-planning algorithms and experimental results of the prescribed algorithms, made possible by use of a test environment and mobile robot designed and developed specifically for this research, are presented and discussed.

  16. Socorro ISD. Integrated Lesson Plans.

    ERIC Educational Resources Information Center

    East Texas State Univ., Commerce. Educational Development and Training Center.

    This packet contains 29 lesson plans for integrated academic and vocational education courses. Lesson plans for the following courses are included: algebra, health occupations education, English, biology, laboratory mathematics, and health care sciences. Some of the topics covered are as follows: statistics, vital signs, graphing, ethics, special…

  17. Mansfield ISD. Integrated Lesson Plans.

    ERIC Educational Resources Information Center

    East Texas State Univ., Commerce. Educational Development and Training Center.

    This packet contains 27 lesson plans for integrated academic and vocational education courses. Lesson plans for the following courses are included: horticulture, algebra, physical science, general mechanical repair, foods and nutrition, home economics, and microcomputer applications. Some of the topics covered are as follows: seed germination,…

  18. 49 CFR 244.9 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND... are not connected to the general railroad system of transportation. Safety Integration Plan means a...

  19. Capital planning for clinical integration.

    PubMed

    Grauman, Daniel M; Neff, Gerald; Johnson, Molly Martha

    2011-04-01

    When assessing the financial implications of a physician alignment and clinical integration initiative, a hospital should measure the initiative's potential ROI, perhaps best using a combination of net present value and payback period. The hospital should compare its own historical and projected performance with rating agency median benchmarks for key financial indicators of profitability, debt service, capital and cash flow, and liquidity. The hospital should also consider potential indirect benefits, such as retained outpatient/ancillary revenue, increased inpatient revenue, improved cost control, and improved quality and reporting transparency.

  20. Seven Processes that Enable NASA Software Engineering Technologies

    NASA Technical Reports Server (NTRS)

    Housch, Helen; Godfrey, Sally

    2011-01-01

    This slide presentation reviews seven processes that NASA uses to ensure that software is developed, acquired and maintained as specified in the NPR 7150.2A requirement. The requirement is to ensure that all software be appraised for the Capability Maturity Model Integration (CMMI). The enumerated processes are: (7) Product Integration, (6) Configuration Management, (5) Verification, (4) Software Assurance, (3) Measurement and Analysis, (2) Requirements Management and (1) Planning & Monitoring. Each of these is described and the group(s) that are responsible is described.

  1. Current science requirements and planned implementation for the WFIRST-CGI Integral Field Spectrograph (IFS)

    NASA Astrophysics Data System (ADS)

    Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.

    2017-09-01

    One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.

  2. Virtual Globes and Glacier Research: Integrating research, collaboration, logistics, data archival, and outreach into a single tool

    NASA Astrophysics Data System (ADS)

    Nolan, M.

    2006-12-01

    Virtual Globes are a paradigm shift in the way earth sciences are conducted. With these tools, nearly all aspects of earth science can be integrated from field science, to remote sensing, to remote collaborations, to logistical planning, to data archival/retrieval, to PDF paper retriebal, to education and outreach. Here we present an example of how VGs can be fully exploited for field sciences, using research at McCall Glacier, in Arctic Alaska.

  3. Integrated Hybrid System Architecture for Risk Analysis

    NASA Technical Reports Server (NTRS)

    Moynihan, Gary P.; Fonseca, Daniel J.; Ray, Paul S.

    2010-01-01

    A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.

  4. Current Science Requirements and Planned Implementation for the WFIRST-CGI Integral Field Spectrograph (IFS)

    NASA Technical Reports Server (NTRS)

    Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.

    2017-01-01

    One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI Instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.

  5. An Analysis of Current Operational Contract Support Planning Doctrine

    DTIC Science & Technology

    2015-09-01

    P). This project argues for the balanced development of OCS planning acquisition and non-acquisition focused resources to effectively integrate this...planning guidance developed is appropriate for initial entry operations applicable to various levels of theater maturity. 14. SUBJECT TERMS...balanced development of OCS planning acquisition and non- acquisition focused resources to effectively integrate this function across disciplines. The

  6. The Logic of Integrating Conventional and Nuclear Planning [Integration of conventional and nuclear: What does it mean?

    DOE PAGES

    Manzo, Vincent A.; Miles, Aaron R.

    2016-10-31

    In October 2015, Secretary of Defense Carter called for NATO to better integrate conventional and nuclear deterrence. Four months later, Assistant Secretary of Defense Robert Scher stated in Senate testimony that the DoD is "working to ensure an appropriate level of integration between nuclear and conventional planning and operations."

  7. Creating a future worth experiencing: nursing strategic planning in an integrated healthcare delivery system.

    PubMed

    Drenkard, K N

    2001-01-01

    The application of a strategic planning methodology for the discipline of nursing is described in use by a large, nonprofit integrated healthcare system. The methodology uses a transformational leadership assessment tool, quality planning methods, and large group intervention to engage nurses in the implementation of strategies. Based on systems theory, the methodology outlined by the author has application at any level in an organization, from an entire delivery network, to a patient care unit. The author discusses getting started on a strategic planning journey, tools that are useful in the process, integrating already existing business plans into the strategies for nursing, preliminary measures to monitor progress, and lessons learned along the journey.

  8. A Prospectus for the Future Development of a Speech Lab: Hypertext Applications.

    ERIC Educational Resources Information Center

    Berube, David M.

    This paper presents a plan for the next generation of speech laboratories which integrates technologies of modern communication in order to improve and modernize the instructional process. The paper first examines the application of intermediate technologies including audio-video recording and playback, computer assisted instruction and testing…

  9. NASA space research and technology overview (ITP)

    NASA Technical Reports Server (NTRS)

    Reck, Gregory M.

    1992-01-01

    A series of viewgraphs summarizing NASA space research and technology is presented. Some of the specific topics covered include the organization and goals of the Office of Aeronautics and Space Technology, technology maturation strategy, integrated technology plan for the Civil Space Program, program selection and investment prioritization, and space technology benefits.

  10. Strategic directions and mechanisms in technology transfer

    NASA Technical Reports Server (NTRS)

    Mackin, Robert

    1992-01-01

    An outline summarizing the Working Panel discussion related to strategic directions for technology transfer is presented. Specific topics addressed include measuring success, management of technology, innovation and experimentation in the tech transfer process, integration of tech transfer into R&D planning, institutionalization of tech transfer, and policy/legislative resources.

  11. Advanced Education and Technology Business Plan, 2010-13. Highlights

    ERIC Educational Resources Information Center

    Alberta Advanced Education and Technology, 2010

    2010-01-01

    The Ministry of Advanced Education and Technology envisions Alberta's prosperity through innovation and lifelong learning. Advanced Education and Technology's mission is to lead the development of a knowledge-driven future through a dynamic and integrated advanced learning and innovation system. This paper presents the highlights of the business…

  12. Management Education and the Liberal Arts at Babson College.

    ERIC Educational Resources Information Center

    Handler, Edward; Sorenson, Ralph Z.

    1979-01-01

    The experience of Babson College of integrating liberal arts into a school of management program is presented through three phases of development culminating with a second master plan formulated in 1975. The liberal arts are seen as making a vital contribution to a broad preparation for managerial responsibility. (JMF)

  13. Utilizing Virtual and Personal Learning Environments for Optimal Learning

    ERIC Educational Resources Information Center

    Terry, Krista, Ed.; Cheney, Amy, Ed.

    2016-01-01

    The integration of emerging technologies in higher education presents a new set of challenges and opportunities for educators. With a growing need for customized lesson plans in online education, educators are rethinking the design and development of their learning environments. "Utilizing Virtual and Personal Learning Environments for…

  14. CD-ROM Integration Peaks Student Interest in Inquiry.

    ERIC Educational Resources Information Center

    O'Bannon, Blanche

    1997-01-01

    Discussion of learning processes examines past educational practices and considers how CD-ROM technology can impact teaching and learning. A lesson plan for elementary school science that uses a CD-ROM encyclopedia is presented that includes instructional goals, performance objectives, teaching and learning activities, and assessment methods.…

  15. Campus Computing Strategies.

    ERIC Educational Resources Information Center

    McCredie, John W., Ed.

    Ten case studies that describe the planning process and strategies employed by colleges who use computing and communication systems are presented, based on a 1981-1982 study conducted by EDUCOM. An introduction by John W. McCredie summarizes several current and future effects of the rapid spread and integration of computing and communication…

  16. Preservation Concerns in Construction and Remodeling of Libraries: Planning for Preservation.

    ERIC Educational Resources Information Center

    Trinkley, Michael

    To help libraries and other holdings institutions better incorporate preservation concerns in construction, renovation, and routine maintenance, various techniques are presented that allow preservation concerns to be integrated. The following topics are considered: (1) site selection; (2) design of the building envelope; (3) the library interior;…

  17. Exploring Literature through Films. Project ELF.

    ERIC Educational Resources Information Center

    Los Angeles County Office of Education, Downey, CA.

    Noting that instructional films can serve as a valuable tool to motivate students and to help them organize, interpret, and evaluate concepts presented, this program guide is designed to assist teachers in planning instructional activities that will effectively integrate films into the English language arts curriculum. The first section of the…

  18. Renaissance Art, Education, and History: An Art Historian's Perspective.

    ERIC Educational Resources Information Center

    Steele, Brian D.

    1993-01-01

    Contends lack of appropriate instructional materials and demands of studio art production may keep some teachers from incorporating art history and art appreciation into secondary art education courses. Presents two lesson plans focusing on art from European Renaissance period. Concludes that the integration of art history, criticism, and…

  19. Release the Prisoners Game

    ERIC Educational Resources Information Center

    Van Hecke, Tanja

    2011-01-01

    This article presents the mathematical approach of the optimal strategy to win the "Release the prisoners" game and the integration of this analysis in a math class. Outline lesson plans at three different levels are given, where simulations are suggested as well as theoretical findings about the probability distribution function and its mean…

  20. Juneau Indian Studies Elementary Curriculum Guide. Grades K-5.

    ERIC Educational Resources Information Center

    Cadiente, Ronalda

    Designed to provide instruction in Tlingit culture as an integral part of the K-5 social studies curriculum, this guide presents teachers with extensive lesson plans and numerous resource materials. The units of study focus on the culture and environment of southeast Alaska and emphasize experiential learning activities. Each grade…

  1. Rethinking Mathematics: Teaching Social Justice by the Numbers

    ERIC Educational Resources Information Center

    Gutstein, Eric, Ed.; Peterson, Bob, Ed.

    2005-01-01

    This unique collection of more than 30 articles shows teachers how to weave social-justice principles throughout the math curriculum, and how to integrate social-justice math into other curricular areas as well. "Rethinking Mathematics" presents teaching ideas, lesson plans and reflections by practicing classroom teachers and distinguished…

  2. Fuels planning: science synthesis and integration; social issues fact sheet 12: Keys to successful collaboration

    Treesearch

    Christine Esposito

    2006-01-01

    Collaborating on fire and fuels management with a host of public and private partners may seem like an impossible undertaking, and presents many challenges. This fact sheet reviews tips for what to focus on as you embark on a collaborative fuels management project.Other...

  3. Electronic Document Management Systems: Where Are They Today?

    ERIC Educational Resources Information Center

    Koulopoulos, Thomas M.; Frappaolo, Carl

    1993-01-01

    Discusses developments in document management systems based on a survey of over 400 corporations and government agencies. Text retrieval and imaging markets, architecture and integration, purchasing plans, and vendor market leaders are covered. Five graphs present data on user preferences for improvements. A sidebar article reviews the development…

  4. Measuring research progress in photovoltaics

    NASA Technical Reports Server (NTRS)

    Jackson, B.; Mcguire, P.

    1986-01-01

    The role and some results of the project analysis and integration function in the Flat-plate Solar Array (FSA) Project are presented. Activities included supporting the decision-making process, preparation of plans for project direction, setting goals for project activities, measuring progress within the project, and the development and maintenance of analytical models.

  5. 32 CFR 651.14 - Integration with Army planning.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... be controversial. In most cases, local citizens and/or existing advisory groups should assist in... reduce or eliminate discussion of minor issues to help focus analyses. Such an approach will minimize... recommendations presented in the CEQ publication entitled “The National Environmental Policy Act: A Study of Its...

  6. 32 CFR 651.14 - Integration with Army planning.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be controversial. In most cases, local citizens and/or existing advisory groups should assist in... reduce or eliminate discussion of minor issues to help focus analyses. Such an approach will minimize... recommendations presented in the CEQ publication entitled “The National Environmental Policy Act: A Study of Its...

  7. 32 CFR 651.14 - Integration with Army planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be controversial. In most cases, local citizens and/or existing advisory groups should assist in... reduce or eliminate discussion of minor issues to help focus analyses. Such an approach will minimize... recommendations presented in the CEQ publication entitled “The National Environmental Policy Act: A Study of Its...

  8. 32 CFR 651.14 - Integration with Army planning.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... be controversial. In most cases, local citizens and/or existing advisory groups should assist in... reduce or eliminate discussion of minor issues to help focus analyses. Such an approach will minimize... recommendations presented in the CEQ publication entitled “The National Environmental Policy Act: A Study of Its...

  9. 32 CFR 651.14 - Integration with Army planning.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... be controversial. In most cases, local citizens and/or existing advisory groups should assist in... reduce or eliminate discussion of minor issues to help focus analyses. Such an approach will minimize... recommendations presented in the CEQ publication entitled “The National Environmental Policy Act: A Study of Its...

  10. Outcomes Assessment of Computer-Assisted Behavioral Objectives for Accounting Graduates.

    ERIC Educational Resources Information Center

    Moore, John W.; Mitchem, Cheryl E.

    1997-01-01

    Presents behavioral objectives for accounting students and an outcomes assessment plan with five steps: (1) identification and definition of student competencies; (2) selection of valid instruments; (3) integration of assessment and instruction; (4) determination of levels of assessment; and (5) attribution of improvements to the program. (SK)

  11. Integrating Endowment and Budget Planning. AGB Occasional Paper No. 24.

    ERIC Educational Resources Information Center

    Curzan, Myron P.; Katz, Louis H.

    1994-01-01

    This monograph presents recommendations for college and university trustees regarding endowment spending policies. The recommendations include how to set investment goals, assess the reasonableness of investments, and judge when to use endowment funds for high priority needs. A systematic method for determining how much to spend annually from…

  12. Integrated mineral-resource and mineral-environmental assessments of public lands: Applications for land management and resource planning

    USGS Publications Warehouse

    Plumlee, Geoffrey S.; Smith, Steven M.; Toth, Margo I.; Marsh, Sherman P.; Ludington, S.D.; Wallace, A.R.; Ficklin, W.H.; Smith, K.S.; Nash, J.T.; Foley, N.K.; Van Loenen, R. E.; Berger, B.R.; Green, G.

    1993-01-01

    This report presents prototype mineralenvironmental assessments of the State of Colorado and the San Juan National Forest. The following pages will show examples of how geologic information can be used to help predict and prevent adverse environmental effects of mineralresource development.

  13. Teaching about Human Rights and American Indians.

    ERIC Educational Resources Information Center

    Harvey, Karen D.

    1996-01-01

    Presents a flexible lesson plan integrating teaching about human rights into the existing curriculum about American Indians. Asserts that American Indians have the right to maintain their cultural ways and connects that subject to the United Nations Universal Declaration of Human Rights. Includes three lists of resources and references. (MJP)

  14. A Supplementary Program for Environmental Education, Music, High School.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in this teacher's guide for grades 10-12 are lesson plans and ideas for integrating music and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral objectives and suggested…

  15. A Supplementary Program for Environmental Education, Art, Grade 7-9.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in this teacher's guide for grades seven through nine are lesson plans and ideas for integrating art and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral objectives and…

  16. A Supplementary Program for Environmental Education, Art, Grade 10-12.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in this teacher's guide for grades 10-12 are lesson plans and ideas for integrating art (drawing, painting, graphics, photography, and commercial art) and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem…

  17. A Supplementary Program for Environmental Education, Music, Grade 7-9.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in this teacher's guide for grades seven through nine are lesson plans and ideas for integrating music and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral objectives and…

  18. A Supplementary Program for Environmental Education, Mathematics, Grade 5-6.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in these teacher's guides for grades five and six are lesson plans and ideas for integrating mathematics and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral objectives…

  19. A Supplementary Program for Environmental Education, Art, Grade 4-6.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in this teacher's guide for grades four through six are lesson plans and ideas for integrating art and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral objectives and…

  20. A Supplementary Program for Environmental Education, Mathematics, Grade 2-4.

    ERIC Educational Resources Information Center

    Warpinski, Robert

    Presented in these teacher's guides for grades two through four are lesson plans and ideas for integrating mathematics and environmental education. Each lesson originates with a fundamental concept pertaining to the environment and states, in addition, its discipline area, subject area, and problem orientation. Following this, behavioral…

Top