NASA Technical Reports Server (NTRS)
Lofton, Rodney
2010-01-01
This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.
49 CFR 1106.3 - Actions for which Safety Integration Plan is required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Actions for which Safety Integration Plan is... TRANSPORTATION BOARD CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.3 Actions for which Safety Integration Plan is required. A SIP...
48 CFR 806.570 - Planning requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Planning requirements. 806... AND ACQUISITION PLANNING COMPETITION REQUIREMENTS Competition Advocates 806.570 Planning requirements... planning that is required. (3) A description of how to integrate the Competition Plan into advance...
Grid Integration Studies: Advancing Clean Energy Planning and Deployment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Katz, Jessica; Chernyakhovskiy, Ilya
2016-07-01
Integrating significant variable renewable energy (VRE) into the grid requires an evolution in power system planning and operation. To plan for this evolution, power system stakeholders can undertake grid integration studies. This Greening the Grid document reviews grid integration studies, common elements, questions, and guidance for system planners.
Integrating fire management analysis into land management planning
Thomas J. Mills
1983-01-01
The analysis of alternative fire management programs should be integrated into the land and resource management planning process, but a single fire management analysis model cannot meet all planning needs. Therefore, a set of simulation models that are analytically separate from integrated land management planning models are required. The design of four levels of fire...
1983-08-01
AD- R136 99 THE INTEGRATED MISSION-PLNNING STATION: FUNCTIONAL 1/3 REQUIREMENTS AVIATOR-..(U) RNACAPR SCIENCES INC SANTA BARBARA CA S P ROGERS RUG...Continue on reverse side o necess.ar and identify by btock number) Interactive Systems Aviation Control-Display Functional Require- Plan-Computer...Dialogue Avionics Systems ments Map Display Army Aviation Design Criteria Helicopters M4ission Planning Cartography Digital Map Human Factors Navigation
Code of Federal Regulations, 2010 CFR
2010-04-01
... benefits under the plan on account of such integration. See also subsections (a)(5), (a)(15), and (d)(6) of...) for a special prohibition against integration. (c) Application of nondiscrimination requirement. (1...)(6) and all other integration requirements applicable to qualified defined contribution plans. The...
NASA Technical Reports Server (NTRS)
Sapp, T. P.; Davin, D. E.
1977-01-01
The integrated payload and mission planning process for STS payloads was defined, and discrete tasks which evaluate performance and support initial implementation of this process were conducted. The scope of activity was limited to NASA and NASA-related payload missions only. The integrated payload and mission planning process was defined in detail, including all related interfaces and scheduling requirements. Related to the payload mission planning process, a methodology for assessing early Spacelab mission manager assignment schedules was defined.
Federated Search Tools in Fusion Centers: Bridging Databases in the Information Sharing Environment
2012-09-01
considerable variation in how fusion centers plan for, gather requirements, select and acquire federated search tools to bridge disparate databases...centers, when considering integrating federated search tools; by evaluating the importance of the planning, requirements gathering, selection and...acquisition processes for integrating federated search tools; by acknowledging the challenges faced by some fusion centers during these integration processes
Computer-aided resource planning and scheduling for radiological services
NASA Astrophysics Data System (ADS)
Garcia, Hong-Mei C.; Yun, David Y.; Ge, Yiqun; Khan, Javed I.
1996-05-01
There exists tremendous opportunity in hospital-wide resource optimization based on system integration. This paper defines the resource planning and scheduling requirements integral to PACS, RIS and HIS integration. An multi-site case study is conducted to define the requirements. A well-tested planning and scheduling methodology, called Constrained Resource Planning model, has been applied to the chosen problem of radiological service optimization. This investigation focuses on resource optimization issues for minimizing the turnaround time to increase clinical efficiency and customer satisfaction, particularly in cases where the scheduling of multiple exams are required for a patient. How best to combine the information system efficiency and human intelligence in improving radiological services is described. Finally, an architecture for interfacing a computer-aided resource planning and scheduling tool with the existing PACS, HIS and RIS implementation is presented.
10 CFR 905.15 - What are the requirements for the small customer plan alternative?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...
10 CFR 905.15 - What are the requirements for the small customer plan alternative?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...
10 CFR 905.15 - What are the requirements for the small customer plan alternative?
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false What are the requirements for the small customer plan alternative? 905.15 Section 905.15 Energy DEPARTMENT OF ENERGY ENERGY PLANNING AND MANAGEMENT PROGRAM Integrated Resource Planning § 905.15 What are the requirements for the small customer plan alternative? (a...
40 CFR 264.52 - Content of contingency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... waste management provisions that are sufficient to comply with the requirements of this part. The owner... that the plan be based on the National Response Team's Integrated Contingency Plan Guidance (“One Plan”). When modifications are made to non-RCRA provisions in an integrated contingency plan, the changes do...
49 CFR 244.1 - Scope, application, and purpose.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD... part prescribes requirements for filing and implementing a Safety Integration Plan with FRA whenever a...
1984-06-29
sheet metal, machined and composite parts and assembling the components into final pruJucts o Planning, evaluating, testing, inspecting and...Research showed that current programs were pursuing the design and demonstration of integrated centers for sheet metal, machining and composite ...determine any metal parts required and to schedule these requirements from the machining center. Figure 3-33, Planned Composite Production, shows
ERIC Educational Resources Information Center
Kersaint, Gladis
2007-01-01
This article describes a technology integration course planning assignment that was developed to enhance preservice teachers' technological pedagogical content knowledge (TPCK). This assignment required preservice teachers work with peers to integrate various technological tools (e.g., graphing calculators, web-based mathematics applets, etc) in a…
26 CFR 54.4975-11 - “ESOP” requirements.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., 1977. (4) Retroactive amendment. A plan meets the requirements of this section as of the date that it is designated as an ESOP if it is amended retroactively to meet, and in fact does meet, such... such date may remain integrated. However, such plans must not be amended to increase the integration...
26 CFR 54.4975-11 - “ESOP” requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., 1977. (4) Retroactive amendment. A plan meets the requirements of this section as of the date that it is designated as an ESOP if it is amended retroactively to meet, and in fact does meet, such... such date may remain integrated. However, such plans must not be amended to increase the integration...
26 CFR 54.4975-11 - “ESOP” requirements.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., 1977. (4) Retroactive amendment. A plan meets the requirements of this section as of the date that it is designated as an ESOP if it is amended retroactively to meet, and in fact does meet, such... such date may remain integrated. However, such plans must not be amended to increase the integration...
26 CFR 54.4975-11 - “ESOP” requirements.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., 1977. (4) Retroactive amendment. A plan meets the requirements of this section as of the date that it is designated as an ESOP if it is amended retroactively to meet, and in fact does meet, such... such date may remain integrated. However, such plans must not be amended to increase the integration...
The MAP program: building the digital terrain model.
R.H. Twito; R.W. Mifflin; R.J. McGaughey
1987-01-01
PLANS, a software package for integrated timber-harvest planning, uses digital terrain models to provide the topographic data needed to fit harvest and transportation designs to specific terrain. MAP, an integral program in the PLANS package, is used to construct the digital terrain models required by PLANS. MAP establishes digital terrain models using digitizer-traced...
World Cup 2010 planning: an integration of public health and medical systems.
Yancey, Arthur H; Fuhri, Peter D; Pillay, Yogan; Greenwald, Ian
2008-10-01
To present crucial stages of planning and the resources involved in the medical and health care that will address issues affecting the health and safety of all participants in the 2010 World Cup. Relevant literature reviews of mass gathering medical care supplemented experience of the authors in planning for previous similar events. Attention is focused on issues wherein effective planning requires the integration of public health practices with those of clinical emergency medical services. The tables that are included serve to illustrate the depth and breadth of planning as well as the organizational relationships required to execute care of a universally acceptable standard. This article offers guidance in planning for the 2010 World Cup health and emergency medical care, emphasizing the need for integration of public health and medical practices. It depicts the span of planning envisioned, the organizational relationships crucial to it, and emphasizes the necessity of an early start.
Data management and processing plan, Department of Applied Geodesy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-08-01
This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL.
A Collaborative Web-Based Approach to Planning Research, Integration, and Testing Using a Wiki
NASA Technical Reports Server (NTRS)
Delaney, Michael M.; Koshimoto, Edwin T.; Noble, Deleena; Duggan, Christopher
2010-01-01
The National Aeronautics and Space Administration Integrated Vehicle Health Management program touches on many different research areas while striving to enable the automated detection, diagnosis, prognosis, and mitigation of adverse events at the aircraft and system level. At the system level, the research focus is on the evaluation of multidisciplinary integrated methods, tools, and technologies for achieving the program goal. The participating program members form a diverse group of government, industry, and academic researchers. The program team developed the Research and Test Integration Plan in order to track significant test and evaluation activities, which are important for understanding, demonstrating, and communicating the overall project state and project direction. The Plan is a living document, which allows the project team the flexibility to construct conceptual test scenarios and to track project resources. The Plan also incorporates several desirable feature requirements for Plan users and maintainers. A wiki has proven to be the most efficient and effective means of implementing the feature requirements for the Plan. The wiki has proven very valuable as a research project management tool, and there are plans to expand its scope.
75 FR 81710 - Proposed Agency Information Collection Activities; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
... clearance by OMB as required by the PRA. Title: Safety Integration Plans. OMB Control Number: 2130-0557... for the development and implementation of safety integration plans (``SIPs'' or ``plans'') by a Class... affected railroads (Class Is and some Class IIs) address critical safety issues unique to the amalgamation...
2008-09-26
Section 1936 of the Social Security Act (the Act) (as added by section 6034 of the Deficit Reduction Act of 2005 (DRA) established the Medicaid Integrity Program to promote the integrity of the Medicaid program by requiring CMS to enter into contracts with eligible entities to: (1) Review the actions of individuals or entities furnishing items or services (whether on a fee-for-service, risk, or other basis) for which payment may be made under an approved State plan and/or any waiver of such plan approved under section 1115 of the Act; (2) audit claims for payment of items or services furnished, or administrative services rendered, under a State plan; (3) identify overpayments to individuals or entities receiving Federal funds; and (4) educate providers of services, managed care entities, beneficiaries, and other individuals with respect to payment integrity and quality of care. This final rule will provide requirements for an eligible entity to enter into a contract under the Medicaid integrity audit program. The final rule will also establish the contracting requirements for eligible entities. The requirements will include procedures for identifying, evaluating, and resolving organizational conflicts of interest that are generally applicable to Federal acquisition and procurement; competitive procedures to be used; and procedures under which a contract may be renewed.
NASA Technical Reports Server (NTRS)
Palguta, T.; Bradley, W.; Stockton, T.
1988-01-01
Guidance in preparing and updating an integrated logistics support plan (ILSP) is given. Clear, concise, and detailed instructions are provided on the preparation and content of an ILSP in order to ensure a quality document that reflects total program requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ganapin, D.J. Jr.
1987-01-01
Integrated environmental planning was analyzed using the case of the Palawan Integrated Environmental Program in the Philippines. The study explores the relationship between development and environmental planning and evaluates the importance of organizational coordination and timing in the integration of these two concerns. Factors affecting the accomplishment of the objectives of integrated environmental planning were also studied. Two planning phases of the Palawan Integrated Environmental Program were observed using the case study approach. Observations of various planning participants-consultants, middle level agency personnel, heads of local agencies-were also considered. The integration of environmental considerations in development planning was found to bemore » beneficial to both environmental and development concerns. The experience showed that such integration requiring tight organizational coordination and the proper timing of activities and outputs. The success of the Palawan Integrated Environmental Program was also found to depend on effective communication, the political functionality of the government, the leadership of its executives, the presence of appropriate structures of authority, sufficiency of funds and manpower and the availability of appropriate environmental planning techniques. Recommendations are provided to further strengthen the integration of environmental considerations in development planning and increase the effectiveness of integrated environmental programs.« less
Space shuttle program: Shuttle Avionics Integration Laboratory. Volume 7: Logistics management plan
NASA Technical Reports Server (NTRS)
1974-01-01
The logistics management plan for the shuttle avionics integration laboratory defines the organization, disciplines, and methodology for managing and controlling logistics support. Those elements requiring management include maintainability and reliability, maintenance planning, support and test equipment, supply support, transportation and handling, technical data, facilities, personnel and training, funding, and management data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marutzky, Sam; Farnham, Irene
The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collectionmore » and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.« less
Executing on Integration: The Key to Success in Mergers and Acquisitions.
Bradley, Carol
2016-01-01
Health care mergers and acquisitions require a clearly stated vision and exquisite planning of integration activities to provide the best possible conditions for a successful transaction. During the due diligence process, key steps can be taken to create a shared vision and a plan to inspire confidence and build enthusiasm for all stakeholders. Integration planning should include a defined structure, roles and responsibilities, as well as a method for evaluation.
Data Requirement (DR) MA-03: Payload missions integration. [Spacelab payloads
NASA Technical Reports Server (NTRS)
1985-01-01
Project management and payload integration requirements definition activities are reported. Mission peculiar equipment; systems integration; ground operations analysis and requirement definition; safety and quality assurance; and support systems development are examined for payloads planned for the following missions: EOM-1; SL-2; Sl-3 Astro-1; MSL-2; EASE/ACCESS; MPESS; and the middeck ADSF flight.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kulvatunyou, Boonserm; Wysk, Richard A.; Cho, Hyunbo
2004-06-01
In today's global manufacturing environment, manufacturing functions are distributed as never before. Design, engineering, fabrication, and assembly of new products are done routinely in many different enterprises scattered around the world. Successful business transactions require the sharing of design and engineering data on an unprecedented scale. This paper describes a framework that facilitates the collaboration of engineering tasks, particularly process planning and analysis, to support such globalized manufacturing activities. The information models of data and the software components that integrate those information models are described. The integration framework uses an Integrated Product and Process Data (IPPD) representation called a Resourcemore » Independent Operation Summary (RIOS) to facilitate the communication of business and manufacturing requirements. Hierarchical process modeling, process planning decomposition and an augmented AND/OR directed graph are used in this representation. The Resource Specific Process Planning (RSPP) module assigns required equipment and tools, selects process parameters, and determines manufacturing costs based on two-level hierarchical RIOS data. The shop floor knowledge (resource and process knowledge) and a hybrid approach (heuristic and linear programming) to linearize the AND/OR graph provide the basis for the planning. Finally, a prototype system is developed and demonstrated with an exemplary part. Java and XML (Extensible Markup Language) are used to ensure software and information portability.« less
NASA Technical Reports Server (NTRS)
Fay, M.
1998-01-01
This Contamination Control Plan is submitted in response the Contract Document requirements List (CDRL) 007 under contract NAS5-32314 for the Earth Observing System (EOS) Advanced Microwave Sounding Unit A (AMSU-A). In response to the CDRL instructions, this document defines the level of cleanliness and methods/procedures to be followed to achieve adequate cleanliness/contamination control, and defines the required approach to maintain cleanliness/contamination control through shipping, observatory integration, test, and flight. This plan is also applicable to the Meteorological Satellite (METSAT) except where requirements are identified as EOS-specific. This plan is based on two key factors: a. The EOS/METSAT AMSU-A Instruments are not highly contamination sensitive. b. Potential contamination of other EOS Instruments is a key concern as addressed in Section 9/0 of the Performance Assurance Requirements for EOS/METSAT Integrated Programs AMSU-A Instrument (MR) (NASA Specification S-480-79).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).
Artificial intelligence techniques for scheduling Space Shuttle missions
NASA Technical Reports Server (NTRS)
Henke, Andrea L.; Stottler, Richard H.
1994-01-01
Planning and scheduling of NASA Space Shuttle missions is a complex, labor-intensive process requiring the expertise of experienced mission planners. We have developed a planning and scheduling system using combinations of artificial intelligence knowledge representations and planning techniques to capture mission planning knowledge and automate the multi-mission planning process. Our integrated object oriented and rule-based approach reduces planning time by orders of magnitude and provides planners with the flexibility to easily modify planning knowledge and constraints without requiring programming expertise.
Analysis and integration of spatial data for transportation planning.
DOT National Transportation Integrated Search
2009-06-01
Transportation planning requires substantial amounts of data and cooperation among transportation planning : agencies. Advances in computer technology and the increasing availability of geographic information : systems (GIS) are giving transportation...
45 CFR 225.2 - State plan requirements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... personnel of which subprofessional staff are an integral part; (3) A career service plan permitting persons... planning capacities and service provision; (3) A program for organized training and supervision of such...
45 CFR 225.2 - State plan requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... personnel of which subprofessional staff are an integral part; (3) A career service plan permitting persons... planning capacities and service provision; (3) A program for organized training and supervision of such...
45 CFR 225.2 - State plan requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... personnel of which subprofessional staff are an integral part; (3) A career service plan permitting persons... planning capacities and service provision; (3) A program for organized training and supervision of such...
Collins, Sarah A.; Gazarian, Priscilla; Stade, Diana; McNally, Kelly; Morrison, Conny; Ohashi, Kumiko; Lehmann, Lisa; Dalal, Anuj; Bates, David W.; Dykes, Patricia C.
2014-01-01
Patient- and Family-Centered Care (PFCC) is essential for high quality care in the critical and acute-specialty care hospital setting. Effective PFCC requires clinicians to form an integrated interprofessional team to collaboratively engage with the patient/family and contribute to a shared patient-centered plan of care. We conducted observations on a critical care and specialty unit to understand the plan of care activities and workflow documentation requirements for nurses and physicians to inform the development of a shared patient-centered plan of care to support patient engagement. We identified siloed plan of care documentation, with workflow opportunities to converge the nurses plan of care with the physician planned To-do lists and quality and safety checklists. Integration of nurses and physicians plan of care activities into a shared plan of care is a feasible and valuable step toward interprofessional teams that effectively engage patients in plan of care activities. PMID:25954345
Space station systems technology study (add-on task). Volume 3: Technology advancement program plan
NASA Technical Reports Server (NTRS)
1985-01-01
Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.
NASA Technical Reports Server (NTRS)
Howard, R. A.; North, D. W.; Pezier, J. P.
1975-01-01
A new methodology is proposed for integrating planetary quarantine objectives into space exploration planning. This methodology is designed to remedy the major weaknesses inherent in the current formulation of planetary quarantine requirements. Application of the methodology is illustrated by a tutorial analysis of a proposed Jupiter Orbiter mission. The proposed methodology reformulates planetary quarantine planning as a sequential decision problem. Rather than concentrating on a nominal plan, all decision alternatives and possible consequences are laid out in a decision tree. Probabilities and values are associated with the outcomes, including the outcome of contamination. The process of allocating probabilities, which could not be made perfectly unambiguous and systematic, is replaced by decomposition and optimization techniques based on principles of dynamic programming. Thus, the new methodology provides logical integration of all available information and allows selection of the best strategy consistent with quarantine and other space exploration goals.
Life science payloads planning study integration facility survey results
NASA Technical Reports Server (NTRS)
Wells, G. W.; Brown, N. E.; Nelson, W. G.
1976-01-01
The integration facility survey effort described is structured to examine the facility resources needed to conduct life science payload (LSP) integration checkout activities at NASA-JSC. The LSP integration facility operations and functions are defined along with the LSP requirements for facility design. A description of available JSC life science facilities is presented and a comparison of accommodations versus requirements is reported.
Revenue Forecasting to Integrate CCC Planning and Resource Allocation for Transformative Leadership
ERIC Educational Resources Information Center
Hovey, Ann
2012-01-01
In recent years the majority of California community colleges evaluated for re-accreditation received sanctions requiring documented improvement in the integration of college planning and budgeting processes. This study explores the challenges colleges face and the best practices utilized by successful colleges in implementing integrated…
Cost, cost-efficiency and cost-effectiveness of integrated family planning and HIV services.
Shade, Starley B; Kevany, Sebastian; Onono, Maricianah; Ochieng, George; Steinfeld, Rachel L; Grossman, Daniel; Newmann, Sara J; Blat, Cinthia; Bukusi, Elizabeth A; Cohen, Craig R
2013-10-01
To evaluate costs, cost-efficiency and cost-effectiveness of integration of family planning into HIV services. Integration of family planning services into HIV care and treatment clinics. A cluster-randomized trial. Twelve health facilities in Nyanza, Kenya were randomized to integrate family planning into HIV care and treatment; six health facilities were randomized to (nonintegrated) standard-of-care with separately delivered family planning and HIV services. We assessed costs, cost-efficiency (cost per additional use of more effective family planning), and cost-effectiveness (cost per pregnancy averted) associated with the first year of integration of family planning into HIV care. More effective family planning methods included oral and injectable contraceptives, subdermal implants, intrauterine device, and female and male sterilization. We collected cost data through interviews with study staff and review of financial records to determine costs of service integration. Integration of services was associated with an average marginal cost of $841 per site and $48 per female patient. Average overall and marginal costs of integration were associated with personnel costs [initial ($1003 vs. $872) and refresher ($498 vs. $330) training, mentoring ($1175 vs. $902) and supervision ($1694 vs. $1636)], with fewer resources required for other fixed ($18 vs. $0) and recurring expenses ($471 vs. $287). Integration was associated with a marginal cost of $65 for each additional use of more effective family planning and $1368 for each pregnancy averted. Integration of family planning and HIV services is feasible, inexpensive to implement, and cost-efficient in the Kenyan setting, and thus supports current Kenyan integration policy.
42 CFR 455.12 - State plan requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false State plan requirement. 455.12 Section 455.12 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL ASSISTANCE PROGRAMS PROGRAM INTEGRITY: MEDICAID Medicaid Agency Fraud Detection and...
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
Site systems engineering fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.2
DOE Office of Scientific and Technical Information (OSTI.GOV)
GRYGIEL, M.L.
1998-10-08
Manage the Site Systems Engineering process to provide a traceable integrated requirements-driven, and technically defensible baseline. Through the Site Integration Group(SIG), Systems Engineering ensures integration of technical activities across all site projects. Systems Engineering's primary interfaces are with the RL Project Managers, the Project Direction Office and with the Project Major Subcontractors, as well as with the Site Planning organization. Systems Implementation: (1) Develops, maintains, and controls the site integrated technical baseline, ensures the Systems Engineering interfaces between projects are documented, and maintain the Site Environmental Management Specification. (2) Develops and uses dynamic simulation models for verification of the baselinemore » and analysis of alternatives. (3) Performs and documents fictional and requirements analyses. (4) Works with projects, technology management, and the SIG to identify and resolve technical issues. (5) Supports technical baseline information for the planning and budgeting of the Accelerated Cleanup Plan, Multi-Year Work Plans, Project Baseline Summaries as well as performance measure reporting. (6) Works with projects to ensure the quality of data in the technical baseline. (7) Develops, maintains and implements the site configuration management system.« less
Planning for Space Station Freedom laboratory payload integration
NASA Technical Reports Server (NTRS)
Willenberg, Harvey J.; Torre, Larry P.
1989-01-01
Space Station Freedom is being developed to support extensive missions involving microgravity research and applications. Requirements for on-orbit payload integration and the simultaneous payload integration of multiple mission increments will provide the stimulus to develop new streamlined integration procedures in order to take advantage of the increased capabilities offered by Freedom. The United States Laboratory and its user accommodations are described. The process of integrating users' experiments and equipment into the United States Laboratory and the Pressurized Logistics Modules is described. This process includes the strategic and tactical phases of Space Station utilization planning. The support that the Work Package 01 Utilization office will provide to the users and hardware developers, in the form of Experiment Integration Engineers, early accommodation assessments, and physical integration of experiment equipment, is described. Plans for integrated payload analytical integration are also described.
Accentra Pharmaceuticals: Thrashing through ERP Systems
ERIC Educational Resources Information Center
Bradds, Nathan; Hills, Emily; Masters, Kelly; Weiss, Kevin; Havelka, Douglas
2017-01-01
Implementing and integrating an Enterprise Resource Planning (ERP) system into an organization is an enormous undertaking that requires substantial cash outlays, time commitments, and skilled IT and business personnel. It requires careful and detailed planning, thorough testing and training, and a change management process that creates a…
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurancemore » requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.« less
42 CFR 1002.100 - State plan requirement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 5 2010-10-01 2010-10-01 false State plan requirement. 1002.100 Section 1002.100 Public Health OFFICE OF INSPECTOR GENERAL-HEALTH CARE, DEPARTMENT OF HEALTH AND HUMAN SERVICES OIG AUTHORITIES PROGRAM INTEGRITY-STATE-INITIATED EXCLUSIONS FROM MEDICAID General Provisions § 1002.100 State...
A Search Algorithm for Generating Alternative Process Plans in Flexible Manufacturing System
NASA Astrophysics Data System (ADS)
Tehrani, Hossein; Sugimura, Nobuhiro; Tanimizu, Yoshitaka; Iwamura, Koji
Capabilities and complexity of manufacturing systems are increasing and striving for an integrated manufacturing environment. Availability of alternative process plans is a key factor for integration of design, process planning and scheduling. This paper describes an algorithm for generation of alternative process plans by extending the existing framework of the process plan networks. A class diagram is introduced for generating process plans and process plan networks from the viewpoint of the integrated process planning and scheduling systems. An incomplete search algorithm is developed for generating and searching the process plan networks. The benefit of this algorithm is that the whole process plan network does not have to be generated before the search algorithm starts. This algorithm is applicable to large and enormous process plan networks and also to search wide areas of the network based on the user requirement. The algorithm can generate alternative process plans and to select a suitable one based on the objective functions.
Least-cost transportation planning in ODOT : feasibility report.
DOT National Transportation Integrated Search
1995-03-01
Least-Cost Planning or Integrated Resource Planning is used in the electric utility industry to broaden the scope of choices to meet service requirements. This typically includes methods to reduce to demands for electricity as well the more tradition...
Test, Control and Monitor System maintenance plan
NASA Technical Reports Server (NTRS)
Buehler, David P.; Lougheed, M. J.
1993-01-01
The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.
A continuum of sociotechnical requirements for patient-centered problem lists.
Collins, Sarah; Tsivkin, Kira; Hongsermeier, Tonya; Dubois, David; Nandigam, Hari Krishna; Rocha, Roberto A
2013-01-01
Specific requirements for patient-centered health information technology remain ill-defined. To create operational definitions of patient-centered problem lists, we propose a continuum of sociotechnical requirements with five stages: 1) Intradisciplinary Care Planning: Viewing and searching for problems by discipline; 2) Multi-disciplinary Care Planning: Categorizing problem states to meet discipline-specific needs; 3) Interdisciplinary Care Planning: Sharing and linking problems between disciplines; 4) Integrated and Coordinated Care Planning: Associating problems with assessments, tasks, interventions and outcomes across disciplines for coordination, knowledge development, and reporting; and 5) Patient-Centered Care Planning: Engaging patients in identification of problems and maintenance of their problem list.
TWRS Configuration management program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.
AIS ASM Operational Integration Plan
2013-08-01
al. | Public August 2013 This page intentionally left blank. AIS ASM Operational Integration Plan v ...that supply AIS Routers as part of their AIS shoreside network software : Kongsberg C-Scope, Gatehouse AIS, Transas AIS Network, and CNS DataSwitch...commercial systems would be suitable for the current USCG traffic conditions. The ASM Manager is software that adds the required queuing and
Advanced space program studies. Overall executive summary
NASA Technical Reports Server (NTRS)
Wolfe, M. G.
1977-01-01
NASA and DoD requirements and planning data were used in multidiscipline advanced planning investigations of space operations and associated elements (including man), identification of potential low cost approaches, vehicle design, cost synthesis techniques, technology forecasting and opportunities for DoD technology transfer, and the development near-, mid-, and far-term space initiatives and development plans with emphasis on domestic and military commonality. An overview of objectives and results are presented for the following studies: advanced space planning and conceptual analysis, shuttle users, technology assessment and new opportunities, standardization and program practice, integrated STS operations planning, solid spinning upper stage, and integrated planning support functions.
A template for integrated community sustainability planning.
Ling, Christopher; Hanna, Kevin; Dale, Ann
2009-08-01
This article describes a template for implementing an integrated community sustainability plan. The template emphasizes community engagement and outlines the components of a basic framework for integrating ecological, social and economic dynamics into a community plan. The framework is a series of steps that support a sustainable community development process. While it reflects the Canadian experience, the tools and techniques have applied value for a range of environmental planning contexts around the world. The research is case study based and draws from a diverse range of communities representing many types of infrastructure, demographics and ecological and geographical contexts. A critical path for moving local governments to sustainable community development is the creation and implementation of integrated planning approaches. To be effective and to be implemented, a requisite shift to sustainability requires active community engagement processes, political will, and a commitment to political and administrative accountability, and measurement.
An Integrated Systems Approach: A Description of an Automated Circulation Management System.
ERIC Educational Resources Information Center
Seifert, Jan E.; And Others
These bidding specifications describe requirements for a turn-key automated circulation system for the University of Oklahoma Libraries. An integrated systems approach is planned, and requirements are presented for various subsystems: acquisitions, fund accounting, reserve room, and bibliographic and serials control. Also outlined are hardware…
Space Station Mission Planning System (MPS) development study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
Klus, W. J.
1987-01-01
The basic objective of the Space Station (SS) Mission Planning System (MPS) Development Study was to define a baseline Space Station mission plan and the associated hardware and software requirements for the system. A detailed definition of the Spacelab (SL) payload mission planning process and SL Mission Integration Planning System (MIPS) software was derived. A baseline concept was developed for performing SS manned base payload mission planning, and it was consistent with current Space Station design/operations concepts and philosophies. The SS MPS software requirements were defined. Also, requirements for new software include candidate programs for the application of artificial intelligence techniques to capture and make more effective use of mission planning expertise. A SS MPS Software Development Plan was developed which phases efforts for the development software to implement the SS mission planning concept.
49 CFR 665.11 - Testing requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... braking performance, Structural Integrity, Fuel Economy, Noise, and Emissions; (c) If the new bus model... testing facility shall develop a test plan for the testing of vehicles at the facility. The test plan...
50 CFR 216.275 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Navy shall complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management tool shall include: (1) A method for prioritizing monitoring projects that clearly... potentially modify subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for...
NASA Technical Reports Server (NTRS)
Farah, Jeffrey J.
1992-01-01
Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.
NASA Technical Reports Server (NTRS)
1974-01-01
The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.
2014 SRP Integration Transcript
NASA Technical Reports Server (NTRS)
Steinberg, Susan
2014-01-01
HRP's mission is to reduce the risks to human health and performance during long-duration spaceflight. The HRP Integrated Research Plan (IRP) contains the research plans for the 32 risks that require research to characterize and mitigate. From its inception the "integrate" aspect of the IRP has denoted the integrated nature of risks to human health and performance. Even though each risk in the IRP has its own research plan and is tracked separately, the interrelated nature of health and performance requires that they be addressed in an integrative or holistic fashion so that the connectedness of physiological systems within the human body and the integrated response to spaceflight can be addressed. Common characteristics of the spaceflight environment include altered gravity, atmospheres, and light/dark cycles; space radiation; isolation; noise; and periods of high or low workload. Long-term exposure to this unique environment produces a suite of physiological effects such as stress; vision, neurocognitive, and anthropometric changes; circadian misalignment; fluid shifts; cardiovascular deconditioning; immune dysregulation; and altered nutritional requirements. Expanding cross-disciplinary integrative approaches that synthesize concepts or data from two or more disciplines would improve the identification and characterization risk factors, and enable the development of countermeasures relevant to multiple risks. Cross-disciplinary approaches might also help to illuminate problem areas that may arise when a countermeasure adversely impacts risks other than those which it was developed to mitigate, or to identify groupings of physiological changes that are likely to occur that may impact the overall risk posture. In 2014 HRP embarked on a pilot study that combined four SRPs (and 12 HRP risks) - Behavioral Health, Sensorimotor, Cardiovascular, and Bone/Muscle - specifically to discuss cross-disciplinary integration. The points outlined below were suggested to seed the discussion, within the bounding constraint that research plans must be feasible and relevant to the HRP mission. While these were suggested starting points, the overall guiding principle was to allow free discussion from panel members on any aspect of integrated research that they felt was important, Existing cross-disciplinary integration as documented in the IRP (HRR), Existing or needed integration already identified by HRP, but not yet well defined within the IRP, Areas of integration that are missing.
Teacher-Education Student Perceptions for Stages of Concern Related to Integrating Technology
ERIC Educational Resources Information Center
Quadrini, Virginia Horak
2013-01-01
In this study, research includes support for technology integration in the classroom. The National Education Technology Plan Summary (2010) included research to support the requirement of teachers to integrate technology into instruction. Teacher-education student programs need to include additional training for integrating technology into…
14 CFR 1214.810 - Integration of payloads.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Integration of payloads. 1214.810 Section... for Spacelab Services § 1214.810 Integration of payloads. (a) The customer shall bear the cost of... mission. (2) Generation of mission requirements and their documentation in the Payload Integration Plan...
50 CFR 216.175 - Requirements for monitoring and reporting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... complete an Integrated Comprehensive Monitoring Plan (ICMP) in 2009. This planning and adaptive management... subsequent monitoring and mitigation. (4) An adaptive management plan. (5) A method for standardizing data... Report—The Navy shall submit a report annually on October 1 describing the implementation and results...
30 CFR 250.427 - What are the requirements for pressure integrity tests?
Code of Federal Regulations, 2011 CFR
2011-07-01
..., AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Oil and Gas Drilling Operations Casing and Cementing Requirements § 250.427 What are the... planned casing setting depth. You must conduct each pressure integrity test after drilling at least 10...
Groundwater regulation and integrated planning
Quevauviller, Philippe; Batelaan, Okke; Hunt, Randall J.
2016-01-01
The complex nature of groundwater and the diversity of uses and environmental interactions call for emerging groundwater problems to be addressed through integrated management and planning approaches. Planning requires different levels of integration dealing with: the hydrologic cycle (the physical process) including the temporal dimension; river basins and aquifers (spatial integration); socioeconomic considerations at regional, national and international levels; and scientific knowledge. The great natural variation in groundwater conditions obviously affects planning needs and options as well as perceptions from highly localised to regionally-based approaches. The scale at which planning is done therefore needs to be carefully evaluated against available policy choices and options in each particular setting. A solid planning approach is based on River Basin Management Planning (RBMP), which covers: (1) objectives that management planning are designed to address; (2) the way various types of measures fit into the overall management planning; and (3) the criteria against which the success or failure of specific strategies or interventions can be evaluated (e.g. compliance with environmental quality standards). A management planning framework is to be conceived as a “living” or iterated document that can be updated, refined and if necessary changed as information and experience are gained. This chapter discusses these aspects, providing an insight into European Union (EU), United States and Australia groundwater planning practices.
Step 1: Human System Integration Pilot-Technology Interface Requirements for Weather Management
NASA Technical Reports Server (NTRS)
2005-01-01
This document involves definition of technology interface requirements for Hazardous Weather Avoidance. Technology concepts in use by the Access 5 Weather Management Work Package were considered. Beginning with the Human System Integration (HIS) high-level functional requirement for Hazardous Weather Avoidance, and Hazardous Weather Avoidance technology elements, HSI requirements for the interface to the pilot were identified. Results of the analysis describe (1) the information required by the pilot to have knowledge of hazardous weather, and (2) the control capability needed by the pilot to obtain hazardous weather information. Fundamentally, these requirements provide the candidate Hazardous Weather Avoidance technology concepts with the necessary human-related elements to make them compatible with human capabilities and limitations. The results of the analysis describe how Hazardous Weather Avoidance operations and functions should interface with the pilot to provide the necessary Weather Management functionality to the UA-pilot system. Requirements and guidelines for Hazardous Weather Avoidance are partitioned into four categories: (1) Planning En Route (2) Encountering Hazardous Weather En Route, (3) Planning to Destination, and (4) Diversion Planning Alternate Airport. Each requirement is stated and is supported with a rationale and associated reference(s).
14 CFR § 1216.303 - NEPA process in NASA planning and decision making.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false NEPA process in NASA planning and decision... Act (NEPA) § 1216.303 NEPA process in NASA planning and decision making. (a) NEPA requires the... integration of the NEPA process with NASA project and program planning improves Agency decisions and ensures...
SIM Lite: Ground Alignment of the Instrument
NASA Technical Reports Server (NTRS)
Dekens, Frank G.; Goullioud, Renaud; Nicaise, Fabien; Kuan, Gary; Morales, Mauricio
2010-01-01
We present the start of the ground alignment plan for the SIM Lite Instrument. We outline the integration and alignment of the individual benches on which all the optics are mounted, and then the alignment of the benches to form the Science and Guide interferometers. The Instrument has a guide interferometer with only a 40 arc-seconds field of regard, and 200 arc-seconds of alignment adjustability. This requires each sides of the interferometer to be aligned to a fraction of that, while at the same time be orthogonal to the baseline defined by the External Metrology Truss. The baselines of the Science and Guide interferometers must also be aligned to be parallel. The start of these alignment plans is captured in a SysML Instrument System model, in the form of activity diagrams. These activity diagrams are then related to the hardware design and requirements. We finish with future plans for the alignment and integration activities and requirements.
SIM Lite: ground alignment of the instrument
NASA Astrophysics Data System (ADS)
Dekens, Frank G.; Goullioud, Renaud; Nicaise, Fabien; Kuan, Gary; Morales, Mauricio
2010-07-01
We present the start of the ground alignment plan for the SIM Lite Instrument. We outline the integration and alignment of the individual benches on which all the optics are mounted, and then the alignment of the benches to form the Science and Guide interferometers. The Instrument has a guide interferometer with only a 40 arc-seconds field of regard, and 200 arc-seconds of alignment adjustability. This requires each sides of the interferometer to be aligned to a fraction of that, while at the same time be orthogonal to the baseline defined by the External Metrology Truss. The baselines of the Science and Guide interferometers must also be aligned to be parallel. The start of these alignment plans is captured in a SysML Instrument System model, in the form of activity diagrams. These activity diagrams are then related to the hardware design and requirements. We finish with future plans for the alignment and integration activities and requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eccleston, C.H.
1997-09-05
The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less
NASA Technical Reports Server (NTRS)
Uhran, M. L.; Youngblood, W. W.; Georgekutty, T.; Fiske, M. R.; Wear, W. O.
1986-01-01
Taking advantage of the microgravity environment of space NASA has initiated the preliminary design of a permanently manned space station that will support technological advances in process science and stimulate the development of new and improved materials having applications across the commercial spectrum. Previous studies have been performed to define from the researcher's perspective, the requirements for laboratory equipment to accommodate microgravity experiments on the space station. Functional requirements for the identified experimental apparatus and support equipment were determined. From these hardware requirements, several items were selected for concept designs and subsequent formulation of development plans. This report documents the concept designs and development plans for two items of experiment apparatus - the Combustion Tunnel and the Advanced Modular Furnace, and two items of support equipment the Laser Diagnostic System and the Integrated Electronics Laboratory. For each concept design, key technology developments were identified that are required to enable or enhance the development of the respective hardware.
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Space Station - An integrated approach to operational logistics support
NASA Technical Reports Server (NTRS)
Hosmer, G. J.
1986-01-01
Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.
Moving from Survival to Fulfillment: A Planning Framework for Community Schools
ERIC Educational Resources Information Center
Shaia, Wendy E.; Finigan-Carr, Nadine
2018-01-01
Community schooling is an effective tool for combating the effects of poverty by integrating academic, social service, health, and economic supports for students, families, and community members. But this is complex work, requiring extraordinarily careful planning and assessment. This article suggests a planning framework that can help community…
Somme, Dominique; Trouvé, Hélène; Perisset, Catherine; Corvol, Aline; Ankri, Joël; Saint-Jean, Olivier; de Stampa, Matthieu
2014-01-01
Introduction Many countries face ageing-related demographic and epidemiological challenges, notably neurodegenerative disorders, due to the multiple care services they require, thereby pleading for a more integrated system of care. The integrated Quebecois method issued from the Programme of Research to Integrate Services for the Maintenance of Autonomy inspired a French pilot experiment and the National Alzheimer Plan 2008–2012. Programme of Research to Integrate Services for the Maintenance of Autonomy method implementation was rated with an evaluation grid adapted to assess its successive degrees of completion. Discussion The approaching end of the president's term led to the method's institutionalization (2011–2012), before the implementation study ended. When the government changed, the study was interrupted. The results extracted from that ‘lost’ study (presented herein) have, nonetheless, ‘found’ some key lessons. Key lessons/conclusion It was possible to implement a Quebecois integrated-care method in France. We describe the lessons and pitfalls encountered in adapting this evaluation tool. This process is necessarily multidisciplinary and requires a test phase. A simple tool for quantitative assessment of integration was obtained. The first assessment of the tool was unsatisfactory but requires further studies. In the meantime, we recommend using mixed methodologies to assess the services integration level. PMID:24959112
Development of an Integrated Waste Plan for Chalk River Laboratories - 13376
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, L.
2013-07-01
To further its Strategic Planning, the Atomic Energy of Canada Limited (AECL) required an effective approach to developing a fully integrated waste plan for its Chalk River Laboratories (CRL) site. Production of the first Integrated Waste Plan (IWP) for Chalk River was a substantial task involving representatives from each of the major internal stakeholders. Since then, a second revision has been produced and a third is underway. The IWP remains an Interim IWP until all gaps have been resolved and all pathways are at an acceptable level of detail. Full completion will involve a number of iterations, typically annually formore » up to six years. The end result of completing this process is a comprehensive document and supporting information that includes: - An Integrated Waste Plan document summarizing the entire waste management picture in one place; - Details of all the wastes required to be managed, including volume and timings by waste stream; - Detailed waste stream pathway maps for the whole life-cycle for each waste stream to be managed from pre-generation planning through to final disposition; and - Critical decision points, i.e. decisions that need to be made and timings by when they need to be made. A waste inventory has been constructed that serves as the master reference inventory of all waste that has been or is committed to be managed at CRL. In the past, only the waste that is in storage has been effectively captured, and future predictions of wastes requiring to be managed were not available in one place. The IWP has also provided a detailed baseline plan at the current level of refinement. Waste flow maps for all identified waste streams, for the full waste life cycle complete to disposition have been constructed. The maps identify areas requiring further development, and show the complexities and inter-relationships between waste streams. Knowledge of these inter-dependencies is necessary in order to perform effective options studies for enabling facilities that may be necessary for multiple related waste streams. The next step is to engage external stakeholders in the optioneering work required to provide enhanced confidence that the path forward identified within future iterations of the IWP will be acceptable to all. (authors)« less
NASA Technical Reports Server (NTRS)
Cork, M. J.; Barnett, P. M.; Shaffer, J., Jr.; Doran, B. J.
1979-01-01
Earth escape mission requirements on Solar Electric Propulsion System (SEPS), and the interface definition and planned integration between SEPS, user spacecraft, and other elements of the STS. Emphasis is placed on the Comet rendezvous mission, scheduled to be the first SEPS user. Interactive SEPS interface characteristics with spacecraft and mission, as well as the multiple organizations and inter-related development schedules required to integrate the SEPS with spacecraft and STS, require early attention to definition of interfaces in order to assure a successful path to the first SEPS launch in July 1985
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trujillo, Angelina Michelle
Strategy, Planning, Acquiring- very large scale computing platforms come and go and planning for immensely scalable machines often precedes actual procurement by 3 years. Procurement can be another year or more. Integration- After Acquisition, machines must be integrated into the computing environments at LANL. Connection to scalable storage via large scale storage networking, assuring correct and secure operations. Management and Utilization – Ongoing operations, maintenance, and trouble shooting of the hardware and systems software at massive scale is required.
Step 1: Human System Integration Simulation and Flight Test Progress Report
NASA Technical Reports Server (NTRS)
2005-01-01
The Access 5 Human Systems Integration Work Package produced simulation and flight demonstration planning products for use throughout the program. These included: Test Objectives for Command, Control, Communications; Pilot Questionnaire for Command, Control, Communications; Air Traffic Controller Questionnaire for Command, Control, Communications; Test Objectives for Collision Avoidance; Pilot Questionnaire for Collision Avoidance; Plans for Unmanned Aircraft Systems Control Station Simulations Flight Requirements for the Airspace Operations Demonstration
NASA Technical Reports Server (NTRS)
Logston, R. G.; Budris, G. D.
1977-01-01
The methodology to optimize the utilization of Spacelab racks and pallets and to apply this methodology to the early STS Spacelab missions was developed. A review was made of Spacelab Program requirements and flow plans, generic flow plans for racks and pallets were examined, and the principal optimization criteria and methodology were established. Interactions between schedule, inventory, and key optimization factors; schedule and cost sensitivity to optional approaches; and the development of tradeoff methodology were addressed. This methodology was then applied to early spacelab missions (1980-1982). Rack and pallet requirements and duty cycles were defined, a utilization assessment was made, and several trade studies performed involving varying degrees of Level IV integration, inventory level, and shared versus dedicated Spacelab racks and pallets.
AUTOPLAN: A PC-based automated mission planning tool
NASA Technical Reports Server (NTRS)
Paterra, Frank C.; Allen, Marc S.; Lawrence, George F.
1987-01-01
A PC-based automated mission and resource planning tool, AUTOPLAN, is described, with application to small-scale planning and scheduling systems in the Space Station program. The input is a proposed mission profile, including mission duration, number of allowable slip periods, and requirement profiles for one or more resources as a function of time. A corresponding availability profile is also entered for each resource over the whole time interval under study. AUTOPLAN determines all integrated schedules which do not require more than the available resources.
Fuels planning: science synthesis and integration
Rachel White; Sarah McCaffrey
2007-01-01
A century of fire suppression has created heavy fuel loads in many U.S. forests, leading to increasingly intense wildfires. Addressing this problem will require widespread fuels treatments, yet fuels treatment planners do not always have access to the current scientific information that can help guide their planning process. The Fuels Planning: Science Synthesis and...
Challenge of Effective Technology Integration into Teaching and Learning
ERIC Educational Resources Information Center
Ramorola, M. Z.
2013-01-01
South African teachers are faced with challenges in integrating technology effectively into a coherent framework at school level. There seems to be little evidence of technology integration into classroom activities such as systematic planning and implementation of lessons that require learners to think critically, work collaboratively, and use…
Practical Insights into Curricula Integration for Primary Science
ERIC Educational Resources Information Center
Hudson, Peter
2012-01-01
As indicated in a previous Teaching Science article, effective planning for curricula integration requires using standards from two (or more) subject areas (e.g., Science and English, Science and Art or Science and Mathematics), which also becomes the assessment foci for teaching and learning. Curricula integration of standards into an activity…
Earth orbital experiment program and requirements study, volume 1, sections 1 - 6
NASA Technical Reports Server (NTRS)
1971-01-01
A reference manual for planners of manned earth-orbital research activity is presented. The manual serves as a systems approach to experiment and mission planning based on an integrated consideration of candidate research programs and the appropriate vehicle, mission, and technology development requirements. Long range goals and objectives for NASA activities during the 1970 to 1980 time period are analyzed. The useful and proper roles of manned and automated spacecraft for implementing NASA experiments are described. An integrated consideration of NASA long range goals and objectives, the system and mission requirements, and the alternative implementation plans are developed. Specific areas of investigation are: (1) manned space flight requirements, (2) space biology, (3) spaceborne astronomy, (4) space communications and navigation, (5) earth observation, (6) supporting technology development requirements, (7) data management system matrices, (8) instrumentation matrices, and (9) biotechnology laboratory experiments.
Is health systems integration being advanced through Local Health District planning?
Saunders, Carla; Carter, David J
2017-05-01
Objective Delivering genuine integrated health care is one of three strategic directions in the New South Wales (NSW) Government State Health Plan: Towards 2021. This study investigated the current key health service plan of each NSW Local Health District (LHD) to evaluate the extent and nature of health systems integration strategies that are currently planned. Methods A scoping review was conducted to identify common key principles and practices for successful health systems integration to enable the development of an appraisal tool to content assess LHD strategic health service plans. Results The strategies that are planned for health systems integration across LHDs focus most often on improvements in coordination, health care access and care delivery for complex at-risk patients across the care continuum by both state- and commonwealth-funded systems, providers and agencies. The most common reasons given for integrated activities were to reduce avoidable hospitalisation, avoid inappropriate emergency department attendance and improve patient care. Conclusions Despite the importance of health systems integration and finding that all NSW LHDs have made some commitment towards integration in their current strategic health plans, this analysis suggests that health systems integration is in relatively early development across NSW. What is known about the topic? Effective approaches to managing complex chronic diseases have been found to involve health systems integration, which necessitates sound communication and connection between healthcare providers across community and hospital settings. Planning based on current health systems integration knowledge to ensure the efficient use of scarce resources is a responsibility of all health systems. What does this paper add? Appropriate planning and implementation of health systems integration is becoming an increasingly important expectation and requirement of effective health systems. The present study is the first of its kind to assess the planned activity in health systems integration in the NSW public health system. NSW health districts play a central role in health systems integration; each health service plan outlines the strategic directions for the development and delivery of all state-funded services across each district for the coming years, equating to hundreds of millions of dollars in health sector funding. The inclusion of effective health systems integration strategies allows Local Health Districts to lay the foundation for quality patient outcomes and long-term financial sustainability despite projected increases in demand for health services. What are the implications for practice? Establishing robust ongoing mechanisms for effective health systems integration is now a necessary part of health planning. The present study identifies several key areas and strategies that are wide in scope and indicative of efforts towards health systems integration, which may support Local Health Districts and other organisations in systematic planning and implementation.
Report to Congress : Surface Transportation Research and Development Plan : Fourth Edition
DOT National Transportation Integrated Search
1997-01-01
Section 6009(b) of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) requires that the U.S. Department of Transportation (DOT) develop an integrated National Surface Transportation Research and Development (R&D) Plan that focuses o...
NASA Technical Reports Server (NTRS)
Melcher, Kevin J.; Maul, William A.; Garg, Sanjay
2007-01-01
The constraints of future Exploration Missions will require unique integrated system health management capabilities throughout the mission. An ambitious launch schedule, human-rating requirements, long quiescent periods, limited human access for repair or replacement, and long communication delays, all require an integrated approach to health management that can span distinct, yet interdependent vehicle subsystems, anticipate failure states, provide autonomous remediation and support the Exploration Mission from beginning to end. Propulsion is a critical part of any space exploration mission, and monitoring the health of the propulsion system is an integral part of assuring mission safety and success. Health management is a somewhat ubiquitous technology that encompasses a large spectrum of physical components and logical processes. For this reason, it is essential to develop a systematic plan for propulsion health management system development. This paper provides a high-level perspective of propulsion health management systems, and describes a logical approach for the future planning and early development that are crucial to planned space exploration programs. It also presents an overall approach, or roadmap, for propulsion health management system development and a discussion of the associated roadblocks and challenges.
NASA Astrophysics Data System (ADS)
KP, R. M. Bambang Setyohadi; Wicaksono, Dimas
2018-03-01
The poverty is one of the prevailing problems in Indonesia until now. Even a change of the era of governance has not succeeded in eradicating the problem of poverty. The program of poverty alleviation program has always been a focus in the budget allocation in all era of leadership in Indonesia. Those programs were strategic because it prepared the foundation of community self-reliance in the form of representative, entrenched and conducive community leadership institutions to develop of social capital of society in the future. Developing an area of the village requires an integrated planning (Grand Design) to figure out the potential and the problems existing in the rural area as well as the integration of the rural area surrounding. In addition, the grand design needs to be synchronized to the more comprehensive spatial plan with a hierarchical structure such as RTBL, RDTRK / RRTRK, RTRK, and RTRW. This rural area management plan can be oriented or refer to the pattern developed from neighborhood Development program which is part of the PNPM Mandiri program. The neighborhood development program is known as residential area development plan whose process involves of the entire community. Therefore, the regional development up to the scale of the environment requires the planning phase. Particularly, spatial planning which emphasizes the efforts to optimize sectorial development targets to be integrated into an integrated development process must be conducted, in addition to taking into consideration the opportunities, potentials and limitations of the resources, the level of interconnection with the central government within the district and between sub-districts and rural areas.
NASA Technical Reports Server (NTRS)
Griner, James H.
2014-01-01
NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication (CNPC) system prototype radio, operating on recently allocated UAS frequency spectrum bands. This prototype radio is being used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current plans for the prototype radio development.
Team table: a framework and tool for continuous factory planning
NASA Astrophysics Data System (ADS)
Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus
2000-10-01
Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.
Integration of safety engineering into a cost optimized development program.
NASA Technical Reports Server (NTRS)
Ball, L. W.
1972-01-01
A six-segment management model is presented, each segment of which represents a major area in a new product development program. The first segment of the model covers integration of specialist engineers into 'systems requirement definition' or the system engineering documentation process. The second covers preparation of five basic types of 'development program plans.' The third segment covers integration of system requirements, scheduling, and funding of specialist engineering activities into 'work breakdown structures,' 'cost accounts,' and 'work packages.' The fourth covers 'requirement communication' by line organizations. The fifth covers 'performance measurement' based on work package data. The sixth covers 'baseline requirements achievement tracking.'
A Probe into Key Points in the Planning and Design of Integrated Corridor at Large Civil Airports
NASA Astrophysics Data System (ADS)
Zhao, Qing
2018-05-01
If we compare an airport to our human body, all sorts of specialized pipelines and wires are to an airport as the vascular system and nervous system etc. to the human body, where each functional zone connecting the airport serves each major system of airport and provides “throughput like the function of driving out the processed for the new” and “central control and transmission function”. Guided by the master plan and the concept of progressive development of airports, it is critical to map out a plan to link near-term and long-term development of supporting utilities. The role and effect of integrated corridor is of significance to the construction of multi-runway large-sized new airports or to the expansion of an airport costing tens of billions. In view of the features of the fast growing civil aviation sector in China, this thesis argues for the necessity to plan for and build integrated corridor at large airports, suggests doing research on integrated corridor at the project consulting stage by drawing upon available airport design experiences and case studies and combining the plan for public utilities (or special plan), and analyzes and outlines key points in integrated corridor design based on special requirements and industrial standards for civil airport management.
Science in a Team Environment (AKA, How to Play Nicely with Others)
NASA Technical Reports Server (NTRS)
Platts, S. H.; Primeaux, L.; Swarmer, T.; Yarbough, P. O
2017-01-01
So you want to do NASA funded research in a spaceflight analog? There are several things about participating in an HRP managed analog that may be different from the way you normally do work in your laboratory. The purpose of this presentation is to highlight those differences and explain some of the unique aspects of doing this research. Participation in an HRP funded analog study complement, even if initially selected for funding, is not automatic and involves numerous actions from ISSMP, HRP, and the PI. There are steps that have to be taken and processes to follow before approval and ISSMP-FA integration. After the proposal and acceptance process the Investigator works closely with the Flight Analog team to ensure full integration of their study requirements into a compliment. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a non-interference basis for implementation. Full integration into the analog platform can be broken down into three phases: integration, preparation, and implementation. These phases occur in order with some overlap in the integration and preparation phase. The ISSMP-FA team integrates, plans and implements analog study complements. Properly defining your research requirements and getting them documented is one of the most critical components to ensure successful integration and implementation of your study, but is also one of the most likely to be neglected by PIs. Requirements that are not documented, or that are documented poorly are unlikely to get done, no matter how much you push. The process to document requirements is two-fold, consisting of an initial individual requirements integration and then a compliment requirements integration. Understanding the requirements in detail and early ensures that the science is not compromised by outside influences. This step is vital to the integration, preparation, and implementation phases. The individual requirements integration is the first step in ensuring that the research fits into an available analog platform or allows for the Flight Analog team to provide information on structural study changes for participation in the analog. At this early point investigators need to understand exactly what their requirements are to produce relevant data and convey their must have needs to the Flight Analog team. The fluid nature of analog platforms allow for minor alterations to the operational structure. Participation in analog research requires flexibility from the investigator to ensure implementation of their research into a flight like analog platform. The compliment integration requires plasticity; investigators are asked to work closely with one another and the Flight Analog team to combine research studies into a single study plan. This study plan's ultimate goal is to facilitate multiple study participation with minimal scientific impact to each individual study. The Flight Analogs team works to find the best compromise for all parties while protecting the flight like atmosphere of a particular analog. Additional restrictions, limitations and constraints may be required by the analog in order to make all of the science work. Many studies need to be combined into each complement and there are a limited number of hours available for data collection. Through data/sample sharing, we can reduce the burden on the test subject, while usually avoiding significant science impacts. Restrictions on food, exercise, medications and sleep cycle are important to consider for your research.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-19
... can be provided in the desired format; the reporting burden (time and financial resources) is... for Submission of the Strategic State Plan for title I of the Workforce Investment Act of 1998 (WIA...'' strategic plan for title I of the Workforce Investment Act of 1998 and the Wagner-Peyser Act (WIA Section...
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
Research notes : GIS mapping of environmental justice populations.
DOT National Transportation Integrated Search
2005-03-01
As part of the requirements for receiving federal funds, ODOT is responsible for successfully integrating environmental justice (EJ) into its program and planning activities. Environmental justice requires ODOT to avoid, minimize, or mitigate disprop...
RMP*eSubmit facilitates secure online Risk Management Plan updates/resubmissions, required at least every 5 years. Reporting requirements have not changed since 2004, but the 2012 version of North American Industry Classification System has been integrated
Building Excellence in Project Execution: Integrated Project Management
2015-04-30
challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution...Systems Center Pacific (SSC Pacific) is addressing this challenge by adopting and refining the CMMI Model, and building the tenets of integrated project...successfully managing stakeholder expectations and meeting requirements. Under the Capability Maturity Model Integration ( CMMI ), IPM is defined as
UAS Integration in the NAS Project Overview: RTCA SC-228 Plenary DAA Working Group 5
NASA Technical Reports Server (NTRS)
Randall, Debra K.
2014-01-01
The presentation is intended to allow the public to know and understand NASA's plans for integrated test to allow them the opportunity to provide feedback and suggestions. The integrated testing will support verification and validation of the RTCA SC-228 UAS minimum operation performance standard requirements.
NASA Astrophysics Data System (ADS)
Curci, Vita; Dassisti, Michele; Josefa, Mula Bru; Manuel, Díaz Madroñero
2014-10-01
Supply chain model (SCM) are potentially capable to integrate different aspects in supporting decision making for enterprise management tasks. The aim of the paper is to propose an hybrid mathematical programming model for optimization of production requirements resources planning. The preliminary model was conceived bottom-up from a real industrial case analysed oriented to maximize cash flow. Despite the intense computational effort required to converge to a solution, optimisation done brought good result in solving the objective function.
The key to successful management of STS operations: An integrated production planning system
NASA Technical Reports Server (NTRS)
Johnson, W. A.; Thomasen, C. T.
1985-01-01
Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.
The background and theory of integrated risk management
NASA Technical Reports Server (NTRS)
Hunsucker, John L.
1995-01-01
While all good managers have always considered risk in their decision making, only recently have formal programs to do so been introduced. This report covers the logical structure behind the formulation of an integrated risk management plan (IRM). Included in the report are factors forcing the development of a formal plan to consider risk, the basic objective or purpose of an IRM, and desirable traits of such a plan. The report moves on to a discussion of background issues, seeks to formalize some definitions, and then discusses required information on threats. The report concludes with the steps for an IRM.
Advanced Simulation and Computing Fiscal Year 2016 Implementation Plan, Version 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
McCoy, M.; Archer, B.; Hendrickson, B.
2015-08-27
The Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, surety, and reliability of the U.S. nuclear stockpile. The SSP uses nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. It includes stockpile surveillance, experimental research, development and engineering programs, and an appropriately scaled production capability to support stockpile requirements. This integrated national program requires the continued use of experimental facilities and programs, and the computational capabilities to support these programs. The purpose of this IP is to outline key work requirements to be performed and to control individualmore » work activities within the scope of work. Contractors may not deviate from this plan without a revised WA or subsequent IP.« less
Integrated planning and scheduling for Earth science data processing
NASA Technical Reports Server (NTRS)
Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.
1995-01-01
Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
Turnaround Operations Analysis for OTV. Volume 3: Technology Development Plan
NASA Technical Reports Server (NTRS)
1988-01-01
An integrated technology development plan for the technologies required to process both GBOTVs and SBOTVs are described. The plan includes definition of the tests and experiments to be accomplished on the ground, in a Space Shuttle Sortie Mission, on an Expendable Launch Vehicle, or at the Space Station as a Technology Development Mission (TDM). The plan reflects and accommodates current and projected research and technology programs where appropriate.
Integration of Environmental Planning Into the Army Master Planning Process
1992-10-01
Creating and implementing 13 required component plans (and additional optional ones) can be unwieldy and time consuming. There is also a fair amount of...agencies. This review is to occur following internal installation review, but prior to review and approval by the Major Command (MACOM) or Headquarters...master planning regulations and guidelines is a lack of internal consistency. Through these revisions, the guidelines should be made entirely
Fly-By-Light/Power-By-Wire Requirements and Technology Workshop
NASA Technical Reports Server (NTRS)
Baker, Robert L. (Editor); Pitts, Felix L. (Editor)
1992-01-01
The results of the Fly-By-Light/Power-By-Wire (FBL/PBW) Workshop held on March 17-19, 1992, at the NASA Langley Research Center are presented. The FBL/PBW program is a joint NASA LeRC/LaRC effort to develop the technology base for confident application of integrated FBL/PBW systems to transport aircraft. The objectives of the workshop were to ascertain the FBL/PBW program technical requirements and satisfy the requirements and needs from the industry viewpoint, provide a forum for presenting and documenting alternative technical approaches which satisfy the requirements, and assess the plan adequacy in accomplishing plan objectives, aims, and technology transfer. Areas addressed were: optical sensor systems, power-by-wire systems, FBL/PBW fault-tolerant architectures, electromagnetic environment assessment, and system integration and demonstration. The workshop consisted of an introductory meeting, a 'keynote' presentation, a series of individual panel sessions covering the above areas, with midway presentations by the panel chairpersons, followed by a final summarizing/integrating session by the individual panels, and a closing plenary session summarizing the results of the workshop.
Optimal Black Start Resource Allocation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Qiu, Feng; Wang, Jianhui; Chen, Chen
The restoration of the bulk power system after a partial or complete blackout relies on black-start (BS) resources. To prepare for system restoration, it is important to procure the right amount of BS resources at the right locations in the grid so that the total restoration time can be minimized. Achieving this goal requires that resource procurement planning takes the restoration process into account. In this study, we integrate the BS resource procurement decision with a restoration planning model and develop an optimization model that produces a minimal cost procurement plan that satisfies the restoration time requirement.
DOT National Transportation Integrated Search
2017-10-01
Plans crafted by metropolitan planning organizations (MPOs) lay out how billions of dollars in transportation investments will be made over a 20 to 30-year time horizon. Federal transportation authorizations require MPOs to identify and track key ind...
DOT National Transportation Integrated Search
2014-12-01
Federal law requires that metropolitan transportation plans include operations and : management strategies to improve the performance of existing roads, relieve congestion, : and maximize the safety and mobility of people and cargo. Transportation op...
Strategic planning for the International Space Station
NASA Technical Reports Server (NTRS)
Griner, Carolyn S.
1990-01-01
The concept for utilization and operations planning for the International Space Station Freedom was developed in a NASA Space Station Operations Task Force in 1986. Since that time the concept has been further refined to definitize the process and products required to integrate the needs of the international user community with the operational capabilities of the Station in its evolving configuration. The keystone to the process is the development of individual plans by the partners, with the parameters and formats common to the degree that electronic communications techniques can be effectively utilized, while maintaining the proper level and location of configuration control. The integration, evaluation, and verification of the integrated plan, called the Consolidated Operations and Utilization Plan (COUP), is being tested in a multilateral environment to prove out the parameters, interfaces, and process details necessary to produce the first COUP for Space Station in 1991. This paper will describe the concept, process, and the status of the multilateral test case.
Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilborn, Bill R.; Boehlecke, Robert F.
The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.
1990-01-01
This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.
Seven Processes that Enable NASA Software Engineering Technologies
NASA Technical Reports Server (NTRS)
Housch, Helen; Godfrey, Sally
2011-01-01
This slide presentation reviews seven processes that NASA uses to ensure that software is developed, acquired and maintained as specified in the NPR 7150.2A requirement. The requirement is to ensure that all software be appraised for the Capability Maturity Model Integration (CMMI). The enumerated processes are: (7) Product Integration, (6) Configuration Management, (5) Verification, (4) Software Assurance, (3) Measurement and Analysis, (2) Requirements Management and (1) Planning & Monitoring. Each of these is described and the group(s) that are responsible is described.
NASA Astrophysics Data System (ADS)
Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.
2017-09-01
One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.
NASA Technical Reports Server (NTRS)
Mandell, Avi M.; Groff, Tyler D.; Gong, Qian; Rizzo, Maxime J.; Lupu, Roxana; Zimmerman, Neil T.; Saxena, Prabal; McElwain, Michael W.
2017-01-01
One of the key science goals of the Coronograph Instrument (CGI) on the WFIRST mission is to spectrally characterize the atmospheres of planets around other stars at extremely high contrast levels. To achieve this goal, the CGI Instrument will include a integral field spectrograph (IFS) as one of the two science cameras. We present the current science requirements that pertain to the IFS design, describe how our design implementation flows from these requirements, and outline our current instrument design.
Integrating MRP (materiel requirements planning) II and JIT to achieve world-class status.
Titone, R C
1994-05-01
The concepts and principles of using manufacturing resource planning (MRP II) for planning are not new. Their success has been proven in numerous manufacturing companies in America. The concepts and principles of using just-in-time (JIT) inventory for execution, while more recent, have also been available for some time, and their success in Japan well documented. However, it is the effective integration of these two powerful tools that open the way to achieving world-class manufacturing status. This article will utilize a newly developed world-class manufacturing model, which will review the aspects of planning, beginning with a business plan through the production planning process and culminating with a master schedule that drives a materiel/capacity plan. The importance and interrelationship of these functions are reviewed. The model then illustrates the important aspects of executing these plans beginning with people issues, through total quality control (TQC) and pull systems. We will then utilize this new functional model to demonstrate the relationship between these various functions and the importance of integrating them with a total comprehensive manufacturing strategy that will lead to world-class manufacturing and profits.
45 CFR 225.2 - State plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
...: (1) Such methods of recruitment and selection as will offer opportunity for full-time or part-time... personnel of which subprofessional staff are an integral part; (3) A career service plan permitting persons... provide for: (1) A position in which rests responsibility for the development, organization, and...
Adapting Entry-Level Engineering Courses to Emphasize Critical Thinking
ERIC Educational Resources Information Center
Hagerty, D. Joseph; Rockaway, Thomas D.
2012-01-01
The University of Louisville recently developed a Quality Enhancement Plan (QEP) to improve undergraduate instruction across all disciplines as part of its ongoing accreditation requirements. Central elements of the plan are emphasis on critical thinking; integration of critical thinking throughout the curriculum; service learning for…
Mission management - Lessons learned from early Spacelab missions
NASA Technical Reports Server (NTRS)
Craft, H. G., Jr.
1980-01-01
The concept and the responsibilities of a mission manager approach are reviewed, and some of the associated problems in implementing Spacelab mission are discussed. Consideration is given to program control, science management, integrated payload mission planning, and integration requirements. Payload specialist training, payload and launch site integration, payload flight/mission operations, and postmission activities are outlined.
ERIC Educational Resources Information Center
Ngeru, James
2012-01-01
In the past few decades, adoption of Enterprise Integration (EI) through initiatives such as Service Oriented Architecture (SOA), Enterprise Application Integration (EAI) and Enterprise Resource Planning (ERP) has consistently dominated most of organizations' top strategic priorities. Additionally, the field of EI has generated a vast amount…
Integrated Facilities and Infrastructure Plan.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Reisz Westlund, Jennifer Jill
Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continuedmore » to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.« less
Utility Company Electric Vehicle (EV) Charging Load Projection Requirement The Public Utilities Regulatory Authority requires electric distribution companies to integrate EV charging load projections into the EV charging load projections for the company's distribution planning. (Reference Connecticut
Integration of Land and Sea in a Port Area: A Case Study of the Port of Koper
NASA Astrophysics Data System (ADS)
Ažman Momirski, Lucija
2017-10-01
The spatial plan for a port based on land reclamation, existing land, or a combination of both should be designed in line with both reliable data for the existing situation and precise goals based on a well-founded vision by the port authority. In ports, human activities are concentrated in the limited space of the coastal belt, where they threaten the vulnerable equilibrium of the environment. Integrated multifunctional planning of ports is necessary for the sustainability of such plans. In this process, the relation between the environment and the economy is often neglected because the ecosystem—the totality of living organisms—which is fully dependent on biological, chemical, and physical factors, prevails. This method, also called building with nature, is the basis for integrated coastal zone development and management. It emphasizes the flexible integration of land and sea, which respects and uses forces and materials present in nature, and which is an essential interaction between man and environment. Strict ecological planning conditions and the public interest obliged the Port of Koper to modify its urban planning strategies and redefine its relationship with all bordering areas. The extension of two piers and construction of a third one was the result of functional factors, infrastructure connections, technical possibilities, and environmental requirements. Solutions that were relevant for distributing cargo on the docks had to adjust to the width of the basins for manoeuvring ships. Various types of construction restrict water flow under piers, thereby accelerating biomass degradation. Environmental aspects created conditions and requirements for pier construction.
SEPAC software configuration control plan and procedures, revision 1
NASA Technical Reports Server (NTRS)
1981-01-01
SEPAC Software Configuration Control Plan and Procedures are presented. The objective of the software configuration control is to establish the process for maintaining configuration control of the SEPAC software beginning with the baselining of SEPAC Flight Software Version 1 and encompass the integration and verification tests through Spacelab Level IV Integration. They are designed to provide a simplified but complete configuration control process. The intent is to require a minimum amount of paperwork but provide total traceability of SEPAC software.
Technology and Environmental Education: An Integrated Curriculum
ERIC Educational Resources Information Center
Willis, Jana M.; Weiser, Brenda
2005-01-01
Preparing teacher candidates to integrate technology into their future classrooms effectively requires experience in instructional planning that utilizes technology to enhance student learning. Teacher candidates need to work with curriculum that supports a variety of technologies. Using Project Learning Tree and environmental education (EE),…
OʼHara, Susan
2014-01-01
Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.
JPL Contamination Control Engineering
NASA Technical Reports Server (NTRS)
Blakkolb, Brian
2013-01-01
JPL has extensive expertise fielding contamination sensitive missions-in house and with our NASA/industry/academic partners.t Development and implementation of performance-driven cleanliness requirements for a wide range missions and payloads - UV-Vis-IR: GALEX, Dawn, Juno, WFPC-II, AIRS, TES, et al - Propulsion, thermal control, robotic sample acquisition systems. Contamination control engineering across the mission life cycle: - System and payload requirements derivation, analysis, and contamination control implementation plans - Hardware Design, Risk trades, Requirements V-V - Assembly, Integration & Test planning and implementation - Launch site operations and launch vehicle/payload integration - Flight ops center dot Personnel on staff have expertise with space materials development and flight experiments. JPL has capabilities and expertise to successfully address contamination issues presented by space and habitable environments. JPL has extensive experience fielding and managing contamination sensitive missions. Excellent working relationship with the aerospace contamination control engineering community/.
A Professional Learning Community Approach to Improving English/Language Arts Instructional Planning
ERIC Educational Resources Information Center
Kotsko, Adrienne
2017-01-01
Simply defined, effective English Language Arts (ELA) instruction is cohesive, integrated, and requires students to think deeply. Creating such instruction is difficult, however, because of insufficient training in instructional planning and the numerous types of curricula teachers must navigate that may not align well. Therefore, new secondary…
The Implications of Service-Learning for Technology Studies.
ERIC Educational Resources Information Center
Folkestad, James E.; Senior, Bolivar A.; DeMirana, Michael A.
2002-01-01
A "toys for tots" service-learning experience integrated into an industrial technology management course required development and planning using a process planning and costing model and work with a variety of stakeholders including an Even-Start learning center. Challenges include the lack of service-learning precedent in technology studies and…
The Role of Communication in Strategic Planning at California Community Colleges
ERIC Educational Resources Information Center
Carvalho Cooley, Linda M.
2017-01-01
Purpose: Community colleges continue to face an ever-changing environment. California Community Colleges are confronted with state initiatives, accountability, and accreditation changes that require integrated planning processes. The purpose of this qualitative study was to describe the role of communication as perceived by community college…
Lesson Plan Using Artistic Ways of Thinking
ERIC Educational Resources Information Center
Miller, Penelope
2011-01-01
Today with teacher cutbacks looming, and more integration units, general teachers might be required to teach the visual arts. Therefore, teachers need a clear definition of the discipline of art and personal exposure to aesthetic experiences. Many references are made to classic art education research. When lesson plan formats are generic it…
Simulation-optimization model for production planning in the blood supply chain.
Osorio, Andres F; Brailsford, Sally C; Smith, Honora K; Forero-Matiz, Sonia P; Camacho-Rodríguez, Bernardo A
2017-12-01
Production planning in the blood supply chain is a challenging task. Many complex factors such as uncertain supply and demand, blood group proportions, shelf life constraints and different collection and production methods have to be taken into account, and thus advanced methodologies are required for decision making. This paper presents an integrated simulation-optimization model to support both strategic and operational decisions in production planning. Discrete-event simulation is used to represent the flows through the supply chain, incorporating collection, production, storing and distribution. On the other hand, an integer linear optimization model running over a rolling planning horizon is used to support daily decisions, such as the required number of donors, collection methods and production planning. This approach is evaluated using real data from a blood center in Colombia. The results show that, using the proposed model, key indicators such as shortages, outdated units, donors required and cost are improved.
Facility effluent monitoring plan for the plutonium uranium extraction facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiegand, D.L.
A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of themore » effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.« less
45 CFR 164.314 - Organizational requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... confidentiality, integrity, and availability of the electronic protected health information that it creates... electronic protected health information on its behalf to the extent necessary to comply with the legal...) Standard: Requirements for group health plans. Except when the only electronic protected health information...
7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering
NASA Technical Reports Server (NTRS)
Housch, Helen; Godfrey, Sally
2011-01-01
The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.
78 FR 32532 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... recordkeeping requirements for integrated debt instruments. Affected Public: Private Sector: Businesses or other... qualified health plans available to individuals and employers. Affected Public: Private Sector: Not-for...: The regulations provide definitions, general rules, and reporting requirements for debt instruments...
NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes
NASA Technical Reports Server (NTRS)
Smith, David A.; Smith, John V.
2010-01-01
The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.
How To Integrate and Manage New Technology in the Library.
ERIC Educational Resources Information Center
Becker, Joseph
1983-01-01
As technology permeates the special library, new requirements will emerge to integrate staff, equipment, and systems and establish connections between information resources and people. Being library managers in special libraries of tomorrow means mastering fundamentals of cost accounting, strategic planning, technological change, and behavioral…
Planning for sustainable community water systems requires a comprehensive understanding and assessment of the integrated source-drinking-wastewater systems over their life-cycles. Although traditional life cycle assessment and similar tools (e.g. footprints and emergy) have been ...
EUROPA2: Plan Database Services for Planning and Scheduling Applications
NASA Technical Reports Server (NTRS)
Bedrax-Weiss, Tania; Frank, Jeremy; Jonsson, Ari; McGann, Conor
2004-01-01
NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.
DeLargy, Pamela; Alakbarov, Ramiz
2004-09-01
The United Nations Population Fund (UNFPA) coordinated efforts to integrate RH into contingency planning for the 2003 Iraq crisis and the 2003 regional response for displaced populations in West Africa. Using UNFPA's network of country offices in the Middle East, staff developed logistics plans, conducted workshops and pre-positioned RH supplies. Though refugee movements did not occur, the contingency planning enhanced the response capacity of UNFPA offices and made it possible to rapidly provide assistance inside Iraq. In West Africa, multi-country workshops and follow-up resulted in country-level and regional action plans useful during the renewed crises of 2003; scarce funding, however, limited their full implementation. UNFPA's experiences show that contingency planning requires committing resources for crises, some of which will not occur; new staff skills; and follow-up. Moreover, RH is considered by some to be additional to the core elements of contingency planning. RH's political sensitivity, particularly with certain donors, further complicated integrated planning.
Cryo-Vacuum Testing of the Integrated Science Instrument Module for the James Webb Space Telescope
NASA Technical Reports Server (NTRS)
Kimble, Randy A.; Davila, P. S.; Drury, M. P.; Glazer, S. D.; Krom, J. R.; Lundquist, R. A.; Mann, S. D.; McGuffey, D. B.; Perry, R. L.; Ramey, D. D.
2011-01-01
With delivery of the science instruments for the James Webb Space Telescope (JWST) to Goddard Space Flight Center (GSFC) expected in 2012, current plans call for the first cryo-vacuum test of the Integrated Science Instrument Module (ISIM) to be carried out at GSFC in early 2013. Plans are well underway for conducting this ambitious test, which will perform critical verifications of a number of optical, thermal, and operational requirements of the IS 1M hardware, at its deep cryogenic operating temperature. We describe here the facilities, goals, methods, and timeline for this important Integration & Test milestone in the JWST program.
Computer integrated manufacturing/processing in the HPI. [Hydrocarbon Processing Industry
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yoshimura, J.S.
1993-05-01
Hydrocarbon Processing and Systemhouse Inc., developed a comprehensive survey on the status of computer integrated manufacturing/processing (CIM/CIP) targeted specifically to the unique requirements of the hydrocarbon processing industry. These types of surveys and other benchmarking techniques can be invaluable in assisting companies to maximize business benefits from technology investments. The survey was organized into 5 major areas: CIM/CIP planning, management perspective, functional applications, integration and technology infrastructure and trends. The CIM/CIP planning area dealt with the use and type of planning methods to plan, justify implement information technology projects. The management perspective section addressed management priorities, expenditure levels and implementationmore » barriers. The functional application area covered virtually all functional areas of organization and focused on the specific solutions and benefits in each of the functional areas. The integration section addressed the needs and integration status of the organization's functional areas. Finally, the technology infrastructure and trends section dealt with specific technologies in use as well as trends over the next three years. In February 1993, summary areas from preliminary results were presented at the 2nd International Conference on Productivity and Quality in the Hydrocarbon Processing Industry.« less
2017-12-21
deterrence approach is capable of exer- cising deterrence with virtual, psychological , moral, and physical aspects in an integrated way, thus lever...Julie Ryan T H E F I F T H D O M A I N Integrating cyber and electronic warfare capabilities increases the commander’s situational awareness. (U.S...cyber organizations and the interagency; and integrating cyber requirements into operational planning and execution. It will take continued
Technology for the future - Long range planning for space technology development
NASA Technical Reports Server (NTRS)
Collier, Lisa D.; Breckenridge, Roger A.; Llewellyn, Charles P.
1992-01-01
NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.
The Imperative to Integrate Air Force Command and Control Systems into Maritime Plans
2014-08-01
coopera- tion with existing C2 plans? Table. Components of C2 systems and plans C2 Systems C2 Plans People Competencies Platforms Technologies Doctrine...Intent Authorities Functions Tasks Effects C2 Systems The requirements for such a system can be expressed in terms of its components: people ...competencies, platforms, technologies, and doc- trine. The people connect to the human elements of war and leverage their particular knowledge and skills that
Design for an integrated discipline operations control center for Space Station Freedom
NASA Technical Reports Server (NTRS)
Haines, Richard F.
1993-01-01
This paper presents selected features of a human factors oriented plan for a Space Station Freedom (SSF) ground Discipline Operations Center (DOC) that is integrated with other work areas used by multidisciplinary life scientists. This combined facility is referred to as an integrated DOC or IDOC. This plan is based upon the assumption that there will be a constantly changing array of specialized equipment and procedures used by life sciences principal investigators (PI) on the ground which must be linked to SSF through various DOC systems. Other sites will also be able to communicate with SSF (Anon., 1992). It is also assumed that cost reduction will be a major design consideration and that one integrated structure will be less expensive to build and operate than two separate ones. Since both the DOC personnel and PIs will need to communicate with the flight crew aboard SSF, the general interconnect architecture of the PIs' communication linkage is considered here. Key human factor design elements of this plan include: a candidate facility layout which accommodates three (3), multipurpose, rapidly reconfigurable work areas (suites) and consequent user traffic flow considerations, a multimedia telecommunications support capability, functional (human) traffic flow, optimized internal illumination and acoustics requirements, selected volumetric and safety requirements, and other architectural design parameters.
Behzadian, Kourosh; Kapelan, Zoran
2015-09-15
Despite providing water-related services as the primary purpose of urban water system (UWS), all relevant activities require capital investments and operational expenditures, consume resources (e.g. materials and chemicals), and may increase negative environmental impacts (e.g. contaminant discharge, emissions to water and air). Performance assessment of such a metabolic system may require developing a holistic approach which encompasses various system elements and criteria. This paper analyses the impact of integration of UWS components on the metabolism based performance assessment for future planning using a number of intervention strategies. It also explores the importance of sustainability based criteria in the assessment of long-term planning. Two assessment approaches analysed here are: (1) planning for only water supply system (WSS) as a part of the UWS and (2) planning for an integrated UWS including potable water, stormwater, wastewater and water recycling. WaterMet(2) model is used to simulate metabolic type processes in the UWS and calculate quantitative performance indicators. The analysis is demonstrated on the problem of strategic level planning of a real-world UWS to where optional intervention strategies are applied. The resulting performance is assessed using the multiple criteria of both conventional and sustainability type; and optional intervention strategies are then ranked using the Compromise Programming method. The results obtained show that the high ranked intervention strategies in the integrated UWS are those supporting both water supply and stormwater/wastewater subsystems (e.g. rainwater harvesting and greywater recycling schemes) whilst these strategies are ranked low in the WSS and those targeting improvement of water supply components only (e.g. rehabilitation of clean water pipes and addition of new water resources) are preferred instead. Results also demonstrate that both conventional and sustainability type performance indicators are necessary for strategic planning in the UWS. Copyright © 2015 Elsevier B.V. All rights reserved.
Integrated assessment and consultation for the preoperative patient.
Silverman, David G; Rosenbaum, Stanley H
2009-12-01
Assessment of the presurgical patient requires interdisciplinary cooperation over the continuum of documentation and optimization of existing disorders, determination of patient resilience and reserve, and planning for subsequent interventions and care. For many patients, evident or suspected morbidities or anticipated surgical disturbance warrant specialty consultation. There may be uncertainty as to the optimal processes for a given patient, a limitation attributable to myriad factors, not the least of which is that there is often a paucity of evidence that is directly relevant to a given patient in a given setting. The present article discusses these limitations and describes a framework for documentation, optimization, risk assessment, and planning, as well as a uniform grading of existing morbidities and anticipated perioperative disturbances for patients requiring integrated assessment and consultation.
Integrated assessment and consultation for the preoperative patient.
Silverman, David G; Rosenbaum, Stanley H
2009-09-01
Assessment of the presurgical patient requires interdisciplinary cooperation over the continuum of documentation and optimization of existing disorders, determination of patient resilience and reserve, and planning for subsequent interventions and care. For many patients, evident or suspected morbidities or anticipated surgical disturbance warrant specialty consultation. There may be uncertainty as to the optimal processes for a given patient, a limitation attributable to myriad factors, not the least of which is that there is often a paucity of evidence that is directly relevant to a given patient in a given setting. The present article discusses these limitations and describes a framework for documentation, optimization, risk assessment, and planning, as well as a uniform grading of existing morbidities and anticipated perioperative disturbances for patients requiring integrated assessment and consultation.
DOT National Transportation Integrated Search
1998-09-16
One of the new requirements of the Intermodal Surface Transportation Efficiency Act of 1991 is the requirement that State Departments of Transportation, Metropolitan Planning Organizations, and transit operators conduct a major investment study (MIS)...
33 CFR 155.4030 - Required salvage and marine firefighting services to list in response plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
... listed in the table in § 155.4030(b) will apply to these services. (c) Integration into the response... offload the vessel's largest cargo tank in 24 hours of continuous operation. This is required for both...
Air & Space Power Journal. Volume 18, Number 2, Summer 2004
2004-06-01
those areas for as long as required. To gether, global access and global presence are the essence of space power.50 Third , space power is...how the US military organizes, trains, plans, and fights. And we must integrate space power accordingly. Third , space power must be integrated
ERIC Educational Resources Information Center
Downing, John H.; Lander, Jeffrey E.
1997-01-01
Integrating physical training with physics concepts gives teachers increased opportunities for exploration, problem solving, and concept application, while providing an additional medium for cooperative learning and mutual understanding of each others' goals and objectives. An interdisciplinary model requires alternative planning and preparation…
Maintaining Pedagogical Integrity of a Computer Mediated Course Delivery in Social Foundations
ERIC Educational Resources Information Center
Stewart, Shelley; Cobb-Roberts, Deirdre; Shircliffe, Barbara J.
2013-01-01
Transforming a face to face course to a computer mediated format in social foundations (interdisciplinary field in education), while maintaining pedagogical integrity, involves strategic collaboration between instructional technologists and content area experts. This type of planned partnership requires open dialogue and a mutual respect for prior…
DOE Office of Scientific and Technical Information (OSTI.GOV)
CARTER, R.P.
1999-11-19
The U.S. Department of Energy (DOE) commits to accomplishing its mission safely. To ensure this objective is met, DOE issued DOE P 450.4, Safety Management System Policy, and incorporated safety management into the DOE Acquisition Regulations ([DEAR] 48 CFR 970.5204-2 and 90.5204-78). Integrated Safety Management (ISM) requires contractors to integrate safety into management and work practices at all levels so that missions are achieved while protecting the public, the worker, and the environment. The contractor is required to describe the Integrated Safety Management System (ISMS) to be used to implement the safety performance objective.
[Integration of the radiotherapy irradiation planning in the digital workflow].
Röhner, F; Schmucker, M; Henne, K; Momm, F; Bruggmoser, G; Grosu, A-L; Frommhold, H; Heinemann, F E
2013-02-01
At the Clinic of Radiotherapy at the University Hospital Freiburg, all relevant workflow is paperless. After implementing the Operating Schedule System (OSS) as a framework, all processes are being implemented into the departmental system MOSAIQ. Designing a digital workflow for radiotherapy irradiation planning is a large challenge, it requires interdisciplinary expertise and therefore the interfaces between the professions also have to be interdisciplinary. For every single step of radiotherapy irradiation planning, distinct responsibilities have to be defined and documented. All aspects of digital storage, backup and long-term availability of data were considered and have already been realized during the OSS project. After an analysis of the complete workflow and the statutory requirements, a detailed project plan was designed. In an interdisciplinary workgroup, problems were discussed and a detailed flowchart was developed. The new functionalities were implemented in a testing environment by the Clinical and Administrative IT Department (CAI). After extensive tests they were integrated into the new modular department system. The Clinic of Radiotherapy succeeded in realizing a completely digital workflow for radiotherapy irradiation planning. During the testing phase, our digital workflow was examined and afterwards was approved by the responsible authority.
DOE Office of Scientific and Technical Information (OSTI.GOV)
He Jia; Bao Cunkuan, E-mail: baock@tongji.edu.cn; Shu Tingfei
2011-11-15
Sustainable development or sustainability has been highlighted as an essential principle in urban master planning, with increasing recognition that uncontrollable urbanization may well give rise to various issues such as overexploitation of natural resources, ecosystem destruction, environmental pollution and large-scale climate change. Thus, it is deemed necessary to modify the existing urban and regional administrative system so as to cope with the challenges urban planning is being confronted with and realize the purpose of urban sustainability. This paper contributed to proposing a mechanism which helps to make urban planning with full consideration of issues with respect to sustainable development. Wemore » suggested that the integration of urban planning, SEA and ecological planning be a multi-win strategy to offset deficiency of each mentioned political tool being individually applied. We also proposed a framework where SEA and ecological planning are fully incorporated into urban planning, which forms a two-way constraint mechanism to ascertain environmental quality of urban planning, although in practice, planning and SEA processes may conditionally be unified. Moreover, as shown in the case study, the integration of the three political tools may be constrained due to slow changes in the contextual factors, in particular the political and cultural dimensions. Currently within the context of China, there may be three major elements which facilitate integration of the three political tools, which are (1) regulatory requirement of PEIA on urban planning, (2) the promotion or strong administrative support from government on eco-district building, and (3) the willingness of urban planners to collaborate with SEA experts or ecologists.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... available in mixed-income, integrated communities. In addition, HUD will require that this new affordable... fair housing marketing plan satisfactory to HUD for both the market-rate units and the units that will... (a satisfactory affirmative fair housing marketing plan must include marketing of affordable units to...
ERIC Educational Resources Information Center
Saa'd AlDin, Kawther
2014-01-01
In 2010, the International Baccalaureate (IB) Organization mandated that all its schools, including Diploma (DP) schools, adhere to the collaborative planning and reflection requirements, which emphasized the importance of integrating its theory of knowledge (TOK) core component into all disciplines. Many schools officials and educations in Amman…
Armored Family of Vehicles (AFV). Phase 1 Report. Book 7. Volume 11
1987-08-31
Armored Family of Vehicles. Specific requirements and products are described which initiate the training development process and a training management ...approach for the TRADOC and proponent schools to plan, develop, manage and integrate the training subsystem(s) for the Armored Family of Vehicles...Procedures. q. Charter, Armored Family of Vehicles. r. Operational and Organizational (O&W) Plan for AFV. s. System MANPRINT Management Plan for AFV
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.; McNair, Ann R. (Technical Monitor)
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The "pieces" are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Technical Reports Server (NTRS)
Maxwell, Theresa G.
2002-01-01
The planning processes for the International Space Station (ISS) Program are quite complex. Detailed mission planning for ISS on-orbit operations is a distributed function. Pieces of the on-orbit plan are developed by multiple planning organizations, located around the world, based on their respective expertise and responsibilities. The pieces are then integrated to yield the final detailed plan that will be executed onboard the ISS. Previous space programs have not distributed the planning and scheduling functions to this extent. Major ISS planning organizations are currently located in the United States (at both the NASA Johnson Space Center (JSC) and NASA Marshall Space Flight Center (MSFC)), in Russia, in Europe, and in Japan. Software systems have been developed by each of these planning organizations to support their assigned planning and scheduling functions. Although there is some cooperative development and sharing of key software components, each planning system has been tailored to meet the unique requirements and operational environment of the facility in which it operates. However, all the systems must operate in a coordinated fashion in order to effectively and efficiently produce a single integrated plan of ISS operations, in accordance with the established planning processes. This paper addresses lessons learned during the development of these multiple distributed planning systems, from the perspective of the developer of one of the software systems. The lessons focus on the coordination required to allow the multiple systems to operate together, rather than on the problems associated with the development of any particular system. Included in the paper is a discussion of typical problems faced during the development and coordination process, such as incompatible development schedules, difficulties in defining system interfaces, technical coordination and funding for shared tools, continually evolving planning concepts/requirements, programmatic and budget issues, and external influences. Techniques that mitigated some of these problems will also be addressed, along with recommendations for any future programs involving the development of multiple planning and scheduling systems. Many of these lessons learned are not unique to the area of planning and scheduling systems, so may be applied to other distributed ground systems that must operate in concert to successfully support space mission operations.
NASA Astrophysics Data System (ADS)
York, Andrew M.
2000-11-01
The ever increasing sophistication of reconnaissance sensors reinforces the importance of timely, accurate, and equally sophisticated mission planning capabilities. Precision targeting and zero-tolerance for collateral damage and civilian casualties, stress the need for accuracy and timeliness. Recent events have highlighted the need for improvement in current planning procedures and systems. Annotating printed maps takes time and does not allow flexibility for rapid changes required in today's conflicts. We must give aircrew the ability to accurately navigate their aircraft to an area of interest, correctly position the sensor to obtain the required sensor coverage, adapt missions as required, and ensure mission success. The growth in automated mission planning system capability and the expansion of those systems to include dedicated and integrated reconnaissance modules, helps to overcome current limitations. Mission planning systems, coupled with extensive integrated visualization capabilities, allow aircrew to not only plan accurately and quickly, but know precisely when they will locate the target and visualize what the sensor will see during its operation. This paper will provide a broad overview of the current capabilities and describe how automated mission planning and visualization systems can improve and enhance the reconnaissance planning process and contribute to mission success. Think about the ultimate objective of the reconnaissance mission as we consider areas that technology can offer improvement. As we briefly review the fundamentals, remember where and how TAC RECCE systems will be used. Try to put yourself in the mindset of those who are on the front lines, working long hours at increasingly demanding tasks, trying to become familiar with new operating areas and equipment, while striving to minimize risk and optimize mission success. Technical advancements that can reduce the TAC RECCE timeline, simplify operations and instill Warfighter confidence, ultimately improve the desired outcome.
Surface-Water Quality-Assurance Plan for the Tallahassee Office, U.S. Geological Survey
Tomlinson, Stewart A.
2006-01-01
This Tallahassee Office Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the Tallahassee Office for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all Tallahassee Office personnel involved in surface-water data activities, and changes as the needs and requirements of the Tallahassee Office, Florida Integrated Science Center, and Water Discipline change. Reg-ular updates to this Plan represent an integral part of the quality-assurance process. In the Tallahassee Office, direct oversight and responsibility by the employee(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure high-quality data, analyses, reviews, and reports for cooperating agencies and the public.
Development of a plan for automating integrated circuit processing
NASA Technical Reports Server (NTRS)
1971-01-01
The operations analysis and equipment evaluations pertinent to the design of an automated production facility capable of manufacturing beam-lead CMOS integrated circuits are reported. The overall plan shows approximate cost of major equipment, production rate and performance capability, flexibility, and special maintenance requirements. Direct computer control is compared with supervisory-mode operations. The plan is limited to wafer processing operations from the starting wafer to the finished beam-lead die after separation etching. The work already accomplished in implementing various automation schemes, and the type of equipment which can be found for instant automation are described. The plan is general, so that small shops or large production units can perhaps benefit. Examples of major types of automated processing machines are shown to illustrate the general concepts of automated wafer processing.
Reliability program requirements for aeronautical and space system contractors
NASA Technical Reports Server (NTRS)
1987-01-01
General reliability program requirements for NASA contracts involving the design, development, fabrication, test, and/or use of aeronautical and space systems including critical ground support equipment are prescribed. The reliability program requirements require (1) thorough planning and effective management of the reliability effort; (2) definition of the major reliability tasks and their place as an integral part of the design and development process; (3) planning and evaluating the reliability of the system and its elements (including effects of software interfaces) through a program of analysis, review, and test; and (4) timely status indication by formal documentation and other reporting to facilitate control of the reliability program.
NASA Astrophysics Data System (ADS)
Florkowska, Lucyna; Bryt-Nitarska, Izabela
2018-04-01
The notion of Integrated Territorial Investments (ITI) appears more and more frequently in contemporary regional development strategies. Formulating the main assumptions of ITI is a response to a growing need for a co-ordinated, multi-dimensional regional development suitable for the characteristics of a given area. Activities are mainly aimed at improving people's quality of life with their significant participation. These activities include implementing the Sustainable development Goals (SDGs). Territorial investments include, among others, projects in areas where land and building use is governed not only by general regulations (Spatial Planning and Land Development Act) but also by separate legal acts. This issue also concerns areas with active mines and post-mining areas undergoing revitalization. For the areas specified above land development and in particular making building investments is subject to the requirements set forth in the Geological and Mining Law and in the general regulations. In practice this means that factors connected with the present and future mining impacts must be taken into consideration in planning the investment process. This article discusses the role of proper assessment of local geological conditions as well as the current and future mining situation in the context of proper planning and performance of the Integrated Territorial Investment programme and also in the context of implementing the SDGs. It also describes the technical and legislative factors which need to be taken into consideration in areas where mining is planned or where it took place in the past.
Theresa K. Burcsu; Joshua S. Halofsky; Simon A. Bisrat; Treg A. Christopher; Megan K. Creutzburg; Emilie B. Henderson; Miles A. Hemstrom; F. Jack Triepke; Melissa Whitman
2014-01-01
Land management planning at broad scales requires integrative techniques to understand and synthesize the effects of different land management activities and address socioeconomic and conservation concerns. The Integrated Landscape Assessment Project was developed to support the vital but complex task of broadscale integration of information to assess ecological...
GPS/INS integration by functional partitioning
NASA Astrophysics Data System (ADS)
Diesel, John W.
It is shown that a GPS/INS system integrated by functional partitioning can satisfy all of the RTCA navigation requirements and goals. This is accomplished by accurately calibrating the INS using GPS after the inertial instruments are thermally stabilized and by exploiting the very slow subsequent error growth in the INS information. In this way, autonomous integrity monitoring can be achieved using only existing or presently planned systems.
Performance evaluation of the NASA/KSC CAD/CAE and office automation LAN's
NASA Technical Reports Server (NTRS)
Zobrist, George W.
1994-01-01
This study's objective is the performance evaluation of the existing CAD/CAE (Computer Aided Design/Computer Aided Engineering) network at NASA/KSC. This evaluation also includes a similar study of the Office Automation network, since it is being planned to integrate this network into the CAD/CAE network. The Microsoft mail facility which is presently on the CAD/CAE network was monitored to determine its present usage. This performance evaluation of the various networks will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the CAD/CAE network and determining the effectiveness of the planned FDDI (Fiber Distributed Data Interface) migration.
40 CFR 233.31 - Coordination requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... discharge may affect the biological, chemical, or physical integrity of the waters of any State(s) other... coordinated with Federal and Federal-State water related planning and review processes. ...
International Space Station Configuration Analysis and Integration
NASA Technical Reports Server (NTRS)
Anchondo, Rebekah
2016-01-01
Ambitious engineering projects, such as NASA's International Space Station (ISS), require dependable modeling, analysis, visualization, and robotics to ensure that complex mission strategies are carried out cost effectively, sustainably, and safely. Learn how Booz Allen Hamilton's Modeling, Analysis, Visualization, and Robotics Integration Center (MAVRIC) team performs engineering analysis of the ISS Configuration based primarily on the use of 3D CAD models. To support mission planning and execution, the team tracks the configuration of ISS and maintains configuration requirements to ensure operational goals are met. The MAVRIC team performs multi-disciplinary integration and trade studies to ensure future configurations meet stakeholder needs.
Some aspects of inventory integration
Jerry Leech
2000-01-01
Integrating such disparate topics as are covered by this conference is daunting, because to do it well requires in-depth expertise of many complex technical methodologies. Based on experiences in Asia and Australia, it is suggested that there can never be one inventory design or one planning system, it will increasingly be necessary to implement specialized inventories...
26 CFR 1.410(b)-1 - Minimum coverage requirements (before 1994).
Code of Federal Regulations, 2010 CFR
2010-04-01
....410(b)-1(b)(2). (6) Integration with Social Security Act. See section 401(a)(5) and the regulations thereunder for rules relating to integration of plans with the Social Security Act. (7) Different age and..., all the employees of corporations or trades and businesses whose employees are treated as employed by...
The Value of ERP Curriculum Integration: Perspectives from the Research
ERIC Educational Resources Information Center
Hepner, Michelle; Dickson, Warren
2013-01-01
In the current economic conditions, many institutions face dwindling budgets and an increased focus on proving the value of the education provided. The effort and costs required to integrate Enterprise Resource Planning systems into course curricula are a significant investment of resources for any university. This paper examines the expense of…
ERIC Educational Resources Information Center
Hutchison, Amy C.; Woodward, Lindsay
2018-01-01
Background: Presently, models of professional development aimed at supporting teachers' technology integration efforts are often short and decontextualized. With many schools across the country utilizing standards that require students to engage with digital tools, a situative model that supports building teachers' knowledge within their…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
...] Notice of Availability of Record of Decision for the National Petroleum Reserve-Alaska Final Integrated... National Petroleum Reserve in Alaska (NPR-A) Final Integrated Activity Plan (IAP). The Secretary of the... required by the Naval Petroleum Reserves Production Act, as amended, and for application for onshore...
Integrating Career Development into the Accounting Curriculum
ERIC Educational Resources Information Center
Wessels, Susan B.; Sumner, Dana F.
2014-01-01
This paper describes a series of integrated career development activities offered in several required courses which are designed to help accounting majors gain a competitive edge in the job market. Supported by a partnership between the School of Business and the Academic and Career Planning Office, the Career Tool Kit program consists of…
10 CFR 37.43 - General security program requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... overall security strategy to ensure the integrated and effective functioning of the security program required by this subpart. The security plan must, at a minimum: (i) Describe the measures and strategies... lessons learned; (iii) Relevant results of NRC inspections; and (iv) Relevant results of the licensee's...
Integrated network architecture for sustained human and robotic exploration
NASA Technical Reports Server (NTRS)
Noreen, Gary K.; Cesarone, Robert; Deutsch, Leslie; Edwards, Charlie; Soloff, Jason; Ely, Todd; Cook, Brian; Morabito, David; Hemmati, Hamid; Piazzolla, Sabino;
2005-01-01
The National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate is planning a series of human and robotic missions to the Earth's moon and to Mars. These missions will require telecommunication and navigation services. This paper sets forth presumed requirements for such services and presents strawman lunar and Mars telecommunications network architectures to satisfy the presumed requirements.
A Planning Approach of Engineering Characteristics Based on QFD-TRIZ Integrated
NASA Astrophysics Data System (ADS)
Liu, Shang; Shi, Dongyan; Zhang, Ying
Traditional QFD planning method compromises contradictions between engineering characteristics to achieve higher customer satisfaction. However, this compromise trade-off can not eliminate the contradictions existing among the engineering characteristics which limited the overall customer satisfaction. QFD (Quality function deployment) integrated with TRIZ (the Russian acronym of the Theory of Inventive Problem Solving) becomes hot research recently for TRIZ can be used to solve contradictions between engineering characteristics which construct the roof of HOQ (House of quality). But, the traditional QFD planning approach is not suitable for QFD integrated with TRIZ for that TRIZ requires emphasizing the contradictions between engineering characteristics at problem definition stage instead of compromising trade-off. So, a new planning approach based on QFD / TRIZ integration is proposed in this paper, which based on the consideration of the correlation matrix of engineering characteristics and customer satisfaction on the basis of cost. The proposed approach suggests that TRIZ should be applied to solve contradictions at the first step, and the correlation matrix of engineering characteristics should be amended at the second step, and at next step IFR (ideal final result) must be validated, then planning execute. An example is used to illustrate the proposed approach. The application indicated that higher customer satisfaction can be met and the contradictions between the characteristic parameters are eliminated.
49 CFR 1106.6 - Reservation of Jurisdiction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL... those enumerated in this part, or to adopt modified SIP requirements in individual cases, if it...
49 CFR 1106.6 - Reservation of Jurisdiction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL... those enumerated in this part, or to adopt modified SIP requirements in individual cases, if it...
49 CFR 1106.6 - Reservation of Jurisdiction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL... those enumerated in this part, or to adopt modified SIP requirements in individual cases, if it...
49 CFR 1106.6 - Reservation of Jurisdiction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL... those enumerated in this part, or to adopt modified SIP requirements in individual cases, if it...
49 CFR 1106.6 - Reservation of Jurisdiction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL... those enumerated in this part, or to adopt modified SIP requirements in individual cases, if it...
Dubois, Eline Agnès; Franson, Kari Lanette
2009-09-01
Basic sciences can be integrated into the medical school curriculum via e-learning. The process of integrating a basic science in this manner resembles a curricular change. The change usually begins with an idea for using e-learning to teach a basic science and establishing the need for the innovation. In the planning phase, learning outcomes are formulated and a prototype of the program is developed based on the desired requirements. A realistic concept is formed after considering the limitations of the current institute. Next, a project team is assembled to develop the program and plan its integration. Incorporation of the e-learning program is facilitated by a well-developed and communicated integration plan. Various course coordinators are contacted to determine content of the e-learning program as well as establish assessment. Linking the e-learning program to existing course activities and thereby applying the basic science into the clinical context enhances the degree of integration. The success of the integration is demonstrated by a positive assessment of the program including favourable cost-benefit analysis and improved student performance. Lastly, when the program becomes institutionalised, continuously updating content and technology (when appropriate), and evaluating the integration contribute to the prolonged survival of the e-learning program.
Determination of Pre-Service Classroom Teachers' Technological Pedagogical Content Knowledge
ERIC Educational Resources Information Center
Can, Sendil; Dogru, Serpil; Bayir, Gülsu
2017-01-01
It seems to be a must for teachers and pre-service teachers to have information and skills necessary for the use of technology in education. This requires effective planning of how technology should be integrated into the teacher training curriculums of education faculties and continuous revision of this plan. In this regard, the purpose of the…
40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit as defined under... that combust fuels made from products of plastics/rubber recycling plants. Units are exempt from your...
40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit as defined under... that combust fuels made from products of plastics/rubber recycling plants. Units are exempt from your...
40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit as defined under... that combust fuels made from products of plastics/rubber recycling plants. Units are exempt from your...
40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit as defined under... that combust fuels made from products of plastics/rubber recycling plants. Units are exempt from your...
40 CFR 60.1555 - Are any small municipal waste combustion units exempt from my State plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
.../rubber recycling units. Units are exempt from your State plan if four requirements are met: (1) The pyrolysis/combustion unit is an integrated part of a plastics/rubber recycling unit as defined under... that combust fuels made from products of plastics/rubber recycling plants. Units are exempt from your...
Toward a space materials systems program
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G. F.
1981-01-01
A program implementation model is presented which covers the early stages of space material processing and manufacturing. The model includes descriptions of major program elements, development and experiment requirements in space materials processing and manufacturing, and an integration of the model into NASA's long range plans as well as its evolution from present Materials Processing in Space plans.
1977-01-01
services . He is the integrated material manager for bulk petroleum products and performs contract administration overseas. The Chief of Naval Operations...technologies with other requirements ( health . safety, environmental protection, and economic regulation). Federal Energy Administration FEA was established in...Naval Oil Shale Reserve No. 3 (Colorado No. 2) ........... .. 5-4 5.3 Administration or the Reserves ........................... 5-4 5.4 Future Plans
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Integrated Modeling, Mapping, and Simulation (IMMS) Framework for Exercise and Response Planning
NASA Technical Reports Server (NTRS)
Mapar, Jalal; Hoette, Trisha; Mahrous, Karim; Pancerella, Carmen M.; Plantenga, Todd; Yang, Christine; Yang, Lynn; Hopmeier, Michael
2011-01-01
EmergenCy management personnel at federal, stale, and local levels can benefit from the increased situational awareness and operational efficiency afforded by simulation and modeling for emergency preparedness, including planning, training and exercises. To support this goal, the Department of Homeland Security's Science & Technology Directorate is funding the Integrated Modeling, Mapping, and Simulation (IMMS) program to create an integrating framework that brings together diverse models for use by the emergency response community. SUMMIT, one piece of the IMMS program, is the initial software framework that connects users such as emergency planners and exercise developers with modeling resources, bridging the gap in expertise and technical skills between these two communities. SUMMIT was recently deployed to support exercise planning for National Level Exercise 2010. Threat, casualty. infrastructure, and medical surge models were combined within SUMMIT to estimate health care resource requirements for the exercise ground truth.
Integrated Data & Analysis in Support of Informed and Transparent Decision Making
NASA Astrophysics Data System (ADS)
Guivetchi, K.
2012-12-01
The California Water Plan includes a framework for improving water reliability, environmental stewardship, and economic stability through two initiatives - integrated regional water management to make better use of local water sources by integrating multiple aspects of managing water and related resources; and maintaining and improving statewide water management systems. The Water Plan promotes ways to develop a common approach for data standards and for understanding, evaluating, and improving regional and statewide water management systems, and for common ways to evaluate and select from alternative management strategies and projects. The California Water Plan acknowledges that planning for the future is uncertain and that change will continue to occur. It is not possible to know for certain how population growth, land use decisions, water demand patterns, environmental conditions, the climate, and many other factors that affect water use and supply may change by 2050. To anticipate change, our approach to water management and planning for the future needs to consider and quantify uncertainty, risk, and sustainability. There is a critical need for information sharing and information management to support over-arching and long-term water policy decisions that cross-cut multiple programs across many organizations and provide a common and transparent understanding of water problems and solutions. Achieving integrated water management with multiple benefits requires a transparent description of dynamic linkages between water supply, flood management, water quality, land use, environmental water, and many other factors. Water Plan Update 2013 will include an analytical roadmap for improving data, analytical tools, and decision-support to advance integrated water management at statewide and regional scales. It will include recommendations for linking collaborative processes with technical enhancements, providing effective analytical tools, and improving and sharing data and information. Specifically, this includes achieving better integration and consistency with other planning activities; obtaining consensus on quantitative deliverables; building a common conceptual understanding of the water management system; developing common schematics of the water management system; establishing modeling protocols and standards; and improving transparency and exchange of Water Plan information.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Becker, G.K.
1997-01-01
Bio-Imaging Research Inc. (BIR) and Lockheed Martin Speciality Components (LMSC) are engaged in a Program Research and Development Agreement and a Rapid Commercialization Initiative with the Department of Energy, EM-50. The agreement required BIR and LMSC to develop a data interpretation method that merges nondestructive assay and nondestructive examination (NDA/NDE) data and information sufficient to establish compliance with applicable National TRU Program (Program) waste characterization requirements and associated quality assurance performance criteria. This effort required an objective demonstration of the BIR and LMSC waste characterization systems in their standalone and integrated configurations. The goal of the test plan is tomore » provide a mechanism from which evidence can be derived to substantiate nondestructive assay capability and utility statement for the BIT and LMSC systems. The plan must provide for the acquisition, compilation, and reporting of performance data thereby allowing external independent agencies a basis for an objective evaluation of the standalone BIR and LMSC measurement systems, WIT and APNEA respectively, as well as an expected performance resulting from appropriate integration of the two systems. The evaluation is to be structured such that a statement regarding select INEL RWMC waste forms can be made in terms of compliance with applicable Program requirements and criteria.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Achieving Maximum Integration Utilizing Requirements Flow Down
NASA Technical Reports Server (NTRS)
Archiable, Wes; Askins, Bruce
2011-01-01
A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.
Integrated controls and health monitoring for chemical transfer propulsion
NASA Technical Reports Server (NTRS)
Millis, Marc G.; Binder, Michael P.
1990-01-01
NASA is reviewing various propulsion technologies for exploring space. The requirements are examined for one enabling propulsion technology: Integrated Controls and Health Monitoring (ICHM) for Chemical Transfer Propulsion (CTP). Functional requirements for a CTP-ICHM system are proposed from tentative mission scenarios, vehicle configurations, CTP specifications, and technical feasibility. These CTP-ICHM requirements go beyond traditional reliable operation and emergency shutoff control to include: (1) enhanced mission flexibility; (2) continuously variable throttling; (3) tank-head start control; (4) automated prestart and post-shutoff engine check; (5) monitoring of space exposure degradation; and (6) product evolution flexibility. Technology development plans are also discussed.
Code of Federal Regulations, 2012 CFR
2012-10-01
... list of applicable requirements and providing it to the contracting officer for inclusion in the..., Integration of Environment, Safety, and Health into Work Planning and Execution. When such a process is used...
Code of Federal Regulations, 2013 CFR
2013-07-01
... integration of environmental considerations into planning and decision-making. (b) This part requires... which the Army is the DOD executive agent. It does not apply to Civil Works functions of the US Army...
Code of Federal Regulations, 2014 CFR
2014-07-01
... integration of environmental considerations into planning and decision-making. (b) This part requires... which the Army is the DOD executive agent. It does not apply to Civil Works functions of the US Army...
Code of Federal Regulations, 2012 CFR
2012-07-01
... integration of environmental considerations into planning and decision-making. (b) This part requires... which the Army is the DOD executive agent. It does not apply to Civil Works functions of the US Army...
Code of Federal Regulations, 2011 CFR
2011-07-01
... integration of environmental considerations into planning and decision-making. (b) This part requires... which the Army is the DOD executive agent. It does not apply to Civil Works functions of the US Army...
Automated planning of MRI scans of knee joints
NASA Astrophysics Data System (ADS)
Bystrov, Daniel; Pekar, Vladimir; Young, Stewart; Dries, Sebastian P. M.; Heese, Harald S.; van Muiswinkel, Arianne M.
2007-03-01
A novel and robust method for automatic scan planning of MRI examinations of knee joints is presented. Clinical knee examinations require acquisition of a 'scout' image, in which the operator manually specifies the scan volume orientations (off-centres, angulations, field-of-view) for the subsequent diagnostic scans. This planning task is time-consuming and requires skilled operators. The proposed automated planning system determines orientations for the diagnostic scan by using a set of anatomical landmarks derived by adapting active shape models of the femur, patella and tibia to the acquired scout images. The expert knowledge required to position scan geometries is learned from previous manually planned scans, allowing individual preferences to be taken into account. The system is able to automatically discriminate between left and right knees. This allows to use and merge training data from both left and right knees, and to automatically transform all learned scan geometries to the side for which a plan is required, providing a convenient integration of the automated scan planning system in the clinical routine. Assessment of the method on the basis of 88 images from 31 different individuals, exhibiting strong anatomical and positional variability demonstrates success, robustness and efficiency of all parts of the proposed approach, which thus has the potential to significantly improve the clinical workflow.
Discharge planning in mental health care: an integrative review of the literature.
Nurjannah, Intansari; Mills, Jane; Usher, Kim; Park, Tanya
2014-05-01
To identify the evidence base related to discharge planning in the context of acute and community mental healthcare service provision to ascertain the need for future research. Discharge planning is an important activity when preparing consumers to transition from hospital to home. The efficiency of discharge planning for consumers living with a mental health issue can influence both the number of future readmissions to acute-care facilities and their quality of life at home. An integrative review of the peer-reviewed literature. This review uses specific search terms and a 21-year time frame to search two key nursing databases CINAHL (Cinahl Information Systems, Glendale, CA, USA) and PSYCHINFO (American Psychological Association, Washington, DC, USA) for research reports investigating the substantive area of enquiry. Hand searches of reference lists and author searches were also conducted. Nineteen peer-reviewed journal articles met the inclusion criteria for this review. Research findings about discharge planning for people living with a mental health issue identify the importance of communication between health professionals, consumers and their families to maximise the effectiveness of this process. The complexity of consumer's healthcare needs influences the discharge planning process and impacts on aftercare compliance and readmission rates. There is a limited amount of research findings relating to differences between health professionals and families' perceptions of the level of information required for effective discharge planning, and the appropriate level of involvement of individuals living with a mental health issue in their own discharge planning. Results from this integrative review will inform future research related to this topic. Discharge planning for consumers living with a mental health issue involves many stakeholders who have different expectations regarding the type of information required and the necessary level of involvement of people living with a mental health issue in this process. Comprehensive discharge planning can result in reduced readmissions to both acute and community mental health services. Understanding the impact of effective communication on the outcomes of discharge planning is an important step in promoting success. © 2013 John Wiley & Sons Ltd.
NASA Technical Reports Server (NTRS)
Chien, Steve; Rabideau, Gregg; Tran, Daniel; Knight, Russell; Chouinard, Caroline; Estlin, Tara; Gaines, Daniel; Clement, Bradley; Barrett, Anthony
2007-01-01
CASPER is designed to perform automated planning of interdependent activities within a system subject to requirements, constraints, and limitations on resources. In contradistinction to the traditional concept of batch planning followed by execution, CASPER implements a concept of continuous planning and replanning in response to unanticipated changes (including failures), integrated with execution. Improvements over other, similar software that have been incorporated into CASPER version 2.0 include an enhanced executable interface to facilitate integration with a wide range of execution software systems and supporting software libraries; features to support execution while reasoning about urgency, importance, and impending deadlines; features that enable accommodation to a wide range of computing environments that include various central processing units and random- access-memory capacities; and improved generic time-server and time-control features.
Conceptual design of an orbital propellant transfer experiment. Volume 2: Study results
NASA Technical Reports Server (NTRS)
Drake, G. L.; Bassett, C. E.; Merino, F.; Siden, L. E.; Bradley, R. E.; Carr, E. J.; Parker, R. E.
1980-01-01
The OTV configurations, operations and requirements planned for the period from the 1980's to the 1990's were reviewed and a propellant transfer experiment was designed that would support the needs of these advanced OTV operational concepts. An overall integrated propellant management technology plan for all NASA centers was developed. The preliminary cost estimate (for planning purposes only) is $56.7 M, of which approximately $31.8 M is for shuttle user costs.
Shuttle program. STS-7 feasibility assessment: IUS/TDRS-A
NASA Technical Reports Server (NTRS)
1979-01-01
This Space Transportation System 7 (STS-7) Flight Feasibility Assessment (FFA) provides a base from which the various design, operation, and integration elements associated with Tracking and Data Relay Satellite-A can perform mission planning and analysis. The STS-7 FFA identifies conflicts, issues, and concerns associated with the integrated flight design requirements and constraints.
Anonymization of DICOM Electronic Medical Records for Radiation Therapy
Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui
2014-01-01
Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1 minute per patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. PMID:25147130
Anonymization of DICOM electronic medical records for radiation therapy.
Newhauser, Wayne; Jones, Timothy; Swerdloff, Stuart; Newhauser, Warren; Cilia, Mark; Carver, Robert; Halloran, Andy; Zhang, Rui
2014-10-01
Electronic medical records (EMR) and treatment plans are used in research on patient outcomes and radiation effects. In many situations researchers must remove protected health information (PHI) from EMRs. The literature contains several studies describing the anonymization of generic Digital Imaging and Communication in Medicine (DICOM) files and DICOM image sets but no publications were found that discuss the anonymization of DICOM radiation therapy plans, a key component of an EMR in a cancer clinic. In addition to this we were unable to find a commercial software tool that met the minimum requirements for anonymization and preservation of data integrity for radiation therapy research. The purpose of this study was to develop a prototype software code to meet the requirements for the anonymization of radiation therapy treatment plans and to develop a way to validate that code and demonstrate that it properly anonymized treatment plans and preserved data integrity. We extended an open-source code to process all relevant PHI and to allow for the automatic anonymization of multiple EMRs. The prototype code successfully anonymized multiple treatment plans in less than 1min/patient. We also tested commercial optical character recognition (OCR) algorithms for the detection of burned-in text on the images, but they were unable to reliably recognize text. In addition, we developed and tested an image filtering algorithm that allowed us to isolate and redact alpha-numeric text from a test radiograph. Validation tests verified that PHI was anonymized and data integrity, such as the relationship between DICOM unique identifiers (UID) was preserved. Copyright © 2014 Elsevier Ltd. All rights reserved.
Kumar, Vikas; Rouquette, J R; Lerner, David N
2013-12-15
Sustainability Appraisal (SA) is a complex task that involves integration of social, environmental and economic considerations and often requires trade-offs between multiple stakeholders that may not easily be brought to consensus. Classical SA, often compartmentalised in the rigid boundary of disciplines, can facilitate discussion, but can only partially inform decision makers as many important aspects of sustainability remain abstract and not interlinked. A fully integrated model can overcome compartmentality in the assessment process and provides opportunity for a better integrative exploratory planning process. The objective of this paper is to explore the benefit of an integrated modelling approach to SA and how a structured integrated model can be used to provide a coherent, consistent and deliberative platform to assess policy or planning proposals. The paper discusses a participative and integrative modelling approach to urban river corridor development, incorporating the principal of sustainability. The paper uses a case study site in Sheffield, UK, with three alternative development scenarios, incorporating a number of possible riverside design features. An integrated SA model is used to develop better design by optimising different design elements and delivering a more sustainable (re)-development plan. We conclude that participatory integrated modelling has strong potential for supporting the SA processes. A high degree of integration provides the opportunity for more inclusive and informed decision-making regarding issues of urban development. It also provides the opportunity to reflect on their long-term dynamics, and to gain insights on the interrelationships underlying persistent sustainability problems. Thus the ability to address economic, social and environmental interdependencies within policies, plans, and legislations is enhanced. Copyright © 2013 Elsevier Ltd. All rights reserved.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Fuels planning: science synthesis and integration; economic uses fact sheet 05: NEPA and economics
Rocky Mountain Research Station USDA Forest Service
2004-01-01
The National Environmental Policy Act (NEPA) is the law that requires Federal agencies to consider the environmental impacts of their actions, involve the public in the decisionmaking process, and disclose information, starting at the initial stages of planning. This fact sheet discusses when you should consider economics in the NEPA process, when to do an analysis,...
Trent Wickman; Ann Acheson
2005-01-01
The Smoke Impact Spreadsheet (SIS) is a simple-to-use planning model for calculating particulate matter (PM) emissions and concentrations downwind of wildland fires. This fact sheet identifies the intended users and uses, required inputs, what the model does and does not do, and tells the user how to obtain the model.
ERIC Educational Resources Information Center
Sias, Christina M.; Nadelson, Louis S.; Juth, Stephanie M.; Seifert, Anne L.
2017-01-01
Students need to be prepared for the 21st century by developing the literacy skills necessary for participating in the age of synthesis--an age that requires a progressive set of skills and knowledge. The authors identified nine educational innovations that are perceived to be effective for preparing students for the 21st century age of synthesis…
Serving our communities better. Guidelines for planning and developing integrated delivery networks.
Prybil, L; Golden, P; Ballance, X
1995-04-01
In 1994 the Daughters of Charity National Health System-East Central (DCNHS-East Central) adopted 11 guidelines to help corporate staff and local leaders plan and develop integrated networks. Guideline 1 emphasizes needs-based strategic planning. Guideline 2 focuses on the community-based network planning process, recommending a team approach and ongoing communication with the local ordinary. In guidelines 3 through 5, the DCNHS-East Central Board of Directors spells out key issues that must be covered in proposals ultimately presented for governance action. Guideline 6 presents three core elements that should characterize all CBNs in which DCNHS-East Central institutions participate. Guideline 7 emphasizes that all CBN proposals and agreements must be clear with respect to the Catholic identity of DCNHS-East Central institutions. Guidelines 8 and 9 require that proposed changes to traditional policies and management practices be explicit in CBN proposals. The tenth guideline requires that all CBN proposals indicate an explicit evaluation function. The final guideline underscores that regardless of the strategic fit or how well a CBN is designed, it is unlikely to succeed unless both internal and external relationships are based on a solid foundation of honesty, mutual respect, and trust.
The Hyper-X Flight Systems Validation Program
NASA Technical Reports Server (NTRS)
Redifer, Matthew; Lin, Yohan; Bessent, Courtney Amos; Barklow, Carole
2007-01-01
For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.
Sattler, Bernhard; Jochimsen, Thies; Barthel, Henryk; Sommerfeld, Kerstin; Stumpp, Patrick; Hoffmann, Karl-Titus; Gutberlet, Matthias; Villringer, Arno; Kahn, Thomas; Sabri, Osama
2013-02-01
The implementation of hybrid imaging systems requires thorough and anticipatory planning at local and regional levels. For installation of combined positron emission and magnetic resonance imaging systems (PET/MRI), a number of physical and constructional provisions concerning shielding of electromagnetic fields (RF- and high-field) as well as handling of radionuclides have to be met, the latter of which includes shielding for the emitted 511 keV gamma rays. Based on our experiences with a SIEMENS Biograph mMR system, a step-by-step approach is required to allow a trouble-free installation. In this article, we present a proposal for a standardized step-by-step plan to accomplish the installation of a combined PET/MRI system. Moreover, guidelines for the smooth operation of combined PET/MRI in an integrated research and clinical setting will be proposed. Overall, the most important preconditions for the successful implementation of PET/MRI in an integrated research and clinical setting is the interdisciplinary target-oriented cooperation between nuclear medicine, radiology, and all referring and collaborating institutions at all levels of interaction (personnel, imaging protocols, reporting, selection of the data transfer and communication methods).
Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bourgeois, N.C.; Greer, D.K.
1993-04-01
This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hurlbut, David; Zhou, Ella; Bird, Lori
A strategically planned transmission network is an important source of flexibility for the integration of large-scale renewable energy (RE). Such a network can offer access to a broad geographic diversity of resources, which can reduce flexibility needs and facilitate sharing between neighboring balancing areas. This report builds on two previous NREL technical reports - Advancing System Flexibility for High Penetration Renewable Integration (Milligan et al. 2015) and 'Renewables-Friendly' Grid Development Strategies (Hurlbut et al. 2015) - which discuss various flexibility options and provide an overview of U.S. market models and grid planning. This report focuses on addressing issues with cross-regional/provincialmore » transmission in China with the aim of integrating renewable resources that are concentrated in remote areas and require inter-regional/provincial power exchange.« less
NASA Technical Reports Server (NTRS)
1988-01-01
This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.
Wildlife monitoring program plan
NASA Technical Reports Server (NTRS)
Sebesta, P.; Arno, R.
1979-01-01
A plan for integrating the various requirements for wildlife monitoring with modern aerospace technology is presented. This plan is responsive to user needs, recognizes legal requirements, and is based on an evolutionary growth from domestic animals and larger animals to smaller, more scarce and remote species. The basis for animal study selection was made from the 1973 Santa Cruz Summer Study on Wildlife Monitoring. As techniques are developed the monitoring and management tasks will be interfaced with and eventually operated by the user agencies. Field efforts, aircraft and satellites, will be supplemented by laboratory investigations. Sixty percent of the effort will be in hardware research and development (satellite technology, microminiaturization) and the rest for gathering and interpreting data.
Geospatial Science is increasingly becoming an important tool in making Agency decisions. Quality Control and Quality Assurance are required to be integrated during the planning, implementation and assessment of geospatial databases, processes and products. In order to ensure Age...
A Hybrid 3D Indoor Space Model
NASA Astrophysics Data System (ADS)
Jamali, Ali; Rahman, Alias Abdul; Boguslawski, Pawel
2016-10-01
GIS integrates spatial information and spatial analysis. An important example of such integration is for emergency response which requires route planning inside and outside of a building. Route planning requires detailed information related to indoor and outdoor environment. Indoor navigation network models including Geometric Network Model (GNM), Navigable Space Model, sub-division model and regular-grid model lack indoor data sources and abstraction methods. In this paper, a hybrid indoor space model is proposed. In the proposed method, 3D modeling of indoor navigation network is based on surveying control points and it is less dependent on the 3D geometrical building model. This research proposes a method of indoor space modeling for the buildings which do not have proper 2D/3D geometrical models or they lack semantic or topological information. The proposed hybrid model consists of topological, geometrical and semantical space.
Integrated tokamak modeling: when physics informs engineering and research planning
NASA Astrophysics Data System (ADS)
Poli, Francesca
2017-10-01
Simulations that integrate virtually all the relevant engineering and physics aspects of a real tokamak experiment are a power tool for experimental interpretation, model validation and planning for both present and future devices. This tutorial will guide through the building blocks of an ``integrated'' tokamak simulation, such as magnetic flux diffusion, thermal, momentum and particle transport, external heating and current drive sources, wall particle sources and sinks. Emphasis is given to the connection and interplay between external actuators and plasma response, between the slow time scales of the current diffusion and the fast time scales of transport, and how reduced and high-fidelity models can contribute to simulate a whole device. To illustrate the potential and limitations of integrated tokamak modeling for discharge prediction, a helium plasma scenario for the ITER pre-nuclear phase is taken as an example. This scenario presents challenges because it requires core-edge integration and advanced models for interaction between waves and fast-ions, which are subject to a limited experimental database for validation and guidance. Starting from a scenario obtained by re-scaling parameters from the demonstration inductive ``ITER baseline'', it is shown how self-consistent simulations that encompass both core and edge plasma regions, as well as high-fidelity heating and current drive source models are needed to set constraints on the density, magnetic field and heating scheme. This tutorial aims at demonstrating how integrated modeling, when used with adequate level of criticism, can not only support design of operational scenarios, but also help to asses the limitations and gaps in the available models, thus indicating where improved modeling tools are required and how present experiments can help their validation and inform research planning. Work supported by DOE under DE-AC02-09CH1146.
Optimum-AIV: A planning and scheduling system for spacecraft AIV
NASA Technical Reports Server (NTRS)
Arentoft, M. M.; Fuchs, Jens J.; Parrod, Y.; Gasquet, Andre; Stader, J.; Stokes, I.; Vadon, H.
1991-01-01
A project undertaken for the European Space Agency (ESA) is presented. The project is developing a knowledge based software system for planning and scheduling of activities for spacecraft assembly, integration, and verification (AIV). The system extends into the monitoring of plan execution and the plan repair phase. The objectives are to develop an operational kernel of a planning, scheduling, and plan repair tool, called OPTIMUM-AIV, and to provide facilities which will allow individual projects to customize the kernel to suit its specific needs. The kernel shall consist of a set of software functionalities for assistance in initial specification of the AIV plan, in verification and generation of valid plans and schedules for the AIV activities, and in interactive monitoring and execution problem recovery for the detailed AIV plans. Embedded in OPTIMUM-AIV are external interfaces which allow integration with alternative scheduling systems and project databases. The current status of the OPTIMUM-AIV project, as of Jan. 1991, is that a further analysis of the AIV domain has taken place through interviews with satellite AIV experts, a software requirement document (SRD) for the full operational tool was approved, and an architectural design document (ADD) for the kernel excluding external interfaces is ready for review.
Tug fleet and ground operations schedules and controls. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1975-01-01
This study presents Tug Fleet and Ground Operations Schedules and Controls plan. This plan was developed and optimized out of a combination of individual Tug program phased subplans, special emphasis studies, contingency analyses and sensitivity analyses. The subplans cover the Tug program phases: (1) Tug operational, (2) Interim Upper Stage (IUS)/Tug fleet utilization, (3) and IUS/Tug payload integration, (4) Tug site activation, (5) IUS/Tug transition, (6) Tug acquisition. Resource requirements (facility, GSE, TSE, software, manpower, logistics) are provided in each subplan, as are appropriate Tug processing flows, active and total IUS and Tug fleet requirements, fleet management and Tug payload integration concepts, facility selection recommendations, site activation and IUS to Tug transition requirements. The impact of operational concepts on Tug acquisition is assessed and the impact of operating Tugs out of KSC and WTR is analyzed and presented showing WTR as a delta. Finally, cost estimates for fleet management and ground operations of the DDT&E and operational phases of the Tug program are given.
Okamoto, Etsuji; Miyamoto, Masaki; Hara, Kazuhiro; Yoshida, Jun; Muto, Masaki; Hirai, Aizan; Tatsumi, Haruyuki; Mizuno, Masaaki; Nagata, Hiroshi; Yamakata, Daisuke; Tanaka, Hiroshi
2011-01-01
Introduction In April 2008, Japan launched a radical reform in regional health planning that emphasized the development of disease-oriented clinical care pathways. These ‘inter-provider critical paths’ have sought to ensure effective integration of various providers ranging among primary care practitioners, acute care hospitals, rehabilitation hospitals, long-term care facilities and home care. Description of policy practice All 47 prefectures in Japan developed their Regional Health Plans pursuant to the guideline requiring that these should include at least four diseases: diabetes, acute myocardial infarction, cerebrovascular accident and cancer. To illustrate the care pathways developed, this paper describes the guideline referring to strokes and provides examples of the new Regional Health Plans as well as examples of disease-oriented inter-provider clinical paths. In particular, the paper examines the development of information sharing through electronic health records (EHR) to enhance effective integration among providers is discussed. Discussion and conclusion Japan’s reform in 2008 is unique in that the concept of ‘disease-oriented regional inter-provider critical paths’ was adopted as a national policy and all 47 prefectures developed their Regional Health Plans simultaneously. How much the new regional health planning policy has improved the quality and outcome of care remains to be seen and will be evaluated in 2013 after the five-year planned period of implementation has concluded. Whilst electronic health records appear to be a useful tool in supporting care integration they do not guarantee success in the application of an inter-provider critical path. PMID:22128281
Integrated watershed planning across jurisdictional boundaries
NASA Astrophysics Data System (ADS)
Watts, A. W.; Roseen, R.; Stacey, P.; Bourdeau, R.
2014-12-01
We will present the foundation for an Coastal Watershed Integrated Plan for three communities in southern New Hampshire. Small communities are often challenged by complex regulatory requirements and limited resources, but are wary of perceived risks in engaging in collaborative projects with other communities. Potential concerns include loss of control, lack of resources to engage in collaboration, technical complexity, and unclear benefits. This project explores a multi-town subwatershed application of integrated planning across jurisdictional boundaries that addresses some of today's highest priority water quality issues: wastewater treatment plant upgrades for nutrient removal; green infrastructure stormwater management for developing and re-developing areas; and regional monitoring of ecosystem indicators in support of adaptive management to achieve nutrient reduction and other water quality goals in local and downstream waters. The project outcome is a collaboratively-developed inter-municipal integrated plan, and a monitoring framework to support cross jurisdictional planning and assess attainment of water quality management goals. This research project has several primary components: 1) assessment of initial conditions, including both the pollutant load inputs and the political, economic and regulatory status within each community, 2) a pollutant load model for point and non-point sources, 3) multi-criteria evaluation of load reduction alternatives 4) a watershed management plan optimized for each community, and for Subwatersheds combining multiple communities. The final plan will quantify the financial and other benefits/drawbacks to each community for both inter municipal and individual pollution control approaches. We will discuss both the technical and collaborative aspects of the work, with lessons learned regarding science to action, incorporation of social, economic and water quality assessment parameters, and stakeholder/researcher interaction.
NASA Technical Reports Server (NTRS)
1980-01-01
Soil moisture information is a potentially powerful tool for applications in agriculture, water resources, and climate. At present, it is difficult for users of this information to clearly define their needs in terms of accuracy, resolution and frequency because of the current sparsity of data. A plan is described for defining and conducting an integrated and coordinated research effort to develop and refine remote sensing techniques which will determine spatial and temporal variations of soil moisture and to utilize soil moisture information in support of agricultural, water resources, and climate applications. The soil moisture requirements of these three different application areas were reviewed in relation to each other so that one plan covering the three areas could be formulated. Four subgroups were established to write and compile the plan, namely models, ground-based studies, aircraft experiments, and spacecraft missions.
New Strategy and Innovative Projects at the National Biosurveillance Integration Center
Bennett, Steven; Quitugua, Teresa
2013-01-01
Objective Enhance knowledge of the vision, mission, strategic goals, and objectives of the National Biosurveillance Integration Center (NBIC). Learn about innovative biosurveillance projects ongoing in NBIC. Introduction For a number of years, the federal government has provided biosurveillance in various domains within different departments and agencies. Congress recognized the need for a means of integrating these separate information sources into a more useable resource by chartering NBIC within the Department of Homeland Security. Methods NBIC engaged the biosurveillance community within and beyond the federal government through a series of extensive discussions, workshops, and symposia to define a strategy for future development of integrated biosurveillance activities grounded in legislative and presidential direction. The NBIC Strategic Plan was extensively reviewed by the twelve federal Departments that comprise the National Biosurveillance Integration System (NBIS) as well as the White House Office of Management and Budget. The NBIC Strategic Plan is currently being revised for release of a public version. The NBIC also engaged partners in the development of projects designed to develop and test new approaches to biosurveillance. Results The NBIC Strategic Plan was delivered to Congress in August, 2012. The plan explains the Center’s approach, why it is needed, and how it seeks to execute the mission of integrating national biosurveillance information to provide relevant and timely information that effectively supports decision making. Projects are underway involving text analyses of emergency medical system data, changes to poison control center data collection and analysis, and the application of machine learning to social media analyses. A sub-working group of the NBIS has been established to guide selection of future pilot project areas to address prioritized requirements for integrated biosurveillance. Conclusions NBIC has increased flexibility in its commitment to collaboration and coordination, engaged in bold new approaches, and is defining requirements that will encourage buy-in and support of the users across the levels of government and the private sector. With success in its mission, NBIC will support its partners’ missions and provide relevant and timely information that effectively supports decision making.
USDA-ARS?s Scientific Manuscript database
The paradigm of integrated water resources management requires coupled analysis of hydrology and water resources in a river basin. Population growth and uncertainties due to climate change make historic data not a reliable source of information for future planning of water resources, hence necessit...
Successful integration requires data on disease distribution and utilization patterns.
1998-08-01
Planning and development: Where should integrated networks locate or establish contracts with physician offices, hospitals, nursing homes or other facilities? A close look at demand and supply data is the only way to effectively determine your community's needs. Sources abound for such data, but there are a few things you need to be careful about when using national or regional information.
OSTA data systems planning workshop recommendations
NASA Technical Reports Server (NTRS)
Desjardins, R.
1981-01-01
The Integrated Discipline Requirements are presented, including the following needs: (1) quality data sets, (2) a systematic treatment of problems with present data, (3) a single integrated catalog or master directory, (4) continuity of data formats, (5) a standard geographic and time basis, (6) data delivery in terms of easy rather than immediate accessibility, (7) data archives, and (8) cooperation with user agencies.
Medical mall founders' satisfaction and integrated management requirements.
Ito, Atsushi
2017-10-01
Medical malls help provide integrated medical services and the effective and efficient independent management of multiple clinics, pharmacies and other medical facilities. Primary care in an aging society is a key issue worldwide and the establishment of a new model for primary care in Japanese medical malls is needed. Understanding the requirements of integrated management that contribute to the improvement of medical mall founders' satisfaction levels will help provide better services. We conducted a questionnaire survey targeting 1840 medical facilities nationwide; 351 facilities responded (19.1%). We performed comparative analyses on founders' satisfaction levels according to years in business, department/area, founder's relationship, decision-making system and presence/absence of liaison role. A total of 70% of medical malls in Japan have adjacent relationships with no liaison role in most cases; however, 60% of founders are satisfied. Integrated management requirements involve establishing the mall with peers from the same medical office unit or hospital, and establishing a system in which all founders can participate in decision-making (council system) or one where each general practitioner (GP) independently runs a clinic without communicating with others. The council system can ensure the capability of general practitioners to treat many primary care patients in the future. © 2016 The Authors. The International Journal of Health Planning and Management Published by John Wiley & Sons Ltd. © 2016 The Authors. The International Journal of Health Planning and Management Published by John Wiley & Sons Ltd.
Unexplained Obstruction of an Integrated Cardiotomy Filter During Cardiopulmonary Bypass.
Alwardt, Cory M; Wilson, Donald S; Pajaro, Octavio E
2017-03-01
Cardiopulmonary bypass (CPB) is considered relatively safe in most cases, yet is not complication free. We present a case of an integrated cardiotomy filter obstruction during CPB, requiring circuit reconfiguration. Approximately an hour after uneventful initiation of CPB the integrated cardiotomy filter became obstructed over several minutes, requiring circuit reconfiguration using an external cardiotomy filter to maintain functionality. Following reconfiguration, CPB was maintained with a fully functional circuit allowing safe patient support throughout the remainder of CPB. Postoperatively, there was no sign of thrombus or mechanical obstruction of the filter, which was sent to the manufacturer for analysis. The cause of the obstruction was unclear even after chemical analysis, visual inspection, and a review of all techniques and products to which the patient was exposed. The patient had a generally routine hospital stay, with no signs or symptoms related to the incident. To our knowledge, this is the first report describing an obstructed integrated cardiotomy filter. An appropriate readiness plan for such an incident includes proper venting of the filter chamber, a method for detecting an obstruction, and a plan for circuit reconfiguration. This case illustrates the need for a formal reporting structure for incidents or "near miss" incidents during CPB.
LANDSAT-D Mission Operations Review (MOR)
NASA Technical Reports Server (NTRS)
1982-01-01
The integrated LANDSAT-D systems operation plan is presented and discussed with respect to functional elements, personnel, and procedures. Specifically, a review of the LANDSAT-D program, mission requirements and management, and flight operations is given.
Geospatial Science is increasingly becoming an important tool in making Agency decisions. QualIty Control and Quality Assurance are required to be integrated during the planning, implementation and assessment of geospatial databases, processes and products. In order to ensure Age...
76 FR 19775 - Agency Information Collection Activities: Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... Reporting Requirements will be an integral resource for oversight, monitoring, compliance and auditing... and auditing activities necessary to ensure quality provision of the benefits provided by MA plans to...
Enhancing the Human Factors Engineering Role in an Austere Fiscal Environment
NASA Technical Reports Server (NTRS)
Stokes, Jack W.
2003-01-01
An austere fiscal environment in the aerospace community creates pressures to reduce program costs, often minimizing or sometimes even deleting the human interface requirements from the design process. With an assumption that the flight crew can recover real time from a poorly human factored space vehicle design, the classical crew interface requirements have been either not included in the design or not properly funded, though carried as requirements. Cost cuts have also affected quality of retained human factors engineering personnel. In response to this concern, planning is ongoing to correct the acting issues. Herein are techniques for ensuring that human interface requirements are integrated into a flight design, from proposal through verification and launch activation. This includes human factors requirements refinement and consolidation across flight programs; keyword phrases in the proposals; closer ties with systems engineering and other classical disciplines; early planning for crew-interface verification; and an Agency integrated human factors verification program, under the One NASA theme. Importance is given to communication within the aerospace human factors discipline, and utilizing the strengths of all government, industry, and academic human factors organizations in an unified research and engineering approach. A list of recommendations and concerns are provided in closing.
Manpower Planning for New Weapon Systems
1978-12-01
Logistics) take the following actions : 1. Institute formal, post-DSARC management reviews of integrated logistic support implementation to verify...that actions are being taken to minimize manpower and other support resource requirements. 2. Urge the Army, Navy and Marine Corps to press on with...examines how manpower planning actually is done by the military services, and recommends actions by the Assistant Secretary of Defense (Manpower Reserve
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
ERIC Educational Resources Information Center
O'Day, Betsy
2016-01-01
Curriculum and lesson planning require the consideration of many things. With a shift to the "Next Generation Science Standards" ("NGSS"), integrating the dimensions of science and engineering practices, disciplinary core ideas, and crosscutting concepts becomes a focus of that planning. The author, Betsy O'Day, an elementary…
Alan A. Ager; Nicole M. Vaillant; Mark A. Finney
2011-01-01
Wildland fire risk assessment and fuel management planning on federal lands in the US are complex problems that require state-of-the-art fire behavior modeling and intensive geospatial analyses. Fuel management is a particularly complicated process where the benefits and potential impacts of fuel treatments must be demonstrated in the context of land management goals...
1990-02-01
proposal to the HQ USAF than optimum communication be- While the report indicated that this recommended a long-range, integrated tween the user and the...SRA), conduct of The three functional Working Integrated logistics program plan- tradeoff studies, and development of Groups are separated into the...as well * INTEGRATION as a rapid retargeting capability. V. SYSTEM REQUIREMENTS Working Conditions At the same time, SAC realized that VI. SYSTEM
Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyers, C; Streitz, F; Yao, Y
2011-09-19
The study's official title is 'ISO Study of Operational Requirements and Market Impacts at 33% Renewable Portfolio Standard (RPS).' The stated objectives are twofold: (1) identifying operational requirements and resource options to reliably operate the ISO-controlled grid under a 33% RPS in 2020; and (2) inform market, planning, and policy/regulatory decisions by the ISO, state agencies, market participants, and other stakeholders. The first of these objectives requires the hourly estimates of integration requirements, measured in terms of operational ramp, load following and regulation capacity and ramp rates, as well as additional capacity to resolve operational violations. It also involves considerationmore » of other variables that affect the results, such as the impact of different mixes of renewable technologies, and the impact of forecasting error and variability. The second objective entails supporting the CPUC to identify long-term procurement planning needs, costs, and options, as well as informing other decisions made by the CPUC and state agencies. For the ISO itself this includes informing state-wide transmission planning needs for renewables up to a 33% RPS, and informing design of wholesale markets for energy and ancillary services to facilitate provision of integration capacities. The study is designed in two phases. The first (current) phase is focused on operational requirements and addressing these requirements with existing and new conventional fossil generation; for instance, gas turbines and/or combined cycle units. The second (planned) phase will address the same operational requirements with a combination of conventional fossil generation resources, new non-generation resources, and a renewable resource dispatch. There are seven different scenarios considered in the current phase: a 20% RPS reference case; four 33% RPS cases (a reference case, a high out-of-state case, a high distributed generation case, and a low load case); an alternative 27.5% RPS case; and an all-gas case (no new renewables after 2008). In addition, the CPUC is planning a new set of cases that will alter the anticipated sets of runs.« less
Di Giulio, Paola; Cotta, Roberto; Bastianello, Donatella; Garaventa, Alberto; Jankovic, Momcilo; Perilongo, Glorgio; Salgarello, M Cristna; Tecchiato, Daniela
2004-01-01
The rapid evolution of care and the constantly changing needs and expectations of patients and their families require flexibility and re-organisation of the caring and treatment activities. These include the increased need for high-specialised personal competence; communication and interpersonal skills; and a close collaboration and integration between doctors and nurses--the main professional groups in the health care team. An optimal integration is not always and easily achievable and requires personal motivation, active efforts, investments and the development of the effective operative models for providing the integrated high specialised daily care. It is not easy in the busy daily routine to find time, motivation and share common goals. This is why a support for the groups willing to implement projects for improving integration between doctors and nurses was provided through an action-research laboratory. The aims of the multi-step action-research laboratory were the following: to improve the integration of different professionals; to improve the exchange of knowledge and skills; to build the necessary bases for planning and running comprehensive, integrated clinical projects in the field of paediatric haematology-oncology. The ultimate goals of this effort was to improve the quality of the care and cure provided to children with cancer and their families. The project lasted three years, and consisted of yearly residential meetings alternating with experiences conducted in the working environments of the participants. The following steps were planned: Identification of the problem. Participants were asked to analyse the main problems of their units, that could be solved-improved with a better integration/collaboration between doctors and nurses and the main difficulties routinely encountered in working effectively together. Groups were asked to analyse the problem in their own practice, identify the possible solutions, main obstacles, strengths and weaknesses, plan the necessary of activities (short and medium term) for improving the problems. Sharing of projects. The projects were shared and common problems and solutions discussed. Final presentation of the projects with the aim of devising solutions and strategies for consolidation of the eventual changes obtained. Supervision, theoretical support and personalised feed-back from the scientific panel were guaranteed between the meetings and during the planning and implementation phases. Methods, instruments and techniques for improving collaboration and integration were discussed during the yearly meetings (i.e. how to work by objectives; how to plan and co-ordinate multidisciplinary meetings...) with lectures, workgroups, role-playing. Representatives from the 16 wards participated to the project: at least one nurse and one doctor from each centre, in the position to take decisions and implement changes. In spite of common problems related to the workload, difficulties in involving other colleagues, 13 projects were implemented. The need to discuss, plan together, organise interdisciplinary meetings improved the integration and communication between doctors and nurses.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schaly, B; Hoover, D; Mitchell, S
2014-08-15
During volumetric modulated arc therapy (VMAT) of head and neck cancer, some patients lose weight which may result in anatomical deviations from the initial plan. If these deviations are substantial a new treatment plan can be designed for the remainder of treatment (i.e., adaptive planning). Since the adaptive treatment process is resource intensive, one possible approach to streamlining the quality assurance (QA) process is to use the electronic portal imaging device (EPID) to measure the integrated fluence for the adapted plans instead of the currently-used ArcCHECK device (Sun Nuclear). Although ArcCHECK is recognized as the clinical standard for patient-specific VMATmore » plan QA, it has limited length (20 cm) for most head and neck field apertures and has coarser detector spacing than the EPID (10 mm vs. 0.39 mm). In this work we compared measurement of the integrated fluence using the EPID with corresponding measurements from the ArcCHECK device. In the past year nine patients required an adapted plan. Each of the plans (the original and adapted) is composed of two arcs. Routine clinical QA was performed using the ArcCHECK device, and the same plans were delivered to the EPID (individual arcs) in integrated mode. The dose difference between the initial plan and adapted plan was compared for ArcCHECK and EPID. In most cases, it was found that the EPID is more sensitive in detecting plan differences. Therefore, we conclude that EPID provides a viable alternative for QA of the adapted head and neck plans and should be further explored.« less
Visit from JAXA to NASA MSFC: The Engines Element & Ideas for Collaboration
NASA Technical Reports Server (NTRS)
Greene, William D.
2013-01-01
System Design, Development, and Fabrication: Design, develop, and fabricate or procure MB-60 component hardware compliant with the imposed technical requirements and in sufficient quantities to fulfill the overall MB-60 development effort. System Development, Assembly, and Test: Manage the scope of the development, assembly, and test-related activities for MB-60 development. This scope includes engine-level development planning, engine assembly and disassembly, test planning, engine testing, inspection, anomaly resolution, and development of necessary ground support equipment and special test equipment. System Integration: Provide coordinated integration in the realms of engineering, safety, quality, and manufacturing disciplines across the scope of the MB-60 design and associated products development Safety and Mission Assurance, structural design, fracture control, materials and processes, thermal analysis. Systems Engineering and Analysis: Manage and perform Systems Engineering and Analysis to provide rigor and structure to the overall design and development effort for the MB-60. Milestone reviews, requirements management, system analysis, program management support Program Management: Manage, plan, and coordinate the activities across all portions of the MB-60 work scope by providing direction for program administration, business management, and supplier management.
Integrating MRP (materiel requirements planning) into modern business.
Lunn, T
1994-05-01
Time is the commodity of the '90s. Therefore, we all must learn how to use our manufacturing systems to shorten lead time and increase customer satisfaction. The objective of this article is to discuss practical ways people integrate the techniques of materiel requirements planning (MRP) systems with just-in-time (JIT) execution systems to increase customer satisfaction. Included are examples of new ways people use MRP systems to exemplify the process of continuous improvement--multiple items on work orders, consolidated routings, flexing capacity, and other new developments. Ways that successful companies use MRP II for planning and JIT for execution are discussed. There are many examples of how to apply theory to real life situations and a discussion of techniques that work to keep companies in the mode of continuous improvement. Also included is a look at hands-on, practical methods people use to achieve lead time reduction and simplify bills of material. Total quality management concepts can be applied to the MRP process itself. This in turn helps people improve schedule adherence, which leads to customer satisfaction.
Renewable Energy Zone (REZ) Transmission Planning Process: A Guidebook for Practitioners
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Nathan; Flores-Espino, Francisco; Hurlbut, David J.
Achieving clean energy goals may require new investments in transmission, especially if planners anticipate economic growth and increased demand for electricity. The renewable energy zone (REZ) transmission planning process can help policymakers ensure their infrastructure investments achieve national goals in the most economical manner. Policymakers, planners, and system operators around the world have used variations of the REZ process to chart the expansion of their transmission networks and overcome the barriers of traditional transmission planning. This guidebook seeks to help power system planners, key decision makers, and stakeholders understand and use the REZ transmission planning process to integrate transmission expansionmore » planning and renewable energy generation planning.« less
Tank waste remediation system configuration management plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vann, J.M.
The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Projectmore » personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.« less
Robotic space simulation integration of vision algorithms into an orbital operations simulation
NASA Technical Reports Server (NTRS)
Bochsler, Daniel C.
1987-01-01
In order to successfully plan and analyze future space activities, computer-based simulations of activities in low earth orbit will be required to model and integrate vision and robotic operations with vehicle dynamics and proximity operations procedures. The orbital operations simulation (OOS) is configured and enhanced as a testbed for robotic space operations. Vision integration algorithms are being developed in three areas: preprocessing, recognition, and attitude/attitude rates. The vision program (Rice University) was modified for use in the OOS. Systems integration testing is now in progress.
Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle
DOE Office of Scientific and Technical Information (OSTI.GOV)
Millard, W. David; Johnson, Daniel M.; Henderson, John M.
2014-07-28
Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less
Generalizable Class Solutions for Treatment Planning of Spinal Stereotactic Body Radiation Therapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weksberg, David C.; Palmer, Matthew B.; Vu, Khoi N.
2012-11-01
Purpose: Spinal stereotactic body radiation therapy (SBRT) continues to emerge as an effective therapeutic approach to spinal metastases; however, treatment planning and delivery remain resource intensive at many centers, which may hamper efficient implementation in clinical practice. We sought to develop a generalizable class solution approach for spinal SBRT treatment planning that would allow confidence that a given plan provides optimal target coverage, reduce integral dose, and maximize planning efficiency. Methods and Materials: We examined 91 patients treated with spinal SBRT at our institution. Treatment plans were categorized by lesion location, clinical target volume (CTV) configuration, and dose fractionation scheme,more » and then analyzed to determine the technically achievable dose gradient. A radial cord expansion was subtracted from the CTV to yield a planning CTV (pCTV) construct for plan evaluation. We reviewed the treatment plans with respect to target coverage, dose gradient, integral dose, conformality, and maximum cord dose to select the best plans and develop a set of class solutions. Results: The class solution technique generated plans that maintained target coverage and improved conformality (1.2-fold increase in the 95% van't Riet Conformation Number describing the conformality of a reference dose to the target) while reducing normal tissue integral dose (1.3-fold decrease in the volume receiving 4 Gy (V{sub 4Gy}) and machine output (19% monitor unit (MU) reduction). In trials of planning efficiency, the class solution technique reduced treatment planning time by 30% to 60% and MUs required by {approx}20%: an effect independent of prior planning experience. Conclusions: We have developed a set of class solutions for spinal SBRT that incorporate a pCTV metric for plan evaluation while yielding dosimetrically superior treatment plans with increased planning efficiency. Our technique thus allows for efficient, reproducible, and high-quality spinal SBRT treatment planning.« less
Integrated Technology Plan for the Civil Space Program, 1991
NASA Technical Reports Server (NTRS)
1991-01-01
The purpose of the Integrated Technology Plan (ITP) is to serve as a strategic plan for the OAST space research and technology (R&T) program, and as a strategic planning framework for other NASA and national participants in advocating and conducting technology developments that support future U.S. civil space missions. The ITP begins with a discussion of the national policy and NASA organization which establishes the overall framework for civil space R&T planning. The second chapter provides a top-level review of the potential users of civil space R&T, their strategic mission plans, and the technologies they have identified as needed to achieve those plans. The overall methodology used to develop a civil space technology strategy is discussed. The technical details of the 1991 strategic plan are described, ending with a review of civil space R&T priorities. The fourth chapter describes how the strategic plan is annually translated into the OAST Space R&T Program, with a summary of the fiscal year 1992 program. The ITP concludes with a discussion of requirements for technology development coordination and strategies for facilitating the transfer of civil space technology to the private sector. Several appendices also are attached that provide further information regarding budget implications of the strategic plan, organizational roles, and other topics.
NASA Technical Reports Server (NTRS)
Chiaramonte, Fran
2003-01-01
This viewgraph presentation discusses the status and goals for the NASA OBPR Physical Science Research Program. The following text was used to summarize the presentation. The OBPR Physical Sciences Research program has been comprehensively reviewed and endorsed by National Research Council. The value and need for the research have been re-affirmed. The research program has been prioritized and resource re-allocations have been carried out through an OBPR-wide process. An increasing emphasis on strategic, mission-oriented research is planned. The program will strive to maintain a balance between strategic and fundamental research. A feasible ISS flight research program fitting within the budgetary and ISS resource envelopes has been formulated for the near term (2003-2007). The current ISS research program will be significantly strengthened starting 2005 by using discipline dedicated research facility racks. A research re-planning effort has been initiated and will include active participation from the research community in the next few months. The research re-planning effort will poise PSR to increase ISS research utilization for a potential enhancement beyond ISS IP Core Complete. The Physical Sciences research program readily integrates the cross-disciplinary requirements of the NASA and OBPR strategic objectives. Each fundamental research thrust will develop a roadmap through technical workshops and Discipline Working Groups (DWGs). Most fundamental research thrusts will involve cross-disciplinary efforts. A Technology Roadmap will guide the Strategic Research for Exploration thrust. The Research Plan will integrate and coordinate fundamental Research Thrusts Roadmaps with the Technology Roadmap. The Technology Roadmap will be developed in coordination with other OBPR programs as well as other Enterprise (R,S,M,N). International Partners will contribute to the roadmaps and through research coordination. The research plan will be vetted with the discipline working groups, the BPRAC subcommittees, and with the BPRAC. Recommendations from NRC past and current committees will be implemented whenever appropriate.Proposed theme element content will be "missionized" around planned content and potential new projects (facilities, modules, initiatives) on approximately a five-year horizon, with the approval of PSRD management. Center/science working group teams will develop descriptions of "mission" objectives, value, and requirements. Purpose is to create a competitive environment for concept development and to stimulate community ownership/advocacy. Proposed theme elements reviewed and approved by PSRD management. Strawman roadmaps for themes developed. Program budget and technology requirements verified. Theme elements are prioritized with the input of advisory groups. Integration into program themes (questions) and required technology investments are defined by science and technology roadmaps. Review and assessment by OBPR management.
Long-Range Educational Policy Planning and the Demand for Educated Manpower in Times of Uncertainty.
ERIC Educational Resources Information Center
Bakke, E. K.
1984-01-01
There is no good method of regulating the educational system based on specific, numerical measurements of labor requirements, and it will be important to integrate uncertainty into future forecasts. Adjustments in demand and supply of educated labor in Norway require a decentralized authority structure providing incentives for institutions and the…
Advance Planning Briefing for Industry. Technology Requirements Briefings
2009-02-17
procedure drills through complex multiplayer interactions representative of a motorcade under heavy attack. The tool shall provide a first-person...Integrated Munitions Effect Assessment IMI Interactive Multimedia Instruction IP Internet Protocol IPE Intelligence Preparation of the Environment IR...CTTSO Programs and Mission Areas/Subgroups 13 Requirement Descriptions Blast Effects and Mitigation (BX) 16 Chemical, Biological, Radiological, and
Assessing patterns of fish demographics and habitat in stream networks
Effective habitat restoration planning requires correctly anticipating demographic responses to altered habitats. New applications of Passive Integrated Transponder (PIT) tag technology to fish-habitat research have provided critical insights into fish movement, growth, and surv...
CONSIDERATIONS FOR INNOVATIVE REMEDIATION TECHNOLOGY EVALUATION SAMPLING PLANS
Field trials of innovative subsurface cleanup technologies require the use of integrated site characterization approaches to obtain critical design parameters, to evaluate pre-treatment contaminant distributions, and to assess process efficiency. This review focuses on the trans...
LIHE Spectral Dynamics and Jaguar Data Acquisition System Measurement Assurance Results 2014.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Covert, Timothy T.; Willis, Michael David; Radtke, Gregg Arthur
2015-06-01
The Light Initiated High Explosive (LIHE) facility performs high rigor, high consequence impulse testing for the nuclear weapons (NW) community. To support the facility mission, LIHE's extensive data acquisition system (DAS) is comprised of several discrete components as well as a fully integrated system. Due to the high consequence and high rigor of the testing performed at LIHE, a measurement assurance plan (MAP) was developed in collaboration with NW system customers to meet their data quality needs and to provide assurance of the robustness of the LIHE DAS. While individual components of the DAS have been calibrated by the SNLmore » Primary Standards Laboratory (PSL), the integrated nature of this complex system requires verification of the complete system, from end-to-end. This measurement assurance plan (MAP) report documents the results of verification and validation procedures used to ensure that the data quality meets customer requirements.« less
The people side of MRP (materiel requirements planning).
Lunn, T
1994-05-01
A montage of ideas and concepts have been successfully used to train and motivate people to use MRP II systems more effectively. This is important today because many companies are striving to achieve World Class Manufacturing status. Closed loop Materiel Requirements Planning (MRP) systems are an integral part of the process of continuous improvement. Successfully using a formal management planning system, such as MRP II, is a fundamental stepping stone on the path toward World Class Excellence. Included in this article are techniques that companies use to reduce lead time, simplify bills of materiel, and improve schedule adherence. These and other steps all depend on the people who use the system. The focus will be on how companies use the MRP tool more effectively.
First Crewed Flight: Rationale, Considerations and Challenges from the Constellation Experience
NASA Technical Reports Server (NTRS)
Noriega, Carlos; Arceneaux, William; Williams, Jeffrey A.; Rhatigan, Jennifer L.
2011-01-01
NASA's Constellation Program has made the most progress in a generation towards building an integrated human-rated spacecraft and launch vehicle. During that development, it became clear that NASA's human-rating requirements lacked the specificity necessary to defend a program plan, particularly human-rating test flight plans, from severe budget challenges. This paper addresses the progress Constellation achieved, problems encountered in clarifying and defending a human-rating certification plan, and discusses key considerations for those who find themselves in similar straits with future human-rated spacecraft and vehicles. We assert, and support with space flight data, that NASA's current human-rating requirements do not adequately address "unknown-unknowns", or the unexpected things the hardware can reveal to the designer during test.
Test plan. GCPS task 7, subtask 7.1: IHM development
NASA Technical Reports Server (NTRS)
Greenberg, H. S.
1994-01-01
The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.
A case study of exploiting enterprise resource planning requirements
NASA Astrophysics Data System (ADS)
Niu, Nan; Jin, Mingzhou; Cheng, Jing-Ru C.
2011-05-01
The requirements engineering (RE) processes have become a key to conceptualising corporate-wide integrated solutions based on packaged enterprise resource planning (ERP) software. The RE literature has mainly focused on procuring the most suitable ERP package. Little is known about how an organisation exploits the chosen ERP RE model to frame the business application development. This article reports an exploratory case study of a key tenet of ERP RE adoption, namely that aligning business applications to the packaged RE model leads to integral practices and economic development. The case study analysed a series interrelated pilot projects developed for a business division of a large IT manufacturing and service company, using Oracle's appl1ication implementation method (AIM). The study indicated that AIM RE improved team collaboration and project management experience, but needed to make hidden assumptions explicit to support data visibility and integrity. Our study can direct researchers towards rigorous empirical evaluations of ERP RE adoption, collect experiences and lessons learned for practitioners, and help generate more effective and mature processes when exploiting ERP RE methods.
A Service Portal for the Integrated SCaN Network
NASA Technical Reports Server (NTRS)
Marx, Sarah R.
2012-01-01
The Space Communication and Navigation (SCaN) program office owns the assets and services provided by the Deep Space Network (DSN), Near Earth Network (NEN), and Space Network (SN). At present, these individual networks are operated by different NASA centers--JPL for DSN--and Goddard Space Flight Center (GSFC) for NEN and SN--with separate commitments offices for each center. In the near future, SCaN's program office would like to deploy an integrated service portal which would merge the two commitments offices with the goal of easing the task of user planning for space missions requiring services of two or more of these networks. Following interviews with subject matter experts in this field, use cases were created to include the services and functionality mission users would like to see in this new integrated service portal. These use cases provide a guideline for a mock-up of the design of the user interface for the portal. The benefit of this work will ease the time required and streamline/standardize the process for planning and scheduling SCAN's services for future space missions.
Nurse manager succession planning: synthesis of the evidence.
Titzer, Jennifer; Phillips, Tracy; Tooley, Stephanie; Hall, Norma; Shirey, Maria
2013-10-01
The literature supporting nurse manager succession planning is reviewed and synthesised to discover best practice for identifying and developing future nurse managers. Healthcare succession planning practices are lacking. Nurse managers are historically selected based on clinical skills and lack formal leadership preparation. A systematic literature search appraises and summarises the current literature supporting nurse manager succession planning. Multiple reviewers were used to increase the reliability and validity of article selection and analysis. New nurse managers require months to adapt to their positions. Deliberate nurse manager succession planning should be integrated in the organisation's strategic plan and provide a proactive method for identifying and developing potential leaders. Organisations that identify and develop internal human capital can improve role transition, reduce nurse manager turnover rates and decrease replacement costs. Despite the clear benefits of succession planning, studies show that resource allocation for proactive, deliberate development of current and future nurse leaders is lacking. Additionally, systematic evaluation of succession planning is limited. Deliberate succession planning efforts and appropriate resource allocation require strategic planning and evaluation methods. Detailed evaluation methods demonstrating a positive return on investment utilising a cost-benefit analysis and empirical outcomes are necessary. © 2013 John Wiley & Sons Ltd.
NASA Technical Reports Server (NTRS)
Thomas, Leann; Utley, Dawn
2006-01-01
While there has been extensive research in defining project organizational structures for traditional projects, little research exists to support high technology government project s organizational structure definition. High-Technology Government projects differ from traditional projects in that they are non-profit, span across Government-Industry organizations, typically require significant integration effort, and are strongly susceptible to a volatile external environment. Systems Integration implementation has been identified as a major contributor to both project success and failure. The literature research bridges program management organizational planning, systems integration, organizational theory, and independent project reports, in order to assess Systems Integration (SI) organizational structure selection for improving the high-technology government project s probability of success. This paper will describe the methodology used to 1) Identify and assess SI organizational structures and their success rate, and 2) Identify key factors to be used in the selection of these SI organizational structures during the acquisition strategy process.
ERIC Educational Resources Information Center
Pavón Vázquez, Víctor; Ávila López, Javier; Gallego Segador, Arturo; Espejo Mohedano, Roberto
2015-01-01
Content and language integrated learning (CLIL) is generally recognised as a fruitful example of bilingual education. However, success in CLIL may not be straightforward and may require the establishment of coordination between content and language teachers. The aim of this study is to investigate if content and language teachers are able to plan…
Total Army Cyber Mission Force: Reserve Component Integration
2016-02-16
will operate under the control of USCYBERCOM. Many of these 133 teams will also be integrated within Unified Combatant Command ( UCC ) planning and...use of these teams would be as service retained forces capable of filling federal contingency and programed UCC requirements. ii. Army National Guard...confirmation, and validation of RC CMF capabilities.50 Overseas Deployment Training (ODT) facilitates RC participation in external UCC
FREEWAT: an HORIZON 2020 project to build open source tools for water management.
NASA Astrophysics Data System (ADS)
Foglia, L.; Rossetto, R.; Borsi, I.; Mehl, S.; Velasco Mansilla, V.
2015-12-01
FREEWAT is an HORIZON 2020 EU project. FREEWAT main result will be an open source and public domain GIS integrated modelling environment for the simulation of water quantity and quality in surface water and groundwater with an integrated water management and planning module. FREEWAT aims at promoting water resource management by simplifying the application of the Water Framework Directive and related Directives. Specific objectives of the project are: to coordinate previous EU and national funded research to integrate existing software modules for water management in a single environment into the GIS based FREEWAT and to support the FREEWAT application in an innovative participatory approach gathering technical staff and relevant stakeholders (policy and decision makers) in designing scenarios for application of water policies. The open source characteristics of the platform allow to consider this an initiative "ad includendum", as further institutions or developers may contribute to the development. Core of the platform is the SID&GRID framework (GIS integrated physically-based distributed numerical hydrological model based on a modified version of MODFLOW 2005; Rossetto et al. 2013) in its version ported to QGIS desktop. Activities are carried out on two lines: (i) integration of modules to fulfill the end-users requirements, including tools for producing feasibility and management plans; (ii) a set of activities to fix bugs and to provide a well-integrated interface for the different tools implemented. Further capabilities to be integrated are: - module for water management and planning; - calibration, uncertainty and sensitivity analysis; - module for solute transport in unsaturated zone; - module for crop growth and water requirements in agriculture; - tools for groundwater quality issues and for the analysis, interpretation and visualization of hydrogeological data. Through creating a common environment among water research/professionals, policy makers and implementers, FREEWAT main impact will be on enhancing science- and participatory approach and evidence-based decision making in water resource management, hence producing relevant and appropriate outcomes for policy implementation. Large stakeholders involvement is thought to guarantee results dissemination and exploitation.
Shuttle payload interface verification equipment study. Volume 2: Technical document, part 1
NASA Technical Reports Server (NTRS)
1976-01-01
The technical analysis is reported that was performed during the shuttle payload interface verification equipment study. It describes: (1) the background and intent of the study; (2) study approach and philosophy covering all facets of shuttle payload/cargo integration; (3)shuttle payload integration requirements; (4) preliminary design of the horizontal IVE; (5) vertical IVE concept; and (6) IVE program development plans, schedule and cost. Also included is a payload integration analysis task to identify potential uses in addition to payload interface verification.
Towards Assessing the Human Trajectory Planning Horizon
Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk
2016-01-01
Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models. PMID:27936015
Towards Assessing the Human Trajectory Planning Horizon.
Carton, Daniel; Nitsch, Verena; Meinzer, Dominik; Wollherr, Dirk
2016-01-01
Mobile robots are envisioned to cooperate closely with humans and to integrate seamlessly into a shared environment. For locomotion, these environments resemble traversable areas which are shared between multiple agents like humans and robots. The seamless integration of mobile robots into these environments requires accurate predictions of human locomotion. This work considers optimal control and model predictive control approaches for accurate trajectory prediction and proposes to integrate aspects of human behavior to improve their performance. Recently developed models are not able to reproduce accurately trajectories that result from sudden avoidance maneuvers. Particularly, the human locomotion behavior when handling disturbances from other agents poses a problem. The goal of this work is to investigate whether humans alter their trajectory planning horizon, in order to resolve abruptly emerging collision situations. By modeling humans as model predictive controllers, the influence of the planning horizon is investigated in simulations. Based on these results, an experiment is designed to identify, whether humans initiate a change in their locomotion planning behavior while moving in a complex environment. The results support the hypothesis, that humans employ a shorter planning horizon to avoid collisions that are triggered by unexpected disturbances. Observations presented in this work are expected to further improve the generalizability and accuracy of prediction methods based on dynamic models.
Integrated propulsion technology demonstrator. Program plan
NASA Technical Reports Server (NTRS)
1994-01-01
NASA and Rockwell have embarked on a cooperative agreement to define, develop, fabricate, and operate an integrated propulsion technology demonstrator (IPTD) for the purpose of validating design, process, and technology improvements of launch vehicle propulsion systems. This program, a result of NRA8-11, Task Area 1 A, is jointly funded by both NASA and Rockwell and is sponsored by the Reusable Launch Vehicle office at NASA Marshall Space flight Center. This program plan provides to the joint NASA/Rockwell integrated propulsion technology demonstrator (IPTD) team a description of the activities within tasks / sub tasks and associated schedules required to successfully achieve program objectives. This document also defines the cost elements and manpower allocations for each sub task for purpose of program control. This plan is updated periodically by developing greater depth of direction for outyear tasks as the program matures. Updating is accomplished by adding revisions to existing pages or attaching page revisions to this plan. In either case, revisions will be identified by appropriate highlighting of the change, or specifying a revision page through the use of footnotes on the bottom right of each change page. Authorization for the change is provided by the principal investigators to maintain control of this program plan document and IPTD program activities.
Integrating human resources and program-planning strategies.
Smith, J E
1989-06-01
The integration of human resources management (HRM) strategies with long-term program-planning strategies in hospital pharmacy departments is described. HRM is a behaviorally based, comprehensive strategy for the effective management and use of people that seeks to achieve coordination and integration with overall planning strategies and other managerial functions. It encompasses forecasting of staffing requirements; determining work-related factors that are strong "motivators" and thus contribute to employee productivity and job satisfaction; conducting a departmental personnel and skills inventory; employee career planning and development, including training and education programs; strategies for promotion and succession, including routes of advancement that provide alternatives to the managerial route; and recruitment and selection of new personnel to meet changing departmental needs. Increased competitiveness among hospitals and a shortage of pharmacists make it imperative that hospital pharmacy managers create strategies to attract, develop, and retain the right individuals to enable the department--and the hospital as a whole--to grow and change in response to the changing health-care environment in the United States. Pharmacy managers would be greatly aided in this mission by the establishment of a well-defined, national strategic plan for pharmacy programs and services that includes an analysis of what education and training are necessary for their successful accomplishment. Creation of links between overall program objectives and people-planning strategies will aid hospital pharmacy departments in maximizing the long-term effectiveness of their practice.
Preoperative planning and perioperative management for minimally invasive total knee arthroplasty.
Scuderi, Giles R
2006-07-01
The introduction of minimally invasive surgery (MIS) has led to new clinical pathways for total knee arthroplasty (TKA). MIS TKA outcomes are affected by multiple factors--the surgery itself; preoperative planning and medical management; preoperative patient education; preemptive perioperative and postoperative analgesia; mode of anesthesia; optimal rehabilitation; and enlightened home care and social services-and therefore an integrated team approach to patient and surgery is required.
Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less
Managing uncertainty in flood protection planning with climate projections
NASA Astrophysics Data System (ADS)
Dittes, Beatrice; Špačková, Olga; Schoppa, Lukas; Straub, Daniel
2018-04-01
Technical flood protection is a necessary part of integrated strategies to protect riverine settlements from extreme floods. Many technical flood protection measures, such as dikes and protection walls, are costly to adapt after their initial construction. This poses a challenge to decision makers as there is large uncertainty in how the required protection level will change during the measure lifetime, which is typically many decades long. Flood protection requirements should account for multiple future uncertain factors: socioeconomic, e.g., whether the population and with it the damage potential grows or falls; technological, e.g., possible advancements in flood protection; and climatic, e.g., whether extreme discharge will become more frequent or not. This paper focuses on climatic uncertainty. Specifically, we devise methodology to account for uncertainty associated with the use of discharge projections, ultimately leading to planning implications. For planning purposes, we categorize uncertainties as either visible
, if they can be quantified from available catchment data, or hidden
, if they cannot be quantified from catchment data and must be estimated, e.g., from the literature. It is vital to consider the hidden uncertainty
, since in practical applications only a limited amount of information (e.g., a finite projection ensemble) is available. We use a Bayesian approach to quantify the visible uncertainties
and combine them with an estimate of the hidden uncertainties to learn a joint probability distribution of the parameters of extreme discharge. The methodology is integrated into an optimization framework and applied to a pre-alpine case study to give a quantitative, cost-optimal recommendation on the required amount of flood protection. The results show that hidden uncertainty ought to be considered in planning, but the larger the uncertainty already present, the smaller the impact of adding more. The recommended planning is robust to moderate changes in uncertainty as well as in trend. In contrast, planning without consideration of bias and dependencies in and between uncertainty components leads to strongly suboptimal planning recommendations.
A user interface for a knowledge-based planning and scheduling system
NASA Technical Reports Server (NTRS)
Mulvehill, Alice M.
1988-01-01
The objective of EMPRESS (Expert Mission Planning and Replanning Scheduling System) is to support the planning and scheduling required to prepare science and application payloads for flight aboard the US Space Shuttle. EMPRESS was designed and implemented in Zetalisp on a 3600 series Symbolics Lisp machine. Initially, EMPRESS was built as a concept demonstration system. The system has since been modified and expanded to ensure that the data have integrity. Issues underlying the design and development of the EMPRESS-I interface, results from a system usability assessment, and consequent modifications are described.
Challenges in physician supply planning: the case of Belgium.
Stordeur, Sabine; Léonard, Christian
2010-12-08
Planning human resources for health (HRH) is a complex process for policy-makers and, as a result, many countries worldwide swing from surplus to shortage. In-depth case studies can help appraising the challenges encountered and the solutions implemented. This paper has two objectives: to identify the key challenges in HRH planning in Belgium and to formulate recommendations for an effective HRH planning, on the basis of the Belgian case study and lessons drawn from an international benchmarking. In Belgium, a numerus clausus set up in 1997 and effective in 2004, aims to limit the total number of physicians working in the curative sector. The assumption of a positive relationship between physician densities and health care utilization was a major argument in favor of medical supply restrictions. This new regulation did not improve recurrent challenges such as specialty imbalances, with uncovered needs particularly among general practitioners, and geographical maldistribution. New difficulties also emerged. In particular, limiting national training of HRH turned out to be ineffective within the open European workforce market. The lack of integration of policies affecting HRH was noteworthy. We described in the paper what strategies were developed to address those challenges in Belgium and in neighboring countries. Planning the medical workforce involves determining the numbers, mix, and distribution of health providers that will be required at some identified future point in time. To succeed in their task, health policy planners have to take a broader perspective on the healthcare system. Focusing on numbers is too restrictive and adopting innovative policies learned from benchmarking without integration and coordination is unfruitful. Evolving towards a strategic planning is essential to control the effects of the complex factors impacting on human resources. This evolution requires an effective monitoring of all key factors affecting supply and demand, a dynamic approach, and a system-level perspective, considering all healthcare professionals, and integrating manpower planning with workforce development. To engage in an evidence-based action, policy-makers need a global manpower picture, from their own country and abroad, as well as reliable and comparable manpower databases allowing proper analysis and planning of the workforce.
Challenges in physician supply planning: the case of Belgium
2010-01-01
Introduction Planning human resources for health (HRH) is a complex process for policy-makers and, as a result, many countries worldwide swing from surplus to shortage. In-depth case studies can help appraising the challenges encountered and the solutions implemented. This paper has two objectives: to identify the key challenges in HRH planning in Belgium and to formulate recommendations for an effective HRH planning, on the basis of the Belgian case study and lessons drawn from an international benchmarking. Case description In Belgium, a numerus clausus set up in 1997 and effective in 2004, aims to limit the total number of physicians working in the curative sector. The assumption of a positive relationship between physician densities and health care utilization was a major argument in favor of medical supply restrictions. This new regulation did not improve recurrent challenges such as specialty imbalances, with uncovered needs particularly among general practitioners, and geographical maldistribution. New difficulties also emerged. In particular, limiting national training of HRH turned out to be ineffective within the open European workforce market. The lack of integration of policies affecting HRH was noteworthy. We described in the paper what strategies were developed to address those challenges in Belgium and in neighboring countries. Discussion and evaluation Planning the medical workforce involves determining the numbers, mix, and distribution of health providers that will be required at some identified future point in time. To succeed in their task, health policy planners have to take a broader perspective on the healthcare system. Focusing on numbers is too restrictive and adopting innovative policies learned from benchmarking without integration and coordination is unfruitful. Evolving towards a strategic planning is essential to control the effects of the complex factors impacting on human resources. This evolution requires an effective monitoring of all key factors affecting supply and demand, a dynamic approach, and a system-level perspective, considering all healthcare professionals, and integrating manpower planning with workforce development. Conclusion To engage in an evidence-based action, policy-makers need a global manpower picture, from their own country and abroad, as well as reliable and comparable manpower databases allowing proper analysis and planning of the workforce. PMID:21138596
The key to using a learning or skill acquisition plan.
Nicholls, Delwyn; Sweet, Linda; Westerway, Sue Campbell; Gibbins, Annie
2014-11-01
A learning plan is a tool to guide the development of knowledge, skills and professional attitudes required for practice. A learning plan is an ideal tool for both supervisors and mentors to guide the process of teaching and learning a medical ultrasound examination. A good learning plan will state the learning goal, identify the learning activities and resources needed to achieve this goal, and highlight the outcome measures, which when achieved indicate the goal has been accomplished. A skill acquisition plan provides a framework for task acquisition and skill stratification; and is an extension of the application of the student learning plan. One unique feature of a skill acquisition plan is it requires the tutor to first undertake a task analysis. The task steps are progressively learnt in sequence, termed scaffolding. The skills to develop and use a learning or skill acquisition plan are also learnt, but are an integral component to the ultrasound tutors skill set. This paper will provide an outline of how to use and apply a learning and skill acquisition plan. We will review how these tools can be personalised to each student and skill teaching environment.
Evolution of Requirements and Assumptions for Future Exploration Missions
NASA Technical Reports Server (NTRS)
Anderson, Molly; Sargusingh, Miriam; Perry, Jay
2017-01-01
NASA programs are maturing technologies, systems, and architectures to enabling future exploration missions. To increase fidelity as technologies mature, developers must make assumptions that represent the requirements of a future program. Multiple efforts have begun to define these requirements, including team internal assumptions, planning system integration for early demonstrations, and discussions between international partners planning future collaborations. For many detailed life support system requirements, existing NASA documents set limits of acceptable values, but a future vehicle may be constrained in other ways, and select a limited range of conditions. Other requirements are effectively set by interfaces or operations, and may be different for the same technology depending on whether the hard-ware is a demonstration system on the International Space Station, or a critical component of a future vehicle. This paper highlights key assumptions representing potential life support requirements and explanations of the driving scenarios, constraints, or other issues that drive them.
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less
Risk assessment of integrated electronic health records.
Bjornsson, Bjarni Thor; Sigurdardottir, Gudlaug; Stefansson, Stefan Orri
2010-01-01
The paper describes the security concerns related to Electronic Health Records (EHR) both in registration of data and integration of systems. A description of the current state of EHR systems in Iceland is provided, along with the Ministry of Health's future vision and plans. New legislation provides the opportunity for increased integration of EHRs and further collaboration between institutions. Integration of systems, along with greater availability and access to EHR data, requires increased security awareness since additional risks are introduced. The paper describes the core principles of information security as it applies to EHR systems and data. The concepts of confidentiality, integrity, availability, accountability and traceability are introduced and described. The paper discusses the legal requirements and importance of performing risk assessment for EHR data. Risk assessment methodology according to the ISO/IEC 27001 information security standard is described with examples on how it is applied to EHR systems.
Quality assurance planning for lunar Mars exploration
NASA Technical Reports Server (NTRS)
Myers, Kay
1991-01-01
A review is presented of the tools and techniques required to meet the challenge of total quality in the goal of traveling to Mars and returning to the moon. One program used by NASA to ensure the integrity of baselined requirements documents is configuration management (CM). CM is defined as an integrated management process that documents and identifies the functional and physical characteristics of a facility's systems, structures, computer software, and components. It also ensures that changes to these characteristics are properly assessed, developed, approved, implemented, verified, recorded, and incorporated into the facility's documentation. Three principal areas are discussed that will realize significant efficiencies and enhanced effectiveness, change assessment, change avoidance, and requirements management.
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Willoughby, John K.; Gardner, Jo A.; Shinkle, Gerald L.
1993-01-01
In 1992, NASA made the decision to evolve a Consolidated Planning System (CPS) by adding the Space Transportation System (STS) requirements to the Space Station Freedom (SSF) planning software. This paper describes this evolutionary process, which began with a series of six-month design-build-test cycles, using a domain-independent architecture and a set of developmental tools known as the Advanced Scheduling Environment. It is shown that, during these tests, the CPS could be used at multiple organizational levels of planning and for integrating schedules from geographically distributed (including international) planning environments. The potential for using the CPS for other planning and scheduling tasks in the SSF program is being currently examined.
ERIC Educational Resources Information Center
Berberet, Heather M.
2006-01-01
Needs assessments require staff with the necessary expertise to design the study, collect the data, analyze the data, and present results. They require money, time, and persistence, because the people one wishes to assess often are difficult to access. This article argues for the centrality of a well-done needs assessment when developing services…
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
2016-04-30
Certification. Simulators must be designed to keep pace with changes to SUAS and sensors. As new sensors, aircraft, and control stations are fielded ...insatiable demand continues to drive requirements that greatly out- pace capacity and budgets. To reverse these trends within the context of fiscal...levels requiring Federal Aviation Administration (FAA) mandated training requirements to integrate with manned air vehicles in the National Airspace
The Fluids Integrated Rack and Light Microscopy Module Integrated Capabilities
NASA Technical Reports Server (NTRS)
Motil, Susan M.; Gati, Frank; Snead, John H.; Hill, Myron E.; Griffin, DeVon W.
2003-01-01
The Fluids Integrated Rack (FIR), a facility class payload, and the Light Microscopy Module (LMM), a subrack payload, are scheduled to be launched in 2005. The LMM integrated into the FIR will provide a unique platform for conducting fluids and biological experiments on ISS. The FIR is a modular, multi-user scientific research facility that will fly in the U.S. laboratory module, Destiny, of the International Space Station (ISS). The first payload in the FIR will be the Light Microscopy Module (LMM). The LMM is planned as a remotely controllable, automated, on-orbit microscope subrack facility, allowing flexible scheduling and control of fluids and biology experiments within the FIR. Key diagnostic capabilities for meeting science requirements include video microscopy to observe microscopic phenomena and dynamic interactions, interferometry to make thin film measurements with nanometer resolution, laser tweezers for particle manipulation, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure photonic properties of materials. The LMM also provides experiment sample containment for frangibles and fluids. This paper will provide a description of the current FIR and LMM designs, planned capabilities and key features. In addition a brief description of the initial five experiments planned for LMM/FIR will be provided.
Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition
NASA Astrophysics Data System (ADS)
Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly
2018-04-01
Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.
NASA Technical Reports Server (NTRS)
Hoebel, Louis J.
1993-01-01
The problem of plan generation (PG) and the problem of plan execution monitoring (PEM), including updating, queries, and resource-bounded replanning, have different reasoning and representation requirements. PEM requires the integration of qualitative and quantitative information. PEM is the receiving of data about the world in which a plan or agent is executing. The problem is to quickly determine the relevance of the data, the consistency of the data with respect to the expected effects, and if execution should continue. Only spatial and temporal aspects of the plan are addressed for relevance in this work. Current temporal reasoning systems are deficient in computational aspects or expressiveness. This work presents a hybrid qualitative and quantitative system that is fully expressive in its assertion language while offering certain computational efficiencies. In order to proceed, methods incorporating approximate reasoning using hierarchies, notions of locality, constraint expansion, and absolute parameters need be used and are shown to be useful for the anytime nature of PEM.
Integrated command, control communication and computation system study
NASA Technical Reports Server (NTRS)
1981-01-01
The study was conducted in three phases: a functional requirements phase; a functional architecture phase; and a design plan phase. The major emphasis was on the functional architecture phase and the approaches used for its functional hierarchy, operations concept, and interfaces.
7 CFR 764.457 - Vendor requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... general goal setting, risk management, and planning. (2) Financial management courses, covering all aspects of farm accounting and focusing on integrating accounting elements into a financial management...) Maintain and use a financial management information system to make financial decisions; (3) Understand and...
Telecommunications: Avoiding the Black Hole.
ERIC Educational Resources Information Center
Riel, Margaret
1993-01-01
Careful planning is required for teachers to take full advantage of the cross-cultural learning opportunities afforded by electronic networks and telecommunications. Networking with more than one classroom and using a well-defined group project integral to other classroom activities are recommended. (EA)
Looking to 2050: The USGS Integrated Software for Imagers and Spectrometers (ISIS)
NASA Astrophysics Data System (ADS)
Becker, T. L.; Edmundson, K. L.; Sides, S.; Hare, T. M.; Laura, J. R.
2017-02-01
Astrogeology Science Center develops and maintains software (ISIS) in support of planetary data for a diverse set of missions. We plan to provide support through the future while adapting to changes in hardware, software, and science requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Shengru; Hurlbut, David J.; Bird, Lori A.
A strategically planned transmission network is an important source of flexibility for the integration of large-scale renewable energy (RE). Such a network can offer access to a broad geographic diversity of resources, which can reduce flexibility needs and facilitate sharing between neighboring balancing areas. This report builds on two previous NREL technical reports - Advancing System Flexibility for High Penetration Renewable Integration (Milligan et al. 2015) and 'Renewables-Friendly' Grid Development Strategies (Hurlbut et al. 2015) - which discuss various flexibility options and provide an overview of U.S. market models and grid planning. This report focuses on addressing issues with cross-regional/provincialmore » transmission in China with the aim of integrating renewable resources that are concentrated in remote areas and require inter-regional/provincial power exchange.« less
Packaging Concerns and Techniques for Large Devices: Challenges for Complex Electronics
NASA Technical Reports Server (NTRS)
LaBel, Kenneth A.; Sampson, Michael J.
2010-01-01
NASA is going to have to accept the use of non-hermetic packages for complex devices. There are a large number of packaging options available. Space application subjects the packages to stresses that they were probably not designed for (vacuum for instance). NASA has to find a way of having assurance in the integrity of the packages. There are manufacturers interested in qualifying non-hermetic packages to MIL-PRF-38535 Class V. Government space users are agreed that Class V should be for hermetic packages only. NASA is working on a new Class for non-hermetic packages for M38535 Appendix B, "Class Y". Testing for package integrity will be required but can be package specific as described by a Package Integrity Test Plan. The plan is developed by the manufacturer and approved by DSCC and government space.
Cradle Enhanced UI Development
NASA Technical Reports Server (NTRS)
Jentsch, Samuel
2016-01-01
This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.
Report on phase 1 of the Microprocessor Seminar. [and associated large scale integration
NASA Technical Reports Server (NTRS)
1977-01-01
Proceedings of a seminar on microprocessors and associated large scale integrated (LSI) circuits are presented. The potential for commonality of device requirements, candidate processes and mechanisms for qualifying candidate LSI technologies for high reliability applications, and specifications for testing and testability were among the topics discussed. Various programs and tentative plans of the participating organizations in the development of high reliability LSI circuits are given.
Wissen, Ulrike; Schroth, Olaf; Lange, Eckart; Schmid, Willy A
2008-11-01
In discussing issues of landscape change, the complex relationships in the landscape have to be assessed. In participative planning processes, 3D visualisations have a high potential as an aid in understanding and communicating characteristics of landscape conditions by integrating visual and non-visual landscape information. Unclear is, which design and how much interactivity is required for an indicator visualisation that would suit stakeholders best in workshop situations. This paper describes the preparation and application of three different types of integrated 3D visualisations in workshops conducted in the Entlebuch UNESCO Biosphere Reserve (CH). The results reveal that simple representations of a complex issue created by draping thematic maps on the 3D model can make problematic developments visible at a glance; that diagrams linked to the spatial context can help draw attention to problematic relationships not considered beforehand; and that the size of species as indicators of conditions of the landscape's production and biotope function seems to provide a common language for stakeholders with different perspectives. Overall, the of the indicators the functions required to assist in information processing. Further research should focus on testing the effectiveness of the integrated visualisation tools in participative processes for the general public.
The Proposal of the Model for Developing Dispatch System for Nationwide One-Day Integrative Planning
NASA Astrophysics Data System (ADS)
Kim, Hyun Soo; Choi, Hyung Rim; Park, Byung Kwon; Jung, Jae Un; Lee, Jin Wook
The problems of dispatch planning for container truck are classified as the pickup and delivery problems, which are highly complex issues that consider various constraints in the real world. However, in case of the current situation, it is developed by the control system so that it requires the automated planning system under the view of nationwide integrative planning. Therefore, the purpose of this study is to suggest model to develop the automated dispatch system through the constraint satisfaction problem and meta-heuristic technique-based algorithm. In the further study, the practical system is developed and evaluation is performed in aspect of various results. This study suggests model to undergo the study which promoted the complexity of the problems by considering the various constraints which were not considered in the early study. However, it is suggested that it is necessary to add the study which includes the real-time monitoring function for vehicles and cargos based on the information technology.
PLAN2L: a web tool for integrated text mining and literature-based bioentity relation extraction.
Krallinger, Martin; Rodriguez-Penagos, Carlos; Tendulkar, Ashish; Valencia, Alfonso
2009-07-01
There is an increasing interest in using literature mining techniques to complement information extracted from annotation databases or generated by bioinformatics applications. Here we present PLAN2L, a web-based online search system that integrates text mining and information extraction techniques to access systematically information useful for analyzing genetic, cellular and molecular aspects of the plant model organism Arabidopsis thaliana. Our system facilitates a more efficient retrieval of information relevant to heterogeneous biological topics, from implications in biological relationships at the level of protein interactions and gene regulation, to sub-cellular locations of gene products and associations to cellular and developmental processes, i.e. cell cycle, flowering, root, leaf and seed development. Beyond single entities, also predefined pairs of entities can be provided as queries for which literature-derived relations together with textual evidences are returned. PLAN2L does not require registration and is freely accessible at http://zope.bioinfo.cnio.es/plan2l.
Simulation Assessment Validation Environment (SAVE). Software User’s Manual
2000-09-01
requirements and decisions are made. The integration is leveraging work from other DoD organizations so that high -end results are attainable much faster than...planning through the modeling and simulation data capture and visualization process. The planners can complete the manufacturing process plan with a high ...technologies. This tool is also used to perform “ high level” factory process simulation prior to full CAD model development and help define feasible
NASA Technical Reports Server (NTRS)
Lorenz, E.
1999-01-01
This report comprises the Electrical, Electronic, and Electromechanical (EEE) As Designed Parts List to be used in the Integrated Advanced Microwave Sounding Unit-A (AMSU-A) instrument. The purpose of the EEE As-Designed Parts List is to provide a listing of EEE parts identified for use on the Integrated AMSU-A. All EEE parts used on the AMSU-A must meet the parts control requirements as defined in the Parts Control Plan (POP). All part applications are reviewed by the Parts Control Board (PCB) and granted approval if POP requirements are met. The "As Designed Parts Lists" indicates PCB approval status, and thus also serves as the Program Approved Parts List.
A planning comparison of 7 irradiation options allowed in RTOG 1005 for early-stage breast cancer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Guang-Pei, E-mail: gpchen@mcw.edu; Liu, Feng; White, Julia
2015-04-01
This study compared the 7 treatment plan options in achieving the dose-volume criteria required by the Radiation Therapy Oncology Group (RTOG) 1005 protocol. Dosimetry plans were generated for 15 representative patients with early-stage breast cancer (ESBC) based on the protocol-required dose-volume criteria for each of the following 7 treatment options: 3D conformal radiotherapy (3DCRT), whole-breast irradiation (WBI) plus 3DCRT lumpectomy boost, 3DCRT WBI plus electron boost, 3DCRT WBI plus intensity-modulated radiation therapy (IMRT) boost, IMRT WBI plus 3DCRT boost, IMRT WBI plus electron boost, IMRT WBI plus IMRT boost, and simultaneous integrated boost (SIB) with IMRT. A variety of dose-volumemore » parameters, including target dose conformity and uniformity and normal tissue sparing, were compared for these plans. For the patients studied, all plans met the required acceptable dose-volume criteria, with most of them meeting the ideal criteria. When averaged over patients, most dose-volume goals for all plan options can be achieved with a positive gap of at least a few tenths of standard deviations. The plans for all 7 options are generally comparable. The dose-volume goals required by the protocol can in general be easily achieved. IMRT WBI provides better whole-breast dose uniformity than 3DCRT WBI does, but it causes no significant difference for the dose conformity. All plan options are comparable for lumpectomy dose uniformity and conformity. Patient anatomy is always an important factor when whole-breast dose uniformity and conformity and lumpectomy dose conformity are considered.« less
Design Tools for Cost-Effective Implementation of Planetary Protection Requirements
NASA Technical Reports Server (NTRS)
Hamlin, Louise; Belz, Andrea; Evans, Michael; Kastner, Jason; Satter, Celeste; Spry, Andy
2006-01-01
Since the Viking missions to Mars in the 1970s, accounting for the costs associated with planetary protection implementation has not been done systematically during early project formulation phases, leading to unanticipated costs during subsequent implementation phases of flight projects. The simultaneous development of more stringent planetary protection requirements, resulting from new knowledge about the limits of life on Earth, together with current plans to conduct life-detection experiments on a number of different solar system target bodies motivates a systematic approach to integrating planetary protection requirements and mission design. A current development effort at NASA's Jet Propulsion Laboratory is aimed at integrating planetary protection requirements more fully into the early phases of mission architecture formulation and at developing tools to more rigorously predict associated cost and schedule impacts of architecture options chosen to meet planetary protection requirements.
The Role of Integrated Modeling in the Design and Verification of the James Webb Space Telescope
NASA Technical Reports Server (NTRS)
Mosier, Gary E.; Howard, Joseph M.; Johnston, John D.; Parrish, Keith A.; Hyde, T. Tupper; McGinnis, Mark A.; Bluth, Marcel; Kim, Kevin; Ha, Kong Q.
2004-01-01
The James Web Space Telescope (JWST) is a large, infrared-optimized space telescope scheduled for launch in 2011. System-level verification of critical optical performance requirements will rely on integrated modeling to a considerable degree. In turn, requirements for accuracy of the models are significant. The size of the lightweight observatory structure, coupled with the need to test at cryogenic temperatures, effectively precludes validation of the models and verification of optical performance with a single test in 1-g. Rather, a complex series of steps are planned by which the components of the end-to-end models are validated at various levels of subassembly, and the ultimate verification of optical performance is by analysis using the assembled models. This paper describes the critical optical performance requirements driving the integrated modeling activity, shows how the error budget is used to allocate and track contributions to total performance, and presents examples of integrated modeling methods and results that support the preliminary observatory design. Finally, the concepts for model validation and the role of integrated modeling in the ultimate verification of observatory are described.
Integrating planning and reactive control
NASA Technical Reports Server (NTRS)
Wilkins, David E.; Myers, Karen L.
1994-01-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
Integrating planning and reactive control
NASA Astrophysics Data System (ADS)
Wilkins, David E.; Myers, Karen L.
1994-10-01
Our research is developing persistent agents that can achieve complex tasks in dynamic and uncertain environments. We refer to such agents as taskable, reactive agents. An agent of this type requires a number of capabilities. The ability to execute complex tasks necessitates the use of strategic plans for accomplishing tasks; hence, the agent must be able to synthesize new plans at run time. The dynamic nature of the environment requires that the agent be able to deal with unpredictable changes in its world. As such, agents must be able to react to unanticipated events by taking appropriate actions in a timely manner, while continuing activities that support current goals. The unpredictability of the world could lead to failure of plans generated for individual tasks. Agents must have the ability to recover from failures by adapting their activities to the new situation, or replanning if the world changes sufficiently. Finally, the agent should be able to perform in the face of uncertainty. The Cypress system, described here, provides a framework for creating taskable, reactive agents. Several features distinguish our approach: (1) the generation and execution of complex plans with parallel actions; (2) the integration of goal-driven and event driven activities during execution; (3) the use of evidential reasoning for dealing with uncertainty; and (4) the use of replanning to handle run-time execution problems. Our model for a taskable, reactive agent has two main intelligent components, an executor and a planner. The two components share a library of possible actions that the system can take. The library encompasses a full range of action representations, including plans, planning operators, and executable procedures such as predefined standard operating procedures (SOP's). These three classes of actions span multiple levels of abstraction.
Wong, Wicger; Leung, Lucullus H.T.; Yu, Peter K.N.; So, Ronald W.K.; Cheng, Ashley C.K.
2012-01-01
The purpose of this study was to investigate the potential benefits of using triple‐arc volumetric‐intensity modulated arc radiotherapy (RapidArc (RA)) for the treatment of early‐stage nasopharyngeal carcinoma (NPC). A comprehensive evaluation was performed including plan quality, integral doses, and peripheral doses. Twenty cases of stage I or II NPC were selected for this study. Nine‐field sliding window IMRT, double‐arc, and triple‐arc RA treatment plans were compared with respect to target coverage, dose conformity, critical organ sparing, and integral doses. Measurement of peripheral doses was performed using thermoluminescent dosimeters in an anthropomorphic phantom. While similar conformity and target coverage were achieved by the three types of plans, triple‐arc RA produced better sparing of parotid glands and spinal cord than double‐arc RA or IMRT. Double‐arc RA plans produced slightly inferior parotid sparing and dose homogeneity than the other two delivery methods. The monitor units (MU) required for triple‐arc were about 50% less than those of IMRT plans, while there was no significant difference in the required MUs between triple‐arc and double‐arc RA plans. The peripheral dose in triple‐arc RA was found to be 50% less compared to IMRT near abdominal and pelvic region. Triple‐arc RA improves both the plan quality and treatment efficiency compared with IMRT for the treatment of early stage NPC. It has become the preferred choice of treatment delivery method for early stage NPC at our center. PACS numbers: 87.53.Bn, 87.55.D, 87.55.de, 87.55.dk, 87.56.ng PMID:23149781
"Could I return to my life?" Integrated Narrative Nursing Model in Education (INNE).
Artioli, Giovanna; Foà, Chiara; Cosentino, Chiara; Sulla, Francesco; Sollami, Alfonso; Taffurelli, Chiara
2018-03-28
The Integrated Narrative Nursing Model (INNM) is an approach that integrates the qualitative methodology typical of the human sciences, with the quantitative methodology more often associated with the natural sciences. This complex model, which combines a focus on narrative with quantitative measures, has recently been effectively applied to the assessment of chronic patients. In this study, the model is applied to the planning phase of education (Integrated Narrative Nursing Education, INNE), and proves to be a valid instrument for the promotion of the current educational paradigm that is centered on the engagement of both the patient and the caregiver in their own path of care. The aim of this study is therefore to describe the nurse's strategy in the planning of an educational intervention by using the INNE model. The case of a 70-year-old woman with pulmonary neoplasm is described at her first admission to Hospice. Each step conducted by the reference nurse, who uses INNE to record the nurse-patient narrative and collect subsequent questionnaires in order to create a shared educational plan, is also described. The information collected was submitted, starting from a grounded methodology to the following four levels of analysis: I. Needs Assessment, II. Narrative Diagnosis, III. Quantitative Outcome, IV. Integrated Outcome. Step IV, which is derived from the integration of all levels of analysis, allows a nurse to define, even graphically, the conceptual map of a patient's needs, resources and perspectives, in a completely tailored manner. The INNE model offers a valid methodological support for the professional who intends to educate the patient through an inter-subjective and engaged pathway, between the professional, their patient and the socio-relational context. It is a matter of adopting a complex vision that combines processes and methods that require a steady scientific basis and advanced methodological expertise with active listening and empathy - skills which require emotional intelligence.
NASA Technical Reports Server (NTRS)
Fabinsky, Beth
2006-01-01
WISE, the Wide Field Infrared Survey Explorer, is scheduled for launch in June 2010. The mission operations system for WISE requires a software modeling tool to help plan, integrate and simulate all spacecraft pointing and verify that no attitude constraints are violated. In the course of developing the requirements for this tool, an investigation was conducted into the design of similar tools for other space-based telescopes. This paper summarizes the ground software and processes used to plan and validate pointing for a selection of space telescopes; with this information as background, the design for WISE is presented.
Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)
NASA Technical Reports Server (NTRS)
2005-01-01
This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.
Research priorities and plans for the International Space Station-results of the 'REMAP' Task Force
NASA Technical Reports Server (NTRS)
Kicza, M.; Erickson, K.; Trinh, E.
2003-01-01
Recent events in the International Space Station (ISS) Program have resulted in the necessity to re-examine the research priorities and research plans for future years. Due to both technical and fiscal resource constraints expected on the International Space Station, it is imperative that research priorities be carefully reviewed and clearly articulated. In consultation with OSTP and the Office of Management and budget (OMB), NASA's Office of Biological and Physical Research (OBPR) assembled an ad-hoc external advisory committee, the Biological and Physical Research Maximization and Prioritization (REMAP) Task Force. This paper describes the outcome of the Task Force and how it is being used to define a roadmap for near and long-term Biological and Physical Research objectives that supports NASA's Vision and Mission. Additionally, the paper discusses further prioritizations that were necessitated by budget and ISS resource constraints in order to maximize utilization of the International Space Station. Finally, a process has been developed to integrate the requirements for this prioritized research with other agency requirements to develop an integrated ISS assembly and utilization plan that maximizes scientific output. c2003 American Institute of Aeronautics and Astronautics. Published by Elsevier Science Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Hodgson, Edward; Oehler, William; Dionne, Steve; Converse, David; Jennings, Mallory A.
2012-01-01
NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.
Ramp Technology and Intelligent Processing in Small Manufacturing
NASA Technical Reports Server (NTRS)
Rentz, Richard E.
1992-01-01
To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.
Ramp technology and intelligent processing in small manufacturing
NASA Astrophysics Data System (ADS)
Rentz, Richard E.
1992-04-01
To address the issues of excessive inventories and increasing procurement lead times, the Navy is actively pursuing flexible computer integrated manufacturing (FCIM) technologies, integrated by communication networks to respond rapidly to its requirements for parts. The Rapid Acquisition of Manufactured Parts (RAMP) program, initiated in 1986, is an integral part of this effort. The RAMP program's goal is to reduce the current average production lead times experienced by the Navy's inventory control points by a factor of 90 percent. The manufacturing engineering component of the RAMP architecture utilizes an intelligent processing technology built around a knowledge-based shell provided by ICAD, Inc. Rules and data bases in the software simulate an expert manufacturing planner's knowledge of shop processes and equipment. This expert system can use Product Data Exchange using STEP (PDES) data to determine what features the required part has, what material is required to manufacture it, what machines and tools are needed, and how the part should be held (fixtured) for machining, among other factors. The program's rule base then indicates, for example, how to make each feature, in what order to make it, and to which machines on the shop floor the part should be routed for processing. This information becomes part of the shop work order. The process planning function under RAMP greatly reduces the time and effort required to complete a process plan. Since the PDES file that drives the intelligent processing is 100 percent complete and accurate to start with, the potential for costly errors is greatly diminished.
Epstein, Lawrence J; Valentine, Paul S
2010-05-01
The demand for sleep medicine services has grown tremendously during the last decade and will likely continue. To date, growth in demand has been met by growth in the number of new sleep centers. The need for more new centers will be dependent on market drivers that include increasing regulatory requirements, personnel shortages, integration of home sleep testing, changes in reimbursement, a shift in emphasis from diagnostics to treatment, and an increased consumer focus on sleep. The decision to open a new center should be based on understanding the market dynamics, completing a market analysis, and developing a business plan. The business plan should include an overview of the facility, a personnel and organizational structure, an evaluation of the business environment, a financial plan, a description of services provided, and a strategy for obtaining, managing, and extending a referral base. Implementation of the business plan and successful operation require ongoing planning and monitoring of operational parameters. The need for new sleep centers will likely continue, but the shifting market dynamics indicate a greater need for understanding the marketplace and careful planning.
Löck, Steffen; Roth, Klaus; Skripcak, Tomas; Worbs, Mario; Helmbrecht, Stephan; Jakobi, Annika; Just, Uwe; Krause, Mechthild; Baumann, Michael; Enghardt, Wolfgang; Lühr, Armin
2015-09-01
To guarantee equal access to optimal radiotherapy, a concept of patient assignment to photon or particle radiotherapy using remote treatment plan exchange and comparison - ReCompare - was proposed. We demonstrate the implementation of this concept and present its clinical applicability. The ReCompare concept was implemented using a client-server based software solution. A clinical workflow for the remote treatment plan exchange and comparison was defined. The steps required by the user and performed by the software for a complete plan transfer were described and an additional module for dose-response modeling was added. The ReCompare software was successfully tested in cooperation with three external partner clinics and worked meeting all required specifications. It was compatible with several standard treatment planning systems, ensured patient data protection, and integrated in the clinical workflow. The ReCompare software can be applied to support non-particle radiotherapy institutions with the patient-specific treatment decision on the optimal irradiation modality by remote treatment plan exchange and comparison. Copyright © 2015. Published by Elsevier GmbH.
Human Research Program Integrated Research Plan. Revision A January 2009
NASA Technical Reports Server (NTRS)
2009-01-01
The Integrated Research Plan (IRP) describes the portfolio of Human Research Program (HRP) research and technology tasks. The IRP is the HRP strategic and tactical plan for research necessary to meet HRP requirements. The need to produce an IRP is established in HRP-47052, Human Research Program - Program Plan, and is under configuration management control of the Human Research Program Control Board (HRPCB). Crew health and performance is critical to successful human exploration beyond low Earth orbit. The Human Research Program (HRP) is essential to enabling extended periods of space exploration because it provides knowledge and tools to mitigate risks to human health and performance. Risks include physiological and behavioral effects from radiation and hypogravity environments, as well as unique challenges in medical support, human factors, and behavioral or psychological factors. The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies and tools to enable safe, reliable, and productive human space exploration. Without HRP results, NASA will face unknown and unacceptable risks for mission success and post-mission crew health. This Integrated Research Plan (IRP) describes HRP s approach and research activities that are intended to address the needs of human space exploration and serve HRP customers and how they are integrated to provide a risk mitigation tool. The scope of the IRP is limited to the activities that can be conducted with the resources available to the HRP; it does not contain activities that would be performed if additional resources were available. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration.
Engineering aspects of design and integration of ECE diagnostic in ITER
Udintsev, V. S.; Taylor, G.; Pandya, H. K.B.; ...
2015-03-12
ITER ECE diagnostic [1] needs not only to meet measurement requirements, but also to withstand various loads, such as electromagnetic, mechanical, neutronic and thermal, and to be protected from stray ECH radiation at 170 GHz and other millimeter wave emission, like Collective Thomson scattering which is planned to operate at 60 GHz. Same or similar loads will be applied to other millimetre-wave diagnostics [2], located both in-vessel and in-port plugs. These loads must be taken into account throughout the design phases of the ECE and other microwave diagnostics to ensure their structural integrity and maintainability. The integration of microwave diagnosticsmore » with other ITER systems is another challenging activity which is currently ongoing through port integration and in-vessel integration work. Port Integration has to address the maintenance and the safety aspects of diagnostics, too. Engineering solutions which are being developed to support and to operate ITER ECE diagnostic, whilst complying with safety and maintenance requirements, are discussed in this paper.« less
Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER
NASA Technical Reports Server (NTRS)
Anderson, Herbert A.; Williams, Antony; Pierce, Gregory
2016-01-01
The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.
DOT National Transportation Integrated Search
2009-06-01
Many transportation projects require acquisition of land and accommodation of utility facilities in the : right-of-way. The Federal Highway Administration, American Association of State Highway and : Transportation Officials, and National Cooperative...
A Policy Paper on Applied Education.
ERIC Educational Resources Information Center
Murphy, Jerry
1992-01-01
Applied education, the integration of academic and vocational curricula, cannot supply the trained people needed by a rapidly changing society without sufficient planning and resources. Shortages of skilled workers are a societal issue requiring significant structural adjustment in the way skilled trades are managed. (JOW)
Effective habitat restoration planning requires correctly anticipating demographic responses to altered habitats. New applications of Passive Integrated Transponder (PIT) tag technology to fish-habitat research have provided critical insights into fish movement, growth, and surv...
DOT National Transportation Integrated Search
1999-11-08
In 1996, the Federal Highway Administration awarded a Model Deployment Initiative grant to the Phoenix Metropolitan Area to assist in the deployment and integration of a model Intelligent Transportation System (ITS). Using funding from both the feder...
48 CFR 1352.215-75 - Evaluation criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
... relative importance among the technical evaluation factors.] Based upon the results of the integrated... as the offeror's planned management of consultants and subcontractors, if applicable. Factor 2... likelihood that that offeror can successfully perform the contract requirements and the degree of the risk of...
Wu, Jasmanda; Juhaeri, Juhaeri
2016-12-01
The US Food and Drug Administration (FDA) Amendments Act of 2007 granted the FDA new authorities to enhance drug safety by requiring application holders to submit a proposed Risk Evaluation and Mitigation Strategy (REMS). A REMS is a required risk management plan that uses tools beyond the package insert. REMS elements may include a medication guide and patient package insert for patients and a communication plan focused on health care professionals. Elements to assure safe use (ETASUs) are put in place to mitigate a specific known serious risk when other less restrictive elements of a REMS are not sufficient to mitigate such risk. An implementation system is required for an REMS that includes the ETASUs. With approximately eight years of experience with REMS programs, many health care settings have created systems to manage REMS and also to integrate REMS into their practice settings. At the same time, there are issues associated with the development and implementation of REMS. In 2011, FDA created the REMS Integration Initiative to develop guidance on how to apply statutory criteria to determine when a REMS is required, to improve standardization and assessment of REMS, and to improve integration of REMS into the existing healthcare system. A key component of the REMS Integration Initiative is stakeholder outreach to better understand how existing REMS programs are working and to identify opportunities for improvement. This review attempts to share our company's experience with the REMS program, and to provide updates on FDA's efforts to improve REMS communication, to standardize REMS process, to reduce REMS program burdens and to build a common REMS platform. Copyright © 2016 Elsevier HS Journals, Inc. All rights reserved.
Integration at the round table: marine spatial planning in multi-stakeholder settings.
Olsen, Erik; Fluharty, David; Hoel, Alf Håkon; Hostens, Kristian; Maes, Frank; Pecceu, Ellen
2014-01-01
Marine spatial planning (MSP) is often considered as a pragmatic approach to implement an ecosystem based management in order to manage marine space in a sustainable way. This requires the involvement of multiple actors and stakeholders at various governmental and societal levels. Several factors affect how well the integrated management of marine waters will be achieved, such as different governance settings (division of power between central and local governments), economic activities (and related priorities), external drivers, spatial scales, incentives and objectives, varying approaches to legislation and political will. We compared MSP in Belgium, Norway and the US to illustrate how the integration of stakeholders and governmental levels differs among these countries along the factors mentioned above. Horizontal integration (between sectors) is successful in all three countries, achieved through the use of neutral 'round-table' meeting places for all actors. Vertical integration between government levels varies, with Belgium and Norway having achieved full integration while the US lacks integration of the legislature due to sharp disagreements among stakeholders and unsuccessful partisan leadership. Success factors include political will and leadership, process transparency and stakeholder participation, and should be considered in all MSP development processes.
Integration at the Round Table: Marine Spatial Planning in Multi-Stakeholder Settings
Olsen, Erik; Fluharty, David; Hoel, Alf Håkon; Hostens, Kristian; Maes, Frank; Pecceu, Ellen
2014-01-01
Marine spatial planning (MSP) is often considered as a pragmatic approach to implement an ecosystem based management in order to manage marine space in a sustainable way. This requires the involvement of multiple actors and stakeholders at various governmental and societal levels. Several factors affect how well the integrated management of marine waters will be achieved, such as different governance settings (division of power between central and local governments), economic activities (and related priorities), external drivers, spatial scales, incentives and objectives, varying approaches to legislation and political will. We compared MSP in Belgium, Norway and the US to illustrate how the integration of stakeholders and governmental levels differs among these countries along the factors mentioned above. Horizontal integration (between sectors) is successful in all three countries, achieved through the use of neutral ‘round-table’ meeting places for all actors. Vertical integration between government levels varies, with Belgium and Norway having achieved full integration while the US lacks integration of the legislature due to sharp disagreements among stakeholders and unsuccessful partisan leadership. Success factors include political will and leadership, process transparency and stakeholder participation, and should be considered in all MSP development processes. PMID:25299595
Integrated health practices: development of a graduate nursing program.
Jossens, Marilyn O R; Ganley, Barbara J
2006-01-01
This article describes pedagogical issues in the development of a graduate nursing program in Integrated Health Practices (IHP), reports early experiences in the program, and asserts the importance of a graduate program in the specialty. The experience is described, and unique pedagogical issues encountered are discussed. While noting the contributions made to health and health care by Western medicine and nursing practice, the authors elaborate on the benefits of integrating western health care with less technological, less invasive, and less expensive holistic approaches. Diverse populations often require attention to specific chronic conditions, rather than to acute conditions, and constitutional requirements for overall health may be influenced by diverse health philosophies and practices. These requirements may be grounded in cultural and religious beliefs that must be incorporated into culturally sensitive plans of care. Clinical nurse specialists in IHP can offer knowledge and leadership to nursing practice, which address these complex, yet subtle health care issues.
Juggling Act: Re-Planning and Building on Observatory...Simultaneously!
NASA Technical Reports Server (NTRS)
Zavala, Eddie; Daws, Patricia
2011-01-01
SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.
Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less
1985-03-01
conceptual framwork , and preliminary validation of IAT concepts. Planned work for FY85, including more extensive validation, is also described. 20...Developments: Required Capabilities .... ......... 10 2-1 IAT Conceptual Framework - FY85 (FEO) ..... ........... 11 2-2 Recursive Nature of Decomposition...approach: 1) Identify needs & requirements for IAT. 2) Develop IAT conceptual framework. 3) Validate IAT methods. 4) Develop applications materials. To
CFD Analysis of a Penta-hulled, Air-Entrapment, High-Speed Planning Vessel
2008-03-01
INTRODUCTION A. BACKGROUND The 2007 Total Ship Systems Engineering (TSSE) class was tasked with designing a new riverine craft or specialized...the concept of operations, for our defined system architecture (combined Specialized Command and Control Craft / Mobile Operating Base). This also...of an integration process that requires both systems and equipment optimization while meeting predetermined requirements set for by the Concept of
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barr, Jonathan L.; Tuffner, Francis K.; Hadley, Mark D.
This document contains the Integrated Assessment Plan (IAP) for the Phase 2 Operational Demonstration (OD) of the Smart Power Infrastructure Demonstration for Energy Reliability (SPIDERS) Joint Capability Technology Demonstration (JCTD) project. SPIDERS will be conducted over a three year period with Phase 2 being conducted at Fort Carson, Colorado. This document includes the Operational Demonstration Execution Plan (ODEP) and the Operational Assessment Execution Plan (OAEP), as approved by the Operational Manager (OM) and the Integrated Management Team (IMT). The ODEP describes the process by which the OD is conducted and the OAEP describes the process by which the data collectedmore » from the OD is processed. The execution of the OD, in accordance with the ODEP and the subsequent execution of the OAEP, will generate the necessary data for the Quick Look Report (QLR) and the Utility Assessment Report (UAR). These reports will assess the ability of the SPIDERS JCTD to meet the four critical requirements listed in the Implementation Directive (ID).« less
Performance evaluation of NASA/KSC CAD/CAE graphics local area network
NASA Technical Reports Server (NTRS)
Zobrist, George
1988-01-01
This study had as an objective the performance evaluation of the existing CAD/CAE graphics network at NASA/KSC. This evaluation will also aid in projecting planned expansions, such as the Space Station project on the existing CAD/CAE network. The objectives were achieved by collecting packet traffic on the various integrated sub-networks. This included items, such as total number of packets on the various subnetworks, source/destination of packets, percent utilization of network capacity, peak traffic rates, and packet size distribution. The NASA/KSC LAN was stressed to determine the useable bandwidth of the Ethernet network and an average design station workload was used to project the increased traffic on the existing network and the planned T1 link. This performance evaluation of the network will aid the NASA/KSC network managers in planning for the integration of future workload requirements into the existing network.
Pfitzer, Anne; Mackenzie, Devon; Blanchard, Holly; Hyjazi, Yolande; Kumar, Somesh; Lisanework Kassa, Serawit; Marinduque, Bernabe; Mateo, Marie Grace; Mukarugwiro, Beata; Ngabo, Fidele; Zaeem, Shabana; Zafar, Zonobia; Smith, Jeffrey Michael
2015-06-01
Initiation of family planning at the time of birth is opportune, since few women in low-resource settings who give birth in a facility return for further care. Postpartum family planning (PPFP) and postpartum intrauterine device (PPIUD) services were integrated into maternal care in six low- and middle-income countries, applying an insertion technique developed in Paraguay. Facilities with high delivery volume were selected to integrate PPFP/PPIUD services into routine care. Effective PPFP/PPIUD integration requires training and mentoring those providers assisting women at the time of birth. Ongoing monitoring generated data for advocacy. The percentages of PPIUD acceptors ranged from 2.3% of women counseled in Pakistan to 5.8% in the Philippines. Rates of complications among women returning for follow-up were low. Expulsion rates were 3.7% in Pakistan, 3.6% in Ethiopia, and 1.7% in Guinea and the Philippines. Infection rates did not exceed 1.3%, and three countries recorded no cases. Offering PPFP/PPIUD at birth improves access to contraception. Copyright © 2015. Published by Elsevier Ireland Ltd.
A Science Rationale for Mobility in Planetary Environments
NASA Technical Reports Server (NTRS)
1999-01-01
For the last several decades, the Committee on Planetary and Lunar Exploration (COMPLEX) has advocated a systematic approach to exploration of the solar system; that is, the information and understanding resulting from one mission provide the scientific foundations that motivate subsequent, more elaborate investigations. COMPLEX's 1994 report, An Integrated Strategy for the Planetary Sciences: 1995-2010,1 advocated an approach to planetary studies emphasizing "hypothesizing and comprehending" rather than "cataloging and categorizing." More recently, NASA reports, including The Space Science Enterprise Strategic Plan2 and, in particular, Mission to the Solar System: Exploration and Discovery-A Mission and Technology Roadmap,3 have outlined comprehensive plans for planetary exploration during the next several decades. The missions outlined in these plans are both generally consistent with the priorities outlined in the Integrated Strategy and other NRC reports,4-5 and are replete with examples of devices embodying some degree of mobility in the form of rovers, robotic arms, and the like. Because the change in focus of planetary studies called for in the Integrated Strategy appears to require an evolutionary change in the technical means by which solar system exploration missions are conducted, the Space Studies Board charged COMPLEX to review the science that can be uniquely addressed by mobility in planetary environments. In particular, COMPLEX was asked to address the following questions: (1) What are the practical methods for achieving mobility? (2) For surface missions, what are the associated needs for sample acquisition? (3) What is the state of technology for planetary mobility in the United States and elsewhere, and what are the key requirements for technology development? (4) What terrestrial field demonstrations are required prior to spaceflight missions?
A Scientific Rationale for Mobility in Planetary Environments
NASA Astrophysics Data System (ADS)
1999-01-01
For the last several decades, the COMmittee on Planetary and Lunar EXploration (COMPLEX) has advocated a systematic approach to exploration of the solar system; that is, the information and understanding resulting from one mission provide the scientific foundations that motivate subsequent, more elaborate investigations. COMPLEX's 1994 report, An Integrated Strategy for the Planetary Sciences: 1995-2010,1 advocated an approach to planetary studies emphasizing "hypothesizing and comprehending" rather than "cataloging and categorizing." More recently, NASA reports, including The Space Science Enterprise Strategic Plan' and, in particular, Mission to the Solar System: Exploration and Discovery-A Mission and Technology Roadmap, 3 have outlined comprehensive plans for planetary exploration during the next several decades. The missions outlined in these plans are both generally consistent with the priorities outlined in the Integrated Strategy and other NRC reports,4,5 and are replete with examples of devices embodying some degree of mobility in the form of rovers, robotic arms, and the like. Because the change in focus of planetary studies called for in the Integrated Strategy appears to require an evolutionary change in the technical means by which solar system exploration missions are conducted, the Space Studies Board charged COMPLEX to review the science that can be uniquely addressed by mobility in planetary environments. In particular, COMPLEX was asked to address the following questions: 1. What are the practical methods for achieving mobility? 2. For surface missions, what are the associated needs for sample acquisition? 3. What is the state of technology for planetary mobility in the United States and elsewhere, and what are the key requirements for technology development? 4. What terrestrial field demonstrations are required prior to spaceflight missions?
Dynamic Reconfiguration of the Supplementary Motor Area Network during Imagined Music Performance
Tanaka, Shoji; Kirino, Eiji
2017-01-01
The supplementary motor area (SMA) has been shown to be the center for motor planning and is active during music listening and performance. However, limited data exist on the role of the SMA in music. Music performance requires complex information processing in auditory, visual, spatial, emotional, and motor domains, and this information is integrated for the performance. We hypothesized that the SMA is engaged in multimodal integration of information, distributed across several regions of the brain to prepare for ongoing music performance. To test this hypothesis, functional networks involving the SMA were extracted from functional magnetic resonance imaging (fMRI) data that were acquired from musicians during imagined music performance and during the resting state. Compared with the resting condition, imagined music performance increased connectivity of the SMA with widespread regions in the brain including the sensorimotor cortices, parietal cortex, posterior temporal cortex, occipital cortex, and inferior and dorsolateral prefrontal cortex. Increased connectivity of the SMA with the dorsolateral prefrontal cortex suggests that the SMA is under cognitive control, while increased connectivity with the inferior prefrontal cortex suggests the involvement of syntax processing. Increased connectivity with the parietal cortex, posterior temporal cortex, and occipital cortex is likely for the integration of spatial, emotional, and visual information. Finally, increased connectivity with the sensorimotor cortices was potentially involved with the translation of thought planning into motor programs. Therefore, the reconfiguration of the SMA network observed in this study is considered to reflect the multimodal integration required for imagined and actual music performance. We propose that the SMA network construct “the internal representation of music performance” by integrating multimodal information required for the performance. PMID:29311870
Reducing acquisition risk through integrated systems of systems engineering
NASA Astrophysics Data System (ADS)
Gross, Andrew; Hobson, Brian; Bouwens, Christina
2016-05-01
In the fall of 2015, the Joint Staff J7 (JS J7) sponsored the Bold Quest (BQ) 15.2 event and conducted planning and coordination to combine this event into a joint event with the Army Warfighting Assessment (AWA) 16.1 sponsored by the U.S. Army. This multipurpose event combined a Joint/Coalition exercise (JS J7) with components of testing, training, and experimentation required by the Army. In support of Assistant Secretary of the Army for Acquisition, Logistics, and Technology (ASA(ALT)) System of Systems Engineering and Integration (SoSE&I), Always On-On Demand (AO-OD) used a system of systems (SoS) engineering approach to develop a live, virtual, constructive distributed environment (LVC-DE) to support risk mitigation utilizing this complex and challenging exercise environment for a system preparing to enter limited user test (LUT). AO-OD executed a requirements-based SoS engineering process starting with user needs and objectives from Army Integrated Air and Missile Defense (AIAMD), Patriot units, Coalition Intelligence, Surveillance and Reconnaissance (CISR), Focused End State 4 (FES4) Mission Command (MC) Interoperability with Unified Action Partners (UAP), and Mission Partner Environment (MPE) Integration and Training, Tactics and Procedures (TTP) assessment. The SoS engineering process decomposed the common operational, analytical, and technical requirements, while utilizing the Institute of Electrical and Electronics Engineers (IEEE) Distributed Simulation Engineering and Execution Process (DSEEP) to provide structured accountability for the integration and execution of the AO-OD LVC-DE. As a result of this process implementation, AO-OD successfully planned for, prepared, and executed a distributed simulation support environment that responsively satisfied user needs and objectives, demonstrating the viability of an LVC-DE environment to support multiple user objectives and support risk mitigation activities for systems in the acquisition process.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.
1992-10-01
The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less
Life sciences payload definition and integration study, task C and D. Volume 1: Management summary
NASA Technical Reports Server (NTRS)
1973-01-01
The findings of a study to define the required payloads for conducting life science experiments in space are presented. The primary objectives of the study are: (1) identify research functions to be performed aboard life sciences spacecraft laboratories and necessary equipment, (2) develop conceptual designs of potential payloads, (3) integrate selected laboratory designs with space shuttle configurations, and (4) establish cost analysis of preliminary program planning.
Commerce Lab: Mission analysis. Payload integration study
NASA Technical Reports Server (NTRS)
Marvin, G. D.
1984-01-01
The objectives of the commerce lab mission analysis and payload integration study are discussed. A mission model which accommodates commercial users and provides a basic data base for future mission planning is described. The data bases developed under this study include: (1) user requirements; (2) apparatus capabilities and availabilities; and (3) carrier capabilities. These data bases are synthesized in a trades and analysis phase along with the STS flight opportunities. Optimum missions are identified.
Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project
NASA Technical Reports Server (NTRS)
Griner, James H.
2013-01-01
NASA's UAS Integration in the NAS project, has partnered with Rockwell Collins to develop a concept Control and Non-Payload Communication system prototype radio, operating on recently allocated UAS frequency spectrum bands. The prototype radio will be used to validate initial proposed performance requirements for UAS control communications. This presentation will give an overview of the current status of the design, development, and flight test planning for this prototype radio.
Reusable LH2 tank technology demonstration through ground test
NASA Technical Reports Server (NTRS)
Bianca, C.; Greenberg, H. S.; Johnson, S. E.
1995-01-01
The paper presents the project plan to demonstrate, by March 1997, the reusability of an integrated composite LH2 tank structure, cryogenic insulation, and thermal protection system (TPS). The plan includes establishment of design requirements and a comprehensive trade study to select the most suitable Reusable Hydrogen Composite Tank system (RHCTS) within the most suitable of 4 candidate structural configurations. The 4 vehicles are winged body with the capability to deliver 25,000 lbs of payload to a circular 220 nm, 51.6 degree inclined orbit (also 40,000 lbs to a 28.5 inclined 150 nm orbit). A prototype design of the selected RHCTS is established to identify the construction, fabrication, and stress simulation and test requirements necessary in an 8 foot diameter tank structure/insulation/TPS test article. A comprehensive development test program supports the 8 foot test article development and involves the composite tank itself, cryogenic insulation, and integrated tank/insulation/TPS designs. The 8 foot diameter tank will contain the integrated cryogenic insulation and TPS designs resulting from this development and that of the concurrent lightweight durable TPS program. Tank ground testing will include 330 cycles of LH2 filling, pressurization, body loading, depressurization, draining, and entry heating.
Use of Knowledge Base Systems (EMDS) in Strategic and Tactical Forest Planning
NASA Astrophysics Data System (ADS)
Jensen, M. E.; Reynolds, K.; Stockmann, K.
2008-12-01
The USDA Forest Service 2008 Planning Rule requires Forest plans to provide a strategic vision for maintaining the sustainability of ecological, economic, and social systems across USFS lands through the identification of desired conditions and objectives. In this paper we show how knowledge-based systems can be efficiently used to evaluate disparate natural resource information to assess desired conditions and related objectives in Forest planning. We use the Ecosystem Management Decision Support (EMDS) system (http://www.institute.redlands.edu/emds/), which facilitates development of both logic-based models for evaluating ecosystem sustainability (desired conditions) and decision models to identify priority areas for integrated landscape restoration (objectives). The study area for our analysis spans 1,057 subwatersheds within western Montana and northern Idaho. Results of our study suggest that knowledge-based systems such as EMDS are well suited to both strategic and tactical planning and that the following points merit consideration in future National Forest (and other land management) planning efforts: 1) Logic models provide a consistent, transparent, and reproducible method for evaluating broad propositions about ecosystem sustainability such as: are watershed integrity, ecosystem and species diversity, social opportunities, and economic integrity in good shape across a planning area? The ability to evaluate such propositions in a formal logic framework also allows users the opportunity to evaluate statistical changes in outcomes over time, which could be very useful for regional and national reporting purposes and for addressing litigation; 2) The use of logic and decision models in strategic and tactical Forest planning provides a repository for expert knowledge (corporate memory) that is critical to the evaluation and management of ecosystem sustainability over time. This is especially true for the USFS and other federal resource agencies, which are likely to experience rapid turnover in tenured resource specialist positions within the next five years due to retirements; 3) Use of logic model output in decision models is an efficient method for synthesizing the typically large amounts of information needed to support integrated landscape restoration. Moreover, use of logic and decision models to design customized scenarios for integrated landscape restoration, as we have demonstrated with EMDS, offers substantial improvements to traditional GIS-based procedures such as suitability analysis. To our knowledge, this study represents the first attempt to link evaluations of desired conditions for ecosystem sustainability in strategic planning to tactical planning regarding the location of subwatersheds that best meet the objectives of integrated landscape restoration. The basic knowledge-based approach implemented in EMDS, with its logic (NetWeaver) and decision (Criterion Decision Plus) engines, is well suited both to multi-scale strategic planning and to multi-resource tactical planning.
2011-03-31
protocols conducted in Iraq. His office had been designated by the 1 A research protocol is a formal document detailing the study methodology and the...Human Research Protections Program plan requires scientific peer review to ensure that research is scientifically sound in its design and methods, and...ofthe approved research protocol and IRB minutes, revealed that there was no mention of "active rehabilitation and exercise" under the design
The Home Stretch Almost! Science with the Hubble and James Webb Space Telescope V
NASA Technical Reports Server (NTRS)
Ochs, Bill
2017-01-01
JWST has Made tremendous progress in the last few years. JWST Is fully immersed in integration and test, but testing JWST is a formable challenge. JWST's size, complexity, and cryogenic characteristics require a multifaceted test plan to verify mission readiness. Each of these tests are opportunities to uncover issues which must be corrected to be able to move forward. All observatory control, science planning, and science data processing operational systems are on schedule.?
1991-09-01
putting all tasks directed towsrds achieving an outcome in aequence. The tasks can be viewed as steps in the process (39:2.3). Using this...improvement opportunity is investigated. A plan is developed, root causes are identified, and solutions are tested and implemented. The process is... solutions , check for actual improvement, and integrate the successful improvements into the process. ?UP 7. Check Improvement Performance. Finally, the
A Successful Infusion Process for Enabling Lunar Exploration Technologies
NASA Technical Reports Server (NTRS)
Over, Ann P.; Klem, Mark K.; Motil, Susan M.
2008-01-01
The NASA Vision for Space Exploration begins with a more reliable flight capability to the International Space Station and ends with sending humans to Mars. An important stepping stone on the path to Mars encompasses human missions to the Moon. There is little doubt throughout the stakeholder community that new technologies will be required to enable this Vision. However, there are many factors that influence the ability to successfully infuse any technology including the technical risk, requirement and development schedule maturity, and, funds available. This paper focuses on effective infusion processes that have been used recently for the technologies in development for the lunar exploration flight program, Constellation. Recent successes with Constellation customers are highlighted for the Exploration Technology Development Program (ETDP) Projects managed by NASA Glenn Research Center (GRC). Following an overview of the technical context of both the flight program and the technology capability mapping, the process is described for how to effectively build an integrated technology infusion plan. The process starts with a sound risk development plan and is completed with an integrated project plan, including content, schedule and cost. In reality, the available resources for this development are going to change over time, necessitating some level of iteration in the planning. However, the driving process is based on the initial risk assessment, which changes only when the overall architecture changes, enabling some level of stability in the process.
2011-04-05
C t r Source Integrated Security Posture Defense Planning Scenario April 2008 28 Using selected DoD planning scenarios8 that cover the...Military Sourcing for DoD Humanitarian Crisis Response D C R Mil t r S r i 1. AC primary source for DoD response 2. Some pre-planned RC required...immediately 3. Most RC follow on CRISIS + 30 DAYS Days N o ti o n a l P e rc e n t o f T o ta l F o rc e President Invokes PRC
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
40 CFR 63.7800 - What are my operation and maintenance requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...
76 FR 39470 - Integrated Resource Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... region's natural resources. One component of this mission is the generation, transmission, and sale of reliable and affordable electric energy. TVA operates the nation's largest public power system, producing 4... 56 directly served large industrial and Federal customers. The TVA Act requires the TVA power system...
Integrating Local Public Health Agencies into the Homeland Security Community
2007-03-01
public health needs that require attention (such as poor prenatal health, teen pregnancy , and sexually transmitted diseases) it is not difficult to...11 2. Education ... relationships and improved planning and response capabilities. Public health agencies are diverse organizations administrating multiple health programs
Hackl, W O; Ammenwerth, E
2016-01-01
Secondary use of clinical routine data is receiving an increasing amount of attention in biomedicine and healthcare. However, building and analysing integrated clinical routine data repositories are nontrivial, challenging tasks. As in most evolving fields, recognized standards, well-proven methodological frameworks, or accurately described best-practice approaches for the systematic planning of solutions for secondary use of routine medical record data are missing. We propose a conceptual best-practice framework and procedure model for the systematic planning of intelligent reuse of integrated clinical routine data (SPIRIT). SPIRIT was developed based on a broad literature overview and further refined in two case studies with different kinds of clinical routine data, including process-oriented nursing data from a large hospital group and high-volume multimodal clinical data from a neurologic intensive care unit. SPIRIT aims at tailoring secondary use solutions to specific needs of single departments without losing sight of the institution as a whole. It provides a general conceptual best-practice framework consisting of three parts: First, a secondary use strategy for the whole organization is determined. Second, comprehensive analyses are conducted from two different viewpoints to define the requirements regarding a clinical routine data reuse solution at the system level from the data perspective (BOTTOM UP) and at the strategic level from the future users perspective (TOP DOWN). An obligatory clinical context analysis (IN BETWEEN) facilitates refinement, combination, and integration of the different requirements. The third part of SPIRIT is dedicated to implementation, which comprises design and realization of clinical data integration and management as well as data analysis solutions. The SPIRIT framework is intended to be used to systematically plan the intelligent reuse of clinical routine data for multiple purposes, which often was not intended when the primary clinical documentation systems were implemented. SPIRIT helps to overcome this gap. It can be applied in healthcare institutions of any size or specialization and allows a stepwise setup and evolution of holistic clinical routine data reuse solutions.
Aging management program of the reactor building concrete at Point Lepreau Generating Station
NASA Astrophysics Data System (ADS)
Aldea, C.-M.; Shenton, B.; Demerchant, M. M.; Gendron, T.
2011-04-01
In order for New Brunswick Power Nuclear (NBPN) to control the risks of degradation of the concrete reactor building at the Point Lepreau Generating Station (PLGS) the development of an aging management plan (AMP) was initiated. The intention of this plan was to determine the requirements for specific structural components of concrete of the reactor building that require regular inspection and maintenance to ensure the safe and reliable operation of the plant. The document is currently in draft form and presents an integrated methodology for the application of an AMP for the concrete of the reactor building. The current AMP addresses the reactor building structure and various components, such as joint sealant and liners that are integral to the structure. It does not include internal components housed within the structure. This paper provides background information regarding the document developed and the strategy developed to manage potential degradation of the concrete of the reactor building, as well as specific programs and preventive and corrective maintenance activities initiated.
Strategic planning of developing automatic optical inspection (AOI) technologies in Taiwan
NASA Astrophysics Data System (ADS)
Fan, K. C.; Hsu, C.
2005-01-01
In most domestic hi-tech industries in Taiwan, the automatic optical inspection (AOI) equipment is mostly imported. In view of the required specifications, AOI consists of the integration of mechanical-electrical-optical-information technologies. In the past two decades, traditional industries have lost their competitiveness due to the low profit rate. It is possible to promote a new AOI industry in Taiwan through the integration of its strong background in mechatronic technology in positioning stages with the optical image processing techniques. The market requirements are huge not only in domestic need but also in global need. This is the main reason to promote the AOI research for the coming years in Taiwan. Focused industrial applications will be in IC, PCB, LCD, communication, and MEMS parts. This paper will analyze the domestic and global AOI equipment market, summarize the necessary fish bone technology diagrams, survey the actual industrial needs, and propose the strategic plan to be promoted in Taiwan.
NASA Technical Reports Server (NTRS)
Ary, A.; Axtell, C.; Fogg, L.; Jackson, A.; James, A. M.; Mosesian, B.; Vanderwier, J.; Vanhamersveld, J.
1976-01-01
The empennage component selected for this program is the vertical fin box of the L-1011 aircraft. The box structure extends from the fuselage production joint to the tip rib and includes the front and rear spars. Various design options were evaluated to arrive at a configuration which would offer the highest potential for satisfying program objectives. The preferred configuration selected consists of a hat-stiffened cover with molded integrally stiffened spars, aluminum trussed composite ribs, and composite miniwich web ribs with integrally molded caps. Material screening tests were performed to select an advanced composite material system for the Advanced Composite Vertical Fin (ACFV) that would meet the program requirements from the standpoint of quality, reproducibility, and cost. Preliminary weight and cost analysis were made, targets established, and tracking plans developed. These include FAA certification, ancillary test program, quality control, and structural integrity control plans.
Medical Devices Transition to Information Systems: Lessons Learned
Charters, Kathleen G.
2012-01-01
Medical devices designed to network can share data with a Clinical Information System (CIS), making that data available within clinician workflow. Some lessons learned by transitioning anesthesia reporting and monitoring devices (ARMDs) on a local area network (LAN) to integration of anesthesia documentation within a CIS include the following categories: access, contracting, deployment, implementation, planning, security, support, training and workflow integration. Areas identified for improvement include: Vendor requirements for access reconciled with the organizations’ security policies and procedures. Include clauses supporting transition from stand-alone devices to information integrated into clinical workflow in the medical device procurement contract. Resolve deployment and implementation barriers that make the process less efficient and more costly. Include effective field communication and creative alternatives in planning. Build training on the baseline knowledge of trainees. Include effective help desk processes and metrics. Have a process for determining where problems originate when systems share information. PMID:24199054
NASA's Next Generation Space Geodesy Program
NASA Technical Reports Server (NTRS)
Pearlman, M. R.; Frey, H. V.; Gross, R. S.; Lemoine, F. G.; Long, J. L.; Ma, C.; McGarry J. F.; Merkowitz, S. M.; Noll, C. E.; Pavilis, E. C.;
2012-01-01
Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard s Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA s contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.
NASA's Next Generation Space Geodesy Program
NASA Technical Reports Server (NTRS)
Merkowitz, S. M.; Desai, S. D.; Gross, R. S.; Hillard, L. M.; Lemoine, F. G.; Long, J. L.; Ma, C.; McGarry, J. F.; Murphy, D.; Noll, C. E.;
2012-01-01
Requirements for the ITRF have increased dramatically since the 1980s. The most stringent requirement comes from critical sea level monitoring programs: a global accuracy of 1.0 mm, and 0.1mm/yr stability, a factor of 10 to 20 beyond current capability. Other requirements for the ITRF coming from ice mass change, ground motion, and mass transport studies are similar. Current and future satellite missions will have ever-increasing measurement capability and will lead to increasingly sophisticated models of these and other changes in the Earth system. Ground space geodesy networks with enhanced measurement capability will be essential to meeting the ITRF requirements and properly interpreting the satellite data. These networks must be globally distributed and built for longevity, to provide the robust data necessary to generate improved models for proper interpretation of the observed geophysical signals. NASA has embarked on a Space Geodesy Program with a long-range goal to build, deploy and operate a next generation NASA Space Geodetic Network (SGN). The plan is to build integrated, multi-technique next-generation space geodetic observing systems as the core contribution to a global network designed to produce the higher quality data required to maintain the Terrestrial Reference Frame and provide information essential for fully realizing the measurement potential of the current and coming generation of Earth Observing spacecraft. Phase 1 of this project has been funded to (1) Establish and demonstrate a next-generation prototype integrated Space Geodetic Station at Goddard's Geophysical and Astronomical Observatory (GGAO), including next-generation SLR and VLBI systems along with modern GNSS and DORIS; (2) Complete ongoing Network Design Studies that describe the appropriate number and distribution of next-generation Space Geodetic Stations for an improved global network; (3) Upgrade analysis capability to handle the next-generation data; (4) Implement a modern survey system to measure inter-technique vectors for co-location; and (5) Develop an Implementation Plan to build, deploy and operate a next-generation integrated NASA SGN that will serve as NASA's contribution to the international global geodetic network. An envisioned Phase 2 (which is not currently funded) would include the replication of up to ten such stations to be deployed either as integrated units or as a complement to already in-place components provided by other organizations. This talk will give an update on the activities underway and the plans for completion.
NASA Technical Reports Server (NTRS)
Wright, Michael R.
1999-01-01
With over two dozen missions since the first in 1986, the Hitchhiker project has a reputation for providing quick-reaction, low-cost flight services for Shuttle Small Payloads Project (SSPP) customers. Despite the successes, several potential improvements in customer payload integration and test (I&T) deserve consideration. This paper presents suggestions to Hitchhiker customers on how to help make the I&T process run smoother. Included are: customer requirements and interface definition, pre-integration test and evaluation, configuration management, I&T overview and planning, problem mitigation, and organizational communication. In this era of limited flight opportunities and new ISO-based requirements, issues such as these have become more important than ever.
Schramm, Paul J.; Luber, George
2014-01-01
Climate change will likely have adverse human health effects that require federal agency involvement in adaptation activities. In 2009, President Obama issued Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. The order required federal agencies to develop and implement climate change adaptation plans. The Centers for Disease Control and Prevention (CDC), as part of a larger Department of Health and Human Services response to climate change, is developing such plans. We provide background on Executive Orders, outline tenets of climate change adaptation, discuss public health adaptation planning at both the Department of Health and Human Services and the CDC, and outline possible future CDC efforts. We also consider how these activities may be better integrated with other adaptation activities that manage emerging health threats posed by climate change. PMID:24432931
Hess, Jeremy J; Schramm, Paul J; Luber, George
2014-03-01
Climate change will likely have adverse human health effects that require federal agency involvement in adaptation activities. In 2009, President Obama issued Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance. The order required federal agencies to develop and implement climate change adaptation plans. The Centers for Disease Control and Prevention (CDC), as part of a larger Department of Health and Human Services response to climate change, is developing such plans. We provide background on Executive Orders, outline tenets of climate change adaptation, discuss public health adaptation planning at both the Department of Health and Human Services and the CDC, and outline possible future CDC efforts. We also consider how these activities may be better integrated with other adaptation activities that manage emerging health threats posed by climate change.
Solid waste management complex site development plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greager, T.M.
1994-09-30
The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less
Integrated planning and spatial evaluation of megasite remediation and reuse options
NASA Astrophysics Data System (ADS)
Schädler, Sebastian; Morio, Maximilian; Bartke, Stephan; Finkel, Michael
2012-01-01
Redevelopment of large contaminated brownfields (megasites) is often hampered by a lack of communication and harmonization among diverse stakeholders with potentially conflicting interests. Decision support is required to provide integrative yet transparent evaluation of often complex spatial information to stakeholders with different areas of expertise. It is considered crucial for successful redevelopment to identify a shared vision of how the respective contaminated site could be remediated and redeveloped. We describe a framework of assessment methods and models that analyzes and visualizes site- and land use-specific spatial information at the screening level, with the aim to support the derivation of recommendable land use layouts and to initiate further and more detailed planning. The framework integrates a GIS-based identification of areas to be remediated, an estimation of associated clean-up costs, a spatially explicit market value appraisal, and an assessment of the planned future land use's contribution to sustainable urban and regional development. Case study results show that derived options are potentially favorable in both a sustainability and an economic sense and that iterative re-planning is facilitated by the evaluation and visualization of economic, ecological and socio-economic aspects. The framework supports an efficient early judgment about whether and how abandoned land may be assigned a sustainable and marketable land use.
Kimura, Joe; DaSilva, Karen; Marshall, Richard
2008-02-01
The increasing prevalence of chronic illnesses in the United States requires a fundamental redesign of the primary care delivery system's structure and processes in order to meet the changing needs and expectations of patients. Population management, systems-based practice, and planned chronic illness care are 3 potential processes that can be integrated into primary care and are compatible with the Chronic Care Model. In 2003, Harvard Vanguard Medical Associates, a multispecialty ambulatory physician group practice based in Boston, Massachusetts, began implementing all 3 processes across its primary care practices. From 2004 to 2006, the overall diabetes composite quality measures improved from 51% to 58% for screening (HgA1c x 2, low-density lipoprotein, blood pressure in 12 months) and from 13% to 17% for intermediate outcomes (HgA1c
Classen, Sherrilene; Lopez, Ellen DS; Winter, Sandra; Awadzi, Kezia D; Ferree, Nita; Garvan, Cynthia W
2007-01-01
The topic of motor vehicle crashes among the elderly is dynamic and multi-faceted requiring a comprehensive and synergistic approach to intervention planning. This approach must be based on the values of a given population as well as health statistics and asserted through community, organizational and policy strategies. An integrated summary of the predictors (quantitative research), and views (qualitative research) of the older drivers and their stakeholders, does not currently exist. This study provided an explicit socio-ecological view explaining the interrelation of possible causative factors, an integrated summary of these causative factors, and empirical guidelines for developing public health interventions to promote older driver safety. Using a mixed methods approach, we were able to compare and integrate main findings from a national crash dataset with perspectives of stakeholders. We identified: 11 multi-causal factors for safe elderly driving; the importance of the environmental factors - previously underrated in the literature- interacting with behavioral and health factors; and the interrelatedness among many socio-ecological factors. For the first time, to our knowledge, we conceptualized the fundamental elements of a multi-causal health promotion plan, with measurable intermediate and long-term outcomes. After completing the detailed plan we will test the effectiveness of this intervention on multiple levels. PMID:18225470
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Ivancic, William D.; Zuzek, John E.
1991-01-01
The development of new space communications technologies by NASA has included both commercial applications and space science requirements. NASA's Systems Integration, Test and Evaluation (SITE) Space Communication System Simulator is a hardware based laboratory simulator for evaluating space communications technologies at the component, subsystem, system, and network level, geared toward high frequency, high data rate systems. The SITE facility is well-suited for evaluation of the new technologies required for the Space Exploration Initiative (SEI) and advanced commercial systems. Described here are the technology developments and evaluation requirements for current and planned commercial and space science programs. Also examined are the capabilities of SITE, the past, present and planned future configurations of the SITE facility, and applications of SITE to evaluation of SEI technology.
Commerce Laboratory: Mission analysis payload integration study
NASA Technical Reports Server (NTRS)
Bannister, T. C.
1984-01-01
A mission model which will accommodate commercial users and provide a basic data base for further mission planning is reported. The data bases to be developed are: (1) user requirements; (2) apparatus capabilities and availabilities; and (3) carrier capabilities. These data bases are synthesized in a trades and analysis phase along with the STS flight apparatus, and optimum missions will be identified. The completed work is reported. The user requirements data base was expanded to identify within the six scientific disciplines the areas of investigation, investigation categories and status, potential commercial application, interested parties, process, and experiment requirements. The scope of the apparatus data base was expanded to indicate apparatus status as to whether it is ground or flight equipment and, within both categories, whether the apparatus is: (1) existing, (2) under development, (3) planned, or (4) needed. Applications for the apparatus are listed. The methodology is revised in the areas of trades and analysis and mission planning. The carrier capabilities data base was updated and completed.
Relay Sequence Generation Software
NASA Technical Reports Server (NTRS)
Gladden, Roy E.; Khanampompan, Teerapat
2009-01-01
Due to thermal and electromagnetic interactivity between the UHF (ultrahigh frequency) radio onboard the Mars Reconnaissance Orbiter (MRO), which performs relay sessions with the Martian landers, and the remainder of the MRO payloads, it is required to integrate and de-conflict relay sessions with the MRO science plan. The MRO relay SASF/PTF (spacecraft activity sequence file/ payload target file) generation software facilitates this process by generating a PTF that is needed to integrate the periods of time during which MRO supports relay activities with the rest of the MRO science plans. The software also generates the needed command products that initiate the relay sessions, some features of which are provided by the lander team, some are managed by MRO internally, and some being derived.
Everyday robotic action: lessons from human action control
de Kleijn, Roy; Kachergis, George; Hommel, Bernhard
2014-01-01
Robots are increasingly capable of performing everyday human activities such as cooking, cleaning, and doing the laundry. This requires the real-time planning and execution of complex, temporally extended sequential actions under high degrees of uncertainty, which provides many challenges to traditional approaches to robot action control. We argue that important lessons in this respect can be learned from research on human action control. We provide a brief overview of available psychological insights into this issue and focus on four principles that we think could be particularly beneficial for robot control: the integration of symbolic and subsymbolic planning of action sequences, the integration of feedforward and feedback control, the clustering of complex actions into subcomponents, and the contextualization of action-control structures through goal representations. PMID:24672474
Advanced optical manufacturing digital integrated system
NASA Astrophysics Data System (ADS)
Tao, Yizheng; Li, Xinglan; Li, Wei; Tang, Dingyong
2012-10-01
It is necessarily to adapt development of advanced optical manufacturing technology with modern science technology development. To solved these problems which low of ration, ratio of finished product, repetition, consistent in big size and high precision in advanced optical component manufacturing. Applied business driven and method of Rational Unified Process, this paper has researched advanced optical manufacturing process flow, requirement of Advanced Optical Manufacturing integrated System, and put forward architecture and key technology of it. Designed Optical component core and Manufacturing process driven of Advanced Optical Manufacturing Digital Integrated System. the result displayed effective well, realized dynamic planning Manufacturing process, information integration improved ratio of production manufactory.
NASA Technical Reports Server (NTRS)
Salerno, L. J.; White, S. M.; Helvensteijn, B. P. M.
2000-01-01
NASA's planned advanced space transportation vehicles will benefit from the use of integral/conformal cryogenic propellant tanks which will reduce the launch weight and lower the earth-to-orbit costs considerably. To implement the novel concept of integral/conformal tanks requires developing an equally novel concept in thermal protection materials. Providing insulation against reentry heating and preserving propellant mass can no longer be considered separate problems to be handled by separate materials. A new family of materials, Superthermal Insulation (STI), has been conceiving and investigated by NASA's Ames Research Center to simultaneously provide both thermal protection and cryogenic insulation in a single, integral material.
Impairments in Skin Integrity.
Murphree, Rose W
2017-09-01
Altered skin integrity increases the chance of infection, impaired mobility, and decreased function and may result in the loss of limb or, sometimes, life. Skin is affected by both intrinsic and extrinsic factors. Intrinsic factors can include altered nutritional status, vascular disease issues, and diabetes. Extrinsic factors include falls, accidents, pressure, immobility, and surgical procedures. Ensuring skin integrity in the elderly requires a team approach and includes the individual, caregivers, and clinicians. The twenty-first century clinician has several online, evidence-based tools to assist with optimal treatment plans. Understanding best practices in addressing skin integrity issues can promote positive outcomes with the elderly. Copyright © 2017 Elsevier Inc. All rights reserved.
Flight test evaluation of the E-systems Differential GPS category 3 automatic landing system
NASA Technical Reports Server (NTRS)
Kaufmann, David N.; Mcnally, B. David
1995-01-01
Test flights were conducted to evaluate the capability of Differential Global Positioning System (DGPS) to provide the accuracy and integrity required for International Civil Aviation Organization (ICAO) Category (CAT) III precision approach and landings. These test flights were part of a Federal Aviation Administration (FAA) program to evaluate the technical feasibility of using DGPS based technology for CAT III precision approach and landing applications. An IAI Westwind 1124 aircraft (N24RH) was equipped with DGPS receiving equipment and additional computing capability provided by E-Systems. The test flights were conducted at NASA Ames Research Center's Crows Landing Flight Facility, Crows Landing, California. The flight test evaluation was based on completing 100 approaches and landings. The navigation sensor error accuracy requirements were based on ICAO requirements for the Microwave Landing System (MLS). All of the approaches and landings were evaluated against ground truth reference data provided by a laser tracker. Analysis of these approaches and landings shows that the E-Systems DGPS system met the navigation sensor error requirements for a successful approach and landing 98 out of 100 approaches and landings, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan. In addition, the E-Systems DGPS system met the integrity requirements for a successful approach and landing or stationary trial for all 100 approaches and landings and all ten stationary trials, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan.
Integrated Medical Model Verification, Validation, and Credibility
NASA Technical Reports Server (NTRS)
Walton, Marlei; Kerstman, Eric; Foy, Millennia; Shah, Ronak; Saile, Lynn; Boley, Lynn; Butler, Doug; Myers, Jerry
2014-01-01
The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.
NASA Technical Reports Server (NTRS)
Steinbronn, O.
1983-01-01
The following types of space missions were evaluated to determine those that require, or will be benefited materially, by a manned space station: (1) science and applications, (2) commercial, (3) technology development, (4) space operations, and (5) national security. Integrated mission requirements for man-operated and man-tended free-flying missions were addressed. A manned space station will provide major performance and economic benefits to a wide range of missions planned for the 1990s.
Integrated management of depression: improving system quality and creating effective interfaces.
Myette, Thomas L
2008-04-01
Depression is a chronic recurrent condition and is a leading cause of work disability. Improving occupational outcomes for depression will require an integrated approach that incorporates best practices from the clinical, community, and workplace systems. This article briefly reviews recent quality improvement initiatives and promising practices in each system and then shifts to the importance of systems integration. An integrated chronic care model uses a sophisticated case management process to support essential relationships, facilitate key plans, and efficiently link the three systems to optimize clinical, economic, and occupational outcomes. An expanded role for employers and their agents in the management of depression and other chronic diseases is seen as fundamental to maintaining a healthy and productive workforce. To improve occupational outcomes for depression by integrating best practices from the clinical, community, and workplace systems. After a brief review of quality improvement initiatives and promising practices in each system, an integrated chronic care model is introduced. A case management process that links critical systems, supports essential relationships, and facilitates key plans is expected to result in improvements in clinical, economic, and occupational outcomes. Employers should be more engaged with clinical and community partners in the prevention and control of depression in affected employees.
A planning comparison of 7 irradiation options allowed in RTOG 1005 for early-stage breast cancer.
Chen, Guang-Pei; Liu, Feng; White, Julia; Vicini, Frank A; Freedman, Gary M; Arthur, Douglas W; Li, X Allen
2015-01-01
This study compared the 7 treatment plan options in achieving the dose-volume criteria required by the Radiation Therapy Oncology Group (RTOG) 1005 protocol. Dosimetry plans were generated for 15 representative patients with early-stage breast cancer (ESBC) based on the protocol-required dose-volume criteria for each of the following 7 treatment options: 3D conformal radiotherapy (3DCRT), whole-breast irradiation (WBI) plus 3DCRT lumpectomy boost, 3DCRT WBI plus electron boost, 3DCRT WBI plus intensity-modulated radiation therapy (IMRT) boost, IMRT WBI plus 3DCRT boost, IMRT WBI plus electron boost, IMRT WBI plus IMRT boost, and simultaneous integrated boost (SIB) with IMRT. A variety of dose-volume parameters, including target dose conformity and uniformity and normal tissue sparing, were compared for these plans. For the patients studied, all plans met the required acceptable dose-volume criteria, with most of them meeting the ideal criteria. When averaged over patients, most dose-volume goals for all plan options can be achieved with a positive gap of at least a few tenths of standard deviations. The plans for all 7 options are generally comparable. The dose-volume goals required by the protocol can in general be easily achieved. IMRT WBI provides better whole-breast dose uniformity than 3DCRT WBI does, but it causes no significant difference for the dose conformity. All plan options are comparable for lumpectomy dose uniformity and conformity. Patient anatomy is always an important factor when whole-breast dose uniformity and conformity and lumpectomy dose conformity are considered. Copyright © 2015 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.
Preliminary test results from the CELSS Test Facility Engineering Development Unit
NASA Technical Reports Server (NTRS)
Kliss, Mark H.; Macelroy, R. D.; Blackwell, C. C.; Borchers, B. A.; Drews, M. E.; Longabaugh, J. R.; Yendler, B. S.; Zografos, A. I.
1994-01-01
As part of the NASA Controlled Ecological Life Support System (CELSS) Program, a CELSS Test Facility (CTF) is being planned for installation on the Space Station. The CTF will be used to provide data on the productivity and efficiency of a variety of CELSS higher plant crops grown in the microgravity environment of the Space Station. Tight environmental control will be maintained while data on gas exchange rates and biomass accumulation rates are collected. In order to obtain an early realistic determination of the subsystem and system requirements necessary to provide the environmental conditions specified for CTF crop productivity experiments, an Engineering Development Unit (EDU) has been designed, constructed and is in the process of subsystem and system testing at NASA Ames Research Center. The EDU is a ground test-bed which will be used to characterize the integrated performance of major subsystem technologies, to evaluate hardware candidates and control strategies required for the CTF, and to further define the ability to meet CTF requirements within present Space Station constraints. This paper reviews the functional requirements for the EDU, and focuses on the performance evaluation and test results of the various subsystems. Preliminary integrated performance results and control system operation are addressed, and plans for future science and technology testing are discussed.
NASA Technical Reports Server (NTRS)
Davidoff, Larry D.; Reichert, Jack M.
1999-01-01
NASA continues to focus on improving safety and reliability while reducing the annual cost of meeting human space flight and unique ISS and exploration needs. NASA's Space Transportation Architecture Study (STAS) Phase 2 in early 1998 focused on space transportation options. Subsequently, NASA directed parallel industry and government teams to conduct the Integrated Space Transportation Plan effort (STAS Phase 3). The objective of ISTP was to develop technology requirements, roadmaps, and risk reduction portfolio that considered expanded definition of "clean-sheet" and Shuttle-derived second generation ETO transportation systems in support of a 2005 RLV competition for NASA missions beginning 2010. NASA provided top-level requirements for improvements in safety, reliability, and cost and a set of design reference missions representing NASA ISS, human exploration, commercial, and other civil and government needs. This paper addresses the challenges of meeting NASA's objectives while servicing the varied market segments represented in the ISTP design reference missions and provides a summary of technology development needs and candidate system concepts. A comparison of driving requirements, architectures and technology needs is discussed and descriptions of viable Shuttle-derived and next generation systems to meet the market needs are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Garrett, Richard L.; Niemi, Belinda J.; Paik, Ingle K.
2013-11-07
A Comparative Evaluation was conducted for One System Integrated Project Team to compare the safety bases for the Hanford Waste Treatment and Immobilization Plant Project (WTP) and Tank Operations Contract (TOC) (i.e., Tank Farms) by an Expert Review Team. The evaluation had an overarching purpose to facilitate effective integration between WTP and TOC safety bases. It was to provide One System management with an objective evaluation of identified differences in safety basis process requirements, guidance, direction, procedures, and products (including safety controls, key safety basis inputs and assumptions, and consequence calculation methodologies) between WTP and TOC. The evaluation identified 25more » recommendations (Opportunities for Integration). The resolution of these recommendations resulted in 16 implementation plans. The completion of these implementation plans will help ensure consistent safety bases for WTP and TOC along with consistent safety basis processes. procedures, and analyses. and should increase the likelihood of a successful startup of the WTP. This early integration will result in long-term cost savings and significant operational improvements. In addition, the implementation plans lead to the development of eight new safety analysis methodologies that can be used at other U.S. Department of Energy (US DOE) complex sites where URS Corporation is involved.« less
U.S. Dental Schools' Preparation for the Integrated National Board Dental Examination.
Duong, Mai-Ly T; Cothron, Annaliese E; Lawson, Nathaniel C; Doherty, Eileen H
2018-03-01
An Integrated National Board Dental Examination (INBDE) combining basic, behavioral, and clinical sciences will be implemented in 2020 to replace the current two-part National Board Dental Examination required for all candidates who seek to practice dentistry in the U.S. The aims of this study were to determine how U.S. dental schools are preparing for implementation of the INBDE and to assess their top administrators' attitudes about the new exam. A total of 150 deans, academic deans, and other administrators at all 64 U.S. dental schools with graduating classes in 2016 were emailed a 19-question electronic survey. The survey questions addressed the respondents' level of support, perceived benefits and challenges, and planned preparation strategies for the INBDE. The individual response rate was 59%, representing 57 of the 64 schools. Approximately 60% of the respondents either agreed or strongly agreed that they support the integrated exam, while roughly 25% either somewhat or strongly disagreed. While most respondents (72%) reported that their institutions would be prepared for the INBDE, 74% reported that the merged exam created additional strain for their institutions. Respondents reported viewing content integration and clinical applicability as benefits of the INBDE, while required curriculum changes and student preparedness and stress were seen as challenges. Most of the respondents reported their schools were currently employing strategies to prepare for the INBDE including meetings with faculty and students and changes to curricula and course content. The beginning of the fourth year and the end of the third year were the most frequently reported times when schools planned to require students to take the INBDE, although almost half of the respondents did not yet know what it would be required at their school. Several schools were reconsidering using the boards as a passing requirement. This study found that support for the INBDE was not universal, but strategies are under way to prepare students, faculty, and curricula for this new means of assessment.
Montana Health Enhancement...An Expanded Concept: Assessment and Planning.
ERIC Educational Resources Information Center
Montana State Dept. of Public Instruction, Helena.
Comprehensive health enhancement programs (CHEPs) are a curricular area required by new Montana accreditation standards. The curriculum combines the disciplines of health and physical education into an integrated, holistic, health-oriented program. A CHEP incorporates an expanded concept of health services--healthy school environment, employee…
ERIC Educational Resources Information Center
Collier-Meek, Melissa A.; Sanetti, Lisa M. H.; Boyle, Ashley M.
2016-01-01
To deliver interventions completely and consistently (i.e., with adequate treatment integrity) and, thus, have a positive impact on student outcomes, implementers, such as teachers and paraprofessionals, often require support. To efficiently deliver implementation support, school psychologists could embed research-based strategies into their…
Code of Federal Regulations, 2013 CFR
2013-10-01
... establish the environment, safety, and health portion of the list identified in paragraph (b) of this section. (d) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under a..., Integration of Environment, Safety, and Health into Work Planning and Execution. When such a process is used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... establish the environment, safety, and health portion of the list identified in paragraph (b) of this section. (d) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under a..., Integration of Environment, Safety, and Health into Work Planning and Execution. When such a process is used...
Code of Federal Regulations, 2014 CFR
2014-10-01
... establish the environment, safety, and health portion of the list identified in paragraph (b) of this section. (d) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under a..., Integration of Environment, Safety, and Health into Work Planning and Execution. When such a process is used...
Code of Federal Regulations, 2011 CFR
2011-10-01
... establish the environment, safety, and health portion of the list identified in paragraph (b) of this section. (d) Environmental, safety, and health (ES&H) requirements appropriate for work conducted under a..., Integration of Environment, Safety, and Health into Work Planning and Execution. When such a process is used...
Balancing Multiple Needs through Innovative Facility Design.
ERIC Educational Resources Information Center
Romano, C. Renee; Hanish, Jan
2003-01-01
Designing buildings that incorporate and integrate a number of departments and functions is one way that colleges and universities are balancing financial challenges and facility needs. These buildings can transform the campus, but they require planning and coordination from a carefully assembled design team. (Contains 18 references.) (Author)
77 FR 21778 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
... the integrity of ACF's award selection process. All ACF discretionary grant programs are required to... Standard Form 424 series, which requests basic information, budget information, and assurances; the Project... Administration for Children and Families, Office of Planning, Research and Evaluation, 370 L'Enfant Promenade SW...
NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.
DOE Office of Scientific and Technical Information (OSTI.GOV)
GREEN,T.ET AL.
2003-12-31
Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetationmore » of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.« less
IAC level "O" program development
NASA Technical Reports Server (NTRS)
Vos, R. G.
1982-01-01
The current status of the IAC development activity is summarized. The listed prototype software and documentation was delivered, and details were planned for development of the level 1 operational system. The planned end product IAC is required to support LSST design analysis and performance evaluation, with emphasis on the coupling of required technical disciplines. The long term IAC effectively provides two distinct features: a specific set of analysis modules (thermal, structural, controls, antenna radiation performance and instrument optical performance) that will function together with the IAC supporting software in an integrated and user friendly manner; and a general framework whereby new analysis modules can readily be incorporated into IAC or be allowed to communicate with it.
Planning for Crew Exercise for Deep Space Mission Scenarios
NASA Technical Reports Server (NTRS)
Moore, E. Cherice; Ryder, Jeff
2015-01-01
Exercise which is necessary for maintaining crew health on-orbit and preparing the crew for return to 1G can be challenging to incorporate into spaceflight vehicles. Deep space missions will require further understanding of the physiological response to microgravity, understanding appropriate mitigations, and designing the exercise systems to effectively provide mitigations, and integrating effectively into vehicle design with a focus to support planned mission scenarios. Recognizing and addressing the constraints and challenges can facilitate improved vehicle design and exercise system incorporation.
NASA Technical Reports Server (NTRS)
Hanley, G. M.
1981-01-01
Guidelines and ground rules followed in the development of requirements for the SPS are presented. Development planning objectives are specified in each of these areas, and evolutionary SPS program scenarios are described for the various concepts studied during the past one year contract. Program descriptions are presented as planning packages of technical tasks, and schedule phasing. Each package identifies the ground based technology effort that will facilitate SPS definitions, designs, development, and operations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Helen Kerr
2002-01-10
This report (which forms part of the requirements of the Statement of Work Task 0, subtask 0.4) records progress towards defining a detailed Work Plan for the CCP 30 days after contract initiation. It describes the studies planned, workscope development and technology provider bid evaluation status at that time. Business sensitive information is provided separately in Appendix 1. Contract negotiations are on hold pending award of patent waiver status to the CCP.
Orbiter Auxiliary Power Unit Flight Support Plan
NASA Technical Reports Server (NTRS)
Guirl, Robert; Munroe, James; Scott, Walter
1990-01-01
This paper discussed the development of an integrated Orbiter Auxiliary Power Unit (APU) and Improved APU (IAPU) Flight Suuport Plan. The plan identifies hardware requirements for continued support of flight activities for the Space Shuttle Orbiter fleet. Each Orbiter vehicle has three APUs that provide power to the hydraulic system for flight control surface actuation, engine gimbaling, landing gear deployment, braking, and steering. The APUs contain hardware that has been found over the course of development and flight history to have operating time and on-vehicle exposure time limits. These APUs will be replaced by IAPUs with enhanced operating lives on a vehicle-by-vehicle basis during scheduled Orbiter modification periods. This Flight Support Plan is used by program management, engineering, logistics, contracts, and procurement groups to establish optimum use of available hardware and replacement quantities and delivery requirements for APUs until vehicle modifications and incorporation of IAPUs. Changes to the flight manifest and program delays are evaluated relative to their impact on hardware availability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Subjects to be addressed in a Safety Integration... TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.15 Subjects to be addressed in a Safety Integration Plan...
Planning that works: Empowerment through stakeholder focused interactive planning (SFIP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beck, J.E.; Ison, S.A.
1994-12-31
This paper describes a powerful planning tool that can enable government, private industries, and public interest organizations to actualize their visions through sound decision making. The stakeholder focused interactive planning model is designed to integrate and ultimately gain stakeholder investment in the success of attainment of their vision. The only concessions required of the planning organization using this process is the acceptance of the premise that sustained vision success requires the support of both internal and external stakeholders and that each step in the process must be used as a validation of the previous step and essential to the completionmore » of the next step. What is stakeholder/public involvement? It is the process in which the stakeholders (both internal and external) values, interests and expectations are included in decision-making processes. The primary goal of public involvement efforts is to include all those who have a stake in the decision, whether or not they have already been identified. Stakeholders are individuals, contractors, clients, suppliers, public organizations, state and local governments, Indian tribes, federal agencies, and other parties affected by decisions.« less
Enterprise resource planning for hospitals.
van Merode, Godefridus G; Groothuis, Siebren; Hasman, Arie
2004-06-30
Integrated hospitals need a central planning and control system to plan patients' processes and the required capacity. Given the changes in healthcare one can ask the question what type of information systems can best support these healthcare delivery organizations. We focus in this review on the potential of enterprise resource planning (ERP) systems for healthcare delivery organizations. First ERP systems are explained. An overview is then presented of the characteristics of the planning process in hospital environments. Problems with ERP that are due to the special characteristics of healthcare are presented. The situations in which ERP can or cannot be used are discussed. It is suggested to divide hospitals in a part that is concerned only with deterministic processes and a part that is concerned with non-deterministic processes. ERP can be very useful for planning and controlling the deterministic processes.
Colleges and universities: survival in the information age
NASA Astrophysics Data System (ADS)
Huff, Warren D.
2000-07-01
Coping with information technology (IT) planning is one of the more important, expensive, time-consuming and potentially disastrous exercises an academic institution can undertake. Those institutions that are successful in establishing administrative and academic frameworks within which rapid technological change and adaptation can occur will survive and those who stubbornly adhere to archaic styles of management and decision-making will not. IT strategies, priorities and plans must be driven by and integrated with on-going academic planning. Cross-department/unit collaboration must be encouraged and facilitated by university resources and processes. Long-range planning and identification of reasonable and attainable goals requires a leadership and governance structure in which all major stakeholders participate in setting information technology strategies, priorities, plans, standards and performance measures. A successful technology funding strategy must ensure budgeting for adequate network facilities, including assets and the people and processes to support them. Accompanying these administrative procedures should be an open dialogue on the issues brought about by apparent conflicts between University wide standardization of basic policy, procedures and technologies and the pedagogical and research initiatives which address unique collegiate or departmental needs. Network capabilities should be integrated, timely, accurate, secure and easily accessible to all who need it.
Initial information prior to movement onset influences kinematics of upward arm pointing movements
Pozzo, Thierry; White, Olivier
2016-01-01
To elaborate a motor plan and perform online control in the gravity field, the brain relies on priors and multisensory integration of information. In particular, afferent and efferent inputs related to the initial state are thought to convey sensorimotor information to plan the upcoming action. Yet it is still unclear to what extent these cues impact motor planning. Here we examined the role of initial information on the planning and execution of arm movements. Participants performed upward arm movements around the shoulder at three speeds and in two arm conditions. In the first condition, the arm was outstretched horizontally and required a significant muscular command to compensate for the gravitational shoulder torque before movement onset. In contrast, in the second condition the arm was passively maintained in the same position with a cushioned support and did not require any muscle contraction before movement execution. We quantified differences in motor performance by comparing shoulder velocity profiles. Previous studies showed that asymmetric velocity profiles reflect an optimal integration of the effects of gravity on upward movements. Consistent with this, we found decreased acceleration durations in both arm conditions. However, early differences in kinematic asymmetries and EMG patterns between the two conditions signaled a change of the motor plan. This different behavior carried on through trials when the arm was at rest before movement onset and may reveal a distinct motor strategy chosen in the context of uncertainty. Altogether, we suggest that the information available online must be complemented by accurate initial information. PMID:27486106
Initial information prior to movement onset influences kinematics of upward arm pointing movements.
Rousseau, Célia; Papaxanthis, Charalambos; Gaveau, Jérémie; Pozzo, Thierry; White, Olivier
2016-10-01
To elaborate a motor plan and perform online control in the gravity field, the brain relies on priors and multisensory integration of information. In particular, afferent and efferent inputs related to the initial state are thought to convey sensorimotor information to plan the upcoming action. Yet it is still unclear to what extent these cues impact motor planning. Here we examined the role of initial information on the planning and execution of arm movements. Participants performed upward arm movements around the shoulder at three speeds and in two arm conditions. In the first condition, the arm was outstretched horizontally and required a significant muscular command to compensate for the gravitational shoulder torque before movement onset. In contrast, in the second condition the arm was passively maintained in the same position with a cushioned support and did not require any muscle contraction before movement execution. We quantified differences in motor performance by comparing shoulder velocity profiles. Previous studies showed that asymmetric velocity profiles reflect an optimal integration of the effects of gravity on upward movements. Consistent with this, we found decreased acceleration durations in both arm conditions. However, early differences in kinematic asymmetries and EMG patterns between the two conditions signaled a change of the motor plan. This different behavior carried on through trials when the arm was at rest before movement onset and may reveal a distinct motor strategy chosen in the context of uncertainty. Altogether, we suggest that the information available online must be complemented by accurate initial information. Copyright © 2016 the American Physiological Society.
Payload crew activity planning integration. Task 2: Inflight operations and training for payloads
NASA Technical Reports Server (NTRS)
Hitz, F. R.
1976-01-01
The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.
Identification and Evaluation of Integration and Cross Cutting Issues Across HRP Risks
NASA Technical Reports Server (NTRS)
Steinberg, S. L.; Shelhamer, Mark
2015-01-01
The HRP Integrated Research Plan contains the research plans for the 32 risks requiring research to characterize and mitigate. These risks to human health and performance in spaceflight are identified by evidence and each one focuses on a single aspect of human physiology or performance. They are further categorized by aspects of the spaceflight environment, such as altered gravity or space radiation, that that play a major role in their likelihood and consequence. From its inception the "integrate" in the Research Plan has denoted the integrated nature of risks to human health and performance, the connectedness of physiological systems within the human body regardless of the spaceflight environment, and the integrated response of the human body to the spaceflight environment. Common characteristics of the spaceflight environment include altered gravity, atmospheres and light/dark cycles, space radiation, isolation, noise, and periods of high or low workload. Long term exposure to this unique environment produces a suite of physiological effects such as stress; vision, neurocognitive and anthropometric changes; circadian misalignment; fluid shifts, deconditioning; immune dysregulation; and altered nutritional requirements. Matrix diagraming was used to systematically identify, analyze and rate the many-to-many relationships between environmental characteristics and the suite of physiological effects. It was also to identify patterns in the relationships of common physiological effects to each other. Analyses of patterns or relationships in these diagrams help to identify issues that cut across multiple risks. Cross cutting issues benefit from a multidisciplinary approach that synthesizes concepts or data from two or more disciplines to identify and characterize risk factors or develop countermeasures relevant to multiple risks. They also help to illuminate possible problem areas that may arise when a countermeasure impacts risks other than those which it was developed to mitigate, or identify groupings of physiological changes that are likely to occur that may impact the overall risk posture.
NASA GRC UAS Project: Communications Modeling and Simulation Status
NASA Technical Reports Server (NTRS)
Kubat, Greg
2013-01-01
The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and/or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC team, will provide a view of the overall planned simulation effort and objectives, a description of the simulation concept and status of the design and development that has occurred to date.
49 CFR 244.11 - Contents of a Safety Integration Plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...
49 CFR 244.11 - Contents of a Safety Integration Plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...
49 CFR 244.11 - Contents of a Safety Integration Plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...
49 CFR 244.11 - Contents of a Safety Integration Plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...
49 CFR 244.11 - Contents of a Safety Integration Plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Contents of a Safety Integration Plan. 244.11... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL Safety Integration Plans § 244.11 Contents of a Safety...
Plan-provider integration, premiums, and quality in the Medicare Advantage market.
Frakt, Austin B; Pizer, Steven D; Feldman, Roger
2013-12-01
To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.
USDA-ARS?s Scientific Manuscript database
According to the U.S. National Environmental Policy Act of 1969 (NEPA), federal action to manipulate habitat for species conservation requires an environmental impact statement (EIS), which should integrate natural and social sciences in planning and decision-making. Nonetheless, most impact assessm...
48 CFR 836.606-73 - Application of 6 percent architect-engineer fee limitation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (vi) Surveys: topographic, boundary, utilities, etc. (2) Special consultant services that are not... required. (3) Other: (i) Reproduction of approved designs through models, color renderings, photographs, or...) All other services that are not an integral part of the production and delivery of plans, designs, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-18
..., education, enforcement, and emergency medical service stakeholders. The SHSP process allows highway safety... INFORMATION CONTACT: Jeffrey Miller, (202) 366-0744 or [email protected] , Office of Safety Integration... Highway Safety Plan (SHSP). Type of request: New information collection requirement. Background: The Safe...
26 CFR 1.401(l)-0 - Table of contents.
Code of Federal Regulations, 2014 CFR
2014-04-01
.... (5) Prorated integration level for short plan year. (e) Examples. § 1.401(l)-3Permitted disparity for... forms. (D) Post-retirement cost-of-living adjustments. (1) In general. (2) Requirements. (E) Section 417(e) exception. (5) Examples. (c) Uniform disparity. (1) In general. (2) Deemed uniformity. (i) In...
26 CFR 1.401(l)-0 - Table of contents.
Code of Federal Regulations, 2010 CFR
2010-04-01
.... (5) Prorated integration level for short plan year. (e) Examples. § 1.401(l)-3Permitted disparity for... forms. (D) Post-retirement cost-of-living adjustments. (1) In general. (2) Requirements. (E) Section 417(e) exception. (5) Examples. (c) Uniform disparity. (1) In general. (2) Deemed uniformity. (i) In...
26 CFR 1.401(l)-0 - Table of contents.
Code of Federal Regulations, 2013 CFR
2013-04-01
.... (5) Prorated integration level for short plan year. (e) Examples. § 1.401(l)-3Permitted disparity for... forms. (D) Post-retirement cost-of-living adjustments. (1) In general. (2) Requirements. (E) Section 417(e) exception. (5) Examples. (c) Uniform disparity. (1) In general. (2) Deemed uniformity. (i) In...
Evidence of Cultural Competence within Teacher Performance Assessments
ERIC Educational Resources Information Center
Dee, Amy Lynn
2012-01-01
Professional integrity and changing demographics in the public school system in the United States coupled with standards for teacher preparation require that preservice teachers possess knowledge, skills, and dispositions necessary to work with diverse populations. Using the Teacher Work Sample, a plan for instruction serving as a teacher…
Examples of Disposition Alternatives for WTP Solid Secondary Waste
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seitz, R.
The Hanford Waste Treatment and Immobilization Plant is planned to produce a variety of solid secondary wastes that will require disposal at the Integrated Disposal Facility on the Hanford Site. Solid secondary wastes include a variety of waste streams that are a result of waste treatment and processing activities.
Misleading prioritizations from modelling range shifts under climate change
Helen R. Sofaer; Catherine S. Jarnevich; Curtis H. Flather
2018-01-01
Conservation planning requires the prioritization of a subset of taxa and geographical locations to focus monitoring and management efforts. Integration of the threats and opportunities posed by climate change often relies on predictions from species distribution models, particularly for assessments of vulnerability or invasion risk for multiple taxa. We evaluated...
78 FR 18967 - Meeting of the Secretary of the Navy Advisory Panel
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... DEPARTMENT OF DEFENSE Department of the Navy Meeting of the Secretary of the Navy Advisory Panel... Under Secretary of the Navy (Plans, Policy, Oversight & Integration), 1000 Navy Pentagon, Washington, DC..., the Secretary of the Navy has determined in writing that the public interest requires that all...
Integrated Strategic Planning and Analysis Network Increment 5 (ISPAN Inc 5)
2016-03-01
Defense Acquisition Executive DoD - Department of Defense DoDAF - DoD Architecture Framework FD - Full Deployment FDD - Full Deployment Decision...achieve FDD in August 2018. ISPAN Inc 5 is envisioned as a follow-on to ISPAN Inc 4 in order to respond to USSTRATCOM requirements for improved
ERIC Educational Resources Information Center
McLeod, Poppy Lauretta; Cotter, James F.
1999-01-01
In a joint exercise between required finance and organizational behavior courses, graduate students applied material for both classes to a single case study on acquisition and merger. Students conducted financial analyses, role played negotiations, and created an implementation plan. (SK)
ERIC Educational Resources Information Center
Oskoz, Ana; Elola, Idoia
2016-01-01
This article provides an overview of how digital stories (DSs)--storylines that integrate text, images, and sound--have been used in second-language (L2) contexts. The article first reviews the methodical and planned, albeit non-linear, steps required for successful implementation of DSs in the L2 classroom and then assesses the observed…
49 CFR 192.1007 - What are the required elements of an integrity management plan?
Code of Federal Regulations, 2010 CFR
2010-10-01
... (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Gas... threats and risks to its gas distribution pipeline. (2) Consider the information gained from past design...
Integrating Workforce Practices into the English Classroom.
ERIC Educational Resources Information Center
Mayes, Donna
1999-01-01
Asserts that effectively preparing students for the challenges of an ever-changing workplace requires incorporating the use of technology and the principles of business management into the classroom environment. Summarizes the development of a formal team research project for an English course that teaches skills that include planning and…
NASA Technical Reports Server (NTRS)
1978-01-01
The verification process and requirements for the ascent guidance interfaces and the ascent integrated guidance, navigation and control system for the space shuttle orbiter are defined as well as portions of supporting systems which directly interface with the system. The ascent phase of verification covers the normal and ATO ascent through the final OMS-2 circularization burn (all of OPS-1), the AOA ascent through the OMS-1 burn, and the RTLS ascent through ET separation (all of MM 601). In addition, OPS translation verification is defined. Verification trees and roadmaps are given.
A Generalized Decision Framework Using Multi-objective Optimization for Water Resources Planning
NASA Astrophysics Data System (ADS)
Basdekas, L.; Stewart, N.; Triana, E.
2013-12-01
Colorado Springs Utilities (CSU) is currently engaged in an Integrated Water Resource Plan (IWRP) to address the complex planning scenarios, across multiple time scales, currently faced by CSU. The modeling framework developed for the IWRP uses a flexible data-centered Decision Support System (DSS) with a MODSIM-based modeling system to represent the operation of the current CSU raw water system coupled with a state-of-the-art multi-objective optimization algorithm. Three basic components are required for the framework, which can be implemented for planning horizons ranging from seasonal to interdecadal. First, a water resources system model is required that is capable of reasonable system simulation to resolve performance metrics at the appropriate temporal and spatial scales of interest. The system model should be an existing simulation model, or one developed during the planning process with stakeholders, so that 'buy-in' has already been achieved. Second, a hydrologic scenario tool(s) capable of generating a range of plausible inflows for the planning period of interest is required. This may include paleo informed or climate change informed sequences. Third, a multi-objective optimization model that can be wrapped around the system simulation model is required. The new generation of multi-objective optimization models do not require parameterization which greatly reduces problem complexity. Bridging the gap between research and practice will be evident as we use a case study from CSU's planning process to demonstrate this framework with specific competing water management objectives. Careful formulation of objective functions, choice of decision variables, and system constraints will be discussed. Rather than treating results as theoretically Pareto optimal in a planning process, we use the powerful multi-objective optimization models as tools to more efficiently and effectively move out of the inferior decision space. The use of this framework will help CSU evaluate tradeoffs in a continually changing world.
Integrating financial and strategic planning.
Pivnicny, V C
1989-09-01
As hospitals face mounting profitability and liquidity concerns, the need to integrate strategic and financial planning also will continue to grow. This article describes a process for integrating these planning functions and the ideal organizational framework to facilitate the process. Obstacles to the integration of these planning processes also are discussed.
49 CFR 1106.4 - The Safety Integration Plan process.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 8 2011-10-01 2011-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...
49 CFR 1106.4 - The Safety Integration Plan process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 8 2013-10-01 2013-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...
49 CFR 1106.4 - The Safety Integration Plan process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 8 2014-10-01 2014-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...
49 CFR 1106.4 - The Safety Integration Plan process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 8 2012-10-01 2012-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...
49 CFR 1106.4 - The Safety Integration Plan process.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS OF CONTROL § 1106.4 The Safety Integration Plan process. (a) Each applicant in a transaction subject...
Workshop Proceedings: Sensor Systems for Space Astrophysics in the 21st Century, Volume 2
NASA Technical Reports Server (NTRS)
Wilson, Barbara A. (Editor)
1991-01-01
In 1989, the Astrophysics Division of the Office of Space Science and Applications initiated the planning of a technology development program, Astrotech 21, to develop the technological base for the Astrophysics missions developed in the period 1995 to 2015. The Sensor Systems for Space Astrophysics in the 21st Century Workshop was one of three Integrated Technology Planning workshops. Its objectives were to develop an understanding of the future comprehensive development program to achieve the required capabilities. Program plans and recommendations were prepared in four areas: x ray and gamma ray sensors, ultraviolet and visible sensors, direct infrared sensors, and heterodyne submillimeter wave sensors.
A Strategic Plan for Integrating ICD-10 in Your Practice and Workflow.
Bowman, Sue; Cleland, Risë Marie; Staggs, Stuart
2015-01-01
The adoption of the International Classification of Disease (ICD) 10th Revision (ICD-10) diagnosis code set in the United States has been legislatively delayed several times with the most recent date for implementation set for October 1, 2015. The transition from ICD-9 to ICD-10 will be a major undertaking that will require a substantial amount of planning. In the following article, we outline the steps to develop and implement a strategic plan for the transition to the new code set, identify training needs throughout the practice, and review the challenges and opportunities associated with the transition to ICD-10.
A planning and scheduling lexicon
NASA Technical Reports Server (NTRS)
Cruz, Jennifer W.; Eggemeyer, William C.
1989-01-01
A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.
The organization and delivery of family planning services in community health centers.
Goldberg, Debora Goetz; Wood, Susan F; Johnson, Kay; Mead, Katherine Holly; Beeson, Tishra; Lewis, Julie; Rosenbaum, Sara
2015-01-01
Family planning and related reproductive health services are essential primary care services for women. Access is limited for women with low incomes and those living in medically underserved areas. Little information is available on how federally funded health centers organize and provide family planning services. This was a mixed methods study of the organization and delivery of family planning services in federally funded health centers across the United States. A national survey was developed and administered (n = 423) and in-depth case studies were conducted of nine health centers to obtain detailed information on their approach to family planning. Study findings indicate that health centers utilize a variety of organizational models and staffing arrangements to deliver family planning services. Health centers' family planning offerings are organized in one of two ways, either a separate service with specific providers and clinic times or fully integrated with primary care. Health centers experience difficulties in providing a full range of family planning services. Major challenges include funding limitations; hiring obstetricians/gynecologists, counselors, and advanced practice clinicians; and connecting patients to specialized services not offered by the health center. Health centers play an integral role in delivering primary care and family planning services to women in medically underserved communities. Improving the accessibility and comprehensiveness of family planning services will require a combination of additional direct funding, technical assistance, and policies that emphasize how health centers can incorporate quality family planning as a fundamental element of primary care. Copyright © 2015 Jacobs Institute of Women's Health. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Moore, Kevin D.
2017-01-01
Trying to get your experiment aboard ISS? You likely will need power. Many enditem providers do. ISS Plug-In Plan (IPiP) supports power and data for science, Payloads (or Utilization), vehicle systems, and daily operations through the Electrical Power System (EPS) Secondary Power/Data Subsystem. Yet limited resources and increasing requirements continue to influence decisions on deployment of ISS end items. Given the fluid launch schedule and the rapidly- increasing number of end item providers requiring power support, the focus of the Plug-In Plan has evolved from a simple FIFO recommendation to provide power to end item users, to anticipating future requirements by judicious development and delivery of support equipment (cables, power supplies, power strips, and alternating current (AC) power inverters), employing innovative deployment strategies, and collaborating on end item development. This paper describes the evolution of the ISS Program Office, Engineering Directorate, Flight Operations Directorate (FOD), International Partners and the end item provider relationship and how collaboration successfully leverages unique requirements with limited on- board equipment and resources, tools and processes which result in more agile integration, and describes the process designed for the new ISS end item provider to assure that their power requirements will be met.
INFOMAR - Ireland's National Seabed Mapping Programme: A Tool For Marine Spatial Planning
NASA Astrophysics Data System (ADS)
Furey, T. M.
2016-02-01
INFOMAR is Ireland's national seabed mapping programme and is a key action in the national integrated marine plan, Harnessing Our Ocean Wealth. It comprises a multi-platform approach to delivering marine integrated mapping in 2 phases, over a projected 20 year timeline (2006-2026). The programme has three work strands; Data Acquisition, Data Exchange and Integration, and Value Added Exploitation. The Data Acquisition strand includes collection of hydrographic, oceanographic, geological, habitat and heritage datasets that will underpin future sustainable development and management of Ireland's marine resource. INFOMAR outputs are delivered through the Data Exchange and Integration strand. Uses of these outputs are wide ranging and multipurpose, from management plans for fisheries, aquaculture and coastal protection works, to environmental impact assessments, ocean renewable development and integrated coastal zone management. In order to address the evolution and diversification of maritime user requirements, the programme has realigned and developed outputs and new products, in part, through an innovative research funding initiative. Development is also fostered through the Value Added Exploitation strand. INFOMAR outputs and products serve to underpin delivery of Ireland's statutory obligations and enhance compliance with EU and national legislation. This is achieved through co-operation with the agencies responsible for supporting Ireland's international obligations and for the implementation of marine spatial planning. A strategic national seabed mapping programme such as INFOMAR, provides a critical baseline dataset which underpins development of the marine economy, and improves our understanding of the response of marine systems to pressures, and the effect of cumulative impacts. This paper will focus on the evolution and scope of INFOMAR, and look at examples of outputs being harnessed to serve approaches to the management of activities having an impact on the marine environment.
NASA Technical Reports Server (NTRS)
Thompson, W. S.; Ruedger, W. H.
1973-01-01
A review of user requirements and updated instrumentation plans are presented for the aircraft tracking and guidance facility at NASA Wallops Station. User demand has increased as a result of new flight research programs; however, basic requirements remain the same as originally reported. Instrumentation plans remain essentially the same but with plans for up- and down-link telemetry more firm. With slippages in the laser acquisition schedule, added importance is placed on the FPS-16 radar as the primary tracking device until the laser is available. Limited simulation studies of a particular Kalman-type filter are also presented. These studies simulated the use of the filter in a helicopter guidance loop in a real-time mode. Disadvantages and limitations of this mode of operation are pointed out. Laser eyesafety calculations show that laser tracking of aircraft is readily feasible from the eyesafety viewpoint.
National space transportation systems planning
NASA Technical Reports Server (NTRS)
Lucas, W. R.
1985-01-01
In the fall of 1984, the DOD and NASA had been asked to identify launch vehicle technologies which could be made available for use in 1995 to 2010. The results of the studies of the two groups were integrated, and a consumer report, dated December 1984, was forwarded to the President. Aspects of mission planning and analysis are discussed along with a combined mission model, future launch system requirements, a launch vehicle planning background, Shuttle derivative vehicle program options, payload modularization, launch vehicle technology implications, a new engine program for the mid-1990's. Future launch systems goals are to achieve an order of magnitude reduction in future launch cost and meet the lift requirements and launch rates. Attention is given to an advanced cryogenic engine, advanced LOX/hydrocarbon engine, advanced power systems, aerodynamics/flight mechanics, reentry/recovery systems, avionics/software, advanced manufacturing techniques, autonomous ground and mission operations, advanced structures/materials, and air breathing propulsion.
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
The MSFC Systems Engineering Guide: An Overview and Plan
NASA Technical Reports Server (NTRS)
Shelby, Jerry A.; Thomas, L. Dale
2007-01-01
As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.
MANPRINT Methods Monograph: Aiding the Development of Manned System Performance Criteria
1989-06-01
the need for the new system. It may be necessary co derive these requirements from combat models. By modeling the capabilities of the current force ...FORMAT The O&O Plan describes how a system will be integrated into the force structure, deployed, operated, and supported in peacetime and wartime...for evaluation during OT I. 9. MANPOWER/ FORCE STRUCTURE ASSESSMENT. Estimate manpower require- ments per system, using unit, and total Army by
International Space Station Increment Operations Services
NASA Astrophysics Data System (ADS)
Michaelis, Horst; Sielaff, Christian
2002-01-01
The Industrial Operator (IO) has defined End-to-End services to perform efficiently all required operations tasks for the Manned Space Program (MSP) as agreed during the Ministerial Council in Edinburgh in November 2001. Those services are the result of a detailed task analysis based on the operations processes as derived from the Space Station Program Implementation Plans (SPIP) and defined in the Operations Processes Documents (OPD). These services are related to ISS Increment Operations and ATV Mission Operations. Each of these End-to-End services is typically characterised by the following properties: It has a clearly defined starting point, where all requirements on the end-product are fixed and associated performance metrics of the customer are well defined. It has a clearly defined ending point, when the product or service is delivered to the customer and accepted by him, according to the performance metrics defined at the start point. The implementation of the process might be restricted by external boundary conditions and constraints mutually agreed with the customer. As far as those are respected the IO has the free choice to select methods and means of implementation. The ISS Increment Operations Service (IOS) activities required for the MSP Exploitation program cover the complete increment specific cycle starting with the support to strategic planning and ending with the post increment evaluation. These activities are divided into sub-services including the following tasks: - ISS Planning Support covering the support to strategic and tactical planning up to the generation - Development &Payload Integration Support - ISS Increment Preparation - ISS Increment Execution These processes are tight together by the Increment Integration Management, which provides the planning and scheduling of all activities as well as the technical management of the overall process . The paper describes the entire End-to-End ISS Increment Operations service and the implementation to support the Columbus Flight 1E related increment and subsequent ISS increments. Special attention is paid to the implications caused by long term operations on hardware, software and operations personnel.
NASA Technical Reports Server (NTRS)
1979-01-01
Excerpts from federal legislation and regulations mandating areawide waster treatment management as a means of restoring and maintaining the integrity of the nation's water are presented along with requirements for grants to the states for water quality planning, management, and implementation. Experiences using LANDSAT to identify nonpoint sources of water pollution as well as land/use/land cover features in South Dakota, Kentucky, Georgia, New Jersey, and Texas are described. Present activities suggest that this type of remote sensing is an efficient, effective tool for areawide water quality planning. Interaction with cognizant federal, state, and local government personnel involved in EPA section 208 planning activities can guide the development of new capabilities and enhance their utility and prospect for use.
Surface-water quality-assurance plan for the U.S. Geological Survey Washington Water Science Center
Mastin, Mark C.
2016-02-19
This Surface-Water Quality-Assurance Plan documents the standards, policies, and procedures used by the U.S. Geological Survey Washington Water Science Center (WAWSC) for activities related to the collection, processing, storage, analysis, and publication of surface-water data. This plan serves as a guide to all WAWSC personnel involved in surface-water data activities, and changes as the needs and requirements of the WAWSC change. Regular updates to this plan represent an integral part of the quality-assurance process. In the WAWSC, direct oversight and responsibility by the hydrographer(s) assigned to a surface-water station, combined with team approaches in all work efforts, assure highquality data, analyses, reviews, and reports for cooperating agencies and the public.
Luo, He; Liang, Zhengzheng; Zhu, Moning; Hu, Xiaoxuan; Wang, Guoqiang
2018-01-01
Wind has a significant effect on the control of fixed-wing unmanned aerial vehicles (UAVs), resulting in changes in their ground speed and direction, which has an important influence on the results of integrated optimization of UAV task allocation and path planning. The objective of this integrated optimization problem changes from minimizing flight distance to minimizing flight time. In this study, the Euclidean distance between any two targets is expanded to the Dubins path length, considering the minimum turning radius of fixed-wing UAVs. According to the vector relationship between wind speed, UAV airspeed, and UAV ground speed, a method is proposed to calculate the flight time of UAV between targets. On this basis, a variable-speed Dubins path vehicle routing problem (VS-DP-VRP) model is established with the purpose of minimizing the time required for UAVs to visit all the targets and return to the starting point. By designing a crossover operator and mutation operator, the genetic algorithm is used to solve the model, the results of which show that an effective UAV task allocation and path planning solution under steady wind can be provided.
Liang, Zhengzheng; Zhu, Moning; Hu, Xiaoxuan; Wang, Guoqiang
2018-01-01
Wind has a significant effect on the control of fixed-wing unmanned aerial vehicles (UAVs), resulting in changes in their ground speed and direction, which has an important influence on the results of integrated optimization of UAV task allocation and path planning. The objective of this integrated optimization problem changes from minimizing flight distance to minimizing flight time. In this study, the Euclidean distance between any two targets is expanded to the Dubins path length, considering the minimum turning radius of fixed-wing UAVs. According to the vector relationship between wind speed, UAV airspeed, and UAV ground speed, a method is proposed to calculate the flight time of UAV between targets. On this basis, a variable-speed Dubins path vehicle routing problem (VS-DP-VRP) model is established with the purpose of minimizing the time required for UAVs to visit all the targets and return to the starting point. By designing a crossover operator and mutation operator, the genetic algorithm is used to solve the model, the results of which show that an effective UAV task allocation and path planning solution under steady wind can be provided. PMID:29561888
Evaluating landscape health: Integrating societal goals and biophysical process
Rapport, D.J.; Gaudet, C.; Karr, J.R.; Baron, Jill S.; Bohlen, C.; Jackson, W.; Jones, Bruce; Naiman, R.J.; Norton, B.; Pollock, M. M.
1998-01-01
Evaluating landscape change requires the integration of the social and natural sciences. The social sciences contribute to articulating societal values that govern landscape change, while the natural sciences contribute to understanding the biophysical processes that are influenced by human activity and result in ecological change. Building upon Aldo Leopold's criteria for landscape health, the roles of societal values and biophysical processes in shaping the landscape are explored. A framework is developed for indicators of landscape health and integrity. Indicators of integrity are useful in measuring biological condition relative to the condition in landscapes largely unaffected by human activity, while indicators of health are useful in evaluating changes in highly modified landscapes. Integrating societal goals and biophysical processes requires identification of ecological services to be sustained within a given landscape. It also requires the proper choice of temporal and spatial scales. Societal values are based upon inter-generational concerns at regional scales (e.g. soil and ground water quality). Assessing the health and integrity of the environment at the landscape scale over a period of decades best integrates societal values with underlying biophysical processes. These principles are illustrated in two contrasting case studies: (1) the South Platte River study demonstrates the role of complex biophysical processes acting at a distance; and (2) the Kissimmee River study illustrates the critical importance of social, cultural and economic concerns in the design of remedial action plans. In both studies, however, interactions between the social and the biophysical governed the landscape outcomes. The legacy of evolution and the legacy of culture requires integration for the purpose of effectively coping with environmental change.
Mission Success for Combustion Science
NASA Technical Reports Server (NTRS)
Weiland, Karen J.
2004-01-01
This presentation describes how mission success for combustion experiments has been obtained in previous spaceflight experiments and how it will be obtained for future International Space Station (ISS) experiments. The fluids and combustion facility is a payload planned for the ISS. It is composed of two racks: the fluids Integrated rack and the Combustion INtegrated Rack (CIR). Requirements for the CIR were obtained from a set of combustion basis experiments that served as surrogates for later experiments. The process for experiments that fly on the ISS includes proposal selection, requirements and success criteria definition, science and engineering reviews, mission operations, and postflight operations. By following this process, the microgravity combustion science program has attained success in 41 out of 42 experiments.
Intelligent Elements for the ISHM Testbed and Prototypes (ITP) Project
NASA Technical Reports Server (NTRS)
Maul, William A.; Park, Han; Schwabacher, Mark; Watson, Michael; Mackey, Ryan; Fijany, Amir; Trevino, Luis; Weir, John
2005-01-01
Deep-space manned missions will require advanced automated health assessment capabilities. Requirements such as in-space assembly, long dormant periods and limited accessibility during flight, present significant challenges that should be addressed through Integrated System Health Management (ISHM). The ISHM approach will provide safety and reliability coverage for a complete system over its entire life cycle by determining and integrating health status and performance information from the subsystem and component levels. This paper will focus on the potential advanced diagnostic elements that will provide intelligent assessment of the subsystem health and the planned implementation of these elements in the ISHM Testbed and Prototypes (ITP) Project under the NASA Exploration Systems Research and Technology program.
26 CFR 1.401(l)-4 - Special rules for railroad plans.
Code of Federal Regulations, 2010 CFR
2010-04-01
... paragraph (b)(2) or (b)(3) of this section for the plan year. (2) Single integration level method—(i) In general. A plan satisfies this paragraph (b)(2) if— (A) The plan specifies a single integration level for... percentage of such plan year compensation). (3) Two integration level method—(i) In general. A plan satisfies...
NASA Technical Reports Server (NTRS)
Dittmer, Laura N.; Drews, Michael E.; Lineaweaver, Sean K.; Shipley, Derek E.; Hoehn, A.
1991-01-01
Previous design efforts of a cost effective and reliable regenerative life support system (RLSS) provided the foundation for the characterization of organisms or 'biological processors' in engineering terms and a methodology was developed for their integration into an engineered ecological LSS in order to minimize the mass flow imbalances between consumers and producers. These techniques for the design and the evaluation of bioregenerative LSS have now been integrated into a lunar base reference mission, emphasizing the phased implementation of components of such a BLSS. In parallel, a designers handbook was compiled from knowledge and experience gained during past design projects to aid in the design and planning of future space missions requiring advanced RLSS technologies. The lunar base reference mission addresses in particular the phased implementation and integration of BLS parts and includes the resulting infrastructure burdens and needs such as mass, power, volume, and structural requirements of the LSS. Also, operational aspects such as manpower requirements and the possible need and application of 'robotics' were addressed.
Applications of Payload Directed Flight
NASA Technical Reports Server (NTRS)
Ippolito, Corey; Fladeland, Matthew M.; Yeh, Yoo Hsiu
2009-01-01
Next generation aviation flight control concepts require autonomous and intelligent control system architectures that close control loops directly around payload sensors in manner more integrated and cohesive that in traditional autopilot designs. Research into payload directed flight control at NASA Ames Research Center is investigating new and novel architectures that can satisfy the requirements for next generation control and automation concepts for aviation. Tighter integration between sensor and machine requires definition of specific sensor-directed control modes to tie the sensor data directly into a vehicle control structures throughout the entire control architecture, from low-level stability- and control loops, to higher level mission planning and scheduling reasoning systems. Payload directed flight systems can thus provide guidance, navigation, and control for vehicle platforms hosting a suite of onboard payload sensors. This paper outlines related research into the field of payload directed flight; and outlines requirements and operating concepts for payload directed flight systems based on identified needs from the scientific literature.'
NASA Technical Reports Server (NTRS)
Zell, P. T.; Hoffmann, J.; Sandlin, D. R.
1985-01-01
A study was performed in order to develop the criteria for the selection of flow direction indicators for use in the Integrated Systems Tests (ISTs) of the 40 by 80/80 by 120 Foot Wind Tunnel System. The problems, requirements, and limitations of flow direction measurement in the wind tunnel were investigated. The locations and types of flow direction measurements planned in the facility were discussed. A review of current methods of flow direction measurement was made and the most suitable technique for each location was chosen. A flow direction vane for each location was chosen. A flow direction vane that employs a Hall Effect Transducer was then developed and evaluated for application during the ISTs.
Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support
NASA Technical Reports Server (NTRS)
Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun
2012-01-01
This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.
Design of an Electronic Reminder System for Supporting the Integerity of Nursing Records.
Chen, Chien-Min; Hou, I-Ching; Chen, Hsiao-Ping; Weng, Yung-Ching
2016-01-01
The integrity of electronic nursing records (ENRs) stands for the quality of medical records. But patients' conditions are varied (e.g. not every patient had wound or need fall prevention), to achieve the integrity of ENRs depends much on clinical nurses' attention. Our study site, an one 2,300-bed hospital in northern Taiwan, there are a total of 20 ENRs including nursing assessments, nursing care plan, discharge planning etc. implemented in the whole hospital before 2014. It become important to help clinical nurses to decrease their human recall burden to complete these records. Thus, the purpose of this study was to design an ENRs reminder system (NRS) to facilitate nursing recording process. The research team consisted of an ENR engineer, a clinical head nurse and a nursing informatics specialist began to investigate NRS through three phases (e.g. information requirements; design and implementation). In early 2014, a qualitative research method was used to identify NRS information requirements through both groups (e.g. clinical nurses and their head nurses) focus interviews. According to the their requirements, one prototype was created by the nursing informatics specialist. Then the engineer used Microsoft Visual Studio 2012, C#, and Oracle to designed a web-based NRS (Figure 1). Then the integrity reminder system which including a total of twelve electronic nursing records was designed and the preliminary accuracy validation of the system was 100%. NRS could be used to support nursing recording process and prepared for implementing in the following phase.
Strategies for automatic planning: A collection of ideas
NASA Technical Reports Server (NTRS)
Collins, Carol; George, Julia; Zamani, Elaine
1989-01-01
The main goal of the Jet Propulsion Laboratory (JPL) is to obtain science return from interplanetary probes. The uplink process is concerned with communicating commands to a spacecraft in order to achieve science objectives. There are two main parts to the development of the command file which is sent to a spacecraft. First, the activity planning process integrates the science requests for utilization of spacecraft time into a feasible sequence. Then the command generation process converts the sequence into a set of commands. The development of a feasible sequence plan is an expensive and labor intensive process requiring many months of effort. In order to save time and manpower in the uplink process, automation of parts of this process is desired. There is an ongoing effort to develop automatic planning systems. This has met with some success, but has also been informative about the nature of this effort. It is now clear that innovative techniques and state-of-the-art technology will be required in order to produce a system which can provide automatic sequence planning. As part of this effort to develop automatic planning systems, a survey of the literature, looking for known techniques which may be applicable to our work was conducted. Descriptions of and references for these methods are given, together with ideas for applying the techniques to automatic planning.
Developing integrated parametric planning models for budgeting and managing complex projects
NASA Technical Reports Server (NTRS)
Etnyre, Vance A.; Black, Ken U.
1988-01-01
The applicability of integrated parametric models for the budgeting and management of complex projects is investigated. Methods for building a very flexible, interactive prototype for a project planning system, and software resources available for this purpose, are discussed and evaluated. The prototype is required to be sensitive to changing objectives, changing target dates, changing costs relationships, and changing budget constraints. To achieve the integration of costs and project and task durations, parametric cost functions are defined by a process of trapezoidal segmentation, where the total cost for the project is the sum of the various project cost segments, and each project cost segment is the integral of a linearly segmented cost loading function over a specific interval. The cost can thus be expressed algebraically. The prototype was designed using Lotus-123 as the primary software tool. This prototype implements a methodology for interactive project scheduling that provides a model of a system that meets most of the goals for the first phase of the study and some of the goals for the second phase.
Refsgaard, A; Jacobsen, T; Jacobsen, B; Ørum, J-E
2007-01-01
The EU Water Framework Directive (WFD) requires an integrated approach to river basin management in order to meet environmental and ecological objectives. This paper presents concepts and full-scale application of an integrated modelling framework. The Ringkoebing Fjord basin is characterized by intensive agricultural production and leakage of nitrate constitute a major pollution problem with respect groundwater aquifers (drinking water), fresh surface water systems (water quality of lakes) and coastal receiving waters (eutrophication). The case study presented illustrates an advanced modelling approach applied in river basin management. Point sources (e.g. sewage treatment plant discharges) and distributed diffuse sources (nitrate leakage) are included to provide a modelling tool capable of simulating pollution transport from source to recipient to analyse the effects of specific, localized basin water management plans. The paper also includes a land rent modelling approach which can be used to choose the most cost-effective measures and the location of these measures. As a forerunner to the use of basin-scale models in WFD basin water management plans this project demonstrates the potential and limitations of comprehensive, integrated modelling tools.
Planner-Based Control of Advanced Life Support Systems
NASA Technical Reports Server (NTRS)
Muscettola, Nicola; Kortenkamp, David; Fry, Chuck; Bell, Scott
2005-01-01
The paper describes an approach to the integration of qualitative and quantitative modeling techniques for advanced life support (ALS) systems. Developing reliable control strategies that scale up to fully integrated life support systems requires augmenting quantitative models and control algorithms with the abstractions provided by qualitative, symbolic models and their associated high-level control strategies. This will allow for effective management of the combinatorics due to the integration of a large number of ALS subsystems. By focusing control actions at different levels of detail and reactivity we can use faster: simpler responses at the lowest level and predictive but complex responses at the higher levels of abstraction. In particular, methods from model-based planning and scheduling can provide effective resource management over long time periods. We describe reference implementation of an advanced control system using the IDEA control architecture developed at NASA Ames Research Center. IDEA uses planning/scheduling as the sole reasoning method for predictive and reactive closed loop control. We describe preliminary experiments in planner-based control of ALS carried out on an integrated ALS simulation developed at NASA Johnson Space Center.
Integrated Global Observation Strategy - Ozone and Atmospheric Chemistry Project
NASA Technical Reports Server (NTRS)
Hilsenrath, Ernest; Readings, C. J.; Kaye, J.; Mohnen, V.; Einaudi, Franco (Technical Monitor)
2000-01-01
The "Long Term Continuity of Stratospheric Ozone Measurements and Atmospheric Chemistry" project was one of six established by the Committee on Earth Observing Satellites (CEOS) in response to the Integrated Global Observing Strategy (IGOS) initiative. IGOS links satellite and ground based systems for global environmental observations. The strategy of this project is to develop a consensus of user requirements including the scientific (SPARC, IGAC, WCRP) and the applications community (WMO, UNEP) and to develop a long-term international plan for ozone and atmospheric chemistry measurements. The major components of the observing system include operational and research (meeting certain criteria) satellite platforms planned by the space faring nations which are integrated with a well supported and sustained ground, aircraft, and balloon measurements program for directed observations as well satellite validation. Highly integrated and continuous measurements of ozone, validation, and reanalysis efforts are essential to meet the international scientific and applications goals. In order to understand ozone trends, climate change, and air quality, it is essential to conduct long term measurements of certain other atmospheric species. These species include key source, radical, and reservoir constituents.
An Assessment of Institutional Capacity for Integrated Landscape Management in Eastern Cameroon.
Brown, H Carolyn Peach
2018-07-01
Landscape approaches have become prominent in efforts to address issues of conservation and development through bringing together different actors and sectors, to reconcile diverse land uses, and promote synergies. Some have suggested that integrated landscape management approaches are consistent with the goals of REDD+ and offer a strategy to address multiple goals of climate change mitigation, biodiversity conservation, maintenance of ecosystem services, and socio-economic development. Institutional or governance arrangements have been shown to be a critical component in influencing outcomes in landscapes. Using diverse methodologies, this study investigated the capacity of institutions to support the planning, implementation, and resource mobilization needed to integrate climate change mitigation, conservation, and livelihood goals in a forest mosaic landscape in East Cameroon. Results showed that diverse institutions are present in the landscape, including institutions of relevant government agencies, local government, local non-government, the private sector, and hybrid institutions of conservation, development and research institutions. However, the overall institutional capacity for integrated landscape planning and management in the study area is limited, although some institutions exhibit increased capacity in some areas over others. Multiple strategies can be employed to build the necessary human, financial, and leadership capacity, and facilitate the institutional planning and coordination that is foundational to multi-stakeholder landscape governance. Given the complexity of integrating climate change mitigation, conservation and livelihood goals in a landscape, building such institutional capacity is a long term endeavour that requires sustained effort and ongoing financial, technical and human resource support.
Integration and baseline management training and transition plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jech, J.B.
The purpose of the Integration and Baseline Management Training and Transition Plan is to provide a training outline for the Integration and Baseline Management (I and BM) organization and a transition strategy for the Master Equipment List (MEL) Phase 1 application. The training outline includes the following courses: MEL Phase 1 Application Course 1 Master Equipment List General Overview. Course 2 Master Equipment List Editing. Tank Waste Remediation System (TWRS) Labeling Related Course 3 TWRS Equipment Labeling Program (Course Number 350545). As part of courses 1, 2, and 3, it is recommended that a lesson plan be developed and integratedmore » into each of the three courses on the subject of Configuration Management (CM) to include: CM concepts, terminology, definitions, fundamentals and its application with respect to the course. The strategy for the MEL Phase 1 application is to train internal organizations (I and BM) on the MEL-General Overview for read only users and train MEL-Editing for edit users (only on an as needed basis). For external organizations, the strategy is to train selected personnel on the MEL-General Overview and transition them from read only privileges to editing privileges when the appropriate administrative procedures that outline the external organization`s responsibilities (to support MEL) are established. The purpose of this training is to ensure support of the I and BM organization objectives within the TV,IRS Division. These training courses will be added to the existing required training for I and BM personnel only. Other organizations implementing the training will be directed by their management on which training is required.« less