Sample records for interim action record

  1. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, IHAAP 12 and 16 Landfills, Karnack, TX, September 27, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the LHAAP 12 and 16 landfills, Longhorn Army Ammunition Plant (LHAAP), Karnack, Texas. The Record of Decision for the sites addresses an Early Interim Remedial Action. The selected remedy consists of a multilayer landfill cap section which includes the following components: Foundation soil layer, Sodium Bentonite Geocomposite Liner, Geosynthetic Membrane Liner, Final soil cover, and Perimeter berms and drainage swales.

  2. 2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. E. Shanklin

    2007-02-14

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less

  3. 2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. Shanklin

    2006-07-19

    This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities fro the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13,more » Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003.« less

  4. Superfund record of decision (EPA Region 4): T. H. Agriculture and Nutrition Site, operable unit 1, Montgomery, AL, April 17, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.

  5. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCACO8000 L16100000 DX0000] Notice of..., California AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Establishment of Interim Final Supplementary Rules. SUMMARY: In accordance with the Record of Decision for the Sierra Resource Management Plan...

  6. 78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...

  7. Superfund explanation of significant difference for the record of decision (EPA Region 9): San Fernando Valley, Burbank Operable Unit, Los Angeles County, CA, November 21, 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    The decision document presents this Explanation of Significant Differences (ESD) to the interim remedial action selected in the San Fernando Valley, Burbank Operable Unit Record of Decision (ROD) signed June 1989 (PB90-114844).

  8. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  9. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  10. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less

  11. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  12. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  13. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  14. Superfund record of decision (EPA Region 7): Cornhusker Army Ammunition Plant, Operable Unit 1, Hall County, Grand Island, NE, September 29, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    The decision document presents the selected interim remedial action for the groundwater operable unit at the Cornhusker Army Ammunition Plant (CAAP). Operable Unit One encompasses the explosives groundwater plume(s), both on-post and off-post. Explosives of concern in the contaminant plume include RDX, TNT, HMX, and their decomposition products. The objective of the interim action is to contain the plume and prevent further migration of contaminants, and does not encompass full restoration of the plume of contaminated groundwater. The recommended alternatives provide an approach to containing and removing contaminant mass from the groundwater plume. This approach will control further migration ofmore » the plume and reduce the levels of the contamination in groundwater.« less

  15. Superfund record of decision (EPA Region 3): US Defense General Supply Center, Operable Unit 9, Chesterfield County, VA, September 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The decision document presents the selected interim remedial action for Operable Unit 9 (OU9) at the Defense General Supply Center (DGSC) in Chesterfield County, Virginia near Richmond. OU9 pertains to groundwater beneath Area 50, the Open Storage Area (OSA), and the Naitonal Guard Area (NGA). This operable unit is the third of nine operable units that are currently being addressed at the DGSC. OU9 addresses interim treatment and containment of groundwater in the upper and lower aquifers beneath Area 50, the OSA, and the NGA.

  16. Superfund record of decision (EPA Region 10): Elmendorf Air Force Base, Operable Unit 2, source area ST41, Anchorage, AK. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    The 13,130-acre Elmendorf Air Force Base (AFB) site is located adjacent to the municipality of Anchorage, Alaska. From 1940 to 1991, Elmendorf AFB used a 20-acre portion of the site, referred to as source area ST41, to store the fuel product JP-4 and aviation gasoline in four 1-million gallon underground tanks. As a result of numerous leaks and above-ground spills since the tanks were installed in the 1940s, USAF conducted investigations through its Installation Restoration Program (IRP). These investigations revealed several hundred thousand gallons of fuel in the ground water and soil. The ROD addresses an interim remedy at Elmendorfmore » AFB. The action is needed to reduce further spread of fuel constituents through the recovery of floating product on the ground water surface, and containment of seeps. Future RODs will include a final remedy for ground water and soil at ST41, as OU2, and will address the other six OUs at the site. The primary contaminants of concern affecting the ground water at ST41 are the compounds in JP-4, especially VOCs such as benzene, toluene, and xylenes. The selected interim remedial action for the site are included.« less

  17. Postconstruction report for the mercury tanks interim action at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voskuil, T.L.

    1993-09-01

    Three underground concrete settling tanks (tanks 2101-U, 2104-U, and 2100-U) at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee, contained contaminated sludges contributing mercury to the Upper East Fork Poplar Creek (UEFPC). These tanks were cleaned out as an interim action under the Comprehensive Environmental Response, Compensation, and Liability Act as part of the Reduction of Mercury in Plant Effluent subproject. Cleaning out these tanks prevented the sludge that had settled in the bottom from resuspending and carrying mercury into UEFPC. Tanks 2104-U and 2100-U were returned to service and will continue to receive effluent frommore » buildings 9201-4 and 9201-5. Tank 2101-U had been abandoned and its effluent redirected to Tank 2100-U during previous activities. This interim action permanently sealed Tank 2101-U from the storm sewer system. Upon removal of materials and completion of cleanup, inspections determined that the project`s cleanup criteria had been met. The structural integrity of the tanks was also inspected, and minor cracks identified in tanks 2101-U and 2104-U were repaired. This project is considered to have been completed successfully because it met its performance objectives as addressed in the Interim Record of Decision and the work plan: to remove the waste from the three storage tanks; to ensure that the tanks were cleaned to the levels specified; to return tanks 2100-U and 2104-U to service; to isolate Tank 2101-U permanently; and to manage the wastes in an appropriate fashion.« less

  18. Superfund Record of Decision (EPA Region 4): USMC Camp Lejeune Military Reservation, NC. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-23

    The 500-acre Camp Lejeune Military Reservation is located 15 miles southeast of Jacksonville, in Onslow County, North Carolina. Within the site lies the Hadnot Point Industrial Area (HPIA), which was constructed in the late 1930's. It is composed of 75 buildings and facilities, which include gas stations, offices, storage yards, maintenance shops, and a dry cleaning plant. Several areas of the HPIA have been investigated for potential contamination attributed to Marine Corps activities and operations that resulted in a generation of potentially hazardous wastes. The ROD addresses an interim remedial action for the shallow aquifer at the HPIA to protectmore » human health from exposure to VOCs and metals. The primary contaminants of concern affecting the shallow ground water aquifer are VOCs, including benzene and TCE; and metals, including arsenic, chromium, and lead.« less

  19. Superfund record of decision (EPA Region 5): Skinner Landfill, Butler County, Union Township, West Chester, OH. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 78-acre Skinner Landfill site is located in West Chester, Butler County, Ohio. Land use in the immediate vicinity includes business and residential uses to the west and crop farming to the north. The site was used in the past for the mining of sand and gravel, and was operated for the landfilling of a wide variety of materials from approximately 1934 through 1990. Materials deposited onsite include demolition debris, household refuse, and a wide variety of chemical wastes. In 1982, EPA conducted an investigation that showed that the groundwater southeast of the buried waste lagoon was contaminated with VOCs.more » RI studies conducted between 1986 and 1989 investigated the site ground water, surface water, soil, and sediment. In 1990, the state closed the site to further landfilling activities. The ROD is an interim action to protect human health by limiting site access to prevent ingestion of and direct contact with contaminated soil, and to protect the potentially affected users of ground water on and near the site. The primary contaminants of concern affecting the soil and ground water are VOCs, including benzene; organics, including PAHs, PCBs, and pesticides; and metals, including arsenic. The selected interim remedial action for the site are included.« less

  20. 76 FR 12550 - Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...

  1. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  2. Superfund Record of Decision (EPA Region 4): Milan Army Ammunition Plant, TN. (First remedial action), September 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-30

    The 22,436-acre Milan Army Ammunition Plant (MAAP) is located in western Tennessee, 5 miles east of Milan, Tennessee. The facility was constructed in 1941 to produce and store fuses, boosters, and small- and large-caliber ammunition. The ROD addresses an interim remedy for the contaminated ground water beneath and immediately downgradient from the former ponds as OU1. The primary contaminants of concern affecting the ground water are VOCs, including carbon disulfide; other organics, including HMX, RDX, 2,4,6-TNT, 2,4-DNT, 2,6-DNT, 1,3-DNB, 1,3,5-trinitrobenzene, and nitrobenzene; and inorganics, including nitrate.

  3. Maintenance action readiness assessment plan for White Oak Creek and Melton Branch Weir Stilling Pool cleanout at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-08-01

    This Readiness Assessment Plan has been prepared to document operational readiness for the following maintenance action: (1) removal of sediment from the White Oak Creek and Melton Branch Weir Stilling Pools and (2) disposal of the radiologically contaminated sediment in another location upstream of the weirs in an area previously contaminated by stream overflow from Melton Branch in Waste Area Grouping 2 (WAG) at Oak Ridge National Laboratory. This project is being performed as a maintenance action rather than an action under the Comprehensive Environmental Response, Compensation, and Liability Act because the risk to human health and environment is wellmore » below the US Environmental Protection Agency`s level of concern. The decision to proceed as a maintenance action was documented by an interim action proposed plan, which is included in the administrative record. The administrative record is available for review at the US Department of Energy Information Resource Center, 105 Broadway Avenue, Oak Ridge, Tennessee 37830.« less

  4. Pilot-scale treatability test plan for the 200-BP-5 operable unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less

  5. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  6. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  7. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  8. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  9. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... misconduct. Such an order will normally be issued on recommendation from OIG and in consultation with the...

  10. Superfund Record of Decision (EPA Region 9): El Toro Marine Corps Air Station, Operable Unit 2A (Site 24-VOC source area vadose zone), El Toro, CA, September 29, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Interim Record of Decision (ROD) presents the selected remedial action for vadose zone soil at Site 24 at Marine Corps Air Station (MCAS) El Toro, located in El Toro, California. The selected remedy for remediation of soil at Site 24 is soil vapor extraction (SVE), the US EPA presumptive remedy for VOC-contaminated soil. The process uses a vacuum to pull VOC-contaminated vapors from the soil through SVE wells.

  11. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  12. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  13. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC...

  14. Report of the Michigan Interim Action Committee on Indian Problems.

    ERIC Educational Resources Information Center

    Adams, Doris; And Others

    Stressing the importance of American Indian involvement in affairs affecting Michigan's Indian population, this report by the Interim Action Committee on Indian Problems presents recommendations relative to education, employment, health, and the Commission on Indian Affairs. Recommendations for the commission emphasize: leadership at the local,…

  15. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  16. Superfund Record of Decision (EPA Region 1): Otis Air National Guard/Camp Edwards, MA. (First remedial action), May 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-20

    The 22,000-acre Otis National Guard/Camp Edwards site is a former military vehicle maintenance facility on Cape Cod, Massachusetts, within the Massachusetts Military Reservation (MMR). The Area of Contamination Chemical Spill Area Number 4 (AOC CS-4) plume extends 11,000 feet and is located 1.1 miles from the southern boundary of MMR. Wastes and equipment handled at AOC CS-4 included oils, solvents, antifreeze, battery electrolytes, paint, and waste fuels. Additionally, the northern portion of AOC CS-4 was used as a storage yard for wastes generated by shops and laboratories operating at MMR. Liquid wastes were stored in containers or underground storage tanksmore » (USTs) in an unbermed area or deposited in USTs designated for motor gasoline. The ROD addresses OU2, the interim action for MMR AOC CS-4 ground water to prevent further down gradient migration of the contaminants. The primary contaminants of concern affecting the ground water are VOCs, including PCE and TCE.« less

  17. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  18. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  19. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  20. Superfund record of decision (EPA Region 1): Otis Air National Guard (containment of 7 groundwater plumes), Falmouth, MA, September 25, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusettes lies within the boundaries of Bourne, Mashpee, and Sandwich, and abuts Falmouth. Seven groundwater contaminant plumes have migrated beyond or are approaching the installation boundary. This interim remedial action will intercept the contaminated groundwater plumes to prevent further downgradient movement of the contaminants. Extraction and treatment will continue until the final remedy for the site is chosen.

  1. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  2. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  3. The Challenge of Declining Enrolments. Critical Emerging Problems and Recommendations for Immediate Action. Interim Report No. 2. [La Baisse des Effectifs Scolaires. Problemes Critiques et Recommandations pour une Action Immediate. Rapport Preliminaire No. 2].

    ERIC Educational Resources Information Center

    Jackson, Robert W. B.

    This second interim report on declining enrollment in Ontario identifies the major implications of the several factors associated with declining enrollments and makes recommendations for immediate action to contribute to the stability of the system while preparing and initiating long-term policies. The first part of the report deals with…

  4. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  5. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  6. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, Burning Ground Number 3, Karnack, TX, May 12, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the Burning Ground No. 3 site (the site), Longhorn Army Ammunition Plant, in Karnack, Texas. The major components of the selected remedy include: extraction and Treatment of contaminated shallow groundwater using Organic Air Stripping and Off-gas Treatment and Metals precipitation, and Excavation and Treatment of Source Material using Low Temperature Thermal Desorption and Catalytic Oxidation for off-gas.

  7. Superfund record of decision (EPA Region 4): Marine Corps Base (site 35), operable unit 10, Camp Lejeune, NC, September 22, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-01-01

    This decision document presents the selected remedy for surficial groundwater for a portion of Operable Unit (OU) No. 10 (Site 35), Marine Corps Base (MCB), Camp Lejeune, North Carolina. Five Remedial Action Alternatives (RAAs) were evaluated as part of an interim remedial investigation/feasibility study for surficial groundwater at OU No. 10 (Site 35). These RAAs included RAA 1 (No Action), RAA 2 (No Action With Institutional Controls), RAA 3 (Groundwater Collection and On-site Treatment), RAA 4 (In Situ Air Sparging and Off-Gas Carbon Adsorption) and RAA 5 (In Well Aeration and Off-Gas Adsorption). After all five RAAs were compared tomore » established criteria, RAA 5 was selected as the preferred alternative.« less

  8. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  9. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...

  10. 75 FR 77733 - Federal Acquisition Regulation; Preventing Abuse of Interagency Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments. SUMMARY: The..., including economies and efficiencies and the ability to leverage resources. This interim rule, which...

  11. 75 FR 7955 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists..., Engineering Management Branch, Mitigation Directorate, Federal Emergency Management Agency, 500 C Street SW...

  12. 76 FR 49674 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  13. 75 FR 41381 - Private Land Mobile Radio Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...] Private Land Mobile Radio Services AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile...

  14. 75 FR 7956 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA-2010-0003; Internal Agency Docket No. FEMA-B-1073] Changes in Flood Elevation Determinations AGENCY: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  15. 76 FR 20556 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  16. 76 FR 43601 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... stringent in their floodplain management requirements. The community may at any time enact stricter... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  17. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  18. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  19. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  20. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC... offices and funding components at any time to permit them to make appropriate interim responses to protect... making decisions about the award or continuation of funding. Research Misconduct Issues ...

  1. 77 FR 11385 - Security Considerations for Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...

  2. 76 FR 59066 - Notice of Regulatory Review Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... [No. 2011-N-10] Notice of Regulatory Review Plan AGENCY: Federal Housing Finance Agency. ACTION... of and requesting comments on the FHFA interim regulatory review plan for review of existing... comments on all aspects of the interim regulatory review plan, including legal and policy considerations...

  3. 76 FR 68322 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  4. 75 FR 18082 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  5. 75 FR 29210 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  6. 76 FR 21662 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  7. 75 FR 81889 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  8. 76 FR 21660 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... floodplain management requirements. The community may at any time enact stricter requirements of its own or... DEPARTMENT OF HOMELAND SECURITY Federal Emergency Management Agency 44 CFR Part 65 [Docket ID FEMA...: Federal Emergency Management Agency, DHS. ACTION: Interim rule. SUMMARY: This interim rule lists...

  9. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2011-0104] RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY: Social Security Administration. ACTION: Notice of.... We strongly urge you not to include in your comments any personal information, such as Social...

  10. 76 FR 71465 - Defense Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...

  11. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  12. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... interim measures necessary to ensure the protection of human health and the environment. Interim measures... supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may occur if remedial... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  13. 78 FR 38843 - Single Application Option

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Application Option AGENCY: U.S. Copyright Office, Library of Congress. ACTION: Interim final rule. SUMMARY: The U.S. Copyright Office is amending its regulations on an interim basis in order to establish a new... an additional option for individual authors/claimants registering a single (one) work that is not a...

  14. 76 FR 52547 - Importation of Horses From Contagious Equine Metritis-Affected Countries

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... DEPARTMENT OF AGRICULTURE Animal and Plant Health Inspection Service 9 CFR Part 93 [Docket No... AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule; delay of enforcement and... additional time to comment on the interim rule and provide the Animal and Plant Health Inspection Service...

  15. 78 FR 24331 - Apricots Grown in Designated Counties in Washington; Temporary Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Docket No. AMS-FV-12-0028... Regulations AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule... the marketing order for apricots grown in designated Counties in Washington. The interim rule...

  16. 75 FR 45678 - Notice of Availability of Interim Staff Guidance Document for Fuel Cycle Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... Document for Fuel Cycle Facilities AGENCY: Nuclear Regulatory Commission. ACTION: Notice of availability..., Division of Fuel Cycle Safety and Safeguards, Office of Nuclear Material Safety and Safeguards, U.S... Commission (NRC) prepares and issues Interim Staff Guidance (ISG) documents for fuel cycle facilities. These...

  17. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  18. 78 FR 41125 - Interim Enforcement Policy for Permanent Implant Brachytherapy Medical Event Reporting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... Brachytherapy Medical Event Reporting AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... medical events occurring under an NRC licensee's permanent implant brachytherapy program. This interim..., ``Adequacy of Medical Event Definitions in 10 CFR [Title 10 of the Code of Federal Regulations] 35.3045, and...

  19. 76 FR 78465 - Home Mortgage Disclosure (Regulation C)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... 44 U.S.C. 1510. #0; #0;The Code of Federal Regulations is sold by the Superintendent of Documents. #0... Mortgage Disclosure (Regulation C) AGENCY: Bureau of Consumer Financial Protection. ACTION: Interim final... a new Regulation C (Home Mortgage Disclosure). This interim final rule does not impose any new...

  20. 16 CFR 1209.37 - Corrective actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Commercial Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.37 Corrective actions. (a) Test failure... insulation product itself. Corrective action may consist of equipment adjustment, equipment repair, equipment...

  1. 78 FR 22257 - Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-OAR-2007-0268; FRL-9707-2] Updates to Protective Action Guides Manual: Protective Action Guides (PAGs) and Planning Guidance for Radiological Incidents AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of document availability for interim use and public...

  2. Treatability Study in Support of Intrinsic Remediation for Site ST41. Elmendorf Air Force Base, Anchorage, Alaska

    DTIC Science & Technology

    1995-10-01

    BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system

  3. 77 FR 25910 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION...) for rail banking and interim trail use under the National Trails System Act (Trails Act). New rules are adopted that require the parties jointly to notify the Board when an interim trail use/rail...

  4. 75 FR 36643 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an...

  5. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...

  6. 78 FR 52079 - Oranges, Grapefruit, Tangerines, and Tangelos Grown in Florida; Relaxing Size and Grade...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-22

    ... Requirements on Valencia and Other Late Type Oranges AGENCY: Agricultural Marketing Service, USDA. ACTION...). The interim rule reduced the minimum size for Valencia and other late type oranges shipped to... interim rule also lowered the minimum grade for Valencia and other late type oranges shipped to interstate...

  7. 77 FR 66920 - Registration of Claims to Copyright: Group Registration of Serial Issues Filed Electronically

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... LIBRARY OF CONGRESS Copyright Office 37 CFR Part 202 [Docket No. RM 2012-11] Registration of..., Library of Congress. ACTION: Interim regulations. SUMMARY: The Copyright Office is adopting interim..., applicants must still send two complimentary subscription copies of the serial promptly to the Library of...

  8. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  9. 78 FR 78838 - Grant of Interim Extension of the Term of U.S. Patent No. 5,496,801; Recombinant Human...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... Hormone AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term... No. 5,496,801. The patent claims the human biological product recombinant human parathyroid hormone... human parathyroid hormone, was filed on October 24, 2013, and is currently undergoing regulatory review...

  10. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  11. 77 FR 28765 - Homeless Emergency Assistance and Rapid Transition to Housing: Emergency Solutions Grants Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... program. The heading for this rule displayed a RIN number of 2506-AC29, which was incorrect. RIN number.... ACTION: Interim rule; correction. SUMMARY: The document advises that the interim rule for the Emergency Solutions Grants program, published on December 5, 2011, displayed an incorrect RIN number. This document...

  12. 49 CFR 190.235 - Civil actions generally.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Civil actions generally. 190.235 Section 190.235... PROCEDURES Enforcement Specific Relief § 190.235 Civil actions generally. Whenever it appears to the... or appropriate, including mandatory or prohibitive injunctive relief, interim equitable relief, civil...

  13. CCSS Literacy and Math Tools: An Interim Report on Implementation and Sustainability during the Pilot Year

    ERIC Educational Resources Information Center

    Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce

    2011-01-01

    This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…

  14. 75 FR 56601 - Privacy Act of 1974: New System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ...The Patient Protection and Affordable Care Act (the Affordable Care Act), Public Law 111-148, was enacted on March 23, 2010; the Health Care and Education Reconciliation Act (the Reconciliation Act), Public Law 111-152, was enacted on March 30, 2010. The Affordable Care Act and implementing regulations (codified in HHS interim final rules (IFR) at 45 CFR Part 147) require that non-grandfathered health insurance plans and issuers offering group and individual coverage have effective internal claims and appeals and external review processes. The effective date for these requirements is plan or policy years beginning on or after September 23, 2010. Regarding external review, the statute requires that health plans and issuers must comply with either a state external review process or a process meeting standards issued by the Secretary of Health and Human Services (HHS) that is ``similar to'' a state process meeting requirements in section 2719 (a ``federal external review process''). The IFR includes a transition period prior to July 1, 2011, during which time HHS will work with states to assist in making any necessary changes so that the state process will meet the minimum consumer protections identified in 45 CFR 147.136 that must be met in order for the state process to apply. During this interim period, health insurance issuers in states with external review laws in effect prior to September 23, 2010 will follow that state's external review law to the extent applicable. In states that have not passed an external review law that is in effect on September 23, 2010, a health insurance issuer must follow an interim federal external review process that will be administered by the Office of Personnel Management (OPM). The system of records will be created as OPM assists HHS by providing external reviews of adverse benefit determinations and final internal adverse benefit determinations as requested by eligible claimants and their authorized representatives (``claimants''). The system of records will include any data relevant to these external reviews, and OPM proposes to add this new system of records to its inventory of records systems subject to the Privacy Act of 1974 (5 U.S.C. 552a), as amended. This action is necessary to meet the requirements of the Privacy Act to publish in the Federal Register notice of the existence and character of records maintained by the agency (5 U.S.C. 552a(e)(4)).

  15. Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action

    DTIC Science & Technology

    1991-09-30

    4. TITLE AND SUBTITLE 5 . FUNDING NUMBERS Comparison of RCRA SWMU Corrective Action and CERCLA Remedial Action 6. AUTHOR(S) Sam Capps Rupe, Major -1...Interim Status for TSD Facilities .................... 19 5 . Closure and Postclosure Requirements for TSD Facilities ........... 25 D. State Role... 65 1. RCRA Facility Assessment . ............................... 65 2. RCRA Facility Investigation . .............................. 66 3

  16. Record of decision, Bomarc Missile Accident Site, Mcguire AFB, New Jersey. Final report, November 1989-May 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, G.

    1992-11-20

    This document presents the selected final remedial action for the radioactive wastes at the BOMARC Missile Site, McGuire Air Force Base, New Jersey. The BOMARC Missile Site became contaminated in 1960 as the result of a fire which partially consumed a nuclear warhead-equipped BOMARC missile. The Air Force has decided to pursue excavation and Off-site Disposal of contaminated waste at a Department of Energy (DOE) disposal facility. This is a cost effective, permanent remedy, and is the environmentally preferred alternative. However, should the Air Force be denied the use of a DOE facility, or if other events should dramatically decreasemore » the cost effectiveness of this remedy, then as an interim remedy, the Air Force will maintain the BOMARC Missile Site in accordance with the NEPA No Action Alternative.« less

  17. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  18. Rural applications of advanced traveler information systems : recommended actions

    DOT National Transportation Integrated Search

    1997-07-01

    The Recommended Action Plan is one in a series of interim documents for the Rural Applications of Advanced Traveler Information Systems (ATIS) project. Based on the investigation of user needs, a technology review, and concept development and assessm...

  19. 77 FR 50069 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    .... Grace & Co., Inc./Wayne Interim Storage (USDOE) Superfund Site AGENCY: Environmental Protection Agency... issuing a Notice of Intent to Delete the W.R. Grace & Co., Inc./Wayne Interim Storage (USDOE) Superfund..., NY 10007-1866. Hand Delivery: U.S. EPA Superfund Records Center, Region II, 290 Broadway, 18th Floor...

  20. Elimination of exemptions for chemical mixtures containing the list I chemicals ephedrine and/or pseudoephedrine. Final rule.

    PubMed

    2008-07-10

    The Drug Enforcement Administration (DEA) is finalizing, without change, the Interim Rule with Request for Comment published in the Federal Register on July 25, 2007 (72 FR 40738). The Interim Rule removed the Controlled Substances Act (CSA) exemptions for chemical mixtures containing ephedrine and/or pseudoephedrine with concentration limits at or below five percent. Upon the effective date of the Interim Rule, all ephedrine and pseudoephedrine chemical mixtures, regardless of concentration and form, became subject to the regulatory provisions of the CSA. DEA regulated the importation, exportation, manufacture, and distribution of these chemical mixtures by requiring persons who handle these chemical mixtures to register with DEA, maintain certain records common to business practice, and file certain reports, regarding these chemical mixtures. No comments to the Interim Rule were received. This Final Rule finalizes the Interim Rule without change.

  1. Financial responsibilities under RCRA. Hearing before the Subcommittee on Commerce, Transportation, and Tourism of the Committee on Energy and Commerce, House of Representatives, Ninety-Ninth Congress, First Session on H. R. 3692, November 13, 1985

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-01-01

    Representatives of environmental organizations, the Hazardous Waste Treatment Council, and regulators were among those testifying at a hearing on H.R. 3692, which amends the Resource Conservation and Recovery Act (RCRA) of 1976. The bill is in response to concerns that the Environmental Protection Agency (EPA) has not compiled with the intent of RCRA in its failure to move beyond interim permits to issue final permits to land disposal facilities accepting hazardous wastes. Reported leakage and environmental risks from sites operating under interim permits raises questions about how disposal companies could deal with liability claims. At issue was whether Congress needsmore » to take new action to develop regulations under which financially responsible companies can operate or whether new EPA rules can solve the problem. A spokesman for EPA reviewed the liability insurance problem and the status of the insurance market in this context. Material submitted for the record follows the text of H.R. 3692 and the testimony of 11 witnesses.« less

  2. 37 CFR 201.38 - Designation of agent to receive notification of claimed infringement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... person signing the Notice, and by the date of signature. (e) Filing. A service provider may file the.... The Copyright Office does not provide printed forms for filing an Interim Designation of Agent to... shall be accompanied by a filing fee for Recordation of an Interim Designation of Agent to Receive...

  3. Health information technology: initial set of standards, implementation specifications, and certification criteria for electronic health record technology. Interim final rule.

    PubMed

    2010-01-13

    The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  4. Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. B. Mitchem

    2001-08-22

    This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

  5. 10 CFR 1021.211 - Interim actions: Limitations on actions during the NEPA process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... during the NEPA process. While DOE is preparing an EIS that is required under § 1021.300(a) of this part, DOE shall take no action concerning the proposal that is the subject of the EIS before issuing an ROD... which an EIS is being prepared shall not be categorically excluded under subpart D of these regulations...

  6. Exceptions or alternatives to labeling requirements for products held by the Strategic National Stockpile. Final rule.

    PubMed

    2012-02-06

    The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.

  7. 76 FR 8366 - Science Advisory Board Staff Office; Request for Nominations; SAB Environmental Justice Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Nominations; SAB Environmental Justice Technical Panel AGENCY: Environmental Protection Agency (EPA). ACTION... experts to serve on the SAB Environmental Justice Technical (EJT) Panel. DATES: Nominations should be...) released the Interim Guidance on Considering Environmental Justice During the Development of an Action...

  8. Superfund Record of Decision (EPA Region 5): Better Brite Plating Chrome and Zinc, De Pere, WI. (First remedial action), June 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 2-acre Better Brite Plating Chrome and Zinc site is composed of two plating facilities in De Pere, Brown County, Wisconsin. The site includes the 1.5-acre Chrome Shop and the 0.5-acre Zinc Shop. Land use in the area is predominantly residential and commercial, with a wetlands located approximately one-quarter mile from the site. The estimated 15,000 area residents use the municipal wells drawing from the deep aquifer as a drinking water supply. The Zinc Shop has a long history of improper operational procedures and spills into the surrounding soil. The selected remedial action for this interim remedy includes continuing andmore » expanding the current operation of the ground water extraction system and pretreatment facility, which will include pretreatment of the additional water collected by the surface water and ground water collection systems, and the Chrome and Zinc shops, with discharge to the De Pere wastewater system.« less

  9. 16 CFR 1209.38 - Records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Practices CONSUMER PRODUCT SAFETY COMMISSION CONSUMER PRODUCT SAFETY ACT REGULATIONS INTERIM SAFETY STANDARD FOR CELLULOSE INSULATION Certification § 1209.38 Records. (a) Establishment and maintenance. Each... product specification containing all information required by § 1209.35. (This includes information...

  10. 76 FR 45174 - State Official Notification Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... granted in section 1042(a) to enforce the Act or regulations prescribed thereunder. This interim final... actions or proceedings undertaken under section 1042(a) of the Act, 12 U.S.C. 5552(a), to enforce the Act... than 10 days prior to initiating an action to enforce the Act or any regulation prescribed thereunder...

  11. "Winsight"™ Assessment System: Preliminary Theory of Action. Research Report. ETS RR-17-26

    ERIC Educational Resources Information Center

    Wylie, E. Caroline

    2017-01-01

    The "Winsight"™Assessment System integrates summative, interim (including both benchmark assessments and testlets), and formative assessment components initially focused on mathematics and English language arts (ELA) in Grades 3-8 and high school.This report provides a preliminary theory of action for the Winsight Assessment System. A…

  12. Interim reliability evaluation program, Browns Ferry fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, M.E.

    1981-01-01

    An abbreviated fault tree method is used to evaluate and model Browns Ferry systems in the Interim Reliability Evaluation programs, simplifying the recording and displaying of events, yet maintaining the system of identifying faults. The level of investigation is not changed. The analytical thought process inherent in the conventional method is not compromised. But the abbreviated method takes less time, and the fault modes are much more visible.

  13. Superfund Record of Decision (EPA Region 7): Lake City Army Ammunition Plant (NW Lagoon), Independence, MO, September 29, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1999-03-01

    This decision document describes the selected Interim Remedial Action (IRA) for the Northeast Corner Operable Unit (NECOU), Lake City Army Ammunition Plant (LCAAP). The major components of the selected IRA for the NECOU include: Installation of a subsurface permeable reactive wall (PRW) to treat contaminated ground water in place (in-situ); A monitoring program to evaluate the effectiveness of The PRW in treating the contaminated ground water and to determine the replacement period of the reactive media; and Installation of a soil cover over the Area 17 Oil and Solvent Pits (a principal threat waste) located adjacent to the current sanitarymore » landfill in the NECOU to minimize infiltration of water through the pits and subsequently into ground water.« less

  14. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  15. Autoregressive Processes in Homogenization of GNSS Tropospheric Data

    NASA Astrophysics Data System (ADS)

    Klos, A.; Bogusz, J.; Teferle, F. N.; Bock, O.; Pottiaux, E.; Van Malderen, R.

    2016-12-01

    Offsets due to changes in hardware equipment or any other artificial event are all a subject of a task of homogenization of tropospheric data estimated within a processing of Global Navigation Satellite System (GNSS) observables. This task is aimed at identifying exact epochs of offsets and estimate their magnitudes since they may artificially under- or over-estimate trend and its uncertainty delivered from tropospheric data and used in climate studies. In this research, we analysed a common data set of differences of Integrated Water Vapour (IWV) from GPS and ERA-Interim (1995-2010) provided for a homogenization group working within ES1206 COST Action GNSS4SWEC. We analysed daily IWV records of GPS and ERA-Interim in terms of trend, seasonal terms and noise model with Maximum Likelihood Estimation in Hector software. We found that this data has a character of autoregressive process (AR). Basing on this analysis, we performed Monte Carlo simulations of 25 years long data with two different noise types: white as well as combination of white and autoregressive and also added few strictly defined offsets. This synthetic data set of exactly the same character as IWV from GPS and ERA-Interim was then subjected to a task of manual and automatic/statistical homogenization. We made blind tests and detected possible epochs of offsets manually. We found that simulated offsets were easily detected in series with white noise, no influence of seasonal signal was noticed. The autoregressive series were much more problematic when offsets had to be determined. We found few epochs, for which no offset was simulated. This was mainly due to strong autocorrelation of data, which brings an artificial trend within. Due to regime-like behaviour of AR it is difficult for statistical methods to properly detect epochs of offsets, which was previously reported by climatologists.

  16. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  17. There Is an Alternative: A Report on an Action Research Project to Develop a Framework for Co-Operative Higher Education

    ERIC Educational Resources Information Center

    Neary, Mike; Winn, Joss

    2017-01-01

    This report provides an interim account of a participatory action research project undertaken during 2015-16. The research brought together scholars, students and expert members of the co-operative movement to design a theoretically informed and practically grounded framework for co-operative higher education that activists, educators and the…

  18. Hanford Site 100-N Area In Situ Bioremediation of UPR-100-N-17, Deep Petroleum Unplanned Release - 13245

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saueressig, Daniel G.

    2013-07-01

    In 1965 and 1966, approximately 303 m{sup 3} of Number 2 diesel fuel leaked from a pipeline used to support reactor operations at the Hanford Site's N Reactor. N Reactor was Hanford's longest operating reactor and served as the world's first dual purpose reactor for military and power production needs. The Interim Action Record of Decision for the 100-N Area identified in situ bioremediation as the preferred alternative to remediate the deep vadose zone contaminated by this release. A pilot project supplied oxygen into the vadose zone to stimulate microbial activity in the soil. The project monitored respiration rates asmore » an indicator of active biodegradation. Based on pilot study results, a full-scale system is being constructed and installed to remediate the vadose zone contamination. (authors)« less

  19. Superfund Record of Decision (EPA Region 3): William Dick Lagoons, West Caln Township, Chester County, PA. (First remedial action), June 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-28

    The 4.4-acre William Dick Lagoons site is a chemical wastewater disposal site in West Caln Township, Chester County, Pennsylvania. An estimated 30 residences located within 1,000 feet of the site use private wells for their drinking water supply. Two other Superfund sites are near the site. From the 1950's to 1970, Mr. William Dick used the lagoons to dispose of wastewater left from cleaning the interiors of chemical and petroleum tank trailers owned primarily by Chemical Leaman Tank Lines, (CLTL), and residual chemical products. Later in 1970, vandalism caused the release of an estimated 300,000 gallons of wastewater into Birchmore » Run, a tributary of the West Branch of Brandywine Creek. As a result of this discharge, more than 2,600 fish died, and water supplies that used Brandywine Creek as a water source were closed. The Record of Decision (ROD) provides an interim remedy and addresses contaminated residential water as Operable Unit 1 (OU1) and ground water as OU2. A future ROD will address source control and will provide a remedy for the cleanup of contaminated soil. The primary contaminants of concern affecting the ground water are VOCs including benzene, PCE, and TCE; other organics including phenols; and metals. The selected remedial action for the site is included.« less

  20. A Comprehensive Evaluation of the Community Action Program in Austin and Travis County, Texas. Final Report.

    ERIC Educational Resources Information Center

    Tracor, Inc., Austin, TX.

    Produced in four parts, this report covers a study of poor people in Austin, Texas, begun in 1967. Initial research efforts defined the problem and identified the population to be studied. An interim report was then made on the first year's findings. This involved evaluating some of the community action programs (CAP) and identifying and analyzing…

  1. 36 CFR 1206.84 - What is the format and content of the narrative report?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES NATIONAL HISTORICAL PUBLICATIONS AND RECORDS COMMISSION Grant Administration § 1206.84 What is the format and content of the narrative report? (a) Interim narrative reports should state briefly the performance objectives and activities for the entire grant and...

  2. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING RECORDS AND...

  3. Federal enforcement in group and individual health insurance markets. Final rule.

    PubMed

    2005-11-25

    This rule makes final an interim final rule that details procedures we use for enforcing title XXVII of the Public Health Service Act as added by the Health Insurance Portability and Accountability Act of 1996, and as amended by the Mental Health Parity Act of 1996, the Newborns' and Mothers' Health Protection Act of 1996, and the Women's Health and Cancer Rights Act of 1998. Specifically, we are responsible for enforcing title XXVII requirements in States that do not enact the legislation necessary to enforce those requirements, or otherwise fail to substantially enforce the requirements. We are also responsible for taking enforcement actions against non-Federal governmental plans. The regulation describes the process we use in both enforcement contexts. This final rule deletes an appendix to the interim rule that listed examples of violations of title XXVII and corrects the description of a cross-reference, but makes no substantive changes to the interim final rule.

  4. GUIDE TO CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOIL WASHING - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  5. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: SOLVENT EXTRACTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design/remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation and Liabi...

  6. GUIDE FOR CONDUCTING TREATABILITY STUDIES UNDER CERCLA: THERMAL DESORPTION - INTERIM GUIDANCE

    EPA Science Inventory

    Systematically conducted, well-documented treatability studies are an important component of the remedial investigation/feasibility study (RI/FS) process and the remedial design remedial action (RD/RA) process under the Comprehensive Environmental Response, Compensation, and Liab...

  7. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1,more » data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.« less

  8. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC-ORDS AND...

  9. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...., carbon dioxide, sodium chloride, urea, silver iodide). (c) The totals for the items in paragraph (b) of... AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC-ORDS AND...

  10. 75 FR 38791 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... Children's Products: Vinyl Plastic Film. 2. Cribs--Notice of Proposed Rulemaking (NPR). 3. Interim Policy....gov/webcast . For a recorded message containing the latest agenda information, call (301) 504-7948...

  11. 78 FR 11483 - Disclosure of Records and Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ....12(b) requires the Bureau to establish an electronic FOIA reading room on its Web site to house the... make such records available at its headquarters in a physical reading room that is accessible to the... interim final rule without modification, except that it updates the address of the reading room to reflect...

  12. 47 CFR 73.9008 - Interim approval of authorized digital output protection technologies and authorized recording...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... certification pursuant to § 0.459 of this chapter. (b) Initial certification window. Following the effective... window for digital output protection technologies or recording methods. Within thirty (30) days after the... certification window, the Commission shall issue a public notice identifying the certifications received and...

  13. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  14. 10 CFR 712.19 - Removal from HRP.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY HUMAN RELIABILITY PROGRAM Establishment of and Procedures for the Human Reliability Program... immediately remove that individual from HRP duties pending a determination of the individual's reliability. A... HRP duties pending a determination of the individual's reliability is an interim, precautionary action...

  15. Final Environmental Assessment for the CV-22 Interim Beddown

    DTIC Science & Technology

    2016-04-01

    as asbestos -containing materials and lead-based paints, depending on the age of the buildings demolished. The Proposed Action and proposed...Demolition could generate additional hazardous wastes and materials such as asbestos -containing materials and lead-based paints, depending on the

  16. 75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111

  17. 76 FR 40777 - Interim Enforcement Policy for Certain Fire Protection Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Certain Fire Protection Issues AGENCY: Nuclear Regulatory Commission. ACTION: Policy statement; revision... Enforcement Policy on enforcement discretion for certain fire protection issues to extend the enforcement... policy affects licensees that are transitioning to use the National Fire Protection Association Standard...

  18. 40 CFR 52.1120 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a new regulation 310 CMR 7.19 “Interim Sulfur-in-Fuel Limitations for Fossil Fuel Utilization... May 22, 1985, including Method 27, record form, potential leak points, major tank truck leak sources...

  19. 40 CFR 52.1120 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a new regulation 310 CMR 7.19 “Interim Sulfur-in-Fuel Limitations for Fossil Fuel Utilization... May 22, 1985, including Method 27, record form, potential leak points, major tank truck leak sources...

  20. 40 CFR 52.1120 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a new regulation 310 CMR 7.19 “Interim Sulfur-in-Fuel Limitations for Fossil Fuel Utilization... May 22, 1985, including Method 27, record form, potential leak points, major tank truck leak sources...

  1. 40 CFR 52.1120 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a new regulation 310 CMR 7.19 “Interim Sulfur-in-Fuel Limitations for Fossil Fuel Utilization... May 22, 1985, including Method 27, record form, potential leak points, major tank truck leak sources...

  2. 40 CFR 52.1120 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a new regulation 310 CMR 7.19 “Interim Sulfur-in-Fuel Limitations for Fossil Fuel Utilization... May 22, 1985, including Method 27, record form, potential leak points, major tank truck leak sources...

  3. A Computerized Classroom Language Management and Recording System for Deaf and Hard of Hearing Children.

    ERIC Educational Resources Information Center

    Bornstein, Harry; Casella, Vicki

    This interim report describes the development of a networked computerized classroom language management and recording system to assist teachers of children who are deaf or hard-of-hearing. The system will provide storage and access capability for such information as changes in instruction, language learning progress, modifications in communication…

  4. 75 FR 9114 - Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 217 Defense Federal Acquisition Regulation Supplement; Additional Requirements Applicable to Multiyear Contracts (DFARS Case 2008-D023) AGENCY: Defense Acquisition Regulations System. Department of Defense (DoD). ACTION: Interim rule...

  5. 75 FR 39414 - Federal Acquisition Regulation; FAR Case 2008-039, Reporting Executive Compensation and First...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... DEPARTMENT OF DEFENSE GENERAL SERVICES ADMINISTRATION NATIONAL AERONAUTICS AND SPACE... National Aeronautics and Space Administration (NASA). ACTION: Interim rule with request for comments... free, public, online Web site containing full disclosure of all Federal contract award information, the...

  6. 76 FR 81789 - Consumer Leasing (Regulation M); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1013 [Docket No. CFPB-2011-0026] RIN 3170-AA06 Consumer Leasing (Regulation M); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION...). The interim final rule established a new Regulation M (Consumer Leasing) in accordance with the...

  7. 76 FR 75771 - Emergency Planning Guidance for Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... Guidance for Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Issuance of NUREG... Support of Nuclear Power Plants;'' NSIR/DPR-ISG-01, ``Interim Staff Guidance Emergency Planning for Nuclear Power Plants;'' and NUREG/CR-7002, ``Criteria for Development of Evacuation Time Estimate Studies...

  8. 77 FR 25630 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    .... 120316196-2195-01] RIN 0648-BB89 Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Interim Action; Withdrawn AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA...

  9. 75 FR 80335 - Federal Government Participation in the Automated Clearing House

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Participation in the Automated Clearing House AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Interim final rule. SUMMARY: The Department of the Treasury, Financial Management Service (FMS... include the agency name (``Financial Management Service'') and docket number FISCAL-FMS-2010- 0003 for...

  10. 75 FR 13680 - Commutation of Sentence: Technical Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Sentence: Technical Change AGENCY: Bureau of Prisons, Justice. ACTION: Interim rule. SUMMARY: This document makes a minor technical change to the Bureau of Prisons (Bureau) regulations on sentence commutation to.... Commutation of Sentence: Technical Change This document makes a minor technical change to the Bureau...

  11. 76 FR 70639 - Agricultural Career and Employment Grants Program; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... DEPARTMENT OF AGRICULTURE Office of Advocacy and Outreach 7 CFR Part 2502 RIN 0503-AA49 Agricultural Career and Employment Grants Program; Correction AGENCY: Office of Advocacy and Outreach, Departmental Management, USDA. ACTION: Interim rule with request for comments; correction. SUMMARY: On November...

  12. 77 FR 66578 - Cancellation of Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Indianapolis Grain Inspection & Weighing Service, Inc. Designation; Selection of Interim Provider; Opportunity for Designation in the Indianapolis, IN Area; Correction AGENCY: Grain Inspection, Packers and Stockyards Administration, USDA. ACTION: Notice; correction. SUMMARY: The USDA, Grain Inspection, Packers and...

  13. Increasing frequency and duration of Arctic winter warming events

    NASA Astrophysics Data System (ADS)

    Graham, R. M.; Cohen, L.; Petty, A.; Boisvert, L.; Rinke, A.; Hudson, S. R.; Nicolaus, M.; Granskog, M. A.

    2017-12-01

    Record low Arctic sea ice extents were observed during the last three winter seasons (March). During each of these winters, near-surface air temperatures close to 0°C were observed, in situ, over sea ice in the central Arctic. Recent media reports and scientific studies suggest that such winter warming events were unprecedented for the Arctic. Here we use in situ winter (December-March) temperature observations, such as those from Soviet North Pole drifting stations and ocean buoys, to determine how common Arctic winter warming events are. The earliest record we find of a winter warming event was in March 1896, where a temperature of -3.7˚C was observed at 84˚N during the Fram expedition. Observations of winter warming events exist over most of the Arctic Basin. Despite a limited observational network, temperatures exceeding -5°C were measured in situ during more than 30% of winters from 1954 to 2010, by either North Pole drifting stations or ocean buoys. Correlation coefficients between the atmospheric reanalysis, ERA-Interim, and these in-situ temperature records are shown to be on the order of 0.90. This suggests that ERA-Interim is a suitable tool for studying Arctic winter warming events. Using the ERA-Interim record (1979-2016), we show that the North Pole (NP) region typically experiences 10 warming events (T2m > -10°C) per winter, compared with only five in the Pacific Central Arctic (PCA). We find a positive trend in the overall duration of winter warming events for both the NP region (4.25 days/decade) and PCA (1.16 days/decade), due to an increased number of events of longer duration.

  14. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  15. Superfund record of decision (EPA Region 5): Muskego Sanitary Landfill, Muskego, WI. (First remedial action), June 1992. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-06-12

    The 56-acre Muskego Sanitary Landfill site was located in the City of Muskego, Waukesha County, Wisconsin. From the 1950's to 1981, municipal waste, waste oils, paint products, and other waste were disposed of at the site. The site was separated into three disposal areas: the Old Fill Area (38 acres); the Southeast Fill Area (16 acres); and the Non-Contiguous Fill Area (4.2 acres), composed of a drum trench, north and south refuse trenches, and an L-shaped fill area, all containing waste similar to the Old Fill Area. As a result of deteriorating water quality at onsite ground water monitoring wells,more » Waste Management of Wisconsin Inc. (WMWI) and the state conducted numerous investigations that revealed elevated levels of contaminants in the ground water. Two separate areas at the site were discovered to contain buried drums and contaminated soil. The first area was located east of the Non-Contiguous Fill Area. The second area, known as the drum trench, was discovered in a portion of the Non-Contiguous Fill Area and contained 989 drums and 2,500 cubic yards of contaminated soil. The interim ROD addressed the control and remediation of the contamination sources, including landfill waste, contaminated soils, leachate, and landfill gas. The primary contaminants of concern affecting the soil and ground water were VOCs, including benzene, toluene, and xylenes; and other organics, including chlorinated ethanes, ketones, PAHs, PCBs, pesticides, phenols, and phthalates.« less

  16. 78 FR 79567 - Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...

  17. 75 FR 80678 - Conversions of Insured Credit Unions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... Conversions of Insured Credit Unions AGENCY: National Credit Union Administration (NCUA). ACTION: Interim... of the phrase ``Regional Director'' in NCUA's rule on credit union to mutual savings bank conversions and to add the same revised definition of that phrase to NCUA's rule on conversions to nonfederal...

  18. 77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...

  19. 77 FR 40459 - Electronic Fund Transfers (Regulation E); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Electronic Fund Transfers (Regulation E); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION... published the Final Rule (77 FR 6194), which implements the Electronic Fund Transfer Act, and the official... Sec. 1005.3(a) in the interim final rule, Electronic Fund Transfers (Regulation E), published on...

  20. Residential Energy Consumption Survey (RECS): National interim energy consumption survey, 1978-1979, household monthly energy consumption and expenditures. Shopper's guide

    NASA Astrophysics Data System (ADS)

    Windell, P.

    1981-08-01

    The data from the National Interim Energy Consumption Survey (NIECS) is available to the public on machine readable magnetic tapes. Brief overviews of the Residential Energy Consumption Survey as a whole and of the NIECS in particular is a brief description of each of the files included in this tape, and a list of the variables in the data set are included. A copy of the fuel supplier record form used to collect consumption and expenditure data for each of the sample households is also included.

  1. Implementation of a low-cost Interim 21CFR11 compliance solution for laboratory environments.

    PubMed

    Greene, Jack E

    2003-01-01

    In the recent past, compliance with 21CFR11 has become a major buzzword within the pharmaceutical and biotechnology industries. While commercial solutions exist, implementation and validation are expensive and cumbersome. Frequent implementation of new features via point releases further complicates purchasing decisions by making it difficult to weigh the risk of non-compliance against the costs of too frequent upgrades. This presentation discusses a low-cost interim solution to the problem. While this solution does not address 100% of the issues raised by 21CFR11, it does implement and validate: (1) computer system security; (2) backup and restore ability on the electronic records store; and (3) an automated audit trail mechanism that captures the date, time and user identification whenever electronic records are created, modified or deleted. When coupled with enhanced procedural controls, this solution provides an acceptable level of compliance at extremely low cost.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartman, Mary J.; Peterson, Robert E.

    This report presents and discusses results of the fiscal year 2003 sampling event associated with aquifer tubes along the Columbia River in the northern Hanford Site. Aquifer tube data help define the extent of groundwater contamination near the river, determine vertical variations in contamination, monitor the performance of interim remedial actions near the river, and support impact studies.

  3. 78 FR 56837 - 2012 Liquid Chemical Categorization Updates

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 46 CFR Parts 30, 150, and 153 [Docket No. USCG-2013-0423] RIN 1625-AB94 2012 Liquid Chemical Categorization Updates AGENCY: Coast Guard, DHS. ACTION: Interim rule; delay of effective date. SUMMARY: The Coast Guard is delaying the effective date of this...

  4. 77 FR 19525 - National School Lunch Program: School Food Service Account Revenue Amendments Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...

  5. 75 FR 17145 - Food Additives; Bisphenol A; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... five documents related to FDA's continuing assessment of Bisphenol A (BPA) and soliciting public...). These documents do not represent an agency opinion or position on BPA, on which an interim update was... assessment of BPA. This action will enable FDA to consider comments from the public in its assessment of BPA...

  6. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  7. THE REDUCTIVE TRANSFORMATION OF PERCHLORATE IN A FRESH WATER SEDIMENT: LABORATORY BATCH STUDIES.

    EPA Science Inventory

    Perchlorate is widely used as a propellant in solid rocket fuel, and has recently been found in ground, surface, and drinking water, in many cases above the interim action level of 18 ppb. Perchlorate is recalcitrant to chemical reduction, however, studies of perchlorate in pure ...

  8. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Take any interim measures necessary to ensure the protection of human health and the environment... drinking water supplies or sensitive ecosystems; (iv) Further degradation of the ground-water that may... situations that may pose threats to human health and the environment. (b) An owner or operator may determine...

  9. 75 FR 81087 - Plum Pox Virus; Update of Quarantined Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    .... APHIS-2010-0089] Plum Pox Virus; Update of Quarantined Areas AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Interim rule and request for comments. SUMMARY: We are amending the plum pox virus.... SUPPLEMENTARY INFORMATION: Background The plum pox virus (PPV) is an extremely serious viral disease of plants...

  10. 77 FR 64564 - Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...-Basis Hurricane and Hurricane Missiles AGENCY: Nuclear Regulatory Commission. ACTION: Proposed interim...-ISG-024, ``Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles....221, ``Design-Basis Hurricane and Hurricane Missiles for Nuclear Power Plants.'' DATES: Submit...

  11. 76 FR 21615 - Nectarines and Peaches Grown in California; Suspension of Handling Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... requirements. The orders also authorize production research and marketing research and development projects, as... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Parts 916 and 917 [Doc. No. AMS-FV... Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments...

  12. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  13. 75 FR 48873 - Acquisition Regulation Rewrite

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... Acquisition Regulation (DIAR). This action revises the DIAR, 48 CFR chapter 14, but does not impose any new..., 2010. No public comments were received. DOI has concluded that the interim rule should be adopted as a... DEPARTMENT OF THE INTERIOR Office of the Secretary 48 CFR Chapter 14 RIN 1093-AA11 Acquisition...

  14. 76 FR 53813 - Dried Prunes Produced in California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 993 [Doc. No. AMS-FV-11-0068... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the assessment rate established for the Prune Marketing Committee (Committee) for the 2011-12 and subsequent crop...

  15. 76 FR 30184 - Outer Continental Shelf (OCS) Renewable Energy Program Interim Policy Leasing for Marine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management, Regulation and Enforcement [Docket..., Regulation and Enforcement (BOEMRE), Interior. ACTION: Notice of Intent (NOI) to Prepare an Environmental... technology testing facility located on the OCS, in accordance with the Department of the Interior and the...

  16. 77 FR 72683 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... marketing order now in effect, Washington sweet cherry handlers are subject to assessments. Funds to... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  17. 76 FR 16531 - Country of Origin of Textile and Apparel Products; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... RIN 1505-AB60) Country of Origin of Textile and Apparel Products; Correction AGENCIES: U.S. Customs and Border Protection, Department of Homeland Security; Department of the Treasury. ACTION: Final rule..., a document which adopted as a final rule, with some changes, interim amendments to the CBP...

  18. 76 FR 67376 - Anglers for Christ Ministries, Inc., New Beginning Ministries; Petitioners; Interpretation of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 79 [CG Docket No. 06-181; FCC 11-159] Anglers for... Standard AGENCY: Federal Communications Commission. ACTION: Interim rule. SUMMARY: In this document, the... intended by the Communications Act (Act). DATES: Effective November 1, 2011. FOR FURTHER INFORMATION...

  19. 75 FR 39632 - Regulated Navigation Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ..., Algiers Canal, New Orleans, LA; Correction ACTION: Interim rule; Correction. SUMMARY: In the Federal... Area; Gulf Intracoastal Waterway, Inner Harbor Navigation Canal, Harvey Canal, Algiers Canal, New Orleans, LA into the Code of Federal Regulations. That publication contained an error in the DATES section...

  20. 78 FR 21520 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... decreased the assessment rate established for the Washington Cherry Marketing Committee (Committee) for the...

  1. 78 FR 21518 - Apricots Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-12-0027...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The... the assessment rate established for the Washington Apricot Marketing Committee (Committee) for the...

  2. 78 FR 24333 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... York, hereinafter referred to as the ``order.'' The order is effective under the Agricultural Marketing... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as...

  3. 77 FR 39150 - Avocados Grown in South Florida; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any questions about the compliance guide... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 915 [Doc. No. AMS-FV-11-0094... Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule decreases the...

  4. 75 FR 65439 - Defense Federal Acquisition Regulation Supplement; Electronic Subcontracting Reporting System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Parts 219 and 252 [DFARS Case... System AGENCY: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Interim rule... Supplement (DFARS) to conform to the Federal Acquisition Regulation (FAR) by providing Department of Defense...

  5. 76 FR 33184 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... multiple OPs from 2001-2005. Furthermore, the USDA Food Safety and Inspection Service (FSIS) monitors meat... Food, Drug, and Cosmetic Act (FFDCA). DATES: Comments, identified by docket identification (ID) number...? You may be potentially affected by this action if you are an agricultural producer, food manufacturer...

  6. 77 FR 52595 - Cranberries Grown in States of Massachusetts, Rhode Island, Connecticut, New Jersey, Wisconsin...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 929 [Doc. No. AMS-FV-12-0002... Reporting Requirements AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule revises the reporting requirements currently prescribed under the marketing...

  7. 75 FR 39859 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 10-88] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... a summary of the Commission's Structure and Practices of the Video Relay Service Program, Order...

  8. 76 FR 47476 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... summary of the Commission's Structure and Practices of the Video Relay Service Program, Order (Order...

  9. 77 FR 33662 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 64 [CG Docket No. 10-51; FCC 11-118] Structure and Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Correcting amendments. SUMMARY: This document contains a correction to the interim regulations of the Commission's rules...

  10. 76 FR 74831 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... exposed to treated borated water. In response to a request from the Nuclear Energy Institute (NEI), the... NUCLEAR REGULATORY COMMISSION [NRC-2011-0256] Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff...

  11. 78 FR 68101 - Environmental Issues Associated With New Reactors and Specific Environmental Guidance for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... October 15, 2013. The Nuclear Energy Institute (NEI) submitted a letter on September 17, 2013 (Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With... AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; re-opening of comment period...

  12. 76 FR 69146 - Agricultural Career and Employment Grants Program; Withdrawal

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ..., Departmental Management, USDA. ACTION: Proposed rule; withdrawal. SUMMARY: On October 27, 2011, USDA submitted... Regulations section of this issue of the Federal Register, USDA is publishing the interim rule. DATES: As of..., Voice: (202) 205-4215, Fax: (202) 720-7136, Email: [email protected]usda.gov . SUPPLEMENTARY...

  13. 78 FR 62963 - Apricots Grown in Designated Counties in Washington; Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-13-0040... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY... under the Washington apricot marketing order (order) for the remainder of the 2013-2014 fiscal period...

  14. 75 FR 75884 - Regulations Regarding Income-Related Monthly Adjustment Amounts to Medicare Beneficiaries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... premiums. This new subpart implements changes made to the Social Security Act (Act) by the Affordable Care... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 418 [Docket No. SSA-2010-0029] RIN 0960-AH22... Coverage Premiums AGENCY: Social Security Administration. ACTION: Interim final rule with request for...

  15. 76 FR 80733 - Extension of Temporary Registration of Municipal Advisors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-66020; File No. S7-19-10] RIN 3235-AK69 Extension of Temporary Registration of Municipal Advisors AGENCY: Securities and Exchange Commission. ACTION: Interim final temporary rule; extension. SUMMARY: The Securities and Exchange Commission...

  16. 76 FR 56949 - Biomass Crop Assistance Program; Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    .... ACTION: Interim rule; correction. SUMMARY: The Commodity Credit Corporation (CCC) is amending the Biomass... funds in favor of the ``project area'' portion of BCAP. CCC is also correcting errors in the regulation... INFORMATION: Background CCC published a final rule on October 27, 2010 (75 FR 66202-66243) implementing BCAP...

  17. Comparisons of the tropospheric specific humidity from GPS radio occultations with ERA-Interim, NASA MERRA, and AIRS data

    NASA Astrophysics Data System (ADS)

    Vergados, Panagiotis; Mannucci, Anthony J.; Ao, Chi O.; Verkhoglyadova, Olga; Iijima, Byron

    2018-03-01

    We construct a 9-year data record (2007-2015) of the tropospheric specific humidity using Global Positioning System radio occultation (GPS RO) observations from the Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) mission. This record covers the ±40° latitude belt and includes estimates of the zonally averaged monthly mean specific humidity from 700 up to 400 hPa. It includes three major climate zones: (a) the deep tropics (±15°), (b) the trade winds belts (±15-30°), and (c) the subtropics (±30-40°). We find that the RO observations agree very well with the European Centre for Medium-Range Weather Forecasts Re-Analysis Interim (ERA-Interim), the Modern-Era Retrospective Analysis for Research and Applications (MERRA), and the Atmospheric Infrared Sounder (AIRS) by capturing similar magnitudes and patterns of variability in the monthly zonal mean specific humidity and interannual anomaly over annual and interannual timescales. The JPL and UCAR specific humidity climatologies differ by less than 15 % (depending on location and pressure level), primarily due to differences in the retrieved refractivity. In the middle-to-upper troposphere, in all climate zones, JPL is the wettest of all data sets, AIRS is the driest of all data sets, and UCAR, ERA-Interim, and MERRA are in very good agreement, lying between the JPL and AIRS climatologies. In the lower-to-middle troposphere, we present a complex behavior of discrepancies, and we speculate that this might be due to convection and entrainment. Conclusively, the RO observations could potentially be used as a climate variable, but more thorough analysis is required to assess the structural uncertainty between centers and its origin.

  18. DOUBLE TRACKS Test Site interim corrective action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarilymore » of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.« less

  19. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    NASA Astrophysics Data System (ADS)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  20. Making medical records professional(s).

    PubMed

    Mason, A

    1987-07-01

    In 1986 a joint medical records project group was set up by the Institute of Health Services Management, the Association of Health Care Information and Medical Records Officers and the NHS Training Authority, with Mr Vic Peel as chairman. The group was supported by Arthur Andersen & Co, management consultants. The following is a shortened and edited version of an interim report drafted for the group by Dr Alastair Mason. It is intended for discussion and does not yet represent the definitive views of the sponsoring bodies.

  1. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  2. Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.

    PubMed

    1983-03-07

    The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.

  3. Remedy Selection and Land Use at Federal Facilities

    EPA Pesticide Factsheets

    Analysis of approximately 98 percent of the interim and final source control Records of Decision signed at Federal Facilities on the NPL from the beginning of Superfund through August 1995. PB96-963309. EPA/540/R-96/020. August 1996

  4. 77 FR 24381 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule; reopening of comment period. SUMMARY: The Coast...

  5. 77 FR 2019 - Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/Departure, Kaunakakai Harbor, Molokai, HI

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2011-1159] RIN 1625-AA87 Security Zone; Passenger Vessel SAFARI EXPLORER Arrival/ Departure, Kaunakakai Harbor, Molokai, HI AGENCY: Coast Guard, DHS. ACTION: Temporary interim rule with request for comments. SUMMARY: The Coast...

  6. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  7. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  8. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  9. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  10. 75 FR 29183 - Office of the Chief Financial Officer; Department of Agriculture Implementation of OMB Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... participants in lower-tier covered transactions with whom I intend to do business? Subpart D--Responsibilities... exclusions from covered transactions and codifies a statutory permanent debarment provision. This action also... transactions. Finally, this interim rule implements Section 14211 of the Food, Conservation, and Energy Act of...

  11. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  12. 76 FR 8992 - National Trails System Act and Railroad Rights-of-Way

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ...] National Trails System Act and Railroad Rights-of-Way AGENCY: Surface Transportation Board, DOT. ACTION... procedures regarding the use of railroad rights-of-way for railbanking and interim trail use under the National Trails System Act (Trails Act). DATES: Comments are due by April 12, 2011; replies are due by May...

  13. 77 FR 2446 - Amendments to Regulations Regarding Eligibility for a Medicare Prescription Drug Subsidy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Administration. ACTION: Final rule. SUMMARY: This final rule adopts, without change, the interim final rule with... incorporated changes to the Medicare prescription drug coverage low-income subsidy (Extra Help) program made by..., 2011. We also revised our regulations to incorporate changes made by the Medicare Improvements for...

  14. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality Management District AGENCY... on a proposed approval of a revision to the Sacramento Metropolitan Air Quality Management District... therefore is not subject to review by the Office of Management and Budget. This action is not subject to...

  15. 77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...

  16. 46 CFR 147A.6 - Right of appeal.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Right of appeal. 147A.6 Section 147A.6 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES INTERIM REGULATIONS FOR SHIPBOARD FUMIGATION General § 147A.6 Right of appeal. Any person directly affected by a decision or action taken under...

  17. 76 FR 27848 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Adoption of interim rule as final. SUMMARY: The Department of... marketing order for Oregon-Washington pears that provides for the sale of fresh pears directly to consumers...

  18. 76 FR 4202 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY: This rule adds an exemption to the marketing order for Oregon- Washington pears that provides for the sale of fresh...

  19. 76 FR 78150 - Procedures for the Handling of Retaliation Complaints Under Section 806 of the Sarbanes-Oxley Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... of the Sarbanes-Oxley Act of 2002, as Amended; Correction AGENCY: Occupational Safety and Health Administration, Labor. ACTION: Interim final rule; correction. SUMMARY: The Occupational Safety and Health... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1980 [Docket Number...

  20. From the Bottom Up: Toward a Strategy for Income and Employment Generation among the Disadvantaged. An Interim Report.

    ERIC Educational Resources Information Center

    O'Regan, Fred; Conway, Maureen

    The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…

  1. 76 FR 60707 - Supplemental Standards for Ethical Conduct for Employees of the Department of the Treasury

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... DEPARTMENT OF THE TREASURY Office of Financial Research 12 CFR Chapter XVI RIN 1505-AC38... Financial Research, Treasury. ACTION: Interim rule. SUMMARY: The Department of the Treasury (Department... chapter in Title 12 of the Code of Federal Regulations to incorporate certain post-employment prohibitions...

  2. 76 FR 67361 - Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...

  3. 78 FR 24669 - Reorganization of Regulations on the Adjudication of Department of Homeland Security Practitioner...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF JUSTICE Executive Office for Immigration Review 8 CFR Parts 1003 and 1292 [EOIR... Immigration Review, Department of Justice. ACTION: Final rule. SUMMARY: This final rule adopts without change... interim rule amended regulations of the Executive Office for Immigration Review (EOIR) at the Department...

  4. 78 FR 21521 - Pears Grown in Oregon and Washington; Assessment Rate Decrease for Processed Pears

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-12-0031... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... Committee locally administers the marketing order that regulates the handling of processed pears grown in...

  5. Improving Student Achievement in a Multidisciplinary Context

    ERIC Educational Resources Information Center

    Chapman, Amanda; Bloxham, Sue

    2004-01-01

    This article analyses interim findings of an ongoing action research project into the use of assessment criteria and grade descriptors in the assessment process. The project is multidisciplinary and covers areas as diverse as Sports Sociology, Economics, Youth and Community Studies, and Education. The idea is to equip first-year students with the…

  6. 78 FR 56816 - Vidalia Onions Grown in Georgia; Change in Reporting and Assessment Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... the following Web site: http://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 955 [Doc. No. AMS-FV-12-0071...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The...

  7. 78 FR 24983 - Domestic Dates Produced or Packed in Riverside County, California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ...://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting Jeffrey Smutny, Marketing Order... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 987 [Docket No. AMS-FV-12-0035... Rate AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule...

  8. The Costs and Benefits of High Speed Vessels Relative to Traditional C-17 Military Airlift

    DTIC Science & Technology

    2003-12-01

    37 APPENDIX D SWOT Analysis...Port Action Officers Group IBCT Interim Brigade Combat Team LCS Littoral Combat Ship LST Landing ship tank LSV Logistics Support Vessel... SWOT Strength Weakness Opportunity Threat TACOM Tank and Automotive Command TSV Theater Support Vessel USS United States Ship USTRANSCOM

  9. 77 FR 20536 - Exemptions for Security-Based Swaps Issued by Certain Clearing Agencies

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-05

    ... Markets Trends, Division of Corporation Finance, at (202) 551-3860, U.S. Securities and Exchange... exchange trading due to individual business needs of certain users. Those users should retain the ability... Corporation Finance issued a no-action letter that addressed the availability of these interim exemptions to...

  10. 76 FR 68116 - Structure and Practices of the Video Relay Service Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Practices of the Video Relay Service Program AGENCY: Federal Communications Commission. ACTION: Interim rule... with the Commission's Structure and Practices of the Video Relay Service Program, Second Report and... announcement of the effective date of the rules. See, In the Matter of Structure and Practices of the Video...

  11. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...

  12. 76 FR 446 - Supplemental Security Income (SSI) for the Aged, Blind, and Disabled; Dedicated Accounts and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2008-0050] RIN 0960-AE59... Payments for Certain Past- Due SSI Benefits AGENCY: Social Security Administration (SSA). ACTION: Final rules. SUMMARY: These final rules adopt, with some minor changes, the interim final rules with request...

  13. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  14. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kupar, J.; Hasek, M.

    The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less

  16. Energy policy act transportation study: Interim report on natural gas flows and rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less

  17. The gap between coverage and care-what can Canadian paediatricians do about access to health services for refugee claimant children?

    PubMed

    Rink, N; Muttalib, F; Morantz, G; Chase, L; Cleveland, J; Rousseau, C; Li, P

    2017-11-01

    In June 2012, the government of Canada severely restricted the scope of the Interim Federal Health Program that had hitherto provided coverage for the health care needs of refugee claimants. The Quebec government decided to supplement coverage via the provincial health program. Despite this, we hypothesized that refugee claimant children in Montreal would continue to experience significant difficulties in accessing basic health care. (1) Report the narrative experiences of refugee claimant families who were denied health care services in Montreal following June 2012, (2) describe the predominant barriers to accessing health care services and understanding their impact using thematic analysis and (3) derive concrete recommendations for child health care providers to improve access to care for refugee claimant children. Eleven parents recruited from two sites in Montreal participated in semi-structured interviews designed to elicit a narrative account of their experiences seeking health care. Interviews were recorded, transcribed, coded using NVivo software and subjected to thematic analysis. Thematic analysis of the data revealed five themes concerning barriers to health care access: lack of continuous health coverage, health care administrators/providers' lack of understanding of Interim Federal Health Program coverage, refusal of services or fees charged, refugee claimants' lack of understanding about health care rights and services and language barriers, and four themes concerning the impact of denial of care episodes: potential for adverse health outcomes, psychological distress, financial burden and social stigma. We propose eight action points for advocacy by Canadian paediatricians to improve access to health care for refugee claimant children in their communities and institutions.

  18. Response Action Plan for the Basin F Interim Response Action Waste Pile.

    DTIC Science & Technology

    1992-10-01

    the Waste Pile via an 8-Inch diameter HDPE stand pipe. A stainless - steel submersible pump provides the lift to deliver the collected liquid 5 to the...2.1.4 Settlement Measuring System 3 Nine settlement plates were installed at the base of the Waste Pile during its construction. A 1-Inch steel pipe...PLATE STEEL CONDUIT. PIPE GS: 5219.61 GS: 5219.98 GS: 5219.56 GS: 5219.50 SPSP: 5217.87 SPSP: 5217.94 SPSP: 5218.59 THP: 5221.25 THP: 5221.41 THP

  19. 76 FR 21812 - Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (44 U.S.C. chapter 35). List of Subjects in 48 CFR Parts 209 and 252 Government procurement. Mary...-AG78 Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...). ACTION: Final rule. SUMMARY: DoD is adopting as a final rule, without change, an interim rule that...

  20. Cleanup Verification Package for the 600-47 Waste Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. J. Cutlip

    This cleanup verification package documents completion of interim remedial action for the 600-47 waste site. This site consisted of several areas of surface debris and contamination near the banks of the Columbia River across from Johnson Island. Contaminated material identified in field surveys included four areas of soil, wood, nuts, bolts, and other metal debris.

  1. 76 FR 4204 - Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West; Revision of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 985 [Docket Nos. AMS-FV-09-0082; FV10-985-1A IR] Marketing Order Regulating the Handling of Spearmint Oil Produced in the Far West...-2011 Marketing Year AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for...

  2. 76 FR 22785 - Direct Certification and Certification of Homeless, Migrant and Runaway Children for Free School...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... 1309 of the Elementary and Secondary Education Act of 1965 (ESEA). In general, a migrant child is one... Children for Free School Meals AGENCY: Food and Nutrition Service, USDA. ACTION: Interim rule with request... children's eligibility for free meals under the National School Lunch Program and the School Breakfast...

  3. 78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...

  4. 76 FR 40038 - Improving Government Regulations; Unified Agenda of Federal Regulatory and Deregulatory Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... such systems provide timely, reliable information for the management of DoD programs. This interim rule... public impact, their nature may be of public interest and, therefore, are published to provide notice of rulemaking and an opportunity for public participation in the internal DoD rulemaking process. Members of the...

  5. 76 FR 40234 - Drawbridge Operation Regulations; Harlem River, New York City, NY

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ...-AA09 Drawbridge Operation Regulations; Harlem River, New York City, NY AGENCY: Coast Guard, DHS. ACTION... at mile 0.0, across the Harlem River at New York City, New York. This interim rule is necessary to... The 103rd Street (Wards Island) Pedestrian Bridge, across the Harlem River, mile 0.0, at New York City...

  6. Draft Final Risk Assessment Lime Settling Basins. Version 2.1

    DTIC Science & Technology

    1990-10-25

    TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0

  7. 78 FR 3 - Irish Potatoes Grown in Colorado; Modification of the Handling Regulation for Area No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-02

    ... marketing agreements and orders may be viewed at: www.ams.usda.gov/MarketingOrdersSmallBusinessGuide . Any... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 948 [Doc. No. AMS-FV-12-0043... AGENCY: Agricultural Marketing Service, USDA. ACTION: Interim rule with request for comments. SUMMARY...

  8. 76 FR 60358 - Gypsy Moth Generally Infested Areas; Additions in Indiana, Maine, Ohio, Virginia, West Virginia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Virginia, and Wisconsin AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Affirmation of... amended the regulations to add areas in Indiana, Maine, Ohio, Virginia, West Virginia, and Wisconsin to..., West Virginia, and Wisconsin to the list of generally infested areas. \\1\\ To view the interim rule and...

  9. 76 FR 67385 - Claims Procedures Under the Oil Pollution Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-AA03 Claims Procedures Under the Oil Pollution Act of 1990 AGENCY: Coast Guard, DHS. ACTION: Notice of... finalize a 1992 interim rule that set forth the Oil Pollution Act of 1990 (OPA'90) claims procedures and... Pollution Funds Center, U.S. Coast Guard, telephone (202) 493-6863, email [email protected] . If you...

  10. 78 FR 57257 - Medicare Determinations and Income-Related Monthly Adjustment Amounts to Medicare Part B Premiums...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...; Conforming Changes to Regulations AGENCY: Social Security Administration. ACTION: Interim final rule with... monthly adjustment amounts (IRMAA) in order to conform to changes made to the Social Security Act (Act) by... SOCIAL SECURITY ADMINISTRATION 20 CFR Parts 404 and 418 [Docket No. SSA-2012-0011] RIN 0960-AH47...

  11. Success of the Melton Valley Watershed Remediation at the ORNL - 12351

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adler, David; Wilkerson, Laura; Sims, Lynn

    2012-07-01

    The source remediation of the Melton Valley (MV) Watershed at the U.S. Department of Energy's (DOE's) Oak Ridge National Laboratory was completed 5 years ago (September 2006). Historic operations at the laboratory had resulted in chemical and radionuclide contaminant releases and potential risks or hazards within 175 contaminated units scattered across an area of 430 hectares (1062 acres) within the watershed. Contaminated areas included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pit/trenches, hydrofracture wells, leak and spill spites, inactive surface structures, and contaminated soil and sediments. The remediation of the watershed was detailed in the MV Interim Actionmore » Record of Decision (ROD) and included a combination of actions encompassing containment, isolation, stabilization, removal, and treatment of sources within the watershed and established the monitoring and land use controls that would result in protection of human health. The actions would take place over 5 years with an expenditure of over $340 M. The MV remedial actions left hazardous wastes in-place (e.g., buried wastes beneath hydraulic isolation caps) and cleanup at levels that do not allow for unrestricted access and unlimited exposure. The cleanup with the resultant land use would result in a comprehensive monitoring plan for groundwater, surface water, and biological media, as well as the tracking of the land use controls to assure their completion. This paper includes an overview of select performance measures and monitoring results, as detailed in the annual Remediation Effectiveness Report and the Five-Year Report. (authors)« less

  12. Mobile Launch Platform Vehicle Assembly Area (SWMU 056) Biosparge Expansion Interim Measures Work Plan

    NASA Technical Reports Server (NTRS)

    Burcham, Michael S.; Daprato, Rebecca C.

    2016-01-01

    This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.

  13. Obama's Education Record

    ERIC Educational Resources Information Center

    Petrilli, Michael; Eberhardt, Tyson

    2012-01-01

    In the fourth and final year of the first term of the Obama administration, enough time has elapsed to provide an opportunity for at least an interim assessment. Senator Lamar Alexander has commented that he has "a lot of admiration" for Obama's education secretary, Arne Duncan, and "respect" for the president's "positions…

  14. Interim Reflections on the Corporate University and SME Academy Business Development Innovation and Its Diffusion

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2008-01-01

    Purpose: The purpose of this paper is to reflect on and inform about learning points from ECUANET, a two-year duration best practice action research and transnational networking project as it approaches its final stage. Design/methodology/approach: The paper explicates the key positive and obfuscating dynamics that the project team have had to,…

  15. 77 FR 4492 - Endangered and Threatened Wildlife and Plants; Reissuance of Interim Special Rule for the Polar Bear

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... order in regard to Misc. No. 08- 764 (EGS) MDL Docket No. 1993 IN RE: POLAR BEAR ENDANGERED SPECIES ACT... (Service), published a final rule listing the polar bear (Ursus maritimus) as a threatened species... Special Rule for the Polar Bear AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY...

  16. 78 FR 59791 - Annual Company-Run Stress Tests at Banking Organizations With Total Consolidated Assets of More...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Stress Tests at Banking Organizations With Total Consolidated Assets of More Than $10 Billion But Less... Stress Test Cycle AGENCY: Board of Governors of the Federal Reserve System (Board). ACTION: Interim final... framework) in their stress tests for the stress test cycle that begins October 1, 2013. For this stress test...

  17. Manifestation Determination Reviews and School Team Decision-Making with Students with Emotional/Behavioral Disabilities

    ERIC Educational Resources Information Center

    Walker, Jennifer D.

    2013-01-01

    Manifestation determination teams are required by law to determine the relationship between a student's disability and behaviors that lead to disciplinary action when a student with a disability is either excluded from school for more than 10 days, is put in an interim alternative placement, or is under consideration for a change in placement.…

  18. Turning Points: States in Action. An Interim Report of the Middle Grade School State Policy Initiative.

    ERIC Educational Resources Information Center

    Council of Chief State School Officers, Washington, DC. Resource Center on Educational Equity.

    This report analyzes the experiences of 27 states selected to participate in Carnegie Corporation of New York's Middle Grade School State Policy Initiative (MGSSPI), a 3-year grant program to states to stimulate fundamental reform in schools serving 10- to 15-year old students. MGSSPI states are working to radically transform the education…

  19. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  20. 40 CFR 265.304 - Monitoring and inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for two consecutive months, the amount of liquids in the sumps must be recorded at least quarterly. If... sump until the liquid level again stays below the pump operating level for two consecutive months. (c... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  1. 40 CFR 265.304 - Monitoring and inspection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for two consecutive months, the amount of liquids in the sumps must be recorded at least quarterly. If... sump until the liquid level again stays below the pump operating level for two consecutive months. (c... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  2. 40 CFR 265.304 - Monitoring and inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for two consecutive months, the amount of liquids in the sumps must be recorded at least quarterly. If... sump until the liquid level again stays below the pump operating level for two consecutive months. (c... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  3. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  4. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  5. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  6. 40 CFR 265.304 - Monitoring and inspection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for two consecutive months, the amount of liquids in the sumps must be recorded at least quarterly. If... sump until the liquid level again stays below the pump operating level for two consecutive months. (c... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  7. 40 CFR 265.304 - Monitoring and inspection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for two consecutive months, the amount of liquids in the sumps must be recorded at least quarterly. If... sump until the liquid level again stays below the pump operating level for two consecutive months. (c... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...

  8. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  9. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  10. 76 FR 56409 - Notice of Interim Approval

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... and Comment Forum to be held March 29, 2011, in Tallahassee, Florida. Three parties asked questions at the forum. Responses to the questions are part of the written record of the forum, and a transcript of... each year until 2015. While preference customers throughout the Southeast have long questioned the...

  11. Petrographic manual : petrographic methods of examining hardened concrete, including introduction, sample preparation, questions and suggestions, and reading list.

    DOT National Transportation Integrated Search

    1991-01-01

    This manual was undertaken to record for all persons wishing to do concrete petrography the petrographic procedures that have been found useful here at the Virginia Transportation Research Council. This interim report is made up of the introduction, ...

  12. 75 FR 64147 - Privacy Act; Implementation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... DEPARTMENT OF THE TREASURY Office of the Secretary 31 CFR Part 1 Privacy Act; Implementation... adopting, without change, an interim rule that amended its regulations on the Privacy Act of 1974, as Amended, by removing three Privacy Act systems of records from this part, revising the title of the one...

  13. 75 FR 76781 - Reports, Forms, and Record Keeping Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-09

    ...) Whether the proposed collection of information is necessary for the proper performance of the functions of... to the implementation of the intervention and after its conclusion. Interim survey waves may also be... differences between an initial baseline survey wave and a later survey wave were associated with an...

  14. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less

  15. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  16. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  17. The role and challenges of the food industry in addressing chronic disease

    PubMed Central

    2010-01-01

    Summary Increasingly, food companies play an important role in stemming the rising burden of nutrition-related chronic diseases. Concrete actions taken by these companies include global public commitments to address food reformulation, consumer information, responsible marketing, promotion of healthy lifestyles, and public-private partnerships. These actions are reviewed together with eleven specific PepsiCo goals and commitments that address products, the marketplace, and communities at large. Interim progress on these goals and commitments are discussed as well as constraints hampering faster progress. Further disease prevention depends on increasing implementation of private-public initiatives. PMID:20509876

  18. Box Model of a Series of Salt Ponds, as Applied to the Alviso Salt Pond Complex, South San Francisco Bay, California

    USGS Publications Warehouse

    Lionberger, Megan A.; Schoellhamer, David H.; Shellenbarger, Gregory; Orlando, James L.; Ganju, Neil K.

    2007-01-01

    This report documents the development and application of a box model to simulate water level, salinity, and temperature of the Alviso Salt Pond Complex in South San Francisco Bay. These ponds were purchased for restoration in 2003 and currently are managed by the U.S. Fish and Wildlife Service to maintain existing wildlife habitat and prevent a build up of salt during the development of a long-term restoration plan. The model was developed for the purpose of aiding pond managers during the current interim management period to achieve these goals. A previously developed box model of a salt pond, SPOOM, which calculates daily pond volume and salinity, was reconfigured to simulate multiple connected ponds and a temperature subroutine was added. The updated model simulates rainfall, evaporation, water flowing between the ponds and the adjacent tidal slough network, and water flowing from one pond to the next by gravity and pumps. Theoretical and measured relations between discharge and corresponding differences in water level are used to simulate most flows between ponds and between ponds and sloughs. The principle of conservation of mass is used to calculate daily pond volume and salinity. The model configuration includes management actions specified in the Interim Stewardship Plan for the ponds. The temperature subroutine calculates hourly net heat transfer to or from a pond resulting in a rise or drop in pond temperature and daily average, minimum, and maximum pond temperatures are recorded. Simulated temperature was compared with hourly measured data from pond 3 of the Napa?Sonoma Salt Pond Complex and monthly measured data from pond A14 of the Alviso Salt-Pond Complex. Comparison showed good agreement of measured and simulated pond temperature on the daily and monthly time scales.

  19. Rolling out of kangaroo mother care in secondary level facilities in Bihar-Some experiences.

    PubMed

    Neogi, Sutapa B; Chauhan, Monika; Sharma, Jyoti; Negandhi, Preeti; Sethy, Ghanshyam

    2016-01-01

    Preterm birth is one of the leading causes of under-five child deaths worldwide and in India. Kangaroo mother care (KMC) is a powerful and easy-to-use method to promote health and well-being and reduce morbidity and mortality in preterm/low birth weight (LBW) babies. As the part of the roll-out of India Newborn Action Plan interventions, we implemented KMC in select facilities with an objective to assess the responsiveness of public health system to roll out KMC. KMC intervention was implemented in two select high priority districts, Gaya and Purnea in Bihar over the duration of 8 months from August 2015 to March 2016. The implementation of intervention was phased out into; situation analysis, implementation of intervention, and interim assessment. KMC model, as envisaged keeping in mind the building blocks of health system, was established in 6 identified health-care facilities. A pretested simple checklist was used to assess the awareness, knowledge, skills, and practice of KMC during baseline situational analysis and interim assessment phases for comparison. The intervention clearly seemed to improve the awareness among auxiliary nurse midwives/nurses about KMC. Improvements were also observed in the availability of infrastructure required for KMC and support logistics like facility for manual expression of breast milk, cups/suitable devices such as paladi cups for feeding small babies and digital weighing scale. Although the recording of information regarding LBW babies and KMC practice improved, still there is scope for much improvement. There is a commitment at the national level to promote KMC in every facility. The present experience shows the possibility of rolling out KMC in secondary level facilities with support from government functionaries.

  20. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  1. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  2. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan..., SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator or the director of the State air... be operational or in effect in the analysis year, except that regulatory TCMs may not be assumed to...

  3. STS-100 MS Parazynski and Hadfield with IRED equipment in Node 1/Unity module

    NASA Image and Video Library

    2001-04-26

    ISS002-E-7013 (26 April 2001) --- Astronauts Scott E. Parazynski and Chris A. Hadfield, mission specialists, install the Interim Resistive Exercise Devise (IRED) in the Unity/Node 1. Hadfield represents the Canadian Space Agency (CSA). A digital still camera was used to record this image.

  4. Formerly Utilized Sites Remedial Action Program (FUSRAP) Hazelwood Interim Storage Site annual site environmental report. Calendar year 1985. [FUSRAP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1986-04-01

    The Hazelwood Interim Storage Site (HISS) is presently used for the storage of low-level radioactively contaminated soils. Monitoring results show that the HISS is in compliance with DOE concentration guides and radiation protection standards. Derived Concentration Guides (DCGs) represent the concentrations of radionuclides in air or water that would limit the radiation dose to 100 mrem/y. The applicable limits have been revised since the 1984 environmental monitoring report was published. The limits applied in 1984 were based on a radiation protection standard of 500 mrem/y; the limits applied for 1985 are based on a standard of 100 mrem/y. The HISSmore » is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where low-level radioactive contamination remains from the early years of the nation's atomic energy program. To determine whether the site is in compliance with DOE standards, environmental measurements are expressed as percentages of the applicable DCG, while the calculated doses to the public are expressed as percentages of the applicable radiation protection standard. The monitoring program at the HISS measures uranium, radium, and thorium concentrations in surface water, groundwater, and sediment; radon gas concentrations in air; and external gamma radiation exposure rates. Potential radiation doses to the public are also calculated. The HISS was designated for remedial action under FUSRAP because radioactivity above applicable limits was found to exist at the site and its vicinity. Elevated levels of radiation still exist in areas where remedial action has not yet been completed.« less

  5. Superfund Record of Decision (EPA Region 5): New Brighton/Arden Hills (TCAAP), Twin Cities Army Ammunition Plant, MN. (Seventh remedial action), August 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-08-11

    The New Brighton/Arden Hills site, also known as the Twin Cities Army Ammunition Plant (TCAAP) site, is in New Brighton, Minnesota. Past disposal of ammunition manufacturing wastes onsite resulted in contamination of ground water beneath and downgradient of the site. A total of 14 waste-disposal locations have been identified and assigned as Sites A through K. During remedial investigations at Site D, soil was discovered to be contaminated with PCBs and other organic and metal contaminants. A soil-gas extraction system was implemented to remove the source of volatile organic contamination and reduce the potential of migration to ground water. Inmore » implementing the soil gas extraction system, PCB-contaminated soil was removed, stockpiled near Site D, and sealed with a plastic-liner material. The interim remedy addresses the treatment and disposal of contaminated soil that is stockpiled near Site D. The primary contaminants of concern affecting the soil are VOCs including TCE and PCE, other organics including PCBs, and metals including arsenic and lead.« less

  6. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  7. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri. [Hazelwood Interim Storage Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  8. Israel: Background and U.S. Relations in Brief

    DTIC Science & Technology

    2017-01-06

    future Israeli-Palestinian negotiations by Secretary of State John Kerry on December 28, 2016, and other statements and actions related to issues of...Interim Agreement; permanent status to be determined through further negotiation . The status of the Gaza Strip is a final status issue to be resolved...through negotiations . Israel proclaimed Jerusalem as its capital in 1950, but the United States, like nearly all other countries, retains its embassy in

  9. 40 CFR 93.119 - Criteria and procedures: Interim emissions in areas without motor vehicle emissions budgets.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... applies to the net effect of the action (transportation plan, TIP, or project not from a conforming plan... notified the MPO and DOT; and (10) VOC, SO2 and/or ammonia in PM2.5 areas if the EPA Regional Administrator... effect in the analysis year, except that regulatory TCMs may not be assumed to begin at a future time...

  10. Hydrazine Blending and Storage Facility, Interim Response Action Implementation. Final Safety Plan

    DTIC Science & Technology

    1989-08-30

    operators and visitors, will be required to wear a personal hydrazine dosimeter at all times. These will be available from commercial sources and/or the Naval...suspectea or carcinogenic pocen:tal for =an. -- t, :t ha a,,-cn OSL ?:L. Is I pPm or 1.3 mg/m 3 . zo pp=n4p"NIOSI. (1978) hs a oe -nded a ceiling level

  11. Data breaches. Final rule.

    PubMed

    2008-04-11

    This document adopts, without change, the interim final rule that was published in the Federal Register on June 22, 2007, addressing data breaches of sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). This final rule implements certain provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006. The regulations prescribe the mechanisms for taking action in response to a data breach of sensitive personal information.

  12. THE PROGRAM FOR BRAIN INJURED CHILDREN IN THE NEW YORK CITY PUBLIC SCHOOLS, AN APPRAISAL.

    ERIC Educational Resources Information Center

    MOSKOWITZ, SUE

    IN 1959, THE TWO EXISTING SPECIAL CLASSES FOR BRAIN INJURED CHILDREN IN NEW YORK CITY WERE EVALUATED BY OBSERVATIONS, EXAMINATION OF THE STUDENTS' MEDICAL AND EDUCATIONAL RECORDS, AND INTERVIEWS WITH TEACHERS, PSYCHOLOGISTS, PSYCHIATRISTS, AND SPEECH AND OTHER SPECIALISTS. RECOMMENDATIONS WERE MADE IN AN INTERIM REPORT. A LONGITUDINAL STUDY WAS…

  13. An Information Storage and Retrieval System for Biological and Geological Data. Interim Report.

    ERIC Educational Resources Information Center

    Squires, Donald F.

    A project is being conducted to test the feasibility of an information storage and retrieval system for museum specimen data, particularly for natural history museums. A pilot data processing system has been developed, with the specimen records from the national collections of birds, marine crustaceans, and rocks used as sample data. The research…

  14. 78 FR 78819 - National Conference on Weights and Measures 99th Interim Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-27

    ... 44: General Code Item 310-2 G.S.5.6. Recorded Representations. A variety of commercial weighing and... protections for buyers and sellers alike. This item is a proposal to revise the General Code requirement to... high-precision balances that are typically used by precious metal and gem buyers have built balances...

  15. Investigations of the role of physical-transport processes in determing ichthyoplankton distributions in the Potomac River. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Polgar, T.T.; Ulanowicz, R.E.; Pyne, D.A.

    1975-09-01

    This report presents in-depth analyses of current meter records obtained from the deployment of continuously recording current meters in the Potomac estuary in 1974. The analyses of transport characteristics are presented in relation to the distribution of striped bass ichthyoplankton in the tidal portion of the Potomac River. The characteristics of ichthyoplankton distributions are described in terms of longitudinal, lateral, and time patterns of abundances. Estimates are made of the production and survival of various ichthyoplankton stages.

  16. Current good manufacturing practices, quality control procedures, quality factors, notification requirements, and records and reports, for infant formula. Final rule.

    PubMed

    2014-06-10

    The Food and Drug Administration (FDA or we) is issuing a final rule that adopts, with some modifications, the interim final rule (IFR) entitled "Current Good Manufacturing Practices, Quality Control Procedures, Quality Factors, Notification Requirements, and Records and Reports, for Infant Formula'' (February 10, 2014). This final rule affirms the IFR's changes to FDA's regulations and provides additional modifications and clarifications. The final rule also responds to certain comments submitted in response to the request for comments in the IFR.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benioff, R.; Ness, E.; Hirst, J.

    Under its Support for National Action Plans (SNAP) initiative, the U.S. Country Studies Program is providing financial and technical assistance to 18 countries for the development of climate change action plans. Although most of the countries have not yet completed their plans, the important lessons learned thus far are valuable and should be shared with other countries and international institutions that have an interest in the process of action plan development. This interim report describes the experience of 11 countries that are the furthest along in their planning activity and who have offered to share their results to date withmore » the larger community of interested nations. These action plans delineate specific mitigation and adaptation measures that the countries will implement and integrate into their ongoing development programs. This report focuses on the measures the countries have selected and the methods they used to prepare their action plans. This executive summary presents key lessons and common themes using a structure similar to that used in the individual country chapters.« less

  18. ORNL Remedial Action Program strategy (FY 1987-FY 1992)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trabalka, J.R.; Myrick, T.E.

    1987-12-01

    Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less

  19. Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

    DTIC Science & Technology

    1982-06-01

    these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase

  20. JPRS Report, Near East & South Asia, Pakistan

    DTIC Science & Technology

    1992-06-11

    of emotion , and, at the end of the 14-year crisis in Afghanistan, form an interim council government of the mujaheddin; and, with unanimous...masses of Afghanistan came to our country, they were accompanied by their criminal, terrorist, antisocial , and enemy agents. There was no way for us to...Sindh is the irresponsible behaviour , incompetence and lack of action by the police. Had it not been for the police department’s failure to carry

  1. Disclosure of information to organ, tissue and eye procurement organizations. Final rule.

    PubMed

    2008-11-03

    This document adopts, with changes, a Department of Veterans Affairs (VA) interim final rule that implemented provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006 concerning disclosure of information to organ, tissue and eye procurement organizations. The regulation will provide authority for VA to provide individually-identifiable VA medical records of veterans or dependents of veterans who are deceased or whose death is imminent to representatives of organ procurement organizations, eye banks, and tissue banks to determine whether the patients are suitable potential donors. This document modifies the interim final rule to clarify the definition of "near death" and to correct a grammatical error in the definition of "procurement organization." This document also clarifies that eye bank and tissue bank registration with FDA must have an active status.

  2. Remote Sensing the Thermal and Humidity Structure of the Earth's Atmosphere Using the GPS Radio Occultation Technique: Applications in Climate Studies

    NASA Astrophysics Data System (ADS)

    Vergados, P.; Mannucci, A. J.; Ao, C. O.; Verkhoglyadova, O. P.; Iijima, B.

    2017-12-01

    This presentation introduces the fundamentals of the Global Positioning System radio occultation (GPS RO) remote sensing technique in retrieving atmospheric temperature and humidity information and presents the use of these observations in climate research. Our objective is to demonstrate and establish the GPS RO remote sensing technique as a complementary data set to existing state-of-the-art space-based platforms for climate studies. We show how GPS RO measurements at 1.2-1.6 GHz frequency band can be used to infer the upper tropospheric water vapor and temperature feedbacks and we present a decade-long specific humidity (SH) record from January 2007 until December 2015. We cross-compare the GPS RO-estimated climate feedbacks and the SH long-record with independent data sets from the Modern-Era Retrospective Analysis for Research and Applications (MERRA), the European Center for Medium-range Weather Forecasts Re-Analysis Interim (ERA-Interim), and the Atmospheric Infrared Sounder (AIRS) instrument. These cross-comparisons serve as a performance guide for the GPS-RO observations with respect to other data sets by providing an independent measure of climate feedbacks and humidity short-term trends.

  3. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  4. Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This final status report describes the actions taken by NASA in response to the recommendations of the Presidential Commission on the Space Shuttle Challenger Accident (Mission 51-L). The Commission recommendations and NASA's responses to them are summarized in the Executive Summary, which is accompanied by a schedule showing significant program milestones. A detailed discussion of the activities undertaken by NASA to implement each of the nine Commission recommendations is included and other related NASA actions required for safe return to flight are discussed. A copy of the interim plan submitted to the President one year ago and other significant reference documents are included as appendixes.

  5. Considerations Taken in Developing the Frequency Assignment Guidelines for Communications in the Mars Region Provided in SFCG Recommendation 22-1, (SFCG Action Item No. 23/10)

    NASA Technical Reports Server (NTRS)

    Wang, Charles C.; Peng, Ted; Sue, Miles K.

    2004-01-01

    In the 23'd Annual SFCG meeting in San Diego, CA, the SFCG created SFCG Action Item No. 23/10 to provide a readable summary of the work done by the Mars Interim Working Group (MIWG). The SFCG created the MIWG to develop a frequency plan for future Mars missions. The working group has produced a number of documents resulting in a recommendation, SFCG Rec 22-1 [1], titled Frequency Assignment Guidelines for Communications in Mars Region, including a frequency plan for the Mars Region. This document is prepared in response to the SFCG Action Item to provide an overview of the considerations taken when selecting the frequencies and to point out where detailed information of the considerations can be found.

  6. Development of a probabilistic PCB-bioaccumulation model for six fish species in the Hudson River

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stackelberg, K. von; Menzie, C.

    1995-12-31

    In 1984 the US Environmental Protection Agency (USEPA) completed a Feasibility Study on the Hudson River that investigated remedial alternatives and issued a Record of Decision (ROD) later that year. In December 1989 USEPA decided to reassess the No Action decision for Hudson River sediments. This reassessment consists of three phases: Interim Characterization and Evaluation (Phase 1); Further Site Characterization and Analysis (Phase 2); and, Feasibility study (Phase 3). A Phase 1 report was completed in August, 1991. The team then completed a Final Work Plan for Phase 2 in September 1992. This work plan identified various PCB fate andmore » transport modeling activities to support the Hudson River PCB Reassessment Remedial Investigation and Feasibility Study (RI/FS). This talk provides a description of the development of a Probabilistic bioaccumulation models to describe the uptake of PCBs on a congener-specific basis in six fish species. The authors have developed a framework for relating body burdens of PCBs in fish to exposure concentrations in Hudson River water and sediments. This framework is used to understand historical and current relationships as well as to predict fish body burdens for future conditions under specific remediation and no action scenarios. The framework incorporates a probabilistic approach to predict distributions in PCB body burdens for selected fish species. These models can predict single population statistics such as the average expected values of PCBs under specific scenarios as well as the distribution of expected concentrations.« less

  7. Remedial Investigation/Feasibility Study/Interim Response Actions

    DTIC Science & Technology

    1988-03-25

    organosulfur compounds (CC/FP), organophosphorus compounds (CC/FPD), hydrocarbons (CC/FID), volatile aromatic compounds (GC/ PID ), volatile halogenated...ICP metals, mercury and arsenic (AA). Water samples are being analyzed for volatile halogenated organics (GC/CON), volatile aromatic organics (GC/ PID ...Feb Mar Apr May Jun Jul Aug SepSI - I I I I I • .. I I I ----+----- 685 27-90 so ONSITE DISPOSAL FACILITY .i * 686 27-01 Prep FLUE Plan Fz=m8u> 6e7

  8. Preliminary Engineering Design Package for the Basin A Neck Groundwater Intercept and Treatment System Interim Response Action

    DTIC Science & Technology

    1989-02-01

    INDICATOR pPOST-FILTERED VITER RPUESIC POST-FILTRATION POLYMER SOLUTION MCUUM BREAKER FILTRATION POLYMER D*+RENTALkL PRESSURE SWITCH FEED PUMPS POLYMER...differential pressure switch signals the need for backwash of the operating filter. At this time, flow is S automatically switched to the standby filter...filter is undergoing backwash or on standby. High differential pressure across the filter bed, as sensed by a differential pressure switch , signals

  9. Offpost Interim Response Action, Alternatives Assessment, Version 2.3

    DTIC Science & Technology

    1988-12-01

    copper resulting from the use as algicides or herbicides of basic copper carbonate (molachite), copper sulfate (see below), copper monoethandime, and...mart per million for potable water for residues of -copper resulting from the use as algicides or herbicides of basic copper sulfat. and the other...Water ARAR: 21 C.F.R. § 193.90 (TPFA) -- tolerance of 1 part per million for potable water for residues of copper resulting from the use as algicides or

  10. Rocky Mountain Arsenal, Sanitary Sewer Interim Response Action, Construction Documents for New Sanitary Sewer Construction. Volume 2

    DTIC Science & Technology

    1990-05-01

    curves ; test reports; test cylinders: samples, O&M manuals including parts lists; certifications; warranties and other such required submittals...purpose. 14.4.3. Authority and responsibilities of all quality control personnel. 14.4.4. Schedule of Use of inspection personnel by types and phase of...quality control program shall include four phases of inspection and tests. The Contracting Officer’s representative shall be notified at least 24

  11. Wayne Interim Storage Site environmental report for calendar year 1992, 868 Black Oak Ridge Road, Wayne, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Wayne Interim Storage Site (WISS) and provides the results for 1992. The fenced, site, 32 km (20 mi) northwest of Newark, New Jersey, was used between 1948 and 1971 for commercial processing of monazite sand to separate natural radioisotopes - predominantly thorium. Environmental surveillance of WISS began in 1984 in accordance with Department of Energy (DOE) Order 5400.1 when Congress added the site to DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). The environmental surveillance program at WISS includes sampling networks for radon and thoron in air; external gamma radiation exposure;more » radium-226, radium-228, thorium-230, thorium-232, total uranium, and several chemicals in surface water and sediment; and total uranium, radium-226, radium-228, thorium-230, thorium-232, and organic and inorganic chemicals in groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. This monitoring program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results for environmental surveillance in 1992 show that the concentrations of all radioactive and most chemical contaminants were below applicable standards.« less

  12. Coverage of Certain Preventive Services Under the Affordable Care Act. Final rules.

    PubMed

    2015-07-14

    This document contains final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. These regulations finalize provisions from three rulemaking actions: Interim final regulations issued in July 2010 related to coverage of preventive services, interim final regulations issued in August 2014 related to the process an eligible organization uses to provide notice of its religious objection to the coverage of contraceptive services, and proposed regulations issued in August 2014 related to the definition of "eligible organization,'' which would expand the set of entities that may avail themselves of an accommodation with respect to the coverage of contraceptive services.

  13. Microelectronics Reliability

    DTIC Science & Technology

    2017-01-17

    2016-0155 Kirtland AFB, NM 87117-5776 9. SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) AFRL /RVSW 11...22060-6218 1 cy AFRL /RVIL Kirtland AFB, NM 87117-5776 2 cys Official Record Copy AFRL /RVSW/Clay Mayberry 1 cy Approved for... AFRL -RV-PS- AFRL -RV-PS- TR-2016-0155 TR-2016-0155 MICROELECTRONICS RELIABILITY Clay Mayberry and Joseph Bernstein 17 Jan 2017 Interim Report

  14. Development of the Smart Weapons Operability Enhancement Interim Thermal Model

    DTIC Science & Technology

    1991-03-11

    Absorptivity HFOL Vegetation Height (cm) (b.) hiveg.inp High Vegetation Parameters for VEGGIE 0.70 1.0 0.85 0.96 50.00 (c.) mnedveg.inp Medium Vegetation...Parameters for VEGGIE 0.40 1.0 0.85 0.96 100.00 (d.) grass.inp Grassland Parameters for VEGGIE 0.50 1.0 0.98 0.80 50.00 66 Table B-8. Input Records in

  15. SILVAH 5.1: developing interim guidelines for managing oak in Pennsylvania through multi-agency cooperation

    Treesearch

    Patrick Brose; Susan Stout; Gary Miller; Kurt Gottschalk

    2003-01-01

    The SILVAH decision-support system developed by numerous researchers at the Forestry Sciences Lab in Irvine, PA, has a proven track record for prescribing appropriate silvicultural treatments for the cherry-maple and northern hardwood forests of the Allegheny Plateau region. However, it has had only limited usage in mixed-oak forests of the same region and virtually no...

  16. Operable Unit B1 Interim Record of Decision. Installation Restoration Program (IRP)

    DTIC Science & Technology

    1993-07-28

    Geology ..................................... I-1 2.0 SITE HISTORY AND ENFORCEMENT ACTIVITIES ........... 11-5 2.1 Background on Contamination Problems at...McClellan AFB OU BI . 11-5 2.2 Previous Studies ................................ 11-5 2.3 Regulatory and Enforcement History .................... 11-7...1-4 2-1 History of OU BI ...................................... 11-6 4-1 Cross-Section A-A’ of OU B.I

  17. Risk Assessment Approach for the Hanford Site River Corridor Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomson, J.E.; Weiss, S.G.; Sands, J.P.

    2007-07-01

    The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less

  18. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less

  19. 76 FR 1603 - Agency Information Collection Activities: Proposed Collection, Comment Request: Reporting of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ...The Commodity Futures Trading Commission (``Commission'' or ``CFTC'') is announcing an opportunity for public comment on the proposed collection of certain information by the agency. Under the Paperwork Reduction Act (``PRA''), 44 U.S.C. 3501 et seq., Federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information and to allow 60 days for public comment. The Commission recently adopted an interim final rule, as required by the Wall Street Reform and Consumer Protection Act (``Dodd-Frank Act''), requiring counterparties to a pre-enactment unexpired swap to report such swaps according to such rules as the Commission may in the future adopt. This notice solicits comments on the record retention requirement that is embedded in the interim final rule's reporting requirement, which was recognized by the Commission in an interpretive note to the final rule.

  20. 75 FR 2013 - Health Information Technology: Initial Set of Standards, Implementation Specifications, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ...The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  1. Petition to request an exemption from 100 percent identity testing of dietary ingredients: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Interim final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.

  2. Supporting Private Sector Decision-Making with NOAA's Interim Climate Data Records (ICDRs)

    NASA Astrophysics Data System (ADS)

    Privette, J. L.; Glance, W. J.; Cecil, D.; Bates, J. J.

    2012-12-01

    NOAA initiated its Climate Data Record Program (CDRP) in 2009 to operationally provide authoritative satellite Climate Data Records (CDRs) to the government and the private sector. The CDRs are based primarily on 35+ years of meteorological satellite and in situ data collected by NOAA and the Department of Defense. To date, the Program has transitioned 14 CDRs from research to initial operations. In the past year, the CDRP developed and implemented a framework to continuously extend historical CDRs using Interim Climate Data Records (ICDRs). ICDRs are "first batch" CDRs generated within several days of observation using official CDR algorithms and processes. ICDRs are required by decision support systems and other near-term applications which need current data that are fully consistent with homogeneous historical records. For example, an electrical power utility may need temperature and precipitation ICDRs to optimally identify, in both time and space, the "nearest" historical analog period to recent weather. The utility could then use the contemporaneous business data from that period to inform current decision-making. In addition to their homogeneity and consistency, ICDRs are more complete than operational weather products since ICDR processing can await upstream data delays that can negate data value for weather forecasting. However, the operational nature of ICDRs means their uncertainties typically can be improved through reprocessing once better sensor calibration and characterization data become available. Therefore, ICDRs may be considered valuable but temporary placeholders. However, the "trigger" for electing to update a given record involves many considerations, including cost, latency, downstream dependencies and scientific significance. This presentation provides an update on NOAA's CDR Program, focusing on the new CDRs transitioned to operations in 2012 and the ICDR framework -- including update decision criteria -- used to extend CDRs and meet the needs of near-term applications as well as climate monitoring and indicators activities.

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  4. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  5. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  6. Reinforcement of a PMMA resin for interim fixed prostheses with silica nanoparticles.

    PubMed

    Topouzi, Marianthi; Kontonasaki, Eleana; Bikiaris, Dimitrios; Papadopoulou, Lambrini; Paraskevopoulos, Konstantinos M; Koidis, Petros

    2017-05-01

    Fractures in long span provisional/interim restorations are a common complication. Adequate fracture toughness is necessary to resist occlusal forces and crack propagation, so these restorations should be constructed with materials of improved mechanical properties. The aim of this study was to investigate the possible reinforcement of neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles in a PMMA resin for fixed interim restorations. Composite PMMA-Silica nanoparticles powders were mixed with PMMA liquid and compact bar shaped specimens were fabricated according to the British standard BS EN ISO 127337:2005. The single-edge notched method was used to evaluate fracture toughness (three-point bending test), while the dynamic thermomechanical properties (Storage Modulus, Loss Modulus, tanδ) of a series of nanocomposites with different amounts of nanoparticles (0.25%, 0.50%, 0.75%, 1% w.t.) were evaluated. Statistical analysis was performed and the statistically significant level was set to p<0.05. The fracture toughness of all experimental composites was remarkably higher compared to control. There was a tendency to decrease of fracture toughness, by increasing the concentration of the filler. No statistically significant differences were detected among the modified/unmodified silica nanoparticles. Dynamic mechanical properties were also affected. By increasing the silica nanoparticles content an increase in Storage Modulus was recorded, while Glass Transition Temperature was shifted at higher temperatures. Under the limitations of this in-vitro study, it can be suggested that both neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles, especially at low concentrations, may enhance the overall performance of fixed interim prostheses, as can effectively increase the fracture toughness, the elastic modulus and the Glass Transition Temperature of PMMA resins used in fixed provisional restorations. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Interim Policy on Stack Height Regulatory Actions

    EPA Pesticide Factsheets

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  8. Implementation Document for Other Contamination Sources Interim Response Action shell Section 36 Trenches, RMA. Volume 1. General

    DTIC Science & Technology

    1990-12-01

    rights and obligations of theA Army as L.aaa Aqency-or Shall as Leand Party under any law or the Federai. Fact..ity (g) Unless otherwise provided in a...Exposure occurs principally during manufacture or during bulk handling activities. Since it is generally injected into the soil at depths of 15 to 30 cm...Slurry Mix Design: The design of the IMPERMIX grouting mix, which shall meet all requirements of the Impermix manufacturer . G. Quality Control Testing

  9. IRIS thermal balance test within ESTEC LSS

    NASA Technical Reports Server (NTRS)

    Messidoro, Piero; Ballesio, Marino; Vessaz, J. P.

    1988-01-01

    The Italian Research Interim Stage (IRIS) thermal balance test was successfully performed in the ESTEC Large Space Simulator (LSS) to qualify the thermal design and to validate the thermal mathematical model. Characteristics of the test were the complexity of the set-up required to simulate the Shuttle cargo bay and allowing IRIS mechanism actioning and operation for the first time in the new LSS facility. Details of the test are presented, and test results for IRIS and the LSS facility are described.

  10. Desert Shield and Desert Storm Emerging Observations

    DTIC Science & Technology

    1991-10-07

    harsh elements. d. Recommended actions. (1) Relocate APU to bustle rack on turret as an interim solution. (2) Development of an under armor APU. e...statement has been written that states an under armor APU Lu needed for the current NMT. (1) Textron Lycominq has developed an under armor APU as part...FPR OFFICiIA 0M FOR OFFICIAL Uf[ ONf.Y c. Losson(s) Learned. (1) Acquisition of a mobile, survivable rearm vehicle is required to provide an " under

  11. Implementation and adoption of nationwide electronic health records in secondary care in England: qualitative analysis of interim results from a prospective national evaluation

    PubMed Central

    Robertson, Ann; Cresswell, Kathrin; Takian, Amirhossein; Petrakaki, Dimitra; Crowe, Sarah; Cornford, Tony; Barber, Nicholas; Avery, Anthony; Fernando, Bernard; Jacklin, Ann; Prescott, Robin; Klecun, Ela; Paton, James; Lichtner, Valentina; Quinn, Casey; Ali, Maryam; Morrison, Zoe; Jani, Yogini; Waring, Justin; Marsden, Kate

    2010-01-01

    Objectives To describe and evaluate the implementation and adoption of detailed electronic health records in secondary care in England and thereby provide early feedback for the ongoing local and national rollout of the NHS Care Records Service. Design A mixed methods, longitudinal, multisite, socio-technical case study. Setting Five NHS acute hospital and mental health trusts that have been the focus of early implementation efforts and at which interim data collection and analysis are complete. Data sources and analysis Dataset for the evaluation consists of semi-structured interviews, documents and field notes, observations, and quantitative data. Qualitative data were analysed thematically with a socio-technical coding matrix, combined with additional themes that emerged from the data. Main results Hospital electronic health record applications are being developed and implemented far more slowly than was originally envisioned; the top-down, standardised approach has needed to evolve to admit more variation and greater local choice, which hospital trusts want in order to support local activity. Despite considerable delays and frustrations, support for electronic health records remains strong, including from NHS clinicians. Political and financial factors are now perceived to threaten nationwide implementation of electronic health records. Interviewees identified a range of consequences of long term, centrally negotiated contracts to deliver the NHS Care Records Service in secondary care, particularly as NHS trusts themselves are not party to these contracts. These include convoluted communication channels between different stakeholders, unrealistic deployment timelines, delays, and applications that could not quickly respond to changing national and local NHS priorities. Our data suggest support for a “middle-out” approach to implementing hospital electronic health records, combining government direction with increased local autonomy, and for restricting detailed electronic health record sharing to local health communities. Conclusions Experiences from the early implementation sites, which have received considerable attention, financial investment and support, indicate that delivering improved healthcare through nationwide electronic health records will be a long, complex, and iterative process requiring flexibility and local adaptability both with respect to the systems and the implementation strategy. The more tailored, responsive approach that is emerging is becoming better aligned with NHS organisations’ perceived needs and is, if pursued, likely to deliver clinically useful electronic health record systems. PMID:20813822

  12. The small-scale treatability study sample exemption

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coalgate, J.

    1991-01-01

    In 1981, the Environmental Protection Agency (EPA) issued an interim final rule that conditionally exempted waste samples collected solely for the purpose of monitoring or testing to determine their characteristics or composition'' from RCRA Subtitle C hazardous waste regulations. This exemption (40 CFR 261.4(d)) apples to the transportation of samples between the generator and testing laboratory, temporary storage of samples at the laboratory prior to and following testing, and storage at a laboratory for specific purposes such as an enforcement action. However, the exclusion did not include large-scale samples used in treatability studies or other testing at pilot plants ormore » other experimental facilities. As a result of comments received by the EPA subsequent to the issuance of the interim final rule, the EPA reopened the comment period on the interim final rule on September 18, 1987, and specifically requested comments on whether or not the sample exclusion should be expanded to include waste samples used in small-scale treatability studies. Almost all responders commented favorably on such a proposal. As a result, the EPA issued a final rule (53 FR 27290, July 19, 1988) conditionally exempting waste samples used in small-scale treatability studies from full regulation under Subtitle C of RCRA. The question of whether or not to extend the exclusion to larger scale as proposed by the Hazardous Waste Treatment Council was deferred until a later date. This information Brief summarizes the requirements of the small-scale treatability exemption.« less

  13. Colonie Interim Storage Site environmental report for calendar year 1992, 1130 Central Avenue, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Colonie Interim Storage Site (CISS) and provides the results for 1992. The site is located in eastern New York State, approximately 6.4 km (4.0 mi) northwest of downtown Albany. From 1958 to 1984, National Lead (NL) Industries used the facility to manufacture various components from depleted and enriched uranium natural thorium. Environmental monitoring of CISS began in 1984 when Congress added, the site to the US Department of Energy`s (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a program established to identify and decontaminate or otherwise control sites wheremore » residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental surveillance program at CISS includes sampling networks for external gamma radiation exposure and for thorium-232 and total uranium concentrations in surface water, sediment, and groundwater. Several chemical parameters are also measured in groundwater, including total metals, volatile organics, and water quality parameters. This surveillance program assists in fulfilling the DOE policy of measuring and monitoring effluents from DOE activities and calculating hypothetical doses. Results are compared with applicable Environmental Protection Agency (EPA) and New York State Department of Environmental Conservation (NYSDEC) standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements.« less

  14. Evaluation of heat conduction in dental implants after exposure to hot beverages.

    PubMed

    Livne, Shiri; Harel, Noga; Piek, Dana; Ormianer, Zeev

    2014-03-01

    It is unknown if the consumption of hot beverages after implant placement poses a danger of overheating at the bone-implant interface. The purpose of this study was to investigate the effect of simulated consumption of hot beverages on the heat transfer to different dental implant types, implant sizes, and the presence of an interim restoration. A model that consisted of 2 plastic containers was constructed to simulate the oral cavity and endosseous region of the jaw. One-piece and 2-piece implants with abutments were placed into a block of bovine mandibular bone without any healing tissue, surrounded by water maintained at 37°C in the lower compartment. The abutments, which extended into the upper container, were covered with water heated to 60°C to simulate consumption of a hot substance and then were cooled down spontaneously to 37°C during 100 to 600 seconds. Five thermocouple electrodes with an accuracy of ±0.1°C were attached to each test specimen and to a computer with data recording and analysis software to record temperature changes. Repeated measures ANOVA (α=.05)was performed to determine the effect of each major factor. Heat conduction from the abutment exposed to hot liquid was significantly higher in the cervical as opposed to the apical areas of the implants. Implant type (1 piece), diameter (wider), and the absence of an interim coping had a significant effect on the maximum temperature measured and on the temperature change rate. Abutment exposure to hot liquids resulted in heat conduction to the cervical region of the implant, which could be biologically harmful in healing tissues. Heat conduction was mitigated by implant design and diameter, and by the presence of an interim prosthesis. Results may differ in clinical models. Copyright © 2014 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  15. THE VALUE OF THE CLASSICS AS AN ELECTIVE IN COLLEGE COURSES FOR THE ENGLISH MAJOR WHO INTENDS TO TEACH IN HIGH SCHOOL. INTERIM REPORT.

    ERIC Educational Resources Information Center

    WOLFF, JOSEPH

    TO ESTABLISH WHETHER OR NOT COURSES IN THE CLASSICS AID SIGNIFICANTLY IN THE PREPARATION OF HIGH SCHOOL ENGLISH TEACHERS, THE GRADUATE RECORD EXAMINATION ADVANCED TEST ON LITERATURE (GRE) SCORES OF 11 SENIORS WHO HAD TAKEN AT LEAST ONE OF TWO CLASSICS COURSES, AT LOYOLA UNIVERSITY, ON THE THEATRE AND THE EPIC WERE COMPARED WITH THE SCORES OF…

  16. Tank waste remediation system baseline tank waste inventory estimates for fiscal year 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shelton, L.W., Westinghouse Hanford

    1996-12-06

    A set of tank-by-tank waste inventories is derived from historical waste models, flowsheet records, and analytical data to support the Tank Waste Remediation System flowsheet and retrieval sequence studies. Enabling assumptions and methodologies used to develop the inventories are discussed. These provisional inventories conform to previously established baseline inventories and are meant to serve as an interim basis until standardized inventory estimates are made available.

  17. Demonstration/Validation of the Snap Sampler Passive Groundwater Sampling Device at the Former McClellan Air Force Base

    DTIC Science & Technology

    2011-02-01

    and Development Center Fe Iron gpd Gallons per Day HDPE High Density Polyethylene Hg Mercury ICP Inductively Coupled Plasma ICP/MS...Inductively Coupled Plasma Mass Spectrometry IROD Interim Record of Decision ITRC Interstate Technology and Regulatory Council K Potassium Kow...alkaline earth metals, alkali metals, and a metalloid, were sampled. This particular demonstration took place at the McClellan Air Force Base (AFB) in

  18. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  19. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  20. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  1. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  2. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  3. Report of the Tape Recorder Action Plan Committee, 21 March 1972

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A NASA/AF Tape Recorder Action Plan Committee was formed in January 1972 to investigate tape recorder problems and to recommend an action plan to NASA management. The committee collected data on tape recorder failure history, pinpointed problem areas, discussed needed technical and management changes, and proposed an action plan for the recommended approaches.

  4. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  5. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  6. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  7. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  8. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  9. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  10. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  11. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  12. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  13. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  14. Final Decision Document for the Basin a Neck Groundwater Intercept and Treatment System Interim Response Action at the Rocky Mountain Arsenal.

    DTIC Science & Technology

    1989-02-01

    PLAN A Health and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan...Bicycloheptadiene BCHPD 0(2) Bromoform CHBR3 100(4) note: total trihalomethanes Cadmium CD 10(1) 5(3)* 10(4) I Carbon tetrachloride CCL4 0(3) 5(4) Chlordane CLDAN...comments, numerous carcinogenicity tests in a variety of animals indicate that aldrin and dieldrin promote only liver tumors and the tumors develop only

  15. Draft Final Decision Document for the North Boundary System Improvements Interim Response Action at the Rocky Mountain Arsenal

    DTIC Science & Technology

    1989-04-01

    and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of

  16. Gas-liquid chromatographic method for determining ethylenethiourea in potatoes, spinach, applesauce, and milk: collaborative study.

    PubMed

    Onley, H H

    1977-09-01

    Eight laboratories collaboratively tested a gas-liquid chromatographic method for determining ethylenetiourea (ETU) in potatoes, spinach, applesauce, and milk. In the determinative step, ETU is converted to the S-butyl derivative (2-n-butylmercapto-2-imidazoline) which is detected by a flame photometric detector, sulfur mode. For unknown fortification levels of 0.06, 0.12, and 0.30 ppm, the collaborators reported an overall average recovery range of 85-97% in the various commodities. The method has been adopted as interim official first action.

  17. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  18. 48 CFR 1450.101-3 - Records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Records. 1450.101-3... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.101-3 Records. The records of actions taken under FAR Part 50 shall be maintained by the Director, PAM. ...

  19. 48 CFR 1450.101-3 - Records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Records. 1450.101-3... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.101-3 Records. The records of actions taken under FAR Part 50 shall be maintained by the Director, PAM. ...

  20. 48 CFR 1450.101-3 - Records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Records. 1450.101-3... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.101-3 Records. The records of actions taken under FAR Part 50 shall be maintained by the Director, PAM. ...

  1. 48 CFR 1450.101-3 - Records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Records. 1450.101-3... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 1450.101-3 Records. The records of actions taken under FAR Part 50 shall be maintained by the Director, PAM. ...

  2. Maywood Interim Storage Site: Annual environmental report for calendar year 1990, Maywood, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    Environmental monitoring of the US Department of Energy's (DOE) Maywood Interim Storage Site (MISS) and surrounding area began in 1984. MISS is part of the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The MISS Environmental monitoring programs was established to accommodate facility characteristics, applicable regulations, hazard potential, quantities and concentrations of materials released, extent and use of affected land and water, and localmore » public interest or concern. The environmental monitoring program at MISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and total uranium, radium-226, and thorium-232 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards; federal, state, and local applicable or relevant and appropriate requirements (ARARs); and/or DOE derived concentration guidelines (DCGs). Environmental standards, ARARs, and DCGs are established to protect public health and the environment. Results from the 1990 environmental monitoring program show that concentrations of the contaminants of concern were all below applicable standards. Because the site is used only for interim storage and produces no processing effluents, all monitoring, except for radon and direct gamma radiation, was done on a quarterly basis. 18 refs., 17 figs., 28 tabs.« less

  3. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  4. 41 CFR 60-2.32 - Affirmative action records.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Affirmative action records. 60-2.32 Section 60-2.32 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 2-AFFIRMATIVE ACTION PROGRAMS Miscellaneous § 60-2.32 Affirmative action records. The...

  5. 41 CFR 60-2.32 - Affirmative action records.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Affirmative action records. 60-2.32 Section 60-2.32 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 2-AFFIRMATIVE ACTION PROGRAMS Miscellaneous § 60-2.32 Affirmative action records. The...

  6. Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-07-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation.more » The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.« less

  7. Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation.more » The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.« less

  8. 48 CFR 50.101-3 - Records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Records. 50.101-3 Section... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 50.101-3 Records. Agencies shall maintain complete records of all actions taken under this Subpart 50.1. For each request for...

  9. 48 CFR 50.101-3 - Records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Records. 50.101-3 Section... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 50.101-3 Records. Agencies shall maintain complete records of all actions taken under this Subpart 50.1. For each request for...

  10. 48 CFR 50.101-3 - Records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Records. 50.101-3 Section... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 50.101-3 Records. Agencies shall maintain complete records of all actions taken under this Subpart 50.1. For each request for...

  11. 48 CFR 50.101-3 - Records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Records. 50.101-3 Section... EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 50.101-3 Records. Agencies shall maintain complete records of all actions taken under this Subpart 50.1. For each request for...

  12. Maywood Interim Storage Site environmental report for calendar year 1992, 100 West Hunter Avenue, Maywood, New Jersey. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-05-01

    This report describes the environmental surveillance program at the Maywood Interim Storage Site (MISS) and provides the results for 1992. Environmental monitoring of MISS began in 1984, when the site was assigned to DOE by Congress through the Energy and Water Development Appropriations Act and was placed under DOE`s Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP was established to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. MISS is part of amore » National Priorities List (NPL) site. The environmental surveillance program at MISS includes sampling networks for radon and thoron in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium in surface water, sediment, and groundwater. Additionally, chemical analysis includes metals and organic compounds in surface water and groundwater and metals in sediments. This program assists in fulfilling the DOE objective of measuring and monitoring effluents from DOE activities and calculating hypothetical doses to members of the general public. Monitoring results are compared with applicable Environmental Protection Agency (EPA) and state standards, DOE derived concentration guides (DCGs), dose limits, and other DOE requirements. Environmental standards are established to protect public health and the environment. The radiological data for all media sampled support the conclusion that doses to the public are not distinguishable from natural background radiation.« less

  13. Intracellular recording of action potentials by nanopillar electroporation.

    PubMed

    Xie, Chong; Lin, Ziliang; Hanson, Lindsey; Cui, Yi; Cui, Bianxiao

    2012-02-12

    Action potentials have a central role in the nervous system and in many cellular processes, notably those involving ion channels. The accurate measurement of action potentials requires efficient coupling between the cell membrane and the measuring electrodes. Intracellular recording methods such as patch clamping involve measuring the voltage or current across the cell membrane by accessing the cell interior with an electrode, allowing both the amplitude and shape of the action potentials to be recorded faithfully with high signal-to-noise ratios. However, the invasive nature of intracellular methods usually limits the recording time to a few hours, and their complexity makes it difficult to simultaneously record more than a few cells. Extracellular recording methods, such as multielectrode arrays and multitransistor arrays, are non-invasive and allow long-term and multiplexed measurements. However, extracellular recording sacrifices the one-to-one correspondence between the cells and electrodes, and also suffers from significantly reduced signal strength and quality. Extracellular techniques are not, therefore, able to record action potentials with the accuracy needed to explore the properties of ion channels. As a result, the pharmacological screening of ion-channel drugs is usually performed by low-throughput intracellular recording methods. The use of nanowire transistors, nanotube-coupled transistors and micro gold-spine and related electrodes can significantly improve the signal strength of recorded action potentials. Here, we show that vertical nanopillar electrodes can record both the extracellular and intracellular action potentials of cultured cardiomyocytes over a long period of time with excellent signal strength and quality. Moreover, it is possible to repeatedly switch between extracellular and intracellular recording by nanoscale electroporation and resealing processes. Furthermore, vertical nanopillar electrodes can detect subtle changes in action potentials induced by drugs that target ion channels.

  14. Intracellular recording of action potentials by nanopillar electroporation

    NASA Astrophysics Data System (ADS)

    Xie, Chong; Lin, Ziliang; Hanson, Lindsey; Cui, Yi; Cui, Bianxiao

    2012-03-01

    Action potentials have a central role in the nervous system and in many cellular processes, notably those involving ion channels. The accurate measurement of action potentials requires efficient coupling between the cell membrane and the measuring electrodes. Intracellular recording methods such as patch clamping involve measuring the voltage or current across the cell membrane by accessing the cell interior with an electrode, allowing both the amplitude and shape of the action potentials to be recorded faithfully with high signal-to-noise ratios. However, the invasive nature of intracellular methods usually limits the recording time to a few hours, and their complexity makes it difficult to simultaneously record more than a few cells. Extracellular recording methods, such as multielectrode arrays and multitransistor arrays, are non-invasive and allow long-term and multiplexed measurements. However, extracellular recording sacrifices the one-to-one correspondence between the cells and electrodes, and also suffers from significantly reduced signal strength and quality. Extracellular techniques are not, therefore, able to record action potentials with the accuracy needed to explore the properties of ion channels. As a result, the pharmacological screening of ion-channel drugs is usually performed by low-throughput intracellular recording methods. The use of nanowire transistors, nanotube-coupled transistors and micro gold-spine and related electrodes can significantly improve the signal strength of recorded action potentials. Here, we show that vertical nanopillar electrodes can record both the extracellular and intracellular action potentials of cultured cardiomyocytes over a long period of time with excellent signal strength and quality. Moreover, it is possible to repeatedly switch between extracellular and intracellular recording by nanoscale electroporation and resealing processes. Furthermore, vertical nanopillar electrodes can detect subtle changes in action potentials induced by drugs that target ion channels.

  15. Analysis of the quality of image data acquired by the LANDSAT-4 thematic mapper and multispectral scanners

    NASA Technical Reports Server (NTRS)

    Colwell, R. N. (Principal Investigator)

    1983-01-01

    The three types of LANDSAT 4 film products generally accessible to the user community were analyzed and attempts were made to acquire a data set consisting of a variety of TM and MSS image products for the Sacramento and San Francisco Bay Area test sites. On request, the EDC developed an interim TM analytical film by using a leaser beam recorder to produce black and white masters from which natural and false color composites were created.

  16. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  17. 25 CFR 700.273 - Request for notification of existence of records: Action on.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... records were compiled in reasonable anticipation of a civil action or proceeding or (ii) the system of.... (2) If the records were compiled in reasonable anticipation of a civil action or proceeding or the...

  18. 36 CFR 1008.12 - Requests for notification of existence of records: Action on.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...: (i) The records were compiled in reasonable anticipation of a civil action or proceeding; or (ii) The... rulemaking. (2) If the records were compiled in reasonable anticipation of a civil action or proceeding or...

  19. The optimal distance between two electrode tips during recording of compound nerve action potentials in the rat median nerve

    PubMed Central

    Li, Yongping; Lao, Jie; Zhao, Xin; Tian, Dong; Zhu, Yi; Wei, Xiaochun

    2014-01-01

    The distance between the two electrode tips can greatly influence the parameters used for recording compound nerve action potentials. To investigate the optimal parameters for these recordings in the rat median nerve, we dissociated the nerve using different methods and compound nerve action potentials were orthodromically or antidromically recorded with different electrode spacings. Compound nerve action potentials could be consistently recorded using a method in which the middle part of the median nerve was intact, with both ends dissociated from the surrounding fascia and a ground wire inserted into the muscle close to the intact part. When the distance between two stimulating electrode tips was increased, the threshold and supramaximal stimulating intensity of compound nerve action potentials were gradually decreased, but the amplitude was not changed significantly. When the distance between two recording electrode tips was increased, the amplitude was gradually increased, but the threshold and supramaximal stimulating intensity exhibited no significant change. Different distances between recording and stimulating sites did not produce significant effects on the aforementioned parameters. A distance of 5 mm between recording and stimulating electrodes and a distance of 10 mm between recording and stimulating sites were found to be optimal for compound nerve action potential recording in the rat median nerve. In addition, the orthodromic compound action potential, with a biphasic waveform that was more stable and displayed less interference (however also required a higher threshold and higher supramaximal stimulus), was found to be superior to the antidromic compound action potential. PMID:25206798

  20. Health care fraud and abuse data collection program: technical revisions to healthcare integrity and protection data bank data collection activities. Interim final rule with comment period.

    PubMed

    2004-06-17

    The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.

  1. 78 FR 26117 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ...Through this interim final rule, NMFS announces that it partially approves Framework Adjustment 48 to the NE Multispecies Fishery Management Plan (FMP) and implements the approved measures in the regulations. Framework 48 is the first of two parallel and related actions developed by the New England Fishery Management Council (Council) to respond to updated stock status information and to adjust other management measures in the NE multispecies (groundfish) fishery beginning in fishing year (FY) 2013. This action implements new status determination criteria for Gulf of Maine (GOM) cod, Georges Bank (GB) cod, Southern New England/Mid-Atlantic (SNE/MA) yellowtail flounder, and white hake based on new benchmark assessments completed for these stocks in 2012 and 2013. NMFS is approving and implementing updated status determination criteria for white hake through this interim final rule and accepting further comment on this measure since it was not available for comment in the Framework 48 proposed rule. NMFS will publish a subsequent final rule to respond to any comments received, if necessary. Through this action, NMFS has also approved and is implementing the following Framework 48 measures: Elimination of dockside monitoring requirements for the groundfish fishery; lower minimum fish sizes for several groundfish stocks; clarified goals and performance standard for groundfish monitoring programs; revisions to the allocation of GB yellowtail flounder to the scallop fishery; and establishment of sub-annual catch limits (ACLs) of GB yellowtail flounder and SNE/MA windowpane flounder for the scallop and other non- groundfish fisheries. NMFS also approved revisions to recreational and commercial accountability measures (AMs), including amendments to existing AMs for windowpane flounder, ocean pout, and Atlantic halibut, and new ``reactive'' AMs for Atlantic wolffish and SNE/MA winter flounder, to address a remand by the U.S. District Court of Appeals. NMFS disapproved some measures in Framework 48: A provision for cost- sharing of monitoring costs between the industry and NMFS; a provision to delay industry-funded monitoring to FY 2014; finer scale discard rate strata for GB yellowtail flounder; and a provision to remove requirements for groundfish trawlers to stow their gear when transiting closed areas. Through this interim final rule, NMFS also withdraws a proposed correction to the regulations specific to monitoring of the Eastern U.S./Canada quotas, and will be accepting additional public comment on this issue. These measures are necessary to meet the requirements of the FMP and the Magnuson-Stevens Act, most notably preventing overfishing, ensuring that management measures are based on the best available science, and mitigating, to the extent practicable, potential negative economic impacts from reductions in catch limits anticipated for fishing year FY 2013.

  2. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  3. Hazelwood Interim Storage Site annual environmental report for calendar year 1991, Hazelwood, Missouri

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation`s atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less

  4. 25 CFR 62.10 - Action by the Director.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Secretary for final action together with any relevant information or records; the recommendations of the... to the Assistant Secretary for final action together with any relevant information or records; the... record as presented together with such additional information as may be considered pertinent. Any...

  5. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts—An Interim Process Evaluation

    PubMed Central

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Neal, Bruce

    2017-01-01

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention (n = 22) or control (n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies (p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government’s Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods. PMID:29039802

  6. Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts-An Interim Process Evaluation.

    PubMed

    Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Dunford, Elizabeth K; Wu, Jason H Y; Neal, Bruce

    2017-10-17

    The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention ( n = 22) or control ( n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies ( p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government's Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods.

  7. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  8. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  9. An intercomparison of multidecadal observational and reanalysis data sets for global total ozone trends and variability analysis

    NASA Astrophysics Data System (ADS)

    Bai, Kaixu; Chang, Ni-Bin; Shi, Runhe; Yu, Huijia; Gao, Wei

    2017-07-01

    A four-step adaptive ozone trend estimation scheme is proposed by integrating multivariate linear regression (MLR) and ensemble empirical mode decomposition (EEMD) to analyze the long-term variability of total column ozone from a set of four observational and reanalysis total ozone data sets, including the rarely explored ERA-Interim total ozone reanalysis, from 1979 to 2009. Consistency among the four data sets was first assessed, indicating a mean relative difference of 1% and root-mean-square error around 2% on average, with respect to collocated ground-based total ozone observations. Nevertheless, large drifts with significant spatiotemporal inhomogeneity were diagnosed in ERA-Interim after 1995. To emphasize long-term trends, natural ozone variations associated with the solar cycle, quasi-biennial oscillation, volcanic aerosols, and El Niño-Southern Oscillation were modeled with MLR and then removed from each total ozone record, respectively, before performing EEMD analyses. The resulting rates of change estimated from the proposed scheme captured the long-term ozone variability well, with an inflection time of 2000 clearly detected. The positive rates of change after 2000 suggest that the ozone layer seems to be on a healing path, but the results are still inadequate to conclude an actual recovery of the ozone layer, and more observational evidence is needed. Further investigations suggest that biases embedded in total ozone records may significantly impact ozone trend estimations by resulting in large uncertainty or even negative rates of change after 2000.

  10. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  11. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  12. 47 CFR 0.285 - Record of actions taken.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL COMMISSION ORGANIZATION Delegations of Authority Chief, Media Bureau § 0.285 Record of actions taken. The history card, the station file, and other appropriate files are designated to be the official records of action taken by the Chief of the Media Bureau. The...

  13. Enhancement of cooperation in the spatial prisoner's dilemma with a coherence-resonance effect through annealed randomness at a cooperator-defector boundary; comparison of two variant models

    NASA Astrophysics Data System (ADS)

    Tanimoto, Jun

    2016-11-01

    Inspired by the commonly observed real-world fact that people tend to behave in a somewhat random manner after facing interim equilibrium to break a stalemate situation whilst seeking a higher output, we established two models of the spatial prisoner's dilemma. One presumes that an agent commits action errors, while the other assumes that an agent refers to a payoff matrix with an added random noise instead of an original payoff matrix. A numerical simulation revealed that mechanisms based on the annealing of randomness due to either the action error or the payoff noise could significantly enhance the cooperation fraction. In this study, we explain the detailed enhancement mechanism behind the two models by referring to the concepts that we previously presented with respect to evolutionary dynamic processes under the names of enduring and expanding periods.

  14. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  15. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  16. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  17. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  18. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  19. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  20. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...

  1. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  2. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  3. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  4. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  5. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  6. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  7. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  8. Colonie Interim Storage Site annual environmental report for calendar year 1991, Colonie, New York. Formerly Utilized Sites Remedial Action Program (FUSRAP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-09-01

    This document describes the environmental monitoring program at the Colonie Interim Storage Site (CISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring at CISS began in 1984 when Congress added the site to the US Department of Energy`s Formerly Utilized Sites Remedial Action Program. CISS property and surrounding areas were radioactively contaminated by operations conducted by National Lead Industries, which manufactured various components from uranium and thorium from 1958 to 1984. The environmental monitoring program at CISS includes sampling networks for external gamma radiation exposure and for radium-226, thorium-232, and total uranium concentrations inmore » surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. In 1992 the program will also include sampling networks for radioactive and chemical contaminants in stormwater to meet permit application requirements under the Clean Water Act. Monitoring results are compared with applicable Environmental Protection Agency (EPA) standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE.orders. Environmental standards are established to protect public health and the environment. Results of environmental monitoring during 1991 indicate that average concentrations of radioactive contaminants of concern were well below applicable standards and DCGS. Concentrations of some chemical contaminants in groundwater were above-the New York State Department of Environmental Conservation (Class GA) and EPA guidelines for drinking water. The potential annual radiation exposure (excluding background) calculated for a hypothetical maximally exposed individual is 0.23 mrem (milliroentgen equivalent man), which is less than an individual would receive while traveling in an airplane at 12,000 meters (39,000 feet) for one hour.« less

  9. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  10. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  11. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  12. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  13. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  14. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  16. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  17. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  18. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  19. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  20. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  1. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  2. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  3. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  4. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  5. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  6. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  7. 43 CFR 2.61 - Requests for notification of existence of records: Action on.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contains records pertaining to them unless (i) the records were compiled in reasonable anticipation of a... reasonable anticipation of a civil action or proceeding or the system of records is one which has been...

  8. 40 CFR 63.9550 - In what form and how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record, according to § 63.10(b)(1). You can keep the records...

  9. 40 CFR 63.7192 - In what form and how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record, according to § 63.10(b)(1). You can keep the records...

  10. 40 CFR 63.8822 - In what form and how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record, according to § 63.10(b)(1). You can keep the records...

  11. 29 CFR 1209.06 - Action necessary to close meetings; record of votes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 4 2010-07-01 2010-07-01 false Action necessary to close meetings; record of votes. 1209.06 Section 1209.06 Labor Regulations Relating to Labor (Continued) NATIONAL MEDIATION BOARD PUBLIC OBSERVATION OF NATIONAL MEDIATION BOARD MEETINGS § 1209.06 Action necessary to close meetings; record of votes...

  12. 40 CFR 300.820 - Administrative record file for a removal action.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SUBSTANCES POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.820 Administrative record file for a removal action. (a) If, based on the site evaluation, the lead agency determines... public comment. At such time, the lead agency shall publish in a major local newspaper of general...

  13. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  14. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  15. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  16. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  17. 40 CFR 300.800 - Establishment of an administrative record.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... POLLUTION CONTINGENCY PLAN Administrative Record for Selection of Response Action § 300.800 Establishment of... agency for a federal facility. (3) If EPA is involved in the selection of the response action at a... record that contains the documents that form the basis for the selection of a response action. The lead...

  18. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  19. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  20. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  1. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  2. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  3. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  4. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  5. Disclosure of information to organ procurement organizations. Interim final rule.

    PubMed

    2007-08-23

    This document amends the Department of Veterans Affairs (VA) regulations to implement section 204 of the Veterans Benefits, Health Care, and Information Technology Act of 2006. This regulatory change will provide authority for VA to provide individually-identifiable VA medical records of veterans or dependents of veterans who are deceased or whose death is imminent to representatives of organ procurement organizations (OPOs) as defined in section 371(b) of the Public Health Service Act (PHS Act), eye banks, and tissue banks to determine whether the patients are suitable potential donors.

  6. A Brief Survey of the Mosquitoes of South Sulawesi, Indonesia, with Special Reference to the Identity of ’Anopheles barbirostris’ (Diptera: Culicidae) from the Margolembo Area

    DTIC Science & Technology

    1977-06-20

    mosquitoes hitherto recorded from Sulawesi and adjacent islands is presented. The prevalence of malaria and filariasis in transmigration villages of...East Indian mosquitoes. Bull. Ent. Res. 25: 501-19, illus. 1939. Notes on Dutch East- Indian mosquitoes. Tij&hr. Ent. 82: 91-113, illus. Brug, S...Macdonald, W. W. 1957. Malaysian parasites. XVI. An interim review of the non-anopheline mosquitoes of Malaya. Stud. Inst. Med. Res., Malaya 28: l-34

  7. 40 CFR 63.3931 - In what form and for how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record according to § 63.10(b)(1). You may keep the records off...

  8. 40 CFR 63.8645 - In what form and for how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c) You..., maintenance, corrective action, report, or record, according to § 63.10(b)(1). You may keep the records...

  9. 40 CFR 63.4313 - In what form and for how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record, according to § 63.10(b)(1). You may keep the records off...

  10. 40 CFR 63.7843 - In what form and how long must I keep my records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... following the date of each occurrence, measurement, maintenance, corrective action, report, or record. (c..., maintenance, corrective action, report, or record according to § 63.10(b)(1). You can keep the records offsite...

  11. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  12. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  13. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  14. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  15. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  16. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  17. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  18. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  19. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  20. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  1. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  2. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  3. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  4. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  5. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  6. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  7. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  8. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  9. 5 CFR 1630.12 - Action on request to amend a record.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS § 1630.12 Action on request to amend a record. (a) For TSP records, the record keeper will... chart in § 1630.11, within 10 work days. Requests received by the record keeper which are to be decided by the current or former employing agency will be sent to that agency by the record keeper within 3...

  10. Proposed Amendment to the Final Decision Document for the Hydrazine Blending and Storage Facility, Interim Response Action

    DTIC Science & Technology

    1991-02-25

    OerAtlonl n eor$. 12.15 eflerne tHI IRE III N~ l~l 1111 111111 [10 liii 0I tr. oOffýe of Ni’a eerTe~ n.’ gmo e !oe. ojporcrm. q.,ucto, 9,r7ect f0704-0...Sewage Treatment Plant (STP) of hydrazine wastewater treated to 5 pg/l of NDMA. AEHA’s findings were published in a study released to PMRMA on October 22...the disposal alternative, the EPA would not issue a National Pollutant Discharge Elimination System (NPDES) permit to allow disposal of the treated

  11. Retail sales of scheduled listed chemical products; self-certification of regulated sellers of scheduled listed chemical products. Interim final rule with request for comment.

    PubMed

    2006-09-26

    In March 2006, the President signed the Combat Methamphetamine Epidemic Act of 2005, which establishes new requirements for retail sales of over-the-counter (nonprescription) products containing the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine. The three chemicals can be used to manufacture methamphetamine illegally. DEA is promulgating this rule to incorporate the statutory provisions and make its regulations consistent with the new requirements. This action establishes daily and 30-day limits on the sales of scheduled listed chemical products to individuals and requires recordkeeping on most sales.

  12. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  13. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  14. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  15. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  16. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  17. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  18. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  19. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  20. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  1. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  2. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  3. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  4. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  5. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  6. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  7. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  8. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  9. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  10. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  11. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  12. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  13. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  14. 75 FR 65528 - Membership of the National Science Board's Senior Executive Service Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...

  15. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  16. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  17. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  18. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  19. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  20. 10 CFR 1008.10 - Action in response to a request for correction or amendment of records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Action in response to a request for correction or amendment of records. 1008.10 Section 1008.10 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) RECORDS MAINTAINED ON INDIVIDUALS (PRIVACY ACT) Requests for Access or Amendment § 1008.10 Action in response to a...

Top