Breaking the Cycle of Drug Abuse. 1993 Interim National Drug Control Strategy.
ERIC Educational Resources Information Center
Office of National Drug Control Policy, Washington, DC.
This Interim Drug Strategy is intended to give a new sense of direction and to reinvigorate the nation's efforts against drug trafficking and abuse. The preface to the report lists eight new strategies that the Administration will implement: (1) make drug policy a cornerstone of domestic and social policy; (2) target pregnant women, children, and…
ERIC Educational Resources Information Center
Dansereau, Donald F.; And Others
The purpose of this current research effort was to identify and validate the effectiveness of alternative learning strategies. Learners employing networking and interactive peer study substrategies achieved more than did no-treatment controls. Similarly, strategies-trained learners reported greater positive learning attitude changes than did…
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
24 CFR 35.820 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...
Implementation of EPA criminal enforcement strategy for RCRA interim status facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-11-15
The directive discusses criminal enforcement priorities and procedures related to the RCRA section 3007(e)(2) Loss of Interim Status (LOIS) provision, including: (1) identifying/targeting facilities with violations, (2) verifying receipt of RCRA 3007 letters, and (3) inspections of facilities. The directive supplements directive no. 9930.0-1 RCRA LOIS Enforcement Strategy, dated October 15, 1985. The directive is supplemented by directive no. 9930.0-2a, Accepting Nonhazardous Waste After Losing Interim Status, dated December 20, 1986.
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...
Staff Reactions to Interim Leadership in a Student Affairs Organization
ERIC Educational Resources Information Center
Jones, Robin D.
2011-01-01
Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kupar, J.; Hasek, M.
The Sanitary Landfill Corrective Action Plan proposes a two pronged approach to remediation. The first part of the total remediation strategy is the placement of a RCRA style closure cap to provide source control of contaminants into the groundwater. The second part of the proposed remediation package is a phased approach primarily using an in situ bioremediation system for groundwater clean up of the Constituents of Concern (COCs) that exceed their proposed Alternate Concentration Limits (ACL). The phased in approach of groundwater clean up will involve operation of the in situ bioremediation system, followed by evaluation of the Phase 1more » system and, if necessary, additional phased remediation strategies. This document presents pertinent information on operations, well locations, anticipated capture zones, monitoring strategies, observation wells and other information which will allow a decision on the acceptability of the remedial strategy as an interim corrective action prior to permit application approval. The proposed interim phase of the remediation program will position two horizontal bioremediation wells such that the respective zones of influence will intersect the migration path for the highest concentrations of each plume.« less
Innovative Solidification Techniques for Hazardous Wastes at Army Installations.
1985-11-01
Fixed Hazardous Industrial Wastes and Flue Gas Desulfurization Sludges," Interim Report, EPA-600/2-76-182, US Environmental Protection Agency... flue gas . Flyash from coal-fired power plants is an almost entirely inorganic product having a glassy nature. Consequently, flyash by itself has little...effective- ness of alternative control strategies for reducing environmental impacts. 4. % 46 -"- °° ~~~~~...-.-..o
School Health Program. Interim Guide. Grade 9.
ERIC Educational Resources Information Center
Northwest Territories Dept. of Education, Yellowknife.
This interim guide, a component of the Northwest Territories (Canada) School Health Program, includes instructional strategies, lesson plans, reproducibles, and teacher background materials for ninth grade classes. The material is organized around the three curriculum units: (1) the mental and emotional well-being unit which has three lessons on…
Interim Land Use Control Implementation Plan
NASA Technical Reports Server (NTRS)
Applegate, Joseph L.
2014-01-01
This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.
Graf, Alexandra C; Bauer, Peter
2011-06-30
We calculate the maximum type 1 error rate of the pre-planned conventional fixed sample size test for comparing the means of independent normal distributions (with common known variance) which can be yielded when sample size and allocation rate to the treatment arms can be modified in an interim analysis. Thereby it is assumed that the experimenter fully exploits knowledge of the unblinded interim estimates of the treatment effects in order to maximize the conditional type 1 error rate. The 'worst-case' strategies require knowledge of the unknown common treatment effect under the null hypothesis. Although this is a rather hypothetical scenario it may be approached in practice when using a standard control treatment for which precise estimates are available from historical data. The maximum inflation of the type 1 error rate is substantially larger than derived by Proschan and Hunsberger (Biometrics 1995; 51:1315-1324) for design modifications applying balanced samples before and after the interim analysis. Corresponding upper limits for the maximum type 1 error rate are calculated for a number of situations arising from practical considerations (e.g. restricting the maximum sample size, not allowing sample size to decrease, allowing only increase in the sample size in the experimental treatment). The application is discussed for a motivating example. Copyright © 2011 John Wiley & Sons, Ltd.
2009-04-06
The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.
Development of interim oak assessment guidelines for the silvah decision-support system
Patrick H. Brose
2007-01-01
Updates to the SILVAH decision-support system make it more applicable to the mixed oak forests of Pennsylvania and other mid-Atlantic states. This update required establishing interim inventory guidelines for assessing the competitive ability of advance oak regeneration. This assessment was complicated by oakâs growth strategy, emphasizing root development in lieu of...
Intelligent cruise control field operational test : interim report
DOT National Transportation Integrated Search
1997-03-01
This interim document reports on a cooperative agreement between NHTSA and UMTRI entitled Intelligent Cruise Control (ICC) Field Operational Test (FOT). The overarching goal of the work is to characterize safety and comfort issues that are fundamenta...
Natalie A. Bolon; Christopher S. Hansen-Murray; Richard W. Haynes
1995-01-01
Implications of the interim comprehensive strategy for improved Pacific salmon and steelhead habitat management (PACFISH) were estimated for those Bureau of Land Management (BLM) districts and National Forest System (NFS) lands west of the Rocky Mountains that have anadromous fish. The physical impacts and associated mitigation costs from implementing the PACFISH...
EPA/CDC Interim Clearance Strategy for Environments Contaminated with Anthrax
Strategy for public health and environmental Federal responders to aid Incident Command/Unified Command (IC/UC) in clearing a building or an outdoor environment after an incident involving contamination with Bacillus anthracis (B. anthracis)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... Interim Implementation Guide for the National Health Security Strategy of the United States of America...
Adaptive graph-based multiple testing procedures
Klinglmueller, Florian; Posch, Martin; Koenig, Franz
2016-01-01
Multiple testing procedures defined by directed, weighted graphs have recently been proposed as an intuitive visual tool for constructing multiple testing strategies that reflect the often complex contextual relations between hypotheses in clinical trials. Many well-known sequentially rejective tests, such as (parallel) gatekeeping tests or hierarchical testing procedures are special cases of the graph based tests. We generalize these graph-based multiple testing procedures to adaptive trial designs with an interim analysis. These designs permit mid-trial design modifications based on unblinded interim data as well as external information, while providing strong family wise error rate control. To maintain the familywise error rate, it is not required to prespecify the adaption rule in detail. Because the adaptive test does not require knowledge of the multivariate distribution of test statistics, it is applicable in a wide range of scenarios including trials with multiple treatment comparisons, endpoints or subgroups, or combinations thereof. Examples of adaptations are dropping of treatment arms, selection of subpopulations, and sample size reassessment. If, in the interim analysis, it is decided to continue the trial as planned, the adaptive test reduces to the originally planned multiple testing procedure. Only if adaptations are actually implemented, an adjusted test needs to be applied. The procedure is illustrated with a case study and its operating characteristics are investigated by simulations. PMID:25319733
Environmental DNA calibration study. Interim technical review report
Baerwaldt, K.; Bartron, Meredith L.; Schilling, K.; Lee, Debbie; Russo, Edmond; Estes, Trudy; Fischer, Richard; Fleming, Beth; Guilfoyle, Michael P.; Kilgore, K. Jack; Lance, Richard; Perkins, Edward; Schultz, Martin; Smith, David; Amberg, Jon J.; Chapman, Duane C.; Gaikowski, Mark P.; Klymus, Katy E.; Richter, Catherine A.
2014-01-01
Should a sustainable Asian carp population become established in the Great Lakes, native fish populations, as well as many threatened or endangered plant/animal species populations, could be impacted. In response to this threat, the Asian Carp Regional Control Committee (ACRCC) was formed in part to coordinate efforts to understand and organize against the Asian carp threat. The Asian Carp Control Strategy Framework (2012a) outlined major tasks to be completed for a better understanding of factors related to the advance of Asian carp populations towards the Great Lakes. In addition, the ACRCC formed the Monitoring and Rapid Response Workgroup to address Asian carp monitoring and removal (ACRCC 2012b).
22 CFR 127.8 - Interim suspension.
Code of Federal Regulations, 2010 CFR
2010-04-01
... world peace or the security or foreign policy of the United States. The interim suspension orders... Trade Controls will issue an appropriate order disposing of the motion or petition and will promptly...
40 CFR 1045.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Are there interim provisions that apply only for a limited time? 1045.145 Section 1045.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM SPARK-IGNITION PROPULSION...
40 CFR 1045.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Are there interim provisions that apply only for a limited time? 1045.145 Section 1045.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM SPARK-IGNITION PROPULSION...
A randomized controlled trial of interim methadone maintenance.
Schwartz, Robert P; Highfield, David A; Jaffe, Jerome H; Brady, Joseph V; Butler, Carol B; Rouse, Charles O; Callaman, Jason M; O'Grady, Kevin E; Battjes, Robert J
2006-01-01
Effective alternatives to long waiting lists for entry into methadone hydrochloride maintenance treatment are needed to reduce the complications of continuing heroin dependence and to increase methadone treatment entry. To compare the effectiveness of interim methadone maintenance with that of the usual waiting list condition in facilitating methadone treatment entry and reducing heroin and cocaine use and criminal behavior. Randomized, controlled, clinical trial using 2 conditions, with treatment assignment on a 3:2 basis to interim maintenance-waiting list control. A methadone treatment program in Baltimore. A total of 319 individuals meeting the criteria for current heroin dependence and methadone maintenance treatment. Participants were randomly assigned to either interim methadone maintenance, consisting of an individually determined methadone dose and emergency counseling only for up to 120 days, or referral to community-based methadone treatment programs. Entry into comprehensive methadone maintenance therapy at 4 months from baseline; self-reported days of heroin use, cocaine use, and criminal behavior; and number of urine drug test results positive for heroin and cocaine at the follow-up interview conducted at time of entry into comprehensive methadone treatment (or at 4 months from baseline for participants who did not enter regular treatment). Significantly more participants assigned to the interim methadone maintenance condition entered comprehensive methadone maintenance treatment by the 120th day from baseline (75.9%) than those assigned to the waiting list control condition (20.8%) (P<.001). Overall, in the past 30 days at follow-up, interim participants reported significantly fewer days of heroin use (P<.001), had a significant reduction in heroin-positive drug test results (P<.001), reported spending less money on drugs (P<.001), and received less illegal income (P<.02) than the waiting list participants. Interim methadone maintenance results in a substantial increase in the likelihood of entry into comprehensive treatment, and is an effective means of reducing heroin use and criminal behavior among opioid-dependent individuals awaiting entry into a comprehensive methadone treatment program.
76 FR 10089 - Value-Added Producer Grant Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-23
..., business plans, and marketing strategies. The program will also provide working capital for expenses such as implementing an existing viable marketing strategy. The Agency will implement the program to meet... projects that develop mid-tier value marketing chains. DATES: This interim rule is effective March 25, 2011...
Publishing interim results of randomised clinical trials in peer-reviewed journals.
Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan
2017-02-01
Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.
Computerization of material test data reporting system : interim report.
DOT National Transportation Integrated Search
1973-09-01
This study was initiated to provide an integrated system of reporting, storing, and retrieving of construction and material test data using computerized (storage-retrieval) and quality control techniques. The findings reported in this interim report ...
Code of Federal Regulations, 2011 CFR
2011-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...
Code of Federal Regulations, 2012 CFR
2012-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...
Code of Federal Regulations, 2010 CFR
2010-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...
Code of Federal Regulations, 2014 CFR
2014-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...
Code of Federal Regulations, 2013 CFR
2013-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.481 Stripping quantities and interim standards for Category B NLS tanks on... paragraph (b)(1) of this section and does not automatically control the flow rate must have— (i) Manual...
ERIC Educational Resources Information Center
Bekkink, Marleen Olde; Donders, Rogier; van Muijen, Goos N. P.; Ruiter, Dirk J.
2012-01-01
Until now, positive effects of assessment at a medical curriculum level have not been demonstrated. This study was performed to determine whether an interim assessment, taken during a small group work session of an ongoing biomedical course, results in students' increased performance at the formal course examination. A randomized controlled trial…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1978-01-31
This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less
Wu, Wenting; Bot, Brian; Hu, Yan; Geyer, Susan M; Sargent, Daniel J
2013-07-01
Sargent and Goldberg [1] proposed a randomized phase II flexible screening design (SG design) which took multiple characteristics of candidate regimens into consideration in selecting a regimen for further phase III testing. In this paper, we extend the SG design by including provisions for an interim analysis and/or a comparison to a historical control. By including a comparison with a historical control, a modified SG design not only identifies a more promising treatment but also assures that the regimen has a clinically meaningful level of efficacy as compared to a historical control. By including an interim analysis, a modified SG design could reduce the number of patients exposed to inferior treatment regimens. When compared to the original SG design, the modified designs increase the sample size moderately, but expand the utility of the flexible screening design substantially. Copyright © 2013 Elsevier Inc. All rights reserved.
User benefits and funding strategies
NASA Technical Reports Server (NTRS)
Beauchamp, N. A.
1975-01-01
A three-step, systematic method is described for selecting relevant and highly beneficial payloads for the Interim Upper Stage (IUS) that will be used with the space shuttle until the space tug becomes available. Viable cost-sharing strategies which would maximize the number of IUS payloads and the benefits obtainable under a limited NASA budget were also determined.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
40 CFR 94.12 - Interim provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... differences in testing will not affect NOX emission rates. (g) Flexibility for engines over 560kW...) CONTROL OF EMISSIONS FROM MARINE COMPRESSION-IGNITION ENGINES General Provisions for Emission Regulations for Compression-Ignition Marine Engines § 94.12 Interim provisions. This section contains provisions...
Code of Federal Regulations, 2013 CFR
2013-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...
Code of Federal Regulations, 2012 CFR
2012-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...
Code of Federal Regulations, 2014 CFR
2014-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...
Code of Federal Regulations, 2011 CFR
2011-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...
Code of Federal Regulations, 2010 CFR
2010-10-01
... LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Design and Equipment for Pollution Control § 153.482 Stripping quantities and interim standards for Category C NLS tanks on...
Report: EPA’s Management of Interim Status Permitting Needs Improvement to Ensure Continued Progress
Report #2007-P-00005, December 4, 2006. Interim status is a temporary designation, but some units have existed for as many as 25 years without formal issuance or denial of a permit, or other regulatory controls.
Langton, Jennifer; Crampton, Peter
2008-04-18
To determine whether the three main funding formulas for Primary Health Organisations achieved a stated aim of the Primary Health Care Strategy to fund enrolled populations according to need. National data were obtained from the Ministry of Health for a 12-month period beginning in April 2004: these included demographic characteristics of the enrolled Primary Health Organisation population, plus rates tables for: First-Contact Services, Services to Improve Access, and Health Promotion. Funding for Access and Interim practices for four-quarters was calculated for each of these three funding streams. Analysis of the demographic characteristics of Access and Interim practices was undertaken. Maori and Pacific peoples made up a greater proportion of the Access population than the Interim, had higher rates of deprivation than the non-Maori/non-Pacific population, and demonstrated a younger age distribution. The first quarter (April 2004-June 2004) showed there was preferential funding for Access PHOs and in particular high-needs groups. In quarter two, this level of preferential funding had diminished, coinciding with the introduction of increased government funding for all Interim enrolees aged 65 and over. The greater funding for Access enrolees was notably eroded with the introduction of Access-level funding for those aged 65+ in Interim PHOs. Since these data were analysed all remaining Interim age groups have shifted to Access-level funding, benefiting non-Maori /non-Pacific in Interim PHOs. The rapid shift to Access-level funding for First Contact Services has seen a continued erosion of the redistributive effect of the original needs-based formulas. A system cannot be considered equitable if some members of society are not realising their health potential, and financing of primary care should remain redistributive until such a time as this objective is attained.
2008-07-10
The Drug Enforcement Administration (DEA) is finalizing, without change, the Interim Rule with Request for Comment published in the Federal Register on July 25, 2007 (72 FR 40738). The Interim Rule removed the Controlled Substances Act (CSA) exemptions for chemical mixtures containing ephedrine and/or pseudoephedrine with concentration limits at or below five percent. Upon the effective date of the Interim Rule, all ephedrine and pseudoephedrine chemical mixtures, regardless of concentration and form, became subject to the regulatory provisions of the CSA. DEA regulated the importation, exportation, manufacture, and distribution of these chemical mixtures by requiring persons who handle these chemical mixtures to register with DEA, maintain certain records common to business practice, and file certain reports, regarding these chemical mixtures. No comments to the Interim Rule were received. This Final Rule finalizes the Interim Rule without change.
National Aeronautics and Space Administration Exploration Systems Interim Strategy
NASA Technical Reports Server (NTRS)
2004-01-01
Contents include the following: 1. The Exploration Systems Mission Directorate within NASA. Enabling the Vision for Space Exploration. The Role of the Directorate. 2. Strategic Context and Approach. Corporate Focus. Focused, Prioritized Requirements. Spiral Transformation. Management Rigor. 3. Achieving Directorate Objectives. Strategy to Task Process. Capability Development. Research and Technology Development. 4. Beyond the Horizon. Appendices.
Using Scientific Information to Develop Management Strategies for Commercial Redwood Timberlands
Jeffrey C. Barrett
2007-01-01
In 1999, PALCO (Pacific Lumber Company), a private landowner, and the state and federal governments agreed to implement a unique Habitat Conservation Plan (HCP) on 89,000 hectares of commercial redwood and Douglas-fir timberlands in Humboldt County, California. The aquatics portion of the PALCO HCP contains a set of "interim" conservation strategies developed...
Hennessey, Karen; Mendoza-Aldana, Jorge; Bayutas, Benjamin; Lorenzo-Mariano, Kayla Mae; Diorditsa, Sergey
2013-12-27
WHO's Western Pacific Region has the highest rates of hepatitis B virus (HBV) infection in the world; most countries have >8% prevalence of HBV chronic infection in their adult population. In 2005, Member States of the Region adopted a resolution to reduce chronic hepatitis B infection prevalence to less than 2% among children by 2012 as an interim milestone toward a regional goal of less than 1% prevalence. Country commitments to hepatitis B control and successes represent a remarkable public health achievement by preventing over 1 million chronic infections and 300,000 HBV-related deaths per birth cohort. Reported here is a review of the process and strategies for translating this public health initiative into practice including such activities as setting up an Expert Resource Panel, developing implementation guidelines, focusing on facility births while supporting efforts to reach home births, providing guidance for conducting seroprevalence surveys, and establishing a verification process. Copyright © 2012. Published by Elsevier Ltd.
Cunningham, Charles E; Rimas, Heather; Chen, Yvonne; Deal, Ken; McGrath, Patrick; Lingley-Pottie, Patricia; Reid, Graham J; Lipman, Ellen; Corkum, Penny
2015-01-01
Using a discrete choice conjoint experiment, we explored the design of parenting programs as an interim strategy for families waiting for children's mental health treatment. Latent class analysis yielded 4 segments with different design preferences. Simulations predicted the Fast-Paced Personal Contact segment, 22.1% of the sample, would prefer weekly therapist-led parenting groups. The Moderate-Paced Personal Contact segment (24.7%) preferred twice-monthly therapist-led parenting groups with twice-monthly lessons. The Moderate-Paced E-Contact segment (36.3%), preferred weekly to twice-monthly contacts, e-mail networking, and a program combining therapist-led sessions with the support of a computerized telephone e-coach. The Slow-Paced E-Contact segment (16.9%) preferred an approach combining monthly therapist-led sessions, e-coaching, and e-mail networking with other parents. Simulations predicted 45.3% of parents would utilize an option combining 5 therapist coaching calls with 5 e-coaching calls, a model that could reduce costs and extend the availability of interim services. Although 41.0% preferred weekly pacing, 58% were predicted to choose an interim parenting service conducted at a twice-monthly to monthly pace. The results of this study suggest that developing interim services reflecting parental preferences requires a choice of formats that includes parenting groups, telephone-coached distance programs, and e-coaching options conducted at a flexible pace.
Selective primary health care: an interim strategy for disease control in developing countries.
Walsh, J A; Warren, K S
1979-11-01
Priorities among the infectious diseases affecting the three billion people in the less developed world have been based on prevalence, morbidity, mortality and feasibility of control. With these priorities in mind a program of selective primary health care is compared with other approaches and suggested as the most cost-effective form of medical intervention in the least developed countries. A flexible program delivered by either fixed or mobile units might include measles and diphtheria-pertussis-tetanus vaccination, treatment for febrile malaria and oral rehydration for diarrhea in children, and tetanus toxoid and encouragement of breast feeding in mothers. Other interventions might be added on the basis of regional needs and new developments. For major diseases for which control measures are inadequate, research is an inexpensive approach on the basis of cost per infected person per year.
76 FR 79679 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-22
... with a number of collections in this control number, including line count filings for competitive ETCs...'' exception to the interim cap for competitive ETCs. The interim cap limited the total annual amount of high-cost support competitive ETCs in any state could receive to the amount competitive ETCs in that state...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...
Whither tobacco product regulation?
McNeill, Ann; Hammond, David; Gartner, Coral
2012-03-01
Despite decades of industry innovation and regulatory efforts, the harmfulness of conventional cigarettes has not changed. There are several pitfalls in this area, including the long time lag before health impacts of product regulatory changes become apparent, the danger of consumers deriving false reassurance of lesser harm in the interim period, the lack of relevant expertise and the lack of an internationally agreed and evidence-based strategic approach. Articles 9 and 10 of the Framework Convention on Tobacco Control provide the potential for such a global strategy, and knowledge and research has increased significantly over recent years. However, there are huge opportunity costs in implementing product disclosure and regulatory strategies: most national regulators have very limited human and financial resources, which should be focused on other evidence-based tobacco control interventions. We believe therefore that it is now time to abandon the notion of safe or safer cigarettes while moving consumers towards cleaner nicotine products as soon as possible. In parallel to this, we recommend a number of other strategies be implemented including: reducing the appeal of all tobacco products, forbidding new tobacco products or brand variants being marketed without evidence of reduced harm, appeal or addictiveness, and developing a tobacco industry resourced, but industry independent, Framework Convention on Tobacco Control global repository to assist national regulators in understanding and regulating the products on their markets.
... Submit What's this? Submit Button Facts About Riot Control Agents Interim document Recommend on Facebook Tweet Share Compartir What riot control agents are Riot control agents (sometimes referred to ...
2009-01-01
Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383
Evaluation of arterial service patrol programs.
DOT National Transportation Integrated Search
2009-12-01
This evaluation of the Arterial Service Patrol named I-64 Traffic Response (TR) is an interim report covering the first full year of operation. This Arterial Service Patrol was part of a regional traffic management strategy to address mobility issues...
Evaluation of automated flagger assistance devices : interim report.
DOT National Transportation Integrated Search
2017-08-01
Flagger safety is an important issue in work zones due to the proximity of the flagger to traffic. Some strategies for improving flagger safety include slowing down approaching vehicles or removing flaggers from the immediate vicinity of traffic. The...
Gordon H. Reeves; Brian R. Pickard; K. Norman Johnson
2016-01-01
The Aquatic Conservation Strategy (ACS) of the Northwest Forest Plan guides management of riparian and aquatic ecosystems on federal lands in western Oregon, western Washington, and northern California. We applied new scientific findings and tools to evaluate two potential options, A and B, for refining interim riparian reserves to meet ACS goals and likely challenges...
Childs, J E; Kaufmann, A F; Peters, C J; Ehrenberg, R L
1993-07-30
This report provides interim recommendations for prevention and control of hantavirus infections associated with rodents in the southwestern United States. It is based on principles of rodent and infection control and contains specific recommendations for reducing rodent shelter and food sources in and around the home, recommendations for eliminating rodents inside the home and preventing them from entering the home, precautions for preventing hantavirus infection while rodent-contaminated areas are being cleaned up, prevention measures for persons who have occupational exposure to wild rodents, and precautions for campers and hikers.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.
Interim Guidance for the Sanitary Control and Surveillance of Field Water Supplies
2005-07-15
Applicability The guidance in this publication – a. Applies to the Active Army, U.S. Army Reserve, and Army National Guard, and addresses...requirements based on the location/climate, and the anticipated level, duration, and frequency of operational activities (see chapter 3). Interim...drinking. b. Background. Water is a required commodity for numerous activities in deployed environments. The most important of these is
Measles control and elimination in Somalia: the good, the bad, and the ugly.
Kamadjeu, Raoul; Assegid, Kebede; Naouri, Boubker; Mirza, Imran Raza; Hirsi, Abdurazak; Mohammed, Abdurahman; Omer, Mohammed; Dualle, Abdi Hassan; Mulugeta, Abraham
2011-07-01
Despite enormous challenges, Somalia has been successfully implementing accelerated measles control activities since 2005. Through innovative strategies and with the support of local and international partners, the country has shown potentials of implementing measles mortality reduction activities in complex emergencies. Measles incidence has been reduced by >80% after the measles catch-up campaigns of 2005-2007, and national reported measles routine immunization coverage with first dose measles containing vaccine has reached 59% for the first time in 2009. However, the near collapse of the health care system and the ongoing insecurity continue to hamper the implementation of recommended measles control and elimination strategies in some parts of the country, making these achievements fragile. Somalia exemplifies the challenges in meeting measles elimination goals in the World Health Organization Eastern Mediterranean region. As the region is entering its 2010 measles elimination goals, it appears necessary to establish realistic and flexible interim goals for measles control in Somalia that will take into consideration the specificities of the country. Maintaining flexibility in conducting field operations, securing financial resources, multiplying opportunities for measles vaccination, and improving disease monitoring systems will remain vital to sustain and improve current achievements. © The Author 2011. Published by Oxford University Press on behalf of the Infectious Diseases Society of America. All rights reserved.
Possible global strategies for stopping polio vaccination and how they could be harmonized.
Cochi, S L; Sutter, R W; Aylward, R B
2001-01-01
One of the challenges of the polio eradication initiative over the next few years will be the formulation of an optimal strategy for stopping poliovirus vaccination after global certification of polio eradication has been accomplished. This strategy must maximize the benefits and minimize the risks. A number of strategies are currently under consideration, including: (i) synchronized global discontinuation of use of oral poliovirus vaccine (OPV); (ii) regional or subregional coordinated OPV discontinuation; and (iii) moving from trivalent to bivalent or monovalent OPV. Other options include moving from OPV to global use of IPV for an interim period before cessation of IPV use (to eliminate circulation of vaccine-derived poliovirus, if necessary) or development of new OPV strains that are not transmissible. Each of these strategies is associated with specific advantages (financial benefits for OPV discontinuation) and disadvantages (cost of switch to IPV) and inherent uncertainties (risk of continued poliovirus circulation in certain populations or prolonged virus replication in immunodeficient persons). An ambitious research agenda addresses the remaining questions and issues. Nevertheless, several generalities are already clear. Unprecedented collaboration between countries, regions, and indeed the entire world will be required to implement a global OPV discontinuation strategy Regulatory approval will be needed for an interim bivalent OPV or for monovalent OPV in many countries. Manufacturers will need sufficient lead time to produce sufficient quantities of IPV Finally, the financial implications for any of these strategies need to be considered. Whatever strategy is followed it will be necessary to stockpile supplies of a poliovirus-containing vaccine (most probably all three types of monovalent OPV), and to develop contingency plans to respond should an outbreak of polio occur after stopping vaccination.
Control strip study : interim report.
DOT National Transportation Integrated Search
1972-01-01
This report is concerned with the application of the "control strip" technique using nuclear devices for compaction control of certain base courses and asphaltic concrete surface course. The technique, as evaluated here, consisted of applying increas...
2012-07-01
Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ). Another group contains documents relevant to site survey 3 procedures...residents of the contaminated areas. Recovery experience from the Chernobyl incident have demonstrated that direct involvement of inhabitants and local
2012-07-01
on the cleanup of specific sites: those containing only cesium-137 (Goiania) and those containing 137Cs and other radionuclides ( Chernobyl ...targets and consider initiatives to enhance the quality of life of the residents of the contaminated areas. Recovery experience from the Chernobyl
Testing a Model of Participant Retention in Longitudinal Substance Abuse Research
ERIC Educational Resources Information Center
Gilmore, Devin; Kuperminc, Gabriel P.
2014-01-01
Longitudinal substance abuse research has often been compromised by high rates of attrition, thought to be the result of the lifestyle that often accompanies addiction. Several studies have used strategies including collection of locator information at the baseline assessment, verification of the information, and interim contacts prior to…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... district plans, and other strategies, including land acquisition, designed to create walkable, mixed-use... million of the available TIGER II funds for the planning, preparation, or design of Eligible Projects... manner that will be sustainable for generations to come. Therefore, for projects designed to enhance...
ERIC Educational Resources Information Center
Stenstrom, Marja-Leena, Ed.
This four-part publication contains 19 papers on educational practices and promises for post-16 education in European countries. Part I, the introduction, contains these three papers: "Sharpening Post-16 Education Strategies: Building on the Results of the Previous Projects" (Johanna Lasonen); "'Parity of Esteem' and 'Integrated…
Doyle, D M; Dauterive, R; Chuang, K H; Ellrodt, A G
2001-11-01
There are many challenges to effectively and efficiently translating evidence into practice. Potential strategies include (1) training more evidence-based practitioners in the art and science of evidence-based medicine, (2) enhancing the quality and availability of systematic reviews, and (3) more effectively linking evidence-based practitioners and evidence users through comprehensive behavioral change initiatives. Herein we explore the third strategy and highlight the key elements of success for a program using behavioral change strategies. We present a clinical model based on clear understanding of the "problem," a systematic approach to diagnosis, selection of scientifically sound treatment options, and effective evaluation with appropriate modification of the treatment plan. A successful program begins with effective team leadership, the expression of a clinically compelling case for change, and commitment to the pursuit of perfection in the delivery of key evidence-based interventions. The team must then diagnose behavioral barriers to change, using a systematic approach based on a published rigorous differential diagnosis framework. This diagnostic step provides the foundation for selection of effective dissemination and implementation strategies (treatments) proven to improve processes of care and clinical outcomes. Finally the team must evaluate progress toward perfection, reviewing interim data and adjusting the treatment regimen to newly diagnosed barriers. We then present a specific project (improving pneumococcal immunization rates in our rural community) and interim results to demonstrate the use of the framework in the real world.
Re-use of pilot data and interim analysis of pivotal data in MRMC studies: a simulation study
NASA Astrophysics Data System (ADS)
Chen, Weijie; Samuelson, Frank; Sahiner, Berkman; Petrick, Nicholas
2017-03-01
Novel medical imaging devices are often evaluated with multi-reader multi-case (MRMC) studies in which radiologists read images of patient cases for a specified clinical task (e.g., cancer detection). A pilot study is often used to measure the effect size and variance parameters that are necessary for sizing a pivotal study (including sizing readers, non-diseased and diseased cases). Due to the practical difficulty of collecting patient cases or recruiting clinical readers, some investigators attempt to include the pilot data as part of their pivotal study. In other situations, some investigators attempt to perform an interim analysis of their pivotal study data based upon which the sample sizes may be re-estimated. Re-use of the pilot data or interim analyses of the pivotal data may inflate the type I error of the pivotal study. In this work, we use the Roe and Metz model to simulate MRMC data under the null hypothesis (i.e., two devices have equal diagnostic performance) and investigate the type I error rate for several practical designs involving re-use of pilot data or interim analysis of pivotal data. Our preliminary simulation results indicate that, under the simulation conditions we investigated, the inflation of type I error is none or only marginal for some design strategies (e.g., re-use of patient data without re-using readers, and size re-estimation without using the effect-size estimated in the interim analysis). Upon further verifications, these are potentially useful design methods in that they may help make a study less burdensome and have a better chance to succeed without substantial loss of the statistical rigor.
INTERIM ANALYSIS OF THE CONTRIBUTION OF HIGH-LEVEL EVIDENCE FOR DENGUE VECTOR CONTROL.
Horstick, Olaf; Ranzinger, Silvia Runge
2015-01-01
This interim analysis reviews the available systematic literature for dengue vector control on three levels: 1) single and combined vector control methods, with existing work on peridomestic space spraying and on Bacillus thuringiensis israelensis; further work is available soon on the use of Temephos, Copepods and larvivorous fish; 2) or for a specific purpose, like outbreak control, and 3) on a strategic level, as for example decentralization vs centralization, with a systematic review on vector control organization. Clear best practice guidelines for methodology of entomological studies are needed. There is a need to include measuring dengue transmission data. The following recommendations emerge: Although vector control can be effective, implementation remains an issue; Single interventions are probably not useful; Combinations of interventions have mixed results; Careful implementation of vector control measures may be most important; Outbreak interventions are often applied with questionable effectiveness.
Lundell, L; Attwood, S; Ell, C; Fiocca, R; Galmiche, J-P; Hatlebakk, J; Lind, T; Junghard, O
2008-01-01
Background: With the introduction of laparoscopic antireflux surgery (LARS) for gastro-oesophageal reflux disease (GORD) along with the increasing efficacy of modern medical treatment, a direct comparison is warranted. The 3-year interim results of a randomised study comparing both the efficacy and safety of LARS and esomeprazole (ESO) are reported. Methods: LOTUS is an open, parallel-group multicentre, randomised and controlled trial conducted in dedicated centres in 11 European countries. LARS was completed according to a standardised protocol, comprising a total fundoplication and a crural repair. Medical treatment comprised ESO 20 mg once daily, which could be increased stepwise to 40 mg once daily and then 20 mg twice daily in the case of incomplete GORD control. The primary outcome variable was time to treatment failure (Kaplan–Meier analysis). Treatment failure was defined on the basis of symptomatic relapse requiring treatment beyond that stated in the protocol. Results: 554 patients were randomised, of whom 288 were allocated to LARS and 266 to ESO. The two study arms were well matched. The proportions of patients who remained in remission after 3 years were similar for the two therapies: 90% of surgical patients compared with 93% medically treated for the intention to treat population, p = 0.25 (90% vs 95% per protocol). No major unexpected postoperative complications were experienced and ESO was well tolerated. However, postfundoplication complaints remain a problem after LARS. Conclusions: Over the first 3 years of this long-term study, both laparoscopic total fundoplication and continuous ESO treatment were similarly effective and well-tolerated therapeutic strategies for providing effective control of GORD. PMID:18469091
Evaluation of ERA-Interim precipitation data in complex terrain
NASA Astrophysics Data System (ADS)
Gao, Lu; Bernhardt, Matthias; Schulz, Karsten
2013-04-01
Precipitation controls a large variety of environmental processes, which is an essential input parameter for land surface models e.g. in hydrology, ecology and climatology. However, rain gauge networks provides the necessary information, are commonly sparse in complex terrains, especially in high mountainous regions. Reanalysis products (e.g. ERA-40 and NCEP-NCAR) as surrogate data are increasing applied in the past years. Although they are improving forward, previous studies showed that these products should be objectively evaluated due to their various uncertainties. In this study, we evaluated the precipitation data from ERA-Interim, which is a latest reanalysis product developed by ECMWF. ERA-Interim daily total precipitation are compared with high resolution gridded observation dataset (E-OBS) at 0.25°×0.25° grids for the period 1979-2010 over central Alps (45.5-48°N, 6.25-11.5°E). Wet or dry day is defined using different threshold values (0.5mm, 1mm, 5mm, 10mm and 20mm). The correspondence ratio (CR) is applied for frequency comparison, which is the ratio of days when precipitation occurs in both ERA-Interim and E-OBS dataset. The result shows that ERA-Interim captures precipitation occurrence very well with a range of CR from 0.80 to 0.97 for 0.5mm to 20mm thresholds. However, the bias of intensity increases with rising thresholds. Mean absolute error (MAE) varies between 4.5 mm day-1 and 9.5 mm day-1 in wet days for whole area. In term of mean annual cycle, ERA-Interim almost has the same standard deviation of the interannual variability of daily precipitation with E-OBS, 1.0 mm day-1. Significant wet biases happened in ERA-Interim throughout warm season (May to August) and dry biases in cold season (November to February). The spatial distribution of mean annual daily precipitation shows that ERA-Interim significant underestimates precipitation intensity in high mountains and northern flank of Alpine chain from November to March while pronounced overestimate in the southern flank of Alps. The poor topographical and flow related characteristic representation of ERA-Interim model is possibly responsible for the bias. Particularly, the mountain block effect of moisture is weak captured. The comparison demonstrates that ERA-Interim precipitation intensity needs bias correction for further alpine climate studies, although it reasonably captures precipitation frequency. This critical evaluation not only diagnosed the data quality of ERA-Interim, but also provided the evidence for reanalysis products downscaling and bias correction in complex terrain.
Current developments in the treatment of early-stage classical Hodgkin lymphoma.
Borchmann, Sven; von Tresckow, Bastian; Engert, Andreas
2016-09-01
After presenting the current treatment recommendations for early-stage Hodgkin lymphoma, we give an overview on recently published clinical trials in this setting. Furthermore, the potential influence of current trials on the treatment of early-stage Hodgkin lymphoma and integration of newly emerging drugs into treatment protocols will be discussed. Trials attempting treatment de-escalation and omission of radiotherapy on the basis of early interim PET-scans have been disappointing so far, but results of some large trials employing this strategy are still awaited. In contrast, a more defensive strategy of starting treatment with less aggressive doxorubicine, bleomycin, vinblastine, dacarbazine (ABVD) chemotherapy and intensifying treatment in early interim PET-positive patients has shown encouraging results. New drugs such as brentuximab vedotin and immune checkpoint inhibitors have shown promising results in relapsed and refractory Hodgkin lymphoma. Clinical trials of brentuximab vedotin in early-stage Hodgkin lymphoma have been initiated. Additionally, biomarker-based treatment de-escalation might be a possible route for future improvements. The challenge for future clinical research in early-stage Hodgkin lymphoma is to continue to cure the majority of patients with first-line treatment while reducing long-term toxicity. New strategies to achieve that goal are currently being developed and will further refine treatment of early-stage Hodgkin lymphoma.
Strategies for Providing Low-Cost Water Immersion Therapy With Limited Resources.
Brickhouse, Brenda; Isaacs, Christine; Batten, Meghann; Price, Amber
At our university-affiliated medical center, a major renovation of the women's health and birthing unit resulted in the temporary loss of the permanent tub used for water immersion therapy during labor. Because 40 percent of the women in the nurse-midwifery practice utilize hydrotherapy, we undertook a rigorous search for an interim solution. We developed a safe and cost-effective strategy that can be easily replicated and utilized by others to provide hydrotherapy for laboring women. © 2015 AWHONN.
40 CFR 86.1810-01 - General standards; increase in emissions; unsafe conditions; waivers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 2 and interim non-Tier 2 ethanol fueled vehicles. (a) Any device, system or element of design... “lean-on-cruise” strategies are incorporated into the vehicle design. A “lean-on-cruise” air-fuel... standard. The Administrator may require the manufacturer to provide comparative test data which clearly...
Baltimore Community Schools: Promise & Progress
ERIC Educational Resources Information Center
Durham, Rachel E.; Connolly, Faith
2016-01-01
This report documents the interim progress of the Baltimore Community School (CommSch) strategy by examining outcomes for the 2014-15 school year. Results show that CommSch parents more often reported being connected with community resources by school staff compared to parents at other schools. They also were more likely to report that school…
ERIC Educational Resources Information Center
O'Regan, Fred; Conway, Maureen
The Aspen Institute's ongoing action-research program, Local Employment Approaches for the Disadvantaged (LEAD), assessed 60 programs nationally. Local initiatives fell into four general categories, with numerous subcategories: self-employment, job training and placement, job creation and retention, and community-based finance. A second breakdown…
Introduction
The National Children's Study (NCS) is an ambitious undertaking: a 20-year prospective cohort
study that will investigate the relationships between a broad range of environmental factors and the health
and well-being of children. Approximately 10...
Progress Report 2013. Turnaround Arts Initiative
ERIC Educational Resources Information Center
Stoelinga, Sara Ray; Joyce, Katie; Silk, Yael
2013-01-01
This interim progress report provides a look at Turnaround Arts schools in their first year, including: (1) a summary of the evaluation design and research questions; (2) a preliminary description of strategies used to introduce the arts in Turnaround Arts schools; and (3) a summary of school reform indicators and student achievement data at…
Airland Battle and SOF: A Proposal for an Interim Doctrine for Joint Special Operations
1989-05-19
of having to expand forces and create a viable command, control, communications and intelligence (C31) framework while at 3 the same time developing ... technology , not doctrine, and force development and training that is still driven by the parochial differences between service components. This study does...Fondacaro, USA, 51 pages. This study offers the Aimy’s AirLand Battle doctrine as an interim doctrine for SOFgemployment pending the develop - ment of
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
..., Implementing, Maintaining, and Enforcing Institutional Controls at Contaminated Sites AGENCY: Environmental... stakeholder input regarding the issues addressed in the EPA interim final guidance, titled Institutional Controls: A Guide to Planning, Implementing, Maintaining, and Enforcing Institutional Controls at...
Prosthodontic Rehabilitation of Patients with Bell's Palsy: Our Experience.
Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar
2015-01-01
Bell's palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell's palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell's palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8(th) week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell's palsy.
Prosthodontic Rehabilitation of Patients with Bell’s Palsy: Our Experience
Rajapur, Anand; Mitra, Nirban; Prakash, V Jeevan; Rah, Sajad Ahmad; Thumar, Sagar
2015-01-01
Bell’s palsy is an idiopathic unilateral lower motor neuron paresis or paralysis of the facial nerve of sudden onset. It involves loss of muscular control on the affected side of the face. This paper reports the prosthodontic management of patients with Bell’s palsy and also describes a technique to stabilize the jaw movements in complete denture patients using interim dentures. A 65-year-old male edentulous patient and a 55-year-old female edentulous patient reported to the department of prosthodontics to get their missing teeth replaced. They both gave history of facial paralysis and were diagnosed for Bell’s palsy. Interim training dentures with flat occlusal tables were fabricated first to correct and stabilize their mandibular movements. During initial 4 weeks, there was poor functioning of the interim dentures. Gradually by 8th week the patients started stabilizing the interim dentures and were functional. After observing the improvement when the patients had no pain and could stabilize and use the treatment dentures successfully, definitive complete dentures were fabricated. This case report presents a systematic approach to successively rehabilitate edentulous patients with Bell’s palsy. PMID:26668488
Ganeshan, B; Miles, K A; Babikir, S; Shortman, R; Afaq, A; Ardeshna, K M; Groves, A M; Kayani, I
2017-03-01
The purpose of this study was to investigate the ability of computed tomography texture analysis (CTTA) to provide additional prognostic information in patients with Hodgkin's lymphoma (HL) and high-grade non-Hodgkin's lymphoma (NHL). This retrospective, pilot-study approved by the IRB comprised 45 lymphoma patients undergoing routine 18F-FDG-PET-CT. Progression-free survival (PFS) was determined from clinical follow-up (mean-duration: 40 months; range: 10-62 months). Non-contrast-enhanced low-dose CT images were submitted to CTTA comprising image filtration to highlight features of different sizes followed by histogram-analysis using kurtosis. Prognostic value of CTTA was compared to PET FDG-uptake value, tumour-stage, tumour-bulk, lymphoma-type, treatment-regime, and interim FDG-PET (iPET) status using Kaplan-Meier analysis. Cox regression analysis determined the independence of significantly prognostic imaging and clinical features. A total of 27 patients had aggressive NHL and 18 had HL. Mean PFS was 48.5 months. There was no significant difference in pre-treatment CTTA between the lymphoma sub-types. Kaplan-Meier analysis found pre-treatment CTTA (medium feature scale, p=0.010) and iPET status (p<0.001) to be significant predictors of PFS. Cox analysis revealed that an interaction between pre-treatment CTTA and iPET status was the only independent predictor of PFS (HR: 25.5, 95% CI: 5.4-120, p<0.001). Specifically, pre-treatment CTTA risk stratified patients with negative iPET. CTTA can potentially provide prognostic information complementary to iPET for patients with HL and aggressive NHL. • CT texture-analysis (CTTA) provides prognostic information complementary to interim FDG-PET in Lymphoma. • Pre-treatment CTTA and interim PET status were significant predictors of progression-free survival. • Patients with negative interim PET could be further stratified by pre-treatment CTTA. • Provide precision surveillance where additional imaging reserved for patients at greatest recurrence-risk. • Assists in risk-adapted treatment strategy based on interim PET and CTTA.
Safe medication management in specialized home healthcare - an observational study.
Lindblad, Marléne; Flink, Maria; Ekstedt, Mirjam
2017-08-24
Medication management is a complex, error-prone process. The aim of this study was to explore what constitutes the complexity of the medication management process (MMP) in specialized home healthcare and how healthcare professionals handle this complexity. The study is theoretically based in resilience engineering. Data were collected during the MMP at three specialized home healthcare units in Sweden using two strategies: observation of workplaces and shadowing RNs in everyday work, including interviews. Transcribed material was analysed using grounded theory. The MMP in home healthcare was dynamic and complex with unclear boundaries of responsibilities, inadequate information systems and fluctuating work conditions. Healthcare professionals adapted their everyday clinical work by sharing responsibility and simultaneously being authoritative and preserving patients' active participation, autonomy and integrity. To promote a safe MMP, healthcare professionals constantly re-prioritized goals, handled gaps in communication and information transmission at a distance by creating new bridging solutions. Trade-offs and workarounds were necessary elements, but also posed a threat to patient safety, as these interim solutions were not systematically evaluated or devised learning strategies. To manage a safe medication process in home healthcare, healthcare professionals need to adapt to fluctuating conditions and create bridging strategies through multiple parallel activities distributed over time, space and actors. The healthcare professionals' strategies could be integrated in continuous learning, while preserving boundaries of safety, instead of being more or less interim solutions. Patients' and family caregivers' as active partners in the MMP may be an underestimated resource for a resilient home healthcare.
A two-stage patient enrichment adaptive design in phase II oncology trials.
Song, James X
2014-01-01
Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2014 CFR
2014-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
40 CFR 799.9620 - TSCA neurotoxicity screening battery.
Code of Federal Regulations, 2013 CFR
2013-07-01
... dose and control group for behavioral testing. At least five males and five females should be used in each dose and control group for terminal neuropathology. If interim neuropathological evaluations are... of the study. Animals shall be randomly assigned to treatment and control groups. (3) Control groups...
Overview
The goal of the National Children's Study (NCS) is to collect information on environmental and
social factors in the lives of children, starting before birth and continuing until age 21, to inform
researchers about their effects on the health and dev...
Nutrient Control Design Manual–State of the Technology Review Report
This EPA document is an interim product in the development of revised design guidance for nitrogen and phosphorus control at municipal WWTPs. This document presents findings from an extensive review of nitrogen and phosphorus control technologies and techniques currently applied...
Analysis of Transportation Options for Commercial Spent Fuel in the U.S.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kalinina, Elena; Busch, Ingrid Karin
The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
40 CFR 52.134 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...
Code of Federal Regulations, 2013 CFR
2013-07-01
... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...
Code of Federal Regulations, 2012 CFR
2012-07-01
... with the manufacturer's instructions. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...
NASA Technical Reports Server (NTRS)
Li, Rongsheng (Inventor); Kurland, Jeffrey A. (Inventor); Dawson, Alec M. (Inventor); Wu, Yeong-Wei A. (Inventor); Uetrecht, David S. (Inventor)
2004-01-01
Methods and structures are provided that enhance attitude control during gyroscope substitutions by insuring that a spacecraft's attitude control system does not drive its absolute-attitude sensors out of their capture ranges. In a method embodiment, an operational process-noise covariance Q of a Kalman filter is temporarily replaced with a substantially greater interim process-noise covariance Q. This replacement increases the weight given to the most recent attitude measurements and hastens the reduction of attitude errors and gyroscope bias errors. The error effect of the substituted gyroscopes is reduced and the absolute-attitude sensors are not driven out of their capture range. In another method embodiment, this replacement is preceded by the temporary replacement of an operational measurement-noise variance R with a substantially larger interim measurement-noise variance R to reduce transients during the gyroscope substitutions.
40 CFR 52.2223 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... interim emission limitations on the date prescribed in the Tennessee air pollution control regulation... not meeting the requirements of Subpart N of this chapter. All regulations cited are air pollution control regulations of the State or those of a local air pollution control agency as noted. (1) State...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
... Determination To Stay Sanctions, Imperial County Air Pollution Control District AGENCY: Environmental Protection... imposition of sanctions based on a proposed approval of revisions to the Imperial County Air Pollution... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...
Cumming, Jacqueline; Mays, Nicholas; Gribben, Barry
2008-11-06
In 2001, the New Zealand government introduced its Primary Health Care Strategy (PHCS), aimed at strengthening the role of primary health care, in order to improve health and to reduce inequalities in health. As part of the Strategy, new funding was provided to reduce the fees that patients pay when they use primary health care services in New Zealand, to improve access to services and to increase service use. In this article, we estimate the impact of the new funding on general practitioner and practice nurse visit fees paid by patients and on consultation rates. The analyses involved before-and-after monitoring of fees and consultation rates in a random sample of 99 general practices and covered the period from June 2001 (pre-Strategy) to mid-2005. Fees fell particularly in Access (higher need, higher per capita funded) practices over time for doctor and nurse visits. Fees increased over time for many in Interim (lower need, lower per capita funded) practices, but they fell for patients aged 65 years and over as new funding was provided for this age group. There were increases in consultation rates across almost all age, funding model (Access or Interim), socio-demographic and ethnic groups. Increases were particularly high in Access practices. The Strategy has resulted in lower fees for primary health care for many New Zealanders, and consultation rates have also increased over the past few years. However, fees have not fallen by as much as expected in government policy given the amount of extra public money spent since there are limited requirements for practices to reduce patients' fees in line with increases in public funding for primary care.
Cumming, Jacqueline; Mays, Nicholas; Gribben, Barry
2008-01-01
Background In 2001, the New Zealand government introduced its Primary Health Care Strategy (PHCS), aimed at strengthening the role of primary health care, in order to improve health and to reduce inequalities in health. As part of the Strategy, new funding was provided to reduce the fees that patients pay when they use primary health care services in New Zealand, to improve access to services and to increase service use. In this article, we estimate the impact of the new funding on general practitioner and practice nurse visit fees paid by patients and on consultation rates. The analyses involved before-and-after monitoring of fees and consultation rates in a random sample of 99 general practices and covered the period from June 2001 (pre-Strategy) to mid-2005. Results Fees fell particularly in Access (higher need, higher per capita funded) practices over time for doctor and nurse visits. Fees increased over time for many in Interim (lower need, lower per capita funded) practices, but they fell for patients aged 65 years and over as new funding was provided for this age group. There were increases in consultation rates across almost all age, funding model (Access or Interim), socio-demographic and ethnic groups. Increases were particularly high in Access practices. Conclusion The Strategy has resulted in lower fees for primary health care for many New Zealanders, and consultation rates have also increased over the past few years. However, fees have not fallen by as much as expected in government policy given the amount of extra public money spent since there are limited requirements for practices to reduce patients' fees in line with increases in public funding for primary care. PMID:18990236
KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan
NASA Technical Reports Server (NTRS)
Starr, A. Scott; Applegate, Joe
2014-01-01
This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.
1997-07-07
On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.
76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2010 CFR
2010-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
40 CFR 80.141 - Interim detergent gasoline program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... Valley Unified Air Pollution Control District (SJVUAPCD or District) portion of the California State...), we finalized a limited approval and limited disapproval of San Joaquin Valley Unified Air Pollution...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-12
... Determination to Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...
40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., or detergent-additized post-refinery component satisfied relevant requirements when it left their... detergent satisfied all relevant requirements when it left the detergent manufacturer's control; and (B... manufactured. (2) The test results must accurately establish that, when it left the manufacturer's control, the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...
Andrade, Verónica; Martínez, Alejandra; Rojas, Ninón; Bello-Toledo, Helia; Flores, Paulo; Sánchez-Sanhueza, Gabriela; Catalán, Alfonso
2018-05-01
Interim restorations are occasionally left in the mouth for extended periods and are susceptible to bacterial infiltration. Thus, dental interim cements with antibacterial properties are required. The purpose of this in vitro study was to determine in vitro antibacterial activity against Streptococcus mutans and to compare the diametrical tensile strength (DTSs) of dental interim cement modified with zinc oxide nanoparticles (ZnO-NPs) with that of cement modified with terpenes. Antibacterial properties of ZnO-NPs, terpenes, and dental interim cement modified with ZnO-NPs and cement modified with terpenes against S mutans were tested according to minimum inhibitory concentration (MIC) and direct contact inhibition (DCI). Tensile strength levels were evaluated using DTS. Results were analyzed using the Kolmogorov-Smirnov, ANOVA, and Tamhane tests (α=.05). The MICs of ZnO-NPs and terpenes against S mutans were 61.94 μg/g and 0.25% v/v, respectively. The DCI assay under the cylinders of cement (area of contact with the agar surface) revealed significant bacterial growth inhibition on Temp-Bond NE specimens with ZnO-NPs at MIC of 495.2 μg/g (8× MIC) and with terpenes at MIC 0.999% v/v (4× MIC) (P<.05). The Temp-Bond NE cement cylinder (control group) showed the lowest DTS (1.05 ±0.27 MPa) of all other test groups. In the Zn-NPs group, the greatest increase occurred in the NP8 (8× MIC; 495.2 μg/g) group with a value of 1.50 ±0.23 MPa, a significant increase in DTS compared with the control and terpene groups (P<.05). In the terpene group, the highest increase corresponded to group T2 (2× MIC; 0.4995% v/v) with a value of 1.29 ±0.18 MPa. The addition of terpenes and ZnO-NPs to interim cement showed antibacterial activity when in contact with S. mutans ATCC 25175. Both terpenes and ZnO-NPs antimicrobial agents increased diametral tensile strength. Copyright © 2017 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Code of Federal Regulations, 2010 CFR
2010-07-01
... with none of the air leaking past it. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...
Code of Federal Regulations, 2011 CFR
2011-07-01
... with none of the air leaking past it. Interim controls means a set of measures designed to temporarily... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT LEAD-BASED... disposable cleaning cloths with the card, whether post-renovation cleaning has been properly completed...
ERIC Educational Resources Information Center
Rosow, Jerome M.; Zager, Robert
This volume, Interim Report No. 3 in a 3-year study, considers literacy programs designed to qualify employees for promotions or professional advancement. It adopts a multidimensional definition of moving ahead, one that extends to monetary rewards, career development, and employment security. The volume is divided into two parts: report and case…
Castelnuovo, Gianluca; Manzoni, Gian Mauro; Cuzziol, Paola; Cesa, Gian Luca; Corti, Stefania; Tuzzi, Cristina; Villa, Valentina; Liuzzi, Antonio; Petroni, Maria Letizia; Molinari, Enrico
2011-03-04
Obesity increases the risk of many health complications such as hypertension, coronary heart disease and type 2 diabetes, needs long-lasting treatment for effective results and involves high public and private care-costs. Therefore, it is imperative that enduring and low-cost clinical programs for obesity and related co-morbidities are developed and evaluated. Information and communication technologies (ICT) can help clinicians to deliver treatment in a cost-effective and time-saving manner to a large number of obese individuals with co-morbidities. To examine ad interim effectiveness of a 12-month multidisciplinary telecare intervention for weight loss provided to obese patients with type 2 diabetes. A single-center randomized controlled trial (TECNOB study) started in December 2008. At present, 72 obese patients with type 2 diabetes have been recruited and randomly allocated to the TECNOB program (n=37) or to a control condition (n=39). However, only 34 participants have completed at least the 3-month follow-up and have been included in this ad interim analysis. 21 out of them have reached also the 6-month follow-up and 13 have achieved the end of the program. Study is still on-going. All participants attended 1-month inpatient intensive program that involved individualized medical care, diet therapy, physical training and brief psychological counseling. At discharge, participants allocated to the TECNOB program were instructed to use a weight-loss web-site, a web-based videoconference tool, a dietary software installed into their cellular phones and an electronic armband measuring daily steps and energy expenditure. Weight and disordered eating-related behaviors and cognitions (EDI-2) at entry to hospital, at discharge from hospital, at 3,6 and 12 months. Ad interim analysis of data from 34 participants showed no statistically significant difference between groups in weight change at any time-point. However, within-group analysis revealed significant reductions of initial weight at discharge from hospital, at 3 months, at 6 months but not at 12 months. Control group had higher scores in Interpersonal distrust at 12 months. This ad interim findings revealed that the effect of the inpatient treatment was high and probably overwhelmed the effect of the TECNOB intervention. Much statistical power and long-term follow-up may enhance the probability to detect the TECNOB effect over and above the great one exerted by the inpatient program.
Effects of Solar Array Shadowing on the Power Capability of the Interim Control Module
NASA Technical Reports Server (NTRS)
Fincannon, James; Hojnicki, Jeffrey S.; Garner, James Christopher
1999-01-01
The Interim Control Module (ICM) is being built by the US Naval Research Laboratory (NRL) for NASA as a propulsion module for the International Space Station (ISS). Originally developed as a spinning spacecraft used to move payloads to their final orbit, for ISS, the ICM will be in a fixed orientation and location for long periods resulting in substantial solar panel shadowing. This paper describes the methods used to determine the incident energy incident energy on the ICM solar panels and the power capability of the electric power system (EPS). Applying this methodology has resulted in analyses and assessments used to identify ICM early design changes/options, placement and orientations that enable successful operation of the EPS under a wide variety of anticipated conditions.
77 FR 3559 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
..., which is typical of an approach enabled by more sophisticated electronic controls. Id. The interim final... and long- time automatic defrost or variable defrost control and adjust the default values of maximum... accurate measurement of the energy use of products with variable defrost control. DATES: The amendments are...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-28
... Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District, CA AGENCY... limited approval and limited disapproval of revisions to the San Joaquin Valley Unified Air Pollution... section 307(b)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental regulations...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoke, Anderson F.; Nelson, Austin A.; Tan, Jin
This interim report describes research related to frequency-watt control of solar photovoltaic (PV) inverters conducted under the U.S. Department of Energy's Grid Modernization Laboratory Consortium (GMLC) by a regional partnership for Hawaii. The purpose of this report is to inform an ongoing discussion around frequency-watt control activation in Hawaii.
HARD CHROME POLLUTION PREVENTION DEMONSTRATION PROJECT - INTERIM REPORT
In the project, five chromium emission prevention/control devices were tested tha cover the spectrum of prevention/control techniques currently in use in small- and large-size hard chromium electroplating job shops. The Project results show that some of the tested devices had ch...
40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2014 CFR
2014-07-01
... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK... to plastic fuel tanks in § 1048.245(e)(1)(i) and § 1048.501(e). [67 FR 68347, Nov. 8, 2002, as...
DOT National Transportation Integrated Search
1972-04-01
This project is aimed at determining the effectiveness of variable message signs in controlling traffic on an Interstate highway during periods of hazardous driving conditions such as fog, vehicle accidents, or congestion. : The effectiveness of the ...
40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2011 CFR
2011-07-01
... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK... to plastic fuel tanks in § 1048.245(e)(1)(i) and § 1048.501(e). [67 FR 68347, Nov. 8, 2002, as...
40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2010 CFR
2010-07-01
... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK... to plastic fuel tanks in § 1048.245(e)(1)(i) and § 1048.501(e). [67 FR 68347, Nov. 8, 2002, as...
CONTROL OF MERCURY EMISSIONS FROM COAL-FIRED ELECTRIC UTILITY BOILERS: INTERIM REPORT
The report provides additional information on mercury (Hg) emissions control following the release of "Study of Hazardous Air Pollutant Emissions from Electric Utility Steam Generating Units--Final Report to Congress" in February 1998. Chapters 1-3 describe EPA's December 2000 de...
40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2012 CFR
2012-07-01
... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK... to plastic fuel tanks in § 1048.245(e)(1)(i) and § 1048.501(e). [67 FR 68347, Nov. 8, 2002, as...
40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?
Code of Federal Regulations, 2013 CFR
2013-07-01
... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK... to plastic fuel tanks in § 1048.245(e)(1)(i) and § 1048.501(e). [67 FR 68347, Nov. 8, 2002, as...
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE; ORNL; NREL
1999-10-15
The Diesel Emission Control-Sulfur Effects (DECSE) is a joint government/industry program to determine the impact of diesel fuel sulfur levels on emission control systems whose use could lower emissions of nitrogen oxides (NOx) and particulate matter (PM) from on-highway trucks in the 2002--2004 model years. Phase 1 of the program was developed with the following objectives in mind: (1) evaluate the effects of varying the level of sulfur content in the fuel on the emission reduction performance of four emission control technologies; and (2) measure and compare the effects of up to 250 hours of aging on selected devices formore » multiple levels of fuel sulfur content. This interim report discusses the results of the DECSE test program that demonstrates the potential of NOx adsorber catalyst technology across the range of diesel engine operation with a fuel economy penalty less than 4%.« less
Interim Cryogenic Propulsion Stage (ICPS) Handover Signing
2017-10-26
Meeting in the Launch Control Center of NASA's Kennedy Space Center in Florida, officials of the agency's Spacecraft/Payload Integration and Evolution (SPIE) organization formally turn over processing of the Space Launch System (SLS) rocket's Interim Cryogenic Propulsion Stage (ICPS) to the center's Ground Systems Development and Operations (GSDO) directorate. The ICPS is the first integrated piece of flight hardware to arrive in preparation for the uncrewed Exploration Mission-1. With the Orion attached, the ICPS sits atop the SLS rocket and will provide the spacecraft with the additional thrust needed to travel tens of thousands of miles beyond the Moon.
Source attribution and mitigation strategies for air pollution in Delhi
NASA Astrophysics Data System (ADS)
Kiesewetter, Gregor; Purohit, Pallav; Schoepp, Wolfgang; Liu, Jun; Amann, Markus; Bhanarkar, Anil
2017-04-01
Indian cities, and the megacity of Delhi in particular, have suffered from high air pollution for years. Recent observations show that ambient concentrations of fine particulate matter (PM2.5) in Delhi strongly exceed the Indian national ambient air quality standards as well as the World Health Organization's interim target levels. At the same time, India is experiencing strong urbanization, and both Delhi's emissions as well as the exposed population are growing. Therefore the question arises how PM2.5 concentrations will evolve in the future, and how they can be improved efficiently. In the past, typical responses of the Delhi government to high pollution episodes have been restrictions on motorized road traffic, on power plant operations and on construction activities. However, to design sustainable and efficient pollution mitigation measures, the contribution of different source sectors and spatial scales needs to be quantified. Here we combine the established emission calculation scheme of the Greenhouse Gas - Air Pollution Interactions and Synergies (GAINS) model with regional chemistry-transport model simulations (0.5° resolution) as well as local particle dispersion (2 × 2 km resolution) to arrive at a source attribution of ambient PM2.5 in Delhi. Calculated concentrations compare well to observations. We find that roughly 60% of total population-weighted PM2.5 originates from sources outside the national capital territory of Delhi itself. Consequently, mitigation strategies need to involve neighboring states and address the typical sources there. We discuss the likely evolution of ambient concentrations under different scenarios which assume either current emission control legislation, or application of a Clean Air Scenario foreseeing additional regulations in non-industrial sectors which are often overlooked, such as phase-out of solid fuel cookstoves, and road paving. Only in the case where the Clean Air Scenario is applied both in Delhi as well as in surrounding states, a strong reduction in ambient concentrations is envisaged which would bring PM2.5 levels close to the WHO interim targets.
Improving Science Achievement and Attitudes of Students With and Without Learning Disabilities
NASA Astrophysics Data System (ADS)
Sanders-White, Pamela
The primary purpose of this study was to investigate the effect of structured note-taking compared to traditional note-taking on the acquisition of scientific knowledge for students with and without learning disabilities (LD) and students with reading difficulties (RD). An additional purpose was to examine whether the two note-taking methods affected students' attitudes toward science. The sample population consisted of 203 fifth grade students across four public schools in the southern area of the United States. A standardized instrument aligned to Florida's science standards was used to measure the acquisition of scientific knowledge and the Test of Science-Related Attitudes (TOSRA) was used to measure seven distinct science-related attitudes. For meaningful analyses, students with LD and students with RD were collapsed to form a single group due to the small numbers of participants in each of the subgroups; the collapsed group was referred to as "low achievers." A three-way repeated measures ANOVA was conducted to determine the effects of the pretest-posttest Science Interim assessment by group, type of student, and gender. The pretest-posttest Science Interim assessment scores were the within-group factor, while group, type of student, and gender were the between-groups factors. Results revealed that there was a significant interaction between the pretest-posttest Science Interim assessment and group, F(1, 191) = 9.320, p = .003, indicating that scientific knowledge scores increased for the experimental group, but decreased for the control group. Results also indicated that there was a significant three-way interaction between the pretest-posttest Science Interim assessment, group, and gender, F(1, 191) = 5.197, p = .024, showing that all participants in the experimental group improved their scores; while in the control group, female scores decreased and male scores increased. Participants in the experimental and control groups did not show improved attitudes toward science, as measured by the pretest-posttest TOSRA constructs.
Nusinersen versus Sham Control in Infantile-Onset Spinal Muscular Atrophy.
Finkel, Richard S; Mercuri, Eugenio; Darras, Basil T; Connolly, Anne M; Kuntz, Nancy L; Kirschner, Janbernd; Chiriboga, Claudia A; Saito, Kayoko; Servais, Laurent; Tizzano, Eduardo; Topaloglu, Haluk; Tulinius, Már; Montes, Jacqueline; Glanzman, Allan M; Bishop, Kathie; Zhong, Z John; Gheuens, Sarah; Bennett, C Frank; Schneider, Eugene; Farwell, Wildon; De Vivo, Darryl C
2017-11-02
Spinal muscular atrophy is an autosomal recessive neuromuscular disorder that is caused by an insufficient level of survival motor neuron (SMN) protein. Nusinersen is an antisense oligonucleotide drug that modifies pre-messenger RNA splicing of the SMN2 gene and thus promotes increased production of full-length SMN protein. We conducted a randomized, double-blind, sham-controlled, phase 3 efficacy and safety trial of nusinersen in infants with spinal muscular atrophy. The primary end points were a motor-milestone response (defined according to results on the Hammersmith Infant Neurological Examination) and event-free survival (time to death or the use of permanent assisted ventilation). Secondary end points included overall survival and subgroup analyses of event-free survival according to disease duration at screening. Only the first primary end point was tested in a prespecified interim analysis. To control the overall type I error rate at 0.05, a hierarchical testing strategy was used for the second primary end point and the secondary end points in the final analysis. In the interim analysis, a significantly higher percentage of infants in the nusinersen group than in the control group had a motor-milestone response (21 of 51 infants [41%] vs. 0 of 27 [0%], P<0.001), and this result prompted early termination of the trial. In the final analysis, a significantly higher percentage of infants in the nusinersen group than in the control group had a motor-milestone response (37 of 73 infants [51%] vs. 0 of 37 [0%]), and the likelihood of event-free survival was higher in the nusinersen group than in the control group (hazard ratio for death or the use of permanent assisted ventilation, 0.53; P=0.005). The likelihood of overall survival was higher in the nusinersen group than in the control group (hazard ratio for death, 0.37; P=0.004), and infants with a shorter disease duration at screening were more likely than those with a longer disease duration to benefit from nusinersen. The incidence and severity of adverse events were similar in the two groups. Among infants with spinal muscular atrophy, those who received nusinersen were more likely to be alive and have improvements in motor function than those in the control group. Early treatment may be necessary to maximize the benefit of the drug. (Funded by Biogen and Ionis Pharmaceuticals; ENDEAR ClinicalTrials.gov number, NCT02193074 .).
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...
Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976,
1977-04-01
Systems Center. AD-733-763 Judith Gertler, Herbert Glynn, Vivian Hobbs, Frederick Interim Report. June 1971. 16p. Woolfall. AD-733-764 Air Traffic Control...of Deployment Cost Analysis .. .......... FAA-76-20 Airspace Control Environmnent Simulator - Final Report.... ............ .. TSC-131.3 *All- Wether
Levin, Bruce; Thompson, John L P; Chakraborty, Bibhas; Levy, Gilberto; MacArthur, Robert; Haley, E Clarke
2011-08-01
TNK-S2B, an innovative, randomized, seamless phase II/III trial of tenecteplase versus rt-PA for acute ischemic stroke, terminated for slow enrollment before regulatory approval of use of phase II patients in phase III. (1) To review the trial design and comprehensive type I error rate simulations and (2) to discuss issues raised during regulatory review, to facilitate future approval of similar designs. In phase II, an early (24-h) outcome and adaptive sequential procedure selected one of three tenecteplase doses for phase III comparison with rt-PA. Decision rules comparing this dose to rt-PA would cause stopping for futility at phase II end, or continuation to phase III. Phase III incorporated two co-primary hypotheses, allowing for a treatment effect at either end of the trichotomized Rankin scale. Assuming no early termination, four interim analyses and one final analysis of 1908 patients provided an experiment-wise type I error rate of <0.05. Over 1,000 distribution scenarios, each involving 40,000 replications, the maximum type I error in phase III was 0.038. Inflation from the dose selection was more than offset by the one-half continuity correction in the test statistics. Inflation from repeated interim analyses was more than offset by the reduction from the clinical stopping rules for futility at the first interim analysis. Design complexity and evolving regulatory requirements lengthened the review process. (1) The design was innovative and efficient. Per protocol, type I error was well controlled for the co-primary phase III hypothesis tests, and experiment-wise. (2a) Time must be allowed for communications with regulatory reviewers from first design stages. (2b) Adequate type I error control must be demonstrated. (2c) Greater clarity is needed on (i) whether this includes demonstration of type I error control if the protocol is violated and (ii) whether simulations of type I error control are acceptable. (2d) Regulatory agency concerns that protocols for futility stopping may not be followed may be allayed by submitting interim analysis results to them as these analyses occur.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Halasz, Lia M.; Jacene, Heather A.; Catalano, Paul J.
2012-08-01
Purpose: To evaluate outcomes of patients treated for aggressive non-Hodgkin lymphoma (NHL) with combined modality therapy based on [{sup 18}F]fluoro-2-deoxy-2-D-glucose positron emission tomography (FDG-PET) response. Methods and Materials: We studied 59 patients with aggressive NHL, who received chemotherapy and radiation therapy (RT) from 2001 to 2008. Among them, 83% of patients had stage I/II disease. Patients with B-cell lymphoma received R-CHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone)-based chemotherapy, and 1 patient with anaplastic lymphoma kinase-negative anaplastic T-cell lymphoma received CHOP therapy. Interim and postchemotherapy FDG-PET or FDG-PET/computed tomography (CT) scans were performed for restaging. All patients received consolidated involved-field RT.more » Median RT dose was 36 Gy (range, 28.8-50 Gy). Progression-free survival (PFS) and local control (LC) rates were calculated with and without a negative interim or postchemotherapy FDG-PET scan. Results: Median follow-up was 46.5 months. Thirty-nine patients had negative FDG-PET results by the end of chemotherapy, including 12 patients who had a negative interim FDG-PET scan and no postchemotherapy PET. Twenty patients were FDG-PET-positive, including 7 patients with positive interim FDG-PET and no postchemotherapy FDG-PET scans. The 3-year actuarial PFS rates for patients with negative versus positive FDG-PET scans were 97% and 90%, respectively. The 3-year actuarial LC rates for patients with negative versus positive FDG-PET scans were 100% and 90%, respectively. Conclusions: Patients who had a positive interim or postchemotherapy FDG-PET had a PFS rate of 90% at 3 years after combined modality treatment, suggesting that a large proportion of these patients can be cured with consolidated RT.« less
Factors Influencing Rapid Prototyping Innovation Implementation: A Descriptive Model
1990-03-01
strategy. NDI can be considered as a balance of risk and technological advancement allowing the services to have a system in the field into the...The U.S. military no longer must go through the long, tedious series of events required by the peacetime research and development and service approval...developed, fielded, and evaluated by the fleet in conjunction with fleet introduction (Interim Service Approval). Rapid prototyping conceptually represents
The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voegele, Michael D.; Vieth, Donald
2013-07-01
The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should bemore » implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste legislation to the floor of the Senate, overcoming existing House support for Yucca Mountain; 3. Change the longstanding focus of Congress from disposal to storage; 4. Change the funding concepts embodied in the Nuclear Waste Policy Act to allow the Nuclear Waste fund to be used to pay for interim storage; 5. Reverse the Congressional policy not to give states or tribes veto or consent authority, and to reserve to Congress the authority to override a state or tribal disapproval; 6. Promulgate interim storage facility siting regulations to reflect the new policies after such changes to policy and law; 7. Complete already underway changes to storage and transportation regulations, possibly incorporating changes to reflect changes to waste disposal law; 8. Promulgate new repository siting regulations if the interim storage facility is to support repository development; 9. Identify volunteer sites, negotiate agreements, and get Congressional approval for negotiated benefits packages; 10. Design, License and develop the interim storage facility. The time required to accomplish these ten items depends on many factors. The estimate developed assumes that certain of the items must be completed before other items are started; given past criticisms of the current program, such an assumption appears appropriate. Estimated times for completion of individual items are based on historical precedent. (authors)« less
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
5 CFR 772.102 - Interim personnel actions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
14 CFR 171.267 - Glide path automatic monitor system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... control points when any of the following occurs: (1) A shift of the mean ISMLS glide path angle equivalent... TRANSPORTATION (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave...
Rampy, L. W.; Quast, J. F.; Humiston, C. G.; Balmer, M. F.; Schwetz, B. A.
1977-01-01
Male and female Sprague-Dawley rats were exposed to vinylidene chloride (VDC) orally or by inhalation in 2-year toxicological studies. Interim results are included in this report. VDC was given in the drinking water at mean ± S.D. concentrations of 0, 68 ± 13, 106 ± 22, and 220 ± 35 ppm which produced mean ± S.D. dosage levels of 0, 5.9 ± 0.6, 10.0 ± 1.2, and 19.3 ± 2.7 mg/kg for male rats and 0, 7.5 ± 0.4, 12.6 ± 1.1, and 25.6 ± 2.4 mg/kg for female rats. Forty-eight rats/sex/VDC level and 80 rats/sex in the control group were used in the 2-year study with an interim kill of an additional 10 rats/sex/level at 90 days. In the inhalation study, rats were exposed to 0, 10, or 40 ppm of VDC vapor 6 hr/day, 5 days/week for 5 weeks, after which the exposure levels were changed to 0, 25, and 75 ppm of VDC. Exposure continued for a total of 18 months and the rats held for observation an additional 6 months. Interim kills occurred at 1, 6 and 12 months. A separate 90-day study using 20 rats/sex/level was conducted at 0, 25, and 75 ppm of VDC vapor. There were 86 rats/sex/level in the 2-year portion of the study. The parameters monitored were: body weight, food and water consumption (drinking water study only), hematology, clinical chemistries, cytogentics of bone marrow cells (inhalation study only), mortality, terminal organ weights, and gross and histopathology. Based on interim kills and gross pathologic observations, the main conclusions are: increased cytoplasmic vacuolation of hepatocytes was seen in the livers of rats given 200 ppm VDC in drinking water or 25 or 75 ppm VDC vapor by inhalation; based on gross tumor count, tumor incidence in VDC-exposed rats was not greater than controls. PMID:612457
ERIC Educational Resources Information Center
Anyaso, Hilary Hurd
2009-01-01
The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…
40 CFR 155.56 - Interim registration review decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...
DOT National Transportation Integrated Search
1996-10-01
Certain air traffic control(ATC) centers experienced a series of major outages, : some of which were caused by the Display Channel Complex or DCC-a mainframe : computer system that processes radar and other data into displayable images on : controlle...
Overview of pediatric oncology and hematology in Myanmar
Halbert, Jay; Khaing, Aye Aye
2014-01-01
Myanmar is a country in southeast Asia in political, economic and healthcare transition. There are currently only two pediatric oncology centers serving a population of almost 19 million children. An estimated 85-92% of children with cancer are undiagnosed or not receiving treatment. Abandonment of treatment is as high as 60%. Although a number of chemotherapy agents are available, difficulties remain concerning treatment costs, quality control and the availability of supportive care. Radiotherapy services are also limited and not usually included in pediatric protocols. Healthcare professional training, improved diagnostics, strategies to tackle abandonment of treatment and the development of a parents’ support group are major priorities. Local and international partnerships including a recent partnership with world child cancer are essential in the interim to support the development of pediatric oncology and hematology in Myanmar. A unique opportunity exists to support the development of preventive, diagnostic, curative and palliative care for children's cancer in Myanmar from the outset. PMID:24665454
Overview of pediatric oncology and hematology in Myanmar.
Halbert, Jay; Khaing, Aye Aye
2014-01-01
Myanmar is a country in southeast Asia in political, economic and healthcare transition. There are currently only two pediatric oncology centers serving a population of almost 19 million children. An estimated 85-92% of children with cancer are undiagnosed or not receiving treatment. Abandonment of treatment is as high as 60%. Although a number of chemotherapy agents are available, difficulties remain concerning treatment costs, quality control and the availability of supportive care. Radiotherapy services are also limited and not usually included in pediatric protocols. Healthcare professional training, improved diagnostics, strategies to tackle abandonment of treatment and the development of a parents' support group are major priorities. Local and international partnerships including a recent partnership with world child cancer are essential in the interim to support the development of pediatric oncology and hematology in Myanmar. A unique opportunity exists to support the development of preventive, diagnostic, curative and palliative care for children's cancer in Myanmar from the outset.
IVHS Architecture Development Program, Interim Status Report
DOT National Transportation Integrated Search
1994-04-01
A MAJOR NATIONAL INITIATIVE IS UNDERWAY TO APPLY PROVEN INFORMATION, COMMUNICATIONS AND CONTROL TECHNOLOGIES TO SURFACE TRANSPORTATION TO IMPROVE ITS EFFICIENCY AND REDUCE ITS NEGATIVE IMPACTS. COLLECTIVELY, THESE APPLICATIONS ARE KNOWN AS INTELLIGEN...
2017-03-23
On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.
Maegawa, Hiroshi; Tobe, Kazuyuki; Tabuchi, Hiromi; Nakamura, Ichiro
2016-10-01
To evaluate the efficacy and safety of ipragliflozin in real-world clinical practice in Japanese patients with type 2 diabetes. We conducted interim analyses at 3 months of a 3-year prospective study of patients who were first prescribed ipragliflozin between 17 July 2014 and 16 October 2015, and whose data were locked by 16 January 2016. Changes in glycemic control, blood pressure, and laboratory variables from baseline, and incidence of adverse drug reactions (ADRs). Of 11,412 patients initially registered, efficacy and safety data were available for 3481 (30.5%) and 4360 (38.2%) patients, respectively. Hemoglobin A1c and fasting plasma glucose decreased by 0.67% and 28.8 mg/dL, respectively, at 3 months/last assessment (both P < .001) from baseline (8.00% and 166.4 mg/dL, respectively). Blood pressure and lipid levels also improved significantly. There were 258 ADRs in 194 patients. The ADRs included 'renal and urinary disorders' (system organ class) in 110 patients (2.5%). These 3-month interim results indicate that ipragliflozin improved glycemic control, lipids, and blood pressure with low rates of ADRs in Japanese patients with type 2 diabetes in real-world clinical practice. The results were consistent with those of placebo-controlled, randomized clinical trials. Clinicaltrials.gov identifier: NCT02479399.
17 CFR 210.8-03 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...
7 CFR 1738.21 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...
NASA Human Spaceflight Architecture Team: Lunar Surface Exploration Strategies
NASA Technical Reports Server (NTRS)
Mueller, Rob P.
2012-01-01
NASA s agency wide Human Spaceflight Architecture Team (HAT) has been developing Design Reference Missions (DRMs) to support the ongoing effort to characterize NASA s future human exploration strategy. The DRM design effort includes specific articulations of transportation and surface elements, technologies and operations required to enable future human exploration of various destinations including the moon, Near Earth Asteroids (NEAs) and Mars as well as interim cis-lunar targets. In prior architecture studies, transportation concerns have dominated the analysis. As a result, an effort was made to study the human utilization strategy at each specific destination and the resultant impacts on the overall architecture design. In particular, this paper considers various lunar surface strategies as representative scenarios that could occur in a human lunar return, and demonstrates their alignment with the internationally developed Global Exploration Roadmap (GER).
NASA Astrophysics Data System (ADS)
Byrd, Gene G.; Coleman, Susanna; Werneth, Charles
Our University of Alabama introductory astronomy course has large enrollments, with the usual problems of low attendance and students putting off studying until just before major exams--with predictable consequences. We tried one strategy--cooperatively answering quiz questions--during our May 2002 interim term. Classes were long: three hours a day over three weeks. Before midclass break, we presented a multiple-choice open-book-and-notes quiz to be answered after the break. Quizzes could increase grades without excessively diluting the importance of closed-book major exams. The interim 2002 final exam average was 80%, much better than the 2001 class average of 57%. During a regular semester, handing out and taking up papers would take up much time during the more frequent classes. It's also more interesting if students vote for different answers together, then see the correct answer. We obtained funds for a Classroom Performance System (CPS) consisting of two computer receiver units, a hub, and 128 TV remote-style response pads. We used the CPS during interim 2003. Ease of giving quizzes and grading permitted two shorter quizzes a day. Improvement was maintained, with a slight 3% increase. In addition, students graded the "cooperative quiz" 2002 and 2003 courses higher than the 2001 course. We also used the CPS for public astronomy events and introductory physics courses.
An Approach for Evaluating the Technical Quality of Interim Assessments
ERIC Educational Resources Information Center
Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian
2010-01-01
Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…
47 CFR 51.611 - Interim wholesale rates.
Code of Federal Regulations, 2010 CFR
2010-10-01
... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...
7 CFR 15a.71 - Interim procedures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...
7 CFR 1735.75 - Interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2014 CFR
2014-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2010 CFR
2010-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2013 CFR
2013-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2012 CFR
2012-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
13 CFR 120.890 - Source of interim financing.
Code of Federal Regulations, 2011 CFR
2011-01-01
....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...
Reflective cracking control : interim report - fourth year.
DOT National Transportation Integrated Search
1999-07-01
Reflective cracking has long been considered a major problem associated with asphalt : pavements. Several methods including milling, crack sealing and fabric membranes have : been used in an attempt to eliminate or delay the reflective cracking proce...
40 CFR 57.803 - Issuance of tentative determination; notice.
Code of Federal Regulations, 2013 CFR
2013-07-01
... determination. (1) The EPA staff shall formulate and prepare: (i) A “Staff Computational Analysis,” using the... Computational Analysis, discussing the estimated cost of interim controls, and assessing the effect upon the...
40 CFR 57.803 - Issuance of tentative determination; notice.
Code of Federal Regulations, 2012 CFR
2012-07-01
... determination. (1) The EPA staff shall formulate and prepare: (i) A “Staff Computational Analysis,” using the... Computational Analysis, discussing the estimated cost of interim controls, and assessing the effect upon the...
40 CFR 57.803 - Issuance of tentative determination; notice.
Code of Federal Regulations, 2014 CFR
2014-07-01
... determination. (1) The EPA staff shall formulate and prepare: (i) A “Staff Computational Analysis,” using the... Computational Analysis, discussing the estimated cost of interim controls, and assessing the effect upon the...
40 CFR 57.803 - Issuance of tentative determination; notice.
Code of Federal Regulations, 2011 CFR
2011-07-01
... determination. (1) The EPA staff shall formulate and prepare: (i) A “Staff Computational Analysis,” using the... Computational Analysis, discussing the estimated cost of interim controls, and assessing the effect upon the...
2016 Lake Michigan Lake Trout Working Group Report
Madenjian, Charles P.; Breidert, Brian; Boyarski, David; Bronte, Charles R.; Dickinson, Ben; Donner, Kevin; Ebener, Mark P.; Gordon, Roger; Hanson, Dale; Holey, Mark; Janssen, John; Jonas, Jory; Kornis, Matthew; Olsen, Erik; Robillard, Steve; Treska, Ted; Weldon, Barry; Wright, Greg D.
2017-01-01
This report provides a review on the progression of lake trout rehabilitation towards meeting the Salmonine Fish Community Objectives (FCOs) for Lake Michigan (Eshenroder et. al. 1995) and the interim goal and evaluation objectives articulated in A Fisheries Management Implementation Strategy for the Rehabilitation of Lake Trout in Lake Michigan (Dexter et al. 2011); we also include data describing lake trout stocking and mortality to portray the present state of progress towards lake trout rehabilitation.
12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...
Vigilant Spirit Control Station (VSCS) - The Face of COUNTER
2008-08-01
AFRL-RH-WP-TR-2012-0015 VIGILANT SPIRIT CONTROL STATION ( VSCS ) “THE FACE OF COUNTER” Gregory L. Feitshans, Allen J. Rowe, Jason E...From - To) 01-08-08 Interim 1 JUN 2006 – 1 JUN 2008 4. TITLE AND SUBTITLE VIGILANT SPIRIT CONTROL STATION ( VSCS ) “THE FACE OF COUNTER” 5a...7 4.0 VSCS USER INTERFACE PRIMARY COMPONENTS OVERVIEW
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2013 CFR
2013-04-01
... on the Internet at http://www.hud.gov/offices/lead, or by mail or fax from the HUD Office of Healthy Homes and Lead Hazard Control at (202) 755-1785, extension 104 (this is not a toll-free number). Persons... the toll-free Federal Information Relay Service at (800) 877-8339. (iv) “The Remodeler's and Renovator...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2014 CFR
2014-04-01
... on the Internet at http://www.hud.gov/offices/lead, or by mail or fax from the HUD Office of Healthy Homes and Lead Hazard Control at (202) 755-1785, extension 104 (this is not a toll-free number). Persons... the toll-free Federal Information Relay Service at (800) 877-8339. (iv) “The Remodeler's and Renovator...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
40 CFR 799.9346 - TSCA 90-day inhalation toxicity.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...
76 FR 16525 - Reorganization of Regulations on Control of Employment of Aliens
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
.... 3260-2011] RIN 1125-AA64 Reorganization of Regulations on Control of Employment of Aliens AGENCY... Aliens, 74 FR 2337 (Jan. 15, 2009). The Homeland Security Act of 2002, as amended, transferred the... about employment of aliens in the United States and did not discuss EOIR's interim rule. As neither...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... the interim rule. Contractor business systems and internal controls are the first line of defense... contractor's accounting system shall provide for management reviews or internal audits of the contractor's... controls as part of any evaluation as to the reliability of information produced by a business system(s...
DOT National Transportation Integrated Search
1982-02-01
This interim report presents an annotated bibliography that has been compiled as part of a comprehensive review of the state-of-the-art in the prediction and control of groundborne noise and vibration created by rail transit operations. Included in t...
Graf, Alexandra C; Bauer, Peter; Glimm, Ekkehard; Koenig, Franz
2014-07-01
Sample size modifications in the interim analyses of an adaptive design can inflate the type 1 error rate, if test statistics and critical boundaries are used in the final analysis as if no modification had been made. While this is already true for designs with an overall change of the sample size in a balanced treatment-control comparison, the inflation can be much larger if in addition a modification of allocation ratios is allowed as well. In this paper, we investigate adaptive designs with several treatment arms compared to a single common control group. Regarding modifications, we consider treatment arm selection as well as modifications of overall sample size and allocation ratios. The inflation is quantified for two approaches: a naive procedure that ignores not only all modifications, but also the multiplicity issue arising from the many-to-one comparison, and a Dunnett procedure that ignores modifications, but adjusts for the initially started multiple treatments. The maximum inflation of the type 1 error rate for such types of design can be calculated by searching for the "worst case" scenarios, that are sample size adaptation rules in the interim analysis that lead to the largest conditional type 1 error rate in any point of the sample space. To show the most extreme inflation, we initially assume unconstrained second stage sample size modifications leading to a large inflation of the type 1 error rate. Furthermore, we investigate the inflation when putting constraints on the second stage sample sizes. It turns out that, for example fixing the sample size of the control group, leads to designs controlling the type 1 error rate. © 2014 The Author. Biometrical Journal published by WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-16
... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...
Interim Administrators in Higher Education: A National Study
ERIC Educational Resources Information Center
Huff, Marie Thielke; Neubrander, Judy
2015-01-01
The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…
Archer, Bn; Cohen, C; Naidoo, D; Thomas, J; Makunga, C; Blumberg, L; Venter, M; Timothy, Ga; Puren, A; McAnerney, Jm; Cengimbo, A; Schoub, Bd
2009-10-22
We provide an interim report on pandemic H1N1 influenza activity in South Africa, with a focus on the epidemiology and factors associated with deaths. Following the importation of the virus on 14 July 2009, and the epidemic peak during the week starting 3 August, the incidence in South Africa has declined. A total of 12,331 cases and 91 deaths have been laboratory-confirmed as of 12 October 2009. Age distribution and risk groups were similar to those observed elsewhere. The median age of patients who died (33.5 years) was significantly higher than that of the non-fatal cases (15.0 years, p<0.01). The most common underlying conditions among fatal cases were infection with human immunodeficiency virus (17/32 tested) and pregnancy (25/45 women of reproductive age). Active tuberculosis coinfection was present in seven of 72 fatal cases. These findings should be taken into consideration when planning vaccination strategies for 2010.
Evaluation of the healthy schools program: Part I. Interim progress.
Beam, Margaret; Ehrlich, Ginny; Donze Black, Jessica; Block, Audrey; Leviton, Laura C
2012-01-01
Federal and state policies identify schools as a setting to prevent childhood obesity, but schools need better health-promoting strategies. The objective of this study was to evaluate interim progress in schools receiving hands-on training from the Healthy Schools Program, the nation's largest school-based program aimed at preventing childhood obesity. The 4-year program targets schools with predominantly low-income, African American, or Hispanic students. In 2010 we assessed schools that enrolled in the 2007-2008 and 2008-2009 school years. School representatives completed an inventory of 8 content areas: policy and systems, school meals, competitive foods and beverages, health education, physical education, physical activity outside of physical education, before- and after-school programs, and school employee wellness. Schools' baseline inventory was compared by t test with the most recent inventory available. Schools made significant changes in all content areas, and effect sizes were moderate to large. Participating schools improved environmental policies and practices to prevent childhood obesity. The program is a resource to implement recent federal and state policies.
10 CFR 851.22 - Hazard prevention and abatement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...
10 CFR 851.22 - Hazard prevention and abatement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...
Soil-cement design study : interim report No. 1.
DOT National Transportation Integrated Search
1971-05-01
Soil-cement base course materials design in Louisiana is based upon durability and compressive strength criteria, with the compressive strength requirements being the controlling factor in 95 percent of the designs. The findings to data have provided...
Mixed-mode VLSI optic flow sensors for in-flight control of a micro air vehicle
NASA Astrophysics Data System (ADS)
Barrows, Geoffrey L.; Neely, C.
2000-11-01
NRL is developing compact optic flow sensors for use in a variety of small-scale navigation and collision avoidance tasks. These sensors are being developed for use in micro air vehicles (MAVs), which are autonomous aircraft whose maximum dimension is on the order of 15 cm. To achieve desired weight specifications of 1 - 2 grams, mixed-signal VLSI circuitry is being used to develop compact focal plane sensors that directly compute optic flow. As an interim proof of principle, we have constructed a sensor comprising a focal plane sensor head with on-chip processing and a back-end PIC microcontroller. This interim sensors weighs approximately 25 grams and is able to measure optic flow with real-world and low-contrast textures. Variations of this sensor have been used to control the flight of a glider in real-time to avoid collisions with walls.
Planning for progress, productivity, and performance.
Benedict, J M
1983-10-01
A project is described for the interim renovation of a labor intensive existing foodservice facility. The renovated area will provide effective food management during the hospital's redevelopment period, including a new foodservice. Objectives of the interim project were to conserve labor while emphasizing control and centralization, provide economic foodservices with improved quality, and incorporate one tray distribution system throughout the hospital complex. Immediate measures were necessary in order to generate funds to proceed. Renovations had to occur without disrupting food-service to patients. The project was planned over a three year period and included an ingredient control area, two patient tray service centres, a renewed production kitchen and test kitchen facility. Each phase has been financed on the understanding that the costs of construction and equipment will be repaid within one fiscal year of operating the renovated facility. Positive results are being achieved, attributable to the support and encouragement received from staff during the change process.
NASA Astrophysics Data System (ADS)
Shi, Chunhua; Huang, Ying; Guo, Dong; Zhou, Shunwu; Hu, Kaixi; Liu, Yu
2018-05-01
The South Asian High (SAH) has an important influence on atmospheric circulation and the Asian climate in summer. However, current comparative analyses of the SAH are mostly between reanalysis datasets and there is a lack of sounding data. We therefore compared the climatology, trends and abrupt changes in the SAH in the Japanese 55-year Reanalysis (JRA-55) dataset, the National Centers for Environmental Prediction Climate Forecast System Reanalysis (NCEP-CFSR) dataset, the European Center for Medium-Range Weather Forecasts Reanalysis Interim (ERA-interim) dataset and radiosonde data from China using linear analysis and a sliding t-test. The trends in geopotential height in the control area of the SAH were positive in the JRA-55, NCEP-CFSR and ERA-interim datasets, but negative in the radiosonde data in the time period 1979-2014. The negative trends for the SAH were significant at the 90% confidence level in the radiosonde data from May to September. The positive trends in the NCEP-CFSR dataset were significant at the 90% confidence level in May, July, August and September, but the positive trends in the JRA-55 and ERA-Interim were only significant at the 90% confidence level in September. The reasons for the differences in the trends of the SAH between the radiosonde data and the three reanalysis datasets in the time period 1979-2014 were updates to the sounding systems, changes in instrumentation and improvements in the radiation correction method for calculations around the year 2000. We therefore analyzed the trends in the two time periods of 1979-2000 and 2001-2014 separately. From 1979 to 2000, the negative SAH trends in the radiosonde data mainly agreed with the negative trends in the NCEP-CFSR dataset, but were in contrast with the positive trends in the JRA-55 and ERA-Interim datasets. In 2001-2014, however, the trends in the SAH were positive in all four datasets and most of the trends in the radiosonde and NCEP-CFSR datasets were significant. It is therefore better to use the NCEP-CFSR dataset than the JRA-55 and ERA-Interim datasets when discussing trends in the SAH.
Wheel/Rail Noise and Vibration Control
DOT National Transportation Integrated Search
1974-05-01
Reported here are the interim results of a program under the UMTA Urban Rail Supporting Technology Program to develop a basic understanding of urban transit wheel/rail noise generation for application to the evaluation and improvement of wheel/rail n...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2010 CFR
2010-04-01
... required in accordance with subparts F, H, K or M of this part, it shall not be necessary to have conducted...-expected traffic. For example, if the area to be treated is heavily traveled, neither grass or sod shall be...
24 CFR 35.1330 - Interim controls.
Code of Federal Regulations, 2011 CFR
2011-04-01
... required in accordance with subparts F, H, K or M of this part, it shall not be necessary to have conducted...-expected traffic. For example, if the area to be treated is heavily traveled, neither grass or sod shall be...
42 CFR 418.307 - Periodic interim payments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...
Balancing risk and benefit in early-stage classical Hodgkin lymphoma.
Bröckelmann, Paul J; Sasse, Stephanie; Engert, Andreas
2018-04-12
With defined chemotherapy and radiotherapy (RT) and risk-adapted treatment, early-stage classical Hodgkin lymphoma (HL) has become curable in a majority of patients. Hence, a major current goal is to reduce treatment-related toxicity while maintaining long-term disease control. Patients with early-stage favorable disease (ie, limited stage without risk factors [RFs]) are frequently treated with 2 cycles of doxorubicin, bleomycin, vinblastine, and dacarbazine (2×ABVD) followed by 20-Gy involved-field or involved-site RT (IF/ISRT). In patients with early-stage unfavorable disease (ie, limited stage with RFs), 4 cycles of chemotherapy are usually consolidated with 30-Gy IF/ISRT. Compared with 4×ABVD, 2 cycles of bleomycin, etoposide, doxorubicin, cyclophosphamide, vincristine, procarbazine, and prednisone (2×BEACOPP escalated ) followed by 2×ABVD improved 5-year progression-free survival (PFS), with similar 5-year overall survival. Recently, treatment strategies based on [ 18 F]fluorodeoxyglucose positron emission tomography (PET) response were evaluated. In early-stage unfavorable HL, a majority of patients achieved a negative interim PET after 2×ABVD and an excellent outcome after 4×ABVD, whereas in those with a positive interim PET, 2×BEACOPP escalated improved 5-year PFS. Furthermore, a PET-guided RT approach was evaluated to decrease long-term toxicity. Although both the RAPID and H10 trials reported poorer disease control without RT, PET-guided omission of RT can constitute a valid therapeutic option in patients with an increased risk of RT-associated toxicity (eg, because of sex, age, or disease localization). Implementation of drugs such as the anti-CD30 antibody-drug conjugate brentuximab vedotin or the anti-programmed death 1 antibodies nivolumab or pembrolizumab might allow further reduction of overall mortality and improve quality of life in affected patients. © 2018 by The American Society of Hematology.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... (44 U.S.C. chapter 35). List of Subjects in 48 CFR Parts 209 and 252 Government procurement. Mary...-AG78 Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...). ACTION: Final rule. SUMMARY: DoD is adopting as a final rule, without change, an interim rule that...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2014 CFR
2014-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2011 CFR
2011-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2010 CFR
2010-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2012 CFR
2012-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
40 CFR 266.103 - Interim status standards for burners.
Code of Federal Regulations, 2013 CFR
2013-07-01
... complying with the CO controls of § 266.104(c), the CO limit is established based on the compliance test... testing planned, including a complete copy of the test protocol and Quality Assurance/Quality Control (QA...; (vi) In subpart G (Closure and post-closure), §§ 265.111-265.115; (vii) In subpart H (Financial...
75 FR 37310 - Control of Emissions From New and In-Use Nonroad Compression-Ignition Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-29
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 1039 Control of Emissions From New and In-Use Nonroad Compression- Ignition Engines CFR Correction In Title 40 of the Code of Federal Regulations, Part 1000 to End... for my engines in model year 2014 and earlier? * * * * * Table 2 of Sec. 1039.102--Interim Tier 4...
Transfer of Training from Predictor to Conventional Displays. Interim Report.
ERIC Educational Resources Information Center
Wulfeck, J. W.
Use of a predictor display has been shown to virtually transform the difficulty of a variety of complex, manual control pursuit tracking tasks to the level of those having relatively simple control requirements. With 15-minutes practice, naive operators are able to perform some complex tasks with a predictor display at accuracy levels previously…
ERIC Educational Resources Information Center
Kafafian, Haig
Presented is a report on the work of Cybernetics Research Institute (CRI) investigators on the development of deaf-blind communication and control systems (DEBLICOM). Described in Part One is one embodiment of DEBLICOM designed and built by CRI engineers. Reported in Part Two are experimental procedures and human factors considerations of…
NASA Astrophysics Data System (ADS)
Byrd, G.; Coleman, S.; Werneth, C.
2003-12-01
Our AY101 course has large enrollments. There are the usual attendance problems with students putting off studying until just before major exams, with predictable consequences. We (myself, faculty, Werneth, grad student, and Coleman, undergrad) describe our experience with one strategy to actively involve students: cooperatively answering quiz questions. We tried a solution during our May 2002 Interim term. Classes of three hours/day over three weeks make mid-class breaks essential! Before breaks, we presented a short multiple choice, open book/note quiz answered after break. Quizzes could increase grades, e.g. A- to an A, without excessively diluting importance of closed-book major exams. Comparing Interim 2002 final exams to Interim 2001, the average was 80%, much better than the 2001 class's 57%. The 2002 students interacted with one another more. Attendance was over 90%. During a regular semester, handing out and taking up papers would take up much time during the more frequent and larger classes. It's more interesting if students vote for different answers together then revealing the correct answer. Toward these ends, I obtained a grant for a "Classroom Performance System," a computer receiver unit, 128 ``TV remote" response pads and software for creating quizzes. Spring 2003, three teachers tried out the system in a trial fashion. To compare, we used the system during Interim 2003. Ease of giving quizzes and grading permitted a shorter 5 question quiz during break with another at class end totaling of 27 quizzes (almost one/day for a regular semester's Tuesday/Thursday class). Improvement was maintained with a slight 3 % increase. We used the CPS for events such as the recent Mars close approach. Kids of all ages like to check their understanding with a few questions. We created a web site where the students can interactively review questions and other materials, http://ay101.garnetsigma.com/index.html
The Decanal Divide: Women in Decanal Roles at U.S. Medical Schools.
Schor, Nina F
2018-02-01
To test the hypotheses that women in medical school dean-level (decanal) positions occupy lower-rank and more image- and education-focused positions than men, and that state and woman-led schools have more women in decanal positions. Data were collected on September 10-18, 2016, from Web sites of 136 allopathic, U.S. medical schools accredited by the Liaison Committee on Medical Education and represented on the roster of accredited MD programs in the United States with full accreditation as of June 22, 2016. Statistical significance of differences between comparison groups was assessed using Student t test with P < .05 indicating significance. Correlation between parameters was determined by Spearman rank correlation test with P < .05 indicating significant correlation. Findings demonstrate that only 15% (22/149) of deans and interim deans are women, and the prevalence of women in decanal positions decreases with ascending professional rank (R = 0.93; P < .05). Women are most prevalent in decanal positions focusing on education and mentoring or institutional public image and least prevalent in those focusing on corporate strategy and policy, finance, or government relations. Schools with a woman as dean or interim dean have a higher percentage of decanal positions occupied by women than those with a man as dean or interim dean (P < .05). State and private medical schools do not differ from one another in this regard. Gender stereotypes and models appear to continue to drive the number and roles of women in decanal positions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
RUTHERFORD WW; GEUTHER WJ; STRANKMAN MR
2009-04-29
The CH2M HILL Plateau Remediation Company (CHPRC) has recommended to the U.S. Department of Energy (DOE) a two phase approach for removal and storage (Phase 1) and treatment and packaging for offsite shipment (Phase 2) of the sludge currently stored within the 105-K West Basin. This two phased strategy enables early removal of sludge from the 105-K West Basin by 2015, allowing remediation of historical unplanned releases of waste and closure of the 100-K Area. In Phase 1, the sludge currently stored in the Engineered Containers and Settler Tanks within the 105-K West Basin will be transferred into sludge transportmore » and storage containers (STSCs). The STSCs will be transported to an interim storage facility. In Phase 2, sludge will be processed (treated) to meet shipping and disposal requirements and the sludge will be packaged for final disposal at a geologic repository. The purpose of this study is to evaluate two alternatives for interim Phase 1 storage of K Basin sludge. The cost, schedule, and risks for sludge storage at a newly-constructed Alternate Storage Facility (ASF) are compared to those at T Plant, which has been used previously for sludge storage. Based on the results of the assessment, T Plant is recommended for Phase 1 interim storage of sludge. Key elements that support this recommendation are the following: (1) T Plant has a proven process for storing sludge; (2) T Plant storage can be implemented at a lower incremental cost than the ASF; and (3) T Plant storage has a more favorable schedule profile, which provides more float, than the ASF. Underpinning the recommendation of T Plant for sludge storage is the assumption that T Plant has a durable, extended mission independent of the K Basin sludge interim storage mission. If this assumption cannot be validated and the operating costs of T Plant are borne by the Sludge Treatment Project, the conclusions and recommendations of this study would change. The following decision-making strategy, which is dependent on the confidence that DOE has in the long term mission for T Plant, is proposed: (1) If the confidence level in a durable, extended T Plant mission independent of sludge storage is high, then the Sludge Treatment Project (STP) would continue to implement the path forward previously described in the Alternatives Report (HNF-39744). Risks to the sludge project can be minimized through the establishment of an Interface Control Document (ICD) defining agreed upon responsibilities for both the STP and T Plant Operations regarding the transfer and storage of sludge and ensuring that the T Plant upgrade and operational schedule is well integrated with the sludge storage activities. (2) If the confidence level in a durable, extended T Plant mission independent of sludge storage is uncertain, then the ASF conceptual design should be pursued on a parallel path with preparation of T Plant for sludge storage until those uncertainties are resolved. (3) Finally, if the confidence level in a durable, extended T Plant mission independent of sludge storage is low, then the ASF design should be selected to provide independence from the T Plant mission risk.« less
Pritchett, Yili; Jemiai, Yannis; Chang, Yuchiao; Bhan, Ishir; Agarwal, Rajiv; Zoccali, Carmine; Wanner, Christoph; Lloyd-Jones, Donald; Cannata-Andía, Jorge B; Thompson, Taylor; Appelbaum, Evan; Audhya, Paul; Andress, Dennis; Zhang, Wuyan; Solomon, Scott; Manning, Warren J; Thadhani, Ravi
2011-04-01
Chronic kidney disease is associated with a marked increase in risk for left ventricular hypertrophy and cardiovascular mortality compared with the general population. Therapy with vitamin D receptor activators has been linked with reduced mortality in chronic kidney disease and an improvement in left ventricular hypertrophy in animal studies. PRIMO (Paricalcitol capsules benefits in Renal failure Induced cardia MOrbidity) is a multinational, multicenter randomized controlled trial to assess the effects of paricalcitol (a selective vitamin D receptor activator) on mild to moderate left ventricular hypertrophy in patients with chronic kidney disease. Subjects with mild-moderate chronic kidney disease are randomized to paricalcitol or placebo after confirming left ventricular hypertrophy using a cardiac echocardiogram. Cardiac magnetic resonance imaging is then used to assess left ventricular mass index at baseline, 24 and 48 weeks, which is the primary efficacy endpoint of the study. Because of limited prior data to estimate sample size, a maximum information group sequential design with sample size re-estimation is implemented to allow sample size adjustment based on the nuisance parameter estimated using the interim data. An interim efficacy analysis is planned at a pre-specified time point conditioned on the status of enrollment. The decision to increase sample size depends on the observed treatment effect. A repeated measures analysis model, using available data at Week 24 and 48 with a backup model of an ANCOVA analyzing change from baseline to the final nonmissing observation, are pre-specified to evaluate the treatment effect. Gamma-family of spending function is employed to control family-wise Type I error rate as stopping for success is planned in the interim efficacy analysis. If enrollment is slower than anticipated, the smaller sample size used in the interim efficacy analysis and the greater percent of missing week 48 data might decrease the parameter estimation accuracy, either for the nuisance parameter or for the treatment effect, which might in turn affect the interim decision-making. The application of combining a group sequential design with a sample-size re-estimation in clinical trial design has the potential to improve efficiency and to increase the probability of trial success while ensuring integrity of the study.
Remedy Selection and Land Use at Federal Facilities
Analysis of approximately 98 percent of the interim and final source control Records of Decision signed at Federal Facilities on the NPL from the beginning of Superfund through August 1995. PB96-963309. EPA/540/R-96/020. August 1996
40 CFR 265.111 - Closure performance standard.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Section 265.111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...) Controls, minimizes or eliminates, to the extent necessary to protect human health and the environment...
40 CFR 265.111 - Closure performance standard.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 265.111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND...) Controls, minimizes or eliminates, to the extent necessary to protect human health and the environment...
PCP cracking and bridge deck reinforcement : an interim report.
DOT National Transportation Integrated Search
2010-10-28
TxDOT Project 0-6348 Controlling Cracking in Prestressed Concrete Panels and Optimizing Bridge Deck : Reinforcing Steel started on September 1, 2008 and is scheduled to end on August 31, 2012. The project is : proceeding on schedule. This repor...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-25
... anti-sweat heaters. Therefore, it is ordered that: The application for interim waiver filed by Samsung... control anti-sweat heaters according to the alternate test procedure as set forth in section IV...
Implementation of high performance concrete in Louisiana bridges : interim report.
DOT National Transportation Integrated Search
1998-02-01
The report contains a research plan to assist in the implementation of high performance concrete in the Charenton Canal Bridge in Louisiana. The research involves a literature review, plan review, development of a quality control program for the conc...
Herzog, Andrew G
2015-05-01
To present the interim findings of the Epilepsy Birth Control Registry (EBCR) regarding the impact of various contraceptive methods on seizures, stratified by antiepileptic drug (AED) type. This is an observational study that reports interim findings on the first 750 subjects. There are significantly greater relative risks (RR) for both seizure increase and decrease with hormonal contraception (HC) than with non-hormonal contraception (NHC). The rates of HC experiences associated with seizure increase (21.0%) are greater than with NHC (3.9%) (RR=5.39 [95% CI=3.77-7.73, p<0.0001]). The rates of HC experiences associated with seizure decrease (10.3%) are greater than with NHC (5.6%) (RR=1.85 [95% CI=1.30-2.62, p=0.0006]). While differences can reflect biological effects or reporting bias, the finding of a greater RR for seizure increase with hormonal patch than with combined oral contraceptive, perhaps related to the delivery of substantially higher concentrations of hormones, and a greater RR for seizure decrease with depomedroxyprogesterone, known to reduce seizure frequency when used in dosages which produce amenorrhea, support biological effects. All AED categories showed significantly higher frequencies of reports of seizure increase when combined with HC than with NHC. RR for seizure increase with HC was higher with valproate than with any other AED category. There were no significant differences among AEDs for seizure decrease with HC at this juncture of the study. Overall, NEIAEDs had the most favorable profile with regard to reports of seizure increase and decrease when used with HC. Interim EBCR findings suggest that contraception category and interactions between contraception category and AED category are predictive factors for changes in seizure frequency in WWE. Copyright © 2015 British Epilepsy Association. Published by Elsevier Ltd. All rights reserved.
Pilot-scale treatability test plan for the 200-BP-5 operable unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This document presents the treatability test plan for pilot-scale pump and treat testing at the 200-BP-5 Operable Unit. This treatability test plan has been prepared in response to an agreement between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology), as documented in Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1989a) Change Control Form M-13-93-03 (Ecology et al. 1994) and a recent 200 NPL Agreement Change Control Form (Appendix A). The agreement also requires that, following completion of the activities described in thismore » test plan, a 200-BP-5 Operable Unit Interim Remedial Measure (IRM) Proposed Plan be developed for use in preparing an Interim Action Record of Decision (ROD). The IRM Proposed Plan will be supported by the results of this treatability test plan, as well as by other 200-BP-5 Operable Unit activities (e.g., development of a qualitative risk assessment). Once issued, the Interim Action ROD will specify the interim action(s) for groundwater contamination at the 200-BP-5 Operable Unit. The treatability test approach is to conduct a pilot-scale pump and treat test for each of the two contaminant plumes associated with the 200-BP-5 Operable Unit. Primary contaminants of concern are {sup 99}Tc and {sup 60}Co for underwater affected by past discharges to the 216-BY Cribs, and {sup 90}Sr, {sup 239/240}Pu, and Cs for groundwater affected by past discharges to the 216-B-5 Reverse Well. The purpose of the pilot-scale treatability testing presented in this testplan is to provide the data basis for preparing an IRM Proposed Plan. To achieve this objective, treatability testing must: Assess the performance of groundwater pumping with respect to the ability to extract a significant amount of the primary contaminant mass present in the two contaminant plumes.« less
Arzimanoglou, Alexis; Ferreira, Jose A; Satlin, Andrew; Mendes, Shannon; Williams, Betsy; Critchley, David; Schuck, Edgar; Hussein, Ziad; Kumar, Dinesh; Dhadda, Shobha; Bibbiani, Francesco
2016-05-01
A good knowledge of safety and age group-specific pharmacokinetics (PK) of antiepileptic drugs (AEDs) in young pediatric patients is of great importance in clinical practice. This paper presents 6-month interim safety and PK from an ongoing 2-year open-label study (Study 303) of adjunctive rufinamide treatment in pediatric subjects ≥ 1 to < 4 years with inadequately controlled epilepsies of the Lennox-Gastaut syndrome (LGS) spectrum. Subjects (N = 37) were randomized to either rufinamide or any other approved AED chosen by the investigator as adjunctive therapy to the subject's existing regimen of 1-3 AEDs. Interim safety results showed that treatment-emergent adverse events (TEAEs) were similar between the rufinamide (22 [88.0%]) and any-other-AED group (9 [81.8%]), with most events considered mild or moderate. A population PK analysis was conducted including plasma rufinamide concentrations from Study 303 and two other study populations of LGS subjects ≥ 4 years. The rufinamide PK profile was dose independent. The apparent clearance (CL/F) estimated from the PK model was 2.19 L/h; it was found to increase significantly as a function of body weight. Coadministration of valproic acid significantly decreased rufinamide CL/F. CL/F was not significantly affected by other concomitant AEDs, age, gender, race, hepatic function, or renal function. No adjustments to body weight-based rufinamide dosing in subjects ≥ 1 to < 4 years are necessary. Rufinamide was safe and well tolerated in these pediatric subjects. Results from the interim analysis demonstrate that rufinamide's safety and PK profile is comparable in subjects ≥ 1 to < 4 and ≥ 4 years with LGS. Study 303 (clinicaltrials.gov: NCT01405053). Copyright © 2016 The Authors. Published by Elsevier Ltd.. All rights reserved.
Graiff, Lorenzo; Vigolo, Paolo
2012-04-01
Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.
Kennedy Space Center Press Site (SWMU 074) Interim Measure Report
NASA Technical Reports Server (NTRS)
Applegate, Joseph L.
2015-01-01
This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).
75 FR 10645 - Low Pathogenic Avian Influenza; Voluntary Control Program and Payment of Indemnity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
...We are adopting as a final rule, with changes, an interim rule that amended the regulations by establishing, under the auspices of the National Poultry Improvement Plan, a voluntary program for the control of the H5/H7 subtypes of low pathogenic avian influenza in commercial poultry. As amended by this document, the rule provides that the amount of indemnity for which contract growers are eligible will be reduced by any payment they have already received on their contracts when poultry in their care are destroyed, clarifies the roles of cooperating State agencies with respect to H5/H7 low pathogenic avian influenza outbreaks, provides that consistency with humane euthanasia guidelines will be considered when selecting a method for the destruction of poultry, and provides additional guidance for cleaning and disinfecting an affected premises. The control program and indemnity provisions established by the interim rule are necessary to help ensure that the H5/H7 subtypes of low pathogenic avian influenza are detected and eradicated when they occur within the United States.
Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F
2013-05-01
At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.
ERIC Educational Resources Information Center
Weigel, Corina; Kokocinski, Kathrin; Lederer, Peter; Dotsch, Jorg; Rascher, Wolfgang; Knerr, Ina
2008-01-01
Objective: The authors performed a group-based program for obese children and adolescents in Bavaria, Germany to enable them to establish a health-oriented lifestyle and to reduce overweight. The authors compared this program with a control approach based on the patients' own initiative. Design: This is a controlled clinical trial. Setting: A…
40 CFR 1033.150 - Interim provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... carryover data from an engine family that we previously considered available for the configuration, the...) Idle controls. A locomotive equipped with an automatic engine stop/start system that was originally... small manufacturers under § 1033.901. (e) Producing switch locomotives using certified nonroad engines...
40 CFR 1033.150 - Interim provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... carryover data from an engine family that we previously considered available for the configuration, the...) Idle controls. A locomotive equipped with an automatic engine stop/start system that was originally... small manufacturers under § 1033.901. (e) Producing switch locomotives using certified nonroad engines...
40 CFR 1033.150 - Interim provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... carryover data from an engine family that we previously considered available for the configuration, the...) Idle controls. A locomotive equipped with an automatic engine stop/start system that was originally... small manufacturers under § 1033.901. (e) Producing switch locomotives using certified nonroad engines...
Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung
2017-01-01
Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.
ICPSU Install onto Mobile Launcher
2018-03-16
A heavy-lift crane slowly lifts the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) high up for installation on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
A crane and rigging lines are used to install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) high up on the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
Construction workers with JP Donovan assist with preparations to lift and install the Interim Cryogenic Propulsion Stage Umbilical on the tower of the mobile launcher at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
Construction workers with JP Donovan install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) at about the 240-foot-level of the mobile launcher (ML) tower at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher
2018-03-16
A heavy-lift crane slowly lifts the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) up for installation on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
The mobile launcher (ML) tower is lit up before early morning sunrise at NASA's Kennedy Space Center in Florida. Preparations are underway to lift and install the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) at about the 240-foot-level on the tower. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mays, S.E.; Poloski, J.P.; Sullivan, W.H.
1982-07-01
This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less
Guidance: Interim Municipal Settlement Policy
Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.
Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts—An Interim Process Evaluation
Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Neal, Bruce
2017-01-01
The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention (n = 22) or control (n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies (p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government’s Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods. PMID:29039802
Effects of an Advocacy Trial on Food Industry Salt Reduction Efforts-An Interim Process Evaluation.
Trevena, Helen; Petersen, Kristina; Thow, Anne Marie; Dunford, Elizabeth K; Wu, Jason H Y; Neal, Bruce
2017-10-17
The decisions made by food companies are a potent factor shaping the nutritional quality of the food supply. A number of non-governmental organizations (NGOs) advocate for corporate action to reduce salt levels in foods, but few data define the effectiveness of advocacy. This present report describes the process evaluation of an advocacy intervention delivered by one Australian NGO directly to food companies to reduce the salt content of processed foods. Food companies were randomly assigned to intervention ( n = 22) or control ( n = 23) groups. Intervention group companies were exposed to pre-planned and opportunistic communications, and control companies to background activities. Seven pre-defined interim outcome measures provided an indication of the effect of the intervention and were assessed using intention-to-treat analysis. These were supplemented by qualitative data from nine semi-structured interviews. The mean number of public communications supporting healthy food made by intervention companies was 1.5 versus 1.8 for control companies ( p = 0.63). Other outcomes, including the mean number of news articles, comments and reports (1.2 vs. 1.4; p = 0.72), a published nutrition policy (23% vs. 44%; p = 0.21), public commitment to the Australian government's Food and Health Dialogue (FHD) (41% vs. 61%; p = 0.24), evidence of a salt reduction plan (23% vs. 30%; p = 0.56), and mean number of communications with the NGO (15 vs. 11; p = 0.28) were also not significantly different. Qualitative data indicated the advocacy trial had little effect. The absence of detectable effects of the advocacy intervention on the interim markers indicates there may be no impact of the NGO advocacy trial on the primary outcome of salt reduction in processed foods.
Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.
Dallas, Michael J
2008-01-01
Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
28 CFR 94.41 - Interim emergency payment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...
76 FR 4369 - Special Law Enforcement Commissions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-25
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
33 CFR 385.9 - Implementation principles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...
Mahableshwarkar, Atul R; Calabrese, Joseph R; Macek, Thomas A; Budur, Kumar; Adefuye, Adedeji; Dong, Xinxin; Hanson, Elizabeth; Sachs, Gary S
2017-10-15
The optimal long-term management strategy for bipolar I disorder patients is not yet established. Evidence supports the rationale for circadian rhythm regulation to prevent mood episode relapse in bipolar patients. This study evaluated the efficacy and safety of a new sublingual formulation of the melatonin receptor agonist ramelteon (ramelteon SL) as adjunctive therapy in the maintenance treatment of bipolar I patients. In a double-blinded trial in the United States and Latin America, adult bipolar I disorder patients stable for ≥ 8 weeks before baseline and with a mood episode 8 weeks to 9 months before screening, were randomized to once-daily ramelteon SL 0.1mg (n = 164), 0.4mg (n = 160), or 0.8mg (n = 154), or placebo (n = 164), in addition to their existing treatment. The primary endpoint was time from randomization to relapse of symptoms. The prespecified futility criterion in a planned, unblinded, independent interim analysis was the failure of all ramelteon SL doses to achieve a conditional power ≥ 30% compared with placebo. No significant differences between any dose of ramelteon SL and placebo were observed. The study was terminated after meeting the futility criteria. Ramelteon SL was well tolerated, with a safety profile consistent with that for oral ramelteon. A low rate of relapse events precluded detection of any statistically significant difference between groups. The study failed to demonstrate the efficacy of ramelteon SL as adjunctive maintenance therapy for bipolar disorder. Interim analyses for futility in clinical studies are valuable in preventing unnecessary exposure of subjects to interventions. Copyright © 2017. Published by Elsevier B.V.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-10
...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.
40 CFR 745.82 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-07-01
... child-occupied facilities, except for the following: (1) Renovations in target housing or child-occupied...) Renovations in target housing or child-occupied facilities in which a certified renovator, using an EPA... with significant damage. Interim controls performed in response to an elevated blood lead level in a...
CONTROL OF CHELATOR-BASED UPSETS IN SURFACE FINISHING SHOP WASTE WATER TREATMENT SYSTEMS
Actual surface finishing shop examples are used to illustrate the use of process chemistry understanding and analyses to identify immediate, interim and permanent response options for industrial waste water treatment plant (IWTP) upset problems caused by chelating agents. There i...
DOT National Transportation Integrated Search
1981-11-01
The Louisiana Department of Transportation and Development reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Department's design engineers meet this challenge through proper section design ...
Code of Federal Regulations, 2010 CFR
2010-07-01
... HIGHWAY VEHICLES AND ENGINES (CONTINUED) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light-Duty Trucks, and Complete Otto-Cycle Heavy-Duty Vehicles...
Mullen Conley, Kathleen; Juhl Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2010-01-01
The Kids Identifying and Defeating Stroke (KIDS) project is a 3-year prospective, randomized, controlled, multiethnic school-based intervention study. Project goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic White (NHW) middle school students and their parents. This article describes the design, implementation, and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the sixth, seventh, and eighth grades. Each class session also included a homework assignment that involved the students' parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students' stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls. The authors conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise.
42 CFR 417.574 - Interim settlement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
14 CFR 136.41 - Interim operating authority.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...
10 CFR 590.403 - Emergency interim orders.
Code of Federal Regulations, 2010 CFR
2010-01-01
... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...
EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.
EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.
49 CFR 37.193 - Interim service requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...
76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...
EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed
This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
45 CFR 1623.6 - Interim funding.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...
Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn
2010-06-01
This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.
Negative pressure wound therapy for partial-thickness burns.
Dumville, Jo C; Munson, Christopher; Christie, Janice
2014-12-15
A burn wound is a complex and evolving injury, with both local and systemic consequences. Burn treatments include a variety of dressings, as well as newer strategies, such as negative pressure wound therapy (NPWT), which, by means of a suction force that drains excess fluids from the burn, tries to promote the wound healing process and minimise progression of the burn wound. To assess the effectiveness of NPWT for people with partial-thickness burns. We searched the Cochrane Wounds Group Specialised Register (searched 04 September 2014); The Cochrane Central Register of Controlled Trials (CENTRAL) (The Cochrane Library 2014, Issue 8). All randomised controlled trials (RCTs) and controlled clinical trials (CCTs) that evaluated the safety and effectiveness of NPWT for partial-thickness burns. Two review authors used standardised forms, and extracted the data independently. We assessed each trial for risk of bias, and resolved differences by discussion. One RCT, that was an interim report, satisfied the inclusion criteria. We undertook a narrative synthesis of results, as the absence of data and poor reporting precluded us from carrying out any formal statistical analysis. The trial was at high risk of bias. There was not enough evidence available to permit any conclusions to be drawn regarding the use of NPWT for treatment of partial-thickness burn wounds.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, Po-Lun; Gattiker, J. R.; Liu, Xiaohong
2013-06-27
A Gaussian process (GP) emulator is applied to quantify the contribution of local and remote emissions of black carbon (BC) on the BC concentrations in different regions using a Latin Hypercube sampling strategy for emission perturbations in the offline version of the Community Atmosphere Model Version 5.1 (CAM5) simulations. The source-receptor relationships are computed based on simulations constrained by a standard free-running CAM5 simulation and the ERA-Interim reanalysis product. The analysis demonstrates that the emulator is capable of retrieving the source-receptor relationships based on a small number of CAM5 simulations. Most regions are found susceptible to their local emissions. Themore » emulator also finds that the source-receptor relationships retrieved from the model-driven and the reanalysis-driven simulations are very similar, suggesting that the simulated circulation in CAM5 resembles the assimilated meteorology in ERA-Interim. The robustness of the results provides confidence for applying the emulator to detect dose-response signals in the climate system.« less
An Adaptive Staggered Dose Design for a Normal Endpoint.
Wu, Joseph; Menon, Sandeep; Chang, Mark
2015-01-01
In a clinical trial where several doses are compared to a control, a multi-stage design that combines both the selection of the best dose and the confirmation of this selected dose is desirable. An example is the two-stage drop-the-losers or pick-the-winner design, where inferior doses are dropped after interim analysis. Selection of target dose(s) can be based on ranking of observed effects, hypothesis testing with adjustment for multiplicity, or other criteria at interim stages. A number of methods have been proposed and have made significant gains in trial efficiency. However, many of these designs started off with all doses with equal allocation and did not consider prioritizing the doses using existing dose-response information. We propose an adaptive staggered dose procedure that allows explicit prioritization of doses and applies error spending scheme that favors doses with assumed better responses. This design starts off with only a subset of the doses and adaptively adds new doses depending on interim results. Using simulation, we have shown that this design performs better in terms of increased statistical power than the drop-the-losers design given strong prior information of dose response.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1992-09-01
This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includesmore » sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.« less
Huh, Warner K; Ault, Kevin A; Chelmow, David; Davey, Diane D; Goulart, Robert A; Garcia, Francisco A R; Kinney, Walter K; Massad, L Stewart; Mayeaux, Edward J; Saslow, Debbie; Schiffman, Mark; Wentzensen, Nicolas; Lawson, Herschel W; Einstein, Mark H
2015-02-01
In 2011, the American Cancer Society, the American Society for Colposcopy and Cervical Pathology, and the American Society for Clinical Pathology updated screening guidelines for the early detection of cervical cancer and its precursors. Recommended screening strategies were cytology and cotesting (cytology in combination with hrHPV testing). These guidelines also addressed the use of hrHPV testing alone as a primary screening approach, which was not recommended for use at that time. There is now a growing body of evidence for screening with primary hrHPV testing, including a prospective US-based registration study. Thirteen experts including representatives from the Society of Gynecologic Oncology, American Society for Colposcopy and Cervical Pathology, American College of Obstetricians and Gynecologists, American Cancer Society, American Society of Cytopathology, College of American Pathologists, and the American Society for Clinical Pathology, convened to provide interim guidance for primary hrHPV screening. This guidance panel was specifically triggered by an application to the FDA for a currently marketed HPV test to be labeled for the additional indication of primary cervical cancer screening. Guidance was based on literature review and review of data from the FDA registration study, supplemented by expert opinion. This document aims to provide information for healthcare providers who are interested in primary hrHPV testing and an overview of the potential advantages and disadvantages of this strategy for screening as well as to highlight areas in need of further investigation. Copyright © 2015 Elsevier Inc. All rights reserved.
78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-06
...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...
78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...
24 CFR 115.207 - Consequences of interim certification and certification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
46 CFR 308.203 - Amount insured under interim binder.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...
76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-01
... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...
Quantum Manybody Physics with Rydberg Polaritons
2016-06-22
report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...for public release. Over the course of this grant, we have seen tremendous progress, both theoretically and experimentally , in our control of photonic...shown in multiple stages of construction at left and below, spans three optical tables in two rooms: One for the experimental control system
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
30 CFR 827.13 - Coal preparation plants: Interim performance standards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-22
... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-28
..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
ERIC Educational Resources Information Center
Nugent, Patricia A.
2011-01-01
The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…
Presidential Transition: The Experience of Two Community College Interim Presidents
ERIC Educational Resources Information Center
Thompson, Matthew D.
2010-01-01
The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…
47 CFR 73.404 - Interim hybrid IBOC DAB operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...
17 CFR 210.10-01 - Interim financial statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-07
... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...
78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...
75 FR 66553 - Truth in Lending
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...
Faculty and Student Views of the Interim Term
ERIC Educational Resources Information Center
Centra, John A.; Sobol, Marion G.
1974-01-01
Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)
12 CFR 541.18 - Interim Federal savings association.
Code of Federal Regulations, 2010 CFR
2010-01-01
... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
15 CFR 904.322 - Interim action.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...
Into the Sunset: Reflections of an Interim Administrator.
ERIC Educational Resources Information Center
Marlowe, John
2000-01-01
One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)
2015-09-30
1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on
Disturbances of Higher Level Neural Control-Robotic Applications in Stroke
2001-10-25
Interim Results on the Follow-up of 76 Patients and on Movement Performance Indices, In: Mounir Mokhtari (ed); Integration of Assistive Technology in the...the Nervous System’s Adaptive Mechanisms, In: Mounir Mokhtari (ed); Integration of Assistive Technology in the Information Age; IOS Press, Assistive
DOT National Transportation Integrated Search
1978-03-01
Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...
DOT National Transportation Integrated Search
1977-03-01
Louisiana's Office of Highways reacts to a major problem when it attempts to shape and control drainage patterns along its right-of-ways. The Office's design engineers meet this challenge through proper section design and appropriate application of d...
DOT National Transportation Integrated Search
1995-05-01
KEYWORDS : ADVANCED VEHICLE CONTROL & SAFETY SYSTEMS OR AVCSS, COLLISION WARNING/AVOIDANCE SYSTEMS, CRASH REDUCTION, INTELLIGENT VEHICLE INITIATIVE OR IVI : RESULTS FROM THE TESTING OF ELEVEN COLLISION AVOIDANCE SYSTEMS (CAS) FOR LANE CHANGE, ...
DOT National Transportation Integrated Search
1991-02-01
The need to reduce Minnesota's dependence on land fills resulted in a unique cooperative venture by three state agencies. A partnership was forged between the Minnesota Pollution Control Agency (MPCA), the Minnesota Department of Natural Resources (D...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
14 CFR 171.263 - Localizer automatic monitor system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... (CONTINUED) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing... provide an automatic monitor system that transmits a warning to designated local and remote control points... centerline equivalent to more than 0.015 DDM at the ISMLS reference datum. (2) For localizers in which the...
Aligned Carbon Nanotube Carpets on Carbon Substrates for High Power Electronic Applications
2016-06-01
SiOx by a vapor-solid-solid mechanism ,” J. Am. Chem. Soc., vol. 133, pp. 197–199, 2011. [146] B. Liu, W. Ren, C. Liu, C.-H. Sun , L. Gao, S. Li, C... Mechanical and Thermal Systems Branch Power and Control Division JUNE 2016 Interim Report DISTRIBUTION STATEMENT A: Approved for public release...Advisor Program Engineer Mechanical and Thermal Systems Branch Mechanical and Thermal Systems Branch Power and Control Division Power and Control
NASA Technical Reports Server (NTRS)
Burcham, Michael S.; Daprato, Rebecca C.
2016-01-01
This document presents the design details for an Interim Measure (IM) Work Plan (IMWP) for the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, located at the John F. Kennedy Space Center (KSC), Florida. The MLPV Area has been designated Solid Waste Management Unit Number 056 (SWMU 056) under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. This report was prepared by Geosyntec Consultants (Geosyntec) for the National Aeronautics and Space Administration (NASA) under contract number NNK09CA02B and NNK12CA13B, project control number ENV1642. The Advanced Data Package (ADP) presentation covering the elements of this IMWP report received KSC Remediation Team (KSCRT) approval at the December 2015 Team Meeting; the meeting minutes are included in Appendix A.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
The decision document presents the selected interim remedial action for the groundwater operable unit at the Cornhusker Army Ammunition Plant (CAAP). Operable Unit One encompasses the explosives groundwater plume(s), both on-post and off-post. Explosives of concern in the contaminant plume include RDX, TNT, HMX, and their decomposition products. The objective of the interim action is to contain the plume and prevent further migration of contaminants, and does not encompass full restoration of the plume of contaminated groundwater. The recommended alternatives provide an approach to containing and removing contaminant mass from the groundwater plume. This approach will control further migration ofmore » the plume and reduce the levels of the contamination in groundwater.« less
Sample size determination in group-sequential clinical trials with two co-primary endpoints
Asakura, Koko; Hamasaki, Toshimitsu; Sugimoto, Tomoyuki; Hayashi, Kenichi; Evans, Scott R; Sozu, Takashi
2014-01-01
We discuss sample size determination in group-sequential designs with two endpoints as co-primary. We derive the power and sample size within two decision-making frameworks. One is to claim the test intervention’s benefit relative to control when superiority is achieved for the two endpoints at the same interim timepoint of the trial. The other is when the superiority is achieved for the two endpoints at any interim timepoint, not necessarily simultaneously. We evaluate the behaviors of sample size and power with varying design elements and provide a real example to illustrate the proposed sample size methods. In addition, we discuss sample size recalculation based on observed data and evaluate the impact on the power and Type I error rate. PMID:24676799
ICPSU Install onto Mobile Launcher
2018-03-16
The mobile launcher (ML) is reflected in the sunglasses of a construction worker with JP Donovan at NASA's Kennedy Space Center in Florida. A crane is lifting the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) up for installation on the tower of the ML. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical is located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
A construction worker with JP Donovan helps prepare the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) for installation high up on the tower of the mobile launcher (ML) at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will be located at about the 240-foot-level of the mobile launcher and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
ICPSU Install onto Mobile Launcher - Preps for Lift
2018-03-15
Construction workers with JP Donovan attach a heavy-lift crane to the Interim Cryogenic Propulsion Stage Umbilical (ICPSU) to prepare for lifting and installation on the mobile launcher (ML) tower at NASA's Kennedy Space Center in Florida. The last of the large umbilicals to be installed, the ICPSU will provide super-cooled hydrogen and liquid oxygen to the Space Launch System (SLS) rocket's interim cryogenic propulsion stage, or upper stage, at T-0 for Exploration Mission-1. The umbilical will be located at about the 240-foot-level of the ML and will supply fuel, oxidizer, gaseous helium, hazardous gas leak detection, electrical commodities and environment control systems to the upper stage of the SLS rocket during launch. Exploration Ground Systems is overseeing installation of the umbilicals on the ML.
IUS/TUG orbital operations and mission support study. Volume 2: Interim upper stage operations
NASA Technical Reports Server (NTRS)
1975-01-01
Background data and study results are presented for the interim upper stage (IUS) operations phase of the IUS/tug orbital operations study. The study was conducted to develop IUS operational concepts and an IUS baseline operations plan, and to provide cost estimates for IUS operations. The approach used was to compile and evaluate baseline concepts, definitions, and system, and to use that data as a basis for the IUS operations phase definition, analysis, and costing analysis. Both expendable and reusable IUS configurations were analyzed and two autonomy levels were specified for each configuration. Topics discussed include on-orbit operations and interfaces with the orbiter, the tracking and data relay satellites and ground station support capability analysis, and flight control center sizing to support the IUS operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...
Do Interim Assessments Reduce the Race and SES Achievement Gaps?
ERIC Educational Resources Information Center
Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie
2017-01-01
The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-08
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...
76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-06
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-29
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...
Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2011 CFR
2011-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2010 CFR
2010-07-01
...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...
33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?
Code of Federal Regulations, 2010 CFR
2010-07-01
... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...
18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...
42 CFR 417.572 - Budget and enrollment forecast and interim reports.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...
40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2013 CFR
2013-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2011 CFR
2011-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2012 CFR
2012-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
46 CFR 308.6 - Period of interim binders, updating application information and new applications.
Code of Federal Regulations, 2010 CFR
2010-10-01
... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-16
...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...
31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Options. 35.120 Section 35.120... and Definitions for All Programs. § 35.120 Options. (a) Standard treatments. Where interim controls are required by this part, the designated party has the option to presume that lead-based paint or...
24 CFR 35.620 - Multifamily insured property constructed before 1960.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., Department of Housing and Urban Development LEAD-BASED PAINT POISONING PREVENTION IN CERTAIN RESIDENTIAL... constructed before 1960: (a) Risk assessment. Before the issuance of a firm commitment the sponsor shall conduct a risk assessment in accordance with § 35.1320(b). (b) Interim controls. (1) The sponsor shall...
40 CFR 57.302 - Performance level of interim constant controls.
Code of Federal Regulations, 2011 CFR
2011-07-01
... exceed the following: (i) For sulfuric acid plants on copper smelters, 12-hour running average; (ii) For sulfuric acid plants on lead smelters, 6-hour running average; (iii) For sulfuric acid plants on zinc... limitation shall take into account unavoidable catalyst deterioration in sulfuric acid plants, but may...
This cost-review approach applies to all program and PPG awards made under 40 CFR Part 35, Subpart A, where the recipient has an established, on-going grant relationship with EPA and has adequate internal controls in its personnel.
76 FR 35445 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... Information Collection: Medical Loss Ratio Quarterly Reporting; Use: Under Section 2718 of the Affordable Care... ratio, referred to as the medical loss ratio (MLR). An interim final rule (IFR) implementing the MLR was... information collections, please reference the document identifier or OMB control number. To be assured...
DOT National Transportation Integrated Search
1981-01-01
Stream monitoring stations have been installed on eight construction projects under Phase 1 of this study. Monitoring on four of the projects is complete and monitoring on the remaining four is continuing. On the basis of the limited data, it appears...
40 CFR 1042.145 - Interim provisions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 1042.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS... Tier 4 Standards Fraction of useful life already used In-use adjustments (g/kW-hr) For model year 2017 and earlier Tier 4 NOX standards For model year 2017 and earlier Tier 4 PM standards 0 75% of useful...
40 CFR 1042.145 - Interim provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 1042.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS... Tier 4 Standards Fraction of useful life already used In-use adjustments (g/kW-hr) For model year 2017 and earlier Tier 4 NOX standards For model year 2017 and earlier Tier 4 PM standards 0 75% of useful...
40 CFR 1042.145 - Interim provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 1042.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS... Tier 4 Standards Fraction of useful life already used In-use adjustments (g/kW-hr) For model year 2017 and earlier Tier 4 NOX standards For model year 2017 and earlier Tier 4 PM standards 0 75% of useful...
40 CFR 1042.145 - Interim provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 1042.145 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS... Tier 4 Standards Fraction of useful life already used In-use adjustments (g/kW-hr) For model year 2017 and earlier Tier 4 NOX standards For model year 2017 and earlier Tier 4 PM standards 0 75% of useful...
40 CFR 57.302 - Performance level of interim constant controls.
Code of Federal Regulations, 2010 CFR
2010-07-01
... limitation shall take into account unavoidable catalyst deterioration in sulfuric acid plants, but may prescribe the frequency of catalyst screening or replacement. The NSO shall also prohibit the smelter owner... completely fill all available catalyst bed stages with sufficient catalyst; (iii) Inability of the gas pre...
Alternate hosts of Blepharipa pratensis (Meigen)
Paul A. Godwin; Thomas M. Odell
1977-01-01
A current tactic for biological control of the gypsy moth, Lymantria dispar Linnaeus, is to release its parasites in forests susceptible to gypsy moth damage before the gypsy moth arrives. The basic assumption in these anticipatory releases is that the parasites can find and utilize native insects as hosts in the interim. Blepharipa...
NASA Astrophysics Data System (ADS)
José González-Rojí, Santos; Wilby, Robert L.; Sáenz, Jon; Ibarra-Berastegi, Gabriel
2017-04-01
Downscaling via the Statistical DownScaling Model (SDSM) version 5.2 and two different configurations of the dynamical WRF model (with and without 3DVAR data assimilation) was evaluated for the estimation of daily precipitation over 21 sites across the Iberian Peninsula during the period 2010-2014. Six different strategies were used to calibrate the SDSM model. These options cover (1) use of NCEP/NCAR R1 Reanalysis and (2) ERA Interim data for downscaling predictor variables calibrated with data from periods (3) 1948-2009 (NCEP/NCAR R1) and (4) 1979-2009 (NCEP/NCAR R1 and ERA Interim). Additionally, for the ERA Interim case, two different grid resolutions have been used, (5) 2.5° and (6) 0.75°. On the other side, for the NCEP/NCAR R1 case, only the 2.5° resolution has been used. Configuring the SDSM model in this way allows testing the sensitivity of the results to different origins of the predictors, fit to different calibration periods and use of different reanalysis resolutions. On the other hand, ERA Interim data at the highest resolution was used as the initial/boundary conditions to run WRF simulations with a 15 km x 15 km horizontal resolution over the Iberian Peninsula, for two different configurations. The first experiment (N) was run using the same configuration typically used for numerical downscaling, with information being fed through the boundaries of the domain. The second experiment (D) was run using 3DVAR data assimilation at 00UTC, 06UTC, 12UTC and 18UTC. In both cases, WRF simulations were run over the period 2009-2014, using the first year (2009) as spin-up for the soil model. Results from the WRF N and D runs and comparable SDSM set up for the period 2010-2014 were evaluated using observations from ECA and E-OBS datasets. In each case, model skill was assessed using seven daily precipitation metrics (absolute mean, wet-day intensity, 90th percentile, maximum 5-day total, maximum number of consecutive dry days, fraction of total from heavy events and number of heavy events defined here as values over the threshold of 90th percentile. Our results show that the SDSM model improves its behaviour when using predictors from the ERA Interim Reanalysis. Improvements are even more impressive when using the 0.75° resolution for ERA Interim. Better results than using WRF D are obtained with this configuration of the SDSM model for mean precipitation and precipitation intensity. Overall, the analysis reveals the extent to which the skill of SDSM can be improved through judicious choice of downscaling predictor source, grid resolution and calibration period. Moreover, the computationally efficient SDSM tool can achieve comparable skill to WRF over a range of precipitation metrics and the contrasting rainfall regimes of the Iberian Peninsula.
Davidson, Judy E
2009-03-01
The purpose of this article is to provide examples of learning activities to be used as formative (interim) evaluation of an in-hospital orientation or cross-training program. Examples are provided in the form of vignettes that have been derived from strategies described in the literature as classroom assessment techniques. Although these classroom assessment techniques were originally designed for classroom experiences, they are proposed as methods for preceptors to stimulate the development of higher-order thinking such as synthesizing information, solving problems, and learning how to learn.
ERIC Educational Resources Information Center
Cook, Desmond L.
This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…
Cellular Mechanisms of Transcranial Direct Current Stimulation
2016-07-14
REPORT TYPE. State the type of report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group ...in fEPSP timing was not resolved. Importantly, grouping across all pathways (e.g. not controlling pathway selectivity), 8 V/m radial positive fields...each signal group during DCS and in control conditions (no electrical stimulation). F) Changes in synaptic strength for each signal group under all
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient
Bettie, Nirmal Famila
2017-01-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985
A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.
Bettie, Nirmal Famila
2017-11-01
Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
50 CFR 660.720 - Interim protection for sea turtles.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...
49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. (a) Private entities operating over-the-road buses, in addition to compliance with other applicable provisions of this part...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... assessable professional reported or required to be reported by a municipal advisor to the MSRB on Form A-11... Assessment and Form A-11- Interim. For purposes of the interim assessment, an assessable professional of a...-Interim as an assessable professional any associated person (i) Who otherwise qualifies as an assessable...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-15
... public comments for a planned Environmental Assessment. The Corps is directed to conduct a study of.... The study is structured as a series of interim reports. Interim Report IIIa, limited to the impacts of.... Comments are requested to assist in determining the level of analysis and impacts to be considered for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-28
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...
Application of Lanczos vectors to control design of flexible structures, part 2
NASA Technical Reports Server (NTRS)
Craig, Roy R., Jr.; Su, Tzu-Jeng
1992-01-01
This report covers the period of the grant from January 1991 until its expiration in June 1992. Together with an Interim Report (Ref. 9), it summarizes the research conducted under NASA Grant NAG9-357 on the topic 'Application of Lanczos Vectors to Control Design of Flexible Structures.' The research concerns various ways to obtain reduced-order mathematical models of complex structures for use in dynamics analysis and in the design of control systems for these structures. This report summarizes the research.
In vitro evaluation of the marginal integrity of CAD/CAM interim crowns.
Kelvin Khng, Kwang Yong; Ettinger, Ronald L; Armstrong, Steven R; Lindquist, Terry; Gratton, David G; Qian, Fang
2016-05-01
The accuracy of interim crowns made with computer-aided design and computer-aided manufacturing (CAD/CAM) systems has not been well investigated. The purpose of this in vitro study was to evaluate the marginal integrity of interim crowns made by CAD/CAM compared with that of conventional polymethylmethacrylate (PMMA) crowns. A dentoform mandibular left second premolar was prepared for a ceramic crown and scanned for the fabrication of 60 stereolithical resin dies, half of which were scanned to fabricate 15 Telio CAD-CEREC and 15 Paradigm MZ100-E4D-E4D crowns. Fifteen Caulk and 15 Jet interim crowns were made on the remaining resin dies. All crowns were cemented with Tempgrip under a 17.8-N load, thermocycled for 1000 cycles, placed in 0.5% acid fuschin for 24 hours, and embedded in epoxy resin before sectioning from the mid-buccal to mid-lingual surface. The marginal discrepancy was measured using a traveling microscope, and dye penetration was measured as a percentage of the overall length under the crown. The mean vertical marginal discrepancy of the conventionally made interim crowns was greater than for the CAD/CAM crowns (P=.006), while no difference was found for the horizontal component (P=.276). The mean vertical marginal discrepancy at the facial surface of the Caulk crowns was significantly greater than that of the other 3 types of interim crowns (P<.001). At the facial margin, the mean horizontal component of the Telio crowns was significantly larger than that of the other 3 types, with no difference at the lingual margins (P=.150). The mean percentage dye penetration for the Paradigm MZ100-E4D crowns was significantly greater and for Jet crowns significantly smaller than for the other 3 crowns (P<.001). However, the mean percentage dye penetration was significantly correlated with the vertical and horizontal marginal discrepancies of the Jet interim crowns at the facial surface and with the horizontal marginal discrepancies of the Caulk interim crowns at the lingual surface (P<.01 in each instance). A significantly smaller vertical marginal discrepancy was found with the interim crowns fabricated by CAD/CAM as compared with PMMA crowns; however, this difference was not observed for the horizontal component. The percentage dye penetration was correlated with vertical and horizontal discrepancies at the facial surface for the Jet interim crowns and with horizontal discrepancies at the lingual surface for the Caulk interim crowns. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
Adams, Hugo J A; Kwee, Thomas C
2016-10-01
This study aimed to systematically review and meta-analyze the prognostic value of interim (18)F-fluoro-2-deoxy-d-glucose positron emission tomography (FDG-PET) in diffuse large B-cell lymphoma (DLBCL) patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). MEDLINE and EMBASE were systematically searched for suitable studies. Included studies were methodologically appraised, and results were summarized both descriptively and meta-analytically. Nine studies, comprising a total of 996 R-CHOP-treated DLBCL patients, were included. Overall, studies were of moderate methodological quality. The area under the summary receiver operating curve (AUC) of interim FDG-PET in predicting treatment failure and death were 0.651 and 0.817, respectively. There was no heterogeneity in diagnostic odds ratios across available studies (I(2)=0.0%). At multivariable analysis, 2 studies reported interim FDG-PET to have independent prognostic value in addition to the International Prognostic Index (IPI) in predicting treatment failure, whereas 3 studies reported that this was not the case. One study reported interim FDG-PET to have independent prognostic value in addition to the IPI in predicting death, whereas 2 studies reported that this was not the case. In conclusion, interim FDG-PET in R-CHOP-treated DLBCL has some correlation with outcome, but its prognostic value is homogeneously suboptimal across studies and it has not consistently proven to surpass the prognostic potential of the IPI. Moreover, there is a lack of studies that compared interim FDG-PET to the recently developed and superior National Comprehensive Cancer Network-IPI. Therefore, at present there is no scientific base to support the clinical use of interim FDG-PET in R-CHOP-treated DLBCL. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
Walter, S D; Han, H; Briel, M; Guyatt, G H
2017-04-30
In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.
NASA Astrophysics Data System (ADS)
Ahmed, F.; Dousa, J.; Hunegnaw, A.; Teferle, F. N.; Bingley, R.
2017-12-01
Integrated water vapor (IWV) derived from climate reanalysis models, such as the European Centre for Medium-range Weather Forecasts (ECMWF) ReAnalysis-Interim (ERA-Interim), is widely used in many atmospheric applications. Therefore, it is of interest to assess the quality of this reanalysis product using available observations. Observations from Global Navigation Satellite Systems (GNSS) are, as of now, available for a period of over 2 decades and their global availability makes it possible to validate the IWV obtained from climate reanalysis models in different geographical and climatic regions. In this study, primarily, three 5-year long homogeneously reprocessed GNSS-derived IWV datasets containing over 400 globally distributed ground-based GNSS stations have been used to validate the IWV estimates obtained from the ERA-Interim climate reanalysis model in 25 different climate zones. The IWV from ERA-Interim has been obtained by vertically integrating the specific humidity at all model levels above the locations of GNSS stations. It has been studied how the difference between the ERA-Interim IWV and the GNSS-derived IWV varies with respect to the different climate zones as well as with respect to the difference in the model orography and latitude. The results show a dependence of the ability of ERA-Interim to model the IWV on difference in climate types and latitude. This dependence, however, is dictated by the concentration of water vapor in different climate zones and at different latitudes. Furthermore, as a secondary focus of this study, the weighted mean atmospheric temperature (Tm) obtained from ERA-Interim has been compared to its equivalent obtained using two widely used approximations globally.
NASA Technical Reports Server (NTRS)
Archer, J. L.; Beauchamp, N. A.; Day, C. F.
1975-01-01
The justification, economic and technological benefits of NASA Space Programs (aside from pure scientific objectives), in improving the quality of life in the United States is discussed and outlined. Specifically, a three-step, systematic method is described for selecting relevant and highly beneficial payloads and instruments for the Interim Upper Stage (IUS) that will be used with the space shuttle until the space tug becomes available. Viable Government and private industry cost-sharing strategies which would maximize the number of IUS payloads, and the benefits obtainable under a limited NASA budget were also determined. Charts are shown which list the payload instruments, and their relevance in contributing to such areas as earth resources management, agriculture, weather forecasting, and many others.
Reinforcement of a PMMA resin for interim fixed prostheses with silica nanoparticles.
Topouzi, Marianthi; Kontonasaki, Eleana; Bikiaris, Dimitrios; Papadopoulou, Lambrini; Paraskevopoulos, Konstantinos M; Koidis, Petros
2017-05-01
Fractures in long span provisional/interim restorations are a common complication. Adequate fracture toughness is necessary to resist occlusal forces and crack propagation, so these restorations should be constructed with materials of improved mechanical properties. The aim of this study was to investigate the possible reinforcement of neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles in a PMMA resin for fixed interim restorations. Composite PMMA-Silica nanoparticles powders were mixed with PMMA liquid and compact bar shaped specimens were fabricated according to the British standard BS EN ISO 127337:2005. The single-edge notched method was used to evaluate fracture toughness (three-point bending test), while the dynamic thermomechanical properties (Storage Modulus, Loss Modulus, tanδ) of a series of nanocomposites with different amounts of nanoparticles (0.25%, 0.50%, 0.75%, 1% w.t.) were evaluated. Statistical analysis was performed and the statistically significant level was set to p<0.05. The fracture toughness of all experimental composites was remarkably higher compared to control. There was a tendency to decrease of fracture toughness, by increasing the concentration of the filler. No statistically significant differences were detected among the modified/unmodified silica nanoparticles. Dynamic mechanical properties were also affected. By increasing the silica nanoparticles content an increase in Storage Modulus was recorded, while Glass Transition Temperature was shifted at higher temperatures. Under the limitations of this in-vitro study, it can be suggested that both neat silica nanoparticles and trietoxyvinylsilane-modified silica nanoparticles, especially at low concentrations, may enhance the overall performance of fixed interim prostheses, as can effectively increase the fracture toughness, the elastic modulus and the Glass Transition Temperature of PMMA resins used in fixed provisional restorations. Copyright © 2017 Elsevier Ltd. All rights reserved.
Damiani, Lucas Petri; Berwanger, Otavio; Paisani, Denise; Laranjeira, Ligia Nasi; Suzumura, Erica Aranha; Amato, Marcelo Britto Passos; Carvalho, Carlos Roberto Ribeiro; Cavalcanti, Alexandre Biasi
2017-01-01
Background The Alveolar Recruitment for Acute Respiratory Distress Syndrome Trial (ART) is an international multicenter randomized pragmatic controlled trial with allocation concealment involving 120 intensive care units in Brazil, Argentina, Colombia, Italy, Poland, Portugal, Malaysia, Spain, and Uruguay. The primary objective of ART is to determine whether maximum stepwise alveolar recruitment associated with PEEP titration, adjusted according to the static compliance of the respiratory system (ART strategy), is able to increase 28-day survival in patients with acute respiratory distress syndrome compared to conventional treatment (ARDSNet strategy). Objective To describe the data management process and statistical analysis plan. Methods The statistical analysis plan was designed by the trial executive committee and reviewed and approved by the trial steering committee. We provide an overview of the trial design with a special focus on describing the primary (28-day survival) and secondary outcomes. We describe our data management process, data monitoring committee, interim analyses, and sample size calculation. We describe our planned statistical analyses for primary and secondary outcomes as well as pre-specified subgroup analyses. We also provide details for presenting results, including mock tables for baseline characteristics, adherence to the protocol and effect on clinical outcomes. Conclusion According to best trial practice, we report our statistical analysis plan and data management plan prior to locking the database and beginning analyses. We anticipate that this document will prevent analysis bias and enhance the utility of the reported results. Trial registration ClinicalTrials.gov number, NCT01374022. PMID:28977255
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
49 CFR 1152.29 - Prospective use of rights-of-way for interim trail use and rail banking.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 8 2010-10-01 2010-10-01 false Prospective use of rights-of-way for interim trail... Governing Notice, Applications, Financial Assistance, Acquisition for Public Use, and Trail Use § 1152.29 Prospective use of rights-of-way for interim trail use and rail banking. (a) If any state, political...
Temps at the Top: Factors Related to the Appointment of Interim Community College Presidents
ERIC Educational Resources Information Center
Goff, Susan L.
2012-01-01
The appointment of interim community college presidents, the topic of this study, is a little understood phenomenon. A growing shortage of community college presidents coupled with a lack of replacements suggests the appointment of interims will continue well into the future. This study, with a purpose of looking at the factors related to the…
2008-07-17
OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.
ERIC Educational Resources Information Center
Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew
2009-01-01
The purpose of this exploratory study is to examine the use of interim assessments and the policy supports that promote use to improve instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that a) evaluate student knowledge and skills, typically within a limited…
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the Carbon...
76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... DEPARTMENT OF COMMERCE Patent and Trademark Office [Docket No. PTO-P-2011-0001] Grant of Interim... Office, Commerce. ACTION: Notice of interim patent term extension. SUMMARY: The United States Patent and... States Patent and Trademark Office. [FR Doc. 2011-2088 Filed 1-31-11; 8:45 am] BILLING CODE 3510-16-P ...
Interim Testing, Socio-Economic Status, and the Odds of Passing Grade 8 State Tests in New Jersey
ERIC Educational Resources Information Center
Babo, Gerard; Tienken, Christopher H.; Gencarelli, Maria A.
2014-01-01
A review of the literature pertaining to the effect and influence of commercially-prepared interim assessments in mathematics and language arts literacy reveals a lack of quantitative data to determine the value of these products for school reform. This study examined the ability of commercially-prepared interim pretest and posttest assessments in…
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
47 CFR 51.715 - Interim transport and termination pricing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... shall set interim transport and termination rates either at the default ceilings specified in § 51.705(c) or in accordance with a bill-and-keep methodology as defined in § 51.713. (3) In a state in which the... minute of use), and transport (as described in § 51.707(b)(2)). (c) An interim arrangement shall cease to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-11
...-indicator of the Capital Fund indicator to all PHAs for the Capital Fund Indicator under the PHAS interim... transition to the scoring system implemented by the PHAS interim rule, especially as relates to the indicator that assesses occupancy rate. The 5 points for the occupancy sub-indicator will be awarded for fiscal...
Lin, Wei-Shao; Harris, Bryan T; Pellerito, John; Morton, Dean
2018-04-30
This report describes a proof of concept for fabricating an interim complete removable dental prosthesis with a digital light processing 3-dimensional (3D) printer. Although an in-office 3D printer can reduce the overall production cost for an interim complete removable dental prosthesis, the process has not been validated with clinical studies. This report provided a preliminary proof of concept in developing a digital workflow for the in-office additively manufactured interim complete removable dental prosthesis. Copyright © 2018 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cummins, G.D.
This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of thismore » waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.« less
Interim analyses in 2 x 2 crossover trials.
Cook, R J
1995-09-01
A method is presented for performing interim analyses in long term 2 x 2 crossover trials with serial patient entry. The analyses are based on a linear statistic that combines data from individuals observed for one treatment period with data from individuals observed for both periods. The coefficients in this linear combination can be chosen quite arbitrarily, but we focus on variance-based weights to maximize power for tests regarding direct treatment effects. The type I error rate of this procedure is controlled by utilizing the joint distribution of the linear statistics over analysis stages. Methods for performing power and sample size calculations are indicated. A two-stage sequential design involving simultaneous patient entry and a single between-period interim analysis is considered in detail. The power and average number of measurements required for this design are compared to those of the usual crossover trial. The results indicate that, while there is minimal loss in power relative to the usual crossover design in the absence of differential carry-over effects, the proposed design can have substantially greater power when differential carry-over effects are present. The two-stage crossover design can also lead to more economical studies in terms of the expected number of measurements required, due to the potential for early stopping. Attention is directed toward normally distributed responses.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-09-01
This document describes the environmental monitoring program at the Hazelwood Interim Storage Site (HISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of HISS began in 1984 when the site was assigned to the US Department of Energy (DOE) as part of the decontamination research and development project authorized by Congress under the 1984 Energy and Water Development Appropriations Act. DOE placed responsibility for HISS under the Formerly Utilized Sites Remedial Action Program (FUSRAP), a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of themore » nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at HISS includes sampling networks for radon concentrations in air; external gamma radiation exposure; and radium-226, thorium-230, and total uranium concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards and DCGs are established to protect public health and the environment.« less
A Proposed Design for an Interim Space Rescue Ferry Vehicle.
1985-12-01
Mussack of the SOS Lab deserves credit for helping me to determine the effects of plume impingement on vehicle control. Jack Tiffany, head of the AFIT... Effective Thruster Forces .. .......... . 85 XV. Simulation Results--Solo MMU/Primary Control Mode ....... .................... 91 XVI. Simulation...will be made as explained in 2 and 3 (9:2-34--36). Figure 2.7 does not reflect the effects of a limb motion filter, which briefly delays AAH response
Assessment of Proposed Cab Glass Coating for FAA Control Towers
2015-11-16
report would be prepared after the initial coating and evaluation (with sprayed water) and then a final report after the 6 month study period to assess...Distribution A: Approved for public release. AFRL-RH-WP-TR-2015-0074 Assessment of Proposed Cab Glass Coating for FAA Control...REPORT TYPE Interim 3. DATES COVERED (From - To) 30 Jun 2014 – 1 Nov 2015 4. TITLE AND SUBTITLE Assessment of Proposed Cab Glass Coating
2016-07-29
This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.
32 CFR 733.3 - Information and policy on support of dependents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the child if physical control is obtained. (6) Adopted children. The natural parents of an adopted... parents. A Navy or Marine Corps member who contemplates the adoption of a child should be aware of the.... (iii) If custody of children of the marriage is divided between the two parents: interim support shall...
40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... base gasoline component, the detergent component, or the detergent-additized post-refinery component of... component of any post-refinery component or gasoline in the storage tank containing gasoline found to be in... evidence, that the gasoline or detergent carrier caused the violation. (2) Post-refinery component non...
Conley, Kathleen M; Majersik, Jennifer; Gonzales, Nicole R; Maddox, Katherine E; Pary, Jennifer K; Brown, Devin L; Moyé, Lemuel A; Espinosa, Nina; Grotta, James C; Morgenstern, Lewis B
2009-01-01
The KIDS (Kids Identifying and Defeating Stroke) Program is a three-year prospective, randomized, controlled, multiethnic school-based intervention study. Program goals include increasing knowledge of stroke signs and treatment and intention to immediately call 911 among Mexican American (MA) and non-Hispanic white (NHW) middle school students and their parents. This article describes the design, implementation and interim evaluation of this theory-based intervention. Intervention students received a culturally appropriate stroke education program divided into four 50-minute classes each year during the 6th, 7th, and 8th grades. Each class session also included a homework assignment that involved the students’ parents or other adult partners. Interim-test results indicate that this educational intervention was successful in improving students’ stroke symptom and treatment knowledge and intent to call 911 upon witnessing a stroke compared with controls (p<0.001). We conclude that this school-based educational intervention to reduce delay time to hospital arrival for stroke shows early promise. PMID:18332150
Huh, Warner K; Ault, Kevin A; Chelmow, David; Davey, Diane D; Goulart, Robert A; Garcia, Francisco A R; Kinney, Walter K; Massad, L Stewart; Mayeaux, Edward J; Saslow, Debbie; Schiffman, Mark; Wentzensen, Nicolas; Lawson, Herschel W; Einstein, Mark H
2015-02-01
In 2011, the American Cancer Society, the American Society for Colposcopy and Cervical Pathology, and the American Society for Clinical Pathology updated screening guidelines for the early detection of cervical cancer and its precursors. Recommended screening strategies were cytology or cotesting (cytology in combination with high-risk human papillomavirus [hrHPV] testing). These guidelines also addressed the use of hrHPV testing alone as a primary screening approach, which was not recommended for use at that time. There is now a growing body of evidence for screening with primary hrHPV testing, including a prospective U.S.-based registration study. Thirteen experts, including representatives from the Society of Gynecologic Oncology, the American Society for Colposcopy and Cervical Pathology, the American College of Obstetricians and Gynecologists, the American Cancer Society, the American Society of Cytopathology, the College of American Pathologists, and the American Society for Clinical Pathology, convened to provide interim guidance for primary hrHPV screening. This guidance panel was specifically triggered by an application to the U.S. Food and Drug Administration (FDA) for a currently marketed HPV test to be labeled for the additional indication of primary cervical cancer screening. Guidance was based on literature review and review of data from the FDA registration study, supplemented by expert opinion. This document aims to provide information for health care providers who are interested in primary hrHPV testing and an overview of the potential advantages and disadvantages of this strategy for screening as well as to highlight areas in need of further investigation.
ERIC Educational Resources Information Center
What Works Clearinghouse, 2015
2015-01-01
The study, "The Impact of Indiana's System of Interim Assessments on Mathematics and Reading," examined the effects of using Diagnostic Assessment Tools (DAT) on mathematics and reading outcomes for students in 59 Indiana schools during the 2009-10 academic year. DAT consists of interim assessment tools--Wireless Generation's mCLASS for…
ERIC Educational Resources Information Center
Immekus, Jason C.; Atitya, Ben
2016-01-01
Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously funded by the Bureau. 39.1100 Section 39.1100 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Pre-kindergarten Programs § 39.1100 Interim fiscal year...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Mark D.; Fritz, Brad G.; Mendoza, Donaldo P.
2008-07-11
Following an evaluation of potential Sr-90 treatment technologies and their applicability under 100-NR-2 hydrogeologic conditions, U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N Area will include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary (most likely phytoremediation). Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing Sr-90 flux to the river at a reasonable cost. In July 2005, aqueous injection, (i.e., the introduction of apatite-formingmore » chemicals into the subsurface) was endorsed as the interim remedy and selected for field testing. Studies are in progress to assess the efficacy of in situ apatite formation by aqueous solution injection to address both the vadose zone and the shallow aquifer along the 300 ft of shoreline where Sr-90 concentrations are highest. This report describes the field testing of the shallow aquifer treatment.« less
PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS
DOE Office of Scientific and Technical Information (OSTI.GOV)
MAY TH
The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less
The utility of Bayesian predictive probabilities for interim monitoring of clinical trials
Connor, Jason T.; Ayers, Gregory D; Alvarez, JoAnn
2014-01-01
Background Bayesian predictive probabilities can be used for interim monitoring of clinical trials to estimate the probability of observing a statistically significant treatment effect if the trial were to continue to its predefined maximum sample size. Purpose We explore settings in which Bayesian predictive probabilities are advantageous for interim monitoring compared to Bayesian posterior probabilities, p-values, conditional power, or group sequential methods. Results For interim analyses that address prediction hypotheses, such as futility monitoring and efficacy monitoring with lagged outcomes, only predictive probabilities properly account for the amount of data remaining to be observed in a clinical trial and have the flexibility to incorporate additional information via auxiliary variables. Limitations Computational burdens limit the feasibility of predictive probabilities in many clinical trial settings. The specification of prior distributions brings additional challenges for regulatory approval. Conclusions The use of Bayesian predictive probabilities enables the choice of logical interim stopping rules that closely align with the clinical decision making process. PMID:24872363
INTERIM -- Starlink Software Environment
NASA Astrophysics Data System (ADS)
Pearce, Dave; Pavelin, Cliff; Lawden, M. D.
Early versions of this paper were based on a number of other papers produced at a very early stage of the Starlink project. They contained a description of a specific implementation of a subroutine library, speculations on the desirable attributes of a software environment, and future development plans. They reflected the experimental nature of the Starlink software environment at that time. Since then, the situation has changed. The implemented subroutine library, INTERIM_DIR:INTERIM.OLB, is now a well established and widely used piece of software. A completely new Starlink software environment (ADAM) has been developed and distributed. Thus the library released in 1980 as `STARLINK' and now called `INTERIM' has reached the end of its development cycle and is now frozen in its current state, apart from bug corrections. This paper has, therefore, been completely rewritten and restructured to reflect the new situation. Its aim is to describe the facilities of the INTERIM subroutine library as clearly and concisely as possible. It avoids speculation, discussion of design decisions, and announcements of future plans.
[Hodgkin lymphoma: Current and future therapeutic strategies].
Turpin, Anthony; Michot, Jean-Marie; Kempf, Emmanuelle; Mazeron, Renaud; Dartigues, Peggy; Terroir, Marie; Boros, Angela; Bonnetier, Serge; Castilla-Llorente, Cristina; Coman, Tereza; Danu, Alina; Ghez, David; Pilorge, Sylvain; Arfi-Rouche, Julia; Dercle, Laurent; Soria, Jean-Charles; Carde, Patrice; Ribrag, Vincent; Fermé, Christophe; Lazarovici, Julien
2018-01-01
Hodgkin lymphoma (HL) is a cancer that mostly affects young people, in which modern therapeutic strategies using chemotherapy and radiotherapy result in a cure rate exceeding 80%. Survivors are exposed to long-term consequences of treatments, such as secondary malignancies and cardiovascular diseases, whose mortality exceeds the one of the disease itself, with long-term follow-up. The current therapeutic strategy in HL, based on the assessment of initial risk factors, is the result of large clinical trials led by the main international cooperating groups. More recently, several groups have tried to develop treatment strategies adapted to the response to chemotherapy, evaluated by interim PET/CT scan. However to date, the combined treatment with chemotherapy followed by radiation therapy remains a standard in most of the above-diaphragmatic localized forms. Immune checkpoint inhibitors, and especially anti-PD1 antibodies, have shown dramatic results in some serious forms of relapsed or refractory HL, with limited toxicity, and may contribute in the future to reduce the toxicities of treatments. Copyright © 2017 Société Française du Cancer. Published by Elsevier Masson SAS. All rights reserved.
Levin, Jennifer B; Sams, Johnny; Tatsuoka, Curtis; Cassidy, Kristin A; Sajatovic, Martha
2015-04-01
Medication nonadherence occurs in 20-60% of persons with bipolar disorder (BD) and is associated with serious negative outcomes, including relapse, hospitalization, incarceration, suicide and high healthcare costs. Various strategies have been developed to measure adherence in BD. This descriptive paper summarizes challenges and workable strategies using electronic medication monitoring in a randomized clinical trial (RCT) in patients with BD. Descriptive data from 57 nonadherent individuals with BD enrolled in a prospective RCT evaluating a novel customized adherence intervention versus control were analyzed. Analyses focused on whole group data and did not assess intervention effects. Adherence was assessed with the self-reported Tablets Routine Questionnaire and the Medication Event Monitoring System (MEMS). The majority of participants were women (74%), African American (69%), with type I BD (77%). Practical limitations of MEMS included misuse in conjunction with pill minders, polypharmacy, cost, failure to bring to research visits, losing the device, and the device impacting baseline measurement. The advantages were more precise measurement, less biased recall, and collecting data from past time periods for missed interim visits. Automated devices such as MEMS can assist investigators in evaluating adherence in patients with BD. Knowing the anticipated pitfalls allows study teams to implement preemptive procedures for successful implementation in BD adherence studies and can help pave the way for future refinements as automated adherence assessment technologies become more sophisticated and readily available.
An, Ming-Wen; Mandrekar, Sumithra J; Edelman, Martin J; Sargent, Daniel J
2014-07-01
The primary goal of Phase II clinical trials is to understand better a treatment's safety and efficacy to inform a Phase III go/no-go decision. Many Phase II designs have been proposed, incorporating randomization, interim analyses, adaptation, and patient selection. The Phase II design with an option for direct assignment (i.e. stop randomization and assign all patients to the experimental arm based on a single interim analysis (IA) at 50% accrual) was recently proposed [An et al., 2012]. We discuss this design in the context of existing designs, and extend it from a single-IA to a two-IA design. We compared the statistical properties and clinical relevance of the direct assignment design with two IA (DAD-2) versus a balanced randomized design with two IA (BRD-2) and a direct assignment design with one IA (DAD-1), over a range of response rate ratios (2.0-3.0). The DAD-2 has minimal loss in power (<2.2%) and minimal increase in T1ER (<1.6%) compared to a BRD-2. As many as 80% more patients were treated with experimental vs. control in the DAD-2 than with the BRD-2 (experimental vs. control ratio: 1.8 vs. 1.0), and as many as 64% more in the DAD-2 than with the DAD-1 (1.8 vs. 1.1). We illustrate the DAD-2 using a case study in lung cancer. In the spectrum of Phase II designs, the direct assignment design, especially with two IA, provides a middle ground with desirable statistical properties and likely appeal to both clinicians and patients. Copyright © 2014 Elsevier Inc. All rights reserved.
Voils, Corrine I; Levine, Erica; Gierisch, Jennifer M; Pendergast, Jane; Hale, Sarah L; McVay, Megan A; Reed, Shelby D; Yancy, William S; Bennett, Gary; Strawbridge, Elizabeth M; White, Allison C; Shaw, Ryan J
2018-02-01
The obesity epidemic has negative physical, psychological, and financial consequences. Despite the existence of effective behavioral weight loss interventions, many individuals do not achieve adequate weight loss, and most regain lost weight in the year following intervention. We report the rationale and design for a 2×2 factorial study that involves financial incentives for dietary self-monitoring (yes vs. no) and/or interim weight loss (yes vs. no). Outpatients with obesity participate in a 24-week, group-based weight loss intervention. All participants are asked to record their daily dietary and liquid intake on a smartphone application (app) and to weigh themselves daily at home on a study-provided cellular scale. An innovative information technology (IT) solution collates dietary data from the app and weight from the scale. Using these data, an algorithm classifies participants weekly according to whether they met their group's criteria to receive a cash reward ranging from $0 to $30 for dietary self-monitoring and/or interim weight loss. Notice of the reward is provided via text message, and credit is uploaded to a gift card. This pilot study will provide information on the feasibility of using this novel IT solution to provide variable-ratio financial incentives in real time via its effects on recruitment, intervention adherence, retention, and cost. This study will provide the foundation for a comprehensive, adequately-powered, randomized controlled trial to promote short-term weight loss and long-term weight maintenance. If efficacious, this approach could reduce the prevalence, adverse outcomes, and costs of obesity for millions of Americans. Clinicaltrials.gov registration: NCT02691260. Published by Elsevier Inc.
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2014 CFR
2014-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2011 CFR
2011-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2012 CFR
2012-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2010 CFR
2010-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).
Code of Federal Regulations, 2013 CFR
2013-04-01
... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...
Interim Report by Asia International Grid Connection Study Group
NASA Astrophysics Data System (ADS)
Omatsu, Ryo
2018-01-01
The Asia International Grid Connection Study Group Interim Report examines the feasibility of developing an international grid connection in Japan. The Group has investigated different cases of grid connections in Europe and conducted research on electricity markets in Northeast Asia, and identifies the barriers and challenges for developing an international grid network including Japan. This presentation introduces basic contents of the interim report by the Study Group.
Commentary: Interim leadership of academic departments at U.S. medical schools.
Grigsby, R Kevin; Aber, Robert C; Quillen, David A
2009-10-01
Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Jacobs
2011-02-01
Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less
Aggarwal, Swati P; Zinman, Lorne; Simpson, Elizabeth; McKinley, Jane; Jackson, Katherine E; Pinto, Hanika; Kaufman, Petra; Conwit, Robin A; Schoenfeld, David; Shefner, Jeremy; Cudkowicz, Merit
2010-05-01
In a pilot study, lithium treatment slowed progression of amyotrophic lateral sclerosis (ALS). We aimed to confirm or disprove these findings by assessing the safety and efficacy of lithium in combination with riluzole in patients with ALS. We did a double-blind, placebo-controlled trial with a time-to-event design. Between January and June, 2009, patients with ALS who were taking a stable dose of riluzole for at least 30 days were randomly assigned (1:1) by a centralised computer to receive either lithium or placebo. Patients, caregivers, investigators, and all site study staff with the exception of site pharmacists were masked to treatment assignment. The primary endpoint was the time to an event, defined as a decrease of at least six points on the revised ALS functional rating scale score or death. Interim analyses were planned for when 84 patients had been allocated treatment, 6 months later or after 55 events, and after 100 events. Analysis was by intention to treat. The stopping boundary for futility at the first interim analysis was a p value of at least 0.68. We used a log-rank test to compare the distributions of the time to an event between the lithium and placebo groups. This trial is registered with ClinicalTrials.gov, NCT00818389. At the first interim analysis, 22 of 40 patients in the lithium group had an event compared with 20 of 44 patients in the placebo group (log rank p=0.51). The hazard ratio of reaching the primary endpoint was 1.13 (95% CI 0.61-2.07). The study was stopped at the first interim analysis because criterion for futility was met (p=0.78). The difference in mean decline in the ALS functional rating scale score between the lithium group and the placebo group was 0.15 (95% CI -0.43 to 0.73, p=0.61). There were no major safety concerns. Falls (p=0.04) and back pain (p=0.05) were more common in the lithium group than in the placebo group. We found no evidence that lithium in combination with riluzole slows progression of ALS more than riluzole alone. The time-to-event endpoint and use of prespecified interim analyses enabled a clear result to be obtained rapidly. This design should be considered for future trials testing the therapeutic efficacy of drugs that are easily accessible to people with ALS. National Institute of Neurological Disorders and Stroke, ALS Association, and ALS Society of Canada. Copyright 2010 Elsevier Ltd. All rights reserved.
Beyond the Illusion of Symmetry: How to Think about Arms Control
1988-05-01
Proliferation Treaty of 1970, the ABM Treaty of 1972 and the SALT I Interim Offensive Agreement of 1972. (48:206) It is significant to point out as Joe...34destabilizing" aspects of the ABM system. (76:222) These are the fundamental principles of the next phase of arms control. The SALT Negotiations As...Emerging Soviet capabilities plus ABM and MIRV technologies seriously threatened strategic stability. As the Soviet jnion achieved strategic parity with
1990-05-01
curves ; test reports; test cylinders: samples, O&M manuals including parts lists; certifications; warranties and other such required submittals...purpose. 14.4.3. Authority and responsibilities of all quality control personnel. 14.4.4. Schedule of Use of inspection personnel by types and phase of...quality control program shall include four phases of inspection and tests. The Contracting Officer’s representative shall be notified at least 24
Mourning dove hunting regulation strategy based on annual harvest statistics and banding data
Otis, D.L.
2006-01-01
Although managers should strive to base game bird harvest management strategies on mechanistic population models, monitoring programs required to build and continuously update these models may not be in place. Alternatively, If estimates of total harvest and harvest rates are available, then population estimates derived from these harvest data can serve as the basis for making hunting regulation decisions based on population growth rates derived from these estimates. I present a statistically rigorous approach for regulation decision-making using a hypothesis-testing framework and an assumed framework of 3 hunting regulation alternatives. I illustrate and evaluate the technique with historical data on the mid-continent mallard (Anas platyrhynchos) population. I evaluate the statistical properties of the hypothesis-testing framework using the best available data on mourning doves (Zenaida macroura). I use these results to discuss practical implementation of the technique as an interim harvest strategy for mourning doves until reliable mechanistic population models and associated monitoring programs are developed.
ORNL Remedial Action Program strategy (FY 1987-FY 1992)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trabalka, J.R.; Myrick, T.E.
1987-12-01
Over 40 years of Oak Ridge National Laboratory (ORNL) operations have produced a diverse legacy of contaminated inactive facilities, research areas, and waste disposal areas that are potential candidates for remedial action. The ORNL Remedial Action Program (RAP) represents a comprehensive effort to meet new regulatory requirements and ensure adequate protection of on-site workers, the public, and the environment by providing appropriate corrective measures at over 130 sites contaminated historically with radioactive, hazardous chemical, or mixed wastes. A structured path of program planning, site characterization, alternatives assessment, technology development, engineering design, continued site maintenance and surveillance, interim corrective action, andmore » eventual site closure or decommissioning is required to meet these objectives. This report documents the development of the Remedial Action Program, through its preliminary characterization, regulatory interface, and strategy development activities. It provides recommendations for a comprehensive, long-term strategy consistent with existing technical, institutional, and regulatory information, along with a six-year plan for achieving its initial objectives. 53 refs., 8 figs., 12 tabs.« less
Wiersma, Tjerk
2016-01-01
The recently published Systolic Blood Pressure Intervention Trial (SPRINT) casts new light on the issue of lowering blood pressure to 120 mmHg. The trial randomized 9161 patients with systolic blood pressures of 130 mmHg - 180 mmHg and increased cardiovascular risk into a group receiving intensive treatment (target 120 mmHg) and a group given standard treatment (target 140 mmHg). The trial was stopped earlier than foreseen because interim analysis showed a lower incidence rate of myocardial infarction, stroke, heart failure and death from cardiovascular causes in the group given intensive treatment (1.65 versus 2.19 per year, hazard ratio 0.75; 95% CI 0.64-0.89; p < 0.001). These results open up the possibility of aiming for lower blood pressure targets in antihypertensive treatment. It is questionable whether this strategy would be preferred by every patient. New guidelines on cardiovascular risk management should pay more attention to shared decision-making where doctors inform patients about the benefits and risks of strict or less strict blood pressure control and patients choose personal targets.
ERIC Educational Resources Information Center
Shute, Valerie J.
Aptitude-treatment interactions (ATIs) refer to the covariation between learner characteristic and instructional treatment in relation to some outcome measure. To systematically test for ATI, an intelligent tutoring system instructing in basic principles of electricity was chosen as a complex but controlled learning task. Two learning environments…
ERIC Educational Resources Information Center
Lansman, Marcy, Ed.; Hunt, Earl, Ed.
This technical report contains papers prepared by the 11 speakers at the 1980 Lake Wilderness (Seattle, Washington) Conference on Attention. The papers are divided into general models, physiological evidence, and visual attention categories. Topics of the papers include the following: (1) willed versus automatic control of behavior; (2) multiple…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-27
... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...
Review of the Ontario Operating Grants Formula. Interim Report.
ERIC Educational Resources Information Center
Council of Ontario Universities, Toronto.
The Operating Grants Formula utilized by the Council of Ontario Universities, has as its sole purpose to provide an objective mechanism for determining the share of the total provincial operating grant to be allocated to each university. It is not intended to limit or control the expenditure of funds granted to the universities, but institutions…
A Study of Classroom Interaction and Thinking. Interim Report.
ERIC Educational Resources Information Center
Hudgins, Bryce B.; Ahlbrand, William P., Jr.
As a first step in a research effort directed toward formulation of a theory of instruction which would lead to prediction and control of classroom events, data related to teacher-pupil communication, student covert thinking, and teacher and pupil overt thinking was collected by two observers working over a 5-day period with each of nine junior…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, L.E.
1993-08-04
In October and November 1986, two secret U.S. Government operations were publicly exposed, potentially implicating Reagan Administration officials in illegal activities. These operations were the provision of assistance to the military activities of the Nicaraguan contra rebels during an October 1984 to October 1986 prohibition on such aid, and the sale of U.S. arms to Iran in contravention of stated U.S. policy and in possible violation of arms-export controls. In late November 1986, Reagan Administration officials announced that some of the proceeds from the sale of U.S. arms to Iran had been diverted to the contras. As a result, Attorneymore » General Edwin Meese III sought the appointment of an independent counsel to investigate and prosecute possible crimes. Volume II contains indictments, plea agreements, interim reports to Congress and administrative matters from that investigation.« less
NASA Technical Reports Server (NTRS)
Pepin, Gerard R.
1992-01-01
The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.
NASA Technical Reports Server (NTRS)
2002-01-01
The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.
Implementation of a low-cost Interim 21CFR11 compliance solution for laboratory environments.
Greene, Jack E
2003-01-01
In the recent past, compliance with 21CFR11 has become a major buzzword within the pharmaceutical and biotechnology industries. While commercial solutions exist, implementation and validation are expensive and cumbersome. Frequent implementation of new features via point releases further complicates purchasing decisions by making it difficult to weigh the risk of non-compliance against the costs of too frequent upgrades. This presentation discusses a low-cost interim solution to the problem. While this solution does not address 100% of the issues raised by 21CFR11, it does implement and validate: (1) computer system security; (2) backup and restore ability on the electronic records store; and (3) an automated audit trail mechanism that captures the date, time and user identification whenever electronic records are created, modified or deleted. When coupled with enhanced procedural controls, this solution provides an acceptable level of compliance at extremely low cost.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montano, Joshua Daniel
2015-03-23
Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interimmore » check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.« less
1982-05-07
The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.
The Archaeology of Coralville Lake, Iowa. Volume 4. Recreation Area Survey. (Interim Report 2).
1985-09-01
THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) p - [ JAN 1 4 1986 WAUWATOSA. WISCONSIN 86 1.13 117...THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA ; VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) Submitted To: Rock Island District Corps of Engineers...presents the results of intensive archaeological and geomorphic investigations at 14 special use or recreation areas at Coralville Lake, Iowa . The
2005-03-25
This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.
FY2017 Defense Spending Under an Interim Continuing Resolution (CR): In Brief
2016-09-16
rated based on the fraction of a year for which the interim CR is in effect . In recent fiscal years, the referenced funding level on which interim or...of the Federal Government: Causes, Processes, and Effects , coordinated by Clinton T. Brass. 8 Typically, such funding is specified as an annualized...congressional consideration of a CR to fund the federal government through the opening months of the fiscal year is widely anticipated. This report
Fenton, A H
1976-07-01
The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.
A computer-aided approach to nonlinear control systhesis
NASA Technical Reports Server (NTRS)
Wie, Bong; Anthony, Tobin
1988-01-01
The major objective of this project is to develop a computer-aided approach to nonlinear stability analysis and nonlinear control system design. This goal is to be obtained by refining the describing function method as a synthesis tool for nonlinear control design. The interim report outlines the approach by this study to meet these goals including an introduction to the INteractive Controls Analysis (INCA) program which was instrumental in meeting these study objectives. A single-input describing function (SIDF) design methodology was developed in this study; coupled with the software constructed in this study, the results of this project provide a comprehensive tool for design and integration of nonlinear control systems.
Predictive probability methods for interim monitoring in clinical trials with longitudinal outcomes.
Zhou, Ming; Tang, Qi; Lang, Lixin; Xing, Jun; Tatsuoka, Kay
2018-04-17
In clinical research and development, interim monitoring is critical for better decision-making and minimizing the risk of exposing patients to possible ineffective therapies. For interim futility or efficacy monitoring, predictive probability methods are widely adopted in practice. Those methods have been well studied for univariate variables. However, for longitudinal studies, predictive probability methods using univariate information from only completers may not be most efficient, and data from on-going subjects can be utilized to improve efficiency. On the other hand, leveraging information from on-going subjects could allow an interim analysis to be potentially conducted once a sufficient number of subjects reach an earlier time point. For longitudinal outcomes, we derive closed-form formulas for predictive probabilities, including Bayesian predictive probability, predictive power, and conditional power and also give closed-form solutions for predictive probability of success in a future trial and the predictive probability of success of the best dose. When predictive probabilities are used for interim monitoring, we study their distributions and discuss their analytical cutoff values or stopping boundaries that have desired operating characteristics. We show that predictive probabilities utilizing all longitudinal information are more efficient for interim monitoring than that using information from completers only. To illustrate their practical application for longitudinal data, we analyze 2 real data examples from clinical trials. Copyright © 2018 John Wiley & Sons, Ltd.
2014-01-01
Background Osteoporosis and vertebral fracture can have a considerable impact on an individual’s quality of life. There is increasing evidence that physiotherapy including manual techniques and exercise interventions may have an important treatment role. This pragmatic randomised controlled trial will investigate the clinical and cost-effectiveness of two different physiotherapy approaches for people with osteoporosis and vertebral fracture, in comparison to usual care. Methods/Design Six hundred people with osteoporosis and a clinically diagnosed vertebral fracture will be recruited and randomly allocated to one of three management strategies, usual care (control - A), an exercise-based physiotherapy intervention (B) or a manual therapy-based physiotherapy intervention (C). Those in the usual care arm will receive a single session of education and advice, those in the active treatment arms (B + C) will be offered seven individual physiotherapy sessions over 12 weeks. The trial is designed as a prospective, adaptive single-blinded randomised controlled trial. An interim analysis will be completed and if one intervention is clearly superior the trial will be adapted at this point to continue with just one intervention and the control. The primary outcomes are quality of life measured by the disease specific QUALLEFO 41 and the Timed Loaded Standing test measured at 1 year. Discussion There are a variety of different physiotherapy packages used to treat patients with osteoporotic vertebral fracture. At present, the indication for each different therapy is not well defined, and the effectiveness of different modalities is unknown. Trial registration Reference number ISRCTN49117867. PMID:24422876
Emery, Robert J
2012-11-01
Faced with the prospect of being unable to permanently dispose of low-level radioactive wastes (LLRW) generated from teaching, research, and patient care activities, component institutions of the University of Texas System worked collaboratively to create a dedicated interim storage facility to be used until a permanent disposal facility became available. Located in a remote section of West Texas, the University of Texas System Interim Storage Facility (UTSISF) was licensed and put into operation in 1993, and since then has provided safe and secure interim storage for up to 350 drums of dry solid LLRW at any given time. Interim storage capability provided needed relief to component institutions, whose on-site waste facilities could have possibly become overburdened. Experiences gained from the licensing and operation of the site are described, and as a new permanent LLRW disposal facility emerges in Texas, a potential new role for the storage facility as a surge capacity storage site in times of natural disasters and emergencies is also discussed.
Bartha, Erzsebet; Davidson, Thomas; Brodtkorb, Thor-Henrik; Carlsson, Per; Kalman, Sigridur
2013-07-09
A randomized, controlled trial, intended to include 460 patients, is currently studying peroperative goal-directed hemodynamic treatment (GDHT) of aged hip-fracture patients. Interim efficacy analysis performed on the first 100 patients was statistically uncertain; thus, the trial is continuing in accordance with the trial protocol. This raised the present investigation's main question: Is it reasonable to continue to fund the trial to decrease uncertainty? To answer this question, a previously developed probabilistic cost-effectiveness model was used. That model depicts (1) a choice between routine fluid treatment and GDHT, given uncertainty of current evidence and (2) the monetary value of further data collection to decrease uncertainty. This monetary value, that is, the expected value of perfect information (EVPI), could be used to compare future research costs. Thus, the primary aim of the present investigation was to analyze EVPI of an ongoing trial with interim efficacy observed. A previously developed probabilistic decision analytic cost-effectiveness model was employed to compare the routine fluid treatment to GDHT. Results from the interim analysis, published trials, the meta-analysis, and the registry data were used as model inputs. EVPI was predicted using (1) combined uncertainty of model inputs; (2) threshold value of society's willingness to pay for one, quality-adjusted life-year; and (3) estimated number of future patients exposed to choice between GDHT and routine fluid treatment during the expected lifetime of GDHT. If a decision to use GDHT were based on cost-effectiveness, then the decision would have a substantial degree of uncertainty. Assuming a 5-year lifetime of GDHT in clinical practice, the number of patients who would be subject to future decisions was 30,400. EVPI per patient would be €204 at a €20,000 threshold value of society's willingness to pay for one quality-adjusted life-year. Given a future population of 30,400 individuals, total EVPI would be €6.19 million. If future trial costs are below EVPI, further data collection is potentially cost-effective. When applying a cost-effectiveness model, statements such as 'further research is needed' are replaced with 'further research is cost-effective and 'further funding of a trial is justified'. ClinicalTrials.gov NCT01141894.
1984-12-01
system. The reconstruction process is Simply data fusion after allA data are in. After reconstruction, artifcial intelligence (Al) techniques may be...14. CATE OF fhPM~TVW MWtvt Ogv It PAWE COMN Interim __100 -_ TO December 1984 24 MILD ON" s-o Artificial intelligence Command control Data fusion...RD-Ai5O 867 RESEARCH NEEDS FOR ARTIFICIAL INTELLIGENCE APPLICATIONS i/i IN SUPPORT OF C3 (..(U) NAVAL OCEAN SVSTEIIS CENTER SAN DIEGO CA R R DILLARD
2016-02-08
This final rule adopts, without change, the interim final rule that was published in the Federal Register on October 27, 2015. The Drug Enforcement Administration is amending the table of Excluded Nonnarcotic Products to update the company name for the drug product Nasal Decongestant Inhaler/Vapor Inhaler (containing 50 milligrams levmetamfetamine) to Aphena Pharma Solutions--New York, LLC. This over-the-counter, nonnarcotic drug product is excluded from the provisions of the Controlled Substances Act.
2014-12-01
natural field setting. Leaf sheaths of native reed are looser and tend to fall off before winter. Ovipositing females might notice the difference and...Interim Report August-December 2014 Contract No. W911NF-14-1-0510 Project title: Complete host testing with a potential ...4. TITLE AND SUBTITLE Complete host testing with a potential biological control agent on common reed in view of submitting a petition for field
Orenstein, Lauren A V; Orenstein, Evan W; Teguete, Ibrahima; Kodio, Mamoudou; Tapia, Milagritos; Sow, Samba O; Levine, Myron M
2012-01-01
Maternal immunization has gained traction as a strategy to diminish maternal and young infant mortality attributable to infectious diseases. Background rates of adverse pregnancy outcomes are crucial to interpret results of clinical trials in Sub-Saharan Africa. We developed a mathematical model that calculates a clinical trial's expected number of neonatal and maternal deaths at an interim safety assessment based on the person-time observed during different risk windows. This model was compared to crude multiplication of the maternal mortality ratio and neonatal mortality rate by the number of live births. Systematic reviews of severe acute maternal morbidity (SAMM), low birth weight (LBW), prematurity, and major congenital malformations (MCM) in Sub-Saharan African countries were also performed. Accounting for the person-time observed during different risk periods yields lower, more conservative estimates of expected maternal and neonatal deaths, particularly at an interim safety evaluation soon after a large number of deliveries. Median incidence of SAMM in 16 reports was 40.7 (IQR: 10.6-73.3) per 1,000 total births, and the most common causes were hemorrhage (34%), dystocia (22%), and severe hypertensive disorders of pregnancy (22%). Proportions of liveborn infants who were LBW (median 13.3%, IQR: 9.9-16.4) or premature (median 15.4%, IQR: 10.6-19.1) were similar across geographic region, study design, and institutional setting. The median incidence of MCM per 1,000 live births was 14.4 (IQR: 5.5-17.6), with the musculoskeletal system comprising 30%. Some clinical trials assessing whether maternal immunization can improve pregnancy and young infant outcomes in the developing world have made ethics-based decisions not to use a pure placebo control. Consequently, reliable background rates of adverse pregnancy outcomes are necessary to distinguish between vaccine benefits and safety concerns. Local studies that quantify population-based background rates of adverse pregnancy outcomes will improve safety assessment of interventions during pregnancy.
CMM Interim Check Design of Experiments (U)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Montano, Joshua Daniel
2015-07-29
Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less
Establishing a Quality Control System for Stem Cell-Based Medicinal Products in China
2015-01-01
Stem cell-based medicinal products (SCMPs) are emerging as novel therapeutic products. The success of its development depends on the existence of an effective quality control system, which is constituted by quality control technologies, standards, reference materials, guidelines, and the associated management system in accordance with regulatory requirements along product lifespan. However, a worldwide, effective quality control system specific for SCMPs is still far from established partially due to the limited understanding of stem cell sciences and lack of quality control technologies for accurately assessing the safety and biological effectiveness of SCMPs before clinical use. Even though, based on the existing regulations and current stem cell sciences and technologies, initial actions toward the goal of establishing such a system have been taken as exemplified by recent development of new “interim guidelines” for governing quality control along development of SCMPs and new development of the associated quality control technologies in China. In this review, we first briefly introduced the major institutions involved in the regulation of cell substrates and therapeutic cell products in China and the existing regulatory documents and technical guidelines used as critical references for developing the new interim guidelines. With focus only on nonhematopoietic stem cells, we then discussed the principal quality attributes of SCMPs as well as our thinking of proper testing approaches to be established with relevant evaluation technologies to ensure all quality requirements of SCMPs along different manufacturing processes and development stages. At the end, some regulatory and technical challenges were also discussed with the conclusion that combined efforts should be taken to promote stem cell regulatory sciences to establish the effective quality control system for SCMPs. PMID:25471126
Remediation management of complex sites using an adaptive site management approach.
Price, John; Spreng, Carl; Hawley, Elisabeth L; Deeb, Rula
2017-12-15
Complex sites require a disproportionate amount of resources for environmental remediation and long timeframes to achieve remediation objectives, due to their complex geologic conditions, hydrogeologic conditions, geochemical conditions, contaminant-related conditions, large scale of contamination, and/or non-technical challenges. A recent team of state and federal environmental regulators, federal agency representatives, industry experts, community stakeholders, and academia worked together as an Interstate Technology & Regulatory Council (ITRC) team to compile resources and create new guidance on the remediation management of complex sites. This article summarizes the ITRC team's recommended process for addressing complex sites through an adaptive site management approach. The team provided guidance for site managers and other stakeholders to evaluate site complexities and determine site remediation potential, i.e., whether an adaptive site management approach is warranted. Adaptive site management was described as a comprehensive, flexible approach to iteratively evaluate and adjust the remedial strategy in response to remedy performance. Key aspects of adaptive site management were described, including tools for revising and updating the conceptual site model (CSM), the importance of setting interim objectives to define short-term milestones on the journey to achieving site objectives, establishing a performance model and metrics to evaluate progress towards meeting interim objectives, and comparing actual with predicted progress during scheduled periodic evaluations, and establishing decision criteria for when and how to adapt/modify/revise the remedial strategy in response to remedy performance. Key findings will be published in an ITRC Technical and Regulatory guidance document in 2017 and free training webinars will be conducted. More information is available at www.itrc-web.org. Copyright © 2017 Elsevier Ltd. All rights reserved.
NASA Technical Reports Server (NTRS)
Kitzis, J. L.; Kitzis, S. N.
1979-01-01
The brightness temperature data produced by the SMMR final Antenna Pattern Correction (APC) algorithm is discussed. The algorithm consisted of: (1) a direct comparison of the outputs of the final and interim APC algorithms; and (2) an analysis of a possible relationship between observed cross track gradients in the interim brightness temperatures and the asymmetry in the antenna temperature data. Results indicate a bias between the brightness temperature produced by the final and interim APC algorithm.
French Interim MALE UAV Program
2003-09-02
MINISTÈRE DE LA DÉFENSE June, 13th 2002 Lcl Monsterleet FAF Staff J. Caron EADS S&DE-ISR FRENCH INTERIM MALE UAV PROGRAM 4 INDUSTRIAL STATUS Report...2003 2. REPORT TYPE N/A 3. DATES COVERED - 4. TITLE AND SUBTITLE French Interim Male UAV Program 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) EADS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlson, T.A., Fluor Daniel Hanford
1997-02-06
The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-20
... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Digital I&C Systems The ACRS Subcommittee on Digital Instrumentation and Controls (I&C) Systems...: Wednesday, September 8, 2010--8:30 a.m. until 12 p.m. The Subcommittee will review Digital I&C Interim Staff...