Sample records for interim final technical

  1. Jet Crackle

    DTIC Science & Technology

    2015-06-23

    DISTRIBUTION/AVAILABILITY STATEMENT DISTRIBUTION A 13. SUPPLEMENTARY NOTES 14. ABSTRACT Fighter jets and other aircraft with high specific thrust engines...interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc. 3. DATES COVERED. Indicate the time during which the...State the type of report, such as final, technical, interim, memorandum, master’s thesis , progress, quarterly, research, special, group study, etc

  2. 75 FR 6839 - Technical Service Provider Assistance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-12

    ... Executive Order 12866, the Office of Management and Budget determined that this final rule is not a... or are eligible to participate in conservation programs to help them make land management decisions...: Covered Programs. The interim final rule incorporated reference to the Agricultural Management Assistance...

  3. Tribal child welfare. Interim final rule.

    PubMed

    2012-01-06

    The Administration for Children and Families (ACF) is issuing this interim final rule to implement statutory provisions related to the Tribal title IV-E program. Effective October 1, 2009, section 479B(b) of the Social Security Act (the Act) authorizes direct Federal funding of Indian Tribes, Tribal organizations, and Tribal consortia that choose to operate a foster care, adoption assistance and, at Tribal option, a kinship guardianship assistance program under title IV-E of the Act. The Fostering Connections to Success and Increasing Adoptions Act of 2008 requires that ACF issue interim final regulations which address procedures to ensure that a transfer of responsibility for the placement and care of a child under a State title IV-E plan to a Tribal title IV-E plan occurs in a manner that does not affect the child's eligibility for title IV-E benefits or medical assistance under title XIX of the Act (Medicaid) and such services or payments; in-kind expenditures from third-party sources for the Tribal share of administration and training expenditures under title IV-E; and other provisions to carry out the Tribal-related amendments to title IV-E. This interim final rule includes these provisions and technical amendments necessary to implement a Tribal title IV-E program.

  4. 75 FR 25110 - Inmate Communication With News Media: Removal of Byline Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-07

    ... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 540 [BOP-1149] RIN 1120-AB49 Inmate Communication With News Media: Removal of Byline Regulations AGENCY: Bureau of Prisons, Justice Department. ACTION: Interim final rule; technical correction. [[Page 25111

  5. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final

    EPA Pesticide Factsheets

    This document provides guidance to site managers and Remedial Project Managers who are legally responsible for the management of a site on how to design and conduct technically defensible ecological risk assessments for the Superfund program.

  6. Transportation Systems Center Bibliography of Technical Reports, July 1970 - December 1976,

    DTIC Science & Technology

    1977-04-01

    Systems Center. AD-733-763 Judith Gertler, Herbert Glynn, Vivian Hobbs, Frederick Interim Report. June 1971. 16p. Woolfall. AD-733-764 Air Traffic Control...of Deployment Cost Analysis .. .......... FAA-76-20 Airspace Control Environmnent Simulator - Final Report.... ............ .. TSC-131.3 *All- Wether

  7. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  8. Parameter identification for nonlinear aerodynamic systems

    NASA Technical Reports Server (NTRS)

    Pearson, Allan E.

    1993-01-01

    This final technical report covers a three and one-half year period preceding February 28, 1993 during which support was provided under NASA Grant NAG-1-1065. Following a general description of the system identification problem and a brief survey of methods to attack it, the basic ideas behind the approach taken in this research effort are presented. The results obtained are described with reference to the published work, including the five semiannual progress reports previously submitted and two interim technical reports.

  9. 75 FR 14323 - Requirements for Implementing Sections 1512, 1605, and 1606 of the American Recovery and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ... sections of the interim final guidance at 2 CFR part 176 that pertain to international agreements. These amendments reflect changes with respect to U.S. international obligations since the publication of the... international agreements. First, it makes a technical correction to section 176.90(a). Second, it changes the...

  10. 75 FR 81843 - Amendments to Regulations Regarding Eligibility for a Medicare Prescription Drug Subsidy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ..., during regular business hours, by arranging with the contact person identified below. FOR FURTHER... interim final rule, we invite your comments on how to make rules easier to understand. For example: [[Page... diagrams? What else could we do to make the rule easier to understand? Does the rule contain technical...

  11. Medicare Program; Cancellation of Advancing Care Coordination Through Episode Payment and Cardiac Rehabilitation Incentive Payment Models; Changes to Comprehensive Care for Joint Replacement Payment Model: Extreme and Uncontrollable Circumstances Policy for the Comprehensive Care for Joint Replacement Payment Model. Final rule; interim final rule with comment period.

    PubMed

    2017-12-01

    This final rule cancels the Episode Payment Models (EPMs) and Cardiac Rehabilitation (CR) Incentive Payment Model and rescinds the regulations governing these models. It also implements certain revisions to the Comprehensive Care for Joint Replacement (CJR) model, including: Giving certain hospitals selected for participation in the CJR model a one-time option to choose whether to continue their participation in the model; technical refinements and clarifications for certain payment, reconciliation and quality provisions; and a change to increase the pool of eligible clinicians that qualify as affiliated practitioners under the Advanced Alternative Payment Model (Advanced APM) track. An interim final rule with comment period is being issued in conjunction with this final rule in order to address the need for a policy to provide some flexibility in the determination of episode costs for providers located in areas impacted by extreme and uncontrollable circumstances.

  12. Cyberspace, the 7th Joint Function for 21st Century Warfare

    DTIC Science & Technology

    2017-03-31

    such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research, special, group study, etc . 3. DATE COVERED...procedures, e.g. RD/FRD, PROPIN, ITAR, etc . Include copyright information. 13. SUPPLEMENTARY NOTES. Enter information not included...elsewhere such as: prepared in cooperation with; translation of; report supersedes; old edition number, etc . 14. ABSTRACT. A brief (approximately

  13. SUSTAINABLE ALLOY DESIGN: SEARCHING FOR RARE EARTH ELEMENT ALTERNATIVES THROUGH CRYSTAL ENGINEERING

    DTIC Science & Technology

    2016-02-26

    Property Maps to Guide Materials Design via Statistical Learning Summer Research Group Meeting – Materials by Design Los Alamos National Laboratory, July...Informatics, Rational design , Quantitative correlative spectroscopy and imaging, DFT, In situ high pressure mechanical property measurements, Superalloy...final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the

  14. Development of a Curriculum to Meet Changing Manpower Needs of the Computer and Business Machine Industries; Interim Developments. Final Report.

    ERIC Educational Resources Information Center

    Lescarbeau, Roland F.; And Others

    This suggested curriculum guide represents the consensus of opinion by the representatives of seven schools comprising the Technical Education Consortium, with advice of industrial experts concerning the essential educational needs of the technicians they would employ. It will serve as a guide to schools planning to institute a program applicable…

  15. 76 FR 78977 - Real Estate Settlement Procedures Act (Regulation X)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ...Title X of the Dodd-Frank Wall Street Reform and Consumer Protection Act (Dodd-Frank Act) transferred rulemaking authority for a number of consumer financial protection laws from seven Federal agencies to the Bureau of Consumer Financial Protection (Bureau) as of July 21, 2011. The Bureau is in the process of republishing the regulations implementing those laws with technical and conforming changes to reflect the transfer of authority and certain other changes made by the Dodd-Frank Act. In light of the transfer of the Department of Housing and Urban Development's (HUD's) rulemaking authority for the Real Estate Settlement Procedures Act (RESPA) to the Bureau, the Bureau is publishing for public comment an interim final rule establishing a new Regulation X (Real Estate Settlement Procedures Act). This interim final rule does not impose any new substantive obligations on persons subject to the existing Regulation X, previously published by HUD.

  16. Quantum Manybody Physics with Rydberg Polaritons

    DTIC Science & Technology

    2016-06-22

    report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...for public release. Over the course of this grant, we have seen tremendous progress, both theoretically and experimentally , in our control of photonic...shown in multiple stages of construction at left and below, spans three optical tables in two rooms: One for the experimental control system

  17. Combinational Optimal Stopping Problems

    DTIC Science & Technology

    2016-04-01

    such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...Vinel, A. and P. Krokhmal (2015) Certainty equivalent measures of risk, Annals of Operations Research , DOI:10.1007/s10479-015-1801-0. [3] Chernikov...Operations Research , 50(3):415–423, 2002. [16] I. Ljubi, P. Mutzel, and B. Zey. Stochastic survivable network design problems. Electronic Notes in Discrete

  18. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  19. Health care fraud and abuse data collection program: technical revisions to healthcare integrity and protection data bank data collection activities. Interim final rule with comment period.

    PubMed

    2004-06-17

    The rule makes technical changes to the Healthcare Integrity and Protection Data Bank (HIPDB) data collection reporting requirements set forth in 45 CFR part 61 by clarifying the types of personal numeric identifiers that may be reported to the data bank in connection with adverse actions. Specifically, the rule clarifies that in lieu of a Social Security Number (SSN), an individual taxpayer identification number (ITIN) may be reported to the data bank when, in those limited situations, an individual does not have an SSN.

  20. The New Guard: A Service-Equivalent Force

    DTIC Science & Technology

    2012-06-07

    quartermas ter , medical , ordinance and inspector general. The bureaus were designed to be more efficient and deliver cost aving; but. onl y created...2. REPORT TYPE. State the type of report, such as final , technical, interim, memorandum, master’s thesis , progress, quarterly, research ...the report, performing the research , or credited with the content of the report. The form of entry is the last name, first name, middle initial, and

  1. Cellular Mechanisms of Transcranial Direct Current Stimulation

    DTIC Science & Technology

    2016-07-14

    REPORT TYPE. State the type of report, such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group ...in fEPSP timing was not resolved. Importantly, grouping across all pathways (e.g. not controlling pathway selectivity), 8 V/m radial positive fields...each signal group during DCS and in control conditions (no electrical stimulation). F) Changes in synaptic strength for each signal group under all

  2. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  3. Office of Inspector General; Medicare and state health care programs: fraud and abuse; issuance of advisory opinions by the OIG. Final rule.

    PubMed

    2008-07-17

    OIG is adopting in final form, without change, an interim final rule published on March 26, 2008 (73 FR 15937). We received no comments to the interim final rule. The interim final rule revised the process for advisory opinion requestors to submit payments for advisory opinion costs.

  4. United States Air Force F-35A Operational Basing Environmental Impact Statement. Appendix E: Comments

    DTIC Science & Technology

    2013-09-01

    such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research ...negatively impacted by the noise] SAFTY ALL NEW military aircraft designs suffer crashes during their initial development peri~ Bringing the F-35

  5. Functions and requirements document for interim store solidified high-level and transuranic waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith-Fewell, M.A., Westinghouse Hanford

    1996-05-17

    The functions, requirements, interfaces, and architectures contained within the Functions and Requirements (F{ampersand}R) Document are based on the information currently contained within the TWRS Functions and Requirements database. The database also documents the set of technically defensible functions and requirements associated with the solidified waste interim storage mission.The F{ampersand}R Document provides a snapshot in time of the technical baseline for the project. The F{ampersand}R document is the product of functional analysis, requirements allocation and architectural structure definition. The technical baseline described in this document is traceable to the TWRS function 4.2.4.1, Interim Store Solidified Waste, and its related requirements, architecture,more » and interfaces.« less

  6. National School Lunch Program and School Breakfast Program: Nutrition Standards for All Foods Sold in School as Required by the Healthy, Hunger-Free Kids Act of 2010. Final rule and interim final rule.

    PubMed

    2016-07-29

    This rule adopts as final, with some modifications, the National School Lunch Program and School Breakfast Program regulations set forth in the interim final rule published in the Federal Register on June 28, 2013. The requirements addressed in this rule conform to the provisions in the Healthy, Hunger-Free Kids Act of 2010 regarding nutrition standards for all foods sold in schools, other than food sold under the lunch and breakfast programs. Most provisions of this final rule were implemented on July 1, 2014, a full year subsequent to publication of the interim final rule. This was in compliance with section 208 of the Healthy, Hunger-Free Kids Act of 2010, which required that State and local educational agencies have at least one full school year from the date of publication of the interim final rule to implement the competitive food provisions. Based on comments received on the interim final rule and implementation experience, this final rule makes a few modifications to the nutrition standards for all foods sold in schools implemented on July 1, 2014. In addition, this final rule codifies specific policy guidance issued after publication of the interim rule. Finally, this rule retains the provision related to the standard for total fat as interim and requests further comment on this single standard.

  7. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  8. United States Air Force F-35A Operational Basing Environmental Impact Statement. Appendix E: Comments

    DTIC Science & Technology

    2013-09-01

    studies such as this one, and other research conducted in most recent decade. Of course, the housing designation ("not compatible with residential...such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research

  9. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  10. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  11. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13 Ground and Launch Systems Processing B Panel 2: Robotics, Communications, and Navigation TA04 Robotics, TeleRobotics, and Autonomous Systems TA05 Communication and Navigation Systems C Panel 3: Instruments and Computing TA08 Science Instruments, Observatories, and Sensor Systems TA11 Modeling, Simulation, Information Technology, and Data Processing D Panel 4: Human Health and Surface Exploration TA06 Human Health, Life Support, and Habitation Systems TA07 Human Exploration Destination Systems E Panel 5: Materials Panel TA10 Nanotechnology TA12 Materials, Structures, Mechanical Systems, and Manufacturing TA14 Thermal Management Systems F Panel 6: Entry, Descent, and Landing Panel TA09 Entry, Descent, and Landing Systems In addition to drawing on the expertise represented on the steering committee and panels, the committee obtained input from each of 14 public workshops held on each of the 14 roadmaps. At these 1-day workshops, invited speakers, guests, and members of the public engaged in discussions on the different technology areas and their value to NASA. Broad community input was also solicited from a public website, where more than 240 public comments were received on the draft roadmaps in response to application of criteria (such as benefit, risk and reasonableness, and alignment with NASA and national goals) that the steering committee established. This interim report reflects the results of deliberations by the steering committee in light of these public inputs as well as additional inputs from the six panels. The steering committee's final report will be completed early in 2012. That report will prioritize the technologies that span the entire scope of the 14 roadmaps and provide additional guidance on crosscutting themes and other relevant topics.

  12. United States Air Force F-35A Operational Basing Environmental Impact Statement. Appendix E: Comments

    DTIC Science & Technology

    2013-09-01

    hreatens the well being of our community, whether through noi se and emissions or the risk of accidents from an under- test ed and flawed design . The...such as final, technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED...appear in the report, e.g. 001; AFAPL30480105. 6. AUTHOR(S). Enter name(s) of person(s) responsible for writing the report, performing the research

  13. Plutonium storage criteria

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chung, D.; Ascanio, X.

    1996-05-01

    The Department of Energy has issued a technical standard for long-term (>50 years) storage and will soon issue a criteria document for interim (<20 years) storage of plutonium materials. The long-term technical standard, {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides,{close_quotes} addresses the requirements for storing metals and oxides with greater than 50 wt % plutonium. It calls for a standardized package that meets both off-site transportation requirements, as well as remote handling requirements from future storage facilities. The interim criteria document, {open_quotes}Criteria for Interim Safe Storage of Plutonium-Bearing Solid Materials{close_quotes}, addresses requirements for storing materials with less thanmore » 50 wt% plutonium. The interim criteria document assumes the materials will be stored on existing sites, and existing facilities and equipment will be used for repackaging to improve the margin of safety.« less

  14. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  15. Elimination of exemptions for chemical mixtures containing the list I chemicals ephedrine and/or pseudoephedrine. Final rule.

    PubMed

    2008-07-10

    The Drug Enforcement Administration (DEA) is finalizing, without change, the Interim Rule with Request for Comment published in the Federal Register on July 25, 2007 (72 FR 40738). The Interim Rule removed the Controlled Substances Act (CSA) exemptions for chemical mixtures containing ephedrine and/or pseudoephedrine with concentration limits at or below five percent. Upon the effective date of the Interim Rule, all ephedrine and pseudoephedrine chemical mixtures, regardless of concentration and form, became subject to the regulatory provisions of the CSA. DEA regulated the importation, exportation, manufacture, and distribution of these chemical mixtures by requiring persons who handle these chemical mixtures to register with DEA, maintain certain records common to business practice, and file certain reports, regarding these chemical mixtures. No comments to the Interim Rule were received. This Final Rule finalizes the Interim Rule without change.

  16. 75 FR 13680 - Commutation of Sentence: Technical Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... Sentence: Technical Change AGENCY: Bureau of Prisons, Justice. ACTION: Interim rule. SUMMARY: This document makes a minor technical change to the Bureau of Prisons (Bureau) regulations on sentence commutation to.... Commutation of Sentence: Technical Change This document makes a minor technical change to the Bureau...

  17. The Predictive Validity of Interim Assessment Scores Based on the Full-Information Bifactor Model for the Prediction of End-of-Grade Test Performance

    ERIC Educational Resources Information Center

    Immekus, Jason C.; Atitya, Ben

    2016-01-01

    Interim tests are a central component of district-wide assessment systems, yet their technical quality to guide decisions (e.g., instructional) has been repeatedly questioned. In response, the study purpose was to investigate the validity of a series of English Language Arts (ELA) interim assessments in terms of dimensionality and prediction of…

  18. 78 FR 53038 - Interim Final Determination to Stay and Defer Sanctions; California; San Joaquin Valley

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0534; FRL-9900-36-Region 9.... Environmental Protection Agency (EPA). ACTION: Interim final rule. SUMMARY: EPA is making an interim [email protected] . Mail or deliver: Frances Wicher (AIR-2), U.S. Environmental Protection Agency Region 9...

  19. Evaluation and analysis of Seasat-A scanning multichannel Microwave Radiometer (SMMR) Antenna Pattern Correction (APC) algorithm

    NASA Technical Reports Server (NTRS)

    Kitzis, J. L.; Kitzis, S. N.

    1979-01-01

    The brightness temperature data produced by the SMMR final Antenna Pattern Correction (APC) algorithm is discussed. The algorithm consisted of: (1) a direct comparison of the outputs of the final and interim APC algorithms; and (2) an analysis of a possible relationship between observed cross track gradients in the interim brightness temperatures and the asymmetry in the antenna temperature data. Results indicate a bias between the brightness temperature produced by the final and interim APC algorithm.

  20. 24 CFR 115.209 - Technical assistance.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Technical assistance. 115.209... Substantially Equivalent Agencies § 115.209 Technical assistance. (a) The Assistant Secretary, through the FHEO regional office, may provide technical assistance to the interim and certified agencies at any time. The...

  1. 7 CFR 652.4 - Technical service standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... must approve all new technologies and innovative practices, including interim standards and specifications, prior to a TSP initiating technical services for those technologies and practices. (c) A TSP must...

  2. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  3. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  4. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  5. 75 FR 77721 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-47; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ...-019 Morgan. Self-Certification (Interim). V Uniform Suspension and 2009-036 Gary. Debarment Requirement (Interim). VI Limitation on Pass-Through 2008-031 Chambers. Charges. VII Technical Amendments....104-1, 5.601, 7.105, and 10.002. Dated: November 24, 2010. Millisa Gary, Acting Director, Acquisition...

  6. 75 FR 77745 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-47; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Business 2009-019 Morgan. Self-Certification (Interim). V Uniform Suspension and 2009-036 Gary. Debarment Requirement (Interim). VI Limitation on Pass-Through 2008-031 Chambers. Charges. VII Technical Amendments... 10.002. Dated: November 24, 2010. Millisa Gary, Acting Director, Acquisition Policy Division. [FR Doc...

  7. 5 CFR 308.101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...

  8. 5 CFR 308.101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...

  9. 5 CFR 308.101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...

  10. 5 CFR 308.101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Definitions. In this part: Student is an individual who is enrolled not less than half-time in a high school, trade school, technical or vocational institute, junior college, college, university or other accredited... interim between school years if the interim is not more than 5 months and if such individual shows to the...

  11. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part I.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    The interim report presents an evaluation of TADS (Technical Assistance Development System) through case studies of TADS technical assistance to the staffs of two demonstration programs for preschool handicapped children and their families. Purposes of the study included obtaining indepth descriptions of the technical assistance process to…

  12. Final Report: Characterization of Canister Mockup Weld Residual Stresses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Enos, David; Bryan, Charles R.

    2016-12-01

    Stress corrosion cracking (SCC) of interim storage containers has been indicated as a high priority data gap by the Department of Energy (DOE) (Hanson et al., 2012), the Electric Power Research Institute (EPRI, 2011), the Nuclear Waste Technical Review Board (NWTRB, 2010a), and the Nuclear Regulatory Commission (NRC, 2012a, 2012b). Uncertainties exist in terms of the environmental conditions that prevail on the surface of the storage containers, the stress state within the container walls associated both with weldments as well as within the base metal itself, and the electrochemical properties of the storage containers themselves. The goal of the workmore » described in this document is to determine the stress states that exists at various locations within a typical storage canister by evaluating the properties of a full-diameter cylindrical mockup of an interim storage canister. This mockup has been produced using the same manufacturing procedures as the majority of the fielded spent nuclear fuel interim storage canisters. This document describes the design and procurement of the mockup and the characterization of the stress state associated with various portions of the container. It also describes the cutting of the mockup into sections for further analyses, and a discussion of the potential impact of the results from the stress characterization effort.« less

  13. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  14. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Reserve Select for certain members of the selected reserve; Transitional Assistance Management Program; early eligibility for TRICARE for certain reserve component members. Interim final rule with comment period.

    PubMed

    2005-03-16

    This interim final rule establishes requirements and procedures for implementation of TRICARE Reserve Select. It also revises requirements and procedures for the Transitional Assistance Management Program. In addition, it establishes requirements and procedures for implementation of the earlier TRICARE eligibility for certain reserve component members. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  15. Use of materials derived from cattle in human food and cosmetics; reopening of the comment period. Interim final rule; reopening of the comment period.

    PubMed

    2013-03-04

    The Food and Drug Administration (FDA or ``we'') is reopening the comment period for the interim final rule entitled "Use of Materials Derived From Cattle in Human Food and Cosmetics'' that published in the Federal Register of July 14, 2004 (69 FR 42256). The interim final rule prohibited the use of certain cattle material to address the potential risk of bovine spongiform encephalopathy (BSE) in human food, including dietary supplements, and cosmetics. In the Federal Register of September 7, 2005 (70 FR 53063), we amended the interim final rule to make changes, including providing that the small intestine of cattle, formerly prohibited cattle material, could be used in human food and cosmetics if the distal ileum was removed by a specified procedure or one that the establishment could demonstrate is equally effective in ensuring complete removal of the distal ileum. Since 2005, peer-reviewed studies have been published showing the presence of infectivity in the proximal ileum, jejunum, ileocecal junction, and colon of cattle with BSE. Therefore, we are reopening the comment period for the interim final rule to give interested parties an opportunity to comment on the new studies concerning infectivity in parts of the small intestine other than the distal ileum.

  16. 76 FR 19909 - International Terrorism Victim Expense Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ... 1121-AA78 International Terrorism Victim Expense Reimbursement Program AGENCY: Office of Justice... promulgating this interim-final rule for its International Terrorism Victim Expense Reimbursement Program... international terrorism. DATES: Effective date: This interim-final rule is effective April 11, 2011. Comment...

  17. 76 FR 8366 - Science Advisory Board Staff Office; Request for Nominations; SAB Environmental Justice Technical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-14

    ... Nominations; SAB Environmental Justice Technical Panel AGENCY: Environmental Protection Agency (EPA). ACTION... experts to serve on the SAB Environmental Justice Technical (EJT) Panel. DATES: Nominations should be...) released the Interim Guidance on Considering Environmental Justice During the Development of an Action...

  18. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MAY TH

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revisionmore » includes information on additional feed tanks.« less

  19. 76 FR 71465 - Defense Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ... Government procurement. Mary Overstreet, Editor, Defense Acquisition Regulations System. Interim Rule Adopted... Federal Acquisition Regulation Supplement: Management of Manufacturing Risk in Major Defense Acquisition...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the...

  20. 76 FR 43571 - Small Business HUBZone Program; Government Contracting Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 126 RIN 3245-AG45 Small Business HUBZone Program; Government Contracting Programs AGENCY: U.S. Small Business Administration. ACTION: Interim final rule with request for comments. SUMMARY: This interim final rule amends the U.S. Small Business Administration's...

  1. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  2. Medicare program; changes to the Medicare claims appeal procedures; continuation of effectiveness and extension of timeline for publication of final rule. Interim final rule with comment period; continuation of effectiveness and extension of timeline for publication of final rule.

    PubMed

    2009-02-27

    This notice announces the continuation of effectiveness of a Medicare interim final rule with comment period and the extension of the timeline for publication of the final rule. This notice is issued in accordance with section 1871(a)(3)(C) of the Social Security Act (the Act), which allows an interim final rule to remain in effect after the expiration of the timeline specified in section 1871(a)(3)(B) of the Act (the "regular timeline") or, if applicable, at the end of each succeeding 1-year extension to the regular timeline, if prior to the expiration of the timeline, the Secretary publishes in the Federal Register a notice of continuation and explains why the regular timeline or any subsequent extension was not complied with.

  3. The WFIRST Interim Design Reference Mission: Capabilities, Constraints, and Open Questions

    NASA Technical Reports Server (NTRS)

    Kruk, Jeffrey W.

    2012-01-01

    The Project Office and Science Definition Team for the Wide-Field Infrared Survey Telescope (WFIRST) are in the midst of a pre-Phase A study to establish a Design Reference Mission (DRM). An Interim report was released in June 2011, with a final report due later in 2012. The predicted performance of the Interim DRM Observatory will be described, including optical quality, observing efficiency, and sensitivity for representative observing scenarios. Observing constraints and other limitations on performance will also be presented, with an emphasis on potential Guest Observer programs. Finally, a brief status update will be provided on open trade studies of interest to the scientific community. The final DRM may differ from the Interim DRM presented here. However, the underlying requirements of the scientific programs are not expected to change, hence the capabilities of the IDRM are likely to be maintained even if the implementation changes in significant ways.

  4. 75 FR 63655 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation, Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Administration (HRSA), HHS. ACTION: Interim final rule with request for comments. SUMMARY: The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of...

  5. Revised Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule

    EPA Pesticide Factsheets

    This is the revised version of the Interim Final Consolidated Enforcement Response and Penalty Policy for the Pre-Renovation Education Rule; Renovation, Repair and Painting Rule; and Lead-Based Paint Activities Rule.

  6. 76 FR 78465 - Home Mortgage Disclosure (Regulation C)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... 44 U.S.C. 1510. #0; #0;The Code of Federal Regulations is sold by the Superintendent of Documents. #0... Mortgage Disclosure (Regulation C) AGENCY: Bureau of Consumer Financial Protection. ACTION: Interim final... a new Regulation C (Home Mortgage Disclosure). This interim final rule does not impose any new...

  7. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  8. Exceptions or alternatives to labeling requirements for products held by the Strategic National Stockpile. Final rule.

    PubMed

    2012-02-06

    The Food and Drug Administration (FDA) is adopting as a final rule, without change, the interim final rule that issued regulations permitting FDA Center Directors to grant exceptions or alternatives to certain regulatory labeling requirements applicable to human drugs, biological products, or medical devices that are or will be included in the Strategic National Stockpile (SNS). FDA is taking this action to complete the rulemaking initiated with the interim final rule.

  9. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  10. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCACO8000 L16100000 DX0000] Notice of..., California AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Establishment of Interim Final Supplementary Rules. SUMMARY: In accordance with the Record of Decision for the Sierra Resource Management Plan...

  11. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  12. Health insurance issuers implementing medical loss ratio (MLR) requirements under the Patient Protection and Affordable Care Act. Interim final rule with request for comments.

    PubMed

    2010-12-01

    This document contains the interim final regulation implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act, as added by the Patient Protection and Affordable Care Act (Affordable Care Act).

  13. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  14. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  15. 78 FR 59726 - Interim Final Appendix D of OMB Circular No. A-123, “Management's Responsibility for Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-27

    ... OFFICE OF MANAGEMENT AND BUDGET Interim Final Appendix D of OMB Circular No. A-123, ``Management's Responsibility for Internal Control,'' and Suspension of Application of OMB Circular No. A-127, ``Financial Management Systems'' September 27, 2013. ACTION: Notice. SUMMARY: OMB Circular No. A-123, ``Management's...

  16. Federal enforcement in group and individual health insurance markets. Final rule.

    PubMed

    2005-11-25

    This rule makes final an interim final rule that details procedures we use for enforcing title XXVII of the Public Health Service Act as added by the Health Insurance Portability and Accountability Act of 1996, and as amended by the Mental Health Parity Act of 1996, the Newborns' and Mothers' Health Protection Act of 1996, and the Women's Health and Cancer Rights Act of 1998. Specifically, we are responsible for enforcing title XXVII requirements in States that do not enact the legislation necessary to enforce those requirements, or otherwise fail to substantially enforce the requirements. We are also responsible for taking enforcement actions against non-Federal governmental plans. The regulation describes the process we use in both enforcement contexts. This final rule deletes an appendix to the interim rule that listed examples of violations of title XXVII and corrects the description of a cross-reference, but makes no substantive changes to the interim final rule.

  17. Medicare program; FY 2014 inpatient prospective payment systems: changes to certain cost reporting procedures related to disproportionate share hospital uncompensated care payments. Interim final rule with comment period.

    PubMed

    2013-10-03

    : In the fiscal year (FY) 2014 inpatient prospective payment systems (IPPS)/long-term care hospital (LTCH) PPS final rule, we established the methodology for determining the amount of uncompensated care payments made to hospitals eligible for the disproportionate share hospital (DSH) payment adjustment in FY 2014 and a process for making interim and final payments. This interim final rule with comment period revises certain operational considerations for hospitals with Medicare cost reporting periods that span more than one Federal fiscal year and also makes changes to the data that will be used in the uncompensated care payment calculation in order to ensure that data from Indian Health Service (IHS) hospitals are included in Factor 1 and Factor 3 of that calculation.

  18. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  19. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS, MODULE 3: SITE CHARACTERIZATION AND SAMPLING GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  20. 76 FR 56708 - Ohio: Final Authorization of State Hazardous Waste Management Program Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-14

    .... January 4, 1989, 54 FR 246.... NESHAPS: Final Standards for May 14, 2001, 66 FR 24270..... OAC 3745-50-41...; Checklist 188.1. NESHAPS: Interim Standards for February 13, 2002, 67 FR 6792. OAC 3745-50-44; 3745-50-66... Waste Combustors 2009. (Interim Standards Rule); Checklist 197. NESHAPS: Standards for Hazardous...

  1. Publications of the Jet Propulsion Laboratory, January - December 1973. [bibliography

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Five classes of publications are included in this bibliography: (1) Technical Reports in which the information is complete for a specific accomplishment and is intended for a wide audience. (2) Articles from the bimonthly Deep Space Network Progress Report. Each volume's collection of articles presents a periodical survey of current accomplishments by the Deep Space Network. (3) Technical Memorandums, in which the information is complete for a specific accomplishment but is intended for a limited audience to satisfy unique requirements. (4) Articles from the JPL Quarterly Technical Review. Each article summarizes a recent important development, interim or final results, or an advancement in the state of the art in a scientific or engineering endeavor, This publication has been discontinued, and the issues indexed in this bibliography are the last to be published. (5) Articles published in the open literature. The publications are indexed by: (1) author, (2) subject, and (3) publication type and number. A descriptive entry appears under the name of each author of each publication; an abstract is included with the entry for the primary (first-listed) author.

  2. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Retired Reserve for members of the Retired Reserve. Interim final rule with comment period.

    PubMed

    2010-08-06

    This interim final rule establishes requirements and procedures for implementation of TRICARE Retired Reserve. This interim final rule addresses provisions of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10). The purpose of this interim final rule is to establish the TRICARE Retired Reserve program that implements section 705 of the NDAA-10. Section 705 allows members of the Retired Reserve who are qualified for non-regular retirement, but are not yet 60 years of age, to qualify to purchase medical coverage equivalent to the TRICARE Standard (and Extra) benefit unless that member is either enrolled in, or is eligible to enroll in, a health benefit plan under Chapter 89 of Title 5, United States Code, as well as certain survivors. The amount of the premium that qualified members pay to purchase these benefits will represent the full cost as determined on an appropriate actuarial basis for coverage under the TRICARE Standard (and Extra) benefit including the cost of the program administration. There will be one premium for member-only coverage and a separate premium for member and family coverage. The rules and procedures otherwise outlined in Part 199 of 32 CFR relating to the operation and administration of the TRICARE Standard and Extra programs including the required cost-shares, deductibles and catastrophic caps for retired members and their dependents will apply to this program. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates.

  3. 75 FR 8013 - Serve America Act Amendments to the National and Community Service Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... implement changes to the operation of the National Service Trust under the Serve America Act. This proposed... Corporation issued an interim final rule to implement time-sensitive changes to the Corporation's AmeriCorps... changes resulting from the interim final rule were required as a result of amendments to the NCSA and DVSA...

  4. THE EDUCATION AND EMPLOYMENT OF TECHNICIANS. INTERIM REPORT.

    ERIC Educational Resources Information Center

    BJORKQUIST, DAVID C., ED.

    THE TECHNICAL MANPOWER CONFERENCE, HELD AT THE PENNSYLVANIA STATE UNIVERSITY CAMPUS ON JANUARY 24 AND 25, 1968, WAS THE FIRST PHASE IN THE DISSEMINATION OF THE RESEARCH PROJECT, "EFFECTS OF FIELD AND JOB ORIENTED TECHNICAL RETRAINING ON MANPOWER UTILIZATION OF THE UNEMPLOYED." THE PRESENTATIONS IN PART I, INTENDED TO PROVIDE BACKGROUND…

  5. Radon Reduction Techniques in Schools: Interim Technical Guidance.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    This technical document is intended to assist school facilities maintenance personnel in the selection, design, and operation of radon reduction systems in schools. The guidance contained in this document is based largely on research conducted in 1987 and 1988 in schools located in Maryland and Virginia. Researchers from the United States…

  6. 78 FR 52680 - Amendment to the International Traffic in Arms Regulations: Registration and Licensing of Brokers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-26

    ...The Department of State is issuing this interim final rule amending the International Traffic in Arms Regulations (ITAR) relating to brokers and brokering activities and to related provisions of the ITAR. These amendments clarify registration requirements, the scope of brokering activities, prior approval requirements and exemptions, procedures for obtaining prior approval and guidance, and reporting and recordkeeping of such activities. Conforming and technical changes are made to other parts of the ITAR that affect export as well as brokering activities. The revisions contained in this rule are part of the Department of State's retrospective plan under E.O. 13563 completed on August 17, 2011.

  7. Medicaid program; home and community-based services waivers for individuals age 65 or older--HCFA. Interim final rule with comment period.

    PubMed

    1992-06-30

    This interim final rule amends current Medicaid regulations to permit States to offer, under a Secretarial waiver, a wide array of home and community-based services to individuals age 65 or older who are determined, but for the provision of these services, to be likely to require the level of care furnished in a skilled nursing facility (SNF) or intermediate care facility (ICF) (nursing facility (NF) effective October 1, 1990). The rule allows Federal payment for these and other long term care services, up to an amount specified in section 1915(d)(5)(B) of the Social Security Act, subject to HCFA's approval of the States' requests for waivers and certain assurances made by the States. Once granted, waivers are in effect for 3 years, unless terminated by the State with notice to the Secretary, and are renewable for periods of 5 years. Periodic evaluation, assessment, and review of the care furnished under the waivers is required. This rule implements section 4102 of the Omnibus Budget Reconciliation Act of 1987, as modified by section 411(k) of the Medicare Catastrophic Coverage Act of 1988, section 8432 of the Technical and Miscellaneous Revenue Act of 1988, and section 4741(b) of the Omnibus Budget Reconciliation Act of 1990. This rule is being issued in final and, for the most part, without a delay in the effective date for the reasons explained in section IV, "Waiver of Proposed Rulemaking and Delay in the Effective Date."

  8. Supporting evaluation for the proposed plan for final remedial action for the groundwater operable unit at the chemical plant area of the Weldon Spring Site, Weldon Spring, Missouri.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2003-08-06

    This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less

  9. The Impacts of Upward Bound Math-Science on Postsecondary Outcomes 7-9 Years after Scheduled High School Graduation: Final Report

    ERIC Educational Resources Information Center

    Seftor, Neil S.; Calcagno, Juan Carlos

    2010-01-01

    This final report updates the report "Upward Bound Math-Science: Program Description and Interim Impact Estimates" published in 2007 (Olsen et al. 2007). The 2007 interim report contained descriptive findings from a survey of Upward Bound Math-Science (UBMS) grantees from the late 1990s at the time of the study's initiation and impact estimates…

  10. Progress and future direction for the interim safe storage and disposal of Hanford high-level waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinzer, J.E.; Wodrich, D.D.; Bacon, R.F.

    This paper describes the progress made at the largest environmental cleanup program in the United States. Substantial advances in methods to start interim safe storage of Hanford Site high-level wastes, waste characterization to support both safety- and disposal-related information needs, and proceeding with cost-effective disposal by the U.S. Department of Energy (DOE) and its Hanford Site contractors, have been realized. Challenges facing the Tank Waste Remediation System (TWRS) Program, which is charged with the dual and parallel missions of interim safe storage and disposal of the high-level tank waste stored at the Hanford Site, are described. In these times ofmore » budget austerity, implementing an ongoing program that combines technical excellence and cost effectiveness is the near-term challenge. The technical initiatives and progress described in this paper are made more cost effective by DOE`s focus on work force productivity improvement, reduction of overhead costs, and reduction, integration and simplification of DOE regulations and operations requirements to more closely model those used in the private sector.« less

  11. User Selection of Purchased Information Services. Interim Technical Report (June 1975-January 1976).

    ERIC Educational Resources Information Center

    Hall, Homer J.

    Interviews conducted in the first phase of a project to develop a method for user selection of purchased scientific and technical information services identified a number of relationship among different populations of users. Research scientists, engineers, and patent attorneys want convenient access to original data identified in the search.…

  12. Federal Employees Health Benefits Program and Federal Employees Dental and Vision Insurance Program: eligibility for Pathway Programs participants. Interim final rule with request for comments.

    PubMed

    2014-01-06

    The U.S. Office of Personnel Management (OPM) is issuing an interim final regulation to update the Federal Employees Health Benefits Program (FEHBP) and the Federal Employees Dental and Vision Insurance Program (FEDVIP) regulations to reflect updated election opportunities for participants in the Pathways Programs. The Pathways Programs were created by Executive Order (E.O.) 13562, signed by the President on December 27, 2010, and are designed to enable the Federal Government to compete effectively for students and recent graduates by improving its recruitment efforts through internships and similar programs with Federal agencies. This interim final rule furthers these recruitment and retention efforts by providing health insurance, as well as dental and vision benefits, to eligible program participants and their families.

  13. Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

    NASA Technical Reports Server (NTRS)

    Hicken, Steve

    1990-01-01

    Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

  14. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  15. Evaluation of Searching and Rescue (SAR) Method For Determining Local Wind Current

    DTIC Science & Technology

    1991-07-01

    JUL 10 1992 ("= Research ajJ Development Centerto 1082 Shennecossett Road . - Groton, CT 06340-6096 INTERIM REPORT July 1991 This document is...United States Coast Guard Research and Development Center 1082 Shennecossett Road Groton, CT 06340-6096 V ’C . l •• mU. Technical Report Documentation...Grant No. 1082 Shennecossett Road Groton, Connecticut 06340-6096 13. Type of Report and Period Covered 12. Sponsoring Agency Name and Address INTERIM

  16. 75 FR 31609 - Conservation Stewardship Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ...Section 2301 of the Food, Conservation, and Energy Act of 2008 (2008 Act) amended the Food Security Act of 1985 to establish the Conservation Stewardship Program (CSP). On July 29, 2009, the Natural Resources Conservation Service (NRCS) published an interim final rule for CSP with a 60-day public comment period. On September 21, 2009, the public comment period was extended 30 days. NRCS is publishing a final rule that addresses the comments received on the interim final rule and makes other minor adjustments to improve clarity of the rule.

  17. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  18. 76 FR 12550 - Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim final rule... related to the provisioning of supplemental oxygen inside lavatories. This action is necessitated by other mandatory actions that temporarily render such oxygen systems inoperative. DATES: This interim rule is...

  19. Proceedings of the Lake Wilderness Attention Conference. Interim Technical Report, August 1, 1980 through September 30, 1980.

    ERIC Educational Resources Information Center

    Lansman, Marcy, Ed.; Hunt, Earl, Ed.

    This technical report contains papers prepared by the 11 speakers at the 1980 Lake Wilderness (Seattle, Washington) Conference on Attention. The papers are divided into general models, physiological evidence, and visual attention categories. Topics of the papers include the following: (1) willed versus automatic control of behavior; (2) multiple…

  20. Interim Joint Technical Assessment Report: Light-Duty Vehicle Greenhouse Gas Emission Standards and Corporate Average Fuel Economy Standards for Model Years 2017-2025

    EPA Pesticide Factsheets

    EPA and the NHTSA collaborated with CARB on this joint Technical Assessment Report to build on the success of the first phase of the National Program to regulate fuel economy and greenhouse gas (GHG) emissions from U.S. light-duty vehicles.

  1. Performance of Retrained Airmen in Air Force Technical Schools (Revised). Interim Report for Period January 1981-August 1982.

    ERIC Educational Resources Information Center

    Skinner, Mary J.; Alley, William E.

    Research was conducted to determine the effect of changing occupational specialties on the performance of Air Force retrained enlistees attending basic technical schools. The academic performance and attrition rates of approximately 20,000 retrainees and 230,000 nonprior-service enlistees (nonretrainees) attending 272 schools were compared.…

  2. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  3. Grants and cooperative agreements to state and local governments, universities, hospitals, and other non-profit organizations--USDA. Interim final rule.

    PubMed

    1997-08-29

    This interim final rule amendment is issued to implement the Single Audit Act Amendments of 1996 (Public Law 104-156, 110 Stat. 1396) and the June 24, 1997, revision of OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations" and to replace the existing audit requirements that are superseded by Public Law 104-156 and the revised A-133.

  4. Health information technology: initial set of standards, implementation specifications, and certification criteria for electronic health record technology. Interim final rule.

    PubMed

    2010-01-13

    The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  5. Hazardous waste management programs; Florida: authorization for interim authorization phase I--Environmental Protection Agency. Notice of final determination.

    PubMed

    1982-05-07

    The State of Florida has applied for interim Authorization Phase I. EPA has reviewed Florida's application for Phase I and has determined that Florida's hazardous waste program is substantially equivalent to the Federal program covered by Phase I. The State of Florida is, hereby, granted Interim Authorization for Phase I to operate the State 's hazardous waste program, in lieu of the Federal program.

  6. 75 FR 41381 - Private Land Mobile Radio Services

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ...] Private Land Mobile Radio Services AGENCY: Federal Communications Commission. ACTION: Final rule. SUMMARY... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile... to the January 1, 2011 interim deadlines associated with the narrowbanding of private land mobile...

  7. 76 FR 72623 - Literacy Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... INFORMATION: This document finalizes the Bureau's Literacy Program regulations, published as an interim rule... DEPARTMENT OF JUSTICE Bureau of Prisons 28 CFR Part 544 [BOP-1036-F] RIN 1120-AA33 Literacy... Bureau's Literacy Program regulations, published as an interim rule on September 26, 1997 (62 FR 50791...

  8. 77 FR 11385 - Security Considerations for Lavatory Oxygen Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Considerations for Lavatory Oxygen Systems AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Interim... considerations for lavatory oxygen systems (77 FR 12550). The interim final rule addresses a security... oxygen systems installed inside the lavatories of most transport category airplanes. As a result, the FAA...

  9. Interim overdentures.

    PubMed

    Fenton, A H

    1976-07-01

    The construction of an interim overdenture using existing removable partial dentures with natural tooth crowns and artificial teeth can be a simple and economical method of providing patients with dentures while tissues heal and teeth are prepared and restored. A more definite prognosis for both the patient and his remaining dentition can be established before the final overdenture is completed. The procedures necessary to provide three types of interim overdentures have been outlined. Patients tolerate this method of changing their dentitions extremely well.

  10. Applied Reading Test--Forms A and B, Interim Manual, and Answer Sheets.

    ERIC Educational Resources Information Center

    Australian Council for Educational Research, Hawthorn.

    Designed for use in the selection of apprentices, trainees, technical and trade personnel, and any other persons who need to read and understand text of a technical nature, this Applied Reading Test specimen set contains six passages and 32 items, has a 30-minute time limit, and is presented in a reusable multiple choice test booklet. The specimen…

  11. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Final rule.

    PubMed

    2006-09-22

    This final rule adopts the substance of the April 15, 2004 tentative interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment allows certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This final rule also requires that nursing facilities at least install battery-operated single station smoke alarms in resident rooms and common areas if they are not fully sprinklered or they do not have system-based smoke detectors in those areas. Finally, this final rule confirms as final the provisions of the March 25, 2005 interim final rule with changes and responds to public comments on that rule.

  12. TRICARE; changes included in the National Defense Authorization Act for fiscal year 2005; TRICARE Dental Program. Interim final rule.

    PubMed

    2005-09-21

    The Department is publishing this interim final rule to implement sections 711 and 715 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA-05), Public Law 108-375. Specifically, that legislation makes young dependents of deceased Service members eligible for enrollment in the TRICARE Dental Program when the child was not previously enrolled because of age, and authorizes post-graduate dental residents in a dental treatment facility of the uniformed services under a graduate dental education program accredited by the American Dental Association to provide dental treatment to dependents who are 12 years of age or younger and who are covered by a dental plan established under 10 U.S.C. 1076a. This rule also corrects certain references in 32 CFR 199.13. The rule is being published as an interim final rule with comment period in order to comply with statutory effective dates. Public comments are invited and will be considered for possible revisions to the final rule.

  13. Implementation of the Ryan Haight Online Pharmacy Consumer Protection Act of 2008. Interim final rule with request for comments.

    PubMed

    2009-04-06

    The Ryan Haight Online Pharmacy Consumer Protection Act, which was enacted on October 15, 2008, amended the Controlled Substances Act and Controlled Substances Import and Export Act by adding several new provisions to prevent the illegal distribution and dispensing of controlled substances by means of the Internet. DEA is hereby issuing an interim rule to amend its regulations to implement the legislation and is requesting comments on the interim rule.

  14. Grant Closeout Requirements and Reports

    Cancer.gov

    Requirements and reports to comply with grant closeout, including Final Federal Financial Report (FFR, SF425); Final Research Performance Progress Report (FRPPR); Interim Research Performance Progress Report (IRPPR); Final Invention Statement (FIS, HHS

  15. 78 FR 38843 - Single Application Option

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Application Option AGENCY: U.S. Copyright Office, Library of Congress. ACTION: Interim final rule. SUMMARY: The U.S. Copyright Office is amending its regulations on an interim basis in order to establish a new... an additional option for individual authors/claimants registering a single (one) work that is not a...

  16. 42 CFR 110.83 - Payment of all benefits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Secretary determines the mechanism of payment of Program benefits. She may choose to pay any benefits under... Secretary has the discretion to make interim payments of benefits under this Program, even before a final... only in exceptional cases. The Secretary may, for example, make an interim payment of medical benefits...

  17. 78 FR 24331 - Apricots Grown in Designated Counties in Washington; Temporary Suspension of Handling Regulations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Docket No. AMS-FV-12-0028... Regulations AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule... the marketing order for apricots grown in designated Counties in Washington. The interim rule...

  18. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  19. 77 FR 13831 - Health Information Technology: Standards, Implementation Specifications, and Certification...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...Under section 3004 of the Public Health Service Act, the Secretary of Health and Human Services is proposing to revise the initial set of standards, implementation specifications, and certification criteria adopted in an interim final rule published on January 13, 2010, and a subsequent final rule that was published on July 28, 2010, as well as to adopt new standards, implementation specifications, and certification criteria. The proposed new and revised certification criteria would establish the technical capabilities and specify the related standards and implementation specifications that Certified Electronic Health Record (EHR) Technology would need to include to, at a minimum, support the achievement of meaningful use by eligible professionals, eligible hospitals, and critical access hospitals under the Medicare and Medicaid EHR Incentive Programs beginning with the EHR reporting periods in fiscal year and calendar year 2014. This notice of proposed rulemaking also proposes revisions to the permanent certification program for health information technology, which includes changing the program's name.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frenkel, G.; Paterson, T.S.; Smith, M.E.

    The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less

  1. Air/Superfund national technical guidance study series, Volume 2. Estimation of baseline air emission at Superfund sites. Interim report(Final)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1989-01-01

    This volume is one in a series of manuals prepared for EPA to assist its Remedial Project Managers in the assessment of the air contaminant pathway and developing input data for risk assessment. The manual provides guidance on developing baseline-emission estimates from hazardous waste sites. Baseline-emission estimates (BEEs) are defined as emission rates estimated for a site in its undisturbed state. Specifically, the manual is intended to: Present a protocol for selecting the appropriate level of effort to characterize baseline air emissions; Assist site managers in designing an approach for BEEs; Describe useful technologies for developing site-specific baseline emission estimatesmore » (BEEs); Help site managers select the appropriate technologies for generating site-specific BEEs.« less

  2. Interim Exceptional Events Rule Frequently Asked Questions

    EPA Pesticide Factsheets

    Air agencies and other stakeholders have raised technical questions and issues related to implementation since the EPA promulgated the EER. This Question and Answer (Q&A) document is intended to respond to some of these frequently asked questions.

  3. 76 FR 17159 - Office of New Reactors; Final Interim Staff Guidance on Standard Review Plan, Section 17.4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... Interim Staff Guidance on Standard Review Plan, Section 17.4, ``Reliability Assurance Program'' AGENCY... design reliability assurance program (RAP). This ISG updates the guidance provided to the staff in Standard Review Plan (SRP), Section 17.4, ``Reliability Assurance Program,'' of NUREG-0800, ``Standard...

  4. Interim Particulate Matter Test Method for the Determination of Particulate Matter from Gas Turbine Engines, SERDP Project WP-1538 Final Report

    EPA Science Inventory

    Under Project No. WP-1538 of the Strategic Environmental Research and Development Program, the U. S. Air Force's Arnold Engineering Development Center (AEDC) is developing an interim test method for non-volatile particulate matter (PM) specifically for the Joint Strike Fighter (J...

  5. An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether (An Interim Position Paper)

    EPA Science Inventory

    To determine the merit of a petition to remove ethylene glycol ether (EGBE) from the Agency's Hazardous Air Pollutant (HAP) list, EPA has developed an interim final position paper, called An Evaluation of the Human Carcinogenic Potential of Ethylene Glycol Butyl Ether, tha...

  6. Portland cement concrete pavement restoration : final summary report.

    DOT National Transportation Integrated Search

    1988-07-01

    This final summary report is comprised of an Initial Construction Report; a Final Report; and two Interim Reports. These reports document the construction of Louisiana's Portland Cement Concrete Pavement Restoration project and its performance during...

  7. 76 FR 37207 - Group Health Plans and Health Insurance Issuers: Rules Relating to Internal Claims and Appeals...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ...This document contains amendments to interim final regulations implementing the requirements regarding internal claims and appeals and external review processes for group health plans and health insurance coverage in the group and individual markets under provisions of the Affordable Care Act. These rules are intended to respond to feedback from a wide range of stakeholders on the interim final regulations and to assist plans and issuers in coming into full compliance with the law through an orderly and expeditious implementation process.

  8. 78 FR 12243 - Interim Final Determination To Stay and Defer Sanctions, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ...EPA is making an interim final determination to stay the imposition of offset sanctions and to defer the imposition of highway sanctions based on a proposed approval of a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River Air Quality Management District (FRAQMD) portion of the California State Implementation Plan (SIP) published elsewhere in this Federal Register. The SIP revision concerns two permitting rules submitted by the PCAPCD and FRAQMD, respectively: Rule 502, New Source Review, and Rule 10.1, New Source Review.

  9. Geographic patterns of at-risk species: A technical document supporting the USDA Forest Service Interim Update of the 2000 RPA Assessment

    Treesearch

    Curtis H. Flather; Michael S. Knowles; Jason McNees

    2008-01-01

    This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974. It updates past reports on the trends and geographic patterns of species formally listed as threatened or endangered under the Endangered Species Act of 1973. We...

  10. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  11. 75 FR 52597 - Availability of Interim Procedures for Federal External Review and Model Notices Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Availability of Interim Procedures for Federal External Review and Model Notices Relating to Internal Claims... procedures for the Federal external review process and model notices both for internal claims and appeals and... (3) A notice of final external review decision. Model language for the description of the internal...

  12. CBVE: A Study to Measure Its Effectiveness in Kentucky. Final Report. Interim Period 1.

    ERIC Educational Resources Information Center

    Vincent, Roger D.; Cobb, Robert A.

    An interim study was conducted in Kentucky to determine the effectiveness of Competency Based Vocational Education (CBVE) and to compare its effectiveness to that of traditional teaching methodologies. Research surveys of those directly involved in the implementation of CBVE were used to ascertain if CBVE is meeting its self-stated goals.…

  13. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  14. Results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Bannochie, C. J.

    2017-02-23

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR). Further work will report the results of the Extraction-Scrub-Strip (ESS) testing (Task 5 of the TTR) using the Tank 21H material. Task 4 of the TTR (MST Strike) will not be completed for Salt Batch 10.

  15. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  16. Procedures for the handling of retaliation complaints under section 1558 of the Affordable Care Act. Interim final rule; request for comments.

    PubMed

    2013-02-27

    This document provides the interim final regulations governing the employee protection (whistleblower) provision of section 1558 of the Affordable Care Act, which added section 18C of the Fair Labor Standards Act, to provide protections to employees of health insurance issuers or other employers who may have been subject to retaliation for reporting potential violations of the law's consumer protections (e.g., the prohibition on denials of insurance due to pre-existing conditions) or affordability assistance provisions (e.g., access to health insurance premium tax credits). This interim rule establishes procedures and time frames for the handling of retaliation complaints under section 18C, including procedures and time frames for employee complaints to the Occupational Safety and Health Administration (OSHA), investigations by OSHA, appeals of OSHA determinations to an administrative law judge (ALJ) for a hearing de novo, hearings by ALJs, review of ALJ decisions by the Administrative Review Board (ARB) (acting on behalf of the Secretary of Labor), and judicial review of the Secretary's final decision.

  17. Population and harvest trends of big game and small game species: a technical document supporting the USDA Forest Service Interim Update of the 2000 RPA Assessment

    Treesearch

    Curtis H. Flather; Michael S. Knowles; Stephen J. Brady

    2009-01-01

    This technical document supports the Forest Service's requirement to assess the status of renewable natural resources as mandated by the Forest and Rangeland Renewable Resources Planning Act of 1974 (RPA). It updates past reports on national and regional trends in population and harvest estimates for species classified as big game and small game. The trends...

  18. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  19. An Evaluation of the Individual Training Account/Eligible Training Provider Demonstration. Final Interim Report.

    ERIC Educational Resources Information Center

    D'Amico, Ronald; Martinez, Alexandria; Salzman, Jeffrey; Wagner, Robin

    In March 2000, thirteen grants were awarded as part of the Individual Training Account/Eligible Training Provider (ITA/ETP) Demonstration. In summer and fall of 2000, the grant recipients' activities were subjected to an interim evaluation. Site visits were made to each grantee to determine what ITA policies and practices were being formulated,…

  20. INTERIM METHOD FOR THE DETERMINATION OF ASBESTOS IN BULK INSULATION SAMPLES

    EPA Science Inventory

    The U.S. Environmental Protection Agency Asbestos-in-Schools Program was established in March, 1979 to provide information and technical assistance to the public for addressing problems presented by asbestos-containing insulation materials in school buildings. Because there were ...

  1. 75 FR 35672 - Changes in Flood Elevation Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ...This interim rule lists communities where modification of the Base (1% annual-chance) Flood Elevations (BFEs) is appropriate because of new scientific or technical data. New flood insurance premium rates will be calculated from the modified BFEs for new buildings and their contents.

  2. Institutional Effectiveness Summary Report, 2001.

    ERIC Educational Resources Information Center

    Burless, Bridget

    This document discusses institutional effectiveness at Florence-Darlington Technical College (FDTC) (South Carolina) for the 2000-2001 academic year. Full and/or interim report summaries are provided for advising procedures, library resources, and for the following departments: Accounting, Automated Office, Office Systems Technology, Health Care…

  3. 40 CFR 265.1059 - Standards: Delay of repair.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Section 265.1059 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... technically infeasible without a hazardous waste management unit shutdown. In such a case, repair of this...

  4. The DENALI Trial: an interim analysis of a prospective, multicenter study of the Denali retrievable inferior vena cava filter.

    PubMed

    Stavropoulos, S William; Sing, Ronald F; Elmasri, Fakhir; Silver, Mitchell J; Powell, Alex; Lynch, Frank C; Aal, Ahmed Kamel Abdel; Lansky, Alexandra J; Settlage, Richard A; Muhs, Bart E

    2014-10-01

    To assess safety and effectiveness of a nitinol retrievable inferior vena cava (IVC) filter in patients who require caval interruption to protect against pulmonary embolism (PE). Two hundred patients with temporary indications for an IVC filter were enrolled in this prospective, multicenter clinical study. Patients undergoing filter implantation were to be followed for 2 years or for 30 days after filter retrieval. At the time of the present interim report, all 200 patients had been enrolled in the study, and 160 had undergone a retrieval attempt or been followed to 6 months with their filter in place. Primary study endpoints included technical and clinical success of filter placement and retrieval. Patients were also evaluated for recurrent PE, new or worsening deep vein thrombosis, and filter migration, fracture, penetration, and tilt. Clinical success of placement was achieved in 94.5% of patients (172 of 182), with a one-sided lower limit of the 95% confidence interval of 90.1%. Technical success rate of filter placement was 99.5%. Technical success rate of retrieval was 97.3%; 108 filters were retrieved in 111 attempts. In two cases, the filter apex could not be engaged with a snare, and one device was engaged but could not be removed. Filter retrievals occurred at a mean indwell time of 165 days (range, 5-632 d). There were no instances of filter fracture, migration, or tilt greater than 15° at the time of retrieval or 6-month follow-up. In this interim report, the nitinol retrievable IVC filter provided protection against pulmonary embolism, and the device could be retrieved with a low rate of complications. Copyright © 2014 SIR. Published by Elsevier Inc. All rights reserved.

  5. Automobile or Other Conveyance and Adaptive Equipment Certificate of Eligibility for Veterans or Members of the Armed Forces With Amyotrophic Lateral Sclerosis Connected to Military Service. Final rule.

    PubMed

    2016-01-13

    The Department of Veterans Affairs (VA) published an Interim Final Rule on February 25, 2015, to amend its adjudication regulations to provide a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment for all veterans with service-connected amyotrophic lateral sclerosis (ALS) and servicemembers serving on active duty with ALS. The amendment authorized automatic issuance of a certificate of eligibility for financial assistance in the purchase of an automobile or other conveyance and adaptive equipment to all veterans with service-connected ALS and members of the Armed Forces serving on active duty with ALS. The intent of this final rule is to confirm the amendment made by the interim final rule without change.

  6. Technical support documentation for the Automated Residential Energy Standard (ARES) in support of proposed interim energy conservation voluntary performance standards for new non-federal residential buildings: Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Automated Residential Energy Standard (ARES) program is designed to identify levels of thermal integrity (e.g., insulation levels, glazing layers, equipment efficiencies, etc.) that are cost effective for typical residential structures and to create a residential energy standard based on these levels. This document contains technical background the explains the data and the algorithms used by the program.

  7. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 3A. GSFLS technical analysis (appendix). Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kriger, A.

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. The technical and financial considerations underlying a global spent fuel logistics systems have been studied and are reported. The Pacific Basin is used as a model throughout this report; however the stated methodology and, in many cases, considerations and conclusions are applicable to other global regions. Spent fuel discharge profiles for Pacific Basin Countries were used to determine the technical systems requirements for alternative concepts. Functional analyses and flows were generated to define both system design requirements and logistics parameters. Amore » technology review was made to ascertain the state-of-the-art of relevant GSFLS technical systems. Modular GSFLS facility designs were developed using the information generated from the functional analysis and technology review. The modular facility designs were used as a basis for siting and cost estimates for various GSFLS alternatives. Various GSFLS concepts were analyzed from a financial and economic perspective in order to provide total concepts costs and ascertain financial and economic sensitivities to key GSFLS variations. Results of the study include quantification of GSFLS facility and hardware requirements; drawings of relevant GSFLS facility designs; system cost estimates; financial reports - including user service charges; and comparative analyses of various GSFLS alternatives.« less

  8. High performance concrete in Washington state SR 18/SR 516 overcrossing : interim report on girder monitoring

    DOT National Transportation Integrated Search

    1999-04-30

    This report documents a sample of heavy-duty truck activity. This research effort was originated by the Planning and Technical Support Division of the California Air Resources Board (CARB) and jointly supported by the Federal Highway Administration (...

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.; Bannochie, C. J.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

  10. In-place cement stabilized base reconstruction techniques interim report, "construction and two year evaluation" : technical summary.

    DOT National Transportation Integrated Search

    2002-08-01

    The purpose of this research is to evaluate the effectiveness of soil cement shrinkage crack mitigation techniques. Ten test sections, 1000 feet long, were constructed on LA 89 in Vermilion Parish. The shrinkage crack mitigation methods being evaluat...

  11. Extension of the Presumptive Period for Compensation for Gulf War Veterans. Interim final rule.

    PubMed

    2016-10-17

    The Department of Veterans Affairs (VA) is issuing this interim final rule to amend its adjudication regulations regarding compensation for disabilities resulting from undiagnosed illnesses suffered by veterans who served in the Persian Gulf War. This amendment is necessary to extend the presumptive period for qualifying chronic disabilities resulting from undiagnosed illnesses that must become manifest to a compensable degree in order that entitlement for compensation be established. The intended effect of this amendment is to provide consistency in VA adjudication policy and preserve certain rights afforded to Persian Gulf War veterans and ensure fairness for current and future Persian Gulf War veterans.

  12. LINER FOR EXTRUSION BILLET CONTAINERS. Interim Technical Documentary Progress Report, June 5, 1962-September 5, 1962

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spachner, S.A.

    1962-10-31

    A container-sleeve-liner assembly was designed which will provide adequate support for ceramic, ceramic coated metal, or metal liners. The design minimizes mechanical property requirements of liner materials, and permits rapid removal of worn or damaged liners. A high-strength stem was designed and fabricated. Technical literature on high-strength materials was reviewed, and high-strength materials producers were contacted to locate sources and assess applicability of existing materials for refractory metal extrusion liner use. (auth)

  13. Review of APR+ Level 2 PSA. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lehner, John R.; Mubayi, Vinod; Pratt, W. Trevor

    2012-02-17

    Brookhaven National Laboratory (BNL) assisted the Korea Institute of Nuclear Safety (KINS) in reviewing the Level 2 Probabilistic Safety Assessment (PSA) of the APR+ Advanced Pressurized Water Reactor (PWR) prepared by the Korea Hydro & Nuclear Power Co., Ltd (KHNP) and KEPCO Engineering & Construction Co., Inc. (KEPCO-E&C). The work described in this report involves a review of the APR+ Level 2 PSA submittal [Ref. 1]. The PSA and, therefore, the review is limited to consideration of accidents initiated by internal events. As part of the review process, the review team also developed three sets of Requests for Additional Informationmore » (RAIs). These RAIs were provided to KHNP and KEPCO-E&C for their evaluation and response. This final detailed report documents the review findings for each technical element of the PSA and includes consideration of all of the RAIs made by the reviewers as well as the associated responses. This final report was preceded by an interim report [Ref. 2] that focused on identifying important issues regarding the PSA. In addition, a final meeting on the project was held at BNL on November 21-22, 2011, where BNL and KINS reviewers discussed their preliminary review findings with KHNP and KEPCO-E&C staffs. Additional information obtained during this final meeting was also used to inform the review findings of this final report. The review focused not only on the robustness of the APR+ design to withstand severe accidents, but also on the capability and acceptability of the Level 2 PSA in terms of level of detail and completeness. The Korean nuclear regulatory authorities will decide whether the PSA is acceptable and the BNL review team is providing its comments for KINS consideration. Section 2.0 provides the basis for the BNL review. Section 3.0 presents the review of each technical element of the PSA. Conclusions and a summary are presented in Section 4.0. Section 5.0 contains the references.« less

  14. Prizes for innovation of new medicines and vaccines.

    PubMed

    Love, James; Hubbard, Tim

    2009-01-01

    This article argues that prizes can help stimulate medical innovation, control costs and ensure greater access to new medicines and vaccines. The authors explore four increasingly ambitious prize options to reward medical innovation, each addressing flaws in the current patent system. The first option promotes innovation through a large prize fund linked to the impact on health outcomes; the second option rewards the sharing of knowledge, data, and technology with open source dividends; the third option awards prizes for interim benchmarks and discrete technical problems; and the final option removes the exclusive right to use patented inventions in upstream research in favor of prizes. The authors conclude that a system of prizes to reward drug development would break the link between R&D incentives and product prices, and that such a reform is needed to improve innovation and access to new medicines and vaccines.

  15. 78 FR 13478 - Compassionate Release; Technical Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... (Bureau) makes a minor change to remove an administrative level of review from the processing of a... interim rule, the Bureau of Prisons (Bureau) makes a minor change to remove an administrative level of review from the processing of a Compassionate Release request packet. DATES: This rule is effective April...

  16. Coverage of Certain Preventive Services Under the Affordable Care Act. Final rules.

    PubMed

    2015-07-14

    This document contains final regulations regarding coverage of certain preventive services under section 2713 of the Public Health Service Act (PHS Act), added by the Patient Protection and Affordable Care Act, as amended, and incorporated into the Employee Retirement Income Security Act of 1974 and the Internal Revenue Code. Section 2713 of the PHS Act requires coverage without cost sharing of certain preventive health services by non-grandfathered group health plans and health insurance coverage. These regulations finalize provisions from three rulemaking actions: Interim final regulations issued in July 2010 related to coverage of preventive services, interim final regulations issued in August 2014 related to the process an eligible organization uses to provide notice of its religious objection to the coverage of contraceptive services, and proposed regulations issued in August 2014 related to the definition of "eligible organization,'' which would expand the set of entities that may avail themselves of an accommodation with respect to the coverage of contraceptive services.

  17. Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the Long-Term Care Hospital Prospective Payment System and Policy Changes and Fiscal Year 2017 Rates; Quality Reporting Requirements for Specific Providers; Graduate Medical Education; Hospital Notification Procedures Applicable to Beneficiaries Receiving Observation Services; Technical Changes Relating to Costs to Organizations and Medicare Cost Reports; Finalization of Interim Final Rules With Comment Period on LTCH PPS Payments for Severe Wounds, Modifications of Limitations on Redesignation by the Medicare Geographic Classification Review Board, and Extensions of Payments to MDHs and Low-Volume Hospitals. Final rule.

    PubMed

    2016-08-22

    We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital-related costs of acute care hospitals to implement changes arising from our continuing experience with these systems for FY 2017. Some of these changes will implement certain statutory provisions contained in the Pathway for Sustainable Growth Reform Act of 2013, the Improving Medicare Post-Acute Care Transformation Act of 2014, the Notice of Observation Treatment and Implications for Care Eligibility Act of 2015, and other legislation. We also are providing the estimated market basket update to apply to the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits for FY 2017. We are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) for FY 2017. In addition, we are making changes relating to direct graduate medical education (GME) and indirect medical education payments; establishing new requirements or revising existing requirements for quality reporting by specific Medicare providers (acute care hospitals, PPS-exempt cancer hospitals, LTCHs, and inpatient psychiatric facilities), including related provisions for eligible hospitals and critical access hospitals (CAHs) participating in the Electronic Health Record Incentive Program; updating policies relating to the Hospital Value-Based Purchasing Program, the Hospital Readmissions Reduction Program, and the Hospital-Acquired Condition Reduction Program; implementing statutory provisions that require hospitals and CAHs to furnish notification to Medicare beneficiaries, including Medicare Advantage enrollees, when the beneficiaries receive outpatient observation services for more than 24 hours; announcing the implementation of the Frontier Community Health Integration Project Demonstration; and making technical corrections and changes to regulations relating to costs to related organizations and Medicare cost reports; we are providing notice of the closure of three teaching hospitals and the opportunity to apply for available GME resident slots under section 5506 of the Affordable Care Act. We are finalizing the provisions of interim final rules with comment period that relate to a temporary exception for certain wound care discharges from the application of the site neutral payment rate under the LTCH PPS for certain LTCHs; application of two judicial decisions relating to modifications of limitations on redesignation by the Medicare Geographic Classification Review Board; and legislative extensions of the Medicare-dependent, small rural hospital program and changes to the payment adjustment for low-volume hospitals.

  18. Abradable compressor and turbine seals, volume 1. [for turbofan engines

    NASA Technical Reports Server (NTRS)

    Sundberg, D. V.; Dennis, R. E.; Hurst, L. G.

    1979-01-01

    The application and advantages of abradable coatings as gas-path seals in a general aviation turbine engine were evaluated for use on the high-pressure compressor, the high-pressure turbine, and the low-pressure turbine shrouds. Topics covered include: (1) the initial selection of candidate materials for interim full-scale engine testing; (2) interim engine testing of the initially selected materials and additional candidate materials; (3) the design of the component required to adapt the hardware to permit full-scale engine testing of the most promising materials; (4) finalization of the fabrication methods used in the manufacture of engine test hardware; and (5) the manufacture of the hardware necessary to support the final full-scale engine tests.

  19. Medicare program; revisions to FY 2009 Medicare severity-long-term care diagnosis-related group (MS-LTC-DRG) weights. Interim final rule with comment period.

    PubMed

    2009-06-03

    This interim final rule with comment period implements revised Medicare severity long-term care diagnosis-related group (MS-LTC-DRG) relative weights for payment under the long-term care hospital (LTCH) prospective payment system (PPS) for federal fiscal year (FY) 2009. We are revising the MS-LTC-DRG relative weights for FY 2009 due to the misapplication of our established methodology in the calculation of the budget neutrality factor. The revised FY 2009 MS-LTC-DRG relative weights are effective for the remainder of FY 2009 (that is, from June 3, 2009 through September 30, 2009).

  20. Disclosure of information to organ, tissue and eye procurement organizations. Final rule.

    PubMed

    2008-11-03

    This document adopts, with changes, a Department of Veterans Affairs (VA) interim final rule that implemented provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006 concerning disclosure of information to organ, tissue and eye procurement organizations. The regulation will provide authority for VA to provide individually-identifiable VA medical records of veterans or dependents of veterans who are deceased or whose death is imminent to representatives of organ procurement organizations, eye banks, and tissue banks to determine whether the patients are suitable potential donors. This document modifies the interim final rule to clarify the definition of "near death" and to correct a grammatical error in the definition of "procurement organization." This document also clarifies that eye bank and tissue bank registration with FDA must have an active status.

  1. 77 FR 4654 - Senior Community Service Employment Program; Final Rule, Additional Indicator on Volunteer Work

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... rule amends our regulations regarding Performance Accountability for title V of the Older Americans Act... on September 1, 2010. 75 FR 53786. Previously, an interim final rule (IFR) on performance measures... performance through regulation. OAA Sec. 513(b)(3). As established in the SCSEP Final Rule published September...

  2. 76 FR 63151 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-12

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 120 RIN 3245-AG17 Small Business Jobs Act: 504 Loan Program Debt Refinancing AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: This rule finalizes the interim final rule that implemented section 1122 of the Small Business Jobs Act of...

  3. 77 FR 2446 - Amendments to Regulations Regarding Eligibility for a Medicare Prescription Drug Subsidy

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Administration. ACTION: Final rule. SUMMARY: This final rule adopts, without change, the interim final rule with... incorporated changes to the Medicare prescription drug coverage low-income subsidy (Extra Help) program made by..., 2011. We also revised our regulations to incorporate changes made by the Medicare Improvements for...

  4. 76 FR 446 - Supplemental Security Income (SSI) for the Aged, Blind, and Disabled; Dedicated Accounts and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 [Docket No. SSA-2008-0050] RIN 0960-AE59... Payments for Certain Past- Due SSI Benefits AGENCY: Social Security Administration (SSA). ACTION: Final rules. SUMMARY: These final rules adopt, with some minor changes, the interim final rules with request...

  5. Cathodic Protection Field Trials on Prestressed Concrete Components, Final Report

    DOT National Transportation Integrated Search

    1998-01-01

    This is the final report in a study to demonstrate the feasibility of using cathodic protection (CP) on concrete bridge structures containing prestressed steel. The interim report, FHWA-RD-95-032, has more details on the installation of selected CP s...

  6. 40 CFR 57.813 - Final decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Final decision. 57.813 Section 57.813 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) PRIMARY NONFERROUS SMELTER ORDERS Waiver of Interim Requirement for Use of Continuous Emission Reduction Technology...

  7. Visions for Natural Resource Education and Ecosystem Science for the 21st Century. An Interim Report.

    ERIC Educational Resources Information Center

    Cudmore, Wynn, Ed.; Kelly, Susie, Ed.

    The Northwest Center for Sustainable Resources (NCSR) is a partnership of educators and numerous agencies dealing with natural resource management. NCSR emphasizes the ecosystem as a central theme in natural resource technical education. This booklet explains NCSR's relationship to secondary and higher education, describes NCSR programs and…

  8. FOD Prevention at NASA-Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Lowrey, Nikki M.

    2011-01-01

    NASA now requires all flight hardware projects to develop and implement a Foreign Object Damage (FOD) Prevention Program. With the increasing use of composite and bonded structures, NASA now also requires an Impact Damage Protection Plan for these items. In 2009, Marshall Space Flight Center released an interim directive that required all Center organizations to comply with FOD protocols established by on-site Projects, to include prevention of impact damage. The MSFC Technical Standards Control Board authorized the development of a new MSFC technical standard for FOD Prevention.

  9. Superfund record of decision (EPA Region 4): T. H. Agriculture and Nutrition Site, operable unit 1, Montgomery, AL, April 17, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.

  10. 76 FR 70227 - Medicare Program; End-Stage Renal Disease Prospective Payment System and Quality Incentive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ...This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  11. 75 FR 60261 - Federal Acquisition Regulation; Award-Fee Language Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ...-AL42 Federal Acquisition Regulation; Award-Fee Language Revision AGENCIES: Department of Defense (DoD...: Final rule. SUMMARY: The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) have adopted as final, with changes, the interim rule amending the Federal Acquisition...

  12. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    PubMed

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  13. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  14. 78 FR 49967 - Magnuson-Stevens Fishery Conservation and Management Act Provisions; Fisheries of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ...: Final rule. SUMMARY: This final rule reopens an additional portion of the Georges Bank Closed Area to... interim final rule reopened a portion of the Georges Bank Closed Area that had been closed to the harvest... additional portion of the Georges Bank Closed Area. DATES: This rule is effective August 16, 2013. ADDRESSES...

  15. The small-scale treatability study sample exemption

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Coalgate, J.

    1991-01-01

    In 1981, the Environmental Protection Agency (EPA) issued an interim final rule that conditionally exempted waste samples collected solely for the purpose of monitoring or testing to determine their characteristics or composition'' from RCRA Subtitle C hazardous waste regulations. This exemption (40 CFR 261.4(d)) apples to the transportation of samples between the generator and testing laboratory, temporary storage of samples at the laboratory prior to and following testing, and storage at a laboratory for specific purposes such as an enforcement action. However, the exclusion did not include large-scale samples used in treatability studies or other testing at pilot plants ormore » other experimental facilities. As a result of comments received by the EPA subsequent to the issuance of the interim final rule, the EPA reopened the comment period on the interim final rule on September 18, 1987, and specifically requested comments on whether or not the sample exclusion should be expanded to include waste samples used in small-scale treatability studies. Almost all responders commented favorably on such a proposal. As a result, the EPA issued a final rule (53 FR 27290, July 19, 1988) conditionally exempting waste samples used in small-scale treatability studies from full regulation under Subtitle C of RCRA. The question of whether or not to extend the exclusion to larger scale as proposed by the Hazardous Waste Treatment Council was deferred until a later date. This information Brief summarizes the requirements of the small-scale treatability exemption.« less

  16. 76 FR 1603 - Agency Information Collection Activities: Proposed Collection, Comment Request: Reporting of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ...The Commodity Futures Trading Commission (``Commission'' or ``CFTC'') is announcing an opportunity for public comment on the proposed collection of certain information by the agency. Under the Paperwork Reduction Act (``PRA''), 44 U.S.C. 3501 et seq., Federal agencies are required to publish notice in the Federal Register concerning each proposed collection of information and to allow 60 days for public comment. The Commission recently adopted an interim final rule, as required by the Wall Street Reform and Consumer Protection Act (``Dodd-Frank Act''), requiring counterparties to a pre-enactment unexpired swap to report such swaps according to such rules as the Commission may in the future adopt. This notice solicits comments on the record retention requirement that is embedded in the interim final rule's reporting requirement, which was recognized by the Commission in an interpretive note to the final rule.

  17. Petition to request an exemption from 100 percent identity testing of dietary ingredients: Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements. Interim final rule.

    PubMed

    2007-06-25

    The Food and Drug Administration (FDA) is issuing an interim final rule (IFR) that sets forth a procedure for requesting an exemption from the requirement in the final rule "Current Good Manufacturing Practice in Manufacturing, Packaging, Labeling, or Holding Operations for Dietary Supplements," published elsewhere in this issue of the Federal Register, that the manufacturer conduct at least one appropriate test or examination to verify the identity of any component that is a dietary ingredient. This IFR allows for submission to, and review by, FDA of an alternative to the required 100 percent identity testing of components that are dietary ingredients, provided certain conditions are met and establishes a requirement for retention of records relating to the FDA's response to an exemption request.

  18. Comparative risk assessments for the production and interim storage of glass and ceramic waste forms: Defense waste processing facility

    NASA Astrophysics Data System (ADS)

    Huang, J. C.; Wright, W. V.

    1982-04-01

    The Defense Waste Processing Facility (DWPF) for immobilizing nuclear high level waste (HLW) is scheduled to be built. High level waste is produced when reactor components are subjected to chemical separation operations. Two candidates for immobilizing this HLW are borosilicate glass and crystalline ceramic, either being contained in weld sealed stainless steel canisters. A number of technical analyses are being conducted to support a selection between these two waste forms. The risks associated with the manufacture and interim storage of these two forms in the DWPF are compared. Process information used in the risk analysis was taken primarily from a DWPF processibility analysis. The DWPF environmental analysis provided much of the necessary environmental information.

  19. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.

  20. Payment or Reimbursement for Certain Medical Expenses for Camp Lejeune Family Members. Final rule.

    PubMed

    2017-05-05

    The Department of Veterans Affairs (VA) adopts as final an interim final rule addressing payment or reimbursement of certain medical expenses for family members of Camp Lejeune veterans. Under this rule, VA reimburses family members, or pays providers, for medical expenses incurred as a result of certain illnesses and conditions that may be associated with contaminants present in the base water supply at U.S. Marine Corps Base Camp Lejeune (Camp Lejeune), North Carolina, from August 1, 1953, to December 31, 1987. Payment or reimbursement is made within the limitations set forth in statute and Camp Lejeune family members receive hospital care and medical services that are consistent with the manner in which we provide hospital care and medical services to Camp Lejeune veterans. The statutory authority has since been amended to also include certain veterans' family members who resided at Camp Lejeune, North Carolina, for no less than 30 days (consecutive or nonconsecutive) between August 1, 1953, and December 31, 1987. This final rule will reflect that statutory change and will address public comments received in response to the interim final rule.

  1. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  2. Nondiscrimination on the basis of handicap--Office of the Secretary, HHS. Interim final rule.

    PubMed

    1983-03-07

    The interim final rule modifies existing regulations to meet the exigent needs that can arise when a handicapped infant is discriminatorily denied food or other medical care. Three current regulatory provisions are modified to allow timely reporting of violations, expeditious investigation, and immediate enforcement action when necessary to protect a handicapped infant whose life is endangered by discrimination in a program or activity receiving federal financial assistance. Recipients that provide health care to infants will be required to post a conspicuous notice in locations that provide such care. The notice will describe the protections under federal law against discrimination toward the handicapped, and will provide a contact point in the Department of HHS for reporting violations immediately by telephone.

  3. 78 FR 79567 - Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF AGRICULTURE Food and Nutrition Service 7 CFR Parts 271 and 274 RIN 0584-AE26 Supplemental Nutrition Assistance Program: Trafficking Controls and Fraud Investigations AGENCY: Food and Nutrition Service, USDA. ACTION: Final rule, Interim final rule; notice of approval of Information...

  4. 77 FR 40459 - Electronic Fund Transfers (Regulation E); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Electronic Fund Transfers (Regulation E); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION... published the Final Rule (77 FR 6194), which implements the Electronic Fund Transfer Act, and the official... Sec. 1005.3(a) in the interim final rule, Electronic Fund Transfers (Regulation E), published on...

  5. Superfund record of decision (EPA Region 6): Longhorn Army Ammunition Plant, IHAAP 12 and 16 Landfills, Karnack, TX, September 27, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-03-01

    This decision document presents the selected Early Interim Remedial Action for the LHAAP 12 and 16 landfills, Longhorn Army Ammunition Plant (LHAAP), Karnack, Texas. The Record of Decision for the sites addresses an Early Interim Remedial Action. The selected remedy consists of a multilayer landfill cap section which includes the following components: Foundation soil layer, Sodium Bentonite Geocomposite Liner, Geosynthetic Membrane Liner, Final soil cover, and Perimeter berms and drainage swales.

  6. A SUGGESTED CURRICULUM GUIDE FOR ELECTRO-MECHANICAL TECHNOLOGY ORIENTED SPECIFICALLY TO THE COMPUTER AND BUSINESS MACHINE FIELDS. INTERIM REPORT.

    ERIC Educational Resources Information Center

    LESCARBEAU, ROLAND F.; AND OTHERS

    A SUGGESTED POST-SECONDARY CURRICULUM GUIDE FOR ELECTRO-MECHANICAL TECHNOLOGY ORIENTED SPECIFICALLY TO THE COMPUTER AND BUSINESS MACHINE FIELDS WAS DEVELOPED BY A GROUP OF COOPERATING INSTITUTIONS, NOW INCORPORATED AS TECHNICAL EDUCATION CONSORTIUM, INCORPORATED. SPECIFIC NEEDS OF THE COMPUTER AND BUSINESS MACHINE INDUSTRY WERE DETERMINED FROM…

  7. A Comparison of Learning Environments: All That Glitters... Interim Technical Paper for Period January 1990-July 1991.

    ERIC Educational Resources Information Center

    Shute, Valerie J.

    Aptitude-treatment interactions (ATIs) refer to the covariation between learner characteristic and instructional treatment in relation to some outcome measure. To systematically test for ATI, an intelligent tutoring system instructing in basic principles of electricity was chosen as a complex but controlled learning task. Two learning environments…

  8. Polyphosphazene Solid Electrolytes.

    DTIC Science & Technology

    1984-10-01

    soL..I’IIN ’ . LAV A - .:.u.s 009 ’-" 4. T .. T. edSutoe .TVCO EO T EI O Polyphosphazene Solid Electrolytes Interim Technical Repor 6. PEAFORMING RG ...Y. T.; Whitmore , D. H. Solid State Ionics 1982, 7, 129. (10) Bauerle, J. E. J. Phys. Chem. Solids 1969, 30, 2657. (11) MacDonald, J. R. J. Chem. Phys

  9. A Guide for Planning Facilities for Occupational Preparation Programs in Metallurgy Technology. Interim Report. Research 28.

    ERIC Educational Resources Information Center

    German, Carl, Jr.

    The major purpose of this guide is to elicit the information necessary for writing educational specifications for facilities to house technical education programs in metallurgy. It is organized in these parts: (1) Part I discusses the major purpose, underlying assumptions, recent instructional trends, and guiding principles utilized in the…

  10. Human-Machine Teams: The Social Frontier

    DTIC Science & Technology

    2015-12-01

    Trust & Interaction Branch December 2015 Interim Report Distribution A. Approved for public release AIR FORCE RESEARCH LABORATORY 711TH HUMAN...711th Human Performance Wing Air Force Research Laboratory This report is published in the interest of scientific and technical information exchange... Research Laboratory 711th Human Performance Wing Human Effectiveness Directorate Human Centered ISR Division Human Trust & Interaction Branch Wright

  11. Investigation of Electronic Generation of Visual Images for Air Force Technical Training. Interim Report for Period May 1974-October 1975.

    ERIC Educational Resources Information Center

    Filinger, Ronald H.; Hall, Paul W.

    Because large scale individualized learning systems place excessive demands on conventional means of producing audiovisual software, electronic image generation has been investigated as an alternative. A prototype, experimental device, Scanimate-500, was designed and built by the Computer Image Corporation. It uses photographic, television, and…

  12. Accidental Government Documents Librarian: A Review of Experiences and Training Needs of Interim Documents Librarians

    ERIC Educational Resources Information Center

    Yelinek, Kathryn; Hinchcliff, Marilou

    2009-01-01

    The results of a survey to determine the training needs and normative experiences of temporary government documents librarians are presented. The results indicate that temporary librarians tend to work in academia, have been in librarianship for a shorter time period, and have fewer technical processing skills than permanent documents librarians.…

  13. Taxonomy of Learning Skills. Interim Technical Report for the Period February 1986-1987.

    ERIC Educational Resources Information Center

    Kyllonen, Patrick C.; Shute, Valerie J.

    Questions concerning individual differences in learning ability may be more precisely addressed in light of an agreed-upon taxonomy of learning skills. Existing taxonomies are reviewed, and their shortcomings are described. A taxonomy is then proposed based on a synthesis of current thought consisting of four dimensions: the forms of knowledge;…

  14. THE WIDE-AREA ENERGY STORAGE AND MANAGEMENT SYSTEM PHASE II Final Report - Flywheel Field Tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    This research was conducted by Pacific Northwest National Laboratory (PNNL) operated for the U.S. department of Energy (DOE) by Battelle Memorial Institute for Bonneville Power Administration (BPA), California Institute for Energy and Environment (CIEE) and California Energy Commission (CEC). A wide-area energy management system (WAEMS) is a centralized control system that operates energy storage devices (ESDs) located in different places to provide energy and ancillary services that can be shared among balancing authorities (BAs). The goal of this research is to conduct flywheel field tests, investigate the technical characteristics and economics of combined hydro-flywheel regulation services that can be sharedmore » between Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) controlled areas. This report is the second interim technical report for Phase II of the WAEMS project. This report presents: 1) the methodology of sharing regulation service between balancing authorities, 2) the algorithm to allocate the regulation signal between the flywheel and hydro power plant to minimize the wear-and-tear of the hydro power plants, 3) field results of the hydro-flywheel regulation service (conducted by the Beacon Power), and 4) the performance metrics and economic analysis of the combined hydro-flywheel regulation service.« less

  15. 77 FR 31513 - Patient Protection and Affordable Care Act; Establishment of Exchanges and Qualified Health Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... the final rule, interim final rule, published in the Federal Register on March 27, 2012, entitled...)(2) of the final rule that at least two types of entities must serve as Navigators.'' On page 18336... of personally identifiable information in Sec. 155.260(a) of the proposed rule published on July 15...

  16. Patient Protection and Affordable Care Act; program integrity: exchange, premium stabilization programs, and market standards; amendments to the HHS notice of benefit and payment parameters for 2014. Final rule.

    PubMed

    2013-10-30

    This final rule implements provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively referred to as the Affordable Care Act). Specifically, this final rule outlines financial integrity and oversight standards with respect to Affordable Insurance Exchanges, qualified health plan (QHP) issuers in Federally-facilitated Exchanges (FFEs), and States with regard to the operation of risk adjustment and reinsurance programs. It also establishes additional standards for special enrollment periods, survey vendors that may conduct enrollee satisfaction surveys on behalf of QHP issuers, and issuer participation in an FFE, and makes certain amendments to definitions and standards related to the market reform rules. These standards, which include financial integrity provisions and protections against fraud and abuse, are consistent with Title I of the Affordable Care Act. This final rule also amends and adopts as final interim provisions set forth in the Amendments to the HHS Notice of Benefit and Payment Parameters for 2014 interim final rule, published in the Federal Register on March 11, 2013, related to risk corridors and cost-sharing reduction reconciliation.

  17. PRN 95-3: Reduction of Worker protection Standard (WPS) Interim Restricted Entry Intervals (REIS) for Certain Low Risk Pesticides

    EPA Pesticide Factsheets

    On January 11, 1995, EPA published a draft policy on Reduced Restricted Entry Intervals for Certain Pesticides, in the Federal Register. The final policy was published in the Federal Register on May 3, 1995. This Notice contains the final policy.

  18. 76 FR 16531 - Country of Origin of Textile and Apparel Products; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-24

    ... RIN 1505-AB60) Country of Origin of Textile and Apparel Products; Correction AGENCIES: U.S. Customs and Border Protection, Department of Homeland Security; Department of the Treasury. ACTION: Final rule..., a document which adopted as a final rule, with some changes, interim amendments to the CBP...

  19. 76 FR 38552 - Amendments to Regulations Regarding Major Life-Changing Events Affecting Income-Related Monthly...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-01

    ... to Regulations Regarding Major Life-Changing Events Affecting Income-Related Monthly Adjustment.... SUMMARY: This final rule adopts, without change, the interim final rule with request for comments we... consider major life-changing events for the Medicare Part B income- related monthly adjustment amount...

  20. 75 FR 39443 - Implementation of OMB Guidance on Drug-Free Workplace Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... (DOE) is removing its regulation implementing the Governmentwide common rule on drug-free workplace... drug legislation on November 18, 1988. Federal agencies issued an interim final common rule to... Governmentwide common rule on nonprocurement suspension and debarment. The agencies issued a final common rule...

  1. 76 FR 76046 - Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... Valley Unified Air Pollution Control District (SJVUAPCD or District) portion of the California State...), we finalized a limited approval and limited disapproval of San Joaquin Valley Unified Air Pollution...

  2. Top 10 research priorities relating to stroke nursing: a rigorous approach to establish a national nurse-led research agenda.

    PubMed

    Rowat, Anne; Pollock, Alex; St George, Bridget; Cowey, Eileen; Booth, Joanne; Lawrence, Maggie

    2016-11-01

    To determine the top 10 research priorities specific to stroke nursing. It is important that stroke nurses build their research capability and capacity. This project built on a previous James Lind Alliance prioritization project, which established the shared stroke research priorities of stroke survivors, carers and health professionals. Research priority setting project using James Lind Alliance methods; a survey for interim prioritization and a consensus meeting for final priority setting. Between September - November 2014, stroke nurses were invited to select their top 10 priorities from a previously established list of 226 unique unanswered questions. These data were used to generate a list of shared research priorities (interim priority setting stage). A purposefully selected group of stroke nurses attended a final consensus meeting (April 2015) to determine the top 10 research priorities. During the interim prioritization stage, 97 stroke nurses identified 28 shared priority treatment uncertainties. At the final consensus meeting, 27 stroke nurses reached agreement on the top 10 stroke nursing research priorities. Five of the top 10 questions relate to stroke-specific impairments and five relate to rehabilitation and long-term consequences of stroke. The research agenda for stroke nursing has now been clearly defined, facilitating nurses to undertake research, which is of importance to stroke survivors and carers and central to supporting optimal recovery and quality of life after stroke. © 2016 John Wiley & Sons Ltd.

  3. Skylab program earth resources experiment package sensor performance evaluation, volume 1, (S190A)

    NASA Technical Reports Server (NTRS)

    Kenney, G. P.

    1975-01-01

    The results of S190A sensor performance evaluation are summarized based on data presented by all contributors to the sensor performance evaluation interim reports. Techniques used in sensor performance evaluation are discussed. Topics discussed include: performance degradation identified during the Skylab missions, S190A and EREP system anomalies that affected S190A performance, and the performance achieved, in terms of pertinent S190A parameters. Additional analyses include final performance analyses completed after submittal of the SL4 interim sensor performance evaluation reports, including completion of detailed analyses of basic performance parameters initiated during the interim report periods and consolidation analyses to reduce independent mission data (SL2, SL3, and SL4) to determine overall performance realized during all three Skylab missions.

  4. [The history of the Kaiser Wilhelm Society during the Third Reich. Interim reports of the president's commission of the Max Planck Society].

    PubMed

    Weber, M M

    2002-11-01

    In 1997 the Max Planck Society set up a presidential commission to do research on the historical development of its precursor organization, the Kaiser Wilhelm Society (KWG), during the Third Reich. This paper presents some of the important results given in the interim reports of this commission that are relevant to psychiatry. It focuses on brain research, anthropology, psychiatric genetics, and the role of the well-known biochemist Adolf Butenandt. In general, the interim reports reflect the numerous links between the biomedical research of the KWG and the institutions of the National Socialist (Nazi) state. However, they do not yet allow a final historical assessment as to the complex situation of this field of research during National Socialism.

  5. 76 FR 17331 - Debt Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... procedures for collection of debts through salary offset, administrative offset, tax refund offset, and... procedure and is interpretative in nature. The procedures contained in the interim final rule for salary...

  6. Regulatory Supervision of Radiological Protection in the Russian Federation as Applied to Facility Decommissioning and Site Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sneve, M.K.; Shandala, N.K.

    2007-07-01

    The Russian Federation is carrying out major work to manage the legacy of exploitation of nuclear power and use of radioactive materials. This paper describes work on-going to provide enhanced regulatory supervision of these activities as regards radiological protection. The scope includes worker and public protection in routine operation; emergency preparedness and response; radioactive waste management, including treatment, interim storage and transport as well as final disposal; and long term site restoration. Examples examined include waste from facilities in NW Russia, including remediation of previous shore technical bases (STBs) for submarines, spent fuel and radioactive waste management from ice-breakers, andmore » decommissioning of Radio-Thermal-Generators (RTGs) used in navigational devices. Consideration is given to the identification of regulatory responsibilities among different regulators; development of necessary regulatory instruments; and development of regulatory procedures for safety case reviews and compliance monitoring and international cooperation between different regulators. (authors)« less

  7. Global Spent Fuel Logistics Systems Study (GSFLS). Volume 2. GSFLS visit findings and evaluations. Interim report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1978-01-31

    This report is a part of the interim report documentation for the Global Spent Fuel Logistics System (GSFLS) study. This report describes a global framework that evaluates spent fuel disposition requirements, influencing factors and strategies. A broad sampling of foreign governmental officials, electric utility spokesmen and nuclear power industry officials responsible for GSFLS policies, plans and programs were surveyed as to their views with respect to national and international GSFLS related considerations. The results of these GSFLS visit findings are presented herein. These findings were then evaluated in terms of technical, institutional and legal/regulatory implications. The GSFLS evaluations, in conjunctionmore » with perceived US spent fuel objectives, formed the basis for selecting a set of GSFLS strategies which are reported herein.« less

  8. Multifunctional Nanotechnology Research

    DTIC Science & Technology

    2016-03-01

    MULTIFUNCTIONAL NANOTECHNOLOGY RESEARCH MARCH 2016 INTERIM TECHNICAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED STINFO COPY AIR...REPORT 3. DATES COVERED (From - To) JAN 2015 – JAN 2016 4. TITLE AND SUBTITLE MULTIFUNCTIONAL NANOTECHNOLOGY RESEARCH 5a. CONTRACT NUMBER IN-HOUSE...H. Yoon, and C. S. Hwang, “Electrically configurable electroforming and bipolar resistive switching in Pt/TiO2/Pt structures.,” Nanotechnology , vol

  9. A Real-Time Systems Symposium Preprint.

    DTIC Science & Technology

    1983-09-01

    Real - Time Systems Symposium Preprint Interim Tech...estimate of the occurence of the error. Unclassii ledSECUqITY CLASSIF’ICA T" NO MI*IA If’ inDI /’rrd erter for~~ble. ’Corrputnqg A REAL - TIME SYSTEMS SYMPOSIUM...ABSTRACT This technical report contains a preprint of a paper accepted for presentation at the REAL - TIME SYSTEMS SYMPOSIUM, Arlington,

  10. Technical Operations (TOPS) IV Task Order 0003: Responsive Interface for Transport Tuning (RITT)

    DTIC Science & Technology

    2016-05-29

    on the further development of artificial hair sensors (AHS) featuring a responsive carbon nanotube (CNT) array to serve as a piezoresistive element...under separate cover, as AFRL Interim Report AFRL-RX-WP-TR-2016-0071 dated 30 October 2015. 15. SUBJECT TERMS artificial hair sensor, carbon... Hair Sensors: Fabrication and Model Parameterization .......................... 4 3.1.1 Introduction

  11. Examination of Multi-Core Architectures

    DTIC Science & Technology

    2010-11-01

    NOVEMBER 2010 2. REPORT TYPE Interim Technical Report 3. DATES COVERED (From - To) February 2010 – July 2010 4 . TITLE AND SUBTITLE EXAMINATION OF...STATEMENT 1 2.0 BACKGROUND 1 3.0 ARCHITECTURE CHARACTERISTICS 3 3.1 NVIDIA Tesla 3 3.2 TILE64 4 ...1 Tesla Architecture 3 2 TILE64 Architecture 4 3 Single Tile Architecture 4 4 STI Cell Broadband Engine

  12. General Cognitive Ability Predicts Job Performance. Interim Technical Paper for Period November 1990 - November 1991.

    ERIC Educational Resources Information Center

    Ree, Malcolm James; And Others

    A study investigated the roles of general ability and specific abilities as predictors of several job performance criteria for Air Force enlistees in eight jobs. Subjects were 1,545 Air Force enlistees entering from 1984 through 1988 who had tested with the Armed Services Vocational Aptitude Battery (ASVAB) parallel forms 11, 12, or 13. Subjects…

  13. 78 FR 46781 - Federal Acquisition Regulation; Definition of Contingency Operation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ... in 48 CFR Part 2 Government procurement. Dated: July 26, 2013. William Clark, Acting Director, Office...: Final rule. SUMMARY: DoD, GSA, and NASA have adopted as final, without change, an interim rule amending... address the statutory change to the definition made by the National Defense Authorization Act for Fiscal...

  14. 76 FR 44761 - Remittance Transfers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ...) (interim final rule); 72 FR 7927 (Feb. 22, 2007) (final rule). Section 1073 of the Dodd-Frank Act added a new Section 919 to the EFTA, entitled ``Remittance Transfers.'' Public Law 111-203, Sec. 1073, 124.... 1693o-1. Paragraph (d) of Section 1073 of Dodd-Frank amended the FCU Act to specify that a remittance...

  15. Educational Information System for Ontario. Final Report, March 1977-April 1978.

    ERIC Educational Resources Information Center

    Auster, Ethel; Lawton, Stephen B.

    This final report describing the operation and research of the EISO project, which provides online bibliographic search services to educators of Ontario, briefly summarizes the first and second interim reports. In addition, it discusses users and the uses of EISO information by providing mini-case studies to illustrate quantitative data and…

  16. 78 FR 24669 - Reorganization of Regulations on the Adjudication of Department of Homeland Security Practitioner...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-26

    ... DEPARTMENT OF JUSTICE Executive Office for Immigration Review 8 CFR Parts 1003 and 1292 [EOIR... Immigration Review, Department of Justice. ACTION: Final rule. SUMMARY: This final rule adopts without change... interim rule amended regulations of the Executive Office for Immigration Review (EOIR) at the Department...

  17. 76 FR 76609 - Implementation of Office of Management and Budget Guidance on Drug-Free Workplace Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    ... removing its regulation implementing the Governmentwide common rule on drug-free workplace requirements for....) as a part of omnibus drug legislation. Federal agencies issued an interim final common rule to... Governmentwide common rule on nonprocurement suspension and debarment. The agencies issued a final common rule...

  18. 40 CFR 24.02 - Issuance of initial orders; definition of final orders and orders on consent.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION AGENCY GENERAL RULES GOVERNING ISSUANCE OF AND ADMINISTRATIVE HEARINGS ON INTERIM STATUS... following a final decision by the Regional Administrator, or after thirty days from issuance if no hearing... in these procedures to the Regional Administrator shall be understood to be to the Assistant...

  19. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...

  20. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...

  1. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...

  2. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...

  3. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... aircraft, even though the aircraft manufacturer's aircraft data package is preliminary, if the sponsor...) Within twelve months of the release of the final aircraft data package by the aircraft manufacturer, but... apply for initial qualification in accordance with § 60.15 based on the final aircraft data package...

  4. Treatability Study in Support of Intrinsic Remediation for Site ST41. Elmendorf Air Force Base, Anchorage, Alaska

    DTIC Science & Technology

    1995-10-01

    BTEX on the shallow groundwater system at the site. Site history and the results of soil and groundwater investigations conducted previously are also...or predicted future, concentrations and distribution. Whether in conjunction with the interim 1 remedial action system already in place or not...L:\\45007\\st4 I rept\\st41 finl.doc D 0 • 0 • 0 0 0 0 • 6 FINAL 4 22 years, depending upon the effectiveness of the interim remedial action (IRA) system

  5. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  6. EPA's Final Financial Assistance Conflict of Interest Policy

    EPA Pesticide Factsheets

    EPA has established the following revised interim policy governing disclosure of actual and potential conflicts of interest (COI Policy) by applicants for, and recipients of, federal financial assistance awards from EPA.

  7. Risk management. National Aeronautics and Space Administration (NASA). Interim rule adopted as final with changes.

    PubMed

    2000-11-22

    This is a final rule amending the NASA FAR Supplement (NFS) to emphasize considerations of risk management, including safety, security (including information technology security), health, export control, and damage to the environment, within the acquisition process. This final rule addresses risk management within the context of acquisition planning, selecting sources, choosing contract type, structuring award fee incentives, administering contracts, and conducting contractor surveillance.

  8. Data breaches. Final rule.

    PubMed

    2008-04-11

    This document adopts, without change, the interim final rule that was published in the Federal Register on June 22, 2007, addressing data breaches of sensitive personal information that is processed or maintained by the Department of Veterans Affairs (VA). This final rule implements certain provisions of the Veterans Benefits, Health Care, and Information Technology Act of 2006. The regulations prescribe the mechanisms for taking action in response to a data breach of sensitive personal information.

  9. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  10. Settlement study : final report.

    DOT National Transportation Integrated Search

    1982-09-01

    This report covers field observations of several medium and high embankments' settlement along Interstate Highways 12 and 20. The predictive settlements from laboratory tests (consolidation tests) are given in an interim report published in July, 198...

  11. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    PubMed

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  12. Instructional System Design for Executive Orientation and Project Management Training Packages, Technical Memorandum No. 3. Interim Report. RF Project No. 3131-A1.

    ERIC Educational Resources Information Center

    Cook, Desmond L.; And Others

    This memorandum reports on the third phase, the design, of a four-phase project to design project management training materials for local educational agencies. The first section of the memorandum explains some considerations regarding management education and the organization of the report. Section 2 presents the design specifications for the…

  13. Army Systems Engineering Career Development Model

    DTIC Science & Technology

    2014-01-30

    Army Systems Engineering Career Development Model Interim Technical Report SERC -2014-TR-042-1 January 30, 2014 Principal Investigators Dr. Val...Gavito, Stevens Institute of Technology Dr. Michael Pennotti, Stevens Institute of Technology Task Order 004, RT 104 Report No. SERC -2014-TR-042-1...Institute of Technology 8. PERFORMING ORGANIZATION REPORT NUMBER SERC -2014-TR-042-1 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) DASD

  14. The Analytic Onion: Examining Training Issues from Different Levels of Analysis. Interim Technical Paper for Period July 1989-June 1991.

    ERIC Educational Resources Information Center

    Lamb, Theodore A.; Chin, Keric B. O.

    This paper proposes a conceptual framework based on different levels of analysis using the metaphor of the layers of an onion to help organize and structure thinking on research issues concerning training. It discusses the core of the "analytic onion," the biological level, and seven levels of analysis that surround that core: the individual, the…

  15. The variable polarity plasma arc welding process: Its application to the Space Shuttle external tank

    NASA Technical Reports Server (NTRS)

    Nunes, A. C., Jr.; Bayless, O. E., Jr.; Jones, C. S., III; Munafo, A. P.; Wilson, W. A.

    1983-01-01

    The technical history of the variable polarity plasma arc (VPPA) welding process being introduced as a partial replacement for the gas shielded tungsten arc process in assembly welding of the space shuttle external tank is described. Interim results of the weld strength qualification studies, and plans for further work on the implementation of the VPPA process are included.

  16. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, R.S.; Diamante, J.M.; Duffey, R.B.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less

  17. 76 FR 21812 - Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-19

    ... (44 U.S.C. chapter 35). List of Subjects in 48 CFR Parts 209 and 252 Government procurement. Mary...-AG78 Defense Federal Acquisition Regulation Supplement; Ownership or Control by a Foreign Government...). ACTION: Final rule. SUMMARY: DoD is adopting as a final rule, without change, an interim rule that...

  18. 78 FR 14012 - Use of Materials Derived From Cattle in Human Food and Cosmetics; Reopening of the Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-04

    ... potential risk of bovine spongiform encephalopathy (BSE) in human food, including dietary supplements, and... final rule prohibited the use of certain cattle material to address the potential risk of BSE in human... interim final rule to designate materials that could potentially contain BSE infectivity as specified risk...

  19. The Evaluation of Oral/Aural Skills within the BA Finals Examination: Analysis and Interim Proposals.

    ERIC Educational Resources Information Center

    Crawshaw, Robert

    An examination of the principles and techniques of oral testing in British university-level final examinations in modern languages discusses: (1) the shortcomings of present oral testing procedures; (2) the theoretical controversy surrounding the design and value of oral proficiency tests, arising from research in English as a second language…

  20. 75 FR 13425 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-39; Small Entity Compliance Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... 2008 National Defense Authorization Act. V Trade Agreements--Costa Rica, Oman, and Peru. 2008-036..., Oman, and Peru (FAR Case 2008- 036) The Councils have adopted as final, without change, an interim rule... United States-Oman Free Trade Agreement, and the United States-Peru Trade Promotion Agreement. This final...

  1. Modeling and simulation of maintenance treatment in first-line non-small cell lung cancer with external validation.

    PubMed

    Han, Kelong; Claret, Laurent; Sandler, Alan; Das, Asha; Jin, Jin; Bruno, Rene

    2016-07-13

    Maintenance treatment (MTx) in responders following first-line treatment has been investigated and practiced for many cancers. Modeling and simulation may support interpretation of interim data and development decisions. We aimed to develop a modeling framework to simulate overall survival (OS) for MTx in NSCLC using tumor growth inhibition (TGI) data. TGI metrics were estimated using longitudinal tumor size data from two Phase III first-line NSCLC studies evaluating bevacizumab and erlotinib as MTx in 1632 patients. Baseline prognostic factors and TGI metric estimates were assessed in multivariate parametric models to predict OS. The OS model was externally validated by simulating a third independent NSCLC study (n = 253) based on interim TGI data (up to progression-free survival database lock). The third study evaluated pemetrexed + bevacizumab vs. bevacizumab alone as MTx. Time-to-tumor-growth (TTG) was the best TGI metric to predict OS. TTG, baseline tumor size, ECOG score, Asian ethnicity, age, and gender were significant covariates in the final OS model. The OS model was qualified by simulating OS distributions and hazard ratios (HR) in the two studies used for model-building. Simulations of the third independent study based on interim TGI data showed that pemetrexed + bevacizumab MTx was unlikely to significantly prolong OS vs. bevacizumab alone given the current sample size (predicted HR: 0.81; 95 % prediction interval: 0.59-1.09). Predicted median OS was 17.3 months and 14.7 months in both arms, respectively. These simulations are consistent with the results of the final OS analysis published 2 years later (observed HR: 0.87; 95 % confidence interval: 0.63-1.21). Final observed median OS was 17.1 months and 13.2 months in both arms, respectively, consistent with our predictions. A robust TGI-OS model was developed for MTx in NSCLC. TTG captures treatment effect. The model successfully predicted the OS outcomes of an independent study based on interim TGI data and thus may facilitate trial simulation and interpretation of interim data. The model was built based on erlotinib data and externally validated using pemetrexed data, suggesting that TGI-OS models may be treatment-independent. The results supported the use of longitudinal tumor size and TTG as endpoints in early clinical oncology studies.

  2. Long-term storage facility for reactor compartments in Sayda Bay - German support for utilization of nuclear submarines in Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolff, Dietmar; Voelzke, Holger; Weber, Wolfgang

    2007-07-01

    The German-Russian project that is part of the G8 initiative on Global Partnership Against the Spread of Weapons and Materials of Mass Destruction focuses on the speedy construction of a land-based interim storage facility for nuclear submarine reactor compartments at Sayda Bay near Murmansk. This project includes the required infrastructure facilities for long-term storage of about 150 reactor compartments for a period of about 70 years. The interim storage facility is a precondition for effective activities of decommissioning and dismantlement of almost all nuclear-powered submarines of the Russian Northern Fleet. The project also includes the establishment of a computer-assisted wastemore » monitoring system. In addition, the project involves clearing Sayda Bay of other shipwrecks of the Russian navy. On the German side the project is carried out by the Energiewerke Nord GmbH (EWN) on behalf of the Federal Ministry of Economics and Labour (BMWi). On the Russian side the Kurchatov Institute holds the project management of the long-term interim storage facility in Sayda Bay, whilst the Nerpa Shipyard, which is about 25 km away from the storage facility, is dismantling the submarines and preparing the reactor compartments for long-term interim storage. The technical monitoring of the German part of this project, being implemented by BMWi, is the responsibility of the Federal Institute for Materials Research and Testing (BAM). This paper gives an overview of the German-Russian project and a brief description of solutions for nuclear submarine disposal in other countries. At Nerpa shipyard, being refurbished with logistic and technical support from Germany, the reactor compartments are sealed by welding, provided with biological shielding, subjected to surface treatment and conservation measures. Using floating docks, a tugboat tows the reactor compartments from Nerpa shipyard to the interim storage facility at Sayda Bay where they will be left on the on-shore concrete storage space to allow the radioactivity to decay. For transport of reactor compartments at the shipyard, at the dock and at the storage facility, hydraulic keel blocks, developed and supplied by German subcontractors, are used. In July 2006 the first stage of the reactor compartment storage facility was commissioned and the first seven reactor compartments have been delivered from Nerpa shipyard. Following transports of reactor compartments to the storage facility are expected in 2007. (authors)« less

  3. Corrective Action Glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-07-01

    The glossary of technical terms was prepared to facilitate the use of the Corrective Action Plan (CAP) issued by OSWER on November 14, 1986. The CAP presents model scopes of work for all phases of a corrective action program, including the RCRA Facility Investigation (RFI), Corrective Measures Study (CMS), Corrective Measures Implementation (CMI), and interim measures. The Corrective Action Glossary includes brief definitions of the technical terms used in the CAP and explains how they are used. In addition, expected ranges (where applicable) are provided. Parameters or terms not discussed in the CAP, but commonly associated with site investigations ormore » remediations are also included.« less

  4. Characterization of Atmospheric Aerosol Behavior and Climatic Effects by Analysis of SAGE 2 and Other Space, Air, and Ground Measurements

    NASA Technical Reports Server (NTRS)

    Livingston, John M.

    1999-01-01

    This report documents the research performed under NASA Ames Cooperative Agreement NCC 2-991, which covered the period 1 April 1997 through 31 March 1999. Previously, an interim technical report (Technical Report No. 1, 20 March 1998) summarized the work completed during the period 1 April 1997 through 31 March 1998. The objective of the proposed research was to advance our understanding of atmospheric aerosol behavior, aerosol-induced climatic effects, and the remote measurement and retrieval capabilities of spaceborne sensors such as SAGE II by combining and comparing data from these instruments and from airborne and ground-based instruments.

  5. Alaska Interim Land Cover Mapping Program; final report

    USGS Publications Warehouse

    Fitzpatrick-Lins, Katherine; Doughty, E.F.; Shasby, Mark; Benjamin, Susan

    1989-01-01

    In 1985, the U.S. Geological Survey initiated a research project to develop an interim land cover data base for Alaska as an alternative to the nationwide Land Use and Land Cover Mapping Program. The Alaska Interim Land Cover Mapping Program was subsequently created to develop methods for producing a series of land cover maps that utilized the existing Landsat digital land cover classifications produced by and for the major land management agencies for mapping the vegetation of Alaska. The program was successful in producing digital land cover classifications and statistical summaries using a common statewide classification and in reformatting these data to produce l:250,000-scale quadrangle-based maps directly from the Scitex laser plotter. A Federal and State agency review of these products found considerable user support for the maps. Presently the Geological Survey is committed to digital processing of six to eight quadrangles each year.

  6. Interim rules for amending ERISA disclosure requirements for group health plans; approval of information collection requirements--DoL. Interim rules; approval of information collection requirements.

    PubMed

    1997-07-07

    On April 8, 1997, the Department of Labor published interim final rules governing disclosure requirements for private sector group health plans (62 FR 16979). The rules implemented changes to made to certain provisions of the Employee Retirement Income Security Act of 1974 (ERISA), enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). In the April 8 publication, the Department submitted its revision of the currently approved collection regarding Summary Plan Description requirements under ERISA to the Office of Management and Budget (OMB) for emergency review under the Paperwork Reduction Act of 1965 (PRA 95). This document amends the April 8 Federal Register document to properly display the OMB control number, 1210-0039.

  7. Current good manufacturing practices, quality control procedures, quality factors, notification requirements, and records and reports, for infant formula. Final rule.

    PubMed

    2014-06-10

    The Food and Drug Administration (FDA or we) is issuing a final rule that adopts, with some modifications, the interim final rule (IFR) entitled "Current Good Manufacturing Practices, Quality Control Procedures, Quality Factors, Notification Requirements, and Records and Reports, for Infant Formula'' (February 10, 2014). This final rule affirms the IFR's changes to FDA's regulations and provides additional modifications and clarifications. The final rule also responds to certain comments submitted in response to the request for comments in the IFR.

  8. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  9. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummins, G.D.

    This request is submitted to seek interim approval to operate a Toxic Substances Control Act (TSCA) of 1976 chemical waste landfill for the disposal of polychlorinated biphenyl (PCB) waste. Operation of a chemical waste landfill for disposal of PCB waste is subject to the TSCA regulations of 40 CFR 761. Interim approval is requested for a period not to exceed 5 years from the date of approval. This request covers only the disposal of small 10 quantities of solid PCB waste contained in decommissioned, defueled submarine reactor compartments (SRC). In addition, the request applies only to disposal 12 of thismore » waste in Trench 94 of the 218-E-12B Burial Ground (Trench 94) in the 13 200 East Area of the US Department of Energy`s (DOE) Hanford Facility. Disposal of this waste will be conducted in accordance with the Compliance 15 Agreement (Appendix H) between the DOE Richland Operations Office (DOE-RL) and 16 the US Environmental Protection Agency (EPA), Region 10. During the 5-year interim approval period, the DOE-RL will submit an application seeking final 18 approval for operation of Trench 94 as a chemical waste landfill, including 19 any necessary waivers, and also will seek a final dangerous waste permit from 20 the Washington State Department of Ecology (Ecology) for disposal of lead 21 shielding contained in the SRCS.« less

  11. 77 FR 4492 - Endangered and Threatened Wildlife and Plants; Reissuance of Interim Special Rule for the Polar Bear

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-30

    ... order in regard to Misc. No. 08- 764 (EGS) MDL Docket No. 1993 IN RE: POLAR BEAR ENDANGERED SPECIES ACT... (Service), published a final rule listing the polar bear (Ursus maritimus) as a threatened species... Special Rule for the Polar Bear AGENCY: Fish and Wildlife Service, Interior. ACTION: Final rule. SUMMARY...

  12. 75 FR 23821 - Final License Renewal Interim Staff Guidance LR-ISG-2009-01: Aging Management of Spent Fuel Pool...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-04

    ... approach acceptable to the NRC staff for meeting the requirements of 10 CFR part 54. On December 1, 2009... nuclear power plant spent fuel pool neutron-absorbing materials for compliance with part 54... Regulations (10 CFR part 54). The final LR-ISG revises the NRC staff's aging management recommendations...

  13. 78 FR 59859 - Defense Federal Acquisition Regulation Supplement: Allowability of Legal Costs for Whistleblower...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... considered in the formation of a final rule. ADDRESSES: Submit comments identified by DFARS Case 2013-D022... (for DoD only) and two FAR cases (for title 41 agencies), which are independent, but parallel... response to this interim rule in the formation of the final rule. List of Subjects in 48 CFR Parts 216 and...

  14. 76 FR 58846 - Final Interim Staff Guidance: Review of Evaluation To Address Gas Accumulation Issues in Safety...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... of the comments. A document comparing the version of the ISG that went out for public comment and the final version of the ISG can be found under ADAMS Accession No. ML111170302. ADDRESSES: Publicly... its issued staff guidance in the agency external web page ( http://www.nrc.gov/reading-rm/doc...

  15. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  16. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  17. Development of Career Opportunities for Technicians in the Nuclear Medicine Field, Phase I. Interim Report Number 1: Survey of Job Characteristics, Manpower Needs and Training Resources, July 1969.

    ERIC Educational Resources Information Center

    Technical Education Research Center, Cambridge, MA.

    Phase I of a multiphase research program in progress at the Technical Education Research Center, Inc., was conducted to analyze needs and resources in terms of job performance tasks, career opportunities, and training requirements for nuclear medical technicians. Data were gathered through personal interviews with 203 persons, mostly physicians,…

  18. Field Demonstration of Light Obscuration Particle Counting Technologies to Detect Fuel Contaminates

    DTIC Science & Technology

    2016-12-01

    to detect fuel contamiation including particulates and free water 15. SUBJECT TERMS fuel, JP-8, aviation fuel, contamination, free water ...undissolved water , F24 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT none 18. NUMBER OF PAGES 12 19a. NAME OF RESPONSIBLE PERSON Joel...technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the time during

  19. Refractometry and Extinguishment/Burnback Testing of Pacific Air Forces AFFF

    DTIC Science & Technology

    2006-04-01

    AFRL-ML-TY-TR-2006-4536 REFRACTOMETRY AND EXTINGUISHMENT/ BURNBACK TESTING OF PACIFIC AIR FORCES AFFF Jennifer L. Kalberer...NAME OF RESPONSIBLE PERSON 19b. TELEPHONE NUMBER (Include area code) 31-04-2006 Interim Technical Report 01-08-2005 -- 30-09-2005 Refractometry and...AFRL) performed refractometry and extinguishment/burnback tests on samples of Ansulite and 3M aqueous film forming foam (AFFF) from an overseas air

  20. Electrical and Thermal Transport Property Studies of High-Temperature Thermoelectric Materials.

    DTIC Science & Technology

    1985-06-01

    THERMAL TRANSPORT PROPERTY STUDIES OF HIGH-TEMPERATURE THERMOELECTRIC MATERIALS: INTERIM TECHNICAL REPORT FOR THE PERIOD MAY 15, 1984 TO MAY 15, 1985 J. L...transport property data base has been expanded oy continued measurements in several systems under study, and a theoretical model for thermoelectric ...6.0 REFERENCES . . . . . . . . . . . . 6.1 APPENDIX A - THERMOELECTRIC PROPERTY DATA . . . . . . . A. I 1l FIGURES 3.1 Dimensionless Figure of Merit

  1. 75 FR 2013 - Health Information Technology: Initial Set of Standards, Implementation Specifications, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ...The Department of Health and Human Services (HHS) is issuing this interim final rule with a request for comments to adopt an initial set of standards, implementation specifications, and certification criteria, as required by section 3004(b)(1) of the Public Health Service Act. This interim final rule represents the first step in an incremental approach to adopting standards, implementation specifications, and certification criteria to enhance the interoperability, functionality, utility, and security of health information technology and to support its meaningful use. The certification criteria adopted in this initial set establish the capabilities and related standards that certified electronic health record (EHR) technology will need to include in order to, at a minimum, support the achievement of the proposed meaningful use Stage 1 (beginning in 2011) by eligible professionals and eligible hospitals under the Medicare and Medicaid EHR Incentive Programs.

  2. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  3. Chronic toxicity studies on 1,3,5-trinitrobenzene in Fischer 344 rats. Final report, 1 May 1993-30 April 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reddy, T.V.; Daniel, F.B.; Olson, G.R.

    1996-02-01

    Chronic toxic effects of I ,3,5-tnnitriotrobenzene (TNB) in male and female Fischer rats were evaluated by feeding certified powdered laboratory chow diet supplemented with varied concentrations of TNB (0, 5, 60 and 300 mg/kg diet). The study was designed to accommodate three interim sacrifices (10 rats/group/sex) at 90, 180 and 365 days. The final sacrifice was performed after two years. All data related to these interim sacrifices are presented independently in appendices J to L. The calculated average TNB consumption for females was 0.23, 2.68 and 13.31 mg/kg/day and was 0.22, 2.64 and 13.44 mg/kg/day for males. Terminal body weightsmore » were significantly decreased in both sexes in the 300 mg/kg group. Relative spleen weights were decreased in both sexes in the 300 mg/kg group while brain weights were increased in females in this same group. Methemoglobin was increased in both sexes in the 300 mg/kg group while other hematological effects noted at the interim sacrifice times were not evident at two years. Histopathological examinations suggested treatment related changes in both sexes involving the kidneys (cytoplasmic/hyaline droplets) in the 60 and 300 mg/kg groups and the spleen (erythroid cell hyperplasia and pigment deposition) in the 300 mg/kg group. The cytoplasmic/hyaline droplets were characterized by immunohistochemistry as alpha-2u-globulin. These renal droplets were also noted at the interim sacrifice times. A no observed adverse effect level (NOAEL) was established in this study at 2.68 mg/kg b.w./day for F-344 rats administered TNB for two years.« less

  4. Predicting High Occupancy Vehicle Lane Demand, Final Report

    DOT National Transportation Integrated Search

    1996-08-01

    ">THIS REPORT PRESENTS THE INTERIM RESULTS OF THIS PROJECT, SPECIFICALLY: 1. A REVIEW OF THE AVAILABLE LITERATURE AND THE EXPERIENCES OF PUBLIC AGENCIES WITH CURRENT METHODS FOR PREDICTING THE DEMAND FOR HOV LANES, 2. THE PROPOSED NEW METHOD...

  5. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  6. Space station/base food system study. Book 1: Element concept data sheets

    NASA Technical Reports Server (NTRS)

    1970-01-01

    The detail engineering data sheets are presented for all concepts considered in the final phase of the study as well as those only carried through the interim phase due to non-applicability or deleted missions.

  7. Bringing English to Order: A Personal Account of the NCC English Evaluation Project.

    ERIC Educational Resources Information Center

    Clark, Urszula

    1994-01-01

    Provides a personal account of Great Britain's National Curriculum Committee's English Evaluation Project based at Warwick University. Describes the way the interim and final results of the committee were used by higher powers. (HB)

  8. 48 CFR 1509.170-8 - Contractor Performance Report.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contractor Performance... AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-8 Contractor Performance Report. (a) Contractor Performance Reports (interim and final) must be prepared...

  9. Evaluation of Stainless Steel Reinforcement in Bridge Decks.

    DOT National Transportation Integrated Search

    2007-10-01

    This report is a follow up and final report to the report on the Evaluation of Stainless Steel Reinforcement, Construction Report. RDT 03 003. The results of interim testing during the bridges first five years are reported for Missouris...

  10. 75 FR 81337 - Interim Final Regulation Deferring the Reporting Date for Certain Data Elements Required Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... Meat processing facilities. 311411 Frozen fruit, juice, and vegetable manufacturing facilities. 311421... volume conversion factor. Y 98.256(m)(3) Only total quantity of crude oil plus the quantity of...

  11. Interim Service ISDN Satellite (ISIS) simulator development for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.

    1992-01-01

    The simulation development associated with the network models of both the Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) and the Full Service ISDN Satellite (FSIS) architectures is documented. The ISIS Network Model design represents satellite systems like the Advanced Communications Technology Satellite (ACTS) orbiting switch. The FSIS architecture, the ultimate aim of this element of the Satellite Communications Applications Research (SCAR) Program, moves all control and switching functions on-board the next generation ISDN communications satellite. The technical and operational parameters for the advanced ISDN communications satellite design will be obtained from the simulation of ISIS and FSIS engineering software models for their major subsystems. Discrete event simulation experiments will be performed with these models using various traffic scenarios, design parameters, and operational procedures. The data from these simulations will be used to determine the engineering parameters for the advanced ISDN communications satellite.

  12. NASA/Navy Benchmarking Exchange (NNBE). Volume 1. Interim Report. Navy Submarine Program Safety Assurance

    NASA Technical Reports Server (NTRS)

    2002-01-01

    The NASA/Navy Benchmarking Exchange (NNBE) was undertaken to identify practices and procedures and to share lessons learned in the Navy's submarine and NASA's human space flight programs. The NNBE focus is on safety and mission assurance policies, processes, accountability, and control measures. This report is an interim summary of activity conducted through October 2002, and it coincides with completion of the first phase of a two-phase fact-finding effort.In August 2002, a team was formed, co-chaired by senior representatives from the NASA Office of Safety and Mission Assurance and the NAVSEA 92Q Submarine Safety and Quality Assurance Division. The team closely examined the two elements of submarine safety (SUBSAFE) certification: (1) new design/construction (initial certification) and (2) maintenance and modernization (sustaining certification), with a focus on: (1) Management and Organization, (2) Safety Requirements (technical and administrative), (3) Implementation Processes, (4) Compliance Verification Processes, and (5) Certification Processes.

  13. 77 FR 39057 - Rules of Practice for Adjudication Proceedings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...The Dodd-Frank Wall Street Reform and Consumer Protection Act requires the Bureau of Consumer Financial Protection (Bureau) to prescribe rules establishing procedures for the conduct of adjudication proceedings. On July 28, 2011, the Bureau published an interim final rule establishing these procedures with a request for comment. This final rule responds to the comments received by the Bureau and amends the Bureau's regulations accordingly.

  14. Research study on materials processing in space Skylab experiment M553 - sphere forming

    NASA Technical Reports Server (NTRS)

    Johnson, P. C.; Peters, E. T.; Wechsler, A. E.

    1973-01-01

    A research program was conducted to study the solidification of metals in the form of small spheres both in the one gravity environment of the earth laboratory and the low gravity environment of KC-135 trajectory flights and the Skylab 1/2 mission. The program had three phases. The details of the results of this program are contained in interim reports prepared at the conclusion of each of the three phases. This final report is intended to summarize the efforts and results described in detail in each of these interim reports, with particular emphasis on the differences observed between the ground-based and Skylab flight specimens.

  15. FAA (Federal Aviation Administration) Aviation Forecasts: Fiscal Years 1989-2000

    DTIC Science & Technology

    1989-03-01

    predict interim business cycles. FAA FORECAST ECONOMIC ASSUMPTIONS FISCAL YEARS 1989 - 2000 HISTORICAL FORECAST PERCENT AVERAGE ANNUAL GROWTH ECONOMIC ...During previous economic cycles, changes in the general aviation industry have generally paralleled changes in business activity. Empirical results have...FiFAA-APO 89- MARCH 198 US eat e T of 0rrs orci Fedra Aviatio Ad instato 0 NA II I1 Technical Report Documentation Page 1 ReotN.2. Government

  16. Development of Titanium Alloy Casting Technology

    DTIC Science & Technology

    1976-08-01

    reduction in melting temperatures (Table 8). (3 0 )Smeltzer, C.E., and Compton, W.A., "Titanium Braze System for High Temperature Applications", First...Compton, W. A., "Titanium Braze System for High Temperature Applications," First Interim Technical Report, Solar Division of International Harvester Co...Microstructures of the Phase 1I Ti-13Cu Alloy (Meat 2LO56) Showing the Effect of Various Aging Treatments After High Temperature Annealing 113 xi

  17. Analysis of Commercially Available Firefighting Helmet and Boot Options for the Joint Firefighter Integrated Response Ensemble (JFIRE)

    DTIC Science & Technology

    2012-02-01

    AFRL-RX-TY-TR-2012-0022 ANALYSIS OF COMMERCIALLY AVAILABLE HELMET AND BOOT OPTIONS FOR THE JOINT FIREFIGHTER INTEGRATED RESPONSE ENSEMBLE...Interim Technical Report 01-SEP-2010 -- 31-JAN-2011 Analysis of Commercially Available Firefighting Helmet and Boot Options for the Joint Firefighter...ensemble. A requirements correlation matrix was generated and sent to industry detailing objective and threshold measurements for both the helmet

  18. Remedy Selection and Land Use at Federal Facilities

    EPA Pesticide Factsheets

    Analysis of approximately 98 percent of the interim and final source control Records of Decision signed at Federal Facilities on the NPL from the beginning of Superfund through August 1995. PB96-963309. EPA/540/R-96/020. August 1996

  19. 77 FR 41671 - Extension of Interim Final Temporary Rule on Retail Foreign Exchange Transactions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Exchange Act,\\3\\ shall not enter into, or offer to enter into, a foreign exchange (``forex'') transaction... conditions as the Federal regulatory agency shall prescribe (``retail forex rule'').\\6\\ A Federal regulatory agency's [[Page 41672

  20. Snowplow operator driving time: survey of state and local practices : final report.

    DOT National Transportation Integrated Search

    2016-05-01

    In February 2015, Utah Department of Transportation (UDOT) issued interim guidance for continuous working : hours for UDOTs snowplow operators. Letter of Instruction 15-1 specified the number of hours that could be : worked by snowplow operators a...

  1. Interim guidance for implementing SAFETEA-LU provisions on planning, environment, and air quality for FHWA authorities

    DOT National Transportation Integrated Search

    2007-02-14

    This final rule revises the regulations governing the development of metropolitan transportation plans and programs for urbanized areas, State transportation plans and programs and the regulations for Congestion Management Systems. The revision resul...

  2. 48 CFR 1509.170-6 - Filing of forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 1509.170-6 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY ACQUISITION PLANNING CONTRACTOR QUALIFICATIONS Contractor Performance Evaluations 1509.170-6 Filing of forms. The original copy of completed Contractor Performance Reports (interim and final) shall be filed in each...

  3. Implementing Program Integrity from an HBCU Perspective: Progress, Problems, and Prospects. An Analysis of Part H, Program Integrity - TRIAD of the Higher Education Act and the Final Rules and Related Interim Final Regulations Published in the "Federal Register" on April 29, 1994.

    ERIC Educational Resources Information Center

    Blakely, William A.

    This paper examines the impact and implications for the nation's 104 historically black colleges and universities (HBCUs) of the final regulations published in the April 29, 1994 "Federal Register" and traces both the legislative and regulatory history of Part H of the Higher Education Act provisions. The analysis addresses specific…

  4. tetrahydrocannabinol (delta-9-THC)] in Schedule II. Final rule.

    PubMed

    2017-11-22

    This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.

  5. Schedules of Controlled Substances: Table of Excluded Nonnarcotic Products: Nasal Decongestant Inhaler/Vapor Inhaler. Final rule.

    PubMed

    2016-02-08

    This final rule adopts, without change, the interim final rule that was published in the Federal Register on October 27, 2015. The Drug Enforcement Administration is amending the table of Excluded Nonnarcotic Products to update the company name for the drug product Nasal Decongestant Inhaler/Vapor Inhaler (containing 50 milligrams levmetamfetamine) to Aphena Pharma Solutions--New York, LLC. This over-the-counter, nonnarcotic drug product is excluded from the provisions of the Controlled Substances Act.

  6. Student Assistance General Provisions; Federal Pell Grant Program; Academic Competitiveness Grant Program; and National Science and Mathematics Access to Retain Talent Grant Program. Final Rule. Federal Register, Part IV, Department of Education, 34 CFR Parts 668, 690, and 691

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Secretary is adopting as final, with changes, interim final regulations in: 34 CFR part 691 for the Academic Competitiveness Grant (ACG) and National Science and Mathematics Access to Retain Talent Grant (National SMART Grant) programs; 34 CFR part 668 (Student Assistance General Provisions); and 34 CFR part 690 (Federal Pell Grant Program).…

  7. Review of the transport of selected radionuclides in the interim risk assessment for the Radioactive Waste Management Complex, Waste Area Group 7 Operable Unit 7-13/14, Idaho National Engineering and Environmental Laboratory, Idaho

    USGS Publications Warehouse

    Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.

    2005-01-01

    The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.

  8. Continuous Covariate Imbalance and Conditional Power for Clinical Trial Interim Analyses

    PubMed Central

    Ciolino, Jody D.; Martin, Renee' H.; Zhao, Wenle; Jauch, Edward C.; Hill, Michael D.; Palesch, Yuko Y.

    2014-01-01

    Oftentimes valid statistical analyses for clinical trials involve adjustment for known influential covariates, regardless of imbalance observed in these covariates at baseline across treatment groups. Thus, it must be the case that valid interim analyses also properly adjust for these covariates. There are situations, however, in which covariate adjustment is not possible, not planned, or simply carries less merit as it makes inferences less generalizable and less intuitive. In this case, covariate imbalance between treatment groups can have a substantial effect on both interim and final primary outcome analyses. This paper illustrates the effect of influential continuous baseline covariate imbalance on unadjusted conditional power (CP), and thus, on trial decisions based on futility stopping bounds. The robustness of the relationship is illustrated for normal, skewed, and bimodal continuous baseline covariates that are related to a normally distributed primary outcome. Results suggest that unadjusted CP calculations in the presence of influential covariate imbalance require careful interpretation and evaluation. PMID:24607294

  9. 75 FR 74045 - Guidance on Planning, Implementing, Maintaining, and Enforcing Institutional Controls at...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ..., Implementing, Maintaining, and Enforcing Institutional Controls at Contaminated Sites AGENCY: Environmental... stakeholder input regarding the issues addressed in the EPA interim final guidance, titled Institutional Controls: A Guide to Planning, Implementing, Maintaining, and Enforcing Institutional Controls at...

  10. Final Environmental Assessment for the CV-22 Interim Beddown

    DTIC Science & Technology

    2016-04-01

    as asbestos -containing materials and lead-based paints, depending on the age of the buildings demolished. The Proposed Action and proposed...Demolition could generate additional hazardous wastes and materials such as asbestos -containing materials and lead-based paints, depending on the

  11. Experimental use of geogrids as an alternative to gravel placement : fourth year interim and final report, October 2006.

    DOT National Transportation Integrated Search

    2006-10-01

    With the ongoing demand for improved infrastructure, the Maine Department of Transportation : (MaineDOT) continues to identify and evaluate new and innovative construction methods and materials. : The Departments Collector Highway Improvement Prog...

  12. Code of conduct for the International Space Station Crew. National Aeronautics and Space Administration (NASA). Interim final rule.

    PubMed

    2000-12-21

    NASA is issuing new regulations entitled "International Space Station Crew," to implement certain provisions of the International Space Station (ISS) Intergovernmental Agreement (IGA) regarding ISS crewmembers' observance of an ISS Code of Conduct.

  13. World Trade Center Health Program; Amendments to Definitions, Appeals, and Other Requirements. Final rule.

    PubMed

    2016-12-15

    In 2011 and 2012, the Secretary, Department of Health and Human Services (HHS), promulgated regulations designed to govern the World Trade Center (WTC) Health Program (Program), including the processes by which eligible responders and survivors may apply for enrollment in the Program, obtain health monitoring and treatment for WTC-related health conditions, and appeal enrollment and treatment decisions, as well as a process to add new conditions to the List of WTC-Related Health Conditions (List). After using the regulations for a number of years, the Administrator of the WTC Health Program identified potential improvements to certain existing provisions, including, but not limited to, appeals of enrollment, certification, and treatment decisions, as well as the procedures for the addition of health conditions for WTC Health Program coverage. He also identified the need to add new regulatory provisions, including, but not limited to, standards for the disenrollment of a WTC Health Program member and decertification of a certified WTC-related health condition. A notice of proposed rulemaking was published on August 17, 2016; this action addresses public comments received on that proposed rulemaking, as well as three interim final rules promulgated since 2011, and finalizes the proposed rule and three interim final rules.

  14. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ...The NRC staff is issuing its Final Interim Staff Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' Agencywide Documents Access and Management System (ADAMS) Accession No. ML102510119 for DC/ COL-ISG-021 and ADAMS Accession No. ML102510164 for Attachment 1 to DC/ COL-ISG-021. This ISG provides new guidance for applicants submitting a combined license (COL) or design certification (DC) application for new nuclear power reactors under Title 10 of the Code of Federal Regulations, part 52. In addition, it supplements the guidance provided to the NRC staff in NUREG-0800, ``Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,'' March 2007, Standard Review Plan (SRP), Section 8.3.1 and Sections 9.5.4 through 9.5.8. The NRC staff issues DC/COL-ISGs to facilitate activities associated with NRC review of applications for DCs and COLs. The NRC staff intends to incorporate DC/COL-ISG-021 into the next revision of SRP Section 8.3.1 and Sections 9.5.4 through 9.5.8 and Regulatory Guide 1.206, ``Combined License Applications for Nuclear Power Plants (LWR Edition),'' June 2007. Disposition: On February 3, 2010, the NRC staff issued proposed DC/ COL-ISG-021 on ``Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System,'' ADAMS Accession No. ML092640035. The NRC staff received comments on the proposed guidance. This final issuance resolves the majority of the comments. The NRC staff responses to these comments can be found in ADAMS Accession No. ML102510176.

  15. Manufacturing Technology for Apparel Automation. Phases 1 and 2.

    DTIC Science & Technology

    1987-07-15

    Modularized Work Unit Groups . . . . . . . 12 i +,. :.Aooesston For :".. NTIS GR.AA1 ’- " "D T I C T A B Unannounced [] ~Justification i Availability...The monthly interim reports are summarized in this semiannual report. Activity to date has included work performed by Ms. Carol Carrere Dr. T. G. Clapp...Management. Provide, in accordance with paragraph 3.1 of the Statement of Work (SOW), North Carolina State University’s Technical Proposal, Manufacturing

  16. Summary of Federal Aviation Administration Responses to National Transportation Safety Board Safety Recommendations.

    DTIC Science & Technology

    1981-01-01

    NASA was already being incorporated by several equipment manufacturers in their own development plans. A-78-29. In the interim, amend 14 CFR to...not necessary. Research and development previously accomplished by the U.S. Army and by NASA was already being incorporated by several equipment...by industry., On July 12, our Bureau of Technology hosted a U.S. Army/FAA/ NASA meeting to brief FAA and NASA representatives, at the technical level

  17. Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham

    The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, andmore » Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.« less

  18. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  19. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  20. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  1. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... described in this paragraph. (i) Required information. All IFQ first receivers must provide the following...

  2. Oilfield reclamation in mixed grass prairie restores nematode but not plant communities

    USDA-ARS?s Scientific Manuscript database

    Background/Questions/Methods: Energy development in North American grasslands involves developing oil well pads and access roads. Reclamation/revegetation is constant: interim reclaims are conducted when drilling is complete and pumping commences, and final reclamation occurs upon cessation of well ...

  3. 76 FR 81789 - Consumer Leasing (Regulation M); Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1013 [Docket No. CFPB-2011-0026] RIN 3170-AA06 Consumer Leasing (Regulation M); Correction AGENCY: Bureau of Consumer Financial Protection. ACTION...). The interim final rule established a new Regulation M (Consumer Leasing) in accordance with the...

  4. Field testing of hand-held infrared thermography, phase II TPF-5(247) : final report.

    DOT National Transportation Integrated Search

    2016-05-01

    This report is the second of two volumes that document results from the pooled fund study TPF-5 (247), Development of : Handheld Infrared Thermography, Phase II. The interim report (volume I) studied the implementation of handheld thermography : by p...

  5. 48 CFR 1552.242-72 - Financial administrative contracting officer.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Negotiate advance agreements applicable to treatment of costs and to Independent Research & Development/Bid and Proposal costs. (3) Negotiate changes to interim billing rates and establish final indirect cost... contracting officer. 1552.242-72 Section 1552.242-72 Federal Acquisition Regulations System ENVIRONMENTAL...

  6. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  7. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  8. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  9. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  10. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... beyond July 31, 1975, shall apply any reasonable interim measures of control designed to reduce the... progress shall include, but not be limited to: Submittal of the final control plan to the Administrator... of component parts to accomplish emission control equipment or process modification; completion of...

  11. 77 FR 4674 - State Fiscal Stabilization Fund Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... and competing priorities that States were facing in meeting the SFSF data collection and reporting... the interim final requirement (i.e., the notice of proposed revisions to certain data collection and... collection instructions; respondents can provide the requested data in the desired format; reporting burden...

  12. 75 FR 80335 - Federal Government Participation in the Automated Clearing House

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... Participation in the Automated Clearing House AGENCY: Financial Management Service, Fiscal Service, Treasury. ACTION: Interim final rule. SUMMARY: The Department of the Treasury, Financial Management Service (FMS... include the agency name (``Financial Management Service'') and docket number FISCAL-FMS-2010- 0003 for...

  13. CONTROL OF MERCURY EMISSIONS FROM COAL-FIRED ELECTRIC UTILITY BOILERS: INTERIM REPORT

    EPA Science Inventory

    The report provides additional information on mercury (Hg) emissions control following the release of "Study of Hazardous Air Pollutant Emissions from Electric Utility Steam Generating Units--Final Report to Congress" in February 1998. Chapters 1-3 describe EPA's December 2000 de...

  14. California; Bay Area Air Quality Management District; Determination To Defer Sanctions

    EPA Pesticide Factsheets

    EPA is making an interim final determination to defer imposition of sanctions based on a proposed determination that CARB submitted rules on behalf of BAAQMD that satisfy part D of the Clean Air Act for areas under the jurisdiction of the BAAQMD.

  15. Progress report on CCIR studies for guaranteeing access to the geostationary satellite orbit

    NASA Astrophysics Data System (ADS)

    Reinhart, E. E.

    Overall responsibility for preparing a report on the technical information necessary for the World Administrative Radio Conference to be held in the spring of 1984 is vested in the Interim Working Party (IWP) 4/1. The various approaches being considered by the IWP 4/1 to guarantee orbital access are described, along with the criteria that the party has proposed for evaluating and comparing the approaches. These approaches include the following: a regional detailed long-term (10-20 years) a priori allotment plan, a periodically revised (3-5 years) regional detailed allotment plan, a regional or subregional allotment plan with guaranteed access, guaranteed access by means of multilateral coordination, and coordination procedures and technical factors that are revised periodically.

  16. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies on two criteria: whether the concepts offered the potential for a significant scientific advance, and whether or not the concepts would benefit from the Constellation System. The committee determined that all of the concepts offered the possibility of a significant scientific advance, but it cautions that such an evaluation ultimately must be made by the decadal survey process, and it emphasizes that this interim report s evaluation should not be considered to be an endorsement of the scientific merit of these proposals, which must of course be evaluated relative to other proposals. The committee determined that seven of these concepts would benefit from the Constellation System, whereas four would not, but it stresses that this conclusion does not reflect an evaluation of the scientific merit of the projects, but rather an assessment of whether or not new capabilities provided by the Constellation System could significantly affect them. Some of the mission concepts, such as the Advanced Compton Telescope, already offer a significant scientific advance and fit easily within the mass and volume constraints of existing launch vehicles. Other mission concepts, such as the Palmer Quest proposal to drill through the Mars polar cap, are not constrained by the launch vehicle, but rather by other technology limitations. The committee evaluated the mission concepts as presented to it, aware nevertheless that proposing a far larger and more ambitious mission with the same science goals might be possible given the capabilities of the Ares V launch vehicle. (Such proposals can be submitted in response to the committee s request for information to be evaluated in its final report.) See Table S.1 for a summary of the Vision Missions, including their cost estimates, technical maturity, and reasons that they might benefit from the Constellation System. The committee developed several findings and recommendations.

  17. 76 FR 60706 - Practices and Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ... publication of nonprecedential Orders will serve the goal of openness in the Board's decision-making by giving... that the Board may issue a final decision and, when appropriate, order a date for compliance with that decision. The Board received comments concerning this interim rule from two individuals. The first...

  18. 78 FR 37719 - Interim Final Determination To Defer Sanctions; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... Determination To Defer Sanctions; California; South Coast Air Quality Management District AGENCY: Environmental... Quality Management District's (SCAQMD) portion of the California State Implementation Plan (SIP) published... California submitted the ``South Coast Air Quality Management District Proposed Contingency Measures for the...

  19. 76 FR 9680 - Defense Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Subjects in 48 CFR Part 217 Government procurement. Mary Overstreet, Editor, Defense Acquisition... Federal Acquisition Regulation Supplement; Limitations on Procurements With Non-Defense Agencies (DFARS...: Final rule. SUMMARY: DoD is adopting without change an interim rule amending the Defense Federal...

  20. 75 FR 742 - Temporary Rule Regarding Principal Trades With Certain Advisory Clients

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... , Office of Investment Adviser Regulation, Division of Investment Management, Securities and Exchange... the Investment Advisers Act of 1940, the interim final temporary rule that establishes an alternative means for investment advisers who are registered with the Commission as broker-dealers to meet the...

  1. Obama's Education Record

    ERIC Educational Resources Information Center

    Petrilli, Michael; Eberhardt, Tyson

    2012-01-01

    In the fourth and final year of the first term of the Obama administration, enough time has elapsed to provide an opportunity for at least an interim assessment. Senator Lamar Alexander has commented that he has "a lot of admiration" for Obama's education secretary, Arne Duncan, and "respect" for the president's "positions…

  2. 76 FR 23487 - Race to the Top Fund

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... according to its share of the national population of children ages 5 through 17 and identifying natural breaks in the population numbers. The Department then developed overlapping budget ranges for each category based on the student population data. As explained in the preamble to the interim final...

  3. 48 CFR 52.216-7 - Allowable Cost and Payment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written understanding setting forth the final indirect cost rates. The understanding shall specify (i) the... special terms and the applicable rates. The understanding shall not change any monetary ceiling, contract... not subject to the interest penalty provisions of the Prompt Payment Act. Interim payments made prior...

  4. 77 FR 31724 - Exchange Visitor Program-Summer Work Travel; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF STATE 22 CFR Part 62 RIN 1400-AD14 [Public Notice 7902] Exchange Visitor Program--Summer Work Travel; Correction AGENCY: Department of State. ACTION: Interim final rule; correction SUMMARY: This document contains minor corrections to the Exchange Visitor Program--Summer Work Travel...

  5. 77 FR 38717 - Supplemental Standards of Ethical Conduct for Employees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Standards of Ethical Conduct for Employees AGENCY: Special Inspector General for Afghanistan Reconstruction... the concurrence of the Office of Government Ethics (OGE), is adopting as final, without changes, an interim rule for SIGAR employees that will supplement the executive branch-wide Standards of Ethical...

  6. 78 FR 894 - Interim Final Determination To Stay Sanctions, Imperial County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... Determination To Stay Sanctions, Imperial County Air Pollution Control District AGENCY: Environmental Protection... imposition of sanctions based on a proposed approval of revisions to the Imperial County Air Pollution... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...

  7. Applications of Piezoelectric and Pyroelectric Thin Films: Opportunities for Langmuir-Blodgett Technology.

    DTIC Science & Technology

    1984-12-31

    LII IH"L 5 B 1.4 1111.6 MICROCOPY RESOLUTION TEST CHART SECURITY CLASSIFICATION OF THIS PAGE (MS’ien Dare Itere d) RED DSTUC ONS REPORT ...DOCUMENTATION PAGE BEFORE COMPLETIG FORM R NUMER . GOVT ACCESSION NO 5. RECIPIENT’S CATALOG iUMBER • TR-09 4. TITLE ( nd Subttle) S. TYPE OF REPORT A PERIOD...COVERELs Applications of Piezoelectric and Pyroelectric Technical Report -Interim Thin Films: Opportunities for Langmuir-Blodgett Technology 6. PERFORMING

  8. Tribology of Langmuir-Blodgett Films

    DTIC Science & Technology

    1992-03-01

    poly - meric systems and the use of Langmuir - Blodgett films as lubricants. An, 1473 ESWnoW’oP’-oVsS osOLe UNCLASSIFIED SECUlRTV CLASSIFICATIONi O r ThIS...N/A N/A 4. TITLE (and Subtitle) S. TyPE OF REPORT & PERIOD COVERED Tribology of Langmuir - Blodgett Films Interim Technical Report 6. PERFORMING ORO...Co . - e o If neceesea mnd Identily by block number) Tribology, Langmuir - Blodgett Films 2 AerNACT t 44 Pem.e s* I peminp and tdolvart by block niber

  9. COCHISE Observations of Argon Rydberg Emission from 2 to 16 Micrometers.

    DTIC Science & Technology

    1983-08-05

    8217natu 5 I RNDALL E. M YJOHN S . GARIG Branch Cief Division Director Qualified requestors may obtain additional copies from the Defense Technical... S . TYPE or REPORT a PERIOD COVERED COCHISE OBSERVATIONS OF ARGON Scientific. Interim. RYDBERG EMISSION FROM 2 TO 16 6. PERFORMING 0140. REPORT NUMMER...Comparisons of obd~erved and simulated spectra sliow that s i.ntial ",WIR emission (- 1~gmm Arises from Rydberg states ert~ DO .W-1473 fDITION OF I NOV 65

  10. Interim Report on Feasibility of Improving Recreation Access and Related Water and Land Management in the Buffalo Metropolitan Area, New York.

    DTIC Science & Technology

    1979-04-01

    Buffalo Metropolitan Study Area. One of these is the Lake Plain, a relatively flat and fertile agricultural belt which is wide in the northern portion of...events. Evidence of this can be seen in numerous highway relocations where secondary roads follow stream courses closely. A field reconnaissance was made...shrub and tree growth encroaching on the high water stream channel can be seen immediately upstream of the eroding area. The SCS has provided technical

  11. Impact of Learning Styles on Air Force Technical Training: Multiple and Linear Imagery in the Presentation of a Comparative Visual Location Task to Visual and Haptic Subjects. Interim Report for Period January 1977-January 1978.

    ERIC Educational Resources Information Center

    Ausburn, Floyd B.

    A U.S. Air Force study was designed to develop instruction based on the supplantation theory, in which tasks are performed (supplanted) for individuals who are unable to perform them due to their cognitive style. The study examined the effects of linear and multiple imagery in presenting a task requiring visual comparison and location to…

  12. The role of interim 18F-FDG PET/CT in prediction of response to ipilimumab treatment in metastatic melanoma.

    PubMed

    Sachpekidis, Christos; Anwar, Hoda; Winkler, Julia; Kopp-Schneider, Annette; Larribere, Lionel; Haberkorn, Uwe; Hassel, Jessica C; Dimitrakopoulou-Strauss, Antonia

    2018-07-01

    The aim of the present study was to assess the value of interim 18 F-FDG PET/CT performed after the first two cycles of ipilimumab treatment in the prediction of the final clinical response to this type of immunotherapy. The study group comprised 41 patients with unresectable metastatic melanoma scheduled for ipilimumab therapy. Whole-body 18 F-FDG PET/CT was performed before the start of ipilimumab treatment (baseline PET/CT) and after the initial two cycles of ipilimumab treatment (interim PET/CT). Evaluation of patient response to treatment was based on the European Organization for Research and Treatment of Cancer (EORTC) 1999 criteria for PET as well as the recently proposed PET Response Evaluation Criteria for Immunotherapy (PERCIMT). The patients' best clinical response, assessed at a median of 21.4 months (range 6.3-41.9 months) was used as reference. According to their best clinical response, the patients were divided into two groups: those showing clinical benefit (CB) including stable disease, partial response and complete response (31 patients), and those showing no clinical benefit (no-CB including progressive disease (10 patients). According to the EORTC criteria, interim PET/CT demonstrated progressive metabolic disease (PMD) in 20 patients, stable metabolic disease (SMD) in 11 patients, partial metabolic response (PMR) in 8 patients, and complete metabolic response (CMR) in 2 patients. According to the PERCIMT, interim PET/CT demonstrated PMD in 9 patients, SMD in 24 patients, PMR in 6 patients and CMR in 2 patients. On the basis of the interim PET, the patients were divided in a similar manner to the division according to clinical response into those showing metabolic benefit (MB) including SMD, PMR and CMR, and those showing no metabolic benefit (no-MB) including PMD. According to this dichotomization, the EORTC criteria showed a sensitivity (correctly predicting CB) of 64.5%, a specificity (correctly predicting no-CB) of 90.0%, a positive predictive value (PPV) of 95.2%, a negative predictive value (NPV) of 45.0% and an accuracy of 70.7% in predicting best clinical response. The PERCIMT showed a sensitivity of 93.6%, a specificity of 70.0%, a PPV of 90.6%, a NPV of 77.8% and an accuracy of 87.8%. The McNemar test showed that the PERCIMT had a significantly higher sensitivity than EORTC criteria (p = 0.004), while there was no significant difference in specificity (p = 0.5). The agreement between the two sets of criteria was poor (McNemar test p = 0.001, and accordingly kappa = 0.46). The application of the recently proposed PERCIMT to interim 18 F-FDG PET/CT provides a more sensitive predictor of final clinical response to immunotherapy than the application of the EORTC criteria in patients with metastatic melanoma.

  13. Explorative analyses on the value of interim PET for prediction of response in pediatric and adolescent non-Hodgkin lymphoma patients

    PubMed Central

    2013-01-01

    Background This study is to evaluate the predictive value of FDG-PET (PET) in pediatric and adolescent patients suffering from non-Hodgkin lymphoma (pNHL) in comparison to information provided by conventional imaging methods (CIM). Methods Imaging was performed at baseline and at interim (after 2 cycles of chemotherapy). The response assessment in PET was carried out visually and semi-quantitatively, the latter one by use of percentage decrease in SUVmax from baseline to interim (ΔSUVmax). The PET-based results were compared to the findings by CIM. Progression-free survival (PFS) was analyzed using Kaplan-Meier curves (KM) and log-rank test. Results The final study included 16 patients (mean follow-up time, 60.2 months (range, 4.0 to 85.7 months)). Relapse occurred in four patients. Visual PET compared to CIM revealed higher sensitivity (3/4 vs 1/4) and NPV (6/7 vs 10/13), and equal PPV (3/9 vs 1/3), but lower specificity (6/12 vs 10/12) and accuracy (9/16 vs 11/16). False-positive findings in PET at interim were predominantly observed in patients presenting bulky disease (5/6), whereas CIM was true-negative in all of these cases. KM analyses revealed no significant differences in 5-year PFS neither for CIM (76.9% vs 66.7%; p = 0.67) nor for visual PET (85.7% vs 66.7%; p = 0.34) nor for ΔSUVmax (88.9% vs 57.1%; p = 0.12). Conclusions The predictive value of iPET in pediatric patients suffering from NHL was limited due to considerably high amount of false-positive findings, especially in patients suffering from bulky disease. However, due to our limited sample size, final conclusions cannot be drawn and, thus, call for further evaluation of PET in pNHL in larger and more homogenous patient series. PMID:24139528

  14. Interim heterogeneity changes measured using entropy texture features on T2-weighted MRI at 3.0 T are associated with pathological response to neoadjuvant chemotherapy in primary breast cancer.

    PubMed

    Henderson, Shelley; Purdie, Colin; Michie, Caroline; Evans, Andrew; Lerski, Richard; Johnston, Marilyn; Vinnicombe, Sarah; Thompson, Alastair M

    2017-11-01

    To investigate whether interim changes in hetereogeneity (measured using entropy features) on MRI were associated with pathological residual cancer burden (RCB) at final surgery in patients receiving neoadjuvant chemotherapy (NAC) for primary breast cancer. This was a retrospective study of 88 consenting women (age: 30-79 years). Scanning was performed on a 3.0 T MRI scanner prior to NAC (baseline) and after 2-3 cycles of treatment (interim). Entropy was derived from the grey-level co-occurrence matrix, on slice-matched baseline/interim T2-weighted images. Response, assessed using RCB score on surgically resected specimens, was compared statistically with entropy/heterogeneity changes and ROC analysis performed. Association of pCR within each tumour immunophenotype was evaluated. Mean entropy percent differences between examinations, by response category, were: pCR: 32.8%, RCB-I: 10.5%, RCB-II: 9.7% and RCB-III: 3.0%. Association of ultimate pCR with coarse entropy changes between baseline/interim MRI across all lesions yielded 85.2% accuracy (area under ROC curve: 0.845). Excellent sensitivity/specificity was obtained for pCR prediction within each immunophenotype: ER+: 100%/100%; HER2+: 83.3%/95.7%, TNBC: 87.5%/80.0%. Lesion T2 heterogeneity changes are associated with response to NAC using RCB scores, particularly for pCR, and can be useful across all immunophenotypes with good diagnostic accuracy. • Texture analysis provides a means of measuring lesion heterogeneity on MRI images. • Heterogeneity changes between baseline/interim MRI can be linked with ultimate pathological response. • Heterogeneity changes give good diagnostic accuracy of pCR response across all immunophenotypes. • Percentage reduction in heterogeneity is associated with pCR with good accuracy and NPV.

  15. 76 FR 28661 - Interim Final Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Determination To Defer Sanctions, Sacramento Metro 1-Hour Ozone Nonattainment Area, California AGENCY... Act (CAA) Section 185 fee program (Termination Determination) for the Sacramento Metro 1- hour Ozone nonattainment area (Sacramento Metro Area) to satisfy anti- backsliding requirements for the 1-hour Ozone...

  16. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  17. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  18. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  19. 40 CFR 265.112 - Closure plan; amendment of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND.... By May 19, 1981, or by six months after the effective date of the rule that first subjects a facility... description of other activities necessary during the partial and final closure periods to ensure that all...

  20. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  1. 40 CFR 265.226 - Monitoring and inspection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operating level for two consecutive months, the amount of liquids in the sumps must be recorded at least... (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... period. (2) After the final cover is installed, the amount of liquids removed from each leak detection...

  2. Tri-level study of the causes of traffic accidents : interim report 1. Vol. 1, research findings

    DOT National Transportation Integrated Search

    1973-08-31

    This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University institute for Research in Public Safety ...

  3. 77 FR 19525 - National School Lunch Program: School Food Service Account Revenue Amendments Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... National School Lunch Program: School Food Service Account Revenue Amendments Related to the Healthy, Hunger-Free Kids Act of 2010; Approval of Information Collection Request AGENCY: Food and Nutrition Service, USDA. ACTION: Interim final rule; approval of information collection request. SUMMARY: The Food...

  4. 77 FR 39112 - State Official Notification Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... BUREAU OF CONSUMER FINANCIAL PROTECTION 12 CFR Part 1082 [Docket No. CFPB-2011-0005] RIN 3170-AA02... the SUPPLEMENTARY INFORMATION. V. Section-by-Section Summary Section 1082.1(a) Notice Requirement Section 1082.1(a) of the Interim Final Rule sets out the timing and process for notice by State Officials...

  5. Tri-level study of the causes of traffic accidents : interim report 1. Vol. 2 : appendices

    DOT National Transportation Integrated Search

    1973-08-31

    This is the final report of the first year of activity under a proposed three-year program entitled "Tri-Level Study of the Causes of Traffic Accidents." This study has been performed by the Indiana University Institute for Research in Public Safety ...

  6. 40 CFR 435.30 - Applicability; description of the onshore subcategory.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 30 2014-07-01 2014-07-01 false Applicability; description of the onshore subcategory. 435.30 Section 435.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... been considered “coastal” as defined under the interim final regulations for this industry (40 CFR 435...

  7. 40 CFR 435.30 - Applicability; description of the onshore subcategory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 31 2012-07-01 2012-07-01 false Applicability; description of the onshore subcategory. 435.30 Section 435.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... been considered “coastal” as defined under the interim final regulations for this industry (40 CFR 435...

  8. 40 CFR 435.30 - Applicability; description of the onshore subcategory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 30 2011-07-01 2011-07-01 false Applicability; description of the onshore subcategory. 435.30 Section 435.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... been considered “coastal” as defined under the interim final regulations for this industry (40 CFR 435...

  9. 40 CFR 435.30 - Applicability; description of the onshore subcategory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 31 2013-07-01 2013-07-01 false Applicability; description of the onshore subcategory. 435.30 Section 435.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... been considered “coastal” as defined under the interim final regulations for this industry (40 CFR 435...

  10. 40 CFR 435.30 - Applicability; description of the onshore subcategory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Applicability; description of the onshore subcategory. 435.30 Section 435.30 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... been considered “coastal” as defined under the interim final regulations for this industry (40 CFR 435...

  11. Hazardous Waste Management System - Identification and Listing of Hazardous Waste - Toxicity Characteristic - Hydrocarbon Recovery Operations - Federal Register Notice, October 5, 1990

    EPA Pesticide Factsheets

    The Agency is promulgating an interim final rule to extend the compliance date of the Toxicity Characteristic rule for petroleum refining facilities, marketing terminals and bulk plants engaged in the recovery and remediation operation for 120 days.

  12. 76 FR 46621 - Group Health Plans and Health Insurance Issuers Relating to Coverage of Preventive Services Under...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ...This document contains amendments to the interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding preventive health services.

  13. 75 FR 5499 - Claims for Compensation; Death Gratuity Under the Federal Employees' Compensation Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... for Compensation; Death Gratuity Under the Federal Employees' Compensation Act AGENCY: Office of... Labor (DOL) published an interim final rule in order to administer the death gratuity created by section... provides a death gratuity payment to eligible survivors of federal employees and non-appropriated fund...

  14. Comparison of "saw and seal" procedure and performance grade binder to minimize thermal cracking : interim report - fourth year/final report.

    DOT National Transportation Integrated Search

    2008-12-01

    In an effort to compare performance and cost effectiveness of the Saw and Seal procedure and : Performance Grade (PG) binders, the Maine Department of Transportation (MaineDOT) constructed an : experimental project in Weston, Maine during the f...

  15. 7 CFR 91.24 - Reports of test results.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Reports of test results. 91.24 Section 91.24... SERVICES AND GENERAL INFORMATION Reporting § 91.24 Reports of test results. (a) Results of analyses are... may call the appropriate Science and Technology laboratory for interim or final results prior to...

  16. 78 FR 26504 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 127 RIN 3245-AG55 Women-Owned Small Business Federal Contract Program AGENCY: U.S. Small Business Administration. ACTION: Interim final rule. SUMMARY: The U.S. Small Business Administration (SBA) is amending its regulations to implement Section 1697 of the...

  17. 76 FR 79767 - Truth in Lending (Regulation Z)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... analysis of potential benefits, costs, and impacts.\\14\\ The Bureau believes that the interim final rule... obligations on consumers or covered persons and is not expected to have any impact on consumers' access to... potential reduction of access by consumers to consumer financial products or services; the impact on...

  18. 76 FR 79441 - Equal Credit Opportunity (Regulation B)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... Regulations, at (202) 435-7700. SUPPLEMENTARY INFORMATION: I. Background The Equal Credit Opportunity Act... 1061(b)(5)(C)(i). III. Legal Authority A. Rulemaking Authority The Bureau is issuing this interim final... Notification Forms Appendix D to Part 1002--Issuance of Official Interpretations Supplement I to Part 1002...

  19. 77 FR 4800 - Notice of Petition for Waiver of Hussmann From the Department of Energy Commercial Refrigerator...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... for interim waiver; and (4) DOE rulemakings and waivers regarding commercial refrigeration equipment... authority to establish and amend test procedures for commercial refrigeration equipment. On December 8, 2006, DOE published a final rule adopting test procedures for commercial refrigeration equipment, effective...

  20. District-Charter Collaboration Grant Implementation: Final Findings from Interviews and Site Visits. Interim Report

    ERIC Educational Resources Information Center

    McCullough, Moira; Keating, Betsy; Heinkel, Luke

    2016-01-01

    In November 2012, the Bill & Melinda Gates Foundation invested in seven innovative district-charter partnerships with "the potential capacity and commitment to accelerate student college ready rates through deep collaboration and sharing of best practices" (District-Charter Collaboration Grant Request for Proposal). These…

  1. 76 FR 35445 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-17

    ... Information Collection: Medical Loss Ratio Quarterly Reporting; Use: Under Section 2718 of the Affordable Care... ratio, referred to as the medical loss ratio (MLR). An interim final rule (IFR) implementing the MLR was... information collections, please reference the document identifier or OMB control number. To be assured...

  2. 76 FR 54697 - Certification of Factual Information To Import Administration During Antidumping and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... Portal (``Portal'') at http://www.regulations.gov . Any questions concerning file formatting, document... Portal. See Interim Final Rule on Certification of Factual Information To Import Administration During... complete to the best of my knowledge. I am aware that the information contained in this submission may be...

  3. 78 FR 21520 - Sweet Cherries Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 923 [Doc. No. AMS-FV-12-0026... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... decreased the assessment rate established for the Washington Cherry Marketing Committee (Committee) for the...

  4. 78 FR 21518 - Apricots Grown in Designated Counties in Washington; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 922 [Doc. No. AMS-FV-12-0027...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The... the assessment rate established for the Washington Apricot Marketing Committee (Committee) for the...

  5. 75 FR 80675 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ... FEDERAL RESERVE SYSTEM 12 CFR Part 226 [Regulation Z; Docket No. R-1394] Truth in Lending AGENCY... information. The interim final rule amends Regulation Z, which implements the Truth in Lending Act, in order...- 1394), amending Regulation Z (Truth in Lending) to implement provisions of the Dodd-Frank Wall Street...

  6. 76 FR 56116 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...

  7. 76 FR 56114 - Interim Final Determination to Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-12

    ... Determination to Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental...

  8. California; Bay Area Air Quality Management District; Proposed Approval of Stationary Sources New Source Review

    EPA Pesticide Factsheets

    EPA is making an interim final determination to defer imposition of sanctions based on a proposed determination that CARB submitted rules on behalf of BAAQMD that satisfy part D of the Clean Air Act for areas under the jurisdiction of the BAAQMD.

  9. Overview of Federal Motor Carrier Safety Administration safety training research for new entrant motor carriers : [research brief].

    DOT National Transportation Integrated Search

    2015-07-01

    In 2002, the Federal Motor Carrier Safety Administration (FMCSA) issued the New Entrant Program Interim Final Rule in response to the requirement in the Motor Carrier Safety Improvement Act of 1999. The requirement in the Act was based on research fi...

  10. 76 FR 7500 - Indian Trust Management Reform-Implementation of Statutory Changes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-10

    ... changes also affect the purchase of small fractional interests at probate by restricting who may purchase without consent and what interests may be purchased without consent. DATES: This interim final rule is.... Purchase at Probate B. Permanent Improvements 1. Rule of Descent When Decedent Died Intestate 2...

  11. 75 FR 75884 - Regulations Regarding Income-Related Monthly Adjustment Amounts to Medicare Beneficiaries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... premiums. This new subpart implements changes made to the Social Security Act (Act) by the Affordable Care... SOCIAL SECURITY ADMINISTRATION 20 CFR Part 418 [Docket No. SSA-2010-0029] RIN 0960-AH22... Coverage Premiums AGENCY: Social Security Administration. ACTION: Interim final rule with request for...

  12. 76 FR 80733 - Extension of Temporary Registration of Municipal Advisors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 [Release No. 34-66020; File No. S7-19-10] RIN 3235-AK69 Extension of Temporary Registration of Municipal Advisors AGENCY: Securities and Exchange Commission. ACTION: Interim final temporary rule; extension. SUMMARY: The Securities and Exchange Commission...

  13. 14 CFR 1274.933 - Summary of recipient reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... bar exists, otherwise within 2 years 1274.913 Patent Rights—Retention by the Recipient (Small Business... As required 1274.911 Patent Rights(Paragraph (b)(4)) Interim Report of Reportable Items Every 12 months 1274.912 Patent Rights—Retention by the Recipient (Large Business)(Paragraph (e)(3)(i)) Final...

  14. 76 FR 56949 - Biomass Crop Assistance Program; Corrections

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    .... ACTION: Interim rule; correction. SUMMARY: The Commodity Credit Corporation (CCC) is amending the Biomass... funds in favor of the ``project area'' portion of BCAP. CCC is also correcting errors in the regulation... INFORMATION: Background CCC published a final rule on October 27, 2010 (75 FR 66202-66243) implementing BCAP...

  15. Civilian Health and Medical Program of the Uniformed Services (CHAMPUS); TRICARE Retired Reserve. Final rule.

    PubMed

    2014-12-31

    TRICARE Retired Reserve (TRR) is a premium-based TRICARE health plan available for purchase worldwide by qualified members of the Retired Reserve and by qualified survivors of TRR members. This final rule responds to public comments received to an interim final rule that was published in the Federal Register on August 6, 2010 (75 FR 47452-47457). That rule established requirements and procedures to implement the TRR program in fulfillment of section 705 of the National Defense Authorization Act for Fiscal Year 2010 (NDAA-10) (Pub. L. 111-84). This final rule also revises requirements and procedures as indicated.

  16. Energy policy act transportation study: Interim report on natural gas flows and rates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-17

    This report, Energy Policy Act Transportation Study: Interim Report on Natural Gas Flows and Rates, is the second in a series mandated by Title XIII, Section 1340, ``Establishment of Data Base and Study of Transportation Rates,`` of the Energy Policy Act of 1992 (P.L. 102--486). The first report Energy Policy Act Transportation Study: Availability of Data and Studies, was submitted to Congress in October 1993; it summarized data and studies that could be used to address the impact of legislative and regulatory actions on natural gas transportation rates and flow patterns. The current report presents an interim analysis of naturalmore » gas transportation rates and distribution patterns for the period from 1988 through 1994. A third and final report addressing the transportation rates and flows through 1997 is due to Congress in October 2000. This analysis relies on currently available data; no new data collection effort was undertaken. The need for the collection of additional data on transportation rates will be further addressed after this report, in consultation with the Congress, industry representatives, and in other public forums.« less

  17. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Astrophysics Data System (ADS)

    Committee On Science Opportunities Enabled By Nasa'S Constellation System, National Research Council

    To begin implementation of the Vision for Space Exploration (recently renamed "United States Space Exploration Policy"), NASA has begun development of new launch vehicles and a human-carrying spacecraft that are collectively called the Constellation System. In November 2007, NASA asked the NRC to evaluate the potential for the Constellation System to enable new space science opportunities. For this interim report, 11 existing "Vision Mission" studies of advanced space science mission concepts inspired by earlier NASA forward-looking studies were evaluated. The focus was to assess the concepts and group them into two categories: more-deserving or less deserving of future study. This report presents a description of the Constellation System and its opportunities for enabling new space science opportunities, and a systematic analysis of the 11 Vision Mission studies. For the final report, the NRC issued a request for information to the relevant communities to obtain ideas for other mission concepts that will be assessed by the study committee, and several issues addressed only briefly in the interim report will be explored more fully.

  18. Evaluation of Hose in Hose Transfer Line Service Life for Hanfords Interim Stabilization Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    TORRES, T.D.

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program (Torres, 2000a), defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of waste transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program (Torres, 2000b), has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications associated with Interim Stabilization. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will bemore » exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning, RPP-6028 Section 3.2.7. Performance Incentive Number ORP-05 requires that all the Single Shell Tanks be Interim Stabilized by September 30, 2003. The Tri-Party Agreement (TPA) milestone M-41-00, enforced by a federal consent decree, requires all the Single Shell Tanks to be Interim stabilized by September 30, 2004. By meeting the Performance Incentive the TPA milestone is met. Prudent engineering dictates that the equipment used to transfer waste have a life in excess of the forecasted operational time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer, published literature and calculations. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are the hose material's resistance to the harmful effects of process fluid characteristics, ambient environmental conditions, exposure to ionizing radiation and the manufacturer's stated shelf life. In order to determine the transfer line service life this evaluation examines the certification of shelf life, the certification of chemical compatibility with waste, catalog information of ambient ratings and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials. During initial hose procurements, the hose-in-hose transfer line vendor River Bend Hose Specialty (RBHS) submitted a letter, dated 6/8/00, which recommended the service and shelf life of the hose to be seven years. In submittals for later hose procurements, RBHS submitted a letter, dated 11/6/00, which recommended the service life of the hose to be three years. This submittal was followed by documentation, on 2/14/01, which submitted new storage requirements and restated the seven year shelf life. RBHS revised their original hose service life estimate to a more conservative three years due to concerns over the effects of chemicals in transferred waste. The above mentioned submittals from RBHS are the primary drivers of the three year service life limit established by this document.« less

  19. Success of Two-Stage Reimplantation in Patients Requiring an Interim Spacer Exchange.

    PubMed

    George, Jaiben; Miller, Evan M; Curtis, Gannon L; Klika, Alison K; Barsoum, Wael K; Mont, Michael A; Higuera, Carlos A

    2018-03-23

    Some patients undergoing a 2-stage revision for a periprosthetic joint infection require a repeat spacer in the interim (removal of existing spacer with insertion of a new spacer or spacer exchange) due to persistent infection. The objectives of this study are to (1) determine the factors associated with patients who receive a repeat spacer and (2) compare the infection-free survival (overall and stratified by joint type) of reimplantation in patients who did or did not receive a repeat spacer. From 2001 to 2014, 347 hip or knee 2-stage revisions that finally underwent reimplantation and had a minimum 2-year follow-up were identified. An interim spacer exchange was performed in 59 (17%) patients (exchange cohort). Patient-related and organism-related factors were compared between the exchange and non-exchange cohorts. Kaplan-Meier survival curves were performed to assess the success (absence of signs of infection, reoperation for infection, periprosthetic joint infection-related mortality) of both cohorts. Patients in the exchange group had higher comorbidity score (P = .020), prolonged time to reimplantation (P < .001), and higher prevalence of resistant organisms, though not statistically significant (P = .091). The 5-year infection-free survival rates were 64% (knee 62%, hip 64%) in the exchange cohort, and 78% (knee 77%, hip 78%) in the non-exchange cohort (P = .020). Patients requiring an interim spacer exchange were found to have more comorbidities, prolonged treatment period, and were more likely to be infected with a resistant organism. About one-third of such patients became reinfected within 5 years compared to only one-fifth of the patients without an interim spacer exchange. Copyright © 2018 Elsevier Inc. All rights reserved.

  20. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  1. Online Monitoring Technical Basis and Analysis Framework for Emergency Diesel Generators - Interim Report for FY 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Binh T. Pham; Nancy J. Lybeck; Vivek Agarwal

    The Light Water Reactor Sustainability program at Idaho National Laboratory is actively conducting research to develop and demonstrate online monitoring capabilities for active components in existing nuclear power plants. Idaho National Laboratory and the Electric Power Research Institute are working jointly to implement a pilot project to apply these capabilities to emergency diesel generators and generator step-up transformers. The Electric Power Research Institute Fleet-Wide Prognostic and Health Management Software Suite will be used to implement monitoring in conjunction with utility partners: Braidwood Generating Station (owned by Exelon Corporation) for emergency diesel generators, and Shearon Harris Nuclear Generating Station (owned bymore » Duke Energy Progress) for generator step-up transformers. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for emergency diesel generators. Emergency diesel generators provide backup power to the nuclear power plant, allowing operation of essential equipment such as pumps in the emergency core coolant system during catastrophic events, including loss of offsite power. Technical experts from Braidwood are assisting Idaho National Laboratory and Electric Power Research Institute in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the Fleet-Wide Prognostic and Health Management Software Suite and tested using data from Braidwood. Parallel research on generator step-up transformers was summarized in an interim report during the fourth quarter of fiscal year 2012.« less

  2. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2013-01-01 2013-01-01 false Contents of applications; technical information in final...

  3. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2012-01-01 2012-01-01 false Contents of applications; technical information in final...

  4. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2014-01-01 2014-01-01 false Contents of applications; technical information in final...

  5. 10 CFR 52.157 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; technical information in final safety analysis report. The application must contain a final safety analysis...) Information sufficient to demonstrate compliance with the applicable requirements regarding testing, analysis... 10 Energy 2 2011-01-01 2011-01-01 false Contents of applications; technical information in final...

  6. Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLEN, TARA S.

    2002-12-01

    These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less

  7. Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem

    PubMed Central

    Williams, Patricia AH; Woodward, Andrew J

    2015-01-01

    The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat. PMID:26229513

  8. Cybersecurity vulnerabilities in medical devices: a complex environment and multifaceted problem.

    PubMed

    Williams, Patricia Ah; Woodward, Andrew J

    2015-01-01

    The increased connectivity to existing computer networks has exposed medical devices to cybersecurity vulnerabilities from which they were previously shielded. For the prevention of cybersecurity incidents, it is important to recognize the complexity of the operational environment as well as to catalog the technical vulnerabilities. Cybersecurity protection is not just a technical issue; it is a richer and more intricate problem to solve. A review of the factors that contribute to such a potentially insecure environment, together with the identification of the vulnerabilities, is important for understanding why these vulnerabilities persist and what the solution space should look like. This multifaceted problem must be viewed from a systemic perspective if adequate protection is to be put in place and patient safety concerns addressed. This requires technical controls, governance, resilience measures, consolidated reporting, context expertise, regulation, and standards. It is evident that a coordinated, proactive approach to address this complex challenge is essential. In the interim, patient safety is under threat.

  9. Membrane Bioreactor/Ultra Low Energy Reverse Osmosis Membrane Process for Forward Operating Base Wastewater Reuse

    DTIC Science & Technology

    2014-08-01

    of the GEGR pilot membrane coater; b) configuration of the coating station; and c) web path of the dip-knife coating process for RO membrane...Energy-dispersive X-ray spectroscopy EPA Environmental Protection Agency F:M Food-To-Microorganism Ratio FOB Forward Operating Base FT- IR Fourier...report 03/2014 3.3 Submit draft Interim report/Go No-Go decision point white paper 05/2013 3.4 Submit final report 05/2014 3.5 Final debrief

  10. NASA Safety and Health (Short Form). Final rule

    NASA Technical Reports Server (NTRS)

    2001-01-01

    This final rule adopts with changes the interim rule published in the Federal Register on April 5, 2001 (65 FR 18051-18053), which amended the NASA FAR Supplement to implement a Safety and Health (Short Form) clause to address safety and occupational health in all NASA contracts above the micro-purchase threshold where the existing Safety and Health clause did not apply, and amended other safety and health clauses to be consistent with the new NASA Safety and Health (Short Form) clause.

  11. 75 FR 29183 - Office of the Chief Financial Officer; Department of Agriculture Implementation of OMB Guidance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... participants in lower-tier covered transactions with whom I intend to do business? Subpart D--Responsibilities... exclusions from covered transactions and codifies a statutory permanent debarment provision. This action also... transactions. Finally, this interim rule implements Section 14211 of the Food, Conservation, and Energy Act of...

  12. 22 CFR 96.101 - Notification of temporary accreditation decisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... uniform notification date to be established by the Secretary pursuant to § 96.58(a). On that date, the... accreditation decisions to any agency or to the public until the uniform notification date. If the Secretary requests information on the interim or final status of an agency prior to the uniform notification date...

  13. 77 FR 29884 - Assessment of Fees on Large Bank Holding Companies and Nonbank Financial Companies Supervised by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... the development of policies, procedures, rules, and regulations and other planning activities of the... holding companies and foreign banking organizations; the interim final rule applies to nonbank financial... determination date. Foreign banking organizations that have eligible assets of $50 billion or more will be...

  14. 78 FR 10554 - Interim Final Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... Determination To Stay and Defer Sanctions, Sacramento Metropolitan Air Quality Management District AGENCY... on a proposed approval of a revision to the Sacramento Metropolitan Air Quality Management District... therefore is not subject to review by the Office of Management and Budget. This action is not subject to...

  15. 77 FR 1862 - Mailing of Tickets Under the Ticket to Work Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... Tickets Under the Ticket to Work Program AGENCY: Social Security Administration. ACTION: Interim final... Ticket to Work (Ticket) to disabled beneficiaries for participation in the Ticket to Work program (Ticket... beneficiaries who are most likely to return to work. We will send a Ticket to any eligible disabled beneficiary...

  16. 75 FR 66680 - Defense Federal Acquisition Regulation Supplement; Trade Agreements-New Thresholds (DFARS 2009-D040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... Trade Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the... of Subjects in 48 CFR Part 225 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition...: DoD is adopting as final, without change, the interim rule that amended the Defense Federal...

  17. 48 CFR 1852.216-77 - Award fee for end item contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contractor's performance for the entire contract will be evaluated to determine total earned award fee. No award fee or base fee will be paid to the Contractor if the final award fee evaluation is “poor... the Contractor's interim performance every 6* months to monitor Contractor performance prior to...

  18. Screening for contaminants of emerging concern in Northern Colorado Plateau Network waters: 2015 surface-water data

    USGS Publications Warehouse

    Weissinger, R; Battaglin, William A.; Bradley, Paul M.

    2016-01-01

    Patterns of detections at other sampling locations will be explored in future reports. This is an interim report. Limited sampling will continue in 2016 at selected sites in coordination with the USGS. A final report is expected upon completion of the USGS project in 2017.

  19. 75 FR 41787 - Requirement for Group Health Plans and Health Insurance Issuers To Provide Coverage of Preventive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Requirement for Group Health Plans and Health Insurance Issuers To Provide Coverage of Preventive Services... Insurance Oversight of the U.S. Department of Health and Human Services are issuing substantially similar interim final regulations with respect to group health plans and health insurance coverage offered in...

  20. Working Parents Project (WPP). Final Interim Report.

    ERIC Educational Resources Information Center

    Mason, Theresa; Espinoza, Renato

    Results are reported from a 2-year study designed to explore how the nature of women's jobs, as viewed by women and their husbands, influences the system of nuclear family relationships and affects parents' involvement with their children's schools. The research has evolved into a comparative exploratory study of the responses of 30 families to…

  1. 75 FR 13414 - Federal Acquisition Regulation; FAR Case 2008-012, Clarification of Submission of Cost or Pricing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...-AL12 Federal Acquisition Regulation; FAR Case 2008-012, Clarification of Submission of Cost or Pricing.... SUMMARY: The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (Councils) have adopted as final, with minor changes, an interim rule which amended the Federal Acquisition...

  2. 78 FR 33120 - Final Interim Staff Guidance LR-ISG-2011-04; Updated Aging Management Criteria for Reactor Vessel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ..., ``Generic Aging Lessons Learned Report'' (GALL Report), for the aging management of Pressurized Water... communicate insights and lessons learned and to address emergent issues not covered in license renewal... ensure that PWR license renewal applicants will adequately address age-related degradation and aging...

  3. 76 FR 27848 - Pears Grown in Oregon and Washington; Amendment To Allow Additional Exemptions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-10-0072...: Agricultural Marketing Service, USDA. ACTION: Adoption of interim rule as final. SUMMARY: The Department of... marketing order for Oregon-Washington pears that provides for the sale of fresh pears directly to consumers...

  4. 76 FR 78150 - Procedures for the Handling of Retaliation Complaints Under Section 806 of the Sarbanes-Oxley Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... of the Sarbanes-Oxley Act of 2002, as Amended; Correction AGENCY: Occupational Safety and Health Administration, Labor. ACTION: Interim final rule; correction. SUMMARY: The Occupational Safety and Health... DEPARTMENT OF LABOR Occupational Safety and Health Administration 29 CFR Part 1980 [Docket Number...

  5. 78 FR 28953 - William D. Ford Federal Direct Loan Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... students since July 1, 2011. Second, the law placed a limit on Direct Subsidized Loan eligibility for new... students to complete their academic programs in a timely manner. Timely completion of programs will allow... student loan debt. This interim final rule implements the required statutory changes. Summary of the Major...

  6. 77 FR 50016 - Extension of Interim Final Temporary Rule on Retail Foreign Exchange Transactions; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... file number should be included on the subject line if email is used. To help the Commission to process... and the pertinent addresses. List of Subjects in 17 CFR Part 240 Brokers, Consumer protection, Currency, Reporting and recordkeeping requirements. Dated: August 10, 2012. By the Commission. Elizabeth M...

  7. Information Technology Research: Investing in Our Future. Report to the President.

    ERIC Educational Resources Information Center

    National Coordination Office for Information Technology Research and Development, Arlington, VA.

    This is the final report on future directions for Federal support of research and development (R&D) for information technology. This report adds detail to the findings and recommendations in the interim report dated August 1998, and strengthens previous recommendations regarding the importance of social and economic research on the impacts of…

  8. 76 FR 72332 - Energy Conservation Program: Test Procedure for Microwave Ovens

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-23

    ... Energy Conservation Program: Test Procedure for Microwave Ovens AGENCY: Office of Energy Efficiency and.... Department of Energy (DOE) published an interim final rule on March 9, 2011, amending its test procedures for... standby mode and off mode power use by microwave ovens. Those amendments incorporated into the DOE test...

  9. Project Elderly. Interim and Final Reports.

    ERIC Educational Resources Information Center

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  10. 76 FR 65112 - Mission Compatibility Evaluation Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-20

    ... DEPARTMENT OF DEFENSE Office of the Secretary 32 CFR Part 211 [Docket ID: DOD-2011-OS-0054; RIN...: The Department of Defense (DoD) is issuing this interim final rule to implement section 358 of the Ike... with the Secretary of Transportation and received by the Department of Defense from the Secretary of...

  11. 75 FR 42575 - Electronic Signature and Storage of Form I-9, Employment Eligibility Verification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Electronic Signature and Storage of Form I-9, Employment Eligibility Verification AGENCY: U.S. Immigration... published an interim final rule to permit electronic signature and storage of the Form I-9. 71 FR 34510..., or a combination of paper and electronic systems; Employers may change electronic storage systems as...

  12. 76 FR 9213 - Small Business Jobs Act: 504 Loan Program Debt Refinancing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... negative impact on the availability of financing for small businesses. SBA finds that good cause exists to... 27, 2012 and would have less impact if delayed until notice and comment rulemaking could be completed... requiring Regulatory Impact Analysis as set forth below. A. Regulatory Objective of the Interim Final Rule...

  13. 41 CFR 102-2.30 - Where and in what formats is the FMR published?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... formats is the FMR published? 102-2.30 Section 102-2.30 Public Contracts and Property Management Federal... published? Proposed rules are published in the Federal Register. FMR bulletins are published in looseleaf format. FMR interim and final rules are published in the following formats— (a) Federal Register under...

  14. 76 FR 80924 - Boott Hydropower, Inc.; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... of the wooden flashboards with a pneumatic crest gate system of the same height and interim modifications to the existing flashboard system and concludes that authorizing the amendment, with appropriate... the Public Reference Room, or it may be viewed on the Commission's Web site at http://www.ferc.gov...

  15. 77 FR 11737 - Weatherization Assistance for Low-Income Persons: Maintaining the Privacy of Applicants for and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... information regarding recipients in the aggregate that does not identify specific individuals. However, a...-Income Persons: Maintaining the Privacy of Applicants for and Recipients of Services AGENCY: Office of.... Department of Energy (DOE) published an interim final rule on March 11, 2010, requiring that all States and...

  16. ATMS concept of operations and generic system requirements : task B : final interim report for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1993-10-01

    This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...

  17. 78 FR 59163 - Rules of Practice for Issuance of Temporary Cease-and-Desist Orders

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... any violation or practice specified in the notice of charges and to take affirmative action to prevent... the incomplete or inaccurate state of the books or records; or (2) Affirmative action to restore such... Financial Protection. ACTION: Interim final rule with request for public comment. SUMMARY: The Dodd-Frank...

  18. 32 CFR 174.11 - Leasing of real property to non-Federal entities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... 174.11 Section 174.11 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE... the Secretary determines that: (1) A public interest will be served as a result of the lease; and, (2...) Pending final disposition of an installation, the Secretary concerned may grant interim leases which are...

  19. 76 FR 67361 - Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... DEPARTMENT OF STATE 22 CFR Part 42 [Public Notice 7391] RIN 1400-AC86 Visas: Documentation of Immigrants Under the Immigration and Nationality Act, as Amended AGENCY: State Department. ACTION: Interim final rule. SUMMARY: This rule amends the Department of State's regulations relating to adoptions in...

  20. 77 FR 1857 - Women-Owned Small Business Federal Contract Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... accordance with the Administrative Procedures Act (APA) and SBA regulations. 5 U.S.C. 553 and 13 CFR 101.108. The APA provides an exception to this standard rulemaking process where an agency finds good cause to... quickly as possible. IV. Justification for Immediate Effective Date of Interim Final Rule The APA requires...

  1. 78 FR 11483 - Disclosure of Records and Information

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ....12(b) requires the Bureau to establish an electronic FOIA reading room on its Web site to house the... make such records available at its headquarters in a physical reading room that is accessible to the... interim final rule without modification, except that it updates the address of the reading room to reflect...

  2. 76 FR 45174 - State Official Notification Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... granted in section 1042(a) to enforce the Act or regulations prescribed thereunder. This interim final... actions or proceedings undertaken under section 1042(a) of the Act, 12 U.S.C. 5552(a), to enforce the Act... than 10 days prior to initiating an action to enforce the Act or any regulation prescribed thereunder...

  3. 78 FR 21521 - Pears Grown in Oregon and Washington; Assessment Rate Decrease for Processed Pears

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 927 [Doc. No. AMS-FV-12-0031... AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY... Committee locally administers the marketing order that regulates the handling of processed pears grown in...

  4. 76 FR 56507 - Availability of Information, Public Observation of Meetings, Procedure, Practice for Hearings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... to issue orders) with respect to the supervision of SLHCs and their non-depository subsidiaries... notice of intent also advised that the Board would issue an interim final rule to effectuate the... elimination of requirements in OTS rules for prefiling meetings and submission of draft business plans, and...

  5. 78 FR 56816 - Vidalia Onions Grown in Georgia; Change in Reporting and Assessment Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-16

    ... the following Web site: http://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 955 [Doc. No. AMS-FV-12-0071...: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule. SUMMARY: The...

  6. 78 FR 24983 - Domestic Dates Produced or Packed in Riverside County, California; Decreased Assessment Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ...://www.ams.usda.gov/MarketingOrdersSmallBusinessGuide ; or by contacting Jeffrey Smutny, Marketing Order... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service 7 CFR Part 987 [Docket No. AMS-FV-12-0035... Rate AGENCY: Agricultural Marketing Service, USDA. ACTION: Affirmation of interim rule as final rule...

  7. 77 FR 3559 - Energy Conservation Program for Consumer Products: Test Procedures for Refrigerators...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ..., which is typical of an approach enabled by more sophisticated electronic controls. Id. The interim final... and long- time automatic defrost or variable defrost control and adjust the default values of maximum... accurate measurement of the energy use of products with variable defrost control. DATES: The amendments are...

  8. 76 FR 59254 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  9. 76 FR 45199 - Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District, CA AGENCY... limited approval and limited disapproval of revisions to the San Joaquin Valley Unified Air Pollution... section 307(b)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control...

  10. 78 FR 6149 - Final Interim Staff Guidance Assessing the Radiological Consequences of Accidental Releases of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Accidental Releases of Radioactive Materials From Liquid Waste Tanks in Ground and Surface Waters for... Radioactive Materials from Liquid Waste Tanks in Ground and Surface Waters for Combined License Applications... Radioactive Materials from Liquid Waste Tanks in Ground and Surface Waters for Combined License Applications...

  11. 77 FR 72738 - Contracts and Provider Agreements for State Home Nursing Home Care

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ... State Home Nursing Home Care AGENCY: Department of Veterans Affairs. ACTION: Interim final rule. SUMMARY... into contracts or provider agreements with State homes for the nursing home care of certain disabled... submitted in response to ``RIN 2900-AO57--Contracts and Provider Agreements for State Home Nursing Home Care...

  12. 77 FR 24857 - Interim Final Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... Determination To Stay and Defer Sanctions, San Joaquin Valley Unified Air Pollution Control District AGENCY... on a proposed approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental regulations...

  13. 75 FR 44589 - Health Information Technology: Initial Set of Standards, Implementation Specifications, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ..., one of which included the ``use of certified EHR technology in a meaningful manner.'' This means that... comments received by ONC related to the Interim Final Rule. In some cases, due to the simultaneous... or eligible hospital would be required to use adopted standards. One commenter specifically requested...

  14. 76 FR 49650 - Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ...] Private Security Contractors (PSCs) Operating in Contingency Operations, Combat Operations or Other..., ``Contractor Personnel Authorized to Accompany the U.S. Armed Forces,'' which provides guidance for all DoD contractors operating in contingency operations. This Rule was published as an Interim Final Rule on July 17...

  15. EPA issues interim final waste minimization guidance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bergeson, L.L.

    1993-08-01

    The U.S. Environmental Protection Agency (EPA) has released a new and detailed interim final guidance to assist hazardous waste generators in certifying they have a waste minimization program in place under the Resource Conservation and Recovery Act (RCRA). EPA's guidance identifies the basic elements of a waste minimization program in place that, if present, will allow people to certify they have implemented a program to reduce the volume and toxicity of hazardous waste to the extent economically practical. The guidance is directly applicable to generators of 1000 or more kilograms per month of hazardous waste, or large-quantity generators, and tomore » owners and operators of hazardous waste treatment, storage or disposal facilities who manage their own hazardous waste on site. Small-quantity generators that generate more than 100 kilograms, but less than 1,000 kilograms, per month of hazardous waste are not subject to the same program in place certification requirement. Rather, they must certify on their manifests that they have made a good faith effort to minimize their waste generation.« less

  16. 76 FR 53763 - Immigration Benefits Business Transformation, Increment I

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ...The Department of Homeland Security (DHS) is amending its regulations to enable U.S. Citizenship and Immigration Services (USCIS) to migrate from a paper file-based, non-integrated systems environment to an electronic customer-focused, centralized case management environment for benefit processing. This transformation process will allow USCIS to streamline benefit processing, eliminate the capture and processing of redundant data, and reduce the number of and automate its forms. This transformation process will be a phased multi-year initiative to restructure USCIS business processes and related information technology systems. DHS is removing references to form numbers, form titles, expired regulatory provisions, and descriptions of internal procedures, many of which will change during transformation. DHS is also finalizing interim rules that permitted submission of benefit requests with an electronic signature when such requests are submitted in an electronic format rather than on a paper form and that removed references to filing locations for immigration benefits. In addition, in this rule DHS is publishing the final rule for six other interim rules published during the past several years, most of which received no public comments.

  17. BWR Spent Nuclear Fuel Integrity Research and Development Survey for UKABWR Spent Fuel Interim Storage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bevard, Bruce Balkcom; Mertyurek, Ugur; Belles, Randy

    The objective of this report is to identify issues and support documentation and identify and detail existing research on spent fuel dry storage; provide information to support potential R&D for the UKABWR (United Kingdom Advanced Boiling Water Reactor) Spent Fuel Interim Storage (SFIS) Pre-Construction Safety Report; and support development of answers to questions developed by the regulator. Where there are gaps or insufficient data, Oak Ridge National Laboratory (ORNL) has summarized the research planned to provide the necessary data along with the schedule for the research, if known. Spent nuclear fuel (SNF) from nuclear power plants has historically been storedmore » on site (wet) in spent fuel pools pending ultimate disposition. Nuclear power users (countries, utilities, vendors) are developing a suite of options and set of supporting analyses that will enable future informed choices about how best to manage these materials. As part of that effort, they are beginning to lay the groundwork for implementing longer-term interim storage of the SNF and the Greater Than Class C (CTCC) waste (dry). Deploying dry storage will require a number of technical issues to be addressed. For the past 4-5 years, ORNL has been supporting the U.S. Department of Energy (DOE) in identifying these key technical issues, managing the collection of data to be used in issue resolution, and identifying gaps in the needed data. During this effort, ORNL subject matter experts (SMEs) have become expert in understanding what information is publicly available and what gaps in data remain. To ensure the safety of the spent fuel under normal and frequent conditions of wet and subsequent dry storage, intact fuel must be shown to: 1.Maintain fuel cladding integrity; 2.Maintain its geometry for cooling, shielding, and subcriticality; 3.Maintain retrievability, and damaged fuel with pinhole or hairline cracks must be shown not to degrade further. Where PWR (pressurized water reactor) information is utilized or referenced, justification has been provided as to why the data can be utilized for BWR fuel.« less

  18. R&D on Composition and Processing of Titanium Aluminide Alloys for Turbine Engines

    DTIC Science & Technology

    1982-07-01

    45433. AUTHORITY AFWAL ltr, 6 Feb 1987 THIS PAGE IS UNCLASSIFIED AFWAL-TR-82-4086 R&D ON COMPOSITION AND PROCESSING4 OF TITANIUM ALUMINIDE ALLOYS FOR...TR-82-4086- 4. TITLE (and Subitfle) S TYPE OF REPORT I PERIOO COVEREO R&D ON COMPOSITION AND PROCESSING OF Interim Technical Report TITANIUM ALUMINIDE ...ILLUSTRATIONS FICURE PACE 1 As-received titanium aluminide ingots supplied 9 by RMI. (a) S/N 20007; (b) left to right, S/N 20008, S/N 20009, S/N 20010

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Balkwill, D.L.; Reeves, R.H.

    The present document is an interim technical report in which we describe the research which has been completed during the seven-month period since the start of the grant. Progress is summarized in two main areas. The first is microbiological characterization of subsurface materials from the Hanford reservation and the Idaho National Engineering Laboratory, and the second is phylogenetic characterization of these microorganisms. The major tools used for phylogenetic characterization are RFLP analysis of PCR derived material and 16S rRNA sequencing. A description of manuscripts ready for publication is also provided. 4 refs. (MHB)

  20. Analysis of Multiple-Impact Ballistic Performance of a Tempered Glass Laminate with a Strike Face Film

    DTIC Science & Technology

    2014-02-01

    a 0.18 in thick polymer interlayer between two layers of 0.5 in tempered silica based “ soda lime ” glass . A 0.08 in shatter resistant film was...AFCEC-CX-TY-TR-2014-0005 ANALYSIS OF MULTIPLE-IMPACT BALLISTIC PERFORMANCE OF A TEMPERED GLASS LAMINATE WITH A STRIKE FACE FILM Michael A. Magrini...Interim Technical Report 3 JAN 2012 to 2 JAN 2013 Analysis of Multiple-Impact Ballistic Performance of A Tempered Glass Laminate with a Strike Face Film

  1. Role Perceptions of Hispanic and Mainstream Navy Recruits.

    DTIC Science & Technology

    1982-12-01

    ACCESSION NO- 3. R9C’PI’NT’S CATALOG NUMBER 4. TITLE (and Subttl.e) S . TYPE of REPORT & PERIOO COVERED Role Perceptions of Hispanic and M4ainstream Interim...Technical Report Navy Recruits *. PERFORMING ORG. REPORT NUMBER 7. AUTHOR( s ) 6. CONTRACT OR GRANT NUMUER(a) Harry C. Triandis Judith Li3ansky Gerardo...T NU M E R S A Department of Psycholog~y University of Illinois NR 170-906 603 E. Daniel, Chamva.;vn, IL 6182__ II. CONTROLLING OFFICE NAME AND

  2. Effects of Solar Array Shadowing on the Power Capability of the Interim Control Module

    NASA Technical Reports Server (NTRS)

    Fincannon, James; Hojnicki, Jeffrey S.; Garner, James Christopher

    1999-01-01

    The Interim Control Module (ICM) is being built by the US Naval Research Laboratory (NRL) for NASA as a propulsion module for the International Space Station (ISS). Originally developed as a spinning spacecraft used to move payloads to their final orbit, for ISS, the ICM will be in a fixed orientation and location for long periods resulting in substantial solar panel shadowing. This paper describes the methods used to determine the incident energy incident energy on the ICM solar panels and the power capability of the electric power system (EPS). Applying this methodology has resulted in analyses and assessments used to identify ICM early design changes/options, placement and orientations that enable successful operation of the EPS under a wide variety of anticipated conditions.

  3. MODTRAN: a moderate resolution model for LOWTRAN. Technical report, 12 May 1986-11 May 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berk, A.; Bernstein, L.S.; Robertson, D.C.

    1987-07-08

    This interim technical report describes a new band-model formulation for the LOWTRAN 6 atmospheric transmittance/radiation computer code. Band-model parameters for H/sub 2/O, CO/sub 2/, O/sub 3/, CO, CH/sub 4/, O/sub 2/, and N/sub 2/ were calculated using the 1986 HITRAN line atlas. They were calculated for 1 /cm bins from 0 - 17,900/cm and at five temperatures from 200 to 300K. This transmittance model and associated subroutines were integrated into LOWTRAN 6. The spectral resolution of this new option is better than 5/cm (FWHM). A preliminary version of the code was delivered to AFGL for testing. Validation against FASCOD2 calculationsmore » will be the emphasis for the remainder of this effort.« less

  4. Nondestructive Assay Data Integration with the SKB-50 Assemblies - FY16 Update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tobin, Stephen Joseph; Fugate, Michael Lynn; Trellue, Holly Renee

    2016-10-28

    A project to research the application of non-destructive assay (NDA) techniques for spent fuel assemblies is underway at the Central Interim Storage Facility for Spent Nuclear Fuel (for which the Swedish acronym is Clab) in Oskarshamn, Sweden. The research goals of this project contain both safeguards and non-safeguards interests. These nondestructive assay (NDA) technologies are designed to strengthen the technical toolkit of safeguard inspectors and others to determine the following technical goals more accurately; Verify initial enrichment, burnup, and cooling time of facility declaration for spent fuel assemblies; Detect replaced or missing pins from a given spent fuel assembly tomore » confirm its integrity; and Estimate plutonium mass and related plutonium and uranium fissile mass parameters in spent fuel assemblies. Estimate heat content, and measure reactivity (multiplication).« less

  5. 77 FR 75649 - Establishment of Interim Final Supplementary Rules for Public Lands Managed by the Carrizo Plain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ..., airsoft, or war game apparatus) is prohibited on the Monument. The use of these types of weapons leaves... devices often are convincing reproductions that could be mistaken for real weapons by law enforcement... military, fire, emergency, or law enforcement vehicle being used for emergency purposes; The vehicle is...

  6. 77 FR 28790 - Medical Loss Ratio Requirements Under the Patient Protection and Affordable Care Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... information will be available on the HHS Web site, HealthCare.gov , providing an efficient method of public... Sources, Methods, and Limitations On December 1, 2010, we published an interim final rule (75 FR 74864... impacts of the MLR rule, the data contain certain limitations; we developed imputation methods to account...

  7. 75 FR 34537 - Interim Final Rules for Group Health Plans and Health Insurance Coverage Relating to Status as a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... 45 CFR Part 147 Group Health Plans and Health Insurance Coverage Relating to Status as a... for Group Health Plans and Health Insurance Coverage Relating to Status as a Grandfathered Health Plan... group health plans and health insurance coverage in the group and individual markets under provisions of...

  8. 76 FR 40457 - Administrative Simplification: Adoption of Operating Rules for Eligibility for a Health Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... Plan and Health Care Claim Status Transactions; Interim Final Rule #0;#0;Federal Register / Vol. 76, No... Simplification: Adoption of Operating Rules for Eligibility for a Health Plan and Health Care Claim Status... rules for the health care industry and directed the Secretary of Health and Human Services to ``adopt a...

  9. Hazardous Waste Management System: Identification and Listing of Hazardous Waste - CERCLA Hazardous Substance Designation-Petroleum Refinery Primary and Other Listings (F037 and F038) - Federal Register Notice, May 13, 1991

    EPA Pesticide Factsheets

    The Agency is promulgating an interim final rule revising the definition of wastes subject to the F037 and F038 listings to state that sludges from non-contact, once-through cooling waters are not included.

  10. 75 FR 41726 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Coverage of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... cessation, obesity, and other topics. Immunizations for routine use in children, adolescents, and adults... aspirin use, tobacco cessation, and obesity. 3. Estimated Number of Affected Entities For purposes of the... already chosen to cover these services. For example, most health plans cover most childhood and some adult...

  11. 76 FR 37037 - Requirements for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-24

    ... Requirements for Group Health Plans and Health Insurance Issuers Relating to Internal Claims and Appeals and... interim final regulations published July 23, 2010 with respect to group health plans and health insurance..., group health plans, and health insurance issuers providing group health insurance coverage. The text of...

  12. 75 FR 27141 - Group Health Plans and Health Insurance Issuers Providing Dependent Coverage of Children to Age...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... Group Health Plans and Health Insurance Issuers Providing Dependent Coverage of Children to Age 26 Under... Information and Insurance Oversight of the U.S. Department of Health and Human Services are issuing substantially similar interim final regulations with respect to group health plans and health insurance coverage...

  13. 75 FR 53353 - Notice of Availability of Final Interim Staff Guidance Document No. 25 “Pressure and Helium...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... Guidance Document No. 25 ``Pressure and Helium Leakage Testing of the Confinement Boundary of Spent Fuel...: The Division of Spent Fuel Storage and Transportation (SFST) of the Office of Nuclear Materials Safety... Helium Leakage Testing of the Confinement Boundary of Spent Fuel Dry Storage Systems.'' This ISG...

  14. 75 FR 81921 - Fisheries of the Exclusive Economic Zone Off Alaska; Steller Sea Lion Protection Measures for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    .... 101006495-0498-01] RIN 0648-BA31 Fisheries of the Exclusive Economic Zone Off Alaska; Steller Sea Lion Protection Measures for the Bering Sea and Aleutian Islands Groundfish Fisheries Off Alaska; Correction... interim final rule pertaining to Fisheries of the Exclusive Economic Zone Off Alaska; Steller Sea Lion...

  15. 75 FR 8526 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... regarding the interim final rule (IFR) procedures for the use of a new alcohol screening device (ASD) which... for an employer to utilize a specific ASD to conduct required DOT alcohol tests, the device must (a... model specifications, (b) be published by NHTSA in the Federal Register on their most current ASD CPL...

  16. 76 FR 16231 - Clarification of Countries and Geographic Areas Eligible for Participation in the Guam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... regulations to clarify that individuals holding British National (Overseas) (BN(O)) passports as a result of... days. This interim final rule provides that beginning May 23, 2011, individuals holding BN(O) passports...-CNMI Visa Waiver Program on such BN(O) passport must present it and a Hong Kong identification card...

  17. 78 FR 24047 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program, Part 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... Employment and Training Administration 20 CFR Part 655 RIN 1205-AB69 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program, Part 2 AGENCY: Employment and Training Administration, Labor; U.S. Citizenship and Immigration Services, DHS. ACTION: Interim final rule; request for comments. SUMMARY: The...

  18. 76 FR 35957 - Supplemental Standards of Ethical Conduct for Employees of the Court Services and Offender...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ...-0009-P] RIN 3209-AA15 and 3225-AA07 Supplemental Standards of Ethical Conduct for Employees of the... of the Office of Government Ethics (OGE), is adopting as final, without change, the interim CSOSA rule that supplements the executive-branch- wide Standards of Ethical Conduct (Standards) issued by OGE...

  19. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... circumstances and, in such cases, the State process must provide notice of the decision as expeditiously as... by the Secretary of Labor. Similarly, with respect to internal claims and appeals processes for... incorporate additional consumer protections so that the State process will continue to apply after the end of...

  20. 75 FR 5356 - Office of New Reactors; Final Interim Staff Guidance on Post-Combined License Commitments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... the guidance provided to the NRC staff in Section 1.0, ``Introduction and Interfaces,'' of NUREG-0800... (COL) applications. In addition, this ISG supplements the guidance provided in Section C.III.4 of... Accession No. ML091671355) to solicit public and industry comment. The NRC staff received comments (ADAMS...

  1. Harvard University Program on Technology and Society 1964-1972. A Final Review.

    ERIC Educational Resources Information Center

    Harvard Univ., Cambridge, MA. Program on Technology and Society.

    Eight years of research by the Harvard University's Program on Technology and Society are summarized. Lengthy abstracts of the 29 books and 164 articles that resulted from the Program, as well as interim accounts of projects not yet completed are presented. The report is divided into four parts; institutions (including business, education, and…

  2. Draft Final Risk Assessment Lime Settling Basins. Version 2.1

    DTIC Science & Technology

    1990-10-25

    TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0

  3. 76 FR 59574 - Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug Testing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... 2105-AE13 Procedures for Transportation Workplace Drug and Alcohol Testing Programs: Federal Drug...) published an interim final rule (IFR) authorizing the use of a new Federal Drug Testing Custody and Control Form (CCF) in its drug testing program. Use of the form is authorized beginning October 1, 2010. This...

  4. 75 FR 52857 - National Endowment for the Humanities Implementation of OMB Guidance on Drug-Free Workplace...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... the Governmentwide common rule on drug-free workplace requirements for financial assistance, currently.... Federal agencies issued an interim final common rule to implement the act as it applied to grants [54 FR 4946, January 31, 1989]. The rule was a subpart of the Governmentwide common rule on nonprocurement...

  5. 75 FR 39133 - Institute of Museum and Library Services Implementation of OMB Guidance on Drug-Free Workplace...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... regulation implementing the Governmentwide common rule on drug-free workplace requirements for financial... interim final common rule to implement the act as it applied to grants [54 FR 4946, January 31, 1989]. The rule was a subpart of the Governmentwide common rule on nonprocurement suspension and debarment. The...

  6. 77 FR 15555 - Freedom of Information Act and Privacy Act Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... to apply a presumption of disclosure in FOIA decision making. This Interim Final Rule parallels the... making the request will be informed within 10 days of the expected date for a decision. The decision upon... Appellate Authority will inform the person making the request in writing of the decision on the request for...

  7. 76 FR 67385 - Claims Procedures Under the Oil Pollution Act of 1990

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ...-AA03 Claims Procedures Under the Oil Pollution Act of 1990 AGENCY: Coast Guard, DHS. ACTION: Notice of... finalize a 1992 interim rule that set forth the Oil Pollution Act of 1990 (OPA'90) claims procedures and... Pollution Funds Center, U.S. Coast Guard, telephone (202) 493-6863, email [email protected] . If you...

  8. 75 FR 36506 - Final Rule Regarding Amendment of the Temporary Liquidity Guarantee Program To Extend the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... percent or more of their assets. II. Interim Rule While the immediate financial crisis that led to the... facing community banks have intensified as the lingering consequences of the 2008 financial crisis and... financial crisis and recession are expected to persist for some time, especially as the magnitude of...

  9. 78 FR 37667 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-67; Introduction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    ...-010 Morgan. Women-owned Small Business Concerns (Interim). VIII Deletion of Report 2013-008 Davis. to... Contracting Integrity, an internal DoD panel, consists of senior-level DoD officials from across DoD working... contractor performance. This final rule is not required to be published for public comment because it only...

  10. 78 FR 25487 - Final License Renewal Interim Staff Guidance LR-ISG-2012-01: Wall Thinning Due to Erosion Mechanisms

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ....'' This LR-ISG revises an NRC staff-recommended aging management program (AMP) in NUREG-1801, Revision 2, ``Generic Aging Lessons Learned (GALL) Report,'' and the NRC staff's aging management review procedure and... for piping and components within the scope of the Requirements for Renewal of Operating Licenses for...

  11. 76 FR 31979 - Notice of Interim Final Supplementary Rules for Public Lands Managed by the Ukiah Field Office in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... parts, soil, rocks, minerals, or cave resources within the following ACECs: Lost Valley--40 acres (Cow... Creek, Cow Mountain, Knoxville, Geysers, Indian Valley, Black Forest, the Cedars of Sonoma County and... hour after sunset except for long-term parking for overnight backcountry visitors. Cow Mountain...

  12. 75 FR 34923 - General Schedule Locality Pay Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ...;Prices of new books are listed in the first FEDERAL REGISTER issue of each #0;week. #0; #0; #0; #0;#0... area to the New York locality pay area. We received no comments on the interim rule and adopt the final... Philadelphia locality pay area while Lakehurst, in Ocean County, New Jersey, was in the New York locality pay...

  13. 78 FR 57257 - Medicare Determinations and Income-Related Monthly Adjustment Amounts to Medicare Part B Premiums...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...; Conforming Changes to Regulations AGENCY: Social Security Administration. ACTION: Interim final rule with... monthly adjustment amounts (IRMAA) in order to conform to changes made to the Social Security Act (Act) by... SOCIAL SECURITY ADMINISTRATION 20 CFR Parts 404 and 418 [Docket No. SSA-2012-0011] RIN 0960-AH47...

  14. 77 FR 56739 - Federal Acquisition Regulation; United States-Korea Free Trade Agreement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ...DoD, GSA, and NASA are adopting as final, without change, an interim rule amending the Federal Acquisition Regulation (FAR) to implement the United States-Korea Free Trade Agreement. The Republic of Korea is already party to the World Trade Organization Government Procurement Agreement, but this trade agreement implements a lower procurement threshold.

  15. Henry Taube and Coordination Chemistry

    Science.gov Websites

    Shifts Caused by Cr++ in Aqueous Solutions, DOE Technical Report, 1962 Reactions of Solvated Ions Final Report, DOE Technical Report, 1962 Isotopic Discrimination of Some Solutes in Liquid Ammonia, DOE Technical Report, 1966 Final Technical Report of Research, DOE Technical Report, 1972 Top Additional Web

  16. George A. Olah, Carbocation and Hydrocarbon Chemistry

    Science.gov Websites

    . Final Technical Report. [HF:BF{sub 2}/H{sub 2}] , DOE Technical Report, 1980 Superacid Catalyzed Coal Conversion Chemistry. 1st and 2nd Quarterly Technical Progress Reports, September 1, 1983-March 30, 1984 , DOE Technical Report, 1984 Superacid Catalyzed Coal Conversion Chemistry. Final Technical Report

  17. A two-stage patient enrichment adaptive design in phase II oncology trials.

    PubMed

    Song, James X

    2014-01-01

    Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.

  18. 77 FR 46306 - Fluxapyroxad; Pesticide Tolerances Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ...; Pesticide Tolerances Technical Amendment AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule; technical amendment. SUMMARY: EPA issued a final rule in the Federal Register of May 14, 2012, concerning.... Inadvertently, the terminology for the oilseed crop group and for dried plums was incorrect. This technical...

  19. Medicare program; coverage and payment of ambulance services; inflation update for CY 2004. Final rule with comment period.

    PubMed

    2003-12-05

    This final rule provides the sunset date for the interim bonus payment for rural ambulance mileage of 18 through 50 miles as required by the Medicare, Medicaid and State Child Health Insurance Program Benefits Improvement and Protection Act of 2000 (BIPA) and provides notice of the annual Ambulance Inflation Factor (AIF) for ambulance services for calendar year (CY) 2004. The statute requires that this inflation factor be applied in determining the fee schedule amounts and payment limits for ambulance services.

  20. Maumee Bay State Park, Ohio. Shoreline Erosion Beach Restoration Study. Final Feasibility Report and Final Environmental Impact Statement. Interim to Western Lake Erie Shore Study. Volume 2. Appendices. Revised.

    DTIC Science & Technology

    1983-12-01

    The vegetation is typified by a variety of vines and shrubs , including dogwood, sumac, wild plum, honeysuckle, wild grape, blackberry, honey locust...demand analysis. The SCORP studies for Ohio, Indiana , and Michigan were reviewed since most of *the Maumee Bay visitation was expected to originate...Bay State Park by State, by Zone :Distance: Zone:In Miles: Ohio Michigan : Indiana :Pennsylvania: Canada 1 : 0-25 :Lucas :Monroe :None :None :None

  1. Radioactive Wastes.

    PubMed

    Choudri, B S; Charabi, Yassine; Baawain, Mahad; Ahmed, Mushtaque

    2017-10-01

    Papers reviewed herein present a general overview of radioactive waste related activities around the world in 2016. The current reveiw include studies related to safety assessments, decommission and decontamination of nuclear facilities, fusion facilities, transportation. Further, the review highlights on management solutions for the final disposal of low and high level radioactive wastes (LLW and HLW), interim storage and final disposal options for spent fuel (SF), and tritiated wastes, with a focus on environmental impacts due to the mobility of radionuclides in ecosystem, water and soil alongwith other progress made in the management of radioactive wastes.

  2. Schedules of Controlled Substances: Table of Excluded Nonnarcotic Products: Vicks® VapoInhaler®.

    PubMed

    2016-02-08

    This final rule adopts the interim final rule, with a correction to spelling of the manufacturer's name that was published in the Federal Register on October 27, 2015. The Drug Enforcement Administration is amending the table of Excluded Nonnarcotic Products to update the listing for Vicks® VapoInhaler®, containing 50 mg levmetamfetamine in a nasal decongestant inhaler, marketed by The Procter & Gamble Company. This over-the-counter, non-narcotic drug product is excluded from provisions of the Controlled Substances Act.

  3. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  4. Near-surface wind variability over the broader Adriatic region: insights from an ensemble of regional climate models

    NASA Astrophysics Data System (ADS)

    Belušić, Andreina; Prtenjak, Maja Telišman; Güttler, Ivan; Ban, Nikolina; Leutwyler, David; Schär, Christoph

    2018-06-01

    Over the past few decades the horizontal resolution of regional climate models (RCMs) has steadily increased, leading to a better representation of small-scale topographic features and more details in simulating dynamical aspects, especially in coastal regions and over complex terrain. Due to its complex terrain, the broader Adriatic region represents a major challenge to state-of-the-art RCMs in simulating local wind systems realistically. The objective of this study is to identify the added value in near-surface wind due to the refined grid spacing of RCMs. For this purpose, we use a multi-model ensemble composed of CORDEX regional climate simulations at 0.11° and 0.44° grid spacing, forced by the ERA-Interim reanalysis, a COSMO convection-parameterizing simulation at 0.11° and a COSMO convection-resolving simulation at 0.02° grid spacing. Surface station observations from this region and satellite QuikSCAT data over the Adriatic Sea have been compared against daily output obtained from the available simulations. Both day-to-day wind and its frequency distribution are examined. The results indicate that the 0.44° RCMs rarely outperform ERA-Interim reanalysis, while the performance of the high-resolution simulations surpasses that of ERA-Interim. We also disclose that refining the grid spacing to a few km is needed to properly capture the small-scale wind systems. Finally, we show that the simulations frequently yield the accurate angle of local wind regimes, such as for the Bora flow, but overestimate the associated wind magnitude. Finally, spectral analysis shows good agreement between measurements and simulations, indicating the correct temporal variability of the wind speed.

  5. Use of Interim Scaffolding and Neotissue Development to Produce a Scaffold-Free Living Hyaline Cartilage Graft.

    PubMed

    Lau, Ting Ting; Leong, Wenyan; Peck, Yvonne; Su, Kai; Wang, Dong-An

    2015-01-01

    The fabrication of three-dimensional (3D) constructs relies heavily on the use of biomaterial-based scaffolds. These are required as mechanical supports as well as to translate two-dimensional cultures to 3D cultures for clinical applications. Regardless of the choice of scaffold, timely degradation of scaffolds is difficult to achieve and undegraded scaffold material can lead to interference in further tissue development or morphogenesis. In cartilage tissue engineering, hydrogel is the highly preferred scaffold material as it shares many similar characteristics with native cartilaginous matrix. Hence, we employed gelatin microspheres as porogens to create a microcavitary alginate hydrogel as an interim scaffold to facilitate initial chondrocyte 3D culture and to establish a final scaffold-free living hyaline cartilaginous graft (LhCG) for cartilage tissue engineering.

  6. Modeling Clinical Outcomes in Prostate Cancer: Application and Validation of the Discrete Event Simulation Approach.

    PubMed

    Pan, Feng; Reifsnider, Odette; Zheng, Ying; Proskorovsky, Irina; Li, Tracy; He, Jianming; Sorensen, Sonja V

    2018-04-01

    Treatment landscape in prostate cancer has changed dramatically with the emergence of new medicines in the past few years. The traditional survival partition model (SPM) cannot accurately predict long-term clinical outcomes because it is limited by its ability to capture the key consequences associated with this changing treatment paradigm. The objective of this study was to introduce and validate a discrete-event simulation (DES) model for prostate cancer. A DES model was developed to simulate overall survival (OS) and other clinical outcomes based on patient characteristics, treatment received, and disease progression history. We tested and validated this model with clinical trial data from the abiraterone acetate phase III trial (COU-AA-302). The model was constructed with interim data (55% death) and validated with the final data (96% death). Predicted OS values were also compared with those from the SPM. The DES model's predicted time to chemotherapy and OS are highly consistent with the final observed data. The model accurately predicts the OS hazard ratio from the final data cut (predicted: 0.74; 95% confidence interval [CI] 0.64-0.85 and final actual: 0.74; 95% CI 0.6-0.88). The log-rank test to compare the observed and predicted OS curves indicated no statistically significant difference between observed and predicted curves. However, the predictions from the SPM based on interim data deviated significantly from the final data. Our study showed that a DES model with properly developed risk equations presents considerable improvements to the more traditional SPM in flexibility and predictive accuracy of long-term outcomes. Copyright © 2018 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  7. 75 FR 2557 - Interim Policy for the Sharing of Information Collected by the Coast Guard Nationwide Automatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... (real-time) information collected by the NAIS that is less than 12 hours from transmission. Level B... specific questions on the development of the NAIS final policy: 1. How might providing real-time, near real... collected by the NAIS considered sensitive? a. Is real-time or near real-time information collected by the...

  8. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  9. 30 CFR 250.911 - If my platform is subject to the Platform Verification Program, what must I do?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a project management timeline, Gantt Chart, that depicts when interim and final reports required by... 30 Mineral Resources 2 2010-07-01 2010-07-01 false If my platform is subject to the Platform Verification Program, what must I do? 250.911 Section 250.911 Mineral Resources MINERALS MANAGEMENT SERVICE...

  10. Interim Reflections on the Corporate University and SME Academy Business Development Innovation and Its Diffusion

    ERIC Educational Resources Information Center

    Dealtry, Richard

    2008-01-01

    Purpose: The purpose of this paper is to reflect on and inform about learning points from ECUANET, a two-year duration best practice action research and transnational networking project as it approaches its final stage. Design/methodology/approach: The paper explicates the key positive and obfuscating dynamics that the project team have had to,…

  11. 78 FR 62430 - Department of Defense (DoD)-Defense Industrial Base (DIB) Voluntary Cyber Security and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... National Defense Authorization Act for Fiscal Year 2013. Comments DoD published an interim final rule on May 11, 2012 (77 FR 27615). Fifty comments from twelve respondents were received and reviewed by the... year. Public Law 96-354, ``Regulatory Flexibility Act'' (5 U.S.C. 601) It has been certified that 32...

  12. 75 FR 36438 - Notice of Interim Final Supplementary Rules for Public Lands Managed by the California Desert...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-25

    ... purposes. Such sites or areas may include such features as: Delineated spaces for parking, camping or boat.../or construction debris. 4. Possession of glass beverage containers is prohibited in all developed... or save a camping space for another person at all developed sites and areas and all ORV open areas. 8...

  13. 78 FR 59791 - Annual Company-Run Stress Tests at Banking Organizations With Total Consolidated Assets of More...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... Stress Tests at Banking Organizations With Total Consolidated Assets of More Than $10 Billion But Less... Stress Test Cycle AGENCY: Board of Governors of the Federal Reserve System (Board). ACTION: Interim final... framework) in their stress tests for the stress test cycle that begins October 1, 2013. For this stress test...

  14. Evaluation Design 1978-1979: ESAA Title I Migrant Program. Publication Number 78.11.

    ERIC Educational Resources Information Center

    Friedman, Myron; And Others

    To collect and disseminate information relevant to the accountability and program components of the Title I Migrant Program in the Austin school district and to report to the Texas Education Agency through interim and final reports on how well the migrant program is meeting its stated objectives for 1978-79 are the functions of the evaluation for…

  15. 78 FR 53643 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Delay of Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... connection with a temporary labor certification for use in petitioning the Department of Homeland Security to... not affect the Interim Final Rule, 78 FR 24047, published on April 24, 2013, establishing the current... States (U.S.) workers recruited in connection with a temporary labor certification for use in petitioning...

  16. 75 FR 53153 - Federal Acquisition Regulation; American Recovery and Reinvestment Act of 2009 (the Recovery Act...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ...The Civilian Agency Acquisition Council and the Defense Acquisition Regulations Council (the Councils) have adopted as final, with changes, an interim rule amending the Federal Acquisition Regulation (FAR) to implement the American Recovery and Reinvestment Act of 2009 (Recovery Act) with respect to the ``Buy American--Recovery Act'' provision, section 1605 in Division A.

  17. Middle School Mathematics Professional Development Impact Study: Findings after the Second Year of Implementation. NCEE 2011-4024

    ERIC Educational Resources Information Center

    Garet, Michael S.; Wayne, Andrew J.; Stancavage, Fran; Taylor, James; Eaton, Marian; Walters, Kirk; Song, Mengli; Brown, Seth; Hurlburt, Steven; Zhu, Pei; Sepanik, Susan; Doolittle, Fred

    2011-01-01

    This is the second and final report of the Middle School Mathematics Professional Development Impact Study, which examines the impact of providing a professional development (PD) program in rational number topics to seventh-grade mathematics teachers. An interim report (Garet et al. 2010) described the findings after one year of PD. The current…

  18. ASSESSMENT OF THE IMPACTS OF GLOBAL CHANGE ON REGIONAL U.S. AIR QUALITY: A SYNTHESIS OF CLIMATE CHANGE IMPACTS ON GROUND-LEVEL OZONE (AN INTERIM REPORT OF THE U.S. EPA GLOBAL CHANGE RESEARCH PROGRAM)

    EPA Science Inventory

    The Air Quality Assessment Final Report is intended for managers and scientists working on air quality to provide them with information on the potential effects of climate change on regional air quality in the United States.

  19. 75 FR 15664 - Serve America Act Amendments to the National and Community Service Act of 1990 and the Domestic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... illustrate the limitation on the value of education awards an individual may receive, the preamble stated that a person who had previously earned the aggregate value of 1.71 awards could enroll in a quarter... interim final rule by revising the preamble language providing an example of the aggregate value of...

  20. 75 FR 78928 - Limited Service Domestic Voyage Load Lines for River Barges on Lake Michigan, Delay of Effective...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-17

    ... Advisories may also be issued when lake ice exists that could be hazardous to small boats. Although river...-AA17 Limited Service Domestic Voyage Load Lines for River Barges on Lake Michigan, Delay of Effective... Lake Michigan. This rule finalized interim regulations that have been in effect since 2002, with some...

Top